Science.gov

Sample records for evaluation interim review

  1. 76 FR 58846 - Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety.... Nuclear Regulatory Commission (NRC) staff is issuing its Final Interim Staff Guidance (ISG)...

  2. Design review report FFTF interim storage cask

    SciTech Connect

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  3. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an...

  4. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  5. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  6. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  7. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  8. The EMEFS model evaluation. An interim report

    SciTech Connect

    Barchet, W.R.; Dennis, R.L.; Seilkop, S.K.; Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K.; Byun, D.; McHenry, J.N.; Karamchandani, P.; Venkatram, A.; Fung, C.; Misra, P.K.; Hansen, D.A.; Chang, J.S.

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  9. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  10. Concordance of interim and final estimates of influenza vaccine effectiveness: a systematic review.

    PubMed

    Leung, Vivian K; Cowling, Benjamin J; Feng, Shuo; Sullivan, Sheena G

    2016-04-21

    The World Health Organization's Global Influenza Surveillance and Response System meets twice a year to generate a recommendation for the composition of the seasonal influenza vaccine. Interim vaccine effectiveness (VE) estimates provide a preliminary indication of influenza vaccine performance during the season and may be useful for decision making. We reviewed 17 pairs of studies reporting 33 pairs of interim and final estimates using the test-negative design to evaluate whether interim estimates can reliably predict final estimates. We examined features of the study design that may be correlated with interim estimates being substantially different from their final estimates and identified differences related to change in study period and concomitant changes in sample size, proportion vaccinated and proportion of cases. An absolute difference of no more than 10% between interim and final estimates was found for 18 of 33 reported pairs of estimates, including six of 12 pairs reporting VE against any influenza, six of 10 for influenza A(H1N1)pdm09, four of seven for influenza A(H3N2) and two of four for influenza B. While we identified inconsistencies in the methods, the similarities between interim and final estimates support the utility of generating and disseminating preliminary estimates of VE while virus circulation is ongoing.

  11. Peer Review of the Waste Package Material Performance Interim Report

    SciTech Connect

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-09-04

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis.

  12. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  13. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  14. Toward a risk assessment of the spent fuel and high-level nuclear waste disposal system. Risk assessment requirements, literature review, methods evaluation: an interim report

    SciTech Connect

    Hamilton, L.D.; Hill, D.; Rowe, M.D.; Stern, E.

    1986-04-01

    This report provides background information for a risk assessment of the disposal system for spent nuclear fuel and high-level radioactive waste (HLW). It contains a literature review, a survey of the statutory requirements for risk assessment, and a preliminary evaluation of methods. The literature review outlines the state of knowledge of risk assessment and accident consequence analysis in the nuclear fuel cycle and its applicability to spent fuel and HLW disposal. The survey of statutory requirements determines the extent to which risk assessment may be needed in development of the waste-disposal system. The evaluation of methods reviews and evaluates merits and applicabilities of alternative methods for assessing risks and relates them to the problems of spent fuel and HLW disposal. 99 refs.

  15. Peer review of classroom teaching: an interim report.

    PubMed

    Costello, J; Pateman, B; Pusey, H; Longshaw, K

    2001-08-01

    This paper provides interim findings from the implementation of peer review of classroom teaching in a large UK University School of Nursing, Midwifery and Health Visiting. A total of 258 classroom teaching sessions, involving 129 teaching staff (n=129) were included over a period of 7 months. Teachers had two teaching sessions reviewed by a colleague. One reviewer was self-nominated and the Dean of School allocated the other. The paper is in two parts. Part one includes a short literature review followed by a descriptive account of how peer review was implemented. Part two focuses upon individual experiences from a small scale study with data obtained from 14 teachers (n=14) who took part in qualitative interviews based on their experiences of being both reviewer and reviewee. The larger study gathered data from several sources. This paper presents the initial findings from interview data with nurse teachers. Their perceptions form the basis of a discussion, which raises issues related to the experience of both implementing and being involved in, peer review of classroom teaching. Four themes emerged from the interview transcriptions; peer review was initially perceived as a threat; the experience of peer review was a positive one; teachers felt that being a reviewer was an interesting and worthwhile experience and perceived peer review positively when good relations existed between them and their reviewer.

  16. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  17. Reading First Implementation Evaluation: Interim Report

    ERIC Educational Resources Information Center

    Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer

    2006-01-01

    In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…

  18. Performance evaluation of the JPL interim digital SAR processor

    NASA Technical Reports Server (NTRS)

    Wu, C.; Barkan, B.; Curlander, J.; Jin, M.; Pang, S.

    1983-01-01

    The performance of the Interim Digital SAR Processor (IDP) was evaluated. The IDP processor was originally developed for experimental processing of digital SEASAT SAR data. One phase of the system upgrade which features parallel processing in three peripheral array processors, automated estimation for Doppler parameters, and unsupervised image pixel location determination and registration was executed. The method to compensate for the target range curvature effect was improved. A four point interpolation scheme is implemented to replace the nearest neighbor scheme used in the original IDP. The processor still maintains its fast throughput speed. The current performance and capability of the processing modes now available on the IDP system are updated.

  19. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20... that existing guidance does not sufficiently detail how the NRC staff reviews surveys of radon...

  20. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  1. 76 FR 72725 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... COMMISSION Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Revision of draft interim staff guidance; request.... Nuclear Regulatory Commission (NRC) requested public comments on Draft License Renewal Interim...

  2. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... COMMISSION License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing the final License Renewal Interim Staff Guidance...

  3. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    SciTech Connect

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  4. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  5. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  6. Evaluation and Research Center for Project Head Start, University of South Carolina. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Friedman, Myles I.

    This document is an interim evaluation report of language development curriculums in full year Head Start programs operating in the five state area the Research and Evaluation Center serves. One experimental study in language development carried on in cooperation with the Texas and Tulane centers is reported in depth. The study was implemented in…

  7. Interim radiological safety standards and evaluation procedures for subseabed high-level waste disposal

    SciTech Connect

    Klett, R.D.

    1997-06-01

    The Seabed Disposal Project (SDP) was evaluating the technical feasibility of high-level nuclear waste disposal in deep ocean sediments. Working standards were needed for risk assessments, evaluation of alternative designs, sensitivity studies, and conceptual design guidelines. This report completes a three part program to develop radiological standards for the feasibility phase of the SDP. The characteristics of subseabed disposal and how they affect the selection of standards are discussed. General radiological protection standards are reviewed, along with some new methods, and a systematic approach to developing standards is presented. The selected interim radiological standards for the SDP and the reasons for their selection are given. These standards have no legal or regulatory status and will be replaced or modified by regulatory agencies if subseabed disposal is implemented. 56 refs., 29 figs., 15 tabs.

  8. Home Start Evaluation Study. Interim Report III: Summative Evaluation Results.

    ERIC Educational Resources Information Center

    Deloria, Dennis; And Others

    This report presents data collected in six of the 16 Home Start sites in operation in the spring of 1973. The major task of the pilot summative evaluation was to try out the measurement battery so necessary modifications could be completed before beginning the actual evaluation in fall 1973. Another purpose was to train a capable field staff and…

  9. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Federal Aviation Administration Interim Policy, FAA Review of Solar Energy System Projects on Federally... federally obligated airports to construct solar energy systems on airport property. FAA is adopting an... for measuring ocular impact of proposed solar energy systems which are effective upon publication....

  10. Barrier Free Access to the Man-Made Environment - A Review of Current Literature. Interim Report.

    ERIC Educational Resources Information Center

    Steinfeld, Edward

    Reviewed in the interim report on revision of the existing American National Standards Institute provision is current literature on barrier free design for disabled individuals. The report addresses the following topics: the history of access as a civil right; demographic aspects (including information on task dysfunctions of disabled persons…

  11. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...The NRC staff is soliciting public comment on its proposed Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for......

  12. Peer Review of Classroom Teaching: An Interim Report.

    ERIC Educational Resources Information Center

    Costello, John; Pateman, Brian; Pusey, Helen; Longshaw, Keith

    2001-01-01

    Data from peer reviews of 258 teaching sessions involving 129 nursing teachers and interviews with 14 teachers identified several themes. Initially perceived as a threat, peer review became a positive experience for both reviewer and reviewed. Preparation of reviewers and a process for changing nominated reviewers were recommended. (SK)

  13. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    SciTech Connect

    Cohon, Jared L.; Glauthier, T. J.; Augustine, Norman R.; Austin, Wanda M.; Elachi, Charles; Fleury, Paul A.; Hockfield, Susan J.; Meserve, Richard A.; Murray, Cherry A.

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  14. An Evaluation of the Influence of Interim Assessments on Grade 8 Student Achievement in Mathematics and Language Arts

    ERIC Educational Resources Information Center

    Pereira, Maria; Tienken, Christopher

    2012-01-01

    A review of the literature pertaining to the effect and influence that interim assessments have on student achievement lacks quantitative data to determine the efficiency of their use in the classroom as a school reform tool. This study examined the strength and the direction of the relationships between interim pre and posttest assessments in…

  15. Prognostic value of interim FDG-PET in Hodgkin lymphoma: systematic review and meta-analysis.

    PubMed

    Adams, Hugo J A; Nievelstein, Rutger A J; Kwee, Thomas C

    2015-08-01

    This study aimed to systematically review and meta-analyse the value of interim (18) F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in predicting treatment failure in Hodgkin lymphoma. MEDLINE was systematically searched for original studies that used standardized international criteria for interim FDG-PET interpretation. Included studies were methodologically assessed. Summary receiver operating characteristic (sROC) analysis was performed, and pooled sensitivity and specificity were calculated using a random effects model. Heterogeneity in diagnostic odds ratios (DORs) across studies was assessed and potential sources for inter-study heterogeneity were explored using subgroup analyses. Ten studies, comprising a total of 1389 Hodgkin lymphoma patients, were included. Sensitivity, specificity, positive predictive value and negative predictive value of interim FDG-PET for predicting treatment failure ranged between 0.0-81.5%, 72.2-96.6%, 0.0-86.0% and 84.4-98.6%, respectively. The area under the sROC curve was 0.877. Pooled sensitivity and specificity were 70.8% [95% confidence interval (CI): 64.7-76.4%] and 89.9% (95% CI: 88.0-91.6%). There was heterogeneity in DORs across individual studies (I2 = 72.7). The overall prognostic value of interim FDG-PET appears to be moderate for excluding and relatively high for identifying treatment failure in Hodgkin lymphoma. However, interim FDG-PET cannot yet be implemented in routine clinical practice due to moderate-quality evidence and inter-study heterogeneity that cannot be fully explained yet.

  16. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…

  17. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    ERIC Educational Resources Information Center

    D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin

    In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…

  18. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation. [Executive Summary

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…

  19. National Home Start Evaluation Interim Report VI. Executive Summary: Findings and Recommendations.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is an executive summary of the interim report on National Home Start Evaluation. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her own children and to provide comprehensive social-emotional,…

  20. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  1. REVIEW OF FAST FLUX TEST FACILITY (FFTF) FUEL EXPERIMENTS FOR STORAGE IN INTERIM STORAGE CASKS (ISC)

    SciTech Connect

    CHASTAIN, S.A.

    2005-10-24

    Appendix H, Section H.3.3.10.11 of the Final Safety Analysis Report (FSAR), provides the limits to be observed for fueled components authorized for storage in the Fast Flux Test Facility (FFTF) spent fuel storage system. Currently, the authorization basis allows standard driver fuel assemblies (DFA), as described in the FSAR Chapter 17, Section 17.5.3.1, to be stored provided decay power per assembly is {le} 250 watts, post-irradiation time is four years minimum, average assembly burn-up is 150,000 MWD/MTHM maximum and the pre-irradiation enrichment is 29.3% maximum (per H.3.3.10.11). In addition, driver evaluation (DE), core characterizer assemblies (CCA), and run-to-cladding-breach (RTCB) assemblies are included based on their similarities to a standard DFA. Ident-69 pin containers with fuel pins from these DFAs can also be stored. Section H.3.3.10.11 states that fuel types outside the specification criteria above will be addressed on a case-by-case basis. There are many different types of fuel and blanket experiments that were irradiated in the FFTF which now require offload to the spent fuel storage system. Two reviews were completed for a portion of these special type fuel components to determine if placement into the Core Component Container (CCC)/Interim Storage Cask (ISC) would require any special considerations or changes to the authorization basis. Project mission priorities coupled with availability of resources and analysts prevented these evaluations from being completed as a single effort. Areas of review have included radiological accident release consequences, radiological shielding adequacy, criticality safety, thermal limits, confinement, and stress. The results of these reviews are available in WHC-SD-FF-RPT-005, Rev. 0 and 1, ''Review of FFTF Fuel Experiments for Storage at ISA'', (Reference I), which subsequently allowed a large portion of these components to be included in the authorization basis (Table H.3.3-21). The report also identified

  2. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ...The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to......

  3. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    SciTech Connect

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  4. 77 FR 65728 - Final Interim Staff Guidance Augmenting NUREG-1537, “Guidelines for Preparing and Reviewing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... COMMISSION Final Interim Staff Guidance Augmenting NUREG-1537, ``Guidelines for Preparing and Reviewing... Staff Guidance (ISG), that augments NUREG- 1537, Part 1, ``Guidelines for Preparing and Reviewing... NRC published for public comment Chapters 1-6 of the draft ISG, that augments NUREG-1537, Part...

  5. Weatherization Works: An interim report of the National Weatherization Evaluation

    SciTech Connect

    Brown, M.A.; Berry, L.G.; Kinney, L.F.

    1993-11-01

    The National Weatherization Evaluation is the first comprehensive evaluation of the Weatherization Assistance Program since 1984. The evaluation was designed to accomplish the following goals: Estimate energy savings and cost effectiveness; Assess nonenergy impacts; Describe the weatherization network; Characterize the eligible population and resources; and Identify factors influencing outcomes and opportunities for the future. As a national program, weatherization incorporates considerable diversity due to regional differences. Therefore, evaluation results are presented both in aggregate and for three climate regions: cold, moderate and hot.

  6. Interim report on nodel evaluation methodology and the evaluation of LEAP

    SciTech Connect

    Alsmiller, R.G. Jr.; Barish, J.; Bjornstad, D.

    1980-04-01

    This report describes progress made at ORNL toward development and demonstration of a methodology for evaluating energy-economic modeling codes and important results derived from these codes. To bolster traditional evaluation methods with more-quantitative procedures of interest to the Energy Information Administration, ORNL is applying sensitivity theory as part of a comprehensive effort to quantify the importance of various data and model parameters to the key results that are of interest. The Long-Term Energy Analysis Program (LEAP) was chosen as the initial focus for the research. LEAP is an energy-economy model which resides in the Long-Term Energy Analysis Division (LTEAD) of the Integrative Analysis Group in the Office of Applied Analysis, EIA. LTEAD developed Model 22C of LEAP for two reasons: (1) to prepare projections through the year 2020, which were needed for the 1978 EIA Annual Report to Congress and (2) to develop a base for analyses of specific options for Federal action. LEAP Model 22C and its uses are described to provide the background for this interim description of the model evaluation effort at ORNL. 19 figures, 10 tables.

  7. Evaluation of In Harmony: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Lord, Pippa; Sharp, Caroline; Dawson, Anneka; Mehta, Palak; White, Richard; Jeffes, Jennifer

    2013-01-01

    Arts Council England (ACE) commissioned NFER to undertake the national evaluation of the In Harmony social and music education programme 2012-2015. In Harmony is funded by the Department for Education (DfE) and ACE, and is currently being piloted in six areas. The evaluation is investigating the range and extent of impacts on children, families,…

  8. Interim Principals.

    ERIC Educational Resources Information Center

    Beem, Kate

    2003-01-01

    An interim principal can buy a school district time to land a permanent successor. Also lists where to find an interim principal; the interim's steadying influence; Bob Wallace's wild ride as an interim principal in post-retirement; and Roger Prosise's rationale for turning to an interim appointment. (MLF)

  9. Interim Guidelines for the Evaluation and Testing of Infants with Possible Congenital Zika Virus Infection - United States, 2016.

    PubMed

    Staples, J Erin; Dziuban, Eric J; Fischer, Marc; Cragan, Janet D; Rasmussen, Sonja A; Cannon, Michael J; Frey, Meghan T; Renquist, Christina M; Lanciotti, Robert S; Muñoz, Jorge L; Powers, Ann M; Honein, Margaret A; Moore, Cynthia A

    2016-01-29

    CDC has developed interim guidelines for health care providers in the United States who are caring for infants born to mothers who traveled to or resided in an area with Zika virus transmission during pregnancy. These guidelines include recommendations for the testing and management of these infants. Guidance is subject to change as more information becomes available; the latest information, including answers to commonly asked questions, can be found online (http://www.cdc.gov/zika). Pediatric health care providers should work closely with obstetric providers to identify infants whose mothers were potentially infected with Zika virus during pregnancy (based on travel to or residence in an area with Zika virus transmission [http://wwwnc.cdc.gov/travel/notices]), and review fetal ultrasounds and maternal testing for Zika virus infection (see Interim Guidelines for Pregnant Women During a Zika Virus Outbreak*) (1). Zika virus testing is recommended for 1) infants with microcephaly or intracranial calcifications born to women who traveled to or resided in an area with Zika virus transmission while pregnant; or 2) infants born to mothers with positive or inconclusive test results for Zika virus infection. For infants with laboratory evidence of a possible congenital Zika virus infection, additional clinical evaluation and follow-up is recommended. Health care providers should contact their state or territorial health department to facilitate testing. As an arboviral disease, Zika virus disease is a nationally notifiable condition.

  10. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  11. STARPAHC Interim Evaluation Report, May 1975 - April 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The primary goals of the STARPAHC Program are to provide data for developing health care for future manned spacecraft, and to establish the feasibility of the STARPAHC concept for improving the delivery of health care to remote areas on earth. Accordingly, the hardware and medical evaluations initiated during the first 6 months of system operation were continued and expanded during the second 6-month period. The evaluations are based on what has proven to be a relatively stabilized 6-month period wherein system failures which occurred during the initial shakedown period in the first 6 months have been minimized. Early trends and performance data reported in the first semi-annual report were reexamined to either verify, modify or change earlier conclusions. The highlights are given of the total year of operation with emphasis on comparisons between the first and second semi-annual reporting period. In addition, an early analysis of costs is summarized.

  12. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  13. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  14. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  15. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  16. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  17. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2001-03-23

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  18. Comprehensive computerized medical imaging: interim hypothetical economic evaluation

    NASA Astrophysics Data System (ADS)

    Warburton, Rebecca N.; Fisher, Paul D.; Nosil, Josip

    1990-08-01

    The 422-bed Victoria General Hospital (VGH) and Siemens Electric Limited have since 1983 been piloting the implementation of comprehensive computerized medical imaging, including digital acquisition of diagnostic images, in British Columbia. Although full PACS is not yet in place at VGH, experience to date habeen used to project annual cost figures (including capital replacement) for a fully-computerized department. The resulting economic evaluation has been labelled hypothetical to emphasize that some key cost components were estimated rather than observed; this paper presents updated cost figures based on recent revisions to proposed departmental equipment configuration which raised the cost of conventional imaging equipment by 0.3 million* and lowered the cost of computerized imaging equipment by 0.8 million. Compared with conventional diagnostic imaging, computerized imaging appears to raise overall annual costs at VGH by nearly 0.7 million, or 11.6%; this is more favourable than the previous results, which indicated extra annual costs of 1 million (16.9%). Sensitivity analysis still indicates that all reasonable changes in the underlying assumptions result in higher costs for computerized imaging than for conventional imaging. Computerized imaging offers lower radiation exposure to patients, shorter waiting times, and other potential advantages, but as yet the price of obtaining these benefits remains substantial.

  19. Cost Sensitivity Analysis for Consolidated Interim Storage of Spent Fuel: Evaluating the Effect of Economic Environment Parameters

    SciTech Connect

    Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.; Joseph, III, Robert Anthony

    2016-12-01

    This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.

  20. Prognostic value of interim and end-of-treatment FDG-PET in follicular lymphoma: a systematic review.

    PubMed

    Adams, Hugo J A; Nievelstein, Rutger A J; Kwee, Thomas C

    2016-01-01

    This study aimed to systematically review the prognostic value of interim and end-of-treatment (18)F-fluoro-2-deoxy-D-glucose positron emission tomography (FDG-PET) in follicular lymphoma during and after first-line therapy. The PubMed/MEDLINE database was searched for relevant original studies. Included studies were methodologically assessed, and their results were extracted and descriptively analyzed. Three studies on the prognostic value of interim FDG-PET and eight studies on the prognostic value of end-of-treatment FDG-PET were included. Overall, studies were of poor methodological quality. In addition, there was incomplete reporting of progression-free survival (PFS) and overall survival (OS) data by several studies, and none of the studies incorporated the Follicular Lymphoma International Prognostic Index (FLIPI) in the OS analyses. Two studies reported no significant difference in PFS between interim FDG-PET positive and negative patients, whereas one study reported a significant difference in PFS between the two groups. Two studies reported no significant difference in OS between interim FDG-PET positive and negative patients. Five studies reported end-of-treatment FDG-PET positive patients to have a significantly worse PFS than end-of-treatment FDG-PET negative patients, and one study reported a non-significant trend towards a worse PFS for end-of-treatment FDG-PET positive patients. Three studies reported end-of-treatment FDG-PET positive patients to have a significantly worse OS than end-of-treatment FDG-PET negative patients. In conclusion, the available evidence does not support the use of interim FDG-PET in follicular lymphoma. Although published studies suggest end-of-treatment FDG-PET to be predictive of PFS and OS, they suffer from numerous biases and failure to correct OS prediction for the FLIPI.

  1. Analysis of the Cordex evaluation runs (ERA_Interim) over Southern Africa

    NASA Astrophysics Data System (ADS)

    Lennard, Chris; Kalognoumou, Liana

    2013-04-01

    The CORDEX program was instituted by the World Climate Research Program (WCRP) to develop downscaled regional climate change projections at user-relevant scales for all terrestrial regions of the world. Africa was identified as the priority domain in urgent need of attention. In light of this the Cordex-Africa Analysis campaign was initiated as a co-ordinated effort to analyse the available Era-Interim downscalings. Three regional African groups were formed (West Africa, East Africa and Southern Africa) and experts from each region tasked with the assessment of the available downscaled data. Within Africa, CORDEX has come to be viewed by many in the decision making community as the leading source of new climate change information, and expectations are high. This paper presents the analysis performed by the southern African team in which the ability of ten regional climate models (RCMs) to simulate precipitation over southern Africa within the Cordex framework was evaluated. An ensemble of ten regional climate simulations and the ensemble average is analysed to evaluate the model's ability to reproduce seasonal and interannual rainfall characteristics over regions of the sub-continent. All the RCMs use the Cordex African domain, have a spatial resolution of ~50km and are driven by the ERA-Interim reanalysis (1989- 2008). Results are compared against a number of observational datasets such as the GPCC, CRU, UDEL, TRMM etc. The spatial and temporal nature of rainfall over the Southern African region is captured by all RCMs, however, individual models exhibit wet or dry biases over particular regions of the domain. Models generally produce lower seasonal variability of precipitation compared to observations and the magnitude of the variability varies in space and time. Model biases are related to the positioning of the ITCZ as well as moisture transport. The multi-model ensemble mean generally out-performs individual models, with bias magnitudes similar to differences

  2. Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report

    SciTech Connect

    Ayers, C.W.

    2004-11-23

    Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  3. Evaluation of flexural strength of resin interim restorations impregnated with various types of silane treated and untreated glass fibres

    PubMed Central

    Naveen, K.S.; Singh, J.P.; Viswambaran, M.; Dhiman, R.K.

    2015-01-01

    Background Flexural strength is an important mechanical property that determines the long-term prognosis of interim restorations. Studies are lacking regarding the effect of silanation of the various types of glass fibre impregnation on the flexural strength of resin interim restorations. Methods A customized metal die was milled to simulate the prepared abutments of a three-unit fixed dental prosthesis. A total of seventy five samples of interim fixed dental prostheses were prepared using autopolymerizing tooth colour acrylic resin. Unidirectional and woven forms of glass fibres (Stick and Stick Net), which were silane treated and untreated were used to reinforce the resin matrix. Fifteen samples were prepared for each group along with unreinforced group serving as control. The flexural strength was evaluated with universal testing machine. Results The means and standard deviations of flexural strength for different groups were 13.90 ± 2.96 (control), 61.58 ± 5.26 (unidirectional fibres), 30.89 ± 3.60 (woven fibres), 112.05 ± 5.51 (silane treated unidirectional fibres) and 73.85 ± 4.10 (silane treated woven fibres) respectively. The mean flexural strength of silane treated unidirectional fibres (112.05 MPa) was highest and statistically highly significant (P < 0.0001) compared to all other groups. Conclusions Within the limitations of the current study, flexural strength of the reinforced PMMA interim fixed dental prosthesis was significantly higher (P < 0.0001) when compared to the unreinforced PMMA interim fixed dental prosthesis. The use of silane treated unidirectional glass fibres is an effective method of reinforcing interim fixed restorations made of PMMA resins. PMID:26843742

  4. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... COMMISSION Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors Reviews AGENCY: Nuclear Regulatory Commission. ACTION: Draft Interim Staff Guidance; request for comment... comment on, draft Interim Staff Guidance (ISG) ESP/COL-ISG-027, ``Interim Staff Guidance...

  5. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  6. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    SciTech Connect

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  7. Panton-Valentine Leukocidin associated with community acquired methicillin resistant Staphylococcus aureus: a case report and review of interim guidelines.

    PubMed

    Baldwin, L N; Lowe, A D

    2008-07-01

    We report a case of community acquired methicillin resistant Staphylococcus aureus pneumonia. The causative organism was positive for the toxin Panton-Valentine Leukocidin. This resulted in a severe pneumonia requiring a prolonged stay on our intensive care unit. This infection is becoming more common in the United Kingdom. It can cause a far more aggressive illness than the hospital acquired infection with a high mortality if it becomes an invasive infection. The Department of Health has recently produced interim guidelines for its treatment which we have also reviewed.

  8. Interim treatment: Bridging delays to opioid treatment access

    PubMed Central

    Sigmon, Stacey C.

    2015-01-01

    Objective Despite the undisputed effectiveness of agonist maintenance for opioid dependence, individuals can remain on waitlists for months, during which they are at significant risk for morbidity and mortality. To mitigate these risks, the Food and Drug Administration in 1993 approved interim treatment, involving daily medication + emergency counseling only, when only a waitlist is otherwise available. We review the published research in the 20 years since the approval of interim opioid treatment. Methods A literature search was conducted to identify all randomized trials evaluating the efficacy of interim treatment for opioid-dependent patients awaiting comprehensive treatment. Results Interim opioid treatment has been evaluated in four controlled trials to date. In three, interim treatment was compared to waitlist or placebo control conditions and produced greater outcomes on measures of illicit opioid use, retention, criminality and likelihood of entry into comprehensive treatment. In the fourth, interim treatment was compared to standard methadone maintenance and produced comparable outcomes in illicit opioid use, retention and criminal activity. Conclusions Interim treatment significantly reduces patient and societal risks when conventional treatment is unavailable. Further research is needed to examine the generality of these findings, further enhance outcomes, and identify the patient characteristics which predict treatment response. PMID:25937593

  9. Evaluation of 2004 Toyota Prius Hybrid Electic Drive System Interim Report - Revised

    SciTech Connect

    Ayers, C.W.; Hsu, J.S.; Marlino, L.D.; Miller, C.W.; Ott, G.W., Jr.; Oland, C.B.; Burress, T.A.

    2007-07-31

    The 2004 Toyota Prius is a hybrid automobile equipped with a gasoline engine and a battery-powered electric motor. Both of these motive power sources are capable of providing mechanical drive power for the vehicle. The engine can deliver a peak power output of 57 kilowatts (kW) at 5000 revolutions per minute (rpm) while the motor can deliver a peak power output of 50 kW at 1300 rpm. Together, this engine-motor combination has a specified peak power output of 82 kW at a vehicle speed of 85 kilometers per hour (km/h). In operation, the 2004 Prius exhibits superior fuel economy compared to conventionally powered automobiles. Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

  10. Safety evaluation for the interim stabilization of Tank 241-C-103

    SciTech Connect

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  11. Prognostic value of interim FDG-PET in R-CHOP-treated diffuse large B-cell lymphoma: Systematic review and meta-analysis.

    PubMed

    Adams, Hugo J A; Kwee, Thomas C

    2016-10-01

    This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL.

  12. Interim obturator in an infant with Treacher Collins syndrome: Review and chairside modification in impression making

    PubMed Central

    Bhandari, Sudhir; Aras, Meena; Bakshi, Sonika

    2011-01-01

    Treacher Collins syndrome has been described as a syndrome involving 1st and 2nd branchial arches, affecting various organs in the craniofacial region. Affected infants report with nasal regurgitation and minimal dietary intake due to cleft palate, consequently show delayed and retarded growth. The situation is further complicated when the repair of the palatal defect is postponed due to delayed milestones. At this juncture, it is of paramount importance to intervene prosthetically and close the defect with the aid of an interim obturator. Herein we describe a simple, yet successful, chairside approach to make an impression of an infant without the aid of any kind of anesthesia. PMID:22346164

  13. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102... REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or... administrative judge granting interim relief under 5 U.S.C. 7701(b)(2)(A) and a petition for review of...

