Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-05
...: 3060-0329. Title: Section 2.955, Equipment Authorization-Verification (Retention of Records). Form No.... Section 2.955 describes for each equipment device subject to verification, the responsible party, as shown... performing the verification testing. The Commission may request additional information regarding the test...
Space transportation system payload interface verification
NASA Technical Reports Server (NTRS)
Everline, R. T.
1977-01-01
The paper considers STS payload-interface verification requirements and the capability provided by STS to support verification. The intent is to standardize as many interfaces as possible, not only through the design, development, test and evaluation (DDT and E) phase of the major payload carriers but also into the operational phase. The verification process is discussed in terms of its various elements, such as the Space Shuttle DDT and E (including the orbital flight test program) and the major payload carriers DDT and E (including the first flights). Five tools derived from the Space Shuttle DDT and E are available to support the verification process: mathematical (structural and thermal) models, the Shuttle Avionics Integration Laboratory, the Shuttle Manipulator Development Facility, and interface-verification equipment (cargo-integration test equipment).
The overall objective of the Environmental Testing and Verification Coatings and Coating Equipment Program is to verify pollution prevention and performance characteristics of coating technologies and make the results of the testing available to prospective coating technology use...
This document is the Environmental Technology Verification (ETV) Technology Specific Test Plan (TSTP) for evaluation of drinking water treatment equipment utilizing adsorptive media for synthetic organic chemical (SOC) removal. This TSTP is to be used within the structure provid...
40 CFR 1065.920 - PEMS Calibrations and verifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... verification. The verification consists of operating an engine over a duty cycle in the laboratory and... by laboratory equipment as follows: (1) Mount an engine on a dynamometer for laboratory testing...
NASA Technical Reports Server (NTRS)
1986-01-01
Activities that will be conducted in support of the development and verification of the Block 2 Solid Rocket Motor (SRM) are described. Development includes design, fabrication, processing, and testing activities in which the results are fed back into the project. Verification includes analytical and test activities which demonstrate SRM component/subassembly/assembly capability to perform its intended function. The management organization responsible for formulating and implementing the verification program is introduced. It also identifies the controls which will monitor and track the verification program. Integral with the design and certification of the SRM are other pieces of equipment used in transportation, handling, and testing which influence the reliability and maintainability of the SRM configuration. The certification of this equipment is also discussed.
This report is a generic verification protocol by which EPA’s Environmental Technology Verification program tests newly developed equipment for distributed generation of electric power, usually micro-turbine generators and internal combustion engine generators. The protocol will ...
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
40 CFR 1065.920 - PEMS calibrations and verifications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement Systems § 1065... that your new configuration meets this verification. The verification consists of operating an engine... with data simultaneously generated and recorded by laboratory equipment as follows: (1) Mount an engine...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-01-12
This report describes the work done under Phase II, the verification testing of the Kinetic Extruder. The main objective of the test program was to determine failure modes and wear rates. Only minor auxiliary equipment malfunctions were encountered. Wear rates indicate useful life expectancy of from 1 to 5 years for wear-exposed components. Recommendations are made for adapting the equipment for pilot plant and commercial applications. 3 references, 20 figures, 12 tables.
Applying Independent Verification and Validation to Automatic Test Equipment
NASA Technical Reports Server (NTRS)
Calhoun, Cynthia C.
1997-01-01
This paper describes a general overview of applying Independent Verification and Validation (IV&V) to Automatic Test Equipment (ATE). The overview is not inclusive of all IV&V activities that can occur or of all development and maintenance items that can be validated and verified, during the IV&V process. A sampling of possible IV&V activities that can occur within each phase of the ATE life cycle are described.
NASA Astrophysics Data System (ADS)
Badini, L.; Grassi, F.; Pignari, S. A.; Spadacini, G.; Bisognin, P.; Pelissou, P.; Marra, S.
2016-05-01
This work presents a theoretical rationale for the substitution of radiated-susceptibility (RS) verifications defined in current aerospace standards with an equivalent conducted-susceptibility (CS) test procedure based on bulk current injection (BCI) up to 500 MHz. Statistics is used to overcome the lack of knowledge about uncontrolled or uncertain setup parameters, with particular reference to the common-mode impedance of equipment. The BCI test level is properly investigated so to ensure correlation of currents injected in the equipment under test via CS and RS. In particular, an over-testing probability quantifies the severity of the BCI test with respect to the RS test.
Test/QA Plan for Verification of Nitrate Sensors for Groundwater Remediation Monitoring
A submersible nitrate sensor is capable of collecting in-situ measurements of dissolved nitrate concentrations in groundwater. Although several types of nitrate sensors currently exist, this verification test will focus on submersible sensors equipped with a nitrate-specific ion...
47 CFR 25.132 - Verification of earth station antenna performance standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Verification of earth station antenna... Verification of earth station antenna performance standards. (a)(1) Except for applications for 20/30 GHz earth... the antenna manufacturer on representative equipment in representative configurations, and the test...
NASA Technical Reports Server (NTRS)
1979-01-01
Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.
This report presents the results of the verification test of the Sharpe Platinum 2013 high-volume, low-pressure gravity-feed spray gun, hereafter referred to as the Sharpe Platinum, which is designed for use in automotive refinishing. The test coating chosen by Sharpe Manufacturi...
Code of Federal Regulations, 2010 CFR
2010-07-01
... laboratory equipment calibrations and verifications as prescribed by subpart B of this part or by good... in-use confirmatory testing; submittal of information and maintenance of records. 86.1847-01 Section... confirmatory testing; submittal of information and maintenance of records. (a) The manufacturer who conducts or...
Biomedical support systems. [use and verification of biomedical hardware in altitude test
NASA Technical Reports Server (NTRS)
Brockett, R. M.; Ferguson, J. M.; Luczkowski, S. M.
1973-01-01
Biomedical support hardware for SMEAT consisted basically of two systems, the inflight medical support system, and the operational bioinstrumentation system. The former is essentially a diagnostic and therapeutic kit; the latter is a belt equipped with sensors worn by the crewman to permit monitoring of his vital signs. Special attention was given during to the use and verification of the items in the systems so that changes required in the equipment could be pinpointed and effected prior to the Skylab mission. During the in-chamber testing, evaluations were made of the effectiveness of the proposed microbiology procedures, techniques, equipment, and the stability of media and reagents over the extended period of storage.
JWST Telescope Integration and Test Progress
NASA Technical Reports Server (NTRS)
Matthews, Gary W.; Whitman, Tony L.; Feinberg, Lee D.; Voyton, Mark F.; Lander, Juli A.; Keski-Kuha, Ritva
2016-01-01
The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.
Equipment testing and verification of PCI Membrane Systems Inc. Fyne Process nanofiltraton systems Model ROP 1434 equipped with a C10 module containing AFC-30 tubular membranes was conducted from 3/16-5/11/2000 in Barrow, AS. The source water was a moderate alkalinity, moderately...
Commander Lousma works with EEVT experiment and cryogenic tube on aft middeck
1982-03-31
Commander Jack Lousma works with Electrophoresis Equipment Verification Test (EEVT) electrophoresis unit, cryogenic freezer and tube, and stowage locker equipment located on crew compartment middeck aft bulkhead.
40 CFR 1066.130 - Measurement instrument calibrations and verifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Measurement instrument calibrations... (CONTINUED) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Equipment, Measurement Instruments, Fuel, and Analytical Gas Specifications § 1066.130 Measurement instrument calibrations and verifications. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, Phillip A.; O'Hagan, Ryan; Shumaker, Brent
The Advanced Test Reactor (ATR) has always had a comprehensive procedure to verify the performance of its critical transmitters and sensors, including RTDs, and pressure, level, and flow transmitters. These transmitters and sensors have been periodically tested for response time and calibration verification to ensure accuracy. With implementation of online monitoring techniques at ATR, the calibration verification and response time testing of these transmitters and sensors are verified remotely, automatically, hands off, include more portions of the system, and can be performed at almost any time during process operations. The work was done under a DOE funded SBIR project carriedmore » out by AMS. As a result, ATR is now able to save the manpower that has been spent over the years on manual calibration verification and response time testing of its temperature and pressure sensors and refocus those resources towards more equipment reliability needs. More importantly, implementation of OLM will help enhance the overall availability, safety, and efficiency. Together with equipment reliability programs of ATR, the integration of OLM will also help with I&C aging management goals of the Department of Energy and long-time operation of ATR.« less
This report presents the results of the verification test of the DeVilbiss GTi-600G high-volume, low-pressure gravity-feed spray gun, hereafter referred to as the DeVilbiss GTi, which is designed for use in automotive refinishing. The test coating chosen by ITW Automotive Refinis...
This report presents the results of the verification test of the DeVilbiss FLG-631-318 high-volume, low-pressure gravity-feed spray gun, hereafter referred to as the DeVilbiss FLG, which is designed for use in automotive refinishing. The test coating chosen by ITW Automotive Refi...
NASA Astrophysics Data System (ADS)
Akers, James C.; Passe, Paul J.; Cooper, Beth A.
2005-09-01
The Acoustical Testing Laboratory (ATL) at the NASA John H. Glenn Research Center (GRC) in Cleveland, OH, provides acoustic emission testing and noise control engineering services for a variety of specialized customers, particularly developers of equipment and science experiments manifested for NASA's manned space missions. The ATL's primary customer has been the Fluids and Combustion Facility (FCF), a multirack microgravity research facility being developed at GRC for the USA Laboratory Module of the International Space Station (ISS). Since opening in September 2000, ATL has conducted acoustic emission testing of components, subassemblies, and partially populated FCF engineering model racks. The culmination of this effort has been the acoustic emission verification tests on the FCF Combustion Integrated Rack (CIR) and Fluids Integrated Rack (FIR), employing a procedure that incorporates ISO 11201 (``Acoustics-Noise emitted by machinery and equipment-Measurement of emission sound pressure levels at a work station and at other specified positions-Engineering method in an essentially free field over a reflecting plane''). This paper will provide an overview of the test methodology, software, and hardware developed to perform the acoustic emission verification tests on the CIR and FIR flight racks and lessons learned from these tests.
Communication Satellite Payload Special Check out Equipment (SCOE) for Satellite Testing
NASA Astrophysics Data System (ADS)
Subhani, Noman
2016-07-01
This paper presents Payload Special Check out Equipment (SCOE) for the test and measurement of communication satellite Payload at subsystem and system level. The main emphasis of this paper is to demonstrate the principle test equipment, instruments and the payload test matrix for an automatic test control. Electrical Ground Support Equipment (EGSE)/ Special Check out Equipment (SCOE) requirements, functions and architecture for C-band and Ku-band payloads are presented in details along with their interface with satellite during different phases of satellite testing. It provides test setup, in a single rack cabinet that can easily be moved from payload assembly and integration environment to thermal vacuum chamber all the way to launch site (for pre-launch test and verification).
Airside HVAC BESTEST: HVAC Air-Distribution System Model Test Cases for ASHRAE Standard 140
DOE Office of Scientific and Technical Information (OSTI.GOV)
Judkoff, Ronald; Neymark, Joel; Kennedy, Mike D.
This paper summarizes recent work to develop new airside HVAC equipment model analytical verification test cases for ANSI/ASHRAE Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. The analytical verification test method allows comparison of simulation results from a wide variety of building energy simulation programs with quasi-analytical solutions, further described below. Standard 140 is widely cited for evaluating software for use with performance-path energy efficiency analysis, in conjunction with well-known energy-efficiency standards including ASHRAE Standard 90.1, the International Energy Conservation Code, and other international standards. Airside HVAC Equipment is a common area ofmore » modelling not previously explicitly tested by Standard 140. Integration of the completed test suite into Standard 140 is in progress.« less
Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1996-04-19
This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area Treated Effluent Disposal Facility control system, is also performed.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (j) Fire-detecting and fire-extinguishing equipment. (k) Pollution-prevention equipment. (l) Sanitary condition. (m) Fire hazards. (n) Verification of validity of certificates required and issued by the Federal Communications Commission. (o) Lights and signals as required by the applicable navigational rules. (p) Tests and...
DOT National Transportation Integrated Search
1998-03-01
This report presents the development and verification of a testing protocol and protocol equipment for confined extension testing and confined creep testing for geosynthetic reinforcement materials. The developed data indicate that confined response ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neymark, J.; Kennedy, M.; Judkoff, R.
This report documents a set of diagnostic analytical verification cases for testing the ability of whole building simulation software to model the air distribution side of typical heating, ventilating and air conditioning (HVAC) equipment. These cases complement the unitary equipment cases included in American National Standards Institute (ANSI)/American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs, which test the ability to model the heat-transfer fluid side of HVAC equipment.
Baseline and Verification Tests of the Electric Vehicle Associates’ Current Fare Station Wagon.
1983-01-01
ELECTRIC Final Test Report VEICLE ASSOCIATES’CURRENT FARE STATION WAGON 27 March 1980 -6 November 1981 6. PERFORMING ORG. REPORT NUMBER * .7. AUTNOR(s) a...Whe,% Doe. Er(,rrrd) -I PREFACE Z..1~ The electric and hybrid vehicle test was conducted by the U.S. Army Mobility Equipment Research and Development...COAST-DOWN D. ELECTRIC AND HYBRID VEHICLE 92 VERIFICATION PROCEDURES 1".f S. -..°.o. . *-.. .,". .. " . ,. . . . . . . % % %d° ILLUSTRATIONS Figure
Study of techniques for redundancy verification without disrupting systems, phases 1-3
NASA Technical Reports Server (NTRS)
1970-01-01
The problem of verifying the operational integrity of redundant equipment and the impact of a requirement for verification on such equipment are considered. Redundant circuits are examined and the characteristics which determine adaptability to verification are identified. Mutually exclusive and exhaustive categories for verification approaches are established. The range of applicability of these techniques is defined in terms of signal characteristics and redundancy features. Verification approaches are discussed and a methodology for the design of redundancy verification is developed. A case study is presented which involves the design of a verification system for a hypothetical communications system. Design criteria for redundant equipment are presented. Recommendations for the development of technological areas pertinent to the goal of increased verification capabilities are given.
Strategies for Validation Testing of Ground Systems
NASA Technical Reports Server (NTRS)
Annis, Tammy; Sowards, Stephanie
2009-01-01
In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)
Software Verification of Orion Cockpit Displays
NASA Technical Reports Server (NTRS)
Biswas, M. A. Rafe; Garcia, Samuel; Prado, Matthew; Hossain, Sadad; Souris, Matthew; Morin, Lee
2017-01-01
NASA's latest spacecraft Orion is in the development process of taking humans deeper into space. Orion is equipped with three main displays to monitor and control the spacecraft. To ensure the software behind the glass displays operates without faults, rigorous testing is needed. To conduct such testing, the Rapid Prototyping Lab at NASA's Johnson Space Center along with the University of Texas at Tyler employed a software verification tool, EggPlant Functional by TestPlant. It is an image based test automation tool that allows users to create scripts to verify the functionality within a program. A set of edge key framework and Common EggPlant Functions were developed to enable creation of scripts in an efficient fashion. This framework standardized the way to code and to simulate user inputs in the verification process. Moreover, the Common EggPlant Functions can be used repeatedly in verification of different displays.
Software verification plan for GCS. [guidance and control software
NASA Technical Reports Server (NTRS)
Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.
1990-01-01
This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing for Automatic Auxiliary Boilers § 61.35-1 General. (a) All automatic... equipment must be tested and inspected to verify their proper design, construction, installation, and...
Array automated assembly task, phase 2. Low cost silicon solar array project
NASA Technical Reports Server (NTRS)
Rhee, S. S.; Jones, G. T.; Allison, K. T.
1978-01-01
Several modifications instituted in the wafer surface preparation process served to significantly reduce the process cost to 1.55 cents per peak watt in 1975 cents. Performance verification tests of a laser scanning system showed a limited capability to detect hidden cracks or defects, but with potential equipment modifications this cost effective system could be rendered suitable for applications. Installation of electroless nickel plating system was completed along with an optimization of the wafer plating process. The solder coating and flux removal process verification test was completed. An optimum temperature range of 500-550 C was found to produce uniform solder coating with the restriction that a modified dipping procedure is utilized. Finally, the construction of the spray-on dopant equipment was completed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Czarnecki, R M
1987-05-01
Guidelines have been developed to evaluate the seismic adequacy of the anchorage of various classes of electrical and mechanical equipment in nuclear power plants covered by NRC Unresolved Safety Issue A-46. The guidelines consist of screening tables that give the seismic anchorage capacity as a function of key equipment and anchorage fasteners, inspection checklists for field verification of anchorage adequacy, and provisions for outliers that can be used to further investigate anchorages that cannot be verified in the field. The screening tables are based on an analysis of the anchorage forces developed by common equipment types and on strength criteriamore » to quantify the holding power of anchor bolts and welds. The strength criteria for expansion anchor bolts were developed by collecting and analyzing a large quantity of test data.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Czarnecki, R M
1987-05-01
Guidelines have been developed to evaluate the seismic adequacy of the anchorage of various classes of electrical and mechanical equipment in nuclear power plants covered by NRC Unresolved Safety Issue A-46. The guidelines consist of screening tables that give the seismic anchorage capacity as a function of key equipment and anchorage fasteners, inspection checklists for field verification of anchorage adequacy, and provisions for outliers that can be used to further investigate anchorages that cannot be verified in the field. The screening tables are based on an analysis of the anchorage forces developed by common equipment types and on strength criteriamore » to quantify the holding power of anchor bolts and welds. The strength criteria for expansion anchor bolts were developed by collecting and analyzing a large quantity of test data.« less
7 CFR 3300.61 - Testing and verification requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF... accordance with ATP, Annex 1, Appendix 1, paragraphs 1, 1(a), 2(a), 2(b), 2(c) and 3, and Appendix 2...
7 CFR 3300.61 - Testing and verification requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF... accordance with ATP, Annex 1, Appendix 1, paragraphs 1, 1(a), 2(a), 2(b), 2(c) and 3, and Appendix 2...
7 CFR 3300.61 - Testing and verification requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF... accordance with ATP, Annex 1, Appendix 1, paragraphs 1, 1(a), 2(a), 2(b), 2(c) and 3, and Appendix 2...
7 CFR 3300.61 - Testing and verification requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF... accordance with ATP, Annex 1, Appendix 1, paragraphs 1, 1(a), 2(a), 2(b), 2(c) and 3, and Appendix 2...
7 CFR 3300.61 - Testing and verification requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF... accordance with ATP, Annex 1, Appendix 1, paragraphs 1, 1(a), 2(a), 2(b), 2(c) and 3, and Appendix 2...
Corrigan, Damion K; Salton, Neale A; Preston, Chris; Piletsky, Sergey
2010-09-01
Cleaning verification is a scientific and economic problem for the pharmaceutical industry. A large amount of potential manufacturing time is lost to the process of cleaning verification. This involves the analysis of residues on spoiled manufacturing equipment, with high-performance liquid chromatography (HPLC) being the predominantly employed analytical technique. The aim of this study was to develop a portable cleaning verification system for nelarabine using surface enhanced Raman spectroscopy (SERS). SERS was conducted using a portable Raman spectrometer and a commercially available SERS substrate to develop a rapid and portable cleaning verification system for nelarabine. Samples of standard solutions and swab extracts were deposited onto the SERS active surfaces, allowed to dry and then subjected to spectroscopic analysis. Nelarabine was amenable to analysis by SERS and the necessary levels of sensitivity were achievable. It is possible to use this technology for a semi-quantitative limits test. Replicate precision, however, was poor due to the heterogeneous drying pattern of nelarabine on the SERS active surface. Understanding and improving the drying process in order to produce a consistent SERS signal for quantitative analysis is desirable. This work shows the potential application of SERS for cleaning verification analysis. SERS may not replace HPLC as the definitive analytical technique, but it could be used in conjunction with HPLC so that swabbing is only carried out once the portable SERS equipment has demonstrated that the manufacturing equipment is below the threshold contamination level.
40 CFR 92.504 - Right of entry and access.
Code of Federal Regulations, 2010 CFR
2010-07-01
... manufacturer's or remanufacturer's production line testing or auditing program or any procedure or activity... service accumulation, emission test cycles, and maintenance and verification of test equipment calibration... not limited to, clerical, copying, interpretation and translation services; the making available on an...
A Review of International Space Station Habitable Element Equipment Offgassing Characteristics
NASA Technical Reports Server (NTRS)
Perry, Jay L.
2010-01-01
Crewed spacecraft trace contaminant control employs both passive and active methods to achieve acceptable cabin atmospheric quality. Passive methods include carefully selecting materials of construction, employing clean manufacturing practices, and minimizing systems and payload operational impacts to the cabin environment. Materials selection and manufacturing processes constitute the first level of equipment offgassing control. An element-level equipment offgassing test provides preflight verification that passive controls have been successful. Offgassing test results from multiple International Space Station (ISS) habitable elements and cargo vehicles are summarized and implications for active contamination control equipment design are discussed
Design Authority in the Test Programme Definition: The Alenia Spazio Experience
NASA Astrophysics Data System (ADS)
Messidoro, P.; Sacchi, E.; Beruto, E.; Fleming, P.; Marucchi Chierro, P.-P.
2004-08-01
In addition, being the Verification and Test Programme a significant part of the spacecraft development life cycle in terms of cost and time, very often the subject of the mentioned discussion has the objective to optimize the verification campaign by possible deletion or limitation of some testing activities. The increased market pressure to reduce the project's schedule and cost is originating a dialecting process inside the project teams, involving program management and design authorities, in order to optimize the verification and testing programme. The paper introduces the Alenia Spazio experience in this context, coming from the real project life on different products and missions (science, TLC, EO, manned, transportation, military, commercial, recurrent and one-of-a-kind). Usually the applicable verification and testing standards (e.g. ECSS-E-10 part 2 "Verification" and ECSS-E-10 part 3 "Testing" [1]) are tailored to the specific project on the basis of its peculiar mission constraints. The Model Philosophy and the associated verification and test programme are defined following an iterative process which suitably combines several aspects (including for examples test requirements and facilities) as shown in Fig. 1 (from ECSS-E-10). The considered cases are mainly oriented to the thermal and mechanical verification, where the benefits of possible test programme optimizations are more significant. Considering the thermal qualification and acceptance testing (i.e. Thermal Balance and Thermal Vacuum) the lessons learned originated by the development of several satellites are presented together with the corresponding recommended approaches. In particular the cases are indicated in which a proper Thermal Balance Test is mandatory and others, in presence of more recurrent design, where a qualification by analysis could be envisaged. The importance of a proper Thermal Vacuum exposure for workmanship verification is also highlighted. Similar considerations are summarized for the mechanical testing with particular emphasis on the importance of Modal Survey, Static and Sine Vibration Tests in the qualification stage in combination with the effectiveness of Vibro-Acoustic Test in acceptance. The apparent relative importance of the Sine Vibration Test for workmanship verification in specific circumstances is also highlighted. Fig. 1. Model philosophy, Verification and Test Programme definition The verification of the project requirements is planned through a combination of suitable verification methods (in particular Analysis and Test) at the different verification levels (from System down to Equipment), in the proper verification stages (e.g. in Qualification and Acceptance).
Projected Impact of Compositional Verification on Current and Future Aviation Safety Risk
NASA Technical Reports Server (NTRS)
Reveley, Mary S.; Withrow, Colleen A.; Leone, Karen M.; Jones, Sharon M.
2014-01-01
The projected impact of compositional verification research conducted by the National Aeronautic and Space Administration System-Wide Safety and Assurance Technologies on aviation safety risk was assessed. Software and compositional verification was described. Traditional verification techniques have two major problems: testing at the prototype stage where error discovery can be quite costly and the inability to test for all potential interactions leaving some errors undetected until used by the end user. Increasingly complex and nondeterministic aviation systems are becoming too large for these tools to check and verify. Compositional verification is a "divide and conquer" solution to addressing increasingly larger and more complex systems. A review of compositional verification research being conducted by academia, industry, and Government agencies is provided. Forty-four aviation safety risks in the Biennial NextGen Safety Issues Survey were identified that could be impacted by compositional verification and grouped into five categories: automation design; system complexity; software, flight control, or equipment failure or malfunction; new technology or operations; and verification and validation. One capability, 1 research action, 5 operational improvements, and 13 enablers within the Federal Aviation Administration Joint Planning and Development Office Integrated Work Plan that could be addressed by compositional verification were identified.
Design and Realization of Controllable Ultrasonic Fault Detector Automatic Verification System
NASA Astrophysics Data System (ADS)
Sun, Jing-Feng; Liu, Hui-Ying; Guo, Hui-Juan; Shu, Rong; Wei, Kai-Li
The ultrasonic flaw detection equipment with remote control interface is researched and the automatic verification system is developed. According to use extensible markup language, the building of agreement instruction set and data analysis method database in the system software realizes the controllable designing and solves the diversification of unreleased device interfaces and agreements. By using the signal generator and a fixed attenuator cascading together, a dynamic error compensation method is proposed, completes what the fixed attenuator does in traditional verification and improves the accuracy of verification results. The automatic verification system operating results confirms that the feasibility of the system hardware and software architecture design and the correctness of the analysis method, while changes the status of traditional verification process cumbersome operations, and reduces labor intensity test personnel.
The Environmental Technology Verification (ETV) Program has been established to verify the performance characteristics of innovative environmental technologies and report this objective information, thus, accelerating the entrance of these new technologies into the marketplace. V...
DOT National Transportation Integrated Search
1978-03-01
This report deals with the selection of a test site, the design of a test installation, equipment selection, the installation and start-up of a pneumatic pipeline system for the transportation of tunnel muck. A review of prior pneumatic applications ...
Van Hoof, Joris J
2017-04-01
Currently, two different age verification systems (AVS) are implemented to enhance compliance with legal age limits for the sale of alcohol in the Netherlands. In this study, we tested the operational procedures and effectiveness of ID readers and remote age verification technology in supermarkets during the sale of alcohol. Following a trained alcohol purchase protocol, eight mystery shoppers (both underage and in the branch's reference age) conducted 132 alcohol purchase attempts in stores that were equipped with ID readers or remote age verification or were part of a control group. In stores equipped with an ID reader, 34% of the purchases were conducted without any mistakes (full compliance). In stores with remote age verification, full compliance was achieved in 87% of the cases. The control group reached 57% compliance, which is in line with the national average. Stores with ID readers perform worse than stores with remote age verification, and also worse than stores without any AVS. For both systems, in addition to effectiveness, public support and user friendliness need to be investigated. This study shows that remote age verification technology is a promising intervention that increases vendor compliance during the sales of age restricted products. © The Author 2016. Published by Oxford University Press on behalf of the European Public Health Association. All rights reserved.
Firing Room Remote Application Software Development
NASA Technical Reports Server (NTRS)
Liu, Kan
2015-01-01
The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.
Testing of electrical equipment for a commercial grade dedication program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, J.L.; Srinivas, N.
1995-10-01
The availability of qualified safety related replacement parts for use in nuclear power plants has decreased over time. This has caused many nuclear power plants to purchase commercial grade items (CGI) and utilize the commercial grade dedication process to qualify the items for use in nuclear safety related applications. The laboratories of Technical and Engineering Services (the testing facility of Detroit Edison) have been providing testing services for verification of critical characteristics of these items. This paper presents an overview of the experience in testing electrical equipment with an emphasis on fuses.
The Environmental Technology Verification (ETV) Program has been established by the U.S. Environmental Protection Agency (EPA) to verify the performance characteristics of innovative environmental technologies across all media and report this objective information to the states, ...
CPAS Parachute Testing, Model Development, & Verification
NASA Technical Reports Server (NTRS)
Romero, Leah M.
2013-01-01
Capsule Parachute Assembly System (CPAS) is the human rated parachute system for the Orion vehicle used during re-entry. Similar to Apollo parachute design. Human rating requires additional system redundancy. A Government Furnished Equipment (GFE) project responsible for: Design; Development testing; Performance modeling; Fabrication; Qualification; Delivery
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, the STS-96 crew looks over equipment during a payload Interface Verification Test for the upcoming mission to the International Space Station. From left are Commander Kent Rominger, Mission Specialists Tamara Jernigan and Valery Tokarev of Russia, Pilot Rick Husband, and Mission Specialists Ellen Ochoa and Julie Payette (backs to the camera). They are listening to Chris Jaskolka of Boeing talk about the equipment. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m. EDT.
NASA Astrophysics Data System (ADS)
Boyarnikov, A. V.; Boyarnikova, L. V.; Kozhushko, A. A.; Sekachev, A. F.
2017-08-01
In the article the process of verification (calibration) of oil metering units secondary equipment is considered. The purpose of the work is to increase the reliability and reduce the complexity of this process by developing a software and hardware system that provides automated verification and calibration. The hardware part of this complex carries out the commutation of the measuring channels of the verified controller and the reference channels of the calibrator in accordance with the introduced algorithm. The developed software allows controlling the commutation of channels, setting values on the calibrator, reading the measured data from the controller, calculating errors and compiling protocols. This system can be used for checking the controllers of the secondary equipment of the oil metering units in the automatic verification mode (with the open communication protocol) or in the semi-automatic verification mode (without it). The peculiar feature of the approach used is the development of a universal signal switch operating under software control, which can be configured for various verification methods (calibration), which allows to cover the entire range of controllers of metering units secondary equipment. The use of automatic verification with the help of a hardware and software system allows to shorten the verification time by 5-10 times and to increase the reliability of measurements, excluding the influence of the human factor.
Cleaning verification by air/water impingement
NASA Technical Reports Server (NTRS)
Jones, Lisa L.; Littlefield, Maria D.; Melton, Gregory S.; Caimi, Raoul E. B.; Thaxton, Eric A.
1995-01-01
This paper will discuss how the Kennedy Space Center intends to perform precision cleaning verification by Air/Water Impingement in lieu of chlorofluorocarbon-113 gravimetric nonvolatile residue analysis (NVR). Test results will be given that demonstrate the effectiveness of the Air/Water system. A brief discussion of the Total Carbon method via the use of a high temperature combustion analyzer will also be given. The necessary equipment for impingement will be shown along with other possible applications of this technology.
Apollo experience report: Communications system flight evaluation and verification
NASA Technical Reports Server (NTRS)
Travis, D.; Royston, C. L., Jr.
1972-01-01
Flight tests of the synergetic operation of the spacecraft and earth based communications equipment were accomplished during Apollo missions AS-202 through Apollo 12. The primary goals of these tests were to verify that the communications system would adequately support lunar landing missions and to establish the inflight communications system performance characteristics. To attain these goals, a communications system flight verification and evaluation team was established. The concept of the team operations, the evolution of the evaluation processes, synopses of the team activities associated with each mission, and major conclusions and recommendations resulting from the performance evaluation are represented.
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2009-01-01
This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.
40 CFR 745.225 - Accreditation of training programs: target housing and child-occupied facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment to be used for lecture and hands-on training. (B) A copy of the course test blueprint for each..., the delivery of the lecture, course test, hands-on training, and assessment activities. This includes... containment and cleanup methods, and post-renovation cleaning verification. (vii) The dust sampling technician...
40 CFR 745.225 - Accreditation of training programs: target housing and child-occupied facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment to be used for lecture and hands-on training. (B) A copy of the course test blueprint for each..., the delivery of the lecture, course test, hands-on training, and assessment activities. This includes... containment and cleanup methods, and post-renovation cleaning verification. (vii) The dust sampling technician...
DOT National Transportation Integrated Search
2012-03-01
The Federal Motor Vehicle Safety Standards (FMVSS) establish minimum levels for vehicle safety, and manufacturers of motor vehicle and equipment items must comply with these standards. The National Highway Traffic Safety Administration (NHTSA) contra...
Risk Mitigation Testing with the BepiColombo MPO SADA
NASA Astrophysics Data System (ADS)
Zemann, J.; Heinrich, B.; Skulicz, A.; Madsen, M.; Weisenstein, W.; Modugno, F.; Althaus, F.; Panhofer, T.; Osterseher, G.
2013-09-01
A Solar Array (SA) Drive Assembly (SADA) for the BepiColombo mission is being developed and qualified at RUAG Space Zürich (RSSZ). The system is consisting of the Solar Array Drive Mechanism (SADM) and the Solar Array Drive Electronics (SADE) which is subcontracted to RUAG Space Austria (RSA).This paper deals with the risk mitigation activities and the lesson learnt from this development. In specific following topics substantiated by bread board (BB) test results will be addressed in detail:Slipring Bread Board Test: Verification of lifetime and electrical performance of carbon brush technology Potentiometer BB Tests: Focus on lifetime verification (> 650000 revolution) and accuracy requirement SADM EM BB Test: Subcomponent (front-bearing and gearbox) characterization; complete test campaign equivalent to QM test.EM SADM/ SADE Combined Test: Verification of combined performance (accuracy, torque margin) and micro-vibration testing of SADA systemSADE Bread Board Test: Parameter optimization; Test campaign equivalent to QM testThe main improvements identified in frame of BB testing and already implemented in the SADM EM/QM and SADE EQM are:• Improved preload device for gearbox• Improved motor ball-bearing assembly• Position sensor improvements• Calibration process for potentiometer• SADE motor controller optimization toachieve required running smoothness• Overall improvement of test equipment.
A Study on Performance and Safety Tests of Electrosurgical Equipment.
Tavakoli Golpaygani, A; Movahedi, M M; Reza, M
2016-09-01
Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, STS-96 Mission Specialist Julie Payette closes a container, part of the equipment to be carried on the SPACEHAB and mission STS-96. She and other crew members Commander Kent Rominger, Pilot Rick Husband, and Mission Speciaists Ellen Ochoa, Tamara Jernigan, Dan Barry and Valery Tokarev of Russia are at KSC for a payload Interface Verification Test for the upcoming mission to the International Space Station . Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
During a payload Interface Verification Test (IVT) for the upcoming mission to the International Space Station , Chris Jaskolka of Boeing points out a piece of equipment in the SPACEHAB module to STS-96 Commander Kent Rominger, Mission Specialist Ellen Ochoa and Pilot Rick Husband. Other crew members visiting KSC for the IVT are Mission Specialists Tamara Jernigan, Dan Barry, Julie Payette and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m. EDT.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, James Behling, with Boeing, talks about equipment for mission STS-96 during a payload Interface Verification Test (IVT). Watching are (from left) Mission Specialists Ellen Ochoa, Julie Payette and Dan Berry, and Pilot Rick Husband. Other STS-96 crew members at KSC for the IVT are Commander Kent Rominger and Mission Specialists Tamara Jernigan and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
NASA Technical Reports Server (NTRS)
Burns, H. D.; Mitchell, M. A.; McMillian, J. H.; Farner, B. R.; Harper, S. A.; Peralta, S. F.; Lowrey, N. M.; Ross, H. R.; Juarez, A.
2015-01-01
Since the 1990's, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have used hydrochlorofluorocarbon-225 (HCFC-225), a Class II ozone-depleting substance, to safety clean and verify the cleanliness of large scale propulsion oxygen systems and associated test facilities. In 2012 through 2014, test laboratories at MSFC, SSC, and Johnson Space Center-White Sands Test Facility collaborated to seek out, test, and qualify an environmentally preferred replacement for HCFC-225. Candidate solvents were selected, a test plan was developed, and the products were tested for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Honewell Soltice (TradeMark) Performance Fluid (trans-1-chloro-3,3, 3-trifluoropropene) was selected to replace HCFC-225 at NASA's MSFC and SSC rocket propulsion test facilities.
Control structural interaction testbed: A model for multiple flexible body verification
NASA Technical Reports Server (NTRS)
Chory, M. A.; Cohen, A. L.; Manning, R. A.; Narigon, M. L.; Spector, V. A.
1993-01-01
Conventional end-to-end ground tests for verification of control system performance become increasingly complicated with the development of large, multiple flexible body spacecraft structures. The expense of accurately reproducing the on-orbit dynamic environment and the attendant difficulties in reducing and accounting for ground test effects limits the value of these tests. TRW has developed a building block approach whereby a combination of analysis, simulation, and test has replaced end-to-end performance verification by ground test. Tests are performed at the component, subsystem, and system level on engineering testbeds. These tests are aimed at authenticating models to be used in end-to-end performance verification simulations: component and subassembly engineering tests and analyses establish models and critical parameters, unit level engineering and acceptance tests refine models, and subsystem level tests confirm the models' overall behavior. The Precision Control of Agile Spacecraft (PCAS) project has developed a control structural interaction testbed with a multibody flexible structure to investigate new methods of precision control. This testbed is a model for TRW's approach to verifying control system performance. This approach has several advantages: (1) no allocation for test measurement errors is required, increasing flight hardware design allocations; (2) the approach permits greater latitude in investigating off-nominal conditions and parametric sensitivities; and (3) the simulation approach is cost effective, because the investment is in understanding the root behavior of the flight hardware and not in the ground test equipment and environment.
