40 CFR 71.5 - Permit applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...
The Army Corps of Engineers’ Nationwide Permits Program: Issues and Regulatory Developments
2008-08-21
and wetland delineators of areas that are, in fact, wetlands (criteria concerning characteristic hydrology, soil , and vegetation), and are increasingly...Existing Commercial Shellfish Aquaculture Activities. This permit authorizes structures or works in navigable waters, as well as discharges into all waters...of the United States for the continued operation of existing commercial oyster, clam, geoduck, mussel or scallop aquaculture operations. It does not
30 CFR 761.12 - Exception for existing operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... program, exists when the land comes under the protection of § 761.11. This exception applies only to lands within the permit area as it exists when the land comes under the protection of § 761.11. (b) With... coal mining operations exist when the land comes under the protection of 30 U.S.C. 1272(e) or § 761.11...
30 CFR 761.12 - Exception for existing operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... program, exists when the land comes under the protection of § 761.11. This exception applies only to lands within the permit area as it exists when the land comes under the protection of § 761.11. (b) With... coal mining operations exist when the land comes under the protection of 30 U.S.C. 1272(e) or § 761.11...
30 CFR 761.12 - Exception for existing operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... program, exists when the land comes under the protection of § 761.11. This exception applies only to lands within the permit area as it exists when the land comes under the protection of § 761.11. (b) With... coal mining operations exist when the land comes under the protection of 30 U.S.C. 1272(e) or § 761.11...
30 CFR 761.12 - Exception for existing operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... program, exists when the land comes under the protection of § 761.11. This exception applies only to lands within the permit area as it exists when the land comes under the protection of § 761.11. (b) With... coal mining operations exist when the land comes under the protection of 30 U.S.C. 1272(e) or § 761.11...
30 CFR 761.12 - Exception for existing operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... program, exists when the land comes under the protection of § 761.11. This exception applies only to lands within the permit area as it exists when the land comes under the protection of § 761.11. (b) With... coal mining operations exist when the land comes under the protection of 30 U.S.C. 1272(e) or § 761.11...
Federal Enforceability of State's Existing Minor New Source Review (NSR) Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Lincolnway Energy Cooperative and Co-location with Existing Grain Cooperative
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... ago. (For example, 10 CSR 10-5.250 required existing sources to comply with emissions limitation no... identified in the approved SIP as 10 CSR 10- 2.150, 4.140, and 5.250, applicable to the Kansas City... to the Operating Permits Program (10 CSR 10-6.110). One revision changes the reporting threshold for...
47 CFR 73.1615 - Operation during modification of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...
40 CFR 70.5 - Permit applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...
Water Treatment Plant Operation. Volume II. A Field Study Training Program.
ERIC Educational Resources Information Center
California State Univ., Sacramento. School of Engineering.
The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…
Water Treatment Plant Operation. Volume I. A Field Study Training Program.
ERIC Educational Resources Information Center
California State Univ., Sacramento. School of Engineering.
The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…
ERIC Educational Resources Information Center
California State Univ., Sacramento. Dept. of Civil Engineering.
The purpose of this wastewater treatment field study training program is to: (1) develop new qualified wastewater treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…
Water Treatment Plant Operation Volume 2. A Field Study Training Program. Revised.
ERIC Educational Resources Information Center
California State Univ., Sacramento. School of Engineering.
The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…
40 CFR 267.142 - Cost estimate for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...
40 CFR 267.142 - Cost estimate for closure.
Code of Federal Regulations, 2011 CFR
2011-07-01
... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...
Code of Federal Regulations, 2011 CFR
2011-10-01
... demonstrate that: (a) The level of visitation for recreational purposes is high enough to justify the... existence for implementing and operating a system of collecting fees for admission permits; and (c...
Code of Federal Regulations, 2010 CFR
2010-10-01
... demonstrate that: (a) The level of visitation for recreational purposes is high enough to justify the... existence for implementing and operating a system of collecting fees for admission permits; and (c...
Evolving policies to regulate pollution from animal feeding operations.
Centner, T J
2001-11-01
Due to concentrations of animals at large facilities, animal feeding operations (AFOs) have emerged as a major potential source of water pollution. The federal government regulates concentrated animal feeding operations under its point-source pollution permitting regulations. A major determinant of whether an operation must apply for a permit is the number of animals at an individual lot or facility. This paper examines federal mandatory controls and voluntary guidelines that seek to reduce contaminant pollution from AFOs. Land treatment practices are delineated due to their importance in reducing the injurious by-products of agricultural production. An evaluation of proposed revisions to federal regulations on confined animal feeding operations suggests they diverge from their goal of controlling water pollution. Federal regulations focus on the size of operation and amount of manure governed by the permitting process to the exclusion of other criteria related to the impairment of water quality. Given the uncertainties about the amount of pollution from AFOs, lack of enforcement of existing regulations, localization of problems, and possible alternatives for addressing the pollution, more demanding federal regulations may not form an appropriate response.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... consist of up to 32 wind turbines with a generating capacity of 82 megawatts (MW) of electricity. Power generated by the wind turbines would be transmitted to the existing Bonneville Power Administration... conjunction with the construction, operation, maintenance, and decommissioning of the Radar Ridge Wind Project...
27 CFR 71.5 - Meaning of terms.
Code of Federal Regulations, 2011 CFR
2011-04-01
... words importing the masculine gender shall include the feminine. The terms “include” and “including” do... (26 U.S.C.) for operations not covered by an existing permit. Appropriate TTB officer. An officer or...
27 CFR 71.5 - Meaning of terms.
Code of Federal Regulations, 2014 CFR
2014-04-01
... words importing the masculine gender shall include the feminine. The terms “include” and “including” do... (26 U.S.C.) for operations not covered by an existing permit. Appropriate TTB officer. An officer or...
27 CFR 71.5 - Meaning of terms.
Code of Federal Regulations, 2012 CFR
2012-04-01
... words importing the masculine gender shall include the feminine. The terms “include” and “including” do... (26 U.S.C.) for operations not covered by an existing permit. Appropriate TTB officer. An officer or...
27 CFR 71.5 - Meaning of terms.
Code of Federal Regulations, 2010 CFR
2010-04-01
... words importing the masculine gender shall include the feminine. The terms “include” and “including” do... (26 U.S.C.) for operations not covered by an existing permit. Appropriate TTB officer. An officer or...
27 CFR 71.5 - Meaning of terms.
Code of Federal Regulations, 2013 CFR
2013-04-01
... words importing the masculine gender shall include the feminine. The terms “include” and “including” do... (26 U.S.C.) for operations not covered by an existing permit. Appropriate TTB officer. An officer or...
40 CFR 147.2918 - Permit application information.
Code of Federal Regulations, 2010 CFR
2010-07-01
... location, depth, date drilled, and record of plugging and/or completion. (3) Operating data: (i) Maximum... logging and testing data on the well (for existing wells, i.e., wells to be converted or wells previously...
Brentwood Lessons Learned Project Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.
The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Mike
This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistentmore » with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.« less
40 CFR 147.2920 - Operating requirements for wells authorized by permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (c) Injection pressure at the wellhead shall be limited so that it does not initiate new fractures or propagate existing fractures in the confining zone adjacent to any UDSW. (d) Injection wells or projects...
40 CFR 147.2920 - Operating requirements for wells authorized by permit.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (c) Injection pressure at the wellhead shall be limited so that it does not initiate new fractures or propagate existing fractures in the confining zone adjacent to any UDSW. (d) Injection wells or projects...
40 CFR 147.2920 - Operating requirements for wells authorized by permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (c) Injection pressure at the wellhead shall be limited so that it does not initiate new fractures or propagate existing fractures in the confining zone adjacent to any UDSW. (d) Injection wells or projects...
40 CFR 147.2920 - Operating requirements for wells authorized by permit.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (c) Injection pressure at the wellhead shall be limited so that it does not initiate new fractures or propagate existing fractures in the confining zone adjacent to any UDSW. (d) Injection wells or projects...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, Stan; Hightower, Jared; Knight, Koby
This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.
2005-12-01
1-2 lntemattonal Airport Buckley AFB, Colorado Prepared By 460th CEV Last Revised 21 July 2005 SECTION 1.0 PURPOSE OF AND NEED FOR THE ACTION...88°F in July and low is l5°F in January. Monthly precipitation fluctuates throughout the year 15 with the wettest months being May through June. The...Operating Permit No. 950PAR118. This permit was originally issued on 28 August 1997, was 19 most recently reissued 0 I July 2002, and will expire 30
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
Digital photogrammetry at the U.S. Geological Survey
Greve, Clifford W.
1995-01-01
The U.S. Geological Survey is converting its primary map production and revision operations to use digital photogrammetric techniques. The primary source of data for these operations is the digital orthophoto quadrangle derived from National Aerial Photography Program images. These digital orthophotos are used on workstations that permit comparison of existing vector and raster data with the orthophoto and interactive collection and revision of the vector data.
18 CFR 153.16 - Contents of application.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...
18 CFR 153.16 - Contents of application.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...
76 FR 9376 - Proposed Extension of Existing Information Collection;
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-17
... helps to assure that requested data can be provided in the desired format, reporting burden (time and...) that are removed during mining operations or separated from mined coal and deposited on the surface... collection techniques or other forms of information technology, e.g., permitting electronic submissions of...
Automatic identification of cochlear implant electrode arrays for post-operative assessment
NASA Astrophysics Data System (ADS)
Noble, Jack H.; Schuman, Theodore A.; Wright, Charles G.; Labadie, Robert F.; Dawant, Benoit M.
