Shuttle payload vibroacoustic test plan evaluation
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
The influence of various test plans on mission reliability. [for Shuttle Spacelab payloads
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.
The Evaluation of Carpet Steam/Heat Cleaners as Biological Sampling Device
2011-12-08
Vacuum Cleaner Evaluation as sampling Device Test Plan DHS Page 16 of 16 Fumigants , and Issues Related to Laboratory-scale Studies. Appl. Environ...ECBC Wet/dry Vacuum Cleaner Evaluation as sampling Device Test Plan DHS Page 1 of 16 Test Plan for The Evaluation of Carpet Steam...b. ABSTRACT unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 ECBC Wet/dry Vacuum Cleaner
Specific test and evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Advanced On-the-Job Training System: Master Test Plan
1990-05-01
synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four crit’cal issues of system compliance...acceptance, performance and suitability. Within the MTP, these critical issues are assessed at subcomponent, component, and subsystem levels. 14. SUBJECT...Master Test Plan is synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four critical issues
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.
1977-01-01
A preliminary assessment of vibroacoustic test plan optimization for free flyer STS payloads is presented and the effects on alternate test plans for Spacelab sortie payloads number of missions are also examined. The component vibration failure probability and the number of components in the housekeeping subassemblies are provided. Decision models are used to evaluate the cost effectiveness of seven alternate test plans using protoflight hardware.
Parametric evaluation of the cost effectiveness of Shuttle payload vibroacoustic test plans
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Keegan, W. B.; Young, J. P.
1978-01-01
Consideration is given to alternate vibroacoustic test plans for sortie and free flyer Shuttle payloads. Statistical decision models for nine test plans provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology is a major step toward the development of a useful tool for the quantitative tailoring of vibroacoustic test programs to sortie and free flyer payloads. A broader application of the methodology is now possible by the use of the OCTAVE computer code.
32 CFR 700.405 - Delegated authority and responsibility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... motivation of Navy personnel and the prestige of a Navy career; (4) To plan and provide health care for..., test, and evaluation to plan and provide for the conduct of test and evaluation which are adequate and... strategic plans and policies and participate in the formulation of Joint and combined strategic plans and...
Using Optimization to Improve Test Planning
2017-09-01
friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool for the test and... evaluation schedulers. 14. SUBJECT TERMS schedule optimization, test planning 15. NUMBER OF PAGES 223 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...make the input more user-friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool
Shuttle payload minimum cost vibroacoustic tests
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
This paper is directed toward the development of the methodology needed to evaluate cost effective vibroacoustic test plans for Shuttle Spacelab payloads. Statistical decision theory is used to quantitatively evaluate seven alternate test plans by deriving optimum test levels and the expected cost for each multiple mission payload considered. The results indicate that minimum costs can vary by as much as $6 million for the various test plans. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level. Test plans using system testing or combinations of component and assembly level testing are attractive alternatives. Component testing alone is shown not to be cost effective.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan..., to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
2010-03-11
IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
DOT National Transportation Integrated Search
2004-01-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
...; surveys, research and evaluation methodologies; demonstration testing and model development; synthesis and..., policy and program analysis; surveys, research and evaluation methodologies; demonstration testing and... Organization, Functions, and Delegations of Authority; Office of Planning, Research and Evaluation AGENCY...
Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project
DOT National Transportation Integrated Search
1997-01-01
This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...
Project W-314 specific test and evaluation plan for AZ tank farm upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-08-12
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Minnesota urban partnership agreement national evaluation : exogenous factors test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the exogenous factors test plan for the national evaluation of the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reduc...
Minnesota urban partnership agreement national evaluation : transit system data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...
DOT National Transportation Integrated Search
2009-11-17
This report presents the test plan for developing, conducting, and analyzing surveys, interviews, and focus groups for evaluating the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Prog...
Materiel Acquisition Management Guide
1980-02-11
Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM project...
Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle
NASA Technical Reports Server (NTRS)
Cockrell, Charles
2008-01-01
NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.
Electronic intermodal supply chain manifest ITS field operational test evaluation plan
DOT National Transportation Integrated Search
2000-09-25
This document is an evaluation plan for a field operational test (FOT) that is based at O'Hare International Airport in Chicago and which will focus on the air cargo component of intermodal freight movements. The objectives of the FOT are to develop,...
Gallio, Elena; Giglioli, Francesca Romana; Girardi, Andrea; Guarneri, Alessia; Ricardi, Umberto; Ropolo, Roberto; Ragona, Riccardo; Fiandra, Christian
2018-02-01
Automated treatment planning is a new frontier in radiotherapy. The Auto-Planning module of the Pinnacle 3 treatment planning system (TPS) was evaluated for liver stereotactic body radiation therapy treatments. Ten cases were included in the study. Six plans were generated for each case by four medical physics experts. The first two planned with Pinnacle TPS, both with manual module (MP) and Auto-Planning one (AP). The other two physicists generated two plans with Monaco TPS (VM). Treatment plan comparisons were then carried on the various dosimetric parameters of target and organs at risk, monitor units, number of segments, plan complexity metrics and human resource planning time. The user dependency of Auto-Planning was also tested and the plans were evaluated by a trained physician. Statistically significant differences (Anova test) were observed for spinal cord doses, plan average beam irregularity, number of segments, monitor units and human planning time. The Fisher-Hayter test applied to these parameters showed significant statistical differences between AP e MP for spinal cord doses and human planning time; between MP and VM for monitor units, number of segments and plan irregularity; for all those between AP and VM. The two plans created by different planners with AP were similar to each other. The plans created with Auto-Planning were comparable to the manually generated plans. The time saved in planning enables the planner to commit more resources to more complex cases. The independence of the planner enables to standardize plan quality. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan
NASA Technical Reports Server (NTRS)
1973-01-01
The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.
Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.
2015-09-16
The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.
DOT National Transportation Integrated Search
2003-09-16
The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...
Strategy for Alternative Occupant Volume Testing
DOT National Transportation Integrated Search
2009-10-20
This paper describes plans for a series of quasi-static : compression tests of rail passenger equipment. These tests are : designed to evaluate the strength of the occupant volume under : static loading conditions. The research plan includes a detail...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rizzo, Davinia; Blackburn, Mark
Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper coversmore » the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).« less
40 CFR 63.1210 - What are the notification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... change in information already provided under § 63.9. 63.1206(b)(5)(i) Notification of changes in design...), 63.9(e) 63.9(g)(1) and (3) Notification of performance test and continuous monitoring system evaluation, including the performance test plan and CMS performance evaluation plan.1 63.1210(b) Notification...
40 CFR 63.1210 - What are the notification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... change in information already provided under § 63.9. 63.1206(b)(5)(i) Notification of changes in design...), 63.9(e) 63.9(g)(1) and (3) Notification of performance test and continuous monitoring system evaluation, including the performance test plan and CMS performance evaluation plan.1 63.1210(b) Notification...
Benefits of Using Planned Comparisons Rather Than Post Hoc Tests: A Brief Review with Examples.
ERIC Educational Resources Information Center
DuRapau, Theresa M.
The rationale behind analysis of variance (including analysis of covariance and multiple analyses of variance and covariance) methods is reviewed, and unplanned and planned methods of evaluating differences between means are briefly described. Two advantages of using planned or a priori tests over unplanned or post hoc tests are presented. In…
This test/QA plan for evaluation the generic test protocol for high speed wind tunnel, representing aerial application, pesticide spray drift reduction technologies (DRT) for row and field crops is in conformance with EPA Requirements for Quality Assurance Project Plans (EPA QA/R...
This test/QA plan for evaluation the generic test protocol for high speed wind tunnel, representing aerial application, pesticide spray drift reduction technologies (DRT) for row and field crops is in conformance with EPA Requirements for Quality Assurance Project Plans (EPA QA/R...
An Analysis and Plan of Test Development for the Law Enforcement Basic Training Course.
ERIC Educational Resources Information Center
Vineberg, Robert; Taylor, John E.
A test development plan is described to evaluate police enrolled in the law enforcement basic training course developed by California's Commission on Peace Officer Standards and Training (POST). Some general test methodologies are discussed: performance tests, knowledge tests, and situational tests, including role playing simulations and…
General test plan redundant sensor strapdown IMU evaluation program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.
1993-04-01
separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for
Development of Continuing Nursing Education Offerings for the World Wide Web.
ERIC Educational Resources Information Center
Billings, Diane M.; Rowles, Connie J.
2001-01-01
Describes steps for web-based continuing education courses in terms of planning (strategic plan, website development, resource team, marketing plan), implementing (course design, web-based tools, copyright and intellectual property), and evaluating (pilot test, formative/summative evaluation, continuous quality improvement). (Contains 16…
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
Test/QA Plan for Verification of Leak Detection and Repair Technologies
The purpose of the leak detection and repair (LDAR) test and quality assurance plan is to specify procedures for a verification test applicable to commercial LDAR technologies. The purpose of the verification test is to evaluate the performance of participating technologies in b...
NASA Technical Reports Server (NTRS)
Yao, S. S. (Principal Investigator)
1981-01-01
The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.
DOT National Transportation Integrated Search
1995-12-01
Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...
The K-ABC, Coding, and Planning: An Investigation of Cognitive Processes.
ERIC Educational Resources Information Center
Das, J. P.; And Others
1990-01-01
Evaluated elementary school students (N=198) using six mental processing subtests of the Kaufman Assessment Battery for Children (K-ABC) and three tests of planning. Results indicated orthogonal simultaneous and sequential factors emerged; the verbal simultaneous test was a good addition; and a "planning" factor identified by three…
The purpose of the cavity ringdown spectroscopy (CRDS) technology test and quality assurance plan is to specify procedures for a verification test applicable to commercial cavity ringdown spectroscopy technologies. The purpose of the verification test is to evaluate the performa...
Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress
2013-10-22
states: The CVN 78 is experiencing cost growth due to “first of class” material availability (i.e., valves, actuators ), construction labor...assessment during IOT &E [initial operational test and evaluation]. • The current TEMP [test and evaluation master plan] does not adequately address...developmental testing significantly raises the likelihood of the discovery of platform-level problems during IOT &E. • The Navy plans to deliver CVN-78 in
The Role of Evaluation and Plans for Evaluating the Current Testing Program.
ERIC Educational Resources Information Center
Winters, Lynn
The Palos Verdes Peninsula Unified School District Office of Program Evaluation and Research is responsible for providing information for program development and improvement; providing test information to special programs coordinators; and acting as a clearinghouse for all information concerning tests, evaluation methodology, and educational…
A test manager's perspective of a test concept for a heavy lift vehicle
NASA Technical Reports Server (NTRS)
Pargeon, John I., Jr.
1990-01-01
The developmment of a test concept is a significant part of the advanced planning activities accomplished for the Initial Operational Test and Evaluation (IOT&E) of new systems. A test concept is generally viewed as a description, including rationale, of the test structure, evaluation methodology and management approach required to plan and conduct the IOT&E of a program such as a new heavy lift launch vehicle system. The test concept as presented in this paper is made up of an operations area, a test area, an evaluation area, and a management area. The description presented here is written from the perspective of one test manager, and represents his views of a possible framework of a test concept using examples for a potential IOT&E of a heavy lift launch vehicle.
ERIC Educational Resources Information Center
Gresham, Frank M.; Witt, Joseph C.
1997-01-01
Maintains that intelligence tests contribute little to the planning, implementation, and evaluation of instructional interventions for children. Suggests that intelligence tests are not useful in making differential diagnostic and classification determinations for children with mild learning problems and that such testing is not a cost-beneficial…
DOT National Transportation Integrated Search
2004-01-28
This document presents the detailed plan to conduct the Key Informants Interviews Test, one of several test activities to be conducted as part of the national evaluation of the regional, multi-modal 511 Traveler Information System Model Deployment. T...
Optimization of a pavement instrumentation plan for a full-scale test road : evaluation.
DOT National Transportation Integrated Search
2014-04-01
A 2.5-mile, concrete test road is planned for construction by the Florida Department of Transportation (FDOT) in : 2016. To support the goals of the test road, a comprehensive instrumentation system is required to provide : reliable data over a long ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roper, J; Bradshaw, B; Godette, K
Purpose: To create a knowledge-based algorithm for prostate LDR brachytherapy treatment planning that standardizes plan quality using seed arrangements tailored to individual physician preferences while being fast enough for real-time planning. Methods: A dataset of 130 prior cases was compiled for a physician with an active prostate seed implant practice. Ten cases were randomly selected to test the algorithm. Contours from the 120 library cases were registered to a common reference frame. Contour variations were characterized on a point by point basis using principle component analysis (PCA). A test case was converted to PCA vectors using the same process andmore » then compared with each library case using a Mahalanobis distance to evaluate similarity. Rank order PCA scores were used to select the best-matched library case. The seed arrangement was extracted from the best-matched case and used as a starting point for planning the test case. Computational time was recorded. Any subsequent modifications were recorded that required input from a treatment planner to achieve an acceptable plan. Results: The computational time required to register contours from a test case and evaluate PCA similarity across the library was approximately 10s. Five of the ten test cases did not require any seed additions, deletions, or moves to obtain an acceptable plan. The remaining five test cases required on average 4.2 seed modifications. The time to complete manual plan modifications was less than 30s in all cases. Conclusion: A knowledge-based treatment planning algorithm was developed for prostate LDR brachytherapy based on principle component analysis. Initial results suggest that this approach can be used to quickly create treatment plans that require few if any modifications by the treatment planner. In general, test case plans have seed arrangements which are very similar to prior cases, and thus are inherently tailored to physician preferences.« less
DOT National Transportation Integrated Search
1995-10-01
REAL-TIME TRAFFIC INFORMATION, ROUTE GUIDANCE, ROUTE PLANNING, INTELLIGENT VEHICLE INITIATIVE OR IVI ">">KEYWORDS: OPERATIONAL TESTS, TRAVTEK, ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS, ADVANCED TRAFFIC MANAGEMENT SYSTEMS OR ATMS, INTELLI...
Multi-Dimensional Planning/Evaluation Schema for Community Education.
ERIC Educational Resources Information Center
Merkel-Keller, Claudia; Herr, Audrey
A model for planning and evaluating community education programs--Stufflebeam's context, input, process, product (CIPP) evaluation model--was described and field-tested with the community education programs in Lakewood, New Jersey. Community education was defined as a concern for everything that affects the well-being of all citizens within a…
Optimization of a pavement instrumentation plan for a full-scale test road : evaluation, [summary].
DOT National Transportation Integrated Search
2014-04-01
The Florida Department of Transportation (FDOT) : has begun planning for a concrete test road : that will run parallel to US-301 for 2.5 miles in : Bradford County. Test road construction begins in : 2016. The roads 52 segments will enable real-wo...
Evaluation Plan for the Computerized Adaptive Vocational Aptitude Battery.
ERIC Educational Resources Information Center
Green, Bert F.; And Others
The United States Armed Services are planning to introduce computerized adaptive testing (CAT) into the Armed Services Vocational Aptitude Battery (ASVAB), which is a major part of the present personnel assessment procedures. Adaptive testing will improve efficiency greatly by assessing each candidate's answers as the test progresses and posing…
Minnesota urban partnership agreement national evaluation : content analysis test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the content analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing ...
Test Plan for SSR Antenna Rotation Rate Stabilization
DOT National Transportation Integrated Search
1981-10-01
A comprehensive test plan is presented to evaluate the impact of wind and ice loading on the rotation rate stability of a Secondary Surveillance Radar (SSR) antenna used for air traffic control surveillance. Antenna rotation rate variations may intro...
Minnesota urban partnership agreement national evaluation : telecommuting test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the telecommuting test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing str...
Vibroacoustic test plan evaluation: Parameter variation study
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloef, H. R.
1976-01-01
Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.
Atay, Selma; Karabacak, Ukke
2012-06-01
It is expected that nursing education improves abilities of students in solving problems, decision making and critical thinking in different circumstances. This study was performed to analyse the effects of care plans prepared using concept maps on the critical thinking dispositions of students. An experimental group and a control group were made up of a total of 80 freshman and sophomore students from the nursing department of a health school. The study used a pre-test post-test control group design. The critical thinking dispositions of the groups were measured using the California Critical Thinking Disposition Inventory. In addition, the care plans prepared by the experimental group students were evaluated using the criteria for evaluating care plans with concept maps. T-test was used in analysing the data. The results showed that there were no statistically significant differences in the total and sub-scale pre-test scores between the experimental group and control group students. There were also significant differences in the total and sub-scale post-test scores between the experimental group and control group students. There were significant differences between concept map care plan evaluation criteria mean scores of the experimental students. In the light of these findings, it could be argued that the concept mapping strategy improves critical thinking skills of students. © 2012 Blackwell Publishing Asia Pty Ltd.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Acadia National Park ITS field operational test : evaluation plan
DOT National Transportation Integrated Search
2000-08-01
This document presents the plan for evaluating technologies known as Intelligent Transportation Systems (ITS) that will be implemented in Acadia National Park and Mount Desert Island, Maine. Acadia National Park was selected as a site for an ITS Fiel...
Minnesota urban partnership agreement national evaluation : cost benefit analysis test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the cost benefit analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by emplo...
Minnesota urban partnership agreement national evaluation : safety data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...
San Francisco urban partnership agreement, national evaluation : content analysis test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, : and reactions of the public, policy makers, and other groups to the UPA projects for the San Francisco Urban : Partnership Agreement...
Minnesota urban partnership agreement national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...
San Francisco urban partnership agreement, national evaluation : exogenous factors test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing exogenous factors data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects...
Minnesota urban partnership agreement national evaluation : tolling test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the test plan for collecting and analyzing toll data for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing co...
San Francisco urban partnership agreement, national evaluation : environmental data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing environmental data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects foc...
Evaluation of Extended-Wear Hearing Aid Technology for Operational Military Use
2016-07-01
listeners without degrading auditory situational awareness. To this point, significant progress has been made in this evaluation process. The devices...provide long-term hearing protection for listeners with normal hearing with minimal impact on auditory situational awareness and minimal annoyance due to...Test Plan: A comprehensive test plan is complete for the measurements at AFRL, which will incorporate goals 1-2 and 4-5 above using a normal
49 CFR 110.40 - Activities eligible for funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... emergency response drills and exercises associated with emergency preparedness plans. (6) Provision of... associated with training, a course of study, and tests and evaluation of emergency preparedness plans. (4..., and implementation of emergency plans required under the Emergency Planning and Community Right-to...
Director, Operational Test and Evaluation FY 2014 Annual Report
2015-01-01
Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014
2012-11-01
Research , Development, Test , and Evaluation (RDT&E) Appropriations The RDT&E appropriation consists of the mission program budgets for all... research , development, test and evaluation work performed by contractors and government installations and includes an installations and activities budget...than $4,000,000. 9 f. Research , Development, Test , and Evaluation Appropriations The Research , Development, Test , and Evaluation (RDT&E
ERIC Educational Resources Information Center
California Community Colleges, Sacramento. Office of the Chancellor.
One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents a plan of purposes and activities to experimentally test a model of delineation of responsibilities among accrediting commissions, state agencies, and…
San Francisco urban partnership agreement, national evaluation : cost benefit analysis test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing cost and benefit data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects ...
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing traveler information data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA proje...
San Francisco urban partnership agreement, national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing traffic system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects fo...
San Francisco urban partnership agreement, national evaluation : transit system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing the transit system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA project...
Aboveground Injection Sytem Construction and Mecahnical Integrity Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Jun
An In-Situ Bioremediation (ISB) Pilot Test Treatability Study is planned at Sandia National Laboratories, New Mexico (SNL/NM) Technical Area-V (TA-V) Groundwater Area of Concern. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater using an injection well. The constituents of concern (COCs) are nitrate and trichloroethene (TCE). The Pilot Test Treatability Study will evaluate the effectiveness of bioremediation and COC treatment over a prescribed period of time. Results of the pilot test will provide data that will be used to evaluate the cost and effectiveness of a fullscale system.
Planning and executing complex large-scale exercises.
McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M
2014-01-01
Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.
Strategic plan for the FleetForward evaluation : technical memorandum
DOT National Transportation Integrated Search
1999-04-01
This document is the final report for the evaluation of the I-95 Corridor Coalitions FleetForward operational test. The objective of this test was to evaluate the usefulness of traffic flow data to motor carrier operations. Cambridge Systematics, in ...
SPIDERplan: A tool to support decision-making in radiation therapy treatment plan assessment.
Ventura, Tiago; Lopes, Maria do Carmo; Ferreira, Brigida Costa; Khouri, Leila
2016-01-01
In this work, a graphical method for radiotherapy treatment plan assessment and comparison, named SPIDERplan, is proposed. It aims to support plan approval allowing independent and consistent comparisons of different treatment techniques, algorithms or treatment planning systems. Optimized plans from modern radiotherapy are not easy to evaluate and compare because of their inherent multicriterial nature. The clinical decision on the best treatment plan is mostly based on subjective options. SPIDERplan combines a graphical analysis with a scoring index. Customized radar plots based on the categorization of structures into groups and on the determination of individual structures scores are generated. To each group and structure, an angular amplitude is assigned expressing the clinical importance defined by the radiation oncologist. Completing the graphical evaluation, a global plan score, based on the structures score and their clinical weights, is determined. After a necessary clinical validation of the group weights, SPIDERplan efficacy, to compare and rank different plans, was tested through a planning exercise where plans had been generated for a nasal cavity case using different treatment planning systems. SPIDERplan method was applied to the dose metrics achieved by the nasal cavity test plans. The generated diagrams and scores successfully ranked the plans according to the prescribed dose objectives and constraints and the radiation oncologist priorities, after a necessary clinical validation process. SPIDERplan enables a fast and consistent evaluation of plan quality considering all targets and organs at risk.
USDA-ARS?s Scientific Manuscript database
The objective of this work is to evaluate a proposed Test Plan for the validation testing of pesticide spray drift reduction technologies for row and field crops, focusing on the testing of ground and aerial application systems under full-scale field evaluations. The measure of performance for a gi...
NASA Technical Reports Server (NTRS)
Maris, John
2015-01-01
NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).
30 CFR 282.28 - Environmental protection measures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 282.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... prepared in association with the review and evaluation of the approved Delineation, Testing, or Mining Plan... of a proposed Delineation, Testing, or Mining Plan, the Director may require the lessee to collect...
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
Problems and Procedures in Planning a Situation Based Video Test on Teaching.
ERIC Educational Resources Information Center
Masonis, Edward J.
This paper briefly outlines some problems one must solve when developing a video-based test to evaluate what a teacher knows about learning and instruction. Consideration is given to the effect the use of videotapes of actual classroom behavior have on test planning. Two methods of incorporating such situational material into the test…
DOT National Transportation Integrated Search
2004-12-06
This report describes the findings of the US DOT-sponsored evaluation of the Orlando (Florida) ORANGES multi-modal Field Operational Test (FOT); the report includes: a background description of the ORANGES FOT; the Evaluation Strategy and Plan, which...
DOT National Transportation Integrated Search
2003-03-17
The purpose of this effort is to independently evaluate the Battelle Operational Test Team to test methods for leveraging technology and operations to improve HAZMAT transport security, safety, and operational efficiency. As such, the preceding techn...
2008-11-01
103 2.3.6 Use of Model 4 for MANPRINT Evaluation of the M1A2 in the IOTE ..........103 iv 3. Conclusions...System (ASAS) Block II Initial Operational Test and Evaluation ( IOTE ) 203 Appendix I. Noise and Temperature Measurements in and Around the HETS...Test and Evaluation (LUTE), Initial Operational Test and Evaluation ( IOTE ) or a Follow-on Test and Evaluation (FOTE)—was being planned, our Field
Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide
NASA Technical Reports Server (NTRS)
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Arbelaez, Maria Clara; Alpins, Noel; Verma, Shwetabh; Stamatelatos, George; Arbelaez, Juan Guillermo; Arba-Mosquera, Samuel
2017-12-01
To evaluate clinical outcomes of laser in situ keratomileusis (LASIK) with an aberration-neutral profile centered on the estimated visual axis (considering 70% of the pupil offset toward the corneal vertex) comparing vector planning with manifest refraction planning for the treatment of myopic astigmatism. Muscat Eye Laser Center, Muscat, Sultanate of Oman, Muscat, Oman. Retrospective case series. The outcomes were evaluated at a 6-month follow-up in eyes showing ocular residual astigmatism (ORA) over 0.75 diopters (D) preoperatively. Eighty-five treatments were based on manifest astigmatism (preoperative sphere -2.11 D ± 1.3 [SD], cylinder -0.90 ± 1.0 D), and 79 treatments were based on vector planning (preoperative sphere -2.46 ± 1.5 D, cylinder -0.78 ± 0.79 D). At a 6-month follow-up, 128 patients (164 eyes) were evaluated and no significant differences were observed between the 2 groups in terms of difference between corrected distance visual acuity and uncorrected distance visual acuity (UDVA) (P = .1, t test and Fisher exact test Snellen lines 1 or better, P = .4) and postoperative UDVA (P = .05, t test and Fisher exact test for UDVA 20/16 or better, P = .3). Significant differences were observed between the 2 groups in terms of achieved spherical equivalent (P = .04), corneal toricity, and ORA (P < .001, t test and Fisher exact test for ORA ≤0.75 D, P < .001). Performing LASIK for myopic astigmatism with the vector planning approach resulted in comparable visual outcomes to manifest refraction planning. Copyright © 2017 ASCRS and ESCRS. Published by Elsevier Inc. All rights reserved.
DOT National Transportation Integrated Search
2017-04-28
The document describes the overall process for evaluating Dedicated Short Range Communication (DSRC) Roadside Units (RSU) against USDOT RSU Specification 4.1 in preparation for field evaluation. The Test Cases contained in this document only evaluate...
Neri, Antonio; Stewart, Sherri L; Angell, William
2013-08-08
Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.
This document is the Environmental Technology Verification (ETV) Technology Specific Test Plan (TSTP) for evaluation of drinking water treatment equipment utilizing adsorptive media for synthetic organic chemical (SOC) removal. This TSTP is to be used within the structure provid...
ERIC Educational Resources Information Center
California Univ., Los Angeles. Center for the Study of Evaluation.
This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…
40 CFR 63.1285 - Reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the owner or operator is requested by the Administrator to conduct a performance evaluation for a... requested by the Administrator, a site-specific test plan is not required by this subpart. If requested by the Administrator, the owner or operator must also submit the site-specific test plan required by § 63...
40 CFR 63.775 - Reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the owner or operator is required by the Administrator to conduct a performance evaluation for a... requested by the Administrator, a site-specific test plan is not required by this subpart. If requested by the Administrator, the owner or operator must also submit the site-specific test plan required by § 63...
Engineering evaluation of 24 channel multispectral scanner. [from flight tests
NASA Technical Reports Server (NTRS)
Lambeck, P. F.
1973-01-01
The results of flight tests to evaluate the performance of the 24 channel multispectral scanner are reported. The flight plan and test site are described along with the time response and channel registration. The gain and offset drift, and moire patterns are discussed. Aerial photographs of the test site are included.
NASA Astrophysics Data System (ADS)
McIntosh, Chris; Welch, Mattea; McNiven, Andrea; Jaffray, David A.; Purdie, Thomas G.
2017-08-01
Recent works in automated radiotherapy treatment planning have used machine learning based on historical treatment plans to infer the spatial dose distribution for a novel patient directly from the planning image. We present a probabilistic, atlas-based approach which predicts the dose for novel patients using a set of automatically selected most similar patients (atlases). The output is a spatial dose objective, which specifies the desired dose-per-voxel, and therefore replaces the need to specify and tune dose-volume objectives. Voxel-based dose mimicking optimization then converts the predicted dose distribution to a complete treatment plan with dose calculation using a collapsed cone convolution dose engine. In this study, we investigated automated planning for right-sided oropharaynx head and neck patients treated with IMRT and VMAT. We compare four versions of our dose prediction pipeline using a database of 54 training and 12 independent testing patients by evaluating 14 clinical dose evaluation criteria. Our preliminary results are promising and demonstrate that automated methods can generate comparable dose distributions to clinical. Overall, automated plans achieved an average of 0.6% higher dose for target coverage evaluation criteria, and 2.4% lower dose at the organs at risk criteria levels evaluated compared with clinical. There was no statistically significant difference detected in high-dose conformity between automated and clinical plans as measured by the conformation number. Automated plans achieved nine more unique criteria than clinical across the 12 patients tested and automated plans scored a significantly higher dose at the evaluation limit for two high-risk target coverage criteria and a significantly lower dose in one critical organ maximum dose. The novel dose prediction method with dose mimicking can generate complete treatment plans in 12-13 min without user interaction. It is a promising approach for fully automated treatment planning and can be readily applied to different treatment sites and modalities.
McIntosh, Chris; Welch, Mattea; McNiven, Andrea; Jaffray, David A; Purdie, Thomas G
2017-07-06
Recent works in automated radiotherapy treatment planning have used machine learning based on historical treatment plans to infer the spatial dose distribution for a novel patient directly from the planning image. We present a probabilistic, atlas-based approach which predicts the dose for novel patients using a set of automatically selected most similar patients (atlases). The output is a spatial dose objective, which specifies the desired dose-per-voxel, and therefore replaces the need to specify and tune dose-volume objectives. Voxel-based dose mimicking optimization then converts the predicted dose distribution to a complete treatment plan with dose calculation using a collapsed cone convolution dose engine. In this study, we investigated automated planning for right-sided oropharaynx head and neck patients treated with IMRT and VMAT. We compare four versions of our dose prediction pipeline using a database of 54 training and 12 independent testing patients by evaluating 14 clinical dose evaluation criteria. Our preliminary results are promising and demonstrate that automated methods can generate comparable dose distributions to clinical. Overall, automated plans achieved an average of 0.6% higher dose for target coverage evaluation criteria, and 2.4% lower dose at the organs at risk criteria levels evaluated compared with clinical. There was no statistically significant difference detected in high-dose conformity between automated and clinical plans as measured by the conformation number. Automated plans achieved nine more unique criteria than clinical across the 12 patients tested and automated plans scored a significantly higher dose at the evaluation limit for two high-risk target coverage criteria and a significantly lower dose in one critical organ maximum dose. The novel dose prediction method with dose mimicking can generate complete treatment plans in 12-13 min without user interaction. It is a promising approach for fully automated treatment planning and can be readily applied to different treatment sites and modalities.
Sirls, Larry T; Richter, Holly E; Litman, Heather J; Kenton, Kimberly; Lemack, Gary E; Lukacz, Emily S; Kraus, Stephen R; Goldman, Howard B; Weidner, Alison; Rickey, Leslie; Norton, Peggy; Zyczynski, Halina M; Kusek, John W
2013-01-01
We evaluated the influence of preoperative urodynamic studies on diagnoses, global treatment plans and outcomes in women treated with surgery for uncomplicated stress predominant urinary incontinence. We performed a secondary analysis from a multicenter, randomized trial of the value of preoperative urodynamic studies. Physicians provided diagnoses before and after urodynamic studies and global treatment plans, defined as proceeding with surgery, surgery type, surgical modification and nonoperative therapy. Treatment plan changes and surgical outcomes between office evaluation and office evaluation plus urodynamic studies were compared by the McNemar test. Of 315 subjects randomized to urodynamic studies after office evaluation 294 had evaluable data. Urodynamic studies changed the office evaluation diagnoses in 167 women (56.8%), decreasing the diagnoses of overactive bladder-wet (41.6% to 25.2%, p <0.001), overactive bladder-dry (31.4% to 20.8%, p = 0.002) and intrinsic sphincter deficiency (19.4% to 12.6%, p = 0.003) but increasing the diagnosis of voiding dysfunction (2.2% to 11.9%, p <0.001). After urodynamic studies physicians canceled surgery in 4 of 294 women (1.4%), changed the incontinence procedure in 13 (4.4%) and planned to modify mid urethral sling tension (more or less obstructive) in 20 women (6.8%). Nonoperative treatment plans changed in 40 of 294 women (14%). Urodynamic study driven treatment plan changes were not associated with treatment success (OR 0.96, 95% CI 0.41, 2.25, p = 0.92) but they were associated with increased postoperative treatment for urge urinary incontinence (OR 3.23, 95% CI 1.46, 7.14, p = 0.004). Urodynamic studies significantly changed clinical diagnoses but infrequently changed the global treatment plan or influenced surgeon decision to cancel, change or modify surgical plans. Global treatment plan changes were associated with increased treatment for postoperative urgency urinary incontinence. Copyright © 2013 American Urological Association Education and Research, Inc. Published by Elsevier Inc. All rights reserved.
Flight assessment of a large supersonic drone aircraft for research use
NASA Technical Reports Server (NTRS)
Eckstrom, C. V.; Peele, E. L.
1974-01-01
An assessment is made of the capabilities of the BQM-34E supersonic drone aircraft as a test bed research vehicle. This assessment is made based on a flight conducted for the purpose of obtaining flight test measurements of wing loads at various maneuver flight conditions. Flight plan preparation, flight simulation, and conduct of the flight test are discussed along with a presentation of the test data obtained and an evaluation of how closely the flight test followed the test plan.
DOT National Transportation Integrated Search
2003-10-02
This document is one of a series of working papers that report on progress for the US DOT evaluation for Phase I of the ORANGES field operational test. Each working paper corresponds to a Phase I task. At the conclusion of Phase I, these documents wi...
