Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…
Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…
ERIC Educational Resources Information Center
Granville, Arthur; And Others
This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…
National Home Start Evaluation. Interim Report V: Case Studies.
ERIC Educational Resources Information Center
Jerome, Chris H.; And Others
One of a series of documents on the evaluation of the National Home Start (NHS) program this third year interim report of case studies describes program efforts and successes with 16 Home Start families throughout the nation. A federally funded demonstration program, NHS is aimed at providing home-based services (such as health, education,…
Evaluation of ERA-Interim precipitation data in complex terrain
NASA Astrophysics Data System (ADS)
Gao, Lu; Bernhardt, Matthias; Schulz, Karsten
2013-04-01
Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…
An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions
ERIC Educational Resources Information Center
Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian
2014-01-01
A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…
DOT National Transportation Integrated Search
1987-01-01
This interim report presents the results after 5 years of a study undertaken to evaluate multiple layer polymer concrete overlays over a 10-year period. The report indicates that an overlay of low permeability and high skid resistance can be successf...
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This third year interim report, one of a series of documents on the evaluation of Project Developmental Continuity (PDC), presents findings from three major analyses of program implementation; measurement of the extent each program has implemented the basic PDC Guidelines; a description of patterns of that implementation; and analysis of some…
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…
EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.
EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.
EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-31
This appendix is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This appendix provides the legal/regulatory reference material, supportive of Volume 2 - GSFLS Visit Finding and Evaluations; and certain background material on British Nuclear Fuel Limited (BNFL).
Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung
2017-01-01
Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.
DOT National Transportation Integrated Search
1999-11-01
The objective of this study is to determine the sensor survivability, accuracy and reliability of quartz-piezoelectric weigh-in-motion (WIM) sensors under actual traffic conditions in Connecticut's environment. This second interim report provides a s...
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...
An Approach for Evaluating the Technical Quality of Interim Assessments
ERIC Educational Resources Information Center
Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian
2010-01-01
Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…
DOT National Transportation Integrated Search
2014-02-27
This interim report was prepared to assist NCDMV in meeting the requirements of S.B. 402, Sec. 34.17, which mandates that NCDOT in collaboration with NCDMV shall evaluate current contractual models and compensation for license plate agency (LPA...
Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.
Dallas, Michael J
2008-01-01
Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.
Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…
Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…
Walter, S D; Han, H; Briel, M; Guyatt, G H
2017-04-30
In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.
Fit of interim crowns fabricated using photopolymer-jetting 3D printing.
Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong
2017-08-01
The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P<.001). In the axial regions, even though the mean discrepancy was smallest in the molding group, the data showed large deviations. In the occlusal region, the polymer-jetting group was the most accurate, and compared with the other groups, the milling group showed larger internal discrepancies (P<.001). Polymer-jet 3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Interim Evaluation of the National Literacy Program. Final Report
ERIC Educational Resources Information Center
Human Resources and Social Development Canada, 2007
2007-01-01
The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
NASA Astrophysics Data System (ADS)
Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram
2016-04-01
Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability of false detection (POFD) IMERG yields a better value of POD, TS, FAR and POFD in comparison to era-Interim. Overall, ERA-Interim product produced fewer robust results when compared to IMERG.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Science Opportunities Enabled by NASA's Constellation System: Interim Report
NASA Astrophysics Data System (ADS)
Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council
To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-31
This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less
Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.
DOT National Transportation Integrated Search
1980-04-01
This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...
Do Interim Assessments Reduce the Race and SES Achievement Gaps?
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie
2017-01-01
The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
HAASS, C.C.
1999-10-14
Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.
Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F
2013-05-01
At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.
In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.
Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang
2016-05-01
The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)
NASA Technical Reports Server (NTRS)
Kenney, G. P.
1975-01-01
The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.
Evaluation of wide edgelines on two-lane rural roads : interim report.
DOT National Transportation Integrated Search
1985-01-01
This interim report presents the results of an evaluation of 4-in and 8-in wide edgellnes on the lateral placement and speeds of vehicles on two-lane rural roads. Data were collected at twelve locations on sections of roadway covering 55.2 ml. Two me...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.
This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.
ERIC Educational Resources Information Center
Egan, Thomas A.; Seidel, Janet C.
Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four…
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
To determine the merit of a petition to remove ethylene glycol ether (EGBE) from the Agency's Hazardous Air Pollutant (HAP) list, EPA has developed an interim final position paper, called An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether, tha...
ERIC Educational Resources Information Center
Nebraska Legislative Council, Lincoln. Legislative Research Div.
During the spring of 1987, the National Conference of State Legislatures awarded the Nebraska Legislature a cost-sharing award to study local school evaluation processes. Embodied in Legislative Resolution 181, which has the purpose of studying school evaluation procedures, the study attempts to provide legislators, educators, local school…
Interim Policy for Evaluation of Stereoisomeric Pesticides
An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.
Interim reliability evaluation program, Browns Ferry fault trees
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, M.E.
1981-01-01
An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.
The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.
ERIC Educational Resources Information Center
Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris
This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…
The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report
ERIC Educational Resources Information Center
Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne
2014-01-01
The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…
Home Start Evaluation Study. Interim Case Studies IIa.
ERIC Educational Resources Information Center
Fein, Robert
This formative evaluation study of Home Start uses a case study approach. A brief case study focuses on the administrative structure and staff resources and responsibilities of National Home Start. Also included are reports on seven local programs developed after two field visits had been made to each program. In the first visit, objectives chosen…
DOT National Transportation Integrated Search
1990-01-01
This is the second report to result from the subject study. It represents the first major effort to evaluate the available data on "thin pavement surface treatments" in Oregon and to define "cost effectiveness" for this purpose. The 87 projects studi...
ERIC Educational Resources Information Center
D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin
In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…
National Home Start Evaluation Interim Report VII. Twenty-Month Program Analysis and Findings.
ERIC Educational Resources Information Center
Love, John M.; And Others
This interim evaluation report focuses on process (formative) and outcome (summative) data collected in spring 1975 on the National Home Start Program. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with…
Vibratory roller evaluation study : interim report No. 1.
DOT National Transportation Integrated Search
1974-08-01
The Louisiana Department of Highways has in progress a two phase program to evaluate the use of vibratory rollers in the compaction of asphaltic concrete pavements. Phase one on the first construction project is now complete with eight different vibr...
DOT National Transportation Integrated Search
2010-10-01
This research study evaluated the performance of various pavement preservation treatments over time and under different : environmental conditions to quantify the economics of each treatment type. There are three primary techniques utilized in Colora...
ERIC Educational Resources Information Center
Colorado State General Assembly, Denver. Legislative Council.
The Interim Committee on Teacher Evaluation and Dismissal was established by (Colorado) Senate Joint Resolution 97-14 to study the state's teacher evaluation and dismissal laws and explore alternatives. The committee was directed to study the relationship between education reform and employment protections for teachers; the effectiveness of adding…
Evaluation of experimental rumble strip areas in Louisiana : interim report No. 1.
DOT National Transportation Integrated Search
1985-03-01
This interim report was prepared to provide a review of nineteen rumble strip areas installed experimentally in Louisiana between August 1982 and September 1983. Situated randomly throughout central and southern Louisiana, construction of these coars...
Re-use of pilot data and interim analysis of pivotal data in MRMC studies: a simulation study
NASA Astrophysics Data System (ADS)
Chen, Weijie; Samuelson, Frank; Sahiner, Berkman; Petrick, Nicholas
2017-03-01
Novel medical imaging devices are often evaluated with multi-reader multi-case (MRMC) studies in which radiologists read images of patient cases for a specified clinical task (e.g., cancer detection). A pilot study is often used to measure the effect size and variance parameters that are necessary for sizing a pivotal study (including sizing readers, non-diseased and diseased cases). Due to the practical difficulty of collecting patient cases or recruiting clinical readers, some investigators attempt to include the pilot data as part of their pivotal study. In other situations, some investigators attempt to perform an interim analysis of their pivotal study data based upon which the sample sizes may be re-estimated. Re-use of the pilot data or interim analyses of the pivotal data may inflate the type I error of the pivotal study. In this work, we use the Roe and Metz model to simulate MRMC data under the null hypothesis (i.e., two devices have equal diagnostic performance) and investigate the type I error rate for several practical designs involving re-use of pilot data or interim analysis of pivotal data. Our preliminary simulation results indicate that, under the simulation conditions we investigated, the inflation of type I error is none or only marginal for some design strategies (e.g., re-use of patient data without re-using readers, and size re-estimation without using the effect-size estimated in the interim analysis). Upon further verifications, these are potentially useful design methods in that they may help make a study less burdensome and have a better chance to succeed without substantial loss of the statistical rigor.
NASA Astrophysics Data System (ADS)
Srivastava, Prashant K.; Han, Dawei; Islam, Tanvir; Petropoulos, George P.; Gupta, Manika; Dai, Qiang
2016-04-01
Reference evapotranspiration (ETo) is an important variable in hydrological modeling, which is not always available, especially for ungauged catchments. Satellite data, such as those available from the MODerate Resolution Imaging Spectroradiometer (MODIS), and global datasets via the European Centre for Medium Range Weather Forecasts (ECMWF) reanalysis (ERA) interim and National Centers for Environmental Prediction (NCEP) reanalysis are important sources of information for ETo. This study explored the seasonal performances of MODIS (MOD16) and Weather Research and Forecasting (WRF) model downscaled global reanalysis datasets, such as ERA interim and NCEP-derived ETo, against ground-based datasets. Overall, on the basis of the statistical metrics computed, ETo derived from ERA interim and MODIS were more accurate in comparison to the estimates from NCEP for all the seasons. The pooled datasets also revealed a similar performance to the seasonal assessment with higher agreement for the ERA interim (r = 0.96, RMSE = 2.76 mm/8 days; bias = 0.24 mm/8 days), followed by MODIS (r = 0.95, RMSE = 7.66 mm/8 days; bias = -7.17 mm/8 days) and NCEP (r = 0.76, RMSE = 11.81 mm/8 days; bias = -10.20 mm/8 days). The only limitation with downscaling ERA interim reanalysis datasets using WRF is that it is time-consuming in contrast to the readily available MODIS operational product for use in mesoscale studies and practical applications.
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…
Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…
Evaluation of US 119 Pine Mountain safety improvements : interim report.
DOT National Transportation Integrated Search
2003-10-01
The safety improvement project for a section of US 119 across Pine Mountain in Letcher County was initiated as an interim effort to address safety issues related t o roadway geometrics and specific problems related to truck traffic. : Specific object...
Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.
ERIC Educational Resources Information Center
Deloria, Dennis; And Others
This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…
NASA Technical Reports Server (NTRS)
Kitzis, J. L.; Kitzis, S. N.
1979-01-01
The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.
ERIC Educational Resources Information Center
Evaluation and Training Inst., Los Angeles, CA.
Twenty-one California career-vocational educational articulation projects, commonly referred to as 2 + 2 partnerships, were jointly funded across the 1986-89 funding period and third-party evaluations were conducted in 1988-89. The longitudinal study examined the long-term effects of the original partnerships. Evaluators formed an advisory…
NASA Technical Reports Server (NTRS)
Kitzis, J. L.; Kitzis, S. N.
1979-01-01
The brightness temperature data produced by the SMMR final Antenna Pattern Correction (APC) algorithm is discussed. The algorithm consisted of: (1) a direct comparison of the outputs of the final and interim APC algorithms; and (2) an analysis of a possible relationship between observed cross track gradients in the interim brightness temperatures and the asymmetry in the antenna temperature data. Results indicate a bias between the brightness temperature produced by the final and interim APC algorithm.
DOT National Transportation Integrated Search
1998-01-01
This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...
Control strip study : interim report.
DOT National Transportation Integrated Search
1972-01-01
This report is concerned with the application of the "control strip" technique using nuclear devices for compaction control of certain base courses and asphaltic concrete surface course. The technique, as evaluated here, consisted of applying increas...
ERIC Educational Resources Information Center
Rosario, Jose; And Others
As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…
Institute for Developmental Studies Interim Progress Report. Part II: Research and Evaluation.
ERIC Educational Resources Information Center
Deutsch, Martin; And Others
The Institute for Developmental Studies (IDS) is engaged in research aimed at specifying what the academic handicaps of deprived children are, what causes these handicaps, and what can be done to overcome them. This IDS report on their research and evaluation program is divided into two sections. The first, "Summaries of Basic Research, Applied…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.
ERIC Educational Resources Information Center
Bezdek, Roger
This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…
The Urban Consumer Education Project. Interim Report, 1979-80.
ERIC Educational Resources Information Center
Marshall, Gail; Haas, Kay
This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…
Texturing of concrete pavements : interim report No. 2.
DOT National Transportation Integrated Search
1976-09-01
The purpose of this research study is to document and evaluate the findings of the Category II experimental concrete texturing project. Under this plan of experimental study, several texting techniques were tried and will be compared in order to dete...
2013-01-01
An injector needle is shown for each test in Figure 41. UNCLASSIFIED 37 UNCLASSIFIED Full Needle 60°C Ultra Low Sulfur Diesel 60°C...UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF...UNCLASSIFIED UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF
Han, Kelong; Claret, Laurent; Sandler, Alan; Das, Asha; Jin, Jin; Bruno, Rene
2016-07-13
Maintenance treatment (MTx) in responders following first-line treatment has been investigated and practiced for many cancers. Modeling and simulation may support interpretation of interim data and development decisions. We aimed to develop a modeling framework to simulate overall survival (OS) for MTx in NSCLC using tumor growth inhibition (TGI) data. TGI metrics were estimated using longitudinal tumor size data from two Phase III first-line NSCLC studies evaluating bevacizumab and erlotinib as MTx in 1632 patients. Baseline prognostic factors and TGI metric estimates were assessed in multivariate parametric models to predict OS. The OS model was externally validated by simulating a third independent NSCLC study (n = 253) based on interim TGI data (up to progression-free survival database lock). The third study evaluated pemetrexed + bevacizumab vs. bevacizumab alone as MTx. Time-to-tumor-growth (TTG) was the best TGI metric to predict OS. TTG, baseline tumor size, ECOG score, Asian ethnicity, age, and gender were significant covariates in the final OS model. The OS model was qualified by simulating OS distributions and hazard ratios (HR) in the two studies used for model-building. Simulations of the third independent study based on interim TGI data showed that pemetrexed + bevacizumab MTx was unlikely to significantly prolong OS vs. bevacizumab alone given the current sample size (predicted HR: 0.81; 95 % prediction interval: 0.59-1.09). Predicted median OS was 17.3 months and 14.7 months in both arms, respectively. These simulations are consistent with the results of the final OS analysis published 2 years later (observed HR: 0.87; 95 % confidence interval: 0.63-1.21). Final observed median OS was 17.1 months and 13.2 months in both arms, respectively, consistent with our predictions. A robust TGI-OS model was developed for MTx in NSCLC. TTG captures treatment effect. The model successfully predicted the OS outcomes of an independent study based on interim TGI data and thus may facilitate trial simulation and interpretation of interim data. The model was built based on erlotinib data and externally validated using pemetrexed data, suggesting that TGI-OS models may be treatment-independent. The results supported the use of longitudinal tumor size and TTG as endpoints in early clinical oncology studies.
Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system.
Lee, Wan-Sun; Lee, Du-Hyeong; Lee, Kyu-Bok
2017-08-01
This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. The discrepancy means (standard deviation) of the 3 groups are 171.6 (97.4) µm for the crown manufactured by the milling system and 149.1 (65.9) and 91.1 (36.4) µm, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.
Cost Implications of an Interim Storage Facility in the Waste Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L
2016-09-01
This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.
Louisiana experimental base project : interim report No. 1.
DOT National Transportation Integrated Search
1979-11-01
The Louisiana Experimental Base Project is a research study evaluating the design/performance characteristics of three types of base courses as incorporated into comparable flexible pavement systems on a full-scale test road. Fourteen different test ...
Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.
Shek, Daniel T L; Yu, Lu; Chan, Alex C W
2012-01-17
An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.
ERIC Educational Resources Information Center
Berrueta-Clement, John; And Others
Fifth in a series of six volumes reporting outcomes of the preliminary evaluation of an educational intervention, this report presents the findings of the effects of Project Developmental Continuity (PDC) up to the time the evaluation study's cohort of children completed grade 1. Preliminary findings concerning the relationship between variables…
DOT National Transportation Integrated Search
1982-01-01
This study sought to evaluate the impact of the four basic treatment combinations of the rehabilitation component of the Virginia driver improvement program. It was found that receipt of a warning letter from the Division of Motor Vehicles had no eff...
Reinforcement of a PMMA resin for interim fixed prostheses with silica nanoparticles.
Topouzi, Marianthi; Kontonasaki, Eleana; Bikiaris, Dimitrios; Papadopoulou, Lambrini; Paraskevopoulos, Konstantinos M; Koidis, Petros
2017-05-01
Fractures in long span provisional/interim restorations are a common complication. Adequate fracture toughness is necessary to resist occlusal forces and crack propagation, so these restorations should be constructed with materials of improved mechanical properties. The aim of this study was to investigate the possible reinforcement of neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles in a PMMA resin for fixed interim restorations. Composite PMMA-Silica nanoparticles powders were mixed with PMMA liquid and compact bar shaped specimens were fabricated according to the British standard BS EN ISO 127337:2005. The single-edge notched method was used to evaluate fracture toughness (three-point bending test), while the dynamic thermomechanical properties (Storage Modulus, Loss Modulus, tanδ) of a series of nanocomposites with different amounts of nanoparticles (0.25%, 0.50%, 0.75%, 1% w.t.) were evaluated. Statistical analysis was performed and the statistically significant level was set to p<0.05. The fracture toughness of all experimental composites was remarkably higher compared to control. There was a tendency to decrease of fracture toughness, by increasing the concentration of the filler. No statistically significant differences were detected among the modified/unmodified silica nanoparticles. Dynamic mechanical properties were also affected. By increasing the silica nanoparticles content an increase in Storage Modulus was recorded, while Glass Transition Temperature was shifted at higher temperatures. Under the limitations of this in-vitro study, it can be suggested that both neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles, especially at low concentrations, may enhance the overall performance of fixed interim prostheses, as can effectively increase the fracture toughness, the elastic modulus and the Glass Transition Temperature of PMMA resins used in fixed provisional restorations. Copyright © 2017 Elsevier Ltd. All rights reserved.
2009-01-01
Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383
Use of improved structural materials systems in marine piling : interim report.
DOT National Transportation Integrated Search
1982-09-01
This report contains the results of a study to evaluate the feasibility of manufacturing precast, prestressed marine pile from polymer concrete, polymer impregnated concrete, internally sealed concrete and latex modified concrete. Included in the rep...
Effectiveness of the Illinois .08 law
DOT National Transportation Integrated Search
2000-12-01
This interim report presents the preliminary findings and tentative conclusions of an evaluation of the .08 law enacted in Illinois in July 1997. The three main objectives of the study are to (1) determine the public's awareness, knowledge, and suppo...
Flight set 360L007 (STS-33) insulation component. Volume 3: Final release
NASA Technical Reports Server (NTRS)
Hicken, Steve
1990-01-01
Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
Science Opportunities Enabled by NASA's Constellation System: Interim Report
NASA Technical Reports Server (NTRS)
2008-01-01
In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies on two criteria: whether the concepts offered the potential for a significant scientific advance, and whether or not the concepts would benefit from the Constellation System. The committee determined that all of the concepts offered the possibility of a significant scientific advance, but it cautions that such an evaluation ultimately must be made by the decadal survey process, and it emphasizes that this interim report s evaluation should not be considered to be an endorsement of the scientific merit of these proposals, which must of course be evaluated relative to other proposals. The committee determined that seven of these concepts would benefit from the Constellation System, whereas four would not, but it stresses that this conclusion does not reflect an evaluation of the scientific merit of the projects, but rather an assessment of whether or not new capabilities provided by the Constellation System could significantly affect them. Some of the mission concepts, such as the Advanced Compton Telescope, already offer a significant scientific advance and fit easily within the mass and volume constraints of existing launch vehicles. Other mission concepts, such as the Palmer Quest proposal to drill through the Mars polar cap, are not constrained by the launch vehicle, but rather by other technology limitations. The committee evaluated the mission concepts as presented to it, aware nevertheless that proposing a far larger and more ambitious mission with the same science goals might be possible given the capabilities of the Ares V launch vehicle. (Such proposals can be submitted in response to the committee s request for information to be evaluated in its final report.) See Table S.1 for a summary of the Vision Missions, including their cost estimates, technical maturity, and reasons that they might benefit from the Constellation System. The committee developed several findings and recommendations.
IUS/TUG orbital operations and mission support study. Volume 2: Interim upper stage operations
NASA Technical Reports Server (NTRS)
1975-01-01
Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.
ERIC Educational Resources Information Center
Tracor, Inc., Austin, TX.
Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…
ERIC Educational Resources Information Center
Wacker, Sally; And Others
The fourth in a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC), this volume reports treatment-related and other findings concerning teachers and classrooms up to the time the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that…
Adams, Hugo J A; Kwee, Thomas C
2016-10-01
This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Interim Administrators in Higher Education: A National Study
ERIC Educational Resources Information Center
Huff, Marie Thielke; Neubrander, Judy
2015-01-01
The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…
Asphaltic concrete overlays of rigid and flexible pavements : interim report No. 1.
DOT National Transportation Integrated Search
1977-09-01
This study evaluated the effect of a given thickness of asphaltic concrete overlay in rehabilitating 53 test sections conforming to the experiment design. This factorial design specified various levels of traffic intensity and overlay thickness for b...
ERIC Educational Resources Information Center
Behr, Shirley K.; And Others
The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…
ERIC Educational Resources Information Center
Powell, Marjorie; And Others
The final volume in a series of six evaluation reports, this document provides a summary of the results of the evaluation of Project Developmental Continuity (PDC), conducted when the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that disadvantaged children receive continuous…
Presidential Transition: The Experience of Two Community College Interim Presidents
ERIC Educational Resources Information Center
Thompson, Matthew D.
2010-01-01
The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…
Thompson, Geoffrey A; Luo, Qing
2014-09-01
Because polymer-based interim restorative materials are weak, even well-made restorations sometimes fail before the definitive restoration is ready for insertion. Therefore, knowing which fabrication procedures and service conditions affect mechanical properties is important, particularly over an extended period. The purpose of this study was to evaluate the effect of thermal treatment, surface sealing, thermocycling, storage media, storage temperature, and age on autopolymerizing poly(methylmethacrylate) and bis-acryl interim restorative materials. Outcome measures were flexural strength, Vickers surface microhardness, and impact strength. Flexural strength and microhardness of poly(methylmethacrylate) (Jet Acrylic) and 2 bis-acryl-composite resin (Protemp 3 Garant and Integrity) interim restorative materials were evaluated as affected by storage media, storage temperature, storage time, thermocycling, postpolymerization thermal treatment, or application of a surface sealer. In total, 2880 beam specimens (25×2×2 mm) were fabricated. Mechanical property analyses were made at 10 days, 30 days, 6 months, and 1 year after specimen preparation. Flexural strength was determined by using a 3-point bending test in a universal testing machine with a 1 kN load cell at a crosshead speed of 5.0 mm min(-1). Fracture specimens were recovered and used for determining Vickers microhardness. Measurements were made with a 0.1 N load and 15 second dwell time. Three microhardness measurements were made for each specimen, and the mean was used for reporting Vickers microhardness. Notched impact specimens (64×12.7×6.35 mm) were fabricated from Jet, Protemp 3 Garant, and Integrity interim restorative materials, yielding 288 impact specimens. Impact strengths were assessed at 10 days, 30 days, 6 months, and 1 year with a 2 J pendulum. The effects of the various experimental treatments were determined and rank ordered with analysis of variance, F ratios, and least square means differences Student t tests (α=.05). All experimental treatments investigated had significant effects on flexural strength, with material (P<.001) and thermocycling (P<.001) being dominant. Moreover, all experimental treatments investigated had a significant overall impact on Vickers microhardness with material (P<.001) and Palaseal glaze (P<.001) showing large effects. Material (P<.001) and age (P=.010) had a significant effect on impact strength. Mechanical properties of some interim polymeric materials can be improved by postpolymerization heat treatments or surface glazing. This procedure may extend the useful lifetime of some bis-acryl interim restorations. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
DOT National Transportation Integrated Search
2001-03-01
Three test lanes were constructed at the Louisiana Pavement Research Facility to study the performance of Reclaimed Asphalt Pavement (RAP) as a stress relieving layer between the cement treated base and asphalt concrete layers in lieu of crushed ston...
