Sample records for facilities engineering building

  1. 9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  2. 8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  3. 10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  4. 13. Building 105, Facilities Engineering Building, 1830, interior, tin metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 105, Facilities Engineering Building, 1830, interior, tin metal shop area, showing construction of window and part of ceiling, E wall of building. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  5. 14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  6. 6. Historic photo of rocket engine test facility Building 202 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Historic photo of rocket engine test facility Building 202 complex in operation at night, September 12, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45924. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. BUILDING 67 IS SURMISED TO HAVE BEEN A RAILROAD STATION DAYS WHEN SITE WAS A RESORT - National Home for Disabled Volunteer Soldiers, Eastern Branch, 1 VA Center, Augusta, Kennebec County, ME

  8. Facility Focus: Academic and Administrative Buildings.

    ERIC Educational Resources Information Center

    College Planning & Management, 1999

    1999-01-01

    Describes how academic and administrative buildings can be designed to support learning into the next century in the following examples: an applied science an engineering facility; a college greenhouse; and a public affairs classroom building. Photos and floor plans accompany each example. (GR)

  9. 14. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  10. 15. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. 13. Historic drawing of rocket engine test facility layout, including ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic drawing of rocket engine test facility layout, including Buildings 202, 205, 206, and 206A, February 3, 1984. NASA GRC drawing number CF-101539. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS, FUEL ELEMENT CUTTING FACILITY, AND DRY GRAPHITE STORAGE FACILITY. INL DRAWING NUMBER 200-0603-00-030-056329. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. 7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. CAMERA FACING SOUTH. TENT-ROOFED COVER IN RIGHT OF VIEW IS A TEMPORARY WEATHER-PROOFING SHELTER OVER THE BLOWER PIT IN CONNECTION WITH DEMOLITION PROCEDURES. SMALL BUILDING CPP-667 IN CENTER OF VIEW WAS USED FOR SUPPLEMENTARY OFFICE SPACE BY HEALTH PHYSICISTS AND OTHERS. INEEL PROOF SHEET NOT NUMBERED. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  14. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south facade. Camera facing north. High-bay section is pool room. Single-story section at right is control building (TAN-645). Small metal building is post-1970 addition. INEEL negative no. HD-40-7-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Engine Propeller Research Building at the Lewis Flight Propulsion Laboratory

    NASA Image and Video Library

    1955-02-21

    The Engine Propeller Research Building, referred to as the Prop House, emits steam from its acoustic silencers at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. In 1942 the Prop House became the first completed test facility at the new NACA laboratory in Cleveland, Ohio. It contained four test cells designed to study large reciprocating engines. After World War II, the facility was modified to study turbojet engines. Two of the test cells were divided into smaller test chambers, resulting in a total of six engine stands. During this period the NACA Lewis Materials and Thermodynamics Division used four of the test cells to investigate jet engines constructed with alloys and other high temperature materials. The researchers operated the engines at higher temperatures to study stress, fatigue, rupture, and thermal shock. The Compressor and Turbine Division utilized another test cell to study a NACA-designed compressor installed on a full-scale engine. This design sought to increase engine thrust by increasing its airflow capacity. The higher stage pressure ratio resulted in a reduction of the number of required compressor stages. The last test cell was used at the time by the Engine Research Division to study the effect of high inlet densities on a jet engine. Within a couple years of this photograph the Prop House was significantly altered again. By 1960 the facility was renamed the Electric Propulsion Research Building to better describe its new role in electric propulsion.

  16. 23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 3. Plan no. 10,525. Various scales. March 1, 1943, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA

  17. 22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 2. Plan no. 10,525. Various scales. March 1, 1942, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA

  18. Advanced nozzle and engine components test facility

    NASA Technical Reports Server (NTRS)

    Beltran, Luis R.; Delroso, Richard L.; Delrosario, Ruben

    1992-01-01

    A test facility for conducting scaled advanced nozzle and engine component research is described. The CE-22 test facility, located in the Engine Research Building of the NASA Lewis Research Center, contains many systems for the economical testing of advanced scale-model nozzles and engine components. The combustion air and altitude exhaust systems are described. Combustion air can be supplied to a model up to 40 psig for primary air flow, and 40, 125, and 450 psig for secondary air flow. Altitude exhaust can be simulated up to 48,000 ft, or the exhaust can be atmospheric. Descriptions of the multiaxis thrust stand, a color schlieren flow visualization system used for qualitative flow analysis, a labyrinth flow measurement system, a data acquisition system, and auxiliary systems are discussed. Model recommended design information and temperature and pressure instrumentation recommendations are included.

  19. STATION BUILDING. United Engineering Company Ltd., Alameda Shipyard, Ship Repair ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    STATION BUILDING. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plan, elevations, sections, details. Austin Willmott Earl, Consulting Engineer, 233 Sansome Street, San Francisco, California. Drawing no. 504. Various scales. January 20, 1945, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, amendments 4 & 5. blueprint - United Engineering Company Shipyard, Electrical Services & Switching Station, 2900 Main Street, Alameda, Alameda County, CA

  20. Coherent Turbulence Rig in the Engine Research Building

    NASA Image and Video Library

    1979-08-21

    An engineer examines the Coherent Turbulence Rig in the Engine Research Building at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Coherent turbulence occurs when waves of uniform size and alignment are present in airflow. Researchers at NASA Lewis were interested in determining the relation between the size of the waves and their heat transfer properties. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities.

  1. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  2. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  3. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  4. LPT. Shield test facility test building interior (TAN646). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera facing south. Distant pool contained EBOR reactor; near pool was intended for fuel rod storage. Other post-1970 activity equipment remains in pool. INEEL negative no. HD-40-9-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  5. LPT. Shield test facility test building interior (TAN646). Camera points ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera points down into interior of north pool. Equipment on wall is electronical bus used for post-1970 experiment. Personnel ladder at right. INEEL negative no. HD-40-9-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  6. A&M. Jet engine test building (TAN609). Exterior. Equipment inside rollup ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Jet engine test building (TAN-609). Exterior. Equipment inside roll-up door is blowdown test facility, part of loft-semiscale program. Note width of central section serving as blast protection for operator on left side. Photographer: Cahoon. Date: July 22, 1965. INEEL negative no. 65-3703 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  7. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south end of EBOR helium wing. Camera facing north. Monorail protrudes from upper-level door. Rust marks on concrete wall are from stack. Metal shed is post-1970 addition. INEEL negative no. HD-40-8-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  8. 57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT SOUTHEAST SIDE. NOTE ESCAPE CHUTES PROJECTING FROM SIDES OF BUILDING. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  9. 11. BUILDING NO. 18 (ENGINEERING BUILDING), CENTER, IN RELATION TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. BUILDING NO. 18 (ENGINEERING BUILDING), CENTER, IN RELATION TO BUILDING NO. 19 (BENDING SHOP AND OVEN) AT FAR LEFT, AND TO THE WET BASIN AT FAR RIGHT. VIEW TO NORTH-NORTHWEST. - United Engineering Company Shipyard, 2900 Main Street, Alameda, Alameda County, CA

  10. LPT. Shield test facility assembly and test building (TAN646). East ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646). East facade of ebor helium wing addition. Camera facing west. Note asbestos-cement siding on stair enclosure and upper-level. Concrete siding at lower level. Metal stack. Monorail protrudes from upper level of south wall at left of view. INEEL negative no. HD-40-7-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  11. 62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING AT NORTHWEST FACADE. ACCESS TO ROOF ALLOWS MAINTENANCE OF VENTILATION EQUIPMENT WHICH IS PLACED OUTSIDE BUILDING TO MINIMIZE EXPLOSION HAZARD. NO. 2 VISIBLE ON WALL OF BUILDING STANDS FOR EXPLOSION HAZARD WITH FRAGMENTATION. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  12. 63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, LOOKING SOUTHEAST DOWN SCREENED WALKWAY ON NORTHWEST SIDE. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  13. Facilities Engineering in NASA

    NASA Technical Reports Server (NTRS)

    Pagluiso, M. A.

    1970-01-01

    An overview of NASA facilities is given outlining some of the more interesting and unique aspects of engineering and facilities associated with the space program. Outlined are some of the policies under which the Office of Facilities conducts its business. Included are environmental quality control measures.

  14. Alleviation of Facility/Engine Interactions in an Open-Jet Scramjet Test Facility

    NASA Technical Reports Server (NTRS)

    Albertson, Cindy W.; Emami, Saied

    2001-01-01

    Results of a series of shakedown tests to eliminate facility/engine interactions in an open-jet scramjet test facility are presented. The tests were conducted with the NASA DFX (Dual-Fuel eXperimental scramjet) engine in the NASA Langley Combustion Heated Scramjet Test Facility (CHSTF) in support of the Hyper-X program, The majority of the tests were conducted at a total enthalpy and pressure corresponding to Mach 5 flight at a dynamic pressure of 734 psf. The DFX is the largest engine ever tested in the CHSTF. Blockage, in terms of the projected engine area relative to the nozzle exit area, is 81% with the engine forebody leading edge aligned with the upper edge of the facility nozzle such that it ingests the nozzle boundary layer. The blockage increases to 95% with the engine forebody leading edge positioned 2 in. down in the core flow. Previous engines successfully tested in the CHSTF have had blockages of no more than 51%. Oil flow studies along with facility and engine pressure measurements were used to define flow behavior. These results guided modifications to existing aeroappliances and the design of new aeroappliances. These changes allowed fueled tests to be conducted without facility interaction effects in the data with the engine forebody leading edge positioned to ingest the facility nozzle boundary layer. Interaction effects were also reduced for tests with the engine forebody leading edge positioned 2 in. into the core flow, however some interaction effects were still evident in the engine data. A new shroud and diffuser have been designed with the goal of allowing fueled tests to be conducted with the engine forebody leading edge positioned in the core without facility interaction effects in the data. Evaluation tests of the new shroud and diffuser will be conducted once ongoing fueled engine tests have been completed.

  15. Wright R–2600–8 Engine in the Engine Propeller Research Building

    NASA Image and Video Library

    1943-03-21

    A Wright Aeronautical R–2600 Cyclone piston engine installed in the Engine Propeller Research Building, or Prop House, at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory. The R–2600 was among the most powerful engines that emerged during World War II. The engine, which was developed for commercial applications in 1939, was used to power the North American B–25 bomber and several other midsize military aircraft. The higher altitudes required by the military caused problems with the engine's cooling and fuel systems. The military requested that the Aircraft Engine Research Laboratory analyze the performance of the R–2600, improve its cooling system, and reduce engine knock. The NACA researchers subjected the engine to numerous tests in its Prop House. The R–2600 was the subject of the laboratory's first technical report, which was written by members of the Fuels and Lubricants Division. The Prop House contained soundproof test cells in which piston engines and propellers were mounted and operated at high powers. Electrically driven fans drew air through ducts to create a stream of cooling air over the engines. Researchers tested the performance of fuels, turbochargers, water-injection and cooling systems here during World War II. The facility was also investigated a captured German V–I buzz bomb during the war.

  16. 9. Interior, original Boiler and Engine Room, Engine Stores Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Interior, original Boiler and Engine Room, Engine Stores Building, Southern Pacific Railroad Carlin Shops, view to south (90mm lens). Note the roof truss system and built-up iron longitudinal roof girders. - Southern Pacific Railroad, Carlin Shops, Engine Stores Building, Foot of Sixth Street, Carlin, Elko County, NV

  17. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2010-01-01

    The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. An engineering unit, the ASRG engineering unit (EU), was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently under extended operation test at the NASA Glenn Research Center (GRC) to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for the ASRG EU. This paper summarizes details of the test facility design, including the mechanical mounting, heat-rejection system, argon system, control systems, and maintenance. The effort proceeded from requirements definition through design, analysis, build, and test. Initial testing and facility performance results are discussed.

  18. MINIMUM AREAS FOR ELEMENTARY SCHOOL BUILDING FACILITIES.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Public Instruction, Harrisburg.

    MINIMUM AREA SPACE REQUIREMENTS IN SQUARE FOOTAGE FOR ELEMENTARY SCHOOL BUILDING FACILITIES ARE PRESENTED, INCLUDING FACILITIES FOR INSTRUCTIONAL USE, GENERAL USE, AND SERVICE USE. LIBRARY, CAFETERIA, KITCHEN, STORAGE, AND MULTIPURPOSE ROOMS SHOULD BE SIZED FOR THE PROJECTED ENROLLMENT OF THE BUILDING IN ACCORDANCE WITH THE PROJECTION UNDER THE…

  19. [Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].

    PubMed

    Lee, Geauchul

    2016-04-01

    This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.

  20. Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee

    DTIC Science & Technology

    2006-02-01

    BuildingEngine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration BuildingEngine Test Facility ( ETF )-B Exhauster • ETF -A

  1. Jake Garn Mission Simulator and Training Facility, Building 5, Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Trish; Deming, Joan

    2010-01-01

    astronaut training facility. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 5 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 5 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are also provided.

  2. 45. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH BUILDING METAL SIDING BEING APPLIED ON "A" FACE (LEFT) AND "B" FACE (RIGHT). NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D&D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D&D plans for the turbine building were prepared from 1979 through 1990. D&D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and the absence of loosemore » contamination, the D&D activities were completed with no radiation exposure to the workers. The D&D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  4. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D D plans for the turbine building were prepared from 1979 through 1990. D D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and themore » absence of loose contamination, the D D activities were completed with no radiation exposure to the workers. The D D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  5. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  6. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  7. Research Support Facility (RSF): Leadership in Building Performance (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This brochure/poster provides information on the features of the Research Support Facility including a detailed illustration of the facility with call outs of energy efficiency and renewable energy technologies. Imagine an office building so energy efficient that its occupants consume only the amount of energy generated by renewable power on the building site. The building, the Research Support Facility (RSF) occupied by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) employees, uses 50% less energy than if it were built to current commercial code and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED{reg_sign})more » Platinum rating. With 19% of the primary energy in the U.S. consumed by commercial buildings, the RSF is changing the way commercial office buildings are designed and built.« less

  8. This photographic copy of an engineering drawing shows floor plans, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  9. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  11. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  12. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  14. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. The Influence of Building Codes on Recreation Facility Design.

