Hazardous Waste Certification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-01
The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance frommore » the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22.« less
A multi-echelon supply chain model for municipal solid waste management system.
Zhang, Yimei; Huang, Guo He; He, Li
2014-02-01
In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well. Copyright © 2013 Elsevier Ltd. All rights reserved.
A multi-echelon supply chain model for municipal solid waste management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Yimei, E-mail: yimei.zhang1@gmail.com; Huang, Guo He; He, Li
2014-02-15
In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions ofmore » the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.« less
2014 Zero Waste Strategic Plan Executive Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wrons, Ralph J.
Sandia National Laboratories/New Mexico is located in Albuquerque, New Mexico, primarily on Department of Energy (DOE) permitted land on approximately 2,800 acres of Kirtland Air Force Base. There are approximately 5.5 million square feet of buildings, with a workforce of approximately 9200 personnel. Sandia National Laboratories Materials Sustainability and Pollution Prevention (MSP2) program adopted in 2008 an internal team goal for New Mexico site operations for Zero Waste to Landfill by 2025. Sandia solicited a consultant to assist in the development of a Zero Waste Strategic Plan. The Zero Waste Consultant Team selected is a partnership of SBM Management Servicesmore » and Gary Liss & Associates. The scope of this Plan is non-hazardous solid waste and covers the life cycle of material purchases to the use and final disposal of the items at the end of their life cycle.« less
NASA Technical Reports Server (NTRS)
Rice, E. E.; Miller, N. E.; Yates, K. R.; Martin, W. E.; Friedlander, A. L.
1980-01-01
The objectives, approach, assumptions, and limitations of a study of nuclear waste disposal in space are discussed with emphasis on the following: (1) payload characterization; (2) safety assessment; (3) health effects assessment; (4) long-term risk assessment; and (5) program planning support to NASA and DOE. Conclusions are presented for each task.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vugrin, K.W.; Twitchell, Ch.A.
2008-07-01
Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less
An inexact reverse logistics model for municipal solid waste management systems.
Zhang, Yi Mei; Huang, Guo He; He, Li
2011-03-01
This paper proposed an inexact reverse logistics model for municipal solid waste management systems (IRWM). Waste managers, suppliers, industries and distributors were involved in strategic planning and operational execution through reverse logistics management. All the parameters were assumed to be intervals to quantify the uncertainties in the optimization process and solutions in IRWM. To solve this model, a piecewise interval programming was developed to deal with Min-Min functions in both objectives and constraints. The application of the model was illustrated through a classical municipal solid waste management case. With different cost parameters for landfill and the WTE, two scenarios were analyzed. The IRWM could reflect the dynamic and uncertain characteristics of MSW management systems, and could facilitate the generation of desired management plans. The model could be further advanced through incorporating methods of stochastic or fuzzy parameters into its framework. Design of multi-waste, multi-echelon, multi-uncertainty reverse logistics model for waste management network would also be preferred. Copyright © 2010 Elsevier Ltd. All rights reserved.
Cooperative mission execution and planning
NASA Astrophysics Data System (ADS)
Flann, Nicholas S.; Saunders, Kevin S.; Pells, Larry
1998-08-01
Utilizing multiple cooperating autonomous vehicles to perform tasks enhances robustness and efficiency over the use of a single vehicle. Furthermore, because autonomous vehicles can be controlled precisely and their status known accurately in real time, new types of cooperative behaviors are possible. This paper presents a working system called MEPS that plans and executes missions for multiple autonomous vehicles in large structured environments. Two generic spatial tasks are supported, to sweep an area and to visit a location while activating on-board equipment. Tasks can be entered both initially by the user and dynamically during mission execution by both users and vehicles. Sensor data and task achievement data is shared among the vehicles enabling them to cooperatively adapt to changing environmental, vehicle and tasks conditions. The system has been successfully applied to control ATV and micro-robotic vehicles in precision agriculture and waste-site characterization environments.
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Quarterly report for the NGA FFCA project, July 1--September 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-31
Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributedmore » for review and comment.« less
78 FR 46549 - Approval and Promulgation of Implementation Plans; Idaho: State Board Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... such board or body or the head of an executive agency with similar powers be adequately disclosed.'' 42... Requirements Idaho Code Sec. 39-107, Board--Composition--Officers-- Compensation--Powers--Subpoena--Depositions... regard to their knowledge of and interest in solid waste; two (2) members shall be chosen for their...
Feasibility of Space Disposal of Radioactive Nuclear Waste. 1: Executive Summary
NASA Technical Reports Server (NTRS)
1973-01-01
This NASA study, performed at the request of the AEC, concludes that transporting radioactive waste (primarily long-lived isotopes) into space is feasible. Tentative solutions are presented for technical problems involving safe packaging. Launch systems (existing and planned), trajectories, potential hazards, and various destinations were evaluated. Solar system escape is possible and would have the advantage of ultimate removal of the radioactive waste from man's environment. Transportation costs would be low (comparable to less than a 5 percent increase in the cost of electricity) even though more than 100 space shuttle launches per year would be required by the year 2000.
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
BPA’s Sustainability Action Plan is grounded in our commitment to environmental stewardship and Executive Order 13514 that calls on the federal agencies to “lead by example” by setting a 2020 greenhouse gas emissions target, increasing energy efficiency; reducing fleet petroleum consumption; conserving water; reducing waste; supporting sustainable communities; and leveraging federal purchasing power to promoting environmentally responsible products and technologies.
EPA currently requires that application of Concentrated Animal Feeding Operation (CAFO) wastes to agricultural fields follows a Comprehensive Nutrient Management Plan (CNMP). The tacit assumption is that a well designed and executed CNMP ensures that all lagoon water contaminants...
Working Together for a Healthy Environment: A Guide for Multi-Cultural Community Groups
ERIC Educational Resources Information Center
US Environmental Protection Agency, 2007
2007-01-01
As a community-based organization, community leader or activist, individuals are in a unique position to take the lead in raising awareness about resource conservation, good solid waste management, and safeguarding the environment for future generations. This paper is designed to help individuals plan and execute community events that promote the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Jacobs, Raymer J.E.
2008-06-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Subramanian, Karthik H.; Thien, Michael G.; Wellman, Dawn M.
The National Laboratories are a critical partner and provide expertise in numerous aspects of the successful execution of the Direct-Feed Low Activity Waste Program. The National Laboratories are maturing the technologies of the Low-Activity Waste Pre-Treatment System (LAWPS) consistent with DOE Order 413.3B “Program and Project Management for the Acquisition of Capital Assets” expectations. The National Laboratories continue to mature waste forms, i.e. glass and secondary waste grout, for formulations and predictions of long-term performance as inputs to performance assessments. The working processes with the National Laboratories have been developed in procurements, communications, and reporting to support the necessary delivery-basedmore » technology support. The relationship continues to evolve from planning and technology development to support of ongoing operations and integration of multiple highly coordinated facilities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-23
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
Installation Restoration Program. Phase 1: Records Search, Sheppard AFB, Texas
1984-02-01
Environmental Response, Compensation, and Liability Act (CIERA) of 1980, by Executive Order 12316, and 40 Ci 300 Subpart F (National Contingency Plan). CCLA...hensive Environmental Response, Compensation, and Liability Act of 1980 (CURCLA). A potentially hazardous waste is one which is suspected of being...site for agricultural purposes to prevent food chain contamination. Silvicultural use Restrict the use of the site for silvi- cultural uses (root
RESULTS OF THE ENVIRONMENTAL MANAGEMENT (EM) CORPORATE PROJECT TEAM DISPOSING WASTE & REDUCING RISK
DOE Office of Scientific and Technical Information (OSTI.GOV)
SHRADER, T.A.; KNERR, R.
2005-01-31
In 2002, the US Department of Energy's (DOE) Office of Environmental Management (EM) released the Top-To-Bottom Review of cognizant clean-up activities around the DOE Complex. The review contained a number of recommendations for changing the way EM operates in order to reduce environmental risk by significantly accelerating clean-up at the DOE-EM sites. In order to develop and implement these recommendations, a number of corporate project teams were formed to identify, evaluate, and initiate implementation of alternatives for the different aspects of clean-up. In August 2002, a corporate team was formed to review all aspects of the management, treatment, and disposalmore » of low level radioactive waste (LLW), mixed low level radioactive waste (MLLW), transuranic waste (TRU), and hazardous waste (HW). Over the next 21 months, the Corporate Project Team: Disposing Waste, Reducing Risk, developed a number of alternatives for implementing the recommendations of the Top-To-Bottom Review based on information developed during numerous site visits and interviews with complex and industry personnel. With input from over a dozen EM sites at various stages of clean-up, the team identified the barriers to the treatment and disposal of low level waste, mixed low level waste, and transuranic waste. Once identified, preliminary design alternatives were developed and presented to the Acquisition Authority (for this project, the Assistant Secretary for Environmental Management) for review and approval. Once the preliminary design was approved, the team down selected to seven key alternatives which were subsequently fully developed in the Project Execution Plan. The seven most viable alternatives were: (1) creation of an Executive Waste Disposal Board; (2) projectizing the disposal of low level waste and mixed low level waste; (3) creation of a National Consolidation and Acceleration Facility for waste; (4) improvements to the Broad Spectrum contract; (5) improvements to the Toxic Substance Control Act (TSCA) Incinerator contract and operations; (6) development of a policy for load management of waste shipments to the Waste Isolation Pilot Plant (WIPP); and (7) development of a complex-wide fee incentive for transuranic waste disposal. The alternatives were further refined and a plan developed for institutionalizing the alternatives in various site contracts. In order to focus the team's efforts, all team activities were conducted per the principles of DOE Order 413.3, Program and Project Management for the Acquisition of Capital Assets. Although the Order was developed for construction projects, the principles were adapted for use on this ''soft'' project in which the deliverables were alternatives for the way work was performed. The results of the team's investigation and the steps taken during the project are presented along with lessons learned.« less
Wickham, Anthony; Steinmetz, Hans-Jürgen; O'Sullivan, Patrick; Ojovan, Michael I
2017-05-01
Demonstrating competence in planning and executing the disposal of radioactive wastes is a key factor in the public perception of the nuclear power industry and must be demonstrated when making the case for new nuclear build. This work addresses the particular waste stream of irradiated graphite, mostly derived from reactor moderators and amounting to more than 250,000 tonnes world-wide. Use may be made of its unique chemical and physical properties to consider possible processing and disposal options outside the normal simple classifications and repository options for mixed low or intermediate-level wastes. The IAEA has an obvious involvement in radioactive waste disposal and has established a new project 'GRAPA' - Irradiated Graphite Processing Approaches - to encourage an international debate and collaborative work aimed at optimising and facilitating the treatment of irradiated graphite. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-06-01
The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems. (DLC)
Remediation by in-situ solidification/stabilisation of Ardeer landfill, Scotland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wyllie, M.; Esnault, A.; Barker, P.
1997-12-31
The Ardeer Landfill site at ICI Explosives factory on the west coast of Scotland had been a repository for waste from the site for 40 years. In order to safeguard the local environment ICI Explosives, with approval of Local Authorities and the Clyde River Purification Board put into action a programme of investigation and planning which culminated in the in-situ treatment of 10,000 m3 of waste within the landfill by a deep mixing method using the {open_quotes}Colmix{close_quotes} system. The paper describes in varying degrees of detail the remediation from investigation to the execution of the in-situ stabilisation and presents themore » post construction monitoring results.« less
NASA Technical Reports Server (NTRS)
Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor
2003-01-01
Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honeyman, J.O.
1998-01-09
This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Certa, P.J.
1998-01-07
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Christopher F.; Rapko, Brian M.; Serne, R. Jeffrey
2014-03-03
The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) were chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated withmore » the Cast Stone waste immobilization and technetium removal projects at Hanford. Science and technology gaps were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separation of technetium from waste processing streams. Technical approaches to address the science and technology gaps were identified and an initial sequencing priority was suggested. A subset of research was initiated in 2013 to begin addressing the most significant science and technology gaps. The purpose of this paper is to report progress made towards closing these gaps and provide notable highlights of results achieved to date.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frankel, D.R.
1980-01-01
Several recent congressional and executive proposals address the political problem posed by nuclear wastes. The proposals are divided into three categories on the basis of the degree of authority granted to state officials in siting decisions: those granting states a veto power, those providing for consultation with state officials during planning, and those leaving plenary authority in the hands of the Federal goverment. Legislative proposals are discussed under these categories. The most-balanced approach provides a formal role for state officials without granting the states an absolute veto. This solution provides a political outlet for local concern and ensures a widermore » range of views. It also avoids the problem, inherent in the state veto, of sacrificing the national interest in selecting the safest possible disposal site. 69 references.« less
Plan Execution Interchange Language (PLEXIL)
NASA Technical Reports Server (NTRS)
Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi
2006-01-01
Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.
78 FR 28243 - Senior Executive Service; Performance Review Board; Members
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-14
... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...
76 FR 29013 - Senior Executive Service; Performance Review Board; Members
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-19
... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...
U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROMINE, L.D.
2006-02-01
The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is availablemore » to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.« less
Solid Waste Management Plan. Revision 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-26
The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.
Monitored execution of robot plans produced by STRIPS.
NASA Technical Reports Server (NTRS)
Fikes, R. E.
1972-01-01
We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. King
2011-10-10
The U.S. Department of Energy (DOE) Oak Ridge Office requested support from the Oak Ridge Institute for Science and Education (ORISE) contract to delineate the extent of strontium titanate (SrTiO3) contamination in and around Solid Waste Storage Area (SWSA) 7 as part of the Oak Ridge National Priorities List Site boundary definition program. The study area is presented in Fig. 1.1 relative to the Oak Ridge Reservation (ORR). The investigation was executed according to Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) (DOE 2011) to supplement previous investigations noted below and to determine what areas, if any, have been adverselymore » impacted by site operations.« less
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
Relocation of net-acid-generating waste to improve post-mining water chemistry.
Morin, K A; Hutt, N M
2001-01-01
Acidic drainage and metal leaching are long-term environmental liabilities that can persist for many decades to millennia. One technique to improve the water chemistry and ecology of post-mining landscapes is to relocate and submerge net-acid-generating mine materials in a lake or water-retaining impoundment. One example of a carefully executed relocation of waste rock took place at the Eskay Creek Mine in Canada. Pre-relocation studies included an empirical relationship that related (1) the amount of acidity retained by the waste rock during past oxidation to (2) the amount of lime needed in each truckload for neutralization of the acidity and for suppression of metal release. During relocation, thousands of rinse pH measurements indicated net acidity varied significantly over short distances within the waste rock and that acidic rock could not be reliably segregated from near-netural rock. After relocation, water from the watershed continued to be acidic for a few years, then returned to near-neutral pH and near-background concentrations of metals. The chemistry of the lake where the waste rock was submerged remains near background conditions. Therefore, with careful planning and implementation, the relocation and submergence of net-acid-generating materials can greatly improve post-mining water chemistry.
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
Closedure - Mine Closure Technologies Resource
NASA Astrophysics Data System (ADS)
Kauppila, Päivi; Kauppila, Tommi; Pasanen, Antti; Backnäs, Soile; Liisa Räisänen, Marja; Turunen, Kaisa; Karlsson, Teemu; Solismaa, Lauri; Hentinen, Kimmo
2015-04-01
Closure of mining operations is an essential part of the development of eco-efficient mining and the Green Mining concept in Finland to reduce the environmental footprint of mining. Closedure is a 2-year joint research project between Geological Survey of Finland and Technical Research Centre of Finland that aims at developing accessible tools and resources for planning, executing and monitoring mine closure. The main outcome of the Closedure project is an updatable wiki technology-based internet platform (http://mineclosure.gtk.fi) in which comprehensive guidance on the mine closure is provided and main methods and technologies related to mine closure are evaluated. Closedure also provides new data on the key issues of mine closure, such as performance of passive water treatment in Finland, applicability of test methods for evaluating cover structures for mining wastes, prediction of water effluents from mine wastes, and isotopic and geophysical methods to recognize contaminant transport paths in crystalline bedrock.
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malone, C.
