DUF6 Conversion Facility EIS Alternatives
in the Depleted UF6 Conversion Facility EISs. Proposed Action The proposed action evaluated in each Action Alternative No Action Alternative. Under the "no action" alternative, cylinder
DOE Office of Scientific and Technical Information (OSTI.GOV)
none
1998-03-01
This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1998-06-01
This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
40 CFR 1502.14 - Alternatives including the proposed action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and... action so that reviewers may evaluate their comparative merits. (c) Include reasonable alternatives not...
40 CFR 1502.14 - Alternatives including the proposed action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and... action so that reviewers may evaluate their comparative merits. (c) Include reasonable alternatives not...
40 CFR 1502.14 - Alternatives including the proposed action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and... action so that reviewers may evaluate their comparative merits. (c) Include reasonable alternatives not...
40 CFR 1502.14 - Alternatives including the proposed action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and... action so that reviewers may evaluate their comparative merits. (c) Include reasonable alternatives not...
40 CFR 1502.14 - Alternatives including the proposed action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and... action so that reviewers may evaluate their comparative merits. (c) Include reasonable alternatives not...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Boehlecke
2004-04-01
The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, whichmore » were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.« less
1984-06-01
Establishing or changing priorities Program evaluation is economic analysis of ongoing actions to determine how best to improve an approved program...on an analysis as called for herein. When proposed actions are specifically directed by legislation or prior irrevocable management decisions which...continuing the present course of action , or inaction, may be a feasible alternative. The identification of alternative courses of action is an
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2004-04-01
This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
Evaluating Alternative High Schools: Program Evaluation in Action
ERIC Educational Resources Information Center
Hinds, Drew Samuel Wayne
2013-01-01
Alternative high schools serve some of the most vulnerable students and their programs present a significant challenge to evaluate. Determining the impact of an alternative high school that serves mostly at-risk students presented a significant research problem. Few studies exist that dig deeper into the characteristics and strategies of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-05-01
Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend correctivemore » action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, Nevada Operations Office
2000-02-08
This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2003-08-06
This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whelan, G.; Hartz, K.E.; Hilliard, N.D.
1990-04-01
Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluatedmore » and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.« less
DOT National Transportation Integrated Search
1973-01-01
Cost-benefit analysis is sometimes a useful tool for evaluating the advantages and disadvantages of alternative courses of action. The first half of this study was an attempt to further the use of such analysis in the evaluation of a highway safety p...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
The Record of Decision presents the selected remedial action for the Oil/Water separator at Building 918 Operable Unit (Site OT 40). There are hazardous substances present in the shallow groundwater at levels below those that would cause risk. Additionally, arsenic and lead exist in soils at levels within regional background levels. The site poses a minimal risk to public health, welfare, and the environment. The No Action alternative requires no actions be taken at the site. This alternative serves as a baseline for comparison and CERCLA requires it be evaluated. It is the preferred alternative at this site because themore » other alternatives offer no substantial advantages.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-04-01
Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluatemore » and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.« less
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
Draft Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1995-01-01
The Draft Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA's participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop a human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
Methods for the evaluation of alternative disaster warning systems. Executive summary
NASA Technical Reports Server (NTRS)
Agnew, C. E.; Anderson, R. J., Jr.; Lanen, W. N.
1977-01-01
Methods for estimating the economic costs and benefits of the transmission-reception and reception-action segments of a disaster warning system (DWS) are described. Methods were identified for the evaluation of the transmission and reception portions of alternative disaster warning systems. Example analyses using the methods identified were performed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less
Remedial Action Assessment System: A computer-based methodology for conducting feasibility studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, M.K.; Buelt, J.L.; Stottlemyre, J.A.
1991-02-01
Because of the complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process. The Remedial Action Assessment System (RAAS), can be used for screening, linking, and evaluating established technology processes in support of conducting feasibility studies. It is also intended to do the same in support of corrective measures studies. The user interface employs menus, windows, help features, and graphical information while RAAS is in operation. Object-oriented programming is used to link unit processes into sets ofmore » compatible processes that form appropriate remedial alternatives. Once the remedial alternatives are formed, the RAAS methodology can evaluate them in terms of effectiveness, implementability, and cost. RAAS will access a user-selected risk assessment code to determine the reduction of risk after remedial action by each recommended alternative. The methodology will also help determine the implementability of the remedial alternatives at a site and access cost estimating tools to provide estimates of capital, operating, and maintenance costs. This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses graphical, tabular and textual information about technologies, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1986-12-01
This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less
7 CFR 650.5 - Environmental evaluation in planning.
Code of Federal Regulations, 2014 CFR
2014-01-01
... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...
7 CFR 650.5 - Environmental evaluation in planning.
Code of Federal Regulations, 2011 CFR
2011-01-01
... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...
7 CFR 650.5 - Environmental evaluation in planning.
Code of Federal Regulations, 2013 CFR
2013-01-01
... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...
7 CFR 650.5 - Environmental evaluation in planning.
Code of Federal Regulations, 2012 CFR
2012-01-01
... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...
Mode of Action (MOA) Assignment Classifications for Ecotoxicology: An Evaluation of approaches
The mode of toxic action (MOA) is recognized as a key determinant of chemical toxicity and as an alternative to chemical class-based predictive toxicity modeling. However, MOA classification has never been standardized in ecotoxicology, and a comprehensive comparison of classific...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastor, Laura
2005-12-01
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada,more » and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark McLane
2005-03-01
This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for CAU 383.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on themore » analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.« less
Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000
2001-04-01
Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
Suboptimal Tradeoffs in Information Seeking
ERIC Educational Resources Information Center
Fu, Wai-Tat; Gray, Wayne D.
2006-01-01
Explicit information-seeking actions are needed to evaluate alternative actions in problem-solving tasks. Information-seeking costs are often traded off against the utility of information. We present three experiments that show how subjects adapt to the cost and information structures of environments in a map-navigation task. We found that…
2006-07-01
potential environmental consequences of the proposed action and no-action alternative and are addressed for: air quality, soils and water resources...evaluated in detail to identify potential environmental consequences: air quality; soils and water resources; biological resources; and cultural resources...significance. Therefore, this proposed action would not constitute a significant impact and would conform to regional standards. Soils and Water Resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
Busse, John; Keil, Karen; Staten, Jane
2013-07-01
The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)« less
Research in Public Schools: Purpose and Problem Areas.
ERIC Educational Resources Information Center
Hayman, John L., Jr.
This presentation clarifies the role of evaluation in public schools and discusses major problems which block the effectiveness of the role. Evaluation is used in schools to produce information that helps decision makers choose among alternative courses of action. Purpose, rather than methodology, distinguishes evaluation from research. The need…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NSO
The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker.more » Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of contamination, as necessary. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCollom, M.
1979-01-01
A comprehensive review of a wide range of alternatives to the proposed action, the commercial demonstration of an industrial cogenerating facility fired with wood fuels is provided. An extensive effort has been devoted to the evaluation of all reasonable alternatives to this project. A number of possible actions were also briefly considered, but, for various reasons, they were found not to be appropriate at present for a commercial-scale demonstration of an alternative energy source. The critical characteristics of the wood-fueled commercial demonstration project at Westbrook are considered to be: industrial cogeneration of power; the production of 510,000 pounds per hourmore » of industrial process steam; the production of approximately twenty-five megawatts of electric generating capacity, some of which would be available to a public utility in southern Maine; and the consumption of 2,000 tons of wood fuel per day. Each of the alternatives examined in this appendix offers a different option for one or several of the characteristics of the project listed above. As a whole, the appendix describes the range of possible actions that the US Department of Energy and its contractors have considered.« less
1998-12-01
3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
2009-04-01
Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
Alternative Fuels for Washington's School Buses: A Report to the Washington State Legislature.
ERIC Educational Resources Information Center
Lyons, John Kim; McCoy, Gilbert A.
This document presents findings of a study that evaluated the use of both propane and compressed natural gas as alternative fuels for Washington State school buses. It discusses air quality improvement actions by state- and federal-level regulators and summarizes vehicle design, development, and commercialization activities by all major engine,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
Is evaluating complementary and alternative medicine equivalent to evaluating the absurd?
Greasley, Pete
2010-06-01
Complementary and alternative therapies such as reflexology and acupuncture have been the subject of numerous evaluations, clinical trials, and systematic reviews, yet the empirical evidence in support of their efficacy remains equivocal. The empirical evaluation of a therapy would normally assume a plausible rationale regarding the mechanism of action. However, examination of the historical background and underlying principles for reflexology, iridology, acupuncture, auricular acupuncture, and some herbal medicines, reveals a rationale founded on the principle of analogical correspondences, which is a common basis for magical thinking and pseudoscientific beliefs such as astrology and chiromancy. Where this is the case, it is suggested that subjecting these therapies to empirical evaluation may be tantamount to evaluating the absurd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located withinmore » Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues, herbicides, pesticides, polychlorinated biphenyls, metals, and radionuclides. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irving, J.S.
DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irving, John S
DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
This decision document presents the selected remedy for surficial groundwater for a portion of Operable Unit (OU) No. 10 (Site 35), Marine Corps Base (MCB), Camp Lejeune, North Carolina. Five Remedial Action Alternatives (RAAs) were evaluated as part of an interim remedial investigation/feasibility study for surficial groundwater at OU No. 10 (Site 35). These RAAs included RAA 1 (No Action), RAA 2 (No Action With Institutional Controls), RAA 3 (Groundwater Collection and On-site Treatment), RAA 4 (In Situ Air Sparging and Off-Gas Carbon Adsorption) and RAA 5 (In Well Aeration and Off-Gas Adsorption). After all five RAAs were compared tomore » established criteria, RAA 5 was selected as the preferred alternative.« less
Final corrective action study for the former CCC/USDA facility in Ramona, Kansas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
Past operations at a grain storage facility formerly leased and operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Ramona, Kansas, resulted in low concentrations of carbon tetrachloride in groundwater that slightly exceed the regulatory standard in only one location. As requested by the Kansas Department of Health and Environment, the CCC/USDA has prepared a Corrective Action Study (CAS) for the facility. The CAS examines corrective actions to address groundwater impacted by the former CCC/USDA facility but not releases caused by other potential groundwater contamination sources in Ramona. Four remedial alternatives were considered in themore » CAS. The recommended remedial alternative in the CAS consists of Environmental Use Control to prevent the inadvertent use of groundwater as a water supply source, coupled with groundwater monitoring to verify the continued natural improvement in groundwater quality. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) has directed Argonne National Laboratory to prepare a Corrective Action Study (CAS), consistent with guidance from the Kansas Department of Health and Environment (KDHE 2001a), for the CCC/USDA grain storage facility formerly located in Ramona, Kansas. This effort is pursuant to a KDHE (2007a) request. Although carbon tetrachloride levels at the Ramona site are low, they remain above the Kansas Tier 2 risk-based screening level (RBSL) and the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 5 {micro}g/L (Kansas 2003, 2004). In its request for the CAS, the KDHE (2007a) stated that, because of these levels, risk is associated with potential future exposure to contaminated groundwater. The KDHE therefore determined that additional measures are warranted to limit future use of the property and/or exposure to contaminated media as part of site closure. The KDHE further requested comparison of at least two corrective action alternatives to the 'no-action' alternative, as the basis for the Draft Corrective Action Decision for the site. The history and nature of the contamination and previous investigations are summarized in Section 2. Also included in Section 2 is an evaluation of human and environmental targets and potential exposure pathways. Section 3 describes the corrective action goals and applicable or relevant and appropriate requirements (ARARs). Section 4 describes four alternatives, Section 5 analyzes the alternatives in detail, and Section 6 compares the alternatives. Section 6 also includes a summary and a recommended corrective action.« less
10 CFR 1022.13 - Floodplain or wetland assessment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... negative, direct and indirect, and long- and short-term effects of the proposed action on the floodplain... wetland values (§ 1022.4) appropriate to the location under evaluation. In addition, the effects of a..., the effects on the survival, quality, and function of the wetland shall be evaluated. (3) Alternatives...
78 FR 10249 - Environmental Impact Statement: Will and Kankakee Counties, IL and Lake County, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... design concepts. Alternatives to be evaluated will include (1) taking no action and (2) evaluating... design issues in a way that does not materially increase overall impacts. The primary environmental... or design options within the selected corridor, financing options, and construction sequencing...
Environmental Impact Statement (EIS) is a document prepared to describe the effects for proposed activities on federal government to evaluate the effects of its actions on the environment and to consider alternative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2011-09-01
The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less
Environmental Assessment: Proposed Consolidated Warehouse, Hill Air Force Base, Utah
2011-02-01
can be evaluated. It...420 916 180 243 50 3 37 206 50 7 G 43 91 5 508 57 0 47 0 847 896 341 50 5 5 39 50 9 24 0 58 1 5 16 42 849 13 77 883 C 295 840 430 125 U -01-HL- 0164m U ...91-WC-687m U -95-WC-28OP U -02-HL-0008m Proposed Action (Alternative A) Future Training Complex Alternate Location (Alternative D) Fu tu re Au to m
McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A
2018-01-01
This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives, and should be applied to complex remediation projects to aid environmental decision making. Integr Environ Assess Manag 2018;14:22-31. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
Nuclear deposturing and US public opinion. Master's thesis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinote, S.C.
USSTRATCOM is currently developing a rational framework for evaluating deposturing alternatives that range from distancing the 'nuclear football' from the President to storing land-based ICBM's away from their soils. One of the areas that may be considered by USSTRATCOM when evaluating these alternatives is the political feasibility of implementing different alternatives. An important determinant of this political feasibility is domestic public opinion, as it can encourage or constrain the actions of the elected officials who are directly accountable to the people. This Policy Analysis Exercise helps USSTRATCOM take public opinion into account in the analysis by considering the views thatmore » U.S. citizens hold on defense issues and recommending how these views should be included in the evaluation of different deposturing measures.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to bemore » major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental Impacts. The range of environmental impacts, beneficial and adverse, are described for the proposed action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. A brief description of permits and regulatory requirements for the proposed action is provided. (7) Organizations Consulted. Any outside agencies, groups, or individuals contacted as part of environmental assessment documentation preparation are listed. (8) References. Documents used to provide information or data are listed. The appendices contain additional information necessary to support an understanding of the proposed action, alternatives, and potential impacts is provided. Comments resulting from review of the environmental assessment by states and tribes or other stakeholders and the response to those comments will be included in the appendices.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
..., the NPS undertook an evaluative process to consider a number of management actions that could be... decision-making. Both alternatives would employ a collaborative research and monitoring program (10-year...
Driver-vehicle effectiveness model : volume II : appendices
DOT National Transportation Integrated Search
1978-12-01
The Driver-Vehicle Effectiveness Model (DRIVEM) is a Monte Carlo simulation model intended for use by NHTSA to evaluate alternative vehicle subsystems or effects of legislative actions proposed to reduce the probability and severity of highway traffi...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2003-08-06
This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less
Grizzly Substation Fiber Optics : Environmental Assessment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1998-02-01
This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affectingmore » the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).« less
Codeine and its alternates for pain and cough relief*
Eddy, Nathan B.; Friebel, Hans; Hahn, Klaus-Jürgen; Halbach, Hans
1968-01-01
This report—the first of a series on codeine and its alternates for pain and cough relief—presents a detailed evaluation of experimental and clinical data concerning the analgesic action of codeine (the antitussive action will be assessed separately). The authors discuss the pharmacology of the drug, including side-effects and toxicity; effects on the respiratory, circulatory, digestive and urinary systems; tolerance, dependence and liability to abuse; metabolic effects; and mechanism of action. Though codeine is generally more toxic than morphine to animals on account of its convulsant action, it is less toxic to man, possibly because it produces less respiratory depression. Again, tolerance to its analgesic effects has been demonstrated in several animal species, but dependence in man is observed far less frequently than it is with morphine, and the abstinence syndrome is less intense. From their extensive review of the evidence available, the authors conclude that codeine is a good analgesic and that little risk to public health is likely to arise from its clinical use to relieve pain. PMID:4972938
Action Memorandum for Decommissioning of TAN-607 Hot Shop Area
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. A. Pinzel
The Department of Energy is documenting the selection of an alternative for the TAN-607 Hot Shop Area using a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA). The scope of the removal action is limited to TAN-607 Hot Shop Area. An engineering evaluation/cost analysis (EE/CA) has assisted the Department of Energy Idaho Operations Office in identifuomg the most effective method for performing the decommissioning of this structure whose mission has ended. TAN-607 Hot Shop Area is located at Test Area North Technical Support Facility within the Idaho National Laboratory Site. The selected alternative consists of demolishing themore » TAN-607 aboveground structures and components, removing belowground noninert components (e.g. wood products), and removing the radiologically contaminated debris that does not meet remedial action objectives (RAOs), as defined in the Record of Decision Amendment for the V-Tanks and Explanation of Significant Differences for the PM-2A Tanks at Test Area North, Operable Unit 1-10.« less
GUIDED TOUR OF A WEB-BASED ENVIRONMENTAL DECISION TOOLKIT
Decision-making regarding the targeting of vulnerable resources and prioritization of actions requires synthesis of data on condition, vulnerability, and feasibility of risk management alternatives. EP A's Regional Vulnerability Assessment (ReV A) Program has evaluated existing a...
Signature project 1B-integrated land-use, transportation and environmental modeling.
DOT National Transportation Integrated Search
2014-05-01
Land use and transportation are inextricably linked. Models that capture the dynamics and interactions of both systems are indispensable for evaluating alternative courses of action in policy and investment. These models must be spatially disaggregat...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
On June 1, 1995, DOE issued a Record of Decision [60 Federal Register 28680] for the Department-wide management of spent nuclear fuel (SNF); regionalized storage of SNF by fuel type was selected as the preferred alternative. The proposed action evaluated in this environmental assessment is the management of SNF on the Oak Ridge Reservation (ORR) to implement this preferred alternative of regional storage. SNF would be retrieved from storage, transferred to a hot cell if segregation by fuel type and/or repackaging is required, loaded into casks, and shipped to off-site storage. The proposed action would also include construction and operationmore » of a dry cask SNF storage facility on ORR, in case of inadequate SNF storage. Action is needed to enable DOE to continue operation of the High Flux Isotope Reactor, which generates SNF. This report addresses environmental impacts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24more » (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
..., Maryland. The ROD identifies that Alternative 2: Dispersed Density Action Alternative, as defined in the...: Implement Alternative 2: Dispersed Density Action Alternative. This alternative includes the following: (1...
Strategic decision making under climate change: a case study on Lake Maggiore water system
NASA Astrophysics Data System (ADS)
Micotti, M.; Soncini Sessa, R.; Weber, E.
2014-09-01
Water resources planning processes involve different kinds of decisions that are generally evaluated under a stationary climate scenario assumption. In general, the possible combinations of interventions are mutually compared as single alternatives. However, the ongoing climate change requires us to reconsider this approach. Indeed, what have to be compared are not individual alternatives, but families of alternatives, characterized by the same structural decisions, i.e. by actions that have long-term effects and entail irrevocable changes in the system. The rationale is that the structural actions, once they have been implemented, cannot be easily modified, while the management decisions can be adapted to the evolving conditions. This paper considers this methodological problem in a real case study, in which a strategic decision has to be taken: a new barrage was proposed to regulate Lake Maggiore outflow, but, alternatively, either the present barrage can be maintained with its present regulation norms or with a new one. The problem was dealt with by multi-criteria decision analysis involving many stakeholders and two decision-makers. An exhaustive set of indicators was defined in the participatory process, conducted under the integrated water resource management paradigm, and many efficient (in Pareto sense) regulation policies were identified. The paper explores different formulations of a global index to evaluate and compare the effectiveness of the classes of alternatives under both stationary and changing hydrological scenarios in order to assess their adaptability to the ongoing climate change.
NASA Technical Reports Server (NTRS)
Mayo, L. H.
1972-01-01
The implications are explored of the specific decision context approach to anticipatory project assessment. More specifically, it is hypothesized that with respect to any given effect of a proposed project or action (mobility, job opportunities, air pollution, population distribution, etc.) such effect will likely differ in probability and/or magnitude from one decisional context to another; that the social desirability or undesirability of a given effect is a function (will differ with) each specific decisional context; that therefore the social impact of such effect will in all likelihood differ with each specific decisional context; and that the social significance of even the dame social impact of a given effect will vary from one decisional context to another when such social impact interacts with (competes with or reinforces) the social impacts of other effects. It also follows from this analysis that the respective roles of scientific method (demonstrable data) and adversarial system will not only differ with each specific decisional context but with each alternative course of action available to the decisional entity in each specific context.
22 CFR 216.6 - Environmental assessments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal and its alternatives in comparative form, thereby sharpening the issues and providing a clear... including the proposed action so that reviewers may evaluate their comparative merits; include the... and mitigation measures; urban quality; historic and cultural resources and the design of the built...
22 CFR 216.6 - Environmental assessments.
Code of Federal Regulations, 2011 CFR
2011-04-01
... proposal and its alternatives in comparative form, thereby sharpening the issues and providing a clear... including the proposed action so that reviewers may evaluate their comparative merits; include the... and mitigation measures; urban quality; historic and cultural resources and the design of the built...
22 CFR 216.6 - Environmental assessments.
Code of Federal Regulations, 2013 CFR
2013-04-01
... proposal and its alternatives in comparative form, thereby sharpening the issues and providing a clear... including the proposed action so that reviewers may evaluate their comparative merits; include the... and mitigation measures; urban quality; historic and cultural resources and the design of the built...
22 CFR 216.6 - Environmental assessments.
Code of Federal Regulations, 2012 CFR
2012-04-01
... proposal and its alternatives in comparative form, thereby sharpening the issues and providing a clear... including the proposed action so that reviewers may evaluate their comparative merits; include the... and mitigation measures; urban quality; historic and cultural resources and the design of the built...
22 CFR 216.6 - Environmental assessments.
Code of Federal Regulations, 2014 CFR
2014-04-01
... proposal and its alternatives in comparative form, thereby sharpening the issues and providing a clear... including the proposed action so that reviewers may evaluate their comparative merits; include the... and mitigation measures; urban quality; historic and cultural resources and the design of the built...
DOT National Transportation Integrated Search
2014-05-01
Land use and transportation are inextricably linked. Models that capture the dynamics and interactions : of both systems are indispensable for evaluating alternative courses of action in policy and investment. : These models must be spatially disaggr...
Code of Federal Regulations, 2014 CFR
2014-07-01
... practices based on clearly identified intended outcomes and monitoring to determine if management actions... those outcomes are met or re-evaluated. Adaptive management stems from the recognition that knowledge... the least harm to the biological and physical environment; it also is the alternative which best...
Code of Federal Regulations, 2013 CFR
2013-07-01
... practices based on clearly identified intended outcomes and monitoring to determine if management actions... those outcomes are met or re-evaluated. Adaptive management stems from the recognition that knowledge... the least harm to the biological and physical environment; it also is the alternative which best...
Code of Federal Regulations, 2012 CFR
2012-07-01
... practices based on clearly identified intended outcomes and monitoring to determine if management actions... those outcomes are met or re-evaluated. Adaptive management stems from the recognition that knowledge... the least harm to the biological and physical environment; it also is the alternative which best...
Code of Federal Regulations, 2011 CFR
2011-07-01
... practices based on clearly identified intended outcomes and monitoring to determine if management actions... those outcomes are met or re-evaluated. Adaptive management stems from the recognition that knowledge... the least harm to the biological and physical environment; it also is the alternative which best...
2010-09-01
Operations and Procedures • Logistics and Facilities • Training • Exercises, Evaluation and Corrective Actions • Crisis Communications ...Assessment Team BCA Benefit-cost analysis CEO Chief Executive Officer CERT Community Emergency Response Team CFR Code of Federal Regulations...CHDS Center for Homeland Defense and Security CPG 101 Comprehensive Preparedness Guidelines 101 CPP Community Preparedness and Participation CPW
Developing a Methodology for Risk-Informed Trade-Space Analysis in Acquisition
2015-01-01
73 6.10. Research, Development, Test, and Evaluation Cost Distribution, Technology 1 Mitigation of...6.11. Research, Development, Test, and Evaluation Cost Distribution, Technology 3 Mitigation of the Upgrade Alternative...courses of action, or risk- mitigation behaviors, which take place in the event that the technology is not developed by the mile- stone date (e.g
ERIC Educational Resources Information Center
Mackey, Eleanor Race; La Greca, Annette M.
2008-01-01
Based on the Theory of Reasoned Action, this study evaluated a "socialization" model linking girls' peer crowd affiliations (e.g., Jocks, Populars) with their own weight concern, perceived peer weight norms, and weight control behaviors. An alternative "selection" model was also evaluated. Girls (N = 236; M age = 15.95 years) from diverse ethnic…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krause
2010-08-01
This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less
10 CFR 490.502 - Creditable actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Creditable actions. 490.502 Section 490.502 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fueled Vehicle Credit Program § 490.502 Creditable actions. A fleet or covered person becomes entitled to alternative...
10 CFR 490.502 - Creditable actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Creditable actions. 490.502 Section 490.502 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fueled Vehicle Credit Program § 490.502 Creditable actions. A fleet or covered person becomes entitled to alternative...
10 CFR 490.502 - Creditable actions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Creditable actions. 490.502 Section 490.502 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fueled Vehicle Credit Program § 490.502 Creditable actions. A fleet or covered person becomes entitled to alternative...
10 CFR 490.502 - Creditable actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Creditable actions. 490.502 Section 490.502 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fueled Vehicle Credit Program § 490.502 Creditable actions. A fleet or covered person becomes entitled to alternative...
10 CFR 490.502 - Creditable actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Creditable actions. 490.502 Section 490.502 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fueled Vehicle Credit Program § 490.502 Creditable actions. A fleet or covered person becomes entitled to alternative...
Application of Adverse Outcome Pathways to U.S. EPA’s Endocrine Disruptor Screening Program
Noyes, Pamela D.; Casey, Warren M.; Dix, David J.
2017-01-01
Background: The U.S. EPA’s Endocrine Disruptor Screening Program (EDSP) screens and tests environmental chemicals for potential effects in estrogen, androgen, and thyroid hormone pathways, and it is one of the only regulatory programs designed around chemical mode of action. Objectives: This review describes the EDSP’s use of adverse outcome pathway (AOP) and toxicity pathway frameworks to organize and integrate diverse biological data for evaluating the endocrine activity of chemicals. Using these frameworks helps to establish biologically plausible links between endocrine mechanisms and apical responses when those end points are not measured in the same assay. Results: Pathway frameworks can facilitate a weight of evidence determination of a chemical’s potential endocrine activity, identify data gaps, aid study design, direct assay development, and guide testing strategies. Pathway frameworks also can be used to evaluate the performance of computational approaches as alternatives for low-throughput and animal-based assays and predict downstream key events. In cases where computational methods can be validated based on performance, they may be considered as alternatives to specific assays or end points. Conclusions: A variety of biological systems affect apical end points used in regulatory risk assessments, and without mechanistic data, an endocrine mode of action cannot be determined. Because the EDSP was designed to consider mode of action, toxicity pathway and AOP concepts are a natural fit. Pathway frameworks have diverse applications to endocrine screening and testing. An estrogen pathway example is presented, and similar approaches are being used to evaluate alternative methods and develop predictive models for androgen and thyroid pathways. https://doi.org/10.1289/EHP1304 PMID:28934726
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-05-01
Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
1999-02-11
This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Findingmore » of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.« less
49 CFR Attachment 1 - Form and Content of Statement
Code of Federal Regulations, 2010 CFR
2010-10-01
... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
49 CFR Attachment 1 - Form and Content of Statement
Code of Federal Regulations, 2011 CFR
2011-10-01
... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
DOT National Transportation Integrated Search
2010-07-01
Land use and transportation are inextricably linked. Models that capture the dynamics and interactions of both systems are indispensable for evaluating alternative courses of action in policy and investment. These models must be spatially disaggregat...
Evaluation of the relative risk to birds of alternative pesticides using EPA’s TIM/MCnest Model
Agricultural producers today have many choices of active ingredients for crop protection. These products come with different active ingredients, different modes of action, and that initiate different adverse outcome pathways. Use patterns also differ considerably among products...
32 CFR 651.50 - Public interaction phase.
Code of Federal Regulations, 2011 CFR
2011-07-01
... various environmental disciplines, in any technical area where foreseen impacts are not already... enable evaluation of the range of impacts that may be caused by the proposed action and alternatives. The... identification of “any public environmental assessments and other environmental impact statements that are being...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Cul, G.D.
1991-02-01
The Paducah Gaseous Diffusion Plant C-400 Decontamination Facility generators aqueous solutions that originate in drum washing, machine parts and equipment cleaning, and other decontamination processes. In general, the waste contains uranyl, fluoride, carbonate, and nitrate ions, in addition to soaps, detergents, secondary contaminants, and particulate matter. The main contaminants are fluoride, technetium, uranium, and other heavy metals. In accordance with Department of Energy (DOE) Order 5400.5, the releases of radioactive materials must be as low as reasonably achievable and be below the derived concentration guide limits. To comply with the DOE order, an action plan was formulated. The action planmore » included a literature search to support best available technology evaluation of treatment alternatives, a quality assurance/quality control plan, suggestion of alternative treatment options, bench-scale test studies of the proposed treatment alternatives, and establishment of the final recommendation. Five major technologies were considered: precipitation/coprecipitation, reverse osmosis, ultrafiltration, supported liquid membranes, and ion exchange. Biosorption was also briefly considered. Based on C-400's requirements and facilities, the precipitation/coprecipitation process appears to be the best suited for use at the plant. Four different treatment options using the precipitation/coprecipitation technology were proposed. Bench-scale studies of all four options were suggested. Options 1 and 2 represent a combination of lime-softening and iron coprecipitation. Laboratory test evaluations were initiated and the results involving Options 1 and 2 reported here. 29 refs., 1 fig., 2 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastesmore » for disposal.« less
Discrepancies between Judgment and Choice of Action in Moral Dilemmas
Tassy, Sébastien; Oullier, Olivier; Mancini, Julien; Wicker, Bruno
2013-01-01
Everyone has experienced the potential discrepancy between what one judges as morally acceptable and what one actually does when a choice between alternative behaviors is to be made. The present study explores empirically whether judgment and choice of action differ when people make decisions on dilemmas involving moral issues. Two hundred and forty participants evaluated 24 moral and non-moral dilemmas either by judging (“Is it acceptable to…”) or reporting the choice of action they would make (“Would you do…”). We also investigated the influence of varying the number of people benefiting from the decision and the closeness of relationship of the decision maker with the potential victim on these two types of decision. Variations in the number of beneficiaries from the decision did not influence judgment nor choice of action. By contrast, closeness of relationship with the victim had a greater influence on the choice of action than on judgment. This differentiation between evaluative judgments and choices of action argues in favor of each of them being supported by (at least partially) different psychological processes. PMID:23720645
49 CFR Attachment 1 to Part 520 - Form and Content of Statement
Code of Federal Regulations, 2012 CFR
2012-10-01
... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
49 CFR Attachment 1 to Part 520 - Form and Content of Statement
Code of Federal Regulations, 2014 CFR
2014-10-01
... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
49 CFR 520.34 - Comments on environmental statements prepared by other agencies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
49 CFR Attachment 1 to Part 520 - Form and Content of Statement
Code of Federal Regulations, 2013 CFR
2013-10-01
... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
49 CFR 520.34 - Comments on environmental statements prepared by other agencies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...
Unique challenges facing Southwestern tribes: Chapter 17
Hiza, Margaret; Chief, Karletta; Bemis, Kirk; Gautam, Mahesh; Middleton, Beth Rose; Tsosie, Rebecca
2013-01-01
•\tTribes are taking action to address climate change by instituting climate-change mitigation initiatives, including utility-scale, alternative-energy projects, and energy-conservation projects. Tribes are also evaluating their existing capacity to engage in effective adaptation planning, even though financial and social capital is limited.
78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...
Pharmacological interventions to treat phlebitis: systematic review.
dos Reis, Paula Elaine Diniz; Silveira, Renata Cristina de Campos Pereira; Vasques, Christiane Inocêncio; de Carvalho, Emilia Campos
2009-01-01
This study presents a systematic review for evaluating effective pharmacological actions for the treatment of phlebitis stemming from infusion therapy. The studies reviewed were categorized according to the type of therapeutic approach proposed by the author and by the level of evidence presented. The review found that topical nitroglycerin and notoginseny were more effective in the reduction of the inflammatory process when compared with other proposed alternatives. Nevertheless, the development of research related to possible alternatives for the treatment of phlebitis is important.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-19
... the availability of the Record of Decision (ROD) for the General Management Plan/Wilderness Study (GMP... and development of the national monument in the GMP/WS/ FEIS, Alternative A--no action Alternative, and two action Alternatives. The preferred alternative (Alternative B) from the GMP/ WS/FEIS [[Page...
