Sample records for evaluate alternative plans

  1. Urban Transportation Planning Short Course: Evaluation of Alternative Transportation Systems.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC.

    This urban transportation pamphlet delves into the roles of policy groups and technical staffs in evaluating alternative transportation plans, evaluation criteria, systems to evaluate, and evaluation procedures. The introduction admits the importance of subjective, but informed, judgment as an effective tool in weighing alternative transportation…

  2. Land management planning: a method of evaluating alternatives

    Treesearch

    Andres Weintraub; Richard Adams; Linda Yellin

    1982-01-01

    A method is described for developing and evaluating alternatives in land management planning. A structured set of 15 steps provides a framework for such an evaluation. when multiple objectives and uncertainty must be considered in the planning process. The method is consistent with other processes used in organizational evaluation, and allows for the interaction of...

  3. Shuttle payload vibroacoustic test plan evaluation. Free flyer payload applications and sortie payload parametric variations

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.

    1977-01-01

    A preliminary assessment of vibroacoustic test plan optimization for free flyer STS payloads is presented and the effects on alternate test plans for Spacelab sortie payloads number of missions are also examined. The component vibration failure probability and the number of components in the housekeeping subassemblies are provided. Decision models are used to evaluate the cost effectiveness of seven alternate test plans using protoflight hardware.

  4. Evaluation tools to support ITS planning process : development of a sketch planning tool in FSUTMS/cube environment.

    DOT National Transportation Integrated Search

    2008-12-15

    Intelligent Transportation Systems (ITS) planning requires the use of tools to assess the performance of ITS deployment alternatives relative to each other and to other types of transportation system improvement alternatives. This research project in...

  5. The Use of Multi-Criteria Evaluation and Network Analysis in the Area Development Planning Process

    DTIC Science & Technology

    2013-03-01

    layouts. The alternative layout scoring process, base in multi-criteria evaluation, returns a quantitative score for each alternative layout and a...The purpose of this research was to develop improvements to the area development planning process. These plans are used to improve operations within...an installation sub-section by altering the physical layout of facilities. One methodology was developed based on apply network analysis concepts to

  6. Parametric evaluation of the cost effectiveness of Shuttle payload vibroacoustic test plans

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Keegan, W. B.; Young, J. P.

    1978-01-01

    Consideration is given to alternate vibroacoustic test plans for sortie and free flyer Shuttle payloads. Statistical decision models for nine test plans provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology is a major step toward the development of a useful tool for the quantitative tailoring of vibroacoustic test programs to sortie and free flyer payloads. A broader application of the methodology is now possible by the use of the OCTAVE computer code.

  7. The Impact of Pay on Navy Physician Retention in a Health Care Reform Environment.

    DTIC Science & Technology

    1998-03-01

    Analyses 33 6. Generalist Physician Supply Under Alternative Specialty Mix 33 7. Specialist Physician Supply Under Alternative Specialty Mix 34 8...Fiscal Years 1992 to 1997 40 5. Comparison of proposed alternative pay plans 54 6. Evaluation of expected outcomes of alternative pay plans 55 7...Explanatory variables with the expected sign of regression coefficient 76 8. Comparison of Navy physicians’ pay to alternative civilian pay for selected

  8. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ...). The Plan/DEIS evaluates four alternatives for updating the current approach to management in Golden.... In recognition of the complexity of the proposed plan alternatives, and with deference to interest... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO-1108-8862; 2031-A038-409] Draft...

  9. Augmentative and Alternative Communication for Children with Autism Spectrum Disorder: An Evidence-Based Evaluation of the Language Acquisition through Motor Planning (LAMP) Programme

    ERIC Educational Resources Information Center

    Bedwani, Mary-Ann Naguib; Bruck, Susan; Costley, Debra

    2015-01-01

    Children diagnosed with autism spectrum disorder often have restricted verbal communication. For children who do not use functional speech, augmentative and alternative communication (AAC) devices can be an important support. We evaluated the effectiveness of one AAC programme, the Language Acquisition through Motor Planning (LAMP) using a Vantage…

  10. 15 CFR 990.54 - Restoration selection-evaluation of alternatives.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Restoration selection-evaluation of... ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.54 Restoration selection—evaluation of alternatives. (a) Evaluation standards. Once trustees have developed a reasonable...

  11. Fuzzy MCDM Technique for Planning the Environment Watershed

    NASA Astrophysics Data System (ADS)

    Chen, Yi-Chun; Lien, Hui-Pang; Tzeng, Gwo-Hshiung; Yang, Lung-Shih; Yen, Leon

    In the real word, the decision making problems are very vague and uncertain in a number of ways. The most criteria have interdependent and interactive features so they cannot be evaluated by conventional measures method. Such as the feasibility, thus, to approximate the human subjective evaluation process, it would be more suitable to apply a fuzzy method in environment-watershed plan topic. This paper describes the design of a fuzzy decision support system in multi-criteria analysis approach for selecting the best plan alternatives or strategies in environmentwatershed. The Fuzzy Analytic Hierarchy Process (FAHP) method is used to determine the preference weightings of criteria for decision makers by subjective perception. A questionnaire was used to find out from three related groups comprising fifteen experts. Subjectivity and vagueness analysis is dealt with the criteria and alternatives for selection process and simulation results by using fuzzy numbers with linguistic terms. Incorporated the decision makers’ attitude towards preference, overall performance value of each alternative can be obtained based on the concept of Fuzzy Multiple Criteria Decision Making (FMCDM). This research also gives an example of evaluating consisting of five alternatives, solicited from a environmentwatershed plan works in Taiwan, is illustrated to demonstrate the effectiveness and usefulness of the proposed approach.

  12. Shuttle payload minimum cost vibroacoustic tests

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    This paper is directed toward the development of the methodology needed to evaluate cost effective vibroacoustic test plans for Shuttle Spacelab payloads. Statistical decision theory is used to quantitatively evaluate seven alternate test plans by deriving optimum test levels and the expected cost for each multiple mission payload considered. The results indicate that minimum costs can vary by as much as $6 million for the various test plans. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level. Test plans using system testing or combinations of component and assembly level testing are attractive alternatives. Component testing alone is shown not to be cost effective.

  13. Integrating species distributional, conservation planning, and individual based population models: A case study in critical habitat evaluation for the Northern Spotted Owl

    EPA Science Inventory

    Background / Question / Methods As part of the ongoing northern spotted owl recovery planning effort, we evaluated a series of alternative potential critical habitat scenarios using a species-distribution model (MaxEnt), a conservation-planning model (Zonation), and an individua...

  14. Evaluation of origin-destination matrix estimation techniques to support aspects of traffic modeling.

    DOT National Transportation Integrated Search

    2014-05-01

    Travel demand forecasting models are used to predict future traffic volumes to evaluate : roadway improvement alternatives. Each of the metropolitan planning organizations (MPO) in : Alabama maintains a travel demand model to support planning efforts...

  15. An integrated approach for facilities planning by ELECTRE method

    NASA Astrophysics Data System (ADS)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with the existing layout; ELECTRE compares the alternatives based on their concordance and discordance indices. The alternatives were ranked from best to worst where regarding to the layouts concerned with the manufacturing area B.4 is the best alternative.

  16. Automated analysis of timber access road alternatives.

    Treesearch

    Doyle Burke

    1974-01-01

    The evaluation of timber access road alternatives is one of the primary tasks in timber harvest planning and design. During the planning stages, it is also one of the most difficult to accomplish quantitatively because a basis for comparison is related to such values as grade, length, horizontal and vertical curvature, and volumes of excavation and embankment. Within...

  17. Design and Simulation Plant Layout Using Systematic Layout Planning

    NASA Astrophysics Data System (ADS)

    Suhardini, D.; Septiani, W.; Fauziah, S.

    2017-12-01

    This research aims to design the factory layout of PT. Gunaprima Budiwijaya in order to increase production capacity. The problem faced by this company is inappropriate layout causes cross traffic on the production floor. The re-layout procedure consist of these three steps: analysing the existing layout, designing plant layout based on SLP and evaluation and selection of alternative layout using Simulation Pro model version 6. Systematic layout planning is used to re-layout not based on the initial layout. This SLP produces four layout alternatives, and each alternative will be evaluated based on two criteria, namely cost of material handling using Material Handling Evaluation Sheet (MHES) and processing time by simulation. The results showed that production capacity is increasing as much as 37.5% with the addition of the machine and the operator, while material handling cost was reduced by improvement of the layout. The use of systematic layout planning method reduces material handling cost of 10,98% from initial layout or amounting to Rp1.229.813,34.

  18. Planning for hazardous campus waste collection.

    PubMed

    Liu, Kun-Hsing; Shih, Shao-Yang; Kao, Jehng-Jung

    2011-05-15

    This study examines a procedure developed for planning a nation-wide hazardous campus waste (HCW) collection system. Alternative HCW plans were designed for different collection frequencies, truckloads, storage limits, and also for establishing an additional transfer station. Two clustering methods were applied to group adjacent campuses into clusters based on their locations, HCW quantities, the type of vehicles used and collection frequencies. Transportation risk, storage risk, and collection cost are the major criteria used to evaluate the feasibility of each alternative. Transportation risk is determined based on the accident rates for each road type and collection distance, while storage risk is calculated by estimating the annual average HCW quantity stored on campus. Alternatives with large trucks can reduce both transportation risk and collection cost, but their storage risks would be significantly increased. Alternatives that collect neighboring campuses simultaneously can effectively reduce storage risks as well as collection cost if the minimum quantity to collect for each group of neighboring campuses can be properly set. The three transfer station alternatives evaluated for northern Taiwan are cost effective and involve significantly lower transportation risk. The procedure proposed is expected to facilitate decision making and to support analyses for formulating a proper nation-wide HCW collection plan. Copyright © 2011 Elsevier B.V. All rights reserved.

  19. 78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...

  20. Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2005-01-01

    The objective of this project is to qualify candidate alternatives to Aliphatic Isocyanate Polyurethane coatings under the specifications for the standard system. This project will compare coating performance of the proposed alternatives to existing coating systems or standards.

  1. Comparing multi-criteria decision analysis and integrated assessment to support long-term water supply planning

    PubMed Central

    Maurer, Max; Lienert, Judit

    2017-01-01

    We compare the use of multi-criteria decision analysis (MCDA)–or more precisely, models used in multi-attribute value theory (MAVT)–to integrated assessment (IA) models for supporting long-term water supply planning in a small town case study in Switzerland. They are used to evaluate thirteen system scale water supply alternatives in four future scenarios regarding forty-four objectives, covering technical, social, environmental, and economic aspects. The alternatives encompass both conventional and unconventional solutions and differ regarding technical, spatial and organizational characteristics. This paper focuses on the impact assessment and final evaluation step of the structured MCDA decision support process. We analyze the performance of the alternatives for ten stakeholders. We demonstrate the implications of model assumptions by comparing two IA and three MAVT evaluation model layouts of different complexity. For this comparison, we focus on the validity (ranking stability), desirability (value), and distinguishability (value range) of the alternatives given the five model layouts. These layouts exclude or include stakeholder preferences and uncertainties. Even though all five led us to identify the same best alternatives, they did not produce identical rankings. We found that the MAVT-type models provide higher distinguishability and a more robust basis for discussion than the IA-type models. The needed complexity of the model, however, should be determined based on the intended use of the model within the decision support process. The best-performing alternatives had consistently strong performance for all stakeholders and future scenarios, whereas the current water supply system was outperformed in all evaluation layouts. The best-performing alternatives comprise proactive pipe rehabilitation, adapted firefighting provisions, and decentralized water storage and/or treatment. We present recommendations for possible ways of improving water supply planning in the case study and beyond. PMID:28481881

  2. Introduction to Psychology and Leadership. Typological Analysis of Student Characteristics: Preliminary Report.

    ERIC Educational Resources Information Center

    Bessemer, David W.; Shrage, Jules H.

    Recommendations for an alternative plan, based on typological analysis techniques, for the evaluation of student characteristics related to media, presentation design, and academic performance are presented. Difficulties with present evaluation plans are discussed, and different methods of typological analysis are described. Included are…

  3. A Report on Administrative Compensation Planning for St. Paul Public School Personnel.

    ERIC Educational Resources Information Center

    Hooker, Clifford P.; Mueller, Van D.

    This report describes and analyzes various devices and techniques that may be utilized in planning local school administrative compensation. The document outlines broad overall goals for compensation planning, describes and evaluates the application of a compensation plan in the St. Paul schools, and proposes alternative strategies for…

  4. Alternative Schools. Research Report 1976-3.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    During the 1970's, school districts throughout the country have created alternative educational programs allowing students and parents to choose the appropriate educational structure and methodology that suit their individual needs. School boards who establish alternative schools must assess, plan, design, effect, and evaluate educational programs…

  5. A methodology for decisionmaking in project evaluation in land management planning

    Treesearch

    A. Weintraub

    1978-01-01

    In order to evaluate alternative plans, wildland management planners must consider many objectives, such as timber production, recreational use, and community stability. The method presented utilizes the type of qualitative and intuitive information widely available to wildland management planners, and structures this information into a format suitable for...

  6. 75 FR 9921 - San Diego County Water Authority Natural Communities Conservation Program/Habitat Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... fossalis; threatened), thread-leaved brodiaea (Brodiaea filifolia; threatened), and willowy monardella... alternative. Two other alternatives were considered during the planning process, but were not evaluated in the...

  7. Gettysburg National Military Park alternative transportation system planning study

    DOT National Transportation Integrated Search

    2004-06-01

    This project identifies and evaluates transit service alternatives in the Gettysburg, Pennsylvania area, including Gettysburg National Military Park, the Borough of Gettysburg, and surrounding townships. The report concludes that public transit would...

  8. Plan of Study for the Tidal Power Study, Cobscook Bay, Maine, USA

    DTIC Science & Technology

    1978-09-01

    Considerations and Acceptability * Implementation Feasibility s Financial -Institutional Aspects * Public Health In preparing data for the System of Accounts ...Goals and Objectives a. National Objectives b. National Accounts c. Related National Policies d. The Study Objectives e. New England Federal Regional...Alternatives Development of Intermediate Plans 1. System of Accounts 2. Range of Alternatives to be considered 3. Other Evaluation Considerations 4

  9. Evaluating the effects of alternative forest management plans under various physiographic settings using historical records as a reference

    Treesearch

    Yangjian Zhang; Hong S. He; Stephen R. Shifley; Jian Yang; Brian J. Palik

    2011-01-01

    Using historical General Land Office record as a reference, this study employed a landscape-scale disturbance and succession model to estimate the future cumulative effects of six alternative management plans on the tree species composition for various physiographic settings for the Mark Twain National Forest in Missouri. The results indicate that over a 200-year...

  10. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  11. New Tool for Benefit-Cost Analysis in Evaluating Transportation Alternatives

    DOT National Transportation Integrated Search

    1997-01-01

    The Intermodal Surface Transportation Efficiency Act (ISTEA) emphasizes assessment of multi-modal alternatives and demand management strategies. In 1995, the Federal Highway Administration (FHWA) developed a corridor sketch planning tool called the S...

  12. Shuttle payload vibroacoustic test plan evaluation

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

  13. Louisiana's 2017 Master Plan for a Sustainable Coast

    NASA Astrophysics Data System (ADS)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  14. Strategy for Alternative Occupant Volume Testing

    DOT National Transportation Integrated Search

    2009-10-20

    This paper describes plans for a series of quasi-static : compression tests of rail passenger equipment. These tests are : designed to evaluate the strength of the occupant volume under : static loading conditions. The research plan includes a detail...

  15. Network Performance Evaluation Model for assessing the impacts of high-occupancy vehicle facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janson, B.N.; Zozaya-Gorostiza, C.; Southworth, F.

    1986-09-01

    A model to assess the impacts of major high-occupancy vehicle (HOV) facilities on regional levels of energy consumption and vehicle air pollution emissions in urban aeas is developed and applied. This model can be used to forecast and compare the impacts of alternative HOV facility design and operation plans on traffic patterns, travel costs, model choice, travel demand, energy consumption and vehicle emissions. The model is designed to show differences in the overall impacts of alternative HOV facility types, locations and operation plans rather than to serve as a tool for detailed engineering design and traffic planning studies. The Networkmore » Performance Evaluation Model (NETPEM) combines several urban transportation planning models within a multi-modal network equilibrium framework including modules with which to define the type, location and use policy of the HOV facility to be tested, and to assess the impacts of this facility.« less

  16. Integrating distributional, spatial prioritization, and individual-based models to evaluate potential critical habitat networks: A case study using the Northern Spotted Owl

    EPA Science Inventory

    As part of the northern spotted owl recovery planning effort, we evaluated a series of alternative critical habitat scenarios using a species-distribution model (MaxEnt), a conservation-planning model (Zonation), and an individual-based population model (HexSim). With this suite ...

  17. A collaborative fire hazard reduction/ecosystem restoration stewardship project in a Montana mixed ponderosa pine/Douglas-fir/western larch wildland urban interface

    Treesearch

    Steve Slaughter; Laura Ward; Michael Hillis; Jim Chew; Rebecca McFarlan

    2004-01-01

    Forest Service managers and researchers designed and evaluated alternative disturbance-based fire hazard reduction/ecosystem restoration treatments in a greatly altered low-elevation ponderosa pine/Douglas-fir/western larch wildland urban interface. Collaboratively planned improvement cutting and prescribed fire treatment alternatives were evaluated in simulations of...

  18. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  19. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  20. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  1. Optimal Living Environments for the Elderly: A Design Simulation Approach.

    ERIC Educational Resources Information Center

    Hoffman, Stephanie B.; And Others

    PLANNED AGE (Planned Alternatives for Gerontological Environments) is a consumer/advocate-oriented design simulation package that provides: (a) a medium for user-planner interaction in the design of living and service environments for the aged; (b) an educational, planning, design, and evaluation tool that can be used by the elderly, their…

  2. 7 CFR 650.5 - Environmental evaluation in planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if appropriate. (4) To perform other related investigations and analyses as needed, including economic evaluation...

  3. 75 FR 10305 - Environmental Impact Statement and Habitat Conservation Plan for the Incidental Take of Seven...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Statement (EIS) to evaluate the impacts of, and alternatives to, the proposed issuance of an Endangered... alternatives and issues to be addressed in the draft EIS must be received by close of business on June 3, 2010... gather the information necessary to determine impacts and alternatives to support a decision regarding...

  4. Building Low Carbon Cities: Framework to Design and Evaluate Alternative Technologies and Policies for Land Use Planning

    NASA Astrophysics Data System (ADS)

    Hashimoto, S.; Hamano, H.; Fujita, T.; Hori, H.

    2008-12-01

    Annex I parties of the Kyoto Protocol are facing even greater pressures to fulfill their commitment for GHG reduction as they enter the first commitment period of the Kyoto Protocol 2008-2012. In Japanese context, one such challenge is to reduce CO2 emissions from the household and business sectors because CO2 emissions from the both sectors has increased by 12% and 20% respectively since 1990 while the industry has achieved 21% of CO2 emissions reduction. Land use planning, which, either directly or indirectly, controls appropriate uses for land within jurisdictions, might play very important roles to deal with CO2 reductions from the household and business sectors. In this research, aiming at effective reductions of air- conditioning energy consumption and resultant CO2 emissions from the household and business sectors, the framework to design and evaluate land use planning was developed. The design and evaluation processes embraced in this framework consist of GIS database, technology and policy inventory for planning, one- dimensional urban canopy model which evaluate urban climate at neighborhood level and air-conditioning load calculation procedure. The GIS database provides spatial information of target areas such as land use, building use and road networks, which, then, helps design alternative land use plans. The technology and policy inventory includes various planning options ranging from those for land over control to those for building energy control, which, combined with the GIS database, serves for planning process. The urban canopy model derives vertical profiles of local climate, such as temperature and humidity, using the information of land use, building height and so on, aided by the GIS database. Vertical profiles of the urban climate are then utilized to derive air-conditioning load and associated CO2 emissions for each building located in target areas. The framework developed was applied to the coastal district of Kawasaki, Japan, with an area of 40 square kilometers, for August 2006, to explore effective combinations of technologies and policies for land use planning. Six alternative land use policies were designed, including BaU in which current land use continues, and were, then, evaluated to seek more effective alternatives. Our findings suggested that about 541 MWh power and 204 tons of CO2 emission be saved at maximum by greening building sites, introducing water retentive pavement and installing energy-saving technologies for buildings in an appropriate manner.

  5. Optimizing Perioperative Decision Making: Improved Information for Clinical Workflow Planning

    PubMed Central

    Doebbeling, Bradley N.; Burton, Matthew M.; Wiebke, Eric A.; Miller, Spencer; Baxter, Laurence; Miller, Donald; Alvarez, Jorge; Pekny, Joseph

    2012-01-01

    Perioperative care is complex and involves multiple interconnected subsystems. Delayed starts, prolonged cases and overtime are common. Surgical procedures account for 40–70% of hospital revenues and 30–40% of total costs. Most planning and scheduling in healthcare is done without modern planning tools, which have potential for improving access by assisting in operations planning support. We identified key planning scenarios of interest to perioperative leaders, in order to examine the feasibility of applying combinatorial optimization software solving some of those planning issues in the operative setting. Perioperative leaders desire a broad range of tools for planning and assessing alternate solutions. Our modeled solutions generated feasible solutions that varied as expected, based on resource and policy assumptions and found better utilization of scarce resources. Combinatorial optimization modeling can effectively evaluate alternatives to support key decisions for planning clinical workflow and improving care efficiency and satisfaction. PMID:23304284

  6. Optimizing perioperative decision making: improved information for clinical workflow planning.

    PubMed

    Doebbeling, Bradley N; Burton, Matthew M; Wiebke, Eric A; Miller, Spencer; Baxter, Laurence; Miller, Donald; Alvarez, Jorge; Pekny, Joseph

    2012-01-01

    Perioperative care is complex and involves multiple interconnected subsystems. Delayed starts, prolonged cases and overtime are common. Surgical procedures account for 40-70% of hospital revenues and 30-40% of total costs. Most planning and scheduling in healthcare is done without modern planning tools, which have potential for improving access by assisting in operations planning support. We identified key planning scenarios of interest to perioperative leaders, in order to examine the feasibility of applying combinatorial optimization software solving some of those planning issues in the operative setting. Perioperative leaders desire a broad range of tools for planning and assessing alternate solutions. Our modeled solutions generated feasible solutions that varied as expected, based on resource and policy assumptions and found better utilization of scarce resources. Combinatorial optimization modeling can effectively evaluate alternatives to support key decisions for planning clinical workflow and improving care efficiency and satisfaction.

  7. Evaluation of alternatives for best available technology treatment and retreatment of uranium-contaminated wastewater at the Paducah Gaseous Diffusion Plant C-400 Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Cul, G.D.; Osborne, P.E.; Beck, D.E.

    1991-01-01

    The Paducah Gaseous Diffusion Plant (PGDP) C-400 Decontamination Facility generates aqueous solutions that originate in drum washing, machine parts and equipment cleaning, and other decontamination processes. The chemical composition of the waste depends on the particular operation involved. In general, the waste contains uranyl, fluoride, carbonate, and nitrate ions, plus soaps, detergents, secondary contaminants, and particulate matter. The uranium content is rather variable ranging between 0.5 and 30 g/l. The main contaminants are fluoride, technetium, uranium, and other heavy metals. The plan included (1) a literature search to support best available technology (BAT) evaluation of treatment alternatives, (2) a qualitymore » assurance/quality control plan, (3) suggestion of alternative treatment options, (4) bench-scale tests studies of the proposed treatment alternatives, and (5) establishment of the final recommendation. The following report records the evaluation of items (1) to (3) of the action plan for the BAT evaluation of alternatives for the treatment and retreatment of uranium-contaminated wastewater at the PGDP C-400 treatment facility. After a thorough literature search, five major technologies were considered: (1) precipitation/coprecipitation, (2) reverse osmosis, (3) ultrafiltration, (4) supported liquid membranes, and (5) ion exchange. Biosorption was also considered, but as it is a fairly new technology with few demonstrations of its capabilities, it is mentioned only briefly in the report. Based on C-400's requirements and facilities, the precipitation/coprecipitation process appears to be the best suited for use at the plant. Four different treatment options using the precipitation/coprecipitation technology are proposed. Bench-scale studies of the four options are suggested. 37 refs.« less

  8. A Shovel-Ready Solution to Fill the Nursing Data Gap in the Interdisciplinary Clinical Picture.

    PubMed

    Keenan, Gail M; Lopez, Karen Dunn; Sousa, Vanessa E C; Stifter, Janet; Macieira, Tamara G R; Boyd, Andrew D; Yao, Yingwei; Herdman, T Heather; Moorhead, Sue; McDaniel, Anna; Wilkie, Diana J

    2018-01-01

    To critically evaluate 2014 American Academy of Nursing (AAN) call-to-action plan for generating interoperable nursing data. Healthcare literature. AAN's plan will not generate the nursing data needed to participate in big data science initiatives in the short term because Logical Observation Identifiers Names and Codes and Systematized Nomenclature of Medicine - Clinical Terms are not yet ripe for generating interoperable data. Well-tested viable alternatives exist. Authors present recommendations for revisions to AAN's plan and an evidence-based alternative to generating interoperable nursing data in the near term. These revisions can ultimately lead to the proposed terminology goals of the AAN's plan in the long term. © 2017 NANDA International, Inc.

  9. Alternative Futures Analysis Of Farmington Bay Wetlands In The Great Salt Lake Ecosystem

    EPA Science Inventory

    An Alternative Futures Analysis (AFA) was conducted to evaluate tradeoffs between landscape design scenarios and ecological services for Farmington Bay, Great Salt Lake (GSL), wetlands. Model scenarios included both plan trend and conservation "futures" projected to 2030. Scena...

  10. AN ALTERNATIVE FUTURES ANALYSIS OF FARMINGTON BAY WETLANDS IN THE GREAT SALT LAKE

    EPA Science Inventory

    An Alternative Futures Analysis (AFA) was conducted to evaluate tradeoffs between landscape design scenarios and ecological services for Farmington Bay, Great Salt Lake (GSL), wetlands. Model scenarios included plan trend and conservation "futures" scenarios projected to 2030. ...

  11. Multicriteria analysis as a tool to investigate compatibility between conservation and development on Salina Island, Aeolian Archipelago, Italy

    NASA Astrophysics Data System (ADS)

    Bodini, Antonio; Giavelli, Giovanni

    1992-09-01

    Several multicriteria evaluation techniques have been developed since the 1970s. The need to compare different territorial policies has justified their introduction into environmental research. These methods are based on the numerical manipulation of heterogeneous information, which varies in terms of reference scale and type of measure (continuous, ordinal, qualitative, binary, etc.). During recent years, diverse investigations have focused on general conditions on Salina, the “green island” of the Aeolian archipelago. Such studies, within an interdisciplinary project, aimed to explore the possibility of implementing conservation strategies that are compatible with human needs, landscape preservation, and sustainable economic development. Three different evaluation techniques are applied, namely multicriteria weighted concordance and discordance analysis and a qualitative procedure. They are used to compare four alternative plans for the socioeconomic development of Salina Island. These plans lie between extreme alternatives: total protection of natural resources and maximizing economic development based on tourism. The plans are compared to each other on the basis of 14 criteria that reflect the socioenvironmental perception of Salina's inhabitants. The approach used in this research seems particularly fruitful because of its flexibility: it offers decision makers the chance to manage heterogeneous data and information that is not easily quantifiable. Such “soft” information helps to evaluate environmental conditions more precisely, and to make a less damaging choice among alternative development plans.

  12. Evaluation of Robustness to Setup and Range Uncertainties for Head and Neck Patients Treated With Pencil Beam Scanning Proton Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malyapa, Robert; Lowe, Matthew; Christie Medical Physics and Engineering, The Christie NHS Foundation Trust, Manchester

    Purpose: To evaluate the robustness of head and neck plans for treatment with intensity modulated proton therapy to range and setup errors, and to establish robustness parameters for the planning of future head and neck treatments. Methods and Materials: Ten patients previously treated were evaluated in terms of robustness to range and setup errors. Error bar dose distributions were generated for each plan, from which several metrics were extracted and used to define a robustness database of acceptable parameters over all analyzed plans. The patients were treated in sequentially delivered series, and plans were evaluated for both the first seriesmore » and for the combined error over the whole treatment. To demonstrate the application of such a database in the head and neck, for 1 patient, an alternative treatment plan was generated using a simultaneous integrated boost (SIB) approach and plans of differing numbers of fields. Results: The robustness database for the treatment of head and neck patients is presented. In an example case, comparison of single and multiple field plans against the database show clear improvements in robustness by using multiple fields. A comparison of sequentially delivered series and an SIB approach for this patient show both to be of comparable robustness, although the SIB approach shows a slightly greater sensitivity to uncertainties. Conclusions: A robustness database was created for the treatment of head and neck patients with intensity modulated proton therapy based on previous clinical experience. This will allow the identification of future plans that may benefit from alternative planning approaches to improve robustness.« less

  13. Planning Strategies for Transportation Fuel Consumption Reduction: An Evaluation of the Hawaii Clean Energy Initiative’s Transportation Plan

    DTIC Science & Technology

    2014-04-01

    technologies to improve fleet efficiency goals, and evaluate switching to biodiesel for trucks and vehicles without other alternatives (HCEI 2011...standards and biodiesel usage levels 2020 Goal 50 MGY of renewable fuels 28 working with industry to increase EV market penetration, and...Strategy Reduction Potential Purchase more efficient vehicles 10-20% Promote hybrid technologies 10-20% Evaluate biodiesel switching (freight) TBD

  14. Concept design and alternate arrangements of orbiter mid-deck habitability features

    NASA Technical Reports Server (NTRS)

    Church, R. A.; Ciciora, J. A.; Porter, K. L.; Stevenson, G. E.

    1976-01-01

    The evaluations and recommendations for habitability features in the space shuttle orbiter mid-deck are summarized. The orbiter mission plans, the mid-deck dimensions and baseline arrangements along with crew compliments and typical activities were defined. Female and male anthropometric data based on zero-g operations were also defined. Evaluations of baseline and alternate feasible concepts provided several recommendations which are discussed.

  15. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  16. Planning for Capital Reinvestment.

    ERIC Educational Resources Information Center

    Biedenweg, Frederick; Weisburg-Swanson, Lynda; Gardner, Catherine

    1998-01-01

    Describes and evaluates four alternatives for planning and budgeting for capital reinvestment for college and university facilities: physical plant auditing; a depreciation-based approach; percentage of current replacement value; and facility subsystem modeling, or life-cycle modeling. Each has advantages and limitations in budgeting for and…

  17. SIMULATION MODEL FOR WATERSHED MANAGEMENT PLANNING. VOLUME 2. MODEL USER MANUAL

    EPA Science Inventory

    This report provides a user manual for the hydrologic, nonpoint source pollution simulation of the generalized planning model for evaluating forest and farming management alternatives. The manual contains an explanation of application of specific code and indicates changes that s...

  18. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  19. Using occupancy estimation to assess the effectiveness of a regional multiple-species conservation plan: bats in the Pacific Northwest

    Treesearch

    Theodore Weller

    2008-01-01

    Regional conservation plans are increasingly used to plan for and protect biodiversity at large spatial scales however the means of quantitatively evaluating their effectiveness are rarely specified. Multiple-species approaches, particular those which employ site-occupancy estimation, have been proposed as robust and efficient alternatives for assessing the status of...

  20. Prevention-Related Research Targeting African American Alternative Education Program Students

    ERIC Educational Resources Information Center

    Carswell, Steven B.; Hanlon, Thomas E.; Watts, Amy M.; O'Grady, Kevin E.

    2014-01-01

    This article reports on a program of research that examined the background, planning, implementation, and evaluation of an after-school preventive intervention program within an ongoing urban alternative education program targeting African American students referred to the school because of their problematic behavior in regular schools. The…

  1. Policy options evaluation tool for managed lanes (POET-ML) users guide and methodology description : Federal Highway Administration HOV lane performance

    DOT National Transportation Integrated Search

    2008-12-01

    Users guide for a sketch planning tool for exploring policy alternatives. It is intended for an audience of transportation professionals responsible for planning, designing, funding, operating, enforcing, monitoring, and managing HOV and HOT lanes...

  2. TU-AB-BRB-01: Coverage Evaluation and Probabilistic Treatment Planning as a Margin Alternative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siebers, J.

    The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less

  3. The role of flight planning in aircrew decision performance

    NASA Technical Reports Server (NTRS)

    Pepitone, Dave; King, Teresa; Murphy, Miles

    1989-01-01

    The role of flight planning in increasing the safety and decision-making performance of the air transport crews was investigated in a study that involved 48 rated airline crewmembers on a B720 simulator with a model-board-based visual scene and motion cues with three degrees of freedom. The safety performance of the crews was evaluated using videotaped replays of the flight. Based on these evaluations, the crews could be divided into high- and low-safety groups. It was found that, while collecting information before flights, the high-safety crews were more concerned with information about alternative airports, especially the fuel required to get there, and were characterized by making rapid and appropriate decisions during the emergency part of the flight scenario, allowing these crews to make an early diversion to other airports. These results suggest that contingency planning that takes into account alternative courses of action enhances rapid and accurate decision-making under time pressure.

  4. Capacity Value: Evaluation of WECC Rule of Thumb; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milligan, Michael; Ibanez, Eduardo

    2015-06-09

    This presentation compares loss of load expectation and wind and solar capacity values to the rules of thumb used in the Western Interconnection planning and provides alternative recommendations to the modeling efforts of the Western Electricity Coordinating Council's Transmission Expansion Planning Policy Committee.

  5. Economic Evaluation of Munitions Manufacturing Pink Wastewater Treatment Alternatives Using a Present Value-Unit Cost Methodology

    DTIC Science & Technology

    1982-02-01

    BACKGROUND 1 1.2 TECHNICAL APPROACH 3 1.3 OBJECTIVES 3 2.0 INVESTIGATION 5 2.1 LITERATURE SEARCH 5 2.2 SITE ViSITS 6 2.3 PINK WATER SOURCES AND...Scale 10 5 and 106 GPD Plant Designs 13 3.1 Matrix of Pink Water Treatment Systems Compared on a PVUC Basis 28 3.2 Calculated Capital & Annual... 5 Year Planning Horizon 109 3.6 Calculated PVUC ($/K-GAL) for Each Alternative - 1,000,000 GPD - 5 Year Planning Horizon 110 3.7 Calculated Annual

  6. The need for strategic tax planning among nonprofit hospitals.

    PubMed

    Smith, Pamela C

    2005-01-01

    Strategic tax planning issues are important to the nonprofit health care sector, despite its philanthropic mission. The consolidation of the industry has led management to fight for resources and develop alternative strategies for raising money. When management evaluates alternative collaborative structures to increase efficiency, the impact on governance structures must also be considered. The increased governmental scrutiny of joint ventures within the health care sector warrants management's attention as well. The financial incentives must be considered, along with the various tax policy implications of cross-sector collaborations.

  7. 75 FR 59323 - Early Scoping for the Alternatives Analysis of the North Corridor Transit Project in Metropolitan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... impacts and benefits to be considered, the capital and operating costs, the financial plans and other... evaluating the costs, benefits, and impacts of a range of transportation alternatives designed to address... maintenance costing, and environmental and land use analyses. Finally, costs, benefits, and impacts of each...

  8. Alternative Education for Disruptive Youth: Recommended Parameters and Best Practices for Effective Programs

    ERIC Educational Resources Information Center

    Pennsylvania Department of Education, 2005

    2005-01-01

    This document was prepared to serve as an aid in the planning, design, implementation, and ongoing evaluation of Alternative Education for Disruptive Youth Programs in Pennsylvania. School Codes and Public Laws are cited for guidance on mandatory issues. The suggestions and implementation strategies provided in this document are not requirements…

  9. Evaluation of sludge management alternatives in Istanbul metropolitan area.

    PubMed

    Cakmakci, M; Erdim, E; Kinaci, C; Akca, L

    2005-01-01

    The main concern of this paper was to predict the sludge quantities generated from 18 wastewater treatment plants, which were stated to be established in the "Istanbul Water Supply, Sewerage and Drainage, Sewage Treatment and Disposal Master Plan", 10 of which are in operation at present. Besides this, obtaining the required data to compare various treatment schemes was another goal of the study. Especially, the estimation of the sludge quantity in the case of enhanced primary sedimentation was of importance. Wastewater sludge management strategies were discussed in order to develop suggestions for Istanbul Metropolitan city. Within this context, the wastewater treatment facilities, mentioned in the Master Plan that had been completed by 2000, were evaluated in terms of sludge production rates, locations and technical and management aspects. Disposal alternatives of the wastewater treatment sludge were also evaluated in this study. Using of the dewatered sludge as a landfill cover material seems the best alternative usage. Up to the year of 2040, the requirement of cover material for landfills in Istanbul will be met by the dewatered sludge originated from wastewater treatment plants in the region.

  10. A Model for Evaluating Development Programs. Miscellaneous Report.

    ERIC Educational Resources Information Center

    Burton, John E., Jr.; Rogers, David L.

    Taking the position that the Classical Experimental Evaluation (CEE) Model does not do justice to the process of acquiring information necessary for decision making re planning, programming, implementing, and recycling program activities, this paper presents the Inductive, System-Process (ISP) evaluation model as an alternative to be used in…

  11. Corrective Action Investigation Plan for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada (Rev. 0 / June 2003), Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less

  12. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  13. 40 CFR 62.14471 - When must I comply with this subpart if I plan to shut down?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators... documentation must include an evaluation of the option to transport your waste offsite to a commercial medical... an onsite alternative waste treatment technology before you shut down your HMIWI, Date when you will...

  14. Evaluating alternative methods for biophysical and cultural ecosystem services hotspot mapping in natural resource planning

    USGS Publications Warehouse

    Bagstad, Kenneth J.; Semmens, Darius J.; Ancona, Zachary H.; Sherrouse, Ben C.

    2017-01-01

    Statistical hotspot methods of intermediate conservatism (i.e., Getis-Ord Gi*, α = 0.10 significance) may be most useful for ecosystem service hot/coldspot mapping to inform landscape scale planning. We also found spatially explicit evidence in support of past findings about public attitudes toward wilderness areas.

  15. Reference condition approach to restoration planning

    USGS Publications Warehouse

    Nestler, J.M.; Theiling, C.H.; Lubinski, S.J.; Smith, D.L.

    2010-01-01

    Ecosystem restoration planning requires quantitative rigor to evaluate alternatives, define end states, report progress and perform environmental benefits analysis (EBA). Unfortunately, existing planning frameworks are, at best, semi-quantitative. In this paper, we: (1) describe a quantitative restoration planning approach based on a comprehensive, but simple mathematical framework that can be used to effectively apply knowledge and evaluate alternatives, (2) use the approach to derive a simple but precisely defined lexicon based on the reference condition concept and allied terms and (3) illustrate the approach with an example from the Upper Mississippi River System (UMRS) using hydrologic indicators. The approach supports the development of a scaleable restoration strategy that, in theory, can be expanded to ecosystem characteristics such as hydraulics, geomorphology, habitat and biodiversity. We identify three reference condition types, best achievable condition (A BAC), measured magnitude (MMi which can be determined at one or many times and places) and desired future condition (ADFC) that, when used with the mathematical framework, provide a complete system of accounts useful for goal-oriented system-level management and restoration. Published in 2010 by John Wiley & Sons, Ltd.