2011-03-01
Cochlear implantation is a procedure performed to treat profound hearing loss. Accurately determining the postoperative position of the implant in vivo would permit studying the correlations between implant position and hearing restoration. To solve this problem, we present an approach based on parametric Gradient Vector Flow snakes to segment the electrode array in post-operative CT. By combining this with existing methods for localizing intra-cochlear anatomy, we have developed a system that permits accurate assessment of the implant position in vivo. The system is validated using a set of seven temporal bone specimens. The algorithms were run on pre- and post-operative CTs of the specimens, and the results were compared to histological images. It was found that the position of the arrays observed in the histological images is in excellent agreement with the position of their automatically generated 3D reconstructions in the CT scans.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... ENVIRONMENTAL PROTECTION AGENCY [Regional Docket Nos. V-2009-1, FRL-9276-7] Clean Air Act Operating Permit Program; Objection to State Operating Permit for U.S. Steel-Granite City Works AGENCY... operating permit issued by the Illinois Environmental Protection Agency to the U.S. Steel--Granite City...
Language Analysis Package (L.A.P.) Version I System Design.
ERIC Educational Resources Information Center
Porch, Ann
To permit researchers to use the speed and versatility of the computer to process natural language text as well as numerical data without undergoing special training in programing or computer operations, a language analysis package has been developed partially based on several existing programs. An overview of the design is provided and system…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... language to existing stormwater regulations to clarify that, for the purposes of assessing whether... operations, surface drainage, or road construction and maintenance from which there is natural runoff.'' In... if a discharge was ``directly related to manufacturing, processing or raw materials storage areas at...
75 FR 73065 - Tennessee Gas Pipeline Company; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
.... CP11-22-000, an application pursuant to section 3 of the Natural Gas Act (NGA), to amend its authorization under NGA section 3 and Presidential Permits to allow it to import and export natural gas from the... NGA be amended to authorize Tennessee to operate bi- directionally two existing international border...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of... TV broadcast and Digital TV (DTV) operations. The Commission permits broadcasters to agree to... broadcast facilities will not result in additional interference to existing TV and DTV broadcast facilities...
The Cost-Quality Debate in School Finance Legislation: Do Dollars Make a Difference?
ERIC Educational Resources Information Center
McDermott, John E.; Klein, Stephen P.
1974-01-01
The appropriateness of using the judicial process as a forum for resolving the cost-quality debate in educational finance is discussed in an attempt to discover some intermediate ground, which would permit the judicial machinery to operate but avoids settling the scientific dispute. Existing judicial standards of educational opportunity are…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... operating permit (Permit Number P062R2) issued by the New Mexico Environment Department, Air Quality Bureau... Objection to State Operating Permit for Public Service Company of New Mexico, San Juan Generating Station... Mexico, for the operations of the San Juan Generating Station (SJGS) located in San Juan County, New...
NASA Astrophysics Data System (ADS)
Martin, K. L.; Emanuel, R. E.; Vose, J. M.
2016-12-01
The number of concentrated animal feeding operations (CAFOs) has increased rapidly in recent decades. Although important to food supplies, CAFOs may present significant risks to human health and environmental quality. The National land cover database (NLCD) is a publically available database of land cover whose purpose is to provide assessment of ecosystem health, facilitate nutrient modeling, land use planning, and developing land management practices. However, CAFOs do not align with any existing NLCD land cover classes. This is especially concerning due to their distinct nutrient loading characteristics, potential for other environmental impacts, and given that individual CAFOs may occupy several NLCD pixels worth of ground area. Using 2011 NLCD data, we examined the land cover classification of CAFO sites in North Carolina (USA). Federal regulations require CAFOs with a liquid waste disposal system to obtain a water quality permit. In North Carolina, there were 2679 permitted sites as of 2015, primarily in the southeastern part of the state. As poultry operations most frequently use dry waste disposal systems, they are not required to obtain a permit and thus, their locations are undocumented. For each permitted CAFO, we determined the mode of the NLCD land uses within a 50m buffer surrounding point coordinates. We found permitted CAFOS were most likely to be classified as hay/pasture (58%). An additional 13% were identified as row crops, leaving 29% as a non-agricultural land cover class, including wetlands (12%). This misclassification of CAFOs can have implications for environmental management and public policy. Scientists and land managers need access to better spatial data on the distribution of these operations to monitor the environmental impacts and identify the best landscape scale mitigation strategies. We recommend adding a new land cover class (concentrated animal operations) to the NLCD database.
40 CFR 72.72 - Criteria for State operating permit program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...
40 CFR 72.72 - Criteria for State operating permit program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...
40 CFR 72.72 - Criteria for State operating permit program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...
40 CFR 72.72 - Criteria for State operating permit program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...
40 CFR 72.72 - Criteria for State operating permit program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...
47 CFR 13.7 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... are twelve types of commercial radio operator licenses, certificates and permits (licenses). The... Radiotelephone Operator License (radiotelephone operator's general certificate). (6) Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (7) Restricted Radiotelephone Operator Permit (radiotelephone...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... includes a rescission of one definition from the existing SIP (the definition of ``special mobile equipment... operating permit'' 08/19/04 01/24/11 defined. NAC 445B.179 ``Special mobile equipment'' defined..... 10/05... article 1.182--Special mobile equipment 43 FR 36932 (August 21, 1978). NAQR article 1.187--Stationary...
40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... DISCHARGE ELIMINATION SYSTEM Requirements Applicable to Cooling Water Intake Structures for Phase II... the requirements of this subpart? (a) Permit application. As the Director, you must review materials... application from the owner or operator of a Phase II existing facility, you must determine which of the...
40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... DISCHARGE ELIMINATION SYSTEM Requirements Applicable to Cooling Water Intake Structures for Phase II... the requirements of this subpart? (a) Permit application. As the Director, you must review materials... application from the owner or operator of a Phase II existing facility, you must determine which of the...
40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... DISCHARGE ELIMINATION SYSTEM Requirements Applicable to Cooling Water Intake Structures for Phase II... the requirements of this subpart? (a) Permit application. As the Director, you must review materials... application from the owner or operator of a Phase II existing facility, you must determine which of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... feasibility of the Wailua Reservoir Water Power (Wailua Reservoir project) to be located on the Wailua.... The proposed project will utilize flows from the existing 1,400- foot-long earth-fill dam on the Wailua Reservoir, which is owned and operated by State of Hawaii's Department of Land and Natural...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... Objection to Federal Operating Permit for American Electric Power Service Corporation, Southwest Electric... object to the American Electric Power Service Corporation, Southwest Electric Power Company (AEP... Permits Section, Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... Elimination System (NPDES) General Permit for Discharges From Concentrated Animal Feeding Operations (CAFOs... permit for discharges from eligible owners/operators of concentrated animal feeding operations (CAFOs... of the final permit, animal feeding operations that are defined as CAFOs or designated as CAFOs by...
List of draft permit & supporting documentation for the Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay (Modification to Existing Permit LNG Regasification Vessel/DWP Project).
47 CFR 80.151 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...
47 CFR 80.151 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...
47 CFR 80.151 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of.... Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (2) RL. Restricted Radiotelephone Operator Permit-Limited Use. (3) MP. Marine Radio Operator Permit (radiotelephone...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Restricted Radiotelephone Operator Permit or a Restricted Radiotelephone Operator Permit-Limited Use must be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... ENVIRONMENTAL PROTECTION AGENCY [Petition IV-2011-1; FRL-9734-2] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority's Shawnee Fossil... Valley Authority for its Shawnee Fossil Plant (SFP) facility located in West Paducah, Kentucky. This...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9167-5] Clean Air Act Operating Permit Program; Petition for Objection to a Federal Operating Permit for Waste Management of Louisiana L.L.C., Woodside Landfill and Recycling Center (WLRC), Walker, Livingston Parish, LA AGENCY: Environmental Protection Agency (EPA). ACTION...
Reducing concentrated animal feeding operations permitting requirements.
Centner, T J; Newton, G L
2011-12-01
Many owners and operators of concentrated animal feeding operations (CAFO) need to secure National Pollutant Discharge Elimination System permits from the federal or state permitting authority. Because of the expense and inconvenience of permit applications, farm groups have challenged revisions to the federal CAFO Rule as well as state regulations claiming selected provisions exceeded the authority of the permitting agency. In 2011, 2 courts responded with decisions that clarify federal and state permitting regulations. Another goal of agricultural groups is to change the regulatory authority of the state from an environmental agency to a department of agriculture. These developments suggest that by altering the permitting authority, CAFO owners and operators may alleviate some of the burdens of the permitting process.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... General OMB Office of Management and Budget PHS Act Public Health Service Act QHP Qualified Health Plan...) performs some of the issuer's management functions under contract or delegation. Thus, CMS would permit a... billing, and case management from a health insurance issuer that existed on July 16, 2009, as long as the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... the feasibility of the Paint Creek Dam Project No. 13633, to be located at the existing Paint Creek Dam on Paint Creek, in Highland County, Ohio. The Paint Creek Dam is owned and operated by the U.S.... Applicant Contact: Randall Smith, 4950 Frazeysburg Road, Zanesville, OH 43701, (740) 891-5424. [[Page 13528...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... South Haiwee reservoir, near the town of Olancha, Inyo County, California. The project would affect... (Alternatives A and B) would consist of the existing South Haiwee dam. The dam has operations limited due to... the water level in the reservoir is limited to a maximum elevation of 3,742 feet msl. The applicant is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Name, No
This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in themore » initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
... Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY... McGillivray Westerberg and Bender, LLC, on behalf of the Sierra Club, to object to the operating permit for Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Can my operations plan, drilling permit... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well? (a) Your...
40 CFR 72.70 - Relationship to title V operating permit program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...
40 CFR 72.70 - Relationship to title V operating permit program.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...
40 CFR 72.70 - Relationship to title V operating permit program.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...
40 CFR 72.70 - Relationship to title V operating permit program.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...
40 CFR 72.70 - Relationship to title V operating permit program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
25 CFR 173.4 - Permits subject to existing and future rights-of-way.
Code of Federal Regulations, 2013 CFR
2013-04-01
... § 173.4 Permits subject to existing and future rights-of-way. Use by the permittee of any land authorized under this part shall be subject to the right of the Secretary to establish trails, roads and... 25 Indians 1 2013-04-01 2013-04-01 false Permits subject to existing and future rights-of-way. 173...