    ERIC Educational Resources Information Center

    Morrison, Thomas A.

    1989-01-01

    Implications of building codes upon design and construction of recreation facilities are investigated (national building codes, recreation facility standards, and misperceptions of design requirements). Recreation professionals can influence architectural designers to correct past deficiencies, but they must understand architectural and…

  16. Central Control Room in the Engine Research Building

    NASA Image and Video Library

    1968-11-21

    Operators in the Engine Research Building’s Central Control Room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. The panels on the wall contain schematics with indicator lights and instrumentation for the atmospheric exhaust, altitude exhaust, refrigerated air, and process air systems. The process air equipment included twelve exhausters, four compressors, refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  17. 1. Distant view shows Engine Room Building behind cranes. Retort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Distant view shows Engine Room Building behind cranes. Retort rings in foreground were once located in Engine Room Building. See photo WA-131-A-2. Building on left is Machine Shop. Boiler Building is in front of stack. - Pacific Creosoting Plant, Engine Room Building, 5350 Creosote Place, Northeast, Bremerton, Kitsap County, WA

  18. Test Stand at the Rocket Engine Test Facility

    NASA Image and Video Library

    1973-02-21

    The thrust stand in the Rocket Engine Test Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center in Cleveland, Ohio. The Rocket Engine Test Facility was constructed in the mid-1950s to expand upon the smaller test cells built a decade before at the Rocket Laboratory. The $2.5-million Rocket Engine Test Facility could test larger hydrogen-fluorine and hydrogen-oxygen rocket thrust chambers with thrust levels up to 20,000 pounds. Test Stand A, seen in this photograph, was designed to fire vertically mounted rocket engines downward. The exhaust passed through an exhaust gas scrubber and muffler before being vented into the atmosphere. Lewis researchers in the early 1970s used the Rocket Engine Test Facility to perform basic research that could be utilized by designers of the Space Shuttle Main Engines. A new electronic ignition system and timer were installed at the facility for these tests. Lewis researchers demonstrated the benefits of ceramic thermal coatings for the engine’s thrust chamber and determined the optimal composite material for the coatings. They compared the thermal-coated thrust chamber to traditional unlined high-temperature thrust chambers. There were more than 17,000 different configurations tested on this stand between 1973 and 1976. The Rocket Engine Test Facility was later designated a National Historic Landmark for its role in the development of liquid hydrogen as a propellant.

  19. Building Air Quality: A Guide for Building Owners and Facility Managers.

    ERIC Educational Resources Information Center

    Agle, Elizabeth; Galbraith, Susan

    The past two decades have witnessed increased concerns over the health and comfort of indoor air quality (IAQ), but little indoor air-related information has been targeted at building owners and facility managers of public and commercial buildings. This manual, specifically created for such a population, provides guidance on preventing,…

  20. 46. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH ALL METAL SIDING INSTALLED AND WITH EMITTER/ANTENNA ARRAY SYSTEM NEARING OCMPLETION ON "B" FACE (RIGHT). VIEW ALSO SHOWS TRAVELING "CLEANING" SYSTEM ON "B" FACE - NOW REMOVED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. Engine component instrumentation development facility at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Bruckner, Robert J.; Buggele, Alvin E.; Lepicovsky, Jan

    1992-01-01

    The Engine Components Instrumentation Development Facility at NASA Lewis is a unique aeronautics facility dedicated to the development of innovative instrumentation for turbine engine component testing. Containing two separate wind tunnels, the facility is capable of simulating many flow conditions found in most turbine engine components. This facility's broad range of capabilities as well as its versatility provide an excellent location for the development of novel testing techniques. These capabilities thus allow a more efficient use of larger and more complex engine component test facilities.

  2. A Facilities Manager's Guide to Green Building Design.

    ERIC Educational Resources Information Center

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  3. 12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. ENGINE TEST CELL BUILDING INTERIOR. DETAIL OF CONTROL CONSOLE FOR ENGINE TEST CELL 4. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  4. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. Building inclusive engineering identities: implications for changing engineering culture

    NASA Astrophysics Data System (ADS)

    Atadero, Rebecca A.; Paguyo, Christina H.; Rambo-Hernandez, Karen E.; Henderson, Heather L.

    2018-05-01

    Ongoing efforts to broaden the participation of women and people of colour in engineering degree programmes and careers have had limited success. This paper describes a different approach to broadening participation that seeks to work with all students and develop inclusive engineering identities. Researchers worked with the instructors of two first-year engineering courses to integrate curriculum activities designed to promote the formation of engineering identities and build an appreciation for how diversity and inclusion strengthen engineering practice. Multilevel modelling results indicated positive effects of the intervention on appreciation for diversity but no effects on engineering identity, and qualitative results indicated students learned the most about diversity not through one of the intervention activities, but through team projects in the courses. We also describe lessons learned in how to teach engineering students about diversity in ways that are relevant to engineering.

  6. Evaluating building performance in healthcare facilities: an organizational perspective.

    PubMed

    Steinke, Claudia; Webster, Lynn; Fontaine, Marie

    2010-01-01

    Using the environment as a strategic tool is one of the most cost-effective and enduring approaches for improving public health; however, it is one that requires multiple perspectives. The purpose of this article is to highlight an innovative methodology that has been developed for conducting comprehensive performance evaluations in public sector health facilities in Canada. The building performance evaluation methodology described in this paper is a government initiative. The project team developed a comprehensive building evaluation process for all new capital health projects that would respond to the aforementioned need for stakeholders to be more accountable and to better integrate the larger organizational strategy of facilities. The Balanced Scorecard, which is a multiparadigmatic, performance-based business framework, serves as the underlying theoretical framework for this initiative. It was applied in the development of the conceptual model entitled the Building Performance Evaluation Scorecard, which provides the following benefits: (1) It illustrates a process to link facilities more effectively to the overall mission and goals of an organization; (2) It is both a measurement and a management system that has the ability to link regional facilities to measures of success and larger business goals; (3) It provides a standardized methodology that ensures consistency in assessing building performance; and (4) It is more comprehensive than traditional building evaluations. The methodology presented in this paper is both a measurement and management system that integrates the principles of evidence-based design with the practices of pre- and post-occupancy evaluation. It promotes accountability and continues throughout the life cycle of a project. The advantage of applying this framework is that it engages health organizations in clarifying a vision and strategy for their facilities and helps translate those strategies into action and measurable performance

  7. Design-Build Process for the Research Support Facility (RSF) (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-06-01

    An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.

  8. Building Blueprints: Making Music.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Depicts how Cornell University renovated its civil engineering and architecture building to include space for musical performances, teaching, and rehearsals. The article highlights the facility's contemporary design, which also compliments the form and massing of the original building. (GR)

  9. 2. REAR ELEVATION OF ENGINE TEST CELL BUILDING. LOOKING SOUTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. REAR ELEVATION OF ENGINE TEST CELL BUILDING. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  10. 1. West facade of Plutonium Concentration Facility (Building 233S), ReductionOxidation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West facade of Plutonium Concentration Facility (Building 233-S), Reduction-Oxidation Building (REDOX-202-S) to the right. Looking east. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  11. VIEW OF BUILDING 122 WHICH HOUSES THE ONSITE MEDICAL FACILITIES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 WHICH HOUSES THE ON-SITE MEDICAL FACILITIES OF THE ROCKY FLATS PLANT AND THE OCCUPATIONAL HEALTH AND INTERNAL DOSIMETRY ORGANIZATIONS. EMERGENCY MEDICAL SERVICES, DIAGNOSIS, DECONTAMINATION, FIRST AID, X-RAY, MINOR SURGICAL TREATMENT, AND AMBULATORY ACTIVITIES ARE CARRIED OUT IN THIS BUILDING. (1/98) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  12. Ground test facility for SEI nuclear rocket engines

    NASA Astrophysics Data System (ADS)

    Harmon, Charles D.; Ottinger, Cathy A.; Sanchez, Lawrence C.; Shipers, Larry R.

    1992-07-01

    Nuclear (fission) thermal propulsion has been identified as a critical technology for a manned mission to Mars by the year 2019. Facilities are required that will support ground tests to qualify the nuclear rocket engine design, which must support a realistic thermal and neutronic environment in which the fuel elements will operate at a fraction of the power for a flight weight reactor/engine. This paper describes the design of a fuel element ground test facility, with a strong emphasis on safety and economy. The details of major structures and support systems of the facility are discussed, and a design diagram of the test facility structures is presented.

  13. 7. This photographic copy of an engineering drawing displays the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA

  14. 14. ENGINE TEST CELL BUILDING ROOF. VENTILATION AND COOLING TOWERS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. ENGINE TEST CELL BUILDING ROOF. VENTILATION AND COOLING TOWERS. LOOKING EAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  15. 10. ENGINE TEST CELL BUILDING INTERIOR. CELL 4, MOUNTING STAND. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. ENGINE TEST CELL BUILDING INTERIOR. CELL 4, MOUNTING STAND. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  16. Performance-based seismic design of nonstructural building components: The next frontier of earthquake engineering

    NASA Astrophysics Data System (ADS)

    Filiatrault, Andre; Sullivan, Timothy

    2014-08-01

    With the development and implementation of performance-based earthquake engineering, harmonization of performance levels between structural and nonstructural components becomes vital. Even if the structural components of a building achieve a continuous or immediate occupancy performance level after a seismic event, failure of architectural, mechanical or electrical components can lower the performance level of the entire building system. This reduction in performance caused by the vulnerability of nonstructural components has been observed during recent earthquakes worldwide. Moreover, nonstructural damage has limited the functionality of critical facilities, such as hospitals, following major seismic events. The investment in nonstructural components and building contents is far greater than that of structural components and framing. Therefore, it is not surprising that in many past earthquakes, losses from damage to nonstructural components have exceeded losses from structural damage. Furthermore, the failure of nonstructural components can become a safety hazard or can hamper the safe movement of occupants evacuating buildings, or of rescue workers entering buildings. In comparison to structural components and systems, there is relatively limited information on the seismic design of nonstructural components. Basic research work in this area has been sparse, and the available codes and guidelines are usually, for the most part, based on past experiences, engineering judgment and intuition, rather than on objective experimental and analytical results. Often, design engineers are forced to start almost from square one after each earthquake event: to observe what went wrong and to try to prevent repetitions. This is a consequence of the empirical nature of current seismic regulations and guidelines for nonstructural components. This review paper summarizes current knowledge on the seismic design and analysis of nonstructural building components, identifying major

  17. 2. ROCKET ENGINE TEST STAND, SHOWING TANK (BUILDING 1929) AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. ROCKET ENGINE TEST STAND, SHOWING TANK (BUILDING 1929) AND GARAGE (BUILDING 1930) AT LEFT REAR. Looking to west. - Edwards Air Force Base, X-15 Engine Test Complex, Rocket Engine & Complete X-15 Vehicle Test Stands, Rogers Dry Lake, east of runway between North Base & South Base, Boron, Kern County, CA

  18. 8. ENGINE TEST CELL BUILDING INTERIOR. LONGITUDINAL CENTRAL PASSAGEWAY IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. ENGINE TEST CELL BUILDING INTERIOR. LONGITUDINAL CENTRAL PASSAGEWAY IN BASEMENT. LOOKING SOUTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  19. 5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN FLOOR. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  20. 15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED CA. 1975. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  1. 4. FRONT FACADE OF ENGINE TEST CELL BUILDING. DETAIL OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. FRONT FACADE OF ENGINE TEST CELL BUILDING. DETAIL OF MAIN ENTRY. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  2. 6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON BASEMENT LEVEL. LOOKING WEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  3. 3. FRONT FACADE OF ENGINE TEST CELL BUILDING. VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. FRONT FACADE OF ENGINE TEST CELL BUILDING. VIEW OF NORTHEAST WING. LOOKING WEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  4. 9. Historic construction view of Building 100. 1956. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic construction view of Building 100. 1956. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. 11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  6. 13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  7. 7. ENGINE TEST CELL BUILDING INTERIOR. WALL MAP IN CENTRAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. ENGINE TEST CELL BUILDING INTERIOR. WALL MAP IN CENTRAL BASEMENT OFFICE AREA. LOOKING SOUTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  8. 9. ENGINE TEST CELL BUILDING INTERIOR. CELL ACCESS ELEVATOR, CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. ENGINE TEST CELL BUILDING INTERIOR. CELL ACCESS ELEVATOR, CELLS 2 AND 4, BASEMENT LEVEL. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  9. Performance evaluation of the Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Jensen, R. N.

    1981-01-01

    The general performance of the NASA Solar Building Test Facility (SBTF) and its subsystems and components over a four year operational period is discussed, and data are provided for a typical one year period. The facility consists of a 4645 sq office building modified to accept solar heated water for operation of an absorption air conditioner and a baseboard heating system. An adjoining 1176 sq solar flat plate collector field with a 114 cu tank provides the solar heated water. The solar system provided 57 percent of the energy required for heating and cooling on an annual basis. The average efficiency of the solar collectors was 26 percent over a one year period.