  16. Alternatives to Re-Planning: Methods for Plan Re-Evaluation at Runtime

    NASA Technical Reports Server (NTRS)

    Benazera, Emmanuel

    2005-01-01

    Current planning algorithms have difficulty handling the complexity that is due to an increase in domain uncertainty, and especially in the case of multi-dimensional continuous spaces. Therefore, they produce plans that do not take into account numerous situations that can occur at runtime, such as faults or other changes in the planning domain itself. Thus there is a gap between the plan generation and the reality experienced at runtime. Here we present two methods that allow the plan conditionals to be revised w.r.t. uncertainty on the system as estimated at runtime.

  17. 40 CFR 35.917-5 - Public participation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... identification and evaluation of locations for waste water treatment facilities and of alternative treatment... treatment, reduce waste water volume, and encourage multiple use of facilities; (3) The evaluation of social... planning issues and decisions. (b) Basic Public Participation Program. Since waste water treatment...

  18. Fort Holabird Defense Investigative Service (DIS), Base Realignment and Closure (BRAC) Cleanup Plan (BCP), Version II

    DTIC Science & Technology

    1998-12-01

    3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC

  19. 46 CFR 8.535 - Training and operational evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Training and operational evaluation. 8.535 Section 8.535... ALTERNATIVES Streamlined Inspection Program § 8.535 Training and operational evaluation. When the CAP and VAP(s) have been approved by the cognizant OCMI, the company may begin training and operating under the plans...

  20. 40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... alternative waste treatment technology before you shut down your CISWI (1) Date when you will enter into a... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...

  1. 40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... alternative waste treatment technology before you shut down your CISWI (1) Date when you will enter into a... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...

  2. Evaluating fuel complexes for fire hazard mitigation planning in the southeastern United States

    Treesearch

    Anne G. Andreu; Dan Shea; Bernard R. Parresol; Roger D. Ottmar

    2012-01-01

    Fire hazard mitigation planning requires an accurate accounting of fuel complexes to predict potential fire behavior and effects of treatment alternatives. In the southeastern United States, rapid vegetation growth coupled with complex land use history and forest management options requires a dynamic approach to fuel characterization. In this study we assessed...

  3. Utilization of cone-beam CT for offline evaluation of target volume coverage during prostate image-guided radiotherapy based on bony anatomy alignment.

    PubMed

    Paluska, Petr; Hanus, Josef; Sefrova, Jana; Rouskova, Lucie; Grepl, Jakub; Jansa, Jan; Kasaova, Linda; Hodek, Miroslav; Zouhar, Milan; Vosmik, Milan; Petera, Jiri

    2012-01-01

    To assess target volume coverage during prostate image-guided radiotherapy based on bony anatomy alignment and to assess possibility of safety margin reduction. Implementation of IGRT should influence safety margins. Utilization of cone-beam CT provides current 3D anatomic information directly in irradiation position. Such information enables reconstruction of the actual dose distribution. Seventeen prostate patients were treated with daily bony anatomy image-guidance. Cone-beam CT (CBCT) scans were acquired once a week immediately after bony anatomy alignment. After the prostate, seminal vesicles, rectum and bladder were contoured, the delivered dose distribution was reconstructed. Target dose coverage was evaluated by the proportion of the CTV encompassed by the 95% isodose. Original plans employed a 1 cm safety margin. Alternative plans assuming a smaller 7 mm margin between CTV and PTV were evaluated in the same way. Rectal and bladder volumes were compared with the initial ones. Rectal and bladder volumes irradiated with doses higher than 75 Gy, 70 Gy, 60 Gy, 50 Gy and 40 Gy were analyzed. In 12% of reconstructed plans the prostate coverage was not sufficient. The prostate underdosage was observed in 5 patients. Coverage of seminal vesicles was not satisfactory in 3% of plans. Most of the target underdosage corresponded to excessive rectal or bladder filling. Evaluation of alternative plans assuming a smaller 7 mm margin revealed 22% and 11% of plans where prostate and seminal vesicles coverage, respectively, was compromised. These were distributed over 8 and 7 patients, respectively. Sufficient dose coverage of target volumes was not achieved for all patients. Reducing of safety margin is not acceptable. Initial rectal and bladder volumes cannot be considered representative for subsequent treatment.

  4. Robustness in practice--the regional planning of health services.

    PubMed

    Best, G; Parston, G; Rosenhead, J

    1986-05-01

    Earlier work has criticized the dominant tendencies in operational research contributions to health services planning as characterized by optimization, implausible demands for data, depoliticization, hierarchy and inflexibility. This paper describes an effort which avoids at least some of these pitfalls. The project was to construct a planning system for a regional health council in Ontario, Canada, which would take account of the possible alternative future states of the health-care system's environment and would aim to keep options for future development open. The planning system devised is described in the paper. It is based on robustness analysis, which evaluates alternative initial action sets in terms of the useful flexibility they preserve. Other features include the explicit incorporation of pressures for change generated outside the health-care system, and a satisficing approach to the identification of both initial action sets and alternative future configurations of the health-care system. It was found possible to borrow and radically 're-use' techniques or formulations from the mainstream of O.R. contributions. Thus the 'reference projection' method was used to identify inadequacies in performance which future health-care system configurations must repair. And Delphi analysis, normally a method for generating consensus, was used in conjunction with cluster analysis of responses to generate meaningfully different alternative futures.

  5. Evaluating forest product potential as part of planning ecological restoration treatments on forested landscapes

    Treesearch

    R. James Barbour; Ryan Singleton; Douglas A. Maguire

    2007-01-01

    As landscape-scale assessments and modeling become a more common method for evaluating alternatives in integrated resource management, new techniques are needed to display and evaluate outcomes for large numbers of stands over long periods. In this proof of concept, we evaluate the potential to provide financial support for silvicultural treatments by selling timber...

  6. RiskChanges Spatial Decision Support system for the analysis of changing multi-hazard risk

    NASA Astrophysics Data System (ADS)

    van Westen, Cees; Zhang, Kaixi; Bakker, Wim; Andrejchenko, Vera; Berlin, Julian; Olyazadeh, Roya; Cristal, Irina

    2015-04-01

    Within the framework of the EU FP7 Marie Curie Project CHANGES and the EU FP7 Copernicus project INCREO a spatial decision support system was developed with the aim to analyse the effect of risk reduction planning alternatives on reducing the risk now and in the future, and support decision makers in selecting the best alternatives. Central to the SDSS are the stakeholders. The envisaged users of the system are organizations involved in planning of risk reduction measures, and that have staff capable of visualizing and analyzing spatial data at a municipal scale. The SDSS should be able to function in different countries with different legal frameworks and with organizations with different mandates. These could be subdivided into Civil protection organization with the mandate to design disaster response plans, Expert organizations with the mandate to design structural risk reduction measures (e.g. dams, dikes, check-dams etc), and planning organizations with the mandate to make land development plans. The SDSS can be used in different ways: analyzing the current level of risk, analyzing the best alternatives for risk reduction, the evaluation of the consequences of possible future scenarios to the risk levels, and the evaluation how different risk reduction alternatives will lead to risk reduction under different future scenarios. The SDSS is developed based on open source software and following open standards, for code as well as for data formats and service interfaces. Code development was based upon open source software as well. The architecture of the system is modular. The various parts of the system are loosely coupled, extensible, using standards for interoperability, flexible and web-based. The Spatial Decision Support System is composed of a number of integrated components. The Risk Assessment component allows to carry out spatial risk analysis, with different degrees of complexity, ranging from simple exposure (overlay of hazard and assets maps) to quantitative analysis (using different hazard types, temporal scenarios and vulnerability curves) resulting into risk curves. The platform does not include a component to calculate hazard maps, and existing hazard maps are used as input data for the risk component. The second component of the SDSS is a risk reduction planning component, which forms the core of the platform. This component includes the definition of risk reduction alternatives (related to disaster response planning, risk reduction measures and spatial planning) and links back to the risk assessment module to calculate the new level of risk if the measure is implemented, and a cost-benefit (or cost-effectiveness/ Spatial Multi Criteria Evaluation) component to compare the alternatives and make decision on the optimal one. The third component of the SDSS is a temporal scenario component, which allows to define future scenarios in terms of climate change, land use change and population change, and the time periods for which these scenarios will be made. The component doesn't generate these scenarios but uses input maps for the effect of the scenarios on the hazard and assets maps. The last component is a communication and visualization component, which can compare scenarios and alternatives, not only in the form of maps, but also in other forms (risk curves, tables, graphs)

  7. Water resources planning based on complex system dynamics: A case study of Tianjin city

    NASA Astrophysics Data System (ADS)

    Zhang, X. H.; Zhang, H. W.; Chen, B.; Chen, G. Q.; Zhao, X. H.

    2008-12-01

    A complex system dynamic (SD) model focusing on water resources, termed as TianjinSD, is developed for the integrated and scientific management of the water resources of Tianjin, which contains information feedback that governs interactions in the system and is capable of synthesizing component-level knowledge into system behavior simulation at an integrated level, thus presenting reasonable predictive results for policy-making on water resources allocation and management. As for the Tianjin city, interactions among 96 components for 12 years are explored and four planning alternatives are chosen, one of which is based on the conventional mode assuming that the existing pattern of human activities will be prevailed, while the others are alternative planning designs based on the interaction of local authorities and planning researchers. Optimal mode is therefore obtained according to different scenarios when compared the simulation results for evaluation of different decisions and dynamic consequences.

  8. Cue-based decision making. A new framework for understanding the uninvolved food consumer.

    PubMed

    Hamlin, Robert P

    2010-08-01

    This article examines the processes that occur within the consumer's head as they make a choice between alternative market offers at a low level of involvement. It discusses recent research that indicates that the Theory of Planned Behaviour and its derivatives have restricted validity as a predictor of food consumers' evaluations and purchase patterns. This has significant implications as Planned Behaviour is the dominant paradigm within food industry research. The article demonstrates that Planned Behaviour has acquired this status more by default than by proven merit. The specific reasons for the failure of Planned Behaviour are discussed. An alternative paradigm, Cue-Based Decision Making is developed from an existing literature, and is proposed as a basis for increasing our understanding of the uninvolved food consumer in order to predict and influence their behaviour. 2010 Elsevier Ltd. All rights reserved.

  9. Alternative futures for Borneo show the value of integrating economic and conservation targets across borders

    PubMed Central

    Runting, Rebecca K.; Meijaard, Erik; Abram, Nicola K.; Wells, Jessie A.; Gaveau, David L.A.; Ancrenaz, Marc; Posssingham, Hugh P.; Wich, Serge A.; Ardiansyah, Fitrian; Gumal, Melvin T.; Ambu, Laurentius N.; Wilson, Kerrie A.

    2015-01-01

    Balancing economic development with international commitments to protect biodiversity is a global challenge. Achieving this balance requires an understanding of the possible consequences of alternative future scenarios for a range of stakeholders. We employ an integrated economic and environmental planning approach to evaluate four alternative futures for the mega-diverse island of Borneo. We show what could be achieved if the three national jurisdictions of Borneo coordinate efforts to achieve their public policy targets and allow a partial reallocation of planned land uses. We reveal the potential for Borneo to simultaneously retain ∼50% of its land as forests, protect adequate habitat for the Bornean orangutan (Pongo pygmaeus) and Bornean elephant (Elephas maximus borneensis), and achieve an opportunity cost saving of over US$43 billion. Such coordination would depend on enhanced information sharing and reforms to land-use planning, which could be supported by the increasingly international nature of economies and conservation efforts. PMID:25871635

  10. Express bus-fringe parking planning methodology.

    DOT National Transportation Integrated Search

    1975-01-01

    The conception, calibration, and evaluation of alternative disaggregate behavioral models of the express bus-fringe parking travel choice situation are described. Survey data collected for the Parham Express Service in Richmond, Virginia, are used to...

  11. Structured Analysis and Structured Design for the Logistic Support Analysis (LSA) Task 303 Evaluation of Alternatives and Trade-Off Analysis, LSA Subtask 303.2.2, Trade-Off Between Support System Alternatives and System/Equipment Alternatives

    DTIC Science & Technology

    1991-01-01

    Field 3. Training and Training Devices: a. Factory training b. Instructor and key personnel training c. New equipment training plan d. New equipment...12345678901234567990123456789012345678901234567890123456789� 1. 0016 10 SUPPOR2AILITY ALTEIIIVE TRADE-OFF ANALISIS . 4. + 4" + 4. 4. 4 2. C1.0 111.0 N2.0 1.0 INITIATE

  12. Metropolitan Washington Area Water Supply Study. Appendix H. Bloomington Lake Reformulation Study. Volume 1.

    DTIC Science & Technology

    1983-09-01

    Profile H-16 North Branch Potomac River H-16 Location H-16 Land Use H-16 Socio -Economic Characteristics H-I8 Archaeological and Historic Resources H- 19...pasture land. Socio - Economic Characteristics In general, the socio -economic characteristics of the North Branch Potomac River Basin are similar to...the formulation of alternative plans and to enable an evaluation of plan effectiveness. Planning objectives may sometimes conflict with each other

  13. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    PubMed

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  14. Alternative sample sizes for verification dose experiments and dose audits

    NASA Astrophysics Data System (ADS)

    Taylor, W. A.; Hansen, J. M.

    1999-01-01

    ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.

  15. 40 CFR 63.7752 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (3) Records of performance tests and performance evaluations as required by § 63.10(b)(2)(viii). (4... cores, the Material Data Safety Sheet or other documentation that provides the chemical composition of... evaluation plan as required in § 63.8(d)(3). (3) Request for alternatives to relative accuracy tests for CEMS...

  16. F-35 Pollution Prevention Activities

    DTIC Science & Technology

    2008-02-26

    Cover Page Bushing Replacement Lab Testing • F-35 Evaluation of Alternative Materials – ToughMet, Nitronic 50 /60, 304/HBN, SBIR Developed, etc...Completed SCC and Salt Fog exposure – All F-35 Bushings ɚ.5”Ø Switched to Cold Worked Nitronic 60 – Phase 5 test plan Evaluating Installation Issues • ASC

  17. Stage III Detailed Project Report and Environmental Impact Statement, Conesus Lake, New York.

    DTIC Science & Technology

    1981-09-01

    would have on the fish population. Based on Corps studies, it was concluded that there may be some impact and that the plan may lead to improved ...are based on Lhe 30-60 plan of improvement to the outlet control works. A1.7.6 Lake Target Rule Curves - Flood Control Evaluation To evaluate the...effect of rversinq many of the effects noted in the no-action alternative r(sult inq in high tax revenues ( based on high values), improvement i i (It

  18. Corrective Action Decision Document for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Rev. No. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Boehlecke

    2004-04-01

    The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less

  19. 12 strategies for managing capital projects.

    PubMed

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods.

  20. Director, Operational Test and Evaluation FY 2014 Annual Report

    DTIC Science & Technology

    2015-01-01

    Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014

  1. 78 FR 69127 - Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ..., the NPS undertook an evaluative process to consider a number of management actions that could be... decision-making. Both alternatives would employ a collaborative research and monitoring program (10-year...

  2. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  3. Study of Fallout Shelter Ventilation Kit Placement Design

    DTIC Science & Technology

    1980-05-01

    all this Rop.def APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED 17. DISTRSIGUTION STATEMENT (of the obol,atel ".r, sdg ~n Block 20, It 4lforI9...plans Kfor each shelter facility in that host area have been completed. ~In addition, alternative systems for distributing shelter supplies from the...alternative systems for distributing shelter supplies from Jthe host-area county seat to individual shelter faciiities were evaluated. Analysis of

  4. Theoretical orientations in environmental planning: An inquiry into alternative approaches

    NASA Astrophysics Data System (ADS)

    Briassoulis, Helen

    1989-07-01

    In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.

  5. Off-line robot programming and graphical verification of path planning

    NASA Technical Reports Server (NTRS)

    Tonkay, Gregory L.

    1989-01-01

    The objective of this project was to develop or specify an integrated environment for off-line programming, graphical path verification, and debugging for robotic systems. Two alternatives were compared. The first was the integration of the ASEA Off-line Programming package with ROBSIM, a robotic simulation program. The second alternative was the purchase of the commercial product IGRIP. The needs of the RADL (Robotics Applications Development Laboratory) were explored and the alternatives were evaluated based on these needs. As a result, IGRIP was proposed as the best solution to the problem.

  6. Simplification and Saving

    PubMed Central

    Beshears, John; Choi, James J.; Laibson, David; Madrian, Brigitte C.

    2012-01-01

    The daunting complexity of important financial decisions can lead to procrastination. We evaluate a low-cost intervention that substantially simplifies the retirement savings plan participation decision. Individuals received an opportunity to enroll in a retirement savings plan at a pre-selected contribution rate and asset allocation, allowing them to collapse a multidimensional problem into a binary choice between the status quo and the pre-selected alternative. The intervention increases plan enrollment rates by 10 to 20 percentage points. We find that a similar intervention can be used to increase contribution rates among employees who are already participating in a savings plan. PMID:24443619

  7. A Typology of Alternative Compensation Plans

    ERIC Educational Resources Information Center

    Sailer, Robert Conrad

    2017-01-01

    This study created a typology of alternative teacher-compensation plans in use in Wisconsin as of the fall of 2015. Eight plan types were identified with defining, common, and unique components. Of 125 districts that reported alternative plans, the most prevalent reported type was a hybrid type that combined components. Hybrid plans were found to…

  8. Battling Arrow's Paradox to Discover Robust Water Management Alternatives

    NASA Astrophysics Data System (ADS)

    Kasprzyk, J. R.; Reed, P. M.; Hadka, D.

    2013-12-01

    This study explores whether or not Arrow's Impossibility Theorem, a theory of social choice, affects the formulation of water resources systems planning problems. The theorem discusses creating an aggregation function for voters choosing from more than three alternatives for society. The Impossibility Theorem is also called Arrow's Paradox, because when trying to add more voters, a single individual's preference will dictate the optimal group decision. In the context of water resources planning, our study is motivated by recent theoretical work that has generalized the insights for Arrow's Paradox to the design of complex engineered systems. In this framing of the paradox, states of society are equivalent to water planning or design alternatives, and the voters are equivalent to multiple planning objectives (e.g. minimizing cost or maximizing performance). Seen from this point of view, multi-objective water planning problems are functionally equivalent to the social choice problem described above. Traditional solutions to such multi-objective problems aggregate multiple performance measures into a single mathematical objective. The Theorem implies that a subset of performance concerns will inadvertently dictate the overall design evaluations in unpredictable ways using such an aggregation. We suggest that instead of aggregation, an explicit many-objective approach to water planning can help overcome the challenges posed by Arrow's Paradox. Many-objective planning explicitly disaggregates measures of performance while supporting the discovery of the planning tradeoffs, employing multiobjective evolutionary algorithms (MOEAs) to find solutions. Using MOEA-based search to address Arrow's Paradox requires that the MOEAs perform robustly with increasing problem complexity, such as adding additional objectives and/or decisions. This study uses comprehensive diagnostic evaluation of MOEA search performance across multiple problem formulations (both aggregated and many-objective) to show whether or not aggregating performance measures biases decision making. In this study, we explore this hypothesis using an urban water portfolio management case study in the Lower Rio Grande Valley. The diagnostic analysis shows that modern self-adaptive MOEA search is efficient, effective, and reliable for the more complex many-objective LRGV planning formulations. Results indicate that although many classical water systems planning frameworks seek to account for multiple objectives, the common practice of reducing the problem into one or more highly aggregated performance measures can severely and negatively bias planning decisions.

  9. OPTIMIZING BMP PLACEMENT AT WATERSHED-SCALE USING SUSTAIN

    EPA Science Inventory

    Watershed and stormwater managers need modeling tools to evaluate alternative plans for environmental quality restoration and protection needs in urban and developing areas. A watershed-scale decision-support system, based on cost optimization, provides an essential tool to suppo...

  10. U.S. EPA's Watershed Management Research Activities

    EPA Science Inventory

    Watershed and stormwater managers need modeling tools to evaluate alternative plans for environmental quality restoration and protection needs in urban and developing areas. A watershed-scale decision-support system, based on cost optimization, provides an essential tool to suppo...

  11. Use of advanced analysis tools to support freeway corridor freight planning.

    DOT National Transportation Integrated Search

    2010-07-22

    Advanced corridor freight management and pricing strategies are increasingly being chosen to : address freight mobility challenges. As a result, evaluation tools are needed to assess the benefits : of these strategies as compared to other alternative...

  12. Evaluating forest management policies by parametric linear programing

    Treesearch

    Daniel I. Navon; Richard J. McConnen

    1967-01-01

    An analytical and simulation technique, parametric linear programing explores alternative conditions and devises an optimal management plan for each condition. Its application in solving policy-decision problems in the management of forest lands is illustrated in an example.

  13. A dosimetric analysis of intensity-modulated radiation therapy (IMRT) as an alternative to adjuvant high-dose-rate (HDR) brachytherapy in early endometrial cancer patients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aydogan, Bulent; Mundt, Arno J.; Department of Radiation Oncology, University of Illinois at Chicago, Chicago, IL

    2006-05-01

    Purpose: To evaluate the role of intensity-modulated radiation treatment (IMRT) as an alternative to high-dose-rate (HDR) brachytherapy in the treatment of the vagina in postoperative early endometrial cancer patients after surgery. Methods and Materials: Planning computed tomography (CT) scans of 10 patients previously treated with HDR were used in this study. In all cases, a dose of 700 cGy/fraction was prescribed at a distance of 0.5 cm from the cylinder surface. The same CT scans were then used in IMRT planning. In this paradigm, the vaginal cylinder represents a component of a hypothetical immobilization system that would be indexed tomore » the linac treatment table. Results: Our study showed that IMRT provided relatively lower rectal doses than HDR when treatment was prescribed at a distance of 0.5 cm away from the cylinder surface. Maximum rectal doses were lower with IMRT compared with HDR (average: 89.0% vs. 142.6%, respectively, p < 0.05). Moreover, the mean rectal dose was lower in IMRT plans compared with HDR plans with treatment prescribed either to the surface (average: 14.8% vs. 21.4%, respectively, p < 0.05) or to 0.5 cm (average: 19.6% vs. 33.5%, respectively, p < 0.05). IMRT plans had planning target volume (PTV) coverage comparable with HDR (average PTV minimum for treatment prescribed to 0.5 cm: 93.9% vs. 92.1%, p = 0.71, respectively) with less inhomogeneity (average PTV maximum: 110.8% vs. 381.6%, p < 0.05). Conclusion: Our dosimetric analysis suggests that when used in conjunction with a suitable immobilization system, IMRT may provide an alternative to HDR brachytherapy in women with early endometrial cancer after hysterectomy. However, more studies are needed to evaluate the clinical merit of the IMRT in these patients.« less

  14. Evaluation of ERTS-1 data for acquiring land use data of northern Megalopolis. [New England

    NASA Technical Reports Server (NTRS)

    Simpson, R. B.; Lindgren, D. T.; Goldstein, W. D.

    1974-01-01

    State planners are increasingly becoming interested in ERTS as a possible method for acquiring land use data. An important consideration to them is whether ERTS can provide such data at a savings in both time and money over alternative systems. A preliminary evaluation of ERTS as a planning tool is given.

  15. Multiple Alternatives for Educational Evaluation and Decision-Making. Interim Draft. Paper and Report Series No. 72.

    ERIC Educational Resources Information Center

    Wholeben, Brent E.

    This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…

  16. Reliability of Radioisotope Stirling Convertor Linear Alternator

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin; Korovaichuk, Igor; Geng, Steven M.; Schreiber, Jeffrey G.

    2006-01-01

    Onboard radioisotope power systems being developed and planned for NASA s deep-space missions would require reliable design lifetimes of up to 14 years. Critical components and materials of Stirling convertors have been undergoing extensive testing and evaluation in support of a reliable performance for the specified life span. Of significant importance to the successful development of the Stirling convertor is the design of a lightweight and highly efficient linear alternator. Alternator performance could vary due to small deviations in the permanent magnet properties, operating temperature, and component geometries. Durability prediction and reliability of the alternator may be affected by these deviations from nominal design conditions. Therefore, it is important to evaluate the effect of these uncertainties in predicting the reliability of the linear alternator performance. This paper presents a study in which a reliability-based methodology is used to assess alternator performance. The response surface characterizing the induced open-circuit voltage performance is constructed using 3-D finite element magnetic analysis. Fast probability integration method is used to determine the probability of the desired performance and its sensitivity to the alternator design parameters.

  17. 10 CFR 905.15 - What are the requirements for the small customer plan alternative?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...

  18. 10 CFR 905.15 - What are the requirements for the small customer plan alternative?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...

  19. 10 CFR 905.15 - What are the requirements for the small customer plan alternative?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...

  20. Developing the plan

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The basic sequence in the planning development process is discussed. Alternative ways of satisfying estimated needs, and the selection of an alternative are described along with the development of a plan to implement the selected alternative.

  1. 10 CFR 490.203 - Light Duty Alternative Fueled Vehicle Plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Light Duty Alternative Fueled Vehicle Plan. 490.203 Section 490.203 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.203 Light Duty Alternative Fueled Vehicle Plan. (a) General Provisions...

  2. 10 CFR 490.203 - Light Duty Alternative Fueled Vehicle Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Light Duty Alternative Fueled Vehicle Plan. 490.203 Section 490.203 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.203 Light Duty Alternative Fueled Vehicle Plan. (a) General Provisions...

  3. 10 CFR 490.203 - Light Duty Alternative Fueled Vehicle Plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Light Duty Alternative Fueled Vehicle Plan. 490.203 Section 490.203 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.203 Light Duty Alternative Fueled Vehicle Plan. (a) General Provisions...

  4. 10 CFR 490.203 - Light Duty Alternative Fueled Vehicle Plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Light Duty Alternative Fueled Vehicle Plan. 490.203 Section 490.203 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.203 Light Duty Alternative Fueled Vehicle Plan. (a) General Provisions...

  5. 10 CFR 490.203 - Light Duty Alternative Fueled Vehicle Plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Light Duty Alternative Fueled Vehicle Plan. 490.203 Section 490.203 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.203 Light Duty Alternative Fueled Vehicle Plan. (a) General Provisions...

  6. 75 FR 44968 - Office of the Secretary, Office of the Assistant Secretary for Planning and Evaluation; Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Trustees) establish a panel of technical experts to review the methods used in the HI and SMI annual... care, and alternate projection methodologies. The panel may also examine other methodological issues...

  7. Boston Harbor National Park Service sites : alternative transportation systems evaluation report

    DOT National Transportation Integrated Search

    2001-06-01

    This project puts forth a forward looking water-based transportation plan which would serve four NPS units in and around Boston Harbor: Boston Harbor Islands National Recreation Area, Boston National Historical Park, Salem Maritime Historic Site, and...

  8. A Watershed-scale Design Optimization Model for Stormwater Best Management Practices

    EPA Science Inventory

    U.S. Environmental Protection Agency developed a decision-support system, System for Urban Stormwater Treatment and Analysis Integration (SUSTAIN), to evaluate alternative plans for stormwater quality management and flow abatement techniques in urban and developing areas. SUSTAI...

  9. The Next Step: Managing Your District's Technology Operations.

    ERIC Educational Resources Information Center

    Pereus, Stephen C.

    2001-01-01

    Discusses benefits and especially risks involved with educational technology: unexpected costs; possible negative effects on student achievement; legal, ethical, and security issues; and resistance to change. Success ensues from providing leadership and vision, updating technology planning, evaluating alternatives, setting standards, involving…

  10. Timber sale planning and analysis system: A user`s guide to the TSPAS sale program. Forest Service general technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schuster, E.G.; Jones, J.G.; Meacham, M.L.

    1995-08-01

    Presents a guide to operation and interpretation of TSPAS Sale Program (TSPAS SP), a menu-driven computer program that is one of two programs in the Timber Sale Planning and Analysis System. TSPAS SP is intended to help field teams design and evaluate timber sale alternatives. TSPAS SP evaluate current and long-term timber implications along with associated nontimber outputs. Features include multiple entries and products, real value change, and graphical input. Guide includes user instructions, a glossary, a listing of data needs, and an explanation of error messages.

  11. Water management in Egypt for facing the future challenges

    PubMed Central

    Omar, Mohie El Din M.; Moussa, Ahmed M.A.

    2016-01-01

    The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025. PMID:27222745

  12. Water management in Egypt for facing the future challenges.

    PubMed

    Omar, Mohie El Din M; Moussa, Ahmed M A

    2016-05-01

    The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025.

  13. Cost-Benefit Analysis for Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2007-01-01

    NASA and Air Force Space Command (AFSPC) have similar missions and therefore similar facilities and structures in similar environments. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. The most common topcoats used in coating systems are polyurethanes that contain isocyanates. Isocyanates are classified as potential human carcinogens and are known to cause cancer in animals. The primary objective of this effort was to demonstrate and validate alternatives to aliphatic isocyanate polyurethanes resulting in one or more isocyanate-free coatings qualified for use at AFSPC and NASA installations participating in this project. This Cost-Benefit Analysis (CBA) quantifies the estimated capital and process costs of coating alternatives and cost savings relative to the current coatings. The estimates in this CBA are to be used for assessing the relative merits of the selected alternatives. The actual economic effects at any specific facility will depend on the alternative material or technology implemented, the number of actual applications converted, future workloads, and other factors . The participants initially considered eighteen (18) alternative coatings as described in the Potential Alternatives Report entitled Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB. Of those, 8 alternatives were selected for testing in accordance with the Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, and the Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives 10 Aliphatic Isocyanate Polyurethanes, both of which were prepared by ITB. A joint Test Report entitled Joint Test Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, prepared by ITB, documents the results of the laboratory and field testing, as well as any test modifications made during the execution of the testing. The coatings selected for evaluation in this CBA are shown in the table below. Only one control coating system is considered in this analysis. These coatings were either downselected for Phase II or performed well enough to be included in the Qualified Products List in the NASA technical standard NASA-STD-5008, Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment.

  14. Identifying and Evaluating Options for Improving Sediment Management and Fish Passage at Hydropower Dams in the Lower Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Wild, T. B.; Reed, P. M.; Loucks, D. P.

    2015-12-01

    The Mekong River basin in Southeast Asia is undergoing intensive and pervasive hydropower development to satisfy demand for increased energy and income to support its growing population of 60 million people. Just 20 years ago this river flowed freely. Today some 30 large dams exist in the basin, and over 100 more are being planned for construction. These dams will alter the river's natural water, sediment and nutrient flows, thereby impacting river morphology and ecosystems, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most valuable and productive freshwater fish habitats. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to potentially achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and fish passage. We introduce examples of such alternative SDO opportunities for Sambor Dam in Cambodia, planned to be constructed on the main stem of the Mekong River. To evaluate the performance of such alternatives, we developed a Python-based simulation tool called PySedSim. PySedSim is a daily time step mass balance model that identifies the relative tradeoffs among hydropower production, and flow and sediment regime alteration, associated with reservoir sediment management techniques such as flushing, sluicing, bypassing, density current venting and dredging. To date, there has been a very limited acknowledgement or evaluation of the significant uncertainties that impact the evaluation of SDO alternatives. This research is formalizing a model diagnostic assessment of the key assumptions and parametric uncertainties that strongly influence PySedSim SDO evaluations. Using stochastic hydrology and sediment load data, our diagnostic assessment evaluates and compares several Sambor Dam alternatives using several performance measures related to energy production, sediment trapping and regime alteration, and fish passage. We show that performance of the alternatives can be highly variable, and conduct a simultaneous multi-parameter factor screening sensitivity analysis to identify the subset of PySedSim model parameters that contribute most significantly to performance uncertainties in attempts to identify the more robust options.

  15. Raising Students' Perception of the Relevance of Science Teaching and Promoting Communication and Evaluation Capabilities Using Authentic and Controversial Socio-Scientific Issues in the Framework of Climate Change

    ERIC Educational Resources Information Center

    Feierabend, Timo; Eilks, Ingo

    2010-01-01

    This paper describes the development of different lesson plans dealing with authentic and controversial socio-scientific issues in the framework of climate change. These lesson plans orient themselves along the socio-critical, problem-oriented approach to science teaching. They deal with the use of bioethanol as an alternative fuel and with the…

  16. Consider Workplace Needs When Purchasing Office Furniture.

    ERIC Educational Resources Information Center

    Burton, Bob

    1999-01-01

    Examines furniture-buying tips, involving workplace-needs assessment, that can help make the organization's workplace more effective. Stresses the importance of planning, tying the furniture purchasing into the strategic business, considering alternatives to furniture ownership, evaluating employee health and safety, and understanding any added…

  17. A RETROSPECTIVE ANALYSIS OF MODEL UNCERTAINTY FOR FORECASTING HYDROLOGIC CHANGE

    EPA Science Inventory

    GIS-based hydrologic modeling offers a convenient means of assessing the impacts associated with land-cover/use change for environmental planning efforts. Alternative future scenarios can be used as input to hydrologic models and compared with existing conditions to evaluate pot...

  18. Evaluation of catch basin grates : final report.

    DOT National Transportation Integrated Search

    1972-10-01

    The Louisiana Department of Highways has adopted new designs for the Standard Plans for the RCB 22X catch basin to replace the old standard cast iron grate with either a welded bar steel grate or an alternate riveted steel reticuline grate. This revi...

  19. Applying Behavioral Ecology and Behavioral Economics to Conservation and Development Planning: An Example from the Mikea Forest, Madagascar.

    PubMed

    Tucker, Bram

    2007-09-01

    Governments and non-govermental organizations (NGOs) that plan projects to conserve the environment and alleviate poverty often attempt to modify rural livelihoods by halting activities they judge to be destructive or inefficient and encouraging alternatives. Project planners typically do so without understanding how rural people themselves judge the value of their activities. When the alternatives planners recommend do not replace the value of banned activities, alternatives are unlikely to be adopted, and local people will refuse to participate. Human behavioral ecology and behavioral economics may provide useful tools for generating and evaluating hypotheses for how people value economic activities in their portfolios and potential alternatives. This is demonstrated with a case example from southwestern Madagascar, where plans to create a Mikea Forest National Park began with the elimination of slash-and-burn maize agriculture and the encouragement to plant labor-intensive manioc instead. Future park plans could restrict access to wild tuber patches, hunting small game, and fishing. The value of these activities is considered using observational data informed by optimal foraging theory, and experimental data describing people's time preference and covariation perception. Analyses suggest that manioc is not a suitable replacement for maize for many Mikea because the two crops differ in terms of labor requirements, delay-to-reward, and covariation with rainfall. Park planners should promote wild tuber foraging and stewardship of tuber patches and the anthropogenic landscapes in which they are found. To conserve small game, planners must provide alternative sources of protein and cash. Little effort should be spent protecting lemurs, as they are rarely eaten and never sold.

  20. Coal gasification systems engineering and analysis, volume 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

  1. Hunters' acceptability of the surveillance system and alternative surveillance strategies for classical swine fever in wild boar - a participatory approach.

    PubMed

    Schulz, Katja; Calba, Clémentine; Peyre, Marisa; Staubach, Christoph; Conraths, Franz J

    2016-09-06

    Surveillance measures can only be effective if key players in the system accept them. Acceptability, which describes the willingness of persons to contribute, is often analyzed using participatory methods. Participatory epidemiology enables the active involvement of key players in the assessment of epidemiological issues. In the present study, we used a participatory method recently developed by CIRAD (Centre de Coopération Internationale en Recherche Agronomique pour le Développement) to evaluate the functionality and acceptability of Classical Swine Fever (CSF) surveillance in wild boar in Germany, which is highly dependent on the participation of hunters. The acceptability of alternative surveillance strategies was also analyzed. By conducting focus group discussions, potential vulnerabilities in the system were detected and feasible alternative surveillance strategies identified. Trust in the current surveillance system is high, whereas the acceptability of the operation of the system is medium. Analysis of the acceptability of alternative surveillance strategies showed how risk-based surveillance approaches can be combined to develop strategies that have sufficient support and functionality. Furthermore, some surveillance strategies were clearly rejected by the hunters. Thus, the implementation of such strategies may be difficult. Participatory methods can be used to evaluate the functionality and acceptability of existing surveillance plans for CSF among hunters and to optimize plans regarding their chances of successful implementation.

  2. Evaluation of alternatives for best available technology treatment and retreatment of uranium-contaminated solutions at the Paducah Gaseous Diffusion Plant C-400 Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Cul, G.D.

    1991-02-01

    The Paducah Gaseous Diffusion Plant C-400 Decontamination Facility generators aqueous solutions that originate in drum washing, machine parts and equipment cleaning, and other decontamination processes. In general, the waste contains uranyl, fluoride, carbonate, and nitrate ions, in addition to soaps, detergents, secondary contaminants, and particulate matter. The main contaminants are fluoride, technetium, uranium, and other heavy metals. In accordance with Department of Energy (DOE) Order 5400.5, the releases of radioactive materials must be as low as reasonably achievable and be below the derived concentration guide limits. To comply with the DOE order, an action plan was formulated. The action planmore » included a literature search to support best available technology evaluation of treatment alternatives, a quality assurance/quality control plan, suggestion of alternative treatment options, bench-scale test studies of the proposed treatment alternatives, and establishment of the final recommendation. Five major technologies were considered: precipitation/coprecipitation, reverse osmosis, ultrafiltration, supported liquid membranes, and ion exchange. Biosorption was also briefly considered. Based on C-400's requirements and facilities, the precipitation/coprecipitation process appears to be the best suited for use at the plant. Four different treatment options using the precipitation/coprecipitation technology were proposed. Bench-scale studies of all four options were suggested. Options 1 and 2 represent a combination of lime-softening and iron coprecipitation. Laboratory test evaluations were initiated and the results involving Options 1 and 2 reported here. 29 refs., 1 fig., 2 tabs.« less

  3. Alternative Fuels Data Center: City of Cincinnati Turns Sustainable Fleet

    Science.gov Websites

    Plan into On-Road Reality City of Cincinnati Turns Sustainable Fleet Plan into On-Road Reality Plan into On-Road Reality on Facebook Tweet about Alternative Fuels Data Center: City of Cincinnati Turns Sustainable Fleet Plan into On-Road Reality on Twitter Bookmark Alternative Fuels Data Center

  4. A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji

    Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.

  5. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less

  6. 49 CFR Attachment 1 - Form and Content of Statement

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  7. 49 CFR Attachment 1 - Form and Content of Statement

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  8. 7 CFR 650.5 - Environmental evaluation in planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...

  9. 7 CFR 650.5 - Environmental evaluation in planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...

  10. 7 CFR 650.5 - Environmental evaluation in planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...

  11. 7 CFR 650.5 - Environmental evaluation in planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... action; (40 CFR 1502.14). In NRCS-assisted project actions, nonstructural, water conservation, and other alternatives that are in keeping with the Water Resources Council's Principles and Standards are considered, if... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES COMPLIANCE WITH NEPA Procedures for NRCS...