25 CFR 173.4 - Permits subject to existing and future rights-of-way.
Code of Federal Regulations, 2011 CFR
2011-04-01
... § 173.4 Permits subject to existing and future rights-of-way. Use by the permittee of any land authorized under this part shall be subject to the right of the Secretary to establish trails, roads and... 25 Indians 1 2011-04-01 2011-04-01 false Permits subject to existing and future rights-of-way. 173...
25 CFR 173.4 - Permits subject to existing and future rights-of-way.
Code of Federal Regulations, 2010 CFR
2010-04-01
... § 173.4 Permits subject to existing and future rights-of-way. Use by the permittee of any land authorized under this part shall be subject to the right of the Secretary to establish trails, roads and... 25 Indians 1 2010-04-01 2010-04-01 false Permits subject to existing and future rights-of-way. 173...
25 CFR 173.4 - Permits subject to existing and future rights-of-way.
Code of Federal Regulations, 2012 CFR
2012-04-01
... § 173.4 Permits subject to existing and future rights-of-way. Use by the permittee of any land authorized under this part shall be subject to the right of the Secretary to establish trails, roads and... 25 Indians 1 2012-04-01 2011-04-01 true Permits subject to existing and future rights-of-way. 173...
25 CFR 173.4 - Permits subject to existing and future rights-of-way.
Code of Federal Regulations, 2014 CFR
2014-04-01
... § 173.4 Permits subject to existing and future rights-of-way. Use by the permittee of any land authorized under this part shall be subject to the right of the Secretary to establish trails, roads and... 25 Indians 1 2014-04-01 2014-04-01 false Permits subject to existing and future rights-of-way. 173...
Kepler: NASA's First Mission Capable of Finding Earth-Size Planets
NASA Technical Reports Server (NTRS)
Borucki, William J.
2009-01-01
Kepler, a NASA Discovery mission, is a spaceborne telescope designed to search a nearby region of our galaxy for Earth-size planets orbiting in the habitable zone of stars like our sun. The habitable zone is that region around a start where the temperature permits water to be liquid on the surface of a planet. Liquid water is considered essential forth existence of life. Mission Phases: Six mission phases have been defined to describe the different periods of activity during Kepler's mission. These are: launch; commissioning; early science operations, science operations: and decommissioning
NASA Technical Reports Server (NTRS)
Obrien, Charles J.
1993-01-01
Existing NASA research contracts are supporting development of advanced reinforced polymer and metal matrix composites for use in liquid rocket engines of the future. Advanced rocket propulsion concepts, such as modular platelet engines, dual-fuel dual-expander engines, and variable mixture ratio engines, require advanced materials and structures to reduce overall vehicle weight as well as address specific propulsion system problems related to elevated operating temperatures, new engine components, and unique operating processes. High performance propulsion systems with improved manufacturability and maintainability are needed for single stage to orbit vehicles and other high performance mission applications. One way to satisfy these needs is to develop a small engine which can be clustered in modules to provide required levels of total thrust. This approach should reduce development schedule and cost requirements by lowering hardware lead times and permitting the use of existing test facilities. Modular engines should also reduce operational costs associated with maintenance and parts inventories.
Code of Federal Regulations, 2010 CFR
2010-07-01
... measuring paint booth filter efficiency and spray gun transfer efficiency in § 63.11173(e)(2) and (3) are... the obligation to obtain Title V operating permits. § 63.1(c)(5) Notifications Yes § 63.1(e...) Compliance Dates for Existing Sources Yes § 63.11172 specifies the compliance dates. § 63.6(e)(1)-(2...
Profitability: comparing hospital results with other industries.
Cleverley, W O; Harvey, R K
1990-03-01
Changes in healthcare economics now permit more meaningful financial comparisons between hospitals and other industries. A study focusing on return on equity and other financial ratios highlighted critical changes needed to improve the fiscal health of hospitals. These suggestions include increasing net prices on existing product lines, entering new markets, using short-term debt to relieve long-term debt burdens, and expanding uses of operating leases.
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.
Commutative Algebras of Toeplitz Operators in Action
NASA Astrophysics Data System (ADS)
Vasilevski, Nikolai
2011-09-01
We will discuss a quite unexpected phenomenon in the theory of Toeplitz operators on the Bergman space: the existence of a reach family of commutative C*-algebras generated by Toeplitz operators with non-trivial symbols. As it tuns out the smoothness properties of symbols do not play any role in the commutativity, the symbols can be merely measurable. Everything is governed here by the geometry of the underlying manifold, the hyperbolic geometry of the unit disk. We mention as well that the complete characterization of these commutative C*-algebras of Toeplitz operators requires the Berezin quantization procedure. These commutative algebras come with a powerful research tool, the spectral type representation for the operators under study, which permit us to answer to many important questions in the area.
40 CFR 52.743 - Continuous monitoring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the right to deem an operating permit not federally enforceable. Such a determination will be made... 28, 1989) and will be based upon either; the permit, permit approval procedures or state or local permit requirements which do not conform with the operating permit program requirements or the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... Act (Act) by WildEarth Guardians (Petitioner), to object to WDEQ's June 7, 2011 Permit (Permit) issued...Earth Petitioner dated August 4, 2011, requesting that EPA object to the issuance of the Permit to CLF&P...
40 CFR 49.9869 - Permits to operate.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9869 Permits to operate. Permits to operate...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... Approval of Revision of Five California Clean Air Act Title V Operating Permits Programs AGENCY... the Operating Permits (Title V) programs of the Monterey Bay Unified Air Pollution Control District... been previously subject to Title V for other reasons to obtain a Title V permit. See ``Prevention of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...
Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site
Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.
Title V Operating Permit: XTO Energy, Inc. - Tap 5 Compressor Station
Initial Title V Operating Permit (Permit Number: V-UO-000018-2007.00) and the Administrative Permit Record for the XTO Energy, Inc., Tap 5 Compressor Station, located on the Uintah and Ouray Indian Reservation.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... and Lime AGENCY: Environmental Protection Agency (EPA). ACTION: Denial of petition. SUMMARY: This... object to a Title V operating permit for Carmeuse Stone and Lime (Carmeuse) issued by the Wisconsin...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-15
... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...
The doctrinal basis for medical stability operations.
Baker, Jay B
2010-01-01
This article describes possible roles for the military in the health sector during stability operations, which exist primarily when security conditions do not permit the free movement of civilian actors. This article reviews the new U.S. Army Field Manuals (FMs) 3-24, Counterinsurgency and FM 3-07, Stability Operations, in the context of the health sector. Essential tasks in medical stability operations are identified for various logical lines of operation including information operations, civil security, civil control, support to governance, support to economic development, and restoration of essential services. Restoring essential services is addressed in detail including coordination, assessment, actions, and metrics in the health sector. Coordination by the military with other actors in the health sector including host nation medical officials, other United States governmental agencies, international governmental organizations (IGOs), and nongovernment organizations (NGOs) is key to success in medical stability operations.
30 CFR 784.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.10... requires applicants for permits for underground coal mines to prepare and submit an operation and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.1 Scope. This part provides the... operations and reclamation plan portions of applications for permits for surface mining activities, except to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.
Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station
Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.
40 CFR 52.1233 - Operating permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. Emission limitations and related provisions which are established in Minnesota permits as federally...
Paramount Refinery, Paramount, California; Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Petition to Object to Yarnell Mining Company's Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Petition to Object to Edwardsport Generating Station Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
40 CFR 52.1233 - Operating permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...
40 CFR 52.1233 - Operating permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...
40 CFR 52.1233 - Operating permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...
40 CFR 52.1233 - Operating permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1233 Operating permits. (a) Emission limitations and related provisions which are established in Minnesota permits as federally...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
Title V Operating Permit: CR Group, LLC - Tekoi Landfill
Final First Renewal of the Operating Permit (Permit Number: V-SV-000001-2016.00), Response to Public Comments and the Administrative Permit Record for the CR Group, LLC, Tekoi Landfill, located on the Skull Valley Indian Reservation, in Tooele County, UT.
Title V Operating Permit: XTO Energy, Inc. - Little Canyon Unit Compressor Station
Initial Title V Operating Permit (Permit Number: V-UO-000016-2006.00), Response to Public Comments and the Administrative Permit Record for the XTO Energy, Inc., Little Canyon Unit Compressor Station, located on the Uintah and Ouray Indian Reservation.
The Arctic Lower Troposphere Observed Structure (ALTOS) Campaign
DOE Office of Scientific and Technical Information (OSTI.GOV)
Verlinde, J
2010-10-18
The ALTOS campaign focuses on operating a tethered observing system for routine in situ sampling of low-level (< 2 km) Arctic clouds. It has been a long-term hope to fly tethered systems at Barrow, Alaska, but it is clear that the Federal Aviation Administration (FAA) will not permit in-cloud tether systems at Barrow, even if unmanned aerial vehicle (UAV) operations are allowed in the future. We have provided the scientific rationale for long-term, routine in situ measurements of cloud and aerosol properties in the Arctic. The existing restricted air space at Oliktok offers an opportunity to do so.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... Full Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The EPA is promulgating full approval of the Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating...
East Kentucky Power Cooperative Spurlock Station; Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Premcor Refining Group, Port Arthur, Texas; Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Tradewinds Veneer Mill, Ookala, Hawaii; Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Tradewinds Veneer Mill, Ookala, Hawaii; Petiton to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Tennessee Valley Authority, Paradise Fossil Plant; Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Thoroughbred Generating Company; Supplement to Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Cemex, Inc., Lyons, Colorado; Petition to Object (or reopen) to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Petition to Object to New United Motor Manufacturing, Inc. Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...