Development of a Hampton University Program for Novel Breast Cancer Imaging and Therapy Research
2013-04-01
intracavitary brachytherapy procedures during laboratory pre-clinical imaging and dosimetry equipment testing, calibration and data processing, in collaboration... electronics and detector instrumentation development; 4) breast phantom construction and implantation; 5) laboratory pre-clinical device testing...such as the ionization chamber, diode, radiographic verification 6 films and thermoluminescent dosimeters ( TLD ) but the scintillator fiber detectors
Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1
NASA Technical Reports Server (NTRS)
1976-01-01
The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... Verification Services Inc. as a Nationally Recognized Certification Program for Small Electric Motors AGENCY... FURTHER INFORMATION CONTACT: Mr. Lucas Adin, U.S. Department of Energy, Building Technologies Office, Mail... conservation requirements for, among other things, electric motors and small electric motors, including test...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... Verification Services Inc. as a Nationally Recognized Certification Program for Small Electric Motors AGENCY... conservation requirements for, among other things, electric motors and small electric motors, including test...\\ Section 345(c) of EPCA directs the Secretary of Energy to require manufacturers of electric motors ``to...
A Study on Performance and Safety Tests of Electrosurgical Equipment
Tavakoli Golpaygani, A.; Movahedi, M.M.; Reza, M.
2016-01-01
Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment. PMID:27853725
NASA Technical Reports Server (NTRS)
Bernstein, Karen S.; Kujala, Rod; Fogt, Vince; Romine, Paul
2011-01-01
This document establishes the structural requirements for human-rated spaceflight hardware including launch vehicles, spacecraft and payloads. These requirements are applicable to Government Furnished Equipment activities as well as all related contractor, subcontractor and commercial efforts. These requirements are not imposed on systems other than human-rated spacecraft, such as ground test articles, but may be tailored for use in specific cases where it is prudent to do so such as for personnel safety or when assets are at risk. The requirements in this document are focused on design rather than verification. Implementation of the requirements is expected to be described in a Structural Verification Plan (SVP), which should describe the verification of each structural item for the applicable requirements. The SVP may also document unique verifications that meet or exceed these requirements with NASA Technical Authority approval.
Seismic verification of nuclear plant equipment anchorage, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Czarnecki, R M
1991-06-01
Guidelines have been developed to evaluate the seismic adequacy of the anchorage of various classes of electrical and mechanical equipment in nuclear power plants covered by NRC Unresolved Safety Issue A-46. The guidelines consist of anchorage strength capacities as a function of key equipment and installation parameters. The strength criteria for expansion anchor bolts were developed by collecting and analyzing a large quantity of test data. The strength criteria for Cast-in-Place bolts and welds to embedded steel plates and channels were taken from existing nuclear-industry design guidelines. For anchorage used in low strength concrete and in concrete with cracks, appropriatemore » strength reduction factors were developed. Reduction factors for parameters such as edge distance, spacing and embedment depth are also included. Based on the anchorage capacity and equipment configuration, inspection checklists for field verification of anchorage adequacy were developed, and provisions for outliners that can be used to further investigate anchorages that cannot be verified in the field were prepared. The screening tables are based on an analysis of the anchorage forces developed by common equipment types and on strength criteria to quantify the holding power of anchor bolts and welds. A computer code EBAC was developed for the evaluation of the adequacy of the equipment anchorage. Guidelines to evaluate anchorage adequacy for vertical and horizontal tanks and horizontal heat exchangers were also developed.« less
Protection of the electronic components of measuring equipment from the X-ray radiation
NASA Astrophysics Data System (ADS)
Perez Vasquez, N. O.; Kostrin, D. K.; Uhov, A. A.
2018-02-01
In this work the effect of X-ray radiation on the operation of integrated circuits of the measurement equipment is discussed. The results of the calculations of a shielding system, allowing using integrated circuits with a high degree of integration in the vicinity of the X-ray source, are shown. The results of the verification of two measurement devices that was used for more than five years in the facility for training and testing of X-ray tubes are presented.
Development of infrared goggles and prototype
NASA Astrophysics Data System (ADS)
Tsuchimoto, Kouzou; Komatsubara, Shigeyuki; Fujikawa, Masaru; Otsuka, Toshiaki; Kan, Moriyasu; Matsumura, Norihide
2006-05-01
We aimed at developing a hands free type practical wearable thermography which will not hinder walking or working of the person wearing the equipment. We installed a small format camera core module, which was recently developed, into the fire fighter's helmet and incorporated image transmission function over radio to the equipment. We combined this thermography with a see-through type head mount display, and called it "Infrared Goggles". A prototype was developed for verification test of lifesaving support system in fire fighting activities.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, the STS-96 crew looks at equipment as part of a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station . From left are Mission Specialist Ellen Ochoa (behind the opened storage cover ), Commander Kent Rominger, Pilot Rick Husband (holding a lithium hydroxide canister) and Mission Specialists Dan Barry, Valery Tokarev of Russia and Julie Payette. In the background is TTI interpreter Valentina Maydell. The other crew member at KSC for the IVT is Mission Specialist Tamara Jernigan. Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, STS-96 crew members look over equipment during a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station. From left are Khristal Parker, with Boeing; Mission Specialist Dan Barry, Pilot Rick Husband, Mission Specialist Tamara Jernigan, and at the far right, Mission Specialist Julie Payette. An unidentified worker is in the background. Also at KSC for the IVT are Commander Kent Rominger and Mission Specialists Ellen Ochoa and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, STS-96 Mission Specialist Valery Tokarev of Russia (left) and Commander Kent Rominger (second from right) listen to Lynn Ashby (far right), with JSC, talking about the SPACEHAB equipment in front of them during a payload Interface Verification Test (IVT). In the background behind Tokarev is TTI interpreter Valentina Maydell. Other STS-96 crew members at KSC for the IVT are Pilot Rick Husband and Mission Specialists Dan Barry, Ellen Ochoa, Tamara Jernigan and Julie Payette. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, STS-96 Mission Specialist Valery Tokarev (in foreground) of the Russian Space Agency closes a container, part of the equipment that will be in the SPACEHAB module on mission STS-96. Behind Tokarev are Pilot Rick Husband (left) and Mission Specialist Dan Barry (right). Other crew members at KSC for a payload Interface Verification Test for the upcoming mission to the International Space Station are Commander Kent Rominger and Mission Specialists Ellen Ochoa, Tamara Jernigan and Julie Payette. Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
During a payload Interface Verification Test (IVT) in the SPACEHAB Facility, STS-96 Mission Specialist Tamara Jernigan checks over instructions while Mission Specialist Dan Barry looks up from the Sequential Shunt Unit (SSU) in front of him to other equipment Lynn Ashby (right), with Johnson Space Center, is pointing at. Other crew members at KSC for the IVT are Commander Kent Rominger, Pilot Rick Husband, and Mission Specialists Ellen Ochoa, Julie Payette and Valery Tokarev of Russia. The SSU is part of the cargo on Mission STS-96, which carries the SPACEHAB Logistics Double Module, with equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
During a payload Interface Verification Test (IVT) in the SPACEHAB Facility, STS-96 Pilot Rick Husband and Mission Specialist Ellen Ochoa (on the left) and Mission Specialist Julie Payette (on the far right) listen to Khristal Parker (second from right), with Boeing, explain about the equipment in front of them. Other crew members at KSC for the IVT are Commander Kent Rominger and Mission Specialists Tamara Jernigan, Dan Barry and Valery Tokarev of Russia. The SSU is part of the cargo on Mission STS-96, which carries the SPACEHAB Logistics Double Module, with equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility for a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station are (kneeling) STS-96 Mission Specialists Julie Payette and Ellen Ochoa, Pilot Rick Husband, and (standing at right) Mission Specialist Dan Barry. At the left is James Behling, with Boeing, explaining some of the equipment that will be on board STS-96. Other STS-96 crew members at KSC for the IVT are Commander Kent Rominger and Mission Specialists Tamara Jernigan and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
Programs for Testing an SSME-Monitoring System
NASA Technical Reports Server (NTRS)
Lang, Andre; Cecil, Jimmie; Heusinger, Ralph; Freestone, Kathleen; Blue, Lisa; Wilkerson, DeLisa; McMahon, Leigh Anne; Hall, Richard B.; Varnavas, Kosta; Smith, Keary;
2007-01-01
A suite of computer programs has been developed for special test equipment (STE) that is used in verification testing of the Health Management Computer Integrated Rack Assembly (HMCIRA), a ground-based system of analog and digital electronic hardware and software for "flight-like" testing for development of components of an advanced health-management system for the space shuttle main engine (SSME). The STE software enables the STE to simulate the analog input and the data flow of an SSME test firing from start to finish.
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
The Search for Nonflammable Solvent Alternatives for Cleaning Aerospace Oxygen Systems
NASA Technical Reports Server (NTRS)
Mitchell, Mark; Lowrey, Nikki
2012-01-01
Oxygen systems are susceptible to fires caused by particle and nonvolatile residue (NVR) contaminants, therefore cleaning and verification is essential for system safety. . Cleaning solvents used on oxygen system components must be either nonflammable in pure oxygen or complete removal must be assured for system safety. . CFC -113 was the solvent of choice before 1996 because it was effective, least toxic, compatible with most materials of construction, and non ]reactive with oxygen. When CFC -113 was phased out in 1996, HCFC -225 was selected as an interim replacement for cleaning propulsion oxygen systems at NASA. HCFC-225 production phase-out date is 01/01/2015. HCFC ]225 (AK ]225G) is used extensively at Marshall Space Flight Center and Stennis Space Center for cleaning and NVR verification on large propulsion oxygen systems, and propulsion test stands and ground support equipment. . Many components are too large for ultrasonic agitation - necessary for effective aqueous cleaning and NVR sampling. . Test stand equipment must be cleaned prior to installation of test hardware. Many items must be cleaned by wipe or flush in situ where complete removal of a flammable solvent cannot be assured. The search for a replacement solvent for these applications is ongoing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dowgiallo, E.J. Jr; Snellings, I.R.; Chapman, R.D.
1982-04-01
The Lectric Leopard manufactured by U.S. Electricar Corporation was tested at MERADCOM as part of the Department of Energy project to verify conformity to performance standards of electric vehicles. The Leopard is a standard Fiat Strada sedan which has been converted to an electric vehicle. It is powered by 16 6-V batteries through a silicon-controlled rectifier (SCR) Controller to a 23-hp series-wound d.c. motor. It is equipped with a five-speed manual transmission, power-assisted disc brakes in the front and drum brakes in the rear. It is not equipped with regenerative braking.
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification Program (ETV) to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. The goal of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fishbone, L.G.; Moussalli, G.; Naegele, G.
1994-04-01
An approach of short-notice random inspections (SNRIs) for inventory-change verification can enhance the effectiveness and efficiency of international safeguards at natural or low-enriched uranium (LEU) fuel fabrication plants. According to this approach, the plant operator declares the contents of nuclear material items before knowing if an inspection will occur to verify them. Additionally, items about which declarations are newly made should remain available for verification for an agreed time. This report details a six-month field test of the feasibility of such SNRIs which took place at the Westinghouse Electric Corporation Commercial Nuclear Fuel Division. Westinghouse personnel made daily declarations aboutmore » both feed and product items, uranium hexafluoride cylinders and finished fuel assemblies, using a custom-designed computer ``mailbox``. Safeguards inspectors from the IAEA conducted eight SNRIs to verify these declarations. Items from both strata were verified during the SNRIs by means of nondestructive assay equipment. The field test demonstrated the feasibility and practicality of key elements of the SNRI approach for a large LEU fuel fabrication plant.« less
Summary electrophoretic data base on human embryonic kidney cell strain 8514
NASA Technical Reports Server (NTRS)
Plank, L. D.; Kunze, M. E.; Arquiza, M. V.; Morrison, D. R.; Todd, P. W.
1985-01-01
To properly plan the electrophoresis equipment verification test (EEVT) and continuous flow electrophoresis system (CFES) experiments with human embryonic kidney cells, first a candidate cell lot had to be chosen on the basis of electrophoretic heterogeneity, growth potential, cytogenetics, and urokinase production. Cell lot 8514 from MA Bioproducts, Inc. was chosen for this purpose, and several essential analytical electrophoresis experiments were performed to test its final suitability for these experiments.
Verifying the Comprehensive Nuclear-Test-Ban Treaty by Radioxenon Monitoring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ringbom, Anders
2005-05-24
The current status of the ongoing establishment of a verification system for the Comprehensive Nuclear-Test-Ban Treaty using radioxenon detection is discussed. As an example of equipment used in this application the newly developed fully automatic noble gas sampling and detection system SAUNA is described, and data collected with this system are discussed. It is concluded that the most important remaining scientific challenges in the field concern event categorization and meteorological backtracking.
NASA Astrophysics Data System (ADS)
Yim, S.-W.; Yu, S.-D.; Kim, H.-R.; Kim, M.-J.; Park, C.-R.; Yang, S.-E.; Kim, W.-S.; Hyun, O.-B.; Sim, J.; Park, K.-B.; Oh, I.-S.
2010-11-01
We have constructed and completed the preparation for a long-term operation test of a superconducting fault current limiter (SFCL) in a Korea Electric Power Corporation (KEPCO) test grid. The SFCL with rating of 22.9 kV/630 A, 3-phases, has been connected to the 22.9 kV test grid equipped with reclosers and other protection devices in Gochang Power Testing Center of KEPCO. The main goals of the test are the verification of SFCL performance and protection coordination studies. A line-commutation type SFCL was fabricated and installed for this project, and the superconducting components were cooled by a cryo-cooler to 77 K in the sub-cooled liquid nitrogen pressurized by 3 bar of helium gas. The verification test includes un-manned - long-term operation with and without loads and fault tests. Since the test site is 170 km away from the laboratory, we will adopt the un-manned operation with real-time remote monitoring and controlling using high speed internet. For the fault tests, we will apply fault currents up to around 8 kArms to the SFCL using an artificial fault generator. The fault tests may allow us not only to confirm the current limiting capability of the SFCL, but also to adjust the SFCL - recloser coordination such as resetting over-current relay parameters. This paper describes the construction of the testing facilities and discusses the plans for the verification tests.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
At the SPACEHAB Facility, STS-96 Mission Specialist Ellen Ochoa and Commander Kent Rominger pause during a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station. Other crew members at KSC for the IVT are Pilot Rick Husband and Mission Specialists Tamara Jernigan, Dan Barry, Julie Payette and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m. EDT.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
Posing on the platform next to the SPACEHAB Logistics Double Module in the SPACEHAB Facility are the STS-96 crew (from left) Mission Specialists Dan Barry, Tamara Jernigan, Valery Tokarev of Russia, and Julie Payette; Pilot Rick Husband; Mission Specialist Ellen Ochoa; and Commander Kent Rominger. The crew is at KSC for a payload Interface Verification Test for their upcoming mission to the International Space Station. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
At the SPACEHAB Facility, STS-96 Mission Specialist Ellen Ochoa and Commander Kent Rominger smile for the camera during a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station. Other crew members at KSC for the IVT are Pilot Rick Husband and Mission Specialists Tamara Jernigan, Dan Barry, Julie Payette and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m. EDT.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, STS-96 Mission Specialists Dan Barry and Tamara Jernigan discuss procedures during a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station. Other STS-96 crew members at KSC for the IVT are Commander Kent Rominger, Pilot Rick Husband and Mission Specialists Ellen Ochoa, Julie Payette and Valery Tokarev of Russia. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
During a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station, STS-96 Mission Specialists Julie Payette, Dan Barry, and Valery Tokarev of Russia, look at a Sequential Shunt Unit in the SPACEHAB Facility. Other crew members at KSC for the IVT are Commander Kent Rominger, Pilot Rick Husband, and Mission Specialists Ellen Ochoa and Tamara Jernigan. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m. EDT.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility for a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station are (left to right) Mission Specialists Valery Tokarev, Julie Payette (holding a lithium hydroxide canister) and Dan Barry. Other crew members at KSC for the IVT are Commander Kent Rominger, Pilot Rick Husband and Mission Specialists Ellen Ochoa and Tamara Jernigan. Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... are engineers. UL today is comprised of five businesses, Product Safety, Verification Services, Life..., Director--Global Technical Research, UL Verification Services. Subscribed and sworn to before me this 20... (431.447(c)(4)) General Personnel Overview UL is a global independent safety science company with more...
Life sciences laboratory breadboard simulations for shuttle
NASA Technical Reports Server (NTRS)
Taketa, S. T.; Simmonds, R. C.; Callahan, P. X.
1975-01-01
Breadboard simulations of life sciences laboratory concepts for conducting bioresearch in space were undertaken as part of the concept verification testing program. Breadboard simulations were conducted to test concepts of and scope problems associated with bioresearch support equipment and facility requirements and their operational integration for conducting manned research in earth orbital missions. It emphasized requirements, functions, and procedures for candidate research on crew members (simulated) and subhuman primates and on typical radioisotope studies in rats, a rooster, and plants.
NASA Technical Reports Server (NTRS)
Robinson, D. N.
1985-01-01
Three major categories of testing are identified that are necessary to provide support for the development of constitutive equations for high temperature alloys. These are exploratory, charactrization and verification tests. Each category is addressed and specific examples of each are given. An extensive, but not exhaustive, set of references is provided concerning pertinent experimental results and their relationships to theoretical development. This guide to formulating a meaningful testing effort in support of consitutive equation development can also aid in defining the necessary testing equipment and instrumentation for the establishment of a deformation and structures testing laboratory.
242A Distributed Control System Year 2000 Acceptance Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEATS, M.C.
1999-08-31
This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct yearmore » 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.« less
2006-09-30
High-Pressure Waterjet • CO2 Pellet/Turbine Wheel • Ultrahigh-Pressure Waterjet 5 Process Water Reuse/Recycle • Cross-Flow Microfiltration ...documented on a process or laboratory form. Corrective action will involve taking all necessary steps to restore a measuring system to proper working order...In all cases, a nonconformance will be rectified before sample processing and analysis continues. If corrective action does not restore the
1. Exterior view of Signal Transfer Building (T28A), looking southwest. ...
1. Exterior view of Signal Transfer Building (T-28A), looking southwest. This structure houses controls for propellant transfer, instrumentation for testing, test data transmission receivers, data verification equipment, and centralized utilities for the Systems Integration Laboratory complex. The gantries of the Systems Integration Laboratory Building (T-28) are visible to the rear of this structure. - Air Force Plant PJKS, Systems Integration Laboratory, Signal Transfer Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
The Johnson Matthey SCCRT, v.1 technology is a urea-based SCR system combined with a CCRT filter designed for on-highway light, medium, and heavy heavy-duty diesel, urban and non-urban, bus exhaust gas recirculation (EGR)-or non-EGR-equipped engines for use with commercial ultra-...
ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: EXEL INDUSTRIAL AIRMIX SPRAY GUN
The Environmental Technology Verification Program has partnered with Concurrent Technologies Corp. to verify innovative coatings and coating equipment technologies for reducing air emissions. This report describes the performance of EXEL Industrial's Kremlin Airmix high transfer ...
Power System Test and Verification at Satellite Level
NASA Astrophysics Data System (ADS)
Simonelli, Giulio; Mourra, Olivier; Tonicello, Ferdinando
2008-09-01
Most of the articles on Power Systems deal with the architecture and technical solutions related to the functionalities of the power system and their performances. Very few articles, if none, address integration and verification aspects of the Power System at satellite level and the related issues with the Power EGSE (Electrical Ground Support Equipment), which, also, have to support the AIT/AIV (Assembly Integration Test and Verification) program of the satellite and, eventually, the launch campaign. In the last years a more complex development and testing concept based on MDVE (Model Based Development and Verification Environment) has been introduced. In the MDVE approach the simulation software is used to simulate the Satellite environment and, in the early stages, the satellites units. This approach changed significantly the Power EGSE requirements. Power EGSEs or, better, Power SCOEs (Special Check Out Equipment) are now requested to provide the instantaneous power generated by the solar array throughout the orbit. To achieve that, the Power SCOE interfaces to the RTS (Real Time Simulator) of the MDVE. The RTS provides the instantaneous settings, which belong to that point along the orbit, to the Power SCOE so that the Power SCOE generates the instantaneous {I,V} curve of the SA (Solar Array). That means a real time test for the power system, which is even more valuable for EO (Earth Observation) satellites where the Solar Array aspect angle to the sun is rarely fixed, and the power load profile can be particularly complex (for example, in radar applications). In this article the major issues related to integration and testing of Power Systems will be discussed taking into account different power system topologies (i.e. regulated bus, unregulated bus, battery bus, based on MPPT or S3R…). Also aspects about Power System AIT I/Fs (interfaces) and Umbilical I/Fs with the launcher and the Power SCOE I/Fs will be addressed. Last but not least, protection strategy of the Power System during AIT/AIV program will also be discussed. The objective of this discussion is also to provide the Power System Engineer with a checklist of key aspects linked to the satellite AIT/AIV program, that have to be considered in the early phases of a new power system development.
Crewed Space Vehicle Battery Safety Requirements
NASA Technical Reports Server (NTRS)
Jeevarajan, Judith A.; Darcy, Eric C.
2014-01-01
This requirements document is applicable to all batteries on crewed spacecraft, including vehicle, payload, and crew equipment batteries. It defines the specific provisions required to design a battery that is safe for ground personnel and crew members to handle and/or operate during all applicable phases of crewed missions, safe for use in the enclosed environment of a crewed space vehicle, and safe for use in launch vehicles, as well as in unpressurized spaces adjacent to the habitable portion of a space vehicle. The required provisions encompass hazard controls, design evaluation, and verification. The extent of the hazard controls and verification required depends on the applicability and credibility of the hazard to the specific battery design and applicable missions under review. Evaluation of the design and verification program results shall be completed prior to certification for flight and ground operations. This requirements document is geared toward the designers of battery systems to be used in crewed vehicles, crew equipment, crew suits, or batteries to be used in crewed vehicle systems and payloads (or experiments). This requirements document also applies to ground handling and testing of flight batteries. Specific design and verification requirements for a battery are dependent upon the battery chemistry, capacity, complexity, charging, environment, and application. The variety of battery chemistries available, combined with the variety of battery-powered applications, results in each battery application having specific, unique requirements pertinent to the specific battery application. However, there are basic requirements for all battery designs and applications, which are listed in section 4. Section 5 includes a description of hazards and controls and also includes requirements.
Development of Independent-type Optical CT
NASA Astrophysics Data System (ADS)
Yamaguchi, Tatsushi; Shiozawa, Daigoro; Rokunohe, Toshiaki; Kida, Junzo; Zhang, Wei
Optical current transformers (optical CTs) have features that they can be made much smaller and lighter than conventional electromagnetic induction transformers by their simple structure, and contribute to improvement of equipment reliability because of their excellent surge resistance performance. Authors consider optical CTs to be next generation transformers, and are conducting research and development of optical CTs aiming to apply to measuring and protection in electric power systems. Specifically we developed an independent-type optical CT by utilizing basic data of optical CTs accumulated for large current characteristics, temperature characteristics, vibration resistance characteristics, and so on. In performance verification, type tests complying with IEC standards, such as short-time current tests, insulation tests, accuracy tests, and so on, showed good results. This report describes basic principle and configuration of optical CTs. After that, as basic characteristics of optical CTs, conditions and results of verification tests for dielectric breakdown characteristics of sensor fibers, large current characteristics, temperature characteristics, and vibration resistance characteristics are described. Finally, development outline of the independent-type optical CT aiming to apply to all digital substation and its type tests results are described.
Investigation of high-strength bolt-tightening verification techniques.
DOT National Transportation Integrated Search
2016-03-01
The current means and methods of verifying that high-strength bolts have been properly tightened are very laborious and time : consuming. In some cases, the techniques require special equipment and, in other cases, the verification itself may be some...
2001-02-03
An overhead crane lowers the Multi-Purpose Logistics Module Donatello onto a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
NASA Technical Reports Server (NTRS)
Mitchell, Sherry L.
2018-01-01
The Customer Avionics Interface Development and Analysis (CAIDA) supports the testing of the Launch Control System (LCS), NASA's command and control system for the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle (MPCV), and ground support equipment. The objective of the semester-long internship was to support day-to-day operations of CAIDA and help prepare for verification and validation of CAIDA software.
Verification testing of the Pall Corporation Microza MF S;ystem equipped with a 3-inch filter module, took place between April 30 and August 9, 2000 in Manchester, NH. The source water was drawn from a canal connected to Lake Massabesic, the public reservoir that serves the Town...
Instrumentation for Verification of Bomb Damage Repair Computer Code.
1981-09-01
record the data, a conventional 14-track FM analog tape recorder was retained. The unknown factors of signal duration, test duration, and signal ...Kirtland Air Force Base computer centers for more detailed analyses. In addition to the analog recorder, signal conditioning equipment and amplifiers were...necessary to allow high quality data to be recorded. An Interrange Instrumentation Group (IRIG) code generator/reader placed a coded signal on the tape
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, (left to right) STS-96 Pilot Rick Husband and Mission Specialists Julie Payette and Ellen Ochoa work the straps on the Sequential Shunt Unit (SSU) in front of them. The STS-96 crew is at KSC for a payload Interface Verification Test (IVT) for its upcoming mission to the International Space Station . Other crew members at KSC for the IVT are Commander Kent Rominger and Mission Specialists Tamara Jernigan, Dan Barry and Valery Tokarev of Russia. The SSU is part of the cargo on Mission STS-96, which carries the SPACEHAB Logistics Double Module, with equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
During a payload Interface Verification Test (IVT) in the SPACEHAB Facility, STS-96 Mission Specialist Valery Tokarev of Russia (second from left) and Commander Kent Rominger learn about the Sequential Shunt Unit (SSU) in front of them from Lynn Ashby (far right), with Johnson Space Center. At the far left looking on is TTI interpreter Valentina Maydell. Other crew members at KSC for the IVT are Pilot Rick Husband and Mission Specialists Ellen Ochoa, Tamara Jernigan, Dan Barry and Julie Payette. The SSU is part of the cargo on Mission STS-96, which carries the SPACEHAB Logistics Double Module, with equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
DOT National Transportation Integrated Search
2014-04-01
The objective of this project was to quantify the effectiveness of the rail inspection ground verification process. More specifically, : the project focused on comparing the effectiveness of conventional versus phased array probes to manually detect ...
Multi-centre audit of VMAT planning and pre-treatment verification.
Jurado-Bruggeman, Diego; Hernández, Victor; Sáez, Jordi; Navarro, David; Pino, Francisco; Martínez, Tatiana; Alayrach, Maria-Elena; Ailleres, Norbert; Melero, Alejandro; Jornet, Núria
2017-08-01
We performed a multi-centre intercomparison of VMAT dose planning and pre-treatment verification. The aims were to analyse the dose plans in terms of dosimetric quality and deliverability, and to validate whether in-house pre-treatment verification results agreed with those of an external audit. The nine participating centres encompassed different machines, equipment, and methodologies. Two mock cases (prostate and head and neck) were planned using one and two arcs. A plan quality index was defined to compare the plans and different complexity indices were calculated to check their deliverability. We compared gamma index pass rates using the centre's equipment and methodology to those of an external audit (global 3D gamma, absolute dose differences, 10% of maximum dose threshold). Log-file analysis was performed to look for delivery errors. All centres fulfilled the dosimetric goals but plan quality and delivery complexity were heterogeneous and uncorrelated, depending on the manufacturer and the planner's methodology. Pre-treatment verifications results were within tolerance in all cases for gamma 3%-3mm evaluation. Nevertheless, differences between the external audit and in-house measurements arose due to different equipment or methodology, especially for 2%-2mm criteria with differences up to 20%. No correlation was found between complexity indices and verification results amongst centres. All plans fulfilled dosimetric constraints, but plan quality and complexity did not correlate and were strongly dependent on the planner and the vendor. In-house measurements cannot completely replace external audits for credentialing. Copyright © 2017 Elsevier B.V. All rights reserved.
Acceptance and commissioning of a treatment planning system based on Monte Carlo calculations.
Lopez-Tarjuelo, J; Garcia-Molla, R; Juan-Senabre, X J; Quiros-Higueras, J D; Santos-Serra, A; de Marco-Blancas, N; Calzada-Feliu, S
2014-04-01
The Monaco Treatment Planning System (TPS), based on a virtual energy fluence model of the photon beam head components of the linac and a dose computation engine made with Monte Carlo (MC) algorithm X-Ray Voxel MC (XVMC), has been tested before being put into clinical use. An Elekta Synergy with 6 MV was characterized using routine equipment. After the machine's model was installed, a set of functionality, geometric, dosimetric and data transfer tests were performed. The dosimetric tests included dose calculations in water, heterogeneous phantoms and Intensity Modulated Radiation Therapy (IMRT) verifications. Data transfer tests were run for every imaging device, TPS and the electronic medical record linked to Monaco. Functionality and geometric tests were run properly. Dose calculations in water were in accordance with measurements so that, in 95% of cases, differences were up to 1.9%. Dose calculation in heterogeneous media showed expected results found in the literature. IMRT verification results with an ionization chamber led to dose differences lower than 2.5% for points inside a standard gradient. When an 2-D array was used, all the fields passed the g (3%, 3 mm) test with a percentage of succeeding points between 90% and 95%, of which the majority of the mentioned fields had a percentage of succeeding points between 95% and 100%. Data transfer caused problems that had to be solved by means of changing our workflow. In general, tests led to satisfactory results. Monaco performance complied with published international recommendations and scored highly in the dosimetric ambit. However, the problems detected when the TPS was put to work together with our current equipment showed that this kind of product must be completely commissioned, without neglecting data workflow, before treating the first patient.
NASA Technical Reports Server (NTRS)
Yew, Calinda; Whitehouse, Paul; Lui, Yan; Banks, Kimberly
2016-01-01
JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.
NASA Technical Reports Server (NTRS)
Rinehart, Maegan L.
2011-01-01
The purpose of this activity is to provide the Mechanical Components Test Facility (MCTF) with the capability to obtain electronic leak test and proof pressure data, Payload and Components Real-time Automated Test System (PACRATS) data acquisition software will be utilized to display real-time data. It will record leak rates and pressure/vacuum level(s) simultaneously. This added functionality will provide electronic leak test and pressure data at specified sampling frequencies. Electronically stored data will provide ES61 with increased data security, analysis, and accuracy. The tasks performed in this procedure are to verify PACRATS only, and are not intended to provide verifications for MCTF equipment.
To support the Nation's Homeland Security Program, this U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) project is conducted to verify the performance of commercially available products, methods, and equipment for decontamination of hard and...
TDRSS system configuration study for space shuttle program
NASA Technical Reports Server (NTRS)
1978-01-01
This study was set up to assure that operation of the shuttle orbiter communications systems met the program requirements when subjected to electrical conditions similar to those which will be encountered during the operational mission. The test program intended to implement an integrated test bed, consisting of applicable orbiter, EVA, payload simulator, STDN, and AF/SCF, as well as the TDRSS equipment. The stated intention of Task 501 Program was to configure the test bed with prototype hardware for a system development test and production hardware for a system verification test. In case of TDRSS when the hardware was not available, simulators whose functional performance was certified to meet appropriate end item specification were used.
First Scientific Working Group Meeting of Airborne Doppler Lidar Wind Velocity Measurement Program
NASA Technical Reports Server (NTRS)
Kaufman, J. W. (Editor)
1980-01-01
The purpose of the first scientific working group meeting was fourfold: (1) to identify flight test options for engineering verification of the MSFC Doppler Lidar; (2) to identify flight test options for gathering data for scientific/technology applications; (3) to identify additional support equipment needed on the CV 990 aircraft for the flight tests; and (4) to identify postflight data processing and data sets requirements. The working group identified approximately ten flight options for gathering data on atmospheric dynamics processes, including turbulence, valley breezes, and thunderstorm cloud anvil and cold air outflow dynamics. These test options will be used as a basis for planning the fiscal year 1981 tests of the Doppler Lidar system.
46 CFR 162.060-5 - Incorporation by reference.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-5 Incorporation by...), Environmental Technology Verification Program, National Risk Management Research Laboratory Office of Research...
STS-96 crew takes part in payload Interface Verification Test
NASA Technical Reports Server (NTRS)
1999-01-01
In the SPACEHAB Facility, (from left) STS-96 Mission Specialist Julie Payette, Pilot Rick Husband and Mission Specialist Ellen Ochoa learn about the Sequential Shunt Unit (SSU) in front of them from Lynn Ashby (far right), with Johnson Space Center. The STS-96 crew is at KSC for a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station . Other crew members at KSC for the IVT are Commander Kent Rominger and Mission Specialists Tamara Jernigan, Dan Barry and Valery Tokarev of Russia. The SSU is part of the cargo on Mission STS-96, which carries the SPACEHAB Logistics Double Module, with equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m.
LLCEDATA and LLCECALC for Windows version 1.0, Volume 3: Software verification and validation
DOE Office of Scientific and Technical Information (OSTI.GOV)
McFadden, J.G.
1998-09-04
LLCEDATA and LLCECALC for Windows are user-friendly computer software programs that work together to determine the proper waste designation, handling, and disposition requirements for Long Length Contaminated Equipment (LLCE). LLCEDATA reads from a variety of data bases to produce an equipment data file(EDF) that represents a snapshot of both the LLCE and the tank from which it originates. LLCECALC reads the EDF and the gamma assay file (AV2) that is produced by the flexible Receiver Gamma Energy Analysis System. LLCECALC performs corrections to the AV2 file as it is being read and characterizes the LLCE. Both programs produce a varietymore » of reports, including a characterization report and a status report. The status report documents each action taken by the user, LLCEDATA, and LLCECALC. Documentation for LLCEDATA and LLCECALC for Windows is available in three volumes. Volume 1 is a user`s manual, which is intended as a quick reference for both LLCEDATA and LLCECALC. Volume 2 is a technical manual, which discusses system limitations and provides recommendations to the LLCE process. Volume 3 documents LLCEDATA and LLCECALC`s verification and validation. Two of the three installation test cases, from Volume 1, are independently confirmed. Data bases used in LLCEDATA are verified and referenced. Both phases of LLCECALC process gamma and characterization, are extensively tested to verify that the methodology and algorithms used are correct.« less
The Hyper-X Flight Systems Validation Program
NASA Technical Reports Server (NTRS)
Redifer, Matthew; Lin, Yohan; Bessent, Courtney Amos; Barklow, Carole
2007-01-01
For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.
A three degree of freedom manipulator used for store separation wind tunnel test
NASA Astrophysics Data System (ADS)
Wei, R.; Che, B.-H.; Sun, C.-B.; Zhang, J.; Lu, Y.-Q.
2018-06-01
A three degree of freedom manipulator is presented, which is used for store separation wind tunnel test. It is a kind of mechatronics product, have small volume and large moment of torque. The paper researched the design principle of wind tunnel test equipment, also introduced the transmission principle design, physical design, control system design, drive element selection calculation and verification, dynamics computation and static structural computation of the manipulator. To satisfy the design principle of wind tunnel test equipment, some optimization design are made include optimizes the structure of drive element and cable, fairing configuration, overall dimension so that to make the device more suitable for the wind tunnel test. Some tests are made to verify the parameters of the manipulator. The results show that the device improves the load from 100 Nm to 250 Nm, control accuracy from 0.1°to 0.05°in pitch and yaw, also improves load from 10 Nm to 20 Nm, control accuracy from 0.1°to 0.05°in roll.
NASA Astrophysics Data System (ADS)
Martin, L.; Schatalov, M.; Hagner, M.; Goltz, U.; Maibaum, O.
Today's software for aerospace systems typically is very complex. This is due to the increasing number of features as well as the high demand for safety, reliability, and quality. This complexity also leads to significant higher software development costs. To handle the software complexity, a structured development process is necessary. Additionally, compliance with relevant standards for quality assurance is a mandatory concern. To assure high software quality, techniques for verification are necessary. Besides traditional techniques like testing, automated verification techniques like model checking become more popular. The latter examine the whole state space and, consequently, result in a full test coverage. Nevertheless, despite the obvious advantages, this technique is rarely yet used for the development of aerospace systems. In this paper, we propose a tool-supported methodology for the development and formal verification of safety-critical software in the aerospace domain. The methodology relies on the V-Model and defines a comprehensive work flow for model-based software development as well as automated verification in compliance to the European standard series ECSS-E-ST-40C. Furthermore, our methodology supports the generation and deployment of code. For tool support we use the tool SCADE Suite (Esterel Technology), an integrated design environment that covers all the requirements for our methodology. The SCADE Suite is well established in avionics and defense, rail transportation, energy and heavy equipment industries. For evaluation purposes, we apply our approach to an up-to-date case study of the TET-1 satellite bus. In particular, the attitude and orbit control software is considered. The behavioral models for the subsystem are developed, formally verified, and optimized.