  12. Review and evaluation of models that produce trip tables from ground counts : interim report.

    DOT National Transportation Integrated Search

    1996-01-01

    This research effort was motivated by the desires of planning agencies to seek alternative methods of deriving current or base year Origin-Destination (O-D) trip tables without adopting conventional O-D surveys that are expensive, time consuming and ...

  13. Assessing agreement among alternative climate change projections to inform conservation recommendations in the contiguous United States.

    PubMed

    Belote, R Travis; Carroll, Carlos; Martinuzzi, Sebastián; Michalak, Julia; Williams, John W; Williamson, Matthew A; Aplet, Gregory H

    2018-06-21

    Addressing uncertainties in climate vulnerability remains a challenge for conservation planning. We evaluate how confidence in conservation recommendations may change with agreement among alternative climate projections and metrics of climate exposure. We assessed agreement among three multivariate estimates of climate exposure (forward velocity, backward velocity, and climate dissimilarity) using 18 alternative climate projections for the contiguous United States. For each metric, we classified maps into quartiles for each alternative climate projections, and calculated the frequency of quartiles assigned for each gridded location (high quartile frequency = more agreement among climate projections). We evaluated recommendations using a recent climate adaptation heuristic framework that recommends emphasizing various conservation strategies to land based on current conservation value and expected climate exposure. We found that areas where conservation strategies would be confidently assigned based on high agreement among climate projections varied substantially across regions. In general, there was more agreement in forward and backward velocity estimates among alternative projections than agreement in estimates of local dissimilarity. Consensus of climate predictions resulted in the same conservation recommendation assignments in a few areas, but patterns varied by climate exposure metric. This work demonstrates an approach for explicitly evaluating alternative predictions in geographic patterns of climate change.

  14. Satellite Power Systems (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1978-01-01

    A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.

  15. Multi-Criteria Decision Making for a Spatial Decision Support System on the Analysis of Changing Risk

    NASA Astrophysics Data System (ADS)

    Olyazadeh, Roya; van Westen, Cees; Bakker, Wim H.; Aye, Zar Chi; Jaboyedoff, Michel; Derron, Marc-Henri

    2014-05-01

    Natural hazard risk management requires decision making in several stages. Decision making on alternatives for risk reduction planning starts with an intelligence phase for recognition of the decision problems and identifying the objectives. Development of the alternatives and assigning the variable by decision makers to each alternative are employed to the design phase. Final phase evaluates the optimal choice by comparing the alternatives, defining indicators, assigning a weight to each and ranking them. This process is referred to as Multi-Criteria Decision Making analysis (MCDM), Multi-Criteria Evaluation (MCE) or Multi-Criteria Analysis (MCA). In the framework of the ongoing 7th Framework Program "CHANGES" (2011-2014, Grant Agreement No. 263953) of the European Commission, a Spatial Decision Support System is under development, that has the aim to analyse changes in hydro-meteorological risk and provide support to selecting the best risk reduction alternative. This paper describes the module for Multi-Criteria Decision Making analysis (MCDM) that incorporates monetary and non-monetary criteria in the analysis of the optimal alternative. The MCDM module consists of several components. The first step is to define criteria (or Indicators) which are subdivided into disadvantages (criteria that indicate the difficulty for implementing the risk reduction strategy, also referred to as Costs) and advantages (criteria that indicate the favorability, also referred to as benefits). In the next step the stakeholders can use the developed web-based tool for prioritizing criteria and decision matrix. Public participation plays a role in decision making and this is also planned through the use of a mobile web-version where the general local public can indicate their agreement on the proposed alternatives. The application is being tested through a case study related to risk reduction of a mountainous valley in the Alps affected by flooding. Four alternatives are evaluated in this case study namely: construction of defense structures, relocation, implementation of an early warning system and spatial planning regulations. Some of the criteria are determined partly in other modules of the CHANGES SDSS, such as the costs for implementation, the risk reduction in monetary values, and societal risk. Other criteria, which could be environmental, economic, cultural, perception in nature, are defined by different stakeholders such as local authorities, expert organizations, private sector, and local public. In the next step, the stakeholders weight the importance of the criteria by pairwise comparison and visualize the decision matrix, which is a matrix based on criteria versus alternatives values. Finally alternatives are ranked by Analytic Hierarchy Process (AHP) method. We expect that this approach will help the decision makers to ease their works and reduce their costs, because the process is more transparent, more accurate and involves a group decision. In that way there will be more confidence in the overall decision making process. Keywords: MCDM, Analytic Hierarchy Process (AHP), SDSS, Natural Hazard Risk Management

  16. A School Finance Computer Simulation Model

    ERIC Educational Resources Information Center

    Boardman, Gerald R.

    1974-01-01

    Presents a description of the computer simulation model developed by the National Educational Finance Project for use by States in planning and evaluating alternative approaches for State support programs. Provides a general introduction to the model, a program operation overview, a sample run, and some conclusions. (Author/WM)

  17. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  18. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  19. 49 CFR 520.34 - Comments on environmental statements prepared by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  20. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  1. 49 CFR 520.34 - Comments on environmental statements prepared by other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  2. A Knowledge Use Perspective: Comments on a Conference.

    ERIC Educational Resources Information Center

    Fisher, Evelyn

    The papers from the 1982 conference on Pennsylvania's Long Range Plan for School Improvement (LRPSI) assist in constructing reality about LRPSI itself. Focusing on the program's registration phase, Charles Gorman offers an alternative proposal, linking registration and evaluation, that would contribute to improving schools and increasing public…

  3. Unique challenges facing Southwestern tribes: Chapter 17

    USGS Publications Warehouse

    Hiza, Margaret; Chief, Karletta; Bemis, Kirk; Gautam, Mahesh; Middleton, Beth Rose; Tsosie, Rebecca

    2013-01-01

    •\tTribes are taking action to address climate change by instituting climate-change mitigation initiatives, including utility-scale, alternative-energy projects, and energy-conservation projects. Tribes are also evaluating their existing capacity to engage in effective adaptation planning, even though financial and social capital is limited.

  4. HYDROLOGIC MODEL UNCERTAINTY ASSOCIATED WITH SIMULATING FUTURE LAND-COVER/USE SCENARIOS: A RETROSPECTIVE ANALYSIS

    EPA Science Inventory

    GIS-based hydrologic modeling offers a convenient means of assessing the impacts associated with land-cover/use change for environmental planning efforts. Alternative future scenarios can be used as input to hydrologic models and compared with existing conditions to evaluate pot...

  5. Automated dredging and disposal alternatives management system (ADDAMS). Environmental effects of dredging. Technical note

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This technical note describes the current capabilities and availability of the Automated Dredging and Disposal Alternatives Management System (ADDAMS). The technical note replaces the earlier Technical Note EEDP-06-12, which should be discarded. Planning, design, and management of dredging and dredged material disposal projects often require complex or tedious calculations or involve complex decision-making criteria. In addition, the evaluations often must be done for several disposal alternatives or disposal sites. ADDAMS is a personal computer (PC)-based system developed to assist in making such evaluations in a timely manner. ADDAMS contains a collection of computer programs (applications) designed to assist in managingmore » dredging projects. This technical note describes the system, currently available applications, mechanisms for acquiring and running the system, and provisions for revision and expansion.« less

  6. 30 CFR 75.1507 - Emergency Response Plan; refuge alternatives.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....1507 Emergency Response Plan; refuge alternatives. (a) The Emergency Response Plan (ERP) shall include... request and the District Manager may approve an alternative location in the ERP if mining involves two... constructed prior to an event in a secure space and an isolated atmosphere, the ERP shall specify that— (1...

  7. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  8. 33 CFR 155.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate... familiar with the implementation of the vessel response plan; and (4) Be trained in the responsibilities of...

  9. 33 CFR 155.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate... familiar with the implementation of the vessel response plan; and (4) Be trained in the responsibilities of...

  10. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  11. 33 CFR 155.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate... familiar with the implementation of the vessel response plan; and (4) Be trained in the responsibilities of...

  12. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  13. 33 CFR 155.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate... familiar with the implementation of the vessel response plan; and (4) Be trained in the responsibilities of...

  14. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... BULK Response Plans for Oil Facilities § 154.1026 Qualified individual and alternate qualified individual. (a) The response plan must identify a qualified individual and at least one alternate who meet... implementation of the facility response plan; and (4) Be trained in the responsibilities of the qualified...

  15. Decision making in high-velocity environments: implications for healthcare.

    PubMed

    Stepanovich, P L; Uhrig, J D

    1999-01-01

    Healthcare can be considered a high-velocity environment and, as such, can benefit from research conducted in other industries regarding strategic decision making. Strategic planning is not only relevant to firms in high-velocity environments, but is also important for high performance and survival. Specifically, decision-making speed seems to be instrumental in differentiating between high and low performers; fast decision makers outperform slow decision makers. This article outlines the differences between fast and slow decision makers, identifies five paralyses that can slow decision making in healthcare, and outlines the role of a planning department in circumventing these paralyses. Executives can use the proposed planning structure to improve both the speed and quality of strategic decisions. The structure uses planning facilitators to avoid the following five paralyses: 1. Analysis. Decision makers can no longer afford the luxury of lengthy, detailed analysis but must develop real-time systems that provide appropriate, timely information. 2. Alternatives. Many alternatives (beyond the traditional two or three) need to be considered and the alternatives must be evaluated simultaneously. 3. Group Think. Decision makers must avoid limited mind-sets and autocratic leadership styles by seeking out independent, knowledgeable counselors. 4. Process. Decision makers need to resolve conflicts through "consensus with qualification," as opposed to waiting for everyone to come on board. 5. Separation. Successful implementation requires a structured process that cuts across disciplines and levels.

  16. Interactive reconstructions of cranial 3D implants under MeVisLab as an alternative to commercial planning software.

    PubMed

    Egger, Jan; Gall, Markus; Tax, Alois; Ücal, Muammer; Zefferer, Ulrike; Li, Xing; von Campe, Gord; Schäfer, Ute; Schmalstieg, Dieter; Chen, Xiaojun

    2017-01-01

    In this publication, the interactive planning and reconstruction of cranial 3D Implants under the medical prototyping platform MeVisLab as alternative to commercial planning software is introduced. In doing so, a MeVisLab prototype consisting of a customized data-flow network and an own C++ module was set up. As a result, the Computer-Aided Design (CAD) software prototype guides a user through the whole workflow to generate an implant. Therefore, the workflow begins with loading and mirroring the patients head for an initial curvature of the implant. Then, the user can perform an additional Laplacian smoothing, followed by a Delaunay triangulation. The result is an aesthetic looking and well-fitting 3D implant, which can be stored in a CAD file format, e.g. STereoLithography (STL), for 3D printing. The 3D printed implant can finally be used for an in-depth pre-surgical evaluation or even as a real implant for the patient. In a nutshell, our research and development shows that a customized MeVisLab software prototype can be used as an alternative to complex commercial planning software, which may also not be available in every clinic. Finally, not to conform ourselves directly to available commercial software and look for other options that might improve the workflow.

  17. Interactive reconstructions of cranial 3D implants under MeVisLab as an alternative to commercial planning software

    PubMed Central

    Egger, Jan; Gall, Markus; Tax, Alois; Ücal, Muammer; Zefferer, Ulrike; Li, Xing; von Campe, Gord; Schäfer, Ute; Schmalstieg, Dieter; Chen, Xiaojun

    2017-01-01

    In this publication, the interactive planning and reconstruction of cranial 3D Implants under the medical prototyping platform MeVisLab as alternative to commercial planning software is introduced. In doing so, a MeVisLab prototype consisting of a customized data-flow network and an own C++ module was set up. As a result, the Computer-Aided Design (CAD) software prototype guides a user through the whole workflow to generate an implant. Therefore, the workflow begins with loading and mirroring the patients head for an initial curvature of the implant. Then, the user can perform an additional Laplacian smoothing, followed by a Delaunay triangulation. The result is an aesthetic looking and well-fitting 3D implant, which can be stored in a CAD file format, e.g. STereoLithography (STL), for 3D printing. The 3D printed implant can finally be used for an in-depth pre-surgical evaluation or even as a real implant for the patient. In a nutshell, our research and development shows that a customized MeVisLab software prototype can be used as an alternative to complex commercial planning software, which may also not be available in every clinic. Finally, not to conform ourselves directly to available commercial software and look for other options that might improve the workflow. PMID:28264062

  18. Economic viability of access broadband multiservice networks

    NASA Astrophysics Data System (ADS)

    Castelli, Francesco; Dammicco, Giacinto; Mocci, Ugo

    1995-02-01

    In this paper the economic viability of alternative architectures for optical access networks providing broad band services to different subscriber classes in a metropolitan environment, is investigated by a specific tool, NEVE (Network Economic Viability Evaluator), developed for broad band multiservice network planning, service evolutionary scenarios assessment, evaluation of tariff strategies and other actions taken at stimulating the demand growth. As the viability target can be achieved in different ways, different studies can be carried out by NEVE. In the paper some of them are discussed, particularly the ones addressed: to evaluate the impact on viability of alternative service scenarios; to determine the critical mass of broad band subscribers and the critical joint service adoption cost; to evaluate cross subsidiary policies among different subscriber classes and services; to perform sensitivity analysis with respect to variations of demand parameters and tariffs.

  19. Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

    NASA Technical Reports Server (NTRS)

    Hawthorne, E. I.

    1977-01-01

    Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

  20. The role of disease management in pay-for-performance programs for improving the care of chronically ill patients.

    PubMed

    Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A

    2006-02-01

    To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.

  1. 20 CFR 411.725 - If an alternate participant becomes an EN and it has signed employment plans, both as an...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false If an alternate participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how will SSA pay for... participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how...

  2. 20 CFR 411.725 - If an alternate participant becomes an EN and it has signed employment plans, both as an...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false If an alternate participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how will SSA pay for... participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how...

  3. 20 CFR 411.725 - If an alternate participant becomes an EN and it has signed employment plans, both as an...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false If an alternate participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how will SSA pay for... participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how...

  4. 20 CFR 411.725 - If an alternate participant becomes an EN and it has signed employment plans, both as an...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false If an alternate participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how will SSA pay for... participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how...

  5. 20 CFR 411.725 - If an alternate participant becomes an EN and it has signed employment plans, both as an...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false If an alternate participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how will SSA pay for... participant becomes an EN and it has signed employment plans, both as an alternate participant and an EN, how...

  6. Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. Strand

    The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  7. 75 FR 62845 - National Toxicology Program (NTP) Interagency Center for the Evaluation of Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... Eye Injuries and Chemically Induced Allergic Contact Dermatitis (ACD) AGENCY: National Institute of... Potential for Chemically Induced Allergic Contact Dermatitis,'' are planned for January 19 and 20, 2011... for Chemically Induced Allergic Contact Dermatitis'' will be held on January 20, 2011. Sessions for...

  8. SIMYAR: a cable-yarding simulation model.

    Treesearch

    R.J. McGaughey; R.H. Twito

    1987-01-01

    A skyline-logging simulation model designed to help planners evaluate potential yarding options and alternative harvest plans is presented. The model, called SIMYAR, uses information about the timber stand, yarding equipment, and unit geometry to estimate yarding co stand productivity for a particular operation. The costs of felling, bucking, loading, and hauling are...

  9. 78 FR 73518 - Notice Inviting Suggestions for New Experiments for the Experimental Sites Initiative; Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... ideas for new institutionally based experiments designed to test alternative ways of administering the... Secretary will design experiments and corresponding evaluation plans. The Secretary will subsequently... requirements. Many of these requirements are also designed to provide protections and safeguards to students...

  10. 49 CFR Appendix A to Part 611 - Description of Measures Used for Project Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Livable Communities initiatives and local economic activities; (5) Consideration of alternative land use... to fixed guideway systems and extensions may not be limited to a single project). (b) The stability and reliability of the proposed capital financing plan, according to: (i) The stability, reliability...

  11. 77 FR 18856 - Atchafalaya National Wildlife Refuge, LA; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... local, state, and regional newspapers, six online media outlets, and two local radio networks. Copies of... Atchafalaya; The Nature Conservancy; Gulf Restoration Network; Atchafalaya Basinkeeper; Louisiana Crawfish... Environmental Action Network; and local citizens. Selected Alternative The Draft CCP/EA identified and evaluated...

  12. 12 CFR Appendix B to Part 749 - Catastrophic Act Preparedness Guidelines

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... disaster. (1) A business impact analysis to evaluate potential threats; (2) A risk assessment to determine critical systems and necessary resources; (3) A written plan addressing: i. Persons with authority to enact... member services through identification of alternate operating location(s) or mediums to provide services...

  13. Evaluation of SWAT for estimating ET in irrigated and dryland cropping systems in the Texas High Plains

    USDA-ARS?s Scientific Manuscript database

    Hydrologic models such as SWAT are used extensively for predicting water availability and water quality responses to alternative management practices. Modeling results have been used by regulatory agencies for developing remedial measures for impaired water bodies and for water planning purposes. Ho...

  14. 48 CFR 1552.216-78 - Award term incentive plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... NIHCPS is an interactive database located on the Internet which EPA uses to record contractor performance... evaluation of performance, and, together with Agency need and availability of funding, serves as the basis.... Typically, the performance standards and AQLs will be defined in the QASP] (End of clause) Alternate 1 (FEB...

  15. 32 CFR 651.5 - Army policies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Acquisition Strategy as required by DOD 5000.2-R for all ACAT programs. Programmatic ESH evaluation is not a NEPA document. It is a planning, programming, and budgeting strategy into which the... selection of alternatives (40 CFR 1506.1). In accordance with DOD 5000.2.R, the MATDEV is responsible for...

  16. SUSTAIN – A Framework for Placement of Best Management Practices in Urban Watersheds to Protect Water Quality

    EPA Science Inventory

    Watershed and stormwater managers need modeling tools to evaluate alternative plans for water quality management and flow abatement techniques in urban and developing areas. A watershed-scale, decision-support framework that is based on cost optimization is needed to support gov...

  17. Simulating landscape catena effects in no-till dryland agroecosystems using GPFARM

    USDA-ARS?s Scientific Manuscript database

    Alternative agricultural management systems in the semi-arid Great Plains are receiving increasing attention. GPFARM is a farm/ranch decision support system (DSS) designed to assist in strategic management planning for land units from the field to the whole-farm level. This study evaluated the site...

  18. Corrective Action Investigation Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, with Errata Sheet, Revision 0 (in English; Afrikaans)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less

  19. Sustainable energy planning decision using the intuitionistic fuzzy analytic hierarchy process: choosing energy technology in Malaysia

    NASA Astrophysics Data System (ADS)

    Abdullah, Lazim; Najib, Liana

    2016-04-01

    Energy consumption for developing countries is sharply increasing due to the higher economic growth due to industrialisation along with population growth and urbanisation. The increasing demand of energy leads to global energy crisis. Selecting the best energy technology and conservation requires both quantitative and qualitative evaluation criteria. The fuzzy set-based approach is one of the well-known theories to handle fuzziness, uncertainty in decision-making and vagueness of information. This paper proposes a new method of intuitionistic fuzzy analytic hierarchy process (IF-AHP) to deal with the uncertainty in decision-making. The new IF-AHP is applied to establish a preference in the sustainable energy planning decision-making problem. Three decision-makers attached with Malaysian government agencies were interviewed to provide linguistic judgement prior to analysing with the new IF-AHP. Nuclear energy has been decided as the best alternative in energy planning which provides the highest weight among all the seven alternatives.

  20. A School Desegregation Plan for East Baton Rouge Parish.

    ERIC Educational Resources Information Center

    Rossell, Christine H.

    This paper outlines an alternative desegregation plan that would replace the one implemented in the East Baton Rouge Parish (Louisiana) School District in 1981. Known as the Incentives Desegregation Plan, the alternative plan was designed to produce interracial contact comparable to the earlier plan, without incurring the attendant costs of…

  1. 14 CFR 121.633 - Considering time-limited systems in planning ETOPS alternates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Flight Release Rules § 121.633 Considering time-limited systems in planning ETOPS alternates. (a) For... planning ETOPS alternates. 121.633 Section 121.633 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... dispatch or flight release if the time needed to fly to that airport (at the approved one-engine...

  2. 14 CFR 121.633 - Considering time-limited systems in planning ETOPS alternates.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Flight Release Rules § 121.633 Considering time-limited systems in planning ETOPS alternates. (a) For... planning ETOPS alternates. 121.633 Section 121.633 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... dispatch or flight release if the time needed to fly to that airport (at the approved one-engine...

  3. 14 CFR 121.633 - Considering time-limited systems in planning ETOPS alternates.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Flight Release Rules § 121.633 Considering time-limited systems in planning ETOPS alternates. (a) For... planning ETOPS alternates. 121.633 Section 121.633 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... dispatch or flight release if the time needed to fly to that airport (at the approved one-engine...

  4. 14 CFR 121.633 - Considering time-limited systems in planning ETOPS alternates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Flight Release Rules § 121.633 Considering time-limited systems in planning ETOPS alternates. (a) For... planning ETOPS alternates. 121.633 Section 121.633 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... dispatch or flight release if the time needed to fly to that airport (at the approved one-engine...

  5. 14 CFR 121.633 - Considering time-limited systems in planning ETOPS alternates.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Flight Release Rules § 121.633 Considering time-limited systems in planning ETOPS alternates. (a) For... planning ETOPS alternates. 121.633 Section 121.633 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... dispatch or flight release if the time needed to fly to that airport (at the approved one-engine...

  6. 78 FR 76855 - Record of Decision for the General Management Plan/Wilderness Study, Fort Pulaski National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... the availability of the Record of Decision (ROD) for the General Management Plan/Wilderness Study (GMP... and development of the national monument in the GMP/WS/ FEIS, Alternative A--no action Alternative, and two action Alternatives. The preferred alternative (Alternative B) from the GMP/ WS/FEIS [[Page...

  7. Evaluation of the user requirements processes for NASA terrestrial applications programs

    NASA Technical Reports Server (NTRS)

    1982-01-01

    To support the evolution of increasingly sound user requirements definition processes that would meet the broad range of NASA's terrestrial applications planning and management needs during the 1980's, the user requirements processes as they function in the real world at the senior and middle management levels were evaluated. Special attention was given to geologic mapping and domestic crop reporting to provide insight into problems associated with the development and management of user established conventional practices and data sources. An attempt was made to identify alternative NASA user interfaces that sustain strengths, alleviate weaknesses, maximize application to multiple problems, and simplify management cognizance. Some of the alternatives are outlined and evaluated. It is recommended that NASA have an identified organizational point of focus for consolidation and oversight of the user processes.

  8. Assateague Island National Seashore alternative transportation systems planning study and business plan for alternative transportation

    DOT National Transportation Integrated Search

    2012-08-31

    The purpose of this study was to (1) study the potential expansion of existing alternative transportation systems (bicycle facilities) and development of new alternative transportation systems in and around the Maryland District of Assateague Island ...

  9. Assessing the performances of low impact development alternatives by long-term simulation for a semi-arid area in Tianjin, northern China.

    PubMed

    Huang, Jinhui Jeanne; Li, Yu; Niu, Shuai; Zhou, Shu H

    2014-01-01

    For areas that are urbanized rapidly, the practice of low impact development (LID) has gained an important place in stormwater management and urban planning due to its capability and beneficial effects in restoring the original hydrological cycle. The performances of LID alternatives can vary substantially due to different climate conditions. This study investigated the performances of five LID alternatives under a semi-arid climate in northern China on water balance and flood control. A numerical model, Storm Water Management Model version 5 (US Environmental Protection Agency), was employed to run 10 years' rainfall events for these objectives. Two evaluation methods were proposed in this study: the efficiency index for water balance and a performance radar chart. The investigation of the five LID alternatives revealed that these LID alternatives functioned differently in flood control and water balance, and porous pavement performed best in all indices except the lag time. The two evaluation methods, in conjunction with the long-term numerical simulation, can facilitate design and decision making by providing a clear picture of the performance and functions for these LID alternatives.

  10. Wichita Mountains Wildlife Refuge - Comprehensive Alternative Transportation Plan

    DOT National Transportation Integrated Search

    2014-05-01

    The Comprehensive Alternative Transportation Plan for Wichita Mountains Wildlife Refuge in southwestern Oklahoma analyzes a range of transportation and resource management challenges and documents a holistic set of alternative transportation strategi...

  11. 12 CFR 228.27 - Strategic plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Strategic plan. 228.27 Section 228.27 Banks and... REINVESTMENT (REGULATION BB) Standards for Assessing Performance § 228.27 Strategic plan. (a) Alternative...(s) under a strategic plan if: (1) The bank has submitted the plan to the Board as provided for in...

  12. Quality Practices of Alternative Education Learning Environments as Represented in Virginia's Individual Student Alternative Education Plan (ISAEP) Program

    ERIC Educational Resources Information Center

    Feltman, Doris R.

    2013-01-01

    The purpose of this study was to analyze a prominent alternative education practice in the Commonwealth of Virginia through an analysis of the Virginia Department of Education's Individual Student Alternative Education Plan (ISAEP) program and the alternative education environment it provides. This was a descriptive study using non-experimental…

  13. Recent advances in applying decision science to managing national forests

    USGS Publications Warehouse

    Marcot, Bruce G.; Thompson, Matthew P.; Runge, Michael C.; Thompson, Frank R.; McNulty, Steven; Cleaves, David; Tomosy, Monica; Fisher, Larry A.; Andrew, Bliss

    2012-01-01

    Management of federal public forests to meet sustainability goals and multiple use regulations is an immense challenge. To succeed, we suggest use of formal decision science procedures and tools in the context of structured decision making (SDM). SDM entails four stages: problem structuring (framing the problem and defining objectives and evaluation criteria), problem analysis (defining alternatives, evaluating likely consequences, identifying key uncertainties, and analyzing tradeoffs), decision point (identifying the preferred alternative), and implementation and monitoring the preferred alternative with adaptive management feedbacks. We list a wide array of models, techniques, and tools available for each stage, and provide three case studies of their selected use in National Forest land management and project plans. Successful use of SDM involves participation by decision-makers, analysts, scientists, and stakeholders. We suggest specific areas for training and instituting SDM to foster transparency, rigor, clarity, and inclusiveness in formal decision processes regarding management of national forests.

  14. Ecological risks of DOE`s programmatic environmental restoration alternatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representativemore » facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.« less

  15. Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 3: The GREEDY algorithm

    NASA Technical Reports Server (NTRS)

    Dupnick, E.; Wiggins, D.

    1980-01-01

    The functional specifications, functional design and flow, and the program logic of the GREEDY computer program are described. The GREEDY program is a submodule of the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program and has been designed as a continuation of the shuttle Mission Payloads (MPLS) program. The MPLS uses input payload data to form a set of feasible payload combinations; from these, GREEDY selects a subset of combinations (a traffic model) so all payloads can be included without redundancy. The program also provides the user a tutorial option so that he can choose an alternate traffic model in case a particular traffic model is unacceptable.

  16. A Preventive Intervention Program for Urban African American Youth Attending an Alternative Education Program: Background, Implementation, and Feasibility.

    PubMed

    Carswell, Steven B; Hanlon, Thomas E; O'Grady, Kevin E; Watts, Amy M; Pothong, Pattarapan

    2009-01-01

    This paper presents background, implementation, and feasibility findings associated with planning and conducting an after-school intervention program in an alternative education setting designed to prevent the initiation and escalation of violence and substance abuse among urban African American youth at high risk for life-long problem behaviors. Evolving from earlier preventive interventions implemented in clinic and school settings, the program, entitled The Village Model of Care, consisted of structured group mentoring, parental support, and community outreach services administered to alternative education students and their primary caregiver(s) during the school year. Over a two-year intake period, 109 youth participated in the present process evaluation study. Findings from the study not only provided relevant demographic information on the characteristics of youth likely to be included in such programs but also indicated the importance of including the family in the rehabilitation effort and the need for school administrative system support for the underlying alternative education approach. The information presented in this report has a direct bearing on the planning of future prevention efforts conducted in similar settings that are aimed at reducing problem behaviors and promoting positive lifestyles among high-risk youth.

  17. [Economic evaluation of health technologies: theory and practice].

    PubMed

    Abadi-Korek, Ifat; Shemer, Joshua

    2008-06-01

    Health care systems are committed to maintain and improve the health of their citizens in an effective, fair and accessible way. New medical technologies that offer improvement upon existing alternatives are progressing at a rapid pace. These new sophisticated health technologies are high priced and have been viewed as a significant factor in increasing the cost of healthcare expenditures. The abundance of new medical alternatives, combined with scarcity of resources, has led to the need for priority setting in a way that maximizes the health benefit of those insured. Economic evaluation of medical technologies is the analysis which compares the costs and consequences of alternative healthcare interventions. Economic evaluation of medical technologies can be used by policy makers as a tool to aid in resource allocation decisions. The inclusion of an economic perspective in the evaluation of health and health care has become an increasingly accepted component of health policy and planning. The health care system in Israel has come to acknowledge the advantages of this method. There is still a need for more suitable and structured guidelines to conducting economic evaluation in order to make this emergent and welcome process and its products useable.

  18. Strategic planning decision making using fuzzy SWOT-TOPSIS with reliability factor

    NASA Astrophysics Data System (ADS)

    Mohamad, Daud; Afandi, Nur Syamimi; Kamis, Nor Hanimah

    2015-10-01

    Strategic planning is a process of decision making and action for long-term activities in an organization. The Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis has been commonly used to help organizations in strategizing their future direction by analyzing internal and external environment. However, SWOT analysis has some limitations as it is unable to prioritize appropriately the multiple alternative strategic decisions. Some efforts have been made to solve this problem by incorporating Multi Criteria Decision Making (MCDM) methods. Nevertheless, another important aspect has raised concerns on obtaining the decision that is the reliability of the information. Decision makers evaluate differently depending on their level of confidence or sureness in the evaluation. This study proposes a decision making procedure for strategic planning using SWOT-TOPSIS method by incorporating the reliability factor of the evaluation based on Z-number. An example using a local authority in the east coast of Malaysia is illustrated to determine the strategic options ranking and to prioritize factors in each SWOT category.

  19. CHANGES SDSS: the development of a Spatial Decision Support System for analysing changing hydro-meteorological risk

    NASA Astrophysics Data System (ADS)

    van Westen, Cees; Bakker, Wim; Zhang, Kaixi; Jäger, Stefan; Assmann, Andre; Kass, Steve; Andrejchenko, Vera; Olyazadeh, Roya; Berlin, Julian; Cristal, Irina

    2014-05-01

    Within the framework of the EU FP7 Marie Curie Project CHANGES (www.changes-itn.eu) and the EU FP7 Copernicus project INCREO (http://www.increo-fp7.eu) a spatial decision support system is under development with the aim to analyse the effect of risk reduction planning alternatives on reducing the risk now and in the future, and support decision makers in selecting the best alternatives. The Spatial Decision Support System will be composed of a number of integrated components. The Risk Assessment component allows to carry out spatial risk analysis, with different degrees of complexity, ranging from simple exposure (overlay of hazard and assets maps) to quantitative analysis (using different hazard types, temporal scenarios and vulnerability curves) resulting into risk curves. The platform does not include a component to calculate hazard maps, and existing hazard maps are used as input data for the risk component. The second component of the SDSS is a risk reduction planning component, which forms the core of the platform. This component includes the definition of risk reduction alternatives (related to disaster response planning, risk reduction measures and spatial planning) and links back to the risk assessment module to calculate the new level of risk if the measure is implemented, and a cost-benefit (or cost-effectiveness/ Spatial Multi Criteria Evaluation) component to compare the alternatives and make decision on the optimal one. The third component of the SDSS is a temporal scenario component, which allows to define future scenarios in terms of climate change, land use change and population change, and the time periods for which these scenarios will be made. The component doesn't generate these scenarios but uses input maps for the effect of the scenarios on the hazard and assets maps. The last component is a communication and visualization component, which can compare scenarios and alternatives, not only in the form of maps, but also in other forms (risk curves, tables, graphs). The envisaged users of the platform are organizations involved in planning of risk reduction measures, and that have staff capable of visualizing and analysing spatial data at a municipal scale.

  20. Comparison of Radiation Treatment Plans for Breast Cancer between 3D Conformal in Prone and Supine Positions in Contrast to VMAT and IMRT Supine Positions

    NASA Astrophysics Data System (ADS)

    Bejarano Buele, Ana Isabel

    The treatment regimen for breast cancer patients typically involves Whole Breast Irradiation (WBI). The coverage and extent of the radiation treatment is dictated by location of tumor mass, breast tissue distribution, involvement of lymph nodes, and other factors. The current standard treatment approach used at our institution is a 3D tangential beam geometry, which involves two fields irradiating the breast, or a four field beam arrangement covering the whole breast and involved nodes, while decreasing the dose to organs as risk (OARs) such as the lung and heart. The coverage of these targets can be difficult to achieve in patients with unfavorable thoracic geometries, especially in those cases in which the planning target volume (PTV) is extended to the chest wall. It is a well-known fact that exposure of the heart to ionizing radiation has been proved to increase the subsequent rate of ischemic heart disease. In these cases, inverse planned treatments have become a proven alternative to the 3D approach. The goal of this research project is to evaluate the factors that affect our current techniques as well as to adapt the development of inverse modulated techniques for our clinic, in which breast cancer patients are one of the largest populations treated. For this purpose, a dosimetric comparison along with the evaluation of immobilization devices was necessary. Radiation treatment plans were designed and dosimetrically compared for 5 patients in both, supine and prone positions. For 8 patients, VMAT and IMRT plans were created and evaluated in the supine position. Skin flash incorporation for inverse modulated plans required measurement of the surface dose as well as an evaluation of breast volume changes during a treatment course. It was found that prone 3D conformal plans as well as the VMAT and IMRT plans are generally superior in sparing OARs to supine plans with comparable PTV coverage. Prone setup leads to larger shifts in breast volume as well as in positioning due to the difference in target geometry and nature of the immobilization device. IMRT and VMAT plans offer sparing of OARs from high dose regions with an increase of irradiated volume in the low dose regions. Skin flash incorporation was found to be accurate with the use of virtual bolus in the TPS for inverse modulated plans. Various factors influencing dose delivery in breast cancer radiation treatments were examined and quantified. Practical recommendations developed in the course of this project can improve our current techniques and provide alternatives to treat unique and challenging clinical cases.

  1. Natura 2000 appropriate assessment: Shortcomings and improvements in Finnish practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soederman, Tara

    2009-02-15

    The EU Habitats Directive 92/43/EEC requires impact assessments called Appropriate Assessments (AA) for plans and projects probably having adverse effects on the sites of European ecological importance, Natura 2000 sites. Seventy-three Appropriate Assessment reports and seventy official opinions given on them by regional environmental authorities from 1997 to 2005 were reviewed. The findings of the study demonstrate typical shortcomings of ecological impact assessment: a weak information basis for assessment outcomes and lack of proper cumulative impact assessment with respect to ecological structures and processes. The quality of reporting has improved over time with respect to direct impacts on individual habitatmore » types and species and detailed mitigation measures. Regional environment centres considered one fifth of the AA reports to be inadequate because of lacking data. In most cases the regional environment centres demanded a change of plan or project, added mitigation measures, choice of only one alternative for further planning or a new completed assessment with additional information in order to be able to evaluate the significance of the effects. The study underlines the need for iterative planning practices in which the preparation of a plan or project with alternative options goes hand in hand with the impact assessment equipped with sufficient data.« less

  2. Incorporate Imaging Characteristics Into an Arteriovenous Malformation Radiosurgery Plan Evaluation Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang Pengpeng; Department of Medical Physics, Memorial Sloan-Kettering Cancer Center, New York, NY; Wu, Leester

    Purpose: To integrate imaging performance characteristics, specifically sensitivity and specificity, of magnetic resonance angiography (MRA) and digital subtraction angiography (DSA) into arteriovenous malformation (AVM) radiosurgery planning and evaluation. Methods and Materials: Images of 10 patients with AVMs located in critical brain areas were analyzed in this retrospective planning study. The image findings were first used to estimate the sensitivity and specificity of MRA and DSA. Instead of accepting the imaging observation as a binary (yes or no) mapping of AVM location, our alternative is to translate the image into an AVM probability distribution map by incorporating imagers' sensitivity and specificity,more » and to use this map as a basis for planning and evaluation. Three sets of radiosurgery plans, targeting the MRA and DSA positive overlap, MRA positive, and DSA positive were optimized for best conformality. The AVM obliteration rate (ORAVM) and brain complication rate served as endpoints for plan comparison. Results: In our 10-patient study, the specificities and sensitivities of MRA and DSA were estimated to be (0.95, 0.74) and (0.71, 0.95), respectively. The positive overlap of MRA and DSA accounted for 67.8% {+-} 4.9% of the estimated true AVM volume. Compared with plans targeting MRA and DSA-positive overlap, plans targeting MRA-positive or DSA-positive improved ORAVM by 4.1% {+-} 1.9% and 15.7% {+-} 8.3%, while also increasing the complication rate by 1.0% {+-} 0.8% and 4.4% {+-} 2.3%, respectively. Conclusions: The impact of imagers' quality should be quantified and incorporated in AVM radiosurgery planning and evaluation to facilitate clinical decision making.« less

  3. Morristown National Historical Park (NHP) alternative transportation system planning study

    DOT National Transportation Integrated Search

    2001-12-01

    This alternative transportation plan aims to define a more efficient transit plan for visitors to Morristown. Goals include protecting environmental resources, improving visitor experiences and safety, maximizing use of infrastructure, ensuring compa...

  4. National Surface Water Survey, western wilderness area lakes: environmental assessment. Draft

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-03-01

    The US Environmental Protection Agency (EPA) is proposing to sample 498 lakes in federally designated wilderness areas and national parks during the western part of the National Surface Water Survey (NSW). The NSWS has been undertaken to provide high quality data for evaluating the nature and extent of acid deposition throughout the United States. Sampling protocols established for the national survey call for the use of helicopters to gain access to lakes for sampling. Helicopters have already been used in the eastern and midwestern parts of the survey. The US Forest Service (FS) and the National Park Service (NPS) willmore » have to decide which sampling plan for wilderness areas, if any, can be approved under the Wilderness Act of 1964. This Environmental Assessment (EA) has been prepared to evaluate the environmental consequences of alternative means of gaining access to wilderness areas to meet the objectives of the NSWS. Based on this evaluation, EPA has reviewed the possible sampling alternatives and reached a conclusion on the preferred alternative. This assessment is being provided to the FS and the NPS for their use in evaluating the alternatives, including EPA's preferred one. As a result of its evaluation, EPA believes that wilderness area lakes should be included in the survey and that the preferred means of access is using helicopters. 94 references, 14 figures, 18 tables.« less

  5. A Pilot Study of Verbal Learning in Young Aggressive Boys. Appendix H.

    ERIC Educational Resources Information Center

    Camp, Bonnie W.

