Sample records for evaluation mitigation plan

  1. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  2. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  3. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  4. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  5. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  6. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, Matthew T.; Judd, Steven L.

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  7. 300 Area Building Retention Evaluation Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  8. Wetland Mitigation Monitoring at the Fernald Preserve - 13200

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Jane; Bien, Stephanie; Decker, Ashlee

    The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluatedmore » from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)« less

  9. A public health hazard mitigation planning process.

    PubMed

    Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J

    2014-01-01

    The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.

  10. Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Robert C.

    1988-08-01

    A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's,more » 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.« less

  11. Evaluating fuel complexes for fire hazard mitigation planning in the southeastern United States

    Treesearch

    Anne G. Andreu; Dan Shea; Bernard R. Parresol; Roger D. Ottmar

    2012-01-01

    Fire hazard mitigation planning requires an accurate accounting of fuel complexes to predict potential fire behavior and effects of treatment alternatives. In the southeastern United States, rapid vegetation growth coupled with complex land use history and forest management options requires a dynamic approach to fuel characterization. In this study we assessed...

  12. Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DosSantos, Joe; Vashro, Jim; Lockard, Larry

    1994-06-01

    In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull troutmore » redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.« less

  13. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  14. 75 FR 13125 - Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...

  15. Director, Operational Test and Evaluation FY 2014 Annual Report

    DTIC Science & Technology

    2015-01-01

    Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014

  16. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  17. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    NASA Astrophysics Data System (ADS)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.

  18. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  19. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  20. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  1. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Tribal Mitigation Plans. 201... OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.7 Tribal Mitigation Plans. The Indian Tribal Mitigation Plan is the representation of the Indian tribal government's commitment to...

  2. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  3. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  4. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  5. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  6. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  7. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  8. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  9. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  10. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  11. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  12. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Enhanced State Mitigation..., DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.5 Enhanced State Mitigation Plans. (a) A State with a FEMA approved Enhanced State Mitigation Plan at the time of a disaster...

  13. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  14. Towards Designing an Integrated Architecture for NEO Characterization, Mitigation, Scientific Evaluation, and Resource Utilization

    NASA Technical Reports Server (NTRS)

    Adams, Robert B.; LaPointe, Michael; Wilks, Rod; Allen, Brian

    2009-01-01

    This poster reviews the planning and design for an integrated architecture for characterization, mitigation, scientific evaluation and resource utilization of near earth objects. This includes tracks to observe and characterize the nature of the threat posed by a NEO, and deflect if a significant threat is posed. The observation stack can also be used for a more complete scientific analysis of the NEO.

  15. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  16. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  17. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  18. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan approval..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  19. Accounting for vulnerable populations in rural hazard mitigation plans: results of a survey of emergency managers.

    PubMed

    Horney, Jennifer A; Nguyen, Mai; Cooper, John; Simon, Matthew; Ricchetti-Masterson, Kristen; Grabich, Shannon; Salvesen, David; Berke, Philip

    2013-01-01

    Rural areas of the United States are uniquely vulnerable to the impacts of natural disasters. One possible way to mitigate vulnerability to disasters in rural communities is to have a high-quality hazard mitigation plan in place. To understand the resources available for hazard mitigation planning and determine how well hazard mitigation plans in rural counties meet the needs of vulnerable populations, we surveyed the lead planning or emergency management official responsible for hazard mitigation plans in 96 rural counties in eight states in the Southeastern United States. In most counties, emergency management was responsible for implementing the county's hazard mitigation plan and the majority of counties had experienced a presidentially declared disaster in the last 5 years. Our research findings demonstrated that there were differences in subjective measures of vulnerability (as reported by survey respondents) and objective measures of vulnerability (as determined by US Census data). In addition, although few counties surveyed included outreach to vulnerable groups as a part of their hazard mitigation planning process, a majority felt that their hazard mitigation plan addressed the needs of vulnerable populations "well" or "very well." These differences could result in increased vulnerabilities in rural areas, particularly for certain vulnerable groups.

  20. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  1. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  2. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  3. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  4. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance with... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  5. New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.

    2017-12-01

    The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the five Pacific states will include new sections on tsunami load analysis of structures, and require Tsunami Design Zones based on probabilistic analyses. Guidance for community recovery planning has also been initiated. These new projects are being piloted by some States and will help create guidance for other States in the future.

  6. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    NASA Astrophysics Data System (ADS)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  7. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    PubMed

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  8. Context Effects in Teacher Evaluation.

    ERIC Educational Resources Information Center

    McKenna, Bernard H.

    Meaningful and useful evaluations of teaching and teachers must not only identify and define all the mitigating contexts, but must also account for their influences, both constructive and negative. Among the contextual factors that need to be considered in planning teacher evaluations are: student characteristics; goals, objectives and curriculum…

  9. Environmental Mitigation in Transportation Planning : Case Studies in Meeting SAFETEA-LU Section 6001 Requirements for the FHWA, Office of Planning Environment and Realty

    DOT National Transportation Integrated Search

    1996-12-01

    THIS PROJECT IDENTIFIED TRAFFIC PARAMETERS AND THEIR REQUIRED ACCURACIES FOR CHARACTERIZING TRAFFIC FLOW IN CONVENTIONAL AND NEWER INTELLIGENT TRANSPORTATION SYSTEMS (ITS), OBTAINED STATE-OF-THE-ART DETECTORS AND INSTALLED AND EVALUATED THEM IN THREE...

  10. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less

  11. 76 FR 33327 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ...; State/Local/Tribal Hazard Mitigation Plans AGENCY: Federal Emergency Management Agency, DHS. ACTION... . SUPPLEMENTARY INFORMATION: Collection of Information Title: State/Local/Tribal Hazard Mitigation Plans. Type of... Tribal Hazard Mitigation Plan requirements is to support the administration of FEMA Mitigation grant...

  12. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  13. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  14. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  15. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6 Eligibility... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  16. Research and Evaluations of the Health Aspects of Disasters, Part IX: Risk-Reduction Framework.

    PubMed

    Birnbaum, Marvin L; Daily, Elaine K; O'Rourke, Ann P; Loretti, Alessandro

    2016-06-01

    A disaster is a failure of resilience to an event. Mitigating the risks that a hazard will progress into a destructive event, or increasing the resilience of a society-at-risk, requires careful analysis, planning, and execution. The Disaster Logic Model (DLM) is used to define the value (effects, costs, and outcome(s)), impacts, and benefits of interventions directed at risk reduction. A Risk-Reduction Framework, based on the DLM, details the processes involved in hazard mitigation and/or capacity-building interventions to augment the resilience of a community or to decrease the risk that a secondary event will develop. This Framework provides the structure to systematically undertake and evaluate risk-reduction interventions. It applies to all interventions aimed at hazard mitigation and/or increasing the absorbing, buffering, or response capacities of a community-at-risk for a primary or secondary event that could result in a disaster. The Framework utilizes the structure provided by the DLM and consists of 14 steps: (1) hazards and risks identification; (2) historical perspectives and predictions; (3) selection of hazard(s) to address; (4) selection of appropriate indicators; (5) identification of current resilience standards and benchmarks; (6) assessment of the current resilience status; (7) identification of resilience needs; (8) strategic planning; (9) selection of an appropriate intervention; (10) operational planning; (11) implementation; (12) assessments of outputs; (13) synthesis; and (14) feedback. Each of these steps is a transformation process that is described in detail. Emphasis is placed on the role of Coordination and Control during planning, implementation of risk-reduction/capacity building interventions, and evaluation. Birnbaum ML , Daily EK , O'Rourke AP , Loretti A . Research and evaluations of the health aspects of disasters, part IX: Risk-Reduction Framework. Prehosp Disaster Med. 2016;31(3):309-325.

  17. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less

  18. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  19. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less

  20. A Global Mitigation Hierarchy for Nature Conservation

    PubMed Central

    Bull, Joseph W; Addison, Prue F E; Burgass, Michael J; Gianuca, Dimas; Gorham, Taylor M; Jacob, Céline; Watson, James E M; Wilcox, Chris; Milner-Gulland, E J

    2018-01-01

    Abstract Efforts to conserve biodiversity comprise a patchwork of international goals, national-level plans, and local interventions that, overall, are failing. We discuss the potential utility of applying the mitigation hierarchy, widely used during economic development activities, to all negative human impacts on biodiversity. Evaluating all biodiversity losses and gains through the mitigation hierarchy could help prioritize consideration of conservation goals and drive the empirical evaluation of conservation investments through the explicit consideration of counterfactual trends and ecosystem dynamics across scales. We explore the challenges in using this framework to achieve global conservation goals, including operationalization and monitoring and compliance, and we discuss solutions and research priorities. The mitigation hierarchy's conceptual power and ability to clarify thinking could provide the step change needed to integrate the multiple elements of conservation goals and interventions in order to achieve successful biodiversity outcomes. PMID:29731513

  1. Risk evaluation and mitigation strategies for drugs with abuse liability: public interest, special interest, conflicts of interest, and the industry perspective.

    PubMed

    Wright, Curtis; Schnoll, Sidney; Bernstein, David

    2008-10-01

    Risk evaluation and mitigation strategies (REMS) formerly known as Risk Minimization Action Plans (RiskMAPs) are a regulatory technique for dealing with anticipated risks of new medications and are especially important for new drugs with abuse potential. This paper describes the origin and history of risk-management plans for drugs that might be abused, the proper use of these plans in minimizing the risk to the public, and the special difficulties inherent in managing risks for drugs with abuse potential. Drugs with abuse liability are distinctive since the risks inherent in manufacture and distribution include not only risks to patients prescribed the medications, but also risks to the general public including subgroups in the population not intended to get the drug and who receive no medical benefit from the medication. The crafting of risk-management plans intended to protect nonpatient populations is unique for these products. The content, extent, and level of intensity of these plans affect areas of medical ethics, civil liability, and criminal prosecution. The need for risk-management plans for drugs with abuse liability can potentially act as a deterrent to investment and is a factor in decisions concerning the development of new medications for the treatments of pain, ADHD, anxiety disorders, and addictions. This paper provides a framework for moving the process of REMS development forward and criteria for evaluating the probity and adequacy of such programs.

  2. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  3. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  4. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  5. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less

  7. Tradespace and Affordability - Phase 1

    DTIC Science & Technology

    2013-07-09

    assessment options Cost-effectiveness, risk reduction leverage/ROI, rework avoidance Tool, data, scenario availability Contract Number: H98230-08-D-0171...Prepare FED assessment plans and earned value milestones Try to relate earned value to risk -exposure avoided rather than budgeted cost F. Begin...evaluate and iterate plans and enablers I. Assess readiness for Commitment Review Shortfalls identified as risks and covered by risk mitigation

  8. SU-E-J-15: A Patient-Centered Scheme to Mitigate Impacts of Treatment Setup Error

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, L; Southern Medical University, Guangzhou; Tian, Z

    2014-06-01

    Purpose: Current Intensity Modulated Radiation Therapy (IMRT) is plan-centered. At each treatment fraction, we position the patient to match the setup in treatment plan. Inaccurate setup can compromise delivered dose distribution, and hence leading to suboptimal treatments. Moreover, current setup approach via couch shift under image guidance can correct translational errors, while rotational and deformation errors are hard to address. To overcome these problems, we propose in this abstract a patient-centered scheme to mitigate impacts of treatment setup errors. Methods: In the patient-centered scheme, we first position the patient on the couch approximately matching the planned-setup. Our Supercomputing Online Replanningmore » Environment (SCORE) is then employed to design an optimal treatment plan based on the daily patient geometry. It hence mitigates the impacts of treatment setup error and reduces the requirements on setup accuracy. We have conducted simulations studies in 10 head-and-neck (HN) patients to investigate the feasibility of this scheme. Rotational and deformation setup errors were simulated. Specifically, 1, 3, 5, 7 degrees of rotations were put on pitch, roll, and yaw directions; deformation errors were simulated by splitting neck movements into four basic types: rotation, lateral bending, flexion and extension. Setup variation ranges are based on observed numbers in previous studies. Dosimetric impacts of our scheme were evaluated on PTVs and OARs in comparison with original plan dose with original geometry and original plan recalculated dose with new setup geometries. Results: With conventional plan-centered approach, setup error could lead to significant PTV D99 decrease (−0.25∼+32.42%) and contralateral-parotid Dmean increase (−35.09∼+42.90%). The patientcentered approach is effective in mitigating such impacts to 0∼+0.20% and −0.03∼+5.01%, respectively. Computation time is <128 s. Conclusion: Patient-centered scheme is proposed to mitigate setup error impacts using replanning. Its superiority in terms of dosimetric impacts and feasibility has been shown through simulation studies on HN cases.« less

  9. Hungry Horse Dam Wildlife Habitat Enhancement Project: Long-Term Habitat Management Plan, Elk and Mule Deer Winter Range Enhancement, Firefighter Mountain and Spotted Bear Winter Ranges.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    1990-06-01

    Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less

  10. An effective public health program to reduce urban heat islands in Québec, Canada.

    PubMed

    Beaudoin, Mélanie; Gosselin, Pierre

    2016-09-01

    In 2005, the Government of the Province of Québec, Canada, adopted the Climate Change Action Plan for 2006 - 2012. The Institut national de santé publique du Québec (National Institute of Public Health of Québec), charged with implementing the health adaptation component of the Plan, worked to mitigate urban heat islands (UHI) by funding and evaluating 40 pilot projects. These projects explored different methods of fighting UHIs by greening cities in a participative and mobilizing approach led mainly by non-governmental organizations and municipalities. An assessment of temperatures before and after implementing various methods demonstrated that some actions enabled significant gains of coolness and more efficiently mitigated heat (reduction of concrete/asphalt surfaces, increasing vegetation, etc.). An assessment of quality of life showed that projects were positively received by users, especially by those living in vulnerable situations. A lifecycle analysis showed that from the environmental perspective, UHI mitigation measures that do not require fertilization or maintenance are preferable. Finally, communication efforts that raise awareness of UHI and mitigation are of significant importance to program success.

  11. An academic medical center's response to widespread computer failure.

    PubMed

    Genes, Nicholas; Chary, Michael; Chason, Kevin W

    2013-01-01

    As hospitals incorporate information technology (IT), their operations become increasingly vulnerable to technological breakdowns and attacks. Proper emergency management and business continuity planning require an approach to identify, mitigate, and work through IT downtime. Hospitals can prepare for these disasters by reviewing case studies. This case study details the disruption of computer operations at Mount Sinai Medical Center (MSMC), an urban academic teaching hospital. The events, and MSMC's response, are narrated and the impact on hospital operations is analyzed. MSMC's disaster management strategy prevented computer failure from compromising patient care, although walkouts and time-to-disposition in the emergency department (ED) notably increased. This incident highlights the importance of disaster preparedness and mitigation. It also demonstrates the value of using operational data to evaluate hospital responses to disasters. Quantifying normal hospital functions, just as with a patient's vital signs, may help quantitatively evaluate and improve disaster management and business continuity planning.

  12. Trading places - an innovative SO{sub 2} trading program to mitigate potential adverse impacts on class I areas: part II. Mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Louis Militana; Cindy Huber; Christopher Colbert

    2005-08-01

    This is the second of two articles describing a plan that was developed to mitigate the effects of acid deposition and visibility impairment in four Class I areas from the proposed Longview Power Project. Part I (published in July 2005) discussed the air quality impacts of the proposed coal-fired power plant. Part II discusses the mitigation plan. 2 refs., 1 fig., 3 tabs.

  13. A guide to understanding and implementing risk evaluation and mitigation strategies in organ transplantation.

    PubMed

    Gabardi, Steven; Tichy, Eric M

    2013-03-01

    To review the components of the Congressional mandate for risk evaluation and mitigation strategies (REMS) managed by the Food and Drug Administration and assess their impact on health care providers practicing within the organ transplant arena. A non-date-limited search of MEDLINE and EMBASE (January 2007-June 2012) was conducted by using the following search terms: risk evaluation and mitigation strategies, REMS, and organ transplant, including a query of the individual organs. Information from the Federal Register and the Food and Drug Administration was also evaluated. REMS are strategies implemented to manage known or potential risks associated with medications and to ensure ongoing pharmacovigilance throughout the life of a pharmaceutical product. Elements of REMS programs may consist of 3 levels: a medication guide, communication plan, and elements to assure safe use. A medication guide is used to help prevent serious adverse events, aid in patients' decision making, and enhance medication adherence. Communication plans help educate health care providers and encourage adherence with REMS. The elements to assure safe use is a restrictive process implemented when it is deemed necessary to ensure safe access for patients to products with known serious risks. In transplant medicine, REMS currently exist for belatacept (medication guide and communication plan) and the mycophenolic acid derivatives (medication guide and elements to assure safe use). REMS are another step in the evolution of the development and marketing of pharmaceutical agents. Use of REMS in solid-organ transplant is becoming common. Transplant clinicians must provide required patient education and become involved with other aspects of REMS implementation to reduce the serious risks of pharmaceuticals and to improve patients' outcomes.

  14. Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrads, T.J.

    1997-09-12

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less

  15. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  16. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  17. 48 CFR 9.504 - Contracting officer responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., contracting officers shall analyze planned acquisitions in order to— (1) Identify and evaluate potential..., or mitigate significant potential conflicts before contract award. (b) Contracting officers should... potential conflicts and in developing any necessary solicitation provisions and contract clauses (see 9.506...

  18. Information for Consumers (Drugs)

    MedlinePlus

    ... Evaluation and Mitigation Strategies (REMS) REMS is a risk management plan required by FDA for certain prescription drugs, that uses tools beyond routine professional labeling to ensure that the benefits of the drug outweigh its risks. Index to Drug - Specific Information List of drugs ...

  19. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approval process. 78.6 Section 78.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood... reasons for non-approval and offer suggestions for improvement. ...

  20. A dynamic model for costing disaster mitigation policies.

    PubMed

    Altay, Nezih; Prasad, Sameer; Tata, Jasmine

    2013-07-01

    The optimal level of investment in mitigation strategies is usually difficult to ascertain in the context of disaster planning. This research develops a model to provide such direction by relying on cost of quality literature. This paper begins by introducing a static approach inspired by Joseph M. Juran's cost of quality management model (Juran, 1951) to demonstrate the non-linear trade-offs in disaster management expenditure. Next it presents a dynamic model that includes the impact of dynamic interactions of the changing level of risk, the cost of living, and the learning/investments that may alter over time. It illustrates that there is an optimal point that minimises the total cost of disaster management, and that this optimal point moves as governments learn from experience or as states get richer. It is hoped that the propositions contained herein will help policymakers to plan, evaluate, and justify voluntary disaster mitigation expenditures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.

  1. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... that the plan is integrated to the extent practicable with other State and/or regional planning...

  2. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  3. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  4. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  5. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  6. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  7. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  8. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  9. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  10. New Tsunami Response, Mitigation, and Recovery Planning "Playbooks" for California (USA) Maritime Communities

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.

    2015-12-01

    The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance through the NTHMP to help other U.S. states/territories/commonwealths develop their own tsunami planning tools. This will lead to more accurate, consistent, and cost-effective tsunami planning strategies within the U.S.

  11. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pava, Daniel S.

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less

  12. Modelling mitigation options to reduce diffuse nitrogen water pollution from agriculture.

    PubMed

    Bouraoui, Fayçal; Grizzetti, Bruna

    2014-01-15

    Agriculture is responsible for large scale water quality degradation and is estimated to contribute around 55% of the nitrogen entering the European Seas. The key policy instrument for protecting inland, transitional and coastal water resources is the Water Framework Directive (WFD). Reducing nutrient losses from agriculture is crucial to the successful implementation of the WFD. There are several mitigation measures that can be implemented to reduce nitrogen losses from agricultural areas to surface and ground waters. For the selection of appropriate measures, models are useful for quantifying the expected impacts and the associated costs. In this article we review some of the models used in Europe to assess the effectiveness of nitrogen mitigation measures, ranging from fertilizer management to the construction of riparian areas and wetlands. We highlight how the complexity of models is correlated with the type of scenarios that can be tested, with conceptual models mostly used to evaluate the impact of reduced fertilizer application, and the physically-based models used to evaluate the timing and location of mitigation options and the response times. We underline the importance of considering the lag time between the implementation of measures and effects on water quality. Models can be effective tools for targeting mitigation measures (identifying critical areas and timing), for evaluating their cost effectiveness, for taking into consideration pollution swapping and considering potential trade-offs in contrasting environmental objectives. Models are also useful for involving stakeholders during the development of catchments mitigation plans, increasing their acceptability. © 2013.

  13. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  14. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  15. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  16. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  17. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  18. 75 FR 40846 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...

  19. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion... must include an identification and description of enforceable policies, legal authorities, funding techniques and other techniques that will be used to manage the effects of erosion, including potential...

  20. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...

  1. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...

  2. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...

  3. Developing Legacy: Health Planning in the Host City of Porto Alegre for the 2014 Football World Cup.

    PubMed

    Witt, Regina Rigatto; Kotlhar, Mauro Kruter; Mesquita, Marilise Oliveira; Lima, Maria Alice Dias da Silva; Marin, Sandra Mara; Day, Carolina Baltar; Bandeira, Andrea Goncalves; Hutton, Alison

    2015-12-01

    To describe the process adopted to identify, classify, and evaluate legacy of health care planning in the host city of Porto Alegre for the Football World Cup 2014. There is an emerging interest in the need to demonstrate a sustainable health legacy from mass gatherings investments. Leaving a public health legacy for future host cities and countries is now an important part of planning for these events. The Ministry of Sports initiated and coordinated the development of projects in the host cities to identify actions, projects, and constructions to be developed to prepare for the World Cup. In Porto Alegre, a common structure was developed by the coordinating team to instruct legacy identification, classification, and evaluation. This structure was based on international documentary analysis (including official reports, policy documents, and web-based resources) and direct communication with recognized experts in the field. Sixteen total legacies were identified for health surveillance (5) and health services (11). They were classified according to the strategic area, organizations involved, dimension, typology, planned or unplanned, tangible or intangible, territorial coverage, and situation prior to the World Cup. Possible impacts were then assessed as positive, negative, and potentiating, and mitigating actions were indicated. The project allowed the identification, classification, and development of health legacy, including risk analysis, surveillance, mitigation measures, and provision of emergency medical care. Although the project intended the development of indicators to measure the identified legacies, evaluation was not possible at the time of publication due to time.

  4. Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010-2015.

    PubMed

    Bain, Allison A; Abbott, Anne L; Miller, Laura L

    2016-04-14

    Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa's, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency's action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact.

  5. Introduction to Software Product Line Adoption

    DTIC Science & Technology

    2005-09-01

    plans • improvement suggestions • risks and mitigation strategies • progress reports • risks and mitigation strategies • adoption plan • funding ... model • organization chart • product line concept of operations (CONOPS) • marketing plan • product proposals • acquisition strategy • organization risk

  6. Adaptive management for mitigating Cryptosporidium risk in source water: a case study in an agricultural catchment in South Australia.

    PubMed

    Bryan, Brett A; Kandulu, John; Deere, Daniel A; White, Monique; Frizenschaf, Jacqueline; Crossman, Neville D

    2009-07-01

    Water-borne pathogens such as Cryptosporidium pose a significant human health risk and catchments provide the first critical pollution 'barrier' in mitigating risk in drinking water supply. In this paper we apply an adaptive management framework to mitigating Cryptosporidium risk in source water using a case study of the Myponga catchment in South Australia. Firstly, we evaluated the effectiveness of past water quality management programs in relation to the adoption of practices by landholders using a socio-economic survey of land use and management in the catchment. The impact of past management on the mitigation of Cryptosporidium risk in source water was also evaluated based on analysis of water quality monitoring data. Quantitative risk assessment was used in planning the next round of management in the adaptive cycle. Specifically, a pathogen budget model was used to identify the major remaining sources of Cryptosporidium in the catchment and estimate the mitigation impact of 30 alternative catchment management scenarios. Survey results show that earlier programs have resulted in the comprehensive adoption of best management practices by dairy farmers including exclusion of stock from watercourses and effluent management from 2000 to 2007. Whilst median Cryptosporidium concentrations in source water have decreased since 2004 they remain above target levels and put pressure on other barriers to mitigate risk, particularly the treatment plant. Non-dairy calves were identified as the major remaining source of Cryptosporidium in the Myponga catchment. The restriction of watercourse access of non-dairy calves could achieve a further reduction in Cryptosporidium export to the Myponga reservoir of around 90% from current levels. The adaptive management framework applied in this study was useful in guiding learning from past management, and in analysing, planning and refocusing the next round of catchment management strategies to achieve water quality targets.

  7. Applying the Land Use Portfolio Model to Estimate Natural-Hazard Loss and Risk - A Hypothetical Demonstration for Ventura County, California

    USGS Publications Warehouse

    Dinitz, Laura B.

    2008-01-01

    With costs of natural disasters skyrocketing and populations increasingly settling in areas vulnerable to natural hazards, society is challenged to better allocate its limited risk-reduction resources. In 2000, Congress passed the Disaster Mitigation Act, amending the Robert T. Stafford Disaster Relief and Emergency Assistance Act (Robert T. Stafford Disaster Relief and Emergency Assistance Act, Pub. L. 93-288, 1988; Federal Emergency Management Agency, 2002, 2008b; Disaster Mitigation Act, 2000), mandating that State, local, and tribal communities prepare natural-hazard mitigation plans to qualify for pre-disaster mitigation grants and post-disaster aid. The Federal Emergency Management Agency (FEMA) was assigned to coordinate and implement hazard-mitigation programs, and it published information about specific mitigation-plan requirements and the mechanisms (through the Hazard Mitigation Grant Program-HMGP) for distributing funds (Federal Emergency Management Agency, 2002). FEMA requires that each community develop a mitigation strategy outlining long-term goals to reduce natural-hazard vulnerability, mitigation objectives and specific actions to reduce the impacts of natural hazards, and an implementation plan for those actions. The implementation plan should explain methods for prioritizing, implementing, and administering the actions, along with a 'cost-benefit review' justifying the prioritization. FEMA, along with the National Institute of Building Sciences (NIBS), supported the development of HAZUS ('Hazards U.S.'), a geospatial natural-hazards loss-estimation tool, to help communities quantify potential losses and to aid in the selection and prioritization of mitigation actions. HAZUS was expanded to a multiple-hazard version, HAZUS-MH, that combines population, building, and natural-hazard science and economic data and models to estimate physical damages, replacement costs, and business interruption for specific natural-hazard scenarios. HAZUS-MH currently performs analyses for earthquakes, floods, and hurricane wind. HAZUS-MH loss estimates, however, do not account for some uncertainties associated with the specific natural-hazard scenarios, such as the likelihood of occurrence within a particular time horizon or the effectiveness of alternative risk-reduction options. Because of the uncertainties involved, it is challenging to make informative decisions about how to cost-effectively reduce risk from natural-hazard events. Risk analysis is one approach that decision-makers can use to evaluate alternative risk-reduction choices when outcomes are unknown. The Land Use Portfolio Model (LUPM), developed by the U.S. Geological Survey (USGS), is a geospatial scenario-based tool that incorporates hazard-event uncertainties to support risk analysis. The LUPM offers an approach to estimate and compare risks and returns from investments in risk-reduction measures. This paper describes and demonstrates a hypothetical application of the LUPM for Ventura County, California, and examines the challenges involved in developing decision tools that provide quantitative methods to estimate losses and analyze risk from natural hazards.

  8. Unique challenges facing Southwestern tribes: Chapter 17

    USGS Publications Warehouse

    Hiza, Margaret; Chief, Karletta; Bemis, Kirk; Gautam, Mahesh; Middleton, Beth Rose; Tsosie, Rebecca

    2013-01-01

    •\tTribes are taking action to address climate change by instituting climate-change mitigation initiatives, including utility-scale, alternative-energy projects, and energy-conservation projects. Tribes are also evaluating their existing capacity to engage in effective adaptation planning, even though financial and social capital is limited.

  9. Coupling the Biophysical and Social Dimensions of Wildfire Risk to Improve Wildfire Mitigation Planning.

    PubMed

    Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige

    2015-08-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.

  10. The international politics of geoengineering: The feasibility of Plan B for tackling climate change

    PubMed Central

    Corry, Olaf

    2017-01-01

    Geoengineering technologies aim to make large-scale and deliberate interventions in the climate system possible. A typical framing is that researchers are exploring a ‘Plan B’ in case mitigation fails to avert dangerous climate change. Some options are thought to have the potential to alter the politics of climate change dramatically, yet in evaluating whether they might ultimately reduce climate risks, their political and security implications have so far not been given adequate prominence. This article puts forward what it calls the ‘security hazard’ and argues that this could be a crucial factor in determining whether a technology is able, ultimately, to reduce climate risks. Ideas about global governance of geoengineering rely on heroic assumptions about state rationality and a generally pacific international system. Moreover, if in a climate engineered world weather events become something certain states can be made directly responsible for, this may also negatively affect prospects for ‘Plan A’, i.e. an effective global agreement on mitigation. PMID:29386754

  11. Resilience Planning Approaches “Ready-to-Use”: Lessons from EPA Partnerships. How to work with a community to design a nature-based hazard mitigation project

    EPA Science Inventory

    A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...

  12. Mitigating Community Impacts of Energy Development: Some Examples for Coal and Nuclear Generating Plants in the United States.

    ERIC Educational Resources Information Center

    Peelle, Elizabeth

    The Hartsville, Tennessee nuclear reactor site, the coal plant at Wheatland, Wyoming, and the nuclear plant at Skagit, Washington have mitigation plans developed in response to a federal, state, and local regulatory agency, respectively; the three mitigation plans aim at internalizing community-level social costs and benefits during the…

  13. Forecasting the relative influence of environmental and anthropogenic stressors on polar bears

    Treesearch

    Todd C. Atwood; Bruce G. Marcot; David C. Douglas; Steven C. Amstrup; Karyn D. Rode; George M. Durner; Jeffrey F. Bromaghin

    2016-01-01

    Effective conservation planning requires understanding and ranking threats to wildlife populations. We developed a Bayesian network model to evaluate the relative influence of environmental and anthropogenic stressors, and their mitigation, on the persistence of polar bears (Ursus maritimus). Overall sea ice conditions, affected by rising global...

  14. MO-D-213-02: Quality Improvement Through a Failure Mode and Effects Analysis of Pediatric External Beam Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, J; Lukose, R; Bronson, J

    2015-06-15

    Purpose: To conduct a failure mode and effects analysis (FMEA) as per AAPM Task Group 100 on clinical processes associated with teletherapy, and the development of mitigations for processes with identified high risk. Methods: A FMEA was conducted on clinical processes relating to teletherapy treatment plan development and delivery. Nine major processes were identified for analysis. These steps included CT simulation, data transfer, image registration and segmentation, treatment planning, plan approval and preparation, and initial and subsequent treatments. Process tree mapping was utilized to identify the steps contained within each process. Failure modes (FM) were identified and evaluated with amore » scale of 1–10 based upon three metrics: the severity of the effect, the probability of occurrence, and the detectability of the cause. The analyzed metrics were scored as follows: severity – no harm = 1, lethal = 10; probability – not likely = 1, certainty = 10; detectability – always detected = 1, undetectable = 10. The three metrics were combined multiplicatively to determine the risk priority number (RPN) which defined the overall score for each FM and the order in which process modifications should be deployed. Results: Eighty-nine procedural steps were identified with 186 FM accompanied by 193 failure effects with 213 potential causes. Eighty-one of the FM were scored with a RPN > 10, and mitigations were developed for FM with RPN values exceeding ten. The initial treatment had the most FM (16) requiring mitigation development followed closely by treatment planning, segmentation, and plan preparation with fourteen each. The maximum RPN was 400 and involved target delineation. Conclusion: The FMEA process proved extremely useful in identifying previously unforeseen risks. New methods were developed and implemented for risk mitigation and error prevention. Similar to findings reported for adult patients, the process leading to the initial treatment has an associated high risk.« less

  15. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  16. 44 CFR 201.6 - Local Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...

  17. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... mitigation activities, and agencies that have the authority to regulate development, as well as businesses...; (C) A general description of land uses and development trends within the tribal planning area so that...

  18. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...

  19. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...

  20. An attempt to implement tools to support examination of community-based activities for disaster mitigation: A case study in Toyokawa city, Japan

    NASA Astrophysics Data System (ADS)

    Karashima, Kazuki; Ohgai, Akira

    2017-10-01

    Japan is a country with a high risk for earthquake disasters. The measures used to promote structures' seismic safety, such as reconstruction, widening narrow roads, and the response capacities to deal with huge earthquakes are important. Techniques to support the examination of countermeasures to huge earthquakes are required. To improve this capability, the authors developed tools to: (1) evaluate fire-spread risk, (2) evaluate the difficulty of emergency response and evacuation, and (3) evaluate capacities of neighborhood communities for disaster mitigation. The usefulness of the tools was clarified by the demonstration experiments of previous studies. The next step was implementation of the tools in community-based activities for disaster mitigation. This study aimed to clarify the usability and problems of implementing the tools in community-based activities. The tools were used at several workshops in actual community-based activities for disaster mitigation for one year. After the last workshop, interviews and a questionnaire were conducted on municipal staff and consultant staff. The results found that the tools visually showed the fire-spread risk, the difficulty of evacuation under current conditions and after improvements, and the effects of each disaster mitigation activity. The users could easily explore the draft plans to promote seismic safety of urban structures and response capabilities. The tools were positively incorporated into some community-based activities for disaster mitigation. Thus, the tools have the possibility of successful use at continuing community-based activities and the possibility of implementing the tools will be promoted.

  1. Planning Tools For Seismic Risk Mitigation. Rules And Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Paoli, Rosa Grazia

    2008-07-08

    Recently, Italian urban planning research in the field of seismic risk mitigation are renewing. In particular, it promotes strategies that integrate urban rehabilitation and aseismic objectives, and also politicizes that are directed to revitalizes urban systems, coupling physical renewal and socio-economic development.In Italy the first law concerning planning for seismic mitigation dates back 1974, the law n. 64 'Regulation for buildings with particular rules for the seismic areas' where the rules for buildings in seismic areas concerning also the local hazard. This law, in fact, forced the municipalities to acquire, during the formation of the plans, a preventive opinion ofmore » compatibility between planning conditions and geomorphology conditions of the territory. From this date the conviction that the seismic risk must be considered inside the territorial planning especially in terms of strategies of mitigation has been strengthened.The town planners have started to take an interest in seismic risk in the [80]s when the Irpinia's earthquake took place. The researches developed after this earthquake have established that the principal cause of the collapse of buildings are due to from the wrong location of urban settlements (on slopes or crowns) After Irpinia's earthquake the first researches on seismic risk mitigation, in particular on the aspects related to the hazards and to the urban vulnerability were made.« less

  2. Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes

    PubMed Central

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972

  3. Development by design in Colombia: making mitigation decisions consistent with conservation outcomes.

    PubMed

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.

  4. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  5. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  6. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  7. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  8. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  9. Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010–2015

    PubMed Central

    Abbott, Anne L.; Miller, Laura L.

    2016-01-01

    Background Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa’s, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Community Context Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency’s action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. Methods A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. Outcome The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Interpretation Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact. PMID:27079648

  10. Evaluating soil risks associated with severe wildfire and ground-based logging

    Treesearch

    Keith M. Reynolds; Paul F. Hessburg; Richard E. Miller; Robert T. Meurisse

    2011-01-01

    Rehabilitation and timber-salvage activities after wildfire require rapid planning and rational decisions. Identifying areas with high risk for erosion and soil productivity losses is important. Moreover, allocation of corrective and mitigative efforts must be rational and prioritized. Our logic-based analysis of forested soil polygons on the Okanogan-Wenatchee...

