Sample records for existing power contracts

  1. 7 CFR 1786.163 - Existing wholesale power contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contracts. (a) If the borrower is a party to a wholesale power contract with a power supply borrower financed pursuant to the RE Act, the Administrator may require that the borrower and the power supply... follows: Sample Contract Terms So long as any of the notes evidencing secured loans of the power supply...

  2. 7 CFR 1786.163 - Existing wholesale power contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contracts. (a) If the borrower is a party to a wholesale power contract with a power supply borrower financed pursuant to the RE Act, the Administrator may require that the borrower and the power supply... follows: Sample Contract Terms So long as any of the notes evidencing secured loans of the power supply...

  3. 7 CFR 1710.303 - Power cost studies-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contracts or revisions to existing contracts, and an analysis of the effects on power costs; (4) Use of sensitivity analyses to determine the vulnerability of the alternatives to a reasonable range of assumptions... conservation alternatives as set forth in §§ 1710.253 and 1710.254; (2) A present-value analysis of the costs...

  4. Reformation of PURPA contracts: Strategies for success in power marketing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scalzo, P.J.

    With the passage of the Energy Policy Act of 1992, real competition entered into the world of electric utilities. A slide presentations is given on reformation of Public Utility Regulatory Policies Act (PURPA) Contracts for success in power marketing strategies. Two ways to compete: Be the least cost provider or add value and `sell hard`. The PURPA vision was to increase efficiency in power generation, utilize renewable or waste fuels, and bolster the independent producers. Cogenerators and small power producers qualified. Utility planners predicted, avoided cost, utility loads, and oil and gas prices to increase. However, avoided costs, and oilmore » and gase prices declined. Two scenarios are discussed for contract reformation: Contract buyouts, and renegotiation of contracts. Options for for dealing with existing fuel agreements are presented.« less

  5. Committing to coal and gas: Long-term contracts, regulation, and fuel switching in power generation

    NASA Astrophysics Data System (ADS)

    Rice, Michael

    Fuel switching in the electricity sector has important economic and environmental consequences. In the United States, the increased supply of gas during the last decade has led to substantial switching in the short term. Fuel switching is constrained, however, by the existing infrastructure. The power generation infrastructure, in turn, represents commitments to specific sources of energy over the long term. This dissertation explores fuel contracts as the link between short-term price response and long-term plant investments. Contracting choices enable power plant investments that are relationship-specific, often regulated, and face uncertainty. Many power plants are subject to both hold-up in investment and cost-of-service regulation. I find that capital bias is robust when considering either irreversibility or hold-up due to the uncertain arrival of an outside option. For sunk capital, the rental rate is inappropriate for determining capital bias. Instead, capital bias depends on the regulated rate of return, discount rate, and depreciation schedule. If policies such as emissions regulations increase fuel-switching flexibility, this can lead to capital bias. Cost-of-service regulation can shorten the duration of a long-term contract. From the firm's perspective, the existing literature provides limited guidance when bargaining and writing contracts for fuel procurement. I develop a stochastic programming framework to optimize long-term contracting decisions under both endogenous and exogenous sources of hold-up risk. These typically include policy changes, price shocks, availability of fuel, and volatility in derived demand. For price risks, the optimal contract duration is the moment when the expected benefits of the contract are just outweighed by the expected opportunity costs of remaining in the contract. I prove that imposing early renegotiation costs decreases contract duration. Finally, I provide an empirical approach to show how coal contracts can limit short-term fuel switching in power production. During the era prior to shale gas and electricity market deregulation, I do not find evidence that gas generation substituted for coal in response to fuel price changes. However, I do find evidence that coal plant operations are constrained by fuel contracts. As the min-take commitment to coal increases, changes to annual coal plant output decrease. My conclusions are robust in spite of bias due to the selective reporting of proprietary coal delivery contracts by utilities.

  6. The effects of rebate contracts on the health care system.

    PubMed

    Graf, Julia

    2014-06-01

    Group purchasing organizations gain increasing importance with respect to the supply of pharmaceutical products and frequently use multiple, exclusive or partially exclusive rebate contracts to exercise market power. Based on a Hotelling model of horizontal and vertical product differentiation, we examine the controversy around whether a superior rebate scheme exists, as far as consumer surplus, firms' profits and total welfare are concerned. We find that firms clearly prefer partially exclusive over multiple, and multiple over exclusive rebate contracts. In contrast, no rebate form exists that lowers total costs per se for the consumers or maximizes total welfare.

  7. 10 CFR 905.34 - Adjustment provisions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Power Marketing Initiative § 905.34 Adjustment...-term firm power contracts only as required to respond to changes in hydrology and river operations... the date that existing contractual commitments expire. Any adjustment shall only take place after an...

  8. 7 CFR 1717.854 - Advance approval-100 percent private financing of distribution, subtransmission and headquarters...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... mortgage, the RUS loan contract, the borrower's wholesale power contract, any debt restructuring agreement... debt; (2) The ratio of the borrower's equity, less deferred expenses, to total assets, less deferred...-term debt is not less than 1.0, after adding the principal amount of the proposed loan to the existing...

  9. 7 CFR 1717.854 - Advance approval-100 percent private financing of distribution, subtransmission and headquarters...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... mortgage, the RUS loan contract, the borrower's wholesale power contract, any debt restructuring agreement... debt; (2) The ratio of the borrower's equity, less deferred expenses, to total assets, less deferred...-term debt is not less than 1.0, after adding the principal amount of the proposed loan to the existing...

  10. 7 CFR 1717.854 - Advance approval-100 percent private financing of distribution, subtransmission and headquarters...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... mortgage, the RUS loan contract, the borrower's wholesale power contract, any debt restructuring agreement... debt; (2) The ratio of the borrower's equity, less deferred expenses, to total assets, less deferred...-term debt is not less than 1.0, after adding the principal amount of the proposed loan to the existing...

  11. 7 CFR 1717.854 - Advance approval-100 percent private financing of distribution, subtransmission and headquarters...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... mortgage, the RUS loan contract, the borrower's wholesale power contract, any debt restructuring agreement... debt; (2) The ratio of the borrower's equity, less deferred expenses, to total assets, less deferred...-term debt is not less than 1.0, after adding the principal amount of the proposed loan to the existing...

  12. 10 CFR 905.31 - Term.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Term. 905.31 Section 905.31 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Power Marketing Initiative § 905.31 Term. Western will extend resource commitments for 20 years from the date existing contracts expire to existing customers with long...

  13. High Speed Balancing Applied to the T700 Engine

    NASA Technical Reports Server (NTRS)

    Walton, J.; Lee, C.; Martin, M.

    1989-01-01

    The work performed under Contracts NAS3-23929 and NAS3-24633 is presented. MTI evaluated the feasibility of high-speed balancing for both the T700 power turbine rotor and the compressor rotor. Modifications were designed for the existing Corpus Christi Army Depot (CCAD) T53/T55 high-speed balancing system for balancing T700 power turbine rotors. Tests conducted under these contracts included a high-speed balancing evaluation for T700 power turbines in the Army/NASA drivetrain facility at MTI. The high-speed balancing tests demonstrated the reduction of vibration amplitudes at operating speed for both low-speed balanced and non-low-speed balanced T700 power turbines. In addition, vibration data from acceptance tests of T53, T55, and T700 engines were analyzed and a vibration diagnostic procedure developed.

  14. Lac Courte Oreilles Hydro Dam Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Jason; Meyers, Amy

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  15. U. K. to resume natural gas imports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-17

    This paper reports that the U.K. government has opened the way for resuming gas imports into Britain by approving a contract signed by U.K. electric power utility National Power to buy gas from Norway. A new joint marketing venture of BP Exploration, Den norske stats oljeselskap AS (Statoil), and Norsk Hydro AS also will be allowed to import gas for electric power plant fuel once it has a contract. National Power and the BP/Statoil/Norsk Hydro group will use the Frigg pipeline from Norwegian waters into St. Fergus, north of Aberdeen, the only existing link between the British transmission system andmore » foreign supplies of gas. Meantime, progress is under way toward a second pipeline to link the U.K. with foreign natural gas supplies, calling for a pipeline across the English Channel joining the continental European pipeline system to the U.K. network.« less

  16. 10 CFR 905.34 - Adjustment provisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... continue to take place based on existing contract/marketing criteria principles. ... 10 Energy 4 2010-01-01 2010-01-01 false Adjustment provisions. 905.34 Section 905.34 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Power Marketing Initiative § 905.34 Adjustment...

  17. Standby power generation under utility curtailment contract agreements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nolan, G.J.; Puccio, V.J.; Calhoun, C.W.

    1995-12-31

    Many utilities in the US offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. If the required curtailment is not achieved by the customer within the allocated time period, stiff financial penalties are usually enforced by the utility. The attractiveness of the contract rates usually is proportional to the amount of curtailment required. To take advantage of these attractive rates, a customer must be able to withstand themore » curtailment without supplemental generation or must add standby generation to meet its needs. Obviously, the cost of the curtailments to the customer should not exceed the economic benefits of reduced rates. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing Helicopters of Philadelphia, Pennsylvania required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.« less

  18. Correlates Between Force and Postural Tremor in Older Individuals with Essential Tremor.

    PubMed

    Kavanagh, Justin J; Keogh, Justin W L

    2016-12-01

    Essential tremor (ET) is commonly associated with kinetic tremor. However, other forms of tremor, such as force and postural tremor, may occur in ET with less severity. This study objectively assessed force and postural tremor characteristics in ET with the purpose of identifying the relationships between these tremors. Ten individuals with ET (age 71 ± 5 years) and ten healthy controls (age 70 ± 5 years) participated in the study. Force tremor was quantified as fluctuations in index finger abduction force during isometric contractions at 10 % maximum voluntary contraction (MVC) and 60 % MVC. Postural tremor was quantified as index finger acceleration when the subjects held their entire arm unsupported, and when their arm was supported so that only the index finger could move. Time- and frequency-domain parameters were extracted from tremor data, and then correlations within, and between, tremor subtypes were examined. ET force tremor was dependent on contraction intensity whereas postural tremor was unaffected by the level of limb support. Significant correlations existed between frequency components of postural tremor and force tremor amplitude. Force tremor amplitude normalised to the level of contraction intensity correlated to the proportion of power for postural tremor. These correlations were observed for both contraction intensities and both levels of postural support. The proportion of power represents the output of central oscillators in ET patients and therefore correlated well to force tremor. Given that significant relationships existed between spectral features of postural tremor and the overall force tremor amplitude, it is clear that these tremor modalities are not completely independent in older adults with ET.

  19. 7 CFR 1786.163 - Existing wholesale power contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... borrower and the Administrator, take or suffer to be taken any steps for reorganization or dissolution, or..., reorganization, dissolution, consolidation, or merger, or to any such sale, lease or transfer (or any agreement..., the borrower may take or suffer to be taken any steps for reorganization or dissolution or to...

  20. 7 CFR 1786.163 - Existing wholesale power contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... borrower and the Administrator, take or suffer to be taken any steps for reorganization or dissolution, or..., reorganization, dissolution, consolidation, or merger, or to any such sale, lease or transfer (or any agreement..., the borrower may take or suffer to be taken any steps for reorganization or dissolution or to...

  1. 7 CFR 1786.163 - Existing wholesale power contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... borrower and the Administrator, take or suffer to be taken any steps for reorganization or dissolution, or..., reorganization, dissolution, consolidation, or merger, or to any such sale, lease or transfer (or any agreement..., the borrower may take or suffer to be taken any steps for reorganization or dissolution or to...

  2. The design of optimal electric power demand management contracts

    NASA Astrophysics Data System (ADS)

    Fahrioglu, Murat

    1999-11-01

    Our society derives a quantifiable benefit from electric power. In particular, forced outages or blackouts have enormous consequences on society, one of which is loss of economic surplus. Electric utilities try to provide reliable supply of electric power to their customers. Maximum customer benefit derives from minimum cost and sufficient supply availability. Customers willing to share in "availability risk" can derive further benefit by participating in controlled outage programs. Specifically, whenever utilities foresee dangerous loading patterns, there is a need for a rapid reduction in demand either system-wide or at specific locations. The utility needs to get relief in order to solve its problems quickly and efficiently. This relief can come from customers who agree to curtail their loads upon request in exchange for an incentive fee. This thesis shows how utilities can get efficient load relief while maximizing their economic benefit. This work also shows how estimated customer cost functions can be calibrated, using existing utility data, to help in designing efficient demand management contracts. In order to design such contracts, optimal mechanism design is adopted from "Game Theory" and applied to the interaction between a utility and its customers. The idea behind mechanism design is to design an incentive structure that encourages customers to sign up for the right contract and reveal their true value of power. If a utility has demand management contracts with customers at critical locations, most operational problems can be solved efficiently. This thesis illustrates how locational attributes of customers incorporated into demand management contract design can have a significant impact in solving system problems. This kind of demand management contracts can also be used by an Independent System Operator (ISO). During times of congestion a loss of economic surplus occurs. When the market is too slow or cannot help relieve congestion, demand management can help solve the problem. Another tool the ISO requires for security purposes is reserves. Even though demand management contracts may not be a good substitute for spinning reserves, they are adequate to augment or replace supplemental and backup reserves.

  3. Swelling and Contraction of Corn Mitochondria 1

    PubMed Central

    Stoner, C. D.; Hanson, J. B.

    1966-01-01

    A survey has been made of the properties of corn mitochondria in swelling and contraction. The mitochondria swell spontaneously in KCl but not in sucrose. Aged mitochondria will swell rapidly in sucrose if treated with citrate or EDTA. Swelling does not impair oxidative phosphorylation if bovine serum albumin is present. Contraction can be maintained or initiated with ATP + Mg or an oxidizable substrate, contraction being more rapid with the substrate. Magnesium is not required for substrate powered contraction. Contraction powered by ATP is accompanied by the release of phosphate. Oligomycin inhibits both ATP-powered contraction and the release of phosphate. However, it does not affect substrate-powered contraction. Substrate powered contraction is inhibited by electron-transport inhibitors. The uncoupler, carbonyl cyanide m-chlorophenyl hydrazone, accelerates swelling and inhibits both ATP-and substrate-powered contraction. However, the concentrations required are well in excess of those required to produce uncoupling and to accelerate adenosine triphosphatase; the concentrations required inhibit respiration in a phosphorylating medium. Phosphate is a very effective inhibitor of succinate-powered contraction. Neither oligomycin nor Mg affects the phosphate inhibition. Phosphate is less inhibitory with the ATP-powered contraction. The results are discussed in terms of a hypothesis that contraction is associated with a nonphosphorylated high energy intermediate of oxidative phosphorylation. Images PMID:16656248

  4. Strength, power output and symmetry of leg muscles: effect of age and history of falling.

    PubMed

    Perry, Mark C; Carville, Serena F; Smith, I Christopher H; Rutherford, Olga M; Newham, Di J

    2007-07-01

    Risk factors for medically unexplained falls may include reduced muscle power, strength and asymmetry in the lower limbs. Conflicting reports exist about strength and there is little information about power and symmetry. Forty-four healthy young people (29.3 +/- 0.6 years), 44 older non-fallers (75.9 +/- 0.6 years), and 34 older fallers (76.4 +/- 0.8 years) were studied. Isometric, concentric and eccentric strength of the knee and ankle muscles and leg extension power were measured bilaterally. The younger group was stronger in all muscles and types of contraction than both older groups (P < 0.02-0.0001). Strength differences between the older groups occasionally reached significance in individual muscles and types of contraction but overall the fallers had 85% of the strength and 79% of the power of the non-fallers (P < 0.001). Young subjects generated more power than both older groups (P < 0.0001) and the fallers generated less than the non-fallers (P = 0.03). Strength symmetry showed an inconsistent age effect in some muscles and some contraction types. This was similar overall in the two older groups. Both older groups had greater asymmetry in power than the young (P < 0.02-0.004). Power asymmetry tended to be greater in the fallers than the non-fallers but this did not reach significance. These data do not support the suggestion that asymmetry of strength and power are associated with either increasing age or fall history. Power output showed clear differences between age groups and fall status and appears to be the most relevant measurement of fall risk and highlights the cumulative effects on function of small changes in strength in individual muscle groups.

  5. Nickel-hydrogen battery integration study for the Multimission Modular Spacecraft

    NASA Technical Reports Server (NTRS)

    Mueller, V. C.

    1980-01-01

    A study has been performed to determine the feasibility of using nickel-hydrogen batteries as replacements for the nickel-cadmium batteries currently used for energy storage in the Multimission Modular Spacecraft under a contract with NASA Goddard Space Flight Center. The battery configuration was selected such that it meets volumetric and mounting constraints of the existing battery location, interfaces electrically with existing power conditioning and distribution equipment, and maintains acceptable cell operating temperatures. The battery contains 21, 50 ampere-hour cells in a cast aluminum structural frame. Cells used in the battery design are those developed under the Air Force's Aero Propulsion Laboratory funding and direction. Modifications of the thermal control system were necessary to increase the average output power capability of the Modular Power Subsystem.

  6. Local Voltage Control in Distribution Networks: A Game-Theoretic Perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Xinyang; Tian, Jie; Chen, Lijun

    Inverter-based voltage regulation is gaining importance to alleviate emerging reliability and power-quality concerns related to distribution systems with high penetration of photovoltaic (PV) systems. This paper seeks contribution in the domain of reactive power compensation by establishing stability of local Volt/VAr controllers. In lieu of the approximate linear surrogate used in the existing work, the paper establishes existence and uniqueness of an equilibrium point using nonlinear AC power flow model. Key to this end is to consider a nonlinear dynamical system with non-incremental local Volt/VAr control, cast the Volt/VAr dynamics as a game, and leverage the fixed-point theorem as wellmore » as pertinent contraction mapping argument. Numerical examples are provided to complement the analytical results.« less

  7. Local Voltage Control in Distribution Networks: A Game-Theoretic Perspective: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Xinyang; Tian, Jie; Chen, Lijun

    Inverter-based voltage regulation is gaining importance to alleviate emerging reliability and power-quality concerns related to distribution systems with high penetration of photovoltaic (PV) systems. This paper seeks contribution in the domain of reactive power compensation by establishing stability of local Volt/VAr controllers. In lieu of the approximate linear surrogate used in the existing work, the paper establishes existence and uniqueness of an equilibrium point using nonlinear AC power flow model. Key to this end is to consider a nonlinear dynamical system with non-incremental local Volt/VAr control, cast the Volt/VAr dynamics as a game, and leverage the fixed-point theorem as wellmore » as pertinent contraction mapping argument. Numerical examples are provided to complement the analytical results.« less

  8. 24 CFR 235.1234 - Term of assistance payment contract in connection with mortgages insured under section 235(r) of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... (a) Existing contracts with original terms in excess of ten years. In cases where the existing contract has an original term in excess of ten years, the term of the new assistance payments contract in.... (b) Existing ten year contracts. (1) In cases of existing ten year contracts, the term of the new...

  9. Reliability of burst superimposed technique to assess central activation failure during fatiguing contraction.

    PubMed

    Dousset, Erick; Jammes, Yves

    2003-04-01

    Recording a superimposed electrically-induced contraction at the limit of endurance during voluntary contraction is used as an indicator of failure of muscle activation by the central nervous system and discards the existence of peripheral muscle fatigue. We questioned on the reliability of this method by using other means to explore peripheral muscle failure. Fifteen normal subjects sustained handgrip at 60% of maximal voluntary contraction (MVC) until exhaustion. During sustained contraction, the power spectrum analysis of the flexor digitorum surface electromyogram allowed us to calculate the leftward shift of median frequency (MF). A superimposed 60 Hz 3 s pulse train (burst superimposition) was delivered to the muscle when force levelled off close to the preset value. Immediately after the fatigue trial had ended, the subject was asked to perform a 5 s 60% MVC and we measured the peak contractile response to a 60 Hz 3 s burst stimulation. Recordings of the compound evoked muscle action potential (M-wave) allowed us to explore an impairment of neuromuscular propagation. A superimposed contraction was measured in 7 subjects in their two forearms, whereas it was absent in the 8 others. Despite these discrepancies, all subjects were able to reproduce a 3 s 60% MVC immediately after the fatigue trial ended and there was no post-fatigue decrease of contraction elicited by the 60 Hz 3 s burst stimulation, as well as no M-wave decrease in amplitude and conduction time. Thus, there was no indication of peripheral muscle fatigue. MF decrease was present in all individuals throughout the fatiguing contraction and it was not correlated with the magnitude of superimposed force. These observations indicate that an absence of superimposed electrically-induced muscle contraction does not allow us to conclude the existence of a sole peripheral muscle fatigue in these circumstances.

  10. Electronic Joint Army/Navy Point Detonating/Delay Fuze

    DTIC Science & Technology

    1982-08-01

    be battery powered and will use an existing S & A , such as an M739 . We recormiended that the fuzes be fired at various zones and high-speed cameras...Demonstrator 10 Power Supply Tasks 47 11 Electronic S & A 43 11.1 Explosive Barrier Module 49 11.2 Internal Development Program 51 12 Fuze Packaging...program, contract number DAAK10-80-C-0049. We included the Electronic S & A and Fuze Packaging sections to present a complete understanding of the overall

  11. Optimizing the Operation of Windfarms, Energy Storage and Flexible Loads in Modern Power Systems and Deregulated Electricity Markets

    NASA Astrophysics Data System (ADS)

    Dar, Zamiyad

    The amount of wind energy in power systems is increasing at a significant rate. With this increased penetration, there are certain problems associated with the operation of windfarms which need careful attention. In the operations side, the wake effects of upstream wind turbines on downstream wind turbines can cause a reduction in the total generated power of a windfarm. On the market side, the fluctuation of real-time prices can make the operation of windfarms less profitable. Similarly, the intermittent nature of wind power prevents the windfarms from participating in the day-ahead and forward markets. On the system side, the volatile nature of wind speeds is also an obstacle for windfarms to provide frequency regulation to the system. In this thesis, we address these issues and optimize the operation of windfarms in power systems and deregulated electricity markets. First, the total power generation in a windfarm is maximized by using yaw angle of wind turbines as a control variable. We extend the existing wake models to include the effects of yaw misalignment and wake deflection of wind turbines. A numerical study is performed to find the optimal values of induction factor and yaw misalignment angle of wind turbines in a single row of a windfarm for achieving the maximum total power with wake effects. The numerical study shows that the maximum power is achieved by keeping the induction factor close to 1/3 and only changing the yaw angle to deflect the wake. We then propose a Dynamic Programming Framework (DPF) to maximize the total power production of a windfarm using yaw angle as the control variable. We compare the windfarm efficiency achieved with our DPF with the efficiency values obtained through greedy control strategy and induction factor optimization. We also extend our expressions to a windfarm with multiple rows and columns of turbines and perform simulations on the 3x3 and 4x4 grid topologies. Our results show that the optimal induction factor for most turbines is quite close to 1/3 and yaw angle acts as the dominant optimization variable. In the next part of this dissertation, a system comprising of a windfarm and energy storage operating in real-time electricity markets is studied. An Energy-balancing Threshold Price (ETP) policy is proposed to maximize the revenue of a windfarm with on-site storage. We propose and analyze a scheme for a windfarm to store or sell energy based on a threshold price. The threshold price is calculated based on long-term distributions of the electricity price and wind power generation processes, and is chosen so as to balance the energy flows in and out of the storage-equipped windfarm. It is also shown mathematically that the proposed policy is optimal in terms of the long-term revenue generated. Comparing it with the optimal policy that has knowledge of the future, we observe that the revenue obtained by the proposed ETP policy is approximately 90% of the maximum attainable revenue at a storage capacity of 10-15 times the power rating of the windfarm. The intermittent nature of wind power is a hindrance to the efficient participation of windfarms in the day-ahead and forward electricity markets. In this regard, a flexible forward contract is proposed in this dissertation which allows the windfarms to enter into a forward contract with flexible load with an option to deviate from the contracted amount of power. Using such a flexible contract would allow the windfarms to supply more or less than the contracted amount of power in case of unexpected wind conditions or real-time prices. We also propose models for forecasting wind power and real-time electricity prices. The comparison between the proposed contracting framework and a simple fixed contract (currently existing in the market) for different levels of flexibility and load shows that there is a net gain in windfarm revenues, if the transaction price of the two contracts are set equal. Lastly, we present and analyze distributed control schemes for frequency regulation in a smart grid using energy storage, wind generators, demand response and conventional generators while having no communication or data sharing between them. We also propose a novel control scheme for frequency support by energy storage in which the power output of energy storage changes proportionally with the reduction in its available energy. The application of the proposed control schemes indicates an improvement in system frequency characteristics, when there is a sudden net loss of generation.

  12. Advanced, High Power, Next Scale, Wave Energy Conversion Device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mekhiche, Mike; Dufera, Hiz; Montagna, Deb

    2012-10-29

    The project conducted under DOE contract DE‐EE0002649 is defined as the Advanced, High Power, Next Scale, Wave Energy Converter. The overall project is split into a seven‐stage, gated development program. The work conducted under the DOE contract is OPT Stage Gate III work and a portion of Stage Gate IV work of the seven stage product development process. The project effort includes Full Concept Design & Prototype Assembly Testing building on our existing PowerBuoy technology to deliver a device with much increased power delivery. Scaling‐up from 150kW to 500kW power generating capacity required changes in the PowerBuoy design that addressedmore » cost reduction and mass manufacturing by implementing a Design for Manufacturing (DFM) approach. The design changes also focused on reducing PowerBuoy Installation, Operation and Maintenance (IO&M) costs which are essential to reducing the overall cost of energy. In this design, changes to the core PowerBuoy technology were implemented to increase capability and reduce both CAPEX and OPEX costs. OPT conceptually envisaged moving from a floating structure to a seabed structure. The design change from a floating structure to seabed structure would provide the implementation of stroke‐ unlimited Power Take‐Off (PTO) which has a potential to provide significant power delivery improvement and transform the wave energy industry if proven feasible.« less

  13. The strategic use of forward contracts: Applications in power markets

    NASA Astrophysics Data System (ADS)

    Lien, Jeffrey Scott

    This dissertation develops three theoretical models that analyze forward trading by firms with market power. The models are discussed in the context of recently restructured power markets, but the results can be applied more generally. The first model considers the profitability of large firms in markets with limited economies of scale and free entry. When large firms apply their market power, small firms benefit from the high prices without incurring the costs of restricted output. When entry is considered, and profit opportunity is determined by the cost of entry, this asymmetry creates the "curse of market power;" the long-run profits of large firms are reduced because of their market power. I suggest ways that large power producers can cope with the curse of market power, including the sale of long-term forward contracts. Past research has shown that forward contracts can demonstrate commitment to aggressive behavior to a competing duopolist. I add explicitly modeled entry to this literature, and make the potential entrants the audience of the forward sale. The existence of a forward market decreases equilibrium entry, increases the profits of large firms, and enhances economic efficiency. In the second model, a consumer representative, such as a state government or regulated distribution utility, bargains in the forward market on behalf of end-consumers who cannot organize together in the spot market. The ability to organize in forward markets allows consumers to encourage economic efficiency. When multiple producers are considered, I find that the ability to offer contracts also increases consumer surplus by decreasing the producers' profits. In some specifications of the model, consumers are able to capture the full gains from trade. The third model of this dissertation considers the ability of a large producer to take advantage of anonymity by randomly alternating between forward sales and forward purchases. The large producer uses its market power to always obtain favorable settlement on its forward transactions. Since other participants in the market cannot anticipate the large producer's eventual spot market behavior they cannot effectively arbitrage between markets. I find that forward transaction anonymity leads to spot price destabilization and cost inefficiency.

  14. Do elections matter for private-sector healthcare management in Brazil? An analysis of municipal health policy.

    PubMed

    McGregor, Alecia J; Siqueira, Carlos Eduardo; Zaslavsky, Alan M; Blendon, Robert J

    2017-07-12

    This study analyzed several political determinants of increased private-sector management in Brazilian health care. In Brazil, the poor depend almost exclusively on the public Unified Health System (the SUS), which remains severely underfunded. Given the overhead costs associated with privately contracted health services, increased private management is one driver of higher expenditures in the system. Although left parties campaign most vocally in support of greater public control of the SUS, the extent to which their stated positions translate into health care policy remains untested. Drawing on multiple publicly available data sources, we used linear regression to analyze how political party-in-power and existing private sector health care contracting affect the share of privately managed health care services and outsourcing in municipalities. Data from two election periods-2004 to 2008 and 2008 to 2012-were analyzed. Our findings showed that although private sector contracting varies greatly across municipalities, this variation is not systematically associated with political party in power. This suggests that electoral politics plays a relatively minor role in municipal-level health care administration. Existing levels of private sector management appear to have a greater effect on the public-private makeup of the Brazilian healthcare system, suggesting a strong role of path dependence in the evolution of Brazilian health care delivery. Despite campaign rhetoric asserting distinct positions on privatization in the SUS, factors other than political party in power have a greater effect on private-sector health system management at the municipal-level in Brazil. Given the limited effect of elections on this issue, strengthening participatory bodies such as municipal health councils may better enfranchise citizens in the fundamental debate over public and private roles in the health care sector.

  15. The fundholding fandango.

    PubMed Central

    Bowie, C; Harris, T

    1994-01-01

    General practitioner fundholding allows flexible use of resources at the coal-face, provides incentives to alter practice such as prescribing within cash limits and forces hospitals to be more responsive to general practitioner demands. However, the additional administrative costs both in time and money, the fragmentation of purchasing power compounded by a lack of expertise and experience in contracting, and the poor information and financial systems which exist in the National Health Service are severe constraints. A suggested way forward is to delegate responsibility for running the scheme, including the contracting and billing, to district health authorities offering more flexible budgets to all practices and extending the scheme as local information systems allow. This will reduce fragmentation of purchasing power and administrative costs and re-establish local accountability. It will also give the general practitioner more time to see and treat patients, who will see the system as being fairer. PMID:8312038

  16. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  17. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  18. 13 CFR 125.17 - Who decides if a contract opportunity for SDVO competition exists?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Who decides if a contract opportunity for SDVO competition exists? 125.17 Section 125.17 Business Credit and Assistance SMALL BUSINESS... opportunity for SDVO competition exists? The contracting officer for the contracting activity decides if a...

  19. Analysis of Air Force Secondary Power Logistics Solution Contract

    DTIC Science & Technology

    2010-05-21

    IL 62225 SUBJECT: Audit. Analysis of Air Force Secondary Power Logistics Solution Contract, 748th Supply Chain Management Group, Hill Air Fon:r... Power Logis.tics Solution Contnict. 748111 Supply Ch.,in Management Group. !-lill Air FOfC! BII.SI!, UT (Project 02009· DOOOCH·0213.000) I. AUlIctlcd...00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Analysis of Air Force Secondary Power Logistics Solution Contract 5a. CONTRACT NUMBER 5b. GRANT

  20. The National Carbon Capture Center at the Power Systems Development Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-12-30

    The National Carbon Capture Center (NCCC) at the Power Systems Development Facility supports the Department of Energy (DOE) goal of promoting the United States’ energy security through reliable, clean, and affordable energy produced from coal. Work at the NCCC supports the development of new power technologies and the continued operation of conventional power plants under CO 2 emission constraints. The NCCC includes adaptable slipstreams that allow technology development of CO 2 capture concepts using coal-derived syngas and flue gas in industrial settings. Because of the ability to operate under a wide range of flow rates and process conditions, research atmore » the NCCC can effectively evaluate technologies at various levels of maturity and accelerate their development path to commercialization. During its first contract period, from October 1, 2008, through December 30, 2014, the NCCC designed, constructed, and began operation of the Post-Combustion Carbon Capture Center (PC4). Testing of CO 2 capture technologies commenced in 2011, and through the end of the contract period, more than 25,000 hours of testing had been achieved, supporting a variety of technology developers. Technologies tested included advanced solvents, enzymes, membranes, sorbents, and associated systems. The NCCC continued operation of the existing gasification facilities, which have been in operation since 1996, to support the advancement of technologies for next-generation gasification processes and pre-combustion CO 2 capture. The gasification process operated for 13 test runs, supporting over 30,000 hours combined of both gasification and pre-combustion technology developer testing. Throughout the contract period, the NCCC incorporated numerous modifications to the facilities to accommodate technology developers and increase test capabilities. Preparations for further testing were ongoing to continue advancement of the most promising technologies for future power generation processes.« less

  1. 47 CFR 54.604 - Consortia, telecommunications services, and existing contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Consortia, telecommunications services, and existing contracts. 54.604 Section 54.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... Telecommunications Program § 54.604 Consortia, telecommunications services, and existing contracts. (a) Consortia. (1...

  2. 47 CFR 54.604 - Consortia, telecommunications services, and existing contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Consortia, telecommunications services, and existing contracts. 54.604 Section 54.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... Telecommunications Program § 54.604 Consortia, telecommunications services, and existing contracts. (a) Consortia. (1...

  3. 40 CFR 35.937-11 - Applicability to existing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Applicability to existing contracts. 35.937-11 Section 35.937-11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... § 35.937-11 Applicability to existing contracts. Some negotiated engineering subagreements already in...

  4. 48 CFR 227.7105 - Contracts for the acquisition of existing works.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COPYRIGHTS Rights in Technical Data 227.7105 Contracts for the acquisition of existing works. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for the acquisition of existing works. 227.7105 Section 227.7105 Federal Acquisition Regulations System DEFENSE...

  5. Large rotorcraft transmission technology development program

    NASA Technical Reports Server (NTRS)

    Mack, J. C.

    1983-01-01

    Testing of a U.S. Army XCH-62 HLH aft rotor transmission under NASA Contract NAS 3-22143 was successfully completed. This test establishes the feasibility of large, high power rotorcraft transmissions as well as demonstrating the resolution of deficiencies identified during the HLH advanced technology programs and reported by USAAMRDLTR-77-38. Over 100 hours of testing was conducted. At the 100% design power rating of 10,620 horsepower, the power transferred through a single spiral bevel gear mesh is more than twice that of current helicopter bevel gearing. In the original design of these gears, industry-wide design methods were employed and failures were experienced which identified problem areas unique to gear size. To remedy this technology shortfall, a program was developed to predict gear stresses using finite element analysis for complete and accurate representation of the gear tooth and supporting structure. To validate the finite element methodology gear strain data from the existing U.S. Army HLH aft transmission was acquired, and existing data from smaller gears were made available.

  6. Feasibility study of a high temperature radiation furnace for space applications

    NASA Technical Reports Server (NTRS)

    Eiss, A.; Dussan, B.; Shadis, W.; Frank, L.

    1973-01-01

    The feasibility was investigated of a high temperature general purpose furnace for use in space. It was determined that no commercial furnaces exist which could, even with extensive modifications, meet the goals of temperature, power, weight, volume, and versatility originally specified in the contract Statement of Work. A feasible furnace design which does substantially meet these goals while employing many of the advanced features of the commercial furnaces is developed and presented.

  7. Advanced Radioisotope Power Conversion Technology Research and Development

    NASA Technical Reports Server (NTRS)

    Wong, Wayne A.

    2004-01-01

    NASA's Radioisotope Power Conversion Technology program is developing next generation power conversion technologies that will enable future missions that have requirements that cannot be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power System (RPS) technology. Performance goals of advanced radioisotope power systems include improvement over the state-of-practice General Purpose Heat Source/Radioisotope Thermoelectric Generator by providing significantly higher efficiency to reduce the number of radioisotope fuel modules, and increase specific power (watts/kilogram). Other Advanced RPS goals include safety, long-life, reliability, scalability, multi-mission capability, resistance to radiation, and minimal interference with the scientific payload. NASA has awarded ten contracts in the technology areas of Brayton, Stirling, Thermoelectric, and Thermophotovoltaic power conversion including five development contracts that deal with more mature technologies and five research contracts. The Advanced RPS Systems Assessment Team includes members from NASA GRC, JPL, DOE and Orbital Sciences whose function is to review the technologies being developed under the ten Radioisotope Power Conversion Technology contracts and assess their relevance to NASA's future missions. Presented is an overview of the ten radioisotope power conversion technology contracts and NASA's Advanced RPS Systems Assessment Team.

  8. The influence of injection volume and capsular bag contraction on the refractive power of polymer refilled lenses - a finite element modelling simulation study.

    PubMed

    Martin, Heiner; Guthoff, Rudolf; Schmitz, Klaus-Peter

    2011-09-01

    Polymer injection into the capsular bag after phakoemulsification is an interesting and promising approach to lens surgery. Safe clinical application of this technique will require an appropriate estimate of the effect of implantation variables on the lens power. This article details the results of finite element investigations into the effects of the injected polymer volume and capsular bag contraction on the resultant lens power and accommodation amplitude. An axisymmetric finite element model was created from literature sources. Polymer injection and the capsular contraction were simulated, and their effect on the lens power was calculated. The simulations show that overfilling during polymer injection leads to a refractive power increase of the lens. Capsular bag contraction also results in a power increase. The calculated accommodative amplitude of the lens is minimally affected by capsular bag contraction but decreases significantly with increased capsular bag stiffness as a result of fibrosis. © 2010 The Authors. Journal compilation © 2010 Acta Ophthalmol.

  9. 48 CFR 9904.410-63 - Effective date.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: (a) Contract I—Since Contract I was in existence prior to January 1, 1978, the G&A expense pool shall... this contract was in existence prior to January 1, 1978, the G&A expense pool shall be allocated to it... Standard's applicability upon receipt of a contract to which this Standard is applicable. For contractors...

  10. 48 CFR 9904.410-63 - Effective date.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: (a) Contract I—Since Contract I was in existence prior to January 1, 1978, the G&A expense pool shall... this contract was in existence prior to January 1, 1978, the G&A expense pool shall be allocated to it... Standard's applicability upon receipt of a contract to which this Standard is applicable. For contractors...

  11. 48 CFR 9904.410-63 - Effective date.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: (a) Contract I—Since Contract I was in existence prior to January 1, 1978, the G&A expense pool shall... this contract was in existence prior to January 1, 1978, the G&A expense pool shall be allocated to it..., 1992. Contractors with prior CAS-covered contracts with full coverage shall continue this Standard's...

  12. 23 CFR 636.208 - May I use my existing prequalification procedures with design-build contracts?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false May I use my existing prequalification procedures with design-build contracts? 636.208 Section 636.208 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria § 636.208 May I use my existing...

  13. Power and Control: Contracts and the Patient-Physician Relationship

    PubMed Central

    Lieber, Sarah R.; Kim, Scotty Y.; Volk, Michael L.