ERIC Educational Resources Information Center
Stephens, Thomas W.
Ten mainstreamed learning disabled high school students received treatment with an informal assessment and an educational plan. Analysis of pre and post tests (Peabody Individual Achievement Test, Revised Piers-Harris Self-Concept Scale, and Teacher Perception Survey) indicated that Ss performed better on achievement tests, were enrolled in more…
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
DOT National Transportation Integrated Search
1997-09-01
Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...
Distributing an Online Catalog on CD-ROM...The University of Illinois Experience.
ERIC Educational Resources Information Center
Watson, Paula D.; Golden, Gary A.
1987-01-01
Description of the planning of a project designed to test the feasibility of distributing a statewide union catalog database on optical disk discusses the relationship of the project's goals to those of statewide library development; dealing with vendors in a volatile, high technology industry; and plans for testing and evaluation. (EM)
DOT National Transportation Integrated Search
1979-10-01
A test plan is designed to" (a) evaluate the performance of several types of LORAN-C receivers in the vicinity of both a large metropolitan and a small rural airport, (b) measure the electromagnetic interference in the LORAN-C band (100+/-50 KHZ) at ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham
This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iman, R.L.; Anderson, D.J.; Burress, R.V.
1995-06-01
The LRSTF combined the efforts of industry, military, and government to evaluate low-residue soldering processes for military and commercial applications. These processes were selected for evaluation because they provide a means for the military to support the presidential mandate while producing reliable hardware at a lower cost. This report presents the complete details and results of a testing program conducted by the LRSTF to evaluate low-residue soldering for printed wiring assemblies. A previous informal document provided details of the test plan used in this evaluation. Many of the details of that test plan are contained in this report. The testmore » data are too massive to include in this report, however, these data are available on disk as Excel spreadsheets upon request. The main purpose of low-residue soldering is to eliminate waste streams during the manufacturing process.« less
Stewart, Sherri L.; Angell, William
2013-01-01
Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roper, J; Ghavidel, B; Godette, K
Purpose: To validate a knowledge-based algorithm for prostate LDR brachytherapy treatment planning. Methods: A dataset of 100 cases was compiled from an active prostate seed implant service. Cases were randomized into 10 subsets. For each subset, the 90 remaining library cases were registered to a common reference frame and then characterized on a point by point basis using principle component analysis (PCA). Each test case was converted to PCA vectors using the same process and compared with each library case using a Mahalanobis distance to evaluate similarity. Rank order PCA scores were used to select the best-matched library case. Themore » seed arrangement was extracted from the best-matched case and used as a starting point for planning the test case. Any subsequent modifications were recorded that required input from a treatment planner to achieve V100>95%, V150<60%, V200<20%. To simulate operating-room planning constraints, seed activity was held constant, and the seed count could not increase. Results: The computational time required to register test-case contours and evaluate PCA similarity across the library was 10s. Preliminary analysis of 2 subsets shows that 9 of 20 test cases did not require any seed modifications to obtain an acceptable plan. Five test cases required fewer than 10 seed modifications or a grid shift. Another 5 test cases required approximately 20 seed modifications. An acceptable plan was not achieved for 1 outlier, which was substantially larger than its best match. Modifications took between 5s and 6min. Conclusion: A knowledge-based treatment planning algorithm for prostate LDR brachytherapy is being cross validated using 100 prior cases. Preliminary results suggest that for this size library, acceptable plans can be achieved without planner input in about half of the cases while varying amounts of planner input are needed in remaining cases. Computational time and planning time are compatible with clinical practice.« less
44 CFR 351.25 - The Department of Transportation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation. 351.25 Section 351.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... of radiological emergency plans. (b) Assist FEMA in its review and approval of State and local radiological emergency plans and in the evaluation of exercises to test such plans. (c) Provide guidance and...
44 CFR 351.25 - The Department of Transportation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation. 351.25 Section 351.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... of radiological emergency plans. (b) Assist FEMA in its review and approval of State and local radiological emergency plans and in the evaluation of exercises to test such plans. (c) Provide guidance and...
44 CFR 351.25 - The Department of Transportation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Transportation. 351.25 Section 351.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... of radiological emergency plans. (b) Assist FEMA in its review and approval of State and local radiological emergency plans and in the evaluation of exercises to test such plans. (c) Provide guidance and...
44 CFR 351.25 - The Department of Transportation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation. 351.25 Section 351.25 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... of radiological emergency plans. (b) Assist FEMA in its review and approval of State and local radiological emergency plans and in the evaluation of exercises to test such plans. (c) Provide guidance and...
Director, Operational Test and Evaluation
2007-12-01
important, and all – collectively – are necessary to properly set requirements, incentivize industry, oversee system design and development, and finally...evaluation planning which defines testing required for all system-level evaluation. • Enable access to all system-level test data by government DT...responsible for sustainment cost estimates, and with the OTAs, to contribute relevant data. As with all new missions, there is a question of resources
NASA Astrophysics Data System (ADS)
Purwaningsih, E.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.
Airborne Data Link Operational Evaluation Test Plan
DOT National Transportation Integrated Search
1993-08-01
This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...
Flexible Transcription Testing
ERIC Educational Resources Information Center
Carr-Smith, Norma
1976-01-01
Flexible structure in a San Francisco State University shorthand course is described as a way to provide motivation for students. Topics discussed are transcription testing plan, method of evaluation, practice tests, increasing difficulty of tests, and classroom results. (TA)
Evaluation of spray drift using low speed wind tunnel measurements and dispersion modeling
USDA-ARS?s Scientific Manuscript database
The objective of this work was to evaluate the EPA’s proposed Test Plan for the validation testing of pesticide spray drift reduction technologies (DRTs) for row and field crops, focusing on the evaluation of ground application systems using the low-speed wind tunnel protocols and processing the dat...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haas, J.C.; Olivo, C.A.; Wilson, K.B.
1994-04-01
An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less
Plans for crash-tested bridge railings for longitudinal wood decks
M. A. Ritter; R. K. Faller; P. D. Hilbrich Lee; B. T. Rosson; S. R. Duwadi
1995-01-01
In the past decade, bridge railing design criteria have moved away from static-load design and have focused on full-scale crash testing as a more appropriate and reliable means of evaluating bridge railings. The five bridge railing plans presented reflect the results of a cooperative research project between the Midwest Roadside Safety Facility, University of Nebraska...
NASA Technical Reports Server (NTRS)
Szuch, J. R.; Soeder, J. F.; Seldner, K.; Cwynar, D. S.
1977-01-01
The design, evaluation, and testing of a practical, multivariable, linear quadratic regulator control for the F100 turbofan engine were accomplished. NASA evaluation of the multivariable control logic and implementation are covered. The evaluation utilized a real time, hybrid computer simulation of the engine. Results of the evaluation are presented, and recommendations concerning future engine testing of the control are made. Results indicated that the engine testing of the control should be conducted as planned.
Mechanical behavior of carbon-carbon composites
NASA Technical Reports Server (NTRS)
Rozak, G. A.
1984-01-01
A general background, test plan, and some results of preliminary examinations of a carbon-carbon composite material are presented with emphasis on mechanical testing and inspection techniques. Experience with testing and evaluation was gained through tests of a low modulus carbon-carbon material, K-Karb C. The properties examined are the density - 1.55 g/cc; four point flexure strength in the warp - 137 MPa (19,800 psi) and the fill - 95.1 MPa (13,800 psi,) directions; and the warp interlaminar shear strength - 14.5 MPa (2100 psi). Radiographic evaluation revealed thickness variations and the thinner areas of the composite were scrapped. The ultrasonic C-scan showed attenuation variations, but these did not correspond to any of the physical and mechanical properties measured. Based on these initial tests and a survey of the literature, a plan has been devised to examine the effect of stress on the oxidation behavior, and the strength degradation of coated carbon-carbon composites. This plan will focus on static fatigue tests in the four point flexure mode in an elevated temperature, oxidizing environment.
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
A new plan quality index for nasopharyngeal cancer SIB IMRT.
Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C
2014-02-01
A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p < 0.01). This was consistent with statistical analysis, ROQS results and physician's ranking results in which 90% OAR high plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
30 CFR 582.28 - Environmental protection measures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 582.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality... to be inadequate to support an environmental evaluation of a proposed Delineation, Testing, or Mining...
30 CFR 582.28 - Environmental protection measures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 582.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality... to be inadequate to support an environmental evaluation of a proposed Delineation, Testing, or Mining...
30 CFR 582.28 - Environmental protection measures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Section 582.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality... to be inadequate to support an environmental evaluation of a proposed Delineation, Testing, or Mining...
DOT National Transportation Integrated Search
2000-10-01
The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...
Avionics test bed development plan
NASA Technical Reports Server (NTRS)
Harris, L. H.; Parks, J. M.; Murdock, C. R.
1981-01-01
A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.
Measuring pregnancy planning: A psychometric evaluation and comparison of two scales.
Drevin, Jennifer; Kristiansson, Per; Stern, Jenny; Rosenblad, Andreas
2017-11-01
To psychometrically test the London Measure of Unplanned Pregnancy and compare it with the Swedish Pregnancy Planning Scale. The incidence of unplanned pregnancies is an important indicator of reproductive health. The London Measure of Unplanned Pregnancy measures pregnancy planning by taking contraceptive use, timing, intention to become pregnant, desire for pregnancy, partner agreement, and pre-conceptual preparations into account. It has, however, previously not been psychometrically evaluated using confirmatory factor analysis. The Likert-scored single-item Swedish Pregnancy Planning Scale has been developed to measure the woman's own view of pregnancy planning level. Cross-sectional design. In 2012-2013, 5493 pregnant women living in Sweden were invited to participate in the Swedish Pregnancy Planning study, of whom 3327 (61%) agreed to participate and answered a questionnaire. A test-retest pilot study was conducted in 2011-2012. Thirty-two participants responded to the questionnaire on two occasions 14 days apart. Data were analysed using confirmatory factor analysis, Cohen's weighted kappa and Spearman's correlation. All items of the London Measure of Unplanned Pregnancy contributed to measuring pregnancy planning, but four items had low item-reliability. The London Measure of Unplanned Pregnancy and Swedish Pregnancy Planning Scale corresponded reasonably well with each other and both showed good test-retest reliability. The London Measure of Unplanned Pregnancy may benefit from item reduction and its usefulness may be questioned. The Swedish Pregnancy Planning Scale is time-efficient and shows acceptable reliability and construct validity, which makes it more useful for measuring pregnancy planning. © 2017 John Wiley & Sons Ltd.
ERIC Educational Resources Information Center
Berney, Mary F.
Plans for the field-testing and implementation of the Accreditation Plus Model (APM) for evaluation of teacher preparation programs are described. Field-testing is taking place in the Center for Teacher Education Evaluation at Tennessee Technological University (Cookeville). The APM is based on the professional judgment approach to program…
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
Eriksson, J; Ek, A; Johansson, G
2000-03-01
A software prototype to support the planning process for adapting home and work environments for people with physical disabilities was designed and later evaluated. The prototype exploits low-cost three-dimensional (3-D) graphics products in the home computer market. The essential features of the prototype are: interactive rendering with optional hardware acceleration, interactive walk-throughs, direct manipulation tools for moving objects and measuring distances, and import of 3-D-objects from a library. A usability study was conducted, consisting of two test sessions (three weeks apart) and a final interview. The prototype was then tested and evaluated by representatives of future users: five occupational therapist students, and four persons with physical disability, with no previous experience of the prototype. Emphasis in the usability study was placed on the prototype's efficiency and learnability. We found that it is possible to realise a planning tool for environmental adaptations, both regarding usability and technical efficiency. The usability evaluation confirms our findings from previous case studies, regarding the relevance and positive attitude towards this kind of planning tool. Although the prototype was found to be satisfactorily efficient for the basic tasks, the paper presents several suggestions for improvement of future prototype versions.
Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations
NASA Technical Reports Server (NTRS)
Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, Dave
2016-01-01
From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Primary Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. A key aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Intermittent and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5 testing.
2013-02-01
or funds authorized under Section 219(a) for projects costing no more than $4M. Research , Development, Test , and Evaluation (RDT&E) Appropriations...The RDT&E appropriation consists of the mission program budgets for all research , development, test and evaluation work performed by contractors...carry out an unspecified minor military construction project costing not more than $4,000,000. 9 f. Research , Development, Test , and Evaluation
Technical Evaluation Motor No. 10 (TEM-10)
NASA Technical Reports Server (NTRS)
1993-01-01
Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yu, J; Thomas Jefferson UniversityHospital, Philadelphia, PA; Hardcastle, N
Purpose: To explore the feasibility of pretreatment test for iso-NTCP DGART and to compare the pretreatment test results with post-treatment evaluations. Methods: NTCP here refers to late rectal wall toxicity only and is calculated with the ring rectal wall DVH. Simulation for one time iso- NTCP DGART starts after half of the total dose was done for 10 patients to investigate if TCP gains could be achieved. Six patients were treated using a 12-fraction 4.3Gy technique and four using 16-fraction 3.63Gy technique. For each of the 12-fraction cases a VMAT plan was generated in Pinnacle3™ using the daily CT obtainedmore » prior to the 6th fraction. A pretreatment simulation was performed using only the first 6 daily CTs. The idea is to add the 6 original plan delivered doses with 6 DGART plan delivered doses by deformable dose accumulation (DDA) on each of the first 6 CTs, resulting in 6 rectal wall doses (RWDs) and NTCPs. The 95% confidence interval (95%CI) for the 6 NTCPs were computed.The posttreatment evaluation was done by: a) copy the DGART plan to 6 CTs for fraction 7–12 and calculate the 6 actual DGART delivered fractional doses; b) sum the 6 actual DGART doses with the 6 original plan delivered doses by DDA on each of the 12 CTs resulting in 12 post-treatment RWDs and NTCPs; c) boxplot the 12 post-treatment NTCPs. Results: Target dose gain is 0.76–1.93 Gy. The 95%CI widths of the pretreatment tests NTCPs were 1.1–2.7%. For 5 patients, the planned NTCP fell within the 95%CI. For 4 patients, the planned NTCP was lower than the 95%CI lines. Post-treatment results show that for 7 patients, the upper quartile was within the 95%CI; for 2 patients, the upper quartile were higher than the 95%CI. Conclusion: The pretreatment test yields conservative prediction of the actual delivered NTCP.« less
NASA Technical Reports Server (NTRS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.;
2016-01-01
NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
NASA Astrophysics Data System (ADS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.
2016-09-01
NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
Thin film temperature sensors, phase 3. [for engine-test evaluation
NASA Technical Reports Server (NTRS)
Grant, H. P.; Przybyszewski, J. S.; Claing, R. G.; Anderson, W. L.
1982-01-01
A thin film thermocouple system installation suitable for engine test evaluation was designed, and an engine test plan was prepared. Film adherence, durability, accuracy, and drift characteristics were improved. Film thickness was increased to 14 microns, and drift was reduced to less than 0.02 percent of Fahrenheit temperature per hour on actual turbine blades at 1255 K.
Human Factors Evaluations of Two-Dimensional Spacecraft Conceptual Layouts
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Toups, Larry D.; Rudisill, Marianne
2010-01-01
Much of the human factors work done in support of the NASA Constellation lunar program has been with low fidelity mockups. These volumetric replicas of the future lunar spacecraft allow researchers to insert test subjects from the engineering and astronaut population and evaluate the vehicle design as the test subjects perform simulations of various operational tasks. However, lunar outpost designs must be evaluated without the use of mockups, creating a need for evaluation tools that can be performed on two-dimension conceptual spacecraft layouts, such as floor plans. A tool based on the Cooper- Harper scale was developed and applied to one lunar scenario, enabling engineers to select between two competing floor plan layouts. Keywords: Constellation, human factors, tools, processes, habitat, outpost, Net Habitable Volume, Cooper-Harper.
ERIC Educational Resources Information Center
MCKEE, ROBERT L.; RIDLEY, KATHRYN J.
TO ESTABLISH A COLLEGE IN 100 DAYS PRESENTED AN OPPORTUNITY TO TEST THE VALUE OF PROGRAMED ORGANIZATIONAL PROCEDURES USING PROGRAM PERFORMANCE EVALUATION AND REVIEW TECHNIQUE (PERT) UNDER ACTUAL OPERATIONAL CONDITIONS, NOT IN A SIMULATED THEORETICAL SITUATION. THROUGH THE AID OF THE PERT PLANNING SYSTEM, IT WAS DETERMINED THAT THERE WERE NINE…
Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.
2015-09-29
This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.
NASA Technical Reports Server (NTRS)
Wilson, D. J.; Krause, M. C.; Craven, C. E.; Edwards, B. B.; Coffey, E. W.; Huang, C. C.; Jetton, J. L.; Morrison, L. K.
1974-01-01
A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.
A review of selection-based tests of abiotic surrogates for species representation.
Beier, Paul; Sutcliffe, Patricia; Hjort, Jan; Faith, Daniel P; Pressey, Robert L; Albuquerque, Fabio
2015-06-01
Because conservation planners typically lack data on where species occur, environmental surrogates--including geophysical settings and climate types--have been used to prioritize sites within a planning area. We reviewed 622 evaluations of the effectiveness of abiotic surrogates in representing species in 19 study areas. Sites selected using abiotic surrogates represented more species than an equal number of randomly selected sites in 43% of tests (55% for plants) and on average improved on random selection of sites by about 8% (21% for plants). Environmental diversity (ED) (42% median improvement on random selection) and biotically informed clusters showed promising results and merit additional testing. We suggest 4 ways to improve performance of abiotic surrogates. First, analysts should consider a broad spectrum of candidate variables to define surrogates, including rarely used variables related to geographic separation, distance from coast, hydrology, and within-site abiotic diversity. Second, abiotic surrogates should be defined at fine thematic resolution. Third, sites (the landscape units prioritized within a planning area) should be small enough to ensure that surrogates reflect species' environments and to produce prioritizations that match the spatial resolution of conservation decisions. Fourth, if species inventories are available for some planning units, planners should define surrogates based on the abiotic variables that most influence species turnover in the planning area. Although species inventories increase the cost of using abiotic surrogates, a modest number of inventories could provide the data needed to select variables and evaluate surrogates. Additional tests of nonclimate abiotic surrogates are needed to evaluate the utility of conserving nature's stage as a strategy for conservation planning in the face of climate change. © 2015 Society for Conservation Biology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea
2013-05-01
Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-13
... CBP with authority to conduct limited test programs or procedures designed to evaluate planned... aspects of this test, including the design, conduct and implementation of the test, in order to determine... Environment (ACE); Announcement of National Customs Automation Program Test of Automated Procedures for In...
40 CFR 63.7752 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (3) Records of performance tests and performance evaluations as required by § 63.10(b)(2)(viii). (4... cores, the Material Data Safety Sheet or other documentation that provides the chemical composition of... evaluation plan as required in § 63.8(d)(3). (3) Request for alternatives to relative accuracy tests for CEMS...
F-35 Pollution Prevention Activities
2008-02-26
Cover Page Bushing Replacement Lab Testing • F-35 Evaluation of Alternative Materials – ToughMet, Nitronic 50 /60, 304/HBN, SBIR Developed, etc...Completed SCC and Salt Fog exposure – All F-35 Bushings ɚ.5”Ø Switched to Cold Worked Nitronic 60 – Phase 5 test plan Evaluating Installation Issues • ASC
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... efforts are accomplished through phased releases of ACE component functionality designed to introduce new... designed to evaluate planned components of the NCAP. This test is authorized pursuant to Sec. 101.9(b) of... import meat, poultry, or egg products or ``Samples for Laboratory Examination, Research, Evaluative...
DOT National Transportation Integrated Search
2017-10-25
The Task 8 D2X Hub Proof-of-Concept Test Evaluation Report provides results of the experimental data analysis performed in accordance with the experimental plan for the proof-of-concept version of the prototype system. The data set analyzed includes ...
Flight test and evaluation of Omega navigation in a general aviation aircraft. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Howell, J. D.; Hoffman, W. C.; Hwoschinsky, P. V.; Wischmeyer, C. E.
1975-01-01
Detailed documentation for each flight of the Omega Flight Evaluation study is presented, including flight test description sheets and actual flight data plots. Computer programs used for data processing and flight planning are explained and the data formats utilized by the Custom Interface Unit are summarized.
An Analysis of Test And Evaluation in Rapid Acquisition Programs
2015-12-01
program manager is assigned the requirement and allocated resources to carry out with an acquisition plan. 2. Role of Test and Evaluation Test and...Manual, verify the Maintenance Allocation Chart, and ensure the completeness of the System Support Package. The Maintainability Demonstration measured...additional outside personnel that require additional logistics support, such as security, facilitates, and berthing placing additional strain on units. CLS
Software Master Plan. Volume 2. Background (Annexes A-G)
1990-02-09
AFLC is also responsible for the support of the Avionics Integration Support Facilities, the pilot training systems support and the Automatic Test ...Deputy Director of Defense Research and Engineering ( Test & Evaluation) ..... ............ A.1.1.3 Office of the Deputy Director of Defense Research and...Department of Defense .... ........ 3 A.3 Operational Test & Evaluation ........ ................. 4 A.4 Office of the Assistant Secretary of Defense
Director, Operational Test and Evaluation FY 2015 Annual Report
2016-01-01
review. For example, where a wind turbine project was found to have the potential to seriously degrade radar cross section testing at the Naval Air...Assessment Plan U.S. Special Operations Command Tempest Wind 2015 Assessment Plan U.S. Transportation Command Turbo Challenge 2015 Final Assessment...U.S. Air Forces Central Command 2015 May 2015 U.S. Special Operations Command-Pacific Tempest Wind 2014 May 2015 North American Aerospace Defense
Supporting the Use of CERT (registered trademark) Secure Coding Standards in DoD Acquisitions
2012-07-01
Capability Maturity Model IntegrationSM (CMMI®) [Davis 2009]. SM Team Software Process, TSP, and Capability Maturity Model Integration are service...STP Software Test Plan TEP Test and Evaluation Plan TSP Team Software Process V & V verification and validation CMU/SEI-2012-TN-016 | 47...Supporting the Use of CERT® Secure Coding Standards in DoD Acquisitions Tim Morrow ( Software Engineering Institute) Robert Seacord ( Software
NASA Technical Reports Server (NTRS)
1971-01-01
A comprehensive test plan for determining the hazards associated with pyrotechnic manufacturing processes is presented. The rationale for each test is based on a systematic analysis of historical accounts of accidents and a detailed study of the characteristics of each manufacturing process. The most hazardous manufacturing operations have been determined to be pressing, mixing, reaming, and filling. The hazard potential of a given situation is evaluated in terms of the probabilities of initiation, communication, and transition to detonation (ICT). The characteristics which affect the ICT probabilities include the ignition mechanisms which are present either in normal or abnormal operation, the condition and properties of the pyrotechnic material, and the configuration of the processing equipment. Analytic expressions are derived which describe the physical conditions of the system, thus permitting a variety of processes to be evaluated in terms of a small number of experiments.
Effect of Sampling Plans on the Risk of Escherichia coli O157 Illness.
Kiermeier, Andreas; Sumner, John; Jenson, Ian
2015-07-01
Australia exports about 150,000 to 200,000 tons of manufacturing beef to the United States annually. Each lot is tested for Escherichia coli O157 using the N-60 sampling protocol, where 60 small pieces of surface meat from each lot of production are tested. A risk assessment of E. coli O157 illness from the consumption of hamburgers made from Australian manufacturing meat formed the basis to evaluate the effect of sample size and amount on the number of illnesses predicted. The sampling plans evaluated included no sampling (resulting in an estimated 55.2 illnesses per annum), the current N-60 plan (50.2 illnesses), N-90 (49.6 illnesses), N-120 (48.4 illnesses), and a more stringent N-60 sampling plan taking five 25-g samples from each of 12 cartons (47.4 illnesses per annum). While sampling may detect some highly contaminated lots, it does not guarantee that all such lots are removed from commerce. It is concluded that increasing the sample size or sample amount from the current N-60 plan would have a very small public health effect.
Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations
NASA Technical Reports Server (NTRS)
Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, David
2016-01-01
From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Portable Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. One aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Periodic and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5.
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.A.
1983-05-01
This report describes Phase I of a study of the fouling of condensing heat exchangers in residential oil-fired boiler and furnaces. The first phase consists of a review of available information on soot information in residential systems and the preparation of a work plan for Phase II. In the literature review the effects of burner type, startup and shutdown, time from tuning, fuel quality, combustion chambers, nozzles, and fuel additives are discussed. While data are available on soot emissions with current burners and fuels there are limited data available on advanced burners and degraded fuels with modern burners. The Phasemore » II work will provide an evaluation of the need for the development of advanced burner concepts for oil-fired condensing systems. Planned experimental work includes a furnace draft optimization study, extended fouling tests, a blue flame/yellow flame comparative test, and some degraded fuel teste.« less
Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Schaschl, Leslie
2011-01-01
The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.
Ruland, C M; Ravn, I H
2001-01-01
An important strategy for improving resource management and cost containment in health care is to develop information systems that assist hospital managers in financial management, resource allocation, and activity planning. A crucial part of such development is a rigorous evaluation to assess whether the system accomplishes it's intended goals. To evaluate CLASSICA, a Decision Support System (DSS), that assists nurse managers in financial management, resource allocation, staffing, and activity planning. Using a pre-post test design with control units, CLASSICA was evaluated in four test units. Baseline data and simultaneous parallel measures were collected prior to system implementation at test sites and control units. Using expense reports, staffing and financial statistics, surveys, interviews with nurse managers, and logs as data sources, CLASSICA was evaluated on: cost reduction, quality of management information; usefulness as decision support for improved financial management and decision-making; user satisfaction; and ease of use. Evaluation results showed a 41% reduction in expenditures for overtime and extra hours as compared to a 1.8% reduction in control units during the same time period. Users reported a significant improvement in management information; nurse managers stated that they had gained control over costs. The system helped them analyze the relationships between patient activity staffing, and cost of care. Users reported high satisfaction with the system, the information and decision support it provided, and its ease of use. These results suggest that CLASSICA is a DSS that successfully assists nurse managers in cost effective management of their units.
Xiao, Zhiyan; Zou, Wei J; Chen, Ting; Yue, Ning J; Jabbour, Salma K; Parikh, Rahul; Zhang, Miao
2018-03-01
The goal of this study was to exam the efficacy of current DVH based clinical guidelines draw from photon experience for lung cancer radiation therapy on proton therapy. Comparison proton plans and IMRT plans were generated for 10 lung patients treated in our proton facility. A gEUD based plan evaluation method was developed for plan evaluation. This evaluation method used normal lung gEUD(a) curve in which the model parameter "a" was sampled from the literature reported value. For all patients, the proton plans delivered lower normal lung V 5 Gy with similar V 20 Gy and similar target coverage. Based on current clinical guidelines, proton plans were ranked superior to IMRT plans for all 10 patients. However, the proton and IMRT normal lung gEUD(a) curves crossed for 8 patients within the tested range of "a", which means there was a possibility that proton plan would be worse than IMRT plan for lung sparing. A concept of deficiency index (DI) was introduced to quantify the probability of proton plans doing worse than IMRT plans. By applying threshold on DI, four patients' proton plan was ranked inferior to the IMRT plan. Meanwhile if a threshold to the location of curve crossing was applied, 6 patients' proton plan was ranked inferior to the IMRT plan. The contradictory ranking results between the current clinical guidelines and the gEUD(a) curve analysis demonstrated there is potential pitfalls by applying photon experience directly to the proton world. A comprehensive plan evaluation based on radio-biological models should be carried out to decide if a lung patient would really be benefit from proton therapy. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
Phase 2 STS new user development program. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Mcdowell, J. R.
1976-01-01
A methodology for developing new users for STS other than NASA and DoD, thereby maximizing the use of the STS system was developed. The approach to user development, reflected in the implementation plan, and attendant informational material to be used were evaluated by conducting a series of test cases with selected user organizations. These test case organizations were, in effect, used as consultants to evaluate the effectiveness, the needs, the completeness, and the adequacy of the user development approach and informational material. The selection of the test cases provided a variety of potential STS users covering industry, other government agencies, and the educational sector. The test cases covered various use areas and provided a mix of user organization types. A summary of the actual test cases conducted is given. The conduct of the test cases verified the general approach of the implementation plan, the validity of the user development strategy prepared for each test case organization and the effectiveness of the STS basic and user customized informational material.
Phase II test plan for the evaluation of the performance of container filling systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOGER, R.M.
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples andmore » will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.« less
Development of an Experiment High Performance Nozzle Research Program
NASA Technical Reports Server (NTRS)
2004-01-01
As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).
Borba, Alexandre Meireles; Haupt, Dustin; de Almeida Romualdo, Leiliane Teresinha; da Silva, André Luis Fernandes; da Graça Naclério-Homem, Maria; Miloro, Michael
2016-09-01
Virtual surgical planning (VSP) has become routine practice in orthognathic treatment planning; however, most surgeons do not perform the planning without technical assistance, nor do they routinely evaluate the accuracy of the postoperative outcomes. The purpose of the present study was to propose a reproducible method that would allow surgeons to have an improved understanding of VSP orthognathic planning and to compare the planned surgical movements with the results obtained. A retrospective cohort of bimaxillary orthognathic surgery cases was used to evaluate the variability between the predicted and obtained movements using craniofacial landmarks and McNamara 3-dimensional cephalometric analysis from computed tomography scans. The demographic data (age, gender, and skeletal deformity type) were gathered from the medical records. The data analysis included the level of variability from the predicted to obtained surgical movements as assessed by the mean and standard deviation. For the overall sample, statistical analysis was performed using the 1-sample t test. The statistical analysis between the Class II and III patient groups used an unpaired t test. The study sample consisted of 50 patients who had undergone bimaxillary orthognathic surgery. The overall evaluation of the mean values revealed a discrepancy between the predicted and obtained values of less than 2.0 ± 2.0 mm for all maxillary landmarks, although some mandibular landmarks were greater than this value. An evaluation of the influence of gender and deformity type on the accuracy of surgical movements did not demonstrate statistical significance for most landmarks (P > .05). The method provides a reproducible tool for surgeons who use orthognathic VSP to perform routine evaluation of the postoperative outcomes, permitting the identification of specific variables that could assist in improving the accuracy of surgical planning and execution. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.
Technical Evaluation Motor No. 7 (TEM-7)
NASA Technical Reports Server (NTRS)
Hughes, Phil
1991-01-01
The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.
NASA Astrophysics Data System (ADS)
Das, K.; Clune, T.; Kuo, K. S.; Mattmann, C. A.; Huang, T.; Duffy, D.; Yang, C. P.; Habermann, T.
2015-12-01
Data containers are infrastructures that facilitate storage, retrieval, and analysis of data sets. Big data applications in Earth Science require a mix of processing techniques, data sources and storage formats that are supported by different data containers. Some of the most popular data containers used in Earth Science studies are Hadoop, Spark, SciDB, AsterixDB, and RasDaMan. These containers optimize different aspects of the data processing pipeline and are, therefore, suitable for different types of applications. These containers are expected to undergo rapid evolution and the ability to re-test, as they evolve, is very important to ensure the containers are up to date and ready to be deployed to handle large volumes of observational data and model output. Our goal is to develop an evaluation plan for these containers to assess their suitability for Earth Science data processing needs. We have identified a selection of test cases that are relevant to most data processing exercises in Earth Science applications and we aim to evaluate these systems for optimal performance against each of these test cases. The use cases identified as part of this study are (i) data fetching, (ii) data preparation for multivariate analysis, (iii) data normalization, (iv) distance (kernel) computation, and (v) optimization. In this study we develop a set of metrics for performance evaluation, define the specifics of governance, and test the plan on current versions of the data containers. The test plan and the design mechanism are expandable to allow repeated testing with both new containers and upgraded versions of the ones mentioned above, so that we can gauge their utility as they evolve.
Construction and Analysis of Classroom Tests.
ERIC Educational Resources Information Center
Izard, J. F.
This material provides a discussion of the construction and analysis of tests prepared for classroom use by teachers. The initial discussion is concerned with the purposes of evaluation and the specification of objectives. This is followed by an examination of theoretical and practical considerations in planning a test. The material on test item…
PDCI Wide-Area Damping Control: PSLF Simulations of the 2016 Open and Closed Loop Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilches Bernal, Felipe; Pierre, Brian Joseph; Elliott, Ryan Thomas
To demonstrate and validate the performance of the wide-are a damping control system, the project plans to conduct closed-loop tests on the PDCI in summer/fall 2016. A test plan details the open and closed loop tests to be conducted on the P DCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the result s from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations usemore » the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases.« less
PATRAM '80. Proceedings. Volume 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huebner, H.W.
1980-01-01
Volume 2 contains papers from the following sessions: Safeguards-Related Problems; Neutronics and Criticality; Operations and Systems Experience II; Plutonium Systems; Intermediate Storage in Casks; Operations and Systems Planning; Institutional Issues; Structural and Thermal Evaluation I; Poster Session B; Extended Testing I; Structural and Thermal Evaluation II; Extended Testing II; and Emergency Preparedness and Response. Individual papers were processed. (LM)
NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests
NASA Technical Reports Server (NTRS)
Barta, Daniel J.; Montz, Michael E.
2004-01-01
NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).
Field Test of the Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).