1995-12-01
Objective resolution of environmental issues involves questions of facts and values, and, for environmental issues to be resolved ethically, a proper synthesis of environmental facts with questions of ethics must occur. In this case study, the proposal by the U.S. Department of Energy (DOE) to use the Yucca Mountain site in southwest Nevada as a deep geologic repository for the permanent disposal of the nation`s high-level nuclear waste is examined in part in the context of the {open_quotes}Code of Ethics and Standards of Practice for Environmental Professionals{close_quotes} adopted by the National Association of Environmental Professionals (NAEP). Current plans are thatmore » a repository at the Yucca Mountain site would begin functioning in 2010 and would be sealed after about 150 years. The requirement that a geologic repository must isolate nuclear waste from the environment for at least 10,000 years poses unique challenges to environmental professionals. This case study also analyzes the challenges in terms of the implications of a new federal Executive Order on Ecosystem Management and corresponding internal orders within all federal agencies to conform to the Executive Order. The imposition of the principles and practices of ecosystem-based resource management on federal agencies provides an opportunity to also address, in the context of the DOE Yucca Mountain Project, (1) the ecosystem approach to environmental management, (2) concepts of holistic resource management planning, and (3) the concepts of sustainability and biodiversity. Within this framework there are important implications for environmental ethics and professional practice that must remain at the forefront of concerns of the NAEP over the next two decades.« less
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What is a waste management plan? 62...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed...
40 CFR 60.3010 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...
ENERGY CONSERVATION AND PRODUCTION AT WASTE CLEANUP SITES (ISSUE PAPER)
Saving energy used by hazardous waste cleanup remediation systems should interest those people working on waste cleanup sites. Presidential Executive Order 13123, "Greening the Government Through Efficient Energy Management", states that each agency shall strive to expand the us...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...
Waste Management, Treatment, and Disposal for the Food Processing Industry. Special Circular 113.
ERIC Educational Resources Information Center
Wooding, N. Henry
This publication contains information relating to waste prevention, treatment and disposal, and waste product utilization. Its primary purpose is to provide information that will help the food industry executive recognize waste problems and make wise management decisions. The discussion of the methods, techniques, and the state-of-the-art is…
Developing an effective business plan.
Lehman, L B
1996-06-01
At some time, virtually all managed care executives, and most physician executives, will be asked to develop business plans. Business plans are thoughtful, comprehensive, and realistic descriptions of the many aspects of the formulation of a new business product or line for market. The author describes what goes into the writing of a business plan and how the physician executive should approach this task.
40 CFR 60.2625 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no...
General Temporal Knowledge for Planning and Data Mining
NASA Technical Reports Server (NTRS)
Morris, Robert; Khatib, Lina
2001-01-01
We consider the architecture of systems that combine temporal planning and plan execution and introduce a layer of temporal reasoning that potential1y improves both the communication between humans and such systems, and the performance of the temporal planner itself. In particular, this additional layer simultaneously supports more flexibility in specifying and maintaining temporal constraints on plans within an uncertain and changing execution environment, and the ability to understand and trace the progress of plan execution. It is shown how a representation based on single set of abstractions of temporal information can be used to characterize the reasoning underlying plan generation and execution interpretation. The complexity of such reasoning is discussed.
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must my waste management plan be... Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your...
40 CFR 62.14432 - When must my waste management plan be completed?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS
The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...
40 CFR 60.55c - Waste management plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...
40 CFR 60.55c - Waste management plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...
THE FEASIBILITY OF UTILIZING SOLID WASTES FOR BUILDING MATERIALS. EXECUTIVE SUMMARY
This report focuses on two phases of a suggested four phase study to evaluate the technological and commercial possibilities of waste - derived composites. The first phase involved a joint and comprehensive literature search to identify wastes with potential as building materials...
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, David A.
2013-12-12
The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance andmore » Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.« less
40 CFR 62.14715 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...
40 CFR 62.14715 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...
40 CFR 62.14715 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...
40 CFR 62.14715 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...
40 CFR 62.14715 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for..., 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zorpas, Antonis A., E-mail: antonis.zorpas@ouc.ac.cy; Lasaridi, Katia, E-mail: klasaridi@hua.gr; Voukkali, Irene
Highlights: • Waste framework directive has set clear waste prevention procedures. • Household Compositional analysis. • Waste management plans. • Zero waste approach. • Waste generation. - Abstract: Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impactmore » on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes.« less
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
40 CFR 60.2900 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...
Embedding Temporal Constraints For Coordinated Execution in Habitat Automation
NASA Technical Reports Server (NTRS)
Morris, Paul; Schwabacher, Mark; Dalal, Michael; Fry, Charles
2013-01-01
Future NASA plans call for long-duration deep space missions with human crews. Because of light-time delay and other considerations, increased autonomy will be needed. This will necessitate integration of tools in such areas as anomaly detection, diagnosis, planning, and execution. In this paper we investigate an approach that integrates planning and execution by embedding planner-derived temporal constraints in an execution procedure. To avoid the need for propagation, we convert the temporal constraints to dispatchable form. We handle some uncertainty in the durations without it affecting the execution; larger variations may cause activities to be skipped.
Sanders, Chad; Low, Christina; Schmitter-Edgecombe, Maureen
2014-01-01
There is currently limited research evaluating planning abilities, a core subcomponent of executive functioning, in individuals with mild cognitive impairment (MCI). In the present study, we utilized the "Amap Task," an open-ended problem-solving task, to separately evaluate the formulation and execution components of planning ability in individuals with MCI. Thirty-seven cognitively healthy older adults and 37 individuals with MCI used a map layout of a university apartment to develop and write out a strategy (formulation stage) to successfully complete a list of tasks (e.g., retrieve and fill a water pitcher before placing it in the refrigerator). Subsequently, participants carried out the tasks in the apartment with the aid of their formulated plan (execution stage). MCI participants performed more poorly than older adult (OA) controls during both the formulation and execution stages on measures of task accuracy and task efficiency. However, both groups were able to adjust and improve task accuracy and efficiency from formulation to task execution. Finally, MCI participants took significantly longer to complete the task and adhered less to their formulated plans during task completion. Using an open-ended problem-solving task, the findings revealed that individuals with MCI experienced difficulties with both the formulation and execution components of planning. Like controls, participants with MCI were able to successfully modify their plan online, improving their performance from task formulation to task execution.
Hazardous Educational Waste Collections in Illinois.
ERIC Educational Resources Information Center
Illinois State Environmental Protection Agency, Springfield.
This report presents the status of programs designed to manage hazardous educational waste collections in secondary schools in the state of Illinois. Laboratory wastes, expired chemicals, unstable compounds, and toxic or flammable materials are accounted for in this document. The report contains an executive summary, a review of Illinois statutes…
40 CFR 62.14431 - What must my waste management plan include?
Code of Federal Regulations, 2010 CFR
2010-07-01
... waste management plan must identify both the feasibility of, and the approach for, separating certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from incinerated waste. The waste management plan you develop may address, but is not limited to, paper...
40 CFR 62.14431 - What must my waste management plan include?
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste management plan must identify both the feasibility of, and the approach for, separating certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from incinerated waste. The waste management plan you develop may address, but is not limited to, paper...
40 CFR 60.2625 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no later than the date specified in table 1 of this...
Fast Transformation of Temporal Plans for Efficient Execution
NASA Technical Reports Server (NTRS)
Tsamardinos, Ioannis; Muscettola, Nicola; Morris, Paul
1998-01-01
Temporal plans permit significant flexibility in specifying the occurrence time of events. Plan execution can make good use of that flexibility. However, the advantage of execution flexibility is counterbalanced by the cost during execution of propagating the time of occurrence of events throughout the flexible plan. To minimize execution latency, this propagation needs to be very efficient. Previous work showed that every temporal plan can be reformulated as a dispatchable plan, i.e., one for which propagation to immediate neighbors is sufficient. A simple algorithm was given that finds a dispatchable plan with a minimum number of edges in cubic time and quadratic space. In this paper, we focus on the efficiency of the reformulation process, and improve on that result. A new algorithm is presented that uses linear space and has time complexity equivalent to Johnson s algorithm for all-pairs shortest-path problems. Experimental evidence confirms the practical effectiveness of the new algorithm. For example, on a large commercial application, the performance is improved by at least two orders of magnitude. We further show that the dispatchable plan, already minimal in the total number of edges, can also be made minimal in the maximum number of edges incoming or outgoing at any node.
40 CFR 62.14590 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the... waste management measures already in place, the costs of additional measures, the emissions reductions...
Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
SIMMONS, F.M.
2000-03-29
This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62.14580 Section 62.14580 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A...
40 CFR 60.3012 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Environmental studies were conducted to provide data that could be used by the Commissioner of Health for the State of New York in determining whether the Emergency Declaration Area surrounding the Love Canal hazardous-waste site is habitable. These volumes (II through IV) were reviewed by a peer-review panel of expert scientists. The scientists concluded that each of the three environmental studies was well planned and well executed. Volume V summarizes the peer review and gives additional information or clarifications as requested during the peer review. Volume V also provides additional supplemental statistical analyses requested by the peer reviewer panel.
WastePlan model implementation for New York State. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Visalli, J.R.; Blackman, D.A.
1995-07-01
WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less
Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.
1988-02-01
In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less
Waste policies gone soft: An analysis of European and Swedish waste prevention plans.
Johansson, Nils; Corvellec, Hervé
2018-04-30
This paper presents an analysis of European and Swedish national and municipal waste prevention plans to determine their capability of preventing the generation of waste. An analysis of the stated objectives in these waste prevention plans and the measures they propose to realize them exposes six problematic features: (1) These plans ignore what drives waste generation, such as consumption, and (2) rely as much on conventional waste management goals as they do on goals with the aim of preventing the generation of waste at the source. The Swedish national and local plans (3) focus on small waste streams, such as food waste, rather than large ones, such as industrial and commercial waste. Suggested waste prevention measures at all levels are (4) soft rather than constraining, for example, these plans focus on information campaigns rather than taxes and bans, and (5) not clearly connected to incentives and consequences for the actors involved. The responsibility for waste prevention has been (6) entrusted to non-governmental actors in the market such as companies that are then free to define which proposals suit them best rather than their being guided by planners. For improved waste prevention regulation, two strategies are proposed. First, focus primarily not on household-related waste, but on consumption and production of products with high environmental impact and toxicity as waste. Second, remove waste prevention from the waste hierarchy to make clear that, by definition, waste prevention is not about the management of waste. Copyright © 2018 Elsevier Ltd. All rights reserved.
40 CFR 60.2755 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... waste management plan? You must submit the waste management plan no later than the date specified in... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On...
40 CFR 60.2755 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... waste management plan? You must submit the waste management plan no later than the date specified in... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...
No-migration variance petition. Appendices A--B: Volume 2, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-03-01
Volume II contains Appendix A, emergency plan and Appendix B, waste analysis plan. The Waste Isolation Pilot Plant (WIPP) Emergency plan and Procedures (WP 12-9, Rev. 5, 1989) provides an organized plan of action for dealing with emergencies at the WIPP. A contingency plan is included which is in compliance with 40 CFR Part 265, Subpart D. The waste analysis plan provides a description of the chemical and physical characteristics of the wastes to be emplaced in the WIPP underground facility. A detailed discussion of the WIPP Waste Acceptance Criteria and the rationale for its established units are also included.
40 CFR 60.2755 - When must I submit my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Recordkeeping and Reporting § 60.2755 When must I submit my waste management plan? You must submit the waste management plan...
40 CFR 60.3011 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit...
Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.
5 CFR 430.305 - Planning and communicating performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...
5 CFR 430.305 - Planning and communicating performance.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...
Going for gold: blood planning for the London 2012 Olympic Games.
Glasgow, S M; Allard, S; Rackham, R; Doughty, H
2014-06-01
The Olympics is one of the largest sporting events in the world. Major events may be complicated by disruption of normal activity and major incidents. Health care and transfusion planners should be prepared for both. Previously, transfusion contingency planning has focused on seasonal blood shortages and pandemic influenzas. This article is the first published account of transfusion contingency planning for a major event. We describe the issues encountered and the lessons identified during transfusion planning for the London 2012 Olympics. Planning was started 18 months in advance and was led by a project team reporting to the Executive. Planning was based on three periods of Gamestime. The requirements were planned with key stakeholders using normal processes enhanced by service developments. Demand planning was based on literature review together with computer modelling. The aim was blood-stock sufficiency complimented by a high readiness donor panel to minimise waste. Plans were widely communicated and table-top exercised. Full transfusion services were maintained during both Games with all demands met. The new service improvements and high readiness donors worked well. Emergency command and control have been upgraded. Red cell concentrate (RCC) stock aged but wastage was not significantly increased. The key to success was: early planning, stakeholder engagement, service developments, integration of transfusion service planning within the wider health care community and conduct within an assurance framework. © 2014 The Authors. Transfusion Medicine © 2014 British Blood Transfusion Society.
40 CFR 62.4178 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Existing Municipal Solid Waste Landfills § 62.4178 Identification of plan. (a) Identification of plan. Kansas plan for control of landfill gas emissions from existing municipal solid waste landfills and... to all existing municipal solid waste landfills for which construction, reconstruction, or...
Model-based Executive Control through Reactive Planning for Autonomous Rovers
NASA Technical Reports Server (NTRS)
Finzi, Alberto; Ingrand, Felix; Muscettola, Nicola
2004-01-01
This paper reports on the design and implementation of a real-time executive for a mobile rover that uses a model-based, declarative approach. The control system is based on the Intelligent Distributed Execution Architecture (IDEA), an approach to planning and execution that provides a unified representational and computational framework for an autonomous agent. The basic hypothesis of IDEA is that a large control system can be structured as a collection of interacting agents, each with the same fundamental structure. We show that planning and real-time response are compatible if the executive minimizes the size of the planning problem. We detail the implementation of this approach on an exploration rover (Gromit an RWI ATRV Junior at NASA Ames) presenting different IDEA controllers of the same domain and comparing them with more classical approaches. We demonstrate that the approach is scalable to complex coordination of functional modules needed for autonomous navigation and exploration.
Zorpas, Antonis A; Lasaridi, Katia; Voukkali, Irene; Loizia, Pantelitsa; Chroni, Christina
2015-04-01
Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes. Copyright © 2015 Elsevier Ltd. All rights reserved.
Oak Ridge Reservation Waste Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1995-02-01
This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.
The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes
This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.
NASA Technical Reports Server (NTRS)
Chien, Steve; Rabideau, Gregg; Tran, Daniel; Knight, Russell; Chouinard, Caroline; Estlin, Tara; Gaines, Daniel; Clement, Bradley; Barrett, Anthony
2007-01-01
CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.
Succession planning: a call to action for nurse executives.
Trepanier, Sylvain; Crenshaw, Jeannette T
2013-10-01
To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.
Secondary Waste Cast Stone Waste Form Qualification Testing Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westsik, Joseph H.; Serne, R. Jeffrey
2012-09-26
The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptablemore » for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF« less
Project Plan: Salt in Situ Heater Test.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhlman, Kristopher L.; Mills, Melissa Marie; Herrick, Courtney G.
This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years.more » The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.« less
Kennedy Space Center Five Year Sustainability Plan
NASA Technical Reports Server (NTRS)
Williams, Ann T.
2016-01-01
The Federal Government is committed to following sustainable principles. At its heart, sustainability integrates environmental, societal and economic solutions for present needs without compromising the ability of future generations to meet their needs. Building upon its pledge towards environmental stewardship, the Administration generated a vision of sustainability spanning ten goals mandated within Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade. In November 2015, the National Aeronautics and Space Administration (NASA) responded to this EO by incorporating it into a new release of the NASA Strategic Sustainability Performance Plan (SSPP). The SSPP recognizes the importance of aligning environmental practices in a manner that preserves, enhances and strengthens NASA's ability to perform its mission indefinitely. The Kennedy Space Center (KSC) is following suit with KSC's Sustainability Plan (SP) by promoting, maintaining and pioneering green practices in all aspects of our mission. KSC's SP recognizes that the best sustainable solutions use an interdisciplinary, collaborative approach spanning civil servant and contractor personnel from across the Center. This approach relies on the participation of all employees to develop and implement sustainability endeavors connected with the following ten goals: Reduce greenhouse gas (GHG) emissions. Design, build and maintain sustainable buildings, facilities and infrastructure. Leverage clean and renewable energy. Increase water conservation. Improve fleet and vehicle efficiency and management. Purchase sustainable products and services. Minimize waste and prevent pollution. Implement performance contracts for Federal buildings. Manage electronic equipment and data centers responsibly. Pursue climate change resilience. The KSC SP details the strategies and actions that address the following objectives: Reduce Center costs. center dot Increase energy and water efficiencies. Promote smart buying practices. Increase reuse and recycling while decreasing waste. Benefit the community. Meet or exceed the EO and NASA SSPP sustainability goals.