    2011-01-01

    Contracts with patients have become increasingly common in clinical practice and the medical literature. These include behavioral contracts for managing “difficult patients” 1, opioid contracts2–5, suicide prevention contracts6,7, and healthy living contracts8. Some physician practices have even asked patients to sign contracts promising not to litigate or post defamatory comments on the Internet9. Despite widespread adoption, few have stopped to consider the potential risks and ethical concerns with using these documents. This perspective will describe how patient contracts are ultimately about power and control, and if not used carefully could damage the patient-physician relationship. PMID:22093528

  14. 13 CFR 126.609 - What must the contracting officer do if a contracting opportunity does not exist for competition...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What must the contracting officer do if a contracting opportunity does not exist for competition among qualified HUBZone SBCs? 126.609 Section 126.609 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual...

  15. 48 CFR 27.303 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sublicense foreign governments or international organizations pursuant to any existing or future treaty or... interest to sublicense foreign governments or international organizations pursuant to any existing or... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights under Government Contracts 27.303 Contract clauses. (a...

  16. 48 CFR 342.302 - Contract administration functions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Contract Administration Office Functions 342.302 Contract administration..., contractor employees are considered “visitors.” Further, for any proposed or existing construction contract...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharma, R K; Freeman, III, R F

    Region III of the US Fish and Wildlife Service contracted with the Division of Environmental Impact Studies, Argonne National Laboratory, to make the 316(b) determination for the Donald C. Cook Nuclear Power Plant of the Indiana and Michigan Power Company and to make recommendations for improvement in intake design to facilitate compliance. To conduct this assessment, appropriate literature on screening systems and reports furnished by the applicant on intake design and operation and on ecological studies at the site were reviewed. Modifications of the location and design of the existing intake and possibilities of retrofitting with fine-mesh screening to screenmore » larval forms of fishes were examined. It was determined that currently there is no dictated need for fine-mesh screening of intake flow at the D.C. Cook Nuclear Power Plant.« less

  18. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  19. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  20. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering services, and in 7 CFR part 1726 for construction and procurement. (b) Large retail power contracts. RUS approval of contracts to sell electric power to retail customers is required only if the... AGRICULTURE POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Operational...

  1. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... of a power of attorney identifying the agent authorized to sign the offer or contract on that member's behalf. The contracting officer shall attach a copy of each power of attorney to each signed copy...

  2. 18 CFR 420.42 - Contracts; minimum charge.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Contracts; minimum charge. 420.42 Section 420.42 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.42 Contracts; minimum...

  3. Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Oriti, Sal M.; Schifer, Nicholas A.

    2017-01-01

    Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

  4. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Power supply arrangements. (1) Power supply contracts (including but not limited to economy energy sales... agreements, pooling agreements, and any other similar power supply arrangements subject to approval by RUS are deemed approved if they have a term of 2 years or less. Amendments to said power supply...

  5. Green Power Partnership Long-term Contracts

    EPA Pesticide Factsheets

    The U.S. EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. This page lists Partners that signed a contract to purchase green power for 5 years or more.

  6. 23 CFR 636.208 - May I use my existing prequalification procedures with design-build contracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design-build contracts? 636.208 Section 636.208 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria... use your existing prequalification procedures for either construction or engineering design firms as a...

  7. 3D power Doppler ultrasound assessment of placental perfusion during uterine contraction in labor.

    PubMed

    Sato, Miki; Noguchi, Junko; Mashima, Masato; Tanaka, Hirokazu; Hata, Toshiyuki

    2016-09-01

    To assess placental perfusion during spontaneous or induced uterine contraction in labor at term using placental vascular sonobiopsy (PVS) by 3D power Doppler ultrasound with the VOCAL imaging analysis program. PVS was performed in 50 normal pregnancies (32 in spontaneous labor group [SLG], and 18 in induced labor group with oxytocin or prostaglandin F2α [ILG]) at 37-41 weeks of gestation to assess placental perfusion during uterine contraction in labor. Only pregnancies with an entirely visualized anterior placenta were included in the study. Data acquisition was performed before, during (at the peak of contraction), and after uterine contraction. 3D power Doppler indices such as the vascularization index (VI), flow index (FI), and vascularization flow index (VFI) were calculated in each placenta. There were no abnormal fetal heart rate tracings during contraction in either group. VI and VFI values were significantly reduced during uterine contraction in both groups (SLG, -33.4% [-97.0-15.2%], and ILG, -49.6% [-78.2--4.0%]), respectively (P < 0.001). The FI value in the ILG group was significantly lower during uterine contraction (P = 0.035), whereas it did not change during uterine contraction in the SLG group. After uterine contraction, all vascular indices returned almost to the same level as that before uterine contraction. However, the FI value in ILG (-8.6%, [-19.7-16.0%]) was significantly lower than that in SLG (2.4%, [-13.4-38.1%]) after uterine contraction (P < 0.05). All 3D power Doppler indices (VI, FI, and VFI) during uterine contraction (at the peak of contraction) showed a correlation greater than 0.7, with good intra- and inter-observer agreements. Our findings suggest that uterine contraction in both spontaneous and induced labors causes a significant reduction in placental perfusion. Reduced placental blood flow in induced uterine contraction has a tendency to be marked compared with that in spontaneous uterine contraction. To the best of our knowledge, this is the first study on the non-invasive assessment of placental perfusion during uterine contraction in labor using 3D power Doppler ultrasound. However, the data and their interpretation in the present study should be taken with some degree of caution because of the small number of subjects studied. Further studies involving a larger sample size are needed to assess placental perfusion and vascularity using PVS during normal and abnormal uterine contractions in normal and high-risk pregnancies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Muscle power output properties using the stretch-shortening cycle of the upper limb and their relationships with a one-repetition maximum bench press.

    PubMed

    Miyaguchi, Kazuyoshi; Demura, Shinichi

    2006-05-01

    The purpose of this study was to examine the output properties of muscle power by the dominant upper limb using SSC, and the relationships between the power output by SSC and a one-repetition maximum bench press (1 RM BP) used as a strength indicator of the upper body. Sixteen male athletes (21.4+/-0.9 yr) participated in this study. They pulled a load of 40% of maximum voluntary contraction (MVC) at a stretch by elbow flexion of the dominant upper limb in the following three preliminary conditions: static relaxed muscle state (SR condition), isometric muscle contraction state (ISO condition), and using SSC (SSC condition). The velocity with a wire load via a pulley during elbow flexion was measured accurately using a power instrument with a rotary encoder, and the muscle power curve was drawn from the product of the velocity and load. Significant differences were found among all evaluation parameters of muscle power exerted from the above three conditions and the parameters regarding early power output during concentric contraction were larger in the SSC condition than the SR and ISO conditions. The parameters on initial muscle contraction velocity when only using SSC significantly correlated with 1 RM BP (r=0.60-0.62). The use of SSC before powerful elbow flexion may contribute largely to early explosive power output during concentric contraction. Bench press capacity relates to a development of the above early power output when using SSC.

  9. Design issues concerning Iran`s Bushehr nuclear power plant VVER-1000 conversion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carson, C.F.

    On January 8, 1995, the Atomic Energy Organization of Iran (AEOI) signed a contract for $800 million with the Russian Federation Ministry for Atomic Energy (Minatom) to complete Bushehr nuclear power plant (BNPP) unit 1. The agreement called for a Russian VVER-1000/320 pressurized water reactor (PWR) to be successfully installed into the existing German-built BNPP facilities in 5 yr. System design differences, bomb damage, and environmental exposure are key issues with which Minatom must contend in order to fulfill the contract. The AEOI under the Shah of Iran envisioned Bushehr as the first of many nuclear power plants, with Iranmore » achieving 24 GW(electric) by 1993 and 34 GW(electric) by 2000. Kraftwerk Union AG (KWU) began construction of the two-unit plant near the Persian Gulf town of Halileh in 1975. Unit 1 was {approx}80% complete and unit 2 was {approx}50% complete when construction was interrupted by the 1979 Iranian Islamic revolution. Despite repeated AEOI attempts to lure KWU and other companies back to Iran to complete the plant, Western concerns about nuclear proliferation in Iran and repeated bombings of the plant during the 1980-1988 Iran-Iraq war dissuaded Germany from resuming construction.« less

  10. 47 CFR 54.604 - Existing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Health Care Providers § 54.604 Existing contracts. (a) Existing... health care provider as defined under § 54.601 and a telecommunications carrier shall be exempt from the...

  11. Implantable power generation system utilizing muscle contractions excited by electrical stimulation.

    PubMed

    Sahara, Genta; Hijikata, Wataru; Tomioka, Kota; Shinshi, Tadahiko

    2016-06-01

    An implantable power generation system driven by muscle contractions for supplying power to active implantable medical devices, such as pacemakers and neurostimulators, is proposed. In this system, a muscle is intentionally contracted by an electrical stimulation in accordance with the demands of the active implantable medical device for electrical power. The proposed system, which comprises a small electromagnetic induction generator, electrodes with an electrical circuit for stimulation and a transmission device to convert the linear motion of the muscle contractions into rotational motion for the magneto rotor, generates electrical energy. In an ex vivo demonstration using the gastrocnemius muscle of a toad, which was 28 mm in length and weighed 1.3 g, the electrical energy generated by the prototype exceeded the energy consumed for electrical stimulation, with the net power being 111 µW. It was demonstrated that the proposed implantable power generation system has the potential to replace implantable batteries for active implantable medical devices. © IMechE 2016.

  12. Contract-based electricity markets in developing countries: Overcoming inefficiency constraints

    NASA Astrophysics Data System (ADS)

    Perera, M. N. Susantha

    The electric utility sector throughout the world has been undergoing significant changes. It is changing from its traditional, central-station generation model managed under a vertically integrated monopoly to a more market-dependent business. In the rich industrialized countries, this change has progressed rapidly with the emergence of competitive markets---not only in the area of electricity generation, but also in the extension of such markets down to the level of retail domestic consumer. Developing countries, on the other hand, are trying to attract much-needed investment capital for their power sector expansion activities, particularly for the expansion of generating capacity, through the involvement of the private sector. Unlike their industrialized counterparts, they are facing many limitations in transforming the mostly government-owned monopolies into market-driven businesses, thereby creating an environment that is conducive to private sector participation. Amongst these limitations are the lack of a well-developed, local private sector or domestic financial market that can handle the sophisticated power sector financing; inadequate legal and regulatory frameworks that can address the many complexities of private power development; and numerous risk factors including political risks. This dissertation research addresses an important inefficiency faced by developing countries in the new contract-based market structure that has emerged within these countries. It examines the inefficiencies brought on by restrictions in the contracts, specifically those arising from the guaranteed purchase conditions that are typically included in contracts between the purchasing utility and independent power producers in this new market. The research attempts to provide a solution for this problem and proposes a methodology that enables the parties to conduct their businesses in a cost-efficient manner within a cooperative environment. The situation described above is modeled as a cooperative game based on the relationships that typically exist in power pools. This model draws its mathematical basis from game theory. This research demonstrates that the proposed model has a theoretical solution that yields an efficient allocation of resources. Furthermore, this solution has a significant practical validity as a tool that can be employed by developing country governments faced with similar market situations. In the case study presented here, the model is tested using data from a small developing country.

  13. Cream-Skimming, Parking and Other Intended and Unintended Effects of High-Powered, Performance-Based Contracts

    ERIC Educational Resources Information Center

    Koning, Pierre; Heinrich, Carolyn J.

    2013-01-01

    As performance-based contracting in social welfare services continues to expand, concerns about potential unintended effects are also growing. We analyze the incentive effects of high-powered, performance-based contracts and their implications for program outcomes using panel data on Dutch cohorts of unemployed and disabled workers that were…

  14. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  15. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  16. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  17. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  18. Size, History-Dependent, Activation and Three-Dimensional Effects on the Work and Power Produced During Cyclic Muscle Contractions.

    PubMed

    Ross, Stephanie A; Ryan, David S; Dominguez, Sebastian; Nigam, Nilima; Wakeling, James M

    2018-05-03

    Muscles undergo cycles of length change and force development during locomotion, and these contribute to their work and power production to drive body motion. Muscle fibres are typically considered to be linear actuators whose stress depends on their length, velocity, and activation state, and whose properties can be scaled up to explain the function of whole muscles. However, experimental and modelling studies have shown that a muscle's stress additionally depends on inactive and passive tissues within the muscle, the muscle's size, and its previous contraction history. These effects have not been tested under common sets of contraction conditions, especially the cyclic contractions that are typical of locomotion. Here we evaluate the relative effects of size, history-dependent, activation and three-dimensional effects on the work and power produced during cyclic contractions of muscle models. Simulations of muscle contraction were optimized to generate high power outputs: this resulted in the muscle models being largely active during shortening, and inactive during lengthening. As such, the history-dependent effects were dominated by force depression during simulated active shortening rather than force enhancement during active stretch. Internal work must be done to deform the muscle tissue, and to accelerate the internal muscle mass, resulting in reduced power and work that can be done on an external load. The effect of the muscle mass affects the scaling of muscle properties, with the inertial costs of contraction being relatively greater at larger sizes and lower activation levels.

  19. 36 CFR 51.23 - May the Director extend an existing concession contract without a public solicitation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false May the Director extend an... Concession Contracts § 51.23 May the Director extend an existing concession contract without a public solicitation? Notwithstanding the public solicitation requirements of this part, the Director may award non...

  20. 36 CFR 51.23 - May the Director extend an existing concession contract without a public solicitation?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false May the Director extend an existing concession contract without a public solicitation? 51.23 Section 51.23 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR CONCESSION CONTRACTS Non-Competitive Award of...

  1. 13 CFR 126.604 - Who decides if a contract opportunity for HUBZone set-aside competition exists?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Who decides if a contract opportunity for HUBZone set-aside competition exists? 126.604 Section 126.604 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual Assistance § 126.604 Who decides if a contract...

  2. 77 FR 66607 - Placer County Water Agency; Notice of Application for Approval of Contract for the Sale of Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... contract with Pacific Gas and Electric Company (PG&E) for two months beyond the expiration of the current... of two major storage reservoirs, five smaller reservoirs and diversion pools, and five powerhouses... Water Agency; Notice of Application for Approval of Contract for the Sale of Power for a Period...

  3. Theoretical foundations for finite-time transient stability and sensitivity analysis of power systems

    NASA Astrophysics Data System (ADS)

    Dasgupta, Sambarta

    Transient stability and sensitivity analysis of power systems are problems of enormous academic and practical interest. These classical problems have received renewed interest, because of the advancement in sensor technology in the form of phasor measurement units (PMUs). The advancement in sensor technology has provided unique opportunity for the development of real-time stability monitoring and sensitivity analysis tools. Transient stability problem in power system is inherently a problem of stability analysis of the non-equilibrium dynamics, because for a short time period following a fault or disturbance the system trajectory moves away from the equilibrium point. The real-time stability decision has to be made over this short time period. However, the existing stability definitions and hence analysis tools for transient stability are asymptotic in nature. In this thesis, we discover theoretical foundations for the short-term transient stability analysis of power systems, based on the theory of normally hyperbolic invariant manifolds and finite time Lyapunov exponents, adopted from geometric theory of dynamical systems. The theory of normally hyperbolic surfaces allows us to characterize the rate of expansion and contraction of co-dimension one material surfaces in the phase space. The expansion and contraction rates of these material surfaces can be computed in finite time. We prove that the expansion and contraction rates can be used as finite time transient stability certificates. Furthermore, material surfaces with maximum expansion and contraction rate are identified with the stability boundaries. These stability boundaries are used for computation of stability margin. We have used the theoretical framework for the development of model-based and model-free real-time stability monitoring methods. Both the model-based and model-free approaches rely on the availability of high resolution time series data from the PMUs for stability prediction. The problem of sensitivity analysis of power system, subjected to changes or uncertainty in load parameters and network topology, is also studied using the theory of normally hyperbolic manifolds. The sensitivity analysis is used for the identification and rank ordering of the critical interactions and parameters in the power network. The sensitivity analysis is carried out both in finite time and in asymptotic. One of the distinguishing features of the asymptotic sensitivity analysis is that the asymptotic dynamics of the system is assumed to be a periodic orbit. For asymptotic sensitivity analysis we employ combination of tools from ergodic theory and geometric theory of dynamical systems.

  4. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    DOE PAGES

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    2015-02-04

    We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less

  5. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    NASA Astrophysics Data System (ADS)

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    2015-02-01

    Over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. This study relies on a sample of 1113 contracts for residential PV systems installed in 2010-2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer’s discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. In addition, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.

  6. Exploring the market for third-party-owned residential photovoltaic systems: insights from lease and power-purchase agreement contract structures and costs in California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Carolyn; Steinberg, Daniel; Margolis, Robert

    We report that over the past several years, third-party-ownership (TPO) structures for residential photovoltaic (PV) systems have become the predominant ownership model in the US residential market. Under a TPO contract, the PV system host typically makes payments to the third-party owner of the system. Anecdotal evidence suggests that the total TPO contract payments made by the customer can differ significantly from payments in which the system host directly purchases the system. Furthermore, payments can vary depending on TPO contract structure. To date, a paucity of data on TPO contracts has precluded studies evaluating trends in TPO contract cost. Thismore » study relies on a sample of 1113 contracts for residential PV systems installed in 2010–2012 under the California Solar Initiative to evaluate how the timing of payments under a TPO contract impacts the ultimate cost of the system to the customer. Furthermore, we evaluate how the total cost of TPO systems to customers has changed through time, and the degree to which contract costs have tracked trends in the installed costs of a PV system. We find that the structure of the contract and the timing of the payments have financial implications for the customer: (1) power-purchase contracts, on average, cost more than leases, (2) no-money-down contracts are more costly than prepaid contracts, assuming a customer's discount rate is lower than 17% and (3) contracts that include escalator clauses cost more, for both power-purchase agreements and leases, at most plausible discount rates. Additionally, all contract costs exhibit a wide range, and do not parallel trends in installed costs over time.« less

  7. 48 CFR 27.405-4 - Other existing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is required to be included in contracts substantially for on-line data base services in the same form... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Other existing data. 27... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-4 Other existing...

  8. 48 CFR 27.405-4 - Other existing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... is required to be included in contracts substantially for on-line data base services in the same form... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Other existing data. 27... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-4 Other existing...

  9. 48 CFR 27.405-4 - Other existing data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... is required to be included in contracts substantially for on-line data base services in the same form... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Other existing data. 27... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-4 Other existing...

  10. 48 CFR 27.405-4 - Other existing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... is required to be included in contracts substantially for on-line data base services in the same form... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Other existing data. 27... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-4 Other existing...

  11. 48 CFR 27.405-4 - Other existing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... is required to be included in contracts substantially for on-line data base services in the same form... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Other existing data. 27... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-4 Other existing...

  12. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  13. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...] D7Contracts, policies, and marketing and allocation plans for electric power D8Import or export of natural gas... and Allocation Plans for Electric Power Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve (1) The interconnection of...

  14. 7 CFR 1717.306 - RUS required rates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-emption in Rate Making in Connection With Power Supply Borrowers § 1717.306 RUS required rates. (a) Upon... of RUS that are sufficient to satisfy the requirements of the RUS wholesale power contract and other... with terms of the RUS wholesale power contract and other RUS documents in a timely fashion, RUS may...

  15. 7 CFR 1717.306 - RUS required rates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-emption in Rate Making in Connection With Power Supply Borrowers § 1717.306 RUS required rates. (a) Upon... of RUS that are sufficient to satisfy the requirements of the RUS wholesale power contract and other... with terms of the RUS wholesale power contract and other RUS documents in a timely fashion, RUS may...

  16. Contracting out of clinical services in Zimbabwe.

    PubMed

    McPake, B; Hongoro, C

    1995-07-01

    Contracting is increasingly recommended to developing countries as a way of improving the efficiency of the health sector. However, empirical evidence regarding its effectiveness in this respect is almost completely absent. In Zimbabwe, a long standing contract exists between the Ministry of Health and Wankie Colliery to provide clinical services in the Colliery's 400 bed hospital. This paper details a study of the Zimbabweans' experience with the contract. Its success is assessed using comparisons with a neighbouring government hospital of the price of services (vs the cost in the government hospital); the situation of hospital workers; and the quality of services delivered. The Colliery has established a monopoly position for hospital services in the district. However, it appears to offer services of at least as good quality at prices which are lower than the unit costs of the government hospital when capital costs are included. Nevertheless, the contract cannot be considered a success due to the failure to contain its total cost. Approximately 70% of provincial non-salary recurrent expenditure is consumed by the contract while only a minority of the province's population have access to the Colliery hospital. Screening patients, both with respect to their ability to pay and to their need for secondary level services does not take place with the result that utilization levels are not controlled. The study highlights a number of important issues affecting contracting in developing country setting: First, contracted institutions attain powerful bargaining positions if there are no viable competitors and the government does not itself retain capacity to offer an alternative service. Second, specific skills are needed for the management of contracts at all levels. If the process of contract development responds to a crisis driven agenda resulting from civil service retrenchment and public expenditure cuts, it is unlikely that adequate consideration will be given to the development of such skills and the retention of key personnel. If such details are neglected, otherwise feasible efficiency gains will prove elusive.

  17. A Contract That Manages Itself: The Time Has Arrived

    DTIC Science & Technology

    2015-02-01

    technology inspires contracting. The Smart Contract The paradigm of a contract as a static document is about to change. The days of a contract being read...efficiency is of paramount importance in order for an organization to perform its mission. The Smart Contract as an Object In discussions about...the contract object ( smart contract ) exists, the contract will be able to interact with other objects. That will enable the contract to know how

  18. 75 FR 32455 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... Funding IV, L.L.C., Utility Contract Funding, L.L.C., Vineland Energy LLC, Central Power & Lime LLC, Cedar... Brakes I, L.L.C., Utility Contract Funding, L.L.C., Vineland Energy LLC, Central Power & Lime LLC, Cedar..., L.L.C., Vineland Energy LLC, Central Power & Lime LLC, Cedar Brakes II, L.L.C., J.P. Morgan...

  19. Childhood leukemia and cancers near German nuclear reactors: significance, context, and ramifications of recent studies.

    PubMed

    Nussbaum, Rudi H

    2009-01-01

    A government-sponsored study of childhood cancer in the proximity of German nuclear power plants (German acronym KiKK) found that children < 5 years living < 5 km from plant exhaust stacks had twice the risk for contracting leukemia as those residing > 5 km. The researchers concluded that since "this result was not to be expected under current radiation-epidemiological knowledge" and confounders could not be identified, the observed association of leukemia incidence with residential proximity to nuclear plants "remains unexplained." This unjustified conclusion illustrates the dissonance between evidence and assumptions. There exist serious flaws and gaps in the knowledge on which accepted models for population exposure and radiation risk are based. Studies with results contradictory to those of KiKK lack statistical power to invalidate its findings. The KiKK study's ramifications add to the urgency for a public policy debate regarding the health impact of nuclear power generation.

  20. Sex differences in neuromuscular function after repeated eccentric contractions of the knee extensor muscles.

    PubMed

    Lee, Andrea; Baxter, Jake; Eischer, Claire; Gage, Matt; Hunter, Sandra; Yoon, Tejin

    2017-06-01

    This study examined the mechanisms for force and power reduction during and up to 48 h after maximal eccentric contractions of the knee extensor muscles in young men and women. 13 men (22.8 ± 2.6 years) and 13 women (21.6 ± 2.2 years) performed 150 maximal effort eccentric contractions (5 sets of 30) with the knee extensor muscles at 60° s -1 . Maximal voluntary isometric contractions (MVIC) and maximal voluntary concentric contractions (MVCC) were performed before and after the 150 eccentric contractions. The MVCCs involved a set of two isokinetic contractions at 60° s -1 and sets of isotonic contractions performed at seven different resistance loads (1 N m, 10, 20, 30, 40, 50, and 60% MVIC). Electrical stimulation was used during the MVICs and at rest to determine changes in voluntary activation and contractile properties. At baseline, men were stronger than women (MVIC: 276 ± 48 vs. 133 ± 37 N m) and more powerful (MVCC: 649 ± 77 vs. 346 ± 78 W). At termination of the eccentric contractions, voluntary activation, resting twitch amplitude, and peak power during concentric contractions at the seven loads and at 60° s -1 decreased (P < 0.05) similarly in the men and women. At 48 h post-exercise, the MVIC torque, power (for loads ≥20-60% MVIC), and voluntary activation remained depressed (P < 0.05), but the resting twitch had returned to baseline (P > 0.05) with no sex differences. Central mechanisms were primarily responsible for the depressed maximal force production up to 48 h after repeated eccentric contractions of the knee extensors and these mechanisms were similar in men and women.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, P.

    For energy users, the driving force that makes renegotiating an electric contract realistic is the deregulation of the electric utility industry. Monumental changes are occurring that has the whole industry in chaos at the moment. Utilities are scrambling to retain or gain market share. New alternatives for power supplies will become available. Regulatory agencies are becoming more flexible. Many users are finding the utilities very willing to change from a rigid approach to a customer oriented attitude in anticipation of further changes in the deregulation process. Now is the time to renegotiate your electric contracts. The paper discusses the statusmore » of electric deregulation; new technology; utility company reactions; regulatory agency attitudes; independent power producers; power marketers and brokers; wheeling or transporting power; commoditization of electricity; power costs; stranded investment; and utilities` willingness to negotiate new contracts.« less

  2. Payment contracts in a preventive health care system: a perspective from operations management.

    PubMed

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  3. 48 CFR 204.7106 - Contract modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 204.7106 Contract modifications. (a) If new items are added, assign new contract line or subline item... those item numbers. (2) If the contracting officer decides to assign new identifications to existing contract or exhibit line items, the following rules apply— (i) Definitized and undefinitized items. (A) The...

  4. Stalk-length-dependence of the contractility of Vorticella convallaria

    NASA Astrophysics Data System (ADS)

    Gul Chung, Eun; Ryu, Sangjin

    2017-12-01

    Vorticella convallaria is a sessile protozoan of which the spasmoneme contracts on a millisecond timescale. Because this contraction is induced and powered by the binding of calcium ions (Ca2+), the spasmoneme showcases Ca2+-powered cellular motility. Because the isometric tension of V. convallaria increases linearly with its stalk length, it is hypothesized that the contractility of V. convallaria during unhindered contraction depends on the stalk length. In this study, the contractile force and energetics of V. convallaria cells of different stalk lengths were evaluated using a fluid dynamic drag model which accounts for the unsteadiness and finite Reynolds number of the water flow caused by contracting V. convallaria and the wall effect of the no-slip substrate. It was found that the contraction displacement, peak contraction speed, peak contractile force, total mechanical work, and peak power depended on the stalk length. The observed stalk-length-dependencies were simulated using a damped spring model, and the model estimated that the average spring constant of the contracting stalk was 1.34 nN µm-1. These observed length-dependencies of Vorticella’s key contractility parameters reflect the biophysical mechanism of the spasmonemal contraction, and thus they should be considered in developing a theoretical model of the Vorticella spasmoneme.

  5. Changes in power and force generation during coupled eccentric-concentric versus concentric muscle contraction with training and aging.

    PubMed

    Caserotti, Paolo; Aagaard, Per; Puggaard, Lis

    2008-05-01

    Age-related decline in maximal concentric muscle power is associated with frailty and functional impairments in the elderly. Compared to concentric contraction, mechanical muscle output is generally enhanced when muscles are rapidly pre-stretched (eccentric contraction), albeit less pronounced with increasing age. Exercise has been recommended to prevent loss of muscle power and function and recent guidelines indicate training program for increasing muscle power highly relevant for elderly subjects. This study examined the differences in muscle power, force and movement pattern during concentric-alone and coupled eccentric-concentric contraction and selected functional motor performances before and after 36-week multicomponent training including aerobic, strength, balance, flexibility and coordination components in elderly males. Vertical force, excursion, velocity, power and acceleration of the body center of mass were measured in two standardised vertical jumps (squatting jump, SQJ; countermovement jump, CMJ). Pre-stretch enhancement during CMJ did not improve performance [i.e., no enhanced maximal muscle power (Ppeak) and jump height (JH)] compared to concentric-alone muscle contraction (SQJ). Nevertheless, pre-stretch enhancement occurred as for similar SQJ and CMJ maximal performance, elderly people employed lower mechanical work, higher mean muscle power (Pmean), shorter concentric phase duration and shorter body center of mass displacement during CMJ. Post training, CMJ Ppeak, Pmean and JH increased in training group (P<0.05) while Ppeak and JH decreased in control group during the CMJ and SQJ (P<0.05). In conclusion, long-term training counteracted the age-related decline in muscle power and functional performance observed in the control subjects, while substantial gains in muscular performance were observed in the trained elderly.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liss, W.; Dybel, M.; West, R.

    This report covers the first year's work performed by the Gas Technology Institute and Encorp Inc. under subcontract to the National Renewable Energy Laboratory. The objective of this three-year contract is to develop innovative grid interconnection and control systems. This supports the advancement of distributed generation in the marketplace by making installations more cost-effective and compatible across the electric power and energy management systems. Specifically, the goals are: (1) To develop and demonstrate cost-effective distributed power grid interconnection products and software and communication solutions applicable to improving the economics of a broad range of distributed power systems, including existing, emerging,more » and other power generation technologies. (2) To enhance the features and capabilities of distributed power products to integrate, interact, and provide operational benefits to the electric power and advanced energy management systems. This includes features and capabilities for participating in resource planning, the provision of ancillary services, and energy management. Specific topics of this report include the development of an advanced controller, a power sensing board, expanded communication capabilities, a revenue-grade meter interface, and a case study of an interconnection distributed power system application that is a model for demonstrating the functionalities of the design of the advanced controller.« less

  7. NASA Research Announcement Phase 1 Report and Phase 2 Proposal for the Development of a Power Assisted Space Suit Glove Assembly

    NASA Technical Reports Server (NTRS)

    Cadogan, Dave; Lingo, Bob

    1996-01-01

    In July of 1996, ILC Dover was awarded Phase 1 of a contract for NASA to develop a prototype Power Assisted Space Suit glove to enhance the performance of astronauts during Extra-Vehicular Activity (EVA). This report summarizes the work performed to date on Phase 1, and details the work to be conducted on Phase 2 of the program. Phase 1 of the program consisted of research and review of related technical sources, concept brainstorming, baseline design development, modeling and analysis, component mock-up testing, and test data analysis. ILC worked in conjunction with the University of Maryland's Space Systems Laboratory (SSL) to develop the power assisted glove. Phase 2 activities will focus on the design maturation and the manufacture of a working prototype system. The prototype will be tested and evaluated in conjunction with existing space suit glove technology to determine the performance enhancement anticipated with the implementation of the power assisted joint technology in space suit gloves.

  8. Real option valuation of a decremental regulation service provided by electricity storage.

    PubMed

    Szabó, Dávid Zoltán; Martyr, Randall

    2017-08-13

    This paper is a quantitative study of a reserve contract for real-time balancing of a power system. Under this contract, the owner of a storage device, such as a battery, helps smooth fluctuations in electricity demand and supply by using the device to increase electricity consumption. The battery owner must be able to provide immediate physical cover, and should therefore have sufficient storage available in the battery before entering the contract. Accordingly, the following problem can be formulated for the battery owner: determine the optimal time to enter the contract and, if necessary, the optimal time to discharge electricity before entering the contract. This problem is formulated as one of optimal stopping, and is solved explicitly in terms of the model parameters and instantaneous values of the power system imbalance. The optimal operational strategies thus obtained ensure that the battery owner has positive expected economic profit from the contract. Furthermore, they provide explicit conditions under which the optimal discharge time is consistent with the overall objective of power system balancing. This paper also carries out a preliminary investigation of the 'lifetime value' aggregated from an infinite sequence of these balancing reserve contracts. This lifetime value, which can be viewed as a single project valuation of the battery, is shown to be positive and bounded. Therefore, in the long run such reserve contracts can be beneficial to commercial operators of electricity storage, while reducing some of the financial and operational risks in power system balancing.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  9. Capacity of Rectified Vestibular Evoked Myogenic Potential in Correcting Asymmetric Muscle Contraction Power

    PubMed Central

    Kim, Kun Woo; Jung, Jae Yun; Lee, Jeong Hyun

    2013-01-01

    Objectives Rectified vestibular evoked myogenic potential (rVEMP) is new method that simultaneously measures the muscle contraction power during VEMP recordings. Although there are a few studies that have evaluated the effect of the rVEMP, there is no study that has evaluated the capacity of rVEMP during asymmetrical muscle contraction. Methods Thirty VEMP measurements were performed among 20 normal subjects (mean age, 28.2±2.1 years; male, 16). VEMP was measured in the supine position. The head was turned to the right side by 0°, 15°, 30°, and 45° and the VEMPs were recorded in each position. The interaural amplitude difference (IAD) ratio was calculated by the conventional non-rectified VEMP (nVEMP) and rVEMP. Results The nVEMP IAD increased significantly according to increasing neck rotation. The IAD in rVEMP was almost similar from 0° to 30°. However, the IAD was significantly larger than the other positions when the neck was rotated 45°. When IAD during 0° was set as a standard, the IAD of the rVEMP was significantly smaller that the nVEMP only during the 30°rotaion. Conclusion Rectified VEMP is capable of correcting asymmetrical muscle contraction power. In contrast, it cannot correct the asymmetry if muscle contraction power asymmetry is 44.8% or larger. Also, it is not necessary if muscle contraction power asymmetry is 22.5% or smaller. PMID:24353859

  10. 41 CFR 51-9.503 - Effective date of new systems of records or alteration of an existing system of records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Effective date of new systems of records or alteration of an existing system of records. 51-9.503 Section 51-9.503 Public Contracts and Property Management Other Provisions Relating to Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 9...

  11. 18 CFR 1308.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Definitions. 1308.2 Section 1308.2 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT DISPUTES... knowledge and belief, and that the amount requested accurately reflects the contract adjustment for which...

  12. 7 CFR 1755.29 - Promulgation of new or revised contract forms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... amendment may change the existing identification of a listed contract form by, for example, changing the... 7 Agriculture 11 2011-01-01 2011-01-01 false Promulgation of new or revised contract forms. 1755... MATERIALS, AND STANDARD CONTRACT FORMS § 1755.29 Promulgation of new or revised contract forms. RUS may...

  13. 7 CFR 1724.73 - Promulgation of new or revised contract forms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The amendment may change the existing identification of a listed contract form; for example, changing... 7 Agriculture 11 2011-01-01 2011-01-01 false Promulgation of new or revised contract forms. 1724... POLICIES AND PROCEDURES RUS Contract Forms § 1724.73 Promulgation of new or revised contract forms. RUS may...

  14. Static Verification for Code Contracts

    NASA Astrophysics Data System (ADS)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  15. 41 CFR 300-2.1 - What formats exist in the FTR?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What formats exist in the FTR? 300-2.1 Section 300-2.1 Public Contracts and Property Management Federal Travel Regulation System GENERAL INTRODUCTION 2-HOW TO USE THE FTR General § 300-2.1 What formats exist in the FTR? The FTR...

  16. NASA Radioisotope Power Conversion Technology NRA Overview

    NASA Technical Reports Server (NTRS)

    Anderson, David J.

    2005-01-01

    The focus of the National Aeronautics and Space Administration's (NASA) Radioisotope Power Systems (RPS) Development program is aimed at developing nuclear power and technologies that would improve the effectiveness of space science missions. The Radioisotope Power Conversion Technology (RPCT) NASA Research Announcement (NRA) is an important mechanism through which research and technology activities are supported in the Advanced Power Conversion Research and Technology project of the Advanced Radioisotope Power Systems Development program. The purpose of the RPCT NRA is to advance the development of radioisotope power conversion technologies to provide higher efficiencies and specific powers than existing systems. These advances would enable a factor of two to four decrease in the amount of fuel and a reduction of waste heat required to generate electrical power, and thus could result in more cost effective science missions for NASA. The RPCT NRA selected advanced RPS power conversion technology research and development proposals in the following three areas: innovative RPS power conversion research, RPS power conversion technology development in a nominal 100 W(sub e) scale; and, milliwatt/multi-watt RPS (mWRPS) power conversion research. Ten RPCT NRA contracts were awarded in 2003 in the areas of Brayton, Stirling, thermoelectric (TE), and thermophotovoltaic (TPV) power conversion technologies. This paper will provide an overview of the RPCT NRA, a summary of the power conversion technologies approaches being pursued, and a brief digest of first year accomplishments.

  17. NASA Radioisotope Power Conversion Technology NRA Overview

    NASA Technical Reports Server (NTRS)

    Anderson, David J.

    2005-01-01

    The focus of the National Aeronautics and Space Administration s (NASA) Radioisotope Power Systems (RPS) Development program is aimed at developing nuclear power and technologies that would improve the effectiveness of space science missions. The Radioisotope Power Conversion Technology (RPCT) NASA Research Announcement (NRA) is an important mechanism through which research and technology activities are supported in the Advanced Power Conversion Research and Technology project of the Advanced Radioisotope Power Systems Development program. The purpose of the RPCT NRA is to advance the development of radioisotope power conversion technologies to provide higher efficiencies and specific powers than existing systems. These advances would enable a factor of 2 to 4 decrease in the amount of fuel and a reduction of waste heat required to generate electrical power, and thus could result in more cost effective science missions for NASA. The RPCT NRA selected advanced RPS power conversion technology research and development proposals in the following three areas: innovative RPS power conversion research, RPS power conversion technology development in a nominal 100We scale; and, milliwatt/multi-watt RPS (mWRPS) power conversion research. Ten RPCT NRA contracts were awarded in 2003 in the areas of Brayton, Stirling, thermoelectric (TE), and thermophotovoltaic (TPV) power conversion technologies. This paper will provide an overview of the RPCT NRA, a summary of the power conversion technologies approaches being pursued, and a brief digest of first year accomplishments.

  18. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  19. Building America Energy Renovations. A Business Case for Home Performance Contracting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baechler, Michael C.; Antonopoulos, C. A.; Sevigny, M.

    2012-10-01

    This research report gives an overview of the needs and opportunities that exist in the U.S. home performance contracting industry. The report discusses industry trends, market drivers, different business models, and points of entry for existing and new businesses hoping to enter the home performance contracting industry. Case studies of eight companies who successfully entered the industry are provided, including business metrics, start-up costs, and marketing approaches.