  11. Mitigating Errors of Representation: A Practical Case Study of the University Experience Survey

    ERIC Educational Resources Information Center

    Whiteley, Sonia

    2014-01-01

    The Total Survey Error (TSE) paradigm provides a framework that supports the effective planning of research, guides decision making about data collection and contextualises the interpretation and dissemination of findings. TSE also allows researchers to systematically evaluate and improve the design and execution of ongoing survey programs and…

  12. Preventing a data breach from becoming a disaster.

    PubMed

    Goldberg, Ed

    2013-01-01

    Organisations have traditionally dealt with data breaches by investing in protective measures without a great deal of attention to mitigation of breach consequences and response. Conversely, business continuity (BC) planning has traditionally focused on mitigating disasters, not on preventing them. From a BC planning perspective, organisations need to assume that a data breach is inevitable and plan accordingly. The spate of data breaches in these past few years hit many organisations that were well protected. Those that suffered disastrous consequences as a result of a data breach lacked effective mitigation and response, not protection. The complexity and speed of an effective data breach response require that detailed planning takes place in advance of a breach.

  13. Wide-area decontamination in an urban environment after radiological dispersion: A review and perspectives.

    PubMed

    Kaminski, Michael D; Lee, Sang Don; Magnuson, Matthew

    2016-03-15

    Nuclear or radiological terrorism in the form of uncontrolled radioactive contamination presents a unique challenge in the field of nuclear decontamination. Potential targets require an immediate decontamination response, or mitigation plan to limit the social and economic impact. To date, experience with urban decontamination of building materials - specifically hard, porous, external surfaces - is limited to nuclear weapon fallout and nuclear reactor accidents. Methods are lacking for performing wide-area decontamination in an urban environment so that in all release scenarios the area may be re-occupied without evaluation and/or restriction. Also lacking is experience in developing mitigation strategies, that is, methods of mitigating contamination and its resultant radiation dose in key areas during the immediate aftermath of an event and after lifesaving operations. To date, the tremendous strategy development effort primarily by the European community has focused on the recovery phase, which extends years beyond the release event. In this review, we summarize the methods and data collected over the past 70 years in the field of hard, external surface decontamination of radionuclide contaminations, with emphasis on methods suitable for response to radiological dispersal devices and their potentially unique physico-chemical characteristics. This review concludes that although a tremendous amount of work has been completed primarily by the European Community (EU) and the United Kingdom (UK), the few studies existing on each technique permit only very preliminary estimates of decontamination factors for various building materials and methods and extrapolation of those values for use in environments outside the EU and UK. This data shortage prevents us from developing an effective and detailed mitigation response plan and remediation effort. Perhaps most importantly, while the data available does include valuable information on the practical aspects of performing the various remediation methods including costs, coverage rates, manpower, pitfalls, etc., it lacks the details on lessons learned, best practices, and standard procedures, for instance, that would be required to develop a mitigation strategy. While the urban decontamination problem is difficult and there is much more research to do, the existing literature provides a framework for a response plan. Using this framework, in conjunction with computer modeling and relevant data collection, can lead to development of appropriate plans and exercises that would permit development of a mitigation and remediation response. Copyright © 2015 Elsevier B.V. All rights reserved.

  14. National Wetland Mitigation Banking Study. Commercial Wetland Mitigation Credit Markets: Theory and Practice.

    DTIC Science & Technology

    1995-11-01

    based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of

  15. Natura 2000 appropriate assessment: Shortcomings and improvements in Finnish practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soederman, Tara

    2009-02-15

    The EU Habitats Directive 92/43/EEC requires impact assessments called Appropriate Assessments (AA) for plans and projects probably having adverse effects on the sites of European ecological importance, Natura 2000 sites. Seventy-three Appropriate Assessment reports and seventy official opinions given on them by regional environmental authorities from 1997 to 2005 were reviewed. The findings of the study demonstrate typical shortcomings of ecological impact assessment: a weak information basis for assessment outcomes and lack of proper cumulative impact assessment with respect to ecological structures and processes. The quality of reporting has improved over time with respect to direct impacts on individual habitatmore » types and species and detailed mitigation measures. Regional environment centres considered one fifth of the AA reports to be inadequate because of lacking data. In most cases the regional environment centres demanded a change of plan or project, added mitigation measures, choice of only one alternative for further planning or a new completed assessment with additional information in order to be able to evaluate the significance of the effects. The study underlines the need for iterative planning practices in which the preparation of a plan or project with alternative options goes hand in hand with the impact assessment equipped with sufficient data.« less

  16. The US Food and Drug Administration's Risk Evaluation and Mitigation Strategy (REMS) Program - Current Status and Future Direction.

    PubMed

    Wu, Jasmanda; Juhaeri, Juhaeri

    2016-12-01

    The US Food and Drug Administration (FDA) Amendments Act of 2007 granted the FDA new authorities to enhance drug safety by requiring application holders to submit a proposed Risk Evaluation and Mitigation Strategy (REMS). A REMS is a required risk management plan that uses tools beyond the package insert. REMS elements may include a medication guide and patient package insert for patients and a communication plan focused on health care professionals. Elements to assure safe use (ETASUs) are put in place to mitigate a specific known serious risk when other less restrictive elements of a REMS are not sufficient to mitigate such risk. An implementation system is required for an REMS that includes the ETASUs. With approximately eight years of experience with REMS programs, many health care settings have created systems to manage REMS and also to integrate REMS into their practice settings. At the same time, there are issues associated with the development and implementation of REMS. In 2011, FDA created the REMS Integration Initiative to develop guidance on how to apply statutory criteria to determine when a REMS is required, to improve standardization and assessment of REMS, and to improve integration of REMS into the existing healthcare system. A key component of the REMS Integration Initiative is stakeholder outreach to better understand how existing REMS programs are working and to identify opportunities for improvement. This review attempts to share our company's experience with the REMS program, and to provide updates on FDA's efforts to improve REMS communication, to standardize REMS process, to reduce REMS program burdens and to build a common REMS platform. Copyright © 2016 Elsevier HS Journals, Inc. All rights reserved.

  17. The impact on air quality of energy saving measures in the major cities signatories of the Covenant of Mayors initiative.

    PubMed

    Monforti-Ferrario, Fabio; Kona, Albana; Peduzzi, Emanuela; Pernigotti, Denise; Pisoni, Enrico

    2018-06-08

    This study is a first attempt to evaluate how the major efforts made by several European cities in the frame of the Covenant of Mayors (CoM) initiative can impact the air pollution levels in the participating cities. CoM is by no mean one of the major cities initiatives aimed at mitigating climate change, supporting local authorities in the implementation of their climate action plans. Energy savings measures reported in the CoM cities' action plans have been analysed from the air quality perspective in order to find quantitative relations in the way local authorities deal with mitigation and how these practices are expected to have consequences on the air quality at urban level and finally positively impacting the citizens' health. In the paper, the air quality 2713 energy saving measures proposed by 146 cities located in 23 countries in the frame of the CoM are selected and their co-benefits for air quality and public health estimated by means of SHERPA, a fast modelling tool that mimics the behaviour of a full physically-based Chemical Transport Model. Besides evaluating the overall benefits of this subset of mitigation measures for the air quality, the study also investigates the relevance of some factors such as the implementation sector, the city size and the pollution levels in achieving the highest possible co-benefits. The results presented refer to the special field covered by the study, i.e. energy saving measures and are not automatically referable to other types of measures. Nevertheless, they clearly show how climate mitigation and air quality policies are deeply interconnected at the urban level. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  18. Coupling the biophysical and social dimensions of wildfire risk to improve wildfire mitigation planning

    Treesearch

    Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher

    2015-01-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...

  19. Resilience Mitigation Financing Webinar for Water and Wastewater Utilities

    EPA Pesticide Factsheets

    The Resilience Mitigation Financing for Water and Wastewater Utilities webinar focuses on tools and financing resources to conduct resilience planning and to mitigate impacts before a disaster strikes.

  20. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared anmore » environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.« less

  1. Determining Coastal Hazards Risk Perception to Enhance Local Mitigation Planning through a Participatory Mapping Approach

    NASA Astrophysics Data System (ADS)

    Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.

    2017-12-01

    Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit local hazard mitigation and adaptation planning. The results to date in achieving the project objectives will be presented that include: analyses of scientific field data collected related to marsh vegetation biomass characteristics, analyses of TEK data collected, and mapping products developed.

  2. 33 CFR 155.1052 - Response plan development and evaluation criteria for vessels carrying group V petroleum oil as a...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Sources of the equipment and supplies necessary to locate, recover, and mitigate such a discharge. (b... salvage company with appropriate expertise and equipment; and (2) A company with vessel firefighting... or operators must identify intended sources of the resources required under paragraph (e) of this...

  3. Ecological impact assessments fail to reduce risk of bat casualties at wind farms.

    PubMed

    Lintott, Paul R; Richardson, Suzanne M; Hosken, David J; Fensome, Sophie A; Mathews, Fiona

    2016-11-07

    Demand for renewable energy is rising exponentially. While this has benefits in reducing greenhouse gas emissions, there may be costs to biodiversity [1]. Environmental Impact Assessments (EIAs) are the main tool used across the world to predict the overall positive and negative effects of renewable energy developments before planning consent is given, and the Ecological Impact Assessments (EcIAs) within them assess their species-specific effects. Given that EIAs are undertaken globally, are extremely expensive, and are enshrined in legislation, their place in evidence-based decision making deserves evaluation. Here we assess how well EIAs of wind-farm developments protect bats. We found they do not predict the risks to bats accurately, and even in those cases where high risk was correctly identified, the mitigation deployed did not avert the risk. Given that the primary purpose of an EIA is to make planning decisions evidence-based, our results indicate that EIA mitigation strategies used to date have been ineffective in protecting bats. In the future, greater emphasis should be placed on assessing the actual impacts post-construction and on developing effective mitigation strategies. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  4. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  5. Effectiveness of damped braces to mitigate seismic torsional response of unsymmetric-plan buildings

    NASA Astrophysics Data System (ADS)

    Mazza, Fabio; Pedace, Emilia; Favero, Francesco Del

    2017-02-01

    The seismic retrofitting of unsymmetric-plan reinforced concrete (r.c.) framed buildings can be carried out by the incorporation of damped braces (DBs). Yet most of the proposals to mitigate the seismic response of asymmetric framed buildings by DBs rest on the hypothesis of elastic (linear) structural response. The aim of the present work is to evaluate the effectiveness and reliability of a Displacement-Based Design procedure of hysteretic damped braces (HYDBs) based on the nonlinear behavior of the frame members, which adopts the extended N2 method considered by Eurocode 8 to evaluate the higher mode torsional effects. The Town Hall of Spilinga (Italy), a framed structure with an L-shaped plan built at the beginning of the 1960s, is supposed to be retrofitted with HYDBs to attain performance levels imposed by the Italian seismic code (NTC08) in a high-risk zone. Ten structural solutions are compared by considering two in-plan distributions of the HYDBs, to eliminate (elastic) torsional effects, and different design values of the frame ductility combined with a constant design value of the damper ductility. A computer code for the nonlinear dynamic analysis of r.c. spatial framed structures is adopted to evaluate the critical incident angle of bidirectional earthquakes. Beams and columns are simulated with a lumped plasticity model, including flat surface modeling of the axial load-biaxial bending moment elastic domain at the end sections, while a bilinear law is used to idealize the behavior of the HYDBs. Damage index domains are adopted to estimate the directions of least seismic capacity, considering artificial earthquakes whose response spectra match those adopted by NTC08 at serviceability and ultimate limit states.

  6. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  7. Strategic Defense Initiative Demonstration/Validation Program Environmental Assessment. Ground-Based Surveillance and Tracking System (GSTS),

    DTIC Science & Technology

    1987-08-01

    conflicts between the facility and local standards, and to evaluate the probability of conflict resulting from any planned expansions. 2-2 Visual Resources...on staffing and housing for the facility itself is contained in Table 2-7. Additional data on the socio - economic background of Ebeye, including...resources, noise, and socio - economics. As a result of that evaluation, consequences vere assigned to one of three categories: insignificant, mitigable, or

  8. The inclusion of biodiversity in environmental impact assessment: Policy-related progress limited by gaps and semantic confusion.

    PubMed

    Bigard, Charlotte; Pioch, Sylvain; Thompson, John D

    2017-09-15

    Natural habitat loss and fragmentation, as a result of development projects, are major causes of biodiversity erosion. Environmental impact assessment (EIA) is the most commonly used site-specific planning tool that takes into account the effects of development projects on biodiversity by integrating potential impacts into the mitigation hierarchy of avoidance, reduction, and offset measures. However, the extent to which EIA fully address the identification of impacts and conservation stakes associated with biodiversity loss has been criticized in recent work. In this paper we examine the extent to which biodiversity criteria have been integrated into 42 EIA from 2006 to 2016 for small development projects in the Montpellier Metropolitan territory in southern France. This study system allowed us to question how EIA integrates biodiversity impacts on a scale relevant to land-use planning. We examine how biodiversity inclusion has changed over time in relation to new policy for EIA and how the mitigation hierarchy is implemented in practice and in comparison with national guidelines. We demonstrate that the inclusion of biodiversity features into EIA has increased significantly in relation to policy change. Several weaknesses nevertheless persist, including the continued absence of substitution solution assessment, a correct analysis of cumulative impacts, the evaluation of impacts on common species, the inclusion of an ecological network scale, and the lack of monitoring and evaluation measures. We also show that measures for mitigation hierarchy are primarily associated with the reduction of impacts rather than their avoidance, and avoidance and offset measures are often misleadingly proposed in EIA. There is in fact marked semantic confusion between avoidance, reduction and offset measures that may impair stakeholders' understanding. All in all, reconsideration of stakeholders routine practices associated with a more strategic approach towards impact anticipation and avoidance at a land-use planning scale is now necessary for the mitigation hierarchy to become a clear and practical hierarchy for "no net loss" objectives based on conservation priorities. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. The use of air bags for mitigating grade crossing and trespass accidents : literature review and research plan.

    DOT National Transportation Integrated Search

    2016-06-01

    This literature review will confirm prior work in the use of locomotive airbag technologies for vehicle or pedestrian collision : mitigation, and to focus planned activities and tasks for this research. The state of the art in relevant technologies h...

  10. HYPOXIA IN THE NORTHERN GULF OF MEXICO: DOES THE SCIENCE SUPPORT THE PLAN TO REDUCE, MITIGATE, AND CONTROL HYPOXIA?

    EPA Science Inventory

    We update and reevaluate the scientific information on the distribution, history and causes of continental shelf hypoxia that supports the 2001 "Action Plan for Reducing, Mitigating, and Controlling Hypoxiain the Northern Gulf of Mexico," incorporating data, publications, and res...

  11. Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rich, Bruce A.; Petrosky, Charles E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less

  12. Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines.

    PubMed

    Gilbuena, Romeo; Kawamura, Akira; Medina, Reynaldo; Nakagawa, Naoko; Amaguchi, Hideo

    2013-12-15

    In recent years, the practice of environmental impact assessment (EIA) has created significant awareness on the role of environmentally sound projects in sustainable development. In view of the recent studies on the effects of climate change, the Philippine government has given high priority to the construction of flood control structures to alleviate the destructive effects of unmitigated floods, especially in highly urbanized areas like Metro Manila. EIA thus, should be carefully and effectively carried out to maximize or optimize the potential benefits that can be derived from structural flood mitigation measures (SFMMs). A utility-based environmental assessment approach may significantly aid flood managers and decision-makers in planning for effective and environmentally sound SFMM projects. This study proposes a utility-based assessment approach using the rapid impact assessment matrix (RIAM) technique, coupled with the evidential reasoning approach, to rationally and systematically evaluate the ecological and socio-economic impacts of 4 planned SFMM projects (i.e. 2 river channel improvements and 2 new open channels) in Metro Manila. Results show that the overall environmental effects of each of the planned SFMM projects are positive, which indicate that the utility of the positive impacts would generally outweigh the negative impacts. The results also imply that the planned river channel improvements will yield higher environmental benefits over the planned open channels. This study was able to present a clear and rational approach in the examination of overall environmental effects of SFMMs, which provides valuable insights that can be used by decision-makers and policy makers to improve the EIA practice and evaluation of projects in the Philippines. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Standard guide for developing a cost-effective risk mitigation plan for new and existing constructed facilities

    Treesearch

    Jeffrey Prestemon

    2011-01-01

    Protecting constructed facilities from damages from natural and man-made hazards in a costeffective manner is a challenging task. Several measures of economic performance are available for evaluating building-related investments. These measures include, but are not limited to, life-cycle cost, present value net savings, savings-to-investment ratio, and adjusted...

  14. Group consensus peer review in radiation oncology: commitment to quality.

    PubMed

    Duggar, W Neil; Bhandari, Rahul; Yang, Chunli Claus; Vijayakumar, Srinivasan

    2018-03-27

    Peer review, especially prospective peer review, has been supported by professional organizations as an important element in optimal Radiation Oncology practice based on its demonstration of efficacy at detecting and preventing errors prior to patient treatment. Implementation of peer review is not without barriers, but solutions do exist to mitigate or eliminate some of those barriers. Peer review practice at our institution involves three key elements: new patient conference, treatment planning conference, and chart rounds. The treatment planning conference is an adaptation of the group consensus peer review model from radiology which utilizes a group of peers reviewing each treatment plan prior to implementation. The peer group in radiation oncology includes Radiation Oncologists, Physician Residents, Medical Physicists, Dosimetrists, and Therapists. Thus, technical and clinical aspects of each plan are evaluated simultaneously. Though peer review is held in high regard in Radiation Oncology, many barriers commonly exist preventing optimal implementation such as time intensiveness, repetition, and distraction from clinic time with patients. Through the use of automated review tools and commitment by individuals and administration in regards to staffing, scheduling, and responsibilities, these barriers have been mitigated to implement this Group Consensus Peer Review model into a Radiation Oncology Clinic. A Group Consensus Peer Review model has been implemented with strategies to address common barriers to effective and efficient peer review.

  15. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  16. The NASA Continuous Risk Management Process

    NASA Technical Reports Server (NTRS)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics are established and monitored as tools for risk tracking. Also a trigger or threshold should be set on the metric data that indicates when an action is needed. Results of this tracking are usually evaluated and reported in a relevant format at weekly or monthly meetings. Choosing controls is the subsequent step, which involves the effects of the tracking. The three basic controls are: close, continue tracking, and re- plan. Finally communicate & document is the last step, but occurs throughout the process. It is vital that main risks, plans, changes, and progress are known by everyone in the project. A good way to keep everyone updated and inform other projects of common issues is by thoroughly documenting project risks. NASA sees value in risk management and believes that projects have greater probability or success by using the NASA Continuous Risk Management Process.

  17. Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuehn, Douglas; Berger, Matthew

    1992-01-01

    Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.

  18. 40 CFR 51.860 - Mitigation of air quality impacts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Mitigation of air quality impacts. 51... Federal Actions to State or Federal Implementation Plans § 51.860 Mitigation of air quality impacts. Link... mitigate air quality impacts must be identified and the process for implementation and enforcement of such...

  19. Applying the Land Use Portfolio Model with Hazus to analyse risk from natural hazard events

    USGS Publications Warehouse

    Dinitz, Laura B.; Taketa, Richard A.

    2013-01-01

    This paper describes and demonstrates the integration of two geospatial decision-support systems for natural-hazard risk assessment and management. Hazus is a risk-assessment tool developed by the Federal Emergency Management Agency to identify risks and estimate the severity of risk from natural hazards. The Land Use Portfolio Model (LUPM) is a risk-management tool developed by the U.S. Geological Survey to evaluate plans or actions intended to reduce risk from natural hazards. We analysed three mitigation policies for one earthquake scenario in the San Francisco Bay area to demonstrate the added value of using Hazus and the LUPM together. The demonstration showed that Hazus loss estimates can be input to the LUPM to obtain estimates of losses avoided through mitigation, rates of return on mitigation investment, and measures of uncertainty. Together, they offer a more comprehensive approach to help with decisions for reducing risk from natural hazards.

  20. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  1. Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Idaho. Dept. of Fish and Game.

    1990-03-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less

  2. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations,more » and guilds.« less

  3. A dataset mapping the potential biophysical effects of vegetation cover change

    NASA Astrophysics Data System (ADS)

    Duveiller, Gregory; Hooker, Josh; Cescatti, Alessandro

    2018-02-01

    Changing the vegetation cover of the Earth has impacts on the biophysical properties of the surface and ultimately on the local climate. Depending on the specific type of vegetation change and on the background climate, the resulting competing biophysical processes can have a net warming or cooling effect, which can further vary both spatially and seasonally. Due to uncertain climate impacts and the lack of robust observations, biophysical effects are not yet considered in land-based climate policies. Here we present a dataset based on satellite remote sensing observations that provides the potential changes i) of the full surface energy balance, ii) at global scale, and iii) for multiple vegetation transitions, as would now be required for the comprehensive evaluation of land based mitigation plans. We anticipate that this dataset will provide valuable information to benchmark Earth system models, to assess future scenarios of land cover change and to develop the monitoring, reporting and verification guidelines required for the implementation of mitigation plans that account for biophysical land processes.

  4. A dataset mapping the potential biophysical effects of vegetation cover change

    PubMed Central

    Duveiller, Gregory; Hooker, Josh; Cescatti, Alessandro

    2018-01-01

    Changing the vegetation cover of the Earth has impacts on the biophysical properties of the surface and ultimately on the local climate. Depending on the specific type of vegetation change and on the background climate, the resulting competing biophysical processes can have a net warming or cooling effect, which can further vary both spatially and seasonally. Due to uncertain climate impacts and the lack of robust observations, biophysical effects are not yet considered in land-based climate policies. Here we present a dataset based on satellite remote sensing observations that provides the potential changes i) of the full surface energy balance, ii) at global scale, and iii) for multiple vegetation transitions, as would now be required for the comprehensive evaluation of land based mitigation plans. We anticipate that this dataset will provide valuable information to benchmark Earth system models, to assess future scenarios of land cover change and to develop the monitoring, reporting and verification guidelines required for the implementation of mitigation plans that account for biophysical land processes. PMID:29461538

  5. Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fredenberg, Wade; Carty, Daniel; Cavigli, Jon

    1996-06-01

    The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less

  6. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL) programs... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  7. West Valley demonstration project: Implementation of the kerosene mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrosky, Charles E.; Holubetz, Terry B.

    The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less

  9. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year two technical report.

    DOT National Transportation Integrated Search

    2014-11-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives and to identify mitigation strategies and priorities that provide greater cost-benefit potential and implement...

  10. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year one technical report.

    DOT National Transportation Integrated Search

    2014-04-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives, and identify mitigation strategies and priorities that provide greater cost-benefit : potential and implement...

  11. Wetlands Mitigation Banking Concepts

    DTIC Science & Technology

    1992-07-01

    Naval Amphibious Bas Eslgrss Mit. Bank CA, San Diego Co. dredging & facilities Dept of the Navy SeaWorld Eelgras Mitigation Dank CA, San Diego Co...shore development, private projects SeaWorld 8 Table 2. WETLAND MITIGATION BANKS UNDER PLANNING, Institute for Water Resources Preliminary Survey Data

  12. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  13. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  14. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.2... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  15. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  16. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  17. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  18. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  19. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  20. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  1. Lunar Dust on Heat Rejection System Surfaces: Problems and Prospects

    NASA Technical Reports Server (NTRS)

    Gaier, James R.; Jaworske, Donald A.

    2007-01-01

    Heat rejection from power systems will be necessary for human and robotic activity on the lunar surface. Functional operation of such heat rejection systems is at risk of degradation as a consequence of dust accumulation. The Apollo astronauts encountered marked degradation of performance in heat rejection systems for the lunar roving vehicle, science packages, and other components. Although ground testing of dust mitigation concepts in support of the Apollo mission identified mitigation tools, the brush concept adopted by the Apollo astronauts proved essentially ineffective. A better understanding of the issues associated with the impact of lunar dust on the functional performance of heat rejection systems and its removal is needed as planning gets underway for human and robotic missions to the Moon. Renewed emphasis must also be placed on ground testing of pristine and dust-covered heat rejection system surfaces to quantify degradation and address mitigation concepts. This paper presents a review of the degradation in performance of heat rejection systems encountered on the lunar surface to-date, and will discuss current activities underway to evaluate the durability of candidate heat rejection system surfaces and current dust mitigation concepts.

  2. Earthquake Hazard Mitigation Using a Systems Analysis Approach to Risk Assessment

    NASA Astrophysics Data System (ADS)

    Legg, M.; Eguchi, R. T.

    2015-12-01

    The earthquake hazard mitigation goal is to reduce losses due to severe natural events. The first step is to conduct a Seismic Risk Assessment consisting of 1) hazard estimation, 2) vulnerability analysis, 3) exposure compilation. Seismic hazards include ground deformation, shaking, and inundation. The hazard estimation may be probabilistic or deterministic. Probabilistic Seismic Hazard Assessment (PSHA) is generally applied to site-specific Risk assessments, but may involve large areas as in a National Seismic Hazard Mapping program. Deterministic hazard assessments are needed for geographically distributed exposure such as lifelines (infrastructure), but may be important for large communities. Vulnerability evaluation includes quantification of fragility for construction or components including personnel. Exposure represents the existing or planned construction, facilities, infrastructure, and population in the affected area. Risk (expected loss) is the product of the quantified hazard, vulnerability (damage algorithm), and exposure which may be used to prepare emergency response plans, retrofit existing construction, or use community planning to avoid hazards. The risk estimate provides data needed to acquire earthquake insurance to assist with effective recovery following a severe event. Earthquake Scenarios used in Deterministic Risk Assessments provide detailed information on where hazards may be most severe, what system components are most susceptible to failure, and to evaluate the combined effects of a severe earthquake to the whole system or community. Casualties (injuries and death) have been the primary factor in defining building codes for seismic-resistant construction. Economic losses may be equally significant factors that can influence proactive hazard mitigation. Large urban earthquakes may produce catastrophic losses due to a cascading of effects often missed in PSHA. Economic collapse may ensue if damaged workplaces, disruption of utilities, and resultant loss of income produces widespread default on payments. With increased computational power and more complete inventories of exposure, Monte Carlo methods may provide more accurate estimation of severe losses and the opportunity to increase resilience of vulnerable systems and communities.

  3. Dextromethorphan: a case study on addressing abuse of a safe and effective drug.

    PubMed

    Spangler, David C; Loyd, Catherine M; Skor, Emily E

    2016-06-23

    Dextromethorphan is a safe, effective cough suppressant, available without a prescription in the United States since 1958. Due to a perceived prevalence of abuse of dextromethorphan by teens, in 2007 the Drug Enforcement Administration requested the Food and Drug Administration evaluate whether dextromethorphan should be recommended for scheduling under the Controlled Substances Act. The Food and Drug Administration held an Advisory Committee meeting in 2010 to provide a scientific and medical evaluation of dextromethorphan and its abuse potential. To address reports of abuse, particularly by teens in the United States, the Consumer Healthcare Products Association initiated an abuse mitigation plan in 2010 with specific goals related to awareness of the behavior, perception of risk, social disapproval, and access to the products. In identifying abuse interventions, experts acknowledge that substance abuse among teens is a highly complex behavior and indicate that the best course of action is to address prevention by focusing on the factors that impact teen behavior. It is noteworthy that the annual prevalence of over-the-counter cough medicine abuse has sharply decreased since 2010. While a true cause-and-effect relationship cannot be assured, the Consumer Healthcare Products Association and its member companies believe that the increased awareness of the issue since the 2010 Food and Drug Administration Advisory Committee meeting, and the subsequent implementation of a well-delivered and targeted abuse mitigation plan that addressed the levers influencing teen decisions is contributing to the observed reduction in abuse. During the period of 2010-2015, reported abuse of dextromethorphan by 8(th), 10(th), and 12(th) graders decreased 35 %. The authors believe this reduction supports the view of the Consumer Healthcare Products Association at the outset of the abuse mitigation plan effort and today: Controlled substance scheduling or prescription requirements would result in a reduction in the legitimate use of this medicine that has benefits that far outweigh its risks. Instead, there are more targeted, more effective, and less disruptive interventions to address dextromethorphan abuse.

  4. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  5. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receivemore » credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.« less

  6. Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements

    NASA Technical Reports Server (NTRS)

    McKinley, David

    2008-01-01

    The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.

  7. A Dynamic Model for the Evaluation of Aircraft Engine Icing Detection and Control-Based Mitigation Strategies

    NASA Technical Reports Server (NTRS)

    Simon, Donald L.; Rinehart, Aidan W.; Jones, Scott M.

    2017-01-01

    Aircraft flying in regions of high ice crystal concentrations are susceptible to the buildup of ice within the compression system of their gas turbine engines. This ice buildup can restrict engine airflow and cause an uncommanded loss of thrust, also known as engine rollback, which poses a potential safety hazard. The aviation community is conducting research to understand this phenomena, and to identify avoidance and mitigation strategies to address the concern. To support this research, a dynamic turbofan engine model has been created to enable the development and evaluation of engine icing detection and control-based mitigation strategies. This model captures the dynamic engine response due to high ice water ingestion and the buildup of ice blockage in the engines low pressure compressor. It includes a fuel control system allowing engine closed-loop control effects during engine icing events to be emulated. The model also includes bleed air valve and horsepower extraction actuators that, when modulated, change overall engine operating performance. This system-level model has been developed and compared against test data acquired from an aircraft turbofan engine undergoing engine icing studies in an altitude test facility and also against outputs from the manufacturers customer deck. This paper will describe the model and show results of its dynamic response under open-loop and closed-loop control operating scenarios in the presence of ice blockage buildup compared against engine test cell data. Planned follow-on use of the model for the development and evaluation of icing detection and control-based mitigation strategies will also be discussed. The intent is to combine the model and control mitigation logic with an engine icing risk calculation tool capable of predicting the risk of engine icing based on current operating conditions. Upon detection of an operating region of risk for engine icing events, the control mitigation logic will seek to change the engines operating point to a region of lower risk through the modulation of available control actuators while maintaining the desired engine thrust output. Follow-on work will assess the feasibility and effectiveness of such control-based mitigation strategies.

  8. Experimental study designs to improve the evaluation of road mitigation measures for wildlife.

    PubMed

    Rytwinski, Trina; van der Ree, Rodney; Cunnington, Glenn M; Fahrig, Lenore; Findlay, C Scott; Houlahan, Jeff; Jaeger, Jochen A G; Soanes, Kylie; van der Grift, Edgar A

    2015-05-01

    An experimental approach to road mitigation that maximizes inferential power is essential to ensure that mitigation is both ecologically-effective and cost-effective. Here, we set out the need for and standards of using an experimental approach to road mitigation, in order to improve knowledge of the influence of mitigation measures on wildlife populations. We point out two key areas that need to be considered when conducting mitigation experiments. First, researchers need to get involved at the earliest stage of the road or mitigation project to ensure the necessary planning and funds are available for conducting a high quality experiment. Second, experimentation will generate new knowledge about the parameters that influence mitigation effectiveness, which ultimately allows better prediction for future road mitigation projects. We identify seven key questions about mitigation structures (i.e., wildlife crossing structures and fencing) that remain largely or entirely unanswered at the population-level: (1) Does a given crossing structure work? What type and size of crossing structures should we use? (2) How many crossing structures should we build? (3) Is it more effective to install a small number of large-sized crossing structures or a large number of small-sized crossing structures? (4) How much barrier fencing is needed for a given length of road? (5) Do we need funnel fencing to lead animals to crossing structures, and how long does such fencing have to be? (6) How should we manage/manipulate the environment in the area around the crossing structures and fencing? (7) Where should we place crossing structures and barrier fencing? We provide experimental approaches to answering each of them using example Before-After-Control-Impact (BACI) study designs for two stages in the road/mitigation project where researchers may become involved: (1) at the beginning of a road/mitigation project, and (2) after the mitigation has been constructed; highlighting real case studies when available. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Disaster mitigation action plan: Digital media on improving accountability and community relationships

    NASA Astrophysics Data System (ADS)

    Adila, I.; Dewi, W. W. A.; Tamitiadini, D.; Syauki, W. R.

    2017-06-01

    This study wants to address on how communication science is applied to Disaster Mitigation Plan. Especially, the implementation of Community Media and Development of Communication Technology that synergize to create a Disaster Mitigation Medium, which is appropriate for typology of Indonesia. Various levels of priorities that include disaster mitigation information, namely, increasing chain system of early warning systems, building evacuation, improving alertness and capacity to face a disaster, as well as minimizing disaster risk factor. Through this concept, mitigation actions plan of Tulungagung Coastal areas is expected to be applied in other regions in Indonesia by BNPB (Badan Nasional Penanggulangan Bencana). Having this strategy to be implemented based on region characteristics, it is expected that risk reduction process can be run optimally. As a result, the strategy is known as Community-Based Disaster Risk Reduction (PRBBK), which means as the organized-efforts by society for pra-, during, and post- disaster by using available resources as much as possible to prevent, reduce, avoid, and recover from the impact of disasters. Therefore, this result can be a Pilot Project for BNBP Indonesia, as a government decisive attitude for the next steps in protecting people residing in the region prone to natural disasters all over Indonesia.

  10. CO2 Mitigation Measures of Power Sector and Its Integrated Optimization in China

    PubMed Central

    Dai, Pan; Chen, Guang; Zhou, Hao; Su, Meirong; Bao, Haixia

    2012-01-01

    Power sector is responsible for about 40% of the total CO2 emissions in the world and plays a leading role in climate change mitigation. In this study, measures that lower CO2 emissions from the supply side, demand side, and power grid are discussed, based on which, an integrated optimization model of CO2 mitigation (IOCM) is proposed. Virtual energy, referring to energy saving capacity in both demand side and the power grid, together with conventional energy in supply side, is unified planning for IOCM. Consequently, the optimal plan of energy distribution, considering both economic benefits and mitigation benefits, is figured out through the application of IOCM. The results indicate that development of demand side management (DSM) and smart grid can make great contributions to CO2 mitigation of power sector in China by reducing the CO2 emissions by 10.02% and 12.59%, respectively, in 2015, and in 2020. PMID:23213305

  11. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  12. Sharing international experiences in disasters: summary and action plan.

    PubMed

    Andrews, R A; Austin, C; Brown, R; Chen, Y Z; Engindeniz, Z; Girouard, R; Leaman, P; Masellis, M; Nakayama, S; Polentsov, Y O; Suserud, B O

    2001-01-01

    The discussions in this theme provided an opportunity to share specific experiences with disasters that occurred outside of the Asia-Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 7 and Theme 3 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) disaster response planning, (2) predetermined command and organizational structure, (3) rapid response capability, (4) mitigation, and (5) communications and alternatives. The action plans presented are in common with those presented by Theme 3, and include: (1) plan disaster responses including the different types, identification of hazards, training based on experiences, and provision of public education; (2) improving coordination and control; (3) maintaining communications assuming infrastructure breakdown; (4) maximizing mitigation through standardized evaluations, creation of a legal framework, and recognition of advocacy and public participation; and (5) providing resources and knowledge through access to existing therapies, using the media, and increasing decentralization of hospital inventories. Most of the problems that occurred outside the Asia-Pacific rim relative to disaster management are similar to those experienced within it. They should be addressed in common with the rest of the world.

  13. Harry S. Truman Dam and Reservoir, Missouri, Mitigation of the Adverse Effects Upon the Local Paleontological Resources. Volume 2. Plan Maps of Excavations.

    DTIC Science & Technology

    1983-01-01

    7 A-A147 693 HARRY S TRUMAN D’AM AND RESERVOIR MISSOURI MITIGATION OF 1/ THE ADVERSE EFFEC. .0) ILLINOIS STATE MUSEUM SOCIETY SPRINGFIELD d d...BUREAU OF STANDARDS-.1963-A 1 2 qZTM II 0A MITIGATION OF THE ADVERSE EFFECTS UPON THE LOCAL PALEONTOLOGICAL RESOURCES OF THE HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER BASIN, MISSOURI FINAL REPORT OF FINDINGS VOLUME II: PLAN MAPS OF EXCAVATIONS by Jeffrey J. Saunders, Ph.D. Illinois State Museum

  14. Modeling Techniques for Shipboard Manning: A Review and Plan for Development

    DTIC Science & Technology

    1993-02-01

    manning levels. Once manning models have been created, experiments can be conducted to show how changes in the manning structure might affect ship safety...these predictions, users of the manning models can evaluate how changes in crew configurations, manning levels, and voyage profiles affect ship safety...mitigate emergency situations would provide crucial information on how changes in manning structure would affect overall ship safety. Like emergency

  15. Version 3 of the historical-clinical-risk management-20 (HCR-20V3): relevance to violence risk assessment and management in forensic conditional release contexts.