Lagrangian large eddy simulations of boundary layer clouds on ERA-Interim and ERA5 trajectories
NASA Astrophysics Data System (ADS)
Kazil, J.; Feingold, G.; Yamaguchi, T.
2017-12-01
This exploratory study examines Lagrangian large eddy simulations of boundary layer clouds along wind trajectories from the ERA-Interim and ERA5 reanalyses. The study is motivated by the need for statistically representative sets of high resolution simulations of cloud field evolution in realistic meteorological conditions. The study will serve as a foundation for the investigation of biomass burning effects on the transition from stratocumulus to shallow cumulus clouds in the South-East Atlantic. Trajectories that pass through a location with radiosonde data (St. Helena) and which exhibit a well-defined cloud structure and evolution were identified in satellite imagery, and sea surface temperature and atmospheric vertical profiles along the trajectories were extracted from the reanalysis data sets. The System for Atmospheric Modeling (SAM) simulated boundary layer turbulence and cloud properties along the trajectories. Mean temperature and moisture (in the free troposphere) and mean wind speed (at all levels) were nudged towards the reanalysis data. Atmospheric and cloud properties in the large eddy simulations were compared with those from the reanalysis products, and evaluated with satellite imagery and radiosonde data. Simulations using ERA-Interim data and the higher resolution ERA5 data are contrasted.
West Valley demonstration project: Alternative processes for solidifying the high-level wastes
NASA Astrophysics Data System (ADS)
Holton, L. K.; Larson, D. E.; Partain, W. L.; Treat, R. L.
1981-10-01
Two pretreatment approaches and several waste form processes for radioactive wastes were selected for evaluation. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied.
Laboratory evaluation of flyash treated embankment and base materials : interim report No. 1.
DOT National Transportation Integrated Search
1986-06-01
This study was undertaken to provide the Louisiana DOTD with a data base from which decision-making information can be concerning the modification or stabilization of soils using flyash as a full or partial replacement for hydraulic cement or hydrate...
An evaluation of the short-term effects of the Virginia driver improvement program : interim report.
DOT National Transportation Integrated Search
1981-01-01
This study attempted to determine the impact of the driver improvement program on Virginia's traffic and safety environment in terms of accidents and traffic convictions averted as a result of appropriate treatment, and to establish an ongoing system...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-15
... public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of.... The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of.... Comments are requested to assist in determining the level of analysis and impacts to be considered for...
Minamimoto, Ryogo; Barkhodari, Amir; Harshman, Lauren; Srinivas, Sandy; Quon, Andrew
2016-01-01
Purpose The objective of this study was to prospectively evaluate various quantitative metrics on FDG PET/CT for monitoring sunitinib therapy and predicting prognosis in patients with metastatic renal cell cancer (mRCC). Methods Seventeen patients (mean age: 59.0 ± 11.6) prospectively underwent a baseline FDG PET/CT and interim PET/CT after 2 cycles (12 weeks) of sunitinib therapy. We measured the highest maximum standardized uptake value (SUVmax) of all identified lesions (highest SUVmax), sum of SUVmax with maximum six lesions (sum of SUVmax), total lesion glycolysis (TLG) and metabolic tumor volume (MTV) from baseline PET/CT and interim PET/CT, and the % decrease in highest SUVmax of lesion (%Δ highest SUVmax), the % decrease in sum of SUVmax, the % decrease in TLG (%ΔTLG) and the % decrease in MTV (%ΔMTV) between baseline and interim PET/CT, and the imaging results were validated by clinical follow-up at 12 months after completion of therapy for progression free survival (PFS). Results At 12 month follow-up, 6/17 (35.3%) patients achieved PFS, while 11/17 (64.7%) patients were deemed to have progression of disease or recurrence within the previous 12 months. At baseline, PET/CT demonstrated metabolically active cancer in all cases. Using baseline PET/CT alone, all of the quantitative imaging metrics were predictive of PFS. Using interim PET/CT, the %Δ highest SUVmax, %Δ sum of SUVmax, and %ΔTLG were also predictive of PFS. Otherwise, interim PET/CT showed no significant difference between the two survival groups regardless of the quantitative metric utilized including MTV and TLG. Conclusions Quantitative metabolic measurements on baseline PET/CT appears to be predictive of PFS at 12 months post-therapy in patients scheduled to undergo sunitinib therapy for mRCC. Change between baseline and interim PET/CT also appeared to have prognostic value but otherwise interim PET/CT after 12 weeks of sunitinib did not appear to be predictive of PFS. PMID:27123976
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
On condition evaluation of axle unit bearings of wheel pair
NASA Astrophysics Data System (ADS)
Glotov, V. V.; Romashchenko, M. A.; Ostroumov, I. V.; Kondratiev, Il V.
2018-03-01
At present, axle units of freight cars undergo a complete checkup with disassembling and visual inspection of the bearing parts every five years. During an annual interim checkup, external inspection of an axle box with removed cap is carried out and the lubricant condition is checked. The state of the rolling surfaces of bearings during an interim checkup should be assessed using the known methods of nondestructive testing.
ERIC Educational Resources Information Center
Morris, Mary; And Others
Third in a series of six, this volume reports findings concerning the impact of Project Developmental Continuity (PDC) on the parents of the evaluation study's cohort of children as well as preliminary findings on the relationship between family characteristics and program outcome variables up to the time the children had completed grade 1. Begun…
ERIC Educational Resources Information Center
O'Donnell, Lisa; Bielby, Gill; Golden, Sarah; Morris, Marian; Walker, Matthew; Maguire, Sue
2007-01-01
The Department for Education and Skills (Replace by the Department for Children, Schools and Families as of June 28, 2007) commissioned the National Foundation for Educational Research (NFER) to conduct an evaluation of the Youth Opportunity Fund and Youth Capital Fund (YOF/YCF). This summary presents the main findings from the interim report of…
Interim Report by Asia International Grid Connection Study Group
NASA Astrophysics Data System (ADS)
Omatsu, Ryo
2018-01-01
The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.
Temps at the Top: Factors Related to the Appointment of Interim Community College Presidents
ERIC Educational Resources Information Center
Goff, Susan L.
2012-01-01
The appointment of interim community college presidents, the topic of this study, is a little understood phenomenon. A growing shortage of community college presidents coupled with a lack of replacements suggests the appointment of interims will continue well into the future. This study, with a purpose of looking at the factors related to the…
Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia
2018-07-01
The aim of the present study was to assess the value of interim 18 F-FDG PET/CT performed after the first two cycles of ipilimumab treatment in the prediction of the final clinical response to this type of immunotherapy. The study group comprised 41 patients with unresectable metastatic melanoma scheduled for ipilimumab therapy. Whole-body 18 F-FDG PET/CT was performed before the start of ipilimumab treatment (baseline PET/CT) and after the initial two cycles of ipilimumab treatment (interim PET/CT). Evaluation of patient response to treatment was based on the European Organization for Research and Treatment of Cancer (EORTC) 1999 criteria for PET as well as the recently proposed PET Response Evaluation Criteria for Immunotherapy (PERCIMT). The patients' best clinical response, assessed at a median of 21.4 months (range 6.3-41.9 months) was used as reference. According to their best clinical response, the patients were divided into two groups: those showing clinical benefit (CB) including stable disease, partial response and complete response (31 patients), and those showing no clinical benefit (no-CB including progressive disease (10 patients). According to the EORTC criteria, interim PET/CT demonstrated progressive metabolic disease (PMD) in 20 patients, stable metabolic disease (SMD) in 11 patients, partial metabolic response (PMR) in 8 patients, and complete metabolic response (CMR) in 2 patients. According to the PERCIMT, interim PET/CT demonstrated PMD in 9 patients, SMD in 24 patients, PMR in 6 patients and CMR in 2 patients. On the basis of the interim PET, the patients were divided in a similar manner to the division according to clinical response into those showing metabolic benefit (MB) including SMD, PMR and CMR, and those showing no metabolic benefit (no-MB) including PMD. According to this dichotomization, the EORTC criteria showed a sensitivity (correctly predicting CB) of 64.5%, a specificity (correctly predicting no-CB) of 90.0%, a positive predictive value (PPV) of 95.2%, a negative predictive value (NPV) of 45.0% and an accuracy of 70.7% in predicting best clinical response. The PERCIMT showed a sensitivity of 93.6%, a specificity of 70.0%, a PPV of 90.6%, a NPV of 77.8% and an accuracy of 87.8%. The McNemar test showed that the PERCIMT had a significantly higher sensitivity than EORTC criteria (p = 0.004), while there was no significant difference in specificity (p = 0.5). The agreement between the two sets of criteria was poor (McNemar test p = 0.001, and accordingly kappa = 0.46). The application of the recently proposed PERCIMT to interim 18 F-FDG PET/CT provides a more sensitive predictor of final clinical response to immunotherapy than the application of the EORTC criteria in patients with metastatic melanoma.
2013-01-01
Background This study is to evaluate the predictive value of FDG-PET (PET) in pediatric and adolescent patients suffering from non-Hodgkin lymphoma (pNHL) in comparison to information provided by conventional imaging methods (CIM). Methods Imaging was performed at baseline and at interim (after 2 cycles of chemotherapy). The response assessment in PET was carried out visually and semi-quantitatively, the latter one by use of percentage decrease in SUVmax from baseline to interim (ΔSUVmax). The PET-based results were compared to the findings by CIM. Progression-free survival (PFS) was analyzed using Kaplan-Meier curves (KM) and log-rank test. Results The final study included 16 patients (mean follow-up time, 60.2 months (range, 4.0 to 85.7 months)). Relapse occurred in four patients. Visual PET compared to CIM revealed higher sensitivity (3/4 vs 1/4) and NPV (6/7 vs 10/13), and equal PPV (3/9 vs 1/3), but lower specificity (6/12 vs 10/12) and accuracy (9/16 vs 11/16). False-positive findings in PET at interim were predominantly observed in patients presenting bulky disease (5/6), whereas CIM was true-negative in all of these cases. KM analyses revealed no significant differences in 5-year PFS neither for CIM (76.9% vs 66.7%; p = 0.67) nor for visual PET (85.7% vs 66.7%; p = 0.34) nor for ΔSUVmax (88.9% vs 57.1%; p = 0.12). Conclusions The predictive value of iPET in pediatric patients suffering from NHL was limited due to considerably high amount of false-positive findings, especially in patients suffering from bulky disease. However, due to our limited sample size, final conclusions cannot be drawn and, thus, call for further evaluation of PET in pNHL in larger and more homogenous patient series. PMID:24139528
DOE Office of Scientific and Technical Information (OSTI.GOV)
Halasz, Lia M.; Jacene, Heather A.; Catalano, Paul J.
2012-08-01
Purpose: To evaluate outcomes of patients treated for aggressive non-Hodgkin lymphoma (NHL) with combined modality therapy based on [{sup 18}F]fluoro-2-deoxy-2-D-glucose positron emission tomography (FDG-PET) response. Methods and Materials: We studied 59 patients with aggressive NHL, who received chemotherapy and radiation therapy (RT) from 2001 to 2008. Among them, 83% of patients had stage I/II disease. Patients with B-cell lymphoma received R-CHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone)-based chemotherapy, and 1 patient with anaplastic lymphoma kinase-negative anaplastic T-cell lymphoma received CHOP therapy. Interim and postchemotherapy FDG-PET or FDG-PET/computed tomography (CT) scans were performed for restaging. All patients received consolidated involved-field RT.more » Median RT dose was 36 Gy (range, 28.8-50 Gy). Progression-free survival (PFS) and local control (LC) rates were calculated with and without a negative interim or postchemotherapy FDG-PET scan. Results: Median follow-up was 46.5 months. Thirty-nine patients had negative FDG-PET results by the end of chemotherapy, including 12 patients who had a negative interim FDG-PET scan and no postchemotherapy PET. Twenty patients were FDG-PET-positive, including 7 patients with positive interim FDG-PET and no postchemotherapy FDG-PET scans. The 3-year actuarial PFS rates for patients with negative versus positive FDG-PET scans were 97% and 90%, respectively. The 3-year actuarial LC rates for patients with negative versus positive FDG-PET scans were 100% and 90%, respectively. Conclusions: Patients who had a positive interim or postchemotherapy FDG-PET had a PFS rate of 90% at 3 years after combined modality treatment, suggesting that a large proportion of these patients can be cured with consolidated RT.« less
Henderson, Shelley; Purdie, Colin; Michie, Caroline; Evans, Andrew; Lerski, Richard; Johnston, Marilyn; Vinnicombe, Sarah; Thompson, Alastair M
2017-11-01
To investigate whether interim changes in hetereogeneity (measured using entropy features) on MRI were associated with pathological residual cancer burden (RCB) at final surgery in patients receiving neoadjuvant chemotherapy (NAC) for primary breast cancer. This was a retrospective study of 88 consenting women (age: 30-79 years). Scanning was performed on a 3.0 T MRI scanner prior to NAC (baseline) and after 2-3 cycles of treatment (interim). Entropy was derived from the grey-level co-occurrence matrix, on slice-matched baseline/interim T2-weighted images. Response, assessed using RCB score on surgically resected specimens, was compared statistically with entropy/heterogeneity changes and ROC analysis performed. Association of pCR within each tumour immunophenotype was evaluated. Mean entropy percent differences between examinations, by response category, were: pCR: 32.8%, RCB-I: 10.5%, RCB-II: 9.7% and RCB-III: 3.0%. Association of ultimate pCR with coarse entropy changes between baseline/interim MRI across all lesions yielded 85.2% accuracy (area under ROC curve: 0.845). Excellent sensitivity/specificity was obtained for pCR prediction within each immunophenotype: ER+: 100%/100%; HER2+: 83.3%/95.7%, TNBC: 87.5%/80.0%. Lesion T2 heterogeneity changes are associated with response to NAC using RCB scores, particularly for pCR, and can be useful across all immunophenotypes with good diagnostic accuracy. • Texture analysis provides a means of measuring lesion heterogeneity on MRI images. • Heterogeneity changes between baseline/interim MRI can be linked with ultimate pathological response. • Heterogeneity changes give good diagnostic accuracy of pCR response across all immunophenotypes. • Percentage reduction in heterogeneity is associated with pCR with good accuracy and NPV.
Shimura, Masashi; Maruo, Kazushi; Gosho, Masahiko
2018-04-23
Two-stage designs are widely used to determine whether a clinical trial should be terminated early. In such trials, a maximum likelihood estimate is often adopted to describe the difference in efficacy between the experimental and reference treatments; however, this method is known to display conditional bias. To reduce such bias, a conditional mean-adjusted estimator (CMAE) has been proposed, although the remaining bias may be nonnegligible when a trial is stopped for efficacy at the interim analysis. We propose a new estimator for adjusting the conditional bias of the treatment effect by extending the idea of the CMAE. This estimator is calculated by weighting the maximum likelihood estimate obtained at the interim analysis and the effect size prespecified when calculating the sample size. We evaluate the performance of the proposed estimator through analytical and simulation studies in various settings in which a trial is stopped for efficacy or futility at the interim analysis. We find that the conditional bias of the proposed estimator is smaller than that of the CMAE when the information time at the interim analysis is small. In addition, the mean-squared error of the proposed estimator is also smaller than that of the CMAE. In conclusion, we recommend the use of the proposed estimator for trials that are terminated early for efficacy or futility. Copyright © 2018 John Wiley & Sons, Ltd.
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.
Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
TORRES, T.D.
RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less
A longitudinal medical Spanish program at one US medical school.
Reuland, Daniel S; Frasier, Pamela Y; Slatt, Lisa M; Alemán, Marco A
2008-07-01
Policymakers have recommended recruiting or training (or both) more US physicians who can provide care in Spanish. Few longitudinal medical Spanish programs have been described and evaluated. This study aims to describe development and evaluation of the preclinical phase of a 4-y program designed to graduate physicians who can provide language-concordant care in Spanish. Study was done in one public medical school in southeastern USA. The program targeted intermediate/advanced Spanish speakers. Standardized fluency assessments were used to determine eligibility and evaluate participants' progress. Curriculum included didactic coursework, simulated patients, socio-cultural seminars, clinical skills rotations at sites serving Latinos, service-learning, and international immersion. For the first two cohorts (n = 45) qualitative evaluation identified program improvement opportunities and found participants believed the program helped them maintain their Spanish skills. Mean interim (2-y) speaking proficiency scores were unchanged from baseline: 9.0 versus 8.7 at baseline on 12-point scale (p = 0.15). Mean interim listening comprehension scores (second cohort only, n = 25) increased from a baseline of 77 to 86% (p = 0.003). Proportions "passing" the listening comprehension test increased from 72 to 92% (p = 0.06). We describe development of a longitudinal Spanish program within a medical school. Participation was associated with improved Spanish listening comprehension and no change in speaking proficiency.
Drago, Carl
2016-08-01
The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary prostheses were in place for an average of 202.0 days. Thirty four of the 191 interim prostheses (17.8%) warranted at least one repair during the treatment period. The average overall implant insertion torque value was 60.74 Ncm; mandibular torque values averaged 63.08 Ncm; maxillary torque values averaged 59.00 Ncm. The results from this study suggest that dental arch, gender, and implant orientation for implants placed and immediately restored with interim, all-acrylic resin, full-arch prostheses per the All-on-Four protocol did not have significant statistical or clinical effects on prosthetic complications of the interim prostheses or implant survival. Only one of the 129 patients experienced implant failures, indicating that the All-on-Four treatment protocol used in this study is a viable alternative to other protocols for rehabilitating edentulous patients. © 2015 by the American College of Prosthodontists.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reddy, T.V.; Daniel, F.B.; Olson, G.R.
1996-02-01
Chronic toxic effects of I ,3,5-tnnitriotrobenzene (TNB) in male and female Fischer rats were evaluated by feeding certified powdered laboratory chow diet supplemented with varied concentrations of TNB (0, 5, 60 and 300 mg/kg diet). The study was designed to accommodate three interim sacrifices (10 rats/group/sex) at 90, 180 and 365 days. The final sacrifice was performed after two years. All data related to these interim sacrifices are presented independently in appendices J to L. The calculated average TNB consumption for females was 0.23, 2.68 and 13.31 mg/kg/day and was 0.22, 2.64 and 13.44 mg/kg/day for males. Terminal body weightsmore » were significantly decreased in both sexes in the 300 mg/kg group. Relative spleen weights were decreased in both sexes in the 300 mg/kg group while brain weights were increased in females in this same group. Methemoglobin was increased in both sexes in the 300 mg/kg group while other hematological effects noted at the interim sacrifice times were not evident at two years. Histopathological examinations suggested treatment related changes in both sexes involving the kidneys (cytoplasmic/hyaline droplets) in the 60 and 300 mg/kg groups and the spleen (erythroid cell hyperplasia and pigment deposition) in the 300 mg/kg group. The cytoplasmic/hyaline droplets were characterized by immunohistochemistry as alpha-2u-globulin. These renal droplets were also noted at the interim sacrifice times. A no observed adverse effect level (NOAEL) was established in this study at 2.68 mg/kg b.w./day for F-344 rats administered TNB for two years.« less
Evaluation of experimental flexible pavements : interim report no. 2.
DOT National Transportation Integrated Search
1975-01-01
A program of construction and performance evaluation of seven Virginia flexible pavements containing at least some experimental features is reported. The objective of the program is to evaluate the performance of the pavements incorporating new or ti...
Evaluation of Searching and Rescue (SAR) Method For Determining Local Wind Current
1991-07-01
JUL 10 1992 ("= Research ajJ Development Centerto 1082 Shennecossett Road . - Groton, CT 06340-6096 INTERIM REPORT July 1991 This document is...United States Coast Guard Research and Development Center 1082 Shennecossett Road Groton, CT 06340-6096 V ’C . l •• mU. Technical Report Documentation...Grant No. 1082 Shennecossett Road Groton, Connecticut 06340-6096 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address INTERIM
NASA Astrophysics Data System (ADS)
Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.
2017-12-01
Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.
Linking the Pennsylvania PSSA Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the Pennsylvania System of School Assessment (PSSA) reading and math with those of the…
Linking the North Carolina EOG Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the North Carolina End-of-Grade (EOG) English language arts (ELA) and math with those…
International Trade. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
Gordon, Gerald F.
In order to evaluate the potential effects of U.S. conversion to SI (Systems International) units on U.S. foreign trade, 188 export product classes and 155 import product classes were selected from 1,166 Standard Industrial Classification (SIC) product classes and questionnaires were mailed to a total of 510 firms, utilizing separate forms for…
Pewaukee School District, Wisconsin. Case Study: Measures of Academic Progress
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2015
2015-01-01
For more than a decade, Pewaukee School District Superintendent JoAnn Sternke has watched her district get better and better at its mission: opening the door to each student's future. The Wisconsin district began using Measures of Academic Progress® (MAP®) computer adaptive interim assessments from Northwest Evaluation Association™ (NWEA™) in 2004…
Linking the Virginia SOL Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the Virginia Standards of Learning (SOL) reading and math tests with those of the MAP…
Why Did Principals and Teachers Respond Differently to Curriculum Reform?
ERIC Educational Resources Information Center
Ng, Shun Wing
2009-01-01
This article presents the finding of an interim evaluation survey commissioned by the Education Bureau of Hong Kong on the effectiveness of the curriculum reform initiated in 2001. Drawing upon change theories for analysis of the study, the article examines the perceptions of both principals and teachers on the effectiveness of short-term…
PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY TH
The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less
Publishing interim results of randomised clinical trials in peer-reviewed journals.
Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan
2017-02-01
Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.
Evaluation of the healthy schools program: Part I. Interim progress.
Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C
2012-01-01
Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Evaluation. 30.30-9 Section 30.30-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for Evaluating Vessel Personnel Licensing and Certification Programs of Foreign Countries § 30.30-9 Evaluation. Materials...
DOT National Transportation Integrated Search
2002-08-01
The purpose of this research was to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. The contents of this report reflect an evaluation of the construction of the test sections and a two-year evaluation of the test sect...
Interim Evaluation Results from New Flyer/Allison Hybrid Buses at King County Metro: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chandler, K.; Eberts, E.; Eudy, L.
2005-05-01
This paper prepared for the 2005 American Public Transportation Association Bus & Paratransit Conference discusses NREL/DOE evaluation of hybrid electric articulated transit buses operated by King County Metro.
DOT National Transportation Integrated Search
1987-01-01
The report presents comparisons of initial evaluations of several concrete sealers and multiple layer polymer concrete overlays. The sealers evaluated included a solvent-dlspersed epoxy, a water-dlspersed epoxy, a silane, and a high molecular weight ...
Andrade, Verónica; Martínez, Alejandra; Rojas, Ninón; Bello-Toledo, Helia; Flores, Paulo; Sánchez-Sanhueza, Gabriela; Catalán, Alfonso
2018-05-01
Interim restorations are occasionally left in the mouth for extended periods and are susceptible to bacterial infiltration. Thus, dental interim cements with antibacterial properties are required. The purpose of this in vitro study was to determine in vitro antibacterial activity against Streptococcus mutans and to compare the diametrical tensile strength (DTSs) of dental interim cement modified with zinc oxide nanoparticles (ZnO-NPs) with that of cement modified with terpenes. Antibacterial properties of ZnO-NPs, terpenes, and dental interim cement modified with ZnO-NPs and cement modified with terpenes against S mutans were tested according to minimum inhibitory concentration (MIC) and direct contact inhibition (DCI). Tensile strength levels were evaluated using DTS. Results were analyzed using the Kolmogorov-Smirnov, ANOVA, and Tamhane tests (α=.05). The MICs of ZnO-NPs and terpenes against S mutans were 61.94 μg/g and 0.25% v/v, respectively. The DCI assay under the cylinders of cement (area of contact with the agar surface) revealed significant bacterial growth inhibition on Temp-Bond NE specimens with ZnO-NPs at MIC of 495.2 μg/g (8× MIC) and with terpenes at MIC 0.999% v/v (4× MIC) (P<.05). The Temp-Bond NE cement cylinder (control group) showed the lowest DTS (1.05 ±0.27 MPa) of all other test groups. In the Zn-NPs group, the greatest increase occurred in the NP8 (8× MIC; 495.2 μg/g) group with a value of 1.50 ±0.23 MPa, a significant increase in DTS compared with the control and terpene groups (P<.05). In the terpene group, the highest increase corresponded to group T2 (2× MIC; 0.4995% v/v) with a value of 1.29 ±0.18 MPa. The addition of terpenes and ZnO-NPs to interim cement showed antibacterial activity when in contact with S. mutans ATCC 25175. Both terpenes and ZnO-NPs antimicrobial agents increased diametral tensile strength. Copyright © 2017 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey
ERIC Educational Resources Information Center
Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.