  20. Potentiation and recovery following low- and high-speed isokinetic contractions in boys.

    PubMed

    Chaouachi, Anis; Haddad, Monoem; Castagna, Carlo; Wong, Del P; Kaouech, Fathi; Chamari, Karim; Behm, David G

    2011-02-01

    The objective of this study was to examine the response and recovery to a single set of maximal, low and high angular velocity isokinetic leg extension-flexion contractions with boys. Sixteen boys (11-14 yrs) performed 10 isokinetic contractions at 60°.s-1 (Isok60) and 300°.s-1 (Isok300). Three contractions at both velocities, blood lactate and ratings of perceived exertion were monitored pretest and at 2, 3, 4, and 5 min of recovery (RI). Participants were tested in a random counterbalanced order for each velocity and recovery period. Only a single contraction velocity (300°.s-1 or 60°.s-1) was tested during recovery at each session to remove confounding influences between the recovery intervals. Recovery results showed no change in quadriceps' power at 300°.s-1, quadriceps' power, work and torque at 60°.s-1 and hamstrings' power and work with 60°.s-1. There was an increase during the 2 min RI in hamstrings' power, work and torque and quadriceps' torque with isokinetic contractions at 300°.s-1 suggesting a potentiating effect. Performance impairments during recovery occurred for the hamstrings torque at 60°.s-1 and quadriceps work with 300°.s-1. In conclusion, 10 repetitions of either low or high velocity isokinetic contractions (Isok60 or Isok300) resulted in full recovery or potentiation of most measures within 2 min in boys. The potentiation effect predominantly occurred following the hamstrings Isok300 which might be attributed to a greater agonist-antagonist torque balance and less metabolic stress associated with the shorter duration higher velocity contractions.

  1. Effects of hand configuration on muscle force coordination, co-contraction and concomitant intermuscular coupling during maximal isometric flexion of the fingers.

    PubMed

    Charissou, Camille; Amarantini, David; Baurès, Robin; Berton, Eric; Vigouroux, Laurent

    2017-11-01

    The mechanisms governing the control of musculoskeletal redundancy remain to be fully understood. The hand is highly redundant, and shows different functional role of extensors according to its configuration for a same functional task of finger flexion. Through intermuscular coherence analysis combined with hand musculoskeletal modelling during maximal isometric hand contractions, our aim was to better understand the neural mechanisms underlying the control of muscle force coordination and agonist-antagonist co-contraction. Thirteen participants performed maximal isometric flexions of the fingers in two configurations: power grip (Power) and finger-pressing on a surface (Press). Hand kinematics and force/moment measurements were used as inputs in a musculoskeletal model of the hand to determine muscular tensions and co-contraction. EMG-EMG coherence analysis was performed between wrist and finger flexors and extensor muscle pairs in alpha, beta and gamma frequency bands. Concomitantly with tailored muscle force coordination and increased co-contraction between Press and Power (mean difference: 48.08%; p < 0.05), our results showed muscle-pair-specific modulation of intermuscular coupling, characterized by pair-specific modulation of EMG-EMG coherence between Power and Press (p < 0.05), and a negative linear association between co-contraction and intermuscular coupling for the ECR/FCR agonist-antagonist muscle pair (r = - 0.65; p < 0.05). This study brings new evidence that pair-specific modulation of EMG-EMG coherence is related to modulation of muscle force coordination during hand contractions. Our results highlight the functional importance of intermuscular coupling as a mechanism contributing to the control of muscle force synergies and agonist-antagonist co-contraction.

  2. The Effects of Eccentric Contraction Duration on Muscle Strength, Power Production, Vertical Jump, and Soreness.

    PubMed

    Mike, Jonathan N; Cole, Nathan; Herrera, Chris; VanDusseldorp, Trisha; Kravitz, Len; Kerksick, Chad M

    2017-03-01

    Mike, JN, Cole, N, Herrera, C, VanDusseldorp, T, Kravitz, L, and Kerksick, CM. The effects of eccentric contraction duration on muscle strength, power production, vertical jump, and soreness. J Strength Cond Res 31(3): 773-786, 2017-Previous research has investigated the effects of either eccentric-only training or comparing eccentric and concentric exercise on changes related to strength and power expression, but no research to date has investigated the impact of altering the duration of either the concentric or the eccentric component on these parameters. Therefore, the purpose of this study was to assess the duration of eccentric (i.e., 2-second, 4-second vs. 6-second) muscle contractions and their effect on muscle strength, power production, vertical jump, and soreness using a plate-loaded barbell Smith squat exercise. Thirty college-aged men (23 ± 3.5 years, 178 ± 6.8 cm, 82 ± 12 kg, and 11.6 ± 5.1% fat) with 3.0 ± 1.0 years of resistance training experience and training frequency of 4.3 ± 0.9 days per week were randomized and assigned to 1 of 3 eccentric training groups that incorporated different patterns of contraction. For every repetition, all 3 groups used 2-second concentric contractions and paused for 1 second between the concentric and eccentric phases. The control group (2S) used 2-second eccentric contractions, whereas the 4S group performed 4-second eccentric contractions and the 6S group performed 6-second eccentric contractions. All repetitions were completed using the barbell Smith squat exercise. All participants completed a 4-week training protocol that required them to complete 2 workouts per week using their prescribed contraction routine for 4 sets of 6 repetitions at an intensity of 80-85% one repetition maximum (1RM). For all performance data, significant group × time (G × T) interaction effects were found for average power production across all 3 sets of a squat jump protocol (p = 0.04) while vertical jump did not reach significance but there was a trend toward a difference (G × T, p = 0.07). No other significant (p > 0.05) G × T interaction effects were found for the performance variables. All groups showed significant main effects for time in 1RM (p < 0.001), vertical jump (p = 0.004), peak power (p < 0.001), and average power (p < 0.001). Peak velocity data indicated that the 6S group experienced a significant reduction in peak velocity during the squat jump protocol as a result of the 4-week training program (p = 0.03). Soreness data revealed significant increases across time in all groups at both week 0 and week 4. Paired sample t-tests revealed greater differences in soreness values across time in the 2S group. The results provide further evidence that resistance training with eccentrically dominated movement patterns can be an effective method to acutely increase maximal strength and power expression in trained college age men. Furthermore, longer eccentric contractions may negatively impact explosive movements such as the vertical jump, whereas shorter eccentric contractions may instigate greater amounts of soreness. These are important considerations for the strength and conditioning professional to more fully understand that expressions of strength and power through eccentric training and varying durations of eccentric activity can have a significant impact for populations ranging from athletes desiring peak performance.

  3. Investigation of Ion Beam Production and Acceleration Using Linear Electron Beams and a Pulse Powered Plasma Focus.

    DTIC Science & Technology

    1984-03-01

    POWERED PLASMA FOCUS Contract No. AFOSR-83-0145 PROGRESS REPORT For the Period April 1, 1983 through March 31, 1984 Submitted to Air Force Office of...AND ACCELERATION USING LINEAR ELECTRON BEAMS AND A PULSE POWERED PLASMA FOCUS Contract No. AFOSR-83-0145 PROGRESS REPORT For the Period April 1, 1983...Acceleration Using Linear Electron Beams and a Pulse Powered Plasma Focus " 01 €,G APRIL 1, 1983 THROUGH MRCH 31, 1984 A. Collective Acceleration and Related

  4. 18 CFR 367.24 - Construction and service contracts for other companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... service company undertakes projects to construct physical property for associate or non-associate... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED... POWER ACT AND NATURAL GAS ACT General Instructions § 367.24 Construction and service contracts for other...

  5. 18 CFR 1316.10 - Officials not to benefit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Officials not to benefit. 1316.10 Section 1316.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... breach of this contract, and TVA shall have the right to exercise all remedies provided in this contract...

  6. 18 CFR 1316.10 - Officials not to benefit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Officials not to benefit. 1316.10 Section 1316.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... breach of this contract, and TVA shall have the right to exercise all remedies provided in this contract...

  7. 18 CFR 1316.10 - Officials not to benefit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Officials not to benefit. 1316.10 Section 1316.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... breach of this contract, and TVA shall have the right to exercise all remedies provided in this contract...

  8. The Value of Competitive Contracting

    DTIC Science & Technology

    2014-09-01

    Research & Engineering) BBP Better Buying Power BOA basic ordering agreement BPA basic purchase agreement CAE Component Acquisition Executive CDSA...competitive procedures for the following contract actions:” a. Contract and purchase orders b. Orders and calls under part 13 Basic Purchase Agreement ( BPA ...Basic Ordering Agreement (BOA) c. Government wide acquisition contracts and IDIQ contracts d. BPAs and BPA calls under Federal Supply Schedules

  9. Analysis on Causes of Employees' Damaged Rights in Perspective of Property Rights

    NASA Astrophysics Data System (ADS)

    Zheng, Xiuzhi; Lin, Lijie

    An employment contract is a contract of human capital property rights transaction between employees and employer. Due to its incompleteness, the employees' rights can not be fully defined in the employment contract. Therefore, some rights of employees lie in "Public Domain". Due to the rule of "Power Defining Property" in the prosperity dealing, employers with great power are able to grab at employees' rights in "Public Domain". In this paper, the theoretical foundation on the source of violations to employees' rights, the value of labor contract law and the role of labor union playing in the labor relationship are presented in perspective of property rights.

  10. 48 CFR 5.601 - Governmentwide database of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Governmentwide database of... database of contracts. (a) A Governmentwide database of contracts and other procurement instruments.../contractdirectory/.This searchable database is a tool that may be used to identify existing contracts and other...

  11. 48 CFR 5.601 - Governmentwide database of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Governmentwide database of... database of contracts. (a) A Governmentwide database of contracts and other procurement instruments.../contractdirectory/. This searchable database is a tool that may be used to identify existing contracts and other...

  12. 48 CFR 5.601 - Governmentwide database of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Governmentwide database of... database of contracts. (a) A Governmentwide database of contracts and other procurement instruments.../contractdirectory/ .This searchable database is a tool that may be used to identify existing contracts and other...

  13. 48 CFR 5.601 - Governmentwide database of contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Governmentwide database of... database of contracts. (a) A Governmentwide database of contracts and other procurement instruments.../contractdirectory/.This searchable database is a tool that may be used to identify existing contracts and other...

  14. Models of supply function equilibrium with applications to the electricity industry

    NASA Astrophysics Data System (ADS)

    Aromi, J. Daniel

    Electricity market design requires tools that result in a better understanding of incentives of generators and consumers. Chapter 1 and 2 provide tools and applications of these tools to analyze incentive problems in electricity markets. In chapter 1, models of supply function equilibrium (SFE) with asymmetric bidders are studied. I prove the existence and uniqueness of equilibrium in an asymmetric SFE model. In addition, I propose a simple algorithm to calculate numerically the unique equilibrium. As an application, a model of investment decisions is considered that uses the asymmetric SFE as an input. In this model, firms can invest in different technologies, each characterized by distinct variable and fixed costs. In chapter 2, option contracts are introduced to a supply function equilibrium (SFE) model. The uniqueness of the equilibrium in the spot market is established. Comparative statics results on the effect of option contracts on the equilibrium price are presented. A multi-stage game where option contracts are traded before the spot market stage is considered. When contracts are optimally procured by a central authority, the selected profile of option contracts is such that the spot market price equals marginal cost for any load level resulting in a significant reduction in cost. If load serving entities (LSEs) are price takers, in equilibrium, there is no trade of option contracts. Even when LSEs have market power, the central authority's solution cannot be implemented in equilibrium. In chapter 3, we consider a game in which a buyer must repeatedly procure an input from a set of firms. In our model, the buyer is able to sign long term contracts that establish the likelihood with which the next period contract is awarded to an entrant or the incumbent. We find that the buyer finds it optimal to favor the incumbent, this generates more intense competition between suppliers. In a two period model we are able to completely characterize the optimal mechanism.

  15. 41 CFR 51-10.150 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Program accessibility: Existing facilities. 51-10.150 Section 51-10.150 Public Contracts and Property Management Other Provisions... result in a fundamental alteration in the nature of a program or activity or in undue financial and...

  16. The Influence of Informal Power Structures on School Board-Teacher Union Contract Negotiations.

    ERIC Educational Resources Information Center

    Miller-Whitehead, Marie

    A study examined behaviors of participants trained in a nonadversarial model of contract negotiation, focusing on possible influences of formal and informal power structures, written and unwritten rules, and firmly entrenched adversarial behavior on the bargaining process. Participants were representatives of a district's teacher union and board…

  17. 10 CFR Appendix D to Subpart D of... - Classes of Actions that Normally Require EISs

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... [Reserved] D7 Contracts, policies, and marketing and allocation plans for electric power D8 Import or export... operational change D10 Treatment, storage, and disposal facilities for high-level waste and spent nuclear fuel... Contracts, Policies, and Marketing and Allocation Plans for Electric Power Establishment and implementation...

  18. 18 CFR 1316.10 - Officials not to benefit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Officials not to benefit. 1316.10 Section 1316.10 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY GENERAL... contract, and TVA shall have the right to exercise all remedies provided in this contract or at law. (End...

  19. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One...

  20. Physics History Books in the Fermilab Library

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sara Tompson.

    Fermilab is a basic research high-energy physics laboratory operated by Universities Research Association, Inc. under contract to the U.S. Department of Energy. Fermilab researchers utilize the Tevatron particle accelerator (currently the worlds most powerful accelerator) to better understand subatomic particles as they exist now and as they existed near the birth of the universe. A collection review of the Fermilab Library monographs was conducted during the summers of 1998 and 1999. While some items were identified for deselection, the review proved most fruitful in highlighting some of the strengths of the Fermilab monograph collection. One of these strengths is historymore » of physics, including biographies and astrophysics. A bibliography of the physics history books in the collection as of Summer, 1999 follows, arranged by author. Note that the call numbers are Library of Congress classification.« less

  1. Physics History Books in the Fermilab Library

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sara Tompson

    Fermilab is a basic research high-energy physics laboratory operated by Universities Research Association, Inc. under contract to the U.S. Department of Energy. Fermilab researchers utilize the Tevatron particle accelerator (currently the world�s most powerful accelerator) to better understand subatomic particles as they exist now and as they existed near the birth of the universe. A collection review of the Fermilab Library monographs was conducted during the summers of 1998 and 1999. While some items were identified for deselection, the review proved most fruitful in highlighting some of the strengths of the Fermilab monograph collection. One of these strengths is historymore » of physics, including biographies and astrophysics. A bibliography of the physics history books in the collection as of Summer, 1999 follows, arranged by author. Note that the call numbers are Library of Congress classification.« less

  2. 7 CFR 1410.51 - Transfer of land.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of, the land subject to a CRP contract, as determined by the Deputy Administrator, such new owner or operator, upon the approval of CCC, may become a participant to a new CRP contract with CCC for the... existing CRP contract, the new owner or operator shall assume all obligations of the CRP contract of the...

  3. 7 CFR 1726.303 - Promulgation of new or revised contract forms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... change the existing identification of a listed contract form; for example, changing the issuance date of... 7 Agriculture 11 2011-01-01 2011-01-01 false Promulgation of new or revised contract forms. 1726... Standard Forms § 1726.303 Promulgation of new or revised contract forms. RUS may, from time to time...

  4. 17 CFR 232.313 - Identification of investment company type and series and/or class (or contract).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... company type and series and/or class (or contract). 232.313 Section 232.313 Commodity and Securities... series and/or class (or contract). (a) Registered investment companies and business development companies... keep current, information concerning their existing and new series and/or classes (or contracts, in the...

  5. 17 CFR 232.313 - Identification of investment company type and series and/or class (or contract).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... company type and series and/or class (or contract). 232.313 Section 232.313 Commodity and Securities... series and/or class (or contract). (a) Registered investment companies and business development companies... keep current, information concerning their existing and new series and/or classes (or contracts, in the...

  6. Minnesota wood energy scale-up project 1994 establishment cost data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Downing, M.; Pierce, R.; Kroll, T.

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. Thesemore » extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.« less

  7. 77 FR 18127 - Enforcement of Subsidiary and Affiliate Contracts by the FDIC as Receiver of a Covered Financial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ...''), to enforce contracts of subsidiaries or affiliates of the covered financial company despite contract... provides for the appointment of the FDIC as receiver of a covered financial company that poses a systemic... institution) shall have the power to enforce contracts of subsidiaries or affiliates of a covered financial...

  8. Older men are more fatigable than young when matched for maximal power and knee extension angular velocity is unconstrained.

    PubMed

    Dalton, Brian H; Power, Geoffrey A; Paturel, Justin R; Rice, Charles L

    2015-06-01

    The underlying factors related to the divergent findings of age-related fatigue for dynamic tasks are not well understood. The purpose here was to investigate age-related fatigability and recovery between a repeated constrained (isokinetic) and an unconstrained velocity (isotonic) task, in which participants performed fatiguing contractions at the velocity (isokinetic) or resistance (isotonic) corresponding with maximal power. To compare between tasks, isotonic torque-power relationships were constructed prior to and following both fatiguing tasks and during short-term recovery. Contractile properties were recorded from 9 old (~75 years) and 11 young (~25 years) men during three testing sessions. In the first session, maximal power was assessed, and sessions 2 and 3 involved an isokinetic or an isotonic concentric fatigue task performed until maximal power was reduced by 40 %. Compared with young, the older men performed the same number of contractions to task failure for the isokinetic task (~45 contractions), but 20 % fewer for the isotonic task (p < 0.05). Regardless of age and task, maximal voluntary isometric contraction strength, angular velocity, and power were reduced by ~30, ~13, and ~25 %, respectively, immediately following task failure, and only isometric torque was not recovered fully by 10 min. In conclusion, older men are more fatigable than the young when performing a repetitive maximal dynamic task at a relative resistance (isotonic) but not an absolute velocity (isokinetic), corresponding to maximal power.

  9. 31 CFR 585.201 - Prohibited transactions involving blocked property; transactions with respect to securities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existence of any rights or obligations conferred or imposed by any international agreement or any contract... rights or obligations conferred or imposed by any international agreementor any contract entered into or... authorized, and notwithstanding the existence of any rights or obligations conferred or imposed by any...

  10. Revisiting the Long-Term Hedge Value of Wind Power in an Era of Low Natural Gas Prices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolinger, Mark

    Expanding production of the United States’ vast shale gas reserves in recent years has put the country on a path towards greater energy independence, enhanced economic prosperity, and (potentially) reduced emissions of greenhouse gases and other pollutants. The corresponding expansion of gas-fired generation in the power sector – driven primarily by lower natural gas prices – has also made it easier and cheaper to integrate large amounts of variable renewable generation, such as wind power, into the grid. At the same time, however, low natural gas prices have suppressed wholesale power prices across the nation, making it harder for windmore » and other renewable power technologies to compete on cost alone – even despite their recent cost and performance improvements. A near-term softening in policy-driven demand from state-level renewable energy mandates, coupled with a possible phase-out of a key federal tax incentive over time, may exacerbate wind’s challenge in the coming years. As wind power finds it more difficult to compete with gas-fired generation on the basis of near-term cost, it will increasingly need to rely on other attributes, such as its “portfolio” or “hedge” value, as justification for inclusion in the power mix. This article investigates the degree to which wind power can still serve as a cost-effective hedge against rising natural gas prices, given the significant reduction in gas prices in recent years, coupled with expectations that prices will remain low for many years to come. It does so by drawing upon a rich sample of long-term power purchase agreements (“PPAs”) between existing wind generators and electric utilities in the U.S., and comparing the contracted prices at which utilities will be buying wind power from these existing projects for decades to come to a variety of long-term projections of the fuel costs of gas-fired generation modeled by the Energy Information Administration (“EIA”).« less

  11. 47 CFR 43.51 - Contracts and concessions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... market power on the foreign end of one or more of the U.S.-international routes included in the contract... International Bureau's World Wide Web site at http://www.fcc.gov/ib. The Commission will include on the list of... markets on the foreign end of the route or that it nevertheless lacks sufficient market power on the...

  12. 47 CFR 43.51 - Contracts and concessions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... market power on the foreign end of one or more of the U.S.-international routes included in the contract... International Bureau's World Wide Web site at http://www.fcc.gov/ib. The Commission will include on the list of... markets on the foreign end of the route or that it nevertheless lacks sufficient market power on the...

  13. 47 CFR 43.51 - Contracts and concessions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... market power on the foreign end of one or more of the U.S.-international routes included in the contract... International Bureau's World Wide Web site at http://www.fcc.gov/ib. The Commission will include on the list of... markets on the foreign end of the route or that it nevertheless lacks sufficient market power on the...

  14. 18 CFR 2.103 - Statement of policy respecting take or pay provisions in gas purchase contracts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Statement of policy respecting take or pay provisions in gas purchase contracts. 2.103 Section 2.103 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...

  15. 18 CFR 2.103 - Statement of policy respecting take or pay provisions in gas purchase contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Statement of policy respecting take or pay provisions in gas purchase contracts. 2.103 Section 2.103 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...

  16. 18 CFR 2.103 - Statement of policy respecting take or pay provisions in gas purchase contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Statement of policy respecting take or pay provisions in gas purchase contracts. 2.103 Section 2.103 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...

  17. 18 CFR 2.103 - Statement of policy respecting take or pay provisions in gas purchase contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Statement of policy respecting take or pay provisions in gas purchase contracts. 2.103 Section 2.103 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...

  18. Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501

    DTIC Science & Technology

    1981-09-04

    begin necessary negotiations for initial long-term contracts. Third, the term "offer" is not defined in the Act. Under general contract law , a valid...The position that the Administrator must offer coplete and definite contracts within 9 months of December 5, 1980, is supported by general contract law definitions...conititute "offers" in contract law . This interpretation is supported by Williston, who states that an offer is always a conditional promise, which wll

  19. Power transmission cable development for the Space Station Freedom electrical power system

    NASA Technical Reports Server (NTRS)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  20. 31 CFR 560.515 - 30-day delayed effective date for pre-May 7, 1995 trade contracts involving Iran.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-May 7, 1995 trade contracts involving Iran. 560.515 Section 560.515 Money and Finance: Treasury....515 30-day delayed effective date for pre-May 7, 1995 trade contracts involving Iran. (a) All... involving Iran (a pre-existing trade contract), including the exportation of goods, services (including...

  1. Examining the Need for a Code of Conduct in New Jersey Teacher Union Contracts

    ERIC Educational Resources Information Center

    Guarneri, Cristina M.

    2009-01-01

    The purpose of this cross-sectional, comparison study attempted to investigate if a code of conduct existed in New Jersey teacher union contracts to nursing/hospital union contracts. Archived data of public school district and nursing/hospital union contracts held with the New Jersey Public Employment Relations Committee (NJ PERC) and Health…

  2. 7 CFR 400.205 - Denial or termination of contract and administrative reassignment of business.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reassignment of business. 400.205 Section 400.205 Agriculture Regulations of the Department of Agriculture... administrative reassignment of business. Non-compliance with these standards will result in: (a) The denial of a Contract; or (b) Termination of an existing Contract. In the event of denial or termination of the Contract...

  3. Self-regulation in dentistry and the social contract.

    PubMed

    Holden, A C L

    2016-10-21

    This article looks at the General Dental Council (GDC) and dental regulation from the perspective of social contract theory. Self-regulation is a requirement for the dental profession to exist within such a contract with society and this article seeks to examine the effects of the GDC upon the social contract. The GDC maintains that it is independent of the dental profession and while this may be true when discussing impartiality, the existence and purpose of the GDC is intrinsically intertwined with the dental profession. This article will show that the GDC has acted in a manner that has a negative impact upon the social contract between the dental profession and society and that for the dental profession to maintain its status and ability to place patients first, the GDC needs to re-evaluate its role and attitudes.

  4. LPTA Versus Tradeoff: How Procurement Methods Can Impact Contract Performance

    DTIC Science & Technology

    2015-06-01

    and Technology BBP Better Buying Power BPA Blanket Purchase Agreement CAR Contract Action Report COR Contracting Officer’s...Blanket Purchase Agreements ( BPAs ), which utilize streamlined contracting in the form of orders to award requirements faster. Under IDIQs, GSA vehicles...and BPA agreements the rates are typically pre-negotiated with the set of vendors, leaving little necessity for negotiation and tradeoff tactics

  5. Electronics Research at the University of Texas at Austin.

    DTIC Science & Technology

    1982-09-15

    AD-A122 219 ELECTRONICS RESEARCH AT THE UNIVERSITY OF TEXAS AT 13 AUSTIN(U) TEXAS UNIV AT AUSTIN ELECTRONICS RESEARCH C ENTER E J POWERS 15 SEP 82...1982 JOINT SERVICES ELECTRONICS PROGRAM Research Contract AFOSR F49620-77-C-0101 Submitted by Edward J. Powers on Behalf of the Faculty and Staff of the...PERFORMING ORG. REPORT NUMBER 7,TO) 8. CONTRACT OR GRANT NuMBEUHR) Edward J. Powers , Director; and other faculty and graduate researCh staff of the

  6. 77 FR 9698 - Notice of Continuation of Visitor Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ...Pursuant to the terms of existing concession contracts, the National Park Service hereby gives notice that it has continued visitor services for a period not-to-exceed 1 year from the date of contract expiration with respect to the listed contracts.

  7. Shoulder Rotator Muscle Dynamometry Characteristics: Side Asymmetry and Correlations with Ball-Throwing Speed in Adolescent Handball Players

    PubMed Central

    Pontaga, Inese; Zidens, Janis

    2014-01-01

    The aim of the investigation was to: 1) compare shoulder external/internal rotator muscles’ peak torques and average power values and their ratios in the dominant and non-dominant arm; 2) determine correlations between shoulder rotator muscles’ peak torques, average power and ball-throwing speed in handball players. Fourteen 14 to 15-year-old male athletes with injury-free shoulders participated in the study (body height: 176 ± 7 cm, body mass 63 ± 9 kg). The tests were carried out by an isokinetic dynamometer system in the shoulder internal and external rotation movements at angular velocities of 60°/s, 90°/s and 240°/s during concentric contractions. The eccentric external– concentric internal rotator muscle contractions were performed at the velocity of 90°/s. The player threw a ball at maximal speed keeping both feet on the floor. The speed was recorded with reflected light rays. Training in handball does not cause significant side asymmetry in shoulder external/internal rotator muscle peak torques or the average power ratio. Positive correlations between isokinetic characteristics of the shoulder internal and external rotator muscles and ball-throwing speed were determined. The power produced by internal rotator muscles during concentric contractions after eccentric contractions of external rotator muscles was significantly greater in the dominant than in the non-dominant arm. Thus, it may be concluded that the shoulder eccentric external/concentric internal rotator muscle power ratio is significantly greater than this ratio in the concentric contractions of these muscles. PMID:25414738

  8. Sample Language of Modified Contract Elements from Existing CBAs, MOUs, or EWAs to Support Turnaround

    ERIC Educational Resources Information Center

    Mass Insight Education (NJ1), 2011

    2011-01-01

    Organized by the key conditions areas for turnaround, "People, Program, Time and Money," this tool offers sample language for each contract element to serve as a model for modifications from a traditional CBA that may support a district's turnaround efforts. Sample language is offered from existing provisions in district-wide collective bargaining…

  9. The effects of passive leg press training on jumping performance, speed, and muscle power.

    PubMed

    Liu, Chiang; Chen, Chuan-Shou; Ho, Wei-Hua; Füle, Róbert János; Chung, Pao-Hung; Shiang, Tzyy-Yuang

    2013-06-01

    Passive leg press (PLP) training was developed based on the concepts of the stretch-shortening cycle (SSC) and the benefits of high muscle contraction velocity. Passive leg press training enables lower limb muscle groups to apply a maximum downward force against a platform moved up and down at high frequency by an electric motor. Thus, these muscle groups accomplished both concentric and eccentric isokinetic contractions in a passive, rapid, and repetitive manner. This study investigates the effects of 10 weeks of PLP training at high and low movement frequencies have on jumping performance, speed, and muscle power. The authors selected 30 college students who had not performed systematic resistance training in the previous 6 months, including traditional resistance training at a squat frequency of 0.5 Hz, PLP training at a low frequency of 0.5 Hz, and PLP training at a high frequency of 2.5 Hz, and randomly divided them into 3 groups (n = 10). The participants' vertical jump, drop jump, 30-m sprint performance, explosive force, and SSC efficiency were tested under the same experimental procedures at pre- and post-training. Results reveal that high-frequency PLP training significantly increased participants' vertical jump, drop jump, 30-m sprint performance, instantaneous force, peak power, and SSC efficiency (p < 0.05). Additionally, their change rate abilities were substantially superior to those of the traditional resistance training (p < 0.05). The low-frequency PLP training significantly increased participants' vertical jump, 30-m sprint performance, instantaneous force, and peak power (p < 0.05). However, traditional resistance training only increased participants' 30-m sprint performance and peak power (p < 0.05). The findings suggest that jump performance, speed, and muscle power significantly improved after 10 weeks of PLP training at high movement frequency. A PLP training machine powered by an electrical motor enables muscles of the lower extremities to contract faster compared with voluntary contraction. Therefore, muscle training with high contraction velocity is one of the main methods of increasing muscle power. Passive leg press training is a unique method for enhancing jump performance, speed, and muscle power.

  10. 18 CFR 2.103 - Statement of policy respecting take or pay provisions in gas purchase contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Statement of policy respecting take or pay provisions in gas purchase contracts. 2.103 Section 2.103 Conservation of Power and..., As Amended, and Executive Orders 11615 and 11627 § 2.103 Statement of policy respecting take or pay...

  11. Policing Mechanisms in Agricultural Contracts

    ERIC Educational Resources Information Center

    Wolf, Steven; Hueth, Brent; Ligon, Ethan

    2001-01-01

    In this paper we focus on mechanisms of coordination in agricultural contracts. Our approach is intended to advance understanding of social relations of production and distribution of power in agrofood systems. Through an analysis of contracts between farmers and intermediaries (e.g., processors, shippers, consignment agents) for California fruits…

  12. Contraction design for small low-speed wind tunnels

    NASA Technical Reports Server (NTRS)

    Bell, James H.; Mehta, Rabindra D.

    1988-01-01

    An iterative design procedure was developed for two- or three-dimensional contractions installed on small, low-speed wind tunnels. The procedure consists of first computing the potential flow field and hence the pressure distributions along the walls of a contraction of given size and shape using a three-dimensional numerical panel method. The pressure or velocity distributions are then fed into two-dimensional boundary layer codes to predict the behavior of the boundary layers along the walls. For small, low-speed contractions it is shown that the assumption of a laminar boundary layer originating from stagnation conditions at the contraction entry and remaining laminar throughout passage through the successful designs if justified. This hypothesis was confirmed by comparing the predicted boundary layer data at the contraction exit with measured data in existing wind tunnels. The measured boundary layer momentum thicknesses at the exit of four existing contractions, two of which were 3-D, were found to lie within 10 percent of the predicted values, with the predicted values generally lower. From the contraction wall shapes investigated, the one based on a fifth-order polynomial was selected for installation on a newly designed mixing layer wind tunnel.

  13. Contraction design for small low-speed wind tunnels

    NASA Technical Reports Server (NTRS)

    Bell, James H.; Mehta, Rabindra D.

    1988-01-01

    An iterative design procedure was developed for 2- or 3-dimensional contractions installed on small, low speed wind tunnels. The procedure consists of first computing the potential flow field and hence the pressure distributions along the walls of a contraction of given size and shape using a 3-dimensional numerical panel method. The pressure or velocity distributions are then fed into 2-dimensional boundary layer codes to predict the behavior of the boundary layers along the walls. For small, low speed contractions, it is shown that the assumption of a laminar boundary layer originating from stagnation conditions at the contraction entry and remaining laminar throughout passage through the successful designs is justified. This hypothesis was confirmed by comparing the predicted boundary layer data at the contraction exit with measured data in existing wind tunnels. The measured boundary layer momentum thicknesses at the exit of four existing contractions, two of which were 3-D, were found to lie within 10 percent of the predicted values, with the predicted values generally lower. From the contraction wall shapes investigated, the one based on a 5th order polynomial was selected for newly designed mixing wind tunnel installation.

  14. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  15. A 3-D Magnetic Analysis of a Linear Alternator For a Stirling Power System

    NASA Technical Reports Server (NTRS)

    Geng, Steven M.; Schwarze, Gene E.; Niedra, Janis M.

    2000-01-01

    The NASA Glenn Research Center and the Department of Energy (DOE) are developing advanced radioisotope Stirling convertors, under contract with Stirling Technology Company (STC), for space applications. Of critical importance to the successful development of the Stirling convertor for space power applications is the development of a lightweight and highly efficient linear alternator. This paper presents a 3-D finite element method (FEM) approach for evaluating Stirling convertor linear alternators. Preliminary correlations with open-circuit voltage measurements provide an encouraging level of confidence in the model. Spatial plots of magnetic field strength (H) are presented in the region of the exciting permanent magnets. These plots identify regions of high H, where at elevated temperature and under electrical load, the potential to alter the magnetic moment of the magnets exists. This implies the need for further testing and analysis.

  16. A motor unit-based model of muscle fatigue

    PubMed Central

    2017-01-01

    Muscle fatigue is a temporary decline in the force and power capacity of skeletal muscle resulting from muscle activity. Because control of muscle is realized at the level of the motor unit (MU), it seems important to consider the physiological properties of motor units when attempting to understand and predict muscle fatigue. Therefore, we developed a phenomenological model of motor unit fatigue as a tractable means to predict muscle fatigue for a variety of tasks and to illustrate the individual contractile responses of MUs whose collective action determines the trajectory of changes in muscle force capacity during prolonged activity. An existing MU population model was used to simulate MU firing rates and isometric muscle forces and, to that model, we added fatigue-related changes in MU force, contraction time, and firing rate associated with sustained voluntary contractions. The model accurately estimated endurance times for sustained isometric contractions across a wide range of target levels. In addition, simulations were run for situations that have little experimental precedent to demonstrate the potential utility of the model to predict motor unit fatigue for more complicated, real-world applications. Moreover, the model provided insight into the complex orchestration of MU force contributions during fatigue, that would be unattainable with current experimental approaches. PMID:28574981

  17. 50 kW on-site concentrating solar photovoltaic power system. Phase I: design. Final report, 1 June 1978-28 February 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pittman, P F

    1979-03-30

    This contract is part of a three phase program to design, fabricate, and operate a solar photovoltaic electric power system with concentrating optics. The system will be located beside a Local Operating Headquarters of the Georgia Power Company in Atlanta, Georgia and will provide part of the power for the on-site load. Fresnel lens concentrators will be used in 2-axis tracking arrays to focus solar energy onto silicon solar cells producing a peak power output of 56 kW. The present contract covers Phase I which has as its objective the complete design of the system and necessary subsystems.

  18. "Financial Emergency" and the Faculty Furlough: A Breach of Contract.

    ERIC Educational Resources Information Center

    Richards, Mary Sanders

    1984-01-01

    The power of the university to breach faculty contracts in order to meet its temporary cash-flow problems and the rights of faculty when this breach occurs are discussed. To avoid litigation, a university must have established internal guidelines which can be incorporated into an employment contract. (MLW)

  19. 78 FR 76849 - National Heart, Lung, and Blood Institute; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ...), Title 5 U.S.C., as amended. The contract proposals and the discussions could disclose confidential trade... individuals associated with the contract proposals, the disclosure of which would constitute a clearly... Emphasis Panel; SBIR Phase II Contract Review--Powering Ventricular Assist Devices. Date: January 14, 2014...

  20. 41 CFR 51-10.160 - Communications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Communications. 51-10.160 Section 51-10.160 Public Contracts and Property Management Other Provisions Relating to Public Contracts... vision or hearing, can obtain information as to the existence and location of accessible services...

  1. Analysis of the 918th Contracting Battalion and 410th Contracting Support Brigade Utilizing the Contract Management Maturity Model

    DTIC Science & Technology

    2015-12-01

    organizational structure of Army contracting and the changes to that organization under the MICC 2025 plan. We then describe the organizations where we... organizational change . Portal: Libraries and the Academy, 4(3), 345–361. McFall, T. (2015). 918th CBN/MICC-FC organizational overview [PowerPoint slides...Installation Contracting Command (MICC) are undergoing a significant change in structure known as MICC 2025. In order to gauge the effectiveness of this

  2. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    DTIC Science & Technology

    2016-09-01

    education/ training , communication, staff levels, oversight, and leadership support by comparing and contrasting Army COR contract administration...processes from a CONUS and OCONUS perspective. The results inform Army Contracting leadership about differences and discrepancies that exist in the training ...five common COR issues that need to be addressed: education/ training , communication, staff Levels, oversight, and leadership support. We found that

  3. Effects of shape and stroke parameters on the propulsion performance of an axisymmetric swimmer.

    PubMed

    Peng, Jifeng; Alben, Silas

    2012-03-01

    In nature, there exists a special group of aquatic animals which have an axisymmetric body and whose primary swimming mechanism is to use periodic body contractions to generate vortex rings in the surrounding fluid. Using jellyfish medusae as an example, this study develops a mathematical model of body kinematics of an axisymmetric swimmer and uses a computational approach to investigate the induced vortex wakes. Wake characteristics are identified for swimmers using jet propulsion and rowing, two mechanisms identified in previous studies of medusan propulsion. The parameter space of body kinematics is explored through four quantities: a measure of body shape, stroke amplitude, the ratio between body contraction duration and extension duration, and the pulsing frequency. The effects of these parameters on thrust, input power requirement and circulation production are quantified. Two metrics, cruising speed and energy cost of locomotion, are used to evaluate the propulsion performance. The study finds that a more prolate-shaped swimmer with larger stroke amplitudes is able to swim faster, but its cost of locomotion is also higher. In contrast, a more oblate-shaped swimmer with smaller stroke amplitudes uses less energy for its locomotion, but swims more slowly. Compared with symmetric strokes with equal durations of contraction and extension, faster bell contractions increase the swimming speed whereas faster bell extensions decrease it, but both require a larger energy input. This study shows that besides the well-studied correlations between medusan body shape and locomotion, stroke variables also affect the propulsion performance. It provides a framework for comparing the propulsion performance of axisymmetric swimmers based on their body kinematics when it is difficult to measure and analyze their wakes empirically. The knowledge from this study is also useful for the design of robotic swimmers that use axisymmetric body contractions for propulsion.

  4. 41 CFR 60-20.4 - Seniority system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Seniority system. 60-20.4 Section 60-20.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISCRIMINATION GUIDELINES § 60-20.4 Seniority system. Where they exist, seniority lines and lists must not be...

  5. 41 CFR 60-20.4 - Seniority system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Seniority system. 60-20.4 Section 60-20.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISCRIMINATION GUIDELINES § 60-20.4 Seniority system. Where they exist, seniority lines and lists must not be...