47 CFR 13.9 - Eligibility and application for new license or endorsement.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar Endorsement, Six Months Service Endorsement, GMDSS Radio Operator's License, Restricted GMDSS Radio Operator's... Radiotelephone Operator License, Marine Radio Operator Permit, Radiotelegraph Operator License, Ship Radar...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
40 CFR 52.1834 - Minor source permit to operate program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...
40 CFR 52.1834 - Minor source permit to operate program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...
40 CFR 52.1834 - Minor source permit to operate program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Minor source permit to operate program. 52.1834 Section 52.1834 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Minor source permit to operate program. Emission limitations and related provisions, which, in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-20
... the Sierra Club asking EPA to object to a Title V operating permit for the Wisconsin Public Service... this period. On June 25, 2009, EPA received a petition from the Sierra Club requesting that EPA object...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-28
... (EPA). ACTION: Notice. SUMMARY: This notice announces that, on December 30, 2010, pursuant to title V of the Clean Air Act, EPA issued a title V Permit to Operate (title V permit) to the Mille Lacs Band... permits, which ended April 5, 2010, EPA received comments on the draft title V permit, and revised the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...
Code of Federal Regulations, 2010 CFR
2010-01-01
... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
30 CFR 773.4 - Requirements to obtain permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...
30 CFR 773.4 - Requirements to obtain permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...
30 CFR 773.4 - Requirements to obtain permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...
30 CFR 773.4 - Requirements to obtain permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... a State, no person shall engage in or carry out any surface coal mining operations, unless such... (b) of this section. A permittee need not renew the permit if no surface coal mining operations will...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
40 CFR 52.1834 - Minor source permit to operate program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Minor source permit to operate program... Minor source permit to operate program. Emission limitations and related provisions, which, in accordance with Rule 33-15-14-03, are established as federally enforceable conditions in North Dakota minor...
40 CFR 52.1834 - Minor source permit to operate program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Minor source permit to operate program... Minor source permit to operate program. Emission limitations and related provisions, which, in accordance with Rule 33-15-14-03, are established as federally enforceable conditions in North Dakota minor...
Extension of Interim Approvals of Operating Permits Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Washington's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Texas' Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Determination Regarding Applicability of Federal Operating Permit Requirements
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Renewable Operating Permit Program Air Emission Fees
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Operating Permit Program Approval Issues
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Operating Permits Program Review Process
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Indiana's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Hawaii's Operating Permits Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Initial Operating Permit Application Compliance Certification Policy
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Air Curtain Incinerators and Title V Operating Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Michigan's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for Missouri's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
40 CFR 147.2924 - Area permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...
40 CFR 147.2924 - Area permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...
NASA Astrophysics Data System (ADS)
Rees, S. J.; Jones, Bryan F.
1992-11-01
Once feature extraction has occurred in a processed image, the recognition problem becomes one of defining a set of features which maps sufficiently well onto one of the defined shape/object models to permit a claimed recognition. This process is usually handled by aggregating features until a large enough weighting is obtained to claim membership, or an adequate number of located features are matched to the reference set. A requirement has existed for an operator or measure capable of a more direct assessment of membership/occupancy between feature sets, particularly where the feature sets may be defective representations. Such feature set errors may be caused by noise, by overlapping of objects, and by partial obscuration of features. These problems occur at the point of acquisition: repairing the data would then assume a priori knowledge of the solution. The technique described in this paper offers a set theoretical measure for partial occupancy defined in terms of the set of minimum additions to permit full occupancy and the set of locations of occupancy if such additions are made. As is shown, this technique permits recognition of partial feature sets with quantifiable degrees of uncertainty. A solution to the problems of obscuration and overlapping is therefore available.
47 CFR 80.151 - Classification of operator licenses and endorsements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operator Requirements § 80.151 Classification of... certificate). (5) MP. Marine Radio Operator Permit (radiotelephone operator's restricted certificate). (6) RP. Restricted Radiotelephone Operator Permit (radiotelephone operator's restricted certificate). (7) GOL. GMDSS...
Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-01
The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.
14 CFR 216.5 - Existing permits.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS COMMINGLING OF BLIND SECTOR TRAFFIC BY FOREIGN AIR CARRIERS § 216.5 Existing permits. “Foreign..., authorizing the combined carriage of blind sector traffic as defined in this part, shall continue in effect in...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
30 CFR 773.23 - Suspension or rescission requirements for improvidently issued permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... improvidently issued permits. 773.23 Section 773.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... jurisdiction over the violation; (2) You or your operator no longer own or control the relevant operation; (3...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority--Paradise Fossil... for Air Quality to Tennessee Valley Authority (TVA) for its Paradise Fossil Fuel Plant located near... period. Petitioner submitted a petition regarding the Paradise Fossil Fuel Plant on January 9, 2010...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
... July 14, 2010 response of the CDPHE, Air Pollution Control Division to the October 8, 2009 Order by EPA... ENVIRONMENTAL PROTECTION AGENCY [FRL-9270-5] Clean Air Act Operating Permit Program; Petition for... issued by the Colorado Department of Public Health and Environment (CDPHE). Specifically, the...
75 FR 72719 - Approval and Promulgation of Implementation Plans; Idaho
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
..., provisions relating to Tier 1 operating permits, facility emissions cap, standards of performance of certain... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2008-0482; FRL-9231-1] Approval and... Requirements 7/1/2002 for Tier II Operating Permits. 401 Tier II Operating Permit...... 4/6/2005 Except 401.01...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
40 CFR 68.85 - Hot work permit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...
40 CFR 68.85 - Hot work permit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...
40 CFR 68.85 - Hot work permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...
40 CFR 68.85 - Hot work permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Hot work permit. 68.85 Section 68.85... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...
Hukari, Sirja; Hermann, Ludwig; Nättorp, Anders
2016-01-15
The present paper is based on an analysis of the EU legislation regulating phosphorus recovery and recycling from wastewater stream, in particular as fertiliser. To recover phosphorus, operators need to deal with market regulations, health and environment protection laws. Often, several permits and lengthy authorisation processes for both installation (e.g. environmental impact assessment) and the recovered phosphorus (e.g. End-of-Waste, REACH) are required. Exemptions to certain registration processes for recoverers are in place but rarely applied. National solutions are often needed. Emerging recovery and recycling sectors are affected by legislation in different ways: Wastewater treatment plants are obliged to remove phosphorus but may also recover it in low quantities for operational reasons. Permit processes allowing recovery and recycling operations next to water purification should thus be rationalised. In contrast, the fertiliser industry relies on legal quality requirements, ensuring their market reputation. For start-ups, raw-material sourcing and related legislation will be the key. Phosphorus recycling is governed by fragmented decision-making in regional administrations. Active regulatory support, such as recycling obligation or subsidies, is lacking. Legislation harmonisation, inclusion of recycled phosphorus in existing fertiliser regulations and support of new operators would speed up market penetration of novel technologies, reduce phosphorus losses and safeguard European quality standards.
Response to March 12, 2001 Comments on Louisiana's Title V Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Response to March 12, 2001 Comments on Maryland's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Disapproval of Michigan's Renewable Operating Permit Program Fee Demonstration
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for 34 Clean Air Act Operating Permits Programs in California
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
EPA Review of Proposed Title V Operating Permit for TriGen-Colorado Energy Corporation
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
The Radionuclide NESHAP and the Title V Operating Permits Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Response toEarth Day Coalition's March 9, 2001 Comments on Ohio's Title V Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Update to Sanctions Policy for State Title V Operating Permits Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Air Quality Operating Permits Programs Which Apply to Tribal Lands
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
April 18, 2002 Notice of Deficiency for Ohio's Title V Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Response to March 19, 2001 comments on Ohio's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Agency Review of State Fee Schedules for Operating Permits Programs Under Title V
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Response to March 12, 2001 Comments on Georgia's Title V Operating Permits Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Notice of Deficiency for District of Columbia's Operating Permit Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Relationship Between the Part 70 Operating Permit Program and Section 112(r)
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Questions and Answers on the Requirements of Operating Permits Program Regulations
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Sanctions Policy for State Title V Operating Permits Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Periodic Monitoring Guidance for Title V Operating Permits Programs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
White Paper Number 2 for Improved Implementation of The Part 70 Operating Permits Program
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Application of new electro-optic technology to Space Station Freedom data management system
NASA Technical Reports Server (NTRS)
Husbands, C. R.; Girard, M. M.
1993-01-01
A low risk design methodology to permit the local bus structures to support increased data carrying capacities and to speed messages and data flow between nodes or stations on the Space Station Freedom Data Management System in anticipation of growing requirements was evaluated and recommended. The recommended design employs a collateral fiber optic technique that follows a NATO avionic standard that is developed, tested, and available. Application of this process will permit a potential 25 fold increase in data transfer performance on the local wire bus network with a fiber optic network, maintaining the functionality of the low-speed bus and supporting all of the redundant transmission and fault detection capabilities designed into the existing system. The application of wavelength division multiplexing (WDM) technology to both the local data bus and global data bus segments of the Data Management System to support anticipated additional highspeed data transmission requirements was also examined. Techniques were examined to provide a dual wavelength implementation of the fiber optic collateral networks. This dual wavelength implementation would permit each local bus to support two simultaneous high-speed transfers on the same fiber optic bus structure and operate within the limits of the existing protocol standard. A second WDM study examined the use of spectral sliced technology to provide a fourfold increase in the Fiber Distributed Data Interface (FDDI) global bus networks without requiring modifications to the existing installed cable plant. Computer simulations presented indicated that this data rate improvement can be achieved with commercially available optical components.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Objection to State Operating Permit for Public Service Company of Colorado--Hayden Station AGENCY... of Colorado dba Xcel Energy (Xcel)--Hayden Power Station. Pursuant to section 505(b)(2) of the Clean.... Additionally, the final order for Public Service Company of Colorado--Hayden Power Station, is available...