  14. Evaluation of higher distribution and/or utilization voltages. Fourth interim report (August 1980): assessment of optimum distribution configuration

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the fourth task, Assessment of Optimum Distribution Configuration, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of a computer model for assessment of life cycle costs for the distribution and utilization systems, the development of an optimization algorithm to enable distribution system configuration optimization and a net energy analysis to determine potential net energy savings. Input data for this task derive from Task 3. The major output of this task is a documented computer code.

  15. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  16. Evaluation of the Flexural Strength of Interim Restorative Materials in Fixed Prosthodontics

    PubMed Central

    Mehrpour, Hanieh; Farjood, Ehsan; Giti, Rashin; Barfi Ghasrdashti, Alireza; Heidari, Hossein

    2016-01-01

    Statement of the Problem Mechanical properties of interim restorations are considered as important factors specially when selecting materials for long-term application or for patients with para-functional habits. Flexural strength is one of the most important components of these restorations. Purpose The purpose of this study was to compare the flexural strength of five interim restorative materials. Materials and Method Fifty identical samples sized 25×2×2-mm were made from five interim materials (TempSpan; Protemp 4, Unifast III, Trim, and Revotek LC) according to ADA specification #27. The specimens were stored in artificial saliva for 2 weeks and then thermocycled for 2500 cycles (5-55˚C). A standard three-point bending test was conducted on the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Data were analyzed by using one-way ANOVA and Tamhane’s post-hoc tests to measure the flexural strength of temporary materials. Results One of the bis-acryl resins (TempSpan) showed the highest, and the light polymerized resin (Revotek LC) showed the lowest flexural strength. The mean values of flexural strength (MPa) for the examined materials were as follow: TempSpan=120.00, Protemp 4=113.00, Unifast III=64.20, Trim= 63.73 and Revotek LC=47.16. There were significant differences between all materials except Trim and Unifast III which did not show any statistical significant difference. Conclusion Bis-acryl resins were statistically superior to traditional methacrylate and light-cured resins. Therefore, application of bis-acryl resins should be deliberated in patients with heavy occlusion and in cases that need long-term use of interim restorations. PMID:27602395

  17. Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans

    NASA Technical Reports Server (NTRS)

    Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.

    2014-01-01

    The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.

  18. Secondary use of structured patient data: interim results of a systematic review.

    PubMed

    Vuokko, Riikka; Mäkelä-Bengs, Päivi; Hyppönen, Hannele; Doupi, Persephone

    2015-01-01

    In addition to patient care, EHR data are increasingly in demand for secondary purposes, e.g. administration, research and enterprise resource planning. We conducted a systematic literature review and subsequent analysis of 85 articles focusing on the secondary use of structured patient records. We grounded the analysis on how patient records have been structured, how these structures have been evaluated and what are the main results achieved from the secondary use viewpoint. We conclude that secondary use requires complete and interoperable patient records, which in turn depend on better alignment of primary and secondary users' needs and benefits.

  19. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  20. Evaluation of ceramics for stator applications: Gas turbine engines interim report. Stator fabrication and evaluation

    NASA Technical Reports Server (NTRS)

    Arnon, N.; Trela, W.

    1983-01-01

    The objective was to assess current ceramic materials, fabrication processes, reliability prediction, and stator durability when subjected to simulated automotive gas turbine engine operating conditions. Ceramic one-piece stators were fabricated of two materials, silicon nitride and silicon carbide, using two near-net-shape processes, slip casting and injection molding. Non-destructive evaluation tests were conducted on all stators identifying irregularities which could contribute to failures under durability testing. Development of the test rig and automatic control system for repeatably controlling air flow rate and temperature over a highly transient durability duty cycle is discussed. Durability results are presented for repeated thermal cycle testing of the ceramic one-piece stators. Two duty cycles were used, encompassing the temperature ranges of 704 to 1204 C (1300 to 2200 F) and 871 to 1371 C (1600 to 2500 F). Tests were conducted on 28 stators, accumulating 135,551 cycles in 2441 hours of hot testing. Cyclic durability for the ceramic one-piece stator was demonstrated to be in excess of 500 hours, accumulating over 28,850 thermal cycles. Ceramic interface forces were found to be the significant factor in limiting stator life rather than the scatter in material strength properties or the variation in component defects encountered.

  1. Southern Hemisphere Cloudiness In Extratropical Cyclones: An Observational Evaluation Of ERA-interim And MERRA

    NASA Astrophysics Data System (ADS)

    Naud, C. M.; Booth, J. F.; Del Genio, A. D.; Posselt, D. J.; van den Heever, S. C.

    2013-12-01

    Recently, underestimates in modeled southern oceans cloud cover were reported for most major general circulation models. However, it is unclear if reanalyses that assimilate multiple observations, and as such are deemed more reliable, also have this issue. Using MODIS, MISR and CloudSat-CALIPSO cloud cover datasets as a reference, we show that the same problem is found in both the ERA-interim and the MERRA reanalysis. We find that both reanalyses underestimate cloud cover by 5% to 20% in the 30S to 60S latitude band. Since extratropical cyclones are ubiquitous in this region, we determined whether clouds in these systems were also underestimated in both reanalyses. The MAP climatology of midlatitude storminess database is used to locate extratropical cyclones, and MODIS, MISR and CloudSat-CALIPSO provide the coincident and collocated cloud cover. An intercomparison between MODIS, MISR and CloudSat-CALIPSO cyclone-centered composites of cloud fractions was performed to provide a measure of the observational uncertainty. Uncertainty in the datasets was found to be less than the cloud cover bias in the reanalyses. It was evident that both ERA-interim and MERRA underestimate cloud cover in extratropical cyclones. Additionally, the underestimation was regime dependent, with a minimum bias in the cyclone warm sector north east of the low-pressure center and a maximum bias to the west of the low-pressure center and west of the cold front. MODIS and MISR cloud properties indicate that this maximum bias in cloud cover occurs in an area populated by low-level clouds often of broken nature. Comparison between reanalyses and CloudSat-CALIPSO vertical profiles reveal that this lack of low level clouds is also present to the east of the low-pressure centers in the warm frontal region. The cloud cover low bias is more pronounced in the MERRA reanalysis than ERA-interim, but differences between the two reanalyses in the dynamical and thermodynamical properties of the cyclones

  2. 75 FR 52597 - Availability of Interim Procedures for Federal External Review and Model Notices Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Federal External Review and Model Notices Relating to Internal Claims and Appeals and External Review Under the Patient Protection and Affordable Care Act; Notice AGENCY: Internal Revenue Service... external review process and model notices both for internal claims and appeals and for external...

  3. Evaluation of the interim measurement protocol for railway noise source description

    NASA Astrophysics Data System (ADS)

    Janssens, M. H. A.; Jansen, H. W.; Dittrich, M. G.

    2006-06-01

    The Dutch national calculation scheme for railway noise has been declared the default interim method for railway noise calculation by the EU, until the introduction of results from the Harmonoise project. It includes a measurement protocol for determining emission input data in the format suitable for the present calculation scheme. The calculation scheme contains a fixed database of emission data for common Dutch rolling stock. The measurement protocol provides for the addition of emission data of new or foreign rolling stock. This is relevant for the Netherlands, as such rolling stock increasingly appears on the network, but also for other European countries that are going to use the interim method, since emission data for their rolling stock have to be established. The protocol features two procedures. Procedure A allows using the existing fixed database of emission data. Selection of a particular dataset (or 'category') can be based on external appearance of rolling stock (without measurements) or pass-by sound pressure level measurements at a site with known rail roughness. If a user finds that none of the existing data sets properly represent its rolling stock, the optional procedure B is available. This procedure assesses pass-by levels, track and wheel roughness levels. The measurement protocol is based on a type-test-like procedure requiring controlled conditions for the vehicle and track. A measurement campaign has been undertaken to test procedures A and B. This campaign coincided with a Swiss campaign to establish the sound emission of freight vehicles equipped with composite block brakes. The test of the protocol was focussed both on the practicability of the required measurements and on the unambiguity and comprehensiveness of the test. Open questions, findings, resulting conclusions and recommendations regarding the protocol are discussed here.

  4. Downwelling longwave flux over Summit, Greenland, 2010-2012: Analysis of surface-based observations and evaluation of ERA-Interim using wavelets

    NASA Astrophysics Data System (ADS)

    Cox, Christopher J.; Walden, Von P.; Compo, Gilbert P.; Rowe, Penny M.; Shupe, Matthew D.; Steffen, Konrad

    2014-11-01

    This study analyzes the downwelling longwave radiation (DLW) over the Greenland Ice Sheet (GrIS) using surface-based observations from Summit Station (72°N, 38°W; 3210 m) and the European Centre for Medium-Range Weather Forecasts Interim Reanalysis (ERA-Interim) DLW fields. Since surface-based observations are sparse in the Arctic, the accuracy of including reanalyses for spatial context is assessed. First, the DLW at Summit is reported, including the significant time scales of variability using time-frequency decomposition (wavelet analysis). A new method for evaluating reanalyses is then introduced that also uses wavelet analysis. ERA-Interim DLW performs reasonably well at Summit, but because it includes too many thin clouds and too few thick clouds, it is biased low overall. The correlation between the observations and ERA-Interim drops from r2 > 0.8 to near 0 for time series reconstructed from time scales less than ~4 days. These low correlations and additional analyses suggest that the spatial resolution of the data sets is a factor in representing variability on short time scales. The bias is low across all time scales and is thus likely tied to cloud generation processes in the model rather than the spatial representation of the atmosphere across the GrIS. The exception is autumn, when ERA-Interim overestimates the influence of clouds at time scales of 1 and 4 weeks. The spatial distribution of cloud influence on the DLW across the GrIS indicates that Summit is located in a transition zone with respect to cloud properties. The gradient across this transition zone is steepest near Summit in autumn, so the spatial characteristics of the atmosphere near Summit may contribute to the ERA-Interim bias during this time.

  5. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... request from the Nuclear Energy Institute (NEI), the NRC is extending the public comment period until... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY... Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; extension of...

  6. Evaluation of groundwater flow and transport at the Shoal underground nuclear test: An interim report

    SciTech Connect

    Pohll, G.; Chapman, J.; Hassan, A.; Papelis, C.; Andricevic, R.; Shirley, C.

    1998-07-01

    Since 1962, all United States nuclear tests have been conducted underground. A consequence of this testing has been the deposition of large amounts of radioactive materials in the subsurface, sometimes in direct contact with groundwater. The majority of this testing occurred on the Nevada Test Site, but a limited number of experiments were conducted in other locations. One of these is the subject of this report, the Project Shoal Area (PSA), located about 50 km southeast of Fallon, Nevada. The Shoal test consisted of a 12-kiloton-yield nuclear detonation which occurred on October 26, 1963. Project Shoal was part of studies to enhance seismic detection of underground nuclear tests, in particular, in active earthquake areas. Characterization of groundwater contamination at the Project Shoal Area is being conducted by the US Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) with the State of Nevada Department of Environmental Protection and the US Department of Defense (DOD). This order prescribes a Corrective Action Strategy (Appendix VI), which, as applied to underground nuclear tests, involves preparing a Corrective Action Investigation Plan (CAIP), Corrective Action Decision Document (CADD), Corrective Action Plan, and Closure Report. The scope of the CAIP is flow and transport modeling to establish contaminant boundaries that are protective of human health and the environment. This interim report describes the current status of the flow and transport modeling for the PSA.

  7. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    SciTech Connect

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.

  8. WWC Review of the Report "Philadelphia's Renaissance Schools Initiative: 18 Month Interim Report"

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2012

    2012-01-01

    The study reviewed in this report examined the effects of Philadelphia's "Renaissance Schools Initiative" on students in K-8 schools after one year of implementation. Schools were selected for participation based on their School Performance Index (SPI) at the start of the 2010-11 school year. The SPI rates every school in Philadelphia…

  9. Primer for the Interim Chair

    ERIC Educational Resources Information Center

    Soltys, Stephen M.

    2011-01-01

    Objective: Being successful in the role of an Interim Chair requires an approach to transitional leadership that is different from that of individuals filling the Chair role permanently. This article reviews pertinent literature on the topic. Method: The author reviewed the literature, cited pertinent articles, and supplemented with personal…

  10. WWC Review of the Report "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading." What Works Clearinghouse Single Study Review

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2015

    2015-01-01

    The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…

  11. Evaluation of Shear Strength Threshold of Concern for Retrieval of Interim-Stored K-Basin Sludge in the Hanford Site

    SciTech Connect

    Onishi, Yasuo; Yokuda, Satoru T.; Schmidt, Andrew J.

    2010-11-01

    K-Basin sludge will be recovered into the Sludge Transport and Storage Containers (STSCs) and will be stored in the T Plant for interim storage (at least 10 years). Long-term sludge storage tests conducted by Pacific Northwest National Laboratory show that high uranium content K Basin sludge can self-cement and form a strong sludge with a bulk shear strength of up to 65 kPa. Some of this sludge has "paste" and "chunks" with shear strengths of approximately 3~5 kPa and 380 ~ 770 kPa, respectively. High uranium content sludge samples subjected to hydrothermal testing (e.g., 185°C, 10 h) have been observed to form agglomerates with a shear strength up to 170 kPa. After interim storage at T Plant, the sludge in the STSCs will be mobilized by water jets impinging the sludge. The objective of the evaluation was to determine the range of sludge shear strength for which there is high confidence that a water-jet retrieval system can mobilize stored K-Basin sludge from STSCs. The shear strength at which the sludge can be retrieved is defined as the "shear strength threshold of concern." If the sludge shear strength is greater than the value of the shear strength threshold of concern, a water-jet retrieval system will be unlikely to mobilize the sludge up to the container’s walls. The shear strength threshold of concern can be compared with the range of possible shear strengths of K-Basin stored sludge to determine if the current post interim-storage, water-jet retrieval method is adequate. Fourteen effective cleaning radius (ECR) models were reviewed, and their validity was examined by applying them to Hanford 241-SY-101 and 241-AZ-101 Tanks to reproduce the measured ECR produced by the mixer pumps. The validation test identified that the Powell-3 and Crowe-2 ECR models are more accurate than other ECR models reviewed. These ECR models were used to address a question as to whether the effective cleaning radius of a water jet is sufficient or if it can be readily expanded

  12. Management Review of Evaluation Practice.

    ERIC Educational Resources Information Center

    Stanfield, Jonathan

    Evaluation practice within state education agencies (SEAs) is reviewed from a management consultant's perspective. The study is based upon a review of literature, discussions with the Northwest Regional Educational Laboratory Research on Evaluation Program, and visits to SEAs in California, Montana and Washington. The main findings of the study…

  13. Comparing the accuracy of quantitative versus qualitative analyses of interim PET to prognosticate Hodgkin lymphoma: a systematic review protocol of diagnostic test accuracy

    PubMed Central

    Procházka, Vít; Klugar, Miloslav; Bachanova, Veronika; Klugarová, Jitka; Tučková, Dagmar; Papajík, Tomáš

    2016-01-01

    Introduction Hodgkin lymphoma is an effectively treated malignancy, yet 20% of patients relapse or are refractory to front-line treatments with potentially fatal outcomes. Early detection of poor treatment responders is crucial for appropriate application of tailored treatment strategies. Tumour metabolic imaging of Hodgkin lymphoma using visual (qualitative) 18-fluorodeoxyglucose positron emission tomography (FDG-PET) is a gold standard for staging and final outcome assessment, but results gathered during the interim period are less accurate. Analysis of continuous metabolic–morphological data (quantitative) FDG-PET may enhance the robustness of interim disease monitoring, and help to improve treatment decision-making processes. The objective of this review is to compare diagnostic test accuracy of quantitative versus qualitative interim FDG-PET in the prognostication of patients with Hodgkin lymphoma. Methods The literature on this topic will be reviewed in a 3-step strategy that follows methods described by the Joanna Briggs Institute (JBI). First, MEDLINE and EMBASE databases will be searched. Second, listed databases for published literature (MEDLINE, Tripdatabase, Pedro, EMBASE, the Cochrane Central Register of Controlled Trials and WoS) and unpublished literature (Open Grey, Current Controlled Trials, MedNar, ClinicalTrials.gov, Cos Conference Papers Index and International Clinical Trials Registry Platform of the WHO) will be queried. Third, 2 independent reviewers will analyse titles, abstracts and full texts, and perform hand search of relevant studies, and then perform critical appraisal and data extraction from selected studies using the DATARI tool (JBI). If possible, a statistical meta-analysis will be performed on pooled sensitivity and specificity data gathered from the selected studies. Statistical heterogeneity will be assessed. Funnel plots, Begg's rank correlations and Egger's regression tests will be used to detect and/or correct publication

  14. Evaluating architectural design review.

    PubMed

    Stamps, A E

    2000-02-01

    Architectural design review is a method of environmental management which is widely used by governmental agencies in both the United States and in Great Britain. Because design review is a governmental function, there is a major need to assess how well it works. Research covering over 29,000 respondents and 5,600 environmental scenes suggests that scientific protocols can be adapted to provide an accurate and efficient design review protocol. The protocol uses preference experiments to find the standardized mean difference [formula: see text] between a proposed project and a random sample of existing projects. Values of d will indicate whether the project will increase, maintain, or diminish the aesthetic merit of the sampled area. The protocol is illustrated by applying it to the case of design review for a single residence. Implications for further implementations are discussed.

  15. Interim Outcomes Assessment of the Comprehensive Clinical Performance Grid for Student Evaluation.

    ERIC Educational Resources Information Center

    Tolls, Dorothy Bazzinotti; Carlson, Nancy; Wilson, Roger; Richman, Jack

    2001-01-01

    Assessed the viability of the Comprehensive Clinical Performance Grid for Student Evaluation, introduced at The New England College of Optometry in 1996 in clinical student assessment. Analyzed faculty and student feedback and consistency with previous evaluations, between evaluators, and between clinical sites and tracts. Found satisfaction with…

  16. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  17. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  18. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  19. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  20. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES Methods and Standards for Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance...

  1. Waterford SES unit No. 3 control room design review/audit technical evaluation report

    SciTech Connect

    Smith, J.P.

    1981-06-01

    As part of the NRC staff actions following the TMI-2 accident (Item I.D.1, NUREG-0660, Vol. 1, May 1980), it is required that all licensees and applicants for operating licenses conduct a Detailed Control Room Design Review (DCRDR) to identify and correct human factors design deficiencies. Louisiana Power and Light Co. (LP and L) performed a preliminary assessment of the Waterford SES Unit No. 3 control room and submitted its findings to the NRC in a report dated April 15, 1981, for review and evaluation. The Human Factors Engineering Branch (HFEB) performed an interim review of the LP and L preliminary assessment report.

  2. Interim Guidelines for Evaluation of Instructional Materials with Respect to Social Content.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Curriculum Framework and Instructional Materials Unit.

    The purpose of these guidelines is to provide consistent, systematic standards for evaluating instructional materials proposed for use in California's public schools to ensure compliance with the Education Code. Though they are not intended to supplant the evaluator's judgment, the guidelines do comprise the minimum standards for acceptability in…

  3. Low Energy Utilization School: Research, Design, Construction, and Evaluation. Phase 1: Interim Report.

    ERIC Educational Resources Information Center

    Stein, Richard G.; Stein, Carl

    The purpose of this study was to establish more precisely what factors determine energy use in schools, to evaluate the efficiency of and necessity for these, and to make recommendations for the reduction of energy use. These recommendations will be applied to the design of specific projects that will be built, monitored, and evaluated. This…

  4. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  5. The Follow Through Planned Variation Experiment; Volume V. Appendix: Analysis of Interim Follow Through Evaluation Reports.

    ERIC Educational Resources Information Center

    Villaume, John; Haney, Walt

    This report is the appendix to the last volume in a five volume series on the national evaluation study of the Follow Through Planned Variation Model. The appendix is organized in three sections. Section I provides detailed summaries of five major national Follow Through evaluation reports not published as part of this series. Section II is an…

  6. Collection Analysis Project. Interim Report.

    ERIC Educational Resources Information Center

    Collier, Carol; And Others

    This interim report of the University of Wyoming's Collection Analysis Project, whose purpose is to examine the university library's collection development process and make workable recommendations for process improvement, consists of a brief history of the library's collection, including a review of the evolution of the collection development…

  7. Evaluation of Flexural Strength of Thermocycled Interim Resin Materials Used in Prosthetic Rehabilitation- An In-vitro Study

    PubMed Central

    Kadiyala, Krishna Kishore; Anne, Gopinadh; Anche, Sampath Chowdary; Chiramana, Sandeep; Muvva, Suresh Babu; Zakkula, Srujana; Jyothula, Ravi Rakesh Dev

    2016-01-01

    Introduction Provisional restoration is an analytical component of fixed prosthodontics serving as a ground plan for the design of fixed dental prosthesis. Flexural strength is critical in case of long standing fixed dental prosthesis, to appreciate success of full mouth rehabilitation cases and temporomandibular joint dysfunction therapies. Aim The present study was to evaluate the flexural strength of different provisional restorative resins used for prosthetic rehabilitation. Materials and Methods Forty identical samples (n=10 for each material) measuring 25mm×2mm×2mm according to ADA/ANSI specification no. 27 were fabricated using autopolymerizing Poly Methyl Methacrylate (PMMA) (Group A); heat activated PMMA (Group B); autopolymerizing Bis-GMA composite resin (Group C) and light activated Urethane Dimethacrylate Resin (UDMA) (Group D). For 14 days all these samples were stored in artificial saliva. Ten samples from each material were subjected to thermal cycling for 2500 cycles (5°C to 55°C). Later, a standard three point bending test was conducted on all the specimens with a universal testing machine at a crosshead speed of 0.75mm/min. Statistical analysis used included Kruskal-Wallis and Mann-Whitney U test. Results The mean flexural strength of specimens confirmed higher flexural strength for Group C (102.98 Mpa) followed by Group B (91.86 Mpa), Group A (79.13 Mpa) and Group D (60.01 Mpa). There were significant differences between any two materials tested (p <0.05). Comparison between mean flexural strength values between four groups revealed significant difference between the interim materials (p <0.05). Conclusion The greatest flexural strength was observed for Bis-GMA composite resins followed by heat cure methacrylate resins, autopolymerizing methacrylate resins and was least for light cure resins. While fabricating provisional restorations, these greater values should be considered for better outcome of the treatment. PMID:27790588

  8. National Evaluation of the Comprehensive Technical Assistance Centers. Interim Report. NCEE 2010-4033

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; White, Richard N.; Sinclair, Elizabeth; Riley, Derek; Sipe, Cynthia L.; Pistorino, Carol

    2010-01-01

    This first of two reports presents early findings from the National Evaluation of the Comprehensive Technical Assistance Centers (Comprehensive Centers), a federally funded program that provides technical assistance to states in connection with the No Child Left Behind (NCLB) Act of 2001. The law authorizing the Comprehensive Centers, the…

  9. STUDY AND TEST OF A METHODOLOGY FOR LABORATORY EVALUATION OF MESSAGE RETRIEVAL SYSTEMS. INTERIM REPORT.

    ERIC Educational Resources Information Center

    GIULIANO, VINCENT E.; JONES, PAUL E.

    THE MAIN OBJECTIVES OF THE ANALYSES INCLUDE--(1) A RESEARCH STUDY OF TECHNIQUES FOR THE EVALUATION OF ASSOCIATIVE AND COORDINATE MESSAGE RETRIEVAL METHODS. (2) THE PREPARATION AND ANALYSIS OF MACHINE-READABLE TEST CORPORA SUITABLE FOR EXPERIMENTS WITH ASSOCIATIVE MESSAGE RETRIEVAL METHODS. THESE CORPORA CONSIST OF APPROXIMATELY 10,000 MESSAGES AND…

  10. Evaluation of New Texas Charter Schools: Second Interim Report (2007-10). Executive Summary

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine

    2011-01-01

    The Texas Education Agency (TEA) was awarded Charter School Program (CSP) funding in 2007, and specified that the required evaluation would focus on the experiences and outcomes of new charter schools authorized to begin serving students across 4 school years: 2006-07, 2007-08, 2008-09, and 2009-10. TEA categorizes charter schools in terms of…

  11. An Evaluation of Jamestown Community College PROJECT HERCULES: First Stage Results. Interim Report.

    ERIC Educational Resources Information Center

    Olmstead, Joseph A.; Bushnell, David S.

    An evaluation study was conducted by Jamestown Community College (JCC) to determine the effects of PROJECT HERCULES. This demonstration project was initiated in 1974 to release selected staff members from routine tasks in order to assess community training and educational needs, communicate these needs to appropriate college personnel, and follow…

  12. The Grimes Alternative School Program and Home Remedies Program. Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Williams, Jay R.

    This report describes and evaluates two programs which deal with chronic status offenders: the Grimes Alternative School Program, a delinquency prevention project which targets intermediate school (grades 4 and 5) students with chronic discipline and/or truant behaviors, and the Home Remedies Program, a short-term crisis intervention and…

  13. Update: Interim Guidance for the Evaluation and Management of Infants with Possible Congenital Zika Virus Infection - United States, August 2016.

    PubMed

    Russell, Kate; Oliver, Sara E; Lewis, Lillianne; Barfield, Wanda D; Cragan, Janet; Meaney-Delman, Dana; Staples, J Erin; Fischer, Marc; Peacock, Georgina; Oduyebo, Titilope; Petersen, Emily E; Zaki, Sherif; Moore, Cynthia A; Rasmussen, Sonja A

    2016-08-26

    CDC has updated its interim guidance for U.S. health care providers caring for infants born to mothers with possible Zika virus infection during pregnancy (1). Laboratory testing is recommended for 1) infants born to mothers with laboratory evidence of Zika virus infection during pregnancy and 2) infants who have abnormal clinical or neuroimaging findings suggestive of congenital Zika syndrome and a maternal epidemiologic link suggesting possible transmission, regardless of maternal Zika virus test results. Congenital Zika syndrome is a recently recognized pattern of congenital anomalies associated with Zika virus infection during pregnancy that includes microcephaly, intracranial calcifications or other brain anomalies, or eye anomalies, among others (2). Recommended infant laboratory evaluation includes both molecular (real-time reverse transcription-polymerase chain reaction [rRT-PCR]) and serologic (immunoglobulin M [IgM]) testing. Initial samples should be collected directly from the infant in the first 2 days of life, if possible; testing of cord blood is not recommended. A positive infant serum or urine rRT-PCR test result confirms congenital Zika virus infection. Positive Zika virus IgM testing, with a negative rRT-PCR result, indicates probable congenital Zika virus infection. In addition to infant Zika virus testing, initial evaluation of all infants born to mothers with laboratory evidence of Zika virus infection during pregnancy should include a comprehensive physical examination, including a neurologic examination, postnatal head ultrasound, and standard newborn hearing screen. Infants with laboratory evidence of congenital Zika virus infection should have a comprehensive ophthalmologic exam and hearing assessment by auditory brainstem response (ABR) testing before 1 month of age. Recommendations for follow-up of infants with laboratory evidence of congenital Zika virus infection depend on whether abnormalities consistent with congenital Zika syndrome

  14. Airworthiness and Flight Characteristics Evaluation. OH-58C Interim Scout Helicopter

    DTIC Science & Technology

    1979-04-01

    stacks. A _btn.ian factors evaluation of the cockpit revealed one deficiency (the night vision goggle switch is easily adtivited and renders the...A night vision goggle ENABLE/DISABLE switch has been added to all aircraft solving this problem. (7) Para lOOg - The incorporation of a SCAS will...the night vision goggle switch is easily activated and renders the caution/advisory panel unreadable), and fourteen shortcomings. Two maintenance

  15. Evaluation of Juvenile Fall Chinook Stranding on the Hanford Reach, 1997-1999 Interim Report.

    SciTech Connect

    Wagner, Paul; Nugent, John; Price, William

    1999-02-15

    Pilot work conducted in 1997 to aid the development of the study for the 1998 Evaluation of Juvenile Fall Chinook Stranding on The Hanford Reach. The objectives of the 1997 work were to: (1) identify juvenile chinook production and rearing areas..., (2) identify sampling sites and develop the statistical parameters necessary to complete the study, (3) develop a study plan..., (4) conduct field sampling activities...

  16. Program Alternatives to Special Education. Interim Report on 1985-86. O.E.A. Evaluation Report.

    ERIC Educational Resources Information Center

    Hebard, Amy J.; And Others

    This interim report on the Program Alternatives to Special Education (PASE) program in New York City: (1) describes strategies offered by 32 districts that provide program alternatives to special education referrals; (2) elucidates the strengths and weaknesses of program designs and highlights factors having positive effects on at-risk children;…

  17. Atmospheric effects of stratospheric aircraft: An evaluation of NASA's interim assessment

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The advent of high-speed civil transport aircraft (HSCT's) some 25 years ago generated considerable concern about potential impacts on the stratosphere. With interest in such aircraft again increasing, NASA initiated an assessment of the potential stratospheric impacts of a substantial increase in the use of HSCT's. This assessment was intended to examine, from the standpoint of present scientific understanding, the potential atmospheric impacts of a fleet of high-speed civil transports flying supersonically in the lower stratosphere. The program was initiated in 1991, and the bulk of its research is scheduled to be completed in 1995. In early 1993 NASA asked the National Research Council to review its efforts. This report documents its findings and recommendations.