    Provided is the manual for the "Think Aloud" program for young aggressive boys which is designed to slow down and inhibit first associations; increase verbal mediation; inhibit immature, irrelevant speech; increase repertory of alternative responses; increase skill in staying with a plan and evaluating outcomes; and facilitate transfer…

  6. Evaluating Eyewitness Reports [Lesson Plan].

    ERIC Educational Resources Information Center

    2000

    This lesson offers students experience in making historical meaning from eyewitness accounts that present a range of different perspectives. Students begin with a case study in working with alternative reports of a single event: the Great Chicago Fire of 1871. First, they compare two newspaper reports on the fire, then two memoirs of the fire…

  7. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  8. Editor's Corner: The View from Treeline....Personal Observations Regarding Teacher Recruitment, Training, and Retention.

    ERIC Educational Resources Information Center

    Kopriva, Peter

    1989-01-01

    This editorial briefly explores issues in special education focusing on: teacher shortages; use of alternative certification; the need for teaching candidates to have knowledge of teaching strategies, classroom management, course planning, and student evaluation; and the need to offer support and guidance to beginning teachers. (JDD)

  9. 75 FR 70266 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Nutrition Facts label format to require, the Agency undertook consumer research to evaluate alternatives (Refs. 1, 2, and 3). More recently, FDA conducted qualitative consumer research on the format of the.... 5). In addition to conducting consumer research, in response to the OWG plan FDA issued two advance...

  10. Production of Reading Materials. Self Study and Evaluation Guide, 1982 Edition. Section D-7. Revised.

    ERIC Educational Resources Information Center

    National Accreditation Council for Agencies Serving the Blind and Visually Handicapped, New York, NY.

    The guide provides accreditation standards for programs which transcribe printed matter into alternate media for blind and visually handicapped persons. Presented in a self study format, the booklet touches upon six aspects of the production of reading materials (sample subtopics in parentheses): planning and organization (administration,…

  11. Innovative Compensation Systems: Implications for Employers, Unions, and Government. Background Paper No. 33.

    ERIC Educational Resources Information Center

    Schuster, Michael

    An examination of the innovative compensation systems called gainsharing, profit-sharing, pay-for-knowledge, two-tier wage plans, and lump sum bonuses has the following public policy implications: (1) more research is needed to evaluate the private and public sectors' experience with those alternative systems; (2) gainsharing and profit-sharing…

  12. The Use of the Barclay Classroom Climate Inventory in Curriculum Planning and Intervention.

    ERIC Educational Resources Information Center

    Hawn, Horace C.; Poole, Edward A.

    The Barclay Classroom Climate Inventory (BCCI) was used in the Athens Teacher Corps Project to appraise individual differences among students in grades 3-5, to guide in selecting alternative curriculum strategies for children with identified skill deficits, and to evaluate the effectiveness of those selected strategies. Intervention strategies…

  13. Integrated management of timber and deer: coastal forests of British Columbia and Alaska.

    Treesearch

    J.B. Nyberg; R.S. McNay; M.D. [and others] Kirchhoff

    1989-01-01

    Current techniques for integrating timber and deer management in coastal British Columbia and Alaska are reviewed and evaluated. Integration can be improved by setting objectives for deer habitat and timber, improving managers' knowledge of interactions, and providing planning tools to analyze alternative programs of forest management. A handbook designed to...

  14. 75 FR 10309 - Wisconsin Statewide Habitat Conservation Plan for Karner Blue Butterfly

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... announce that we have gathered the information necessary to: (1) Determine the impacts and formulate... Wisconsin, if we renew the permit. Incidental take occurs as a result of impacts of otherwise lawful land.... We have issued an environmental assessment to evaluate the impacts of the alternatives for renewal of...

  15. Bridging the gap between habitat-modeling research and bird conservation with dynamic landscape and population models

    Treesearch

    Frank R., III Thompson

    2009-01-01

    Habitat models are widely used in bird conservation planning to assess current habitat or populations and to evaluate management alternatives. These models include species-habitat matrix or database models, habitat suitability models, and statistical models that predict abundance. While extremely useful, these approaches have some limitations.

  16. Bureau of Land Management density management study.

    Treesearch

    John Cissel; Paul Anderson; Shanti Berryman; Sam Chan; Deanna Olson; Klaus Puettman

    2004-01-01

    The Bureau of Land Management (BLM), Pacific Northwest Research Station (PNW), U.S. Geological Survey (USGS), and Oregon State University (OSU) established the Density Management Study (DMS) in 1994 to develop and test options for young stand management to meet Northwest Forest Plan objectives in western Oregon. The DMS demonstrates and evaluates alternative approaches...

  17. Engineering study for closure of 209E facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  18. The application of seismic risk-benefit analysis to land use planning in Taipei City.

    PubMed

    Hung, Hung-Chih; Chen, Liang-Chun

    2007-09-01

    In the developing countries of Asia local authorities rarely use risk analysis instruments as a decision-making support mechanism during planning and development procedures. The main purpose of this paper is to provide a methodology to enable planners to undertake such analyses. We illustrate a case study of seismic risk-benefit analysis for the city of Taipei, Taiwan, using available land use maps and surveys as well as a new tool developed by the National Science Council in Taiwan--the HAZ-Taiwan earthquake loss estimation system. We use three hypothetical earthquakes to estimate casualties and total and annualised direct economic losses, and to show their spatial distribution. We also characterise the distribution of vulnerability over the study area using cluster analysis. A risk-benefit ratio is calculated to express the levels of seismic risk attached to alternative land use plans. This paper suggests ways to perform earthquake risk evaluations and the authors intend to assist city planners to evaluate the appropriateness of their planning decisions.

  19. Resource Limitation Issues In Real-Time Intelligent Systems

    NASA Astrophysics Data System (ADS)

    Green, Peter E.

    1986-03-01

    This paper examines resource limitation problems that can occur in embedded AI systems which have to run in real-time. It does this by examining two case studies. The first is a system which acoustically tracks low-flying aircraft and has the problem of interpreting a high volume of often ambiguous input data to produce a model of the system's external world. The second is a robotics problem in which the controller for a robot arm has to dynamically plan the order in which to pick up pieces from a conveyer belt and sort them into bins. In this case the system starts with a continuously changing model of its environment and has to select which action to perform next. This latter case emphasizes the issues in designing a system which must operate in an uncertain and rapidly changing environment. The first system uses a distributed HEARSAY methodology running on multiple processors. It is shown, in this case, how the com-binatorial growth of possible interpretation of the input data can require large and unpredictable amounts of computer resources for data interpretation. Techniques are presented which achieve real-time operation by limiting the combinatorial growth of alternate hypotheses and processing those hypotheses that are most likely to lead to meaningful interpretation of the input data. The second system uses a decision tree approach to generate and evaluate possible plans of action. It is shown how the combina-torial growth of possible alternate plans can, as in the previous case, require large and unpredictable amounts of computer time to evalu-ate and select from amongst the alternative. The use of approximate decisions to limit the amount of computer time needed is discussed. The use of concept of using incremental evidence is then introduced and it is shown how this can be used as the basis of systems that can combine heuristic and approximate evidence in making real-time decisions.

  20. Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Lewis, pattie

    2011-01-01

    Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

  1. The use of scenario analysis in local public health departments: alternative futures for strategic planning.

    PubMed Central

    Venable, J M; Ma, Q L; Ginter, P M; Duncan, W J

    1993-01-01

    Scenario analysis is a strategic planning technique used to describe and evaluate an organization's external environment. A methodology for conducting scenario analysis using the Jefferson County Department of Health and the national, State, and county issues confronting it is outlined. Key health care and organizational issues were identified using published sources, focus groups, questionnaires, and personal interviews. The most important of these issues were selected by asking health department managers to evaluate the issues according to their probability of occurrence and likely impact on the health department. The high-probability, high-impact issues formed the basis for developing scenario logics that constitute the story line holding the scenario together. The results were a set of plausible scenarios that aided in strategic planning, encouraged strategic thinking among managers, eliminated or reduced surprise about environmental changes, and improved managerial discussion and communication. PMID:8265754

  2. Straight talk. New approaches in healthcare. Capital financing: beyond the shores of your typical transaction.

    PubMed

    Bremner, James D; Bielak, Jerry J; Elek, Steven; Wootton, Ian

    2003-11-24

    If you're in the market to renovate or expand but are concerned about overloading your balance sheet with debt or if you plan to build a for-profit facility, consider a Design, Build, Finance, and Operate (DBFO) arrangement. In such deals, experts in finance, construction, real estate, and support-service provision manage risk and day-to-day responsibility for facility management. Evaluating alternatives to tax-exempt financing is a critical piece of capital planning today because competition for traditional sources of funding has become global.

  3. The American Jobs Creation Act and its impact on deferred compensation: reassessment from a business perspective.

    PubMed

    Johnson, David G

    2005-01-01

    The American Jobs Creation Act (AJCA), which was signed into law in October 2004, will have an impact on almost every deferred compensation program in the United States. This article argues that as companies continue to evaluate the transition alternatives under AJCA and contemplate the necessary changes to the plan program, companies also should consider simultaneously addressing broader issues surrounding nonqualified deferred compensation arrangements. These include ongoing business purpose, financial planning considerations, education of participants, corporate governance considerations and the potential implications to international assignees.

  4. 29 CFR 2520.104-4 - Alternative method of compliance for certain successor pension plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pension plans. 2520.104-4 Section 2520.104-4 Labor Regulations Relating to Labor (Continued) EMPLOYEE... certain successor pension plans. (a) General. Under the authority of section 110 of the Act, this section sets forth an alternative method of compliance for certain successor pension plans in which some...

  5. Predicting the effectiveness of road safety campaigns through alternative research designs.

    PubMed

    Adamos, Giannis; Nathanail, Eftihia

    2016-12-01

    A large number of road safety communication campaigns have been designed and implemented in the recent years; however their explicit impact on driving behavior and road accident rates has been estimated in a rather low proportion. Based on the findings of the evaluation of three road safety communication campaigns addressing the issues of drinking and driving, seat belt usage, and driving fatigue, this paper applies different types of research designs (i.e., experimental, quasi-experimental, and non-experimental designs), when estimating the effectiveness of road safety campaigns, implements a cross-design assessment, and conducts a cross-campaign evaluation. An integrated evaluation plan was developed, taking into account the structure of evaluation questions, the definition of measurable variables, the separation of the target audience into intervention (exposed to the campaign) and control (not exposed to the campaign) groups, the selection of alternative research designs, and the appropriate data collection methods and techniques. Evaluating the implementation of different research designs in estimating the effectiveness of road safety campaigns, results showed that the separate pre-post samples design demonstrated better predictability than other designs, especially in data obtained from the intervention group after the realization of the campaign. The more constructs that were added to the independent variables, the higher the values of the predictability were. The construct that most affects behavior is intention, whereas the rest of the constructs have a lower impact on behavior. This is particularly significant in the Health Belief Model (HBM). On the other hand, behavioral beliefs, normative beliefs, and descriptive norms, are significant parameters for predicting intention according to the Theory of Planned Behavior (TPB). The theoretical and applied implications of alternative research designs and their applicability in the evaluation of road safety campaigns are provided by this study. Copyright © 2016 Elsevier Ltd and National Safety Council. All rights reserved.

  6. Designing cost effective water demand management programs in Australia.

    PubMed

    White, S B; Fane, S A

    2002-01-01

    This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.

  7. Experimental Evaluation of a Planning Language Suitable for Formal Verification

    NASA Technical Reports Server (NTRS)

    Butler, Rick W.; Munoz, Cesar A.; Siminiceanu, Radu I.

    2008-01-01

    The marriage of model checking and planning faces two seemingly diverging alternatives: the need for a planning language expressive enough to capture the complexity of real-life applications, as opposed to a language simple, yet robust enough to be amenable to exhaustive verification and validation techniques. In an attempt to reconcile these differences, we have designed an abstract plan description language, ANMLite, inspired from the Action Notation Modeling Language (ANML) [17]. We present the basic concepts of the ANMLite language as well as an automatic translator from ANMLite to the model checker SAL (Symbolic Analysis Laboratory) [7]. We discuss various aspects of specifying a plan in terms of constraints and explore the implications of choosing a robust logic behind the specification of constraints, rather than simply propose a new planning language. Additionally, we provide an initial assessment of the efficiency of model checking to search for solutions of planning problems. To this end, we design a basic test benchmark and study the scalability of the generated SAL models in terms of plan complexity.

  8. Short Lesson Plan Associated with Increased Acceptance of Evolutionary Theory and Potential Change in Three Alternate Conceptions of Macroevolution in Undergraduate Students

    ERIC Educational Resources Information Center

    Abraham, Joel K.; Perez, Kathryn E.; Downey, Nicholas; Herron, Jon C.; Meir, Eli

    2012-01-01

    Undergraduates commonly harbor alternate conceptions about evolutionary biology; these alternate conceptions often persist, even after intensive instruction, and may influence acceptance of evolution. We interviewed undergraduates to explore their alternate conceptions about macroevolutionary patterns and designed a 2-h lesson plan to present…

  9. Systems Engineering Management Guide,

    DTIC Science & Technology

    1990-01-01

    6•’-&-S- A -i-2-- -4-$-6-7-6-I SPEED AN0 INDURA6Ca CARGO CAPACITY ,- .- ,-,-,-$-- -,-$-4-,-,-7-,-U LOOISTICSR&M CARGO CAPACITY -- - - - -3.2- - 3-4...only subjective and to predict a level of performance with ( high , medium, low) evaluation is possible. respect to each attribute for each alternative For...criterion; evaluated as having an expected speed of however, some fixed plan for scoring 31.5 knots would receive a score of .50, while performance

  10. Integrating market processes into utility resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kahn, E.P.

    1992-11-01

    Integrated resource planning has resulted in an abundance of alternatives for meeting existing and new demand for electricity services: (1) utility demand-side management (DSM) programs, (2) DSM bidding, (3) competitive bidding for private power supplies, (4) utility re-powering, and (5) new utility construction. Each alternative relies on a different degree of planning for implementation and, therefore, each alternative relies on markets to a greater or lesser degree. This paper shows how the interaction of planning processes and market forces results in resource allocations among the alternatives. The discussion focuses on three phenomena that are driving forces behind the unanticipated consequences'more » of contemporary integrated resource planning efforts. These forces are: (1) large-scale DSM efforts, (2) customer bypass, and (3) large-scale independent power projects. 22 refs., 3 figs., 2 tabs.« less

  11. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada: Revision 0, Including Record of Technical Change No. 1 and No. 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less

  12. A Model to Translate Evidence-Based Interventions Into Community Practice

    PubMed Central

    Christiansen, Ann L.; Peterson, Donna J.; Guse, Clare E.; Maurana, Cheryl A.; Brandenburg, Terry

    2012-01-01

    There is a tension between 2 alternative approaches to implementing community-based interventions. The evidence-based public health movement emphasizes the scientific basis of prevention by disseminating rigorously evaluated interventions from academic and governmental agencies to local communities. Models used by local health departments to incorporate community input into their planning, such as the community health improvement process (CHIP), emphasize community leadership in identifying health problems and developing and implementing health improvement strategies. Each approach has limitations. Modifying CHIP to formally include consideration of evidence-based interventions in both the planning and evaluation phases leads to an evidence-driven community health improvement process that can serve as a useful framework for uniting the different approaches while emphasizing community ownership, priorities, and wisdom. PMID:22397341

  13. Plolyamines and other secondary metabolites of green-leaf and red-leaf almond rootstocks triggered in response to salinity

    USDA-ARS?s Scientific Manuscript database

    Almond trees are very sensitive to salinity, and saline water is the only alternative for irrigation in many semiarid regions. Thus, the use of salt-tolerant rootstocks may allow an economically-feasible yield under saline irrigation. In this study, we evaluated the effects of chloride salts on plan...

  14. Decision Support Framework (DSF) For Evaluating Planned Land And Resource Use Decisions: Hypothetical Application Of The DSF To Address Nutrient Loads In The Florida Keys

    EPA Science Inventory

    The mission of ORD's Ecosystme Services Research Program (ESRP) is to provide the information and methods needed by decision-makers to assess the benefits of ecosystem goods and services to human well-being for inclusion in management alternatives. The Decision Support Framework...

  15. Cape Cod National Seashore alternative transportation systems long range planning study

    DOT National Transportation Integrated Search

    2003-05-01

    This project involves the development of short-range and long-range plans for alternative transportation to, from, and within the Cape Cod National Seashore. The five-year plan notes that improved public transportation services are needed both to mit...

  16. Study of research and development requirements of small gas-turbine combustors

    NASA Technical Reports Server (NTRS)

    Demetri, E. P.; Topping, R. F.; Wilson, R. P., Jr.

    1980-01-01

    A survey is presented of the major small-engine manufacturers and governmental users. A consensus was undertaken regarding small-combustor requirements. The results presented are based on an evaluation of the information obtained in the course of the study. The current status of small-combustor technology is reviewed. The principal problems lie in liner cooling, fuel injection, part-power performance, and ignition. Projections of future engine requirements and their effect on the combustor are discussed. The major changes anticipated are significant increases in operating pressure and temperature levels and greater capability of using heavier alternative fuels. All aspects of combustor design are affected, but the principal impact is on liner durability. An R&D plan which addresses the critical combustor needs is described. The plan consists of 15 recommended programs for achieving necessary advances in the areas of liner thermal design, primary-zone performance, fuel injection, dilution, analytical modeling, and alternative-fuel utilization.

  17. Finding theory- and evidence-based alternatives to fear appeals: Intervention Mapping

    PubMed Central

    Kok, Gerjo; Bartholomew, L Kay; Parcel, Guy S; Gottlieb, Nell H; Fernández, María E

    2014-01-01

    Fear arousal—vividly showing people the negative health consequences of life-endangering behaviors—is popular as a method to raise awareness of risk behaviors and to change them into health-promoting behaviors. However, most data suggest that, under conditions of low efficacy, the resulting reaction will be defensive. Instead of applying fear appeals, health promoters should identify effective alternatives to fear arousal by carefully developing theory- and evidence-based programs. The Intervention Mapping (IM) protocol helps program planners to optimize chances for effectiveness. IM describes the intervention development process in six steps: (1) assessing the problem and community capacities, (2) specifying program objectives, (3) selecting theory-based intervention methods and practical applications, (4) designing and organizing the program, (5) planning, adoption, and implementation, and (6) developing an evaluation plan. Authors who used IM indicated that it helped in bringing the development of interventions to a higher level. PMID:24811880

  18. 29 CFR 2520.104-27 - Alternative method of compliance for certain unfunded dues financed pension plans maintained by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... financed pension plans maintained by employee organizations. 2520.104-27 Section 2520.104-27 Labor... Alternative method of compliance for certain unfunded dues financed pension plans maintained by employee organizations. (a) Scope. Under the authority of section 110 of the Act, a pension benefit plan that meets the...

  19. 29 CFR 2520.104-23 - Alternative method of compliance for pension plans for certain selected employees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Alternative method of compliance for pension plans for... pension plans for certain selected employees. (a) Purpose and scope. (1) This section contains an... Employee Retirement Income Security Act of 1974 for unfunded or insured pension plans maintained by an...

  20. Thermal energy supply optimization for Edgewood Area, US Army Aberdeen Proving Ground: Energy supply alternatives. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCammon, T.L.; Dilks, C.L.; Savoie, M.J.

    1995-09-01

    Relatively poor performance at the aging central heating plants (OH Ps) and planned changes in steam demand at Aberdeen Proving Ground (APG) Edgewood Area, Aberdeen, MD warranted an investigation of alternatives for providing thermal energy to the installation. This study: (1) evaluated the condition of the APG CHPs and heat distribution system, (2) identified thermal energy supply problems and cost-effective technologies to maintain APG`s capability to produce and distribute the needed thermal energy, and (3) recommended renovation and modernization projects for the system. Heating loads were analyzed using computer simulations, and life cycle costs were developed for each alternative. Recommendedmore » alternatives included upgrading the existing system, installing new boilers, consolidating the central heating plants, and introducing the use of absorption chilling.« less

  1. An index-based robust decision making framework for watershed management in a changing climate.

    PubMed

    Kim, Yeonjoo; Chung, Eun-Sung

    2014-03-01

    This study developed an index-based robust decision making framework for watershed management dealing with water quantity and quality issues in a changing climate. It consists of two parts of management alternative development and analysis. The first part for alternative development consists of six steps: 1) to understand the watershed components and process using HSPF model, 2) to identify the spatial vulnerability ranking using two indices: potential streamflow depletion (PSD) and potential water quality deterioration (PWQD), 3) to quantify the residents' preferences on water management demands and calculate the watershed evaluation index which is the weighted combinations of PSD and PWQD, 4) to set the quantitative targets for water quantity and quality, 5) to develop a list of feasible alternatives and 6) to eliminate the unacceptable alternatives. The second part for alternative analysis has three steps: 7) to analyze all selected alternatives with a hydrologic simulation model considering various climate change scenarios, 8) to quantify the alternative evaluation index including social and hydrologic criteria with utilizing multi-criteria decision analysis methods and 9) to prioritize all options based on a minimax regret strategy for robust decision. This framework considers the uncertainty inherent in climate models and climate change scenarios with utilizing the minimax regret strategy, a decision making strategy under deep uncertainty and thus this procedure derives the robust prioritization based on the multiple utilities of alternatives from various scenarios. In this study, the proposed procedure was applied to the Korean urban watershed, which has suffered from streamflow depletion and water quality deterioration. Our application shows that the framework provides a useful watershed management tool for incorporating quantitative and qualitative information into the evaluation of various policies with regard to water resource planning and management. Copyright © 2013 Elsevier B.V. All rights reserved.

  2. Solar Stirling power generation - Systems analysis and preliminary tests

    NASA Technical Reports Server (NTRS)

    Selcuk, M. K.; Wu, Y.-C.; Moynihan, P. I.; Day, F. D., III

    1977-01-01

    The feasibility of an electric power generation system utilizing a sun-tracking parabolic concentrator and a Stirling engine/linear alternator is being evaluated. Performance predictions and cost analysis of a proposed large distributed system are discussed. Design details and preliminary test results are presented for a 9.5 ft diameter parabolic dish at the Jet Propulsion Laboratory (Caltech) Table Mountain Test Facility. Low temperature calorimetric measurements were conducted to evaluate the concentrator performance, and a helium flow system is being used to test the solar receiver at anticipated working fluid temperatures (up to 650 or 1200 C) to evaluate the receiver thermal performance. The receiver body is designed to adapt to a free-piston Stirling engine which powers a linear alternator assembly for direct electric power generation. During the next phase of the program, experiments with an engine and receiver integrated into the concentrator assembly are planned.

  3. Right service, right place: optimising utilisation of a community nursing service to reduce planned re-presentations to the emergency department.

    PubMed

    Lawton, Jessica Kirsten; Kinsman, Leigh; Dalton, Lisa; Walsh, Fay; Bryan, Helen; Williams, Sharon

    2017-01-01

    Congruent with international rising emergency department (ED) demand, a focus on strategies and services to reduce burden on EDs and improve patient outcomes is necessary. Planned re-presentations of non-urgent patients at a regional Australian hospital exceeded 1200 visits during the 2013-2014 financial year. Planned re-presentations perpetuate demand and signify a lack of alternative services for non-urgent patients. The Community Nursing Enhanced Connections Service (CoNECS) collaboratively evolved between acute care and community services in 2014 to reduce planned ED re-presentations. This study aimed to investigate the evolution and impact of a community nursing service to reduce planned re-presentations to a regional Australian ED and identify enablers and barriers to interventionist effectiveness. A mixed-methods approach evaluated the impact of CoNECS. Data from hospital databases including measured numbers of planned ED re-presentations by month, time of day, age, gender and reason were used to calculate referral rates to CoNECS. These results informed two semistructured focus groups with ED and community nurses. The researchers used a theoretical lens, 'diffusion of innovation', to understand how this service could inform future interventions. Analyses showed that annual ED planned re-presentations decreased by 43% (527 presentations) after implementation. Three themes emerged from the focus groups. These were right service at the right time, nursing uncertainty and system disconnect and medical disengagement. CoNECS reduced overall ED planned re-presentations and was sustained longer than many complex service-level interventions. Factors supporting the service were endorsement from senior administration and strong leadership to drive responsive quality improvement strategies. This study identified a promising alternative service outside the ED, highlighting possibilities for other hospital emergency services aiming to reduce planned re-presentations.

  4. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  5. Agricultural conservation planning framework: 1. Developing multipractice watershed planning scenarios and assessing nutrient reduction potential.

    PubMed

    Tomer, M D; Porter, S A; Boomer, K M B; James, D E; Kostel, J A; Helmers, M J; Isenhart, T M; McLellan, E

    2015-05-01

    Spatial data on soils, land use, and topography, combined with knowledge of conservation effectiveness, can be used to identify alternatives to reduce nutrient discharge from small (hydrologic unit code [HUC]12) watersheds. Databases comprising soil attributes, agricultural land use, and light detection and ranging-derived elevation models were developed for two glaciated midwestern HUC12 watersheds: Iowa's Beaver Creek watershed has an older dissected landscape, and Lime Creek in Illinois is young and less dissected. Subsurface drainage is common in both watersheds. We identified locations for conservation practices, including in-field practices (grassed waterways), edge-of-field practices (nutrient-removal wetlands, saturated buffers), and drainage-water management, by applying terrain analyses, geographic criteria, and cross-classifications to field- and watershed-scale geographic data. Cover crops were randomly distributed to fields without geographic prioritization. A set of alternative planning scenarios was developed to represent a variety of extents of implementation among these practices. The scenarios were assessed for nutrient reduction potential using a spreadsheet approach to calculate the average nutrient-removal efficiency required among the practices included in each scenario to achieve a 40% NO-N reduction. Results were evaluated in the context of the Iowa Nutrient Reduction Strategy, which reviewed nutrient-removal efficiencies of practices and established the 40% NO-N reduction as Iowa's target for Gulf of Mexico hypoxia mitigation by agriculture. In both test watersheds, planning scenarios that could potentially achieve the targeted NO-N reduction but remove <5% of cropland from production were identified. Cover crops and nutrient removal wetlands were common to these scenarios. This approach provides an interim technology to assist local watershed planning and could provide planning scenarios to evaluate using watershed simulation models. A set of ArcGIS tools is being released to enable transfer of this mapping technology. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  6. Effects of an entertainment-education radio soap opera on family planning behavior in Tanzania.

    PubMed

    Rogers, E M; Vaughan, P W; Swalehe, R M; Rao, N; Svenkerud, P; Sood, S

    1999-09-01

    An entertainment-education radio soap opera introduced in Tanzania in 1993 was evaluated by means of a field experimental design in which the radio program was broadcast by seven mainland stations of Radio Tanzania. An eighth station broadcast alternative programming from 1993 to 1995, its listenership serving as a comparison area in which contemporaneous changes in family planning adoption were measured. The soap opera was subsequently broadcast nationwide from 1995 to 1997. Data about the effects of the radio soap opera were gathered in five annual surveys of about 2,750 households in the comparison and the treatment areas and from a sample of new family planning adopters in 79 health clinics. The soap opera had strong behavioral effects on family planning adoption; it increased listeners' self-efficacy regarding family planning adoption and influenced listeners to talk with their spouses and peers about contraception.

  7. Evaluating the heat pump alternative for heating enclosed wastewater treatment facilities in cold regions

    NASA Astrophysics Data System (ADS)

    Martel, C. J.; Phetteplace, G. E.

    1982-05-01

    This report presents a five-step procedure for evaluating the technical and economic feasibility of using heat pumps to recover heat from treatment plant effluent. The procedure is meant to be used at the facility planning level by engineers who are unfamiliar with this technology. An example of the use of the procedure and general design information are provided. Also, the report reviews the operational experience with heat pumps at wastewater plants located in Fairbanks, Alaska, Madison, Wisconsin, and Wilton, Maine.

  8. Waste Treatment And Immobilization Plant U. S. Department Of Energy Office Of River Protection Submerged Bed Scrubber Condensate Disposition Project - Abstract # 13460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yanochko, Ronald M; Corcoran, Connie

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potentialmore » issues associated with recycling.« less

  9. Reliability models: the influence of model specification in generation expansion planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, J.P.

    1982-10-01

    This paper is a critical evaluation of reliability methods used for generation expansion planning. It is shown that the methods for treating uncertainty are critical for determining the relative reliability value of expansion alternatives. It is also shown that the specification of the reliability model will not favor all expansion options equally. Consequently, the model is biased. In addition, reliability models should be augmented with an economic value of reliability (such as the cost of emergency procedures or energy not served). Generation expansion evaluations which ignore the economic value of excess reliability can be shown to be inconsistent. The conclusionsmore » are that, in general, a reliability model simplifies generation expansion planning evaluations. However, for a thorough analysis, the expansion options should be reviewed for candidates which may be unduly rejected because of the bias of the reliability model. And this implies that for a consistent formulation in an optimization framework, the reliability model should be replaced with a full economic optimization which includes the costs of emergency procedures and interruptions in the objective function.« less

  10. Regional Planning in California: Objectives, Obstacles, and Alternatives

    ERIC Educational Resources Information Center

    Deegan, William L.; Alford, Janis C.

    1976-01-01

    At the direction of the California State Legislature, the authors explored regional planning in other states as well as in California in an effort to determine the advantages and disadvantages of voluntary versus mandated interinstitutional cooperation. In this revised report the current state of regional planning and various alternatives for…

  11. 75 FR 54177 - Notice of Availability of the Draft Jarbidge Field Office Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... throughout the planning area. Alternative III focuses on restoring the resiliency of ecosystem structure and... planning area. Alternative IV focuses on actively restoring the resiliency of ecosystem structure and... Development. Sand Point ACEC (950 acres) Relevant and Important Values: Cultural, Geologic, Historic...

  12. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ...] General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area, New... (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the General Management Plan (GMP... alternatives to guide the management of the site over the next 20 years. The NPS preferred alternative...

  13. Tribal Energy Program for California Indian Tribes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singer, S.

    A strategic plan is needed to catalyze clean energy in the more than 100 California Indian tribal communities with varying needs and energy resources. We propose to conduct a scoping study to identify tribal lands with clean energy potential, as well as communities with lack of grid-tied energy and communications access. The research focus would evaluate the energy mixture and alternatives available to these tribal communities, and evaluate greenhouse gas emissions associated with accessing fossil fuel used for heat and power. Understanding the baseline of energy consumption and emissions of communities is needed to evaluate improvements and advances from technology.more » Based on this study, we will develop a strategic plan that assesses solutions to address high energy fuel costs due to lack of electricity access and inform actions to improve economic opportunities for tribes. This could include technical support for tribes to access clean energy technologies and supporting collaboration for on-site demonstrations.« less

  14. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  15. Conjoint analysis: a pragmatic approach for the accounting of multiple benefits in southern forest management

    Treesearch

    F. Christian Zinkhan; Thomas P. Holmes; D. Evan Mercer

    1994-01-01

    With conjoint analysis as its foundation, a practical approach for measuring the utility and dollar value of non-market outputs from southern forests is described and analyzed. The approach can be used in the process of evaluating alternative silvicultural and broader natural resource management plans when non-market as well as market outputs are recognized. When...

  16. Agile Port and High Speed Ship Technologies

    DTIC Science & Technology

    2009-12-31

    Alternative Shipboard Powering Systems for Naval and Regulatory Review • The Evaluation and Implementation Plan for Southern California Maglev ...Ackerman". CSULB Foundation Annual Report. CSULB Foundation, Long Beach, CA. December 2005. " Maglev Technology ’Conveys’ Port Transportation Solutions...34. Newsflash. College of Engineering, California State University, Long Beach. Cover page. Spring 2006 Hanson, Kristopher. "Engineers Tout Maglev at

  17. Assessing Pricing and Aid Strategies: Rethinking Planning and Evaluation Practices. AIR 1994 Annual Forum Paper.

    ERIC Educational Resources Information Center

    St. John, Edward P.

    This paper explores the need for a better understanding of the influences of prices and student aid on student enrollment and college budgets. The theory of net price has not been found to adequately explain changes in enrollment. Based on a critical review of recent research on student price response, this paper develops an alternative approach…

  18. Evaluating oilseed biofuel production feasibility in California's San Joaquin Valley using geophysical and remote sensing techniques

    USDA-ARS?s Scientific Manuscript database

    For strategic reasons alternative fuels, such as biofuel, will foreseeably continue to be a part of a planned US military goal that encompasses a wide and varied range of fuel sources in spite of their high cost. Though more costly than petroleum-based fuels and envisioned as a minor component of th...

  19. Planning and Evaluation Framework: A Five Year Program for the Department of Libraries, Commonwealth of Kentucky.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Libraries, Frankfort.

    This document is the beginning of a process. The objects of the process are to improve decisions between alternate choices in the development of statewide library services. Secondary functions are to develop the tools for providing information relevant to decisions, to measure and monitor services, and to aid in the communication process. The…

  20. 75 FR 22617 - Notice of Intent To Prepare an Environmental Assessment for Domestic Sheep Grazing on the Dog...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Intent To Prepare an Environmental Assessment for Domestic Sheep Grazing on the Dog Creek and Green Creek... that will evaluate a range of alternatives for grazing domestic sheep on the Dog Creek and Green Creek... to the Bishop RMP, and would therefore require a plan amendment. The Dog Creek allotment consists of...

  1. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  2. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  3. Cost-effectiveness of planned birth in a birth centre compared with alternative planned places of birth: results of the Dutch Birth Centre study

    PubMed Central

    Hermus, Marieke, MAA; Boesveld, Inge, IC; Franx, Arie; van der Pal-de Bruin, Karin, KM; Steegers, Eric, EAP; van den Akker-van Marle, EIske, ME

    2017-01-01

    Objectives To estimate the cost-effectiveness of a planned birth in a birth centre compared with alternative planned places of birth for low-risk women. In addition, a distinction has been made between different types of locations and integration profiles of birth centres. Design Economic evaluation based on a prospective cohort study. Setting 21 Dutch birth centres, 46 hospital locations where midwife-led birth was possible and 110 midwifery practices where home birth was possible. Participants 3455 low-risk women under the care of a community midwife at the start of labour in the Netherlands within the study period 1 July 2013 to 31 December 2013. Main outcome measures Costs and health outcomes of birth for different planned places of birth. Healthcare costs were measured from start of labour until 7 days after birth. The health outcomes were assessed by the Optimality Index-NL2015 (OI) and a composite adverse outcomes score. Results The total adjusted mean costs for births planned in a birth centre, in a hospital and at home under the care of a community midwife were €3327, €3330 and €2998, respectively. There was no difference between the score on the OI for women who planned to give birth in a birth centre and that of women who planned to give birth in a hospital. Women who planned to give birth at home had better outcomes on the OI (higher score on the OI). Conclusions We found no differences in costs and health outcomes for low-risk women under the care of a community midwife with a planned birth in a birth centre and in a hospital. For nulliparous and multiparous low-risk women, planned birth at home was the most cost-effective option compared with planned birth in a birth centre. PMID:28893750

  4. Cost-Benefit Analysis For Alternative Low-Emission Surface Preparation/ Depainting Technologies for Structural Steel

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2007-01-01

    Stennis Space Center (SSC), Kennedy Space Center (KSC) and Air Force Space Command (AFSPC) identified particulate emissions and waste generated from the depainting process of steel structures as hazardous materials to be eliminated or reduced. A Potential Alternatives Report, Potential Alternatives Report for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, provided a technical analyses of identified alternatives to the current coating removal processes, criteria used to select alternatives for further analysis, and a list of those alternatives recommended for testing. The initial coating removal alternatives list was compiled using literature searches and stakeholder recommendations. The involved project participants initially considered approximately 13 alternatives. In late 2003, core project members selected the following depainting processes to be further evaluated: (1) Plastic Blast Media-Quickstrip(R)-A. (2) Hard Abrasive-Steel-Magic(R). (3) Sponge Blasting-Sponge-Jet(R). (4) Liquid Nitrogen-NItroJet(R). (5) Mechanical Removal with Vacuum Attachment-DESCO and OCM Clean-Air (6) Laser Coating Removal Alternatives were tested in accordance with the Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Evaluation Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel. Results of the testing are documented in the Joint Test Report. This Cost-Benefit Analysis (CBA) focuses on the three alternatives (Quickstrip(R)-A, SteelMagic (R), and Sponge-Jet(R)) that were considered viable alternatives for large area operations based on the results of the field demonstration and lab testing. This CBA was created to help participants determine if implementation of the candidate alternatives is economically justified. Each of the alternatives examined reduced Environmental Activity (EA) Costs-those costs associated with complying with environmental regulations. One alternative, Steel-Magic(R), also showed reduced Direct Costs and reduced total costs.

  5. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  6. Developing a strategic marketing plan for physical and occupational therapy services: a collaborative project between a critical access hospital and a graduate program in health care management.

    PubMed

    Kash, Bita A; Deshmukh, A A

    2013-01-01

    The purpose of this study was to develop a marketing plan for the Physical and Occupational Therapy (PT/OT) department at a Critical Access Hospital (CAH). We took the approach of understanding and analyzing the rural community and health care environment, problems faced by the PT/OT department, and developing a strategic marketing plan to resolve those problems. We used hospital admissions data, public and physician surveys, a SWOT analysis, and tools to evaluate alternative strategies. Lack of awareness and negative perception were key issues. Recommended strategies included building relationships with physicians, partnering with the school district, and enhancing the wellness program.

  7. An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter. Volume 1; Executive Summary

    NASA Technical Reports Server (NTRS)

    Hays, D.

    1982-01-01

    Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

  8. Alternative Medications for Medications Included in the Use of High-Risk Medications in the Elderly and Potentially Harmful Drug–Disease Interactions in the Elderly Quality Measures

    PubMed Central

    Hanlon, Joseph T.; Semla, Todd P.; Schmader, Kenneth E.

    2016-01-01

    The National Committee for Quality Assurance (NCQA) and the Pharmacy Quality Alliance (PQA) use the American Geriatrics Society (AGS) Beers Criteria to designate the quality measure Use of High-Risk Medications in the Elderly (HRM). The Centers for Medicare and Medicaid Services (CMS) use the HRM measure to monitor and evaluate the quality of care provided to Medicare beneficiaries. NCQA additionally uses the AGS Beers Criteria to designate the quality measure Potentially Harmful Drug–Disease Interactions in the Elderly. Medications included in these measures may be harmful to elderly adults, negatively affect a health care plan’s quality ratings, and be denied as a health care plan drug benefit. Prescribers, pharmacists, patients, and health care plans may benefit from evidence-based alternative medication treatments to avoid these problems. Therefore the goal of this work was to develop a list of alternative medications to those included in the two measures. The authors conducted a comprehensive literature review for 2000 to 2014 and a search of their personal files. From the evidence, they prepared a list of drug-therapy alternatives with supporting references. A reference list of non-pharmacological approaches was also provided when appropriate. NCQA, PQA, the 2015 AGS Beers Criteria panel, and the Executive Committee of the AGS reviewed the drug therapy alternatives and nonpharmacological approaches. Recommendations by these groups were incorporated into the final list of alternatives. The final product of drug-therapy alternatives to medications included in the two quality measures and some nonpharmacological resources will be useful to health professionals, consumers, payers, and health systems that care for older adults. PMID:26447889

  9. A detailed evaluation of TomoDirect 3DCRT planning for whole-breast radiation therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fields, Emma C.; Rabinovitch, Rachel; Ryan, Nicole E.