NASA Technical Reports Server (NTRS)
Hornung, Steven D.; Biesinger, Paul; Kirsch, Mike; Beeson, Harold; Leuders, Kathy
1999-01-01
The NASA White Sands Test Facility (WSTF) has developed an entirely aqueous final cleaning and verification process to replace the current chlorofluorocarbon (CFC) 113 based process. This process has been accepted for final cleaning and cleanliness verification of WSTF ground support equipment. The aqueous process relies on ultrapure water at 50 C (323 K) and ultrasonic agitation for removal of organic compounds and particulate. The cleanliness is verified bv determining the total organic carbon (TOC) content and filtration with particulate counting. The effectiveness of the aqueous methods for detecting hydrocarbon contamination and particulate was compared to the accepted CFC 113 sampling procedures. Testing with known contaminants, such as hydraulic fluid and cutting and lubricating oils, to establish a correlation between aqueous TOC and CFC 113 nonvolatile residue (NVR) was performed. Particulate sampling on cleaned batches of hardware that were randomly separated and sampled by the two methods was performed. This paper presents the approach and results, and discusses the issues in establishing the equivalence of aqueous sampling to CFC 113 sampling, while describing the approach for implementing aqueous techniques on Space Shuttle Propulsion hardware.
Study on micro-water measurement method based on SF6 insulation equipment in high altitude area
NASA Astrophysics Data System (ADS)
Zhang, Han; Liu, Yajin; Yan, Jun; Liu, Zhijian; Yan, Yongfei
2018-06-01
Moisture content is an important indicator of the insulation and arc extinguishing performance of SF6 insulated electrical equipment. The research shows that moisture measurements are strongly influenced by altitude pressures and the different order of pressure correction and temperature correction calculation, different calculation results will result. Therefore, in this paper, we studies the pressure and temperature environment based on moisture test of SF6 gas insulated equipment in power industry. Firstly, the PVT characteristics of pure SF6 gas and water vapor were analyzed and put forward the necessity of pressure correction, then combined the Pitzer-Veli equation of SF6 gas and Water Pitzer-Veli equation to fit PVT equation of state of SF6-H20 that suitable for electric power industry and deduced the Correction Formula of Moisture Measurement in SF6 Gas. Finally, through experiments, completion of the calibration formula optimization and verification SF6 electrical equipment on, proof of the applicability and effectiveness of the correction formula.
2001-02-03
The lid is off the shipping container with the Multi-Purpose Logistics Module Donatello inside. It sits on a transporter inside the Space Station Processing Facility. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
2001-02-03
Workers in the Space Station Processing Facility attach an overhead crane to the Multi-Purpose Logistics Module Donatello to lift it out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
2001-02-03
In the Space Station Processing Facility, workers help guide the overhead crane as it lifts the Multi-Purpose Logistics Module Donatello out of the shipping container. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
2001-02-03
In the Space Station Processing Facility, workers help guide the Multi-Purpose Logistics Module Donatello as it moves the length of the SSPF toward a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
2001-02-03
In the Space Station Processing Facility, workers wait for the Multi-Purpose Logistics Module Donatello, suspended by an overhead crane, to move onto a workstand. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004
NASA Astrophysics Data System (ADS)
Zucca, J. J.
2014-05-01
On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.
Sustainable reduction of bioreactor contamination in an industrial fermentation pilot plant.
Junker, Beth; Lester, Michael; Leporati, James; Schmitt, John; Kovatch, Michael; Borysewicz, Stan; Maciejak, Waldemar; Seeley, Anna; Hesse, Michelle; Connors, Neal; Brix, Thomas; Creveling, Eric; Salmon, Peter
2006-10-01
Facility experience primarily in drug-oriented fermentation equipment (producing small molecules such as secondary metabolites, bioconversions, and enzymes) and, to a lesser extent, in biologics-oriented fermentation equipment (producing large molecules such as recombinant proteins and microbial vaccines) in an industrial fermentation pilot plant over the past 15 years is described. Potential approaches for equipment design and maintenance, operational procedures, validation/verification testing, medium selection, culture purity/sterility analysis, and contamination investigation are presented, and those approaches implemented are identified. Failure data collected for pilot plant operation for nearly 15 years are presented and best practices for documentation and tracking are outlined. This analysis does not exhaustively discuss available design, operational and procedural options; rather it selectively presents what has been determined to be beneficial in an industrial pilot plant setting. Literature references have been incorporated to provide background and context where appropriate.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaSalle, F.R.; Golbeg, P.R.; Chenault, D.M.
For reactor and nuclear facilities, both Title 10, Code of Federal Regulations, Part 50, and US Department of Energy Order 6430.1A require assessments of the interaction of non-Safety Class 1 piping and equipment with Safety Class 1 piping and equipment during a seismic event to maintain the safety function. The safety class systems of nuclear reactors or nuclear facilities are designed to the applicable American Society of Mechanical Engineers standards and Seismic Category 1 criteria that require rigorous analysis, construction, and quality assurance. Because non-safety class systems are generally designed to lesser standards and seismic criteria, they may become missilesmore » during a safe shutdown earthquake. The resistance of piping, tubing, and equipment to seismically generated missiles is addressed in the paper. Gross plastic and local penetration failures are considered with applicable test verification. Missile types and seismic zones of influence are discussed. Field qualification data are also developed for missile evaluation.« less
Mao, Xin; Yang, Yue
2017-02-01
The study aims to explore the challenges and the gaps faced by Chinese Drug Control Institutes in achieving the standards of World Health Organization (WHO) Medicine Prequalification. The study was undertaken with 6 Provincial Drug Control Institutes in China from November 2012 to November 2013. The study assessed key elements required to comply with WHO Good Practices for Pharmaceutical Quality Control Laboratories (GPPQCL). For GPPQCL, the study found gaps in quality management system, control of documentation, data-processing equipment, premises and equipment, contracts, reagents (water), reference substances and reference materials, calibration, verification of performance and qualification of equipment, instruments and other devices, analytical worksheet, evaluation of test results, personnel, and validation of analytical procedures. The study indicates that gaps are attributed to differences between the standards of Chinese Accreditation Standards and WHO-GPPQCL. Copyright © 2017 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.
Generic Verification Protocol for Verification of Online Turbidimeters
This protocol provides generic procedures for implementing a verification test for the performance of online turbidimeters. The verification tests described in this document will be conducted under the Environmental Technology Verification (ETV) Program. Verification tests will...
Corrigan, Damion K; Cauchi, Michael; Piletsky, Sergey; Mccrossen, Sean
2009-01-01
Cleaning verification is the process by which pharmaceutical manufacturing equipment is determined as sufficiently clean to allow manufacture to continue. Surface-enhanced Raman spectroscopy (SERS) is a very sensitive spectroscopic technique capable of detection at levels appropriate for cleaning verification. In this paper, commercially available Klarite SERS substrates were employed in order to obtain the necessary enhancement of signal for the identification of chemical species at concentrations of 1 to 10 ng/cm2, which are relevant to cleaning verification. The SERS approach was combined with principal component analysis in the identification of drug compounds recovered from a contaminated steel surface.
Z-2 Architecture Description and Requirements Verification Results
NASA Technical Reports Server (NTRS)
Graziosi, Dave; Jones, Bobby; Ferl, Jinny; Scarborough, Steve; Hewes, Linda; Ross, Amy; Rhodes, Richard
2016-01-01
The Z-2 Prototype Planetary Extravehicular Space Suit Assembly is a continuation of NASA's Z series of spacesuits. The Z-2 is another step in NASA's technology development roadmap leading to human exploration of the Martian surface. The suit was designed for maximum mobility at 8.3 psid, reduced mass, and to have high fidelity life support interfaces. As Z-2 will be man-tested at full vacuum in NASA JSC's Chamber B, it was manufactured as Class II, making it the most flight-like planetary walking suit produced to date. The Z-2 suit architecture is an evolution of previous EVA suits, namely the ISS EMU, Mark III, Rear Entry I-Suit and Z-1 spacesuits. The suit is a hybrid hard and soft multi-bearing, rear entry spacesuit. The hard upper torso (HUT) is an all-composite structure and includes a 2-bearing rolling convolute shoulder with Vernier sizing mechanism, removable suit port interface plate (SIP), elliptical hemispherical helmet and self-don/doff shoulder harness. The hatch is a hybrid aluminum and composite construction with Apollo style gas connectors, custom water pass-thru, removable hatch cage and interfaces to primary and auxiliary life support feed water bags. The suit includes Z-1 style lower arms with cam brackets for Vernier sizing and government furnished equipment (GFE) Phase VI gloves. The lower torso includes a telescopic waist sizing system, waist bearing, rolling convolute waist joint, hard brief, 2 bearing soft hip thigh, Z-1 style legs with ISS EMU style cam brackets for sizing, and conformal walking boots with ankle bearings. The Z-2 Requirements Verification Plan includes the verification of more than 200 individual requirements. The verification methods include test, analysis, inspection, demonstration or a combination of methods. Examples of unmanned requirements include suit leakage, proof pressure testing, operational life, mass, isometric man-loads, sizing adjustment ranges, internal and external interfaces such as in-suit drink bag, partial pressure relief valve, purge valve, donning stand and ISS Body Restraint Tether (BRT). Examples of manned requirements include verification of anthropometric range, suit self-don/doff, secondary suit exit method, donning stand self-ingress/egress and manned mobility covering eight functional tasks. The eight functional tasks include kneeling with object pick-up, standing toe touch, cross-body reach, walking, reach to the SIP and helmet visor. This paper will provide an overview of the Z-2 design. Z-2 requirements verification testing was performed with NASA at the ILC Houston test facility. This paper will also discuss pre-delivery manned and unmanned test results as well as analysis performed in support of requirements verification.
NASA Technical Reports Server (NTRS)
Drury, Michael; Becker, Neil; Bos, Brent; Davila, Pamela; Frey, Bradley; Hylan, Jason; Marsh, James; McGuffey, Douglas; Novak, Maria; Ohl, Raymond;
2007-01-01
The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approx.40K). The JWST Observatory architecture includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The SIs and Guider are mounted to a composite metering structure with outer dimensions of 2.1x2.2x1.9m. The SI and Guider units are integrated to the ISIM structure and optically tested at NASA/Goddard Space Flight Center as an instrument suite using a high-fidelity, cryogenic JWST telescope simulator that features a 1.5m diameter powered mirror. The SIs are integrated and aligned to the structure under ambient, clean room conditions. SI performance, including focus, pupil shear and wavefront error, is evaluated at the operating temperature. We present an overview of the ISIM integration within the context of Observatory-level construction. We describe the integration and verification plan for the ISIM element, including an overview of our incremental verification approach, ambient mechanical integration and test plans and optical alignment and cryogenic test plans. We describe key ground support equipment and facilities.
Patiño-Marín, N; Loyola-Rodríguez, J P; Tovar-Reyes, L F
2001-01-01
To assess the utilization of sterilizing equipment used by dentists, and verification of sterilization using biological indicators. A cross-sectional study was conducted in 1999-2000, among 130 (65%) dentists having sterilizing equipment, at Facultad de Estomatología, Universidad Autónoma de San Luis Potosí and Colegio Dental Potosino. Biological indicators for sterilization containing Bacillus subtilis and Bacillus stearothermophilus were used. Thirty autoclaves and 100 dry-heat sterilizers were evaluated: 23 (17.7%) of them showed bacterial growth. Twenty-one (16.1%) dentists already were using biological indicators to verify their sterilizing equipment. Both sterilization methods were found to allow bacterial growth with similar frequencies (p = > 0.66). Few dentists verify the quality of sterilization process through biological indicators; bacterial growth and failure of sterilization were evidenced.
THE ETV P2 INNOVATIVE COATINGS AND COATING EQUIPMENT PROGRAM--AN UPDATE
The paper focuses on the Pollution Prevention (P2), Recycling, and Waste Treatment Systems Center of the EPA's Environmental Technology Verification (ETV) Program and, specifically, the P2 Innovating Coatings and Coating Equipment Program (CCEP) housed within the Center. The focu...
NASA Technical Reports Server (NTRS)
2012-01-01
One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to protect our personnel from injury and our equipment from damage. The purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Z1 Suit Port Test in Chamber B located in building 32, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments, and activities while interfacing with facility test systems, equipment, and hardware. The goal of this hazard analysis is to identify all hazards that have the potential to harm personnel and/or damage facility equipment, flight hardware, property, or harm the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, JSC Safety and Health Handbook.
Micromechanics of composite laminate compression failure
NASA Technical Reports Server (NTRS)
Guynn, E. Gail; Bradley, Walter L.
1986-01-01
The Dugdale analysis for metals loaded in tension was adapted to model the failure of notched composite laminates loaded in compression. Compression testing details, MTS alignment verification, and equipment needs were resolved. Thus far, only 2 ductile material systems, HST7 and F155, were selected for study. A Wild M8 Zoom Stereomicroscope and necessary attachments for video taping and 35 mm pictures were purchased. Currently, this compression test system is fully operational. A specimen is loaded in compression, and load vs shear-crippling zone size is monitored and recorded. Data from initial compression tests indicate that the Dugdale model does not accurately predict the load vs damage zone size relationship of notched composite specimens loaded in compression.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the Shuttle Landing Facility, cranes help offload the Italian Space Agency's Multi-Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane. The third of three for the International Space Station, the module will be moved on a transporter to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
NASA Astrophysics Data System (ADS)
Hart, Darren; Pearce, Nathan; Starovoit, Yuri; Guralp, Cansun
2014-05-01
Since the Comprehensive Nuclear-Test-Ban Treaty was opened for signature in 1996, nearly 80% of the network has been certified as operational, and those stations are sending data to the International Data Centre (IDC) in Vienna. Several International Monitoring System (IMS) monitoring facilities have been in operation for close to 15 years, and several certified stations are facing equipment obsolescence issues. The search for engineering solutions to replace obsolete hardware components is guided by two primary goals: 1) be compliant with IMS minimum technical requirements and 2) be able to be integrated with the existing system. To reduce the development and verification time necessary to address obsolescence in equipment, the PTS has requested the preproduction testing of the recently revised Guralp CMG-DM24AM digitizer. Performing preproduction testing has helped in identifying issues, which Guralp Systems has resolved. In our poster, we will review the reasons for the digitizer updates, present results of the preproduction testing of the Guralp digitizer, and comment on the value this process has provided to the IMS operation.
Automatic Methods and Tools for the Verification of Real Time Systems
1997-11-30
We developed formal methods and tools for the verification of real - time systems . This was accomplished by extending techniques, based on automata...embedded real - time systems , we introduced hybrid automata, which equip traditional discrete automata with real-numbered clock variables and continuous... real - time systems , and we identified the exact boundary between decidability and undecidability of real-time reasoning.
Cleanup Verification Package for the 618-2 Burial Ground
DOE Office of Scientific and Technical Information (OSTI.GOV)
W. S. Thompson
2006-12-28
This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities.
NASA Technical Reports Server (NTRS)
1976-01-01
The performance, design, verification and operational requirements for Labcraft equipment and Labcraft integrated payloads are described. The requirements are based on the current definition of Spacelab and Space Transportation System equipment and the constraints associated with their use.
Hazard Analysis for Building 34 Vacuum Glove Box Assembly
NASA Technical Reports Server (NTRS)
Meginnis, Ian
2014-01-01
One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to prevent injury to personnel, and to prevent damage to facilities and equipment. The primary purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Building 34 Vacuum Glove Box Assembly, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments and activities while interfacing with facility test systems, equipment and hardware. In fulfillment of the stated purposes, the goal of this hazard analysis is to identify all hazards that have the potential to harm personnel, damage the facility or its test systems or equipment, test articles, Government or personal property, or the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in Appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, "JSC Safety and Health Handbook" and JSC 17773 Rev D "Instructions for Preparation of Hazard Analysis for JSC Ground Operations".
NASA Technical Reports Server (NTRS)
Williamson, Steve; Aman, Bob; Aurigema, Andrew; Melendez, Orlando
1999-01-01
The Wiltech Component Cleaning & Refurbishment Facility (WT-CCRF) at NASA Kennedy Space Center performs precision cleaning on approximately 200,000 metallic and non metallic components every year. WT-CCRF has developed a CFC elimination plan consisting of aqueous cleaning and verification and an economical dual solvent strategy for alternative solvent solution. Aqueous Verification Methodologies were implemented two years ago on a variety of Ground Support Equipment (GSE) components and sampling equipment. Today, 50% of the current workload is verified using aqueous methods and 90% of the total workload is degreased aqueously using, Zonyl and Brulin surfactants in ultrasonic baths. An additional estimated 20% solvent savings could be achieved if the proposed expanded use of aqueous methods are approved. Aqueous cleaning has shown to be effective, environmentally friendly and economical (i.e.. cost of materials, equipment, facilities and labor).
Staged-Fault Testing of Distance Protection Relay Settings
NASA Astrophysics Data System (ADS)
Havelka, J.; Malarić, R.; Frlan, K.
2012-01-01
In order to analyze the operation of the protection system during induced fault testing in the Croatian power system, a simulation using the CAPE software has been performed. The CAPE software (Computer-Aided Protection Engineering) is expert software intended primarily for relay protection engineers, which calculates current and voltage values during faults in the power system, so that relay protection devices can be properly set up. Once the accuracy of the simulation model had been confirmed, a series of simulations were performed in order to obtain the optimal fault location to test the protection system. The simulation results were used to specify the test sequence definitions for the end-to-end relay testing using advanced testing equipment with GPS synchronization for secondary injection in protection schemes based on communication. The objective of the end-to-end testing was to perform field validation of the protection settings, including verification of the circuit breaker operation, telecommunication channel time and the effectiveness of the relay algorithms. Once the end-to-end secondary injection testing had been completed, the induced fault testing was performed with three-end lines loaded and in service. This paper describes and analyses the test procedure, consisting of CAPE simulations, end-to-end test with advanced secondary equipment and staged-fault test of a three-end power line in the Croatian transmission system.
EVA Design, Verification, and On-Orbit Operations Support Using Worksite Analysis
NASA Technical Reports Server (NTRS)
Hagale, Thomas J.; Price, Larry R.
2000-01-01
The International Space Station (ISS) design is a very large and complex orbiting structure with thousands of Extravehicular Activity (EVA) worksites. These worksites are used to assemble and maintain the ISS. The challenge facing EVA designers was how to design, verify, and operationally support such a large number of worksites within cost and schedule. This has been solved through the practical use of computer aided design (CAD) graphical techniques that have been developed and used with a high degree of success over the past decade. The EVA design process allows analysts to work concurrently with hardware designers so that EVA equipment can be incorporated and structures configured to allow for EVA access and manipulation. Compliance with EVA requirements is strictly enforced during the design process. These techniques and procedures, coupled with neutral buoyancy underwater testing, have proven most valuable in the development, verification, and on-orbit support of planned or contingency EVA worksites.
Test Telemetry And Command System (TTACS)
NASA Technical Reports Server (NTRS)
Fogel, Alvin J.
1994-01-01
The Jet Propulsion Laboratory has developed a multimission Test Telemetry and Command System (TTACS) which provides a multimission telemetry and command data system in a spacecraft test environment. TTACS reuses, in the spacecraft test environment, components of the same data system used for flight operations; no new software is developed for the spacecraft test environment. Additionally, the TTACS is transportable to any spacecraft test site, including the launch site. The TTACS is currently operational in the Galileo spacecraft testbed; it is also being provided to support the Cassini and Mars Surveyor Program projects. Minimal personnel data system training is required in the transition from pre-launch spacecraft test to post-launch flight operations since test personnel are already familiar with the data system's operation. Additionally, data system components, e.g. data display, can be reused to support spacecraft software development; and the same data system components will again be reused during the spacecraft integration and system test phases. TTACS usage also results in early availability of spacecraft data to data system development and, as a result, early data system development feedback to spacecraft system developers. The TTACS consists of a multimission spacecraft support equipment interface and components of the multimission telemetry and command software adapted for a specific project. The TTACS interfaces to the spacecraft, e.g., Command Data System (CDS), support equipment. The TTACS telemetry interface to the CDS support equipment performs serial (RS-422)-to-ethernet conversion at rates between 1 bps and 1 mbps, telemetry data blocking and header generation, guaranteed data transmission to the telemetry data system, and graphical downlink routing summary and control. The TTACS command interface to the CDS support equipment is nominally a command file transferred in non-real-time via ethernet. The CDS support equipment is responsible for metering the commands to the CDS; additionally for Galileo, TTACS includes a real-time-interface to the CDS support equipment. The TTACS provides the basic functionality of the multimission telemetry and command data system used during flight operations. TTACS telemetry capabilities include frame synchronization, Reed-Solomon decoding, packet extraction and channelization, and data storage/query. Multimission data display capabilities are also available. TTACS command capabilities include command generation verification, and storage.
Construction quality assurance report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roscha, V.
1994-09-08
This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Constructionmore » Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.« less
Analog Video Authentication and Seal Verification Equipment Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory Lancaster
Under contract to the US Department of Energy in support of arms control treaty verification activities, the Savannah River National Laboratory in conjunction with the Pacific Northwest National Laboratory, the Idaho National Laboratory and Milagro Consulting, LLC developed equipment for use within a chain of custody regime. This paper discussed two specific devices, the Authentication Through the Lens (ATL) analog video authentication system and a photographic multi-seal reader. Both of these devices have been demonstrated in a field trial, and the experience gained throughout will also be discussed. Typically, cryptographic methods are used to prove the authenticity of digital imagesmore » and video used in arms control chain of custody applications. However, in some applications analog cameras are used. Since cryptographic authentication methods will not work on analog video streams, a simple method of authenticating analog video was developed and tested. A photographic multi-seal reader was developed to image different types of visual unique identifiers for use in chain of custody and authentication activities. This seal reader is unique in its ability to image various types of seals including the Cobra Seal, Reflective Particle Tags, and adhesive seals. Flicker comparison is used to compare before and after images collected with the seal reader in order to detect tampering and verify the integrity of the seal.« less
[Validation and verfication of microbiology methods].
Camaró-Sala, María Luisa; Martínez-García, Rosana; Olmos-Martínez, Piedad; Catalá-Cuenca, Vicente; Ocete-Mochón, María Dolores; Gimeno-Cardona, Concepción
2015-01-01
Clinical microbiologists should ensure, to the maximum level allowed by the scientific and technical development, the reliability of the results. This implies that, in addition to meeting the technical criteria to ensure their validity, they must be performed with a number of conditions that allows comparable results to be obtained, regardless of the laboratory that performs the test. In this sense, the use of recognized and accepted reference methodsis the most effective tool for these guarantees. The activities related to verification and validation of analytical methods has become very important, as there is continuous development, as well as updating techniques and increasingly complex analytical equipment, and an interest of professionals to ensure quality processes and results. The definitions of validation and verification are described, along with the different types of validation/verification, and the types of methods, and the level of validation necessary depending on the degree of standardization. The situations in which validation/verification is mandatory and/or recommended is discussed, including those particularly related to validation in Microbiology. It stresses the importance of promoting the use of reference strains as controls in Microbiology and the use of standard controls, as well as the importance of participation in External Quality Assessment programs to demonstrate technical competence. The emphasis is on how to calculate some of the parameters required for validation/verification, such as the accuracy and precision. The development of these concepts can be found in the microbiological process SEIMC number 48: «Validation and verification of microbiological methods» www.seimc.org/protocols/microbiology. Copyright © 2013 Elsevier España, S.L.U. y Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
...). Replacement of heating, ventilation and air conditioning (HVAC) equipment with Energy Star qualified heating, HVAC equipment. (3 points). Replacement of windows and doors with Energy Star qualified windows and... the third-party program's rating and verification systems. (2 points). Dated: August 11, 2011. Robert...
46 CFR 61.40-3 - Design verification testing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Design verification testing. 61.40-3 Section 61.40-3... INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...
Independent Validation and Verification of automated information systems in the Department of Energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunteman, W.J.; Caldwell, R.
1994-07-01
The Department of Energy (DOE) has established an Independent Validation and Verification (IV&V) program for all classified automated information systems (AIS) operating in compartmented or multi-level modes. The IV&V program was established in DOE Order 5639.6A and described in the manual associated with the Order. This paper describes the DOE IV&V program, the IV&V process and activities, the expected benefits from an IV&V, and the criteria and methodologies used during an IV&V. The first IV&V under this program was conducted on the Integrated Computing Network (ICN) at Los Alamos National Laboratory and several lessons learned are presented. The DOE IV&Vmore » program is based on the following definitions. An IV&V is defined as the use of expertise from outside an AIS organization to conduct validation and verification studies on a classified AIS. Validation is defined as the process of applying the specialized security test and evaluation procedures, tools, and equipment needed to establish acceptance for joint usage of an AIS by one or more departments or agencies and their contractors. Verification is the process of comparing two levels of an AIS specification for proper correspondence (e.g., security policy model with top-level specifications, top-level specifications with source code, or source code with object code).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willis, David J.; Kron, Tomas; Hubbard, Patricia
2009-01-01
The kidneys are dose-limiting organs in abdominal radiotherapy. Kilovoltage (kV) radiographs can be acquired using on-board imager (OBI)-equipped linear accelerators with better soft tissue contrast and lower radiation doses than conventional portal imaging. A feasibility study was conducted to test the suitability of anterior-posterior (AP) non-contrast kV radiographs acquired at treatment time for online kidney position verification. Anthropomorphic phantoms were used to evaluate image quality and radiation dose. Institutional Review Board approval was given for a pilot study that enrolled 5 adults and 5 children. Customized digitally reconstructed radiographs (DRRs) were generated to provide a priori information on kidney shapemore » and position. Radiotherapy treatment staff performed online evaluation of kidney visibility on OBI radiographs. Kidney dose measured in a pediatric anthropomorphic phantom was 0.1 cGy for kV imaging and 1.7 cGy for MV imaging. Kidneys were rated as well visualized in 60% of patients (90% confidence interval, 34-81%). The likelihood of visualization appears to be influenced by the relative AP separation of the abdomen and kidneys, the axial profile of the kidneys, and their relative contrast with surrounding structures. Online verification of kidney position using AP non-contrast kV radiographs on an OBI-equipped linear accelerator appears feasible for patients with suitable abdominal anatomy. Kidney position information provided is limited to 2-dimensional 'snapshots,' but this is adequate in some clinical situations and potentially advantageous in respiratory-correlated treatments. Successful clinical implementation requires customized partial DRRs, appropriate imaging parameters, and credentialing of treatment staff.« less
An Airbus arrives at KSC with third MPLM
NASA Technical Reports Server (NTRS)
2001-01-01
An Airbus '''Beluga''' air cargo plane, The Super Transporter, lands at KSC's Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
An Airbus arrives at KSC with third MPLM
NASA Technical Reports Server (NTRS)
2001-01-01
An Airbus '''Beluga''' air cargo plane, The Super Transporter, arrives at KSC's Shuttle Landing Facility from the factory of Alenia Aerospazio in Turin, Italy. Its cargo is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
Guidance and Control Software Project Data - Volume 3: Verification Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.
NASA Technical Reports Server (NTRS)
DiPirro, M.; Homan, J.; Havey, K.; Ousley, W.
2017-01-01
The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.
NASA Technical Reports Server (NTRS)
Mitchell, Mark A.; Lowrey, Nikki M.
2015-01-01
Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon-225 (HCFC-225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC-225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both the NASA Rocket Propulsion Test Program and the Defense Logistics Agency - Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC-225 that is both an effective cleaner and safe for use with oxygen systems. Candidate solvents were selected and a test plan was developed following the guidelines of ASTM G127, Standard Guide for the Selection of Cleaning Agents for Oxygen Systems. Solvents were evaluated for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Two solvents were determined to be acceptable for cleaning oxygen systems and one was chosen for implementation at NASA's rocket propulsion test facilities. The test program and results are summarized. This project also demonstrated the benefits of cross-agency collaboration in a time of limited resources.
PANIC: A General-purpose Panoramic Near-infrared Camera for the Calar Alto Observatory
NASA Astrophysics Data System (ADS)
Cárdenas Vázquez, M.-C.; Dorner, B.; Huber, A.; Sánchez-Blanco, E.; Alter, M.; Rodríguez Gómez, J. F.; Bizenberger, P.; Naranjo, V.; Ibáñez Mengual, J.-M.; Panduro, J.; García Segura, A. J.; Mall, U.; Fernández, M.; Laun, W.; Ferro Rodríguez, I. M.; Helmling, J.; Terrón, V.; Meisenheimer, K.; Fried, J. W.; Mathar, R. J.; Baumeister, H.; Rohloff, R.-R.; Storz, C.; Verdes-Montenegro, L.; Bouy, H.; Ubierna, M.; Fopp, P.; Funke, B.
2018-02-01
PANIC7 is the new PAnoramic Near-Infrared Camera for Calar Alto and is a project jointly developed by the MPIA in Heidelberg, Germany, and the IAA in Granada, Spain, for the German-Spanish Astronomical Center at Calar Alto Observatory (CAHA; Almería, Spain). This new instrument works with the 2.2 m and 3.5 m CAHA telescopes covering a field of view of 30 × 30 arcmin and 15 × 15 arcmin, respectively, with a sampling of 4096 × 4096 pixels. It is designed for the spectral bands from Z to K S , and can also be equipped with narrowband filters. The instrument was delivered to the observatory in 2014 October and was commissioned at both telescopes between 2014 November and 2015 June. Science verification at the 2.2 m telescope was carried out during the second semester of 2015 and the instrument is now at full operation. We describe the design, assembly, integration, and verification process, the final laboratory tests and the PANIC instrument performance. We also present first-light data obtained during the commissioning and preliminary results of the scientific verification. The final optical model and the theoretical performance of the camera were updated according to the as-built data. The laboratory tests were made with a star simulator. Finally, the commissioning phase was done at both telescopes to validate the camera real performance on sky. The final laboratory test confirmed the expected camera performances, complying with the scientific requirements. The commissioning phase on sky has been accomplished.
Protoflight photovoltaic power module system-level tests in the space power facility
NASA Technical Reports Server (NTRS)
Rivera, Juan C.; Kirch, Luke A.
1989-01-01
Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: The protoflight vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF), are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations are presented.
Optomechanical design and testing of the VLT tertiary mirrors
NASA Astrophysics Data System (ADS)
Bollinger, Wolfgang; Juranek, Hans J.; Schulte, Stefan; May, K.; Michel, Alain
2000-07-01
The Tertiary Mirrors for the ESO Very Large Telescope project consist of four optical flats (elliptical, 890 X 1260 mm2). The achieved opto-mechanical design is challenging since it provides high optical overall quality combined with high stiffness (70 Hz Eigenfrequency) and low mass (total mass of 180 kg for the complete unit). Schott (Mainz, Germany) produces the lightweight Zerodur blanks. Carl Zeiss has designed and manufactured the mirror and its support cell. Last not least it became necessary to install the biggest testing equipment for flats in Europe to guarantee for a scientifically correct verification of the quality of the complete unit. All four mirrors have been delivered to ESO.
End-to-end test of the electron-proton spectrometer
NASA Technical Reports Server (NTRS)
Cash, B. L.
1972-01-01
A series of end-to-end tests were performed to demonstrate the proper functioning of the complete Electron-Proton Spectrometer (EPS). The purpose of the tests was to provide experimental verification of the design and to provide a complete functional performance check of the instrument from the excitation of the sensors to and including the data processor and equipment test set. Each of the channels of the EPS was exposed to a calibrated beam of energetic particles, and counts were accumulated for a predetermined period of time for each of several energies. The counts were related to the known flux of particles to give a monodirectional response function for each channel. The measured response function of the test unit was compared to the response function determined for the calibration sensors from the data taken from the calibration program.
Model-Based Verification and Validation of Spacecraft Avionics
NASA Technical Reports Server (NTRS)
Khan, M. Omair; Sievers, Michael; Standley, Shaun
2012-01-01
Verification and Validation (V&V) at JPL is traditionally performed on flight or flight-like hardware running flight software. For some time, the complexity of avionics has increased exponentially while the time allocated for system integration and associated V&V testing has remained fixed. There is an increasing need to perform comprehensive system level V&V using modeling and simulation, and to use scarce hardware testing time to validate models; the norm for thermal and structural V&V for some time. Our approach extends model-based V&V to electronics and software through functional and structural models implemented in SysML. We develop component models of electronics and software that are validated by comparison with test results from actual equipment. The models are then simulated enabling a more complete set of test cases than possible on flight hardware. SysML simulations provide access and control of internal nodes that may not be available in physical systems. This is particularly helpful in testing fault protection behaviors when injecting faults is either not possible or potentially damaging to the hardware. We can also model both hardware and software behaviors in SysML, which allows us to simulate hardware and software interactions. With an integrated model and simulation capability we can evaluate the hardware and software interactions and identify problems sooner. The primary missing piece is validating SysML model correctness against hardware; this experiment demonstrated such an approach is possible.
Automatic Methods and Tools for the Verification of Real Time Systems
1997-07-31
real - time systems . This was accomplished by extending techniques, based on automata theory and temporal logic, that have been successful for the verification of time-independent reactive systems. As system specification lanmaage for embedded real - time systems , we introduced hybrid automata, which equip traditional discrete automata with real-numbered clock variables and continuous environment variables. As requirements specification languages, we introduced temporal logics with clock variables for expressing timing constraints.
Annual verifications--a tick-box exercise?
Walker, Gwen; Williams, David
2014-09-01
With the onus on healthcare providers and their staff to protect patients against all elements of 'avoidable harm' perhaps never greater, Gwen Walker, a highly experienced infection prevention control nurse specialist, and David Williams, MD of Approved Air, who has 30 years' experience in validation and verification of ventilation and ultraclean ventilation systems, examine changing requirements for, and trends in, operating theatre ventilation. Validation and verification reporting on such vital HVAC equipment should not, they argue, merely be viewed as a 'tick-box exercise'; it should instead 'comprehensively inform key stakeholders, and ultimately form part of clinical governance, thus protecting those ultimately named responsible for organisation-wide safety at Trust board level'.
SLS Flight Software Testing: Using a Modified Agile Software Testing Approach
NASA Technical Reports Server (NTRS)
Bolton, Albanie T.
2016-01-01
NASA's Space Launch System (SLS) is an advanced launch vehicle for a new era of exploration beyond earth's orbit (BEO). The world's most powerful rocket, SLS, will launch crews of up to four astronauts in the agency's Orion spacecraft on missions to explore multiple deep-space destinations. Boeing is developing the SLS core stage, including the avionics that will control vehicle during flight. The core stage will be built at NASA's Michoud Assembly Facility (MAF) in New Orleans, LA using state-of-the-art manufacturing equipment. At the same time, the rocket's avionics computer software is being developed here at Marshall Space Flight Center in Huntsville, AL. At Marshall, the Flight and Ground Software division provides comprehensive engineering expertise for development of flight and ground software. Within that division, the Software Systems Engineering Branch's test and verification (T&V) team uses an agile test approach in testing and verification of software. The agile software test method opens the door for regular short sprint release cycles. The idea or basic premise behind the concept of agile software development and testing is that it is iterative and developed incrementally. Agile testing has an iterative development methodology where requirements and solutions evolve through collaboration between cross-functional teams. With testing and development done incrementally, this allows for increased features and enhanced value for releases. This value can be seen throughout the T&V team processes that are documented in various work instructions within the branch. The T&V team produces procedural test results at a higher rate, resolves issues found in software with designers at an earlier stage versus at a later release, and team members gain increased knowledge of the system architecture by interfacing with designers. SLS Flight Software teams want to continue uncovering better ways of developing software in an efficient and project beneficial manner. Through agile testing, there has been increased value through individuals and interactions over processes and tools, improved customer collaboration, and improved responsiveness to changes through controlled planning. The presentation will describe agile testing methodology as taken with the SLS FSW Test and Verification team at Marshall Space Flight Center.
