Sample records for erip evaluation projects

  1. Proposal for an Early Retirement Incentive Program at Mercer County Community College.

    ERIC Educational Resources Information Center

    Schwartz, Arthur E.

    A project was undertaken to evaluate existing models of early retirement incentive programs (ERIPs) and recommend an ERIP for New Jersey's Mercer County Community College (MCCC). The following categories of ERIPs were reviewed: state plans for New York and Minnesota; K-12 school districts plans at the Castro Valley Unified School District and 48…

  2. The Economic, Energy, and Environmental Impacts of the Energy-Related Inventions Program

    DOE R&D Accomplishments Database

    Brown, M.A.; Wilson, C.R.; Franchuk, C.A.; Cohn, S.M.; Jones, D.

    1994-07-01

    This report provides information on the economic, energy, and environmental impacts of inventions supported by the Energy-Related Inventions Program (ERIP) -- a program jointly operated by the US Department of Energy and the National Institute of Standards and Technology (NIST). It describes the results of the latest in a series of ERIP evaluation projects that have been completed since 1980. The period of interest is 1980 through 1992. The evaluation is based on data collected in 1993 through mail and telephone surveys of 253 program participants, and historical data collected during previous evaluations for an additional 189 participants.

  3. ERIP Project No. 670, Nevada Energy Control Systems, Inc.. Final techincal progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimber, D.J.

    1998-02-11

    In order to gauge the effectiveness of the ERIP Project No. 670, Nevada Energy Control Systems, Inc., Grant Number DE-FG01-96EE15670, the Statement of Work must be compared to the achievements by NECSI during the grant period. The following report reflects the aforementioned statement and is coordinated directly with it. The project goal is to gather data and test in order to validate earlier tests of energy savings,safety,reliability and practicality of the NECSI Evaporator Fan Controller in order to fully commercialize and market the product.

  4. Quantitative and theoretical analysis of the joint Department of Energy-National Institute of Standards and Technology Energy-Related Inventions Program from 1975 to 1995: Implications for development of public policy toward innovation

    NASA Astrophysics Data System (ADS)

    Pevenstein, Jack Edward

    This dissertation presents 18 alternative models for computing the social rate of return (SRR) of the joint Department of Energy (DOE)-National Institute of Standards and Technology (NIST) Energy-Related Inventions Program (ERIP) from 1975 to 1995. The models differ on the on the choice of societal benefit, adjustments made to the benefits, accounting for initial investments in ERIP and annual program appropriations. Alternative quantitative measures of societal benefit include annual gross market sales of successfully commercialized ERIP-supported inventions, annual energy savings resulting from the use of such inventions, pollution-remediation cost reductions due to decreased carbon emissions from greenhouse gases associated with more efficient energy generation. SRR computation employs the net present value (NPV) model with the SRR being the discount rate that reduces the NPV of a stream of societal benefits to zero over a period of n years given an initial investment and annual program appropriations. The SRR is the total rate of return to the nation from public investment in ERIP. The data used for computation were assembled by Dr. Marilyn A. Brown and her staff at Oak Ridge National Laboratory under contract to DOE since 1985. Other data on energy use and carbon emission from greenhouse gas production come from official publications of DOE's Energy Information Administration. Mean ERIP SRR = 412.7% with standard deviation = +/-426.5%. The population of the SRR sample is accepted as normally distributed at an alpha = 0.05, using the Kolmogorov-Smirnov test. These SRR's, which appear reasonable in comparison with those computed by Professor Edwin Mansfield, (Wharton School) for inventions and by Dr. Gregory Tassey (NIST Chief Economist) for NIST programs supporting innovations in measurement technology, show a significant underinvestment in public service technology innovation evaluation programs for independent inventors and small technology-oriented businesses. Moreover, it is argued that ERIP [with its participants] is a good representation of a larger community of independent inventors and innovators comprising a resource the writer calls the "national innovation infrastructure." This national innovation infrastructure, like ERIP, is underinvested in terms of public support. Thus, the nation would benefit from a large-scale, value-adding, public-service innovative technology evaluation program modeled on ERIP. Further, support of such technology evaluation programs at both state and Federal levels should be an important priority of public technology policy.

  5. Man-machine interfaces in LACIE/ERIPS

    NASA Technical Reports Server (NTRS)

    Duprey, B. B. (Principal Investigator)

    1979-01-01

    One of the most important aspects of the interactive portion of the LACIE/ERIPS software system is the way in which the analysis and decision-making capabilities of a human being are integrated with the speed and accuracy of a computer to produce a powerful analysis system. The three major man-machine interfaces in the system are (1) the use of menus for communications between the software and the interactive user; (2) the checkpoint/restart facility to recreate in one job the internal environment achieved in an earlier one; and (3) the error recovery capability which would normally cause job termination. This interactive system, which executes on an IBM 360/75 mainframe, was adapted for use in noninteractive (batch) mode. A case study is presented to show how the interfaces work in practice by defining some fields based on an image screen display, noting the field definitions, and obtaining a film product of the classification map.

  6. Impact of an Early Retirement Program: A Case Analysis of a Community College.

    ERIC Educational Resources Information Center

    Roman, Lawrence Allen

    This case study examines the impact of Early Retirement Incentive Programs (ERIP) on Ohio's two-year public colleges through a single case study analysis at Monticello Community College. Data came from interviews and an examination of college documents. This study specifically sought to address: (1) the financial impact (savings versus costs) of…

  7. Experiment Requirements and Implementation Plan (ERIP) for semiconductor materials growth in low-G environment experiment no. MPS-77F087

    NASA Technical Reports Server (NTRS)

    Crouch, R. K.; Fripp, A. L.; Debnam, W. J.; Clark, I. O.

    1981-01-01

    Crystals of the intermetallic compound Pb1-xSnxTe will be grown in furnaces on the Space Shuttle. The reasons for conducting this growth in space, the program of investigation to develop the space experiment and the requirements that are placed on the Space Shuttle furnace are discussed. Also included are relevent thermophysical properties of Pb1-xSnxTe to the degree which they are known.

  8. Experiment requirements and implementation plan (Erip) for semiconductor materials growth in low-G environment

    NASA Technical Reports Server (NTRS)

    Crouch, R. K.; Fripp, A. L.; Debnam, W. J.; Clark, I. O.

    1983-01-01

    The MEA-2 A facility was used to test the effect of the low gravity environment on suppressing convective mixing in the growth of Pb(1-x)Sn(x)Te crystals. The need to eliminate convection, the furnace characteristics and operation that will be required for successful experimental implementation, and to the level that is presently known, the measured physical properties of the Pb(1-x)Sn(x)Te system were discussed. In addition, a brief background of the present and potential utilization of Pb(1-x)Sn(x)Te is given. Additional experiments are anticipated in future MEA-A, improved MEA and other dedicated materials processing in space flight apparatus.

  9. Diospyrin derivative, an anticancer quinonoid, regulates apoptosis at endoplasmic reticulum as well as mitochondria by modulating cytosolic calcium in human breast carcinoma cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kumar, Binod; Radiation and Cancer Biology Section, Radiation Biology and Health Sciences Division, Bhabha Atomic Research Centre, Mumbai 400085; Kumar, Amit

    2012-01-13

    Highlights: Black-Right-Pointing-Pointer Diospyrin diethylether (D7) caused oxidative stress-dependent activation of PC-PLC. Black-Right-Pointing-Pointer Activated PC-PLC induced a sustained-release of Ca{sup 2+} from endoplasmic reticulum. Black-Right-Pointing-Pointer The elevated cytosolic Ca{sup +2} led to the calpain-caspase12 dependent apoptosis. Black-Right-Pointing-Pointer D7-Induced Ca{sup +2} also found to accentuate the mitochondrial pathway of apoptosis. -- Abstract: Diospyrin diethylether (D7), a bisnaphthoquinonoid derivative, exhibited an oxidative stress-dependent apoptosis in several human cancer cells and tumor models. The present study was aimed at evaluation of the increase in cytosolic calcium [Ca{sup 2+}]{sub c} leading to the apoptotic cell death triggered by D7 in MCF7 human breast carcinoma cells.more » A phosphotidylcholine-specific phospholipase C (PC-PLC) inhibitor, viz. U73122, and an antioxidant, viz. N-acetylcysteine, could significantly prevent the D7-induced rise in [Ca{sup 2+}]{sub c} and PC-PLC activity. Using an endoplasmic reticulum (ER)-Ca{sup 2+} mobilizer (thapsigargin) and an ER-IP3R antagonist (heparin), results revealed ER as a major source of [Ca{sup 2+}]{sub c} which led to the activation of calpain and caspase12, and cleavage of fodrin. These effects including apoptosis were significantly inhibited by the pretreatment of Bapta-AM (a cell permeable Ca{sup 2+}-specific chelator), or calpeptin (a calpain inhibitor). Furthermore, D7-induced [Ca{sup 2+}]{sub c} was found to alter mitochondrial membrane potential and induce cytochrome c release, which was inhibited by either Bapta-AM or ruthenium red (an inhibitor of mitochondrial Ca{sup 2+} uniporter). Thus, these results provided a deeper insight into the D7-induced redox signaling which eventually integrated the calcium-dependent calpain/caspase12 activation and mitochondrial alterations to accentuate the induction of apoptotic cell death.« less

  10. 23 CFR 505.11 - Project evaluation and rating.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MANAGEMENT PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING § 505.11 Project evaluation and rating. (a) The Secretary shall evaluate and rate each proposed project as “highly recommended... 23 Highways 1 2010-04-01 2010-04-01 false Project evaluation and rating. 505.11 Section 505.11...

  11. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  12. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  13. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. Evaluating a collaborative IT based research and development project.

    PubMed

    Khan, Zaheer; Ludlow, David; Caceres, Santiago

    2013-10-01

    In common with all projects, evaluating an Information Technology (IT) based research and development project is necessary in order to discover whether or not the outcomes of the project are successful. However, evaluating large-scale collaborative projects is especially difficult as: (i) stakeholders from different countries are involved who, almost inevitably, have diverse technological and/or application domain backgrounds and objectives; (ii) multiple and sometimes conflicting application specific and user-defined requirements exist; and (iii) multiple and often conflicting technological research and development objectives are apparent. In this paper, we share our experiences based on the large-scale integrated research project - The HUMBOLDT project - with project duration of 54 months, involving contributions from 27 partner organisations, plus 4 sub-contractors from 14 different European countries. In the HUMBOLDT project, a specific evaluation methodology was defined and utilised for the user evaluation of the project outcomes. The user evaluation performed on the HUMBOLDT Framework and its associated nine application scenarios from various application domains, resulted in not only an evaluation of the integrated project, but also revealed the benefits and disadvantages of the evaluation methodology. This paper presents the evaluation methodology, discusses in detail the process of applying it to the HUMBOLDT project and provides an in-depth analysis of the results, which can be usefully applied to other collaborative research projects in a variety of domains. Copyright © 2013 Elsevier Ltd. All rights reserved.

  15. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    PubMed

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    NASA Astrophysics Data System (ADS)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  17. Evaluation of Title I ESEA Projects: 1975-76.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Evaluation services to be provided during 1975-76 to projects funded under the Elementary and Secondary Education Act Title I are listed in this annual booklet. For each project, the following information is provided: goals to be assessed, evaluation techniques (design), and evaluation milestones. Regular term and summer term projects reported on…

  18. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  19. Designing an External Evaluation of a Large-Scale Software Development Project.

    ERIC Educational Resources Information Center

    Collis, Betty; Moonen, Jef

    This paper describes the design and implementation of the evaluation of the POCO Project, a large-scale national software project in the Netherlands which incorporates the perspective of an evaluator throughout the entire span of the project, and uses the experiences gained from it to suggest an evaluation procedure that could be applied to other…

  20. Grey Comprehensive Evaluation of Biomass Power Generation Project Based on Group Judgement

    NASA Astrophysics Data System (ADS)

    Xia, Huicong; Niu, Dongxiao

    2017-06-01

    The comprehensive evaluation of benefit is an important task needed to be carried out at all stages of biomass power generation projects. This paper proposed an improved grey comprehensive evaluation method based on triangle whiten function. To improve the objectivity of weight calculation result of only reference comparison judgment method, this paper introduced group judgment to the weighting process. In the process of grey comprehensive evaluation, this paper invited a number of experts to estimate the benefit level of projects, and optimized the basic estimations based on the minimum variance principle to improve the accuracy of evaluation result. Taking a biomass power generation project as an example, the grey comprehensive evaluation result showed that the benefit level of this project was good. This example demonstrates the feasibility of grey comprehensive evaluation method based on group judgment for benefit evaluation of biomass power generation project.

  1. [Transparency as a prerequisite of innovation in health services research: deficits in the reporting of model projects concerning managed care].

    PubMed

    Wiethege, J; Ommen, O; Ernstmann, N; Pfaff, H

    2010-10-01

    Currently, elements of managed care are being implemented in the German health-care system. The legal basis for these innovations are § 140, § 73, § 137, and §§ 63 et seq. of the German Social Code - Part 5 (SGB V). For the model projects according to §§ 63 et seq. of the German Social Code a scientific evaluation and publication of the evaluation results is mandatory. The present study examines the status of evaluation of German model projects. The present study has a mixed method design: A mail and telephone survey with the German Federal Social Insurance Authority, the health insurance funds, and the regional Associations of Statutory Health Insurance Physicians has been conducted. Furthermore, an internet research on "Medpilot" and "Google" has been accomplished to search for model projects and their evaluation reports. 34 model projects met the inclusion criteria. 13 of these projects had been terminated up to 30/9/2008. 6 of them have published an evaluation report. 4 model projects have published substantial documents. One model project in progress has published a meaningful interim report. 12 model projects failed to give information concerning the evaluator or the duration of the model projects. The results show a significant deficit in the mandatory reporting of the evaluation of model projects in Germany. There is a need for action for the legislator and the health insurance funds in terms of promoting the evaluation and the publication of the results. The institutions evaluating the model projects should obligate themselves to publish the evaluation results. The publication is an essential precondition for the development of managed care structures in the health-care system and in the development of scientific evaluation methods. © Georg Thieme Verlag KG Stuttgart · New York.

  2. Risk evaluation of highway engineering project based on the fuzzy-AHP

    NASA Astrophysics Data System (ADS)

    Yang, Qian; Wei, Yajun

    2011-10-01

    Engineering projects are social activities, which integrate with technology, economy, management and organization. There are uncertainties in each respect of engineering projects, and it needs to strengthen risk management urgently. Based on the analysis of the characteristics of highway engineering, and the study of the basic theory on risk evaluation, the paper built an index system of highway project risk evaluation. Besides based on fuzzy mathematics principle, analytical hierarchy process was used and as a result, the model of the comprehensive appraisal method of fuzzy and AHP was set up for the risk evaluation of express way concessionary project. The validity and the practicability of the risk evaluation of expressway concessionary project were verified after the model was applied to the practice of a project.

  3. The Employment Impact of the Des Moines Occupational Upgrading Project and Model Cities High School Equivalency Project: Project Year One Evaluation.

    ERIC Educational Resources Information Center

    Palomba, Neil A.; And Others

    This study was conducted to: (1) evaluate the Occupational Upgrading Project (OUP) and the Model Neighborhood High School Equivalency (HSE) Project's first year of operation, and (2) create baseline data from which future and more conclusive evaluation can be undertaken. Data were gathered by conducting open-ended interviews with the…

  4. Linking Project Evaluation and Goals-Based Teacher Evaluation: Evaluating the Accelerated Schools Project in South Carolina.

    ERIC Educational Resources Information Center

    Finnan, Christine; Davis, Sara Calhoun

    This paper describes efforts to design an evaluation system that has as its primary objective helping schools effect positive change through the Accelerated Schools Project. Three characteristics were deemed essential: (1) that the evaluation be useful and meaningful; (2) that it be sensitive to local conditions; and (3) that evaluations of…

  5. Projection pursuit water quality evaluation model based on chicken swam algorithm

    NASA Astrophysics Data System (ADS)

    Hu, Zhe

    2018-03-01

    In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.

  6. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  7. Project Pride Evaluation Report.

    ERIC Educational Resources Information Center

    Jennewein, Marilyn; And Others

    Project PRIDE (Probe, Research, Inquire, Discover, and Evaluate) is evaluated in this report to provide data to be used as a learning tool for project staff and student participants. Major objectives of the project are to provide an inter-disciplinary, objective approach to the study of the American heritage, and to incorporate methods and…

  8. Creating Robust Evaluation of ATE Projects

    ERIC Educational Resources Information Center

    Eddy, Pamela L.

    2017-01-01

    Funded grant projects all involve some form of evaluation, and Advanced Technological Education (ATE) grants are no exception. Program evaluation serves as a critical component not only for evaluating if a project has met its intended and desired outcomes, but the evaluation process is also a central feature of the grant application itself.…

  9. Evaluation of a proposed expert system development methodology: Two case studies

    NASA Technical Reports Server (NTRS)

    Gilstrap, Lewey

    1990-01-01

    Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.

  10. Adult Education and Learning in Europe: Evaluation of the Adult Education Action within the SOCRATES Programme. Final Report of the Project "MOPED--Monitoring of Projects: Evaluation as Dialogue."

    ERIC Educational Resources Information Center

    Nuissl, Ekkehard, Ed.

    The SOCRATES Program was conducted in 1995-1999 to increase transnational cooperation between institutions in the field of adult education (AE) and thereby enhance the quality of AE in Europe. In 1997, a project called Monitoring of Projects: Evaluation as Dialogue (MOPED) was conducted to evaluate the effectiveness of 101 transnational…

  11. Exploring the Impact of Telecollaboration in Initial Teacher Education: The EVALUATE Project

    ERIC Educational Resources Information Center

    O'Dowd, Robert

    2017-01-01

    This article provides an introduction to the EVALUATE project (Evaluating and Upscaling Telecollaborative Teacher Education). This project aims to gauge the impact of telecollaborative learning on student-teachers involved in Initial Teacher Education in various European countries and regions. The project is funded by the Erasmus+ KA3 programme…

  12. Evaluation of Project Symbiosis: An Interdisciplinary Science Education Project.

    ERIC Educational Resources Information Center

    Altschuld, James W.

    1993-01-01

    The goal of this report is to provide a summary of the evaluation of Project Symbiosis which focused on enhancing the teaching of science principles in high school agriculture courses. The project initially involved 15 teams of science and agriculture teachers and was characterized by an extensive evaluation component consisting of six formal…

  13. Design Alternatives for Evaluating the Impact of Conservation Projects

    ERIC Educational Resources Information Center

    Margoluis, Richard; Stem, Caroline; Salafsky, Nick; Brown, Marcia

    2009-01-01

    Historically, examples of project evaluation in conservation were rare. In recent years, however, conservation professionals have begun to recognize the importance of evaluation both for accountability and for improving project interventions. Even with this growing interest in evaluation, the conservation community has paid little attention to…

  14. Project Sell, Title VII: Final Evaluation 1970-1971.

    ERIC Educational Resources Information Center

    Condon, Elaine C.; And Others

    This evaluative report consists of two parts. The first is a narrative report which represents a summary by the evaluation team and recommendations regarding project activities; the second part provides a statistical analysis of project achievements. Details are provided on evaluation techniques, staff, management, instructional materials,…

  15. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    ERIC Educational Resources Information Center

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  16. Has computational creativity successfully made it "Beyond the Fence" in musical theatre?

    NASA Astrophysics Data System (ADS)

    Jordanous, Anna

    2017-10-01

    A significant test for software is to task it with replicating human performance, as done recently with creative software and the commercial project Beyond the Fence (undertaken for a television documentary Computer Says Show). The remit of this project was to use computer software as much as possible to produce "the world's first computer-generated musical". Several creative systems were used to generate this musical, which was performed in London's West End in 2016. This paper considers the challenge of evaluating this project. Current computational creativity evaluation methods are ill-suited to evaluating projects that involve creative input from multiple systems and people. Following recent inspiration within computational creativity research from interaction design, here the DECIDE evaluation framework is applied to evaluate the Beyond the Fence project. Evaluation finds that the project was reasonably successful at achieving the task of using computational generation to produce a credible musical. Lessons have been learned for future computational creativity projects though, particularly for affording creative software more agency and enabling software to interact with other creative partners. Upon reflection, the DECIDE framework emerges as a useful evaluation "checklist" (if not a tangible operational methodology) for evaluating multiple creative systems participating in a creative task.

  17. Multilevel Evaluation Systems Project. Final Report.

    ERIC Educational Resources Information Center

    Herman, Joan L.

    Several studies were conducted in 1987 by the Multilevel Evaluation Systems Project, which focuses on developing a model for a multi-purpose, multi-user evaluation system to facilitate educational decision making and evaluation. The project model emphasizes on-going integrated assessment of individuals, classes, and programs using a variety of…

  18. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    PubMed

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  19. Regional Interstate Planning Project Program . . . Vol. IX. California Program Evaluation Improvement Project. Seminar Report.

    ERIC Educational Resources Information Center

    Dearmin, Evalyn, Ed.; And Others

    Program evaluation strategies and techniques based on materials developed by the California Evaluation Improvement Project were discussed at this meeting of the Regional Interstate Planning Project (RIPP). RIPP members represent the State Departments of Education of ten western states, and have met periodically over the past nine years to discuss…

  20. Modelling in Evaluating a Working Life Project in Higher Education

    ERIC Educational Resources Information Center

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  1. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  2. Finding the Forest Amid the Trees: Tools for Evaluating Astronomy Education and Public Outreach Projects

    ERIC Educational Resources Information Center

    Bailey, Janelle M.; Slater, Timothy F.

    2004-01-01

    The effective evaluation of educational projects is becoming increasingly important to funding agencies and to the individuals and organizations involved in the projects. This brief "how-to" guide provides an introductory description of the purpose and basic ideas of project evaluation, and uses authentic examples from four different astronomy and…

  3. Evaluation of a primary school drug drama project: methodological issues and key findings.

    PubMed

    Starkey, F; Orme, J

    2001-10-01

    This paper describes the impact evaluation of a primary school drug drama project developed by a health promotion service and a theatre's education department in England. The project targeted 10-11 year olds in 41 schools with an interactive drama production and workshop day on attitudes, choices, decisions and risks of alcohol, tobacco and illegal drug use. Parents were also involved in parents' evenings and watching children's performances. The research consisted of both process evaluation, consultation with pupils, teachers, parents, actors and health promotion staff on the project itself, and impact evaluation which looked at potential changes in children's knowledge, attitudes and decision-making skills. This paper reports findings of the impact evaluation, from six of the schools participating in the project. The impact evaluation consisted of pre- and post-project testing using a 'draw and write' and a problem-solving exercise. These findings suggest that the project had a significant impact on the children's knowledge of names of specific illegal drugs, and on their awareness that alcohol and cigarettes were also drugs, and secondly encouraged the children to think in less stereotypical terms about drugs and drug users. The problem-solving exercise, involving decision-making scenarios, showed small but positive trends between pre- and post-project solutions in more than half of the response categories. Methodological difficulties relating to evaluating such a project are discussed.

  4. Evaluation in Cross-Cultural Contexts: Proposing a Framework for International Education and Training Project Evaluations.

    ERIC Educational Resources Information Center

    bin Yahya, Ismail; And Others

    This paper focuses on the need for increased sensitivity and responsiveness in international education and training project evaluations, particularly those in Third World countries. A conceptual-theoretical framework for designing and developing models appropriate for evaluating education and training projects in non-Western cultures is presented.…

  5. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    ERIC Educational Resources Information Center

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  6. Evaluation of Title IV-C ESEA Projects, 1977-1978. Annual Report. Report #7909.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    Reports of fourteen program descriptions and evaluations are presented. All but two were produced by the Department of Federal Evaluation Resource Services, a model state evaluation project. The projects varied in purpose; budget; grades served; and number of students, teachers, and administrators participating. Reports vary in detail from one to…

  7. Evaluation of 1983 selective speed enforcement projects in Virginia.

    DOT National Transportation Integrated Search

    1985-01-01

    This report describes and evaluates Virginia's 1983 selective speed enforcement projects. These projects are one of the various types of highway safety programs, classified as selective traffic enforcement projects (STEPs) partially funded by the fed...

  8. Preview: Evaluation of the 1973-1974 Bilingual/Bicultural Project. Formative Evaluation Report.

    ERIC Educational Resources Information Center

    Ligon, Glynn; And Others

    The formative report provided the Austin Independent School District personnel with information useful for planning the remaining activities for the 1973-74 Bilingual/Bicultural Project and the activities for the 1974-75 Project. Emphasis was on what had been done to evaluate the 1973-74 Project, the data which was or would be available for the…

  9. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    ERIC Educational Resources Information Center

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  10. REMEDIATION TECHNOLOGY EVALUATION AT THE GILT EDGE MINE, SOUTH DAKOTA

    EPA Science Inventory

    This document reports the findings of the Mine Waste Technology Program's Activity III, Project 29,The Remediation Technology Evaluation Project at the Gilt Edge Mine, S.D. This project consisted of evaluating three emerging acidic waste rock stabilization technologies and compar...

  11. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUECK, K.J.

    2004-10-18

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less

  12. Evaluation of the Impact of the Elementary and Secondary Education Act in the Cincinnati Public Schools.

    ERIC Educational Resources Information Center

    Jacobs, James N., Ed.; Felix, Joseph L., Ed.

    1966-01-01

    This evaluation of Cincinnati's Title I projects for the disadvantaged public school students notes that definitive statements about measurable results are unrealistic because the projects were evaluated after only 5 months in operation. However the evaluation establishes baseline data. Information about the 13 Title I projects was gathered from…

  13. 34 CFR 646.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan for the project on the basis of the extent to which— (1) The applicant's methods for evaluation... changes based upon the results of project evaluation. (Approved by the Office of Management and Budget... grant: (a) Need for the project (24 points). The Secretary evaluates the need for a Student Support...

  14. An Analysis of Internally Funded Learning and Teaching Project Evaluation in Higher Education

    ERIC Educational Resources Information Center

    Huber, Elaine; Harvey, Marina

    2016-01-01

    Purpose: In the higher education sector, the evaluation of learning and teaching projects is assuming a role as a quality and accountability indicator. The purpose of this paper is to investigate how learning and teaching project evaluation is approached and critiques alignment between evaluation theory and practice. Design/Methodology/Approach:…

  15. Evaluating success levels of mega-projects

    NASA Technical Reports Server (NTRS)

    Kumaraswamy, Mohan M.

    1994-01-01

    Today's mega-projects transcend the traditional trajectories traced within national and technological limitations. Powers unleashed by internationalization of initiatives, in for example space exploration and environmental protection, are arguably only temporarily suppressed by narrower national, economic, and professional disagreements as to how best they should be harnessed. While the world gets its act together there is time to develop the technologies of such supra-mega-project management that will synergize truly diverse resources and smoothly mesh their interfaces. Such mega-projects and their management need to be realistically evaluated, when implementing such improvements. This paper examines current approaches to evaluating mega-projects and questions the validity of extrapolations to the supra-mega-projects of the future. Alternatives to improve such evaluations are proposed and described.

  16. Evaluating success criteria and project monitoring in river enhancement within an adaptive management framework

    USGS Publications Warehouse

    O'Donnell, T. K.; Galat, D.L.

    2008-01-01

    Objective setting, performance measures, and accountability are important components of an adaptive-management approach to river-enhancement programs. Few lessons learned by river-enhancement practitioners in the United States have been documented and disseminated relative to the number of projects implemented. We conducted scripted telephone surveys with river-enhancement project managers and practitioners within the Upper Mississippi River Basin (UMRB) to determine the extent of setting project success criteria, monitoring, evaluation of monitoring data, and data dissemination. Investigation of these elements enabled a determination of those that inhibited adaptive management. Seventy river enhancement projects were surveyed. Only 34% of projects surveyed incorporated a quantified measure of project success. Managers most often relied on geophysical attributes of rivers when setting project success criteria, followed by biological communities. Ninety-one percent of projects that performed monitoring included biologic variables, but the lack of data collection before and after project completion and lack of field-based reference or control sites will make future assessments of ecologic success difficult. Twenty percent of projects that performed monitoring evaluated ???1 variable but did not disseminate their evaluations outside their organization. Results suggest greater incentives may be required to advance the science of river enhancement. Future river-enhancement programs within the UMRB and elsewhere can increase knowledge gained from individual projects by offering better guidance on setting success criteria before project initiation and evaluation through established monitoring protocols. ?? 2007 Springer Science+Business Media, LLC.