  6. 77 FR 77047 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...; System of Records AGENCY: Defense Contract Audit Agency, DoD. ACTION: Notice to delete a Systems of Records. SUMMARY: The Defense Contract Audit Agency (DCAA) is deleting a system of records in its existing... at (703) 767-1022. SUPPLEMENTARY INFORMATION: The Defense Contract Audit Agency (DCAA) systems of...

  7. 77 FR 77048 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...; System of Records AGENCY: Defense Contract Audit Agency, DoD. ACTION: Notice to amend a System of Records. SUMMARY: The Defense Contract Audit Agency is amending a system of records notice in its existing.... SUPPLEMENTARY INFORMATION: The Defense Contract Audit Agency systems of records notices subject to the Privacy...

  8. 48 CFR 19.502-2 - Total small business set-asides.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchases on an unrestricted basis, the contracting officer shall include in the contract file the reason for this unrestricted purchase. If the contracting officer receives only one acceptable offer from a... important, it is not the only factor to be considered in determining whether a reasonable expectation exists...

  9. 41 CFR 60-20.4 - Seniority system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Seniority system. 60-20.4 Section 60-20.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISCRIMINATION GUIDELINES § 60-20.4 Seniority system. Where they exist, seniority lines and lists must not be...

  10. The difference between energy consumption and energy cost: Modelling energy tariff structures for water resource recovery facilities.

    PubMed

    Aymerich, I; Rieger, L; Sobhani, R; Rosso, D; Corominas, Ll

    2015-09-15

    The objective of this paper is to demonstrate the importance of incorporating more realistic energy cost models (based on current energy tariff structures) into existing water resource recovery facilities (WRRFs) process models when evaluating technologies and cost-saving control strategies. In this paper, we first introduce a systematic framework to model energy usage at WRRFs and a generalized structure to describe energy tariffs including the most common billing terms. Secondly, this paper introduces a detailed energy cost model based on a Spanish energy tariff structure coupled with a WRRF process model to evaluate several control strategies and provide insights into the selection of the contracted power structure. The results for a 1-year evaluation on a 115,000 population-equivalent WRRF showed monthly cost differences ranging from 7 to 30% when comparing the detailed energy cost model to an average energy price. The evaluation of different aeration control strategies also showed that using average energy prices and neglecting energy tariff structures may lead to biased conclusions when selecting operating strategies or comparing technologies or equipment. The proposed framework demonstrated that for cost minimization, control strategies should be paired with a specific optimal contracted power. Hence, the design of operational and control strategies must take into account the local energy tariff. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Wetland Water Cooling Partnership: The Use of Constructed Wetlands to Enhance Thermoelectric Power Plant Cooling and Mitigate the Demand of Surface Water Use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Apfelbaum, Steven L.; Duvall, Kenneth W.; Nelson, Theresa M.

    Through the Phase I study segment of contract #DE-NT0006644 with the U.S. Department of Energy’s National Energy Technology Laboratory, Applied Ecological Services, Inc. and Sterling Energy Services, LLC (the AES/SES Team) explored the use of constructed wetlands to help address stresses on surface water and groundwater resources from thermoelectric power plant cooling and makeup water requirements. The project objectives were crafted to explore and develop implementable water conservation and cooling strategies using constructed wetlands (not existing, naturally occurring wetlands), with the goal of determining if this strategy has the potential to reduce surface water and groundwater withdrawals of thermoelectric powermore » plants throughout the country. Our team’s exploratory work has documented what appears to be a significant and practical potential for augmenting power plant cooling water resources for makeup supply at many, but not all, thermoelectric power plant sites. The intent is to help alleviate stress on existing surface water and groundwater resources through harvesting, storing, polishing and beneficially re-using critical water resources. Through literature review, development of conceptual created wetland plans, and STELLA-based modeling, the AES/SES team has developed heat and water balances for conventional thermoelectric power plants to evaluate wetland size requirements, water use, and comparative cooling technology costs. The ecological literature on organism tolerances to heated waters was used to understand the range of ecological outcomes achievable in created wetlands. This study suggests that wetlands and water harvesting can provide a practical and cost-effective strategy to augment cooling waters for thermoelectric power plants in many geographic settings of the United States, particularly east of the 100th meridian, and in coastal and riverine locations. The study concluded that constructed wetlands can have significant positive ancillary socio-economic, ecosystem, and water treatment/polishing benefits when used to complement water resources at thermoelectric power plants. Through the Phase II pilot study segment of the contract, the project team partnered with Progress Energy Florida (now Duke Energy Florida) to quantify the wetland water cooling benefits at their Hines Energy Complex in Bartow, Florida. The project was designed to test the wetland’s ability to cool and cleanse power plant cooling pond water while providing wildlife habitat and water harvesting benefits. Data collected during the monitoring period was used to calibrate a STELLA model developed for the site. It was also used to inform management recommendations for the demonstration site, and to provide guidance on the use of cooling wetlands for other power plants around the country. As a part of the pilot study, Duke Energy is scaling up the demonstration project to a larger, commercial scale wetland instrumented with monitoring equipment. Construction is expected to be finalized in early 2014.« less

  12. Analysis of Defense Products Contract Trends, 1990-2014

    DTIC Science & Technology

    2015-04-30

    contract obligations) are not properly classified under their parent programs. Electronics & Communications Contract obligations for Electronics...Electronics & Communications , Engines & Power Plants, Fuels, Ground Vehicles, Launchers & Munitions, Missiles & Space, Ships, and “Other.”3 This...mostly comprised of platforms and programs related to MDAPs (Clothing & Subsistence, Electronics & Communications , Fuels, Launchers & Munitions, and

  13. Fatigue and recovery from dynamic contractions in men and women differ for arm and leg muscles.

    PubMed

    Senefeld, Jonathon; Yoon, Tejin; Bement, Marie Hoeger; Hunter, Sandra K

    2013-09-01

    Whether there is a gender difference in fatigue and recovery from maximal velocity fatiguing contractions and across muscles is not understood. Sixteen men and 19 women performed 90 isotonic contractions at maximal voluntary shortening velocity (maximal velocity concentric contractions, MVCC) with the elbow flexor and knee extensor muscles (separate days) at a load equivalent to 20% maximal voluntary isometric contraction (MVIC). Power (from MVCCs) decreased similarly for men and women for both muscles (P > 0.05). Men and women had similar declines in MVIC of elbow flexors, but men had greater reductions in knee extensor MVIC force and MVIC electromyogram activity than women (P < 0.05). The decline in MVIC and power was greater, and force recovery was slower for the elbow flexors compared with knee extensors. The gender difference in muscle fatigue often observed during isometric tasks was diminished during fast dynamic contractions for upper and lower limb muscles. Copyright © Published 2013 by Wiley Periodicals, Inc. This article is a US Government wmusork and, as such, is in the public domain in the United States of America.

  14. Do you know your business associates?

    PubMed

    Hinkley, Gerald M; Glitz, Rachel; Hirsch, W Reece

    2003-01-01

    HIPAA's business associate rules require covered entities to identify their business associates and enter into contracts with them to safeguard the privacy of individually identifiable health information. Covered entities need to determine who their business associates are and whether exceptions apply. Covered entities need to examine their business associate contracts to ensure that the contracts contain provisions required by HIPAA. Covered entities should not enter into business associate contracts unnecessarily. Existing business associate contracts are subject to a transition period for compliance with HIPAA.

  15. Effects of cross-bridge compliance on the force-velocity relationship and muscle power output

    PubMed Central

    Fenwick, Axel J.; Wood, Alexander M.

    2017-01-01

    Muscles produce force and power by utilizing chemical energy through ATP hydrolysis. During concentric contractions (shortening), muscles generate less force compared to isometric contractions, but consume greater amounts of energy as shortening velocity increases. Conversely, more force is generated and less energy is consumed during eccentric muscle contractions (lengthening). This relationship between force, energy use, and the velocity of contraction has important implications for understanding muscle efficiency, but the molecular mechanisms underlying this behavior remain poorly understood. Here we used spatially-explicit, multi-filament models of Ca2+-regulated force production within a half-sarcomere to simulate how force production, energy utilization, and the number of bound cross-bridges are affected by dynamic changes in sarcomere length. These computational simulations show that cross-bridge binding increased during slow-velocity concentric and eccentric contractions, compared to isometric contractions. Over the full ranges of velocities that we simulated, cross-bridge cycling and energy utilization (i.e. ATPase rates) increased during shortening, and decreased during lengthening. These findings are consistent with the Fenn effect, but arise from a complicated relationship between velocity-dependent cross-bridge recruitment and cross-bridge cycling kinetics. We also investigated how force production, power output, and energy utilization varied with cross-bridge and myofilament compliance, which is impossible to address under typical experimental conditions. These important simulations show that increasing cross-bridge compliance resulted in greater cross-bridge binding and ATPase activity, but less force was generated per cross-bridge and throughout the sarcomere. These data indicate that the efficiency of force production decreases in a velocity-dependent manner, and that this behavior is sensitive to cross-bridge compliance. In contrast, significant effects of myofilament compliance on force production were only observed during isometric contractions, suggesting that changes in myofilament compliance may not influence power output during non-isometric contractions as greatly as changes in cross-bridge compliance. These findings advance our understanding of how cross-bridge and myofilament properties underlie velocity-dependent changes in contractile efficiency during muscle movement. PMID:29284062

  16. Effects of cross-bridge compliance on the force-velocity relationship and muscle power output.

    PubMed

    Fenwick, Axel J; Wood, Alexander M; Tanner, Bertrand C W

    2017-01-01

    Muscles produce force and power by utilizing chemical energy through ATP hydrolysis. During concentric contractions (shortening), muscles generate less force compared to isometric contractions, but consume greater amounts of energy as shortening velocity increases. Conversely, more force is generated and less energy is consumed during eccentric muscle contractions (lengthening). This relationship between force, energy use, and the velocity of contraction has important implications for understanding muscle efficiency, but the molecular mechanisms underlying this behavior remain poorly understood. Here we used spatially-explicit, multi-filament models of Ca2+-regulated force production within a half-sarcomere to simulate how force production, energy utilization, and the number of bound cross-bridges are affected by dynamic changes in sarcomere length. These computational simulations show that cross-bridge binding increased during slow-velocity concentric and eccentric contractions, compared to isometric contractions. Over the full ranges of velocities that we simulated, cross-bridge cycling and energy utilization (i.e. ATPase rates) increased during shortening, and decreased during lengthening. These findings are consistent with the Fenn effect, but arise from a complicated relationship between velocity-dependent cross-bridge recruitment and cross-bridge cycling kinetics. We also investigated how force production, power output, and energy utilization varied with cross-bridge and myofilament compliance, which is impossible to address under typical experimental conditions. These important simulations show that increasing cross-bridge compliance resulted in greater cross-bridge binding and ATPase activity, but less force was generated per cross-bridge and throughout the sarcomere. These data indicate that the efficiency of force production decreases in a velocity-dependent manner, and that this behavior is sensitive to cross-bridge compliance. In contrast, significant effects of myofilament compliance on force production were only observed during isometric contractions, suggesting that changes in myofilament compliance may not influence power output during non-isometric contractions as greatly as changes in cross-bridge compliance. These findings advance our understanding of how cross-bridge and myofilament properties underlie velocity-dependent changes in contractile efficiency during muscle movement.

  17. The Joint Effects-Based Contracting Execution System: A Proposed Enabling Concept for Future Joint Expeditionary Contracting Execution

    DTIC Science & Technology

    2008-12-01

    average 1 hour per response, including the time for reviewing instruction, searching existing data sources , gathering and maintaining the data needed...Representative for the Contracting Officer on five contracts whose value xii exceeded $200 million and participated on four source selection committees...roles on source selection boards; Consolidated Husbanding Services for all Pacific Ports, Consolidated MWR services for the Pacific, Software

  18. Status update of a free-piston Stirling convertor for radioisotope space power systems

    NASA Astrophysics Data System (ADS)

    White, Maurice; Qiu, Songgang; Augenblick, Jack; Peterson, Allen; Faultersack, Frank

    2001-02-01

    Free-piston Stirling engines offer a relatively mature technology that is well-suited for advanced, high-efficiency radioisotope space power systems. This paper updates results from a combination of DOE and NASA contracts with Stirling Technology Company (STC). These contracts have demonstrated STC's Stirling convertor technology in a configuration and power level representative of a space power system. Based on demonstrated performance, long-life maintenance-free technology heritage, and success with aggressively imposed vibration testing. DOE has awarded system integration contracts to Boeing, Lockheed Martin and Teledyne Energy Systems. The objectives of these competitive Phase I contracts are to develop complete spacecraft power system conceptual designs based on the STC Stirling convertor, and to plan subsequent phases for two launches. Performance results for the DOE 55-W(e) Technology Demonstration Convertors (TDC's) have met original projections. Although the TDC's were intended only for technology demonstration, they have achieved very aggressive efficiency goals, demonstrated convertor-induced vibration levels below the Jet Propulsion Laboratory (JPL) specifications, passed a simulated launch load vibration test at 0.2 g2/Hz (12.3 g rms), and met EMI/EMC goals for most contemplated missions. No consideration for EMI reduction was included in the TDC design. Minor changes are underway to reduce EMI levels, with a goal of meeting specifications for missions such as Solar Probe with highly sensitive instrumentation. The long-term objective for DOE is to develop a power system with a system efficiency exceeding 20% that can function with a high degree of reliability for 10 years and longer on deep space missions. .

  19. Market assessment of photovoltaic power systems for agricultural applications in Colombia

    NASA Technical Reports Server (NTRS)

    Steigelmann, W.; Neyeloff, S.

    1981-01-01

    The market potential for photovoltaic systems in the agricultural sector of Colombia is assessed. Consideration was given to over twenty specific livestock production, crop production, and rural services applications requiring less than 15 kW of power without backup power. Analysis revealed that near-term potential exists for photovoltaic technology in applications in coffee depulging, cattle watering, rural domestic users, rural water supply and small irrigation, rural telephones, rural health posts, and vaccine refrigeration. Market size would be in the 1200 to 2500 kWp range in the 1981 to 86 timeframe. Positive factors influencing the market size include a lack of electrical services, potential for developing the Llanos Orientales Territory, high fuel costs in remote areas, balance of system availability, the presence of wealthy land owners, and a large government-sponsored contract for photovoltaic (PV)-powered rural telephone systems. The anticipated eligibility of photovoltaic equipment for loans would be a further positive factor in market potential. Important negative factors include relatively inexpensive energy in developed locations, reliance on hydropower, lack of familiarity with PV equipment, a lack of financing, and established foreign competition in PV technology. Recommendations to American PV manufacturers attempting to develop the Colombian market are given.

  20. Market assessment of photovoltaic power systems for agricultural applications in Colombia

    NASA Astrophysics Data System (ADS)

    Steigelmann, W.; Neyeloff, S.

    1981-11-01

    The market potential for photovoltaic systems in the agricultural sector of Colombia is assessed. Consideration was given to over twenty specific livestock production, crop production, and rural services applications requiring less than 15 kW of power without backup power. Analysis revealed that near-term potential exists for photovoltaic technology in applications in coffee depulging, cattle watering, rural domestic users, rural water supply and small irrigation, rural telephones, rural health posts, and vaccine refrigeration. Market size would be in the 1200 to 2500 kWp range in the 1981 to 86 timeframe. Positive factors influencing the market size include a lack of electrical services, potential for developing the Llanos Orientales Territory, high fuel costs in remote areas, balance of system availability, the presence of wealthy land owners, and a large government-sponsored contract for photovoltaic (PV)-powered rural telephone systems. The anticipated eligibility of photovoltaic equipment for loans would be a further positive factor in market potential. Important negative factors include relatively inexpensive energy in developed locations, reliance on hydropower, lack of familiarity with PV equipment, a lack of financing, and established foreign competition in PV technology. Recommendations to American PV manufacturers attempting to develop the Colombian market are given.

  1. Physician Personal Services Contract Enforceability: The Influence of the Thirteenth Amendment.

    PubMed

    Fasko, Steven A; Kerr, Bernard J; Alvarez, M Raymond; Westrum, Andrew

    We explore the influence of the Thirteenth Amendment to the US Constitution on the enforceability of personal services contracts for physicians. This influence extends from the ambiguous definition to the legal interpretation of personal services contracts. The courts have struggled with determining contracts to be a personal service and whether to grant injunctions for continued performance. The award or denial of damages due to a breach of contract is vested in these enforceability complications. Because of the Thirteenth Amendment's influence, courts and contracting parties will continue to struggle with physician personal services contract enforceability; although other points of view may exist. Possible solutions are offered for health care contract managers dealing with challenges attributable to physician personal services contracts.

  2. 78 FR 25072 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ...., Central Power & Lime LLC, Triton Power Michigan LLC, Utility Contract Funding, L.L.C. Description...: ER13-1097-001. Applicants: Central Power & Lime LLC. Description: Amendment to revisions to market...

  3. Work Done by Titin Protein Folding Assists Muscle Contraction.

    PubMed

    Rivas-Pardo, Jaime Andrés; Eckels, Edward C; Popa, Ionel; Kosuri, Pallav; Linke, Wolfgang A; Fernández, Julio M

    2016-02-16

    Current theories of muscle contraction propose that the power stroke of a myosin motor is the sole source of mechanical energy driving the sliding filaments of a contracting muscle. These models exclude titin, the largest protein in the human body, which determines the passive elasticity of muscles. Here, we show that stepwise unfolding/folding of titin immunoglobulin (Ig) domains occurs in the elastic I band region of intact myofibrils at physiological sarcomere lengths and forces of 6-8 pN. We use single-molecule techniques to demonstrate that unfolded titin Ig domains undergo a spontaneous stepwise folding contraction at forces below 10 pN, delivering up to 105 zJ of additional contractile energy, which is larger than the mechanical energy delivered by the power stroke of a myosin motor. Thus, it appears inescapable that folding of titin Ig domains is an important, but as yet unrecognized, contributor to the force generated by a contracting muscle. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.

  4. Temporary Employment Contracts in Academia: A Real Option View

    ERIC Educational Resources Information Center

    Brady, Malcolm

    2017-01-01

    This paper examines the strategic use of temporary employment contracts in dealing with supply uncertainty in the form of employee ability that is slow to reveal itself, for example in academia where there exist significant time lags in demonstration of research ability. A temporary contract is modeled as a real option, specifically as a…

  5. Rothe Development Corporation v. Department of Defense: The Constitutionality of Federal Contracting Programs for Minority-Owned and Other Small Business

    DTIC Science & Technology

    2009-03-16

    not have sufficient evidence to conclude that there was racial discrimination in defense contracting when it reauthorized the program in 2006. This...report examines the Rothe decision in detail; describes existing contracting programs for minority-owned and women -owned small businesses; and analyzes

  6. Court Cases Involving Contracts for School Districts

    ERIC Educational Resources Information Center

    Allen, L. Hank

    2011-01-01

    The purpose of this research was to analyze trends in the United States regarding contract disputes that exist in school districts. Court cases were identified at the state and federal level to determine the outcomes and the fact patterns of contract disputes. To gain the knowledge of how courts handle cases of contractual breach, contracts…

  7. 7 CFR 1468.22 - Conservation practice operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operation and maintenance is occurring. (b) For those persons who are signatories to existing CRP or EQIP contracts, or WRP cost-share agreements, practices will be transferred from EQIP and CRP contracts or WRP... rights and obligations under CRP, EQIP, or WRP will be incorporated into the new CFO contract. Practices...

  8. 48 CFR 1852.232-77 - Limitation of funds (fixed-price contract).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... allotment of funds for the total price of said work except for rights and obligations then existing under...-price contract). 1852.232-77 Section 1852.232-77 Federal Acquisition Regulations System NATIONAL... Provisions and Clauses 1852.232-77 Limitation of funds (fixed-price contract). As prescribed in 1832.705-270...

  9. A Quest for Efficiencies: Total System Performance Responsibility

    DTIC Science & Technology

    2002-04-01

    Program Office................................ 22 Contract Law Comments...resources and suppliers. 25 Contract Law Comments An integral member of any acquisition team is the legal expert(s) from the Staff Judge...Eglin AFB and Hanscom AFB were sent surveys in order to determine what cautions and concerns exist based on their contract law experiences. Getting

  10. 7 CFR 1717.608 - RUS approval of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... preceding execution of the contract. This requirement applies regardless of the source of funding of any... contained in any power supply arrangement subject to RUS approval, which merely has the effect of either...

  11. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  12. Air Conditioner/Dehumidifier

    NASA Technical Reports Server (NTRS)

    1986-01-01

    An ordinary air conditioner in a very humid environment must overcool the room air, then reheat it. Mr. Dinh, a former STAC associate, devised a heat pipe based humidifier under a NASA Contract. The system used heat pipes to precool the air; the air conditioner's cooling coil removes heat and humidity, then the heat pipes restore the overcooled air to a comfortable temperature. The heat pipes use no energy, and typical savings are from 15-20%. The Dinh Company also manufactures a "Z" coil, a retrofit cooling coil which may be installed on an existing heater/air conditioner. It will also provide free hot water. The company has also developed a photovoltaic air conditioner and solar powered water pump.

  13. 48 CFR 42.1205 - Agreement to recognize contractor's change of name.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... each the contract number and type, and name and address of the contracting office. The contracting... executed this Agreement as of the day and year first above written. UNITED STATES OF AMERICA, By Title ABC... governing body and within the scope of its corporate powers. Witness my hand and the seal of this...

  14. 77 FR 63205 - Enforcement of Subsidiary and Affiliate Contracts by the FDIC as Receiver of a Covered Financial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... stability of the United States (a ``covered financial company''), to enforce contracts of subsidiaries or... that poses a systemic risk to the nation's economic stability and outlines the process for the orderly... the Corporation, as receiver for a covered financial company, has the power ``to enforce contracts of...

  15. Neuromuscular fatigue following constant versus variable-intensity endurance cycling in triathletes.

    PubMed

    Lepers, R; Theurel, J; Hausswirth, C; Bernard, T

    2008-07-01

    The aim of this study was to determine whether or not variable power cycling produced greater neuromuscular fatigue of knee extensor muscles than constant power cycling at the same mean power output. Eight male triathletes (age: 33+/-5 years, mass: 74+/-4 kg, VO2max: 62+/-5 mL kg(-1) min(-1), maximal aerobic power: 392+/-17 W) performed two 30 min trials on a cycle ergometer in a random order. Cycling exercise was performed either at a constant power output (CP) corresponding to 75% of the maximal aerobic power (MAP) or a variable power output (VP) with alternating +/-15%, +/-5%, and +/-10% of 75% MAP approximately every 5 min. Maximal voluntary contraction (MVC) torque, maximal voluntary activation level and excitation-contraction coupling process of knee extensor muscles were evaluated before and immediately after the exercise using the technique of electrically evoked contractions (single and paired stimulations). Oxygen uptake, ventilation and heart rate were also measured at regular intervals during the exercise. Averaged metabolic variables were not significantly different between the two conditions. Similarly, reductions in MVC torque (approximately -11%, P<0.05) after cycling were not different (P>0.05) between CP and VP trials. The magnitude of central and peripheral fatigue was also similar at the end of the two cycling exercises. It is concluded that, following 30 min of endurance cycling, semi-elite triathletes experienced no additional neuromuscular fatigue by varying power (from +/-5% to 15%) compared with a protocol that involved a constant power.

  16. Selenide isotope generator for the Galileo mission. SIG/Galileo contract compliance power prediction technique

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hammel, T.E.; Srinivas, V.

    1978-11-01

    This initial definition of the power degradation prediction technique outlines a model for predicting SIG/Galileo mean EOM power using component test data and data from a module power degradation demonstration test program. (LCL)

  17. PV System 'Availability' as a Reliability Metric -- Improving Standards, Contract Language and Performance Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klise, Geoffrey T.; Hill, Roger; Walker, Andy

    The use of the term 'availability' to describe a photovoltaic (PV) system and power plant has been fraught with confusion for many years. A term that is meant to describe equipment operational status is often omitted, misapplied or inaccurately combined with PV performance metrics due to attempts to measure performance and reliability through the lens of traditional power plant language. This paper discusses three areas where current research in standards, contract language and performance modeling is improving the way availability is used with regards to photovoltaic systems and power plants.

  18. Ensuring Reliable Natural Gas-Fired Generation with Fuel Contracts and Storage - DOE/NETL-2017/1816

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myles, Paul T.; Labarbara, Kirk A.; Logan, Cecilia Elise

    This report finds that natural gas-fired power plants purchase fuel both on the spot market and through firm supply contracts; there do not appear to be clear drivers propelling power plants toward one or the other type. Most natural gas-fired power generators are located near major natural gas transmission pipelines, and most natural gas contracts are currently procured on the spot market. Although there is some regional variation in the type of contract used, a strong regional pattern does not emerge. Whether gas prices are higher with spot or firm contracts varies by both region and year. Natural gas pricesmore » that push the generators higher in the supply curve would make them less likely to dispatch. Most of the natural gas generators discussed in this report would be unlikely to enter firm contracts if the agreed price would decrease their dispatch frequency. The price points at which these generators would be unlikely to enter a firm contract depends upon the region that the generator is in, and how dependent that region is on natural gas. The Electric Reliability Council of Texas (ERCOT) is more dependent on natural gas than either Eastern Interconnection or Western Interconnection. This report shows that above-ground storage is prohibitively expensive with respect to providing storage for an extended operational fuel reserve comparable to the amount of on-site fuel storage used for coal-fired plants. Further, both pressurized and atmospheric tanks require a significant amount of land for storage, even to support one day’s operation at full output. Underground storage offers the only viable option for 30-day operational storage of natural gas, and that is limited by the location of suitable geologic formations and depleted fields.« less

  19. 76 FR 24557 - Privacy Act of 1974; as Amended; Proposed Alteration to an Existing Privacy Act System of Records...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... contracted with ODAR, under a blanket purchase agreement (BPA), to provide expert witness and hearing... hearing reporters contracted under a BPA with ODAR to provide expert witness and verbatim reporter... which each expert and hearing reporter provided services to ODAR), BPA number, contract beginning and...

  20. 25 CFR 273.16 - Powers and duties of Indian Education Committee.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.16... contracts under this part. (2) Make an annual assessment of the learning needs of Indian children in the...

  1. 41 CFR 50-201.1 - The Walsh-Healey Public Contracts Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... expenditures would go to forces tending to depress wages and purchasing power and offending fair social... they are fairly forwarned by inclusion in the contract.” (“Endicott Johnson Corp. v. Perkins, supra...

  2. Effect of Power Exchange of India: An Overview and Key Issues

    NASA Astrophysics Data System (ADS)

    Singh, A.; Chauhan, D. S.; Upadhdhyay, K. G.

    2013-09-01

    There stands no guarantee that if potential market participants are simply provided with the opportunity for trading electricity, there shall be an efficient wholesale electricity market. India, as well as various other developed countries, relies on voluntary agreements as far as electricity trading is concerned. Self, private initiatives to standardize and commodities contracts play an important role in increasing the trading volume to improve efficiency, in developed countries. In accordance with their experiences, this paper suggested a specific strategy to promote bilateral/OTC trading; hence, India needed to develop a master agreement for electricity contracts. This paper discusses that the creating power exchange for short-term trading in the spot market materializing the contract for the convenience of market participants stands particularly important and henceforth is a necessary factor to make sure that spot market is workable and competitive prior to developing a financial contract for electricity trading.

  3. [Prognostic value of chosen parameters of mechanical and bioelectrical uterine activity in prediction of threatening preterm labour].

    PubMed

    Zietek, Jerzy; Sikora, Jerzy; Horoba, Krzysztof; Matonia, Adam; Jezewski, Janusz; Magnucki, Jacek; Kobielska, Lucyna

    2009-03-01

    To record and analyse bioelectrical activity of the uterine muscle in the course of physiological pregnancy, labour and threatening premature labour; to define which parameters from the analysis of both electrohysterogram and mechanical activity signal allow us to predict threatening premature labour. Material comprised 62 pregnant women: Group I--27 patients in their first physiological pregnancy, Group II--21 patients in their first pregnancy with symptoms of threatening premature labour, and Group III--14 patients in the first labour period. The on-line analysis of the mechanical (TOCO) and electrical (EHG) contraction activity relied on determination of quantitative parameters of detected uterine contractions. The obtained statistical results demonstrated a possibility to differentiate between Group I and II through the amplitude and contraction area for EHG signal, and only the contraction amplitude for TOCO signal. Additionally, significant differentiating parameters for electrohysterogram are: contraction power and its median frequency. Analyzing Group I and III, significant differences were noted for contraction amplitude and area obtained both from EHG and TOCO signals. Similarly, the contraction power (from EHG) enables us to assign the contractions either to records from Group I or to labour type. There was no significant difference noted between Group II and III. Identification of pregnant women at risk of premature labour should lead to their inclusion in rigorous perinatal surveillance. This requires novel, more sensitive methods that are able to detect early symptoms of the uterine contraction activity increase. Electrohysterography provides complete information on principles of bioelectrical uterine activity. Quantitative parameters of EHG analysis enable the detection of records (contractions) with the symptoms of premature uterine contraction activity.

  4. Optimal strategies for electric energy contract decision making

    NASA Astrophysics Data System (ADS)

    Song, Haili

    2000-10-01

    The power industry restructuring in various countries in recent years has created an environment where trading of electric energy is conducted in a market environment. In such an environment, electric power companies compete for the market share through spot and bilateral markets. Being profit driven, electric power companies need to make decisions on spot market bidding, contract evaluation, and risk management. New methods and software tools are required to meet these upcoming needs. In this research, bidding strategy and contract pricing are studied from a market participant's viewpoint; new methods are developed to guide a market participant in spot and bilateral market operation. A supplier's spot market bidding decision is studied. Stochastic optimization is formulated to calculate a supplier's optimal bids in a single time period. This decision making problem is also formulated as a Markov Decision Process. All the competitors are represented by their bidding parameters with corresponding probabilities. A systematic method is developed to calculate transition probabilities and rewards. The optimal strategy is calculated to maximize the expected reward over a planning horizon. Besides the spot market, a power producer can also trade in the bilateral markets. Bidding strategies in a bilateral market are studied with game theory techniques. Necessary and sufficient conditions of Nash Equilibrium (NE) bidding strategy are derived based on the generators' cost and the loads' willingness to pay. The study shows that in any NE, market efficiency is achieved. Furthermore, all Nash equilibria are revenue equivalent for the generators. The pricing of "Flexible" contracts, which allow delivery flexibility over a period of time with a fixed total amount of electricity to be delivered, is analyzed based on the no-arbitrage pricing principle. The proposed algorithm calculates the price based on the optimality condition of the stochastic optimization formulation. Simulation examples illustrate the tradeoffs between prices and scheduling flexibility. Spot bidding and contract pricing are not independent decision processes. The interaction between spot bidding and contract evaluation is demonstrated with game theory equilibrium model and market simulation results. It leads to the conclusion that a market participant's contract decision making needs to be further investigated as an integrated optimization formulation.

  5. 47 CFR 22.917 - Emission limitations for cellular equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... frequency ranges must be attenuated below the transmitting power (P) by a factor of at least 43 + 10 log(P... such contract shall maintain a copy of the contract in their station files and disclose it to...

  6. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  7. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  8. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  9. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  10. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    DTIC Science & Technology

    2008-01-01

    that could inform such strategic purchasing decisions. 14 We used the unique contract identification number to check for cross -organization...beds, mattresses, dressers , footlockers) Other (stools, rugs, seats, cabinets, tables, folding chairs, paintings) Generators Various power generators

  11. Welfare Reform: Federal Oversight of State and Local Contracting Can Be Strengthened. Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    Nilsen, Sigurd R.

    The General Accounting Office (GAO) reviewed existing procedures to manage Temporary Assistance for Needy Families (TANF) contracting and also identified problems with regard to management of TANF contracting. The major data collection activities were as follows: (1) a national survey of all 50 states, the District of Columbia, and the 10 counties…

  12. Instrument to measure psychological contract violation in pharmacy students.

    PubMed

    Spies, Alan R; Wilkin, Noel E; Bentley, John P; Bouldin, Alicia S; Wilson, Marvin C; Holmes, Erin R

    2010-08-10

    To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations.

  13. 76 FR 74058 - Notice of Suspension and Initiation of Debarment Proceedings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-30

    ... proceedings are commencing against him. Dr. Bruno, or any person who has an existing contract with or intends to contract with him to provide or receive services in matters arising out of activities associated...

  14. 43 CFR 3602.49 - When will BLM issue a non-renewable contract?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... conflicting, purpose after mineral materials are removed; (2) The deposit of mineral materials may be... will include this information. (c) If your contract is in existence on December 24, 2001, BLM will...

  15. State of the NASA Aeropropulsion Discipline Input from the Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Reddy, D. R.; Schmidt, George

    2017-01-01

    PROBLEM: Current power turbines are designed for single operating speed, and performance degrades rapidly as power turbine speed decreases. OBJECTIVES: Demonstrate 50 improvement in efficient operational capability using a Variable Speed Power Turbine concept. (Refer to figure lower left, where the goal is to raise efficiency from the current technology line to the green line which represents the AVSPOT VSPT goal.APPROACH: Conduct RD required to advance the technology readiness level of VSPT technology to TRL 4Partner with DoD and leverage DOD AVSPOT contract to share government cost (5050) of contracted efforts to GE and PW for VSPT TRL 45 demonstration.

  16. An Evaluation of Bioregulators/Modulators as Terrorism and Warfare Agents

    DTIC Science & Technology

    2003-07-01

    such as bronchial and vascular tone and muscle contraction . This opens an unprecedented possibility to use toxic substances that could not be...bronchial smooth muscles and also in the intestines and the uterus bradykinin leads to muscle contraction . Bradykinin is also one the most potent...gout. Bradykinin has a powerful influence in stimulating smooth muscle contraction , inducing hypotension, increasing blood flow and permeability of

  17. 7 CFR 1786.155 - Eligible borrower.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... purpose of determining eligibility for prepayment, a default by a power supply borrower from which a distribution borrower purchases wholesale power shall not be considered a default by the distribution borrower... borrower shall be current on all obligations under any wholesale power contract with an RUS financed power...

  18. 7 CFR 1786.155 - Eligible borrower.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... purpose of determining eligibility for prepayment, a default by a power supply borrower from which a distribution borrower purchases wholesale power shall not be considered a default by the distribution borrower... borrower shall be current on all obligations under any wholesale power contract with an RUS financed power...

  19. Contracting out of health services in developing countries.

    PubMed

    McPake, B; Banda, E E

    1994-03-01

    Contracting out is emerging as a common policy issue in a number of developing countries. The theoretical case for contracting out suggests many advantages in combining public finance with private provision. However, practical difficulties such as those of ensuring that competition takes place between potential contractors, that competition leads to efficiency and that contracts and the process of contracting are effectively managed, suggest that such advantages may not always be realized. Most countries are likely only to contemplate restricted contracting of small-scale non-clinical services in the short term. Prerequisites of more extensive models appear to be the development of information systems and human resources to that end. Some urban areas of larger countries may have the existing preconditions for more successful large-scale contracting.

  20. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  1. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.A. Scroppo

    1998-07-01

    This is the Technical Progress Report covering June 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  2. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-31

    This is the Technical Progress Report covering October 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  3. 48 CFR 1419.201 - General policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SMALL BUSINESS PROGRAMS Policies 1419.201 General policy. HCAs, without the power of redelegation, shall... participation of small business and small disadvantaged businesses in contract and subcontract opportunities. Goals for contract awards to minority business enterprises and women-owned businesses shall also be...

  4. 48 CFR 1419.201 - General policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SMALL BUSINESS PROGRAMS Policies 1419.201 General policy. HCAs, without the power of redelegation, shall... participation of small business and small disadvantaged businesses in contract and subcontract opportunities. Goals for contract awards to minority business enterprises and women-owned businesses shall also be...

  5. Muscle contraction: A mechanical perspective.

    PubMed

    Marcucci, L; Truskinovsky, L

    2010-08-01

    In this paper we present a purely mechanical analog of the conventional chemo-mechanical modeling of muscle contraction. We abandon the description of kinetics of the power stroke in terms of jump processes and instead resolve the continuous stochastic evolution on an appropriate energy landscape. In general physical terms, we replace hard spin chemical variables by soft spin variables representing mechanical snap-springs. This allows us to treat the case of small and even disappearing barriers and, more importantly, to incorporate the mechanical representation of the power stroke into the theory of Brownian ratchets. The model provides the simplest non-chemical description for the main stages of the biochemical Lymn-Taylor cycle and may be used as a basis for the artificial micro-mechanical reproduction of the muscle contraction mechanism.

  6. Substantial Fast-Wave Power Flux in the SOL of a Cylindrical Model; Comparison with Coaxial Modes

    NASA Astrophysics Data System (ADS)

    Perkins, R. J.; Bertelli, N.; Hosea, J. C.; Phillips, C. K.; Taylor, G.; Wilson, J. R.

    2015-11-01

    The NSTX high-harmonic fast-wave (HHFW) heating system can lose a significant amount of power along magnetic fields lines in the SOL to the divertor regions under certain conditions. A cylindrical cold-plasma model, with parameters resembling those of NSTX, shows the existence of modes with relatively large RF field amplitudes in the low-density annulus, similar to recent results found with the full-wave simulation AORSA. Here, we compare and contrast these modes against ``coaxial modes,'' modes that resemble TEM modes found in coaxial cables. We also compute the 3D Poynting flux as a function of length along the cylinder for comparison to NSTX. Such work is part of an effort to include the proper edge damping into full-wave codes so that they can reproduce the losses observed in NSTX and predict their importance for ITER. This work was supported by DOE Contract No. DE-AC02-09CH11466.

  7. And deregulation shall lead me to lie down in green pastures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weidinger, G.

    1995-06-01

    This presentation briefly reviews the history of the IPP industry, the current state of competition, and potential opportunities for IPPs in a deregulated environment. Since the beginning of the PURPA created IPP industry, we have experienced many market phases. These began with {open_quotes}beat avoided cost,{close_quotes} followed by {open_quotes}find a need and fill it,{close_quotes} followed by {open_quotes}the bid fest,{close_quotes} to today`s {open_quotes}anything goes.{close_quotes} During this time, market clearing prices have declined from over 80/KwHr to 2-40/KwHr. Today`s partially deregulated electric market includes fierce competition and several new players in the game. Where surplus capacity exists, IPPs must compete with subsidized power.more » Long-term contracts are no longer widely available. Access to markets is constrained by less than open transmission. Even with these challenges, opportunities remain for the IPP supplier. Opportunities for advanced coal-fired power systems will be explored.« less

  8. Resolving Past Liabilities for Future Reduction in Greenhouse Gases; Nuclear Energy and the Outstanding Federal Liability of Spent Nuclear Fuel

    NASA Astrophysics Data System (ADS)

    Donohue, Jay

    This thesis will: (1) examine the current state of nuclear power in the U.S.; (2) provide a comparison of nuclear power to both existing alternative/renewable sources of energy as well as fossil fuels; (3) dissect Standard Contracts created pursuant to the National Waste Policy Act (NWPA), Congress' attempt to find a solution for Spent Nuclear Fuel (SNF), and the designation of Yucca Mountain as a repository; (4) the anticipated failure of Yucca Mountain; (5) explore WIPP as well as attempts to build a facility on Native American land in Utah; (6) examine reprocessing as a solution for SNF used by France and Japan; and, finally, (7) propose a solution to reduce GHG's by developing new nuclear energy plants with financial support from the U.S. government and a solution to build a storage facility for SNF through the sitting of a repository based on a "bottom-up" cooperative federalism approach.