    2013-01-01

    The goal of this work was to develop planning strategies for whole-breast radiotherapy (WBRT) using TomoDirect three-dimensional conformal radiation therapy (TD-3DCRT) and to compare TD-3DCRT with conventional 3DCRT and TD intensity-modulated radiation therapy (TD-IMRT) to evaluate differences in WBRT plan quality. Computed tomography (CT) images of 10 women were used to generate 150 WBRT plans, varying in target structures, field width (FW), pitch, and number of beams. Effects on target and external maximum doses (EMD), organ-at-risk (OAR) doses, and treatment time were assessed for each parameter to establish an optimal planning technique. Using this technique, TD-3DCRT plans were generated andmore » compared with TD-IMRT and standard 3DCRT plans. FW 5.0 cm with pitch = 0.250 cm significantly decreased EMD without increasing lung V20 Gy. Increasing number of beams from 2 to 6 and using an additional breast planning structure decreased EMD though increased lung V20 Gy. Changes in pitch had minimal effect on plan metrics. TD-3DCRT plans were subsequently generated using FW 5.0 cm, pitch = 0.250 cm, and 2 beams, with additional beams or planning structures added to decrease EMD when necessary. TD-3DCRT and TD-IMRT significantly decreased target maximum dose compared to standard 3DCRT. FW 5.0 cm with 2 to 6 beams or novel planning structures or both allow for TD-3DCRT WBRT plans with excellent target coverage and OAR doses. TD-3DCRT plans are comparable to plans generated using TD-IMRT and provide an alternative to conventional 3DCRT for WBRT.« less

  10. Program evaluation in integrated resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Council, C.D.

    1994-12-31

    The Western Area Power Administration along with the Southwestern and Southeastern Power Administrations joined together to develop a set of integrated resource planning (IRP) tools to help their customers development and implement an IRP process. The project has been entitled the Resource Planning Guide (RPG), and is specifically designed to help small- to mid-sized utilities analyze supply- and demand-side alternatives as part of an IRP process. The RPG project will be available in January 1994 and will include such support as: workshops, technical assistance, an RPG hotline, and an RPG User`s Group for the project. The RPG grew out ofmore » the interest shown by utility customers who wanted a user-friendly tool to aid in their application of the IRP process. The project has been field tested by 43 utilities and related organizations over the last year, has sparked interest both nationally and internationally, and is now available for public use. The program evaluation aspects of the IRP process are heightened by a requirement of the Energy Policy Act of 1992 which requires all long-term power customers of the Western Area Power Administration to develop, implement, and monitor an IRP process. The EPAct defines IRP as: A planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to its electric customers at the lowest system cost. The process takes into account necessary features for system operation, such as diversity, reliability, dispatchability, and other factors of risk; the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and treats demand and supply resources on a consistent and integrated basis.« less

  11. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  12. Risk analysis of computer system designs

    NASA Technical Reports Server (NTRS)

    Vallone, A.

    1981-01-01

    Adverse events during implementation can affect final capabilities, schedule and cost of a computer system even though the system was accurately designed and evaluated. Risk analysis enables the manager to forecast the impact of those events and to timely ask for design revisions or contingency plans before making any decision. This paper presents a structured procedure for an effective risk analysis. The procedure identifies the required activities, separates subjective assessments from objective evaluations, and defines a risk measure to determine the analysis results. The procedure is consistent with the system design evaluation and enables a meaningful comparison among alternative designs.

  13. Evaluation of Arizona Health Care Cost Containment System, 1984-85

    PubMed Central

    McCall, Nelda; Henton, Douglas; Haber, Susan; Paringer, Lynn; Crane, Michael; Wrightson, William; Freund, Deborah

    1987-01-01

    In this article, we describe the evaluation of the Arizona Health Care Cost Containment System (AHCCCS), Arizona's alternative to the acute care portion of Medicaid. We provide an assessment of implementation of the program's innovative features during its second 18 months of operation, from April 1984 through September 1985. Included in the evaluation are assessments of the administration of the program, provider relations, eligibility, enrollment and marketing, information systems, quality assurance and member satisfaction activities, the relationship of the county governments to AHCCCS, the competitive bidding process, and the plans and their financial status. PMID:10312395

  14. Autonomous Agents for Dynamic Process Planning in the Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Nik Nejad, Hossein Tehrani; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Rapid changes of market demands and pressures of competition require manufacturers to maintain highly flexible manufacturing systems to cope with a complex manufacturing environment. This paper deals with development of an agent-based architecture of dynamic systems for incremental process planning in the manufacturing systems. In consideration of alternative manufacturing processes and machine tools, the process plans and the schedules of the manufacturing resources are generated incrementally and dynamically. A negotiation protocol is discussed, in this paper, to generate suitable process plans for the target products real-timely and dynamically, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans are searched and generated to cope with both the dynamic changes of the product specifications and the disturbances of the manufacturing resources. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans in the dynamic manufacturing environment.

  15. Beam-specific planning volumes for scattered-proton lung radiotherapy

    NASA Astrophysics Data System (ADS)

    Flampouri, S.; Hoppe, B. S.; Slopsema, R. L.; Li, Z.

    2014-08-01

    This work describes the clinical implementation of a beam-specific planning treatment volume (bsPTV) calculation for lung cancer proton therapy and its integration into the treatment planning process. Uncertainties incorporated in the calculation of the bsPTV included setup errors, machine delivery variability, breathing effects, inherent proton range uncertainties and combinations of the above. Margins were added for translational and rotational setup errors and breathing motion variability during the course of treatment as well as for their effect on proton range of each treatment field. The effect of breathing motion and deformation on the proton range was calculated from 4D computed tomography data. Range uncertainties were considered taking into account the individual voxel HU uncertainty along each proton beamlet. Beam-specific treatment volumes generated for 12 patients were used: a) as planning targets, b) for routine plan evaluation, c) to aid beam angle selection and d) to create beam-specific margins for organs at risk to insure sparing. The alternative planning technique based on the bsPTVs produced similar target coverage as the conventional proton plans while better sparing the surrounding tissues. Conventional proton plans were evaluated by comparing the dose distributions per beam with the corresponding bsPTV. The bsPTV volume as a function of beam angle revealed some unexpected sources of uncertainty and could help the planner choose more robust beams. Beam-specific planning volume for the spinal cord was used for dose distribution shaping to ensure organ sparing laterally and distally to the beam.

  16. Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2005-01-01

    Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) A void duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and Air Force Space Command (AFSPC) installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Joint Test Protocol (JTP) contains the critical requirements and tests necessary to qualify alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel Applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of NASA and Air Force Space Command (AFSPC) participants. The Field Test Plan (FTP), entitled Joint Test Protocol for Validation of Alternative Low Emission Surface Preparation/Depainting Technologies for Structural Steel, prepared by ITB, defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP.

  17. TU-AB-BRB-03: Coverage-Based Treatment Planning to Accommodate Organ Deformable Motions and Contouring Uncertainties for Prostate Treatment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, H.

    The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less

  18. TU-AB-BRB-02: Stochastic Programming Methods for Handling Uncertainty and Motion in IMRT Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unkelbach, J.

    The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less

  19. Vibroacoustic test plan evaluation: Parameter variation study

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloef, H. R.

    1976-01-01

    Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.

  20. SU-E-P-12: Pinnacle-Based Tool to Evaluate the Effect of Prostate Rotation as Determined by Calypso

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Narayanan, S; Velasco-Schmitz, R; Claeys, K

    Purpose: When the Calypso reports a large prostate rotation and one does not have the means to make corrections, it is helpful to quantify its dosimetric effects. We have devised a simple scheme to achieve this in Pinnacle TPS. If it is determined that the PTV margin is inadequate, an alternate larger-margin plan may be adapted for the day. Methods: A three-step process using the Pinnacle Image fusion module was formulated to analyze the clinical effect of prostate rotation. The process includes (1) translating the image set such that the rotational axis is about the isocenter, (2) performing 3D rotationsmore » of the structures of interest, and (3) restoring the coordinates associated with the plan. The rotated structures are imported and overlayed on the original plan for evaluation. The tool was applied to three prostate cancer patients with relatively large rotations (95 fractions total). Prostate rotations are primarily due to variations in bladder and rectal filling, which may also affect the seminal vesicles. It is difficult to estimate the perturbation of seminal vesicles for a given prostate rotation. Therefore, the Calypso-derived rotation matrix was applied only to CTV and PTV (CTV+5mm). Results: The rotations were predominantly in the pitch direction with an absolute value ranging from 0–29 degrees (Median = 10°, Average = 14.5°). For various magnitudes of rotation, the CTV V100 decreased from the original 100% to 99.6%/99%/95% for 10°/15°/29° rotations, respectively. Likewise, the PTV V100 diminished from 95% to 92%/89%/82%. Conclusion: A tool, consisting only of features within a TPS, was used to evaluate the dosimetric effect of prostate rotation. Our study shows that under large uncorrected rotations, the tumor coverage is degraded and may require intervention in the form of plan adaptation. To this end, alternate plans with variable margins can be generated in advance for daily adaption.« less

  1. Towards an Improved Pilot-Vehicle Interface for Highly Automated Aircraft: Evaluation of the Haptic Flight Control System

    NASA Technical Reports Server (NTRS)

    Schutte, Paul; Goodrich, Kenneth; Williams, Ralph

    2012-01-01

    The control automation and interaction paradigm (e.g., manual, autopilot, flight management system) used on virtually all large highly automated aircraft has long been an exemplar of breakdowns in human factors and human-centered design. An alternative paradigm is the Haptic Flight Control System (HFCS) that is part of NASA Langley Research Center s Naturalistic Flight Deck Concept. The HFCS uses only stick and throttle for easily and intuitively controlling the actual flight of the aircraft without losing any of the efficiency and operational benefits of the current paradigm. Initial prototypes of the HFCS are being evaluated and this paper describes one such evaluation. In this evaluation we examined claims regarding improved situation awareness, appropriate workload, graceful degradation, and improved pilot acceptance. Twenty-four instrument-rated pilots were instructed to plan and fly four different flights in a fictitious airspace using a moderate fidelity desktop simulation. Three different flight control paradigms were tested: Manual control, Full Automation control, and a simplified version of the HFCS. Dependent variables included both subjective (questionnaire) and objective (SAGAT) measures of situation awareness, workload (NASA-TLX), secondary task performance, time to recognize automation failures, and pilot preference (questionnaire). The results showed a statistically significant advantage for the HFCS in a number of measures. Results that were not statistically significant still favored the HFCS. The results suggest that the HFCS does offer an attractive and viable alternative to the tactical components of today s FMS/autopilot control system. The paper describes further studies that are planned to continue to evaluate the HFCS.

  2. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  3. Evaluating Landscape Options for Corridor Restoration between Giant Panda Reserves

    PubMed Central

    Wang, Fang; McShea, William J.; Wang, Dajun; Li, Sheng; Zhao, Qing; Wang, Hao; Lu, Zhi

    2014-01-01

    The establishment of corridors can offset the negative effects of habitat fragmentation by connecting isolated habitat patches. However, the practical value of corridor planning is minimal if corridor identification is not based on reliable quantitative information about species-environment relationships. An example of this need for quantitative information is planning for giant panda conservation. Although the species has been the focus of intense conservation efforts for decades, most corridor projects remain hypothetical due to the lack of reliable quantitative researches at an appropriate spatial scale. In this paper, we evaluated a framework for giant panda forest corridor planning. We linked our field survey data with satellite imagery, and conducted species occupancy modelling to examine the habitat use of giant panda within the potential corridor area. We then conducted least-cost and circuit models to identify potential paths of dispersal across the landscape, and compared the predicted cost under current conditions and alternative conservation management options considered during corridor planning. We found that due to giant panda's association with areas of low elevation and flat terrain, human infrastructures in the same area have resulted in corridor fragmentation. We then identified areas with high potential to function as movement corridors, and our analysis of alternative conservation scenarios showed that both forest/bamboo restoration and automobile tunnel construction would significantly improve the effectiveness of corridor, while residence relocation would not significantly improve corridor effectiveness in comparison with the current condition. The framework has general value in any conservation activities that anticipate improving habitat connectivity in human modified landscapes. Specifically, our study suggested that, in this landscape, automobile tunnels are the best means to remove current barriers to giant panda movements caused by anthropogenic interferences. PMID:25133757

  4. Evaluating landscape options for corridor restoration between giant panda reserves.

    PubMed

    Wang, Fang; McShea, William J; Wang, Dajun; Li, Sheng; Zhao, Qing; Wang, Hao; Lu, Zhi

    2014-01-01

    The establishment of corridors can offset the negative effects of habitat fragmentation by connecting isolated habitat patches. However, the practical value of corridor planning is minimal if corridor identification is not based on reliable quantitative information about species-environment relationships. An example of this need for quantitative information is planning for giant panda conservation. Although the species has been the focus of intense conservation efforts for decades, most corridor projects remain hypothetical due to the lack of reliable quantitative researches at an appropriate spatial scale. In this paper, we evaluated a framework for giant panda forest corridor planning. We linked our field survey data with satellite imagery, and conducted species occupancy modelling to examine the habitat use of giant panda within the potential corridor area. We then conducted least-cost and circuit models to identify potential paths of dispersal across the landscape, and compared the predicted cost under current conditions and alternative conservation management options considered during corridor planning. We found that due to giant panda's association with areas of low elevation and flat terrain, human infrastructures in the same area have resulted in corridor fragmentation. We then identified areas with high potential to function as movement corridors, and our analysis of alternative conservation scenarios showed that both forest/bamboo restoration and automobile tunnel construction would significantly improve the effectiveness of corridor, while residence relocation would not significantly improve corridor effectiveness in comparison with the current condition. The framework has general value in any conservation activities that anticipate improving habitat connectivity in human modified landscapes. Specifically, our study suggested that, in this landscape, automobile tunnels are the best means to remove current barriers to giant panda movements caused by anthropogenic interferences.

  5. OTEC modular experiment cold water pipe concept evaluation. Volume III. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-04-01

    The Cold Water Pipe System Design Study was undertaken to evaluate the diverse CWP concepts, recommend the most viable alternatives for a 1984 deployment of the 10 to 40 MWe MEP, and carry out preliminary designs of three concepts. The concept evaluation phase reported involved a systems analysis of design alternatives in the broad categories of rigid walled (with hinges), compliant walled, stockade and bottom mounted buoyant. Quantitative evaluations were made of concept performance, availability, deployment schedule, technical feasibility and cost. CWP concepts were analyzed to determine if they met or could be made to meet established system requirements andmore » could be deployed by 1984. Fabrication, construction and installation plans were developed for successful concepts, and costs were determined in a WBS format. Evaluations were performed on the basis of technical and cost risk. This volume includes the following appendices: (A) materials and associated design criteria; (B) summary of results of dynamic flow and transportation analysis; (C) CWP sizing analysis; (D) CWP thermal performance; and (E) investigation of the APL/ABAM CWP design. (WHK)« less

  6. TU-AB-BRB-00: New Methods to Ensure Target Coverage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2015-06-15

    The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less

  7. SU-F-J-91: Sparing Lung Function in Treatment Planning Using Dual Energy Tomography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lapointe, A; Bahig, H; Zerouali, K

    2016-06-15

    Purpose: To propose an alternate treatment plan that minimizes the dose to the functional lung tissues. In clinical situation, the evaluation of the lung functionality is typically derived from perfusion scintigraphy. However, such technique has spatial and temporal resolutions generally inferior to those of a CT scan. Alternatively, it is possible to evaluate pulmonary function by analysing the iodine concentration determined via contrast-enhanced dual energy CT (DECT) scan. Methods: Five lung cancer patients underwent a scintigraphy and a contrast-enhanced DECT scan (SOMATOM Definition Flash, Siemens). The iodine concentration was evaluated using the two-material decomposition method to produce a functional mapmore » of the lung. The validation of the approach is realized by comparison between the differential function computed by DECT and scintigraphy. The functional map is then used to redefine the V5 (volume of the organ that received more than 5 Gy during a radiotherapy treatment) to a novel functional parameter, the V5f. The V5f, that uses a volume weighted by its function level, can assist in evaluating optimal beam entry points for a specific treatment plan. Results: The results show that the differential functions obtained by scintigraphy and DECT are in good agreement with a mean difference of 6%. In specific cases, we are able to visually correlate low iodine concentration with abnormal pulmonary lung or cancerous tumors. The comparison between V5f and V5 has shown that some entry points can be better exploited and that new ones are now accessible, 2.34 times more in average, without increasing the V5f - thus allowing easier optimization of other planning objectives. Conclusion: In addition to the high-resolution DECT images, the iodine map provides local information used to detect potential functional heterogeneities in the 3D space. We propose that this information be used to calculate new functional dose parameters such as the V5f. The presenting author, Andreanne Lapointe, received a canadian scholarship from MITACS. Part of the funding is from the compagny Siemens.« less

  8. How to do what you want to do with your old business car.

    PubMed

    1994-01-01

    Before you get your new car, you need to think about your old car. What do you want to do with it? What are the tax consequences? What are the tax benefits of the alternatives? Also, you need to know your basis so that you can evaluate the alternatives. Planning Tip. Find out your car's adjusted basis today! If basis is high and fair market value is low, sell the car, deduct the loss, and pocket the cash. If basis is low and fair market value is high, avoid tax! Trade in your old car on the purchase of the new car.

  9. Mystic mountain: an educational alternative futures wildland planning game

    Treesearch

    Edward C. Thor; James L. Creighton

    1978-01-01

    Alternative futures planning is a generic name for a number of planning approaches which recognize that the future is uncertain. There is not one future, preordained and universally known, but rather a variety of possible futures, any one of which may occur. Mystic Mountain is an educational game which teaches wildland planners and managers important concepts in...

  10. 75 FR 30100 - FY 2010 Discretionary Livability Funding Opportunity: Alternatives Analysis Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ..., Alternatives Analysis Program, Office of Planning and Environment, by phone at (202) 493-0512 or by e-mail at... transportation planning process which includes: (1) An assessment of a wide range of public transportation... descriptions of the documents produced, can be found on FTA's Web site at http://www.fta.dot.gov/planning...

  11. Influence of forest planning alternatives on landscape pattern and ecosystem processes in northern Wisconsin, USA

    Treesearch

    Patrick A. Zollner; L. Jay Roberts; Eric J. Gustafson; Hong S. He; Volker Radeloff

    2008-01-01

    Incorporating an ecosystem management perspective into forest planning requires consideration of the impacts of timber management on a suite of landscape characteristics at broad spatial and long temporal scales. We used the LANDIS forest landscape simulation model to predict forest composition and landscape pattern under seven alternative forest management plans...

  12. I Read it on the Computer, It Must Be True--Evaluating Information from the Web.

    ERIC Educational Resources Information Center

    Marcovitz, David M.

    1997-01-01

    Presents a lesson plan that exposes students to a variety of information sources on the World Wide Web to teach them to begin to be critical consumers of information. Students are divided into groups and given Web addresses for an organization with a strong view on Nazism. Discusses alternate and follow-up lessons and student reactions. Lists Web…

  13. Preliminary definition and evaluation of advanced space concepts. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Bekey, I.

    1978-01-01

    A study was made to develop the characteristics, cost, and performance of a few of the more attractive application concepts, and to compare them against leading terrestrial alternatives, in order to determine their potential, identify those deserving further NASA attention and possible inclusion into the formal development planning sequence, and serve to initiate a dialogue with the using community and agencies.

  14. An Analysis of Factors that Influence the Success of Expeditionary Civil Engineer Hub-and-spoke Organizations

    DTIC Science & Technology

    2013-03-01

    planning tools, expeditionary airbase location optimization, knowledge transfer at deployment rotation turnover, exercises and evaluations, and others...laying airfield matting  Constructing earth berms and dikes for fuel bladders or unsheltered aircraft  Modifying existing facilities for alternate...Providing all essential utilities  Constructing earth berms and access roads for bomb dumps  Constructing communication tower foundations

  15. National Voice Response System (VRS) Implementation Plan Alternatives Study

    DOT National Transportation Integrated Search

    1979-07-01

    This study examines the alternatives available to implement a national Voice Response System (VRS) for automated preflight weather briefings and flight plan filing. Four major hardware configurations are discussed. A computerized analysis model was d...

  16. Roosevelt-Vanderbilt alternative transportation system planning study : phase 1

    DOT National Transportation Integrated Search

    2001-08-01

    This plan identifies components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is to reduce the congestion ...

  17. Alternatives to Certain Phthalates Partnership

    EPA Pesticide Factsheets

    The alternatives assessment partnership project on alternatives to certain phthalates seeks to eplore the human health and environmental profiles of eight action plan phthalates and functional alternatives

  18. 29 CFR 4044.73 - Lump sums and other alternative forms of distribution in lieu of annuities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... distribution is the present value of the normal form of benefit provided by the plan payable at normal... 29 Labor 9 2010-07-01 2010-07-01 false Lump sums and other alternative forms of distribution in... Benefits and Assets Non-Trusteed Plans § 4044.73 Lump sums and other alternative forms of distribution in...

  19. Social impact evaluation: Some implications of the specific decisional context approach for Anticipatory Project Assessment (ARA)

    NASA Technical Reports Server (NTRS)

    Mayo, L. H.

    1975-01-01

    An anticipatory project assessment is discussed which is characterized as the capacity to perform, and the disposition to take into account in relevant decisional areas, the following operations: identification of the significant effects which will result from the introduction of a specified project configuration into alternative projected future social environments during the planning, implementation, and operational states; evaluation of such effects in terms of social impacts on affected participants and social value-institutional processes in accord with specified concepts of social justice.

  20. Considering high occupancy vehicle alternatives in the urban transportation planning process: energy savings. Final report, August 1981-October 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, M.J.; Wickstrom, G.V.

    1983-10-01

    Preferred treatment of high occupancy vehicles (HOV's), through strategies such as dedicated lanes, can achieve transportation energy conservation. The research presented in this report provides a method for regional planning agencies to assess such HOV facilities, from a travel demand and energy consumption standpoint. The planning process is described and applied in a case study. Products of the case study included estimates of carpool formation and associated fuel savings, and traffic operations on HOV and other facilities in the corridor. The completed process represents a method to examine HOV's under a variety of policy and operational conditions. The process ismore » within the modeling capabilities of other Metropolitan Planning Organizations (MPO's) and should be transferable to other cities and corridors. Additional applications of the HOV estimation and evaluation process are recommended.« less

  1. [Relationship between water supply, sanitation, public health, and environment: elements for the formulation of a sanitary infrastructure planning model].

    PubMed

    Soares, Sérgio R A; Bernardes, Ricardo S; Netto, Oscar de M Cordeiro

    2002-01-01

    The understanding of sanitation infrastructure, public health, and environmental relations is a fundamental assumption for planning sanitation infrastructure in urban areas. This article thus suggests elements for developing a planning model for sanitation infrastructure. The authors performed a historical survey of environmental and public health issues related to the sector, an analysis of the conceptual frameworks involving public health and sanitation systems, and a systematization of the various effects that water supply and sanitation have on public health and the environment. Evaluation of these effects should guarantee the correct analysis of possible alternatives, deal with environmental and public health objectives (the main purpose of sanitation infrastructure), and provide the most reasonable indication of actions. The suggested systematization of the sanitation systems effects in each step of their implementation is an advance considering the association between the fundamental elements for formulating a planning model for sanitation infrastructure.

  2. Finding theory- and evidence-based alternatives to fear appeals: Intervention Mapping.

    PubMed

    Kok, Gerjo; Bartholomew, L Kay; Parcel, Guy S; Gottlieb, Nell H; Fernández, María E

    2014-04-01

    Fear arousal-vividly showing people the negative health consequences of life-endangering behaviors-is popular as a method to raise awareness of risk behaviors and to change them into health-promoting behaviors. However, most data suggest that, under conditions of low efficacy, the resulting reaction will be defensive. Instead of applying fear appeals, health promoters should identify effective alternatives to fear arousal by carefully developing theory- and evidence-based programs. The Intervention Mapping (IM) protocol helps program planners to optimize chances for effectiveness. IM describes the intervention development process in six steps: (1) assessing the problem and community capacities, (2) specifying program objectives, (3) selecting theory-based intervention methods and practical applications, (4) designing and organizing the program, (5) planning, adoption, and implementation, and (6) developing an evaluation plan. Authors who used IM indicated that it helped in bringing the development of interventions to a higher level. © 2013 The Authors. International Journal of Psychology published by John Wiley © Sons Ltd on behalf of International Union of Psychological Science.

  3. Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Poeschel, R. L.; Hawthorne, E. I.

    1977-01-01

    Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.

  4. Chapter 13 Application of landscape and habitat suitability models to conservation: the Hoosier National Forest land-management plan

    Treesearch

    Chadwick D. Rittenhouse; Stephen R. Shifley; William D. Dijak; Zhaofei Fan; Frank R., III Thompson; Joshua J. Millspaugh; Judith A. Perez; Cynthia M. Sandeno

    2011-01-01

    We demonstrate an approach to integrated land-management planning and quantify differences in vegetation and avian habitat conditions among 5 management alternatives as part of the Hoosier National Forest planning process. The alternatives differed in terms of the type, extent, magnitude, frequency, and location of management activities. We modeled ecological processes...

  5. Roosevelt-Vanderbilt alternative transportation system implementation plan : phase 2

    DOT National Transportation Integrated Search

    2004-12-01

    This is the second phase of a plan to identify components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is...

  6. Coal gasification systems engineering and analysis. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

  7. Fossil Energy Planning for Navajo Nation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acedo, Margarita

    This project includes fossil energy transition planning to find optimal solutions that benefit the Navajo Nation and stakeholders. The majority of the tribe’s budget currently comes from fossil energy-revenue. The purpose of this work is to assess potential alternative energy resources including solar photovoltaics and biomass (microalgae for either biofuel or food consumption). This includes evaluating carbon-based reserves related to the tribe’s resources including CO 2 emissions for the Four Corners generating station. The methodology for this analysis will consist of data collection from publicly available data, utilizing expertise from national laboratories and academics, and evaluating economic, health, and environmentalmore » impacts. Finally, this report will highlight areas of opportunities to implement renewable energy in the Navajo Nation by presenting the technology requirements, cost, and considerations to energy, water, and environment in an educational structure.« less

  8. TU-E-BRB-08: Dual Gated Volumetric Modulated Arc Therapy.

    PubMed

    Wu, J; Fahimian, B; Wu, H; Xing, L

    2012-06-01

    Gated Volumetric Modulated Arc Therapy (VMAT) is an emerging treatment modality for Stereotactic Body Radiotherapy (SBRT). However, gating significantly prolongs treatment time. In order to enhance treatment efficiency, a novel dual gated VMAT, in which dynamic arc deliveries are executed sequentially in alternating exhale and inhale phases, is proposed and evaluated experimentally. The essence of dual gated VMAT is to take advantage of the natural pauses that occur at inspiration and exhalation by alternatively delivering the dose at the two phases, instead of the exhale window only. The arc deliveries at the two phases are realized by rotating gantry forward at the exhale window and backward at the inhale in an alternative fashion. Custom XML scripts were developed in Varian's TrueBeam STx Developer Mode to enable dual gated VMAT delivery. RapidArc plans for a lung case were generated for both inhale and exhale phases. The two plans were then combined into a dual gated arc by interleaving the arc treatment nodes of the two RapidArc plans. The dual gated plan was delivered in the development mode of TrueBeam LINAC onto a motion phantom and the delivery was measured by using pinpoint chamber/film/diode array (delta 4). The measured dose distribution was compared with that computed using Eclipse AAA algorithm. The treatment delivery time was recorded and compared with the corresponding single gated plans. Relative to the corresponding single gated delivery, it was found that treatment time efficiency was improved by 95.5% for the case studied here. Pinpoint chamber absolute dose measurement agreed the calculation to within 0.7%. Diode chamber array measurements revealed that 97.5% of measurement points of dual gated RapidArc delivery passed the 3% and 3mm gamma-test criterion. A dual gated VMAT treatment has been developed and implemented successfully with nearly doubled treatment delivery efficiency. © 2012 American Association of Physicists in Medicine.

  9. 77 FR 12323 - Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ...Pursuant to 42 U.S.C. 4332(2)(C) of the National Environmental Policy Act of 1969 and National Park Service (NPS) policy in Director's Order Number 2 (Park Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and Decision- making) the NPS announces the availability of a DEIS/GMP for Buck Island Reef National Monument, Virgin Islands. The document provides a framework for management, use, and development options for Buck Island Reef National Monument by the NPS for the next 15 to 20 years. It describes four management alternatives for consideration, including a No-Action Alternative that continues current management policies and the NPS's preferred alternative. The document analyzes the environmental impacts of the alternatives.

  10. Incorporating ecosystem function concept in environmental planning and decision making by means of multi-criteria evaluation: the case-study of Kalloni, Lesbos, Greece.

    PubMed

    Oikonomou, Vera; Dimitrakopoulos, Panayiotis G; Troumbis, Andreas Y

    2011-01-01

    Nature provides life-support services which do not merely constitute the basis for ecosystem integrity but also benefit human societies. The importance of such multiple outputs is often ignored or underestimated in environmental planning and decision making. The economic valuation of ecosystem functions or services has been widely used to make these benefits economically visible and thus address this deficiency. Alternatively, the relative importance of the components of ecosystem value can be identified and compared by means of multi-criteria evaluation. Hereupon, this article proposes a conceptual framework that couples ecosystem function analysis, multi criteria evaluation and social research methodologies for introducing an ecosystem function-based planning and management approach. The framework consists of five steps providing the structure of a participative decision making process which is then tested and ratified, by applying the discrete multi-criteria method NAIADE, in the Kalloni Natura 2000 site, on Lesbos, Greece. Three scenarios were developed and evaluated with regard to their impacts on the different types of ecosystem functions and the social actors' value judgements. A conflict analysis permitted the better elaboration of the different views, outlining the coalitions formed in the local community and shaping the way towards reaching a consensus.

  11. Incorporating Ecosystem Function Concept in Environmental Planning and Decision Making by Means of Multi-Criteria Evaluation: The Case-Study of Kalloni, Lesbos, Greece

    NASA Astrophysics Data System (ADS)

    Oikonomou, Vera; Dimitrakopoulos, Panayiotis G.; Troumbis, Andreas Y.

    2011-01-01

    Nature provides life-support services which do not merely constitute the basis for ecosystem integrity but also benefit human societies. The importance of such multiple outputs is often ignored or underestimated in environmental planning and decision making. The economic valuation of ecosystem functions or services has been widely used to make these benefits economically visible and thus address this deficiency. Alternatively, the relative importance of the components of ecosystem value can be identified and compared by means of multi-criteria evaluation. Hereupon, this article proposes a conceptual framework that couples ecosystem function analysis, multi criteria evaluation and social research methodologies for introducing an ecosystem function-based planning and management approach. The framework consists of five steps providing the structure of a participative decision making process which is then tested and ratified, by applying the discrete multi-criteria method NAIADE, in the Kalloni Natura 2000 site, on Lesbos, Greece. Three scenarios were developed and evaluated with regard to their impacts on the different types of ecosystem functions and the social actors' value judgements. A conflict analysis permitted the better elaboration of the different views, outlining the coalitions formed in the local community and shaping the way towards reaching a consensus.

  12. Seizure Action Plans Do Not Reduce Health Care Utilization in Pediatric Epilepsy Patients.

    PubMed

    Roundy, Lindsi M; Filloux, Francis M; Kerr, Lynne; Rimer, Alyssa; Bonkowsky, Joshua L

    2016-03-01

    Management of pediatric epilepsy requires complex coordination of care. We hypothesized that an improved seizure management care plan would reduce health care utilization and improve outcomes. The authors conducted a cohort study with historical controls of 120 epilepsy patients before and after implementation of a "Seizure Action Plan." The authors evaluated for differences in health care utilization including emergency department visits, hospitalizations, clinic visits, telephone calls, and the percentage of emergency department visits that resulted in hospitalization in patients who did or did not have a Seizure Action Plan. The authors found that there was no decrease in these measures of health care utilization, and in fact the number of follow-up clinic visits was increased in the group with Seizure Action Plans (4.2 vs 3.3, P = .006). However, the study was underpowered to detect smaller differences. This study suggests that pediatric epilepsy quality improvement measures may require alternative approaches to reduce health care utilization and improve outcomes. © The Author(s) 2015.

  13. Seizure Action Plans Do Not Reduce Health Care Utilization in Pediatric Epilepsy Patients

    PubMed Central

    Roundy, Lindsi M.; Filloux, Francis M.; Kerr, Lynne; Rimer, Alyssa; Bonkowsky, Joshua L.

    2015-01-01

    Management of pediatric epilepsy requires complex coordination of care. We hypothesized that an improved seizure management care plan would reduce healthcare utilization and improve outcomes. We conducted a cohort study with historical controls of 120 epilepsy patients before and after implementation of a “Seizure Action Plan.” We evaluated for differences in healthcare utilization including emergency department visits, hospitalizations, clinic visits, telephone calls, and the percentage of emergency department visits that resulted in hospitalization in patients who did or did not have a Seizure Action Plan. We found that there was no decrease in these measures of healthcare utilization, and in fact the number of follow-up clinic visits was increased in the group with Seizure Action Plans (4.2 versus 3.3, p 0.006). However, the study was underpowered to detect smaller differences. Our study suggests that pediatric epilepsy quality improvement measures may require alternative approaches to reduce healthcare utilization and improve outcomes. PMID:26245799

  14. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.

  15. Development of an Experiment High Performance Nozzle Research Program

    NASA Technical Reports Server (NTRS)

    2004-01-01

    As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).

  16. Selection and Evaluation of Priority Domains in Global Energy Internet Standard Development Based on Technology Foresight

    NASA Astrophysics Data System (ADS)

    Jin, Yang; Ciwei, Gao; Jing, Zhang; Min, Sun; Jie, Yu

    2017-05-01

    The selection and evaluation of priority domains in Global Energy Internet standard development will help to break through limits of national investment, thus priority will be given to standardizing technical areas with highest urgency and feasibility. Therefore, in this paper, the process of Delphi survey based on technology foresight is put forward, the evaluation index system of priority domains is established, and the index calculation method is determined. Afterwards, statistical method is used to evaluate the alternative domains. Finally the top four priority domains are determined as follows: Interconnected Network Planning and Simulation Analysis, Interconnected Network Safety Control and Protection, Intelligent Power Transmission and Transformation, and Internet of Things.

  17. Medicare Part D Beneficiaries' Plan Switching Decisions and Information Processing.

    PubMed

    Han, Jayoung; Urmie, Julie

    2017-03-01

    Medicare Part D beneficiaries tend not to switch plans despite the government's efforts to engage beneficiaries in the plan switching process. Understanding current and alternative plan features is a necessary step to make informed plan switching decisions. This study explored beneficiaries' plan switching using a mixed-methods approach, with a focus on the concept of information processing. We found large variation in beneficiary comprehension of plan information among both switchers and nonswitchers. Knowledge about alternative plans was especially poor, with only about half of switchers and 2 in 10 nonswitchers being well informed about plans other than their current plan. We also found that helpers had a prominent role in plan decision making-nearly twice as many switchers as nonswitchers worked with helpers for their plan selection. Our study suggests that easier access to helpers as well as helpers' extensive involvement in the decision-making process promote informed plan switching decisions.

  18. Right service, right place: optimising utilisation of a community nursing service to reduce planned re-presentations to the emergency department

    PubMed Central

    Lawton, Jessica Kirsten; Kinsman, Leigh; Dalton, Lisa; Walsh, Fay; Bryan, Helen; Williams, Sharon

    2017-01-01

    Background Congruent with international rising emergency department (ED) demand, a focus on strategies and services to reduce burden on EDs and improve patient outcomes is necessary. Planned re-presentations of non-urgent patients at a regional Australian hospital exceeded 1200 visits during the 2013–2014 financial year. Planned re-presentations perpetuate demand and signify a lack of alternative services for non-urgent patients. The Community Nursing Enhanced Connections Service (CoNECS) collaboratively evolved between acute care and community services in 2014 to reduce planned ED re-presentations. Objective This study aimed to investigate the evolution and impact of a community nursing service to reduce planned re-presentations to a regional Australian ED and identify enablers and barriers to interventionist effectiveness. Methods A mixed-methods approach evaluated the impact of CoNECS. Data from hospital databases including measured numbers of planned ED re-presentations by month, time of day, age, gender and reason were used to calculate referral rates to CoNECS. These results informed two semistructured focus groups with ED and community nurses. The researchers used a theoretical lens, ‘diffusion of innovation’, to understand how this service could inform future interventions. Results Analyses showed that annual ED planned re-presentations decreased by 43% (527 presentations) after implementation. Three themes emerged from the focus groups. These were right service at the right time, nursing uncertainty and system disconnect and medical disengagement. Conclusions CoNECS reduced overall ED planned re-presentations and was sustained longer than many complex service-level interventions. Factors supporting the service were endorsement from senior administration and strong leadership to drive responsive quality improvement strategies. This study identified a promising alternative service outside the ED, highlighting possibilities for other hospital emergency services aiming to reduce planned re-presentations. PMID:29450293

  19. A stirling engine computer model for performance calculations

    NASA Technical Reports Server (NTRS)

    Tew, R.; Jefferies, K.; Miao, D.

    1978-01-01

    To support the development of the Stirling engine as a possible alternative to the automobile spark-ignition engine, the thermodynamic characteristics of the Stirling engine were analyzed and modeled on a computer. The modeling techniques used are presented. The performance of an existing rhombic-drive Stirling engine was simulated by use of this computer program, and some typical results are presented. Engine tests are planned in order to evaluate this model.

  20. Marketing the gastrointestinal practice: strategic considerations.

    PubMed

    Berkowitz, Eric N

    2006-10-01

    The health care marketplace is changing rapidly with increasing competition, changing reimbursement, and greater shifting of cost to patients making them more price sensitive. To be financially viable, the successful gastrointestinal practice must be more market responsive in its approach to planning, develop a unique advantage that will be of value to referral sources, and understand how customers evaluate alternative competing practices. This article focuses on these elements of practice success.

  1. Modeling of reservoir compaction and surface subsidence at South Belridge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, K.S.; Chan, C.K.; Prats, M.

    1995-08-01

    Finite-element models of depletion-induced reservoir compaction and surface subsidence have been calibrated with observed subsidence, locations of surface fissures, and regions of subsurface casing damage at South Belridge and used predictively for the evaluation of alternative reservoir-development plans. Pressure maintenance through diatomite waterflooding appears to be a beneficial means of minimizing additional subsidence and fissuring as well as reducing axial-compressive-type casing damage.

  2. Corrective Action Investigation Plan for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less

  3. Governors Island alternative transportation study : support to general management plan

    DOT National Transportation Integrated Search

    2004-12-01

    This report, funded by the NPS Alternative Transportation Program (ATP), was commissioned in conjunction with the GMP. As a high-level transportation study, it was intended to inform the GMP planning process and to aid in the conception and developme...

  4. Family Planning Education and Health Care Delivery in the People's Republic of China: Implications for Educational Alternatives

    ERIC Educational Resources Information Center

    Hawkins, John N.