2014-01-01
A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…
Interim Outcomes Assessment of the Comprehensive Clinical Performance Grid for Student Evaluation.
ERIC Educational Resources Information Center
Tolls, Dorothy Bazzinotti; Carlson, Nancy; Wilson, Roger; Richman, Jack
2001-01-01
Assessed the viability of the Comprehensive Clinical Performance Grid for Student Evaluation, introduced at The New England College of Optometry in 1996 in clinical student assessment. Analyzed faculty and student feedback and consistency with previous evaluations, between evaluators, and between clinical sites and tracts. Found satisfaction with…
ERIC Educational Resources Information Center
ERICKSEN, GERALD L.; RYAN, JAMES J.
A REPORT IS GIVEN OF THE FIRST 3 YEARS OF A FIELD STUDY CONDUCTED TO DETERMINE THE EFFECTIVENESS OF SEVERAL PROTOTYPE, SECONDARY MATHEMATICS PROGRAMS THAT WERE PRODUCED BY DIFFERENT CURRICULUM DEVELOPMENT GROUPS. MATHEMATICS TEACHERS WHO HAD NO PREVIOUS EXPERIENCE WITH "MODERN" OR EXPERIMENTAL APPROACHES TO MATHEMATICS TAUGHT A SELECTED…
Fernandez, Hubert H; Pagan, Fernando; Danisi, Fabio; Greeley, David; Jankovic, Joseph; Verma, Amit; Sethi, Kapil; Pappert, Eric J
2013-01-01
We report the interim results from XCiDaBLE, a large, prospective, observational "naturalistic" study evaluating Xeomin® (incobotulinumtoxinA) for Cervical Dystonia or BLEpharospasm in the United States. Subjects (≥ 18 years old) with cervical dystonia (CD) are followed for two treatment cycles and monitored via Interactive Voice/Web Response. The subject's physician must have chosen to treat with incobotulinumtoxinA prior to and independent of enrollment in this study. Subject-reported scales include the Subject Global Impression-Severity and Improvement and Cervical Dystonia Impact Profile (CDIP-58), and Work Productivity and Quality of Life (QoL) are assessed by means of an employment questionnaire and work history and the SF-12v2 Health Survey (SF-12v2). Subjects are seen by the investigator for three visits, which include a baseline visit (including the first injection), a second injection visit, and a final study visit (12 weeks after the second injection). This ongoing study includes 145 subjects with a diagnosis of CD. The majority were female (82.3%) and white (91.0%) and had previously been treated with botulinum toxins (77.2%). There were 106 employed at the time of disease onset, but 12.6 years later only 44% were still employed at the time of enrolment into the study, and 20% were either receiving or seeking disability benefits. The mean total dose/treatment of CD was 225.2 units for the first injection. The CDIP-58 total score was significantly improved 4 weeks after the first injection compared to baseline (p≤0.0001). Most subjects noted improvement in their global impression assessment. No new or unexpected adverse events occurred. The results from these interim analyses confirm previous controlled, single-dose studies of incobotulinumtoxinA in terms of efficacy and safety.
Fernandez, Hubert H.; Pagan, Fernando; Danisi, Fabio; Greeley, David; Jankovic, Joseph; Verma, Amit; Sethi, Kapil; Pappert, Eric J.
2013-01-01
Background We report the interim results from XCiDaBLE, a large, prospective, observational “naturalistic” study evaluating Xeomin® (incobotulinumtoxinA) for Cervical Dystonia or BLEpharospasm in the United States. Methods Subjects (≥ 18 years old) with cervical dystonia (CD) are followed for two treatment cycles and monitored via Interactive Voice/Web Response. The subject's physician must have chosen to treat with incobotulinumtoxinA prior to and independent of enrollment in this study. Subject-reported scales include the Subject Global Impression-Severity and Improvement and Cervical Dystonia Impact Profile (CDIP-58), and Work Productivity and Quality of Life (QoL) are assessed by means of an employment questionnaire and work history and the SF-12v2 Health Survey (SF-12v2). Subjects are seen by the investigator for three visits, which include a baseline visit (including the first injection), a second injection visit, and a final study visit (12 weeks after the second injection). Results This ongoing study includes 145 subjects with a diagnosis of CD. The majority were female (82.3%) and white (91.0%) and had previously been treated with botulinum toxins (77.2%). There were 106 employed at the time of disease onset, but 12.6 years later only 44% were still employed at the time of enrolment into the study, and 20% were either receiving or seeking disability benefits. The mean total dose/treatment of CD was 225.2 units for the first injection. The CDIP-58 total score was significantly improved 4 weeks after the first injection compared to baseline (p≤0.0001). Most subjects noted improvement in their global impression assessment. No new or unexpected adverse events occurred. Discussion The results from these interim analyses confirm previous controlled, single-dose studies of incobotulinumtoxinA in terms of efficacy and safety. PMID:23724362
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
THE PROGRAM FOR BRAIN INJURED CHILDREN IN THE NEW YORK CITY PUBLIC SCHOOLS, AN APPRAISAL.
ERIC Educational Resources Information Center
MOSKOWITZ, SUE
IN 1959, THE TWO EXISTING SPECIAL CLASSES FOR BRAIN INJURED CHILDREN IN NEW YORK CITY WERE EVALUATED BY OBSERVATIONS, EXAMINATION OF THE STUDENTS' MEDICAL AND EDUCATIONAL RECORDS, AND INTERVIEWS WITH TEACHERS, PSYCHOLOGISTS, PSYCHIATRISTS, AND SPEECH AND OTHER SPECIALISTS. RECOMMENDATIONS WERE MADE IN AN INTERIM REPORT. A LONGITUDINAL STUDY WAS…
Linking the New York State NYSTP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the New York State Testing Program (NYSTP) reading and math with those of the MAP…
DOT National Transportation Integrated Search
1978-01-01
This report explains the methods and equipment used to produce fluorescent, impregnated, polished, ultrathin sections of portland cement concrete. These sections are used in the study of the microstructure of concrete and are examined with a microsco...
Review of ride quality technology needs of industry and user groups
NASA Technical Reports Server (NTRS)
Mckenzie, J. R.; Brumaghim, S. H.
1975-01-01
A broad survey of ride quality technology state-of-the-art and a review of user evaluation of this technology were conducted. During the study 17 users of ride quality technology in 10 organizations representing land, marine and air passenger transportation modes were interviewed. Interim results and conclusions of this effort are reported.
Spatiotemporal Evaluation of Reanalysis and In-situ Surface Air Temperature over Ethiopia
NASA Astrophysics Data System (ADS)
Tesfaye, T.
2017-12-01
Tewodros Woldemariam Tesfaye*1, C.T. Dhanya 2,and A.K. Gosain3 1Research Scholar, Department of Civil Engineering, Indian Institute of Technology Delhi, New Delhi-110016, India 2Assistant Professor, Department of Civil Engineering, Indian Institute of Technology Delhi, New Delhi-110016, India 3 Professor, Department of Civil Engineering, Indian Institute of Technology Delhi, New Delhi-110016, India, *e-mail: tewodros2002@gmail.com Abstract: Water resources management and modelling studies are often constrained by the scarcity of observed data, especially of the two major variables i.e., precipitation and temperature. Modellers, hence, rely on reanalysis datasets as a substitute; though its performance heavily vary depending on the data availability and regional characteristics. The present study aims at examining the ability of frequently used reanalysis datasets in capturing the spatiotemporal characteristics of maximum and minimum surface temperatures over Ethiopia and to highlight the biases, if any, in these over Ethiopian region. We considered ERA-Interim, NCEP 2, MERRA and CFSR reanalysis datasets and compared these with temperature observations from 15 synoptic stations spread over Ethiopia. In addition to the long term averages and annual cycle, a critical comparison of various extreme indices such as diurnal temperature range, warm days, warm nights, cool days, cool nights, summer days and tropical nights are also undertaken. Our results indicate that, the performance of CFSR followed by NCEP 2 is better in capturing majority of the aspects. ERA-Interim suffers a huge additive bias in the simulation of various aspects of minimum temperature in all the stations considered; while its performance is better for maximum temperature. The inferior performance of ERA-Interim is noted to be only because of the difficulty in simulating minimum temperature. Key words: ERA Interim; NCEP Reanalysis; MERRA; CFSR; Diurnal temperature range; reanalysis performance.
ERIC Educational Resources Information Center
Immekus, Jason C.; Atitya, Ben
2016-01-01
Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…
Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.
Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay
2018-04-17
In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.
Evaluation of rubber-asphalt chip seal in Oregon : interim report.
DOT National Transportation Integrated Search
1977-05-01
The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...
Evaluation of arterial service patrol programs.
DOT National Transportation Integrated Search
2009-12-01
This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...
Bringing English to Order: A Personal Account of the NCC English Evaluation Project.
ERIC Educational Resources Information Center
Clark, Urszula
1994-01-01
Provides a personal account of Great Britain's National Curriculum Committee's English Evaluation Project based at Warwick University. Describes the way the interim and final results of the committee were used by higher powers. (HB)
Evaluation of Stainless Steel Reinforcement in Bridge Decks.
DOT National Transportation Integrated Search
2007-10-01
This report is a follow up and final report to the report on the Evaluation of Stainless Steel Reinforcement, Construction Report. RDT 03 003. The results of interim testing during the bridges first five years are reported for Missouris...
Evaluation of 3-D laser scanning equipment : 2016 interim report.
DOT National Transportation Integrated Search
2017-05-01
As a follow-up to ICT Project R27-030, Evaluation of 3-D Laser Scanning, this report provides findings of an evaluation of 3-D laser : scanning equipment to determine the tangible costs versus benefits and the manpower savings realized by using the e...
Comparison of futility monitoring guidelines using completed phase III oncology trials.
Zhang, Qiang; Freidlin, Boris; Korn, Edward L; Halabi, Susan; Mandrekar, Sumithra; Dignam, James J
2017-02-01
Futility (inefficacy) interim monitoring is an important component in the conduct of phase III clinical trials, especially in life-threatening diseases. Desirable futility monitoring guidelines allow timely stopping if the new therapy is harmful or if it is unlikely to demonstrate to be sufficiently effective if the trial were to continue to its final analysis. There are a number of analytical approaches that are used to construct futility monitoring boundaries. The most common approaches are based on conditional power, sequential testing of the alternative hypothesis, or sequential confidence intervals. The resulting futility boundaries vary considerably with respect to the level of evidence required for recommending stopping the study. We evaluate the performance of commonly used methods using event histories from completed phase III clinical trials of the Radiation Therapy Oncology Group, Cancer and Leukemia Group B, and North Central Cancer Treatment Group. We considered published superiority phase III trials with survival endpoints initiated after 1990. There are 52 studies available for this analysis from different disease sites. Total sample size and maximum number of events (statistical information) for each study were calculated using protocol-specified effect size, type I and type II error rates. In addition to the common futility approaches, we considered a recently proposed linear inefficacy boundary approach with an early harm look followed by several lack-of-efficacy analyses. For each futility approach, interim test statistics were generated for three schedules with different analysis frequency, and early stopping was recommended if the interim result crossed a futility stopping boundary. For trials not demonstrating superiority, the impact of each rule is summarized as savings on sample size, study duration, and information time scales. For negative studies, our results show that the futility approaches based on testing the alternative hypothesis and repeated confidence interval rules yielded less savings (compared to the other two rules). These boundaries are too conservative, especially during the first half of the study (<50% of information). The conditional power rules are too aggressive during the second half of the study (>50% of information) and may stop a trial even when there is a clinically meaningful treatment effect. The linear inefficacy boundary with three or more interim analyses provided the best results. For positive studies, we demonstrated that none of the futility rules would have stopped the trials. The linear inefficacy boundary futility approach is attractive from statistical, clinical, and logistical standpoints in clinical trials evaluating new anti-cancer agents.
Kahl, L; Patel, J; Layton, M; Binks, M; Hicks, K; Leon, G; Hachulla, E; Machado, D; Staumont-Sallé, D; Dickson, M; Condreay, L; Schifano, L; Zamuner, S; van Vollenhoven, R F
2016-11-01
We aimed to evaluate the pharmacodynamics, efficacy, safety and tolerability of the JAK1 inhibitor GSK2586184 in adults with systemic lupus erythematosus (SLE). In this adaptive, randomized, double-blind, placebo-controlled study, patients received oral GSK2586184 50-400 mg, or placebo twice daily for 12 weeks. Primary endpoints included interferon-mediated messenger RNA transcription over time, changes in Safety of Estrogen in Lupus National Assessment-SLE Disease Activity Index score, and number/severity of adverse events. A pre-specified interim analysis was performed when ≥ 5 patients per group completed 2 weeks of treatment. In total, 84-92% of patients were high baseline expressors of the interferon transcriptional biomarkers evaluated. At interim analysis, GSK2586184 showed no significant effect on mean interferon transcriptional biomarker expression (all panels). The study was declared futile and recruitment was halted at 50 patients. Shortly thereafter, significant safety data were identified, including elevated liver enzymes in six patients (one confirmed and one suspected case of Drug Reaction with Eosinophilia and Systemic Symptoms), leading to immediate dosing cessation. Safety of Estrogen in Lupus National Assessment-SLE Disease Activity Index scores were not analysed due to the small number of patients completing the study. The study futility and safety data described for GSK2586184 do not support further evaluation in patients with SLE. Study identifiers: GSK Study JAK115919; ClinicalTrials.gov identifier: NCT01777256.
Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean
2018-04-30
This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
Pritchett, Yili; Jemiai, Yannis; Chang, Yuchiao; Bhan, Ishir; Agarwal, Rajiv; Zoccali, Carmine; Wanner, Christoph; Lloyd-Jones, Donald; Cannata-Andía, Jorge B; Thompson, Taylor; Appelbaum, Evan; Audhya, Paul; Andress, Dennis; Zhang, Wuyan; Solomon, Scott; Manning, Warren J; Thadhani, Ravi
2011-04-01
Chronic kidney disease is associated with a marked increase in risk for left ventricular hypertrophy and cardiovascular mortality compared with the general population. Therapy with vitamin D receptor activators has been linked with reduced mortality in chronic kidney disease and an improvement in left ventricular hypertrophy in animal studies. PRIMO (Paricalcitol capsules benefits in Renal failure Induced cardia MOrbidity) is a multinational, multicenter randomized controlled trial to assess the effects of paricalcitol (a selective vitamin D receptor activator) on mild to moderate left ventricular hypertrophy in patients with chronic kidney disease. Subjects with mild-moderate chronic kidney disease are randomized to paricalcitol or placebo after confirming left ventricular hypertrophy using a cardiac echocardiogram. Cardiac magnetic resonance imaging is then used to assess left ventricular mass index at baseline, 24 and 48 weeks, which is the primary efficacy endpoint of the study. Because of limited prior data to estimate sample size, a maximum information group sequential design with sample size re-estimation is implemented to allow sample size adjustment based on the nuisance parameter estimated using the interim data. An interim efficacy analysis is planned at a pre-specified time point conditioned on the status of enrollment. The decision to increase sample size depends on the observed treatment effect. A repeated measures analysis model, using available data at Week 24 and 48 with a backup model of an ANCOVA analyzing change from baseline to the final nonmissing observation, are pre-specified to evaluate the treatment effect. Gamma-family of spending function is employed to control family-wise Type I error rate as stopping for success is planned in the interim efficacy analysis. If enrollment is slower than anticipated, the smaller sample size used in the interim efficacy analysis and the greater percent of missing week 48 data might decrease the parameter estimation accuracy, either for the nuisance parameter or for the treatment effect, which might in turn affect the interim decision-making. The application of combining a group sequential design with a sample-size re-estimation in clinical trial design has the potential to improve efficiency and to increase the probability of trial success while ensuring integrity of the study.
Relapsed chronic lymphocytic leukemia retreated with rituximab: interim results of the PERLE study.
Chaoui, Driss; Choquet, Sylvain; Sanhes, Laurence; Mahé, Béatrice; Hacini, Maya; Fitoussi, Olivier; Arkam, Yazid; Orfeuvre, Hubert; Dilhuydy, Marie-Sarah; Barry, Marly; Jourdan, Eric; Dreyfus, Brigitte; Tempescul, Adrian; Leprêtre, Stéphane; Bardet, Aurélie; Leconte, Pierre; Maynadié, Marc; Delmer, Alain
2017-06-01
This prospective non-interventional study assessed the management of relapsed/refractory CLL after one or two treatments with rituximab, and retreatment with a rituximab-based regimen. An interim analysis was performed at the end of the induction period in 192 evaluable patients. Median age was 72 years [35-89], first relapse (55%), and second relapse (45%). Rituximab administered during first (68%), second (92%), or both treatment lines (20%). R-bendamustine administered in 56% of patients, R-purine analogs (21%), and R-alkylating agents (19%). The overall response rate (ORR) was 74.6%, in favor of R-purine analogs (90%), R-bendamustine (75%), and R-alkylating agents (69%). Lower ORR in Del 17p patients (43%) and third time rituximab (31%). Most frequent adverse events were hematological (23% patients) including neutropenia (11%) and infections (12%); grade 3/4 AEs (23% patients), mainly hematological (18%); death during induction treatment (7%). This first large study focusing on relapsed/refractory CLL patients retreated with rituximab-based regimens is still ongoing.
ERIC Educational Resources Information Center
Mitchell, John; Wood, Sarah; Young, Susan
Research was conducted in 2000-01 on the long-term impacts of the 200 projects funded by Australia's Framing the Future in 1999 and of the 250 conducted in 2000. Two main research methodologies (case study investigations and a survey) were used for the study. Case study investigations were conducted with the Deaf Education Network in Sydney; South…
Campuzano-Zuluaga, Germán; Deutsch, Yehuda; Salzberg, Matthew; Gomez, Alexandra; Vargas, Fernando; Elias, Roy; Kwon, Deukwoo; Goodman, Mark; Ikpatt, Offiong F; Chapman, Jennifer R; Watts, Justin; Vega, Francisco; Swords, Ronan
2016-03-01
The presence of >5% blasts at "day 14" (D14), in patients undergoing induction chemotherapy for acute myeloid leukemia (AML) is problematic. It is unclear if a second course of chemotherapy for early persistent disease will alter outcome in these patients. We conducted a retrospective study of AML patients undergoing induction chemotherapy where diagnostic, interim (around day 14), and recovery (days 21-42) bone marrow (BM) evaluations were available for review. Of the 113 patients included in the final analysis, 99 (87.6%) achieved CR at hematologic recovery. At D14, 90 patients (79.6%) had <5% blasts and of these, 87 (96.7%) ultimately achieved CR. At D14, Twenty-three (20.4%) patients had residual leukemia (>5% blasts). Of these, 11 (47.8%) received a second course of chemotherapy (double induction [DI]) and 12 (52.2%) were observed until count recovery (single induction [SI]). No significant difference in CR rates was observed between these two groups (58.3% DI group vs. 45.5% SI group, P value = 0.684). In our analysis, D14 BM evaluation did not uniformly identify patients with primary induction failure. To unequivocally determine the value of a D14 marrow assessment in AML, prospective studies in the context of large cooperative group trials are required. Considering our findings and similar reports from others, we propose that D14 marrow assessment should be individualized, and that other factors, such as cytogenetics and early peripheral blood blast clearance should be considered, to identify patients most likely to benefit from interim disease assessment during AML induction therapy. © 2015 Wiley Periodicals, Inc.
Flight Set 360T004 (STS-30) Insulation Component, Interim Release, Volume 3
NASA Technical Reports Server (NTRS)
Passman, James A.
1989-01-01
The insulation component of the Redesigned Solid Rocket Motor (RSRM) is discussed. The results of all visual evaluations and a thermal safety factor analysis are given. The data contained here supersedes the interim release and the insulation data presented in the Clearfield 10 day report. The objective is to document the postflight condition of the internal and external insulation of nozzle to case joints, the case field joints, the igniter to case joints, and the acreage insulation which made up RSRM-4A and RSRM-4B.
46 CFR 30.30-3 - Evaluation materials.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Evaluation materials. 30.30-3 Section 30.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for... materials. The materials to be submitted for evaluation must include the English text of the following: (a...
ERIC Educational Resources Information Center
Love, John M.; And Others
This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
A probabilistic risk assessment (PRA) was made of the Browns Ferry, Unit 1, nuclear plant as part of the Nuclear Regulatory Commission's Interim Reliability Evaluation Program (IREP). Specific goals of the study were to identify the dominant contributors to core melt, develop a foundation for more extensive use of PRA methods, expand the cadre of experienced PRA practitioners, and apply procedures for extension of IREP analyses to other domestic light water reactors. Event tree and fault tree analyses were used to estimate the frequency of accident sequences initiated by transients and loss of coolant accidents. External events such as floods,more » fires, earthquakes, and sabotage were beyond the scope of this study and were, therefore, excluded. From these sequences, the dominant contributors to probable core melt frequency were chosen. Uncertainty and sensitivity analyses were performed on these sequences to better understand the limitations associated with the estimated sequence frequencies. Dominant sequences were grouped according to common containment failure modes and corresponding release categories on the basis of comparison with analyses of similar designs rather than on the basis of detailed plant-specific calculations.« less
Preventive maintenance study : interim report.
DOT National Transportation Integrated Search
2017-09-01
This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...
A two-stage patient enrichment adaptive design in phase II oncology trials.
Song, James X
2014-01-01
Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.
21 CFR 180.30 - Brominated vegetable oil.
Code of Federal Regulations, 2010 CFR
2010-04-01
... million in the finished beverage, pending the outcome of additional toxicological studies on which... INTERIM BASIS PENDING ADDITIONAL STUDY Specific Requirements for Certain Food Additives § 180.30... used on an interim basis as a stabilizer for flavoring oils used in fruit-flavored beverages, for which...
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
ERIC Educational Resources Information Center
Jung, Steven M.; And Others
Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…
Evaluation of the 5.8-mile highway light system for guidance in fog on Afton Mountain.
DOT National Transportation Integrated Search
1976-01-01
This report presents the results of an evaluation of the 5.8-mile fog guidance light system on I-64 across Afton Mountain. It is a companion to "Interim Report No. 3, Evaluation of Pavement Edge Inset and Low Level Illumination Lights in Fog," which ...
78 FR 49782 - Interim Staff Guidance on Changes During Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
... seven comments on the Draft ISG from the Nuclear Energy Institute (NEI) (ADAMS Accession No. ML12089A019... construction impacts evaluation and the 10 CFR 50.59- like review (including applicability determination..., the construction impacts evaluation and the 10 CFR 50.59 and 10 CFR 50-59-like evaluation (including...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
Predicting moisture-induced damage to asphaltic concrete : field evaluation phase, interim report.
DOT National Transportation Integrated Search
1977-01-01
Virginia is one of seven state and federal agencies participating in a field evaluation of a stripping test method developed under NCHRP Project 4-8 (3), "Predicting Moisture- Induced Damage to Asphaltic Concrete." The test method is being used to ev...
Evaluation of thin epoxy system overlays for concrete bridge decks : interim report No. 1.
DOT National Transportation Integrated Search
1986-05-01
Four epoxy overlay systems were applied to concrete bridge decks in north Louisiana to evaluate their performance as skid resistant surfaces primarily and also as concrete sealers. Dural Flexolith, Poly-Carb Flexogrid, and Con/Chem Cono/Crete were pl...