A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism
ERIC Educational Resources Information Center
van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H. G.; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.
2010-01-01
Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between "motor" and "executive" planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or anticlockwise.…
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Executive Order 13148 of April 21, 2000, Greening the Government through Leadership in Environmental Management. (e) Executive Order 13101 of September 14, 1998, Greening the Government through Waste Prevention... through Efficient Energy Management. (g) Farm Security and Rural Investment Act of 2002 (FSRIA) (7 U.S.C...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.
1995-03-01
This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance.more » Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.« less
Des Moines metropolitan area ITS strategic plan : executive summary
DOT National Transportation Integrated Search
1997-12-01
This is an executive summary of a strategic plan for deploying Intelligent Transportation Systems (ITS) technology in the Des Moines metropolitan area. The plan was developed as part of the Des Moines ITS Early Deployment Study (EDS). ITS is the use ...
40 CFR 62.1950 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.1950 Identification of plan. Section 111(d) plan for municipal solid waste landfills and the associated Delaware Department of Natural Resources, Division of Air and Waste Management, Regulation No. 20, Section 28, as submitted on...
State survey of medical boards regarding abrupt loss of a prescriber of controlled substances.
Sera, Leah; Brown, Micke; McPherson, Mary Lynn; Walker, Kathryn A; Klein-Schwartz, Wendy
The purpose of the study was to evaluate states' experiences with abrupt changes in controlled substances (CS) prescribing, to determine whether states have action plans in place to manage such situations, and describe the components of any such plans. A survey of executive directors of 51 medical boards was conducted to evaluate states' experiences with abrupt changes in CS prescribing, the extent of consumer complaints attributed to these events, and the types of plans in place to manage these situations. Forty-six executive directors of medical boards responded. Twenty boards (43.5 percent) confirmed that their state had experienced abrupt loss of CS providers and 11 (55 percent) of these executive directors indicated that the loss resulted in increased consumer complaints. The majority of executive directors (86 percent) had no action plan. Six executive directors reported some type of action plan or process consisting of regulatory action, patient-provider connection, professional education, patient education, or public notice. Most states do not have operational plans in place. However, a few have key strategies that may be useful in addressing potential problems following abrupt loss of a CS prescriber. State medical boards can play a significant role in the development of comprehensive preparedness plans to mitigate damage from the loss of CS prescribers in the community.
Evaluating the Theory of Executive Dysfunction in Autism
ERIC Educational Resources Information Center
Hill, Elisabeth L.
2004-01-01
In this paper studies of executive function in autism spectrum disorder are reviewed. Executive function is an umbrella term for functions such as planning, working memory, impulse control, inhibition, and shifting set, as well as for the initiation and monitoring of action. In this review, the focus will be on planning, inhibition, shifting set,…
Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization
NASA Technical Reports Server (NTRS)
Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.
2010-01-01
This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.
Expected Utility Distributions for Flexible, Contingent Execution
NASA Technical Reports Server (NTRS)
Bresina, John L.; Washington, Richard
2000-01-01
This paper presents a method for using expected utility distributions in the execution of flexible, contingent plans. A utility distribution maps the possible start times of an action to the expected utility of the plan suffix starting with that action. The contingent plan encodes a tree of possible courses of action and includes flexible temporal constraints and resource constraints. When execution reaches a branch point, the eligible option with the highest expected utility at that point in time is selected. The utility distributions make this selection sensitive to the runtime context, yet still efficient. Our approach uses predictions of action duration uncertainty as well as expectations of resource usage and availability to determine when an action can execute and with what probability. Execution windows and probabilities inevitably change as execution proceeds, but such changes do not invalidate the cached utility distributions, thus, dynamic updating of utility information is minimized.
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Commercial and Industrial Solid Waste Incineration Units Waste Management Plan § 60.2060 When must I submit...
40 CFR 60.2060 - When must I submit my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Commercial and Industrial Solid Waste Incineration Units Waste Management Plan § 60.2060 When must I submit...
40 CFR 62.14590 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What should I include in my waste...
40 CFR 62.14585 - When must I submit my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must I submit my waste management...
Age-related differences in the motor planning of a lower leg target matching task.
Davies, Brenda L; Gehringer, James E; Kurz, Max J
2015-12-01
While the development and execution of upper extremity motor plans have been well explored, little is known about how individuals plan and execute rapid, goal-directed motor tasks with the lower extremities. Furthermore, the amount of time needed to integrate the proper amount of visual and proprioceptive feedback before being able to accurately execute a goal-directed movement is not well understood; especially in children. Therefore, the purpose of this study was to initially interrogate how the amount of motor planning time provided to a child before movement execution may influence the preparation and execution of a lower leg goal-directed movement. The results displayed that the amount of pre-movement motor planning time provided may influence the reaction time and accuracy of a goal directed leg movement. All subjects in the study had longer reaction times and less accurate movements when no pre-movement motor planning time was provided. In addition, the children had slower reaction times, slower movements, and less accurate movements than the adults for all the presented targets and motor planning times. These results highlight that children may require more time to successfully plan a goal directed movement with the lower extremity. This suggests that children may potentially have less robust internal models than adults for these types of motor skills. Copyright © 2015 Elsevier B.V. All rights reserved.
Mission Data System Java Edition Version 7
NASA Technical Reports Server (NTRS)
Reinholtz, William K.; Wagner, David A.
2013-01-01
The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.
Plan execution monitoring with distributed intelligent agents for battle command
NASA Astrophysics Data System (ADS)
Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.
2004-07-01
As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Park Service (NPS) is preparing a Chronic Wasting Disease Management Plan and Environmental Impact Statement (CWD Management Plan/EIS) for Shenandoah National Park, Virginia. Action is needed at this time...
12 CFR 563b.110 - Who must review my business plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Who must review my business plan? 563b.110... business plan? (a) Your chief executive officer and members of the board of directors must review, and at least two-thirds of your board of directors must approve, the business plan. (b) Your chief executive...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigsby V.P.
2009-02-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).« less
Local Governments (Executive Offices) Sector (NAICS 921110)
EPA regulatory information for government executive offices, including state implementation plans (SIPs), local emergency planning under EPCRA, drinking water treatment, water supply security, and compliance assistance for boiler & combustion regulations.
13 CFR 108.320 - Contents of comprehensive business plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Contents of comprehensive business plan. 108.320 Section 108.320 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS... Contents of comprehensive business plan. (a) Executive summary. The executive summary must include a...
Code of Federal Regulations, 2014 CFR
2014-07-01
... waste combustion units must I include in my State plan? 60.1565 Section 60.1565 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... of small municipal waste combustion units must I include in my State plan? This subpart specifies...
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste combustion units must I include in my State plan? 60.1565 Section 60.1565 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... of small municipal waste combustion units must I include in my State plan? This subpart specifies...
Code of Federal Regulations, 2012 CFR
2012-07-01
... waste combustion units must I include in my State plan? 60.1565 Section 60.1565 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... of small municipal waste combustion units must I include in my State plan? This subpart specifies...
Code of Federal Regulations, 2013 CFR
2013-07-01
... waste combustion units must I include in my State plan? 60.1565 Section 60.1565 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... of small municipal waste combustion units must I include in my State plan? This subpart specifies...
Code of Federal Regulations, 2010 CFR
2010-07-01
... waste combustion units must I include in my State plan? 60.1565 Section 60.1565 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... of small municipal waste combustion units must I include in my State plan? This subpart specifies...
The U.S. Department of Energy's Carlsbad Field Office (DOE/CBFO) provided the U.S. Environmental Protection Agency (EPA) this Notification of Planned Change to accept remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP).
Estimation of the annual production and composition of C&D Debris in Galicia (Spain).
Martínez Lage, Isabel; Martínez Abella, Fernando; Herrero, Cristina Vázquez; Ordóñez, Juan Luis Pérez
2010-04-01
One of the key aspects that must be taken into consideration within the framework of Sustainable Construction is the management of Construction and Demolition (C&D) Debris. As for other types of waste, specific handling procedures are required to manage C&D Debris; these include reduction, reuse, recycling, and if all other possibilities fail, recovery or disposal. For public planning strategies aimed at the management of C&D Debris to be effective, it is first necessary to have specific knowledge of the type of waste materials generated in a particular region. After verifying that the methods available to determine the production and composition of C&D Debris are limited, this paper presents a procedure to ascertain the production and composition of C&D Debris, in any region. The procedure utilizes data on the surface areas of newly constructed buildings, renovations and demolitions, which are estimated from available data for recent years, as well as information on the quantity of debris generated per surface area in any type of construction site, which is obtained from recently executed constructions or from the ground plans of older buildings. The method proposed here has been applied to Galicia, one of Spain's autonomous communities, for which the quantity and composition of C&D Debris have been estimated for the horizon year 2011. Copyright 2009 Elsevier Ltd. All rights reserved.
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
Integrated Demonstration of Instrument Placement , Robust Execution and Contingent Planning
NASA Technical Reports Server (NTRS)
Pedersen, L.; Bualat, M.; Lees, D.; Smith, D. E.; Korsmeyer, David (Technical Monitor); Washington, R.
2003-01-01
This paper describes an integrated demonstration of ground-based contingent planning, robust execution and autonomous instrument placement for the efficient exploration of a site by a prototype Mars rover.
Josimović, Boško; Marić, Igor; Milijić, Saša
2015-02-01
Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.
Hazardous-waste analysis plan for LLNL operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, R.S.
The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan willmore » address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.« less
10 CFR 72.142 - Quality assurance organization.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., or consultants, the work of establishing and executing the quality assurance program, but the... 10 Energy 2 2014-01-01 2014-01-01 false Quality assurance organization. 72.142 Section 72.142... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Quality...
10 CFR 72.142 - Quality assurance organization.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., or consultants, the work of establishing and executing the quality assurance program, but the... 10 Energy 2 2012-01-01 2012-01-01 false Quality assurance organization. 72.142 Section 72.142... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Quality...
10 CFR 72.142 - Quality assurance organization.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., or consultants, the work of establishing and executing the quality assurance program, but the... 10 Energy 2 2013-01-01 2013-01-01 false Quality assurance organization. 72.142 Section 72.142... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Quality...
Nitrate Waste Treatment Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.; Martinez, Patrick Thomas; Garcia, Terrence Kerwin
2017-07-05
This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
NASA Technical Reports Server (NTRS)
Homem De Mello, Luiz S.; Sanderson, Arthur C.
1991-01-01
The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.
40 CFR 60.35e - Waste management guidelines.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Waste management guidelines. 60.35e... Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State plan shall include the requirements for a waste management plan at least as protective as those...
40 CFR 60.35e - Waste management guidelines.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Waste management guidelines. 60.35e... Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State plan shall include the requirements for a waste management plan at least as protective as those...
40 CFR 60.35e - Waste management guidelines.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Waste management guidelines. 60.35e... Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State plan shall include the requirements for a waste management plan at least as protective as those...
40 CFR 60.35e - Waste management guidelines.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Waste management guidelines. 60.35e... Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State plan shall include the requirements for a waste management plan at least as protective as those...
Real-Time Projection to Verify Plan Success During Execution
NASA Technical Reports Server (NTRS)
Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.
2012-01-01
The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.
Robustness via Run-Time Adaptation of Contingent Plans
NASA Technical Reports Server (NTRS)
Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)
2000-01-01
In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.
Tribal Waste Journal: What Is an Integrated Waste Management Plan (Issue 7)
Integrated Waste Management Plans (IWMPs) may offer tribes an efficient and cost-effective way to reduce open dumping, effectively manage solid waste, and protect human health and the environment for this generation and the next.
Strategic benefits of master facility plans.
Shannon, K
1996-02-01
In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.
40 CFR 62.3916 - Identification of Plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Existing Commercial and Industrial Solid Waste Incineration Units § 62.3916 Identification of Plan. (a... reference subpart III of 40 CFR part 62, the commercial and industrial solid waste incineration rule, which... plan applies to all applicable existing Commercial and Industrial Solid Waste Incineration Units for...
40 CFR 62.3916 - Identification of Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Existing Commercial and Industrial Solid Waste Incineration Units § 62.3916 Identification of Plan. (a... reference subpart III of 40 CFR part 62, the commercial and industrial solid waste incineration rule, which... plan applies to all applicable existing Commercial and Industrial Solid Waste Incineration Units for...
Yanaoka, Kaichi
2016-02-01
This research examined the effects of planning and executive functions on young children's (ages 3-to 5-years) strategies in changing scripts. Young children (N = 77) performed a script task (doll task), three executive function tasks (DCCS, red/blue task, and nine box task), a planning task, and a receptive vocabulary task. In the doll task, young children first enacted a "changing clothes" script, and then faced a situation in which some elements of the script were inappropriate. They needed to enact a script by compensating inappropriate items for the other-script items or by changing to the other script in advance. The results showed that shifting, a factor of executive function, had a positive influence on whether young children could compensate inappropriate items. In addition, planning was also an important factor that helped children to change to the other script in advance. These findings suggest that shifting and planning play different roles in using the two strategies appropriately when young children enact scripts in unexpected situations.
NASA Technical Reports Server (NTRS)
Hoebel, Louis J.
1993-01-01
The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...
2016-06-28
Springs, Colorado from May 31- June 4, 2015. ONR support in the an1otmt of$15,000 was provided to support the planning , execution , and dissemination of...held in Colorado Springs, Colorado from May 31- June 4, 2015. ONR support in the amount of $15,000 was provided to support the planning , execution ...support to assist TMS in carrying out the various necessary phases of the planning , execution , and result- dissemination efforts of the Congress. In
Sustainable gold mining management waste policy in Romania
NASA Astrophysics Data System (ADS)
Tudor, Elena; Filipciuc, Constantina
2016-04-01
Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands. According to the World Commission on Environment and Development definition, sustainable development is the type of development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Romania has the largest gold reserves in Europe (760 million tons of gold-silver ores, of which 40 million tons in 68 gold deposits in the Apuseni Mountains. New mining projects draw particular attention regarding the environmental risks they cause. Rehabilitation is an ongoing consideration throughout the mine's lifecycle, both from a technical and a financial standpoint. The costs of land rehabilitation are classified as the mine's operating costs. According to Directive 2004/35/EC on environmental liability, the prevention and remedying of environmental damage should be implemented by applying the "polluter pays" principle, in line with the principle of sustainable development. Directive on the management of waste from extractive industries and amending Directive obliges operators to provide (and periodically adjust in size) a financial guarantee for waste facility maintenance and post-closure site restoration, including land rehabilitation. According to the Romanian Mining Law, the license holder has the following obligations related to land use and protection: to provide environmental agreements as one of the prerequisites for a building permit; to regularly update the mine closure plan; to set up and maintain the financial guarantee for environmental rehabilitation; and to execute and finalize the environmental rehabilitation of affected land in the mining site, according to the mine closure plan, including the post-closure monitoring program implementation and financing. Apart from the Mining Law, the Government Decision, which transposes EU Directive on the management of waste from extractive industries, as well as Government Emergency Ordinance, which implements the requirements of EU Directive 2004/35/CE on environmental liability, requests financial guarantees for waste facilities maintenance and for environment restoration in the case of pollution, respectively. In practice, there are problems in the calculation of the financial guarantee and the development of financial security instruments and markets as required by Directive, due to the lack of expertise in financial, economic and liability matters. Mining companies are usually not required to set up a special guarantee for the waste facilities, but only to set up and maintain the financial guarantee regulated under the Mining Law. Romania - because of the structure of its mining sector - has serious environmental legacies, a lack of funds for their restoration and the need to strengthen the administrative capacity in this area, as well as the important tasks on harmonization and/or implementation of the EU mining waste legislation. This work is presented within the framework of SUSMIN project. Key words : sustainable development, waste management, policy
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Appeals. 1303.114 Section 1303.114 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.114 Appeals. (a)(1) Appeals of adverse... Executive Director: (i) By mail to: U.S. Nuclear Waste Technical Review Board, 2300 Clarendon Boulevard...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Appeals. 1303.114 Section 1303.114 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.114 Appeals. (a)(1) Appeals of adverse... Executive Director: (i) By mail to: U.S. Nuclear Waste Technical Review Board, 2300 Clarendon Boulevard...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Appeals. 1303.114 Section 1303.114 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.114 Appeals. (a)(1) Appeals of adverse... Executive Director: (i) By mail to: U.S. Nuclear Waste Technical Review Board, 2300 Clarendon Boulevard...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Appeals. 1303.114 Section 1303.114 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.114 Appeals. (a)(1) Appeals of adverse... Executive Director: (i) By mail to: U.S. Nuclear Waste Technical Review Board, 2300 Clarendon Boulevard...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Appeals. 1303.114 Section 1303.114 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.114 Appeals. (a)(1) Appeals of adverse... Executive Director: (i) By mail to: U.S. Nuclear Waste Technical Review Board, 2300 Clarendon Boulevard...