  17. Economic evaluation of environmental epidemiological projects in national industrial complexes.

    PubMed

    Shin, Youngchul

    2017-01-01

    In this economic evaluation of environmental epidemiological monitoring projects, we analyzed the economic feasibility of these projects by determining the social cost and benefit of these projects and conducting a cost/benefit analysis. Here, the social cost was evaluated by converting annual budgets for these research and survey projects into present values. Meanwhile, the societal benefit of these projects was evaluated by using the contingent valuation method to estimate the willingness-to-pay of residents living in or near industrial complexes. In addition, the extent to which these projects reduced negative health effects (i.e., excess disease and premature death) was evaluated through expert surveys, and the analysis was conducted to reflect the unit of economic value, based on the cost of illness and benefit transfer method. The results were then used to calculate the benefit of these projects in terms of the decrease in negative health effects. For residents living near industrial complexes, the benefit/cost ratio was 1.44 in the analysis based on resident surveys and 5.17 in the analysis based on expert surveys. Thus, whichever method was used for the economic analysis, the economic feasibility of these projects was confirmed.

  18. The DLESE Evaluation Toolkit Project

    NASA Astrophysics Data System (ADS)

    Buhr, S. M.; Barker, L. J.; Marlino, M.

    2002-12-01

    The Evaluation Toolkit and Community project is a new Digital Library for Earth System Education (DLESE) collection designed to raise awareness of project evaluation within the geoscience education community, and to enable principal investigators, teachers, and evaluators to implement project evaluation more readily. This new resource is grounded in the needs of geoscience educators, and will provide a virtual home for a geoscience education evaluation community. The goals of the project are to 1) provide a robust collection of evaluation resources useful for Earth systems educators, 2) establish a forum and community for evaluation dialogue within DLESE, and 3) disseminate the resources through the DLESE infrastructure and through professional society workshops and proceedings. Collaboration and expertise in education, geoscience and evaluation are necessary if we are to conduct the best possible geoscience education. The Toolkit allows users to engage in evaluation at whichever level best suits their needs, get more evaluation professional development if desired, and access the expertise of other segments of the community. To date, a test web site has been built and populated, initial community feedback from the DLESE and broader community is being garnered, and we have begun to heighten awareness of geoscience education evaluation within our community. The web site contains features that allow users to access professional development about evaluation, search and find evaluation resources, submit resources, find or offer evaluation services, sign up for upcoming workshops, take the user survey, and submit calendar items. The evaluation resource matrix currently contains resources that have met our initial review. The resources are currently organized by type; they will become searchable on multiple dimensions of project type, audience, objectives and evaluation resource type as efforts to develop a collection-specific search engine mature. The peer review criteria and process for ensuring that the site contains robust and useful resources has been drafted and received initial feedback from the project advisory board, which consists of members of every segment of the target audience. The review criteria are based upon DLESE peer review criteria, the MERLOT digital library peer review criteria, digital resource evaluation criteria, and evaluation best practices. In geoscience education, as in most endeavors, improvements are made by asking questions and acting upon information about successes and failures; project evaluation can be thought of as the systematic process of asking these questions and gathering the right information. The Evaluation Toolkit seeks to help principal investigators, teachers, and evaluators use the evaluation process to improve our projects and our field.

  19. Performance Evaluation and Analysis of Rural Drinking Water Safety Project——A Case Study in Jiangsu, China

    NASA Astrophysics Data System (ADS)

    Du, Xiaorong

    2017-04-01

    Water is the basic condition for human survival and development. As China is the most populous country, rural drinking water safety problems are most conspicuous. Therefore, the Chinese government keeps increasing investment and has built a large number of rural drinking water safety projects. Scientific evaluation of project performance is of great significance to promote the sustainable operation of the project and the sustainable development of rural economy. Previous studies mainly focus on the economic benefits of the project, while ignoring the fact that the rural drinking water safety project is quasi-public goods, which has economic, social and ecological benefits. This paper establishes a comprehensive evaluation model for rural drinking water safety performance, which adapts the rules of "5E" (economy, efficiency, effectiveness, equity and environment) as the value orientation, and selects a rural drinking water safety project as object in case study at K District, which is in the north of Jiangsu Province, China. The results shows: 1) the comprehensive performance of K project is in good condition; 2) The performance of every part shows that the scores of criteria "efficiency", "environment" and "effect" are higher than the mean performance, while the "economy" is slightly lower than the mean and the "equity" is the lowest. 3) The performance of indicator layer shows that: the planned completion rate of project, the reduction rate of project cost and the penetration rate of water-use population are significantly lower than other indicators. Based on the achievements of previous studies and the characteristics of rural drinking water safety project, this study integrates the evaluation dimensions of equity and environment, which can contribute to a more comprehensive and systematic assessment of project performance and provide empirical data for performance evaluation and management of rural drinking water safety project. Key Words: Rural drinking water safety project; Performance evaluation; 5E rules; Comprehensive evaluation model

  20. The Queensland experience of participation in a national drug use evaluation project, Community-acquired pneumonia – towards improving outcomes nationally (CAPTION)

    PubMed Central

    Pulver, Lisa K; Tett, Susan E; Coombes, Judith

    2009-01-01

    Background Multicentre drug use evaluations are described in the literature infrequently and usually publish only the results. The purpose of this paper is to describe the experience of Queensland hospitals participating in the Community-Acquired Pneumonia Towards Improving Outcomes Nationally (CAPTION) project, specifically evaluating the implementation of this project, detailing benefits and drawbacks of involvement in a national drug use evaluation program. Methods Emergency departments from nine hospitals in Queensland, Australia, participated in CAPTION, a national quality improvement project, conducted in 37 Australian hospitals. CAPTION was aimed at optimising prescribing in the management of Community-Acquired Pneumonia according to the recommendations of the Australian Therapeutic Guidelines: Antibiotic 12th edition. The project involved data collection, and evaluation, feedback of results and a suite of targeted educational interventions including audit and feedback, group presentations and academic detailing. A baseline audit and two drug use evaluation cycles were conducted during the 2-year project. The implementation of the project was evaluated using feedback forms after each phase of the project (audit or intervention). At completion a group meeting with the hospital coordinators identified positive and negative elements of the project. Results Evaluation by hospitals of their participation in CAPTION demonstrated both benefits and drawbacks. The benefits were grouped into the impact on the hospital dynamic such as; improved interdisciplinary working relationships (e.g. between pharmacist and doctor), recognition of the educational/academic role of the pharmacist, creation of ED Pharmacist positions and enhanced involvement with the National Prescribing Service, and personal benefits. Personal benefits included academic detailing training for participants, improved communication skills and opportunities to present at conferences. The principal drawback of participation was the extra burden on already busy staff members. Conclusion A national multicentre drug use evaluation project such as CAPTION allows hospitals which would otherwise not undertake such projects the opportunity to participate. The Queensland arm of CAPTION demonstrated benefits to both the individual participants and their hospitals, highlighting the additional value of participating in a multicentre project of this type. PMID:19646287

  1. 7 CFR 654.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... period for which project or measure benefits and costs have been evaluated. The evaluated life starts after the last project measure of the evaluation unit has been completed. Landuser. Those who... purpose and the replacement of portions of project measures as specified in the O&M agreement. Operation...

  2. Impact evaluation of lighting retrofit projects at Boeing Commercial Airplane Group under The Energy $avings Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, G.P.; Oens, M.A.; Spanner, G.E.

    1994-01-01

    This impact evaluation of two lighting retrofit projects that were recently installed at Boeing Commercial Airplane Group (Boeing) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The first project was a light-fixture and lighting control retrofit, consisting of five individual measures installed in Building 40-05. The second project was a retrofit of all parking lot lighting on the site. The objective of this impact evaluation was to assess how much electrical energy is being saved at Boeing as a result of the E$P projects and to determine howmore » much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Boeing`s proposals and completion reports).« less

  3. The performance evaluation model of mining project founded on the weight optimization entropy value method

    NASA Astrophysics Data System (ADS)

    Mao, Chao; Chen, Shou

    2017-01-01

    According to the traditional entropy value method still have low evaluation accuracy when evaluating the performance of mining projects, a performance evaluation model of mineral project founded on improved entropy is proposed. First establish a new weight assignment model founded on compatible matrix analysis of analytic hierarchy process (AHP) and entropy value method, when the compatibility matrix analysis to achieve consistency requirements, if it has differences between subjective weights and objective weights, moderately adjust both proportions, then on this basis, the fuzzy evaluation matrix for performance evaluation. The simulation experiments show that, compared with traditional entropy and compatible matrix analysis method, the proposed performance evaluation model of mining project based on improved entropy value method has higher accuracy assessment.

  4. Refinement and Field Test of Evaluation Procedures and Materials for ESEA, Title VII Bilingual Education Projects. Phase III Report.

    ERIC Educational Resources Information Center

    Lam, Tony C. N.; And Others

    This report describes an extensive field test of the Bilingual Education Evaluation System (BEES) used to evaluate local level bilingual education projects. Because such projects will usually not be able to implement a traditional true or quasi-experimental design, BEES employs a "gap-reduction" evaluation design that is easily…

  5. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  6. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    NASA Astrophysics Data System (ADS)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  7. Augmented Fish Health Monitoring; Volume I of II, Completion Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michak, Patty

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fishmore » health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs.« less

  8. Go / NGO success ensures Vietnam project.

    PubMed

    2000-02-01

    This article reports the results of a joint evaluation by the Japanese Evaluation Team and the People's Committee of Nghe An on the Japan International Cooperation Agency Vietnam Reproductive Health (RH) Project. The evaluation, which was conducted through a workshop, showed that the Vietnam RH Project in Nghe An Province was successful. With two short-term experts dispatched to Vietnam in November and December 1999, the Project¿s activities were realized. Many activities were undertaken, which included retraining of community health centers, improvement of district health centers¿ monitoring capacity, and prenatal examination. Although the evaluation was carried out after only 2 years of actual activities, the Project¿s planned activities showed a smooth implementation as a result of good collaboration among Japan, the Vietnamese government, and nongovernmental organizations. With the successful outcome of the first phase of the project, both Japan and Vietnam have put up plans for future project activities.

  9. Development and Validation of a Project Package for Junior Secondary School Basic Science

    ERIC Educational Resources Information Center

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  10. Harvard Project Physics Research and Evaluation Bibliography.

    ERIC Educational Resources Information Center

    Welch, Wayne W.

    The articles listed were written as part of the research and evaluation program of Project Physics. Many articles are concerned with problems of educational research while others are devoted directly to the evaluation of Project Physics. The articles are listed in four categories according to the availability of reprints: (1) published articles…

  11. Project Change Evaluation Research Brief.

    ERIC Educational Resources Information Center

    Leiderman, Sally A.; Dupree, David M.

    Project Change is a community-driven anti-racism initiative operating in four communities: Albuquerque, New Mexico; El Paso, Texas; Knoxville, Tennessee; and Valdosta, Georgia. The formative evaluation of Project Change began in 1994 when all of the sites were still in planning or early action phases. Findings from the summative evaluation will be…

  12. Team Projects and Peer Evaluations

    ERIC Educational Resources Information Center

    Doyle, John Kevin; Meeker, Ralph D.

    2008-01-01

    The authors assign semester- or quarter-long team-based projects in several Computer Science and Finance courses. This paper reports on our experience in designing, managing, and evaluating such projects. In particular, we discuss the effects of team size and of various peer evaluation schemes on team performance and student learning. We report…

  13. Project SEARCH UK--Evaluating Its Employment Outcomes

    ERIC Educational Resources Information Center

    Kaehne, Axel

    2016-01-01

    Background: The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. Methods: The…

  14. School Safety Project: Product Evaluation, 1990-1991.

    ERIC Educational Resources Information Center

    Saginaw Public Schools, MI. Dept. of Evaluation Services.

    A districtwide school safety project implemented in Saginaw, Michigan, in 1990-91, the third year of its operation, is evaluated in this report. The project is evaluated on the basis of the following objectives: employment and training of home-school liaison officers; establishment of an advisory council; development and implementation of…

  15. Research on Comprehensive Evaluation Method for Heating Project Based on Analytic Hierarchy Processing

    NASA Astrophysics Data System (ADS)

    Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei

    2018-01-01

    It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.

  16. A systematic review of studies evaluating Australian indigenous community development projects: the extent of community participation, their methodological quality and their outcomes.

    PubMed

    Snijder, Mieke; Shakeshaft, Anthony; Wagemakers, Annemarie; Stephens, Anne; Calabria, Bianca

    2015-11-21

    Community development is a health promotion approach identified as having great potential to improve Indigenous health, because of its potential for extensive community participation. There has been no systematic examination of the extent of community participation in community development projects and little analysis of their effectiveness. This systematic review aims to identify the extent of community participation in community development projects implemented in Australian Indigenous communities, critically appraise the qualitative and quantitative methods used in their evaluation, and summarise their outcomes. Ten electronic peer-reviewed databases and two electronic grey literature databases were searched for relevant studies published between 1990 and 2015. The level of community participation and the methodological quality of the qualitative and quantitative components of the studies were assessed against standardised criteria. Thirty one evaluation studies of community development projects were identified. Community participation varied between different phases of project development, generally high during project implementation, but low during the evaluation phase. For the majority of studies, methodological quality was low and the methods were poorly described. Although positive qualitative or quantitative outcomes were reported in all studies, only two studies reported statistically significant outcomes. Partnerships between researchers, community members and service providers have great potential to improve methodological quality and community participation when research skills and community knowledge are integrated to design, implement and evaluate community development projects. The methodological quality of studies evaluating Australian Indigenous community development projects is currently too weak to confidently determine the cost-effectiveness of community development projects in improving the health and wellbeing of Indigenous Australians. Higher quality studies evaluating community development projects would strengthen the evidence base.

  17. Application fuzzy multi-attribute decision analysis method to prioritize project success criteria

    NASA Astrophysics Data System (ADS)

    Phong, Nguyen Thanh; Quyen, Nguyen Le Hoang Thuy To

    2017-11-01

    Project success is a foundation for project owner to manage and control not only for the current project but also for future potential projects in construction companies. However, identifying the key success criteria for evaluating a particular project in real practice is a challenging task. Normally, it depends on a lot of factors, such as the expectation of the project owner and stakeholders, triple constraints of the project (cost, time, quality), and company's mission, vision, and objectives. Traditional decision-making methods for measuring the project success are usually based on subjective opinions of panel experts, resulting in irrational and inappropriate decisions. Therefore, this paper introduces a multi-attribute decision analysis method (MADAM) for weighting project success criteria by using fuzzy Analytical Hierarchy Process approach. It is found that this method is useful when dealing with imprecise and uncertain human judgments in evaluating project success criteria. Moreover, this research also suggests that although cost, time, and quality are three project success criteria projects, the satisfaction of project owner and acceptance of project stakeholders with the completed project criteria is the most important criteria for project success evaluation in Vietnam.

  18. Methodology for evaluation of railroad technology research projects

    DOT National Transportation Integrated Search

    1981-04-01

    This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...

  19. Beyond Portfolios: A Practical Look at Student Projects as Teaching and Evaluation Devices (Part 2).

    ERIC Educational Resources Information Center

    Tillyer, Anthea; Sokolik, Maggi

    1993-01-01

    Steps required for developing a successful project class are described, beginning with an examination of how to use student writing projects with lower proficiency learners. A discussion of how projects can best be used as teaching and evaluation instruments in higher level classes is followed by examples of specific projects and styles. (Contains…

  20. Evaluation through Follow-Up of Students (UGU). Project No. 2119. Current Project 1983:4.

    ERIC Educational Resources Information Center

    Ljung, Bengt-Olov; Emanuelsson, Ingemar

    1983-01-01

    This newsletter describes a research design enabling descriptive, comparative, evaluative follow-up studies of individual development in social contexts related to schooling. In addition, it describes a research project focusing mainly on evaluative studies of the ability of the educational system to confer, on different individuals in various…

  1. Teaching Note--Keeping It Real: Program Evaluation Projects for an Undergraduate Research Class

    ERIC Educational Resources Information Center

    John, Aesha; Bang, Eun-Jun

    2017-01-01

    This article describes a teaching innovation that focused on the redesign of an undergraduate social work research class. Students enrolled in the redesigned class had an opportunity to conduct program evaluation projects in community agencies. The projects included (a) pretest and posttest evaluation of reminiscence approach in improving the…

  2. The National Evaluation of Project Follow Through: 1967-1968.

    ERIC Educational Resources Information Center

    Kurfeerst, Marvin; Stephens, Thomas M.

    Twenty-nine projects evaluated during the 1967-68 school year in the national evaluation of Project Follow Through are discussed in this final report. The report provides, in a narrative format, only the "hard" data gathered during the pre-test period. Specifically, this report reviews relevant literature, describes the procedures and…

  3. 34 CFR 425.30 - What are the evaluation requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... adequate measures to evaluate the effectiveness of the curriculum approaches supported by the project. (d... product spread and transportability. (e) A proposed project evaluation design must be submitted to the Secretary for review and approval prior to the end of the first year of the project period. (f) A summary of...

  4. Shared Features of High-Performing After-School Programs: A Follow-Up to the TASC Evaluation

    ERIC Educational Resources Information Center

    Birmingham, Jennifer; Pechman, Ellen M.; Russell, Christina A.; Mielke, Monica

    2005-01-01

    This study examined high-performing after-school projects funded by The After-School Corporation (TASC), to determine what characteristics, if any, these projects shared. Evaluators reanalyzed student performance data collected during the multi-year evaluation of the TASC initiative to identify projects where the after-school program was…

  5. Project CAREER/CAN. Final Evaluation Report.

    ERIC Educational Resources Information Center

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  6. 78 FR 29338 - Applications for New Award; Technical Assistance To Improve State Data Capacity-National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... formative and summative evaluations of the project; Note: The following Web site provides more information... plan, linked to the project's logic model, for a formative evaluation of the project's activities. The plan must describe how the formative evaluation will use clear performance objectives to ensure...

  7. Kentucky Migrant Technology Project: External Evaluation Report, 1997-98.

    ERIC Educational Resources Information Center

    Popp, Robert J.

    During its first year of operation (1997-98), the Kentucky Migrant Technology Project successfully implemented its model, used internal and external evaluations to inform improvement of the model, and began plans for expansion into new service areas. This evaluation report is organized around five questions that focus on the project model and its…

  8. The Program Evaluator's Role in Cross-Project Pollination.

    ERIC Educational Resources Information Center

    Yasgur, Bruce J.

    An expanded duties role of the multiple-program evaluator as an integral part of the ongoing decision-making process in all projects served is defended. Assumptions discussed included that need for projects with related objectives to pool resources and avoid duplication of effort and the evaluator's unique ability to provide an objective…

  9. High Impact Anti-Crime Program: A Framework for Assessing Project-Level Evaluation Plans.

    ERIC Educational Resources Information Center

    Kupersmith, Gerrie

    The pamphlet describes an evaluation model for crime reduction projects developed by National Institute of Law Enforcement and Criminal Justice sponsored research. It is meant to assist justice agency and project managers in determining completeness of evaluation planning by providing a framework against which to measure their evaluation…

  10. An Evaluation of the Agriculture Science Project in Mauritius. African Studies in Curriculum Development & Evaluation No. 102.

    ERIC Educational Resources Information Center

    Jeeroburkhan, M. Fazal

    This study evaluated the Agricultural Curriculum Project which is being implemented in 16 secondary schools in Mauritius. Specific areas examined included: (1) the relevance, appropriateness, and practicability of the project's general objectives; (2) the relevance, balance, and organization of the course content; (3) the effectiveness and…

  11. National evaluation of the FY 2003 Earmarked ITS Integration Project : Southern Wyoming, I-80 dynamic message signs, final phase III evaluation report.

    DOT National Transportation Integrated Search

    2010-12-01

    This report presents the results for the national evaluation of the FY 2003 Earmarked ITS Integration Project: Southern Wyoming, I-80 Dynamic Message Signs. The I-80 Dynamic Message Signs project is a rural infrastructure deployment of ITS devices th...

  12. Extensive Evaluation of Using a Game Project in a Software Architecture Course

    ERIC Educational Resources Information Center

    Wang, Alf Inge

    2011-01-01

    This article describes an extensive evaluation of introducing a game project to a software architecture course. In this project, university students have to construct and design a type of software architecture, evaluate the architecture, implement an application based on the architecture, and test this implementation. In previous years, the domain…

  13. NASA PC software evaluation project

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Kuan, Julie C.

    1986-01-01

    The USL NASA PC software evaluation project is intended to provide a structured framework for facilitating the development of quality NASA PC software products. The project will assist NASA PC development staff to understand the characteristics and functions of NASA PC software products. Based on the results of the project teams' evaluations and recommendations, users can judge the reliability, usability, acceptability, maintainability and customizability of all the PC software products. The objective here is to provide initial, high-level specifications and guidelines for NASA PC software evaluation. The primary tasks to be addressed in this project are as follows: to gain a strong understanding of what software evaluation entails and how to organize a structured software evaluation process; to define a structured methodology for conducting the software evaluation process; to develop a set of PC software evaluation criteria and evaluation rating scales; and to conduct PC software evaluations in accordance with the identified methodology. Communication Packages, Network System Software, Graphics Support Software, Environment Management Software, General Utilities. This report represents one of the 72 attachment reports to the University of Southwestern Louisiana's Final Report on NASA Grant NGT-19-010-900. Accordingly, appropriate care should be taken in using this report out of context of the full Final Report.

  14. Introduction to the Special Collection of Papers on the San Luis Basin Sustainability Metrics Project: A Methodology for Evaluating Regional Sustainability

    EPA Science Inventory

    This paper introduces a collection of four articles describing the San Luis Basin Sustainability Metrics Project. The Project developed a methodology for evaluating regional sustainability. This introduction provides the necessary background information for the project, descripti...

  15. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    USDA-ARS?s Scientific Manuscript database

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  16. Project P.A.V.E. Evaluation. Technical Report 1977-78. Publication Number: 77.49.

    ERIC Educational Resources Information Center

    Eglsaer, Richard; Matuszek, Paula

    Project PAVE was implemented in Travis High School, Austin, Texas, to extend and coordinate services for certain high school special education students. Four components were crucial to the Project PAVE model: parental involvement, academic achievement, vocational programing, and extracurricular opportunities. The project evaluation, conducted in…

  17. EPA Critical Path Science Plan Projects 19, 20 and 21: Human and Bovine Source Detection

    EPA Science Inventory

    The U.S. EPA Critical Path Science Plan Projects are: Project 19: develop novel bovine and human host-specific PCR assays and complete performance evaluation with other published methods. Project 20: Evaluate human-specific assays with water samples impacted with different lev...

  18. An Evaluation of the Community Education Demonstration Projects.

    ERIC Educational Resources Information Center

    Wynne, Ronald D.

    The report summarizes a six-month evaluation (July-December 1967) of 11 community education projects funded by the Office of Economic Opportunity. Major focus is on eight projects which comprised a special series of Section 207 Community Education Demonstration Projects--Appalachian Volunteers, Inc., the Columbia College Citizenship Council…

  19. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  20. Evaluation of construction strategies for PCC pavement rehabilitation projects.

    DOT National Transportation Integrated Search

    2010-09-30

    This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...

  1. Designs for Evaluating the Community-Level Impact of Comprehensive Prevention Programs: Examples from the CDC Centers of Excellence in Youth Violence Prevention.

    PubMed

    Farrell, Albert D; Henry, David; Bradshaw, Catherine; Reischl, Thomas

    2016-04-01

    This article discusses the opportunities and challenges of developing research designs to evaluate the impact of community-level prevention efforts. To illustrate examples of evaluation designs, we describe six projects funded by the Centers for Disease Control and Prevention to evaluate multifaceted approaches to reduce youth violence in high-risk communities. Each of these projects was designed to evaluate the community-level impact of multiple intervention strategies to address individual and contextual factors that place youth at risk for violent behavior. Communities differed across projects in their setting, size, and how their boundaries were defined. Each project is using multiple approaches to compare outcomes in one or more intervention communities to those in comparison communities. Five of the projects are using comparative interrupted time-series designs to compare outcomes in an intervention community to matched comparison communities. A sixth project is using a multiple baseline design in which the order and timing of intervention activities is randomized across three communities. All six projects are also using regression point displacement designs to compare outcomes within intervention communities to those within broader sets of similar communities. Projects are using a variety of approaches to assess outcomes including archival records, surveys, and direct observations. We discuss the strengths and weaknesses of the designs of these projects and illustrate the challenges of designing high-quality evaluations of comprehensive prevention approaches implemented at the community level.

  2. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    NASA Astrophysics Data System (ADS)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  3. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    NASA Astrophysics Data System (ADS)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  4. OERL: A Tool For Geoscience Education Evaluators

    NASA Astrophysics Data System (ADS)

    Zalles, D. R.

    2002-12-01

    The Online Evaluation Resource Library (OERL) is a Web-based set of resources for improving the evaluation of projects funded by the Directorate for Education and Human Resources (EHR) of the National Science Foundation (NSF). OERL provides prospective project developers and evaluators with material that they can use to design, conduct, document, and review evaluations. OERL helps evaluators tackle the challenges of seeing if a project is meeting its implementation and outcome-related goals. Within OERL is a collection of exemplary plans, instruments, and reports from evaluations of EHR-funded projects in the geosciences and in other areas of science and mathematics. In addition, OERL contains criteria about good evaluation practices, professional development modules about evaluation design and questionnaire development, a dictionary of key evaluation terms, and links to evaluation standards. Scenarios illustrate how the resources can be used or adapted. Currently housed in OERL are 137 instruments, and full or excerpted versions of 38 plans and 60 reports. 143 science and math projects have contributed to the collection so far. OERL's search tool permits the launching of precise searches based on key attributes of resources such as their subject area and the name of the sponsoring university or research institute. OERL's goals are to 1) meet the needs for continuous professional development of evaluators and principal investigators, 2) complement traditional vehicles of learning about evaluation, 3) utilize the affordances of current technologies (e.g., Web-based digital libraries, relational databases, and electronic performance support systems) for improving evaluation practice, 4) provide anytime/anyplace access to update-able resources that support evaluators' needs, and 5) provide a forum by which professionals can interact on evaluation issues and practices. Geoscientists can search the collection of resources from geoscience education projects that have been funded by NSF to carry out curriculum development, teacher education, faculty development, and increased access, retention, and preparation of under-represented student populations in science. Over the next two years, additional plans, instruments, and reports from other projects will be added to the OERL collection. Also to be added are more professional development modules and online coaches for constructing key evaluation documents. The presentation overviews the structure of OERL, describes some of the geoscience projects in the collection, and provides some examples of how its resources can be used and adapted for other geoscience education evaluations.

  5. TTI CM/AQ evaluation model user`s guide and workshop training materials. Interim research report, September 1993-August 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The TTI CM/AQ Evaluation Model evaluates potential projects based on the following criteria: eligibility, travel impacts, emission impacts, and cost-effectiveness. To compare independent projects within a region during the decision process for CM/AQ funding, each project evaluated with this model is given an overall score based on the project`s effects for the criteria listed above. Training workshops were held by TTI in the first quarter of 1995 to teach metropolitan planning organization, state department of transportation, and regional air quality organization staff how to use this model. Basics of sketch-planning applications were also taught. The DRCOG and TTI CM/AQ Evaluationmore » Models represent significant steps toward the development of analytical methodologies for selecting projects for CM/AQ funding. Because the needs of nonattainment and attainment areas change over time, this model is particularly useful as key evaluation criteria can be modified to reflect the changing needs of a metropolitan area.« less

  6. Evaluation framework for 16 earmarked projects in Washington State

    DOT National Transportation Integrated Search

    2007-05-01

    This report documents the results of applying a previously developed, standardized approach for evaluating advanced traveler information systems (ATIS) projects to a much more diverse group of 16 intelligent transportation systems (ITS) projects. The...

  7. Evaluating Performance of Highway Safety Projects

    DOT National Transportation Integrated Search

    2016-12-01

    The purpose of this project was to investigate and document methods that the Idaho Transportation Department (ITD) and Local Highway Technical Assistance Council (LHTAC) can use to evaluate the performance of safety projects that have been implemente...

  8. Field evaluation of roller integrated intelligent compaction monitoring

    DOT National Transportation Integrated Search

    2016-05-01

    DOTD conducted a demonstration : project to evaluate intelligent compaction (IC). The : project developed specifications, which allo : wed and incorporated : the IC rollers on the : project. The specification went through th : e competitive bidding p...