  9. Synthesis of innovative contracting strategies used for routine and preventive maintenance contracts.

    DOT National Transportation Integrated Search

    2010-01-01

    In 2000, as the United States entered a new millennium, the Federal : Highway Administration (FHWA) challenged state highway agencies : (SHAs) to focus on preserving and maintaining rather than expanding : our existing highway system and to ...

  10. Enhancement of muscle and locomotor performance by a series compliance: A mechanistic simulation study

    PubMed Central

    2018-01-01

    The objective was to better understand how a series compliance alters contraction kinetics and power output of muscle to enhance the work done on a load. A mathematical model was created in which a gravitational point load was connected via a linear spring to a muscle (based on the contractile properties of the sartorius of leopard frogs, Rana pipiens). The model explored the effects of load mass, tendon compliance, and delay between onset of contraction and release of the load (catch) on lift height and power output as measures of performance. Series compliance resulted in increased lift height over a relatively narrow range of compliances, and the effect was quite modest without an imposed catch mechanism unless the load was unrealistically small. Peak power of the muscle-tendon complex could be augmented up to four times that produced with a muscle alone, however, lift height was not predicted by peak power. Rather, lift height was improved as a result of the compliance synchronizing the time courses of muscle force and shortening velocity, in particular by stabilizing shortening velocity such that muscle power was sustained rather than rising and immediately falling. With a catch mechanism, enhanced performance resulted largely from energy storage in the compliance during the period of catch, rather than increased time for muscle activation before movement commenced. However, series compliance introduced a trade-off between work done before versus after release of the catch. Thus, the ability of tendons to enhance locomotor performance (i.e. increase the work done by muscle) appears dependent not only on their established role in storing energy and increasing power, but also on their ability to modulate the kinetics of muscle contraction such that power is sustained over more of the contraction, and maximizing the balance of work done before versus after release of a catch. PMID:29370246

  11. Influence of curing mode with a LED unit on polymerization contraction kinetics and degree of conversion of dental resin-based materials.

    PubMed

    Mortier, Eric; Simon, Yorick; Dahoun, Abdelsellam; Gerdolle, David

    2009-01-01

    The purpose of this study was to evaluate the influence of photopolymerization mode with a light emitting diode (LED) lamp on the curing contraction kinetics and degree of conversion of 3 resin-based restorative materials. The curing contraction kinetics of Admira (ADM), Filtek P60 (P60), and Filtek Flow (FLO) were measured by the glass slide method. The materials were exposed to light from a 1,000 mW/cm-(2) power LED lamp (Elipar Freelight 2) in 3 modes: 2 continuous modes of 20 and 40 seconds (C20 and C40), and 1 exponential mode (E20; 5 seconds of exponential power increase followed by 15 seconds of maximum intensity). The degree of conversion (DC) was measured for each of the materials, and each of the modes by Fourier transformed infra-red spectrometry. P60 had the significantly lowest final contraction and FLO the highest among all light exposure modes. The C20 and C40 modes did not produce any difference in contraction or degree of conversion. The E20 mode led to a significant slowing of contraction speed combined with greater final contraction. Use of a LED lamp (1,000 mW/cm2) in continuous mode reduces the exposure time by half for identical curing shrinkage and degree of conversion.

  12. 7 CFR 1717.303 - Requirements of RUS documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.303 Requirements of RUS documents. (a) Pursuant to the terms of the RUS documents each power supply borrower shall... wholesale power contract, the Board of Directors or Board of Trustees of the power supply borrower shall...

  13. 7 CFR 1717.303 - Requirements of RUS documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.303 Requirements of RUS documents. (a) Pursuant to the terms of the RUS documents each power supply borrower shall... wholesale power contract, the Board of Directors or Board of Trustees of the power supply borrower shall...

  14. Back extensor muscle fatigue at submaximal workloads assessed using frequency banding of the electromyographic signal.

    PubMed

    Cardozo, Adalgiso Coscrato; Gonçalves, Mauro; Dolan, Patricia

    2011-12-01

    Changes in the mean or median frequency of the electromyographic (EMG) power spectrum are often used to assess skeletal muscle fatigue. A more global analysis of the spectral changes using frequency banding may provide a more sensitive measure of fatigue than changes in mean or median frequency. So, the aim of the present study was to characterize changes in different power spectrum frequency bands and compare these with changes in median frequency. Twenty male subjects performed isometric contractions of the back muscles in an isometric dynamometer at 30%, 40%, 50% and 60% of maximum voluntary contraction. During each contraction, surface EMG signals were recorded from the right and left longissimus thoracis muscles, and endurance time was measured. The EMG power spectra were divided into four frequency bands (20-50 Hz; 50-80 Hz; 80-110 Hz; 110-140 Hz) and changes in power in each band with fatigue were compared with changes in median frequency. The percentage changes in 20-50 Hz band were greater than in all other and the rate of change in power, indicated by the slope, was also greatest in 20-50 Hz band. Also, 20-50 Hz band had a greater change in power than the median frequency. Power in the low frequency part of the EMG power spectrum increases with fatigue in a load-dependent manner. The rate of change in low frequency power may be a useful indicator of fatigue rate or "fatigability" in the back muscles. Also, changes in low frequency power are more evident than changes in the median frequency. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Mechanical stress-controlled tunable active frequency-selective surface

    NASA Astrophysics Data System (ADS)

    Huang, Bo-Cin; Hong, Jian-Wei; Lo, Cheng-Yao

    2017-01-01

    This study proposes a tunable active frequency-selective surface (AFSS) realized by mechanically expanding or contracting a split-ring resonator (SRR) array. The proposed AFSS transfers mechanical stress from its elastic substrate to the top of the SRR, thereby achieving electromagnetic (EM) modulation without the need for an additional external power supply, meeting the requirements for the target application: the invisibility cloak. The operating mechanism of the proposed AFSS differs from those of other AFSSs, supporting modulations in arbitrary frequencies in the target range. The proposed stress-controlled or strain-induced EM modulation proves the existence of an identical and linear relationship between the strain gradient and the frequency shift, implying its suitability for other EM modulation ranges and applications.

  16. An Analysis of When Officers Should Enter the Army Contracting Career Field

    DTIC Science & Technology

    2016-06-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT AN ANALYSIS OF WHEN OFFICERS SHOULD ENTER THE ARMY...TYPE AND DATES COVERED MBA professional report 4. TITLE AND SUBTITLE AN ANALYSIS OF WHEN OFFICERS SHOULD ENTER THE ARMY CONTRACTING CAREER FIELD...courses of action provide an alternative to the existing professional timeline in order to allow officers to serve in contracting positions earlier

  17. The series-elastic shock absorber: tendons attenuate muscle power during eccentric actions.

    PubMed

    Roberts, Thomas J; Azizi, Emanuel

    2010-08-01

    Elastic tendons can act as muscle power amplifiers or energy-conserving springs during locomotion. We used an in situ muscle-tendon preparation to examine the mechanical function of tendons during lengthening contractions, when muscles absorb energy. Force, length, and power were measured in the lateral gastrocnemius muscle of wild turkeys. Sonomicrometry was used to measure muscle fascicle length independently from muscle-tendon unit (MTU) length, as measured by a muscle lever system (servomotor). A series of ramp stretches of varying velocities was applied to the MTU in fully activated muscles. Fascicle length changes were decoupled from length changes imposed on the MTU by the servomotor. Under most conditions, muscle fascicles shortened on average, while the MTU lengthened. Energy input to the MTU during the fastest lengthenings was -54.4 J/kg, while estimated work input to the muscle fascicles during this period was only -11.24 J/kg. This discrepancy indicates that energy was first absorbed by elastic elements, then released to do work on muscle fascicles after the lengthening phase of the contraction. The temporary storage of energy by elastic elements also resulted in a significant attenuation of power input to the muscle fascicles. At the fastest lengthening rates, peak instantaneous power input to the MTU reached -2,143.9 W/kg, while peak power input to the fascicles was only -557.6 W/kg. These results demonstrate that tendons may act as mechanical buffers by limiting peak muscle forces, lengthening rates, and power inputs during energy-absorbing contractions.

  18. Status of NASA's Advanced Radioisotope Power Conversion Technology Research and Development

    NASA Technical Reports Server (NTRS)

    Wong, Wayne A.; Anderson, David J.; Tuttle, Karen L.; Tew, Roy C.

    2006-01-01

    NASA s Advanced Radioisotope Power Systems (RPS) development program is funding the advancement of next generation power conversion technologies that will enable future missions that have requirements that can not be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power Systems (RPS). Requirements of advanced radioisotope power systems include high efficiency and high specific power (watts/kilogram) in order to meet mission requirements with less radioisotope fuel and lower mass. Other Advanced RPS development goals include long-life, reliability, and scalability so that these systems can meet requirements for a variety of future space applications including continual operation surface missions, outer-planetary missions, and solar probe. This paper provides an update on the Radioisotope Power Conversion Technology Project which awarded ten Phase I contracts for research and development of a variety of power conversion technologies consisting of Brayton, Stirling, thermoelectrics, and thermophotovoltaics. Three of the contracts continue during the current Phase II in the areas of thermoelectric and Stirling power conversion. The accomplishments to date of the contractors, project plans, and status will be summarized.

  19. 78 FR 21171 - International Mail Product

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-57; Order No. 1690] International Mail Product... have the Agreement included within the existing IBRS Competitive Contract 3 product on grounds of... Contract 3 product in Docket No. CP2012-18. Id. at 3. [[Page 21172

  20. 48 CFR 227.7105-3 - Acquisition of modified existing works.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Technical Data 227.7105-3 Acquisition of modified existing works. Use the clause at 252.227-7020, Rights in Special Works, in solicitations and contracts for modified existing works in lieu of the clause at 252.227-7021, Rights in Data—Existing Works. ...

  1. Advanced Low-Noise Research Fan Stage Design

    NASA Technical Reports Server (NTRS)

    Neubert, Robert; Bock, Larry; Malmborg, Eric; Owen-Peer, William

    1997-01-01

    This report describes the design of the Advanced Low-Noise Research Fan stage. The fan is a variable pitch design, which is designed at the cruise pitch condition. Relative to the cruise setting, the blade is closed at takeoff and opened for reverse thrust operation. The fan stage is a split flow design with fan exit guide vanes (FEGVs) and core stators. The fan stage design is combined with a nacelle and engine core duct to form a powered fan/nacelle subscale model. This model is intended for use in combined aerodynamic, acoustic, and structural testing in a wind tunnel. The fan has an outer diameter of 22 in. and a hub-to-tip of 0.426 in., which allows the use of existing NASA fan and cowl force balance and rig drive systems. The design parameters were selected to permit valid acoustic and aerodynamic comparisons with the Pratt & Whitney (P&W) 17- and 22-in. rigs previously tested under NASA contract. The fan stage design is described in detail. The results of the design axisymmetric and Navier-Stokes aerodynamic analysis are presented at the critical design conditions. The structural analysis of the fan rotor and attachment is included. The blade and attachment are predicted to have adequate low-cycle fatigue life and an acceptable operating range without resonant stress or flutter. The stage was acoustically designed with airfoil counts in the FEGV and core stator to minimize noise. A fan/FEGV tone analysis developed separately under NASA contract was used to determine the optimum airfoil counts. The fan stage was matched to the existing nacelle, designed under the previous P&W low-noise contract, to form a fan/nacelle model for wind tunnel testing. It is an axisymmetric nacelle for convenience in testing and analysis. Previous testing confirmed that the nacelle performed as required at various aircraft operating conditions.

  2. An Assessment of Private General Practitioners Contracting for Public Health Services Delivery in O.R. Tambo District, South Africa

    PubMed Central

    Hongoro, Charles; Funani, I Itumeleng N.; Chitha, Wezile; Godlimpi, Lizo

    2015-01-01

    Low- and middle-income countries are striving towards universal health coverage in a variety of ways. Achieving this goal requires the participation of both public and the private sector providers. The study sought to assess existing capacity for independent general practitioner contracting in primary care, the reasons for the low uptake of government national contract and the expectations of general practitioners of such contractual arrangements. This was a case study conducted in a rural district of South Africa. The study employed both quantitative and qualitative data collection methods. Data were collected using a general practitioner and practice profiling tool, and a structured questionnaire. A total of 42 general practitioners were interviewed and their practices profiled. Contrary to observed low uptake of the national general practitioner contract, 90% of private doctors who had not yet subscribed to it were actually interested in it. Substantial evidence indicated that private doctors had the capacity to deliver quality care to public patients. However, low uptake of national contarct related mostly to lack of effective communication and consultation between them and national government which created mistrust and apprehension amongst local private doctors. Paradoxically, these general practitioners expressed satisfaction with other existing state contracts. An analysis of the national contract showed that there were likely to benefit more from it given the relatively higher payment rates and the guaranteed nature of this income. Proposed key requisites to enhanced uptake of the national contract related to the type of the contract, payment arrangements and flexibility of the work regime, and prospects for continuous training and clinical improvements. Low uptake of the national General Practitioner contract was due to variety of factors related to lack of understanding of contract details. Such misunderstandings between potential contracting parties created mistrust and apprehension, which are fundamental antitheses of any effective contractual arrangement. The idea of a one-size-fits-all contract was probably inappropriate. PMID:28299145

  3. 48 CFR 1450.104 - Residual powers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Residual powers. 1450.104 Section 1450.104 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.104 Residual powers. ...

  4. 48 CFR 1450.104 - Residual powers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Residual powers. 1450.104 Section 1450.104 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.104 Residual powers. ...

  5. Managing the Financial Risks of Water Scarcity

    NASA Astrophysics Data System (ADS)

    Characklis, Greg; Foster, Ben; Kern, Jordan; Meyer, Eliot; Zeff, Harrison

    2015-04-01

    Environmental uncertainty poses a growing number of financial risks to society, with droughts, floods, extreme temperatures and violent storms imposing costs that approach 500 billion per year. While structural forms of mitigation (i.e. levees, dams) will certainly play a role in limiting financial impacts, these are large investments whose full value is only rarely realized. Furthermore, the value of such long-lived measures becomes increasingly uncertain in a changing climate, raising the issue of whether they will be effective 20-30 years hence. Financial instruments, such as index insurance, can provide increased flexibility by providing compensation for losses only when they occur, and limited contract periods allow terms to be periodically rewritten in response to changing conditions. Financial instruments can also be effectively combined with other economic tools and infrastructure to create integrated solutions in which infrastructure mitigates losses from moderate events, while financial products compensate for more rare, but extreme, events. There is a long history of environmentally-related insurance and hedging instruments, but to date the actuarial analyses that underlie contract structure and pricing have been based on straightforward observations, such as cumulative rainfall. More recently, simple correlations between two time series have been used to develop index-based contracts. Links between temperature and electricity demand, for example, provide a basis for contracts that are used to limit the financial exposure of power generators to low revenues during unseasonably warm winters or cool summers. Unfortunately, few environmental risks can be so quickly and easily linked to a financial impact. However, with a more advanced understanding of the environmental systems that give rise to financial losses, opportunities exist to develop innovative contracts for a range of new applications. Recent research describes the characterization and mitigation of financial losses experienced by such entities as water utilities, hydropower producers and inland shipping firms as a result of water scarcity, all of which suggest a growing role for financial instruments in managing environmental risk.

  6. Collective Bargaining and the Principal.

    ERIC Educational Resources Information Center

    Johnson, Susan Moore

    Collective bargaining contracts with teachers unions have reduced principals' autonomy but have still left them opportunities for effective administration of their schools. Interviews with 289 educators in six diverse school districts across the country show that contracts have limited principals' powers both from above, by centralizing labor…

  7. 18 CFR 1316.8 - Employee protected activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Employee protected... Conditions and Certifications § 1316.8 Employee protected activities. When so indicated in TVA contract... Protected Activities (Applicable to contracts for goods or services delivered to nuclear facilities or...

  8. 18 CFR 1316.8 - Employee protected activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Employee protected... Conditions and Certifications § 1316.8 Employee protected activities. When so indicated in TVA contract... Protected Activities (Applicable to contracts for goods or services delivered to nuclear facilities or...

  9. 18 CFR 1316.8 - Employee protected activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Employee protected... Conditions and Certifications § 1316.8 Employee protected activities. When so indicated in TVA contract... Protected Activities (Applicable to contracts for goods or services delivered to nuclear facilities or...

  10. 18 CFR 1316.8 - Employee protected activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Employee protected... Conditions and Certifications § 1316.8 Employee protected activities. When so indicated in TVA contract... Protected Activities (Applicable to contracts for goods or services delivered to nuclear facilities or...

  11. 18 CFR 1316.8 - Employee protected activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Employee protected... Conditions and Certifications § 1316.8 Employee protected activities. When so indicated in TVA contract... Protected Activities (Applicable to contracts for goods or services delivered to nuclear facilities or...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, R.A.; Hines, T.L.

    Utilization of remote gas resources in developing countries continues to offer challenges and opportunities to producers and contractors. The Aguaytia Gas and Power Project is an example where perseverance and creativity resulted in successful utilization of natural gas resources in the Ucayali Region of Central Peru, a country which previously had no natural gas infrastructure. The resource for the project was first discovered by Mobil in 1961, and remained undeveloped for over thirty years due to lack of infrastructure and markets. Maple Gas won a competitively bid contract to develop the Aguaytia gas reserves in March of 1993. The challengesmore » facing Maple Gas were to develop downstream markets for the gas, execute contracts with Perupetro S.A. and other Peruvian government entities, raise financing for the project, and solicit and execute engineering procurement and construction (EPC) contracts for the execution of the project. The key to development of the downstream markets was the decision to generate electric power and transmit the power over the Andes to the main electrical grid along the coast of Peru. Supplemental revenue could be generated by gas sales to a small regional power plant and extraction of LPG and natural gasoline for consumption in the Peruvian market. Three separate lump sum contracts were awarded to Asea Brown Boveri (ABB) companies for the gas project, power project and transmission project. Each project presented its unique challenges, but the commonalities were the accelerated schedule, high rainfall in a prolonged wet season and severe logistics due to lack of infrastructure in the remote region. This presentation focuses on how the gas plant contractor, ABB Randall, working in harmony with the developer, Maple Gas, tackled the challenges to monetize a remote gas resource.« less

  13. Multi-KW dc distribution system technology research study

    NASA Technical Reports Server (NTRS)

    Dawson, S. G.

    1978-01-01

    The Multi-KW DC Distribution System Technology Research Study is the third phase of the NASA/MSFC study program. The purpose of this contract was to complete the design of the integrated technology test facility, provide test planning, support test operations and evaluate test results. The subjet of this study is a continuation of this contract. The purpose of this continuation is to study and analyze high voltage system safety, to determine optimum voltage levels versus power, to identify power distribution system components which require development for higher voltage systems and finally to determine what modifications must be made to the Power Distribution System Simulator (PDSS) to demonstrate 300 Vdc distribution capability.

  14. 77 FR 71458 - New International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-20; Order No. 1553] New International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a...\\ Id. at 5-7. \\3\\ Differences include numerous revisions to existing Articles and five new Articles. Id...

  15. 77 FR 66052 - Program Access Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... contracts involving cable-affiliated programming; and amendments to its rules to ensure that buying groups utilized by small and medium-sized multichannel video programming distributors (``MVPDs'') can avail...-delivered) is entitled to a standstill of an existing programming contract during the pendency of a...

  16. Comparing electro- and mechano-myographic muscle activation patterns in self-paced pediatric gait.

    PubMed

    Plewa, Katherine; Samadani, Ali; Chau, Tom

    2017-10-01

    Electromyography (EMG) is the standard modality for measuring muscle activity. However, the convenience and availability of low-cost accelerometer-based wearables makes mechanomyography (MMG) an increasingly attractive alternative modality for clinical applications. Literature to date has demonstrated a strong association between EMG and MMG temporal alignment in isometric and isokinetic contractions. However, the EMG-MMG relationship has not been studied in gait. In this study, the concurrence of EMG- and MMG-detected contractions in the tibialis anterior, lateral gastrocnemius, vastus lateralis, and biceps femoris muscles were investigated in children during self-paced gait. Furthermore, the distribution of signal power over the gait cycle was statistically compared between EMG-MMG modalities. With EMG as the reference, muscular contractions were detected based on MMG with balanced accuracies between 88 and 94% for all muscles except the gastrocnemius. MMG signal power differed from that of EMG during certain phases of the gait cycle in all muscles except the biceps femoris. These timing and power distribution differences between the two modalities may in part be related to muscle fascicle length changes that are unique to muscle motion during gait. Our findings suggest that the relationship between EMG and MMG appears to be more complex during gait than in isometric and isokinetic contractions. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Comparison of Environmental Remediation Contracting Approaches between the Department of Defense and the Private Sector

    DTIC Science & Technology

    2001-12-01

    private sector contracts for environmental remediation and apply any applicable best practices to the Department of Defense contracting system. Key findings of this study are: (1) there is no readily available process from either the commercial sector or the Department of Defense that will suffice as a template for all environmental remediation efforts, (2) the Department of Defense has no centralized repository of environmental remediation contracting knowledge, (3) Legislative and regulatory hurdles exist which impede assimilation of new initiatives in the remediation of

  18. The Universal R-Matrix for the Jordanian Deformation of sl(2), and the Contracted Forms of so(4)

    NASA Astrophysics Data System (ADS)

    Shariati, A.; Aghamohammadi, A.; Khorrami, M.

    We introduce a universal R-matrix for the Jordanian deformation of U(sl(2)). Using Uh(so(4))=Uh(sl(2)) ⊕ U-h(sl(2)), we obtain the universal R-matrix for Uh(so(4)). Applying the graded contractions on the universal R-matrix of Uh(so(4)), we show that there exist three distinct R-matrices for all the contracted algebras. It is shown that Uh(sl(2)), Uh(so(4)), and all of these contracted algebras are triangular.

  19. Shared Savings Contracting for Reducing Energy Costs of Defense Facilities.

    DTIC Science & Technology

    1983-01-01

    also needs additional -4 operation and maintenance help, especially if new equipment is involved. New equipment with sophisticated control technology...process may take time to develop and may be " difficult to integrate with existing financial control practices. For example, the regulations and...will seek a change order on the contract. The potential for such changes, if not controlled , seriously undermines the value of these contracts. DoD

  20. Review of Department Identified Contracts and Grants for Public Relations Services. Final Inspection Report. ED-OIG/I13-F0012

    ERIC Educational Resources Information Center

    US Department of Education, 2005

    2005-01-01

    The objective of this inspection was to review the materials produced under 20 contracts and 15 grants issued by the Department of Education (Department) to determine whether any of the contracts and grants resulted in covert propaganda. It has been concluded that none of the grants resulted in covert propaganda under the existing guidance of the…

  1. Instrument to Measure Psychological Contract Violation in Pharmacy Students

    PubMed Central

    Wilkin, Noel E.; Bentley, John P.; Bouldin, Alicia S.; Wilson, Marvin C.; Holmes, Erin R.

    2010-01-01

    Objectives To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. Design A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Results Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. Conclusion The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations. PMID:21045949

  2. 76 FR 13178 - Wabash Valley Power Association, Inc.; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... (Formula Rate Tariff) and the related Wholesale Power Supply Contract between WVPA and Northeastern Rural... Power Association, Inc.; Notice of Petition for Declaratory Order Take notice that on March 3, 2011...), Wabash Valley Power Association, Inc. (WVPA) filed a Petition Declaratory Order that finds (i) the...

  3. Generation of Electrical Power from Stimulated Muscle Contractions Evaluated

    NASA Technical Reports Server (NTRS)

    Lewandowski, Beth; Kilgore, Kevin; Ercegovic, David B.

    2004-01-01

    This project is a collaborative effort between NASA Glenn Research Center's Revolutionary Aeropropulsion Concepts (RAC) Project, part of the NASA Aerospace Propulsion and Power Program of the Aerospace Technology Enterprise, and Case Western Reserve University's Cleveland Functional Electrical Stimulation (FES) Center. The RAC Project foresees implantable power requirements for future applications such as organically based sensor platforms and robotics that can interface with the human senses. One of the goals of the FES Center is to develop a totally implantable neural prosthesis. This goal is based on feedback from patients who would prefer a system with an internal power source over the currently used system with an external power source. The conversion system under investigation would transform the energy produced from a stimulated muscle contraction into electrical energy. We hypothesize that the output power of the system will be greater than the input power necessary to initiate, sustain, and control the electrical conversion system because of the stored potential energy of the muscle. If the system can be made biocompatible, durable, and with the potential for sustained use, then the biological power source will be a viable solution.

  4. 25 CFR 175.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... marketing of electric power or energy. Electric service means the delivery of electric energy or power by... relationships with the utility. Special contract means a written agreement between the utility and a customer...

  5. Phototherapy for Improvement of Performance and Exercise Recovery: Comparison of 3 Commercially Available Devices.

    PubMed

    De Marchi, Thiago; Schmitt, Vinicius Mazzochi; Danúbia da Silva Fabro, Carla; da Silva, Larissa Lopes; Sene, Juliane; Tairova, Olga; Salvador, Mirian

    2017-05-01

      Recent studies suggest the prophylactic use of low-powered laser/light has ergogenic effects on athletic performance and postactivity recovery. Manufacturers of high-powered lasers/light devices claim that these can produce the same clinical benefits with increased power and decreased irradiation time; however, research with high-powered lasers is lacking.   To evaluate the magnitude of observed phototherapeutic effects with 3 commercially available devices.   Randomized double-blind placebo-controlled study.   Laboratory.   Forty healthy untrained male participants.   Participants were randomized into 4 groups: placebo, high-powered continuous laser/light, low-powered continuous laser/light, or low-powered pulsed laser/light (comprising both lasers and light-emitting diodes). A single dose of 180 J or placebo was applied to the quadriceps.   Maximum voluntary contraction, delayed-onset muscle soreness (DOMS), and creatine kinase (CK) activity from baseline to 96 hours after the eccentric exercise protocol.   Maximum voluntary contraction was maintained in the low-powered pulsed laser/light group compared with placebo and high-powered continuous laser/light groups in all time points (P < .05). Low-powered pulsed laser/light demonstrated less DOMS than all groups at all time points (P < .05). High-powered continuous laser/light did not demonstrate any positive effects on maximum voluntary contraction, CK activity, or DOMS compared with any group at any time point. Creatine kinase activity was decreased in low-powered pulsed laser/light compared with placebo (P < .05) and high-powered continuous laser/light (P < .05) at all time points. High-powered continuous laser/light resulted in increased CK activity compared with placebo from 1 to 24 hours (P < .05).   Low-powered pulsed laser/light demonstrated better results than either low-powered continuous laser/light or high-powered continuous laser/light in all outcome measures when compared with placebo. The increase in CK activity using the high-powered continuous laser/light compared with placebo warrants further research to investigate its effect on other factors related to muscle damage.

  6. 12 CFR 367.5 - Exclusions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... also prohibited from conducting business with FDIC as agents or representatives of other contractors... bars to contracting are shown to exist, the existence of a cause for exclusion does not necessarily...

  7. Large-Scale Paraphrasing for Natural Language Understanding

    DTIC Science & Technology

    2018-04-01

    to manufacture , use, or sell any patented invention that may relate to them. This report is the result of contracted fundamental research deemed...station contaminated local fish populations Atomic power generation in Springfield polluted indigenous seafood stocks Radioactive power generation...from PPDB. Springfield’s nuclear power plant contaminated local fish populations nuclear power station nuclear plant power plant fish stocks

  8. 48 CFR 552.236-71 - Authorities and Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., responsibilities, authorities and functions vested in him by the contract documents, except that he shall have the right to designate authorized representatives to act for him. Wherever any provision in this contract... additional power and authority to act for him or designate additional representatives, specifying the extent...

  9. 48 CFR 16.203-2 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract with economic price adjustment may be used when (i) there is serious doubt concerning the stability of market or labor conditions that will exist during an extended period of contract performance... limited to contingencies beyond the contractor's control. For use of economic price adjustment in sealed...

  10. 48 CFR 32.304-2 - Certificate of eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) There is no practicable alternate source for the acquisition without prejudice to the national defense... contracting officer shall consider the following factors in determining if a practicable alternate source exists: (1) Prejudice to the national defense, because reletting of a contract with another source would...

  11. Contracting for Asbestos Abatement: What You Need to Know.

    ERIC Educational Resources Information Center

    Bittle, Edgar H.; McAllister, Jane B.

    1990-01-01

    School districts are required to determine if asbestos-containing materials exist at school facilities and design and implement asbestos abatement. Reviews how to select a contractor, draft the contract, and ensure its proper implementation by complying with the law and avoiding liability. (MLF)

  12. 48 CFR 2804.901 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATTERS Information Reporting to the Internal Revenue Service 2804.901 Definitions. Classified contract, as used in this subpart, means a contract such that the fact of its existence of its subject matter... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definitions. 2804.901...

  13. 48 CFR 2804.901 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MATTERS Information Reporting to the Internal Revenue Service 2804.901 Definitions. Classified contract, as used in this subpart, means a contract such that the fact of its existence of its subject matter... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Definitions. 2804.901...

  14. 48 CFR 2804.901 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATTERS Information Reporting to the Internal Revenue Service 2804.901 Definitions. Classified contract, as used in this subpart, means a contract such that the fact of its existence of its subject matter... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Definitions. 2804.901...

  15. 48 CFR 2804.901 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATTERS Information Reporting to the Internal Revenue Service 2804.901 Definitions. Classified contract, as used in this subpart, means a contract such that the fact of its existence of its subject matter... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Definitions. 2804.901...

  16. 48 CFR 2804.901 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATTERS Information Reporting to the Internal Revenue Service 2804.901 Definitions. Classified contract, as used in this subpart, means a contract such that the fact of its existence of its subject matter... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Definitions. 2804.901...

  17. 41 CFR 105-8.160 - Communications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Communications. 105-8.160 Section 105-8.160 Public Contracts and Property Management Federal Property Management Regulations... vision or hearing, can obtain information as to the existence and location of accessible services...

  18. An Investigation of Leadership Styles and Psychological Contracts

    ERIC Educational Resources Information Center

    Chu, Hui-Chin; Fu, Chi-Jung

    2005-01-01

    This study was conducted to determine whether a statistically significant relationship exists between the leadership styles of managers and employee psychological contracts, as perceived by the employees. The findings indicated that the employees' perception of leadership style significantly affected satisfaction levels of employee psychological…

  19. Study on the contract characteristics of Internet architecture

    NASA Astrophysics Data System (ADS)

    Fu, Chuan; Zhang, Guoqing; Yang, Jing; Liu, Xiaona

    2011-11-01

    The importance of Internet architecture goes beyond the technical aspects. The architecture of Internet has a profound influence on the Internet-based economy in term of how the profits are shared by different market participants (Internet Server Provider, Internet Content Provider), since it is the physical foundation upon which the profit-sharing contracts are derived. In order to facilitate the continuing growth of the Internet, it is necessary to systematically study factors that curtail the Internet-based economy including the existing Internet architecture. In this paper, we used transaction cost economics and contract economics as new tools to analyse the contracts derived from the current Internet architecture. This study sheds light on how the macro characteristics of Internet architecture effect the microeconomical decisions of market participants. Based on the existing Internet architecture, we discuss the possibility of promoting Internet-based economy by encouraging user to connect their private stub network to the Internet and giving the user more right of self-governing.

  20. Resolving the problem of compliance with the ever increasing and changing regulations

    NASA Astrophysics Data System (ADS)

    Leigh, Harley

    1992-01-01

    The most common problem identified at several U.S. Department of Energy (DOE) sites is regulatory compliance. Simply, the project viability depends on identifying regulatory requirements at the beginning of a specific project to avoid possible delays and cost overruns. The Radioisotope Power Systems Facility (RPSF) is using the Regulatory Compliance System (RCS) to deal with the problem that well over 1000 regulatory documents had to be reviewed for possible compliance requirements applicable to the facility. This overwhelming number of possible documents is not atypical of all DOE facilities thus far reviewed using the RCS system. The RCS was developed to provide control and tracking of all the regulatory and institutional requirements on a given project. WASTREN, Inc., developed the RCS through various DOE contracts and continues to enhance and update the system for existing and new contracts. The RCS provides the information to allow the technical expert to assimilate and manage accurate resource information, compile the necessary checklists, and document that the project or facility fulfills all of the appropriate regulatory requirements. The RCS provides on-line information, including status throughout the project life, thereby allowing more intelligent and proactive decision making. Also, consistency and traceability are provided for regulatory compliance documentation.

  1. Micro-focusing System of the Taiwan Contract Beamline BL12XU at SPring-8 for IXS Experiments under High Pressure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, C.-Y.; Cai, Y.-Q.; Chung, S.-C.

    The Taiwan Contract Beamline BL12XU at SPring-8 is designed for inelastic X-ray scattering (IXS) experiments. DCS is a powerful technique capable of probing the dynamic behavior and electronic structure of materials under high pressure. The state-of-the-arts technology to generate static high pressure up to mega-bar range uses diamond anvil cells (DAC). The allowed volume of the sample in DAC scales inversely with the pressure and is limited to the order of 1 x 10-3 mm3. In order to utilize such a device to explore the interesting phenomena under high pressure, we have designed a micro-focusing system using a set ofmore » KB mirrors, which is compatible with the existing optical system of BL12XU. Realistic ray-tracing results indicate that the system can achieve a focus of 10 {mu}m x 5.3 {mu}m(H x V) with a total efficiency of about 86%. The improved focus is expected to substantially enhance the experimental capability of BL12XU for high-pressure research.« less

  2. Engineering development program of a closed aluminum-oxygen semi-cell system for an unmanned underwater vehicle: An update

    NASA Astrophysics Data System (ADS)

    Gregg, Dane W.; Hall, Susan E.

    1995-04-01

    Most emerging unmanned undersea vehicle (UUV) missions require significantly longer range and endurance than is achievable with existing battery technology. The Aluminum-Oxygen (Al-O2) semi-cell is a candidate technology capable of providing a significant improvement in endurance compared to the silver-zinc battery technology currently used in UUVs and compares favorably to other proposed UUV power systems not only in performance, but also in safety and logistics. An Al-O2 semi-cell system is under development by Loral Defense Systems-Akron (Loral) for the ARPA/Navy 44 in. diameter UUV test vehicle. The power plant consists of a cell stack, gas management, oxygen storage, electrolyte management, coolant and controller subsystems, designed to replace the existing silver-zinc battery and meet existing weight, volume, electrical and thermal requirements, therefore minimizing modifications to the UUV. A detailed system design is complete. A component and material endurance test to evaluate compatibility and reliability of various material arid components is complete. Sub scale (Short stack) system testing is completed. A full-scale demonstration unit is now under construction in the second half of 1995. The full scale demonstration test will simulate environmental conditions of the operational system. This paper summarizes the results of the extensive short stack and endurance test programs, describes the plan for full-scale testing, and concludes with a brief discussions of future directions for this technology. This program is sponsored by ARPA Maritime Systems Technology Office under NASA contract NAS3-26715.

  3. Essays on Mathematical Optimization for Residential Demand Response in the Energy Sector

    NASA Astrophysics Data System (ADS)

    Palaparambil Dinesh, Lakshmi

    In the electric utility industry, it could be challenging to adjust supply to match demand due to large generator ramp up times, high generation costs and insufficient in-house generation capacity. Demand response (DR) is a technique for adjusting the demand for electric power instead of the supply. Direct Load Control (DLC) is one of the ways to implement DR. DLC program participants sign up for power interruption contracts and are given financial incentives for curtailing electricity usage during peak demand time periods. This dissertation studies a DLC program for residential air conditioners using mathematical optimization models. First, we develop a model that determines what contract parameters to use in designing contracts between the provider and residential customers, when to turn which power unit on or off and how much power to cut during peak demand hours. The model uses information on customer preferences for choice of contract parameters such as DLC financial incentives and energy usage curtailment. In numerical experiments, the proposed model leads to projected cost savings of the order of 20%, compared to a current benchmark model used in practice. We also quantify the impact of factors leading to cost savings and study characteristics of customers picked by different contracts. Second, we study a DLC program in a macro economic environment using a Computable General Equilibrium (CGE) model. A CGE model is used to study the impact of external factors such as policy and technology changes on different economic sectors. Here we differentiate customers based on their preference for DLC programs by using different values for price elasticity of demand for electricity commodity. Consequently, DLC program customers could substitute demand for electricity commodity with other commodities such as transportation sector. Price elasticity of demand is calculated using a novel methodology that incorporates customer preferences for DLC contracts from the first model. The calculation of elasticity based on our methodology is useful since the prices of commodities are not only determined by aggregate demand and supply but also by customers' relative preferences for commodities. In addition to this we quantify the indirect substitution and rebound effects on sectoral activity levels, incomes and prices based on customer differences, when DLC is implemented.

  4. Death without dignity for commercial surrogacy: the case of Baby M.

    PubMed

    Annas, G J

    1988-01-01

    The New Jersey Supreme Court's In re Baby M ruling is applauded for remedying the flawed opinion of the lower court by invalidating surrogate contracts, applying existing law to determine custody, and restoring the natural mother's parental rights. Portions of the decision highlighted are the court's rejection of the label "surrogate mother" and the claim that surrogacy promotes family building. The author analyzes the surrogacy contract's violation of existing adoption laws, the constitutional issues raised by the contract, the court's controversial ruling on custody, and responses to the opinion by commercial baby brokers. He concludes that legislation must be enacted now to prevent "full surrogacy," in which in vitro fertilization and embryo transfer render the gestational mother an incubator with no rights or interests in the child.