Textile Visual Materials: Appropriate Technology in Action.
ERIC Educational Resources Information Center
Donoghue, Beverly Emerson
An innovative educational medium--screenprinted visual aids on cloth--is one alternative to conventional media in Africa, where visual materials are important communication tools but conventional media and materials are often scarce. A production process for cloth visual aids was developed and evaluated in Ghana and Sudan through the…
De Anza Summer College "By the Sea"; Evaluation Report, 1974.
ERIC Educational Resources Information Center
College of the Redwoods, Eureka, CA.
This report describes an off-campus alternative to traditional summer school sponsored by De Anza College and College of the Redwoods (California). Three twelve-day, concentrated summer programs, called "Action Learning Modules", utilized an interdisciplinary approach. The first module combined oceanography, marine biology, and scuba diving. A…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
... local, state, and regional newspapers, six online media outlets, and two local radio networks. Copies of... Atchafalaya; The Nature Conservancy; Gulf Restoration Network; Atchafalaya Basinkeeper; Louisiana Crawfish... Environmental Action Network; and local citizens. Selected Alternative The Draft CCP/EA identified and evaluated...
Computer models for economic and silvicultural decisions
Rosalie J. Ingram
1989-01-01
Computer systems can help simplify decisionmaking to manage forest ecosystems. We now have computer models to help make forest management decisions by predicting changes associated with a particular management action. Models also help you evaluate alternatives. To be effective, the computer models must be reliable and appropriate for your situation.
Benjamin, Joseph R.; Bellmore, J. Ryan; Dombroski, Daniel
2018-01-29
With the decline of Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss), habitat restoration actions in freshwater tributaries have been implemented to improve conditions for juveniles. Typically, physical (for example, hydrologic and engineering) based models are used to design restoration alternatives with the assumption that biological responses will be improved with changes to the physical habitat. Biological models rarely are used. Here, we describe simulations of a food web model, the Aquatic Trophic Productivity (ATP) model, to aid in the design of a restoration project in the Methow River, north-central Washington. The ATP model mechanistically links environmental conditions of the stream to the dynamics of river food webs, and can be used to simulate how alternative river restoration designs influence the potential for river reaches to sustain fish production. Four restoration design alternatives were identified that encompassed varying levels of side channel and floodplain reconnection and large wood addition. Our model simulations suggest that design alternatives focused on reconnecting side channels and the adjacent floodplain may provide the greatest increase in fish capacity. These results were robust to a range of discharge and thermal regimes that naturally occur in the Methow River. Our results suggest that biological models, such as the ATP model, can be used during the restoration planning phase to increase the effectiveness of restoration actions. Moreover, the use of multiple modeling efforts, both physical and biological, when evaluating restoration design alternatives provides a better understanding of the potential outcome of restoration actions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-11-01
Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.555 million tons of tailings at the Durango site constitutesmore » the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from vegetative stabilization (Option I), to contouring and stabilizing in-place with varying depths of cover material (Options II and III), to removal to an isolated long-term disposal site (Options V to VIII). All options include remedial action costs for offsite locations where tailings have been placed. Costs estimated for the eight options range from $4,340,000 to $13,590,000. Reprocessing the tailings for uranium is sufficiently economically attractive to justify reprocessing in conjunction with each of the options.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-11-01
Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.555 million tons of tailings at the Durango site constitutesmore » the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from vegetative stabilization (Option I), to contouring and stabilizing in-place with varying depths of cover material (Options II and III), to removal to an isolated long-term disposal site (Options V to VIII). All options include remedial action costs for offsite locations where tailings have been placed. Costs estimated for the eight options range from $4,340,000 to $13,590,000. Reprocessing the tailings for uranium is sufficiently economically attractive to justify reprocessing in conjunction with each of the options.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks contain trichloroethane and 1,4-dichlorobenzene above ''Resource Conservation and Recovery Act'' toxicity characteristic limits. Based on the evaluation of analytical data from the CAI, review of future and current operations at the eight CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 151. No Further Action is the recommended corrective action for soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 18-03-01, and 18-99-09; and Lagoons C, D, F, and G of CAS 12-03-01. No Further Action with implementation of a best management practice (BMP) is recommended for soils at CAS 12-47-01 and Lagoons B and E of CAS 12-03-01. To be protective of future workers should the present scenario used to calculate FALs change, an administrative use restriction will be recorded per the FFACO agreement as a BMP. Close in Place with Administrative Controls is the recommended corrective action for Lagoon A of CAS 12-03-01. Based on the evaluation of analytical data from the CAI; review of future and current operations at CASs 12-04-01, 12-04-02, and 12-04-03; and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for the septic tanks at these CASs. No Further Action with implementation of BMPs is the recommended corrective action for septic tanks that do not contain potential source material from CAS 12-04-01, System No.4 (four tanks); CAS 12-04-02, System No.5 (six tanks); and CAS 12-04-03, System No.3 (four tanks). Clean Closure with implementation of BMPs is the recommended corrective action for the septic tanks from CAS 12-04-01, System No.1 (two tanks). The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 151.« less
Economic viability of access broadband multiservice networks
NASA Astrophysics Data System (ADS)
Castelli, Francesco; Dammicco, Giacinto; Mocci, Ugo
1995-02-01
In this paper the economic viability of alternative architectures for optical access networks providing broad band services to different subscriber classes in a metropolitan environment, is investigated by a specific tool, NEVE (Network Economic Viability Evaluator), developed for broad band multiservice network planning, service evolutionary scenarios assessment, evaluation of tariff strategies and other actions taken at stimulating the demand growth. As the viability target can be achieved in different ways, different studies can be carried out by NEVE. In the paper some of them are discussed, particularly the ones addressed: to evaluate the impact on viability of alternative service scenarios; to determine the critical mass of broad band subscribers and the critical joint service adoption cost; to evaluate cross subsidiary policies among different subscriber classes and services; to perform sensitivity analysis with respect to variations of demand parameters and tariffs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wickline, Alfred
2004-04-01
This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 204 Storage Bunkers, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE); and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) north of Las Vegas, Nevada (Figure 1-1). The Corrective Action Sites (CASs) within CAU 204 are located in Areas 1, 2, 3, and 5 of the NTS, in Nye County, Nevada (Figure 1-2). Corrective Action Unit 204 ismore » comprised of the six CASs identified in Table 1-1. As shown in Table 1-1, the FFACO describes four of these CASs as bunkers one as chemical exchange storage and one as a blockhouse. Subsequent investigations have identified four of these structures as instrumentation bunkers (CASs 01-34-01, 02-34-01, 03-34-01, 05-33-01), one as an explosives storage bunker (CAS 05-99-02), and one as both (CAS 05-18-02). The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activities conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less
Christopoulos, Vassilios; Bonaiuto, James; Andersen, Richard A.
2015-01-01
Decision making is a vital component of human and animal behavior that involves selecting between alternative options and generating actions to implement the choices. Although decisions can be as simple as choosing a goal and then pursuing it, humans and animals usually have to make decisions in dynamic environments where the value and the availability of an option change unpredictably with time and previous actions. A predator chasing multiple prey exemplifies how goals can dynamically change and compete during ongoing actions. Classical psychological theories posit that decision making takes place within frontal areas and is a separate process from perception and action. However, recent findings argue for additional mechanisms and suggest the decisions between actions often emerge through a continuous competition within the same brain regions that plan and guide action execution. According to these findings, the sensorimotor system generates concurrent action-plans for competing goals and uses online information to bias the competition until a single goal is pursued. This information is diverse, relating to both the dynamic value of the goal and the cost of acting, creating a challenging problem in integrating information across these diverse variables in real time. We introduce a computational framework for dynamically integrating value information from disparate sources in decision tasks with competing actions. We evaluated the framework in a series of oculomotor and reaching decision tasks and found that it captures many features of choice/motor behavior, as well as its neural underpinnings that previously have eluded a common explanation. PMID:25803729
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beranich, S.J.
1994-08-24
This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less
Neural correlates of the divergence of instrumental probability distributions.
Liljeholm, Mimi; Wang, Shuo; Zhang, June; O'Doherty, John P
2013-07-24
Flexible action selection requires knowledge about how alternative actions impact the environment: a "cognitive map" of instrumental contingencies. Reinforcement learning theories formalize this map as a set of stochastic relationships between actions and states, such that for any given action considered in a current state, a probability distribution is specified over possible outcome states. Here, we show that activity in the human inferior parietal lobule correlates with the divergence of such outcome distributions-a measure that reflects whether discrimination between alternative actions increases the controllability of the future-and, further, that this effect is dissociable from those of other information theoretic and motivational variables, such as outcome entropy, action values, and outcome utilities. Our results suggest that, although ultimately combined with reward estimates to generate action values, outcome probability distributions associated with alternative actions may be contrasted independently of valence computations, to narrow the scope of the action selection problem.
Neural Correlates of the Divergence of Instrumental Probability Distributions
Wang, Shuo; Zhang, June; O'Doherty, John P.
2013-01-01
Flexible action selection requires knowledge about how alternative actions impact the environment: a “cognitive map” of instrumental contingencies. Reinforcement learning theories formalize this map as a set of stochastic relationships between actions and states, such that for any given action considered in a current state, a probability distribution is specified over possible outcome states. Here, we show that activity in the human inferior parietal lobule correlates with the divergence of such outcome distributions–a measure that reflects whether discrimination between alternative actions increases the controllability of the future–and, further, that this effect is dissociable from those of other information theoretic and motivational variables, such as outcome entropy, action values, and outcome utilities. Our results suggest that, although ultimately combined with reward estimates to generate action values, outcome probability distributions associated with alternative actions may be contrasted independently of valence computations, to narrow the scope of the action selection problem. PMID:23884955
Cost-effective conservation of an endangered frog under uncertainty.
Rose, Lucy E; Heard, Geoffrey W; Chee, Yung En; Wintle, Brendan A
2016-04-01
How should managers choose among conservation options when resources are scarce and there is uncertainty regarding the effectiveness of actions? Well-developed tools exist for prioritizing areas for one-time and binary actions (e.g., protect vs. not protect), but methods for prioritizing incremental or ongoing actions (such as habitat creation and maintenance) remain uncommon. We devised an approach that combines metapopulation viability and cost-effectiveness analyses to select among alternative conservation actions while accounting for uncertainty. In our study, cost-effectiveness is the ratio between the benefit of an action and its economic cost, where benefit is the change in metapopulation viability. We applied the approach to the case of the endangered growling grass frog (Litoria raniformis), which is threatened by urban development. We extended a Bayesian model to predict metapopulation viability under 9 urbanization and management scenarios and incorporated the full probability distribution of possible outcomes for each scenario into the cost-effectiveness analysis. This allowed us to discern between cost-effective alternatives that were robust to uncertainty and those with a relatively high risk of failure. We found a relatively high risk of extinction following urbanization if the only action was reservation of core habitat; habitat creation actions performed better than enhancement actions; and cost-effectiveness ranking changed depending on the consideration of uncertainty. Our results suggest that creation and maintenance of wetlands dedicated to L. raniformis is the only cost-effective action likely to result in a sufficiently low risk of extinction. To our knowledge we are the first study to use Bayesian metapopulation viability analysis to explicitly incorporate parametric and demographic uncertainty into a cost-effective evaluation of conservation actions. The approach offers guidance to decision makers aiming to achieve cost-effective conservation under uncertainty. © 2015 Society for Conservation Biology.
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2013 CFR
2013-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2014 CFR
2014-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2012 CFR
2012-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
76 FR 40674 - Fisheries of the Exclusive Economic Zone Off Alaska; Scallops
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
...-XA421 Fisheries of the Exclusive Economic Zone Off Alaska; Scallops AGENCY: National Marine Fisheries... July 26, 1995. The scallop fisheries in the U.S exclusive economic zone off Alaska are jointly managed... alternatives evaluated to address this action, and the environmental, social, and economic impacts of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... project, GSA proposes to relocate its current operations from the Bannister Federal Complex in Kansas City... increment financing (TIF) district, on the East-side of downtown, in Missouri's 5th Congressional District... the proposed project. GSA will also evaluate the ``No Action'' and other reasonable alternatives to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...
10 CFR 51.45 - Environmental report.
Code of Federal Regulations, 2012 CFR
2012-01-01
... impact of the proposed action on the environment. Impacts shall be discussed in proportion to their... concerning alternative uses of available resources.” To the extent practicable, the environmental impacts of... impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
Environmental Assessment: Clear Zone and Accident Potential Zone Selective Tree Removal
2011-05-25
PROPOSED ACTION The Proposed Action would occur within the CZ and APZs north and south of the runway. The overall area is undeveloped wetland and...existing runway. Therefore, there is no practicable alternative to conducting the action in floodplain/ wetland areas. Three technical alternatives for...or removal would be required. Alternative 3 was eliminated because leaving woody debris in wetlands would not meet U.S. Army Corps of Engineers
Nevada Training Initiative Environmental Assessment
2003-07-01
ALTERNA TIVES The U.S. Air Force. Headquarters Air Combat Command (ACC) proposes t o construct a Military Operations in Urban Terrain (MOUT) Training...facilities along with upgrades of existing fncilities. The MOUT wou ld encompass approximately 97 acres, with construction phased O \\’er a 5-year period...action alternatives and the no- action alternative. Both action alternatives arc located in the South Range o fN1TR and propose placing the MOUT
2011-06-29
Action and Alternatives 9 2.5 Identification of the Preferred Action 10 3.0 AFFECTED ENVIRONMENT 13 3.1 New Boston Air Force Station 13 3.1.1 Air...the alternative actions is presented in Section 2.4. Finally, identification of the Preferred Action is presented in Section 2.5. 2.1 PROPOSED...presented in Chapter 4.0 of this EA. 2.5 IDENTIFICATION OF THE PREFERRED ACTION The USAF’s Preferred Action is to implement the Proposed Action at
Alternatives Analysis for the Resumption of Transient Testing Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee Nelson
2013-11-01
An alternatives analysis was performed for resumption of transient testing. The analysis considered eleven alternatives – including both US international facilities. A screening process was used to identify two viable alternatives from the original eleven. In addition, the alternatives analysis includes a no action alternative as required by the National Environmental Policy Act (NEPA). The alternatives considered in this analysis included: 1. Restart the Transient Reactor Test Facility (TREAT) 2. Modify the Annular Core Research Reactor (ACRR) which includes construction of a new hot cell and installation of a new hodoscope. 3. No Action
Phase I and II feasibility study report for the 300-FF-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1993-12-31
The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phasemore » III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.« less
Reduced Mu Power in Response to Unusual Actions Is Context-Dependent in 1-Year-Olds
Langeloh, Miriam; Buttelmann, David; Matthes, Daniel; Grassmann, Susanne; Pauen, Sabina; Hoehl, Stefanie
2018-01-01
During social interactions infants predict and evaluate other people’s actions. Previous behavioral research found that infants’ imitation of others’ actions depends on these evaluations and is context-dependent: 1-year-olds predominantly imitated an unusual action (turning on a lamp with one’s forehead) when the model’s hands were free compared to when the model’s hands were occupied or restrained. In the present study, we adapted this behavioral paradigm to a neurophysiological study measuring infants’ brain activity while observing usual and unusual actions via electroencephalography. In particular, we measured differences in mu power (6 – 8 Hz) associated with motor activation. In a between-subjects design, 12- to 14-month-old infants watched videos of adult models demonstrating that their hands were either free or restrained. Subsequent test frames showed the models turning on a lamp or a soundbox by using their head or their hand. Results in the hands-free condition revealed that 12- to 14-month-olds displayed a reduction of mu power in frontal regions in response to unusual and thus unexpected actions (head touch) compared to usual and expected actions (hand touch). This may be explained by increased motor activation required for updating prior action predictions in response to unusual actions though alternative explanations in terms of general attention or cognitive control processes may also be considered. In the hands-restrained condition, responses in mu frequency band did not differ between action outcomes. This implies that unusual head-touch actions compared to hand-touch actions do not necessarily evoke a reduction of mu power. Thus, we conclude that reduction of mu frequency power is context-dependent during infants’ action perception. Our results are interpreted in terms of motor system activity measured via changes in mu frequency band as being one important neural mechanism involved in action prediction and evaluation from early on. PMID:29441034
A behavioural and neural evaluation of prospective decision-making under risk
Symmonds, Mkael; Bossaerts, Peter; Dolan, Raymond J.
2010-01-01
Making the best choice when faced with a chain of decisions requires a person to judge both anticipated outcomes and future actions. Although economic decision-making models account for both risk and reward in single choice contexts there is a dearth of similar knowledge about sequential choice. Classical utility-based models assume that decision-makers select and follow an optimal pre-determined strategy, irrespective of the particular order in which options are presented. An alternative model involves continuously re-evaluating decision utilities, without prescribing a specific future set of choices. Here, using behavioral and functional magnetic resonance imaging (fMRI) data, we studied human subjects in a sequential choice task and use these data to compare alternative decision models of valuation and strategy selection. We provide evidence that subjects adopt a model of re-evaluating decision utilities, where available strategies are continuously updated and combined in assessing action values. We validate this model by using simultaneously-acquired fMRI data to show that sequential choice evokes a pattern of neural response consistent with a tracking of anticipated distribution of future reward, as expected in such a model. Thus, brain activity evoked at each decision point reflects the expected mean, variance and skewness of possible payoffs, consistent with the idea that sequential choice evokes a prospective evaluation of both available strategies and possible outcomes. PMID:20980595
Obtaining A Degree: Alternative Options for Re-Entry Women. Field Evaluation Draft.
ERIC Educational Resources Information Center
Fisher-Thompson, Jeanne
Problems and barriers that women often face when re-entering the higher educational system are identified, and ways in which institutions can be more responsive to re-entry students are suggested. A wide range of possible actions is included so that institutions can pursue those most appropriate to their individual circumstances. Definitions are…
Estimation of the relative influence of climate change, compared to other human activities, on dynamics of Pacific salmon (Oncorhynchus spp.) populations can help management agencies take appropriate management actions. We used empirically based simulation modelling of 48 sockeye...
Environmenal analysis of the Bayo Canyon (TA-10) Site, Los Alamos, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferenbaugh, R.W.; Buhl, T.E.; Stoker, A.K.
1982-05-01
The radiological survey of the old TA-10 site in Bayo Canyon found low levels of surface contamination in the vicinity of the firing sites and subsurface contamination in the old waste disposal area. The three alternatives proposed for the site are: (1) to take no action; (2) to restrict usage of the area of subsurface contamination to activities that cause no subsurface disturbance (minimal action); and (3) to remove the subsurface conamination to levels below the working criteria. Dose calculations indicate that doses from surface contamination for recreational users of the canyon, permanent residents, and construction workers and doses formore » workers involved in excavation of contaminated soil under the clean up alternative are only small percentages of applicable guidelines. No environmental impacts are associated with either the no-action or minimal action alternatives. The impact associated with the cleanup alternative is small, especially considering that the area already has been affected by the original TA-10 decommissioning action, but nevertheless, the preferred alternative is the minimal action alternative, where 0.6 hectare of land is restricted to surface activities. This leaves the rest of the canyon available for development with up to 400 homes. The restricted area can be used for a park, tennis courts, etc., and the /sup 90/Sr activity will decay to levels permitting unrestricted usage in about 160 y.« less
Firestone, Rebecca; Moorsmith, Reid; James, Simon; Urey, Marilyn; Greifinger, Rena; Lloyd, Danielle; Hartenberger-Toby, Lisa; Gausman, Jewel; Sanoe, Musa
2016-09-28
Young Liberians, particularly undereducated young adults, face substantial sexual and reproductive health (SRH) challenges, with low uptake of contraceptive methods, high rates of unintended pregnancy, and low levels of knowledge about HIV status. The purpose of this study was to assess the impact of a 6-day intensive group learning intervention combined with on-site SRH services (called HealthyActions) among out-of-school young adults, implemented through an existing alternative education program, on uptake of contraception and HIV testing and counseling (HTC). The intervention was implemented among young women and men ages 15-35 who were enrolled in alternative basic education learning sites in 5 counties of Liberia. We conducted a randomized evaluation to assess program impact. Baseline data were collected in January-March 2014, and endline data in June-July 2014. Key outcomes of condom use, contraceptive use, and HTC were estimated with difference-in-difference models using fixed effects. All analyses were conducted in Stata 13. We assessed outcomes for 1,157 learners at baseline and 1,052 learners at endline, across 29 treatment and 26 control sites. After adjusting for potential confounders, learners in the HealthyActions intervention group were 12% less likely to report never using a condom with a regular partner over the last month compared with the control group (P = .02). Female learners who received HealthyActions were 13% more likely to use any form of modern contraception compared with learners in control sites (P<.001), with the greatest increase in the use of contraceptive implants. Learners in HealthyActions sites were 45% more likely to have received HTC (P<.001). Providing intensive group learning in a supportive environment coupled with on-site health services improved SRH outcomes among participating learners. The focus of HealthyActions on participatory learning for low-literacy populations presents an adaptable solution for health programming across Liberia and the region. © Firestone et al.
10 CFR 490.806 - Action on an application for waiver.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Action on an application for waiver. 490.806 Section 490.806 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Compliance § 490.806 Action on an application for waiver. (a) DOE grants or denies a complete...
10 CFR 490.806 - Action on an application for waiver.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Action on an application for waiver. 490.806 Section 490.806 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Compliance § 490.806 Action on an application for waiver. (a) DOE grants or denies a complete...
10 CFR 490.806 - Action on an application for waiver.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Action on an application for waiver. 490.806 Section 490.806 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Compliance § 490.806 Action on an application for waiver. (a) DOE grants or denies a complete...
10 CFR 490.806 - Action on an application for waiver.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Action on an application for waiver. 490.806 Section 490.806 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Compliance § 490.806 Action on an application for waiver. (a) DOE grants or denies a complete...
10 CFR 490.806 - Action on an application for waiver.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Action on an application for waiver. 490.806 Section 490.806 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Compliance § 490.806 Action on an application for waiver. (a) DOE grants or denies a complete...
75 FR 52733 - Record of Decision (ROD) for Fort Bliss Army Growth and Force Structure Realignment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... alternative consists of actions in three different categories (stationing/training, land use changes, and... (Stationing Action Alternative 4); land use changes that allow fixed site bivouac areas, mission support... supports Army expansion, future stationing actions, and land use changes and training infrastructure...
Environmental Assessment for ’Community Beach Center’ (RCS 04-899 & 05-350)
2005-12-19
with the olive ridley , the Kemp’s ridley (Lepidocheyls kempi) is the smallest of the sea turtle species. Kemp’s ridleys are considered to be the most...Alternative C is the preferred alternative. No Action Alternative: Under the No Action Altemative, a Community Beach Center would not be constructed at...funding permits, expand the facility along the lines of Alternative A. This is preferred alternative. Figure 6 illustrates the site plan for the
Alvarez, Isaac; de la Torre, Angel; Sainz, Manuel; Roldan, Cristina; Schoesser, Hansjoerg; Spitzer, Philipp
2007-09-15
Stimulus artifact is one of the main limitations when considering electrically evoked compound action potential for clinical applications. Alternating stimulation (average of recordings obtained with anodic-cathodic and cathodic-anodic bipolar stimulation pulses) is an effective method to reduce stimulus artifact when evoked potentials are recorded. In this paper we extend the concept of alternating stimulation by combining anodic-cathodic and cathodic-anodic recordings with a weight in general different to 0.5. We also provide an automatic method to obtain an estimation of the optimal weights. Comparison with conventional alternating, triphasic stimulation and masker-probe paradigm shows that the generalized alternating method improves the quality of electrically evoked compound action potential responses.
100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
HARRINGTON RA
2010-01-15
On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, tomore » all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.« less
Robustness in practice--the regional planning of health services.
Best, G; Parston, G; Rosenhead, J
1986-05-01
Earlier work has criticized the dominant tendencies in operational research contributions to health services planning as characterized by optimization, implausible demands for data, depoliticization, hierarchy and inflexibility. This paper describes an effort which avoids at least some of these pitfalls. The project was to construct a planning system for a regional health council in Ontario, Canada, which would take account of the possible alternative future states of the health-care system's environment and would aim to keep options for future development open. The planning system devised is described in the paper. It is based on robustness analysis, which evaluates alternative initial action sets in terms of the useful flexibility they preserve. Other features include the explicit incorporation of pressures for change generated outside the health-care system, and a satisficing approach to the identification of both initial action sets and alternative future configurations of the health-care system. It was found possible to borrow and radically 're-use' techniques or formulations from the mainstream of O.R. contributions. Thus the 'reference projection' method was used to identify inadequacies in performance which future health-care system configurations must repair. And Delphi analysis, normally a method for generating consensus, was used in conjunction with cluster analysis of responses to generate meaningfully different alternative futures.
An Enhanced Adaptive Management Approach for Remediation of Legacy Mercury in the South River
Foran, Christy M.; Baker, Kelsie M.; Grosso, Nancy R.; Linkov, Igor
2015-01-01
Uncertainties about future conditions and the effects of chosen actions, as well as increasing resource scarcity, have been driving forces in the utilization of adaptive management strategies. However, many applications of adaptive management have been criticized for a number of shortcomings, including a limited ability to learn from actions and a lack of consideration of stakeholder objectives. To address these criticisms, we supplement existing adaptive management approaches with a decision-analytical approach that first informs the initial selection of management alternatives and then allows for periodic re-evaluation or phased implementation of management alternatives based on monitoring information and incorporation of stakeholder values. We describe the application of this enhanced adaptive management (EAM) framework to compare remedial alternatives for mercury in the South River, based on an understanding of the loading and behavior of mercury in the South River near Waynesboro, VA. The outcomes show that the ranking of remedial alternatives is influenced by uncertainty in the mercury loading model, by the relative importance placed on different criteria, and by cost estimates. The process itself demonstrates that a decision model can link project performance criteria, decision-maker preferences, environmental models, and short- and long-term monitoring information with management choices to help shape a remediation approach that provides useful information for adaptive, incremental implementation. PMID:25665032
Ribeiro-Junior, Jerônimo Aparecido; Franchin, Marcelo; Cavallini, Miriam Elias; Denny, Carina; de Alencar, Severino Matias; Ikegaki, Masaharu; Rosalen, Pedro Luiz
2015-01-01
The aim of this study was to evaluate the gastroprotective activity of ethanolic extract of geopropolis (EEGP) from Melipona scutellaris and to investigate the possible mechanisms of action. The gastroprotective activity of the EEGP was evaluated using model ulcer induced by ethanol. To elucidate the possible mechanisms of action, we investigated the involvement of the nonprotein sulfhydryl (NP-SH) groups, nitric oxide and prostaglandins. In addition, the antisecretory activity of EEGP was also evaluated by pylorus ligated model. The EEGP orally administrated (300 mg/kg) reduced the ulcerative lesions induced by the ethanol (P < 0.05). Regarding the mechanism of action, the prior administration of nitric oxide and prostaglandins antagonists suppressed the activity of gastroprotective EEGP (P < 0.05). On the other hand the gastroprotective activity of EEGP was kept in the group pretreated with the antagonist of the NP-SH groups; furthermore the antisecretory activity was not significant (P > 0.05). These results support the alternative medicine use of geopropolis as gastroprotective and the activities observed show to be related to nitric oxide and prostaglandins production.
Ribeiro-Junior, Jerônimo Aparecido; Franchin, Marcelo; Cavallini, Miriam Elias; Denny, Carina; de Alencar, Severino Matias; Ikegaki, Masaharu; Rosalen, Pedro Luiz
2015-01-01
The aim of this study was to evaluate the gastroprotective activity of ethanolic extract of geopropolis (EEGP) from Melipona scutellaris and to investigate the possible mechanisms of action. The gastroprotective activity of the EEGP was evaluated using model ulcer induced by ethanol. To elucidate the possible mechanisms of action, we investigated the involvement of the nonprotein sulfhydryl (NP-SH) groups, nitric oxide and prostaglandins. In addition, the antisecretory activity of EEGP was also evaluated by pylorus ligated model. The EEGP orally administrated (300 mg/kg) reduced the ulcerative lesions induced by the ethanol (P < 0.05). Regarding the mechanism of action, the prior administration of nitric oxide and prostaglandins antagonists suppressed the activity of gastroprotective EEGP (P < 0.05). On the other hand the gastroprotective activity of EEGP was kept in the group pretreated with the antagonist of the NP-SH groups; furthermore the antisecretory activity was not significant (P > 0.05). These results support the alternative medicine use of geopropolis as gastroprotective and the activities observed show to be related to nitric oxide and prostaglandins production. PMID:25949263
43 CFR 46.130 - Mitigation measures in analyses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Mitigation measures in analyses. 46.130... Mitigation measures in analyses. (a) Bureau proposed action. The analysis of the proposed action and any alternatives must include an analysis of the effects of the proposed action or alternative as well as analysis...
NASA Technical Reports Server (NTRS)
Mayo, L. H.
1971-01-01
A preliminary provisional assessment of the prospects for the establishment of an adequate technology assessment function and the implications of the assessment function for the public decision process are presented. Effects of the technology assessment function on each phase of the public decision process and briefly explored. Significant implications during the next decade are projected with respect to the following phases: invention and development of alternative means (technological configurations); evaluation, selection and promotion of preferred courses of action; and modification of statutory scheme or social action program as an outcome of continuing monitoring and appraisal.
Looking and Touching: What Extant Approaches Reveal about the Structure of Early Word Knowledge
ERIC Educational Resources Information Center
Hendrickson, Kristi; Mitsven, Samantha; Poulin-Dubois, Diane; Zesiger, Pascal; Friend, Margaret
2015-01-01
The goal of the current study is to assess the temporal dynamics of vision and action to evaluate the underlying word representations that guide infants' responses. Sixteen-month-old infants participated in a two-alternative forced-choice word-picture matching task. We conducted a moment-by-moment analysis of looking and reaching behaviors as they…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1977-11-01
Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Gunnison, Colorado. The Phase II - Title I services include the preparation of topographic measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 0.5 million tons of tailings at the Gunnison site constitutes the most significant environmental impact, although windblownmore » tailings and external gamma radiation are also factors. The nine alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through IX). Cost estimates for the nine options range from $480,000 to $5,890,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present.« less
76 FR 41454 - Caribbean Fishery Management Council; Scoping Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... based on alternative selected in Action 3(a) and time series of landings data as defined in Action 1(a...., Puerto Rico, St. Thomas/St. John, St. Croix) based on the preferred management reference point time series selected by the Council in Actions 1(a) and 2(a). Alternative 2A. Use a mid-point or equidistant...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-02-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less
Final Environmental Impact Statement for the Ulysses Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1990-01-01
This Final (Tier 2) Environmental Impact Statement (FEIS) addresses the environmental impacts which may be caused by implementation of the Ulysses mission, a space flight mission to observe the polar regions of the Sun. The proposed action is completion of preparation and operation of the Ulysses spacecraft, including its planned launch at the earliest available launch opportunity on the Space Transportation System (STS) Shuttle in October 1990 or in the backup opportunity in November 1991. The alternative is canceling further work on the mission. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. This alternative was further evaluated and eliminated from consideration when, in November 1988, the U.S. Air Force, which procures the Titan 4, notified that it could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The Titan 4 launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) for the November 1991 launch opportunity. The only expected environment effects of the proposed action are associated with normal launch vehicle operation and are treated elsewhere. The environmental impacts of normal Shuttle launches were addressed in existing NEPA documentation and are briefly summarized. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects were judged insufficient to preclude Shuttle launches. There could also be environmental impacts associated with the accidental release of radiological material during launch, deployment, or interplanetary trajectory injection of the Ulysses spacecraft. Intensive analysis indicates that the probability of release is small. There are no environmental impacts in the no-action alternative; however, the U.S. Government and the European Space Agency would suffer adverse fiscal and programmatic impacts if this alternative were adopted. The scientific benefits of the mission would be delayed and possibly lost. There could be significant impacts on the ability of the U.S. to negotiate international agreements for cooperative space activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 165 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 165 consists of eight Corrective Action Sites (CASs): CAS 25-20-01, Lab Drain Dry Well; CAS 25-51-02, Dry Well; CAS 25-59-01, Septic System; CAS 26-59-01, Septic System; CAS 25-07-06, Train Decontamination Area; CAS 25-07-07, Vehicle Washdown; CAS 26-07-01, Vehicle Washdown Station; and CAS 25-47-01, Reservoir and French Drain. All eight CASsmore » are located in the Nevada Test Site, Nevada. Six of these CASs are located in Area 25 facilities and two CASs are located in Area 26 facilities. The eight CASs at CAU 165 consist of dry wells, septic systems, decontamination pads, and a reservoir. The six CASs in Area 25 are associated with the Nuclear Rocket Development Station that operated from 1958 to 1973. The two CASs in Area 26 are associated with facilities constructed for Project Pluto, a series of nuclear reactor tests conducted between 1961 to 1964 to develop a nuclear-powered ramjet engine. Based on site history, the scope of this plan will be a two-phased approach to investigate the possible presence of hazardous and/or radioactive constituents at concentrations that could potentially pose a threat to human health and the environment. The Phase I analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. If laboratory data obtained from the Phase I investigation indicates the presence of contaminants of concern, the process will continue with a Phase II investigation to define the extent of contamination. Based on the results of Phase I sampling, the analytical program for Phase II investigation may be reduced. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
2001-04-26
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 405, Area 3 Septic Systems, Tonopah Test Range (TTR), under the Federal Facility Agreement and Consent Order. Corrective Action Unit 405 consists of Corrective Action Sites 03-05-002-SW03, 03-05-002-SW04, and 03-05-002-SW07 (also collectively known as: Septic Waste Systems [SWSs] 3, 4, and 7). Located in Area 3 in the northwest section of the TTR, approximately 140 miles northwest of Las Vegas, this location was historically (betweenmore » 1960 and 1990) used as a research facility with the mission to perform defense-related projects, and whose operations generated sanitary and industrial wastewaters potentially contaminated with COPCs and disposed of in septic tanks and leachfields. Though Septic Waste Systems 3, 4, and 7 were origin ally constructed to receive sanitary sewage, they may have inadvertently received effluent containing potentially hazardous and radiological constituents containing acetone, benzene, ethylbenzene, 4-methyl-2-pentanone, toluene, xylenes, volatile organic compound constituents, phenols, arsenic, barium, lead, mercury, hydrocarbons of oil and grease, and uranium-234, -235, and -238. The Area 3 septic systems were documented in a DOE/NV 1996 report as being included in the septic tank abandonment program conducted by Sandia National Laboratories in 1993; however, this program was not completed and the possibility exists that some of the Area 3 septic tanks may not have been abandoned. Even though all of the SWSs addressed in this CAIP are inactive, geophysical surveys conducted in 1993 were generally inconclusive and did not provide useful data for the purposes of this investigation. The scope of this current investigation, therefore, will be to determine the existence of the identified CO PCs and excavation will be the primary investigation method employed for these leachfield systems, but this effort may be limited by existing facilities and utilities. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the subsequent corrective action decision document.« less
Yam, Chun-Shan
2007-11-01
The purpose of this article is to describe an alternative for creating scrollable movie loops for electronic presentations including PowerPoint. The alternative provided in this article enables academic radiologists to present scrollable movie loops in PowerPoint. The scrolling capability is created using Flash ActionScript. A Flash template with the required ActionScript code is provided. Users can simply download the template and follow the step-by-step demonstration to create scrollable movie loops. No previous ActionScript programming knowledge is necessary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, B.; Rhia, B.; Jackson, D.