    PubMed

    Douglas, Kevin S

    2014-09-01

    The conditional release of insanity acquittees requires decisions both about community risk level and the contextual factors that may mitigate or aggravate risk. This article discusses the potential role of the newly revised Historical-Clinical-Risk Management-20 (HCR-20, Version 3) within the conditional release context. A brief review of the structured professional judgment (SPJ) approach to violence risk assessment and management is provided. Version 2 of the HCR-20, which has been broadly adopted and evaluated, is briefly described. New features of Version 3 of the HCR-20 with particular relevance to conditional release decision-making are reviewed, including: item indicators; ratings of the relevance of risk factors to an individual's violence; risk formulation; scenario planning; and risk management planning. Version 3 of the HCR-20 includes a number of features that should assist evaluators and decision-makers to determine risk level, as well as to anticipate and specify community conditions and contexts that may mitigate or aggravate risk. Research on the HCR-20 Version 3 using approximately 800 participants across three settings (forensic psychiatric, civil psychiatric, correctional) and eight countries is reviewed. Copyright © 2014 John Wiley & Sons, Ltd.

  16. Systematic testing of flood adaptation options in urban areas through simulations

    NASA Astrophysics Data System (ADS)

    Löwe, Roland; Urich, Christian; Sto. Domingo, Nina; Mark, Ole; Deletic, Ana; Arnbjerg-Nielsen, Karsten

    2016-04-01

    While models can quantify flood risk in great detail, the results are subject to a number of deep uncertainties. Climate dependent drivers such as sea level and rainfall intensities, population growth and economic development all have a strong influence on future flood risk, but future developments can only be estimated coarsely. In such a situation, robust decision making frameworks call for the systematic evaluation of mitigation measures against ensembles of potential futures. We have coupled the urban development software DAnCE4Water and the 1D-2D hydraulic simulation package MIKE FLOOD to create a framework that allows for such systematic evaluations, considering mitigation measures under a variety of climate futures and urban development scenarios. A wide spectrum of mitigation measures can be considered in this setup, ranging from structural measures such as modifications of the sewer network over local retention of rainwater and the modification of surface flow paths to policy measures such as restrictions on urban development in flood prone areas or master plans that encourage compact development. The setup was tested in a 300 ha residential catchment in Melbourne, Australia. The results clearly demonstrate the importance of considering a range of potential futures in the planning process. For example, local rainwater retention measures strongly reduce flood risk a scenario with moderate increase of rain intensities and moderate urban growth, but their performance strongly varies, yielding very little improvement in situations with pronounced climate change. The systematic testing of adaptation measures further allows for the identification of so-called adaptation tipping points, i.e. levels for the drivers of flood risk where the desired level of flood risk is exceeded despite the implementation of (a combination of) mitigation measures. Assuming a range of development rates for the drivers of flood risk, such tipping points can be translated into anticipated time spans over which a measure will be effective. While the new simulation setup is limited to situations where the planner is able to define realistic ranges for the development of drivers of flood risk, it certainly contributes to an improved consideration of deep uncertainties in the planning process. Future work will particularly focus on the application of the framework in a variety of urban development contexts.

  17. On mitigating rapid onset natural disasters: Project THRUST (Tsunami Hazards Reduction Utilizing Systems Technology)

    NASA Astrophysics Data System (ADS)

    Bernard, E. N.; Behn, R. R.; Hebenstreit, G. T.; Gonzalez, F. I.; Krumpe, P.; Lander, J. F.; Lorca, E.; McManamon, P. M.; Milburn, H. B.

    Rapid onset natural hazards have claimed more than 2.8 million lives worldwide in the past 20 years. This category includes such events as earthquakes, landslides, hurricanes, tornados, floods, volcanic eruptions, wildfires, and tsunamis. Effective hazard mitigation is particularly difficult in such cases, since the time available to issue warnings can be very short or even nonexistent. This paper presents the concept of a local warning system that exploits and integrates the existing technologies of risk evaluation, environmental measurement, and telecommunications. We describe Project THRUST, a successful implementation of this general, systematic approach to tsunamis. The general approach includes pre-event emergency planning, real-time hazard assessment, and rapid warning via satellite communication links.

  18. Success in transmitting hazard science

    NASA Astrophysics Data System (ADS)

    Price, J. G.; Garside, T.

    2010-12-01

    Money motivates mitigation. An example of success in communicating scientific information about hazards, coupled with information about available money, is the follow-up action by local governments to actually mitigate. The Nevada Hazard Mitigation Planning Committee helps local governments prepare competitive proposals for federal funds to reduce risks from natural hazards. Composed of volunteers with expertise in emergency management, building standards, and earthquake, flood, and wildfire hazards, the committee advises the Nevada Division of Emergency Management on (1) the content of the State’s hazard mitigation plan and (2) projects that have been proposed by local governments and state agencies for funding from various post- and pre-disaster hazard mitigation programs of the Federal Emergency Management Agency. Local governments must have FEMA-approved hazard mitigation plans in place before they can receive this funding. The committee has been meeting quarterly with elected and appointed county officials, at their offices, to encourage them to update their mitigation plans and apply for this funding. We have settled on a format that includes the county’s giving the committee an overview of its infrastructure, hazards, and preparedness. The committee explains the process for applying for mitigation grants and presents the latest information that we have about earthquake hazards, including locations of nearby active faults, historical seismicity, geodetic strain, loss-estimation modeling, scenarios, and documents about what to do before, during, and after an earthquake. Much of the county-specific information is available on the web. The presentations have been well received, in part because the committee makes the effort to go to their communities, and in part because the committee is helping them attract federal funds for local mitigation of not only earthquake hazards but also floods (including canal breaches) and wildfires, the other major concerns in Nevada. Local citizens appreciate the efforts of the state officials to present the information in a public forum. The Committee’s earthquake presentations to the counties are supplemented by regular updates in the two most populous counties during quarterly meetings of the Nevada Earthquake Safety Council, generally alternating between Las Vegas and Reno. We have only 17 counties in Nevada, so we are making good progress at reaching each within a few years. The Committee is also learning from the county officials about their frustrations in dealing with the state and federal bureaucracies. Success is documented by the mitigation projects that FEMA has funded.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fred D. Brent; Lalit Shah; Earl Berry

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less

  20. Goals, obstacles and effective strategies of wildfire mitigation programs in the Wildland-Urban Interface

    Treesearch

    Margaret A. Reams; Terry K. Haines; Cheryl R. Renner; Michael W. Wascom; Harish Kingre

    2005-01-01

    The dramatic expansion into the Wildland–Urban Interface (WUI) places property, natural assets, and human life at risk from wildfire destruction. The U.S. National Fire Plan encourages communities to implement laws and outreach programs for pre-fire planning to mitigate the risk to area residents. Starting in 2003, we surveyed the administrators of regulatory and...

  1. Appalachian Stream Mitigation Workshop

    EPA Pesticide Factsheets

    A 5 day workshop in 2011 developed for state and federal regulatory and resource agencies, who review, comment on and/or approve compensatory mitigation plans for surface coal mining projects in Appalachia

  2. State survey of medical boards regarding abrupt loss of a prescriber of controlled substances.

    PubMed

    Sera, Leah; Brown, Micke; McPherson, Mary Lynn; Walker, Kathryn A; Klein-Schwartz, Wendy

    The purpose of the study was to evaluate states' experiences with abrupt changes in controlled substances (CS) prescribing, to determine whether states have action plans in place to manage such situations, and describe the components of any such plans. A survey of executive directors of 51 medical boards was conducted to evaluate states' experiences with abrupt changes in CS prescribing, the extent of consumer complaints attributed to these events, and the types of plans in place to manage these situations. Forty-six executive directors of medical boards responded. Twenty boards (43.5 percent) confirmed that their state had experienced abrupt loss of CS providers and 11 (55 percent) of these executive directors indicated that the loss resulted in increased consumer complaints. The majority of executive directors (86 percent) had no action plan. Six executive directors reported some type of action plan or process consisting of regulatory action, patient-provider connection, professional education, patient education, or public notice. Most states do not have operational plans in place. However, a few have key strategies that may be useful in addressing potential problems following abrupt loss of a CS prescriber. State medical boards can play a significant role in the development of comprehensive preparedness plans to mitigate damage from the loss of CS prescribers in the community.

  3. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  4. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; andmore » analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.« less

  5. 30 CFR 250.223 - What mitigation measures information must accompany the EP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the EP? 250.223 Section 250.223 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Contents of Exploration Plans (ep) § 250.223 What mitigation measures information must accompany the EP? (a...

  6. Alternative Fuels Data Center

    Science.gov Websites

    establishing a plan to allocate any funds the State receives from the Volkswagen Mitigation Trust Agreement Volkswagen Mitigation Trust Agreement; to offset oxides of nitrogen emissions from vehicles. For more

  7. 44 CFR 201.6 - Local Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agencies that have the authority to regulate development, as well as businesses, academia and other private... and development trends within the community so that mitigation options can be considered in future...

  8. Cumulative biological impacts framework for solar energy projects in the California Desert

    USGS Publications Warehouse

    Davis, Frank W.; Kreitler, Jason R.; Soong, Oliver; Stoms, David M.; Dashiell, Stephanie; Hannah, Lee; Wilkinson, Whitney; Dingman, John

    2013-01-01

    This project developed analytical approaches, tools and geospatial data to support conservation planning for renewable energy development in the California deserts. Research focused on geographical analysis to avoid, minimize and mitigate the cumulative biological effects of utility-scale solar energy development. A hierarchical logic model was created to map the compatibility of new solar energy projects with current biological conservation values. The research indicated that the extent of compatible areas is much greater than the estimated land area required to achieve 2040 greenhouse gas reduction goals. Species distribution models were produced for 65 animal and plant species that were of potential conservation significance to the Desert Renewable Energy Conservation Plan process. These models mapped historical and projected future habitat suitability using 270 meter resolution climate grids. The results were integrated into analytical frameworks to locate potential sites for offsetting project impacts and evaluating the cumulative effects of multiple solar energy projects. Examples applying these frameworks in the Western Mojave Desert ecoregion show the potential of these publicly-available tools to assist regional planning efforts. Results also highlight the necessity to explicitly consider projected land use change and climate change when prioritizing areas for conservation and mitigation offsets. Project data, software and model results are all available online.

  9. The use of regional advance mitigation planning (RAMP) to integrate transportation infrastructure impacts with sustainability; a perspective from the USA

    NASA Astrophysics Data System (ADS)

    Thorne, James H.; Huber, Patrick R.; O'Donoghue, Elizabeth; Santos, Maria J.

    2014-05-01

    Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411-3490 ha of habitat supporting 30-43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas.

  10. Mitigating Surprise Through Enhanced Operational Design: Civilian Conceptual Planning Models

    DTIC Science & Technology

    2007-01-01

    political, historical, cultural , and economic contexts. If we are going to fight among the people, we must understand them.1 When evaluating US military...represents both the Christian and Yoruba minorities as well as the military, continues to compete against rival elites representing disparate elements...undeniably have to learn a new culture , the physical battlespace would not be alien since MS-13 maintains a large presence in areas that are home to

  11. Application of remote sensing technology to land evaluation, planning utilization of land resources, and assessment of wildlife areas in eastern South Dakota

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A soils map for land evaluation in Potter County (Eastern South Dakota) was developed to demonstrate the use of remote sensing technology in the area of diverse parent materials and topography. General land use and soils maps have also been developed for land planning LANDSAT, RB-57 imagery, and USGS photographs are being evaluated for making soils and land use maps. LANDSAT fulfilled the requirements for general land use and a general soils map. RB-57 imagery supplemented by large scale black and white stereo coverage was required to provide the detail needed for the final soils map for land evaluation. Color infrared prints excelled black and white coverage for this soil mapping effort. An identification and classification key for wetland types in the Lake Dakota Plain was developed for June 1975 using color infrared imagery. Wetland types in the region are now being mapped via remote sensing techniques to provide a current inventory for development of mitigation measures.

  12. Environmental impact assessment of structural flood mitigation measures by a rapid impact assessment matrix (RIAM) technique: a case study in Metro Manila, Philippines.

    PubMed

    Gilbuena, Romeo; Kawamura, Akira; Medina, Reynaldo; Amaguchi, Hideo; Nakagawa, Naoko; Bui, Duong Du

    2013-07-01

    In recent decades, the practice of environmental impact assessment (EIA) in the planning processes of infrastructure projects has created significant awareness on the benefits of environmentally sound and sustainable urban development around the world. In the highly urbanized megacities in the Philippines, like Metro Manila, high priority is given by the national government to structural flood mitigation measures (SFMM) due to the persistently high frequency of flood-related disasters, which are exacerbated by the on-going effects of climate change. EIA thus, should be carefully and effectively executed to maximize the potential benefits of the SFMM. The common practice of EIA in the Philippines is generally qualitative and lacks clear methodology in evaluating multi-criteria systems. Thus, this study proposes the use of the rapid impact assessment matrix (RIAM) technique to provide a method that would systematically and quantitatively evaluate the socio-economic and environmental impacts of planned SFMM in Metro Manila. The RIAM technique was slightly modified to fit the requirements of this study. The scale of impact was determined for each perceived impact, and based on the results, the planned SFMM for Metro Manila will likely bring significant benefits; however, significant negative impacts may also likely occur. The proposed modifications were found to be highly compatible with RIAM, and the results of the RIAM analysis provided a clear view of the impacts associated with the implementation of SFMM projects. This may prove to be valuable in the practice of EIA in the Philippines. Copyright © 2013 Elsevier B.V. All rights reserved.

  13. Review of dust transport and mitigation technologies in lunar and Martian atmospheres

    NASA Astrophysics Data System (ADS)

    Afshar-Mohajer, Nima; Wu, Chang-Yu; Curtis, Jennifer Sinclair; Gaier, James R.

    2015-09-01

    Dust resuspension and deposition is a ubiquitous phenomenon in all lunar and Martian missions. The near-term plans to return to the Moon as a stepping stone to further exploration of Mars and beyond bring scientists' attention to development and evaluation of lunar and Martian dust mitigation technologies. In this paper, different lunar and Martian dust transport mechanisms are presented, followed by a review of previously developed dust mitigation technologies including fluidal, mechanical, electrical and passive self-cleaning methods for lunar/Martian installed surfaces along with filtration for dust control inside cabins. Key factors in choosing the most effective dust mitigation technology are recognized to be the dust transport mechanism, energy consumption, environment, type of surface materials, area of the surface and surface functionality. While electrical methods operating at higher voltages are identified to be suitable for small but light sensitive surfaces, pre-treatment of the surface is effective for cleaning thermal control surfaces, and mechanical methods are appropriate for surfaces with no concerns of light blockage, surface abrasion and 100% cleaning efficiency. Findings from this paper can help choose proper surface protection/cleaning for future space explorations. Hybrid techniques combining the advantages of different methods are recommended.

  14. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  15. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  16. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  17. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  18. Developing a congestion mitigation toolbox.

    DOT National Transportation Integrated Search

    2011-09-30

    Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference for practitioners and an educational tool for elected officials acting through public policy boards to better understand the development, planning,...

  19. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  20. Response to the 2011 Great East Japan Earthquake and Tsunami disaster.

    PubMed

    Koshimura, Shunichi; Shuto, Nobuo

    2015-10-28

    We revisited the lessons of the 2011 Great East Japan Earthquake Tsunami disaster specifically on the response and impact, and discussed the paradigm shift of Japan's tsunami disaster management policies and the perspectives for reconstruction. Revisiting the modern histories of Tohoku tsunami disasters and pre-2011 tsunami countermeasures, we clarified how Japan's coastal communities have prepared for tsunamis. The discussion mainly focuses on structural measures such as seawalls and breakwaters and non-structural measures of hazard map and evacuation. The responses to the 2011 event are discussed specifically on the tsunami warning system and efforts to identify the tsunami impacts. The nation-wide post-tsunami survey results shed light on the mechanisms of structural destruction, tsunami loads and structural vulnerability to inform structural rehabilitation measures and land-use planning. Remarkable paradigm shifts in designing coastal protection and disaster mitigation measures were introduced, leading with a new concept of potential tsunami levels: Prevention (Level 1) and Mitigation (Level 2) levels according to the level of 'protection'. The seawall is designed with reference to Level 1 tsunami scenario, while comprehensive disaster management measures should refer to Level 2 tsunami for protection of human lives and reducing potential losses and damage. Throughout the case study in Sendai city, the proposed reconstruction plan was evaluated from the tsunami engineering point of view to discuss how the post 2011 paradigm was implemented in coastal communities for future disaster mitigation. The analysis revealed that Sendai city's multiple protection measures for Level 2 tsunami will contribute to a substantial reduction of the tsunami inundation zone and potential losses, combined with an effective tsunami evacuation plan. © 2015 The Author(s).

  1. Integrating ecosystem-service tradeoffs into land-use decisions

    PubMed Central

    Goldstein, Joshua H.; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C.

    2012-01-01

    Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O’ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests. PMID:22529388

  2. Integrating ecosystem-service tradeoffs into land-use decisions.

    PubMed

    Goldstein, Joshua H; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C

    2012-05-08

    Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O'ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests.

  3. Strategic Environmental Assessment of Greenhouse Gas Mitigation Options in the Canadian Agricultural Sector

    NASA Astrophysics Data System (ADS)

    Noble, Bram F.; Christmas, Lisa M.

    2008-01-01

    This article presents a methodological framework for strategic environmental assessment (SEA) application. The overall objective is to demonstrate SEA as a systematic and structured policy, plan, and program (PPP) decision support tool. In order to accomplish this objective, a stakeholder-based SEA application to greenhouse gas (GHG) mitigation policy options in Canadian agriculture is presented. Using a mail-out impact assessment exercise, agricultural producers and nonproducers from across the Canadian prairie region were asked to evaluate five competing GHG mitigation options against 13 valued environmental components (VECs). Data were analyzed using multi-criteria and exploratory analytical techniques. The results suggest considerable variation in perceived impacts and GHG mitigation policy preferences, suggesting that a blanket policy approach to GHG mitigation will create gainers and losers based on soil type and associate cropping and on-farm management practices. It is possible to identify a series of regional greenhouse gas mitigation programs that are robust, socially meaningful, and operationally relevant to both agricultural producers and policy decision makers. The assessment demonstrates the ability of SEA to address, in an operational sense, environmental problems that are characterized by conflicting interests and competing objectives and alternatives. A structured and systematic SEA methodology provides the necessary decision support framework for the consideration of impacts, and allows for PPPs to be assessed based on a much broader set of properties, objectives, criteria, and constraints whereas maintaining rigor and accountability in the assessment process.

  4. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less

  5. A Michigan toolbox for mitigating traffic congestion.

    DOT National Transportation Integrated Search

    2011-09-30

    "Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference : for practitioners and an educational tool for elected officials acting through public policy boards to better : understand the development, plan...

  6. Implementing drought early warning systems: policy lessons and future needs

    NASA Astrophysics Data System (ADS)

    Iglesias, Ana; Werner, Micha; Maia, Rodrigo; Garrote, Luis; Nyabeze, Washington

    2014-05-01

    Drought forecasting and Warning provides the potential of reducing impacts to society due to drought events. The implementation of effective drought forecasting and warning, however, requires not only science to support reliable forecasting, but also adequate policy and societal response. Here we propose a protocol to develop drought forecasting and early warning based in the international cooperation of African and European institutions in the DEWFORA project (EC, 7th Framework Programme). The protocol includes four major phases that address the scientific knowledge and the social capacity to use the knowledge: (a) What is the science available? Evaluating how signs of impending drought can be detected and predicted, defining risk levels, and analysing of the signs of drought in an integrated vulnerability approach. (b) What are the societal capacities? In this the institutional framework that enables policy development is evaluated. The protocol gathers information on vulnerability and pending hazard in advance so that early warnings can be declared at sufficient lead time and drought mitigation planning can be implemented at an early stage. (c) How can science be translated into policy? Linking science indicators into the actions/interventions that society needs to implement, and evaluating how policy is implemented. Key limitations to planning for drought are the social capacities to implement early warning systems. Vulnerability assessment contributes to identify these limitations and therefore provides crucial information to policy development. Based on the assessment of vulnerability we suggest thresholds for management actions to respond to drought forecasts and link predictive indicators to relevant potential mitigation strategies. Vulnerability assessment is crucial to identify relief, coping and management responses that contribute to a more resilient society. (d) How can society benefit from the forecast? Evaluating how information is provided to potentially affected groups, and how mitigation strategies can be taken in response. This paper presents an outline of the protocol that was developed in the DEWFORA project, outlining the complementary roles of science, policy and societal uptake in effective drought forecasting and warning. A consensus on the need to emphasise the social component of early warning was reached when testing the DEWFORA early warning system protocol among experts from 18 countries.

  7. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands... AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.15 Planning and management techniques applicable to the plan. The Commission recognizes that there are a wide range of techniques that...

  8. Improving Empirical Approaches to Estimating Local Greenhouse Gas Emissions

    NASA Astrophysics Data System (ADS)

    Blackhurst, M.; Azevedo, I. L.; Lattanzi, A.

    2016-12-01

    Evidence increasingly indicates our changing climate will have significant global impacts on public health, economies, and ecosystems. As a result, local governments have become increasingly interested in climate change mitigation. In the U.S., cities and counties representing nearly 15% of the domestic population plan to reduce 300 million metric tons of greenhouse gases over the next 40 years (or approximately 1 ton per capita). Local governments estimate greenhouse gas emissions to establish greenhouse gas mitigation goals and select supporting mitigation measures. However, current practices produce greenhouse gas estimates - also known as a "greenhouse gas inventory " - of empirical quality often insufficient for robust mitigation decision making. Namely, current mitigation planning uses sporadic, annual, and deterministic estimates disaggregated by broad end use sector, obscuring sources of emissions uncertainty, variability, and exogeneity that influence mitigation opportunities. As part of AGU's Thriving Earth Exchange, Ari Lattanzi of City of Pittsburgh, PA recently partnered with Dr. Inez Lima Azevedo (Carnegie Mellon University) and Dr. Michael Blackhurst (University of Pittsburgh) to improve the empirical approach to characterizing Pittsburgh's greenhouse gas emissions. The project will produce first-order estimates of the underlying sources of uncertainty, variability, and exogeneity influencing Pittsburgh's greenhouse gases and discuss implications of mitigation decision making. The results of the project will enable local governments to collect more robust greenhouse gas inventories to better support their mitigation goals and improve measurement and verification efforts.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  10. A Mitigation Process for Impacts of the All American Pipeline on Oak Woodlands in Santa Barbara County

    Treesearch

    Germaine Reyes-French; Timothy J. Cohen

    1991-01-01

    This paper outlines a mitigation program for pipeline construction impacts to oak tree habitat by describing the requirements for the Offsite Oak Mitigation Program for the All American Pipeline (AAPL) in Santa Barbara County, California. After describing the initial environmental analysis, the County regulatory structure is described under which the plan was required...

  11. 43 CFR 10005.17 - Plan development process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of the...

  12. Modelling farm vulnerability to flooding: A step toward vulnerability mitigation policies appraisal

    NASA Astrophysics Data System (ADS)

    Brémond, P.; Abrami, G.; Blanc, C.; Grelot, F.

    2009-04-01

    Recent catastrophic flood events such as Elbe in 2002 or Rhône in 2003 have shown limits of flood management policies relying on dykes protection: worsening of flood impacts downstream, increased damage by dykes rupture. Those events, among others, contributes to radical changes on the philosophy of flood prevention, with the promotion of new orientations for mitigating flood exposition. Two new trends may have a significant impact on rural areas: floodplain restoration and vulnerability mitigation. The Rhône River program, which is an contract of objectives signed between French Government and local collectivites, is highly illustrative of these new trends and their impact on agricultural sector. In this program, it appears that areas to be concerned by floodplain restoration are agricultural ones, because their supposed vulnerability to flood is expected to be less important to urban areas. As a consequence, agricultural sector is particularly concerned by planned actions on mitigation of assets vulnerability, an important part of the program (financial support of European Union of 7.5 Million euros). Mitigation of agricultural assets vulnerability reveals particularly interesting for two following reasons. Firstly, it is a way to maintain agricultural activities in floodplains yet existing, without promoting flood protection. Secondly, in case of floodplain restoration, vulnerability mitigation is a way for local authorities to compensate over-flooding impacts. In practice, local authorities may financially support farmers for implementing measures to mitigate their farm vulnerability. On the Rhône River, an important work has already been done to identify farm vulnerability to flooding, and propose measures to mitigate it. More than 3 000 farms exposed to flood risk have been identified representing 88 690 ha of agricultural areas which is estimated to generate damage between 400 and 800 Million euros depending on the season of occurrence for a catastrophic flood. In the case of farm activities, vulnerability mitigation consists in implementing measures which can be: physical (equipment or electric power system elevation), organizational (emergency or recovery plan) or financial (insurance). These measures aim at decreasing the total damage incurred by farmers in case of flooding. For instance, if equipment is elevated, it will not suffer direct damage such as degradation. As a consequence, equipment will be available to continue production or recovery tasks, thus, avoiding indirect damage such as delays, indebtedness… The effects of these policies on farms, in particular vulnerability mitigation cannot be appraised using current methodologies mainly because they do not consider farm as a whole and focus on direct damage at the land plot scale (loss of yield). Moreover, since vulnerability mitigation policies are quite recent, few examples of implementation exist and no feedback experience can be processed. Meanwhile, decision makers and financial actors require more justification of the efficiency of public fund by economic appraisal of the projects. On the Rhône River, decision makers asked for an economic evaluation of the program of farm vulnerability mitigation they plan to implement. This implies to identify the effects of the measures to mitigate farm vulnerability, and to classify them by comparing their efficacy (avoided damage) and their cost of implementation. In this presentation, we propose and discuss a conceptual model of vulnerability at the farm scale. The modelling, in Unified Modelling Language, enabled to represent the ties between spatial, organizational and temporal dimensions, which are central to understanding of farm vulnerability and resilience to flooding. Through this modelling, we encompass three goals: To improve the comprehension of farm vulnerability and create a framework that allow discussion with experts of different disciplines as well as with local farmers; To identify data which are needed to implement the model and to collect them, specifically using the focus group method; Based on the conceptual model, to program a mathematical model which will be used to simulate damage (direct and indirect) on farm due to flood. This last objective should enable us to appraise policy to mitigate vulnerability which is planned to be implemented on Rhône River at the individual and regional scale. Finally, we discuss the possibility to use the UML modelling to develop a multi-agent system approach which could be interesting to take into account ties between farmers (solidarity, loan of equipment) or systemic effects due to the damage incurred by economic partners (loss of market share). Keywords vulnerability, UML modelling, farming systems, flood, mitigation policy, economic valuation

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  14. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    PubMed Central

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  15. Lunar Dust Mitigation Technology Development

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Deluane, Paul B.

    2008-01-01

    NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

  16. Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation.

    PubMed

    Kennedy, Christina M; Miteva, Daniela A; Baumgarten, Leandro; Hawthorne, Peter L; Sochi, Kei; Polasky, Stephen; Oakleaf, James R; Uhlhorn, Elizabeth M; Kiesecker, Joseph

    2016-07-01

    Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development.

  17. Determination of Section 404 Permit and Habitat Mitigation Requirements

    DOT National Transportation Integrated Search

    2012-09-01

    The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...

  18. 76 FR 68745 - Notice of Intent To Update the Upland Erosion Control and Revegetation and Maintenance Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... Waterbody Construction and Mitigation Procedures and Request for Comments The staff of the Office of Energy...) and Wetland and Waterbody Construction and Mitigation Procedures (Procedures), dated January 17, 2003...

  19. Trial by fire: Community Wildfire Protection Plans put to the test

    Treesearch

    Pamela J. Jakes; Victoria Sturtevant

    2013-01-01

    Research has found that community wildfire protection planning can make significant contributions to wildfire mitigation and preparedness, but can the planning process and resulting Community Wildfire Protection Plans make a difference to wildfire response and recovery? In case studies conducted in four USA communities with Community Wildfire Protection Plans in place...

  20. Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1996 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carty, Daniel; Knoetek, W. Ladd

    1997-06-01

    Kokanee salmon Oncorhynchus nerka were introduced into Flathead Lake in 1916. The kokanee population declined in the 1960s and 1970s, and kokanee disappeared from Flathead Lake in the late 1980s. Their disappearance has been attributed to the long-term effects of the construction and operation of Hungry Horse and Kerr dams, excessive harvest by anglers, and changes in the lake food web induced by the introduction of opossum shrimp Mysis relicta. Attempts to reestablish kokanee in the Flathead Lake ecosystem between 1988 and 1991 were unsuccessful. In 1991, Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribesmore » (CSKT) wrote a mitigation plan to restore kokanee to Flathead Lake. In 1993, MFWP, CSKT, and the U.S. Fish and Wildlife Service wrote a mitigation implementation plan that initiated a 5-year test program to use hatchery-reared fish to reintroduce kokanee to the lake. Stocking hatchery-reared kokanee into Flathead Lake began in 1993; the 5-year {open_quotes}kokanee test{close_quotes} started in 1994 and is scheduled to continue through 1998. The annual stocking objective is 1 million yearling kokanee (6-8 in long). Criteria used to evaluate the success of the 5-year test are (1) 30% survival of kokanee 1 year after stocking, (2) yearling-to-adult survival of 10%, and (3) annual harvest of 50,000 kokanee ({ge} 11 in) and fishing effort {ge} 100,000 angler hours.« less

  1. Risk evaluation and mitigation strategies: a focus on belatacept.

    PubMed

    Sam, Teena; Gabardi, Steven; Tichy, Eric M

    2013-03-01

    To review the elements and components of the risk evaluation and mitigation strategies (REMS) for the costimulation blocker belatacept and associated implications for health care providers working with transplant recipients. The MEDLINE and EMBASE databases (January 1990 to March 2012) were searched by using risk evaluation and mitigation strategies, REMS, belatacept, and organ transplant as search terms (individual organs were also searched). Retrieved articles were supplemented with analysis of information obtained from the Federal Register, the Food and Drug Administration, and the manufacturer of belatacept. REMS are risk-management strategies implemented to ensure that a product's benefits outweigh its known safety risks. Although belatacept offers a novel strategy in maintenance immunosuppression and was associated with superior renal function compared with cyclosporine in phase 2 and 3 trials, belatacept is also associated with increased risk of posttransplant lymphoproliferative disorder and central nervous system infections. The Food and Drug Administration required development of a REMS program as part of belatacept's approval process to ensure safe and appropriate use of the medication and optimization of its risk-benefit profile. Elements of the belatacept REMS include a medication guide that must be dispensed with each infusion and a communication plan. In the management of a complex population of patients, it is essential that those who care for transplant recipients, and patients, recognize the implications of potential and known risks of belatacept. The REMS program aims to facilitate careful selection and education of patients and vigilant monitoring.

  2. Interdependencies and Risks at the Nexus of Energy, Water, and Land Systems

    NASA Astrophysics Data System (ADS)

    Geernaert, G. L.

    2016-12-01

    During recent years, the federal agencies have rallied around efforts to understand and predict the interdependencies involving various combinations of energy infrastructure and supply, water supply and quality, and land use that combines agriculture and food production. The US Department of Energy has, in particular, focused on the energy-water nexus, with specific goals to understand the degree of interdependence that leads to multi-sector risk and, in the worst case, the precursors that can lead to cascading failure. Determining thresholds for system interdependence, evaluating the impact of drought on systems, and planning for robust mitigation options to avert future risks, are among DOE's highest research priorities. In this presentation, the DOE program plan and its rationale will be described; and the DOE plan will be placed in context of broader efforts across the federal government.

  3. Risk evaluation and mitigation strategies: a focus on the mammalian target of rapamycin inhibitors.

    PubMed

    Gabardi, Steven

    2013-03-01

    To review the history of risk evaluation and mitigation strategies (REMS) with the mammalian target of rapamycin (mToR) inhibitors, evaluate their required REMS elements, and delineate the reasons for them being released from their REMS requirements. Articles were identified through a literature search of MEDLINE and EMBASE (January 2007-July 2012) using the search terms: risk evaluation and mitigation strategies, REMS, everolimus, sirolimus and organ transplant (individual organs also were searched). Information from the Federal Register, the Food and Drug Administration, and the manufacturers of the mToR inhibitors was also evaluated. REMS are strategies implemented to manage known or potential risks associated with medications and to ensure ongoing pharmacovigilance throughout the life of a pharmaceutical product. The mToR inhibitors have been associated with several potential risks, including proteinuria, graft thrombosis, and wound-healing complications. The Food and Drug Administration approved REMS programs for both sirolimus and everolimus. The manufacturers of both medications complied with the components of their approved REMS, but after less than 2 years, both medications have been relieved of their REMS obligations. The only element of the sirolimus REMS was a medication guide, whereas the everolimus REMS consisted of a medication guide and a communication plan. The sirolimus REMS was implemented more than 10 years after its initial approval by the Food and Drug Administration, but was released from its REMS requirement within 7 months of its implementation. The everolimus REMS was instituted upon initial approval and was removed approximately 2 years later. Both medications' REMS were always intended to educate health care providers and patients about the potential risks associated with this transplant immunosuppressant. Transplant practitioners should be familiar with the mToR inhibitors' associated risks and properly educate patients regarding the inhibitors' risk-benefit profiles.

  4. Planning for Crew Exercise for Deep Space Mission Scenarios

    NASA Technical Reports Server (NTRS)

    Moore, E. Cherice; Ryder, Jeff

    2015-01-01

    Exercise which is necessary for maintaining crew health on-orbit and preparing the crew for return to 1G can be challenging to incorporate into spaceflight vehicles. Deep space missions will require further understanding of the physiological response to microgravity, understanding appropriate mitigations, and designing the exercise systems to effectively provide mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.

  5. The advantage of calculating emission reduction with local emission factor in South Sumatera region

    NASA Astrophysics Data System (ADS)

    Buchari, Erika

    2017-11-01

    Green House Gases (GHG) which have different Global Warming Potential, usually expressed in CO2 equivalent. German has succeeded in emission reduction of CO2 in year 1990s, while Japan since 2001 increased load factor of public transports. Indonesia National Medium Term Development Plan, 2015-2019, has set up the target of minimum 26% and maximum 41% National Emission Reduction in 2019. Intergovernmental Panel on Climate Change (IPCC), defined three types of accuracy in counting emission of GHG, as tier 1, tier 2, and tier 3. In tier 1, calculation is based on fuel used and average emission (default), which is obtained from statistical data. While in tier 2, calculation is based fuel used and local emission factors. Tier 3 is more accurate from those in tier 1 and 2, and the calculation is based on fuel used from modelling method or from direct measurement. This paper is aimed to evaluate the calculation with tier 2 and tier 3 in South Sumatera region. In 2012, Regional Action Plan for Greenhouse Gases of South Sumatera for 2020 is about 6,569,000 ton per year and with tier 3 is about without mitigation and 6,229,858.468 ton per year. It was found that the calculation in tier 3 is more accurate in terms of fuel used of variation vehicles so that the actions of mitigation can be planned more realistically.

  6. Vegetation and other development options for mitigating urban air pollution impacts

    EPA Science Inventory

    In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...

  7. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  8. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  9. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  10. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  11. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  12. Forecasting techno-social systems: how physics and computing help to fight off global pandemics

    NASA Astrophysics Data System (ADS)

    Vespignani, Alessandro

    2010-03-01

    The crucial issue when planning for adequate public health interventions to mitigate the spread and impact of epidemics is risk evaluation and forecast. This amount to the anticipation of where, when and how strong the epidemic will strike. In the last decade advances in performance in computer technology, data acquisition, statistical physics and complex networks theory allow the generation of sophisticated simulations on supercomputer infrastructures to anticipate the spreading pattern of a pandemic. For the first time we are in the position of generating real time forecast of epidemic spreading. I will review the history of the current H1N1 pandemic, the major road-blocks the community has faced in its containment and mitigation and how physics and computing provide predictive tools that help us to battle epidemics.