  5. The series-elastic shock absorber: tendons attenuate muscle power during eccentric actions

    PubMed Central

    Azizi, Emanuel

    2010-01-01

    Elastic tendons can act as muscle power amplifiers or energy-conserving springs during locomotion. We used an in situ muscle-tendon preparation to examine the mechanical function of tendons during lengthening contractions, when muscles absorb energy. Force, length, and power were measured in the lateral gastrocnemius muscle of wild turkeys. Sonomicrometry was used to measure muscle fascicle length independently from muscle-tendon unit (MTU) length, as measured by a muscle lever system (servomotor). A series of ramp stretches of varying velocities was applied to the MTU in fully activated muscles. Fascicle length changes were decoupled from length changes imposed on the MTU by the servomotor. Under most conditions, muscle fascicles shortened on average, while the MTU lengthened. Energy input to the MTU during the fastest lengthenings was −54.4 J/kg, while estimated work input to the muscle fascicles during this period was only −11.24 J/kg. This discrepancy indicates that energy was first absorbed by elastic elements, then released to do work on muscle fascicles after the lengthening phase of the contraction. The temporary storage of energy by elastic elements also resulted in a significant attenuation of power input to the muscle fascicles. At the fastest lengthening rates, peak instantaneous power input to the MTU reached −2,143.9 W/kg, while peak power input to the fascicles was only −557.6 W/kg. These results demonstrate that tendons may act as mechanical buffers by limiting peak muscle forces, lengthening rates, and power inputs during energy-absorbing contractions. PMID:20507964

  6. Contingency contracting with school problems

    PubMed Central

    Cantrell, Robert P.; Cantrell, Mary Lynn; Huddleston, Clifton M.; Wooldridge, Ralph L.

    1969-01-01

    Contingency contracting procedures used in managing problems with school-age children involved analyzing teacher and/or parental reports of behavior problem situations, isolating the most probable contingencies then in effect, the range of reinforcers presently available, and the ways in which they were obtained. The authors prepared written contracts delineating remediative changes in reinforcement contingencies. These contracts specified ways in which the child could obtain existing individualized reinforcers contingent upon approximations to desired appropriate behaviors chosen as incompatible with the referral problem behaviors. Contract procedures were administered by the natural contingency managers, parents and/or teachers, who kept daily records of contracted behaviors and reinforcers. These records were sent to the authors and provided feedback on the progress of the case. Initial results of this procedure have been sufficiently encouraging to warrant recommending an experimental analysis of contingency contracting as a clinical method. PMID:16795222

  7. Hawaii 50 m Wind Power Class

    Science.gov Websites

    Power Class Geospatial_Data_Presentation_Form: vector digital data Other_Citation_Details: The wind weather data under contract to Wind Powering America/NREL. This map has been validated with available surface data by NREL and wind energy meteorological consultants. Description: Abstract: Annual average

  8. Project Management and Systems Engineering Guide. Second Edition

    DTIC Science & Technology

    1989-09-30

    depend on the type of requirement. In general, opera- tional requirements will fall into one of the following categories : 1. Replacement of an existing...Warranty service and maintenance contracts also fall into this support category . The planning for phase-in type support must be accomplished during the...fixed-price incentive (FPI). The second general category of contracts is cost reimbursement. Under a cost- type contract, the product is not paid for on

  9. 48 CFR 27.405-2 - Existing works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Existing works. 27.405-2... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-2 Existing works. The clause at 52.227-18, Rights in Data—Existing Works, is for use in contracts exclusively for the acquisition...

  10. 48 CFR 27.405-2 - Existing works.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Existing works. 27.405-2... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-2 Existing works. The clause at 52.227-18, Rights in Data—Existing Works, is for use in contracts exclusively for the acquisition...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    A South Korean consortium won the contract to build and operate four nuclear power plants in Abu Dhabi valued at $20.4 billion. The deal was significant since it is the first major nuclear contract of its kind awarded in the rapidly growing Persian Gulf region, and signals the rise of Korea as an exporter of nuclear know-how.

  12. In the aftermath of PURPA: The future of the biomass energy industry in Maine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, S.J.; Connors, J.F.

    During the 1980`s the biomass power industry in Maine grew to nearly 500 MW of installed capacity in 21 cogeneration and stand alone plants. By 1992 these plants consumed four million tons of woody fuels annually, while providing 25% of the states` electricity supply. Moreover, this new industry supported over 2500 jobs throughout rural Maine, generated substantial local property taxes and provided a critically need management option for forest management and mill waste disposal. All of this capacity was developed by non-utility generators as Qualifying Facilities (QF) under PURPA rules. Most power contracts were fixed price, must take agreements guidedmore » by avoided cost calculations that assumed high future costs for energy alternatives. Circumstances have changed. Historically low oil prices, economic recession, and rising electricity rates have made biomass fueled power plants some of the most expensive sources of electricity on the power grid. Utilities are responding to rising rates, to public and political pressure to control costs and lower rates by seeking to renegotiate or buy out power contracts and closing biomass plants. While there are strong demands to control electricity costs, there are equally strong concerns about losing the benefits that accrue from the use of indigenous renewable resources. This article evaluates the actions of Maine utilities, independent power producers, the Maine Public Utilities Commission, and the Main Legislature related to PURPA contracts and their likely effects on the future of the biomass power industry in Maine. In particular, we will describe Maine`s new Electric Rate Stabilization Program and subsequent efforts of the Executive Branch to mediate a compromise solution in one case of a utility buy out of a biomass power plant.« less

  13. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... opportunity to purchase and/or market the power that would be generated by such development under a lease of... develop hydroelectric power at Granby Dam Outlet, and power purchasing and/or marketing considerations... Office (GP-2200), P.O. Box 36900, Billings, MT 59107-6900. Information related to Western's purchasing...

  14. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... (Western) would have the first opportunity to purchase and/or market the power that would be generated by... purchasing and/or marketing considerations. Interested entities are invited to submit a proposal on this.... Information related to Western's purchasing and/or marketing the power may be obtained at Western Area Power...

  15. 78 FR 68375 - Removal of Procedures for Closeout of Grants and Cooperative Agreements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ..., Contract Management Division, Washington, DC 20546. Comments may also be submitted by email to: leigh... Procurement, Contract Management Division (Room 2P77); Telephone: (202) 358-0592; Email: [email protected] encouraged to perform retrospective analysis, reviewing existing regulation for outmoded, ineffective...

  16. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  17. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  18. 41 CFR 101-30.101-8 - Conversion.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Conversion. 101-30.101-8 Section 101-30.101-8 Public Contracts and Property Management Federal Property Management Regulations...-General § 101-30.101-8 Conversion. Conversion means the changeover from using existing supply...

  19. 41 CFR 101-30.101-8 - Conversion.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Conversion. 101-30.101-8 Section 101-30.101-8 Public Contracts and Property Management Federal Property Management Regulations...-General § 101-30.101-8 Conversion. Conversion means the changeover from using existing supply...

  20. 32 CFR Appendix A to Part 290 - DCAA's Organization and Mission

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... practices and procedures to give advice and recommendations to procurement and contract administration... administration with financial information and advice on proposed or existing contracts and contractors, as... Counsel provides legal and legislative advice to the Director and all members of the Agency staff. (vii...

  1. 75 FR 8909 - Funding Opportunity Title: Commodity Partnerships for Small Agricultural Risk Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... agreement program is to deliver training and information in management of production, marketing, and... ``* * * producers will be better able to use financial management, crop insurance, marketing contracts, and other... to use financial management, crop insurance, marketing contracts, and other existing and emerging...

  2. Plasma instability control toward high fluence, high energy x-ray continuum source

    NASA Astrophysics Data System (ADS)

    Poole, Patrick; Kirkwood, Robert; Wilks, Scott; Blue, Brent

    2017-10-01

    X-ray source development at Omega and NIF seeks to produce powerful radiation with high conversion efficiency for material effects studies in extreme fluence environments. While current K-shell emission sources can achieve tens of kJ on NIF up to 22 keV, the conversion efficiency drops rapidly for higher Z K-alpha energies. Pulsed power devices are efficient generators of MeV bremsstrahlung x-rays but are unable to produce lower energy photons in isolation, and so a capability gap exists for high fluence x-rays in the 30 - 100 keV range. A continuum source under development utilizes instabilities like Stimulated Raman Scattering (SRS) to generate plasma waves that accelerate electrons into high-Z converter walls. Optimizing instabilities using existing knowledge on their elimination will allow sufficiently hot and high yield electron distributions to create a superior bremsstrahlung x-ray source. An Omega experiment has been performed to investigate the optimization of SRS and high energy x-rays using Au hohlraums with parylene inner lining and foam fills, producing 10× greater x-ray yield at 50 keV than conventional direct drive experiments on the facility. Experiment and simulation details on this campaign will be presented. This work was performed under the auspices of the US DoE by LLNL under Contract No. DE-AC52-07NA27344.

  3. 25.5 Betavoltaic Power Cells

    DTIC Science & Technology

    2006-01-01

    Conference Paper POSTPRINT 3. DATES COVERED (From - To) 2004 - 2006 4. TITLE AND SUBTITLE 25.5 Betavoltaic Power Cells 5a. CONTRACT NUMBER FA9453-04...Sources Conference, 12-15 Jun 06, Philadelphia, PA Government Purpose Rights 14. ABSTRACT Betavoltaic power cells utilize beta-emitting...radioisotopes and semiconductor devices to produce long-lived power in a variety of small form factors. Qynergy is developing betavoltaic power cells based on

  4. 41 CFR 51-2.2 - Powers and responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 2-COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED § 51-2.2 Powers and responsibilities. The Committee...

  5. 41 CFR 51-2.2 - Powers and responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 2-COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED § 51-2.2 Powers and responsibilities. The Committee...

  6. 41 CFR 51-2.2 - Powers and responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 2-COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED § 51-2.2 Powers and responsibilities. The Committee...

  7. 41 CFR 51-2.2 - Powers and responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 2-COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED § 51-2.2 Powers and responsibilities. The Committee...

  8. 41 CFR 51-2.2 - Powers and responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 2-COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED § 51-2.2 Powers and responsibilities. The Committee...

  9. Thresholds of cortical activation of muscle spindles and α motoneurones of the baboon's hand

    PubMed Central

    Koeze, T. H.; Phillips, C. G.; Sheridan, J. D.

    1968-01-01

    1. Much current thinking about voluntary movement assumes that the segmental γ loops can function as a servomechanism operated by the brain. However, the α motoneurones of the baboon's hand receive a powerful monosynaptic (CM) projection from the precentral gyrus. If servo-driving from the same cortical area is to be possible, it must project independently to the fusimotor neurones and have sufficient power to increase the afferent signalling from the muscle spindles. The cortical thresholds for contraction of m. extensor digitorum communis and for acceleration of the discharges of its muscle spindles have therefore been compared. 2. Significant results in this context require that the spindles studied be coupled in parallel with the responding extrafusal muscle fibres. Many spindles were not unloaded by the submaximal contractions evoked by cortical stimulation, although all so tested were unloaded by maximal motor nerve twitches. Reasons are given for thinking that such apparent lack of parallel coupling is an artifact of complex intramuscular anatomy and limitation of shortening by `isometric' myography. 3. A brief burst of corticospinal volleys at 500/sec, which is specially effective in exciting α motoneurones over the CM projection, failed to excite spindle afferents at or below the threshold for a cortical `twitch'. 4. In a few epileptiform discharges, bursts of spindle acceleration occurred independently of the clonic contractions. A relatively direct and independent cortico-fusimotor (CF) projection may therefore exist. 5. Prolonged near-threshold stimulation at 50-100/sec, which allows time for temporal summation in the less direct projections (e.g. cortico-interneuronal, cortico-rubro-spinal) and does not cause frequency-potentiation at CM synapses, gives abundant evidence of independent α and fusimotor projections, whose actions hardly outlast the stimulation period. 6. Although independent CF projections would permit servo-driving in natural movements of the hand (given adequate loop gain), there has been no evidence of servo-driving by cortical stimulation or in the spontaneous contractions of light anaesthesia. 7. Independent projections would provide for controlled αγ co-excitation in the servo-governing of natural movements (Matthews, 1964). 8. Evidence is reviewed that the CM projection itself may be part of an important control loop for voluntary movement in primates. A corollary would be a diminished importance of CF projections for segmental loops and an increased importance for maintaining the spindle input to cortical loops. PMID:4231033

  10. 75 FR 6197 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... Contract Funding, L.L.C., Vineland Energy LLC, Central Power & Lime LLC, Cedar Brakes II, L.L.C., J.P..., 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER97-870-016. Applicants: Sunoco Power Marketing LLC. Description: Sunoco Power Marketing, LLC submits...

  11. 7 CFR 1786.99 - Eligibility criteria.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... borrower will not, without the approval in writing of the power supplier and the Administrator, take or... provided in the respective Notes; and (g) If the borrower is a party to a wholesale power contract with a power supplier financed pursuant to the Act, the borrower must provide the Administrator with such...

  12. 7 CFR 1786.99 - Eligibility criteria.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... borrower will not, without the approval in writing of the power supplier and the Administrator, take or... provided in the respective Notes; and (g) If the borrower is a party to a wholesale power contract with a power supplier financed pursuant to the Act, the borrower must provide the Administrator with such...

  13. 78 FR 62627 - Sam Rayburn Dam Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  14. 78 FR 27178 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... Generation and Transmission cooperatives (G&T's) that generate or purchase power and transmit the power to the distribution systems. All RUS and G&T borrowers will enter into a Wholesale Power Contract with... the credit quality and credit worthiness of loans and loan guarantees to G&T borrowers. RUS works...

  15. A study on contraction of pneumatic artificial muscle (PAM) for load-lifting

    NASA Astrophysics Data System (ADS)

    Najmuddin, W. S. W. A.; Mustaffa, M. T.

    2017-10-01

    Pneumatic Artificial Muscles (PAMs) have been known for its wide application in various aspects of industrial automation and robotic equipments. Many advantages in terms of high power-to-volume ratio, high power-to-weight ratio, stick-slip-free operation and high degree of safety offer by PAM compare to traditional actuators. However, behind this benefits lie a limitation of significant compatibility of PAM mechanism which have to be considered so as to fully understand how the PAM works during load-lifting. In this study, the mesh suitability experiment and the effect of force load on PAM contraction experiment have been carried out. PAM is constructed and compatibility of bladder and the braided mesh to produce uniform expansion is investigated. Moreover, the first experimental result of finding compatibility is used to verify the contraction value under various loads.

  16. Population-based contracting (population health): part II.

    PubMed

    Jacofsky, D J

    2017-11-01

    Modern healthcare contracting is shifting the responsibility for improving quality, enhancing community health and controlling the total cost of care for patient populations from payers to providers. Population-based contracting involves capitated risk taken across an entire population, such that any included services within the contract are paid for by the risk-bearing entity throughout the term of the agreement. Under such contracts, a risk-bearing entity, which may be a provider group, a hospital or another payer, administers the contract and assumes risk for contractually defined services. These contracts can be structured in various ways, from professional fee capitation to full global per member per month diagnosis-based risk. The entity contracting with the payer must have downstream network contracts to provide the care and facilities that it has agreed to provide. Population health is a very powerful model to reduce waste and costs. It requires a deep understanding of the nuances of such contracting and the appropriate infrastructure to manage both networks and risk. Cite this article: Bone Joint J 2017;99-B:1431-4. ©2017 The British Editorial Society of Bone & Joint Surgery.

  17. Particle Acceleration via Reconnection Processes in the Supersonic Solar Wind

    NASA Astrophysics Data System (ADS)

    Zank, G. P.; le Roux, J. A.; Webb, G. M.; Dosch, A.; Khabarova, O.

    2014-12-01

    An emerging paradigm for the dissipation of magnetic turbulence in the supersonic solar wind is via localized small-scale reconnection processes, essentially between quasi-2D interacting magnetic islands. Charged particles trapped in merging magnetic islands can be accelerated by the electric field generated by magnetic island merging and the contraction of magnetic islands. We derive a gyrophase-averaged transport equation for particles experiencing pitch-angle scattering and energization in a super-Alfvénic flowing plasma experiencing multiple small-scale reconnection events. A simpler advection-diffusion transport equation for a nearly isotropic particle distribution is derived. The dominant charged particle energization processes are (1) the electric field induced by quasi-2D magnetic island merging and (2) magnetic island contraction. The magnetic island topology ensures that charged particles are trapped in regions where they experience repeated interactions with the induced electric field or contracting magnetic islands. Steady-state solutions of the isotropic transport equation with only the induced electric field and a fixed source yield a power-law spectrum for the accelerated particles with index α = -(3 + MA )/2, where MA is the Alfvén Mach number. Considering only magnetic island contraction yields power-law-like solutions with index -3(1 + τ c /(8τdiff)), where τ c /τdiff is the ratio of timescales between magnetic island contraction and charged particle diffusion. The general solution is a power-law-like solution with an index that depends on the Alfvén Mach number and the timescale ratio τdiff/τ c . Observed power-law distributions of energetic particles observed in the quiet supersonic solar wind at 1 AU may be a consequence of particle acceleration associated with dissipative small-scale reconnection processes in a turbulent plasma, including the widely reported c -5 (c particle speed) spectra observed by Fisk & Gloeckler and Mewaldt et al.

  18. Particle acceleration via reconnection processes in the supersonic solar wind

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zank, G. P.; Le Roux, J. A.; Webb, G. M.

    An emerging paradigm for the dissipation of magnetic turbulence in the supersonic solar wind is via localized small-scale reconnection processes, essentially between quasi-2D interacting magnetic islands. Charged particles trapped in merging magnetic islands can be accelerated by the electric field generated by magnetic island merging and the contraction of magnetic islands. We derive a gyrophase-averaged transport equation for particles experiencing pitch-angle scattering and energization in a super-Alfvénic flowing plasma experiencing multiple small-scale reconnection events. A simpler advection-diffusion transport equation for a nearly isotropic particle distribution is derived. The dominant charged particle energization processes are (1) the electric field induced bymore » quasi-2D magnetic island merging and (2) magnetic island contraction. The magnetic island topology ensures that charged particles are trapped in regions where they experience repeated interactions with the induced electric field or contracting magnetic islands. Steady-state solutions of the isotropic transport equation with only the induced electric field and a fixed source yield a power-law spectrum for the accelerated particles with index α = –(3 + M{sub A} )/2, where M{sub A} is the Alfvén Mach number. Considering only magnetic island contraction yields power-law-like solutions with index –3(1 + τ {sub c}/(8τ{sub diff})), where τ {sub c}/τ{sub diff} is the ratio of timescales between magnetic island contraction and charged particle diffusion. The general solution is a power-law-like solution with an index that depends on the Alfvén Mach number and the timescale ratio τ{sub diff}/τ {sub c}. Observed power-law distributions of energetic particles observed in the quiet supersonic solar wind at 1 AU may be a consequence of particle acceleration associated with dissipative small-scale reconnection processes in a turbulent plasma, including the widely reported c {sup –5} (c particle speed) spectra observed by Fisk and Gloeckler and Mewaldt et al.« less

  19. Integrated, automated revenue management for managed care contracts.

    PubMed

    Burckhart, Kent

    2002-04-01

    Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.

  20. Contract law--it's only as good as the people.

    PubMed

    George, James

    2004-02-01

    There is a frequently spoken phrase in law known as "Res Ipsa Loquitur." This Latin phrase translates in English to mean, "The thing speaks for itself." It is hoped the title of this article speaks for itself. The simple truth is that a contract is only as good as the people and institutions it binds. This does not mean that contracts should not exist or that important details of a contractual relationship should not be in writing. In essence, contracts are society's best attempt to memorialize the details of a business relationship between people and entities.

  1. Practical comparison of distributed ledger technologies for IoT

    NASA Astrophysics Data System (ADS)

    Red, Val A.

    2017-05-01

    Existing distributed ledger implementations - specifically, several blockchain implementations - embody a cacophony of divergent capabilities augmenting innovations of cryptographic hashes, consensus mechanisms, and asymmetric cryptography in a wide variety of applications. Whether specifically designed for cryptocurrency or otherwise, several distributed ledgers rely upon modular mechanisms such as consensus or smart contracts. These components, however, can vary substantially among implementations; differences involving proof-of-work, practical byzantine fault tolerance, and other consensus approaches exemplify distinct distributed ledger variations. Such divergence results in unique combinations of modules, performance, latency, and fault tolerance. As implementations continue to develop rapidly due to the emerging nature of blockchain technologies, this paper encapsulates a snapshot of sensor and internet of things (IoT) specific implementations of blockchain as of the end of 2016. Several technical risks and divergent approaches preclude standardization of a blockchain for sensors and IoT in the foreseeable future; such issues will be assessed alongside the practicality of IoT applications among Hyperledger, Iota, and Ethereum distributed ledger implementations suggested for IoT. This paper contributes a comparison of existing distributed ledger implementations intended for practical sensor and IoT utilization. A baseline for characterizing distributed ledger implementations in the context of IoT and sensors is proposed. Technical approaches and performance are compared considering IoT size, weight, and power limitations. Consensus and smart contracts, if applied, are also analyzed for the respective implementations' practicality and security. Overall, the maturity of distributed ledgers with respect to sensor and IoT applicability will be analyzed for enterprise interoperability.

  2. 41 CFR 60-20.4 - Seniority system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Seniority system. 60-20.4 Section 60-20.4 Public Contracts and Property Management Other Provisions Relating to Public... 20-SEX DISCRIMINATION GUIDELINES § 60-20.4 Seniority system. Where they exist, seniority lines and...

  3. 41 CFR 60-20.4 - Seniority system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Seniority system. 60-20.4 Section 60-20.4 Public Contracts and Property Management Other Provisions Relating to Public... 20-SEX DISCRIMINATION GUIDELINES § 60-20.4 Seniority system. Where they exist, seniority lines and...

  4. Program Elimination, Financial Emergency, and Student Rights.

    ERIC Educational Resources Information Center

    Olswang, Steven Glenn; And Others

    1982-01-01

    The rights of students to complete programs into which they have matriculated and the obligations of colleges and universities to maintain these programs for sufficient periods of time to fulfill any existing contracts with students are discussed. Contract principles are applied in protecting a student's right to complete degree programs. (MLW)

  5. Jackie Cannon Learns the Importance of a Written Contract.

    ERIC Educational Resources Information Center

    Flygare, Thomas J.

    1983-01-01

    The Fifth Circuit Court of Appeals found that a Texas school superintendent, having failed to submit a written contract to the school board for execution, had no basis for holding that a property interest in employment existed. Certainty about binding obligations requires written agreements signed by both parties. (PB)

  6. 38 CFR 17.81 - Contracts for residential treatment services for veterans with alcohol or drug dependence or...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contract. (6) Demonstrate an existing capability to furnish the following: (i) A supervised alcohol and... social service. (x) Individual counseling as appropriate. (xi) Opportunities for learning/development of...-free life style). (xiii) Opportunities for learning, testing, and internalizing knowledge of illness...

  7. 38 CFR 17.81 - Contracts for residential treatment services for veterans with alcohol or drug dependence or...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contract. (6) Demonstrate an existing capability to furnish the following: (i) A supervised alcohol and... social service. (x) Individual counseling as appropriate. (xi) Opportunities for learning/development of...-free life style). (xiii) Opportunities for learning, testing, and internalizing knowledge of illness...

  8. Mechanical characteristics of distension-evoked peristaltic contractions in the esophagus of systemic sclerosis patients.

    PubMed

    Gregersen, Hans; Villadsen, Gerda E; Liao, Donghua

    2011-12-01

    Systemic sclerosis (SS) patients with severe esophageal affection have impaired peristalsis. However, motor function evaluated in vivo by manometry and fluoroscopy does not provide detailed information about the individual contraction cycles. To apply, for the first time in gastrointestinal (GI) patients, a method and principles modified from cardiac research to study esophageal muscle behavior in SS patients. Muscle contraction cycles were analyzed using pressure-cross-sectional area (P-CSA) loops during distension pressure up to 5 kPa. The probe with bag and electrodes for CSA measurements was positioned 7 and 15 cm above the lower esophageal sphincter (LES) in eleven healthy volunteers and eleven SS patients. The P-CSA, the wall tension, Δtension (afterload tension - preload tension), contraction velocity, work output (area of the tension-CSA loops), and power output (preload tension × CSA rate) were analyzed. The P-CSA loops consisted of phases with relaxation and contraction behavior. The tension-stretch ratio loops in patients were shifted to the left at both distension sites, indicative of a stiffer wall in patients. Lower contraction amplitudes and smaller P-CSA loops were observed for the SS patients. The work output, power output, Δtension, and contraction velocity were lower in patients (P < 0.001). Association was found between disease duration and the work output, Δtension, and velocity at pressure steps higher than 3 kPa (P < 0.05). Distension-evoked esophageal contraction can be studied in vivo and analyzed with advanced methods. Increased esophageal stiffness and impaired muscle function that depended on disease duration were observed for SS patients. The analysis may be useful for characterization of other diseases affecting GI function.

  9. Analysis of the 918th Contracting Battalion and 410th Contracting Support Brigade Utilizing the Contract Management Maturity Model

    DTIC Science & Technology

    2015-12-01

    acquisition workforce. The addition of employee turnover to the existing pressure can cause a loss of knowledge within the workforce. The typical...manpower (Gabbert, 2015). Sequestration has resulted in decreased manpower and more frequent workforce turnover , which places a strain on...on the more complex actions to the center to which they are assigned. In this way, the offices and their employees can become more specialized. B

  10. Interlimb symmetry of dynamic knee joint stiffness and co-contraction is maintained in early stage knee osteoarthritis.

    PubMed

    Collins, A T; Richardson, R T; Higginson, J S

    2014-08-01

    Individuals with knee OA often exhibit greater co-contraction of antagonistic muscle groups surrounding the affected joint which may lead to increases in dynamic joint stiffness. These detrimental changes in the symptomatic limb may also exist in the contralateral limb, thus contributing to its risk of developing knee osteoarthritis. The purpose of this study is to investigate the interlimb symmetry of dynamic knee joint stiffness and muscular co-contraction in knee osteoarthritis. Muscular co-contraction and dynamic knee joint stiffness were assessed in 17 subjects with mild to moderate unilateral medial compartment knee osteoarthritis and 17 healthy control subjects while walking at a controlled speed (1.0m/s). Paired and independent t-tests determined whether significant differences exist between groups (p<0.05). There were no significant differences in dynamic joint stiffness or co-contraction between the OA symptomatic and OA contralateral group (p=0.247, p=0.874, respectively) or between the OA contralateral and healthy group (p=0.635, p=0.078, respectively). There was no significant difference in stiffness between the OA symptomatic and healthy group (p=0.600); however, there was a slight trend toward enhanced co-contraction in the symptomatic knees compared to the healthy group (p=0.051). Subjects with mild to moderate knee osteoarthritis maintain symmetric control strategies during gait. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Interlimb symmetry of dynamic knee joint stiffness and co-contraction is maintained in early stage knee osteoarthritis

    PubMed Central

    Collins, A.T.; Richardson, R.T.; Higginson, J.S.

    2014-01-01

    Individuals with knee OA often exhibit greater co-contraction of antagonistic muscle groups surrounding the affected joint which may lead to increases in dynamic joint stiffness. These detrimental changes in the symptomatic limb may also exist in the contralateral limb, thus contributing to its risk of developing knee osteoarthritis. The purpose of this study is to investigate the interlimb symmetry of dynamic knee joint stiffness and muscular co-contraction in knee osteoarthritis. Muscular co-contraction and dynamic knee joint stiffness were assessed in 17 subjects with mild to moderate unilateral medial compartment knee osteoarthritis and 17 healthy control subjects while walking at a controlled speed (1.0 m/s). Paired and independent t-tests determined whether significant differences exist between groups (p < 0.05). There were no significant differences in dynamic joint stiffness or co-contraction between the OA symptomatic and OA contralateral group (p = 0.247, p = 0.874, respectively) or between the OA contralateral and healthy group (p = 0.635, p = 0.078, respectively). There was no significant difference in stiffness between the OA symptomatic and healthy group (p = 0.600); however, there was a slight trend toward enhanced co-contraction in the symptomatic knees compared to the healthy group (p = 0.051). Subjects with mild to moderate knee osteoarthritis maintain symmetric control strategies during gait. PMID:24768278

  12. Preferred supplier contracts in post-patent prescription drug markets.

    PubMed

    Blankart, Carl Rudolf; Stargardt, Tom

    2016-02-22

    In recent years, the expiration of patents for large drug classes has increased the importance of post-patent drug markets. However, previous research has focused solely on patent drug markets. In this study, the authors evaluate the influence of preferred supplier contracts, the German approach to tendering, in post-patent drug markets using a hierarchical market share attraction model. The authors find that preferred supplier contracts are a powerful strategic instrument for generic manufacturers in a highly competitive environment. They quantify the effects of signing a preferred supplier contract and show that brand-name manufacturers are vulnerable to tendering. Therefore, brand-name manufacturers should readjust their strategies and consider including preferred supplier contracts in their marketing mix. In addition, the authors employ a simulation to demonstrate that a first-mover advantage might be gained from signing a preferred supplier contract. Furthermore, their results can be used as a blueprint for decision makers in the pharmaceutical industry to assess the market share effects of different contracting strategies regarding preferred supplier contracts.

  13. 7 CFR 1717.308 - RUS approval of nonconforming rates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.308 RUS approval of... of the RUS wholesale power contract and other RUS documents if RUS determines, in its sole discretion...

  14. 7 CFR 1717.308 - RUS approval of nonconforming rates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.308 RUS approval of... of the RUS wholesale power contract and other RUS documents if RUS determines, in its sole discretion...

  15. Metasurface with Reconfigurable Reflection Phase for High-Power Microwave Applications (Briefing Charts)

    DTIC Science & Technology

    2014-06-25

    Metasurfaces with Reconfigurable Reflection Phase for High-Power Microwave Applications Kenneth L. Morgan, Clinton P. Scarborough, Micah D...TITLE AND SUBTITLE Metasurface with Reconfigurable Reflection Phase for High- Power Microwave Applications 5a. CONTRACT NUMBER 5b...Examples that demonstrate theoretical methods for extending the operating power levels of metasurface reflectarrays have been given •The proposed

  16. Organic Rankine Kilowatt Isotope Power System. Final phase I report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-07-15

    On 1 August 1975 under Department of Energy Contract EN-77-C-02-4299, Sundstrand Energy Systems commenced development of a Kilowatt Isotope Power System (KIPS) directed toward satisfying the higher power requirements of satellites of the 1980s and beyond. The KIPS is a /sup 238/PuO/sub 2/ fueled organic Rankine cycle turbine power system which will provide design output power in the range of 500 to 2000 W/sub (e)/ with a minimum of system changes. The principal objectives of the Phase 1 development effort were to: conceptually design a flight system; design a Ground Demonstration System (GDS) that is prototypic of the flight systemmore » in order to prove the feasibility of the flight system design; fabricate and assemble the GDS; and performance and endurance test the GDS using electric heaters in lieu of the isotope heat source. Results of the work performed under the Phase 1 contract to 1 July 1978 are presented.« less

  17. 29 CFR 6.6 - Administrative Law Judge.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Administrative Law Judge. 6.6 Section 6.6 Labor Office of... FEDERAL AND FEDERALLY ASSISTED CONSTRUCTION CONTRACTS AND FEDERAL SERVICE CONTRACTS General § 6.6... provisions of this part 6, Administrative Law Judges shall have no power or authority to award attorney fees...

  18. 78 FR 67188 - Agency Information Collection Activities: Submitted for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... production method. 1206.259(c)(1)(ii) and (c)(2)(iii). Submit arm's-length and non- AUDIT PROCESS (See Note...-length AUDIT PROCESS (See Note). transportation contracts, production agreements, operating agreements...-length AUDIT PROCESS (See Note). power plant contracts, production and operating agreements and related...

  19. 78 FR 9732 - Agency Information Collection Activities: Submitted for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ...-length AUDIT PROCESS--See Note. transmission contracts, production and operating agreements and related... interest. 1206.354(n) Submit all arm's-length AUDIT PROCESS--See Note. power plant contracts, production... production method. 1206.458(c)(1)(iv) and (c)(2)(vi).. Submit arm's-length washing AUDIT PROCESS--See Note...

  20. 48 CFR 27.405-2 - Existing works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Data and Copyrights 27.405-2 Existing works. The clause at 52.227-18, Rights in Data—Existing Works, is for use in contracts exclusively for the acquisition.... Examples of these limitations are means of exhibition or transmission, time, type of audience, and...

  1. 45 CFR 152.39 - Maintenance of effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-EXISTING CONDITION INSURANCE PLAN PROGRAM Relationship to Existing Laws and Programs § 152.39 Maintenance... the contract is entered. (b) Failure to maintain efforts. In situations where a State enters into a..., against any State that fails to maintain funding levels for existing State high risk pools as required...

  2. The managed care contract: survival or closure?

    PubMed

    Potter, L

    1999-01-01

    The managed health care contract can be considered the most powerful tool in the health care environment today. Providers of care as well as insurers need to fully comprehend the legal and financial impact of these contracts. Too many organizations (providers and insurers) are getting caught in financial failure, resulting in bottom line-driven health care. It seems that the days of providing the most ethically appropriate health care are gone. Too much emphasis has been put on providers and administrators to provide the care that will result in positive income. The only way to "protect" oneself is in the creation, negotiation, and administration of the managed health care contract.

  3. Biomechanical characteristics of skeletal muscles and associations between running speed and contraction time in 8- to 13-year-old children.

    PubMed

    Završnik, Jernej; Pišot, Rado; Šimunič, Boštjan; Kokol, Peter; Blažun Vošner, Helena

    2017-02-01

    Objective To investigate associations between running speeds and contraction times in 8- to 13-year-old children. Method This longitudinal study analyzed tensiomyographic measurements of vastus lateralis and biceps femoris muscles' contraction times and maximum running speeds in 107 children (53 boys, 54 girls). Data were evaluated using multiple correspondence analysis. Results A gender difference existed between the vastus lateralis contraction times and running speeds. The running speed was less dependent on vastus lateralis contraction times in boys than in girls. Analysis of biceps femoris contraction times and running speeds revealed that running speeds of boys were much more structurally associated with contraction times than those of girls, for whom the association seemed chaotic. Conclusion Joint category plots showed that contraction times of biceps femoris were associated much more closely with running speed than those of the vastus lateralis muscle. These results provide insight into a new dimension of children's development.

  4. Novel Application of Carbonate Fuel Cell for Capturing Carbon Dioxide from Flue Gas Streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jolly, Stephen; Ghezel-Ayagh, Hossein; Willman, Carl

    To address concerns about climate change resulting from emission of CO2 by coal-fueled power plants, FuelCell Energy, Inc. has developed the Combined Electric Power and Carbon-dioxide Separation (CEPACS) system concept. The CEPACS system utilizes Electrochemical Membrane (ECM) technology derived from the Company’s Direct FuelCell® products. The system separates the CO2 from the flue gas of other plants and produces electric power using a supplementary fuel. FCE is currently evaluating the use of ECM to cost effectively separate CO2 from the flue gas of Pulverized Coal (PC) power plants under a U.S. Department of Energy contract. The overarching objective of themore » project is to verify that the ECM can achieve at least 90% CO2 capture from the flue gas with no more than 35% increase in the cost of electricity. The project activities include: 1) laboratory scale operational and performance tests of a membrane assembly, 2) performance tests of the membrane to evaluate the effects of impurities present in the coal plant flue gas, in collaboration with Pacific Northwest National Laboratory, 3) techno-economic analysis for an ECM-based CO2 capture system applied to a 550 MW existing PC plant, in partnership with URS Corporation, and 4) bench scale (11.7 m2 area) testing of an ECM-based CO2 separation and purification system.« less

  5. 12 CFR 7.4009 - Applicability of state law to national bank operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operations. (a) Authority of national banks. A national bank may exercise all powers authorized to it under... laws that obstruct, impair, or condition a national bank's ability to fully exercise its powers to... they only incidentally affect the exercise of national bank powers: (i) Contracts; (ii) Torts; (iii...

  6. 77 FR 48135 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...: J.P. Morgan Ventures Energy Corporation, Triton Power Michigan LLC, BE Allegheny LLC, BE CA LLC, BE... Contract Funding, L.L.C., Central Power & Lime LLC, Cedar Brakes II, L.L.C., J.P. Morgan Commodities Canada...; ER10-2898-008. Applicants: J.P. Morgan Ventures Energy Corporation, Triton Power Michigan LLC, BE...

  7. 7 CFR 1717.302 - Definitions and rules of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.302... otherwise stated in the text, “borrower” shall mean power supply borrower. Loan contract means the agreement... loans made or guaranteed pursuant to the RE Act. Power supply borrower means any borrower engaged in the...

  8. 7 CFR 1717.304 - State regulatory authority rate jurisdiction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GUARANTEED ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717... terms of the RUS wholesale power contract or other RUS documents may be subject to the approval of a state regulatory authority, the power supply borrower shall seek such required approval in a timely...

  9. 7 CFR 1717.302 - Definitions and rules of construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717.302... otherwise stated in the text, “borrower” shall mean power supply borrower. Loan contract means the agreement... loans made or guaranteed pursuant to the RE Act. Power supply borrower means any borrower engaged in the...

  10. 7 CFR 1717.304 - State regulatory authority rate jurisdiction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... GUARANTEED ELECTRIC LOANS Federal Pre-emption in Rate Making in Connection With Power Supply Borrowers § 1717... terms of the RUS wholesale power contract or other RUS documents may be subject to the approval of a state regulatory authority, the power supply borrower shall seek such required approval in a timely...

  11. Arkansas 50m Wind Power Class

    Science.gov Websites

    Geospatial_Data_Presentation_Form: vector digital data Other_Citation_Details: The wind power resource estimates were produced by AWS TrueWind using their MesoMap system and historical weather data under contract to Wind Powering America/NREL. This map has been validated with available surface data by NREL and wind energy

  12. Use of T12 lighting systems in retrofit applications within New York Office of Mental Health Facilities - A case history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henry, C.P.; Marsh, E.J.