2010-04-30
Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia)more » - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.« less
Miller, Carla K; Weinhold, Kellie R; Nagaraja, Haikady N
2016-03-01
To evaluate the impact of a worksite diabetes prevention intervention on secondary outcomes regarding the change in diet quality and components of the Health Action Process Approach (HAPA) theoretical framework. Pretest-posttest control group design with 3-month follow-up. University worksite. Employees aged 18-65 years with prediabetes (n = 68). A 16-week group-based intervention adapted from the Diabetes Prevention Program. Diet quality was assessed using the Alternative Healthy Eating Index 2010; HAPA components were assessed via written questionnaire. Repeated-measures ANOVA compared the between- and within-group change in outcomes across time. Significant difference occurred between groups for the change in consumption of nuts/legumes and red/processed meats postintervention and for fruits at 3-month follow-up (all P < .05); a significant increase in total Alternative Healthy Eating Index 2010 score occurred postintervention in the experimental group (P = .002). The changes in action planning, action self-efficacy, and coping self-efficacy from HAPA were significantly different between groups after the intervention; the change in outcome expectancies was significantly different between groups at 3-month follow-up (all P < .05). The worksite intervention facilitated improvement in diet quality and in planning and efficacious beliefs regarding diabetes prevention. Further research is needed to evaluate the long-term impact of the intervention. Copyright © 2016 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.
Review of ecological-based risk management approaches used at five Army Superfund sites.
Poucher, Sherri L; Tracey, Gregory A; Johnson, Mark S; Haines, Laurie B
2012-04-01
Factors used in environmental remedial decision making concerning ecological risk are not well understood or necessarily consistent. Recent Records of Decision (RODs) for Army CERCLA sites were reviewed to select case studies where remedial management occurred in response to ecological risks. Thirty-four Army RODs were evaluated representing decisions promulgated between 1996 and 2004. Five were selected based on assessments that remedial actions were clearly linked to concern for ecological receptors. The Ecological Risk Assessment (ERA) approach and the subsequent risk management process were reviewed for each site. The case studies demonstrated that the ERA findings, as well as critical management decisions regarding interpretation of identified ecological risks, were determinants of remedial action objectives. Decisions regarding the selection of remedial alternatives were based on a set of criteria prescribed by Superfund requirements and guidance. Remedial alternative evaluations require protection of human health and the environment, but protective conditions were determined using different methods at each site. Examining the remedial management process for the 5 case study sites revealed that uncertainty in the risk assessment and decisions regarding appropriate spatial scales for both risk assessment and remediation were important factors influencing remedial action decisions. The case reviews also revealed that levels of documentation were variable from site to site. In the future, more detailed documentation of decision criteria and the development of criteria that consider the resilience of the site will result in more technically defensible ecological risk management. Copyright © 2011 SETAC.
Neckles, Hilary A.; Lyons, James E.; Guntenspergen, Glenn R.; Shriver, W. Gregory; Adamowicz, Susan C.
2015-01-01
Most salt marshes in the USA have been degraded by human activities, and coastal managers are faced with complex choices among possible actions to restore or enhance ecosystem integrity. We applied structured decision making (SDM) to guide selection of monitoring variables and management priorities for salt marshes within the National Wildlife Refuge System in the northeastern USA. In general, SDM is a systematic process for decomposing a decision into its essential elements. We first engaged stakeholders in clarifying regional salt marsh decision problems, defining objectives and attributes to evaluate whether objectives are achieved, and developing a pool of alternative management actions for achieving objectives. Through this process, we identified salt marsh attributes that were applicable to monitoring National Wildlife Refuges on a regional scale and that targeted management needs. We then analyzed management decisions within three salt marsh units at Prime Hook National Wildlife Refuge, coastal Delaware, as a case example of prioritizing management alternatives. Values for salt marsh attributes were estimated from 2 years of baseline monitoring data and expert opinion. We used linear value modeling to aggregate multiple attributes into a single performance score for each alternative, constrained optimization to identify alternatives that maximized total management benefits subject to refuge-wide cost constraints, and used graphical analysis to identify the optimal set of alternatives for the refuge. SDM offers an efficient, transparent approach for integrating monitoring into management practice and improving the quality of management decisions.
Ethical issues in action-oriented research in Indonesia.
Rachmawaty, Rini
2017-09-01
Action-oriented research is one of the most frequent research types implemented to transform community health in Indonesia. Three researchers and 11 graduate students from a developed country in East Asia conducted a fieldwork program in a remote area in South Sulawesi Province. Although the project was completed, whether or not the international standards for human subject research were applied into that study remains unclear. This study aimed to examine ethical issues raised from that case, analyze constraints to the problems, and recommend alternatives to protect vulnerable populations from being exploited by local/international researchers. A problem-solving approach was used in this study. It began with problem identification, evaluation of the action-oriented research goal, investigation of the constraints to the problem, and recommendation of some relevant alternatives to address the central issue. Ethical Consideration: The approval for conducting the action-oriented research that being investigated in this work was only obtained from the Head of local district. Some ethical issues were found in this case. No special protection for this population, no informed consent was obtained from the participants, exposure to social and economic risks, no future benefits for the subjects, and conflict of interests. Lack of control from the local research ethics committee and lack of competence of local researchers on human subject research were considered as the constraints to the problems. Creating an independent research ethics committee, providing research ethics training to the local researchers, obtaining written/video consents from underserved populations, and meeting local health needs were recommended alternatives to solve these problems. Indonesian government bodies should reform their international collaborative system on research involving human subjects. Exploitation may not occur if all participants as well as all local and national governing bodies understand the research ethics on human subjects and apply it into their practice.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-01
The DOE proposes to authorize Washington State University (WSU) to proceed with the detailed design, construction, and equipping of the proposed Center for Advanced Industrial Processes (CAIP). The proposed project would involve construction of a three story building containing laboratories, classrooms, seminar rooms, and graduate student and administrative office space. Existing buildings would be demolished. The proposed facility would house research in thermal/fluid sciences, bioengineering, manufacturing processes, and materials processing. Under the {open_quotes}no-action{close_quotes} DOE would not authorize WSU to proceed with construction under the grant. WSU would then need to consider alternatives for proceeding without DOE funds. Such alternatives (includingmore » delaying or scaling back the project), would result in a postponement or slight reduction in the minor adverse environmental, safety and health Impacts of the project evaluated in this assessment. More importantly, these alternatives would affect the important environmental, safety, health, and programmatic benefits of the projects. The surrounding area is fully urbanized and the campus is intensely developed around the proposed site. The buildings scheduled for demolition do not meet State energy codes, are not air conditioned, and lack handicapped access. Sensitive resources (historical/archeological, protected species/critical habitats, wetlands/floodplains, national forests/parks/trails, prime farmland and special sources of water) would not be affected as they do not occur on or near the proposed site. Cumulative impacts would be small. The proposed action is not related to other actions being considered under other NEPA reviews. There is no conflict between the proposed action and any applicable Federal, State, regional or local land use plans and policies.« less
Torii, Yasushi; Goto, Yoshitaka; Nakahira, Shinji; Ginnaga, Akihiro
2014-11-01
The biological activity of botulinum toxin type A has been evaluated using the mouse intraperitoneal (ip) LD50 test. This method requires a large number of mice to precisely determine toxin activity, and, as such, poses problems with regard to animal welfare. We previously developed a compound muscle action potential (CMAP) assay using rats as an alternative method to the mouse ip LD50 test. In this study, to evaluate this quantitative method of measuring toxin activity using CMAP, we assessed the parameters necessary for quantitative tests according to ICH Q2 (R1). This assay could be used to evaluate the activity of the toxin, even when inactive toxin was mixed with the sample. To reduce the number of animals needed, this assay was set to measure two samples per animal. Linearity was detected over a range of 0.1-12.8 U/mL, and the measurement range was set at 0.4-6.4 U/mL. The results for accuracy and precision showed low variability. The body weight was selected as a variable factor, but it showed no effect on the CMAP amplitude. In this study, potency tests using the rat CMAP assay of botulinum toxin type A demonstrated that it met the criteria for a quantitative analysis method. Copyright © 2014 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andrews, Robert; Marutzky, Sam
2000-09-01
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeVore, J.R.; Hinton, R.R.
1994-08-01
The shielded transfer tanks (STTs) are five obsolete cylindrical shipping casks which were used to transport high specific activity radioactive solutions by rail during the 1960s and early 1970s. The STTs are currently stored at the Oak Ridge National Laboratory under a shed roof. This report is an evaluation to determine the preferred alternative for the final disposition of the five STTs. The decommissioning alternatives assessed include: (1) the no action alternative to leave the STTs in their present location with continued surveillance and maintenance; (2) solidification of contents within the tanks and holding the STTs in long term retrievablemore » storage; (3) sale of one or more of the used STTs to private industry for use at their treatment facility with the remaining STTs processed as in Alternative 4; and (4) removal of tank contents for de-watering/retrievable storage, limited decontamination to meet acceptance criteria, smelting the STTs to recycle the metal through the DOE contaminated scrap metal program, and returning the shielding lead to the ORNL lead recovery program because the smelting contractor cannot reprocess the lead. To completely evaluate the alternatives for the disposition of the STTs, the contents of the tanks must be characterized. Shielding and handling requirements, risk considerations, and waste acceptance criteria all require that the radioactive inventory and free liquids residual in the STTs be known. Because characterization of the STT contents in the field was not input into a computer model to predict the probable inventory and amount of free liquid. The four alternatives considered were subjected to a numerical scoring procedure. Alternative 4, smelting the STTs to recycle the metal after removal/de-watering of the tank contents, had the highest score and is, therefore, recommended as the preferred alternative. However, if a buyer for one or more STT could be found, it is recommended that Alternative 3 be reconsidered.« less
Alternatives to Certain Phthalates Partnership
The alternatives assessment partnership project on alternatives to certain phthalates seeks to eplore the human health and environmental profiles of eight action plan phthalates and functional alternatives
2012-08-09
identified as wetlands or 50- or 100-year flood plains, neither wetlands nor flood plains will be adversely impacted by either the proposed action or the...In addition, the proposed action and no action alternative are not located within or would impact wetland areas. Therefore, a Finding ofNo...Practicable Alternative (FONPA) to avoid wetland impacts is not required for the proposed action. C C. PETERS, Col, USAFR DATE Commander, 911 1h Airlift
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gustafson, F.W.; Todd, M.E.
1993-09-01
The release of large volumes of water to waste disposal cribs at the Hanford Site`s 100-N Area caused contaminants, principally strontium-90, to be carried toward the Columbia River through the groundwater. Since shutdown of the N Reactor, these releases have been discontinued, although small water flows continue to be discharged to the 1325-N crib. Most of the contamination which is now transported to the river is occurring as a result of the natural groundwater movement. The contaminated groundwater at N Springs flows into the river through seeps and springs along the river`s edge. An expedited response action (ERA) has beenmore » proposed to eliminate or restrict the flux of strontium-90 into the river. A cost benefit analysis of potential remedial alternatives was completed that recommends the alternative which best meets given selection criteria prescribed by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The methodology used for evaluation, cost analysis, and alternative recommendation is the engineering evaluation/cost analysis (EE/CA). Complete remediation of the contaminated groundwater beneath 100-N Area was not a principal objective of the analysis. The objective of the cost benefit analysis was to identify a remedial alternative that optimizes the degree of benefit produced for the costs incurred.« less
78 FR 23832 - Labeling Requirements for Alternative Fuels and Alternative Fueled Vehicles
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
... Fuels and Alternative Fueled Vehicles AGENCY: Federal Trade Commission (FTC or Commission). ACTION... Alternative Fuels and Alternative Fueled Vehicles'') to consolidate the FTC's alternative fueled vehicle (AFV...) established federal programs to encourage the development of alternative fuels and alternative fueled vehicles...
Sublingual Delivery of Frovatriptan: An Indication of Potential Alternative Route
Verma, Surajpal; Prasad, Shyam Baboo
2014-01-01
Frovatriptan, a 5-HT1B and 5-HT1D receptor agonist, is used for the treatment of acute migraine attack. This molecule is classified into second line therapy because of its slow onset of action (peak response obtained after 4 hours of administration) and low bioavailability (25%). Moreover, its therapy is the most costly among all triptans. Attempt has been made in present work to suggest a way out to fasten its onset of action and to enhance its bioavailability. Prepared tablets were evaluated by physicochemical tests, in vitro permeation studies, ex vivo permeation studies, and histopathological studies. Suitable mathematical calculations were performed to calculate the minimum amount of bioavailability that could be enhanced. Tablets containing chitosan (5% w/w) were found to give optimum results. Prepared tablets can double the bioavailability of frovatriptan and can initiate its response within 10 minutes of its administration. Suggestive alternative has the potential to increase the efficacy of frovatriptan for treating acute migraine attack. PMID:27433492
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2005-01-01
Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) A void duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and Air Force Space Command (AFSPC) installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Joint Test Protocol (JTP) contains the critical requirements and tests necessary to qualify alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel Applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of NASA and Air Force Space Command (AFSPC) participants. The Field Test Plan (FTP), entitled Joint Test Protocol for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, prepared by ITB, defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP.
Alternative self-dual gravity in eight dimensions
NASA Astrophysics Data System (ADS)
Nieto, J. A.
2016-07-01
We develop an alternative Ashtekar formalism in eight dimensions. In fact, using a MacDowell-Mansouri physical framework and a self-dual curvature symmetry, we propose an action in eight dimensions in which the Levi-Civita tenor with eight indices plays a key role. We explicitly show that such an action contains number of linear, quadratic and cubic terms in the Riemann tensor, Ricci tensor and scalar curvature. In particular, the linear term is reduced to the Einstein-Hilbert action with cosmological constant in eight dimensions. We prove that such a reduced action is equivalent to the Lovelock action in eight dimensions.
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
Stage III Detailed Project Report and Environmental Impact Statement, Conesus Lake, New York.
1981-09-01
would have on the fish population. Based on Corps studies, it was concluded that there may be some impact and that the plan may lead to improved ...are based on Lhe 30-60 plan of improvement to the outlet control works. A1.7.6 Lake Target Rule Curves - Flood Control Evaluation To evaluate the...effect of rversinq many of the effects noted in the no-action alternative r(sult inq in high tax revenues ( based on high values), improvement i i (It
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... years. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GEIS in...
40 CFR 1502.16 - Environmental consequences.
Code of Federal Regulations, 2014 CFR
2014-07-01
... § 1502.16 Environmental consequences. This section forms the scientific and analytic basis for the... environmental impacts of the alternatives including the proposed action, any adverse environmental effects which... concerned. (See § 1506.2(d).) (d) The environmental effects of alternatives including the proposed action...
40 CFR 1502.16 - Environmental consequences.
Code of Federal Regulations, 2012 CFR
2012-07-01
... § 1502.16 Environmental consequences. This section forms the scientific and analytic basis for the... environmental impacts of the alternatives including the proposed action, any adverse environmental effects which... concerned. (See § 1506.2(d).) (d) The environmental effects of alternatives including the proposed action...
40 CFR 1502.16 - Environmental consequences.
Code of Federal Regulations, 2013 CFR
2013-07-01
... § 1502.16 Environmental consequences. This section forms the scientific and analytic basis for the... environmental impacts of the alternatives including the proposed action, any adverse environmental effects which... concerned. (See § 1506.2(d).) (d) The environmental effects of alternatives including the proposed action...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL,more » Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium, beryllium, total petroleum hydrocarbons; and total Resource Conservation and Recovery Act metals. Field activities will consist of geophysical and radiological surveys, and collecting soil samples at biased locations by appropriate methods. A two-step data quality objective strategy will be followed: (1) define the nature of contamination at each CAS location by identifying any contamination above preliminary action levels (PALs); and, (2) determine the extent of contamination identified above PALs. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Firestone, Rebecca; Moorsmith, Reid; James, Simon; Urey, Marilyn; Greifinger, Rena; Lloyd, Danielle; Hartenberger-Toby, Lisa; Gausman, Jewel; Sanoe, Musa
2016-01-01
ABSTRACT Introduction: Young Liberians, particularly undereducated young adults, face substantial sexual and reproductive health (SRH) challenges, with low uptake of contraceptive methods, high rates of unintended pregnancy, and low levels of knowledge about HIV status. The purpose of this study was to assess the impact of a 6-day intensive group learning intervention combined with on-site SRH services (called HealthyActions) among out-of-school young adults, implemented through an existing alternative education program, on uptake of contraception and HIV testing and counseling (HTC). Methods: The intervention was implemented among young women and men ages 15–35 who were enrolled in alternative basic education learning sites in 5 counties of Liberia. We conducted a randomized evaluation to assess program impact. Baseline data were collected in January–March 2014, and endline data in June–July 2014. Key outcomes of condom use, contraceptive use, and HTC were estimated with difference-in-difference models using fixed effects. All analyses were conducted in Stata 13. Results: We assessed outcomes for 1,157 learners at baseline and 1,052 learners at endline, across 29 treatment and 26 control sites. After adjusting for potential confounders, learners in the HealthyActions intervention group were 12% less likely to report never using a condom with a regular partner over the last month compared with the control group (P = .02). Female learners who received HealthyActions were 13% more likely to use any form of modern contraception compared with learners in control sites (P<.001), with the greatest increase in the use of contraceptive implants. Learners in HealthyActions sites were 45% more likely to have received HTC (P<.001). Conclusion: Providing intensive group learning in a supportive environment coupled with on-site health services improved SRH outcomes among participating learners. The focus of HealthyActions on participatory learning for low-literacy populations presents an adaptable solution for health programming across Liberia and the region. PMID:27688717
Health economic evaluation: important principles and methodology.
Rudmik, Luke; Drummond, Michael
2013-06-01
To discuss health economic evaluation and improve the understanding of common methodology. This article discusses the methodology for the following types of economic evaluations: cost-minimization, cost-effectiveness, cost-utility, cost-benefit, and economic modeling. Topics include health-state utility measures, the quality-adjusted life year (QALY), uncertainty analysis, discounting, decision tree analysis, and Markov modeling. Economic evaluation is the comparative analysis of alternative courses of action in terms of both their costs and consequences. With increasing health care expenditure and limited resources, it is important for physicians to consider the economic impact of their interventions. Understanding common methodology involved in health economic evaluation will improve critical appraisal of the literature and optimize future economic evaluations. Copyright © 2012 The American Laryngological, Rhinological and Otological Society, Inc.
1996-04-01
This study is to screen and evaluate remediation alternatives for IRP sites at Alpena CR TC, Alpena , MI. The purpose of this FS is to develop, screen... Alpena CRTC. The first step in the PS process is to identify the RAOs and general response actions (GRAs). RAOs consist of medium-specific or site
2008-12-01
extinction of a threatened or endangered species or the demolition of a historical building). For the proposed project alternatives, most resource...Resources The Endangered Species Act (16 USC 1531-1544) requires federal agencies to avoid jeopardizing the continued existence of endangered or...threatened species and avoid destroying or adversely modifying their critical habitat. Federal agencies must evaluate the effects of their actions on
Program of policy studies in science and technology
NASA Technical Reports Server (NTRS)
Mayo, L. H.
1973-01-01
The application of an interdisciplinary, problem-oriented capability to the performance of total social impact evaluations is discussed. The consequences of introducing new configurations, technological or otherwise into future social environments are presented. The primary characteristics of the program are summarized: (1) emphasis on interdisciplinary, problem-oriented analysis; (2) development of intra- and inter-institutional arrangements for the purpose of analyzing social problems, evaluating existing programs, and assessing the social impacts of prospective policies, programs, and other public actions; (3) focus on methodological approaches to the projection of alternative future social environments, the identification of the effects of the introduction of new policies, programs, or other actions into the social system, and the evaluation of the social impacts of such effects; (4) availability of analytical resources for advisory and research tasks, and provision for use of program facilities as a neutral forum for the discussion of public issues involving involving the impact of advancing technology on social value-institutional processes.
Harrison, David; Coughlin, Conor; Hogan, Dylan; Edwards, Deborah A; Smith, Benjamin C
2018-01-01
The present paper describes a methodology for evaluating impacts of Superfund remedial alternatives on the regional economy in the context of a broader sustainability evaluation. Although economic impact methodology is well established, some applications to Superfund remedial evaluation have created confusion because of seemingly contradictory results. This confusion arises from failure to be explicit about 2 opposing impacts of remediation expenditures: 1) positive regional impacts of spending additional money in the region and 2) negative regional impacts of the need to pay for the expenditures (and thus forgo other expenditures in the region). The present paper provides a template for economic impact assessment that takes both positive and negative impacts into account, thus providing comprehensive estimates of net impacts. The paper also provides a strategy for identifying and estimating major uncertainties in the net impacts. The recommended methodology was applied at the Portland Harbor Superfund Site, located along the Lower Willamette River in Portland, Oregon, USA. The US Environmental Protection Agency (USEPA) developed remedial alternatives that it estimated would cost up to several billion dollars, with construction durations possibly lasting decades. The economic study estimated regional economic impacts-measured in terms of gross regional product (GRP), personal income, population, and employment-for 5 of the USEPA alternatives relative to the "no further action" alternative. Integr Environ Assess Manag 2018;14:32-42. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Cul, G.D.; Osborne, P.E.; Beck, D.E.
1991-01-01
The Paducah Gaseous Diffusion Plant (PGDP) C-400 Decontamination Facility generates aqueous solutions that originate in drum washing, machine parts and equipment cleaning, and other decontamination processes. The chemical composition of the waste depends on the particular operation involved. In general, the waste contains uranyl, fluoride, carbonate, and nitrate ions, plus soaps, detergents, secondary contaminants, and particulate matter. The uranium content is rather variable ranging between 0.5 and 30 g/l. The main contaminants are fluoride, technetium, uranium, and other heavy metals. The plan included (1) a literature search to support best available technology (BAT) evaluation of treatment alternatives, (2) a qualitymore » assurance/quality control plan, (3) suggestion of alternative treatment options, (4) bench-scale tests studies of the proposed treatment alternatives, and (5) establishment of the final recommendation. The following report records the evaluation of items (1) to (3) of the action plan for the BAT evaluation of alternatives for the treatment and retreatment of uranium-contaminated wastewater at the PGDP C-400 treatment facility. After a thorough literature search, five major technologies were considered: (1) precipitation/coprecipitation, (2) reverse osmosis, (3) ultrafiltration, (4) supported liquid membranes, and (5) ion exchange. Biosorption was also considered, but as it is a fairly new technology with few demonstrations of its capabilities, it is mentioned only briefly in the report. Based on C-400's requirements and facilities, the precipitation/coprecipitation process appears to be the best suited for use at the plant. Four different treatment options using the precipitation/coprecipitation technology are proposed. Bench-scale studies of the four options are suggested. 37 refs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-07-01
Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less
Tayabas, Luz María Tejada; León, Teresita Castillo; ESPINO, JOEL MONARREZ
2014-01-01
This short essay aims at commenting on the origin, development, rationale, and main characteristics of qualitative evaluation (QE), emphasizing the value of this methodological tool to evaluate health programs and services. During the past decades, different approaches have come to light proposing complementary alternatives to appraise the performance of public health programs, mainly focusing on the implementation process involved rather than on measuring the impact of such actions. QE is an alternative tool that can be used to illustrate and understand the process faced when executing health programs. It can also lead to useful suggestions to modify its implementation from the stakeholders’ perspectives, as it uses a qualitative approach that considers participants as reflective subjects, generators of meanings. This implies that beneficiaries become involved in an active manner in the evaluated phenomena with the aim of improving the health programs or services that they receive. With this work we want to encourage evaluators in the field of public health to consider the use of QE as a complementary tool for program evaluation to be able to identify areas of opportunity to improve programs’ implementation processes from the perspective of intended beneficiaries. PMID:25152220
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... Kewaunee County, Wisconsin, on the west-central shore of Lake Michigan. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The draft... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2010-0041] Dominion Energy Kewaunee, Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... experience for the visitors to this symbolic and historic cultural landscape. During the preparation of the... landscape reports and inventories. No-Action Alternative Under the No-Action Alternative, current management... landscape, with the large amount of deferred maintenance and aging infrastructure, pedestrian and bicycle...
Code of Federal Regulations, 2013 CFR
2013-10-01
... actions, including long-term and indirect impacts, to the injured resources or other resources. (6) The... injured resources to their baseline condition, as measured in terms of the physical, chemical, or... recovery with minimal management actions. Possible alternatives within this range could reflect varying...
Code of Federal Regulations, 2010 CFR
2010-10-01
... actions, including long-term and indirect impacts, to the injured resources or other resources. (6) The... injured resources to their baseline condition, as measured in terms of the physical, chemical, or... recovery with minimal management actions. Possible alternatives within this range could reflect varying...
Code of Federal Regulations, 2011 CFR
2011-10-01
... actions, including long-term and indirect impacts, to the injured resources or other resources. (6) The... injured resources to their baseline condition, as measured in terms of the physical, chemical, or... recovery with minimal management actions. Possible alternatives within this range could reflect varying...
Code of Federal Regulations, 2014 CFR
2014-10-01
... actions, including long-term and indirect impacts, to the injured resources or other resources. (6) The... injured resources to their baseline condition, as measured in terms of the physical, chemical, or... recovery with minimal management actions. Possible alternatives within this range could reflect varying...
10 CFR 51.101 - Limitations on actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Limitations on actions. 51.101 Section 51.101 Energy...) have an adverse environmental impact, or (ii) limit the choice of reasonable alternatives. (2) Any..., or (ii) limit the choice of reasonable alternatives may be grounds for denial of the license. In the...
10 CFR 51.101 - Limitations on actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Limitations on actions. 51.101 Section 51.101 Energy...) have an adverse environmental impact, or (ii) limit the choice of reasonable alternatives. (2) Any..., or (ii) limit the choice of reasonable alternatives may be grounds for denial of the license. In the...
10 CFR 51.101 - Limitations on actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Limitations on actions. 51.101 Section 51.101 Energy...) have an adverse environmental impact, or (ii) limit the choice of reasonable alternatives. (2) Any..., or (ii) limit the choice of reasonable alternatives may be grounds for denial of the license. In the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bachrach, A.; Hoopes, J.; Morycz, D.
1984-12-01
This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less
NASA Astrophysics Data System (ADS)
Oviedo, Antonio F. P.; Bursztyn, Marcel
2016-05-01
This paper applies a participatory approach in evaluating small-scale fisheries, focusing on the Arapaima gigas fishery in the Brazilian Amazon. The evaluation uses the social-ecological system (SES) framework, adopted to explain the conditions needed for sustainability and user cooperation in natural resources management, as a more suitable alternative to the `blueprint' or `panaceas' approaches, based only on property rights or governmental intervention. However, managers and users often do not have the necessary information compiled and available for a specific SES while some actions need to be taken immediately. Thus, consensus and negotiation among stakeholders about SES variables may be useful to evaluate system performance and indicate actions to promote sustainability. In the case study, using a consensus-building model, we found that arapaima SES leads to sustainability and is far from being a case of `tragedy of the commons.' More investments in suitable monitoring and enforcement for adaptive management are recommended. Adopting an SES framework based on stakeholders' prospects may be useful until complete interdisciplinary studies become available so as to seek of sustainability in the long term.
Posterior cingulate cortex mediates outcome-contingent allocation of behavior
Hayden, Benjamin Y.; Nair, Amrita C.; McCoy, Allison N.; Platt, Michael L.
2008-01-01
SUMMARY Adaptive decision making requires selecting an action and then monitoring its consequences to improve future decisions. The neuronal mechanisms supporting action evaluation and subsequent behavioral modification, however, remain poorly understood. To investigate the contribution of posterior cingulate cortex (CGp) to these processes, we recorded activity of single neurons in monkeys performing a gambling task in which the reward outcome of each choice strongly influenced subsequent choices. We found that CGp neurons signaled reward outcomes in a nonlinear fashion, and that outcome-contingent modulations in firing rate persisted into subsequent trials. Moreover, firing rate on any one trial predicted switching to the alternative option on the next trial. Finally, microstimulation in CGp following risky choices promoted a preference reversal for the safe option on the following trial. Collectively, these results demonstrate that CGp directly contributes to the evaluative processes that support dynamic changes in decision making in volatile environments. PMID:18940585
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
The role of flight planning in aircrew decision performance
NASA Technical Reports Server (NTRS)
Pepitone, Dave; King, Teresa; Murphy, Miles
1989-01-01
The role of flight planning in increasing the safety and decision-making performance of the air transport crews was investigated in a study that involved 48 rated airline crewmembers on a B720 simulator with a model-board-based visual scene and motion cues with three degrees of freedom. The safety performance of the crews was evaluated using videotaped replays of the flight. Based on these evaluations, the crews could be divided into high- and low-safety groups. It was found that, while collecting information before flights, the high-safety crews were more concerned with information about alternative airports, especially the fuel required to get there, and were characterized by making rapid and appropriate decisions during the emergency part of the flight scenario, allowing these crews to make an early diversion to other airports. These results suggest that contingency planning that takes into account alternative courses of action enhances rapid and accurate decision-making under time pressure.
Structured decision making as a framework for large-scale wildlife harvest management decisions
Robinson, Kelly F.; Fuller, Angela K.; Hurst, Jeremy E.; Swift, Bryan L.; Kirsch, Arthur; Farquhar, James F.; Decker, Daniel J.; Siemer, William F.
2016-01-01
Fish and wildlife harvest management at large spatial scales often involves making complex decisions with multiple objectives and difficult tradeoffs, population demographics that vary spatially, competing stakeholder values, and uncertainties that might affect management decisions. Structured decision making (SDM) provides a formal decision analytic framework for evaluating difficult decisions by breaking decisions into component parts and separating the values of stakeholders from the scientific evaluation of management actions and uncertainty. The result is a rigorous, transparent, and values-driven process. This decision-aiding process provides the decision maker with a more complete understanding of the problem and the effects of potential management actions on stakeholder values, as well as how key uncertainties can affect the decision. We use a case study to illustrate how SDM can be used as a decision-aiding tool for management decision making at large scales. We evaluated alternative white-tailed deer (Odocoileus virginianus) buck-harvest regulations in New York designed to reduce harvest of yearling bucks, taking into consideration the values of the state wildlife agency responsible for managing deer, as well as deer hunters. We incorporated tradeoffs about social, ecological, and economic management concerns throughout the state. Based on the outcomes of predictive models, expert elicitation, and hunter surveys, the SDM process identified management alternatives that optimized competing objectives. The SDM process provided biologists and managers insight about aspects of the buck-harvest decision that helped them adopt a management strategy most compatible with diverse hunter values and management concerns.