National Aeronautics Research, Development, Test and Evaluation (RDT&E) Infrastructure Plan
2011-01-01
addressed in the National Aeronautics R&D Plan, identi- fying unnecessary redundancy solely on the basis of infrastructure required to support H H13 ...near, mid, and far terms, and impact not only scramjet propulsion systems, but potential turbine-based combined cycle systems as well. Turbine Engine...Icing Test Facilities A greater understanding of the impact that icing conditions have on turbine engine opera- tions is needed to develop enhanced
Choosing a reliability inspection plan for interval censored data
Lu, Lu; Anderson-Cook, Christine Michaela
2017-04-19
Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less
Choosing a reliability inspection plan for interval censored data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lu, Lu; Anderson-Cook, Christine Michaela
Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less
48 CFR 11.801 - Preaward in-use evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Preaward in-use evaluation. 11.801 Section 11.801 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Testing 11.801 Preaward in-use evaluation. Supplies may be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nicolae, A; Department of Physics, Ryerson University, Toronto, ON; Lu, L
Purpose: A novel, automated, algorithm for permanent prostate brachytherapy (PPB) treatment planning has been developed. The novel approach uses machine-learning (ML), a form of artificial intelligence, to substantially decrease planning time while simultaneously retaining the clinical intuition of plans created by radiation oncologists. This study seeks to compare the ML algorithm against expert-planned PPB plans to evaluate the equivalency of dosimetric and clinical plan quality. Methods: Plan features were computed from historical high-quality PPB treatments (N = 100) and stored in a relational database (RDB). The ML algorithm matched new PPB features to a highly similar case in the RDB;more » this initial plan configuration was then further optimized using a stochastic search algorithm. PPB pre-plans (N = 30) generated using the ML algorithm were compared to plan variants created by an expert dosimetrist (RT), and radiation oncologist (MD). Planning time and pre-plan dosimetry were evaluated using a one-way Student’s t-test and ANOVA, respectively (significance level = 0.05). Clinical implant quality was evaluated by expert PPB radiation oncologists as part of a qualitative study. Results: Average planning time was 0.44 ± 0.42 min compared to 17.88 ± 8.76 min for the ML algorithm and RT, respectively, a significant advantage [t(9), p = 0.01]. A post-hoc ANOVA [F(2,87) = 6.59, p = 0.002] using Tukey-Kramer criteria showed a significantly lower mean prostate V150% for the ML plans (52.9%) compared to the RT (57.3%), and MD (56.2%) plans. Preliminary qualitative study results indicate comparable clinical implant quality between RT and ML plans with a trend towards preference for ML plans. Conclusion: PPB pre-treatment plans highly comparable to those of an expert radiation oncologist can be created using a novel ML planning model. The use of an ML-based planning approach is expected to translate into improved PPB accessibility and plan uniformity.« less
Flight test evaluation of the E-systems Differential GPS category 3 automatic landing system
NASA Technical Reports Server (NTRS)
Kaufmann, David N.; Mcnally, B. David
1995-01-01
Test flights were conducted to evaluate the capability of Differential Global Positioning System (DGPS) to provide the accuracy and integrity required for International Civil Aviation Organization (ICAO) Category (CAT) III precision approach and landings. These test flights were part of a Federal Aviation Administration (FAA) program to evaluate the technical feasibility of using DGPS based technology for CAT III precision approach and landing applications. An IAI Westwind 1124 aircraft (N24RH) was equipped with DGPS receiving equipment and additional computing capability provided by E-Systems. The test flights were conducted at NASA Ames Research Center's Crows Landing Flight Facility, Crows Landing, California. The flight test evaluation was based on completing 100 approaches and landings. The navigation sensor error accuracy requirements were based on ICAO requirements for the Microwave Landing System (MLS). All of the approaches and landings were evaluated against ground truth reference data provided by a laser tracker. Analysis of these approaches and landings shows that the E-Systems DGPS system met the navigation sensor error requirements for a successful approach and landing 98 out of 100 approaches and landings, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan. In addition, the E-Systems DGPS system met the integrity requirements for a successful approach and landing or stationary trial for all 100 approaches and landings and all ten stationary trials, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan.
Fogliata, Antonella; Nicolini, Giorgia; Clivio, Alessandro; Vanetti, Eugenio; Laksar, Sarbani; Tozzi, Angelo; Scorsetti, Marta; Cozzi, Luca
2015-10-31
To evaluate the performance of a broad scope model-based optimisation process for volumetric modulated arc therapy applied to esophageal cancer. A set of 70 previously treated patients in two different institutions, were selected to train a model for the prediction of dose-volume constraints. The model was built with a broad-scope purpose, aiming to be effective for different dose prescriptions and tumour localisations. It was validated on three groups of patients from the same institution and from another clinic not providing patients for the training phase. Comparison of the automated plans was done against reference cases given by the clinically accepted plans. Quantitative improvements (statistically significant for the majority of the analysed dose-volume parameters) were observed between the benchmark and the test plans. Of 624 dose-volume objectives assessed for plan evaluation, in 21 cases (3.3 %) the reference plans failed to respect the constraints while the model-based plans succeeded. Only in 3 cases (<0.5 %) the reference plans passed the criteria while the model-based failed. In 5.3 % of the cases both groups of plans failed and in the remaining cases both passed the tests. Plans were optimised using a broad scope knowledge-based model to determine the dose-volume constraints. The results showed dosimetric improvements when compared to the benchmark data. Particularly the plans optimised for patients from the third centre, not participating to the training, resulted in superior quality. The data suggests that the new engine is reliable and could encourage its application to clinical practice.
Technical Evaluation Motor No. 7 (TEM-07)
NASA Technical Reports Server (NTRS)
Hugh, Phil
1991-01-01
Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.
Northeast Florida rural transit intelligent transportation system (ITS) : evaluation plan
DOT National Transportation Integrated Search
2001-05-01
The Northeast Florida Rural Transportation Intelligent Transportation System (ITS) project is a demonstration of ITS deployment in five rural Community Transportation Coordinator (CTC) agencies. The objective of the project is to test and evaluate th...
ResearchMaps.org for integrating and planning research.
Matiasz, Nicholas J; Wood, Justin; Doshi, Pranay; Speier, William; Beckemeyer, Barry; Wang, Wei; Hsu, William; Silva, Alcino J
2018-01-01
To plan experiments, a biologist needs to evaluate a growing set of empirical findings and hypothetical assertions from diverse fields that use increasingly complex techniques. To address this problem, we operationalized principles (e.g., convergence and consistency) that biologists use to test causal relations and evaluate experimental evidence. With the framework we derived, we then created a free, open-source web application that allows biologists to create research maps, graph-based representations of empirical evidence and hypothetical assertions found in research articles, reviews, and other sources. With our ResearchMaps web application, biologists can systematically reason through the research that is most important to them, as well as evaluate and plan experiments with a breadth and precision that are unlikely without such a tool.
ResearchMaps.org for integrating and planning research
Speier, William; Beckemeyer, Barry; Wang, Wei; Hsu, William; Silva, Alcino J.
2018-01-01
To plan experiments, a biologist needs to evaluate a growing set of empirical findings and hypothetical assertions from diverse fields that use increasingly complex techniques. To address this problem, we operationalized principles (e.g., convergence and consistency) that biologists use to test causal relations and evaluate experimental evidence. With the framework we derived, we then created a free, open-source web application that allows biologists to create research maps, graph-based representations of empirical evidence and hypothetical assertions found in research articles, reviews, and other sources. With our ResearchMaps web application, biologists can systematically reason through the research that is most important to them, as well as evaluate and plan experiments with a breadth and precision that are unlikely without such a tool. PMID:29723213
ERIC Educational Resources Information Center
Yuzdepski, I., Comp.; Elliott, L., Comp.
This document presents information, in the form of summary sheets, on 54 teacher evaluation instruments. Each summary contains pertinent information about the instrument regarding publishing company, author, criteria evaluated, subject of observation, category dimension, and coding units. The 19 criteria used in the evaluation tests, which were…
Human Factors Evaluation of Advanced Electric Power Grid Visualization Tools
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greitzer, Frank L.; Dauenhauer, Peter M.; Wierks, Tamara G.
This report describes initial human factors evaluation of four visualization tools (Graphical Contingency Analysis, Force Directed Graphs, Phasor State Estimator and Mode Meter/ Mode Shapes) developed by PNNL, and proposed test plans that may be implemented to evaluate their utility in scenario-based experiments.
A Perspective on Development Flight Instrumentation and Flight Test Analysis Plans for Ares I-X
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Richards, James S.; Brunty, Joseph A.; Smith, R. Marshall; Trombetta, Dominic R.
2009-01-01
NASA. s Constellation Program will take a significant step toward completion of the Ares I crew launch vehicle with the flight test of Ares I-X and completion of the Ares I-X post-flight evaluation. The Ares I-X flight test vehicle is an ascent development flight test that will acquire flight data early enough to impact the design and development of the Ares I. As the primary customer for flight data from the Ares I-X mission, Ares I has been the major driver in the definition of the Development Flight Instrumentation (DFI). This paper focuses on the DFI development process and the plans for post-flight evaluation of the resulting data to impact the Ares I design. Efforts for determining the DFI for Ares I-X began in the fall of 2005, and significant effort to refine and implement the Ares I-X DFI has been expended since that time. This paper will present a perspective in the development and implementation of the DFI. Emphasis will be placed on the process by which the list was established and changes were made to that list due to imposed constraints. The paper will also discuss the plans for the analysis of the DFI data following the flight and a summary of flight evaluation tasks to be performed in support of tools and models validation for design and development.
Ride Dynamics and Evaluation of Human Exposure to Whole Body Vibration. Change 1
2012-04-03
vehicle specification and/or the detailed test plan. This (half-round obstacle) accelerometer will be low-pass filtered ( post test ) at 30 Hz...Engineers TARADCOM Tank-Automotive Research and Development Command TOP Test Operations Procedure VDV Vibration Dose Value WBV Whole Body...
Overseas testing of a multisensor landmine detection system: results and lessons learned
NASA Astrophysics Data System (ADS)
Keranen, Joe G.; Topolosky, Zeke
2009-05-01
The Nemesis detection system has been developed to provide an efficient and reliable unmanned, multi-sensor, groundbased platform to detect and mark landmines. The detection system consists of two detection sensor arrays: a Ground Penetrating Synthetic Aperture Radar (GPSAR) developed by Planning Systems, Inc. (PSI) and an electromagnetic induction (EMI) sensor array developed by Minelab Electronics, PTY. Limited. Under direction of the Night Vision and Electronic Sensors Directorate (NVESD), overseas testing was performed at Kampong Chhnang Test Center (KCTC), Cambodia, from May 12-30, 2008. Test objectives included: evaluation of detection performance, demonstration of real-time visualization and alarm generation, and evaluation of system operational efficiency. Testing was performed on five sensor test lanes, each consisting of a unique soil mixture and three off-road lanes which include curves, overgrowth, potholes, and non-uniform lane geometry. In this paper, we outline the test objectives, procedures, results, and lessons learned from overseas testing. We also describe the current state of the system, and plans for future enhancements and modifications including clutter rejection and feature-level fusion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Jamie D.
2012-05-30
The purpose of the Operational Testing and Evaluation (OT&E) phases of the project is to prepare for turnover of the Megaports System supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)—located at the Export Lanes of the Port of Lazaro Cardenas, Mexico—to the Government of Mexico (GOM).
2014-08-01
Revisions based on IRR findings and rater comments Charge of Quarters (CQ) Duty Requires the subject to organize and implement a plan in order to...to evaluate test burden) and malingering are planned . Where feasible, test-retest reliability for several of the tasks is being assessed during...in either a shopping mall or hospital lobby setting (Alderman, Burgess,Knight,&Henman, 2003;Cuberos- Urbano et al., 2013; Dawson et al., 2009
Personnel Requirements Consideration in Major Weapon System Acquisition. Research Planning Report
1980-03-01
of scientific study of human attributes associated with job performance. Sir Francis Galton (1822-1911) is considered the father of engineering...analysis of nonrelevant factors. Implementation of this plan will result in construction and pilot testing of a computer based branching decision...logic in 1980-81 and field testing and evaluation in 1981-82. . . 1. SSCuaITY CLASIPICATION Op TuiS PAOI(’I.A baa. Seoto, I Finch, F.L., Rigg, K.E. and
Mod-2 wind turbine system cluster research test program. Volume 1: Initial plan E-1290
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1982-01-01
Upon completion of the design and development of three Mod-2 wind turbines, a series of research experiments are planned to gather data on and evaluate the performance, environmental effects, and operation of a cluster as well as a single, large multimegawatt wind turbine. Information on the program objectives, a Mod-2 system description, a planned schedule, organizational roles, and responsibilities, is included.
Numerical aerodynamic simulation program long haul communications prototype
NASA Technical Reports Server (NTRS)
Cmaylo, Bohden K.; Foo, Lee
1987-01-01
This document is a report of the Numerical Aerodynamic Simulation (NAS) Long Haul Communications Prototype (LHCP). It describes the accomplishments of the LHCP group, presents the results from all LHCP experiments and testing activities, makes recommendations for present and future LHCP activities, and evaluates the remote workstation accesses from Langley Research Center, Lewis Research Center, and Colorado State University to Ames Research Center. The report is the final effort of the Long Haul (Wideband) Communications Prototype Plan (PT-1133-02-N00), 3 October 1985, which defined the requirements for the development, test, and operation of the LHCP network and was the plan used to evaluate the remote user bandwidth requirements for the Numerical Aerodynamic Simulation Processing System Network.
Thermal-Mechanical Cyclic Test of a Composite Cryogenic Tank for Reusable Launch Vehicles
NASA Technical Reports Server (NTRS)
Messinger, Ross; Pulley, John
2003-01-01
This viewgraph presentation provides an overview of thermal-mechanical cyclic tests conducted on a composite cryogenic tank designed for reusable launch vehicles. Topics covered include: a structural analysis of the composite cryogenic tank, a description of Marshall Space Flight Center's Cryogenic Structure Test Facility, cyclic test plans and accomplishments, burst test and analysis and post-testing evaluation.
Williams, Janet L; Faucett, W Andrew; Smith-Packard, Bethanny; Wagner, Monisa; Williams, Marc S
2014-08-01
Whole genome sequencing (WGS) is being used for evaluation of individuals with undiagnosed disease of suspected genetic origin. Implementing WGS into clinical practice will place an increased burden upon care teams with regard to pre-test patient education and counseling about results. To quantitate the time needed for appropriate pre-test evaluation of participants in WGS testing, we documented the time spent by our clinical research group on various activities related to program preparation, participant screening, and consent prior to WGS. Participants were children or young adults with autism, intellectual or developmental disability, and/or congenital anomalies, who have remained undiagnosed despite previous evaluation, and their biologic parents. Results showed that significant time was spent in securing allocation of clinical research space to counsel participants and families, and in acquisition and review of participant's medical records. Pre-enrollment chart review identified two individuals with existing diagnoses resulting in savings of $30,000 for the genome sequencing alone, as well as saving hours of personnel time for genome interpretation and communication of WGS results. New WGS programs should plan for costs associated with additional pre-test administrative planning and patient evaluation time that will be required to provide high quality care.
Measuring infrastructure: A key step in program evaluation and planning
Schmitt, Carol L.; Glasgow, LaShawn; Lavinghouze, S. Rene; Rieker, Patricia P.; Fulmer, Erika; McAleer, Kelly; Rogers, Todd
2016-01-01
State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General’s call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model’s utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. PMID:27037655
Measuring infrastructure: A key step in program evaluation and planning.
Schmitt, Carol L; Glasgow, LaShawn; Lavinghouze, S Rene; Rieker, Patricia P; Fulmer, Erika; McAleer, Kelly; Rogers, Todd
2016-06-01
State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General's call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model's utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. Copyright © 2016 Elsevier Ltd. All rights reserved.
Oregon Green Light CVO evaluation : final report : executive summary
DOT National Transportation Integrated Search
2001-04-01
This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...
SMART operational field test evaluation : dispatchers survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...
Test Plan - Solids Accumulation Scouting Studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duignan, M. R.; Steeper, T. J.; Steimke, J. L.
This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilizationmore » Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.« less
Testing, Requirements, and Metrics
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hyatt, Larry; Hammer, Theodore F.; Huffman, Lenore; Wilson, William
1998-01-01
The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.
Planning Educational Programs: An Evaluation Report for the Occupational Exploration Program.
ERIC Educational Resources Information Center
Altschuld, James W.; Pritz, Sandra
The evaluation report is one of seven produced for the Occupational Exploration Program (OEP), a series of simulated occupational experiences designed for junior high school students. Describing the pilot testing of the simulation dealing with education, the report contains sections describing the simulation context, evaluation procedures,…
A study on the utilization of advanced composites in commercial aircraft wing structure
NASA Technical Reports Server (NTRS)
Watts, D. J.
1978-01-01
A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.
76 FR 52581 - Automated Data Processing and Information Retrieval System Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-23
..., however, conduct pre and/or post implementation reviews. These reviews would be intended to: Evaluate... payment accuracy. This proposed rule would also specify the requirements for submission of a test plan... eligibility systems are adequately reviewed and tested. The law requires accountability for ensuring test...
Doig, Emmah; Prescott, Sarah; Fleming, Jennifer; Cornwell, Petrea; Kuipers, Pim
2016-01-01
To examine the internal reliability and test-retest reliability of the Client-Centeredness of Goal Setting (C-COGS) scale. The C-COGS scale was administered to 42 participants with acquired brain injury after completion of multidisciplinary goal planning. Internal reliability of scale items was examined using item-partial total correlations and Cronbach's α coefficient. The scale was readministered within a 1-mo period to a subsample of 12 participants to examine test-retest reliability by calculating exact and close percentage agreement for each item. After examination of item-partial total correlations, test items were revised. The revised items demonstrated stronger internal consistency than the original items. Preliminary evaluation of test-retest reliability was fair, with an average exact percent agreement across all test items of 67%. Findings support the preliminary reliability of the C-COGS scale as a tool to evaluate and promote client-centered goal planning in brain injury rehabilitation. Copyright © 2016 by the American Occupational Therapy Association, Inc.
NASA Astrophysics Data System (ADS)
Chiabrando, F.; Lingua, A.; Maschio, P.; Teppati Losè, L.
2017-02-01
The purpose of this paper is to discuss how much the phases of flight planning and the setting of the camera orientation can affect a UAVs photogrammetric survey. The test site chosen for these evaluations was the Rocca of San Silvestro, a medieval monumental castle near Livorno, Tuscany (Italy). During the fieldwork, different sets of data have been acquired using different parameters for the camera orientation and for the set up of flight plans. Acquisition with both nadiral and oblique orientation of the camera have been performed, as well as flights with different direction of the flight lines (related with the shape of the object of the survey). The different datasets were then processed in several blocks using Pix4D software and the results of the processing were analysed and compared. Our aim was to evaluate how much the parameters described above can affect the generation of the final products of the survey, in particular the product chosen for this evaluation was the point cloud.
Grundman, Michael; Pontecorvo, Michael J; Salloway, Stephen P; Doraiswamy, P Murali; Fleisher, Adam S; Sadowsky, Carl H; Nair, Anil K; Siderowf, Andrew; Lu, Ming; Arora, Anupa K; Agbulos, Abigail; Flitter, Matthew L; Krautkramer, Michael J; Sarsour, Khaled; Skovronsky, Daniel M; Mintun, Mark A
2013-01-01
Florbetapir F18 has been approved by the Food and Drug Administration for in vivo assessment of amyloid pathology in patients undergoing evaluation for Alzheimer disease (AD). The aim of this study was to determine the impact of amyloid imaging on the diagnoses and management of patients undergoing evaluation for cognitive decline. Patients were recruited to participate at 19 clinical sites. The site physician provided a provisional diagnosis, an estimate of their diagnostic confidence, and their plan for diagnostic evaluation and management both before and after receiving the results from amyloid imaging with florbetapir F18. Analyses compared the frequency of AD and non-AD diagnoses, plans for ancillary testing, and intended patient management before and after florbetapir imaging. A total of 229 patients participated in the trial (113 amyloid positive, 116 amyloid negative). After receiving the results of the florbetapir scan, diagnosis changed in 125/229, or 54.6% [95% confidence intervals (CI), 48.1%-60.9%], of cases, and diagnostic confidence increased by an average of 21.6% (95% CI, 18.3%-24.8%). A total of 199/229 or 86.9% (95% CI, 81.9%-90.7%) of cases had at least 1 change in their management plan. Intended cholinesterase inhibitor or memantine treatment increased by 17.7% (95% CI, 11.8%-25.8%) of all cases with positive scans and decreased by 23.3% (95% CI, 16.5%-31.8%) of all those with negative scans. Among subjects who had not yet undergone a completed work up, planned brain structural imaging (computed tomographic/magnetic resonance imaging) decreased by 24.4% (95% CI, 17.5%-32.8%) and planned neuropsychological testing decreased by 32.8% (95% CI, 25.0%-41.6%). In summary, amyloid imaging results altered physician's diagnostic thinking, intended testing, and management of patients undergoing evaluation for cognitive decline.
Fuel efficient traffic signal operation and evaluation: Garden Grove Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-02-01
The procedures and results of a case study of fuel efficient traffic signal operation and evaluation in the City of Garden Grove, California are documented. Improved traffic signal timing was developed for a 70-intersection test network in Garden Grove using an optimization tool called the TRANSYT Version 8 computer program. Full-scale field testing of five alternative timing plans was conducted using two instrumented vehicles equipped to measure traffic performance characteristics and fuel consumption. The field tests indicated that significant improvements in traffic flow and fuel consumption result from the use of timing plans generated by the TRANSYT optimization model. Changingmore » from pre-existing to an optimized timing plan yields a networkwide 5 percent reduction in total travel time, more than 10 percent reduction in both the number of stops and stopped delay time, and 6 percent reduction in fuel consumption. Projections are made of the benefits and costs of implementing such a program at the 20,000 traffic signals in networks throughout the State of California.« less
Brown, Lynette; Green, Cherie L; Jones, Nicholas; Stewart, Jennifer J; Fraser, Stephanie; Howell, Kathy; Xu, Yuanxin; Hill, Carla G; Wiwi, Christopher A; White, Wendy I; O'Brien, Peter J; Litwin, Virginia
2015-03-01
The objective of this manuscript is to present an approach for evaluating specimen stability for flow cytometric methods used during drug development. While this approach specifically addresses stability assessment for assays to be used in clinical trials with centralized testing facilities, the concepts can be applied to any stability assessment for flow cytometric methods. The proposed approach is implemented during assay development and optimization, and includes suggestions for designing a stability assessment plan, data evaluation and acceptance criteria. Given that no single solution will be applicable in all scenarios, this manuscript offers the reader a roadmap for stability assessment and is intended to guide the investigator during both the method development phase and in the experimental design of the validation plan. Copyright © 2015 Elsevier B.V. All rights reserved.
Film-based delivery quality assurance for robotic radiosurgery: Commissioning and validation.
Blanck, Oliver; Masi, Laura; Damme, Marie-Christin; Hildebrandt, Guido; Dunst, Jürgen; Siebert, Frank-Andre; Poppinga, Daniela; Poppe, Björn
2015-07-01
Robotic radiosurgery demands comprehensive delivery quality assurance (DQA), but guidelines for commissioning of the DQA method is missing. We investigated the stability and sensitivity of our film-based DQA method with various test scenarios and routine patient plans. We also investigated the applicability of tight distance-to-agreement (DTA) Gamma-Index criteria. We used radiochromic films with multichannel film dosimetry and re-calibration and our analysis was performed in four steps: 1) Film-to-plan registration, 2) Standard Gamma-Index criteria evaluation (local-pixel-dose-difference ≤2%, distance-to-agreement ≤2 mm, pass-rate ≥90%), 3) Dose distribution shift until maximum pass-rate (Maxγ) was found (shift acceptance <1 mm), and 4) Final evaluation with tight DTA criteria (≤1 mm). Test scenarios consisted of purposefully introduced phantom misalignments, dose miscalibrations, and undelivered MU. Initial method evaluation was done on 30 clinical plans. Our method showed similar sensitivity compared to the standard End-2-End-Test and incorporated an estimate of global system offsets in the analysis. The simulated errors (phantom shifts, global robot misalignment, undelivered MU) were detected by our method while standard Gamma-Index criteria often did not reveal these deviations. Dose miscalibration was not detected by film alone, hence simultaneous ion-chamber measurement for film calibration is strongly recommended. 83% of the clinical patient plans were within our tight DTA tolerances. Our presented methods provide additional measurements and quality references for film-based DQA enabling more sensitive error detection. We provided various test scenarios for commissioning of robotic radiosurgery DQA and demonstrated the necessity to use tight DTA criteria. Copyright © 2015 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.
ERIC Educational Resources Information Center
Roney, M. W.
The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…
ERIC Educational Resources Information Center
Cathcart, Margaret E.
1997-01-01
Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…
Strategic planning processes and hospital financial performance.
Kaissi, Amer A; Begun, James W
2008-01-01
Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.
WSTIAC: Weapon Systems Technology Information Analysis Center. Volume 6, Number 1
2005-01-01
official documentation. 2 WS"IAE Newslelter Winter 2005 Lobster Robo [s (Continued from page 1) When compared to terrestrial arthropods, underwater...were partially offset by a net during the S&T phase, could help ease the transition to the decrease of planned quantities to be purchased (-$24.4...environment to archive the ly always involves the use of a Test and Evaluation Master development of an entire system, on paper qnd/or elec- Plan (TEMP). Test
Twin Cities ramp meter evaluation : evaluation plan
DOT National Transportation Integrated Search
2000-09-25
The Minnesota Department of Transportation (Mn/DOT) uses ramp meters to manage freeway access on approximately 210 miles of freeways in the Twin Cities metropolitan area. Mn/DOT first tested ramp meters in 1969 as a method to optimize freeway safety ...
Acadia National Park ITS field operational test : evaluation strategic plan
DOT National Transportation Integrated Search
2000-07-01
This document provides a strategy for evaluating technologies known as Intelligent Transportation Systems (ITS) that will be implemented in Acadia National Park and Mount Desert Island, Maine. Acadia National Park was selected as a site for an ITS Fi...
75 FR 42760 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... accounting reports and invoices, and monitoring all spending. The Team develops, defends and executes the... results; performance measurement; research and evaluation methodologies; demonstration testing and model... ACF programs; strategic planning; performance measurement; program and policy evaluation; research and...
Evaluation of Phase II of the SmarTraveler advanced traveler information system : operational test
DOT National Transportation Integrated Search
1994-07-31
Under contract to the Massachusetts Highway Department, the Central Transportation : Planning Staff (technical staff to the Boston MPO) chose Multisystems, Inc. of : Cambridge, Massachusetts, to perform an evaluation of Phase II of the SmarTraveler :...
Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnette, Daniel Wayne
This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some ofmore » the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.« less
Shuttle environmental and thermal control/life support system computer program, supplement 1
NASA Technical Reports Server (NTRS)
Ayotte, W. J.
1975-01-01
The computer programs developed to simulate the RSECS (Representative Shuttle Environmental Control System) were described. These programs were prepared to provide pretest predictions, post-test analysis and real time problem analysis for RSECS test planning and evaluation.
The Environmental Technology Verification (ETV) – Environmental and Sustainable Technology Evaluations (ESTE) Program conducts third-party verification testing of commercially available technologies that may accomplish environmental program management goals. In this verification...
Evaluation plan : the Branson Travel and Recreational Information Program field operational test
DOT National Transportation Integrated Search
1998-02-25
The Branson Travel and Recreational Information Program (TRIP) is a Field Operational Test (FOT) of Traveler Information Services in Tourism Areas funded through the National Advanced Rural Transportation Systems Program. Over the past ten years, Bra...
SMART operational field test evaluation : scheduler survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...
12 CFR 228.28 - Assigned ratings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... bank's performance under the lending, investment and service tests, the community development test, the small bank performance standards, or an approved strategic plan, as applicable. (b) Lending, investment... credit practices. (1) The Board's evaluation of a bank's CRA performance is adversely affected by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less
2005-01-01
information for planning and management. MG-109-AF, Test and Evaluation Trends and Costs for Aircraft and Guided Weapons, Bernard Fox, Michael Boito...Experience fom Prince Sultan Air Base and Eskan Village in Saudi Arabia, Laura Werber Castaneda, Lawrence M. Hanser, and Constance H. Davis 28 RAND...India, C. Christine Fair ANNUAL REPORT 2004 47 Publications MG-109-AF, Test and Evaluation Trends and Costs for Aircraft and Guided Weapons, Bernard Fox
Evaluation of Blended Wing-Body Combinations with Curved Plan Forms at Mach Numbers Up to 3.50
NASA Technical Reports Server (NTRS)
Holdaway, George H.; Mellenthin, Jack A.
1960-01-01
This investigation is a continuation of the experimental and theoretical evaluation of the effects of wing plan-form variations on the aerodynamic performance characteristics of blended wing-body combinations. The present report compares previously tested straight-edged delta and arrow models which have leading-edge sweeps of 59.04 and 70-82 deg., respectively, with related models which have plan forms with curved leading and trailing edges designed to result in the same average sweeps in each case. All the models were symmetrical, without camber, and were generally similar having the same span, length, and aspect ratios. The wing sections had an average value of maximum thickness ratio of about 4 percent of the local wing chords in a streamwise direction. The wing sections were computed by varying their shapes along with the body radii (blending process) to match the selected area distribution and the given plan form. The models were tested with transition fixed at Reynolds numbers of roughly 4,000,000 to 9,000,000, based on the mean aerodynamic chord of the wing. The characteristic effect of the wing curvature of the delta and arrow models was an increase at subsonic and transonic speeds in the lift-curve slopes which was partially reflected in increased maximum lift-drag ratios. Curved edges were not evaluated on a diamond plan form because a preliminary investigation indicated that the curvature considered would increase the supersonic zero-lift wave drag. However, after the test program was completed, a suitable modification for the diamond plan form was discovered. The analysis presented in the appendix indicates that large reductions in the zero-lift wave drag would be obtained at supersonic Mach numbers if the leading- and trailing-edge sweeps are made to differ by indenting the trailing edge and extending the root of the leading edge.
An impact evaluation of Plan Indonesia's early childhood program.
Aboud, Frances E; Proulx, Kerrie; Asrilla, Zaitu
2016-12-27
High-quality preschools are known to prepare children for success in primary school. Over half of Indonesia's children now pass through preschools whose quality and effectiveness are unknown. Our goal was to evaluate two government preschool models, namely kindergarten (TK) and the less formal health-post (PAUD), with and without capacity-building efforts of a non-governmental organization (NGO-Plan), on children's language and math skills. Thirteen TK and 17 PAUD Plan-supported and the same number of government-supported preschools were randomly selected from East Nusa Tenggara, Indonesia. Five children from each (n = 292) and five who had graduated from each and were now in first grade (n = 241) were randomly selected and tested on language and math measures. The Plan-supported preschools were assessed for quality. Mothers reported on their family's socio-demographic situation and their child's preventive health practices, illnesses and diet over the previous two weeks. Analyses of covariance adjusting for clusters indicated that children attending Plan-supported preschools performed better overall, and especially those in TK preschools. Plan-supported TKs were observed to have higher quality than Plan-supported PAUDs. First graders who graduated from Plan-supported preschools, both TK and PAUD, achieved higher scores on language and math tests than government-supported graduates. Preventive health practices were better in the Plan group, though diet and height-for-age were poor overall. Upgrades to the government preschool program are needed to raise its quality and effectiveness, specifically by introducing a mix of instructional and indoor free-choice play, resources and teacher training to support children's learning.
NASA Astrophysics Data System (ADS)
Aubrecht, Gordon J.; Aubrecht, Judith D.
1983-07-01
True-false or multiple-choice tests can be useful instruments for evaluating student progress. We examine strategies for planning objective tests which serve to test the material covered in science (physics) courses. We also examine strategies for writing questions for tests within a test blueprint. The statistical basis for judging the quality of test items are discussed. Reliability, difficulty, and discrimination indices are defined and examples presented. Our recommendation are rather easily put into practice.
Atlanta congestion reduction demonstration. National evaluation : cost benefit analysis test plan.
DOT National Transportation Integrated Search
2001-01-01
Initiatives to evaluate the impact of Advanced Traveler Information Services (ATIS) over the last ten years have returned what appears to be contradictory results with respect to the time savings of ATIS users: large perceived time savings reported b...
Experimental Design for Evaluating the Safety Benefits of Railroad Advance Warning Signs
DOT National Transportation Integrated Search
1979-04-01
The report presents the findings and conclusions of a study to develop an experimental design and analysis plan for field testing and evaluation of the accident reduction potential of a proposed new railroad grade crossing advance warning sign. Sever...
DOT National Transportation Integrated Search
1998-07-01
This evaluation addresses technical challenges of developing advanced traveler information systems (ATIS) in rural environments, institutional benefits and issues, usefulness of the information to the traveling public, effectiveness of various media ...
Detailed test plans : Evaluation of Utah Transit Authority Connection Protection system
DOT National Transportation Integrated Search
2003-10-31
The purpose of this evaluation is to assess the effectiveness of the Connection Protection (CP) system implemented by the Utah Transit Authority (UTA). The objective of the CP system is to improve the reliability of transfers from the higher frequenc...