Code of Federal Regulations, 2010 CFR
2010-07-01
... mining operations. 772.12 Section 772.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... unsuitable for surface coal mining operations. (a) Exploration permit. Any person who intends to conduct coal...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-28
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9765-4] Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State Operating Permit for U.S. Steel-- Granite City Works, Granite... Protection Agency (IEPA) for the U.S. Steel--Granite City Works (USGW) facility, located in Granite City...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... Program; Petition for Objection to State Operating Permit for Cash Creek Generation, LLC--Cash Creek... issued by the Kentucky Division for Air Quality (KDAQ) to Cash Creek Generation, LLC for its Cash Creek Generation Station (Cash Creek) located near Owensboro in Henderson County, Kentucky. This Order constitutes...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
47 CFR 1.1306 - Actions which are categorically excluded from environmental processing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the installation of aerial wire or cable over existing aerial corridors of prior or permitted use or the underground installation of wire or cable along existing underground corridors of prior or permitted use, established by the applicant or others. The use of existing buildings, towers or corridors is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...
Code of Federal Regulations, 2011 CFR
2011-07-01
... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...
Code of Federal Regulations, 2014 CFR
2014-07-01
... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...
Code of Federal Regulations, 2013 CFR
2013-07-01
... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...
Code of Federal Regulations, 2012 CFR
2012-07-01
... REGULATION Acid Rain Permit Contents § 72.51 Permit shield. Each affected unit operated in accordance with the Acid Rain permit that governs the unit and that was issued in compliance with title IV of the Act... operating in compliance with the Acid Rain Program, except as provided in § 72.9(g)(6). [58 FR 3650, Jan. 11...
Code of Federal Regulations, 2010 CFR
2010-07-01
... history of significant non-compliance with regulations or permit conditions. (3) The facility has a demonstrated history of submitting incomplete or deficient permit application information. (4) The facility has... standardized RCRA permit. (2) Circumstances have changed since the time the facility owner or operator applied...
A PC-based simulation of the National Transonic Facitity's safety microprocessor
NASA Technical Reports Server (NTRS)
Thibodeaux, J. J.; Kilgore, W. A.; Balakrishna, S.
1993-01-01
A brief study was undertaken to demonstrate the feasibility of using a state-of-the-art off-the-shelf high speed personal computer for simulating a microprocessor presently used for wind tunnel safety purposes at Langley Research Center's National Transonic Facility (NTF). Currently, there is no active display of tunnel alarm/alert safety information provided to the tunnel operators, but rather such information is periodically recorded on a process monitoring computer printout. This does not provide on-line situational information nor permit rapid identification of safety operational violations which are able to halt tunnel operations. It was therefore decided to simulate the existing algorithms and briefly evaluate a real-time display which could provide both position and trouble shooting information.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-23
... business; (II) The Title V permit failed to provide for the control of mercury emissions, an air... Reasonably Available Control Technology for the control of carbon dioxide emissions or for mercury emissions...
Improved Safety and Efficiency of Protected/Permitted Right-Turns in Oregon
DOT National Transportation Integrated Search
2018-05-01
This research aimed to develop an understanding of the safety and operational implications of using the flashing yellow arrow (FYA) in permitted and protected/permitted right turn (PPRT) operations to maximize safety and efficiency. This report inclu...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
...). Specifically, the Administrator has denied the April 1, 2010, Petition, submitted by WildEarth Guardians... within 60 days from the date this notice appears in the Federal Register, pursuant to section 307 of the... affords EPA a 45-day period to review and object to, as appropriate, a title V operating permit proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
...). Specifically, the Administrator has denied the March, 2010, Petition, submitted by WildEarth Guardians... within 60 days from the date this notice appears in the Federal Register, pursuant to section 307 of the... affords EPA a 45-day period to review and object to, as appropriate, a title V operating permit proposed...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When themore » proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-08
... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...
Louisiana Pacific, Tomahawk, Wisconsin; Petition for Objection to Title V Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
El Dorado Energy, LLC; Order Denying Petition for Objection to Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Title V Permit Objection Communication Strategy
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Permitting Authority, Vol. 1, No. 2
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Permitting Authority, Vol. 2, No. 1
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Ships Docked at Title V Permitted Facilities
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
State Experience Intergrating Pollution Prevention Into Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
PSD and Title V Permitting Guidance for GHGs
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Policy on Title V Permit Program Data Elements
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Section 112 (l) Delegations and Title V Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
NASA Astrophysics Data System (ADS)
Boyce, E. S.; Bierma, R. M.; Willoughby, H.; Feaux, K.; Mattioli, G. S.; Enders, M.; Busby, R. W.
2014-12-01
EarthScope's geodetic component in Alaska, the UNAVCO-operated Plate Boundary Observatory (PBO) network, includes 139 continuous GPS sites and 41 supporting telemetry relays. These are spread across a vast area, from northern AK to the Aleutians. Forty-five of these stations were installed or have been upgraded in cooperation with various partner agencies and currently provide data collection and transmission for more than one group. Leveraging existing infrastructure normally has multiple benefits, such as easier permitting requirements and costs savings through reduced overall construction and maintenance expenses. At some sites, PBO-AK power and communications systems have additional capacity beyond that which is needed for reliable acquisition of GPS data. Where permits allow, such stations could serve as platforms for additional instrumentation or real-time observing needs. With the expansion of the Transportable Array (TA) into Alaska, there is increased interest to leverage existing EarthScope resources for station co-location and telemetry integration. Because of the complexity and difficulty of long-term O&M at PBO sites, however, actual integration of GPS and seismic equipment must be considered on a case-by-case basis. UNAVCO currently operates two integrated GPS/seismic stations in collaboration with the Alaska Earthquake Center, and three with the Alaska Volcano Observatory. By the end of 2014, PBO and TA plan to install another four integrated and/or co-located geodetic and seismic systems. While three of these are designed around existing PBO stations, one will be a completely new TA installation, providing PBO with an opportunity to expand geodetic data collection in Alaska within the limited operations and maintenance phase of the project. We will present some of the design considerations, outcomes, and lessons learned from past and ongoing projects to integrate seismometers and other instrumentation at PBO-Alaska stations. Developing the PBO network as a platform for ongoing research and hazard monitoring equipment may also continue to serve the needs of the research community and the public beyond the sun-setting and completion of EarthScope science plan in 2018.
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
40 CFR Appendix A to Part 70 - Approval Status of State and Local Operating Permits Programs
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Approval Status of State and Local Operating Permits Programs A Appendix A to Part 70 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS Pt. 70, App. A Appendix A to Part 70—Approval Status of State and Local...
Louisville Gas & Electric Trimble Power Station; Petition to Object to REVISED Title V Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Code of Federal Regulations, 2013 CFR
2013-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2014 CFR
2014-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2010 CFR
2010-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
40 CFR 52.2184 - Operating permits for minor sources.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Operating permits for minor sources. 52.2184 Section 52.2184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... permits for minor sources. Emission limitations and related provisions established in South Dakota minor...
40 CFR 52.2184 - Operating permits for minor sources.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Operating permits for minor sources. 52.2184 Section 52.2184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... permits for minor sources. Emission limitations and related provisions established in South Dakota minor...
40 CFR 52.2184 - Operating permits for minor sources.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Operating permits for minor sources. 52.2184 Section 52.2184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... permits for minor sources. Emission limitations and related provisions established in South Dakota minor...
40 CFR 68.85 - Hot work permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...
40 CFR 52.2184 - Operating permits for minor sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52.2184 Section 52.2184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... permits for minor sources. Emission limitations and related provisions established in South Dakota minor...
40 CFR 52.2184 - Operating permits for minor sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Operating permits for minor sources. 52.2184 Section 52.2184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... permits for minor sources. Emission limitations and related provisions established in South Dakota minor...
Waupaca Foundry Plants 2 and 3; Order Denying Petition for Object to Title V Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
2001 Petition Requesting the Administrator Object to Title V Permit For Los Medanos Energy Center
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Feasibility study for convertible engine torque converter
NASA Technical Reports Server (NTRS)
1985-01-01
The feasibility study has shown that a dump/fill type torque converter has excellent potential for the convertible fan/shaft engine. The torque converter space requirement permits internal housing within the normal flow path of a turbofan engine at acceptable engine weight. The unit permits operating the engine in the turboshaft mode by decoupling the fan. To convert to turbofan mode, the torque converter overdrive capability bring the fan speed up to the power turbine speed to permit engagement of a mechanical lockup device when the shaft speed are synchronized. The conversion to turbofan mode can be made without drop of power turbine speed in less than 10 sec. Total thrust delivered to the aircraft by the proprotor, fan, and engine during tansient can be controlled to prevent loss of air speed or altitude. Heat rejection to the oil is low, and additional oil cooling capacity is not required. The turbofan engine aerodynamic design is basically uncompromised by convertibility and allows proper fan design for quiet and efficient cruise operation. Although the results of the feasibility study are exceedingly encouraging, it must be noted that they are based on extrapolation of limited existing data on torque converters. A component test program with three trial torque converter designs and concurrent computer modeling for fluid flow, stress, and dynamics, updated with test results from each unit, is recommended.
Code of Federal Regulations, 2014 CFR
2014-07-01
... title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and... Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.2974 Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and... Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste § 60.2974 Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED INFORMATION § 778.17 Permit...