    1997-06-01

    In 1990, the Governor of New York State issued Executive Order No. 132, directing all state agencies to reduce energy consumption by 20% from the base year of 1988/89 by the year 2000. To assist in meeting this goal, the New York State Office of Mental Health (OMH) established the Lighting Revitalization Program in 1992. State facilities are divided into five regions, each served by existing Environmental Revitalization Teams. OMH supplemented these teams with lighting technicians in this new program. The program`s goal was to rehabilitate outdated, inefficient lighting systems throughout 28 OMH facilities, totaling 28 million square feet inmore » area. OMH requested the former Facility Development Corporation (FDC), now the Dormitory Authority of the State of New York (DASNY), to contract with Novus Engineering to evaluate the relative efficiency of T8 and T12 ballasts. Novus contracted an independent laboratory, Eastern Testing Laboratories (ETL), for performance testing. ETL tested four ballast/lamp configurations for light Output and input power, and Novus analyzed the results for relative efficiency and also calculated 25-year life cycle costs. The test results indicated that the efficiencies of the T12/34W and T8/32W ballast/lamp technologies were nearly identical. The input power and light output of these systems were similar. The lumens per Watt ratings for the two systems were nearly equal, with the T8 technology being only about two percent more efficient, generating more light with similar input power. The life cycle costs for the two systems were nearly identical, with the T12 system providing a slightly lower life cycle cost. Given the above considerations, the agency has been installing T12 electronic ballasts and 34W lamps in buildings where fluorescent fixtures warranted upgrading. This type of retrofit goes against current trends, but the use of T8 system could not be justified in buildings undergoing minor retrofitting.« less

  13. UF/RO applications at the Browns Ferry Nuclear Power Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palino, G.F.; Sailor, W.C.; Sawochka, S.G.

    1981-04-01

    In June 1979, NWT was contracted by TVA to review the applicability of reverse osmosis (RO) and ultrafiltration (UF) membrane treatment technology at the Browns Ferry Nuclear Power Station. Specific program tasks are described and results presented.

  14. Contingency Contracting in Support of Conus Disasters: A Case Study of the 1994 Northridge Earthquake, 2005 Hurricane Katrina and 2012 Hurricane Sandy

    DTIC Science & Technology

    2014-06-01

    Northridge earthquake response. The City of Los Angeles and the State of California required contracts to address recycling of demolition materials to the...materials directly recycled and material removed from the site on the enclosed recycling log found within this Contract. Documentation includes...related to recycling disaster debris:  “Incentive payment: The City will pay tipping fees using the existing authorization letter; however, only source

  15. The slow inward calcium current is responsible for a part of the contraction of patch-clamped rat myoballs.

    PubMed

    Rivet, M; Cognard, C; Raymond, G

    1989-01-01

    The slow inward calcium current and the contractile response were simultaneously recorded in voltage clamped (whole cell patch clamp recording) rat myoballs in primary culture. The shape of the contraction(T)/potential(V) relationship and the application of the inorganic calcium channel blocker cadmium (1.5 mM), which suppresses a part of the contractile activity, demonstrate the existence of two components of contraction. One of them is related to the slow calcium current.

  16. Control of continuous phase PH using visible light to activate PH-dependent fibers and gels in a controlled and reversible manner

    NASA Astrophysics Data System (ADS)

    Zirino, Albert

    1994-08-01

    A transparent polyelectrolyte fiber or gel, such as crosslinked polyacrylic acid, which contracts and expands upon the addition of an acid or base to an aqueous medium solution, is placed in the same solution with a pH dependent dye, a colored photochromatic indicator dye. The dye preferably has a pAa value that is the same as the pH at a null contraction point of the fiber. By irradiating the solution with light of a wavelength of the absorption band of either the acid or base form of the dye, the solution pH is made to change, and the fiber is made to expand or contract, depending upon the wavelength. Thus, light energy is readily converted to work energy and may be used to power a pump, for example or an artificial muscle can be powered via an optical fiber.

  17. Contracts for dispatchable power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kahn, E.P.; Stoft, S.; Marnay, C.

    1990-10-01

    Competitive bidding for electric power is maturing. Increasing numbers of utilities are soliciting proposals from private suppliers. The amount of capacity being sought is increasing, and potential suppliers appear to be abundant. Analysis of these developments still remains limited. Evidence on the behavior of this market is scarce and sketchy. The underlying economic principles that are shaping the market have not clearly been articulated. In this report we examine the economics of competitive bidding both empirically and analytically. Previous study of this market has focused on the evaluation criteria specified in Requests for Proposals (RFPs), and highly aggregated summary statisticsmore » on participation and results. We continue the examination of RFPs, but also survey the details of long term contracts that have emerged from competitive bidding. Contracts provide a new level of specific detail that has not been previously available. 68 refs., 13 figs., 25 tabs.« less

  18. Turbine Research Program Cold Weather Turbine Project: Period of Performance May 27, 1999 -- March 31, 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, J.; Bywaters, G.; Costin, D.

    2004-08-01

    Northern Power Systems completed the Cold Weather Turbine (CWT) project, which was funded by the National Renewable Energy Laboratory (NREL), under subcontract XAT-9-29200-01. The project's primary goal is to develop a 100-kW wind turbine suited for deployment in remote villages in cold regions. The contract required testing and certification of the turbine to the International Electrotechnical Commission (IEC) 61400-1 international standard through Underwriters Laboratories (UL). The contract also required Northern Power Systems to study design considerations for operation in extreme cold (-80F at the South Pole, for example). The design was based on the successful proof of concept (POC) turbinemore » (developed under NREL and NASA contracts), considered the prototype turbine that would be refined and manufactured to serve villages in cold regions around the world.« less

  19. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  20. 77 FR 30367 - Defense Federal Acquisition Regulation Supplement: Order of Application for Modifications (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... sequence of modifications to a contract or order, a method for determining the order of application for... application for modifications. (a) Circumstances may exist in which the numeric order of the modifications to... date and the same signature date, procuring contracting office modifications will be applied in numeric...

  1. Finding a Way: Library Master Agreements at the University of Tennessee

    ERIC Educational Resources Information Center

    Halaychik, Corey S.

    2015-01-01

    The contract-review and approval process for purchasing and renewing electronic resources at the University of Tennessee had become cumbersome to campus libraries. To streamline existing procedures, the campus libraries, the Office of Contracts Administration, and the Purchasing Department collaborated to find a solution that restored a measure of…

  2. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...

  3. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...

  4. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...

  5. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...

  6. 46 CFR 76.25-90 - Installations contracted for prior to September 30, 1997.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Automatic Sprinkling System, Details § 76.25-90 Installations contracted...) The details of the system must be in general agreement with NFPA 13 (incorporated by reference, see 46 CFR 76.01-2) insofar as is reasonable and practicable. Existing piping, pumping facilities, sprinkler...

  7. 48 CFR 235.015-70 - Special use allowances for research facilities acquired by educational institutions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of DoD contracts; (2) Existing facilities, either Government or nongovernment, cannot meet program... effort which results in the special use allowance being excessive compared to the Government research... Defense contracts. FAR 31.3 governs how much the Government will reimburse the institution for the...

  8. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  9. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  10. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  11. 48 CFR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or... work required under this contract. The Contractor shall only remove trees when specifically authorized... trees are broken during contract performance, or by the careless operation of equipment, or by workmen...

  12. Do isokinetic angular velocity and contraction types affect the predictors of different anaerobic power tests?

    PubMed

    Yapici, Aysegul; Findikoglu, Gulin; Dundar, Ugur

    2016-04-01

    The purpose of this study was to investigate the most important predictor isokinetic muscle strength determined by different angular velocities and contraction types (i.e. concentric and eccentric) for selected anaerobic power tests in volleyball players. Twenty male and ten female amateur volleyball players participated in this study. Selected anaerobic power tests included Wingate Anaerobic Test (WAnT), squat jump (SJ) and countermovement jump (CMJ). Peak torque values were obtained at 60, 120, 240˚/s for concentric contraction of quadriceps (Qconc) and Hamstring (Hconc) and at 60˚/s for eccentric contraction of quadriceps (Qecc) and Hconc. Moderate to good correlations (r:0.409 to r:0.887) were found between anaerobic tests and isokinetic data including peak torque and total work of both Hconc and Qconc at 60, 120, 240°/s and Qecc at 60°/s (P<0.05). Qconc measured at each of 60, 120, 240°/s was found to be the only significant predictor for anaerobic tests in linear regression models (P<0.05). Correlation coefficient s for Qconc increased with increasing velocity for each of the anaerobic tests. Correlation coefficient of Qconc was highest for CMJ followed by SJ and WAnT at the same angular velocity. As a distinctive feature, both Qecc and Hconc at 60˚/s were significantly predictors for CMJ and SJ. Qconc peak torque was the single significant predictor for WAnT, SJ and CMJ and strength of the relation increases with increasing angular velocity. However, both Qecc and Hconc were significant indicators for CMJ and SJ. Training with higher isokinetic angular velocities and with eccentric contraction is desirable in a training program that has a goal of improving anaerobic performance in volleyball players.

  13. [Reimbursement of health apps by the German statutory health insurance].

    PubMed

    Gregor-Haack, Johanna

    2018-03-01

    A reimbursement category for "apps" does not exist in German statutory health insurance. Nevertheless different ways for reimbursement of digital health care products or processes exist. This article provides an overview and a description of the most relevant finance and reimbursement categories for apps in German statutory health insurance. The legal qualifications and preconditions of reimbursement in the context of single contracts with one health insurance fund will be discussed as well as collective contracts with national statutory health insurance funds. The benefit of a general outline appeals especially in respect to the numerous new players and products in the health care market. The article will highlight that health apps can challenge existing legal market access and reimbursement criteria and paths. At the same time, these criteria and paths exist. In terms of a learning system, they need to be met and followed.

  14. Rate modulation of human anconeus motor units during high-intensity dynamic elbow extensions.

    PubMed

    Cowling, Brianna L; Harwood, Brad; Copithorne, David B; Rice, Charles L

    2016-08-01

    Investigations of high-intensity isometric fatiguing protocols report decreases in motor unit firing rates (MUFRs), but little is known regarding changes in MUFRs following fatigue induced by high-intensity dynamic contractions. Our purpose was to evaluate MUFRs of the anconeus (an accessory elbow extensor) and elbow extension power production as a function of time to task failure (TTF) during high-velocity fatiguing concentric contractions against a moderately heavy resistance. Fine-wire intramuscular electrode pairs were inserted into the anconeus to record MUs in 12 male participants (25 ± 3 yr), over repeated sessions on separate days. MUs were tracked throughout a three-stage, varying load dynamic elbow extension protocol designed to extend the task duration for >1 min thereby inducing substantial fatigue. Mean MUFRs and peak power were calculated for three relative time ranges: 0-15% TTF (beginning), 45-60% TTF (middle) and 85-100% TTF (end). Mean duration of the overall fatigue protocol was ∼80 s. Following the protocol, isometric maximum voluntary contraction (MVC), highest velocity at 35% MVC load, and peak power decreased 37, 60, and 64% compared with baseline, respectively. Data from 20 anconeus MUs tracked successfully throughout the protocol indicated a reduction in MUFRs in relation to power loss from 36 Hz/160 W (0-15% TTF) to 28 Hz/97 W (45-60% TTF) to 23 Hz/43 W (85-100% TTF). During these high-intensity maximal effort concentric contractions, anconeus MUFRs decreased substantially (>35%). Although the absolute MUFRs were higher in the present study than those reported previously for other muscles during sustained high-intensity isometric tasks, the relative decrease in MUFRs was similar between the two tasks. Copyright © 2016 the American Physiological Society.

  15. Colombia - A Case Study in Smart Power

    DTIC Science & Technology

    2014-05-22

    COLOMBIA–A CASE STUDY IN SMART POWER A Monograph by John P. Brady Foreign Service Officer United States Agency for...Colombia–A Case Study in Smart Power 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) John P. Brady...of Candidate: John P. Brady Monograph Title: Colombia–A Case Study in Smart Power Approved by: , Monograph Director Robert W

  16. Hospital Selective Contracting without Consumer Choice: What Can We Learn from Medi-Cal?

    ERIC Educational Resources Information Center

    Bamezai, Anil; Melnick, Glenn A.; Mann, Joyce M.; Zwanziger, Jack

    2003-01-01

    In the selective contracting era, consumer choice has generally been absent in most state Medicaid programs, including California's (called Medi-Cal). In a setting where beneficiary exit is not a threat, a large payer may have both the incentives and the ability to exercise undue market power, potentially exposing an already vulnerable population…

  17. NASA Awards Chandra X-Ray Observatory Follow-On Contract

    NASA Astrophysics Data System (ADS)

    2003-08-01

    NASA has awarded a contract to the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, one of the world's most powerful tools to better understand the structure and evolution of the universe. The contract will have a period of performance from August 31, 2003, through July 31, 2010, with an estimated value of 373 million. It is a follow-on contract to the existing contract with Smithsonian Astrophysical Observatory that has provided science and operations support to the Observatory since its launch in July 1999. At launch the intended mission life was five years. As a result of Chandra's success, NASA extended the mission from five to 10 years. The value of the original contract was 289 million. The follow-on contract with the Smithsonian Astrophysical Observatory will continue through the 10-year mission. The contract type is cost reimbursement with no fee. The contract covers mission operations and data analysis, which includes the observatory operations, science data processing and the general and guaranteed time observer (astronomer) support. The observatory operations tasks include monitoring the health and status of the observatory and developing and up linking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning, and coordination of science observations with the general observers and processing and delivery of the resulting scientific data. There are approximately 200 to 250 observing proposals selected annually out of about 800 submitted, with a total amount of observing time of about 20 million seconds. Chandra has exceeded expectations of scientists, giving them unique insight into phenomena light years away, such as exotic celestial objects, matter falling into black holes, and stellar explosions. X-ray astronomy can only be performed from space because Earth's atmosphere blocks X-rays from reaching the surface. The Chandra Observatory travels one-third of the way to the moon during its orbit around the Earth every 64 hours. At its highest point, Chandra's highly elliptical, or egg- shaped, orbit is 200 times higher than that of its visible- light-gathering sister, the Hubble Space Telescope. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra program for the Office of Space Science, NASA Headquarters, Washington. Northrop Grumman of Redondo Beach, Calif., formerly TRW, Inc., was the prime development contractor for the observatory. The Smithsonian Astrophysical Observatory controls science and flight operations from the Chandra X-ray Center in Cambridge, Mass. For information about NASA on the Internet, visit: http://www.nasa.gov For information about the Chandra X-ray Observatory on the Internet, visit: http://chandra.harvard.edu and http://chandra.nasa.gov

  18. Characterization of the Los Alamos IPG YLR-6000 fiber laser using multiple optical paths and laser focusing optics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Milewski, John O; Bernal, John E

    2009-01-01

    Fiber laser technology has been identified as the replacement power source for the existing Los Alamos TA-55 production laser welding system. An IPG YLR-6000 fiber laser was purchased, installed at SM-66 R3, and accepted in February 2008. No characterization of the laser and no welding was performed in the Feb 2008 to May 2009 interval. T. Lienert and J. Bernal (Ref. 1, July 2009) determined the existing 200 mm Rofin collimator and focus heads used with the Rofin diode pumped lasers were inadequate for use with the IPG laser due to clipping of the IPG laser beam. Further efforts inmore » testing of the IPG laser with Optoskand fiber delivery optics and a Rofin 120 mm collimator proved problematic due to optical fiber damage. As a result, IPG design optical fibers were purchased as replacements for subsequent testing. Within the same interval, an IPG fiber-to-fiber (F2F) connector, custom built for LANL, (J. Milewski, S. Gravener, Ref.2) was demonstrated and accepted at IPG Oxford, MA in August 2009. An IPG service person was contracted to come to LANL to assist in the installation, training, troubleshooting and characterization of the multiple beam paths and help perform laser head optics characterization. The statement of work is provided below: In summary the laser system, optical fibers, F2F connector, Precitec head, and a modified Rofin type (w/120mm Optoskand collimator) IWindowIBoot system focus head (Figure 1) were shown to perform well at powers up to 6 kW CW. Power measurements, laser spot size measurements, and other characterization data and lessons learned are contained within this report. In addition, a number of issues were identified that will require future resolution.« less

  19. A 3-D Magnetic Analysis of a Stirling Convertor Linear Alternator Under Load

    NASA Technical Reports Server (NTRS)

    Geng, Steven M.; Schwarze, Gene E.; Niedra, Janis M.; Regan, Timothy F.

    2001-01-01

    The NASA Glenn Research Center (GRC), the Department of Energy (DOE), and the Stirling Technology Company (STC) are developing Stirling convertors for Stirling Radioisotope Power Systems (SRPS) to provide electrical power for future NASA deep space missions. STC is developing the 55-We Technology Demonstration Convertor (TDC) under contract to DOE. Of critical importance to the successful development of the Stirling convertor for space power applications is the development of a lightweight and highly efficient linear alternator. This paper presents a 3-dimensional finite element method (FEM) approach for evaluating Stirling convertor linear alternators. The model extends a magnetostatic analysis previously reported at the 35th Intersociety Energy Conversion Engineering Conference (IECEC) to include the effects of the load current. STC's 55-We linear alternator design was selected to validate the model. Spatial plots of magnetic field strength (H) are presented in the region of the exciting permanent magnets. The margin for permanent magnet demagnetization is calculated at the expected magnet operating temperature for the near earth environment and for various average magnet temperatures. These thermal conditions were selected to represent a worst-case condition for the planned deep space missions. This paper presents plots that identify regions of high H where the potential to alter the magnetic moment of the magnets exists.

  20. The effects of accumulated muscle fatigue on the mechanomyographic waveform: implications for injury prediction.

    PubMed

    Tosovic, D; Than, C; Brown, J M M

    2016-08-01

    Muscle fatigue has been identified as a risk factor for spontaneous muscle injuries in sport. However, few studies have investigated the accumulated effects of muscle fatigue on human muscle contractile properties. This study aimed to determine whether repeated bouts of exercise inducing acute fatigue leads to longer-term fatigue-related changes in muscle contractile properties. Maximum voluntary contraction (MVC), electromyographic (EMG) and mechanomyographic (MMG) measures were recorded in the biceps brachii of 11 participants for 13 days, before and after a maximally fatiguing exercise protocol. The exercise protocol involved participants repetitively lifting a weight (concentric contractions only) equal to 40 % MVC, until failure. A significant (p < 0.05) acute pre- to post-exercise decline of biceps brachii MVC and median power frequency (MPF) was observed each day, whilst no difference existed between pre-exercise MVC or MPF values on subsequent days (days 2-13). However, decreases in number of lift repetitions and in pre-exercise MMG values of muscle belly displacement, contraction velocity and half-relaxation velocity were observed through to day 13. Whilst MVC and MPF measures resolved by the following day's test session, MMG measures indicated an ongoing decrement in muscle performance through days 2-13 consistent with the decline in lift repetitions observed. These results suggest that MMG may be more sensitive in detecting accumulated muscle fatigue than the 'gold standard' measures of MVC/MPF. Considering that muscle fatigue leads to injury, the on-going monitoring of MMG derived contractile properties of muscles in athletes may aid in the prediction of fatigued-induced muscle injury.

  1. PowerFilm PowerShade Fixed Site Solar System Cost Reduction Plan

    DTIC Science & Technology

    2014-07-31

    2337 230’^ St Ames, lA 50014 JL’Olt^lO:pi𔄁oq7 j pageii Executive summary Power film and its partners have developed a Generation II PowerShade...which meets or exceeds the goals of this development contract, increasing power and improving the ROI of the power shade significantly while improving a...number of the human factors. Comparing the Gen II 1.8 KW PowerShade to the equivalent power Gen I unit (Gen I Medium), The cost has been reduced

  2. Preparation for Bargaining: Negotiation and Administration of the Contract.

    ERIC Educational Resources Information Center

    Higginbotham, Richard L.

    Every state will soon have some negotiation law covering school employees. If negotiation is an adversary process between two powers, then there has to be a balance of power between the school board and union. Today unions have more actual and potential power than school management. Unions spend great sums of money preparing for negotiations and…

  3. Medicine: business or profession?

    PubMed

    Zhai, Xiaomei

    2012-06-01

    As professionals, doctors have a contractual relationship with society that trains them and confers on them exclusive power to practice medical care. In the contract, power and responsibility should be balanced. When the power is conferred by society to a profession, the profession should take responsibility for society, including the provision of high quality services, and maintain high standard principled conduct and integrity.

  4. Contracting-out in the United Kingdom: a partnership between social security and private pension plans.

    PubMed

    Daykin, Chris

    2002-01-01

    Contracting-out was introduced in the United Kingdom in 1978 as part of the arrangements for the State Earnings-Related Pension Scheme (SERPS) in order to avoid duplication with the existing well-developed defined benefit occupational pension plan sector. Members and sponsors of contracted-out schemes were able to save on their social security contributions in recognition of the fact that they were accruing equivalent benefits through an occupational pension plan. Later on this concept was extended to those with individual money purchase pension plans. This article considers a brief history of contracting-out, the principles of contracting-out, some problems associated with contracting-out, the implications of the introduction of stakeholder pensions and State Second Pension, and the latest rebate review and rebate orders. It examines how U.K. pensions policy since 1978 has been based on a partnership between social security and private pension plans.

  5. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  6. Capacitively coupled EMG detection via ultra-low-power microcontroller STFT.

    PubMed

    Roland, Theresa; Baumgartner, Werner; Amsuess, Sebastian; Russold, Michael F

    2017-07-01

    As motion artefacts are a major problem with electromyography sensors, a new algorithm is developed to differentiate artefacts to contraction EMG. The performance of myoelectric prosthesis is increased with this algorithm. The implementation is done for an ultra-low-power microcontroller with limited calculation resources and memory. Short Time Fourier Transformation is used to enable real-time application. The sum of the differences (SOD) of the currently measured EMG to a reference contraction EMG is calculated. The SOD is a new parameter introduced for EMG classification. The satisfactory error rates are determined by measurements done with the capacitively coupling EMG prototype, recently developed by the research group.

  7. Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James, Brian David; Huya-Kouadio, Jennie Moton; Houchins, Cassidy

    This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

  8. Performance-Based Services Acquisition

    DTIC Science & Technology

    2011-02-01

    47  DoD’s acquisition workforce lacks training and experience in services contracting ... 47  Selecting correct metrics...services more effectively; vii (2) the DoD’s acquisition workforce lacks training and experience in services contracting; (3) selecting correct...private sector; (2) improve the training of government services acquisition personnel; and (3) the USD(AT&L) should incentivize the existing workforce

  9. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...

  10. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...

  11. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...

  12. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...

  13. 46 CFR 76.23-90 - Installations contracted for prior to November 19, 1952.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... VESSELS FIRE PROTECTION EQUIPMENT Manual Sprinkling System, Details § 76.23-90 Installations contracted...) The details of the system shall be in general agreement with §§ 76.23-5 through 76.23-25 insofar as is reasonable and practicable. Existing piping, pumping facilities, and sprinkler heads or perforated pipes may...

  14. 75 FR 51142 - Self-Regulatory Organizations; Notice of Filing and Immediate Effectiveness of Proposed Rule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... the Commission a proposal to amend Rule 1042 (Exercise of Equity Options Contracts) to extend the cut... 1042 to more clearly present the existing requirements and to eliminate duplicative language.\\4\\ \\3... Advice Rules for Noncash- Settled Equity Option Contracts) is a corresponding Advice to Rule 1042 and is...

  15. The Importance of the Beginning Teachers' Psychological Contract: A Pathway toward Flourishing in Schools

    ERIC Educational Resources Information Center

    Dollansky, Tracy D.

    2014-01-01

    Beginning teachers enter the profession with notions about what their school organization will provide for them and what they will give their organization, in exchange. Psychological contracts, as defined by Schein exist between beginning teachers and their organization. I contend, with the use of a conceptual framework, that if the implicit terms…

  16. An electromechanical actuation system for an expendable launch vehicle

    NASA Technical Reports Server (NTRS)

    Burrows, Linda M.; Roth, Mary E.

    1992-01-01

    A major effort at NASA-Lewis in recent years has been to develop electro-mechanical actuators (EMA's) to replace the hydraulic systems used for thrust vector control (TVC) on launch vehicles. This is an attempt to overcome the inherent inefficiencies and costs associated with the existing hydraulic structures. General Dynamics Space Systems Division, under contract to NASA Lewis, is developing 18.6 kW (25 hp), 29.8 kW (40 hp), and 52.2 kW (70 hp) peak EMA systems to meet the power demands for TVC on a family of vehicles developed for the National Launch System. These systems utilize a pulse population modulated converter and field-oriented control scheme to obtain independent control of both the voltage and frequency. These techniques allow an induction motor to be operated at its maximum torque at all times.

  17. Entry Descent and Landing Workshop Proceedings. Volume 1; Commercial Sources for EDL Flight Tests

    NASA Technical Reports Server (NTRS)

    Trombetta, Nick; Horan, Steve

    2015-01-01

    Commercial Off The Shelf is defined as a Federal Acquisition Regulation (FAR) term for commercial items, including services, available in the commercial marketplace that can be bought and used under government contracts. A need for COTS exists to help in reducing avionics cost associated with applicable missions. In a 2014 a Planetary Science Decadal Survey it was stated that it is imperative that NASA expand its investment in fundamental technology areas. Reduced mass and power requirements for spacecraft and their subsystems. New and improved sensors, instruments, and sampling systems; and Mission and trajectory design and optimization Two goals were written as part of the technology investment: 1. Reducing the cost of planetary missions 2. Improving their scientific capability and reliability...." COTS could certainty aid in reducing cost associated with the instrumentation systems.

  18. Promise, pitfalls of rate reform shown in Vermont experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-03-01

    Both utilities and customers are unhappy with the way existing rate structures are handling rapidly rising fixed plant expenses and operating costs. Results of an experiment by Green Mountain Power in Vermont are discussed. The residential sector one-year study tested six rates: an off-peak rate, an interruptible rate, a peak-kilowatt demand rate, a three-part demand rate, an inverted demand rate, and a contract demand rate. The most successful of the kilowatt-related rates was the peak demand rate, and the most effective rate was probably the interruptible rate. The off-peak rate provided some savings for all who tried it, although theremore » are some who would have lost money in comparison to the conventional rate. The other three rate experiments proved unsuccessful because customers could not adapt to them. (MCW)« less

  19. Disentangling the effects of promised and delivered inducements: relational and transactional contract elements and the mediating role of trust.

    PubMed

    Montes, Samantha D; Irving, P Gregory

    2008-11-01

    Psychological contracts contain both relational and transactional elements, each of which is associated with unique characteristics. In the present research, the authors drew on these distinct qualities to develop and test hypotheses regarding differential employee reactions to underfulfillment, fulfillment, and overfulfillment of relational and transactional promises. Further, the authors extended their test of the theoretical distinctions between relational and transactional contracts by assessing the relevance of trust as a key underlying mechanism of relational and transactional psychological contract breach effects. Participants in this 3-wave longitudinal study included 342 full-time temporary employees. In support of existing theoretical distinctions, results indicated that employees reacted differently to varying levels of fulfillment of their relational and transactional contracts and that trust is a more central mechanism of relational, as opposed to transactional, psychological contract breach effects. These findings underscore L.S. Lambert, J. R. Edwards, and D. M. Cable's (2003) recent recommendation that the traditional conceptualization and study of psychological contract breach requires expansion.

  20. International best practices for negotiating 'reimbursement contracts' with price rebates from pharmaceutical companies.

    PubMed

    Morgan, Steven; Daw, Jamie; Thomson, Paige

    2013-04-01

    Reimbursement contracts, in which health insurers receive rebates from drug manufacturers instead of paying the transparent list price, are becoming increasingly common worldwide. Through interviews with policy makers in nine high-income countries, we describe the use of these contracts around the globe and identify related policy challenges and best practices. Of the nine countries surveyed, the majority routinely use confidential reimbursement contracts. This alternative to drug coverage at list prices offers benefits but is not without challenges. Payers face increased administrative costs, difficulties enforcing contracts, and reduced information about prices paid by others. Among the best practices identified, policy makers recommend establishing clear and consistent processes for negotiating contracts with relatively simple rebate structures and transparency to the public about the existence, purpose, and type of reimbursement contracts in place. Policy makers should also work to address undesirable price disparities within their countries and internationally, which may occur as a result of this new pricing paradigm.

  1. Resolving the problem of compliance with the ever increasing and changing regulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leigh, H.

    1991-06-01

    The most common problem identified at several US Department of Energy (DOE) sites is regulatory compliance. Simply, the project viability depends on identifying regulatory requirements at the beginning of a specific project to avoid possible delays and cost overruns. The Radioisotope Power Systems Facility (RFSP) is using the Regulatory Compliance System (RCS) to deal with the problem that well over 1000 regulatory documents had to be reviewed for possible compliance requirements applicable to the facility. This overwhelming number of possible documents is not atypical of all DOE facilities thus far reviewed using the RCS system. The RCS was developed tomore » provide a control and tracking of all the regulatory and institutional requirements on a given project. WASTREN, Inc., developed the RCS through various DOE contracts and continues to enhance and update the system for existing and new contracts. The RCS provides the information to allow the technical expert to assimilate and manage accurate resource information, compile the checklists, and document that the project or facility fulfills all of the appropriate regulatory requirements. The RCS provides on-line information, including status throughput the project life, thereby allowing more intelligent and proactive decision making. Also, consistency and traceability are provided for regulatory compliance documentation. 1 ref., 1 fig.« less

  2. The contribution of volume, technique, and load to single-repetition and total-repetition kinematics and kinetics in response to three loading schemes.

    PubMed

    Crewther, Blair T; Cronin, John; Keogh, Justin W L

    2008-11-01

    This study examined the effect of volume, technique, and load upon single-repetition and total-repetition kinematics and kinetics during three loading schemes. Eleven recreationally trained males each performed a power (8 sets of 6 repetitions at 45% of one-repetition maximum [1RM], 3-minute rest periods, explosive and ballistic movements), hypertrophy (10 sets of 10 repetitions at 75% 1RM, 2-minute rest periods, controlled movements), and maximal strength (6 sets of 4 repetitions at 88% 1RM, 4-minute rest periods, explosive intent) scheme involving squats. Examination of repetition data showed that load intensity (% 1RM) generally had a direct effect on forces, contraction times, impulses, and work (i.e., increasing with load), whereas power varied across loads (p < 0.001). However, total-repetition forces, contraction times, impulses, work, and power were all greater in the hypertrophy scheme (p < 0.001), because of the greater number of repetitions performed (volume) as well as lifting technique. No differences in total forces were found between the equal-volume power and maximal strength schemes, but the former did produce greater total contraction times, work, and power (p < 0.001), which may also be attributed to repetition and technique differences. Total impulses were the only variable greater in the maximal strength scheme (p < 0.001). Thus, the interaction of load, volume, and technique plays an important role in determining the mechanical responses (stimuli) afforded by these workouts. These findings may explain disparities cited within research, regarding the effectiveness of different loading strategies for hypertrophy, maximal strength, and power adaptation.

  3. Evidence for existence of trunk-limb neural interaction in the corticospinal pathway.

    PubMed

    Sasaki, Atsushi; Milosevic, Matija; Sekiguchi, Hirofumi; Nakazawa, Kimitaka

    2018-03-06

    In humans, trunk muscles have an essential role in postural control as well as walking. However, little is known about the mechanisms of interaction with different muscles, especially related to how trunk muscles interact with the limbs. Contraction of muscles can modulate the corticospinal excitability not only of the contracted muscle, but also of other muscles even in the remote segments of the body. However, "remote effect" mechanism has only been examined for inter-limb interactions. The aim of our current study was to test if there are trunk-limb interactions in the corticospinal pathways. We examined corticospinal excitability of: (a) trunk muscles at rest when hands, legs and jaw muscles were contracted and; (b) hand, leg, and jaw muscles at rest when trunk muscles were contracted. We measured motor evoked potentials elicited using transcranial magnetic stimulation in the rectus abdominis, flexor digitorum superficialis, masseter, tibialis anterior muscles under the following experimental conditions: (1) participants remained relaxed (Rest); (2) during trunk contraction (Trunk); (3) during bilateral hand clenching (Hands); (4) during jaw clenching (Jaw); and (5) during bilateral ankle dorsiflexion (Legs). Each condition was performed at three different stimulation intensities and conditions were randomized between participants. We found that voluntary contraction of trunk muscle facilitated the corticospinal excitability of upper-limb and lower-limb muscles during rest state. Furthermore, voluntary contraction of upper-limb muscle also facilitated the corticospinal excitability of trunk muscles during rest state. Overall, these results suggest the existence of trunk-limb interaction in the corticospinal pathway, which is likely depended on proximity of the trunk and limb representation in the motor cortex. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. Long term contracts, expansion, innovation and stability: North Dakota's lignite mines thrive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchsbaum, L.

    2009-08-15

    North Dakota's lignite coal industry is mainly located in three countries in the central part of the state. Its large surface lignite mines are tied through long-term (20-40 years) contracts to power plants. The article talks about operations at three of the most productive mines - the Freedom mine, Falkirk mine and Center Mine. 4 figs.

  5. Biological Inspiration for Agile Autonomous Air Vehicles

    DTIC Science & Technology

    2007-11-01

    rhythmically contract the thorax; the hind wings have become specialized as small body rotation sensors (halteres). Butterflies and moths have two pairs of...orthogonal pairs of power muscles that produce alternating dorso-ventral and longitudinal flexure of the thorax from rhythmic contractions similar to...other physical sciences lend themselves to somewhat reductionist approaches for both analysis and synthesis. Complex engineered systems are built from

  6. Adverse Impact of the Federal Bankruptcy Law on the Government’s Rights in Relation to the Contractor in Default

    DTIC Science & Technology

    1988-04-01

    and analyze the conflicts between bankruptcy and government contract law . Issues covered include: bankruptcy limitations on the Government’s power to...interview with LTC Billy Smith, Jr., Trial Attorney, Contract Law Division, Office of the Judge Advocate General, U.S. Air Force (November 5, 1987) 53. 11

  7. A Study of Air Force Theater-Based Contingency Contracting Training Requirements for a Power Projection Strategy

    DTIC Science & Technology

    1993-09-01

    Garcia . 4. Duriig base exercises, we pretend to train like we fight. However, because we know that its an exercise, we tend tu just do cnougih to gLt...Tom Wartime Contingency Contracting Handbook Update, Air Force Logistics Management Center, (June 1992b). Rolando , John A. "Is There Going to be a

  8. Reactions to psychological contract breaches and organizational citizenship behaviours: An experimental manipulation of severity.

    PubMed

    Atkinson, Theresa P; Matthews, Russell A; Henderson, Alexandra A; Spitzmueller, Christiane

    2018-01-30

    Grounded in affective events theory, we investigated the effects of experimentally manipulated psychological contract breaches on participants' feelings of violation, subsequent perceptions of psychological contract strength, and organizational citizenship behaviours in a sample of working adults. Results support previous findings that pre-existing relational psychological contract strength interacts with severity of unmet promises or expectations. Specifically, individuals with high relational contracts who experience low severity of unmet promises/expectations have the lowest breach perceptions, whereas individuals with high relational contracts who experience more severe levels unmet promises/expectations experience the highest level of breach perceptions. Results also support the concept of a breach spiral in that prior perceptions of breach led to an increased likelihood of subsequent perceptions of breach following the experimental manipulation. Furthermore, consistent with affective events theory, results support the argument that a psychological contract breach's effect on specific organizational citizenship behaviours is mediated by feelings of violation and the reassessment of relational contracts. These effects were present even after controlling for the direct effects of the manipulated severity of unmet promises/expectations. Copyright © 2018 John Wiley & Sons, Ltd.

  9. Contracts in radiology practices: contract types and key provisions.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-07-01

    A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.

  10. A Project Assessment of Stabilizing System of WT Generation using Rechargeable Battery

    NASA Astrophysics Data System (ADS)

    Kojima, Yasuhiro; Takano, Tomihiro; Tanikawa, Ryoichi; Takagi, Tetsuro; Hirooka, Koutaro; Kumagai, Sadatoshi

    The expansion of the renewable energy introduction is examined as measures for controlling global warming. Wind power generation is expected as effective power resource, but the negative impact from the difficulty of an unstable output is concerned. In recent years, WT generation with contract of cut-of with shorting adjusting power and with rechargeable battery for stabilizing control are examined, but the introduction has not been accelerated yet because there is an influence in WT generation entrepreneur's business. In this paper, we make a brief summary of relation between the fluctuation of wind power generation and stability of electric power operation, and two types of approach; cut-off contract and stabilization using rechargeable battery. For the stabilization using battery, there are two methods, one is reduction control and the other is constant control. We propose a new control method for constant control based on profit optimization considering WT generation forecast and its risk of deviation. We also propose the estimation method for the .limitation of battery installation. Simulation results show the efficiency of our proposed methods.

  11. Age-Associated Changes in the Spectral and Statistical Parameters of Surface Electromyogram of Tibialis Anterior.

    PubMed

    Siddiqi, Ariba; Arjunan, Sridhar Poosapadi; Kumar, Dinesh Kant

    2016-01-01

    Age-related neuromuscular change of Tibialis Anterior (TA) is a leading cause of muscle strength decline among the elderly. This study has established the baseline for age-associated changes in sEMG of TA at different levels of voluntary contraction. We have investigated the use of Gaussianity and maximal power of the power spectral density (PSD) as suitable features to identify age-associated changes in the surface electromyogram (sEMG). Eighteen younger (20-30 years) and 18 older (60-85 years) cohorts completed two trials of isometric dorsiflexion at four different force levels between 10% and 50% of the maximal voluntary contraction. Gaussianity and maximal power of the PSD of sEMG were determined. Results show a significant increase in sEMG's maximal power of the PSD and Gaussianity with increase in force for both cohorts. It was also observed that older cohorts had higher maximal power of the PSD and lower Gaussianity. These age-related differences observed in the PSD and Gaussianity could be due to motor unit remodelling. This can be useful for noninvasive tracking of age-associated neuromuscular changes.

  12. Managed care purchasing under SCHIP: a nationwide analysis of freestanding SCHIP contracts.

    PubMed

    Rosenbaum, S; Shaw, K; Sonosky, C

    2001-12-01

    This Policy Brief is the third in a series that examines the State Children's Health Insurance Program (SCHIP), in particular, those state programs that operate directly under the authority of Title XXI of the Social Security Act rather than as an expansion of Medicaid (or a Medicaid demonstration initiative). This series is designed to examine how states structure and administer insurance programs for low-income children when they elect to administer separate SCHIP plans that exist outside of the requirements and constraints of Medicaid. Understanding how states use their flexibility under "separate SCHIP programs" (as they are termed) has become an increasingly important policy question, in the face of heightened interest on the part of Governors, the Bush Administration, and others in comprehensive Medicaid reform. The first two policy briefs in this series analyzed the entitlement status of separately administered SCHIP programs, as well as issues related to coverage design and the definition of medical necessity. This Policy Brief provides the first nationwide overview of how separate SCHIP programs structure "freestanding" SCHIP managed care contracts, i.e., contracts that exist independently of a state's Medicaid managed care agreements. Fifteen such "freestanding" contracts existed as of Calendar Year 2000, and we report here on their general terms of coverage, access, and care coordination. A forthcoming related study will examine behavioral health care in freestanding SCHIP agreements. Following a brief background and discussion of research methods, we present our principal findings and discuss their implications.