WSDOT intermodal data linkages : ITS field operational test evaluation plan
DOT National Transportation Integrated Search
2001-03-28
In mid-1999, the U.S. Department of Transportation (USDOT) awarded funding for an Intermodal ITS Field Operational Test (FOT) to a regional consortium led by the Washington State DOT (WSDOT). The primary focus of this WSDOT Intermodal FOT is to...
Evaluation plan : the I-40 Traveler and Tourist Information System field operational test
DOT National Transportation Integrated Search
1998-02-25
The I-40 Traveler and Tourist Information System (TTIS) in northern Arizona is a Field Operational Test (FOT) of Traveler Information Services in Tourism Areas funded through the National Advanced Rural Transportation Systems Program. The segment of ...
DOT National Transportation Integrated Search
1996-04-01
Ada County was chosen to be a part of the national Operational Test for Intelligent : Transportation Systems (ITS). ITS applies new technologies and concepts to improve : transportation systems, efficiency, mobility, energy and environmental impacts,...
DOT National Transportation Integrated Search
1996-04-01
Ada County was chosen to be a part of the national Operational Test for Intelligent : Transportation Systems (ITS). ITS applies new technologies and concepts to improve : transportation systems, efficiency, mobility, energy and environmental impacts,...
12 CFR 25.28 - Assigned ratings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... on the bank's performance under the lending, investment and service tests, the community development test, the small bank performance standards, or an approved strategic plan, as applicable. (b) Lending... credit practices. (1) The OCC's evaluation of a bank's CRA performance is adversely affected by evidence...
40 CFR 63.7342 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... malfunction. (3) Records of performance tests, performance evaluations, and opacity observations as required...) Monitoring data for COMS during a performance evaluation as required in § 63.6(h)(7)(i) and (ii). (3) Previous (that is, superceded) versions of the performance evaluation plan as required in § 63.8(d)(3). (4...
Incorporating Library Instruction in a General Education Program for College Freshmen.
ERIC Educational Resources Information Center
Fenske, Rachel F.; Clark, Susan E.
1995-01-01
Discusses steps taken in planning, implementing, evaluating, and revising library instruction in a general education course for freshmen at the University of the Pacific, and examines results of student library skill tests taken before and after having library instruction. Figures offer example test questions and tables display test averages and…
NASA Technical Reports Server (NTRS)
Raje, S.; Mcknight, J.; Willoughby, G.; Economy, R. (Principal Investigator)
1974-01-01
The author has identified the following significant results. The County of Los Angeles photointerpreted ERTS film products to define problems of interest, coordinated ground truth over the complex test site including interfaces with secondary users as well as participated in on-line analyses of the GE multispectral information extraction systems. Interactive machine analyses were carried out, developing techniques and procedures as well as evaluating the outputs for community and regional planning. Extensive aircraft underflight coverage was provided that was valuable both in inputs preparation and outputs evaluation of the machine-aided analyses. One of the nonstandard ERTS images led to the discovery of a major new fault lineament on the northern slope of the Santa Monica Mountains.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liljedahl, D.R.; Terry, J.
1977-01-01
Emission and fuel economy tests were performed on a sample of one hundred individually-owned 1975 and 1976 model-year light-duty vehicles in the Chicago metropolitan area. Vehicles manufactured by Chrysler Corporation, Ford Motor Company and General Motors Corporation were represented somewhat equally. The purpose of these tests was to investigate emission and fuel economy performance of typical in-use passenger cars and to quantify the individual and combined effects of any observable defects, disablement and/or maladjustments on exhaust emissions and fuel economy. The investigation followed a test plan which consisted of two portions. All vehicles entered the first or Restorative Maintenance Evaluationmore » portion. Certain vehicles that received a major tune-up and passed Federal Exhaust Emission Standards upon completion of the first portion proceeded into the second of Selective Malperformance Evaluation portion. The first test in the plan was conducted with the vehicle in its as received condition. Up to three additional tests were conducted in the first portion each of which was preceded by a restorative maintenance action. Vehicles that proceeded into the second portion were tested five or more times. Each of these tests was preceded by a selected maladjustment. Each test point consisted of the 1975 Federal Test Procedure Economy Test and five short cycle tests. A modest driveability evaluation was also included. (Portions of this document are not fully legible)« less
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Jamema, S V; Upreti, R R; Sharma, S; Deshpande, D D
2008-09-01
The purpose of this work is to report the results of commissioning and to establish a quality assurance (QA) program for commercial 3D treatment planning system (TPS) based on IAEA Technical Report Series 430. Eclipse v 7.3.10, (Varian Medical Systems, Palo Alto, CA, U.S.A.) TPS was commissioned for a Clinac 6EX (Varian Medical Systems, Palo Alto, CA, USA) linear accelerator. CT images of a phantom with various known in-homogeneities were acquired. The images were transferred to TPS and tested for various parameters related to patient data acquisition, anatomical modeling, plan evaluation and dose calculation. Dosimetric parameters including open, asymmetric and wedged shaped fields, oblique incidence, buildup region behavior and SSD dependence were evaluated. Representative clinical cases were tested for MU calculation and point doses. The maximum variation between the measured and the known CT numbers was 20 +/- 11.7 HU (1 SD). The results of all non-dosimetric tests were found within tolerance, however expansion at the sharp corners was found distorted. The accuracy of the DVH calculations depends on the grid size. TPS calculations of all the dosimetric parameters were in good agreement with the measured values, however for asymmetric open and wedged fields, few points were found out of tolerance. Smaller grid size calculation showed better agreement of dose calculation in the build-up region. Independent tests for MU calculation showed a variation within +/-2% (relative to planning system), meanwhile variation of 3.0% was observed when the central axis was blocked. The test results were in agreement with the tolerance specified by IAEA TRS 430. A subset of the commissioning tests has been identified as a baseline data for an ongoing QA program.
Use of the recreation opportunity spectrum in natural protected area planning and management
Gustavo Perez-Verdin; Martha E. Lee; Deborah J. Chavez
2008-01-01
The use of the Recreation Opportunity Spectrum (ROS) framework, widely used in planning and managing wildland recreation in the United States, was tested for managing recreation opportunities in southern Durango, Mexico. Two natural protected areas were used as case studies to evaluate the ROS criteria and standards for land classification of outdoor recreation...
Planning Intervention Using Dynamic Assessments: A Case Study
ERIC Educational Resources Information Center
Hasson, Natalie; Dodd, Barbara
2014-01-01
Dynamic assessments (DA) of language have been shown to be a useful addition to the battery of tests used to diagnose language impairments in children, and to evaluate their skills. The current article explores the value of the information gained from a DA in planning intervention for a child with language impairment. A single case study was used…
Research in Satellite-Fiber Network Interoperability
NASA Technical Reports Server (NTRS)
Edelson, Burt
1997-01-01
This four part report evaluated the performance of high data rate transmission links using the ACTS satellite, and to provide a preparatory test framework for two of the space science applications that have been approved for tests and demonstrations as part of the overall ACTS program. The test plan will provide guidance and information necessary to find the optimal values of the transmission parameters and then apply these parameters to specific applications. The first part will focus on the satellite-to-earth link. The second part is a set of tests to study the performance of ATM on the ACTS channel. The third and fourth parts of the test plan will cover the space science applications, Global Climate Modeling and Keck Telescope Acquisition Modeling and Control.
Servicers system demonstration plan and capability development
NASA Technical Reports Server (NTRS)
Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.
1985-01-01
A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.
Regenerative Life Support Evaluation
NASA Technical Reports Server (NTRS)
Kleiner, G. N.; Thompson, C. D.
1977-01-01
This paper describes the development plan and design concept of the Regenerative Life Support Evaluation (RLSE) planned for flight testing in the European Space Agency Spacelab. The development plan encompasses the ongoing advanced life support subsystem and a systems integration effort to evolve concurrently subsystem concepts that perform their function and can be integrated with other subsystems in a flight demonstration of a regenerative life support system. The design concept for RLSE comprises water-electrolysis O2 generation, electrochemically depolarized CO2 removal, and Sabatier CO2 reduction for atmosphere regeneration, urine vapor-compression distillation, and wash-water hyperfiltration for waste-water recovery. The flight demonstration by RLSE is an important step in qualifying the regenerative concepts for life support in space stations.
NASA Astrophysics Data System (ADS)
Tyagi, Neelam; Fontenla, Sandra; Zhang, Jing; Cloutier, Michelle; Kadbi, Mo; Mechalakos, Jim; Zelefsky, Michael; Deasy, Joe; Hunt, Margie
2017-04-01
To evaluate a commercial synthetic CT (syn-CT) software for use in prostate radiotherapy. Twenty-five prostate patients underwent CT and MR simulation scans in treatment position on a 3T MR scanner. A commercially available MR protocol was used that included a T2w turbo spin-echo sequence for soft-tissue contrast and a dual echo 3D mDIXON fast field echo (FFE) sequence for generating syn-CT. A dual-echo 3D FFE B 0 map was used for patient-induced susceptibility distortion analysis and a new 3D balanced-FFE sequence was evaluated for identification of implanted gold fiducial markers and subsequent image-guidance during radiotherapy delivery. Tissues were classified as air, adipose, water, trabecular/spongy bone and compact/cortical bone and assigned bulk HU values. The accuracy of syn-CT for treatment planning was analyzed by transferring the structures and plan from planning CT to syn-CT and recalculating the dose. Accuracy of localization at the treatment machine was evaluated by comparing registration of kV radiographs to either digitally reconstructed radiographs (DRRs) generated from syn-CT or traditional DRRs generated from the planning CT. Similarly, accuracy of setup using CBCT and syn-CT was compared to that using the planning CT. Finally, a MR-only simulation workflow was established and end-to-end testing was completed on five patients undergoing MR-only simulation. Dosimetric comparison between the original CT and syn-CT plans was within 0.5% on average for all structures. The de-novo optimized plans on the syn-CT met institutional clinical objectives for target and normal structures. Patient-induced susceptibility distortion based on B 0 maps was within 1 mm and 0.5 mm in the body and prostate respectively. DRR and CBCT localization based on MR-localized fiducials showed a standard deviation of <1 mm. End-to-end testing and MR simulation workflow was successfully validated. MRI derived synthetic CT can be successfully used for a MR-only planning and treatment for prostate radiotherapy.
Sheffrin, Meera; Stijacic Cenzer, Irena; Steinman, Michael A
2016-12-13
It is unknown whether older adults in the United States would be willing to take a test predictive of future Alzheimer's disease, or whether testing would change behavior. Using a nationally representative sample, we explored who would take a free and definitive test predictive of Alzheimer's disease, and examined how using such a test may impact advance care planning. A cross-sectional study within the 2012 Health and Retirement Study of adults aged 65 years or older asked questions about a test predictive of Alzheimer's disease (N = 874). Subjects were asked whether they would want to take a hypothetical free and definitive test predictive of future Alzheimer's disease. Then, imagining they knew they would develop Alzheimer's disease, subjects rated the chance of completing advance care planning activities from 0 to 100. We classified a score > 50 as being likely to complete that activity. We evaluated characteristics associated with willingness to take a test for Alzheimer's disease, and how such a test would impact completing an advance directive and discussing health plans with loved ones. Overall, 75% (N = 648) of the sample would take a free and definitive test predictive of Alzheimer's disease. Older adults willing to take the test had similar race and educational levels to those who would not, but were more likely to be ≤75 years old (odds ratio 0.71 (95% CI 0.53-0.94)). Imagining they knew they would develop Alzheimer's, 81% would be likely to complete an advance directive, although only 15% had done so already. In this nationally representative sample, 75% of older adults would take a free and definitive test predictive of Alzheimer's disease. Many participants expressed intent to increase activities of advance care planning with this knowledge. This confirms high public interest in predictive testing for Alzheimer's disease and suggests this may be an opportunity to engage patients in advance care planning discussions.
The helical screw expander evaluation project. [for geothermal wells
NASA Technical Reports Server (NTRS)
Mckay, R. A.
1977-01-01
A positive-displacement helical-screw expander of the Lysholm type has been adapted for geothermal service and successfully demonstrated in a 50 kW prototype power system. Evaluation of the expander by tests of a new model in a 1 MW power system under wellhead conditions in selected liquid-dominated geothermal fields is proposed. The objectives are to determine the performance characteristics of the expander and power system over a broad range of operating conditions and also to examine the concept of wellhead power plants. Throttling and fractionation of the fluids from the test wells is planned to simulate a wide range of wellhead pressures and steam fractions. Variation in the expander exhaust pressure is also planned. The investigation will include expander efficiency, corrosion, erosion, scale formation and control, and endurance testing. Interaction studies with the wells and an electric grid are also proposed.
Evaluation plan for space station network interface units
NASA Technical Reports Server (NTRS)
Weaver, Alfred C.
1990-01-01
Outlined here is a procedure for evaluating network interface units (NIUs) produced for the Space Station program. The procedures should be equally applicable to the data management system (DMS) testbed NIUs produced by Honeywell and IBM. The evaluation procedures are divided into four areas. Performance measurement tools are hardware and software that must be developed in order to evaluate NIU performance. Performance tests are a series of tests, each of which documents some specific characteristic of NIU and/or network performance. In general, these performance tests quantify the speed, capacity, latency, and reliability of message transmission under a wide variety of conditions. Functionality tests are a series of tests and code inspections that demonstrate the functionality of the particular subset of ISO protocols which have been implemented in a given NIU. Conformance tests are a series of tests which would expose whether or not selected features within the ISO protocols are present and interoperable.
Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures
NASA Technical Reports Server (NTRS)
Martin, J. J.; Reid, R. S.
2010-01-01
Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
40 CFR 63.7952 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... performance tests and performance evaluations as required by § 63.10(b)(2)(viii). (4) The records of initial... your continuous monitoring system. (2) Performance evaluation plans, including previous (i.e... Section 63.7952 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...
DOT National Transportation Integrated Search
1997-01-01
This document reports on the formal evaluation of the targeted (limited but highly focused) deployment of the Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE), an in-vehicle advanced traveler information system designed to provide sh...
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Ivancic, William D.; Zuzek, John E.
1991-01-01
The development of new space communications technologies by NASA has included both commercial applications and space science requirements. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. Described here are the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.
Pringle, Janice L; Kearney, Shannon M; Grasso, Kim; Boyer, Annette D; Conklin, Mark H; Szymanski, Keith A
2015-01-01
To user-test and evaluate a performance information management platform that makes standardized, benchmarked medication use quality data available to both health plans and community pharmacy organizations. Multiple health/drug plans and multiple chain and independent pharmacies across the United States. During the first phase of the study, user experience was measured via user satisfaction surveys and interviews with key personnel (pharmacists, pharmacy leaders, and health plan leadership). Improvements were subsequently made to the platform based on these findings. During the second phase of the study, the platform was implemented in a greater number of pharmacies and by a greater number of payers. User experience was then reevaluated to gather information for further improvements. The surveys and interviews revealed that users found the Web-based platform easy to use and beneficial in terms of understanding and comparing performance metrics. Primary concerns included lack of access to real-time data and patient-specific data. Many users also expressed uncertainty as to how they could use the information and data provided by the platform. The study findings indicate that while information management platforms can be used effectively in both pharmacy and health plan settings, future development is needed to ensure that the provided data can be transferred to pharmacy best practices and improved quality care.
NASA Astrophysics Data System (ADS)
Chimi, Yasuhiro; Kasahara, Shigeki; Ise, Hideo; Kawaguchi, Yoshihiko; Nakano, Junichi; Nishiyama, Yutaka
The Japan Atomic Energy Agency (JAEA) has an in-pile irradiation test plan to evaluate in-situ effects of neutron/γ-ray irradiation on stress corrosion crack (SCC) growth of irradiated stainless steels using the Japan Materials Testing Reactor (JMTR). SCC growth rate and its dependence on electrochemical corrosion potential (ECP) are different between in-pile test and post irradiation examination (PIE). These differences are not fully understood because of a lack of in-pile data. This paper presents a systematic review on SCC growth data of irradiated stainless steels, an in-pile test plan for crack growth of irradiated SUS316L stainless steel under simulated BWR conditions in the JMTR, and the development of the in-pile test techniques.
Wolfers, Mireille; de Zwart, Onno; Kok, Gerjo
2012-05-01
This article describes the development of ROsafe, an intervention to promote sexually transmitted infection (STI) testing at vocational schools in the Netherlands. Using the planning model of intervention mapping (IM), an educational intervention was designed that consisted of two lessons, an Internet site, and sexual health services at the school sites. IM is a stepwise approach for theory- and evidence-based development and implementation of interventions. It includes six steps: needs assessment, specification of the objectives in matrices, selection of theoretical methods and practical strategies, program design, implementation planning, and evaluation. The processes and outcomes that are performed during Steps 1 to 4 of IM are presented, that is, literature review and qualitative and quantitative research in needs assessment, leading to the definition of the desired behavioral outcomes and objectives. The matrix of change objectives for STI-testing behavior is presented, and then the development of theory into program is described, using examples from the program. Finally, the planning for implementation and evaluation is discussed. The educational intervention used methods that were derived from the social cognitive theory, the elaboration likelihood model, the persuasive communication matrix, and theories about risk communication. Strategies included short movies, discussion, knowledge quiz, and an interactive behavioral self-test through the Internet.
Ampe, Sophie; Sevenants, Aline; Coppens, Evelien; Spruytte, Nele; Smets, Tinne; Declercq, Anja; van Audenhove, Chantal
2015-05-01
To evaluate the effects of 'we DECide', an educational intervention for nursing home staff on shared decision-making in the context of advance care planning for residents with dementia. Advance care planning (preparing care choices for when persons no longer have decision-making capacity) is of utmost importance for nursing home residents with dementia, but is mostly not realized for this group. Advance care planning consists of discussing care choices and making decisions and corresponds to shared decision-making (the involvement of persons and their families in care and treatment decisions). This quasi-experimental pre-test-post-test study is conducted in 19 nursing homes (Belgium). Participants are nursing home staff. 'We DECide' focuses on three crucial moments for discussing advance care planning: the time of admission, crisis situations and everyday conversations. The 'ACP-audit' assesses participants' views on the organization of advance care planning (organizational level), the 'OPTION scale' evaluates the degree of shared decision-making in individual conversations (clinical level) and the 'IFC-SDM Questionnaire' assesses participants' views on Importance, Frequency and Competence of realizing shared decision-making (clinical level). (Project funded: July 2010). The study hypothesis is that 'we DECide' results in a higher realization of shared decision-making in individual conversations on advance care planning. A better implementation of advance care planning will lead to a higher quality of end-of-life care and more person-centred care. We believe our study will be of interest to researchers and to professional nursing home caregivers and policy-makers. © 2014 John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, C; Yin, Y
Purpose: To compare the dosimetric difference of the target volume and organs at risk(OARs) between conventional intensity-modulated radiotherapy(C-IMRT) and knowledge-based radiation therapy (KBRT) plans for cervix cancer. Methods: 39 patients with cervical cancer after surgery were randomly selected, 20 patient plans were used to create the model, the other 19 cases used for comparative evaluation. All plans were designed in Eclipse system. The prescription dose was 30.6Gy, 17 fractions, OARs dose satisfied to the clinical requirement. A paired t test was used to evaluate the differences of dose-volume histograms (DVH). Results: Comparaed to C-IMRT plan, the KBRT plan target canmore » achieve the similar target dose coverage, D98,D95,D2,HI and CI had no difference (P≥0.05). The dose of rectum, bladder and femoral heads had no significant differences(P≥0.05). The time was used to design treatment plan was significant reduced. Conclusion: This study shows that postoperative radiotherapy of cervical KBRT plans can achieve the similar target and OARs dose, but the shorter designing time.« less
Yield Model Development (YMD) implementation plan for fiscal years 1981 and 1982
NASA Technical Reports Server (NTRS)
Ambroziak, R. A. (Principal Investigator)
1981-01-01
A plan is described for supporting USDA crop production forecasting and estimation by (1) testing, evaluating, and selecting crop yield models for application testing; (2) identifying areas of feasible research for improvement of models; and (3) conducting research to modify existing models and to develop new crop yield assessment methods. Tasks to be performed for each of these efforts are described as well as for project management and support. The responsibilities of USDA, USDC, USDI, and NASA are delineated as well as problem areas to be addressed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... Commissioner of CBP with authority to conduct limited test programs or procedures designed to evaluate planned.... Specifically, CBP is looking for test participants to include: 2-3 Ocean Carriers. At least one must be filing... their software ready to test with CBP once CBP begins the certification process. CBP will post the...
ERIC Educational Resources Information Center
Hopley, Ken; And Others
The first of several planned volumes of Free Response Test Items contains geology questions developed by the Assessment and Evaluation Unit of the New South Wales Department of Education. Two additional geology volumes and biology and chemistry volumes are in preparation. The questions in this volume were written and reviewed by practicing…
ERIC Educational Resources Information Center
Chiu, Angela Wai Mon
2010-01-01
The current study used a programmatic dissemination model as a guiding framework for testing an evidence-supported treatment (EST) for child anxiety disorders in the school setting. The main goal of the project was to conduct the first of a planned series of partial-effectiveness tests (group-design randomized controlled trials) evaluating the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, B; Lee, S; Chen, S
Purpose: Monitoring the delivered dose is an important task for the adaptive radiotherapy (ART) and for determining time to re-plan. A software tool which enables automatic delivered dose calculation using cone-beam CT (CBCT) has been developed and tested. Methods: The tool consists of four components: a CBCT Colleting Module (CCM), a Plan Registration Moduel (PRM), a Dose Calculation Module (DCM), and an Evaluation and Action Module (EAM). The CCM is triggered periodically (e.g. every 1:00 AM) to search for newly acquired CBCTs of patients of interest and then export the DICOM files of the images and related registrations defined inmore » ARIA followed by triggering the PRM. The PRM imports the DICOM images and registrations, links the CBCTs to the related treatment plan of the patient in the planning system (RayStation V4.5, RaySearch, Stockholm, Sweden). A pre-determined CT-to-density table is automatically generated for dose calculation. Current version of the DCM uses a rigid registration which regards the treatment isocenter of the CBCT to be the isocenter of the treatment plan. Then it starts the dose calculation automatically. The AEM evaluates the plan using pre-determined plan evaluation parameters: PTV dose-volume metrics and critical organ doses. The tool has been tested for 10 patients. Results: Automatic plans are generated and saved in the order of the treatment dates of the Adaptive Planning module of the RayStation planning system, without any manual intervention. Once the CTV dose deviates more than 3%, both email and page alerts are sent to the physician and the physicist of the patient so that one can look the case closely. Conclusion: The tool is capable to perform automatic dose tracking and to alert clinicians when an action is needed. It is clinically useful for off-line adaptive therapy to catch any gross error. Practical way of determining alarming level for OAR is under development.« less
Evaluating patients' comprehensibility of a standardized medication plan.
Botermann, Lea; Monzel, Katharina; Krueger, Katrin; Eickhoff, Christiane; Wachter, Angelika; Kloft, Charlotte; Laufs, Ulrich; Schulz, Martin
2016-10-01
A standardized medication plan for patients has been developed and recently enacted into German law depicting all medicines taken. It can only increase medication safety if patients use and understand it. We evaluated patients' comprehensibility of the medication plan and analyzed potential variables influencing patients' understanding. The medication plan template v2.0 was first tested in N = 40 patients, and the "Evaluation Tool to test the handling of the Medication Plan" (ET-MP) was developed, rating patients' understanding from 0 to 100 %. The cut-off, distinguishing if patients understand the medication plan, was set at 90 %. The ET-MP was then applied to an amended medication plan questioning N = 40 general internal medicine (GIM) and N = 50 patients with chronic heart failure (CHF). The mean (± standard deviation (SD)) age of the study cohort was 69 ± 13 years, 47 % female. Patients took 8 ± 3 drugs chronically. The CHF patients had a lower level of education compared to the GIM group (p = 0.004). The overall ET-MP score was 82 ± 21 % (GIM 86 ± 19 %, CHF 78 ± 23 %; p = 0.16). Forty-three percent achieved a score >90 %. A moderate correlation was found between the ET-MP score and the level of education (r = 0.45) and age (r = -0.46), respectively (both p < 0.001). Cognitively impaired CHF patients (p = 0.03) and patients with advanced CHF (p = 0.006) achieved a lower ET-MP score. In the CHF cohort, signs of depression or a lower level of self-care behaviour were not associated with a lower ET-MP score. The ET-MP is suitable to explore patients' understanding of a medication plan. Less than 50 % of the patients reached a score above 90 %. Higher age and lower level of education but not the diagnosis of CHF seem to correlate with impaired understanding of the standardized medication plan. In addition to a medication plan, a significant number of patients are in need of further and continuous care to improve medication safety.
TU-EF-304-03: 4D Monte Carlo Robustness Test for Proton Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Souris, K; Sterpin, E; Lee, J
Purpose: Breathing motion and approximate dose calculation engines may increase proton range uncertainties. We address these two issues using a comprehensive 4D robustness evaluation tool based on an efficient Monte Carlo (MC) engine, which can simulate breathing with no significant increase in computation time. Methods: To assess the robustness of the treatment plan, multiple scenarios of uncertainties are simulated, taking into account the systematic and random setup errors, range uncertainties, and organ motion. Our fast MC dose engine, called MCsquare, implements optimized models on a massively-parallel computation architecture and allows us to accurately simulate a scenario in less than onemore » minute. The deviations of the uncertainty scenarios are then reported on a DVH-band and compared to the nominal plan.The robustness evaluation tool is illustrated in a lung case by comparing three 60Gy treatment plans. First, a plan is optimized on a PTV obtained by extending the CTV with an 8mm margin, in order to take into account systematic geometrical uncertainties, like in our current practice in radiotherapy. No specific strategy is employed to correct for tumor and organ motions. The second plan involves a PTV generated from the ITV, which encompasses the tumor volume in all breathing phases. The last plan results from robust optimization performed on the ITV, with robustness parameters of 3% for tissue density and 8 mm for positioning errors. Results: The robustness test revealed that the first two plans could not properly cover the target in the presence of uncertainties. CTV-coverage (D95) in the three plans ranged respectively between 39.4–55.5Gy, 50.2–57.5Gy, and 55.1–58.6Gy. Conclusion: A realistic robustness verification tool based on a fast MC dose engine has been developed. This test is essential to assess the quality of proton therapy plan and very useful to study various planning strategies for mobile tumors. This work is partly funded by IBA (Louvain-la-Neuve, Belgium)« less
30 CFR 282.28 - Environmental protection measures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... recent research or improved monitoring techniques. (5) When prototype test mining is proposed, the lessee...) The sampling techniques and procedures to be used to acquire the needed data and information; (ii) The... evaluation of the approved Delineation, Testing, or Mining Plan. The Director's review of the air quality...
Crowe, Scott B; Kairn, Tanya; Middlebrook, Nigel; Hill, Brendan; Christie, David R H; Knight, Richard T; Kenny, John; Langton, Christian M; Trapp, Jamie V
2013-01-01
Introduction This study examines and compares the dosimetric quality of radiotherapy treatment plans for prostate carcinoma across a cohort of 163 patients treated across five centres: 83 treated with three-dimensional conformal radiotherapy (3DCRT), 33 treated with intensity modulated radiotherapy (IMRT) and 47 treated with volumetric modulated arc therapy (VMAT). Methods Treatment plan quality was evaluated in terms of target dose homogeneity and organs at risk (OAR), through the use of a set of dose metrics. These included the mean, maximum and minimum doses; the homogeneity and conformity indices for the target volumes; and a selection of dose coverage values that were relevant to each OAR. Statistical significance was evaluated using two-tailed Welch's T-tests. The Monte Carlo DICOM ToolKit software was adapted to permit the evaluation of dose metrics from DICOM data exported from a commercial radiotherapy treatment planning system. Results The 3DCRT treatment plans offered greater planning target volume dose homogeneity than the other two treatment modalities. The IMRT and VMAT plans offered greater dose reduction in the OAR: with increased compliance with recommended OAR dose constraints, compared to conventional 3DCRT treatments. When compared to each other, IMRT and VMAT did not provide significantly different treatment plan quality for like-sized tumour volumes. Conclusions This study indicates that IMRT and VMAT have provided similar dosimetric quality, which is superior to the dosimetric quality achieved with 3DCRT. PMID:26229621
1980-03-01
Oceanography Center (FNOC) is currently testing and evaluating a computerized flight plan system, referred to, for short, as OPARS. This sytem , developed to...replace the Lockheed Jetplan flight plan sytem , provides users at remote sites with direct access to the FNOC computer via 11 telephone lines. The...validity, but only for format. For example, an entry of ABCE , as the four- letter identification code for the destination airfield, would be accepted
Assessment of eustachian tube function in tympanoplasty.
Prasad, Kishore Chandra; Hegde, Mahesh Chandra; Prasad, Sampath Chandra; Meyappan, Hari
2009-06-01
A clinically useful test for eustachian tube function (ETF) is still lacking. Here we plan to evaluate the mucociliary function of the ET by saccharin and methylene blue test, and compare the outcome of surgery with normal and abnormal ET functions. Case series with planned data collection. Department of Otolaryngology-Head and Neck Surgery, Kasturba Medical College, Mangalore (Manipal University), a tertiary care center in South India. This study comprised 86 patients diagnosed with mucosal chronic otitis media in quiescent/inactive stage. All were subjected to a detailed clinical examination and investigations. Preoperative evaluation of ETF was compared with postoperative outcome of surgery, and the results were analyzed. The saccharin test and methylene blue dye test had a good correlation in evaluating ETF. The mean value for saccharin perception time and the clearance time for methylene blue were 17.5 and 8.1 minutes, respectively. ETF was best in anterior, worst among posterior, and intermediate in subtotal perforations. Type 1 tympanoplasty was successful in 94 percent with normal ETF and in 68 percent with partial dysfunction. The saccharin test is a simple, cost-effective, and valuable diagnostic tool to assess the mucociliary function of the ET. The outcome of middle ear surgery would be a success in normal ETF, whereas in partial dysfunction the outcome need not necessarily be a failure.
Electrical Subsystems Flight Test Handbook
1984-01-01
distribution of this handbook to the public at large, or by DDC to the National Technical Information Service (NTIS). At NTIS, it will be available to...Abnormal Mode 58 Emergency Mode 61 Instrumentation 62 Test Information Sheets 62 Integration with Flight Test Program 62 DATA MEASUREMENT, ANALYS IS...AND EVALUATION 65 REFERENCES 73 -APPENDIX A - EXAMPLE OF TEST INFORMATION SHEET 75 APPENDIX B - EXAMPLE OF TEST PLAN SAFETY REVIEW 85 APPENDIX C
Supplement to a Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.
ERIC Educational Resources Information Center
Findorff, Irene K.
This document summarizes the results of a project at Tulane University that was designed to adapt, test, and evaluate a computerized information and menu planning system utilizing linear programing techniques for use in school lunch food service operations. The objectives of the menu planning were to formulate menu items into a palatable,…
ERIC Educational Resources Information Center
Stodden, Robert A.; Boone, Rosalie
1986-01-01
Discusses the role of teachers in providing vocational assessment to disabled students. Steps in this process include (1) establish planning team and conduct information search, (2) define purpose, (3) establish basic considerations, (4) formulate assessment model, (5) establish implementation focus, and (6) pilot test and evaluate assessment…
Bernabé, Beatriz; González-Rivera, María Dolores; Campos-Izquierdo, Antonio
2017-01-01
The purpose of this study is to investigate the planning and the evaluation of Spanish sport and physical activity instructors as well as to analyze and compare the two variables in terms of their gender, age, level of studies and work experience. This research falls inside the quantitative type methodology of descriptive cut through standardized interview using the standardized questionnaire: "Human resources of sport and physical activity". It analyses the situation and performance of people working in functions of sport and physical activity. The questionnaire was completed by 600 sport and physical activity instructors from Spain. Key results revealed that 48.0% of them plan their classes and 58.17% assess. The study also found male university graduates between the ages of 60 and 70, with 10 years of experience or more spend the most time on planning and assessment. Daily classroom observation was the tool which physical activity and sport instructors used the most, followed by execution tests. The lesser used tools were theoretical knowledge exams, diaries and the personally created tests, across all of the variables.
Simon, Richard
2008-06-01
Developments in genomics and biotechnology provide unprecedented opportunities for the development of effective therapeutics and companion diagnostics for matching the right drug to the right patient. Effective co-development involves many new challenges with increased opportunity for success as well as delay and failure. Clinical trial designs and adaptive analysis plans for the prospective design of pivotal trials of new therapeutics and companion diagnostics are reviewed. Effective co-development requires careful prospective planning of the design and analysis strategy for pivotal clinical trials. Randomized clinical trials continue to be important for evaluating the effectiveness of new treatments, but the target populations for analysis should be prospectively specified based on the companion diagnostic. Post hoc analyses of traditionally designed randomized clinical trials are often deeply problematic. Clear separation is generally required of the data used for developing the diagnostic test, including their threshold of positivity, from the data used for evaluating treatment effectiveness in subsets determined by the test. Adaptive analysis can be used to provide flexibility to the analysis but the use of such methods requires careful planning and prospective definition in order to assure that the pivotal trial adequately limits the chance of erroneous conclusions.