  9. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  10. ANNUAL EVALUATION REPORT OF CONNECTICUT TITLE I PROJECTS FOR FISCAL YEAR 1966.

    ERIC Educational Resources Information Center

    ROBY, WALLACE

    THIS EVALUATION BY THE CONNECTICUT DEPARTMENT OF EDUCATION OF THE ELEMENTARY AND SECONDARY EDUCATION ACT TITLE I PROJECTS CAUTIONS ABOUT MAKING GENERALIZATIONS ABOUT THE EFFECTIVENESS OF PROJECTS WHICH HAVE BEEN IN OPERATION FOR ONLY A BRIEF PERIOD. THE REPORT NOTES, HOWEVER, THAT SUCH AN EVALUATION CAN BE USEFUL IN ESTABLISHING BASELINE DATA AND…

  11. Guia para la Elaboracion y Evaluacion de Proyectos de Investigacion (Guidelines for Reporting and Evaluating Research Projects).

    ERIC Educational Resources Information Center

    Morles, Victor

    This article establishes guidelines for conducting and evaluating research projects according to a scientific methodology. The organizational format suggested here follows an outline with elements and details that should be considered in an investigation. Each part of the proposed outline is explained, and terms are defined. Project evaluation is…

  12. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  13. Learning Investment for Tomorrow: ESEA Title I Project 69-092, Evaluation Report, 1968-1969.

    ERIC Educational Resources Information Center

    Colorado Springs Public Schools, CO. Div. of Special Services.

    This evaluation report carries a description of each project then in operation, an analysis of the evaluative data collected for each, and recommendations for improvement. Objectives of the projects, geared for disadvantaged youth (K-12), were: improvement of performance of capabilities of children with learning disabilities due to psychological,…

  14. Workplace ESL Literacy in Diverse Small Business Contexts: Final Evaluation Report on Project EXCEL.

    ERIC Educational Resources Information Center

    Hemphill, David F.

    Project EXCEL, a workplace literacy project involving four small business enterprises in San Francisco, is evaluated. The project focused on literacy and basic skills training for limited-English-proficient (LEP) workers. The businesses included the following: a communications and mass mailing firm; a dessert wholesale company; a Mexican…

  15. Hawaii English Program: Project End Evaluation Report 1970-1971.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Education, Honolulu.

    This report is comprised of two reports: the Final Audit Report of the Hawaii English Project, submitted by the Northwest Regional Educational Laboratory, and the main report, the Hawaii English Program Project End Evaluation Report by the Hawaii English Project Staff. The Audit Report is limited to a review of data reduction, analysis, and…

  16. Formative Evaluation of a Nutritional Marketing Project in City-Center Restaurants.

    ERIC Educational Resources Information Center

    Demers, Andree; Renaud, Lise

    1992-01-01

    Formative evaluation of a community health project providing and promoting low-fat foods in five restaurants in Montreal (Canada) shows that restaurateurs are willing to collaborate in project implementation but not in training waiters and that the project did not cause an increase in market demand for low-fat menu offerings. (SLD)

  17. Evaluation of the Rural Math Excel Partnership Project Final Report

    ERIC Educational Resources Information Center

    Nagle, Katherine; Pratt-Williams, Jaunelle; Schmidt, Rebecca; Swantek, Cara; Lyulchenko, Marianna; McGhee, Raymond

    2016-01-01

    This is the final external evaluation report prepared by SRI International for the Rural Math Excel Partnership (RMEP) project, an investing in innovation (i3) development project funded by the U.S. Department of Education. Operated by Virginia Advanced Study Strategies, Inc. (VASS), the RMEP project included six rural school districts (LEAs) in…

  18. Small Business Learning through Mentoring: Evaluating a Project

    ERIC Educational Resources Information Center

    Barrett, Rowena

    2006-01-01

    Purpose: The purpose of this paper is to evaluate a small business-mentoring project, which was delivered in regional Australia. Design/methodology/approach: This paper contains a case study of the mentoring project and focuses on the process and the outcomes of that project from different perspectives. Data collected in semi structured telephone…

  19. Parent Leadership Training Project, October 1, 1970-September 30, 1972. Independent Evaluator's Report.

    ERIC Educational Resources Information Center

    Arter, Rhetta M.

    The Parent Leadership Training Project (PLTP) through Adult Basic Education was established as a two-year demonstration project designed to increase the reading skills of adults (16 and over) through a language-experience approach, using topics selected by the participants. The independent project evaluation covers the entire operational period…

  20. Outside Evaluation Report for the Arlington Federal Workplace Literacy Project.

    ERIC Educational Resources Information Center

    Wrigley, Heide Spruck

    The successes and challenges of the Arlington Education and Employment Program (REEP) Workplace Literacy Project in Virginia are described in this evaluation report. REEP's federal Workplace Literacy Project Consortium is operated as a special project within the Department of Adult, Career and Vocational Education of the Arlington Public Schools.…

  1. Flexibility for Vocational Education through Computer Scheduling. Quarterly Report.

    ERIC Educational Resources Information Center

    Allen, Dwight W.

    This progress report of a 2-year project (ending April 30, 1968) offers a random sampling of course schedule configurations and specific course performance criteria submitted to the Stanford project staff for evaluation and comment, and a brief statement of the project's data collection and data evaluation objectives. The project seeks to…

  2. The evaluator as technical assistant: A model for systemic reform support

    NASA Astrophysics Data System (ADS)

    Century, Jeanne Rose

    This study explored evaluation of systemic reform. Specifically, it focused on the evaluation of a systemic effort to improve K-8 science, mathematics and technology education. The evaluation was of particular interest because it used both technical assistance and evaluation strategies. Through studying the combination of these roles, this investigation set out to increase understanding of potentially new evaluator roles, distinguish important characteristics of the evaluator/project participant relationship, and identify how these roles and characteristics contribute to effective evaluation of systemic science education reform. This qualitative study used interview, document analysis, and participant observation as methods of data collection. Interviews were conducted with project leaders, project participants, and evaluators and focused on the evaluation strategies and process, the use of the evaluation, and technical assistance. Documents analyzed included transcripts of evaluation team meetings and reports, memoranda and other print materials generated by the project leaders and the evaluators. Data analysis consisted of analytic and interpretive procedures consistent with the qualitative data collected and entailed a combined process of coding transcripts of interviews and meetings, field notes, and other documents; analyzing and organizing findings; writing of reflective and analytic memos; and designing and diagramming conceptual relationships. The data analysis resulted in the development of the Multi-Function Model for Systemic Reform Support. This model organizes systemic reform support into three functions: evaluation, technical assistance, and a third, named here as "systemic perspective." These functions work together to support the project's educational goals as well as a larger goal--building capacity in project participants. This model can now serve as an informed starting point or "blueprint" for strategically supporting systemic reform.

  3. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470.317 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  4. Identifying impediments and solutions to sidewalk project implementation in Pennsylvania.

    DOT National Transportation Integrated Search

    2016-09-30

    The purpose of this research project was to evaluate the implementation issues of sidewalk projects that are funded through various federal programs administrated by the Pennsylvania Department of Transportation (PennDOT). This evaluation has identif...

  5. Teaching Breast and Testicular Self-Exams: Evaluation of a High School Curriculum Pilot Project.

    ERIC Educational Resources Information Center

    Luther, Stephen L.; And Others

    1985-01-01

    A high school curriculum project was developed to teach students about the importance of breast and testicular self-examination. Questionnaires were used to evaluate the project. Results are discussed. (DF)

  6. Chattanooga SmartBus Project : phase 2 evaluation report

    DOT National Transportation Integrated Search

    2008-06-10

    This report presents the results of Phase II of the national evaluation of the Chattanooga Area Regional Transportation Authoritys (CARTAs) SmartBus Project. The Smartbus Project is a comprehensive transit ITS program for the city of Chattanoog...

  7. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    PubMed

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Project SEARCH UK - Evaluating Its Employment Outcomes.

    PubMed

    Kaehne, Axel

    2016-11-01

    The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. The evaluation obtained data from all sites operational in the UK at the time of evaluation (n = 17) and analysed employment outcomes. Data were available for 315 young people (n = 315) in the programme and pay and other employment related data were available for a subsample. The results of the analysis suggest that Project SEARCH achieves on average employment rates of around 50 per cent. Project SEARCH UK represents a valuable addition to the supported employment provision in the UK. Its unique model should inform discussions around best practice in supported employment. Implications for other supported employment programmes are discussed. © 2015 John Wiley & Sons Ltd.

  9. WE-AB-207A-12: HLCC Based Quantitative Evaluation Method of Image Artifact in Dental CBCT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Y; Wu, S; Qi, H

    Purpose: Image artifacts are usually evaluated qualitatively via visual observation of the reconstructed images, which is susceptible to subjective factors due to the lack of an objective evaluation criterion. In this work, we propose a Helgason-Ludwig consistency condition (HLCC) based evaluation method to quantify the severity level of different image artifacts in dental CBCT. Methods: Our evaluation method consists of four step: 1) Acquire Cone beam CT(CBCT) projection; 2) Convert 3D CBCT projection to fan-beam projection by extracting its central plane projection; 3) Convert fan-beam projection to parallel-beam projection utilizing sinogram-based rebinning algorithm or detail-based rebinning algorithm; 4) Obtain HLCCmore » profile by integrating parallel-beam projection per view and calculate wave percentage and variance of the HLCC profile, which can be used to describe the severity level of image artifacts. Results: Several sets of dental CBCT projections containing only one type of artifact (i.e. geometry, scatter, beam hardening, lag and noise artifact), were simulated using gDRR, a GPU tool developed for efficient, accurate, and realistic simulation of CBCT Projections. These simulated CBCT projections were used to test our proposed method. HLCC profile wave percentage and variance induced by geometry distortion are about 3∼21 times and 16∼393 times as large as that of the artifact-free projection, respectively. The increase factor of wave percentage and variance are 6 and133 times for beam hardening, 19 and 1184 times for scatter, and 4 and16 times for lag artifacts, respectively. In contrast, for noisy projection the wave percentage, variance and inconsistency level are almost the same with those of the noise-free one. Conclusion: We have proposed a quantitative evaluation method of image artifact based on HLCC theory. According to our simulation results, the severity of different artifact types is found to be in a following order: Scatter>Geometry>Beam hardening>Lag>Noise>Artifact-free in dental CBCT.« less

  10. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    PubMed

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and experiential learning activities over passive teaching approaches such as powerpoints and videos.

  11. Using Evaluability Assessment to Improve Program Evaluation for the Blue-Throated Macaw Environmental Education Project in Bolivia

    ERIC Educational Resources Information Center

    Salvatierra da Silva, Daniela; Jacobson, Susan K.; Monroe, Martha C.; Israel, Glenn D.

    2016-01-01

    An evaluability assessment of a program to save a critically endangered bird helped prepare the Blue-throated Macaw Environmental Education Project for evaluation and program improvement. The evaluability assessment facilitated agreement among key stakeholders on evaluation criteria and intended uses of evaluation information in order to maximize…

  12. Examining of the Predictors of Pre-Service Teachers' Perceptions of the Quality of the Science Fair Projects in Turkey

    ERIC Educational Resources Information Center

    Tortop, Hasan Said

    2014-01-01

    This study aimed at examining the predictors of quality of science fair (SF) projects in the light of pre-service teachers' evaluation of SF rubric' domains. These projects were selected by judges in A city for the A Regional Exhibition of Science and Mathematics Project Study for Primary School Students: The SF projects were evaluated by thirty…

  13. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  14. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    PubMed

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  15. Science Base and Tools for Evaluating Stream Restoration Project Proposals.

    NASA Astrophysics Data System (ADS)

    Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.

    2008-12-01

    Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.

  16. Project monitoring and evaluation: an enhancing method for health research system management.

    PubMed

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  17. CSC Tip Sheets: Conducting and Evaluating Pilot Projects

    EPA Pesticide Factsheets

    Learn how to conduct and evaluate pilot projects, which are opportunities to “test the waters” for your project on a small scale, provide insight and data on what works, and adjust your strategy for full-scale implementation.

  18. Chattanooga SmartBus Project : phase III evaluation report

    DOT National Transportation Integrated Search

    2009-12-01

    This report presents the results of Phase III of the national evaluation of the Chattanooga Area Regional Transportation Authoritys (CARTA) SmartBus Project. The SmartBus Project is a comprehensive transit ITS program for the city of Chattanooga, ...

  19. Identifying impediments and solutions to sidewalk project implementation in Pennsylvania : final report.

    DOT National Transportation Integrated Search

    2016-09-30

    The purpose of this research project was to evaluate the implementation issues of sidewalk projects that are funded through various federal programs administrated by the Pennsylvania Department of Transportation (PennDOT). This evaluation has identif...

  20. Developing the protocol for the evaluation of the health foundation's 'engaging with quality initiative' – an emergent approach

    PubMed Central

    Soper, Bryony; Buxton, Martin; Hanney, Stephen; Oortwijn, Wija; Scoggins, Amanda; Steel, Nick; Ling, Tom

    2008-01-01

    In 2004 a UK charity, The Health Foundation, established the 'Engaging with Quality Initiative' to explore and evaluate the benefits of engaging clinicians in quality improvement in healthcare. Eight projects run by professional bodies or specialist societies were commissioned in various areas of acute care. A developmental approach to the initiative was adopted, accompanied by a two level evaluation: eight project self-evaluations and a related external evaluation. This paper describes how the protocol for the external evaluation was developed. The challenges faced included large variation between and within the projects (in approach, scope and context, and in understanding of quality improvement), the need to support the project teams in their self-evaluations while retaining a necessary objectivity, and the difficulty of evaluating the moving target created by the developmental approach adopted in the initiative. An initial period to develop the evaluation protocol proved invaluable in helping us to explore these issues. PMID:18973650

  1. UNAVCO's Education and Community Engagement Program: Evaluating Five years of Geoscience Education and Community Outreach

    NASA Astrophysics Data System (ADS)

    Charlevoix, D. J.; Dutilly, E.

    2017-12-01

    In 2013, UNAVCO, a facility co-sponsored by the NSF and NASA, received a five-year award from the NSF: Geodesy Advancing Geosciences and EarthScope (GAGE). Under GAGE, UNAVCO's Education and Community Engagement (ECE) program conducts outreach and education activities, in essence broader impacts for the scientific community and public. One major challenge of this evaluation was the breadth and depth of the dozens of projects conducted by the ECE program under the GAGE award. To efficiently solve this problem of a large-scale program evaluation, we adopted a deliberative democratic (DD) approach that afforded UNAVCO ECE staff a prominent voice in the process. The evaluator directed staff members to chose the projects they wished to highlight as case studies of their finest broader impacts work. The DD approach prizes inclusion, dialogue, and deliberation. The evaluator invited ECE staff to articulate qualities of great programs and develop a case study of their most valuable broader impacts work. To anchor the staff's opinion in more objectivity than opinion, the evaluator asked each staff member to articulate exemplary qualities of their chosen project, discuss how these qualities fit their case study, and helped staff to develop data collection systems that lead to an evidence-based argument in support of their project's unique value. The results of this evaluation show that the individual ECE work areas specialized in certain kinds of projects. However, when viewed at the aggregate level, ECE projects spanned almost the entire gamut of NSF broader impacts categories. Longitudinal analyses show that since the beginning of the GAGE award, many projects grew in impact from year 1 to year 5. While roughly half of the ECE projects were prior work projects, by year five at least 33% of projects were newly developed under GAGE. All selected case studies exemplified how education and outreach work can be productively tied to UNAVCO's core mission of promoting geodesy.

  2. Evaluation of the Guided Occupational Orientation-Training and Job Placement Project Syracuse City School District.

    ERIC Educational Resources Information Center

    Holder, Harold D.; And Others

    The report provides a summary of the independent, third party evaluation of the 1972-73 funding year of the Guided Occupational Orientation Project of the Syracuse City School District. A systems approach to evaluation was utilized in this effort. The funded project involved all three grade populations--elementary, junior high school, and senior…

  3. Annual Report. Technical Reports. Evaluation Productivity Project.

    ERIC Educational Resources Information Center

    Alkin, Marvin; And Others

    After outlining the 1984 activities and results of the Center for the Study of Evaluation's (CSE's) Evaluation Productivity Project, this monograph presents three reports. The first, "The Administrator's Role in Evaluation Use," by James Burry, Marvin C. Alkin, and Joan A. Ruskus, describes the factors influencing an evaluation's use…

  4. Comparison of Outcomes for Youth Apprenticeship Projects and Youth Career Development Projects. Supplementary Report.

    ERIC Educational Resources Information Center

    Richards, James M., Jr.; And Others

    The New Youth Initiatives in Apprenticeship Program (YAP) was compared with the Youth Career Development Program (YCD). Data for 1979 and 1980 came from an evaluation of YAP projects by CSR, Incorporated, and an evaluation of the YCD projects by the Educational Testing Service. A multiple regression approach was used to compare student…

  5. Project Plan: The MEDARP Documentation Unit to the School Improvement and Local School Development Projects.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    The Metropolitan Educational Development and Research Project (MEDARP) Documentation Unit, located in the Office of Educational Evaluation (OEE) at the New York City Board of Education, is funded by the Ford Foundation to document, evaluate and provide technical assistance to the School Improvement and Local School Development Projects; these are…

  6. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  7. Programme for Learning Enrichment. A Van Leer Project: An Evaluation.

    ERIC Educational Resources Information Center

    Ghani, Zainal

    This paper reports the evaluation of a project undertaken by the Sarawak Education Department to improve the quality of education in upper primary classes in rural Sarawak, Malaysia. The project is known officially as the Programme for Learning Enrichment, and commonly as the Van Leer Project, after the international agency which provides the main…

  8. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  9. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    ERIC Educational Resources Information Center

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  10. Handbook for Evaluating Ecological Effects of Pollution at DARCOM installations. Volume 4. Terrestrial Surveys

    DTIC Science & Technology

    1979-12-01

    AD RDTE Project No. ____________ TECOM Project No. O-CO-520-EOC-004 AYL) DPG Document No. DPG HB 80-804 0 HANDBOOK FOR EVALUATING ECOLOGICAL EFFECTS...NUMBER TECOM Project No. 0-C0-520-EQC-004’__ __" . .TITLEd . .5. TYPE OF REPORT PERIOD COVERED *! Handbook for Evaluating Ecological Effects of Pollution...IS. SUPPLEMENTARY NOTES Volume 4 of seven volumes dealing with evaluating ecological effects of pollution at DARCOM installations 19. KEY WORDS

  11. 34 CFR 425.30 - What are the evaluation requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... adequate measures to evaluate the effectiveness of the curriculum approaches supported by the project. (d... product spread and transportability. (e) A proposed project evaluation design must be submitted to the...

  12. ITS evaluation -- phase 3 (2010)

    DOT National Transportation Integrated Search

    2011-05-01

    This report documents the results of applying a previously developed, standardized approach for : evaluating intelligent transportation systems (ITS) projects to 17 ITS earmark projects. The evaluation : approach was based on a questionnaire to inves...

  13. Evaluation strategy : Puget Sound regional fare card : FY01 earmark evaluation

    DOT National Transportation Integrated Search

    2003-06-24

    King County Metro Transit is the lead agency responsible for implementing the Central Puget Sound Regional Fare Coordination Project (RFC Project). The project features a smart card technology that will support and link the fare collection systems of...

  14. Evaluation Guidelines for Service and Methods Demonstration Projects

    DOT National Transportation Integrated Search

    1976-02-01

    The document consists of evaluation guidelines for planning, implementing, and reporting the findings of the evaluation of Service and Methods Demonstration (SMD) projects sponsored by the Urban Mass Transportation Administration (UMTA). The objectiv...

  15. Tennessee long-range transportation plan : project evaluation system

    DOT National Transportation Integrated Search

    2005-12-01

    The Project Evaluation System (PES) Report is an analytical methodology to aid programming efforts and prioritize multimodal investments. The methodology consists of both quantitative and qualitative evaluation criteria built upon the Guiding Princip...

  16. Tensions and Trade-Offs in Voluntary Involvement: Evaluating the Collaboratives for Excellence in Teacher Preparation

    ERIC Educational Resources Information Center

    Greenseid, Lija O.; Lawrenz, Frances

    2011-01-01

    A team at the University of Minnesota conducted the Collaboratives for Excellence in Teacher Preparation (CETP) core evaluation between 1999 and 2004. The purpose of the CETP core evaluation was to achieve consensus among CETP project leaders and project evaluators on evaluation questions; to develop, pilot, and field test evaluation instruments…

  17. Control of Cattle Ticks and Tick-Borne Diseases by Acaricide in Southern Province of Zambia: A Retrospective Evaluation of Animal Health Measures According to Current One Health Concepts.

    PubMed

    Laing, Gabrielle; Aragrande, Maurizio; Canali, Massimo; Savic, Sara; De Meneghi, Daniele

    2018-01-01

    One health thinking for health interventions is increasingly being used to capture previously unseen stakeholders and impacts across people, animals, and the environment. The Network for One Health Evaluation (NEOH) proposes a systems-based framework to quantitatively assess integration and highlight the added value (theory of change) that this approach will bring to a project. This case study will retrospectively evaluate the pioneering use of a One Health (OH) approach during an international collaboration (satellite project to tackle production losses due to tick-borne disease in cattle in Southern Zambia in late 1980s). The objective of the evaluation is twofold: retrospective evaluation the OH-ness of the satellite project and identification of costs and benefits. Data for evaluation was recovered from publications, project documents, and witness interviews. A mixed qualitative and quantitative evaluation was undertaken. In this case study, a transdisciplinary approach allowed for the identification of a serious public health risk arising from the unexpected reuse of chemical containers by the local public against advice. Should this pioneering project not have been completed then it is assumed this behavior could have had a large impact on public wellbeing and ultimately reduced regional productivity and compromised welfare. From the economic evaluation, the costs of implementing this OH approach, helping to avoid harm, were small in comparison to overall project costs. The overall OH Index was 0.34. The satellite project demonstrated good OH operations by managing to incorporate the input across multiple dimensions but was slightly weaker on OH infrastructures (OH Ratio = 1.20). These quantitative results can be used in the initial validation and benchmarking of this novel framework. Limitations of the evaluation were mainly a lack of data due to the length of time since project completion and a lack of formal monitoring of program impact. In future health strategy development and execution, routine monitoring and evaluation from an OH perspective (by utilizing the framework proposed by NEOH), could prove valuable or used as a tool for retrospective evaluation of existing policies.

  18. The evaluation of OSTA's APT and ASVT programs

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The results of an evaluation of NASA's Applications Pilot Test (APT) and Applications System Verification and Transfer (AVST) Programs are presented. These programs sponsor cooperative projects between NASA and potential users of remote sensing (primarily LANDSAT) technology from federal and state government and the private sector. Fifteen specific projects, seven APT's and eight ASVT's, are examined as mechanisms for technology development, test, and transfer by comparing their results against stated objectives. Interviews with project managers from NASA field centers and user agency representatives provide the basis for project evaluation from NASA and user perspectives.

  19. A portfolio evaluation framework for air transportation improvement projects

    NASA Astrophysics Data System (ADS)

    Baik, Hyeoncheol

    This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in more fully evaluating the air transportation improvement projects.

  20. Evaluation of the Field Test of Project Information Packages: Volume III--Resource Cost Analysis.

    ERIC Educational Resources Information Center

    Al-Salam, Nabeel; And Others

    The third of three volumes evaluating the first year field test of the Project Information Packages (PIPs) provides a cost analysis study as a key element in the total evaluation. The resource approach to cost analysis is explained and the specific resource methodology used in the main cost analysis of the 19 PIP field-test projects detailed. The…

  1. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 1.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    The first of three parts of the Vocational Evaluation Project final report contains an editorial, two task force reports, and brief summaries of the seven task force reports which comprise the final report. The editorial summarizes the project's purpose, its activities for the three years of its existence, and its results, and describes the task…

  2. Title I ESEA Projects: Digest of Annual Evaluations. Supplementary Edition 1977-1978. A historical summary, by the Department of Federal Evaluation Resources, of the key findings reported in the annual evaluations of each project. Report #7827.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This supplement provides a historical summary, for the Philadelphia, Pennsylvania schools, of the key findings in the Annual Evaluations of each Elementary Secondary Education Act Title I project since 1975. The 1977-1978 management information, the key findings for 1975-1976 and 1976-1977, as well as the preliminary findings for 1977-1978 are…

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agol, Dorice, E-mail: d.agol@uea.a.c.uk; Latawiec, Agnieszka E., E-mail: a.latawiec@iis-rio.org; Opole University of Technology, Department of Production Engineering and Logistics, Luboszycka 5, 45-036 Opole

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In thismore » study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The knowledge derived from this study may therefore be useful to a wider range of audience who are concerned with sustainable integration of development and environmental conservation. - Highlights: • Sustainability indicators are increasingly used for evaluating project impacts. • Lessons learnt are based on case studies from Africa, Asia and South America. • Similar challenges when assessing impacts of development and conservation projects • Need for pragmatic solutions to overcome challenges when assessing project impacts.« less

  4. Performance of concrete joint sealants in hot climates

    DOT National Transportation Integrated Search

    1987-11-01

    A research project was initiated in 1979 on project IR-17-1(126) to compare and evaluate several joint sealants. In 1982 another test section on project F 028-1-506 was established to evaluate several other sealants. This report documents the placeme...

  5. Measuring the socio-economic impacts of agroforestry projects in the Philippines

    Treesearch

    Evan Mercer; Belita Vega; Hermie Francisco; Robin Maille

    1994-01-01

    Conventional wisdom suggests that agroforestry projects can provide both ecological and economic benefits. Most agroforestry project evaluations, however, have failed to adequately assess the soci0-economic impacts. For example, a review of 108 agroforestry project impact evaluations by Sara Scherr of IFPRJ reported that only 8% assessed economic costs or benefits, 5%...

  6. Bilingual Education Talented Academy: Gifted and Talented, Project BETA, 1988-89. Evaluation Section Report [and] Executive Summary. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Cantalupo, Denise

    This evaluation report describes the Bilingual Education Talented Academy--Gifted and Talented Project (Project BETA) in its first year of a 3-year Elementary and Secondary Education Act Title VII funding cycle. The project served 307 students of limited English proficiency in two Bronx (New York) high schools. The predominant native languages…

  7. Incorporating Asymmetric Dependency Patterns in the Evaluation of IS/IT projects Using Real Option Analysis

    ERIC Educational Resources Information Center

    Burke, John C.

    2012-01-01

    The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the…

  8. Bilingual Enrichment Services and Training (Project BEST): Community School District 2, Manhattan. Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Musante, Patricia

    This report presents an evaluation of Bilingual Enrichment Services and Training (Project BEST), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at four schools in Manhattan. The project served 266 Cantonese-, Fukienese, and Mandarin-speaking gifted students of limited English proficiency.…

  9. Follow-Up Evaluation Project. From July 1, 1981 to June 30, 1983. Final Report.

    ERIC Educational Resources Information Center

    Santa Fe Community Coll., Gainesville, FL.

    A project was undertaken to revise a model competency-based trade and industrial education program that had been developed for use in Florida schools in a project that was implemented earlier. During the followup evaluation, the project staff compiled task listings for each of the following trade and industrial education program areas: automotive;…

  10. Performance Evaluation and Software Design for EVA Robotic Assistant Stereo Vision Heads

    NASA Technical Reports Server (NTRS)

    DiPaolo, Daniel

    2003-01-01

    The purpose of this project was to aid the EVA Robotic Assistant project by evaluating and designing the necessary interfaces for two stereo vision heads - the TracLabs Biclops pan-tilt-verge head, and the Helpmate Zebra pan-tilt-verge head. The first half of the project consisted of designing the necessary software interface so that the other modules of the EVA Robotic Assistant had proper access to all of the functionalities offered by each of the stereovision heads. This half took most of the project time, due to a lack of ready-made CORBA drivers for either of the heads. Once this was overcome, the evaluation stage of the project began. The second half of the project was to take these interfaces and to evaluate each of the stereo vision heads in terms of usefulness to the project. In the key project areas such as stability and reliability, the Zebra pan-tilt-verge head came out on top. However, the Biclops did have many more advantages over the Zebra, such as: lower power consumption, faster communications, and a simpler, cleaner API. Overall, the Biclops pan-tilt-verge head outperformed the Zebra pan-tilt-verge head.