An Airbus arrives at KSC with third MPLM
NASA Technical Reports Server (NTRS)
2001-01-01
An Airbus '''Beluga''' air cargo plane, The Super Transporter, taxis onto the parking apron at KSC's Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the Shuttle Landing Facility, workers in cherry pickers (right) help guide offloading of the Italian Space Agency's Multi-Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
2001-02-01
An Airbus “Beluga” air cargo plane, The Super Transporter, taxis onto the parking apron at KSC’s Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency’s Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo
NASA Technical Reports Server (NTRS)
Landano, M. R.; Easter, R. W.
1984-01-01
Aspects of Space Station automated systems testing and verification are discussed, taking into account several program requirements. It is found that these requirements lead to a number of issues of uncertainties which require study and resolution during the Space Station definition phase. Most, if not all, of the considered uncertainties have implications for the overall testing and verification strategy adopted by the Space Station Program. A description is given of the Galileo Orbiter fault protection design/verification approach. Attention is given to a mission description, an Orbiter description, the design approach and process, the fault protection design verification approach/process, and problems of 'stress' testing.
Qiao, Guixiu; Weiss, Brian A.
2016-01-01
Unexpected equipment downtime is a ‘pain point’ for manufacturers, especially in that this event usually translates to financial losses. To minimize this pain point, manufacturers are developing new health monitoring, diagnostic, prognostic, and maintenance (collectively known as prognostics and health management (PHM)) techniques to advance the state-of-the-art in their maintenance strategies. The manufacturing community has a wide-range of needs with respect to the advancement and integration of PHM technologies to enhance manufacturing robotic system capabilities. Numerous researchers, including personnel from the National Institute of Standards and Technology (NIST), have identified a broad landscape of barriers and challenges to advancing PHM technologies. One such challenge is the verification and validation of PHM technology through the development of performance metrics, test methods, reference datasets, and supporting tools. Besides documenting and presenting the research landscape, NIST personnel are actively researching PHM for robotics to promote the development of innovative sensing technology and prognostic decision algorithms and to produce a positional accuracy test method that emphasizes the identification of static and dynamic positional accuracy. The test method development will provide manufacturers with a methodology that will allow them to quickly assess the positional health of their robot systems along with supporting the verification and validation of PHM techniques for the robot system. PMID:28058172
Qiao, Guixiu; Weiss, Brian A
2016-01-01
Unexpected equipment downtime is a 'pain point' for manufacturers, especially in that this event usually translates to financial losses. To minimize this pain point, manufacturers are developing new health monitoring, diagnostic, prognostic, and maintenance (collectively known as prognostics and health management (PHM)) techniques to advance the state-of-the-art in their maintenance strategies. The manufacturing community has a wide-range of needs with respect to the advancement and integration of PHM technologies to enhance manufacturing robotic system capabilities. Numerous researchers, including personnel from the National Institute of Standards and Technology (NIST), have identified a broad landscape of barriers and challenges to advancing PHM technologies. One such challenge is the verification and validation of PHM technology through the development of performance metrics, test methods, reference datasets, and supporting tools. Besides documenting and presenting the research landscape, NIST personnel are actively researching PHM for robotics to promote the development of innovative sensing technology and prognostic decision algorithms and to produce a positional accuracy test method that emphasizes the identification of static and dynamic positional accuracy. The test method development will provide manufacturers with a methodology that will allow them to quickly assess the positional health of their robot systems along with supporting the verification and validation of PHM techniques for the robot system.
46 CFR 61.40-3 - Design verification testing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...
40 CFR 1066.420 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Pre-test verification procedures and pre-test data collection. 1066.420 Section 1066.420 Protection of Environment ENVIRONMENTAL PROTECTION... Test § 1066.420 Pre-test verification procedures and pre-test data collection. (a) Follow the...
40 CFR 1066.420 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Pre-test verification procedures and pre-test data collection. 1066.420 Section 1066.420 Protection of Environment ENVIRONMENTAL PROTECTION... Test § 1066.420 Pre-test verification procedures and pre-test data collection. (a) Follow the...
ENVIRONMENTAL TECHNOLOGY VERIFICATION TEST PROTOCOL, GENERAL VENTILATION FILTERS
The Environmental Technology Verification Test Protocol, General Ventilation Filters provides guidance for verification tests.
Reference is made in the protocol to the ASHRAE 52.2P "Method of Testing General Ventilation Air-cleaning Devices for Removal Efficiency by P...
NASA Astrophysics Data System (ADS)
Herbuś, K.; Ociepka, P.
2017-08-01
In the work is analysed a sequential control system of a machine for separating and grouping work pieces for processing. Whereas, the area of the considered problem is related with verification of operation of an actuator system of an electro-pneumatic control system equipped with a PLC controller. Wherein to verification is subjected the way of operation of actuators in view of logic relationships assumed in the control system. The actuators of the considered control system were three drives of linear motion (pneumatic cylinders). And the logical structure of the system of operation of the control system is based on the signals flow graph. The tested logical structure of operation of the electro-pneumatic control system was implemented in the Automation Studio software of B&R company. This software is used to create programs for the PLC controllers. Next, in the FluidSIM software was created the model of the actuator system of the control system of a machine. To verify the created program for the PLC controller, simulating the operation of the created model, it was utilized the approach of integration these two programs using the tool for data exchange in the form of the OPC server.
The Air Pollution Control Technology Verification Center has selected general ventilation air cleaners as a technology area. The Generic Verification Protocol for Biological and Aerosol Testing of General Ventilation Air Cleaners is on the Environmental Technology Verification we...
Terminal configured vehicle program: Test facilities guide
NASA Technical Reports Server (NTRS)
1980-01-01
The terminal configured vehicle (TCV) program was established to conduct research and to develop and evaluate aircraft and flight management system technology concepts that will benefit conventional take off and landing operations in the terminal area. Emphasis is placed on the development of operating methods for the highly automated environment anticipated in the future. The program involves analyses, simulation, and flight experiments. Flight experiments are conducted using a modified Boeing 737 airplane equipped with highly flexible display and control equipment and an aft flight deck for research purposes. The experimental systems of the Boeing 737 are described including the flight control computer systems, the navigation/guidance system, the control and command panel, and the electronic display system. The ground based facilities used in the program are described including the visual motion simulator, the fixed base simulator, the verification and validation laboratory, and the radio frequency anechoic facility.
Results of the life sciences DSOs conducted aboard the space shuttle 1981-1986
NASA Technical Reports Server (NTRS)
Bungo, Michael W.; Bagian, Tandi M.; Bowman, Mark A.; Levitan, Barry M.
1987-01-01
Results are presented for a number of life sciences investigations sponsored by the Space Biomedical Research Institute at the NASA Lyndon B. Johnson Space Center and conducted as Detailed Supplementary Objectives (DSOs) on Space Shuttle flights between 1981 and 1986. An introduction and a description of the DSO program are followed by summary reports on the investigations. Reports are grouped into the following disciplines: Biochemistry and Pharmacology, Cardiovascular Effects and Fluid Shifts, Equipment Testing and Experiment Verification, Microbiology, Space Motion Sickness, and Vision. In the appendix, the status of every medical/life science DSO is presented in graphical form, which enables the flight history, the number of subjects tested, and the experiment results to be reviewed at a glance.
40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...
40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...
40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) For...
40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...
40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION... Specified Duty Cycles § 1065.520 Pre-test verification procedures and pre-test data collection. (a) If your...
33 CFR 155.790 - Deck lighting.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Procedures, Equipment, and Records § 155.790 Deck lighting. (a) A self-propelled vessel with a capacity of... inadequate the OCMI or COTP may require verification by instrument of the levels of illumination. On a...
Me, My Self, and Eye: The Teacher as Producer.
ERIC Educational Resources Information Center
Journal of Special Education Technology, 1982
1982-01-01
A video production model designed to help teachers produce individualized instructional video/programs for severely handicapped students is described. The project's development, equipment design, and field verification approaches are reviewed. (CL)
The Danish Environmental Technology Verification program (DANETV) Water Test Centre operated by DHI, is supported by the Danish Ministry for Science, Technology and Innovation. DANETV, the United States Environmental Protection Agency Environmental Technology Verification Progra...
Test/QA Plan for Verification of Leak Detection and Repair Technologies
The purpose of the leak detection and repair (LDAR) test and quality assurance plan is to specify procedures for a verification test applicable to commercial LDAR technologies. The purpose of the verification test is to evaluate the performance of participating technologies in b...
Test/QA Plan (TQAP) for Verification of Semi-Continuous Ambient Air Monitoring Systems
The purpose of the semi-continuous ambient air monitoring technology (or MARGA) test and quality assurance plan is to specify procedures for a verification test applicable to commercial semi-continuous ambient air monitoring technologies. The purpose of the verification test is ...
Firefly: an optical lithographic system for the fabrication of holographic security labels
NASA Astrophysics Data System (ADS)
Calderón, Jorge; Rincón, Oscar; Amézquita, Ricardo; Pulido, Iván.; Amézquita, Sebastián.; Bernal, Andrés.; Romero, Luis; Agudelo, Viviana
2016-03-01
This paper introduces Firefly, an optical lithography origination system that has been developed to produce holographic masters of high quality. This mask-less lithography system has a resolution of 418 nm half-pitch, and generates holographic masters with the optical characteristics required for security applications of level 1 (visual verification), level 2 (pocket reader verification) and level 3 (forensic verification). The holographic master constitutes the main core of the manufacturing process of security holographic labels used for the authentication of products and documents worldwide. Additionally, the Firefly is equipped with a software tool that allows for the hologram design from graphic formats stored in bitmaps. The software is capable of generating and configuring basic optical effects such as animation and color, as well as effects of high complexity such as Fresnel lenses, engraves and encrypted images, among others. The Firefly technology gathers together optical lithography, digital image processing and the most advanced control systems, making possible a competitive equipment that challenges the best technologies in the industry of holographic generation around the world. In this paper, a general description of the origination system is provided as well as some examples of its capabilities.
This verification test was conducted according to procedures specifiedin the Test/QA Planfor Verification of Enzyme-Linked Immunosorbent Assay (ELISA) Test Kis for the Quantitative Determination of Endocrine Disrupting Compounds (EDCs) in Aqueous Phase Samples. Deviations to the...
The purpose of the cavity ringdown spectroscopy (CRDS) technology test and quality assurance plan is to specify procedures for a verification test applicable to commercial cavity ringdown spectroscopy technologies. The purpose of the verification test is to evaluate the performa...
40 CFR 86.1849-01 - Right of entry.
Code of Federal Regulations, 2011 CFR
2011-07-01
... entity who conducts or causes to be conducted in-use verification or in-use confirmatory testing under... where any such certification or in-use verification or in-use confirmatory testing or any procedures or... test vehicle used for certification, in-use verification or in-use confirmatory testing which is being...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
...-AQ06 Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing... correct certain portions of the Protocol Gas Verification Program and Minimum Competency Requirements for... final rule that amends the Agency's Protocol Gas Verification Program (PGVP) and the minimum competency...
Verification test report on a solar heating and hot water system
NASA Technical Reports Server (NTRS)
1978-01-01
Information is provided on the development, qualification and acceptance verification of commercial solar heating and hot water systems and components. The verification includes the performances, the efficiences and the various methods used, such as similarity, analysis, inspection, test, etc., that are applicable to satisfying the verification requirements.
Design of lightning protection for a full-authority digital engine control
NASA Technical Reports Server (NTRS)
Dargi, M.; Rupke, E.; Wiles, K.
1991-01-01
The steps and procedures are described which are necessary to achieve a successful lightning-protection design for a state-of-the-art Full-Authority Digital Engine Control (FADEC) system. The engine and control systems used as examples are fictional, but the design and verification methods are real. Topics discussed include: applicable airworthiness regulation, selection of equipment transient design and control levels for the engine/airframe and intra-engine segments of the system, the use of cable shields, terminal-protection devices and filter circuits in hardware protection design, and software approaches to minimize upset potential. Shield terminations, grounding, and bonding are also discussed, as are the important elements of certification and test plans, and the role of tests and analyses. Also included are examples of multiple-stroke and multiple-burst testing. A review of design pitfalls and challenges, and status of applicable test standards such as RTCA DO-160, Section 22, are presented.
Heave-pitch-roll analysis and testing of air cushion landing systems
NASA Technical Reports Server (NTRS)
Boghani, A. B.; Captain, K. M.; Wormley, D. N.
1978-01-01
The analytical tools (analysis and computer simulation) needed to explain and predict the dynamic operation of air cushion landing systems (ACLS) is described. The following tasks were performed: the development of improved analytical models for the fan and the trunk; formulation of a heave pitch roll analysis for the complete ACLS; development of a general purpose computer simulation to evaluate landing and taxi performance of an ACLS equipped aircraft; and the verification and refinement of the analysis by comparison with test data obtained through lab testing of a prototype cushion. Demonstration of simulation capabilities through typical landing and taxi simulation of an ACLS aircraft are given. Initial results show that fan dynamics have a major effect on system performance. Comparison with lab test data (zero forward speed) indicates that the analysis can predict most of the key static and dynamic parameters (pressure, deflection, acceleration, etc.) within a margin of a 10 to 25 percent.
Design for Verification: Enabling Verification of High Dependability Software-Intensive Systems
NASA Technical Reports Server (NTRS)
Mehlitz, Peter C.; Penix, John; Markosian, Lawrence Z.; Koga, Dennis (Technical Monitor)
2003-01-01
Strategies to achieve confidence that high-dependability applications are correctly implemented include testing and automated verification. Testing deals mainly with a limited number of expected execution paths. Verification usually attempts to deal with a larger number of possible execution paths. While the impact of architecture design on testing is well known, its impact on most verification methods is not as well understood. The Design for Verification approach considers verification from the application development perspective, in which system architecture is designed explicitly according to the application's key properties. The D4V-hypothesis is that the same general architecture and design principles that lead to good modularity, extensibility and complexity/functionality ratio can be adapted to overcome some of the constraints on verification tools, such as the production of hand-crafted models and the limits on dynamic and static analysis caused by state space explosion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marleau, Peter; Brubaker, Erik; Deland, Sharon M.
This report summarizes the discussion and conclusions reached during a table top exercise held at Sandia National Laboratories, Albuquerque on September 3, 2014 regarding a recently described approach for nuclear warhead verification based on the cryptographic concept of a zero-knowledge protocol (ZKP) presented in a recent paper authored by Glaser, Barak, and Goldston. A panel of Sandia National Laboratories researchers, whose expertise includes radiation instrumentation design and development, cryptography, and arms control verification implementation, jointly reviewed the paper and identified specific challenges to implementing the approach as well as some opportunities. It was noted that ZKP as used in cryptographymore » is a useful model for the arms control verification problem, but the direct analogy to arms control breaks down quickly. The ZKP methodology for warhead verification fits within the general class of template-based verification techniques, where a reference measurement is used to confirm that a given object is like another object that has already been accepted as a warhead by some other means. This can be a powerful verification approach, but requires independent means to trust the authenticity of the reference warhead - a standard that may be difficult to achieve, which the ZKP authors do not directly address. Despite some technical challenges, the concept of last-minute selection of the pre-loads and equipment could be a valuable component of a verification regime.« less
An Optimized Online Verification Imaging Procedure for External Beam Partial Breast Irradiation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willis, David J., E-mail: David.Willis@petermac.or; Royal Melbourne Institute of Technology University, Melbourne, Victoria; Kron, Tomas
2011-07-01
The purpose of this study was to evaluate the capabilities of a kilovoltage (kV) on-board imager (OBI)-equipped linear accelerator in the setting of on-line verification imaging for external-beam partial breast irradiation. Available imaging techniques were optimized and assessed for image quality using a modified anthropomorphic phantom. Imaging dose was also assessed. Imaging techniques were assessed for physical clearance between patient and treatment machine using a volunteer. Nonorthogonal kV image pairs were identified as optimal in terms of image quality, clearance, and dose. After institutional review board approval, this approach was used for 17 patients receiving accelerated partial breast irradiation. Imagingmore » was performed before every fraction verification with online correction of setup deviations >5 mm (total image sessions = 170). Treatment staff rated risk of collision and visibility of tumor bed surgical clips where present. Image session duration and detected setup deviations were recorded. For all cases, both image projections (n = 34) had low collision risk. Surgical clips were rated as well as visualized in all cases where they were present (n = 5). The average imaging session time was 6 min, 16 sec, and a reduction in duration was observed as staff became familiar with the technique. Setup deviations of up to 1.3 cm were detected before treatment and subsequently confirmed offline. Nonorthogonal kV image pairs allowed effective and efficient online verification for partial breast irradiation. It has yet to be tested in a multicenter study to determine whether it is dependent on skilled treatment staff.« less
The research of medical equipment on-line detection system based on Android smartphone
NASA Astrophysics Data System (ADS)
Jiang, Junjie; Dong, Xinyu; Zhang, Hongjie; Liu, Mengjun
2017-06-01
With the unceasing enhancement of medical level, the expanding scale of medical institutions, medical equipment as an important tool for disease diagnosis, treatment and prevention, used in all levels of medical institutions. The quality and accuracy of the Medical equipment play a key role in the doctor's diagnosis and treatment effect, medical metrology as the important technical foundation is to ensure that the equipment, technology, material components are accurate and the application is safe and reliable. Medical equipment have the feature of variety, large quantity, long using cycle, expensive and multi-site, which bring great difficulty in maintenance, equipment management and verification. Therefore, how to get the medical measurement integrate deeply into the advanced internet technology, information technology and the new measuring method, for real-time monitoring of medical equipment, tracking, positioning, and query is particularly important.
Lacbawan, Felicitas L; Weck, Karen E; Kant, Jeffrey A; Feldman, Gerald L; Schrijver, Iris
2012-01-01
The number of clinical laboratories introducing various molecular tests to their existing test menu is continuously increasing. Prior to offering a US Food and Drug Administration-approved test, it is necessary that performance characteristics of the test, as claimed by the company, are verified before the assay is implemented in a clinical laboratory. To provide an example of the verification of a specific qualitative in vitro diagnostic test: cystic fibrosis carrier testing using the Luminex liquid bead array (Luminex Molecular Diagnostics, Inc, Toronto, Ontario). The approach used by an individual laboratory for verification of a US Food and Drug Administration-approved assay is described. Specific verification data are provided to highlight the stepwise verification approach undertaken by a clinical diagnostic laboratory. Protocols for verification of in vitro diagnostic assays may vary between laboratories. However, all laboratories must verify several specific performance specifications prior to implementation of such assays for clinical use. We provide an example of an approach used for verifying performance of an assay for cystic fibrosis carrier screening.
Test systems of the STS-XYTER2 ASIC: from wafer-level to in-system verification
NASA Astrophysics Data System (ADS)
Kasinski, Krzysztof; Zubrzycka, Weronika
2016-09-01
The STS/MUCH-XYTER2 ASIC is a full-size prototype chip for the Silicon Tracking System (STS) and Muon Chamber (MUCH) detectors in the new fixed-target experiment Compressed Baryonic Matter (CBM) at FAIR-center, Darmstadt, Germany. The STS assembly includes more than 14000 ASICs. The complicated, time-consuming, multi-step assembly process of the detector building blocks and tight quality assurance requirements impose several intermediate testing to be performed for verifying crucial assembly steps (e.g. custom microcable tab-bonding before wire-bonding to the PCB) and - if necessary - identifying channels or modules for rework. The chip supports the multi-level testing with different probing / contact methods (wafer probe-card, pogo-probes, in-system tests). A huge number of ASICs to be tested restricts the number and kind of tests possible to be performed within a reasonable time. The proposed architectures of test stand equipment and a brief summary of methodologies are presented in this paper.
Verification of Radar Vehicle Detection Equipment
DOT National Transportation Integrated Search
1999-03-01
Currently, inductive loops are used to count traffic at the 52 permanent sites located in South Dakota. Because they are located within the pavement, the loops are susceptible to being destroyed during maintenance projects. When they are destroyed, i...
Magnetic cleanliness verification approach on tethered satellite
NASA Technical Reports Server (NTRS)
Messidoro, Piero; Braghin, Massimo; Grande, Maurizio
1990-01-01
Magnetic cleanliness testing was performed on the Tethered Satellite as the last step of an articulated verification campaign aimed at demonstrating the capability of the satellite to support its TEMAG (TEthered MAgnetometer) experiment. Tests at unit level and analytical predictions/correlations using a dedicated mathematical model (GANEW program) are also part of the verification activities. Details of the tests are presented, and the results of the verification are described together with recommendations for later programs.
He, Hua; McDermott, Michael P.
2012-01-01
Sensitivity and specificity are common measures of the accuracy of a diagnostic test. The usual estimators of these quantities are unbiased if data on the diagnostic test result and the true disease status are obtained from all subjects in an appropriately selected sample. In some studies, verification of the true disease status is performed only for a subset of subjects, possibly depending on the result of the diagnostic test and other characteristics of the subjects. Estimators of sensitivity and specificity based on this subset of subjects are typically biased; this is known as verification bias. Methods have been proposed to correct verification bias under the assumption that the missing data on disease status are missing at random (MAR), that is, the probability of missingness depends on the true (missing) disease status only through the test result and observed covariate information. When some of the covariates are continuous, or the number of covariates is relatively large, the existing methods require parametric models for the probability of disease or the probability of verification (given the test result and covariates), and hence are subject to model misspecification. We propose a new method for correcting verification bias based on the propensity score, defined as the predicted probability of verification given the test result and observed covariates. This is estimated separately for those with positive and negative test results. The new method classifies the verified sample into several subsamples that have homogeneous propensity scores and allows correction for verification bias. Simulation studies demonstrate that the new estimators are more robust to model misspecification than existing methods, but still perform well when the models for the probability of disease and probability of verification are correctly specified. PMID:21856650
NASA Technical Reports Server (NTRS)
Martinez, Pedro A.; Dunn, Kevin W.
1987-01-01
This paper examines the fundamental problems and goals associated with test, verification, and flight-certification of man-rated distributed data systems. First, a summary of the characteristics of modern computer systems that affect the testing process is provided. Then, verification requirements are expressed in terms of an overall test philosophy for distributed computer systems. This test philosophy stems from previous experience that was gained with centralized systems (Apollo and the Space Shuttle), and deals directly with the new problems that verification of distributed systems may present. Finally, a description of potential hardware and software tools to help solve these problems is provided.
NASA Technical Reports Server (NTRS)
McKinney, Marion O.; Maggin, Bernard
1944-01-01
An investigation has been made in the Langley free-flight tunnel to obtain an experimental verification of the theoretical rudder-free stability characteristics of an airplane model equipped with conventional rudders having negative floating tendencies and negligible friction. The model used in the tests was equipped with a conventional single vertical tail having rudder area 40 percent of the vertical tail area. The model was tested both in free flight and mounted on a strut that allowed freedom only in yaw. Tests were made with three different amounts of rudder aerodynamic balance and with various values of mass, moment of inertia, and center-of-gravity location of the rudder. Most of the stability derivatives required for the theoretical calculations were determined from forced and free-oscillation tests of the particular model tested. The theoretical analysis showed that the rudder-free motions of an airplane consist largely of two oscillatory modes - a long-period oscillation somewhat similar to the normal rudder-fixed oscillation and a short-period oscillation introduced only when the rudder is set free. It was found possible in the tests to create lateral instability of the rudder-free short-period mode by large values of rudder mass parameters even though the rudder-fixed condition was highly stable. The results of the tests and calculation indicated that for most present-day airplanes having rudders of negative floating tendency, the rudder-free stability characteristics may be examined by simply considering the dynamic lateral stability using the value of the directional-stability parameter Cn(sub p) for the rudder-free condition in the conventional controls-fixed lateral-stability equations. For very large airplanes having relatively high values of the rudder mass parameters with respect to the rudder aerodynamic parameters, however, analysis of the rudder-free stability should be made with the complete equations of motion. Good agreement between calculated and measured rudder-free stability characteristics was obtained by use of the general rudder-free stability theory, in which four degrees of lateral freedom are considered. When this assumption is made that the rolling motions alone or the lateral and rolling motions may be neglected in the calculations of rudder-free stability, it is possible to predict satisfactorily the characteristics of the long-period (Dutch roll type) rudder-free oscillation for airplanes only when the effective-dihedral angle is small. With these simplifying assumptions, however, satisfactory prediction of the short-period oscillation may be obtained for any dihedral. Further simplification of the theory based on the assumption that the rudder moment of inertia might be disregarded was found to be invalid because this assumption made it impossible to calculate the characteristics of the short-period oscillations.
Joint ETV/NOWATECH test plan for the Sorbisense GSW40 passive sampler
The joint test plan is the implementation of a test design developed for verification of the performance of an environmental technology following the NOWATECH ETV method. The verification is a joint verification with the US EPA ETV scheme and the Advanced Monitoring Systems Cent...
Dynamic testing for shuttle design verification
NASA Technical Reports Server (NTRS)
Green, C. E.; Leadbetter, S. A.; Rheinfurth, M. H.
1972-01-01
Space shuttle design verification requires dynamic data from full scale structural component and assembly tests. Wind tunnel and other scaled model tests are also required early in the development program to support the analytical models used in design verification. Presented is a design philosophy based on mathematical modeling of the structural system strongly supported by a comprehensive test program; some of the types of required tests are outlined.
Software for imaging phase-shift interference microscope
NASA Astrophysics Data System (ADS)
Malinovski, I.; França, R. S.; Couceiro, I. B.
2018-03-01
In recent years absolute interference microscope was created at National Metrology Institute of Brazil (INMETRO). The instrument by principle of operation is imaging phase-shifting interferometer (PSI) equipped with two stabilized lasers of different colour as traceable reference wavelength sources. We report here some progress in development of the software for this instrument. The status of undergoing internal validation and verification of the software is also reported. In contrast with standard PSI method, different methodology of phase evaluation is applied. Therefore, instrument specific procedures for software validation and verification are adapted and discussed.
A High-Level Language for Modeling Algorithms and Their Properties
NASA Astrophysics Data System (ADS)
Akhtar, Sabina; Merz, Stephan; Quinson, Martin
Designers of concurrent and distributed algorithms usually express them using pseudo-code. In contrast, most verification techniques are based on more mathematically-oriented formalisms such as state transition systems. This conceptual gap contributes to hinder the use of formal verification techniques. Leslie Lamport introduced PlusCal, a high-level algorithmic language that has the "look and feel" of pseudo-code, but is equipped with a precise semantics and includes a high-level expression language based on set theory. PlusCal models can be compiled to TLA + and verified using the model checker tlc.
Cleanup Verification Package for the 118-F-1 Burial Ground
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. J. Farris and H. M. Sulloway
2008-01-10
This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.
NASA Astrophysics Data System (ADS)
Carmignato, Simone
2009-01-01
Optical sensors are increasingly used for dimensional and geometrical metrology. However, the lack of international standards for testing optical coordinate measuring systems is currently limiting the traceability of measurements and the easy comparison of different optical systems. This paper presents an experimental investigation on artefacts and procedures for testing coordinate measuring systems equipped with optical distance sensors. The work is aimed at contributing to the standardization of testing methods. The VDI/VDE 2617-6.2:2005 guideline, which is probably the most complete document available at the state of the art for testing systems with optical distance sensors, is examined with specific experiments. Results from the experiments are discussed, with particular reference to the tests used for determining the following characteristics: error of indication for size measurement, probing error and structural resolution. Particular attention is given to the use of artefacts alternative to gauge blocks for determining the error of indication for size measurement.
Dental equipment test during zero-gravity flight
NASA Technical Reports Server (NTRS)
Young, John; Gosbee, John; Billica, Roger
1991-01-01
The overall objectives of this program were to establish performance criteria and develop prototype equipment for use in the Health Maintenance Facility (HMF) in meeting the needs of dental emergencies during space missions. The primary efforts during this flight test were to test patient-operator relationships, patent (manikin) restraint and positioning, task lighting systems, use and operation of dental rotary instruments, suction and particle containment system, dental hand instrument delivery and control procedures, and the use of dental treatment materials. The initial efforts during the flight focused on verification of the efficiency of the particle containment system. An absorptive barrier was also tested in lieu of the suction collector. To test the instrument delivery system, teeth in the manikin were prepared with the dental drill to receive restorations, some with temporary filling materials and another with definitive filling material (composite resin). The best particle containment came from the combination use of the laminar-air/suction collector in concert with immediate area suction from a surgical high-volume suction tip. Lighting in the treatment area was provided by a flexible fiberoptic probe. This system is quite effective for small areas, but for general tasks ambient illumination is required. The instrument containment system (elastic cord network) was extremely effective and easy to use. The most serious problem with instrument delivey and actual treatment was lack of time during the microgravity sequences. The restorative materials handled and finished well.
Enhanced Verification Test Suite for Physics Simulation Codes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kamm, J R; Brock, J S; Brandon, S T
2008-10-10
This document discusses problems with which to augment, in quantity and in quality, the existing tri-laboratory suite of verification problems used by Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and Sandia National Laboratories (SNL). The purpose of verification analysis is demonstrate whether the numerical results of the discretization algorithms in physics and engineering simulation codes provide correct solutions of the corresponding continuum equations. The key points of this document are: (1) Verification deals with mathematical correctness of the numerical algorithms in a code, while validation deals with physical correctness of a simulation in a regime of interest.more » This document is about verification. (2) The current seven-problem Tri-Laboratory Verification Test Suite, which has been used for approximately five years at the DOE WP laboratories, is limited. (3) Both the methodology for and technology used in verification analysis have evolved and been improved since the original test suite was proposed. (4) The proposed test problems are in three basic areas: (a) Hydrodynamics; (b) Transport processes; and (c) Dynamic strength-of-materials. (5) For several of the proposed problems we provide a 'strong sense verification benchmark', consisting of (i) a clear mathematical statement of the problem with sufficient information to run a computer simulation, (ii) an explanation of how the code result and benchmark solution are to be evaluated, and (iii) a description of the acceptance criterion for simulation code results. (6) It is proposed that the set of verification test problems with which any particular code be evaluated include some of the problems described in this document. Analysis of the proposed verification test problems constitutes part of a necessary--but not sufficient--step that builds confidence in physics and engineering simulation codes. More complicated test cases, including physics models of greater sophistication or other physics regimes (e.g., energetic material response, magneto-hydrodynamics), would represent a scientifically desirable complement to the fundamental test cases discussed in this report. The authors believe that this document can be used to enhance the verification analyses undertaken at the DOE WP Laboratories and, thus, to improve the quality, credibility, and usefulness of the simulation codes that are analyzed with these problems.« less
Equipment management risk rating system based on engineering endpoints.
James, P J
1999-01-01
The equipment management risk ratings system outlined here offers two significant departures from current practice: risk classifications are based on intrinsic device risks, and the risk rating system is based on engineering endpoints. Intrinsic device risks are categorized as physical, clinical and technical, and these flow from the incoming equipment assessment process. Engineering risk management is based on verification of engineering endpoints such as clinical measurements or energy delivery. This practice eliminates the ambiguity associated with ranking risk in terms of physiologic and higher-level outcome endpoints such as no significant hazards, low significance, injury, or mortality.
Commissioning and Science Verification of JAST/T80
NASA Astrophysics Data System (ADS)
Ederoclte, A.; Cenarro, A. J.; Marín-Franch, A.; Cristóbal-Hornillos, D.; Vázquez Ramió, H.; Varela, J.; Hurier, G.; Moles, M.; Lamadrid, J. L.; Díaz-Martín, M. C.; Iglesias Marzoa, R.; Tilve, V.; Rodríguez, S.; Maícas, N.; Abri, J.
2017-03-01
Located at the Observatorio Astrofísico de Javalambre, the ’’Javalambre Auxiliary Survey Telescope’’ is an 80cm telescope with a unvignetted 2 square degrees field of view. The telescope is equipped with T80Cam, a camera with a large format CCD and two filter wheels which can host, at any given time, 12 filters. The telescope has been designed to provide optical quality all across the field of view, which is achieved with a field corrector. In this talk, I will review the commissioning of the telescope. The optical performance in the centre of the field of view has been tested with lucky imaging technique, providing a telescope PSF of 0.4’’, which is close to the one expected from theory. Moreover, the tracking of the telescope does not affect the image quality, as it has been shown that stars appear round even in exposures of 10minutes obtained without guiding. Most importantly, we present the preliminary results of science verification observations which combine the two main characteristics of this telescope: the large field of view and the special filter set.
Verifiable fault tolerance in measurement-based quantum computation
NASA Astrophysics Data System (ADS)
Fujii, Keisuke; Hayashi, Masahito
2017-09-01
Quantum systems, in general, cannot be simulated efficiently by a classical computer, and hence are useful for solving certain mathematical problems and simulating quantum many-body systems. This also implies, unfortunately, that verification of the output of the quantum systems is not so trivial, since predicting the output is exponentially hard. As another problem, the quantum system is very delicate for noise and thus needs an error correction. Here, we propose a framework for verification of the output of fault-tolerant quantum computation in a measurement-based model. In contrast to existing analyses on fault tolerance, we do not assume any noise model on the resource state, but an arbitrary resource state is tested by using only single-qubit measurements to verify whether or not the output of measurement-based quantum computation on it is correct. Verifiability is equipped by a constant time repetition of the original measurement-based quantum computation in appropriate measurement bases. Since full characterization of quantum noise is exponentially hard for large-scale quantum computing systems, our framework provides an efficient way to practically verify the experimental quantum error correction.
Performance verification testing of the UltraStrip Systems, Inc., Mobile Emergency Filtration System (MEFS) was conducted under EPA's Environmental Technology Verification (ETV) Program at the EPA Test and Evaluation (T&E) Facility in Cincinnati, Ohio, during November, 2003, thr...
EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory
NASA Technical Reports Server (NTRS)
Jairala, Juniper; Durkin, Robert
2012-01-01
As an early step in preparing for future EVAs, astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. To date, neutral buoyancy demonstrations at NASA JSC’s Sonny Carter Training Facility have primarily evaluated assembly and maintenance tasks associated with several elements of the ISS. With the retirement of the Space Shuttle, completion of ISS assembly, and introduction of commercial participants for human transportation into space, evaluations at the NBL will take on a new focus. In this session, Juniper Jairala briefly discussed the design of the NBL and, in more detail, described the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated. Robert Durkin discussed the new and potential types of uses for the NBL, including those by non-NASA external customers.
EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory
NASA Technical Reports Server (NTRS)
Jairala, Juniper; Durkin, Robert
2012-01-01
As an early step in preparing for future EVAs, astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. To date, neutral buoyancy demonstrations at NASA JSC's Sonny Carter Training Facility have primarily evaluated assembly and maintenance tasks associated with several elements of the ISS. With the retirement of the Space Shuttle, completion of ISS assembly, and introduction of commercial participants for human transportation into space, evaluations at the NBL will take on a new focus. In this session, Juniper Jairala briefly discussed the design of the NBL and, in more detail, described the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated. Robert Durkin discussed the new and potential types of uses for the NBL, including those by non-NASA external customers.
NASA Technical Reports Server (NTRS)
Morrison, D. R.; Lewis, M. L.
1982-01-01
Static zone electrophoresis is an electrokinetic method of separating macromolecules and small particles. However, its application for the isolation of biological cells and concentrated protein solutions is limited by sedimentation and convection. Microgravity eliminates or reduces sedimentation, floatation, and density-driven convection arising from either Joule heating or concentration differences. The advantages of such an environment were first demonstrated in space during the Apollo 14 and 16 missions. In 1975 the Electrophoresis Technology Experiment (MA-011) was conducted during the Apollo-Soyuz Test Project flight. In 1979 a project was initiated to repeat the separations of human kidney cells. One of the major objectives of the Electrophoresis Equipment Verification Tests (EEVT) on STS-3 was to repeat and thereby validate the first successful electrophoretic separation of human kidney cells. Attention is given to the EEVT apparatus, the preflight electrophoresis, and inflight operational results.
ENVIRONMENTAL TECHNOLOGY VERIFICATION FOR INDOOR AIR PRODUCTS
The paper discusses environmental technology verification (ETV) for indoor air products. RTI is developing the framework for a verification testing program for indoor air products, as part of EPA's ETV program. RTI is establishing test protocols for products that fit into three...
The Environmental Technology Verification (ETV) – Environmental and Sustainable Technology Evaluations (ESTE) Program conducts third-party verification testing of commercially available technologies that may accomplish environmental program management goals. In this verification...
PERFORMANCE VERIFICATION TEST FOR FIELD-PORTABLE MEASUREMENTS OF LEAD IN DUST
The US Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program (www.epa.jzov/etv) conducts performance verification tests of technologies used for the characterization and monitoring of contaminated media. The program exists to provide high-quali...