2017-01-01
The purpose of this study is to investigate the planning and the evaluation of Spanish sport and physical activity instructors as well as to analyze and compare the two variables in terms of their gender, age, level of studies and work experience. This research falls inside the quantitative type methodology of descriptive cut through standardized interview using the standardized questionnaire: “Human resources of sport and physical activity”. It analyses the situation and performance of people working in functions of sport and physical activity. The questionnaire was completed by 600 sport and physical activity instructors from Spain. Key results revealed that 48.0% of them plan their classes and 58.17% assess. The study also found male university graduates between the ages of 60 and 70, with 10 years of experience or more spend the most time on planning and assessment. Daily classroom observation was the tool which physical activity and sport instructors used the most, followed by execution tests. The lesser used tools were theoretical knowledge exams, diaries and the personally created tests, across all of the variables. PMID:28683081
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thind, K; Tolakanahalli, R
2014-08-15
The aim of this study was to analyze the feasibility of designing comprehensive QA plans using iComCAT for Elekta machines equipped with Agility multileaf collimator and continuously variable dose rate. Test plans with varying MLC speed, gantry speed, and dose rate were created and delivered in a controlled manner. A strip test was designed with three 1 cm MLC positions and delivered using dynamic, StepNShoot and VMAT techniques. Plans were also designed to test error in MLC position with various gantry speeds and various MLC speeds. The delivery fluence was captured using the electronic portal-imaging device. Gantry speed was foundmore » to be within tolerance as per the Canadian standards. MLC positioning errors at higher MLC speed with gravity effects does add more than 2 mm discrepancy. More tests need to be performed to evaluate MLC performance using independent measurement systems. The treatment planning system with end-to-end testing necessary for commissioning was also investigated and found to have >95% passing rates within 3%/3mm gamma criteria. Future studies involve performing off-axis gantry starshot pattern and repeating the tests on three matched Elekta linear accelerators.« less
NASA Technical Reports Server (NTRS)
1985-01-01
Advanced testing of structural materials was developed by Lewis Research Center and Langley Research Center working with the American Society for Testing and Materials (ASTM). Under contract, Aluminum Company of America (Alcoa) conducted a study for evaluating stress corrosion cracking, and recommended the "breaking load" method which determines fracture strengths as well as measuring environmental degradation. Alcoa and Langley plan to submit the procedure to ASTM as a new testing method.
Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study
NASA Astrophysics Data System (ADS)
Saliceti, Jose A.
The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.
Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-01-12
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activitymore » Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999), and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less
Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-05-19
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy ''Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO)' (Nguyen 1999a), ''Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Butch X (LAW DQO) (Nguyen 1999b)'', ''Low Activity Wastemore » and High-Level Waste Feed Data Quality Objectives (L&H DQO)'' (Patello et al. 1999), and ''Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO)'' (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide sub-samples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less
NASA Astrophysics Data System (ADS)
Limatahu, I.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.
Advanced on-site power plant development technology program
NASA Technical Reports Server (NTRS)
Kemp, F. S.
1985-01-01
A 30-cell stack was tested for 7200 hours. At 6000 hours the stack was successfully refilled with acid with no loss of performance. A second stack containing the advanced Configuration B cell package was fabricated and assembled for testing in 1985. A 200-kW brassboard inverter was successfully evaluated, verifying the design of the two-bridge ASCR circuit design. A fuel processing catalyst train was tested for 2000 hours verifying the catalyst for use in a 200-kW development reformer. The development reformer was fabricated for evaluation in 1985. The initial test plan was prepared for a 200-kW verification test article.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... solar, wind and geothermal testing and development in a renewable energy evaluation area located near... pending geothermal lease application within the renewable energy evaluation area. This CDCA Draft Plan... Availability of the Draft Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...
DOT National Transportation Integrated Search
2002-05-30
The ultimate goal of this evaluation is to identify any benefits in operational efficiency, air quality, and customer satisfaction with the implementation of the FIRST information technology system for the intermodal freight industry at the Port of N...
DOT National Transportation Integrated Search
2002-03-29
In 1998, the United States experienced nearly 400,000 crashes involving large trucks, resulting in approximately 5,000 deaths. Although new research (e.g., the Large Truck Crash Causation Project) is being planned by the Federal Motor Carrier Safety ...
Evaluation of pressurized water cleaning systems for hardware refurbishment
NASA Technical Reports Server (NTRS)
Dillard, Terry W.; Deweese, Charles D.; Hoppe, David T.; Vickers, John H.; Swenson, Gary J.; Hutchens, Dale E.
1995-01-01
Historically, refurbishment processes for RSRM motor cases and components have employed environmentally harmful materials. Specifically, vapor degreasing processes consume and emit large amounts of ozone depleting compounds. This program evaluates the use of pressurized water cleaning systems as a replacement for the vapor degreasing process. Tests have been conducted to determine if high pressure water washing, without any form of additive cleaner, is a viable candidate for replacing vapor degreasing processes. This paper discusses the findings thus far of Engineering Test Plan - 1168 (ETP-1168), 'Evaluation of Pressurized Water Cleaning Systems for Hardware Refurbishment.'
DOT National Transportation Integrated Search
1997-09-20
The Eight Coast Guard District has an extremely large AOR : encompassing 26 States. The District is responsible for 1,200 miles : of coast line and 10,300 miles of inland waterways. The major : missions are Law Enforcement, Search and Rescue, and Pol...
2008-09-01
inputs to interface and workspace design , and iterative user testing is not required. However, an effective HSI Program is just as important on a COTS...this phase is the contract, and the various design reviews, tests , and evaluations that occur to ensure that the system meets it goals. 3.3 DBCM ESM...Report(s). • HSI Approvals of Relevant Design Changes. • HSI Test Plans and Reports. • HSI Review Progress and Evaluation Memos and Reports. • HSI
Aircraft radial-belted tire evaluation
NASA Technical Reports Server (NTRS)
Yager, Thomas J.; Stubbs, Sandy M.; Davis, Pamela A.
1990-01-01
An overview is given of the ongoing joint NASA/FAA/Industry Surface Traction And Radial Tire (START) Program being conducted at NASA Langley's Aircraft Landing Dynamics Facility (ALDF). The START Program involves tests using three different tire sizes to evaluate tire rolling resistance, braking, and cornering performance throughout the aircraft ground operational speed range for both dry and wet runway surfaces. Preliminary results from recent 40 x 14 size bias-ply, radial-belted, and H-type aircraft tire tests are discussed. The paper concludes with a summary of the current program status and planned ALDF test schedule.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, H; Liang, X; Kalbasi, A
2014-06-01
Purpose: Advanced radiotherapy (RT) techniques such as proton pencil beam scanning (PBS) and photon-based volumetric modulated arc therapy (VMAT) have dosimetric advantages in the treatment of head and neck malignancies. However, anatomic or alignment changes during treatment may limit robustness of PBS and VMAT plans. We assess the feasibility of automated deformable registration tools for robustness evaluation in adaptive PBS and VMAT RT of oropharyngeal cancer (OPC). Methods: We treated 10 patients with bilateral OPC with advanced RT techniques and obtained verification CT scans with physician-reviewed target and OAR contours. We generated 3 advanced RT plans for each patient: protonmore » PBS plan using 2 posterior oblique fields (2F), proton PBS plan using an additional third low-anterior field (3F), and a photon VMAT plan using 2 arcs (Arc). For each of the planning techniques, we forward calculated initial (Ini) plans on the verification scans to create verification (V) plans. We extracted DVH indicators based on physician-generated contours for 2 target and 14 OAR structures to investigate the feasibility of two automated tools (contour propagation (CP) and dose deformation (DD)) as surrogates for routine clinical plan robustness evaluation. For each verification scan, we compared DVH indicators of V, CP and DD plans in a head-to-head fashion using Student's t-test. Results: We performed 39 verification scans; each patient underwent 3 to 6 verification scan. We found no differences in doses to target or OAR structures between V and CP, V and DD, and CP and DD plans across all patients (p > 0.05). Conclusions: Automated robustness evaluation tools, CP and DD, accurately predicted dose distributions of verification (V) plans using physician-generated contours. These tools may be further developed as a potential robustness screening tool in the workflow for adaptive treatment of OPC using advanced RT techniques, reducing the need for physician-generated contours.« less
Zakjevskii, Viatcheslav V.; Knill, Cory S.; Rakowski, Joseph. T.
2016-01-01
A comprehensive end‐to‐end test for head and neck IMRT treatments was developed using a custom phantom designed to utilize multiple dosimetry devices. Initial end‐to‐end test and custom H&N phantom were designed to yield maximum information in anatomical regions significant to H&N plans with respect to: (i) geometric accuracy, (ii) dosimetric accuracy, and (iii) treatment reproducibility. The phantom was designed in collaboration with Integrated Medical Technologies. The phantom was imaged on a CT simulator and the CT was reconstructed with 1 mm slice thickness and imported into Varian's Eclipse treatment planning system. OARs and the PTV were contoured with the aid of Smart Segmentation. A clinical template was used to create an eight‐field IMRT plan and dose was calculated with heterogeneity correction on. Plans were delivered with a TrueBeam equipped with a high definition MLC. Preliminary end‐to‐end results were measured using film, ion chambers, and optically stimulated luminescent dosimeters (OSLDs). Ion chamber dose measurements were compared to the treatment planning system. Films were analyzed with FilmQA Pro using composite gamma index. OSLDs were read with a MicroStar reader using a custom calibration curve. Final phantom design incorporated two axial and one coronal film planes with 18 OSLD locations adjacent to those planes as well as four locations for IMRT ionization chambers below inferior film plane. The end‐to‐end test was consistently reproducible, resulting in average gamma pass rate greater than 99% using 3%/3 mm analysis criteria, and average OSLD and ion chamber measurements within 1% of planned dose. After initial calibration of OSLD and film systems, the end‐to‐end test provides next‐day results, allowing for integration in routine clinical QA. Preliminary trials have demonstrated that our end‐to‐end is a reproducible QA tool that enables the ongoing evaluation of dosimetric and geometric accuracy of clinical head and neck treatments. PACS number(s): 87.55.Qr PMID:27074453
Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning
NASA Technical Reports Server (NTRS)
Simonson, G. H. (Principal Investigator)
1972-01-01
There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeong, K; Kuo, H; Ritter, J
Purpose: To evaluate the feasibility of using a metal artifact reduction technique in depleting metal artifact and its application in improving dose calculation in External Radiation Therapy Planning. Methods: CIRS electron density phantom was scanned with and without steel drill bits placed in some plug holes. Meta artifact reduction software with Metal Deletion Technique (MDT) was used to remove metal artifacts for scanned image with metal. Hounsfield units of electron density plugs from artifact free reference image and MDT processed images were compared. To test the dose calculation improvement after the MDT processed images, clinically approved head and neck planmore » with manual dental artifact correction was tested. Patient images were exported and processed with MDT and plan was recalculated with new MDT image without manual correction. Dose profiles near the metal artifacts were compared. Results: The MDT used in this study effectively reduced the metal artifact caused by beam hardening and scatter. The windmill around the metal drill was greatly improved with smooth rounded view. Difference of the mean HU in each density plug between reference and MDT images were less than 10 HU in most of the plugs. Dose difference between original plan and MDT images were minimal. Conclusion: Most metal artifact reduction methods were developed for diagnostic improvement purpose. Hence Hounsfield unit accuracy was not rigorously tested before. In our test, MDT effectively eliminated metal artifacts with good HU reproduciblity. However, it can introduce new mild artifacts so the MDT images should be checked with original images.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anast, Kurt Roy; Funk, David John; Hargis, Kenneth Marshall
The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively) at Los Alamos National Laboratory (LANL). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquidmore » fractions expected from parent waste containers, and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of adding zeolite currently planned for implementation at LANL’s Waste Characterization, Reduction, and Repackaging Facility (WCRRF). The course of this work verified the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that WypAlls, cheesecloth, and Celotex absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). Sensitivity testing and an analysis were conducted to evaluate the waste form for reactivity. Tests included subjecting surrogate material to mechanical impact, friction, electrostatic discharge and thermal insults. The testing confirmed that the waste does not exhibit the characteristic of reactivity (D003). Follow-on testing was conducted to demonstrate the effectiveness of zeolite stabilization for ignitable WypAll and cheesecloth debris and additional nitrate salt solutions (those exhibiting the oxidizer characteristic) to demonstrate the effectiveness of the remedy. Follow-on testing also included testing of surrogate materials containing Waste Lock 770, which is present in four of the RNS containers, and potential items of debris such as plywood and Celotex material. Testing to evaluate the effectiveness of the remedy was performed using the specific remediation processes that are planned for use at the WCRRF. Finally, testing was also performed to evaluate the holding capacity of zeolite using a highly acidic surrogate solution and to characterize the composition of gases generated during mixing of zeolite with surrogate solutions. All these tests demonstrated the effectiveness of adding zeolite as the planned remedy.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salinas Aranda, F; Suarez, V; Arbiser, S
2016-06-15
Purpose: To implement an end-to-end QA test of the radiation therapy imaging, planning and delivery process, aimed to assess the dosimetric agreement accuracy between planned and delivered treatment, in order to identify and correct possible sources of deviation. To establish an internal standard for machine commissioning acceptance. Methods: A test involving all steps of the radiation therapy: imaging, planning and delivery process was designed. The test includes analysis of point dose and planar dose distributions agreement between TPS calculated and measured dose. An ad hoc 16 cm diameter PMMA phantom was constructed with one central and four peripheral bores thatmore » can accommodate calibrated electron density inserts. Using Varian Eclipse 10.0 and Elekta XiO 4.50 planning systems, IMRT, RapidArc and 3DCRT with hard and dynamic wedges plans were planned on the phantom and tested. An Exradin A1SL chamber is used with a Keithley 35617EBS electrometer for point dose measurements in the phantom. 2D dose distributions were acquired using MapCheck and Varian aS1000 EPID.Gamma analysis was performed for evaluation of 2D dose distribution agreement using MapCheck software and Varian Portal Dosimetry Application.Varian high energy Clinacs Trilogy, 2100C/CD, 2000CR and low energy 6X/EX where tested.TPS-CT# vs. electron density table were checked for CT-scanners used. Results: Calculated point doses were accurate to 0.127% SD: 0.93%, 0.507% SD: 0.82%, 0.246% SD: 1.39% and 0.012% SD: 0.01% for LoX-3DCRT, HiX-3DCRT, IMRT and RapidArc plans respectively. Planar doses pass gamma 3% 3mm in all cases and 2% 2mm for VMAT plans. Conclusion: Implementation of a simple and reliable quality assurance tool was accomplished. The end-to-end proved efficient, showing excellent agreement between planned and delivered dose evidencing strong consistency of the whole process from imaging through planning to delivery. This test can be used as a first step in beam model acceptance for clinical use.« less
Evaluation Plan for the Computerized Adaptive Vocational Aptitude Battery
1982-05-15
Educational and Psychological Tests published by the American Psychological Association, the American Educational Research Association, and the National...Psychometric Society Meetings, May 1981. References 71 American Psychological Association. Standards for educational and psychological tests . Washington, D.C...Methods Program, Dept. of Psychology , Uni- versity of Minnesota, MN, September, 1981. Koch, W.R. & Reckase, M.D. A live tailored testing comparison study
2007-05-01
Bioaugmentation of Source Areas Dover National Test Site, Dover, Delaware ESTCP Project Number ER-0008 May 2007 Revision 3.0 ER0008 ii...2007.05.24 Revision 3.0 TABLE OF CONTENTS Page 1. INTRODUCTION...ER0008 iii 2007.05.24 Revision 3.0 3.5 Testing and Evaluation Plan
Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)
1994-03-25
designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test
Strategic planning for the International Space Station
NASA Technical Reports Server (NTRS)
Griner, Carolyn S.
1990-01-01
The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Ivancic, William D.; Zuzek, John E.
1991-01-01
The development of new space communications technologies by NASA has included both commercial applications and space science requirements. At NASA's Lewis Research Center, methods and facilities have been developed for evaluating these new technologies in the laboratory. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware-based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. This paper describes the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present, and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.
A novel conversion method for radiographic guide into surgical guide.
Peng, Yao-Te; Tseng, Chung-Chih; Du, Yi-Chun; Chen, Yen-Nien; Chang, Chih-Han
2017-06-01
The study proposed a novel method for converting a radiographic guide into a surgical guide and evaluated its accuracy. Radiographic guide was reformed with the addition of index rods for geometric conversion method (GCM). Planning implants were projected on geometric projection planes, and the implant positions were measured. The radiographic guide was converted into surgical guide using a generic bench drill machine with GCM data. Two experiments were designed to validate the GCM. (1) In vitro test: Twenty implants were placed on five edentulous dental models by using the GCM (group 1) and Stereolithography (SLA) method (group 2), respectively. The deviations of planned and placed implant were calculated, and the precision error (PE) value was calculated to evaluate the stability of the GCM and SLA. (2) In vivo test: Nine edentulous subjects were selected for clinical implant surgery with the GCM guide. Two level of the index rods of radiographic guides were prepared for surgical guides forming. The differences between the planned and actual implants were calculated in implant head, apex, and angulation. The in vitro test revealed no significant differences in the planned and placed angulations between groups 1 and 2 (P > .05). The PE was not significantly different between groups 1 and 2 (P > .05). The in vivo test revealed a successful treatment of the subjects, and 16 implant sites were evaluated. The results indicated that GCM guide could achieve the three-dimensional (3D) offset deviations of 1.03 ± 0.27 mm and 1.17 ± 0.24 mm at the implant head and apex, respectively, and 1.37° ± 0.21° for the 3D angulation. The novel method for converting a radiographic guide into a surgical guide appears accurate and stable compared with SLA. © 2017 Wiley Periodicals, Inc.
Network Performance Evaluation Model for assessing the impacts of high-occupancy vehicle facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janson, B.N.; Zozaya-Gorostiza, C.; Southworth, F.
1986-09-01
A model to assess the impacts of major high-occupancy vehicle (HOV) facilities on regional levels of energy consumption and vehicle air pollution emissions in urban aeas is developed and applied. This model can be used to forecast and compare the impacts of alternative HOV facility design and operation plans on traffic patterns, travel costs, model choice, travel demand, energy consumption and vehicle emissions. The model is designed to show differences in the overall impacts of alternative HOV facility types, locations and operation plans rather than to serve as a tool for detailed engineering design and traffic planning studies. The Networkmore » Performance Evaluation Model (NETPEM) combines several urban transportation planning models within a multi-modal network equilibrium framework including modules with which to define the type, location and use policy of the HOV facility to be tested, and to assess the impacts of this facility.« less
NASA Technical Reports Server (NTRS)
Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Gernhardt, Michael L.
2018-01-01
The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.
A knowledge-based approach to automated planning for hepatocellular carcinoma.
Zhang, Yujie; Li, Tingting; Xiao, Han; Ji, Weixing; Guo, Ming; Zeng, Zhaochong; Zhang, Jianying
2018-01-01
To build a knowledge-based model of liver cancer for Auto-Planning, a function in Pinnacle, which is used as an automated inverse intensity modulated radiation therapy (IMRT) planning system. Fifty Tomotherapy patients were enrolled to extract the dose-volume histograms (DVHs) information and construct the protocol for Auto-Planning model. Twenty more patients were chosen additionally to test the model. Manual planning and automatic planning were performed blindly for all twenty test patients with the same machine and treatment planning system. The dose distributions of target and organs at risks (OARs), along with the working time for planning, were evaluated. Statistically significant results showed that automated plans performed better in target conformity index (CI) while mean target dose was 0.5 Gy higher than manual plans. The differences between target homogeneity indexes (HI) of the two methods were not statistically significant. Additionally, the doses of normal liver, left kidney, and small bowel were significantly reduced with automated plan. Particularly, mean dose and V15 of normal liver were 1.4 Gy and 40.5 cc lower with automated plans respectively. Mean doses of left kidney and small bowel were reduced with automated plans by 1.2 Gy and 2.1 Gy respectively. In contrast, working time was also significantly reduced with automated planning. Auto-Planning shows availability and effectiveness in our knowledge-based model for liver cancer. © 2017 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
Code of Federal Regulations, 2012 CFR
2012-07-01
... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...
Code of Federal Regulations, 2014 CFR
2014-07-01
... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...
ERIC Educational Resources Information Center
Mattatuck Community Coll., Waterbury, CT.
This document contains a developmental curriculum plan for an articulated curriculum in automotive mechanics for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum outline, a three-part automotive technician test,…
Advanced on-the-Job Training System: Readiness Test Plan
1990-05-01
entry of completions into an airman’s ATR. To determine if a specific test objective has been met, a "measure of effectiveness" (MOE) must be de ...Evaluasto acces control Test 4 Supervisor s control Test 5 Training Manager s control Test 6 GenerateATR Test 7 Generat OPTR Test 8 Generate I TR Teot 9...Trainer, Supervisor , Evaluator, Training MMnger) into only properly authorized AOTS components. This critical function Is therefore related to each of the
Aviation Careers: The Sky's the Limit
DOT National Transportation Integrated Search
1996-07-29
AMASCOT demonstrated and evaluated the feasibility of automating the collection of mileage-by-jurisdiction data and electronic data interchange for International Fuel Tax Agreement (IFTA) and International Registration Plan (IRP) reporting. The test ...
An Overview of the NASA Aeronautics Test Program Strategic Plan
NASA Technical Reports Server (NTRS)
Marshall, Timothy J.
2010-01-01
U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
Empowerment evaluation of a Swedish gender equity plan
Gavriilidis, Georgios; Gavriilidou, Nivetha Natarajan; Pettersson, Erika; Renhammar, Eva; Balkfors, Anna; Östergren, Per-Olof
2014-01-01
Background Empowerment is essential for gender equity and health. The city of Malmö, Sweden, has formulated a development plan for gender equity integration (GEIDP). A ‘Policy Empowerment Index’ (PEI) was previously developed to assess the empowerment potential of policies. Objectives To pilot-evaluate the GEIDP’s potential for empowerment and to test the PEI for future policy evaluations. Design The GEIDP was analyzed and scored according to electronically retrieved evidence on constituent opinion, participation, capacity development, evaluation–adaptation, and impact. Results The plan’s PEI score was 64% (CI: 48–78) and was classified as ‘enabling’, ranging between ‘enabling’ and ‘supportive’. The plan’s strengths were: 1) constituent knowledge and concern; 2) peripheral implementation; 3) protection of vulnerable groups; and 4) evaluation/adaptation procedures. It scored average on: 1) policy agenda setting; 2) planning; 3) provisions for education; 4) network formation; 5) resource mobilization. The weakest point was regarding promotion of employment and entrepreneurship. Conclusions The PEI evaluation highlighted the plan’s potential of constituency empowerment and proposed how it could be augmented. PMID:24993349
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mandapaka, A; Ghebremedhin, A; Farley, D
Purpose: To develop the methodology to evaluate the clinical performance of a Phase II Proton CT scanner Methods: Range errors on the order of 3%-5% constitute a major uncertainty in current charged particle treatment planning based on Hounsfield Unit (HU)-relative stopping power (RSP) calibration curves. Within our proton CT collaboration, we previously developed and built a Phase I proton CT scanner that provided a sensitive area of 9 cm (axial) × 18 cm (in-plane). This scanner served to get initial experience with this new treatment planning tool and to incorporate lessons learned into the next generation design. A Phase IImore » scanner was recently completed and is now undergoing initial performance testing. It will increase the proton acquisition rate and provide a larger detection area of 9 cm x 36 cm. We are now designing a comprehensive evaluation program to test the image quality, imaging dose, and range uncertainty associated with this scanner. The testing will be performed along the lines of AAPM TG 66. Results: In our discussion of the evaluation protocol we identified the following priorities. The image quality of proton CT images, in particular spatial resolution and low-density contrast discrimination, will be evaluated with the Catphan600 phantom. Initial testing showed that the Catphan uniformity phantom did not provide sufficient uniformity; it was thus replaced by a cylindrical water phantom. The imaging dose will be tested with a Catphan dose module, and compared to a typical cone beam CT dose for comparable image quality. Lastly, we developed a dedicated dosimetry range phantom based on the CIRS pediatric head phantom HN715. Conclusion: A formal evaluation of proton CT as a new tool for proton treatment planning is an important task. The availability of the new Phase II proton CT scanner will allow us to perform this task. This research is supported by the National Institute of Biomedical Imaging and Bioengineering of the NIH under award number R01EB013118. The content is solely the responsibility of the authors and does not necessarily represent the official views of the NIH.« less
Can persuasive messages encourage individuals to create action plans for physical activity?
Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E
2014-08-01
Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.
Pretest Predictions for Phase II Ventilation Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yiming Sun
The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less
França, Lucia H F; Hershey, Douglas A
2018-03-01
In this investigation, we attempt to replicate the Interdisciplinary Financial Planning Model advanced by Hershey et al. (International Journal of Aging and Human Development, 70, 1-38, 2010) using a sample of Brazilian adults. This model, which was originally tested on individuals from The Netherlands and the United States, posits that psychological, social, and economic forces are key determinants of retirement planning practices and perceptions of saving adequacy. Taken together, fifteen hypotheses were subject to evaluation. Participants were 167 Brazilian working adults, 21-69 years of age, who were married or cohabitating at the time of testing. A path analysis model showed substantial support for the theoretical framework, with all variables found to contribute directly or indirectly to the prediction of financial planning and saving adequacy. Furthermore, two new paths were found to emerge in the Brazilian model that were not observed in the original investigation. This cross-national replication of the Interdisciplinary Financial Planning Model extends research on the topic to a developing country in which relatively few empirical studies of retirement planning have been carried out. Other analyses in the article focus on direct comparisons between the Brazilian model and the models developed based on American and Dutch respondents, with an eye toward better understanding how cultural forces shape the retirement planning process. The discussion focuses on how models of financial planning, such as the Hershey et al. (2010) model, can inform the development of savings-oriented education and intervention programs.
Planning an effective anti-smoking mass media campaign targeting adolescents.
Pechmann, C; Reibling, E T
2000-05-01
This article addresses the following issues: Can an anti-smoking campaign that depends largely on mass media vehicles effectively reduce adolescent tobacco use? Why is an integrated campaign recommended and what are the steps in designing such a campaign? How should the campaign be evaluated? Specific topics include recommended campaign expenditures, target audience identification, selection of persuasive message content, executional (stylistic) considerations, media buying decisions, the use of focus group research and advertising copy-testing research, and outcome evaluations. It is concluded that comprehensive strategic planning and extensive research at all phases of the campaign are essential to success.
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.
Evaluation of a Microwave Blade Tip Clearance Sensor for Propulsion Health Monitoring
NASA Technical Reports Server (NTRS)
Woike, Mark R.
2013-01-01
The NASA Glenn Research Center has investigated a microwave blade tip clearance system for the structural health monitoring of gas turbine engines. This presentation describes the sensors and the experiments that have been conducted to evaluate their performance along with future plans for their use on an engine ground test.
Biometric identification standards research
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...
Cell emulation and preliminary results.
DOT National Transportation Integrated Search
2016-07-01
This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...
Code of Federal Regulations, 2010 CFR
2010-07-01
....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...-up, shutdown, and malfunction plan (§ 63.101) State (§ 63.2) Stationary Source (§ 63.2) Surge control vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment process (§ 63...
21 CFR 866.6050 - Ovarian adnexal mass assessment score test system.
Code of Federal Regulations, 2013 CFR
2013-04-01
... surgery is planned, is malignant. The test is for adjunctive use, in the context of a negative primary clinical and radiological evaluation, to augment the identification of patients whose gynecologic surgery... § 866.1(e). (c) Black box warning. Under section 520(e) of the Federal Food, Drug, and Cosmetic Act...
78 FR 31941 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... burden 810 RISE Staff Pre-Test 157 1 .25 39 RISE Staff Post-Test 157 1 .25 39 RISE burden 78 Estimated... addition, evaluation plans were developed to support rigorous site-specific and cross-site studies to... and Lesbian Center's Recognize Intervene Support Empower (RISE) project. A third phase of the study...
Planning for the Vocational Implications of Head Trauma.
ERIC Educational Resources Information Center
Sauer, G. C., Jr.; And Others
A model using career interest test results and career specific information to formulate vocational recommendations was tested on four head trauma patients who had been involved in car or motorcycle accidents at least 2 years before. As part of a psychological evaluation, patients completed the Self Directed Search (SDS), the Adjective Checklist…
14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate
Code of Federal Regulations, 2011 CFR
2011-01-01
... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...
14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate
Code of Federal Regulations, 2013 CFR
2013-01-01
... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...
14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate
Code of Federal Regulations, 2014 CFR
2014-01-01
... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...
14 CFR Appendix A to Part 63 - Test Requirements for Flight Navigator Certificate
Code of Federal Regulations, 2012 CFR
2012-01-01
... data evaluate the accuracy of the prognostic weather map used for flight planning and apply this... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Test Requirements for Flight Navigator... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: FLIGHT CREWMEMBERS OTHER THAN PILOTS Pt. 63, App. A Appendix A...
Forecasting Techniques and Library Circulation Operations: Implications for Management.
ERIC Educational Resources Information Center
Ahiakwo, Okechukwu N.
1988-01-01
Causal regression and time series models were developed using six years of data for home borrowing, average readership, and books consulted at a university library. The models were tested for efficacy in producing short-term planning and control data. Combined models were tested in establishing evaluation measures. (10 references) (Author/MES)
Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benoit, Timothy; Hlotke, John Daniel; Yacout, Abdellatif
2017-07-05
This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generatedmore » during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.« less
Samieirad, Sahand; Aboutorabzade, Mohammad-Reza; Tohidi, Elahe; Shaban, Baratollah; Khalife, Hussein; Salami, Hamid-Reza
2017-01-01
Background The epidemiology of facial injuries varies based on lifestyle, cultural background and socioeconomic status in different countries and geographic zones. This study evaluated the epidemiology of maxillofacial fractures and treatment plans in hospitalized patients in Northeast of Iran (2015-2016). Material and Methods In this retrospective study, the medical records of 502 hospitalized patients were evaluated in the Department of Maxillofacial Surgery in Kamyab Hospital in Mashhad, Iran. The type and cause of fractures and treatment plans were recorded in a checklist. Data were analyzed with Mann–Whitney test, chi-squared test and Fisher’s exact test, using SPSS 21. Results The majority of patients were male (80.3%). Most subjects were in 20-30-year age range (43.2%). The fractures were mostly caused by accidents, particularly motorcycle accidents (MCAs), and the most common site of involvement was the body of the mandible. There was a significant association between the type of treatment and age. In fact, the age range of 16-59 years underwent open reduction internal fixation (ORIF) more than other age ranges (P=0.001). Also, there was a significant association between gender and fractures (P=0.002). Conclusions It was concluded that patient age and gender and trauma significantly affected the prevalence of maxillofacial traumas, fracture types and treatment plans. This information would be useful for making better health policy strategies. Key words:Epidemiology, treatment, facial injuries, maxillofacial fractures, trauma. PMID:28809369
Ground based simulation of life sciences Spacelab experiments
NASA Technical Reports Server (NTRS)
Rummel, J. A.; Alexander, W. C.; Bush, W. H.; Johnston, R. S.
1978-01-01
The third in a series of Spacelab Mission Development tests was a joint effort of the Ames Research and Johnson Space Centers to evaluate planned operational concepts of the Space Shuttle life sciences program. A three-man crew conducted 26 experiments and 12 operational tests, utilizing both human and animal subjects. The crew lived aboard an Orbiter/Spacelab mockup for the seven-day simulation. The Spacelab was identical in geometry to the European Space Agency design, complete with removable rack sections and stowage provisions. Communications were controlled as currently planned for operational Shuttle flights. A Science Operations Remote Center at the Ames Research Center was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, describes the facilities and test program, and outlines the results of this test.
Arnautovska, Urska; Fleig, Lena; O'Callaghan, Frances; Hamilton, Kyra
2017-02-01
To assess the effects of conscious and non-conscious processes for prediction of older adults' physical activity (PA), we tested a dual-process model that integrated motivational (behavioural intention) and volitional (action planning and coping planning) processes with non-conscious, automatic processes (habit). Participants (N = 215) comprised community-dwelling older adults (M = 73.8 years). A longitudinal design was adopted to investigate direct and indirect effects of intentions, habit strength (Time 1), and action planning and coping planning (Time 2) on PA behaviour (Time 3). Structural equation modelling was used to evaluate the model. The model provided a good fit to the data, accounting for 44% of the variance in PA behaviour at Time 3. PA was predicted by intentions, action planning, and habit strength, with action planning mediating the intention-behaviour relationship. An effect of sex was also found where males used fewer planning strategies and engaged in more PA than females. By investigating an integration of conscious and non-conscious processes, this study provides a novel understanding of older adults' PA. Interventions aiming to promote PA behaviour of older adults should target the combination of psychological processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Syh, J; Ding, X; Syh, J
2015-06-15
Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less
Remote sensing of physiographic soil units of Bennett County, South Dakota
NASA Technical Reports Server (NTRS)
Frazee, C. J.; Gropper, J. L.; Westin, F. C.