  18. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  19. Plug-In Hybrid Electric Vehicle Value Proposition Study: Interim Report: Phase I Scenario Evaluation

    SciTech Connect

    Sikes, Karen R; Markel, Lawrence C; Hadley, Stanton W; Hinds, Shaun; DeVault, Robert C

    2009-01-01

    Plug-in hybrid electric vehicles (PHEVs) offer significant improvements in fuel economy, convenient low-cost recharging capabilities, potential environmental benefits, and decreased reliance on imported petroleum. However, the cost associated with new components (e.g., advanced batteries) to be introduced in these vehicles will likely result in a price premium to the consumer. This study aims to overcome this market barrier by identifying and evaluating value propositions that will increase the qualitative value and/or decrease the overall cost of ownership relative to the competing conventional vehicles and hybrid electric vehicles (HEVs) of 2030 During this initial phase of this study, business scenarios were developed based on economic advantages that either increase the consumer value or reduce the consumer cost of PHEVs to assure a sustainable market that can thrive without the aid of state and Federal incentives or subsidies. Once the characteristics of a thriving PHEV market have been defined for this timeframe, market introduction steps, such as supportive policies, regulations and temporary incentives, needed to reach this level of sustainability will be determined. PHEVs have gained interest over the past decade for several reasons, including their high fuel economy, convenient low-cost recharging capabilities, potential environmental benefits and reduced use of imported petroleum, potentially contributing to President Bush's goal of a 20% reduction in gasoline use in ten years, or 'Twenty in Ten'. PHEVs and energy storage from advanced batteries have also been suggested as enabling technologies to improve the reliability and efficiency of the electric power grid. However, PHEVs will likely cost significantly more to purchase than conventional or other hybrid electric vehicles (HEVs), in large part because of the cost of batteries. Despite the potential long-term savings to consumers and value to stakeholders, the initial cost of PHEVs presents a major

  20. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  1. Interim findings of an evaluation of the U.S. EnergyGuide label

    SciTech Connect

    Egan, Christine; Payne, Christopher T.; Thorne, Jennifer

    2000-08-20

    The United States has labeled appliances with the EnergyGuide labels since 1980. Consensus is growing that this label is confusing to consumers and has little impact on purchase decisions. Many researchers have documented that alternative labeling approaches are effective in other countries. The authors comprehensively evaluated the U.S. appliance labeling program for white goods, heating and cooling equipment, and water heaters, with emphasis on products sold through retail outlets. To date, our research has included consumer focus groups and semi-structured interviews with various market actors to assess how best to communicate energy information. With consumers and retail sales staff, five graphical designs were tested a European-style, letter based graphic; an Australian-style star-based graphic; a speedometer-style graphic; a thermometer-style graphic; and the current U.S. style. With manufacturers and contractors, we did not directly test alternate designs. Instead, we asked their opinion of and experience with the current EnergyGuide labeling program.

  2. WWC Review of the Report "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading Achievement." What Works Clearinghouse Single Study Review

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2015

    2015-01-01

    The study authors examined the effects of using "Diagnostic Assessment Tools" ("DAT") on mathematics and reading outcomes for students in Indiana schools during the 2009-10 academic year. "DAT" consists of interim assessment tools--Wireless Generation's mCLASS for students in grades K-2 and CTB/ McGraw-Hill's Acuity…

  3. Job Enrichment: Evaluation with Implications for Air Force Job Redesign. Interim Report, 1 January 1975-30 April 1977.

    ERIC Educational Resources Information Center

    Watson, Thomas W.; Zumbro, Patrick A.

    The main text of this report consists of a review and evaluation of job enrichment as an approach to job redesign, with implications for Air Force research and application. In addition, two appendixes are included: the first, a supplemental historical discussion; the second, a ninety-six-item annotated bibliography. Specific objectives are to…

  4. 5 CFR 1201.116 - Appellant requests for enforcement of interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... interim relief. 1201.116 Section 1201.116 Administrative Personnel MERIT SYSTEMS PROTECTION BOARD... Appellant requests for enforcement of interim relief. (a) Before a final decision is issued. If the agency files a petition for review or a cross petition for review and has not provided required interim...

  5. Evaluation and Analysis of SEASAT-A Scanning Multichannel Microwave Radiometer (SSMR) Antenna Pattern Correction (APC) Algorithm. Sub-task 4: Interim Mode T Sub B Versus Cross and Nominal Mode T Sub B

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.

  6. Monitoring versus interim analysis of clinical trials: a perspective from the pharmaceutical industry.

    PubMed

    Enas, G G; Dornseif, B E; Sampson, C B; Rockhold, F W; Wuu, J

    1989-03-01

    The definitions of "interim analysis" and "monitoring" of clinical trials are often ambiguous in the current literature. The resulting confusion can lead to erroneous conclusions and misguided decisions, especially when activities that are operational or observational are evaluated in a probabilistic sense as inferential. The authors seek to define "interim analysis" and "monitoring" in a mutually exclusive fashion. These definitions will then provide the opportunity to review and categorize existing clinical trial practices and procedures. This will clarify such issues as "when to look" and "when to pay a price" (e.g., test size and power) and characterize such issues in the context of pharmaceutical industry drug development.

  7. Investigations of emergency destruction methods for recovered, explosively configured, chemical warfare munitions: Interim emergency destruction methods - evaluation report

    SciTech Connect

    Baer, M.R.; Cooper, P.W.; Kipp, M.E.

    1995-07-01

    At the request of the U.S. Army Non-Stockpile Chemical Material Office, the Sandia Explosives Containment System Design Team investigated mature destruction systems for destroying recovered chemical warfare munitions (CWM). The goal of the investigations was to identify and examine available techniques for the destruction of recovered CWM. The result of this study is a recommendation for an interim solution, a solution for use on any munitions found while an optimal, long-term solution is developed. Sandia is also performing the long-term solution study to develop a system that destroys CWM, contains the blast and fragments, and destroys the chemical agent without insult to the environment.

  8. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  9. Evaluation of higher distribution and/or utilization voltages. Third interim report (October 1979): analysis of individual component cost and/or energy efficiencies

    SciTech Connect

    Not Available

    1981-04-01

    This interim report provides documentation on the third task, Analysis of Individual Component Cost and/or Energy Efficiencies, of DOE Contract No. ET-78-C-01-2866, Evaluation of Higher Distribution and/or Utilization Voltages. The work performed under this task includes the development of both cost and energy loss models for the distribution and customer utilization system elements as well as the analysis of critical performance variables for the types of motors in end use elements, as a function of voltage level. The purpose of this task is to provide individual component cost and energy models which will be incorporated in the global system optimization program under Task 4. A major output of this task is a mathematical model for each component's cost and/or energy losses and a graphical representation of each model.

  10. Evaluation of gasification and gas cleanup processes for use in molten-carbonate fuel-cell power plants. Task B interim report

    SciTech Connect

    Not Available

    1981-12-01

    This interim report satisfies the Task B requirement for DOE Contract DE-AC21-81MC16220 to define process configurations for systems suitable for supplying fuel to molten carbonate fuel cells (MCFC) in industrial and utility power plants. The information and data necessary for this study were extracted from sources in the public domain, including reports from DOE, EPRI, and EPA; work sponsored in whole or in part by Federal agencies; and from trade journals, MCFC developers, and manufacturers. The configurations include entrained, fluidized-bed, gravitating-bed, and molten salt gasifiers, both air and oxygen blown. Desulfurization systems utilizing wet scrubbing processes, such as Selexol and Rectisol II, and dry sorbents, such as iron oxide and dolomite, were chosen for evaluation.

  11. Cataract surgery: interim results and complications of a randomised controlled trial. Oxford Cataract Treatment and Evaluation Team (OCTET).

    PubMed Central

    1986-01-01

    A randomised controlled trial in progress for more than five years, with no loss to follow-up (except death), assessed 333 eyes treated by three methods of cataract surgery. They were (A) intracapsular extraction and contact lens usage, (B) intracapsular extraction and implantation of an iris supported lens (Federov I), and (C) extracapsular extraction and implantation of an iridocapsular lens (Binkhorst 2-loop). The purpose of the paper is to report interim visual results, complications, and corneal endothelial cell loss. More eyes in groups A (contact lens) and C (extracapsular + implant) achieved better visual acuity than in group B (intracapsular + Federov lens), which also had more postoperative complications. Both implant groups lost more endothelial cells than the non-implant group, which did not differ significantly from group B before one year. PMID:2872913

  12. Evaluation of surface-based inversions from ERA-Interim and satellite data over Antarctica using dropsonde data from the 2010 Concordiasi Experiment

    NASA Astrophysics Data System (ADS)

    Boylan, Patrick; Wang, Junhong; Cohn, Steve; Hultberg, Tim; August, Thomas; Fetzer, Eric; Maddy, Eric; Wong, Sun

    2015-04-01

    Surface-based inversions (SBI), where atmospheric temperature increases with height from the surface, occur very frequently over Antarctica. SBIs play an important role in Antarctic climate; however, much less is known about the characteristics of SBIs over Antarctica than the Arctic. This is mainly due to the scarcity of upper and lower tropospheric observations over Antarctica. The Concordiasi field experiment provided unprecedented high quality meteorological profiles over Antarctica and the surrounding ocean, especially over the continent where satellite retrievals are challenging. Between September and December 2010, a total of 639 dropsondes soundings were obtained as part of Concordiasi. This study uses the SBIs derived from the Concordiasi high-resolution dropsonde data to evaluate SBI properties from ERA-Interim reanalysis and products from two hyper-spectral satellite instruments, the Advanced InfraRed Sounder (AIRS) and the Infrared Atmospheric Sounding Interferometer (IASI). All three products are operational and are available over the entire Antarctic region. Preliminary analyses reveal that with recently released versions of AIRS and IASI, occurrences of a SBI agree with the dropsonde data in ~80% of the cases. Analyses with AIRS and ERA-Interim conclude that surface air temperature, not vertical resolution, is the limiting factor in the ability to detect and characterize SBIs. We find SBIs to be more frequent, more intense, and deeper over the continent than over the surrounding ocean and sea ice. The results are very encouraging for future usage of satellite and reanalysis data to study Antarctic SBIs. If the three operational products are successfully validated, they will be used to study SBI variability beyond the time period of the Concordiasi campaign, including studying long-term SBI trends.

  13. Evaluation of tuff as a medium for a nuclear waste repository: interim status report on the properties of tuff

    SciTech Connect

    Johnstone, J.K.; Wolfsberg, K.

    1980-07-01

    This report is the second in a series of summary briefings to the National Academy of Science`s (NAS) Committee on Radioactive Waste Management dealing with feasibility of disposal of heat-producing radioactive waste in silicic tuff. The interim status of studies of tuff properties determined on samples obtained from Yucca Mountain and Rainier Mesa (G-tunnel) located on the Nevada Test Site (NTS) are discussed. In particular, progress is described on resolving issues identified during the first briefing to the NAS which include behavior of water in tuff when heated, the effect of the presence or absence of water and joints on the thermal/physical properties of tuff and the detailed/complex sorptive properties of highly altered and unaltered tuff. Initial correlations of thermal/physical and sorptive properties with the highly variable porosity and mineralogy are described. Three in-situ, at-depth field experiments, one nearly completed and two just getting underway are described. In particular, the current status of mineralogy and petrology, geochemistry, thermal and mechanical, radiation effects and water behavior studies are described. The goals and initial results of a Mine Design Working Group are discussed. Regional factors such as seismicity, volcanism and hydrology are not discussed.

  14. Evaluation of the Steel Creek ecosystem in relation to the proposed restart of the L-Reactor: interim report

    SciTech Connect

    Not Available

    1983-09-01

    This interim report of findings from studies by SREL has updated information on several key components of the Steel Creek ecosystem. We have emphasized two categories of the Steel Creek biota: Endangered Species (American alligator) and species for which environmental degradation within SRP boundaries might result in changes in offsite resource abundance. Wintering waterfowl surveys in the vicinity of the Steel Creek delta have demonstrated a pattern of increased utilization over the duration of these studies (1981-83). Wood stork utilization of SRP swamp areas also appeared to be substantially increased relative to previous years. Thermal alteration of the Steel Creek delta areas will eliminate this area as wood stork foraging habitat. Anadromous fish utilization of the Steel Creek area was also substantially increased in 1983 relative to 1982. The differences in anadromous fish species utilization patterns between 1982 and 1983 are probably a result of the markedly different river flow conditions between the two years. Studies of the American alligator have continued. No further reproduction by alligators has been observed in the Steel Creek system. 24 references, 14 figures, 13 tables.

  15. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    SciTech Connect

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs.

  16. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    SciTech Connect

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document.

  17. Evaluation of interim and final waste forms for the newly generated liquid low-level waste flowsheet

    SciTech Connect

    Abotsi, G.M.K.; Bostick, D.T.; Beck, D.E.

    1996-05-01

    The purpose of this review is to evaluate the final forms that have been proposed for radioactive-containing solid wastes and to determine their application to the solid wastes that will result from the treatment of newly generated liquid low-level waste (NGLLLW) and Melton Valley Storage Tank (MVST) supernate at the Oak Ridge National Laboratory (ORNL). Since cesium and strontium are the predominant radionuclides in NGLLLW and MVST supernate, this review is focused on the stabilization and solidification of solid wastes containing these radionuclides in cement, glass, and polymeric materials-the principal waste forms that have been tested with these types of wastes. Several studies have shown that both cesium and strontium are leached by distilled water from solidified cement, although the leachabilities of cesium are generally higher than those of strontium under similar conditions. The situation is exacerbated by the presence of sulfates in the solution, as manifested by cracking of the grout. Additives such as bentonite, blast-furnace slag, fly ash, montmorillonite, pottery clay, silica, and zeolites generally decrease the cesium and strontium release rates. Longer cement curing times (>28 d) and high ionic strengths of the leachates, such as those that occur in seawater, also decrease the leach rates of these radionuclides. Lower cesium leach rates are observed from vitrified wastes than from grout waste forms. However, significant quantities of cesium are volatilized due to the elevated temperatures required to vitrify the waste. Hence, vitrification will generally require the use of cleanup systems for the off-gases to prevent their release into the atmosphere.

  18. Interim Guidance on Cost Review of Grants/Performance Partnership Grants Awarded under 40 CFR Part 35 Subpart A

    EPA Pesticide Factsheets

    This cost-review approach applies to all program and PPG awards made under 40 CFR Part 35, Subpart A, where the recipient has an established, on-going grant relationship with EPA and has adequate internal controls in its personnel.

  19. The Relationship of Apgar Scores to Neonatal Survival and Later Development: A Review. Interim Report No. 19.

    ERIC Educational Resources Information Center

    Rubin, Rosalyn A.; And Others

    This paper presents a review of the literature concerning the infant Apgar scoring system and its relationship to later mental and motor development. Since 1952, the Apgar scoring system has provided a viable means of assessing the infant's immediate postnatal condition. Researchers have demonstrated that while the 1-minute Apgar score is a useful…

  20. Literature review and ethnohistory of Native American occupancy and use of the Yucca Mountain Region; Yucca Mountain Project, Interim report

    SciTech Connect

    Stoffle, R.W.; Olmsted, J.E.; Evans, M.J.

    1990-01-01

    This report presents a review of the literature concerning Native American occupancy and use of the Yucca Mountain area and vicinity. It draws on a wide range of material, including early traveler reports, government documents, ethnographic and historical works, and local newspapers. The report complements two other concurrent studies, one focused on the cultural resources of Native American people in the study area and the other an ethnobotanical study of plant resources used by Native American people in the study area. The literature review has had two principal purposes: to determine the completeness of the Yucca Mountain Native American study design and to contribute to the understanding of the presence of Native American people in the Yucca Mountain area. A review of the existing literature about the Yucca Mountain area and southern Nye County, supplemented by the broader literature about the Great Basin, has verified three aspects of the study design. First, the review has aided in assessing the completeness of the list of Native American ethnic groups that have traditional or historical ties to the site. Second, it has aided in the production of a chronology of Native American activities that occurred on or near the site during the late nineteenth and early twentieth centuries. Third, it has helped to identify the location of cultural resources, including burials and other archaeological sites, in the study area and vicinity. 200 refs., 16 figs., 6 tabs.

  1. Engineering evaluation/cost analysis for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri -- environment assessment

    SciTech Connect

    Picel, M H; Peterson, J M; Williams, M J

    1991-05-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures. 25 refs., 4 figs., 6 tabs.

  2. Engineering evaluation/cost analysis-environmental assessment for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri

    SciTech Connect

    Picel, M H; Peterson, J M; Williams, M J

    1992-03-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures.

  3. Interim Guidance on New Source Review (NSR) Questions Raised in Letters Dated September 9 and 24, 1992.

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. Evaluation of land surface model representation of phenology: an analysis of model runs submitted to the NACP Interim Site Synthesis

    NASA Astrophysics Data System (ADS)

    Richardson, A. D.; Nacp Interim Site Synthesis Participants

    2010-12-01

    Phenology represents a critical intersection point between organisms and their growth environment. It is for this reason that phenology is a sensitive and robust integrator of the biological impacts of year-to-year climate variability and longer-term climate change on natural systems. However, it is perhaps equally important that phenology, by controlling the seasonal activity of vegetation on the land surface, plays a fundamental role in regulating ecosystem processes, competitive interactions, and feedbacks to the climate system. Unfortunately, the phenological sub-models implemented in most state-of-the-art ecosystem models and land surface schemes are overly simplified. We quantified model errors in the representation of the seasonal cycles of leaf area index (LAI), gross ecosystem photosynthesis (GEP), and net ecosystem exchange of CO2. Our analysis was based on site-level model runs (14 different models) submitted to the North American Carbon Program (NACP) Interim Synthesis, and long-term measurements from 10 forested (5 evergreen conifer, 5 deciduous broadleaf) sites within the AmeriFlux and Fluxnet-Canada networks. Model predictions of the seasonality of LAI and GEP were unacceptable, particularly in spring, and especially for deciduous forests. This is despite an historical emphasis on deciduous forest phenology, and the perception that controls on spring phenology are better understood than autumn phenology. Errors of up to 25 days in predicting “spring onset” transition dates were common, and errors of up to 50 days were observed. For deciduous sites, virtually every model was biased towards spring onset being too early, and autumn senescence being too late. Thus, models predicted growing seasons that were far too long for deciduous forests. For most models, errors in the seasonal representation of deciduous forest LAI were highly correlated with errors in the seasonality of both GPP and NEE, indicating the importance of getting the underlying

  5. Evaluating a Systemic Reform Project at the School District Level. Interim Report for the Fresno Systemic Program.

    ERIC Educational Resources Information Center

    Calhoun, Dave

    Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…

  6. The combined evaluation of interim contrast-enhanced computerized tomography (CT) and FDG-PET/CT predicts the clinical outcomes and may impact on the therapeutic plans in patients with aggressive non-Hodgkin's lymphoma.

    PubMed

    Yang, Deok-Hwan; Min, Jung-Joon; Jeong, Yong Yeon; Ahn, Jae-Sook; Kim, Yeo-Kyeoung; Cho, Sang-Hee; Chung, Ik-Joo; Bom, Hee-Seung; Kim, Hyeoung-Joon; Lee, Je-Jung

    2009-05-01

    We investigated the concomitant interim response of patients with aggressive non-Hodgkin's lymphoma (NHL) using multi-detector row computerized tomography (CT) and (18)F-fluoro-2-deoxy-D: -glucose-positron emission tomography (PET)/CT for prediction of clinical outcomes. One hundred six newly diagnosed patients with aggressive NHL were enrolled. Both the CT and PET/CT were serially performed at the time of diagnosis and after three to four cycles of chemotherapy (interim). The patients were categorized into four different responsive groups according to the interim PET/CT and CT: (1) complete metabolic response (CMR)-complete response unconfirmed (CRu), (2) CMR-partial response (PR), (3) partial metabolic response (PMR)-Cru, and (4) PMR-PR. Fifty-five patients with CMR-CRu, 20 patients with CMR-PR, seven patients with PMR-Cru, and 23 patients with PMR-PR were distributed. In addition, one patient experienced a disease progression. There was a significant difference in relapse rates between PET/CT-positive (67.3%) and PET/CT-negative patients (17.3%; P < 0.01). Also, there was a significant difference between patients with PMR-PR (32.0% and 26.1%) and CMR-CRu (89.3% and 80.0%) for 3-year overall survival (OS) and event-free survival (EFS), respectively. A multivariate analysis revealed that high international prognostic index (> or =3) at diagnosis, T-cell phenotype, and PMR-PR in interim PET/CT and CT were independent prognostic significances for OS. Moreover, bulky disease (>10 cm), T-cell phenotype, and PMR-PR showed significant associations for EFS. PMR-PR in interim response was the predictive prognostic determinant for both OS and EFS, with a hazard ratio of 3.93 (1.61-9.60) and 3.60 (1.62-7.98), respectively. The combined evaluation of interim PET/CT and CT was found to be a significant predictor of disease progression, OS, and EFS.

  7. An Annotated Bibliography on Social Reinforcement: Evaluative Abstracts of Research and Theory. Interim Report, June 1972-October 1973.

    ERIC Educational Resources Information Center

    Klimoski, Richard J.; And Others

    An annotated bibliography of studies dealing with social reinforcement in diverse psychological and educational contexts is given. The research reviewed covers the period from 1964 to 1972, and individual studies are classified according to classes of variables which have been found to moderate the effectiveness of social reinforcement. All told,…

  8. Online Education Interim Report

    ERIC Educational Resources Information Center

    Protopsaltis, Spiros, Ed.

    2007-01-01

    This interim report produced by the Colorado State Board of Education Online Education Task Force examines key issues related to online education. Task force members agree that: (1) online education has become a viable element of Colorado's public education system; (2) the role of technology in educating our children will continue to grow; and (3)…

  9. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    SciTech Connect

    Nugent, John; Newsome, Todd; Nugent, Michael

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  10. An Evaluation of Three English Methodology Courses as Preparation for Teaching English in the Secondary School. Interim Report.

    ERIC Educational Resources Information Center

    Snider, June

    Evaluations of three English methodology courses at Bradley University, Illinois, were made to determine which course or combination of courses was most effective in preparing the student to teach English in the secondary school. Questionnaires completed by Bradley graduates teaching English in secondary schools indicated that none of the three…

  11. EVALUATION OF THE EFFECTIVENESS OF COATINGS IN REDUCING DISLODGEABLE ARSENIC, CHROMIUM, AND COPPER FROM CCA TREATED WOOD, INTERIM DATA REPORT

    EPA Science Inventory

    EPA is approximately 20 months into a project to evaluate the performance of wood coatings as a way to prevent arsenic, chromium and copper exposure from the surfaces of CCA treated wood. Potential dermal exposure, as measured by wipe sampling dislodgeable CCA chemical from wood ...

  12. Evaluation of Worker Profiling and Reemployment Services Systems: Interim Report. Unemployment Insurance Occasional Paper 96-1.

    ERIC Educational Resources Information Center

    Hawkins, Evelyn K.; And Others

    The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…

  13. Grant Computer Managed Individualized Learning Project (PLAN*). The interim Evaluation Report (July 1, 1972-June 30, 1973).

    ERIC Educational Resources Information Center

    Saint Louis Board of Education, MO.

    Four instructional management programs, the Duluth Project, IGE Project, the IPI Project, and PLAN Project, were evaluated, contrasted, and compared with development of an inhouse program for the St. Louis public schools. The main criteria were: developmental and operational costs; degree of individualization; the use of behavioral objectives,…

  14. Interim Evaluation of the Pilot Program of the Truancy Case Management Partnership Intervention in the District of Columbia

    ERIC Educational Resources Information Center

    Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey

    2012-01-01

    The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…

  15. Upcoming IJTMB Initiatives from the Interim Executive Editor

    PubMed Central

    Kennedy, Ann Blair

    2016-01-01

    It is an honor and a privilege to be appointed the Interim Executive Editor for the IJTMB; I am lucky to have some initiatives that were already in development by the previous editorial team that I hope to bring to fruition over the next few months. First, I hope to increase the Journal’s Internet presence through social media to expand readership and encourage new submitters. The second initiative is a mentoring program to assist writers with their submissions to the Journal. Finally, I, and the rest of the editorial staff, will continue to evaluate the process, procedures, and forms used in peer review. I hope to move these initiatives forward and by doing so, bring in new readers, submitters, and reviewers to the Journal. PMID:27974945

  16. Effects of a Universally Free, In-Classroom School Breakfast Program: Results from the Second Year of the Maryland Meals for Achievement Evaluation. Interim Report.

    ERIC Educational Resources Information Center

    Murphy, J. Michael; Rankin, Emunah; Feeney, Kelly; Kenney, Leigh; Kleinman, Ron

    Noting that many children in the United States are not well nourished despite the recent economic boom, the state of Maryland began the Maryland Meals for Achievement (MMFA) program, a demonstration project to see if providing a classroom breakfast free to all students can improve student nutrition and academic achievement. This interim report…

  17. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  18. Forensic child abuse evaluation: a review.

    PubMed

    Laraque, Danielle; DeMattia, Amy; Low, Christine

    2006-12-01

    This review discusses the forensic medical and psychological assessments of children and adolescents suspected of being victims of sexual or physical abuse/neglect. Evaluation of the whole child and the need to minimize trauma during the investigative and assessment processes are stressed. The forensic medical examination is reviewed, including the specifics of the pediatric anogenital examination. The key components of the forensic medical examination in sexual assault cases are also reviewed, with particular attention to maintaining the integrity of the process. Special emphasis is placed on the forensic interview in child sexual abuse cases, the best evidence available and areas in need of further research.

  19. Implementation and adoption of nationwide electronic health records in secondary care in England: qualitative analysis of interim results from a prospective national evaluation

    PubMed Central

    Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate

    2010-01-01

    Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting

  20. Computer-Based Exercises in Anemia and Chest Pain Diagnosis: An Interim Evaluation of the PlanAlyzer Project

    PubMed Central

    Lyon, Harold C.; Healy, James C.; Bell, James R.; O'Donnell, Joseph F.; Hirai, Frank; Moore-West, Margaret; Cornwell, Gibbons G.; Brooks, W. Blair; Spackman, Kent A.; Beck, J. Robert

    1990-01-01

    PlanAlyzer is a microcomputer-based, self-paced, case-based, event-driven system for medical education. Aimed at the second year medical student, PlanAlyzer presents cases, elicits and critiques a student's approach to the diagnosis of two common medical disorders: anemias and chest pain. PlanAlyzer uses text, hypertext, images and critiquing theory. Students were randomized, one half becoming the experimental group who received the interactive PlanAlyzer cases in anemia, the other half becoming the controls who received the exact same content material in a text format. Later in each year there was a crossover, the controls becoming the experimentals for a similar intervention with the cardiology PlanAlyzer cases. Preliminary results at the end of the first two trials shows that the programs have achieved most of the proposed instructional objectives, plus some significant efficiency and economy gains. 96 faculty hours of classroom time were saved by using PlanAlyzer in their place, while, maintaining high student achievement. In terms of student proficiency and efficiency, the 176 students in the trial were able to accomplish the project's instructional objectives, and the experimentals accomplished this in less time than the controls. The research suggests additional inquiry in several areas: better evaluation instruments to measure the problem solving skills PlanAlyzer was designed to teach; use of hypertext PlanAlyzer cases to find if such a mode results in performance and/or efficiency differences; through the addition of interactive video, broaden PlanAlyzer to include additional behaviors subsumed under the topic of clinical problem solving, such as patient management strategies and the role of patients' affective behavior and non-verbal cues in the data gathering process.

  1. Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants

    SciTech Connect

    Mays, Gary T; Belles, Randy; Cetiner, Sacit M; Howard, Rob L; Liu, Cheng; Mueller, Don; Omitaomu, Olufemi A; Peterson, Steven K; Scaglione, John M

    2012-06-01

    The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

  2. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2011-02-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 27%. A GPCP-corrected version of ERA-Interim is less biased (13%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6 Wm-2, ERA-Interim overestimates the ISR by 10 Wm-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  3. Verification of the new ECMWF ERA-Interim reanalysis over France

    NASA Astrophysics Data System (ADS)

    Szczypta, C.; Calvet, J.-C.; Albergel, C.; Balsamo, G.; Boussetta, S.; Carrer, D.; Lafont, S.; Meurey, C.

    2010-09-01

    An evaluation of the global ECMWF atmospheric reanalysis ERA-Interim (with a 0.5° grid) is performed over France, based on the high resolution (8 km) SAFRAN atmospheric reanalysis. The ERA-Interim precipitation, Incoming Solar Radiation (ISR), air temperature, air humidity, and wind speed, are compared with their SAFRAN counterparts. Also, interpolated in situ ISR observations are used in order to consolidate the evaluation of this variable. The daily precipitation estimates produced by ERA-Interim over France correlate very well with SAFRAN. However, the values are underestimated by 26%. A GPCP-corrected version of ERA-Interim is less biased (10-15%). The ERA-Interim estimates of ISR correlate very well with SAFRAN and with in situ observations on a daily basis. Whereas SAFRAN underestimates the ISR by 6-8 W m-2, ERA-Interim overestimates the ISR by 9-10 W m-2. In order to assess the impact of the ERA-Interim errors, simulations of the ISBA-A-gs land surface model are performed over the SMOSREX grassland site in southwestern France using ERA-Interim (with and without GPCP rescaling) and SAFRAN. Latent and sensible heat fluxes are simulated, together with carbon dioxide fluxes. The rescaled ERA-Interim performs better than the original ERA-Interim and permits to achieve flux scores similar to those obtained with SAFRAN.