Courses of action for effects based operations using evolutionary algorithms
NASA Astrophysics Data System (ADS)
Haider, Sajjad; Levis, Alexander H.
2006-05-01
This paper presents an Evolutionary Algorithms (EAs) based approach to identify effective courses of action (COAs) in Effects Based Operations. The approach uses Timed Influence Nets (TINs) as the underlying mathematical model to capture a dynamic uncertain situation. TINs provide a concise graph-theoretic probabilistic approach to specify the cause and effect relationships that exist among the variables of interest (actions, desired effects, and other uncertain events) in a problem domain. The purpose of building these TIN models is to identify and analyze several alternative courses of action. The current practice is to use trial and error based techniques which are not only labor intensive but also produce sub-optimal results and are not capable of modeling constraints among actionable events. The EA based approach presented in this paper is aimed to overcome these limitations. The approach generates multiple COAs that are close enough in terms of achieving the desired effect. The purpose of generating multiple COAs is to give several alternatives to a decision maker. Moreover, the alternate COAs could be generalized based on the relationships that exist among the actions and their execution timings. The approach also allows a system analyst to capture certain types of constraints among actionable events.
1990-09-01
INCORPORATED 00 Applied Environmental , Inc.DTIC -• 0CH2M HILL DataChem, Inc. EbTE R.L. Stollar and Associates S MAY10 1994U Prepared for: j U.S. ARMY...ACTION 4. RECOMMEND SITES FOR THE NO ACTION REMEDIAL ALTERNATIVE 5. PROVIDE A BASIS FOR DETAILED CHARACTERIZATION OF THE RISK ASSOCIATED WITH ALL SITES...POE .Anuivyto defected bySL eAtOeksa pe mehOd 67 SCALE IN FEET ’PM$042 ., A. 6, I:C",. - DF1 44n uxt.• j•i p Ci 16 -F-- Pb -L a2 iPrepared for: 1
Occupational medicine: toward a worker/patient empowerment approach to occupational illness.
Lax, Michael B
2002-01-01
Clinicians practicing occupational medicine are increasingly confronted with patients who have complex illnesses with chronic nonspecific symptoms. Most clinicians use the traditional tools of biomedicine to diagnose and treat the illness, determine etiology, and assess disability. This article argues that the biomedical approach is inadequate to effectively evaluate and treat occupational illness. After reviewing several critiques of biomedicine, including biopsychosocial, feminist, class, and critical theory/postmodern perspectives, the author offers an alternative approach that builds on aspects of these perspectives as well as the "popular education" work of Paulo Freire. Constraints on, and possibilities for, the development of an alternative approach that attempts to build patients' capacities for transformative action are explored.
A Shovel-Ready Solution to Fill the Nursing Data Gap in the Interdisciplinary Clinical Picture.
Keenan, Gail M; Lopez, Karen Dunn; Sousa, Vanessa E C; Stifter, Janet; Macieira, Tamara G R; Boyd, Andrew D; Yao, Yingwei; Herdman, T Heather; Moorhead, Sue; McDaniel, Anna; Wilkie, Diana J
2018-01-01
To critically evaluate 2014 American Academy of Nursing (AAN) call-to-action plan for generating interoperable nursing data. Healthcare literature. AAN's plan will not generate the nursing data needed to participate in big data science initiatives in the short term because Logical Observation Identifiers Names and Codes and Systematized Nomenclature of Medicine - Clinical Terms are not yet ripe for generating interoperable data. Well-tested viable alternatives exist. Authors present recommendations for revisions to AAN's plan and an evidence-based alternative to generating interoperable nursing data in the near term. These revisions can ultimately lead to the proposed terminology goals of the AAN's plan in the long term. © 2017 NANDA International, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 414 is located on the Tonopah Test Range, which is approximately 130 miles northwest of Las Vegas, Nevada, and approximately 40 miles southeast of Tonopah, Nevada. The CAU 414 site consists of the release of radionuclides to the surface and shallow subsurface from the conduct of the Clean Slate III (CSIII) storage–transportation test conducted on June 9, 1963. CAU 414 includes one corrective action site (CAS), TA-23-03CS (Pu Contaminated Soil). The known releases at CAU 414 are the result of the atmospheric dispersal of contamination from the 1963 CSIII test. The CSIII test was a nonnuclearmore » detonation of a nuclear device located inside a reinforced concrete bunker covered with 8 feet of soil. This test dispersed radionuclides, primarily uranium and plutonium, on the ground surface. The presence and nature of contamination at CAU 414 will be evaluated based on information collected from a corrective action investigation (CAI). The investigation is based on the data quality objectives (DQOs) developed on June 7, 2016, by representatives of the Nevada Division of Environmental Protection; the U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective action alternatives for CAU 414.« less
Tangen, Brian A.; Gleason, Robert A.; Stamm, John F.
2013-01-01
Many wetland impoundments managed by the U.S. Fish and Wildlife Service (USFWS) National Wildlife Refuge System throughout the northern Great Plains rely on rivers as a primary water source. A large number of these impoundments currently are being stressed from changes in water supplies and quality, and these problems are forecast to worsen because of projected changes to climate and land use. For example, many managed wetlands in arid regions have become degraded owing to the long-term accumulation of salts and increased salinity associated with evapotranspiration. A primary goal of the USFWS is to provide aquatic habitats for a diversity of waterbirds; thus, wetland managers would benefit from a tool that facilitates evaluation of wetland habitat quality in response to current and anticipated impacts of altered hydrology and salt balances caused by factors such as climate change, water availability, and management actions. A spreadsheet model that simulates the overall water and salinity balance (WSB model) of managed wetland impoundments is presented. The WSB model depicts various habitat metrics, such as water depth, salinity, and surface areas (inundated, dry), which can be used to evaluate alternative management actions under various water-availability and climate scenarios. The WSB model uses widely available spreadsheet software, is relatively simple to use, relies on widely available inputs, and is readily adaptable to specific locations. The WSB model was validated using data from three National Wildlife Refuges with direct and indirect connections to water resources associated with rivers, and common data limitations are highlighted. The WSB model also was used to conduct simulations based on hypothetical climate and management scenarios to demonstrate the utility of the model for evaluating alternative management strategies and climate futures. The WSB model worked well across a range of National Wildlife Refuges and could be a valuable tool for USFWS staff when evaluating system state and management alternatives and establishing long-term goals and objectives.
Seizure Action Plans Do Not Reduce Health Care Utilization in Pediatric Epilepsy Patients.
Roundy, Lindsi M; Filloux, Francis M; Kerr, Lynne; Rimer, Alyssa; Bonkowsky, Joshua L
2016-03-01
Management of pediatric epilepsy requires complex coordination of care. We hypothesized that an improved seizure management care plan would reduce health care utilization and improve outcomes. The authors conducted a cohort study with historical controls of 120 epilepsy patients before and after implementation of a "Seizure Action Plan." The authors evaluated for differences in health care utilization including emergency department visits, hospitalizations, clinic visits, telephone calls, and the percentage of emergency department visits that resulted in hospitalization in patients who did or did not have a Seizure Action Plan. The authors found that there was no decrease in these measures of health care utilization, and in fact the number of follow-up clinic visits was increased in the group with Seizure Action Plans (4.2 vs 3.3, P = .006). However, the study was underpowered to detect smaller differences. This study suggests that pediatric epilepsy quality improvement measures may require alternative approaches to reduce health care utilization and improve outcomes. © The Author(s) 2015.
Seizure Action Plans Do Not Reduce Health Care Utilization in Pediatric Epilepsy Patients
Roundy, Lindsi M.; Filloux, Francis M.; Kerr, Lynne; Rimer, Alyssa; Bonkowsky, Joshua L.
2015-01-01
Management of pediatric epilepsy requires complex coordination of care. We hypothesized that an improved seizure management care plan would reduce healthcare utilization and improve outcomes. We conducted a cohort study with historical controls of 120 epilepsy patients before and after implementation of a “Seizure Action Plan.” We evaluated for differences in healthcare utilization including emergency department visits, hospitalizations, clinic visits, telephone calls, and the percentage of emergency department visits that resulted in hospitalization in patients who did or did not have a Seizure Action Plan. We found that there was no decrease in these measures of healthcare utilization, and in fact the number of follow-up clinic visits was increased in the group with Seizure Action Plans (4.2 versus 3.3, p 0.006). However, the study was underpowered to detect smaller differences. Our study suggests that pediatric epilepsy quality improvement measures may require alternative approaches to reduce healthcare utilization and improve outcomes. PMID:26245799
Dorazio, R.M.; Johnson, F.A.
2003-01-01
Bayesian inference and decision theory may be used in the solution of relatively complex problems of natural resource management, owing to recent advances in statistical theory and computing. In particular, Markov chain Monte Carlo algorithms provide a computational framework for fitting models of adequate complexity and for evaluating the expected consequences of alternative management actions. We illustrate these features using an example based on management of waterfowl habitat.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
..., Washington. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. Any interested party may submit comments on the draft supplement to the GEIS for... NUCLEAR REGULATORY COMMISSION [Docket Number 50-397; NRC-2010-0029] Energy Northwest, Columbia...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
..., approximately 27 miles east-southeast of Green Bay, WI. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. As discussed in Section 9.4 of the... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2010-0041] Dominion Energy Kewaunee, Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... action alternatives vary by the number and location of study areas, the type of experimental design... nonlethal), and the type of experimental design (demography vs. occupancy). All action alternatives are...-FF01E00000] Experimental Removal of Barred Owls To Benefit Threatened Northern Spotted Owls; Record of...
Shim, Jae-Mahn
2017-01-01
Drawing on the theory of social action in organizational and institutional sociology, this paper examines the behavioral consequences of plural logics of action. It addresses the question based on the empirical case of plural medical systems that are composed of both biomedicine and alternative medicine. Applying mixed methods of a cross-national panel data analysis and a content analysis of medical journal articles, it finds that plural systems affect health outcomes negatively when tensions between biomedicine and alternative medicine are unaddressed. In contrast, plural systems produce tangible health benefits when biomedicine and alternative medicine are coordinated through government policies or by health care organizations/professionals. This paper proposes plurality coordination as an important mechanism that modifies the behavioral consequences of plural logics. This proposition contributes to providing theoretical answers to the sociological puzzle that plural logics of action produce inconsistent behavioral consequences. PMID:29253867
2008-11-01
the proposed site has the potential for adverse effects on surface water bodies in the event of a spill or uncontrolled erosion. Implementation of...inclusion of a No Action Alternative against which potential effects can be compared. While the No Action Alternative would not satisfy the purpose... potential effects on project site and adjacent land uses. The foremost factor affecting a proposed action in terms of land use is its compliance
The sustainability solutions agenda.
Sarewitz, Daniel; Clapp, Richard; Crumbley, Cathy; Kriebel, David; Tickner, Joel
2012-01-01
Progress toward a more sustainable society is usually described in a "knowledge-first" framework, where science characterizes a problem in terms of its causes and mechanisms as a basis for subsequent action. Here we present a different approach-A Sustainability Solutions Agenda (SSA)-which seeks from the outset to identify the possible pathways to solutions. SSA focuses on uncovering paths to sustainability by improving current technological practice, and applying existing knowledge to identify and evaluate technological alternatives. SSA allows people and organizations to transition toward greater sustainability without sacrificing essential technological functions, and therefore does not threaten the interests that depend on those functions. Whereas knowledge-first approaches view scientific information as sufficient to convince people to take the right actions, even if those actions are perceived as against their immediate interests, SSA allows values to evolve toward greater attention to sustainability as a result of the positive experience of solving a problem.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Offices's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 127 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 127 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of 12 Corrective Action Sites (CASs) located at Test Cell C; the Engine Maintenance, Assembly, and Disassembly (E-MAD) Facility; the X-Tunnel in Area 25; the Pluto Disassembly Facility; themore » Pluto Check Station; and the Port Gaston Training Facility in Area 26. These CASs include: CAS 25-01-05, Aboveground Storage Tank (AST); CAS 25-02-02, Underground Storage Tank (UST); CAS 25-23-11, Contaminated Materials; CAS 25-12-01, Boiler; CAS 25-01-06, AST; CAS 25-01-07, AST; CAS 25-02-13, UST; CAS 26- 01-01, Filter Tank (Rad) and Piping; CAS 26-01-02, Filter Tank (Rad); CAS 26-99-01, Radioactively Contaminated Filters; CAS 26-02-01, UST; CAS 26-23-01, Contaminated Liquids Spreader. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for CAU 127 include radionuclides, metals, total petroleum hydrocarbons, volatile organic compounds, asbestos, and polychlorinated biphenyls. Additionally, beryllium may be present at some locations. The sources of potential releases are varied, but releases of contaminated liquids may have occurred and may have migrated into and impacted soil below and surrounding storage vessels at some of the CASs. Also, at several CASs, asbestos-containing materials may be present on the aboveground structures and may be friable. Exposure pathways are limited to ingestion, inhalation, and dermal contact (adsorption) of soils/sediments or liquids, or inhalation of contaminants by site workers due to disturbance of contaminated materials. Future land-use scenarios limit subsequent uses of the CASs to various nonresidential (i.e., industrial) activities. Field activities will consist of radiological walkover and screening surveys, and field-screening and collecting of both tank content and soil samples, and further sample testing as appropriate. A two-step data quality objective strategy will be followed: (1) Phase I will be to collect environmental samples for laboratory analysis to confirm the presence or absence of contaminants at concentrations exceeding preliminary action levels; and (2) Phase II will be to collect additional environmental samples for laboratory analysis to determine the extent of contamination identified in Phase I. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Barton, C; Nazombei, E
2000-03-01
This article describes the aims, methods, materials and topics used in a participatory workshop created by Alternative Women in Development. The organization aims to bridge the gaps in analyzing human rights and economic justice in both North and South from a feminist perspective through a workshop. This workshop considers the varied roles that women play in the global economy and features a series of anecdotes to illustrate the diverse ways in which globalization affects women in all regions worldwide. The workshop runs for a minimum of 3 hours and is structured as follows: introduction; plenary: identifying the human rights of the women; small-group work, plenary: building a group analysis and discussion of alternatives to the existing policies; and individual and plenary evaluations. Furthermore, four anecdotes used at the workshop are presented. Among the outcomes of the workshop included the identification of the problem causes and development of strategies for action.
NASA Astrophysics Data System (ADS)
Deeb, R. A.; Hawley, E.
2011-12-01
This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and alternative remedial strategies for groundwater remediation under a variety of Federal and state cleanup programs, including technical impracticability (TI) and other Applicable or Relevant and Appropriate Requirement (ARAR) waivers, state and local designations such as groundwater management zones, Alternate Concentration Limits (ACLs), use of monitored natural attenuation (MNA) over long timeframes, and more. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies to illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, timeframe, and potential remedial effectiveness. Case studies provide examples of the flexible, site-specific, application of alternative endpoints and alternative remedial strategies that have been used in the past to manage and remediate groundwater contamination at complex sites. For example, at least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. These designations typically indicate that groundwater contamination is present above permissible levels. Soil and groundwater within these zones are managed to protect human health and the environment. Lesson learned for the analyses conducted and the case studies evaluated allow for a more careful consideration of alternative, beneficial, and cost-effective cleanup objectives and metrics that can be achieved over the short-term (while eventually meeting long-term cleanup objectives or demonstrating the applicability of alternative endpoints), thus improving the site cleanup process at complex sites where appropriate.
NASA Astrophysics Data System (ADS)
Simione, Luca; Nolfi, Stefano
2014-10-01
In this paper we illustrate how the capacity to select the most appropriate actions when handling contexts affording multiple conflicting actions can be solved either through a selective attention strategy (in which the stimuli affording alternative actions are filtered out at the perceptual level through top-down regulation) or at later processing stages through an action selection strategy (through the suppression of the premotor information eliciting alternative actions). By carrying out a series of experiments in which a neuro-robot develops an ability to choose between conflicting actions, we were able to identify the conditions that lead to the development of solutions based on one strategy or another. Overall, the results indicate that the selective attention strategy constitutes the most simple and straightforward mechanism enabling the acquisition of such capacities. Moreover, the characteristics of the adaptive/learning process influence whether the adaptive robot converges towards a selective attention and/or action selection strategy.
76 FR 9777 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... technical questions about individual alternative test method decisions, refer to the contact person...
Resource Limitation Issues In Real-Time Intelligent Systems
NASA Astrophysics Data System (ADS)
Green, Peter E.
1986-03-01
This paper examines resource limitation problems that can occur in embedded AI systems which have to run in real-time. It does this by examining two case studies. The first is a system which acoustically tracks low-flying aircraft and has the problem of interpreting a high volume of often ambiguous input data to produce a model of the system's external world. The second is a robotics problem in which the controller for a robot arm has to dynamically plan the order in which to pick up pieces from a conveyer belt and sort them into bins. In this case the system starts with a continuously changing model of its environment and has to select which action to perform next. This latter case emphasizes the issues in designing a system which must operate in an uncertain and rapidly changing environment. The first system uses a distributed HEARSAY methodology running on multiple processors. It is shown, in this case, how the com-binatorial growth of possible interpretation of the input data can require large and unpredictable amounts of computer resources for data interpretation. Techniques are presented which achieve real-time operation by limiting the combinatorial growth of alternate hypotheses and processing those hypotheses that are most likely to lead to meaningful interpretation of the input data. The second system uses a decision tree approach to generate and evaluate possible plans of action. It is shown how the combina-torial growth of possible alternate plans can, as in the previous case, require large and unpredictable amounts of computer time to evalu-ate and select from amongst the alternative. The use of approximate decisions to limit the amount of computer time needed is discussed. The use of concept of using incremental evidence is then introduced and it is shown how this can be used as the basis of systems that can combine heuristic and approximate evidence in making real-time decisions.
76 FR 21673 - Alternative Efficiency Determination Methods and Alternate Rating Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
... EERE-2011-BP-TP-00024] RIN 1904-AC46 Alternative Efficiency Determination Methods and Alternate Rating Methods AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of... and data related to the use of computer simulations, mathematical methods, and other alternative...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
... proposed action and alternatives for development of a large-scale, mixed-use, mixed-density master- planned... applicant group's preferred alternative; (c) Reduced Footprint/Increased Density Alternative; (d) Reduced Footprint/Same Density Alternative; (e) Focused Avoidance Alternative; and (f) Southwest Site, an off site...
76 FR 50168 - Coconino and Kaibab National Forests, Arizona, Four-Forest Restoration Initiative
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... disturbances such as insect and disease, fire and climate change (FSM 2020.5). This project is expected to put... changing climatic conditions (drought), fire, insect, and disease. Purpose and Need for Action In contrast... alternative, will be considered. The no-action alternative represents no change and serves as the baseline for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-28
... Management Command (IMCOM) has reviewed the Final Environmental Impact Statement (FEIS) for implementing Army... Preferred Alternative for the Proposed Action. The Preferred Alternative has several components that consist... stationing of a Combat Aviation Brigade (CAB) of up to 2,800 Soldiers. If all stationing components are...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-05
... Hampshire. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. Any interested party may submit comments on the draft supplement to the GEIS for... NUCLEAR REGULATORY COMMISSION [NRC-2010-0206; Docket No. 50-443] NextEra Energy Seabrook, LLC...
ERIC Educational Resources Information Center
van den Putte, Bas; Hoogstraten, Johan
1997-01-01
Problems found in the application of structural equation modeling to the theory of reasoned action are explored, and an alternative model specification is proposed that improves the fit of the data while leaving intact the structural part of the model being tested. Problems and the proposed alternative are illustrated. (SLD)
ERIC Educational Resources Information Center
Kelley, Edgar A.
The Nebraska Opportunities for Volunteers in ACTION (NOVA) was an experiment at the University of Nebraska aimed at welding traditional academic instruction and year-long community service experience into an educational alternative for undergraduates. It was initiated on July 1, 1971 as the first University Year for ACTION (UYA) program in the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... action alternatives and the No Action Alternative. Natural, cultural, and socioeconomic resource impacts.... Cohn, Chief, or Issac J. Gaston, Site Selection Specialist, Capacity Planning and Site Selection Branch..., Capacity Planning and Site Selection Branch. [FR Doc. 2011-1817 Filed 1-31-11; 8:45 am] BILLING CODE P ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... Aurora, Colorado (southeast Denver metropolitan area). The remediation actions will be identified through... options may include federal actions which will be the subject of the EIS. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that could reduce the risk of life loss...
Final environmental impact statement for the Galileo Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1989-01-01
This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The only expected environmental effects of the proposed action are associated with normal launch vehicle operation, and are treated in published National Environmental Policy Act (NEPA) documents on the Shuttle (NASA 1978) and the Kennedy Space Center (NASA 1979), and in the KSC Environmental Resources Document (NASA 1986) and the Galileo Tier 1 EIS (NASA 1988a). The environmental impacts of a normal launch were deemed insufficient to preclude Shuttle operations. Environmental impacts may also result from launch or mission accidents that could release plutonium fuel used in the Galileo power system. Intensive analysis of the possible accidents associated with the proposed action reveal small health or environmental risks. There are no environmental impacts in the no-action alternative. The remote possibility of environmental impacts of the proposed action must be weighed against the large adverse fiscal and programmatic impacts inherent in the no-action alternative.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
...The Nuclear Regulatory Commission (NRC) is amending its regulations to provide alternate fracture toughness requirements for protection against pressurized thermal shock (PTS) events for pressurized water reactor (PWR) pressure vessels. This final rule provides alternate PTS requirements based on updated analysis methods. This action is desirable because the existing requirements are based on unnecessarily conservative probabilistic fracture mechanics analyses. This action reduces regulatory burden for those PWR licensees who expect to exceed the existing requirements before the expiration of their licenses, while maintaining adequate safety, and may choose to comply with the final rule as an alternative to complying with the existing requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-06-01
This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards formore » th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.« less
Sol Fustiñana, María; de la Fuente, Verónica; Federman, Noel; Freudenthal, Ramiro
2014-01-01
The ubiquitin–proteasome system (UPS) of protein degradation has been evaluated in different forms of neural plasticity and memory. The role of UPS in such processes is controversial. Several results support the idea that the activation of this system in memory consolidation is necessary to overcome negative constrains for plasticity. In this case, the inhibition of the UPS during consolidation impairs memory. Similar results were reported for memory reconsolidation. However, in other cases, the inhibition of UPS had no effect on memory consolidation and reconsolidation but impedes the amnesic action of protein synthesis inhibition after retrieval. The last finding suggests a specific action of the UPS inhibitor on memory labilization. However, another interpretation is possible in terms of the synthesis/degradation balance of positive and negative elements in neural plasticity, as was found in the case of long-term potentiation. To evaluate these alternative interpretations, other reconsolidation-interfering drugs than translation inhibitors should be tested. Here we analyzed initially the UPS inhibitor effect in contextual conditioning in crabs. We found that UPS inhibition during consolidation impaired long-term memory. In contrast, UPS inhibition did not affect memory reconsolidation after contextual retrieval but, in fact, impeded memory labilization, blocking the action of drugs that does not affect directly the protein synthesis. To extend these finding to vertebrates, we performed similar experiments in contextual fear memory in mice. We found that the UPS inhibitor in hippocampus affected memory consolidation and blocked memory labilization after retrieval. These findings exclude alternative interpretations to the requirement of UPS in memory labilization and give evidence of this mechanism in both vertebrates and invertebrates. PMID:25135196
Evaluation of Enhanced Risk Monitors for Use on Advanced Reactors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramuhalli, Pradeep; Veeramany, Arun; Bonebrake, Christopher A.
This study provides an overview of the methodology for integrating time-dependent failure probabilities into nuclear power reactor risk monitors. This prototypic enhanced risk monitor (ERM) methodology was evaluated using a hypothetical probabilistic risk assessment (PRA) model, generated using a simplified design of a liquid-metal-cooled advanced reactor (AR). Component failure data from industry compilation of failures of components similar to those in the simplified AR model were used to initialize the PRA model. Core damage frequency (CDF) over time were computed and analyzed. In addition, a study on alternative risk metrics for ARs was conducted. Risk metrics that quantify the normalizedmore » cost of repairs, replacements, or other operations and management (O&M) actions were defined and used, along with an economic model, to compute the likely economic risk of future actions such as deferred maintenance based on the anticipated change in CDF due to current component condition and future anticipated degradation. Such integration of conventional-risk metrics with alternate-risk metrics provides a convenient mechanism for assessing the impact of O&M decisions on safety and economics of the plant. It is expected that, when integrated with supervisory control algorithms, such integrated-risk monitors will provide a mechanism for real-time control decision-making that ensure safety margins are maintained while operating the plant in an economically viable manner.« less
A behavioral and neural evaluation of prospective decision-making under risk.
Symmonds, Mkael; Bossaerts, Peter; Dolan, Raymond J
2010-10-27
Making the best choice when faced with a chain of decisions requires a person to judge both anticipated outcomes and future actions. Although economic decision-making models account for both risk and reward in single-choice contexts, there is a dearth of similar knowledge about sequential choice. Classical utility-based models assume that decision-makers select and follow an optimal predetermined strategy, regardless of the particular order in which options are presented. An alternative model involves continuously reevaluating decision utilities, without prescribing a specific future set of choices. Here, using behavioral and functional magnetic resonance imaging (fMRI) data, we studied human subjects in a sequential choice task and use these data to compare alternative decision models of valuation and strategy selection. We provide evidence that subjects adopt a model of reevaluating decision utilities, in which available strategies are continuously updated and combined in assessing action values. We validate this model by using simultaneously acquired fMRI data to show that sequential choice evokes a pattern of neural response consistent with a tracking of anticipated distribution of future reward, as expected in such a model. Thus, brain activity evoked at each decision point reflects the expected mean, variance, and skewness of possible payoffs, consistent with the idea that sequential choice evokes a prospective evaluation of both available strategies and possible outcomes.
Raiho, Ann M.; Hooten, Mevin B.; Bates, Scott; Hobbs, N. Thompson
2015-01-01
Overabundant populations of ungulates have caused environmental degradation and loss of biological diversity in ecosystems throughout the world. Culling or regulated harvest is often used to control overabundant species. These methods are difficult to implement in national parks, other types of conservation reserves, or in residential areas where public hunting may be forbidden by policy. As a result, fertility control has been recommended as a non-lethal alternative for regulating ungulate populations. We evaluate this alternative using white-tailed deer in national parks in the vicinity of Washington, D.C., USA as a model system. Managers seek to reduce densities of white-tailed deer from the current average (50 deer per km2) to decrease harm to native plant communities caused by deer. We present a Bayesian hierarchical model using 13 years of population estimates from 8 national parks in the National Capital Region Network. We offer a novel way to evaluate management actions relative to goals using short term forecasts. Our approach confirms past analyses that fertility control is incapable of rapidly reducing deer abundance. Fertility control can be combined with culling to maintain a population below carrying capacity with a high probability of success. This gives managers confronted with problematic overabundance a framework for implementing management actions with a realistic assessment of uncertainty.
Raiho, Ann M; Hooten, Mevin B; Bates, Scott; Hobbs, N Thompson
2015-01-01
Overabundant populations of ungulates have caused environmental degradation and loss of biological diversity in ecosystems throughout the world. Culling or regulated harvest is often used to control overabundant species. These methods are difficult to implement in national parks, other types of conservation reserves, or in residential areas where public hunting may be forbidden by policy. As a result, fertility control has been recommended as a non-lethal alternative for regulating ungulate populations. We evaluate this alternative using white-tailed deer in national parks in the vicinity of Washington, D.C., USA as a model system. Managers seek to reduce densities of white-tailed deer from the current average (50 deer per km2) to decrease harm to native plant communities caused by deer. We present a Bayesian hierarchical model using 13 years of population estimates from 8 national parks in the National Capital Region Network. We offer a novel way to evaluate management actions relative to goals using short term forecasts. Our approach confirms past analyses that fertility control is incapable of rapidly reducing deer abundance. Fertility control can be combined with culling to maintain a population below carrying capacity with a high probability of success. This gives managers confronted with problematic overabundance a framework for implementing management actions with a realistic assessment of uncertainty.
Comparative Developmental Toxicity of Flavonoids Using an Integrative Zebrafish System
Bugel, Sean M.; Bonventre, Josephine A.; Tanguay, Robert L.
2016-01-01
Flavonoids are a large, structurally diverse class of bioactive naturally occurring chemicals commonly detected in breast milk, soy based infant formulas, amniotic fluid, and fetal cord blood. The potential for pervasive early life stage exposures raises concerns for perturbation of embryogenesis, though developmental toxicity and bioactivity information is limited for many flavonoids. Therefore, we evaluated a suite of 24 flavonoid and flavonoid-like chemicals using a zebrafish embryo-larval toxicity bioassay—an alternative model for investigating developmental toxicity of environmentally relevant chemicals. Embryos were exposed to 1–50 µM of each chemical from 6 to 120 h postfertilization (hpf), and assessed for 26 adverse developmental endpoints at 24, 72, and 120 hpf. Behavioral changes were evaluated in morphologically normal animals at 24 and 72 hpf, at 120 hpf using a larval photomotor response (LPR) assay. Gene expression was comparatively evaluated for all compounds for effects on biomarker transcripts indicative of AHR (cyp1a) and ER (cyp19a1b, esr1, lhb, vtg) pathway bioactivity. Overall, 15 of 24 flavonoids elicited adverse effects on one or more of the developmental or behavioral endpoints. Hierarchical clustering and principle component analyses compared toxicity profiles and identified 3 distinct groups of bioactive flavonoids. Despite robust induction of multiple estrogen-responsive biomarkers, co-exposure with ER and GPER antagonists did not ameliorate toxicity, suggesting ER-independence and alternative modes of action. Taken together, these studies demonstrate that development is sensitive to perturbation by bioactive flavonoids in zebrafish that are not related to traditional estrogen receptor mode of action pathways. This integrative zebrafish platform provides a useful framework for evaluating flavonoid developmental toxicity and hazard prioritization. PMID:27492224
Current issues and perspectives in food safety and risk assessment.
Eisenbrand, G
2015-12-01
In this review, current issues and opportunities in food safety assessment are discussed. Food safety is considered an essential element inherent in global food security. Hazard characterization is pivotal within the continuum of risk assessment, but it may be conceived only within a very limited frame as a true alternative to risk assessment. Elucidation of the mode of action underlying a given hazard is vital to create a plausible basis for human toxicology evaluation. Risk assessment, to convey meaningful risk communication, must be based on appropriate and reliable consideration of both exposure and mode of action. New perspectives, provided by monitoring human exogenous and endogenous exposure biomarkers, are considered of great promise to support classical risk extrapolation from animal toxicology. © The Author(s) 2015.
Simulating long-term effectiveness and efficiency of management scenarios for an invasive grass
Jarnevich, Catherine S.; Holcombe, Tracy R.; Cullinane Thomas, Catherine; Frid, Leonardo; Olsson, Aaryn D.
2015-01-01
Resource managers are often faced with trade-offs in allocating limited resources to manage plant invasions. These decisions must often be made with uncertainty about the location of infestations, their rate of spread and effectiveness of management actions. Landscape level simulation tools such as state-and-transition simulation models (STSMs) can be used to evaluate the potential long term consequences of alternative management strategies and help identify those strategies that make efficient use of resources. We analyzed alternative management scenarios for African buffelgrass (Pennisetum ciliare syn. Cenchrus ciliaris) at Ironwood Forest National Monument, Arizona using a spatially explicit STSM implemented in the Tool for Exploratory Landscape Scenario Analyses (TELSA). Buffelgrass is an invasive grass that is spreading rapidly in the Sonoran Desert, affecting multiple habitats and jurisdictions. This invasion is creating a novel fire risk and transforming natural ecosystems. The model used in this application incorporates buffelgrass dispersal and establishment and management actions and effectiveness including inventory, treatment and post-treatment maintenance. We simulated 11 alternative scenarios developed in consultation with buffelgrass managers and other stakeholders. The scenarios vary according to the total budget allocated for management and the allocation of that budget between different kinds of management actions. Scenario results suggest that to achieve an actual reduction and stabilization of buffelgrass populations, management unconstrained by fiscal restrictions and across all jurisdictions and private lands is required; without broad and aggressive management, buffelgrass populations are expected to increase over time. However, results also suggest that large upfront investments can achieve control results that require relatively minimal spending in the future. Investing the necessary funds upfront to control the invasion results in the most efficient use of resources to achieve lowest invaded acreage in the long-term.