  10. VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE AND SUBCONTRACTOR PHYSICAL EXAMINATIONS. (10/85) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  11. ENGINEERING TEST REACTOR (ETR) BUILDING, TRA642. CONTEXTUAL VIEW, CAMERA FACING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ENGINEERING TEST REACTOR (ETR) BUILDING, TRA-642. CONTEXTUAL VIEW, CAMERA FACING EAST. VERTICAL METAL SIDING. ROOF IS SLIGHTLY ELEVATED AT CENTER LINE FOR DRAINAGE. WEST SIDE OF ETR COMPRESSOR BUILDING, TRA-643, PROJECTS TOWARD LEFT AT FAR END OF ETR BUILDING. INL NEGATIVE NO. HD46-37-1. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  12. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  13. 7. Historic aerial photo of rocket engine test facility complex, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Historic aerial photo of rocket engine test facility complex, June 1962. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-60674. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. 9. Historic aerial photo of rocket engine test facility complex, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic aerial photo of rocket engine test facility complex, June 11, 1965. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-65-1270. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 10. Historic photo of rendering of rocket engine test facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Historic photo of rendering of rocket engine test facility complex, April 28, 1964. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-69472. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. 8. Historic aerial photo of rocket engine test facility complex, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic aerial photo of rocket engine test facility complex, June 11, 1965. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-65-1271. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. Systems Engineering Building Advances Power Grid Research

    ScienceCinema

    Virden, Jud; Huang, Henry; Skare, Paul; Dagle, Jeff; Imhoff, Carl; Stoustrup, Jakob; Melton, Ron; Stiles, Dennis; Pratt, Rob

    2018-01-16

    Researchers and industry are now better equipped to tackle the nation’s most pressing energy challenges through PNNL’s new Systems Engineering Building – including challenges in grid modernization, buildings efficiency and renewable energy integration. This lab links real-time grid data, software platforms, specialized laboratories and advanced computing resources for the design and demonstration of new tools to modernize the grid and increase buildings energy efficiency.

  18. Interior view of the Descanso Station engine garage, building no. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior view of the Descanso Station engine garage, building no. 2304 facing east. Photograph taken from the elevated position on the west end of the building, detail of the roof structure. - Descanso Ranger Station, Engine Garage, 24321 Viejas Grade Road, Descanso, San Diego County, CA

  19. 17. Interior oblique view, original Cooper's Shop, Engine Stores Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Interior oblique view, original Cooper's Shop, Engine Stores Building, Southern Pacific Railroad Carlin Shops, view to southeast (90mm lens). Note the original window and sealed doorway. - Southern Pacific Railroad, Carlin Shops, Engine Stores Building, Foot of Sixth Street, Carlin, Elko County, NV

  20. 32. Historic view of Building 202 test stand A with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Historic view of Building 202 test stand A with rocket engine, close-up detail of engine, November 19, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-46492. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  1. 76 FR 63913 - Commercial Building Workforce Job/Task Analyses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability...-commissioning authority, energy/sustainability manager, facility manager, and/or operating engineer/building...

  2. Nanotechnology on a dime: building affordable research facilities

    NASA Astrophysics Data System (ADS)

    DiBattista, Jeff; Clare, Donna; Lynch, David

    2005-08-01

    Designing buildings to house nanotechnology research presents a multitude of well-recognized challenges to architectural and engineering design teams, from environmental control to spatial arrangements to operational functionality. These technical challenges can be solved with relative ease on projects with large budgets: designers have the option of selecting leading-edge systems without undue regard for their expense. This is reflected in the construction cost of many nanotechnology research facilities that run well into the hundreds of millions of dollars. Smaller universities and other institutions need not be shut out of the nanotechnology research field simply because their construction budgets are tens of millions of dollars or less. The key to success for these less expensive projects lies with making good strategic decisions: identifying priorities for the facility in terms of what it will is--and will not--provide to the researchers. Making these strategic decisions puts bounds on the tactical, technical problems that the design team at large must address, allowing them to focus their efforts on the key areas for success. The process and challenges of this strategic decision-making process are examined, with emphasis placed on the types of decisions that must be made and the factors that must be considered when making them. Case study examples of projects undertaken at the University of Alberta are used to illustrate how strategic-level decision-making sets the stage for cutting-edge success on a modest budget.

  3. Panorama, section 2 of 3, note the Operations Building (Facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Panorama, section 2 of 3, note the Operations Building (Facility 294) in the center of facility, view facing west - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  4. 36. Historic photo of Building 202 interior, shows shop area ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Historic photo of Building 202 interior, shows shop area with engineers assembling twenty-thousand-pound-thrust rocket engine, December 15, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-49343. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. 49. Historic photo of Building 202 test cell interior, test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Historic photo of Building 202 test cell interior, test stand A with engineer examining damage to test engine, October 21, 1966. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-66-4064. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. 40. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Historic photo of Building 202 test cell interior, with engineers working on rocket engine mounted on test stand A, June 26, 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-51026. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. 22. Post Engineer Office, Presidio of San Francisco, Building # ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Post Engineer Office, Presidio of San Francisco, Building # 1049 Letterman General Hospital. Alterations to EKG Cardiology Clinic. November 1963. BUILDING 1049. - Presidio of San Francisco, Letterman General Hospital, Building No. 12, Letterman Hospital Complex, Edie Road, San Francisco, San Francisco County, CA

  8. 4. Engine Stores Building, Southern Pacific Railroad Carlin Shops, oblique ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Engine Stores Building, Southern Pacific Railroad Carlin Shops, oblique view of the southwest end and southeast side (135mm lens). Condemned freight cars spotted on the adjacent track prevented clear photography of southeast side. - Southern Pacific Railroad, Carlin Shops, Engine Stores Building, Foot of Sixth Street, Carlin, Elko County, NV

  9. 3. Engine Stores Building, Southern Pacific Railroad Carlin Shops, oblique ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Engine Stores Building, Southern Pacific Railroad Carlin Shops, oblique view of the northeast end and southeast side (90mm lens). Condemned freight cars spotted on the adjacent track prevented clear photography of southeast side. - Southern Pacific Railroad, Carlin Shops, Engine Stores Building, Foot of Sixth Street, Carlin, Elko County, NV

  10. 50. Historic photo of Building 202 test cell interior, closeup ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Historic photo of Building 202 test cell interior, closeup of test stand A, with engineer examining damage to test engine, October 21, 1966. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-66-4063. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. 13. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. 55. Room BF9, paper shredding facility, basement level, building 500, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Room BF-9, paper shredding facility, basement level, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE

  13. Code JEF Facilities Engineering Home Page for the Internet

    NASA Technical Reports Server (NTRS)

    Mahaffey, Valerie A.; Harrison, Marla J. (Technical Monitor)

    1995-01-01

    There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.

  14. 38. Historic photo of Building 202 test cell interior, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Historic photo of Building 202 test cell interior, showing damage to test stand A and rocket engine after failure and explosion of engine, December 12, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-49376. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 110. ARAI support facilities. Index of drawings related to initial ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    110. ARA-I support facilities. Index of drawings related to initial construction of hot cell building ARA-626, shop and maintenance building ARA-627, and other buildings at ARA-I. Date: Circa January 1959. Norman Engineering Company. Ineel index code no. 068-9999-80-613-102703. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  16. SLS Engine Section Test Article Loaded on Barge Pegasus at NASA's Michoud Assembly Facility

    NASA Image and Video Library

    2017-04-27

    A NASA move team loaded the engine section structural qualification test article for the Space Launch System into the barge Pegasus docked in the harbor at NASA's Michoud Assembly Facility in New Orleans. The rocket's engine section is the bottom of the core stage and houses the four RS-25 engines. The engine section test article was moved from Building 103, Michoud’s 43-acre rocket factory, to the barge where it was loaded for a river trip to NASA’s Marshall Space Flight Center in Huntsville, Alabama. The bottom part of the test article is structurally the same as the engine section that will be flown as part of the SLS core stage. The shiny metal top part simulates the rocket's liquid hydrogen tank, which is the fuel tank that joins to the engine section. The barge Pegasus will travel 1,240 miles by river to Marshall and endure tests that pull, push, and bend it, subjecting it to millions of pounds of force. This ensures the structure can withstand the incredible stresses produced by the 8.8 million pounds of thrust during launch and ascent.

  17. An inventory of aeronautical ground research facilities. Volume 4: Engineering flight simulation facilities

    NASA Technical Reports Server (NTRS)

    Pirrello, C. J.; Hardin, R. D.; Capelluro, L. P.; Harrison, W. D.

    1971-01-01

    The general purpose capabilities of government and industry in the area of real time engineering flight simulation are discussed. The information covers computer equipment, visual systems, crew stations, and motion systems, along with brief statements of facility capabilities. Facility construction and typical operational costs are included where available. The facilities provide for economical and safe solutions to vehicle design, performance, control, and flying qualities problems of manned and unmanned flight systems.

  18. HOT CELL BUILDING, TRA632. CONTEXTUAL VIEW ALONG WALLEYE AVENUE, CAMERA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HOT CELL BUILDING, TRA-632. CONTEXTUAL VIEW ALONG WALLEYE AVENUE, CAMERA FACING EASTERLY. HOT CELL BUILDING IS AT CENTER LEFT OF VIEW; THE LOW-BAY PROJECTION WITH LADDER IS THE TEST TRAIN ASSEMBLY FACILITY, ADDED IN 1968. MTR BUILDING IS IN LEFT OF VIEW. HIGH-BAY BUILDING AT RIGHT IS THE ENGINEERING TEST REACTOR BUILDING, TRA-642. INL NEGATIVE NO. HD46-32-1. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. 13. View northeast of boiler plant (Building 39), engineering work ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. View northeast of boiler plant (Building 39), engineering work order building/former tin shop (Building 129), laundry MAT workshop (Building 28), pipe shop/former water softening plant (Building 81), paint spray shop/former blacksmith shop (Building 95), fuel oil storage tank building (Building 103), mason's shop (Building 77), and carpenter shop (Building 97) with steel water tank (Building 124) in background - National Home for Disabled Volunteer Soldiers Western Branch, 4101 South Fourth Street, Leavenworth, Leavenworth County, KS

  20. 21. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, RAMP DETAILS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  1. 20. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, ELEVATIONS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  2. 31. Historic view of Building 202 test stand A with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Historic view of Building 202 test stand A with rocket engine, November 19, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-46491. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. Building Information Modeling (BIM) Primer. Report 1: Facility Life-Cycle Process and Technology Innovation

    DTIC Science & Technology

    2012-08-01

    Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a

  4. Fan Noise Test Facility

    NASA Image and Video Library

    1969-01-21

    The Fan Noise Test Facility built at the Lewis Research Center to obtain far-field noise data for the National Aeronautics and Space Administration (NASA) and General Electric Quiet Engine Program. The engine incorporated existing noise reduction methods into an engine of similar power to those that propelled the Boeing 707 or McDonnell-Douglas DC-8 airliner. The new the low-bypass ratio turbofan engines of the 1960s were inherently quieter than their turbojet counterparts, researchers had a better grasp of the noise generation problem, and new acoustic technologies had emerged. Lewis contracted General Electric in 1969 to build and aerodynamically test three experimental engines with 72-inch diameter fans. The engines were then brought to Lewis and tested with an acoustically treated nacelle. This Fan Noise Test Facility was built off of the 10- by 10-Foot Supersonic Wind Tunnel’s Main Compressor and Drive Building. Lewis researchers were able to isolate the fan’s noise during these initial tests by removing the core of the engine. The Lewis test rig drove engines to takeoff tip speeds of 1160 feet per second. The facility was later used to test a series of full-scale model fans and fan noise suppressors to be used with the quiet engine. NASA researchers predicted low-speed single-stage fans without inlet guide vanes and with large spacing between rotors and stators would be quieter. General Electric modified a TF39 turbofan engine by removing the the outer protion of the fan and spacing the blade rows of the inner portion. The tests revealed that the untreated version of the engine generated less noise than was anticipated, and the acoustically treated nacelle substantially reduced engine noise.

  5. 23. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, UPPER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  6. 22. Photocopy of engineering drawing, April 10, 1958 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, LOWER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  7. An overview of game-based learning in building services engineering education

    NASA Astrophysics Data System (ADS)

    Alanne, Kari

    2016-03-01

    To ensure proper competence development and short graduation times for engineering students, it is essential that the study motivation is encouraged by new learning methods. In game-based learning, the learner's engagement is increased and learning is made meaningful by applying game-like features such as competition and rewarding through virtual promotions or achievement badges. In this paper, the state of the art of game-based learning in building services engineering education at university level is reviewed and discussed. A systematic literature review indicates that educational games have been reported in the field of related disciplines, such as mechanical and civil engineering. The development of system-level educational games that realistically simulate work life in building services engineering is still in its infancy. Novel rewarding practices and more comprehensive approaches entailing the state-of-the-art information tools such as building information modelling, geographic information systems, building management systems and augmented reality are needed in the future.

  8. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  9. 56. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. Historic photo of excavation work at Building 202, shows facility with exhaust scrubber in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-712. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  10. 55. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Historic photo of excavation work at Building 202, shows facility with detention tank in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-711. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. Management engineering (building no. 4), looking west along Porter Avenue. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Management engineering (building no. 4), looking west along Porter Avenue. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Management Engineering, League Island, Philadelphia, Philadelphia County, PA

  12. Providing security for automated process control systems at hydropower engineering facilities

    NASA Astrophysics Data System (ADS)

    Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.

    2016-12-01

    This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.

  13. 36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  14. 34. Historic photo of Building 202 test cell with damage ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Historic photo of Building 202 test cell with damage from fire or explosion during rocket engine testing, May 17, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-47965. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 54. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. Historic photo of Building 202 test cell interior, with engine mounted on test stand A, September 13, 1967. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-67-3274. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. 52. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Historic photo of Building 202 test cell interior, with engine mounted on test stand A, May 18, 1967 On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-67-1740. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. Cleaner, More Efficient Diesel Engines

    ScienceCinema

    Musculus, Mark

    2018-01-16

    Mark Musculus, an engine combustion scientist at Sandia National Laboratories, led a study that outlines the science base for auto and engine manufacturers to build the next generation of cleaner, more efficient engines using low-temperature combustion. Here, Musculus discusses the work at Sandia's Combustion Research Facility.

  18. Steam Plant at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1945-09-21

    The Steam Plant at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory supplies steam to the major test facilities and office buildings. Steam is used for the Icing Research Tunnel's spray system and the Engine Research Building’s desiccant air dryers. In addition, its five boilers supply heat to various buildings and the cafeteria. Schirmer-Schneider Company built the $141,000 facility in the fall of 1942, and it has been in operation ever since.