  11. Reflections on Evaluation Costs: Direct and Indirect. Evaluation Productivity Project.

    ERIC Educational Resources Information Center

    Alkin, Marvin; Ruskus, Joan A.

    This paper summarizes views on the costs of evaluation developed as part of CSE's Evaluation Productivity Project. In particular, it focuses on ideas about the kinds of costs associated with factors known to effect evaluation utilization. The first section deals with general issues involved in identifying and valuing cost components, particularly…

  12. Healthy city projects in developing countries: the first evaluation.

    PubMed

    Harpham, T; Burton, S; Blue, I

    2001-06-01

    The 'healthy city' concept has only recently been adopted in developing countries. From 1995 to 1999, the World Health Organization (WHO), Geneva, supported healthy city projects (HCPs) in Cox's Bazar (Bangladesh), Dar es Salaam (Tanzania), Fayoum (Egypt), Managua (Nicaragua) and Quetta (Pakistan). The authors evaluated four of these projects, representing the first major evaluation of HCPs in developing countries. Methods used were stakeholder analysis, workshops, document analysis and interviews with 102 managers/implementers and 103 intended beneficiaries. Municipal health plan development (one of the main components of the healthy city strategy) in these cities was limited, which is a similar finding to evaluations of HCPs in Europe. The main activities selected by the projects were awareness raising and environmental improvements, particularly solid waste disposal. Two of the cities effectively used the 'settings' approach of the healthy city concept, whereby places such as markets and schools are targeted. The evaluation found that stakeholder involvement varied in relation to: (i) the level of knowledge of the project; (ii) the project office location; (iii) the project management structure; and (iv) type of activities (ranging from low stakeholder involvement in capital-intensive infrastructure projects, to high in some settings-type activities). There was evidence to suggest that understanding of environment-health links was increased across stakeholders. There was limited political commitment to the healthy city projects, perhaps due to the fact that most of the municipalities had not requested the projects. Consequently, the projects had little influence on written/expressed municipal policies. Some of the projects mobilized considerable resources, and most projects achieved effective intersectoral collaboration. WHO support enabled the project coordinators to network at national and international levels, and the capacity of these individuals (although not necessarily their institutions) was increased by the project. The average annual running cost of the projects was approximately 132,000 US dollars per city, which is close to the costs of the only other HCP for which a cost analysis has been undertaken, Bangkok (115,000 US dollars per year) Recommendations for these and other HCPs are provided.

  13. Stakeholder approach for evaluating organizational change projects.

    PubMed

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  14. 76 FR 78950 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Evaluation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... for OMB Review; Comment Request; Evaluation of the Young Parents Demonstration Project ACTION: Notice...) sponsored information collection request (ICR) proposal titled, ``Evaluation of the Young Parents... evaluate the efficacy of the Young Parents Demonstration Project (YPDP), a grant program designed to...

  15. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    DOT National Transportation Integrated Search

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  16. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    USDA-ARS?s Scientific Manuscript database

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  17. Evaluation of the Cape Seal Process as a Pavement Rehabilitation Alternative

    DOT National Transportation Integrated Search

    1998-10-01

    A 1-year research project was conducted to evaluate the Cape seal process as a pavement rehabilitation technique. During the course of this research project, most of the Cape seal projects that have been constructed within the state were visited as p...

  18. An evaluation of the total quality management implementation strategy for the advanced solid rocket motor project at NASA's Marshall Space Flight Center. M.S. Thesis - Tennessee Univ.

    NASA Technical Reports Server (NTRS)

    Schramm, Harry F.; Sullivan, Kenneth W.

    1991-01-01

    An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.

  19. North Seattle advanced traffic management system (NSATMS) project evaluation

    DOT National Transportation Integrated Search

    2002-12-01

    This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial tr...

  20. Transdisciplinary Research and Evaluation for Community Health Initiatives

    PubMed Central

    Harper, Gary W.; Neubauer, Leah C.; Bangi, Audrey K.; Francisco, Vincent T.

    2010-01-01

    Transdisciplinary research and evaluation projects provide valuable opportunities to collaborate on interventions to improve the health and well-being of individuals and communities. Given team members’ diverse backgrounds and roles or responsibilities in such projects, members’ perspectives are significant in strengthening a project’s infrastructure and improving its organizational functioning. This article presents an evaluation mechanism that allows team members to express the successes and challenges incurred throughout their involvement in a multisite transdisciplinary research project. Furthermore, their feedback is used to promote future sustainability and growth. Guided by a framework known as organizational development, the evaluative process was conducted by a neutral entity, the Quality Assurance Team. A mixed-methods approach was utilized to garner feedback and clarify how the research project goals could be achieved more effectively and efficiently. The multiple benefits gained by those involved in this evaluation and implications for utilizing transdisciplinary research and evaluation teams for health initiatives are detailed. PMID:18936267

  1. NASA TEERM Hexavalent Chrome Alternatives Projects

    NASA Technical Reports Server (NTRS)

    Rothgeb, Matt

    2009-01-01

    This slide presentation reviews the NASA/DOD projects to select an alternative to hexavalent chrome in the aerospace industry. The Phase I process of the project performed: (1) Evaluation and testing of non-chromated coating systems as replacements for hexavalent chrome coatings in aircraft and aerospace applications. (2) Testing of coating systems to DoD and NASA specifications for corrosion resistance and adhesion. (3) Bare corrosion resistance and atmospheric exposure will be focus areas of Phase II Testing. The description includes a chart that summarizes the 3000 hour salt fog test results. The second phase of the project includes (1) Evaluation and testing of coating systems that do not contain hexavalent chrome as replacements for aerospace applications. (2) Evaluation of coatings at Beach Test Site and Launch Complex 39B (3) Evaluation of non-chrome coatings for electronic housings (bare corrosion resistance and electrical impedance) is a part of this round of testing. This project was performed for the Technology Evaluation for Environmental Risk Mitigation (TEERM)

  2. The ZOG Technology Demonstration Project: A System Evaluation of USS CARL VINSON (CVN 70)

    DTIC Science & Technology

    1984-12-01

    part of a larger project involving development of a wide range of computer technologies, including artifcial intelligence and a long-range computer...shipboard manage- ment, aircraft management, expert systems, menu selection, man- machine interface, artificial intelligence , automation; shipboard It AWM...functions, planning, evaluation, training, hierarchical data bases The objective of this project was to conduct an evaluation of ZOG, a general purpose

  3. How Can We Confidently Judge the Extent to Which Student Voice in Higher Education Has Been Genuinely Amplified? A Proposal for a New Evaluation Framework

    ERIC Educational Resources Information Center

    Seale, Jane

    2016-01-01

    This article aims to contribute to the development of frameworks for evaluating student voice projects in higher education by offering a critically evaluative account of two student voice projects. Although both projects had been underpinned by the principles of participatory (inclusive) research, one appeared to be more successful than the other…

  4. Development and Evaluation of an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    ERIC Educational Resources Information Center

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    An on-line module on disease prevention was created for 4-H volunteer leaders who work with livestock projects in Washington to better prepare them to teach youth about bio-security and its importance in 4-H livestock projects. Evaluation of the module and usage statistics since the module's debut were collected and evaluated. The module increases…

  5. Development and Evaluation of an On-Line Educational Module for Volunteer Leaders on Bio-Security in Washington State 4-H Livestock Projects

    ERIC Educational Resources Information Center

    Stevenson, Jill L.; Moore, Dale A.; Newman, Jerry; Schmidt, Janet L.; Smith, Sarah M.; Smith, Jean; Kerr, Susan; Wallace, Michael; BoyEs, Pat

    2011-01-01

    A module on disease prevention was created for 4-H volunteer leaders who work with livestock projects in Washington to better prepare them to teach youth about bio-security and its importance in 4-H livestock projects. Evaluation of the module and usage statistics since the module's debut were collected and evaluated. The module increases…

  6. Evaluation of the Impact of ESEA Title I Programs for Migrant Children of Migrant Agricultural Workers. Volume IV--Appendices. Final Report.

    ERIC Educational Resources Information Center

    Exotech Systems, Inc., Falls Church, VA.

    Volume IV of the evaluation report consists of case studies from 10 migrant education projects in 8 of the sample States. These projects were visited in July through September 1973. The case studies give noteworthy or innovative aspects of the projects, detailed descriptions, and the functions. The projects are: (1) Harnett County Summer Migrant…

  7. A Social Studies Curriculum for a Modern World. The Marin Social Studies Project. Final Report.

    ERIC Educational Resources Information Center

    Lester, G. Sidney; And Others

    The major portion of this report provides a narrative summary and description of the work of the project, its context, evaluation, and recommendations. The major objectives of this three-year project were to: 1) field test and evaluate new K-12 social studies curriculum project materials, and 2) design a new K-12 social studies framework based on…

  8. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    NASA Astrophysics Data System (ADS)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  9. Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES). Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    This report presents an evaluation of the Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at DeWitt Clinton High School in the Bronx and George Washington High School in Manhattan. The project served…

  10. Harmony in Career Learning and Scholastic System (Project HI-CLASS) 1989-90. OREA Final Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Board of Education's Project Harmony in Career Learning and Scholastic System (Project HI-CLASS) for 1989-90. In its second year of a funding cycle, the project offered 635 Chinese- and Spanish-speaking high school students of limited English proficiency instruction in English as a Second Language (ESL),…

  11. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    NASA Astrophysics Data System (ADS)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  12. 9th Annual CMMI Technology Conference and User Group-Tuesday

    DTIC Science & Technology

    2009-11-19

    evaluating and quantifying risk likelihood and severity risks. Step 4 Project defines thresholds for each risk category. Step 5 Project defines bounds on the...defines consistent criteria for evaluating and quantifying risk likelihood and severity risks in the Risk Management Plan. Step 4 Project defines

  13. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  14. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  15. What and How Are We Evaluating? Meta-Evaluation Study of the NASA Innovations in Climate Education (NICE) Portfolio

    NASA Astrophysics Data System (ADS)

    Martin, A. M.; Barnes, M. H.; Chambers, L. H.; Pippin, M. R.

    2011-12-01

    As part of NASA's Minority University Research and Education Program (MUREP), the NASA Innovations in Climate Education (NICE) project at Langley Research Center has funded 71 climate education initiatives since 2008. The funded initiatives span across the nation and contribute to the development of a climate-literate public and the preparation of a climate-related STEM workforce through research experiences, professional development opportunities, development of data access and modeling tools, and educational opportunities in both K-12 and higher education. Each of the funded projects proposes and carries out its own evaluation plan, in collaboration with external or internal evaluation experts. Using this portfolio as an exemplar case, NICE has undertaken a systematic meta-evaluation of these plans, focused primarily on evaluation questions, approaches, and methods. This meta-evaluation study seeks to understand the range of evaluations represented in the NICE portfolio, including descriptive information (what evaluations, questions, designs, approaches, and methods are applied?) and questions of value (do these evaluations meet the needs of projects and their staff, and of NASA/NICE?). In the current climate, as federal funders of climate change and STEM education projects seek to better understand and incorporate evaluation into their decisions, evaluators and project leaders are also seeking to build robust understanding of program effectiveness. Meta-evaluations like this provide some baseline understanding of the current status quo and the kinds of evaluations carried out within such funding portfolios. These explorations are needed to understand the common ground between evaluative best practices, limited resources, and agencies' desires, capacity, and requirements. When NASA asks for evaluation of funded projects, what happens? Which questions are asked and answered, using which tools? To what extent do the evaluations meet the needs of projects and program officers? How do they contribute to best practices in climate science education? These questions are important to ask about STEM and climate literacy work more generally; the NICE portfolio provides a broad test case for thinking strategically, critically, and progressively about evaluation in our community. Our findings can inform the STEM education, communication, and public outreach communities, and prompt us to consider a broad range of informative evaluation options. During this presentation, we will consider the breadth, depth and utility of evaluations conducted through a NASA climate education funding opportunity. We will examine the relationship between what we want to know about education programs, what we want to achieve with our interventions, and what we ask in our evaluations.

  16. What and How Are We Evaluating? Meta-Evaluation Study of the NASA Innovations in Climate Education (NICE) Portfolio

    NASA Astrophysics Data System (ADS)

    Martin, A. M.; Barnes, M. H.; Chambers, L. H.; Pippin, M. R.

    2013-12-01

    As part of NASA's Minority University Research and Education Program (MUREP), the NASA Innovations in Climate Education (NICE) project at Langley Research Center has funded 71 climate education initiatives since 2008. The funded initiatives span across the nation and contribute to the development of a climate-literate public and the preparation of a climate-related STEM workforce through research experiences, professional development opportunities, development of data access and modeling tools, and educational opportunities in both K-12 and higher education. Each of the funded projects proposes and carries out its own evaluation plan, in collaboration with external or internal evaluation experts. Using this portfolio as an exemplar case, NICE has undertaken a systematic meta-evaluation of these plans, focused primarily on evaluation questions, approaches, and methods. This meta-evaluation study seeks to understand the range of evaluations represented in the NICE portfolio, including descriptive information (what evaluations, questions, designs, approaches, and methods are applied?) and questions of value (do these evaluations meet the needs of projects and their staff, and of NASA/NICE?). In the current climate, as federal funders of climate change and STEM education projects seek to better understand and incorporate evaluation into their decisions, evaluators and project leaders are also seeking to build robust understanding of program effectiveness. Meta-evaluations like this provide some baseline understanding of the current status quo and the kinds of evaluations carried out within such funding portfolios. These explorations are needed to understand the common ground between evaluative best practices, limited resources, and agencies' desires, capacity, and requirements. When NASA asks for evaluation of funded projects, what happens? Which questions are asked and answered, using which tools? To what extent do the evaluations meet the needs of projects and program officers? How do they contribute to best practices in climate science education? These questions are important to ask about STEM and climate literacy work more generally; the NICE portfolio provides a broad test case for thinking strategically, critically, and progressively about evaluation in our community. Our findings can inform the STEM education, communication, and public outreach communities, and prompt us to consider a broad range of informative evaluation options. During this presentation, we will consider the breadth, depth and utility of evaluations conducted through a NASA climate education funding opportunity. We will examine the relationship between what we want to know about education programs, what we want to achieve with our interventions, and what we ask in our evaluations.

  17. Evaluating the Relevance, Reliability, and Applicability of CMIP5 Climate Projections for Water Resources and Environmental Planning

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Scott, J.; Ferguson, I. M.; Arnold, J.; Raff, D. A.; Webb, R. S.

    2012-12-01

    Water managers need to understand the applicability of climate projection information available for decision-support at the scale of their applications. Applicability depends on information reliability and relevance. This need to understand applicability stems from expectations that entities rationalize adaptation investments or decisions to delay investment. It is also occurring at a time when new global climate projections are being released through the World Climate Research Programme Coupled Model Intercomparison Project phase 5 (CMIP5), which introduces new information opportunities and interpretation challenges. This project involves an interagency collaboration to evaluate the applicability of CMIP5 projections for use in water and environmental resources planning. The overarching goal is to develop and demonstrate a framework that involves dual evaluations of relevance and reliability informing an ultimate discussion and judgment of applicability, which is expected to vary with decision-making context. The framework is being developed and demonstrated within the context of reservoir systems management in California's Sacramento and San Joaquin River basins. The relevance evaluation focuses on identifying the climate variables and statistical measures relevant to long-term management questions, which may depend on satisfying multiple objectives. Past studies' results are being considered in this evaluation, along with new results from system sensitivity analyses conducted through this effort. The reliability evaluation focuses on the CMIP5 climate models' ability to simulate past conditions relative to observed references. The evaluation is being conducted across the global domain using a large menu of climate variables and statistical measures, leveraging lessons learned from similar evaluations of CMIP3 climate models. The global focus addresses a broader project goal of producing a web resource that can serve reliability information to applicability discussions around the world, with evaluation results being served through a web-portal similar to that developed by NOAA/CIRES to serve CMIP3 information on future climate extremes (http://www.esrl.noaa.gov/psd/ipcc/extremes/). The framework concludes with an applicability discussion informed by relevance and reliability results. The goal is to observe the discussion process and identify features, choice points, and challenges that might be summarized and shared with other resource management groups facing applicability questions. This presentation will discuss the project framework and preliminary results. In addition to considering CMIP5 21st century projection information, the framework is being developed to support evaluation of CMIP5 decadal predictability experiment simulations and reconcile those simulations with 21st century projections. The presentation will also discuss implications of considering the applicability of bias-corrected and downscaled information within this framework.

  18. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume I. Project conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less

  19. Substance abuse intervention for health care workers: a preliminary report.

    PubMed

    Lapham, S C; Chang, I; Gregory, C

    2000-05-01

    The Workplace Managed Care Cooperative Agreement project targets 3,300 health care professionals in hospital, specialty clinic, and primary care settings located in metropolitan New Mexico communities. This project will evaluate whether enhancements to existing substance abuse prevention/early intervention programs can prevent the onset of risky drinking, reduce prevalence of risky drinking, better identify employees who abuse alcohol and drugs, and improve employee wellness. This article describes one such enhancement (Project WISE [Workplace Initiative in Substance Education]), implemented at Lovelace Health Systems. Project WISE includes relatively low-cost elements such as substance abuse awareness training, information on how to reduce drinking, and brief motivational counseling. Evaluation will consist of baseline comparisons of the intervention and comparison sites, a process evaluation, a qualitative analysis using focus groups, and an outcome evaluation using health and work records. Methodological challenges, solutions, and implications for researchers undertaking similar projects are presented.

  20. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  1. Oneida Language Project: Evaluative Report.

    ERIC Educational Resources Information Center

    Grittner, Frank M.

    Based on data collected during site visits in March 1978 to four Wisconsin school districts (Freedom, Pulaski, Seymour, and West DePere), this document evaluates a state project on Oneida language instruction. The project evolved from an expressed interest by Oneida Tribal members, elementary school children, and university students in learning…

  2. Project Developmental Continuity Evaluation: Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Bond, James T.; Rosario, Jose

    This executive summary presents the major results of the longitudinal evaluation of Project Developmental Continuity (PDC). A Head Start demonstration project initiated by the Administration for Children, Youth and Families (ACYF) in 1974, the PDC aimed to stimulate the development and implementation of comprehensive programs linking Head Start…

  3. Project Developmental Continuity Evaluation: Final Report. Appendices to Volume I.

    ERIC Educational Resources Information Center

    Bond, James T.; And Others

    This document provides the appendices for volume 1 of the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades.…

  4. An Evaluation of Project Gifted 1971-1972.

    ERIC Educational Resources Information Center

    Renzulli, Joseph S.

    Evaluated was Project Gifted, a tri-city (Cranston, East Providence, and Warwick, Rhode Island) program which focused on the training of gifted children in grades 4-6 in the creative thinking process. Project goals were identification of gifted students, development of differential experiences, and development of innovative programs. Cranston's…

  5. ASPER Research and Evaluation Projects 1970-79.

    ERIC Educational Resources Information Center

    1980

    This inventory of research and evaluation projects completed during calendar years 1970-1979 for the Office of the Assistant Secretary for Policy, Education, and Research (ASPER) of the Department of Labor contains summaries of projects on economic, social, and policy background; the labor market; the nature and impact of Department of Labor…

  6. Project Crossroads as Pre-Trial Intervention. A Program Evaluation.

    ERIC Educational Resources Information Center

    Rovner-Pieczenik, Roberta

    This report describes and evaluates Project Crossroads, a manpower approach to the rehabilitation of accused offenders prior to adjudication. In order to demonstrate the feasibility of working with the court and its personnel to provide a pretrial intervention alternative for youthful first-time offenders, Project Crossroads provided a…

  7. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  8. Comprehensive Evaluation of the 1996 Interdisciplinary Teamed Instruction Summer Institute.

    ERIC Educational Resources Information Center

    Meehan, Merrill L.; Cowley, Kimberly S.

    The Interdisciplinary Teamed Instruction (ITI) Project was a 2-year project aimed at determining the effects of ITI on teaching and learning and at validating the effectiveness of a professional development model to facilitate development, implementation, and evaluation of ITI. Through summer institutes and onsite workshops, project staff provided…

  9. Arsenic Removal from Drinking Water by Adsorptive Media USEPA Demonstration Project at Rimrock AZ Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the Arizona Water Company (AWC) facility in Rimrock, AZ. The objectives of the project were to evaluate: 1) the effectiveness of ...

  10. Evaluation of the Family/School Partnership Project, Year III, 1996-97.

    ERIC Educational Resources Information Center

    Kester, Donald L.; Plakos, John; Santos, Will

    The report details the third-year evaluation of a transitional bilingual education project at Chester W. Nimitz Middle School in Huntington Park, California. The Family/School Partnership Project is designed to assist limited English proficient students in mastering English skills to transition to regular classroom activities by integrating…

  11. Evaluation of Career Education Projects, 1976-1977. Report #7829.

    ERIC Educational Resources Information Center

    Chern, Hermine J.; And Others

    Evaluations of thirty career education projects in the school district of Philadelphia, Pennsylvania are contained in this report. Fifteen of the projects concern classroom or shop instruction, six concern development and/or field testing of curriculum materials, and the remainder involve staff development, installation of shop equipment, job…

  12. The CAI/Cooperative Learning Project. First Year Evaluation Report.

    ERIC Educational Resources Information Center

    Beyer, Francine S.

    This report presents a first year evaluation of the Computer Assisted Instruction (CAI)/ Cooperative Learning Project, a 3-year collaborative effort by two Pennsylvania school districts--the Pittston Area School District and the Hatboro-Horsham School District--and Research for Better Schools (RBS). The project proposed to integrate advanced…

  13. Evaluation on Cost Overrun Risks of Long-distance Water Diversion Project Based on SPA-IAHP Method

    NASA Astrophysics Data System (ADS)

    Yuanyue, Yang; Huimin, Li

    2018-02-01

    Large investment, long route, many change orders and etc. are main causes for costs overrun of long-distance water diversion project. This paper, based on existing research, builds a full-process cost overrun risk evaluation index system for water diversion project, apply SPA-IAHP method to set up cost overrun risk evaluation mode, calculate and rank weight of every risk evaluation indexes. Finally, the cost overrun risks are comprehensively evaluated by calculating linkage measure, and comprehensive risk level is acquired. SPA-IAHP method can accurately evaluate risks, and the reliability is high. By case calculation and verification, it can provide valid cost overrun decision making information to construction companies.

  14. Field Evaluation of Advanced Methods of Subsurface Exploration for Transit Tunneling

    DOT National Transportation Integrated Search

    1980-06-01

    This report presents the results of a field evaluation of advanced methods of subsurface exploration on an ongoing urban rapid transit tunneling project. The objective of this study is to evaluate, through a field demonstration project, the feasibili...

  15. Final report of evaluation of masonry coatings : phase II.

    DOT National Transportation Integrated Search

    1972-11-01

    This research project was undertaken to evaluate several coating systems for concrete masonry to replace the presently used Class 2 rubbed finish. This is the report of Phase II, the field evaluation, of that project. : In early October 1970, applica...

  16. STORMWATER BEST MANAGEMENT PRACTICES TEST FACILITY - SWALES

    EPA Science Inventory

    The NRMRL swale evaluation is part of a larger collection of long-term research projects that evaluates many Best Management Practices. EPA has ongoing research examining the performance of constructed wet lands, and detention and retention ponds. Other projects will evaluate ra...

  17. Statewide ITS earmark evaluation, Part B : executive summary

    DOT National Transportation Integrated Search

    2003-11-01

    As the recipient of ITS Integration Program funds, WisDOT is required to perform a self-evaluation on each program supported : by the funds. The report includes the results of that evaluation for five projects. Specific projects include: 1) Statewide...

  18. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    PubMed

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  19. Job Sharing Pilot Project in the Department of Education: Final Evaluation. A Report to the Legislature of the State of Hawaii. No. 81-10.

    ERIC Educational Resources Information Center

    Tanimura, Clinton T.

    Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…

  20. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  1. Dynamic systems and the role of evaluation: The case of the Green Communities project.

    PubMed

    Anzoise, Valentina; Sardo, Stefania

    2016-02-01

    The crucial role evaluation can play in the co-development of project design and its implementation will be addressed through the analysis of a case study, the Green Communities (GC) project, funded by the Italian Ministry of Environment within the EU Interregional Operational Program (2007-2013) "Renewable Energy and Energy Efficiency". The project's broader goals included an attempt to trigger a change in Italian local development strategies, especially for mountain and inland areas, which would be tailored to the real needs of communities, and based on a sustainable exploitation and management of the territorial assets. The goal was not achieved, and this paper addresses the issues of how GC could have been more effective in fostering a vision of change, and which design adaptations and evaluation procedures would have allowed the project to better cope with the unexpected consequences and resistances it encountered. The conclusions drawn are that projects should be conceived, designed and carried out as dynamic systems, inclusive of a dynamic and engaged evaluation enabling the generation of feedbacks loops, iteratively interpreting the narratives and dynamics unfolding within the project, and actively monitoring the potential of various relationships among project participants for generating positive social change. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. Linking user and staff perspectives in the evaluation of innovative transition projects for youth with disabilities.

    PubMed

    McAnaney, Donal F; Wynne, Richard F

    2016-06-01

    A key challenge in formative evaluation is to gather appropriate evidence to inform the continuous improvement of initiatives. In the absence of outcome data, the programme evaluator often must rely on the perceptions of beneficiaries and staff in generating insight into what is making a difference. The article describes the approach adopted in an evaluation of 15 innovative projects supporting school-leavers with disabilities in making the transition to education, work and life in community settings. Two complementary processes provided an insight into what project staff and leadership viewed as the key project activities and features that facilitated successful transition as well as the areas of quality of life (QOL) that participants perceived as having been impacted positively by the projects. A comparison was made between participants' perceptions of QOL impact with the views of participants in services normally offered by the wider system. This revealed that project participants were significantly more positive in their views than participants in traditional services. In addition, the processes and activities of the more highly rated projects were benchmarked against less highly rated projects and also with usually available services. Even in the context of a range of intervening variables such as level and complexity of participant needs and variations in the stage of development of individual projects, the benchmarking process indicated a number of project characteristics that were highly valued by participants. © The Author(s) 2016.

  3. Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Usui, Hideo; Izumo, Sari; Tachibana, Mitsuo

    Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management datamore » such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)« less

  4. Evaluating public participation in environmental decision-making: EPA's superfund community involvement program.

    Treesearch

    Susan Charnley; Bruce Engelbert

    2005-01-01

    This article discusses an 8-year, ongoing project that evaluates the Environmental Protection Agency's Superfund community involvement program. The project originated as a response to the Government Performance and Results Act, which requires federal agencies to articulate program goals, and evaluate and report their progress in meeting those goals. The evaluation...

  5. Workplace Literacy Program (WPL) at Chinatown Manpower Project, Inc. Final Evaluation.

    ERIC Educational Resources Information Center

    Friedenberg, Joan E.

    This document describes the procedures for and results of the external evaluation of the workplace literacy program for underemployed garment industry workers with low English skills at Chinatown Manpower Project, Inc. in Chinatown in New York City. The document describes the evaluation design and methodology as well as the evaluation results,…

  6. Program Impact Evaluations: An Introduction for Managers of Title VII Projects. A Draft Guidebook.

    ERIC Educational Resources Information Center

    Bissell, Joan S.

    Intended to assist administrators in the planning, management, and utilization of evaluation, this guidebook is designed as an introduction and supplement to other evaluation materials for bilingual education programs being developed under federal sponsorship, including evaluation models for Title VII projects. General information is provided on…

  7. Teaching Research and Practice Evaluation Skills to Graduate Social Work Students

    ERIC Educational Resources Information Center

    Wong, Stephen E.; Vakharia, Sheila P.

    2012-01-01

    Objective: The authors examined outcomes of a graduate course on evaluating social work practice that required students to use published research, quantitative measures, and single-system designs in a simulated practice evaluation project. Method: Practice evaluation projects from a typical class were analyzed for the number of research references…

  8. Conducting Site and Economic Renewable Energy Project Feasibility Assessments

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.

  9. 40 CFR 57.604 - Evaluation of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Evaluation of projects. 57.604 Section 57.604 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... independent engineering firm to prepare written reports at least annually which evaluate each completed...