VERIFICATION TESTING OF HIGH-RATE MECHANICAL INDUCTION MIXERS FOR CHEMICAL DISINFECTANTS
This paper describes the results of verification testing of mechanical induction mixers for dispersion of chemical disinfectants in wet-weather flow (WWF) conducted under the U.S. Environmental Protection Agency's Environmental Technology Verification (ETV) WWF Pilot Program. Th...
Lessons from UNSCOM and IAEA regarding remote monitoring and air sampling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dupree, S.A.
1996-01-01
In 1991, at the direction of the United Nations Security Council, UNSCOM and IAEA developed plans for On-going Monitoring and Verification (OMV) in Iraq. The plans were accepted by the Security Council and remote monitoring and atmospheric sampling equipment has been installed at selected sites in Iraq. The remote monitoring equipment consists of video cameras and sensors positioned to observe equipment or activities at sites that could be used to support the development or manufacture of weapons of mass destruction, or long-range missiles. The atmospheric sampling equipment provides unattended collection of chemical samples from sites that could be used tomore » support the development or manufacture of chemical weapon agents. To support OMV in Iraq, UNSCOM has established the Baghdad Monitoring and Verification Centre. Imagery from the remote monitoring cameras can be accessed in near-real time from the Centre through RIF communication links with the monitored sites. The OMV program in Iraq has implications for international cooperative monitoring in both global and regional contexts. However, monitoring systems such as those used in Iraq are not sufficient, in and of themselves, to guarantee the absence of prohibited activities. Such systems cannot replace on-site inspections by competent, trained inspectors. However, monitoring similar to that used in Iraq can contribute to openness and confidence building, to the development of mutual trust, and to the improvement of regional stability.« less
Gaia challenging performances verification: combination of spacecraft models and test results
NASA Astrophysics Data System (ADS)
Ecale, Eric; Faye, Frédéric; Chassat, François
2016-08-01
To achieve the ambitious scientific objectives of the Gaia mission, extremely stringent performance requirements have been given to the spacecraft contractor (Airbus Defence and Space). For a set of those key-performance requirements (e.g. end-of-mission parallax, maximum detectable magnitude, maximum sky density or attitude control system stability), this paper describes how they are engineered during the whole spacecraft development process, with a focus on the end-to-end performance verification. As far as possible, performances are usually verified by end-to-end tests onground (i.e. before launch). However, the challenging Gaia requirements are not verifiable by such a strategy, principally because no test facility exists to reproduce the expected flight conditions. The Gaia performance verification strategy is therefore based on a mix between analyses (based on spacecraft models) and tests (used to directly feed the models or to correlate them). Emphasis is placed on how to maximize the test contribution to performance verification while keeping the test feasible within an affordable effort. In particular, the paper highlights the contribution of the Gaia Payload Module Thermal Vacuum test to the performance verification before launch. Eventually, an overview of the in-flight payload calibration and in-flight performance verification is provided.
Test and Verification Approach for the NASA Constellation Program
NASA Technical Reports Server (NTRS)
Strong, Edward
2008-01-01
This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.
Towards composition of verified hardware devices
NASA Technical Reports Server (NTRS)
Schubert, E. Thomas; Levitt, K.; Cohen, G. C.
1991-01-01
Computers are being used where no affordable level of testing is adequate. Safety and life critical systems must find a replacement for exhaustive testing to guarantee their correctness. Through a mathematical proof, hardware verification research has focused on device verification and has largely ignored system composition verification. To address these deficiencies, we examine how the current hardware verification methodology can be extended to verify complete systems.
NASA Technical Reports Server (NTRS)
Barile, Ronald G.; Fogarty, Chris; Cantrell, Chris; Melton, Gregory S.
1994-01-01
NASA personnel at Kennedy Space Center's Material Science Laboratory have developed new environmentally sound precision cleaning and verification techniques for systems and components found at the center. This technology is required to replace existing methods traditionally employing CFC-113. The new patent-pending technique of precision cleaning verification is for large components of cryogenic fluid systems. These are stainless steel, sand cast valve bodies with internal surface areas ranging from 0.2 to 0.9 sq m. Extrapolation of this technique to components of even larger sizes (by orders of magnitude) is planned. Currently, the verification process is completely manual. In the new technique, a high velocity, low volume water stream impacts the part to be verified. This process is referred to as Breathing Air/Water Impingement and forms the basis for the Impingement Verification System (IVS). The system is unique in that a gas stream is used to accelerate the water droplets to high speeds. Water is injected into the gas stream in a small, continuous amount. The air/water mixture is then passed through a converging/diverging nozzle where the gas is accelerated to supersonic velocities. These droplets impart sufficient energy to the precision cleaned surface to place non-volatile residue (NVR) contaminants into suspension in the water. The sample water is collected and its NVR level is determined by total organic carbon (TOC) analysis at 880 C. The TOC, in ppm carbon, is used to establish the NVR level. A correlation between the present gravimetric CFC113 NVR and the IVS NVR is found from experimental sensitivity factors measured for various contaminants. The sensitivity has the units of ppm of carbon per mg/sq ft of contaminant. In this paper, the equipment is described and data are presented showing the development of the sensitivity factors from a test set including four NVRs impinged from witness plates of 0.05 to 0.75 sq m.
NASA Technical Reports Server (NTRS)
Barile, Ronald G.; Fogarty, Chris; Cantrell, Chris; Melton, Gregory S.
1995-01-01
NASA personnel at Kennedy Space Center's Material Science Laboratory have developed new environmentally sound precision cleaning and verification techniques for systems and components found at the center. This technology is required to replace existing methods traditionally employing CFC-113. The new patent-pending technique of precision cleaning verification is for large components of cryogenic fluid systems. These are stainless steel, sand cast valve bodies with internal surface areas ranging from 0.2 to 0.9 m(exp 2). Extrapolation of this technique to components of even larger sizes (by orders of magnitude) is planned. Currently, the verification process is completely manual. In the new technique, a high velocity, low volume water stream impacts the part to be verified. This process is referred to as Breathing Air/Water Impingement and forms the basis for the Impingement Verification System (IVS). The system is unique in that a gas stream is used to accelerate the water droplets to high speeds. Water is injected into the gas stream in a small, continuous amount. The air/water mixture is then passed through a converging-diverging nozzle where the gas is accelerated to supersonic velocities. These droplets impart sufficient energy to the precision cleaned surface to place non-volatile residue (NVR) contaminants into suspension in the water. The sample water is collected and its NVR level is determined by total organic carbon (TOC) analysis at 880 C. The TOC, in ppm carbon, is used to establish the NVR level. A correlation between the present gravimetric CFC-113 NVR and the IVS NVR is found from experimental sensitivity factors measured for various contaminants. The sensitivity has the units of ppm of carbon per mg-ft(exp 2) of contaminant. In this paper, the equipment is described and data are presented showing the development of the sensitivity factors from a test set including four NVR's impinged from witness plates of 0.05 to 0.75 m(exp 2).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pawlus, Witold, E-mail: witold.p.pawlus@ieee.org; Ebbesen, Morten K.; Hansen, Michael R.
Design of offshore drilling equipment is a task that involves not only analysis of strict machine specifications and safety requirements but also consideration of changeable weather conditions and harsh environment. These challenges call for a multidisciplinary approach and make the design process complex. Various modeling software products are currently available to aid design engineers in their effort to test and redesign equipment before it is manufactured. However, given the number of available modeling tools and methods, the choice of the proper modeling methodology becomes not obvious and – in some cases – troublesome. Therefore, we present a comparative analysis ofmore » two popular approaches used in modeling and simulation of mechanical systems: multibody and analytical modeling. A gripper arm of the offshore vertical pipe handling machine is selected as a case study for which both models are created. In contrast to some other works, the current paper shows verification of both systems by benchmarking their simulation results against each other. Such criteria as modeling effort and results accuracy are evaluated to assess which modeling strategy is the most suitable given its eventual application.« less
WRAP-RIB antenna technology development
NASA Technical Reports Server (NTRS)
Freeland, R. E.; Garcia, N. F.; Iwamoto, H.
1985-01-01
The wrap-rib deployable antenna concept development is based on a combination of hardware development and testing along with extensive supporting analysis. The proof-of-concept hardware models are large in size so they will address the same basic problems associated with the design fabrication, assembly and test as the full-scale systems which were selected to be 100 meters at the beginning of the program. The hardware evaluation program consists of functional performance tests, design verification tests and analytical model verification tests. Functional testing consists of kinematic deployment, mesh management and verification of mechanical packaging efficiencies. Design verification consists of rib contour precision measurement, rib cross-section variation evaluation, rib materials characterizations and manufacturing imperfections assessment. Analytical model verification and refinement include mesh stiffness measurement, rib static and dynamic testing, mass measurement, and rib cross-section characterization. This concept was considered for a number of potential applications that include mobile communications, VLBI, and aircraft surveillance. In fact, baseline system configurations were developed by JPL, using the appropriate wrap-rib antenna, for all three classes of applications.
The Search for Nonflammable Solvent Alternatives for Cleaning Aerospace Oxygen Systems
NASA Technical Reports Server (NTRS)
Mitchell, Mark A.; Lowrey, Nikki
2012-01-01
To obtain a high degree of cleanliness without risk of corrosion or hazardous reactivity, hydrochlorofluorocarbon (HCFC)-225 is used for cleaning and cleanliness verification of oxygen system components used on NASA fs bipropellant launch vehicles, associated test stands and support equipment. HCFC-225 is a Class II Ozone Depleting Substance (ODS ]II) that was introduced to replace chlorofluorocarbon (CFC)-113, a Class I ODS solvent that is now banned. To meet environmental regulations to eliminate the use of ozone depleting substances, a replacement solvent is required for HCFC ]225 that is effective at removing oils, greases, and particulate from large oxygen system components, is compatible with materials used in the construction of these systems, and is nonflammable and non ]reactive in enriched oxygen environments. A solvent replacement is also required for aviator fs breathing oxygen systems and other related equipment currently cleaned and verified with HCFC ]225 and stockpiled CFC -113. Requirements and challenges in the search for nonflammable replacement solvents are discussed.
VERIFICATION TESTING OF HIGH-RATE MECHANICAL INDUCTION MIXERS FOR CHEMICAL DISINFECTANTS, Oregon
This paper describes the results of verification testing of mechanical induction mixers for dispersion of chemical disinfectants in wet-weather flow (WWF) conducted under the U.S. Environmental Protection Agency's Environmental Technology Verification (ETV) WWF Pilot Program. Th...
PFLOTRAN Verification: Development of a Testing Suite to Ensure Software Quality
NASA Astrophysics Data System (ADS)
Hammond, G. E.; Frederick, J. M.
2016-12-01
In scientific computing, code verification ensures the reliability and numerical accuracy of a model simulation by comparing the simulation results to experimental data or known analytical solutions. The model is typically defined by a set of partial differential equations with initial and boundary conditions, and verification ensures whether the mathematical model is solved correctly by the software. Code verification is especially important if the software is used to model high-consequence systems which cannot be physically tested in a fully representative environment [Oberkampf and Trucano (2007)]. Justified confidence in a particular computational tool requires clarity in the exercised physics and transparency in its verification process with proper documentation. We present a quality assurance (QA) testing suite developed by Sandia National Laboratories that performs code verification for PFLOTRAN, an open source, massively-parallel subsurface simulator. PFLOTRAN solves systems of generally nonlinear partial differential equations describing multiphase, multicomponent and multiscale reactive flow and transport processes in porous media. PFLOTRAN's QA test suite compares the numerical solutions of benchmark problems in heat and mass transport against known, closed-form, analytical solutions, including documentation of the exercised physical process models implemented in each PFLOTRAN benchmark simulation. The QA test suite development strives to follow the recommendations given by Oberkampf and Trucano (2007), which describes four essential elements in high-quality verification benchmark construction: (1) conceptual description, (2) mathematical description, (3) accuracy assessment, and (4) additional documentation and user information. Several QA tests within the suite will be presented, including details of the benchmark problems and their closed-form analytical solutions, implementation of benchmark problems in PFLOTRAN simulations, and the criteria used to assess PFLOTRAN's performance in the code verification procedure. References Oberkampf, W. L., and T. G. Trucano (2007), Verification and Validation Benchmarks, SAND2007-0853, 67 pgs., Sandia National Laboratories, Albuquerque, NM.
Bayesian Estimation of Combined Accuracy for Tests with Verification Bias
Broemeling, Lyle D.
2011-01-01
This presentation will emphasize the estimation of the combined accuracy of two or more tests when verification bias is present. Verification bias occurs when some of the subjects are not subject to the gold standard. The approach is Bayesian where the estimation of test accuracy is based on the posterior distribution of the relevant parameter. Accuracy of two combined binary tests is estimated employing either “believe the positive” or “believe the negative” rule, then the true and false positive fractions for each rule are computed for two tests. In order to perform the analysis, the missing at random assumption is imposed, and an interesting example is provided by estimating the combined accuracy of CT and MRI to diagnose lung cancer. The Bayesian approach is extended to two ordinal tests when verification bias is present, and the accuracy of the combined tests is based on the ROC area of the risk function. An example involving mammography with two readers with extreme verification bias illustrates the estimation of the combined test accuracy for ordinal tests. PMID:26859487
This ETV program generic verification protocol was prepared and reviewed for the Verification of Pesticide Drift Reduction Technologies project. The protocol provides a detailed methodology for conducting and reporting results from a verification test of pesticide drift reductio...
This generic verification protocol provides a detailed method to conduct and report results from a verification test of pesticide application technologies that can be used to evaluate these technologies for their potential to reduce spray drift.
Schlaberg, Robert; Mitchell, Michael J; Taggart, Edward W; She, Rosemary C
2012-01-01
US Food and Drug Administration (FDA)-approved diagnostic tests based on molecular genetic technologies are becoming available for an increasing number of microbial pathogens. Advances in technology and lower costs have moved molecular diagnostic tests formerly performed for research purposes only into much wider use in clinical microbiology laboratories. To provide an example of laboratory studies performed to verify the performance of an FDA-approved assay for the detection of Clostridium difficile cytotoxin B compared with the manufacturer's performance standards. We describe the process and protocols used by a laboratory for verification of an FDA-approved assay, assess data from the verification studies, and implement the assay after verification. Performance data from the verification studies conducted by the laboratory were consistent with the manufacturer's performance standards and the assay was implemented into the laboratory's test menu. Verification studies are required for FDA-approved diagnostic assays prior to use in patient care. Laboratories should develop a standardized approach to verification studies that can be adapted and applied to different types of assays. We describe the verification of an FDA-approved real-time polymerase chain reaction assay for the detection of a toxin gene in a bacterial pathogen.
Nonstationary Transient Vibroacoustic Response of a Beam Structure
NASA Technical Reports Server (NTRS)
Caimi, R. E.; Margasahayam, R. N.; Nayfeh, Jamal F.
1997-01-01
This study consists of an investigation into the nonstationary transient response of the Verification Test Article (VETA) when subjected to random acoustic excitation. The goal is to assess excitation models that can be used in the design of structures and equipment when knowledge of the structure and the excitation is limited. The VETA is an instrumented cantilever beam that was exposed to acoustic loading during five Space Shuttle launches. The VETA analytical structural model response is estimated using the direct averaged power spectral density and the normalized pressure spectra methods. The estimated responses are compared to the measured response of the VETA. These comparisons are discussed with a focus on prediction conservatism and current design practice.
Production of primary mirror segments for the Giant Magellan Telescope
NASA Astrophysics Data System (ADS)
Martin, H. M.; Allen, R. G.; Burge, J. H.; Davis, J. M.; Davison, W. B.; Johns, M.; Kim, D. W.; Kingsley, J. S.; Law, K.; Lutz, R. D.; Strittmatter, P. A.; Su, P.; Tuell, M. T.; West, S. C.; Zhou, P.
2014-07-01
Segment production for the Giant Magellan Telescope is well underway, with the off-axis Segment 1 completed, off-axis Segments 2 and 3 already cast, and mold construction in progress for the casting of Segment 4, the center segment. All equipment and techniques required for segment fabrication and testing have been demonstrated in the manufacture of Segment 1. The equipment includes a 28 m test tower that incorporates four independent measurements of the segment's figure and geometry. The interferometric test uses a large asymmetric null corrector with three elements including a 3.75 m spherical mirror and a computer-generated hologram. For independent verification of the large-scale segment shape, we use a scanning pentaprism test that exploits the natural geometry of the telescope to focus collimated light to a point. The Software Configurable Optical Test System, loosely based on the Hartmann test, measures slope errors to submicroradian accuracy at high resolution over the full aperture. An enhanced laser tracker system guides the figuring through grinding and initial polishing. All measurements agree within the expected uncertainties, including three independent measurements of radius of curvature that agree within 0.3 mm. Segment 1 was polished using a 1.2 m stressed lap for smoothing and large-scale figuring, and a set of smaller passive rigid-conformal laps on an orbital polisher for deterministic small-scale figuring. For the remaining segments, the Mirror Lab is building a smaller, orbital stressed lap to combine the smoothing capability with deterministic figuring.
47 CFR 15.101 - Equipment authorization of unintentional radiators.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... TV interface device Declaration of Conformity or Certification. Cable system terminal device Declaration of Conformity. Stand-alone cable input selector switch Verification. Class B personal computers... used with Class B personal computers Declaration of Conformity or Certification. 1 Class B personal...
47 CFR 15.101 - Equipment authorization of unintentional radiators.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... TV interface device Declaration of Conformity or Certification. Cable system terminal device Declaration of Conformity. Stand-alone cable input selector switch Verification. Class B personal computers... used with Class B personal computers Declaration of Conformity or Certification. 1 Class B personal...
47 CFR 15.101 - Equipment authorization of unintentional radiators.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... TV interface device Declaration of Conformity or Certification. Cable system terminal device Declaration of Conformity. Stand-alone cable input selector switch Verification. Class B personal computers... used with Class B personal computers Declaration of Conformity or Certification. 1 Class B personal...
47 CFR 15.101 - Equipment authorization of unintentional radiators.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... TV interface device Declaration of Conformity or Certification. Cable system terminal device Declaration of Conformity. Stand-alone cable input selector switch Verification. Class B personal computers... used with Class B personal computers Declaration of Conformity or Certification. 1 Class B personal...
47 CFR 15.101 - Equipment authorization of unintentional radiators.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... TV interface device Declaration of Conformity or Certification. Cable system terminal device Declaration of Conformity. Stand-alone cable input selector switch Verification. Class B personal computers... used with Class B personal computers Declaration of Conformity or Certification. 1 Class B personal...
Verification testing of the ReCip® RTS-500 System was conducted over a 12-month period at the Massachusetts Alternative Septic System Test Center (MASSTC) located on Otis Air National Guard Base in Bourne, Massachusetts. A nine-week startup period preceded the verification test t...
Definition of ground test for Large Space Structure (LSS) control verification
NASA Technical Reports Server (NTRS)
Waites, H. B.; Doane, G. B., III; Tollison, D. K.
1984-01-01
An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.
Measurement of ultrasound power using a calorimeter
NASA Astrophysics Data System (ADS)
Morgado, G.; Miqueleti, S.; Costa-Felix, R. P. B.
2018-03-01
This paper presents a comparison between the ultrasound power of a 1 MHz therapy equipment on the water using a calorimeter and a radiation force balance. For a range of 5 to 10 W, the results presented a normalized error less than 1, disclosing compatibility of the results from the developed system and the radiation force balance. The calorimetric method might be used as a faster and cheaper means for the verification of the ultrasonic power emitted by an equipment for physiotherapeutic treatment.
Verification of a VRF Heat Pump Computer Model in EnergyPlus
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigusse, Bereket; Raustad, Richard
2013-06-15
This paper provides verification results of the EnergyPlus variable refrigerant flow (VRF) heat pump computer model using manufacturer's performance data. The paper provides an overview of the VRF model, presents the verification methodology, and discusses the results. The verification provides quantitative comparison of full and part-load performance to manufacturer's data in cooling-only and heating-only modes of operation. The VRF heat pump computer model uses dual range bi-quadratic performance curves to represent capacity and Energy Input Ratio (EIR) as a function of indoor and outdoor air temperatures, and dual range quadratic performance curves as a function of part-load-ratio for modeling part-loadmore » performance. These performance curves are generated directly from manufacturer's published performance data. The verification compared the simulation output directly to manufacturer's performance data, and found that the dual range equation fit VRF heat pump computer model predicts the manufacturer's performance data very well over a wide range of indoor and outdoor temperatures and part-load conditions. The predicted capacity and electric power deviations are comparbale to equation-fit HVAC computer models commonly used for packaged and split unitary HVAC equipment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurnik, Charles W.; Tiessen, Alex
Retrocommissioning (RCx) is a systematic process for optimizing energy performance in existing buildings. It specifically focuses on improving the control of energy-using equipment (e.g., heating, ventilation, and air conditioning [HVAC] equipment and lighting) and typically does not involve equipment replacement. Field results have shown proper RCx can achieve energy savings ranging from 5 percent to 20 percent, with a typical payback of two years or less (Thorne 2003). The method presented in this protocol provides direction regarding: (1) how to account for each measure's specific characteristics and (2) how to choose the most appropriate savings verification approach.
Martin, Edward J [Virginia Beach, VA
2008-01-15
A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.
The verification test will be conducted under the auspices of the U.S. Environmental Protection Agency (EPA) through the Environmental Technology Verification (ETV) Program. It will be performed by Battelle, which is managing the ETV Advanced Monitoring Systems (AMS) Center throu...
47 CFR 15.31 - Measurement standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., such as perimeter protection systems, carrier current systems, and systems employing a “leaky” coaxial cable as an antenna, measurements for verification or for obtaining a grant of equipment authorization... interconnecting cables as determined by the boundary defined by an imaginary straight line periphery describing a...
Murias, Juan M; Pogliaghi, Silvia; Paterson, Donald H
2018-01-01
The accuracy of an exhaustive ramp incremental (RI) test to determine maximal oxygen uptake ([Formula: see text]O 2max ) was recently questioned and the utilization of a verification phase proposed as a gold standard. This study compared the oxygen uptake ([Formula: see text]O 2 ) during a RI test to that obtained during a verification phase aimed to confirm attainment of [Formula: see text]O 2max . Sixty-one healthy males [31 older (O) 65 ± 5 yrs; 30 younger (Y) 25 ± 4 yrs] performed a RI test (15-20 W/min for O and 25 W/min for Y). At the end of the RI test, a 5-min recovery period was followed by a verification phase of constant load cycling to fatigue at either 85% ( n = 16) or 105% ( n = 45) of the peak power output obtained from the RI test. The highest [Formula: see text]O 2 after the RI test (39.8 ± 11.5 mL·kg -1 ·min -1 ) and the verification phase (40.1 ± 11.2 mL·kg -1 ·min -1 ) were not different ( p = 0.33) and they were highly correlated ( r = 0.99; p < 0.01). This response was not affected by age or intensity of the verification phase. The Bland-Altman analysis revealed a very small absolute bias (-0.25 mL·kg -1 ·min -1 , not different from 0) and a precision of ±1.56 mL·kg -1 ·min -1 between measures. This study indicated that a verification phase does not highlight an under-estimation of [Formula: see text]O 2max derived from a RI test, in a large and heterogeneous group of healthy younger and older men naïve to laboratory testing procedures. Moreover, only minor within-individual differences were observed between the maximal [Formula: see text]O 2 elicited during the RI and the verification phase. Thus a verification phase does not add any validation of the determination of a [Formula: see text]O 2max . Therefore, the recommendation that a verification phase should become a gold standard procedure, although initially appealing, is not supported by the experimental data.
Code Verification Results of an LLNL ASC Code on Some Tri-Lab Verification Test Suite Problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, S R; Bihari, B L; Salari, K
As scientific codes become more complex and involve larger numbers of developers and algorithms, chances for algorithmic implementation mistakes increase. In this environment, code verification becomes essential to building confidence in the code implementation. This paper will present first results of a new code verification effort within LLNL's B Division. In particular, we will show results of code verification of the LLNL ASC ARES code on the test problems: Su Olson non-equilibrium radiation diffusion, Sod shock tube, Sedov point blast modeled with shock hydrodynamics, and Noh implosion.
Analytical Verifications in Cryogenic Testing of NGST Advanced Mirror System Demonstrators
NASA Technical Reports Server (NTRS)
Cummings, Ramona; Levine, Marie; VanBuren, Dave; Kegley, Jeff; Green, Joseph; Hadaway, James; Presson, Joan; Cline, Todd; Stahl, H. Philip (Technical Monitor)
2002-01-01
Ground based testing is a critical and costly part of component, assembly, and system verifications of large space telescopes. At such tests, however, with integral teamwork by planners, analysts, and test personnel, segments can be included to validate specific analytical parameters and algorithms at relatively low additional cost. This paper opens with strategy of analytical verification segments added to vacuum cryogenic testing of Advanced Mirror System Demonstrator (AMSD) assemblies. These AMSD assemblies incorporate material and architecture concepts being considered in the Next Generation Space Telescope (NGST) design. The test segments for workmanship testing, cold survivability, and cold operation optical throughput are supplemented by segments for analytical verifications of specific structural, thermal, and optical parameters. Utilizing integrated modeling and separate materials testing, the paper continues with support plan for analyses, data, and observation requirements during the AMSD testing, currently slated for late calendar year 2002 to mid calendar year 2003. The paper includes anomaly resolution as gleaned by authors from similar analytical verification support of a previous large space telescope, then closes with draft of plans for parameter extrapolations, to form a well-verified portion of the integrated modeling being done for NGST performance predictions.
Considerations in STS payload environmental verification
NASA Technical Reports Server (NTRS)
Keegan, W. B.
1978-01-01
Considerations regarding the Space Transportation System (STS) payload environmental verification are reviewed. It is noted that emphasis is placed on testing at the subassembly level and that the basic objective of structural dynamic payload verification is to ensure reliability in a cost-effective manner. Structural analyses consist of: (1) stress analysis for critical loading conditions, (2) model analysis for launch and orbital configurations, (3) flight loads analysis, (4) test simulation analysis to verify models, (5) kinematic analysis of deployment/retraction sequences, and (6) structural-thermal-optical program analysis. In addition to these approaches, payload verification programs are being developed in the thermal-vacuum area. These include the exposure to extreme temperatures, temperature cycling, thermal-balance testing and thermal-vacuum testing.
Space telescope observatory management system preliminary test and verification plan
NASA Technical Reports Server (NTRS)
Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.
1982-01-01
The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.
Foo Kune, Denis [Saint Paul, MN; Mahadevan, Karthikeyan [Mountain View, CA
2011-01-25
A recursive verification protocol to reduce the time variance due to delays in the network by putting the subject node at most one hop from the verifier node provides for an efficient manner to test wireless sensor nodes. Since the software signatures are time based, recursive testing will give a much cleaner signal for positive verification of the software running on any one node in the sensor network. In this protocol, the main verifier checks its neighbor, who in turn checks its neighbor, and continuing this process until all nodes have been verified. This ensures minimum time delays for the software verification. Should a node fail the test, the software verification downstream is halted until an alternative path (one not including the failed node) is found. Utilizing techniques well known in the art, having a node tested twice, or not at all, can be avoided.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, K.H.; Pellerin, L.; Becker, A.
1998-06-01
'Non-invasive, high-resolution imaging of the shallow subsurface is needed for delineation of buried waste, detection of unexploded ordinance, verification and monitoring of containment structures, and other environmental applications. Electromagnetic measurements at frequencies between 1 and 100 MHz are important for such applications, because the induction number of many targets is small due, and the ability to determine the dielectric permittivity in addition to electrical conductivity of the subsurface is possible. Earlier workers were successful in developing systems for detecting anomalous areas, but no quantifiable information was accurately determined. For high resolution imaging, accurate measurements are necessary so the field datamore » can be mapped into the space of the subsurface parameters. The authors are developing a non-invasive method for accurately imaging the electrical conductivity and dielectric permittivity of the shallow subsurface using the plane wave impedance approach, known as the magnetotelluric (MT) method at low frequencies. Electric and magnetic sensors are being tested in a known area against theoretical predictions, thereby insuring that the data collected with the high-frequency impedance (HFI) system will support high-resolution, multi-dimensional imaging techniques. The summary of the work to date is divided into three sections: equipment procurement, instrumentation, and theoretical developments. For most earth materials, the frequency range from 1 to 100 MHz encompasses a very difficult transition zone between the wave propagation of displacement currents and the diffusive behavior of conduction currents. Test equipment, such as signal generators and amplifiers, does not cover the entire range except at great expense. Hence the authors have divided the range of investigation into three sub-ranges: 1--10 MHz, 10--30 MHz, and 30--100 MHz. Results to date are in the lowest frequency range of 1--10 MHz. Even though conduction currents dominate in this range, as in traditional electromagnetic exploration methods, little work has been done by the geophysical community above 500 kHz.'« less
Orbit attitude processor. STS-1 bench program verification test plan
NASA Technical Reports Server (NTRS)
Mcclain, C. R.
1980-01-01
A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.
40 CFR 1065.372 - NDUV analyzer HC and H2O interference verification.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Nox and N2o... recommend that you extract engine exhaust to perform this verification. Use a CLD that meets the..., if one is used during testing, introduce the engine exhaust to the NDUV analyzer. (4) Allow time for...
40 CFR 1065.372 - NDUV analyzer HC and H2O interference verification.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Nox and N2o... recommend that you extract engine exhaust to perform this verification. Use a CLD that meets the..., if one is used during testing, introduce the engine exhaust to the NDUV analyzer. (4) Allow time for...
40 CFR 1065.372 - NDUV analyzer HC and H2O interference verification.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Nox and N2o... recommend that you extract engine exhaust to perform this verification. Use a CLD that meets the..., if one is used during testing, introduce the engine exhaust to the NDUV analyzer. (4) Allow time for...
40 CFR 1065.372 - NDUV analyzer HC and H2O interference verification.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Calibrations and Verifications Nox and N2o... recommend that you extract engine exhaust to perform this verification. Use a CLD that meets the..., if one is used during testing, introduce the engine exhaust to the NDUV analyzer. (4) Allow time for...
This generic verification protocol provides a detailed method for conducting and reporting results from verification testing of pesticide application technologies. It can be used to evaluate technologies for their potential to reduce spray drift, hence the term “drift reduction t...
47 CFR 87.147 - Authorization of equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... follows: 90-110 kHz 190-285 kHz 325-435 kHz 74.800 MHz to 75.200 MHz 108.000 MHz to 137.000 MHz 328.600....250 GHz 31.800 GHz to 33.400 GHz (e) Verification reports for ELTs capable of operating on the...
47 CFR 87.147 - Authorization of equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... follows: 90-110 kHz 190-285 kHz 325-435 kHz 74.800 MHz to 75.200 MHz 108.000 MHz to 137.000 MHz 328.600....250 GHz 31.800 GHz to 33.400 GHz (e) Verification reports for ELTs capable of operating on the...
47 CFR 87.147 - Authorization of equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... follows: 90-110 kHz 190-285 kHz 325-435 kHz 74.800 MHz to 75.200 MHz 108.000 MHz to 137.000 MHz 328.600....250 GHz 31.800 GHz to 33.400 GHz (e) Verification reports for ELTs capable of operating on the...
47 CFR 87.147 - Authorization of equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... follows: 90-110 kHz 190-285 kHz 325-435 kHz 74.800 MHz to 75.200 MHz 108.000 MHz to 137.000 MHz 328.600....250 GHz 31.800 GHz to 33.400 GHz (e) Verification reports for ELTs capable of operating on the...
EPA has created the Environmental Technology Verification Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. The Air Pollution Control Technology Verification Center, a cente...
40 CFR 1066.240 - Torque transducer verification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.240 Torque transducer verification. Verify torque-measurement systems by performing the verifications described in §§ 1066.270 and... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Torque transducer verification. 1066...
NASA Astrophysics Data System (ADS)
Acero, R.; Santolaria, J.; Pueo, M.; Aguilar, J. J.; Brau, A.
2015-11-01
High-range measuring equipment like laser trackers need large dimension calibrated reference artifacts in their calibration and verification procedures. In this paper, a new verification procedure for portable coordinate measuring instruments based on the generation and evaluation of virtual distances with an indexed metrology platform is developed. This methodology enables the definition of an unlimited number of reference distances without materializing them in a physical gauge to be used as a reference. The generation of the virtual points and reference lengths derived is linked to the concept of the indexed metrology platform and the knowledge of the relative position and orientation of its upper and lower platforms with high accuracy. It is the measuring instrument together with the indexed metrology platform one that remains still, rotating the virtual mesh around them. As a first step, the virtual distances technique is applied to a laser tracker in this work. The experimental verification procedure of the laser tracker with virtual distances is simulated and further compared with the conventional verification procedure of the laser tracker with the indexed metrology platform. The results obtained in terms of volumetric performance of the laser tracker proved the suitability of the virtual distances methodology in calibration and verification procedures for portable coordinate measuring instruments, broadening and expanding the possibilities for the definition of reference distances in these procedures.
General Dynamic (GD) Launch Waveform On-Orbit Performance Report
NASA Technical Reports Server (NTRS)
Briones, Janette C.; Shalkhauser, Mary Jo
2014-01-01
The purpose of this report is to present the results from the GD SDR on-orbit performance testing using the launch waveform over TDRSS. The tests include the evaluation of well-tested waveform modes, the operation of RF links that are expected to have high margins, the verification of forward return link operation (including full duplex), the verification of non-coherent operational models, and the verification of radio at-launch operational frequencies. This report also outlines the launch waveform tests conducted and comparisons to the results obtained from ground testing.
EGSE customization for the Euclid NISP Instrument AIV/AIT activities
NASA Astrophysics Data System (ADS)
Franceschi, E.; Trifoglio, M.; Gianotti, F.; Conforti, V.; Andersen, J. J.; Stephen, J. B.; Valenziano, L.; Auricchio, N.; Bulgarelli, A.; De Rosa, A.; Fioretti, V.; Maiorano, E.; Morgante, G.; Nicastro, L.; Sortino, F.; Zoli, A.; Balestra, A.; Bonino, D.; Bonoli, C.; Bortoletto, F.; Capobianco, V.; Corcione, L.; Dal Corso, F.; Debei, S.; Di Ferdinando, D.; Dusini, S.; Farinelli, R.; Fornari, F.; Giacomini, F.; Guizzo, G. P.; Laudisio, F.; Ligori, S.; Mauri, N.; Medinaceli, E.; Patrizii, L.; Sirignano, C.; Sirri, G.; Stanco, L.; Tenti, M.; Valieri, C.; Ventura, S.
2016-07-01
The Near Infrared Spectro-Photometer (NISP) on board the Euclid ESA mission will be developed and tested at various levels of integration by using various test equipment. The Electrical Ground Support Equipment (EGSE) shall be required to support the assembly, integration, verification and testing (AIV/AIT) and calibration activities at instrument level before delivery to ESA, and at satellite level, when the NISP instrument is mounted on the spacecraft. In the case of the Euclid mission this EGSE will be provided by ESA to NISP team, in the HW/SW framework called "CCS Lite", with a possible first usage already during the Warm Electronics (WE) AIV/AIT activities. In this paper we discuss how we will customize that "CCS Lite" as required to support both the WE and Instrument test activities. This customization will primarily involve building the NISP Mission Information Base (the CCS MIB tables) by gathering the relevant data from the instrument sub-units and validating these inputs through specific tools. Secondarily, it will imply developing a suitable set of test sequences, by using uTOPE (an extension to the TCL scripting language, included in the CCS framework), in order to implement the foreseen test procedures. In addition and in parallel, custom interfaces shall be set up between the CCS and the NI-IWS (the NISP Instrument Workstation, which will be in use at any level starting from the WE activities), and also between the CCS and the TCC (the Telescope Control and command Computer, to be only and specifically used during the instrument level tests).
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the KSC Shuttle Landing Facility, the Italian Space Agency's Multi- Purpose Logistics Module Donatello begins rolling out of the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the KSC Shuttle Landing Facility, an Airbus '''Beluga''' air cargo plane opens to reveal its cargo, the Italian Space Agency's Multi- Purpose Logistics Module Donatello, from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the KSC Shuttle Landing Facility, the Italian Space Agency's Multi- Purpose Logistics Module Donatello rolls out of the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
NASA Technical Reports Server (NTRS)
Kashangaki, Thomas A. L.
1992-01-01
This paper describes a series of modal tests that were performed on a cantilevered truss structure. The goal of the tests was to assemble a large database of high quality modal test data for use in verification of proposed methods for on orbit model verification and damage detection in flexible truss structures. A description of the hardware is provided along with details of the experimental setup and procedures for 16 damage cases. Results from selected cases are presented and discussed. Differences between ground vibration testing and on orbit modal testing are also described.