  4. Review of "SCDP Milwaukee Evaluation Report #32"

    ERIC Educational Resources Information Center

    Cobb, Casey D.

    2012-01-01

    The School Choice Demonstration Project has published a series of reports written in the fifth and final year of its evaluation of the Milwaukee Parental Choice Program (MPCP). This review is of Report #32, which compares the test performance of MPCP students to that of a sample of students from the Milwaukee Public Schools (MPS). The comparisons…

  5. Review of "SCDP Milwaukee Evaluation Report #29"

    ERIC Educational Resources Information Center

    Cobb, Casey D.

    2012-01-01

    The School Choice Demonstration Project has published a series of reports written in the fifth and final year of its evaluation of the Milwaukee Parental Choice Program (MPCP). This review is of "Report #29," a five-year longitudinal growth study, which found that a sample of elementary and middle school MPCP students outperformed a…

  6. Interim Assessments: A User's Guide

    ERIC Educational Resources Information Center

    Marshall, Kim

    2008-01-01

    Interim assessments are hot in American schools. Also called benchmark or periodic tests, these assessments are given every four to nine weeks to check on students' progress. Although interim assessments are an important tool for school improvement, they are easy to misuse. In the author's work coaching principals in a number of districts, he has…

  7. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  8. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    SciTech Connect

    L. V. Street

    2007-04-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

  9. Transforming Writing: Interim Evaluation Report

    ERIC Educational Resources Information Center

    Rooke, Jonathan

    2012-01-01

    Transforming Writing is a two-year action research project which aims to develop a model for the teaching and learning of writing that more fully incorporates a focus on embedded formative assessment. In the first year of the project, the 12 participating schools developed a model of writing underpinned by Talk for Writing, an approach developed…

  10. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  11. Technology and outpatient review: a preliminary evaluation.

    PubMed

    Bergman, A; Henderson, M; Cline, J L

    1990-06-01

    Most health care utilization and cost control programs focus on inpatient care or on high-cost, catastrophic illnesses or injuries. Recently, however, Parkside Health Management Corporation has developed a utilization review program that targets treatments and high-technology procedures performed primarily in an outpatient setting, as well as specific inpatient procedures not included in other review programs. These include chiropractic, podiatric, and physical therapy treatments; cesarean section; and endoscopy, ultrasound in pregnancy, and lithotripsy. The treatments/procedures examined in this program, called Technology and Outpatient Review (TOR), account for approximately 6% of claims expenses. Bigel Institute for Health Policy researchers are evaluating a pilot test to determine TOR's effect on health care costs and utilization, appropriateness, and patient satisfaction.

  12. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Bureau of Indian Affairs Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines... publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements... of 2010. Three Interim Model Deputation Agreements will be used: one agreement for tribes in...

  13. Toxicity evaluation and hazard review Cold Smoke

    SciTech Connect

    Archuleta, M.M.; Stocum, W.E.

    1993-12-01

    Cold Smoke is a dense white smoke produced by the reaction of titanium tetrachloride and aqueous ammonia aerosols. Early studies on the toxicity of this nonpyrotechnically generated smoke indicated that the smoke itself is essentially non-toxic (i.e. exhibits to systemic toxicity or organ damage due to exposure) under normal deployment conditions. The purpose of this evaluation was to review and summarize the recent literature data available on the toxicity of Cold Smoke, its chemical constituents, and its starting materials.

  14. 49 CFR 1182.7 - Interim approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Interim approval. 1182.7 Section 1182.7....7 Interim approval. (a) A party may request interim approval of the operation of the properties... additional filing fee is required, whether the request for interim approval is included in the application...

  15. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in...

  16. Fabrication of an Implant-Supported Fixed Interim Prosthesis Using a Duplicate Denture: An Alternative Technique.

    PubMed

    Al-Thobity, Ahmad M

    2016-06-22

    The fabrication of an implant-supported fixed complete denture prosthesis involves multiple clinical and laboratory steps. One of the main steps is to provide the patient with an interim fixed prosthesis to evaluate the patient's esthetic and functional needs as well as to enhance the patient's psychology before proceeding to the definitive prosthesis. Different techniques for fabricating interim prostheses have been described in the literature. This report describes an alternative technique that uses a duplicate denture made of self-curing acrylic resin to fabricate an implant-supported fixed interim prosthesis. The interim prosthesis was later used as a blueprint for the definitive implant-supported hybrid prosthesis.

  17. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  18. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  19. Interim dentures and treatment dentures.

    PubMed

    Smith, D E

    1984-04-01

    Improvement in the interim denture procedure in the past decade has been one of the significant advancements in prosthodontic practice. The interim denture approach is only slightly more time-consuming and expensive than the conventional immediate denture approach, yet it has many advantages. Among those advantages are the following: (1) allows rapid results; (2) results in a higher quality definitive denture; (3) allows the surgical treatment to be performed during one appointment; (4) permits duplication of the natural tooth position; and (5) provides the patient with a spare denture after the definitive denture is completed. An interim denture technique was described that utilized a flexible layered silicone mold to form the replaced teeth. The interim denture procedure is flexible and lends itself to many variations in technique to meet unusual clinical situations. An interim removable partial denture technique was described that involves block-out of undesirable undercuts and duplication of the master cast for fabrication of the partial denture. This technique results in an interim partial denture that can be placed with little or no adjustment and that will provide better service for those who require it. Three simple procedures for fabricating treatment dentures were described and the indications for each were discussed. Although treatment dentures are not often used, they are essential for the dentist who is treating difficult patients who require complete dentures.

  20. Oleoresin Capsicum toxicology evaluation and hazard review

    SciTech Connect

    Archuleta, M.M.

    1995-10-01

    Oleoresin Capsicum (OC) is an extract of the pepper plant used for centuries as a culinary spice (hot peppers). This material has been identified as a safe and effective Less-Than- Lethal weapon for use by Law enforcement and security professionals against assault. The National Institute of Justice (NIJ) is currently also evaluating its use in conjunction with other Less-Than-Lethal agents such as aqueous foam for use in corrections applications. Therefore, a comprehensive toxicological review of the literature was performed for the National Institute of Justice Less-Than-Lethal Force program to review and update the information available on the toxicity and adverse health effects associated with OC exposure. The results of this evaluation indicate that exposure to OC can result in dermatitis, as well as adverse nasal, pulmonary, and gastrointestinal effects in humans. The primary effects of OC exposure include pain and irritation of the mucous membranes of the eyes, nose, and lining of the mouth. Blistering and rash have been shown to occur after chronic or prolonged dermal exposure. Ingestion of capsicum may cause acute stinging of the lips, tongue, and oral mucosa and may lead to vomiting and diarrhea with large doses. OC vapors may also cause significant pulmonary irritation and prolonged cough. There is no evidence of long term effects associated with an acute exposure to OC, and extensive use as a culinary additive and medicinal ointment has further provided no evidence of long term adverse effects following repeated or prolonged exposure.

  1. Review and evaluation of paleohydrologic methodologies

    SciTech Connect

    Foley, M.G.; Zimmerman, D.A.; Doesburg, J.M.; Thorne, P.D.

    1982-12-01

    A literature review was conducted to identify methodologies that could be used to interpret paleohydrologic environments. Paleohydrology is the study of past hydrologic systems or of the past behavior of an existing hydrologic system. The purpose of the review was to evaluate how well these methodologies could be applied to the siting of low-level radioactive waste facilities. The computer literature search queried five bibliographical data bases containing over five million citations of technical journals, books, conference papers, and reports. Two data-base searches (United States Geological Survey - USGS) and a manual search were also conducted. The methodologies were examined for data requirements and sensitivity limits. Paleohydrologic interpretations are uncertain because of the effects of time on hydrologic and geologic systems and because of the complexity of fluvial systems. Paleoflow determinations appear in many cases to be order-of-magnitude estimates. However, the methodologies identified in this report mitigate this uncertainty when used collectively as well as independently. That is, the data from individual methodologies can be compared or combined to corroborate hydrologic predictions. In this manner, paleohydrologic methodologies are viable tools to assist in evaluating the likely future hydrology of low-level radioactive waste sites.

  2. Evaluation of Cloud Physical Properties of ECMWF Analysis and Re-Analysis (ERA-40 and ERA Interim) against CERES Tropical Deep Convective Cloud Object Observations

    NASA Technical Reports Server (NTRS)

    Xu, Kuan-Man

    2008-01-01

    This study presents an approach that converts the vertical profiles of grid-averaged cloud properties from large-scale models to probability density functions (pdfs) of subgrid-cell cloud physical properties measured at satellite footprints. Cloud physical and radiative properties, rather than just cloud and precipitation occurrences, of assimilated cloud systems by the European Center for Medium-range Weather Forecasts (ECMWF) operational analysis (EOA) and ECMWF Re-Analyses (ERA-40 and ERA Interim) are validated against those obtained from Earth Observing System satellite cloud object data for January-August 1998 and March 2000 periods. These properties include ice water path (IWP), cloud-top height and temperature, cloud optical depth and solar and infrared radiative fluxes. Each cloud object, a contiguous region with similar cloud physical properties, is temporally and spatially matched with EOA and ERA-40 data. Results indicate that most pdfs of EOA and ERA-40 cloud physical and radiative properties agree with those of satellite observations of the tropical deep convective cloud-object type for the January-August 1998 period. There are, however, significant discrepancies in selected ranges of the cloud property pdfs such as the upper range of EOA cloud top height. A major discrepancy is that the dependence of the pdfs on the cloud object size for both EOA and ERA-40 is not as strong as in the observations. Modifications to the cloud parameterization in ECMWF that occurred in October 1999 eliminate the clouds near the tropopause but shift power of the pdf to lower cloud-top heights and greatly reduce the ranges of IWP and cloud optical depth pdfs. These features persist in ERA-40 due to the use of the same cloud parameterizations. The downgrade of data assimilation technique and the lack of snow water content information in ERA-40, not the coarser horizontal grid resolution, are also responsible for the disagreements with observed pdfs of cloud physical

  3. System architecture for the Canadian interim mobile satellite system

    NASA Technical Reports Server (NTRS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-01-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  4. Ocotillo: Improving Learning through Instruction. Interim Report, 1988-89.

    ERIC Educational Resources Information Center

    Jacobs, Alan, Ed.; Walters, Jim, Ed.

    As a result of a Technology Retreat sponsored by the Maricopa Community Colleges (Arizona) in 1988, action/research groups were formed to explore the various challenges of implementing instructional technology effectively. This interim report reviews the work of the groups, with a summary report from each, as follows: (1) "Alternative Funding…

  5. Review of the transport of selected radionuclides in the interim risk assessment for the Radioactive Waste Management Complex, Waste Area Group 7 Operable Unit 7-13/14, Idaho National Engineering and Environmental Laboratory, Idaho

    USGS Publications Warehouse

    Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.

    2005-01-01

    The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.

  6. 42 CFR 121.10 - Reviews, evaluation, and enforcement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.10 Reviews, evaluation, and... reviews and evaluations of member OPOs and transplant programs which the Secretary deems necessary to...) to be a designated transplant program; and (iii) Conducting ongoing and periodic reviews...

  7. 42 CFR 121.10 - Reviews, evaluation, and enforcement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.10 Reviews, evaluation, and... reviews and evaluations of member OPOs and transplant programs which the Secretary deems necessary to...) to be a designated transplant program; and (iii) Conducting ongoing and periodic reviews...

  8. 42 CFR 121.10 - Reviews, evaluation, and enforcement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.10 Reviews, evaluation, and... reviews and evaluations of member OPOs and transplant programs which the Secretary deems necessary to...) to be a designated transplant program; and (iii) Conducting ongoing and periodic reviews...

  9. 42 CFR 121.10 - Reviews, evaluation, and enforcement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.10 Reviews, evaluation, and... reviews and evaluations of member OPOs and transplant programs which the Secretary deems necessary to...) to be a designated transplant program; and (iii) Conducting ongoing and periodic reviews...

  10. 22 CFR 506.5 - Review and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Review and evaluation. 506.5 Section 506.5 Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.5 Review and evaluation. The part-time career employment program will be reviewed through semiannual reports submitted...

  11. 22 CFR 506.5 - Review and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Review and evaluation. 506.5 Section 506.5 Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.5 Review and evaluation. The part-time career employment program will be reviewed through semiannual reports submitted...

  12. 22 CFR 506.5 - Review and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Review and evaluation. 506.5 Section 506.5 Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.5 Review and evaluation. The part-time career employment program will be reviewed through semiannual reports submitted...

  13. 22 CFR 506.5 - Review and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Review and evaluation. 506.5 Section 506.5 Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.5 Review and evaluation. The part-time career employment program will be reviewed through semiannual reports submitted...

  14. 42 CFR 456.122 - Evaluation criteria for admission review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Evaluation criteria for admission review. 456.122...: Review of Need for Admission 1 § 456.122 Evaluation criteria for admission review. The UR plan must provide that— (a) The committee develops written medical care criteria to assess the need for...

  15. 22 CFR 506.5 - Review and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Review and evaluation. 506.5 Section 506.5 Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.5 Review and evaluation. The part-time career employment program will be reviewed through semiannual reports submitted...

  16. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  17. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites: Final report

    SciTech Connect

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs.

  18. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  19. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  20. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  1. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  2. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance...

  3. 20 CFR 801.202 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Interim appointments. 801.202 Section 801.202... Members of the Board § 801.202 Interim appointments. (a) Acting Chairman. In the event that the Chairman... such time as the Secretary of Labor designates an Acting Chairman. (b) Interim members. In the...

  4. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44... § 7.44 Interim relief. (a) When the Department appeals and the case involves removal, separation, or... outcome of the Department appeal. The employee may decline the offer of interim relief. (b) Service...

  5. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes...

  6. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use...

  7. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine...) The Judge will order interim action under paragraph (a) of this section, only after finding that...

  8. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim reports. 908.5 Section 908.5... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a... Administrator, not later than 45 days thereafter, an interim report setting forth as of such date...

  9. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  10. 12 CFR 268.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Interim relief. 268.505 Section 268.505 Banks... REGARDING EQUAL OPPORTUNITY Remedies and Enforcement § 268.505 Interim relief. (a)(1) When the Board appeals... offer of interim relief. (2) Service under the temporary or conditional restoration provisions...

  11. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days following the receipt of the HMO's or CMP's final interim cost and enrollment reports, CMS will make...

  12. 19 CFR 354.8 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim sanctions. 354.8 Section 354.8 Customs... VIOLATION OF AN ANTIDUMPING OR COUNTERVAILING DUTY ADMINISTRATIVE PROTECTIVE ORDER § 354.8 Interim sanctions... a final decision is rendered, that interim sanctions are necessary to protect the interests of...

  13. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim sanctions. 356.18 Section 356.18 Customs... Undertaking § 356.18 Interim sanctions. (a) If the Deputy Under Secretary concludes, after issuing a charging letter under § 356.16 and before a final decision is rendered, that interim sanctions are necessary...

  14. An Interim President Sets the Stage

    ERIC Educational Resources Information Center

    Guardo, Carol J.

    2006-01-01

    An interim president often plays a crucial role in leading a college or university. In some instances, the interim can address and resolve troublesome issues and thus clear the way for the new president to generate progress. In others, the interim stays the course so that the institution maintains its momentum and seizes strategic opportunities to…

  15. 29 CFR 1614.505 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Interim relief. 1614.505 Section 1614.505 Labor Regulations... OPPORTUNITY Remedies and Enforcement § 1614.505 Interim relief. (a)(1) When the agency appeals and the case... interim relief. (2) Service under the temporary or conditional restoration provisions of paragraph...

  16. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  17. 32 CFR 776.82 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Interim suspension. 776.82 Section 776.82... Complaint Processing Procedures § 776.82 Interim suspension. (a) Where the Rules Counsel determines there is... interim suspension, pending completion of a professional responsibility investigation. The...

  18. Prognostic value of interim (18)F-FDG-PET in diffuse large B cell lymphoma treated with rituximab-based immune-chemotherapy: a systematic review and meta-analysis.

    PubMed

    Zhu, Danxia; Xu, Xiao-Li; Fang, Cheng; Ji, Mei; Wu, Jun; Wu, Chang-Ping; Jiang, Jing-Ting

    2015-01-01

    The prognostic value of an interim fluorine-18-fluorodeoxyglucose positron emission tomography ((18)F-FDG PET) for diffuse large B-cell lymphoma (DLBCL) has been assessed by different groups. However, studies have suggested that the use of rituximab could limit the predictive value of interim (18)F-FDG PET for DLBCL. To clarify the prognostic value of interim (18)F-FDG PET in DLBCL patients treated with rituximab based immunochemotherapy, we searched for relevant studies in PubMed, the Cochrane Library and EMBASE. A random versus fixed effects model was applied according to the heterogeneity. According to the literature search strategies, 11 studies were identified. The pooled HR comparing PFS between patients with positive and negative results was 2.96 (95% CI=2.25-3.89). The patients in interim (18)F-FDG PET negative group had a higher CR rates than that in interim (18)F-FDG PET positive group (RR=5.53, 95% CI=2.59-11.80). Consistent evidence favoring interim (18)F-FDG PET-based treatment assessment should be considered in the management of patients with DLBCL.

  19. Study of the Voluntary Public School Choice Program. Interim Report

    ERIC Educational Resources Information Center

    Yin, Robert K.; Ahonen, Pirkko; Kim, Dawn

    2007-01-01

    The purpose of the Voluntary Public School Choice (VPSC) Program is to assist states and local school districts in the development of innovative strategies to expand options for students, and to encourage transfers of students from low-performing to higher-performing schools. This report presents interim findings from the National Evaluation of…

  20. Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey

    ERIC Educational Resources Information Center

    Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.

    2014-01-01

    A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…

  1. Service use and costs for Medicare beneficiaries in risk-based HMOs and CMPs: some interim results from the National Medicare Competition Evaluation.

    PubMed Central

    Rossiter, L F; Nelson, L M; Adamache, K W

    1988-01-01

    The Health Care Financing Administration (HCFA) initiated the Medicare Competition Demonstration in 1982 in anticipation of congressional intent to establish a national program. Interim results on the 1984 service use and cost experience of the health maintenance organizations (HMOs) and competitive medical plans (CMPs) participating in the demonstrations indicate that Medicare enrollees in the demonstration experienced a median of 1,951 hospital days per 1,000 person years, 57 per cent of the median of 3,432 days per 1,000 in the local markets from which the plans drew enrollment. Independent practice association (IPA) HMOs experienced higher hospital use rates than staff and group model HMOs. These comparisons are not adjusted for various risk factors, the absence of which were likely to favor the demonstration plans. Plans with lower hospital service use were federally qualified and had been operating for more than five years. The median total annual revenue per enrollee across all plans was $2,312, compared to median annual expenses per enrollee of $2,250. The distribution of median annual expenses per enrollee by major category of expense was: institutional expenses ($1,038/enrollee), medical expenses ($720/enrollee), supplemental services expenses ($154/enrollee), and administrative and other expenses ($295/enrollee). Future analysis, using beneficiary-level data, will examine the impact of the demonstration and the nature and extent of evident biased selection and will compare the quality of care in the demonstrations to that in the fee-for-service sector. PMID:3291622

  2. Revocation of Office of Generic Drug's interim policy statement on inactive ingredients. Food and Drug Administration, HHS. Notice.

    PubMed

    1999-04-30

    The Food and Drug Administration (FDA) is revoking an interim policy statement on inactive ingredients in parenteral, ophthalmic, otic, and topical generic drug products (Interim Inactive Ingredient Policy). These generic drug products are the subjects of abbreviated new drug applications (ANDA's). The Interim Inactive Ingredient Policy was issued as a memorandum from the Acting Director of the Center for Drug Evaluation and Research's (CDER's) Office of Generic Drugs, FDA, to CDER's Associate Director for Science and Medical Affairs, FDA. FDA is taking this action because the Interim Inactive Ingredient Policy no longer represents current agency policy.

  3. Data breaches. Interim final rule.

    PubMed

    2007-06-22

    This document establishes regulations to address data breaches regarding sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). The regulations implement certain provisions of Title IX of the Veterans Benefits, Health Care, and Information Technology Act of 2006, which require promulgation of these regulations as an interim final rule.

  4. Project Canada West. Interim Report.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    This first interim report of project Canada West, initiated in April, 1970, includes three papers. "Curriculum Development in Urbanization," by Dr. R. H. Sabey, Acting Executive Director, is an overview of the Project's history, purpose, and the 5 year plan for phases of research development. (See SO 000 283 for complete abstract.) Two…

  5. OECD Reviews of Evaluation and Assessment in Education: Australia

    ERIC Educational Resources Information Center

    Santiago, Paulo; Donaldson, Graham; Herman, Joan; Shewbridge, Claire

    2011-01-01

    This report for Australia forms part of the Organisation for Economic Cooperation and Development (OECD) Review on Evaluation and Assessment Frameworks for Improving School Outcomes. The purpose of the Review is to explore how systems of evaluation and assessment can be used to improve the quality, equity and efficiency of school education. The…

  6. 38 CFR 1.895 - Review and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Review and evaluation. 1.895 Section 1.895 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS GENERAL PROVISIONS Part-Time Career Employment Program § 1.895 Review and evaluation. The part-time career...

  7. 38 CFR 1.895 - Review and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Review and evaluation. 1.895 Section 1.895 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS GENERAL PROVISIONS Part-Time Career Employment Program § 1.895 Review and evaluation. The part-time career...

  8. 38 CFR 1.895 - Review and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Review and evaluation. 1.895 Section 1.895 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS GENERAL PROVISIONS Part-Time Career Employment Program § 1.895 Review and evaluation. The part-time career...

  9. 41 CFR 101-29.204 - Interim Federal specification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal... PRODUCT DESCRIPTIONS 29.2-Definitions § 101-29.204 Interim Federal specification. An interim Federal... agencies. Interim amendments to Federal Specifications and amendments to interim Federal specifications...

  10. From Testing to Teaching: The Use of Interim Assessments in Classroom Instruction. CPRE Research Report # RR-65

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…

  11. Immobilized High Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report 2nd Generation Implementing Architecture

    SciTech Connect

    CALMUS, R.B.

    2000-09-14

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document.

  12. Interim prediction method for jet noise

    NASA Technical Reports Server (NTRS)

    Stone, J. R.

    1974-01-01

    A method is provided for predicting jet noise for a wide range of nozzle geometries and operating conditions of interest for aircraft engines. Jet noise theory, data and existing prediction methods was reviewed, and based on this information a interim method of jet noise prediction is proposed. Problem areas are idenified where further research is needed to improve the prediction method. This method predicts only the noise generated by the exhaust jets mixing with the surrounding air and does not include other noises emanating from the engine exhaust, such as combustion and machinery noise generated inside the engine (i.e., core noise). It does, however, include thrust reverser noise. Prediction relations are provided for conical nozzles, plug nozzles, coaxial nozzles and slot nozzles.

  13. Interim Guidance on the Treatment of Condensable Particulate Matter Test Results in the Prevention of Significant Deterioration and Nonattainment New Source Review Permitting Programs

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. High-Resolution Dynamical Downscaling of ERA-Interim Using the WRF Regional Climate Model for the Area of Poland. Part 1: Model Configuration and Statistical Evaluation for the 1981-2010 Period

    NASA Astrophysics Data System (ADS)

    Kryza, Maciej; Wałaszek, Kinga; Ojrzyńska, Hanna; Szymanowski, Mariusz; Werner, Małgorzata; Dore, Anthony J.

    2017-02-01

    In this work, we present the results of high-resolution dynamical downscaling of air temperature, relative humidity, wind speed and direction, for the area of Poland, with the Weather Research and Forecasting (WRF) model. The model is configured using three nested domains, with spatial resolution of 45 km × 45 km, 15 km × 15 km and 5 km × 5 km. The ERA-Interim database is used for boundary conditions. The results are evaluated by comparison with station measurements for the period 1981-2010. The model is capable of reproducing the main climatological features of the study area. The results are in very close agreement with the measurements, especially for the air temperature. For all four meteorological variables, the model performance captures seasonal and daily cycles. For the air temperature and winter season, the model underestimates the measurements. For summer, the model shows higher values, compared with the measurements. The opposite is the case for relative humidity. There is a strong diurnal pattern in mean error, which changes seasonally. The agreement with the measurements is worse for the seashore and mountain areas, which suggests that the 5 km × 5 km grid might still have an insufficient spatial resolution. There is no statistically significant temporal trend in the model performance. The larger year-to-year changes in the model performance, e.g. for the years 1982 and 2010 for the air temperature should therefore be linked with the natural variability of meteorological conditions.

  15. Interim Continuing Resolutions (CRs): Potential Impacts on Agency Operations

    DTIC Science & Technology

    2010-11-19

    Brookings Review, vol. 6 (summer 1988), p . 30. GAO also has discussed how incentives for policymakers “to negotiate seriously and reach agreement” may be...the Budget Enforcement Act, GAO-01-991T, July 19, 2001, p . 12. For further analysis, see CRS Report RL30339, Preventing Federal Government Shutdowns...05, p . 4 (attachment, Section 6). OMB might apportion funds at, essentially, greater than a daily rate, as the period of time covered by an interim

  16. Applying complexity theory: a review to inform evaluation design.

    PubMed

    Walton, Mat

    2014-08-01

    Complexity theory has increasingly been discussed and applied within evaluation literature over the past decade. This article reviews the discussion and use of complexity theory within academic journal literature. The aim is to identify the issues to be considered when applying complexity theory to evaluation. Reviewing 46 articles, two groups of themes are identified. The first group considers implications of applying complexity theory concepts for defining evaluation purpose, scope and units of analysis. The second group of themes consider methodology and method. Results provide a starting point for a configuration of an evaluation approach consistent with complexity theory, whilst also identifying a number of design considerations to be resolved within evaluation planning.

  17. Job and Work Evaluation: A Literature Review.

    ERIC Educational Resources Information Center

    Heneman, Robert L.

    2003-01-01

    Describes advantages and disadvantages of work evaluation methods: ranking, market pricing, banding, classification, single-factor, competency, point-factor, and factor comparison. Compares work evaluation perspectives: traditional, realist, market advocate, strategist, organizational development, social reality, contingency theory, competency,…

  18. Review of NASA's Exploration Technology Development Program: An Interim Report. [ISBN 0-309-11944-8 (place in D020A)

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA requested that a committee under the auspices of the National Research Council's Aeronautics and Space Engineering Board carry out an assessment of NASA's Exploration Technology Development Program (ETDP). Organizationally, this program functions under the direction of NASA's Exploration Systems Mission Directorate and is charged with developing new technologies that will enable NASA to conduct future human and robotic exploration missions, while reducing mission risk and cost. The Committee to Review NASA's Exploration Technology Development Program has been tasked to examine how well the program is aligned with the stated objectives of the President's Vision for Space Exploration (VSE), to identify gaps in the program, and to assess the quality of the research. The full statement of task is given in Appendix A. The committee consists of 25 members and includes a cross section of senior executives, engineers, researchers, and other aerospace professionals drawn from industry, universities, and government agencies with expertise in virtually all the technical fields represented within the program.

  19. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  20. Interim performance criteria for photovoltaic energy systems. [Glossary included

    SciTech Connect

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  1. Database and Interim Glass Property Models for Hanford HLW Glasses

    SciTech Connect

    Hrma, Pavel R.; Piepel, Gregory F.; Vienna, John D.; Cooley, Scott K.; Kim, Dong-Sang; Russell, Renee L.

    2001-07-24

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region.

  2. Comparison of conditional bias-adjusted estimators for interim analysis in clinical trials with survival data.

    PubMed

    Shimura, Masashi; Gosho, Masahiko; Hirakawa, Akihiro

    2017-02-17

    Group sequential designs are widely used in clinical trials to determine whether a trial should be terminated early. In such trials, maximum likelihood estimates are often used to describe the difference in efficacy between the experimental and reference treatments; however, these are well known for displaying conditional and unconditional biases. Established bias-adjusted estimators include the conditional mean-adjusted estimator (CMAE), conditional median unbiased estimator, conditional uniformly minimum variance unbiased estimator (CUMVUE), and weighted estimator. However, their performances have been inadequately investigated. In this study, we review the characteristics of these bias-adjusted estimators and compare their conditional bias, overall bias, and conditional mean-squared errors in clinical trials with survival endpoints through simulation studies. The coverage probabilities of the confidence intervals for the four estimators are also evaluated. We find that the CMAE reduced conditional bias and showed relatively small conditional mean-squared errors when the trials terminated at the interim analysis. The conditional coverage probability of the conditional median unbiased estimator was well below the nominal value. In trials that did not terminate early, the CUMVUE performed with less bias and an acceptable conditional coverage probability than was observed for the other estimators. In conclusion, when planning an interim analysis, we recommend using the CUMVUE for trials that do not terminate early and the CMAE for those that terminate early. Copyright © 2017 John Wiley & Sons, Ltd.

  3. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  4. 45 CFR 1176.6 - Review and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Review and evaluation. 1176.6 Section 1176.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES PART-TIME CAREER EMPLOYMENT § 1176.6 Review and...