  19. 37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. 45. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Historic photo of Building 202 test cell interior, with engine mounted on test stand A. Close-up view of a twenty-thousand-pound-thrust engine being tested in relation with combustion oscillation studies, October 12, 1960. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-54595. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  1. 51. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Historic photo of Building 202 test cell interior, with longablative rocket engine mounted on test stand A, May 18, 1967. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-66-4084. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  2. 46. Historic photo of Building 202 test cell interior, detail ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Historic photo of Building 202 test cell interior, detail of test stand A with engine severely damaged during testing, September 7, 1961. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-57837. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. 47. Historic photo of Building 202 test cell interior, test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Historic photo of Building 202 test cell interior, test stand A with technician working on zone injector engine, June 3, 1996. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-66-2396. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  4. 37. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Historic photo of Building 202 test cell interior, with damage related to hydrogen fire during rocket engine testing, April 25, 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-50473. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. 1. EXTERIOR OF BUILDING 402, CIVIL ENGINEERING STORAGE, LOOKING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OF BUILDING 402, CIVIL ENGINEERING STORAGE, LOOKING SOUTH. - Mill Valley Air Force Station, Civil Engineering Storage, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA

  6. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  7. Dragonfly: strengthening programming skills by building a game engine from scratch

    NASA Astrophysics Data System (ADS)

    Claypool, Mark

    2013-06-01

    Computer game development has been shown to be an effective hook for motivating students to learn both introductory and advanced computer science topics. While games can be made from scratch, to simplify the programming required game development often uses game engines that handle complicated or frequently used components of the game. These game engines present the opportunity to strengthen programming skills and expose students to a range of fundamental computer science topics. While educational efforts have been effective in using game engines to improve computer science education, there have been no published papers describing and evaluating students building a game engine from scratch as part of their course work. This paper presents the Dragonfly-approach in which students build a fully functional game engine from scratch and make a game using their engine as part of a junior-level course. Details on the programming projects are presented, as well as an evaluation of the results from two offerings that used Dragonfly. Student performance on the projects as well as student assessments demonstrates the efficacy of having students build a game engine from scratch in strengthening their programming skills.

  8. 12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) (1992). - Wright-Patterson Air Force Base, Area B, Buildings 25 & 24,10-foot & 20-foot Wind Tunnel Complex, Northeast side of block bounded by K, G, Third, & Fifth Streets, Dayton, Montgomery County, OH

  9. 35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  10. 1. Context view of Building 205, showing hydrogen tanks in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Context view of Building 205, showing hydrogen tanks in foreground and Building 202 exhaust scrubber stack in background. View looking southwest from top of mound east of Building 205. - Rocket Engine Testing Facility, GRC Building No. 205, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. Small engine components test facility compressor testing cell at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Brokopp, Richard A.; Gronski, Robert S.

    1992-01-01

    LeRC has designed and constructed a new test facility. This facility, called the Small Engine Components Facility (SECTF) is used to test gas turbines and compressors at conditions similar to actual engine conditions. The SECTF is comprised of a compressor testing cell and a turbine testing cell. Only the compressor testing cell is described. The capability of the facility, the overall facility design, the instrumentation used in the facility, and the data acquisition system are discussed in detail.

  12. Vice President Pence Visits SLS Engineering Test Facility

    NASA Image and Video Library

    2017-09-25

    The Vice President toured the SLS engineering facility where the engine section of the rocket’s massive core stage is undergoing a major stress test. The rocket’s four RS-25 engines and the two solid rocket boosters that attach to the SLS engine section will produce more than 8 million pounds of thrust to launch the Orion spacecraft beyond low-Earth orbit. More than 3,000 measurements using sensors installed on the test section will help ensure the core stage for all SLS missions can withstand the extreme forces of flight.

  13. 13. Building 202 exhaust scrubber water detention tank, looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 202 exhaust scrubber water detention tank, looking southeast from bed of Abram Creek. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. 3. Southeast corner of Building 202, looking northwest from steps ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southeast corner of Building 202, looking northwest from steps on hillside near water tank. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 1. EXTERIOR OF CIVIL ENGINEERING MAINTENANCE SHOP, BUILDING 103, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR OF CIVIL ENGINEERING MAINTENANCE SHOP, BUILDING 103, LOOKING NORTH. - Mill Valley Air Force Station, Civil Engineering Maintenance Shop, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA

  16. 44. Historic photo of interior of Building 202 test cell, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Historic photo of interior of Building 202 test cell, showing rocket engine on test stand and camera set up for filming tests, September 1960. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-54464. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 39. Historic photo of Building 202 test cell exterior, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Historic photo of Building 202 test cell exterior, showing fiberglass cladding blown out by hydrogen fire during rocket engine testing, April 27, 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-50472. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. 11. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  19. 35. Historic photo of Building 202 test stand with damage ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Historic photo of Building 202 test stand with damage to twenty-thousand-pound-thrust rocket engine related to failure during testing, September 16, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-48704. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  20. 15. SITE BUILDING 004 ELECTRIC POWER STATION VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. SITE BUILDING 004 - ELECTRIC POWER STATION - VIEW IS LOOKING SOUTH 55° EAST AT FIVE DIESEL ENGINE/ GENERATOR SILENCER SYSTEM EXHAUST STACKS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. Seismic risk management of non-engineered buildings

    NASA Astrophysics Data System (ADS)

    Winar, Setya

    Earthquakes have long been feared as one of nature's most terrifying and devastating events. Although seismic codes clearly exist in countries with a high seismic risk to save lives and human suffering, earthquakes still continue to cause tragic events with high death tolls, particularly due to the collapse of widespread non-engineered buildings with non-seismic resistance in developing countries such as Indonesia. The implementation of seismic codes in non-engineered construction is the key to ensuring earthquake safety. In fact, such implementation is not simple, because it comprises all forms of cross disciplinary and cross sectoral linkages at different levels of understanding, commitment, and skill. This fact suggests that a widely agreed framework can help to harmonise the various perspectives. Hence, this research is aimed at developing an integrated framework for guiding and monitoring seismic risk reduction of non-engineered buildings in Indonesia via a risk management method.Primarily, the proposed framework for the study has drawn heavily on wider literature, the three existing frameworks around the world, and on the contribution of various stakeholders who participated in the study. A postal questionnaire survey, selected interviews, and workshop event constituted the primary data collection methods. As a robust framework needed to be achieved, the following two workshop events, which were conducted in Yogyakarta City and Bengkulu City in Indonesia, were carried out for practicality, validity, and moderation or any identifiable improvement requirements. The data collected was analysed with the assistance of SPSS and NVivo software programmes.This research found that the content of the proposed framework comprises 63 pairs of characteristic-indicators complemented by (a) three important factors of effective seismic risk management of non-engineered buildings, (b) three guiding principles for sustainable dissemination to the grass root communities and (c

  2. 20. Building 202, detail of stand A, rocket test stand ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Building 202, detail of stand A, rocket test stand in test cell. View looking southeast. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. Confirmatory radiological survey of the BORAX-V turbine building Idaho National Engineering Laboratory, Idaho Falls, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevens, G.H.; Coleman, R.L.; Jensen, M.K.

    1993-07-01

    An independent assessment of the remediation of the BORAX-V (Boiling Water Reactor Experiment) turbine building at the Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho, was accomplished by the Oak Ridge National Laboratory Pollutant Assessments Group (ORNL/PAG). The purpose of the assessment was to confirm the site`s compliance with applicable Department of Energy guidelines. The assessment included reviews of both the decontamination and decommissioning Plan and data provided from the pre- and post-remedial action surveys and an independent verification survey of the facility. The independent verification survey included determination of background exposure rates and soil concentrations, beta-gamma and gamma radiationmore » scans, smears for detection of removable contamination, and direct measurements for alpha and beta-gamma radiation activity on the basement and mezzanine floors and the building`s interior and exterior walls. Soil samples were taken, and beta-gamma and gamma radiation exposure rates were measured on areas adjacent to the building. Results of measurements on building surfaces at this facility were within established contamination guidelines except for elevated beta-gamma radiation levels located on three isolated areas of the basement floor. Following remediation of these areas, ORNL/PAG reviewed the remedial action contractor`s report and agreed that remediation was effective in removing the source of the elevated direct radiation. Results of all independent soil analyses for {sup 60}Co were below the detection limit. The highest {sup 137}Cs analysis result was 4.6 pCi/g; this value is below the INEL site-specific guideline of 10 pCi/g.« less

  4. An inventory of aeronautical ground research facilities. Volume 2: Air breathing engine test facilities

    NASA Technical Reports Server (NTRS)

    Pirrello, C. J.; Hardin, R. D.; Heckart, M. V.; Brown, K. R.

    1971-01-01

    The inventory covers free jet and direct connect altitude cells, sea level static thrust stands, sea level test cells with ram air, and propulsion wind tunnels. Free jet altitude cells and propulsion wind tunnels are used for evaluation of complete inlet-engine-exhaust nozzle propulsion systems under simulated flight conditions. These facilities are similar in principal of operation and differ primarily in test section concept. The propulsion wind tunnel provides a closed test section and restrains the flow around the test specimen while the free jet is allowed to expand freely. A chamber of large diameter about the free jet is provided in which desired operating pressure levels may be maintained. Sea level test cells with ram air provide controlled, conditioned air directly to the engine face for performance evaluation at low altitude flight conditions. Direct connect altitude cells provide a means of performance evaluation at simulated conditions of Mach number and altitude with air supplied to the flight altitude conditions. Sea level static thrust stands simply provide an instrumented engine mounting for measuring thrust at zero airspeed. While all of these facilities are used for integrated engine testing, a few provide engine component test capability.

  5. 53. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. Historic photo of Building 202 test cell interior, with engine mounted on test stand A, showing surrounding fuel and oxidant delivery systems and instruments, May 18, 1967. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-67-1739. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. 48. Historic photo of Building 202 test cell interior, test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Historic photo of Building 202 test cell interior, test stand A with zone injector engine; technician is working on equipment panel in foreground, June 3, 1966. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-66-2397. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. 57. Historic photo of interior of test cell at Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. Historic photo of interior of test cell at Building 202, showing test stand A with engine and D.T. support ring, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69--3187. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. 16. View of Building 100 control room. 1987. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  9. Engineering properties of douglas-fir lumber reclaimed from deconstructed buildings

    Treesearch

    Robert Falk; Derek Maul; Steven Cramer; James Evans; Victoria Herian

    2008-01-01

    A vast wood resource exists in our Nation's wood-framed building infrastructure. As the buildings in this infrastructure age and are remodeled or removed for redevelopment, the wood framing residing in these buildings has the potential to be recovered for reuse. However, little technical information exists on the residual engineering properties of reclaimed...

  10. Building Specifications

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank

  11. 11. EASTERN EDGE OF POST ENGINEER'S SHOPS AND YARD BUILDINGS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. EASTERN EDGE OF POST ENGINEER'S SHOPS AND YARD BUILDINGS, WITH BUILDING 283 ON RIGHT, LOOKING 186 DEGREES SOUTH. - Presidio of San Francisco, Warehouse & Auto Shop, Crissy Field North cantonment, San Francisco, San Francisco County, CA

  12. 38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. 8. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: SECTIONS AND DETAILS, 1971. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  14. 17. Building 202, observation room for test cell, showing panel, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Building 202, observation room for test cell, showing panel, abort button, phones, and observation window. View looking northwest. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  16. A Team Building Model for Software Engineering Courses Term Projects

    ERIC Educational Resources Information Center

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  17. 14. Photocopy of engineering drawing, Buildings 28 and 28A: Steam ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of engineering drawing, Buildings 28 and 28A: Steam Heating System, 1918 (original on file with the Norfolk Naval Shipyard, Portsmouth, Virginia) - Norfolk Naval Shipyard, Building No. 28A, Adjoining Buildings No. 28 & 29 on Shubrick & Breeze Streets, Portsmouth, Portsmouth, VA

  18. 7. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: ELEVATIONS, FLOOR AND FOUNDATION PLANS, 1971. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  19. FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  20. 6. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: MONUMENT LOCATION AND LINE-OF-SIGHT PLAN, 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  1. Environmental practices for biomedical research facilities.

    PubMed Central

    Medlin, E L; Grupenhoff, J T

    2000-01-01

    As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360

  2. Photocopy of photograph (original print located at Engineering Management Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of photograph (original print located at Engineering Management Building, Naval Shipyard, Long Beach). Navy Photograph, July 4, 1942, Photograph #2226. BUILDING 40, WITH MAIN GATE 1 - Roosevelt Base, Gatehouse, Corner of Ocean Boulevard & Gate 1, Long Beach, Los Angeles County, CA

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  4. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  5. A free-piston Stirling engine/linear alternator controls and load interaction test facility

    NASA Technical Reports Server (NTRS)

    Rauch, Jeffrey S.; Kankam, M. David; Santiago, Walter; Madi, Frank J.

    1992-01-01

    A test facility at LeRC was assembled for evaluating free-piston Stirling engine/linear alternator control options, and interaction with various electrical loads. This facility is based on a 'SPIKE' engine/alternator. The engine/alternator, a multi-purpose load system, a digital computer based load and facility control, and a data acquisition system with both steady-periodic and transient capability are described. Preliminary steady-periodic results are included for several operating modes of a digital AC parasitic load control. Preliminary results on the transient response to switching a resistive AC user load are discussed.

  6. Requirements Engineering in Building Climate Science Software

    ERIC Educational Resources Information Center

    Batcheller, Archer L.