1973-01-01
A study was conducted in Bennett County, South Dakota, to establish a rangeland test site for evaluating the usefulness of ERTS data for mapping soil resources in rangeland areas. Photographic imagery obtained in October, 1970, was analyzed to determine which type of imagery is best for mapping drainage and land use patterns. Imagery of scales ranging from 1:1,000,000 to 1.20,000 was used to delineate soil-vegetative physiographic units. The photo characteristics used to define physiographic units were texture, drainage pattern, tone pattern, land use pattern and tone. These units will be used as test data for evaluating ERTS data. The physiographic units were categorized into a land classification system. The various categories which were delineated at the different scales of imagery were designed to be useful for different levels of land use planning. The land systems are adequate only for planning of large areas for general uses. The lowest category separated was the facet. The facets have a definite soil composition and represent different soil landscapes. These units are thought to be useful for providing natural resource information needed for local planning.
Psychometric Evaluation of Kingston Caregiver Stress Scale.
Sadak, Tatiana; Korpak, Anna; Wright, Jacob D; Lee, Mee Kyung; Noel, Margaret; Buckwalter, Kathleen; Borson, Soo
2017-01-01
Standardized measurement of caregiver stress is a component of Medicare's new health care benefit supporting care planning for people with dementia. In this article we identify existing measures of caregiver stress, strain and burden and propose specific criteria for choosing tools that may be suitable for wide use in primary care settings. We reviewed 22 measures and identified one, the Kingston Caregiver Stress Scale (KCSS), which met all the proposed criteria but had not been studied in a U.S. We conducted a psychometric evaluation of KCSS to determine its potential usefulness as a care planning tool with a U.S. We examined the internal consistency, test-retest reliability, component structure, and relationship to depression and anxiety in 227 dementia caregivers at two U.S. sites. The KCSS has high internal consistency and test-retest reliability, a strong factor structure, and moderate to high correlations with caregiver depression and anxiety. KCSS is a good candidate for use as part of comprehensive care planning for people with dementia and their caregivers. Routine assessment of caregiver stress in clinical care may facilitate timely intervention and potentially improve both patient and caregiver outcomes.
Fidelity of test development process within a national science grant
NASA Astrophysics Data System (ADS)
Brumfield, Teresa E.
In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had no control---and by time. The purpose for studying the case was to gain a more in-depth, holistic understanding of the real-life test development task that took place within a project evaluation context. In particular, this case study investigated how the actual test development process was affected by: (1) the national and state (i.e., NC) science standards, (2) the NSF's definition of "evidence" in a project evaluation, (3) the MSP project's understanding of the role of the to-be-developed tests in their project evaluation, (4) the MSP project's understanding of the test development process, and (5) the MSP project's participants (e.g., teacher item-writers and scientists). From an investigation of this case, it was concluded that: (a) constructing psychometrically sound tests within an evaluation is not easy, (b) sufficient time and resources to construct such measures properly are seldom provided, and (c) test construction---at least within an evaluation---is not routine and unproblematic. Based upon the results from this case study, it was recommended that stakeholders (i.e., program managers, project directors, and evaluators) be familiar with the steps and standards used to develop psychometrically sound tests. Additionally, it was recommended that, for future research, a meta-analysis that examines only the test development process be conducted of all other MSP projects. A second suggested future research area was to establish a protocol that provides a systematic means by which to examine an existing or proposed MSP project for alignment with state science standards. Such a protocol would be cost-effective in that demonstrated alignment with state science standards would enable projects to use existing state science assessments, which must be in place, according to NCLB, by the 2007-2008 school year, to demonstrate student achievement. In this way, project directors and evaluators, typically with limited familiarity with the steps and standards by which psychometrically sound assessments are created, would not be placed in the role of test developer.
ERIC Educational Resources Information Center
Aryadoust, Vahid
2015-01-01
The present study uses a mixture Rasch model to examine latent differential item functioning in English as a foreign language listening tests. Participants (n = 250) took a listening and lexico-grammatical test and completed the metacognitive awareness listening questionnaire comprising problem solving (PS), planning and evaluation (PE), mental…
2007-08-14
Boeing Phantom Works' subscale Blended Wing Body technology demonstration aircraft began its initial flight tests from NASA's Dryden Flight Research Center at Edwards Air Force Base, Calif. in the summer of 2007. The 8.5 percent dynamically scaled unmanned aircraft, designated the X-48B by the Air Force, is designed to mimic the aerodynamic characteristics of a full-scale large cargo transport aircraft with the same blended wing body shape. The initial flight tests focused on evaluation of the X-48B's low-speed flight characteristics and handling qualities. About 25 flights were planned to gather data in these low-speed flight regimes. Based on the results of the initial flight test series, a second set of flight tests was planned to test the aircraft's low-noise and handling characteristics at transonic speeds.
Hutchison, N.E.; Harbaugh, A.W.; Holloway, R.A.; Merk, C.F.
1987-01-01
The Water Resources Division (WRD) of the U.S. Geological Survey is evaluating 32-bit microcomputers to determine how they can complement, and perhaps later replace, the existing network of minicomputers. The WRD is also designing a National Water Information System (NWIS) that will combine and integrate the existing National Water Data Storage and Retrieval System (WATSTORE), National Water Data Exchange (NAWDEX), and components of several other existing systems. The procedures and testing done in a market evaluation of 32-bit microcomputers are documented. The results of the testing are documented in the NWIS Project Office. The market evaluation was done to identify commercially available hardware and software that could be used for implementing early NWIS prototypes to determine the applicability of 32-bit microcomputers for data base and general computing applications. Three microcomputers will be used for these prototype studies. The results of the prototype studies will be used to compile requirements for a Request for Procurement (RFP) for hardware and software to meet the WRD 's needs in the early 1990's. The identification of qualified vendors to provide the prototype hardware and software included reviewing industry literature, and making telephone calls and personal visits to prospective vendors. Those vendors that appeared to meet general requirements were required to run benchmark tests. (Author 's abstract)
Preliminary test results from the CELSS Test Facility Engineering Development Unit
NASA Technical Reports Server (NTRS)
Kliss, Mark H.; Macelroy, R. D.; Blackwell, C. C.; Borchers, B. A.; Drews, M. E.; Longabaugh, J. R.; Yendler, B. S.; Zografos, A. I.
1994-01-01
As part of the NASA Controlled Ecological Life Support System (CELSS) Program, a CELSS Test Facility (CTF) is being planned for installation on the Space Station. The CTF will be used to provide data on the productivity and efficiency of a variety of CELSS higher plant crops grown in the microgravity environment of the Space Station. Tight environmental control will be maintained while data on gas exchange rates and biomass accumulation rates are collected. In order to obtain an early realistic determination of the subsystem and system requirements necessary to provide the environmental conditions specified for CTF crop productivity experiments, an Engineering Development Unit (EDU) has been designed, constructed and is in the process of subsystem and system testing at NASA Ames Research Center. The EDU is a ground test-bed which will be used to characterize the integrated performance of major subsystem technologies, to evaluate hardware candidates and control strategies required for the CTF, and to further define the ability to meet CTF requirements within present Space Station constraints. This paper reviews the functional requirements for the EDU, and focuses on the performance evaluation and test results of the various subsystems. Preliminary integrated performance results and control system operation are addressed, and plans for future science and technology testing are discussed.
Test and Evaluation Plan for the Manual Domestic Passive Profiling System (MDPPS)
1994-02-01
Aviation Security (FAA/ACS) personnel and Northwest Airlines Security personnel. These elements were evaluated and refined at a Subject-Matter Expert (SME) workshop using Federal Bureau of Investigation (FBI), Immigration and Naturalization Service (INS), Customs, airline security personnel, and FAA personnel. A worksheet and scoring procedures for using the profiling elements were developed so that domestic passengers could be profiled by airline or other personnel. A field test of the feasibility of the Manual Domestic Passive Profiling (MDPP) worksheet was conducted at
NASA Technical Reports Server (NTRS)
1979-01-01
The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.
1984-06-29
sheet metal, machined and composite parts and assembling the components into final pruJucts o Planning, evaluating, testing, inspecting and...Research showed that current programs were pursuing the design and demonstration of integrated centers for sheet metal, machining and composite ...determine any metal parts required and to schedule these requirements from the machining center. Figure 3-33, Planned Composite Production, shows
ERIC Educational Resources Information Center
Proper, Elizabeth C.; And Others
This segment of the national evaluation study of the Follow Through Planned Variation Model discusses findings of analyses of achievement test data which have been adjusted to take into consideration the preschool experience of children in three Follow Through cohorts. These analyses serve as a supplement to analyses presented in Volume IV-A of…
Andrew Stubblefield; Shane Beach; Nicolas M. Harrison; Michelle Haskins
2017-01-01
The objective of this study is to test the effectiveness of California Forest Practice Rules and additional best management practices implemented as part of Humboldt Redwood Companyâs Habitat Conservation Plan and Watershed Analysis prescriptions, in limiting the delivery of management-derived sediment. A paired watershed study format is being utilized to...
Kerry, Matthew J; Embretson, Susan E
2017-01-01
Future time perspective (FTP) is defined as "perceptions of the future as being limited or open-ended" (Lang and Carstensen, 2002; p. 125). The construct figures prominently in both workplace and retirement domains, but the age-predictions are competing: Workplace research predicts decreasing FTP age-change, in contrast, retirement scholars predict increasing FTP age-change. For the first time, these competing predictions are pitted in an experimental manipulation of subjective life expectancy (SLE). A sample of N = 207 older adults (age 45-60) working full-time (>30-h/week) were randomly assigned to SLE questions framed as either 'Live-to' or 'Die-by' to evaluate competing predictions for FTP. Results indicate general support for decreasing age-change in FTP, indicated by independent-sample t -tests showing lower FTP in the 'Die-by' framing condition. Further general-linear model analyses were conducted to test for interaction effects of retirement planning with experimental framings on FTP and intended retirement; While retirement planning buffered FTP's decrease, simple-effects also revealed that retirement planning increased intentions for sooner retirement, but lack of planning increased intentions for later retirement. Discussion centers on practical implications of our findings and consequences validity evidence in future empirical research of FTP in both workplace and retirement domains.
NASA Technical Reports Server (NTRS)
1979-01-01
This document addresses requirements for post-test data reduction in support of the Orbital Flight Tests (OFT) mission evaluation team, specifically those which are planned to be implemented in the ODRC (Orbiter Data Reduction Complex). Only those requirements which have been previously baselined by the Data Systems and Analysis Directorate configuration control board are included. This document serves as the control document between Institutional Data Systems Division and the Integration Division for OFT mission evaluation data processing requirements, and shall be the basis for detailed design of ODRC data processing systems.
NASA electronic message experiment and study: Detailed test plans
NASA Technical Reports Server (NTRS)
1979-01-01
A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martino, C.
An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components,more » antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).« less
Symbol signing design for older drivers
DOT National Transportation Integrated Search
2012-09-01
This report presents the Surveys, Interviews, and Workshops Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congesti...
40 CFR 230.5 - General procedures to be followed.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Evaluation and Testing (§ 230.61). (j) Identify appropriate and practicable changes to the project plan to... of illustration. The actual process followed may be iterative, with the results of one step leading...
Atlanta congestion reduction demonstration. National evaluation : content analysis test plan.
DOT National Transportation Integrated Search
2000-05-30
Commercial Vehicle Information Systems and Networks (CVISN) is the collection of information systems and communication networks that support commercial vehicle operations (CVO.) The National ITS Architecture provides a technical framework that descri...
Atlanta congestion reduction demonstration. National evaluation : safety data test plan.
DOT National Transportation Integrated Search
1996-12-01
This paper describes the various advance technologies already in use in the intermodal freight transportation industry and addresses the opportunity for improved communication between the public and private sector regarding technology applications to...
40 CFR 230.5 - General procedures to be followed.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Evaluation and Testing (§ 230.61). (j) Identify appropriate and practicable changes to the project plan to... of illustration. The actual process followed may be iterative, with the results of one step leading...
Locomotive crash energy management test plans
DOT National Transportation Integrated Search
2015-03-23
The Office of Research, Development, and Technology of the Federal Railroad Administration (FRA) and the Volpe Center are continuing to evaluate new technologies for increasing the safety of passengers and operators in rail equipment. The results of ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ainsworth, Calvin C.
The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, andmore » continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.« less
NASA Astrophysics Data System (ADS)
Crowe, S. B.; Kairn, T.; Middlebrook, N.; Sutherland, B.; Hill, B.; Kenny, J.; Langton, C. M.; Trapp, J. V.
2015-03-01
This study aimed to provide a detailed evaluation and comparison of a range of modulated beam evaluation metrics, in terms of their correlation with QA testing results and their variation between treatment sites, for a large number of treatments. Ten metrics including the modulation index (MI), fluence map complexity, modulation complexity score (MCS), mean aperture displacement (MAD) and small aperture score (SAS) were evaluated for 546 beams from 122 intensity modulated radiotherapy (IMRT) and volumetric modulated arc therapy (VMAT) treatment plans targeting the anus, rectum, endometrium, brain, head and neck and prostate. The calculated sets of metrics were evaluated in terms of their relationships to each other and their correlation with the results of electronic portal imaging based quality assurance (QA) evaluations of the treatment beams. Evaluation of the MI, MAD and SAS suggested that beams used in treatments of the anus, rectum, head and neck were more complex than the prostate and brain treatment beams. Seven of the ten beam complexity metrics were found to be strongly correlated with the results from QA testing of the IMRT beams (p < 0.00008). For example, values of SAS (with multileaf collimator apertures narrower than 10 mm defined as ‘small’) less than 0.2 also identified QA passing IMRT beams with 100% specificity. However, few of the metrics are correlated with the results from QA testing of the VMAT beams, whether they were evaluated as whole 360° arcs or as 60° sub-arcs. Select evaluation of beam complexity metrics (at least MI, MCS and SAS) is therefore recommended, as an intermediate step in the IMRT QA chain. Such evaluation may also be useful as a means of periodically reviewing VMAT planning or optimiser performance.
Vanguard/PLACE experiment system design and test plan
NASA Technical Reports Server (NTRS)
Taylor, R. E.
1973-01-01
A system design and test plan are described for operational evaluation of the NASA-Goddard position location and aircraft communications equipment (PLACE), at C band (4/6GHz), using NASA's ship, the USNS Vanguard, and the ATS 3 and ATS 5 synchronous satellites. The Sea Test phase, extending from March 29, 1973 to April 15, 1973 was successfully completed; the principal objectives of the experiment were achieved. Typical PLACE-computed, position-location data is shown for the Vanguard. Position location and voice-quality measurements were excellent; ship position was determined within 2 nmi; high-quality, 2-way voice transmissions resulted as determined from audience participation, intelligibility and articulation-index analysis. A C band/L band satellite trilateration experiment is discussed.
A Team Approach to Management by Objectives with Special Emphasis on Managerial Self-Evaluation.
ERIC Educational Resources Information Center
Alvir, Howard P.
This kit contains everything needed to explain, criticize and plan, simulate, and evaluate a management by objectives (MBO) program. The kit has been field tested in state agencies, schools, businesses, and volunteer organizations. Rather than present only the strengths of MBO, this program defines MBO, presents its strong points in discussing the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon
The RELAP-7 code verification and validation activities are ongoing under the code assessment plan proposed in the previous document (INL-EXT-16-40015). Among the list of V&V test problems in the ‘RELAP-7 code V&V RTM (Requirements Traceability Matrix)’, the RELAP-7 7-equation model has been tested with additional demonstration problems and the results of these tests are reported in this document. In this report, we describe the testing process, the test cases that were conducted, and the results of the evaluation.
CSM digital autopilot testing in support of ASTP experiments control requirements
NASA Technical Reports Server (NTRS)
Rue, D. L.
1975-01-01
Results are presented of CSM digital autopilot (DAP) testing. The testing was performed to demonstrate and evaluate control modes which are currently planned or could be considered for use in support of experiments on the ASTP mission. The testing was performed on the Lockheed Guidance, Navigation, and Control System Functional Simulator (GNCFS). This simulator, which was designed to test the Apollo and Skylab DAP control system, has been used extensively and is a proven tool for CSM DAP analysis.
Assessing the Ability of Ground-Penetrating Radar to Detect Fungal Decay in Douglas-Fir Beams
Christopher Adam Senalik; James Wacker; Xiping Wang; F. Jalinoos
2016-01-01
This paper describes the testing plan and current progress for assessing the efficacy of using ground-penetrating radar (GPR) to detect fungal decay within Douglas-fir beams. Initially, the beams were assessed using a variety of physical, mechanical, and nondestructive evaluation (NDE) test methods including micro-resistance drilling, Janka hardness, ultrasonic...
Evaluating the habitat capability model for Merriam's turkeys
Mark A. Rumble; Stanley H. Anderson
1995-01-01
Habitat capability (HABCAP) models for wildlife assist land managers in predicting the consequences of their management decisions. Models must be tested and refined prior to using them in management planning. We tested the predicted patterns of habitat selection of the R2 HABCAP model using observed patterns of habitats selected by radio-marked Merriamâs turkey (
SU-F-T-271: Comparing IMRT QA Pass Rates Before and After MLC Calibration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mazza, A; Perrin, D; Fontenot, J
Purpose: To compare IMRT QA pass rates before and after an in-house MLC leaf calibration procedure. Methods: The MLC leaves and backup jaws on four Elekta linear accelerators with MLCi2 heads were calibrated using the EPID-based RIT Hancock Test as the means for evaluation. The MLCs were considered to be successfully calibrated when they could pass the Hancock Test with criteria of 1 mm jaw position tolerance, and 1 mm leaf position tolerance. IMRT QA results were collected pre- and postcalibration and analyzed using gamma analysis with 3%/3mm DTA criteria. AAPM TG-119 test plans were also compared pre- and post-calibration,more » at both 2%/2mm DTA and 3%/3mm DTA. Results: A weighted average was performed on the results for all four linear accelerators. The pre-calibration IMRT QA pass rate was 98.3 ± 0.1%, compared with the post-calibration pass rate of 98.5 ± 0.1%. The TG-119 test plan results showed more of an improvement, particularly at the 2%/2mm criteria. The averaged results were 89.1% pre and 96.1% post for the C-shape plan, 94.8% pre and 97.1% post for the multi-target plan, 98.6% pre and 99.7% post for the prostate plan, 94.7% pre and 94.8% post for the head/neck plan. Conclusion: The patient QA results did not show statistically significant improvement at the 3%/3mm DTA criteria after the MLC calibration procedure. However, the TG-119 test cases did show significant improvement at the 2%/2mm level.« less
SU-F-T-419: Evaluation of PlanIQ Feasibility DVH as Planning Objectives for Skull Base SBRT Patients
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, W; Wang, H; Chi, P
2016-06-15
Purpose: PlanIQ(Sun Nuclear Corporation) can provide feasibility measures on organs-at-risk(OARs) around the target based on depth, local anatomy density and energy of radiation beam used. This study is to test and evaluate PlanIQ feasibility DVHs as optimization objectives in the treatment planning process, and to investigate the potential to use them in routine clinical cases to improve planning efficiency. Methods: Two to three arcs VMAT Treatment plans were generated in Pinnacle based on PlanIQ feasibility DVH for six skull base patients who previously treated with SBRT. The PlanIQ feasibility DVH for each OAR consists of four zones – impossible (atmore » 100% target coverage), difficult, challenging and probable. Constrains to achieve DVH in difficult zone were used to start plan optimization. Further adjustment was made to improve coverage. The plan DVHs were compared to PlanIQ feasibility DVH to assess the dose received by 0%(D0), 5%(D5), 10%(D10) and 50%(D50) of the OAR volumes. Results: A total of 90 OARs were evaluated for 6 patients (mean 15 OARs, range 11–18 OARs). We used >98% PTV coverage as planning goal since it’s difficult to achieve 100% target coverage. For the generated plans, 96.7% of the OARs achieved D0 or D5 within difficult zone or impossible zone (ipsilateral OARs 93.5%, contralateral OARs 100%), while 90% and 65.6% of the OARs achieved D10 and D50 within difficult zone, respectively. Seventeen of the contralateral and out of field OARs achieved DVHs in impossible zone. For OARs adjacent or overlapped with target volume, the D0 and D5 are challenging to be optimized into difficult zone. All plans were completed within 2–4 adjustments to improve target coverage and uniformity. Conclusion: PlanIQ feasibility tool has the potential to provide difficult but achievable initial optimization objectives and therefore reduce the planning time to obtain a well optimized plan.« less
Regional Traffic Incident Management Programs : Implementation Guide
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects ...
Traffic conflict techniques for safety and operations : observers manual
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Institutional and Organizational Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. T...
A toolbox for alleviating traffic congestion and enhancing mobility
DOT National Transportation Integrated Search
2012-06-01
This report presents the Tolling Data Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonstra...
46 CFR 162.060-10 - Approval procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...
46 CFR 162.060-10 - Approval procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...
DOT National Transportation Integrated Search
1997-09-26
Appendices A & B of the "Implementation of the National Intelligent Transportation Systems Program", a report forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA).
Thermal Control System for a Small, Extended Duration Lunar Surface Science Platform
NASA Technical Reports Server (NTRS)
Bugby, D.; Farmer, J.; OConnor, B.; Wirzburger, M.; Abel, E.; Stouffer, C.
2010-01-01
The presentation slides include: Introduction: lunar mission definition, Problem: requirements/methodology, Concept: thermal switching options, Analysis: system evaluation, Plans: dual-radiator LHP (loop heat pipe) test bed, and Conclusions: from this study.
Share the road campaign research study : final report
DOT National Transportation Integrated Search
2012-07-01
This report presents the Environmental Data Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Dem...
Pinto, Paula Sanders Pereira; Iego, Sandro; Nunes, Samantha; Menezes, Hemanny; Mastrorosa, Rosana Sávio; Oliveira, Irismar Reis de; Rosário, Maria Conceição do
2011-03-01
This study investigates obsessive-compulsive disorder patients in terms of strategic planning and its association with specific obsessive-compulsive symptom dimensions. We evaluated 32 obsessive-compulsive disorder patients. Strategic planning was assessed by the Rey-Osterrieth Complex Figure Test, and the obsessive-compulsive dimensions were assessed by the Dimensional Yale-Brown Obsessive-Compulsive Scale. In the statistical analyses, the level of significance was set at 5%. We employed linear regression, including age, intelligence quotient, number of comorbidities, the Yale-Brown Obsessive-Compulsive Scale score, and the Dimensional Yale-Brown Obsessive-Compulsive Scale. The Dimensional Yale-Brown Obsessive-Compulsive Scale "worst-ever" score correlated significantly with the planning score on the copy portion of the Rey-Osterrieth Complex Figure Test (r = 0.4, p = 0.04) and was the only variable to show a significant association after linear regression (β = 0.55, t = 2.1, p = 0.04). Compulsive hoarding correlated positively with strategic planning (r = 0.44, p = 0.03). None of the remaining symptom dimensions presented any significant correlations with strategic planning. We found the severity of obsessive-compulsive symptoms to be associated with strategic planning. In addition, there was a significant positive association between the planning score on the copy portion of the Rey-Osterrieth Complex Figure Test copy score and the hoarding dimension score on the Dimensional Yale-Brown Obsessive-Compulsive Scale. Our results underscore the idea that obsessive-compulsive disorder is a heterogeneous disorder and suggest that the hoarding dimension has a specific neuropsychological profile. Therefore, it is important to assess the peculiarities of each obsessive-compulsive symptom dimension.
Ares 1 First Stage Design, Development, Test, and Evaluation
NASA Technical Reports Server (NTRS)
Williams, Tom; Cannon, Scott
2006-01-01
The Ares I Crew Launch Vehicle (CLV) is an integral part of NASA s exploration architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Currently in the system definition phase, the CLV is planned to replace the Space Shuttle for crew transport in the post 2010 time frame. It is comprised of a solid rocket booster (SRB) first stage derived from the current Space Shuttle SRB, a liquid oxygen/hydrogen fueled second stage utilizing a derivative of the Apollo upper stage engine for propulsion, and a Crew Exploration Vehicle (CEV) composed of command and service modules. This paper deals with current design, development, test, and evaluation planning for the CLV first stage SRB. Described are the current overall point-of-departure design and booster subsystems, systems engineering approach, and milestone schedule requirements.
NASA Technical Reports Server (NTRS)
Ary, A.; Axtell, C.; Fogg, L.; Jackson, A.; James, A. M.; Mosesian, B.; Vanderwier, J.; Vanhamersveld, J.
1976-01-01
The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes the front and rear spars. Various design options were evaluated to arrive at a configuration which would offer the highest potential for satisfying program objectives. The preferred configuration selected consists of a hat-stiffened cover with molded integrally stiffened spars, aluminum trussed composite ribs, and composite miniwich web ribs with integrally molded caps. Material screening tests were performed to select an advanced composite material system for the Advanced Composite Vertical Fin (ACFV) that would meet the program requirements from the standpoint of quality, reproducibility, and cost. Preliminary weight and cost analysis were made, targets established, and tracking plans developed. These include FAA certification, ancillary test program, quality control, and structural integrity control plans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chancellor, Christopher John
2016-11-07
The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scopingmore » studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.« less
Antibiotics are the Most Commonly Identified Cause of Perioperative Hypersensitivity Reactions
Kuhlen, James L.; Camargo, Carlos A.; Balekian, Diana S.; Blumenthal, Kimberly G.; Guyer, Autumn; Morris, Theresa; Long, Aidan; Banerji, Aleena
2016-01-01
Background Hypersensitivity reactions (HSR) during the perioperative period are unpredictable and can be life threatening. Prospective studies for evaluation of perioperative HSR are lacking and data on causative agents varies between different studies. Objective To prospectively determine the success of a comprehensive allergy evaluation plan for patients with HSR during anesthesia, including identification of causative agent and outcomes during subsequent anesthesia exposure. Methods All patients referred for perioperative HSR between November 2013 and March 2015, from a Boston teaching hospital, were evaluated using a standardized protocol with skin testing (ST) within 6 months of HSR. Comprehensive allergy evaluation included collection of patient information, including characteristics of HSR during anesthesia. We reviewed results of ST and/or test doses for all potential causative medications Event-related tryptase levels were reviewed when available. Results Over 17 months, 25 patients completed the comprehensive allergy evaluation. Fifty-two percent (13/25) were female with a median age of 52 (IQR 43–66) years. The most frequently observed HSR systems were cutaneous (68%), cardiovascular (64%), and pulmonary (24%). A culprit drug, defined as a positive ST, was identified in 36% (9/25) of patients. The most common agent identified was cefazolin (6/9). Following our comprehensive evaluation and management plan, seven (7/8, 88%) patients tolerated subsequent anesthesia. Conclusions Cefazolin was the most commonly identified cause of perioperative HSR in our study population. Skin testing patients within 6 months of a perioperative HSR may improve the odds of finding a positive result. Tolerance of subsequent anesthesia is generally achieved in patients undergoing our comprehensive evaluation. PMID:27039234
Tzeel, Albert; Lawnicki, Victor; Pemble, Kim R
2011-07-01
As emergency department utilization continues to increase, health plans must limit their cost exposure, which may be driven by duplicate testing and a lack of medical history at the point of care. Based on previous studies, health information exchanges (HIEs) can potentially provide health plans with the ability to address this need. To assess the effectiveness of a community-based HIE in controlling plan costs arising from emergency department care for a health plan's members. Albert Tzeel. The study design was observational, with an eligible population (N = 1482) of fully insured plan members who sought emergency department care on at least 2 occasions during the study period, from December 2008 through March 2010. Cost and utilization data, obtained from member claims, were matched to a list of persons utilizing the emergency department where HIE querying could have occurred. Eligible members underwent propensity score matching to create a test group (N = 326) in which the HIE database was queried in all emergency department visits, and a control group (N = 325) in which the HIE database was not queried in any emergency department visit. Post-propensity matching analysis showed that the test group achieved an average savings of $29 per emergency department visit compared with the control group. Decreased utilization of imaging procedures and diagnostic tests drove this cost-savings. When clinicians utilize HIE in the care of patients who present to the emergency department, the costs borne by a health plan providing coverage for these patients decrease. Although many factors can play a role in this finding, it is likely that HIEs obviate unnecessary service utilization through provision of historical medical information regarding specific patients at the point of care.
Preclinical evaluation of hydrogel sealed fluropassivated indigenous vascular prosthesis.
Unnikrishnan, Madathipat; Umashankar, P R; Viswanathan, Sidharth; Savlania, Ajay; Joseph, Roy; Muraleedharan, C V; Agrawal, Vivek; Shenoy, Sachin J; Krishnan, Lissy K; Mohanan, P V; Sabareeswaran, A
2017-11-01
Polyethylene terephthalate (PET) graft, designed and developed at our institute for vascular reconstruction, is porous to promote optimal incorporation and neointima formation, requiring pre-clotting or biomodification by sealing the pores before implantation. The objective of this study was to characterize, test and perform preclinical evaluation of hydrogel (alginate dialdehyde cross-linked gelatin) sealed fluoropassivated PET vascular prosthesis in pig model, so as to avoid pre-clotting, for its safety and efficacy before employing the indigenous and less expensive graft for clinical use. Hydrogel sealed, fluoropassivated PET vascular prosthesis were tested for haemocompatibility and toxicity followed by small animal toxicology tests and in vivo experiments in pigs receiving implantation at thoracic aorta. All 33 animals received test as well as control grafts with a plan for phased explantation at 2, 12 and 26 weeks. All animals underwent completion angiogram at the end of procedure as well as before graft explantation. Haemocompatibility tests for haemolysis and toxicity tests showed no adverse events in tested mice and rabbits. Completion angiogram showed intact anastamosis and patent graft in each animal in post-operative period and at explantation. Gross and histopathological examination showed well-encapsulated grafts, clean glistening neointima and no evidence of thrombus in both test and control grafts. Hydrogel sealed, fluoropassivated PET vascular prosthesis was found non-toxic, haemocompatible and remained patent in in vivo studies at planned intervals.
Preclinical evaluation of hydrogel sealed fluropassivated indigenous vascular prosthesis
Unnikrishnan, Madathipat; Umashankar, P.R.; Viswanathan, Sidharth; Savlania, Ajay; Joseph, Roy; Muraleedharan, C.V.; Agrawal, Vivek; Shenoy, Sachin J.; Krishnan, Lissy K.; Mohanan, P.V.; Sabareeswaran, A.
2017-01-01
Background & objectives: Polyethylene terephthalate (PET) graft, designed and developed at our institute for vascular reconstruction, is porous to promote optimal incorporation and neointima formation, requiring pre-clotting or biomodification by sealing the pores before implantation. The objective of this study was to characterize, test and perform preclinical evaluation of hydrogel (alginate dialdehyde cross-linked gelatin) sealed fluoropassivated PET vascular prosthesis in pig model, so as to avoid pre-clotting, for its safety and efficacy before employing the indigenous and less expensive graft for clinical use. Methods: Hydrogel sealed, fluoropassivated PET vascular prosthesis were tested for haemocompatibility and toxicity followed by small animal toxicology tests and in vivo experiments in pigs receiving implantation at thoracic aorta. All 33 animals received test as well as control grafts with a plan for phased explantation at 2, 12 and 26 weeks. All animals underwent completion angiogram at the end of procedure as well as before graft explantation. Results: Haemocompatibility tests for haemolysis and toxicity tests showed no adverse events in tested mice and rabbits. Completion angiogram showed intact anastamosis and patent graft in each animal in post-operative period and at explantation. Gross and histopathological examination showed well-encapsulated grafts, clean glistening neointima and no evidence of thrombus in both test and control grafts. Interpretation & conclusions: Hydrogel sealed, fluoropassivated PET vascular prosthesis was found non-toxic, haemocompatible and remained patent in in vivo studies at planned intervals. PMID:29512608
Wen, Ning; Kim, Joshua; Doemer, Anthony; Glide-Hurst, Carri; Chetty, Indrin J; Liu, Chang; Laugeman, Eric; Xhaferllari, Ilma; Kumarasiri, Akila; Victoria, James; Bellon, Maria; Kalkanis, Steve; Siddiqui, M Salim; Movsas, Benjamin
2018-06-01
The purpose of this study was to investigate the systematic localization accuracy, treatment planning capability, and delivery accuracy of an integrated magnetic resonance imaging guided Linear Accelerator (MR-Linac) platform for stereotactic radiosurgery. The phantom for the end-to-end test comprises three different compartments: a rectangular MR/CT target phantom, a Winston-Lutz cube, and a rectangular MR/CT isocenter phantom. Hidden target tests were performed at gantry angles of 0, 90, 180, and 270 degrees to quantify the systematic accuracy. Five patient plans with a total of eleven lesions were used to evaluate the dosimetric accuracy. Single-isocenter IMRT treatment plans using 10-15 coplanar beams were generated to treat the multiple metastases. The end-to-end localization accuracy of the system was 1.0 ± 0.1 mm. The conformity index, homogeneity index and gradient index of the plans were 1.26 ± 0.22, 1.22 ± 0.10, and 5.38 ± 1.44, respectively. The average absolute point dose difference between measured and calculated dose was 1.64 ± 1.90%, and the mean percentage of points passing the 3%/1 mm gamma criteria was 96.87%. Our experience demonstrates that excellent plan quality and delivery accuracy was achievable on the MR-Linac for treating multiple brain metastases with a single isocenter. Copyright © 2018 Elsevier B.V. All rights reserved.