  10. Childhood Obesity Research Demonstration Project: Cross-Site Evaluation Methods

    PubMed Central

    Lee, Rebecca E.; Mehta, Paras; Thompson, Debbe; Bhargava, Alok; Carlson, Coleen; Kao, Dennis; Layne, Charles S.; Ledoux, Tracey; O'Connor, Teresia; Rifai, Hanadi; Gulley, Lauren; Hallett, Allen M.; Kudia, Ousswa; Joseph, Sitara; Modelska, Maria; Ortega, Dana; Parker, Nathan; Stevens, Andria

    2015-01-01

    Abstract Introduction: The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which the CORD model is associated with changes in behavior, body weight, BMI, quality of life, and healthcare satisfaction in children 2–12 years of age. Design/Methods: The CORD Evaluation Center (EC-CORD) will analyze the pooled data from three independent demonstration projects that each integrate public health and primary care childhood obesity interventions. An extensive set of common measures at the family, facility, and community levels were defined by consensus among the CORD projects and EC-CORD. Process evaluation will assess reach, dose delivered, and fidelity of intervention components. Impact evaluation will use a mixed linear models approach to account for heterogeneity among project-site populations and interventions. Sustainability evaluation will assess the potential for replicability, continuation of benefits beyond the funding period, institutionalization of the intervention activities, and community capacity to support ongoing program delivery. Finally, cost analyses will assess how much benefit can potentially be gained per dollar invested in programs based on the CORD model. Conclusions: The keys to combining and analyzing data across multiple projects include the CORD model framework and common measures for the behavioral and health outcomes along with important covariates at the individual, setting, and community levels. The overall objective of the comprehensive evaluation will develop evidence-based recommendations for replicating and disseminating community-wide, integrated public health and primary care programs based on the CORD model. PMID:25679060

  11. Project Developmental Continuity Evaluation: Final Report. Volume II: The Process of Program Implementation in PDC.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The second of two volumes, this document continues the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades. In particular,…

  12. Project Developmental Continuity Evaluation: Final Report. Volume I: Outcomes of the PDC Intervention.

    ERIC Educational Resources Information Center

    Bond, James T.; And Others

    The first of two volumes, this document reports an evaluation of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary years. In general, the impact of program…

  13. ARSENIC REMOVAL FROM DRINKING WATER BY PROCESS MODIFICATION TO COAGULATION/FILTRATION. USEPA DEMONSTRATION PROJECT AT LIDGERWOOD, ND. FINAL PERFORMANCE EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Lidgerwood, North Dakota site. The objectives of the project were to evaluate: (1) the effectiveness of process modifications to an e...

  14. Discrimination Training and Formative Evaluation for Remediation in Basic Waxing Skills.

    ERIC Educational Resources Information Center

    Knight, G. William; Guenzel, Pamela

    1990-01-01

    An experimental group (n=6) of student dentists received discrimination training and self-evaluation exercises on 4 waxing projects and 4 handpiece projects over 13 hours. An equivalent "conventional" group (n=7) received verbal feedback with models on 7 waxing projects over 13 hours. The experimental group outperformed the conventional…

  15. TRIM timber projections: an evaluation based on forest inventory measurements.

    Treesearch

    John R. Mills

    1989-01-01

    Two consecutive timberland inventories collected from permanent plots in the natural pine type in North Carolina were used to evaluate the timber resource inventory model (TRIM). This study compares model predictions with field measurements and examines the effect of inventory data aggregation on the accuracy of projections. Projections were repeated for two geographic...

  16. How to Assign Individualized Scores on a Group Project: An Empirical Evaluation

    ERIC Educational Resources Information Center

    Zhang, Bo; Ohland, Matthew W.

    2009-01-01

    One major challenge in using group projects to assess student learning is accounting for the differences of contribution among group members so that the mark assigned to each individual actually reflects their performance. This research addresses the validity of grading group projects by evaluating different methods that derive individualized…

  17. Evaluation of Seeds of Science/Roots of Reading Project: "Shoreline Science" and "Terrarium Investigations." CSE Technical Report 676

    ERIC Educational Resources Information Center

    Wang, Jia; Baker, Eva L.

    2006-01-01

    This project was initiated in order to evaluate two literacy and science integrated instruction units, "Shoreline Science" and "Terrarium Investigations," designed by the Lawrence Hall of Science "Seeds of Science/Roots of Reading" Project ("Seeds/Roots"). We examined how the integrated units affect student…

  18. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Dummerston, VT Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Charette Mobile Home Park (CMHP) in Dummerston, Vermont. The objectives of the project were to evaluate: (1) the effectiveness of an Aqua...

  19. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Brown City, MI Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project in Brown City, MI. The objectives of the project were to evaluate (1) the effectiveness of a Severn Trent Services (STS) adsorptive media s...

  20. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Goffstown, NH, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Orchard Highlands Subdivision site in Goffstown, NH. The main objective of the project was to evaluate the effectiveness of AdEdge T...

  1. To Green or Not to Green? Evaluation of Green Stormwater Infrastructure in Kansas City Middle Blue River Project

    EPA Science Inventory

    The City of Kansas City, Mo., Water Services Department is implementing a pilot project to measure and evaluate the performance of green infrastructure. Information obtained through this pilot project will be used to guide the design of green solutions throughout Kansas City und...

  2. Project Kanpe, 1981-1982. O.E.E. Evaluation Report.

    ERIC Educational Resources Information Center

    Keane, Demetra N.; And Others

    Project Kanpe was a bilingual program intended to help older, talented Haitian students at three New York City high schools acquire English language proficiency while developing their academic skills. According to this evaluation, the project instead served students in critical need of basic skills and remediation. The following points are made:…

  3. Arsenic Removal from Drinking Water by Adsorptive Media, U.S. EPA Demonstration Project at Lead, South Dakota - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Lead, South Dakota. The main objective of the project was to evaluate the effectiveness of SolmeteX’s adsorptive media system in removin...

  4. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Town of Arnaudville, LA - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the United Water Systems’ facility in Arnaudville, LA. The objectives of the project were to evaluate: (1) the effectiveness of K...

  5. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project were to evaluate: 1) the effect...

  6. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Village of Waynesville, IL - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal drinking water treatment technology demonstration project at the Village of Waynesville, IL. The main objective of the project was to evaluate the effectiveness of the Peerless coagu...

  7. Preliminary Evaluation of Office of Academic Achievement's Programs 1990-1991. Report No. 91-4.

    ERIC Educational Resources Information Center

    Swanson, Judy

    Three programs sponsored by the Seattle (Washington) public schools' Office of Academic Achievement were evaluated: the Academic Achievement Project, Early Childhood Model (ECM) Schools, and Pilot Projects. Academic Achievement projects were designed to increase the academic achievement of at-risk learners and to decrease disproportionality. The…

  8. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Climax, MN site. The objectives of the project are to evaluate (1) the effectiveness of Kinetico’s Macrolite®...

  9. Managing the Podcast Lecture: A Hybrid Approach for Online Lectures in the Business Classroom

    ERIC Educational Resources Information Center

    Hollandsworth, Randall J.

    2007-01-01

    This article discusses a pilot project applying podcast technology to a management course. The project was designed, implemented, and evaluated in spring 2006 in conjunction with the Management and Supervisory Development program at Athens Technical College (Athens, Georgia). The project goals were to evaluate the pedagogical, logistical, and…

  10. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    ERIC Educational Resources Information Center

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  11. 49 CFR 611.303 - Small Starts project justification criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and assign ratings for project justification, FTA will evaluate information developed locally through the planning, NEPA and project development processes. (1) The method used by FTA to evaluate and rate... ratings for each of the criteria in § 611.303(b)(1) through (6) will be expressed in terms of descriptive...

  12. 49 CFR 611.203 - New Starts project justification criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... project justification, FTA will evaluate information developed locally through the planning and NEPA processes. (1) The method used by FTA to evaluate and rate projects will be a multiple measure approach by... each of the criteria in § 611.203(b)(1) through (6) will be expressed in terms of descriptive...

  13. 49 CFR 611.303 - Small Starts project justification criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and assign ratings for project justification, FTA will evaluate information developed locally through the planning, NEPA and project development processes. (1) The method used by FTA to evaluate and rate... ratings for each of the criteria in § 611.303(b)(1) through (6) will be expressed in terms of descriptive...

  14. 49 CFR 611.203 - New Starts project justification criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... project justification, FTA will evaluate information developed locally through the planning and NEPA processes. (1) The method used by FTA to evaluate and rate projects will be a multiple measure approach by... each of the criteria in § 611.203(b)(1) through (6) will be expressed in terms of descriptive...

  15. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    ERIC Educational Resources Information Center

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  16. Prevention Work with Children Disaffected from School: Findings from the Evaluation of Two Innovative Community-Based Projects

    ERIC Educational Resources Information Center

    Gray, Paul; Seddon, Toby

    2005-01-01

    Purpose: To report on findings from the evaluation of two innovative community-based prevention projects in the UK targeted at children disaffected from school, one involving football the other horticulture. Design/methodology/approach: Qualitative inquiry focusing on three areas: "theories of change" underpinning the projects; referral…

  17. GEAR UP Aspirations Project Evaluation

    ERIC Educational Resources Information Center

    Trimble, Brad A.

    2013-01-01

    The purpose of this study was to conduct a formative evaluation of the first two years of the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) Aspirations Project (Aspirations) using a Context, Input, Process, and Product (CIPP) model so as to gain an in-depth understanding of the project during the middle school…

  18. Final evaluation Report, 1975-76. ESAA III Pilot Project Assist.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This evaluation report is presented at the conclusion of the third year of Project Assist, a program funded under the Emergency School Assistant Act (ESAA). The main focus of the project was on improving student reading and mathematics skills primarily through contact with instructional teacher aides and special supplementary instructional…

  19. 34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of the evaluation plan for the project, including the extent to which the applicant's methods of... part: (a) Determination of need for the project. (10 points). The Secretary reviews each application to assess the effectiveness of the procedures used by the applicant in determining need for the project...

  20. K-6 Early Intervention Project: Evaluation of the First Year of Implementation.

    ERIC Educational Resources Information Center

    McDaid, Janet L.

    California's K-6 Early Intervention Project was established in 1986 under the authority of California Assembly Bill 1535, Pilot Project on Hyperactivity, to provide a system of early identification and assistance to children in kindergarten through grade 6 whose behavior problems interfere with learning. This report contains evaluation findings…

  1. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. U.S. EPA DEMONSTRATION PROJECT AT CLIMAX, MN. FINAL PERFORMANCE EVALUATION REPORT.

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project following one year of operation at the Climax, Minnesota, site. The objectives of the project were to evaluate: (1) the effectiveness of Kin...

  2. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Rollinsford, NH, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Rollinsford, New Hampshire. The objectives of the project were to evaluate: 1) the effectiveness of AdEdge Technologies’ AD -33TM media ...

  3. 1973-1974 E.S.E.A. Title I Evaluation Report.

    ERIC Educational Resources Information Center

    Saint Louis Board of Education, MO.

    This Illinois District 189, East St. Louis Public Schools, 1973-1974 evaluation report on programs, services, activities and projects funded in whole or in part under Title I of the 1965 Elementary Secondary Education Act is organized into five parts. Part One, 'Title I Projects' comprises reports on seven projects. Continuing Education for…

  4. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTION MEDIA USEPA DEMONSTRATION PROJECT AT BROWN CITY, MI SIX MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project in Brown City, MI. The objectives of the project are to evaluate the effectiveness of Severn Trent Services (...

  5. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA, USEPA DEMONSTRATION PROJECT AT RIMROCK, AZ, SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Rimrock, AZ. The objectives of the project are to evaluate the effectiveness of AdEdge Arsenic Package Uni...

  6. Arsenic Removal from Drinking Water by Absorptive Media-U.S. EPA Demonstration Project at Desert Sands MDWCA, NM Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Desert Sands Mutual Domestic Water Consumers Association (MDWCA) facility in Anthony, NM. The objectives of the project were to evalu...

  7. Florida Title VI Education for the Handicapped Project Evaluation Reports.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Elementary and Secondary Education.

    Reported were 11 project evaluations for fiscal year 1971 for 17 Florida county projects concerning educational program effectiveness for handicapped children, as authorized by P.L. 91-230, Education of the Handicapped Act, and funded by the federal government. Eight priority problem areas established were the needs for instructional resource and…

  8. Building Community Capacities in Evaluating Rural IT Projects: Success Strategies from the LEARNERS Project

    ERIC Educational Resources Information Center

    Lennie, June; Hearn, Greg; Simpson, Lyn; Kimber, Megan

    2005-01-01

    Given the current emphasis on the benefits of communication and information technologies (C&IT) for sustainable rural community development, effective evaluations of C&IT initiatives are increasingly important. This paper presents outcomes of a project that aimed to build capacities of people in two Australian rural communities to evaluate…

  9. Project evaluation process manual

    DOT National Transportation Integrated Search

    1997-07-01

    Describes the process for evaluating airport environments, safety standards, airport infrastructure, licensing standards and multitransportational systems. The project rating system is intended to be used for determining state and federal funding.

  10. Evaluating Dual Career Guidance Programs for High School and College Students. Final Report. Project No. 2-2F11 from July 1, 1981 to June 30, 1982.

    ERIC Educational Resources Information Center

    Amatea, Ellen S.; Cross, E. Gail

    The Dual Career Guidance Project is a career guidance development project to design materials and models for professionals to use in assisting young men and women to develop awareness of and skills in managing a dual worker/career life style. The specific objectives of the project were to design and implement field test evaluation strategies for…

  11. NCMS PWB Surface Finishes Team project summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kokas, J.; DeSantis, C.; Wenger, G.

    1996-04-01

    The NCMS PWB Surface Finishes Consortium is just about at the end of the five year program. Dozens of projects related to surface finishes and PWB solder-ability were performed by the team throughout the program, and many of them are listed in this paper. They are listed with a cross reference to where and when a technical paper was presented describing the results of the research. However, due to time and space constraints, this paper can summarize the details of only three of the major research projects accomplished by the team. The first project described is an ``Evaluation of PWBmore » Surface Finishes.`` It describes the solderability, reliability, and wire bondability of numerous surface finishes. The second project outlined is an ``Evaluation of PWB Solderability Test Methods.`` The third project outlined is the ``Development and Evaluation of Organic Solderability Preservatives.``« less

  12. [Analysis of projects funded by NSFC in field of processing Chinese materia medica in recent five years].

    PubMed

    Chen, Lei; Xia, Xing; He, Bo-sai; Hah, Li-wei

    2015-05-01

    The general situation of the approved and concluded projects of National Natural Science Foundation of China in the field of processing Chinese Materia Medica in recent five years has been reviewed. The progresses and achievements of some projects have been summarized in accordance with research area such as the processing principle, the processing technology, quality evaluation, toxicity and safety evaluation, etc. The researchers and project support units of the funded projects have been analyzed, and the problems of the applications have been also summarized.

  13. Workforce development and effective evaluation of projects.

    PubMed

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  14. Multistakeholder Evaluation of Condominial Sewer Services

    ERIC Educational Resources Information Center

    Nance, Earthea

    2005-01-01

    A multistakeholder evaluation procedure is presented to address the many challenges in evaluating the performance of condominial sewer projects in Brazil. Condominial sewerage is a promising appropriate technology that is coproduced by users and public agencies, but little is known about project performance. This article shows that…

  15. Evaluating Social Programs at the State and Local Level. The JTPA Evaluation Design Project.

    ERIC Educational Resources Information Center

    Blalock, Ann Bonar, Ed.; And Others

    This book on evaluating social programs is an outcome of the Job Training Partnership Act (JTPA) Evaluation Design Project, which produced a set of 10 guides for the evaluation of state and local JTPA programs. This book distills ideas from these guides and applies them to a larger context. Part 1 presents a general approach to program evaluation…

  16. Evaluation Criteria of Noninvasive Telemonitoring for Patients With Heart Failure: Systematic Review.

    PubMed

    Farnia, Troskah; Jaulent, Marie-Christine; Steichen, Olivier

    2018-01-16

    Telemonitoring can improve heart failure (HF) management, but there is no standardized evaluation framework to comprehensively evaluate its impact. Our objectives were to list the criteria used in published evaluations of noninvasive HF telemonitoring projects, describe how they are used in the evaluation studies, and organize them into a consistent scheme. Articles published from January 1990 to August 2015 were obtained through MEDLINE, Web of Science, and EMBASE. Articles were eligible if they were original reports of a noninvasive HF telemonitoring evaluation study in the English language. Studies of implantable telemonitoring devices were excluded. Each selected article was screened to extract the description of the telemonitoring project and the evaluation process and criteria. A qualitative synthesis was performed. We identified and reviewed 128 articles leading to 52 evaluation criteria classified into 6 dimensions: clinical, economic, user perspective, educational, organizational, and technical. The clinical and economic impacts were evaluated in more than 70% of studies, whereas the educational, organizational, and technical impacts were studied in fewer than 15%. User perspective was the most frequently covered dimension in the development phase of telemonitoring projects, whereas clinical and economic impacts were the focus of later phases. Telemonitoring evaluation frameworks should cover all 6 dimensions appropriately distributed along the telemonitoring project lifecycle. Our next goal is to build such a comprehensive evaluation framework for telemonitoring and test it on an ongoing noninvasive HF telemonitoring project. ©Troskah Farnia, Marie-Christine Jaulent, Olivier Steichen. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 16.01.2018.

  17. Pure Dead Brilliant?: Evaluating the Glasgow Story Digitisation Project

    ERIC Educational Resources Information Center

    Anderson, Ian G.

    2007-01-01

    Purpose: The purpose of this paper is to present an evaluation of The Glasgow Story (TGS) digitisation project, funded by the UK's National Lottery's New Opportunities Fund digitisation (NOF-Digi) programme, and a critique of the evaluation process itself. The paper emphasises the need for user impact evaluation and for results to be brought into…

  18. Defining the Scope of Your Evaluation

    ERIC Educational Resources Information Center

    Wood, Elizabeth

    2015-01-01

    One challenge of conducting evaluations is finding the right questions to guide the work. A clear purpose for a study gives the evaluator a good sense of what information can answer the questions, and helps frame the scope of the project as a whole. Knowing the scope of the evaluation project provides a sense of the resources needed. A common…

  19. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    NASA Astrophysics Data System (ADS)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  20. "India Population Projects" in Karnataka.

    PubMed

    Reddy, P H; Badari, V S

    1991-12-01

    An overview, objectives, implementation, and research and evaluation studies of 2 India Population Projects in Karnataka are presented. The India Population Project I (IPP-I) was conducted in Karnataka and Uttar Pradesh. India Population Project III (IPP-III) took place between 1984-92 in 6 districts of Karnataka: Belgaum, Bijapur, Dharwad, Bidar, Gulbarga, and Raichur, and 4 districts in Kerala. The 6 districts in Karnataka accounted for 36% (13.2 million) of the total national population. The project cost was Rs. 713.1 million which was shared by the World Bank, and the Indian national and regional government. Due to poor past performance, these projects were undertaken to improve health and family welfare status. Specific project objectives are outlined. IPP-I included an urban component, and optimal Government of India program, and an intensive rural initiative. The urban program aimed to improved pre- and postnatal services and facilities, and the family planning (FP) in Bangalore city. The rural program was primarily to provide auxiliary nurse-midwives and hospitals and clinics, and also supplemental feeding program for pregnant and nursing mothers and children up to 2 years. The government program provided FP staff and facilities. IPP-I had 3 units to oversee building construction, to recruit staff and provide supplies and equipment, and to establish a Population Center. IPP-III was concerned with service delivery; information, education, and communication efforts (IEC) and population education; research and evaluation; and project management. Both projects contributed significantly to improving the infrastructure. A brief account of the types and kinds of studies undertaken is given. Studies were grouped into longitudinal studies of fertility, mortality, and FP; management information and evaluation systems for health and family welfare programs; experimental strategies; and other studies. Research and evaluation studies in IPP-III encompassed studies in gaps in knowledge, skills, and practice of health and FP personnel; baseline and endline surveys; and operational evaluation of the management information and evaluation system; factors affecting primary health care in Gulbarga district; evaluation of radio health lessons and the impact of the Kalyana Matha Program; and studies of vaccination and child survival and maternal mortality. Training programs were also undertaken.

  1. Averaged ratio between complementary profiles for evaluating shape distortions of map projections and spherical hierarchical tessellations

    NASA Astrophysics Data System (ADS)

    Yan, Jin; Song, Xiao; Gong, Guanghong

    2016-02-01

    We describe a metric named averaged ratio between complementary profiles to represent the distortion of map projections, and the shape regularity of spherical cells derived from map projections or non-map-projection methods. The properties and statistical characteristics of our metric are investigated. Our metric (1) is a variable of numerical equivalence to both scale component and angular deformation component of Tissot indicatrix, and avoids the invalidation when using Tissot indicatrix and derived differential calculus for evaluating non-map-projection based tessellations where mathematical formulae do not exist (e.g., direct spherical subdivisions), (2) exhibits simplicity (neither differential nor integral calculus) and uniformity in the form of calculations, (3) requires low computational cost, while maintaining high correlation with the results of differential calculus, (4) is a quasi-invariant under rotations, and (5) reflects the distortions of map projections, distortion of spherical cells, and the associated distortions of texels. As an indicator of quantitative evaluation, we investigated typical spherical tessellation methods, some variants of tessellation methods, and map projections. The tessellation methods we evaluated are based on map projections or direct spherical subdivisions. The evaluation involves commonly used Platonic polyhedrons, Catalan polyhedrons, etc. Quantitative analyses based on our metric of shape regularity and an essential metric of area uniformity implied that (1) Uniform Spherical Grids and its variant show good qualities in both area uniformity and shape regularity, and (2) Crusta, Unicube map, and a variant of Unicube map exhibit fairly acceptable degrees of area uniformity and shape regularity.

  2. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume II. Project marketing/economic/financial/ and organization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The results of marketing, economic, and financial studies are reported in this volume.« less

  3. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  4. Evaluation Project of a Postvention Program.

    ERIC Educational Resources Information Center

    Simon, Robert; And Others

    A student suicide or parasuicide increases the risk that potentially suicidal teenagers see suicide as an enviable option. The "copycat effect" can be reduced by a postvention program. This proposed evaluative research project will provide an implementation and impact evaluation of a school's postvention program following a suicide or…

  5. Dipping Your Toes into Evaluation in Five Easy Steps: Tips, Tricks, and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Martin, A. M.

    2013-04-01

    With limited funding, staffing, and resources for STEM education projects, the push for rigorous evaluation of our efforts offers up significant challenges, but opportunities as well. Evaluative thinking can enrich and improve the entire life cycle of an education, communication, or outreach project, and can take many forms other than a final, summative evaluation report. The community of attendees at the Astronomical Society of the Pacific will share an abundance of evaluation expertise, approaches, and results, but where does one turn if evaluation is a new concept or responsibility? This session will briefly highlight five tips, tricks, and lessons learned from the perspective of a novice and from a NASA project new to evaluation. The resources and ideas shared in the session will represent the concrete advice and driving ideas that put the author on firmer evaluative footing. Themes explored will include: (1) strategies for incorporating evaluative thinking early in the development of a project and throughout its life cycle; (2) the benefit of taking the time to elucidate a program's logic model of theory of action; (3) linking program activities to outcomes that are SMART (specific, measurable, attainable, relevant, and timely); (4) working with an external or internal evaluator; and (5) taking evaluation beyond the formal, final report. Finally, we'll close with resources to help individuals and their organizations learn more about evaluation and build their evaluation capacity.

  6. Evaluation of the California Community Colleges' Vocational Education Special Projects 1988-89 and 1989-90. Final Report on Special Project 90-0406, August 28, 1991-May 31, 1992.

    ERIC Educational Resources Information Center

    Evaluation and Training Inst., Los Angeles, CA.

    In 1991-92, a study was conducted to refine and implement a system for evaluating the California Community Colleges' vocational education special projects funded under the Carl D. Perkins Vocational Education Act of 1984. The study focused on the 110 projects funded in 1988-89 and 1989-90, assessing their achievement of federal and state goals.…

  7. ISeeYou - Evaluation of a woman-centred care pilot project in Bachelor midwifery education and research.

    PubMed

    Fontein-Kuipers, Yvonne; Romeijn, Enja

    2018-03-01

    to evaluate the ISeeYou project that aims to equip first year Bachelor midwifery students to support them in their learning of providing woman-centred care. the project has an ethnographic design. First year midwifery students buddied up to one woman throughout her continuum of the childbirth process and accompanied her during her antenatal and postnatal care encounters. Participant-observation was utilised by the students to support their learning. The Client Centred Care Questionnaire (CCCQ) was administered to collect data about women's care experiences. The project was evaluated using the SWOT model. 54 first year students completed the project and observed and evaluated on average eight prenatal visits and two postnatal visits. Students gained insight into women's lived experiences during the childbirth process and of received care throughout this period. Students reported that this was meaningful and supported and enhanced their comprehension of women-centred care. Logistic issues (lectures, travel, time) and being conscious of their role as an 'outsider' sometimes constrained, but never hindered, the students in meeting the requirements of the project. Overall, the project provided students with opportunities to expand competencies and to broaden their outlook on midwifery care. the project offers students unique and in-depth experiences supporting and augmenting their professional competencies and their personal, professional and academic development. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. [Analysis of evaluation process of research projects submitted to the Fondo de Investigación Sanitaria, Spain].

    PubMed

    Prieto Carles, C; Gómez-Gerique, J; Gutiérrez Millet, V; Veiga de Cabo, J; Sanz Martul, E; Mendoza Hernández, J L

    2000-10-07

    At the present time it seems very clear that research improvement is both an unquestionable fact and the right way to develop technological innovation, services and patents. However, such improvement and corresponding finances needs to be done under fine and rigorous evaluation process as an assessment tool under which all the research projects applying to a public or private call for proposals should be submitted to assure a coherence point according to the investment to be made. At this end, the main target of this work has been focused to analysis and study the evaluation process traditionally made by Fondo de Investigación Sanitaria (FIS) as well as to propose most adequate modifications. A sample of 431 research projects corresponding to year 1998 proposal was analysed. The evaluation from FIS and ANEP (National Evaluation and Prospective Agency) was evaluated and scored (evaluation quality) in its main contents by 3 independent evaluators, the showed results submitted to a comparative frame between these agencies at indoor (FIS) and outdoor (FIS/ANEP) level. FIS evaluation had 20 commissions or areas of knowledge. The analysis indoor (FIS) clearly showed that evaluation quality was correlated to the assigned commission (F = 3.71; p < 0.001) and to the time last of the researched proposal (F = 3.42; p < 0.05) but no related to the evaluator. On the other hand, the quality of ANEP evaluation showed a correlated dependency of the three mentioned facts. In all terms, the ANEP evaluation was better than FIS for the three years time projects, but in did not show significant differences in one or two years time projects. In all cases, the evaluation with final results as negative (financing denied) showed an average quality higher than positive evaluation. The obtained results advice about the convenience of making some changes in the evaluative structure and to review the sort of FIS technical commissions focusing an improvement of the evaluation process.

  9. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Taos, NM, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Town of Taos in New Mexico. The main objective of the project was to evaluate the effectiveness of Severn Trent Services’ (STS) SORB 33™ ad...

  10. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Richmond Elementary School in Susanville, CA Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Richmond Elementary School in Susanville, CA. The objectives of the project were to evaluate: (1) the effectiveness of an Aquatic Treatme...

  11. NASA's F-15B testbed aircraft in flight during the first evaluation flight of the joint NASA/Gulfstream Quiet Spike project

    NASA Image and Video Library

    2006-08-10

    NASA's F-15B testbed aircraft in flight during the first evaluation flight of the joint NASA/Gulfstream Quiet Spike project. The project seeks to verify the structural integrity of the multi-segmented, articulating spike attachment designed to reduce and control a sonic boom.

  12. Local police enforcement, public information and education strategies to foster more and proper use of child safety seats by toddlers : evaluation of a demonstration project

    DOT National Transportation Integrated Search

    1994-03-01

    This project evaluated the effects of enforcing safety belt (SB)/child safety seat (CSS) laws and providing public information and education (PI&E) about the laws and use and proper use of CSSs--without external funding. Project goals focused on incr...

  13. Fairfax Alcohol Safety Action Project second year evaluation summary : a report prepared by the Virginia Highway and Transportation Research Council under the sponsorship of the Highway Safety Division of Virginia.

    DOT National Transportation Integrated Search

    1974-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was begun in January 1972 as one of thirty-five federally funded demonstration projects designed to implement and evaluate a comprehensive community alcohol countermeasures program. The Fairfax ASAP wa...