Recovering from execution errors in SIPE
NASA Technical Reports Server (NTRS)
Wilkins, D. E.
1987-01-01
In real-world domains (e.g., a mobile robot environment), things do not always proceed as planned, so it is important to develop better execution-monitoring techniques and replanning capabilities. These capabilities in the SIPE planning system are described. The motivation behind SIPE is to place enough limitations on the representation so that planning can be done efficiently, while retaining sufficient power to still be useful. This work assumes that new information given to the execution monitor is in the form of predicates, thus avoiding the difficult problem of how to generate these predicates from information provided by sensors. The replanning module presented here takes advantage of the rich structure of SIPE plans and is intimately connected with the planner, which can be called as a subroutine. This allows the use of SIPE's capabilities to determine efficiently how unexpected events affect the plan being executed and, in many cases, to retain most of the original plan by making changes in it to avoid problems caused by these unexpected events. SIPE is also capable of shortening the original plan when serendipitous events occur. A general set of replanning actions is presented along with a general replanning capability that has been implemented by using these actions.
Venkataramani, PrasannaVenkhatesh; Gopal, Atul; Murthy, Aditya
2018-03-01
Although race models have been extensively used to study inhibitory control, the mechanisms that enable change of reach plans in the context of race models remain unexplored. We used a redirect task in which targets occasionally changed their locations to study the control of reaching movements during movement planning and execution phases. We tested nine different race model architectures that could explain the redirect behavior of reaching movements. We show that an independent GO-STOP-GO model that reflects a plan-abort-re-plan strategy involving non-interacting elements successfully explained the various behavioral measures such as the compensation function and the pattern of error response reaction times. By extending the same race model to the execution phase, we could explain the extent and the pattern of hypometric trials. Interestingly, the race model also provided evidence that redirecting a movement during planning and execution shared the same inhibitory mechanism. Taken together, this study demonstrates the applicability of an independent race model to understand the computational mechanisms underlying the control of reach movements. © 2018 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.
Liquid secondary waste. Waste form formulation and qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cozzi, A. D.; Dixon, K. L.; Hill, K. A.
The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during Site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilization Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the Integrated Disposal Facility IDF). Waste form testingmore » to support this plan is composed of work in the near term to demonstrate the waste form will provide data as input to a performance assessment (PA) for Hanford’s IDF.« less
Development of an Integrated Waste Plan for Chalk River Laboratories - 13376
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, L.
2013-07-01
To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually formore » up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)« less
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2055 Section 60.2055 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60...
Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten
2013-01-01
Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).
Strategic Audit and Marketing Plan
ERIC Educational Resources Information Center
Wright, Lianna S.
2013-01-01
The purpose of this audit was to revise the marketing plan for ADSum Professional Development School and give the owner a long-term vision of the school to operate competitively in the crowded field of for-profit schools. It is fairly simple to create a strategic plan but harder to implement and execute. Execution requires weeks and months of…
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...
48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...
48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... published in the Federal Register a document seeking public input on the design of a plan to use for periodic retrospective review of its regulations (76 FR 9988). This input is being solicited in response to...] Extension of Comment Period: EPA's Plan for Retrospective Review Under Executive Order 13563 AGENCY...
Hughes, Charmayne M L; Reissig, Paola; Seegelke, Christian
2011-09-01
The issue of handedness has been the topic of great interest for researchers in a number of scientific domains. It is typically observed that the dominant hand yields numerous behavioral advantages over the non-dominant hand during unimanual tasks, which provides evidence of hemispheric specialization. In contrast to advantages for the dominant hand during motor execution, recent research has demonstrated that the right hand has advantages during motor planning (regardless of handedness), indicating that motor planning is a specialized function of the left hemisphere. In the present study we explored hemispheric advantages in motor planning and execution in left- and right-handed individuals during a bimanual grasping and placing task. Replicating previous findings, both motor planning and execution was influenced by object end-orientation congruency. In addition, although motor planning (i.e., end-state comfort) was not influenced by hand or handedness, motor execution differed between left and right hand, with shorter object transport times observed for the left hand, regardless of handedness. These results demonstrate that the hemispheric advantages often observed in unimanual tasks do not extend to discrete bimanual tasks. We propose that the differences in object transport time between the two hands arise from overt shifting visual fixation between the two hands/objects. Copyright © 2011 Elsevier B.V. All rights reserved.
40 CFR 60.2625 - When must I submit my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2625 When must I submit my waste...
Spiegel, M A; Koester, D; Weigelt, M; Schack, T
2012-02-16
How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barariu, G.
2008-07-01
The paper presents the progress of the Decontamination Plan and Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor VVR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for VVR-S decommissioning was also elaborated. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facilitymore » at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are a part of the radioactive waste management strategy. In conclusion: The current version 8 of the Draft Decommissioning Plan which include the Integrated concept of Decontamination and Decommissioning and Radwaste Management, reflects the substantial work that has been incorporated by IFIN-HH in collaboration with SITON, which has resulted in substantial improvement in document The decommissioning strategy must take into account costs for VVR-S Reactor decommissioning, as well as costs for much needed refurbishments to the radioactive waste treatment plant and the Baita-Bihor waste disposal repository. Several improvements to the Baita-Bihor repository and IFIN-HH waste treatment facility were proposed. The quantities and composition of the radioactive waste generated by VVR-S Reactor dismantling were again estimated by streams and the best demonstrated practicable processing solution was proposed. The estimated quantities of materials to be managed in the near future raise some issues that need to be solved swiftly, such as treatment of aluminum and lead and graphite management. It is envisaged that these materials to be treated to Subsidiary for Nuclear Research (SCN) Pitesti. (authors)« less
A Generalized-Compliant-Motion Primitive
NASA Technical Reports Server (NTRS)
Backes, Paul G.
1993-01-01
Computer program bridges gap between planning and execution of compliant robotic motions developed and installed in control system of telerobot. Called "generalized-compliant-motion primitive," one of several task-execution-primitive computer programs, which receives commands from higher-level task-planning programs and executes commands by generating required trajectories and applying appropriate control laws. Program comprises four parts corresponding to nominal motion, compliant motion, ending motion, and monitoring. Written in C language.
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
40 CFR 256.02 - Scope of the State solid waste management plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., General Requirements, Definitions § 256.02 Scope of the State solid waste management plan. (a)(1) The... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 256.02 - Scope of the State solid waste management plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., General Requirements, Definitions § 256.02 Scope of the State solid waste management plan. (a)(1) The... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 256.02 - Scope of the State solid waste management plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., General Requirements, Definitions § 256.02 Scope of the State solid waste management plan. (a)(1) The... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 256.02 - Scope of the State solid waste management plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., General Requirements, Definitions § 256.02 Scope of the State solid waste management plan. (a)(1) The... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 256.02 - Scope of the State solid waste management plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., General Requirements, Definitions § 256.02 Scope of the State solid waste management plan. (a)(1) The... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 60.2630 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... management plan? 60.2630 Section 60.2630 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my...
40 CFR 60.55c - Waste management plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and recycling of paper, cardboard, plastics, glass, batteries, food waste, and metals (e.g., aluminum cans, metals-containing devices); segregation of non-recyclable wastes (e.g., polychlorinated biphenyl... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Waste management plan. 60.55c Section...
Reconfigurable manufacturing execution system for pipe cutting
NASA Astrophysics Data System (ADS)
Yin, Y. H.; Xie, J. Y.
2011-08-01
This article presents a reconfigurable manufacturing execution system (RMES) filling the gap between enterprise resource planning and resource layer for pipe-cutting production with mass customisation and rapid adaptation to dynamic market, which consists of planning and scheduling layer and executive control layer. Starting from customer's task and process requirements, the cutting trajectories are planned under generalised mathematical model able to reconfigure in accordance with various intersecting types' joint, and all tasks are scheduled by nesting algorithm to maximise the utilisation rate of rough material. This RMES for pipe cutting has been effectively implemented in more than 100 companies.
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
Ballhausen, Nicola; Mahy, Caitlin E V; Hering, Alexandra; Voigt, Babett; Schnitzspahn, Katharina M; Lagner, Prune; Ihle, Andreas; Kliegel, Matthias
2017-01-01
A minimal amount of research has examined the cognitive predictors of children's performance in naturalistic, errand-type planning tasks such as the Zoo Map task of the Behavioral Assessment of the Dysexecutive Syndrome for Children (BADS-C). Thus, the current study examined prospection (i.e., the ability to remember to carry out a future intention), executive functioning, and intelligence markers as predictors of performance in this widely used naturalistic planning task in 56 children aged 7- to 12-years-old. Measures of planning, prospection, inhibition, crystallized intelligence, and fluid intelligence were collected in an individual differences study. Regression analyses showed that prospection (rather than traditional measures of intelligence or inhibition) predicted planning, suggesting that naturalistic planning tasks such as the Zoo Map task may rely on future-oriented cognitive processes rather than executive problem solving or general knowledge.
Wyckoff, Emily P; Evans, Brittney C; Manasse, Stephanie M; Butryn, Meghan L; Forman, Evan M
2017-04-01
Obesity is a significant public health issue, and is associated with poor diet. Evidence suggests that eating behavior is related to individual differences in executive functioning. Poor executive functioning is associated with poorer diet (few fruits and vegetables and high saturated fat) in normal weight samples; however, the relationship between these specific dietary behaviors and executive functioning have not been investigated in adults with obesity. The current study examined the association between executive functioning and intake of saturated fat, fruits, and vegetables in an overweight/obese sample using behavioral measures of executive function and dietary recall. One-hundred-ninety overweight and obese adults completed neuropsychological assessments measuring intelligence, planning ability, and inhibitory control followed by three dietary recall assessments within a month prior to beginning a behavioral weight loss treatment program. Inhibitory control and two of the three indices of planning each independently significantly predicted fruit and vegetable consumption such that those with better inhibition and planning ability consumed more fruits and vegetables. No relationship was found between executive functioning and saturated fat intake. Results increase understanding of how executive functioning influences eating behavior in overweight and obese adults, and suggest the importance of including executive functioning training components in dietary interventions for those with obesity. Further research is needed to determine causality as diet and executive functioning may bidirectionally influence each other. Copyright © 2017 Elsevier Ltd. All rights reserved.
40 CFR 62.1950 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Delaware Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.1950 Identification of plan. Section 111(d) plan for municipal solid waste landfills and the associated Delaware Department of...
40 CFR 62.9630 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Pennsylvania Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.9630 Identification of plan. Section 111(d) plan for municipal solid waste landfills and the associated Allegheny County...
Urban Operations, Untrained on Terrain.
1998-06-05
plans at the unit level, a more flexible organization, and procurement of new equipment. 19980731 069 14. SUBJECT TERMS Urban Terrain, Military...doctrine, a training facility and training plans at the unit level, a more flexible organization, and procurement of new equipment in ACKNOWLEDGMENTS...increased, decentralized execution, these operations must be planned and executed to enable leaders at the lowest levels to seize and exploit the
Chen, Xiujuan; Huang, Guohe; Zhao, Shan; Cheng, Guanhui; Wu, Yinghui; Zhu, Hua
2017-11-01
In this study, a stochastic fractional inventory-theory-based waste management planning (SFIWP) model was developed and applied for supporting long-term planning of the municipal solid waste (MSW) management in Xiamen City, the special economic zone of Fujian Province, China. In the SFIWP model, the techniques of inventory model, stochastic linear fractional programming, and mixed-integer linear programming were integrated in a framework. Issues of waste inventory in MSW management system were solved, and the system efficiency was maximized through considering maximum net-diverted wastes under various constraint-violation risks. Decision alternatives for waste allocation and capacity expansion were also provided for MSW management planning in Xiamen. The obtained results showed that about 4.24 × 10 6 t of waste would be diverted from landfills when p i is 0.01, which accounted for 93% of waste in Xiamen City, and the waste diversion per unit of cost would be 26.327 × 10 3 t per $10 6 . The capacities of MSW management facilities including incinerators, composting facility, and landfills would be expanded due to increasing waste generation rate.
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...
40 CFR 265.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT..., explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan must be carried out immediately...
40 CFR 264.51 - Purpose and implementation of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan must be carried out immediately whenever there...
40 CFR 256.01 - Purpose and scope of the guidelines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... guidelines is to assist in the development and implementation of State solid waste management plans, in accordance with section 4002(b) of the Solid Waste Disposal Act, as amended by the Resource Conservation and...
10 CFR 60.17 - Contents of site characterization plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... assurance to data collection, recording, and retention. (3) Plans for the decontamination and... rule or order, requires. (b) A description of the possible waste form or waste package for the high... practicable) of the relationship between such waste form or waste package and the host rock at such area, and...
10 CFR 60.17 - Contents of site characterization plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... assurance to data collection, recording, and retention. (3) Plans for the decontamination and... rule or order, requires. (b) A description of the possible waste form or waste package for the high... practicable) of the relationship between such waste form or waste package and the host rock at such area, and...
10 CFR 60.17 - Contents of site characterization plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... assurance to data collection, recording, and retention. (3) Plans for the decontamination and... rule or order, requires. (b) A description of the possible waste form or waste package for the high... practicable) of the relationship between such waste form or waste package and the host rock at such area, and...
10 CFR 60.17 - Contents of site characterization plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... assurance to data collection, recording, and retention. (3) Plans for the decontamination and... rule or order, requires. (b) A description of the possible waste form or waste package for the high... practicable) of the relationship between such waste form or waste package and the host rock at such area, and...
2010-05-01
23 Task Execution Plan 34 – Temperature Testing of Pyridostigmine Bromide (PB) .......... 23 KEY RESEARCH ACCOMPLISHMENTS...29, 2010. Staff was assembled and materials have been ordered. Task Execution Plan (TEP) 0034 – Temperature Testing of Pyridostigmine Bromide
Using Executive Information Systems to Manage Capital Projects and Facilities.
ERIC Educational Resources Information Center
Kaynor, Robert
1993-01-01
In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…
Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1993-12-01
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY)more » 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.« less
40 CFR 62.600 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Arizona Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.600 Identification of plan. The Arizona... Section 111(d) Plan for Existing Municipal Solid Waste Landfills. ...
40 CFR 62.9635 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Pennsylvania Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.9635 Identification of plan. Section 111(d) plan for municipal solid waste landfills, as submitted on July 1, 1997, and as...
20 strategies for marketing your managed care plan.
Firshein, J
1996-01-01
In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a...
Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M
2014-09-01
The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved. © The Author(s) 2014.
Site maps and facilities listings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less
Planning And Reasoning For A Telerobot
NASA Technical Reports Server (NTRS)
Peters, Stephen F.; Mittman, David S.; Collins, Carol E.; O'Meara Callahan, Jacquelyn S.; Rokey, Mark J.
1992-01-01
Document discusses research and development of Telerobot Interactive Planning System (TIPS). Goal in development of TIPS is to enable it to accept instructions from operator, then command run-time controller to execute operations to execute instructions. Challenges in transferring technology from testbed to operational system discussed.
Architecture for Control of the K9 Rover
NASA Technical Reports Server (NTRS)
Bresina, John L.; Bualat, maria; Fair, Michael; Wright, Anne; Washington, Richard
2006-01-01
Software featuring a multilevel architecture is used to control the hardware on the K9 Rover, which is a mobile robot used in research on robots for scientific exploration and autonomous operation in general. The software consists of five types of modules: Device Drivers - These modules, at the lowest level of the architecture, directly control motors, cameras, data buses, and other hardware devices. Resource Managers - Each of these modules controls several device drivers. Resource managers can be commanded by either a remote operator or the pilot or conditional-executive modules described below. Behaviors and Data Processors - These modules perform computations for such functions as planning paths, avoiding obstacles, visual tracking, and stereoscopy. These modules can be commanded only by the pilot. Pilot - The pilot receives a possibly complex command from the remote operator or the conditional executive, then decomposes the command into (1) more-specific commands to the resource managers and (2) requests for information from the behaviors and data processors. Conditional Executive - This highest-level module interprets a command plan sent by the remote operator, determines whether resources required for execution of the plan are available, monitors execution, and, if necessary, selects an alternate branch of the plan.