  13. 75 FR 54026 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil. The... establish evidence that they have properly planned to mitigate oil outflow and to provide that information...

  14. Using Machine Learning for Behavior-Based Access Control: Scalable Anomaly Detection on TCP Connections and HTTP Requests

    DTIC Science & Technology

    2013-11-01

    machine learning techniques used in BBAC to make predictions about the intent of actors establishing TCP connections and issuing HTTP requests. We discuss pragmatic challenges and solutions we encountered in implementing and evaluating BBAC, discussing (a) the general concepts underlying BBAC, (b) challenges we have encountered in identifying suitable datasets, (c) mitigation strategies to cope...and describe current plans for transitioning BBAC capabilities into the Department of Defense together with lessons learned for the machine learning

  15. Effectiveness of different rescanning techniques for scanned proton radiotherapy in lung cancer patients

    NASA Astrophysics Data System (ADS)

    Engwall, E.; Glimelius, L.; Hynning, E.

    2018-05-01

    Non-small cell lung cancer (NSCLC) is a tumour type thought to be well-suited for proton radiotherapy. However, the lung region poses many problems related to organ motion and can for actively scanned beams induce severe interplay effects. In this study we investigate four mitigating rescanning techniques: (1) volumetric rescanning, (2) layered rescanning, (3) breath-sampled (BS) layered rescanning, and (4) continuous breath-sampled (CBS) layered rescanning. The breath-sampled methods will spread the layer rescans over a full breathing cycle, resulting in an improved averaging effect at the expense of longer treatment times. In CBS, we aim at further improving the averaging by delivering as many rescans as possible within one breathing cycle. The interplay effect was evaluated for 4D robustly optimized treatment plans (with and without rescanning) for seven NSCLC patients in the treatment planning system RayStation. The optimization and final dose calculation used a Monte Carlo dose engine to account for the density heterogeneities in the lung region. A realistic treatment delivery time structure given from the IBA ScanAlgo simulation tool served as basis for the interplay evaluation. Both slow (2.0 s) and fast (0.1 s) energy switching times were simulated. For all seven studied patients, rescanning improves the dose conformity to the target. The general trend is that the breath-sampled techniques are superior to layered and volumetric rescanning with respect to both target coverage and variability in dose to OARs. The spacing between rescans in our breath-sampled techniques is set at planning, based on the average breathing cycle length obtained in conjunction with CT acquisition. For moderately varied breathing cycle lengths between planning and delivery (up to 15%), the breath-sampled techniques still mitigate the interplay effect well. This shows the potential for smooth implementation at the clinic without additional motion monitoring equipment.

  16. Preparing for Euro 2012: developing a hazard risk assessment.

    PubMed

    Wong, Evan G; Razek, Tarek; Luhovy, Artem; Mogilevkina, Irina; Prudnikov, Yuriy; Klimovitskiy, Fedor; Yutovets, Yuriy; Khwaja, Kosar A; Deckelbaum, Dan L

    2015-04-01

    Risk assessment is a vital step in the disaster-preparedness continuum as it is the foundation of subsequent phases, including mitigation, response, and recovery. To develop a risk assessment tool geared specifically towards the Union of European Football Associations (UEFA) Euro 2012. In partnership with the Donetsk National Medical University, Donetsk Research and Development Institute of Traumatology and Orthopedics, Donetsk Regional Public Health Administration, and the Ministry of Emergency of Ukraine, a table-based tool was created, which, based on historical evidence, identifies relevant potential threats, evaluates their impacts and likelihoods on graded scales based on previous available data, identifies potential mitigating shortcomings, and recommends further mitigation measures. This risk assessment tool has been applied in the vulnerability-assessment-phase of the UEFA Euro 2012. Twenty-three sub-types of potential hazards were identified and analyzed. Ten specific hazards were recognized as likely to very likely to occur, including natural disasters, bombing and blast events, road traffic collisions, and disorderly conduct. Preventative measures, such as increased stadium security and zero tolerance for impaired driving, were recommended. Mitigating factors were suggested, including clear, incident-specific preparedness plans and enhanced inter-agency communication. This hazard risk assessment tool is a simple aid in vulnerability assessment, essential for disaster preparedness and response, and may be applied broadly to future international events.

  17. Localizing Climate Information for Municipal Planning in the Central U.S.

    NASA Astrophysics Data System (ADS)

    Shulski, M.; Umphlett, N.; Abdel-Monem, T.; Tang, Z.; Uhlarik, F.

    2017-12-01

    The impacts of projected climate change are an ongoing concern for municipalities. Planning at the local level often involves investigations of multiple hazards on decadal timescales. Of particular interest to cities are implications of too much or too little water, snow storms, heat waves, and freeze/thaw cycles on infrastructure, health, energy demands and water quality and availability. A two-year project led by the University of Nebraska - Lincoln has brought together scientist and stakeholder for the purpose of informing municipal planning and climate adaptation for 12 cities in the lower Missouri River Basin states (IA, NE, KS, MO). City-specific climate reports have been developed with municipal input to aid local planning efforts. Surveys to assess municipal climate data usage were distributed to all cities with a population greater than 5,000 in the four-state region. In addition, planning efforts for 18 municipalities have been evaluated for nearly 20 cities in the region to investigate local hazard mitigation, emergency, and comprehensive plans. This presentation will outline key outcomes of the project and discuss decision support tools developed in co-production with city planners.

  18. A Comprehensive Approach to Emergency Planning

    ERIC Educational Resources Information Center

    Worsley, Tracy L.; Beckering, Don

    2007-01-01

    It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…

  19. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  20. Participatory planning of interventions to mitigate human-wildlife conflicts.

    PubMed

    Treves, Adrian; Wallace, R B; White, S

    2009-12-01

    Conservation of wildlife is especially challenging when the targeted species damage crops or livestock, attack humans, or take fish or game. Affected communities may retaliate and destroy wildlife or their habitats. We summarize recommendations from the literature for 13 distinct types of interventions to mitigate these human-wildlife conflicts. We classified eight types as direct (reducing the severity or frequency of encounters with wildlife) and five as indirect (raising human tolerance for encounters with wildlife) interventions. We analyzed general cause-and-effect relationships underlying human-wildlife conflicts to clarify the focal point of intervention for each type. To organize the recommendations on interventions we used three standard criteria for feasibility: cost-effective design, wildlife specificity and selectivity, and sociopolitical acceptability. The literature review and the feasibility criteria were integrated as decision support tools in three multistakeholder workshops. The workshops validated and refined our criteria and helped the participants select interventions. Our approach to planning interventions is systematic, uses standard criteria, and optimizes the participation of experts, policy makers, and affected communities. We argue that conservation action generally will be more effective if the relative merits of alternative interventions are evaluated in an explicit, systematic, and participatory manner.

  1. 0-6762 : maximizing mitigation benefits-making a difference with strategic inter-resource agency planning.

    DOT National Transportation Integrated Search

    2014-08-01

    Transportation agencies do their best to avoid : and minimize any impacts to the environment, : but some impacts are unavoidable. : Compensatory mitigation is used to offset these : unavoidable impacts to the environment. Over : $3.3 billion is spent...

  2. The impact of earthquakes on the city of Aigio in Greece. Urban planning as a factor in mitigating seismic damage.

    NASA Astrophysics Data System (ADS)

    Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos

    2008-07-01

    This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.

  3. Radon control activities for lung cancer prevention in national comprehensive cancer control program plans, 2005-2011.

    PubMed

    Neri, Antonio; Stewart, Sherri L; Angell, William

    2013-08-08

    Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.

  4. L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-30

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

  5. Working with Consortia - Advanced Packaging Reliability

    NASA Technical Reports Server (NTRS)

    Blanche, Jim; Strickland, Mark

    2010-01-01

    Description: Support the responsible NASA official for lead-free solder evaluation. Serve as the NASA technical liaison to the NASA/DoD Pb-free Project. Assure NASA areas of interest are included in JG-PP follow-on work. Support NASA/DoD telcons and face-to-face meetings. Update MSFC lead-free solder lessons learned report. FY10 plans: - Reliability data on lead-free solder applications for various part lead finishes and board finishes. - Update lead-free solder risks and risk mitigation strategies for NASA. - Evaluate lead-free alloy/lead-free finish reliability in design application. - Status CAVE project on Pb-free solder aging effects. - Compile the LTESE flight and bench data.

  6. Use of Artificial Burrows by Burrowing Owls (Athene cunicularia) at the HAMMER Facility on the U.S. Department of Energy Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.

    In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less

  7. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildings, infrastructure, and critical facilities located in the identified hazard areas; (B) An estimate... particular emphasis on new and existing buildings and infrastructure. (iii) An action plan describing how the...

  8. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study

    NASA Astrophysics Data System (ADS)

    Bowen, S. R.; Nyflot, M. J.; Herrmann, C.; Groh, C. M.; Meyer, J.; Wollenweber, S. D.; Stearns, C. W.; Kinahan, P. E.; Sandison, G. A.

    2015-05-01

    Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.

  9. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study.

    PubMed

    Bowen, S R; Nyflot, M J; Herrmann, C; Groh, C M; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A

    2015-05-07

    Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [(18)F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.

  10. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study

    PubMed Central

    Bowen, S R; Nyflot, M J; Hermann, C; Groh, C; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A

    2015-01-01

    Effective positron emission tomography/computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by 6 different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy (VMAT) were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses (EUD), and 2%-2mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10–20%, treatment planning errors were 5–10%, and treatment delivery errors were 5–30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5–10% in PET/CT imaging, < 5% in treatment planning, and < 2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery. PMID:25884892

  11. How much do hazard mitigation plans cost? An analysis of federal grant data.

    PubMed

    Jackman, Andrea M; Beruvides, Mario G

    2013-01-01

    Under the Disaster Mitigation Act of 2000 and Federal Emergency Management Agency's subsequent Interim Final Rule, the requirement was placed on local governments to author and gain approval for a Hazard Mitigation Plan (HMP) for the areas under their jurisdiction. Low completion percentages for HMPs--less than one-third of eligible governments--were found by an analysis conducted 3 years after the final deadline for the aforementioned legislation took place. Follow-up studies showed little improvement at 5 and 8 years after the deadline. It was hypothesized that the cost of a HMP is a significant factor in determining whether or not a plan is completed. A study was conducted using Boolean Matrix Analysis methods to determine what, if any, characteristics of a certain community will most influence the cost of a HMP. The frequency of natural hazards experienced by the planning area, the number of jurisdictions participating in the HMEP, the population, and population density were found to significantly affect cost. These variables were used in a regression analysis to determine their predictive power for cost. It was found that along with two interaction terms, the variables explain approximately half the variation in HMP cost.

  12. Urban Policies and Earthquake Risk Mitigation

    NASA Astrophysics Data System (ADS)

    Sarlo, Antonella

    2008-07-01

    The paper aims at proposing some considerations about some recent experiences of research carried out on the theme of earthquake risk mitigation and combining policies and actions of mitigation with urban development strategies. The objective was to go beyond the classical methodological approach aiming at defining a "technical" evaluation of the earthquake risk through a procedure which can correlate the three "components" of danger, exposure and vulnerability. These researches experiment, in terms of methodology and application, with a new category of interpretation and strategy: the so-called Struttura Urbana Minima (Minimum urban structure). Actually, the introduction of the Struttura Urbana Minima establishes a different approach towards the theme of safety in the field of earthquake risk, since it leads to a wider viewpoint, combining the building aspect of the issue with the purely urban one, involving not only town planning, but also social and managerial implications. In this sense the constituent logic of these researches is strengthened by two fundamental issues: - The social awareness of earthquake; - The inclusion of mitigation policies in the ordinary strategies for town and territory management. Three main aspects of the first point, that is of the "social awareness of earthquake", characterize this issue and demand to be considered within a prevention policy: - The central role of the risk as a social production, - The central role of the local community consent, - The central role of the local community capability to plan Therefore, consent, considered not only as acceptance, but above all as participation in the elaboration and implementation of choices, plays a crucial role in the wider issue of prevention policies. As far as the second point is concerned, the inclusion of preventive mitigation policies in ordinary strategies for the town and territory management demands the identification of criteria of choice and priorities of intervention and, as a consequence, the opportunity to promote an approach to the theme of mitigation policies realized through strategic principles and systemic logics able to shift the problem from the building to the town. The critical aspects of this theme are tied to three main issues: - The sharing of the way of interpreting town planning, - The integration of multiple objectives in one intervention tool, - The measures which can be adopted for an effective prevention policy. The above-mentioned elements have inspired these researches experimented on Calabrian towns. In particular, in this paper the experience carried out on Reggio Calabria is proposed. Its cultural roots derive from the principles and criteria experimented in small Calabrian towns, but it modifies them according to the complexity of the urban settlement, introducing also some experimental concepts and methodological approaches.

  13. Lower Clearwater Aquatic Mammal Survey. Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mack, Curt; Kronemann, Loren A.; Eneas, Cheryl

    BPA provided funding to collect baseline data on river otters to assist in developing mitigation implementation plans for river otters percent to the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, sections 1003 (b)(2) and (3). Distribution, movements, habitat use, and diets of river otters were investigated in the Clearwater River within the Nez Perce Indian Reservation from 1991-1992. The study outlined recommendations to guide development of mitigation implementation plans for riparian habitats. Sections of the Clearwater River were identified that if protected or enhanced would provide optimal benefit to otters. Habitat improvement alternatives were also outlinedmore » which could be used to enhance otter habitats.« less

  14. Mitigating Nitrogen Deposition Impacts on Biodiversity in California: Generating Funding for Weed Management

    NASA Astrophysics Data System (ADS)

    Weiss, S. B.

    2013-12-01

    The impacts of atmospheric nitrogen deposition on biodiversity are widespread and profound; N-inputs have far exceeded any historical range of variability and are altering ecosystem structure and function worldwide. Overwhelming scientific evidence documents acute threats to numerous California ecosystems and imperiled species through increased growth of invasive annual grasses and forbs, yet policy responses lag far behind the science. Since 2001, a confluence of several projects (gas-fired powerplants and highway improvements) in Santa Clara County set powerful precedents for mitigation of N-deposition impacts on ecosystems via the Endangered Species Act, with a focus on the Bay checkerspot butterfly. These projects have culminated in the Santa Clara Valley Habitat Plan, a 50-year $665,000,000 mitigation plan to conserve and manage habitat for 19 target species. Elsewhere, powerplants in San Diego and Contra Costa Counties have provided mitigation funds for habitat restoration and weed management. Building on these precedents, the California Invasive Plant Council, California Native Plant Society, and other groups are forming a coalition to extend this mitigation across California to generate money for weed management. Key elements of this incipient campaign include: 1) education of regulatory agencies, activists, and decision-makers about the threat; 2) generation of standard EIR comments with project specifics for developments that increase traffic or generate nitrogen emissions; 3) encouraging state and federal wildlife agencies to raise the issue in consultations and Habitat Conservation Plans; 4) policy and legal research to chart a course through the regulatory and political landscape; 5) collating research on impacts and development of tools to document those impacts; 6) media outreach, and 7) coalition building. The main mitigation strategy is funding for local weed management and stewardship groups through fees. There is a desperate need for stable long-term funding of weed management on parks, preserves and other wildlands, and mitigating N-deposition could provide one major source.

  15. Buildings: Mitigation Opportunities with a Focus on Health Implications

    EPA Science Inventory

    For Frank Princiotta’s book, Global Climate Change—The Technology Challenge Addressing building energy use is the critical first step in any strategic plan for mitigating climate change. Buildings have a direct impact on estimated global climate change due to their large carbon ...

  16. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  17. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  18. Designing climate change mitigation plans that add up.

    PubMed

    Bajželj, Bojana; Allwood, Julian M; Cullen, Jonathan M

    2013-07-16

    Mitigation plans to combat climate change depend on the combined implementation of many abatement options, but the options interact. Published anthropogenic emissions inventories are disaggregated by gas, sector, country, or final energy form. This allows the assessment of novel energy supply options, but is insufficient for understanding how options for efficiency and demand reduction interact. A consistent framework for understanding the drivers of emissions is therefore developed, with a set of seven complete inventories reflecting all technical options for mitigation connected through lossless allocation matrices. The required data set is compiled and calculated from a wide range of industry, government, and academic reports. The framework is used to create a global Sankey diagram to relate human demand for services to anthropogenic emissions. The application of this framework is demonstrated through a prediction of per-capita emissions based on service demand in different countries, and through an example showing how the "technical potentials" of a set of separate mitigation options should be combined.

  19. Evaluating Temporal Factors in Combined Interventions of Workforce Shift and School Closure for Mitigating the Spread of Influenza

    PubMed Central

    Zhang, Tianyou; Fu, Xiuju; Ma, Stefan; Xiao, Gaoxi; Wong, Limsoon; Kwoh, Chee Keong; Lees, Michael; Lee, Gary Kee Khoon; Hung, Terence

    2012-01-01

    Background It is believed that combined interventions may be more effective than individual interventions in mitigating epidemic. However there is a lack of quantitative studies on performance of the combination of individual interventions under different temporal settings. Methodology/Principal Findings To better understand the problem, we develop an individual-based simulation model running on top of contact networks based on real-life contact data in Singapore. We model and evaluate the spread of influenza epidemic with intervention strategies of workforce shift and its combination with school closure, and examine the impacts of temporal factors, namely the trigger threshold and the duration of an intervention. By comparing simulation results for intervention scenarios with different temporal factors, we find that combined interventions do not always outperform individual interventions and are more effective only when the duration is longer than 6 weeks or school closure is triggered at the 5% threshold; combined interventions may be more effective if school closure starts first when the duration is less than 4 weeks or workforce shift starts first when the duration is longer than 4 weeks. Conclusions/Significance We therefore conclude that identifying the appropriate timing configuration is crucial for achieving optimal or near optimal performance in mitigating the spread of influenza epidemic. The results of this study are useful to policy makers in deliberating and planning individual and combined interventions. PMID:22403634

  20. Pandemic Influenza Preparedness and Response Among Public-Housing Residents, Single-Parent Families, and Low-Income Populations

    PubMed Central

    Truman, Benedict I.; Hutchins, Sonja; Richard, Roland; Brown, Clive; Guillory, Joyce A.; Rashid, Jamila

    2009-01-01

    During the early stages of an influenza pandemic, a pandemic vaccine likely will not be available. Therefore, interventions to mitigate pandemic influenza transmission in communities will be an important component of the response to a pandemic. Public-housing residents, single-parent families, and low-income populations may have difficulty complying with community-wide interventions. To enable compliance with community interventions, stakeholders recommended the following: (1) community mobilization and partnerships, (2) culturally specific emergency communications planning, (3) culturally specific education and training programs, (4) evidence-based measurement and evaluation efforts, (5) strategic planning policies, (6) inclusion of community members as partners, and (7) policy and program changes to minimize morbidity and mortality. PMID:19797740

  1. Crew Communication as a Factor in Aviation Accidents

    NASA Technical Reports Server (NTRS)

    Goguen, J.; Linde, C.; Murphy, M.

    1986-01-01

    The crew communication process is analyzed. Planning and explanation are shown to be well-structured discourse types, described by formal rules. These formal rules are integrated with those describing the other most important discourse type within the cockpit: the command-and-control speech act chain. The latter is described as a sequence of speech acts for making requests (including orders and suggestions), for making reports, for supporting or challenging statements, and for acknowledging previous speech acts. Mitigation level, a linguistic indication of indirectness and tentativeness in speech, was an important variable in several hypotheses, i.e., the speech of subordinates is more mitigated than the speech of superiors, the speech of all crewmembers is less mitigated when they know that they are in either a problem or emergency situation, and mitigation is a factor in failures of crewmembers to initiate discussion of new topics or have suggestions ratified by the captain. Test results also show that planning and explanation are more frequently performed by captains, are done more during crew- recognized problems, and are done less during crew-recognized emergencies. The test results also indicated that planning and explanation are more frequently performed by captains than by other crewmembers, are done more during crew-recognized problems, and are done less during-recognized emergencies.

  2. Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation

    PubMed Central

    Kennedy, Christina M.; Miteva, Daniela A.; Baumgarten, Leandro; Hawthorne, Peter L.; Sochi, Kei; Polasky, Stephen; Oakleaf, James R.; Uhlhorn, Elizabeth M.; Kiesecker, Joseph

    2016-01-01

    Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development. PMID:27419225

  3. 50 CFR 216.275 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...

  4. Public Participation, Education, and Engagement in Drought Planning

    NASA Astrophysics Data System (ADS)

    Bathke, D. J.; Wall, N.; Haigh, T.; Smith, K. H.; Bernadt, T.

    2014-12-01

    Drought is a complex problem that typically goes beyond the capacity, resources, and jurisdiction of any single person, program, organization, political boundary, or sector. Thus, by nature, monitoring, planning for, and reducing drought risk must be a collaborative process. The National Drought Mitigation Center, in partnership with the National Integrated Drought Information System (NIDIS) Program Office and others, provides active engagement and education drought professionals, stakeholders, and the general public about managing drought-related risks through resilience planning, monitoring, and education. Using case studies, we discuss recruitment processes, network building, participation techniques, and educational methods as they pertain to a variety of unique audiences with distinct objectives. Examples include collaborative decision-making at a World Meteorological Organization conference; planning, and peer-learning among drought professionals in a community of practice; drought condition monitoring through citizen science networks; research and education dissemination with stakeholder groups; and informal learning activities for all ages. Finally, we conclude with evaluation methods, indicators of success, and lessons learned for increasing the effectiveness of our programs in increasing drought resilience.

  5. Safe teleradiology: information assurance as project planning methodology.

    PubMed

    Collmann, Jeff; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2005-01-01

    The Georgetown University Medical Center Department of Radiology used a tailored version of OCTAVE, a self-directed information security risk assessment method, to design a teleradiology system that complied with the regulation implementing the security provisions of the Health Insurance Portability and Accountability Act (HIPAA) of 1996. The system addressed threats to and vulnerabilities in the privacy and security of protected health information. By using OCTAVE, Georgetown identified the teleradiology program's critical assets, described threats to the assurance of those assets, developed and ran vulnerability scans of a system pilot, evaluated the consequences of security breaches, and developed a risk management plan to mitigate threats to program assets, thereby implementing good information assurance practices. This case study illustrates the basic point that prospective, comprehensive planning to protect the privacy and security of an information system strategically benefits program management as well as system security.

  6. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projectsmore » (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.« less

  7. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  8. Evaluating How to Alter Design Processes to Consider Sustainable Practices

    NASA Astrophysics Data System (ADS)

    Liew, V.

    2017-12-01

    The Design Cycle is a well established design methodology featuring four major criterion (Investigating, Planning, Creating, and Evaluating), adopted by International Baccalaureate education foundation. However, as sustainability has become an alarmingly relevant issue, the Design Cycle is not a sufficient guide in its current form. With the the excessive quantities of waste entering Hong Kong's landfills as well as the worldwide issue of rapidly depleting resources, it is imperative that products reduce waste via adaptive or mitigative methods, and that an environmental sector be integrated into the existing Design Cycle. In this piece of research, sustainable design practices will be evaluated to form a list of specifications that products can be assessed against to reduce waste and repurpose materials.

  9. New Activities of the U.S. National Tsunami Hazard Mitigation Program, Mapping and Modeling Subcommittee

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Eble, M. C.

    2013-12-01

    The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is comprised of representatives from coastal states and federal agencies who, under the guidance of NOAA, work together to develop protocols and products to help communities prepare for and mitigate tsunami hazards. Within the NTHMP are several subcommittees responsible for complimentary aspects of tsunami assessment, mitigation, education, warning, and response. The Mapping and Modeling Subcommittee (MMS) is comprised of state and federal scientists who specialize in tsunami source characterization, numerical tsunami modeling, inundation map production, and warning forecasting. Until September 2012, much of the work of the MMS was authorized through the Tsunami Warning and Education Act, an Act that has since expired but the spirit of which is being adhered to in parallel with reauthorization efforts. Over the past several years, the MMS has developed guidance and best practices for states and territories to produce accurate and consistent tsunami inundation maps for community level evacuation planning, and has conducted benchmarking of numerical inundation models. Recent tsunami events have highlighted the need for other types of tsunami hazard analyses and products for improving evacuation planning, vertical evacuation, maritime planning, land-use planning, building construction, and warning forecasts. As the program responsible for producing accurate and consistent tsunami products nationally, the NTHMP-MMS is initiating a multi-year plan to accomplish the following: 1) Create and build on existing demonstration projects that explore new tsunami hazard analysis techniques and products, such as maps identifying areas of strong currents and potential damage within harbors as well as probabilistic tsunami hazard analysis for land-use planning. 2) Develop benchmarks for validating new numerical modeling techniques related to current velocities and landslide sources. 3) Generate guidance and protocols for the production and use of new tsunami hazard analysis products. 4) Identify multistate collaborations and funding partners interested in these new products. Application of these new products will improve the overall safety and resilience of coastal communities exposed to tsunami hazards.

  10. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...

  11. Planning for Flood Recovery and Long-Term Resilience in Vermont

    EPA Pesticide Factsheets

    Vermont requested technical assistance from EPA and FEMA that focused on incorporating smart growth principles into state policies, local development regulations, and Hazard Mitigation Plans to increase community flood resilience.

  12. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reduce risks from natural hazards and serves as a guide for State decision makers as they commit resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... risk assessments must characterize and analyze natural hazards and risks to provide a statewide...

  13. 50 CFR 216.175 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...

  14. An Integrated Career Coaching and Time-Banking System Promoting Flexibility, Wellness, and Success: A Pilot Program at Stanford University School of Medicine.

    PubMed

    Fassiotto, Magali; Simard, Caroline; Sandborg, Christy; Valantine, Hannah; Raymond, Jennifer

    2018-06-01

    Faculty in academic medicine experience multiple demands on their time at work and home, which can become a source of stress and dissatisfaction, compromising success. A taskforce convened to diagnose the state of work-life flexibility at Stanford University School of Medicine uncovered two major sources of conflict: work-life conflict, caused by juggling demands of career and home; and work-work conflict, caused by competing priorities of the research, teaching, and clinical missions combined with service and administrative tasks. Using human-centered design research principles, the 2013-2014 Academic Biomedical Career Customization (ABCC) pilot program incorporated two elements to mitigate work-life and work-work conflict: integrated career-life planning, coaching to create a customized plan to meet both career and life goals; and a time-banking system, recognizing behaviors that promote team success with benefits that mitigate work-life and work-work conflicts. A matched-sample pre-post evaluation survey found the two-part program increased perceptions of a culture of flexibility (P = .020), wellness (P = .013), understanding of professional development opportunities (P = .036), and institutional satisfaction (P = .020) among participants. In addition, analysis of research productivity indicated that over the two-year program, ABCC participants received 1.3 more awards, on average, compared with a matched set of nonparticipants, a funding difference of approximately $1.1 million per person. These results suggest it is possible to mitigate the effects of extreme time pressure on academic medicine faculty, even within existing institutional structures.

  15. Caregiver and Health Care Provider Perspectives on Cloud-Based Shared Care Plans for Children With Medical Complexity.

    PubMed

    Desai, Arti D; Jacob-Files, Elizabeth A; Wignall, Julia; Wang, Grace; Pratt, Wanda; Mangione-Smith, Rita; Britto, Maria T

    2018-06-05

    Shared care plans play an essential role in coordinating care across health care providers and settings for children with medical complexity (CMC). However, existing care plans often lack shared ownership, are out-of-date, and lack universal accessibility. In this study, we aimed to establish requirements for shared care plans to meet the information needs of caregivers and providers and to mitigate current information barriers when caring for CMC. We followed a user-centered design methodology and conducted in-depth semistructured interviews with caregivers and providers of CMC who receive care at a tertiary care children's hospital. We applied inductive, thematic analysis to identify salient themes. Analysis occurred concurrently with data collection; therefore, the interview guide was iteratively revised as new questions and themes emerged. Interviews were conducted with 17 caregivers and 22 providers. On the basis of participant perspectives, we identified 4 requirements for shared care plans that would help meet information needs and mitigate current information barriers when caring for CMC. These requirements included the following: (1) supporting the accessibility of care plans from multiple locations (eg, cloud-based) and from multiple devices, with alert and search features; (2) ensuring the organization is tailored to the specific user; (3) including collaborative functionality such as real-time, multiuser content management and secure messaging; and (4) storing care plans on a secure platform with caregiver-controlled permission settings. Although further studies are needed to understand the optimal design and implementation strategies, shared care plans that meet these specified requirements could mitigate perceived information barriers and improve care for CMC. Copyright © 2018 by the American Academy of Pediatrics.

  16. 32 CFR 211.9 - Mitigation Options.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Mitigation Options. 211.9 Section 211.9 National... MISSION COMPATIBILITY EVALUATION PROCESS Project Evaluation Procedures § 211.9 Mitigation Options. (a) In discussing mitigation to avoid an unacceptable risk to the national security of the United States, the DoD...

  17. 32 CFR 211.9 - Mitigation options.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Mitigation options. 211.9 Section 211.9 National... MISSION COMPATIBILITY EVALUATION PROCESS Project Evaluation Procedures § 211.9 Mitigation options. (a) In discussing mitigation to avoid an unacceptable risk to the national security of the United States, the DoD...

  18. 32 CFR 211.9 - Mitigation Options.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Mitigation Options. 211.9 Section 211.9 National... MISSION COMPATIBILITY EVALUATION PROCESS Project Evaluation Procedures § 211.9 Mitigation Options. (a) In discussing mitigation to avoid an unacceptable risk to the national security of the United States, the DoD...

  19. Quantifying Terrestrial Ecosystem Carbon Stocks for Future GHG Mitigation, Sustainable Land-Use Planning and Adaptation to Climate Change in Quebec, Canada.

    NASA Astrophysics Data System (ADS)

    Garneau, M.; van Bellen, S.

    2016-12-01

    Based on various databases, carbon stocks of terrestrial ecosystems in the boreal and arctic biomes of Quebec were quantified as part of an evaluation of their capacity to mitigate anthropogenic greenhouse gas (GHG) emissions and estimate their vulnerability with respect to recent climate change and land use changes. The results of this project are contributing to the establishment of the Strategy for Climate Change Adaptation as well as the 2013-2020 Climate Change Action Plan of the Quebec Ministry of Environment, which aim to adapt the Quebec society to the effects of climate change and the reduction of GHG emissions. The total carbon stock of the soils of the forest and peatland ecosystems of Quebec was quantified at 18.00 Gt C or 66.0 Gt CO2-equivalent, of which 95% corresponds to the boreal and arctic regions. The mean carbon mass per unit area (kg C m-2) of peatlands is about nine times higher than that of forests, with values of 100,0 kg C m-2 for peatlands and 10,9 kg C m-2 for forest stands. In 2013, total anthropogenic emissions in Quebec were quantified at 82.6 Mt CO2-equivalent (Environment Canada, 2015), or 1.25‰ of the total Quebec ecosystem carbon stock. The total stock thus represents the equivalent of about 800 years of anthropogenic emissions at the current rate, divided between 478 years for peatlands and 321 years for forest soils. Future GHG mitigation policies and sustainable land-use planning should be supported by scientific data on terrestrial ecosystems carbon stocks. An increase in investments in peatland, wetland and forest conservation, management and rehabilitation may contribute to limit greenhouse gas emissions. It is therefore essential, that, following the objectives of multiple international organisations, the management of terrestrial carbon stocks becomes part of the national engagement to reduce GHG emissions.

  20. Results of the UCAR 2008 Forum on Climate Mitigation and Adaptation

    NASA Astrophysics Data System (ADS)

    Fellows, J.; Barron, E.

    2008-12-01

    Mayors, governors, and local decision makers are developing climate change action plans. They are not waiting for the federal carbon emission reduction debates to conclude (e.g., cap and trade or carbon tax legislation). Many of them are struggling with what should be in these plans, what they should be assuming about future weather and climate trends, and what the impact might be on their community and its infrastructure. In October 2008, the University Corporation for Atmospheric Research held a forum at its 2008 Members' Meeting that focused on the UCAR community's role in climate change adaptation and mitigation. Many of UCAR's 71 university members are involved in projects with local and regional decision makers struggling with planning for the future in the face of climate change. The forum focused on the following questions: 1. How are these projects working and what lessons have we learned? 2. What can our community can do to assist these partnerships (e.g., models and other tools, better information, training opportunities, outreach, sharing ideas, etc.)? 3. Can we help our nation deal more effectively with climate mitigation and adaptation by being more strategic with these partnerships (e.g., more coordination, creating packages of tools and information, creating common approaches to climate action plans, developing better communication tools, community strategic planning effort, etc.)? This presentation will provide a summary of the forum outcomes.

  1. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  2. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  3. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  4. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  5. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  6. Vegetation and other development options for mitigating urban air pollution impacts

    Treesearch

    Richard Baldauf; David J. Nowak

    2014-01-01

    While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.

  7. 30 CFR 250.254 - What mitigation measures information must accompany the DPP or DOCD?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the DPP or DOCD? 250.254 Section 250.254 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT... Information Contents of Development and Production Plans (dpp) and Development Operations Coordination...

  8. REVIEW OF SELECTED STATE-OF-THE-ART APPLICATIONS OF DIAGNOSTIC MEASUREMENTS FOR RADON MITIGATION PLANNING

    EPA Science Inventory

    Since late-1984, EPA's AEERL has supported a program to develop and demonstrate radon mitigation techniques for single-family detached dwellings. As part of the program, projects have been started directed at developing and demonstrating the use of diagnostic measurements in all ...

  9. Extending the life of asphalt pavements : part II Implementation plan: mitigation strategies & demonstration/pilot projects products P1 and P3.

    DOT National Transportation Integrated Search

    2011-01-01

    This report presents the mitigation strategies and demonstration/pilot projects that are recommended to enhance performance and reduce the occurrence of pavements exhibiting accelerated aging or deterioration. The report is grouped into two parts, fo...

  10. Impact of urbanization-related land use land cover changes and urban morphology changes on the urban heat island phenomenon.

    PubMed

    Zhou, Xuefan; Chen, Hong

    2018-04-24

    Urban growth and development caused by urbanization influence the urban heat island (UHI) phenomenon. With the rapid development of urbanization, China's major cities are facing more serious climate change problems, especially the UHI phenomenon. Proper planning and urban design of compact cities may improve the ventilation of street canyons and change the heat balance in the urban canopy and thus mitigate the UHI phenomenon. The aim of this study is to evaluate and discuss the mitigation of UHI with different types of land-use and land-cover (LUCC), as well as different development patterns for compact cities. To this end, we applied the weather research and forecasting model (WRF) with urban canopy model (WRF/UCM) in this study. To evaluate the impact of LUCC changes on the UHI, we set 2 cases based on land use and land cover statistical data from 1965 and 2008 of Wuhan. Also, to evaluate the impact of urban morphology changes on the UHI, we designed 2 hypothetical cases based on 2 different urban developing patterns, one is high rise case and another is high density case, to simulate the impact of urban morphology on the UHI. As for the results of this study, with different LUCC of 1965 and 2008, UHI intensity of Wuhan increased by 0.2 °C-0.4 °C in average. Moreover, the critical wind speed which can mitigate UHI of case 1965 is much lower than case 2008. With different urban morphology, the high-rise case may lead to lower UHI intensity at the pedestrian level due to the shading effects of high-rise buildings. However, the critical value of wind speed in the high-rise case was almost 1.5-2 times greater than that of the high-density case, which illustrates the reduced possibility of mitigating the UHI phenomenon for high-rise buildings in Wuhan City. Copyright © 2018 Elsevier B.V. All rights reserved.

  11. Prediction of future urban growth using CA-Markov for urban sustainability planning of Banda Aceh, Indonesia

    NASA Astrophysics Data System (ADS)

    Achmad, A.; Irwansyah, M.; Ramli, I.