SU-E-T-60: A Plan Quality Index in IMRT QA That Is Independent of the Acceptance Criteria
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, D; Kang, S; Kim, T
2015-06-15
Purpose: In IMRT QA, plan quality evaluation is made based on pass rate under preset acceptance criteria, mostly using gamma-values. This method is convenient but, its Result highly depends on what the acceptance criteria are and suffers from the lack of sensitivity in judging how good the plan is. In this study, we introduced a simple but effective plan quality index of IMRT QA based on dose difference only to supplement such shortcomings, and investigated its validity. Methods: The proposed index is a single value which is calculated mainly based on point-by-point comparison between planned and measured dose distributions, andmore » it becomes “1” in an ideal case. A systematic evaluation was performed with one-dimensional test dose distributions. For 3 hypothetical dose profiles, various displacements (in both dose and space) were introduced, the proposed index was calculated for each case, and the behavior of obtained indices was analyzed and compared with that of gamma evaluation. In addition, the feasibility of the index was assessed with clinical IMRT/VMAT/SBRT QA cases for different sites (prostate, head & neck, liver, lung, spine, and abdomen). Results: The proposed index showed more robust correlation with the amount of induced displacement compared to the gamma evaluation method. No matter what the acceptance criteria are (e.g., whether 3%/3mm or 2%/2mm), it was possible to clearly rank every case with the proposed index while it was difficult to do with the gamma evaluation method. Conclusion: IMRT plan quality can be evaluated quantitatively by the proposed index. It is considered that the proposed index would provide useful information for better judging the level of goodness of each plan and its Result is independent of the acceptance criteria. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guthier, C; University Medical Center Mannheim, Mannheim; Harvard Medical School, Boston, MA
Purpose: Inverse treatment planning (ITP) for interstitial HDR brachytherapy of gynecologic cancers seeks to maximize coverage of the clinical target volumes (tumor and vagina) while respecting dose-volume-histogram related dosimetric measures (DMs) for organs at risk (OARs). Commercially available ITP tools do not support DM-based planning because it is computationally too expensive to solve. In this study we present a novel approach that allows fast ITP for gynecologic cancers based on DMs for the first time. Methods: This novel strategy is an optimization model based on a smooth DM-based objective function. The smooth approximation is achieved by utilizing a logistic functionmore » for the evaluation of DMs. The resulting nonconvex and constrained optimization problem is then optimized with a BFGS algorithm. The model was evaluated using the implant geometry extracted from 20 patient treatment plans under an IRB-approved retrospective study. For each plan, the final DMs were evaluated and compared to the original clinical plans. The CTVs were the contoured tumor volume and the contoured surface of the vagina. Statistical significance was evaluated with a one-sided paired Wilcoxon signed-rank test. Results: As did the clinical plans, all generated plans fulfilled the defined DMs for OARs. The proposed strategy showed a statistically significant improvement (p<0.001) in coverage of the tumor and vagina, with absolute improvements of related DMs of (6.9 +/− 7.9)% and (28.2 +/− 12.0)%, respectively. This was achieved with a statistically significant (p<0.01) decrease of the high-dose-related DM for the tumor. The runtime of the optimization was (2.3 +/− 2.0) seconds. Conclusion: We demonstrated using clinical data that our novel approach allows rapid DM-based optimization with improved coverage of CTVs with fewer hot spots. Being up to three orders of magnitude faster than the current clinical practice, the method dramatically shortens planning time.« less
Cognitive domains that predict time to diagnosis in prodromal Huntington disease.
Harrington, Deborah Lynn; Smith, Megan M; Zhang, Ying; Carlozzi, Noelle E; Paulsen, Jane S
2012-06-01
Prodromal Huntington's disease (prHD) is associated with a myriad of cognitive changes but the domains that best predict time to clinical diagnosis have not been studied. This is a notable gap because some domains may be more sensitive to cognitive decline, which would inform clinical trials. The present study sought to characterise cognitive domains underlying a large test battery and for the first time, evaluate their ability to predict time to diagnosis. Participants included gene negative and gene positive prHD participants who were enrolled in the PREDICT-HD study. The CAG-age product (CAP) score was the measure of an individual's genetic signature. A factor analysis of 18 tests was performed to identify sets of measures or latent factors that elucidated core constructs of tests. Factor scores were then fit to a survival model to evaluate their ability to predict time to diagnosis. Six factors were identified: (1) speed/inhibition, (2) verbal working memory, (3) motor planning/speed, (4) attention-information integration, (5) sensory-perceptual processing and (6) verbal learning/memory. Factor scores were sensitive to worsening of cognitive functioning in prHD, typically more so than performances on individual tests comprising the factors. Only the motor planning/speed and sensory-perceptual processing factors predicted time to diagnosis, after controlling for CAP scores and motor symptoms. Conclusions The results suggest that motor planning/speed and sensory-perceptual processing are important markers of disease prognosis. The findings also have implications for using composite indices of cognition in preventive Huntington's disease trials where they may be more sensitive than individual tests.
NASA Technical Reports Server (NTRS)
On, F. J.
1975-01-01
Test methods were evaluated to ascertain whether a spacecraft, properly tested within its shroud, could be vibroacoustic tested without the shroud, with adjustments made in the acoustic input spectra to simulate the acoustic response of the missing shroud. The evaluation was based on vibroacoustic test results obtained from a baseline model composed (1) of a spacecraft with adapter, lower support structure, and shroud; (2) of the spacecraft, adapter, and lower structure, but without the shroud; and (3) of the spacecraft and adapter only. Emphasis was placed on the magnitude of the acoustic input changes required to substitute for the shroud and the difficulty of making such input changes, and the degree of missimulation which can result from the performance of a particular, less-than optimum test. Conclusions are drawn on the advantages and disadvantages derived from the use of input spectra adjustment methods and lower support structure simulations. Test guidelines were also developed for planning and performing a launch acoustic-environmental test.
NASA Technical Reports Server (NTRS)
Hodgson, Edward; Oehler, William; Dionne, Steve; Converse, David; Jennings, Mallory A.
2012-01-01
NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
Kuo, Shu-Yu; Chen, Yu-Ting; Chang, Yu-Kai; Lee, Pi-Hsia; Liu, Mei-Ju; Chen, Su-Ru
2018-01-31
This study aims to evaluate the executive function and learning attention in children with internet addiction (IA). Children aged 10-12 were screened by Chinese Internet Addiction Scale to compose the IA group and internet nonaddiction group. Their executive functions were evaluated by Stroop color and word test, Wisconsin card sorting test, and Wechsler digit span test. Learning attention was evaluated by Chinese concentration questionnaire. Executive function and learning attention were lower in the IA group than in the internet nonaddiction group. Executive function and learning attention are compromised by IA in children. Early interventions into the IA should be planned to maintain the normal development of executive function and learning attention in childhood. © 2018 Wiley Periodicals, Inc.
The structure of affective action representations: temporal binding of affective response codes.
Eder, Andreas B; Müsseler, Jochen; Hommel, Bernhard
2012-01-01
Two experiments examined the hypothesis that preparing an action with a specific affective connotation involves the binding of this action to an affective code reflecting this connotation. This integration into an action plan should lead to a temporary occupation of the affective code, which should impair the concurrent representation of affectively congruent events, such as the planning of another action with the same valence. This hypothesis was tested with a dual-task setup that required a speeded choice between approach- and avoidance-type lever movements after having planned and before having executed an evaluative button press. In line with the code-occupation hypothesis, slower lever movements were observed when the lever movement was affectively compatible with the prepared evaluative button press than when the two actions were affectively incompatible. Lever movements related to approach and avoidance and evaluative button presses thus seem to share a code that represents affective meaning. A model of affective action control that is based on the theory of event coding is discussed.
Primate amygdala neurons evaluate the progress of self-defined economic choice sequences
Grabenhorst, Fabian; Hernadi, Istvan; Schultz, Wolfram
2016-01-01
The amygdala is a prime valuation structure yet its functions in advanced behaviors are poorly understood. We tested whether individual amygdala neurons encode a critical requirement for goal-directed behavior: the evaluation of progress during sequential choices. As monkeys progressed through choice sequences toward rewards, amygdala neurons showed phasic, gradually increasing responses over successive choice steps. These responses occurred in the absence of external progress cues or motor preplanning. They were often specific to self-defined sequences, typically disappearing during instructed control sequences with similar reward expectation. Their build-up rate reflected prospectively the forthcoming choice sequence, suggesting adaptation to an internal plan. Population decoding demonstrated a high-accuracy progress code. These findings indicate that amygdala neurons evaluate the progress of planned, self-defined behavioral sequences. Such progress signals seem essential for aligning stepwise choices with internal plans. Their presence in amygdala neurons may inform understanding of human conditions with amygdala dysfunction and deregulated reward pursuit. DOI: http://dx.doi.org/10.7554/eLife.18731.001 PMID:27731795
Primate amygdala neurons evaluate the progress of self-defined economic choice sequences.
Grabenhorst, Fabian; Hernadi, Istvan; Schultz, Wolfram
2016-10-12
The amygdala is a prime valuation structure yet its functions in advanced behaviors are poorly understood. We tested whether individual amygdala neurons encode a critical requirement for goal-directed behavior: the evaluation of progress during sequential choices. As monkeys progressed through choice sequences toward rewards, amygdala neurons showed phasic, gradually increasing responses over successive choice steps. These responses occurred in the absence of external progress cues or motor preplanning. They were often specific to self-defined sequences, typically disappearing during instructed control sequences with similar reward expectation. Their build-up rate reflected prospectively the forthcoming choice sequence, suggesting adaptation to an internal plan. Population decoding demonstrated a high-accuracy progress code. These findings indicate that amygdala neurons evaluate the progress of planned, self-defined behavioral sequences. Such progress signals seem essential for aligning stepwise choices with internal plans. Their presence in amygdala neurons may inform understanding of human conditions with amygdala dysfunction and deregulated reward pursuit.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Yuchuan; Deng, Min; Zhou, Xiaojuan
To evaluate the lung sparing in intensity-modulated radiation therapy (IMRT) for patients with upper thoracic esophageal tumors extending inferiorly to the thorax by different beam arrangement. Overall, 15 patient cases with cancer of upper thoracic esophagus were selected for a retrospective treatment-planning study. Intensity-modulated radiation therapy plans using 4, 5, and 7 beams (4B, 5B, and 7B) were developed for each patient by direct machine parameter optimization (DMPO). All plans were evaluated with respect to dose volumes to irradiated targets and normal structures, with statistical comparisons made between 4B with 5B and 7B intensity-modulated radiation therapy plans. Differences among plansmore » were evaluated using a two-tailed Friedman test at a statistical significance of p < 0.05. The maximum dose, average dose, and the conformity index (CI) of planning target volume 1 (PTV1) were similar for 3 plans for each case. No significant difference of coverage for planning target volume 1 and maximum dose for spinal cords were observed among 3 plans in present study (p > 0.05). The average V{sub 5}, V{sub 13}, V{sub 20}, mean lung dose, and generalized equivalent uniform dose (gEUD) for the total lung were significantly lower in 4B-plans than those data in 5B-plans and 7B-plans (p < 0.01). Although the average V{sub 30} for the total lung were significantly higher in 4B-plans than those in 5B-plans and 7B-plans (p < 0.05). In addition, when comparing with the 4B-plans, the conformity/heterogeneity index of the 5B- and 7B-plans were significantly superior (p < 0.05). The 4B-intensity-modulated radiation therapy plan has advantage to address the specialized problem of lung sparing to low- and intermediate-dose exposure in the thorax when dealing with relative long tumors extended inferiorly to the thoracic esophagus for upper esophageal carcinoma with the cost for less conformity. Studies are needed to compare the superiority of volumetric modulated arc therapy with intensity-modulated radiation therapy technique.« less
A Shovel-Ready Solution to Fill the Nursing Data Gap in the Interdisciplinary Clinical Picture.
Keenan, Gail M; Lopez, Karen Dunn; Sousa, Vanessa E C; Stifter, Janet; Macieira, Tamara G R; Boyd, Andrew D; Yao, Yingwei; Herdman, T Heather; Moorhead, Sue; McDaniel, Anna; Wilkie, Diana J
2018-01-01
To critically evaluate 2014 American Academy of Nursing (AAN) call-to-action plan for generating interoperable nursing data. Healthcare literature. AAN's plan will not generate the nursing data needed to participate in big data science initiatives in the short term because Logical Observation Identifiers Names and Codes and Systematized Nomenclature of Medicine - Clinical Terms are not yet ripe for generating interoperable data. Well-tested viable alternatives exist. Authors present recommendations for revisions to AAN's plan and an evidence-based alternative to generating interoperable nursing data in the near term. These revisions can ultimately lead to the proposed terminology goals of the AAN's plan in the long term. © 2017 NANDA International, Inc.
Payne, Alexander R; Plimmer, Beryl; McDaid, Andrew; Davies, T Claire
2017-05-01
The effects of cerebral palsy on movement planning for simple reaching tasks are not well understood. Movement planning is complex and entails many processes which could be affected. This study specifically sought to evaluate integrating task information, decoupling movements, and adjusting to altered mapping. For a reaching task, the asynchrony between the eye onset and the hand onset was measured across different movement planning conditions for participants with and without cerebral palsy. Previous research shows people without cerebral palsy vary this temporal coordination for different planning conditions. Our measurements show similar adaptations in temporal coordination for groups with and without cerebral palsy, to three of the four variations in planning condition tested. However, movement durations were still longer for the participants with cerebral palsy. Hence for simple goal-directed reaching, movement execution problems appear to limit activity more than movement planning deficits.
Contraceptive social marketing: a continuous cycle of planning, testing and evaluating.
1985-01-01
This article outlines the contraceptive marketing process used by the Social Marketing for Change (SOMARC) project. The 1st stage of the process involves analysis of the market, the consumer, and the social marketing organization's capabilities. In the 2nd stage, planning, data collected in the analysis stage are used to define objectives, segment target markets, and devise strategies for each element in the marketing mix. In the 3rd stage, all the elements in the marketing mix are developed and tested (e.g. product concepts, pricing, packaging, communication messages) and refined on the basis of test results. In stage 4, the action plan is implemented and marketing progress and institutional performance are monitored. Stage 5 includes an assessment of in-market effectiveness in terms of responses from consumers, retailers, and health professionals. The last stage feeds back to the 1st. All the reviewed data are recycled into analysis to begin again the continuous process of refinement and improvement.
A methodological approach for designing a usable ontology-based GUI in healthcare.
Lasierra, N; Kushniruk, A; Alesanco, A; Borycki, E; García, J
2013-01-01
This paper presents a methodological approach to the design and evaluation of an interface for an ontology-based system used for designing care plans for monitoring patients at home. In order to define the care plans, physicians need a tool for creating instances of the ontology and configuring some rules. Our purpose is to develop an interface to allow clinicians to interact with the ontology. Although ontology-driven applications do not necessarily present the ontology in the user interface, it is our hypothesis that showing selected parts of the ontology in a "usable" way could enhance clinician's understanding and make easier the definition of the care plans. Based on prototyping and iterative testing, this methodology combines visualization techniques and usability methods. Preliminary results obtained after a formative evaluation indicate the effectiveness of suggested combination.
Quantifying the process and outcomes of person-centered planning.
Holburn, S; Jacobson, J W; Vietze, P M; Schwartz, A A; Sersen, E
2000-09-01
Although person-centered planning is a popular approach in the field of developmental disabilities, there has been little systematic assessment of its process and outcomes. To measure person-centered planning, we developed three instruments designed to assess its various aspects. We then constructed variables comprising both a Process and an Outcome Index using a combined rational-empirical method. Test-retest reliability and measures of internal consistency appeared adequate. Variable correlations and factor analysis were generally consistent with our conceptualization and resulting item and variable classifications. Practical implications for intervention integrity, program evaluation, and organizational performance are discussed.
Biswas, Kamal K; Pearson, Erin; Shahidullah, S M; Sultana, Sharmin; Chowdhury, Rezwana; Andersen, Kathryn L
2017-03-11
In Bangladesh, abortion is restricted except to save the life of a woman, but menstrual regulation is allowed to induce menstruation and return to non-pregnancy after a missed period. MR services are typically provided through the Directorate General of Family Planning, while postabortion care services for incomplete abortion are provided by facilities under the Directorate General of Health Services. The bifurcated health system results in reduced quality of care, particularly for postabortion care patients whose procedures are often performed using sub-optimal uterine evacuation technology and typically do not receive postabortion contraceptive services. This study evaluated the success of a pilot project that aimed to integrate menstrual regulation, postabortion care and family planning services across six Directorate General of Health Services and Directorate General of Family Planning facilities by training providers on woman-centered abortion care and adding family planning services at sites offering postabortion care. A pre-post evaluation was conducted in the six large intervention facilities. Structured client exit interviews were administered to all uterine evacuation clients presenting in the 2-week data collection period for each facility at baseline (n = 105; December 2011-January 2012) and endline (n = 107; February-March 2013). Primary outcomes included service integration indicators such as provision of menstrual regulation, postabortion care and family planning services in both facility types, and quality of care indicators such as provision of pain management, provider communication and women's satisfaction with the services received. Outcomes were compared between baseline and endline for Directorate General of Family Planning and Directorate General of Health Services facilities, and chi-square tests and t-tests were used to test for differences between baseline and endline. At the end of the project there was an increase in menstrual regulation service provision in Directorate General of Health Services facilities, from none at baseline to 44.1% of uterine evacuation services at endline (p < 0.001). The proportion of women accepting a postabortion contraceptive method increased from 14.3% at baseline to 69.2% at endline in Directorate General of Health Services facilities (p = 0.006). Provider communication and women's rating of the care they received increased significantly in both Directorate General of Health Services and Directorate General of Family Planning facilities. Integration of menstrual regulation, postabortion care and family planning services is feasible in Bangladesh over a relatively short period of time. The intervention's focus on woman-centered abortion care also improved quality of care. This model can be scaled up through the public health system to ensure women's access to safe uterine evacuation services across all facility types in Bangladesh.
Development of 3-D Ice Accretion Measurement Method
NASA Technical Reports Server (NTRS)
Lee, Sam; Broeren, Andy P.; Addy, Harold E., Jr.; Sills, Robert; Pifer, Ellen M.
2012-01-01
A research plan is currently being implemented by NASA to develop and validate the use of a commercial laser scanner to record and archive fully three-dimensional (3-D) ice shapes from an icing wind tunnel. The plan focused specifically upon measuring ice accreted in the NASA Icing Research Tunnel (IRT). The plan was divided into two phases. The first phase was the identification and selection of the laser scanning system and the post-processing software to purchase and develop further. The second phase was the implementation and validation of the selected system through a series of icing and aerodynamic tests. Phase I of the research plan has been completed. It consisted of evaluating several scanning hardware and software systems against an established selection criteria through demonstrations in the IRT. The results of Phase I showed that all of the scanning systems that were evaluated were equally capable of scanning ice shapes. The factors that differentiated the scanners were ease of use and the ability to operate in a wide range of IRT environmental conditions.
Integrated test plan for directional boring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volk, B.W.
This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department ofmore » Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing.« less
NASA Technical Reports Server (NTRS)
DeLoach, Richard; Micol, John R.
2011-01-01
The factors that determine data volume requirements in a typical wind tunnel test are identified. It is suggested that productivity in wind tunnel testing can be enhanced by managing the inference error risk associated with evaluating residuals in a response surface modeling experiment. The relationship between minimum data volume requirements and the factors upon which they depend is described and certain simplifications to this relationship are realized when specific model adequacy criteria are adopted. The question of response model residual evaluation is treated and certain practical aspects of response surface modeling are considered, including inference subspace truncation. A wind tunnel test plan developed by using the Modern Design of Experiments illustrates the advantages of an early estimate of data volume requirements. Comparisons are made with a representative One Factor At a Time (OFAT) wind tunnel test matrix developed to evaluate a surface to air missile.
UAS in the NAS Flight Test Series 4 Overview
NASA Technical Reports Server (NTRS)
Murphy, Jim
2016-01-01
Flight Test Series 4 (FT4) provides the researchers with an opportunity to expand on the data collected during the first flight tests. Following Flight Test Series 3, additional scripted encounters with different aircraft performance and sensors will be conducted. FT4 is presently planned for Spring of 2016 to ensure collection of data to support the validation of the final RTCA Phase 1 DAA (Detect and Avoid) Minimum Operational Performance Standards (MOPS). There are three research objectives associated with this goal: Evaluate the performance of the DAA system against cooperative and non-cooperative aircraft encounters Evaluate UAS (Unmanned Aircraft Systems) pilot performance in response to DAA maneuver guidance and alerting with live intruder encounters Evaluate TCAS/DAA (Traffic Alert and Collision Avoidance System/Detect and Avoid) interoperability. This flight test series will focus on only the Scripted Encounters configuration, supporting the collection of data to validate the interoperability of DAA and collision avoidance algorithms.
Pilaete, Karen; De Medts, Joris; Delsupehe, Kathelijne Godelieve
2014-05-01
Drug-induced sleep endoscopy (DISE) is a new tool in the work-up of patients with sleep-disordered breathing (SDB). We assessed the impact of DISE on the treatment plan of snoring patients. This is a single institution prospective longitudinal clinical trial. The setting is a private teaching hospital. A consecutive series of 100 snoring patients prospectively underwent a standardised questionnaire, clinical examination, rhinomanometry, allergy skin prick testing, DISE and polysomnography. Management plan before and after DISE evaluation was compared. In 61 patients (excluding 16 patients sent for continuous positive airway pressure, three patients refused sleep endoscopy and 20 were lost to follow-up), we compared the treatment plans. DISE showed single level airway collapse in 13 and multilevel collapse in 48 patients. The site of flutter did not add additional information as compared to the pattern and the location of the collapse. After DISE, the initial management plan changed in 41% of patients irrespective of the type of initial management plan. The only somewhat accurate initial treatment plan was uvulopalatopharyngoplasty (unchanged in 11/13 patients). Excluding moderate to severe obstructive sleep apnea patients DISE is an indispensable tool in treatment decision in all SDB patients. We suggest to simplify the protocol for DISE reporting.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartholomew, Rachel A.; Ozanich, Richard M.; Arce, Jennifer S.
2017-02-01
The goal of this testing was to evaluate the ability of currently available commercial off-the-shelf (COTS) biological indicator tests and immunoassays to detect Bacillus anthracis (Ba) spores and ricin. In general, immunoassays provide more specific identification of biological threats as compared to indicator tests [3]. Many of these detection products are widely used by first responders and other end users. In most cases, performance data for these instruments are supplied directly from the manufacturer, but have not been verified by an external, independent assessment [1]. Our test plan modules included assessments of inclusivity (ability to generate true positive results), commonlymore » encountered hoax powders (which can cause potential interferences or false positives), and estimation of limit of detection (LOD) (sensitivity) testing.« less
Acceptance testing for PACS: from methodology to design to implementation
NASA Astrophysics Data System (ADS)
Liu, Brent J.; Huang, H. K.
2004-04-01
Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.
DOT National Transportation Integrated Search
1997-09-19
The term National Intelligent Transportation Infrastructure (NITI) refers to the integrated electronics, communications, and hardware and software elements that can support Intelligent Transportation System (ITS) services and products. NITI is not ju...
Development of the North American cargo securement standard
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pr...
34 CFR 300.34 - Related services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... prevention of hearing loss; (v) Counseling and guidance of children, parents, and teachers regarding hearing... by psychological tests, interviews, direct observation, and behavioral evaluations; (v) Planning and... guidance of parents, children, and teachers regarding speech and language impairments. (16) Transportation...
34 CFR 300.34 - Related services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... prevention of hearing loss; (v) Counseling and guidance of children, parents, and teachers regarding hearing... by psychological tests, interviews, direct observation, and behavioral evaluations; (v) Planning and... guidance of parents, children, and teachers regarding speech and language impairments. (16) Transportation...
34 CFR 300.34 - Related services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... prevention of hearing loss; (v) Counseling and guidance of children, parents, and teachers regarding hearing... by psychological tests, interviews, direct observation, and behavioral evaluations; (v) Planning and... guidance of parents, children, and teachers regarding speech and language impairments. (16) Transportation...
34 CFR 300.34 - Related services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... prevention of hearing loss; (v) Counseling and guidance of children, parents, and teachers regarding hearing... by psychological tests, interviews, direct observation, and behavioral evaluations; (v) Planning and... guidance of parents, children, and teachers regarding speech and language impairments. (16) Transportation...
Improvements in Symbol Sign Design To Aid Older Drivers
DOT National Transportation Integrated Search
2012-08-01
This report presents the Traffic System Data Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) Pr...
Friction evaluation of concrete paver blocks for airport pavement applications
NASA Technical Reports Server (NTRS)
Yager, Thomas J.
1992-01-01
The development and use of concrete paver blocks is reviewed and some general specifications for application of this type of pavement surface at airport facilities are given. Two different shapes of interlocking concrete paver blocks installed in the track surface at NASA Langley's Aircraft Landing Dynamics Facility (ALDF) are described. Preliminary cornering performance results from testing of 40 x 14 radial-belted and bias-ply aircraft tires are reviewed. These tire tests are part of a larger, ongoing joint NASA/FAA/Industry Surface Traction and Radial Tire (START) Program involving several different tire sizes. Both dry and wet surface conditions were evaluated on the two concrete paver block test surfaces and a conventional, nongrooved Portland cement concrete surface. Future test plans involving evaluation of other concrete paver block designs at the ALDF are indicated.
Chaikh, Abdulhamid; Balosso, Jacques
2017-06-01
To apply the equivalent uniform dose (EUD) radiobiological model to estimate the tumor control probability (TCP) scores for treatment plans using different radiobiological parameter settings, and to evaluate the correlation between TCP and physical quality indices of the treatment plans. Ten radiotherapy treatment plans for lung cancer were generated. The dose distributions were calculated using anisotropic analytical algorithm (AAA). Dose parameters and quality indices derived from dose volume histograms (DVH) for target volumes were evaluated. The predicted TCP was computed using EUD model with tissue-specific parameter (a=-10). The assumed radiobiological parameter setting for adjuvant therapy [tumor dose to control 50% of the tumor (TCD 50 ) =36.5 Gy and γ 50 =0.72] and curative intent (TCD 50 =51.24 Gy and γ 50 =0.83) were used. The bootstrap method was used to estimate the 95% confidence interval (95% CI). The coefficients (ρ) from Spearman's rank test were calculated to assess the correlation between quality indices with TCP. Wilcoxon paired test was used to calculate P value. The 95% CI of TCP were 70.6-81.5 and 46.6-64.7, respectively, for adjuvant radiotherapy and curative intent. The TCP outcome showed a positive and good correlation with calculated dose to 95% of the target volume (D95%) and minimum dose (Dmin). Consistently, TCP correlate negatively with heterogeneity indices. This study confirms that more relevant and robust radiobiological parameters setting should be integrated according to cancer type. The positive correlation with quality indices gives chance to improve the clinical out-come by optimizing the treatment plans to maximize the Dmin and D95%. This attempt to increase the TCP should be carried out with the respect of dose constraints for organs at risks. However, the negative correlation with heterogeneity indices shows that the optimization of beam arrangements could be also useful. Attention should be paid to obtain an appropriate optimization of initial plans, when comparing and ranking radiotherapy plans using TCP models, to avoid over or underestimated for TCP outcome.
Taghizadeh, Somayeh; Yang, Claus Chunli; R. Kanakamedala, Madhava; Morris, Bart; Vijayakumar, Srinivasan
2017-01-01
Purpose Magnetic resonance (MR) images are necessary for accurate contouring of intracranial targets, determination of gross target volume and evaluation of organs at risk during stereotactic radiosurgery (SRS) treatment planning procedures. Many centers use magnetic resonance imaging (MRI) simulators or regular diagnostic MRI machines for SRS treatment planning; while both types of machine require two stages of quality control (QC), both machine- and patient-specific, before use for SRS, no accepted guidelines for such QC currently exist. This article describes appropriate machine-specific QC procedures for SRS applications. Methods and materials We describe the adaptation of American College of Radiology (ACR)-recommended QC tests using an ACR MRI phantom for SRS treatment planning. In addition, commercial Quasar MRID3D and Quasar GRID3D phantoms were used to evaluate the effects of static magnetic field (B0) inhomogeneity, gradient nonlinearity, and a Leksell G frame (SRS frame) and its accessories on geometrical distortion in MR images. Results QC procedures found in-plane distortions (Maximum = 3.5 mm, Mean = 0.91 mm, Standard deviation = 0.67 mm, >2.5 mm (%) = 2) in X-direction (Maximum = 2.51 mm, Mean = 0.52 mm, Standard deviation = 0.39 mm, > 2.5 mm (%) = 0) and in Y-direction (Maximum = 13. 1 mm , Mean = 2.38 mm, Standard deviation = 2.45 mm, > 2.5 mm (%) = 34) in Z-direction and < 1 mm distortion at a head-sized region of interest. MR images acquired using a Leksell G frame and localization devices showed a mean absolute deviation of 2.3 mm from isocenter. The results of modified ACR tests were all within recommended limits, and baseline measurements have been defined for regular weekly QC tests. Conclusions With appropriate QC procedures in place, it is possible to routinely obtain clinically useful MR images suitable for SRS treatment planning purposes. MRI examination for SRS planning can benefit from the improved localization and planning possible with the superior image quality and soft tissue contrast achieved under optimal conditions. PMID:29487771
Fatemi, Ali; Taghizadeh, Somayeh; Yang, Claus Chunli; R Kanakamedala, Madhava; Morris, Bart; Vijayakumar, Srinivasan
2017-12-18
Purpose Magnetic resonance (MR) images are necessary for accurate contouring of intracranial targets, determination of gross target volume and evaluation of organs at risk during stereotactic radiosurgery (SRS) treatment planning procedures. Many centers use magnetic resonance imaging (MRI) simulators or regular diagnostic MRI machines for SRS treatment planning; while both types of machine require two stages of quality control (QC), both machine- and patient-specific, before use for SRS, no accepted guidelines for such QC currently exist. This article describes appropriate machine-specific QC procedures for SRS applications. Methods and materials We describe the adaptation of American College of Radiology (ACR)-recommended QC tests using an ACR MRI phantom for SRS treatment planning. In addition, commercial Quasar MRID 3D and Quasar GRID 3D phantoms were used to evaluate the effects of static magnetic field (B 0 ) inhomogeneity, gradient nonlinearity, and a Leksell G frame (SRS frame) and its accessories on geometrical distortion in MR images. Results QC procedures found in-plane distortions (Maximum = 3.5 mm, Mean = 0.91 mm, Standard deviation = 0.67 mm, >2.5 mm (%) = 2) in X-direction (Maximum = 2.51 mm, Mean = 0.52 mm, Standard deviation = 0.39 mm, > 2.5 mm (%) = 0) and in Y-direction (Maximum = 13. 1 mm , Mean = 2.38 mm, Standard deviation = 2.45 mm, > 2.5 mm (%) = 34) in Z-direction and < 1 mm distortion at a head-sized region of interest. MR images acquired using a Leksell G frame and localization devices showed a mean absolute deviation of 2.3 mm from isocenter. The results of modified ACR tests were all within recommended limits, and baseline measurements have been defined for regular weekly QC tests. Conclusions With appropriate QC procedures in place, it is possible to routinely obtain clinically useful MR images suitable for SRS treatment planning purposes. MRI examination for SRS planning can benefit from the improved localization and planning possible with the superior image quality and soft tissue contrast achieved under optimal conditions.
Co-streaming classes: a follow-up study in improving the user experience to better reach users.
Hayes, Barrie E; Handler, Lara J; Main, Lindsey R
2011-01-01
Co-streaming classes have enabled library staff to extend open classes to distance education students and other users. Student evaluations showed that the model could be improved. Two areas required attention: audio problems experienced by online participants and staff teaching methods. Staff tested equipment and adjusted software configuration to improve user experience. Staff training increased familiarity with specialized teaching techniques and troubleshooting procedures. Technology testing and staff training were completed, and best practices were developed and applied. Class evaluations indicate improvements in classroom experience. Future plans include expanding co-streaming to more classes and on-going data collection, evaluation, and improvement of classes.
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Astrophysics Data System (ADS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-08-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Technical Reports Server (NTRS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-01-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
Evaluation of PCR Systems for Field Screening of Bacillus anthracis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ozanich, Richard M.; Colburn, Heather A.; Victry, Kristin D.
There is little published data on the performance of hand-portable polymerase chain reaction (PCR) instruments that could be used by first responders to determine if a suspicious powder contains a potential biothreat agent. We evaluated five commercially available hand-portable PCR instruments for detection of Bacillus anthracis (Ba). We designed a cost-effective, statistically-based test plan that allows instruments to be evaluated at performance levels ranging from 0.85-0.95 lower confidence bound (LCB) on the probability of detection (POD) at confidence levels of 80-95%. We assessed specificity using purified genomic DNA from 13 Ba strains and 18 Bacillus near neighbors, interference with 22more » common hoax powders encountered in the field, and PCR inhibition when Ba spores were spiked into these powders. Our results indicated that three of the five instruments achieved >0.95 LCB on the POD with 95% confidence at test concentrations of 2,000 genome equivalents/mL (comparable to 2,000 spores/mL), displaying more than sufficient sensitivity for screening suspicious powders. These instruments exhibited no false positive results or PCR inhibition with common hoax powders, and reliably detected Ba spores spiked into common hoax powders, though some issues with instrument controls were observed. Our testing approach enables efficient instrument performance testing to a statistically rigorous and cost-effective test plan to generate performance data that will allow users to make informed decisions regarding the purchase and use of biodetection equipment in the field.« less
ERIC Educational Resources Information Center
Riegel, N. Blyth
Recent changes in the structure of curriculum and the instructional system in Texas have required a major reorganization of teaching, evaluating, budgeting, and planning activities in the local education agencies, which has created the need for a database. The history of Richardson Instructional Management System (RIMS), its data processing…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dameron, Arrelaine
During the duration of this CRADA, V-Glass and NREL will partner in testing, analysis, performance forecasting, costing, and evaluation of V-Glass’s GRIPWELD™ process technology for creating a low cost hermetic seal for conventional and vacuum glazing. Upon successful evaluation of hermeticity, V-Glass’s GRIPWELD™ will be evaluated for its potential use in highly insulating window glazing.