40 CFR 256.11 - Recommendations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... authorized State hazardous waste management program under subtitle C of the Act. (e) The State plan should... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Identification of Responsibilities...
40 CFR 256.11 - Recommendations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... authorized State hazardous waste management program under subtitle C of the Act. (e) The State plan should... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Identification of Responsibilities...
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
Groves, Kevin S
2006-01-01
Many healthcare professionals question whether the industry's hospitals and multi-site systems are implementing the necessary executive development and succession planning systems to ensure that high potential managers are prepared and aptly selected to assume key executive roles. Survey data, case studies, and cross-industry comparisons suggest that healthcare organizations may face a leadership crisis as the current generation of chief executive officers (CEOs) nears retirement while traditional means of developing the leadership pipeline, including middle-management positions and graduate programs requiring formal residencies, continue to dissipate. Given the daunting challenges that accompany the healthcare industry's quest to identify, develop, and retain leadership talent, this article provides best practice findings from a qualitative study of 13 healthcare organizations with a record of exemplary executive development and succession planning practices. CEOs from six single-site hospitals, six healthcare systems, and one medical group were interviewed to identify industry best practices so that healthcare practitioners and educators may utilize the findings to enhance the industry's leadership capacity.
On the Evolutionary Origins of Executive Functions
ERIC Educational Resources Information Center
Ardila, Alfredo
2008-01-01
In this paper it is proposed that the prefrontal lobe participates in two closely related but different executive function abilities: (1) "metacognitive executive functions": problem solving, planning, concept formation, strategy development and implementation, controlling attention, working memory, and the like; that is, executive functions as…
Executive Development: Key Factors for Success.
ERIC Educational Resources Information Center
Fenwick-Magrath, Julie A.
1988-01-01
Reports results from a survey of 12 leading corporations concerning their management of the executive development process. Indicates that involvement of the chief executive officer, a clear policy, a relationship between executive development and business strategies and objectives, annual succession planning, and management responsibility are key…
Integrated Planning for Telepresence with Time Delays
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Rabe, Kenneth J.
2006-01-01
Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša
2015-02-15
Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general;more » in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.« less
Lean-Six Sigma: tools for rapid cycle cost reduction.
Caldwell, Chip
2006-10-01
Organizational costs can be grouped as process cost, cost of quality, and cost of poor quality. Providers should train managers in the theory and application of Lean-Six Sigma, including the seven categories of waste and how to remove them. Healthcare financial executives should work with managers in eliminating waste to improve service and reduce costs.
40 CFR 62.8870 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Ohio Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8870 Identification of plan. The Ohio State Implementation Plan for implementing the Federal Municipal Solid Waste Landfill Emission Guidelines including...
40 CFR 62.3330 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Illinois Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.3330 Identification of plan. The Illinois Plan for implementing the Federal Municipal Solid Waste Landfill Emission Guidelines to control air...
SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vienna, John D.; Todd, Terry A.; Peterson, Mary E.
2012-11-26
This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.
Akulume, Martha; Kiwanuka, Suzanne N
2016-01-01
Objective . The goal of this study was to assess the appropriateness of the theory of planned behavior in predicting health care waste segregation behaviors and to examine the factors that influence waste segregation behaviors. Methodology . One hundred and sixty-three health workers completed a self-administered questionnaire in a cross-sectional survey that examined the theory of planned behavior constructs (attitudes, subjective norms, perceived behavioral control, and intention) and external variables (sociodemographic factors, personal characteristics, organizational characteristics, professional characteristics, and moral obligation). Results . For their most recent client 21.5% of the health workers reported that they most definitely segregated health care waste while 5.5% did not segregate. All the theory of planned behavior constructs were significant predictors of health workers' segregation behavior, but intention emerged as the strongest and most significant ( r = 0.524, P < 0.001). The theory of planned behavior model explained 52.5% of the variance in health workers' segregation behavior. When external variables were added, the new model explained 66.7% of the variance in behavior. Conclusion . Generally, health workers' health care waste segregation behavior was high. The theory of planned behavior significantly predicted health workers' health care waste segregation behaviors.
NASA Technical Reports Server (NTRS)
Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.
1996-01-01
This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.
5 CFR 2638.706 - Agency's written plan for annual ethics training.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...
5 CFR 2638.706 - Agency's written plan for annual ethics training.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...
5 CFR 2638.706 - Agency's written plan for annual ethics training.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...
5 CFR 2638.706 - Agency's written plan for annual ethics training.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...
5 CFR 2638.706 - Agency's written plan for annual ethics training.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...
40 CFR 62.1350 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Emissions from Existing Municipal Solid Waste Landfills § 62.1350 Identification of plan. “111(d) Plan for Existing Municipal Solid Waste Landfills Existing in Colorado” and the associated State regulations in Part...
40 CFR 60.1380 - What must I include in my notice of construction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...
40 CFR 60.1380 - What must I include in my notice of construction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...
40 CFR 60.1380 - What must I include in my notice of construction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...
40 CFR 60.1380 - What must I include in my notice of construction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...
40 CFR 60.1380 - What must I include in my notice of construction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...
16 CFR 1000.18 - Office of Executive Director.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Executive Director. 1000.18... AND FUNCTIONS § 1000.18 Office of Executive Director. The Executive Director with the assistance of... offices: the Office of Financial Management, Planning and Evaluation, the Office of Hazard Identification...
Medical waste management plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lane, Todd W.; VanderNoot, Victoria A.
2004-12-01
This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2014 CFR
2014-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2013 CFR
2013-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?
Code of Federal Regulations, 2014 CFR
2014-07-01
... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE... facility. You must design the plan to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE... facility. You must design the plan to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?
Code of Federal Regulations, 2013 CFR
2013-07-01
... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE... facility. You must design the plan to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 267.51 - What is the purpose of the contingency plan and how do I use it?
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE... facility. You must design the plan to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...
40 CFR 60.1550 - What municipal waste combustion units must I address in my State plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What municipal waste combustion units... Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Applicability of State Plans § 60.1550 What municipal waste combustion units must...
40 CFR 60.1550 - What municipal waste combustion units must I address in my State plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What municipal waste combustion units... Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Applicability of State Plans § 60.1550 What municipal waste combustion units must...
40 CFR 60.1550 - What municipal waste combustion units must I address in my State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What municipal waste combustion units... Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Applicability of State Plans § 60.1550 What municipal waste combustion units must...
40 CFR 60.1550 - What municipal waste combustion units must I address in my State plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What municipal waste combustion units... Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Applicability of State Plans § 60.1550 What municipal waste combustion units must...
40 CFR 60.1550 - What municipal waste combustion units must I address in my State plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What municipal waste combustion units... Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Applicability of State Plans § 60.1550 What municipal waste combustion units must...
40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... alternative waste treatment technology before you shut down your CISWI (1) Date when you will enter into a... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...
40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... alternative waste treatment technology before you shut down your CISWI (1) Date when you will enter into a... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
Model-Unified Planning and Execution for Distributed Autonomous System Control
NASA Technical Reports Server (NTRS)
Aschwanden, Pascal; Baskaran, Vijay; Bernardini, Sara; Fry, Chuck; Moreno, Maria; Muscettola, Nicola; Plaunt, Chris; Rijsman, David; Tompkins, Paul
2006-01-01
The Intelligent Distributed Execution Architecture (IDEA) is a real-time architecture that exploits artificial intelligence planning as the core reasoning engine for interacting autonomous agents. Rather than enforcing separate deliberation and execution layers, IDEA unifies them under a single planning technology. Deliberative and reactive planners reason about and act according to a single representation of the past, present and future domain state. The domain state behaves the rules dictated by a declarative model of the subsystem to be controlled, internal processes of the IDEA controller, and interactions with other agents. We present IDEA concepts - modeling, the IDEA core architecture, the unification of deliberation and reaction under planning - and illustrate its use in a simple example. Finally, we present several real-world applications of IDEA, and compare IDEA to other high-level control approaches.
NASA Technical Reports Server (NTRS)
Hughes, John; Marius, Julio L.; Montoro, Manuel; Patel, Mehul; Bludworth, David
2006-01-01
This Paper is a case study of the development and execution of the End-of-Mission plans for the Earth Radiation Budget Satellite (ERBS) and the Upper Atmosphere Research Satellite (UARS). The goals of the End-of-Mission Plans are to minimize the time the spacecraft remains on orbit and to minimize the risk of creating orbital debris. Both of these Missions predate the NASA Management Instructions (NMI) that directs missions to provide for safe mission termination. Each spacecrafts had their own unique challenges, which required assessing End-of-Mission requirements versus spacecraft limitations. Ultimately the End-of- Mission operations were about risk mitigation. This paper will describe the operational challenges and the lessons learned executing these End-of-Mission Plans
NASA Technical Reports Server (NTRS)
1981-01-01
Space systems concepts were identified and defined and evaluated as to their performance, risks, and technical viability in order to select the most attractive approach for disposal of high level nuclear wastes in space. Major study areas discussed include: (1) mission and operations analysis; (2) waste payload systems; (3) flight support system; (4) launch site systems; (5) launch vehicle systems; (6) orbit transfer system; (7) space disposal destinations; and (8) systems integration and evaluation.
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the wastes, application of advanced technology, or alternative disposal, treatment, or re-use.... 265.118 Section 265.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...
40 CFR 62.650 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Existing Commercial/industrial Solid Waste Incineration Units § 62.650 Identification of plan. (a) The... are no existing commercial/industrial solid waste incineration units within the Department's.../industrial solid waste incineration units within the Department's jurisdiction that are subject to 40 CFR...
40 CFR 62.650 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Existing Commercial/industrial Solid Waste Incineration Units § 62.650 Identification of plan. (a) The... are no existing commercial/industrial solid waste incineration units within the Department's.../industrial solid waste incineration units within the Department's jurisdiction that are subject to 40 CFR...
3 Steps to Developing a Tribal Integrated Waste Management Plan (IWMP)
An Integrated Waste Management Plan (IWMP) is the blueprint of a comprehensive waste management program. The steps to developing an IWMP are collect background data, map out the tribal IWMP framework, and write and implement the tribal IWMP.
Program Planning Concepts in Solid Waste Management
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1972-01-01
Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Transaction Exemption 98-54 Relating to Certain Employee Benefit Plan Foreign Exchange Transactions Executed..., ``Prohibited Transaction Exemption 98-54 Relating to Certain Employee Benefit Plan Foreign Exchange Transactions Executed Pursuant to Standing Instructions,'' to the Office of Management and Budget (OMB) for...
Building Software Agents for Planning, Monitoring, and Optimizing Travel
2004-01-01
defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities
A science-based executive for autonomous planetary vehicles
NASA Technical Reports Server (NTRS)
Peters, S.
2001-01-01
If requests for scientific observations, rather than specific plans, are uplinked to an autonomous execution system on the vehicle, it would be able to adjust its execution based upon actual performance. Such a science-based executive control system had been developed and demonstrated for the Rocky7 research rover.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, K.A.; Mitchell, M.M.; Jean, D.
1997-09-01
This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... October 4, 2004. (2) You must submit a waste management plan no later than April 5, 2004. (3) You must...
40 CFR 62.1350 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Colorado Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.1350 Identification of plan. “111(d) Plan for Existing Municipal Solid Waste Landfills Existing in Colorado” and the associated State regulations in Part...
40 CFR 62.6600 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Montana Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.6600 Identification of plan. “Section 111(d) Plan for Municipal Solid Waste Landfills” and the associated State regulations in sections 17.8.302(1...
40 CFR 62.3630 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Indiana Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.3630 Identification of plan. “Section 111(d) Plan for Municipal Solid Waste Landfills” and the associated State regulations found in Title 326: Air...
Advancing Autonomous Operations for Deep Space Vehicles
NASA Technical Reports Server (NTRS)
Haddock, Angie T.; Stetson, Howard K.
2014-01-01
Starting in Jan 2012, the Advanced Exploration Systems (AES) Autonomous Mission Operations (AMO) Project began to investigate the ability to create and execute "single button" crew initiated autonomous activities [1]. NASA Marshall Space Flight Center (MSFC) designed and built a fluid transfer hardware test-bed to use as a sub-system target for the investigations of intelligent procedures that would command and control a fluid transfer test-bed, would perform self-monitoring during fluid transfers, detect anomalies and faults, isolate the fault and recover the procedures function that was being executed, all without operator intervention. In addition to the development of intelligent procedures, the team is also exploring various methods for autonomous activity execution where a planned timeline of activities are executed autonomously and also the initial analysis of crew procedure development. This paper will detail the development of intelligent procedures for the NASA MSFC Autonomous Fluid Transfer System (AFTS) as well as the autonomous plan execution capabilities being investigated. Manned deep space missions, with extreme communication delays with Earth based assets, presents significant challenges for what the on-board procedure content will encompass as well as the planned execution of the procedures.
Integrating planning and reactive control
NASA Technical Reports Server (NTRS)
Wilkins, David E.; Myers, Karen L.
1994-01-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
Integrating planning and reactive control
NASA Astrophysics Data System (ADS)
Wilkins, David E.; Myers, Karen L.
1994-10-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVEGRADE ...
29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVE-GRADE FLOOR LEVEL. INEEL DRAWING NUMBER 200-0633-00-287-106354. FLUOR NUMBER 5775-CPP-633-A-4. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
40 CFR 62.13106 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Control of Air Emissions of Designated Pollutants from Existing Hospital, Medical, and Infectious Waste.../Infectious Waste Incinerators. (b) Identification of sources: The plan applies to all applicable existing hospital/medical/infectious waste incinerators for which construction commenced on or before June 20, 1996...
40 CFR 62.8354 - Identification of plan-negative declaration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... North Carolina Air Emissions from Commercial and Industrial Solid Waste Incineration Units § 62.8354..., certifying that there are no Commercial and Industrial Solid Waste Incineration units subject to 40 CFR part... Waste Incineration (CISWI) Units—Section 111(d)/129 Plan ...
40 CFR 62.10629 - Identification of plan-negative declaration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Tennessee Air Emissions from Commercial and Industrial Solid Waste Incineration Units § 62.10629..., respectively, certifying that there are no Commercial and Industrial Solid Waste Incineration units subject to... Industrial Solid Waste Incineration (CISWI) Units—Section 111(d)/129 Plan ...
40 CFR 62.10629 - Identification of plan-negative declaration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS Tennessee Air Emissions from Commercial and Industrial Solid Waste Incineration Units § 62.10629..., respectively, certifying that there are no Commercial and Industrial Solid Waste Incineration units subject to... Industrial Solid Waste Incineration (CISWI) Units—Section 111(d)/129 Plan ...
40 CFR 62.8354 - Identification of plan-negative declaration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... North Carolina Air Emissions from Commercial and Industrial Solid Waste Incineration Units § 62.8354..., certifying that there are no Commercial and Industrial Solid Waste Incineration units subject to 40 CFR part... Waste Incineration (CISWI) Units—Section 111(d)/129 Plan ...
40 CFR 62.5150 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.5150 Identification of..., Emissions Guidelines for Municipal Solid Waste Landfills. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.
This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
...-9460. 4. Mail: Steven Brown, Atmospheric Section, Air Planning and Development Branch, Air and Waste..., Kansas 66101. 5. Hand Delivery or Courier: Steven Brown, Atmospheric Section, Air Planning and... Atmospheric Section, Air Planning and Development Branch, Air Waste and Management Division, U.S...
40 CFR 62.8600 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Dakota Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8600 Identification of plan. “Section 111(d) Plan for Municipal Solid Waste Landfills” and the associated State regulation in section 33-15-12-02 of...
40 CFR 62.8104 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS New York Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8104 Identification of plan. (a) The New York... Municipal Solid Waste Landfills” on October 8, 1998. (b) Identification of sources: The plan applies to all...
40 CFR 62.5860 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Minnesota Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.5860 Identification of plan. “Section 111(d) Plan for Municipal Solid Waste Landfills,” submitted by the State on March 4, 1997. [63 FR 40052, July...
Solid Waste Management Planning--A Methodology
ERIC Educational Resources Information Center
Theisen, Hilary M.; And Others
1975-01-01
This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)
ERIC Educational Resources Information Center
Fomin, Eugene P.; Alekseev, Audrey A.; Fomina, Natalia E.; Dorozhkin, Vladimir E.