    2018-03-01

    Banda Aceh experienced rapid growth, both physically, socially, and economically, after the Tsunami that devastated it the end of December in 2004. Hence policy controls are needed to direct the pattern of urban growth to achieve sustainable development for the future. The purpose of this paper is to generate a growth model for Banda Aceh using the CA-Markov process. By knowing the changes in land use between 2005 and 2009 from the results of previous research, simulations for 2013, 2019 and 2029 using the application of Idrisi@Selva. CA-Markov models were prepared to determine the quantity of changes. The simulation results showed that, after the Tsunami, the City of Banda Aceh tended to grow towards the coast. For the control of the LUC, the Banda Aceh City government needs to prepare comprehensive and detailed maps and inventory of LUC for the city to provide basic data and information needed for monitoring and evaluation that can be done effectively and efficiently. An institution for monitoring and evaluation of the urban landscape and the LUC should be formed immediately. This institution could consist of representatives from government, academia, community leaders, the private sector and other experts. The findings from this study can be used to start the monitoring and evaluation of future urban growth. Especially for the coastal areas, the local government should immediately prepare special spatial coastal area plans to control growth in those areas and to ensure that the economic benefits from disaster mitigation and coastal protection are preserved. For the development of the city in the future, it is necessary to achieve a balance between economic development, and social welfare with environmental protection and disaster mitigation. iIt will become a big challenge to achieve sustainable development for the future.

  12. Application of failure mode and effects analysis to treatment planning in scanned proton beam radiotherapy

    PubMed Central

    2013-01-01

    Background A multidisciplinary and multi-institutional working group applied the Failure Mode and Effects Analysis (FMEA) approach to the actively scanned proton beam radiotherapy process implemented at CNAO (Centro Nazionale di Adroterapia Oncologica), aiming at preventing accidental exposures to the patient. Methods FMEA was applied to the treatment planning stage and consisted of three steps: i) identification of the involved sub-processes; ii) identification and ranking of the potential failure modes, together with their causes and effects, using the risk probability number (RPN) scoring system, iii) identification of additional safety measures to be proposed for process quality and safety improvement. RPN upper threshold for little concern of risk was set at 125. Results Thirty-four sub-processes were identified, twenty-two of them were judged to be potentially prone to one or more failure modes. A total of forty-four failure modes were recognized, 52% of them characterized by an RPN score equal to 80 or higher. The threshold of 125 for RPN was exceeded in five cases only. The most critical sub-process appeared related to the delineation and correction of artefacts in planning CT data. Failures associated to that sub-process were inaccurate delineation of the artefacts and incorrect proton stopping power assignment to body regions. Other significant failure modes consisted of an outdated representation of the patient anatomy, an improper selection of beam direction and of the physical beam model or dose calculation grid. The main effects of these failures were represented by wrong dose distribution (i.e. deviating from the planned one) delivered to the patient. Additional strategies for risk mitigation, easily and immediately applicable, consisted of a systematic information collection about any known implanted prosthesis directly from each patient and enforcing a short interval time between CT scan and treatment start. Moreover, (i) the investigation of dedicated CT image reconstruction algorithms, (ii) further evaluation of treatment plan robustness and (iii) implementation of independent methods for dose calculation (such as Monte Carlo simulations) may represent novel solutions to increase patient safety. Conclusions FMEA is a useful tool for prospective evaluation of patient safety in proton beam radiotherapy. The application of this method to the treatment planning stage lead to identify strategies for risk mitigation in addition to the safety measures already adopted in clinical practice. PMID:23705626

  13. Hydropower impacts on reservoir fish populations are modified by environmental variation.

    PubMed

    Eloranta, Antti P; Finstad, Anders G; Helland, Ingeborg P; Ugedal, Ola; Power, Michael

    2018-03-15

    Global transition towards renewable energy production has increased the demand for new and more flexible hydropower operations. Before management and stakeholders can make informed choices on potential mitigations, it is essential to understand how the hydropower reservoir ecosystems respond to water level regulation (WLR) impacts that are likely modified by the reservoirs' abiotic and biotic characteristics. Yet, most reservoir studies have been case-specific, which hampers large-scale planning, evaluation and mitigation actions across various reservoir ecosystems. Here, we investigated how the effect of the magnitude, frequency and duration of WLR on fish populations varies along environmental gradients. We used biomass, density, size, condition and maturation of brown trout (Salmo trutta L.) in Norwegian hydropower reservoirs as a measure of ecosystem response, and tested for interacting effects of WLR and lake morphometry, climatic conditions and fish community structure. Our results showed that environmental drivers modified the responses of brown trout populations to different WLR patterns. Specifically, brown trout biomass and density increased with WLR magnitude particularly in large and complex-shaped reservoirs, but the positive relationships were only evident in reservoirs with no other fish species. Moreover, increasing WLR frequency was associated with increased brown trout density but decreased condition of individuals within the populations. WLR duration had no significant impacts on brown trout, and the mean weight and maturation length of brown trout showed no significant response to any WLR metrics. Our study demonstrates that local environmental characteristics and the biotic community strongly modify the hydropower-induced WLR impacts on reservoir fishes and ecosystems, and that there are no one-size-fits-all solutions to mitigate environmental impacts. This knowledge is vital for sustainable planning, management and mitigation of hydropower operations that need to meet the increasing worldwide demand for both renewable energy and ecosystem services delivered by freshwaters. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  15. Crisis Planning: Survey Results from Hurricane Katrina and Implications for Performance Improvement Professionals

    ERIC Educational Resources Information Center

    Hutchins, Holly M.; Annulis, Heather; Gaudet, Cyndi

    2008-01-01

    Modern organizations constantly face unparalleled changes and uncertainty in the competitive world, thus requiring strategic planning to mitigate crisis conditions. Underscoring crisis plans are performance interventions that prepare employees, technological systems, and the organizational culture to effectively respond to a crisis event. However,…

  16. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  17. DOD Product Support Business Case Analysis Guidebook

    DTIC Science & Technology

    2011-04-01

    Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan

  18. Iowa Climate Change Adaptation and Resilience Report

    EPA Pesticide Factsheets

    The findings of a pilot project to work with stakeholders and governments in Iowa to identify barriers to and incentives for considering regional effects of climate change in hazard mitigation planning and other community planning processes.

  19. Stability, structure and scale: improvements in multi-modal vessel extraction for SEEG trajectory planning.

    PubMed

    Zuluaga, Maria A; Rodionov, Roman; Nowell, Mark; Achhala, Sufyan; Zombori, Gergely; Mendelson, Alex F; Cardoso, M Jorge; Miserocchi, Anna; McEvoy, Andrew W; Duncan, John S; Ourselin, Sébastien

    2015-08-01

    Brain vessels are among the most critical landmarks that need to be assessed for mitigating surgical risks in stereo-electroencephalography (SEEG) implantation. Intracranial haemorrhage is the most common complication associated with implantation, carrying significantly associated morbidity. SEEG planning is done pre-operatively to identify avascular trajectories for the electrodes. In current practice, neurosurgeons have no assistance in the planning of electrode trajectories. There is great interest in developing computer-assisted planning systems that can optimise the safety profile of electrode trajectories, maximising the distance to critical structures. This paper presents a method that integrates the concepts of scale, neighbourhood structure and feature stability with the aim of improving robustness and accuracy of vessel extraction within a SEEG planning system. The developed method accounts for scale and vicinity of a voxel by formulating the problem within a multi-scale tensor voting framework. Feature stability is achieved through a similarity measure that evaluates the multi-modal consistency in vesselness responses. The proposed measurement allows the combination of multiple images modalities into a single image that is used within the planning system to visualise critical vessels. Twelve paired data sets from two image modalities available within the planning system were used for evaluation. The mean Dice similarity coefficient was 0.89 ± 0.04, representing a statistically significantly improvement when compared to a semi-automated single human rater, single-modality segmentation protocol used in clinical practice (0.80 ± 0.03). Multi-modal vessel extraction is superior to semi-automated single-modality segmentation, indicating the possibility of safer SEEG planning, with reduced patient morbidity.

  20. Radon Control Activities for Lung Cancer Prevention in National Comprehensive Cancer Control Program Plans, 2005–2011

    PubMed Central

    Stewart, Sherri L.; Angell, William

    2013-01-01

    Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457

  1. SU-E-T-217: Comprehensive Dosimetric Evaluation On 3D-CRT, IMRT and Non-Coplanar Arc Treatment for Prone Accelerated Partial Breast Irradiation (APBI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chiu, T; Yan, Y; Ramirez, E

    2015-06-15

    Purpose: Accelerated partial breast irradiation (APBI) is an effective treatment for early stage breast-cancer. Irradiation in a prone position can mitigate breast motion and spare heart and lung. In this study, a comprehensive study is performed to evaluate various treatment techniques for prone APBI treatment including: 3D-CRT, IMRT, co-planar and non-coplanar partial arcs treatment. Methods: In this treatment planning study, a left breast patient treated in prone position in our clinic was imported into Varian Eclipse TPS. Six beams tangential to chest wall were used in both 3D-CRT and IMRT plans. These six beams were coplanar in a transactional planemore » achieved by both gantry and couch rotation. A 60-beam IMRT plan was also created to explore the maximum benefit of co-planar IMRT. Within deliverable couch rotation range (±30°), partial arc treatment plans with one and up to ten couch positions were generated for comparison. For each plan, 30Gy in 6 fractions was prescribed to 95% PTV volume. Critical dosimetric parameters, such as conformity index, mean, maximum, and volume dose of organ at risk, are evaluated. Results: The conformity indexes (CI) are 3.53, 3.17, 2.21 and 1.08 respectively to 3D-CRT, 6-beam IMRT, 60-beam IMRT, and two-partial-arcs coplanar plans. However, arc plans increase heart dose. CI for non-coplanar arc plans decreases from 1.19 to 1.10 when increases couch positions. Maximum dose in ipsilateral lung (1.98 to 1.13 Gy), and heart (0.62 to 0.43 Gy) are steadily decreased with the increased number of non-coplanar arcs. Conclusions: The dosimetric evaluation results show that partial arc plans have improved CIs compared to conventional 3D-CRT and IMRT plans. Increasing number of partial arcs decreases lung and heart dose. The dosimetric benefit obtained from non-coplanar arcs should be considered with treatment delivery time.« less

  2. Inclusion of climate change strategies in municipal Integrated Development Plans: A case from seven municipalities in Limpopo Province, South Africa

    PubMed Central

    2016-01-01

    The Intergovernmental Panel on Climate Change (IPCC) has made it clear that anthropogenic greenhouse gasses are the main cause of observed global warming that leads to climate change. Climate change is now a global reality. In the South African political set-up, local municipalities are the structures that are in direct contact with communities and they draw up Integrated Development Plans (IDPs), which are reviewed and upgraded annually. The article seeks to investigate the extent to which climate change adaptation and mitigation strategies are embedded IDPs in seven vulnerable municipalities in the Limpopo Province. The article conducted an in-depth content analysis of the IDPs of the seven municipalities and the results have revealed that these municipalities have not included adaptation and mitigation strategies adequately in their IDPs despite being the most vulnerable municipalities in the province. The article concludes that these municipalities have not as yet institutionalised climate change in their daily operations, planning and decision making. To this end, the paper recommends that local municipalities should include climate change adaptation and mitigation strategies in their IDPs.

  3. Drainage network optimization for inundation mitigation case study of ITS Surabaya

    NASA Astrophysics Data System (ADS)

    Savitri, Yang Ratri; Lasminto, Umboro

    2017-06-01

    Institut Teknologi Sepuluh Nopember (ITS) Surabaya is one of engineering campus in Surabaya with an area of ± 187 ha, which consists of building and campus facilities. The campus is supported by drainage system planned according to the ITS Master Plan on 2002. The drainage system is planned with numbers of retention and detention pond based on the city concept of Zero Delta Q concept. However, in the rainy season, it frequently has inundation problems in several locations. The problems could be identified from two major sources, namely the internal campus facilities and external condition connected with the city drainage system. This paper described the capabilities of drainage network optimization to mitigate local urban drainage problem. The hydrology-hydraulic investigation was done by utilizing the Storm Water Management Model (SWMM) developed by US Environmental Protection Agency (EPA). The mitigation is based on several alternative that based on the existing condition and regarding the social problem. The study results showed that the management of the flow from external source could reduce final stored volume of the campus main channel by 31.75 %.

  4. LNG risk management

    NASA Astrophysics Data System (ADS)

    Martino, P.

    1980-12-01

    A general methodology is presented for conducting an analysis of the various aspects of the hazards associated with the storage and transportation of liquefied natural gas (LNG) which should be considered during the planning stages of a typical LNG ship terminal. The procedure includes the performance of a hazards and system analysis of the proposed site, a probability analysis of accident scenarios and safety impacts, an analysis of the consequences of credible accidents such as tanker accidents, spills and fires, the assessment of risks and the design and evaluation of risk mitigation measures.

  5. A dynamic vulnerability evaluation model to smart grid for the emergency response

    NASA Astrophysics Data System (ADS)

    Yu, Zhen; Wu, Xiaowei; Fang, Diange

    2018-01-01

    Smart grid shows more significant vulnerability to natural disasters and external destroy. According to the influence characteristics of important facilities suffered from typical kinds of natural disaster and external destroy, this paper built a vulnerability evaluation index system of important facilities in smart grid based on eight typical natural disasters, including three levels of static and dynamic indicators, totally forty indicators. Then a smart grid vulnerability evaluation method was proposed based on the index system, including determining the value range of each index, classifying the evaluation grade standard and giving the evaluation process and integrated index calculation rules. Using the proposed evaluation model, it can identify the most vulnerable parts of smart grid, and then help adopting targeted emergency response measures, developing emergency plans and increasing its capacity of disaster prevention and mitigation, which guarantee its safe and stable operation.

  6. Guided preparedness planning with lay communities: enhancing capacity of rural emergency response through a systems-based partnership.

    PubMed

    McCabe, O Lee; Perry, Charlene; Azur, Melissa; Taylor, Henry G; Gwon, Howard; Mosley, Adrian; Semon, Natalie; Links, Jonathan M

    2013-02-01

    Community disaster preparedness plans, particularly those with content that would mitigate the effects of psychological trauma on vulnerable rural populations, are often nonexistent or underdeveloped. The purpose of the study was to develop and evaluate a model of disaster mental health preparedness planning involving a partnership among three, key stakeholders in the public health system. A one-group, post-test, quasi-experimental design was used to assess outcomes as a function of an intervention designated Guided Preparedness Planning (GPP). The setting was the eastern-, northern-, and mid-shore region of the state of Maryland. Partner participants were four local health departments (LHDs), 100 faith-based organizations (FBOs), and one academic health center (AHC)-the latter, collaborating entities of the Johns Hopkins University and the Johns Hopkins Health System. Individual participants were 178 community residents recruited from counties of the above-referenced geographic area. Effectiveness of GPP was based on post-intervention assessments of trainee knowledge, skills, and attitudes supportive of community disaster mental health planning. Inferences about the practicability (feasibility) of the model were drawn from pre-defined criteria for partner readiness, willingness, and ability to participate in the project. Additional aims of the study were to determine if LHD leaders would be willing and able to generate post-project strategies to perpetuate project-initiated government/faith planning alliances (sustainability), and to develop portable methods and materials to enhance model application and impact in other health jurisdictions (scalability). The majority (95%) of the 178 lay citizens receiving the GPP intervention and submitting complete evaluations reported that planning-supportive objectives had been achieved. Moreover, all criteria for inferring model feasibility, sustainability, and scalability were met. Within the span of a six-month period, LHDs, FBOs, and AHCs can work effectively to plan, implement, and evaluate what appears to be an effective, practical, and durable model of capacity building for public mental health emergency planning.

  7. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less

  8. Disaster planning and mitigation technologies, interim technology inventory report: Report {number_sign}2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oggerino, J.; Rabinowitz, M.

    1998-06-01

    Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. Each year, 10,000 violent thunderstorms, 5,000 floods, and 1,000 tornadoes strike the US. These and other natural events have cost at least $8 billion per year over the last 30 years, and the annual costs are increasing rapidly. In 1996, the US experienced twice the yearly average of declared disasters than in the previous twenty years. Damage from Hurricane Andrew and themore » Northridge earthquake resulted in losses of $30 and $25 billion respectively. As a result of these and other costly disasters, utilities are losing business and commercial customers. In response, federal, state, and local organizations have steeped up efforts to deploy mitigation technologies and techniques and business recovery support. A task within the EPRI Disaster Planning and Mitigation Technologies (DP and MT) Target seeks to identify technologies that can help utilities and their customers prepare for and recover from natural disasters. This report provides concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses.« less

  9. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    EPA Pesticide Factsheets

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  10. National Contingency Plan Subpart J

    EPA Pesticide Factsheets

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  11. Landslides! Engaging students in natural hazards and STEM principles through the exploration of landslide analog models

    NASA Astrophysics Data System (ADS)

    Gochis, E. E.; Lechner, H. N.; Brill, K. A.; Lerner, G.; Ramos, E.

    2014-12-01

    Graduate students at Michigan Technological University developed the "Landslides!" activity to engage middle & high school students participating in summer engineering programs in a hands-on exploration of geologic engineering and STEM (Science, Technology, Engineering and Math) principles. The inquiry-based lesson plan is aligned to Next Generation Science Standards and is appropriate for 6th-12th grade classrooms. During the activity students focus on the factors contributing to landslide development and engineering practices used to mitigate hazards of slope stability hazards. Students begin by comparing different soil types and by developing predictions of how sediment type may contribute to differences in slope stability. Working in groups, students then build tabletop hill-slope models from the various materials in order to engage in evidence-based reasoning and test their predictions by adding groundwater until each group's modeled slope fails. Lastly students elaborate on their understanding of landslides by designing 'engineering solutions' to mitigate the hazards observed in each model. Post-evaluations from students demonstrate that they enjoyed the hands-on nature of the activity and the application of engineering principles to mitigate a modeled natural hazard.

  12. Optimization of protocol design: a path to efficient, lower cost clinical trial execution

    PubMed Central

    Malikova, Marina A

    2016-01-01

    Managing clinical trials requires strategic planning and efficient execution. In order to achieve a timely delivery of important clinical trials’ outcomes, it is useful to establish standardized trial management guidelines and develop robust scoring methodology for evaluation of study protocol complexity. This review will explore the challenges clinical teams face in developing protocols to ensure that the right patients are enrolled and the right data are collected to demonstrate that a drug is safe and efficacious, while managing study costs and study complexity based on proposed comprehensive scoring model. Key factors to consider when developing protocols and techniques to minimize complexity will be discussed. A methodology to identify processes at planning phase, approaches to increase fiscal return and mitigate fiscal compliance risk for clinical trials will be addressed. PMID:28031939

  13. GHG emission mitigation measures and technologies in the Czech Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tichy, M.

    1996-12-31

    The paper presents a short overview of main results in two fields: projection of GHG emission from energy sector in the Czech Republic and assessment of technologies and options for GHG mitigation. The last part presents an overview of measures that were prepared for potential inclusion to the Czech Climate Change Action Plan.

  14. 78 FR 13844 - Change in Submission Requirements for State Mitigation Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... protecting human lives and the environment. No action that FEMA can anticipate under this rule will have a... to reduce damage to lives, property, and the economy from future disasters. State, Tribal, and local... funding for eligible mitigation activities that reduce disaster losses and protect life and property from...

  15. Carbon stocks of mangroves within the Zambezi River Delta, Mozambique

    Treesearch

    Christina E. Stringer; Carl C. Trettin; Stanley J. Zarnoch; Wenwu Tang

    2015-01-01

    Mangroves are well-known for their numerous ecosystem services, including storing a globally significant C pool. There is increasing interest in the inclusion of mangroves in national climate change mitigation and adaptation plans in developing nations as they become involved with incentive programs for climate change mitigation. The quality and precision of data...

  16. Teaching land-use planning in a flood prone area with an educational software

    NASA Astrophysics Data System (ADS)

    Metzger, R.; Jaboyedoff, M.

    2009-04-01

    Teaching of flood risk mapping and mitigation is a necessary task in geosciences studies. However, there is often a gap between the theoretical hydraulic notions broached during the courses and the possibility to make use of them in practice by the students during supervised computer lab exercises. This is mainly due because professional models/software have a steep learning curve and the lecturer spend most of his time to explain how to make such or such operation with the software. To overcome this shortcoming, an educational software was developed, which is made of three main modules: 1) A user-friendly graphical interface (GUI), allowing for handling geographical data and creating thematic maps (Geographical Information System (GIS) module); 2) A flood model (hydrological and inundation models) part allowing for freeing student as much as possible from the repetitive and tedious tasks related to modeling issues, while keeping reasonable computational time; 3) A land use planning module, which allow for specifying mitigation measures (dikes and levees building, flood retention, renaturation, …) and for evaluating their effects by re-running the flood model. The main goal of this educational software is to provide a smooth approach to the modeling issue, without loosing the focus on the main task which is flood risk reduction.

  17. Issues for academic health centers to consider before implementing a balanced-scorecard effort.

    PubMed

    Zelman, W N; Blazer, D; Gower, J M; Bumgarner, P O; Cancilla, L M

    1999-12-01

    Because of changes in the health care environment, it is likely that strategic planning and management will become much more important to academic health centers (AHCs) than in the past. One approach to strategic planning and management that is gaining the considerable interest of health care organizations is the balanced scorecard. Based on a year's experience in examining this management tool, and on early implementation efforts, the authors critically evaluate the applicability of the balanced-scorecard approach at AHCs in relation to two fundamental questions: Does the decentralized nature of most AHCs mitigate the potential usefulness of the balanced-scorecard approach? Are the balanced scorecard's four perspectives (learning and growth, internal; customer; and financial) appropriate for AHCs, which are neither for-profit nor manufacturing organizations? The authors conclude that (1) the unique characteristics of AHCs may mitigate the full benefit of the balanced-scorecard approach, and (2) in cases where it is used, some key modifications must be made in the balanced-scorecard approach to account for those unique characteristics. For example, in a corporation, the key question from the financial perspective is "To succeed financially, how should we appear to our stockholders?" But in an AHC, this question must be revised to "What financial condition must we achieve to allow us to accomplish our mission?"

  18. A Study of the Impact of Peak Demand on Increasing Vulnerability of Cascading Failures to Extreme Contingency Events

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vyakaranam, Bharat GNVSR; Vallem, Mallikarjuna R.; Nguyen, Tony B.

    The vulnerability of large power systems to cascading failures and major blackouts has become evident since the Northeast blackout in 1965. Based on analyses of the series of cascading blackouts in the past decade, the research community realized the urgent need to develop better methods, tools, and practices for performing cascading-outage analysis and for evaluating mitigations that are easily accessible by utility planning engineers. PNNL has developed the Dynamic Contingency Analysis Tool (DCAT) as an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power planning engineers to assess the impact and likelihoodmore » of extreme contingencies and potential cascading events across their systems and interconnections. DCAT analysis will help identify potential vulnerabilities and allow study of mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. Using the DCAT capability, we examined the impacts of various load conditions to identify situations in which the power grid may encounter cascading outages that could lead to potential blackouts. This paper describes the usefulness of the DCAT tool and how it helps to understand potential impacts of load demand on cascading failures on the power system.« less

  19. Safety analysis and review system (SARS) assessment report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Browne, E.T.

    1981-03-01

    Under DOE Order 5481.1, Safety Analysis and Review System for DOE Operations, safety analyses are required for DOE projects in order to ensure that: (1) potential hazards are systematically identified; (2) potential impacts are analyzed; (3) reasonable measures have been taken to eliminate, control, or mitigate the hazards; and (4) there is documented management authorization of the DOE operation based on an objective assessment of the adequacy of the safety analysis. This report is intended to provide the DOE Office of Plans and Technology Assessment (OPTA) with an independent evaluation of the adequacy of the ongoing safety analysis effort. Asmore » part of this effort, a number of site visits and interviews were conducted, and FE SARS documents were reviewed. The latter included SARS Implementation Plans for a number of FE field offices, as well as safety analysis reports completed for certain FE operations. This report summarizes SARS related efforts at the DOE field offices visited and evaluates the extent to which they fulfill the requirements of DOE 5481.1.« less

  20. The Influence of Drivers and Barriers on Urban Adaptation and Mitigation Plans-An Empirical Analysis of European Cities.

    PubMed

    Reckien, Diana; Flacke, Johannes; Olazabal, Marta; Heidrich, Oliver

    2015-01-01

    Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future.

  1. Planning ahead for asteroid and comet hazard mitigation, phase 1: parameter space exploration and scenario modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plesko, Catherine S; Clement, R Ryan; Weaver, Robert P

    2009-01-01

    The mitigation of impact hazards resulting from Earth-approaching asteroids and comets has received much attention in the popular press. However, many questions remain about the near-term and long-term, feasibility and appropriate application of all proposed methods. Recent and ongoing ground- and space-based observations of small solar-system body composition and dynamics have revolutionized our understanding of these bodies (e.g., Ryan (2000), Fujiwara et al. (2006), and Jedicke et al. (2006)). Ongoing increases in computing power and algorithm sophistication make it possible to calculate the response of these inhomogeneous objects to proposed mitigation techniques. Here we present the first phase of amore » comprehensive hazard mitigation planning effort undertaken by Southwest Research Institute and Los Alamos National Laboratory. We begin by reviewing the parameter space of the object's physical and chemical composition and trajectory. We then use the radiation hydrocode RAGE (Gittings et al. 2008), Monte Carlo N-Particle (MCNP) radiation transport (see Clement et al., this conference), and N-body dynamics codes to explore the effects these variations in object properties have on the coupling of energy into the object from a variety of mitigation techniques, including deflection and disruption by nuclear and conventional munitions, and a kinetic impactor.« less

  2. Pimp your landscape: a tool for qualitative evaluation of the effects of regional planning measures on ecosystem services.

    PubMed

    Fürst, Christine; Volk, Martin; Pietzsch, Katrin; Makeschin, Franz

    2010-12-01

    The article presents the platform "Pimp your landscape" (PYL), which aims firstly at the support of planners by simulating alternative land-use scenarios and by an evaluation of benefits or risks for regionally important ecosystem services. Second, PYL supports an integration of information on environmental and landscape conditions into impact assessment. Third, PYL supports the integration of impacts of planning measures on ecosystem services. PYL is a modified 2-D cellular automaton with GIS features. The cells have the major attribute "land-use type" and can be supplemented with additional information, such as specifics regarding geology, topography and climate. The GIS features support the delineation of non-cellular infrastructural elements, such as roads or water bodies. An evaluation matrix represents the core element of the system. In this matrix, values in a relative scale from 0 (lowest value) to 100 (highest value) are assigned to the land-use types and infrastructural elements depending on their effect on ecosystem services. The option to configure rules for describing the impact of environmental attributes and proximity effects on cell values and land-use transition probabilities is of particular importance. User interface and usage of the platform are demonstrated by an application case. Constraints and limits of the recent version are discussed, including the need to consider in the evaluation, landscape-structure aspects such as patch size, fragmentation and spatial connectivity. Regarding the further development, it is planned to include the impact of land management practices to support climate change adaptation and mitigation strategies in regional planning.

  3. Land-Use Portfolio Modeler, Version 1.0

    USGS Publications Warehouse

    Taketa, Richard; Hong, Makiko

    2010-01-01

    Natural hazards pose significant threats to the public safety and economic health of many communities throughout the world. Community leaders and decision-makers continually face the challenges of planning and allocating limited resources to invest in protecting their communities against catastrophic losses from natural-hazard events. Public efforts to assess community vulnerability and encourage loss-reduction measures through mitigation often focused on either aggregating site-specific estimates or adopting standards based upon broad assumptions about regional risks. The site-specific method usually provided the most accurate estimates, but was prohibitively expensive, whereas regional risk assessments were often too general to be of practical use. Policy makers lacked a systematic and quantitative method for conducting a regional-scale risk assessment of natural hazards. In response, Bernknopf and others developed the portfolio model, an intermediate-scale approach to assessing natural-hazard risks and mitigation policy alternatives. The basis for the portfolio-model approach was inspired by financial portfolio theory, which prescribes a method of optimizing return on investment while reducing risk by diversifying investments in different security types. In this context, a security type represents a unique combination of features and hazard-risk level, while financial return is defined as the reduction in losses resulting from an investment in mitigation of chosen securities. Features are selected for mitigation and are modeled like investment portfolios. Earth-science and economic data for the features are combined and processed in order to analyze each of the portfolios, which are then used to evaluate the benefits of mitigating the risk in selected locations. Ultimately, the decision maker seeks to choose a portfolio representing a mitigation policy that maximizes the expected return-on-investment, while minimizing the uncertainty associated with that return-on-investment. The portfolio model, now known as the Land-Use Portfolio Model (LUPM), provided the framework for the development of the Land-Use Portfolio Modeler, Version 1.0 software (LUPM v1.0). The software provides a geographic information system (GIS)-based modeling tool for evaluating alternative risk-reduction mitigation strategies for specific natural-hazard events. The modeler uses information about a specific natural-hazard event and the features exposed to that event within the targeted study region to derive a measure of a given mitigation strategy`s effectiveness. Harnessing the spatial capabilities of a GIS enables the tool to provide a rich, interactive mapping environment in which users can create, analyze, visualize, and compare different

  4. GLIMPSE – A computational framework for supporting state-level environmental and energy planning

    EPA Pesticide Factsheets

    GLIMPSE is an EPA modeling tool for environmental and energy planning used to find U.S. policy scenarios that simultaneously improve air quality, human health, reduce impacts to ecosystems, and mitigate climate change.

  5. Coal gasification systems engineering and analysis, volume 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

  6. Climate mitigation is not the only benefit of a national energy system

    NASA Astrophysics Data System (ADS)

    Clack, C.

    2016-12-01

    Many speculate that the main driving force for a continental scale energy system is for climate mitigation. While this is a strong driver, there are multiple co-benefits that emerge from such a transition when purely driven by costs. These components could be managed within a planned system to provide a close-to-optimal solution that enhances the probability of realization. It is shown that these co-benefits of a continental scale electric system occur at costs lower than existing ones. That means there are multiple additional savings without extra costs or effort. The disadvantage is coordination between large geographic regions that could cause more complexity in planning. The main finding from different versions of the NEWS simulator is that carbon mitigation is enhanced by larger systems. In addition, there are increased jobs, reduced water consumption, Sulphur dioxide emissions, Nitrogen oxide emissions, a more distributed electric system and a lower cost of electricity.

  7. Using Scenario Planning to Evaluate the Impacts of Climate Change on Wildlife Populations and Communities in the Florida Everglades

    NASA Astrophysics Data System (ADS)

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-04-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  8. Using scenario planning to evaluate the impacts of climate change on wildlife populations and communities in the Florida Everglades

    USGS Publications Warehouse

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-01-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  9. Using scenario planning to evaluate the impacts of climate change on wildlife populations and communities in the Florida Everglades.

    PubMed

    Catano, Christopher P; Romañach, Stephanie S; Beerens, James M; Pearlstine, Leonard G; Brandt, Laura A; Hart, Kristen M; Mazzotti, Frank J; Trexler, Joel C

    2015-04-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  10. Modeling forest planning trade-offs on the Colorado Front Range using MAGIS, an optimization, spatial decision support system

    Treesearch

    Edward B. Butler

    2005-01-01

    The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...

  11. Effects of urban form on the urban heat island effect based on spatial regression model.

    PubMed

    Yin, Chaohui; Yuan, Man; Lu, Youpeng; Huang, Yaping; Liu, Yanfang

    2018-09-01

    The urban heat island (UHI) effect is becoming more of a concern with the accelerated process of urbanization. However, few studies have examined the effect of urban form on land surface temperature (LST) especially from an urban planning perspective. This paper used spatial regression model to investigate the effects of both land use composition and urban form on LST in Wuhan City, China, based on the regulatory planning management unit. Landsat ETM+ image data was used to estimate LST. Land use composition was calculated by impervious surface area proportion, vegetated area proportion, and water proportion, while urban form indicators included sky view factor (SVF), building density, and floor area ratio (FAR). We first tested for spatial autocorrelation of urban LST, which confirmed that a traditional regression method would be invalid. A spatial error model (SEM) was chosen because its parameters were better than a spatial lag model (SLM). The results showed that urban form metrics should be the focus for mitigation efforts of UHI effects. In addition, analysis of the relationship between urban form and UHI effect based on the regulatory planning management unit was helpful for promoting corresponding UHI effect mitigation rules in practice. Finally, the spatial regression model was recommended to be an appropriate method for dealing with problems related to the urban thermal environment. Results suggested that the impact of urbanization on the UHI effect can be mitigated not only by balancing various land use types, but also by optimizing urban form, which is even more effective. This research expands the scientific understanding of effects of urban form on UHI by explicitly analyzing indicators closely related to urban detailed planning at the level of regulatory planning management unit. In addition, it may provide important insights and effective regulation measures for urban planners to mitigate future UHI effects. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

    1999-07-01

    The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

  13. Plan selection strategy for rectum cancer patients: An interobserver study to assess clinical feasibility.

    PubMed

    de Jong, Rianne; Lutkenhaus, Lotte; van Wieringen, Niek; Visser, Jorrit; Wiersma, Jan; Crama, Koen; Geijsen, Debby; Bel, Arjan

    2016-08-01

    In radiotherapy for rectum cancer, the target volume is highly deformable. An adaptive plan selection strategy can mitigate the effect of these variations. The purpose of this study was to evaluate the feasibility of an adaptive strategy by assessing the interobserver variation in CBCT-based plan selection. Eleven patients with rectum cancer, treated with a non-adaptive strategy, were selected. Five CBCT scans were available per patient. To simulate the plan selection strategy, per patient three PTVs were created by varying the anterior upper mesorectum margin. For each CBCT scan, twenty observers selected the smallest PTV that encompassed the target volume. After this initial baseline measurement, the gold standard was determined during a consensus meeting, followed by a second measurement one month later. Differences between both measurements were assessed using the Wilcoxon signed-rank test. In the baseline measurement, the concordance with the gold standard was 69% (range: 60-82%), which improved to 75% (range: 60-87%) in the second measurement (p=0.01). For the second measurement, 10% of plan selections were smaller than the gold standard. With a plan selection consistency between observers of 75%, a plan selection strategy for rectum cancer patients is feasible. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  14. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  15. Hurricanes: Are You Prepared?

    PubMed

    Rodriguez, Fred H; Petersen, John; Selvaratnam, Rajeevan; Mann, Peggy; Hoyne, Jonathan B

    2018-03-21

    Severe weather events such as hurricanes have the potential to cause significant disruption of laboratory operations. Comprehensive planning is essential to mitigate the impact of such events. The essential elements of a Hurricane Plan, based on our personal experiences, are detailed in this article.

  16. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  17. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  18. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  19. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  20. Wildfire Mitigation and Private Lands: Managing Long-Term Vulnerabilities

    Treesearch

    Brian Muller; Stacey Schulte

    2006-01-01

    Long-term management of wildfire vulnerability requires strategies that address complex interactions between fire ecology and human settlement. In this paper, we examine the integration of wildfire mitigation and land use planning in county governments in the western U.S. This research relies on data from two sources. First, we conducted a survey of land use...

  1. Polishing the prism: improving wildfire mitigation planning by coupling landscape and social dimensions

    Treesearch

    Geoffrey Koch; Alan Ager; Jeff Kline; Paige Fischer

    2016-01-01

    Effectively addressing wildfire risk to communities on large multi-owner landscapes requires an understanding of the biophysical factors that influence risk, such as fuel loads, topography, and weather, and social factors such as the capacity and willingness for communities to engage in fire-mitigation activities. Biophysical and social processes often are disconnected...

  2. Evaluating options for U.S. greenhouse-gas mitigation using multiple criteria

    DOT National Transportation Integrated Search

    2009-01-01

    Choosing a set of policy responses to mitigate greenhouse gases (GHGs) responsible for climate change is one of the great challenges that the United States faces in the coming years. This paper develops a framework for evaluating GHG-mitigation polic...