Verification and Validation Studies for the LAVA CFD Solver
NASA Technical Reports Server (NTRS)
Moini-Yekta, Shayan; Barad, Michael F; Sozer, Emre; Brehm, Christoph; Housman, Jeffrey A.; Kiris, Cetin C.
2013-01-01
The verification and validation of the Launch Ascent and Vehicle Aerodynamics (LAVA) computational fluid dynamics (CFD) solver is presented. A modern strategy for verification and validation is described incorporating verification tests, validation benchmarks, continuous integration and version control methods for automated testing in a collaborative development environment. The purpose of the approach is to integrate the verification and validation process into the development of the solver and improve productivity. This paper uses the Method of Manufactured Solutions (MMS) for the verification of 2D Euler equations, 3D Navier-Stokes equations as well as turbulence models. A method for systematic refinement of unstructured grids is also presented. Verification using inviscid vortex propagation and flow over a flat plate is highlighted. Simulation results using laminar and turbulent flow past a NACA 0012 airfoil and ONERA M6 wing are validated against experimental and numerical data.
Ada(R) Test and Verification System (ATVS)
NASA Technical Reports Server (NTRS)
Strelich, Tom
1986-01-01
The Ada Test and Verification System (ATVS) functional description and high level design are completed and summarized. The ATVS will provide a comprehensive set of test and verification capabilities specifically addressing the features of the Ada language, support for embedded system development, distributed environments, and advanced user interface capabilities. Its design emphasis was on effective software development environment integration and flexibility to ensure its long-term use in the Ada software development community.
Integrated testing and verification system for research flight software
NASA Technical Reports Server (NTRS)
Taylor, R. N.
1979-01-01
The MUST (Multipurpose User-oriented Software Technology) program is being developed to cut the cost of producing research flight software through a system of software support tools. An integrated verification and testing capability was designed as part of MUST. Documentation, verification and test options are provided with special attention on real-time, multiprocessing issues. The needs of the entire software production cycle were considered, with effective management and reduced lifecycle costs as foremost goals.
Verification testing of the Aquionics, Inc. bersonInLine® 4250 UV System to develop the UV delivered dose flow relationship was conducted at the Parsippany-Troy Hills Wastewater Treatment Plant test site in Parsippany, New Jersey. Two full-scale reactors were mounted in series. T...
A Framework for Evidence-Based Licensure of Adaptive Autonomous Systems
2016-03-01
insights gleaned to DoD. The autonomy community has identified significant challenges associated with test, evaluation verification and validation of...licensure as a test, evaluation, verification , and validation (TEVV) framework that can address these challenges. IDA found that traditional...language requirements to testable (preferably machine testable) specifications • Design of architectures that treat development and verification of
Verification testing of the Ondeo Degremont, Inc. Aquaray® 40 HO VLS Disinfection System to develop the UV delivered dose flow relationship was conducted at the Parsippany-Troy Hills wastewater treatment plant test site in Parsippany, New Jersey. Three reactor modules were m...
NASA Technical Reports Server (NTRS)
Windley, P. J.
1991-01-01
In this paper we explore the specification and verification of VLSI designs. The paper focuses on abstract specification and verification of functionality using mathematical logic as opposed to low-level boolean equivalence verification such as that done using BDD's and Model Checking. Specification and verification, sometimes called formal methods, is one tool for increasing computer dependability in the face of an exponentially increasing testing effort.
Digital conversion of INEL archeological data using ARC/INFO and Oracle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, R.D.; Brizzee, J.; White, L.
1993-11-04
This report documents the procedures used to convert archaeological data for the INEL to digital format, lists the equipment used, and explains the verification and validation steps taken to check data entry. It also details the production of an engineered interface between ARC/INFO and Oracle.
49 CFR Appendix A to Part 230 - Inspection Requirements
Code of Federal Regulations, 2010 CFR
2010-10-01
... compressor(s) and governor to ascertain proper operation.* 9. Inspection of brake and signal equipment.* 10... of main reservoir and brake cylinder leakage. 6. Entering and inspection of tender tank interior... of boiler. 5. Thickness verification of dry pipes. 6. Smoke box inspection. 7. Main reservoir hammer...
NASA Astrophysics Data System (ADS)
Zamani, K.; Bombardelli, F. A.
2013-12-01
ADR equation describes many physical phenomena of interest in the field of water quality in natural streams and groundwater. In many cases such as: density driven flow, multiphase reactive transport, and sediment transport, either one or a number of terms in the ADR equation may become nonlinear. For that reason, numerical tools are the only practical choice to solve these PDEs. All numerical solvers developed for transport equation need to undergo code verification procedure before they are put in to practice. Code verification is a mathematical activity to uncover failures and check for rigorous discretization of PDEs and implementation of initial/boundary conditions. In the context computational PDE verification is not a well-defined procedure on a clear path. Thus, verification tests should be designed and implemented with in-depth knowledge of numerical algorithms and physics of the phenomena as well as mathematical behavior of the solution. Even test results need to be mathematically analyzed to distinguish between an inherent limitation of algorithm and a coding error. Therefore, it is well known that code verification is a state of the art, in which innovative methods and case-based tricks are very common. This study presents full verification of a general transport code. To that end, a complete test suite is designed to probe the ADR solver comprehensively and discover all possible imperfections. In this study we convey our experiences in finding several errors which were not detectable with routine verification techniques. We developed a test suit including hundreds of unit tests and system tests. The test package has gradual increment in complexity such that tests start from simple and increase to the most sophisticated level. Appropriate verification metrics are defined for the required capabilities of the solver as follows: mass conservation, convergence order, capabilities in handling stiff problems, nonnegative concentration, shape preservation, and spurious wiggles. Thereby, we provide objective, quantitative values as opposed to subjective qualitative descriptions as 'weak' or 'satisfactory' agreement with those metrics. We start testing from a simple case of unidirectional advection, then bidirectional advection and tidal flow and build up to nonlinear cases. We design tests to check nonlinearity in velocity, dispersivity and reactions. For all of the mentioned cases we conduct mesh convergence tests. These tests compare the results' order of accuracy versus the formal order of accuracy of discretization. The concealing effect of scales (Peclet and Damkohler numbers) on the mesh convergence study and appropriate remedies are also discussed. For the cases in which the appropriate benchmarks for mesh convergence study are not available we utilize Symmetry, Complete Richardson Extrapolation and Method of False Injection to uncover bugs. Detailed discussions of capabilities of the mentioned code verification techniques are given. Auxiliary subroutines for automation of the test suit and report generation are designed. All in all, the test package is not only a robust tool for code verification but also it provides comprehensive insight on the ADR solvers capabilities. Such information is essential for any rigorous computational modeling of ADR equation for surface/subsurface pollution transport.
In-line verification of linewidth uniformity for 0.18 and below: design rule reticles
NASA Astrophysics Data System (ADS)
Tan, TaiSheng; Kuo, Shen C.; Wu, Clare; Falah, Reuven; Hemar, Shirley; Sade, Amikam; Gottlib, Gidon
2000-07-01
Mask making process development and control is addressed using a reticle inspection tool equipped with the new revolutionized application called LBM-Linewidth Bias Monitoring. In order to use the LBM for mask-making process control, procedures and corresponding test plates are a developed, such that routine monitoring of the manufacturing process discloses process variation and machine variation. At the same time systematic variation are studied and either taken care of or taken into consideration to allow successful production line work. In this paper the contribution of the LBM for mask quality monitoring is studied with respect to dense layers, e.g. DRAM. Another aspect of this application - the detection of very small CD mis-uniformity areas is discussed.
A Module Experimental Process System Development Unit (MEPSDU)
NASA Technical Reports Server (NTRS)
1981-01-01
The purpose of this program is to demonstrate the technical readiness of a cost effective process sequence that has the potential for the production of flat plate photovoltaic modules which met the price goal in 1986 of $.70 or less per watt peak. Program efforts included: preliminary design review, preliminary cell fabrication using the proposed process sequence, verification of sandblasting back cleanup, study of resist parameters, evaluation of pull strength of the proposed metallization, measurement of contact resistance of Electroless Ni contacts, optimization of process parameter, design of the MEPSDU module, identification and testing of insulator tapes, development of a lamination process sequence, identification, discussions, demonstrations and visits with candidate equipment vendors, evaluation of proposals for tabbing and stringing machine.
An Integrated Unix-based CAD System for the Design and Testing of Custom VLSI Chips
NASA Technical Reports Server (NTRS)
Deutsch, L. J.
1985-01-01
A computer aided design (CAD) system that is being used at the Jet Propulsion Laboratory for the design of custom and semicustom very large scale integrated (VLSI) chips is described. The system consists of a Digital Equipment Corporation VAX computer with the UNIX operating system and a collection of software tools for the layout, simulation, and verification of microcircuits. Most of these tools were written by the academic community and are, therefore, available to JPL at little or no cost. Some small pieces of software have been written in-house in order to make all the tools interact with each other with a minimal amount of effort on the part of the designer.
1999-02-11
KENNEDY SPACE CENTER, FLA. -- In the SPACEHAB Facility, the STS-96 crew looks at equipment as part of a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station . From left are Mission Specialist Ellen Ochoa (behind the opened storage cover ), Commander Kent Rominger, Pilot Rick Husband (holding a lithium hydroxide canister) and Mission Specialists Dan Barry, Valery Tokarev of Russia and Julie Payette. In the background is TTI interpreter Valentina Maydell. The other crew member at KSC for the IVT is Mission Specialist Tamara Jernigan. Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m
1999-02-11
KENNEDY SPACE CENTER, FLA. -- In the SPACEHAB Facility, STS-96 Mission Specialist Valery Tokarev of Russia (left) and Commander Kent Rominger (second from right) listen to Lynn Ashby (far right), with JSC, talking about the SPACEHAB equipment in front of them during a payload Interface Verification Test (IVT). In the background behind Tokarev is TTI interpreter Valentina Maydell. Other STS-96 crew members at KSC for the IVT are Pilot Rick Husband and Mission Specialists Dan Barry, Ellen Ochoa, Tamara Jernigan and Julie Payette. Mission STS-96 carries the SPACEHAB Logistics Double Module, which will have equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. It carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m
Verification of component mode techniques for flexible multibody systems
NASA Technical Reports Server (NTRS)
Wiens, Gloria J.
1990-01-01
Investigations were conducted in the modeling aspects of flexible multibodies undergoing large angular displacements. Models were to be generated and analyzed through application of computer simulation packages employing the 'component mode synthesis' techniques. Multibody Modeling, Verification and Control Laboratory (MMVC) plan was implemented, which includes running experimental tests on flexible multibody test articles. From these tests, data was to be collected for later correlation and verification of the theoretical results predicted by the modeling and simulation process.
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
Improved Biomass Cooking Stoves and Improved Stove Emission Equipment
DOE Office of Scientific and Technical Information (OSTI.GOV)
HATFIELD, MICHAEL; Still, Dean
2013-04-15
In developing countries, there is an urgent need for access to safe, efficient, and more affordable cooking technologies. Nearly 2.5 billion people currently use an open fire or traditional cookstove to prepare their meals, and recent models predict that use of biomass for cooking will continue to be the dominant energy use in rural, resource-poor households through 2030. For these families, cooking poses serious risks to health, safety, and income. An alarming 4 million people, primarily women and children, die prematurely each year from indoor and outdoor exposure to the harmful emissions released by solid fuel combustion. Use of traditionalmore » stoves can also have a significant impact on deforestation and climate change. This dire situation creates a critical need for cookstoves that significantly and verifiably reduce fuel use and emissions in order to reach protective levels for human health and the environment. Additionally, advances in the scientific equipment needed to measure and monitor stove fuel use and emissions have not kept pace with the significant need within the industry. While several testing centers in the developed world may have hundred thousand-dollar emissions testing systems, organizations in the field have had little more than a thermometer, a scale, and subjective observations to quantify the performance of stove designs. There is an urgent need for easy-to-use, inexpensive, accurate, and robust stove testing equipment for use by laboratory and field researchers around the world. ASAT and their research partner, Aprovecho Research Center (ARC), have over thirty years of experience addressing these two needs, improved cookstoves and emissions monitoring equipment, with expertise spanning the full spectrum of development from conceptual design to product manufacturing and dissemination. This includes: 1) research, design, and verification of clean biomass cookstove technology and emissions monitoring equipment; 2) mass production of quality-controlled stove and emissions equipment at levels scalable to meet global demand; and 3) global distribution through a variety of channels and partners. ARC has been instrumental in designing and improving more than 100 stove designs over the past thirty years. In the last four years, ASAT and ARC have played a key role in the production and sales of over 200,000 improved stoves in the developed and developing world. The ARC-designed emissions equipment is currently used by researchers in laboratories and field studies on five continents. During Phase I of the DOE STTR grant, ASAT and ARC worked together to apply their wealth of product development experience towards creating the next generation of improved cookstoves and emissions monitoring equipment. Highlights of Phase I for the biomass cookstove project include 1) the development of several new stove technologies that reached the DOE 50/90 benchmark; 2) fabrication of new stove prototypes by ASAT’s manufacturing partner, Shengzhou Stove Manufacturing (SSM); 3) field testing of prototype stoves with consumers in Puerto Rico and the US; and 4) the selection of three stove prototypes for further development and commercialization during Phase II. Highlights of Phase I for the emissions monitoring equipment project include: 1) creation of a new emissions monitoring equipment product, the Laboratory Emissions Monitoring System (LEMS 2) the addition of gravimetric PM measurements to the stove testing systems to meet International Standards Organization criteria; 3) the addition of a CO{sub 2} sensor and wireless 3G capability to the IAP Meter; and 4) and the improvement of sensors and signal quality on all systems. Twelve Regional Testing and Knowledge Centers purchased this equipment during the Phase I project period.« less
The U.S. Environmental Protection Agency established the Environmental Technology Verification Program to accelerate the development and commercialization of improved environmental technology through third party verification and reporting of product performance. Research Triangl...
Simulation environment based on the Universal Verification Methodology
NASA Astrophysics Data System (ADS)
Fiergolski, A.
2017-01-01
Universal Verification Methodology (UVM) is a standardized approach of verifying integrated circuit designs, targeting a Coverage-Driven Verification (CDV). It combines automatic test generation, self-checking testbenches, and coverage metrics to indicate progress in the design verification. The flow of the CDV differs from the traditional directed-testing approach. With the CDV, a testbench developer, by setting the verification goals, starts with an structured plan. Those goals are targeted further by a developed testbench, which generates legal stimuli and sends them to a device under test (DUT). The progress is measured by coverage monitors added to the simulation environment. In this way, the non-exercised functionality can be identified. Moreover, the additional scoreboards indicate undesired DUT behaviour. Such verification environments were developed for three recent ASIC and FPGA projects which have successfully implemented the new work-flow: (1) the CLICpix2 65 nm CMOS hybrid pixel readout ASIC design; (2) the C3PD 180 nm HV-CMOS active sensor ASIC design; (3) the FPGA-based DAQ system of the CLICpix chip. This paper, based on the experience from the above projects, introduces briefly UVM and presents a set of tips and advices applicable at different stages of the verification process-cycle.
RELAP5-3D Resolution of Known Restart/Backup Issues
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mesina, George L.; Anderson, Nolan A.
2014-12-01
The state-of-the-art nuclear reactor system safety analysis computer program developed at the Idaho National Laboratory (INL), RELAP5-3D, continues to adapt to changes in computer hardware and software and to develop to meet the ever-expanding needs of the nuclear industry. To continue at the forefront, code testing must evolve with both code and industry developments, and it must work correctly. To best ensure this, the processes of Software Verification and Validation (V&V) are applied. Verification compares coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions. A form of this, sequentialmore » verification, checks code specifications against coding only when originally written then applies regression testing which compares code calculations between consecutive updates or versions on a set of test cases to check that the performance does not change. A sequential verification testing system was specially constructed for RELAP5-3D to both detect errors with extreme accuracy and cover all nuclear-plant-relevant code features. Detection is provided through a “verification file” that records double precision sums of key variables. Coverage is provided by a test suite of input decks that exercise code features and capabilities necessary to model a nuclear power plant. A matrix of test features and short-running cases that exercise them is presented. This testing system is used to test base cases (called null testing) as well as restart and backup cases. It can test RELAP5-3D performance in both standalone and coupled (through PVM to other codes) runs. Application of verification testing revealed numerous restart and backup issues in both standalone and couple modes. This document reports the resolution of these issues.« less
Integration and verification testing of the Large Synoptic Survey Telescope camera
NASA Astrophysics Data System (ADS)
Lange, Travis; Bond, Tim; Chiang, James; Gilmore, Kirk; Digel, Seth; Dubois, Richard; Glanzman, Tom; Johnson, Tony; Lopez, Margaux; Newbry, Scott P.; Nordby, Martin E.; Rasmussen, Andrew P.; Reil, Kevin A.; Roodman, Aaron J.
2016-08-01
We present an overview of the Integration and Verification Testing activities of the Large Synoptic Survey Telescope (LSST) Camera at the SLAC National Accelerator Lab (SLAC). The LSST Camera, the sole instrument for LSST and under construction now, is comprised of a 3.2 Giga-pixel imager and a three element corrector with a 3.5 degree diameter field of view. LSST Camera Integration and Test will be taking place over the next four years, with final delivery to the LSST observatory anticipated in early 2020. We outline the planning for Integration and Test, describe some of the key verification hardware systems being developed, and identify some of the more complicated assembly/integration activities. Specific details of integration and verification hardware systems will be discussed, highlighting some of the technical challenges anticipated.
Implementation and verification of global optimization benchmark problems
NASA Astrophysics Data System (ADS)
Posypkin, Mikhail; Usov, Alexander
2017-12-01
The paper considers the implementation and verification of a test suite containing 150 benchmarks for global deterministic box-constrained optimization. A C++ library for describing standard mathematical expressions was developed for this purpose. The library automate the process of generating the value of a function and its' gradient at a given point and the interval estimates of a function and its' gradient on a given box using a single description. Based on this functionality, we have developed a collection of tests for an automatic verification of the proposed benchmarks. The verification has shown that literary sources contain mistakes in the benchmarks description. The library and the test suite are available for download and can be used freely.
Solar array flight dynamic experiment
NASA Technical Reports Server (NTRS)
Schock, R. W.
1986-01-01
The purpose of the Solar Array Flight Dynamic Experiment (SAFDE) is to demonstrate the feasibility of on-orbit measurement and ground processing of large space structures dynamic characteristics. Test definition or verification provides the dynamic characteristic accuracy required for control systems use. An illumination/measurement system was developed to fly on space shuttle flight STS-31D. The system was designed to dynamically evaluate a large solar array called the Solar Array Flight Experiment (SAFE) that had been scheduled for this flight. The SAFDE system consisted of a set of laser diode illuminators, retroreflective targets, an intelligent star tracker receiver and the associated equipment to power, condition, and record the results. In six tests on STS-41D, data was successfully acquired from 18 retroreflector targets and ground processed, post flight, to define the solar array's dynamic characteristic. The flight experiment proved the viability of on-orbit test definition of large space structures dynamic characteristics. Future large space structures controllability should be greatly enhanced by this capability.
Solar array flight dynamic experiment
NASA Technical Reports Server (NTRS)
Schock, Richard W.
1986-01-01
The purpose of the Solar Array Flight Dynamic Experiment (SAFDE) is to demonstrate the feasibility of on-orbit measurement and ground processing of large space structures dynamic characteristics. Test definition or verification provides the dynamic characteristic accuracy required for control systems use. An illumination/measurement system was developed to fly on Space Shuttle flight STS-31D. The system was designed to dynamically evaluate a large solar array called the Solar Array Flight Experiment (SAFE) that had been scheduled for this flight. The SAFDE system consisted of a set of laser diode illuminators, retroreflective targets, an intelligent star tracker receiver and the associated equipment to power, condition, and record the results. In six tests on STS-41D, data was successfully acquired from 18 retroreflector targets and ground processed, post flight, to define the solar array's dynamic characteristic. The flight experiment proved the viability of on-orbit test definition of large space structures dynamic characteristics. Future large space structures controllability should be greatly enhanced by this capability.
Solar array flight dynamic experiment
NASA Technical Reports Server (NTRS)
Schock, Richard W.
1987-01-01
The purpose of the Solar Array Flight Dynamic Experiment (SAFDE) is to demonstrate the feasibility of on-orbit measurement and ground processing of large space structures' dynamic characteristics. Test definition or verification provides the dynamic characteristic accuracy required for control systems use. An illumination/measurement system was developed to fly on space shuttle flight STS-41D. The system was designed to dynamically evaluate a large solar array called the Solar Array Flight Experiment (SAFE) that had been scheduled for this flight. The SAFDE system consisted of a set of laser diode illuminators, retroreflective targets, an intelligent star tracker receiver and the associated equipment to power, condition, and record the results. In six tests on STS-41D, data was successfully acquired from 18 retroreflector targets and ground processed, post flight, to define the solar array's dynamic characteristic. The flight experiment proved the viability of on-orbit test definition of large space structures dynamic characteristics. Future large space structures controllability should be greatly enhanced by this capability.
A collection of articles on S/X-band experiment zero delay ranging tests, volume 1
NASA Technical Reports Server (NTRS)
Otoshi, T. Y. (Editor)
1975-01-01
Articles are presented which are concerned with the development of special test equipment and a dual-frequency zero delay device (ZDD) that were required for range tests and the measurement of ground station delays for the Mariner-Venus-Mercury 1973 S/X-band experiment. Test data obtained at DSS 14 after installation of the ZDD on the 64-m antenna are given. It is shown that large variations of range were observed as a function of antenna elevation angle and were sensitive to antenna location. A ranging calibration configuration that was subsequently developed and a technique for determining the appropriate Z-correction are described. Zero delay test data at DSS 14 during the Mariner 10 Venus-Mercury-Encounter periods (1974 days 12-150) are presented. The theoretical analysis and experimental verifications are included of the effects of multipath and effects of discontinuities on range delay measurements. A movable subreflector technique and the multipath theory were used to isolate principal multipath errors on the 64-m antenna and to enable a more accurate determination of the actual ground station range delay.
40 CFR 1065.372 - NDUV analyzer HC and H2O interference verification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... compensation algorithms that utilize measurements of other gases to meet this interference verification, simultaneously conduct such measurements to test the algorithms during the analyzer interference verification. (c...
An engineering methodology for implementing and testing VLSI (Very Large Scale Integrated) circuits
NASA Astrophysics Data System (ADS)
Corliss, Walter F., II
1989-03-01
The engineering methodology for producing a fully tested VLSI chip from a design layout is presented. A 16-bit correlator, NPS CORN88, that was previously designed, was used as a vehicle to demonstrate this methodology. The study of the design and simulation tools, MAGIC and MOSSIM II, was the focus of the design and validation process. The design was then implemented and the chip was fabricated by MOSIS. This fabricated chip was then used to develop a testing methodology for using the digital test facilities at NPS. NPS CORN88 was the first full custom VLSI chip, designed at NPS, to be tested with the NPS digital analysis system, Tektronix DAS 9100 series tester. The capabilities and limitations of these test facilities are examined. NPS CORN88 test results are included to demonstrate the capabilities of the digital test system. A translator, MOS2DAS, was developed to convert the MOSSIM II simulation program to the input files required by the DAS 9100 device verification software, 91DVS. Finally, a tutorial for using the digital test facilities, including the DAS 9100 and associated support equipments, is included as an appendix.
Idaho out-of-service verification field operational test
DOT National Transportation Integrated Search
2000-02-01
The Out-of-Service Verification Field Operational Test Project was initiated in 1994. The purpose of the project was to test the feasibility of using sensors and a computerized tracking system to augment the ability of inspectors to monitor and contr...
Fabrication and verification testing of ETM 30 cm diameter ion thrusters
NASA Technical Reports Server (NTRS)
Collett, C.
1977-01-01
Engineering model designs and acceptance tests are described for the 800 and 900 series 30 cm electron bombardment thrustors. Modifications to the test console for a 1000 hr verification test were made. The 10,000 hr endurance test of the S/N 701 thruster is described, and post test analysis results are included.
Cyanide can be present in various forms in water. The cyanide test kit evaluated in this verification study (Industrial Test System, Inc. Cyanide Regent Strip ™ Test Kit) was designed to detect free cyanide in water. This is done by converting cyanide in water to cyanogen...
NASA Technical Reports Server (NTRS)
Feng, C.; Sun, X.; Shen, Y. N.; Lombardi, Fabrizio
1992-01-01
This paper covers the verification and protocol validation for distributed computer and communication systems using a computer aided testing approach. Validation and verification make up the so-called process of conformance testing. Protocol applications which pass conformance testing are then checked to see whether they can operate together. This is referred to as interoperability testing. A new comprehensive approach to protocol testing is presented which address: (1) modeling for inter-layer representation for compatibility between conformance and interoperability testing; (2) computational improvement to current testing methods by using the proposed model inclusive of formulation of new qualitative and quantitative measures and time-dependent behavior; (3) analysis and evaluation of protocol behavior for interactive testing without extensive simulation.
Environmental Testing Campaign and Verification of Satellite Deimos-2 at INTA
NASA Astrophysics Data System (ADS)
Hernandez, Daniel; Vazquez, Mercedes; Anon, Manuel; Olivo, Esperanza; Gallego, Pablo; Morillo, Pablo; Parra, Javier; Capraro; Luengo, Mar; Garcia, Beatriz; Villacorta, Pablo
2014-06-01
In this paper the environmental test campaign and verification of the DEIMOS-2 (DM2) satellite will be presented and described. DM2 will be ready for launch in 2014.Firstly, a short description of the satellite is presented, including its physical characteristics and intended optical performances. DEIMOS-2 is a LEO satellite for earth observation that will provide high resolution imaging services for agriculture, civil protection, environmental issues, disasters monitoring, climate change, urban planning, cartography, security and intelligence.Then, the verification and test campaign carried out on the SM and FM models at INTA is described; including Mechanical test for the SM and Climatic, Mechanical and Electromagnetic Compatibility tests for the FM. In addition, this paper includes Centre of Gravity and Moment of Inertia measurements for both models, and other verification activities carried out in order to ensure satellite's health during launch and its in orbit performance.
Results from an Independent View on The Validation of Safety-Critical Space Systems
NASA Astrophysics Data System (ADS)
Silva, N.; Lopes, R.; Esper, A.; Barbosa, R.
2013-08-01
The Independent verification and validation (IV&V) has been a key process for decades, and is considered in several international standards. One of the activities described in the “ESA ISVV Guide” is the independent test verification (stated as Integration/Unit Test Procedures and Test Data Verification). This activity is commonly overlooked since customers do not really see the added value of checking thoroughly the validation team work (could be seen as testing the tester's work). This article presents the consolidated results of a large set of independent test verification activities, including the main difficulties, results obtained and advantages/disadvantages for the industry of these activities. This study will support customers in opting-in or opting-out for this task in future IV&V contracts since we provide concrete results from real case studies in the space embedded systems domain.
Details on the verification test design, measurement test procedures, and Quality assurance/Quality Control (QA/QC) procedures can be found in the test plan titled Testing and Quality Assurance Plan, MIRATECH Corporation GECO 3100 Air/Fuel Ratio Controller (SRI 2001). It can be d...
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round
Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round. Changes reflect performance of second round of testing at new location and with various changes to personnel. Additional changes reflect general improvements to the Version 1 test/QA...
Code of Federal Regulations, 2010 CFR
2010-01-01
... CERTIFICATION POST-MORTEM INSPECTION § 310.25 Contamination with microorganisms; process control verification... testing. (1) Each official establishment that slaughters livestock must test for Escherichia coli Biotype... poultry, shall test the type of livestock or poultry slaughtered in the greatest number. The establishment...
Code of Federal Regulations, 2014 CFR
2014-01-01
... CERTIFICATION POST-MORTEM INSPECTION § 310.25 Contamination with microorganisms; process control verification... testing. (1) Each official establishment that slaughters livestock must test for Escherichia coli Biotype... poultry, shall test the type of livestock or poultry slaughtered in the greatest number. The establishment...
Code of Federal Regulations, 2013 CFR
2013-01-01
... CERTIFICATION POST-MORTEM INSPECTION § 310.25 Contamination with microorganisms; process control verification... testing. (1) Each official establishment that slaughters livestock must test for Escherichia coli Biotype... poultry, shall test the type of livestock or poultry slaughtered in the greatest number. The establishment...
Code of Federal Regulations, 2012 CFR
2012-01-01
... CERTIFICATION POST-MORTEM INSPECTION § 310.25 Contamination with microorganisms; process control verification... testing. (1) Each official establishment that slaughters livestock must test for Escherichia coli Biotype... poultry, shall test the type of livestock or poultry slaughtered in the greatest number. The establishment...
Code of Federal Regulations, 2011 CFR
2011-01-01
... CERTIFICATION POST-MORTEM INSPECTION § 310.25 Contamination with microorganisms; process control verification... testing. (1) Each official establishment that slaughters livestock must test for Escherichia coli Biotype... poultry, shall test the type of livestock or poultry slaughtered in the greatest number. The establishment...
Built-in-Test Verification Techniques
1987-02-01
report documents the results of the effort for the Rome Air Development Center Contract F30602-84-C-0021, BIT Verification Techniques. The work was...Richard Spillman of Sp.,llman Research Associates. The principal investigators were Mike Partridge and subsequently Jeffrey Albert. The contract was...two your effort to develop techniques for Built-In Test (BIT) verification. The objective of the contract was to develop specifications and technical
Verification testing of the Waterloo Biofilter Systems (WBS), Inc. Waterloo Biofilter® Model 4-Bedroom system was conducted over a thirteen month period at the Massachusetts Alternative Septic System Test Center (MASSTC) located at Otis Air National Guard Base in Bourne, Mas...
Verification testing of the SUNTEC LPX200 UV Disinfection System to develop the UV delivered dose flow relationship was conducted at the Parsippany-Troy Hills wastewater treatment plant test site in Parsippany, New Jersey. Two lamp modules were mounted parallel in a 6.5-meter lon...
Verification testing of the SeptiTech Model 400 System was conducted over a twelve month period at the Massachusetts Alternative Septic System Test Center (MASSTC) located at the Otis Air National Guard Base in Borne, MA. Sanitary Sewerage from the base residential housing was u...
Verification testing of the Bio-Microbics RetroFAST® 0.375 System to determine the reduction of nitrogen in residential wastewater was conducted over a twelve-month period at the Mamquam Wastewater Technology Test Facility, located at the Mamquam Wastewater Treatment Plant. The R...
Verification testing of the Aquapoint, Inc. (AQP) BioclereTM Model 16/12 was conducted over a thirteen month period at the Massachusetts Alternative Septic System Test Center (MASSTC), located at Otis Air National Guard Base in Bourne, Massachusetts. Sanitary sewerage from the ba...
14 CFR 460.17 - Verification program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... software in an operational flight environment before allowing any space flight participant on board during a flight. Verification must include flight testing. ... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.17 Verification...
14 CFR 460.17 - Verification program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... software in an operational flight environment before allowing any space flight participant on board during a flight. Verification must include flight testing. ... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.17 Verification...
14 CFR 460.17 - Verification program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... software in an operational flight environment before allowing any space flight participant on board during a flight. Verification must include flight testing. ... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.17 Verification...
14 CFR 460.17 - Verification program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... software in an operational flight environment before allowing any space flight participant on board during a flight. Verification must include flight testing. ... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.17 Verification...
14 CFR 460.17 - Verification program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... software in an operational flight environment before allowing any space flight participant on board during a flight. Verification must include flight testing. ... TRANSPORTATION LICENSING HUMAN SPACE FLIGHT REQUIREMENTS Launch and Reentry with Crew § 460.17 Verification...
Adjusting for partial verification or workup bias in meta-analyses of diagnostic accuracy studies.
de Groot, Joris A H; Dendukuri, Nandini; Janssen, Kristel J M; Reitsma, Johannes B; Brophy, James; Joseph, Lawrence; Bossuyt, Patrick M M; Moons, Karel G M
2012-04-15
A key requirement in the design of diagnostic accuracy studies is that all study participants receive both the test under evaluation and the reference standard test. For a variety of practical and ethical reasons, sometimes only a proportion of patients receive the reference standard, which can bias the accuracy estimates. Numerous methods have been described for correcting this partial verification bias or workup bias in individual studies. In this article, the authors describe a Bayesian method for obtaining adjusted results from a diagnostic meta-analysis when partial verification or workup bias is present in a subset of the primary studies. The method corrects for verification bias without having to exclude primary studies with verification bias, thus preserving the main advantages of a meta-analysis: increased precision and better generalizability. The results of this method are compared with the existing methods for dealing with verification bias in diagnostic meta-analyses. For illustration, the authors use empirical data from a systematic review of studies of the accuracy of the immunohistochemistry test for diagnosis of human epidermal growth factor receptor 2 status in breast cancer patients.
Test/QA Plan for Verification of Ozone Indicator Cards
This verification test will address ozone indicator cards (OICs) that provide short-term semi-quantitative measures of ozone concentration in ambient air. Testing will be conducted under the auspices of the U.S. Environmental Protection Agency (EPA) through the Environmental Tec...
Top DoD Management Challenges, Fiscal Year 2018
2018-01-01
Afghan Human Resource Information Management System to validate ANDSF personnel numbers and salaries; • Afghan Personnel Pay System to facilitate...unit strength accountability and personnel verification; and • Core Information Management System to improve accountability of equipment inventories...ACQUISITION AND CONTRACT MANAGEMENT Federal Acquisition Regulation requires contractor performance information be collected in the Contractor
76 FR 64859 - Pilot Loading of Navigation and Terrain Awareness Database Updates
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... category the task of updating databases used in self-contained, front-panel or pedestal-mounted navigation... Rule This rulemaking would allow pilots of all certificated aircraft equipped with self-contained... verification, or by errors in ATC assignments which may occur during redirection of the flight. Both types of...
Michael C. Wiemann; Edgard O. Espinoza
2017-01-01
To evade endangered timber species laws, unscrupulous importers sometimes attempt to pass protected Dalbergia nigra as look-alike but unprotected, Dalbergia Spruceana. Wood density and fluorescence properties are sometimes used to identify the species. Although these properties are useful and do not require special equipment,...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
...'' (Russian Federation); R75, ``Heat meters'' (Germany); R80, ``Road and rail tankers with level gauging...)'' (Russian Federation); R92, ``Wood moisture meters--Verification methods and equipment: general provisions... liquids other than water'' (Switzerland); R124, ``Refractometers for the measurement of the sugar content...
Space shuttle engineering and operations support. Avionics system engineering
NASA Technical Reports Server (NTRS)
Broome, P. A.; Neubaur, R. J.; Welsh, R. T.
1976-01-01
The shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.
Verification Testing of Air Pollution Control Technology Quality Management Plan Revision 2.3
The Air Pollution Control Technology Verification Center was established in 1995 as part of the EPA’s Environmental Technology Verification Program to accelerate the development and commercialization of improved environmental technologies’ performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeVolpi, A.; Palm, R.
CFE poses a number of verification challenges that could be met in part by an accurate and low-cost means of aiding in accountability of treaty-limited equipment. Although the treaty as signed does not explicitly call for the use of tags, there is a provision for recording serial numbers'' and placing special marks'' on equipment subject to reduction. There are approximately 150,000 residual items to be tracked for CFE-I, about half for each alliance of state parties. These highly mobile items are subject to complex treaty limitations: deployment limits and zones, ceilings subceilings, holdings and allowances. There are controls and requirementsmore » for storage, conversion, and reduction. In addition, there are national security concerns regarding modernization and mobilization capability. As written into the treaty, a heavy reliance has been placed on human inspectors for CFE verification. Inspectors will mostly make visual observations and photographs as the means of monitoring compliance; these observations can be recorded by handwriting or keyed into a laptop computer. CFE is now less a treaty between two alliances than a treaty among 22 state parties, with inspection data an reports to be shared with each party in the official languages designated by CSCE. One of the potential roles for bar-coded tags would be to provide a universal, exchangable, computer-compatible language for tracking TLE. 10 figs.« less
Verification testing of the F.R. Mahoney Amphidrome System was conducted over a twelve month period at the Massachusetts Alternative Septic System Test Center (MASSTC) located at the Otis Air National Guard Base in Borne, MA. Sanitary Sewerage from the base residential housing w...