  5. Evaluating Sleep Disturbance: A Review of Methods

    NASA Technical Reports Server (NTRS)

    Smith, Roy M.; Oyung, R.; Gregory, K.; Miller, D.; Rosekind, M.; Rosekind, Mark R. (Technical Monitor)

    1996-01-01

    There are three general approaches to evaluating sleep disturbance in regards to noise: subjective, behavioral, and physiological. Subjective methods range from standardized questionnaires and scales to self-report measures designed for specific research questions. There are two behavioral methods that provide useful sleep disturbance data. One behavioral method is actigraphy, a motion detector that provides an empirical estimate of sleep quantity and quality. An actigraph, worn on the non-dominant wrist, provides a 24-hr estimate of the rest/activity cycle. The other method involves a behavioral response, either to a specific probe or stimuli or subject initiated (e.g., indicating wakefulness). The classic, gold standard for evaluating sleep disturbance is continuous physiological monitoring of brain, eye, and muscle activity. This allows detailed distinctions of the states and stages of sleep, awakenings, and sleep continuity. Physiological delta can be obtained in controlled laboratory settings and in natural environments. Current ambulatory physiological recording equipment allows evaluation in home and work settings. These approaches will be described and the relative strengths and limitations of each method will be discussed.

  6. The token economy: an evaluative review1

    PubMed Central

    Kazdin, Alan E.; Bootzin, Richard R.

    1972-01-01

    Token economies have been applied in a wide range of settings. While there are several advantages to the use of this procedure, there are obstacles that may impede its implementation and therapeutic efficacy. These include: staff training, client resistance, circumvention of the contingencies, and non-responsiveness of subjects. Studies employing token programs with psychiatric patients, retardates, children in classroom settings, delinquents, and autistic children are reviewed. Although token economies are successful while in operation, the issue of generalization of behavior gains or resistance to extinction has not been given careful consideration. Inasmuch as generalization is perhaps the most crucial issue, several procedures are presented that are designed to facilitate maintenance of performance when reinforcement is withdrawn. Methodological suggestions for investigations on token reinforcement in applied settings are presented. PMID:16795358

  7. The token economy: an evaluative review.

    PubMed

    Kazdin, A E; Bootzin, R R

    1972-01-01

    Token economies have been applied in a wide range of settings. While there are several advantages to the use of this procedure, there are obstacles that may impede its implementation and therapeutic efficacy. These include: staff training, client resistance, circumvention of the contingencies, and non-responsiveness of subjects. Studies employing token programs with psychiatric patients, retardates, children in classroom settings, delinquents, and autistic children are reviewed. Although token economies are successful while in operation, the issue of generalization of behavior gains or resistance to extinction has not been given careful consideration. Inasmuch as generalization is perhaps the most crucial issue, several procedures are presented that are designed to facilitate maintenance of performance when reinforcement is withdrawn. Methodological suggestions for investigations on token reinforcement in applied settings are presented.

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  11. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  12. 40 CFR 94.12 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Interim provisions. 94.12 Section 94.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains...

  13. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  14. 40 CFR 1042.145 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Interim provisions. 1042.145 Section... Standards and Related Requirements § 1042.145 Interim provisions. (a) General. The provisions in this section apply instead of other provisions in this part. This section describes when these...

  15. 39 CFR 952.6 - Interim impounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim impounding. 952.6 Section 952.6 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.6 Interim impounding. In preparation for or during the pendency of...

  16. Locating Interim Assessments within Teachers' Assessment Practice

    ERIC Educational Resources Information Center

    Riggan, Matthew; Olah, Leslie Nabors

    2011-01-01

    Promising research on the teaching and learning impact of classroom-embedded formative assessment has spawned interest in a broader array of assessment tools and practices, including interim assessment. Although researchers have begun to explore the impact of interim assessments in the classroom, like other assessment tools and practices, they…

  17. 20 CFR 410.234 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Interim provisions. 410.234 Section 410.234 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, TITLE IV... Evidence § 410.234 Interim provisions. (a) Notwithstanding any other provision of this subpart, a...

  18. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  19. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  20. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  1. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  2. Interim FDG-PET in Hodgkin lymphoma: a compass for a safe navigation in clinical trials?

    PubMed

    Gallamini, Andrea; Kostakoglu, Lale

    2012-12-13

    Despite the rewarding results achieved in the treatment of Hodgkin lymphoma (HL), concerns have been raised regarding the long-term complications induced by therapy. Hence, the current challenge is to develop a new therapeutic strategy maintaining excellent patient outcome while reducing potentially life-threatening late adverse effects. Therefore, it would be beneficial to identify chemoresistant or refractory patients early during therapy for appropriate and timely escalation of treatment. Recently, compelling data have emerged on the prognostic role of interim [18F]-fluoro-2-deoxy-D-glucose positron emission tomography (FDG-PET) performed early during the course of treatment to predict ultimate outcome, even proving superior to conventional prognostic factors. Several ongoing prospective trials are exploring the feasibility of treatment de-escalation strategies in patients with a negative interim PET, as well as therapy escalation in advanced-stage HL patients who have a positive interim PET result. In this article, the published reports on the contribution of interim PET to the design of ongoing response-adapted clinical trials are reviewed. Moreover, some of the unresolved issues revolving around the suboptimal positive predictive value of interim PET are addressed with an emphasis on the interpretation criteria. A final remark on the appropriate use of interim PET is also provided.

  3. 20 CFR 638.811 - Review and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Review and evaluation. 638.811 Section 638.811 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM... evaluation. The Job Corps Director shall establish adequate program management to provide...

  4. Children's Program Outcome Review Team: 1999 Evaluation Results.

    ERIC Educational Resources Information Center

    Wade, Patricia C.

    In its sixth year of evaluating children's services, the Children's Program Outcome Review Team (C-PORT), under the direction of the Tennessee Commission on Children and Youth, continued to collect and analyze data to improve implementation of service delivery to 11,800 children and families involved in state custody. The C-PORT evaluation for…

  5. Peer Reviewers' Dilemmas: Values Antinomies when Evaluating Higher Education Institutions

    ERIC Educational Resources Information Center

    Patry, Jean-Luc; Gastager, Angela

    2012-01-01

    Whenever evaluations are done, there are antinomies of interests both within and between stakeholders. To account for such antinomies, taxonomy has been developed which will be presented and discussed using the peer review processes in university evaluations as example. The taxonomy contains four dimensions: a) seven values domains are…

  6. Aqueous foam toxicology evaluation and hazard review

    SciTech Connect

    Archuleta, M.M.

    1995-10-01

    Aqueous foams are aggregates of bubbles mechanically generated by passing air or other gases through a net, screen, or other porous medium that is wetted by an aqueous solution of surface-active foaming agents (surfactants). Aqueous foams are important in modem fire-fighting technology, as well as for military uses for area denial and riot or crowd control. An aqueous foam is currently being developed and evaluated by Sandia National Laboratories (SNL) as a Less-Than-Lethal Weapon for the National Institute of Justice (NIJ). The purpose of this study is to evaluate the toxicity of the aqueous foam developed for the NIJ and to determine whether there are any significant adverse health effects associated with completely immersing individuals without protective equipment in the foam. The toxicity of the aqueous foam formulation developed for NIJ is determined by evaluating the toxicity of the individual components of the foam. The foam is made from a 2--5% solution of Steol CA-330 surfactant in water generated at expansion ratios ranging from 500:1 to 1000:1. SteoI CA-330 is a 35% ammonium laureth sulfate in water and is produced by Stepan Chemical Company and containing trace amounts (<0.1%) of 1,4-dioxane. The results of this study indicate that Steol CA-330 is a non-toxic, mildly irritating, surfactant that is used extensively in the cosmetics industry for hair care and bath products. Inhalation or dermal exposure to this material in aqueous foam is not expected to produce significant irritation or systemic toxicity to exposed individuals, even after prolonged exposure. The amount of 1,4-dioxane in the surfactant, and subsequently in the foam, is negligible and therefore, the toxicity associated with dioxane exposure is not significant. In general, immersion in similar aqueous foams has not resulted in acute, immediately life-threatening effects, or chronic, long-term, non-reversible effects following exposure.

  7. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  8. Vet Centers. Interim final rule.

    PubMed

    2015-08-04

    The Department of Veterans Affairs (VA) is amending its medical regulation that governs Vet Center services. The National Defense Authorization Act for Fiscal Year 2013 (the 2013 Act) requires Vet Centers to provide readjustment counseling services to broader groups of veterans, members of the Armed Forces, including a member of a reserve component of the Armed Forces, and family members of such veterans and members. This interim final rule amends regulatory criteria to conform to the 2013 Act, to include new and revised definitions.

  9. Predictive Significance of a New Prognostic Score for Patients With Diffuse Large B-Cell Lymphoma in the Interim-Positron Emission Tomography Findings.

    PubMed

    Kong, Yu; Qu, Lili; Li, Yuekai; Liu, Dai; Lv, Xuemin; Han, Jiankui

    2016-02-01

    We hypothesized that the objective treatment response of patients with diffuse large B-cell lymphoma (DLBCL) was affected by many factors such as pathophysiological, biological, and pharmaceutical mechanisms. This retrospective study aimed to evaluate the predictive significance of clinical prognostic factors and interim fluorine-18-fluorodeoxyglucose (F-FDG) positron emission tomography/computed tomography (PET/CT), and to find a new prognostic predictor significantly associated with DLBCL patients' outcome. A total of 105 adult patients with DLBCL were reviewed. Each patient underwent an interim F-FDG PET/CT scan after the second chemotherapy cycle. The visual method based on the Deauville 5-point scale was used to evaluate the interim-PET/CT scans. The relationships among the prognostic factors, the 3-year progression-free survival (PFS) rate and overall survival (OS) rate were analyzed with Kaplan-Meier plots. The predictive value of the newly constructed prognostic score was analyzed with multivariate analysis (Cox proportional hazard regression model). The visual analysis showed statistically significant differences in both PFS and OS between the patients with a negative interim-PET/CT and those with a positive interim-PET/CT. Advanced age, advanced stage, and DLBCL subtype were also significantly associated with outcome. A new prognostic score that composed of the above 4 factors was obtained. New prognostic score stratified patients into 4 risk groups with 3-year PFS of 98.5%, 73.9%, 11.1%, and 0%, and 3-year OS of 100%, 91.3%, 55.6%, and 0% (P < 0.001 for PFS and OS). Multivariate analysis showed that the new prognostic score had the greatest ability to predict relapse (P < 0.001) and death (P < 0.001). In DLBCL patients, interim F-FDG PET/CT can provide significant independent prognostic information. Our work illustrates that the new prognostic score has the strongest potential for accurately prognostication, for stratification in clinical

  10. Space Communications Capability Roadmap Interim Review

    NASA Technical Reports Server (NTRS)

    Spearing, Robert; Regan, Michael

    2005-01-01

    Contents include the following: Identify the need for a robust communications and navigation architecture for the success of exploration and science missions. Describe an approach for specifying architecture alternatives and analyzing them. Establish a top level architecture based on a network of networks. Identify key enabling technologies. Synthesize capability, architecture and technology into an initial capability roadmap.

  11. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Termination of interim status. 270.73... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.73 Termination of interim status. Interim status terminates when: (a) Final administrative disposition of...

  12. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is... after the attachment of the insurance under the interim binder to which such valuation...

  13. 40 CFR 270.71 - Operation during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Operation during interim status. 270... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.71 Operation during interim status. (a) During the interim status period the facility shall not: (1)...

  14. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Interim final rule. 106.35 Section 106.35... PHMSA Rulemaking Documents § 106.35 Interim final rule. An interim final rule is issued without first... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause,...

  15. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source...

  16. 33 CFR 1.05-45 - Interim rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim rule. 1.05-45 Section 1... PROVISIONS Rulemaking § 1.05-45 Interim rule. (a) An interim rule may be issued when it is in the public... example, an interim rule may be issued in instances when normal procedures for notice and comment prior...

  17. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    SciTech Connect

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  18. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  19. A core-item reviewer evaluation (CoRE) system for manuscript peer review.

    PubMed

    Onitilo, Adedayo A; Engel, Jessica M; Salzman-Scott, Sherry A; Stankowski, Rachel V; Doi, Suhail A R

    2014-01-01

    Manuscript peer review is essential for ensuring accountability to all involved in the publication process, including authors, journals, and readers. Lack of consensus regarding what constitutes an accountable manuscript peer review process has resulted in varying practices from one journal to the next. Currently, reviewers are asked to make global judgments about various aspects of a paper for review irrespective of whether guided by a review checklist or not, and several studies have documented gross disagreement between reviewers of the same manuscript. We have previously proposed that the solution may be to direct reviewers to concrete items that do not require global judgments but rather provide a specific choice, along with referee justification for such choices. This study evaluated use of such a system via an international survey of health care professionals who had recently reviewed a health care--related manuscript. Results suggest that use of such a peer review system by reviewers does indeed improve interreviewer agreement, and thus, has the potential to support more consistent and effective peer review, if introduced into journal processes for peer review.

  20. Development of analytical tools for evaluating operations of light rail at grade within an urban signal system. Interim report 3. Research report, September 1991-August 1994

    SciTech Connect

    Berry, R.A.; Walters, C.H.

    1994-11-01

    This report identifies and recommends measures of impact that are applicable to the operation of at-grade light rail crossings within traffic signal systems. The key point in identifying measures of impact is to maintain consistency with traffic signal measures of impacts. The recommended measures of impact include average delay and queue length. The report illustrates how the analyst can apply both manual calculation methods and computer models to estimate these measures of impact. Included in the discussion is a screening procedure that is desinged to minimize total work effort by identifying impacts and mitigating them with the least intensive analysis method. However, if the analysis results are marginal, then full simulation of the traffic signal system including the light rail line is warranted. The recommended programs for such evaluation are TRANSYT-7F for simpler problems and Traf-NETSIM for complex problems and analysis of system variances.

  1. Review of ride quality technology needs of industry and user groups

    NASA Technical Reports Server (NTRS)

    Mckenzie, J. R.; Brumaghim, S. H.

    1975-01-01

    A broad survey of ride quality technology state-of-the-art and a review of user evaluation of this technology were conducted. During the study 17 users of ride quality technology in 10 organizations representing land, marine and air passenger transportation modes were interviewed. Interim results and conclusions of this effort are reported.

  2. Evaluation of the deposition, translocation and pathological response of brake dust with and without added chrysotile in comparison to crocidolite asbestos following short-term inhalation: Interim results

    SciTech Connect

    Bernstein, David M.; Rogers, Rick; Sepulveda, Rosalina; Kunzendorf, Peter; Bellmann, Bernd; Ernst, Heinrich; Phillips, James I.

    2014-04-01

    Chrysotile has been frequently used in the past in manufacturing brakes and continues to be used in brakes in many countries. This study was designed to provide an understanding of the biokinetics and potential toxicology following inhalation of brake dust following short term exposure in rats. The deposition, translocation and pathological response of brake dust derived from brake pads manufactured with chrysotile were evaluated in comparison to the amphibole, crocidolite asbestos. Rats were exposed by inhalation 6 h/day for 5 days to either brake dust obtained by sanding of brake-drums manufactured with chrysotile, a mixture of chrysotile and the brake dust or crocidolite asbestos. No significant pathological response was observed at any time point in either the brake dust or chrysotile/brake dust exposure groups. The long chrysotile fibers (> 20 μm) cleared quickly with T{sub 1/2} estimated as 30 and 33 days, respectively in the brake dust and the chrysotile/brake dust exposure groups. In contrast, the long crocidolite fibers had a T{sub 1/2} > 1000 days and initiated a rapid inflammatory response in the lung following exposure resulting in a 5-fold increase in fibrotic response within 91 days. These results provide support that brake dust derived from chrysotile containing brake drums would not initiate a pathological response in the lung following short term inhalation. - Highlights: • We evaluated brake dust w/wo added chrysotile in comparison to crocidolite asbestos. • Persistence, translocation, pathological response in the lung and pleural cavity. • Chrysotile cleared rapidly from the lung while the crocidolite asbestos persisted. • No significant pathology observed at any time point in the brake-dust groups. • Crocidolite produced pathological response - Wagner 4 interstitial fibrosis by 32d.

  3. Houston-harte of San Angelo: A case study application of a full-cost model for evaluating urban passenger transportation. Interim research report

    SciTech Connect

    Smith, K.M.; Qin, J.; Weissmann, J.; Euritt, M.A.; Martello, M.T.

    1996-04-01

    This report evaluates the full costs of transportation alternatives on the Houston-Harte Corridor in San Angelo, Texas. The alternatives examined include those considered by the San Angelo District of the Texas Department of Transportation, which are: (1) the continuation of the existing frontage lanes-only configuration and (2) the construction of the mainlanes for completion of the facility. In addition, this study considers each of the above alternatives with transit service along the corridor, resulting in the third and fourth scenarios. The results of MODECOST - a computer model developed by a Center for Transportation Research (CTR) team -- indicate that the addition of mainlanes to the Houston-Harte Corridor is both feasible and cost effective. The case studies conducted as part of this project show that, in many cases, the costs borne by users are equally or more significant than the facility cost in determining the cost implications of various transportation alternatives. The external costs, depending on the volumes of traffic expected along the corridor, may also be substantial. Demonstrating this complex relationship, this case study showed that the capital-intensive Houston-Harte project was, over time, more cost effective than no facility. This study also shows that full-cost analysis is an effective tool for comparing transportation alternatives. Full-cost analysis provides a value for each alternative that may be used as an assessment indicator to policy-makers and transportation professionals.

  4. Evaluation of the deposition, translocation and pathological response of brake dust with and without added chrysotile in comparison to crocidolite asbestos following short-term inhalation: interim results.

    PubMed

    Bernstein, David M; Rogers, Rick; Sepulveda, Rosalina; Kunzendorf, Peter; Bellmann, Bernd; Ernst, Heinrich; Phillips, James I

    2014-04-01

    Chrysotile has been frequently used in the past in manufacturing brakes and continues to be used in brakes in many countries. This study was designed to provide an understanding of the biokinetics and potential toxicology following inhalation of brake dust following short term exposure in rats. The deposition, translocation and pathological response of brake dust derived from brake pads manufactured with chrysotile were evaluated in comparison to the amphibole, crocidolite asbestos. Rats were exposed by inhalation 6 h/day for 5 days to either brake dust obtained by sanding of brake-drums manufactured with chrysotile, a mixture of chrysotile and the brake dust or crocidolite asbestos. No significant pathological response was observed at any time point in either the brake dust or chrysotile/brake dust exposure groups. The long chrysotile fibers (>20 μm) cleared quickly with T(½) estimated as 30 and 33 days, respectively in the brake dust and the chrysotile/brake dust exposure groups. In contrast, the long crocidolite fibers had a T(½)>1000 days and initiated a rapid inflammatory response in the lung following exposure resulting in a 5-fold increase in fibrotic response within 91 days. These results provide support that brake dust derived from chrysotile containing brake drums would not initiate a pathological response in the lung following short term inhalation.

  5. Evaluating participation in water resource management: A review

    NASA Astrophysics Data System (ADS)

    Carr, G.; BlöSchl, G.; Loucks, D. P.

    2012-11-01

    Key documents such as the European Water Framework Directive and the U.S. Clean Water Act state that public and stakeholder participation in water resource management is required. Participation aims to enhance resource management and involve individuals and groups in a democratic way. Evaluation of participatory programs and projects is necessary to assess whether these objectives are being achieved and to identify how participatory programs and projects can be improved. The different methods of evaluation can be classified into three groups: (i) process evaluation assesses the quality of participation process, for example, whether it is legitimate and promotes equal power between participants, (ii) intermediary outcome evaluation assesses the achievement of mainly nontangible outcomes, such as trust and communication, as well as short- to medium-term tangible outcomes, such as agreements and institutional change, and (iii) resource management outcome evaluation assesses the achievement of changes in resource management, such as water quality improvements. Process evaluation forms a major component of the literature but can rarely indicate whether a participation program improves water resource management. Resource management outcome evaluation is challenging because resource changes often emerge beyond the typical period covered by the evaluation and because changes cannot always be clearly related to participation activities. Intermediary outcome evaluation has been given less attention than process evaluation but can identify some real achievements and side benefits that emerge through participation. This review suggests that intermediary outcome evaluation should play a more important role in evaluating participation in water resource management.

  6. An interim evaluation of the thermal stability of Cu--Y--/sup 85/Kr sputter deposits and plans for evantual disposal

    SciTech Connect

    McClanahan, E.D.; Bradley, E.R.

    1988-04-01

    A pilot process was developed and demonstrated for trapping and storing /sup 85/Kr from the dissolver off-gas stream of a nuclear fuel reprocessing plant. Ions produced in a low-pressure krypton discharge are implanted on the inner wall of a krypton trapping storage device (KTSD). Objectives were to measure the release of /sup 85/Kr implanted in a copper--yttrium alloy, outline the characterization work to be performed on the Cu/endash/Y/endash//sup 85/Kr waste form, and identify the options available for disposing of the remaining /sup 85/Kr. Release rates were obtained from periodic measurements of the krypton released from both radioactive and nonradioactive krypton-loaded KTSDs. Sampling is expected to continue as long as the extrapolated release rates remain acceptable for a period not to exceed one half-life (/approximately/10 y). Seven tests were performed on a nonradioactive KTSD at 180 to 450/degree/C. Three KTSDs loaded with 80 to 150 Ci of /sup 85/Kr stored at 150, 250, and 350/degree/C were sampled four times each. Proposed post-elevated-temperature storage characterization of the Cu/endash/Y/endash//sup 85/Kr waste form is outlined. Both radioactive and nonradioactive test specimens stored below 350/degree/C showed release rates less than 0.1%y/sup /minus/1/. Release rates for the radioactive specimens were obtained for storage periods of 1.6, 1.1, and 0.4 y at 150, 250 and 350/degree/C. The nonradioactive specimen has been held at temperatures between 180 and 450/degree/C, but mainly at 350/degree/C for a total storage time of 2.1 y. Tests should continue for a period not exceeding 10 y, and then the remaining Cu/endash/Y/endash//sup 85/Kr waste form should be evaluated to better predict the overall stability. Three options for the disposal of the remaining /sup 85/Kr. 3 refs., 2 figs., 2 tabs.

  7. Reviewing Reliability and Validity of Information for University Educational Evaluation

    NASA Astrophysics Data System (ADS)

    Otsuka, Yusaku

    To better utilize evaluations in higher education, it is necessary to share the methods of reviewing reliability and validity of examination scores and grades, and to accumulate and share data for confirming results. Before the GPA system is first introduced into a university or college, the reliability of examination scores and grades, especially for essay examinations, must be assured. Validity is a complicated concept, so should be assured in various ways, including using professional audits, theoretical models, and statistical data analysis. Because individual students and teachers are continually improving, using evaluations to appraise their progress is not always compatible with using evaluations in appraising the implementation of accountability in various departments or the university overall. To better utilize evaluations and improve higher education, evaluations should be integrated into the current system by sharing the vision of an academic learning community and promoting interaction between students and teachers based on sufficiently reliable and validated evaluation tools.

  8. 44 CFR 352.7 - Review and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Review and evaluation. 352.7 Section 352.7 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS...

  9. 44 CFR 352.7 - Review and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Review and evaluation. 352.7 Section 352.7 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS...

  10. Evaluating Career Education: A Review and Model. Report No. 39.

    ERIC Educational Resources Information Center

    Tuckman, Bruce W.; Carducci, Joseph A.

    After an extensive review of the literature concerned with evaluating career objectives, a literature with little cohesion, six areas were isolated as crucial indices of the adequacy of career education. These areas are: (1) self-awareness, (2) career-awareness, (3) decision-making skills, (4) overall school behavior, (5) career competencies, and…

  11. "Policing Schools" Strategies: A Review of the Evaluation Evidence

    ERIC Educational Resources Information Center

    Petrosino, Anthony; Guckenburg, Sarah; Fronius, Trevor

    2012-01-01

    Background: Schools experience a wide range of crime and disorder, victimizing students and staff, and undermining attempts to create a safe and orderly environment for student learning. Police have long established programs with schools, but there has been no systematic review of evaluations of these programs, outside of police-led prevention…

  12. 42 CFR 121.10 - Reviews, evaluation, and enforcement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 121.10 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.10 Reviews, evaluation, and... carry out her/his responsibilities under the Public Health Service Act and the Social Security Act....

  13. Software Selection, Evaluation and Organization [and] Software Reviews. Article Reprints.

    ERIC Educational Resources Information Center

    Computing Teacher, 1985

    1985-01-01

    This collection of reprints from The Computing Teacher contains 11 articles on the selection, evaluation, and organization of software published between August 1983 and March 1986, as well as more than 20 reviews of educational software packages published between December 1982 and June 1986. The articles are: (1) "The New Wave of Educational…

  14. PROGRAM EVALUATION AND REVIEW TECHNIQUE--APPLICATIONS IN EDUCATION.

    ERIC Educational Resources Information Center

    COOK, DESMOND L.

    THIS MONOGRAPH IS INTENDED TO DISSEMINATE TO THE EDUCATIONAL COMMUNITY THE BASIC CONCEPTS AND PRINCIPLES OF A RECENTLY DEVELOPED PROJECT MANAGEMENT INFORMATION SYSTEM ENTITLED PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT). PERT IS A METHODOLOGY FOR PLANNING THE DIVERSE ACTIVITIES IN EITHER LARGE OR SMALL PROJECTS. STEPS OF THE PERT TECHNIQUE…

  15. Peer Review and Evaluation of the Intellectual Work of Teaching

    ERIC Educational Resources Information Center

    Bernstein, Daniel J.

    2008-01-01

    Institutional surveys of student opinion emerged out of the turmoil of the late 1960s. Never intended to serve as professional evaluations, the surveys were the only tangible evidence of teaching effectiveness until some faculty opened their classrooms for observation by chairs and colleagues. Historically, the "peer review of teaching" has…

  16. Concluding Thoughts: Observing, Promoting, Evaluating, and Reviewing Research Performance.

    ERIC Educational Resources Information Center

    Creswell, John W.

    1986-01-01

    When institutional personnel assess faculty research performance, they should consider the extent to which the institution rewards research, ways to encourage faculty to be productive, criteria for evaluating research performance, and the specific steps useful in reviewing research performance within academic units. (Author/MSE)

  17. 44 CFR 152.5 - Review process and evaluation criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Review process and evaluation criteria. 152.5 Section 152.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL ASSISTANCE TO FIREFIGHTERS GRANT PROGRAM §...

  18. WINCADRE INORGANIC (WINDOWS COMPUTER-AIDED DATA REVIEW AND EVALUATION)

    EPA Science Inventory

    WinCADRE (Computer-Aided Data Review and Evaluation) is a Windows -based program designed for computer-assisted data validation. WinCADRE is a powerful tool which significantly decreases data validation turnaround time. The electronic-data-deliverable format has been designed in...

  19. 7 CFR 227.31 - Audits, management reviews, and evaluations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Audits, management reviews, and evaluations. 227.31 Section 227.31 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  20. 7 CFR 227.44 - Management evaluations and reviews.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Management evaluations and reviews. 227.44 Section 227.44 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  1. 7 CFR 227.31 - Audits, management reviews, and evaluations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Audits, management reviews, and evaluations. 227.31 Section 227.31 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  2. 7 CFR 227.44 - Management evaluations and reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Management evaluations and reviews. 227.44 Section 227.44 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  3. 7 CFR 227.31 - Audits, management reviews, and evaluations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Audits, management reviews, and evaluations. 227.31 Section 227.31 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  4. 7 CFR 227.44 - Management evaluations and reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Management evaluations and reviews. 227.44 Section 227.44 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  5. 7 CFR 227.44 - Management evaluations and reviews.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Management evaluations and reviews. 227.44 Section 227.44 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  6. 7 CFR 227.44 - Management evaluations and reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Management evaluations and reviews. 227.44 Section 227.44 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  7. 7 CFR 227.31 - Audits, management reviews, and evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Audits, management reviews, and evaluations. 227.31 Section 227.31 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  8. 7 CFR 227.31 - Audits, management reviews, and evaluations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Audits, management reviews, and evaluations. 227.31 Section 227.31 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM...

  9. Report on School Food Services. MORE: Management Operations Review & Evaluation.

    ERIC Educational Resources Information Center

    Richardson, William M.; And Others

    Because of the size of its budget and the importance and complexity of its operation, the Division of Food Services in the Montgomery County (Maryland) Public Schools was one of the first selected for a series of Management Operations Review and Evaluation (MORE) studies. The Division directs the delivery of food services to all 178 schools in the…

  10. Review for the generalist: evaluation of anterior knee pain

    PubMed Central

    Houghton, Kristin M

    2007-01-01

    Anterior knee pain is common in children and adolescents. Evaluation and management is challenging and requires a thorough history and physical exam, and understanding of the pediatric skeleton. This article will review common causes of chronic anterior knee pain in the pediatric population with a focus on patellofemoral pain. PMID:17550634

  11. WINCADRE (COMPUTER-AIDED DATA REVIEW AND EVALUATION)

    EPA Science Inventory

    WinCADRE (Computer-Aided Data Review and Evaluation) is a Windows -based program designed for computer-assisted data validation. WinCADRE is a powerful tool which significantly decreases data validation turnaround time. The electronic-data-deliverable format has been designed ...

  12. 42 CFR 441.365 - Periodic evaluation, assessment, and review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIFIC SERVICES Home and Community-Based Services Waivers for Individuals Age 65 or Older: Waiver... receiving home and community-based waiver services under this subpart. (b) Evaluation and assessment review.... (6) Whether the recipient receives adequate care and services, based, at a minimum, on the...