  3. Understanding risk evaluation and mitigation strategies in organ transplantation.

    PubMed

    Gabardi, Steven

    2011-07-01

    The United States Food and Drug Administration (FDA) Amendments Act of 2007 mandated that Risk Evaluation and Mitigation Strategies (REMS) be required of manufacturers. These REMS are strategies implemented to manage known or potential risks associated with drugs and to ensure ongoing pharmacovigilance throughout the life of a pharmaceutical product, including once the product becomes available as generic. The elements of an individual REMS program consist of three levels: medication guide or patient package insert, communication plan, and elements to assure safe use (ETASU). A medication guide or patient package insert is used to help prevent serious adverse events, aid in patient decision making, and enhance drug adherence. Communication plans are used to educate health care providers and to encourage their compliance with REMS. The ETASU is a restrictive process that is implemented when it is deemed necessary to ensure that patients have safe access to products with known serious risks that would otherwise be unavailable. To review the components of REMS and specifically assess their impact on health care providers practicing within the organ transplantation arena, a literature search of the MEDLINE database (January 2007-December 2010) was performed, and published materials from the FDA and its Web site were also reviewed. In transplantation, REMS programs exist for both everolimus (medication guide and communication plan) and sirolimus (medication guide). The FDA has stated that all mycophenolic acid derivatives will be subject to a proposed REMS that has not yet been approved; however, both branded mycophenolic acid agents already have approved medication guides. The REMS are a permanent fixture in the development and marketing of pharmaceutical agents, and their further implementation in solid organ transplantation is inevitable. Transplantation providers should take a proactive role in patient education and implementation of REMS within the therapeutic area. It is imperative for health care providers to realize that the ultimate goals of REMS are to reduce the potential for serious risks and to make outcomes from the treatment of disease more predictable.

  4. 76 FR 41810 - Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ...] Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos, San Luis... conservation program to minimize and mitigate project activities as described in their low-effect habitat conservation plan. We invite comments from the public on the application, which includes the Francis Low-Effect...

  5. A Federal Plan for Natural Disaster Warning and Preparedness, Federal Committee for Meteorological Services and Supporting Research.

    ERIC Educational Resources Information Center

    National Oceanic and Atmospheric Administration (DOC), Rockville, MD.

    This plan to mitigate the impact of potential geophysical natural disasters, including those caused by hurricanes, tornadoes, floods and earthquakes, integrates and coordinates the multiagency functions in warning services and community preparedness related to many of these disasters. The plan is divided into five sections. The first two sections…

  6. An Analysis of Adverse Events in the Rehabilitation Department: Using the Veterans Affairs Root Cause Analysis System.

    PubMed

    Hagley, Gregory W; Mills, Peter D; Shiner, Brian; Hemphill, Robin R

    2018-04-01

    Root cause analyses (RCA) are often completed in health care settings to determine causes of adverse events (AEs). RCAs result in action plans designed to mitigate future patient harm. National reviews of RCA reports have assessed the safety of numerous health care settings and suggested opportunities for improvement. However, few studies have assessed the safety of receiving care from physical therapists, occupational therapists, or speech and language pathology pathologists. The objective of this study was to determine the types of AEs, root causes, and action plans for risk mitigation that exist within the disciplines of rehabilitation medicine. This study is a retrospective, cross-sectional review. A national search of the Veterans Health Administration RCA database was conducted to identify reports describing AEs associated with physical therapy, occupational therapy, or speech and language pathology services between 2009 and May 2016. Twenty-five reports met the inclusion requirements. The reports were classified by the event type, root cause, action plans, and strength of action plans. Delays in care (32.0%) and falls (28.0%) were the most common type of AE. Three AEs resulted in death. RCA teams identified deficits regarding policy and procedures as the most common root cause. Eighty-eight percent of RCA reports included strong or intermediate action plans to mitigate risk. Strong action plans included standardizing emergency terminology and implementing a dedicated line to call for an emergency response. These data are self-reported and only AEs that are scored as a safety assessment code 3 in the system receive a full RCA, so there are likely AEs that were not captured in this study. In addition, the RCA reports are deidentified and so do not include all patient characteristics. As the Veterans Health Administration system services mostly men, the data might not generalize to non-Veterans Health Administration systems with a different patient mix. Care provided by rehabilitation professionals is generally safe, but AEs do occur. Based on this RCA review, the safety of rehabilitation services can be improved by implementing strong practices to mitigate risk to patients. Checklists should be considered to aid timely decision making when initiating an emergency response.

  7. Succession planning for technical experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less

  8. Landscape Hazards in Yukon Communities: Geological Mapping for Climate Change Adaptation Planning

    NASA Astrophysics Data System (ADS)

    Kennedy, K.; Kinnear, L.

    2010-12-01

    Climate change is considered to be a significant challenge for northern communities where the effects of increased temperature and climate variability are beginning to affect infrastructure and livelihoods (Arctic Climate Impact Assessment, 2004). Planning for and adapting to ongoing and future changes in climate will require the identification and characterization of social, economic, cultural, political and biophysical vulnerabilities. This pilot project addresses physical landscape vulnerabilities in two communities in the Yukon Territory through community-scale landscape hazard mapping and focused investigations of community permafrost conditions. Landscape hazards are identified by combining pre-existing data from public utilities and private-sector consultants with new geophysical techniques (ground penetrating radar and electrical resistivity), shallow drilling, surficial geological mapping, and permafrost characterization. Existing landscape vulnerabilities are evaluated based on their potential for hazard (low, medium or high) under current climate conditions, as well as under future climate scenarios. Detailed hazard maps and landscape characterizations for both communities will contribute to overall adaptation plans and allow for informed development, planning and mitigation of potentially threatening hazards in and around the communities.

  9. Risk and the neoliberal state: why post-Mitch lessons didn't reduce El Salvador's earthquake losses.

    PubMed

    Wisner, B

    2001-09-01

    Although El Salvador suffered light losses from Hurricane Mitch in 1998, it benefited from the increased international aid and encouragement for advance planning, especially mitigation and prevention interventions. Thus, one would have supposed, El Salvador would have been in a very advantageous position, able more easily than its economically crippled neighbours, Honduras and Nicaragua, to implement the 'lessons of Mitch'. A review of the recovery plan tabled by the El Salvador government following the earthquakes of early 2001 shows that despite the rhetoric in favour of 'learning the lessons of Mitch', very little mitigation and prevention had actually been put in place between the hurricane (1998) and the earthquakes (2001). The recovery plan is analysed in terms of the degree to which it deals with root causes of disaster vulnerability, namely, the economic and political marginality of much of the population and environmental degradation. An explanation for the failure to implement mitigation and preventive actions is traced to the adherence by the government of El Salvador to an extreme form of neoliberal, free market ideology, and the deep fissures and mistrust in a country that follow a long and bloody civil war.

  10. Managing Research in a Risk World

    NASA Technical Reports Server (NTRS)

    Anton, W.; Havenhill, M.

    2014-01-01

    The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

  11. Mitigation planning for raptors during mining

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Platt, S.W.; Hargis, N.E.

    1990-12-31

    Birds of prey and their eggs, young and nests are protected by state and federal laws and regulations. Surface mining operators may experience conflicts with raptors when expanding into nesting areas or when raptors are attracted into mining areas. State and federal permits are required for disturbance or manipulation of birds of prey. Mitigation planning for raptors begins before mining and continues through mining. As conflict situations changes, so must the mitigation plan. Before each nesting season the mining schedule should be compared to areas of known raptor nesting activity. If overlap occurs, nest protection measures may be needed. Areasmore » of potential conflict should be patrolled regularly to identify the presence of a raptor pair and nest starts. Should a raptor nest be built and eggs laid, a change in the mining schedule or an egg or brood manipulation may resolve the conflict. Bridger Coal Company has successfully mitigated conflicts with 3 raptor species. A ferruginous hawk (Buteo regalis) nest with brood was successfully relocated across a pit. Red-tailed hawk (B. jamaicensis) egg clutches were removed from 2 highwall nests and transported in a portable incubator to a commercial raptor propagator where they were hatched, fed and conspecifically imprinted until achieving self-thermoregulation. All chicks were returned to the mine and successfully placed into foster nests. A metal artificial nest ledge for a prairie falcon (Falco mexicanus) was constructed in a cliff and a traditional nesting ledge rendered inaccessible. The falcon pair successfully nested in the artificial ledge.« less

  12. Population growth is a variable open to change

    NASA Astrophysics Data System (ADS)

    Potts, M.

    2016-12-01

    The absolute number of people and the rate of population growth have an impact on climate mitigation, adaptation and possible conflict. Half the pregnancies in the US are unintended. Robust quantitative evidence from California demonstrates that improving access to family planning is the single most cost-effective way of mitigating our carbon footprint. Globally, there are 80 million unintended pregnancies annually. Many non-evidence barriers deprive women of the information and means required to separate sex from childbearing. Between 1960 and 1990, meeting the need for family planning led to a rapid fall in family size in much of Asia. Since 1990, funding for family planning has collapsed and fertility decline has stalled. The UN projects that by 2100 global population will increase by 3.8 billion (equal to world population in 1975). 80% of this growth will be in Africa. Studies project that climate change will undermine crop yields in parts of Africa, especially the Sahel. A high ratio of young males to the rest of the population is a risk factor in conflict. Today, only 1% of overseas assistance is allocated to family planning. Based on analysis of the past, doubling that investment would accelerate fertility decline, facilitating climate mitigation and adaptation, and possibly reducing conflict. Population and family planning were pushed off the international agenda by unacceptably and tragic episodes of coercion in China and India. However, there is compelling data that when voluntary family planning is widely available then family size can fall rapidly, as occurred in the Islamic Republic of Iran, where fertility fell more rapidly than in any other country in history. Family planning is listening to what women want not telling people want to do. Population growth is a variable open to change in a human rights framework. Population and family planning are variables relevant to the scientific agenda of the AGU.

  13. The Role of Compensation Criteria to Minimize Face-Time Bias and Support Faculty Career Flexibility

    PubMed Central

    Elsbach, Kimberly D.; Villablanca, Amparo C.

    2016-01-01

    Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school’s policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear “face-time bias,” which negatively affects evaluation of those not “seen” at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department. PMID:28725757

  14. Reliability Demonstration Approach for Advanced Stirling Radioisotope Generator

    NASA Technical Reports Server (NTRS)

    Ha, CHuong; Zampino, Edward; Penswick, Barry; Spronz, Michael

    2010-01-01

    Developed for future space missions as a high-efficiency power system, the Advanced Stirling Radioisotope Generator (ASRG) has a design life requirement of 14 yr in space following a potential storage of 3 yr after fueling. In general, the demonstration of long-life dynamic systems remains difficult in part due to the perception that the wearout of moving parts cannot be minimized, and associated failures are unpredictable. This paper shows a combination of systematic analytical methods, extensive experience gained from technology development, and well-planned tests can be used to ensure a high level reliability of ASRG. With this approach, all potential risks from each life phase of the system are evaluated and the mitigation adequately addressed. This paper also provides a summary of important test results obtained to date for ASRG and the planned effort for system-level extended operation.

  15. Risk-Aware Planetary Rover Operation: Autonomous Terrain Classification and Path Planning

    NASA Technical Reports Server (NTRS)

    Ono, Masahiro; Fuchs, Thoams J.; Steffy, Amanda; Maimone, Mark; Yen, Jeng

    2015-01-01

    Identifying and avoiding terrain hazards (e.g., soft soil and pointy embedded rocks) are crucial for the safety of planetary rovers. This paper presents a newly developed groundbased Mars rover operation tool that mitigates risks from terrain by automatically identifying hazards on the terrain, evaluating their risks, and suggesting operators safe paths options that avoids potential risks while achieving specified goals. The tool will bring benefits to rover operations by reducing operation cost, by reducing cognitive load of rover operators, by preventing human errors, and most importantly, by significantly reducing the risk of the loss of rovers.

  16. U.S. Geological Survey toxic Waste-Groundwater Contamination Program, fiscal year 1985

    NASA Astrophysics Data System (ADS)

    Ragone, Stephen E.

    1986-09-01

    In fiscal year 1982, the U S Geological Survey began an interdisciplinary research thrust entitled Toxic Waste-Groundwater Contamination Program The objective of the thrust was to provide earth sciences information necessary to evaluate and mitigate existing groundwater contamination problems resulting from the planned or inadvertant disposal of wastes and from certain land-use practices, and to improve future waste disposal and land-use practices The program supports process-oriented and interdisciplinary field research, and regional groundwater quality studies This article provides an overview of the current (Fiscal Year 1985) activities of the Toxic Waste Program

  17. Is climate change modifying precipitation extremes?

    NASA Astrophysics Data System (ADS)

    Montanari, Alberto; Papalexiou, Simon Michael

    2016-04-01

    The title of the present contribution is a relevant question that is frequently posed to scientists, technicians and managers of local authorities. Although several research efforts were recently dedicated to rainfall observation, analysis and modelling, the above question remains essentially unanswered. The question comes from the awareness that the frequency of floods and the related socio-economic impacts are increasing in many countries, and climate change is deemed to be the main trigger. Indeed, identifying the real reasons for the observed increase of flood risk is necessary in order to plan effective mitigation and adaptation strategies. While mitigation of climate change is an extremely important issue at the global level, at small spatial scales several other triggers may interact with it, therefore requiring different mitigation strategies. Similarly, the responsibilities of administrators are radically different at local and global scales. This talk aims to provide insights and information to address the question expressed by its title. High resolution and long term rainfall data will be presented, as well as an analysis of the frequency of their extremes and its progress in time. The results will provide pragmatic indications for the sake of better planning flood risk mitigation policies.

  18. Green cities, smart people and climate change

    NASA Astrophysics Data System (ADS)

    Mansouri Kouhestani, F.; Byrne, J. M.; Hazendonk, P.; Brown, M. B.; Harrison, T.

    2014-12-01

    Climate change will require substantial changes to urban environments. Cities are huge sources of greenhouse gases. Further, cities will suffer tremendously under climate change due to heat stresses, urban flooding, energy and water supply and demand changes, transportation problems, resource supply and demand and a host of other trials and tribulations. Cities that evolve most quickly and efficiently to deal with climate change will likely take advantage of the changes to create enjoyable, healthy and safer living spaces for families and communities. Technology will provide much of the capability to both mitigate and adapt our cities BUT education and coordination of citizen and community lifestyle likely offers equal opportunities to make our cities more sustainable and more enjoyable places to live. This work is the first phase of a major project evaluating urban mitigation and adaptation policies, programs and technologies. All options are considered, from changes in engineering, planning and management; and including a range of citizen and population-based lifestyle practices.

  19. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  20. An evaluation of the effectiveness of existing North Carolina Department of Transportation wetland mitigation sites, phase 1 report

    DOT National Transportation Integrated Search

    2000-07-01

    In this study, 49 North Carolina Department of Transportation (NCDOT) wetland compensatory mitigation sites and 11 reference sites were evaluated on-site in 1999. Seventeen of the larger sites consisted of more than one type of mitigation (restoratio...

  1. An evaluation of North Carolina Department of Transportation wetland mitigation sites : selected case studies, phase 2 report.

    DOT National Transportation Integrated Search

    2012-03-01

    Phase 1 of this study evaluated 50 NCDOT wetland compensatory mitigation sites and 11 reference sites in 1999. The : Phase 2 component (this report) examines five of the compensatory mitigation sites to provide a more in-depth analysis. The : objecti...

  2. The Influence of Drivers and Barriers on Urban Adaptation and Mitigation Plans—An Empirical Analysis of European Cities

    PubMed Central

    Reckien, Diana; Flacke, Johannes

    2015-01-01

    Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future. PMID:26317420

  3. 24 CFR 203.605 - Loss mitigation performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Loss mitigation performance. 203....605 Loss mitigation performance. (a) Duty to mitigate. Before four full monthly installments due on... mitigation techniques provided at § 203.501 to determine which is appropriate. Based upon such evaluations...

  4. 24 CFR 203.605 - Loss mitigation performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Loss mitigation performance. 203....605 Loss mitigation performance. (a) Duty to mitigate. Before four full monthly installments due on... mitigation techniques provided at § 203.501 to determine which is appropriate. Based upon such evaluations...

  5. 24 CFR 203.605 - Loss mitigation performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Loss mitigation performance. 203....605 Loss mitigation performance. (a) Duty to mitigate. Before four full monthly installments due on... mitigation techniques provided at § 203.501 to determine which is appropriate. Based upon such evaluations...

  6. 24 CFR 203.605 - Loss mitigation performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Loss mitigation performance. 203....605 Loss mitigation performance. (a) Duty to mitigate. Before four full monthly installments due on... mitigation techniques provided at § 203.501 to determine which is appropriate. Based upon such evaluations...

  7. Habitat suitability index models: A low effort system for planned coolwater and coldwater reservoirs

    USGS Publications Warehouse

    McConnell, William J.; Bergersen, Eric P.; Williamson, Kathryn L.

    1982-01-01

    A novel approach to reservoir habitat evaluation is described and habitat ratings are proposed for five fish species in coolwater and coldwater reservoirs. This approach has the advantages of procedural simplicity and ready availability of input data; consequently, it has potential utility as a screening tool in the early stages of the reservoir planning process.Habitat suitability is determined on the basis of a composite score for five "primary" reservoir attributes (temperature, turbidity, nonliving cover, drawdown, and shallow cove frequency). The va 1ue of each primary reservoi r attribute is determined from one or more "secondary" attributes, which are easily measured variables. Secondary attributes (for example, length of growing season or mean July air temperature) can be directly obtained, prior to construction, from published documents, maps, reservoir plans, and on-site inspections of the proposed reservoir basin.Evaluation criteria and ratings are presented for rainbow trout (Salmo gairdneri), white sucker (Catostomus commersonii), yellow perch (Perca flavescens), common carp (Cyprinus carpio), and black crappie (PomoxTS nigromaculatus). These ratings were derived from literature reviews and from persona 1 experi ence and knowl edge of the authors; however, the system is easily adaptable to change upon further review, differences of opinion by experts, or evaluation of test results under diverse conditions.This technique can be used to evaluate the suitability of a proposed reservoir for different species and to compare the outcomes of alternative construction plans. It could also be expanded to include additional species, which will improve its utility. The system should be useful in determining losses relative to benefits, trade-offs, and potential mitigation measures in reservoir projects.

  8. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  9. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  10. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... events. (ii) A description of the Indian tribal government's vulnerability to the hazards described in... its impact on the tribe. The plan should describe vulnerability in terms of: (A) The types and numbers... or avoid long-term vulnerabilities to the identified hazards. (ii) A section that identifies and...

  11. 75 FR 20780 - Approval and Promulgation of Implementation Plans; Revisions to the Kentucky State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... transportation conformity revisions to the Kentucky State Implementation Plan (SIP) submitted by the Commonwealth...). This addition consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The...

  12. 75 FR 66319 - State Systems Advance Planning Document (APD) Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...

  13. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    NASA Astrophysics Data System (ADS)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.

  14. Strategy for Mitigating Collision Between Landsat-5 and the Afternoon Constellation

    NASA Technical Reports Server (NTRS)

    Levi, Joshua A.; Palmer, Eric J.

    2011-01-01

    The NASA Goddard Space Flight Center Earth Science Mission Operations project, the French space agency Centre National d tudes Spatiales, the Argentinian space agency Comisi n Nacional de Actividades Espaciales, and the United States Geological Survey all operate spacecraft in sun-synchronous frozen orbits. The orbits are planned to not place any of the spacecraft at risk of colliding with another. However, evolution of these orbits over time has com-promised the safe interaction between Landsat-5 and the Afternoon Constella-tion. This paper analyzes the interactions between the Landsat-5 spacecraft and the Afternoon Constellation members over a period of 6 years, describing the current risk and plan to mitigate collisions in the future.

  15. TH-CD-209-01: A Greedy Reassignment Algorithm for the PBS Minimum Monitor Unit Constraint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Y; Kooy, H; Craft, D

    2016-06-15

    Purpose: To investigate a Greedy Reassignment algorithm in order to mitigate the effects of low weight spots in proton pencil beam scanning (PBS) treatment plans. Methods: To convert a plan from the treatment planning system’s (TPS) to a deliverable plan, post processing methods can be used to adjust the spot maps to meets the minimum MU constraint. Existing methods include: deleting low weight spots (Cut method), or rounding spots with weight above/below half the limit up/down to the limit/zero (Round method). An alternative method called Greedy Reassignment was developed in this work in which the lowest weight spot in themore » field was removed and its weight reassigned equally among its nearest neighbors. The process was repeated with the next lowest weight spot until all spots in the field were above the MU constraint. The algorithm performance was evaluated using plans collected from 190 patients (496 fields) treated at our facility. The evaluation criteria were the γ-index pass rate comparing the pre-processed and post-processed dose distributions. A planning metric was further developed to predict the impact of post-processing on treatment plans for various treatment planning, machine, and dose tolerance parameters. Results: For fields with a gamma pass rate of 90±1%, the metric has a standard deviation equal to 18% of the centroid value. This showed that the metric and γ-index pass rate are correlated for the Greedy Reassignment algorithm. Using a 3rd order polynomial fit to the data, the Greedy Reassignment method had 1.8 times better metric at 90% pass rate compared to other post-processing methods. Conclusion: We showed that the Greedy Reassignment method yields deliverable plans that are closest to the optimized-without-MU-constraint plan from the TPS. The metric developed in this work could help design the minimum MU threshold with the goal of keeping the γ-index pass rate above an acceptable value.« less

  16. Construction of a New Fire Station, Demolition of Buildings 530 and 606 and Relocation of the Hazardous Cargo Area at Grand Forks Air Force Base, North Dakota. Finding of No Significant Impact (FOSNI). Finding of No Practical Alternative(FONPA)

    DTIC Science & Technology

    2009-09-23

    hawthorn, buffaloberry and snowberry also are found in the area. In wetland areas, predominant species include Typha sp., smartweed, wild millet, cord...does not straddle the airfield flight line fence. This location will require wetland mitigation for 0.03 wetlands determined to be jurisdictional by... wetlands construction or restoration at either a wetland mitigation bank or a suitable location on base. A formal mitigation plan will be developed

  17. Evaluation and Mitigation of the Risk Due to Climate Change at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.

    2016-12-01

    The state of South Carolina, home to the Department of Energy's (DOE) Savannah River Site (SRS), has been identified as facing an `above average' risk due to extreme heat, and the threat due to wildfire is expected to nearly double by 2050. To comply with DOE requirements that each of its sites prepares for climate change, the Savannah River National Laboratory (SRNL) is involved in an ongoing process to evaluate the site vulnerability and establish policies to mitigate those effects. This requires close cooperation between the managers of various site facilities and on-site climate researchers. The Atmospheric Technologies Group at SRNL currently provides short-term weather forecasts to support outdoor activities on site, but is also now working with site decision-makers to achieve DOE's goals of climate change mitigation and adaptation. We will discuss the results of our climate vulnerability assessment, which includes the effects of climate change on the energy requirements for mission critical infrastructure, the health, safety and productivity of the outdoor workforce, the danger of fire in the SRS forest, and the levels of surface water impoundments. (The latter of which must be maintained to avoid the release of radioactive contaminants sequestered beneath them). For each of these, existing climate change projections were carefully studied and `translated' into numerical indices relevant to facility personnel at SRS, along with a vulnerability rating (also based on conversations with site workers) to estimate the most endangered `assets'. We will also explain the process we have developed to facilitate effective communication between researchers and managers - involving them both in the development of the climate vulnerability assessment and the next steps toward planning, resource allocation, actions to mitigate rising costs, and safety considerations as well as helping the site remain sustainable throughout the future of its missions.

  18. 75 FR 27464 - Special Reporting, Analysis and Contingent Resolution Plans at Certain Large Insured Depository...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...

  19. 76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Protection Plan. The Biological Resources Mitigation Implementation and Monitoring Plan will include accurate... consideration that water is a limited resource, the Project owner would use dry cooling, which avoids... markets and transmits wholesale electrical power through an integrated 17,000-circuit mile, high- voltage...

  20. L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2009-09-29

    Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less

  1. Mitigating effects of vaccination on influenza outbreaks given constraints in stockpile size and daily administration capacity

    PubMed Central

    2011-01-01

    Background Influenza viruses are a major cause of morbidity and mortality worldwide. Vaccination remains a powerful tool for preventing or mitigating influenza outbreaks. Yet, vaccine supplies and daily administration capacities are limited, even in developed countries. Understanding how such constraints can alter the mitigating effects of vaccination is a crucial part of influenza preparedness plans. Mathematical models provide tools for government and medical officials to assess the impact of different vaccination strategies and plan accordingly. However, many existing models of vaccination employ several questionable assumptions, including a rate of vaccination proportional to the population at each point in time. Methods We present a SIR-like model that explicitly takes into account vaccine supply and the number of vaccines administered per day and places data-informed limits on these parameters. We refer to this as the non-proportional model of vaccination and compare it to the proportional scheme typically found in the literature. Results The proportional and non-proportional models behave similarly for a few different vaccination scenarios. However, there are parameter regimes involving the vaccination campaign duration and daily supply limit for which the non-proportional model predicts smaller epidemics that peak later, but may last longer, than those of the proportional model. We also use the non-proportional model to predict the mitigating effects of variably timed vaccination campaigns for different levels of vaccination coverage, using specific constraints on daily administration capacity. Conclusions The non-proportional model of vaccination is a theoretical improvement that provides more accurate predictions of the mitigating effects of vaccination on influenza outbreaks than the proportional model. In addition, parameters such as vaccine supply and daily administration limit can be easily adjusted to simulate conditions in developed and developing nations with a wide variety of financial and medical resources. Finally, the model can be used by government and medical officials to create customized pandemic preparedness plans based on the supply and administration constraints of specific communities. PMID:21806800

  2. A multi-period optimization model for energy planning with CO(2) emission consideration.

    PubMed

    Mirzaesmaeeli, H; Elkamel, A; Douglas, P L; Croiset, E; Gupta, M

    2010-05-01

    A novel deterministic multi-period mixed-integer linear programming (MILP) model for the power generation planning of electric systems is described and evaluated in this paper. The model is developed with the objective of determining the optimal mix of energy supply sources and pollutant mitigation options that meet a specified electricity demand and CO(2) emission targets at minimum cost. Several time-dependent parameters are included in the model formulation; they include forecasted energy demand, fuel price variability, construction lead time, conservation initiatives, and increase in fixed operational and maintenance costs over time. The developed model is applied to two case studies. The objective of the case studies is to examine the economical, structural, and environmental effects that would result if the electricity sector was required to reduce its CO(2) emissions to a specified limit. Copyright 2009 Elsevier Ltd. All rights reserved.

  3. Assessing qualitative long-term volcanic hazards at Lanzarote Island (Canary Islands)

    NASA Astrophysics Data System (ADS)

    Becerril, Laura; Martí, Joan; Bartolini, Stefania; Geyer, Adelina

    2017-07-01

    Conducting long-term hazard assessment in active volcanic areas is of primary importance for land-use planning and defining emergency plans able to be applied in case of a crisis. A definition of scenario hazard maps helps to mitigate the consequences of future eruptions by anticipating the events that may occur. Lanzarote is an active volcanic island that has hosted the largest (> 1.5 km3 DRE) and longest (6 years) eruption, the Timanfaya eruption (1730-1736), on the Canary Islands in historical times (last 600 years). This eruption brought severe economic losses and forced local people to migrate. In spite of all these facts, no comprehensive hazard assessment or hazard maps have been developed for the island. In this work, we present an integrated long-term volcanic hazard evaluation using a systematic methodology that includes spatial analysis and simulations of the most probable eruptive scenarios.

  4. Waste Treatment And Immobilization Plant U. S. Department Of Energy Office Of River Protection Submerged Bed Scrubber Condensate Disposition Project - Abstract # 13460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yanochko, Ronald M; Corcoran, Connie

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potentialmore » issues associated with recycling.« less

  5. School closure as an influenza mitigation strategy: how variations in legal authority and plan criteria can alter the impact.

    PubMed

    Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S

    2012-11-14

    States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.

  6. Examination of Icing Induced Loss of Control and Its Mitigations

    NASA Technical Reports Server (NTRS)

    Reehorst, Andrew L.; Addy, Harold E., Jr.; Colantonio, Renato O.

    2010-01-01

    Factors external to the aircraft are often a significant causal factor in loss of control (LOC) accidents. In today s aviation world, very few accidents stem from a single cause and typically have a number of causal factors that culminate in a LOC accident. Very often the "trigger" that initiates an accident sequence is an external environment factor. In a recent NASA statistical analysis of LOC accidents, aircraft icing was shown to be the most common external environmental LOC causal factor for scheduled operations. When investigating LOC accident or incidents aircraft icing causal factors can be categorized into groups of 1) in-flight encounter with super-cooled liquid water clouds, 2) take-off with ice contamination, or 3) in-flight encounter with high concentrations of ice crystals. As with other flight hazards, icing induced LOC accidents can be prevented through avoidance, detection, and recovery mitigations. For icing hazards, avoidance can take the form of avoiding flight into icing conditions or avoiding the hazard of icing by making the aircraft tolerant to icing conditions. Icing detection mitigations can take the form of detecting icing conditions or detecting early performance degradation caused by icing. Recovery from icing induced LOC requires flight crew or automated systems capable of accounting for reduced aircraft performance and degraded control authority during the recovery maneuvers. In this report we review the icing induced LOC accident mitigations defined in a recent LOC study and for each mitigation describe a research topic required to enable or strengthen the mitigation. Many of these research topics are already included in ongoing or planned NASA icing research activities or are being addressed by members of the icing research community. These research activities are described and the status of the ongoing or planned research to address the technology needs is discussed

  7. A portfolio approach to evaluating natural hazard mitigation policies: An Application to lateral-spread ground failure in Coastal California

    USGS Publications Warehouse

    Bernknopf, R.L.; Dinitz, L.B.; Rabinovici, S.J.M.; Evans, A.M.

    2001-01-01

    In the past, efforts to prevent catastrophic losses from natural hazards have largely been undertaken by individual property owners based on site-specific evaluations of risks to particular buildings. Public efforts to assess community vulnerability and encourage mitigation have focused on either aggregating site-specific estimates or adopting standards based upon broad assumptions about regional risks. This paper develops an alternative, intermediate-scale approach to regional risk assessment and the evaluation of community mitigation policies. Properties are grouped into types with similar land uses and levels of hazard, and hypothetical community mitigation strategies for protecting these properties are modeled like investment portfolios. The portfolios consist of investments in mitigation against the risk to a community posed by a specific natural hazard, and are defined by a community's mitigation budget and the proportion of the budget invested in locations of each type. The usefulness of this approach is demonstrated through an integrated assessment of earthquake-induced lateral-spread ground failure risk in the Watsonville, California area. Data from the magnitude 6.9 Loma Prieta earthquake of 1989 are used to model lateral-spread ground failure susceptibility. Earth science and economic data are combined and analyzed in a Geographic Information System (GIS). The portfolio model is then used to evaluate the benefits of mitigating the risk in different locations. Two mitigation policies, one that prioritizes mitigation by land use type and the other by hazard zone, are compared with a status quo policy of doing no further mitigation beyond that which already exists. The portfolio representing the hazard zone rule yields a higher expected return than the land use portfolio does: However, the hazard zone portfolio experiences a higher standard deviation. Therefore, neither portfolio is clearly preferred. The two mitigation policies both reduce expected losses and increase overall expected community wealth compared to the status quo policy.

  8. The Role of Compensation Criteria to Minimize Face-Time Bias and Support Faculty Career Flexibility: An Approach to Enhance Career Satisfaction in Academic Pathology.

    PubMed

    Howell, Lydia Pleotis; Elsbach, Kimberly D; Villablanca, Amparo C

    2016-01-01

    Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school's policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear "face-time bias," which negatively affects evaluation of those not "seen" at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department.

  9. Implementation of Non-Pharmaceutical Interventions by New York City Public Schools to Prevent 2009 Influenza A

    PubMed Central

    Agolory, Simon G.; Barbot, Oxiris; Averhoff, Francisco; Weiss, Don; Wilson, Elisha; Egger, Joseph; Miller, Jeffery; Ogbuanu, Ikechukwu; Walton, Sabrina; Kahn, Emily

    2013-01-01

    Introduction Children are important transmitters of influenza in the community and a number of non-pharmaceutical interventions (NPIs), including hand washing and use of hand sanitizer, have been recommended to mitigate the transmission of influenza, but limited information is available regarding schools' ability to implement these NPIs during an influenza outbreak. We evaluated implementation of NPIs during fall 2009 in response to H1N1 pandemic influenza (pH1N1) by New York City (NYC) public schools. Methods From January 25 through February 9, 2010, an online survey was sent to all the 1,632 NYC public schools and principals were asked to participate in the survey or to designate a school nurse or other school official with knowledge of school policies and characteristics to do so. Results Of 1,633 schools, 376(23%) accessed and completed the survey. Nearly all respondents (99%) implemented at least two NPIs. Schools that had a Flu Response Team (FRT) as a part of school emergency preparedness plan were more likely to implement the NPI guidelines recommended by NYC public health officials than schools that did not have a FRT. Designation of a room for isolating ill students, for example, was more common in schools with a FRT (72%) than those without (53%) (p<0.001). Conclusions Implementing an NPI program in a large school system to mitigate the effects of an influenza outbreak is feasible, but there is potential need for additional resources in some schools to increase capacity and adherence to all recommendations. Public health influenza-preparedness plans should include school preparedness planning and FRTs. PMID:23341877

  10. National Wetland Mitigation Banking Study Wetland Migitation Banking.

    DTIC Science & Technology

    1994-02-01

    the rest, but granted easements to HBWC 4. Mid City Ranch Humboldt CA Fish & Game CA Fish & Game, Humboldt CA Fish & Game County , CA City of...Eureka, Humboldt County County , City of Eureka 5. Mission Viejo/ Orange Mission Viejo USFWS, CA Dept. multiple - public- Orange ACWHEP...Broadway Wetlands Restoration Conceptual Plan yes in Humboldt County 6 - acre bank on 13-acre parcel mitigates for ’pockef marshes (2 acres

  11. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  12. Focusing Events and Constrains on Policy Addressing Long-Term Climate Change Risks

    NASA Astrophysics Data System (ADS)

    O'Donovan, K.

    2014-12-01

    When policy makers are aware of immediate and long-term risks to communities, what do they do to plan for and mitigate the effects of climate change? This paper addresses that question in two ways. First, as an organizing framework it presents an overview of the empirical evidence on focusing events. Focusing events are defined as sudden, rare events that reveal harm or the potential for future harm that the general public and policy makers become aware of simultaneously. These large-scale events are typically natural and disasters, crisis, or technological accidents. This paper considers the empirical evidence of the relationship between focusing events, the harm revealed by the event and policy change aimed at reducing future risk of harm. Second, this paper reviews the case of flood mitigation policy in the United States from 1968 to 2008. It considers the ways in which policy makers have and have not integrated future flood risks into mitigation policy and planning, particularly after large-scale floods. It analyzes the political, intergovernmental, demographic and geographic factors that have promoted and constrained long-term flood mitigation policy. This paper concludes with a discussion of the meaning and implications of potential focusing events and constrains on policy for long-term climate change concerns.

  13. Using logic models in a community-based agricultural injury prevention project.

    PubMed

    Helitzer, Deborah; Willging, Cathleen; Hathorn, Gary; Benally, Jeannie

    2009-01-01

    The National Institute for Occupational Safety and Health has long promoted the logic model as a useful tool in an evaluator's portfolio. Because a logic model supports a systematic approach to designing interventions, it is equally useful for program planners. Undertaken with community stakeholders, a logic model process articulates the underlying foundations of a particular programmatic effort and enhances program design and evaluation. Most often presented as sequenced diagrams or flow charts, logic models demonstrate relationships among the following components: statement of a problem, various causal and mitigating factors related to that problem, available resources to address the problem, theoretical foundations of the selected intervention, intervention goals and planned activities, and anticipated short- and long-term outcomes. This article describes a case example of how a logic model process was used to help community stakeholders on the Navajo Nation conceive, design, implement, and evaluate agricultural injury prevention projects.