40 CFR 71.25 - Permit content.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...
40 CFR 71.25 - Permit content.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...
40 CFR 71.25 - Permit content.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...
40 CFR 71.25 - Permit content.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Incorporation of Startup, Shutdown, and Malfunction Plans into Source's Title V Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Use Of Clean Air Act Title V Permit Fees As Match For Section 105 Grants
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
White Paper for Streamlined Development of Part 70 Permit Applications
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Area Source Deferrals and Exemptions from Title V Permitting
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region 10 Question and Answers #2: Title V Permit Development
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region 9 Guidance on EPA's 45-Day Review Period forTitle V Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Comments on the Draft Permit for Conoco Coker and Sulfur Recovery
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Title V Permit Guidance and Template for the Cross-State Air Pollution Rule
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region 4 Formal Objection to the Century Aluminum of Kentucky Title V Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region IV's 1997 Objection to Florida Power and Light Title V Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Periodic Monitoring in Title V Permits for Turbines Subject to NSPS Subpart GG
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Responce to Letter from Congressman Goode Regarding Title V Permit Fees
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Guidance on Coordination Title IV/Title V Permitting Schedules
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Semiannual Title V Permit Data Report (TOPS) and Instructions
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
February 3, 1997 Region V Letter Regarding Title V Permitting Issues
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Supersession and Credible Evidence Language in Title V Permits
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Technical Guidance for Title V Permitting of Printing Facilities
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Procedures for EPA to Address Deficient New Source Permits Under the Clean Air Act
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
NSR and Title V Permitting Applicability for Dynamometer Chassis Testing of Transportation Vehicles
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Guidance on Limiting Potential to Emit in New Source Permitting
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Acid Rain Guidance On Phase II Permitting NOx And Opt-ins
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Follow-up on Tesoro Title V Permit, Boiler #5 Repair and Our Children's Earth Petition
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Region 10 Questions and Answers #1: Title V Permit Development
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
50 CFR 648.15 - Facilitation of enforcement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... surfclam and ocean quahog vessel owners and operators. (1) Surfclam and ocean quahog open access permitted vessels. Vessel owners or operators issued an open access surfclam or ocean quahog open access permit for.../or an Open Access Herring Permit that fished with midwater trawl gear pursuant to § 648.80(d). Such...
50 CFR 648.15 - Facilitation of enforcement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ocean quahog open access permitted vessels. Vessel owners or operators issued an open access surfclam or ocean quahog open access permit for fishing in the ITQ Program, as specified at § 648.70, are required... limited access permitted vessels. Beginning January 1, 2009, vessel owners or operators issued a limited...
77 FR 54382 - Revisions of Five California Clean Air Act Title V Operating Permits Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... Five California Clean Air Act Title V Operating Permits Programs AGENCY: Environmental Protection... Permits (Title V) programs of the Monterey Bay Unified Air Pollution Control District (MBUAPCD), San Luis... thresholds in EPA's Tailoring Rule, which have not been previously subject [[Page 54383
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
...This document announces that the EPA Administrator has responded to a citizen petition asking EPA to object to an operating permit (Permit Number P026R2) issued by the New Mexico Environment Department, Air Quality Bureau (NMED). Specifically, the Administrator has granted the April 14, 2010 petition, submitted by WildEarth Guardians and San Juan Citizens Alliance (Petitioners) to object to the March 19, 2010, operating permit issued to Williams Four Corners, LLC, for the Sims Mesa Central Delivery Point (CDP) compressor station in northwestern Rio Arriba County, New Mexico. Pursuant to sections 307(b) and 505(b)(2) of the Clean Air Act (CAA), a petition for judicial review of those parts of the Order that deny issues in the petition may be filed in the United States Court of Appeals for the appropriate circuit within 60 days from the date this notice appears in the Federal Register.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...Under section 110(k)(6) of the Clean Air Act, EPA is proposing to correct our May 2004 final approval of revisions to the San Joaquin Valley Unified Air Pollution Control District portion of the California State Implementation Plan. EPA is also proposing to take action on three amended District rules, one of which was submitted on March 7, 2008 and the other two of which were submitted on March 17, 2009. Two of the submitted rules reflect revisions to approved District rules that provide for review of new and modified stationary sources (``new source review'' or NSR) within the District, and the third reflects revisions to an approved District rule that provides a mechanism by which existing stationary sources may be exempt from the requirement to secure a Federally-mandated operating permit. The NSR rule revisions relate to exemptions from permitting and from offsets for certain agricultural operations, to the establishment of NSR applicability and offset thresholds consistent with a classification of ``extreme'' nonattainment for the ozone standard, and to the implementation of EPA's NSR Reform Rules. With respect to the revised District NSR rules, EPA is proposing a limited approval and limited disapproval because, although the changes would strengthen the SIP, there are deficiencies in enforceability that prevent full approval. With respect to the operating permit rule, EPA is proposing a full approval. Lastly, EPA is proposing to rescind certain obsolete permitting requirements from the District portion of the California plan. If EPA were to finalize the limited approval and limited disapproval action, as proposed, then a sanctions clock, and EPA's obligation to promulgate a Federal implementation plan, would be triggered because certain revisions to the District rules that are the subject of this action are required under anti-backsliding principles established for the transition from the 1-hour to the 8-hour ozone standard.
METHOD AND APPARATUS FOR PRODUCING INTENSE ENERGETIC GAS DISCHARGES
Bell, P.R.; Luce, J.S.
1960-01-01
A device for producing an energetic gas arc discharge employing the use of gas-fed hollow cathode and anode electrodes is reported. The rate of feed of the gas to the electrodes is regulated to cause complete space charge neutralization to occur within the electrodes. The arc discharge is closely fitted within at least one of the electrodes so tint the gas fed to this electrode is substantially completely ionized before it is emitted into the vacuum chamber. It is this electrode design and the axial potential gradient that exists in the arc which permits the arc to be operated in low pressures and at volthges and currents that permit the arc to be energetic. The use of the large number of energetic ions that are accelerated toward the cathode as a propulsion device for a space vehicle is set forth.
A Data System for a Rapid Evaluation Class of Subscale Aerial Vehicle
NASA Technical Reports Server (NTRS)
Hogge, Edward F.; Quach, Cuong C.; Vazquez, Sixto L.; Hill, Boyd L.
2011-01-01
A low cost, rapid evaluation, test aircraft is used to develop and test airframe damage diagnosis algorithms at Langley Research Center as part of NASA's Aviation Safety Program. The remotely operated subscale aircraft is instrumented with sensors to monitor structural response during flight. Data is collected for good and compromised airframe configurations to develop data driven models for diagnosing airframe state. This paper describes the data acquisition system (DAS) of the rapid evaluation test aircraft. A PC/104 form factor DAS was developed to allow use of Matlab, Simulink simulation code in Langley's existing subscale aircraft flight test infrastructure. The small scale of the test aircraft permitted laboratory testing of the actual flight article under controlled conditions. The low cost and modularity of the DAS permitted adaptation to various flight experiment requirements.
An overview of NASA research on positive displacement general-aviation engines
NASA Technical Reports Server (NTRS)
Kempke, E. E., Jr.
1980-01-01
The research and technology program related to improved and advanced general aviation engines is described. Current research is directed at the near-term improvement of conventional air-cooled spark-ignition piston engines and at future alternative engine systems based on all-new spark-ignition piston engines, lightweight diesels, and rotary combustion engines that show potential for meeting program goals in the midterm and long-term future. The conventional piston engine activities involve efforts on applying existing technology to improve fuel economy, investigation of key processes to permit leaner operation and reduce drag, and the development of cost effective technology to permit flight at high-altitudes where fuel economy and safety are improved. The advanced engine concepts activities include engine conceptual design studies and enabling technology efforts on the critical or key technology items.
30 CFR 780.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.4...
30 CFR 784.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.4...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.29...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.2...
[Anesthetic gases and nurses in operating room].
Dosil Caamaño, Alicia; Dosil Caamaño, Susana
2011-04-01
Summary The growing number of women of childbearing age joining the job market and remaining work active during pregnancy determines the importance of preventing the potential hazards of the workplace during pregnancy and while breastfeeding. We must take into account that regular working practices may not be acceptable for women during pregnancy or while breastfeeding. One of the daily risks of operation theatre nurses is exposure to inhaled anaesthetics used during surgery In most cases, nurses are unaware if exposure is permitted during pregnancy or while breastfeeding. In this article, it is intended to publicize these risks, as well as the ways to prevent, taking into account the existing health and safety laws.
30 CFR 780.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.29 Diversions...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.2 Objectives...
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
40 CFR 267.151 - Wording of the instruments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... owner or operator of a facility with a standardized permit who uses a financial test to demonstrate... financial officer of an owner or operator of a facility with a standardized permit who use a financial test... (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED...
Temporary and Contracted Operations
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Consideration of Fugitives in Open-Air Cattle Operations
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
46 CFR 26.03-8 - Marine Event of National Significance special permits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Marine Event of National Significance special permits... OPERATIONS Special Operating Requirements § 26.03-8 Marine Event of National Significance special permits. (a) For a Marine Event of National Significance, as determined by the Commandant, U.S. Coast Guard, a...
46 CFR 26.03-8 - Marine Event of National Significance special permits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Marine Event of National Significance special permits... OPERATIONS Special Operating Requirements § 26.03-8 Marine Event of National Significance special permits. (a) For a Marine Event of National Significance, as determined by the Commandant, U.S. Coast Guard, a...
46 CFR 26.03-8 - Marine Event of National Significance special permits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Marine Event of National Significance special permits... OPERATIONS Special Operating Requirements § 26.03-8 Marine Event of National Significance special permits. (a) For a Marine Event of National Significance, as determined by the Commandant, U.S. Coast Guard, a...
46 CFR 26.03-8 - Marine Event of National Significance special permits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Marine Event of National Significance special permits... OPERATIONS Special Operating Requirements § 26.03-8 Marine Event of National Significance special permits. (a) For a Marine Event of National Significance, as determined by the Commandant, U.S. Coast Guard, a...
46 CFR 26.03-8 - Marine Event of National Significance special permits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Marine Event of National Significance special permits... OPERATIONS Special Operating Requirements § 26.03-8 Marine Event of National Significance special permits. (a) For a Marine Event of National Significance, as determined by the Commandant, U.S. Coast Guard, a...