    2011-01-01

    Software has an important role in supporting scientific work. This dissertation studies teams that build scientific software, focusing on the way that they determine what the software should do. These requirements engineering processes are investigated through three case studies of climate science software projects. The Earth System Modeling…

  7. 17. Historic plan of Building 100. June 29, 1955. NASA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Historic plan of Building 100. June 29, 1955. NASA GRC drawing number CE-101441. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. 9. Historic plan drawing of Building 205, July 1978. NASA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic plan drawing of Building 205, July 1978. NASA GRC Drawing no. CC-18263. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 205, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  9. OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING (FIRST-FLOOR CONCRETE PORTION) IN FOREGROUND. - U.S. Naval Base, Pearl Harbor, Combat Intelligence Center, Makalapa Drive in Makalapa Administration Area, Pearl City, Honolulu County, HI

  10. 21. Historic section drawing of Building 100. June 29, 1955. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Historic section drawing of Building 100. June 29, 1955. NASA GRC drawing number CE-101444. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. 4. Anode Building. View is to the east. This facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Anode Building. View is to the east. This facility, which was used for the cleaning and manufacture of anodes, was documented prior to demolition in 1993. - Sullivan Electrolytic Zinc Plant, Government Gulch, Kellogg, Shoshone County, ID

  12. Development of a Simplified Sustainable Facilities Guide

    DTIC Science & Technology

    2003-04-18

    Government Through Efficient Energy Management , June 3, 1999 EO 13148 Greening the Government Through Leadership in Environmental Management ...architects, engineers, and project managers . - The United States Green Building Council (USGBC) has created the " Leadership in Energy and...SIMPLIFIED SUSTAINABLE FACILITIES GUIDE THESIS Presented to the Faculty Department of Systems and Engineering Management

  13. NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

    NASA Technical Reports Server (NTRS)

    Snoddy, Jimmy R.

    2006-01-01

    In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system

  14. 18. Historic plan of Building 100 control room. March 21, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Historic plan of Building 100 control room. March 21, 1956. NASA GRC drawing number CE-101736. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 10. Historic exterior view of Building 100. August 22, 1957. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Historic exterior view of Building 100. August 22, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45766. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. 22. Construction view of Building 202, 1956. On file at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Construction view of Building 202, 1956. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-171D-1956. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 60. Historic plan of Building 202 exhaust scrubber, June 18, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. Historic plan of Building 202 exhaust scrubber, June 18, 1955. NASA GRC drawing no. CD-101261. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. Flow Quality for Turbine Engine Loads Simulator (TELS) Facility

    DTIC Science & Technology

    1980-06-01

    2.2 GAS INGESTION A mathematical simulation of the turbojet engine and jet deflector was formulated to estimate the severity of the recirculating...3. Swain. R. L. and Mitchell, J. G. "’Smlulatlon of Turbine Engine Operational Loads." Journal of Aircraft Vol. 15, No. 6, June 1978• 4. Ryan, J...3 AEDC-TR-79-83 ~...~ i ,i g - Flow Quality for Turbine Engine Loads Simulator (TELS) Facility R..I. Schulz ARO, Inc. June 1980

  19. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  20. Building Pressure: Modeling the Fiscal Future of California K-12 School Facilities

    ERIC Educational Resources Information Center

    Jain, Liz S.; Vincent, Jefrey M.

    2016-01-01

    Public school districts across California, particularly those in low-wealth areas, experience significant funding shortfalls for their facilities. Industry benchmarks suggest the state's K-12 school districts should spend nearly $18 billion a year to maintain their inventory, ensure buildings are up-to-date, and to build new spaces to handle…

  1. Applying the design-build-test paradigm in microbiome engineering.

    PubMed

    Pham, Hoang Long; Ho, Chun Loong; Wong, Adison; Lee, Yung Seng; Chang, Matthew Wook

    2017-12-01

    The recently discovered roles of human microbiome in health and diseases have inspired research efforts across many disciplines to engineer microbiome for health benefits. In this review, we highlight recent progress in human microbiome research and how modifications to the microbiome could result in implications to human health. Furthermore, we discuss the application of a 'design-build-test' framework to expedite microbiome engineering efforts by reviewing current literature on three key aspects: design principles to engineer the human microbiome, methods to engineer microbiome with desired functions, and analytical techniques to examine complex microbiome samples. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. 10. Photocopy of drawing, February 1958, NUCLEAR REACTOR FACILITY, STRUCTURAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of drawing, February 1958, NUCLEAR REACTOR FACILITY, STRUCTURAL CROSS SECTION. Giffals & Vallet, Inc., L. Rosetti, Associated Architects and Engineers, Detroit, Michigan; and U.S. Army Engineer Division, New England Corps of Engineers, Boston, Massachusetts. Drawing Number 35-84-04. (Original: AMTL Engineering Division, Watertown). - Watertown Arsenal, Building No. 100, Wooley Avenue, Watertown, Middlesex County, MA

  3. A Versatile Rocket Engine Hot Gas Facility

    NASA Technical Reports Server (NTRS)

    Green, James M.

    1993-01-01

    The capabilities of a versatile rocket engine facility, located in the Rocket Laboratory at the NASA Lewis Research Center, are presented. The gaseous hydrogen/oxygen facility can be used for thermal shock and hot gas testing of materials and structures as well as rocket propulsion testing. Testing over a wide range of operating conditions in both fuel and oxygen rich regimes can be conducted, with cooled or uncooled test specimens. The size and location of the test cell provide the ability to conduct large amounts of testing in short time periods with rapid turnaround between programs.

  4. Test results and facility description for a 40-kilowatt stirling engine

    NASA Technical Reports Server (NTRS)

    Kelm, G. G.; Cairelli, J. E.; Walter, R. J.

    1981-01-01

    A 40 kilowatt Stirling engine, its test support facilities, and the experimental procedures used for these tests are described. Operating experience with the engine is discussed, and some initial test results are presented

  5. 29. Historic view of twentythousandpound rocket test stand with engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Historic view of twenty-thousand-pound rocket test stand with engine installation in test cell of Building 202, September 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45870. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. 21. Building 202, underside of test stand A, detail of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Building 202, underside of test stand A, detail of junction of scrubber structure and test stand with water pipes and valves visible. View looking southeast. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. 8. Historic plan, section, elevation, and detail drawing of Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Historic plan, section, elevation, and detail drawing of Building 206, August 26, 1968. NASA GRC drawing number CE-101188 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 206, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. 23. Construction view of Building 202 test cell, 1956. On ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Construction view of Building 202 test cell, 1956. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-952D-1956. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  9. 20. Historic south and west elevation drawing of Building 100. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Historic south and west elevation drawing of Building 100. June 29, 1955. NASA GRC drawing number CE-101443. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  10. 62. Historic propellant piping diagram of oxidant pit at Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. Historic propellant piping diagram of oxidant pit at Building 202, January 6, 1956. NASA GRC drawing no. CF-101644. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  11. 19. Historic north and east elevation drawing of Building 100. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Historic north and east elevation drawing of Building 100. June 29, 1955. NASA GRC drawing number CE-101442. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. 24. Historic view of Building 202 scrubber stack, August 1957. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Historic view of Building 202 scrubber stack, August 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-952D-1956. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. 27. Historic view of Building 202 exhaust scrubber stack, July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Historic view of Building 202 exhaust scrubber stack, July 31, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45650. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. 61. Historic elevation and section drawing of Building 202 exhaust ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. Historic elevation and section drawing of Building 202 exhaust scrubber, July 18, 1955. NASA GRC drawing no. CD-101263. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 33. Historic photo of section diagram of Building 202, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Historic photo of section diagram of Building 202, April 30, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-47807. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. 59. Historic elevation and detail drawing of Building 202 test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Historic elevation and detail drawing of Building 202 test cell, June 29, 1955. NASA GRC drawing no. CE-101341 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  17. 42. Historic photo of exterior of Building 202 test cell, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Historic photo of exterior of Building 202 test cell, January 26, 1960. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-52534. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. Scoping the parameter space for demo and the engineering test facility (ETF)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meier, Wayne R.

    1999-01-19

    In our IFE development plan, we have set a goal of building an Engineering Test Facility (ETF) for a total cost of $2B and a Demo for $3B. In Mike Campbell' s presentation at Madison, we included a viewgraph with an example Demo that had 80 to 250 MWe of net power and showed a plausible argument that it could cost less than $3B. In this memo, I examine the design space for the Demo and then briefly for the ETF. Instead of attempting to estimate the costs of the drivers, I pose the question in a way to definemore » R&D goals: As a function of key design and performance parameters, how much can the driver cost if the total facility cost is limited to the specified goal? The design parameters examined for the Demo included target gain, driver energy, driver efficiency, and net power output. For the ETF; the design parameters are target gain, driver energy, and target yield. The resulting graphs of allowable driver cost determine the goals that the driver R&D programs must seek to meet.« less

  19. Integrating Innovation Skills in an Introductory Engineering Design-Build Course

    ERIC Educational Resources Information Center

    Liebenberg, Leon; Mathews, Edward Henry

    2012-01-01

    Modern engineering curricula have started to emphasize design, mostly in the form of design-build experiences. Apart from instilling important problem-solving skills, such pedagogical frameworks address the critical social skill aspects of engineering education due to their team-based, project-based nature. However, it is required of the…

  20. 40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), DETAIL SOUTHEAST SIDE OF EXTERIOR ELECTRICAL EQUIPMENT ROOM, SHOWING DOOR TO SEWING ROOM NO. 3, VENTILATOR FAN (OVER DOOR), STEAM LINE (PIPE), SEWING MACHINE MOTOR IN OVERHEAD, ALARM BELL, EXPLOSION-PROOF SWITCH BOXES, GROUNDS ON DOORS, PULL ALARM HANDLE (EXTREME RIGHT; PULLEY CABLE CONDUCTED IN CONDUIT TO SWITCH INSIDE BUILDING. PULLEYS INSIDE ALL ELBOW JOINTS.) - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  2. Engineering the formation of secondary building blocks within hollow interiors.

    PubMed

    Li, Xiaobo; Liu, Xiao; Ma, Yi; Li, Mingrun; Zhao, Jiao; Xin, Hongchuan; Zhang, Lei; Yang, Yan; Li, Can; Yang, Qihua

    2012-03-15

    Secondary building blocks within the cavities of primary silica-architecture building blocks are successfully engineered. The immobilized surfactant directs the selective dissolution and reassembly of dissolved silicate species for the formation of secondary building blocks (hollow nanospheres/nanorods; see figure). Supported TiO(2) on nanostructures with multilevel interiors is shown to exhibit significantly enhanced activity in photocatalytic H(2) production. Copyright © 2012 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  3. 28. Historic view of Building 202 exhaust scrubber stack, detail, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Historic view of Building 202 exhaust scrubber stack, detail, July 31, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45648. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  4. 58. Historic plan, section, and detail drawing of Building 202 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Historic plan, section, and detail drawing of Building 202 test cell, June 29, 1955. NASA GRC drawing no. CE-101340 (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  5. Characterization report for Building 301 Hot Cell Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-07-01

    During the period from October, 1997, through March, 1998, ANL-E Health Physics conducted a pre-D and D characterization of Building 301, referred to as the Hot Cell Facility. While primary emphasis was placed on radiological evaluation, the presence of non-nuclear hazardous and toxic material was also included in the scope of the characterization. This is one of the early buildings on the ANL-E site, and was heavily used in the 1950`s and 1960`s for various nuclear reaction and reactor design studies. Some degree of cleanup and contamination fixation was done in the 1970`s, so that the building could be usedmore » with a minimum of risk of personnel contamination. Work records are largely nonexistent for the early history of the building, so that any assumptions about extent and type of contamination had to be kept very open in the survey planning process. The primary contaminant was found to be painted-over Cs-137 embedded in the concrete floors, although a variety of other nuclides consistent with the work said to have been performed were found in smaller quantities. Due to leaks and drips through the floor, a relatively modest amount of soil contamination was found in the service trench under the building, not penetrating deeply. Two contaminated, disconnected drain lines leaving the building could not be traced by site records, and remain a problem for remediation. The D and D Characterization Plan was fulfilled.« less

  6. Photocopy of photograph (original print located at Engineering Management Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of photograph (original print located at Engineering Management Building, Naval Shipyard, Long Beach). Navy Photograph, July 4, 1942, Photograph #2229. MAIN GATE 1, FROM OUTSIDE (NORTH) OF ENTRANCE, FACING SOUTHWEST (WITH BUILDING 40 IN BACKGROUND) - Roosevelt Base, Main Gate No. 1, Ocean Boulevard where Nevada & Maryland Street meet, Long Beach, Los Angeles County, CA

  7. 30. Historic view of twentythousandpound rocket test stand with engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Historic view of twenty-thousand-pound rocket test stand with engine installation in test cell of Building 202, looking down from elevated location, September 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45872. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. 41. Historic photo of Building 202 test cell interior, Robert ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Historic photo of Building 202 test cell interior, Robert J. Gardener checking fuel implinging qualities of a twenty-thousand-pound-thrust rocket engine injector. Setting appears to be a platform mounted on top of scrubber tank underneath test cell floor, December 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-52166. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  9. 15. View of the Main Office (Buildings 1, 2, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View of the Main Office (Buildings 1, 2, and 3), U.S. Plant Introduction Station, Glenn Dale, MD, ca. 1950. Facilities and Engineering Branch. Beltsville Agricultural Research Center, Building 426. - U.S. Plant Introduction Station, 11601 Old Pond Road, Glenn Dale, Prince George's County, MD

  10. 29 CFR 1926.758 - Systems-engineered metal buildings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.758... systems-engineered metal buildings except §§ 1926.755 (column anchorage) and 1926.757 (open web steel... hoisting equipment is released. (d) Construction loads shall not be placed on any structural steel...

  11. 29 CFR 1926.758 - Systems-engineered metal buildings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.758... systems-engineered metal buildings except §§ 1926.755 (column anchorage) and 1926.757 (open web steel... hoisting equipment is released. (d) Construction loads shall not be placed on any structural steel...

  12. 29 CFR 1926.758 - Systems-engineered metal buildings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.758... systems-engineered metal buildings except §§ 1926.755 (column anchorage) and 1926.757 (open web steel... hoisting equipment is released. (d) Construction loads shall not be placed on any structural steel...