Zhang, Ying; Alonzo, Todd A
2016-11-01
In diagnostic medicine, the volume under the receiver operating characteristic (ROC) surface (VUS) is a commonly used index to quantify the ability of a continuous diagnostic test to discriminate between three disease states. In practice, verification of the true disease status may be performed only for a subset of subjects under study since the verification procedure is invasive, risky, or expensive. The selection for disease examination might depend on the results of the diagnostic test and other clinical characteristics of the patients, which in turn can cause bias in estimates of the VUS. This bias is referred to as verification bias. Existing verification bias correction in three-way ROC analysis focuses on ordinal tests. We propose verification bias-correction methods to construct ROC surface and estimate the VUS for a continuous diagnostic test, based on inverse probability weighting. By applying U-statistics theory, we develop asymptotic properties for the estimator. A Jackknife estimator of variance is also derived. Extensive simulation studies are performed to evaluate the performance of the new estimators in terms of bias correction and variance. The proposed methods are used to assess the ability of a biomarker to accurately identify stages of Alzheimer's disease. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Spacecraft-level verification of the Van Allen Probes' RF communication system
NASA Astrophysics Data System (ADS)
Crowne, M. J.; Srinivasan, D.; Royster, D.; Weaver, G.; Matlin, D.; Mosavi, N.
This paper presents the verification process, lessons learned, and selected test results of the radio frequency (RF) communication system of the Van Allen Probes, formerly known as the Radiation Belt Storm Probes (RBSP). The Van Allen Probes mission is investigating the doughnut-shaped regions of space known as the Van Allen radiation belts where the Sun interacts with charged particles trapped in Earth's magnetic field. Understanding this dynamic area that surrounds our planet is important to improving our ability to design spacecraft and missions for reliability and astronaut safety. The Van Allen Probes mission features two nearly identical spacecraft designed, built, and operated by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) for the National Aeronautics and Space Administration (NASA). The RF communication system features the JHU/APL Frontier Radio. The Frontier Radio is a software-defined radio (SDR) designed for spaceborne communications, navigation, radio science, and sensor applications. This mission marks the first spaceflight usage of the Frontier Radio. RF ground support equipment (RF GSE) was developed using a ground station receiver similar to what will be used in flight and whose capabilities provided clarity into RF system performance that was previously not obtained until compatibility testing with the ground segments. The Van Allen Probes underwent EMC, acoustic, vibration, and thermal vacuum testing at the environmental test facilities at APL. During this time the RF communication system was rigorously tested to ensure optimal performance, including system-level testing down to threshold power levels. Compatibility tests were performed with the JHU/APL Satellite Communication Facility (SCF), the Universal Space Network (USN), and the Tracking and Data Relay Satellite System (TDRSS). Successful completion of this program as described in this paper validated the design of the system and demonstrated that it will be able to me- t all of the Van Allen Probes's communications requirements with its intended ground segments.
Aircraft electromagnetic compatibility
NASA Technical Reports Server (NTRS)
Clarke, Clifton A.; Larsen, William E.
1987-01-01
Illustrated are aircraft architecture, electromagnetic interference environments, electromagnetic compatibility protection techniques, program specifications, tasks, and verification and validation procedures. The environment of 400 Hz power, electrical transients, and radio frequency fields are portrayed and related to thresholds of avionics electronics. Five layers of protection for avionics are defined. Recognition is given to some present day electromagnetic compatibility weaknesses and issues which serve to reemphasize the importance of EMC verification of equipment and parts, and their ultimate EMC validation on the aircraft. Proven standards of grounding, bonding, shielding, wiring, and packaging are laid out to help provide a foundation for a comprehensive approach to successful future aircraft design and an understanding of cost effective EMC in an aircraft setting.
Verification bias an underrecognized source of error in assessing the efficacy of medical imaging.
Petscavage, Jonelle M; Richardson, Michael L; Carr, Robert B
2011-03-01
Diagnostic tests are validated by comparison against a "gold standard" reference test. When the reference test is invasive or expensive, it may not be applied to all patients. This can result in biased estimates of the sensitivity and specificity of the diagnostic test. This type of bias is called "verification bias," and is a common problem in imaging research. The purpose of our study is to estimate the prevalence of verification bias in the recent radiology literature. All issues of the American Journal of Roentgenology (AJR), Academic Radiology, Radiology, and European Journal of Radiology (EJR) between November 2006 and October 2009 were reviewed for original research articles mentioning sensitivity or specificity as endpoints. Articles were read to determine whether verification bias was present and searched for author recognition of verification bias in the design. During 3 years, these journals published 2969 original research articles. A total of 776 articles used sensitivity or specificity as an outcome. Of these, 211 articles demonstrated potential verification bias. The fraction of articles with potential bias was respectively 36.4%, 23.4%, 29.5%, and 13.4% for AJR, Academic Radiology, Radiology, and EJR. The total fraction of papers with potential bias in which the authors acknowledged this bias was 17.1%. Verification bias is a common and frequently unacknowledged source of error in efficacy studies of diagnostic imaging. Bias can often be eliminated by proper study design. When it cannot be eliminated, it should be estimated and acknowledged. Published by Elsevier Inc.
Time dependent pre-treatment EPID dosimetry for standard and FFF VMAT.
Podesta, Mark; Nijsten, Sebastiaan M J J G; Persoon, Lucas C G G; Scheib, Stefan G; Baltes, Christof; Verhaegen, Frank
2014-08-21
Methods to calibrate Megavoltage electronic portal imaging devices (EPIDs) for dosimetry have been previously documented for dynamic treatments such as intensity modulated radiotherapy (IMRT) using flattened beams and typically using integrated fields. While these methods verify the accumulated field shape and dose, the dose rate and differential fields remain unverified. The aim of this work is to provide an accurate calibration model for time dependent pre-treatment dose verification using amorphous silicon (a-Si) EPIDs in volumetric modulated arc therapy (VMAT) for both flattened and flattening filter free (FFF) beams. A general calibration model was created using a Varian TrueBeam accelerator, equipped with an aS1000 EPID, for each photon spectrum 6 MV, 10 MV, 6 MV-FFF, 10 MV-FFF. As planned VMAT treatments use control points (CPs) for optimization, measured images are separated into corresponding time intervals for direct comparison with predictions. The accuracy of the calibration model was determined for a range of treatment conditions. Measured and predicted CP dose images were compared using a time dependent gamma evaluation using criteria (3%, 3 mm, 0.5 sec). Time dependent pre-treatment dose verification is possible without an additional measurement device or phantom, using the on-board EPID. Sufficient data is present in trajectory log files and EPID frame headers to reliably synchronize and resample portal images. For the VMAT plans tested, significantly more deviation is observed when analysed in a time dependent manner for FFF and non-FFF plans than when analysed using only the integrated field. We show EPID-based pre-treatment dose verification can be performed on a CP basis for VMAT plans. This model can measure pre-treatment doses for both flattened and unflattened beams in a time dependent manner which highlights deviations that are missed in integrated field verifications.
NASA Technical Reports Server (NTRS)
1979-01-01
Structural analysis and certification of the collector system is presented. System verification against the interim performance criteria is presented and indicated by matrices. The verification discussion, analysis, and test results are also given.
NASA Astrophysics Data System (ADS)
Zamani, K.; Bombardelli, F. A.
2014-12-01
Verification of geophysics codes is imperative to avoid serious academic as well as practical consequences. In case that access to any given source code is not possible, the Method of Manufactured Solution (MMS) cannot be employed in code verification. In contrast, employing the Method of Exact Solution (MES) has several practical advantages. In this research, we first provide four new one-dimensional analytical solutions designed for code verification; these solutions are able to uncover the particular imperfections of the Advection-diffusion-reaction equation, such as nonlinear advection, diffusion or source terms, as well as non-constant coefficient equations. After that, we provide a solution of Burgers' equation in a novel setup. Proposed solutions satisfy the continuity of mass for the ambient flow, which is a crucial factor for coupled hydrodynamics-transport solvers. Then, we use the derived analytical solutions for code verification. To clarify gray-literature issues in the verification of transport codes, we designed a comprehensive test suite to uncover any imperfection in transport solvers via a hierarchical increase in the level of tests' complexity. The test suite includes hundreds of unit tests and system tests to check vis-a-vis the portions of the code. Examples for checking the suite start by testing a simple case of unidirectional advection; then, bidirectional advection and tidal flow and build up to nonlinear cases. We design tests to check nonlinearity in velocity, dispersivity and reactions. The concealing effect of scales (Peclet and Damkohler numbers) on the mesh-convergence study and appropriate remedies are also discussed. For the cases in which the appropriate benchmarks for mesh convergence study are not available, we utilize symmetry. Auxiliary subroutines for automation of the test suite and report generation are designed. All in all, the test package is not only a robust tool for code verification but it also provides comprehensive insight on the ADR solvers capabilities. Such information is essential for any rigorous computational modeling of ADR equation for surface/subsurface pollution transport. We also convey our experiences in finding several errors which were not detectable with routine verification techniques.
Test/QA Plan For Verification Of Anaerobic Digester For Energy Production And Pollution Prevention
The ETV-ESTE Program conducts third-party verification testing of commercially available technologies that improve the environmental conditions in the U.S. A stakeholder committee of buyers and users of such technologies guided the development of this test on anaerobic digesters...
Considerations in STS payload environmental verification
NASA Technical Reports Server (NTRS)
Keegan, W. B.
1978-01-01
The current philosophy of the GSFS regarding environmental verification of Shuttle payloads is reviewed. In the structures area, increased emphasis will be placed on the use of analysis for design verification, with selective testing performed as necessary. Furthermore, as a result of recent cost optimization analysis, the multitier test program will presumably give way to a comprehensive test program at the major payload subassembly level after adequate workmanship at the component level has been verified. In the thermal vacuum area, thought is being given to modifying the approaches used for conventional spacecraft.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-03-01
The certification and verification of the Northrup Model NSC-01-0732 Fresnel lens tracking solar collector are presented. A certification statement is included with signatures and a separate report on the structural analysis of the collector system. System verification against the Interim Performance Criteria are indicated by matrices with verification discussion, analysis, and enclosed test results.
Performance verification of the FlashCam prototype camera for the Cherenkov Telescope Array
NASA Astrophysics Data System (ADS)
Werner, F.; Bauer, C.; Bernhard, S.; Capasso, M.; Diebold, S.; Eisenkolb, F.; Eschbach, S.; Florin, D.; Föhr, C.; Funk, S.; Gadola, A.; Garrecht, F.; Hermann, G.; Jung, I.; Kalekin, O.; Kalkuhl, C.; Kasperek, J.; Kihm, T.; Lahmann, R.; Marszalek, A.; Pfeifer, M.; Principe, G.; Pühlhofer, G.; Pürckhauer, S.; Rajda, P. J.; Reimer, O.; Santangelo, A.; Schanz, T.; Schwab, T.; Steiner, S.; Straumann, U.; Tenzer, C.; Vollhardt, A.; Wolf, D.; Zietara, K.; CTA Consortium
2017-12-01
The Cherenkov Telescope Array (CTA) is a future gamma-ray observatory that is planned to significantly improve upon the sensitivity and precision of the current generation of Cherenkov telescopes. The observatory will consist of several dozens of telescopes with different sizes and equipped with different types of cameras. Of these, the FlashCam camera system is the first to implement a fully digital signal processing chain which allows for a traceable, configurable trigger scheme and flexible signal reconstruction. As of autumn 2016, a prototype FlashCam camera for the medium-sized telescopes of CTA nears completion. First results of the ongoing system tests demonstrate that the signal chain and the readout system surpass CTA requirements. The stability of the system is shown using long-term temperature cycling.
NASA Technical Reports Server (NTRS)
Larsen, Curtis E.
2012-01-01
As commercial companies are nearing a preliminary design review level of design maturity, several companies are identifying the process for qualifying their multi-use electrical and mechanical components for various shock environments, including pyrotechnic, mortar firing, and water impact. The experience in quantifying the environments consists primarily of recommendations from Military Standard-1540, Product Verification Requirement for Launch, Upper Stage, and Space Vehicles. Therefore, the NASA Engineering and Safety Center (NESC) formed a team of NASA shock experts to share the NASA experience with qualifying hardware for the Space Shuttle Program (SSP) and other applicable programs and projects. Several team teleconferences were held to discuss past experience and to share ideas of possible methods for qualifying components for multiple missions. This document contains the information compiled from the discussions
Electrophoretic purification of cells in space - Evaluation of results from STS-3
NASA Technical Reports Server (NTRS)
Sarnoff, B. E.; Kunze, M. E.; Todd, P.
1983-01-01
The procedure and results of Electrophoresis Equipment Verification Test, designed to examine electrophoretic behavior of animal cells is suspension more concentrated than possible on earth and flown on the Shuttle flight STS-3, were discussed. Ground-based laboratory values of electrophoretic mobilities of a mixture of human and rabbit aldehyde-fixed red blood cells (RBC) were compared with those recorded at 11 minute intervals on the Shuttle STS-3. RBC migration and separation observed through photographic records were not as expected. However, cell mobilities and migrating band profiles were consistent with the results of laboratory simulation experiments. It was concluded that zero G electrophoresis of very high concentrations (1 x 10 to the 9th) is possible and similar to electrophoresis of normal cell concentrations on earth.
40 CFR 1066.215 - Summary of verification and calibration procedures for chassis dynamometers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer... manufacturer instructions and good engineering judgment. (c) Automated dynamometer verifications and... accomplish the verifications and calibrations specified in this subpart. You may use these automated...
40 CFR 1066.215 - Summary of verification and calibration procedures for chassis dynamometers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer... manufacturer instructions and good engineering judgment. (c) Automated dynamometer verifications and... accomplish the verifications and calibrations specified in this subpart. You may use these automated...
Options and Risk for Qualification of Electric Propulsion System
NASA Technical Reports Server (NTRS)
Bailey, Michelle; Daniel, Charles; Cook, Steve (Technical Monitor)
2002-01-01
Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.
This report reviews the filtration and pressure drop performance of GE Energy's QG061 filtration media. Environmental Technology Verification (ETV) testing of this technology/product was conducted during a series of tests in September 2008. The objective of the ETV Program is to ...
Verification of Ceramic Structures
NASA Astrophysics Data System (ADS)
Behar-Lafenetre, Stephanie; Cornillon, Laurence; Rancurel, Michael; De Graaf, Dennis; Hartmann, Peter; Coe, Graham; Laine, Benoit
2012-07-01
In the framework of the “Mechanical Design and Verification Methodologies for Ceramic Structures” contract [1] awarded by ESA, Thales Alenia Space has investigated literature and practices in affiliated industries to propose a methodological guideline for verification of ceramic spacecraft and instrument structures. It has been written in order to be applicable to most types of ceramic or glass-ceramic materials - typically Cesic®, HBCesic®, Silicon Nitride, Silicon Carbide and ZERODUR®. The proposed guideline describes the activities to be performed at material level in order to cover all the specific aspects of ceramics (Weibull distribution, brittle behaviour, sub-critical crack growth). Elementary tests and their post-processing methods are described, and recommendations for optimization of the test plan are given in order to have a consistent database. The application of this method is shown on an example in a dedicated article [7]. Then the verification activities to be performed at system level are described. This includes classical verification activities based on relevant standard (ECSS Verification [4]), plus specific analytical, testing and inspection features. The analysis methodology takes into account the specific behaviour of ceramic materials, especially the statistical distribution of failures (Weibull) and the method to transfer it from elementary data to a full-scale structure. The demonstration of the efficiency of this method is described in a dedicated article [8]. The verification is completed by classical full-scale testing activities. Indications about proof testing, case of use and implementation are given and specific inspection and protection measures are described. These additional activities are necessary to ensure the required reliability. The aim of the guideline is to describe how to reach the same reliability level as for structures made of more classical materials (metals, composites).
Code of Federal Regulations, 2010 CFR
2010-10-01
... that the ERMM meets the performance criteria contained in this appendix and that test verification data are available to a railroad or to FRA upon request. 2. The test verification data shall contain, at a minimum, all pertinent original data logs and documentation that the test sample preparation, test set up...
Code of Federal Regulations, 2011 CFR
2011-10-01
... that the ERMM meets the performance criteria contained in this appendix and that test verification data are available to a railroad or to FRA upon request. 2. The test verification data shall contain, at a minimum, all pertinent original data logs and documentation that the test sample preparation, test set up...
Code of Federal Regulations, 2014 CFR
2014-10-01
... that the ERMM meets the performance criteria contained in this appendix and that test verification data are available to a railroad or to FRA upon request. 2. The test verification data shall contain, at a minimum, all pertinent original data logs and documentation that the test sample preparation, test set up...
Code of Federal Regulations, 2012 CFR
2012-10-01
... that the ERMM meets the performance criteria contained in this appendix and that test verification data are available to a railroad or to FRA upon request. 2. The test verification data shall contain, at a minimum, all pertinent original data logs and documentation that the test sample preparation, test set up...
Code of Federal Regulations, 2013 CFR
2013-10-01
... that the ERMM meets the performance criteria contained in this appendix and that test verification data are available to a railroad or to FRA upon request. 2. The test verification data shall contain, at a minimum, all pertinent original data logs and documentation that the test sample preparation, test set up...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 11011 Indian IC For the “organized” sector, except for computers and related equipment: Directorate... 110011 Indian IC For computers and related electronic items: Department of Electronics, Lok Nayak Bhawan... and Exports 5, Civic Center Islamabad IC Joint Science Advisor, Ministry of Science and Technology...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 11011 Indian IC For the “organized” sector, except for computers and related equipment: Directorate... 110011 Indian IC For computers and related electronic items: Department of Electronics, Lok Nayak Bhawan... and Exports 5, Civic Center Islamabad IC Joint Science Advisor, Ministry of Science and Technology...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 11011 Indian IC For the “organized” sector, except for computers and related equipment: Directorate... 110011 Indian IC For computers and related electronic items: Department of Electronics, Lok Nayak Bhawan... and Exports 5, Civic Center Islamabad IC Joint Science Advisor, Ministry of Science and Technology...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 11011 Indian IC For the “organized” sector, except for computers and related equipment: Directorate... 110011 Indian IC For computers and related electronic items: Department of Electronics, Lok Nayak Bhawan... Controller of Imports and Exports 5, Civic Center Islamabad IC Joint Science Advisor, Ministry of Science and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 11011 Indian IC For the “organized” sector, except for computers and related equipment: Directorate... 110011 Indian IC For computers and related electronic items: Department of Electronics, Lok Nayak Bhawan... Controller of Imports and Exports 5, Civic Center Islamabad IC Joint Science Advisor, Ministry of Science and...
76 FR 76762 - Notice of Lodging of Consent Decree Under the Clean Air Act
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-08
... refrigerant from appliances it accepts for disposal. The Consent Decree provides for a civil penalty of $3,500... Facility: (1) Purchase equipment to recover refrigerant or contract for such services and provide for such... verification (e.g., that all refrigerant that had not leaked previously was properly evacuated); (3) require...
The purpose of this SOP is to assure suitable temperature maintenance in refrigerators and freezers used for sample storage during the Arizona NHEXAS project and the "Border" study. Keywords: lab; equipment; refrigerators and freezers.
The National Human Exposure Assessment Su...
Shuttle payload interface verification equipment study. Volume 3: Specification data
NASA Technical Reports Server (NTRS)
1976-01-01
A complete description is given of the IVE physical and performance design requirements as evolved in this study. The data are presented in a format to facilitate the development of an item specification. Data were used to support the development of the project plan data (schedules, cost, etc.) contained in Volume 4 of this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ravi, Kavita; Bennich, Peter; Cockburn, John
2013-10-15
The Global Efficiency Medal competition, a cornerstone activity of the Super-efficient Equipment and Appliance Deployment (SEAD) Initiative, is an awards program that encourages the production and sale of super-efficient products. SEAD is a voluntary multinational government collaboration of the Clean Energy Ministerial (CEM). This winner-takes-all competition recognizes products with the best energy efficiency, guides early adopter purchasers towards the most efficient product choices and demonstrates the levels of energy efficiency achievable by commercially available and emerging technologies. The first Global Efficiency Medals were awarded to the most energy-efficient flat panel televisions; an iconic consumer purchase. SEAD Global Efficiency Medals weremore » awarded to televisions that have proven to be substantially more energy efficient than comparable models available at the time of the competition (applications closed in the end of May 2012). The award-winning TVs consume between 33 to 44 percent less energy per 2 unit of screen area than comparable LED-backlit LCD televisions sold in each regional market and 50 to 60 percent less energy than CCFL-backlit LCD TVs. Prior to the launch of this competition, SEAD conducted an unprecedented international round-robin test (RRT) to qualify TV test laboratories to support verification testing for SEAD awards. The RRT resulted in increased test laboratory capacity and expertise around the world and ensured that the test results from participating regional test laboratories could be compared in a fair and transparent fashion. This paper highlights a range of benefits resulting from this first SEAD awards competition and encourages further investigation of the awards concept as a means to promote energy efficiency in other equipment types.« less
Assessment of Galileo modal test results for mathematical model verification
NASA Technical Reports Server (NTRS)
Trubert, M.
1984-01-01
The modal test program for the Galileo Spacecraft was completed at the Jet Propulsion Laboratory in the summer of 1983. The multiple sine dwell method was used for the baseline test. The Galileo Spacecraft is a rather complex 2433 kg structure made of a central core on which seven major appendages representing 30 percent of the total mass are attached, resulting in a high modal density structure. The test revealed a strong nonlinearity in several major modes. This nonlinearity discovered in the course of the test necessitated running additional tests at the unusually high response levels of up to about 21 g. The high levels of response were required to obtain a model verification valid at the level of loads for which the spacecraft was designed. Because of the high modal density and the nonlinearity, correlation between the dynamic mathematical model and the test results becomes a difficult task. Significant changes in the pre-test analytical model are necessary to establish confidence in the upgraded analytical model used for the final load verification. This verification, using a test verified model, is required by NASA to fly the Galileo Spacecraft on the Shuttle/Centaur launch vehicle in 1986.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the Shuttle Landing Facility, workers in cherry pickers (left and right) help direct the offloading of the Italian Space Agency's Multi- Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
MPLM Donatello is offloaded at the SLF
NASA Technical Reports Server (NTRS)
2001-01-01
At the Shuttle Landing Facility, cranes are poised to help offload the Italian Space Agency's Multi- Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.
VERIFYING THE VOC CONTROL PERFORMANCE OF BIOREACTORS
The paper describes the verification testing approach used to collect high-quality, peer-reviewed data on the performance of bioreaction-based technologies for the control of volatile organic compounds (VOCs). The verification protocol that describes the approach for these tests ...
BAGHOUSE FILTRATION PRODUCTS VERIFICATION TESTING, HOW IT BENEFITS THE BOILER BAGHOUSE OPERATOR
The paper describes the Environmental Technology Verification (ETV) Program for baghouse filtration products developed by the Air Pollution Control Technology Verification Center, one of six Centers under the ETV Program, and discusses how it benefits boiler baghouse operators. A...
Under EPA's Environmental Technology Verification Program, Research Triangle Institute (RTI) will operate the Air Pollution Control Technology Center to verify the filtration efficiency and bioaerosol inactivation efficiency of heating, ventilation and air conditioning air cleane...
Certification and verification for Calmac flat plate solar collector
NASA Technical Reports Server (NTRS)
1978-01-01
Information used in the certification and verification of the Calmac Flat Plate Collector is presented. Contained are such items as test procedures and results, information on materials used, installation, operation, and maintenance manuals, and other information pertaining to the verification and certification.
The Greenhouse Gas (GHG) Technology Verification Center is one of 12 independently operated verification centers established by the U.S. Environmental Protection Agency. The Center provides third-party performance data to stakeholders interested in environmetnal technologies tha...
40 CFR 1066.275 - Daily dynamometer readiness verification.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.275 Daily... automated process for this verification procedure, perform this evaluation by setting the initial speed and... your dynamometer does not perform this verification with an automated process: (1) With the dynamometer...
Infrared Heater Used in Qualification Testing of International Space Station Radiators
NASA Technical Reports Server (NTRS)
Ziemke, Robert A.
2004-01-01
Two heat rejection radiator systems for the International Space Station (ISS) have undergone thermal vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the Space Power Facility (SPF), the largest thermal vacuum chamber in the world. The heat rejection system radiator was tested first; it removes heat from the ISS crew living quarters. The second system tested was the photovoltaic radiator (PVR), which rejects heat from the ISS photovoltaic arrays and the electrical power-conditioning equipment. The testing included thermal cycling, hot- and cold-soaked deployments, thermal gradient deployments, verification of the onboard heater controls, and for the PVR, thermal performance tests with ammonia flow. Both radiator systems are orbital replacement units for ease of replacement on the ISS. One key to the success of these tests was the performance of the infrared heater system. It was used in conjunction with a gaseous-nitrogen-cooled cryoshroud in the SPF vacuum chamber to achieve the required thermal vacuum conditions for the qualification tests. The heater, which was designed specifically for these tests, was highly successful and easily met the test requirements. This report discusses the heating requirements, the heater design features, the design approach, and the mathematical basis of the design.
Systematic Model-in-the-Loop Test of Embedded Control Systems
NASA Astrophysics Data System (ADS)
Krupp, Alexander; Müller, Wolfgang
Current model-based development processes offer new opportunities for verification automation, e.g., in automotive development. The duty of functional verification is the detection of design flaws. Current functional verification approaches exhibit a major gap between requirement definition and formal property definition, especially when analog signals are involved. Besides lack of methodical support for natural language formalization, there does not exist a standardized and accepted means for formal property definition as a target for verification planning. This article addresses several shortcomings of embedded system verification. An Enhanced Classification Tree Method is developed based on the established Classification Tree Method for Embeded Systems CTM/ES which applies a hardware verification language to define a verification environment.
NASA Technical Reports Server (NTRS)
1989-01-01
The design and verification requirements are defined which are appropriate to hardware at the detail, subassembly, component, and engine levels and to correlate these requirements to the development demonstrations which provides verification that design objectives are achieved. The high pressure fuel turbopump requirements verification matrix provides correlation between design requirements and the tests required to verify that the requirement have been met.
Control and Non-Payload Communications (CNPC) Prototype Radio Verification Test Report
NASA Technical Reports Server (NTRS)
Bishop, William D.; Frantz, Brian D.; Thadhani, Suresh K.; Young, Daniel P.
2017-01-01
This report provides an overview and results from the verification of the specifications that defines the operational capabilities of the airborne and ground, L Band and C Band, Command and Non-Payload Communications radio link system. An overview of system verification is provided along with an overview of the operation of the radio. Measurement results are presented for verification of the radios operation.
This Environmental Technology Verification Program test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR P...
2003-03-01
Different?," Jour. of Experimental & Theoretical Artificial Intelligence, Special Issue on Al for Systems Validation and Verification, 12(4), 2000, pp...Hamilton, D., " Experiences in Improving the State of Practice in Verification and Validation of Knowledge-Based Systems," Workshop Notes of the AAAI...Unsuspected Power of the Standard Turing Test," Jour. of Experimental & Theoretical Artificial Intelligence., 12, 2000, pp3 3 1-3 4 0 . [30] Gaschnig
Securely Partitioning Spacecraft Computing Resources: Validation of a Separation Kernel
NASA Astrophysics Data System (ADS)
Bremer, Leon; Schreutelkamp, Erwin
2011-08-01
The F-35 Lightning II, also known as the Joint Strike Fighter, will be the first operational fighter aircraft equipped with an operational MultiShip Embedded Training capability. This onboard training system allows teams of fighter pilots to jointly operate their F-35 in flight against virtual threats, avoiding the need for real adversary air threats and surface threat systems in their training. The European Real-time Operations Simulator (EuroSim) framework is well known in the space domain, particularly in support of engineering and test phases of space system development. In the MultiShip Embedded Training project, EuroSim is not only the essential tool for development and verification throughout the project but is also the engine of the final embedded simulator on board of the F-35 aircraft. The novel ways in which EuroSim is applied in the project in relation to distributed simulation problems, team collaboration, tool chains and embedded systems can benefit many projects and applications. The paper describes the application of EuroSim as the simulation engine of the F-35 Embedded Training solution, the extensions to the EuroSim product that enable this application, and its usage in development and verification of the whole project as carried out at the sites of Dutch Space and the National Aerospace Laboratory (NLR).
Investigations on the magnetization behavior of magnetic composite particles
NASA Astrophysics Data System (ADS)
Eichholz, Christian; Knoll, Johannes; Lerche, Dietmar; Nirschl, Hermann
2014-11-01
In life sciences the application of surface functionalized magnetic composite particles is establishing in diagnostics and in downstream processing of modern biotechnology. These magnetic composite particles consist of non-magnetic material, e.g. polystyrene, which serves as a matrix for the second magnetic component, usually colloidal magnetite. Because of the multitude of magnetic cores these magnetic beads show a complex magnetization behavior which cannot be described with the available approaches for homogeneous magnetic material. Therefore, in this work a new model for the magnetization behavior of magnetic composite particles is developed. By introducing an effective magnetization and considering an overall demagnetization factor the deviation of the demagnetization of homogeneously magnetized particles is taken into account. Calculated and experimental results show a good agreement which allows for the verification of the adapted model of particle magnetization. Besides, a newly developed magnetic analyzing centrifuge is used for the characterization of magnetic composite particle systems. The experimental results, also used for the model verification, give both, information about the magnetic properties and the interaction behavior of particle systems. By adding further components to the particle solution, such as salts or proteins, industrial relevant systems can be reconstructed. The analyzing tool can be used to adapt industrial processes without time-consuming preliminary tests with large samples in the process equipments.
Exomars Mission Verification Approach
NASA Astrophysics Data System (ADS)
Cassi, Carlo; Gilardi, Franco; Bethge, Boris
According to the long-term cooperation plan established by ESA and NASA in June 2009, the ExoMars project now consists of two missions: A first mission will be launched in 2016 under ESA lead, with the objectives to demonstrate the European capability to safely land a surface package on Mars, to perform Mars Atmosphere investigation, and to provide communi-cation capability for present and future ESA/NASA missions. For this mission ESA provides a spacecraft-composite, made up of an "Entry Descent & Landing Demonstrator Module (EDM)" and a Mars Orbiter Module (OM), NASA provides the Launch Vehicle and the scientific in-struments located on the Orbiter for Mars atmosphere characterisation. A second mission with it launch foreseen in 2018 is lead by NASA, who provides spacecraft and launcher, the EDL system, and a rover. ESA contributes the ExoMars Rover Module (RM) to provide surface mobility. It includes a drill system allowing drilling down to 2 meter, collecting samples and to investigate them for signs of past and present life with exobiological experiments, and to investigate the Mars water/geochemical environment, In this scenario Thales Alenia Space Italia as ESA Prime industrial contractor is in charge of the design, manufacturing, integration and verification of the ESA ExoMars modules, i.e.: the Spacecraft Composite (OM + EDM) for the 2016 mission, the RM for the 2018 mission and the Rover Operations Control Centre, which will be located at Altec-Turin (Italy). The verification process of the above products is quite complex and will include some pecu-liarities with limited or no heritage in Europe. Furthermore the verification approach has to be optimised to allow full verification despite significant schedule and budget constraints. The paper presents the verification philosophy tailored for the ExoMars mission in line with the above considerations, starting from the model philosophy, showing the verification activities flow and the sharing of tests between the different levels (system, modules, subsystems, etc) and giving an overview of the main test defined at Spacecraft level. The paper is mainly focused on the verification aspects of the EDL Demonstrator Module and the Rover Module, for which an intense testing activity without previous heritage in Europe is foreseen. In particular the Descent Module has to survive to the Mars atmospheric entry and landing, its surface platform has to stay operational for 8 sols on Martian surface, transmitting scientific data to the Orbiter. The Rover Module has to perform 180 sols mission in Mars surface environment. These operative conditions cannot be verified only by analysis; consequently a test campaign is defined including mechanical tests to simulate the entry loads, thermal test in Mars environment and the simulation of Rover operations on a 'Mars like' terrain. Finally, the paper present an overview of the documentation flow defined to ensure the correct translation of the mission requirements in verification activities (test, analysis, review of design) until the final verification close-out of the above requirements with the final verification reports.
The U.S. EPA has created the Environmental Technology Verification program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. The program tested the performance of baghouse filtrati...
Validation of mesoscale models
NASA Technical Reports Server (NTRS)
Kuo, Bill; Warner, Tom; Benjamin, Stan; Koch, Steve; Staniforth, Andrew
1993-01-01
The topics discussed include the following: verification of cloud prediction from the PSU/NCAR mesoscale model; results form MAPS/NGM verification comparisons and MAPS observation sensitivity tests to ACARS and profiler data; systematic errors and mesoscale verification for a mesoscale model; and the COMPARE Project and the CME.
ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT--BAGHOUSE FILTRATION PRODUCTS, W.L. GORE ASSOC., INC.
The U.S. Environmental Protection Agency Air Pollution Control Technology (APCT) Verification Center evaluates the performance of baghouse filtration products used primarily to control PM2.5 emissions. This verification statement summarizes the test results for W.L. Gore & Assoc....
40 CFR 1066.240 - Torque transducer verification and calibration.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.240 Torque transducer verification and calibration. Calibrate torque-measurement systems as described in 40 CFR 1065.310. ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Torque transducer verification and...
40 CFR 1066.240 - Torque transducer verification and calibration.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.240 Torque transducer verification and calibration. Calibrate torque-measurement systems as described in 40 CFR 1065.310. ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Torque transducer verification and...
40 CFR 1066.250 - Base inertia verification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Base inertia verification. 1066.250... CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.250 Base inertia verification. (a) Overview. This section describes how to verify the dynamometer's base inertia. (b) Scope and frequency...
40 CFR 1066.250 - Base inertia verification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Base inertia verification. 1066.250... CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.250 Base inertia verification. (a) Overview. This section describes how to verify the dynamometer's base inertia. (b) Scope and frequency...
40 CFR 1066.250 - Base inertia verification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Base inertia verification. 1066.250... CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.250 Base inertia verification. (a) Overview. This section describes how to verify the dynamometer's base inertia. (b) Scope and frequency...
ETV REPORT AND VERIFICATION STATEMENT - KASELCO POSI-FLO ELECTROCOAGULATION TREATMENT SYSTEM
The Kaselco Electrocoagulation Treatment System (Kaselco system) in combination with an ion exchange polishing system was tested, under actual production conditions, processing metal finishing wastewater at Gull Industries in Houston, Texas. The verification test evaluated the a...
GENERIC VERIFICATION PROTOCOL FOR AQUEOUS CLEANER RECYCLING TECHNOLOGIES
This generic verification protocol has been structured based on a format developed for ETV-MF projects. This document describes the intended approach and explain plans for testing with respect to areas such as test methodology, procedures, parameters, and instrumentation. Also ...
Xue, Xiaonan; Kim, Mimi Y; Castle, Philip E; Strickler, Howard D
2014-03-01
Studies to evaluate clinical screening tests often face the problem that the "gold standard" diagnostic approach is costly and/or invasive. It is therefore common to verify only a subset of negative screening tests using the gold standard method. However, undersampling the screen negatives can lead to substantial overestimation of the sensitivity and underestimation of the specificity of the diagnostic test. Our objective was to develop a simple and accurate statistical method to address this "verification bias." We developed a weighted generalized estimating equation approach to estimate, in a single model, the accuracy (eg, sensitivity/specificity) of multiple assays and simultaneously compare results between assays while addressing verification bias. This approach can be implemented using standard statistical software. Simulations were conducted to assess the proposed method. An example is provided using a cervical cancer screening trial that compared the accuracy of human papillomavirus and Pap tests, with histologic data as the gold standard. The proposed approach performed well in estimating and comparing the accuracy of multiple assays in the presence of verification bias. The proposed approach is an easy to apply and accurate method for addressing verification bias in studies of multiple screening methods. Copyright © 2014 Elsevier Inc. All rights reserved.
This report provides results for the verification testing of the Lead100/AND1000. The following is a description of the technology based on information provided by the vendor. The information provided below was not verified in this test. The ANDalyze Lead100/AND1000 was des...
Standardized Definitions for Code Verification Test Problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doebling, Scott William
This document contains standardized definitions for several commonly used code verification test problems. These definitions are intended to contain sufficient information to set up the test problem in a computational physics code. These definitions are intended to be used in conjunction with exact solutions to these problems generated using Exact- Pack, www.github.com/lanl/exactpack.
Verification and benchmark testing of the NUFT computer code
NASA Astrophysics Data System (ADS)
Lee, K. H.; Nitao, J. J.; Kulshrestha, A.