47 CFR 1.1306 - Actions which are categorically excluded from environmental processing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... aerial corridors of prior or permitted use or the underground installation of wire or cable along existing underground corridors of prior or permitted use, established by the applicant or others. The use of existing buildings, towers or corridors is an environmentally desirable alternative to the...
List of public hearing & comment period document(s) for the Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay (Modification to Existing Permit LNG Regasification Vessel/DWP Project).
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...
40 CFR 72.83 - Administrative permit amendment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...
40 CFR 72.83 - Administrative permit amendment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...
40 CFR 72.83 - Administrative permit amendment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...
40 CFR 72.83 - Administrative permit amendment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...
40 CFR 72.83 - Administrative permit amendment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) PERMITS REGULATION Permit Revisions § 72.83 Administrative permit amendment. (a) Acid Rain permit... Acid Rain permit, of commencement of operation of qualifying Phase I technology, provided that they are in accordance with § 72.42 of this part; (9) Changes in the date, specified in a new unit's Acid Rain...
25 CFR 167.11 - Tenure of grazing permits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Tenure of grazing permits. (a) All active regular grazing permits shall be for one year and shall be... § 167.8 may become a livestock operator by obtaining an active grazing permit through negotiability or... handle each matter of unused grazing permit or portions of grazing permits on individual merits. Where...
50 CFR 622.17 - South Atlantic golden crab controlled access.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the northern zone. Selection will be made from the list of historical participants in the South... vessel by returning an existing permit or permits to the RA with an application for a permit for the...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Guidance on Major Modification Provisions of PSD Rules as Applied to Re-Permitting at Acme Steel Co.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
40 CFR 52.2590 - Operating permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2590 Operating permits. For... NR 407 of the Wisconsin Administrative Code concern the treatment of sources of greenhouse gas...
40 CFR 52.2590 - Operating permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2590 Operating permits. For... NR 407 of the Wisconsin Administrative Code concern the treatment of sources of greenhouse gas...
40 CFR 52.2590 - Operating permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2590 Operating permits. For... NR 407 of the Wisconsin Administrative Code concern the treatment of sources of greenhouse gas...
40 CFR 52.2590 - Operating permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2590 Operating permits. For... NR 407 of the Wisconsin Administrative Code concern the treatment of sources of greenhouse gas...
Operational and support considerations in standardization
NASA Astrophysics Data System (ADS)
Oreilly, W. T.
Military applications in the era of the 1990's and beyond, require capabilities beyond those available in most existing systems. These capabilities must be provided in a manner that will achieve a low logistic support cost and that can be maintained with relatively inexperienced personnel. This paper presents the design considerations that must be addressed in each of the standardized subsystems and modules that will provide the operational and support needs for tomorrow and beyond. Advanced maintenance concepts, such as two and one level maintenance, are described together with the operational and life cycle cost benefits that will be achieved. A new operation concept called deferred maintenance, which provides sustained operation without maintenance support, is presented. The fault tolerant architecture which will permit a standardized modular design to efficiently accommodate a variety of system applications is presented. The concerns discussed include combat damage survivability, fail safe and fail operational needs, as well as high availability for long life applications as is required for systems employed in the Space Defense Initiative (SDI).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatt, Arpit H; Zhang, Yi Min
A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major sourcemore » threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...
Mining Permits - Division of Mining, Land, and Water
are issued for a term of 1-5 years. An application for a "single year" operation costs $150 ). Federal Operators: If your operation involves federal land managed by the Bureau of Land Management (BLM issues miners the Alaska Pollutant Discharge Elimination System (APDES) General Permit. If the operation
Code of Federal Regulations, 2013 CFR
2013-01-01
... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...
Code of Federal Regulations, 2014 CFR
2014-01-01
... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...
Code of Federal Regulations, 2012 CFR
2012-01-01
... EMBRYOS AND ANIMAL SEMEN Ruminant and Swine Embryos From Regions Where Rinderpest or Foot-and-Mouth Disease Exists § 98.13 Import permit. (a) Ruminant and swine embryos and all test samples required by this... for a permit to import embryos will also serve as the application for a permit to import test samples...
76 FR 9772 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
...) permit program to allow the State to issue research, development, and demonstration (RD&D) permits for... environment. The Director may provide a variance from existing requirements of MSWLF criteria for run-on... demonstrate that compliance with the RD&D permit will not increase risk to human heath and the environment...
Air Permitting Delegations in EPA's New England Region
All Region 1 states have EPA-approved Title V operating permit programs. In addition, all Region 1 states have either SIP-approved NSR/PSD permitting programs or the state has been delegated as the permitting authority for NSR/PSD permits by EPA.
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements. Historical fee rates.
ERIC Educational Resources Information Center
1976
Intended to serve as a practical study guide for those applicants interested in obtaining the Radiotelephone Third Class Operator Permit with the endorsement to operate broadcast radio stations, this manual is also designed to be helpful as a concise reference for those operators already active in the field of broadcasting. Chapters 1 and 2 are…
40 CFR 147.1655 - Requirements for wells authorized by permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... New York § 147.1655 Requirements for wells authorized by permit. (a) The owner or operator of a Class... largest casing string. (b) The owner or operator of a new Class II well authorized by permit shall: (1... volume. (3) For new enhanced recovery wells, install tubing or long string casing extending to the...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
40 CFR 60.4120 - General Hg budget trading program permit requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false General Hg budget trading program... budget trading program permit requirements. (a) For each Hg Budget source required to have a title V operating permit, such permit shall include a Hg Budget permit administered by the permitting authority for...
50 CFR 648.5 - Operator permits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... permits. (a) General. Any operator of a vessel fishing for or possessing: Atlantic sea scallops, NE..., squid, butterfish, scup, black sea bass, or Atlantic bluefish, harvested in or from the EEZ; tilefish... the operator and vessel's fishing, catch, crew size, and pertinent gear (without regard to whether...
50 CFR 648.5 - Operator permits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... permits. (a) General. Any operator of a vessel fishing for or possessing: Atlantic sea scallops, NE..., squid, butterfish, scup, black sea bass, or Atlantic bluefish, harvested in or from the EEZ; tilefish... the operator and vessel's fishing, catch, crew size, and pertinent gear (without regard to whether...
50 CFR 648.5 - Operator permits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Operator permits. 648.5 Section 648.5 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES General Provisions § 648.5 Operator...
40 CFR 270.60 - Permits by rule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.60 Permits by... operator of a barge or other vessel which accepts hazardous waste for ocean disposal, if the owner or...
40 CFR 270.60 - Permits by rule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.60 Permits by... operator of a barge or other vessel which accepts hazardous waste for ocean disposal, if the owner or...
Applicability of NSPS for Coal Preparation to Coal Unloading Operations
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
PSD Applicability Determination for Multiple Owner/Operator Point Sources Within a Single Facility
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
EnerVest San Juan Operations, Title V Applicability Determination
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
16 CFR 300.34 - Reference to existing guaranty on labels not permitted.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Reference to existing guaranty on labels not permitted. 300.34 Section 300.34 Commercial Practices FEDERAL TRADE COMMISSION REGULATIONS UNDER SPECIFIC ACTS OF CONGRESS RULES AND REGULATIONS UNDER THE WOOL PRODUCTS LABELING ACT OF 1939 Guaranties § 300.34...
Autonomous proximity operations using machine vision for trajectory control and pose estimation
NASA Technical Reports Server (NTRS)
Cleghorn, Timothy F.; Sternberg, Stanley R.
1991-01-01
A machine vision algorithm was developed which permits guidance control to be maintained during autonomous proximity operations. At present this algorithm exists as a simulation, running upon an 80386 based personal computer, using a ModelMATE CAD package to render the target vehicle. However, the algorithm is sufficiently simple, so that following off-line training on a known target vehicle, it should run in real time with existing vision hardware. The basis of the algorithm is a sequence of single camera images of the target vehicle, upon which radial transforms were performed. Selected points of the resulting radial signatures are fed through a decision tree, to determine whether the signature matches that of the known reference signatures for a particular view of the target. Based upon recognized scenes, the position of the maneuvering vehicle with respect to the target vehicles can be calculated, and adjustments made in the former's trajectory. In addition, the pose and spin rates of the target satellite can be estimated using this method.
Snakebites in Africa and Europe: a military perspective and update for contemporary operations.
Wilkins, Daniel; Burns, D S; Wilson, D; Warrell, D A; Lamb, L E M
2018-04-05
Snakebite envenoming is rare among military patients, with few cases reported in recent years. Increasingly, however, military operations are taking place in remote parts of Africa, which are inhabited by numerous species of venomous snake, and in Europe, where dangerous species exist but are less common. Bites from a venomous snake may prove fatal, and therefore military medics must be adequately prepared to manage them. This paper reviews the most medically significant species of venomous snake present in Africa and Europe, before suggesting an evidence-based approach to snakebite prevention and management, including possible changes to the UK's Clinical Guidelines for Operations. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Code of Federal Regulations, 2013 CFR
2013-10-01
.../headboat permits for Gulf coastal migratory pelagic fish. 622.373 Section 622.373 Wildlife and Fisheries... for Gulf coastal migratory pelagic fish. (a) No applications for additional charter vessel/headboat permits for Gulf coastal migratory pelagic fish will be accepted. Existing permits may be renewed, are...
Code of Federal Regulations, 2014 CFR
2014-10-01
.../headboat permits for Gulf coastal migratory pelagic fish. 622.373 Section 622.373 Wildlife and Fisheries... for Gulf coastal migratory pelagic fish. (a) No applications for additional charter vessel/headboat permits for Gulf coastal migratory pelagic fish will be accepted. Existing permits may be renewed, are...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... without requiring preconstruction monitoring for particulate matter less than 10 microns (PM 10 ), sulfur dioxide (SO 2 ), hydrogen sulfide (H 2 S), total reduced sulfur (TRS) and sulfuric acid mist; and (5) LDEQ... in the decision-making process. In the 2011 Petition for the modified title V pig iron permit and for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-21
..., submitted by WildEarth Guardians (Petitioner), to object to CDPHE's January 1, 2010, title V permit issued.... Any petition for review shall be filed within 60 days from the date this notice appears in the Federal...: [email protected] . SUPPLEMENTARY INFORMATION: The Act affords EPA a 45-day period to review and...