  13. 25. Photocopy of engineering drawing, January, 1988 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of engineering drawing, January, 1988 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). EXTERIOR ELEVATIONS (northeast and southeast) - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  14. 26. Photocopy of engineering drawing, March 3, 1988 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photocopy of engineering drawing, March 3, 1988 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). EXTERIOR ELEVATIONS (southwest and northwest) - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  15. 24. CONSTRUCTION PROGRESS VIEW TO NORTHWEST, SHOWING BLOWER BUILDING. INEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. CONSTRUCTION PROGRESS VIEW TO NORTHWEST, SHOWING BLOWER BUILDING. INEEL PHOTO NUMBER NRTS-60-4407. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  16. Effectiveness of E-Learning for Students Vocational High School Building Engineering Program

    NASA Astrophysics Data System (ADS)

    Soeparno; Muslim, Supari

    2018-04-01

    Implementation of vocational learning in accordance with the 2013 curriculum must meet the criteria, one of which is learning to be consistent with advances in technology and information. Technology-based learning in vocational commonly referred to as E-Learning, online (in the network) and WBL (Web-Based Learning). Facts on the ground indicate that based learning technology and information on Vocational High School of Building Engineering is still not going well. The purpose of this research is to know: advantages and disadvantages of learning with E-Learning, conformity of learning with E-Learning with characteristics of students on Vocational High School of Building Engineering and effective learning method based on E-Learning for students on Vocational High School of Building Engineering. Research done by literature method, get the following conclusion as follow: the advantages of E-Learning is learning can be done anywhere and anytime, efficient in accessing materials and tasks, ease of communication and discussion; while the shortage is the need for additional costs for good internet access and lack of social interaction between teachers and students. E-learning is appropriate to basic knowledge competencies, and not appropriate at the level of advanced competencies and skills. Effective E-Learning Based Learning Method on Vocational High School of Building Engineering is a Blended method that is a mix between conventional method and e-learning.

  17. 29 CFR 1926.758 - Systems-engineered metal buildings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.758... systems-engineered metal buildings except §§ 1926.755 (column anchorage) and 1926.757 (open web steel...) Rigid frames shall have 50 percent of their bolts or the number of bolts specified by the manufacturer...

  18. 29 CFR 1926.758 - Systems-engineered metal buildings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Steel Erection § 1926.758... systems-engineered metal buildings except §§ 1926.755 (column anchorage) and 1926.757 (open web steel...) Rigid frames shall have 50 percent of their bolts or the number of bolts specified by the manufacturer...

  19. 43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), DETAIL OF EXPLOSION-PROOF ELECTRICAL SWITCH BOX (SWITCH GEAR INSIDE BOX SUBMERGED IN OIL TO QUENCH SPARKS), SWITCH EQUIPMENT MADE BY GENERAL ELECTRIC. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  20. REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT OF MTR BUILDING, TRA-603. WOOD PLANKS REST ON CANAL WALL OBSERVABLE IN FOREGROUND. INL NEGATIVE NO. 11745. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  1. 25. Historic view of Building 202 from bed of Abram ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Historic view of Building 202 from bed of Abram Creek with detention tank in foreground, April 26, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-1957-44838. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  2. 24. Photocopy of engineering drawing, August 17, 1965 (original drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of engineering drawing, August 17, 1965 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). 2080 READINESS CREW, COVERED WALKWAYS, PLAN AND DETAILS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA

  3. Automated Heat-Flux-Calibration Facility

    NASA Technical Reports Server (NTRS)

    Liebert, Curt H.; Weikle, Donald H.

    1989-01-01

    Computer control speeds operation of equipment and processing of measurements. New heat-flux-calibration facility developed at Lewis Research Center. Used for fast-transient heat-transfer testing, durability testing, and calibration of heat-flux gauges. Calibrations performed at constant or transient heat fluxes ranging from 1 to 6 MW/m2 and at temperatures ranging from 80 K to melting temperatures of most materials. Facility developed because there is need to build and calibrate very-small heat-flux gauges for Space Shuttle main engine (SSME).Includes lamp head attached to side of service module, an argon-gas-recirculation module, reflector, heat exchanger, and high-speed positioning system. This type of automated heat-flux calibration facility installed in industrial plants for onsite calibration of heat-flux gauges measuring fluxes of heat in advanced gas-turbine and rocket engines.

  4. Aviation Engine Test Facilities (AETF) fire protection study

    NASA Astrophysics Data System (ADS)

    Beller, R. C.; Burns, R. E.; Leonard, J. T.

    1989-07-01

    An analysis is presented to the effectiveness of various types of fire fighting agents in extinguishing the kinds of fires anticipated in Aviation Engine Test Facilities (AETF), otherwise known as Hush Houses. The agents considered include Aqueous Film-Forming Foam, Halon 1301, Halon 1211 and water. Previous test work has shown the rapidity with which aircraft, especially high performance aircraft, can be damaged by fire. Based on this, tentative criteria for this evaluation included a maximum time of 20 s from fire detection to extinguishment and a period of 30 min in which the agent would prevent reignition. Other issues examined included: toxicity, corrosivity, ease of personnel egress, system reliability, and cost effectiveness. The agents were evaluated for their performance in several fire scenarios, including: under frame fire, major engine fire, engine disintegration fire, high-volume pool fire with simultaneous spill fire, internal electrical fire, and runaway engine fire.

  5. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified

  6. 23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR, LOOKING SOUTH DOWN CENTRAL CORRIDOR. NOTE BINS IN WALLS ON EITHER SIDE OF CORRIDOR, USED FOR PASSING EXPLOSIVES AND LOADED ITEMS TO SIEVING ROOMS BEYOND WALLS. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  7. Avionics Systems Laboratory/Building 16. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia; Deming, Joan

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities that was conducted by NASA s Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Avionics Systems Laboratory (Building 16) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 16 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 16 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 16 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are

  8. LPT. Aerial of low power test facility (TAN640 and 641) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Aerial of low power test facility (TAN-640 and -641) and shield test facility (TAN-645 and -646). Camera facing south. Low power reactor cells at left, then one-story control building; diagonal fence; shield test control building, then (high-bay) pool room. In foreground are electrical pad, water tanks and guard house. Photographer: Lowin. Date: February 24, 1965. INEEL negative no. 65-987 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  9. Crew Systems Laboratory/Building 7. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    Building 7 is managed by the Crew and Thermal Systems Division of the JSC Engineering Directorate. Originally named the Life Systems Laboratory, it contained five major test facilities: two advanced environmental control laboratories and three human-rated vacuum chambers (8 , 11 , and the 20 ). These facilities supported flight crew familiarization and the testing and evaluation of hardware used in the early manned spaceflight programs, including Gemini, Apollo, and the ASTP.

  10. Allison V–1710 Engine on a Dynamotor Stand in the Engine Research Building

    NASA Image and Video Library

    1943-03-21

    The first research assignment specifically created for the National Advisory Committee for Aeronautics’ (NACA) new Aircraft Engine Research Laboratory was the integration of a supercharger into the Allison V–1710 engine. The military was relying on the liquid-cooled V–1710 to power several types of World War II fighter aircraft and wanted to improve the engine's speed and altitude performance. Superchargers forced additional airflow into the combustion chamber, which increased the engine’s performance resulting in greater altitudes and speeds. They also generated excess heat that affected the engine cylinders, oil, and fuel. In 1943 the military tasked the new Aircraft Engine Research Laboratory to integrate the supercharger, improve the cooling system, and remedy associated engine knock. Three Allison engines were provided to the laboratory’s research divisions. One group was tasked with improving the supercharger performance, another analyzed the effect of the increased heat on knock in the fuel, one was responsible for improving the cooling system, and another would install the new components on the engine with minimal drag penalties. The modified engines were installed on this 2000-horsepower dynamotor stand in a test cell within the Engine Research Building. The researchers could run the engine at different temperatures, fuel-air ratios, and speeds. When the modifications were complete, the improved V–1710 was flight tested on a P–63A Kingcobra loaned to the NACA for this project.

  11. Control Limits for Building Energy End Use Based on Engineering Judgment, Frequency Analysis, and Quantile Regression

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henze, Gregor P.; Pless, Shanti; Petersen, Anya

    2014-02-01

    Approaches are needed to continuously characterize the energy performance of commercial buildings to allow for (1) timely response to excess energy use by building operators; and (2) building occupants to develop energy awareness and to actively engage in reducing energy use. Energy information systems, often involving graphical dashboards, are gaining popularity in presenting energy performance metrics to occupants and operators in a (near) real-time fashion. Such an energy information system, called Building Agent, has been developed at NREL and incorporates a dashboard for public display. Each building is, by virtue of its purpose, location, and construction, unique. Thus, assessing buildingmore » energy performance is possible only in a relative sense, as comparison of absolute energy use out of context is not meaningful. In some cases, performance can be judged relative to average performance of comparable buildings. However, in cases of high-performance building designs, such as NREL's Research Support Facility (RSF) discussed in this report, relative performance is meaningful only when compared to historical performance of the facility or to a theoretical maximum performance of the facility as estimated through detailed building energy modeling.« less

  12. 26. Photographic copy of plant engineer's handdrawn buildings function chart, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of plant engineer's hand-drawn buildings function chart, dated 1967; Ink and pencil on tracing paper; Attributed to GWN, Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; SHEET THREE; OUTLINES ACTIVITIES TAKING PLANE ON EACH FLOOR OF MAJOR BUILDINGS IN THE RATH COMPLEX - Rath Packing Company, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  13. 24. Photographic copy of plant engineer's handdrawn buildings function chart, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photographic copy of plant engineer's hand-drawn buildings function chart, dated 1967; Ink and pencil on tracing paper; Attributed to GWN, Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; SHEET ONE; OUTLINES ACTIVITIES TAKING PLANE ON EACH FLOOR OF MAJOR BUILDINGS IN THE RATH COMPLEX - Rath Packing Company, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  14. 25. Photographic copy of plant engineer's handdrawn buildings function chart, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of plant engineer's hand-drawn buildings function chart, dated 1967; Ink and pencil on tracing paper; Attributed to GWN, Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; SHEET TWO; OUTLINES ACTIVITIES TAKING PLANE ON EACH FLOOR OF MAJOR BUILDINGS IN THE RATH COMPLEX - Rath Packing Company, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  15. A laboratory facility for research on wind-driven rain intrusion in building envelope assemblies

    Treesearch

    Samuel V. Glass

    2010-01-01

    Moisture management is critical for durable, energy-efficient buildings. To address the need for research on wind-driven rain intrusion in wall assemblies, the U.S. Forest Products Laboratory is developing a new facility. This paper describes the underlying principle of this facility and its capabilities.

  16. 11 CFR 100.56 - Office building or facility for national party committees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... national party committees. A gift, subscription, loan, advance, or deposit of money or anything of value to a national party committee for the purchase or construction of an office building or facility is a...

  17. Engineering study for closure of 209E facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  18. 26. Historic view of Building 202, May 22, 1957. On ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Historic view of Building 202, May 22, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45652.On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-46492. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  19. SPERTI Terminal Building (PER604). Oblique view of front entry and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Terminal Building (PER-604). Oblique view of front entry and one side. Electrical transformers at right of building. Note "Butler" logo. Photographer: R.G. Larsen. Date: June 22, 1955. INEEL negative no. 55-1700 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. 1. Context view of Building 206A, looking northwest, showing southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Context view of Building 206A, looking northwest, showing southeast corner, with water tank in background. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  1. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  2. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  4. Great Lakes Steel -- PCI facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eichinger, F.T.; Dake, S.H.; Wagner, E.D.

    1997-12-31

    This paper discusses the planning, design, and start-up of the 90 tph PCI facility for National Steel`s Great Lakes Steel Division in River Rouge, MI. This project is owned and operated by Edison Energy Services, and was implemented on a fast-track basis by Raytheon Engineers and Constructors, Babcock Material Handling, and Babcock and Wilcox. This paper presents important process issues, basic design criteria, an the challenges of engineering and building a state-of-the-art PCI facility in two existing plants. Pulverized coal is prepared at the River Rouge Power Plant of Detroit Edison, is pneumatically conveyed 6,000 feet to a storage silomore » at Great Lakes Steel, and is injected into three blast furnaces.« less

  5. Engineering test facility design definition

    NASA Technical Reports Server (NTRS)

    Bercaw, R. W.; Seikel, G. R.

    1980-01-01

    The Engineering Test Facility (ETF) is the major focus of the Department of Energy (DOE) Magnetohydrodynamics (MHD) Program to facilitate commercialization and to demonstrate the commercial operability of MHD/steam electric power. The ETF will be a fully integrated commercial prototype MHD power plant with a nominal output of 200 MW sub e. Performance of this plant is expected to meet or surpass existing utility standards for fuel, maintenance, and operating costs; plant availability; load following; safety; and durability. It is expected to meet all applicable environmental regulations. The current design concept conforming to the general definition, the basis for its selection, and the process which will be followed in further defining and updating the conceptual design.

  6. Savannah River Plant engineering and design history. Volume 4: 300/700 Areas & general services and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1957-01-01

    The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Wastemore » Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.« less

  7. Educational Building and Facilities in the Asian Region. Bulletin No. 17.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and Oceania.

    Educational facilities analyzed in this bulletin are in the countries of the Republic of Afghanistan, Australia, Bangladesh, India, Japan, Republic of Korea, Malaysia, Nepal, New Zealand, Pakistan, Singapore, Sri Lanka, and Thailand. The first section reviews the historical reasons for different stages of school building development in the…

  8. Communications and Tracking Development Laboratory/Building 44. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas, prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Communications and Tracking Development Laboratory (Building 44) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 44 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle Program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 44 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented by 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle Program; the history of JSC in relation to the SSP; a narrative of the history of Building 44 and how it supported the SSP; and a physical description of the building. In addition, photographs documenting the construction and historical use of Building 44 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work

  9. SPERTI Reactor Pit Building (PER605) from contrasting direction as photo ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Reactor Pit Building (PER-605) from contrasting direction as photo above (ID-33-F-32). Note Guard House door, security fencing around facility. Photographer: R.G. Larsen. Date: July 22, 1955. INEEL negative no. 55-1702. - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. Engineering Challenges for Closed Ecological System facilities

    NASA Astrophysics Data System (ADS)

    Dempster, William; Nelson, Mark; Allen, John P.