  14. EVALUATION OF THE EOA REMEDIAL INSTRUCTION PROJECT FOR HIGH SCHOOL DROPOUTS--1966-67. RESEARCH REPORT.

    ERIC Educational Resources Information Center

    HAKKARAINEN, EDWARD A.

    A REMEDIAL READING INSTRUCTION PROJECT TO IMPROVE THE SKILLS OF HIGH SCHOOL DROPOUTS IS EVALUATED. CENTERS WERE ESTABLISHED AT THREE SITES TO SERVE 750 DROPOUTS REFERRED BY VARIOUS COMMUNITY AGENCIES. THE PROJECT WAS STAFFED BY SIX REMEDIAL READING TEACHERS, SEVEN COMMUNITY AIDES, AND ONE LIAISON WORKER. INDIVIDUALIZED INSTRUCTION USING A VARIETY…

  15. A Third Party Evaluation of the Appalachian Maryland Experience-Based Career Education Project: 1976-77.

    ERIC Educational Resources Information Center

    Stead, Floyd L.; And Others

    A third party evaluation was conducted of the first phase, 1976-77, of the three-year Appalachian Maryland Experienced Based Career Education Project (EBCE). During this year, the project provided combined learning activities outside and within the classroom for twenty-four twelfth grade students. These experimental students and twenty-three…

  16. Challenges and Realities: Evaluating a School-Based Service Project.

    ERIC Educational Resources Information Center

    Keir, Scott S.; Millea, Susan

    The Hogg Foundation for Mental Health created the School of the Future (SoF) project to enable selected Texas schools to coordinate and implement school-based social and health services on their campuses and to demonstrate the effectiveness of this method of service delivery by evaluating the project to show the process used and the outcomes that…

  17. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Hot Springs Mobile Home Park in Willard, Utah - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents activities performed for and results obtained from the arsenic removal treatment technology demonstration project at the Hot Springs Mobile Home Park (HSMHP) in Willard, UT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™...

  18. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Queen Anne’s County, Maryland Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the community of Prospect Bay at Grasonville in Queen Anne’s County, MD. The main objective of the project was to evaluate the effective...

  19. Arsenic Removal from Drinking Water by Iron Removal and Adsorptive Media U.S. EPA Demonstration Project at Stewart, MN, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the one-year U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project was to evaluate the effectiveness ...

  20. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Wellman, TX, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project in the City of Wellman, TX. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in remo...

  1. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Webb Consolidated Independent School District in Bruni, TX - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) in Bruni, TX. The main objective of the project was to evaluate the effect...

  2. Arsenic Removal from Drinking Water by Adsorptive Media EPA Demonstration Project at Golden Hills Community Services District in Tehachapi, CA Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Golden Hills Community Services District (GHCSD) located in Tehachapi, CA. The objectives of the project were to evaluate (1) the effecti...

  3. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Nambe Pueblo, New Mexico - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from this arsenic removal treatment technology demonstration project at the Nambe Pueblo, New Mexico. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies' AD-33 media i...

  4. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Village of Pentwater, MI. Final performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the Village of Pentwater, MI facility. The objectives of the project were to evaluate: (1) the effectiveness of Kinetico’s FM-260...

  5. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Town of Felton, DE, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the Town of Felton, DE. The objectives of the project were to evaluate: (1) the effectiveness of Kinetico’s FM-348-AS coagulation...

  6. Arsenic Removal from Drinking Water by Coagulation/Filtration, U.S. EPA Demonstration Project at the City of Okanogan, WA - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the City of Okanogan, WA facility. The objectives of the project were to evaluate: (1) the effectiveness of Filtronics’ FH-13 Ele...

  7. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at City of Three Forks, MT, Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the City of Three Forks, MT facility. The objectives of the project were to evaluate: 1) the effectiveness of Kinetico’s FM-248-A...

  8. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI. Six-Month Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project are to evaluate 1) the effectiveness of Siemen...

  9. Peer Evaluation in Blended Team Project-Based Learning: What Do Students Find Important?

    ERIC Educational Resources Information Center

    Lee, Hye-Jung; Lim, Cheolil

    2012-01-01

    Team project-based learning is reputed to be an appropriate way to activate interactions among students and to encourage knowledge building through collaborative learning. Peer evaluation is an effective way for each student to participate actively in a team project. This article investigates the issues that are important to students when…

  10. Metrics, The Measure of Your Future: Evaluation Report, 1977.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Development.

    The primary goal of the Metric Education Project was the systematic development of a replicable educational model to facilitate the system-wide conversion to the metric system during the next five to ten years. This document is an evaluation of that project. Three sets of statistical evidence exist to support the fact that the project has been…

  11. North Carolina Migrant Education Program. 1971 Project Evaluation Reports, Vol. I.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    Evaluation reports for 10 of the 23 1971 Summer Migrant Projects in North Carolina are presented in Volume I of this compilation. Each report contains the following information: (1) descriptive statistics and results of student achievement; (2) description of the project as obtained from site team reports and other available information; and (3)…

  12. Evaluation of Supported Placements in Integrated Community Environments Project (SPICE). Final Report.

    ERIC Educational Resources Information Center

    Wilson, Leslie; And Others

    This evaluation project was designed to assess 37 persons (ages 21-72) who had moved from intermediate care facilities or skilled nursing facilities into innovative one-person or two-person community integrated living arrangements as a result of the Supported Placements in Integrated Community Environments project. The 37 persons had severe or…

  13. Distributed Leadership as a Factor in and Outcome of Teacher Action Learning

    ERIC Educational Resources Information Center

    Dinham, Stephen; Aubusson, Peter; Brady, Laurie

    2008-01-01

    This paper reports an evaluation of Quality Teaching Action Learning (QTAL) projects conducted at New South Wales (NSW), Australia public (state) primary and secondary schools and explores how distributed leadership facilitated and was an outcome of the QTAL projects. The evaluation encompassed all 50 projects at 82 NSW public schools, and nine of…

  14. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Woodstock Middle School in Woodstock, CT - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Woodstock Middle School in Woodstock, CT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™ me...

  15. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Wellman, TX, Six-Month Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project in the City of Wellman, TX. The main objective of the project was to evaluate the effectiveness of AdEdge Technolog...

  16. Computer Writing Skills for Limited English Proficiency Students: Project COMPUGRAFIA.LEP 1988-89. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Keyes, Jose L.

    The Computer Writing Skills for Limited English Proficient Students (Project COMPUGRAFIA.LEP), bilingual special education classes totalling 375 Spanish-speaking students at 10 elementary schools in the Bronx, is evaluated. The project proposed to assist site teachers in developing appropriate lesson plans and effective teaching techniques and…

  17. Choosing Optional Career Education. Project Choice 1988-89. OREA Report. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Plotkin, Donna

    This report evaluates the implementation and outcome of the Elementary and Secondary Education Act Title VII program, Choosing Optional Infused Career Education (Project CHOICE) in Springfield Gardens High School in Queens (New York) and Fort Hamilton High School in Brooklyn (New York) for the 1988-89 school year. The project was created to combat…

  18. Follow-Through Project, Health-Education-Welfare Fund (Fund Number 88-1). 1971-1972 Evaluation.

    ERIC Educational Resources Information Center

    Halasa, Ofelia; Fleming, Margaret

    The 1971-72 evaluation report of Project Follow Through in the Cleveland public schools focuses on the following issues: (1) degree to which product objectives at each grade level were attained, (2) degree to which such factors as project participation, teacher, preschool experience, and socio-economic factors influenced children's performance,…

  19. William H. Taft High School Project HOLA 1983-1984. O.E.A. Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This report evaluates Project HOLA, in its first year of funding, which provides instruction in English as a second language, Spanish language skills, and bilingual instruction in mathematics, science, and social studies to approximately 230 students in a high school in Bronx, New York. The report examines the project's long- and short-range…

  20. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    ERIC Educational Resources Information Center

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…

  1. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Seely-Brown Village in Pomfret, CT - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at Seely-Brown Village in Pomfret, CT. The objectives of the project were to evaluate the effectiveness of ArsenXnp adsorption media in...

  2. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Northeastern Elementary School in Fountain City, IN - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Northeastern Elementary School in Fountain City, IN. The main objective of the project was to evaluate the effectiveness of US Water Sys...

  3. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Geneseo Hills Subdivision, in Geneseo, IL Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Geneseo Hills Subdivision in Geneseo, IL. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies...

  4. The Boeing Company Applied Academics Project Evaluation: Year Four. Evaluation Report.

    ERIC Educational Resources Information Center

    Wang, Changhua; Owens, Thomas R.

    This paper describes fourth-year outcomes (1993-94) of the Boeing Company-funded Applied Academics Project. Since the 1990-91 school year, the company has provided funds to improve and expand applied academics in 60 Washington high schools. Data were collected from pre- and post-surveys of students enrolled in the project's Applied Mathematics…

  5. National Evaluation of the Even Start Family Literacy Program: Report on Migrant Even Start Projects.

    ERIC Educational Resources Information Center

    Levin, Marjorie; Gamse, Beth; Swartz, Janet; Tao, Fumiyo; Tarr, Hope

    In fall 1994, 14 state Migrant Education Programs were receiving direct federal grants to administer Migrant Even Start projects. These projects provide migrant families with an integrated program of early childhood education, adult education, and parenting education. As part of the national evaluation of the Even Start Family Literacy Program,…

  6. Chinese Opportunities in Career Education (Project CHOICE). 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Chinese Opportunities in Career Education Program (Project CHOICE), which served economically disadvantaged Chinese American high school students of limited English proficiency. The project operated at two Manhattan high schools and served 523 students, of whom 94.6 percent were eligible for…

  7. Some Effects of Schooling: A Three Year Follow-Up of a Title III Project.

    ERIC Educational Resources Information Center

    Barclay, James R.; And Others

    This paper presents an evaluation of a 3-year Title III project carried out in the Vigo County School Cooperation, Terre Haute, Indiana. The project involved the evaluation of three differing instructional methodologies utilized in three elementary schools which also differed in the socioeconomic background of the students. The Dixie Bee school,…

  8. A Study on Evaluation of the Biology Projects Submitted to the TUBITAK Secondary Education Research Projects Contest from the Bursa Region

    ERIC Educational Resources Information Center

    Zeren Özer, Dilek; Güngör, Sema Nur; Özkan, Muhlis

    2015-01-01

    This study evaluates, through the employment of scientific methods and techniques, a total of 107 Biology projects submitted by secondary education students to the Bursa Region Coordinatorship of TUBITAK (a region which encompasses the municipalities of Afyonkarahisar, Balikesir, Bilecik, Canakkale, Eskisehir, Kutahya, and Yalova). The projects…

  9. Evaluation of the Teenage Pregnancy and Parenting (TAPP) Project, October 1, 1982-September 30, 1983.

    ERIC Educational Resources Information Center

    San Francisco Family Service Agency, CA.

    This report describes and evaluates the second year (1982-83) of the Teenage Pregnancy and Parenting Project (TAPP) of San Francisco. The goals of this project, described in an introductory summary, are to improve maternal and child health, increase school enrollment for pregnant teenagers, increase the involvement of young fathers with their…

  10. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Alvin, TX, Six-Month Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Oak Manor Municipal Utility District (MUD) facility at Alvin, TX. The main objective of the project is to evaluate...

  11. Arsenic Removal from Drinking Water by Adsorptive Media, U.S. EPA Demonstration Project at LEADS Head Start Building in Buckeye Lake, OH - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Licking Economic Action Development Study (LEADS) Head Start School in Buckeye Lake, Ohio. The objectives of the project were to evaluate...

  12. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL AND ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT STEWART, MN. SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project is to evaluate the effectiveness of Siemens¿ Type II AERALA...

  13. Arsenic Removal from Drinking Water by Iron Removal. U.S. EPA Demonstration Project at Sabin, MN. Six-Month Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Sabin, MN. The main objective of the project is to evaluate the effectiveness of the Kinetico FM-248-AS ars...

  14. ATIS evaluation framework

    DOT National Transportation Integrated Search

    2005-04-01

    This report documents the results of a series of ITS project evaluations performed for the Washington State Department of Transportation (WSDOT). Five Washington state advanced traveler information system (ATIS) projects selected for federal ITS fund...

  15. A model for evaluating the sustainability of community-directed treatment with ivermectin in the African Program for Onchocerciasis Control.

    PubMed

    Okeibunor, Joseph; Bump, Jesse; Zouré, Honorat G M; Sékétéli, Azodoga; Godin, Christine; Amazigo, Uche V

    2012-01-01

    Onchocerciasis is controlled by mass treatment of at-risk populations with ivermectin. Ivermectin is delivered through community-directed treatment (CDTI) approach. A model has been developed to evaluate the sustainability of the approach and has been tested at 35 projects in 10 countries of the African Program for Onchocerciasis Control (APOC). It incorporates quantitative and qualitative data collection and analysis, taking account of two factors identified as crucial to project sustainability. These are (i) the provision of project performance information to partners, and (ii) evidence-based support for project implementation. The model is designed to provide critical indicators of project performance of the model to implementing, coordinating, and funding partners. The model's participatory and flexible nature makes it culturally sensitive and usable by project management. This model is able to analyze the different levels involved in project implementation and arrive at a judgment for the whole project. It has inbuilt mechanisms for ensuring data reliability and validity. The model addresses the complex issue of sustainability with a cross-sectional design focusing on how and at which operational level of implementation to strengthen a CDTI project. The unique attributes and limitations of the model for evaluating the sustainability of projects were described. Copyright © 2012 John Wiley & Sons, Ltd.

  16. Application of life cycle assessment for an evaluation of wastewater treatment and reuse project--case study of Xi'an, China.

    PubMed

    Zhang, Q H; Wang, X C; Xiong, J Q; Chen, R; Cao, B

    2010-03-01

    In order to illuminate the benefit of a wastewater treatment and reuse project, a life cycle assessment (LCA) model was proposed by combining the process-based LCA and the input-output based LCA in one framework and using energy consumption as the sole parameter for quantitative evaluation of the project. The life cycle consumption was evaluated mainly by life cycle inventory (LCI) analysis taking into account the construction phase, operation phase and demolishment phase of the project. For evaluating the life cycle benefit of treated water reuse, attention was paid to the decrease of secondary effluent discharge and water saving. As a result of comprehensive LCA analysis of a case project in Xi'an, China, it was understood that the life cycle benefit gained from treated wastewater reuse much surpassed the life cycle energy consumption. The advantage of wastewater treatment and reuse was well shown by LCA analysis using the proposed model. 2009 Elsevier Ltd. All rights reserved.

  17. A GIS-based approach for the screening assessment of noise and vibration impacts from transit projects.

    PubMed

    Hamed, Maged; Effat, Waleed

    2007-08-01

    Urban transportation projects are essential in increasing the efficiency of moving people and goods within a city, and between cities. Environmental impacts from such projects must be evaluated and mitigated, as applicable. Spatial modeling is a valuable tool for quantifying the potential level of environmental consequences within the context of an environmental impact assessment (EIA) study. This paper presents a GIS-based tool for the assessment of airborne-noise and ground-borne vibration from public transit systems, and its application to an actual project. The tool is based on the US Federal Transit Administration's (FTA) approach, and incorporates spatial information, satellite imaging, geostatistical modeling, and software programming. The tool is applied on a case study of initial environmental evaluation of a light rail transit project in an urban city in the Middle East, to evaluate alternative layouts. The tool readily allowed the alternative evaluation and the results were used as input to a multi-criteria analytic framework.

  18. Restoration of riparian vegetation: A global review of implementation and evaluation approaches in the international, peer-reviewed literature.

    PubMed

    González, Eduardo; Sher, Anna A; Tabacchi, Eric; Masip, Adrià; Poulin, Monique

    2015-08-01

    We examined how restoration of riparian vegetation has been implemented and evaluated in the scientific literature during the past 25 years. A total of 169 papers were read systematically to extract information about the following: 1) restoration strategies applied, 2) scale of monitoring and use of reference sites, 3) metrics used for evaluation, and 4) drivers of success. Hydro-geomorphic approaches (e.g., dam operations, controlled floods, landform reconfiguration) were the most frequent, followed by active plant introduction, exotic species control, natural floodplain conversion and grazing and herbivory control. Our review revealed noteworthy limitations in the spatio-temporal approaches chosen for evaluation. Evaluations were mostly from one single project and frequently ignored the multi-dimensional nature of rivers: landscape spatial patterns were rarely assessed, and most projects were assessed locally (i.e., ≤meander scale). Monitoring rarely lasted for more than six years and the projects evaluated were usually not more than six years old. The impact of the restoration was most often (43%) assessed by tracking change over time rather than by comparing restored sites to unrestored and reference sites (12%), and few projects (30%) did both. Among the ways which restoration success was evaluated, vegetation structure (e.g., abundance, density, etc.) was assessed more often (152 papers) than vegetation processes (e.g., biomass accumulation, survival, etc.) (112 papers) and vegetation diversity (78 papers). Success was attributed to hydro-geomorphic factors in 63% of the projects. Future evaluations would benefit from incorporating emerging concepts in ecology such as functional traits to assess recovery of functionality, more rigorous experimental designs, enhanced comparisons among projects, longer term monitoring and reporting failure. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Southern California Priority Corridor Showcase Program evaluation : Corridor-wide Rideshare Data Exchange Project evaluation report

    DOT National Transportation Integrated Search

    2004-11-01

    As required by federal law, all Intelligent Transportation System (ITS) projects that : receive federal funding must undergo an evaluation to help assess the costs and benefits : of ITS. This document is one of 23 reports produced as part of the Sout...

  20. Documenting Progress and Demonstrating Results: Evaluating Local Out-of-School Time Programs.

    ERIC Educational Resources Information Center

    Little, Priscilla; DuPree, Sharon; Deich, Sharon

    A collaborative publication between Harvard Family Research Project and The Finance Project, this brief offers guidance in documenting progress and demonstrating results in local out-of-school-time programs. Following introductory remarks providing a rationale for program evaluation, discussing principles of program evaluation, and clarifying key…

  1. Project Developmental Continuity Evaluation: Site Visitors' Manual.

    ERIC Educational Resources Information Center

    Morris, Mary; Smith, Allen

    This site visitors' manual is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. The PDC evaluation documents and analyzes the process of program…

  2. Phase III (final) evaluation report : national evaluation of the FY01 earmark, area transportation authority of North Central Pennsylvania--regional GIS/ITS initiative.

    DOT National Transportation Integrated Search

    2009-08-31

    This report presents the results of the United States Department of Transportation evaluation of a federally funded earmark project implemented by the Area Transportation Authority of North Central Pennsylvania (ATA). The project implemented a suite ...

  3. Participatory Evaluation with Youth Leads to Community Action Project

    ERIC Educational Resources Information Center

    Ashton, Carolyn; Arnold, Mary E.; Wells, Elissa E.

    2010-01-01

    4-H has long emphasized the importance of civic engagement and community service for positive youth development. One pathway to this ideal is youth action research and evaluation. This article demonstrates how participatory youth research and evaluation can lead to the successful implementation of community action projects. It describes the…

  4. Final Evaluation for the Neighborhood Educational Cultural Centerette.

    ERIC Educational Resources Information Center

    Frost, Patricia

    Contained in this report is the final evaluation for the Neighborhood Educational Cultural Centerette Project. Objectives of the research project were to: (1) investigate, experiment with, create, and evaluate methods of instruction curriculum, and materials; analyze pupil learning styles and teacher-teaching styles; and to provide staff growth…

  5. Major Factors Influencing HIV/AIDS Project Evaluation

    ERIC Educational Resources Information Center

    Niba, Mercy Bi; Green, J. Maryann

    2005-01-01

    This article aimed at finding out if participatory processes (group discussions, enactments, and others) do make a valuable contribution in communication-based project implementation/evaluation and the fight against HIV/AIDS. A case study backed by documentary analysis of evaluation reports and occasional insights from interviews stood as the main…

  6. The ASCD Healthy School Communities Project: Formative Evaluation Results

    ERIC Educational Resources Information Center

    Valois, Robert F.; Lewallen, Theresa C.; Slade, Sean; Tasco, Adriane N.

    2015-01-01

    Purpose: The purpose of this paper is to report the formative evaluation results from the Association for Supervision and Curriculum Development Healthy School Communities (HSC) pilot project. Design/methodology/approach: This study utilized 11 HSC pilot sites in the USA (eight sites) and Canada (three sites). The evaluation question was…

  7. DESIGNS FOR ESTIMATING VARIABILITY STRUCTURE AND IMPLICATIONS FOR DETECTING WATERSHED RESTORATION EFFECTIVENESS

    EPA Science Inventory

    The evaluation of stream restoration projects is moving from a focus on project specific effectiveness to a more holistic evaluation of the array of restoration activities that are or might be imposed to improve conditions across the stream network. Part of evaluating how the con...

  8. An Educational Leadership Doctoral Project: Teacher Evaluation Policies and Practices at the District Level

    ERIC Educational Resources Information Center

    Manchion, Kyrie L.; Bonsignore, Matt; Haley, Tina L.

    2012-01-01

    This report describes a project focused on quality teacher evaluation practices. Many scholars described the relationship between quality teaching and student learning. Literature suggests a connection between teaching practices and teacher evaluation practices. In addition, scholars recommend educational leaders conduct a periodic review of…

  9. Evaluation of Title I ESEA Projects, 1976-77: Technical Reports. Report #77140.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This volume compiles technical reports of Title I Elementary and Secondary Education Act project evaluations conducted during the 1976-77 academic year in the school district of Philadelphia, Pennsylvania. The reports include rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of…

  10. Evaluating Injury Prevention Programs: The Oklahoma City Smoke Alarm Project.

    ERIC Educational Resources Information Center

    Mallonee, Sue

    2000-01-01

    Illustrates how evaluating the Oklahoma City Smoke Alarm Project increased its success in reducing residential fire-related injuries and deaths. The program distributed and tested smoke alarms in residential dwellings and offered educational materials on fire prevention and safety. Evaluation provided sound data on program processes and outcomes,…

  11. Career Education Evaluation in the State of Missouri

    ERIC Educational Resources Information Center

    Lady, Robin E.; Wilhelm, Eric

    2010-01-01

    This doctoral team project focused on the state policies and procedures for evaluation of career education programs in Missouri. The project team worked with the Career Education department at the Missouri Department of Elementary and Secondary Education to investigate the current evaluation policies used. It was determined that the Career…

  12. Design and evaluation of expanded polystyrene geofoam embankments for the I-15 reconstruction project, Salt Lake City, Utah.

    DOT National Transportation Integrated Search

    2012-10-01

    The report discusses the design and 10-year performance evaluations of Expanded Polystyrene (EPS) Geofoam embankment constructed for the I-15 Reconstruction Project in Salt Lake City, Utah between 1998 and 2002. It contains methods to evaluate the al...

  13. 78 FR 27957 - Fisheries of the South Atlantic, Southeast Data, Assessment, and Review (SEDAR); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ..., describes the fisheries, evaluates the status of the stock, estimates biological benchmarks, projects future.... Participants will evaluate and recommend datasets appropriate for assessment analysis, employ assessment models to evaluate stock status, estimate population benchmarks and management criteria, and project future...

  14. A System for Evaluating Microcomputer Courseware for Vocational and Technical Education. Final Report.

    ERIC Educational Resources Information Center

    Chase, Shirley A.; And Others

    A project was conducted to design a system for evaluating microcomputer courseware for vocational and technical education. Through a literature review and contacts with organizations and individuals involved in courseware evaluation and use, project staff identified and acquired for review documents pertaining to courseware evaulation, vocational…

  15. Evaluation Of Traffic Control Devices For Rural High-Speed Maintenance Work Zones: Second Year Activities And Final Recommendations

    DOT National Transportation Integrated Search

    2000-10-01

    This report documents the second year of a two-year project to evaluate the effectiveness of innovative work zone traffic control devices. Researchers evaluated these devices at short-term rural work zones. During the second year of the project, seve...

  16. Evaluation: The TADS Experience. Occasional Paper Number 4.

    ERIC Educational Resources Information Center

    Suarez, Tanya M.; Vandiviere, Patricia

    The paper considers the issues, decisions, and practices involved in evaluating the Technical Assistance Development System (TADS), a project to provide assistance to demonstration projects and start education agency grantees in the Handicapped Children's Early Education Program. Section 1 considers the focus for the evaluation in terms of its…

  17. Advanced Public Transportation Systems. Technical Assistance Brief 2

    DOT National Transportation Integrated Search

    1993-01-01

    The Advanced Public Transportation Systems (APTS) Program requires evaluation : of pilot projects. This technical assistance brief discusses the guidelines set : for developing evaluation framework and methodology for local projects. 4p.

  18. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Treesearch

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  19. Fourth Meeting of the Panel for Evaluation of Experimental Literacy Projects. Final Report.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The work of this Panel for the Evaluation of Experimental Literacy Projects was the assessing of how the pattern of evaluation it had previously formulated had been applied in the Experimental World Literacy Programme (EWLP). In the judgment of the Panel, by 1974 evaluation specialists will be able to present a report that will enable Member…

  20. Report on Pilot Test Of Impact and In-Depth Measures. Child and Family Mental Health Project.

    ERIC Educational Resources Information Center

    Condry, Sandra; Hayes, William A.

    This document reports the pilot test of the two components of the Child and Family Mental Health (CFMH) Evaluation Project -- the impact evaluation component and the in-depth evaluation component. (The impact evaluation is designed to determine the effects of the two primary prevention models of service and activities on the CFMH Head Start…

  1. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    PubMed Central

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  2. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    PubMed

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare.

  3. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry

    PubMed Central

    2015-01-01

    Background The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. Methods ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. Results The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. Conclusions ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare. PMID:26391445

  4. Geothermal Project Consulting | Geothermal Technologies | NREL

    Science.gov Websites

    Geothermal Project Consulting Geothermal Project Consulting When consulting on projects, NREL focuses on identifying specific barriers or challenges that are likely to impact geothermal project , validation, and deployment of geothermal technologies Assess and evaluate geothermal R&D projects

  5. Software Architecture Evaluation in Global Software Development Projects

    NASA Astrophysics Data System (ADS)

    Salger, Frank

    Due to ever increasing system complexity, comprehensive methods for software architecture evaluation become more and more important. This is further stressed in global software development (GSD), where the software architecture acts as a central knowledge and coordination mechanism. However, existing methods for architecture evaluation do not take characteristics of GSD into account. In this paper we discuss what aspects are specific for architecture evaluations in GSD. Our experiences from GSD projects at Capgemini sd&m indicate, that architecture evaluations differ in how rigorously one has to assess modularization, architecturally relevant processes, knowledge transfer and process alignment. From our project experiences, we derive nine good practices, the compliance to which should be checked in architecture evaluations in GSD. As an example, we discuss how far the standard architecture evaluation method used at Capgemini sd&m already considers the GSD-specific good practices, and outline what extensions are necessary to achieve a comprehensive architecture evaluation framework for GSD.

  6. A retrospective review of required projects in systems-based practice in a single anesthesiology residency: a 10-year experience.

    PubMed

    Sakai, Tetsuro; Emerick, Trent D; Patel, Rita M

    2015-09-01

    The Accreditation Council for Graduate Medical Education has emphasized in its core competencies and more recently, in its Milestones Project, that residents understand the importance of systems-based practice (SBP). The objectives of the study are to evaluate the quality of residents' SBP projects and to determine the degrees that were subsequently implemented. A retrospective educational observational study. A university-based anesthesiology training institution. One hundred forty-nine anesthesiology residents in their final (postgraduate year 4) year of training who completed SBP projects for the last 10 years (2004-2013). A structured SBP course was provided for postgraduate year 4 anesthesiology residents with deadlines set such as project identification, data collection, and proposal draft. Each resident's written SBP proposal received inputs by 2 members of the department executive steering committee. The SBP projects concluded with oral presentations by each resident to the department executive steering committee, who provided overall scores. All SBP projects were categorized into 7 categories: safety initiatives, economic analysis, process analysis, policy change recommendations, education initiatives, teamwork/communication, and operating room efficiency. Evaluation scores using a Likert scale (1-9, where 9 is the best) were analyzed. The rate of implementation of project ideas within the department based on the presentations to the executive committee was examined. Of 149 projects, policy change recommendations was the most frequently chosen category (46 projects; 30.9%), followed by process analysis (36 projects; 24.2%). The overall evaluation score was 7.6 ± 0.6 (mean ± SD). A total of 53 projects (35.6%) were implemented in the department. There was no statistical difference between SBPs with implementation vs SBPs without implementation in terms of evaluation scores, year of the presentation, or categories. This SBP project has given residents the opportunity to participate in a hospital system change aiming to improve efficiency and safety. Copyright © 2015 Elsevier Inc. All rights reserved.