Current Effects of Army Materiel Command Operation Order 16 189 at TACOM LCMC
2017-05-25
Alexandria, VA: CNA Corporation. 78 Creswell, J. W. (2015). Educational Research: Planning, Conducting, and Evaluating Quantitative and Qualitative...research and development that relate to military requirements and test and evaluation . (d)(3) The Secretary shall establish or designate a single office or...for research. 4. Collect data. 5. Analyze and interpret the data. 42 6. Report and evaluate the research. Step 4 of the research process is
Testing and evaluation for astronaut extravehicular activity (EVA) operability.
Shields, N; King, L C
1998-09-01
Because it is the human component that defines space mission success, careful planning is required to ensure that hardware can be operated and maintained by crews on-orbit. Several methods exist to allow researchers and designers to better predict how hardware designs will behave under the harsh environment of low Earth orbit, and whether designs incorporate the necessary features for Extra Vehicular Activity (EVA) operability. Testing under conditions of simulated microgravity can occur during the design concept phase when verifying design operability, during mission training, or concurrently with on-orbit mission operations. The bulk of testing is focused on normal operations, but also includes evaluation of credible mission contingencies or "what would happen if" planning. The astronauts and cosmonauts who fly these space missions are well prepared and trained to survive and be productive in Earth's orbit. The engineers, designers, and training crews involved in space missions subject themselves to Earth based simulation techniques that also expose them to extreme environments. Aircraft falling ten thousand feet, alternating g-loads, underwater testing at 45 foot depth, enclosure in a vacuum chamber and subject to thermal extremes, each carries with it inherent risks to the humans preparing for space missions.
Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.
2001-07-01
The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less
Recent advances in materials toxicology
NASA Technical Reports Server (NTRS)
Russo, D. M.
1979-01-01
An overview of the fire toxicology program, its principal objectives and approach, is outlined. The laboratory methods of assessing pyrolysis product toxicity for two experiments are presented. The two experiments are: a comparison of test end points; and an evaluation of operant techniques. A third experiment is outlined for a comparison of full-scale and laboratory toxicity tests, with the purpose of determining animal survivability in full-scale tests. Future research plans are also outlined.
Launch Abort System Flight Test Overview
NASA Technical Reports Server (NTRS)
Williams-Hayes, Peggy; Bosworth, John T.
2007-01-01
This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.
Evaluation of a commercial automatic treatment planning system for prostate cancers.
Nawa, Kanabu; Haga, Akihiro; Nomoto, Akihiro; Sarmiento, Raniel A; Shiraishi, Kenshiro; Yamashita, Hideomi; Nakagawa, Keiichi
2017-01-01
Recent developments in Radiation Oncology treatment planning have led to the development of software packages that facilitate automated intensity-modulated radiation therapy (IMRT) and volumetric-modulated arc therapy (VMAT) planning. Such solutions include site-specific modules, plan library methods, and algorithm-based methods. In this study, the plan quality for prostate cancer generated by the Auto-Planning module of the Pinnacle 3 radiation therapy treatment planning system (v9.10, Fitchburg, WI) is retrospectively evaluated. The Auto-Planning module of Pinnacle 3 uses a progressive optimization algorithm. Twenty-three prostate cancer cases, which had previously been planned and treated without lymph node irradiation, were replanned using the Auto-Planning module. Dose distributions were statistically compared with those of manual planning by the paired t-test at 5% significance level. Auto-Planning was performed without any manual intervention. Planning target volume (PTV) dose and dose to rectum were comparable between Auto-Planning and manual planning. The former, however, significantly reduced the dose to the bladder and femurs. Regression analysis was performed to examine the correlation between volume overlap between bladder and PTV divided by the total bladder volume and resultant V70. The findings showed that manual planning typically exhibits a logistic way for dose constraint, whereas Auto-Planning shows a more linear tendency. By calculating the Akaike information criterion (AIC) to validate the statistical model, a reduction of interoperator variation in Auto-Planning was shown. We showed that, for prostate cancer, the Auto-Planning module provided plans that are better than or comparable with those of manual planning. By comparing our results with those previously reported for head and neck cancer treatment, we recommend the homogeneous plan quality generated by the Auto-Planning module, which exhibits less dependence on anatomic complexity. Copyright © 2017 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Methods and benefits of experimental seismic evaluation of nuclear power plants. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-07-01
This study reviews experimental techniques, instrumentation requirements, safety considerations, and benefits of performing vibration tests on nuclear power plant containments and internal components. The emphasis is on testing to improve seismic structural models. Techniques for identification of resonant frequencies, damping, and mode shapes, are discussed. The benefits of testing with regard to increased damping and more accurate computer models are oulined. A test plan, schedule and budget are presented for a typical PWR nuclear power plant.
In-Space Transportation with Tethers
NASA Technical Reports Server (NTRS)
Lorenzini, Enrico; Estes, Robert D.; Cosmo, Mario L.
1998-01-01
The annual report covers the research conducted on the following topics related to the use of spaceborne tethers for in-space transportation: ProSEDS tether modeling (current collection analyses, influence of a varying tether temperature); proSEDS mission analysis and system dynamics (tether thermal model, thermo-electro-dynamics integrated simulations); proSEDS-tether development and testing (tether requirements, deployment test plan, tether properties testing, deployment tests); and tethers for reboosting the space-based laser (mission analysis, tether system preliminary design, evaluation of attitude constraints).
Dückers, Michel L A; Thormar, Sigridur B; Juen, Barbara; Ajdukovic, Dean; Newlove-Eriksson, Lindy; Olff, Miranda
2018-01-01
Disasters can have an enormous impact on the health and well-being of those affected. Internationally, governments and service providers are often challenged to address complex psychosocial problems. Ideally, the potentially broad range of support activities include a coherent, high-quality mental health and psychosocial support (MHPSS) programme. We present a theory-driven quantitative analysis of the quality of 40 MHPSS programmes, mostly implemented in European disaster settings. The objective is to measure quality domains recognized as relevant in the literature and to empirically test associations. During the EU project "Operationalizing Psychosocial Support in Crisis" (OPSIC) an evaluation survey was designed and developed for this purpose and completed by 40 MHPSS programme coordinators involved in different mass emergencies and disasters. We analysed the survey data in two steps. Firstly, we used the data to operationalize quality domains of a MHPSS programme, tested constructs and assessed their internal consistency reliability. A total of 26 out of 44 survey items clustered into three of the four domains identified within the theoretical framework: "planning and delivery system" (Cronbach's alpha 0.82); "general evaluation criteria" (Cronbach's alpha 0.82); and "essential psychosocial principles" (Cronbach's alpha 0.75). "Measures and interventions applied", theoretically a potential fourth domain, could not be confirmed to empirically cluster together. Secondly, several models with associations between domains and measures and interventions were tested and compared. The model with the best fit suggests that in MHPSS programmes with a higher planning and delivery systems score, a larger number of measures and interventions from evidence-informed guidelines are applied. In such programmes, coordinators are more positive about general evaluation criteria and the realization of essential psychosocial principles. Moreover, the analyses showed that some measures and interventions are more likely to be applied in programmes with more evolved planning and delivery systems, yet for most measures and interventions the likelihood of being applied is not linked to planning and delivery system status, nor to coordinator perceptions concerning psychosocial principles and evaluation criteria. Further research is necessary to validate and expand the findings and to learn more about success factors and obstacles for MHPSS programme implementation.
Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2008-09-01
This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating amore » much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health« less
Specht, Lena
2007-07-01
2-[18F]fluoro-2-deoxyglucose positron-emission tomography (FDG-PET) is used increasingly in the clinical management of lymphomas. With regard to staging, FDG-PET is more sensitive and specific than conventional staging methods in FDG avid lymphomas (ie, Hodgkin lymphoma and most aggressive non-Hodgkin lymphomas). Despite methodological problems, in particular the lack of a valid reference test, FDG-PET is approved and generally used for this purpose. With regard to response evaluation, FDG-PET at the end of treatment seems to aid considerably in differentiating between residual masses with or without residual lymphoma. Hence, new revised response criteria have been proposed, incorporating the result of FDG-PET at the end of treatment. An early interim FDG-PET scan after 1 to 3 cycles of chemotherapy is a very strong predictor of outcome, and trials are now in progress testing treatment modifications on this basis. With regard to treatment planning, in the context of combined-modality therapy, radiotherapy for lymphomas is moving toward more conformal techniques reducing the irradiated volume to include only the macroscopic lymphoma. In this situation, accurate imaging is essential, and FDG-PET coregistered with the planning computed tomography (CT) scan is used increasingly. The availability of PET/CT scanners suited for virtual simulation has aided this process. However, clinical data evaluating this technique are at present sparse.
Chen, Peng; Zhang, Jiquan; Sun, Yingyue; Liu, Xiaojing
2016-01-01
Urban waterlogging seriously threatens the safety of urban residents and properties. Wargame simulation research on resident emergency evacuation from waterlogged areas can determine the effectiveness of emergency response plans for high risk events at low cost. Based on wargame theory and emergency evacuation plans, we used a wargame exercise method, incorporating qualitative and quantitative aspects, to build an urban waterlogging disaster emergency shelter using a wargame exercise and evaluation model. The simulation was empirically tested in Daoli District of Harbin. The results showed that the wargame simulation scored 96.40 points, evaluated as good. From the simulation results, wargame simulation of urban waterlogging emergency procedures for disaster response can improve the flexibility and capacity for command, management and decision-making in emergency management departments. PMID:28009805
Schiff, Gordon D; Reyes Nieva, Harry; Griswold, Paula; Leydon, Nicholas; Ling, Judy; Federico, Frank; Keohane, Carol; Ellis, Bonnie R; Foskett, Cathy; Orav, E John; Yoon, Catherine; Goldmann, Don; Weissman, Joel S; Bates, David W; Biondolillo, Madeleine; Singer, Sara J
2017-08-01
Evaluate application of quality improvement approaches to key ambulatory malpractice risk and safety areas. In total, 25 small-to-medium-sized primary care practices (16 intervention; 9 control) in Massachusetts. Controlled trial of a 15-month intervention including exposure to a learning network, webinars, face-to-face meetings, and coaching by improvement advisors targeting "3+1" high-risk domains: test result, referral, and medication management plus culture/communication issues evaluated by survey and chart review tools. Chart reviews conducted at baseline and postintervention for intervention sites. Staff and patient survey data collected at baseline and postintervention for intervention and control sites. Chart reviews demonstrated significant improvements in documentation of abnormal results, patient notification, documentation of an action or treatment plan, and evidence of a completed plan (all P<0.001). Mean days between laboratory test date and evidence of completed action/treatment plan decreased by 19.4 days (P<0.001). Staff surveys showed modest but nonsignificant improvement for intervention practices relative to controls overall and for the 3 high-risk domains that were the focus of PROMISES. A consortium of stakeholders, quality improvement tools, coaches, and learning network decreased selected ambulatory safety risks often seen in malpractice claims.
NASA Technical Reports Server (NTRS)
Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas
2017-01-01
This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.
NASA Technical Reports Server (NTRS)
Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas
2016-01-01
This presentation accompanies the paper titled Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory. NASA is evaluating whether PSL, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This presentation (and accompanying paper) presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.
Biomass power for rural development. Technical progress report, January 1--March 31, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.
2016-06-01
an effective system monitoring and display capability. The SOM, C-SSE, and resource managers access MUOS via a web portal called the MUOS Planning...and Provisioning Application (PlanProvApp). This web portal is their window into MUOS and is designed to provide them with a shared understanding of...including page loading errors, partially loaded web pages, incomplete reports, and inaccurate reports. For example, MUOS reported that there were
Kerry, Matthew J.; Embretson, Susan E.
2018-01-01
Future time perspective (FTP) is defined as “perceptions of the future as being limited or open-ended” (Lang and Carstensen, 2002; p. 125). The construct figures prominently in both workplace and retirement domains, but the age-predictions are competing: Workplace research predicts decreasing FTP age-change, in contrast, retirement scholars predict increasing FTP age-change. For the first time, these competing predictions are pitted in an experimental manipulation of subjective life expectancy (SLE). A sample of N = 207 older adults (age 45–60) working full-time (>30-h/week) were randomly assigned to SLE questions framed as either ‘Live-to’ or ‘Die-by’ to evaluate competing predictions for FTP. Results indicate general support for decreasing age-change in FTP, indicated by independent-sample t-tests showing lower FTP in the ‘Die-by’ framing condition. Further general-linear model analyses were conducted to test for interaction effects of retirement planning with experimental framings on FTP and intended retirement; While retirement planning buffered FTP’s decrease, simple-effects also revealed that retirement planning increased intentions for sooner retirement, but lack of planning increased intentions for later retirement. Discussion centers on practical implications of our findings and consequences validity evidence in future empirical research of FTP in both workplace and retirement domains. PMID:29375435
Simulation and Flight Test Capability for Testing Prototype Sense and Avoid System Elements
NASA Technical Reports Server (NTRS)
Howell, Charles T.; Stock, Todd M.; Verstynen, Harry A.; Wehner, Paul J.
2012-01-01
NASA Langley Research Center (LaRC) and The MITRE Corporation (MITRE) have developed, and successfully demonstrated, an integrated simulation-to-flight capability for evaluating sense and avoid (SAA) system elements. This integrated capability consists of a MITRE developed fast-time computer simulation for evaluating SAA algorithms, and a NASA LaRC surrogate unmanned aircraft system (UAS) equipped to support hardware and software in-the-loop evaluation of SAA system elements (e.g., algorithms, sensors, architecture, communications, autonomous systems), concepts, and procedures. The fast-time computer simulation subjects algorithms to simulated flight encounters/ conditions and generates a fitness report that records strengths, weaknesses, and overall performance. Reviewed algorithms (and their fitness report) are then transferred to NASA LaRC where additional (joint) airworthiness evaluations are performed on the candidate SAA system-element configurations, concepts, and/or procedures of interest; software and hardware components are integrated into the Surrogate UAS research systems; and flight safety and mission planning activities are completed. Onboard the Surrogate UAS, candidate SAA system element configurations, concepts, and/or procedures are subjected to flight evaluations and in-flight performance is monitored. The Surrogate UAS, which can be controlled remotely via generic Ground Station uplink or automatically via onboard systems, operates with a NASA Safety Pilot/Pilot in Command onboard to permit safe operations in mixed airspace with manned aircraft. An end-to-end demonstration of a typical application of the capability was performed in non-exclusionary airspace in October 2011; additional research, development, flight testing, and evaluation efforts using this integrated capability are planned throughout fiscal year 2012 and 2013.
Kabami, Jane; Chamie, Gabriel; Kwarisiima, Dalsone; Biira, Edith; Ssebutinde, Peter; Petersen, Maya; Charlebois, Edwin D.; Kamya, Moses R.; Havlir, Diane V.; Clark, Tamara D.
2017-01-01
Abstract Introduction: Multi-disease community health campaigns can be effective for population-wide HIV testing in a research setting (SEARCH: NCT01864603). We sought to evaluate feasibility and uptake of a community-led health campaign (CLHC) planned and implemented by village leaders and local clinic workers in Uganda. Methods: Over five months in 2014, locally elected village leaders and Ministry of Health (MoH) clinic staff in a rural parish in Uganda planned a census followed by a CLHC, after training by two SEARCH trial consultants and by leaders from a neighbouring parish that had previously participated in a SEARCH health campaign. We defined feasibility as: (1) elected leaders’ participation in training and implementation of pre-campaign census and mobilization activities; (2) implementation of all campaign activities by MoH-funded, local clinic staff; and (3) community participation in the campaign, including point-of-care screening for HIV, malaria, hypertension and diabetes, and same-day referral for male circumcision and family planning (FP). Costing of all salaries and supplies was conducted. Results: Elected leaders from all eight villages in the parish participated in CLHC training. They and local clinic staff met monthly to select and plan CLHC services. Village leaders then leveraged existing volunteer health teams to perform a door-to-door census, enumerating 5,202 parish residents over 2 weeks. 2,753 (53%) residents participated in the 6-day CLHC. Of 1,584 adult participants, 1,474 (93%) tested for HIV: 105/1,474 (7.1%) tested HIV positive. 27% (751/2,753) of participants reported fever and underwent malaria rapid diagnostic testing: 5.3% (40/751) tested positive. Among adults screened, 19% (271/1,452) were hypertensive, and 3% (18/637) had a random blood sugar >11.1 mmol/L. Of 805 men and boys (>10 years), 91 (11%) accepted same-day clinic referral and underwent medical circumcision. Of 900 women offered same-day long-term FP referrals, 25 accepted. The CLHC cost, including census, mobilization and testing services, was $23,597 ($8.57/participant). Conclusions: Elected village leaders successfully planned and conducted a 6-day multi-disease health campaign with service provision by local clinic staff that reached over half of a rural Ugandan community. These data suggest it is feasible for local leaders and clinics to adopt a multi-disease health campaign approach to scale-up HIV testing in rural Africa. PMID:28406269
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maurer, J; Sintay, B; Manning, M
Purpose: This study evaluates a novel algorithm that can be used with any treatment planning system for simple and rapid generation of stereotactic radiosurgery (SRS) plans for treating multiple brain metastases using a single isocenter dynamic conformal arc (DCA) approach. This technique is compared with a single isocenter volumetric modulated arc therapy (VMAT) technique in terms of delivery time, conformity, low dose spread and delivery accuracy. Methods: Five patients, with a total of 37 (5 – 11) targets were planned using a previously published method for generating optimal VMAT plans and using the proposed DCA algorithm. All planning target volumesmore » (PTVs) were planned to 20 Gy, meeting a minimum 99% coverage and maximum 135 % hot spot for both techniques. Quality assurance was performed using radiochromic film, with films placed in the high dose regions of each PTV. Normal tissue volumes receiving 12 Gy and 6 Gy (V12 and V6) were computed for each plan. Conformity index (CI) and gamma evaluations (95% of points passing 4%/0.5mm) were computed for each PTV. Results: Delivery times, including beam on and table rotation times, were comparable: 17 – 22 minutes for all deliveries. V12s for DCA plans were (18.5±15.2 cc) vs. VMAT (19.7±14.4 cc). V6s were significantly lower for DCA (69.0±52.0 cc) compared with VMAT (154.0±91.0 cc) (p <<0.05). CIs for VMAT targets were (1.38±0.50) vs. DCA (1.61±0.41). 36 of 37 DCA planned targets passed gamma tests, while 29 of 37 VMAT planned targets passed. Conclusion: Single isocenter DCA plans were easily achieved. The evaluation suggests that DCA may represent a favorable technique compared with VMAT for multiple target SRS by reducing dose to normal tissue and more accurately depicting deliverable dose.« less
DOT National Transportation Integrated Search
2001-01-01
Internet-based Advanced Traveler Information Services (ATIS) provide the urban traveler with estimated travel times based on current roadway congestion. Survey research indicates that the vast majority of current ATIS users are satisfied consumers wh...
DOT National Transportation Integrated Search
1999-07-01
This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...
San Francisco urban partnership agreement, national evaluation : telecommuting/TDM data test plan.
DOT National Transportation Integrated Search
2002-04-01
The Standards Requirements Document (SRD) collects information from the other National ITS Architecture program documents and reorganizes it in a manner intended to support the development of critical ITS standards. The key results in the SRD a...
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
DOT National Transportation Integrated Search
1997-09-01
The United States Department of Transportations (USDOTs) National ITS Program : Plan describes the national strategy for deploying advanced technologies and services into our : transportation system. To emphasize the need-driven (rather than te...
DOT National Transportation Integrated Search
1997-10-01
With the growing reliance on information systems within the global economy, it has become necessary to protect the availability, integrity, and confidentiality of information. As the surface transportation industry enters the information era through ...
DOT National Transportation Integrated Search
1998-07-01
The Rural Public Transportation Technologies: User Needs and Applications study was conducted as part of the U.S. Department of Transportations (DOT) overall Rural Intelligent Transportation System (ITS) Program. The study examined the opportuniti...
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1995-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
Experimental Evaluation of a Planning Language Suitable for Formal Verification
NASA Technical Reports Server (NTRS)
Butler, Rick W.; Munoz, Cesar A.; Siminiceanu, Radu I.
2008-01-01
The marriage of model checking and planning faces two seemingly diverging alternatives: the need for a planning language expressive enough to capture the complexity of real-life applications, as opposed to a language simple, yet robust enough to be amenable to exhaustive verification and validation techniques. In an attempt to reconcile these differences, we have designed an abstract plan description language, ANMLite, inspired from the Action Notation Modeling Language (ANML) [17]. We present the basic concepts of the ANMLite language as well as an automatic translator from ANMLite to the model checker SAL (Symbolic Analysis Laboratory) [7]. We discuss various aspects of specifying a plan in terms of constraints and explore the implications of choosing a robust logic behind the specification of constraints, rather than simply propose a new planning language. Additionally, we provide an initial assessment of the efficiency of model checking to search for solutions of planning problems. To this end, we design a basic test benchmark and study the scalability of the generated SAL models in terms of plan complexity.
Merna, Catherine; Rwigema, Jean-Claude M; Cao, Minsong; Wang, Pin-Chieh; Kishan, Amar U; Michailian, Argin; Lamb, James; Sheng, Ke; Agazaryan, Nzhde; Low, Daniel A; Kupelian, Patrick; Steinberg, Michael L; Lee, Percy
2016-01-01
We evaluated the feasibility of planning stereotactic body radiotherapy (SBRT) for large central early-stage non-small cell lung cancer with a tri-cobalt-60 (tri-(60)Co) system equipped with real-time magnetic resonance imaging (MRI) guidance, as compared to linear accelerator (LINAC)-based SBRT. In all, 20 patients with large central early-stage non-small cell lung cancer who were treated between 2010 and 2015 with LINAC-based SBRT were replanned using a tri-(60)Co system for a prescription dose of 50Gy in 4 fractions. Doses to organs at risk were evaluated based on established MD Anderson constraints for central lung SBRT. R100 values were calculated as the total tissue volume receiving 100% of the dose (V100) divided by the planning target volume and compared to assess dose conformity. Dosimetric comparisons between LINAC-based and tri-(60)Co SBRT plans were performed using Student׳s t-test and Wilcoxon Ranks test. Blinded reviews by radiation oncologists were performed to assess the suitability of both plans for clinical delivery. The mean planning target volume was 48.3cc (range: 12.1 to 139.4cc). Of the tri-(60)Co SBRT plans, a mean 97.4% of dosimetric parameters per patient met MD Anderson dose constraints, whereas a mean 98.8% of dosimetric parameters per patient were met with LINAC-based SBRT planning (p = 0.056). R100 values were similar between both plans (1.20 vs 1.21, p = 0.79). Upon blinded review by 4 radiation oncologists, an average of 90% of the tri-(60)Co SBRT plans were considered acceptable for clinical delivery compared with 100% of the corresponding LINAC-based SBRT plans (p = 0.17). SBRT planning using the tri-(60)Co system with built-in MRI is feasible and achieves clinically acceptable plans for most central lung patients, with similar target dose conformity and organ at risk dosimetry. The added benefit of real-time MRI-guided therapy may further optimize tumor targeting while improving normal tissue sparing, which warrants further investigation in a prospective feasibility clinical trial. Copyright © 2016 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Merna, Catherine; Rwigema, Jean-Claude M.; Cao, Minsong
We evaluated the feasibility of planning stereotactic body radiotherapy (SBRT) for large central early-stage non−small cell lung cancer with a tri-cobalt-60 (tri-{sup 60}Co) system equipped with real-time magnetic resonance imaging (MRI) guidance, as compared to linear accelerator (LINAC)–based SBRT. In all, 20 patients with large central early-stage non−small cell lung cancer who were treated between 2010 and 2015 with LINAC-based SBRT were replanned using a tri-{sup 60}Co system for a prescription dose of 50 Gy in 4 fractions. Doses to organs at risk were evaluated based on established MD Anderson constraints for central lung SBRT. R{sub 100} values were calculatedmore » as the total tissue volume receiving 100% of the dose (V{sub 100}) divided by the planning target volume and compared to assess dose conformity. Dosimetric comparisons between LINAC-based and tri-{sup 60}Co SBRT plans were performed using Student's t-test and Wilcoxon Ranks test. Blinded reviews by radiation oncologists were performed to assess the suitability of both plans for clinical delivery. The mean planning target volume was 48.3 cc (range: 12.1 to 139.4 cc). Of the tri-{sup 60}Co SBRT plans, a mean 97.4% of dosimetric parameters per patient met MD Anderson dose constraints, whereas a mean 98.8% of dosimetric parameters per patient were met with LINAC-based SBRT planning (p = 0.056). R{sub 100} values were similar between both plans (1.20 vs 1.21, p = 0.79). Upon blinded review by 4 radiation oncologists, an average of 90% of the tri-{sup 60}Co SBRT plans were considered acceptable for clinical delivery compared with 100% of the corresponding LINAC-based SBRT plans (p = 0.17). SBRT planning using the tri-{sup 60}Co system with built-in MRI is feasible and achieves clinically acceptable plans for most central lung patients, with similar target dose conformity and organ at risk dosimetry. The added benefit of real-time MRI-guided therapy may further optimize tumor targeting while improving normal tissue sparing, which warrants further investigation in a prospective feasibility clinical trial.« less
Antibiotics Are the Most Commonly Identified Cause of Perioperative Hypersensitivity Reactions.
Kuhlen, James L; Camargo, Carlos A; Balekian, Diana S; Blumenthal, Kimberly G; Guyer, Autumn; Morris, Theresa; Long, Aidan; Banerji, Aleena
2016-01-01
Hypersensitivity reactions (HSRs) during the perioperative period are unpredictable and can be life threatening. Prospective studies for the evaluation of perioperative HSRs are lacking, and data on causative agents vary between different studies. The objective of this study was to prospectively determine the success of a comprehensive allergy evaluation plan for patients with HSRs during anesthesia, including identification of a causative agent and outcomes during subsequent anesthesia exposure. All patients referred for a perioperative HSR between November 2013 and March 2015, from a Boston teaching hospital, were evaluated using a standardized protocol with skin testing (ST) within 6 months of HSR. Comprehensive allergy evaluation included collection of patient information, including characteristics of HSR during anesthesia. We reviewed the results of ST and/or test doses for all potential causative medications Event-related tryptase levels were reviewed when available. Over 17 months, 25 patients completed the comprehensive allergy evaluation. Fifty-two percent (13 of 25) were female with a median age of 52 (interquartile range 43-66) years. The most frequently observed HSR systems were cutaneous (68%), cardiovascular (64%), and pulmonary (24%). A culprit drug, defined as a positive ST, was identified in 36% (9 of 25) of patients. The most common agent identified was cefazolin (6 of 9). After our comprehensive evaluation and management plan, 7 (7 of 8, 88%) patients tolerated subsequent anesthesia. Cefazolin was the most commonly identified cause of a perioperative HSR in our study population. Skin testing patients within 6 months of a perioperative HSR may improve the odds of finding a positive result. Tolerance of subsequent anesthesia is generally achieved in patients undergoing our comprehensive evaluation. Copyright © 2016 American Academy of Allergy, Asthma & Immunology. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Pass, Ralph P.
1988-01-01
Recently, the United States has increased its activities related to aircraft icing in numerous fields: ice phobics, revised characterization of icing conditions, instrument development/evaluation, de-ice/anti-ice devices, simulated supercooled clouds, computer simulation and flight tests. The Federal Coordinator for Meteorology is involved in two efforts, one a National Plan on Aircraft Icing and the other a plan for Improved Aircraft Icing Forecasts and Associated Warning Services. These two plans will provide an approved structure for future U.S. activities related to aircraft icing. The recommended activities will significantly improve the position of government agencies to perform mandated activities and to enable U.S. manufacturers to be competitive in the world market.
Halloran, J P; Ross, M W; Huffman, L
1996-01-01
Social and political pressure, as well as public health theory, mandate inclusion of PLWHIV in community planning and policy development processes. Barriers to PLWHIV participation may be cognitive, instrumental, and/or affective. The authors report on development, implementation, and initial evaluation of a pilot project testing a psychoeducational intervention to increase organizational participation by people with HIV. Organizational participation by individual increased from a mean of 0.5 organizations at entry to 2.3 at follow-up. Evaluation data indicate that increases in self-esteem, self-confidence, and specific knowledge, along with demystification of organizational operations, networking, and modeling by project staff contributed to the outcome.
Pandemic influenza preparedness in Latin America: analysis of national strategic plans.
Mensua, Ana; Mounier-Jack, Sandra; Coker, Richard
2009-07-01
The threat of a human pandemic of influenza has prompted the development of national influenza pandemic preparedness plans over the last 4 years. Analyses have been carried out to assess preparedness in Europe, Asia and Africa. We assessed plans to evaluate the national strategic pandemic influenza preparedness in the countries of Latin America. Published national pandemic influenza preparedness plans from Latin American countries were evaluated against criteria drawn from the World Health Organization checklist. Plans were eligible for inclusion if formally published before 16 November 2007. Fifteen national plans were identified and retrieved from the 17 Latin American countries surveyed. Latin American countries demonstrated different degrees of preparedness, and that a high level of completeness of plans was correlated to a country's wealth to a certain extent. Plans were judged strong in addressing surveillance requirements, and provided appropriate communication strategies directed to the general public and health care personnel. However, gaps remained, including the organization of health care services' response; planning and maintenance of essential services; and the provision of containment measures such as the stockpiling of necessary medical supplies including vaccines and antiviral medications. In addition, some inconsistencies and variations which may be important, such as in border control measures and the capacity to contain outbreaks, exist between country plans-issues that could result in confusion in the event of a pandemic. A number of plans remain developmental in nature and, as elsewhere, more emphasis should be placed on strengthening the operability of plans, and in testing them. Whilst taking account of resources constraints, plans should be further developed in a coherent manner with both regional and international imperatives.
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
NASA Technical Reports Server (NTRS)
1971-01-01
Preliminary design and analysis of purge system concepts and purge subsystem approaches are defined and evaluated. Acceptable purge subsystem approaches were combined into four predesign layouts which are presented for comparison and evaluation. Two predesigns were selected for further detailed design and evaluation for eventual selection of the best design for a full scale test configuration. An operation plan is included as an appendix for reference to shuttle-oriented operational parameters.
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1992-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
International testing of a Mars rover prototype
NASA Astrophysics Data System (ADS)
Kemurjian, Alexsandr Leonovich; Linkin, V.; Friedman, L.
1993-03-01
Tests on a prototype engineering model of the Russian Mars 96 Rover were conducted by an international team in and near Death Valley in the United States in late May, 1992. These tests were part of a comprehensive design and testing program initiated by the three Russian groups responsible for the rover development. The specific objectives of the May tests were: (1) evaluate rover performance over different Mars-like terrains; (2) evaluate state-of-the-art teleoperation and autonomy development for Mars rover command, control and navigation; and (3) organize an international team to contribute expertise and capability on the rover development for the flight project. The range and performance that can be planned for the Mars mission is dependent on the degree of autonomy that will be possible to implement on the mission. Current plans are for limited autonomy, with Earth-based teleoperation for the nominal navigation system. Several types of television systems are being investigated for inclusion in the navigation system including panoramic camera, stereo, and framing cameras. The tests used each of these in teleoperation experiments. Experiments were included to consider use of such TV data in autonomy algorithms. Image processing and some aspects of closed-loop control software were also tested. A micro-rover was tested to help consider the value of such a device as a payload supplement to the main rover. The concept is for the micro-rover to serve like a mobile hand, with its own sensors including a television camera.
Joint Test and Evaluation Procedures Manual.
1980-09-01
offices within 0oD such as ODDTE may allot funds to individual JTFs for purchasing goods and services. 1-12 Service support to JT&E is usually drawn...on underlying assumptions about the "real world," and that a good operational scenario may conflict with the assumptions for a specific statistical...Learned Since a good Data Management Plan is critical to the success of a joint test, some situations which have occurred in previous tests are listed
Evaluation of Carpet Steam and Heat Cleaners as Biological Sampling Devices
2016-05-01
to develop this approach into a valuable, readily available sampling capability and to evaluate its applicability for decontamination . 15. SUBJECT...Center, Research Triangle Park, NC) for their critical review of the test plan and the final report; and Debbie Sheppard (U.S. Army Edgewood Chemical ...established to further examine and enhance the capabilities for sampling, decontaminating , and clearing biologically contaminated areas, including the
1982-09-30
not changed because they are not subject to a careful evaluation. The solution The four job aids contained in this manual provide specific techniques...lesson plans tions. " training design, or * testing NOTICE This manual has been developed using the standards of the Information MappingO writing service...Information Mapping, Inc. S NOTICE This manual has been developed using the standards of the Information MappingS writing service. Infornation Mapping