    2012-07-01

    Engineering challenges for closed ecological systems include methods of achieving closure for structures of different materials, and developing methods of allowing energy (for heating and cooling) and information transfer through the materially closed structure. Methods of calculating degree of closure include measuring degradation rates of inert trace gases introduced into the system. An allied problem is developing means of locating where leaks are located so that they may be repaired and degree of closure maintained. Once closure is achieved, methods of dealing with the pressure differentials between inside and outside are needed: from inflatable structures which might adjust to the pressure difference to variable volume chambers attached to the life systems component. These issues are illustrated through the engineering employed at Biosphere 2, the Biosphere 2 Test Module and the Laboratory Biosphere and a discussion of methods used by other closed ecological system facility engineers. Ecological challenges include being able to handle faster cycling rates and accentuated daily and seasonal fluxes of critical life elements such as carbon dioxide, oxygen, water, macro- and mico-nutrients. The problems of achieving sustainability in closed systems for life support include how to handle atmospheric dynamics including trace gases, producing a complete human diet and recycling nutrients and maintaining soil fertility, healthy air and water and preventing the loss of crucial elements from active circulation. In biospheric facilities the challenge is also to produce analogue to natural biomes and ecosystems, studying processes of self-organization and adaptation in systems that allow specification or determination of state variables and cycles which may be followed through all interactions from atmosphere to soils.

  11. SPERTI Instrument Cell Building (PER606) elevation; plan of Guard House ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Instrument Cell Building (PER-606) elevation; plan of Guard House (PER-607); elevations for Pit Building (PER-605) southwest, southeast, and northeast sides. Earthen shield is mounded between back wall of Instrument Cell Building and the southwest elevation of Pit Building. Detail of filtered louver in door of Instrument Cell Building. Idaho Operations Office PER-605-IDO-3. INEEL index no. 761-0605-00-396-109183 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    ScienceCinema

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    2018-01-16

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  13. Draftsmen at Work during Construction of the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1942-09-21

    The National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory was designed by a group of engineers at the Langley Memorial Aeronautical Laboratory in late 1940 and 1941. Under the guidance of Ernest Whitney, the men worked on drawings and calculations in a room above Langley’s Structural Research Laboratory. The main Aircraft Engine Research Laboratory design group originally consisted of approximately 30 engineers and draftsmen, but there were smaller groups working separately on specific facilities. The new engine lab would have six principal buildings: the Engine Research Building, hangar, Fuels and Lubricants Building, Administration Building, Propeller Test Stand, and Altitude Wind Tunnel. In December 1941 most of those working on the project transferred to Cleveland from Langley. Harrison Underwood and Charles Egan led 18 architectural, 26 machine equipment, 3 structural and 10 mechanical draftsmen. Initially these staff members were housed in temporary offices in the hangar. As sections of the four-acre Engine Research Building were completed in the summer of 1942, the design team began relocating there. The Engine Research Building contained a variety of test cells and laboratories to address virtually every aspect of piston engine research. It also contained a two-story office wing, seen in this photograph that would later house many of the powerplant research engineers.

  14. NASA Researcher Adjusts a Travelling Magnetic Wave Plasma Engine

    NASA Image and Video Library

    1964-02-21

    Raymond Palmer, of the Electromagnetic Propulsion Division’s Plasma Flow Section, adjusts the traveling magnetic wave plasma engine being operated in the Electric Power Conversion at the National Aeronautics and Space Administration (NASA) Lewis Research Center. During the 1960s Lewis researchers were exploring several different methods of creating electric propulsion systems, including the traveling magnetic wave plasma engine. The device operated similarly to alternating-current motors, except that a gas, not a solid, was used to conduct the electricity. A magnetic wave induced a current as it passed through the plasma. The current and magnetic field pushed the plasma in one direction. Palmer and colleague Robert Jones explored a variety of engine configurations in the Electric Propulsion Research Building. The engine is seen here mounted externally on the facility’s 5-foot diameter and 16-foot long vacuum tank. The four magnetic coils are seen on the left end of the engine. The researchers conducted two-minute test runs with varying configurations and used of both argon and xenon as the propellant. The Electric Propulsion Research Building was built in 1942 as the Engine Propeller Research Building, often called the Prop House. It contained four test cells to study large reciprocating engines with their propellers. After World War II, the facility was modified to study turbojet engines. By the 1960s, the facility was modified again for electric propulsion research and given its current name.

  15. Single-Source Responsibility: An Innovative Way to Build College Sports, Fitness and Rec Facilities

    ERIC Educational Resources Information Center

    Wakely, Jim

    2013-01-01

    While schools wrestled with how to build a new athletic facility in the middle of a recession, Tufts University's Athletics and Operations Departments worked with a Massachusetts-based developer called Stanmar Inc. to devise a creative solution to designing, building and financing a new sports and fitness center in just under 24 months. Tufts was…

  16. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  17. 9. Credit JPL. Photographic copy of drawing, engineering drawing showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Credit JPL. Photographic copy of drawing, engineering drawing showing structure of Test Stand 'A' (Building 4202/E-3) and its relationship to the Monitor Building or blockhouse (Building 4203/E-4) when a reinforced concrete machinery room was added to the west side of Test Stand 'A' in 1955. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Electrical Layout - Muroc, Test Stand & Refrigeration Equipment Room,' drawing no. E3/7-0, April 6, 1955. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Edwards Air Force Base, Boron, Kern County, CA

  18. 24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR VIEW LOOKING WEST AT NORTH END OF CENTRAL CORRIDOR (ROOM 3). STAIRWAY WORKBENCH WITH COMPRESSED-AIR POWERED CARTRIDGE LOADER. ARMORED PASS-THROUGH OF TRANSFER BOX FOR PASSING EXPLOSIVES MATERIALS THROUGH TO NEXT ROOM TO THE NORTH. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  19. SPERTI, Instrument Cell Building (PER606). North facade. Date: August 2003. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I, Instrument Cell Building (PER-606). North facade. Date: August 2003. INEEL negative no. HD-35-3-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. 16. VIEW OF THE STATIONARY OPERATING ENGINEER CONTROL PANEL INSTALLATION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. VIEW OF THE STATIONARY OPERATING ENGINEER CONTROL PANEL INSTALLATION. THE PANEL CONTROLS AIR-HANDLING EQUIPMENT AND AIR PRESSURE WITHIN THE BUILDING. (10/6/69) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  1. Facilities | Buildings | NREL

    Science.gov Websites

    state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency building's energy use and make adjustments. Low-Energy Parking Structure Photo of the parking structure on structure in February 2012. The structure's estimated energy use is 42 kilowatt-hours per parking stall

  2. SPERTI Terminal Building (PER604) is under construction in foreground, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Terminal Building (PER-604) is under construction in foreground, with vertical metal siding partially affixed to gable end of building. Utility lines are laid in shallow trench to Reactor Pit and Instrument Cell Buildings also under construction in distance. Photographer: R.G. Larsen. Date: April 22, 1955. INEEL negative no. 55-1001 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  4. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  5. A unique high heat flux facility for testing hypersonic engine components

    NASA Technical Reports Server (NTRS)

    Melis, Matthew E.; Gladden, Herbert J.

    1990-01-01

    This paper describes the Hot Gas Facility, a unique, reliable, and cost-effective high-heat-flux facility for testing hypersonic engine components developed at the NASA Lewis Research Center. The Hot Gas Facility is capable of providing heat fluxes ranging from 200 Btu/sq ft per sec on flat surfaces up to 8000 Btu/sq ft per sec at a leading edge stagnation point. The usefulness of the Hot Gas Facility for the NASP community was demonstrated by testing hydrogen-cooled structures over a range of temperatures and pressures. Ranges of the Reynolds numbers, Prandtl numbers, enthalpy, and heat fluxes similar to those expected during hypersonic flights were achieved.

  6. PBF Reactor Building (PER620). Camera facing north toward south facade. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera facing north toward south facade. Note west-wing siding on concrete block; high-bay siding of metal. Excavation and forms for signal and cable trenches proceed from building. Photographer: Kirsh. Date August 20, 1968. INEEL negative no. 68-3332 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  7. PBF Cooling Tower (PER720) and its Auxiliary Building (PER625). Camera ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower (PER-720) and its Auxiliary Building (PER-625). Camera facing west shows east facades. Center pipe carried secondary coolant water from reactor. Building to distributor basin. Date: August 2003. INEEL negative no. HD-35-10-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  8. The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling (BIM)

    DTIC Science & Technology

    2012-11-01

    Building Information Modeling ( BIM ) En gi ne er R es ea rc h an...Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac- ceptance throughout the planning, architecture, engineering...the Industry Foundation Class (IFC) definitions to create vendor-neutral data exchanges for use in BIM software tools. Building Information Modeling

  9. PBF Reactor Building (PER620). Fuel rod test assembly is on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Fuel rod test assembly is on display at PBF. Date: 1982. INEEL negative no. 82-4893 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. Mission Control Center/Building 30. Historical Documentation

    NASA Technical Reports Server (NTRS)

    2010-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas, prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Mission Control Center (Building 30) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 30 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle Program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. It should be noted that the Mission Control Center was designated a National Historic Landmark in 1985 for its role in the Apollo 11 Lunar Landing. At the time of this documentation, Building 30 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 30 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 30 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features

  11. Building a genome engineering toolbox in nonmodel prokaryotic microbes.

    PubMed

    Freed, Emily; Fenster, Jacob; Smolinski, Sharon L; Walker, Julie; Henard, Calvin A; Gill, Ryan; Eckert, Carrie A

    2018-05-11

    The realization of a sustainable bioeconomy requires our ability to understand and engineer complex design principles for the development of platform organisms capable of efficient conversion of cheap and sustainable feedstocks (e.g., sunlight, CO 2 , and nonfood biomass) into biofuels and bioproducts at sufficient titers and costs. For model microbes, such as Escherichia coli, advances in DNA reading and writing technologies are driving the adoption of new paradigms for engineering biological systems. Unfortunately, microbes with properties of interest for the utilization of cheap and renewable feedstocks, such as photosynthesis, autotrophic growth, and cellulose degradation, have very few, if any, genetic tools for metabolic engineering. Therefore, it is important to develop "design rules" for building a genetic toolbox for novel microbes. Here, we present an overview of our current understanding of these rules for the genetic manipulation of prokaryotic microbes and the available genetic tools to expand our ability to genetically engineer nonmodel systems. © 2018 Wiley Periodicals, Inc.

  12. Value Engineering. Technical Manual. School Facilities Development Procedures Manual.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    Value Engineering (VE) is a cost-optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. This technical manual provides guidance in developing the scope and applicability of VE to school projects; in…

  13. FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), SECOND FLOOR SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), SECOND FLOOR SHOWING PROCESS MAKEUP AREA AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING COLD LAB, DECONTAMINATION ROOM, MULTICURIE CELL ROOM, AND OFFICES. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051980. ALTERNATE ID NUMBER CPP-E-1980. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  14. A Center for Extraterrestrial Engineering and Construction (CETEC)

    NASA Technical Reports Server (NTRS)

    Leigh, Gerald G.

    1992-01-01

    A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.

  15. SPERTI, Instrument Cell Building (PER606). West facade. Camera facing northeast. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I, Instrument Cell Building (PER-606). West facade. Camera facing northeast. Date: August 2003. INEEL negative no. HD-35-3-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. SPERTI, Instrument Cell Building (PER606). East facade. Camera facing southwest. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I, Instrument Cell Building (PER-606). East facade. Camera facing southwest. Date: August 2003. INEEL negative no. HD-35-3-2 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  17. 14. Historic elevation drawing of Building 206A, September 8, 1982. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic elevation drawing of Building 206A, September 8, 1982. NASA GRC drawing number CF-100863. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. ETR CRITICAL FACILITY, TRA654. CONTEXTUAL VIEW. CAMERA ON ROOF OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CRITICAL FACILITY, TRA-654. CONTEXTUAL VIEW. CAMERA ON ROOF OF MTR BUILDING AND FACING SOUTH. ETR AND ITS COOLANT BUILDING AT UPPER PART OF VIEW. ETR COOLING TOWER NEAR TOP EDGE OF VIEW. EXCAVATION AT CENTER IS FOR ETR CF. CENTER OF WHICH WILL CONTAIN POOL FOR REACTOR. NOTE CHOPPER TUBE PROCEEDING FROM MTR IN LOWER LEFT OF VIEW, DIAGONAL TOWARD LEFT. INL NEGATIVE NO. 56-4227. Jack L. Anderson, Photographer, 12/18/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. [Provision of building maintenance services in healthcare facilities].

    PubMed

    Amorim, Gláucia Maria; Quintão, Eliana Cardoso Vieira; Martelli Júnior, Hercílio; Bonan, Paulo Rogério Ferreti

    2013-01-01

    The scope of this paper was to evaluate the provision of building maintenance services in health units, by means of a descriptive, quantitative and cross-sectional study, considering the five types of facilities (Primary Health, Emergency, Specialty, Hospital and Mental Health Units). The research was approved by the Research Ethics Comittee of FHEMIG with the Terms of Agreement signed with the Unified Health System of Betim. Comparative analysis was conducted by checking the requirements of "Physical-Functional Structure Management" of the "Brazilian Hospital Accreditation Manual" of the National Accreditation Organization. Nonconformities were noted in the physical-functional management of the health centers, especially the primary health units. The assessment was important, considering that compliance with formal, technical and structural requirements, welfare activities, according to the service organization and appropriate to the profile and complexity, can collaborate to minimize the risks of users. To improve the quality of health care establishments, it is essential that managers, backed by "top management," prioritize financial, human and material resources in planning to ensure compliance with security requirements of users in buildings.