Garcia, Sabrina O; Feltrin, Ana Carla P; Garda-Buffon, Jaqueline
2018-06-11
The peroxidase (POD) enzyme, obtained from different sources, has been described in the literature regarding its good results of reduction in concentration or degradation levels of mycotoxins, such as aflatoxin B1, deoxynivalenol and zearalenone. This study aimed at evaluating the action of commercial peroxidase and peroxidase from soybean bran (SB) and rice bran (RB) in zearalenone (ZEA) reduction in a model solution and the characterization of the mechanism of enzyme action. POD was extracted from SB and RB in phosphate buffer by orbital agitation. Evaluation of the action of commercial POD and POD from SB and RB in ZEA reduction was carried out in phosphate buffer and aqueous solution, respectively. Parameters of K M and V max were determined in the concentration range from 0.16 to 6 µg mL -1 . ZEA reduction was determined and the mechanism of enzyme action was characterized by Fourier transform infrared spectroscopy and high-pressure liquid chromatography-electrospray tandem mass spectrometry. Commercial POD and POD from RB and SB reduced ZEA concentration by 69.9, 47.4 and 30.6% in 24 h, respectively. K M values were 39.61 and 8.90 µM whereas V max values were 0.170 and 0.011 µM min -1 for commercial POD and POD from RB, respectively. The characterization of the mechanism of enzyme action showed the oxidoreductive action of commercial POD in the mycotoxin. The use of commercial POD and POD from agro-industrial by-products, such as SB and RB, could be a promising alternative for ZEA biodegradation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDonell, M.M.; Peterson, J.M.
1991-11-01
The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this timemore » has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action.« less
32 CFR 989.8 - Analysis of alternatives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Analysis of alternatives. 989.8 Section 989.8... ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.8 Analysis of alternatives. (a) The Air Force must analyze reasonable alternatives to the proposed action and the “no action” alternative in all EAs and EISs, as fully...
77 FR 8865 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... INFORMATION CONTACT: An electronic copy of each alternative test method approval document is available on the...
75 FR 7593 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... electronic copy of each alternative test method approval document is available on EPA's Web site at http...
78 FR 11174 - Recent Postings of Broadly Applicable Alternative Test Methods
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... Applicable Alternative Test Methods AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the broadly applicable alternative test method approval decisions... INFORMATION CONTACT: An electronic copy of each alternative test method approval document is available on the...
77 FR 14583 - Notice to Manufacturers of Alternative Fuel Vans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... Alternative Fuel Vans AGENCY: Federal Aviation Administration (FAA), U.S. DOT. ACTION: Notice to Manufacturers of Alternative Fuel Vans. SUMMARY: Projects funded under the Airport Improvement Program (AIP) must... (FAA) is considering issuing waivers to foreign manufacturers of alternative fuel vans. This notice...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
..., GSA, as the operational Joint Lead Agency, announces its Notice of Intent (NOI) to prepare an EIS for... York. The US Department of Homeland Security (DHS) will act as a Joint Lead Agency in ongoing...-Action Alternative''). The Action Alternative will be further refined into a series of reasonably...
ERIC Educational Resources Information Center
Wood, J. Luke; Hilton, Adriel A.
2012-01-01
This article encourages community college leaders to employ ethical paradigms when constructing and considering alternative courses of action in decision-making processes. The authors discuss four previously articulated paradigms (e.g., ethic of justice, ethic of critique, ethic of care, and ethic of the profession) and propose an additional…
Perry, Russell W.; Brandes, Patricia L.; Burau, Jon R.; Sandstrom, Philip T.; Skalski, John R.
2015-01-01
Juvenile Chinook Salmon Oncorhynchus tshawytscha emigrating from natal tributaries of the Sacramento River, California, must negotiate the Sacramento-San Joaquin River Delta (hereafter, the Delta), a complex network of natural and man-made channels linking the Sacramento River with San Francisco Bay. Fish that enter the interior and southern Delta—the region to the south of the Sacramento River where water pumping stations are located—survive at a lower rate than fish that use alternative migration routes. Consequently, total survival decreases as the fraction of the population entering the interior Delta increases, thus spurring management actions to reduce the proportion of fish that are entrained into the interior Delta. To better inform management actions, we modeled entrainment probability as a function of hydrodynamic variables. We fitted alternative entrainment models to telemetry data that identified when tagged fish in the Sacramento River entered two river channels leading to the interior Delta (Georgiana Slough and the gated Delta Cross Channel). We found that the probability of entrainment into the interior Delta through both channels depended strongly on the river flow and tidal stage at the time of fish arrival at the river junction. Fish that arrived during ebb tides had a low entrainment probability, whereas fish that arrived during flood tides (i.e., when the river's flow was reversed) had a high probability of entering the interior Delta. We coupled our entrainment model with a flow simulation model to evaluate the effect of nighttime closures of the Delta Cross Channel gates on the daily probability of fish entrainment into the interior Delta. Relative to 24-h gate closures, nighttime closures increased daily entrainment probability by 3 percentage points on average if fish arrived at the river junction uniformly throughout the day and by only 1.3 percentage points if 85% of fish arrived at night. We illustrate how our model can be used to evaluate the effects of alternative water management actions on fish entrainment into the interior Delta.
Ginges, Jeremy; Atran, Scott
2009-06-01
In standard models of decision making, participation in violent political action is understood as the product of instrumentally rational reasoning. According to this line of thinking, instrumentally rational individuals will participate in violent political action only if there are selective incentives that are limited to participants. We argue in favor of an alternate model of political violence where participants are motivated by moral commitments to collective sacred values. Correlative and experimental empirical evidence in the context of the Israeli-Palestinian conflict strongly supports this alternate view.
Cautionary note concerning the CuSO4 X-ray laser. [alternative to lasing action
NASA Technical Reports Server (NTRS)
Billman, K. W.; Mark, H.
1973-01-01
For the so far unconfirmed lasing action claimed by Kepros et al. (1972) to have been obtained by focusing a 1.06-micron radiation of a q-switched Nd(3+) glass laser to a small cylindrical volume inside a CuSO4-doped gelatin medium supported between two glass plates, an alternate explanation is proposed that does not depend on the assumption of laser action in copper. The proposed explanation shows how collimated X-ray beams might be created under the experimental conditions described by Kepros et al.
Alternative Test Method for Olefins in Gasoline
This action proposes to allow for an additional alternative test method for olefins in gasoline, ASTM D6550-05. The allowance of this additional alternative test method will provide more flexibility to the regulated industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
IT Corporation, Las Vegas, NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfillsmore » used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will concentrate on geophysical surveys to confirm the presence or absence of disposed waste within a CAS and verify the boundaries of disposal areas; penetrate disposal feature covers via excavation and/or drilling; perform geodetic surveys; and be used to collect both soil and environmental samples for laboratory analyses. Phase II will deal only with those CASs where a contaminant of concern has been identified. This phase will involve the collection of additional soil and/or environmental samples for laboratory analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-06-01
Ford, Bacon and Davis Utah Inc. has reevaluated the Durango site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. This engineering assessment has included the preparation of topographic measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the nearly 1.6 million tons of tailings at the Durango site constitutes the most significant environmental impact, although windblownmore » tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the seven options range from about $10,700,000 for stabilization in-place, to about $21,800,000 for disposal at a distance of about 10 mi. Three principal alternatives for the reprocessing of the Durango tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing.« less
Kumar, Vikas; Del Vasto-Terrientes, Luis; Valls, Aida; Schuhmacher, Marta
2016-01-01
The regional water allocation planning is one of those complex decision problems where holistic approach to water supply management considering different criteria would be valuable. However, multi-criteria decision making with diverse indicators measured on different scales and uncertainty levels is difficult to solve. Objective of this paper is to develop scenarios for the future imbalances in water supply and demand for a water stressed Mediterranean area of Northern Spain (Tarragona) and to test the applicability and suitability of an outranking method ELECTRE-III-H for evaluating sectoral water allocation policies. This study is focused on the use of alternative water supply scenarios to fulfil the demand of water from three major sectors: domestic, industrial and agricultural. A detail scenario planning for regional water demand and supply has been discussed. For each future scenario of climate change, the goal is to obtain a ranking of a set of possible actions with regards to different types of indicators (costs, water stress and environmental impact). The analytical method used is based on outranking models for decision aid with hierarchical structures of criteria and ranking alternatives using partial preorders based on pairwise preference relations. We compare several adaptation measures including alternative water sources (reclaimed water and desalination); inter basin water transfer and sectoral demand management coming from industry, agriculture and domestic sectors and tested the sustainability of management actions for different climate change scenarios. Results have shown use of alternative water resources as the most reliable alternative with medium reclaimed water reuse in industry and agriculture and low to medium use of desalination water in domestic and industrial sectors as the best alternative. The proposed method has several advantages such as the management of heterogeneous scales of measurement without requiring any artificial transformation and the management of uncertainty by means of comparisons at a qualitative level in terms of the decision maker preferences. Copyright © 2015 Elsevier B.V. All rights reserved.
Davies, J K; Sherriff, N S
2014-03-01
This paper seeks to introduce and analyse the development of the Gradient Evaluation Framework (GEF) to facilitate evaluation of policy actions for their current or future use in terms of their 'gradient friendliness'. In particular, this means their potential to level-up the gradient in health inequalities by addressing the social determinants of health and thereby reducing decision-makers' chances of error when developing such policy actions. A qualitative developmental study to produce a policy-based evaluation framework. The scientific basis of GEF was developed using a comprehensive consensus-building process. This process followed an initial narrative review, based on realist review principles, which highlighted the need for production of a dedicated evaluation framework. The consensus-building process included expert workshops, a pretesting phase, and external peer review, together with support from the Gradient project Scientific Advisory Group and all Gradient project partners, including its Project Steering Committee. GEF is presented as a flexible policy tool resulting from a consensus-building process involving experts from 13 European countries. The theoretical foundations which underpin GEF are discussed, together with a range of practical challenges. The importance of systematic evaluation at each stage of the policy development and implementation cycle is highlighted, as well as the socio-political context in which policy actions are located. GEF offers potentially a major contribution to the public health field in the form of a practical, policy-relevant and common frame of reference for the evaluation of public health interventions that aim to level-up the social gradient in health inequalities. Further research, including the need for practical field testing of GEF and the exploration of alternative presentational formats, is recommended. Copyright © 2013 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less
Evaluation of Alternative Future Strategies for Action.
1981-09-01
Station, CE, Vicksburg, Mississippi 290 Congdon , J. C., 1971. Fish populations of channelized and unchannelized sections of the Chariton River, Mis- souri...130 OCI 06 30. 0 05 c 54 4)IA ) me . u d0 04 0A 0 * 0 41 v 0 AU 0 u 5 IX C o 0% tp 0’ 05 0. 00 4 0 co w a 3 ~ 1- 0 40 CD M @ -A A~W I" v Ito ’ V @5 ’H
2006-06-01
ALTERNATIVES .............................................................. 2-1 2.1 Proposed Action ( Preferred Alternative...effects for all alternatives. This section also identifies the preferred alternative and discusses regulatory requirements and/or best management... Preferred Alternative) 06/23/06 Environmental Assessment Page 2-1 for Immediate Storm Surge Protection for Santa Rosa Island Facilities
7 CFR 650.4 - Definition of terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... action. (40 CFR 1508.18) Mitigation. (40 CFR 1508.20) NEPA process. (40 CFR 1508.21) Scope. (40 CFR 1508... the environmental impacts of the proposed action and alternatives, and a list of agencies and persons... action is a major Federal action significantly affecting the human environment. The environmental...
AAFES Shopping Center Environmental Assessment
2009-08-01
Plan H2S Hydrogen Sulfide SO2 Sulfur Dioxide HWMP Hazardous Waste Management Plan SMW Strategic Missile Wing ICBM Intercontinental Ballistic Missile...the no-action alternative. Land Management and Use. A waiver would be needed prior to construction to change the land use designation from Open...occur under the no-action alternative. Hazardous Materials and Waste Management . No changes to hazardous materials or waste streams would occur
Codeine and its alternates for pain and cough relief*
Eddy, Nathan B.; Friebel, Hans; Hahn, Klaus-Jürgen; Halbach, Hans
1969-01-01
This report—the third of a series on codeine and its alternates for pain and cough relief—presents a detailed review of the physiology and pathophysiology of cough, the methods for the experimental and clinical measurement of the antitussive action of drugs, possible mechanisms of action of antitussive agents, and includes a compilation of experimental results and clinical experience with codeine as an antitussive. PMID:4896168
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... Complementary and Alternative Medicine Announcement of Workshop on Natural Products ACTION: Notice. SUMMARY: As part of its strategic planning process, the National Center for Complementary and Alternative Medicine... attend. Seating is limited. Background: The National Center for Complementary and Alternative Medicine...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Complementary and Alternative Medicine Announcement of Workshop on the Deconstruction of Back Pain ACTION: Notice. SUMMARY: The National Center for Complementary and Alternative Medicine (NCCAM) invites the... Alternative Medicine (NCCAM) was established in 1999 with the mission of exploring complementary and...
Paredes-Chi, Arely Anahy; Castillo-Burguete, María Teresa
2018-06-01
Normal schools in Mexico train teachers for basic level education. Classified as Higher Education Institutions, part of their mandate is to conduct scientific research to improve educational quality. Currently, normal school students can meet graduation requirements by either writing a thesis or reporting on professional practice using Participatory Action Research (PAR). Teachers at normal schools have only limited experience in conducting and supervising PAR projects. With the aim of analyzing the situation and addressing this paradox, we used PAR to develop a plan to train normal school teachers in application of PAR methodology. We present the training proposal and evaluate its results in a pilot phase. These suggest that PAR represents an innovative option for training teachers to conduct research and therefore fulfill part of their responsibilities at normal schools in Mexico. Changes in institutional culture and structure would be required for successful implementation of PAR in this context. Copyright © 2018 Elsevier Ltd. All rights reserved.
Santoro, Domenico; Gehr, Ronald; Bartrand, Timothy A; Liberti, Lorenzo; Notarnicola, Michele; Dell'Erba, Adele; Falsanisi, Dario; Haas, Charles N
2007-07-01
With its potential for low (if any) disinfection byproduct formation and easy retrofit for chlorine contactors, peracetic acid (PAA) or use of PAA in combination with other disinfectant technologies may be an attractive alternative to chlorine-based disinfection. Examples of systems that might benefit from use of PAA are water reuse schemes or plants discharging to sensitive receiving water bodies. Though PAA is in use in numerous wastewater treatment plants in Europe, its chemical kinetics, microbial inactivation rates, and mode of action against microorganisms are not thoroughly understood. This paper presents results from experimental studies of PAA demand, PAA decay, and microbial inactivation, with a complementary modeling analysis. Model results are used to evaluate techniques for measurement of PAA concentration and to develop hypotheses regarding the mode of action of PAA in bacterial inactivation. Kinetic and microbial inactivation rate data were collected for typical wastewaters and may be useful for engineers in evaluating whether to convert from chlorine to PAA disinfection.
ERIC Educational Resources Information Center
Stagell, Ulrica; Almers, Ellen; Askerlund, Per; Apelqvist, Magnus
2014-01-01
Based on the consideration that learning about different action alternatives and strategies are essential parts of ESD, this quantitative study focuses Eco-School teachers' and instructors' views on including different sustainability-promoting actions in teaching practices. Direct actions, and actions that take place in the private sphere were…
Lamas, Alexandre; Miranda, José Manuel; Vázquez, Beatriz; Cepeda, Alberto; Franco, Carlos Manuel
2016-01-01
In recent years, the use of nitrites and sulfites as food preservatives has been a cause for concern due to the health problems that these additives can cause in humans. Natural products have been studied as an alternative, but most of them have hardly been applied in the food industry for technological and economic reasons. In this sense, organic salts such as sodium acetate are a good alternative due to their affordability. Thus, this study evaluated the capacity of sodium nitrite, sodium sulfite, a sodium acetate product (TQI C-6000), and chitosan to inhibit two important foodborne pathogens, Salmonella enterica and Listeria monocytogenes. The MIC of each chemical was in vitro evaluated and their antibacterial action was subsequently checked in situ using minced meat as a food model. MIC values of sodium nitrite (10,000 mg/L) and sodium sulfite (50,000 mg/L) for Salmonella enterica were higher than the values allowed by legislation (450 mg/L for sulfites and 150 mg/L for nitrites). Additionally, the sodium acetate product caused the inhibition of Salmonella enterica and Listeria at a relative low quantity. The two foodborne pathogens were inhibited in the food model with 1% of the sodium acetate product. Additionally, there were no significant differences between sodium nitrite, sodium sulfite, and sodium acetate products in the inhibition of Salmonella enterica and Listeria monocytogenes in the food model. Thus, products based on sodium acetate can be an alternative to traditional preservatives in food products. PMID:28231169
Lamas, Alexandre; Miranda, José Manuel; Vázquez, Beatriz; Cepeda, Alberto; Franco, Carlos Manuel
2016-10-31
In recent years, the use of nitrites and sulfites as food preservatives has been a cause for concern due to the health problems that these additives can cause in humans. Natural products have been studied as an alternative, but most of them have hardly been applied in the food industry for technological and economic reasons. In this sense, organic salts such as sodium acetate are a good alternative due to their affordability. Thus, this study evaluated the capacity of sodium nitrite, sodium sulfite, a sodium acetate product (TQI C-6000), and chitosan to inhibit two important foodborne pathogens, Salmonella enterica and Listeria monocytogenes . The MIC of each chemical was in vitro evaluated and their antibacterial action was subsequently checked in situ using minced meat as a food model. MIC values of sodium nitrite (10,000 mg/L) and sodium sulfite (50,000 mg/L) for Salmonella enterica were higher than the values allowed by legislation (450 mg/L for sulfites and 150 mg/L for nitrites). Additionally, the sodium acetate product caused the inhibition of Salmonella enterica and Listeria at a relative low quantity. The two foodborne pathogens were inhibited in the food model with 1% of the sodium acetate product. Additionally, there were no significant differences between sodium nitrite, sodium sulfite, and sodium acetate products in the inhibition of Salmonella enterica and Listeria monocytogenes in the food model. Thus, products based on sodium acetate can be an alternative to traditional preservatives in food products.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kidman, Raymond; Matthews, Patrick
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.
40 CFR 6.100 - Policy and purpose.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL POLICY ACT AND ASSESSING THE ENVIRONMENTAL EFFECTS ABROAD OF EPA ACTIONS General Provisions for... processes appropriate and careful consideration of all environmental effects of proposed actions, analyze potential environmental effects of proposed actions and their alternatives for public understanding and...
78 FR 31535 - Assistive Technology Alternative Financing Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... DEPARTMENT OF EDUCATION Assistive Technology Alternative Financing Program AGENCY: Office of Special Education and Rehabilitative Services, Department of Education. ACTION: Notice. Catalog of Federal... developed for the Assistive Technology (AT) Alternative Financing Program (AFP) in fiscal year (FY) 2012 to...
Ortiz, Roderick F.
2013-01-01
The purpose of the Arkansas Valley Conduit (AVC) is to deliver water for municipal and industrial use within the boundaries of the Southeastern Colorado Water Conservancy District. Water supplied through the AVC would serve two needs: (1) to supplement or replace existing poor-quality water to communities downstream from Pueblo Reservoir; and (2) to meet a portion of the AVC participants’ projected water demands through 2070. The Bureau of Reclamation (Reclamation) initiated an Environmental Impact Statement (EIS) to address the potential environmental consequences associated with constructing and operating the proposed AVC, entering into a conveyance contract for the Pueblo Dam north-south outlet works interconnect (Interconnect), and entering into a long-term excess capacity master contract (Master Contract). Operational changes, as a result of implementation of proposed EIS alternatives, could change the hydrodynamics and water-quality conditions in Pueblo Reservoir. An interagency agreement was initiated between Reclamation and the U.S. Geological Survey to accurately simulate hydrodynamics and water quality in Pueblo Reservoir for projected demands associated with four of the seven proposed EIS alternatives. The four alternatives submitted to the USGS for scenario simulation included various combinations (action or no action) of the proposed Arkansas Valley Conduit, Master Contract, and Interconnect options. The four alternatives were the No Action, Comanche South, Joint Use Pipeline North, and Master Contract Only. Additionally, scenario simulations were done that represented existing conditions (Existing Conditions scenario) in Pueblo Reservoir. Water-surface elevations, water temperature, dissolved oxygen, dissolved solids, dissolved ammonia, dissolved nitrate, total phosphorus, total iron, and algal biomass (measured as chlorophyll-a) were simulated. Each of the scenarios was simulated for three contiguous water years representing a wet, average, and dry annual hydrologic cycle. Each selected simulation scenario also was evaluated for differences in direct/indirect effects and cumulative effects on a particular scenario. Analysis of the results for the direct/indirect- and cumulative-effects analyses indicated that, in general, the results were similar for most of the scenarios and comparisons in this report focused on results from the direct/indirect-effects analyses. Scenario simulations that represented existing conditions in Pueblo Reservoir were compared to the No Action scenario to assess changes in water quality from current demands (2006) to projected demands in 2070. Overall, comparisons of the results between the Existing Conditions and the No Action scenarios for water-surface elevations, water temperature, and dissolved oxygen, dissolved solids, dissolved ammonia, dissolved nitrate, total phosphorus, and total iron concentrations indicated that the annual median values generally were similar for all three simulated years. Additionally, algal groups and chlorophyll-a concentrations (algal biomass) were similar for the Existing Conditions and the No Action scenarios at site 7B in the epilimnion for the simulated period (Water Year 2000 through 2002). The No Action scenario also was compared individually to the Comanche South, Joint Use Pipeline North, and Master Contract Only scenarios. These comparisons were made to describe changes in the annual median, 85th percentile, or 15th percentile concentration between the No Action scenario and each of the other three simulation scenarios. Simulated water-surface elevations, water temperature, dissolved oxygen, dissolved solids, dissolved ammonia, dissolved nitrate, total phosphorus, total iron, algal groups, and chlorophyll-a concentrations in Pueblo Reservoir generally were similar between the No Action scenario and each of the other three simulation scenarios.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield weremore » determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.« less
1996-05-01
This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit 168 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 168 consists of a group of twelve relatively diverse Corrective Action Sites (CASs 25-16-01, Construction Waste Pile; 25-16-03, MX Construction Landfill; 25-19-02, Waste Disposal Site; 25-23-02, Radioactive Storage RR Cars; 25-23-18, Radioactive Material Storage; 25-34-01, NRDS Contaminated Bunker; 25-34-02, NRDS Contaminated Bunker; CAS 25-23-13, ETL - Lab Radioactive Contamination; 25-99-16, USW G3;more » 26-08-01, Waste Dump/Burn Pit; 26-17-01, Pluto Waste Holding Area; 26-19-02, Contaminated Waste Dump No.2). These CASs vary in terms of the sources and nature of potential contamination. The CASs are located and/or associated wit h the following Nevada Test Site (NTS) facilities within three areas. The first eight CASs were in operation between 1958 to 1984 in Area 25 include the Engine Maintenance, Assembly, and Disassembly Facility; the Missile Experiment Salvage Yard; the Reactor Maintenance, Assembly, and Disassembly Facility; the Radioactive Materials Storage Facility; and the Treatment Test Facility Building at Test Cell A. Secondly, the three CASs located in Area 26 include the Project Pluto testing area that operated from 1961 to 1964. Lastly, the Underground Southern Nevada Well (USW) G3 (CAS 25-99-16), a groundwater monitoring well located west of the NTS on the ridgeline of Yucca Mountain, was in operation during the 1980s. Based on site history and existing characterization data obtained to support the data quality objectives process, contaminants of potential concern (COPCs) for CAU 168 are primarily radionuclide; however, the COPCs for several CASs were not defined. To address COPC uncertainty, the analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. Upon reviewing historical data and current site conditions, it has been determined that no further characterization is required at USW G3 (CAS 25-99-16) to select the appropriate corrective action. A cesium-137 source was encased in cement within the vadous zone during the drilling of the well (CAS 25-99-16). A corrective action of closure in place with a land-use restriction for drilling near USW G3 is appropriate. This corrective action will be documented in the Corrective Action Decision Document (CADD) for CAU 168. The results of the remaining field investigation will support a defensible evaluation of corrective action alternatives for the other CASs within CAU 168 in this CADD.« less
33 CFR 337.7 - Emergency actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the procedures of this regulation to the maximum degree practicable. The district engineer will issue... action would constitute a major Federal action significantly affecting the quality of the human... Environmental Quality about alternative arrangements for compliance with the NEPA in accordance with 40 CFR 1506...
Coman, Emil N; Iordache, Eugen; Dierker, Lisa; Fifield, Judith; Schensul, Jean J; Suggs, Suzanne; Barbour, Russell
2014-05-01
The advantages of modeling the unreliability of outcomes when evaluating the comparative effectiveness of health interventions is illustrated. Adding an action-research intervention component to a regular summer job program for youth was expected to help in preventing risk behaviors. A series of simple two-group alternative structural equation models are compared to test the effect of the intervention on one key attitudinal outcome in terms of model fit and statistical power with Monte Carlo simulations. Some models presuming parameters equal across the intervention and comparison groups were underpowered to detect the intervention effect, yet modeling the unreliability of the outcome measure increased their statistical power and helped in the detection of the hypothesized effect. Comparative Effectiveness Research (CER) could benefit from flexible multi-group alternative structural models organized in decision trees, and modeling unreliability of measures can be of tremendous help for both the fit of statistical models to the data and their statistical power.
Iyioha, Ireh
2011-01-01
This paper examines the (in)compatibility between the diagnostic and therapeutic theories of complementary and alternative medicine (CAM) and a science-based regulatory framework. Specifically, the paper investigates the nexus between statutory legitimacy and scientific validation of health systems, with an examination of its impact on the development of complementary and alternative therapies. The paper evaluates competing theories for validating CAM ranging from the RCT methodology to anthropological perspectives and contends that while the RCT method might be beneficial in the regulation of many CAM therapies, yet dogmatic adherence to this paradigm as the exclusive method for legitimizing CAM will be adverse to the independent development of many CAM therapies whose philosophies and mechanisms of action are not scientifically interpretable. Drawing on history and research evidence to support this argument, the paper sues for a regulatory model that is accommodative of different evidential paradigms in support of a pluralistic healthcare system that balances the imperative of quality assurance with the need to ensure access. PMID:20953428
Kim, Jin-young; Kim, Jong-man; Ko, Eun-young
2014-01-01
The purpose this study was to investigate the effect of action observation physical training (AOPT) on the functioning of the upper extremities in children with cerebral palsy (CP), using an evaluation framework based on that of the International Classification of Functioning, Disability and Health (ICF). The subjects were divided into an AOPT group and a physical training (PT) group. AOPT group practiced repeatedly the actions they observed on video clips, in which normal child performed an action with their upper extremities. PT group performed the same actions as the AOPT group did after observing landscape photographs. The subjects participated in twelve 30-min sessions, 3 days a week, for 4 weeks. Evaluation of upper extremity function using the following: the power of grasp and Modified Ashworth Scale for body functions and structures, a Box and Block test, an ABILHAND-Kids questionnaire, and the WeeFIM scale for activity and participation. Measurements were performed before and after the training, and 2 weeks after the end of training. The results of this study showed that, in comparison with the PT group, the functioning of the upper extremities in the AOPT group was significantly improved in body functions and activity and participation according to the ICF framework. This study demonstrates that AOPT has a positive influence on the functioning of the upper extremities in children with CP. It is suggested that this alternative approach for functioning of the upper extremities could be an effective method for rehabilitation in children with CP. PMID:25061598
Investigating action understanding: inferential processes versus action simulation.
Brass, Marcel; Schmitt, Ruth M; Spengler, Stephanie; Gergely, György
2007-12-18
In our daily life, we continuously monitor others' behaviors and interpret them in terms of goals, intentions, and reasons. Despite their central importance for predicting and interpreting each other's actions, the functional mechanisms and neural circuits involved in action understanding remain highly controversial. Two alternative accounts have been advanced. Simulation theory assumes that we understand actions by simulating the observed behavior through a direct matching process that activates the mirror-neuron circuit. The alternative interpretive account assumes that action understanding is based on specialized inferential processes activating brain areas with no mirror properties. Although both approaches recognize the central role of contextual information in specifying action intentions, their respective accounts of this process differ in significant respects. Here, we investigated the role of context in action understanding by using functional brain imaging while participants observed an unusual action in implausible versus plausible contexts. We show that brain areas that are part of a network involved in inferential interpretive processes of rationalization and mentalization but that lack mirror properties are more active when the action occurs in an implausible context. However, no differential activation was found in the mirror network. Our findings support the assumption that action understanding in novel situations is primarily mediated by an inferential interpretive system rather than the mirror system.
Golet, Gregory H; Roberts, Michael D; Larsen, Eric W; Luster, Ryan A; Unger, Ron; Werner, Gregg; White, Gregory G
2006-06-01
Studies have shown that ecological restoration projects are more likely to gain public support if they simultaneously increase important human services that natural resources provide to people. River restoration projects have the potential to influence many of the societal functions (e.g., flood control, water quality) that rivers provide, yet most projects fail to consider this in a comprehensive manner. Most river restoration projects also fail to take into account opportunities for revitalization of large-scale river processes, focusing instead on opportunities presented at individual parcels. In an effort to avoid these pitfalls while planning restoration of the Sacramento River, we conducted a set of coordinated studies to evaluate societal impacts of alternative restoration actions over a large geographic area. Our studies were designed to identify restoration actions that offer benefits to both society and the ecosystem and to meet the information needs of agency planning teams focusing on the area. We worked with local partners and public stakeholders to design and implement studies that assessed the effects of alternative restoration actions on flooding and erosion patterns, socioeconomics, cultural resources, and public access and recreation. We found that by explicitly and scientifically melding societal and ecosystem perspectives, it was possible to identify restoration actions that simultaneously improve both ecosystem health and the services (e.g., flood protection and recreation) that the Sacramento River and its floodplain provide to people. Further, we found that by directly engaging with local stakeholders to formulate, implement, and interpret the studies, we were able to develop a high level of trust that ultimately translated into widespread support for the project.
25 CFR 42.4 - What are alternative dispute resolution processes?
Code of Federal Regulations, 2010 CFR
2010-04-01
... What are alternative dispute resolution processes? Alternative dispute resolution (ADR) processes are... action. (a) ADR processes may: (1) Include peer adjudication, mediation, and conciliation; and (2... that these practices are readily identifiable. (b) For further information on ADR processes and how to...
25 CFR 42.4 - What are alternative dispute resolution processes?
Code of Federal Regulations, 2011 CFR
2011-04-01
... What are alternative dispute resolution processes? Alternative dispute resolution (ADR) processes are... action. (a) ADR processes may: (1) Include peer adjudication, mediation, and conciliation; and (2... that these practices are readily identifiable. (b) For further information on ADR processes and how to...
10 CFR 51.45 - Environmental report.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the proposal and the alternatives should be presented in comparative form; (4) The relationship... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report. 51.45 Section 51.45 Energy NUCLEAR...; (3) Alternatives to the proposed action. The discussion of alternatives shall be sufficiently...
48 CFR 206.202 - Establishing or maintaining alternative sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Open Competition After Exclusion of Sources 206.202 Establishing or maintaining alternative sources. (a) Agencies may use this authority to totally or partially exclude a particular source from a contract action... maintaining alternative sources. 206.202 Section 206.202 Federal Acquisition Regulations System DEFENSE...
Schiller, Viktoria; Wichmann, Arne; Kriehuber, Ralf; Muth-Köhne, Elke; Giesy, John P; Hecker, Markus; Fenske, Martina
2013-01-01
Assessment of endocrine disruption currently relies on testing strategies involving adult vertebrates. In order to minimize the use of animal tests according to the 3Rs principle of replacement, reduction and refinement, we propose a transcriptomics and fish embryo based approach as an alternative to identify and analyze an estrogenic activity of environmental chemicals. For this purpose, the suitability of 48 h and 7 days post-fertilization zebrafish and medaka embryos to test for estrogenic disruption was evaluated. The embryos were exposed to the phytoestrogen genistein and subsequently analyzed by microarrays and quantitative real-time PCR. The functional analysis showed that the genes affected related to multiple metabolic and signaling pathways in the early fish embryo, which reflect the known components of genistein's mode of actions, like apoptosis, estrogenic response, hox gene expression and steroid hormone synthesis. Moreover, the transcriptomic data also suggested a thyroidal mode of action and disruption of the nervous system development. The parallel testing of two fish species provided complementary data on the effects of genistein at gene expression level and facilitated the separation of common from species-dependent effects. Overall, the study demonstrated that combining fish embryo testing with transcriptomics can deliver abundant information about the mechanistic effects of endocrine disrupting chemicals, rendering this strategy a promising alternative approach to test for endocrine disruption in a whole organism in-vitro scale system. Copyright © 2012 Elsevier Inc. All rights reserved.