  13. LPT. Low power test (TAN641) interior. Heating and ventilating pneumatic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Low power test (TAN-641) interior. Heating and ventilating pneumatic and electrical control panel. Contract nearly complete. Photographer: Jack L. Anderson. Date: December 19, 1957. INEEL negative no. 57-6198 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  14. Fuel Cell Transit Buses : ThunderPower Bus Evaluation at SunLine Transit Agency

    DOT National Transportation Integrated Search

    2003-11-01

    This report provides an overview of the ThunderPower fuel cell bus demonstration at SunLine Transit Agency in Thousand Palms, California. Under contract with the U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) evaluat...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hennagir, T.

    China's peaking power need continues to drive a highly competitive market for pumped storage turbines. Two contract awards in this growing Far East region have increased visibility of Kvaerner Energy a.s. and Voith Hydro Inc. In October, Kvaerner was awarded a $150 million contract for six 300 MW reversible pump turbines for the 1,800 MW Tianhuangping Pumped Storage Project near Zhejing (Shanghai). The equipment and the contract have been lauded for their significance: The award is the largest of their kind in the world. Voith Hydro's contract to furnish and install four 204 MW pump turbines for the 816 MWmore » Shisanling PUmped Storage Project north of Beijing has drawn attention as well. Not only was the July 1992 contract signing ceremony conducted inside the Great Hall of the People in Beijing, but Chinese Premier Li Peng officiated at the project's groundbreaking ceremony.« less

  16. Mars Technologies Spawn Durable Wind Turbines

    NASA Technical Reports Server (NTRS)

    2014-01-01

    To develop and test wind power technology for use on Mars, Ames Research Center turned to Northern Power Systems (NPS), based in Barre, Vermont. Ames awarded NPS an SBIR contract so the company could enhance their turbine’s function. Today, over 200 NASA-derived Northern Power 100s are in operation on Earth and have reduced carbon emissions by 50,000 tons annually.

  17. Shuttle Engine Designs Revolutionize Solar Power

    NASA Technical Reports Server (NTRS)

    2014-01-01

    The Space Shuttle Main Engine was built under contract to Marshall Space Flight Center by Rocketdyne, now part of Pratt & Whitney Rocketdyne (PWR). PWR applied its NASA experience to solar power technology and licensed the technology to Santa Monica, California-based SolarReserve. The company now develops concentrating solar power projects, including a plant in Nevada that has created 4,300 jobs during construction.

  18. [Psychological contract in the light of flexible employment: The review of studies].

    PubMed

    Żołnierczyk-Zreda, Dorota

    Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  19. Keeping mum about dad: "contracts" to protect gamete donor anonymity.

    PubMed

    Rees, Anne

    2012-06-01

    This article considers the legal status of so-called contracts for anonymity between fertility clinics and donors of gametes that were made in the period before legislation authorising disclosure. It notes that while clinics frequently cite the existence of these "contracts" to argue against retrospective legislation authorising disclosure of the donor's identity, they may be nothing more than one-sided statements of informed consent. However, the article notes that even if an agreement between a donor and a clinic is not contractual, it does not follow that a person conceived through assisted reproductive technology has any right of access to the identity of the donor. The writer has not been able to locate examples of written promises by the clinics promising anonymity. There are written promises by the donors not to seek the identity of the recipients. These promises do not bind the resulting offspring nor do they appear to be supported by consideration. The article suggests that the basis for any individual donor to restrain a clinic from revealing their identity may be found in promissory estoppel. Nevertheless, there is no real issue in Australia concerning clinics revealing these details absent legislative authority. The issue is whether parliaments will legislate to authorise the disclosure. The article notes that it would be rare for parliaments to legislate to overturn existing legal contracts but suggests that the contract argument may not be as strong as has been thought.

  20. 2003 Pacific Northwest Loads and Resources Study.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    2003-12-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determiningmore » BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability for the study period, OY 2005 through 2014. The study shows the Federal system's and the region's expected monthly peak demand, monthly energy demand, monthly peak generating capability, and monthly energy generation for OY 2005, 2009, and 2014. The Federal system and regional monthly capacity surplus/deficit projections are summarized for the 10 operating years of the study period. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.« less

  1. Highly Directive Reflect Array Antenna Design for Wireless Power Transfer

    DTIC Science & Technology

    2017-04-14

    AFRL-AFOSR-JP-TR-2017-0033 Highly Directive Reflect Array Antenna Design for Wireless Power Transfer Siddhartha Prakash Duttagupta INDIAN INSTITUTE...Directive Reflect Array Antenna Design for Wireless Power Transfer 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-14-1-4076 5c.  PROGRAM ELEMENT NUMBER...Antenna Design for Wireless Power Principal Investigator: SP Duttagupta Email: sdgupta@ee.iitb.ac.in Institution: Indian Institute of Technology

  2. 77 FR 49035 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ...; and (iii) establish a fee of $0.10 per contract for NYSE Amex Options Market Maker executions of SPY... than SPY would continue to pay the existing transaction charges, as provided in the Fee Schedule. 2... for SPY options are currently $0.25 per contract, which, when coupled with the proposed $0.10 per...

  3. 7 CFR 623.6 - Transfer of lands from the CRP to the EWRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Transfer of lands from the CRP to the EWRP. 623.6... Transfer of lands from the CRP to the EWRP. Land that is subject to an existing CRP contract administered... requested by the owner and approved by CCC, the CRP contract for the property will be terminated or...

  4. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  5. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  6. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  7. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  8. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  9. Major Current Issues Impacting Government Contracting and Acquisition

    DTIC Science & Technology

    1984-12-01

    22 E . THE OUTLOOK FOR ACQUISITION-----------24 III. COMPETITION IN ACQUISITION--------------30 A. INTRODUCTION--------------------30 B... E . THE EFFECT OF COMPETITION ADVOCACY - - - 50 F. THE COMPETITION IN CONTRACTING ACT OF 1984 ----------------- 53 a. THE FUTURE OF COMPETITION ...plus a reasonable return. Between these two types of market structure, pure competition and monopoly, there exist two other fo, rrs of marketing

  10. Power amplification in an isolated muscle–tendon unit is load dependent

    PubMed Central

    Sawicki, Gregory S.; Sheppard, Peter; Roberts, Thomas J.

    2015-01-01

    ABSTRACT During rapid movements, tendons can act like springs, temporarily storing work done by muscles and then releasing it to power body movements. For some activities, such as frog jumping, energy is released from tendon much more rapidly than it is stored, thus amplifying muscle power output. The period during which energy is loaded into a tendon by muscle work may be aided by a catch mechanism that restricts motion, but theoretical studies indicate that power can be amplified in a muscle–tendon load system even in the absence of a catch. To explore the limits of power amplification with and without a catch, we studied the bullfrog plantaris muscle–tendon during in vitro contractions. A novel servomotor controller allowed us to measure muscle–tendon unit (MTU) mechanical behavior during contractions against a variety of simulated inertial-gravitational loads, ranging from zero to 1× the peak isometric force of the muscle. Power output of the MTU system was load dependent and power amplification occurred only at intermediate loads, reaching ∼1.3× the peak isotonic power output of the muscle. With a simulated anatomical catch mechanism in place, the highest power amplification occurred at the lowest loads, with a maximum amplification of more than 4× peak isotonic muscle power. At higher loads, the benefits of a catch for MTU performance diminished sharply, suggesting that power amplification >2.5× may come at the expense of net mechanical work delivered to the load. PMID:26449973

  11. 12 CFR 7.4007 - Deposit-taking.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Federal law, state laws that obstruct, impair, or condition a national bank's ability to fully exercise... bank may exercise its deposit-taking powers without regard to state law limitations concerning: (i... exercise of national banks' deposit-taking powers: (1) Contracts; (2) Torts; (3) Criminal law; 5 5 But see...

  12. Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

    NASA Technical Reports Server (NTRS)

    1985-01-01

    A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

  13. Advanced teleprocessing systems

    NASA Astrophysics Data System (ADS)

    Kleinrock, L.; Gerla, M.

    1983-09-01

    This Semi-Annual Technical Report covers research carried out by the Advanced Teleprocessing Systems Group at UCLA under DARPA Contract No. MDA 903-82-C-0064 covering the period from April 1, 1983 to September 30, 1983. This contract has three primary designated research areas: packet radio systems, resource sharing and allocation, and distributed processing and control. This report contains the abstracts of the publications which summarize our research results in those areas during this semi-annual period, followed by the main body of the report which consists of the Ph.D. dissertation by H. Richard Gail, "On the Optimization of Computer Network Power', conducted under the supervision of Professor Leonard Kleinrock (Principal Investigator for this contract). It addresses the tradeoff between throughput and delay involving the selection of a suitable operating point for a computer network. This tradeoff is studied through the maximization of various throughput-delay performance measures, all known as power. The models analyzed for the most part are those for a terrestrial wire network.

  14. Government Contract Law Cases.

    DTIC Science & Technology

    1983-10-01

    have no power of supervision or control ere the fact otherwise, we would cease to have a popular nment, but instead would be governed by a group of...article. The principal question presented is appellant’s right to repudiate the contract without liability. The operative questions controlling our...and quality control actions. Paragraph 5 of the document read as follows: THE TRAINING, DOCUMENTATION, SOFTWARE, PACKAGING QUOTED WILL BE DGC

  15. Closed Cycle Electric Discharge Laser Design Investigation

    DTIC Science & Technology

    1978-03-01

    Report Number Assigned by Contract Monitor: NASA CR- 135408 Comments on Document: Archive, RRI, DEW Descriptors, Keywords: Closed Cycle Electric...Discharge Laser Design Investigation Carbon Dioxide Monoxide Space Airborne Heat Disposal Point Track Power Solar Generator Radiation Pages: 00100...Cataloged Date: Nov 27,1992 Contract Number: NAS 3-20100 Document Type: HC Number of Copies In Library: 000001 Record ID: 25219 Source of Document: DEW

  16. The politics of nursing care: correcting deviance in accordance with the social contract.

    PubMed

    O'Byrne, Patrick; Holmes, Dave

    2009-05-01

    Despite numerous theories, models, and philosophies describing what nurses are and what they do, nursing care is often presented as an apolitical process which primarily focuses on patient needs and priorities. However, it is our position that nursing practice-in all regards-is political. To support this argument, we have drawn on works describing of soft/hard power, pastoral power, stigma, deviance, and governmentality, in addition to explaining our institutional social contract conceptualization of politics. In using these concepts, our political perspective reframes nursing practice as a means by which an individual's potential or actual deviance (meaning a deviation from social norms) can be identified and then corrected.

  17. Stirling convertor performance mapping test results

    NASA Astrophysics Data System (ADS)

    Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.

    2002-01-01

    The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .

  18. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    NASA Astrophysics Data System (ADS)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  19. The power transfer from the neuromuscular machinery to its load as a vegetative and somatic behaviour.

    PubMed

    Federici, A; Nocera, L

    1990-01-01

    Models have been proposed in literature describing the contraction of visceral and somatic muscles as an interaction between the time-varying elastances of them and the loads they are working against. The aim of this paper is: 1) to make clear similarities between the models of visceral and somatic muscular contraction; 2) to stress the concept that the power transfer from a time-varying elastance to its load is a behaviour, i.e. an interaction between the entire neuromuscular machinery and the surrounding environment; 3) to propose a theory describing the various physiological and pathological behaviours of both visceral and somatic muscles as different ways of coupling between the time-varying muscular elastances and their loads. In this theory it is assumed that the entire neuromuscular machinery acts as a whole to set the most appropriate power transfer to achieve behavioural goals.

  20. Effects of focal vibration on bone mineral density and motor performance of postmenopausal osteoporotic women.

    PubMed

    Brunetti, O; Botti, F M; Brunetti, A; Biscarini, A; Scarponi, A M; Filippi, G M; Pettorossi, V E

    2015-01-01

    This randomized double blind controlled study is aimed at determining the effect of repeated vibratory stimuli focally applied to the contracted quadriceps muscles (repeated muscle vibration=rMV) on bone mineral density, leg power and balance of postmenopausal osteoporotic women. The study has been conducted on 40 voluntary postmenopausal osteoporotic women, randomised at 2 groups for rMV treatment and for control. The treatment group underwent rMV (100Hz, 300-500 μm; three applications per day, each lasting 10-minutes, for 3 consecutive days) applied to voluntary contracted quadriceps (VC=vibrated and contracted group). The control group, received a sham stimulation on contracted quadriceps (NV=non vibrated group). Bone mineral density T-score of proximal femur of the participants, was evaluated in two weeks before and 360 days after intervention; body balance and explosive leg power were measured 1 day before, 30 days and 360 days after treatment. VC group T-score at one year didn't change significantly relative to baseline values (pretreatment: -2.61±0.11, post-treatment -2.62±0.13); conversely in NV subjects T-score decreased significantly from -2.64 ± 0.15 SD down to -2.99 ± 0.28 SD. A significant improvement of balance and explosive leg power was observed only in VC group at 30 and 360 days after the intervention. We conclude that rMV is a safe, short-lasting and non-invasive treatment that can significantly and persistently improve muscle performance and can effectively counteract progressive demineralisation in postmenopausal and osteoporotic women.

  1. The influence of confounding factors on the relationship between muscle contraction level and MF and MPF values of EMG signal: a review.

    PubMed

    Roman-Liu, Danuta

    2016-01-01

    The purpose of this article is to gather results of studies on the relationship between median frequency (MF) and mean power frequency (MPF) and the level of muscle contraction, and to use those results to discuss the differences in the trends according to factors related to measurement technique and subject. Twenty-one studies with 63 cases for upper limb muscles and nine studies with 31 cases for lower limb muscles were analysed. Most results showed an increase in parameters with an increased level of muscle contraction, only some studies showed a decrease. The influence on parameters of the level of muscle contraction and factors such as subjects, type of contraction, muscle length and electrodes was analysed for each muscle. It was concluded that when analysing the influence of different factors on MF and MPF, because those factors interact they should be considered together, not separately.

  2. 77 FR 68759 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... LLC, BE Rayle LLC, Cedar Brakes I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC, Triton Power Michigan LLC, Utility Contract Funding, L.L.C. Description: JPMorgan Sellers' Notice of Non... that the Commission received the following electric rate filings: Docket Numbers: ER10-1821-003...

  3. 78 FR 4142 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC, Utility Contract Funding, L.L.C... Energy Services, LLC, Champion Energy, LLC. Description: Updated Market Power Analysis for the Southwest... that the Commission received the following electric rate filings: Docket Numbers: ER10-2331-014; ER10...

  4. Modeling and Simulation of an Unmanned Ground Vehicle Power System

    DTIC Science & Technology

    2014-08-07

    Modeling and Simulation of an Unmanned Ground Vehicle Power System John Broderick Jack Hartner Dawn Tilbury Ella Atkins Sponsored by U.S...5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) John Broderick ; Jack Hartner; Dawn Tilbury; Ella Atkins 5d. PROJECT

  5. 18 CFR 1308.31 - Filing and service.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Filing and service. 1308.31 Section 1308.31 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT... opposing party may be made personally or by mail. The copy presented for filing shall bear an appropriate...

  6. 18 CFR 1308.31 - Filing and service.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Filing and service. 1308.31 Section 1308.31 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT... opposing party may be made personally or by mail. The copy presented for filing shall bear an appropriate...

  7. 18 CFR 1308.31 - Filing and service.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Filing and service. 1308.31 Section 1308.31 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT... opposing party may be made personally or by mail. The copy presented for filing shall bear an appropriate...

  8. 18 CFR 1308.31 - Filing and service.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Filing and service. 1308.31 Section 1308.31 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT... opposing party may be made personally or by mail. The copy presented for filing shall bear an appropriate...

  9. 18 CFR 1308.31 - Filing and service.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Filing and service. 1308.31 Section 1308.31 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT... opposing party may be made personally or by mail. The copy presented for filing shall bear an appropriate...

  10. 30 CFR 1206.354 - How do I determine generating deductions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... electricity from the plant tailgate value of the electricity (usually the transmission-reduced value of the...'s-length power plant contract. (b)(1) You must base your generating costs deduction on your actual annual costs associated with the construction and operation of a geothermal power plant. (i) You must...

  11. 18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...

  12. 18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...

  13. 18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...

  14. 18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...

  15. 18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...

  16. Two-wave model of the muscle contraction.

    PubMed

    Molski, Marcin

    2009-05-01

    The Matsuno model of the muscle contraction is considered in the framework of the two-wave Corben's theory of composite objects built up of both time- and space-like components. It has been proved that during muscle contraction the locally coherent aggregates distributed along the actin filament interact by means of space-like fields, which are solutions of the relativistic Feinberg equation. The existence of such interactions and lack of decoherence are conditions sine qua non for appearance of the quantum entanglement between actin monomers in an ATP-activated filament. A possible role of a quantum potential in the muscle contraction is discussed and the mass of the carrier of space-like interactions is estimated m0' = 7.3 x 10(-32) g (46 eV).

  17. Proposal Improvements That Work

    NASA Technical Reports Server (NTRS)

    Dunn, F.

    1998-01-01

    Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

  18. Competitive Cyber-Insurance and Internet Security

    NASA Astrophysics Data System (ADS)

    Shetty, Nikhil; Schwartz, Galina; Felegyhazi, Mark; Walrand, Jean

    This paper investigates how competitive cyber-insurers affect network security and welfare of the networked society. In our model, a user's probability to incur damage (from being attacked) depends on both his security and the network security, with the latter taken by individual users as given. First, we consider cyberinsurers who cannot observe (and thus, affect) individual user security. This asymmetric information causes moral hazard. Then, for most parameters, no equilibrium exists: the insurance market is missing. Even if an equilibrium exists, the insurance contract covers only a minor fraction of the damage; network security worsens relative to the no-insurance equilibrium. Second, we consider insurers with perfect information about their users' security. Here, user security is perfectly enforceable (zero cost); each insurance contract stipulates the required user security. The unique equilibrium contract covers the entire user damage. Still, for most parameters, network security worsens relative to the no-insurance equilibrium. Although cyber-insurance improves user welfare, in general, competitive cyber-insurers fail to improve network security.

  19. A Biophysico-computational Perspective of Breast Cancer Pathogenesis and Treatment Response

    DTIC Science & Technology

    2006-03-01

    of Breast Cancer Pathogenesis and Treatment Response PRINCIPAL INVESTIGATOR: Valerie M. Weaver Ph.D. CONTRACTING...burden for this collection of information is estimated to average 1 hour per response , including the time for reviewing instructions, searching existing...Biophysico-computational Perspective of Breast Cancer Pathogenesis and 5a. CONTRACT NUMBER Treatment Response 5b. GRANT NUMBER W81XWH-05-1-0330 5c

  20. An Analysis of the United States Air Force Energy Savings Performance Contracts

    DTIC Science & Technology

    2007-12-01

    key element of the ESPC system. Chapter IV uses the standard contracting processes to review the USAF implementations of strategic purchasing with...process and each level facilitates regionalization, which is the current implementation method of strategic purchasing for energy service management...the existing regulations that are inconsistent with the ESPC intent , and 3) to formulate substitute regulations consistent with laws governing Federal

  1. Effective Contracting: Trends and Lessons-Learned

    DTIC Science & Technology

    2011-01-25

    present a briefing on their current state of medical contracting; covering trends and lessons- learned from over the past 24 months. Their perspective...basing • Future opportunities in the MHS with a focus on strategic sourcing. • SECDEF guidance 2011 MHS Conference HCAA Mission To provide sound...including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing

  2. The Infernal Business of Contract Cheating: Understanding the Business Processes and Models of Academic Custom Writing Sites

    ERIC Educational Resources Information Center

    Ellis, Cath; Zucker, Ian Michael; Randall, David

    2018-01-01

    While there is growing awareness of the existence and activities of Academic Custom Writing websites, which form a small part of the contract cheating industry, how they work remains poorly understood. Very little research has been done on these sites, probably because it has been assumed that it is impossible to see behind their firewalls and…

  3. Determinants of Service Contract Outcomes

    DTIC Science & Technology

    2011-04-30

    requiring researchers to brief sponsors on project findings as a condition of funding award; “pushing” potentially high- impact research reports (e.g...allocate resources towards those factors that have greater impacts and avoid the inefficient use of resources on those factors that have little or no... impacts . The objective of this research, therefore, is to address existing gaps in the literature and offer service contract practitioners a

  4. Associations between muscle structure and contractile performance in seniors.

    PubMed

    Randhawa, Avleen; Wakeling, James M

    2013-07-01

    Changes in muscle structure due to aging occur in a process known as sarcopenia. These changes can alter muscle mechanics during contraction that may limit mobility in seniors. The purpose of this study was to investigate the effect of sarcopenia on muscle fascicle length, pennation and belly thickness in a contracting muscle during isokinetic movements. Fascicles within a pennate muscle shorten at a slower velocity than that of the muscle belly, in a process called belly gearing. Belly gearing may be affected by atrophy and so was also tested in these seniors. The gastrocnemii were tested using ultrasound from 10 young adults (20-40 years) and 9 seniors (70-85 years). The muscle structure was imaged during standing and maximal plantarflexion at four constant velocities on a dynamometer and torque, position and time were recorded during contractions. The muscle belly thickness and pennation in seniors were significantly lower than young adults during standing. Belly thickness, changes in pennation, the belly gearing, ankle torque and power output were all significantly lower in seniors during plantarflexion contractions of the medial gastrocnemius (MG) and lateral gastrocnemius (LG). The higher pennation observed in young adults is commonly associated with increased fascicle rotations during contraction causing an increased belly gearing. The decreased fascicle rotations in seniors resulted in reduced belly gearing but the size of this effect did not match the loss in strength or power from the muscles. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Canadian policy makers' views on pharmaceutical reimbursement contracts involving confidential discounts from drug manufacturers.

    PubMed

    Morgan, Steven G; Thomson, Paige A; Daw, Jamie R; Friesen, Melissa K

    2013-10-01

    Pharmaceutical policy makers are increasingly negotiating reimbursement contracts that include confidential price terms that may be affected by drug utilization volumes, patterns, or outcomes. Though such contracts may offer a variety of benefits, including the ability to tie payment to the actual performance of a product, they may also create potential policy challenges. Through telephone interviews about this type of contract, we studied the views of officials in nine of ten Canadian provinces. Use of reimbursement contracts involving confidential discounts is new in Canada and ideas about power and equity emerged as cross-cutting themes in our interviews. Though confidential rebates can lower prices and thereby increase coverage of new medicines, several policy makers felt they had little power in the decision to negotiate rebates. Study participants explained that the recent rise in the use of rebates had been driven by manufacturers' pricing tactics and precedent set by other jurisdictions. Several policy makers expressed concerns that confidential rebates could result in inter-jurisdictional inequities in drug pricing and coverage. Policy makers also noted un-insured and under-insured patients must pay inflated "list prices" even if rebates are negotiated by drug plans. The establishment of policies for disciplined negotiations, inter-jurisdictional cooperation, and provision of drug coverage for all citizens are potential solutions to the challenges created by this new pharmaceutical pricing paradigm. Copyright © 2013 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.

  6. [Medical ethics in prison medicine].

    PubMed

    Bernheim, J

    1980-11-01

    A series of situations and decisions involving medical ethics in a prison medical service are discussed. The doctor's independence is considered in relation to his contract with administrative authorities. In contrast with most private doctor-patient relationships, there is usually no possibility for prisoners to choose their doctor and vice-versa. Freedom of consent on the part of the patient may also imply a right to no-treatment. Medical care in prison is not easy to delineate, also because patients often try to involve the doctor in non-medical demands. A prison doctor should avoid taking part in decisions which ought to be made by the judiciary or by administrative authorities. Programmes involving preventive medicine and sociotherapy imply collaboration between therapeutic and security staff. The continuous interplay and readjustment between powers based on public authority, on the rights of each individual prisoner and on the medical programmes makes it possible for some sort of therapeutic freedom to exist in the prison.

  7. Prediction of Binary Nanoparticle Superlattices from Soft Potentials

    NASA Astrophysics Data System (ADS)

    Horst, Nathan; Travesset, Alex

    Driven by the hypothesis that a sufficiently continuous short-ranged potential is able to account for shell flexibility and phonon modes and therefore provides a more realistic description of nanoparticle interactions than a hard sphere model, we compute the solid phase diagram of particles of different radii interacting with an inverse power law potential. We explore 24 candidate lattices where the p-exponent, determining the short-range properties of the potential, is varied between p=12 and p=6, and optimize the free energy with respect to additional internal parameters. The phase diagrams contain the phases found in ongoing self-assembly experiments, including DNA programmable self-assembly and nanoparticles with capping ligands assembled by evaporation from an organic solvent. The resulting phase diagrams can be mapped quantitatively to existing experiments as a function of only two parameters: nanoparticle radius ratio (γ) and softness asymmetry (SA). Supported by DOE under Contract Number DE-AC02-07CH11358.

  8. Expectations and obligations: professionalism and medicine's social contract with society.

    PubMed

    Cruess, Richard L; Cruess, Sylvia R

    2008-01-01

    As health care has become of great importance to both individual citizens and to society, it has become more important to understand medicine's relationship to the society it serves in order to have a basis for meaningful dialogue. During the past decade, individuals in the medical, legal, social sciences, and health policy fields have suggested that professionalism serves as the basis of medicine's relationship with society, and many have termed this relationship a social contract. However, the concept of medicine's social contract remains vague, and the implications of its existence have not been fully explored. This paper endorses the use of the term social contract, examines the origin of the concept and its relationship to professionalism, traces its evolution and application to medicine, describes the expectations of the various parties to the contract, and explores some of the implications of its use.

  9. Dependence of Ca outflow and depression of frog myocardium contraction on ryodipine concentration.

    PubMed

    Narusevicius, E; Gendviliene, V; Macianskiene, R; Hmelj-Dunai, G; Velena, A; Duburs, G

    1988-02-01

    The effect of ryodipine on calcium outflow from tissues, on contraction force, the duration of action potentials and the relaxation phase time-constant in the contraction cycles of myocardial strips was studied using frog heart preparations. It was found that calcium outflow (delta Ca) as a function on ryodipine concentration can be represented as: (formula; see text) A linear correlation exists between Ca2+, contraction blocking and the shortening of the action potential in the presence of various ryodipine concentrations. Ryodipine (10(-5) mol/l) decreased the relaxation time-constant by about 20% as compared to controls. It was concluded that calcium outflow from myocardial tissues in response to ryodipine is due to blockade of calcium entry into the cells and their output through the Na+--Ca2+ exchange system. Frog heart myocardial contractions are essentially under the control of calcium entry through sarcolemmal calcium channels.

  10. Do institutional logics predict interpretation of contract rules at the dental chair-side?

    PubMed Central

    Harris, Rebecca; Brown, Stephen; Holt, Robin; Perkins, Elizabeth

    2014-01-01

    In quasi-markets, contracts find purchasers influencing health care providers, although problems exist where providers use personal bias and heuristics to respond to written agreements, tending towards the moral hazard of opportunism. Previous research on quasi-market contracts typically understands opportunism as fully rational, individual responses selecting maximally efficient outcomes from a set of possibilities. We take a more emotive and collective view of contracting, exploring the influence of institutional logics in relation to the opportunistic behaviour of dentists. Following earlier qualitative work where we identified four institutional logics in English general dental practice, and six dental contract areas where there was scope for opportunism; in 2013 we surveyed 924 dentists to investigate these logics and whether they had predictive purchase over dentists' chair-side behaviour. Factor analysis involving 300 responses identified four logics entwined in (often technical) behaviour: entrepreneurial commercialism, duty to staff and patients, managerialism, public good. PMID:25441320

  11. Contraction et filamentation des decharges micro-ondes entretenues a la pression atmospherique: Application a la detoxication des gaz a effet de serre

    NASA Astrophysics Data System (ADS)

    Kabouzi, Yassine

    The remediation of greenhouse gases, such as perfluorinated compounds (PFCs), constitutes a major environmental concern. Plasmas operating at atmospheric pressure offer an efficient technology for the control of toxic and greenhouse gas emission. The two main objectives of the thesis were to investigate the mechanisms of contraction and filamentation in atmospheric-pressure microwave discharges, and to examine their influence on the plasma abatement process of PFC gases in these discharges. The finite thermal conductivity of the gas discharge is responsible for the gas nonuniform heating leading to a contracted discharge column. The gas thermal conductivity and the penetration depth of the microwave electric field in the plasma are shown to set the value of the plasma radius. The degree of contraction and filamentation of microwave discharges can be controlled, and even reduced, by modulating adequately the incident microwave power. The relaxation times of heat conduction and heat release are actually observed to be of the same magnitude, and correspond to the modulation period for which the discharge shows less contraction. PFC molecules are eliminated through their fragmentation by inelastic collisions with electrons and the subsequent oxidation of these fragments. Reformation of PFC molecules is the main process limiting the abatement efficiency in atmospheric-pressure microwave discharges. As a result of discharge radial contraction, a relative "colder" space between the plasma filament and the discharge tube wall favors PFC reformation and, therefore, lowers the destruction efficiency. The PFC destruction efficiency is found to increase with absorbed microwave power. Surface-wave microwave discharges sustained at atmospheric pressure prove to be an efficient and ecological solution for emission reduction of greenhouse gases.

  12. Diagnostics for Magnetically Driven Implosions on the 1-MA MAIZE Facility

    NASA Astrophysics Data System (ADS)

    Campbell, Paul; Yager-Elorriaga, David; Miller, Stephanie; Woolstrum, Jeff; Jones, Michael; Jordan, Nicholas; Lau, Y. Y.; Gilgenbach, Ronald; McBride, Ryan

    2017-10-01

    The Michigan Accelerator for Inductive Z-pinch Experiments (MAIZE) is a 3-m-diameter Linear Transformer Driver (LTD) at the University of Michigan which supplies a fast electrical pulse (0-1 MA in 100 ns, for matched loads) to various experimental configurations. In order to better investigate these loads, new diagnostics are being developed. First, an EUV/XUV micro-channel plate pinhole camera and a UV laser imaging system are being implemented to better observe the instability structures that form during implosions. Second, an x-pinch radiography diagnostic is being developed to probe deeper into the plasma loads. Third, Rogowski coils are being developed for enhanced load current measurements. Finally, a bolometry system and photo-conducting diamond (PCD) detectors will be implemented to measure x-ray power and energy. These new systems, combined with the existing twelve-frame laser shadowgraphy, and b-dot current monitors, will be powerful tools for the investigation of imploding z-pinch experiments. This research was supported by the DOE through award DE-SC0012328, Sandia National Laboratories contract DE-NA0003525, the National Science Foundation, and a Nuclear Regulatory Commission new-faculty development Grant. D.Y.E. was supported by an NSF fello.

  13. Highly Efficient Small Form Factor LED Retrofit Lamp

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Allen; Fred Palmer; Ming Li

    2011-09-11

    This report summarizes work to develop a high efficiency LED-based MR16 lamp downlight at OSRAM SYLVANIA under US Department of Energy contract DE-EE0000611. A new multichip LED package, electronic driver, and reflector optic were developed for these lamps. At steady-state, the lamp luminous flux was 409 lumens (lm), luminous efficacy of 87 lumens per watt (LPW), CRI (Ra) of 87, and R9 of 85 at a correlated color temperature (CCT) of 3285K. The LED alone achieved 120 lumens per watt efficacy and 600 lumen flux output at 25 C. The driver had 90% electrical conversion efficiency while maintaining excellent powermore » quality with power factor >0.90 at a power of only 5 watts. Compared to similar existing MR16 lamps using LED sources, these lamps had much higher efficacy and color quality. The objective of this work was to demonstrate a LED-based MR16 retrofit lamp for replacement of 35W halogen MR16 lamps having (1) luminous flux of 500 lumens, (2) luminous efficacy of 100 lumens per watt, (3) beam angle less than 40{sup o} and center beam candlepower of at least 1000 candelas, and (4) excellent color quality.« less

  14. Motor unit recruitment and EMG power spectra during ramp contractions of a bifunctional muscle.

    PubMed

    Dupont, L; Gamet, D; Pérot, C

    2000-08-01

    Surface electromyograms (EMGs) were analysed on the short and long head of the biceps brachii (BBSH and BBLH) during single (F and S) or dual (F+S) flexion and supination tasks. It was confirmed, by the analysis of EMG root-mean-square (RMS) values, that the highest activations of BBSH and BBLH were obtained during a maximal dual task. This study was essentially concerned with the analysis of power spectra data obtained during progressive or ramp contractions (RCs). The shape of the power spectra established during the first second of the RCs differs between F, S and F+S tasks. Differences in mean power frequency (MPF) calculated during RCs would be representative of a recruitment of motor units (MUs) that is, at least partly, task-dependent. In order to compare MPF values calculated from RCs performed under different mechanical conditions (F, S and F+S), MPF-RMS(PSD) relationships have been established (RMS(PSD) being defined as the power spectrum density RMS). Both BBSH and BBLH exhibited initial MPF values higher in supination RC than in flexion RC. Because of plateau values reached at the same level of muscle activation whatever the task performed, the slope of the MPF-RMS(PSD) relationship was lower in S than in F. These results are in favour of MU recruitment that is, at least partly, different in F and in S conditions. Dual submaximal tasks seem to mix the activation of the F and S subpopulations of MUs as revealed by the spectral parameters obtained during F+S ramp contractions. This study could find some implication in the field of muscle rehabilitation or reinforcement.

  15. Effects of age and muscle action type on acute strength and power recovery following fatigue of the leg flexors.

    PubMed

    Thompson, Brennan J; Conchola, Eric C; Stock, Matt S

    2015-12-01

    Short-term strength and power recovery patterns following fatigue have received little research attention, particularly as they pertain to age-specific responses, and the leg flexors (i.e., hamstrings) muscle group. Thus, research is warranted addressing these issues because both age-related alterations in the neuromuscular system and mode of muscle action (e.g., eccentric, concentric, isometric) may differentially influence recovery responses from fatigue. The aim of this study was to investigate the strength and power recovery responses for eccentric, concentric, and isometric muscle actions of the leg flexors in young and older men following an isometric, intermittent fatigue-inducing protocol. Nineteen young (age = 25 ± 3 years) and nineteen older (71 ± 4) men performed maximal voluntary contractions (MVCs) for eccentric, concentric, and isometric muscle actions followed by a fatigue protocol of intermittent (0.6 duty cycle) isometric contractions of the leg flexors at 60% of isometric MVC. MVCs of each muscle action were performed at 0, 7, 15, and 30 min following fatigue. Peak torque (PT) and mean power values were calculated from the MVCs and the eccentric/concentric ratio (ECR) was derived. For PT and mean power, young men showed incomplete recovery at all time phases, whereas the older men had recovered by 7 min. Eccentric and isometric muscle actions showed incomplete recovery at all time phases, but concentric recovered by 7 min, independent of age. The ECR was depressed for up to 30 min following fatigue. More rapid and pronounced recovery in older men and concentric contractions may be related to physiological differences specific to aging and muscle action motor unit patterns. Individuals and clinicians may use these time course responses as a guide for recovery following activity-induced fatigue.

  16. Federal Energy Administration's contract with the Advertising Council, Inc. , for a public relations campaign on the need to save energy. Report to the chairman, Subcommittee on Energy and Power, House Committee on Interstate and Foreign Commerce

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is in response to a request for an audit of the Federal Energy Administration's contract with The Advertising Council, Inc., for a public-service advertising campaign on energy conservation. Significant aspects of the audit are summarized in the report's digest.

  17. The application of the psychological contract to workplace safety.

    PubMed

    Walker, Arlene; Hutton, Dorothy M

    2006-01-01

    Psychological contracts of safety are conceptualized as the beliefs of individuals about reciprocal safety obligations inferred from implicit or explicit promises. Although the literature on psychological contracts is growing, the existence of psychological contracts in relation to safety has not been established. The research sought to identify psychological contracts in the conversations of employees about safety, by demonstrating reciprocity in relation to employer and employee safety obligations. The identified safety obligations were used to develop a measure of psychological contracts of safety. The participants were 131 employees attending safety training sessions in retail and manufacturing organizations. Non-participant observation was used to collect the data during safety training sessions. Content analysis was used to analyze the data. Categories for coding were established through identification of language markers that demonstrated contingencies or other implied obligations. Direct evidence of reciprocity between employer safety obligations and employee safety obligations was found in statements from the participants demonstrating psychological contracts. A comprehensive list of perceived employer and employee safety obligations was compiled and developed into a measure of psychological contracts of safety. A small sample of 33 safety personnel was used to validate the safety obligations. CONCLUSIONS AND IMPACT ON INDUSTRY: Implications of these findings for safety and psychological contract research are discussed.

  18. 2006 Pacific Northwest Loads and Resources Study.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    2006-03-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determiningmore » BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of both the Federal system and the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This surplus energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These energy deficits will be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. This study incorporates information on Pacific Northwest (PNW) regional retail loads, contract obligations, and contract resources. This loads and resources analysis simulates the operation of the power system in the PNW. The simulated hydro operation incorporates plant characteristics, streamflows, and non-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were provided by BPA, PNW Federal agency, public agency, cooperative, U.S. Bureau of Reclamation (USBR), and investor-owned utility (IOU) customers furnished through annual PNUCC data submittals for 2005 and/or direct submittals to BPA. The 2006 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2006 White Book analysis updates the 2004 White Book. This analysis shows projections of the Federal system and region's yearly average annual energy consumption and resource availability for the study period, OY 2007-2016. The study also presents projections of Federal system and region expected 1-hour monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY 2007, 2011, and 2016. BPA is investigating a new approach in capacity planning depicting the monthly Federal system 120-hour peak generating capability and 120-hour peak surplus/deficit for OY 2007, 2011, and 2016. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.« less

  19. 48 CFR 27.409 - Solicitation provisions and contract clauses

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... section); (ii) For the acquisition of existing data, commercial computer software, or other existing data... United States (see paragraph (i)(1) of this section); (v) For architect-engineer services or construction... software, use the clause with its Alternate III. Any greater or lesser rights regarding the use...

  20. 48 CFR 27.409 - Solicitation provisions and contract clauses

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... section); (ii) For the acquisition of existing data, commercial computer software, or other existing data... United States (see paragraph (i)(1) of this section); (v) For architect-engineer services or construction... software, use the clause with its Alternate III. Any greater or lesser rights regarding the use...

Top