GPS water vapor and its comparison with radiosonde and ERA-Interim data in Algeria
NASA Astrophysics Data System (ADS)
Namaoui, Houaria; Kahlouche, Salem; Belbachir, Ahmed Hafid; Van Malderen, Roeland; Brenot, Hugues; Pottiaux, Eric
2017-05-01
Remote sensing of atmospheric water vapor using global positioning system (GPS) data has become an effective tool in meteorology, weather forecasting and climate research. This paper presents the estimation of precipitable water (PW) from GPS observations and meteorological data in Algeria, over three stations located at Algiers, Bechar and Tamanrasset. The objective of this study is to analyze the sensitivity of the GPS PW estimates for the three sites to the weighted mean temperature ( T m), obtained separately from two types of T m- T s regression [one general, and one developed specifically for Algeria ( T s stands for surface temperature)], and calculated directly from ERA-Interim data. The results show that the differences in T m are of the order of 18 K, producing differences of 2.01 mm in the final evaluation of PW. A good agreement is found between GPS-PW and PW calculated from radiosondes, with a small mean difference with Vaisala radiosondes. A comparison between GPS and ERA-Interim shows a large difference (4 mm) in the highlands region. This difference is possibly due to the topography. These first results are encouraging, in particular for meteorological applications in this region, with good hope to extend our dataset analysis to a more complete, nationwide coverage over Algeria.
Sample size determination in group-sequential clinical trials with two co-primary endpoints
Asakura, Koko; Hamasaki, Toshimitsu; Sugimoto, Tomoyuki; Hayashi, Kenichi; Evans, Scott R; Sozu, Takashi
2014-01-01
We discuss sample size determination in group-sequential designs with two endpoints as co-primary. We derive the power and sample size within two decision-making frameworks. One is to claim the test intervention’s benefit relative to control when superiority is achieved for the two endpoints at the same interim timepoint of the trial. The other is when the superiority is achieved for the two endpoints at any interim timepoint, not necessarily simultaneously. We evaluate the behaviors of sample size and power with varying design elements and provide a real example to illustrate the proposed sample size methods. In addition, we discuss sample size recalculation based on observed data and evaluate the impact on the power and Type I error rate. PMID:24676799
Computerization of material test data reporting system : interim report.
DOT National Transportation Integrated Search
1973-09-01
This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...
The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions
NASA Technical Reports Server (NTRS)
Kruk, Jeffrey W.
2012-01-01
The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.
Real-time software failure characterization
NASA Technical Reports Server (NTRS)
Dunham, Janet R.; Finelli, George B.
1990-01-01
A series of studies aimed at characterizing the fundamentals of the software failure process has been undertaken as part of a NASA project on the modeling of a real-time aerospace vehicle software reliability. An overview of these studies is provided, and the current study, an investigation of the reliability of aerospace vehicle guidance and control software, is examined. The study approach provides for the collection of life-cycle process data, and for the retention and evaluation of interim software life-cycle products.
ERIC Educational Resources Information Center
Martin, Elizabeth L.; Waag, Wayne L.
A transfer-of-training design was used to evaluate the contributions of simulator training with synergistic six-degrees-of-freedom platform motion to aerobatic skills acquisition in the novice pilot. Thirty-six undergraduate pilot trainees were randomly assigned to one of three treatment groups: motion, no-motion, and control. Those in the control…
Accountability for Educators to Students. July 1, 1972 to June 30, 1973. Interim Evaluation Report.
ERIC Educational Resources Information Center
Saint Elizabeth School District R-4, MO.
The two objectives of this accountability project carried out in St. Elizabeth School District, Mo., were: (a) to increase the average student achievement by at least 5 percent at each level K-12 in the four basic areas of language arts, mathematics, social studies, and science during the 1972-73 school term as measured by scores on the Stanford…
ERIC Educational Resources Information Center
1968
The present report proposes a central computing facility and presents the preliminary specifications for such a system. It is based, in part, on the results of earlier studies by two previous contractors on behalf of the U.S. Office of Education. The recommendations are based upon the present contractors considered evaluation of the earlier…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky
2014-07-01
The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.
ERIC Educational Resources Information Center
Gephart, William J.
The paper discusses the meaning of value and valuing, their roles in evaluation, and the potency of value systems in problem solving logic. Evaluation is defined as a process for facilitating decision making. A decision making situation occurs when there are options which are impossible to treat equivalently, and there is an impact in the…
ERIC Educational Resources Information Center
Calhoun, Dave
Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…
Evaluation of interior and exterior latex paints : interim report No. 3.
DOT National Transportation Integrated Search
1977-11-01
The scope of this project is twofold: : 1. The primary aim of this project is to find a number of highly qualified interior and exterior latex paints. : 2. The secondary aim is to develop, where necessary, suitable methods for the rapid evaluation of...
DOT National Transportation Integrated Search
1992-12-01
The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...
DOT National Transportation Integrated Search
1973-01-01
Various curing and/or protective coatings were evaluated under three conditions: (1) accelerated laboratory freezing and thawing of specimens in 2 percent sodium chloride solution, (2) exposure in an outdoor area of slabs which were subjected to cont...
DOT National Transportation Integrated Search
2002-08-01
The purpose of this research is to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. Ten test sections, 1000 feet long, were constructed on LA 89 in Vermilion Parish. The shrinkage crack mitigation methods being evaluat...
NASA Astrophysics Data System (ADS)
Wegmann, Martin; Dutra, Emanuel; Jacobi, Hans-Werner; Zolina, Olga
2018-06-01
This study uses daily observations and modern reanalyses in order to evaluate reanalysis products over northern Eurasia regarding the spring snow albedo feedback (SAF) during the period from 2000 to 2013. We used the state-of-the-art reanalyses from ERA-Interim/Land and the Modern-Era Retrospective Analysis for Research and Applications version 2 (MERRA-2) as well as an experimental set-up of ERA-Interim/Land with prescribed short grass as land cover to enhance the comparability with the station data while underlining the caveats of comparing in situ observations with gridded data. Snow depth statistics derived from daily station data are well reproduced in all three reanalyses. However day-to-day albedo variability is notably higher at the stations than for any reanalysis product. The ERA-Interim grass set-up shows improved performance when representing albedo variability and generates comparable estimates for the snow albedo in spring. We find that modern reanalyses show a physically consistent representation of SAF, with realistic spatial patterns and area-averaged sensitivity estimates. However, station-based SAF values are significantly higher than in the reanalyses, which is mostly driven by the stronger contrast between snow and snow-free albedo. Switching to grass-only vegetation in ERA-Interim/Land increases the SAF values up to the level of station-based estimates. We found no significant trend in the examined 14-year time series of SAF, but interannual changes of about 0.5 % K-1 in both station-based and reanalysis estimates were derived. This interannual variability is primarily dominated by the variability in the snowmelt sensitivity, which is correctly captured in reanalysis products. Although modern reanalyses perform well for snow variables, efforts should be made to improve the representation of dynamic albedo changes.
Tracking rare orchids (Orchidaceae) in Arizona
Ronald A. Coleman
2001-01-01
Twenty-six native orchid species occur in Arizona, and 14 are considered rare with fewer than 100 occurrences in the state. The author is conducting three studies covering four of the wild orchids: Stenorrhynchos michuacanum, Hexalectris revoluta, Malaxis porphyry, and M. tenuis. The studies are ongoing so only interim results are available. Interim results indicate...
ERIC Educational Resources Information Center
Bailis, Lawrence N.; And Others
An interim evaluation analyzed the first year of operation of the Job Training for the Homeless Demonstration Program (JTHDP). Data were collected from quarterly progress reports and evaluation reports submitted by 32 local JTHDP projects. The projects exceeded planned levels of clients served and achieved other positive outcomes, including…
Evaluation of In Harmony: Year 1. Interim Report
ERIC Educational Resources Information Center
Lord, Pippa; Sharp, Caroline; Dawson, Anneka; Mehta, Palak; White, Richard; Jeffes, Jennifer
2013-01-01
Arts Council England (ACE) commissioned NFER to undertake the national evaluation of the In Harmony social and music education programme 2012-2015. In Harmony is funded by the Department for Education (DfE) and ACE, and is currently being piloted in six areas. The evaluation is investigating the range and extent of impacts on children, families,…
Determination of rainfall losses in Virginia, phase II : interim report.
DOT National Transportation Integrated Search
1981-01-01
This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...
Evaluation of ERA-interim and MERRA Cloudiness in the Southern Oceans
NASA Technical Reports Server (NTRS)
Naud, Catherine M.; Booth, James F.; Del Genio, Anthony D.
2014-01-01
The Southern Ocean cloud cover modeled by the Interim ECMWF Re-Analysis (ERA-Interim) and Modern- Era Retrospective Analysis for Research and Applications (MERRA) reanalyses are compared against Moderate Resolution Imaging Spectroradiometer (MODIS) and Multiangle Imaging Spectroradiometer (MISR) observations. ERA-Interim monthly mean cloud amounts match the observations within 5%, while MERRA significantly underestimates the cloud amount. For a compositing analysis of clouds in warm season extratropical cyclones, both reanalyses show a low bias in cloud cover. They display a larger bias to the west of the cyclones in the region of subsidence behind the cold fronts. This low bias is larger for MERRA than for ERA-Interim. Both MODIS and MISR retrievals indicate that the clouds in this sector are at a low altitude, often composed of liquid, and of a broken nature. The combined CloudSat-Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) cloud profiles confirm these passive observations, but they also reveal that low-level clouds in other parts of the cyclones are also not properly represented in the reanalyses. The two reanalyses are in fairly good agreement for the dynamic and thermodynamic characteristics of the cyclones, suggesting that the cloud, convection, or boundary layer schemes are the problem instead. An examination of the lower-tropospheric stability distribution in the cyclones from both reanalyses suggests that the parameterization of shallow cumulus clouds may contribute in a large part to the problem. However, the differences in the cloud schemes and in particular in the precipitation processes, which may also contribute, cannot be excluded.
Hsueh, Eddy C; DeBloom, James R; Lee, Jonathan; Sussman, Jeffrey J; Covington, Kyle R; Middlebrook, Brooke; Johnson, Clare; Cook, Robert W; Slingluff, Craig L; McMasters, Kelly M
2017-08-29
A 31-gene expression profile (GEP) test that provides risk classification of cutaneous melanoma (CM) patients has been validated in several retrospective studies. The objective of the reported study was a prospective evaluation of the GEP performance in patients enrolled in two clinical registries. Three-hundred twenty two CM patients enrolled in the EXPAND (NCT02355587) and INTEGRATE (NCT02355574) registries met the criteria of age ≥ 16 years, successful GEP result and ≥1 follow-up visit for inclusion in this interim analysis. Primary endpoints were recurrence-free (RFS), distant metastasis-free (DMFS), and overall survival (OS). Median follow-up was 1.5 years for event-free patients. Median age for subjects was 58 years (range 18-87) and median Breslow thickness was 1.2 mm (range 0.2-12.0). Eighty-eight percent (282/322) of cases had stage I/II disease and 74% (237/322) had a SLN biopsy. Seventy-seven percent (248/322) had class 1 molecular profiles. 1.5-year RFS, DMFS, and OS rates were 97 vs. 77%, 99 vs. 89%, and 99 vs. 92% for class 1 vs. class 2, respectively (p < 0.0001 for each). Multivariate Cox regression showed Breslow thickness, mitotic rate, and GEP class to significantly predict recurrence (p < 0.01), while tumor thickness was the only significant predictor of distant metastasis and overall survival in this interim analysis. Interim analysis of patient outcomes from a combined prospective cohort supports the 31-gene GEP's ability to stratify early-stage CM patients into two groups with significantly different metastatic risk. RFS outcomes in this real-world cohort are consistent with previously published analyses with retrospective specimens. GEP testing complements current clinicopathologic features and increases identification of high-risk patients. ClinicalTrials.gov, NCT02355574 and NCT02355587.
The role of the Data and Safety Monitoring Board in a clinical trial: The CRISIS Study
Holubkov, Richard; Casper, T. Charles; Dean, J. Michael; Anand, K. J. S.; Zimmerman, Jerry; Meert, Kathleen L.; Newth, Christopher J. L.; Berger, John; Harrison, Rick; Willson, Douglas F.; Nicholson, Carol
2012-01-01
Objective Randomized clinical trials are commonly overseen by a data and safety monitoring board (DSMB) comprised of experts in medicine, ethics, and biostatistics. DSMB responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. DSMB decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate DSMB oversight into the design, monitoring, and reporting of randomized trials. Design Case study, narrative review. Methods The DSMB’s role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. Findings The NIH-appointed CRISIS DSMB was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested DSMB interim review before opening CRISIS to children below one year of age. The first interim analysis found higher 28-day mortality in one treatment arm. The DSMB maintained trial closure to younger children, and requested a second interim data review six months later. At this second meeting, mortality was no longer of concern, while a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the DSMB elected to examine conditional power, and unmask treatment arm identities. Upon finding somewhat greater efficacy in the placebo arm, the DSMB recommended stopping CRISIS due to futility. Conclusions The design and operating procedures of a multicenter randomized trial must consider a pivotal DSMB role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The DSMB must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups. PMID:23392377
The Challenges in Developing VET Competencies in E-Commerce.
ERIC Educational Resources Information Center
Mitchell, John
A formative evaluation was begun of an innovative project funded by the Australian National Training Authority (ANTA) to develop competencies and qualifications in e-commerce. The formative evaluation was designed to focus on inputs, processes, and interim outputs, identifying both good practice and areas for improvement. Findings to date…
Reading First Implementation Evaluation: Interim Report
ERIC Educational Resources Information Center
Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer
2006-01-01
In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…
DOT National Transportation Integrated Search
1998-01-01
One hundred and fifty-six exposure slabs have been constructed with and without a variety of combinations of corrosion inhibiting admixtures and topically applied inhibitors. To accelerate corrosion one hundred and thirty-six of the slabs were constr...
Estimating trends in atmospheric water vapor and temperature time series over Germany
NASA Astrophysics Data System (ADS)
Alshawaf, Fadwa; Balidakis, Kyriakos; Dick, Galina; Heise, Stefan; Wickert, Jens
2017-08-01
Ground-based GNSS (Global Navigation Satellite System) has efficiently been used since the 1990s as a meteorological observing system. Recently scientists have used GNSS time series of precipitable water vapor (PWV) for climate research. In this work, we compare the temporal trends estimated from GNSS time series with those estimated from European Center for Medium-Range Weather Forecasts (ECMWF) reanalysis (ERA-Interim) data and meteorological measurements. We aim to evaluate climate evolution in Germany by monitoring different atmospheric variables such as temperature and PWV. PWV time series were obtained by three methods: (1) estimated from ground-based GNSS observations using the method of precise point positioning, (2) inferred from ERA-Interim reanalysis data, and (3) determined based on daily in situ measurements of temperature and relative humidity. The other relevant atmospheric parameters are available from surface measurements of meteorological stations or derived from ERA-Interim. The trends are estimated using two methods: the first applies least squares to deseasonalized time series and the second uses the Theil-Sen estimator. The trends estimated at 113 GNSS sites, with 10 to 19 years temporal coverage, vary between -1.5 and 2.3 mm decade-1 with standard deviations below 0.25 mm decade-1. These results were validated by estimating the trends from ERA-Interim data over the same time windows, which show similar values. These values of the trend depend on the length and the variations of the time series. Therefore, to give a mean value of the PWV trend over Germany, we estimated the trends using ERA-Interim spanning from 1991 to 2016 (26 years) at 227 synoptic stations over Germany. The ERA-Interim data show positive PWV trends of 0.33 ± 0.06 mm decade-1 with standard errors below 0.03 mm decade-1. The increment in PWV varies between 4.5 and 6.5 % per degree Celsius rise in temperature, which is comparable to the theoretical rate of the Clausius-Clapeyron equation.
Maegawa, Hiroshi; Tobe, Kazuyuki; Tabuchi, Hiromi; Nakamura, Ichiro
2016-10-01
To evaluate the efficacy and safety of ipragliflozin in real-world clinical practice in Japanese patients with type 2 diabetes. We conducted interim analyses at 3 months of a 3-year prospective study of patients who were first prescribed ipragliflozin between 17 July 2014 and 16 October 2015, and whose data were locked by 16 January 2016. Changes in glycemic control, blood pressure, and laboratory variables from baseline, and incidence of adverse drug reactions (ADRs). Of 11,412 patients initially registered, efficacy and safety data were available for 3481 (30.5%) and 4360 (38.2%) patients, respectively. Hemoglobin A1c and fasting plasma glucose decreased by 0.67% and 28.8 mg/dL, respectively, at 3 months/last assessment (both P < .001) from baseline (8.00% and 166.4 mg/dL, respectively). Blood pressure and lipid levels also improved significantly. There were 258 ADRs in 194 patients. The ADRs included 'renal and urinary disorders' (system organ class) in 110 patients (2.5%). These 3-month interim results indicate that ipragliflozin improved glycemic control, lipids, and blood pressure with low rates of ADRs in Japanese patients with type 2 diabetes in real-world clinical practice. The results were consistent with those of placebo-controlled, randomized clinical trials. Clinicaltrials.gov identifier: NCT02479399.
Marine Biochemistry: A New Interdisciplinary Course for the Interim
ERIC Educational Resources Information Center
Goldberg, Arthur S.
1976-01-01
Discusses an undergraduate course which includes lectures, laboratory, and field trips and is designed for the interim winter semester. The course is interdisciplinary, involving a study of the biochemistry, pharmacology, and physiological significance of compounds from marine flora and fauna. (MLH)
78 FR 78811 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
..., fire at the Chevron refinery that endangered 19 workers and sent more than 15,000 residents to the...-resistant metal alloys. The first interim report also found a failure by Chevron to identify and evaluate...
Safe Passage Data Analysis: Interim Report
DOT National Transportation Integrated Search
1993-04-01
The purpose of this report is to describe quantitatively the costs and benefits of screener : proficiency evaluation and reporting systems (SPEARS) equipment, particularly computer-based : instruction (CBI) systems, compared to current methods of tra...
Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses
Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.
2014-01-01
Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hobbs, D.T.; Davis, J.R.
This report assesses the nuclear criticality safety associated with the decontaminated salt solution after passing through the In-Tank Precipitation (ITP) filters, through the stripper columns and into Tank 50H for interim storage until transfer to the Saltstone facility. The criticality safety basis for the ITP process is documented. Criticality safety in the ITP filtrate has been analyzed under normal and process upset conditions. This report evaluates the potential for criticality due to the precipitation or crystallization of fissionable material from solution and an ITP process filter failure in which insoluble material carryover from salt dissolution is present. It is concludedmore » that no single inadvertent error will cause criticality and that the process will remain subcritical under normal and credible abnormal conditions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoon, Dok Hyun; Cho, Yoojin; Kim, Sang Yoon
2011-09-01
Purpose: Induction chemotherapy (ICT) has been used to select patients for organ preservation and determine subsequent treatments in patients with locally advanced squamous cell carcinoma of the head and neck (LASCCHN). Still, the clinical outcomes of LASCCHN patients who showed response to ICT are heterogeneous. We evaluated the efficacy of interim 18-fluoro-2-deoxy-glucose positron emission tomography (FDG-PET) after ICT in this specific subgroup of LASCCHN patients who achieved partial response (PR) after ICT to predict clinical outcomes after concurrent chemoradiotherapy (CCRT). Methods and Materials: Twenty-one patients with LASCCHN who showed PR to ICT by Response Evaluation Criteria In Solid Tumors beforemore » definitive CCRT were chosen in this retrospective analysis. FDG-PET was performed before and 2-4 weeks after ICT to assess the extent of disease at baseline and the metabolic response to ICT, respectively. We examined the correlation of the metabolic response by the percentage decrease of maximum standardized uptake value (SUVmax) on the primary tumor or lymph node after ICT or a specific threshold of SUVmax on interim FDG-PET with clinical outcomes including complete response (CR) rate to CCRT, progression-free survival (PFS), and overall survival (OS). Results: A SUVmax of 4.8 on interim FDG-PET could predict clinical CR after CCRT (100% vs. 20%, p = 0.001), PFS (median, not reached vs. 8.5 mo, p < 0.001), and OS (median, not reached vs. 12.0 months, p = 0.001) with a median follow-up of 20.3 months in surviving patients. A 65% decrease in SUVmax after ICT from baseline also could predict clinical CR after CCRT (100% vs. 33.3%, p = 0.003), PFS (median, not reached vs. 8.9 months, p < 0.001) and OS (median, not reached vs. 24.4 months, p = 0.001) of the patients. Conclusion: These data suggest that interim FDG-PET after ICT might be a useful determinant to predict clinical outcomes in patients with LASCCHN receiving sequential ICT followed by CCRT.« less
Liesner, R J; Abashidze, M; Aleinikova, O; Altisent, C; Belletrutti, M J; Borel-Derlon, A; Carcao, M; Chambost, H; Chan, A K C; Dubey, L; Ducore, J; Fouzia, N A; Gattens, M; Gruel, Y; Guillet, B; Kavardakova, N; El Khorassani, M; Klukowska, A; Lambert, T; Lohade, S; Sigaud, M; Turea, V; Wu, J K M; Vdovin, V; Pavlova, A; Jansen, M; Belyanskaya, L; Walter, O; Knaub, S; Neufeld, E J
2018-03-01
Nuwiq ® (Human-cl rhFVIII) is a fourth generation recombinant FVIII, produced in a human cell line, without chemical modification or protein fusion. No inhibitors developed in studies with Nuwiq ® in 201 previously treated patients with haemophilia A (HA). The immunogenicity, efficacy and safety of Nuwiq ® in previously untreated patients (PUPs) with severe HA are being assessed in the ongoing NuProtect study. The study, conducted across 38 centres worldwide, is evaluating 110 true PUPs of all ages and ethnicities enrolled for study up to 100 exposure days (EDs) or 5 years maximum. The primary objective is to assess the immunogenicity of Nuwiq ® (inhibitor activity ≥0.6 BU) using the Nijmegen-modified Bethesda assay at a central laboratory. Data for 66 PUPs with ≥20 EDs from a preplanned interim analysis were analysed. High-titre (HT) inhibitors developed in 8 of 66 patients after a median of 11.5 EDs (range 6-24). Five patients developed low-titre inhibitors (4 transient). The cumulative incidence (95% confidence interval) was 12.8% (4.5%, 21.2%) for HT inhibitors and 20.8% (10.7%, 31.0%) for all inhibitors. During inhibitor-free periods, median annualized bleeding rates during prophylaxis were 0 for spontaneous bleeds and 2.40 for all bleeds. Efficacy was rated as "excellent" or "good" in treating 91.8% of bleeds. Efficacy of surgical prophylaxis was "excellent" or "good" for 8 (89%) procedures and "moderate" for 1 (11%). No tolerability concerns were evident. These interim data show a cumulative incidence of 12.8% for HT inhibitors and convincing efficacy and tolerability in PUPs treated with Nuwiq ® . © 2017 The Authors. Haemophilia published by John Wiley & Sons Ltd.
Voils, Corrine I; Levine, Erica; Gierisch, Jennifer M; Pendergast, Jane; Hale, Sarah L; McVay, Megan A; Reed, Shelby D; Yancy, William S; Bennett, Gary; Strawbridge, Elizabeth M; White, Allison C; Shaw, Ryan J
2018-02-01
The obesity epidemic has negative physical, psychological, and financial consequences. Despite the existence of effective behavioral weight loss interventions, many individuals do not achieve adequate weight loss, and most regain lost weight in the year following intervention. We report the rationale and design for a 2×2 factorial study that involves financial incentives for dietary self-monitoring (yes vs. no) and/or interim weight loss (yes vs. no). Outpatients with obesity participate in a 24-week, group-based weight loss intervention. All participants are asked to record their daily dietary and liquid intake on a smartphone application (app) and to weigh themselves daily at home on a study-provided cellular scale. An innovative information technology (IT) solution collates dietary data from the app and weight from the scale. Using these data, an algorithm classifies participants weekly according to whether they met their group's criteria to receive a cash reward ranging from $0 to $30 for dietary self-monitoring and/or interim weight loss. Notice of the reward is provided via text message, and credit is uploaded to a gift card. This pilot study will provide information on the feasibility of using this novel IT solution to provide variable-ratio financial incentives in real time via its effects on recruitment, intervention adherence, retention, and cost. This study will provide the foundation for a comprehensive, adequately-powered, randomized controlled trial to promote short-term weight loss and long-term weight maintenance. If efficacious, this approach could reduce the prevalence, adverse outcomes, and costs of obesity for millions of Americans. Clinicaltrials.gov registration: NCT02691260. Published by Elsevier Inc.
Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 1: Summary and Issues.
ERIC Educational Resources Information Center
CSR, Inc., Washington, DC.
This first volume of the interim report on the Study of New Youth Initiatives in Apprenticeship presents a discussion of site visit findings and implementation issues related to the United States Department of Labor's Apprenticeship-School Linkage Demonstrations. (Volume 2, site visit reports, is available separately as CE 032 792.) Chapter 1…
2015-09-30
Interim PCOD approach. In both of these case studies we relied on expert knowledge to link disturbance to vital rates. In the right whale case study...the Interim Population Consequences of Disturbance ( PCoD ) Approach: Quantifying and Assessing the Effects of UK Offshore Renewable Energy
Nonmanufacturing Businesses. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
Cornog, June R.; Bunten, Elaine D.
In this fifth interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a primary stratified sample of 2,828 nonmanufacturing firms was randomly selected from 28,184 businesses taken from Social Security files, a secondary sample of 2,258 firms was randomly selected for replacement…
Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 2: Site Visit Reports.
ERIC Educational Resources Information Center
CSR, Inc., Washington, DC.
This second volume of the interim report provides detailed case study reports on each of the eight Youth Apprenticeship Projects. (Volume 1, an overview of data from the site visits, is available separately as CE 032 791.) Discussion areas covered in each site visit report are local context/operational environment, administrative information,…
2015-06-23
DISTRIBUTION/AVAILABILITY STATEMENT DISTRIBUTION A 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fighter jets and other aircraft with high specific thrust engines...interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc. 3. DATES COVERED. Indicate the time during which the...State the type of report, such as final, technical, interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc
CBVE: A Study to Measure Its Effectiveness in Kentucky. Final Report. Interim Period 1.
ERIC Educational Resources Information Center
Vincent, Roger D.; Cobb, Robert A.
An interim study was conducted in Kentucky to determine the effectiveness of Competency Based Vocational Education (CBVE) and to compare its effectiveness to that of traditional teaching methodologies. Research surveys of those directly involved in the implementation of CBVE were used to ascertain if CBVE is meeting its self-stated goals.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vuichard, N.; Papale, D.
In this study, exchanges of carbon, water and energy between the land surface and the atmosphere are monitored by eddy covariance technique at the ecosystem level. Currently, the FLUXNET database contains more than 500 registered sites, and up to 250 of them share data (free fair-use data set). Many modelling groups use the FLUXNET data set for evaluating ecosystem models' performance, but this requires uninterrupted time series for the meteorological variables used as input. Because original in situ data often contain gaps, from very short (few hours) up to relatively long (some months) ones, we develop a new and robustmore » method for filling the gaps in meteorological data measured at site level. Our approach has the benefit of making use of continuous data available globally (ERA-Interim) and a high temporal resolution spanning from 1989 to today. These data are, however, not measured at site level, and for this reason a method to downscale and correct the ERA-Interim data is needed. We apply this method to the level 4 data (L4) from the La Thuile collection, freely available after registration under a fair-use policy. The performance of the developed method varies across sites and is also function of the meteorological variable. On average over all sites, applying the bias correction method to the ERA-Interim data reduced the mismatch with the in situ data by 10 to 36 %, depending on the meteorological variable considered. In comparison to the internal variability of the in situ data, the root mean square error (RMSE) between the in situ data and the unbiased ERA-I (ERA-Interim) data remains relatively large (on average over all sites, from 27 to 76 % of the standard deviation of in situ data, depending on the meteorological variable considered). The performance of the method remains poor for the wind speed field, in particular regarding its capacity to conserve a standard deviation similar to the one measured at FLUXNET stations.« less
Vuichard, N.; Papale, D.
2015-07-13
In this study, exchanges of carbon, water and energy between the land surface and the atmosphere are monitored by eddy covariance technique at the ecosystem level. Currently, the FLUXNET database contains more than 500 registered sites, and up to 250 of them share data (free fair-use data set). Many modelling groups use the FLUXNET data set for evaluating ecosystem models' performance, but this requires uninterrupted time series for the meteorological variables used as input. Because original in situ data often contain gaps, from very short (few hours) up to relatively long (some months) ones, we develop a new and robustmore » method for filling the gaps in meteorological data measured at site level. Our approach has the benefit of making use of continuous data available globally (ERA-Interim) and a high temporal resolution spanning from 1989 to today. These data are, however, not measured at site level, and for this reason a method to downscale and correct the ERA-Interim data is needed. We apply this method to the level 4 data (L4) from the La Thuile collection, freely available after registration under a fair-use policy. The performance of the developed method varies across sites and is also function of the meteorological variable. On average over all sites, applying the bias correction method to the ERA-Interim data reduced the mismatch with the in situ data by 10 to 36 %, depending on the meteorological variable considered. In comparison to the internal variability of the in situ data, the root mean square error (RMSE) between the in situ data and the unbiased ERA-I (ERA-Interim) data remains relatively large (on average over all sites, from 27 to 76 % of the standard deviation of in situ data, depending on the meteorological variable considered). The performance of the method remains poor for the wind speed field, in particular regarding its capacity to conserve a standard deviation similar to the one measured at FLUXNET stations.« less
42 CFR 93.401 - Interaction with other offices and interim actions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...
42 CFR 93.401 - Interaction with other offices and interim actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...
42 CFR 93.401 - Interaction with other offices and interim actions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...
42 CFR 93.401 - Interaction with other offices and interim actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...
Response Of Iowa pavements to a tracked agricultural vehicle
DOT National Transportation Integrated Search
2000-12-01
The overall objective of the work summarized in this report and in the interim report was to study the effects of targeted implement-of-husbandry loads. This report is to complement Phase I of this work, which was summarized in the interim report, "R...
2013-03-04
The Food and Drug Administration (FDA or ``we'') is reopening the comment period for the interim final rule entitled "Use of Materials Derived From Cattle in Human Food and Cosmetics'' that published in the Federal Register of July 14, 2004 (69 FR 42256). The interim final rule prohibited the use of certain cattle material to address the potential risk of bovine spongiform encephalopathy (BSE) in human food, including dietary supplements, and cosmetics. In the Federal Register of September 7, 2005 (70 FR 53063), we amended the interim final rule to make changes, including providing that the small intestine of cattle, formerly prohibited cattle material, could be used in human food and cosmetics if the distal ileum was removed by a specified procedure or one that the establishment could demonstrate is equally effective in ensuring complete removal of the distal ileum. Since 2005, peer-reviewed studies have been published showing the presence of infectivity in the proximal ileum, jejunum, ileocecal junction, and colon of cattle with BSE. Therefore, we are reopening the comment period for the interim final rule to give interested parties an opportunity to comment on the new studies concerning infectivity in parts of the small intestine other than the distal ileum.
NASA Technical Reports Server (NTRS)
Pride, R. A.
1978-01-01
Interim results from a number of ongoing, long-term environmental effects programs for composite materials are reported. The flight service experience is evaluated for 142 composite aircraft components after more than five years and one million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at five sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation has been observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
ERIC Educational Resources Information Center
Huang, Vicki
2017-01-01
To the author's knowledge, this is the first Australian study to empirically compare the use of a multiple-choice questionnaire (MCQ) with the use of a written assignment for interim, summative law school assessment. This study also surveyed the same student sample as to what types of assessments are preferred and why. In total, 182 undergraduate…
Health Effects Assessment for Bromomethane
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Health Effects Assessment for Ammonia
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Health Effects Assessment for Acenaphthylene
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Health Effects Assessment for Acrylonitrile
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Evaluation of full depth asphaltic concrete pavements : interim report.
DOT National Transportation Integrated Search
1975-02-01
This report provides a review of the performance and structural characteristics exhibited on two full depth asphaltic concrete pavement projects constructed on the Louisiana interstate system. : The roughness characteristics of both full depth projec...
Regional Climate Model sesitivity to different parameterizations schemes with WRF over Spain
NASA Astrophysics Data System (ADS)
García-Valdecasas Ojeda, Matilde; Raquel Gámiz-Fortis, Sonia; Hidalgo-Muñoz, Jose Manuel; Argüeso, Daniel; Castro-Díez, Yolanda; Jesús Esteban-Parra, María
2015-04-01
The ability of the Weather Research and Forecasting (WRF) model to simulate the regional climate depends on the selection of an adequate combination of parameterization schemes. This study assesses WRF sensitivity to different parameterizations using six different runs that combined three cumulus, two microphysics and three surface/planetary boundary layer schemes in a topographically complex region such as Spain, for the period 1995-1996. Each of the simulations spanned a period of two years, and were carried out at a spatial resolution of 0.088° over a domain encompassing the Iberian Peninsula and nested in the coarser EURO-CORDEX domain (0.44° resolution). The experiments were driven by Interim ECMWF Re-Analysis (ERA-Interim) data. In addition, two different spectral nudging configurations were also analysed. The simulated precipitation and maximum and minimum temperatures from WRF were compared with Spain02 version 4 observational gridded datasets. The comparison was performed at different time scales with the purpose of evaluating the model capability to capture mean values and high-order statistics. ERA-Interim data was also compared with observations to determine the improvement obtained using dynamical downscaling with respect to the driving data. For this purpose, several parameters were analysed by directly comparing grid-points. On the other hand, the observational gridded data were grouped using a multistep regionalization to facilitate the comparison in term of monthly annual cycle and the percentiles of daily values analysed. The results confirm that no configuration performs best, but some combinations that produce better results could be chosen. Concerning temperatures, WRF provides an improvement over ERA-Interim. Overall, model outputs reduce the biases and the RMSE for monthly-mean maximum and minimum temperatures and are higher correlated with observations than ERA-Interim. The analysis shows that the Yonsei University planetary boundary layer scheme is the most appropriate parameterization in term of temperatures because it better describes monthly minimum temperatures and seems to perform well for maximum temperatures. Regarding precipitation, ERA-Interim time series are slightly higher correlated with observations than WRF, but the bias and the RMSE are largely worse. These results also suggest that CAM V.5.1 2-moment 5-class microphysics schemes should not be used due to the computational cost with no apparent gain with respect to simpler schemes such as WRF single-moment 3-class. For the convection scheme, this study suggests that Betts-Miller-Janjic scheme is an appropriate choice due to its robustness and Kain-Fritsch cumulus scheme should not be used over this region. KEY WORDS: Regional climate modelling, physics schemes, parameterizations, WRF. ACKNOWLEDGEMENTS This work has been financed by the projects P11-RNM-7941 (Junta de Andalucía-Spain) and CGL2013-48539-R (MINECO-Spain, FEDER).
NASA Technical Reports Server (NTRS)
Traversi, M.; Piccolo, R.
1980-01-01
Tradeoff study activities and the analysis process used are described with emphasis on (1) review of the alternatives; (2) vehicle architecture; and (3) evaluation of the propulsion system alternatives; interim results are presented for the basic hybrid vehicle characterization; vehicle scheme development; propulsion system power and transmission ratios; vehicle weight; energy consumption and emissions; performance; production costs; reliability, availability and maintainability; life cycle costs, and operational quality. The final vehicle conceptual design is examined.
ERIC Educational Resources Information Center
Anyaso, Hilary Hurd
2009-01-01
The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
Hill, Suzanne; Freemantle, Nick
2003-01-01
Healthcare decision makers and pharmaceutical companies are increasingly using techniques of economic evaluation, particularly modelling, to assist them in their decisions about drug purchasing and drug development. The use of models in other types of policy decisions is also well established. One option, to shorten the time to a purchasing decision, would be for an interim decision for approval for reimbursement to be based on an economic model. Such a system would mainly benefit the drug development process and thus the pharmaceutical industry; however the approach could also lead to poor decision making, unethical marketing and withdrawal of drugs from the consumer. In this article, we consider the option of a two-stage economic appraisal process from the point of view of the seller, the purchaser and the patient and public. Although a two-stage process may offer some advantages in terms of early return on investment and access, there are significant disadvantages in terms of certainty about effects and public policy and expenditure. Until there are better methods of predicting the effectiveness of a new product, it is unlikely that interim decisions can be seen as a reasonable health policy alternative, although it seems likely that industry may continue to lobby for such an approach.
48 CFR 1852.216-77 - Award fee for end item contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...
DOT National Transportation Integrated Search
1999-06-01
Four bridge decks were overlayed and patched and one bridge pier was patched using concrete with and without corrosion inhibiting admixtures. Some concrete surfaces received topically applied corrosion-inhibiting treatments prior to placement of the ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
.... Discussion Uranium recovery facility licensees, including in-situ recovery facilities and conventional... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance AGENCY... Staff Guidance, ``Evaluations of Uranium Recovery Facility Surveys of Radon and Radon Progeny in Air and...
DOT National Transportation Integrated Search
1972-11-01
Report contains a description of the work done to evaluate the capability of the urban mass transit industry to report financial and operating data through a uniform reporting system. Techniques used in the evaluation included a questionnaire survey ...
Pioglitazone (Actos) and bladder cancer: Legal system triumphs over the evidence.
Davidson, Mayer B
2016-08-01
In preclinical studies, pioglitazone was associated with bladder cancer in male rats (but not in female rats, mice dogs or monkeys). Because of this association, the Federal Drug Administration requested a large 10year epidemiological study to evaluate whether there was an association between bladder cancer and exposure to pioglitazone in patients. A 5-year interim report published in 2011 showed no significant association between ever vs never exposure to the drug but a significant association in patients exposed to pioglitazone for >2years. Importantly, the final 10year report did not confirm the 5year interim report finding no association between bladder cancer and pioglitazone, even after >4years of exposure to the drug. However, as would be expected, following the 5-year interim report, many epidemiological studies were carried out and civil litigation lawsuits began to be filed. Of the 23 epidemiological studies that have been published to date, 18 showed no association between bladder cancer and pioglitazone (5 with a combination of rosiglitazone and pioglitazone). Of the five that did show a significant association with pioglitazone, three could not be confirmed in the same population and in one of them there were significantly more risk factors for bladder cancer in the patients exposed to pioglitazone. In the fourth one, a significant association became non-significant when patients >79years were included. In the fifth one, detection bias was a major flaw. Currently, >11,000 legal cases have been filed, many of which claim emotional distress due to the fear of bladder cancer. To limit their legal costs, the pharmaceutical company has established a 2.4 billion dollar settlement pool. So much for evidence-based medicine. Copyright © 2016 Elsevier Inc. All rights reserved.
Stavropoulos, S William; Sing, Ronald F; Elmasri, Fakhir; Silver, Mitchell J; Powell, Alex; Lynch, Frank C; Aal, Ahmed Kamel Abdel; Lansky, Alexandra J; Settlage, Richard A; Muhs, Bart E
2014-10-01
To assess safety and effectiveness of a nitinol retrievable inferior vena cava (IVC) filter in patients who require caval interruption to protect against pulmonary embolism (PE). Two hundred patients with temporary indications for an IVC filter were enrolled in this prospective, multicenter clinical study. Patients undergoing filter implantation were to be followed for 2 years or for 30 days after filter retrieval. At the time of the present interim report, all 200 patients had been enrolled in the study, and 160 had undergone a retrieval attempt or been followed to 6 months with their filter in place. Primary study endpoints included technical and clinical success of filter placement and retrieval. Patients were also evaluated for recurrent PE, new or worsening deep vein thrombosis, and filter migration, fracture, penetration, and tilt. Clinical success of placement was achieved in 94.5% of patients (172 of 182), with a one-sided lower limit of the 95% confidence interval of 90.1%. Technical success rate of filter placement was 99.5%. Technical success rate of retrieval was 97.3%; 108 filters were retrieved in 111 attempts. In two cases, the filter apex could not be engaged with a snare, and one device was engaged but could not be removed. Filter retrievals occurred at a mean indwell time of 165 days (range, 5-632 d). There were no instances of filter fracture, migration, or tilt greater than 15° at the time of retrieval or 6-month follow-up. In this interim report, the nitinol retrievable IVC filter provided protection against pulmonary embolism, and the device could be retrieved with a low rate of complications. Copyright © 2014 SIR. Published by Elsevier Inc. All rights reserved.
17 CFR 210.8-03 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...
7 CFR 1738.21 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...
Castelnuovo, Gianluca; Manzoni, Gian Mauro; Cuzziol, Paola; Cesa, Gian Luca; Corti, Stefania; Tuzzi, Cristina; Villa, Valentina; Liuzzi, Antonio; Petroni, Maria Letizia; Molinari, Enrico
2011-03-04
Obesity increases the risk of many health complications such as hypertension, coronary heart disease and type 2 diabetes, needs long-lasting treatment for effective results and involves high public and private care-costs. Therefore, it is imperative that enduring and low-cost clinical programs for obesity and related co-morbidities are developed and evaluated. Information and communication technologies (ICT) can help clinicians to deliver treatment in a cost-effective and time-saving manner to a large number of obese individuals with co-morbidities. To examine ad interim effectiveness of a 12-month multidisciplinary telecare intervention for weight loss provided to obese patients with type 2 diabetes. A single-center randomized controlled trial (TECNOB study) started in December 2008. At present, 72 obese patients with type 2 diabetes have been recruited and randomly allocated to the TECNOB program (n=37) or to a control condition (n=39). However, only 34 participants have completed at least the 3-month follow-up and have been included in this ad interim analysis. 21 out of them have reached also the 6-month follow-up and 13 have achieved the end of the program. Study is still on-going. All participants attended 1-month inpatient intensive program that involved individualized medical care, diet therapy, physical training and brief psychological counseling. At discharge, participants allocated to the TECNOB program were instructed to use a weight-loss web-site, a web-based videoconference tool, a dietary software installed into their cellular phones and an electronic armband measuring daily steps and energy expenditure. Weight and disordered eating-related behaviors and cognitions (EDI-2) at entry to hospital, at discharge from hospital, at 3,6 and 12 months. Ad interim analysis of data from 34 participants showed no statistically significant difference between groups in weight change at any time-point. However, within-group analysis revealed significant reductions of initial weight at discharge from hospital, at 3 months, at 6 months but not at 12 months. Control group had higher scores in Interpersonal distrust at 12 months. This ad interim findings revealed that the effect of the inpatient treatment was high and probably overwhelmed the effect of the TECNOB intervention. Much statistical power and long-term follow-up may enhance the probability to detect the TECNOB effect over and above the great one exerted by the inpatient program.
ERIC Educational Resources Information Center
Young, Harben Boutourline
This interim report of the Yale Project describes the progress made on the nutrition and growth study of Tunisian children from September 1, 1972 through February 28, 1973. A major part of the report is devoted to the organizational and data collection problems of the longitudinal study, discussed under the following categories: biomedics,…
ERIC Educational Resources Information Center
Bekkink, Marleen Olde; Donders, Rogier; van Muijen, Goos N. P.; Ruiter, Dirk J.
2012-01-01
Until now, positive effects of assessment at a medical curriculum level have not been demonstrated. This study was performed to determine whether an interim assessment, taken during a small group work session of an ongoing biomedical course, results in students' increased performance at the formal course examination. A randomized controlled trial…
NASA Astrophysics Data System (ADS)
Vergados, P.; Mannucci, A. J.; Ao, C. O.; Jiang, J. H.; Su, H.
2015-01-01
The spatial variability of the tropical tropospheric relative humidity (RH) throughout the vertical extent of the troposphere is examined using Global Positioning System Radio Occultation (GPSRO) observations from the Constellation Observing System for Meteorology, Ionosphere and Climate (COSMIC) mission. These high vertical resolution observations capture the detailed structure and moisture budget of the Hadley Cell circulation. We compare the COSMIC observations with the European Center for Medium-range Weather Forecast (ECMWF) Re-Analysis Interim (ERA-Interim) and the Modern-Era Retrospective analysis for Research and Applications (MERRA) climatologies. Qualitatively, the spatial pattern of RH in all data sets matches up remarkably well, capturing distinct features of the general circulation. However, RH discrepancies exist between ERA-Interim and COSMIC data sets, which are noticeable across the tropical boundary layer. Specifically, ERA-Interim shows a drier Inter Tropical Convergence Zone (ITCZ) by 15-20% compared both to COSMIC and MERRA data sets, but this difference decreases with altitude. Unlike ECMWF, MERRA shows an excellent agreement with the COSMIC observations except above 400 hPa, where GPSRO observations capture drier air by 5-10%. RH climatologies were also used to evaluate intraseasonal variability. The results indicate that the tropical middle troposphere at ±5-25° is most sensitive to seasonal variations. COSMIC and MERRA data sets capture the same magnitude of the seasonal variability, but ERA-Interim shows a weaker seasonal fluctuation up to 10% in the middle troposphere inside the dry air subsidence regions of the Hadley Cell. Over the ITCZ, RH varies by maximum 9% between winter and summer.
NASA Astrophysics Data System (ADS)
Vergados, P.; Mannucci, A. J.; Ao, C. O.; Jiang, J. H.; Su, H.
2015-04-01
The spatial variability of the tropical tropospheric relative humidity (RH) throughout the vertical extent of the troposphere is examined using Global Positioning System Radio Occultation (GPSRO) observations from the Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) mission. These high vertical resolution observations capture the detailed structure and moisture budget of the Hadley Cell circulation. We compare the COSMIC observations with the European Center for Medium-range Weather Forecast (ECMWF) Reanalysis Interim (ERA-Interim) and the Modern-Era Retrospective analysis for Research and Applications (MERRA) climatologies. Qualitatively, the spatial pattern of RH in all data sets matches up remarkably well, capturing distinct features of the general circulation. However, RH discrepancies exist between ERA-Interim and COSMIC data sets that are noticeable across the tropical boundary layer. Specifically, ERA-Interim shows a drier Intertropical Convergence Zone (ITCZ) by 15-20% compared to both COSMIC and MERRA data sets, but this difference decreases with altitude. Unlike ECMWF, MERRA shows an excellent agreement with the COSMIC observations except above 400 hPa, where GPSRO observations capture drier air by 5-10%. RH climatologies were also used to evaluate intraseasonal variability. The results indicate that the tropical middle troposphere at ±5-25° is most sensitive to seasonal variations. COSMIC and MERRA data sets capture the same magnitude of the seasonal variability, but ERA-Interim shows a weaker seasonal fluctuation up to 10% in the middle troposphere inside the dry air subsidence regions of the Hadley Cell. Over the ITCZ, RH varies by maximum 9% between winter and summer.
ERIC Educational Resources Information Center
Cook, Desmond L.
This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…
Factors Leading to Effectiveness and Satisfaction in Civil Engineer Information Systems
2008-03-01
recently acquired MySQL in 2008 shortly after Oracle failed to acquire MySQL in 2007. For more information on policy implications concerning the use...individual level serves as the pertinent outcome variable and is used to evaluate and compare information systems in this study. Researchers have found...interim work information management system used by the Civil Engineer Operations Flight. The functions served by this system date back to the late
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Charles R.; Enos, David
2014-09-01
This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of used nuclear fuel. The work involves both characterization of the potential physical and chemical environment on the surface of the storage canisters and how it might evolve through time, and testing to evaluate performance of the canister materials under anticipated storage conditions.
ERIC Educational Resources Information Center
Kinnell, Margaret; Garrod, Penny
This British Library Research and Development Department study assesses current activities and attitudes toward quality management in library and information services (LIS) in the academic sector as well as the commercial/industrial sector. Definitions and types of benchmarking are described, and the relevance of benchmarking to LIS is evaluated.…
Assessment of Proposed Cab Glass Coating for FAA Control Towers
2015-11-16
report would be prepared after the initial coating and evaluation (with sprayed water) and then a final report after the 6 month study period to assess...Distribution A: Approved for public release. AFRL-RH-WP-TR-2015-0074 Assessment of Proposed Cab Glass Coating for FAA Control...REPORT TYPE Interim 3. DATES COVERED (From - To) 30 Jun 2014 – 1 Nov 2015 4. TITLE AND SUBTITLE Assessment of Proposed Cab Glass Coating
47 CFR 51.611 - Interim wholesale rates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...
7 CFR 1735.75 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
A Continuum Approach for Developing School Leaders in an Urban District
ERIC Educational Resources Information Center
Normore, Anthony
2007-01-01
This study examined a four-staged leadership development continuum for school leaders in a large urban school district in the southeastern United States. The program under examination included: LEAD Program; Interim Assistant Principal Program; Intern Principal Program, and; First Year Principal Support/Interim Principal Program. Qualitative…
42 CFR 93.401 - Interaction with other offices and interim actions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC...