    1976-01-01

    Explores the process recently employed in China (post-1966) to transfer skills and information related to family planning via a network of alternative educational institutions lodged in the health care delivery system. (Author/RK)

  5. The Evaluation of Cone Capsule as an Alternative Hull form for Portable Tsunami Lifeboat to Support Evacuation System in the Coastal Regions and Small Islands

    NASA Astrophysics Data System (ADS)

    Fauzan Zakki, Ahmad; Suharto; Windyandari, Aulia

    2018-03-01

    Several attempts have been made to reduce the risk of tsunami disasters such as the development of early warning systems, evacuation procedures training, coastal protection and coastal spatial planning. Although many efforts to mitigate the impact of the tsunami in Indonesia was made, no one has developed a portable disaster rescue vehicle/shelter as well as a lifeboat on ships and offshore building, which is always available when a disaster occurs. The aim of the paper is to evaluate the performance of cone capsule shaped hull form that would be used for the portable tsunami lifeboat. The investigation of the boat resistance, intact stability, and seakeeping characteristics was made. The numerical analysis results indicate that the cone capsule is reliable as an alternative hull form for the portable tsunami lifeboat.

  6. Radiation dermatitis caused by a bolus effect from an abdominal compression device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Michael; Wei, Randy L.; Yu, Suhong

    American Association of Physicists in Medicine (AAPM) Task Group 176 evaluated the dosimetric effects caused by couch tops and immobilization devices. The report analyzed the extensive physics-based literature on couch tops, stereotactic body radiation therapy (SBRT) frames, and body immobilization bags, while noting the scarcity of clinical reports of skin toxicity because of external devices. Here, we present a clinical case report of grade 1 abdominal skin toxicity owing to an abdominal compression device. We discuss the dosimetric implications of the utilized treatment plan as well as post hoc alternative plans and quantify differences in attenuation and skin dose/build-up betweenmore » the device, a lower-density alternative device, and an open field. The description of the case includes a 66-year-old male with HER2 amplified poorly differentiated distal esophageal adenocarcinoma treated with neoadjuvant chemo-radiation and the use of an abdominal compression device. Radiation was delivered using volumetric modulated arc therapy (VMAT) with 2 arcs using abdominal compression and image guidance. The total dose was 50.4 Gy delivered over 40 elapsed days. With 2 fractions remaining, the patient developed dermatitis in the area of the compression device. The original treatment plan did not include a contour of the device. Alternative post hoc treatment plans were generated, one to contour the device and a second with anterior avoidance. In conclusion, replanning with the device contoured revealed the bolus effect. The skin dose increased from 27 to 36 Gy. planned target volume (PTV) coverage at 45 Gy was reduced to 76.5% from 95.8%. The second VMAT treatment plan with an anterior avoidance sector and more oblique beam angles maintained PTV coverage and spared the anterior wall, however at the expense of substantially increased dose to lung. This case report provides an important reminder of the bolus effect from external devices such as abdominal compression. Special consideration must be given to contour and/or avoiding beam entrance to the device, and to the use of such devices in patients who may have heightened radiosensitivity, such as those who are human immunodeficiency virus (HIV)–positive.« less

  7. Task 1 Report - Assessment of Data Availability to Inform Energy Planning Analyses: Energy Alternatives Study for the Lao People's Democratic Republic: Smart Infrastructure for the Mekong Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Lopez, Anthony J.; Katz, Jessica R.

    In an effort to address concerns such as energy security, reliability, affordability, and other objectives, the Government of the Lao People's Democratic Republic (Lao PDR) is seeking to advance its expertise and experience in energy system analysis and planning to explore energy alternatives. Assessing the potential and alternatives for deploying energy technology options is often an early step - and, in most cases, an ongoing process - in planning for the development of the energy sector as a whole. Reliable and robust data are crucial to conducting these types of planning-related analyses in a transparent manner that builds confidence amongmore » power sector stakeholders and encourages investment in future energy project development and infrastructure opportunities. This report represents the first output of the Energy Alternatives Study for the Lao PDR (Energy Alternatives Study), a collaboration between Ministry of Energy and Mines and the United States Agency for International Development (USAID) under the auspices of the Smart Infrastructure for the Mekong (SIM) program. The Energy Alternatives Study includes five tasks that build upon each other to meet the goal of the project. The report summarizes the availability, quality, and accessibility of data that serve as key inputs to energy planning activities for the power sector. The purpose of this data assessment is two-fold: 1. To facilitate the informed use of existing data by highlighting applications for these data as they relate to priority energy planning analyses; and 2. To inform future investments in energy data collection and management by identifying significant data gaps and providing guidance on how to fill these gaps.« less

  8. ZBB--a new skill for the financial manager.

    PubMed

    Thompson, G B; Pyhrr, P A

    1979-03-01

    Zero-based budgeting (ZBB) is a management decision-making tool currently gaining wide acceptance. ZBB is a budgeting approach which is useful for planning, controlling and coordinating financial and human resources. It involves the re-evaluation of all budgeted activities in terms of priorities established by the management. The traditional process of incremental budgeting differs from ZBB in that only the planned changes are evaluated in the former. In incremental budgeting, the base budget is considered authorized and required little attention. The ZBB process focuses on the whol budget. This is accomplished by: (1) identifying decision units; (2) evaluating each decision unit in terms of performance, costs, benefits, and alternate means of accomplishiing the objectives; (3) ranking the decision packages; and (4) preparing a budget for the highest priority decision packages. The effect of the ZBB approach is that new high priority programs may be funded by eliminating or reducing existing lower-priority programs. ZBB is viewed as a logical process which can combine many of the elements of good management.

  9. Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less

  10. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less

  11. 75 FR 9218 - Notice of Availability Record of Decision for the Update to the Master Plan for the Consolidation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ..., Maryland. The ROD identifies that Alternative 2: Dispersed Density Action Alternative, as defined in the...: Implement Alternative 2: Dispersed Density Action Alternative. This alternative includes the following: (1...

  12. Improving the Slum Planning Through Geospatial Decision Support System

    NASA Astrophysics Data System (ADS)

    Shekhar, S.

    2014-11-01

    In India, a number of schemes and programmes have been launched from time to time in order to promote integrated city development and to enable the slum dwellers to gain access to the basic services. Despite the use of geospatial technologies in planning, the local, state and central governments have only been partially successful in dealing with these problems. The study on existing policies and programmes also proved that when the government is the sole provider or mediator, GIS can become a tool of coercion rather than participatory decision-making. It has also been observed that local level administrators who have adopted Geospatial technology for local planning continue to base decision-making on existing political processes. In this juncture, geospatial decision support system (GSDSS) can provide a framework for integrating database management systems with analytical models, graphical display, tabular reporting capabilities and the expert knowledge of decision makers. This assists decision-makers to generate and evaluate alternative solutions to spatial problems. During this process, decision-makers undertake a process of decision research - producing a large number of possible decision alternatives and provide opportunities to involve the community in decision making. The objective is to help decision makers and planners to find solutions through a quantitative spatial evaluation and verification process. The study investigates the options for slum development in a formal framework of RAY (Rajiv Awas Yojana), an ambitious program of Indian Government for slum development. The software modules for realizing the GSDSS were developed using the ArcGIS and Community -VIZ software for Gulbarga city.

  13. 50 CFR 81.14 - Comprehensive plan alternative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Comprehensive plan alternative. 81.14 Section 81.14 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CONSERVATION OF ENDANGERED AND...

  14. A new sparse optimization scheme for simultaneous beam angle and fluence map optimization in radiotherapy planning

    NASA Astrophysics Data System (ADS)

    Liu, Hongcheng; Dong, Peng; Xing, Lei

    2017-08-01

    {{\\ell }2,1} -minimization-based sparse optimization was employed to solve the beam angle optimization (BAO) in intensity-modulated radiation therapy (IMRT) planning. The technique approximates the exact BAO formulation with efficiently computable convex surrogates, leading to plans that are inferior to those attainable with recently proposed gradient-based greedy schemes. In this paper, we alleviate/reduce the nontrivial inconsistencies between the {{\\ell }2,1} -based formulations and the exact BAO model by proposing a new sparse optimization framework based on the most recent developments in group variable selection. We propose the incorporation of the group-folded concave penalty (gFCP) as a substitution to the {{\\ell }2,1} -minimization framework. The new formulation is then solved by a variation of an existing gradient method. The performance of the proposed scheme is evaluated by both plan quality and the computational efficiency using three IMRT cases: a coplanar prostate case, a coplanar head-and-neck case, and a noncoplanar liver case. Involved in the evaluation are two alternative schemes: the {{\\ell }2,1} -minimization approach and the gradient norm method (GNM). The gFCP-based scheme outperforms both counterpart approaches. In particular, gFCP generates better plans than those obtained using the {{\\ell }2,1} -minimization for all three cases with a comparable computation time. As compared to the GNM, the gFCP improves both the plan quality and computational efficiency. The proposed gFCP-based scheme provides a promising framework for BAO and promises to improve both planning time and plan quality.

  15. A new sparse optimization scheme for simultaneous beam angle and fluence map optimization in radiotherapy planning.

    PubMed

    Liu, Hongcheng; Dong, Peng; Xing, Lei

    2017-07-20

    [Formula: see text]-minimization-based sparse optimization was employed to solve the beam angle optimization (BAO) in intensity-modulated radiation therapy (IMRT) planning. The technique approximates the exact BAO formulation with efficiently computable convex surrogates, leading to plans that are inferior to those attainable with recently proposed gradient-based greedy schemes. In this paper, we alleviate/reduce the nontrivial inconsistencies between the [Formula: see text]-based formulations and the exact BAO model by proposing a new sparse optimization framework based on the most recent developments in group variable selection. We propose the incorporation of the group-folded concave penalty (gFCP) as a substitution to the [Formula: see text]-minimization framework. The new formulation is then solved by a variation of an existing gradient method. The performance of the proposed scheme is evaluated by both plan quality and the computational efficiency using three IMRT cases: a coplanar prostate case, a coplanar head-and-neck case, and a noncoplanar liver case. Involved in the evaluation are two alternative schemes: the [Formula: see text]-minimization approach and the gradient norm method (GNM). The gFCP-based scheme outperforms both counterpart approaches. In particular, gFCP generates better plans than those obtained using the [Formula: see text]-minimization for all three cases with a comparable computation time. As compared to the GNM, the gFCP improves both the plan quality and computational efficiency. The proposed gFCP-based scheme provides a promising framework for BAO and promises to improve both planning time and plan quality.

  16. Authentic Professional Development

    ERIC Educational Resources Information Center

    Kenneson, Paula M.

    1999-01-01

    Choosing Higher Options in Community Education (CHOICE) Alternative School is devoted to professional development. This report documents the need for and planning of sustained and supported professional development for 4 staff members at the CHOICE Alternative School in Jamestown, New York. There was no focused plan or vision for staff development…

  17. 42 CFR 441.103 - Alternate plans of care.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) In Guam, Puerto Rico, and the Virgin Islands, make available appropriate social services authorized... 42 Public Health 4 2010-10-01 2010-10-01 false Alternate plans of care. 441.103 Section 441.103 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  18. 42 CFR 441.103 - Alternate plans of care.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) In Guam, Puerto Rico, and the Virgin Islands, make available appropriate social services authorized... 42 Public Health 4 2011-10-01 2011-10-01 false Alternate plans of care. 441.103 Section 441.103 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  19. 77 FR 18151 - Discharge Removal Equipment for Vessels Carrying Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions... ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... CGD 90-068] RIN 1625-AA02, Formerly 2115-AD66 Discharge Removal Equipment for Vessels Carrying Oil...

  20. Fuel efficient traffic signal operation and evaluation: Garden Grove Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-02-01

    The procedures and results of a case study of fuel efficient traffic signal operation and evaluation in the City of Garden Grove, California are documented. Improved traffic signal timing was developed for a 70-intersection test network in Garden Grove using an optimization tool called the TRANSYT Version 8 computer program. Full-scale field testing of five alternative timing plans was conducted using two instrumented vehicles equipped to measure traffic performance characteristics and fuel consumption. The field tests indicated that significant improvements in traffic flow and fuel consumption result from the use of timing plans generated by the TRANSYT optimization model. Changingmore » from pre-existing to an optimized timing plan yields a networkwide 5 percent reduction in total travel time, more than 10 percent reduction in both the number of stops and stopped delay time, and 6 percent reduction in fuel consumption. Projections are made of the benefits and costs of implementing such a program at the 20,000 traffic signals in networks throughout the State of California.« less

  1. Contingency plan to provide safe drinking water for the city of Milan, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Talbot, J.J.; Brew, P.

    1994-12-31

    The city of Milan, in western Tennessee, supplies drinking water to approximately 4,000 customers. Environmental investigations conducted by the US Army have detected low concentrations of RDX, a compound used in the manufacture of explosives, in two of the three city water supply wells. The RDX is traceable to the Milan Army Ammunition Plant nearby. The levels of RDX are being monitored and current trends indicate that levels in the wells will exceed the EPA Health Advisory Limits in the near term. In order to ensure an uninterrupted supply of acceptable quality drinking water for the city residents, the Armymore » prepared and is implementing a Contingency Plan. The plan evaluated remedial alternatives to be implemented once a trigger level of RDX is reached, including institutional controls, installation of an RDX treatment system for the water supply system, and construction of a new well field. Institutional controls include: shutting down existing wells; continued monitoring; and promulgation of ground water ordinances. Treatment technologies evaluated include: ultraviolet light and hydrogen peroxide; or removal using granular activated carbon.« less

  2. Sampling pig farms at the abattoir in a cross-sectional study - Evaluation of a sampling method.

    PubMed

    Birkegård, Anna Camilla; Halasa, Tariq; Toft, Nils

    2017-09-15

    A cross-sectional study design is relatively inexpensive, fast and easy to conduct when compared to other study designs. Careful planning is essential to obtaining a representative sample of the population, and the recommended approach is to use simple random sampling from an exhaustive list of units in the target population. This approach is rarely feasible in practice, and other sampling procedures must often be adopted. For example, when slaughter pigs are the target population, sampling the pigs on the slaughter line may be an alternative to on-site sampling at a list of farms. However, it is difficult to sample a large number of farms from an exact predefined list, due to the logistics and workflow of an abattoir. Therefore, it is necessary to have a systematic sampling procedure and to evaluate the obtained sample with respect to the study objective. We propose a method for 1) planning, 2) conducting, and 3) evaluating the representativeness and reproducibility of a cross-sectional study when simple random sampling is not possible. We used an example of a cross-sectional study with the aim of quantifying the association of antimicrobial resistance and antimicrobial consumption in Danish slaughter pigs. It was not possible to visit farms within the designated timeframe. Therefore, it was decided to use convenience sampling at the abattoir. Our approach was carried out in three steps: 1) planning: using data from meat inspection to plan at which abattoirs and how many farms to sample; 2) conducting: sampling was carried out at five abattoirs; 3) evaluation: representativeness was evaluated by comparing sampled and non-sampled farms, and the reproducibility of the study was assessed through simulated sampling based on meat inspection data from the period where the actual data collection was carried out. In the cross-sectional study samples were taken from 681 Danish pig farms, during five weeks from February to March 2015. The evaluation showed that the sampling procedure was reproducible with results comparable to the collected sample. However, the sampling procedure favoured sampling of large farms. Furthermore, both under-sampled and over-sampled areas were found using scan statistics. In conclusion, sampling conducted at abattoirs can provide a spatially representative sample. Hence it is a possible cost-effective alternative to simple random sampling. However, it is important to assess the properties of the resulting sample so that any potential selection bias can be addressed when reporting the findings. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kumaran Nair, C; Hoffman, D; Wright, C

    Purpose: We aim to evaluate a new commercial dose mimicking inverse-planning application that was designed to provide cross-platform treatment planning, for its dosimetric quality and efficiency. The clinical benefit of this application allows patients treated on O-shaped linac to receive an equivalent plan on conventional L-shaped linac as needed for workflow or machine downtime. Methods: The dose mimicking optimization process seeks to create a similar DVH of an O-shaped linac-based plans with an alternative treatment technique (IMRT or VMAT), by maintaining target conformity, and penalizing dose falloff outside the target. Ten head and neck (HN) helical delivery plans, including simplemore » and complex cases were selected for re-planning with the dose mimicking application. All plans were generated for a 6 MV beam model, using 7-field/ 9-field IMRT and VMAT techniques. PTV coverage (D1, D99 and homogeneity index [HI]), and OARs avoidance (Dmean / Dmax) were compared. Results: The resulting dose mimicked HN plans achieved acceptable PTV coverage for HI (VMAT 7.0±2.3, 7-fld 7.3±2.4, and 9-fld 7.0±2.4), D99 (98.0%±0.7%, 97.8%±0.7%, and 98.0%±0.7%), as well as D1 (106.4%±2.1%, 106.5%±2.2%, and 106.4%±2.1%), respectively. The OAR dose discrepancy varied: brainstem (2% to 4%), cord (3% to 6%), esophagus (−4% to −8%), larynx (−4% to 2%), and parotid (4% to 14%). Mimicked plans would typically be needed for 1–5 fractions of a treatment course, and we estimate <1% variance would be introduced in target coverage while maintaining comparable low dose to OARs. All mimicked plans were approved by independent physician and passed patient specific QA within our established tolerance. Conclusion: Dose mimicked plans provide a practical alternative for responding to clinical workflow issues, and provide reliability for patient treatment. The quality of dose mimicking for HN patients highly depends on the delivery technique, field numbers and angles, as well as user selection of structures.« less

  4. Impact of 3-dimensional-computed tomography workstation for precise planning of endovascular aneurysm repair.

    PubMed

    Higashiura, Wataru; Sakaguchi, Shoji; Tabayashi, Nobuoki; Taniguchi, Shigeki; Kichikawa, Kimihiko

    2008-12-01

    Compared with open surgery, imaging is considered to be important for planning and device selection of endovascular aneurysm repair (EVAR). The present study evaluated the usefulness of a 3-dimensional (3D)-computed tomography (CT) workstation in planning EVAR. A prospective study was conducted in 8 patients who underwent EVAR using Zenith endograft between February and August 2007. Endograft size and optimized deployment projection were decided using a 3D-CT workstation. The primary endpoint was defined as successful deployment of a same size endograft as preoperatively selected without type I or III endoleak or inadvertent arterial occlusion. The following parameters were investigated: (a) incidence of use of an alternative endograft; (b) prevalence of type I or III endoleak; and (c) distance from lowest renal artery to tip of graft. Successful deployment of endograft was achieved in all 8 patients. Use of alternative endograft or type I or III endoleak was not detected in 8 patients. Distance from the lowest renal artery to the tip of the graft was 2.8mm. Assessment using a 3D-CT workstation appears to allow accurate endograft selection and precise deployment of the Zenith endograft without type I or III endoleak, even in institutes with a small number of patients.

  5. Test and Evaluation Plan for the Explosive Device Detection Baseline (EDDB) Study

    DTIC Science & Technology

    1995-08-01

    of civil aviation security has changed from hijackings to methods of countering bombings. This shift has markedly increased the need for improvements...to detect an environmental event or signal. SDT is a mathematical representation of human performance in deciding whether or not a signal is present...1970; Macmillan & Creelman , 1990; Snodgrass & Corwin, 1988). The chief difference between the measure c and its parametric alternative P3 lies in the

  6. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixedmore » waste.« less

  7. KSC-2009-4332

    NASA Image and Video Library

    2009-07-30

    CAPE CANAVERAL, Fla. – Phil McAlister, special assistant for Program Analysis in NASA's Office of Program Analysis and Evaluation, introduces the Augustine Commission, meeting in Cocoa Beach, Fla. At the request of the Office of Science and Technology Policy, NASA established the Review of U.S. Human Space Flight Plans Committee, known as the Augustine Commission. Chaired by Norman R. Augustine, retired chairman and CEO of Lockheed Martin Corp., the committee is conducting an independent review of ongoing U.S. human spaceflight plans and programs, as well as alternatives, to ensure the nation is pursuing the best trajectory for the future of human space flight - one that is safe, innovative, affordable, and sustainable. Photo credit: NASA/Jim Grossmann

  8. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  9. Manpower planning for nurse personnel.

    PubMed Central

    Keaveny, T J; Hayden, R L

    1978-01-01

    A technique is described which can be applied to manpower planning for nurse personnel at a state or regional level. An iterative process explores the implications of alternative planning policy decision strategies intended to balance manpower supply and requirements. Impacts of the following policy alternatives are estimated: scale of operations of education institutions; interstate migration patterns; labor force participation rates; and job design of licensed practical nurse (LPN) and registered nurse (RN) positions. PMID:665883

  10. CORRECTIVE ACTION DECISION DOCUMENT FOR AREA 9 UXO LANDFILL, TONOPAH TEST RNGE, CAU 453, REVISION 0, MARCH 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none

    1998-03-01

    This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less

  11. 75 FR 62507 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Committee and Plan Development Team in October 2010 to consider actions affecting New England fisheries in... jointly with the Habitat Plan Development Team to discuss management alternatives related to minimizing... Council's EFH Omnibus Amendment 2. The goal of the meeting is to craft a series of management alternatives...

  12. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    .... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...

  13. Lifetime costing of the body-in-white: Steel vs. aluminum

    NASA Astrophysics Data System (ADS)

    Han, Helen N.; Clark, Joel P.

    1995-05-01

    In order to make informed material choice decisions and to derive the maximum benefit from the use of alternative materials, the automobile producer must understand the full range of costs and benefits for each material. It is becoming clear that the conventional cost-benefit analysis structure currently used by the automotive industry must be broadened to include nontraditional costs such as the environmental externalities associated with the use of existing and potential automotive technologies. This article develops a methodology for comparing the costs and benefits associated with the use of alternative materials in automotive applications by focusing on steel and aluminum in the unibody body-in-white. Authors' Note: This is the first of two articles documenting a methodology for evaluating the lifetime monetary and environmental costs of alternative materials in automotive applications. This article addresses the traditional money costs while a subsequent paper, which is planned for the August issue, will address the environmental externalities.

  14. Field Scale Optimization for Long-Term Sustainability of Best Management Practices in Watersheds

    NASA Astrophysics Data System (ADS)

    Samuels, A.; Babbar-Sebens, M.

    2012-12-01

    Agricultural and urban land use changes have led to disruption of natural hydrologic processes and impairment of streams and rivers. Multiple previous studies have evaluated Best Management Practices (BMPs) as means for restoring existing hydrologic conditions and reducing impairment of water resources. However, planning of these practices have relied on watershed scale hydrologic models for identifying locations and types of practices at scales much coarser than the actual field scale, where landowners have to plan, design and implement the practices. Field scale hydrologic modeling provides means for identifying relationships between BMP type, spatial location, and the interaction between BMPs at a finer farm/field scale that is usually more relevant to the decision maker (i.e. the landowner). This study focuses on development of a simulation-optimization approach for field-scale planning of BMPs in the School Branch stream system of Eagle Creek Watershed, Indiana, USA. The Agricultural Policy Environmental Extender (APEX) tool is used as the field scale hydrologic model, and a multi-objective optimization algorithm is used to search for optimal alternatives. Multiple climate scenarios downscaled to the watershed-scale are used to test the long term performance of these alternatives and under extreme weather conditions. The effectiveness of these BMPs under multiple weather conditions are included within the simulation-optimization approach as a criteria/goal to assist landowners in identifying sustainable design of practices. The results from these scenarios will further enable efficient BMP planning for current and future usage.

  15. Costs of Food Safety Investments in the Meat and Poultry Slaughter Industries.

    PubMed

    Viator, Catherine L; Muth, Mary K; Brophy, Jenna E; Noyes, Gary

    2017-02-01

    To develop regulations efficiently, federal agencies need to know the costs of implementing various regulatory alternatives. As the regulatory agency responsible for the safety of meat and poultry products, the U.S. Dept. of Agriculture's Food Safety and Inspection Service is interested in the costs borne by meat and poultry establishments. This study estimated the costs of developing, validating, and reassessing hazard analysis and critical control points (HACCP), sanitary standard operating procedures (SSOP), and sampling plans; food safety training for new employees; antimicrobial equipment and solutions; sanitizing equipment; third-party audits; and microbial tests. Using results from an in-person expert consultation, web searches, and contacts with vendors, we estimated capital equipment, labor, materials, and other costs associated with these investments. Results are presented by establishment size (small and large) and species (beef, pork, chicken, and turkey), when applicable. For example, the cost of developing food safety plans, such as HACCP, SSOP, and sampling plans, can range from approximately $6000 to $87000, depending on the type of plan and establishment size. Food safety training costs from approximately $120 to $2500 per employee, depending on the course and type of employee. The costs of third-party audits range from approximately $13000 to $24000 per audit, and establishments are often subject to multiple audits per year. Knowing the cost of these investments will allow researchers and regulators to better assess the effects of food safety regulations and evaluate cost-effective alternatives. © 2017 Institute of Food Technologists®.

  16. 7 CFR 4284.630 - Other considerations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1940 of this title. Applications for technical assistance or planning projects are generally excluded... within their plans the important environmental factors within the planning area and the potential environmental impacts of the plan on the planning area, as well as the alternative planning strategies that were...

  17. Peer group reflection helps clinical teachers to critically reflect on their teaching.

    PubMed

    Boerboom, Tobias B B; Jaarsma, Debbie; Dolmans, Diana H J M; Scherpbier, Albert J J A; Mastenbroek, Nicole J J M; Van Beukelen, Peter

    2011-01-01

    Student evaluations can help clinical teachers to reflect on their teaching skills and find ways to improve their teaching. Studies have shown that the mere presentation of student evaluations is not a sufficient incentive for teachers to critically reflect on their teaching. We evaluated and compared the effectiveness of two feedback facilitation strategies that were identical except for a peer reflection meeting. In this study, 54 clinical teachers were randomly assigned to two feedback strategies. In one strategy, a peer reflection was added as an additional step. All teachers completed a questionnaire evaluating the strategy that they had experienced. We analysed the reflection reports and the evaluation questionnaire. Both strategies stimulated teachers to reflect on feedback and formulate alternative actions for their teaching practice. The teachers who had participated in the peer reflection meeting showed deeper critical reflection and more concrete plans to change their teaching. All feedback strategies were considered effective by the majority of the teachers. Strategies with student feedback and self-assessment stimulated reflection on teaching and helped clinical teachers to formulate plans for improvement. A peer reflection meeting seemed to enhance reflection quality. Further research should establish whether it can have lasting effects on teaching quality.

  18. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  19. Spatio-Temporal Process Variability in Watershed Scale Wetland Restoration Planning

    NASA Astrophysics Data System (ADS)

    Evenson, G. R.

    2012-12-01

    Watershed scale restoration decision making processes are increasingly informed by quantitative methodologies providing site-specific restoration recommendations - sometimes referred to as "systematic planning." The more advanced of these methodologies are characterized by a coupling of search algorithms and ecological models to discover restoration plans that optimize environmental outcomes. Yet while these methods have exhibited clear utility as decision support toolsets, they may be critiqued for flawed evaluations of spatio-temporally variable processes fundamental to watershed scale restoration. Hydrologic and non-hydrologic mediated process connectivity along with post-restoration habitat dynamics, for example, are commonly ignored yet known to appreciably affect restoration outcomes. This talk will present a methodology to evaluate such spatio-temporally complex processes in the production of watershed scale wetland restoration plans. Using the Tuscarawas Watershed in Eastern Ohio as a case study, a genetic algorithm will be coupled with the Soil and Water Assessment Tool (SWAT) to reveal optimal wetland restoration plans as measured by their capacity to maximize nutrient reductions. Then, a so-called "graphical" representation of the optimization problem will be implemented in-parallel to promote hydrologic and non-hydrologic mediated connectivity amongst existing wetlands and sites selected for restoration. Further, various search algorithm mechanisms will be discussed as a means of accounting for temporal complexities such as post-restoration habitat dynamics. Finally, generalized patterns of restoration plan optimality will be discussed as an alternative and possibly superior decision support toolset given the complexity and stochastic nature of spatio-temporal process variability.

  20. Pimp your landscape: a tool for qualitative evaluation of the effects of regional planning measures on ecosystem services.

    PubMed

    Fürst, Christine; Volk, Martin; Pietzsch, Katrin; Makeschin, Franz

    2010-12-01

    The article presents the platform "Pimp your landscape" (PYL), which aims firstly at the support of planners by simulating alternative land-use scenarios and by an evaluation of benefits or risks for regionally important ecosystem services. Second, PYL supports an integration of information on environmental and landscape conditions into impact assessment. Third, PYL supports the integration of impacts of planning measures on ecosystem services. PYL is a modified 2-D cellular automaton with GIS features. The cells have the major attribute "land-use type" and can be supplemented with additional information, such as specifics regarding geology, topography and climate. The GIS features support the delineation of non-cellular infrastructural elements, such as roads or water bodies. An evaluation matrix represents the core element of the system. In this matrix, values in a relative scale from 0 (lowest value) to 100 (highest value) are assigned to the land-use types and infrastructural elements depending on their effect on ecosystem services. The option to configure rules for describing the impact of environmental attributes and proximity effects on cell values and land-use transition probabilities is of particular importance. User interface and usage of the platform are demonstrated by an application case. Constraints and limits of the recent version are discussed, including the need to consider in the evaluation, landscape-structure aspects such as patch size, fragmentation and spatial connectivity. Regarding the further development, it is planned to include the impact of land management practices to support climate change adaptation and mitigation strategies in regional planning.

  1. A tax strategy for healthcare workers. Section 403(b) plans are an alternative to weakened IRAs.

    PubMed

    Crain, J L; Morris, J L; Ballard, M R

    1990-01-01

    After the Tax Reform Act of 1986 reduced the tax-deduction benefits of investing in IRAs, many healthcare employees went looking for alternative tax-shelter investments. Several options are available. One alternative for taxpayers employed by tax-exempt organizations is Section 403(b) tax-deferred annuities (TDAs). Although the Tax Reform Act left Section 403(b) TDAs largely intact, it established a comprehensive set of nondiscrimination rules for certain statutory fringe-benefit plans--including Section 403(b) plans. The new rules are designed to restrict situations that favor participation by highly paid employees to the exclusion of other employees. Perhaps one of the harshest adjustments the 1986 law mandated is the imposition of an additional 10 percent income tax on withdrawals an investor makes from Section 403(b) plans before reaching the age of 59 years and 6 months. This excise tax had already applied to early withdrawals from an IRA, but the new law extends the penalty tax to cover all qualified plans, including TDAs.

  2. Enhancing stakeholder involvement in environmental decision making: Active Response Geographic Information System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Faber, B.G.; Thomas, V.L.; Thomas, M.R.

    This paper describes a spatial decision support system that facilitates land-related negotiations and resolving conflicts. This system, called Active Response Geographic Information System (AR/GIS), uses a geographic information system to examine land resource management issues which involve multiple stakeholder groups. In this process, participants are given the opportunity and tools needed to share ideas in a facilitated land resource allocation negotiation session. Participants are able to assess current land status, develop objectives, propose alternative planning scenarios, and evaluate the effects or impacts of each alternative. AR/GIS is a unique tool that puts geographic information directly at the fingertips of non-technicalmore » policy analysts, decision makers, and representatives of stakeholder groups during the negotiation process. AR/GIS enhances individual comprehension and ownership of the decision making process and increasing the efficiency and effectiveness of group debate. It is most beneficial to planning tasks which are inherently geographic in nature, which require consideration of a large number of physical constraints and economic implications, and which involve publicly sensitive tradeoffs.« less

  3. Reference Mission Version 3.0 Addendum to the Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team. Addendum; 3.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor)

    1998-01-01

    This Addendum to the Mars Reference Mission was developed as a companion document to the NASA Special Publication 6107, "Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team." It summarizes changes and updates to the Mars Reference Missions that were developed by the Exploration Office since the final draft of SP 6107 was printed in early 1999. The Reference Mission is a tool used by the exploration community to compare and evaluate approaches to mission and system concepts that could be used for human missions to Mars. It is intended to identify and clarify system drivers, significant sources of cost, performance, risk, and schedule variation. Several alternative scenarios, employing different technical approaches to solving mission and technology challenges, are discussed in this Addendum. Comparing alternative approaches provides the basis for continual improvement to technology investment plan and a general understanding of future human missions to Mars. The Addendum represents a snapshot of work in progress in support of planning for future human exploration missions through May 1998.

  4. Space Station redesign option A: Modular buildup concept

    NASA Technical Reports Server (NTRS)

    1993-01-01

    In early 1993, President Clinton mandated that NASA look at lower cost alternatives to Space Station Freedom. He also established an independent advisory committee - the Blue Ribbon Panel - to review the redesign work and evaluate alternatives. Daniel Goldin, NASA Administrator, established a Station Redesign Team that began operating in late March from Crystal City, Virginia. NASA intercenter teams - one each at Marshall Space Flight Center, Johnson Space Center, and Langley Research Center provided engineering and other support. The results of the Option A study done at Marshall Space Flight Center are summarized. Two configurations (A-1 and A-2) are covered. Additional data is provided in the briefing package MSFC SRT-001, Final System Review to SRT-002, Space Station Option A Modular Buildup Concept, Volumes 1-5, Revision B, June 10, 1993. In June 1993, President Clinton decided to proceed with a modular concept consistent with Option A, and asked NASA to provide an Implementation Plan by September. All data from the Option A redesign activity was provided to NASA's Transition Team for use in developing the Implementation Plan.

  5. Choosing a reliability inspection plan for interval censored data

    DOE PAGES

    Lu, Lu; Anderson-Cook, Christine Michaela

    2017-04-19

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  6. Choosing a reliability inspection plan for interval censored data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Lu; Anderson-Cook, Christine Michaela

    Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less

  7. Strategic decision making under climate change: a case study on Lake Maggiore water system

    NASA Astrophysics Data System (ADS)

    Micotti, M.; Soncini Sessa, R.; Weber, E.

    2014-09-01

    Water resources planning processes involve different kinds of decisions that are generally evaluated under a stationary climate scenario assumption. In general, the possible combinations of interventions are mutually compared as single alternatives. However, the ongoing climate change requires us to reconsider this approach. Indeed, what have to be compared are not individual alternatives, but families of alternatives, characterized by the same structural decisions, i.e. by actions that have long-term effects and entail irrevocable changes in the system. The rationale is that the structural actions, once they have been implemented, cannot be easily modified, while the management decisions can be adapted to the evolving conditions. This paper considers this methodological problem in a real case study, in which a strategic decision has to be taken: a new barrage was proposed to regulate Lake Maggiore outflow, but, alternatively, either the present barrage can be maintained with its present regulation norms or with a new one. The problem was dealt with by multi-criteria decision analysis involving many stakeholders and two decision-makers. An exhaustive set of indicators was defined in the participatory process, conducted under the integrated water resource management paradigm, and many efficient (in Pareto sense) regulation policies were identified. The paper explores different formulations of a global index to evaluate and compare the effectiveness of the classes of alternatives under both stationary and changing hydrological scenarios in order to assess their adaptability to the ongoing climate change.

  8. 76 FR 52690 - Final Environmental Impact Statement on Nabesna Off-Road Vehicle Management Plan, Wrangell-St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...-Road Vehicle Management Plan, Wrangell-St. Elias National Park and Preserve AGENCY: National Park... a Final Environmental Impact Statement (FEIS) on Off-Road Vehicle Management in the Nabesna District... preferred alternative and four action alternatives for management of off-road vehicles in the Nabesna...

  9. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Statement (EIS) for the General Management Plan (GMP) for Fort Matanzas National Monument (Monument... EIS/GMP describes the NPS preferred alternative--Alternative B--to guide the management of the... prescriptions to ensure protection, access and enjoyment of the Monument's resources. An up-to-date GMP is...

  10. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Historic trails. The four alternatives were: Alternative A: Continues existing management practices (no... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement...

  11. Inverse planning in three-dimensional conformal and intensity-modulated radiotherapy of mid-thoracic oesophageal cancer.

    PubMed

    Wu, V W C; Sham, J S T; Kwong, D L W

    2004-07-01

    The aim of this study is to demonstrate the use of inverse planning in three-dimensional conformal radiation therapy (3DCRT) of oesophageal cancer patients and to evaluate its dosimetric results by comparing them with forward planning of 3DCRT and inverse planning of intensity-modulated radiotherapy (IMRT). For each of the 15 oesophageal cancer patients in this study, the forward 3DCRT, inverse 3DCRT and inverse IMRT plans were produced using the FOCUS treatment planning system. The dosimetric results and the planner's time associated with each of the treatment plans were recorded for comparison. The inverse 3DCRT plans showed similar dosimetric results to the forward plans in the planning target volume (PTV) and organs at risk (OARs). However, they were inferior to that of the IMRT plans in terms of tumour control probability and target dose conformity. Furthermore, the inverse 3DCRT plans were less effective in reducing the percentage lung volume receiving a dose below 25 Gy when compared with the IMRT plans. The inverse 3DCRT plans delivered a similar heart dose as in the forward plans, but higher dose than the IMRT plans. The inverse 3DCRT plans significantly reduced the operator's time by 2.5 fold relative to the forward plans. In conclusion, inverse planning for 3DCRT is a reasonable alternative to the forward planning for oesophageal cancer patients with reduction of the operator's time. However, IMRT has the better potential to allow further dose escalation and improvement of tumour control.

  12. Computer Based Decision Support Tool for Helicopter Mission Planning in Disaster Relief and Military Operations (Outil informatique d’aide a la decision pour la planification des missions d’helicopteres dans des operations militaires et de secours en cas de catastrophe)

    DTIC Science & Technology

    2008-06-01

    capacity planning; • Electrical generation capacity planning; • Machine scheduling; • Freight scheduling; • Dairy farm expansion planning...Support Systems and Multi Criteria Decision Analysis Products A.2.11.2.2.1 ELECTRE IS ELECTRE IS is a generalization of ELECTRE I. It is a...criteria, ELECTRE IS supports the user in the process of selecting one alternative or a subset of alternatives. The method consists of two parts

  13. Diverse Planning for UAV Control and Remote Sensing

    PubMed Central

    Tožička, Jan; Komenda, Antonín

    2016-01-01

    Unmanned aerial vehicles (UAVs) are suited to various remote sensing missions, such as measuring air quality. The conventional method of UAV control is by human operators. Such an approach is limited by the ability of cooperation among the operators controlling larger fleets of UAVs in a shared area. The remedy for this is to increase autonomy of the UAVs in planning their trajectories by considering other UAVs and their plans. To provide such improvement in autonomy, we need better algorithms for generating alternative trajectory variants that the UAV coordination algorithms can utilize. In this article, we define a novel family of multi-UAV sensing problems, solving task allocation of huge number of tasks (tens of thousands) to a group of configurable UAVs with non-zero weight of equipped sensors (comprising the air quality measurement as well) together with two base-line solvers. To solve the problem efficiently, we use an algorithm for diverse trajectory generation and integrate it with a solver for the multi-UAV coordination problem. Finally, we experimentally evaluate the multi-UAV sensing problem solver. The evaluation is done on synthetic and real-world-inspired benchmarks in a multi-UAV simulator. Results show that diverse planning is a valuable method for remote sensing applications containing multiple UAVs. PMID:28009831

  14. Diverse Planning for UAV Control and Remote Sensing.

    PubMed

    Tožička, Jan; Komenda, Antonín

    2016-12-21

    Unmanned aerial vehicles (UAVs) are suited to various remote sensing missions, such as measuring air quality. The conventional method of UAV control is by human operators. Such an approach is limited by the ability of cooperation among the operators controlling larger fleets of UAVs in a shared area. The remedy for this is to increase autonomy of the UAVs in planning their trajectories by considering other UAVs and their plans. To provide such improvement in autonomy, we need better algorithms for generating alternative trajectory variants that the UAV coordination algorithms can utilize. In this article, we define a novel family of multi-UAV sensing problems, solving task allocation of huge number of tasks (tens of thousands) to a group of configurable UAVs with non-zero weight of equipped sensors (comprising the air quality measurement as well) together with two base-line solvers. To solve the problem efficiently, we use an algorithm for diverse trajectory generation and integrate it with a solver for the multi-UAV coordination problem. Finally, we experimentally evaluate the multi-UAV sensing problem solver. The evaluation is done on synthetic and real-world-inspired benchmarks in a multi-UAV simulator. Results show that diverse planning is a valuable method for remote sensing applications containing multiple UAVs.