1993-10-01
This interim report presents results of work completed in the ongoing verification and benchmark testing of the NUFT (Nonisothermal Unsaturated-saturated Flow and Transport) computer code. NUFT is a suite of multiphase, multicomponent models for numerical solution of thermal and isothermal flow and transport in porous media, with application to subsurface contaminant transport problems. The code simulates the coupled transport of heat, fluids, and chemical components, including volatile organic compounds. Grid systems may be cartesian or cylindrical, with one-, two-, or fully three-dimensional configurations possible. In this initial phase of testing, the NUFT code was used to solve seven one-dimensional unsaturated flow and heat transfer problems. Three verification and four benchmarking problems were solved. In the verification testing, excellent agreement was observed between NUFT results and the analytical or quasianalytical solutions. In the benchmark testing, results of code intercomparison were very satisfactory. From these testing results, it is concluded that the NUFT code is ready for application to field and laboratory problems similar to those addressed here. Multidimensional problems, including those dealing with chemical transport, will be addressed in a subsequent report.
Current status of verification practices in clinical biochemistry in Spain.
Gómez-Rioja, Rubén; Alvarez, Virtudes; Ventura, Montserrat; Alsina, M Jesús; Barba, Núria; Cortés, Mariano; Llopis, María Antonia; Martínez, Cecilia; Ibarz, Mercè
2013-09-01
Verification uses logical algorithms to detect potential errors before laboratory results are released to the clinician. Even though verification is one of the main processes in all laboratories, there is a lack of standardization mainly in the algorithms used and the criteria and verification limits applied. A survey in clinical laboratories in Spain was conducted in order to assess the verification process, particularly the use of autoverification. Questionnaires were sent to the laboratories involved in the External Quality Assurance Program organized by the Spanish Society of Clinical Biochemistry and Molecular Pathology. Seven common biochemical parameters were included (glucose, cholesterol, triglycerides, creatinine, potassium, calcium, and alanine aminotransferase). Completed questionnaires were received from 85 laboratories. Nearly all the laboratories reported using the following seven verification criteria: internal quality control, instrument warnings, sample deterioration, reference limits, clinical data, concordance between parameters, and verification of results. The use of all verification criteria varied according to the type of verification (automatic, technical, or medical). Verification limits for these parameters are similar to biological reference ranges. Delta Check was used in 24% of laboratories. Most laboratories (64%) reported using autoverification systems. Autoverification use was related to laboratory size, ownership, and type of laboratory information system, but amount of use (percentage of test autoverified) was not related to laboratory size. A total of 36% of Spanish laboratories do not use autoverification, despite the general implementation of laboratory information systems, most of them, with autoverification ability. Criteria and rules for seven routine biochemical tests were obtained.
Sierra/SolidMechanics 4.48 Verification Tests Manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plews, Julia A.; Crane, Nathan K; de Frias, Gabriel Jose
2018-03-01
Presented in this document is a small portion of the tests that exist in the Sierra / SolidMechanics (Sierra / SM) verification test suite. Most of these tests are run nightly with the Sierra / SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra / SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This documentmore » can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra / SM Example Problems Manual. Note, many other verification tests exist in the Sierra / SM test suite, but have not yet been included in this manual.« less
Sierra/SolidMechanics 4.48 Verification Tests Manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plews, Julia A.; Crane, Nathan K.; de Frias, Gabriel Jose
Presented in this document is a small portion of the tests that exist in the Sierra / SolidMechanics (Sierra / SM) verification test suite. Most of these tests are run nightly with the Sierra / SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra / SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This documentmore » can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra / SM Example Problems Manual. Note, many other verification tests exist in the Sierra / SM test suite, but have not yet been included in this manual.« less
Performance verification testing of the Arkal Pressurized Stormwater Filtration System was conducted under EPA's Environmental Technology Verification Program on a 5.5-acre parking lot and grounds of St. Mary's Hospital in Milwaukee, Wisconsin. The system consists of a water sto...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. ETV seeks to ach...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. ETV seeks to ach...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. ETV seeks to ach...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. ETV seeks to ach...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. The goal of the...
Mutation Testing for Effective Verification of Digital Components of Physical Systems
NASA Astrophysics Data System (ADS)
Kushik, N. G.; Evtushenko, N. V.; Torgaev, S. N.
2015-12-01
Digital components of modern physical systems are often designed applying circuitry solutions based on the field programmable gate array technology (FPGA). Such (embedded) digital components should be carefully tested. In this paper, an approach for the verification of digital physical system components based on mutation testing is proposed. The reference description of the behavior of a digital component in the hardware description language (HDL) is mutated by introducing into it the most probable errors and, unlike mutants in high-level programming languages, the corresponding test case is effectively derived based on a comparison of special scalable representations of the specification and the constructed mutant using various logic synthesis and verification systems.
ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: ENVIROFUELS DIESEL FUEL CATALYZER FUEL ADDITIVE
EPA's Environmental Technology Verification Program has tested EnviroFuels diesel fuel additive, called the Diesel Fuel Catalyzer. EnviroFuels has stated that heavy-duty on and off road diesel engines are the intended market for the catalyzer. Preliminary tests conducted indicate...
AN ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PERFORMANCE TESTING OF FOUR IMMUNOASSAY TEST KITS
The Environmental Technology Verification (ETV) Program, beginning as an initiative of the U.S. Environmental Protection Agency (EPA) in 1995, verifies the performance of commercially available, innovative technologies that can be used to measure environmental quality. The ETV p...
Requirement Assurance: A Verification Process
NASA Technical Reports Server (NTRS)
Alexander, Michael G.
2011-01-01
Requirement Assurance is an act of requirement verification which assures the stakeholder or customer that a product requirement has produced its "as realized product" and has been verified with conclusive evidence. Product requirement verification answers the question, "did the product meet the stated specification, performance, or design documentation?". In order to ensure the system was built correctly, the practicing system engineer must verify each product requirement using verification methods of inspection, analysis, demonstration, or test. The products of these methods are the "verification artifacts" or "closure artifacts" which are the objective evidence needed to prove the product requirements meet the verification success criteria. Institutional direction is given to the System Engineer in NPR 7123.1A NASA Systems Engineering Processes and Requirements with regards to the requirement verification process. In response, the verification methodology offered in this report meets both the institutional process and requirement verification best practices.
A digital flight control system verification laboratory
NASA Technical Reports Server (NTRS)
De Feo, P.; Saib, S.
1982-01-01
A NASA/FAA program has been established for the verification and validation of digital flight control systems (DFCS), with the primary objective being the development and analysis of automated verification tools. In order to enhance the capabilities, effectiveness, and ease of using the test environment, software verification tools can be applied. Tool design includes a static analyzer, an assertion generator, a symbolic executor, a dynamic analysis instrument, and an automated documentation generator. Static and dynamic tools are integrated with error detection capabilities, resulting in a facility which analyzes a representative testbed of DFCS software. Future investigations will ensue particularly in the areas of increase in the number of software test tools, and a cost effectiveness assessment.
Updated Electronic Testbed System
NASA Technical Reports Server (NTRS)
Brewer, Kevin L.
2001-01-01
As we continue to advance in exploring space frontiers, technology must also advance. The need for faster data recovery and data processing is crucial. In this, the less equipment used, and lighter that equipment is, the better. Because integrated circuits become more sensitive in high altitude, experimental verification and quantification is required. The Center for Applied Radiation Research (CARR) at Prairie View A&M University was awarded a grant by NASA to participate in the NASA ER-2 Flight Program, the APEX balloon flight program, and the Student Launch Program. These programs are to test anomalous errors in integrated circuits due to single event effects (SEE). CARR had already begun experiments characterizing the SEE behavior of high speed and high density SRAM's. The research center built a error testing system using a PC-104 computer unit, an Iomega Zip drive for storage, a test board with the components under test, and a latchup detection and reset unit. A test program was written to continuously monitor a stored data pattern in the SRAM chip and record errors. The devices under test were eight 4Mbit memory chips totaling 4Mbytes of memory. CARR was successful at obtaining data using the Electronic TestBed System (EBS) in various NASA ER-2 test flights. These series of high altitude flights of up to 70,000 feet, were effective at yielding the conditions which single event effects usually occur. However, the data received from the series of flights indicated one error per twenty-four hours. Because flight test time is very expensive, the initial design proved not to be cost effective. The need for orders of magnitude with more memory became essential. Therefore, a project which could test more memory within a given time was created. The goal of this project was not only to test more memory within a given time, but also to have a system with a faster processing speed, and which used less peripherals. This paper will describe procedures used to build an updated Electronic Testbed System.
JPL control/structure interaction test bed real-time control computer architecture
NASA Technical Reports Server (NTRS)
Briggs, Hugh C.
1989-01-01
The Control/Structure Interaction Program is a technology development program for spacecraft that exhibit interactions between the control system and structural dynamics. The program objectives include development and verification of new design concepts - such as active structure - and new tools - such as combined structure and control optimization algorithm - and their verification in ground and possibly flight test. A focus mission spacecraft was designed based upon a space interferometer and is the basis for design of the ground test article. The ground test bed objectives include verification of the spacecraft design concepts, the active structure elements and certain design tools such as the new combined structures and controls optimization tool. In anticipation of CSI technology flight experiments, the test bed control electronics must emulate the computation capacity and control architectures of space qualifiable systems as well as the command and control networks that will be used to connect investigators with the flight experiment hardware. The Test Bed facility electronics were functionally partitioned into three units: a laboratory data acquisition system for structural parameter identification and performance verification; an experiment supervisory computer to oversee the experiment, monitor the environmental parameters and perform data logging; and a multilevel real-time control computing system. The design of the Test Bed electronics is presented along with hardware and software component descriptions. The system should break new ground in experimental control electronics and is of interest to anyone working in the verification of control concepts for large structures.
Simulation verification techniques study
NASA Technical Reports Server (NTRS)
Schoonmaker, P. B.; Wenglinski, T. H.
1975-01-01
Results are summarized of the simulation verification techniques study which consisted of two tasks: to develop techniques for simulator hardware checkout and to develop techniques for simulation performance verification (validation). The hardware verification task involved definition of simulation hardware (hardware units and integrated simulator configurations), survey of current hardware self-test techniques, and definition of hardware and software techniques for checkout of simulator subsystems. The performance verification task included definition of simulation performance parameters (and critical performance parameters), definition of methods for establishing standards of performance (sources of reference data or validation), and definition of methods for validating performance. Both major tasks included definition of verification software and assessment of verification data base impact. An annotated bibliography of all documents generated during this study is provided.
EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory
NASA Technical Reports Server (NTRS)
Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.
2012-01-01
As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.
46 CFR 109.227 - Verification of vessel compliance with applicable stability requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Verification of vessel compliance with applicable stability requirements. 109.227 Section 109.227 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.227 Verification...
46 CFR 109.227 - Verification of vessel compliance with applicable stability requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Verification of vessel compliance with applicable stability requirements. 109.227 Section 109.227 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.227 Verification...
46 CFR 109.227 - Verification of vessel compliance with applicable stability requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Verification of vessel compliance with applicable stability requirements. 109.227 Section 109.227 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.227 Verification...
46 CFR 109.227 - Verification of vessel compliance with applicable stability requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Verification of vessel compliance with applicable stability requirements. 109.227 Section 109.227 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.227 Verification...
46 CFR 109.227 - Verification of vessel compliance with applicable stability requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Verification of vessel compliance with applicable stability requirements. 109.227 Section 109.227 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.227 Verification...
46 CFR 131.513 - Verification of compliance with applicable stability requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Verification of compliance with applicable stability...) OFFSHORE SUPPLY VESSELS OPERATIONS Tests, Drills, and Inspections § 131.513 Verification of compliance with applicable stability requirements. (a) After loading but before departure, and at other times necessary to...
46 CFR 131.513 - Verification of compliance with applicable stability requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Verification of compliance with applicable stability...) OFFSHORE SUPPLY VESSELS OPERATIONS Tests, Drills, and Inspections § 131.513 Verification of compliance with applicable stability requirements. (a) After loading but before departure, and at other times necessary to...
46 CFR 131.513 - Verification of compliance with applicable stability requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Verification of compliance with applicable stability...) OFFSHORE SUPPLY VESSELS OPERATIONS Tests, Drills, and Inspections § 131.513 Verification of compliance with applicable stability requirements. (a) After loading but before departure, and at other times necessary to...
The protocol provides generic procedures for implementing a verification test for the performance of in situ chemical oxidation (ISCO), focused specifically to expand the application of ISCO at manufactured gas plants with polyaromatic hydrocarbon (PAH) contamination (MGP/PAH) an...
Application of software technology to automatic test data analysis
NASA Technical Reports Server (NTRS)
Stagner, J. R.
1991-01-01
The verification process for a major software subsystem was partially automated as part of a feasibility demonstration. The methods employed are generally useful and applicable to other types of subsystems. The effort resulted in substantial savings in test engineer analysis time and offers a method for inclusion of automatic verification as a part of regression testing.
40 CFR 1065.362 - Non-stoichiometric raw exhaust FID O2 interference verification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... air source during testing, use zero air as the FID burner's air source for this verification. (4) Zero the FID analyzer using the zero gas used during emission testing. (5) Span the FID analyzer using a span gas that you use during emission testing. (6) Check the zero response of the FID analyzer using...
Developing a Test for Assessing Elementary Students' Comprehension of Science Texts
ERIC Educational Resources Information Center
Wang, Jing-Ru; Chen, Shin-Feng; Tsay, Reuy-Fen; Chou, Ching-Ting; Lin, Sheau-Wen; Kao, Huey-Lien
2012-01-01
This study reports on the process of developing a test to assess students' reading comprehension of scientific materials and on the statistical results of the verification study. A combination of classic test theory and item response theory approaches was used to analyze the assessment data from a verification study. Data analysis indicates the…
Code of Federal Regulations, 2011 CFR
2011-04-01
... EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.4 How does a tribal government, tribal gaming... affects the play of the Class II game be submitted, together with the signature verification required by... to correct a problem affecting the fairness, security, or integrity of a game or accounting system or...
Code of Federal Regulations, 2010 CFR
2010-04-01
... EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.4 How does a tribal government, tribal gaming... affects the play of the Class II game be submitted, together with the signature verification required by... to correct a problem affecting the fairness, security, or integrity of a game or accounting system or...
Code of Federal Regulations, 2012 CFR
2012-04-01
... EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.4 How does a tribal government, tribal gaming... affects the play of the Class II game be submitted, together with the signature verification required by... to correct a problem affecting the fairness, security, or integrity of a game or accounting system or...
Command module/service module reaction control subsystem assessment
NASA Technical Reports Server (NTRS)
Weary, D. P.
1971-01-01
Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.
The purpose of this SOP is to assure suitable temperature maintenance in refrigerators and freezers used for sample storage during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment; refrigerators and freezers.
The U.S.-Mexico Border Program is sponsored...
The purpose of this SOP is to define the steps needed to operate the light pens, and verify the values produced by light pens used in the Arizona NHEXAS project and the "Border" study. Keywords: data; equipment; light pens.
The National Human Exposure Assessment Survey (NHEXAS)...
To Duc, Khanh
2017-11-18
Receiver operating characteristic (ROC) surface analysis is usually employed to assess the accuracy of a medical diagnostic test when there are three ordered disease status (e.g. non-diseased, intermediate, diseased). In practice, verification bias can occur due to missingness of the true disease status and can lead to a distorted conclusion on diagnostic accuracy. In such situations, bias-corrected inference tools are required. This paper introduce an R package, named bcROCsurface, which provides utility functions for verification bias-corrected ROC surface analysis. The shiny web application of the correction for verification bias in estimation of the ROC surface analysis is also developed. bcROCsurface may become an important tool for the statistical evaluation of three-class diagnostic markers in presence of verification bias. The R package, readme and example data are available on CRAN. The web interface enables users less familiar with R to evaluate the accuracy of diagnostic tests, and can be found at http://khanhtoduc.shinyapps.io/bcROCsurface_shiny/ .
Design and Verification of Critical Pressurised Windows for Manned Spaceflight
NASA Astrophysics Data System (ADS)
Lamoure, Richard; Busto, Lara; Novo, Francisco; Sinnema, Gerben; Leal, Mendes M.
2014-06-01
The Window Design for Manned Spaceflight (WDMS) project was tasked with establishing the state-of-art and explore possible improvements to the current structural integrity verification and fracture control methodologies for manned spacecraft windows.A critical review of the state-of-art in spacecraft window design, materials and verification practice was conducted. Shortcomings of the methodology in terms of analysis, inspection and testing were identified. Schemes for improving verification practices and reducing conservatism whilst maintaining the required safety levels were then proposed.An experimental materials characterisation programme was defined and carried out with the support of the 'Glass and Façade Technology Research Group', at the University of Cambridge. Results of the sample testing campaign were analysed, post-processed and subsequently applied to the design of a breadboard window demonstrator.Two Fused Silica glass window panes were procured and subjected to dedicated analyses, inspection and testing comprising both qualification and acceptance programmes specifically tailored to the objectives of the activity.Finally, main outcomes have been compiled into a Structural Verification Guide for Pressurised Windows in manned spacecraft, incorporating best practices and lessons learned throughout this project.
Application of industry-standard guidelines for the validation of avionics software
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J.; Shagnea, Anita M.
1990-01-01
The application of industry standards to the development of avionics software is discussed, focusing on verification and validation activities. It is pointed out that the procedures that guide the avionics software development and testing process are under increased scrutiny. The DO-178A guidelines, Software Considerations in Airborne Systems and Equipment Certification, are used by the FAA for certifying avionics software. To investigate the effectiveness of the DO-178A guidelines for improving the quality of avionics software, guidance and control software (GCS) is being developed according to the DO-178A development method. It is noted that, due to the extent of the data collection and configuration management procedures, any phase in the life cycle of a GCS implementation can be reconstructed. Hence, a fundamental development and testing platform has been established that is suitable for investigating the adequacy of various software development processes. In particular, the overall effectiveness and efficiency of the development method recommended by the DO-178A guidelines are being closely examined.
Comparison of noise reduction systems
NASA Astrophysics Data System (ADS)
Noel, S. D.; Whitaker, R. W.
1991-06-01
When using infrasound as a tool for verification, the most important measurement to determine yield has been the peak-to-peak pressure amplitude of the signal. Therefore, there is a need to operate at the most favorable signal-to-noise ratio (SNR) possible. Winds near the ground can degrade the SNR, thereby making accurate signal amplitude measurement difficult. Wind noise reduction techniques were developed to help alleviate this problem; however, a noise reducing system should reduce the noise, and should not introduce distortion of coherent signals. An experiment is described to study system response for a variety of noise reducing configurations to a signal generated by an underground test (UGT) at the Nevada Test Site (NTS). In addition to the signal, background noise reduction is examined through measurements of variance. Sensors using two particular geometries of noise reducing equipment, the spider and the cross appear to deliver the best SNR. Because the spider configuration is easier to deploy, it is now the most commonly used.
The politics of verification and the control of nuclear tests, 1945-1980
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gallagher, N.W.
1990-01-01
This dissertation addresses two questions: (1) why has agreement been reached on verification regimes to support some arms control accords but not others; and (2) what determines the extent to which verification arrangements promote stable cooperation. This study develops an alternative framework for analysis by examining the politics of verification at two levels. The logical politics of verification are shaped by the structure of the problem of evaluating cooperation under semi-anarchical conditions. The practical politics of verification are driven by players' attempts to use verification arguments to promote their desired security outcome. The historical material shows that agreements on verificationmore » regimes are reached when key domestic and international players desire an arms control accord and believe that workable verification will not have intolerable costs. Clearer understanding of how verification is itself a political problem, and how players manipulate it to promote other goals is necessary if the politics of verification are to support rather than undermine the development of stable cooperation.« less
ETV REPORT AND VERIFICATION STATEMENT; EVALUATION OF LOBO LIQUIDS RINSE WATER RECOVERY SYSTEM
The Lobo Liquids Rinse Water Recovery System (Lobo Liquids system) was tested, under actual production conditions, processing metal finishing wastewater, at Gull Industries in Houston, Texas. The verification test evaluated the ability of the ion exchange (IX) treatment system t...
DOT National Transportation Integrated Search
2005-09-01
This document describes a procedure for verifying a dynamic testing system (closed-loop servohydraulic). The procedure is divided into three general phases: (1) electronic system performance verification, (2) calibration check and overall system perf...
A study of compositional verification based IMA integration method
NASA Astrophysics Data System (ADS)
Huang, Hui; Zhang, Guoquan; Xu, Wanmeng
2018-03-01
The rapid development of avionics systems is driving the application of integrated modular avionics (IMA) systems. But meanwhile it is improving avionics system integration, complexity of system test. Then we need simplify the method of IMA system test. The IMA system supports a module platform that runs multiple applications, and shares processing resources. Compared with federated avionics system, IMA system is difficult to isolate failure. Therefore, IMA system verification will face the critical problem is how to test shared resources of multiple application. For a simple avionics system, traditional test methods are easily realizing to test a whole system. But for a complex system, it is hard completed to totally test a huge and integrated avionics system. Then this paper provides using compositional-verification theory in IMA system test, so that reducing processes of test and improving efficiency, consequently economizing costs of IMA system integration.
NEXT Thruster Component Verification Testing
NASA Technical Reports Server (NTRS)
Pinero, Luis R.; Sovey, James S.
2007-01-01
Component testing is a critical part of thruster life validation activities under NASA s Evolutionary Xenon Thruster (NEXT) project testing. The high voltage propellant isolators were selected for design verification testing. Even though they are based on a heritage design, design changes were made because the isolators will be operated under different environmental conditions including temperature, voltage, and pressure. The life test of two NEXT isolators was therefore initiated and has accumulated more than 10,000 hr of operation. Measurements to date indicate only a negligibly small increase in leakage current. The cathode heaters were also selected for verification testing. The technology to fabricate these heaters, developed for the International Space Station plasma contactor hollow cathode assembly, was transferred to Aerojet for the fabrication of the NEXT prototype model ion thrusters. Testing the contractor-fabricated heaters is necessary to validate fabrication processes for high reliability heaters. This paper documents the status of the propellant isolator and cathode heater tests.
NASA Astrophysics Data System (ADS)
Delay, Jacques; Distinguin, Marc; Dewonck, Sarah
Andra (Agence Nationale pour la Gestion des Déchets Radioactifs - National Radioactive Waste Management Agency) has developed specific tools and methodologies to evaluate and understand the main transport mechanisms of solute species in an argillaceous rock in the framework of the scientific program of the Meuse/Haute-Marne Underground Research Laboratory. This paper focuses on three specific equipments already installed in boreholes for the determination of convection and diffusion parameters in a very low permeability environment. The first one is a specific borehole completion for head and permeability measurements with an integrated wireless telemetry device. In 1995, Andra devised a probe equipped with a pressure sensor to monitor the long-term evolution of electro-magnetically transmitted pore pressures. The data gathered by this first device, and a second one installed in 2001, have shown the occurrence of overpressures in very low permeability formations. The second device is derived from the multipacker system used for monitoring the drainage of the Oxfordian limestone due to the sinking of the shaft above the Callovo-Oxfordian. It is used for obtaining from a single borehole, a pressure profile of the argillaceous formation and its encasing units. To date, the major information obtained with these two borehole equipments is the existence of a 25-35 m anomalous excess hydraulic head in the 130 m thick Callovo-Oxfordian argillaceous formation. Head values in the argillaceous rock exceed those in the overlying Oxfordian limestone by 25-35 m, and those in the underlying Dogger by over 45 m. The third equipment described in the paper, is derived from the experiment carried out at the Mont Terri rock laboratory since 1996 for the characterization of diffusion and retention processes. The system is adapted for a borehole drilled from the surface. The objectives of this experiment are as follows: Verification of the predominant role played by molecular diffusion compared with convection; Acquisition of data required to extrapolate and /or interpolate chemical retention and diffusion parameters. The diffusion test performed from the borehole makes it possible to test in situ a small number of tracers (HTO, 36Cl, 134Cs) at a scale of 10 cm for the non sorbing tracers.
A Software Defined Radio Based Airplane Communication Navigation Simulation System
NASA Astrophysics Data System (ADS)
He, L.; Zhong, H. T.; Song, D.
2018-01-01
Radio communication and navigation system plays important role in ensuring the safety of civil airplane in flight. Function and performance should be tested before these systems are installed on-board. Conventionally, a set of transmitter and receiver are needed for each system, thus all the equipment occupy a lot of space and are high cost. In this paper, software defined radio technology is applied to design a common hardware communication and navigation ground simulation system, which can host multiple airplane systems with different operating frequency, such as HF, VHF, VOR, ILS, ADF, etc. We use a broadband analog frontend hardware platform, universal software radio peripheral (USRP), to transmit/receive signal of different frequency band. Software is compiled by LabVIEW on computer, which interfaces with USRP through Ethernet, and is responsible for communication and navigation signal processing and system control. An integrated testing system is established to perform functional test and performance verification of the simulation signal, which demonstrate the feasibility of our design. The system is a low-cost and common hardware platform for multiple airplane systems, which provide helpful reference for integrated avionics design.
NASA Technical Reports Server (NTRS)
Clark, E. C.
1975-01-01
Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.
1999-02-11
KENNEDY SPACE CENTER, FLA. -- In the SPACEHAB Facility for a payload Interface Verification Test (IVT) for their upcoming mission to the International Space Station are (left to right) Mission Specialists Valery Tokarev, Julie Payette (holding a lithium hydroxide canister) and Dan Barry. Other crew members at KSC for the IVT are Commander Kent Rominger, Pilot Rick Husband and Mission Specialists Ellen Ochoa and Tamara Jernigan. Mission STS-96 carries the SPACEHAB Logistics Double Module, which has equipment to further outfit the International Space Station service module and equipment that can be off-loaded from the early U.S. assembly flights. The SPACEHAB carries internal logistics and resupply cargo for station outfitting, plus an external Russian cargo crane to be mounted to the exterior of the Russian station segment and used to perform space walking maintenance activities. The double module stowage provides capacity of up to 10,000 lbs. with the ability to accommodate powered payloads, four external rooftop stowage locations, four double-rack locations (two powered), up to 61 bulkhead-mounted middeck locker locations, and floor storage for large unique items and Soft Stowage. STS-96 is targeted to launch May 20 about 9:32 a.m
NASA Technical Reports Server (NTRS)
Chen, I. Y.; Ungar, E. K.; Lee, D. Y.; Beckstrom, P. S.
1993-01-01
To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.
40 CFR 1065.545 - Verification of proportional flow control for batch sampling.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control for batch sampling. 1065.545 Section 1065.545 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Performing an Emission Test Over Specified Duty Cycles § 1065.545 Verification of proportional flow control for batch sampling. For any...
42 CFR 493.1253 - Standard: Establishment and verification of performance specifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Establishment and verification of..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY REQUIREMENTS... of test results for the test system. (vi) Reference intervals (normal values). (vii) Any other...
A 3DHZETRN Code in a Spherical Uniform Sphere with Monte Carlo Verification
NASA Technical Reports Server (NTRS)
Wilson, John W.; Slaba, Tony C.; Badavi, Francis F.; Reddell, Brandon D.; Bahadori, Amir A.
2014-01-01
The computationally efficient HZETRN code has been used in recent trade studies for lunar and Martian exploration and is currently being used in the engineering development of the next generation of space vehicles, habitats, and extra vehicular activity equipment. A new version (3DHZETRN) capable of transporting High charge (Z) and Energy (HZE) and light ions (including neutrons) under space-like boundary conditions with enhanced neutron and light ion propagation is under development. In the present report, new algorithms for light ion and neutron propagation with well-defined convergence criteria in 3D objects is developed and tested against Monte Carlo simulations to verify the solution methodology. The code will be available through the software system, OLTARIS, for shield design and validation and provides a basis for personal computer software capable of space shield analysis and optimization.
Application of an ADS-B Sense and Avoid Algorithm
NASA Technical Reports Server (NTRS)
Arteaga, Ricardo; Kotcher, Robert; Cavalin, Moshe; Dandachy, Mohammed
2016-01-01
The National Aeronautics and Space Administration Armstrong Flight Research Center in Edwards, California is leading a program aimed towards integrating unmanned aircraft system into the national airspace system (UAS in the NAS). The overarching goal of the program is to reduce technical barriers associated with related safety issues as well as addressing challenges that will allow UAS routine access to the national airspace. This research paper focuses on three novel ideas: (1) A design of an integrated UAS equipped with Automatic Dependent Surveillance-Broadcast that constructs a more accurate state-based airspace model; (2) The use of Stratway Algorithm in a real-time environment; and (3) The verification and validation of sense and avoid performance and usability test results which provide a pilot's perspective on how our system will benefit the UAS in the NAS program for both piloted and unmanned aircraft.
Bias in estimating accuracy of a binary screening test with differential disease verification
Brinton, John T.; Ringham, Brandy M.; Glueck, Deborah H.
2011-01-01
SUMMARY Sensitivity, specificity, positive and negative predictive value are typically used to quantify the accuracy of a binary screening test. In some studies it may not be ethical or feasible to obtain definitive disease ascertainment for all subjects using a gold standard test. When a gold standard test cannot be used an imperfect reference test that is less than 100% sensitive and specific may be used instead. In breast cancer screening, for example, follow-up for cancer diagnosis is used as an imperfect reference test for women where it is not possible to obtain gold standard results. This incomplete ascertainment of true disease, or differential disease verification, can result in biased estimates of accuracy. In this paper, we derive the apparent accuracy values for studies subject to differential verification. We determine how the bias is affected by the accuracy of the imperfect reference test, the percent who receive the imperfect reference standard test not receiving the gold standard, the prevalence of the disease, and the correlation between the results for the screening test and the imperfect reference test. It is shown that designs with differential disease verification can yield biased estimates of accuracy. Estimates of sensitivity in cancer screening trials may be substantially biased. However, careful design decisions, including selection of the imperfect reference test, can help to minimize bias. A hypothetical breast cancer screening study is used to illustrate the problem. PMID:21495059
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weaver, Phyllis C.
A team from ORAU's Independent Environmental Assessment and Verification Program performed verification survey activities on the South Test Tower and four Hazardous Waste Storage Lockers. Scan data collected by ORAU determined that both the alpha and alpha-plus-beta activity was representative of radiological background conditions. The count rate distribution showed no outliers that would be indicative of alpha or alpha-plus-beta count rates in excess of background. It is the opinion of ORAU that independent verification data collected support the site?s conclusions that the South Tower and Lockers sufficiently meet the site criteria for release to recycle and reuse.
76 FR 60829 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Authorization-Verification (Retention of Records). Form No.: N/A. Type of Review: Extension of a currently... verification, the responsible party, as shown in 47 CFR 2.909 shall maintain the records listed as follows: (1... laboratory, company, or individual performing the verification testing. The Commission may request additional...
Verification testing of the Stormwater Management, Inc. StormFilter Using ZPG Filter Media was conducted on a 0.19 acre portion of the eastbound highway surface of Interstate 794, at an area commonly referred to as the "Riverwalk" site near downtown Milwaukee, Wisconsin...
The U.S. Environmental Protection Agency (EPA) has created the Environmental Technology Verification (ETV) Program to facilitate the deployment of innovative or improved environmental technologies through performance verification and dissemination of information. ETV seeks to ach...
This protocol was developed under the Environmental Protection Agency's Environmental Technology Verification (ETV) Program, and is intended to be used as a guide in preparing laboratory test plans for the purpose of verifying the performance of grouting materials used for infra...
The verification testing was conducted at the Cl facility in North Las Vegas, NV, on July 17 and 18, 2001. During this period, engine emissions, fuel consumption, and fuel quality were evaluated with contaminated and cleaned fuel.
To facilitate this verification, JCH repre...
Verification tests of durable TPS concepts
NASA Technical Reports Server (NTRS)
Shideler, J. L.; Webb, G. L.; Pittman, C. M.
1984-01-01
Titanium multiwall, superalloy honeycomb, and Advanced Carbon-carbon (ACC) multipost Thermal Protection System (TPS) concepts are being developed to provide durable protection for surfaces of future space transportation systems. Verification tests including thermal, vibration, acoustic, water absorption, lightning strike, and aerothermal tests are described. Preliminary results indicate that the three TPS concepts are viable up to a surface temperature in excess of 2300 F.
Integrity verification testing of the ADI International Inc. Pilot Test Unit No. 2002-09 with MEDIA G2® arsenic adsorption media filter system was conducted at the Hilltown Township Water and Sewer Authority (HTWSA) Well Station No. 1 in Sellersville, Pennsylvania from October 8...
Review of waste package verification tests. Semiannual report, October 1982-March 1983
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soo, P.
1983-08-01
The current study is part of an ongoing task to specify tests that may be used to verify that engineered waste package/repository systems comply with NRC radionuclide containment and controlled release performance objectives. Work covered in this report analyzes verification tests for borosilicate glass waste forms and bentonite- and zeolite-based packing mateials (discrete backfills). 76 references.
NASA Technical Reports Server (NTRS)
1998-01-01
This handbook establishes NASA program requirements for evaluation, testing, and selection of materials to preclude unsafe conditions related to flammability, odor, offgassing, and fluid compatibility. Materials intended for use in space vehicles, specified test facilities, and specified ground support equipment (GSE) must meet the requirements of this document. Additional materials performance requirements may be specified in other program or NASA center specific documentation. Responsible NASA centers materials organizations must include applicable requirements of this document in their materials control programs. Materials used in habitable areas of spacecraft, including the materials of the spacecraft, stowed equipment, and experiments, must be evaluated for flammability, odor, and offgassing characteristics. All materials used in other areas must be evaluated for flammability characteristics. In addition, materials that are exposed to liquid oxygen (LOX), gaseous oxygen (GOX), and other reactive fluids' must be evaluated for compatibility with the fluid in their use application. Materials exposed to pressurized breathing gases also must be evaluated for odor and offgassing characteristics. The worst-case anticipated use environment (most hazardous pressure, temperature, material thickness, and fluid exposure conditions) must be used in the evaluation process. Materials that have been shown to meet the criteria of the required tests are acceptable for further consideration in design. Whenever possible, materials should be selected that have already been shown to meet the test criteria in the use environment. Existing test data are compiled in the NASA Marshall Space Flight Center (MSFC) Materials and Processes Technical Information System (MAPTIS) and published periodically as the latest revision of a joint document with Johnson Space Center (JSC), MSFC-HDBK-527/JSC 09604. MAPTIS can be accessed by computer datalink. Systems containing materials that have not been tested or do not meet the criteria of the required tests must be verified to be acceptable in the use configuration by analysis or testing. This verification rationale must be documented and submitted to the responsible NASA center materials organization for approval.
The paper discusses the test design for environmental technology verification (ETV) of add-0n nitrogen oxides (NOx) control utilizing ozone injection. (NOTE: ETV is an EPA-established program to enhance domestic and international market acceptance of new or improved commercially...
E-waste management and sustainability: a case study in Brazil.
Azevedo, Luís Peres; da Silva Araújo, Fernando Gabriel; Lagarinhos, Carlos Alberto Ferreira; Tenório, Jorge Alberto Soares; Espinosa, Denise Crocce Romano
2017-11-01
The advancement of technology and development of new electronic and electrical equipment with a reduced life cycle has increased the need for the disposal of them (called Waste of Electric and Electronic Equipment or simply e-waste) due to defects presented during use, replacement of obsolete equipment, and ease of acquisition of new equipment. There is a lack of consumer awareness regarding the use, handling storage, and disposal of this equipment. In Brazil, the disposal of post-consumer waste is regulated by the National Solid Waste Policy, established by Law No. 12305 and regulated on the 23rd December 2010. Under this legislation, manufacturers and importers are required to perform a project for the Reverse Logistics of e-waste, though its implementation is not well defined. This work focuses on the verification of the sustainability of reverse logistics suggested by the legislation and the mandatory points, evaluating its costs and the possible financial gain with recycling of the waste. The management of reverse logistics and recycling of waste electrical and electronic equipment, or simply recycling of e-waste, as suggested by the government, will be the responsibility of the managing organization to be formed by the manufacturers/importers in Brazil.
Development of a Hand Held Thromboelastograph
2015-01-01
documents will be referenced during the Entegrion PCM System design, verification and validation activities. EN 61010 -1:2010 (Edition3.0) Safety...requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements. EN 61010 -2-101:2002 Safety...IPC-A-610E Acceptability of Electronic Assemblies IPC 7711/21B Rework, Modification and Repair of Electronic Assemblies. IEC 62304:2006/AC:2008