  14. Analysis of Intensity-Modulated Radiation Therapy (IMRT), Proton and 3D Conformal Radiotherapy (3D-CRT) for Reducing Perioperative Cardiopulmonary Complications in Esophageal Cancer Patients.

    PubMed

    Ling, Ted C; Slater, Jerry M; Nookala, Prashanth; Mifflin, Rachel; Grove, Roger; Ly, Anh M; Patyal, Baldev; Slater, Jerry D; Yang, Gary Y

    2014-12-05

    Background. While neoadjuvant concurrent chemoradiotherapy has improved outcomes for esophageal cancer patients, surgical complication rates remain high. The most frequent perioperative complications after trimodality therapy were cardiopulmonary in nature. The radiation modality utilized can be a strong mitigating factor of perioperative complications given the location of the esophagus and its proximity to the heart and lungs. The purpose of this study is to make a dosimetric comparison of Intensity-Modulated Radiation Therapy (IMRT), proton and 3D conformal radiotherapy (3D-CRT) with regard to reducing perioperative cardiopulmonary complications in esophageal cancer patients. Materials. Ten patients with esophageal cancer treated between 2010 and 2013 were evaluated in this study. All patients were simulated with contrast-enhanced CT imaging. Separate treatment plans using proton radiotherapy, IMRT, and 3D-CRT modalities were created for each patient. Dose-volume histograms were calculated and analyzed to compare plans between the three modalities. The organs at risk (OAR) being evaluated in this study are the heart, lungs, and spinal cord. To determine statistical significance, ANOVA and two-tailed paired t-tests were performed for all data parameters. Results. The proton plans showed decreased dose to various volumes of the heart and lungs in comparison to both the IMRT and 3D-CRT plans. There was no difference between the IMRT and 3D-CRT plans in dose delivered to the lung or heart. This finding was seen consistently across the parameters analyzed in this study. Conclusions. In patients receiving radiation therapy for esophageal cancer, proton plans are technically feasible while achieving adequate coverage with lower doses delivered to the lungs and cardiac structures. This may result in decreased cardiopulmonary toxicity and less morbidity to esophageal cancer patients.

  15. Analysis of Intensity-Modulated Radiation Therapy (IMRT), Proton and 3D Conformal Radiotherapy (3D-CRT) for Reducing Perioperative Cardiopulmonary Complications in Esophageal Cancer Patients

    PubMed Central

    Ling, Ted C.; Slater, Jerry M.; Nookala, Prashanth; Mifflin, Rachel; Grove, Roger; Ly, Anh M.; Patyal, Baldev; Slater, Jerry D.; Yang, Gary Y.

    2014-01-01

    Background. While neoadjuvant concurrent chemoradiotherapy has improved outcomes for esophageal cancer patients, surgical complication rates remain high. The most frequent perioperative complications after trimodality therapy were cardiopulmonary in nature. The radiation modality utilized can be a strong mitigating factor of perioperative complications given the location of the esophagus and its proximity to the heart and lungs. The purpose of this study is to make a dosimetric comparison of Intensity-Modulated Radiation Therapy (IMRT), proton and 3D conformal radiotherapy (3D-CRT) with regard to reducing perioperative cardiopulmonary complications in esophageal cancer patients. Materials. Ten patients with esophageal cancer treated between 2010 and 2013 were evaluated in this study. All patients were simulated with contrast-enhanced CT imaging. Separate treatment plans using proton radiotherapy, IMRT, and 3D-CRT modalities were created for each patient. Dose-volume histograms were calculated and analyzed to compare plans between the three modalities. The organs at risk (OAR) being evaluated in this study are the heart, lungs, and spinal cord. To determine statistical significance, ANOVA and two-tailed paired t-tests were performed for all data parameters. Results. The proton plans showed decreased dose to various volumes of the heart and lungs in comparison to both the IMRT and 3D-CRT plans. There was no difference between the IMRT and 3D-CRT plans in dose delivered to the lung or heart. This finding was seen consistently across the parameters analyzed in this study. Conclusions. In patients receiving radiation therapy for esophageal cancer, proton plans are technically feasible while achieving adequate coverage with lower doses delivered to the lungs and cardiac structures. This may result in decreased cardiopulmonary toxicity and less morbidity to esophageal cancer patients. PMID:25489937

  16. Developing a Methodology for Risk-Informed Trade-Space Analysis in Acquisition

    DTIC Science & Technology

    2015-01-01

    73 6.10. Research, Development, Test, and Evaluation Cost Distribution, Technology 1 Mitigation of...6.11. Research, Development, Test, and Evaluation Cost Distribution, Technology 3 Mitigation of the Upgrade Alternative...courses of action, or risk- mitigation behaviors, which take place in the event that the technology is not developed by the mile- stone date (e.g

  17. Evaluation of Green Infrastructure on Peak Flow Mitigation Focusing on the Connectivity of Impervious Areas

    NASA Astrophysics Data System (ADS)

    Seo, Y.; Hwang, J.; Kwon, Y.

    2017-12-01

    The existence of impervious areas is one of the most distinguishing characteristics of urban catchments. It decreases infiltration and increases direct runoff in urban catchments. The recent introduction of green infrastructure in urban catchments for the purpose of sustainable development contributes to the decrease of the directly connected impervious areas (DCIA) by isolating existing impervious areas and consequently, to the flood risk mitigation. This study coupled the width function-based instantaneous hydrograph (WFIUH), which is able to handle the spatial distribution of the impervious areas, with the concept of the DCIA to assess the impact of decreasing DCIA on the shape of direct runoff hydrographs. Using several scenarios for typical green infrastructure and corresponding changes of DCIA in a test catchment, this study evaluated the effect of green infrastructure on the shape of the resulting direct runoff hydrographs and peak flows. The results showed that the changes in the DCIA immediately affects the shape of the direct runoff hydrograph and decreases peak flows depending on spatial implementation scenarios. The quantitative assessment of the spatial distribution of impervious areas and also the changes to the DCIA suggests effective and well-planned green infrastructure can be introduced in urban environments for flood risk management.

  18. Risk evaluation mitigation strategies: the evolution of risk management policy.

    PubMed

    Hollingsworth, Kristen; Toscani, Michael

    2013-04-01

    The United States Food and Drug Administration (FDA) has the primary regulatory responsibility to ensure that medications are safe and effective both prior to drug approval and while the medication is being actively marketed by manufacturers. The responsibility for safe medications prior to marketing was signed into law in 1938 under the Federal Food, Drug, and Cosmetic Act; however, a significant risk management evolution has taken place since 1938. Additional federal rules, entitled the Food and Drug Administration Amendments Act, were established in 2007 and extended the government's oversight through the addition of a Risk Evaluation and Mitigation Strategy (REMS) for certain drugs. REMS is a mandated strategy to manage a known or potentially serious risk associated with a medication or biological product. Reasons for this extension of oversight were driven primarily by the FDA's movement to ensure that patients and providers are better informed of drug therapies and their specific benefits and risks prior to initiation. This article provides an historical perspective of the evolution of medication risk management policy and includes a review of REMS programs, an assessment of the positive and negative aspects of REMS, and provides suggestions for planning and measuring outcomes. In particular, this publication presents an overview of the evolution of the REMS program and its implications.

  19. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  20. Radon mitigation for the SuperCDMS SNOLAB dark matter experiment

    NASA Astrophysics Data System (ADS)

    Street, J.; Bunker, R.; Miller, E. H.; Schnee, R. W.; Snyder, S.; So, J.

    2018-01-01

    A potential background for the SuperCDMS SNOLAB dark matter experiment is from radon daughters that have plated out onto detector surfaces. To reach desired backgrounds, understanding plate-out rates during detector fabrication as well as mitigating radon in surrounding air is critical. A radon mitigated cleanroom planned at SNOLAB builds upon a system commissioned at the South Dakota School of Mines & Technology (SD Mines). The ultra-low radon cleanroom at SD Mines has air supplied by a vacuum-swing-adsorption radon mitigation system that has achieved >1000× reduction for a cleanroom activity consistent with zero and <0.067 Bq m-3 at 90% confidence. Our simulation of this system, validated against calibration data, provides opportunity for increased understanding and optimization for this and future systems.

  1. Public Response to Community Mitigation Measures for Pandemic Influenza

    PubMed Central

    Koonin, Lisa M.; Benson, John M.; Cetron, Martin S.; Pollard, William E.; Mitchell, Elizabeth W.; Weldon, Kathleen J.; Herrmann, Melissa J.

    2008-01-01

    We report the results of a national survey conducted to help public health officials understand the public’s response to community mitigation interventions for a severe outbreak of pandemic influenza. Survey results suggest that if community mitigation measures are instituted, most respondents would comply with recommendations but would be challenged to do so if their income or job were severely compromised. The results also indicate that community mitigation measures could cause problems for persons with lower incomes and for racial and ethnic minorities. Twenty-four percent of respondents said that they would not have anyone available to take care of them if they became sick with pandemic influenza. Given these results, planning and public engagement will be needed to encourage the public to be prepared. PMID:18439361

  2. The Hitchhiker's Guide to I&T

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    1999-01-01

    With over two dozen missions since the first in 1986, the Hitchhiker project has a reputation for providing quick-reaction, low-cost flight services for Shuttle Small Payloads Project (SSPP) customers. Despite the successes, several potential improvements in customer payload integration and test (I&T) deserve consideration. This paper presents suggestions to Hitchhiker customers on how to help make the I&T process run smoother. Included are: customer requirements and interface definition, pre-integration test and evaluation, configuration management, I&T overview and planning, problem mitigation, and organizational communication. In this era of limited flight opportunities and new ISO-based requirements, issues such as these have become more important than ever.

  3. SUV Rollover Test

    NASA Technical Reports Server (NTRS)

    Chambers, William V.

    2004-01-01

    The National Highway Traffic Safety Administration (NHTSA) approached NASA to evaluate vehicle rollover resistance using the High Capacity Centrifuge Facility. Testing was planned for six different sport utility vehicles. Previous methods for simulating the rollover conditions were considered to be not indicative of the true driving conditions. A more realistic gradual application of side loading could be achieved by using a centrifuge facility. A unique load measuring lower support system was designed to measure tire loading on the inboard tires and to indicate tire liftoff. This lower support system was designed to more closely emulate the actual rollover conditions. Additional design features were provided to mitigate potential safety hazards.

  4. U.S. Geological Survey toxic Waste-Groundwater Contamination Program, fiscal year 1985

    USGS Publications Warehouse

    Ragone, S.E.

    1986-01-01

    In fiscal year 1982, the U S Geological Survey began an interdisciplinary research thrust entitled Toxic Waste-Groundwater Contamination Program The objective of the thrust was to provide earth sciences information necessary to evaluate and mitigate existing groundwater contamination problems resulting from the planned or inadvertant disposal of wastes and from certain land-use practices, and to improve future waste disposal and land-use practices The program supports process-oriented and interdisciplinary field research, and regional groundwater quality studies This article provides an overview of the current (Fiscal Year 1985) activities of the Toxic Waste Program ?? 1986 Springer-Verlag New York Inc.

  5. Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements

    USDA-ARS?s Scientific Manuscript database

    Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...

  6. 77 FR 36287 - Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander, Calaveras...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ...-FXES11120800000F2-123-F2] Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander... animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate the...

  7. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... procedures have been followed, and (3) The land management agency is willing to assume long-term... appropriations. The Commission will provide the Secretary's Representative with both long range and annual... plan in terms of meeting Section 8 mitigation obligations as directed by the Act. (iv) The Commission...

  8. 78 FR 57651 - Habitat Conservation Plan for the Community of Los Osos, San Luis Obispo County, CA; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ..., management, maintenance, and monitoring of conservation lands used to mitigate the effects of the other.... The LOHCP is a comprehensive plan designed to provide long-term conservation and management of... Maintenance: Public and private utility company activities to operate and maintain, including repair and...

  9. Messy Design: Organic Planning for Blended Learning

    ERIC Educational Resources Information Center

    Rankin, Andrea; Luzeckyj, Ann; Haggis, Jane; Gare, Callum

    2016-01-01

    In this paper we argue that a messy design process does not mitigate against sharing and transfer of artefacts across educational domains. In fact, such a process can aid in developing a model for learning and teaching that is reusable and authentic. We describe the planning and design of an integrated and interactive blended learning environment…

  10. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  11. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...

  12. National Infrastructure Protection Plan: Partnering to Enhance Protection and Resiliency

    ERIC Educational Resources Information Center

    US Department of Homeland Security, 2009

    2009-01-01

    The overarching goal of the National Infrastructure Protection Plan (NIPP) is to build a safer, more secure, and more resilient America by preventing, deterring, neutralizing, or mitigating the effects of deliberate efforts by terrorists to destroy, incapacitate, or exploit elements of our Nation's critical infrastructure and key resources (CIKR)…

  13. The Effect of Mitigation Policy on Regional Climate Impacts on the U.S. Electric Sector

    NASA Astrophysics Data System (ADS)

    Cohen, S. M.; Sun, Y.; Strzepek, K.; McFarland, J.; Boehlert, B.; Fant, C.

    2017-12-01

    Climate change can influence the U.S. electricity sector in many ways, the nature of which can be shaped by energy and environmental policy choices. Changing temperatures affect electricity demand largely through heating and cooling needs, and temperatures also affect generation and transmission system performance. Altered precipitation patterns affect the regional and seasonal distribution of surface water runoff, which changes hydropower operation and thermal cooling water availability. The extent to which these stimuli influence U.S. power sector operation and planning will depend to some extent on whether or not proactive policies are enacted to mitigate these impacts. Mitigation policies such as CO2 emissions limits or technology restrictions can change the makeup of the electricity system while reducing the extent of climate change itself. We use the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS), a U.S. electric sector capacity expansion model, to explore electric sector evolution through 2050 under alternative climate and policy assumptions. The model endogenously represents climate impacts on load, power system performance, cooling water availability, and hydropower, allowing internally consistent system responses to climate change along with projected technology, market, and policy conditions. We compare climate impacts across 5 global circulation models for a 8.5 W/m2 representative concentration pathway (RCP) without a climate mitigation policy and a 4.5 W/m2 RCP with climate mitigation. Climate drivers affect the capacity and generation mix at the national and regional levels, with relative growth of wind, solar, and natural gas-based technologies depending on local electricity system characteristics. These differences affect regional economic impacts, measured here as changes to electricity price and system costs. Mitigation policy reduces the economic and system impacts of climate change largely by moderating temperature-induced load but also by lessening water- and temperature-based performance constraints. Policy impacts are nuanced and region-specific, and this analysis underscores the importance of climate mitigation policy to regional electricity system planning decisions.

  14. Human casualties in earthquakes: Modelling and mitigation

    USGS Publications Warehouse

    Spence, R.J.S.; So, E.K.M.

    2011-01-01

    Earthquake risk modelling is needed for the planning of post-event emergency operations, for the development of insurance schemes, for the planning of mitigation measures in the existing building stock, and for the development of appropriate building regulations; in all of these applications estimates of casualty numbers are essential. But there are many questions about casualty estimation which are still poorly understood. These questions relate to the causes and nature of the injuries and deaths, and the extent to which they can be quantified. This paper looks at the evidence on these questions from recent studies. It then reviews casualty estimation models available, and finally compares the performance of some casualty models in making rapid post-event casualty estimates in recent earthquakes.

  15. Optimizing spacecraft design - optimization engine development : progress and plans

    NASA Technical Reports Server (NTRS)

    Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim

    2003-01-01

    At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

  16. Mitigation for one & all: An integrated framework for mitigation of development impacts on biodiversity and ecosystem services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tallis, Heather, E-mail: htallis@tnc.org; Kennedy, Christina M., E-mail: ckennedy@tnc.org; Ruckelshaus, Mary

    Emerging development policies and lending standards call for consideration of ecosystem services when mitigating impacts from development, yet little guidance exists to inform this process. Here we propose a comprehensive framework for advancing both biodiversity and ecosystem service mitigation. We have clarified a means for choosing representative ecosystem service targets alongside biodiversity targets, identified servicesheds as a useful spatial unit for assessing ecosystem service avoidance, impact, and offset options, and discuss methods for consistent calculation of biodiversity and ecosystem service mitigation ratios. We emphasize the need to move away from area- and habitat-based assessment methods for both biodiversity and ecosystemmore » services towards functional assessments at landscape or seascape scales. Such comprehensive assessments more accurately reflect cumulative impacts and variation in environmental quality, social needs and value preferences. The integrated framework builds on the experience of biodiversity mitigation while addressing the unique opportunities and challenges presented by ecosystem service mitigation. These advances contribute to growing potential for economic development planning and execution that will minimize impacts on nature and maximize human wellbeing. - Highlights: • This is the first framework for biodiversity and ecosystem service mitigation. • Functional, landscape scale assessments are ideal for avoidance and offsets. • Servicesheds define the appropriate spatial extent for ecosystem service mitigation. • Mitigation ratios should be calculated consistently and based on standard factors. • Our framework meets the needs of integrated mitigation assessment requirements.« less

  17. Contingency Operations of Americas Next Moon Rocket, Ares V

    NASA Technical Reports Server (NTRS)

    Jaap, John; Richardson, Lea

    2010-01-01

    America has begun the development of a new space vehicle system which will enable humans to return to the moon and reach even farther destinations. The system is called Constellation: it has 2 earth-launch vehicles, Ares I and Ares V; a crew module, Orion; and a lander, Altair with descent and ascent stages. Ares V will launch an Earth Departure Stage (EDS) and Altair into low earth orbit. Ares I will launch the Orion crew module into low earth orbit where it will rendezvous and dock with the Altair and EDS "stack". After rendezvous, the stack will contain four complete rocket systems, each capable of independent operations. Of course this multiplicity of vehicles provides a multiplicity of opportunities for off-nominal behavior and multiple mitigation options for each. Contingency operations are complicated by the issues of crew safety and the possibility of debris from the very large components impacting the ground. This paper examines contingency operations of the EDS in low earth orbit, during the boost to translunar orbit, and after the translunar boost. Contingency operations under these conditions have not been a consideration since the Apollo era and analysis of the possible contingencies and mitigations will take some time to evolve. Since the vehicle has not been designed, much less built, it is not possible to evaluate contingencies from a root-cause basis or from a probability basis; rather they are discussed at an effects level (such as the reaction control system is consuming propellant at a high rate). Mitigations for the contingencies are based on the severity of the off-nominal condition, the time of occurrence, recovery options, options for alternate missions, crew safety, evaluation of the condition (forensics) and future prevention. Some proposed mitigations reflect innovation in thinking and make use of the multiplicity of on-orbit resources including the crew; example: Orion could do a "fly around" to allow the crew to determine the condition and cause of a partially separated payload shroud. Other mitigations are really alternate missions; example, an engine out on during ascent resulted in insufficient propellant for the lunar mission, but the on-orbit vehicle stack is otherwise perfect and can pursue an alternate mission, such as a high ballistic trajectory to test the high-speed atmospheric reentry of Orion. Evaluation and presentation of contingency operations at this early stage of the development of the Ares V rocket will improve the design of the vehicle and lay the groundwork for the exhaustive contingency planning which must be done after the vehicle is built as preparations for operations.

  18. [Evaluation indices of greenhouse gas mitigation technologies in cropland ecosystem].

    PubMed

    Li, Jian-zheng; Wang, Ying-chun; Wang, Li-gang; Li, Hu; Qiu, Jian-jun; Wang, Dao-long

    2015-01-01

    In spite of the increasing studies on greenhouse gas (GHG) emissions mitigation technologies, there is still a lack of systematic indices for evaluation of their overall impacts in croplands. In this study, we collected all the indices relating to greenhouse gas emissions and analyzed each index following the principles of representativeness, objectivity, completeness, dominance and operability. Finally, we proposed evaluation indices for mitigation technologies based on the current situation of China. Crop yield per unit area was proposed as a constrained index, and greenhouse gas emissions intensity, defined as GHG emissions per unit of produced yield, was proposed as comprehensive index to evaluate the greenhouse effect of various croplands mitigation technologies. Calculation of GHG emissions intensity involved yield, change of soil organic carbon, direct N2O emissions, paddy CH4 emissions and direct and indirect emissions from inputs into croplands. By following these evaluation indices, the greenhouse effect of the technologies could be well evaluated, which could provide scientific basis for their further adoption.

  19. Habitat Evaluation Procedures (HEP) Report : Malheur River Wildlife Mitigation, 2000-2002 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzalez, Daniel; Wenick, Jess

    The development of hydropower systems within the Columbia and Snake River basins has affected a tremendous amount of fish and wildlife species. The dams have played a major role in the rapid extinction of anadromous runs of salmon and steelhead as well as other native salmonids. Inundation of these dams and the construction of reservoirs for irrigation have also severely impacted wildlife species. In some cases, fluctuating water levels caused by dam and reservoir operations have created barren vegetation zones that expose wildlife to predation and a reduction in recruitment. In association with hydropower activities, secondary impacts have also challengedmore » and highly impacted a majority of wildlife species. The construction of roads, facilities, urban development, channelization, and diversions of streams and rivers often have negative long-term effects on fish, wildlife, and vegetation. In response to these concerns, the United States Congress passed the Pacific Electric Power Planning Conservation Act (Act) in 1980. The Act authorized four states (Idaho, Montana, Oregon and Washington) and 13 Indian Tribes (including the Burns Paiute Tribe) to create the Northwest Power Planning Council (Council). The role of the Council is to prepare a program in conjunction with several participants that protects, mitigates and enhances affected species within the Columbia River Basin and its tributaries. The Council's program, known as the Columbia River Basin's Fish and Wildlife Program (Program), has evolved over the years into a basin-wide approach that incorporates management plans for 52 subbasins. The Program includes a public involvement component that requires Program participants to provide the public with meaningful opportunities to comment on specific management proposals. Participants in this Program include the region's fish and wildlife agencies, Indian tribes, the public and an 11-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP). Program participants are responsible for creating management plans for each of the 52 subbasins. Upon approval by the Council, the management plan is then incorporated into the Program. In 1998, the Tribe submitted two land acquisition proposals for funding through Bonneville's Wildlife Mitigation Program, the Logan Valley and Malheur River Wildlife Mitigation Projects. After several months of rigorous scrutiny and defense of its project presentations, the Tribe was awarded both acquisitions. In February of 2000, the Tribe and BPA entered into a Memorandum of Agreement (MOA) to fund the acquisition and management of Logan Valley and the Malheur River Projects. In April and November of 2000, the Tribe acquired the Logan Valley property (Project) and the Malheur River Wildlife Mitigation Project, respectively. The MOA requires the Tribe to dedicate the Project to wildlife habitat protection. Project management must be consistent with the term and conditions of the MOA and a site-specific management plan (Plan) that is to be prepared by the Tribe. The Malheur River Wildlife Mitigation Project (Denny Jones Ranch) allows the Tribe to manage 6,385 acres of meadow, wetland, and sagebrush steppe habitats along the Malheur River. The deeded property includes seven miles of the Malheur River, the largest private landholding along this waterway between Riverside and Harper. The property came with approximately 938 acres of senior water rights and 38,377 acres of federal and state grazing allotments. The project will benefit a diverse population of fish, wildlife, and plant species. Objectives include reviving and improving critical habitat for fish and wildlife populations, controlling/ eradicating weed populations, improving water quality, maintaining Bureau of Land Management (BLM) allotments, and preserving cultural resources. Before the Tribe acquired the project site, a combination of high levels of cattle stocking rates, management strategy, and a disruption of natural disturbance regimes compromised the property's ability to provide quality habitat to wildlife species found in the area. As a result, rangeland condition was depleted, exotic annual grasses and other noxious weeds began to invade native plant communities and many riparian areas were generally degraded. Native meadow communities were also leveled and planted with introduced species shortly after settlement and wildlife use and historic home ranges for migratory species have been severely altered. Current management is actively seeking to enhance the ability of the site's plant communities to support resident fauna that are known to have thrived in the area prior to settlement. The Tribe is utilizing a baseline approach to its overall land management by recognizing the importance of plant succession in achieving wildlife goal.« less

  20. Directional Gila River crossing saves construction, mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saylor, L.A.

    1994-12-01

    Directional drilled river crossing technology gained a new convert this fall as El Paso Natural Gas Co. (EPNG) replaced a washed out 10 3/4-in. line that crossed the Gila River and two irrigation canals near Yuma, Ariz. The 1,650-ft bore, the company's first drilled river crossing, saved both construction costs and environmental reporting and mitigation expenses. This paper reviews the planning, engineering, and equipment used to install this river pipeline crossing.

  1. Land-Use Planning in the Chaco Plain (Burruyacú, Argentina): Part 2: Generating a Consensus Plan to Mitigate Land-Use Conflicts and Minimize Land Degradation

    NASA Astrophysics Data System (ADS)

    Recatalá Boix, Luis; Zinck, Joseph Alfred

    2008-08-01

    The Burruyacú district (Tucumán province, Northwest Argentina) has been traditionally an area with rural activities based on the exploitation of the Chaco forest for timber and livestock browsing. Since the 1960s, local institutions started promoting soybean due to favorable land conditions and good market prices. Soybean extension, as from the 1970s, has resulted in important reduction of the Chaco forest and also caused physical soil degradation, especially soil compaction and erosion. A land-use-planning exercise was carried out using the Land-Use Planning and Information System (LUPIS) as a spatial decision support system. LUPIS facilitates the generation of alternative land-use plans by adjusting the relative importance attributed by multiple stakeholders to preference and avoidance policies. The system leads to the allocation of competing land uses to land map units in accordance with their preferred resource requirements, conditional upon the resource base of the area and the stakeholders’ demands. After generating a land use plan for each stakeholder category identified in the study area, including commercial farmers, conservative/conventional farmers, and conservationists, a consensus plan was established to address the land-use conflicts between mechanized agriculture, traditional agriculture and forest conservation, and to mitigate soil degradation caused by extensive dry-farming. Although the planning exercise did not directly involve the stakeholders, the results are sufficiently practical and realistic to suggest that the approach could be extended to the entire Chaco plain region.

  2. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  3. Andrea Watson | NREL

    Science.gov Websites

    energy solutions for emission mitigation, international climate change strategies, and renewable energy technical decision making. Andrea's expertise lies in strategic planning, change strategies, and decision

  4. 7 CFR 12.30 - NRCS responsibilities regarding wetlands.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... approve wetland determinations, delineations and certifications, functional assessments, mitigation plans... production of food, fiber, or horticultural crops, a certification made under this section will remain valid...

  5. Jennifer Daw | NREL

    Science.gov Websites

    , energy and water audits, greenhouse gas mitigation, energy-water-food nexus analysis and strategy planning, and asset management. Research Interests Energy-water-food nexus Sustainable development and

  6. Reducing emissions from agriculture to meet the 2 °C target.

    PubMed

    Wollenberg, Eva; Richards, Meryl; Smith, Pete; Havlík, Petr; Obersteiner, Michael; Tubiello, Francesco N; Herold, Martin; Gerber, Pierre; Carter, Sarah; Reisinger, Andrew; van Vuuren, Detlef P; Dickie, Amy; Neufeldt, Henry; Sander, Björn O; Wassmann, Reiner; Sommer, Rolf; Amonette, James E; Falcucci, Alessandra; Herrero, Mario; Opio, Carolyn; Roman-Cuesta, Rosa Maria; Stehfest, Elke; Westhoek, Henk; Ortiz-Monasterio, Ivan; Sapkota, Tek; Rufino, Mariana C; Thornton, Philip K; Verchot, Louis; West, Paul C; Soussana, Jean-François; Baedeker, Tobias; Sadler, Marc; Vermeulen, Sonja; Campbell, Bruce M

    2016-12-01

    More than 100 countries pledged to reduce agricultural greenhouse gas (GHG) emissions in the 2015 Paris Agreement of the United Nations Framework Convention on Climate Change. Yet technical information about how much mitigation is needed in the sector vs. how much is feasible remains poor. We identify a preliminary global target for reducing emissions from agriculture of ~1 GtCO 2 e yr -1 by 2030 to limit warming in 2100 to 2 °C above pre-industrial levels. Yet plausible agricultural development pathways with mitigation cobenefits deliver only 21-40% of needed mitigation. The target indicates that more transformative technical and policy options will be needed, such as methane inhibitors and finance for new practices. A more comprehensive target for the 2 °C limit should be developed to include soil carbon and agriculture-related mitigation options. Excluding agricultural emissions from mitigation targets and plans will increase the cost of mitigation in other sectors or reduce the feasibility of meeting the 2 °C limit. © 2016 The Authors Global Change Biology Published by John Wiley & Sons Ltd.

  7. Effects of climate and land cover on hydrology in the southeastern U.S.: Potential impacts on watershed planning

    USGS Publications Warehouse

    LaFontaine, Jacob H.; Hay, Lauren E.; Viger, Roland; Regan, R. Steve; Markstrom, Steven

    2015-01-01

    The hydrologic response to statistically downscaled general circulation model simulations of daily surface climate and land cover through 2099 was assessed for the Apalachicola-Chattahoochee-Flint River Basin located in the southeastern United States. Projections of climate, urbanization, vegetation, and surface-depression storage capacity were used as inputs to the Precipitation-Runoff Modeling System to simulate projected impacts on hydrologic response. Surface runoff substantially increased when land cover change was applied. However, once the surface depression storage was added to mitigate the land cover change and increases of surface runoff (due to urbanization), the groundwater flow component then increased. For hydrologic studies that include projections of land cover change (urbanization in particular), any analysis of runoff beyond the change in total runoff should include effects of stormwater management practices as these features affect flow timing and magnitude and may be useful in mitigating land cover change impacts on streamflow. Potential changes in water availability and how biota may respond to changes in flow regime in response to climate and land cover change may prove challenging for managers attempting to balance the needs of future development and the environment. However, these models are still useful for assessing the relative impacts of climate and land cover change and for evaluating tradeoffs when managing to mitigate different stressors.

  8. Evaluating the Suitability of Management Strategies of Pure Norway Spruce Forests in the Black Forest Area of Southwest Germany for Adaptation to or Mitigation of Climate Change

    NASA Astrophysics Data System (ADS)

    Yousefpour, Rasoul; Hanewinkel, Marc; Le Moguédec, Gilles

    2010-02-01

    The study deals with the problem of evaluating management strategies for pure stands of Norway spruce ( Picea abies Karst) to balance adaptation to and mitigation of climate change, taking into account multiple objectives of a forest owner. A simulation and optimization approach was used to evaluate the management of a 1000 ha model Age-Class forest, representing the age-class distribution of an area of 66,000 ha of pure Norway spruce forests in the Black Forest region of Southwest Germany. Eight silvicultural scenarios comprising five forest conversion schemes which were interpreted as “adaptation” strategies which aims at increasing the proportion of Beech, that is expected to better cope with climate change than the existing Norway spruce, and three conventional strategies including a “Do-nothing” alternative classified as “mitigation”, trying to keep rather higher levels of growing stock of spruce, were simulated using the empirical growth simulator BWINPro-S. A linear programming approach was adapted to simultaneously maximize the net present values of carbon sequestration and timber production subject to the two constraints of wood even flow and partial protection of the oldest (nature protection). The optimized plan, with the global utility of 11,687 €/ha in forty years, allocated a combination of silvicultural scenarios to the entire forest area. Overall, strategies classified as “mitigation” were favored, while strategies falling into the “adaptation”-category were limited to the youngest age-classes in the optimal solution. Carbon sequestration of the “Do-nothing” alternative was between 1.72 and 1.85 million tons higher than the other alternatives for the entire forest area while the differences between the adaptation and mitigation approaches were approximately 133,000 tons. Sensitivity analysis showed that a carbon price of 21 €/ t is the threshold at which carbon sequestration is promoted, while an interest rate of above 2% would decrease the amount of carbon.

  9. Isla Hispaniola: A trans-boundary flood risk mitigation plan

    NASA Astrophysics Data System (ADS)

    Brandimarte, Luigia; Brath, Armando; Castellarin, Attilio; Baldassarre, Giuliano Di

    It is sadly known that over the past decades Isla Hispaniola (Haiti and the Dominican Republic) has been exposed to the devastating passage of several hurricanes and tropical storms. Territories that are economically weak and extremely poor in terms of natural resources have been shaken by severe flood events that caused the loss of thousands of human lives, displacement of people and damage to the environment. On May 24th 2004, the flooding of the trans-boundary river Soliette killed over 1000 Haitian and Dominican people, wiping out villages and leaving behind desolation and poverty. After this catastrophic flood event, the General Direction for Development and Cooperation of the Italian Department of Foreign Affairs funded through the Istituto Italo-Latino Americano (IILA, www.iila.org) an international cooperation initiative (ICI), coordinated and directed by the University of Bologna. The ICI involved Haitian and Dominican institutions and was twofold: (a) institutional capacity building on flood risk management and mitigation measures and policies; (b) hydrological and hydraulic analysis of the May 2004 flood event aimed at formulating a suitable and affordable flood risk mitigation plan, consisting of structural and non-structural measures.

  10. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less

  11. Modelling Multi Hazard Mapping in Semarang City Using GIS-Fuzzy Method

    NASA Astrophysics Data System (ADS)

    Nugraha, A. L.; Awaluddin, M.; Sasmito, B.

    2018-02-01

    One important aspect of disaster mitigation planning is hazard mapping. Hazard mapping can provide spatial information on the distribution of locations that are threatened by disaster. Semarang City as the capital of Central Java Province is one of the cities with high natural disaster intensity. Frequent natural disasters Semarang city is tidal flood, floods, landslides, and droughts. Therefore, Semarang City needs spatial information by doing multi hazard mapping to support disaster mitigation planning in Semarang City. Multi Hazards map modelling can be derived from parameters such as slope maps, rainfall, land use, and soil types. This modelling is done by using GIS method with scoring and overlay technique. However, the accuracy of modelling would be better if the GIS method is combined with Fuzzy Logic techniques to provide a good classification in determining disaster threats. The Fuzzy-GIS method will build a multi hazards map of Semarang city can deliver results with good accuracy and with appropriate threat class spread so as to provide disaster information for disaster mitigation planning of Semarang city. from the multi-hazard modelling using GIS-Fuzzy can be known type of membership that has a good accuracy is the type of membership Gauss with RMSE of 0.404 the smallest of the other membership and VAF value of 72.909% of the largest of the other membership.

  12. THERMAL EVALUATION OF CONTAMINATED LIQUID ONTO CELL FLOORS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NOEMAIL), J

    2009-05-04

    For the Salt Disposition Integration Project (SDIP), postulated events in the new Salt Waste Processing Facility (SWPF) can result in spilling liquids that contain Cs-137 and organics onto cell floors. The parameters of concern are the maximum temperature of the fluid following a spill and the time required for the maximum fluid temperature to be reached. Control volume models of the various process cells have been developed using standard conduction and natural convection relationships. The calculations are performed using the Mathcad modeling software. The results are being used in Consolidated Hazards Analysis Planning (CHAP) to determine the controls that maymore » be needed to mitigate the potential impact of liquids containing Cs-137 and flammable organics that spill onto cell floors. Model development techniques and the ease of making model changes within the Mathcad environment are discussed. The results indicate that certain fluid spills result in overheating of the fluid, but the times to reach steady-state are several hundred hours. The long times allow time for spill clean up without the use of expensive mitigation controls.« less

  13. Dust Storm Feature Identification and Tracking from 4D Simulation Data

    NASA Astrophysics Data System (ADS)

    Yu, M.; Yang, C. P.

    2016-12-01

    Dust storms cause significant damage to health, property and the environment worldwide every year. To help mitigate the damage, dust forecasting models simulate and predict upcoming dust events, providing valuable information to scientists, decision makers, and the public. Normally, the model simulations are conducted in four-dimensions (i.e., latitude, longitude, elevation and time) and represent three-dimensional (3D), spatial heterogeneous features of the storm and its evolution over space and time. This research investigates and proposes an automatic multi-threshold, region-growing based identification algorithm to identify critical dust storm features, and track the evolution process of dust storm events through space and time. In addition, a spatiotemporal data model is proposed, which can support the characterization and representation of dust storm events and their dynamic patterns. Quantitative and qualitative evaluations for the algorithm are conducted to test the sensitivity, and capability of identify and track dust storm events. This study has the potential to assist a better early warning system for decision-makers and the public, thus making hazard mitigation plans more effective.