2016-01-01
The article illustrates a theoretical approach to scenario modeling of economic indicators of regional waste management system. The method includes a three-iterative algorithm that allows the executive authorities and investors to take a decision on logistics, bulk, technological and economic parameters of the formation of the regional long-term…
NASA Technical Reports Server (NTRS)
Parrish, Clyde F.; Barile, Ronald G.; Gamble, Paul H.; Lueck, Dale E.; Young, Rebecca C.
1995-01-01
A new emissions control system for the oxidizer scrubbers that eliminates the current oxidizer liquor waste and lowers the NO(x) emissions is described. Since fueling and deservicing spacecraft constitute the primary operations in which environmental emissions occur, this will eliminate the second largest waste stream at KSC. This effort is in accord with Executive Order No. 12856 (Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements, data 6 Aug. 1993) and Executive Order No. 12873 (Federal Acquisition, Recycling, and Waste Prevention, dated 20 Oct. 1993). A recent study found that the efficiencies of the oxidizer scrubbers during normal operations ranged from 70 percent to 99 percent. The new scrubber liquor starts with 1% hydrogen peroxide at a pH of 7 and the process control system adds hydrogen peroxide and potassium hydroxide to the scrubber liquor to maintain those initial conditions. The result is the formation of a solution of potassium nitrate, which is sold as a fertilizer. This report describes the equipment and procedures used to monitor and control the conversion of the scrubber liquor to fertilizer, while reducing the scrubber emissions.
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
Planning and Execution for an Autonomous Aerobot
NASA Technical Reports Server (NTRS)
Gaines, Daniel M.; Estlin, Tara A.; Schaffer, Steven R.; Chouinard, Caroline M.
2010-01-01
The Aerial Onboard Autonomous Science Investigation System (AerOASIS) system provides autonomous planning and execution capabilities for aerial vehicles (see figure). The system is capable of generating high-quality operations plans that integrate observation requests from ground planning teams, as well as opportunistic science events detected onboard the vehicle while respecting mission and resource constraints. AerOASIS allows an airborne planetary exploration vehicle to summarize and prioritize the most scientifically relevant data; identify and select high-value science sites for additional investigation; and dynamically plan, schedule, and monitor the various science activities being performed, even during extended communications blackout periods with Earth.
Gender and rapid alterations of hemispheric dominance during planning.
Schuepbach, Daniel; Skotchko, Tatjana; Duschek, Stefan; Theodoridou, Anastasia; Grimm, Simone; Boeker, Heinz; Seifritz, Erich
2012-01-01
Mental planning and carrying out a plan provoke specific cerebral hemodynamic responses. Gender aspects of hemispheric laterality using rapid cerebral hemodynamics have not been reported. Here, we applied functional transcranial Doppler sonography to examine lateralization of cerebral hemodynamics of the middle cerebral arteries of 28 subjects (14 women and 14 men) performing a standard planning task. There were easy and difficult problems, and mental planning without motor activity was separated from movement execution. Difficult mental planning elicited lateralization to the right hemisphere after 2 or more seconds, a feature that was not observed during movement execution. In females, there was a dominance to the left hemisphere during movement execution. Optimized problem solving yielded an increased laterality change to the right during mental planning. Gender-related hemispheric dominance appears to be condition-dependent, and change of laterality to the right may play a role in optimized performance. Results are of relevance when considering laterality from a perspective of performance enhancement of higher cognitive functions, and also of psychiatric disorders with cognitive dysfunctions and abnormal lateralization patterns such as schizophrenia. Copyright © 2012 S. Karger AG, Basel.
40 CFR 62.8602 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Dakota Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8602 Effective date. The effective date of the plan for municipal solid waste landfills is February 13, 1998. Air Emissions From Hospital/Medical/Infectious Waste...
31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR ...
31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR AT MEZZANINE AND LOWER LEVELS. INEEL DRAWING NUMBER 200-0633-00-287-106352. FLUOR NUMBER 5775-CPP-633-A-2. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
40 CFR 62.14620 - What site-specific documentation is required?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Procedures for receiving, handling, and charging waste. (3) Incinerator startup, shutdown, and malfunction... limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan required under §§ 62...
Tank waste remediation system tank waste retrieval risk management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klimper, S.C.
1997-11-07
This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.
Stop making plans; start making decisions.
Mankins, Michael C; Steele, Richard
2006-01-01
Many executives have grown skeptical of strategic planning. Is it any wonder? Despite all the time and energy that go into it, strategic planning most often acts as a barrier to good decision making and does little to influence strategy. Strategic planning fails because of two factors: It typically occurs annually, and it focuses on individual business units. As such, the process is completely at odds with the way executives actually make important strategy decisions, which are neither constrained by the calendar nor defined by unit boundaries. Thus, according to a survey of 156 large companies, senior executives often make strategic decisions outside the planning process, in an ad hoc fashion and without rigorous analysis or productive debate. But companies can fix the process if they attack its root problems. A few forward-looking firms have thrown out their calendar-driven, business-unit-focused planning procedures and replaced them with continuous, issues-focused decision making. In doing so, they rely on several basic principles: They separate, but integrate, decision making and plan making. They focus on a few key themes. And they structure strategy reviews to produce real decisions. When companies change the timing and focus of strategic planning, they also change the nature of senior management's discussions about strategy--from "review and approve" to "debate and decide," in which top executives actively think through every major decision and its implications for the company's performance and value. The authors have found that these companies make more than twice as many important strategic decisions per year as companies that follow the traditional planning model.
Execution monitoring for a mobile robot system
NASA Technical Reports Server (NTRS)
Miller, David P.
1990-01-01
Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.
77 FR 6790 - Environmental Management Site-Specific Advisory Board, Portsmouth
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
.... Federal Coordinator's Comments. Liaisons' Comments. Presentations: [cir] The Ohio Valley Regional Development Center (OVRDC) Overview, John Hemmings, Executive Director of OVRDC. [cir] Waste Acceptance...
ERIC Educational Resources Information Center
Huyser, Chaim; Veltman, Dick J.; Wolters, Lidewij H.; de Haan, Else; Boer, Frits
2010-01-01
Objective: Pediatric obsessive compulsive disorder (OCD) has been associated with cognitive abnormalities, in particular executive impairments, and dysfunction of frontal-striatal-thalamic circuitry. The aim of this study was to investigate if planning as an executive function is compromised in pediatric OCD and is associated with…
ERIC Educational Resources Information Center
Jackson, LeKeisha D.
2017-01-01
Guided by the research questions, this study utilized a sequential explanatory mixed methods research design to examine senior executive leadership succession planning at four-year, predominately white, doctoral universities in the state of Georgia. Utilizing the Representative Bureaucracy theory and the Mateso SPM conceptual model, this study…
Autonomous mission management for UAVs using soar intelligent agents
NASA Astrophysics Data System (ADS)
Gunetti, Paolo; Thompson, Haydn; Dodd, Tony
2013-05-01
State-of-the-art unmanned aerial vehicles (UAVs) are typically able to autonomously execute a pre-planned mission. However, UAVs usually fly in a very dynamic environment which requires dynamic changes to the flight plan; this mission management activity is usually tasked to human supervision. Within this article, a software system that autonomously accomplishes the mission management task for a UAV will be proposed. The system is based on a set of theoretical concepts which allow the description of a flight plan and implemented using a combination of Soar intelligent agents and traditional control techniques. The system is capable of automatically generating and then executing an entire flight plan after being assigned a set of objectives. This article thoroughly describes all system components and then presents the results of tests that were executed using a realistic simulation environment.
Patient Autonomy for the Management of Chronic Conditions: A Two-Component Re-conceptualization
Naik, Aanand D.; Dyer, Carmel B.; Kunik, Mark E.; McCullough, Laurence B.
2010-01-01
The clinical application of the concept of patient autonomy has centered on the ability to deliberate and make treatment decisions (decisional autonomy) to the virtual exclusion of the capacity to execute the treatment plan (executive autonomy). However, the one-component concept of autonomy is problematic in the context of multiple chronic conditions. Adherence to complex treatments commonly breaks down when patients have functional, educational, and cognitive barriers that impair their capacity to plan, sequence, and carry out tasks associated with chronic care. The purpose of this article is to call for a two-component re-conceptualization of autonomy and to argue that the clinical assessment of capacity for patients with chronic conditions should be expanded to include both autonomous decision making and autonomous execution of the agreed-upon treatment plan. We explain how the concept of autonomy should be expanded to include both decisional and executive autonomy, describe the biopsychosocial correlates of the two-component concept of autonomy, and recommend diagnostic and treatment strategies to support patients with deficits in executive autonomy. PMID:19180389
30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE ...
30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE GRADE AND AT LEVEL OF OPERATING CORRIDOR. INEEL DRAWING NUMBER 200-0633-00-287-106351. FLUOR NUMBER 5775-CPP-633-A-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
37. PLAN OF ACCESS CORRIDOR PIPING INCLUDES WASTE HOLD TANK ...
37. PLAN OF ACCESS CORRIDOR PIPING INCLUDES WASTE HOLD TANK CELL, OFFGAS CELL, ADSORBER CELL, AND OFFGAS FILTER CELL. INEEL DRAWING NUMBER 200-0633-00-287-106453. FLUOR NUMBER 5775-CPP-P-58. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
75 FR 29786 - Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... plans for managing spent nuclear fuel and high-level radioactive waste. Pursuant to its authority under... of Energy (DOE) plans for managing spent nuclear fuel (SNF) and high-level radioactive waste (HLW... the packaging and movement of the waste, how the recent decision to terminate the Yucca Mountain...
40 CFR 62.13108 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Industrial Solid Waste Incineration Units. The State Plan includes revisions to Rule 102 and Rule 405 of the... Industrial Solid Waste Incineration Units for which construction commenced on or before November 30, 1999... Control of Air Emissions of Designated Pollutants from Existing Commercial and Industrial Solid Waste...
Code of Federal Regulations, 2013 CFR
2013-07-01
... close my municipal waste combustion unit and not restart it? 60.1640 Section 60.1640 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If you...
Code of Federal Regulations, 2012 CFR
2012-07-01
... close my municipal waste combustion unit and not restart it? 60.1640 Section 60.1640 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If you...
Code of Federal Regulations, 2014 CFR
2014-07-01
... close my municipal waste combustion unit and not restart it? 60.1640 Section 60.1640 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If you...
Code of Federal Regulations, 2011 CFR
2011-07-01
... close my municipal waste combustion unit and not restart it? 60.1640 Section 60.1640 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If you...
Code of Federal Regulations, 2010 CFR
2010-07-01
... close my municipal waste combustion unit and not restart it? 60.1640 Section 60.1640 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If you...
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC.
The purpose of this guide is to educate young people about the problems associated with solid waste. The activities encourage them to think about options for reducing the amount of waste they generate and how they can help by recycling and learning about other waste management alternatives. The lesson plans deal specifically with garbage and…
Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor
2014-01-01
Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication.
Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor
2014-01-01
Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication. PMID:25249999
Medium term municipal solid waste generation prediction by autoregressive integrated moving average
DOE Office of Scientific and Technical Information (OSTI.GOV)
Younes, Mohammad K.; Nopiah, Z. M.; Basri, Noor Ezlin A.
2014-09-12
Generally, solid waste handling and management are performed by municipality or local authority. In most of developing countries, local authorities suffer from serious solid waste management (SWM) problems and insufficient data and strategic planning. Thus it is important to develop robust solid waste generation forecasting model. It helps to proper manage the generated solid waste and to develop future plan based on relatively accurate figures. In Malaysia, solid waste generation rate increases rapidly due to the population growth and new consumption trends that characterize the modern life style. This paper aims to develop monthly solid waste forecasting model using Autoregressivemore » Integrated Moving Average (ARIMA), such model is applicable even though there is lack of data and will help the municipality properly establish the annual service plan. The results show that ARIMA (6,1,0) model predicts monthly municipal solid waste generation with root mean square error equals to 0.0952 and the model forecast residuals are within accepted 95% confident interval.« less
Medium term municipal solid waste generation prediction by autoregressive integrated moving average
NASA Astrophysics Data System (ADS)
Younes, Mohammad K.; Nopiah, Z. M.; Basri, Noor Ezlin A.; Basri, Hassan
2014-09-01
Generally, solid waste handling and management are performed by municipality or local authority. In most of developing countries, local authorities suffer from serious solid waste management (SWM) problems and insufficient data and strategic planning. Thus it is important to develop robust solid waste generation forecasting model. It helps to proper manage the generated solid waste and to develop future plan based on relatively accurate figures. In Malaysia, solid waste generation rate increases rapidly due to the population growth and new consumption trends that characterize the modern life style. This paper aims to develop monthly solid waste forecasting model using Autoregressive Integrated Moving Average (ARIMA), such model is applicable even though there is lack of data and will help the municipality properly establish the annual service plan. The results show that ARIMA (6,1,0) model predicts monthly municipal solid waste generation with root mean square error equals to 0.0952 and the model forecast residuals are within accepted 95% confident interval.
Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dickerson, L.S.
1988-05-01
The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Quality Plans for Designated Facilities and Pollutants, State of Iowa; Control of Emissions From Existing Hospital/ Medical/Infectious Waste Incinerator Units, Negative Declaration and 111(d) Plan Rescission... declaration and withdrawal of its section 111(d)/129 plan for Hospital Medical Infectious Waste Incinerators...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cherry, Mark; Lojek, Dave; Murphy, Con
2003-02-23
Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project ismore » now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw, labor un ions, and the local community in creating and executing a successful project.« less
Federal Facilities (Executive Offices) Sector (NAICS 921110)
Find EPA regulatory information for federal facilities (NAICS 92), including information on base closures and transfers, hazardous waste, military munitions, perchorlate, environmentally preferable purchasing and comprehensive procurement guidelines
Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015more » and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.« less
TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BURBANK, D.A.
This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
.../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...
40 CFR 62.4845 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (LVHC) systems, steam strippers, and waste water treatment plants. Changes have also been made to... municipal waste combustors, submitted on April 15, 1998. (5) A revision to the plan controlling TRS from.... (3) Existing municipal waste combustors. [54 FR 22896, May 30, 1989, as amended at 55 FR 38548, Sept...
40 CFR 62.4845 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (LVHC) systems, steam strippers, and waste water treatment plants. Changes have also been made to... municipal waste combustors, submitted on April 15, 1998. (5) A revision to the plan controlling TRS from.... (3) Existing municipal waste combustors. [54 FR 22896, May 30, 1989, as amended at 55 FR 38548, Sept...
40 CFR 62.14350 - Scope and delegation of authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...
40 CFR 62.14350 - Scope and delegation of authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...
40 CFR 62.14770 - When must I achieve final compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...
40 CFR 62.14770 - When must I achieve final compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...
40 CFR 62.14350 - Scope and delegation of authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...
40 CFR 62.14770 - When must I achieve final compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...
40 CFR 60.1050 - Who must submit a materials separation plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...
40 CFR 62.14770 - When must I achieve final compliance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...
40 CFR 60.1050 - Who must submit a materials separation plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...
40 CFR 62.14770 - When must I achieve final compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...
Corporate objectives and the planning process.
White, S
1990-02-01
The embodiment of corporate objectives in a workable planning process enables all employees to develop an identity larger than themselves. This results in a more cohesive body and makes it easier to implement the organization's strategy and mission. The senior executives at University Hospital have a long history with the organization and therefore know it well. Whether the new process makes planning more coordinated and comprehensive will be measured by both the subjective and the objective assessment of these executives.
7 CFR 1700.30 - Water and Environmental Programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... policies for the effective, efficient, and orderly management of Water and Environmental Programs responsibilities; provides leadership to ensure execution of policies and procedures by the Water and Waste...
SCORE/ACE Counselor Handbook. Service Corps of Retired Executives. Active Corps of Executives.
ERIC Educational Resources Information Center
Landsverk, Arvel; And Others
This counselor handbook is intended to help Service Corps of Retired Executives/Active Corps of Executives (SCORE/ACE) counselors to plan and conduct counseling services more effectively. Included in the introductory section are an overview of the SCORE/ACE counseling program, a discussion of what the counselor does, directions for completing…
Odlaug, Brian L.; Hampshire, Adam; Chamberlain, Samuel R.; Grant, Jon E.