  7. The management and design of economic development projects: A case study of World Bank electricity projects in Egypt

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    El Sabaa, S.M.

    1992-01-01

    This study is concerned with the efficiency of World Bank projects in Egypt. The study seeks improvements in the methods of evaluating public sector projects in Egypt. To approaches are employed: (1) project identification to optimally allocate Egypt's and World Bank's resources; (2) project appraisal to assess the economic viability and efficiency of investments. The electricity sector is compared with the agriculture sector as a means of employing project identification for priority ordering of investment for development in Egypt. The key criteria for evaluation are the impacts of developments of each sector upon Egypt's national objectives and needs. These includemore » employment opportunities, growth, alleviation of poverty, cross comparison of per capita consumption in each sector, economic rate of return, national security, balance of payments and foreign debt. The allocation of scarce investments would have been more efficient in agriculture than in electricity in meeting Egypt's national objectives and needs. World Bank lending programs in Egypt reveal a priority ordering of electricity over agriculture and rural development. World Bank development projects in Egypt have not been optimally identified, and its programs have not followed an efficient allocation of World Bank's and Egypt's resources. The key parameters in evaluating economic viability and efficiency of development projects are: (1) the discount rate (the opportunity cost of public funds); (2) the exchange rate; and (3) the cost of major inputs, as approximated by shadow prices of labor, water, electricity, and transportation for development projects. Alternative approaches to estimating the opportunity cost of public funds are made. The parameters in evaluating the efficiency of projects have not been accurately estimated in the appraisal stage of the World Bank projects in Egypt, resulting in false or misleading information concerning the economic viability and efficiency of the projects.« less

  8. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Hanchen, E-mail: jhc13@mails.tsinghua.edu.cn; Qiang, Maoshan, E-mail: qiangms@tsinghua.edu.cn; Lin, Peng, E-mail: celinpe@mail.tsinghua.edu.cn

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework usesmore » web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework. • We revealed spatial-temporal patterns of post intensity and sentiment polarity on the TGP. • We drew implications for a more in-depth understanding of the public opinion on large infrastructure projects.« less

  9. An impact evaluation of underage drinking prevention projects

    DOT National Transportation Integrated Search

    2004-03-01

    This report presents the results of an impact evaluation of four community-based underage drinking prevention projects stimulated by technical assistance coordinated by the National Association of Governor's Highway Safety Representatives (now called...

  10. Compendium of traffic safety research projects : 1987-1997

    DOT National Transportation Integrated Search

    1997-09-01

    The National Highway Traffic Safety Administration's (NHTSA) Research and Evaluation Division, Office of Research and Traffic Records, conducts research and evaluation projects dealing with human attitudes, behaviors, and failures (motor vehicle cras...

  11. Evaluation and Verification of Decadal Predictions using the MiKlip Central Evaluation System - a Case Study using the MiKlip Prototype Model Data

    NASA Astrophysics Data System (ADS)

    Illing, Sebastian; Schuster, Mareike; Kadow, Christopher; Kröner, Igor; Richling, Andy; Grieger, Jens; Kruschke, Tim; Lang, Benjamin; Redl, Robert; Schartner, Thomas; Cubasch, Ulrich

    2016-04-01

    MiKlip is project for medium-term climate prediction funded by the Federal Ministry of Education and Research in Germany (BMBF) and aims to create a model system that is able provide reliable decadal climate forecasts. During the first project phase of MiKlip the sub-project INTEGRATION located at Freie Universität Berlin developed a framework for scientific infrastructures (FREVA). More information about FREVA can be found in EGU2016-13060. An instance of this framework is used as Central Evaluation System (CES) during the MiKlip project. Throughout the first project phase various sub-projects developed over 25 analysis tools - so called plugins - for the CES. The main focus of these plugins is on the evaluation and verification of decadal climate prediction data, but most plugins are not limited to this scope. They target a wide range of scientific questions. Starting from preprocessing tools like the "LeadtimeSelector", which creates lead-time dependent time-series from decadal hindcast sets, over tracking tools like the "Zykpak" plugin, which can objectively locate and track mid-latitude cyclones, to plugins like "MurCSS" or "SPECS", which calculate deterministic and probabilistic skill metrics. We also integrated some analyses from Model Evaluation Tools (MET), which was developed at NCAR. We will show the theoretical background, technical implementation strategies, and some interesting results of the evaluation of the MiKlip Prototype decadal prediction system for a selected set of these tools.

  12. Evaluation of a novel waste heat recovery system for the cement industry using multi-criteria analysis (MCA) approach

    NASA Astrophysics Data System (ADS)

    Han, Yue; Guo, Junshan; Zheng, Wei; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2017-12-01

    Based on a novel waste heat recovery project established in a cement plant, this paper aims to evaluate the performance of the project using multi-criteria analysis (MCA) approach. Economic, environmental, social, and technical perspectives were concerned and analyzed. Different sustainability criteria and indicators related with the project were evaluated through ranking/rating process and pairwise comparison. Results have shown similar outcomes, that ten out of eleven criteria are favorable at a high standard, which reveals the project’s success. Although the project has performed so well in economic, environmental and technical terms, social aspects have some weak points, and measures should be taken to improve social benefit.

  13. NASA applications project in Miami County, Indiana

    NASA Technical Reports Server (NTRS)

    Johannsen, Chris J.; Fernandez, R. Norberto; Lozano-Garcia, D. Fabian

    1990-01-01

    This project was designed to acquaint county government officials and their clientele with remote sensing and geographic information systems (GIS) products that contain information about land conditions and land use. The specific project objectives are: (1) to investigate the feasibility of using remotely sensed data to identify and quantify specific land cover categories and conditions for purposes of tax assessment, cropland area measurements, and land use evaluation; (2) to evaluate the use of remotely sensed data to assess soil resources and conditions which affect productivity; (3) to investigate the use of satellite remote sensing data as an aid in assessing soil management practices; and (4) to evaluate the market potential of products derived from the above projects.

  14. Progress toward determining the potential of ODS alloys for gas turbine applications

    NASA Technical Reports Server (NTRS)

    Dreshfield, R. L.; Hoppin, G., III; Sheffler, K.

    1983-01-01

    The Materials for Advanced Turbine Engine (MATE) Program managed by the NASA Lewis Research Center is supporting two projects to evaluate the potential of oxide dispersion strengthened (ODS) alloys for aircraft gas turbine applications. One project involves the evaluation of Incoloy (TM) MA-956 for application as a combustor liner material. An assessment of advanced engine potential will be conducted by means of a test in a P&WA 2037 turbofan engine. The other project involves the evaluation of Inconel (TM) MA 6000 for application as a high pressure turbine blade material and includes a test in a Garrett TFE 731 turbofan engine. Both projects are progressing toward these engine tests in 1984.

  15. [Construction and validation of the "La Salle Instrument" to evaluate the ethical aspects in biomedical research on human beings].

    PubMed

    Valdivia-Gómez, Gilberto Guzmán; Velasco-Jiménez, María Teresa; Domínguez-González, Alejandro; Meneses-Ruíz, Dulce María; Padilla-García, Raúl Amauri

    2017-01-01

    Research projects must demonstrate not only a rigorous scientific methodology, but also the ethical aspects that require profound reflection of the reviewers. Current regulations establish criteria for research projects on human health, but many of these aspects are subjective. How can the evaluation of such projects be standardized? This is the main subject of the current project. This project comprises two phases. First, the design and construction of an instrument of evaluation based on the fundamental principles of bioethics, which are autonomy, beneficence, non-maleficence, and justice, and other aspects. The second phase consists of content validation through expert. During the phase of reviewing the instrument, it was necessary to make changes by adding, removing, or changing the concepts or criteria, which lead to the construction of the second version of the format. This new instrument was reviewed and analyzed by using the AGREE II instrument, and this version was validated by experts by greater than 95%. There are some recommendations to analyze the ethical aspects in research protocols involving human subjects, but they define the concepts and criteria to be evaluated. By presenting the criteria to be evaluated individually, the "La Salle instrument" allows the evaluation to be more objective and standardized.

  16. Evaluation of Koontz Lake (North Indiana) Ecological Restoration Options - Comparison of Dredging and Aeration - and Broad Application to USACE Projects

    DTIC Science & Technology

    2018-01-01

    Restoration Options – Comparison of Dredging and Aeration – and Broad Application to USACE Projects En vi ro nm en ta l L ab or at or y Victor F. Medina... Projects Victor F. Medina, Kaytee Pokrzywinski, and Edith Martinez-Guerra Environmental Laboratory U.S. Army Engineer Research and Development...Operations Technical Support Program 3909 Halls Ferry Road Vicksburg, MS 39180 Under Project No. TA2017-002, “Evaluation of Koontz Lake (Indiana

  17. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  18. A Real-World Project for a Desktop Publishing Course.

    ERIC Educational Resources Information Center

    Marsden, James D.

    1994-01-01

    Describes a project in a desktop publishing course in which students work with nonprofit and campus organizations to design brochures that fulfill important needs. Discusses specific tools students use. Describes the brochure project, project criteria, clients, text and graphics for the project, how to evaluate the project, and guidelines for…

  19. Arsenic Removal from Drinking Water by Iron Removal U.S. EPA Demonstration Project at Vintage on the Ponds in Delavan, WI Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Vintage on the Ponds in Delavan, WI. The objectives of the project were to evaluate: (1) the effectiveness of a Kinetico Macrolite® press...

  20. A Process Evaluation of Project Developmental Continuity: Final Report of the PDC Feasibility Study, 1974-1977.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…

  1. Evaluation of Nuclear Facility Decommissioning Projects program: a reference research reactor. Project summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baumann, B.L.; Miller, R.L.

    1983-10-01

    This document presents, in summary form, generic conceptual information relevant to the decommissioning of a reference research reactor (RRR). All of the data presented were extracted from NUREG/CR-1756 and arranged in a form that will provide a basis for future comparison studies for the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program.

  2. A SUMMARY REPORT AND EVALUATION OF TITLE I, P.L. 89-10, PROJECTS, SCHOOL YEAR 1965-66.

    ERIC Educational Resources Information Center

    IGE, PHILIP K.

    THIS EVALUATION REPORT OF HAWAII'S ELEMENTARY AND SECONDARY EDUCATION ACT, TITLE I, ACTIVITIES PRESENTS INFORMATION ABOUT THE NUMBER OF PROJECTS, THE NUMBER AND PERCENTAGE OF STUDENTS AND SCHOOLS COVERED BY TITLE I, AND THE ALLOCATIONS OF TITLE I FUNDS IN THE SEVEN SCHOOL DISTRICTS. IT ALSO DISCUSSES PERSONNEL, SERVICES, PROJECTS, EQUIPMENT, AND…

  3. A computerized tree growth projection system for forest resource evaluation in the lake states

    Treesearch

    Allen L. Lundgren; Burton L. Essex

    1978-01-01

    A computerized tree growth projection system has been developed for the Lake States Region as part of a larger Forest Resources Evaluation Program (FREP). Incorporating data from more than 1500 permanent growth plots throughout the Lake States, this system projects tree growth, mortality, regeneration, and removals in stands with any mixture of tree species and sizes,...

  4. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT CHATEAU ESTATES MOBILE HOME PARK IN SPRINGFIELD, OH. SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed for and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Chateau Estates Mobile Home Park at Springfield, OH. The objectives of the project are to evaluate the ef...

  5. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL USEPA DEMONSTRATION PROJECT AT BIG SAUK LAKE MOBILE HOME PARK IN SAUK CENTRE, MN. SIX MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Big Sauk Lake Mobile Home Park (BSLMHP) in Sauk Centre, MN. The objectives of the project are to evaluate the...

  6. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT SPRING BROOK MOBILE HOME PARK IN WALES, ME SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Spring Brook Mobile Home Park in Wales, ME. The objectives of the project are to evaluate the effectiv...

  7. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Spring Brook Mobile Home Park in Wales, ME Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Spring Brook Mobile Home Park (SBMHP) in Wales, Maine. The objectives of the project were to evaluate: 1) the effectiveness of an arsenic...

  8. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT CHATEAU ESTATES MOBILE HOME PARK IN SPRINGFIELD, OH. FINAL PERFORMANCE EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed for and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Chateau Estates Mobile Home Park at Springfield, OH. The objectives of the project are to evaluate the ef...

  9. Cognitive Academic Learning Approaches through ESL Content Area Instruction with Career Exploration Strategies (Project CALA). Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Guadalupe, Deana R.

    This report presents an evaluation of the Cognitive Academic Learning Approaches through ESL Content Area Instruction with Career Exploration Strategies (Project CALA)), an Elementary and Secondary Education Act Title VII-funded project in its fifth and last year of operation at International High School, a bilingual special alternative high…

  10. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Covered Wells in Tohono O’odham Nation, AZ - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Covered Wells in Tohono O’odham Nation, AZ. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies’ ...

  11. E.H.A., Part B Flow-Through Entitlement's Project Speak. O.E.E. Evaluation Report, 1981-82.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This report presents an evaluation of the third and final year of Project Speak, funded under Part B of the Education for All Handicapped Children Act. Project Speak was initiated to stimulate the language development of preschool handicapped children through direct instruction and parent training. The program provided home-based language…

  12. Clara Barton High School. Bilingual Project. O.E.E. Evaluation Report, 1981-1982.

    ERIC Educational Resources Information Center

    Shore, Rima; And Others

    The report evaluates the Bilingual-Bicultural Project conducted in 1981-82 at Clara Barton High School, in Brooklyn, New York, for 50 Spanish speaking students with limited English proficiency (LEP). The project was designed to provide tutorial support to LEP students and to enable them to be placed in one of the more challenging health profession…

  13. Development Project (2001-2004) of School Staff and Occupational Health Nurses as a Promoter of Occupational Wellbeing--Staff's Evaluations

    ERIC Educational Resources Information Center

    Saaranen, Terhi; Tossavainen, Kerttu; Turunen, Hannele; Naumanen, Paula

    2007-01-01

    This article reports on school staff's and occupational health nurses' development project (2001-2004), which aimed to promote school staff's occupational wellbeing by activities to maintain the ability to work in 12 comprehensive schools in Finland. The effects of the project were evaluated based on a follow-up study questionnaire presented to…

  14. Arsenic Removal from Drinking Water by Adsorptive Media. U.S. EPA Demonstration Project at Oak Manor Municipal Utility District at Alvin, TX. Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Oak Manor Municipal Utility District (MUD) facility in Alvin, TX. The objectives of the project were to evaluate 1) the effectiveness of a ...

  15. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Conneaut Lake Park in Conneaut Lake, PA - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Conneaut Lake Park (the Park) in Conneaut Lake, PA. The main objective of the project was to evaluate the effectiveness of AdEdge Techno...

  16. Teacher Retraining and Directed Exchange (T.R.A.D.E.): Pilot Project Documentation and Evaluation.

    ERIC Educational Resources Information Center

    Bragg, Debra D.; Miller, Aaron J.

    The Teacher Retraining and Directed Exchange (TRADE) project was conducted during the 1984-85 school year at five vocational schools in Ohio. During this period, a total of six teacher-employee exchanges were conducted with large and small businesses and industries. An evaluation of the project showed that, generally, the cost of implementing…

  17. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. U.S. EPA DEMONSTRATION PROJECT AT VILLAGE ON THE PONDS IN DELAVAN, WI. SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Vintage on the Ponds at Delavan, WI. The objectives of the project are to evaluate: (1) the effectiveness of Kine...

  18. Hexavalent Chromium Free Coatings Projects for Aerospace Applications

    DTIC Science & Technology

    2012-08-01

    1-Evaluate trivalent chromium pretreatment (TCP) for use on aluminum  2-Evaluate three hexavalent chrome free alternatives to DoD-P-15328 wash...UNCLASSIFIED UNCLASSIFIED Hexavalent Chromium Free Coatings Projects for Aerospace Applications Report Documentation Page Form...COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE Hexavalent Chromium Free Coatings Projects for Aerospace Applications 5a. CONTRACT NUMBER

  19. ARSENIC REMOVAL FROM DRINKING WATER BY POINT OF USE REVERSE OSMOSIS. EPA DEMONSTRATION PROJECT AT SUNSET RANCH DEVELOPMENT IN HOMEDALE, ID. SIX-MONTH EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the first six months of the point of use arsenic removal treatment technology demonstration project at the Sunset Ranch Development in Homedale, ID. The objectives of the project are to evaluate t...

  20. Guided Occupation Orientation Project: Syracuse City School District. 1972-73 School Year Informal Evaluation and Recommendation.

    ERIC Educational Resources Information Center

    Holder, Harold D.; And Others

    The report is designed primarily for internal use by administrators and staff members of the Guided Occupational Orientation Project in Syracuse, New York, and contains a summary evaluation for the 1972-73 school year activities associated with the project. One section of the report discusses and displays specific outcomes compared with goals…

  1. Management of an eLearning Evaluation Project: The e3Learning Model

    ERIC Educational Resources Information Center

    Lam, Paul; McNaught, Carmel

    2007-01-01

    This article describes the evaluation of purpose-built course websites for university-level teaching and learning developed by a funded project (e3Learning, e3L) in Hong Kong, which was designed to support teachers in three universities to supplement classroom teaching with eLearning. Previous articles on the e3L project have described the…

  2. A Study on the Evaluation of Science Projects of Primary School Students Based on Scientific Criteria

    ERIC Educational Resources Information Center

    Gungor, Sema Nur; Ozer, Dilek Zeren; Ozkan, Muhlis

    2013-01-01

    This study re-evaluated 454 science projects that were prepared by primary school students between 2007 and 2011 within the scope of Science Projects Event for Primary School Students. Also, submitted to TUBITAK BIDEB Bursa regional science board by MNE regional work groups in accordance with scientific research methods and techniques, including…

  3. Arsenic Removal from Drinking Water by Oxidation/Filtration and Adsorptive Media, U.S. EPA Demonstration Project at Clinton Christian School in Goshen, IN - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Clinton Christian School in Goshen, IN. The objectives of the project were to evaluate the effectiveness of AdEdge Technologies’...

  4. A Critical Evaluation of the Literature of the Troubles Project: Philosophy, Methodology, Findings/Outcomes

    ERIC Educational Resources Information Center

    Hanratty, Brian Robert

    2013-01-01

    The paper presents a critical evaluation of the Literature of the Troubles Project which was aimed at using literature in an educational context to help cement the process of peace and reconciliation between Northern Ireland's divided communities. The Project, funded by the Esmée Fairbairn Foundation, ran from September 2007 to August 2009. Its…

  5. Evaluation of Cross-Cultural Distance Learning in the Korean ELT Context

    ERIC Educational Resources Information Center

    Chang, Bok-Myung

    2015-01-01

    This study aims to review the development of NWCCDL Project during the last 10 years from (2005 to 2014) and evaluate the effects of NWCCDL Project on the students' satisfaction of the project and their affective domain. The research data was analyzed from the results of the questionnaires which were conducted at the end of every semester. This…

  6. Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO) Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Choonoo, John

    This report presents an evaluation of the Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO), an Elementary and Secondary Education Act Title VII-funded project in its first year of operation at Boys and Girls High School in Brooklyn (New York) and Louis D. Brandeis High School in Manhattan (New York). Participating…

  7. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  8. A Generalized Thurstonian Paired Comparison Multicriteria Heuristic Model for Peer Evaluation of Individual Performance on IS Team Projects

    ERIC Educational Resources Information Center

    Scher, Julian M.

    2010-01-01

    Information Systems instructors are generally encouraged to introduce team projects into their pedagogy, with a consequential issue of objectively evaluating the performance of each individual team member. The concept of "freeloading" is well-known for team projects, and for this, and other reasons, a peer review process of team members,…

  9. A New Strategy for Dealing with Social Loafers on the Group Project: The Segment Manager Method

    ERIC Educational Resources Information Center

    Dommeyer, Curt J.

    2012-01-01

    Professors often give members of a group project the same grade or they use peer evaluations to provide individualized grades. Unfortunately, both these methods have shortcomings. This article describes the segment manager method (SMM), a method for assigning individualized grades on the group project that does not rely on peer evaluations. A…

  10. Evaluation of Title I ESEA Projects, 1971-1972. Volume IV, Auxiliary Services to Schools and Pupils.

    ERIC Educational Resources Information Center

    Chern, Hermine J.; And Others

    This final volume of reports on the evaluation of ESEA Title I projects in Philadelphia 1971-1972 is concerned with the cluster "Auxiliary Services to Schools and Pupils." In this report are examined the theoretical bases for the creation and integration of projects directed toward the broad-based career development goals of the School…

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, J.B. Jr.

    Direct oblique sagittal CT was used to evaluate trauma to 77 orbits. Sixty-seven orbital wall fractures with intact orbital rims (36 floor, 22 medial wall, nine roof) were identified in 47 orbits. Since persistent diplopia and/or enophthalmos may warrant surgical repair of orbital floor fractures, optimal imaging should include an evaluation of extraocular muscle status, the nature and amount of displaced orbital contents, and an accurate definition of fracture margins. For orbital floor fractures, a combination of the direct oblique sagittal and direct coronal projections optimally displayed all fracture margins, the fracture's relationship to the inferior orbital rim and medialmore » orbital wall, and the amount of displacement into the maxillary sinus. Inferior rectus muscle status with 36 floor fractures was best seen on the direct oblique sagittal projection in 30 fractures (83.3%) and was equally well seen on sagittal and coronal projections in two fractures (5.5%). Floor fractures were missed on 100% of axial, 5.5% of sagittal, and 0% of coronal projections. Since the direct oblique sagittal projection complements the direct coronal projection in evaluating orbital floor fractures, it should not be performed alone. A technical approach to the CT evaluation or orbital wall fractures is presented.« less

  12. Integrating service development with evaluation in telehealthcare: an ethnographic study.

    PubMed

    Finch, Tracy; May, Carl; Mair, Frances; Mort, Maggie; Gask, Linda

    2003-11-22

    To identify issues that facilitate the successful integration of evaluation and development of telehealthcare services. Ethnographic study using various qualitative research techniques to obtain data from several sources, including in-depth semistructured interviews, project steering group meetings, and public telehealthcare meetings. Seven telehealthcare evaluation projects (four randomised controlled trials and three pragmatic service evaluations) in the United Kingdom, studied over two years. Projects spanned a range of specialties-dermatology, psychiatry, respiratory medicine, cardiology, and oncology. Clinicians, managers, technical experts, and researchers involved in the projects. Key problems in successfully integrating evaluation and service development in telehealthcare are, firstly, defining existing clinical practices (and anticipating changes) in ways that permit measurement; secondly, managing additional workload and conflicting responsibilities brought about by combining clinical and research responsibilities (including managing risk); and, thirdly, understanding various perspectives on effectiveness and the limitations of evaluation results beyond the context of the research study. Combined implementation and evaluation of telehealthcare systems is complex, and is often underestimated. The distinction between quantitative outcomes and the workability of the system is important for producing evaluative knowledge that is of practical value. More pragmatic approaches to evaluation, that permit both quantitative and qualitative methods, are required to improve the quality of such research and its relevance for service provision in the NHS.

  13. Advanced engineering environment collaboration project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weaponsmore » project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.« less

  14. National Ridesharing Demonstration Program : Comparative Evaluation Report

    DOT National Transportation Integrated Search

    1985-08-01

    The report evaluates 17 projects of the National Ridesharing Demonstration Program, with detailed analysis of five sites where a workplace survey was conducted--Atlanta, Cincinnati, Houston, Portland, and Seattle. Among the topics covered are project...

  15. Compendium of Traffic Safety Research Projects: 1985-1995 and Beyond

    DOT National Transportation Integrated Search

    1996-03-01

    The National Highway Traffic Safety Administration's Office of Program : Development and Evaluation (OPDE) conducts research and evaluation projects : dealing with human attitudes, behaviors and failures (motor vehicle crashes). : OPDE's focus is on ...

  16. MITSI project : final local evaluation report

    DOT National Transportation Integrated Search

    2003-01-01

    The mission statement for the MITSI project was facilitating National Standards Compliance migration for NaviGAtor, conducting National Architecture mapping for MARTA and E911, and evaluating CORBA as a methodology for exchanging data. This involved ...

  17. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 2.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    Part 2 of the three-part Vocational Evaluation Project final report contains brief summaries of the seven task force report which comprise the final report and two such task force reports. The report of task force 5, Standards for Vocational Evaluation, describes the task force's effort to study the standards for accreditation presently used by…

  18. Evaluation Report of the Presidential/Secretarial Objective -- School Management Options Available to Indian People. Research and Evaluation Report Series No. 29.08.

    ERIC Educational Resources Information Center

    National Indian Training and Research Center, Tempe, AZ.

    Presenting evaluations of the Bureau of Indian Affairs' (BIA) implementation of the School Management Option Project, a project designed to further American Indian control of schools and elevated to the status of Presidential/Secretarial Objective (P/SO) in 1974, this report includes separate evaluations by the National Indian Training and…

  19. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  20. Filmless radiology: The design, integration, implementation, and evaluation of a digital imaging network. Potential investigations to be conducted in conjunction with the Digital-Imaging Network System (DINS) evaluation project. Revision 1. Annual report, 1 March 1987-28 February 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerlin, B.D.; Cerva, J.R.; Glenn, M.E.

    This document describes evaluation studies and technical investigations proposed for the three-year Digital Imaging Network System (DINS) prototype project, sponsored by the U.S. Army Medical Research and Development Command, Ft. Detrick, Maryland. The project has three overall goals. The first is to install and operate a prototype DINS at each of two University-based hospitals for test purposes. The second is to evaluate key aspects of each prototype system once it is in full operation. The third is to develop guidelines and specifications for an operational DINS suitable for use by the military and others developing systems of the future. Thismore » document defines twelve overall evaluative questions for use in meeting the second and third objectives of the project and proposes studies that will answer these questions.« less

  1. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andersson, J.

    1993-12-31

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reasonmore » for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments.« less

  2. Ecological, Physical, and Socioeconomic Relationships Within Southern National Forests- Proceedings of the Southern Evaluation Project Workshop

    Treesearch

    Henry A. Pearson; Fred E. Smeins; Ronald E. Thill

    1987-01-01

    The results of 43 projects, which evaluated the flora, fauna, watersheds, socioeconomics,and forest pests located on southern National Forests were presented and discussed in 4 major categories: Management Outlook and Evaluation, Loblolly-Shortleaf Pine Type, Longleaf-Slash Pine Type, and Watersheds, Socioeconomics,and Forest Pests.

  3. Summative Evaluation of the Manukau Family Literacy Project, 2004

    ERIC Educational Resources Information Center

    Benseman, John Robert; Sutton, Alison Joy

    2005-01-01

    This report covers a summative evaluation of a family literacy project in Auckland, New Zealand. The evaluation covered 70 adults and their children over a two year period. Outcomes for the program included literacy skill gains for both adults and children, increased levels of self-confidence and self-efficacy, greater parental involvement in…

  4. EVALUATION OF THE WEIGHT-BASED COLLECTION PROJECT IN FARMINGTON, MINNESOTA: A MITE PROGRAM EVALUATION

    EPA Science Inventory

    This project evaluates a test program of a totally automated weight-based refuse disposal rate system. his test program was conducted by the City of Farmington, Minnesota between 1991 and 1993. he intent of the program was to test a mechanism which would automatically assess a fe...

  5. 76 FR 58861 - Notice of Opportunity To Participate, Criteria Requirements and Application Procedure for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... evaluate the conversion needs of the airport in its capital development plan to determine the appropriate... evaluate applications for redesignation primarily in terms of warranted projects fundable only under the... evaluate the need for eligible projects based upon information in the candidate airport's five-year Capital...

  6. 78 FR 72142 - Notice of Opportunity To Participate; Criteria and Application Procedures for Participation in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... evaluate the conversion needs of the airport in its capital development plan to determine the appropriate... evaluate applications for redesignation primarily in terms of warranted projects fundable only under the... designation and MAP funding. The FAA will evaluate the need for eligible projects based upon information in...