Training needs for toxicity testing in the 21st century: a survey-informed analysis.
Lapenna, Silvia; Gabbert, Silke; Worth, Andrew
2012-12-01
Current training needs on the use of alternative methods in predictive toxicology, including new approaches based on mode-of-action (MoA) and adverse outcome pathway (AOP) concepts, are expected to evolve rapidly. In order to gain insight into stakeholder preferences for training, the European Commission's Joint Research Centre (JRC) conducted a single-question survey with twelve experts in regulatory agencies, industry, national research organisations, NGOs and consultancies. Stakeholder responses were evaluated by means of theory-based qualitative data analysis. Overall, a set of training topics were identified that relate both to general background information and to guidance for applying alternative testing methods. In particular, for the use of in silico methods, stakeholders emphasised the need for training on data integration and evaluation, in order to increase confidence in applying these methods for regulatory purposes. Although the survey does not claim to offer an exhaustive overview of the training requirements, its findings support the conclusion that the development of well-targeted and tailor-made training opportunities that inform about the usefulness of alternative methods, in particular those that offer practical experience in the application of in silico methods, deserves more attention. This should be complemented by transparent information and guidance on the interpretation of the results generated by these methods and software tools. 2012 FRAME.
Faculty Planning and Affirmative Action
ERIC Educational Resources Information Center
Linnell, Robert H.; Gray, Paul
1977-01-01
The use of a model to examine the impact of affirmative action policies on the female/male ratio of a faculty of natural sciences is reported. Increased analysis and detailed study of suggested alternatives can lead to better resolution of the problems and potentials of affirmative action programs. (LBH)
76 FR 61090 - Endangered and Threatened Species; Counterpart Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
...), Interior. ACTION: Notice of availability. SUMMARY: The U.S. Forest Service and Bureau of Land Management..., National Fire Plan Counterpart Regulation Alternative Consultation Agreements (ACAs). DATES: This is... actions that support the National Fire Plan. Upon entering into an ACA with the Services, action agencies...
43 CFR 11.84 - Damage determination phase-implementation guidance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the damage assessment. (2) Natural resource damages are the residual to be determined by incorporating... estimates of natural recovery rates as well as recovery rates that reflect management actions or resource... actions or resource acquisitions, including a “No Action-Natural Recovery” alternative. After the recovery...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-08-10
This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-04
... alternative (Alternative 2) for implementation based on multiple environmental and social factors, including... review of the alternatives and their environmental consequences. Implementation of this decision entails... implementation of conservation actions and measures contained in the CCAA, and social and economic considerations...
Effect of Iboga Alkaloids on µ-Opioid Receptor-Coupled G Protein Activation
Antonio, Tamara; Childers, Steven R.; Rothman, Richard B.; Dersch, Christina M.; King, Christine; Kuehne, Martin; Bornmann, William G.; Eshleman, Amy J.; Janowsky, Aaron; Simon, Eric R.; Reith, Maarten E. A.; Alper, Kenneth
2013-01-01
Objective The iboga alkaloids are a class of small molecules defined structurally on the basis of a common ibogamine skeleton, some of which modify opioid withdrawal and drug self-administration in humans and preclinical models. These compounds may represent an innovative approach to neurobiological investigation and development of addiction pharmacotherapy. In particular, the use of the prototypic iboga alkaloid ibogaine for opioid detoxification in humans raises the question of whether its effect is mediated by an opioid agonist action, or if it represents alternative and possibly novel mechanism of action. The aim of this study was to independently replicate and extend evidence regarding the activation of μ-opioid receptor (MOR)-related G proteins by iboga alkaloids. Methods Ibogaine, its major metabolite noribogaine, and 18-methoxycoronaridine (18-MC), a synthetic congener, were evaluated by agonist-stimulated guanosine-5´-O-(γ-thio)-triphosphate ([35S]GTPγS) binding in cells overexpressing the recombinant MOR, in rat thalamic membranes, and autoradiography in rat brain slices. Results And Significance In rat thalamic membranes ibogaine, noribogaine and 18-MC were MOR antagonists with functional Ke values ranging from 3 uM (ibogaine) to 13 uM (noribogaine and 18MC). Noribogaine and 18-MC did not stimulate [35S]GTPγS binding in Chinese hamster ovary cells expressing human or rat MORs, and had only limited partial agonist effects in human embryonic kidney cells expressing mouse MORs. Ibogaine did not did not stimulate [35S]GTPγS binding in any MOR expressing cells. Noribogaine did not stimulate [35S]GTPγS binding in brain slices using autoradiography. An MOR agonist action does not appear to account for the effect of these iboga alkaloids on opioid withdrawal. Taken together with existing evidence that their mechanism of action also differs from that of other non-opioids with clinical effects on opioid tolerance and withdrawal, these findings suggest a novel mechanism of action, and further justify the search for alternative targets of iboga alkaloids. PMID:24204784
Effect of Iboga alkaloids on µ-opioid receptor-coupled G protein activation.
Antonio, Tamara; Childers, Steven R; Rothman, Richard B; Dersch, Christina M; King, Christine; Kuehne, Martin; Bornmann, William G; Eshleman, Amy J; Janowsky, Aaron; Simon, Eric R; Reith, Maarten E A; Alper, Kenneth
2013-01-01
The iboga alkaloids are a class of small molecules defined structurally on the basis of a common ibogamine skeleton, some of which modify opioid withdrawal and drug self-administration in humans and preclinical models. These compounds may represent an innovative approach to neurobiological investigation and development of addiction pharmacotherapy. In particular, the use of the prototypic iboga alkaloid ibogaine for opioid detoxification in humans raises the question of whether its effect is mediated by an opioid agonist action, or if it represents alternative and possibly novel mechanism of action. The aim of this study was to independently replicate and extend evidence regarding the activation of μ-opioid receptor (MOR)-related G proteins by iboga alkaloids. Ibogaine, its major metabolite noribogaine, and 18-methoxycoronaridine (18-MC), a synthetic congener, were evaluated by agonist-stimulated guanosine-5´-O-(γ-thio)-triphosphate ([(35)S]GTPγS) binding in cells overexpressing the recombinant MOR, in rat thalamic membranes, and autoradiography in rat brain slices. In rat thalamic membranes ibogaine, noribogaine and 18-MC were MOR antagonists with functional Ke values ranging from 3 uM (ibogaine) to 13 uM (noribogaine and 18MC). Noribogaine and 18-MC did not stimulate [(35)S]GTPγS binding in Chinese hamster ovary cells expressing human or rat MORs, and had only limited partial agonist effects in human embryonic kidney cells expressing mouse MORs. Ibogaine did not did not stimulate [(35)S]GTPγS binding in any MOR expressing cells. Noribogaine did not stimulate [(35)S]GTPγS binding in brain slices using autoradiography. An MOR agonist action does not appear to account for the effect of these iboga alkaloids on opioid withdrawal. Taken together with existing evidence that their mechanism of action also differs from that of other non-opioids with clinical effects on opioid tolerance and withdrawal, these findings suggest a novel mechanism of action, and further justify the search for alternative targets of iboga alkaloids.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews; Christy Sloop
2012-02-01
Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred tomore » as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A. Because CAU 569 is a complicated site containing many types of releases, it was agreed during the data quality objectives (DQO) process that these sites will be grouped. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the DQOs developed on September 26, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 569. The presence and nature of contamination at CAU 569 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample locations to the dose-based final action level (FAL). The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. A field investigation will be performed to define any areas where TED exceeds the FAL and to determine whether contaminants of concern are present at the site from other potential releases. The presence and nature of contamination from other types of releases (e.g., excavation, migration, and any potential releases discovered during the investigation) will be evaluated using soil samples collected from biased locations indicating the highest levels of contamination. Appendix A provides a detailed discussion of the DQO methodology and the objectives specific to each study group.« less
2003-10-01
treatment plant . 2.3 DESCRIPTION OF THE NO ACTION ALTERNATIVE Under the No Action alternative, no new permanent parking lots would be constructed and...the golf course area where reclaimed water from the on-base wastewater treatment plant is applied by spray irrigation. Groundwater quality has been...economic impacts. The area includes all or part of Hillsborough, Pinellas , Polk, Pasco, Hardee, Manatee, Sarasota, and DeSoto Counties. According to
ERIC Educational Resources Information Center
Sandoval-Lucero, Elena; Maes, Johanna B.; Pappas, Georgia
2013-01-01
Action research is a method of organizational development and improvement often used in educational settings. This study implemented an action research process in an alternative school that serves students with significant special needs. The action research process was implemented by classroom teams who developed a research question, collected and…
External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sam Marutzky
2010-09-01
An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked withmore » addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studies—the next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in models of flow and transport in the Frenchman Flat except for a few deficiencies described in the report. Finally, the peer review team concludes that the UGTA subproject has explored a wide range of variations in assumptions, methods, and data, and should proceed to the next stage with an emphasis on monitoring studies. The corrective action strategy, as described in the Federal Facility Agreement and Consent Order, states that the groundwater flow and transport models for each corrective action unit will consider, at a minimum, the following: • Alternative hydrostratigraphic framework models of the modeling domain. • Uncertainty in the radiological and hydrological source terms. • Alternative models of recharge. • Alternative boundary conditions and groundwater flows. • Multiple permissive sets of calibrated flow models. • Probabilistic simulations of transport using plausible sets of alternative framework and recharge models, and boundary and groundwater flows from calibrated flow models. • Ensembles of forecasts of contaminant boundaries. • Sensitivity and uncertainty analyses of model outputs. The peer review team finds that these minimum requirements have been met. While the groundwater modeling and uncertainty analyses have been quite detailed, the peer review team has identified several modeling-related issues that should be addressed in the next phase of the corrective action activities: • Evaluating and using water-level gradients from the pilot wells at the Area 5 Radioactive Waste Management Site in model calibration. • Re-evaluating the use of geochemical age-dating data to constrain model calibrations. • Developing water budgets for the alluvial and upper volcanic aquifer systems in Frenchman Flat. • Considering modeling approaches in which calculated groundwater flow directions near the water table are not predetermined by model boundary conditions and areas of recharge, all of which are very uncertain. • Evaluating local-scale variations in hydraulic conductivity on the calculated contaminant boundaries. • Evaluating the effects of non-steady-state flow conditions on calculated contaminant boundaries, including the effects of long-term declines in water levels, climatic change, and disruption of groundwater system by potential earthquake faulting along either of the two major controlling fault zones in the flow system (the Cane Spring and Rock Valley faults). • Considering the use of less-complex modeling approaches. • Evaluating the large change in water levels in the vicinity of the Frenchman Flat playa and developing a conceptual model to explain these water-level changes. • Developing a long-term groundwater level monitoring program for Frenchman Flat with regular monitoring of water levels at key monitoring wells. Despite these reservations, the peer review team strongly believes that the UGTA subproject should proceed to the next stage.« less
Climate Change Action Plan The Rhode Island Executive Climate Change Coordinating Council (Council ) and the State Chief Resiliency Officer will develop a statewide Action Plan to Stand Up to Climate
Cypriot nurses' knowledge and attitudes towards alternative medicine.
Zoe, Roupa; Charalambous, Charalambos; Popi, Sotiropoulou; Maria, Rekleiti; Aris, Vasilopoulos; Agoritsa, Koulouri; Evangelia, Kotrotsiou
2014-02-01
To investigate Cypriot nurses' knowledge and attitude towards alternative treatments. Two hundred randomly selected registered Nurses from public hospitals in Cyprus were administered an anonymous self-report questionnaire with closed-type questions. The particular questionnaire has previously been used in similar surveys. Six questions referred to demographic data and 14 questions to attitudes and knowledge towards alternative medicine. One hundred and thirty-eight questionnaires were adequately completed and evaluated. Descriptive and inferential statistics was performed. SPSS 17.0 was used. Statistical significance was set at p < 0.05. Over 1/3 of our sample nurses reported that they had turned to some form of alternative treatment at some point in their lives in order to deal with a certain medical situation. Most of these nurses who reported some knowledge on specific alternative treatment methods, (75.9%) also reported using such methods within their clinical practice. The nurses who had received some form of alternative treatment reported using them more often in their clinical practice, in comparison to those who had never received such treatment (Mann-Whitney U = 1137, p = 0.006). The more frequently nurses used alternative treatment in their clinical practice, the more interested they got in expanding their knowledge on the subject (Pearson's r = 0.250, p = 0.006). Most nurses are familiar with alternative medicine and interested in expanding their knowledge on subject, despite the fact that they do not usually practice it. Special education and training as well as legislative actions are necessary for alternative medicine to be broadly accepted. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planningmore » Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that fosters low-growing plant communities.« less
On the Alternate Stirring Mode of F-EMS for Bloom Continuous Castings
NASA Astrophysics Data System (ADS)
Sun, Haibo; Li, Liejun; Ye, Dexin; Wu, Xuexing
2018-05-01
Local solute transportation behaviors under different alternate stirring parameters of final electromagnetic stirring (F-EMS) and their influences on the internal quality of the as-cast bloom are compared and evaluated based on a developed coupled model of electromagnetism, heat, and solute transport. To this end, plant trials were conducted in Shaoguan Steel, China. Under the action of F-EMS, a negative segregation band in an ellipse shape is observed at the central area of strand cross section, where the minimum carbon segregation degree is decreased from 0.98 to 0.84 as the stirring duration increases from 15 to 35 seconds in the alternate stirring mode, while it is reduced to 0.805 in the continuous stirring mode. The white band and shrinkage cavity are simultaneously observed at strand center under the conditions of continuous stirring mode, and alternate stirring mode with a stirring period of 35 seconds because of the local over-sustaining melt rotation. In contrast, the V-shape porosity belt width and strand center segregation fluctuation range increase from 60 to 90 mm and from 0.12 to 0.30, respectively, as the stirring duration is reduced from 25 to 15 seconds in the alternate stirring mode because of the poor mixing of the local melt at the strand center.
40 CFR 93.155 - Reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determination on the action. If the action has multi-regional or national impacts (e.g., the action will cause....164 must provide to the appropriate EPA Regional Office(s), State and local air quality agencies, any... Regions), the Federal agency, as an alternative to sending it to EPA Regional Offices, can provide the...
40 CFR 93.155 - Reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determination on the action. If the action has multi-regional or national impacts (e.g., the action will cause....164 must provide to the appropriate EPA Regional Office(s), State and local air quality agencies, any... Regions), the Federal agency, as an alternative to sending it to EPA Regional Offices, can provide the...
40 CFR 93.155 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determination on the action. If the action has multi-regional or national impacts (e.g., the action will cause....164 must provide to the appropriate EPA Regional Office(s), State and local air quality agencies, any... Regions), the Federal agency, as an alternative to sending it to EPA Regional Offices, can provide the...
Training for Nonviolent Action.
ERIC Educational Resources Information Center
Olson, Theodore W.; Shivers, Lynne
The theory and practice of nonviolent action training as it exists to date are reviewed in this pamphlet. A response to a renewal of interest in alternative forms of social action, the pamphlet results specifically from an international seminar of experienced organizers and trainers held at Preston Patrick, Westmorland, England, June 27 - July 2,…
Groups' Actions Trump Injunctive Reaction in an Incidental Observation by Young Children
Turner, Cameron R.; Nielsen, Mark; Collier-Baker, Emma
2014-01-01
Children's ability to use social information to direct their behavior is key to their survival and development. However, in observing adult behavior, children are confronted with multiple forms of social information that may vary in reliability and adaptiveness. Two of the most well established biases influencing human behavior are: (1) following the majority (majority influence or conformity); and (2) the use of emotional signals. The current experiment aimed to evaluate how children respond when both information about the majority behavior of a group (descriptive norm) and attitudes of the group towards a behavior (injunctive norm, expressed through an emotional reaction) are present and what happens when they are in conflict. We used a method designed to mimic the manner in which children might observe group members' behavior during development. Novel apparatuses were constructed for which there were two discrete actions that could be performed to retrieve a reward. Three-year-olds observed four adults demonstrating one set of actions, followed by a fifth adult who presented an alternative set of actions. The first four adults' injunctive responses to this fifth adult's actions were manipulated between-groups: positive, negative, or neutral. It was found that children preferred to copy the majority action, regardless of the injunctive reaction of the group. We argue that this affirms the adaptive utility of copying the majority. PMID:25198163
Selective disruption of the AKAP signaling complexes.
Kennedy, Eileen J; Scott, John D
2015-01-01
Synthesis of the second messenger cAMP activates a variety of signaling pathways critical for all facets of intracellular regulation. Protein kinase A (PKA) is the major cAMP-responsive effector. Where and when this enzyme is activated has profound implications on the cellular role of PKA. A-Kinase Anchoring Proteins (AKAPs) play a critical role in this process by orchestrating spatial and temporal aspects of PKA action. A popular means of evaluating the impact of these anchored signaling events is to biochemically interfere with the PKA-AKAP interface. Hence, peptide disruptors of PKA anchoring are valuable tools in the investigation of local PKA action. This article outlines the development of PKA isoform-selective disruptor peptides, documents the optimization of cell-soluble peptide derivatives, and introduces alternative cell-based approaches that interrogate other aspects of the PKA-AKAP interface.
[Aedes aegypti control strategies: a review].
Zara, Ana Laura de Sene Amâncio; Santos, Sandra Maria Dos; Fernandes-Oliveira, Ellen Synthia; Carvalho, Roberta Gomes; Coelho, Giovanini Evelim
2016-01-01
to describe the main strategies to control Aedes aegypti, with emphasis on promising technological innovations for use in Brazil. this study is a non-systematic review of the literature. several technologies have been developed as alternatives in the control of Ae. aegypti, using different mechanisms of action, such as selective monitoring of the infestation, social interventions, dispersing insecticides, new biological control agents and molecular techniques for population control of mosquitoes, also considering the combination between them. Evolving technologies require evaluation of the effectiveness, feasibility and costs of implementation strategies as complementary to the actions already recommended by the National Program for Dengue Control. the integration of different compatible and effective vector control strategies, considering the available technologies and regional characteristics, appears to be a viable method to try to reduce the infestation of mosquitoes and the incidence of arbovirus transmitted by them.
78 FR 68783 - Refuge Alternatives for Underground Coal Mines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... Alternatives for Underground Coal Mines AGENCY: Mine Safety and Health Administration, Labor. ACTION: Reopen... coal mines. The U.S. Court of Appeals for the District of Columbia Circuit remanded a training... for refuge alternatives in underground coal mines. On January 13, 2009, the United Mine Workers of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... effects that would result from use of stationing and training capacity, land use changes, and training... 4 stationing action; Alternative 5 land use change; and Alternative 4 training infrastructure... stationing package. Alternative 5 land use changes allow fixed sites (e.g., military bivouac), mission...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... Alternative Contact Strategy Test AGENCY: U.S. Census Bureau, Commerce. ACTION: Notice. SUMMARY: The...-response. This research will be conducted through a series of projects and tests throughout the decade... 2013 Alternative Contact Strategy Test is the first test to support this research. The Census Bureau...
76 FR 36571 - Bowdoin National Wildlife Refuge Complex, Malta, MT; Comprehensive Conservation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-22
... fishery due to high salinity levels or shallow water depth. Excluding Holm WPA, the remaining complex is... Thibadeau, and five alternatives for addressing the salinity and blowing salts issue on Bowdoin National... Alternative 2--Divestiture (proposed action). Alternatives for Salinity and Blowing Salts on Bowdoin National...
Old and new controversies in the alternative treatment of attention-deficit hyperactivity disorder.
Rojas, Neal L; Chan, Eugenia
2005-01-01
Use of complementary and alternative medicine (CAM) for treatment of attention-deficit hyperactivity disorder (ADHD) has become widespread in both referral and primary care populations. We review the purported mechanism of action and available evidence for selected CAM therapies for ADHD. Enduring controversies, such as elimination of artificial food additives, colors, and/or preservatives; the effect of sugar on behavior in children; and the use of EEG biofeedback, have been well studied but lack support as effective sole treatments for ADHD. The initial evidence for some emerging CAM therapies, such as essential fatty acid supplementation, yoga, massage, homeopathy, and green outdoor spaces, suggests potential benefits as part of an overall ADHD treatment plan. More rigorously designed studies are needed to evaluate their effectiveness as single therapy for ADHD. Copyright 2005 Wiley-Liss, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2010-03-01
Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Correctivemore » Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.« less
36 CFR 220.7 - Environmental assessment and decision notice.
Code of Federal Regulations, 2013 CFR
2013-07-01
... modifications and incremental design features developed through the analysis process to develop the alternatives... proposed action and any alternatives together in a comparative description or describe the impacts of each...
36 CFR 220.7 - Environmental assessment and decision notice.
Code of Federal Regulations, 2012 CFR
2012-07-01
... modifications and incremental design features developed through the analysis process to develop the alternatives... proposed action and any alternatives together in a comparative description or describe the impacts of each...
36 CFR 220.7 - Environmental assessment and decision notice.
Code of Federal Regulations, 2014 CFR
2014-07-01
... modifications and incremental design features developed through the analysis process to develop the alternatives... proposed action and any alternatives together in a comparative description or describe the impacts of each...
36 CFR 220.7 - Environmental assessment and decision notice.
Code of Federal Regulations, 2011 CFR
2011-07-01
... modifications and incremental design features developed through the analysis process to develop the alternatives... proposed action and any alternatives together in a comparative description or describe the impacts of each...
36 CFR 220.7 - Environmental assessment and decision notice.
Code of Federal Regulations, 2010 CFR
2010-07-01
... modifications and incremental design features developed through the analysis process to develop the alternatives... proposed action and any alternatives together in a comparative description or describe the impacts of each...
DoD use of Domestically-Produced Alternative Fuels and Alternative Fuel Vehicles
2014-04-10
based fuels and biodiesel , in DoD vehicles; (2) current and projected actions by the DoD to increase the use of alternative fuels in vehicles; (3) a...fuels and vehicles. 15. SUBJECT TERMS alternative fuel infrastructure, electric vehicles, biofuels, ethanol, biodiesel , drop-in, synthetic fuel...of: (1) use and potential use of domestically-produced alternative fuels including but not limited to, natural gas based fuels and biodiesel , in DoD
40 CFR 93.156 - Public participation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Environmental Policy Act (NEPA) process. If the action has multi-regional or national impacts (e.g., the action...-regional or national impacts, the Federal agency, as an alternative, can publish the notice in the Federal...
Emergency Response Alternatives
Based on the National Contingency Plan, EPA defines the following types: classic emergencies, requiring on-site activities within minutes/hours; time-critical actions, which must occur within 6 months; and non-time-critical actions, which can take longer.
2006-06-08
would sublease the land from Peterson AFB, and would maintain and manage the housing area for a minimum of 723 military families for 50 years. Under...housing area for a minimum of 723 military families for 50 years. Under the no action alternative, the Air Force would not implement the MHPI at...Peterson AFB, and would maintain and manage the housing area for a minimum of 723 military families for 50 years. No Action Alternative Under the no
The Demands for Orderlines in the Cuban Revolution in the 1980s,
1981-01-01
old PSP member, who has been cited numerous times within his industry for his good work, and who was honored as "National Hero of Labor" for five...34affirmative action" for women . Women accounted for only 5.4% of the full members of the 1975 Central Committee, but for almost half of the dozen alternates...Only the high share (though small namber) of the women alternates served as a glimmer of affirmative action politics in the 1975 Central Committee
Environmental Assessment for the NASA First Response Facility
NASA Technical Reports Server (NTRS)
Kennedy, Carolyn
2003-01-01
NASA intends to construct a First Response Facility for integrated emergency response and health management. This facility will consolidate the Stennis Space Center fire department, medical clinic, security operations, emergency operations and the energy management and control center. The alternative considered is the "No Action Alternative". The proposed action will correct existing operational weaknesses and enhance capabilities to respond to medical emergencies and mitigate any other possible threats. Environmental impacts include are emissions, wetlands disturbance, solid waste generation, and storm water control.
2012-06-01
information indicate that at least one designated use 22 (e.g., recreation, support of aquatic life and coral reef conservation, fishing and the consumption ...34 This EIS provides an analysis of environmental effects associated with the proposed action. The 35 following summarizes the formal NEPA process...alternatives and the No Action Alternative have been summarized in Table ES-2. A detailed analysis of 28 effects is provided in Chapter 4. 29 ES 7
Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A
2018-01-01
Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018;14:43-62. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).
78 FR 50434 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... Screening Form. Abstract: NEPA requires that each Federal agency to examine the impact of its actions (including the actions of grantees using grant funds) on the human environment, to look at potential alternatives to that action, and to inform both decision-makers and the public of those impacts through a...
78 FR 37133 - National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... systems that would allow owners and operators at existing sources to monitor quarterly using a leak action... option, which requires monitoring monthly at a leak action level defined as a total strippable... monitoring alternative and the modeling indicates that quarterly monitoring at the lower leak action level...
NASA Astrophysics Data System (ADS)
Khoudeir, A.; Montemayor, R.; Urrutia, Luis F.
2008-09-01
Using the parent Lagrangian method together with a dimensional reduction from D to (D-1) dimensions, we construct dual theories for massive spin two fields in arbitrary dimensions in terms of a mixed symmetry tensor TA[A1A2…AD-2]. Our starting point is the well-studied massless parent action in dimension D. The resulting massive Stueckelberg-like parent actions in (D-1) dimensions inherit all the gauge symmetries of the original massless action and can be gauge fixed in two alternative ways, yielding the possibility of having a parent action with either a symmetric or a nonsymmetric Fierz-Pauli field eAB. Even though the dual sector in terms of the standard spin two field includes only the symmetrical part e{AB} in both cases, these two possibilities yield different results in terms of the alternative dual field TA[A1A2…AD-2]. In particular, the nonsymmetric case reproduces the Freund-Curtright action as the dual to the massive spin two field action in four dimensions.
78 FR 48591 - Refuge Alternatives for Underground Coal Mines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Administration 30 CFR Parts 7 and 75 Refuge Alternatives for Underground Coal Mines; Proposed Rules #0;#0;Federal... Underground Coal Mines AGENCY: Mine Safety and Health Administration, Labor. ACTION: Limited reopening of the... for miners to deploy and use refuge alternatives in underground coal mines. The U.S. Court of Appeals...
Code of Federal Regulations, 2010 CFR
2010-07-01
... repair, the person conducting the maintenance or repair shall make a record of all corrective action..., maintenance and repair of refuge alternatives and components. 75.1508 Section 75.1508 Mineral Resources MINE..., maintenance and repair of refuge alternatives and components. (a) Persons examining, maintaining, or repairing...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-19
... associated with the construction and operation of the Glassboro-Camden Line (GCL) light rail system, as well as assess and document a No-Action Alternative and a Transportation System Management (TSM... and benefits of the GCL alternatives. Transportation System Management (TSM) Alternative: The TSM...
ERIC Educational Resources Information Center
Wragg, Paul H.; Allen, Rodney F.
Four lessons for secondary school geography instruction focus on creative thinking through generating alternatives, imagining consequences, generating analogies, and creating products. In lesson 1 students lay out alternatives to solving a problem and decide the best course of action. Suggested activities include consideration of alternatives in…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... local governments. DATES: Comment Period: To ensure consideration, we must receive your written comments... describes the proposed action and possible alternatives, and analyzes the effects of the alternatives on the... avoidance, minimization, and mitigation measures) and other alternatives in the draft EA are adequate to...
75 FR 17754 - Certificate of Alternative Compliance for the Lift Boat GARY CHIASSON ELEVATOR
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... Compliance for the Lift Boat GARY CHIASSON ELEVATOR AGENCY: Coast Guard, DHS. ACTION: Notice. SUMMARY: The Coast Guard announces that a Certificate of Alternative Compliance was issued for the lift boat GARY... for the lift boat GARY CHIASSON ELEVATOR. The Certificate of Alternative Compliance permits the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-24
... alternative (current management and public use (proposed action) practices) use alternative alternative... filters to insure no Ogallala water is used. Lakebed Management Cooperatively farm 581 Reduce all farming Remove all farming acres of the dry activities to activity from the lakebed. approximately half of refuge...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... demolition activities, substantial excavation and grading, installation of a geohazard soil stabilization... human environment. The No-Action Alternative was analyzed and assumes the newly proposed actions would...
36 CFR 220.5 - Environmental impact statement and record of decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... application of herbicides by helicopter on a major utility corridor to control unwanted vegetation. (iii... action and one or more alternatives to the proposed action may include adaptive management. An adaptive...
36 CFR 220.5 - Environmental impact statement and record of decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... application of herbicides by helicopter on a major utility corridor to control unwanted vegetation. (iii... action and one or more alternatives to the proposed action may include adaptive management. An adaptive...
36 CFR 220.5 - Environmental impact statement and record of decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... application of herbicides by helicopter on a major utility corridor to control unwanted vegetation. (iii... action and one or more alternatives to the proposed action may include adaptive management. An adaptive...
36 CFR 220.5 - Environmental impact statement and record of decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... application of herbicides by helicopter on a major utility corridor to control unwanted vegetation. (iii... action and one or more alternatives to the proposed action may include adaptive management. An adaptive...
Environmental analysis of Acid/middle Pueblo Canyon, Los Alamos, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferenbaugh, R.W.; Buhl, T.E.; Stoker, A.K.
1982-08-01
The radiological survey of the former radioactive waste treatment plant site (TA-45), Acid Canyon, and Pueblo Canyon found residual radioactivity at the site itself and in the channel and banks of Acid, Pueblo, and lower Los Alamos Canyons, all the way to the Rio Grande. The largest reservoir of radioactive material is in lower Pueblo Canyon, which is on DOE property. The only areas where residual radioactivity exceeds the proposed cleanup criteria are at the former vehicle decontamination facility, located between the former treatment plant site and Acid Canyon, around the former untreated waste outfall and for a short distancemore » below, and in two small areas farther down in Acid Canyon. The three alternatives proposed are (1) to take no action, (2) to fence the areas where the residual radioactivity exceeds the proposed criteria (minimal action), and (3) to clean up the former vehicle decontamination facility and around the former untreated waste outfall. Calculations based on actual measurements indicate that the annual dose at the location having the greatest residual radioactivity would be about 12% of the applicable guideline. Most doses are much smaller than that. No environmental impacts are associated with either the no-action or minimal action alternatives. The impact associated with the cleanup alternative is very small. The preferred alternative is to clean up the areas around the former vehicle decontamination facility and the untreated waste outfall. This course of action is recommended not because of any real danger associated with the residual radioactivity, but rather because the cleanup operation is a minor effort and would conform with the ALARA (as low as reasonably achievable) philosophy.« less
Final Environmental Assessment for Shared Use Paths (SUP), Eglin Air Force Base, Florida
2011-07-01
NEPA; 40 Code of Federal Regulations [CFR] 1500-1508); the USAF environmental impact analysis process as effectuated by 32 CFR Part 989; and DoD...alternatives were considered, but not carried forward for analysis . Alternative B This alternative would consist of constructing a 10’ wide SUP...EA Section 2.3.1, page 12) No-Action Alternative This alternative also was carried forward for analysis . (EA Section 2.4.1, page 16) ENVIRONMENTAL
Theoretical orientations in environmental planning: An inquiry into alternative approaches
NASA Astrophysics Data System (ADS)
Briassoulis, Helen
1989-07-01
In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.
Bacteriophage use to control Salmonella biofilm on surfaces present in chicken slaughterhouses.
Garcia, Keila Carolina de Ornellas Dutka; Corrêa, Isadora Mainieri de Oliveira; Pereira, Larissa Quinto; Silva, Tarcísio Macedo; Mioni, Mateus de Souza Ribeiro; Izidoro, Ana Carolina de Moraes; Bastos, Igor Henrique Vellano; Gonçalves, Guilherme Augusto Marietto; Okamoto, Adriano Sakai; Andreatti Filho, Raphael Lucio
2017-09-01
Foodborne diseases represent a major risk to public health worldwide. Pathogenic bacteria can live in the form of biofilm within the food industry, providing a permanent source of contamination. The aim of this study was to evaluate the influence of the types of adhesion surfaces on Salmonella biofilm formation at eight different times, and analyze the action time of a bacteriophage pool on established biofilms. Most of the samples used were classified as weak biofilm producers, with serovars Enteritidis and Heidelberg showing the highest frequency of biofilm formation. Glass and stainless steel surfaces significantly favored biofilm formation at 60 and 36 h of incubation respectively, but the polyvinyl chloride surface did not favor biofilm production, suggesting that the type of material may interfere with production. The bacteriophage pool action period focused on 3 h, but treatment of 9 h on glass surface biofilms was superior to other treatments because it affected the largest number of samples. These results suggests that some surface types and Salmonella serotypes may promote biofilm formation and indicate bacteriophages as an alternative to control biofilms. But further studies are required to prove the effectiveness and safety of bacteriophage therapy as an alternative in the antimicrobial control in the processing plants. © 2017 Poultry Science Association Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-09-11
The Department of Energy (DOE) proposes to eliminate industrial effluent from 27 outfalls at Los Alamos National Laboratory (LANL). The Proposed Action includes both simple and extensive plumbing modifications, which would result in the elimination of industrial effluent being released to the environment through 27 outfalls. The industrial effluent currently going to about half of the 27 outfalls under consideration would be rerouted to LANL`s sanitary sewer system. Industrial effluent from other outfalls would be eliminated by replacing once-through cooling water systems with recirculation systems, or, in a few instances, operational changes would result in no generation of industrial effluent.more » After the industrial effluents have been discontinued, the affected outfalls would be removed from the NPDES Permit. The pipes from the source building or structure to the discharge point for the outfalls may be plugged, or excavated and removed. Other outfalls would remain intact and would continue to discharge stormwater. The No Action alternative, which would maintain the status quo for LANL`s outfalls, was also analyzed. An alternative in which industrial effluent would be treated at the source facilities was considered but dismissed from further analysis because it would not reasonably meet the DOE`s purpose for action, and its potential environmental effects were bounded by the analysis of the Proposed Action and the No Action alternatives.« less
Mouse-tracking evidence for parallel anticipatory option evaluation.