  13. Subsurface barrier feasibility evaluation: External review meeting report

    SciTech Connect

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency.

  14. Compliance review for the UNH Storage Tank

    SciTech Connect

    Low, J.M.

    1992-05-19

    The purpose of Project S-4257, USF-UNH 150,000 Gallon Storage Tank, is to provide interim storage for the liquid uranyl nitrate (UNH) product from H-Canyon until the UNH can be processed in the new Uranium Solidification Facility (Project S-2052). NPSR was requested by Project Management and DOE-SR to perform a design compliance review for the UNH Storage Tank to support the Operational Readiness Review (ORR) and the Operational Readiness Evaluation (ORE), respectively. The project was reviewed against the design criteria contained in the DOE Order 6430.1A, General Design Criteria. This report documents the results of the compliance review.

  15. Economic evaluations in gastroenterology in Brazil: A systematic review

    PubMed Central

    de Paiva Haddad, Luciana Bertocco; Decimoni, Tassia Cristina; Turri, Jose Antonio; Leandro, Roseli; de Soárez, Patrícia Coelho

    2016-01-01

    AIM: To systematically review economic evaluations in gastroenterology, relating to Brazil, published between 1980 and 2013. METHODS: We selected full and partial economic evaluations from among those retrieved by searching the following databases: MEDLINE (PubMed); Excerpta Medica; the Latin American and Caribbean Health Sciences Literature database; the Scientific Electronic Library Online; the database of the Centre for Reviews and Dissemination; the National Health Service (NHS) Economic Evaluation Database; the NHS Health Technology Assessment database; the Health Economics database of the Brazilian Virtual Library of Health; Scopus; Web of Science; and the Brazilian Network for the Evaluation of Health Technologies. Two researchers, working independently, selected the studies and extracted the data. RESULTS: We identified 535 health economic evaluations relating to Brazil and published in the 1980-2013 period. Of those 535 articles, only 40 dealt with gastroenterology. Full and partial economic evaluations respectively accounted for 23 (57.5%) and 17 (42.5%) of the 40 studies included. Among the 23 full economic evaluations, there were 11 cost-utility analyses, seven cost-effectiveness analyses, four cost-consequence analyses, and one cost-minimization analysis. Of the 40 studies, 25 (62.5%) evaluated medications; 7 (17.5%) evaluated procedures; and 3 (7.5%) evaluated equipment. Most (55%) of the studies were related to viral hepatitis, and most (63.4%) were published after 2010. Other topics included gastrointestinal cancer, liver transplantation, digestive diseases and hernias. Over the 33-year period examined, the number of such economic evaluations relating to Brazil, especially of those evaluating medications for the treatment of hepatitis, increased considerably. CONCLUSION: Further studies are needed in order to ensure that expenditures on health care in Brazil are made as fairly and efficiently as possible. PMID:26855823

  16. 40 CFR 180.319 - Interim tolerances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... TOLERANCES AND EXEMPTIONS FOR PESTICIDE CHEMICAL RESIDUES IN FOOD Specific Tolerances § 180.319 Interim... pesticide chemicals in or on the following raw agricultural commodities: Substances Uses Tolerance in...

  17. Interim Prosthesis Options for Dental Implants.

    PubMed

    Siadat, Hakimeh; Alikhasi, Marzieh; Beyabanaki, Elaheh

    2016-01-24

    Dental implants have become a popular treatment modality for replacing missing teeth. In this regard, the importance of restoring patients with function during the implant healing period has grown in recent decades. Esthetic concerns, especially in the anterior region of the maxilla, should also be considered until the definitive restoration is delivered. Another indication for such restorations is maintenance of the space required for esthetic and functional definitive restorations in cases where the implant site is surrounded by natural teeth. Numerous articles have described different types of interim prostheses and their fabrication techniques. This article aims to briefly discuss all types of implant-related interim prostheses by different classification including provisional timing (before implant placement, after implant placement in unloading and loading periods), materials, and techniques used for making the restorations, the type of interim prosthesis retention, and definitive restoration. Furthermore, the abutment torque for such restorations and methods for transferring the soft tissue from interim to definitive prostheses are addressed.

  18. Usability evaluation techniques in mobile commerce applications: A systematic review

    NASA Astrophysics Data System (ADS)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.

    2016-08-01

    Obviously, there are a number of literatures concerning the usability of mobile commerce (m-commerce) applications and related areas, but they do not adequately provide knowledge about usability techniques used in most of the empirical usability evaluation for m-commerce application. Therefore, this paper is aimed at producing the usability techniques frequently used in the aspect of usability evaluation for m-commerce applications. To achieve the stated objective, systematic literature review was employed. Sixty seven papers were downloaded in usability evaluation for m-commerce and related areas; twenty one most relevant studies were selected for review in order to extract the appropriate information. The results from the review shows that heuristic evaluation, formal test and think aloud methods are the most commonly used methods in m-commerce application in comparison to cognitive walkthrough and the informal test methods. Moreover, most of the studies applied control experiment (33.3% of the total studies); other studies that applied case study for usability evaluation are 14.28%. The results from this paper provide additional knowledge to the usability practitioners and research community for the current state and use of usability techniques in m-commerce application.

  19. 78 FR 8522 - Chlorpyrifos Registration Review; Preliminary Evaluation of the Potential Risk From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... AGENCY Chlorpyrifos Registration Review; Preliminary Evaluation of the Potential Risk From Volatilization... review of chlorpyrifos and opens a public comment period on this document. Registration review is EPA's... has completed a preliminary volatilization assessment for chlorpyrifos uses. After reviewing...

  20. Investigating Architectural Quality Theories for School Evaluation: A Critical Review of Evaluation Instruments in Sweden

    ERIC Educational Resources Information Center

    Flygt, Erland

    2009-01-01

    This article presents a critical review of instruments used to evaluate compulsory schools in Sweden and is part of a doctoral programme project investigating the relationship between school architecture and learning. In Sweden, as in many countries, evaluation instruments are used both to improve school quality and as a means to provide…

  1. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  2. The School Action Effectiveness Study: Second Interim Report, Part II. Report No. 342.

    ERIC Educational Resources Information Center

    Gottfredson, Gary D.; And Others

    This report, the second part of a longer study prepared by the Delinquency and School Environments Program, further describes interim results of the program's national evaluation of the Office of Juvenile Justice and Delinquency Prevention's (OJJDP's) Alternative Education Program. The report consists of evaluations of 14 specific projects: (1)…

  3. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  4. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  5. Rural Community Service Coordinator Program Interim Evaluation.

    ERIC Educational Resources Information Center

    Heffernan, William D.; Heffernan, Judith Bortner

    This is an early assessment of the Rural Community Service Coordinator Program (RCSCP), organized by the University of Missouri Extension Service using funds from the federal Food Security Act of 1985. Five full-time coordinators were named by area mental health officials to help rural people cope with despair and emotional disturbances caused by…

  6. A Study of the Transitional Adjustment of a Professional Group to its Altered Role. Interim Report.

    ERIC Educational Resources Information Center

    Daniels, Morris J.

    This interim report discusses the adjustments auditing firms are making as a result of the advent of the computer. Data were obtained from (1) a review of the literature, (2) attendance at professional association meetings, and (3) a series of interviews with accountants. The findings to date indicate that the normative patterns governing the…

  7. 12 CFR 303.24 - Application for deposit insurance for an interim institution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Application for deposit insurance for an interim institution. 303.24 Section 303.24 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION... will be reviewed by a federal banking agency other than the FDIC. (c) Processing. An application...

  8. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Interim final... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... review by the Office of Management and Budget. This action is not subject to Executive Order...

  9. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  10. Evaluation of interdisciplinary and transdisciplinary research: a literature review.

    PubMed

    Klein, Julie T

    2008-08-01

    Interdisciplinarity has become a widespread mantra for research, accompanied by a growing body of publications. Evaluation, however, remains one of the least-understood aspects. This review of interdisciplinary and transdisciplinary research evaluation categorizes lessons from the emergent international literature on the topic reviewed in 2007. It defines parallels between research performance and evaluation, presents seven generic principles for evaluation, and reflects in the conclusion on changing connotations of the underlying concepts of discipline, peer, and measurement. Interdisciplinary and transdisciplinary research performance and evaluation are both generative processes of harvesting, capitalizing, and leveraging multiple expertise. Individual standards must be calibrated, and tensions among different disciplinary, professional, and interdisciplinary approaches carefully managed in balancing acts that require negotiation and compromise. Readiness levels are strengthened by antecedent conditions that are flexible enough to allow multiple pathways of integration and collaboration. In both cases, as well, new epistemic communities must be constructed and new cultures of evidence produced. The multidisciplinary-interdisciplinary-transdisciplinary research environment spans a wide range of contexts. Yet seven generic principles provide a coherent framework for thinking about evaluation: (1) variability of goals; (2) variability of criteria and indicators; (3) leveraging of integration; (4) interaction of social and cognitive factors in collaboration; (5) management, leadership, and coaching; (6) iteration in a comprehensive and transparent system; and (7) effectiveness and impact.

  11. Space shuttle SRM interim contract, part 1

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Essential studies and analyses required to integrate the SRM into the booster and overall space shuttle system. Emphasis was placed on the case, nozzle, insulation, and propellant components with resulting performance, weight, and structural load characteristics being generated. Effort conducted during the time period of this contract included studies, analyses, planning, and preliminary design activities. Technical requirements identified in the SRM Project Request for Proposal No. 8-1-4-94-98401 and Thiokol's proposed SRM design (designated Configuration 0) established the basis for this effort. The requirements were evaluated jointly with MSFC and altered where necessary to incorporate new information that evolved after issuance of the RFP and during the course of this interim contract. Revised water impact loads and load distributions were provided based on additional model test data and analytical effort conducted by NASA subsequent to the RFP release. Launch pad peaking loads into the SRM aft skirt were provided which also represented a change from RFP requirements. A modified SRM/External Tank (ET) attachment configuration with new structural load data was supplied by NASA, and direction was received to include a 2 percent inert weight contingency.

  12. Upper gastrointestinal barium evaluation of duodenal pathology: A pictorial review

    PubMed Central

    Gupta, Pankaj; Debi, Uma; Sinha, Saroj Kant; Prasad, Kaushal Kishor

    2014-01-01

    Like other parts of the gastrointestinal tract (GIT), duodenum is subject to a variety of lesions both congenital and acquired. However, unlike other parts of the GIT viz. esophagus, rest of the small intestine and large intestine, barium evaluation of duodenal lesions is technically more challenging and hence not frequently reported. With significant advances in computed tomography technology, a thorough evaluation including intraluminal, mural and extramural is feasible in a single non-invasive examination. Notwithstanding, barium evaluation still remains the initial and sometimes the only imaging study in several parts of the world. Hence, a thorough acquaintance with the morphology of various duodenal lesions on upper gastrointestinal barium examination is essential in guiding further evaluation. We reviewed our experience with various common and uncommon barium findings in duodenal abnormalities. PMID:25170399

  13. Review of Economic Submissions to NICE Medical Technologies Evaluation Programme.

    PubMed

    Alshreef, Abualbishr; Jenks, Michelle; Green, William; Dixon, Simon

    2016-12-01

    The economic evaluation of medical devices is increasingly used to inform decision making on adopting new or novel technologies; however, challenges are inevitable due to the unique characteristics of devices. Cost-consequence analyses are recommended and employed by the English National Institute for Health and Care Excellence (NICE) Medical Technologies Evaluation Programme (MTEP) to help address these challenges. The aim of this work was to review the critiques raised for previous MTEP submissions and explore if there were common problems across submissions. We reviewed a sample of 12 economic submissions to MTEP representing 50 % of 24 sets of guidance issued to July 2015. For each submission, we reviewed the External Assessment Centre's (EAC) report and the guidance document produced by NICE. We identified the main problems raised by the EAC's assessments and the committee's considerations for each submission, and explored strategies for improvement. We found that the identification and measurement of costs and consequences are the main shortcomings within economic submissions to MTEP. Together, these shortcomings accounted for 42 % of criticisms by the EACs among the reviewed submissions. In certain circumstances problems with these shortcomings may be unavoidable, for example, if there is a limited evidence base for the device being appraised. Nevertheless, strategies can often be adopted to improve submissions, including the use of more appropriate time horizons, whilst cost and resource use information should be taken, where possible, from nationally representative sources.

  14. Characterization of the radiation environment for a large-area interim spent-nuclear-fuel storage facility

    NASA Astrophysics Data System (ADS)

    Fortkamp, Jonathan C.

    Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.

  15. Training improves the interobserver agreement of the expert positron emission tomography review panel in primary mediastinal B-cell lymphoma: interim analysis in the ongoing International Extranodal Lymphoma Study Group-37 study.

    PubMed

    Ceriani, Luca; Barrington, Sally; Biggi, Alberto; Malkowski, Bogdan; Metser, Ur; Versari, Annibale; Martelli, Maurizio; Davies, Andrew; Johnson, Peter W; Zucca, Emanuele; Chauvie, Stéphane

    2016-08-22

    The International Extranodal Lymphoma Study Group (IELSG)-37 is a prospective randomized trial assessing the role of consolidation mediastinal radiotherapy after immunochemotherapy to patients with newly diagnosed primary mediastinal large B-cell lymphoma (PMBCL). It is a positron emission tomography (PET) response-guided study where patients obtaining a complete metabolic response on an end-of-therapy PET-computed tomography (CT) scan evaluated by a central review are randomized to receive radiotherapy or no further treatment. The aims of this study were to measure agreement between reviewers reporting PET-CT scans for this trial and to determine the effect of training upon concordance rates. The review panel comprised 6 experienced nuclear physicians who read PET-CT scans using the 5-point Deauville scale. Interobserver agreement (IOA) was measured at 4 time points: after a blinded review of a "training set" of 20 patients with PMBCL from the previous IELSG-26 study (phase 1); after the first 10 clinical cases enrolled in the IELSG-37 (phase 2); and after 2 further groups of 50 (phase 3) and 40 clinical cases (phase 4). After feedback from the training set and the first 10 cases, a meeting was held to discuss interpretation, and a detailed set of instructions for the review procedure was agreed and acted upon. Between 2012 and 2014, the first 100 patients were reviewed. Using Deauville score 3 as the cutoff for a complete metabolic response, the overall IOA among the reviewers was good (Krippendorff α = 0.72.) The binary concordance between pairs of reviewers (Cohen κ) ranged from 0.60 to 0.78. The IOA, initially moderate, improved progressively from phase 1 to 4 (Krippendorff α from 0.53 to 0.81; Cohen κ from 0.35-0.72 to 0.77-0.87). Our experience indicates that the agreement among "expert" nuclear physicians reporting PMBCL, even using standardized criteria, was only moderate when the study began. However, agreement improved using a harmonization process

  16. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  17. Evaluating investment in quality improvement capacity building: a systematic review

    PubMed Central

    Mery, Gustavo; Dobrow, Mark J; Baker, G Ross; Im, Jennifer; Brown, Adalsteinn

    2017-01-01

    Purpose Leading health systems have invested in substantial quality improvement (QI) capacity building, but little is known about the aggregate effect of these investments at the health system level. We conducted a systematic review to identify key steps and elements that should be considered for system-level evaluations of investment in QI capacity building. Methods We searched for evaluations of QI capacity building and evaluations of QI training programmes. We included the most relevant indexed databases in the field and a strategic search of the grey literature. The latter included direct electronic scanning of 85 relevant government and institutional websites internationally. Data were extracted regarding evaluation design and common assessment themes and components. Results 48 articles met the inclusion criteria. 46 articles described initiative-level non-economic evaluations of QI capacity building/training, while 2 studies included economic evaluations of QI capacity building/training, also at the initiative level. No system-level QI capacity building/training evaluations were found. We identified 17 evaluation components that fit within 5 overarching dimensions (characteristics of QI training; characteristics of QI activity; individual capacity; organisational capacity and impact) that should be considered in evaluations of QI capacity building. 8 key steps in return-on-investment (ROI) assessments in QI capacity building were identified: (1) planning—stakeholder perspective; (2) planning—temporal perspective; (3) identifying costs; (4) identifying benefits; (5) identifying intangible benefits that will not be included in the ROI estimation; (6) discerning attribution; (7) ROI calculations; (8) sensitivity analysis. Conclusions The literature on QI capacity building evaluation is limited in the number and scope of studies. Our findings, summarised in a Framework to Guide Evaluations of QI Capacity Building, can be used to start closing this knowledge

  18. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  19. 46 CFR 309.101 - Amendment of interim binders.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amendment of interim binders. 309.101 Section 309.101... INSURANCE § 309.101 Amendment of interim binders. The interim binder for a vessel whose stated valuation is established pursuant to this part shall be deemed to have been amended on the first day of the...

  20. 18 CFR 385.1113 - Interim relief (Rule 1113).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim relief (Rule... Under the NGPA § 385.1113 Interim relief (Rule 1113). (a) The petitioner may at any time file a request for interim relief in a proceeding under this subpart, setting forth the legal and factual basis...

  1. 24 CFR 115.203 - Interim certification procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim certification procedures... Certification of Substantially Equivalent Agencies § 115.203 Interim certification procedures. (a) Upon receipt of a request for interim certification filed under § 115.202, the Assistant Secretary may...

  2. 48 CFR 801.690-8 - Interim appointment provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Interim appointment... Authority, and Responsibilities 801.690-8 Interim appointment provisions. (a) To ensure availability of procurement support, an interim appointment may be granted for a limited period of time when a candidate...

  3. 10 CFR 205.288 - Interim and ancillary orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Interim and ancillary orders. 205.288 Section 205.288... Distribution of Refunds § 205.288 Interim and ancillary orders. The Director of the Office of Hearings and Appeals or his designee may issue any interim or ancillary orders, or make any rulings or...

  4. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... COMMISSION Interim Staff Guidance on Changes During Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing this notice for use of, and to solicit public comment on the draft Interim...

  5. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information... commission may elect to establish an interim wholesale rate as described in paragraph (b) of this section....

  6. 5 CFR 1209.11 - Duration of stay; interim compliance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Duration of stay; interim compliance... WHISTLEBLOWING Stay Requests § 1209.11 Duration of stay; interim compliance. (a) Duration of stay. A stay becomes...) Interim compliance. An agency must immediately comply with an order granting a stay request. Although...

  7. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Qualifying for interim status. 270.70... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.70 Qualifying for interim status. (a) Any person who owns or operates an “existing HWM facility” or a...

  8. 40 CFR 66.23 - Interim recalculation of penalty.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Interim recalculation of penalty. 66... Penalties § 66.23 Interim recalculation of penalty. (a) The Administrator, upon concluding that a previously... respond in accordance with the provisions of § 66.51. The decision to accept the interim calculation or...

  9. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  10. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  11. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Interim appointments. 301... Interim appointments. If it is essential to appoint an individual as a Contracting Officer who does not... HCA (non-delegable) may make an interim appointment for up to 2 years. If an extension of time...

  12. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.570 Section 417... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment. (1) CMS makes monthly advance payments equivalent to the HMO's or CMP's interim per capita rate...

  13. 5 CFR 531.414 - Interim within-grade increase.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Interim within-grade increase. 531.414... UNDER THE GENERAL SCHEDULE Within-Grade Increases § 531.414 Interim within-grade increase. (a) An interim within-grade increase shall be granted to an employee who has: (1) Appealed a negative...

  14. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... of accessible OTRBs, the operator shall meet the following interim service requirements:...

  15. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section... Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment. Claimants may apply for an interim emergency payment, prior to a determination under § 94.21(a). If...

  16. 41 CFR 101-29.206 - Interim Federal standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interim Federal standard. 101-29.206 Section 101-29.206 Public Contracts and Property Management Federal Property Management... DESCRIPTIONS 29.2-Definitions § 101-29.206 Interim Federal standard. An interim Federal standard is a...

  17. 24 CFR 115.202 - Request for interim certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Request for interim certification... Certification of Substantially Equivalent Agencies § 115.202 Request for interim certification. (a) A request for interim certification under this subpart shall be filed with the Assistant Secretary by the...

  18. 40 CFR 270.72 - Changes during interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Changes during interim status. 270.72... (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Interim Status § 270.72 Changes during interim status. (a) Except as provided in paragraph (b), the owner or operator of...

  19. 7 CFR 900.70 - Applications for interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Applications for interim relief. 900.70 Section 900.70... Applications for interim relief. (a) Filing the application. A person who has filed a petition pursuant to... statement of the objections, if any, of the Administrator to the application for interim relief, and may...

  20. 40 CFR 264.3 - Relationship to interim status standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Relationship to interim status... FACILITIES General § 264.3 Relationship to interim status standards. A facility owner or operator who has fully complied with the requirements for interim status—as defined in section 3005(e) of RCRA...

  1. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  2. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  3. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  4. 76 FR 59066 - Notice of Regulatory Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ...; ] FEDERAL HOUSING FINANCE AGENCY 12 CFR Chapter XII Notice of Regulatory Review Plan AGENCY: Federal Housing...) is issuing a notice of and requesting comments on the FHFA interim regulatory review plan for review.... Comments FHFA invites comments on all aspects of the interim regulatory review plan, including legal...

  5. CMM Interim Check Design of Experiments (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  6. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  7. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSUMER PRODUCTS Test Procedures § 430.27 Petitions for waiver and applications for interim waiver. (a)(1... design characteristics which either prevent testing of the basic model according to the prescribed test procedures, or the prescribed test procedures may evaluate the basic model in a manner so unrepresentative...

  8. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSUMER PRODUCTS Test Procedures § 430.27 Petitions for waiver and applications for interim waiver. (a)(1... design characteristics which either prevent testing of the basic model according to the prescribed test procedures, or the prescribed test procedures may evaluate the basic model in a manner so unrepresentative...

  9. Prospects: The Congressionally Mandated Study of Educational Growth and Opportunity. The Interim Report.

    ERIC Educational Resources Information Center

    Puma, Michael J.; And Others

    This publication is the first interim report from the Congressionally Mandated Study of Educational Growth and Opportunity (Prospects), and describes students' characteristics and the schools they attend. Prospects is designed to evaluate the short- and long-term consequences of Chapter 1 program participation by following for 5 years large…

  10. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    SciTech Connect

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  11. Cost Implications of an Interim Storage Facility in the Waste Management System

    SciTech Connect

    Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L; Petersen, Gordon M.; Nutt, Mark; Carter, Joe; Cotton, Thomas

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  12. Peer-supported review of teaching: an evaluation.

    PubMed

    Thampy, Harish; Bourke, Michael; Naran, Prasheena

    2015-09-01

    Peer-supported review (also called peer observation) of teaching is a commonly implemented method of ascertaining teaching quality that supplements student feedback. A large variety of scheme formats with rather differing purposes are described in the literature. They range from purely formative, developmental formats that facilitate a tutor's reflection of their own teaching to reaffirm strengths and identify potential areas for development through to faculty- or institution-driven summative quality assurance-based schemes. Much of the current literature in this field focuses within general higher education and on the development of rating scales, checklists or observation tools to help guide the process. This study reports findings from a qualitative evaluation of a purely formative peer-supported review of teaching scheme that was implemented for general practice clinical tutors at our medical school and describes tutors' attitudes and perceived benefits and challenges when undergoing observation.

  13. Human factors evaluation of teletherapy: Literature review. Volume 5

    SciTech Connect

    Henriksen, K.; Kaye, R.D.; Jones, R.; Morisseau, D.S.; Serig, D.L.

    1995-07-01

    A series of human factors evaluations were undertaken to better understand the contributing factors to human error in the teletherapy environment. Teletherapy is a multidisciplinary methodology for treating cancerous tissue through selective exposure to an external beam of ionizing radiation. A team of human factors specialists, assisted by a panel of radiation oncologists, medical physicists, and radiation therapists, conducted site visits to radiation oncology departments at community hospitals, university centers, and free-standing clinics. A function and task analysis was performed initially to guide subsequent evaluations in the areas of workplace environment, system-user interfaces, procedures, training, and organizational practices. To further acquire an in-depth and up-to-date understanding of the practice of teletherapy in support of these evaluations, a systematic literature review was conducted. Factors that have a potential impact on the accuracy of treatment delivery were of primary concern. The present volume is the literature review. The volume starts with an overview of the multiphased nature of teletherapy, and then examines the requirement for precision, the increasing role of quality assurance, current conceptualizations of human error, and the role of system factors such as the workplace environment, user-system interfaces, procedures, training, and organizational practices.

  14. Interim Control Module Extraction Strut Assembly

    NASA Technical Reports Server (NTRS)

    Hansen, Chris

    1999-01-01

    The Interim Control Module is a propulsion and attitude control module for the International Space Station developed to serve as a replacement for the Russian Service Module in the event that Russia does not deliver the hardware as expected. The hardware was developed through a joint NASA/Naval Research Laboratory program and is based on a Department of Defense payload. This paper discusses the development and testing of the Extraction Strut hardware that will be used to assist in removing the Interim Control Module from the Shuttle's payload bay.

  15. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  16. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13

  17. Review of progress in quantitative nondestructive evaluation. Vol. 3B

    SciTech Connect

    Thompson, D.O.; Chimenti, D.E.

    1984-01-01

    This two-book volume constitutes the Proceedings of the Tenth Annual Review of Progress in Quantitative Nondestructive Evaluation held in California in 1983. Topics considered include nondestructive evaluation (NDE) reliability, ultrasonics (probability of detection, scattering, sizing, transducers, signal processing, imaging and reconstruction), eddy currents (probability of detection, modeling, sizing, probes), acoustic emission, thermal wave imaging, optical techniques, new techniques (e.g., maximum entropy reconstruction, near-surface inspection of flaws using bulk ultrasonic waves, inversion and reconstruction), composite materials, material properties, acoustoelasticity, residual stress, and new NDE systems (e.g., retirement-for-cause procedures for gas turbine engine components, pulsed eddy current flaw detection and characterization, an ultrasonic inspection protocol for IN100 jet engine materials, electromagnetic on-line monitoring of rotating turbine-generator components). Basic research and early engineering applications are emphasized.

  18. 25 CFR 1000.356 - May the trust evaluation process be used for additional reviews?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reviews? 1000.356 Section 1000.356 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS, DEPARTMENT... INDIAN SELF-DETERMINATION AND EDUCATION ACT Trust Evaluation Review Annual Trust Evaluations § 1000.356 May the trust evaluation process be used for additional reviews? Yes, if the parties agree....

  19. Evaluation of Item Candidates: The PROMIS Qualitative Item Review

    PubMed Central

    DeWalt, Darren A.; Rothrock, Nan; Yount, Susan; Stone, Arthur A.

    2009-01-01

    One of the PROMIS (Patient-Reported Outcome Measurement Information System) network's primary goals is the development of a comprehensive item bank for patient-reported outcomes of chronic diseases. For its first set of item banks, PROMIS chose to focus on pain, fatigue, emotional distress, physical function, and social function. An essential step for the development of an item pool is the identification, evaluation, and revision of extant questionnaire items for the core item pool. In this work, we also describe the systematic process wherein items are classified for subsequent statistical processing by the PROMIS investigators. Six phases of item development are documented: identification of extant items, item classification and selection, item review and revision, focus group input on domain coverage, cognitive interviews with individual items, and final revision before field testing. Identification of items refers to the systematic search for existing items in currently available scales. Expert item review and revision was conducted by trained professionals who reviewed the wording of each item and revised as appropriate for conventions adopted by the PROMIS network. Focus groups were used to confirm domain definitions and to identify new areas of item development for future PROMIS item banks. Cognitive interviews were used to examine individual items. Items successfully screened through this process were sent to field testing and will be subjected to innovative scale construction procedures. PMID:17443114

  20. Is It Worth It? The Red Deer Public School District Evaluates a Review Program.

    ERIC Educational Resources Information Center

    Jesse, Ken; Cooper, Alan

    1986-01-01

    A school review program was evaluated to determine the attitudes of administrators, teachers, and parents toward the review process. Results showed administrators most positive about the review and parents often unaware of review results. Continuation of the review process is recommended and should include communication with all involved parties.…

  1. Using dyes for evaluating photocatalytic properties: a critical review.

    PubMed

    Rochkind, Malka; Pasternak, Sagi; Paz, Yaron

    2014-12-23

    This brief review aims at analyzing the use of dyestuffs for evaluating the photocatalytic properties of novel photocatalysts. It is shown that the use of dyes as predictors for photocatalytic activity has its roots in the pre visible-light activity era, when the aim was to treat effluents streams containing hazardous dyes. The main conclusion of this review is that, in general, dyes are inappropriate as model compounds for the evaluation of photocatalytic activity of novel photocatalysts claimed to operate under visible light. Their main advantage, the ability to use UV-Vis spectroscopy, is severely limited by a variety of factors, most of which are related to the presence of other species. The presence of a second mechanism, sensitization, diminishes the generality required from a model contaminant used for testing a novel photocatalyst. While it is recommended not to use dyes for general testing of novel photocatalysts, it is still understandable that a model system consisting of a dye and a semiconductor can be of large importance if the degradation of a specific dye is the main aim of the research, or, alternatively, if the abilities of a specific dye to induce the degradation of a different type of contaminant are under study.

  2. Economic evaluation of enhanced asthma management: a systematic review

    PubMed Central

    Yong, Yee V.; Shafie, Asrul A.