  15. Optimal helicopter trajectory planning for terrain following flight

    NASA Technical Reports Server (NTRS)

    Menon, P. K. A.

    1990-01-01

    Helicopters operating in high threat areas have to fly close to the earth surface to minimize the risk of being detected by the adversaries. Techniques are presented for low altitude helicopter trajectory planning. These methods are based on optimal control theory and appear to be implementable onboard in realtime. Second order necessary conditions are obtained to provide a criterion for finding the optimal trajectory when more than one extremal passes through a given point. A second trajectory planning method incorporating a quadratic performance index is also discussed. Trajectory planning problem is formulated as a differential game. The objective is to synthesize optimal trajectories in the presence of an actively maneuvering adversary. Numerical methods for obtaining solutions to these problems are outlined. As an alternative to numerical method, feedback linearizing transformations are combined with the linear quadratic game results to synthesize explicit nonlinear feedback strategies for helicopter pursuit-evasion. Some of the trajectories generated from this research are evaluated on a six-degree-of-freedom helicopter simulation incorporating an advanced autopilot. The optimal trajectory planning methods presented are also useful for autonomous land vehicle guidance.

  16. Water Planning and Climate Change: Actionable Intelligence Yet?

    NASA Astrophysics Data System (ADS)

    Milly, P.

    2008-05-01

    Within a rational planning framework, water planners design major water projects by evaluating tradeoffs of costs, benefits, and risks to life and property. The evaluation is based on anticipated future runoff and streamflow. Generally, planners have invoked the stationarity approximation: they have assumed that hydrologic conditions during the planned lifetime of a project will be similar to those observed in the past. Contemporary anthropogenic climate change arguably makes stationarity untenable. In principle, stationarity-based planning under non- stationarity potentially leads to incorrect assessment of tradeoffs, sub-optimal decisions, and excessive financial and environmental costs (e.g., a reservoir that is too big to ever be filled) and/or insufficient benefits (e.g., levees that are too small to hold back the flood waters). As the reigning default assumption for planning, stationarity is an easy target for criticism; provision of a practical alternative is not so easy. The leading alternative, use of quantitative climate-change projections from global climate models in conjunction with water planners' river-basin models, has serious shortcomings of its own. Climate models (1) neglect some terrestrial processes known to influence runoff and streamflow; (2) do not represent precipitation well at the finer resolved time and space scales; (3) do not resolve any processes at the even finer spatial scale of relevance to much of water planning; and (4) disagree among themselves about some changes. Even setting aside the issue of scale mismatch, for which various "downscaling" methods have been proposed, outputs from climate models generally are not directly transferable to river-basin models, and river-basin models commonly use empiricisms whose historical validity might not extrapolate well under climate change. So climate science is informing water management that stationarity is a flawed assumption, but it has not presented a universally and reliably superior alternative. What is to be done? Is climate-change information of sufficient strength to justify making decisions that differ from those that would be optimal under stationarity? I.e., does climate science provide "actionable intelligence" to water planners? A conservative approach to planning in the presence of climate change would begin with stationarity as a base and then superpose, with quantitative estimates of uncertainties, those model-projected changes that appear to be qualitatively robust. The current state of science suggests that the following changes could be considered robust: (1) reduction in the fraction of precipitation falling as snow and earlier seasonal melting of snow, with consequent seasonal redistribution of runoff and streamflow; (2) gradual sea-level rise with heightened risk of encroachment of saline water into coastal surface- and ground-water-supply sources; and (3) global redistribution of precipitation and resultant runoff, with regional focal points ("hot spots") of desiccation and moistening. Even considering the attendant uncertainties, the available information about these changes can significantly affect the cost-benefit-risk tradeoffs of existing and prospective water projects and, therefore, can rationally inform decisions about future courses of action or inaction.

  17. 77 FR 40030 - Notice of Availability of Draft Environmental Impact Statement for the Proposed Sierra Vista...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... proposed action and alternatives for development of a large-scale, mixed-use, mixed-density master- planned... applicant group's preferred alternative; (c) Reduced Footprint/Increased Density Alternative; (d) Reduced Footprint/Same Density Alternative; (e) Focused Avoidance Alternative; and (f) Southwest Site, an off site...

  18. Efficacy of phase 3 trial of RTS, S/AS01 malaria vaccine: The need for an alternative development plan.

    PubMed

    Mahmoudi, Shima; Keshavarz, Hossein

    2017-09-02

    Although vaccines would be the ideal tool for control, prevention, elimination, and eradication of many infectious diseases, developing of parasites vaccines such as malaria vaccine is very complex. The most advanced malaria vaccine candidate RTS,S, a pre-erythrocytic vaccine, has been recommended for licensure by EMEA. The results of this phase III trial suggest that this candidate malaria vaccine has relatively little efficacy, and the vaccine apparently will not meet the goal of malaria eradication by itself. Since there are many vaccine candidates in the pipeline 1 that are being evaluated in vaccine trials, further study on using of alternative parasite targets and vaccination strategies are highly recommended.

  19. Sex education and family planning services for young adults: alternative urban strategies in Mexico.

    PubMed

    Townsend, J W; Diaz de May, E; Sepúlveda, Y; Santos de Garza, Y; Rosenhouse, S

    1987-01-01

    In Mexico, youth face difficulties in obtaining reliable information on sex education and family planning through existing community programs. Two alternative strategies to provide these services are being tested in poor urban areas of Monterrey. In one experimental area, Integrated Youth Centers were established, which provide sex education and family planning services as well as counseling, academic tutoring, and recreational activities. In another area, trained young adults and community counselors work through informal networks to provide sex education and family planning information. Both utilization and the cost of these services are examined in the context of plans for expanding coverage in Mexico-U.S. border areas.

  20. Fiberoptic Endoscopic Evaluation of Swallowing: A Multidisciplinary Alternative for Assessment of Infants With Dysphagia in the Neonatal Intensive Care Unit.

    PubMed

    Reynolds, Jenny; Carroll, Sandra; Sturdivant, Chrysty

    2016-02-01

    The standard procedure to assess an infant in the neonatal intensive care unit (NICU) who is suspected of aspirating on oral feedings is a videofluoroscopic swallowing study (VFSS). The VFSS has been used for more than 30 years to assess dysphagia and is considered the gold standard. However, there are challenges to the VFSS, including radiation exposure, transport to radiology, usage of barium, limited positioning options, and cost. An alternative approach is fiberoptic endoscopic evaluation of swallowing (FEES), which uses a flexible endoscope passed transnasally into the pharynx to assess anatomy, movement/sensation of structures, swallow function, and response to therapeutic interventions. Fiberoptic endoscopic evaluation of swallowing has been established as a valid tool for evaluating dysphagia and utilized as an alternative or supplement to the VFSS in both adults and children. This article provides an overview of the current challenges in the NICU with assessing aspiration and introduces a multidisciplinary FEES program for bottle and breastfeeding. A review of the literature of dysphagia, VFSS, and FEES in the adult, pediatric, infant, and neonatal populations was performed. Clinical competency standards were researched and then implemented through an internal process of validation. Finally, a best practice protocol was designed as it relates to FEES in the NICU. Fiberoptic endoscopic evaluation of swallowing is a safe alternative to the VFSS. It can be utilized at the infant's bedside in a NICU for the diagnosis and treatment of swallowing disorders by allowing the clinician the ability to replicate a more accurate feeding experience, therefore, determining a safe feeding plan. Competency and training are essential to establishing a multidisciplinary FEES program in the NICU. Further research is needed to compare the efficacy and validity of FEES versus VFSS for infants in the NICU. Furthermore, evaluating the efficacy of FEES during breastfeeding is warranted.

  1. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Busse, John; Keil, Karen; Staten, Jane

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)« less

  2. Hospital referral patterns: how emergency medical care is accessed in a disaster.

    PubMed

    Reilly, Michael J; Markenson, David

    2010-10-01

    A prevalent assumption in hospital emergency preparedness planning is that patient arrival from a disaster scene will occur through a coordinated system of patient distribution based on the number of victims, capabilities of the receiving hospitals, and the nature and severity of illness or injury. In spite of the strength of the emergency medical services system, case reports in the literature and major incident after-action reports have shown that most patients who present at a health care facility after a disaster or other major emergency do not necessarily arrive via ambulance. If these reports of arrival of patients outside an organized emergency medical services system are accurate, then hospitals should be planning differently for the impact of an unorganized influx of patients on the health care system. Hospitals need to consider alternative patterns of patient referral, including the mass convergence of self-referred patients, when performing major incident planning. We conducted a retrospective review of published studies from the past 25 years to identify reports of patient care during disasters or major emergency incidents that described the patients' method of arrival at the hospital. Using a structured mechanism, we aggregated and analyzed the data. Detailed data on 8303 patients from more than 25 years of literature were collected. Many reports suggest that only a fraction of the patients who are treated in emergency departments following disasters arrive via ambulance, particularly in the early postincident stages of an event. Our 25 years of aggregate data suggest that only 36% of disaster victims are transported to hospitals via ambulance, whereas 63% use alternate means to seek emergency medical care. Hospitals should evaluate their emergency plans to consider the implications of alternate referral patterns of patients during a disaster. Additional consideration should be given to mass triage, site security, and the potential need for decontamination after a major incident.

  3. Transboundary impacts on regional ground water modeling in Texas

    USGS Publications Warehouse

    Rainwater, K.; Stovall, J.; Frailey, S.; Urban, L.

    2005-01-01

    Recent legislation required regional grassroots water resources planning across the entire state of Texas. The Texas Water Development Board (TWDB), the state's primary water resource planning agency, divided the state into 16 planning regions. Each planning group developed plans to manage both ground water and surface water sources and to meet future demands of various combinations of domestic, agricultural, municipal, and industrial water consumers. This presentation describes the challenges in developing a ground water model for the Llano Estacado Regional Water Planning Group (LERWPG), whose region includes 21 counties in the Southern High Plains of Texas. While surface water is supplied to several cities in this region, the vast majority of the regional water use comes from the High Plains aquifer system, often locally referred to as the Ogallala Aquifer. Over 95% of the ground water demand is for irrigated agriculture. The LERWPG had to predict the impact of future TWDB-projected water demands, as provided by the TWDB, on the aquifer for the period 2000 to 2050. If detrimental impacts were noted, alternative management strategies must be proposed. While much effort was spent on evaluating the current status of the ground water reserves, an appropriate numerical model of the aquifer system was necessary to demonstrate future impacts of the predicted withdrawals as well as the effects of the alternative strategies. The modeling effort was completed in the summer of 2000. This presentation concentrates on the political, scientific, and nontechnical issues in this planning process that complicated the modeling effort. Uncertainties in data, most significantly in distribution and intensity of recharge and withdrawals, significantly impacted the calibration and predictive modeling efforts. Four predictive scenarios, including baseline projections, recurrence of the drought of record, precipitation enhancement, and reduced irrigation demand, were simulated to identify counties at risk of low final ground water storage volume or low levels of satisfied demand by 2050. Copyright ?? 2005 National Ground Water Association.

  4. Decision Making: The Toughest Job in the World

    ERIC Educational Resources Information Center

    Bullis, Robert V.

    1977-01-01

    The four phases in rational decision-making are (1) diagnosis, (2) discovering alternative solutions, (3) analyzing and comparing alternatives, and (4) selecting the proper alternative or plan to follow. (Author)

  5. A spatial web/agent-based model to support stakeholders' negotiation regarding land development.

    PubMed

    Pooyandeh, Majeed; Marceau, Danielle J

    2013-11-15

    Decision making in land management can be greatly enhanced if the perspectives of concerned stakeholders are taken into consideration. This often implies negotiation in order to reach an agreement based on the examination of multiple alternatives. This paper describes a spatial web/agent-based modeling system that was developed to support the negotiation process of stakeholders regarding land development in southern Alberta, Canada. This system integrates a fuzzy analytic hierarchy procedure within an agent-based model in an interactive visualization environment provided through a web interface to facilitate the learning and negotiation of the stakeholders. In the pre-negotiation phase, the stakeholders compare their evaluation criteria using linguistic expressions. Due to the uncertainty and fuzzy nature of such comparisons, a fuzzy Analytic Hierarchy Process is then used to prioritize the criteria. The negotiation starts by a development plan being submitted by a user (stakeholder) through the web interface. An agent called the proposer, which represents the proposer of the plan, receives this plan and starts negotiating with all other agents. The negotiation is conducted in a step-wise manner where the agents change their attitudes by assigning a new set of weights to their criteria. If an agreement is not achieved, a new location for development is proposed by the proposer agent. This process is repeated until a location is found that satisfies all agents to a certain predefined degree. To evaluate the performance of the model, the negotiation was simulated with four agents, one of which being the proposer agent, using two hypothetical development plans. The first plan was selected randomly; the other one was chosen in an area that is of high importance to one of the agents. While the agents managed to achieve an agreement about the location of the land development after three rounds of negotiation in the first scenario, seven rounds were required in the second scenario. The proposed web/agent-based model facilitates the interaction and learning among stakeholders when facing multiple alternatives. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Development of a Spatial Decision Support System for Analyzing Changes in Hydro-meteorological Risk

    NASA Astrophysics Data System (ADS)

    van Westen, Cees

    2013-04-01

    In the framework of the EU FP7 Marie Curie ITN Network "CHANGES: Changing Hydro-meteorological Risks, as Analyzed by a New Generation of European Scientists (http://www.changes-itn.eu)", a spatial decision support system is under development with the aim to analyze the effect of risk reduction planning alternatives on reducing the risk now and in the future, and support decision makers in selecting the best alternatives. The SDSS is one of the main outputs of the CHANGES network, which will develop an advanced understanding of how global changes, related to environmental and climate change as well as socio-economical change, may affect the temporal and spatial patterns of hydro-meteorological hazards and associated risks in Europe; how these changes can be assessed, modeled, and incorporated in sustainable risk management strategies, focusing on spatial planning, emergency preparedness and risk communication. The CHANGES network consists of 11 full partners and 6 associate partners of which 5 private companies, representing 10 European countries. The CHANGES network has hired 12 Early Stage Researchers (ESRs) and is currently hiring 3-6 researchers more for the implementation of the SDSS. The Spatial Decision Support System will be composed of a number of integrated components. The Risk Assessment component allows to carry out spatial risk analysis, with different degrees of complexity, ranging from simple exposure (overlay of hazard and assets maps) to quantitative analysis (using different hazard types, temporal scenarios and vulnerability curves) resulting into risk curves. The platform does not include a component to calculate hazard maps, and existing hazard maps are used as input data for the risk component. The second component of the SDSS is a risk reduction planning component, which forms the core of the platform. This component includes the definition of risk reduction alternatives (related to disaster response planning, risk reduction measures and spatial planning) and links back to the risk assessment module to calculate the new level of risk if the measure is implemented, and a cost-benefit (or cost-effectiveness/ Spatial Multi Criteria Evaluation) component to compare the alternatives and make decision on the optimal one. The third component of the SDSS is a temporal scenario component, which allows to define future scenarios in terms of climate change, land use change and population change, and the time periods for which these scenarios will be made. The component doesn't generate these scenarios but uses input maps for the effect of the scenarios on the hazard and assets maps. The last component is a communication and visualization component, which can compare scenarios and alternatives, not only in the form of maps, but also in other forms (risk curves, tables, graphs). The envisaged users of the platform are organizations involved in planning of risk reduction measures, and that have staff capable of visualizing and analyzing spatial data at a municipal scale. This paper presents the main components of the SDSS and the overall design and plans for the user interface.

  7. General Design Memorandum. Phase I and Environmental Impact Statement for Flood Control and Related Purposes, Sheyenne River, North Dakota.

    DTIC Science & Technology

    1982-01-01

    Cass Water Management District, and North Dakota State Water Commission, have testified to the severity of flooding along the lower Sheyenne River and...have requested study and implementation of alternatives to resolve these problems. Several interests testifying in opposition to the authorized Kindred...alternative was borderline . The plan is not considered implementable. 3.07 Plan K-2 - Plan K-2 consists of a reduced-size Kindred Dam, a 5- to 15

  8. An Evaluation of Rebuilding Policies for U.S. Fisheries.

    PubMed

    Benson, Ashleen Julia; Cooper, Andrew B; Carruthers, Thomas R

    2016-01-01

    Rebuilding depleted fish populations is a priority of modern fisheries management. In the U.S., strong statutory mandates extend to both the goals and process by which stocks are to be rebuilt. However, the National Standard Guidelines that govern the implementation of the Magnuson-Stevens Fishery Conservation and Management Act may change to increase flexibility in rebuilding requirements. In this study we evaluate performance of the status quo approach to fish stock rebuilding in the United States against 3 alternatives that have been proposed to improve rebuilding outcomes. These alternatives either simplify the analytical requirements of rebuilding analyses or apply 'best practices' in fisheries management, thereby avoiding the need for rebuilding analyses altogether. We use a Management Strategy Evaluation framework to evaluate rebuilding options across 6 fish life history types and 5 possible real-world fishery scenarios that include options for stock assessment quality, multiple fleets, and the degree to which the stocks are overfished at the start of the analysis. We show that the status quo rebuilding plan and a harvest control rule that reduces harvest rates at low stock size generally achieve the best rebuilding outcomes across all life-history types and fishery scenarios. Both approaches constrain fishing in the short term, but achieve high catches in the medium and long term as stocks rebuild to productive levels. These results support a growing body of literature that indicates that efforts to end overfishing early pay off in the medium- to long-term with higher cumulative catches than the alternative.

  9. Consider long-term care as service alternative.

    PubMed

    Loria, L S

    1987-04-01

    The increasing demand for elderly care services, pressures on inpatient average length of stay and payment levels, and potential financial rewards from providing additional services, makes long-term care look attractive to hospitals. Long-term care, however, is not for every hospital. Before deciding to establish long-term care services, management should examine how the service fits within the hospital's strategic plan. The action plan below provides guidance in evaluating a decision to use hospital facilities for long-term care. Examine how long-term care services fit within the hospital's strategic plan. Study area demographics and competitors to assess the need and supply of long-term care services. Survey the medical staff, consumers and payers to determine attitudes, perceptions and interests regarding long-term care services. Develop a facility plan that identifies areas of excess capacity that can be most easily converted into long-term care with minimal effects on hospital operations. Prepare a financial feasibility analysis of the contribution margin and return on investment attributable to long-term care services. Include an impact analysis on hospital operations. Establish a management task force to develop a detailed implementation plan including assigned individual responsibilities and related timetable. Develop an effective marketing plan designed to generate increased patient market share.

  10. Assumptions of acceptance sampling and the implications for lot contamination: Escherichia coli O157 in lots of Australian manufacturing beef.

    PubMed

    Kiermeier, Andreas; Mellor, Glen; Barlow, Robert; Jenson, Ian

    2011-04-01

    The aims of this work were to determine the distribution and concentration of Escherichia coli O157 in lots of beef destined for grinding (manufacturing beef) that failed to meet Australian requirements for export, to use these data to better understand the performance of sampling plans based on the binomial distribution, and to consider alternative approaches for evaluating sampling plans. For each of five lots from which E. coli O157 had been detected, 900 samples from the external carcass surface were tested. E. coli O157 was not detected in three lots, whereas in two lots E. coli O157 was detected in 2 and 74 samples. For lots in which E. coli O157 was not detected in the present study, the E. coli O157 level was estimated to be <12 cells per 27.2-kg carton. For the most contaminated carton, the total number of E. coli O157 cells was estimated to be 813. In the two lots in which E. coli O157 was detected, the pathogen was detected in 1 of 12 and 2 of 12 cartons. The use of acceptance sampling plans based on a binomial distribution can provide a falsely optimistic view of the value of sampling as a control measure when applied to assessment of E. coli O157 contamination in manufacturing beef. Alternative approaches to understanding sampling plans, which do not assume homogeneous contamination throughout the lot, appear more realistic. These results indicate that despite the application of stringent sampling plans, sampling and testing approaches are inefficient for controlling microbiological quality.

  11. Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2005-01-01

    Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. To achieve a substrate condition suitable for the application of a coating system, both new and old (in-situ) substrates must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The level of cleanliness or anchor profile desired is typically a function of the type of coating to be applied and the specification being adhered to. In high performance environments, cleanliness and surface profile requirements for carbon steel (the dominant substrate for facilities, structures and equipment) dictates the use of abrasive media. Many of the abrasive media currently used across NASA and Air Force Space Command (AFSPC) installations generate large quantities of fugitive particulate emissions and waste. The high quantities of airborne dust and waste generated from these operations pose significant environmental concern. Efforts to contain emissions and the reduce quantity of waste generated have significant implications on project cost; this is often a deterrent to engaging in maintenance activities. In response to recent technological developments and NASA's and AFSPC's need to undertake environmentally conscious corrosion prevention projects, a review of the industry needs to be undertaken to evaluate surface preparation technologies (materials and processes) for embrace. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.

  12. 20 CFR 411.715 - If an alternate participant becomes an EN, will beneficiaries for whom an employment plan was...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., will beneficiaries for whom an employment plan was signed prior to implementation be covered under the Ticket to Work program payment provisions? 411.715 Section 411.715 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate...

  13. 20 CFR 411.730 - What happens if an alternate participant signed an employment plan with a beneficiary before...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... signed an employment plan with a beneficiary before Ticket to Work program implementation in the State... Section 411.730 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate Participants Under the Programs For Payments For...

  14. 76 FR 5611 - Notice of Availability of the Environmental Assessment for the Short Term Sentences Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... action alternatives and the No Action Alternative. Natural, cultural, and socioeconomic resource impacts.... Cohn, Chief, or Issac J. Gaston, Site Selection Specialist, Capacity Planning and Site Selection Branch..., Capacity Planning and Site Selection Branch. [FR Doc. 2011-1817 Filed 1-31-11; 8:45 am] BILLING CODE P ...

  15. 76 FR 62832 - Draft Environmental Impact Statement for General Management Plan, Blue Ridge Parkway, VA and NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... General Management Plan (GMP) for Blue Ridge Parkway (parkway). Consistent with NPS laws, regulations, and policies and the purpose of the parkway, the DEIS/GMP describes the NPS preferred alternative-- Alternative... public on the DEIS/GMP for at least 60 days, starting from the date the Environmental Protection Agency...

  16. An Advanced Multiple Alternatives Modeling Formulation for Determining Graduated Fiscal Support Strategies for Operational and Planned Educational Programs.

    ERIC Educational Resources Information Center

    Wholeben, Brent Edward

    A rationale is presented for viewing the decision-making process inherent in determining budget reductions for educational programs as most effectively modeled by a graduated funding approach. The major tenets of the graduated budget reduction approach to educational fiscal policy include the development of multiple alternative reduction plans, or…

  17. Foothills Parkway Section 8B Final Environmental Report, Volume 6, Appendix N

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blasing, T.J.; Cada, G.F.; Carer, M.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NPS, GSMNP, and ORNL staff interacted with Federal Highway Administration staffmore » to develop a conceptual design plan for Section 8B with the intent of protecting critical resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this ER, there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constructing Section 8B with an interchange at SR 416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER documents the results of the architectural, historical, and cultural resources assessment for the entire Section 8B ROW that was completed in May 1995 to document the architectural, historical, and cultural resources located within the project area. The assessment included evaluation of the potential for cultural (i.e., rural historic) landscapes in the area of the ROW. The assessment showed that one National Register-listed property is located 0.3 mile south of the ROW, and seven properties appear to meet National Register criteria. For six of these seven sites, no audible or visual effects were predicted to result from the construction and operation of the build alternatives of Section 8B. Three areas were evaluated to determine if they could be considered rural historic landscapes: the Cosby Valley, Pittman Center, and Rocky Flats. None of these landscapes met National Register criteria for rural historic landscapes.« less

  18. 7 CFR Appendix A to Part 225 - Alternate Foods for Meals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Used in the Summer Food Service Program? 1. An alternate protein product used in meals planned under..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How Are Alternate Protein Products Used in the Summer Food Service Program? 1...

  19. 7 CFR Appendix A to Part 225 - Alternate Foods for Meals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Used in the Summer Food Service Program? 1. An alternate protein product used in meals planned under..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How Are Alternate Protein Products Used in the Summer Food Service Program? 1...

  20. 7 CFR Appendix A to Part 225 - Alternate Foods for Meals

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Used in the Summer Food Service Program? 1. An alternate protein product used in meals planned under..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How Are Alternate Protein Products Used in the Summer Food Service Program? 1...

  1. 7 CFR Appendix A to Part 225 - Alternate Foods for Meals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Used in the Summer Food Service Program? 1. An alternate protein product used in meals planned under..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How Are Alternate Protein Products Used in the Summer Food Service Program? 1...

  2. 7 CFR Appendix A to Part 225 - Alternate Foods for Meals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Used in the Summer Food Service Program? 1. An alternate protein product used in meals planned under..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How Are Alternate Protein Products Used in the Summer Food Service Program? 1...

  3. KSC-2009-4330

    NASA Image and Video Library

    2009-07-30

    CAPE CANAVERAL, Fla. – Members of the Augustine Commission are meeting in Cocoa Beach, Fla. At left is Chairman Norman R. Augustine, retired chairman and CEO of Lockheed Martin Corp., and, at right, is Phil McAlister, special assistant for Program Analysis in NASA's Office of Program Analysis and Evaluation. At the request of the Office of Science and Technology Policy, NASA established the Review of U.S. Human Space Flight Plans Committee, known as the Augustine Commission. The committee is conducting an independent review of ongoing U.S. human spaceflight plans and programs, as well as alternatives, to ensure the nation is pursuing the best trajectory for the future of human space flight - one that is safe, innovative, affordable, and sustainable. Photo credit: NASA/Kim Shiflett

  4. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less

  5. Adaptation strategies for water supply management in a drought prone Mediterranean river basin: Application of outranking method.

    PubMed

    Kumar, Vikas; Del Vasto-Terrientes, Luis; Valls, Aida; Schuhmacher, Marta

    2016-01-01

    The regional water allocation planning is one of those complex decision problems where holistic approach to water supply management considering different criteria would be valuable. However, multi-criteria decision making with diverse indicators measured on different scales and uncertainty levels is difficult to solve. Objective of this paper is to develop scenarios for the future imbalances in water supply and demand for a water stressed Mediterranean area of Northern Spain (Tarragona) and to test the applicability and suitability of an outranking method ELECTRE-III-H for evaluating sectoral water allocation policies. This study is focused on the use of alternative water supply scenarios to fulfil the demand of water from three major sectors: domestic, industrial and agricultural. A detail scenario planning for regional water demand and supply has been discussed. For each future scenario of climate change, the goal is to obtain a ranking of a set of possible actions with regards to different types of indicators (costs, water stress and environmental impact). The analytical method used is based on outranking models for decision aid with hierarchical structures of criteria and ranking alternatives using partial preorders based on pairwise preference relations. We compare several adaptation measures including alternative water sources (reclaimed water and desalination); inter basin water transfer and sectoral demand management coming from industry, agriculture and domestic sectors and tested the sustainability of management actions for different climate change scenarios. Results have shown use of alternative water resources as the most reliable alternative with medium reclaimed water reuse in industry and agriculture and low to medium use of desalination water in domestic and industrial sectors as the best alternative. The proposed method has several advantages such as the management of heterogeneous scales of measurement without requiring any artificial transformation and the management of uncertainty by means of comparisons at a qualitative level in terms of the decision maker preferences. Copyright © 2015 Elsevier B.V. All rights reserved.

  6. Joint Test Report for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

    NASA Technical Reports Server (NTRS)

    Lewis, Pattie

    2007-01-01

    Headquarters National Aeronautics and Space Administration (NASA) chartered the NASA Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate hazardous materials through joint center cooperation and technology sharing. The objective of this project was to qualify candidate alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel applications at NASA facilities. This project compares the surface preparation/depainting performance of the proposed alternatives to existing surface preparation/depainting systems or standards. This Joint Test Report (JTR) contains the results of testing as per the outlines of the Joint Test Protocol (JTP), Joint Test Protocol for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, and the Field Test Plan (FTP), Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel, for critical requirements and tests necessary to qualify alternatives for coating removal systems. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of government and industry participants. This JTR documents the results of the testing as well as any test modifications made during the execution of the project. This JTR is made available as a reference for future pollution prevention endeavors by other NASA Centers, the Department of Defense and commercial users to minimize duplication of effort. The current coating removal processes identified herein are for polyurethane, epoxy and other paint systems applied by conventional wet-spray processes. A table summarizes the target hazardous materials, processes and materials, applications, affected programs, and candidate substrates.

  7. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less

  8. The effect of consumer incentives on Medicaid beneficiaries' compliance with well-child visit guidelines.

    PubMed

    Nyman, John A; Abraham, Jean M; Riley, William

    2013-01-01

    The Affordable Care Act of 2010 recommends that consumer incentives be employed to increase the use of preventive care by Medicaid beneficiaries, but few evaluative studies exist. This study evaluates a Target gift card incentive employed by a Minnesota health plan serving Medicaid beneficiaries over the period 2002-2003. Lacking a contemporaneous control group, the proximity between the child's residence and the nearest Target store was used as the intervention variable. Using alternative specifications for the intervention variable, results of the difference-in-differences equations suggest that the incentive program significantly increased the likelihood that a Medicaid beneficiary would have a well-child visit.

  9. Performance-costs evaluation for urban storm drainage.

    PubMed

    Baptista, M; Barraud, S; Alfakih, E; Nascimento, N; Fernandes, W; Moura, P; Castro, L

    2005-01-01

    The design process of urban stormwater systems incorporating BMPs involves more complexity unlike the design of classic drainage systems for which just the technique of pipes is likely to be used. This paper presents a simple decision aid methodology and an associated software (AvDren) concerning urban stormwater systems, devoted to the evaluation and the comparison of drainage scenarios using BMPs according to different technical, sanitary, social environmental and economical aspects. This kind of tool is particularly interesting so as to help the decision makers to select the appropriate alternative and to plan the investments especially for developing countries, with important sanitary problems and severe budget restrictions.

  10. Decision analysis to support development of the Glen Canyon Dam long-term experimental and management plan

    USGS Publications Warehouse

    Runge, Michael C.; LaGory, Kirk E.; Russell, Kendra; Balsom, Janet R.; Butler, R. Alan; Coggins,, Lewis G.; Grantz, Katrina A.; Hayse, John; Hlohowskyj, Ihor; Korman, Josh; May, James E.; O'Rourke, Daniel J.; Poch, Leslie A.; Prairie, James R.; VanKuiken, Jack C.; Van Lonkhuyzen, Robert A.; Varyu, David R.; Verhaaren, Bruce T.; Veselka, Thomas D.; Williams, Nicholas T.; Wuthrich, Kelsey K.; Yackulic, Charles B.; Billerbeck, Robert P.; Knowles, Glen W.

    2016-01-07

    The results of the decision analysis are meant to serve as only one of many sources of information that can be used to evaluate the alternatives proposed in the Environmental Impact Statement. These results only focus on those resource goals for which quantitative performance metrics could be formulated and evaluated; there are other important aspects of the resource goals that also need to be considered. Not all the stakeholders who were invited to participate in the decision analysis chose to do so; thus, the Bureau of Reclamation, National Park Service, and U.S. Department of Interior may want to consider other input.

  11. 29 CFR 2520.101-6 - Multiemployer pension plan information made available on request.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... “periodic actuarial report” means any— (i) Actuarial report prepared by an actuary of the plan and received... plan from an actuary of the plan that depicts alternative funding scenarios based on a range of...

  12. 29 CFR 2520.101-6 - Multiemployer pension plan information made available on request.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... “periodic actuarial report” means any— (i) Actuarial report prepared by an actuary of the plan and received... plan from an actuary of the plan that depicts alternative funding scenarios based on a range of...

  13. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    NASA Astrophysics Data System (ADS)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  14. Reaching out and reaching up - developing a low cost drug treatment system in Cambodia

    PubMed Central

    2012-01-01

    Cambodia, confronted by the spread of drug misuse among young people, requested support from international agencies to develop a drug treatment programme in 2000. The initial plan developed by the United Nations Office on Drugs and Crime was to set up a number of conventional drug treatment centres in urban areas. During the planning phase, however, the project was redesigned as a community based outreach programme. Ten Community Counselling Teams have been formed and trained in pilot areas, and within the first year of operation 462 drug and alcohol users contacted. Comprising former drug users, family members affected by drug use and health care staff, they have drug scene credibility, local knowledge and connectivity, and a rudimentary level of medical competence. Crucially, they enjoy the support of village elders, who are involved in the planning and reporting stages. While the Community Counselling Teams with their basic training in addiction counselling are in no position as yet to either provide or refer clients to treatment, they can provide brief interventions, organise self help groups, and most importantly provide an alternative to law enforcement. By taking a development centred approach, with emphasis on community, empowerment and inclusion, it provides a constructive and inclusive alternative to medical approaches and the compulsory drug treatment centres. The paper is based on an evaluation involving interviews with a range of stakeholders and a review of project documents. PMID:22410105

  15. Santa Rosa Island Mission Utilization Plan Programmatic Environmental Assessment

    DTIC Science & Technology

    2005-03-01

    subject areas with the greatest likelihood for potential environmental impacts. In each case, the assessment found that the preferred alternative would...7061, "The Environmental Impact Analysis Process"). Selection of Alternative 3, the preferred alternative, of the Santa Rosa Island Mission... Preferred Alternative ...............................................................................................................................2-12

  16. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    PubMed

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  17. Comparative Study of Four Membranes for Evaluation of New Insect/Arthropod Repellents Using Aedes aegypti

    DTIC Science & Technology

    2008-01-01

    market and had no plans to continuously provide the membranes. Thus, in an effort to find an alternative iu t•itro membrane test system, our initial...Professional: R Chandra Sekhar Junior SponsoriDg Editor: Nimisha Gorwami Manager-sales & Marketing : S Girish Controller-Production: Rajender P Ghansela...DDA Market , Paschim Vihar, New Delhi 110 063, and printed at Sai Printo Pack Pvt. Ltd., A-102/4, Okhla Industrial Area, Phase II. New Delhi 110 020

  18. Analysis of the Air Force Logistics Enterprise. Evaluation of Global Repair Network Options for Supporting the F-16 and KC-135

    DTIC Science & Technology

    2009-01-01

    Approved for public release; distribution unlimited PROJECT AIR FORCE Ronald G. McGarvey, Manuel Carrillo, Douglas C. Cato, Jr., John G. Drew, Thomas Lang...Planning Framework, Robert S. Tripp, Lionel A. Galway, Paul Killingsworth, Eric Peltz, Timothy Ramey, and John G. Drew (MR-1056-AF). This report describes...Robert S. Tripp, Timothy Ramey, and John G. Drew (MR-1174-AF). This report examines alternatives for meeting F-15 avionics maintenance requirements

  19. Farewell to Arms: A Plan for Evaluating the 2001 Authorization for Use of Military Force and Its Alternatives

    DTIC Science & Technology

    2014-09-01

    the constitution is not a suicide pact, and the President has unchallenged authority to prevent an imminent threat to the United States.”242 In...long. It soon wastes, exhausts, and murders itself. There was never a democracy yet that did not commit suicide .”291 The judiciary has deferred to...Constitution Project aptly describes, “When national security decisions are said to rest on secret information not widely shared with Congress, the temptation

  20. CORRRECTIVE ACTION DECISION DOCUMENT FOR CORRECTIVE ACTION UNIT 427: AREA 3 SEPTIC WASTE SYSTEMS 2 AND 6, TONOPAH TEST RANGE, NEVADA, REVISION 0, JUNE 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ITLV.

    1998-06-01

    This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less

  1. 75 FR 14623 - Notice of Availability of the Draft Imperial Sand Dunes Recreation Area Management Plan and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... Concern (ACEC), Plank Road and East Mesa. The preferred alternative would continue the 298-acre Plank Road... preferred alternative would reduce the East Mesa ACEC from 6,454 acres to 5,799 acres, which overlaps the Planning Area. The East Mesa ACEC would continue to protect biological resources and other resource values...

  2. Alternative Break Programs and the Factors that Contribute to Changes in Students' Lives

    ERIC Educational Resources Information Center

    Niehaus, Elizabeth Kathleen

    2012-01-01

    The purpose of this study was to explore the extent to and ways in which student participants in Alternative Break (AB) programs report that their AB experience influenced their intentions or plans to volunteer, engage in advocacy, or study or travel abroad, or their major or career plans. Additional analysis explored the specific program…

  3. Scenic beauty estimation model: predicting perceived beauty of forest landscapes

    Treesearch

    Terry C. Daniel; Herbert Schroeder

    1979-01-01

    An important activity in any land-use planning process is prediction of the consequences of alternative management approaches. Alternative plans must be com-pared in terms of their respective costs (economic and environmental) and benefits (in market and non-market values) if rational choice among them is to be made. The purpose of this paper is to describe a model for...

  4. Strategy for distribution of influenza vaccine to high-risk groups and children.

    PubMed

    Longini, Ira M; Halloran, M Elizabeth

    2005-02-15

    Despite evidence that vaccinating schoolchildren against influenza is effective in limiting community-level transmission, the United States has had a long-standing government strategy of recommending that vaccine be concentrated primarily in high-risk groups and distributed to those people who keep the health system and social infrastructure operating. Because of this year's influenza vaccine shortage, a plan was enacted to distribute the limited vaccine stock to these groups first. This vaccination strategy, based on direct protection of those most at risk, has not been very effective in reducing influenza morbidity and mortality. Although it is too late to make changes this year, the current influenza vaccine crisis affords the opportunity to examine an alternative for future years. The alternative plan, supported by mathematical models and influenza field studies, would be to concentrate vaccine in schoolchildren, the population group most responsible for transmission, while also covering the reachable high-risk groups, who would also receive considerable indirect protection. In conjunction with a plan to ensure an adequate vaccine supply, this alternative influenza vaccination strategy would help control interpandemic influenza and be instrumental in preparing for pandemic influenza. The effectiveness of the alternative plan could be assessed through nationwide community studies.

  5. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neubauer, J.; Pesaran, A.

    2013-03-01

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratorymore » has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.« less

  6. Techno-Economic Analysis of BEV Service Providers Offering Battery Swapping Services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neubauer, J. S.; Pesaran, A.