2016-01-01
Background Excoriation (skin-picking) disorder (SPD) is a relatively common psychiatric condition whose neurobiological basis is unknown. Aims To probe the function of fronto-striatal circuitry in SPD. Method Eighteen participants with SPD and 15 matched healthy controls undertook an executive planning task (Tower of London) during functional magnetic resonance imaging (fMRI). Activation during planning was compared between groups using region of interest and whole-brain permutation cluster approaches. Results The SPD group exhibited significant functional underactivation in a cluster encompassing bilateral dorsal striatum (maximal in right caudate), bilateral anterior cingulate and right medial frontal regions. These abnormalities were, for the most part, outside the dorsal planning network typically activated by executive planning tasks. Conclusions Abnormalities of neural regions involved in habit formation, action monitoring and inhibition appear involved in the pathophysiology of SPD. Implications exist for understanding the basis of excessive grooming and the relationship of SPD with putative obsessive–compulsive spectrum disorders. PMID:26159604
100-D Ponds closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petersen, S.W.
1997-09-01
The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less
1982-12-13
In response to Executive Order 12291 and the President's Task Force on Regulatory Relief, the Environmental Protection Agency is reviewing and reassessing the hazardous waste regulations developed under the Resource Conservation and Recovery Act (RCRA). A variety of activities are underway that will simplify procedures and reduce paperwork, modify existing regulations to make them more workable and cost effective, and control new wastes and new processes. The purpose of this notice is to inform the public of these activities and invite comments on the general approaches being taken.
1981-07-01
Disposal Methods 4-31 Evaluation of Past and Present Waste 4-35 Disposal Facilities Landfills 4-35 Dry Wells 4-37 Rating of Waste Disposal Sites 4-37 V 2...Problems Identified at GAPE Landfills 4-36 4.12 Priority Ranking of Potential 4-38 Contamination Sources 4.13 -4.31 Rating Forms for Waste Disposal Sites 4...39 -4-76 5.1 Priority Ranking of Potential Con- 5-2 tamination Sources B.1 Rating Factor System B-2 -B-5 4W EXECUTIVE SUMMARY The Resource
Code of Federal Regulations, 2013 CFR
2013-07-01
... close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not..., 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood...
Code of Federal Regulations, 2012 CFR
2012-07-01
... close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not..., 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood...
Code of Federal Regulations, 2014 CFR
2014-07-01
... close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not..., 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood...
Code of Federal Regulations, 2010 CFR
2010-07-01
... close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not..., 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood...
Code of Federal Regulations, 2011 CFR
2011-07-01
... close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not..., 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.3065 What must I do if I plan to permanently close my air curtain incinerator that burns only wood...
ERIC Educational Resources Information Center
Simatwa, Enose M. W.
2010-01-01
Instructional management focuses on planning, execution and evaluation of learning experiences. For teachers in pre-secondary schools to plan, execute and evaluate learning experiences effectively, they need to have good understanding of the process of cognitive development in children. Piaget has postulated that children progress through a series…
2016-10-06
Copyright 2016, Compsim, All Rights Reserved 1 KEEL® Technology in support of Mission Planning and Execution delivering Adaptive...Executing, and Auditing ) This paper focuses on the decision-making component (#2) with the use of Knowledge Enhanced Electronic logic (KEEL) Technology ...Copyright 2016, Compsim, All Rights Reserved 2 • Eliminate “coding errors” (auto-generated code) • 100% explainable and auditable
ERIC Educational Resources Information Center
Smith-Daniels, Dwight E.; Smith-Daniels, Vicki L.
2008-01-01
The ability to plan and execute projects is a fundamental skill required among managers and business school graduates. In the opening phase of a project, the project team makes decisions about the relative priority of project time, cost, and performance objectives, oftentimes without complete information about customer and stakeholder…
Drabek, T E
1992-06-01
Data obtained from 65 executives working for tourism firms in three sample communities permitted comparison with the public warning response literature regarding three topics: disaster evacuation planning, initial warning responses, and disaster evacuation behavior. Disaster evacuation planning was reported by nearly all of these business executives, although it was highly variable in content, completeness, and formality. Managerial responses to post-disaster warnings paralleled the type of complex social processes that have been documented within the public response literature, except that warning sources and confirmation behavior were significantly affected by contact with authorities. Five key areas of difference were discovered in disaster evacuation behavior pertaining to: influence of planning, firm versus family priorities, shelter selection, looting concerns, and media contacts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schubert, A.L.
2013-07-01
On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will havemore » been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)« less
40 CFR 68.155 - Executive summary.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Executive summary. 68.155 Section 68.155 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.155 Executive summary. The owner or...
40 CFR 68.155 - Executive summary.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Executive summary. 68.155 Section 68.155 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.155 Executive summary. The owner or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, Jack C.P., E-mail: cejcheng@ust.hk; Ma, Lauren Y.H., E-mail: yingzi@ust.hk
Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R wastemore » disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.« less
Amey, E.B.; Russell, J.A.; Hurdelbrink, R.J.
1996-01-01
In 1976, the U.S. Congress enacted the Resource Conservation and Recovery Act (RCRA) to further address the problem of increasing industrial and municipal waste. The main objectives of RCRA were to responsibly manage hazardous and solid waste and to procure materials made from recovered wastes. To fulfill these objectives, four main programs of waste management were developed. These programs were defined under Subtitle C, the Hazardous Waste Program; Subtitle D, the Solid Waste Program; Subtitle I, the Underground Storage Tank Program; and Subtitle J, the Medical Waste Program. Subtitle D illustrates the solid waste dilemma occurring in the United States. Under this program, states are encouraged to develop and implement their own waste management plans. These plans include the promotion of recycling solid wastes and the closing and upgrading of all environmentally unsound dumps. ?? 1996 International Association for Mathematical Geology.
40 CFR 62.5152 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.5152 Effective date. The effective date of the plan for municipal solid waste landfills is November 8, 1999. Emissions From Existing Hospital...
40 CFR 62.1952 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Delaware Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.1952 Effective date. The effective date of the plan for municipal solid waste landfills is November 16, 1999. Emissions From Existing...
30 CFR 784.23 - Operation plan: Maps and plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste storage area; (6) Each water diversion, collection, conveyance, treatment, storage and discharge... structure, permanent water impoundment, refuse pile, and coal mine waste impoundment for which plans are...; (12) Location of each water and subsidence monitoring point; (13) Location of each facility that will...
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
VIPER: Virtual Intelligent Planetary Exploration Rover
NASA Technical Reports Server (NTRS)
Edwards, Laurence; Flueckiger, Lorenzo; Nguyen, Laurent; Washington, Richard
2001-01-01
Simulation and visualization of rover behavior are critical capabilities for scientists and rover operators to construct, test, and validate plans for commanding a remote rover. The VIPER system links these capabilities. using a high-fidelity virtual-reality (VR) environment. a kinematically accurate simulator, and a flexible plan executive to allow users to simulate and visualize possible execution outcomes of a plan under development. This work is part of a larger vision of a science-centered rover control environment, where a scientist may inspect and explore the environment via VR tools, specify science goals, and visualize the expected and actual behavior of the remote rover. The VIPER system is constructed from three generic systems, linked together via a minimal amount of customization into the integrated system. The complete system points out the power of combining plan execution, simulation, and visualization for envisioning rover behavior; it also demonstrates the utility of developing generic technologies. which can be combined in novel and useful ways.
Defense Waste Processing Facility Canister Closure Weld Current Validation Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Korinko, P. S.; Maxwell, D. N.
Two closure welds on filled Defense Waste Processing Facility (DWPF) canisters failed to be within the acceptance criteria in the DWPF operating procedure SW4-15.80-2.3 (1). In one case, the weld heat setting was inadvertently provided to the canister at the value used for test welds (i.e., 72%) and this oversight produced a weld at a current of nominally 210 kA compared to the operating procedure range (i.e., 82%) of 240 kA to 263 kA. The second weld appeared to experience an instrumentation and data acquisition upset. The current for this weld was reported as 191 kA. Review of the datamore » from the Data Acquisition System (DAS) indicated that three of the four current legs were reading the expected values, approximately 62 kA each, and the fourth leg read zero current. Since there is no feasible way by further examination of the process data to ascertain if this weld was actually welded at either the target current or the lower current, a test plan was executed to provide assurance that these Nonconforming Welds (NCWs) meet the requirements for strength and leak tightness. Acceptance of the welds is based on evaluation of Test Nozzle Welds (TNW) made specifically for comparison. The TNW were nondestructively and destructively evaluated for plug height, heat tint, ultrasonic testing (UT) for bond length and ultrasonic volumetric examination for weld defects, burst pressure, fractography, and metallography. The testing was conducted in agreement with a Task Technical and Quality Assurance Plan (TTQAP) (2) and applicable procedures.« less
40 CFR 60.2630 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.2630 Section 60.2630 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass...
40 CFR 62.14590 - What should I include in my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What should I include in my waste management plan? 62.14590 Section 62.14590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the...
40 CFR 62.14590 - What should I include in my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What should I include in my waste management plan? 62.14590 Section 62.14590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the...
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass...
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or...
40 CFR 62.14590 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What should I include in my waste management plan? 62.14590 Section 62.14590 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass...
40 CFR 60.2630 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.2630 Section 60.2630 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the use...
40 CFR 62.14471 - When must I comply with this subpart if I plan to shut down?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators... documentation must include an evaluation of the option to transport your waste offsite to a commercial medical... an onsite alternative waste treatment technology before you shut down your HMIWI, Date when you will...
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2012 CFR
2012-07-01
....05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
2004-02-09
FINAL 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE VIRTUAL COLLABORATION: 5a. CONTRACT NUMBER ADVANTAGES AND DISADVANTAGES IN THE PLANNING AND...warfare is not one system; it is a system of systems from sensors to information flow. In analyzing the specific advantages and disadvantages of one of...Standard Form 298 (Rev. 8-98) NAVAL WAR COLLEGE Newport, R.I. VIRTUAL COLLABORATION: ADVANTAGES AND DISADVANTAGES IN THE PLANNING AND EXECUTION OF OPERATIONS
40 CFR 62.7100 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Nevada Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.7100 Identification of plan. (a) The Washoe... municipal solid waste landfills in Washoe County subject to 40 CFR part 60, subpart Cc. (b) The Nevada...
40 CFR 62.9632 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Pennsylvania Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.9632 Effective date. The effective date of the plan for municipal solid waste landfills is April 16, 1999. [64 FR 13078, Mar. 17, 1999] ...
The language of business: a key nurse executive competency.
Thomas, Joan; Collins, Allison; Collins, Denton; Herrin, Donna; Dafferner, Deborah; Gabriel, Julie
2008-01-01
The ability to interpret fiscal data pertaining to patient outcomes, human resources, customer satisfaction, and financial positions is a vital evidenced-based nurse executive competency. The ability of nurse leaders to influence and contribute in health system executive decision making requires fluency in accounting, "the language of business." After examining challenges faced by nurse executives, faculty at the Loewenberg School of Nursing at the University of Memphis integrated intensive accounting education into a new executive MSN program. Woven throughout the management accounting course is the concept that accounting data must be relevant and accurate for use by organization decision makers. Evidence-based decision making is emphasized when teaching planning and control activities. In addition, fluency in accounting is enhanced which leads to greater skill in patient and nursing advocacy. As competency in management accounting increases through the semester, executive MSN students are encouraged to apply cost accounting course content to their practice settings and to analyze how planning or control activities improve quality outcomes.
ERIC Educational Resources Information Center
Mack, Yvette E.
2010-01-01
This study evaluated and analyzed medical school executives' perceptions of the low level of advancement of women into the healthcare c-suite. As well, medical school executives' recommendations for increasing the number of women entering and experiencing sustained success in executive positions were assessed. Related to these observations were…
Towards the effective plastic waste management in Bangladesh: a review.
Mourshed, Monjur; Masud, Mahadi Hasan; Rashid, Fazlur; Joardder, Mohammad Uzzal Hossain
2017-12-01
The plastic-derived product, nowadays, becomes an indispensable commodity for different purposes. A huge amount of used plastic causes environmental hazards that turn in danger for marine life, reduces the fertility of soil, and contamination of ground water. Management of this enormous plastic waste is challenging in particular for developing countries like Bangladesh. Lack of facilities, infrastructure development, and insufficient budget for waste management are some of the prime causes of improper plastic management in Bangladesh. In this study, the route of plastic waste production and current plastic waste management system in Bangladesh have been reviewed extensively. It emerges that no technical and improved methods are adapted in the plastic management system. A set of the sustainable plastic management system has been proposed along with the challenges that would emerge during the implementation these strategies. Successful execution of the proposed systems would enhance the quality of plastic waste management in Bangladesh and offers enormous energy from waste.
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
KIRKBRIDE, R.A.
The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.
ERIC Educational Resources Information Center
Roth, Gene; Tesolowski, Dennis
This handbook is the third in a series of five competency-based resource guides on microcomputer applications for vocational teachers. The 13 units of instruction in this handbook are concerned with the content of the 14 competencies included in the category, "Planning, Executing, and Evaluating Competency-Based Instruction." Units are designed to…
ERIC Educational Resources Information Center
Carlson, Stephanie M.; Moses, Louis J.; Claxton, Laura J.
2004-01-01
This research examined the relative contributions of two aspects of executive function--inhibitory control and planning ability--to theory of mind in 49 3- and 4-year-olds. Children were given two standard theory of mind measures (Appearance-Reality and False Belief), three inhibitory control tasks (Bear/Dragon, Whisper, and Gift Delay), three…
Integrating planning, execution, and learning
NASA Technical Reports Server (NTRS)
Kuokka, Daniel R.
1989-01-01
To achieve the goal of building an autonomous agent, the usually disjoint capabilities of planning, execution, and learning must be used together. An architecture, called MAX, within which cognitive capabilities can be purposefully and intelligently integrated is described. The architecture supports the codification of capabilities as explicit knowledge that can be reasoned about. In addition, specific problem solving, learning, and integration knowledge is developed.
Executive dysfunction in bipolar disorder and borderline personality disorder.
Gvirts, H Z; Braw, Y; Harari, H; Lozin, M; Bloch, Y; Fefer, K; Levkovitz, Y
2015-11-01
The boundary between bipolar disorder (BD) and borderline personality disorder is a controversial one. Despite the importance of the topic, few studies have directly compared these patient groups. The aim of the study was to compare the executive functioning profile of BD and BPD patients. Executive functioning (sustained attention, problem-solving, planning, strategy formation, cognitive flexibility and working memory) was assessed in BD (n=30) and BPD outpatients (n=32) using a computerized assessment battery (Cambridge Neuropsychological Test Automated Battery, CANTAB). The groups were compared to one another as well as to healthy controls. BD patients showed deficits in strategy formation and in planning (indicated by longer execution time in the ToL task) in comparison to BPD patients and healthy controls. BPD patients showed deficits in planning (short deliberation time in the ToL task) in comparison to BD patients and in comparison to healthy controls. In comparison to healthy controls, BPD patients displayed deficits in problem-solving. Differences in executive dysfunction between BD and BPD patients suggest that this cognitive dimension may be relevant for the clarification of the boundary between the disorders. Copyright © 2015. Published by Elsevier Masson SAS.
Texas hospital chief executive officers evaluate content areas in health administration education.
Harkins, L T; Herkimer, A G
1995-01-01
Health care executives are confronted by a working environment that is increasingly difficult to manage. Skyrocketing health care costs, with shrinking reimbursement, threaten the existence of hospitals. A successful hospital chief executive officer (CEO) is one who can effectively manage his/her hospital in spite of industry challenges and problems. Graduate programs in health services administration must be designed to meet the needs of future health care executives. Many times, educators are criticized for not addressing "real world" issues within the curricular structure. The present study was conducted to gather information from executives who are the experts on what to expect in the health care industry regarding the appropriateness of curricular topics. Results indicate that practicing CEOs believe those curricular areas which focus on financial planning, budgeting, medical-legal issues, and strategic planning are more important than those that deal with international health care, epidemiology, or research methods. The information gathered in this study may be useful as a guide for educators, to evaluate and revise existing graduate programs in health care administration. Data presented here may also be used to assist in long-range planning for new health administration programs.
40 CFR 256.03 - State plan submission, adoption, and revision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... promulgation of these guidelines. (b) Prior to submission to EPA, the plan shall be adopted by the State... requirements of these guidelines; (2) Information has become available which demonstrates the inadequacy of the...
40 CFR 256.03 - State plan submission, adoption, and revision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... promulgation of these guidelines. (b) Prior to submission to EPA, the plan shall be adopted by the State... requirements of these guidelines; (2) Information has become available which demonstrates the inadequacy of the...