    2014-01-01

    Objectives: To evaluate and compare full economic evaluation studies on the cost-effectiveness of enhanced asthma management (either as an adjunct to usual care or alone) vs. usual care alone. Methods: Online databases were searched for published journal articles in English language from year 1990 to 2012, using the search terms ‘“asthma” AND (“intervene” OR “manage”) AND (“pharmacoeconomics” OR “economic evaluation” OR “cost effectiveness” OR “cost benefit” OR “cost utility”)’. Hand search was done for local publishing. Only studies with full economic evaluation on enhanced management were included (cost consequences (CC), cost effectiveness (CE), cost benefit (CB), or cost utility (CU) analysis). Data were extracted and assessed for the quality of its economic evaluation design and evidence sources. Results: A total of 49 studies were included. There were 3 types of intervention for enhanced asthma management: education, environmental control, and self-management. The most cost-effective enhanced management was a mixture of education and self-management by an integrated team of healthcare and allied healthcare professionals. In general, the studies had a fair quality of economic evaluation with a mean QHES score of 73.7 (SD=9.7), and had good quality of evidence sources. Conclusion: Despite the overall fair quality of economic evaluations but good quality of evidence sources for all data components, this review showed that the delivered enhanced asthma managements, whether as single or mixed modes, were overall effective and cost-reducing. Whilst the availability and accessibility are an equally important factor to consider, the sustainability of the cost-effective management has to be further investigated using a longer time horizon especially for chronic diseases such as asthma. PMID:25580173

  3. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  4. The Interim Superintendent: A Case Study

    ERIC Educational Resources Information Center

    Bigham, Gary; Nix, Susan J.

    2011-01-01

    Considering the vitally important role that the superintendent plays in the overall functioning and wellbeing of any school district, the filling of that position should never be done in haste. Due to the importance of this process and the time it requires, school districts often employ an interim superintendent. In this single case study, one…

  5. 45 CFR 83.20 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Interim procedures. 83.20 Section 83.20 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION REGULATION FOR THE ADMINISTRATION AND ENFORCEMENT OF SECTIONS 799A AND 845 OF THE PUBLIC HEALTH SERVICE ACT Procedures § 83.20...

  6. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a...

  7. 19 CFR 356.18 - Interim sanctions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim sanctions. 356.18 Section 356.18 Customs Duties INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE PROCEDURES AND RULES FOR IMPLEMENTING ARTICLE 1904 OF THE NORTH AMERICAN FREE TRADE AGREEMENT Violation of a Protective Order or a...

  8. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification...

  9. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  10. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 3 2013-04-01 2013-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  11. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 3 2012-04-01 2012-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  12. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  13. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 3 2014-04-01 2014-04-01 false Interim measures. 207.106 Section 207.106 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION NONADJUDICATIVE INVESTIGATIONS INVESTIGATIONS OF WHETHER INJURY TO DOMESTIC INDUSTRIES RESULTS FROM IMPORTS SOLD AT LESS THAN FAIR VALUE OR FROM...

  14. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  15. Interim Report - Grant AFOSR-85-0065.

    DTIC Science & Technology

    1985-06-30

    Option 065 Drafting Plotter 1 7475A 6 Pen Graphics Plotter Vendor: Imagen Corporation $ 11,266 1 Model 8/300 Laser Printer System, 512Kbytes memory 1... Imagen 8/300 Laser Printer 3 Interim Report Grant No. AFOSR-85-0065 was equivalent to the Versatec plotter for small plots and better for text output

  16. 340 waste handling facility interim safety basis

    SciTech Connect

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  17. Economic evaluations of implantable cardioverter defibrillators: a systematic review.

    PubMed

    García-Pérez, Lidia; Pinilla-Domínguez, Pilar; García-Quintana, Antonio; Caballero-Dorta, Eduardo; García-García, F Javier; Linertová, Renata; Imaz-Iglesia, Iñaki

    2015-11-01

    The aim of this paper was to review the cost-effectiveness studies of implantable cardioverter defibrillators (ICD) for primary or secondary prevention of sudden cardiac death (SCD). A systematic review of the literature published in English or Spanish was performed by electronically searching MEDLINE and MEDLINE in process, EMBASE, NHS-EED, and EconLit. Some keywords were implantable cardioverter defibrillator, heart failure, heart arrest, myocardial infarction, arrhythmias, syncope, sudden death. Selection criteria were the following: (1) full economic evaluations published after 1995, model-based studies or alongside clinical trials (2) that explored the cost-effectiveness of ICD with or without associated treatment compared with placebo or best medical treatment, (3) in adult patients for primary or secondary prevention of SCD because of ventricular arrhythmias. Studies that fulfilled these criteria were reviewed and data were extracted by two reviewers. The methodological quality of the studies was assessed and a narrative synthesis was prepared. In total, 24 studies were included: seven studies on secondary prevention and 18 studies on primary prevention. Seven studies were performed in Europe. For secondary prevention, the results showed that the ICD is considered cost-effective in patients with more risk. For primary prevention, the cost-effectiveness of ICD has been widely studied, but uncertainty about its cost-effectiveness remains. The cost-effectiveness ratios vary between studies depending on the patient characteristics, methodology, perspective, and national settings. Among the European studies, the conclusions are varied, where the ICD is considered cost-effective or not dependent on the study.

  18. NATO/CCMS pilot study: Evaluation of demonstrated and emerging technologies for the treatment and clean up of contaminated land and groundwater (phase 2). Interim status report number 203

    SciTech Connect

    1995-05-01

    The document provides an interim status report on the second phase of a Pilot Study designed to share information among countries on innovative treatment technologies. The report is divided into four parts. The first part contains abstracts of each of the technical case studies sanctioned by the Pilot Study prior to September 1994. The second part of the report contains preliminary information on 15 projects newly accepted by the Pilot Study in September 1994. The table on page 30 provides an overview of these projects. The third part contains summaries of guest presentations of general interest made at Pilot Study meetings. The fourth section of the report contains a brief description of NATO fellowships projects.

  19. Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment

    SciTech Connect

    Spiliotopoulos, Alexandros A.

    2013-03-20

    This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

  20. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies

  1. Integrating Multiple Criteria Evaluation and GIS in Ecotourism: a Review

    NASA Astrophysics Data System (ADS)

    Mohd, Z. H.; Ujang, U.

    2016-09-01

    The concept of 'Eco-tourism' is increasingly heard in recent decades. Ecotourism is one adventure that environmentally responsible intended to appreciate the nature experiences and cultures. Ecotourism should have low impact on environment and must contribute to the prosperity of local residents. This article reviews the use of Multiple Criteria Evaluation (MCE) and Geographic Information System (GIS) in ecotourism. Multiple criteria evaluation mostly used to land suitability analysis or fulfill specific objectives based on various attributes that exist in the selected area. To support the process of environmental decision making, the application of GIS is used to display and analysis the data through Analytic Hierarchy Process (AHP). Integration between MCE and GIS tool is important to determine the relative weight for the criteria used objectively. With the MCE method, it can resolve the conflict between recreation and conservation which is to minimize the environmental and human impact. Most studies evidences that the GIS-based AHP as a multi criteria evaluation is a strong and effective in tourism planning which can aid in the development of ecotourism industry effectively.

  2. Review Article: Economic evaluation of flood damage to agriculture - review and analysis of existing methods

    NASA Astrophysics Data System (ADS)

    Brémond, P.; Grelot, F.; Agenais, A.-L.

    2013-10-01

    In Europe, economic evaluation of flood management projects is increasingly used to help decision making. At the same time, the management of flood risk is shifting towards new concepts such as giving more room to water by restoring floodplains. Agricultural areas are particularly targeted by projects following those concepts since they are frequently located in floodplain areas and since the potential damage to such areas is expected to be lower than to cities or industries for example. Additional or avoided damage to agriculture may have a major influence on decisions concerning these projects and the economic evaluation of flood damage to agriculture is thus an issue that needs to be tackled. The question of flood damage to agriculture can be addressed in different ways. This paper reviews and analyzes existing studies which have developed or used damage functions for agriculture in the framework of an economic appraisal of flood management projects. A conceptual framework of damage categories is proposed for the agricultural sector. The damage categories were used to structure the review. Then, a total of 42 studies are described, with a detailed review of 26 of them, based on the following criteria: types of damage considered, the influential flood parameters chosen, and monetized damage indicators used. The main recommendations resulting from this review are that even if existing methods have already focused on damage to crops, still some improvement is needed for crop damage functions. There is also a need to develop damage functions for other agricultural damage categories, including farm buildings and their contents. Finally, to cover all possible agricultural damage, and in particular loss of activity, a farm scale approach needs to be used.

  3. “Real-World” Practical Evaluation Strategies: A Review of Telehealth Evaluation

    PubMed Central

    Masters, Caitlin; Kvedar, Joseph; Jethwani, Kamal

    2014-01-01

    Background Currently, the increasing interest in telehealth and significant technological breakthroughs of the past decade create favorable conditions for the widespread adoption of telehealth services. Therefore, expectations are high that telehealth can help alleviate prevailing challenges in health care delivery. However, in order to translate current research to policy and facilitate adoption by patients and health care providers, there is need for compelling evidence of the effectiveness of telehealth interventions. Such evidence is gathered from rigorously designed research studies, which may not always be practical in many real-world settings. Objective Our aim was to summarize current telehealth evaluation strategies and challenges and to outline practical approaches to conduct evaluation in real-world settings using one of our previously reported telehealth initiatives, the Diabetes Connect program, as a case study. Methods We reviewed commonly used current evaluation frameworks and strategies, as well as best practices based on successful evaluative efforts to date to address commonly encountered challenges in telehealth evaluation. These challenges in telehealth evaluation and commonly used frameworks are described relevant to the evaluation of Diabetes Connect, a 12-month Web-based blood glucose monitoring program. Results Designers of telehealth evaluation frameworks must give careful consideration to the elements of planning, implementation, and impact assessment of interventions. Evaluating performance at each of these phases is critical to the overall success of an intervention. Although impact assessment occurs at the end of a program, our review shows that it should begin at the point of problem definition. Critical to the success of an evaluative strategy is early planning that involves all stakeholders to identify the overall goals of the program and key measures of success at each phase of the program life cycle. This strategy should enable

  4. Review for the generalist: evaluation of pediatric hip pain

    PubMed Central

    Houghton, Kristin M

    2009-01-01

    Hip pathology may cause groin pain, referred thigh or knee pain, refusal to bear weight or altered gait in the absence of pain. A young child with an irritable hip poses a diagnostic challenge. Transient synovitis, one of the most common causes of hip pain in children, must be differentiated from septic arthritis. Hip pain may be caused by conditions unique to the growing pediatric skeleton including Perthes disease, slipped capital femoral epiphysis and apophyseal avulsion fractures of the pelvis. Hip pain may also be referred from low back or pelvic pathology. Evaluation and management requires a thorough history and physical exam, and understanding of the pediatric skeleton. This article will review common causes of hip and pelvic musculoskeletal pain in the pediatric population. PMID:19450281

  5. 33 CFR 116.30 - Administrator, Office of Bridge Programs Review and Evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Programs Review and Evaluation. 116.30 Section 116.30 Navigation and Navigable Waters COAST GUARD..., Office of Bridge Programs Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from a District Commander, the Administrator, Office of Bridge Programs will review all the...

  6. 33 CFR 116.30 - Administrator, Office of Bridge Programs Review and Evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Programs Review and Evaluation. 116.30 Section 116.30 Navigation and Navigable Waters COAST GUARD..., Office of Bridge Programs Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from a District Commander, the Administrator, Office of Bridge Programs will review all the...

  7. 33 CFR 116.30 - Administrator, Bridge Administration Program Review and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administration Program Review and Evaluation. 116.30 Section 116.30 Navigation and Navigable Waters COAST GUARD..., Bridge Administration Program Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from a District Commander, the Administrator, Bridge Administration Program will review all...

  8. Evaluation of the child with acute ataxia: a systematic review.

    PubMed

    Whelan, Harry T; Verma, Sumit; Guo, Yan; Thabet, Farouq; Bozarth, Xiuhua; Nwosu, Michelle; Katyayan, Akshat; Parachuri, Venu; Spangler, Katie; Ruggeri, Barbara E; Srivatsal, Sindhu; Zhang, Guojun; Ashwal, Stephen

    2013-07-01

    Evaluation of acute ataxia in a child poses a dilemma for the clinician in determining the extent and timing of initial screening tests. This article reviews the evidence concerning the diagnostic yield of commonly ordered tests in evaluating the child with acute ataxia. The literature revealed the following frequencies of laboratory screening abnormalities in children with acute ataxia: CT (∼2.5%), MRI (∼5%), lumbar puncture (43%), EEG (42%), and toxicology (49%). In most studies, abnormalities detected by these screening tests were nondiagnostic. There are insufficient data to assess yields of testing for autoimmune disorders or inborn errors of metabolism. A toxicology screen should be considered in all children presenting with acute ataxia. Neuroimaging should be considered in all children with new onset ataxia. Cerebrospinal fluid analysis has limited diagnostic specificity unless clinically indicated. Studies to examine neurophysiology testing did have sufficient evidence to support their use. There is insufficient evidence to establish a role for autoantibody testing or for routine screening for inborn error of metabolism in children presenting with acute ataxia. Finally, in a child presenting with ataxia and opsoclonus myoclonus, urine catecholamine testing for occult neuroblastoma is recommended. Nuclear scan may be considered, however, there is insufficient evidence for additional body imaging.

  9. The effect of incorporation, orientation and silane treatment of glass fibers on the fracture resistance of interim fixed partial dentures.

    PubMed

    Basant, Gupta; Reddy, Y G

    2011-03-01

    Fracture of interim fixed partial dentures (FPD) is of important concern to the dental surgeon, especially with long-span fixed partial dentures or areas of heavy occlusal stress. Polymers used in interim FPDs, reinforced with glass fibers have shown to have a positive effect on the fracture resistance of interim FPDs. Since little research has been done on the influence of silane treated glass fibers on the fracture resistance of interim FPDs, this study was conducted to evaluate the effect of silane treatment of glass fibers on the fracture resistance of interim FPDs and its correlation with the position of fiber reinforcement and length of the span of the interim FPD. Interim FPDs were fabricated from an autopolymerizing polymethyl methacrylate (PMMA) resin. Seven FPDs were made in each group. The FPDs in the control group were unreinforced, and in the other groups the FPDs were reinforced either with non silane treated glass fiber or with silane treated glass fiber. The fibers were placed in two different locations in the FPDs. Three length of span of FPDs were tested. The load was applied to the FPD by a steel ball placed in the center of the pontic space. One Way Anova, Two Way Anova, Studentized range test (Scheffe's). Results showed that the load required for fracturing the unreinforced FPDs varied from 272 to 998 N. Mean fracture load of reinforced FPDs varied from 536 to 1642 N. One-way analysis of variance showed that the position of fibers and the silane treatment fibers significantly affected the fracture load. The results of this study suggested that the silane treatment of glass fibers had a marked improvement in the fracture resistance of FPDs as compared to untreated glass fibers. Selective placement of the glass fibers at the undersurface of the pontic and the occlusal surface of the interim fixed partial denture showed more increase in the fracture resistance as compared to the randomly distributed glass fibers. The glass fiber reinforcement is

  10. Systematic review of methods for evaluating healthcare research economic impact

    PubMed Central

    2010-01-01

    Background The economic benefits of healthcare research require study so that appropriate resources can be allocated to this research, particularly in developing countries. As a first step, we performed a systematic review to identify the methods used to assess the economic impact of healthcare research, and the outcomes. Method An electronic search was conducted in relevant databases using a combination of specific keywords. In addition, 21 relevant Web sites were identified. Results The initial search yielded 8,416 articles. After studying titles, abstracts, and full texts, 18 articles were included in the analysis. Eleven other reports were found on Web sites. We found that the outcomes assessed as healthcare research payback included direct cost-savings, cost reductions in healthcare delivery systems, benefits from commercial advancement, and outcomes associated with improved health status. Two methods were used to study healthcare research payback: macro-economic studies, which examine the relationship between research studies and economic outcome at the aggregated level, and case studies, which examine specific research projects to assess economic impact. Conclusions Our study shows that different methods and outcomes can be used to assess the economic impacts of healthcare research. There is no unique methodological approach for the economic evaluation of such research. In our systematic search we found no research that had evaluated the economic return of research in low and middle income countries. We therefore recommend a consensus on practical guidelines at international level on the basis of more comprehensive methodologies (such as Canadian Academic of Health Science and payback frameworks) in order to build capacity, arrange for necessary informative infrastructures and promote necessary skills for economic evaluation studies. PMID:20196839

  11. Leading Curriculum Innovation in Primary Schools Project: An Interim Report on School Leaders' Roles in Curriculum Development in England

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane; Rhodes, Christopher

    2010-01-01

    This article provides an interim report on a two-phase study of curriculum innovation in primary schools in England during one of the most significant periods of change for the last two decades. More specifically, the study addresses the challenges to school leaders created by the Rose Review of the primary curriculum. This article presents and…

  12. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Federal Highway Administration Congestion Mitigation and Air Quality Improvement Program Interim Guidance... Mitigation and Air Quality Improvement (CMAQ) Program (Interim Guidance). The Interim Guidance revises CMAQ....gov/environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This...

  13. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Federal Aviation Administration Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential Property AGENCY: Federal Aviation Administration (FAA). ACTION: Interim policy; amendment to sponsor grant assurance 5. SUMMARY: This action adopts an interim policy amending...

  14. The Influence of Peer Reviewer Expertise on the Evaluation of Research Funding Applications

    PubMed Central

    Sullivan, Joanne H.; Glisson, Scott R.

    2016-01-01

    Although the scientific peer review process is crucial to distributing research investments, little has been reported about the decision-making processes used by reviewers. One key attribute likely to be important for decision-making is reviewer expertise. Recent data from an experimental blinded review utilizing a direct measure of expertise has found that closer intellectual distances between applicant and reviewer lead to harsher evaluations, possibly suggesting that information is differentially sampled across subject-matter expertise levels and across information type (e.g. strengths or weaknesses). However, social and professional networks have been suggested to play a role in reviewer scoring. In an effort to test whether this result can be replicated in a real-world unblinded study utilizing self-assessed reviewer expertise, we conducted a retrospective multi-level regression analysis of 1,450 individual unblinded evaluations of 725 biomedical research funding applications by 1,044 reviewers. Despite the large variability in the scoring data, the results are largely confirmatory of work from blinded reviews, by which a linear relationship between reviewer expertise and their evaluations was observed—reviewers with higher levels of self-assessed expertise tended to be harsher in their evaluations. However, we also found that reviewer and applicant seniority could influence this relationship, suggesting social networks could have subtle influences on reviewer scoring. Overall, these results highlight the need to explore how reviewers utilize their expertise to gather and weight information from the application in making their evaluations. PMID:27768760

  15. The Influence of Peer Reviewer Expertise on the Evaluation of Research Funding Applications.

    PubMed

    Gallo, Stephen A; Sullivan, Joanne H; Glisson, Scott R

    2016-01-01

    Although the scientific peer review process is crucial to distributing research investments, little has been reported about the decision-making processes used by reviewers. One key attribute likely to be important for decision-making is reviewer expertise. Recent data from an experimental blinded review utilizing a direct measure of expertise has found that closer intellectual distances between applicant and reviewer lead to harsher evaluations, possibly suggesting that information is differentially sampled across subject-matter expertise levels and across information type (e.g. strengths or weaknesses). However, social and professional networks have been suggested to play a role in reviewer scoring. In an effort to test whether this result can be replicated in a real-world unblinded study utilizing self-assessed reviewer expertise, we conducted a retrospective multi-level regression analysis of 1,450 individual unblinded evaluations of 725 biomedical research funding applications by 1,044 reviewers. Despite the large variability in the scoring data, the results are largely confirmatory of work from blinded reviews, by which a linear relationship between reviewer expertise and their evaluations was observed-reviewers with higher levels of self-assessed expertise tended to be harsher in their evaluations. However, we also found that reviewer and applicant seniority could influence this relationship, suggesting social networks could have subtle influences on reviewer scoring. Overall, these results highlight the need to explore how reviewers utilize their expertise to gather and weight information from the application in making their evaluations.

  16. Biocides for the Battlefield - Interim Report

    DTIC Science & Technology

    2010-09-24

    for public release; distribution is unlimited. James H . Wynne Materials Chemistry Branch Chemistry Division Preston a. Fulmer Chemical Dynamics and...b. ABSTRACT c. THIS PAGE 18. NUMBER OF PAGES 17. LIMITATION OF ABSTRACT Biocides for the Battlefield—Interim Report James H . Wynne and Preston A...distribution is unlimited. Unclassified Unclassified Unclassified SAR 25 James H . Wynne (202) 404-4010 The ability to disinfect surfaces and manufacture self

  17. 10 CFR 709.16 - Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI evaluations. 709.16 Section 709.16 Energy DEPARTMENT OF... § 709.16 Application of Counterintelligence Evaluation Review Boards in reaching conclusions...

  18. 10 CFR 709.16 - Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI evaluations. 709.16 Section 709.16 Energy DEPARTMENT OF... § 709.16 Application of Counterintelligence Evaluation Review Boards in reaching conclusions...

  19. 10 CFR 709.16 - Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI evaluations. 709.16 Section 709.16 Energy DEPARTMENT OF... § 709.16 Application of Counterintelligence Evaluation Review Boards in reaching conclusions...

  20. 10 CFR 709.16 - Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI evaluations. 709.16 Section 709.16 Energy DEPARTMENT OF... § 709.16 Application of Counterintelligence Evaluation Review Boards in reaching conclusions...

  1. Recommended alternative for interim stabilization of Tank 241-C-103

    SciTech Connect

    Dukelow, G.T.; Turner, D.A.; Grigsby, J.M.

    1995-04-01

    The waste in tank 241-C-103 poses several health and safety risks and potential soil contamination caused by tank leaks. To minimize the risk of contaminating the soil beneath the tank, the pumpable waste liquids are planned to be removed by salt well pumping. In addition to aqueous liquids, this tank is unique because it also contains a layer of degraded PUREX solvent floating on the aqueous liquid. The following three options for removing and storing this separable phase organic solvent have been proposed and studied: transferring the organic solvent and pumpable aqueous liquids using existing salt well pumping equipment and procedures to a double-shell tank (DST) for storage; removing most of the organic solvent using a skimmer pump, then salt well pumping the remaining pumpable liquids to a different DST for storage; removing most of the organic solvent to an aboveground storage tank for eventual treatment or offsite transfer, and then salt well pumping the remaining pumpable liquids to a DST for interim storage. As a result of evaluating these three options and a no pumping option, the recommended action is to transfer both the organic solvent and pumpable aqueous liquid to a DST for storage using existing salt well pumping equipment. The evaluation considers the following criteria: public health and safety, worker safety, environmental compliance, engineering feasibility, and cost. The options compared these factors. Two key areas drove the selection of the recommended approach: the minimization of potential soil contamination from tank leaks caused the (interim stabilization by salt well pumping) options to be rated more highly than the no pumping option; and cost and implementation factors caused the transfer and storage to DST using existing tank farm salt well pumping equipment option to rate higher than the skimming options. Other factors have only a second order effect on the selection process. Evaluation results are described in this report.

  2. Toxicological evaluation of clay minerals and derived nanocomposites: a review.

    PubMed

    Maisanaba, Sara; Pichardo, Silvia; Puerto, María; Gutiérrez-Praena, Daniel; Cameán, Ana M; Jos, Angeles

    2015-04-01

    Clays and clay minerals are widely used in many facets of our society. This review addresses the main clays of each phyllosilicate groups, namely, kaolinite, montmorillonite (Mt) and sepiolite, placing special emphasis on Mt and kaolinite, which are the clays that are more frequently used in food packaging, one of the applications that are currently exhibiting higher development. The improvements in the composite materials obtained from clays and polymeric matrices are remarkable and well known, but the potential toxicological effects of unmodified or modified clay minerals and derived nanocomposites are currently being investigated with increased interest. In this sense, this work focused on a review of the published reports related to the analysis of the toxicological profile of commercial and novel modified clays and derived nanocomposites. An exhaustive review of the main in vitro and in vivo toxicological studies, antimicrobial activity assessments, and the human and environmental impacts of clays and derived nanocomposites was performed. From the analysis of the scientific literature different conclusions can be derived. Thus, in vitro studies suggest that clays in general induce cytotoxicity (with dependence on the clay, concentration, experimental system, etc.) with different underlying mechanisms such as necrosis/apoptosis, oxidative stress or genotoxicity. However, most of in vivo experiments performed in rodents showed no clear evidences of systemic toxicity even at doses of 5000mg/kg. Regarding to humans, pulmonary exposure is the most frequent, and although clays are usually mixed with other minerals, they have been reported to induce pneumoconiosis per se. Oral exposure is also common both intentionally and unintentionally. Although they do not show a high toxicity through this pathway, toxic effects could be induced due to the increased or reduced exposure to mineral elements. Finally, there are few studies about the effects of clay minerals on

  3. Compilation of interim technical research memoranda. Volume I

    SciTech Connect

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields.

  4. Prognostic value of interim and restaging PET/CT in Hodgkin lymphoma. Results of the CHEAP (Chemotherapy Effectiveness Assessment by PET/CT) study - long term observation.

    PubMed

    Miltenyi, Z; Barna, S; Garai, I; Simon, Z; Jona, A; Magyari, F; Gergely, M; Nagy, Z; Keresztes, K; Pettendi, P; Illes, A

    2015-01-01

    Very few studies have determined the prognostic value of interim and restaging PET/CT in patients with Hodgkin lymphoma using current standard of care therapy outside clinical trials. We analyzed the effect of the results of interim and restaging PET/CT on the survival (overall- and relapse-free) in patients who received standard first-line treatment based on the stage of disease and risk factors. We investigated the differences between the relapse and non-relapse groups based on the clinical pathological characteristics of patients who had positive interim PET/CT results.Between January 1, 2007 and December 31, 2011, the staging, interim and restaging PET/CT scans of patients with Hodgkin lymphoma were analyzed. The Deauville criteria were used for the evaluation of interim PET/CT scans. One hundred and thirteen Hodgkin lymphoma patients underwent staging, interim and restaging PET/CT scans. None of the therapy was modified based on the interim PET/CT results. The median follow-up time was 43.5 months. A total of 62 early stage patients and 51 advanced stage patients were identified. The five-year overall survival rates were 93.4% in the interim PET negative group and 58% in the interim PET positive group (p<0.001). The five-year relapse-free survival rates for the negative and positive groups were 92.7% and 40.8%, respectively (p<0.001). The negative predictive value was 100% in the early stage group and 82.35% in the advanced stage group. By comparison, the positive predictive values were 53.8% and 58.8%, respectively, in these two groups. In the interim PET positive group, patients over 40 years of age had a significantly higher probability of relapse (p=0.057).The routine clinical use of interim PET/CT is highly recommended based on our investigation. However, patients with positive interim PET/CT results required frequent additional evaluations.

  5. The Know Your Body program: a review of evaluation studies.

    PubMed Central

    Resnicow, K.; Cross, D.; Wynder, E.

    1993-01-01

    Know Your Body is a comprehensive school health promotion program for kindergarten through six grades, initially developed in the 1970s by the American Health Foundation. The impact of the KYB program has been evaluated in three field trials, the results of which have been reviewed in this article. Across the three studies, at 3-year follow-up, consistent positive intervention effects were reported for systolic blood pressure, diastolic blood pressure, smoking, HDL-cholesterol, and health knowledge. Results for total blood cholesterol, fitness score, heart-healthy snacks, fruit/vegetable intake, whole milk intake, and health attitudes were mixed. For body mass index, triceps skinfold, all remaining dietary variables, self-esteem/self-efficacy, and locus of control no significant effects were observed. Overall, significant treatment effects were reported for 19 of the 40 variables assessed at 3-year follow-up, an effects ratio of 48%. Consistent positive results at 5-year follow-up were reported for smoking and health knowledge. Mixed results were obtained for total blood cholesterol, diastolic blood pressure, and percent kilocalories from saturated fat. Consistent null results were reported for HDL-cholesterol, systolic blood pressure, body mass index, triceps skinfold, fitness score, percentage kilocalories from fat, cholesterol intake, and fiber intake. Overall, significant treatment effects were reported for 7 of 36 variables at 5-year follow-up, an effects ratio of 19%. Although reported program effects were largely mixed, they seem consistent with other health education evaluations. Null results may have been related to insufficient teacher implementation as well as weaknesses in design and assessment. Additional research is needed to determine the effect of the program on a broader range of outcomes, to what degree increasing the "dose" produces larger and more enduring treatment effects, and the relative impact of the various components that comprise the

  6. Evaluation for citation metrics and peer reviewer acknowledgments

    PubMed Central

    Green, Bart N.

    2016-01-01

    This editorial discusses the indexing systems that include the Journal of Chiropractic Education, reflects on the increased international participation in chiropractic education scholarly meetings and peer review, and acknowledges the editorial board and peer reviewers for the journal. PMID:27557431

  7. The Young Adult Book Review Media: An Evaluation.

    ERIC Educational Resources Information Center

    Locker, Linda S.