Cranford, Edward A; Moss, Jarrod
2017-12-23
In fast-paced, dynamic tasks, the ability to anticipate the future outcome of a sequence of events is crucial to quickly selecting an appropriate course of action among multiple alternative options. There are two classes of theories that describe how anticipation occurs. Serial theories assume options are generated and evaluated one at a time, in order of quality, whereas parallel theories assume simultaneous generation and evaluation. The present research examined the option evaluation process during a task designed to be analogous to prior anticipation tasks, but within the domain of narrative text comprehension. Prior research has relied on indirect, off-line measurement of the option evaluation process during anticipation tasks. Because the movement of the hand can provide a window into underlying cognitive processes, online metrics such as continuous mouse tracking provide more fine-grained measurements of cognitive processing as it occurs in real time. In this study, participants listened to three-sentence stories and predicted the protagonists' final action by moving a mouse toward one of three possible options. Each story was presented with either one (control condition) or two (distractor condition) plausible ending options. Results seem most consistent with a parallel option evaluation process because initial mouse trajectories deviated further from the best option in the distractor condition compared to the control condition. It is difficult to completely rule out all possible serial processing accounts, although the results do place constraints on the time frame in which a serial processing explanation must operate.
Engineering assessment of inactive uranium mill tailings, Durango Site, Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-06-01
Ford, Bacon and Davis Utah Inc. has reevaluated the Durango site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the nearly 1.6 million tons of tailings at the Durango sitemore » constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the seven options range from about $10,700,000 for stabilization in-place, to about $21,800,000 for disposal at a distance of about 10 mi. Three principal alternatives for the reprocessing of the Durango tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $30/lb U/sub 3/O/sub 8/ by either heap leach or conventional plant processes.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... disturbances such as high-severity wildfire, climate change, or insects. Proposed actions include improving... considered. The no-action alternative represents no change and serves as the baseline for the comparison...
Freedom, choice, and the sense of agency
Barlas, Zeynep; Obhi, Sukhvinder S.
2013-01-01
The sense of agency is an intriguing aspect of human consciousness and is commonly defined as the sense that one is the author of their own actions and their consequences. In the current study, we varied the number of action alternatives (one, three, seven) that participants could select from and determined the effects on intentional binding which is believed to index the low-level sense of agency. Participants made self-paced button presses while viewing a conventional Libet clock and reported the perceived onset time of either the button presses or consequent auditory tones. We found that the binding effect was strongest when participants had the maximum number of alternatives, intermediate when they had medium level of action choice and lowest when they had no choice. We interpret our results in relation to the potential link between agency and the freedom to choose one’s actions. PMID:24009575
76 FR 410 - Notice of Final Federal Agency Actions on Proposed Highway in Alaska
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
... Number ACSTP-0001(277)/56047; Project Location: The KAC Project (Northern Access-Erickson Alternative... downtown Anchorage will go under Government Hill using the Erickson Street alternative with a cut and cover...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of themore » nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.« less
Networks and games for precision medicine.
Biane, Célia; Delaplace, Franck; Klaudel, Hanna
2016-12-01
Recent advances in omics technologies provide the leverage for the emergence of precision medicine that aims at personalizing therapy to patient. In this undertaking, computational methods play a central role for assisting physicians in their clinical decision-making by combining data analysis and systems biology modelling. Complex diseases such as cancer or diabetes arise from the intricate interplay of various biological molecules. Therefore, assessing drug efficiency requires to study the effects of elementary perturbations caused by diseases on relevant biological networks. In this paper, we propose a computational framework called Network-Action Game applied to best drug selection problem combining Game Theory and discrete models of dynamics (Boolean networks). Decision-making is modelled using Game Theory that defines the process of drug selection among alternative possibilities, while Boolean networks are used to model the effects of the interplay between disease and drugs actions on the patient's molecular system. The actions/strategies of disease and drugs are focused on arc alterations of the interactome. The efficiency of this framework has been evaluated for drug prediction on a model of breast cancer signalling. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Antimicrobial peptides interact with peptidoglycan
NASA Astrophysics Data System (ADS)
Neelay, Om P.; Peterson, Christian A.; Snavely, Mary E.; Brown, Taylor C.; TecleMariam, Ariam F.; Campbell, Jennifer A.; Blake, Allison M.; Schneider, Sydney C.; Cremeens, Matthew E.
2017-10-01
Traditional therapeutics are losing effectiveness as bacterial resistance increases, and antimicrobial peptides (AMPs) can serve as an alternative source for antimicrobial agents. Their mode of action is commonly hypothesized to involve pore formation in the lipid membrane, thereby leading to cell death. However, bacterial cell walls are much more complex than just the lipid membrane. A large portion of the wall is comprised of peptidoglycan, yet we did not find any report of AMP-peptidoglycan interactions. Consequently, this work evaluated AMP-peptidoglycan and AMP-phospholipid (multilamellar vesicles) interactions through tryptophan fluorescence. Given that peptidoglycan is insoluble and vesicles are large particles, we took advantage of the unique properties of Trp-fluorescence to use one technique for two very different systems. Interestingly, melittin and cecropin A interacted with peptidoglycan to a degree similar to vancomycin, a positive control. Whether these AMP-peptidoglycan interactions relate to a killing mode of action requires further study.
Remedial action suitability for the Cornhusker Army Ammunition Plant site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nonavinakere, S.; Rappa, P. III
1995-12-31
Numerous Department of Defense (DOD) sites across the nation are contaminated with explosive wastes due to munitions production during World War II, Korean Conflict and Vietnam Conflict. Production activities included explosives manufacturing, loading, packing, assembling, machining, casting and curing. Contaminants often present at these sites include TNT, RDX, HMX, Tetryl 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-TNB and nitrobenzene. The Cornhusker Army Ammunition Plant (CAAP) is one such DOD site that has been determined to be contaminated with explosives. The CAAP is located approximately 2 miles west of the City of Grand Island in Hall County, Nebraska. The plant produced artillery, bombs, boosters,more » supplementary charges and various other experimental explosives. The purpose of this paper is to provide an overview of the site background, review of the remedial alternatives evaluation process and rationale behind the selection of present remedial action.« less
Using decision analysis to support proactive management of emerging infectious wildlife diseases
Grant, Evan H. Campbell; Muths, Erin L.; Katz, Rachel A.; Canessa, Stefano; Adams, Michael J.; Ballard, Jennifer R.; Berger, Lee; Briggs, Cheryl J.; Coleman, Jeremy; Gray, Matthew J.; Harris, M. Camille; Harris, Reid N.; Hossack, Blake R.; Huyvaert, Kathryn P.; Kolby, Jonathan E.; Lips, Karen R.; Lovich, Robert E.; McCallum, Hamish I.; Mendelson, Joseph R.; Nanjappa, Priya; Olson, Deanna H.; Powers, Jenny G.; Richgels, Katherine L. D.; Russell, Robin E.; Schmidt, Benedikt R.; Spitzen-van der Sluijs, Annemarieke; Watry, Mary Kay; Woodhams, Douglas C.; White, C. LeAnn
2017-01-01
Despite calls for improved responses to emerging infectious diseases in wildlife, management is seldom considered until a disease has been detected in affected populations. Reactive approaches may limit the potential for control and increase total response costs. An alternative, proactive management framework can identify immediate actions that reduce future impacts even before a disease is detected, and plan subsequent actions that are conditional on disease emergence. We identify four main obstacles to developing proactive management strategies for the newly discovered salamander pathogen Batrachochytrium salamandrivorans (Bsal). Given that uncertainty is a hallmark of wildlife disease management and that associated decisions are often complicated by multiple competing objectives, we advocate using decision analysis to create and evaluate trade-offs between proactive (pre-emergence) and reactive (post-emergence) management options. Policy makers and natural resource agency personnel can apply principles from decision analysis to improve strategies for countering emerging infectious diseases.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis a introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The objectives of the Human Health Exposure Assessment include: (1) estimate the type and magnitude of exposures to contaminants; (2) Identify contaminants of concern; (3) Identify sites for remedial action; (4) Recommend sites for the no action remedial alternative; and (5) Provide a basis for detailed characterization of the risk associated with all sites. This document consists of the following: An executive summary. Vol I - Land use and exposed population evaluations. Vol. II III - Toxicity assessment (includes army and shell toxicity profiles). Vol. IV - PPLV Methodology. Vol. V - PPLV Calculations. Vol. VI - Study area exposuremore » analysis A introduction, B Western study ares, C Southern study area, D northern Central study area, E Central study area, F Eastern study area, G South plants study area, and H North plants study area. Vol. VII - Summary exposure assessment.« less
Photodynamic action of protoporphyrin IX derivatives on Trichophyton rubrum*
Ramos, Rogério Rodrigo; Kozusny-Andreani, Dora Inês; Fernandes, Adjaci Uchôa; Baptista, Mauricio da Silva
2016-01-01
BACKGROUND Dermatophytes are filamentous keratinophilic fungi. Trichophyton rubrum is a prevalent infectious agent in tineas and other skin diseases. Drug therapy is considered to be limited in the treatment of such infections, mainly due to low accessibility of the drug to the tissue attacked and development of antifungal resistance in these microorganisms. In this context, Photodynamic Therapy is presented as an alternative. OBJECTIVE Evaluate, in vitro, the photodynamic activity of four derivatives of Protoporphyrin IX by irradiation with LED 400 nm in T. rubrum. METHOD Assays were subjected to irradiation by twelve cycles of ten minutes at five minute intervals. RESULT Photodynamic action appeared as effective with total elimination of UFCs from the second irradiation cycle. CONCLUSION Studies show that the photodynamic activity on Trichophyton rubrum relates to a suitable embodiment of the photosensitizer, which can be maximized by functionalization of peripheral groups of the porphyrinic ring. PMID:27192510
ERIC Educational Resources Information Center
Champoux, Joseph E.
2005-01-01
Live-action and animated film remake scenes can show many topics typically taught in organizational behaviour and management courses. This article discusses, analyses and compares such scenes to identify parallel film scenes useful for teaching. The analysis assesses the scenes to decide which scene type, animated or live-action, more effectively…
Inoue, Kanako; Tsurumi, Tomohiro; Ishii, Hideo; Park, Pyoyun; Ikeda, Kenichi
2012-01-01
Azoxystrobin (AZ), a strobilurin-derived fungicide, is known to inhibit mitochondrial respiration in fungi by blocking the electron transport chain in the inner mitochondrial membrane. Germination was strongly inhibited when Botrytis cinerea spore suspension was treated with AZ and the alternative oxidase (AOX) inhibitors, salicylhydroxamic acid (SHAM) and n-propyl gallate. However, chemical death indicators trypan blue and propidium iodide showed that those spores were still alive. When the spore suspension in the AZ and SHAM solution was replaced with distilled water, the germination rate almost recovered, at least during the first 2 days of incubation with AZ and SHAM solution. No morphological alteration was detected in the cells treated with AZ and SHAM, especially in mitochondria, using transmission electron microscopy. Therefore, simultaneous application of AZ and AOX inhibitors has a fungistatic, rather than a fungicidal, action. © 2011 Federation of European Microbiological Societies. Published by Blackwell Publishing Ltd. All rights reserved.
76 FR 33994 - Alternative Simplified Credit Under Section 41(c)(5)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... Alternative Simplified Credit Under Section 41(c)(5) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... regulations relating to the election and calculation of the alternative simplified credit under section 41(c... 41(c)(5). The ASC was added by the Tax Relief and Health Care Act of 2006 (Public Law 109-432, 120...
MEG adaptation reveals action representations in posterior occipitotemporal regions.
Hauswald, Anne; Tucciarelli, Raffaele; Lingnau, Angelika
2018-06-01
When we observe other people's actions, a number of parietal and precentral regions known to be involved in the planning and execution of actions are recruited for example seen as power decreases in alpha and beta frequencies indicative of increased activation. It has been argued that this recruitment reflects the process of simulating the observed action, thereby providing access to the meaning of the action. Alternatively, it has been suggested that rather than providing access to the meaning of an action, parietal and precentral regions might be recruited as a consequence of action understanding. A way to distinguish between these alternatives is to examine where in the brain and at which time point it is possible to discriminate between different types of actions (e.g., pointing or grasping) irrespective of the way these are performed. To this aim, we presented participants with videos of simple hand actions performed with the left or right hand towards a target on the left or the right side while recording magnetoencephalography (MEG) data. In each trial, participants were presented with two subsequent videos (S1, S2) depicting either the same (repeat trials) or different (non-repeat trials) actions. We predicted that areas that are sensitive to the type of action should show stronger adaptation (i.e., a smaller decrease in alpha and beta power) in repeat in comparison to non-repeat trials. Indeed, we observed less alpha and beta power decreases during the presentation of S2 when the action was repeated compared to when two different actions were presented indicating adaptation of neuronal populations that are selective for the type of action. Sources were obtained exclusively in posterior occipitotemporal regions, supporting the notion that an early differentiation of actions occurs outside the motor system. Copyright © 2018 Elsevier Ltd. All rights reserved.
44 CFR 9.13 - Particular types of temporary housing.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-rise areas. (5) FEMA shall comply with Step 2 Early Public Notice (§ 9.8(c)) and Step 7 Final Public... to flooding, a rejection of a non-floodplain location alternative and of the no-action alternative...
2010-01-01
Background Intermittent preventive treatment of malaria with sulphadoxine-pyrimethamine (SP) is recommended for the prevention of malaria in pregnancy in sub-Saharan Africa. Increasing drug resistance necessitates the urgent evaluation of alternative drugs. Currently, the most promising candidates in clinical development are mefloquine and azithromycin. Besides the anti-malarial activity, SP is also a potent antibiotic and incurs significant anti-microbial activity when given as IPTp - though systematic clinical evaluation of this action is still lacking. Methods In this study, the intrinsic anti-bacterial activity of mefloquine and azithromycin was assessed in comparison to sulphadoxine-pyrimethamine against bacterial pathogens with clinical importance in pregnancy in a standard microdilution assay. Results SP was highly active against Staphylococcus aureus and Streptococcus pneumoniae. All tested Gram-positive bacteria, except Enterococcus faecalis, were sensitive to azithromycin. Additionally, azithromycin was active against Neisseria gonorrhoeae. Mefloquine showed good activity against pneumococci but lower in vitro action against all other tested pathogens. Conclusion These data indicate important differences in the spectrum of anti-bacterial activity for the evaluated anti-malarial drugs. Given the large scale use of IPTp in Africa, the need for prospective clinical trials evaluating the impact of antibiotic activity of anti-malarials on maternal and foetal health and on the risk of promoting specific drug resistance of bacterial pathogens is discussed. PMID:21029476
Maxwell, Sean L.; Rhodes, Jonathan R.; Runge, Michael C.; Possingham, Hugh P.; Ng, Chooi Fei; McDonald Madden, Eve
2015-01-01
Conservation decision-makers face a trade-off between spending limited funds on direct management action, or gaining new information in an attempt to improve management performance in the future. Value-of-information analysis can help to resolve this trade-off by evaluating how much management performance could improve if new information was gained. Value-of-information analysis has been used extensively in other disciplines, but there are only a few examples where it has informed conservation planning, none of which have used it to evaluate the financial value of gaining new information. We address this gap by applying value-of-information analysis to the management of a declining koala Phascolarctos cinereuspopulation. Decision-makers responsible for managing this population face uncertainty about survival and fecundity rates, and how habitat cover affects mortality threats. The value of gaining new information about these uncertainties was calculated using a deterministic matrix model of the koala population to find the expected population growth rate if koala mortality threats were optimally managed under alternative model hypotheses, which represented the uncertainties faced by koala managers. Gaining new information about survival and fecundity rates and the effect of habitat cover on mortality threats will do little to improve koala management. Across a range of management budgets, no more than 1·7% of the budget should be spent on resolving these uncertainties. The value of information was low because optimal management decisions were not sensitive to the uncertainties we considered. Decisions were instead driven by a substantial difference in the cost efficiency of management actions. The value of information was up to forty times higher when the cost efficiencies of different koala management actions were similar. Synthesis and applications. This study evaluates the ecological and financial benefits of gaining new information to inform a conservation problem. We also theoretically demonstrate that the value of reducing uncertainty is highest when it is not clear which management action is the most cost efficient. This study will help expand the use of value-of-information analyses in conservation by providing a cost efficiency metric by which to evaluate research or monitoring.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-30
...,'' click ``Search,'' and then click on the balloon shape in the ``Actions'' column. If you submit your... accordingly as there is an alternate route. The vertical clearance of the bridge is 40 feet above mean high...
Testing In College Admissions: An Alternative to the Traditional Predictive Model.
ERIC Educational Resources Information Center
Lunneborg, Clifford E.
1982-01-01
A decision-making or utility theory model (which deals effectively with affirmative action goals and allows standardized tests to be placed in the service of those goals) is discussed as an alternative to traditional predictive admissions. (Author/PN)
Bayesian networks for evaluation of evidence from forensic entomology.
Andersson, M Gunnar; Sundström, Anders; Lindström, Anders
2013-09-01
In the aftermath of a CBRN incident, there is an urgent need to reconstruct events in order to bring the perpetrators to court and to take preventive actions for the future. The challenge is to discriminate, based on available information, between alternative scenarios. Forensic interpretation is used to evaluate to what extent results from the forensic investigation favor the prosecutors' or the defendants' arguments, using the framework of Bayesian hypothesis testing. Recently, several new scientific disciplines have been used in a forensic context. In the AniBioThreat project, the framework was applied to veterinary forensic pathology, tracing of pathogenic microorganisms, and forensic entomology. Forensic entomology is an important tool for estimating the postmortem interval in, for example, homicide investigations as a complement to more traditional methods. In this article we demonstrate the applicability of the Bayesian framework for evaluating entomological evidence in a forensic investigation through the analysis of a hypothetical scenario involving suspect movement of carcasses from a clandestine laboratory. Probabilities of different findings under the alternative hypotheses were estimated using a combination of statistical analysis of data, expert knowledge, and simulation, and entomological findings are used to update the beliefs about the prosecutors' and defendants' hypotheses and to calculate the value of evidence. The Bayesian framework proved useful for evaluating complex hypotheses using findings from several insect species, accounting for uncertainty about development rate, temperature, and precolonization. The applicability of the forensic statistic approach to evaluating forensic results from a CBRN incident is discussed.
Looking in the mirror: Teachers' use of autobiography and action research to improve practice
NASA Astrophysics Data System (ADS)
Davis, Nancy T.
1996-03-01
This study presents an argument for valuing subjective, reflective knowledge based on Habermas' category of cognitive interest of emancipatory knowing. Using the teachers' autobiographies and action research as data sources, the process of personal empowerment is explored. A model of change derived from analysis of teachers' writings is proposed that includes disturbance, alternatives, confidence and action.
Alternative Fuels Data Center: Texas Puts a New Spin on Mowing
halt on Ozone Action Days, and petroleum use is reduced by about 100,000 gallons per year. " On -level ozone pollution, prompting the state to declare Ozone Action Days. On these days, residents and produce much lower emissions than gasoline mowers do, and they can be used on Ozone Action Days. CTCC
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
... of Decision for the Final Environmental Impact Statement for the General Management Plan (FEIS/GMP... Alternative contained in the FEIS/GMP issued on September 19, 2008. The following course of action will occur... events. This alternative has been modified from the Alternative B presented in the FEIS/GMP as discussed...
Gadde, U; Kim, W H; Oh, S T; Lillehoj, Hyun S
2017-06-01
With the increase in regulations regarding the use of antibiotic growth promoters and the rise in consumer demand for poultry products from 'Raised Without Antibiotics' or 'No Antibiotics Ever' flocks, the quest for alternative products or approaches has intensified in recent years. A great deal of research has focused on the development of antibiotic alternatives to maintain or improve poultry health and performance. This review describes the potential for the various alternatives available to increase animal productivity and help poultry perform to their genetic potential under existing commercial conditions. The classes of alternatives described include probiotics, prebiotics, synbiotics, organic acids, enzymes, phytogenics, antimicrobial peptides, hyperimmune egg antibodies, bacteriophages, clay, and metals. A brief description of the mechanism of action, efficacy, and advantages and disadvantages of their uses are also presented. Though the beneficial effects of many of the alternatives developed have been well demonstrated, the general consensus is that these products lack consistency and the results vary greatly from farm to farm. Furthermore, their mode of action needs to be better defined. Optimal combinations of various alternatives coupled with good management and husbandry practices will be the key to maximize performance and maintain animal productivity, while we move forward with the ultimate goal of reducing antibiotic use in the animal industry.
Fraga, Carolina Miguel; Da Costa, Tatiane Luiza; De Castro, Ana Maria; Reynoso-Ducoing, Olivia; Ambrosio, Javier; Hernández-Campos, Alicia; Castillo, Rafael; Vinaud, Marina Clare
2016-04-01
Biochemical studies of benzimidazole derivatives are important to determine their mode of action and activity against parasites. The lack of antihelminthic alternatives to treat parasitic infections and albendazole resistance cases make the search for new antiparasitary drugs of utmost importance. The 6-chloro-5-(1-naphthyloxy)-2-(trifluoromethyl)-1H-benzimidazole (RCB20) is a benzimidazole derivative with promising effect. This study evaluated the effect of different concentrations of RCB20 in the alternative energetic pathway of in vitro Taenia crassiceps cysticerci. The parasites were in vitro exposed to 6.5 and 13 µM of RCB20 and albendazole sulfoxide (ABZSO). The quantification of acetate, acetoacetate, β-hydroxybutyrate, fumarate and propionate was performed by high-performance liquid chromatography. The quantification of urea, creatinine and total proteins was performed by spectrophotometry. The increase in β-hydroxybutyrate reflects the enhancement of the fatty acid oxidation in the treated groups. Volatile fatty acids secretion, acetate and propionate, was increased in the treated groups. The secretion mechanisms of the treated parasites were impaired due to organic acids increased concentrations in the cysticerci. It is possible to conclude that the metabolic effect on alternative energetic pathways is slightly increased in the parasites treated with RCB20 than the ones treated with ABZSO.
The Effect of Rapacuronium or Succinylcholine on the Duration of Action of Rocuronium
2001-10-01
23/Oct/2001 THESIS 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER THE EFFECT OF RAPACURONIUM OR SUCCINYLCHOLINE ON THE DURATION OF ACTION OF ROCURONIUM 5b... Rocuronium , an intermediate acting non-depolarizer, provides an alternative for intubation when succinylcholine is not recommended. Rapacuronium...approved in 1999, has a shorter onset and duration of action than rocuronium . The goal of this study was to determine whether the duration of action of
Evacuation Criteria after A Nuclear Accident: A Personal Perspective
Wilson, Richard
2012-01-01
In any decision involving radiation a risk-risk or risk-benefit comparison should be done. This can be either explicit or implicit. When the adverse effect of an alternate action is less than the planned action, such as medical use of X rays or nuclear power in ordinary operation, the comparison is simple. But in this paper I argue that with the situation faced by the Japanese in Fukushima, the assumption that the risk of an alternate action is small is false. The risks of unnecessary evacuation exceeded the risk of radiation cancers hypothetically produced by staying in place. This was not realized by those that had to make a decision within hours. This realization suggests important changes, worldwide, in the guidelines for radiation protection in accident situations. PMID:23304100
Core concepts of spatial prioritisation in systematic conservation planning.
Kukkala, Aija S; Moilanen, Atte
2013-05-01
Systematic conservation planning (SCP) is a field of conservation biology concerned with delivering on-the-ground actions that achieve conservation goals. It describes a set of operational models that cover both design and implementation of conservation, with a strong focus on mobilising the collective action typically required to implement conservation. SCP, as it was originally described, was composed of six different stages: collection of data, identification of conservation goals, evaluation of the existing protected area network, design of expansions, implementation of conservation action, and long-term maintenance of biodiversity in the network. Since then, the operational model has been expanded into several different variants. Conservation actions applied inside SCP include establishment and expansion of reserve networks and allocation of habitat restoration and management. Within the broader context of SCP, there is a fundamental biogeographic-economic analysis frequently called spatial conservation prioritisation or conservation assessment, which is used for identifying where important areas for biodiversity are and how conservation goals might be achieved efficiently. Here, we review the usage and meaning of the 12 biogeographic-economic core concepts of SCP: adequacy, complementarity, comprehensiveness, effectiveness, efficiency, flexibility, irreplaceability, replacement cost, representation, representativeness, threat, and vulnerability. Some of the concepts have clear definitions whereas others may have alternative and possibly conflicting definitions. With a comprehensive literature review literature, we elucidate the historical backgrounds of these concepts, the first definitions and usages, alternative later definitions, key applications, and prior reviews. This review reduces linguistic uncertainty in the application of SCP. Since SCP is a global activity with a multitude of different stakeholders involved, it is vital that those involved can speak the same language. Through these concepts, this review serves as a source of information about the historical development of SCP. It provides a comprehensive review for anyone wishing to understand the key concepts of spatial prioritisation within SCP. © 2012 The Authors. Biological Reviews © 2012 Cambridge Philosophical Society.
Core concepts of spatial prioritisation in systematic conservation planning
Kukkala, Aija S; Moilanen, Atte
2013-01-01
Systematic conservation planning (SCP) is a field of conservation biology concerned with delivering on-the-ground actions that achieve conservation goals. It describes a set of operational models that cover both design and implementation of conservation, with a strong focus on mobilising the collective action typically required to implement conservation. SCP, as it was originally described, was composed of six different stages: collection of data, identification of conservation goals, evaluation of the existing protected area network, design of expansions, implementation of conservation action, and long-term maintenance of biodiversity in the network. Since then, the operational model has been expanded into several different variants. Conservation actions applied inside SCP include establishment and expansion of reserve networks and allocation of habitat restoration and management. Within the broader context of SCP, there is a fundamental biogeographic-economic analysis frequently called spatial conservation prioritisation or conservation assessment, which is used for identifying where important areas for biodiversity are and how conservation goals might be achieved efficiently. Here, we review the usage and meaning of the 12 biogeographic-economic core concepts of SCP: adequacy, complementarity, comprehensiveness, effectiveness, efficiency, flexibility, irreplaceability, replacement cost, representation, representativeness, threat, and vulnerability. Some of the concepts have clear definitions whereas others may have alternative and possibly conflicting definitions. With a comprehensive literature review literature, we elucidate the historical backgrounds of these concepts, the first definitions and usages, alternative later definitions, key applications, and prior reviews. This review reduces linguistic uncertainty in the application of SCP. Since SCP is a global activity with a multitude of different stakeholders involved, it is vital that those involved can speak the same language. Through these concepts, this review serves as a source of information about the historical development of SCP. It provides a comprehensive review for anyone wishing to understand the key concepts of spatial prioritisation within SCP. PMID:23279291
Tribal Energy Program for California Indian Tribes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Singer, S.
A strategic plan is needed to catalyze clean energy in the more than 100 California Indian tribal communities with varying needs and energy resources. We propose to conduct a scoping study to identify tribal lands with clean energy potential, as well as communities with lack of grid-tied energy and communications access. The research focus would evaluate the energy mixture and alternatives available to these tribal communities, and evaluate greenhouse gas emissions associated with accessing fossil fuel used for heat and power. Understanding the baseline of energy consumption and emissions of communities is needed to evaluate improvements and advances from technology.more » Based on this study, we will develop a strategic plan that assesses solutions to address high energy fuel costs due to lack of electricity access and inform actions to improve economic opportunities for tribes. This could include technical support for tribes to access clean energy technologies and supporting collaboration for on-site demonstrations.« less
Alternative Action Organizations: Social Solidarity or Political Advocacy?
Grasso, Maria
2018-01-01
This article investigates the involvement of alternative action organizations in three forms of political advocacy in an attempt to gauge their degree of politicization. These forms can be understood as representing three different ways of making political claims: by raising public awareness with respect to a given cause or issue, by trying to influence the policy maker through “insider” lobbying activities, and by protesting in the streets as “outsiders.” Our findings show strong cross-national variations in all three forms of political activities, although not always following a consistent pattern. They also suggest that there is a relationship between the severity of the economic crisis and the form of advocacy. Most important, our analysis suggests that the politicization of alternative action organizations depends both on certain internal characteristics such as their degree of formalization and professionalization, as well as their thematic focus, and the scope of their activities, and on the broader context in terms of economic crisis, austerity policies, and political opportunities. As regards the latter, we find an impact especially on lobbying and protesting. PMID:29899575
Alternative Policy Instruments. CPRE Joint Note Series.
ERIC Educational Resources Information Center
McDonnell, Lorraine M.; Elmore, Richard F.
This publication builds a conceptual framework that categorizes alternative policy instruments for educational reform into actions. It defines four categories of policy instruments and hypothesizes how each will operate in addressing different policy problems in different political and organizational contexts. Subsequent research will assess…
THE ALTERNATIVE COVERS ASSESSMENT PROGRAM (ACAP)
Alternative covers attempt to achieve equivalent performance to conventional impermeable covers through an action that has been described as 'sponge and pump'. In this type of cover system, the soil and plants absorb moisture from precipitation, store it in the plant and soil str...
NASA Astrophysics Data System (ADS)
Erwin, S. O.; Jacobson, R. B.; Fischenich, C. J.; Bulliner, E. A., IV; McDonald, R.; DeLonay, A. J.; Braaten, P.; Elliott, C. M.; Chojnacki, K.
2017-12-01
Management of the Missouri River—the longest river in the USA, with a drainage basin covering one sixth of the conterminous USA—is increasingly driven by the need to understand biophysical processes governing the dispersal of 8-mm long larval pallid sturgeon. In both the upper and lower basin, survival of larval sturgeon is thought to be a bottleneck limiting populations, but because of different physical processes at play, different modeling frameworks and resolutions are required to link management actions with population-level responses. In the upper basin, a series of impoundments reduce the length of river for the drifting larval sturgeon to complete their development. Downstream from the mainstem dams, recruitment is most likely diminished by channelization and reduced floodplain connectivity that limit the benthic habitat available for larval sturgeon to settle and initiate feeding. We present a synthesis of complementary field studies, laboratory observations, and numerical simulations that evaluate the physical processes related to larval dispersal of sturgeon in the Missouri River basin. In the upper basin, we use one-dimensional advection-dispersion models, calibrated with field experiments conducted in 2016-2017 using surrogate particles and tracers, to evaluate reservoir management alternatives. Results of field experimentation and numerical modeling show that proposed management alternatives in the upper basin may be limited by insufficient lengths of flowing river for drifting larvae to fully develop into their juvenile lifestage. In the intensively engineered lower basin, we employ higher resolution measurements and models to evaluate potential for channel reconfiguration and flow alteration to promote successful interception of drifting larvae into supportive benthic habitats for the initiation of feeding and transition to the juvenile life stage. We illustrate how refined understanding of small-scale biophysical process has been incorporated into the basin-scale management framework, thereby prompting a shift in restoration actions and design.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impactmore » Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.« less
NASA Astrophysics Data System (ADS)
Genina, Elina A.; Titorenko, Vladimir A.; Belikov, Andrey V.; Bashkatov, Alexey N.; Tuchin, Valery V.
2015-12-01
The efficacy of blue light-emitting toothbrushes (B-LETBs) (405 to 420 nm, power density 2 mW/cm2) for reduction of dental plaques and gingival inflammation has been evaluated. Microbiological study has shown the multifactor therapeutic action of the B-LETBs on oral pathological microflora: in addition to partial mechanical removal of bacteria, photodynamic action suppresses them up to 97.5%. In the pilot clinical studies, subjects with mild to moderate gingivitis have been randomly divided into two groups: a treatment group that used the B-LETBs and a control group that used standard toothbrushes. Indices of plaque, gingival bleeding, and inflammation have been evaluated. A significant improvement of all dental indices in comparison with the baseline (by 59%, 66%, and 82% for plaque, gingival bleeding, and inflammation, respectively) has been found. The treatment group has demonstrated up to 50% improvement relative to the control group. We have proposed the B-LETBs to serve for prevention of gingivitis or as an alternative to conventional antibiotic treatment of this disease due to their effectiveness and the absence of drug side effects and bacterial resistance.