40 CFR 256.03 - State plan submission, adoption, and revision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... promulgation of these guidelines. (b) Prior to submission to EPA, the plan shall be adopted by the State... requirements of these guidelines; (2) Information has become available which demonstrates the inadequacy of the...
40 CFR 256.03 - State plan submission, adoption, and revision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... promulgation of these guidelines. (b) Prior to submission to EPA, the plan shall be adopted by the State... requirements of these guidelines; (2) Information has become available which demonstrates the inadequacy of the...
40 CFR 256.03 - State plan submission, adoption, and revision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose... promulgation of these guidelines. (b) Prior to submission to EPA, the plan shall be adopted by the State... requirements of these guidelines; (2) Information has become available which demonstrates the inadequacy of the...
40 CFR 60.2615 - What must I do if I plan to permanently close my CISWI unit and not restart it?
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... plan is due. Model Rule—Waste Management Plan ...
40 CFR 60.2615 - What must I do if I plan to permanently close my CISWI unit and not restart it?
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... plan is due. Model Rule—Waste Management Plan ...
10 CFR 72.180 - Physical protection plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Physical protection plan. 72.180 Section 72.180 Energy... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Physical Protection § 72.180 Physical protection plan. The licensee shall establish, maintain, and follow a detailed...
10 CFR 72.180 - Physical protection plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Physical protection plan. 72.180 Section 72.180 Energy... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Physical Protection § 72.180 Physical protection plan. The licensee shall establish, maintain, and follow a detailed...
10 CFR 72.180 - Physical protection plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Physical protection plan. 72.180 Section 72.180 Energy... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Physical Protection § 72.180 Physical protection plan. The licensee shall establish, maintain, and follow a detailed...
10 CFR 72.180 - Physical protection plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Physical protection plan. 72.180 Section 72.180 Energy... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Physical Protection § 72.180 Physical protection plan. The licensee shall establish, maintain, and follow a detailed...
10 CFR 72.180 - Physical protection plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Physical protection plan. 72.180 Section 72.180 Energy... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Physical Protection § 72.180 Physical protection plan. The licensee shall establish, maintain, and follow a detailed...
FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Templeton, K.J.
1996-05-23
For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year tomore » maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on ranges provided by the waste generators, this baseline volume could fluctuate between a minimum of about 59,720 cubic meters and a maximum of about 152,170 cubic meters. The range is primarily due to uncertainties associated with the Tank Waste Remediation System (TWRS) program, including uncertainties regarding retrieval of long-length equipment, scheduling, and tank retrieval technologies.« less
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Systematic training and development of supervisors, managers, and executives. 412.202 Section 412.202 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning...
40 CFR 60.2555 - What combustion units are exempt from my State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What combustion units are exempt from... Construction On or Before November 30, 1999 Applicability of State Plans § 60.2555 What combustion units are... combustion air) of pathological waste, low-level radioactive waste, and/or chemotherapeutic waste as defined...
40 CFR 60.2555 - What combustion units are exempt from my State plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What combustion units are exempt from... Construction On or Before November 30, 1999 Applicability of State Plans § 60.2555 What combustion units are... combustion air) of pathological waste, low-level radioactive waste, and/or chemotherapeutic waste as defined...
40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...
40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...
40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...
40 CFR 62.14570 - What must I do if I plan to permanently close my CISWI unit?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and Increments of Progress § 62... evaluation of the option to transport your waste offsite to a commercial or municipal waste treatment and/or...
40 CFR 62.5151 - Identification of sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.5151 Identification of sources. The plan applies to all Maryland existing municipal solid waste landfills for which...
40 CFR 62.1951 - Identification of sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Landfill Gas Emissions from Existing Municipal Solid Waste Landfills (section 111(d) Plan) § 62.1951 Identification of sources. The plan applies to all Delaware existing municipal solid waste landfills for which...
40 CFR 62.660 - Identification of plan-negative declaration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Arizona Emissions from Existing Other Solid Waste Incineration Units § 62.660 Identification of plan... 14, 2008, certifying that there are no existing other solid waste incineration units in its...
40 CFR 62.660 - Identification of plan-negative declaration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Arizona Emissions from Existing Other Solid Waste Incineration Units § 62.660 Identification of plan... 14, 2008, certifying that there are no existing other solid waste incineration units in its...
Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations
NASA Technical Reports Server (NTRS)
Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.
2006-01-01
With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.
Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder
2007-04-02
Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.
Planning and Execution: The Spirit of Opportunity for Robust Autonomous Systems
NASA Technical Reports Server (NTRS)
Muscettola, Nicola
2004-01-01
One of the most exciting endeavors pursued by human kind is the search for life in the Solar System and the Universe at large. NASA is leading this effort by designing, deploying and operating robotic systems that will reach planets, planet moons, asteroids and comets searching for water, organic building blocks and signs of past or present microbial life. None of these missions will be achievable without substantial advances in.the design, implementation and validation of autonomous control agents. These agents must be capable of robustly controlling a robotic explorer in a hostile environment with very limited or no communication with Earth. The talk focuses on work pursued at the NASA Ames Research center ranging from basic research on algorithm to deployed mission support systems. We will start by discussing how planning and scheduling technology derived from the Remote Agent experiment is being used daily in the operations of the Spirit and Opportunity rovers. Planning and scheduling is also used as the fundamental paradigm at the core of our research in real-time autonomous agents. In particular, we will describe our efforts in the Intelligent Distributed Execution Architecture (IDEA), a multi-agent real-time architecture that exploits artificial intelligence planning as the core reasoning engine of an autonomous agent. We will also describe how the issue of plan robustness at execution can be addressed by novel constraint propagation algorithms capable of giving the tightest exact bounds on resource consumption or all possible executions of a flexible plan.
Waste Analysis Plan and Waste Characterization Survey, Barksdale AFB, Louisiana
1991-03-01
review to assess if analysis is needed, any analyses that are to be provided by generators, and methods to be used to meet specific waste analysis ...sampling method , sampling frequency, parameters of analysis , SW 846 test methods , Department of Transportation (DOT) shipping name and hazard class...S.e.iceA w/Atchs 2. HQ SAC/DEV Ltr, 28 Sep 90 19 119 APPENDIX B Waste Analysis Plan Rationale 21 APPENDIX B 1. SAMPLING METHOD RATIONALE: Composite Liquid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
40 CFR 62.14431 - What must my waste management plan include?
Code of Federal Regulations, 2013 CFR
2013-07-01
.... In developing your waste management plan, you must consider the American Hospital Association (AHA... publication (AHA Catalog Number 057007) is available for purchase from AHA Services, Inc., Post Office Box...
40 CFR 62.14431 - What must my waste management plan include?
Code of Federal Regulations, 2014 CFR
2014-07-01
.... In developing your waste management plan, you must consider the American Hospital Association (AHA... publication (AHA Catalog Number 057007) is available for purchase from AHA Services, Inc., Post Office Box...
40 CFR 62.7140 - Identification of plan-negative declaration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Nevada Emissions from Existing Other Solid Waste Incineration Units § 62.7140 Identification of plan..., 2006, certifying that there are no existing other solid waste incineration units subject to 40 CFR part...
40 CFR 62.7140 - Identification of plan-negative declaration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Nevada Emissions from Existing Other Solid Waste Incineration Units § 62.7140 Identification of plan..., 2006, certifying that there are no existing other solid waste incineration units subject to 40 CFR part...
40 CFR 62.14505 - What are the principal components of this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) through (k) of this section. (a) Increments of progress toward compliance. (b) Waste management plan. (c...
Iraq liquid radioactive waste tanks maintenance and monitoring program plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad
2011-10-01
The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less
Artemis: Integrating Scientific Data on the Grid (Preprint)
2004-07-01
Theseus execution engine [Barish and Knoblock 03] to efficiently execute the generated datalog program. The Theseus execution engine has a wide...variety of operations to query databases, web sources, and web services. Theseus also contains a wide variety of relational operations, such as...selection, union, or projection. Furthermore, Theseus optimizes the execution of an integration plan by querying several data sources in parallel and
Effectiveness of Therapeutic Programs for Students with ADHD with Executive Function Deficits
ERIC Educational Resources Information Center
Chaimaha, Napalai; Sriphetcharawut, Sarinya; Lersilp, Suchitporn; Chinchai, Supaporn
2017-01-01
The purpose of this study was to investigate the effectiveness of therapeutic programs, an executive function training program and a collaborative program, for students with attention-deficit/hyperactivity disorder (ADHD) with executive function deficits (EFDs), especially regarding working memory, planning, and monitoring. The participants were…
24 CFR 1710.117 - Cost sheet, signature of Senior Executive Officer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Cost sheet, signature of Senior... REGISTRATION Reporting Requirements § 1710.117 Cost sheet, signature of Senior Executive Officer. (a) Cost... description of our subdivision and development plans. Signature of Senior Executive Officer (2) Cost sheet...
A Technical/Strategic Paradigm for Online Executive Education
ERIC Educational Resources Information Center
Smith, Marlene A.; Keaveney, Susan M.
2017-01-01
This article discusses the development and delivery of online courses for the executive education audience. The goal is to introduce a new framework, the technical/strategic paradigm, that will help educators to identify the pedagogical needs of disparate executive groups and adjust their online course development plans accordingly. We describe…
A modular telerobotic task execution system
NASA Technical Reports Server (NTRS)
Backes, Paul G.; Tso, Kam S.; Hayati, Samad; Lee, Thomas S.
1990-01-01
A telerobot task execution system is proposed to provide a general parametrizable task execution capability. The system includes communication with the calling system, e.g., a task planning system, and single- and dual-arm sensor-based task execution with monitoring and reflexing. A specific task is described by specifying the parameters to various available task execution modules including trajectory generation, compliance control, teleoperation, monitoring, and sensor fusion. Reflex action is achieved by finding the corresponding reflex action in a reflex table when an execution event has been detected with a monitor.
Environmental Management System Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Robert; Thorson, Patrick; Horst, Blair
2009-03-24
Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less
Automating Space Station operations planning
NASA Technical Reports Server (NTRS)
Ziemer, Kathleen A.
1989-01-01
The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.
Gidarakos, E; Havas, G; Ntzamilis, P
2006-01-01
A one-year survey was conducted in the greater region of Crete (located at the lower region of the Aegean Sea) for the purpose of identifying waste composition (including chemical and physical characterization), as well as any seasonal variation. The investigation was carried out repeatedly at seven landfills and one transfer station in Crete, in four phases. Each sampling phase corresponded to a season (autumn, winter, spring, summer). ASTM D5231-92(2003) standard method and RCRA Waste Sampling Draft Technical Guidance were used. Hand sorting was used for classifying the collected wastes into the following categories: plastics, paper, metals, aluminium, leather-wood-textiles-rubbers, organic wastes, non-combustibles and miscellaneous. Further analysis included proximate and ultimate analysis of combustible materials. Metals such as lead, cadmium and mercury were also investigated. The results show that there has been a significant decrease of organic wastes during the last decade due to the increase of packaging materials, as a result of a change in consumption patterns. Three main waste categories were determined: organic wastes, paper and plastics, which combined represent 76% of the total waste in Crete. Furthermore, a high fraction of glass and a seasonal variation of aluminium indicate a strong correlation of waste composition with certain human activities, such as tourism. There is also a variation between the municipal solid waste (MSW) composition in the region of Crete (2003-2004) and MSW composition suggested in the National Solid Waste Planning (2000) [National Solid Waste Planning, 2000. Completion and particularization of Common Ministerial Act 113944//1944/1997: National Solid Waste Planning, June 2000]. The results of this survey are to be utilized by the regional solid waste authorities in order to establish an integrated waste treatment site, capable of fulfilling the regional waste management demands.
Software Testbed for Developing and Evaluating Integrated Autonomous Subsystems
NASA Technical Reports Server (NTRS)
Ong, James; Remolina, Emilio; Prompt, Axel; Robinson, Peter; Sweet, Adam; Nishikawa, David
2015-01-01
To implement fault tolerant autonomy in future space systems, it will be necessary to integrate planning, adaptive control, and state estimation subsystems. However, integrating these subsystems is difficult, time-consuming, and error-prone. This paper describes Intelliface/ADAPT, a software testbed that helps researchers develop and test alternative strategies for integrating planning, execution, and diagnosis subsystems more quickly and easily. The testbed's architecture, graphical data displays, and implementations of the integrated subsystems support easy plug and play of alternate components to support research and development in fault-tolerant control of autonomous vehicles and operations support systems. Intelliface/ADAPT controls NASA's Advanced Diagnostics and Prognostics Testbed (ADAPT), which comprises batteries, electrical loads (fans, pumps, and lights), relays, circuit breakers, invertors, and sensors. During plan execution, an experimentor can inject faults into the ADAPT testbed by tripping circuit breakers, changing fan speed settings, and closing valves to restrict fluid flow. The diagnostic subsystem, based on NASA's Hybrid Diagnosis Engine (HyDE), detects and isolates these faults to determine the new state of the plant, ADAPT. Intelliface/ADAPT then updates its model of the ADAPT system's resources and determines whether the current plan can be executed using the reduced resources. If not, the planning subsystem generates a new plan that reschedules tasks, reconfigures ADAPT, and reassigns the use of ADAPT resources as needed to work around the fault. The resource model, planning domain model, and planning goals are expressed using NASA's Action Notation Modeling Language (ANML). Parts of the ANML model are generated automatically, and other parts are constructed by hand using the Planning Model Integrated Development Environment, a visual Eclipse-based IDE that accelerates ANML model development. Because native ANML planners are currently under development and not yet sufficiently capable, the ANML model is translated into the New Domain Definition Language (NDDL) and sent to NASA's EUROPA planning system for plan generation. The adaptive controller executes the new plan, using augmented, hierarchical finite state machines to select and sequence actions based on the state of the ADAPT system. Real-time sensor data, commands, and plans are displayed in information-dense arrays of timelines and graphs that zoom and scroll in unison. A dynamic schematic display uses color to show the real-time fault state and utilization of the system components and resources. An execution manager coordinates the activities of the other subsystems. The subsystems are integrated using the Internet Communications Engine (ICE). an object-oriented toolkit for building distributed applications.
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any...
40 CFR 60.2065 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.2065 Section 60.2065 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., plastics, glass, batteries, or metals; or the use of recyclable materials. The plan must identify any...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What should I include in my waste management plan? 60.2901 Section 60.2901 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan...
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
40 CFR 60.2901 - What should I include in my waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the use of recyclable materials. The plan... place, the costs of additional measures, the emissions reductions expected to be achieved, and any other...
30 CFR 780.14 - Operation plan: Maps and plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., and non-coal waste storage area; (6) Each water diversion, collection, conveyance, treatment, storage... water impoundment, refuse pile, and coal mine waste impoundment for which plans are required by § 780.25... architecture. [44 FR 15357, Mar. 13, 1979; 44 FR 49685, Aug. 24, 1979, as amended at 45 FR 51550, Aug. 4, 1980...
ERIC Educational Resources Information Center
California State Postsecondary Education Commission, Sacramento.
This is an executive summary of two long-range higher education planning reports completed at the outset of the 21st century by the California Postsecondary Education Commission. They are "Providing for Progress: California Higher Education Enrollment Demand and Resources into the 21st Century" and the companion "Policy for…
Chemical, Biological, and Radiological Contamination Survivability: Material Effects Testing
2012-06-22
form that can be compared to pretest and posttest functional performance data. If Soldiers are desired, ensure a Test Schedule and Review Committee...test execution. f. The material’s performance specification should also be reviewed before planning test execution. For example , the...test data, and conformance with specified test and operating procedures cannot be overemphasized. 3.1 Test Planning. 3.1.1 Pretest Preparation
300 Area waste acid treatment system closure plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.
40 CFR 62.3917 - Identification of plan-negative declaration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Air Emissions from Existing âotherâ Solid Waste Incineration Units § 62.3917 Identification of plan..., certifying that there are no commercial and industrial solid waste incineration units subject to 40 CFR part...
40 CFR 62.3917 - Identification of plan-negative declaration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Air Emissions from Existing âotherâ Solid Waste Incineration Units § 62.3917 Identification of plan..., certifying that there are no commercial and industrial solid waste incineration units subject to 40 CFR part...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.
Attorney General Opinions Executive Branch Ethics Criminal Justice Alaska Medicaid Fraud Control Anchorage Abuse Executive Branch Ethics Law Resources Public Safety Action Plan Federal Issues and Conflicts - PDF