    This study examines eight reviewing tools which include reviews for young adult (YA) books. The following journals are examined to determine scope, coverage, analysis of content, and reviewing policies: "Booklist,""School Library Journal,""Horn Book Magazine,""Wilson Library Bulletin,""Voice of Youth…

  8. School feeding in Jamaica: a review of its evaluation.

    PubMed

    Simeon, D T

    1998-04-01

    This paper reviews two studies that evaluated the school feeding program in Jamaica. The first examined 115 children aged 12-13 y who were enrolled in three classes in a poor, rural school. One class was served the standard school meal at 0900 whereas the other two classes served as controls. The outcome variables included school achievement, attendance, and weight gain. After one semester, the class receiving the meal showed improved arithmetic scores and school attendance compared with the control classes; however, they showed no weight gain. The academic improvement remained significant after school attendance was controlled for. It was therefore hypothesized that the gains in arithmetic resulted from the alleviation of hunger in the classroom. The other study, conducted in a metabolic ward, examined the effects of missing breakfast on cognitive function in 90 children aged 9-10 y and of differing nutritional status. Using a crossover design, the investigators tested each child on two mornings 1 wk apart, once after serving them breakfast and second without. Breakfast, consisting of the school program meal, was served at 0800. When severely malnourished, stunted, or wasted children received no breakfast, their performance in various cognitive tests deteriorated. These results indicate that alleviation of hunger was one of the mechanisms by which school feeding improved academic achievement in the previous study. Undernourished children are more likely to benefit from school feeding programs than are adequately nourished children.

  9. Techniques to Evaluate Dental Erosion: A Systematic Review of Literature.

    PubMed

    Joshi, Mahasweta; Joshi, Nikhil; Kathariya, Rahul; Angadi, Prabhakar; Raikar, Sonal

    2016-10-01

    This article reviews different techniques for evaluating dental erosion, weighs the advantages and disadvantages of these techniques, and presents the latest trends in the study of dental erosion. In May 2014, an initial search was carried out in the PubMed/MEDLINE database of indexed journals from 1975 to 2013 using the following keywords: dental erosion; dental erosion In-vitro; and dental erosion in-vivo. Bibliographic citations from the papers found were then used to find other useful sources. The authors categorize the techniques into three classes: in-vitro, in-vivo and in-vitro/in-vivo. The article discusses the instrumentation required to use each of these techniques, as well as their rationale, merits and applications. The emergence of in-vitro/in-vivo techniques offers the potential to accurately quantify tooth wear in clinical situations. Cross-sectional as well as longitudinal studies show that these techniques will improve diagnosis, treatment planning and management of dental erosion.

  10. Techniques to Evaluate Dental Erosion: A Systematic Review of Literature

    PubMed Central

    Joshi, Mahasweta; Joshi, Nikhil; Angadi, Prabhakar; Raikar, Sonal

    2016-01-01

    This article reviews different techniques for evaluating dental erosion, weighs the advantages and disadvantages of these techniques, and presents the latest trends in the study of dental erosion. In May 2014, an initial search was carried out in the PubMed/MEDLINE database of indexed journals from 1975 to 2013 using the following keywords: dental erosion; dental erosion In-vitro; and dental erosion in-vivo. Bibliographic citations from the papers found were then used to find other useful sources. The authors categorize the techniques into three classes: in-vitro, in-vivo and in-vitro/in-vivo. The article discusses the instrumentation required to use each of these techniques, as well as their rationale, merits and applications. The emergence of in-vitro/in-vivo techniques offers the potential to accurately quantify tooth wear in clinical situations. Cross-sectional as well as longitudinal studies show that these techniques will improve diagnosis, treatment planning and management of dental erosion. PMID:27891489

  11. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    SciTech Connect

    Bryan, Charles R.; Enos, David G.

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  12. Radiation therapy for nasopharyngeal carcinoma: the predictive value of interim survival assessment.

    PubMed

    Toya, Ryo; Murakami, Ryuji; Saito, Tetsuo; Murakami, Daizo; Matsuyama, Tomohiko; Baba, Yuji; Nishimura, Ryuichi; Hirai, Toshinori; Semba, Akiko; Yumoto, Eiji; Yamashita, Yasuyuki; Oya, Natsuo

    2016-09-01

    Pretreatment characteristics are suggested as predictive and/or prognostic factors for nasopharyngeal carcinoma (NPC); however, individual tumor radiosensitivities have previously not been considered. As boost planning is recommended for NPC, we performed interim assessments of magnetic resonance (MR) images for boost planning and retrospectively evaluated their predictive value for the survival of NPC patients. Radiation therapy via elective nodal irradiation (median dose: 39.6 Gy) with/without chemotherapy was used to treat 63 NPC patients. Boost irradiation (median total dose: 70 Gy) was performed based on the interim assessment. The largest lymph node (LN) was measured on MR images acquired at the time of interim assessment. The site of first failure was local in 8 (12.7%), regional in 7 (11.1%), and distant in 12 patients (19.0%). All 7 patients with regional failure harbored LNs ≥15 mm at interim assessment. We divided the 63 patients into two groups based on LN size [large (≥15 mm), n = 10 and small (<15 mm), n = 53]. Univariate analysis showed that 5-year overall survival (OS) and cause-specific survival (CSS) rates for large LNs were significantly lower than for small LNs (OS: 12.5% vs 70.5%, P < 0.001 and CSS: 25.0% vs 80.0%, P < 0.001). Multivariate analysis showed that large LNs were a significantly unfavorable factor for both OS (hazard ratio = 4.543, P = 0.002) and CSS (hazard ratio = 6.020, P = 0.001). The results suggest that LN size at interim assessment could predict survival in NPC patients.

  13. An Aging Interventions Testing Program: study design and interim report.

    PubMed

    Miller, Richard A; Harrison, David E; Astle, Clinton M; Floyd, Robert A; Flurkey, Kevin; Hensley, Kenneth L; Javors, Martin A; Leeuwenburgh, Christiaan; Nelson, James F; Ongini, Ennio; Nadon, Nancy L; Warner, Huber R; Strong, Randy

    2007-08-01

    The National Institute on Aging's Interventions Testing Program (ITP) has developed a plan to evaluate agents that are considered plausible candidates for delaying rates of aging. Key features include: (i) use of genetically heterogeneous mice (a standardized four-way cross), (ii) replication at three test sites (the Jackson Laboratory, TJL; University of Michigan, UM; and University of Texas, UT), (iii) sufficient statistical power to detect 10% changes in lifespan, (iv) tests for age-dependent changes in T cell subsets and physical activity, and (v) an annual solicitation for collaborators who wish to suggest new interventions for evaluation. Mice in the first cohort were exposed to one of four agents: aspirin, nitroflurbiprofen (NFP), 4-OH-alpha-phenyl-N-tert-butyl nitrone (4-OH-PBN), or nordihydroguiaretic acid (NDGA). An interim analysis was conducted using survival data available on the date at which at least 50% of the male control mice had died at each test site. Survival of control males was significantly higher, at the interim time-point, at UM than at UT or TJL; all three sites had similar survival of control females. Males in the NDGA group had significantly improved survival (P = 0.0004), with significant effects noted at TJL (P < 0.01) and UT (P < 0.04). None of the other agents altered survival, although there was a suggestion (P = 0.07) of a beneficial effect of aspirin in males. More data will be needed to determine if any of these compounds can extend maximal lifespan, but the current data show that NDGA reduces early life mortality risks in genetically heterogeneous mice at multiple test sites.

  14. 78 FR 30303 - National Contact Center; Submission for OMB Review; National Contact Center Customer Evaluation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... ADMINISTRATION National Contact Center; Submission for OMB Review; National Contact Center Customer Evaluation Survey AGENCY: Contact Center Services, Federal Citizen Information Center, Office of Citizen Services... requirement regarding the National Contact Center customer evaluation surveys. In this request, the...

  15. An Evaluative Review of Simulated Dynamic Smart 3d Objects

    NASA Astrophysics Data System (ADS)

    Romeijn, H.; Sheth, F.; Pettit, C. J.

    2012-07-01

    Three-dimensional (3D) modelling of plants can be an asset for creating agricultural based visualisation products. The continuum of 3D plants models ranges from static to dynamic objects, also known as smart 3D objects. There is an increasing requirement for smarter simulated 3D objects that are attributed mathematically and/or from biological inputs. A systematic approach to plant simulation offers significant advantages to applications in agricultural research, particularly in simulating plant behaviour and the influences of external environmental factors. This approach of 3D plant object visualisation is primarily evident from the visualisation of plants using photographed billboarded images, to more advanced procedural models that come closer to simulating realistic virtual plants. However, few programs model physical reactions of plants to external factors and even fewer are able to grow plants based on mathematical and/or biological parameters. In this paper, we undertake an evaluation of plant-based object simulation programs currently available, with a focus upon the components and techniques involved in producing these objects. Through an analytical review process we consider the strengths and weaknesses of several program packages, the features and use of these programs and the possible opportunities in deploying these for creating smart 3D plant-based objects to support agricultural research and natural resource management. In creating smart 3D objects the model needs to be informed by both plant physiology and phenology. Expert knowledge will frame the parameters and procedures that will attribute the object and allow the simulation of dynamic virtual plants. Ultimately, biologically smart 3D virtual plants that react to changes within an environment could be an effective medium to visually represent landscapes and communicate land management scenarios and practices to planners and decision-makers.

  16. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    DTIC Science & Technology

    2016-09-16

    Spending Under an Interim Continuing Resolution (CR): In Brief Congressional Research Service 2 example, the first FY2016 CR provided that funding be...Congressional Research Service 4 apportioning funds for personnel compensation and benefits at a higher rate for operations, albeit with some restrictions. 9...ramping down development activities and transitioning into production could be allocated research , development, test and evaluation (RDT&E) funding

  17. Interim-Night Integrated Goggle Head Tracking System (I-Nights). Volume 1. Ground Test Summary

    DTIC Science & Technology

    1992-08-01

    3 Figure 2. Honeywell I-NIGHTS System Drawing . . . . . . . . 4 Figure 3. Kaiser I-NIGHTS System Drawing . . . . . . . . . . 5 Figure 4. Spinal ...thoracolumbar spinal fracture during ejection seat use. The USAF use of the DRI to evaluate ejection seats is embodied in Military Specification: Seat Systems...probability of spinal injury. But, what WT/CG/force combinations are reasonably acceptable during ejection? The I-NIGHTS program helped establish an interim

  18. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... Report and Order in MM Docket No. 99-325, as revised in the Media Bureau's subsequent Order in MM...

  19. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  20. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  1. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  2. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  3. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  4. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder....

  5. 45 CFR 1606.13 - Interim and termination funding; reprogramming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim and termination funding; reprogramming. 1606.13 Section 1606.13 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION TERMINATION AND DEBARMENT PROCEDURES; RECOMPETITION § 1606.13 Interim and...

  6. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  7. 16 CFR 1203.53 - Interim safety standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Interim safety standards. 1203.53 Section 1203.53 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS..., Through March 10, 1999 § 1203.53 Interim safety standards. (a) Bicycle helmets must comply with one...

  8. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amounts insured under interim binder. 308.303 Section 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The...

  9. Optimal timing for interim analyses in clinical trials.

    PubMed

    Togo, Kanae; Iwasaki, Manabu

    2013-01-01

    In clinical trials, interim analyses are often performed before the completion of the trial. The intention is to possibly terminate the trial early or adjust the sample size. The time of conducting an interim analysis affects the probability of the early termination and the number of subjects enrolled until the interim analysis. This influences the expected total number of subjects. In this study, we examine the optimal time for conducting interim analyses with a view to minimizing the expected total sample size. It is found that regardless of the effect size, the optimal time of one interim analysis for the early termination is approximately two-thirds of the planned observations for the O'Brien-Fleming type of spending function and approximately half of the planned observations for the Pocock type when the subject enrollment is halted for the interim analysis. When the subject enrollment is continuous throughout the trial, the optimal time for the interim analysis varies according to the follow-up duration. We also consider the time for one interim analysis including the sample size adjustment in terms of minimizing the expected total sample size.

  10. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  11. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Interim disaster procedures. 280.1 Section 280.1 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF....1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  12. 40 CFR 281.23 - Schedule for interim approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Schedule for interim approval. 281.23 Section 281.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Schedule for interim approval. For a state program that must modify its statutory or...

  13. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a... shall provide transport and termination of telecommunications traffic immediately under an...

  14. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew; Cooper, Robyn; Ebbers, Larry

    2012-01-01

    The purpose of this case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this study: 1. How do two interim community college presidents lead community colleges during a…

  15. The Predictive and Instructional Value of Interim Assessments

    ERIC Educational Resources Information Center

    Pon, Kathleen

    2013-01-01

    This mixed design study investigated the predictive and instructional uses of two different types of interim mathematics assessments given in two different districts. One district administered the same summative type of assessment three times a year, while the other district administered a different interim assessment after six-week intervals of…

  16. 40 CFR 270.64 - Interim permits for UIC wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Interim permits for UIC wells. 270.64 Section 270.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 270.64 Interim permits for UIC wells. The Director may issue a permit under this part to any Class...

  17. 46 CFR 308.103 - Insured amounts under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Insured amounts under interim binder. 308.103 Section 308.103 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Hull and Disbursements Insurance § 308.103 Insured amounts under interim binder....

  18. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Periodic interim payments. 418.307 Section 418.307... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic...

  19. 39 CFR 211.4 - Interim personnel regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION APPLICATION OF REGULATIONS § 211.4 Interim personnel regulations. (a) Continuation of Personnel Regulations of the Post...

  20. Statistical Profile of Children and Mothers in Afghanistan. Interim Edition.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This interim report is an updating of the 1977 Statistical Profile of Children and Mothers in Afghanistan. The interim report reflects the significant changes in policies brought about by the Saur Revolution establishing the Democratic Republic of Afghanistan in 1978. A comprehensive revision of the report is expected when the new government's…

  1. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  2. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  3. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  4. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  5. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  6. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  7. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Interim service under this paragraph (a) is not... percent of which consists of accessible buses (e.g., a small fixed-route operator who exclusively...

  8. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  9. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  10. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  11. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY... requirements and their effective date. PHMSA may issue an interim final rule if it finds, for good cause, that... comments, as well as any other relevant documents, PHMSA may revise the interim final rule and then issue...

  12. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives...

  13. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives...

  14. Augmented Reality Mentor for Training Maintenance Procedures: Interim Assessment

    DTIC Science & Technology

    2014-08-01

    ARI Research Note 2014-04 Augmented Reality Mentor for Training Maintenance Procedures: Interim Assessment Louise...2014 4. TITLE AND SUBTITLE Augmented Reality Mentor for Training Maintenance Procedures: Interim Assessment 5a. CONTRACT OR GRANT NUMBER...Representative and Subject Matter POC: Dr. William R. Bickley 14. ABSTRACT (Maximum 200 words): The Augmented Reality Mentor is a 2-yr advanced

  15. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After...

  16. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After...

  17. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments. Subject to the provisions of § 413.64(h) of this chapter, a hospice may elect to receive periodic interim... PIP method unless the hospice requests a longer fixed interval (not to exceed one month)...

  18. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  19. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  20. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... filed with the interim financial statements. Interim financial statements shall include a balance sheet as of the end of the issuer's most recent fiscal quarter, a balance sheet as of the end of the... date of such balance sheet and the comparable period of the preceding fiscal year. (a) Condensed...

  1. Comparison of fiber reinforcement placed at different locations of pontic in interim fixed partial denture to prevent fracture: An in vitro study

    PubMed Central

    Kapri, Surg Cdr Anita

    2015-01-01

    Background: The interim restoration is an important phase in fixed prosthodontic therapy. It should provide sufficient durability to withstand the forces of mastication. A fractured interim restoration is damaging to the prosthodontic care and may lead to an unscheduled appointment for repair. Several attempts have been made to reinforce interim fixed partial dentures (FPDs). These have included the use of metal wire, a lingual cast metal reinforcement, a processed acrylic resin interim restoration, and different types of fibers, e.g., carbon, polyethylene, nylon and glass. These fibers can be placed in the occlusal, middle or cervical thirds in the FPD. There is no scientific data to evaluate the effect of fiber placement methods on the fracture resistance of clinical interim FPDs. Purpose of the Study: Hence this study was designed to evaluate fracture load values of interim FPDs with different locations of fiber reinforcement. Materials and Methods: 30 interim FPD samples with polymethyl methacrylate (PMMA) reinforced with fibers at three different locations mainly occlusal, cervical and middle (10 samples each) were fabricated using a metal FPD on a master die. They were tested for fracture resistance in universal testing machine. Results: The fracture resistance was recorded and is tabulated and analyzed statistically. The results showed that the placement of the reinforcement in the occlusal third of the pontic resulted in higher fracture resistance which was significantly higher (P < 0.05) than all other locations. Conclusion: The occlusal third of the pontic region from mesial to the distal end of the connector is the best site of placement of the fiber for reinforcing the PMMA interim restorative resin. PMID:26929501

  2. Evaluation of the Service Review Model with Performance Scorecards

    ERIC Educational Resources Information Center

    Szabo, Thomas G.; Williams, W. Larry; Rafacz, Sharlet D.; Newsome, William; Lydon, Christina A.

    2012-01-01

    The current study combined a management technique termed "Service Review" with performance scorecards to enhance staff and consumer behavior in a human service setting consisting of 11 supervisors and 56 front-line staff working with 9 adult consumers with challenging behaviors. Results of our intervention showed that service review and…

  3. The National Evaluation of School Nutrition Programs. Review of Research: Volume 1.

    ERIC Educational Resources Information Center

    Nelson, Kathryn, Ed.; And Others

    Findings of a review of research pertaining to federally subsidized school nutrition programs are presented in this report. The review of research, the first phase of the National Evaluation of School Nutrition Programs, is intended to provide guidance for the design of subsequent evaluation (including student, parent, and food administrator…

  4. Evaluation in Moves: An Integrated Analysis of Chinese MA Thesis Literature Reviews

    ERIC Educational Resources Information Center

    Xie, Jianping

    2017-01-01

    The ultimate communicative purpose of literature reviews is to convince the reader of the worthiness of the writer's research, which is realized stage by stage and evaluation plays an important role in achieving this end. However, concerns about evaluation demonstration in novice academic writers' literature reviews have been repeatedly voiced in…

  5. 33 CFR 116.30 - Chief, Office of Bridge Programs Review and Evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Programs Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from a District... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Chief, Office of Bridge Programs Review and Evaluation. 116.30 Section 116.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT...

  6. 33 CFR 116.30 - Chief, Office of Bridge Programs Review and Evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Programs Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from a District... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Chief, Office of Bridge Programs Review and Evaluation. 116.30 Section 116.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT...

  7. Evaluating the implementation of environmental review mitigation in local planning and development processes

    SciTech Connect

    Slotterback, Carissa Schively

    2008-11-15

    The implementation of mitigation strategies and outcomes of environmental review remains a challenge for planners and regulators. While the process and content of environmental review is clearly defined, there is often little attention to what happens after the review is completed. This paper presents the results of an evaluation of the implementation of the outcomes of environmental review, specifically mitigation measures designed to respond to environmental impacts identified in the environmental impact analysis. Drawing on previous evaluations of environmental review outcomes and plan implementation, the research provides a methodology for evaluating the implementation of mitigation efforts, points to the challenges associated with implementing the mitigation outcomes of local environmental review in planning and development processes, and identifies opportunities to integrate planning and environmental review processes.

  8. Central waste complex interim safety basis

    SciTech Connect

    Cain, F.G.

    1995-05-15

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

  9. DOE Hydrogen Program: 2005 Annual Merit Review and Peer Evaluation Report

    SciTech Connect

    Chalk, S. G.

    2005-09-01

    This report summarizes comments from the Peer Review Panel at the FY 2005 DOE Hydrogen Program Annual Merit Review, held on May 23-26, 2005, in Arlington, Virginia. The projects evaluated support the Department of Energy and President Bush's Hydrogen Initiative. The results of this merit review and peer evaluation are major inputs used by DOE to make funding decisions. Project areas include hydrogen production and delivery; hydrogen storage; fuel cells; technology validation; safety, codes and standards; education; and systems analysis.

  10. DOE Hydrogen Program: 2006 Annual Merit Review and Peer Evaluation Report

    SciTech Connect

    Milliken, J.

    2006-09-01

    This report summarizes comments from the Peer Review Panel at the FY 2006 DOE Hydrogen Program Annual Merit Review, held on May 16-19, 2006, in Arlington, Virginia. The projects evaluated support the Department of Energy and President Bush's Hydrogen Initiative. The results of this merit review and peer evaluation are major inputs used by DOE to make funding decisions. Project areas include hydrogen production and delivery; hydrogen storage; fuel cells; technology validation; safety, codes and standards; education; and systems analysis.

  11. 50 CFR 259.30 - Application for Interim Capital Construction Fund Agreement (“Interim CCF Agreement”).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Application for Interim Capital Construction Fund Agreement (âInterim CCF Agreementâ). 259.30 Section 259.30 Wildlife and Fisheries NATIONAL... FISHERIES CAPITAL CONSTRUCTION FUND Capital Construction Fund Agreement § 259.30 Application for...

  12. Evaluating the agreement between measurements and models of net ecosystem exchange at different times and time scales using wavelet coherence: an example using data from the North American Carbon Program Site-Level Interim Synthesis

    NASA Astrophysics Data System (ADS)

    Stoy, P. C.; Dietze, M.; Richardson, A. D.; Vargas, R.; Barr, A. G.; Anderson, R. S.; Arain, M. A.; Baker, I. T.; Black, T. A.; Chen, J. M.; Cook, R. B.; Gough, C. M.; Grant, R. F.; Hollinger, D. Y.; Izaurralde, R. C.; Kucharik, C. J.; Lafleur, P.; Law, B. E.; Liu, S.; Lokupitiya, E.; Luo, Y.; Munger, J. W.; Peng, C.; Poulter, B.; Price, D. T.; Ricciuto, D. M.; Riley, W. J.; Sahoo, A. K.; Schaefer, K.; Schwalm, C. R.; Tian, H.; Verbeeck, H.; Weng, E.

    2013-02-01

    Earth system processes exhibit complex patterns across time, as do the models that seek to replicate these processes. Model output may or may not be significantly related to observations at different times and on different frequencies. Conventional model diagnostics provide an aggregate view of model-data agreement, but usually do not identify the time and frequency patterns of model misfit, leaving unclear the steps required to improve model response to environmental drivers that vary on characteristic frequencies. Wavelet coherence can quantify the times and frequencies at which models and measurements are significantly different. We applied wavelet coherence to interpret the predictions of twenty ecosystem models from the North American Carbon Program (NACP) Site-Level Interim Synthesis when confronted with eddy covariance-measured net ecosystem exchange (NEE) from ten ecosystems with multiple years of available data. Models were grouped into classes with similar approaches for incorporating phenology, the calculation of NEE, and the inclusion of foliar nitrogen (N). Models with prescribed, rather than prognostic, phenology often fit NEE observations better on annual to interannual time scales in grassland, wetland and agricultural ecosystems. Models that calculate NEE as net primary productivity (NPP) minus heterotrophic respiration (HR) rather than gross ecosystem productivity (GPP) minus ecosystem respiration (ER) fit better on annual time scales in grassland and wetland ecosystems, but models that calculate NEE as GPP - ER were superior on monthly to seasonal time scales in two coniferous forests. Models that incorporated foliar nitrogen (N) data were successful at capturing NEE variability on interannual (multiple year) time scales at Howland Forest, Maine. Combined with previous findings, our results suggest that the mechanisms driving daily and annual NEE variability tend to be correctly simulated, but the magnitude of these fluxes is often erroneous

  13. Evaluating the agreement between measurements and models of net ecosystem exchange at different times and timescales using wavelet coherence: an example using data from the North American Carbon Program Site-Level Interim Synthesis

    NASA Astrophysics Data System (ADS)

    Stoy, P. C.; Dietze, M. C.; Richardson, A. D.; Vargas, R.; Barr, A. G.; Anderson, R. S.; Arain, M. A.; Baker, I. T.; Black, T. A.; Chen, J. M.; Cook, R. B.; Gough, C. M.; Grant, R. F.; Hollinger, D. Y.; Izaurralde, R. C.; Kucharik, C. J.; Lafleur, P.; Law, B. E.; Liu, S.; Lokupitiya, E.; Luo, Y.; Munger, J. W.; Peng, C.; Poulter, B.; Price, D. T.; Ricciuto, D. M.; Riley, W. J.; Sahoo, A. K.; Schaefer, K.; Schwalm, C. R.; Tian, H.; Verbeeck, H.; Weng, E.

    2013-11-01

    Earth system processes exhibit complex patterns across time, as do the models that seek to replicate these processes. Model output may or may not be significantly related to observations at different times and on different frequencies. Conventional model diagnostics provide an aggregate view of model-data agreement, but usually do not identify the time and frequency patterns of model-data disagreement, leaving unclear the steps required to improve model response to environmental drivers that vary on characteristic frequencies. Wavelet coherence can quantify the times and timescales at which two time series, for example time series of models and measurements, are significantly different. We applied wavelet coherence to interpret the predictions of 20 ecosystem models from the North American Carbon Program (NACP) Site-Level Interim Synthesis when confronted with eddy-covariance-measured net ecosystem exchange (NEE) from 10 ecosystems with multiple years of available data. Models were grouped into classes with similar approaches for incorporating phenology, the calculation of NEE, the inclusion of foliar nitrogen (N), and the use of model-data fusion. Models with prescribed, rather than prognostic, phenology often fit NEE observations better on annual to interannual timescales in grassland, wetland and agricultural ecosystems. Models that calculated NEE as net primary productivity (NPP) minus heterotrophic respiration (HR) rather than gross ecosystem productivity (GPP) minus ecosystem respiration (ER) fit better on annual timescales in grassland and wetland ecosystems, but models that calculated NEE as GPP minus ER were superior on monthly to seasonal timescales in two coniferous forests. Models that incorporated foliar nitrogen (N) data were successful at capturing NEE variability on interannual (multiple year) timescales at Howland Forest, Maine. The model that employed a model-data fusion approach often, but not always, resulted in improved fit to data, suggesting

  14. Evaluation and Statistical Review of Idaho Supplementation Studies :1991-2001.

    SciTech Connect

    Lutch, Jeffrey; Steinhorst, Kirk; Beasley, Chris

    2003-03-01

    The Idaho Supplementation Studies (ISS) was developed to evaluate the utility of supplementation as a recovery tool for Snake River basin chinook salmon (Supplementation Technical Workgroup 1987), and to help define the potential role of supplementation in managing Idaho's anadromous fisheries (IDFG 1990; IDFG 1992). Supplementation as defined by the Regional Assessment of Supplementation Project group is the use of artificial propagation in the attempt to maintain or increase natural production while maintaining the long-term fitness of the target population (RASP 1992). Poor survival has led to the decline and continued depression of upriver chinook salmon stocks due to mainstem passage and mortality factors associated with the lower Snake and Columbia river dams. Although immediate efforts should focus on alleviating the poor passage and flow conditions, supplementation may concurrently be a viable tool to meet the Northwest Power Planning Council's interim goal of doubling anadromous fish runs in the Columbia River Basin (NPPC 1987) and avoiding short-term loss of spawning aggregates.

  15. Medicare: Better Controls Needed for Peer Review Organizations’ Evaluations.

    DTIC Science & Technology

    1987-10-01

    Peer Review Organizations’ performance during the 1984-86 contract period. It also discusses HCFA’S process for determining program funding for the 1986-88 contract period. The report contains recommendations to the Secretary of Health and Human Services. Professional Review Organizations (PROS) contract with the Medicare program to review the necessity, appropriateness, and quality of inpatient hospital services received by the program’s beneficiaries. From February through July 1986, the Department of Health and Human Services’ (HHS’S) Health

  16. Review of Building Quality Using Post Occupancy Evaluation.

    ERIC Educational Resources Information Center

    Watson, Chris

    2003-01-01

    Describes post-occupancy evaluation of school buildings in terms of its aims, principles, benefits, methods, timing, and results. Offers three examples illustrating the evaluation of educational facilities in New Zealand. (EV)

  17. Evaluating Training and Educational Programs: A Review of the Literature

    DTIC Science & Technology

    1992-10-01

    formulate better strategies for evaluating large programs ( Stufflebeam , Foley, Gephart, Guba, Hammond, Merriman, & Provus, 1971). During this period the U.S...report, Educational Evaluation and Decision Making ( Stufflebeam , et al., 1971), combined with information excerpted from more recent publications...and lack of enthusiasm for program evaluation ( Stufflebeam , et al., 1971, p. 4-9). Recently published work in evaluation research indicates that many of

  18. Evaluating Student Papers: The Case for Peer Review.

    ERIC Educational Resources Information Center

    Marcoulides, George; Simkin, Mark G.

    1991-01-01

    A preprinted evaluation form and generalizability theory were used to judge the reliability of student grading of their peers' papers. Findings suggest that students can be consistent and fair in their assessments. Student practice in peer evaluation will help develop the management skill of employee evaluation. (JOW)

  19. Hydrograph separation using stable isotopes: Review and evaluation

    NASA Astrophysics Data System (ADS)

    Klaus, J.; McDonnell, J. J.

    2013-11-01

    We reviewed isotope hydrograph separation studies.We examine methods, applications, and limitations.We summarize factors that control the event/pre-event water contributions.We outline new possible research avenues in isotope hydrograph separation.

  20. 42 CFR 441.365 - Periodic evaluation, assessment, and review.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... State government (such as the Department of Health or the Agency on Aging). (2) Each review team must... occurred at least every 30 days. (3) Whether tests or observations of each recipient indicated by his...