NASA Technical Reports Server (NTRS)
Friedl, Randall R. (Editor)
1997-01-01
This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
...: Lynchburg, Virginia. Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of..., Interim Director, Division of Compensation Analysis and Support, National Institute for Occupational...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...: Lawrence Livermore National Laboratory. Location: Livermore, California. Job Titles and/or Job Duties: All... L. Hinnefeld, Interim Director, Office of Compensation Analysis and Support, National Institute for...
HEALTH EFFECTS ASSESSMENT FOR VANADIUM AND COMPOUNDS
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Road weather connected vehicle applications : benefit-cost analysis interim report.
DOT National Transportation Integrated Search
2013-01-01
RWMP is currently engaged in a project to evaluate the potential benefits of road weather connected vehicle applications. Of particular interest are the potential improvements in safety, reductions in travel time, improved travel reliability, reducti...
Updated Health Effects Assessment for Chloroform
This report summarizes and evaluates infornation relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...
Updated Health Effects Assessment for Acetone
This report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...
Experimental use of geogrids as an alternative to gravel placement : interim report - first year.
DOT National Transportation Integrated Search
2001-02-01
With the ongoing demand for improved infrastructure, the Maine Department of : Transportation (MDOT) continues to identify and evaluate new and innovative : construction methods and materials. The Departments Capital Highway Improvement : Program ...
Human factors experiments for data link : interim report 1
DOT National Transportation Integrated Search
1972-11-01
This report discusses three experiments aimed at providing information pertinent to the Data Link Operational Experiments Program. Section 1. describes the evaluation of the WIDCOM, a visual display, and a voice synthesizer for providing ATC informat...
Wave energy resource of Brazil: An analysis from 35 years of ERA-Interim reanalysis data
Araújo, Alex Maurício
2017-01-01
This paper presents a characterization of the wave power resource and an analysis of the wave power output for three (AquaBuoy, Pelamis and Wave Dragon) different wave energy converters (WEC) over the Brazilian offshore. To do so it used a 35 years reanalysis database from the ERA-Interim project. Annual and seasonal statistical analyzes of significant height and energy period were performed, and the directional variability of the incident waves were evaluated. The wave power resource was characterized in terms of the statistical parameters of mean, maximum, 95th percentile and standard deviation, and in terms of the temporal variability coefficients COV, SV e MV. From these analyses, the total annual wave power resource available over the Brazilian offshore was estimated in 89.97 GW, with largest mean wave power of 20.63 kW/m in the southernmost part of the study area. The analysis of the three WEC was based in the annual wave energy output and in the capacity factor. The higher capacity factor was 21.85% for Pelamis device at the southern region of the study area. PMID:28817731
Wave energy resource of Brazil: An analysis from 35 years of ERA-Interim reanalysis data.
Espindola, Rafael Luz; Araújo, Alex Maurício
2017-01-01
This paper presents a characterization of the wave power resource and an analysis of the wave power output for three (AquaBuoy, Pelamis and Wave Dragon) different wave energy converters (WEC) over the Brazilian offshore. To do so it used a 35 years reanalysis database from the ERA-Interim project. Annual and seasonal statistical analyzes of significant height and energy period were performed, and the directional variability of the incident waves were evaluated. The wave power resource was characterized in terms of the statistical parameters of mean, maximum, 95th percentile and standard deviation, and in terms of the temporal variability coefficients COV, SV e MV. From these analyses, the total annual wave power resource available over the Brazilian offshore was estimated in 89.97 GW, with largest mean wave power of 20.63 kW/m in the southernmost part of the study area. The analysis of the three WEC was based in the annual wave energy output and in the capacity factor. The higher capacity factor was 21.85% for Pelamis device at the southern region of the study area.
12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...
Validation of HOAPS- and ERA-Interim precipitation estimates over the ocean
NASA Astrophysics Data System (ADS)
Bumke, Karl; Schröder, Marc; Fennig, Karsten
2014-05-01
Although precipitation is one of the key parameters of the global hydrological cycle there are still large gaps in the global observation networks, especially over the oceans. But the progress in satellite technology has provided the possibility to retrieve global data sets from space, including precipitation. Levizzani et al. (2007) showed that precipitation over the oceans can be derived with sufficient accuracy from passive microwave radiometry. Advances in analysis techniques have also improved our knowledge of the global precipitation. On the other hand, e.g. Andersson et al. (2011) or Pfeifroth et al. (2012) pointed out that even state-of-the-art satellite retrievals and reanalysis data sets still disagree on global or regional precipitation with respect to amounts, patterns, variability or temporal behavior compared to observations. That creates the need for a validation study over data sparse areas. Within this study, a validation of HOAPS-3.0 (Hamburg Ocean Atmosphere Parameters and fluxes from Satellite Data) based precipitation at pixel-level resolution and of ERA-Interim reanalysis data for 1995-1997 is performed mainly over the Atlantic Ocean using information from ship rain gauges and optical disdrometers mounted onboard of research vessels. The satellite and ERA-Interim data are compared to the in situ measurement by the nearest neighbor approach. Therefore, it must be ensured that both observations are related to each other, which can be determined by the decorrelation lengths in space and time. At least a number of 658 precipitation events are at our disposal including 127 snow events. The statistical analysis follows the recommendations given by the World Meteorological Organization (WMO) for dichotomous or binary forecasts (WWRP/WGNE: http://www.cawcr.gov.au/projects/verification/#Methods_for_dichotomous_forecasts). Based on contingency tables a number of statistical parameters like the accuracy, the bias, the false alarm rate, success ratio or hit rate have been computed. Summarized, the results show that HOAPS data agrees well with observations with respect to the frequency of precipitation events while ERA-Interim overestimates considerably the number of precipitation events. Results are similar for rain and snow events. Although it is difficult to compare rain rates directly due to the limited number of collocated events and different spatial resolution, the results suggest a slight underestimation of precipitation rates by HOAPS and an overestimation by ERA-Interim. References Andersson, A., Klepp, C., Fennig, K., Bakan, S., Graßl, H. and495 co-authors. 2011. Evaluation of HOAPS-3 ocean surface freshwater flux components. J. Appl. Meteorol. Climatol. 50, 379-398, doi:10.1175/2010JAMC2341.1. Levizzani, V., Bauer, P. and Turk, F. J.) 2007. Measuring Precipitation from Space, EURAINSAT and the Future. Advances in Global Change Research, Vol. 28, Springer, 724 p. Pfeifroth,U.,R.Mueller, and B.Ahrens, 2012: Evaluation of Satellite-Based and Reanalysis Precipitation Data in the Tropical Pacific, J. of Appl. Meteorology and Climatology 52, 634-644
Interim analysis: A rational approach of decision making in clinical trial.
Kumar, Amal; Chakraborty, Bhaswat S
2016-01-01
Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.
Mullen Conley, Kathleen; Juhl Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2010-01-01
The Kids Identifying and Defeating Stroke (KIDS) project is a 3-year prospective, randomized, controlled, multiethnic school-based intervention study. Project goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic White (NHW) middle school students and their parents. This article describes the design, implementation, and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the sixth, seventh, and eighth grades. Each class session also included a homework assignment that involved the students' parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students' stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls. The authors conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise.
ERIC Educational Resources Information Center
Reed, Deborah K.
2015-01-01
This study explored the data-based decision making of 12 teachers in grades 6-8 who were asked about their perceptions and use of three required interim measures of reading performance: oral reading fluency (ORF), retell, and a benchmark comprised of released state test items. Focus group participants reported they did not believe the benchmark or…
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study authors examined the effects of using "Diagnostic Assessment Tools" ("DAT") on mathematics and reading outcomes for students in Indiana schools during the 2009-10 academic year. "DAT" consists of interim assessment tools--Wireless Generation's mCLASS for students in grades K-2 and CTB/ McGraw-Hill's Acuity…
Space Shuttle Avionics: a Redundant IMU On-Board Checkout and Redundancy Management System
NASA Technical Reports Server (NTRS)
Mckern, R. A.; Brown, D. G.; Dove, D. W.; Gilmore, J. P.; Landey, M. E.; Musoff, H.; Amand, J. S.; Vincent, K. T., Jr.
1972-01-01
A failure detection and isolation philosophy applicable to multiple off-the-shelf gimbaled IMUs are discussed. The equations developed are implemented and evaluated with actual shuttle trajectory simulations. The results of these simulations are presented for both powered and unpowered flight phases and at operational levels of four, three, and two IMUs. A multiple system checkout philosophy is developed and simulation results presented. The final task develops a laboratory test plan and defines the hardware and software requirements to implement an actual multiple system and evaluate the interim study results for space shuttle application.
The role of the Data and Safety Monitoring Board in a clinical trial: the CRISIS study.
Holubkov, Richard; Casper, T Charles; Dean, J Michael; Anand, K J S; Zimmerman, Jerry; Meert, Kathleen L; Newth, Christopher J L; Berger, John; Harrison, Rick; Willson, Douglas F; Nicholson, Carol
2013-05-01
Randomized clinical trials are commonly overseen by a Data and Safety Monitoring Board comprised of experts in medicine, ethics, and biostatistics. Data and Safety Monitoring Board responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. Data and Safety Monitoring Board decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate Data and Safety Monitoring Board oversight into the design, monitoring, and reporting of randomized trials. Case study, narrative review. The Data and Safety Monitoring Board's role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. The National Institutes of Health-appointed CRISIS Data and Safety Monitoring Board was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested Data and Safety Monitoring Board interim review before opening CRISIS to children below 1 yr of age. The first interim analysis found higher 28-day mortality in one treatment arm. The Data and Safety Monitoring Board maintained trial closure to younger children and requested a second interim data review 6 months later. At this second meeting, mortality was no longer of concern, whereas a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the Data and Safety Monitoring Board elected to examine conditional power and unmask treatment arm identities. On finding somewhat greater efficacy in the placebo arm, the Data and Safety Monitoring Board recommended stopping CRISIS due to futility. The design and operating procedures of a multicenter randomized trial must consider a pivotal Data and Safety Monitoring Board role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The Data and Safety Monitoring Board must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups.
Predicting clinical trial results based on announcements of interim analyses
2014-01-01
Background Announcements of interim analyses of a clinical trial convey information about the results beyond the trial’s Data Safety Monitoring Board (DSMB). The amount of information conveyed may be minimal, but the fact that none of the trial’s stopping boundaries has been crossed implies that the experimental therapy is neither extremely effective nor hopeless. Predicting success of the ongoing trial is of interest to the trial’s sponsor, the medical community, pharmaceutical companies, and investors. We determine the probability of trial success by quantifying only the publicly available information from interim analyses of an ongoing trial. We illustrate our method in the context of the National Surgical Adjuvant Breast and Bowel (NSABP) trial, C-08. Methods We simulated trials based on the specifics of the NSABP C-08 protocol that were publicly available. We quantified the uncertainty around the treatment effect using prior weights for the various possibilities in light of other colon cancer studies and other studies of the investigational agent, bevacizumab. We considered alternative prior distributions. Results Subsequent to the trial’s third interim analysis, our predictive probabilities were: that the trial would eventually be successful, 48.0%; would stop for futility, 7.4%; and would continue to completion without statistical significance, 44.5%. The actual trial continued to completion without statistical significance. Conclusions Announcements of interim analyses provide information outside the DSMB’s sphere of confidentiality. This information is potentially helpful to clinical trial prognosticators. ‘Information leakage’ from standard interim analyses such as in NSABP C-08 is conventionally viewed as acceptable even though it may be quite revealing. Whether leakage from more aggressive types of adaptations is acceptable should be assessed at the design stage. PMID:24607270
Retention of long-term interim restorations with sodium fluoride enriched interim cement
NASA Astrophysics Data System (ADS)
Strash, Carolyn
Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.
Stability of Beriplast P fibrin sealant: storage and reconstitution.
Eberhard, Ulrich; Broder, Martin; Witzke, Günther
2006-04-26
This study was performed to investigate the stability of Beriplast P fibrin sealant (FS) across a range of storage conditions, both pre- and post-reconstitution. Storage stability of the FS was evaluated during long-term refrigeration (24 months) with or without interim storage at elevated temperatures (40 degrees C for 1 week and 25 degrees C for 1 and 3 months). Stability of individual FS components was assessed by measuring: fibrinogen content, Factor XIII activity (FXIII), thrombin activity and aprotinin potency. The package integrity of each component was also checked (sterility testing, moisture content and pH). Storage stability was also evaluated by testing the reconstituted product for adhesion (tearing force testing after mixing the solutions) and sterility. Reconstitution stability was evaluated following 3-months' storage, for up to 50 h post-reconstitution using the same tests as for the storage stability investigations. Pre-defined specifications were met for fibrinogen content, Factor XIII activity, and thrombin activity, demonstrating storage stability. Package integrity and the functionality and sterility of the reconstituted product were confirmed throughout. Reconstitution stability was demonstrated for up to 50 h following reconstitution, in terms of both tearing force and sterility tests. In conclusion, the storage stability of Beriplast P was demonstrated over a range of 24-month storage schedules including interim exposure to elevated temperature, and the reconstituted product was stable for up to 50 h.
EPA is approximately 20 months into a project to evaluate the performance of wood coatings as a way to prevent arsenic, chromium and copper exposure from the surfaces of CCA treated wood. Potential dermal exposure, as measured by wipe sampling dislodgeable CCA chemical from wood ...
ERIC Educational Resources Information Center
Hawkins, Evelyn K.; And Others
The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…
ERIC Educational Resources Information Center
Wholeben, Brent E.
This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…
Wheel/Rail Noise and Vibration Control
DOT National Transportation Integrated Search
1974-05-01
Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Manufacturing. Location: Canonsburg, Pennsylvania. Job Titles and/or Job Duties: All employees who worked in any...: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
.... Job Titles and/or Job Duties: All Atomic Weapons Employer employees. Period of Employment: January 1... INFORMATION CONTACT: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
.... Location: Albuquerque, New Mexico. Job Titles and/or Job Duties: All employees who worked within the... CONTACT: Stuart L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National...
Health Effects Assessment for Carbon Tetrachloride (Updated 1989)
This report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analys...
DOT National Transportation Integrated Search
1983-01-01
Epoxy Thermoplastic (ETP) is a recently developed epoxy-resin-based thermoplastic pavement marking material being promoted by the Federal Highway Administration as a possible substitute for conventional traffic paints and thermoplastics. Its reported...
Evaluation of automated flagger assistance devices : interim report.
DOT National Transportation Integrated Search
2017-08-01
Flagger safety is an important issue in work zones due to the proximity of the flagger to traffic. Some strategies for improving flagger safety include slowing down approaching vehicles or removing flaggers from the immediate vicinity of traffic. The...
Evaluation of experimental railroad-highway grade crossings in Louisiana.
DOT National Transportation Integrated Search
1983-08-01
This interim report was prepared to provide a review of the performance of thirty railroad-highway grade crossings installed experimentally in Louisiana between 1970 and 1983. They were constructed of rubber, high-density polyethylene (HDPE) or pre-c...
Evaluation of joint sealant materials : interim report No. 1.
DOT National Transportation Integrated Search
1972-03-01
This report illustrates some of the problems caused by ineffectively sealed joints and points to the great need for properly sealing joints in both concrete pavements and structures. : The principles of design including slab lengths, joint dimensions...
Longitudinal joint treatment : first interim report.
DOT National Transportation Integrated Search
2000-11-01
Maine highways have been showing signs of longitudinal joint failure for a number of : years. In an effort to reduce the amount of joint failures the Maine Department of : Transportation (MDOT) is currently evaluating two projects. One project is mon...
Longitudinal joint treatment : second interim report.
DOT National Transportation Integrated Search
2001-09-01
Maine highways have been showing signs of longitudinal joint failure for a : number of years. In an effort to reduce the amount of joint failures the Maine : Department of Transportation (MDOT) is currently evaluating two projects. One : project is m...
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...
van den Bogert, Cornelis A; Souverein, Patrick C; Brekelmans, Cecile T M; Janssen, Susan W J; Koëter, Gerard H; Leufkens, Hubert G M; Bouter, Lex M
2017-08-01
The objective of the study was to identify the reasons for discontinuation of clinical drug trials and to evaluate whether efficacy-related discontinuations were adequately planned in the trial protocol. All clinical drug trials in the Netherlands, reviewed by institutional review boards in 2007, were followed until December 2015. Data were obtained through the database of the Dutch competent authority (Central Committee on Research Involving Human Subjects [CCMO]) and a questionnaire to the principal investigators. Reasons for trial discontinuation were the primary outcome of the study. Three reasons for discontinuation were analyzed separately: all cause, recruitment failure, and efficacy related (when an interim analysis had demonstrated futility or superiority). Among the efficacy-related discontinuations, we examined whether the data monitoring committee, the stopping rule, and the moment of the interim analysis in the trial progress were specified in the trial protocol. Of the 574 trials, 102 (17.8%) were discontinued. The most common reasons were recruitment failure (33 of 574; 5.7%) and solely efficacy related (30 of 574; 5.2%). Of the efficacy-related discontinuations, 10 of 30 (33.3%) of the trial protocols reported all three aspects in the trial protocol, and 20 of 30 (66.7%) reported at least one aspect in the trial protocol. One out of five clinical drug trials is discontinued before the planned trial end, with recruitment failure and futility as the most common reasons. The target sample size of trials should be feasible, and interim analyses should be adequately described in trial protocols. Copyright © 2017 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
United Nations Economic and Social Council, New York, NY.
This interim report, commissioned by UNICEF, emphasizes the value of nonformal educational programs to educationally deprived rural children and youth in developing countries. The first set of basic findings and recommendations arising from this extensive international research study is presented. Organized into five chapters, the text includes…
Abradable compressor and turbine seals, volume 1. [for turbofan engines
NASA Technical Reports Server (NTRS)
Sundberg, D. V.; Dennis, R. E.; Hurst, L. G.
1979-01-01
The application and advantages of abradable coatings as gas-path seals in a general aviation turbine engine were evaluated for use on the high-pressure compressor, the high-pressure turbine, and the low-pressure turbine shrouds. Topics covered include: (1) the initial selection of candidate materials for interim full-scale engine testing; (2) interim engine testing of the initially selected materials and additional candidate materials; (3) the design of the component required to adapt the hardware to permit full-scale engine testing of the most promising materials; (4) finalization of the fabrication methods used in the manufacture of engine test hardware; and (5) the manufacture of the hardware necessary to support the final full-scale engine tests.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...
Tropospheric delays from GNSS for application in coastal altimetry
NASA Astrophysics Data System (ADS)
Fernandes, M. Joana; Pires, Nelson; Lázaro, Clara; Nunes, Alexandra L.
2013-04-01
In the scope of the development of an improved methodology for the computation of the wet tropospheric correction for coastal altimetry, based on the use of tropospheric delays derived from GNSS (Global Navigation Satellite Systems), various studies have been conducted aiming to improve the estimation, at global scale, of GNSS-derived tropospheric delays.Amongst these studies, two are presented in this paper: (1) a global assessment of zenith total delays (ZTD) determined at international data centres such as EPN (EUREF Permanent Network) and IGS (International GNSS Service) by comparison with ZTD solutions computed at the University of Porto (U.Porto) using state-of-the-art methodologies and ZTD estimated from ERA Interim, the latest reanalysis dataset from ECMWF (European Centre for Medium-Range Weather Forecasts), (2) evaluation of the accuracy of the hydrostatic component of the tropospheric delay (zenith hydrostatic delay, ZHD) estimation from different sources of surface pressure.When compared with ERA Interim, both IGS and U.Porto ZTD are homogeneous with a mean standard deviation of the differences, for all analysed sites, of 12 mm. The U.Porto and IGS ZTD agree within 4 mm (1σ), while for EPN the same result is only valid for the period after November 2006. Before that date, the EPN solutions are slightly degraded and require an adequate correction.Aiming to evaluate the accuracy of ZHD determination from various sources of atmospheric pressure, a study is presented that compares ZHD values determined with in situ measurements of surface pressure at a global set of 63 coastal barometric sites (GNSS stations), the corresponding values obtained from ECMWF operational model, ERA Interim sea level pressure (SLP) and ZHD from the Vienna Mapping Functions 1 (VMF1).Results show that the global grids of sea level pressure provided by ECMWF operational model, either at 0.25° or 0.125° spacing, or the ERA Interim reanalysis product at 1.5°, allow the estimation of the hydrostatic component of the tropospheric delay with an accuracy of 1 to 3 mm at global scale, provided an adequate model for the height dependence of atmospheric pressure is adopted. In comparison, for VMF1 grids provided at 2.5° spacing, although the overall accuracy of ZHD estimation is 2-4 mm in most sites, in regions with high variability and strong seasonal signal in the surface pressure, VMF1 can reveal errors with a clear annual pattern and epochs for which the error exceeds the centimetre level. When used to estimate the wet component of the tropospheric delay (zenith wet delay, ZWD) for coastal altimetry, these errors can translate into errors of similar magnitude in sea level studies.
What a Difference a Day Makes: Change in Memory for Newly Learned Word Forms Over 24 Hours
McGregor, Karla K.
2014-01-01
Purpose This study explored the role of time and retrieval experience in the consolidation of word forms. Method Participants were 106 adults trained on 16 novel word-referent pairs, then tested immediately and 24 hr later for recognition and recall of word forms. In the interim, tests were repeated 2 hr or 12 hr after training, or not at all, thus varying the amount and timing of retrieval experience. Results Recognition accuracy was stable and speed improved over the 24-hr period. But these manifestations of consolidation did not depend on interim retrieval experience; in fact, the 2-hr interim test interfered with improvements in speed. In contrast, the number of word forms recalled increased only with interim retrieval experiences, and the 12-hr interim test was more advantageous to recall than the 2-hr test. Conclusions After a word form is encoded, it can become stronger with time. Retrieval experience can also strengthen the trace, but, if retrieval occurs when the memory is still labile, it can be disruptive. This complex interplay between retrieval experience and time holds implications for measuring learning outcomes and for scheduling practice in classrooms and clinics. PMID:24845578
Opening Plenary Presentations from the Agencies at the 5th ESA Workshop
EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals
DOT National Transportation Integrated Search
2002-08-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... Laboratory. Location: Los Alamos, New Mexico. Job Titles and/or Job Duties: All employees of the Department.... Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-23
..., Massachusetts. Job Titles and/or Job Duties: All employees who worked in any building or area. Period of..., Interim Director, Division of Compensation Analysis and Support, National Institute for Occupational...
Closing Plenary Reports from Breakout Groups at the 5th ESA Workshop
EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals
DOT National Transportation Integrated Search
2004-07-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
Longitudinal joint treatment, interim report - third year, March 2004.
DOT National Transportation Integrated Search
2004-03-01
Maine highways have been showing signs of longitudinal joint failure for a number of years. In an effort : to reduce the amount of joint failures the Maine Department of Transportation (MDOT) is currently : evaluating two projects. One project is mon...
Longitudinal joint treatment, interim report - fourth year, March 2005.
DOT National Transportation Integrated Search
2005-03-01
Maine highways have been showing signs of longitudinal joint failure for a number of years. In an effort : to reduce the amount of joint failures the Maine Department of Transportation (MDOT) is currently : evaluating two projects. One project is mon...
Field testing of hand-held infrared thermography, phase II TPF-5(247) interim report.
DOT National Transportation Integrated Search
2015-12-01
This report describes research completed to develop and implement infrared thermography, a nondestructive evaluation (NDE) : technology for the condition assessment of concrete bridge components. The overall goal of this research was to develop new :...
48 CFR 1509.170-6 - Filing of forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...
[Second Interim Report of the Special Committee of the Trustees of Columbia University.
ERIC Educational Resources Information Center
Columbia Univ., New York, NY.