40 CFR 72.32 - Permit application shield and binding effect of permit application.
Code of Federal Regulations, 2014 CFR
2014-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...
40 CFR 72.32 - Permit application shield and binding effect of permit application.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...
40 CFR 72.32 - Permit application shield and binding effect of permit application.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...
40 CFR 72.32 - Permit application shield and binding effect of permit application.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...
40 CFR 72.32 - Permit application shield and binding effect of permit application.
Code of Federal Regulations, 2013 CFR
2013-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...
NPDES Permit for Wesco Operating, Inc., Lander Field in Wyoming
Indian Country, Minor, indust., non-discharge, permit WY-0000221 Wesco Operating, Inc., is directed to have no discharge from the Lander Field NW Discharge oil production site in Fremont County, Wyoming.
Optimizing liquid effluent monitoring at a large nuclear complex.
Chou, Charissa J; Barnett, D Brent; Johnson, Vernon G; Olson, Phil M
2003-12-01
Effluent monitoring typically requires a large number of analytes and samples during the initial or startup phase of a facility. Once a baseline is established, the analyte list and sampling frequency may be reduced. Although there is a large body of literature relevant to the initial design, few, if any, published papers exist on updating established effluent monitoring programs. This paper statistically evaluates four years of baseline data to optimize the liquid effluent monitoring efficiency of a centralized waste treatment and disposal facility at a large defense nuclear complex. Specific objectives were to: (1) assess temporal variability in analyte concentrations, (2) determine operational factors contributing to waste stream variability, (3) assess the probability of exceeding permit limits, and (4) streamline the sampling and analysis regime. Results indicated that the probability of exceeding permit limits was one in a million under normal facility operating conditions, sampling frequency could be reduced, and several analytes could be eliminated. Furthermore, indicators such as gross alpha and gross beta measurements could be used in lieu of more expensive specific isotopic analyses (radium, cesium-137, and strontium-90) for routine monitoring. Study results were used by the state regulatory agency to modify monitoring requirements for a new discharge permit, resulting in an annual cost savings of US dollars 223,000. This case study demonstrates that statistical evaluation of effluent contaminant variability coupled with process knowledge can help plant managers and regulators streamline analyte lists and sampling frequencies based on detection history and environmental risk.
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
77 FR 8896 - Notice of Proposed Information Collection for 1029-0036
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... request for Surface Mining Permit Applications--Minimum Requirements for Reclamation and Operation Plan... Permit Applications-- Minimum Requirements for Reclamation and Operation Plan. OSM is requesting a 3-year... Requirements for Reclamation and Operation Plan. OMB Control Number: 1029-0036. SUMMARY: Sections 507(b), 508(a...
Code of Federal Regulations, 2012 CFR
2012-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2011 CFR
2011-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2010 CFR
2010-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2013 CFR
2013-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2014 CFR
2014-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
76 FR 454 - Hazardous Materials Transportation: Revisions of Special Permits Procedures
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-05
... the agency to evaluate the applicant's fitness and the safety impact of operations that would be... applicant granted a special permit undergoes a safety fitness evaluation, further assuring the safety of... operations to enable the agency to evaluate the applicant's fitness and the safety impact of operations that...
Control techniques for an automated mixed traffic vehicle
NASA Technical Reports Server (NTRS)
Meisenholder, G. W.; Johnston, A. R.
1977-01-01
The paper describes an automated mixed traffic vehicle (AMTV), a driverless low-speed tram designed to operate in mixed pedestrian and vehicular traffic. The vehicle is a six-passenger electric tram equipped with sensing and control which permit it to function on existing streets in an automatic mode. The design includes established wire-following techniques for steering and near-IR headway sensors. A 7-mph cruise speed is reduced to 2 mph or a complete stop in response to sensor (or passenger) inputs. The AMTV performance is evaluated by operation on a loop route and by simulation. Some necessary improvements involving sensors, sensor pattern, use of an audible signal, and control lag are discussed. It is suggested that appropriate modifications will eliminate collision incidents.
Analysis of Electric Power Board of Chattanooga Smart Grid Investment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Starke, Michael; Ollis, Ben; Glass, Jim
The deployment of a Smart Grid within the EPB electrical system has brought significant value to EPB customers and to EPB operations. The Smart Grid implementation has permitted the capability to automate many of the existing systems, increasing the overall efficiency and decreasing round trip time for many required operation functions. This has both reduced the cost of operations and increased the reliability of customer service. This boost in performance can be primarily linked to two main components: the communication network and the availability of data. The existence of a fiber communication backbone has opened numerous opportunities for EPB. Largemore » data sets from remote devices can be continuously polled and used to compute numerous metrics. The speed of communication has provided a pathway to sophisticated distribution automation that would not otherwise be possible. The data have been shown to provide a much broader view of the actual electrical system that was not previously available, opening many new opportunities in data analytics. This report documents many of the existing systems and operational features of the EPB system. Many of these systems have seen significant improvement with the deployment of Smart Grid technologies. The research behind this report found that in some cases, the value was directly computable or estimable for these enhancements. Currently, several ongoing research topics are under investigation within EPB. Through a grant from TVA, EPB is currently installing a 1.3MW solar photovoltaic system, which will be the first-generation asset owned by EPB.« less
30 CFR 778.12 - Providing permit history information.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED...
Pollution prevention applications in batch manufacturing operations
NASA Astrophysics Data System (ADS)
Sykes, Derek W.; O'Shaughnessy, James
2004-02-01
Older, "low-tech" batch manufacturing operations are often fertile grounds for gains resulting from pollution prevention techniques. This paper presents a pollution prevention technique utilized for wastewater discharge permit compliance purposes at a batch manufacturer of detergents, deodorants, and floor-care products. This manufacturer generated industrial wastewater as a result of equipment rinses required after each product batch changeover. After investing a significant amount of capital on end of pip-line wastewater treatment technology designed to address existing discharge limits, this manufacturer chose to investigate alternate, low-cost approaches to address anticipated new permit limits. Mass balances using spreadsheets and readily available formulation and production data were conducted on over 300 products to determine how each individual product contributed to the total wastewater pollutant load. These mass balances indicated that 22 products accounted for over 55% of the wastewater pollutant. Laboratory tests were conducted to determine whether these same products could accept their individual changeover rinse water as make-up water in formulations without sacrificing product quality. This changeover reuse technique was then implement at the plant scale for selected products. Significant reductions in wastewater volume (25%) and wastewater pollutant loading (85+%) were realized as a direct result of this approach.
Wesco Operating Inc., Lander Field NPDES Proposed Permit
Indian Country, Minor, indust., non-discharge, proposed permit WY-0000221 establishes monitoring and reporting provisions should an unauthorized release of produced water occur from the Wesco Operating, Inc., Lander Field NW Discharge oil production site.
NPDES Permit for Wesco Operating, Inc. – Maverick Springs in Wyoming
Under NPDES permit WY-0000469, Wesco Operating, Inc. - Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... exists only if accompanied by import permits issued by the Animal and Plant Health Inspection Service (APHIS). (b) An application for the import permits must be submitted to the Animal and Plant Health...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... exists only if accompanied by import permits issued by the Animal and Plant Health Inspection Service (APHIS). (b) An application for the import permits must be submitted to the Animal and Plant Health...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
... as listed below. A copy of the Region's responses to comments and the final permit may be obtained... testing requirements for discharges containing methanol up to 20 bbl/ event and ethylene glycol up to 200...
Hanford facility dangerous waste permit application, general information portion. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sonnichsen, J.C.
1997-08-21
For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less
Clarification on Fugitive Emissions Policy
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition Requesting the Admistrator to Object to Title V Operating Permit Issued to Noranda Alumina
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Guidance on Annual Compliance Certifications
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
December 6, 2000, Kentucky Notice of Deficiency
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition to Object to the Nucor Steel, St. James Parish, Louisiana Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Columbia Gerating Station, Pardeeville, Wisonconsin Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Potlatch Corporation, Order Denying Petition for Objection to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Portland Generating Station, Order Denying Petition for Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition to Object to the Edgewater Power Plant, Sheboygan County, Wisconsin, Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition to Object to the VIM Recycling, Inc., Elkhart, Indiana, Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
King Finishing, Order Granting Remanded Issue on Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Georgetown Cogeneration Project as a Minor Source
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
January 21,1993 Letter To Wallace N. Davis
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Oak Creek Power Plant, Oak Creek, Wisconsin Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Order Denying Petition to Object to Operating Permit for TVA's Shawnee Fossil Plant
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition for Administrator to Object to Borden Chemical, Inc. State Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Salt River Project San Tan Generating Station, Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Summit Petroleum Corporation Single Source Determination
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Response to Request to Object to Pacific Coast Buliding Products, Inc. (PABCO) Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition to Object to the Carmeuse Lime and Stone Plant, Manitowoc, Wisconsin, Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Great Salt Lake Minerals Source Determination
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Petition to Object to the Luke Paper Company, Luke, Maryland, Title V Operation Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Watts Bar Nuclear Plant Title V Applicability
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Letter to Bay Area on Periodic Monitoring
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Pope and Talbot, Inc., Petition for Objection to Issuance of Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
American Colloid Company, Petition to Object to Title V Operating Permit
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Title V Applicability for Fort Drum
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Source Determinations for Oil and Gas Industries
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Tesoro (BP Amoco) Consent Decree
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
40 CFR Part 60, Supbart GG, Applicability Determination
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Clarification of Title I Modifications
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.