    2013-01-01

    Battery electric vehicles (BEVs) offer the potential to reduce both oil imports and greenhouse gas emissions, but high upfront costs, battery-limited vehicle range, and concern over high battery replacement costs may discourage potential buyers. A subscription model in which a service provider owns the battery and supplies access to battery swapping infrastructure could reduce upfront and replacement costs for batteries with a predictable monthly fee, while expanding BEV range. Assessing the costs and benefits of such a proposal are complicated by many factors, including customer drive patterns, the amount of required infrastructure, battery life, etc. The National Renewable Energy Laboratorymore » has applied its Battery Ownership Model to compare the economics and utility of BEV battery swapping service plan options to more traditional direct ownership options. Our evaluation process followed four steps: (1) identifying drive patterns best suited to battery swapping service plans, (2) modeling service usage statistics for the selected drive patterns, (3) calculating the cost-of-service plan options, and (4) evaluating the economics of individual drivers under realistically priced service plans. A service plan option can be more cost-effective than direct ownership for drivers who wish to operate a BEV as their primary vehicle where alternative options for travel beyond the single-charge range are expensive, and a full-coverage-yet-cost-effective regional infrastructure network can be deployed. However, when assumed cost of gasoline, tax structure, and absence of purchase incentives are factored in, our calculations show the service plan BEV is rarely more cost-effective than direct ownership of a conventional vehicle.« less

  7. 7 CFR Appendix A to Part 226 - Alternate Foods for Meals

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... used in the Child and Adult Care Food Program? 1. An alternate protein product used in meals planned..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How are alternate protein products used in the Child and Adult Care Food Program? 1...

  8. 7 CFR Appendix A to Part 226 - Alternate Foods for Meals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... used in the Child and Adult Care Food Program? 1. An alternate protein product used in meals planned..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How are alternate protein products used in the Child and Adult Care Food Program? 1...

  9. 7 CFR Appendix A to Part 226 - Alternate Foods for Meals

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... used in the Child and Adult Care Food Program? 1. An alternate protein product used in meals planned..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How are alternate protein products used in the Child and Adult Care Food Program? 1...

  10. 7 CFR Appendix A to Part 226 - Alternate Foods for Meals

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... used in the Child and Adult Care Food Program? 1. An alternate protein product used in meals planned..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How are alternate protein products used in the Child and Adult Care Food Program? 1...

  11. 7 CFR Appendix A to Part 226 - Alternate Foods for Meals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... used in the Child and Adult Care Food Program? 1. An alternate protein product used in meals planned..., manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the... meat alternates. B. How are alternate protein products used in the Child and Adult Care Food Program? 1...

  12. Habitat suitability index models: A low effort system for planned coolwater and coldwater reservoirs

    USGS Publications Warehouse

    McConnell, William J.; Bergersen, Eric P.; Williamson, Kathryn L.

    1982-01-01

    A novel approach to reservoir habitat evaluation is described and habitat ratings are proposed for five fish species in coolwater and coldwater reservoirs. This approach has the advantages of procedural simplicity and ready availability of input data; consequently, it has potential utility as a screening tool in the early stages of the reservoir planning process.Habitat suitability is determined on the basis of a composite score for five "primary" reservoir attributes (temperature, turbidity, nonliving cover, drawdown, and shallow cove frequency). The va 1ue of each primary reservoi r attribute is determined from one or more "secondary" attributes, which are easily measured variables. Secondary attributes (for example, length of growing season or mean July air temperature) can be directly obtained, prior to construction, from published documents, maps, reservoir plans, and on-site inspections of the proposed reservoir basin.Evaluation criteria and ratings are presented for rainbow trout (Salmo gairdneri), white sucker (Catostomus commersonii), yellow perch (Perca flavescens), common carp (Cyprinus carpio), and black crappie (PomoxTS nigromaculatus). These ratings were derived from literature reviews and from persona 1 experi ence and knowl edge of the authors; however, the system is easily adaptable to change upon further review, differences of opinion by experts, or evaluation of test results under diverse conditions.This technique can be used to evaluate the suitability of a proposed reservoir for different species and to compare the outcomes of alternative construction plans. It could also be expanded to include additional species, which will improve its utility. The system should be useful in determining losses relative to benefits, trade-offs, and potential mitigation measures in reservoir projects.

  13. Planning for the Rheumatologist Workforce: Factors Associated With Work Hours and Volumes.

    PubMed

    Barber, Claire E H; Nasr, Mina; Barnabe, Cheryl; Badley, Elizabeth M; Lacaille, Diane; Pope, Janet; Cividino, Alfred; Yacyshyn, Elaine; Baillie, Cory; Mosher, Dianne; Thomson, John G; Charnock, Christine; Thorne, J Carter; Zummer, Michel; Brophy, Julie; Ruban, Thanu Nadarajah; Ahluwalia, Vandana; McDougall, Robert; Marshall, Deborah A

    2018-05-25

    The aim of this study was to evaluate factors associated with rheumatologists' clinical work hours and patient volumes based on a national workforce survey in rheumatology. Adult rheumatologists who participated in a 2015 workforce survey were included (n = 255). Univariate analysis evaluated the relationship between demographics (sex, age, academic vs. community practice, billing fee for service vs. other plan, years in practice, retirement plans) and workload (total hours and number of ½-day clinics per week) or patient volumes (number of new and follow-up consults per week). Multiple linear regression models were used to evaluate the relationship between practice type, sex, age, and working hours or clinical volumes. Male rheumatologists had more ½-day clinics (P = 0.05) and saw more new patients per week (P = 0.001) compared with females. Community rheumatologists had more ½-day clinics and new and follow-up visits per week (all P < 0.01). Fee-for-service rheumatologists reported more ½-day clinics per week (P < 0.001) and follow-ups (P = 0.04). Workload did not vary by age, years in practice, or retirement plans. In multivariate analysis, community practice remained independently associated with higher patient volumes and more clinics per week. Female rheumatologists reported fewer clinics and fewer follow-up patients per week than males, but this did not affect the duration of working hours or new consultations. Age was not associated with work volumes or hours. Practice type and rheumatologist sex should be considered when evaluating rheumatologist workforce needs, as the proportion of female rheumatologists has increased over time and alternative billing practices have been introduced in many centers.

  14. TH-CD-209-01: A Greedy Reassignment Algorithm for the PBS Minimum Monitor Unit Constraint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Y; Kooy, H; Craft, D

    2016-06-15

    Purpose: To investigate a Greedy Reassignment algorithm in order to mitigate the effects of low weight spots in proton pencil beam scanning (PBS) treatment plans. Methods: To convert a plan from the treatment planning system’s (TPS) to a deliverable plan, post processing methods can be used to adjust the spot maps to meets the minimum MU constraint. Existing methods include: deleting low weight spots (Cut method), or rounding spots with weight above/below half the limit up/down to the limit/zero (Round method). An alternative method called Greedy Reassignment was developed in this work in which the lowest weight spot in themore » field was removed and its weight reassigned equally among its nearest neighbors. The process was repeated with the next lowest weight spot until all spots in the field were above the MU constraint. The algorithm performance was evaluated using plans collected from 190 patients (496 fields) treated at our facility. The evaluation criteria were the γ-index pass rate comparing the pre-processed and post-processed dose distributions. A planning metric was further developed to predict the impact of post-processing on treatment plans for various treatment planning, machine, and dose tolerance parameters. Results: For fields with a gamma pass rate of 90±1%, the metric has a standard deviation equal to 18% of the centroid value. This showed that the metric and γ-index pass rate are correlated for the Greedy Reassignment algorithm. Using a 3rd order polynomial fit to the data, the Greedy Reassignment method had 1.8 times better metric at 90% pass rate compared to other post-processing methods. Conclusion: We showed that the Greedy Reassignment method yields deliverable plans that are closest to the optimized-without-MU-constraint plan from the TPS. The metric developed in this work could help design the minimum MU threshold with the goal of keeping the γ-index pass rate above an acceptable value.« less

  15. SU-E-T-392: Evaluation of Ion Chamber/film and Log File Based QA to Detect Delivery Errors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, C; Mason, B; Kirsner, S

    2015-06-15

    Purpose: Ion chamber and film (ICAF) is a method used to verify patient dose prior to treatment. More recently, log file based QA has been shown as an alternative for measurement based QA. In this study, we delivered VMAT plans with and without errors to determine if ICAF and/or log file based QA was able to detect the errors. Methods: Using two VMAT patients, the original treatment plan plus 7 additional plans with delivery errors introduced were generated and delivered. The erroneous plans had gantry, collimator, MLC, gantry and collimator, collimator and MLC, MLC and gantry, and gantry, collimator, andmore » MLC errors. The gantry and collimator errors were off by 4{sup 0} for one of the two arcs. The MLC error introduced was one in which the opening aperture didn’t move throughout the delivery of the field. For each delivery, an ICAF measurement was made as well as a dose comparison based upon log files. Passing criteria to evaluate the plans were ion chamber less and 5% and film 90% of pixels pass the 3mm/3% gamma analysis(GA). For log file analysis 90% of voxels pass the 3mm/3% 3D GA and beam parameters match what was in the plan. Results: Two original plans were delivered and passed both ICAF and log file base QA. Both ICAF and log file QA met the dosimetry criteria on 4 of the 12 erroneous cases analyzed (2 cases were not analyzed). For the log file analysis, all 12 erroneous plans alerted a mismatch in delivery versus what was planned. The 8 plans that didn’t meet criteria all had MLC errors. Conclusion: Our study demonstrates that log file based pre-treatment QA was able to detect small errors that may not be detected using an ICAF and both methods of were able to detect larger delivery errors.« less

  16. Poster — Thur Eve — 36: Implementation of constant dose rate and gantry speed arc therapy(CDR-CAS-IMAT) for thoracic esophageal carcinoma on Varian 23EX

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Ruohui; Department of Medical Physics, Medical Faculty Mannheim, Heidelberg University; Fan, Xiaomei

    2014-08-15

    Objective: The purpose of this study is to propose an alternative planning approach for VMAT using constant dose rate and gantry speed arc therapy(CDR-CAS-IMAT) implementation on conventional Linac Varian 23EX and used IMRT as a benchmark to evaluate the performance. Methods and materials: Eighteen patients with thoracic esophageal carcinoma who were previously treated with IMRT on Varian 23EX were retrospectively planned for CDR-CAS-IMAT plans. Dose prescription was set to 60 Gy to PTVs in 30 fractions. The planning objectives for PTVs and OAR were corresponding with the IMRT plans. Dose to the PTVs and OAR were compared to IMRT withmore » respect to plan quality, MU, treatment time and delivery accuracy. Results: CDR-CAS-IMAT plans led to equivalent or superior plan quality as compared to IMRT, PTV's CI relative increased 16.2%, while small deviations were observed on minimum dose for PTV. Volumes in the cord receiving 40Gy were increased from 3.6% with IMRT to 7.0%. Treatment times were reduced significantly with CDR-CAS-IMAT(mean 85.7s vs. 232.1s, p < .05), however, MU increased by a factor of 1.3 and lung V10/5/3.5/aver were relative increase 6.7%,12%,17.9%,4.2%, respectively. And increased the E-P low dose area volume decreased the hight dose area. There were no significant difference in Delta4 measurements results between both planning techniques. Conclusion: CDR-CAS-IMAT plans can be implemented smoothly and quickly into a busy cancer center, which improved PTV CI and reduces treatment time but increased the MU and low dose irradiated area. An evaluation of weight loss must be performed during treatment for CDR-CAS-IMAT patients.« less

  17. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Syh, J; Ding, X; Syh, J

    2015-06-15

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less

  18. 30 CFR 250.1504 - May I use alternative training methods?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be conducted according to, and meet the objectives of, your training plan. ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I use alternative training methods? 250... Safety Training § 250.1504 May I use alternative training methods? You may use alternative training...

  19. 33 CFR 155.5061 - Alternative Training and Exercise Program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Alternative Training and Exercise... Nontank Vessel Response Plans § 155.5061 Alternative Training and Exercise Program. (a) Owners or... exercise requirements of §§ 155.5055 and 155.5060, may meet an Alternative Training and Exercise Program...

  20. 10 CFR 905.16 - What are the requirements for the minimum investment report alternative?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... report alternative? 905.16 Section 905.16 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT...; renewable energy; efficiency and alternative energy-related research and development; low-income energy... collected for and spent on DSM, renewable energy, efficiency or alternative energy-related research and...

  1. 10 CFR 905.16 - What are the requirements for the minimum investment report alternative?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... report alternative? 905.16 Section 905.16 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT...; renewable energy; efficiency and alternative energy-related research and development; low-income energy... collected for and spent on DSM, renewable energy, efficiency or alternative energy-related research and...

  2. 10 CFR 905.16 - What are the requirements for the minimum investment report alternative?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... report alternative? 905.16 Section 905.16 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT...; renewable energy; efficiency and alternative energy-related research and development; low-income energy... collected for and spent on DSM, renewable energy, efficiency or alternative energy-related research and...

  3. 10 CFR 905.16 - What are the requirements for the minimum investment report alternative?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... report alternative? 905.16 Section 905.16 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT...; renewable energy; efficiency and alternative energy-related research and development; low-income energy... collected for and spent on DSM, renewable energy, efficiency or alternative energy-related research and...

  4. 75 FR 11186 - National Center for Complementary and Alternative Medicine Announcement of Workshop on Natural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Complementary and Alternative Medicine Announcement of Workshop on Natural Products ACTION: Notice. SUMMARY: As part of its strategic planning process, the National Center for Complementary and Alternative Medicine... attend. Seating is limited. Background: The National Center for Complementary and Alternative Medicine...

  5. 7 CFR Appendix A to Part 220 - Alternate Foods for Meals

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in the School Breakfast Program? 1. An alternate protein product used in meals planned under the food... an alternate protein product mix, manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the package; (2) Hydration instructions; and (3) instructions...

  6. 7 CFR Appendix A to Part 220 - Alternate Foods for Meals

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in the School Breakfast Program? 1. An alternate protein product used in meals planned under the food... an alternate protein product mix, manufacturers should provide information on: (1) The amount by weight of dry alternate protein product in the package; (2) Hydration instructions; and (3) instructions...

  7. Evaluation of Larynx-Sparing Techniques With IMRT When Treating the Head and Neck

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Webster, Gareth J.; Rowbottom, Carl G.; Ho, Kean F.

    2008-10-01

    Purpose: Concern exists that widespread implementation of whole-field intensity-modulated radiotherapy (IMRT) for the treatment of head-and-neck cancer has resulted in increased levels of dysphagia relative to those seen with conventional planning. Other investigators have suggested an alternative junctioned-IMRT (J-IMRT) method, which matches an IMRT plan to a centrally blocked neck field to restrict the laryngeal dose and reduce dysphagia. The effect on target coverage and sparing of organs at risk, including laryngeal sparing, in the optimization was evaluated and compared with that achieved using a J-IMRT technique. Methods and Materials: A total of 13 oropharyngeal cancer whole-field IMRT plans weremore » planned with and without including laryngeal sparing in the optimization. A comparison of the target coverage and sparing of organs at risk was made using the resulting dose-volume histograms and dose distribution. The nine plans with disease located superior to the level of the larynx were replanned using a series of J-IMRT techniques to compare the two laryngeal-sparing techniques. Results: An average mean larynx dose of 29.1 Gy was achieved if disease did not extend to the level of the larynx, with 38.8 Gy for disease extending inferiorly and close to the larynx (reduced from 46.2 and 47.7 Gy, respectively, without laryngeal sparing). Additional laryngeal sparing could be achieved with J-IMRT (mean dose 24.4 Gy), although often at the expense of significantly reduced coverage of the target volume and with no improvement to other areas of the IMRT plan. Conclusion: The benefits of J-IMRT can be achieved with whole-field IMRT if laryngeal sparing is incorporated into the class solution. Inclusion of laryngeal sparing had no effect on other parameters in the plan.« less

  8. Is Participatory Action Research an innovative pedagogical alternative for training teachers as researchers? The training plan and evaluation for normal schools.

    PubMed

    Paredes-Chi, Arely Anahy; Castillo-Burguete, María Teresa

    2018-06-01

    Normal schools in Mexico train teachers for basic level education. Classified as Higher Education Institutions, part of their mandate is to conduct scientific research to improve educational quality. Currently, normal school students can meet graduation requirements by either writing a thesis or reporting on professional practice using Participatory Action Research (PAR). Teachers at normal schools have only limited experience in conducting and supervising PAR projects. With the aim of analyzing the situation and addressing this paradox, we used PAR to develop a plan to train normal school teachers in application of PAR methodology. We present the training proposal and evaluate its results in a pilot phase. These suggest that PAR represents an innovative option for training teachers to conduct research and therefore fulfill part of their responsibilities at normal schools in Mexico. Changes in institutional culture and structure would be required for successful implementation of PAR in this context. Copyright © 2018 Elsevier Ltd. All rights reserved.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediationmore » alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process.« less

  10. Regional economic impacts of current and proposed management alternatives for Don Edwards National Wildlife Refuge

    USGS Publications Warehouse

    Richardson, Leslie; Huber, Chris; Koontz, Lynne

    2012-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan. The Comprehensive Conservation Plan must describe the desired future conditions of a Refuge and provide long-range guidance and management direction to achieve refuge purposes. The Don Edwards San Francisco Bay National Wildlife Refuge, located at the south end of California's San Francisco Bay and one of seven refuges in the San Francisco Bay National Wildlife Refuge Complex, is in the process of developing a range of management goals, objectives, and strategies for the Comprehensive Conservation Plan. The Comprehensive Conservation Plan must contain an analysis of expected effects associated with current and proposed Refuge management strategies. For Refuge Comprehensive Conservation Plan planning, a regional economic analysis provides a means of estimating how current management (No Action Alternative) and proposed management activities (alternatives) affect the local economy. This type of analysis provides two critical pieces of information: (1) it illustrates the Don Edwards San Francisco Bay National Wildlife Refuge's contribution to the local community, and (2) it can help in determining whether economic effects are or are not a real concern in choosing among management alternatives. This report first presents a description of the local community and economy near the Don Edwards San Francisco Bay National Wildlife Refuge. Next, the methods used to conduct a regional economic impact analysis are described. An analysis of the final Comprehensive Conservation Plan management strategies that could affect stakeholders, residents, and the local economy is then presented. The management activities of economic concern in this analysis are: * Spending in the local community by Refuge visitors; * Refuge personnel salary spending; and * Refuge purchases of goods and services within the local community.

  11. Alternatives across Latin America: catalysing change in the curriculum.

    PubMed

    Jukes, Nick

    2009-01-01

    A 6-week series of seminars addressing replacement of harmful animal use in education and training was held across Latin America in March-April 2008. Organised by InterNICHE and partner organisations in Bolivia, Peru, Brazil, Argentina and Mexico, the events built on the experience of previous major outreach in Russia and India. Up to 6 full-day seminars were held at universities and independent venues in each country. Smaller meetings with campaigners, teachers and professional bodies complemented the large presentations. All events included spoken presentations, demonstrations and free trials of a wide range of alternatives. Speakers included InterNICHE experts and those from the host countries who are involved in replacement work. Partner organisations were empowered through the process of planning and execution of the seminars, and the tour helped to identify and provide support to others who are progressing humane education initiatives. Further collaboration is now planned. Information on the current situation concerning animal use and alternatives, including laws and regulations, was also gathered from each country. The tour succeeded in raising awareness and generating interest in replacement alternatives, also by national-level interviews and media coverage. Information and freeware alternatives were widely distributed, and further translations of material into Spanish and Portuguese are in progress. To continue the hands-on access to alternatives provided at the seminars, a Mexican / Central American Alternatives Loan System has been established, and others are being built in Peru and Brasil. The donation of computers and alternatives to selected universities is also being planned in order to establish multimedia laboratories that will promote alternatives through example.

  12. 12 CFR 195.27 - Strategic plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Assessing Performance § 195.27 Strategic plan. (a) Alternative election. The appropriate Federal banking... under an approved plan for at least one year. (b) Data reporting. The appropriate Federal banking agency... any multi-year plan must include annual interim measurable goals under which the appropriate Federal...

  13. 12 CFR 195.27 - Strategic plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Assessing Performance § 195.27 Strategic plan. (a) Alternative election. The appropriate Federal banking... under an approved plan for at least one year. (b) Data reporting. The appropriate Federal banking agency... any multi-year plan must include annual interim measurable goals under which the appropriate Federal...

  14. 12 CFR 195.27 - Strategic plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Assessing Performance § 195.27 Strategic plan. (a) Alternative election. The appropriate Federal banking... under an approved plan for at least one year. (b) Data reporting. The appropriate Federal banking agency... any multi-year plan must include annual interim measurable goals under which the appropriate Federal...

  15. 30 CFR 285.623-285.625 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Construction and Operations Plan for Commercial Leases §§ 285.623-285.625 [Reserved] Contents of the Construction and Operations Plan ...

  16. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  17. 12 CFR 345.27 - Strategic plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Strategic plan. 345.27 Section 345.27 Banks and... REINVESTMENT Standards for Assessing Performance § 345.27 Strategic plan. (a) Alternative election. The FDIC... strategic plan if: (1) The bank has submitted the plan to the FDIC as provided for in this section; (2) The...

  18. 48 CFR 2406.202 - Establishing or maintaining alternative sources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintaining alternative sources. 2406.202 Section 2406.202 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Full and Open Competition After Exclusion of Sources 2406.202 Establishing or maintaining alternative...

  19. Technoeconomic aspects of alternative municipal solid wastes treatment methods.

    PubMed

    Economopoulos, Alexander P

    2010-04-01

    This paper considers selected treatment technologies for comingled domestic and similar wastes and provides technoeconomic data and information, useful for the development of strategic management plans. For this purpose, treatment technologies of interest are reviewed and representative flow diagrams, along with material and energy balances, are presented for the typical composition of wastes in Greece; possible difficulties in the use of treatment products, along with their management implications, are discussed, and; cost functions are developed, allowing assessment of the initial capital investment and annual operating costs. Based on the latter, cost functions are developed for predicting the normalized treatment costs of alternative methods (in euro/t of MSW treated), as function of the quantity of MSW processed by plants built and operated (a) by municipality associations, and (b) by private enterprises. Finally, the alternative technologies considered are evaluated on the basis of their cost aspects, product utilization and compatibility with the EU waste framework Directive 2008/98. Copyright 2009 Elsevier Ltd. All rights reserved.

  20. Recommendation Method for Build-to-Order Products Considering Substitutability of Specifications and Stock Consumption Balance of Components

    NASA Astrophysics Data System (ADS)

    Shimoda, Atsushi; Kosugi, Hidenori; Karino, Takafumi; Komoda, Norihisa

    This study focuses on a stock reduction method for build-to-order (BTO) products to flow surplus parts out to the market using sale by recommendation. A sale by recommendation is repeated in an each business negotiation using a recommended configuration selected from the inventory of parts to minimize the stock deficiency or excess at the end of a certain period of the production plan. The method is based on the potential of a customer specification to be replaced by an alternative one if the alternative one is close to the initial customer specification. A recommendation method is proposed that decides the recommended product configuration by balancing the part consumption so that the alternative specification of the configuration is close enough to the initial customer specification for substitutability. The method was evaluated by a simulation using real BTO manufacturing data and the result demonstrates that the unbalance of the consumption of parts inventory is improved.

  1. The American Medical Association Older Driver Curriculum for health professionals: changes in trainee confidence, attitudes, and practice behavior.

    PubMed

    Meuser, Thomas M; Carr, David B; Irmiter, Cheryl; Schwartzberg, Joanne G; Ulfarsson, Gudmundur F

    2010-01-01

    Few gerontology and geriatrics professionals receive training in driver fitness evaluation, state reporting of unfit drivers, or transportation mobility planning yet are often asked to address these concerns in the provision of care to older adults. The American Medical Association (AMA) developed an evidence-based, multi-media Curriculum to promote basic competences. This study evaluated reported changes in practice behaviors 3 months posttraining in 693 professionals trained via the AMA approach. Eight Teaching Teams, designated and trained by AMA staff, offered 22 training sessions across the United States in 2006 to 2007. Trainees (67% female; mean age 46) completed a pretest questionnaire and a posttest administered by mail. Physicians were the largest professional group (32%). Although many trainees acknowledged having conversations with patients about driving at pretest, few endorsed utilizing specific techniques recommended by the AMA prior to this training. The posttest response rate was 34% (n = 235). Significant improvements in reported attitudes, confidence, and practices were found across measured items. In particular, posttest data indicated new adoption of in-office screening techniques, chart documentation of driver safety concerns, and transportation alternative planning strategies. Findings suggest that a well-designed, one-time continuing education intervention can enhance health professional confidence and clinical practice concerning driver fitness evaluation and mobility planning. Targeted dissemination of this Curriculum (in-person and online) will allow more to benefit in the future.

  2. Measures of Success for Earth System Science Education: The DLESE Evaluation Services and the Evaluation Toolkit Collection

    NASA Astrophysics Data System (ADS)

    McCaffrey, M. S.; Buhr, S. M.; Lynds, S.

    2005-12-01

    Increased agency emphasis upon the integration of research and education coupled with the ability to provide students with access to digital background materials, learning activities and primary data sources has begun to revolutionize Earth science education in formal and informal settings. The DLESE Evaluation Services team and the related Evaluation Toolkit collection (http://www.dlese.org/cms/evalservices/ ) provides services and tools for education project leads and educators. Through the Evaluation Toolkit, educators may access high-quality digital materials to assess students' cognitive gains, examples of alternative assessments, and case studies and exemplars of authentic research. The DLESE Evaluation Services team provides support for those who are developing evaluation plans on an as-requested basis. In addition, the Toolkit provides authoritative peer reviewed articlesabout evaluation research techniques and strategies of particular importance to geoscience education. This paper will provide an overview of the DLESE Evaluation Toolkit and discuss challenges and best practices for assessing student learning and evaluating Earth system sciences education in a digital world.

  3. The Role of the Manufacturer in Air Transportation Planning

    NASA Technical Reports Server (NTRS)

    Mackenzie, J.

    1972-01-01

    The role of the aircraft manufacturer in the airline industry is considered. The process is illustrated by using a fictitious airline as an example--that is, a case study approach with Mid-Coast Airways serving as the example. Both in slide form and with supporting papers, a brief history of the airline, a description of its route structure and a forecast based on econometric analysis are presented. Once the forecast rationale is explained, information outlines the requirements for additional aircraft and the application of new aircraft across the system using alternative fleet plan options. The fleet plan is translated into financial summaries which indicate the relative merit of alternative aircraft types or operating plans.

  4. AAFES Shopping Center Environmental Assessment

    DTIC Science & Technology

    2009-08-01

    Plan H2S Hydrogen Sulfide SO2 Sulfur Dioxide HWMP Hazardous Waste Management Plan SMW Strategic Missile Wing ICBM Intercontinental Ballistic Missile...the no-action alternative. Land Management and Use. A waiver would be needed prior to construction to change the land use designation from Open...occur under the no-action alternative. Hazardous Materials and Waste Management . No changes to hazardous materials or waste streams would occur

  5. Scrambling the Nest Egg: How Well Do Teachers Understand Their Pensions, and What Do They Think about Alternative Pension Structures?

    ERIC Educational Resources Information Center

    DeArmond, Michael; Goldhaber, Dan

    2010-01-01

    In this article we focus on two questions: How well do teachers understand their current pension plans, and what do they think about alternative plan structures? The data come from administrative records and a 2006 survey of teachers in Washington State. The results suggest that Washington's teachers are fairly knowledgeable about their pensions,…

  6. Future Land Use Planning Alternatives for Alaska: One of a Series of Articles on the Native Land Claims.

    ERIC Educational Resources Information Center

    Parker, Walter B.

    As one in a series of eight articles written by different professionals concerned with Alaska Native land claims, this article focuses on land use planning alternatives after December of 1976 when the configuration of Alaska lands will have been largely finalized under the Alaska Native Claims Settlement Act of 1972. While this particular booklet…

  7. Scrambling the Nest Egg: How Well Do Teachers Understand Their Pensions, and What Do They Think about Alternative Pension Structures? Working Paper 51

    ERIC Educational Resources Information Center

    DeArmond, Michael; Goldhaber, Dan

    2010-01-01

    This paper addresses two questions: How well do teachers understand their current pension plans? And, what do they think about alternative plan structures? The data come from administrative records and a 2006 survey of teachers in Washington State. The results suggest Washington's teachers are fairly knowledgeable about their pensions, though new…

  8. Drug Adverse Event Detection in Health Plan Data Using the Gamma Poisson Shrinker and Comparison to the Tree-based Scan Statistic

    PubMed Central

    Brown, Jeffrey S.; Petronis, Kenneth R.; Bate, Andrew; Zhang, Fang; Dashevsky, Inna; Kulldorff, Martin; Avery, Taliser R.; Davis, Robert L.; Chan, K. Arnold; Andrade, Susan E.; Boudreau, Denise; Gunter, Margaret J.; Herrinton, Lisa; Pawloski, Pamala A.; Raebel, Marsha A.; Roblin, Douglas; Smith, David; Reynolds, Robert

    2013-01-01

    Background: Drug adverse event (AE) signal detection using the Gamma Poisson Shrinker (GPS) is commonly applied in spontaneous reporting. AE signal detection using large observational health plan databases can expand medication safety surveillance. Methods: Using data from nine health plans, we conducted a pilot study to evaluate the implementation and findings of the GPS approach for two antifungal drugs, terbinafine and itraconazole, and two diabetes drugs, pioglitazone and rosiglitazone. We evaluated 1676 diagnosis codes grouped into 183 different clinical concepts and four levels of granularity. Several signaling thresholds were assessed. GPS results were compared to findings from a companion study using the identical analytic dataset but an alternative statistical method—the tree-based scan statistic (TreeScan). Results: We identified 71 statistical signals across two signaling thresholds and two methods, including closely-related signals of overlapping diagnosis definitions. Initial review found that most signals represented known adverse drug reactions or confounding. About 31% of signals met the highest signaling threshold. Conclusions: The GPS method was successfully applied to observational health plan data in a distributed data environment as a drug safety data mining method. There was substantial concordance between the GPS and TreeScan approaches. Key method implementation decisions relate to defining exposures and outcomes and informed choice of signaling thresholds. PMID:24300404

  9. Pathologic Analysis of Control Plans for Air Pollution Management in Tehran Metropolis: A Cross-Sectional Study

    PubMed Central

    Salehi Shahrabi, Narges; Pourezzat, Aliasghar; Mobaraki, Hossein; Mafimoradi, Shiva

    2013-01-01

    Abstract Background The centralization of human activities is associated with different pollutants which enter into environment easily and cause the urban environment more vulnerable. Regarding the importance of air pollution issue for Tehran metropolis, many plans and regulations have been developed. However, most of them failed to decline the pollution. The purpose of this study was to pathologically analyze air-pollution control plans to offer effective solutions for Tehran metropolis. Methods A Qualitative content analysis in addition to a semi-structured interview with 14 practicing professional were used to identify 1) key sources of Tehran’s air pollution, 2) recognize challenges towards effective performance of pertinent plans and 3), offer effective solutions. Results Related challenges to air-pollution control plans can be divided into two major categories including lack of integrated and organized stewardship and PEST challenges. Conclusion For controlling the air pollution of Tehran effectively, various controlling alternatives were identified as systematization of plan preparation process, standardization and utilization of new technologies & experts, infrastructural development, realization of social justice, developing coordination mechanisms, improving citizens’ participatory capacity and focusing on effective management of fuel and energy. Controlling air pollution in Tehran needs a serious attention of policymakers to make enforcements through applying a systemic cycle of preparation comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders. PMID:26171340

  10. A Critical Review of Strategic Planning: Panacea for Public Education?

    ERIC Educational Resources Information Center

    Beach, Robert H.; Lindahl, Ron

    2004-01-01

    Many states, accrediting agencies, and the Interstate School Leaders Licensure Consortium have policies and standards mandating strategic planning for public schools. Planning in schools has become synonymous with strategic planning. However, alternative approaches to change exist that offer more effective solutions to school improvement. School…

  11. Ten years of health workforce planning in the Netherlands: a tentative evaluation of GP planning as an example

    PubMed Central

    2012-01-01

    Introduction In many countries, health-care labour markets are constantly being challenged by an alternation of shortage and oversupply. Avoiding these cyclic variations is a major challenge. In the Netherlands, a workforce planning model has been used in health care for ten years. Case description Since 1970, the Dutch government has explored different approaches to determine the inflow in medical schools. In 2000, a simulation model for health workforce planning was developed to estimate the required and available capacity of health professionals in the Netherlands. In this paper, this model is explained, using the Dutch general practitioners as an example. After the different steps in the model are clarified, it is shown how elements can be added to arrive at different versions of the model, or ‘scenarios’. A comparison is made of the results of different scenarios for different years. In addition, the subsequent stakeholder decision-making process is considered. Discussion and evaluation Discussion of this paper shows that workforce planning in the Netherlands is a complex modelling task, which is sensitive to different developments influencing the balance between supply and demand. It seems plausible that workforce planning has resulted in a balance between supply and demand of general practitioners. Still, it remains important that the modelling process is accepted by the different stakeholders. Besides calculating the balance between supply and demand, there needs to be an agreement between the stakeholders to implement the advised training inflow. The Dutch simulation model was evaluated using six criteria to be met by models suitable for policy objectives. This model meets these criteria, as it is a comprehensive and parsimonious model that can include all relevant factors. Conclusion Over the last decade, health workforce planning in the Netherlands has become an accepted instrument for calculating the required supply of health professionals on a regular basis. One of the strengths of the Dutch model is that it can be used for different types of medical and allied health professionals. A weakness is that the model is not yet fully capable of including substitutions between different medical professions to plan from a skill-mix perspective. Several improvements remain possible. PMID:22888974

  12. Radiobiological concepts for treatment planning of schemes that combines external beam radiotherapy and systemic targeted radiotherapy

    NASA Astrophysics Data System (ADS)

    Fabián Calderón Marín, Carlos; González González, Joaquín Jorge; Laguardia, Rodolfo Alfonso

    2017-09-01

    The combination of radiotherapy modalities with external bundles and systemic radiotherapy (CIERT) could be a reliable alternative for patients with multiple lesions or those where treatment planning maybe difficult because organ(s)-at-risk (OARs) constraints. Radiobiological models should have the capacity for predicting the biological irradiation response considering the differences in the temporal pattern of dose delivering in both modalities. Two CIERT scenarios were studied: sequential combination in which one modality is executed following the other one and concurrent combination when both modalities are running simultaneously. Expressions are provided for calculation of the dose-response magnitudes Tumor Control Probability (TCP) and Normal Tissue Complication Probability (NTCP). General results on radiobiological modeling using the linear-quadratic (LQ) model are also discussed. Inter-subject variation of radiosensitivity and volume irradiation effect in CIERT are studied. OARs should be under control during the planning in concurrent CIERT treatment as the administered activity is increased. The formulation presented here may be used for biological evaluation of prescriptions and biological treatment planning of CIERT schemes in clinical situation.

  13. Planning for Retirement with a Tax-Sheltered Mutual Fund.

    ERIC Educational Resources Information Center

    Schnee, Edward J.; And Others

    1983-01-01

    Greater attention has been focused on the role that employer-sponsored retirement plans and individual savings must play in ensuring retirement income security. Alternative tax retirement planning opportunities currently available to college personnel are explored. (MLW)

  14. An Inventory of Innovative Financing Plans to Help Pay for Higher Education.

    ERIC Educational Resources Information Center

    Merisotis, Jamie P.

    1989-01-01

    Creative ideas recently emerging to help families cope with rising educational costs are reviewed, including state and federal level savings plans, alternative loan programs, guaranteed access plans, and public service proposals. (Author/MSE)

  15. 48 CFR 906.202 - Establishing or maintaining alternative sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintaining alternative sources. 906.202 Section 906.202 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING COMPETITION REQUIREMENTS Full and Open Competition After Exclusion of Sources 906.202 Establishing or maintaining alternative sources. (b)(1) Every proposed contract...

  16. 48 CFR 406.202 - Establishing or maintaining alternative sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintaining alternative sources. 406.202 Section 406.202 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Full and Open Competition After Exclusion of Sources 406.202 Establishing or maintaining alternative sources. The Senior Procurement...

  17. 48 CFR 1406.202 - Establishing or maintaining alternative sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintaining alternative sources. 1406.202 Section 1406.202 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Full and Open Competition After Exclusion of Sources 1406.202 Establishing or maintaining alternative sources. HCAs are...

  18. 48 CFR 1306.202 - Establishing or maintaining alternative sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintaining alternative sources. 1306.202 Section 1306.202 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Full and Open Competition After Exclusion of Sources 1306.202 Establishing or maintaining alternative sources. The authority to...

  19. COMPLEAT (Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies): A planning tool for publicly owned electric utilities. [Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies (Compleat)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-09-01

    COMPLEAT takes its name, as an acronym, from Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies. It is an electric utility planning model designed for use principally by publicly owned electric utilities and agencies serving such utilities. As a model, COMPLEAT is significantly more full-featured and complex than called out in APPA's original plan and proposal to DOE. The additional complexity grew out of a series of discussions early in the development schedule, in which it became clear to APPA staff and advisors that the simplicity characterizing the original plan, while highly desirable in terms of utility applications, wasmore » not achievable if practical utility problems were to be addressed. The project teams settled on Energy 20/20, an existing model developed by Dr. George Backus of Policy Assessment Associates, as the best candidate for the kinds of modifications and extensions that would be required. The remainder of the project effort was devoted to designing specific input data files, output files, and user screens and to writing and testing the compute programs that would properly implement the desired features around Energy 20/20 as a core program. This report presents in outline form, the features and user interface of COMPLEAT.« less

  20. Impact of a Worksite Diabetes Prevention Intervention on Diet Quality and Social Cognitive Influences of Health Behavior: A Randomized Controlled Trial.

    PubMed

    Miller, Carla K; Weinhold, Kellie R; Nagaraja, Haikady N

    2016-03-01

    To evaluate the impact of a worksite diabetes prevention intervention on secondary outcomes regarding the change in diet quality and components of the Health Action Process Approach (HAPA) theoretical framework. Pretest-posttest control group design with 3-month follow-up. University worksite. Employees aged 18-65 years with prediabetes (n = 68). A 16-week group-based intervention adapted from the Diabetes Prevention Program. Diet quality was assessed using the Alternative Healthy Eating Index 2010; HAPA components were assessed via written questionnaire. Repeated-measures ANOVA compared the between- and within-group change in outcomes across time. Significant difference occurred between groups for the change in consumption of nuts/legumes and red/processed meats postintervention and for fruits at 3-month follow-up (all P < .05); a significant increase in total Alternative Healthy Eating Index 2010 score occurred postintervention in the experimental group (P = .002). The changes in action planning, action self-efficacy, and coping self-efficacy from HAPA were significantly different between groups after the intervention; the change in outcome expectancies was significantly different between groups at 3-month follow-up (all P < .05). The worksite intervention facilitated improvement in diet quality and in planning and efficacious beliefs regarding diabetes prevention. Further research is needed to evaluate the long-term impact of the intervention. Copyright © 2016 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

Top