The Special Committee of the Trustees of Columbia University was appointed "to study and recommend changes in the basic structure of the University." The second interim report contains recommendations of the Committee on the participation of faculty and students in university governance through a proposed University Senate that would replace the…
Designing Their Own: Increasing Urban High School Teacher Capacity for Creating Interim Assessments
ERIC Educational Resources Information Center
Ado, Kathryn
2013-01-01
This case study analyzes and documents factors that affect teacher learning and instructional practices in connection to the design your own (DYO) interim or periodic assessment process at one newly developed high school in New York City. Examining these factors through Riggan and Nabors Olah's (2011) conceptual framework offers insights into the…
Interim Assessment Data: A Case Study on Modifying Instruction Based on Benchmark Feedback
ERIC Educational Resources Information Center
Lange, Tracey M.
2014-01-01
The role of data analysis in the jobs of instructional leaders has become as commonplace as teachers creating lesson plans and taking roll in the classroom. Teachers and building leaders routinely use interim assessment data to develop thoughtful and robust instructional plans that address identified areas of student need. The link between the…
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
NASA Astrophysics Data System (ADS)
Alshawaf, Fadwa; Dick, Galina; Heise, Stefan; Balidakis, Kyriakos; Schmidt, Torsten; Wickert, Jens
2017-04-01
Ground-based GNSS (Global Navigation Satellite Systems) have efficiently been used since the 1990s as a meteorological observing system. Recently scientists used GNSS time series of precipitable water vapor (PWV) for climate research although they may not be sufficiently long. In this work, we compare the trend estimated from GNSS time series with that estimated from European Center for Medium-RangeWeather Forecasts Reanalysis (ERA-Interim) data and meteorological measurements.We aim at evaluating climate evolution in Central Europe by monitoring different atmospheric variables such as temperature and PWV. PWV time series were obtained by three methods: 1) estimated from ground-based GNSS observations using the method of precise point positioning, 2) inferred from ERA-Interim data, and 3) determined based on daily surface measurements of temperature and relative humidity. The other variables are available from surface meteorological stations or received from ERA-Interim. The PWV trend component estimated from GNSS data strongly correlates (>70%) with that estimated from the other data sets. The linear trend is estimated by straight line fitting over 30 years of seasonally-adjusted PWV time series obtained using the meteorological measurements. The results show a positive trend in the PWV time series with an increase of 0.2-0.7 mm/decade with a mean standard deviations of 0.016 mm/decade. In this paper, we present the results at three GNSS stations. The temporal increment of the PWV correlates with the temporal increase in the temperature levels.
ERIC Educational Resources Information Center
Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey
2012-01-01
The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…
Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.
ERIC Educational Resources Information Center
Friedman, Myron; And Others
To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…
ERIC Educational Resources Information Center
Watson, Thomas W.; Zumbro, Patrick A.
The main text of this report consists of a review and evaluation of job enrichment as an approach to job redesign, with implications for Air Force research and application. In addition, two appendixes are included: the first, a supplemental historical discussion; the second, a ninety-six-item annotated bibliography. Specific objectives are to…
Evaluation of New Texas Charter Schools: Second Interim Report (2007-10). Executive Summary
ERIC Educational Resources Information Center
Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine
2011-01-01
The Texas Education Agency (TEA) was awarded Charter School Program (CSP) funding in 2007, and specified that the required evaluation would focus on the experiences and outcomes of new charter schools authorized to begin serving students across 4 school years: 2006-07, 2007-08, 2008-09, and 2009-10. TEA categorizes charter schools in terms of…
National Home Start Evaluation Interim Report VI. Twelve-Month Program Issues, Outcomes and Costs.
ERIC Educational Resources Information Center
Goodrich, Nancy; And Others
This report assesses the progress of the six summative Home Start projects as evaluation families completed their first twelve months of enrollment. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her…
Impact evaluation of Morgantown PRT 1975-1976 ridership: Interim Analysis
DOT National Transportation Integrated Search
1977-06-01
An analysis of the ridership levels of the Morgantown PRT system during its : initial period of operation, the 1975-1976 academic year, is presented. PRT ridership : by day, weekly ridership trends in terms of exogeneous events, the influence of : fe...
DOT National Transportation Integrated Search
2006-10-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation : (MaineDOT) continues to identify and evaluate new and innovative construction methods and materials. : The Departments Collector Highway Improvement Prog...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
.... Job Titles and/or Job Duties: Extruders and Shapes Specialists who worked in the Rod and Shape Mill... L. Hinnefeld, Interim Director, Division of Compensation Analysis and Support, National Institute...
Interim Evaluation of Three Instrumented Bridge Decks in Saco, Montana
DOT National Transportation Integrated Search
2006-06-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...
Texturing of concrete pavements : interim report No. 1.
DOT National Transportation Integrated Search
1975-11-01
The scope of this report is to describe the results obtained during the first twelve-month period of this field research project. It includes the construction of test sections and the evaluation period after the project was opened to traffic. Each te...
DOT National Transportation Integrated Search
1974-01-01
Deflection tests conducted during the construction and shortly after the completion of a large experimental pavement project are reported. Four different pavement designs, as follows, are compared: 1. 6-inch cement stabilized subgrade, 6-inch crushed...
ERIC Educational Resources Information Center
Rosario, Jose; And Others
This volume is the first of a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC) on institutions, classroom staff, parents and children from the time the children entered Head Start through the first grade. PDC was begun in 1974 with the purpose of ensuring that disadvantaged children receive continuous…
ERIC Educational Resources Information Center
Frazier, Don
The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…
A Study of the Transitional Adjustment of a Professional Group to its Altered Role. Interim Report.
ERIC Educational Resources Information Center
Daniels, Morris J.
This interim report discusses the adjustments auditing firms are making as a result of the advent of the computer. Data were obtained from (1) a review of the literature, (2) attendance at professional association meetings, and (3) a series of interviews with accountants. The findings to date indicate that the normative patterns governing the…
Graiff, Lorenzo; Vigolo, Paolo
2012-04-01
Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.
Proficiency Guidance on New State Summative Assessments from NWEA
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2015
2015-01-01
Measures of Academic Progress® (MAP®) computer adaptive interim assessments serve many purposes, from informing instruction to identifying students for intervention to projecting proficiency on state accountability assessments. To make sure its flagship product does the latter, Northwest Evaluation Association™ (NWEA™) routinely conducts studies…
Health Effects Assessment for Hexahydro-1,3,5-Trinitro-1,3,5-Triazine (RDX)
The report summarizes and evaluates information relevant to a preliminary interim assessment of adverse health effects associated with specific chemicals or compounds. The Office of Emergency and Remedial Response (Superfund) uses these documents in preparing cost-benefit analyse...
Using environmental DNA (eDNA) to determine Hellbender distribution : interim report.
DOT National Transportation Integrated Search
2017-03-10
Environmental DNA (eDNA) methods are non-invasive genetic sampling in which DNA from organisms is detected via sampling of water or soil, typically for the purposes of determining the presence or absence of an organism. In this project, we have evalu...
Flyash in continuous reinforced PCC pavement and lean concrete base : interim report.
DOT National Transportation Integrated Search
1986-08-01
The objectives of this test section were: 1) To test and evaluate the physical characteristics of flyash concrete in comparison to non-flyash concrete. Tests will be conducted to see if flyash strength, and if the current specifications for flyash ca...
Evaluation of a drainage blanket in an asphalt shoulder section : interim report.
DOT National Transportation Integrated Search
1974-02-01
The aim of this research project was to develop a permeable, yet stable, hot mix asphaltic drainage system for a typical pavement section. Development of such systems should provide the Department with effective means of draining water from highway b...
Review and evaluation of models that produce trip tables from ground counts : interim report.
DOT National Transportation Integrated Search
1996-01-01
This research effort was motivated by the desires of planning agencies to seek alternative methods of deriving current or base year Origin-Destination (O-D) trip tables without adopting conventional O-D surveys that are expensive, time consuming and ...
DOT National Transportation Integrated Search
1981-11-01
The Louisiana Department of Transportation and Development reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Department's design engineers meet this challenge through proper section design ...
40 CFR 265.93 - Preparation, evaluation, and response.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... determining: (1) Whether hazardous waste or hazardous waste constituents have entered the ground water; (2... water; and (3) The concentrations of hazardous waste or hazardous waste constituents in the ground water...
40 CFR 265.93 - Preparation, evaluation, and response.
Code of Federal Regulations, 2011 CFR
2011-07-01
... WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... determining: (1) Whether hazardous waste or hazardous waste constituents have entered the ground water; (2... water; and (3) The concentrations of hazardous waste or hazardous waste constituents in the ground water...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
Texturing of concrete pavements : interim report No. 3.
DOT National Transportation Integrated Search
1977-08-01
The scope of this report is to describe the results obtained at the end of thirty-six months for the third twelve-month period of this field research project. It includes the construction of test sections and the evaluation period after the project w...
Human Factors Experiments for Data Link : Interim Report No. 3
DOT National Transportation Integrated Search
1973-08-01
The results of three experiments involving eight FAA NAFEC test pilots are reported. Section I describes the evaluation of four prototype Data Link displays in a GAT-1 simulator. While there was lack of agreement among the pilots as to the relative m...
Airland Battle and SOF: A Proposal for an Interim Doctrine for Joint Special Operations
1989-05-19
of having to expand forces and create a viable command, control, communications and intelligence (C31) framework while at 3 the same time developing ... technology , not doctrine, and force development and training that is still driven by the parochial differences between service components. This study does...Fondacaro, USA, 51 pages. This study offers the Aimy’s AirLand Battle doctrine as an interim doctrine for SOFgemployment pending the develop - ment of
Simulation of tropospheric chemistry and aerosols with the climate model EC-Earth
NASA Astrophysics Data System (ADS)
van Noije, T. P. C.; Le Sager, P.; Segers, A. J.; van Velthoven, P. F. J.; Krol, M. C.; Hazeleger, W.; Williams, A. G.; Chambers, S. D.
2014-10-01
We have integrated the atmospheric chemistry and transport model TM5 into the global climate model EC-Earth version 2.4. We present an overview of the TM5 model and the two-way data exchange between TM5 and the IFS model from the European Centre for Medium-Range Weather Forecasts (ECMWF), the atmospheric general circulation model of EC-Earth. In this paper we evaluate the simulation of tropospheric chemistry and aerosols in a one-way coupled configuration. We have carried out a decadal simulation for present-day conditions and calculated chemical budgets and climatologies of tracer concentrations and aerosol optical depth. For comparison we have also performed offline simulations driven by meteorological fields from ECMWF's ERA-Interim reanalysis and output from the EC-Earth model itself. Compared to the offline simulations, the online-coupled system produces more efficient vertical mixing in the troposphere, which reflects an improvement of the treatment of cumulus convection. The chemistry in the EC-Earth simulations is affected by the fact that the current version of EC-Earth produces a cold bias with too dry air in large parts of the troposphere. Compared to the ERA-Interim driven simulation, the oxidizing capacity in EC-Earth is lower in the tropics and higher in the extratropics. The atmospheric lifetime of methane in EC-Earth is 9.4 years, which is 7% longer than the lifetime obtained with ERA-Interim but remains well within the range reported in the literature. We further evaluate the model by comparing the simulated climatologies of surface radon-222 and carbon monoxide, tropospheric and surface ozone, and aerosol optical depth against observational data. The work presented in this study is the first step in the development of EC-Earth into an Earth system model with fully interactive atmospheric chemistry and aerosols.
Gordon H. Reeves; Brian R. Pickard; K. Norman Johnson
2016-01-01
The Aquatic Conservation Strategy (ACS) of the Northwest Forest Plan guides management of riparian and aquatic ecosystems on federal lands in western Oregon, western Washington, and northern California. We applied new scientific findings and tools to evaluate two potential options, A and B, for refining interim riparian reserves to meet ACS goals and likely challenges...
ERIC Educational Resources Information Center
Public Education Association, New York, NY.
This interim report evaluates the implementation of the "House Plan," a plan to create small personalized schools within the 110 large comprehensive high schools in New York (New York) by subdividing all ninth grades into separate units. This evaluation covers only the 37 "dropout prevention" high schools which had been…
Guidance: Interim Municipal Settlement Policy
Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.
NASA Astrophysics Data System (ADS)
Fortkamp, Jonathan C.
Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.
ERIC Educational Resources Information Center
Seftor, Neil S.; Calcagno, Juan Carlos
2010-01-01
This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…
Utsunomiya, Kazunori; Shimmoto, Naoki; Senda, Masayuki; Kurihara, Yuji; Gunji, Ryoji; Kameda, Hiroyuki; Tamura, Masahiro; Mihara, Hanako; Kaku, Kohei
2016-09-01
Sodium-glucose co-transporter 2 inhibitors are a promising treatment for type 2 diabetes mellitus, but are associated with concerns about specific adverse drug reactions. We carried out a 1-year post-marketing surveillance of tofogliflozin, a novel agent in this class, in Japanese elderly patients with type 2 diabetes mellitus and here report the results of a 12-week interim analysis, focusing on adverse drug reactions of special interest. The present prospective observational study included all type 2 diabetes mellitus patients aged ≥65 years who started tofogliflozin during the first 3 months after its launch. Data on demographic and baseline characteristics, clinical course and adverse events were collected. Of 1,535 patients registered, 1,506 patients whose electronic case report forms were collected and who had at least one follow-up visit were included in the safety analysis at 12 weeks. A total of 178 of 1,506 patients (11.82%) had at least one adverse drug reaction to tofogliflozin. The incidence of adverse drug reactions of special interest (polyuria/pollakiuria, volume depletion-related events, urinary tract infection, genital infection, skin disorders and hypoglycemia) was 2.19, 2.32, 1.33, 1.13, 1.46 and 0.73%, respectively. No new safety concerns were identified. Among those evaluable for clinical effectiveness, the mean (standard deviation) glycated hemoglobin decreased from 7.65% (1.35%) at baseline to 7.25% (1.16%) at 12 weeks by 0.39% (0.94%; P < 0.0001). This interim analysis characterized the safety profile of tofogliflozin in Japanese elderly patients with type 2 diabetes mellitus during the early post-marketing period. © 2016 The Authors. Journal of Diabetes Investigation published by Asian Association for the Study of Diabetes (AASD) and John Wiley & Sons Australia, Ltd.
5 CFR 1315.9 - Required documentation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... following delivery to inspect and/or test goods furnished or to evaluate services performed is stated; (6... later than the first request for payment; (9) If using Fast Payment, the proper FAR clause stipulating Fast Payment is required. (b)(1) Except for interim payment requests under cost-reimbursement service...
DOT National Transportation Integrated Search
1981-12-01
Construction and short-term pavement performance problems were noted in the Pacific Northwest and throughout the United States during the past five years. Several reasons have been suggested to explain this sudden change in pavement performance, such...
DOT National Transportation Integrated Search
1978-03-01
Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...
DOT National Transportation Integrated Search
1977-03-01
Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...
2015 NWEA Measures of Academic Progress Normative Data
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2015
2015-01-01
By using carefully constructed measurement scales that span grades, Measures of Academic Progress (MAP) interim assessments from Northwest Evaluation Association™ (NWEA™) offer educators efficient and very accurate estimates of student achievement status within a subject. Before achievement test scores can be useful to educators, however, they…
DOT National Transportation Integrated Search
1984-01-01
Results of usual tests for specification compliance and special tests to show viscosity-temperature susceptibility and ductility penetration relationships for asphalts supplied for use by the Virginia Department of Highways and Transportation in 1983...
Fatigue and shear behavior of HPC bulb-tee girders : interim report.
DOT National Transportation Integrated Search
2003-10-01
Three 96-ft (29.3-m) long, 72-in. (1.83-m) deep, precast, pretensioned bulb-tee girders were tested to evaluate behavior under flexural fatigue and static shear loadings. The three girders had a design concrete compressive strength of 10,000 psi (69....
Conley, Kathleen M; Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2009-01-01
The KIDS (Kids Identifying and Defeating Stroke) Program is a three-year prospective, randomized, controlled, multiethnic school-based intervention study. Program goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic white (NHW) middle school students and their parents. This article describes the design, implementation and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the 6th, 7th, and 8th grades. Each class session also included a homework assignment that involved the students’ parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students’ stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls (p<0.001). We conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise. PMID:18332150
Immunotherapy for recurrent malignant glioma: an interim report on survival.
Ingram, M; Buckwalter, J G; Jacques, D B; Freshwater, D B; Abts, R M; Techy, G B; Miyagi, K; Shelden, C H; Rand, R W; English, L W
1990-12-01
We present interim survival data for a group of 83 adult patients with recurrent malignant glioma treated by implanting stimulated autologous lymphocytes into the tumour bed following surgical debulking. The patients were treated 6 months or more prior to data analysis. Fifty-nine patients were male and 24 female. The mean age for the entire group was 48.4 years and the mean Karnofsky rating (KR) was 67.2. Eight of the patients had grade II tumours, 33 had grade III tumours and 42 had grade IV tumours. Statistical analysis focuses on tumour grade, KR and patient age, factors that have been shown to affect survival in previous studies. Multifactorial analyses are employed to identify interrelationships among factors related to survival. Seven patients (8%) did not respond to immunotherapy, 76 (92%) had a good initial response. Twenty-five patients (30.1%) are living and 18 (22%) have shown no evidence of recurrence. Results are evaluated in the light of those obtained in trials of other experimental therapies for recurrent malignant gliomas. It is concluded that the present protocol offers a safe and comparatively effective treatment option.
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
76 FR 4369 - Special Law Enforcement Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
Does integrated care lead to both improved service quality and lower care cost
Waldeyer, Regina; Siegel, Achim; Daul, Gisela; Gaiser, Karin; Hildebrandt, Helmut; Köster, Ingrid; Schubert, Ingrid; Stunder, Brigitte; Stützle, Yvonne
2010-01-01
Purpose and context ‘Gesundes Kinzigtal’ is one of the few population-based integrated care approaches in Germany, organising care across all health service sectors and indications. The management company and its contracting partners (the physicians’ network in the region and two statutory health insurers) strive to reach a higher quality of care at a lower overall cost as compared with the German standard. During its first two years of operation (2006–2007), the Kinzigtal project achieved surprisingly positive financial results compared with its reference value. To gain independent evidence on the quality aspects of the system, the management company and its partners provided a remarkable budget for its evaluation by independent scientific institutions. Case description and data sources We will present interim results of a population-based controlled cohort study. In this study, quality of care is checked by relying on health and service quality indicators that have been constructed from health insurers’ administrative data (claims data). Interim results are presented for the intervention region (Kinzigtal area) and the control region (the rest of Baden-Württemberg, i.e., Southwest Germany). Preliminary conclusions and discussion The evaluation of ‘Gesundes Kinzigtal’ is in full progress. Until now, there is no evidence that the surprisingly positive financial results of the Kinzigtal system have been achieved at the expense of care quality. Rather, Gesundes Kinzigtal Integrated Care seems to be about to increasingly realize comparative advantages regarding health service quality (in comparison to the control region).
Jensen, Arna-Lee; Abbott, Paul V
2007-10-01
The purpose of this study was to design an experimental model that allowed extensive endodontic interim restorations to be tested for dye penetration while under simulated masticatory load. Extracted premolar teeth had standardized mesio-occluso-distal cavities prepared, and the root canals were instrumented. A cotton wool pellet was placed in the pulp chamber, and the cavities were restored with Cavit, IRM, Ketac-Fil Plus, Ketac-Silver, or composite resin (Z100). They were subjected to the equivalent of 3 months of clinical load while exposed to methylene blue dye. Results of this study could not support IRM as a suitable interim endodontic restorative material to use in extensive cavities. The dye penetration in the Ketac-Fil Plus and Ketac-Silver specimens was not predictable, and the results suggested Cavit and Z100 composite resin require further investigations as potentially useful materials for this purpose.
42 CFR 417.574 - Interim settlement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
10 CFR 590.403 - Emergency interim orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...
49 CFR 37.193 - Interim service requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...
76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
Energy policy act transportation study: Interim report on natural gas flows and rates
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-17
This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less
NASA Astrophysics Data System (ADS)
José González-Rojí, Santos; Wilby, Robert L.; Sáenz, Jon; Ibarra-Berastegi, Gabriel
2017-04-01
Downscaling via the Statistical DownScaling Model (SDSM) version 5.2 and two different configurations of the dynamical WRF model (with and without 3DVAR data assimilation) was evaluated for the estimation of daily precipitation over 21 sites across the Iberian Peninsula during the period 2010-2014. Six different strategies were used to calibrate the SDSM model. These options cover (1) use of NCEP/NCAR R1 Reanalysis and (2) ERA Interim data for downscaling predictor variables calibrated with data from periods (3) 1948-2009 (NCEP/NCAR R1) and (4) 1979-2009 (NCEP/NCAR R1 and ERA Interim). Additionally, for the ERA Interim case, two different grid resolutions have been used, (5) 2.5° and (6) 0.75°. On the other side, for the NCEP/NCAR R1 case, only the 2.5° resolution has been used. Configuring the SDSM model in this way allows testing the sensitivity of the results to different origins of the predictors, fit to different calibration periods and use of different reanalysis resolutions. On the other hand, ERA Interim data at the highest resolution was used as the initial/boundary conditions to run WRF simulations with a 15 km x 15 km horizontal resolution over the Iberian Peninsula, for two different configurations. The first experiment (N) was run using the same configuration typically used for numerical downscaling, with information being fed through the boundaries of the domain. The second experiment (D) was run using 3DVAR data assimilation at 00UTC, 06UTC, 12UTC and 18UTC. In both cases, WRF simulations were run over the period 2009-2014, using the first year (2009) as spin-up for the soil model. Results from the WRF N and D runs and comparable SDSM set up for the period 2010-2014 were evaluated using observations from ECA and E-OBS datasets. In each case, model skill was assessed using seven daily precipitation metrics (absolute mean, wet-day intensity, 90th percentile, maximum 5-day total, maximum number of consecutive dry days, fraction of total from heavy events and number of heavy events defined here as values over the threshold of 90th percentile. Our results show that the SDSM model improves its behaviour when using predictors from the ERA Interim Reanalysis. Improvements are even more impressive when using the 0.75° resolution for ERA Interim. Better results than using WRF D are obtained with this configuration of the SDSM model for mean precipitation and precipitation intensity. Overall, the analysis reveals the extent to which the skill of SDSM can be improved through judicious choice of downscaling predictor source, grid resolution and calibration period. Moreover, the computationally efficient SDSM tool can achieve comparable skill to WRF over a range of precipitation metrics and the contrasting rainfall regimes of the Iberian Peninsula.
Coastal Low-Level Wind Jets: A Global Study Based On An Ensemble Of Reanalysis
NASA Astrophysics Data System (ADS)
Cardoso, R. M.; Lima, D. C. A.; Soares, P. M. M.; Semedo, A.
2017-12-01
Reanalyses data are a useful tool for climate and atmospheric studies since they provide physically consistent spatial and temporal information of observable and unobservable atmospheric parameters. Here, we propose the analysis of coastal low-level jets (CLLJs) resorting to three global reanalyses. The six hourly data from the European Centre for Medium-Range Weather Forecasts (ECMWF) Interim Reanalysis (ERA-Interim), the Japanese 55-year Reanalysis (JRA-55) and the Modern Era Retrospective-analysis for Research and Applications (MERRA2), are used to build an ensemble of reanalyses, for a period encompassing 1980-2016. A detailed global climatology of CLLJs is presented based on a reanalyses ensemble. This gives robustness to the CLLJs representation and also reduces uncertainty. The annual and diurnal cycle as well as the inter-annual variability are analysed in order to evaluate the temporal fluctuations of frequency of occurrence of CLLJ. The ensemble mean displays a good representation of their seasonal spatial variability. The Oman and Benguela CLLJs show, respectively, a decrease and increase of frequency of occurrence, which is statistically significant during boreal summer and austral spring for the period of study. The Oman CLLJ is the most intense and occurs in higher altitudes when compared with the other jets occurring during the season where each CLLJs have higher mean incidence.
NASA Astrophysics Data System (ADS)
Ries, H.; Moseley, C.; Haensler, A.