  7. From "At Risk" to "At Promise": An Evaluation of an Early Reading First Project

    ERIC Educational Resources Information Center

    Zoll, Susan Marie

    2012-01-01

    This study demonstrates the impact of an Early Reading First intervention on preschool children's language and literacy development using an ex post facto, causal-comparative research design. The project's professional development model was evaluated to produce a process and outcome evaluation to answer two overarching research questions: (1) What…

  8. Longitudinal Evaluation of 2 + 2 Career-Vocational Education Articulation Projects. First Year Interim Report.

    ERIC Educational Resources Information Center

    Evaluation and Training Inst., Los Angeles, CA.

    Twenty-one California career-vocational educational articulation projects, commonly referred to as 2 + 2 partnerships, were jointly funded across the 1986-89 funding period and third-party evaluations were conducted in 1988-89. The longitudinal study examined the long-term effects of the original partnerships. Evaluators formed an advisory…

  9. An Evaluation of the Nutrition Education and Training Program: Project Summary.

    ERIC Educational Resources Information Center

    St. Pierre, Robert G.

    This project summary reviews and extends the findings of prior reports made by Abt Associates, Inc. (Cambridge, Massachusetts) on the Nutrition Education and Training (NET) program, synthesizes evaluation efforts in nutrition education, and presents a set of conclusions based on the evaluations of nutrition programs. Chapter 1 presents background…

  10. Evaluating Technology-Based Educational Interventions: A Review of Two Projects

    ERIC Educational Resources Information Center

    Adamo-Villani, Nicoletta; Dib, Hazar

    2013-01-01

    The article discusses current evaluation methodologies used to assess the usability, user enjoyment, and pedagogical efficacy of virtual learning environments (VLEs) and serious games. It also describes the evaluations of two recently developed projects: a virtual learning environment that employs a fantasy 3D world to engage deaf and hearing…

  11. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  12. School Furniture Development: An Evaluation. Educational Studies and Documents No. 16.

    ERIC Educational Resources Information Center

    Scriven (F.B.) and Associates, London (England).

    Unesco is playing an increasingly important role in helping developing countries adapt school furniture in line with educational methods and goals. This publication includes an independent evaluation of Unesco's school furniture projects in Sri Lanka and Tunisia. For purposes of comparison, evaluation of a furniture project carried out by the…

  13. Intensive Reading Instructional Teams, Evaluation Manual for Project Directors.

    ERIC Educational Resources Information Center

    Nearine, Robert J.

    In this manual, project directors of the Intensive Reading Instructional Teams (IRIT) program in Hartford, Connecticut, public schools, are provided with suggestions for evaluating compensatory programs such as the IRIT. Three models for basic Title I evaluation are discussed and compared: a norm-referenced model, a control group design, and a…

  14. Evaluating the Effectiveness Of Postfire Rehabilitation Treatments

    Treesearch

    Peter R. Robichaud; Jan L. Beyers; Daniel G. Neary

    2000-01-01

    Spending on postfire emergency watershed rehabilitation has increased during the past decade. A west-wide evaluation of USDA Forest Service burned area emergency rehabilitation (BAER) treatment effectiveness was undertaken as a joint project by USDA Forest Service Research and National Forest System staffs. This evaluation covers 470 fires and 321 BAER projects, from...

  15. Evaluating the effectiveness of postfire rehabilitation treatments

    Treesearch

    Peter R. Robichaud; Jan L. Beyers; Daniel G. Neary

    2000-01-01

    Spending on postfire emergency watershed rehabilitation has increased during the past decade. A west-wide evaluation of USDA Forest Service burned area emergency rehabilitation (BAER) treatment effectiveness was undertaken as a joint project by USDA Forest Service Research and National Forest System staffs. This evaluation covers 470 fires and 321 BAER projects, from...

  16. EVALUATION OF A PROCEDURE FOR USING DAYLIGHT PROJECTION OF FILM LOOPS IN TEACHING SKILLS.

    ERIC Educational Resources Information Center

    HARBY, S.F.

    EQUIPMENT USING A TRANSLUCENT SCREEN AND REAR PROJECTION HAS MADE IT POSSIBLE TO PROJECT MOTION PICTURES IN DAYLIGHT (DAYLIGHT PROJECTION). FILMS CAN BE SHOWN REPEATEDLY WHEN FORMED INTO A FILM LOOP (CONTINUOUS LOOP PROJECTION). DAYLIGHT PROJECTION AND CONTINUOUS LOOP PROJECTION WERE USED TO INVESTIGATE THE FOLLOWING QUESTIONS--(1) ARE FILM LOOP…

  17. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    PubMed

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toro, Javier, E-mail: jjtoroca@unal.edu.co; Requena, Ignacio, E-mail: requena@decsai.ugr.es; Duarte, Oscar, E-mail: ogduartev@unal.edu.co

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes themore » inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.« less

  19. [Evaluation of public health risk. A new instrument for environmental management in Chile].

    PubMed

    Matus C, Patricia

    2011-08-01

    One of the main challenges in environmental management is to prevent the public health impact of projects that can cause pollution. To tackle this problem, the new Chilean bill on environmental management has defined the need to determine the potential health risks of a given Project. This paper gives a summary of the method used for risk evaluation and its evolution. Its incorporation in the Environmental Impact Evaluation System is proposed, to guarantee an effective prevention of the potential risks on health of new projects.

  20. Chapter 23: Combined Heat and Power Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Simons, George; Barsun, Stephan

    The main focus of most evaluations is to determine the energy-savings impacts of the installed measure. This protocol defines a combined heat and power (CHP) measure as a system that sequentially generates both electrical energy and useful thermal energy from one fuel source at a host customer's facility or residence. This protocol is aimed primarily at regulators and administrators of ratepayer-funded CHP programs; however, project developers may find the protocol useful to understand how CHP projects are evaluated.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Jennifer

    The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownershipmore » for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.« less

  2. The evolution of an evaluation: a case study using the tribal participatory research model.

    PubMed

    Richmond, Lucinda S; Peterson, Donna J; Betts, Sherry C

    2008-10-01

    This article presents a case study of how the evaluation design for a dating violence prevention and/or youth development program for American Indian youth in Arizona evolved throughout the project. Particular attention is given to how the evaluation design was guided by the tribal participatory research model. A brief rationale for the project is presented along with literature on culturally competent evaluation and research with American Indians. A description of the project and the unique communities in which it was implemented is provided. The focus of the article is the process of how the evaluation plan changed and how various factors influenced this process (e.g., feedback from community stakeholders, conversations with funder, results of process evaluation, suggestions from literature, the authors' experience working in American Indian communities). The authors conclude with lessons learned for others to consider as they develop working relationships and evaluation plans in similar communities.

  3. Public library consumer health information pilot project: results of a National Library of Medicine evaluation

    PubMed Central

    Wood, Fred B.; Lyon, Becky; Schell, Mary Beth; Kitendaugh, Paula; Cid, Victor H.; Siegel, Elliot R.

    2000-01-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was the case here. PMID:11055298

  4. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    PubMed

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was the case here.

  5. Fidelity of test development process within a national science grant

    NASA Astrophysics Data System (ADS)

    Brumfield, Teresa E.

    In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had no control---and by time. The purpose for studying the case was to gain a more in-depth, holistic understanding of the real-life test development task that took place within a project evaluation context. In particular, this case study investigated how the actual test development process was affected by: (1) the national and state (i.e., NC) science standards, (2) the NSF's definition of "evidence" in a project evaluation, (3) the MSP project's understanding of the role of the to-be-developed tests in their project evaluation, (4) the MSP project's understanding of the test development process, and (5) the MSP project's participants (e.g., teacher item-writers and scientists). From an investigation of this case, it was concluded that: (a) constructing psychometrically sound tests within an evaluation is not easy, (b) sufficient time and resources to construct such measures properly are seldom provided, and (c) test construction---at least within an evaluation---is not routine and unproblematic. Based upon the results from this case study, it was recommended that stakeholders (i.e., program managers, project directors, and evaluators) be familiar with the steps and standards used to develop psychometrically sound tests. Additionally, it was recommended that, for future research, a meta-analysis that examines only the test development process be conducted of all other MSP projects. A second suggested future research area was to establish a protocol that provides a systematic means by which to examine an existing or proposed MSP project for alignment with state science standards. Such a protocol would be cost-effective in that demonstrated alignment with state science standards would enable projects to use existing state science assessments, which must be in place, according to NCLB, by the 2007-2008 school year, to demonstrate student achievement. In this way, project directors and evaluators, typically with limited familiarity with the steps and standards by which psychometrically sound assessments are created, would not be placed in the role of test developer.

  6. FINAL PROJECT REPORT - EVALUATION AND TESTING OF HTGR REACTOR BUILDING RESPONSE TO DEPRESSURIZATION ACCIDENTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLIANCE LIMITED, NGNP INDUSTRY

    This report provides a description of the project, summarizes each phase of the project, and ends with project conclusions. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.

  7. 7 CFR 1486.506 - When will a project be reviewed?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  8. 76 FR 44929 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... proposed information collection project: ``Evaluation of ARRA Comparative Effectiveness Research... INFORMATION: Proposed Project Evaluation of ARRA Comparative Effectiveness Research Dissemination Contractor... for reviewing and disseminating Comparative Effectiveness Research (CER) and findings to clinicians...

  9. Evaluation of the Treatment of Diabetic Retinopathy A Research Project

    ERIC Educational Resources Information Center

    Kupfer, Carl

    1973-01-01

    Evaluated is the treatment of diabetic retinopathy (blindness due to ruptured vessels of the retina as a side effect of diabetes), and described is a research project comparing two types of photocoagulation treatment. (DB)

  10. Evaluation of 1982 selective speed enforcement projects in Virginia.

    DOT National Transportation Integrated Search

    1985-01-01

    This report describes and evaluates Virginia's FY 1982 selective speed enforcement projects. The state allocates federal monies among competing state and local police agencies to fund their efforts to reduce identified crash problems. As a condition ...

  11. Evaluation of Speed Control Signs for Small Rural Towns

    DOT National Transportation Integrated Search

    2006-04-14

    This report presents the results of the national evaluation of the Sacramento-Watt Avenue Transit Signal Priority Project, a cooperative project between Sacramento County and the Sacramento Regional Transit District (RT) to deploy transit signal prio...

  12. Northeast Florida rural transit intelligent transportation system (ITS) : evaluation plan

    DOT National Transportation Integrated Search

    2001-05-01

    The Northeast Florida Rural Transportation Intelligent Transportation System (ITS) project is a demonstration of ITS deployment in five rural Community Transportation Coordinator (CTC) agencies. The objective of the project is to test and evaluate th...

  13. Evaluation of traffic control devices : fifth-year activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This project was established to provide a means of conducting limited scope evaluations of numerous traffic : control device issues. During the fifth, and final, year of the project, researchers conducted four activities: : improving the interface fo...

  14. An economic analysis methodology for project evaluation and programming.

    DOT National Transportation Integrated Search

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  15. Evaluation of the Bangalore Project.

    ERIC Educational Resources Information Center

    Beretta, Alan; Davies, Alan

    1985-01-01

    Follows up an article by Brumfit on the Bangalore/Madras Communicational Teaching Project (CTP). Discusses the framework, tests, and results of a 1984 evaluation supporting the claim that grammar construction can take place through a focus on meaning alone. (SED)

  16. Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rasmussen, Larry; Wright, Patrick

    1990-10-01

    The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat,more » 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.« less

  17. Rigor + Results = Impact: Measuring Impact with Integrity (Invited)

    NASA Astrophysics Data System (ADS)

    Davis, H. B.; Scalice, D.

    2013-12-01

    Are you struggling to measure and explain the impact of your EPO efforts? The NASA Astrobiology Institute (NAI) is using an evaluation process to determine the impact of its 15 EPO projects with over 200 activities. What is the current impact? How can it be improved in the future? We have developed a process that preserves autonomy at the project implementation level while still painting a picture of the entire portfolio. The impact evaluation process looks at an education/public outreach activity through its entire project cycle. Working with an external evaluator, education leads: 1) rate the quality/health of an activity in each stage of its cycle, and 2) determine the impact based on the results of the evaluation and the rigor of the methods used. The process has created a way to systematically codify a project's health and its impact, while offering support for improving both impact and how it is measured.

  18. Critical factors for optimising skill-grade-mix based on principles of Lean Management - a qualitative substudy

    PubMed

    Inauen, Alice; Rettke, Horst; Fridrich, Annemarie; Spirig, Rebecca; Bauer, Georg F

    2017-01-01

    Background: Due to scarce resources in health care, staff deployment has to meet the demands. To optimise skill-grade-mix, a Swiss University Hospital initiated a project based on principles of Lean Management. The project team accompanied each participating nursing department and scientifically evaluated the results of the project. Aim: The aim of this qualitative sub-study was to identify critical success factors of this project. Method: In four focus groups, participants discussed their experience of the project. Recruitment was performed from departments assessing the impact of the project retrospectively either positive or critical. In addition, the degree of direct involvement in the project served as a distinguishing criterion. Results: While the degree of direct involvement in the project was not decisive, conflicting opinions and experiences appeared in the groups with more positive or critical project evaluation. Transparency, context and attitude proved critical for the project’s success. Conclusions: Project managers should ensure transparency of the project’s progress and matching of the project structure with local conditions in order to support participants in their critical or positive attitude towards the project.

  19. Performance evaluation of restaurant food waste and biowaste to biogas pilot projects in China and implications for national policy.

    PubMed

    De Clercq, Djavan; Wen, Zongguo; Fan, Fei

    2017-03-15

    The objective of this research was to conduct a performance evaluation of three food waste/biowaste-to-biogas pilot projects across 7 scenarios in China based on multi-criteria decision analysis (MCDA) methodology. The projects ranked included a food waste-biogas project in Beijing, a food waste-biogas project in Suzhou and a co-digestion project producing biomethane in Hainan. The projects were ranked from best to worst based on technical, economic and environmental criteria under the MCDA framework. The results demonstrated that some projects are encountering operational problems. Based on these findings, six national policy recommendations were provided: (1) shift away from capital investment subsidies to performance-based subsidies; (2) re-design feed in tariffs; (3) promote bio-methane and project clustering; (4) improve collection efficiency by incentivizing FW producers to direct waste to biogas projects; (5) incentivize biogas projects to produce multiple outputs; (6) incentivize food waste-based projects to co-digest food waste with other substrates for higher gas output. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. The Use of Culture Portfolio Project in a Korean Culture Classroom: Evaluating Stereotypes and Enhancing Cross-Cultural Awareness

    ERIC Educational Resources Information Center

    Byon, Andrew Sangpil

    2007-01-01

    This paper investigates a case of designing, implementing, and evaluating a semester-long culture portfolio project in a Korean culture class in an American university setting. The paper addresses the following four issues: (1) How does the project help the students gain insights into a particular aspect of Korean culture and encourage them to…

  1. The Effect of a Community Project on Sense of Community among Social Work Students: An Exploratory Evaluative Study

    ERIC Educational Resources Information Center

    Boehm, Amnon; Moin, Victor

    2014-01-01

    This article evaluates the effect of a community project that was adopted by the students of a school of social work in Israel. A quasi-experimental pretest-posttest design was used. The pretest was administered during the planning stage of the project and the posttest a year later, during the implementation period. The findings show a significant…

  2. Assisting Newcomers through Employment and Support Services: An Evaluation of the New Americans Centers Demonstration Project in Arkansas and Iowa. Final Report

    ERIC Educational Resources Information Center

    Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy

    2010-01-01

    This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…

  3. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Big Sauk Lake Mobile Home Park in Sauk Centre, MN Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed and the results obtained from the one-year arsenic removal treatment technology demonstration project at the Big Sauk Lake Mobile Home Park (BSLMHP) in Sauk Centre, MN. The objectives of the project are to evaluate (1) the effective...

  4. Report for the Evaluation of the Reading Is Fundamental Project 1973-74. Research Report No. 74-289.

    ERIC Educational Resources Information Center

    Lym, C. LaVor; Averitt, Gwen

    The Reading Is Fundamental (RIF) program is designed to give disadvantaged children incentive to read by letting them choose books from a wide variety of paperbacks and keep them as their own. This document reports on the evaluation procedures and results for the Dallas RIF Project in 1973-1974. Following a description of the project and its…

  5. ARSENIC REMOVAL FROM DRINKING WATER BY POINT-OF-USE (POU) REVERSE OSMOSIS. U.S. EPA DEMONSTRATION PROJECT AT SUNSET RANCH DEVELOPMENT IN HOMEDALE, ID. FINAL PERFORMANCE EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal technology demonstration project at the Sunset Ranch Development in Homedale, ID. The objectives of the project are to evaluate: 1) the effectiveness of a point of use (POU) re...

  6. Harmony in Career Learning and Scholastic System: Project Hi-Class 1988-89. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Hriskos, Constantine

    The report presents an evaluation of the New York City Harmony in Career Learning and Scholastic System (Project HI-CLASS) based on results from the 1988-89 school year. The project provided support services to 420 Spanish- and Chinese-speaking students of limited English proficiency (LEP). It also proposed to instill pride in and respect for…

  7. Arsenic Removal from Drinking Water by Point of Entry/Point of Use Adsorptive Media U.S. EPA Demonstration Project at Oregon Institute of Technology at Klamath Falls, OR - Final Performance Evaluation Report

    EPA Science Inventory

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at Oregon Institute of Technology (OIT) at Klamath Falls, OR. The objectives of the project were to evaluate: (1) the effectiveness...

  8. Emergency School Aid Act, Pilot Project, 1975-76. Part I and Part II. Research and Evaluation Report, Vol. 10, No. 12.

    ERIC Educational Resources Information Center

    Crawley, Nora; Taylor, Myrtice

    This paper describes and evaluates a pilot project funded under the Emergency School Aid Act (ESAA). The pilot project was subdivided into two parts: the Camp Learning Center program, and the Cultural Adjustment Program. Among the general goals of the Camp Learning Center were to improve mathematics and reading skills through a relevant and…

  9. Career Awareness Program. Project CAP. 1989-90. Final Evaluation Report. OREA Report.

    ERIC Educational Resources Information Center

    Zhang, Hong

    An evaluation of the fourth year of funding of the Career Awareness Program (Project CAP) by Title VII of the Elementary and Secondary Education Act is presented. Project CAP provided instruction and support services to Chinese-speaking students (n=285), grades 5 through 9, at 2 intermediate schools in New York City, I.S. 73 in Queens and I.S. 131…

  10. Evaluation of microfinance projects.

    PubMed

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  11. The machine intelligence Hex project

    NASA Astrophysics Data System (ADS)

    Chalup, Stephan K.; Mellor, Drew; Rosamond, Fran

    2005-12-01

    Hex is a challenging strategy board game for two players. To enhance students’ progress in acquiring understanding and practical experience with complex machine intelligence and programming concepts we developed the Machine Intelligence Hex (MIHex) project. The associated undergraduate student assignment is about designing and implementing Hex players and evaluating them in an automated tournament of all programs developed by the class. This article surveys educational aspects of the MIHex project. Additionally, fundamental techniques for game programming as well as specific concepts for Hex board evaluation are reviewed. The MIHex game server and possibilities of tournament organisation are described. We summarise and discuss our experiences from running the MIHex project assignment over four consecutive years. The impact on student motivation and learning benefits are evaluated using questionnaires and interviews.

  12. I-15 North Project

    DOT National Transportation Integrated Search

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  13. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    PubMed

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  14. Alternative Designs for Evaluating Workplace Literacy Programs. Conference Proceedings and Commissioned Papers at the "Design Guidance for Evaluating Workplace Literacy Programs" Work Group Conference (Washington, D.C. April 13, 1993).

    ERIC Educational Resources Information Center

    Research Triangle Inst., Research Triangle Park, NC.

    This document contains the five papers presented at a meeting at which key issues in evaluating workplace literacy programs were discussed. In "Key Components of Workplace Liteacy Projects and Definitions of Project 'Modules,'" Judith A. Alamprese describes the context for evaluating the National Extension Program, components of workplace literacy…

  15. A Study on Project Priority Evaluation Method on Road Slope Disaster Prevention Management

    NASA Astrophysics Data System (ADS)

    Sekiguchi, Nobuyasu; Ohtsu, Hiroyasu; Izu, Ryuutarou

    To improve the safety and security of driving while coping with today's stagnant economy and frequent natural disasters, road slopes should be appropriately managed. To achieve the goals, road managers should establish project priority evaluation methods for each stage of road slope management by clarifying social losses that would result by drops in service levels. It is important that road managers evaluate a project priority properly to manage the road slope effectively. From this viewpoint, this study proposed "project priority evaluation methods" in road slope disaster prevention, which use available slope information at each stage of road slope management under limited funds. In addition, this study investigated the effect of managing it from the high slope of the priority by evaluating a risk of slope failure. In terms of the amount of available information, staged information provision is needed ranging from macroscopic studies, which involves evaluation of the entire route at each stage of decision making, to semi- and microscopic investigations for evaluating slopes, and microscopic investigations for evaluating individual slopes. With limited funds, additional detailed surveys are difficult to perform. It is effective to use the slope risk assessment system, which was constructed to complement detailed data, to extract sites to perform precise investigations.

  16. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  17. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  18. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  19. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  20. An Evaluation of the English Language Skills Acceleration Project, FY 1974.

    ERIC Educational Resources Information Center

    Trust Territory of the Pacific Islands

    An evaluation of the English Language Skills Acceleration Project, a program used in ninth-grade reading instruction in two high schools in the Marshall Islands, is provided in this report. Included are a description of the program and its activities, a discussion and comparison of test results, an evaluation of the behavioral objectives with…

  1. Job Training for the Homeless: Report on Demonstration's First Year. Research and Evaluation Report Series 91-F.

    ERIC Educational Resources Information Center

    Bailis, Lawrence N.; And Others

    An interim evaluation analyzed the first year of operation of the Job Training for the Homeless Demonstration Program (JTHDP). Data were collected from quarterly progress reports and evaluation reports submitted by 32 local JTHDP projects. The projects exceeded planned levels of clients served and achieved other positive outcomes, including…

  2. Evaluating Vocational Educators' Training Programs: A Kirkpatrick-Inspired Evaluation Model

    ERIC Educational Resources Information Center

    Ravicchio, Fabrizio; Trentin, Guglielmo

    2015-01-01

    The aim of the article is to describe the assessment model adopted by the SCINTILLA Project, a project in Italy aimed at the online vocational training of young, seriously-disabled subjects and their subsequent work inclusion in smart-work mode. It will thus describe the model worked out for evaluation of the training program conceived for the…

  3. Pilot Program on Common Status Measures Objective-Referenced Tests. Colorado Evaluation Project, Report No. 1.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Education, Denver.

    The purpose of the Colorado Evaluation Project was to field test the Common Status Measures at grades four and eleven in conjunction with a statewide assessment program based on objective-referenced testing instruments developed by the Colorado Department of Education for grades kindergarten, three, six, nine, and twelve. The evaluation was…

  4. Evaluating the Professional Learning for "Cultural Mathematics" in Papua New Guinea's Elementary Schools

    ERIC Educational Resources Information Center

    Bino, Vagi; Sakopa, Priscilla; Tau, Kila; Kull, Martha

    2014-01-01

    Qualitative and quantitative data are both being used to evaluate a large project in remote areas of Papua New Guinea. Results from teacher and student questionnaires are yet to be evaluated. The responses from teachers participating in the project workshops are reported here to be extremely positive towards the content and delivery of the…

  5. Design and Implementation of a Multi-Strategy, Collegewide Program of Evaluation and Planning: The Mercy College Self-Study Project.

    ERIC Educational Resources Information Center

    Kraetzer, Mary C.; And Others

    The rationale, strategies, and methods of The Mercy College Self-Study Project are considered, and evaluation instruments are provided. This program of institutional evaluation and planning was initiated in 1980 and consists of: standardized surveys, a 10-year longitudinal (panel) study, and academic department self-studies. Questionnaires…

  6. Goldsboro-Wayne County E.S.E.A. Title III. Final Evaluation Report, 1974-1975.

    ERIC Educational Resources Information Center

    Educational Planning and Evaluation Consultants, Inc., Chapel Hill, NC.

    Contained in the final report is evaluation information for the Goldsboro-Wayne County (North Carolina) Elementary and Secondary Education Act Title III Project for 35 moderately, severely, and profoundly retarded children (3-16 years old) during the 1974-75 school year. The project was evaluated through analysis of behavior change data and…

  7. Community Arts for Health: An Evaluation of a District Programme

    ERIC Educational Resources Information Center

    South, Jane

    2006-01-01

    Purpose: The purpose of this paper is to present an evaluation of a community arts for health programme in the UK involving the delivery of three separate projects targeted at disadvantaged areas. Design/methodology/approach: Evaluation plans were drawn up for each project, which linked long-term goals, objectives, indicators of success and data…

  8. Social impact evaluation: Some implications of the specific decisional context approach for Anticipatory Project Assessment (ARA)

    NASA Technical Reports Server (NTRS)

    Mayo, L. H.

    1975-01-01

    An anticipatory project assessment is discussed which is characterized as the capacity to perform, and the disposition to take into account in relevant decisional areas, the following operations: identification of the significant effects which will result from the introduction of a specified project configuration into alternative projected future social environments during the planning, implementation, and operational states; evaluation of such effects in terms of social impacts on affected participants and social value-institutional processes in accord with specified concepts of social justice.

  9. Evaluation of rubber-asphalt chip seals in Oregon : final report.

    DOT National Transportation Integrated Search

    1982-09-01

    The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...

  10. Evaluation of rubber-asphalt chip seal in Oregon : interim report.

    DOT National Transportation Integrated Search

    1977-05-01

    The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...

  11. Monitoring and Evaluating Nonpoint Source Watershed Projects

    EPA Pesticide Factsheets

    This guide is written primarily for those who develop and implement monitoring plans for watershed management projects. it can also be used evaluate the technical merits of monitoring proposals they might sponsor. It is an update to the 1997 Guide.

  12. Manual for research, development and technology program and project evaluations : final report.

    DOT National Transportation Integrated Search

    2016-04-01

    This manual provides the Federal Railroad Administrations (FRA) Office of Research, Development and Technology (RD&T) a : framework, standards, and procedures for planning, conducting, reporting, and using sound evaluations of RD&Ts projects fo...

  13. Evaluation of the carpool program at the University of Florida

    DOT National Transportation Integrated Search

    2000-12-01

    The University of Florida reactivated its carpool program in May 1997. The purpose of this project is to evaluate how successful the project has been using various perforamnce indicators within three main perspectives--the University, the surrounding...

  14. Evaluation of a concrete pavement restoration project in Virginia.

    DOT National Transportation Integrated Search

    1994-01-01

    The purpose of this Federal Highway Administration Demonstration Project was to evaluate the installation and performance of a section of I-81 in Botetourt County, Virginia, that was rehabilitated by concrete pavement restoration (CPR) methods. The s...

  15. Continued field evaluation of precutting for maintaining asphalt concrete pavements with thermal cracking.

    DOT National Transportation Integrated Search

    2017-08-01

    In continuation of a previously completed project entitled Evaluate Presawn Transverse Thermal Cracks for Asphalt Concrete Pavement, this project was a further effort to understand important variables in the thermal cracking process through continued...

  16. 49 CFR 611.9 - Project justification criteria for grants and loans for fixed guideway systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... evaluations and assign ratings for project justification, FTA will evaluate information developed locally... of the criteria will be expressed in terms of descriptive indicators, as follows: “high,” “medium...

  17. 49 CFR 611.9 - Project justification criteria for grants and loans for fixed guideway systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... evaluations and assign ratings for project justification, FTA will evaluate information developed locally... of the criteria will be expressed in terms of descriptive indicators, as follows: “high,” “medium...

  18. 49 CFR 611.9 - Project justification criteria for grants and loans for fixed guideway systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... evaluations and assign ratings for project justification, FTA will evaluate information developed locally... of the criteria will be expressed in terms of descriptive indicators, as follows: “high,” “medium...

  19. Oregon Green Light CVO evaluation : final report : executive summary

    DOT National Transportation Integrated Search

    2001-04-01

    This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...

  20. Framework for selection and evaluation of bicycle and pedestrian safety projects in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    The Virginia Department of Transportation's (VDOT) Bicycle and Pedestrian Safety (BPS) Program provides funds for implementing short-term, low-cost bicycle and pedestrian safety projects in Virginia. This initiative is administered by evaluating each...

Top