Genina, Elina A; Titorenko, Vladimir A; Belikov, Andrey V; Bashkatov, Alexey N; Tuchin, Valery V
2015-01-01
The efficacy of blue light-emitting toothbrushes (B-LETBs) (405 to 420 nm, power density 2 mW/cm(2)) for reduction of dental plaques and gingival inflammation has been evaluated. Microbiological study has shown the multifactor therapeutic action of the B-LETBs on oral pathological microflora: in addition to partial mechanical removal of bacteria, photodynamic action suppresses them up to 97.5%. In the pilot clinical studies, subjects with mild to moderate gingivitis have been randomly divided into two groups: a treatment group that used the B-LETBs and a control group that used standard toothbrushes. Indices of plaque, gingival bleeding, and inflammation have been evaluated. A significant improvement of all dental indices in comparison with the baseline (by 59%, 66%, and 82% for plaque, gingival bleeding, and inflammation, respectively) has been found. The treatment group has demonstrated up to 50% improvement relative to the control group. We have proposed the B-LETBs to serve for prevention of gingivitis or as an alternative to conventional antibiotic treatment of this disease due to their effectiveness and the absence of drug side effects and bacterial resistance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.
[Oxidative stress. Should it be measured in the diabetic patient?].
Villa-Caballero, L; Nava-Ocampo, A A; Frati-Munari, A C; Ponce-Monter, H
2000-01-01
Oxidative stress has been defined as a loss of counterbalance between free radical or reactive oxygen species production and the antioxidant systems, with negative effects on carbohydrates, lipids, and proteins. It is also involved in the progression of different chronic diseases and apoptosis. Diabetes mellitus is associated to a high oxidative stress level through different biochemical pathways, i.e. protein glycosylation, glucose auto-oxidation, and the polyol pathway, mainly induced by hyperglycemia. Oxidative stress could also be involved in the pathogenesis of atherosclerotic lesions and other chronic diabetic complications. Measurement of oxidative stress could be useful to investigate its role in the initiation and development processes of chronic diabetic complications and also to evaluate preventive actions, including antioxidative therapy. Different attempts have been made to obtain a practical, accurate, specific, and sensitive method to evaluate oxidative stress in clinical practice. However, this ideal method is not currently available to date and the usefulness of the current methods needs to be confirmed in daily practice. We suggest quantifying oxidated and reduced glutation (GSSG/GSH) and the thiobarbituric reactive substances (TBARS) with currently alternatives. Currently available alternative methods while we await better options.
38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a...-evaluation. (1) A recipient shall, within one year of the effective date of this part: (i) Evaluate with the...
77 FR 71031 - Office of Hazardous Materials Safety; Actions on Special Permit Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-28
...), transportation in commerce 173.465(d). of certain Radioactive material in alternative packaging by highway. A... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Office of Hazardous Materials Safety; Actions on Special Permit Applications AGENCY: Pipeline And Hazardous Materials...
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... technical analyses are balanced with environmental analysis, the agency preferred alternative will not...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives based on relevant factors including environmental, economic, and technical considerations and...
Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1981-09-01
Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell sitemore » constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present.« less
Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado. Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1981-09-01
Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell sitemore » constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present.« less
Comparing models of Red Knot population dynamics
McGowan, Conor P.
2015-01-01
Predictive population modeling contributes to our basic scientific understanding of population dynamics, but can also inform management decisions by evaluating alternative actions in virtual environments. Quantitative models mathematically reflect scientific hypotheses about how a system functions. In Delaware Bay, mid-Atlantic Coast, USA, to more effectively manage horseshoe crab (Limulus polyphemus) harvests and protect Red Knot (Calidris canutus rufa) populations, models are used to compare harvest actions and predict the impacts on crab and knot populations. Management has been chiefly driven by the core hypothesis that horseshoe crab egg abundance governs the survival and reproduction of migrating Red Knots that stopover in the Bay during spring migration. However, recently, hypotheses proposing that knot dynamics are governed by cyclical lemming dynamics garnered some support in data analyses. In this paper, I present alternative models of Red Knot population dynamics to reflect alternative hypotheses. Using 2 models with different lemming population cycle lengths and 2 models with different horseshoe crab effects, I project the knot population into the future under environmental stochasticity and parametric uncertainty with each model. I then compare each model's predictions to 10 yr of population monitoring from Delaware Bay. Using Bayes' theorem and model weight updating, models can accrue weight or support for one or another hypothesis of population dynamics. With 4 models of Red Knot population dynamics and only 10 yr of data, no hypothesis clearly predicted population count data better than another. The collapsed lemming cycle model performed best, accruing ~35% of the model weight, followed closely by the horseshoe crab egg abundance model, which accrued ~30% of the weight. The models that predicted no decline or stable populations (i.e. the 4-yr lemming cycle model and the weak horseshoe crab effect model) were the most weakly supported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1991-04-01
This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less
Alternative treatment technology information center computer database system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, D.
1995-10-01
The Alternative Treatment Technology Information Center (ATTIC) computer database system was developed pursuant to the 1986 Superfund law amendments. It provides up-to-date information on innovative treatment technologies to clean up hazardous waste sites. ATTIC v2.0 provides access to several independent databases as well as a mechanism for retrieving full-text documents of key literature. It can be accessed with a personal computer and modem 24 hours a day, and there are no user fees. ATTIC provides {open_quotes}one-stop shopping{close_quotes} for information on alternative treatment options by accessing several databases: (1) treatment technology database; this contains abstracts from the literature on all typesmore » of treatment technologies, including biological, chemical, physical, and thermal methods. The best literature as viewed by experts is highlighted. (2) treatability study database; this provides performance information on technologies to remove contaminants from wastewaters and soils. It is derived from treatability studies. This database is available through ATTIC or separately as a disk that can be mailed to you. (3) underground storage tank database; this presents information on underground storage tank corrective actions, surface spills, emergency response, and remedial actions. (4) oil/chemical spill database; this provides abstracts on treatment and disposal of spilled oil and chemicals. In addition to these separate databases, ATTIC allows immediate access to other disk-based systems such as the Vendor Information System for Innovative Treatment Technologies (VISITT) and the Bioremediation in the Field Search System (BFSS). The user may download these programs to their own PC via a high-speed modem. Also via modem, users are able to download entire documents through the ATTIC system. Currently, about fifty publications are available, including Superfund Innovative Technology Evaluation (SITE) program documents.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16,more » Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) to the dose-based final action level (FAL). The presence of TED exceeding the FAL is considered a radiological contaminant of concern (COC). Anything identified as a COC will require corrective action. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters will be used to measure external radiological dose. Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plume, it was determined that the releases from the nuclear tests are co-located and will be investigated concurrently. A field investigation will be performed to define areas where TED exceeds the FAL and to determine whether other COCs are present at the site. The investigation will also collect information to determine the presence and nature of contamination associated with migration and excavation, as well as any potential releases discovered during the investigation. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less
Recognizing flu-like symptoms from videos.
Thi, Tuan Hue; Wang, Li; Ye, Ning; Zhang, Jian; Maurer-Stroh, Sebastian; Cheng, Li
2014-09-12
Vision-based surveillance and monitoring is a potential alternative for early detection of respiratory disease outbreaks in urban areas complementing molecular diagnostics and hospital and doctor visit-based alert systems. Visible actions representing typical flu-like symptoms include sneeze and cough that are associated with changing patterns of hand to head distances, among others. The technical difficulties lie in the high complexity and large variation of those actions as well as numerous similar background actions such as scratching head, cell phone use, eating, drinking and so on. In this paper, we make a first attempt at the challenging problem of recognizing flu-like symptoms from videos. Since there was no related dataset available, we created a new public health dataset for action recognition that includes two major flu-like symptom related actions (sneeze and cough) and a number of background actions. We also developed a suitable novel algorithm by introducing two types of Action Matching Kernels, where both types aim to integrate two aspects of local features, namely the space-time layout and the Bag-of-Words representations. In particular, we show that the Pyramid Match Kernel and Spatial Pyramid Matching are both special cases of our proposed kernels. Besides experimenting on standard testbed, the proposed algorithm is evaluated also on the new sneeze and cough set. Empirically, we observe that our approach achieves competitive performance compared to the state-of-the-arts, while recognition on the new public health dataset is shown to be a non-trivial task even with simple single person unobstructed view. Our sneeze and cough video dataset and newly developed action recognition algorithm is the first of its kind and aims to kick-start the field of action recognition of flu-like symptoms from videos. It will be challenging but necessary in future developments to consider more complex real-life scenario of detecting these actions simultaneously from multiple persons in possibly crowded environments.
Family Policy: Recommendations for State Action.
ERIC Educational Resources Information Center
Romig, Candace L., Ed.
This publication on family policy reviews federal and state policies and offers recommendations for state action. Initial discussion covers changes in the American family, demographics, and the economy. Issues of family maintenance considered include: family welfare policy and welfare reform; child abuse and neglect; alternatives to out-of-home…
Improving Theory Application among Pre-Service Teachers
ERIC Educational Resources Information Center
Jones, Anne
2009-01-01
This article describes the process of implementing Inter-collegially Supported Learning (Tigchelaar and Melief, 1997) and reflection using the ALACT [action, looking back, awareness of essential aspects, creating alternative methods of action, and trial] model (Korthhagen, 1985, 1988) an Elementary Masters in Teaching Program. This study takes a…
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (a) Ten members of the committee, or alternates acting for members, shall constitute a quorum. All actions of the committee shall require at least ten concurring votes: Provided, if the public member or... particular matter, ten concurring votes shall be required for an action of the committee. (b) The committee...
Groundwater Site Characterization: A Systems Perspective.
ERIC Educational Resources Information Center
Wolf, Frederick
1994-01-01
Groundwater remedial actions are highly complex projects. During the past 10 years, many remedial actions have begun, but very few have been successfully completed. This paper describes the complexity of groundwater remediation and offers an alternative management approach involving systems movement successfully utilized at a site in the…
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives, and state why the action may have unknown and/or significant environmental impacts. (3) The... delegations and committees, governors, national environmental organizations, the DOD and federal agency...
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives, and state why the action may have unknown and/or significant environmental impacts. (3) The... delegations and committees, governors, national environmental organizations, the DOD and federal agency...
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives, and state why the action may have unknown and/or significant environmental impacts. (3) The... delegations and committees, governors, national environmental organizations, the DOD and federal agency...
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives, and state why the action may have unknown and/or significant environmental impacts. (3) The... delegations and committees, governors, national environmental organizations, the DOD and federal agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... DEPARTMENT OF AGRICULTURE Natural Resources Conservation Service Non-Rock Alternatives to...: Natural Resources Conservation Service, Department of Agriculture. ACTION: Notice of Finding of No... of Agriculture, gives notice that an environmental impact statement is not being prepared for the Non...
78 FR 48593 - Refuge Alternatives for Underground Coal Mines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... conduct research and tests concerning the use of refuge chambers in underground coal mines, and to report... of Information MSHA will post all comments and information on the Internet without change, including... actions. NIOSH finalized its Research Report on Refuge Alternatives for Underground Coal Mines (NIOSH...
76 FR 24831 - Alternative to Minimum Days Off Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
... NUCLEAR REGULATORY COMMISSION 10 CFR Part 26 RIN 3150-AI94 [NRC-2011-0058] Alternative to Minimum Days Off Requirements AGENCY: Nuclear Regulatory Commission. ACTION: Proposed rule; correction. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is correcting a proposed rule that appeared in the...
Alternatives to School Disciplinary and Suspension Problems.
ERIC Educational Resources Information Center
South Carolina State Dept. of Education, Columbia. Div. of Instruction.
Policies and procedures for disciplining students should be designed to teach them responsibility, rather than simply punish them. Providing educational opportunities to behavioral deviants is a problem that does not have a simple solution. However, alternatives to suspension or expulsion must be attempted before these disciplinary actions are…
15 CFR 990.53 - Restoration selection-developing restoration alternatives.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., including a natural recovery alternative. (2) Natural recovery. Trustees must consider a natural recovery... comprised of actions to directly restore the natural resources and services to baseline on an accelerated... allow recovery or restoration of the injured natural resources (e.g., replacing substrate or vegetation...
15 CFR 990.53 - Restoration selection-developing restoration alternatives.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., including a natural recovery alternative. (2) Natural recovery. Trustees must consider a natural recovery... comprised of actions to directly restore the natural resources and services to baseline on an accelerated... allow recovery or restoration of the injured natural resources (e.g., replacing substrate or vegetation...
15 CFR 990.53 - Restoration selection-developing restoration alternatives.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., including a natural recovery alternative. (2) Natural recovery. Trustees must consider a natural recovery... comprised of actions to directly restore the natural resources and services to baseline on an accelerated... allow recovery or restoration of the injured natural resources (e.g., replacing substrate or vegetation...
[Delayed reactions of active avoidance in white rats under conditions of an alternative choice].
Ioseliani, T K; Sikharulidze, N I; Kadagishvili, A Ia; Mitashvili, E G
1995-01-01
It was shown that if the rats had been learned and then tested using conventional pain punishment of erroneous choice they were able to solve the problem of alternative choice only in the period of immediate action of conditioned stimuli. If the pain punishment for erroneously chosen compartment had not been applied in animal learning and testing, rats successfully solved the problem of alternative choice even after 5-second delay. Introduction of pain punishment led to the frustration of earlier elaborated delayed avoidance reactions. Analysis of the obtained results allows us to argue that the apparent incapability of white rats for solving the problems of delayed avoidance is caused by simultaneous action of two different mechanisms, i.e., those of the active and passive avoidance rather than short-term memory deficit.
10 CFR 905.22 - How does Western periodically evaluate customer actions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false How does Western periodically evaluate customer actions... Resource Planning § 905.22 How does Western periodically evaluate customer actions? (a) Periodic review of customer actions. Western will periodically evaluate customer actions to determine whether they are...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2012-10-01
CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less
ERIC Educational Resources Information Center
Saunders, Lesley
2007-01-01
This paper is written in a personal capacity and mainly takes the form of a poem--in five sections--composed as a response to some of the ideas in the article by Hannu Heikkinen and colleagues in this same issue of "Educational Action Research": "Action research as narrative: five principles for validation". The poem takes its…
2006-08-08
renovation from the four existing units would nearly equal tbe cost of reconstructing new lll’lils. No Action Alternative: tinder the11o action...cumulative impacts." 4.10 RELATIONSHIP BETWEEN-TERM USES AND ENHANCEMENT OF LONG- TERM PRODUCTIVITY Preferred Action: Implementation of the preferred...Indirect and Cumulative Impacts ........................................................................ 24 3.10 Relationship between Short-Term Uses
Gerlach, Kathy D.; Dornblaser, David W.; Schacter, Daniel L.
2013-01-01
People frequently engage in counterfactual thinking: mental simulations of alternative outcomes to past events. Like simulations of future events, counterfactual simulations serve adaptive functions. However, future simulation can also result in various kinds of distortions and has thus been characterized as an adaptive constructive process. Here we approach counterfactual thinking as such and examine whether it can distort memory for actual events. In Experiments 1a/b, young and older adults imagined themselves experiencing different scenarios. Participants then imagined the same scenario again, engaged in no further simulation of a scenario, or imagined a counterfactual outcome. On a subsequent recognition test, participants were more likely to make false alarms to counterfactual lures than novel scenarios. Older adults were more prone to these memory errors than younger adults. In Experiment 2, younger and older participants selected and performed different actions, then recalled performing some of those actions, imagined performing alternative actions to some of the selected actions, and did not imagine others. Participants, especially older adults, were more likely to falsely remember counterfactual actions than novel actions as previously performed. The findings suggest that counterfactual thinking can cause source confusion based on internally generated misinformation, consistent with its characterization as an adaptive constructive process. PMID:23560477
Gerlach, Kathy D; Dornblaser, David W; Schacter, Daniel L
2014-01-01
People frequently engage in counterfactual thinking: mental simulations of alternative outcomes to past events. Like simulations of future events, counterfactual simulations serve adaptive functions. However, future simulation can also result in various kinds of distortions and has thus been characterised as an adaptive constructive process. Here we approach counterfactual thinking as such and examine whether it can distort memory for actual events. In Experiments 1a/b young and older adults imagined themselves experiencing different scenarios. Participants then imagined the same scenario again, engaged in no further simulation of a scenario, or imagined a counterfactual outcome. On a subsequent recognition test participants were more likely to make false alarms to counterfactual lures than novel scenarios. Older adults were more prone to these memory errors than younger adults. In Experiment 2 younger and older participants selected and performed different actions, then recalled performing some of those actions, imagined performing alternative actions to some of the selected actions, and did not imagine others. Participants, especially older adults, were more likely to falsely remember counterfactual actions than novel actions as previously performed. The findings suggest that counterfactual thinking can cause source confusion based on internally generated misinformation, consistent with its characterisation as an adaptive constructive process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sackschewsky, Michael R.; Downs, Janelle L.
2007-05-31
This review provides an evaluation of potential impacts of actions that have been proposed under various alternatives to support the closure of the high level waste tanks on the Hanford Site. This review provides a summary of data collected in the field during the spring of 2007 at all of the proposed project sites within 200 East and 200 West Areas, and at sites not previously surveyed. The primary purpose of this review is to provide biological data that can be incorporated into or used to support the Tank Closure and Waste Management Environmental Impact Statement.
Jin, Shao-Feng; Feng, Ming-Guang; Ying, Sheng-Hua; Mu, Wen-Jing; Chen, Jue-Qi
2011-01-01
High resistance of brown planthopper (BPH) Nilaparvata lugens Stål to common insecticides is a challenge for control of the pest. An alternative control strategy based on the combined application of fungal and chemical agents has been evaluated. Three gradient spore concentrations of oil-formulated Metarhizium anisopliae (Metschnikoff) Sorokin (Ma456) were sprayed onto third-instar nymphs in five bioassays comprising the low buprofezin rates of 0, 10, 20, 30 and 40 µg mL(-1) respectively. Fungal LC(50) after 1 week at 25 °C and 14:10 h light:dark photoperiod decreased from 386 conidia mm(-2) in the buprofezin-free bioassay to 40 at the highest chemical rate. Buprofezin (LC(50): 1647, 486 and 233 µg mL(-1) on days 2 to 4) had no significant effect on the fungal outgrowths of mycosis-killed cadavers at the low application rates. The fungal infection was found to cause 81% reduction in reproductive potential of BPH adults. In two 40 day field trials, significant planthopper (mainly BPH) control (54-60%) was achieved by biweekly sprays of two fungal candidates (Ma456 and Ma576) at 1.5 × 10(13) conidia ha(-1) and elevated to 80-83% by incorporating 30.8 g buprofezin ha(-1) into the fungal sprays. The combined application of the fungal and chemical agents is a promising alternative strategy for BPH control. Copyright © 2010 Society of Chemical Industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finger, F.J.; Todd, Q.R.
An Environmental Investigation and Alternatives Assessment was conducted for the Crime Records Center at Fort Holabird in Baltimore, Maryland. Groundwater sampling, underground storage tank tightness testing, radon sampling, asbestos sampling, soil observations, and a review of previously collected data were used to develop remedial alternatives and recommendations. Removal and record keeping were recommended for asbestos. The recommendation for groundwater was no action.
Another Scale for the Assessment of Facial Paralysis? ADS Scale: Our Proposition, How to Use It.
Di Stadio, Arianna
2015-12-01
Several authors in the years propose different methods to evaluate areas and specific movement's disease in patient affected by facial palsy. Despite these efforts the House Brackmann is anyway the most used assessment in medical community. The aims of our study is the proposition and assessing a new rating Arianna Disease Scale (ADS) for the clinical evaluation of facial paralysis. Sixty patients affected by unilateral facial Bell paralysis were enrolled in a prospective study from 2012 to 2014. Their facial nerve function was evaluated with our assessment analysing facial district divided in upper, middle and lower third. We analysed different facial expressions. Each movement corresponded to the action of different muscles. The action of each muscle was scored from 0 to 1, with 0 corresponding from complete flaccid paralysis to muscle's normal function ending with a score of 1. Synkinesis was considered and evaluated also in the scale with a fixed 0.5 score. Our results considered ease and speed of evaluation of the assessment, the accuracy of muscle deficit and the ability to calculate synkinesis using a score. All the three observers agreed 100% in the highest degree of deficit. We found some discrepancies in intermediate score with 92% agreement in upper face, 87% in middle and 80% in lower face, where there were more muscles involved in movements. Our scale had some limitations linked to the small group of patients evaluated and we had a little difficulty understanding the intermediate score of 0.3 and 0.7. However, this was an accurate tool to quickly evaluate facial nerve function. This has potential as an alternative scale to and to diagnose facial nerve disorders.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
Edmonds, Lisa A; Donovan, Neila J
2014-06-01
Virtually no valid materials are available to evaluate confrontation naming in Spanish-English bilingual adults in the U.S. In a recent study, a large group of young Spanish-English bilingual adults were evaluated on An Object and Action Naming Battery (Edmonds & Donovan in Journal of Speech, Language, and Hearing Research 55:359-381, 2012). Rasch analyses of the responses resulted in evidence for the content and construct validity of the retained items. However, the scope of that study did not allow for extensive examination of individual item characteristics, group analyses of participants, or the provision of testing and scoring materials or raw data, thereby limiting the ability of researchers to administer the test to Spanish-English bilinguals and to score the items with confidence. In this study, we present the in-depth information described above on the basis of further analyses, including (1) online searchable spreadsheets with extensive empirical (e.g., accuracy and name agreeability) and psycholinguistic item statistics; (2) answer sheets and instructions for scoring and interpreting the responses to the Rasch items; (3) tables of alternative correct responses for English and Spanish; (4) ability strata determined for all naming conditions (English and Spanish nouns and verbs); and (5) comparisons of accuracy across proficiency groups (i.e., Spanish dominant, English dominant, and balanced). These data indicate that the Rasch items from An Object and Action Naming Battery are valid and sensitive for the evaluation of naming in young Spanish-English bilingual adults. Additional information based on participant responses for all of the items on the battery can provide researchers with valuable information to aid in stimulus development and response interpretation for experimental studies in this population.
Defining alternative rules in water and sanitation.
Robert, J
1995-11-01
While the conventional water and sanitation package remains most prominent, alternatives exist to conventional waterworks and sanitation practices. Some alternate courses of action are considered. Promising an unprecedented availability of piped water, water development projects foster a pump-and-dump mentality even before they are completed. Often simply announcing the impending implementation of such projects encourages the intention among future beneficiaries to waste water resources. Alternatives to the domestic waste of water must be sought and implemented. Disestablishing water development, styles of alternative water technologies, decision-making and decision-makers, water policy scale, regenerating community access to sources, and water pricing are discussed.
Kavlock, Robert; Cummings, Audrey
2005-01-01
Vinclozolin is a fungicide that has been shown to cause Leydig cell tumors and atrophy of the accessory sex glands in adult rodents. In addition, exposure of rats during pregnancy causes a pattern of malformations in the male urogenital tract. A wealth of standard toxicological studies and targeted research efforts is available related to this adverse effect, and these were used to evaluate the Human Relevance Framework (HRF) for noncancer health effects. Vinclozolin and two of its metabolites, designated M1 and M2, have been shown to bind and inhibit the function of the rat and human androgen receptor. Other means of interfering with androgen receptor function (e.g., by exposure to the pharmaceutical agent flutamide) lead to similar adverse health outcomes. There is direct in vivo evidence in the rat prostate that androgen-dependent gene expression changes occur after exposure to vinclozolin. There are no proposed alternatives to the androgen receptor-mediated mode of action. Based on what is known about kinetic and dynamic factors, confidence is high that the animal mode of action (MOA) for vinclozolin-induced malformation of the male reproductive tract is highly plausible in humans.
Thogmartin, Wayne E.; Crimmins, Shawn M.; Pearce, Jennie
2014-01-01
Large-scale planning for the conservation of species is often hindered by a poor understanding of factors limiting populations. In regions with declining wildlife populations, it is critical that objective metrics of conservation success are developed to ensure that conservation actions achieve desired results. Using spatially explicit estimates of bird abundance, we evaluated several management alternatives for conserving bird populations in the Prairie Hardwood Transition of the United States. We designed landscapes conserving species at 50% of their current predicted abundance as well as landscapes attempting to achieve species population targets (which often required the doubling of current abundance). Conserving species at reduced (half of current) abundance led to few conservation conflicts. However, because of extensive modification of the landscape to suit human use, strategies for achieving regional population targets for forest bird species would be difficult under even ideal circumstances, and even more so if maintenance of grassland bird populations is also desired. Our results indicated that large-scale restoration of agricultural lands to native grassland and forest habitats may be the most productive conservation action for increasing bird population sizes but the level of landscape transition required to approach target bird population sizes may be societally unacceptable.
The Emergence of Selective Attention through Probabilistic Associations between Stimuli and Actions.
Simione, Luca; Nolfi, Stefano
2016-01-01
In this paper we show how a multilayer neural network trained to master a context-dependent task in which the action co-varies with a certain stimulus in a first context and with a second stimulus in an alternative context exhibits selective attention, i.e. filtering out of irrelevant information. This effect is rather robust and it is observed in several variations of the experiment in which the characteristics of the network as well as of the training procedure have been varied. Our result demonstrates how the filtering out of irrelevant information can originate spontaneously as a consequence of the regularities present in context-dependent training set and therefore does not necessarily depend on specific architectural constraints. The post-evaluation of the network in an instructed-delay experimental scenario shows how the behaviour of the network is consistent with the data collected in neuropsychological studies. The analysis of the network at the end of the training process indicates how selective attention originates as a result of the effects caused by relevant and irrelevant stimuli mediated by context-dependent and context-independent bidirectional associations between stimuli and actions that are extracted by the network during the learning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
Preparing future fisheries professionals to make good decisions
Colvin, Michael E.; Peterson, James T.
2017-01-01
Future fisheries professionals will face decision-making challenges in an increasingly complex field of fisheries management. Though fisheries students are well trained in the use of the scientific method to understand the natural world, they are rarely exposed to structured decision making (SDM) as part of an undergraduate or graduate education. Specifically, SDM encourages users (e.g., students, managers) to think critically and communicate the problem and then identify specific, measurable objectives as they relate to the problem. Next, users must think critically and creatively about management alternatives that can be used to meet the objectives—there must be more than one alternative or there is no decision to be made. Lastly, the management alternatives are evaluated with regard to how likely they are to succeed in terms of multiple, possibly completing, objectives, such as how stakeholder groups value outcomes of management actions versus monetary cost. We believe that exposure to SDM and its elements is an important part of preparing future fisheries professional to meet the challenges they may face. These challenges include reduced budgets, the growth of potentially competing natural resource interest groups, and stakeholder desire to be involved in management decisions affecting public trust resources, just to name a few.
Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dutton, Spencer M.; Mendell, Mark J.; Chan, Wanyu R.
Minimum outdoor air ventilation rates (VRs) for buildings are specified in standards, including California?s Title 24 standards. The ASHRAE ventilation standard includes two options for mechanically-ventilated buildings ? a prescriptive ventilation rate procedure (VRP) that specifies minimum VRs that vary among occupancy classes, and a performance-based indoor air quality procedure (IAQP) that may result in lower VRs than the VRP, with associated energy savings, if IAQ meeting specified criteria can be demonstrated. The California Energy Commission has been considering the addition of an IAQP to the Title 24 standards. This paper, based on a review of prior data and newmore » analyses of the IAQP, evaluates four future options for Title 24: no IAQP; adding an alternate VRP, adding an equivalent indoor air quality procedure (EIAQP), and adding an improved ASHRAE-like IAQP. Criteria were established for selecting among options, and feedback was obtained in a workshop of stakeholders. Based on this review, the addition of an alternate VRP is recommended. This procedure would allow lower minimum VRs if a specified set of actions were taken to maintain acceptable IAQ. An alternate VRP could also be a valuable supplement to ASHRAE?s ventilation standard.« less
48 CFR 852.273-72 - Alternative evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Alternative evaluation... Alternative evaluation. As prescribed in 873.110(c), insert the following provision: Alternative Evaluation... unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). (End of...
38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...
38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...
38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...
38 CFR 18.406 - Remedial action, voluntary action and self-evaluation.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., voluntary action and self-evaluation. 18.406 Section 18.406 Pensions, Bonuses, and Veterans' Relief... Basis of Handicap General Provisions § 18.406 Remedial action, voluntary action and self-evaluation. (a... treatment within the program or activity. (b) Voluntary action. A recipient may take steps, in addition to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... impact of its actions on the environment, look at potential alternatives to that action, inform both decision-makers and the public of those impacts through a transparent process, and pursue mitigation if... and existing laws and regulations related to environment and historic preservation. Compliance under...
Code of Federal Regulations, 2012 CFR
2012-07-01
... affect the quality of the human environment. (4) Use the NEPA process to identify and assess reasonable alternatives to proposed actions that will avoid or minimize adverse effects of these actions upon the quality of the human environment. (5) Use all practicable means to restore and enhance the quality of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... affect the quality of the human environment. (4) Use the NEPA process to identify and assess reasonable alternatives to proposed actions that will avoid or minimize adverse effects of these actions upon the quality of the human environment. (5) Use all practicable means to restore and enhance the quality of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... affect the quality of the human environment. (4) Use the NEPA process to identify and assess reasonable alternatives to proposed actions that will avoid or minimize adverse effects of these actions upon the quality of the human environment. (5) Use all practicable means to restore and enhance the quality of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... affect the quality of the human environment. (4) Use the NEPA process to identify and assess reasonable alternatives to proposed actions that will avoid or minimize adverse effects of these actions upon the quality of the human environment. (5) Use all practicable means to restore and enhance the quality of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... affect the quality of the human environment. (4) Use the NEPA process to identify and assess reasonable alternatives to proposed actions that will avoid or minimize adverse effects of these actions upon the quality of the human environment. (5) Use all practicable means to restore and enhance the quality of the...
Learning in Action and Adventure Sports
ERIC Educational Resources Information Center
Ellmer, Eva; Rynne, Steven
2016-01-01
The exponential growth in action and adventure sport (e.g. snowboarding, bicycle motorcross (BMX), surfing, parkour) participation over the past two decades has been showcased in world championship events and the inclusion in Olympic programs. Yet, by virtue of their alternative, escapist and/or adventure-based origins, these sports do not fully…
75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... licenses, permits, and approvals for the highway and transit project. Tier 1 decisions also may be relied... Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone... eliminated from further consideration and study, including but not limited to, the No-Action Alternative...
Code of Federal Regulations, 2012 CFR
2012-10-01
... additional injury resulting from the proposed actions, including long-term and indirect impacts, to the... baseline condition, as measured in terms of the physical, chemical, or biological properties that the... resources to baseline conditions as quickly as possible, to natural recovery with minimal management actions...
The mode of toxic action (MOA) has been recognized as a key determinant of chemical toxicity and as an alternative to chemical class-based predictive toxicity modeling. However, the development of quantitative structure activity relationship (QSAR) and other models has been limit...
tThe mode of toxic action (MOA) has been recognized as a key determinant of chemical toxicity andas an alternative to chemical class-based predictive toxicity modeling. However, the development ofquantitative structure activity relationship (QSAR) and other models has been limite...
Administrative Leadership as Projection, Social Control, and Action.
ERIC Educational Resources Information Center
Reed, Donald B.
Over the past 50 years, theoretical and methodological problems have plagued the study of leadership. This paper, proposing an alternative theory, argues that leadership has three fundamental components: projection and social control, which are linked by action. Projection is the visualization of a project to be completed. Educational…
75 FR 62627 - Environmental Impact Statement; Davis County, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... County, UT AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent. SUMMARY: FWHA is... cooperation with the Utah Department of Transportation (UDOT), will prepare an EIS on a proposal to address... and need and are based on agency and public input. These alternatives include: (1) Taking no action...
75 FR 32201 - Tennessee National Wildlife Refuge, Henry, Benton, Decatur, and Humphreys Counties, TN
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-07
... Big Sandy peninsula. The cooperative farming and refuge staff (force account) program would continue... Alternative A in aiming to maintain existing habitat management programs, practices, and actions. Under... intensify existing habitat management programs, practices, and actions. We would improve the moist-soil...
32 CFR 651.43 - Format of the EIS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.43 Format of the EIS. The... following (detailed content is discussed in appendix E of this part): (a) Cover sheet. (b) Summary. (c) Table of contents. (d) Purpose of and need for the action. (e) Alternatives considered, including...