2012-04-01
Reanalyses depict the state of the atmosphere as a best fit in space and time of many atmospheric observations in a physically consistent way. By essentially solving the data assimilation problem in a very accurate manner, reanalysis results can be used as reference for model evaluation procedures and as forcing data sets for different model applications. However, the spatial resolution of the most common and accepted reanalysis data sets (e.g. JRA25, ERA-Interim) ranges from approximately 124 km to 80 km. This resolution is too coarse to simulate certain small scale processes often associated with extreme events. In addition, many models need higher resolved forcing data ( e.g. land-surface models, tools for identifying and assessing hydrological extremes). Therefore we downscaled the ERA-Interim reanalysis over the EURO-CORDEX-Domain for the time period 1989 to 2008 to a horizontal resolution of approximately 12 km. The downscaling is performed by nudging REMO-simulations to lower and lateral boundary conditions of the reanalysis, and by re-initializing the model every 24 hours ("REMO in forecast mode"). In this study the three following questions will be addressed: 1.) Does the REMO poor man's reanalysis meet the needs (accuracy, extreme value distribution) in validation and forcing? 2.) What lessons can be learned about the model used for downscaling? As REMO is used as a pure downscaling procedure, any systematic deviations from ERA-Interim result from poor process modelling but not from predictability limitations. 3.) How much small scale information generated by the downscaling model is lost with frequent initializations? A comparison to a simulation that is performed in climate mode will be presented.
Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny
2015-01-01
Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.
SNF Interim Storage Canister Corrosion and Surface Environment Investigations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Charles R.; Enos, David G.
2015-09-01
This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be presentmore » through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.« less
78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...
78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
Rampy, L. W.; Quast, J. F.; Humiston, C. G.; Balmer, M. F.; Schwetz, B. A.
1977-01-01
Male and female Sprague-Dawley rats were exposed to vinylidene chloride (VDC) orally or by inhalation in 2-year toxicological studies. Interim results are included in this report. VDC was given in the drinking water at mean ± S.D. concentrations of 0, 68 ± 13, 106 ± 22, and 220 ± 35 ppm which produced mean ± S.D. dosage levels of 0, 5.9 ± 0.6, 10.0 ± 1.2, and 19.3 ± 2.7 mg/kg for male rats and 0, 7.5 ± 0.4, 12.6 ± 1.1, and 25.6 ± 2.4 mg/kg for female rats. Forty-eight rats/sex/VDC level and 80 rats/sex in the control group were used in the 2-year study with an interim kill of an additional 10 rats/sex/level at 90 days. In the inhalation study, rats were exposed to 0, 10, or 40 ppm of VDC vapor 6 hr/day, 5 days/week for 5 weeks, after which the exposure levels were changed to 0, 25, and 75 ppm of VDC. Exposure continued for a total of 18 months and the rats held for observation an additional 6 months. Interim kills occurred at 1, 6 and 12 months. A separate 90-day study using 20 rats/sex/level was conducted at 0, 25, and 75 ppm of VDC vapor. There were 86 rats/sex/level in the 2-year portion of the study. The parameters monitored were: body weight, food and water consumption (drinking water study only), hematology, clinical chemistries, cytogentics of bone marrow cells (inhalation study only), mortality, terminal organ weights, and gross and histopathology. Based on interim kills and gross pathologic observations, the main conclusions are: increased cytoplasmic vacuolation of hepatocytes was seen in the livers of rats given 200 ppm VDC in drinking water or 25 or 75 ppm VDC vapor by inhalation; based on gross tumor count, tumor incidence in VDC-exposed rats was not greater than controls. PMID:612457
Human Factors Experiments for Data Link : Interim Report No. 5
DOT National Transportation Integrated Search
1975-02-01
One and two-man crews of general aviation pilots and two-man crews of FAA/NAFEC test pilots made a series of simulated flights in a GAT-2 simulator to evaluate various complements of I/O equipment for Data Link. In the earlier experiments in the seri...
Communicating Ocean Sciences to Informal Audiences (COSIA): Interim Evaluation Report
ERIC Educational Resources Information Center
St. John, Mark; Phillips, Michelle; Smith, Anita; Castori, Pam
2009-01-01
Communicating Ocean Sciences to Informal Audiences (COSIA) is a National Science Foundation (NSF)-funded project consisting of seven long-term three-way partnerships between the Lawrence Hall of Science (LHS) and an informal science education institution (ISEI) partnered with an institution of higher education (IHE). Together, educators from the…
DOT National Transportation Integrated Search
1983-01-01
The condition of six concrete bridge slabs that had been in service for three years was evaluated. The top 2 in. of the four slabs that had been impregnated to a depth of about 1 in. with a methyl methacrylate and trimethylolpropane trimethacrylate m...
Linking the ACT ASPIRE Assessments to NWEA MAP Assessments
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from Measures of Academic Progress® (MAP®) interim assessment scores. One important tool is the concordance table between MAP and state summative assessments. Concordance tables have been used for decades to relate scores on…
This document provides an update to the Agency’s interim guidance for the efficacy evaluation of antimicrobial pesticides that are labeled for treating hard non-porous surfaces in healthcare settings contaminated with spores of Clostridium difficile.
DOT National Transportation Integrated Search
1981-01-01
This report describes a method for locating historic site information using a computer graphics program. If adopted for use by the Virginia Department of Highways and Transportation, this method should significantly reduce the time now required to de...
Interim Guidelines for Growing Longleaf Seedlings in Containers
James P. Barnett; Mark J. Hainds; George A. Hernandez
2002-01-01
The demand for container longleaf pine (Pinus palustris Mill.) planting stock continues to increase each year. A problem facing both producers and users of container seedlings is the lack of target seedling specifications. Outplanting and evaluating performance of seedlings with a range of physiological and morphological characteristics, over a...
DOT National Transportation Integrated Search
1977-01-01
The report describes the installation and load test of the world's first press-lam timber bridge superstructure. A five-man crew replaced the substandard steel stringer-timber deck superstructure on Rte. 610 over Little Stoney Creek in Shenandoah Cou...
Evaluation of pavement edge inset and low level illumination lights in fog : interim report no. 1.
DOT National Transportation Integrated Search
1973-01-01
The Virginia Highway Research Council was asked to search for ways of making travel safer on fogbound highways. All literature obtainable on fog research was reviewed and after an in-depth review of fog abatement techniques it became apparent that ne...
NASA Technical Reports Server (NTRS)
1981-01-01
The objectives were to define, evaluate, and select concepts for evolving a space station in conjunction with the Space Platform for NASA science, Applications, Technology and DOD; and a permanently manned presence in space early, with a maximum of existing technology.
Commentary: Evaluating the Validity of Formative and Interim Assessment
ERIC Educational Resources Information Center
Shepard, Lorrie A.
2009-01-01
In many school districts, the pressure to raise test scores has created overnight celebrity status for formative assessment. Its powers to raise student achievement have been touted, however, without attending to the research on which these claims were based. Sociocultural learning theory provides theoretical grounding for understanding how…
National Assessment of Vocational Education: Interim Report to Congress.
ERIC Educational Resources Information Center
Silverberg, Marsha; Warner, Elizabeth; Goodwin, David; Fong, Michael
Analyses completed prior to November 2001 provided a context for examining vocational education (VE) and a description of participation at secondary and postsecondary levels, a logical first step in evaluating VE's status and effectiveness. They were a small, but significant part of a comprehensive research agenda being conducted under the…
Putting Data to Work: Interim Recommendations from The Benchmarking Project
ERIC Educational Resources Information Center
Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol
2010-01-01
As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…
Frequency of Examinations and Student Achievement in a Randomized Experiment
ERIC Educational Resources Information Center
De Paola, Maria; Scoppa, Vincenzo
2011-01-01
We carry out a randomized experiment involving undergraduate students enrolled at an Italian University attending two introductory economics classes to evaluate the impact on achievement of examination frequency and interim feedback provision. Students in the treated group were allowed to undertake an intermediate exam and were informed about the…
DOT National Transportation Integrated Search
2000-01-01
The Ohio Department of Transportation (ODOT) currently uses density and moisture measured with a nuclear density gauge as the principal criteria for approving subgrade construction in Ohio. This procedure is time consuming, thereby restricting the nu...
DOT National Transportation Integrated Search
1983-01-01
The installation of thin polymer concrete overlays on five bridges on I-85 near Williamsburg, Virginia, has demonstrated that an overlay of low permeability and high skid resistance can be successfully installed by a contractor with a minimum of disr...
Kolinski, Martin; Hess, Pablo; Leziy, Sonia; Friberg, Bertil; Bellucci, Gionata; Trisciuoglio, Davide; Wagner, Wilfried; Moergel, Maximilian; Pozzi, Alessandro; Wiltfang, Jörg; Behrens, Eleonore; Zechner, Werner; Vasak, Christoph; Weigl, Paul
2018-07-01
The aim of this interim analysis of a 5-year prospective multicenter study is to evaluate clinical and radiological performance of immediately provisionalized 3.0-mm-diameter tapered implants. Patients needing implant rehabilitation of maxillary lateral incisors or mandibular lateral and central incisors were treated with 3.0-mm-diameter implants placed in extraction or healed sites and immediately provisionalized. Clinical and radiographic examinations were performed at implant insertion, 6 months thereafter, and are ongoing. Marginal bone levels and changes, complications, the papilla, plaque, and bleeding indices, and the pink esthetic score (PES) were evaluated at each follow-up visit. Of 112 enrolled patients, 77 patients (91 implants) met the inclusion criteria. Seventy-one patients with 82 implants completed the 1-year follow-up. Three implants failed yielding a CSR of 96.7%. All failures occurred within the first 3 months after implant insertion. Marginal bone level changes from insertion to 6 months was - 0.57 ± 1.30 mm (n = 75) and from insertion to 12 months - 0.25 ± 1.38 mm (n = 72). Fifteen non-serious complications were recorded. Papilla index score and PES improved at the 1-year follow-up. Plaque formation and bleeding-on-probing showed no statistically significant differences between the 6-month and the 1-year visit. This 1-year analysis demonstrated high survival, stable bone levels, and healthy soft tissue with 3.0-mm-diameter implants. Narrow diameter implants are a safe and predictable treatment option in patients with limited bone volume and/or limited interdental space and eligible for immediate loading protocols.
Kikui, Miki; Kokubo, Yoshihiro; Ono, Takahiro; Kida, Momoyo; Kosaka, Takayuki; Yamamoto, Masaaki; Watanabe, Makoto; Maeda, Yoshinobu; Miyamoto, Yoshihiro
2017-05-01
A positive association between metabolic syndrome (MetS) and periodontal status has recently been noted. However, no study has evaluated the relationship by sex and in a general urban population using the uniform definition proposed in the 2009 Joint Interim Statement. The aim of this study was to clarify the relationship between MetS and periodontal status using the uniform definition in a general urban Japanese population. A total of 1,856 Japanese men and women (mean age: 66.4 years) were studied using data from the Suita study. Periodontal status was evaluated by the Community Periodontal Index (CPI). MetS was defined using the 2009 Joint Interim Statement. The associations of the MetS and its components with periodontal disease were investigated using multiple logistic regression analysis adjusting for age, drinking, and smoking. Among the components of the MetS, low HDL cholesterol level was significantly associated with periodontal disease in men and women [odds ratios (OR)=2.39 and 1.53; 95% confidence intervals=1.36-4.19 and 1.06-2.19]. Furthermore, the risk of periodontal disease showed 1.43-, 1.42-, and 1.89-fold increases in those with 2, 3, and ≥4 components, respectively, compared with those having no components (P trend <0.001). For the analysis by sex, the risk of periodontal disease was increased 2.27- and 1.76-fold in those with ≥4 components in men and women, respectively (both P trend =0.001). These findings suggest that MetS and lower HDL cholesterol are associated with periodontal disease. Subjects with two or more MetS components had a significantly higher prevalence of periodontal disease.
Kikui, Miki; Kokubo, Yoshihiro; Kida, Momoyo; Kosaka, Takayuki; Yamamoto, Masaaki; Watanabe, Makoto; Maeda, Yoshinobu; Miyamoto, Yoshihiro
2017-01-01
Aim: A positive association between metabolic syndrome (MetS) and periodontal status has recently been noted. However, no study has evaluated the relationship by sex and in a general urban population using the uniform definition proposed in the 2009 Joint Interim Statement. The aim of this study was to clarify the relationship between MetS and periodontal status using the uniform definition in a general urban Japanese population. Methods: A total of 1,856 Japanese men and women (mean age: 66.4 years) were studied using data from the Suita study. Periodontal status was evaluated by the Community Periodontal Index (CPI). MetS was defined using the 2009 Joint Interim Statement. The associations of the MetS and its components with periodontal disease were investigated using multiple logistic regression analysis adjusting for age, drinking, and smoking. Results: Among the components of the MetS, low HDL cholesterol level was significantly associated with periodontal disease in men and women [odds ratios (OR) = 2.39 and 1.53; 95% confidence intervals = 1.36–4.19 and 1.06–2.19]. Furthermore, the risk of periodontal disease showed 1.43-, 1.42-, and 1.89-fold increases in those with 2, 3, and ≥ 4 components, respectively, compared with those having no components (Ptrend < 0.001). For the analysis by sex, the risk of periodontal disease was increased 2.27- and 1.76-fold in those with ≥ 4 components in men and women, respectively (both Ptrend = 0.001). Conclusion: These findings suggest that MetS and lower HDL cholesterol are associated with periodontal disease. Subjects with two or more MetS components had a significantly higher prevalence of periodontal disease. PMID:27725400
Lopès, P; Levy-Toledano, R; Chiarelli, P; Rimbault, F; Marès, P
2014-03-01
Perineal reeducation of stress urinary incontinence is beneficial in 80% of cases. However, patients have to perform self-retraining exercises of the perineal muscles at home, in order to maintain the benefit of the physiotherapy. The aim of this study is to assess the benefit of GYNEFFIK(®), a perineal electro-stimulator, during this home-care phase. Women with stress urinary incontinence (UI) or with mixed UI (composed predominantly of stress UI) that responded to physiotherapy were included in this study in two parallel groups. The groups followed a self-reeducation program, with or without GYNEFFIK(®) electro-stimulation sessions. The comparison of the two groups was based on the rate of women for whom the benefit of the initial perineal reeducation was maintained (defined as non-worsening ICIQ and Ditrovie scales' score). According to the protocol, an interim analysis was performed on 95 patients (i.e. almost half of the expected sample size) who had had at least one evaluation under treatment, among which 44 patients had finished the study. The therapeutic benefit of the initial perineal reeducation was maintained in 87.8% of the GYNEFFIK(®) patient group, while it was maintained in 52.2% (P=0.0001) in the usual care group (i.e. who did not use electro-stimulation). Likewise, patient had a more favorable subjective impression when using GYNEFFIK(®) (83.7% versus 60.0% in the usual care group) as they felt that they improved during the study. In the GYNEFFIK(®) group, no increase in symptoms was reported, whereas almost one out of five patients in the usual care group felt that their condition had worsened. Copyright © 2014. Published by Elsevier SAS.
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
ERIC Educational Resources Information Center
Nugent, Patricia A.
2011-01-01
The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
17 CFR 210.10-01 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
75 FR 66553 - Truth in Lending
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...
Staff Reactions to Interim Leadership in a Student Affairs Organization
ERIC Educational Resources Information Center
Jones, Robin D.
2011-01-01
Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…
12 CFR 541.18 - Interim Federal savings association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
Into the Sunset: Reflections of an Interim Administrator.
ERIC Educational Resources Information Center
Marlowe, John
2000-01-01
One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)
2015-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on
NASA Technical Reports Server (NTRS)
Kitzis, J. L.; Kitzis, S. N.
1979-01-01
An evaluation of the versions of the SEASAT-A SMMR antenna pattern correction (APC) algorithm is presented. Two efforts are focused upon in the APC evaluation: the intercomparison of the interim, box, cross, and nominal APC modes; and the development of software to facilitate the creation of matched spacecraft and surface truth data sets which are located together in time and space. The problems discovered in earlier versions of the APC, now corrected, are discussed.
NASA Astrophysics Data System (ADS)
Zhang, X.; Liang, S.; Wang, G.; Yao, Y.; Jiang, B.; Cheng, J.
2016-12-01
Solar radiation incident at the Earth's surface (Rs) is an essential component of the total energy exchange between the atmosphere and the surface. Reanalysis data have been widely used, but a comprehensive validation using surface measurements is still highly needed. In this study, we evaluated the Rs estimates from six current representative global reanalyses [NCEP-NCAR, NCEP-DOE; CFSR; ERA-Interim; MERRA; and JRA-55] using surface measurements from different observation networks [GEBA; BSRN; GC-NET; Buoy; and CMA] (674 sites in total) and the Earth's Radiant Energy System (CERES) EBAF product from 2001 to 2009. The global mean biases between the reanalysis Rs and surface measurements at all sites ranged from 11.25 W/m2 to 49.80 W/m2. Comparing with the CERES-EBAF Rs product, all the reanalyses overestimate Rs, except for ERA-Interim, with the biases ranging from -2.98 W/m2 to 21.97 W/m2 over the globe. It was also found that the biases of cloud fraction (CF) in the reanalyses caused the overestimation of Rs. After removing the averaged bias of CERES-EBAF, weighted by the area of the latitudinal band, a global annual mean Rs values of 184.6 W/m2, 180.0 W/m2, and 182.9 W/m2 was obtained over land, ocean, and the globe, respectively.
Objectively classifying Southern Hemisphere extratropical cyclones
NASA Astrophysics Data System (ADS)
Catto, Jennifer
2016-04-01
There has been a long tradition in attempting to separate extratropical cyclones into different classes depending on their cloud signatures, airflows, synoptic precursors, or upper-level flow features. Depending on these features, the cyclones may have different impacts, for example in their precipitation intensity. It is important, therefore, to understand how the distribution of different cyclone classes may change in the future. Many of the previous classifications have been performed manually. In order to be able to evaluate climate models and understand how extratropical cyclones might change in the future, we need to be able to use an automated method to classify cyclones. Extratropical cyclones have been identified in the Southern Hemisphere from the ERA-Interim reanalysis dataset with a commonly used identification and tracking algorithm that employs 850 hPa relative vorticity. A clustering method applied to large-scale fields from ERA-Interim at the time of cyclone genesis (when the cyclone is first detected), has been used to objectively classify identified cyclones. The results are compared to the manual classification of Sinclair and Revell (2000) and the four objectively identified classes shown in this presentation are found to match well. The relative importance of diabatic heating in the clusters is investigated, as well as the differing precipitation characteristics. The success of the objective classification shows its utility in climate model evaluation and climate change studies.
Evaluation of reanalysis datasets against observational soil temperature data over China
NASA Astrophysics Data System (ADS)
Yang, Kai; Zhang, Jingyong
2018-01-01
Soil temperature is a key land surface variable, and is a potential predictor for seasonal climate anomalies and extremes. Using observational soil temperature data in China for 1981-2005, we evaluate four reanalysis datasets, the land surface reanalysis of the European Centre for Medium-Range Weather Forecasts (ERA-Interim/Land), the second modern-era retrospective analysis for research and applications (MERRA-2), the National Center for Environmental Prediction Climate Forecast System Reanalysis (NCEP-CFSR), and version 2 of the Global Land Data Assimilation System (GLDAS-2.0), with a focus on 40 cm soil layer. The results show that reanalysis data can mainly reproduce the spatial distributions of soil temperature in summer and winter, especially over the east of China, but generally underestimate their magnitudes. Owing to the influence of precipitation on soil temperature, the four datasets perform better in winter than in summer. The ERA-Interim/Land and GLDAS-2.0 produce spatial characteristics of the climatological mean that are similar to observations. The interannual variability of soil temperature is well reproduced by the ERA-Interim/Land dataset in summer and by the CFSR dataset in winter. The linear trend of soil temperature in summer is well rebuilt by reanalysis datasets. We demonstrate that soil heat fluxes in April-June and in winter are highly correlated with the soil temperature in summer and winter, respectively. Different estimations of surface energy balance components can contribute to different behaviors in reanalysis products in terms of estimating soil temperature. In addition, reanalysis datasets can mainly rebuild the northwest-southeast gradient of soil temperature memory over China.
NASA Technical Reports Server (NTRS)
Johnson, Jill W. (Compiler)
2015-01-01
This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.
Results from the VALUE perfect predictor experiment: process-based evaluation
NASA Astrophysics Data System (ADS)
Maraun, Douglas; Soares, Pedro; Hertig, Elke; Brands, Swen; Huth, Radan; Cardoso, Rita; Kotlarski, Sven; Casado, Maria; Pongracz, Rita; Bartholy, Judit
2016-04-01
Until recently, the evaluation of downscaled climate model simulations has typically been limited to surface climatologies, including long term means, spatial variability and extremes. But these aspects are often, at least partly, tuned in regional climate models to match observed climate. The tuning issue is of course particularly relevant for bias corrected regional climate models. In general, a good performance of a model for these aspects in present climate does therefore not imply a good performance in simulating climate change. It is now widely accepted that, to increase our condidence in climate change simulations, it is necessary to evaluate how climate models simulate relevant underlying processes. In other words, it is important to assess whether downscaling does the right for the right reason. Therefore, VALUE has carried out a broad process-based evaluation study based on its perfect predictor experiment simulations: the downscaling methods are driven by ERA-Interim data over the period 1979-2008, reference observations are given by a network of 85 meteorological stations covering all European climates. More than 30 methods participated in the evaluation. In order to compare statistical and dynamical methods, only variables provided by both types of approaches could be considered. This limited the analysis to conditioning local surface variables on variables from driving processes that are simulated by ERA-Interim. We considered the following types of processes: at the continental scale, we evaluated the performance of downscaling methods for positive and negative North Atlantic Oscillation, Atlantic ridge and blocking situations. At synoptic scales, we considered Lamb weather types for selected European regions such as Scandinavia, the United Kingdom, the Iberian Pensinsula or the Alps. At regional scales we considered phenomena such as the Mistral, the Bora or the Iberian coastal jet. Such process-based evaluation helps to attribute biases in surface variables to underlying processes and ultimately to improve climate models.
The global perspective on neurology training: the World Federation of Neurology survey.
Steck, Andreas; Struhal, Walter; Sergay, Stephen M; Grisold, Wolfgang
2013-11-15
This World Federation of Neurology (WFN) study aimed to characterize the status quo of post-graduate neurology training throughout the world and enable a better orientation on global training in neurology. Basic data on training curricula and working conditions of neurology residents and neurologists in 39 countries worldwide were evaluated. Our data show considerable differences in manpower and training, but a continuous improvement within the last 10 years of observation. Worldwide a spread of interim evaluations and final examinations of different types are used. Online resources will undoubtedly profoundly change skill and knowledge acquisition and training practices in Neurology in the coming years. © 2013 Elsevier B.V. All rights reserved.
Harmon, Rachael E; Boulmay, Brian C
2011-01-01
Oncology services at Charity Hospital were discontinued following Hurricane Katrina in August 2005. Medical oncology and chemotherapy services resumed at the Louisiana State University Interim Public Hospital in 2007. Demographic, clinical, and displacement data of the re-established patient cohort were reviewed. Patients evaluated in the Louisiana State University Health Sciences Center (LSUHSC) Oncology Clinics from September 1, 2007, to August 31, 2009, were identified and data collected included time from diagnosis of malignancy to initial oncology evaluation, insurance status, percentage displaced for six months or more due to Hurricane Katrina, ethnicity, referrals for radiation oncology, and the number of outpatient clinical encounters (OCE). 464 patients were evaluated in the study time period. Sixty-five percent of the patients had new cancer diagnoses and 35% re-established cancer care in the Charity System and a substantial proportion were either unfunded or had Medicaid coverage. Thirty-four percent were confirmed to be displaced from New Orleans for greater than six months and the majority of patients were black. The majority of new cancer diagnoses were breast, lung, and colon cancer. Human immunodeficiency virus (HIV) positive patients made up 7.5% of the patient cohort. There was a 70% decline in patient volumes following Hurricane Katrina. Oncology services for a minority-based, underinsured patient population were severely impacted by Hurricane Katrina. Following the storm, persistent systemwide resource limitations led to suboptimal timeliness of medical oncology evaluations. Health care systems serving underinsured patients require a disaster plan to minimize interruption of oncology care. Our experience illustrates the need for resources to ensure rapid re-establishment of care for economically disadvantaged patients following natural disasters.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?
Code of Federal Regulations, 2010 CFR
2010-07-01
... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...
18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...
42 CFR 417.572 - Budget and enrollment forecast and interim reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...