  14. Chapter 12 - Mapping wildland fuel across large regions for the LANDFIRE Prototype Project

    Treesearch

    Robert E. Keane; Tracey Frescino; Matthew C. Reeves; Jennifer L. Long

    2006-01-01

    The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required that the entire array of wildland fuel characteristics be mapped to provide fire and landscape managers with consistent baseline geo-spatial information to plan projects for hazardous fuel mitigation and to improve public and firefighter safety. Fuel...

  15. 50 CFR 18.114 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...

  16. 50 CFR 18.114 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...

  17. 50 CFR 18.114 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...

  18. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  19. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  20. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  1. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  2. Final Range Wide Environmental Impact Statement

    DTIC Science & Technology

    2001-07-01

    military presence at YPG protects natural resources by limiting access and activities, preventing or mitigating many impacts. The military presence in the...Pollution Prevention Plan; and Spill Prevention , Control and Countermeasures Plan (SPCCP). Environmental programs are responsible for...Act (CAA), PL 88-206 as amended, establishes National Ambient Air Quality Standards (NAAQS) for the control of criteria air pollutants to prevent

  3. Liaison Officer Toolkit

    DTIC Science & Technology

    2010-01-01

    Planning Chapters Chapter 5 provides DSCA planning factors for response to all hazard events. Chapter 6 is a review of safety and operational/composite...risk management processes. Chapters 7 through 11 contain the Concepts of Operation (CONOPS) and details five natural hazards /disasters and the...Restoring critical public services and facilities through temporary measures • Identifying hazard mitigation opportunities 3.3.1.5 Rehabilitation

  4. Social science to improve fuels management: a synthesis of research on collaboration.

    Treesearch

    Victoria Sturtevant; Margaret Ann Moote; Pamela Jakes; Anthony S. Cheng

    2005-01-01

    A series of syntheses were commissioned by the USDA Forest Service to aid in fuels mitigation project planning. This synthesis focuses on collaboration research, and offers knowledge and tools to improve collaboration in the planning and implementation of wildland fire and fuels management projects. It covers a variety of topics including benefits of collaboration,...

  5. Steps for Developing a School Emergency Management Plan. Helpful Hints for School Emergency Management. Volume 2, Issue 1

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    The U.S. Department of Education's Office of Safe and Drug-Free Schools strongly encourages schools and school districts to develop emergency management plans within the context of the four phases of emergency management: prevention, mitigation, preparedness, response and recovery. In addition, schools should collaborate closely with police, fire…

  6. Planning for a Violent Intruder Event: The School Nurse's Role.

    PubMed

    Selekman, Janice; Melvin, Joseph

    2017-05-01

    School shootings occur too frequently and often with devastating results. The key to prevention and mitigation of these events is to have a plan that is simple, up-to-date, disseminated, and practiced. This article discusses the steps that school nurses can take to work with school administration to prepare themselves, their staff, and their students.

  7. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of existing and future buildings, infrastructure, and critical facilities located in the identified... effects of each hazard, with particular emphasis on new and existing buildings and infrastructure. (iii...

  8. Cove Mines Fact Sheets

    EPA Pesticide Factsheets

    This factsheet contains information about planned construction activities to mitigate surface erosion at the former transfer area located in the Cove/Red Valley Chapter of the Navajo Nation in eastern Arizona.

  9. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam; Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from the McNary Dam, 1994-1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beiningen, Kirk T.

    The author reports on progress from April 1994 through March 1995 of research on white sturgeon in the lower Columbia River. The study began in July 1986 and is a cooperative effort of federal, state and tribal fisheries entities to determine the (1) the status and habitat requirements, and (2) the effects of mitigative measures on productivity of white sturgeon populations in the lower Columbia River. This report describes activities conducted during the third year of this contract's second phase. Information was collected, analyzed, and evaluated on sub-adult and adult life histories, population dynamics, quantity and quality of habitat, andmore » production enhancement strategies. The report is divided into sections that evaluate success of developing and implementing a management plan for white sturgeon; evaluate growth, mortality, and contributions to fisheries of juvenile white sturgeon transplanted from areas downstream; describe the life history and population dynamics of sub-adult a nd adult white sturgeon; define habitat requirements for spawning and rearing of white sturgeon and quantify the extent of habitat available; describe reproductive and early life history characteristics of white sturgeon; and quantify physical habitat used by spawning and rearing white sturgeon in the free-flowing portion of the Columbia River.« less

  10. Building the evidence base for REDD+: Study design and methods for evaluating the impacts of conservation interventions on local well-being

    PubMed Central

    Sills, Erin O.; de Sassi, Claudio; Jagger, Pamela; Lawlor, Kathleen; Miteva, Daniela A.; Pattanayak, Subhrendu K.; Sunderlin, William D.

    2018-01-01

    Climate change mitigation in developing countries is increasingly expected to generate co-benefits that help meet sustainable development goals. This has been an expectation and a hotly contested issue in REDD+ (reducing emissions from deforestation and forest degradation) since its inception. While the core purpose of REDD+ is to reduce carbon emissions, its legitimacy and success also depend on its impacts on local well-being. To effectively safeguard against negative impacts, we need to know whether and which well-being outcomes can be attributed to REDD+. Yet, distinguishing the effects of choosing particular areas for REDD+ from the effects of the interventions themselves remains a challenge. The Global Comparative Study (GCS) on REDD+ employed a quasi-experimental before-after-control-intervention (BACI) study design to address this challenge and evaluate the impacts of 16 REDD+ pilots across the tropics. We find that the GCS approach allows identification of control groups that represent the counterfactual, thereby permitting attribution of outcomes to REDD+. The GCS experience belies many of the common critiques of the BACI design, especially concerns about collecting baseline data on control groups. Our findings encourage and validate the early planning and up-front investments required to evaluate the local impacts of global climate change mitigation efforts with confidence. The stakes are high, both for the global environment and for local populations directly affected by those efforts. The standards for evidence should be concomitantly high. PMID:29681690

  11. Building the evidence base for REDD+: Study design and methods for evaluating the impacts of conservation interventions on local well-being.

    PubMed

    Sills, Erin O; de Sassi, Claudio; Jagger, Pamela; Lawlor, Kathleen; Miteva, Daniela A; Pattanayak, Subhrendu K; Sunderlin, William D

    2017-03-01

    Climate change mitigation in developing countries is increasingly expected to generate co-benefits that help meet sustainable development goals. This has been an expectation and a hotly contested issue in REDD+ (reducing emissions from deforestation and forest degradation) since its inception. While the core purpose of REDD+ is to reduce carbon emissions, its legitimacy and success also depend on its impacts on local well-being. To effectively safeguard against negative impacts, we need to know whether and which well-being outcomes can be attributed to REDD+. Yet, distinguishing the effects of choosing particular areas for REDD+ from the effects of the interventions themselves remains a challenge. The Global Comparative Study (GCS) on REDD+ employed a quasi-experimental before-after-control-intervention (BACI) study design to address this challenge and evaluate the impacts of 16 REDD+ pilots across the tropics. We find that the GCS approach allows identification of control groups that represent the counterfactual, thereby permitting attribution of outcomes to REDD+. The GCS experience belies many of the common critiques of the BACI design, especially concerns about collecting baseline data on control groups. Our findings encourage and validate the early planning and up-front investments required to evaluate the local impacts of global climate change mitigation efforts with confidence. The stakes are high, both for the global environment and for local populations directly affected by those efforts. The standards for evidence should be concomitantly high.

  12. SU-E-T-07: 4DCT Robust Optimization for Esophageal Cancer Using Intensity Modulated Proton Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liao, L; Department of Industrial Engineering, University of Houston, Houston, TX; Yu, J

    2015-06-15

    Purpose: To develop a 4DCT robust optimization method to reduce the dosimetric impact from respiratory motion in intensity modulated proton therapy (IMPT) for esophageal cancer. Methods: Four esophageal cancer patients were selected for this study. The different phases of CT from a set of 4DCT were incorporated into the worst-case dose distribution robust optimization algorithm. 4DCT robust treatment plans were designed and compared with the conventional non-robust plans. Result doses were calculated on the average and maximum inhale/exhale phases of 4DCT. Dose volume histogram (DVH) band graphic and ΔD95%, ΔD98%, ΔD5%, ΔD2% of CTV between different phases were used tomore » evaluate the robustness of the plans. Results: Compare to the IMPT plans optimized using conventional methods, the 4DCT robust IMPT plans can achieve the same quality in nominal cases, while yield a better robustness to breathing motion. The mean ΔD95%, ΔD98%, ΔD5% and ΔD2% of CTV are 6%, 3.2%, 0.9% and 1% for the robustly optimized plans vs. 16.2%, 11.8%, 1.6% and 3.3% from the conventional non-robust plans. Conclusion: A 4DCT robust optimization method was proposed for esophageal cancer using IMPT. We demonstrate that the 4DCT robust optimization can mitigate the dose deviation caused by the diaphragm motion.« less

  13. Accidental spills at sea--risk, impact, mitigation and the need for co-ordinated post-incident monitoring.

    PubMed

    Kirby, Mark F; Law, Robin J

    2010-06-01

    A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.

  14. Vulnerability of port and harbor communities to earthquake and tsunami hazards: The use of GIS in community hazard planning

    USGS Publications Warehouse

    Wood, Nathan J.; Good, James W.

    2004-01-01

    AbstractEarthquakes and tsunamis pose significant threats to Pacific Northwest coastal port and harbor communities. Developing holistic mitigation and preparedness strategies to reduce the potential for loss of life and property damage requires community-wide vulnerability assessments that transcend traditional site-specific analyses. The ability of a geographic information system (GIS) to integrate natural, socioeconomic, and hazards information makes it an ideal assessment tool to support community hazard planning efforts. This article summarizes how GIS was used to assess the vulnerability of an Oregon port and harbor community to earthquake and tsunami hazards, as part of a larger risk-reduction planning initiative. The primary purposes of the GIS were to highlight community vulnerability issues and to identify areas that both are susceptible to hazards and contain valued port and harbor community resources. Results of the GIS analyses can help decision makers with limited mitigation resources set priorities for increasing community resiliency to natural hazards.

  15. Commercial Aircraft Integrated Vehicle Health Management Study

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.

    2010-01-01

    Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.

  16. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purposemore » of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.« less

  17. Case study: reconciling the quality and safety gap through strategic planning.

    PubMed

    Jeffs, Lianne; Merkley, Jane; Jeffrey, Jana; Ferris, Ella; Dusek, Janice; Hunter, Catherine

    2006-05-01

    An essential outcome of professional practice environments is the provision of high-quality, safe nursing care. To mitigate the quality and safety chasm, nursing leadership at St. Michael's Hospital undertook a strategic plan to enhance the nursing professional practice environment. This case study outlines the development of the strategic planning process: the driving forces (platform); key stakeholders (process and players); vision, guiding principles, strategic directions, framework for action and accountability (plan); lessons learned (pearls); and next steps to moving forward the vision, strategic directions and accountability mechanisms (passion and perseverance).

  18. Evaluation of Low-Cost Mitigation Measures Implemented to Improve Air Quality in Nursery and Primary Schools.

    PubMed

    Sá, Juliana P; Branco, Pedro T B S; Alvim-Ferraz, Maria C M; Martins, Fernando G; Sousa, Sofia I V

    2017-05-31

    Indoor air pollution mitigation measures are highly important due to the associated health impacts, especially on children, a risk group that spends significant time indoors. Thus, the main goal of the work here reported was the evaluation of mitigation measures implemented in nursery and primary schools to improve air quality. Continuous measurements of CO₂, CO, NO₂, O₃, CH₂O, total volatile organic compounds (VOC), PM₁, PM 2.5 , PM 10 , Total Suspended Particles (TSP) and radon, as well as temperature and relative humidity were performed in two campaigns, before and after the implementation of low-cost mitigation measures. Evaluation of those mitigation measures was performed through the comparison of the concentrations measured in both campaigns. Exceedances to the values set by the national legislation and World Health Organization (WHO) were found for PM 2.5 , PM 10 , CO₂ and CH₂O during both indoor air quality campaigns. Temperature and relative humidity values were also above the ranges recommended by American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE). In general, pollutant concentrations measured after the implementation of low-cost mitigation measures were significantly lower, mainly for CO₂. However, mitigation measures were not always sufficient to decrease the pollutants' concentrations till values considered safe to protect human health.

  19. Development of a simplified urban water balance model (WABILA).

    PubMed

    Henrichs, M; Langner, J; Uhl, M

    2016-01-01

    During the last decade, water sensitive urban design (WSUD) has become more and more accepted. However, there is not any simple tool or option available to evaluate the influence of these measures on the local water balance. To counteract the impact of new settlements, planners focus on mitigating increases in runoff through installation of infiltration systems. This leads to an increasing non-natural groundwater recharge and decreased evapotranspiration. Simple software tools which evaluate or simulate the effect of WSUD on the local water balance are still needed. The authors developed a tool named WABILA (Wasserbilanz) that could support planners for optimal WSUD. WABILA is an easy-to-use planning tool that is based on simplified regression functions for established measures and land covers. Results show that WSUD has to be site-specific, based on climate conditions and the natural water balance.

  20. Analysis of Traffic Conflicts in a Mixed-Airspace Evaluation of Airborne Separation Assurance

    NASA Technical Reports Server (NTRS)

    Lewis, Timothy A.

    2013-01-01

    A pair of human-in-the-loop simulation evaluations of a distributed air/ground separation assurance system have been conducted to investigate the function allocation between humans and automation systems as well as ground-based and airborne agents in the Next Generation Air Transportation System and beyond. This paper focuses on an analysis of certain critical conflicts observed between self-separating aircraft and ground-managed traffic in the same airspace. The principal cause of each conflict is identified and potential mitigations are discussed, such as: the sharing of trajectory intent information between the ground and the air; more cautious trajectory planning by the self-separating aircraft; and more equitable rules-of-the-road between the self-separating aircraft and ground-managed aircraft. This analysis will inform the ongoing design of an airborne separation assurance automation tool.

  1. An optimization model for regional air pollutants mitigation based on the economic structure adjustment and multiple measures: A case study in Urumqi city, China.

    PubMed

    Sun, Xiaowei; Li, Wei; Xie, Yulei; Huang, Guohe; Dong, Changjuan; Yin, Jianguang

    2016-11-01

    A model based on economic structure adjustment and pollutants mitigation was proposed and applied in Urumqi. Best-worst case analysis and scenarios analysis were performed in the model to guarantee the parameters accuracy, and to analyze the effect of changes of emission reduction styles. Results indicated that pollutant-mitigations of electric power industry, iron and steel industry, and traffic relied mainly on technological transformation measures, engineering transformation measures and structure emission reduction measures, respectively; Pollutant-mitigations of cement industry relied mainly on structure emission reduction measures and technological transformation measures; Pollutant-mitigations of thermal industry relied mainly on the four mitigation measures. They also indicated that structure emission reduction was a better measure for pollutants mitigation of Urumqi. Iron and steel industry contributed greatly in SO2, NOx and PM (particulate matters) emission reduction and should be given special attention in pollutants emission reduction. In addition, the scales of iron and steel industry should be reduced with the decrease of SO2 mitigation amounts. The scales of traffic and electric power industry should be reduced with the decrease of NOx mitigation amounts, and the scales of cement industry and iron and steel industry should be reduced with the decrease of PM mitigation amounts. The study can provide references of pollutants mitigation schemes to decision-makers for regional economic and environmental development in the 12th Five-Year Plan on National Economic and Social Development of Urumqi. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... State owned or operated buildings, infrastructure, and critical facilities located in the identified... vulnerable to damage and loss associated with hazard events. State owned or operated critical facilities...

  3. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... State owned or operated buildings, infrastructure, and critical facilities located in the identified... vulnerable to damage and loss associated with hazard events. State owned or operated critical facilities...

  4. A catchment scale evaluation of multiple stressor effects in headwater streams.

    PubMed

    Rasmussen, Jes J; McKnight, Ursula S; Loinaz, Maria C; Thomsen, Nanna I; Olsson, Mikael E; Bjerg, Poul L; Binning, Philip J; Kronvang, Brian

    2013-01-01

    Mitigation activities to improve water quality and quantity in streams as well as stream management and restoration efforts are conducted in the European Union aiming to improve the chemical, physical and ecological status of streams. Headwater streams are often characterised by impairment of hydromorphological, chemical, and ecological conditions due to multiple anthropogenic impacts. However, they are generally disregarded as water bodies for mitigation activities in the European Water Framework Directive despite their importance for supporting a higher ecological quality in higher order streams. We studied 11 headwater streams in the Hove catchment in the Copenhagen region. All sites had substantial physical habitat and water quality impairments due to anthropogenic influence (intensive agriculture, urban settlements, contaminated sites and low base-flow due to water abstraction activities in the catchment). We aimed to identify the dominating anthropogenic stressors at the catchment scale causing ecological impairment of benthic macroinvertebrate communities and provide a rank-order of importance that could help in prioritising mitigation activities. We identified numerous chemical and hydromorphological impacts of which several were probably causing major ecological impairments, but we were unable to provide a robust rank-ordering of importance suggesting that targeted mitigation efforts on single anthropogenic stressors in the catchment are unlikely to have substantial effects on the ecological quality in these streams. The SPEcies At Risk (SPEAR) index explained most of the variability in the macroinvertebrate community structure, and notably, SPEAR index scores were often very low (<10% SPEAR abundance). An extensive re-sampling of a subset of the streams provided evidence that especially insecticides were probably essential contributors to the overall ecological impairment of these streams. Our results suggest that headwater streams should be considered in future management and mitigation plans. Catchment-based management is necessary because several anthropogenic stressors exceeded problematic thresholds, suggesting that more holistic approaches should be preferred. Copyright © 2012 Elsevier B.V. All rights reserved.

  5. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities.more » Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.« less

  6. Predicting, examining, and evaluating FAC in US power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cohn, M.J.; Garud, Y.S.; Raad, J. de

    1999-11-01

    There have been many pipe failures in fossil and nuclear power plant piping systems caused by flow-accelerated corrosion (FAC). In some piping systems, this failure mechanism maybe the most important type of damage to mitigate because FAC damage has led to catastrophic failures and fatalities. Detecting the damage and mitigating the problem can significantly reduce future forced outages and increase personnel safety. This article discusses the implementation of recent developments to select FAC inspection locations, perform cost-effective examinations, evaluate results, and mitigate FAC failures. These advances include implementing the combination of software to assist in selecting examination locations and anmore » improved pulsed eddy current technique to scan for wall thinning without removing insulation. The use of statistical evaluation methodology and possible mitigation strategies also are discussed.« less

  7. Updated preparedness and response framework for influenza pandemics.

    PubMed

    Holloway, Rachel; Rasmussen, Sonja A; Zaza, Stephanie; Cox, Nancy J; Jernigan, Daniel B

    2014-09-26

    The complexities of planning for and responding to the emergence of novel influenza viruses emphasize the need for systematic frameworks to describe the progression of the event; weigh the risk of emergence and potential public health impact; evaluate transmissibility, antiviral resistance, and severity; and make decisions about interventions. On the basis of experience from recent influenza responses, CDC has updated its framework to describe influenza pandemic progression using six intervals (two prepandemic and four pandemic intervals) and eight domains. This updated framework can be used for influenza pandemic planning and serves as recommendations for risk assessment, decision-making, and action in the United States. The updated framework replaces the U.S. federal government stages from the 2006 implementation plan for the National Strategy for Pandemic Influenza (US Homeland Security Council. National strategy for pandemic influenza: implementation plan. Washington, DC: US Homeland Security Council; 2006. Available at http://www.flu.gov/planning-preparedness/federal/pandemic-influenza-implementation.pdf). The six intervals of the updated framework are as follows: 1) investigation of cases of novel influenza, 2) recognition of increased potential for ongoing transmission, 3) initiation of a pandemic wave, 4) acceleration of a pandemic wave, 5) deceleration of a pandemic wave, and 6) preparation for future pandemic waves. The following eight domains are used to organize response efforts within each interval: incident management, surveillance and epidemiology, laboratory, community mitigation, medical care and countermeasures, vaccine, risk communications, and state/local coordination. Compared with the previous U.S. government stages, this updated framework provides greater detail and clarity regarding the potential timing of key decisions and actions aimed at slowing the spread and mitigating the impact of an emerging pandemic. Use of this updated framework is anticipated to improve pandemic preparedness and response in the United States. Activities and decisions during a response are event-specific. These intervals serve as a reference for public health decision-making by federal, state, and local health authorities in the United States during an influenza pandemic and are not meant to be prescriptive or comprehensive. This framework incorporates information from newly developed tools for pandemic planning and response, including the Influenza Risk Assessment Tool and the Pandemic Severity Assessment Framework, and has been aligned with the pandemic phases restructured in 2013 by the World Health Organization.

  8. Evaluation of noise impact mitigation protocols to support CSS : final report.

    DOT National Transportation Integrated Search

    2008-03-01

    This research project developed and evaluated practical ways of involving the public in context sensitive sound mitigation strategies. The integrated use of photo montage, PowerPoint presentation, linked traffic sound files, and audience response sys...

  9. Susceptibility of SCADA systems and the energy sector

    NASA Astrophysics Data System (ADS)

    Goike, Lindsay

    The research in this paper focused on analyzing SCADA systems in the energy sector for susceptibility to cyber attacks, in furtherance of providing suggestions to mitigate current and future cyber attacks. The research will be addressing the questions: how are SCADA systems susceptible to cyber attacks, and what are the suggested ways to mitigate both current and future cyber attacks. The five main categories of security vulnerabilities facing current SCADA systems were found to be: connectivity to the Internet, failure to plan, interdependency of sectors, numerous different types of threats, and outdated software. Some of the recommendations mentioned to mitigate current and future risks were: virtual private networks, risk assessments, increased physical security, updating of software, and firewalls.

  10. Rainfall-triggered landslides, anthropogenic hazards, and mitigation strategies

    USGS Publications Warehouse

    Larsen, M.C.

    2008-01-01

    Rainfall-triggered landslides are part of a natural process of hillslope erosion that can result in catastrophic loss of life and extensive property damage in mountainous, densely populated areas. As global population expansion on or near steep hillslopes continues, the human and economic costs associated with landslides will increase. Landslide hazard mitigation strategies generally involve hazard assessment mapping, warning systems, control structures, and regional landslide planning and policy development. To be sustainable, hazard mitigation requires that management of natural resources is closely connected to local economic and social interests. A successful strategy is dependent on a combination of multi-disciplinary scientific and engineering approaches, and the political will to take action at the local community to national scale.

  11. Assessment of indirect losses and costs of emergency for project planning of alpine hazard mitigation

    NASA Astrophysics Data System (ADS)

    Amenda, Lisa; Pfurtscheller, Clemens

    2013-04-01

    By virtue of augmented settling in hazardous areas and increased asset values, natural disasters such as floods, landslides and rockfalls cause high economic losses in Alpine lateral valleys. Especially in small municipalities, indirect losses, mainly stemming from a breakdown of transport networks, and costs of emergency can reach critical levels. A quantification of these losses is necessary to estimate the worthiness of mitigation measures, to determine the appropriate level of disaster assistance and to improve risk management strategies. There are comprehensive approaches available for assessing direct losses. However, indirect losses and costs of emergency are widely not assessed and the empirical basis for estimating these costs is weak. To address the resulting uncertainties of project appraisals, a standardized methodology has been developed dealing with issues of local economic effects and emergency efforts needed. In our approach, the cost-benefit-analysis for technical mitigation of the Austrian Torrent and Avalanche Control (TAC) will be optimized and extended using the 2005-debris flow as a design event, which struggled a small town in the upper Inn valley in southwest Tyrol (Austria). Thereby, 84 buildings were affected, 430 people were evacuated and due to this, the TAC implemented protection measures for 3.75 million Euros. Upgrading the method of the TAC and analyzing to what extent the cost-benefit-ratio is about to change, is one of the main objectives of this study. For estimating short-run indirect effects and costs of emergency on the local level, data was collected via questionnaires, field mapping, guided interviews, as well as intense literature research. According to this, up-to-date calculation methods were evolved and the cost-benefit-analysis of TAC was recalculated with these new-implemented results. The cost-benefit-ratio will be more precise and specific and hence, the decision, which mitigation alternative will be carried out. Based on this, the worthiness of the mitigation measures can be determined in more detail and the proper level of emergency assistance can be calculated more adequately. By dint of this study, a better data basis will be created evaluating technical and non-technical mitigation measures, which is useful for government agencies, insurance companies and research.

  12. Vegetation Description, Rare Plant Inventory, and Vegetation Monitoring for Craig Mountain, Idaho.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mancuso, Michael; Moseley, Robert

    The Craig Mountain Wildlife Mitigation Area was purchased by Bonneville Power Administration (BPA) as partial mitigation for wildlife losses incurred with the inundation of Dworshak Reservoir on the North Fork Clearwater River. Upon completion of the National Environmental Protection Act (NEPA) process, it is proposed that title to mitigation lands will be given to the Idaho Department of Fish and Game (IDFG). Craig Mountain is located at the northern end of the Hells Canyon Ecosystem. It encompasses the plateau and steep canyon slopes extending from the confluence of the Snake and Salmon rivers, northward to near Waha, south of Lewiston,more » Idaho. The forested summit of Craig Mountain is characterized by gently rolling terrain. The highlands dramatically break into the canyons of the Snake and Salmon rivers at approximately the 4,700 foot contour. The highly dissected canyons are dominated by grassland slopes containing a mosaic of shrubfield, riparian, and woodland habitats. During the 1993 and 1994 field seasons, wildlife, habitat/vegetation, timber, and other resources were systematically inventoried at Craig Mountain to provide Fish and Game managers with information needed to draft an ecologically-based management plan. The results of the habitat/vegetation portion of the inventory are contained in this report. The responsibilities for the Craig Mountain project included: (1) vegetation data collection, and vegetation classification, to help produce a GIS-generated Craig Mountain vegetation map, (2) to determine the distribution and abundance of rare plants populations and make recommendations concerning their management, and (3) to establish a vegetation monitoring program to evaluate the effects of Fish and Game management actions, and to assess progress towards meeting habitat mitigation goals.« less

  13. Uncertainty Quantification and Risk Mitigation of CO2 Leakage in Groundwater Aquifers

    NASA Astrophysics Data System (ADS)

    Sun, Y.; Tong, C.; Mansoor, K.; Carroll, S.

    2013-12-01

    The risk of CO2 leakage into shallow aquifers through various pathways such as faults and abandoned wells is a concern of CO2 geological sequestration. If a leak is detected in an aquifer system, a contingency plan is required to manage the CO2 storage and to protect the groundwater source. Among many remediation and mitigation strategies, the simplest is to stop CO2 leakage at a wellbore. Therefore, it is necessary to address whether and when the CO2 leaks should be sealed, and how much risk can be mitigated. In the presence of various uncertainties, including geological-structure uncertainty and parametric uncertainty, the risk of CO2 leakage into an aquifer needs to be assessed with probabilistic distributions of uncertain parameters. In this study, we developed an integrated model to simulate multiphase flow of CO2 and brine in a deep storage reservoir, through a leaky well at an uncertain location, and subsequently multicomponent reactive transport in a shallow aquifer. Each sub-model covers its domain-specific physics. Uncertainties of geological structure and parameters are considered together with decision variables (CO2 injection rate and mitigation time) for risk assessment of leakage-impacted aquifer volume. High-resolution and less-expensive reduced-order models (ROMs) of risk profiles are approximated as polynomial functions of decision variables and all uncertain parameters. These reduced-order models are then used in the place of computationally-expensive numerical models for future decision-making on if and when the leaky well is sealed. The tradeoff between CO2 storage capacity in the reservoir and the leakage-induced risk in the aquifer is evaluated. This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract DE-AC52-07NA27344.

  14. Expeditionary Force Health Protection for Global Health Engagement: Lessons Learned from Continuing Promise 2017.

    PubMed

    Johnson, Lucas A; Lennon, Robert P

    2018-05-01

    Global health engagement (GHE) is an important priority for the Military Health Service as such activities strengthen the health capabilities of partner nations and improve interoperability. By their very nature, GHE activities are predominantly conducted in low-resource areas with limited infrastructure and substantial humanitarian need. The Department of Defense is evaluating leaner, flexible force packages to accomplish GHE missions and better prepare uniformed medical providers to provide care in austere environments. Observations made during the execution of Continuing Promise 2017, a recurring civil-military humanitarian operation conducted in Central and South America, are offered herein. Descriptions of relevant force health protection (FHP) threats experienced by mission personnel and mitigation measures successfully employed to prevent illness are provided. Relevant Department of Defense instructions are reviewed and risk mitigation strategies are compared with published standards and expert recommendations. In addition to well-described sanitation, hygiene, and infectious disease challenges that traditionally accompany military field activities, providing health care services to host nation populations in low-resource settings generates unique FHP vulnerabilities. Public health expertise leveraged throughout the planning and execution of GHE activities is instrumental for successfully identifying and mitigating the numerous FHP risks present. Experiences from Continuing Promise 2017 demonstrate the expeditionary public health practitioner's role as a force multiplier has never been more relevant. A variety of public health countermeasures are available to successfully mitigate FHP threats experienced during GHE events. The public health lessons learned from Continuing Promise 2017 assist mission planners, commanders, and health care providers ensure that GHE participants remain healthy enough to accomplish the mission and meet America's commitments to partner nations.

  15. Anthropogenic impact on flood-risk: a large-scale assessment for planning controlled inundation strategies along the River Po

    NASA Astrophysics Data System (ADS)

    Domeneghetti, Alessio; Castellarin, Attilio; Brath, Armando

    2013-04-01

    The European Flood Directive (2007/60/EC) has fostered the development of innovative and sustainable approaches and methodologies for flood-risk mitigation and management. Furthermore, concerning flood-risk mitigation, the increasing awareness of how the anthropogenic pressures (e.g. demographic and land-use dynamics, uncontrolled urban and industrial expansion on flood-prone area) could strongly increase potential flood damages and losses has triggered a paradigm shift from "defending the territory against flooding" (e.g. by means of levee system strengthening and heightening) to "living with floods" (e.g. promoting compatible land-uses or adopting controlled flooding strategies of areas located outside the main embankments). The assessment of how socio-economic dynamics may influence flood-risk represents a fundamental skill that should be considered for planning a sustainable industrial and urban development of flood-prone areas, reducing their vulnerability and therefore minimizing socio-economic and ecological losses due to large flood events. These aspects, which are of fundamental importance for Institutions and public bodies in charge of Flood Directive requirements, need to be considered through a holistic approach at river basin scale. This study focuses on the evaluation of large-scale flood-risk mitigation strategies for the middle-lower reach of River Po (~350km), the longest Italian river and the largest in terms of streamflow. Due to the social and economical importance of the Po River floodplain (almost 40% of the total national gross product results from this area), our study aims at investigating the potential of combining simplified vulnerability indices with a quasi-2D model for the definition of sustainable and robust flood-risk mitigation strategies. Referring to past (1954) and recent (2006) land-use data sets (e.g. CORINE) we propose simplified vulnerability indices for assessing potential flood-risk of industrial and urbanized flood prone areas taking into account altimetry and population density, and we analyze the modification of flood-risk occurred during last decades due to the demographic dynamics of the River Po floodplains. Flood hazard associated to a high magnitude event (i.e. return period of about 500 year) was estimated by means of a quasi-2D hydraulic model set up for the middle-lower portion of the Po River and for its major tributaries. The results of the study highlight how coupling a large-scale numerical model with the proposed flood-vulnerability indices could be a useful tool for decision-makers when they are called to define sustainable spatial development plans for the study area, or when they need to identify priorities in the organization of civil protection actions during a major flood event that could include the necessity of controlled flooding of flood-prone areas located outside the main embankment system.

  16. Service Center for Climate Change Adaptation in Agriculture - an initiative of the University of West Hungary

    NASA Astrophysics Data System (ADS)

    Matyas, Cs.; Berki, I.; Drüszler, A.; Eredics, A.; Galos, B.; Moricz, N.; Rasztovits, E.

    2012-04-01

    In whole Central Europe agricultural production is highly vulnerable and sensitive to impacts of projected climatic changes. The low-elevation regions of the Carpathian Basin (most of the territory of Hungary), where precipitation is the minimum factor of production, are especially exposed to climatic extremes, especially to droughts. Rainfed agriculture, animal husbandry on nature-close pastures and nature-close forestry are the most sensitive sectors due to limited possibilities to counterbalance moisture supply constraints. These sectors have to be best prepared to frequency increase of extreme events, disasters and economic losses. So far, there is a lack of information about the middle and long term consequences on regional and local level. Therefore the importance of complex, long term management planning and of land use optimation is increasing. The aim of the initiative is to set up a fine-scale, GIS-based, complex, integrated system for the definition of the most important regional and local challenges and tasks of climate change adaptation and mitigation in agriculture, forestry, animal husbandry and also nature protection. The Service Center for Climate Change Adaptation in Agriculture is planned to provide the following services: § Complex, GIS-supported database, which integrates the basic information about present and projected climates, extremes, hydrology and soil conditions; § Evaluation of existing satellite-based and earth-based monitoring systems; § GIS-supported information about the future trends of climate change impacts on the agroecological potential and sensitivity status on regional and local level (e.g. land cover/use and expectable changes, production, water and carbon cycle, biodiversity and other ecosystem services, potential pests and diseases, tolerance limits etc.) in fine-scale horizontal resolution, based first of all on natural produce, including also social and economic consequences; § Complex decision supporting system on regional and local scale for middle- and long term adaptation and mitigation strategies, providing information on optimum technologies and energy balances. Cooperation with already existing Climate Service Centres and national and international collaboration in monitoring and research are important elements of the activity of the Centre. In the future, the Centre is planned to form part of a national information system on climate change adaptation and mitigation, supported by the Ministry of Development. Keywords: climate change impacts, forestry, rainfed agriculture, animal husbandry

  17. Speed Versus Accuracy: A Zero Sum Game

    DTIC Science & Technology

    2009-05-11

    sacrificed to mitigate the risk to credibility. In Ongoing Crisis Communication : Planning, Managing, and Responding, Timothy W. Coombs presents speed in...Carlson and Abelson, 24. 10 Timothy W. Coombs , Crisis Management and Communication , http://www.instituteforpr.org/essential_knowledge/detail...crisi_management_and_communication s (accessed 30 April 2009). 11 Timothy W. Coombs , Ongoing Crisis Communication : Planning, Managing, and Responding, 2nd

  18. Patterns of red tree vole distribution and habitat suitability: implications for surveys and conservation planning

    Treesearch

    Daniel K. Rosenberg; Raymond J. Davis; Kelli J. Van Norman; Jeffrey R. Dunk; Eric D. Forsman; Robert D. Huff

    2016-01-01

    Environmental regulations often require wildlife surveys prior to habitat disturbance to avoid impacts or as the basis for planning mitigation, yet project-level surveys may not provide the insights needed to guide long-term management. Management of the red tree vole (Arborimus longicaudus) has largely been based on such surveys. As an alternative...

  19. Assessing the impacts of federal forest planning on wildfire risk-mitigation in the Pacific Northwest, USA

    Treesearch

    Alan A. Ager; Michelle A. Day; Karen C. Short; Cody R. Evers

    2016-01-01

    We analyzed the impact of amenity and biodiversity protection as mandated in national forest plans on the implementation of hazardous fuel reduction treatments aimed at protecting the wildland urban interface (WUI) and restoring fire resilient forests. We used simulation modeling to delineate areas on national forests that can potentially transmit fires to...

  20. 45 CFR 155.210 - Navigator program standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... individuals to be awarded Navigator grants, designed to prevent, minimize and mitigate any conflicts of... substantive benefits or comparative benefits of different health plans. (D) Requiring that a Navigator hold an...

Top