  20. PBF Control Building auxiliary features, including fire hose house and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building auxiliary features, including fire hose house and sewage system. Ebasco Services 1205 PER/PER-A-4. INEEL undex no. 760-0619-00-205-123024 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  1. Photography of photograph (original print located at Engineering Management Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photography of photograph (original print located at Engineering Management Building, Naval Shipyard, Long Beach). U.S. Naval Air Station San Pedro Photograph, May 7, 1945, Photograph #9374. NET PIER, FACING NORTHEAST - Roosevelt Base, Net Pier, Corner of Richardson Avenue & Idaho Street, Long Beach, Los Angeles County, CA

  2. SPERTI. Detail view of Reactor Pit Building (PER605) and Instrument ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I. Detail view of Reactor Pit Building (PER-605) and Instrument Cell (PER-606). Earth shielding covers side of Cell Building next to reactor. Instrumentation required protection from radiation emitted during reactor operation. Photographer: R.G. Larsen. Date: May 20, 1955. INEEL negative no. 55-1290 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. Building energy analysis of Electrical Engineering Building from DesignBuilder tool: calibration and simulations

    NASA Astrophysics Data System (ADS)

    Cárdenas, J.; Osma, G.; Caicedo, C.; Torres, A.; Sánchez, S.; Ordóñez, G.

    2016-07-01

    This research shows the energy analysis of the Electrical Engineering Building, located on campus of the Industrial University of Santander in Bucaramanga - Colombia. This building is a green pilot for analysing energy saving strategies such as solar pipes, green roof, daylighting, and automation, among others. Energy analysis was performed by means of DesignBuilder software from virtual model of the building. Several variables were analysed such as air temperature, relative humidity, air velocity, daylighting, and energy consumption. According to two criteria, thermal load and energy consumption, critical areas were defined. The calibration and validation process of the virtual model was done obtaining error below 5% in comparison with measured values. The simulations show that the average indoor temperature in the critical areas of the building was 27°C, whilst relative humidity reached values near to 70% per year. The most critical discomfort conditions were found in the area of the greatest concentration of people, which has an average annual temperature of 30°C. Solar pipes can increase 33% daylight levels into the areas located on the upper floors of the building. In the case of the green roofs, the simulated results show that these reduces of nearly 31% of the internal heat gains through the roof, as well as a decrease in energy consumption related to air conditioning of 5% for some areas on the fourth and fifth floor. The estimated energy consumption of the building was 69 283 kWh per year.

  4. UNLV’s environmentally friendly Science and Engineering Building is monitored for earthquake shaking

    USGS Publications Warehouse

    Kalkan, Erol; Savage, Woody; Reza, Shahneam; Knight, Eric; Tian, Ying

    2013-01-01

    The University of Nevada Las Vegas’ (UNLV) Science and Engineering Building is at the cutting edge of environmentally friendly design. As the result of a recent effort by the U.S. Geological Survey’s National Strong Motion Project in cooperation with UNLV, the building is now also in the forefront of buildings installed with structural monitoring systems to measure response during earthquakes. This is particularly important because this is the first such building in Las Vegas. The seismic instrumentation will provide essential data to better understand the structural performance of buildings, especially in this seismically active region.

  5. This photocopy of an engineering drawing shows the BakerPerkins 150gallon ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photocopy of an engineering drawing shows the Baker-Perkins 150-gallon mixer installation in the building. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "150 Gallon Mixer System Bldg. E-34, Plans, Sections & Details," drawing no. E34/6-0, 10 July 1963. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Mixer, Edwards Air Force Base, Boron, Kern County, CA

  6. 2. VIEW TO THE SOUTHWEST OF THE MAIN EMAD BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW TO THE SOUTHWEST OF THE MAIN E-MAD BUILDING WITH THE COLD BAY ON THE EAST (LEFT) AND THE HOT BAY ON THE WEST (RIGHT). - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV

  7. PBF contextual view shows relationship between PBF Control Building (PER619, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF contextual view shows relationship between PBF Control Building (PER-619, in foreground at right) and SPERT-I Control Building (PER-601). Walkway with railing connects to waste reduction operations support building (PER-632), built in 1981. Note paneled stucco siding applied to PER-619 after 1980. Original concrete block is exposed at corner. Date: July 2004. INEEL negative no. HD-41-9-2 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  8. NASA Chief Technologist Douglas Terrier Tours Jacobs' Engineering Development Facility

    NASA Image and Video Library

    2017-08-10

    NASA Chief Technologist Douglas Terrier joins Jacobs General Manager Lon Miller during a tour of the company's Engineering Development Facility in Houston. Jacobs provides advanced technologies used aboard the International Space Station and for deep space exploration. From left: NASA’s Johnson Space Center Chief Technologist Chris Culbert, Chief Technologist Douglas Terrier, Jacobs Clear Lake Group Deputy General Manager Joy Kelly and Jacobs Clear Lake Group General Manager Lon Miller. Date: 08-10-2017 Location: B1 & Jacobs Engineering Subject: NASA Acting Chief Technology Officer Douglas Terrier Tours JSC and Jacobs Photographer: David DeHoyos

  9. PBF Reactor Building (PER620). PBF crane holds fuel test assembly ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). PBF crane holds fuel test assembly aloft prior to lowering into reactor for test. Date: 1982. INEEL negative no. 82-4909 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. SPERTI Control Building (PER601). Elevations. Note cable inlet on west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Control Building (PER-601). Elevations. Note cable inlet on west elevation. Idaho Operations Office. Date: February 1955. INEEL index no. 760-0601-00-396-109143 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  11. SPERTI Control Building (PER601) floor plan. Detail of cable inlet. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Control Building (PER-601) floor plan. Detail of cable inlet. Idaho Operations Office. Date: February 1955. INEEL index no. 760-0601-00-396-109139 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. PBF Reactor Building (PER620). Floor at left of view is ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Floor at left of view is floor of first basement. Photographer: Farmer/Capek. Date: March 17, 1967. INEEL negative no. 67-1753 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  13. PBF Reactor Building (PER620). Canal takes shape, with rebar and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Canal takes shape, with rebar and concrete placement underway. Photographer: John Capek. Date: August 16, 1967. INEEL negative no. 67-4370 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  14. SPERTI, Instrument Cell Building (PER606). Oblique view of north and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I, Instrument Cell Building (PER-606). Oblique view of north and east facades. Camera facing southwest. Date: August 2003. INEEL negative no. HD-35-4-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  15. PBF Reactor Building (PER620). Construction view shows native lava rock ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Construction view shows native lava rock surrounding basement excavation and general complexity of planning required to build the PBF. A three-inch low-pressure air line protrudes from wall just below left center. Date: February 21, 1967. Photographer: Larry Page. INEEL negative no. 67-1125 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. SPERTI contextual view of instrument cell building, PER606. South facade. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I contextual view of instrument cell building, PER-606. South facade. Camera facing northwest. PBF Cooling Tower in view at right. High bay of PBF Reactor Building, PER-602, is further to right. PBF-625 at left edge of view. Date: August 2003. INEEL negative no. HD-35-3-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  17. NORTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP601) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. HOT PILOT PLANT BUILDING (CPP-640) APPEARS IN RIGHT OF PHOTO. THE REMOTE ANALYTICAL FACILITY (CPP-627) WAS LOCATED ON CONCRETE PAD IN FOREGROUND. INL PHOTO NUMBER HD-54-33-3. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  18. PBF Reactor Building (PER620). Plot plan shows layout, including auxiliary ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Plot plan shows layout, including auxiliary buildings: Emergency Generator (621), Hose House (622), Cooling Tower Auxiliary (624), Maintenance and Storage Warehouse (625), Gas Cylinder Storage (627), Hose House (628), Cooling Tower (720), Substation (719), and other features. Road connections between PBF Reactor, its control building, and SPERT-I site. Note cable trenches along road to control building. Date: July 1965. Ebasco Services, PER-U-101. INEEL index no. 761-0100-00-205-123005 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  19. SOUTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTH. INL PHOTO NUMBER HD-54-15-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  20. NORTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTH. INL PHOTO NUMBER HD-54-16-1. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. The ISOLDE facility

    NASA Astrophysics Data System (ADS)

    Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.

    2017-09-01

    The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).

  2. VIEW OF BUILDING 778 LOOKING WESTSOUTHWEST. BUILDING 778 HOUSED LAUNDRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 778 LOOKING WEST-SOUTHWEST. BUILDING 778 HOUSED LAUNDRY FACILITIES, SHOWERS, LOCKER ROOMS, SANITARY FACILITIES, AN ELECTRIC SHOP, MACHINE SHOP, SHEET METAL SHOP, AND INERT GAS STORAGE. (12/7/90) - Rocky Flats Plant, Laundry Facility, Northeast quad of Plant between buildings 776/777 & 707, Golden, Jefferson County, CO

  3. Construction of a Solid State Research Facility, Building 3150. Environmental Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration ofmore » the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems.« less

  4. Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 basemore » pairs per year, while still retaining its efficiency.« less

  5. PBF Control Building (PER619). Interior in data acquisition room showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior in data acquisition room showing data racks. The system recorded multiple channels of data during tests. INEEL negative no. HD-41-8-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  6. PBF Control Building (PER619) south facade. Camera faces north. Note ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619) south facade. Camera faces north. Note buried tanks with bollards protecting their access hatches. Date: July 2004. INEEL negative no. HD-41-10-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  7. 9. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT "C" FACE RADAR SYSTEM EMITTER/ANTENNA. VIEW IS LOOKING SOUTH 30° EAST (NOTE: "C" FACE NOT IN USE AT FACILITY). - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. Energy Systems Integration Facility (ESIF): Golden, CO - Energy Integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheppy, Michael; VanGeet, Otto; Pless, Shanti

    2015-03-01

    At NREL's Energy Systems Integration Facility (ESIF) in Golden, Colo., scientists and engineers work to overcome challenges related to how the nation generates, delivers and uses energy by modernizing the interplay between energy sources, infrastructure, and data. Test facilities include a megawatt-scale ac electric grid, photovoltaic simulators and a load bank. Additionally, a high performance computing data center (HPCDC) is dedicated to advancing renewable energy and energy efficient technologies. A key design strategy is to use waste heat from the HPCDC to heat parts of the building. The ESIF boasts an annual EUI of 168.3 kBtu/ft2. This article describes themore » building's procurement, design and first year of performance.« less

  9. Flight Research Building at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1942-09-21

    The Flight Research Building at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory is a 272- by 150-foot hangar with an internal height up to 90 feet. The hangar’s massive 37.5-foot-tall and 250-foot-long doors can be opened in sections to suit different size aircraft. The hangar has sheltered a diverse fleet of aircraft over the decades. These have ranged from World War II bombers to Cessna trainers and from supersonic fighter jets to a DC–9 airliner. At the time of this September 1942 photograph, however, the hangar was being used as an office building during the construction of the laboratory. In December of 1941, the Flight Research Building became the lab’s first functional building. Temporary offices were built inside the structure to house the staff while the other buildings were completed. The hangar offices were used for an entire year before being removed in early 1943. It was only then that the laboratory acquired its first aircraft, pilots and flight mechanics. The temporary one-story offices can be seen in this photograph inside the large sliding doors. Also note the vertical lift gate below the NACA logo. The gate was installed so that the tails of larger aircraft could pass into the hangar. The white Farm House that served as the Administration Building during construction can be seen in the distance to the left of the hangar.

  10. Evaluating the Maturity of Cybersecurity Programs for Building Control Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glantz, Clifford S.; Somasundaram, Sriram; Mylrea, Michael E.

    The cyber-physical security threat to buildings is complex, non-linear, and rapidly evolving as operational and information technologies converge and connect buildings to cyberspace. Cyberattacks on buildings can exploit smart building controls and breach corporate networks, causing financial and reputational damage. This may result in the loss of sensitive building information or the disruption of, or damage to, the systems necessary for the safe and efficient operation of buildings. For the buildings and facility infrastructure, there is a need for a robust national cybersecurity strategy for buildings, guidance on the selection and implementation of appropriate cybersecurity controls for buildings, an approachmore » to evaluate the maturity and adequacy of the cybersecurity programs. To provide an approach for evaluating the maturity of the cybersecurity programs for building control systems, the US Department of Energy’s widely used Cybersecurity Capability and Maturity Model (C2M2) has been adapted into a building control systems version. The revised model, the Buildings-C2M2 (B-C2M2) provides maturity level indicators for cybersecurity programmatic domains. A “B-C2M2 Lite” version allows facility managers and building control system engineers, or information technology personnel to perform rapid self-assessments of their cybersecurity program. Both tools have been pilot tested on several facilities. This paper outlines the concept of a maturity model, describes the B-C2M2 tools, presents results and observations from the pilot assessments, and lays out plans for future work.« less

  11. 1. Photographic copy of engineering drawing showing elevations and sections ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of engineering drawing showing elevations and sections of Test Stand 'E' (Building 4259/E-60). California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Solid Propellant Test Stand E-60 - Elevations & Sections,' sheet E60/10, no date. - Jet Propulsion Laboratory Edwards Facility, Test Stand E, Edwards Air Force Base, Boron, Kern County, CA

  12. Engineering cell factories for producing building block chemicals for bio-polymer synthesis.

    PubMed

    Tsuge, Yota; Kawaguchi, Hideo; Sasaki, Kengo; Kondo, Akihiko

    2016-01-21

    Synthetic polymers are widely used in daily life. Due to increasing environmental concerns related to global warming and the depletion of oil reserves, the development of microbial-based fermentation processes for the production of polymer building block chemicals from renewable resources is desirable to replace current petroleum-based methods. To this end, strains that efficiently produce the target chemicals at high yields and productivity are needed. Recent advances in metabolic engineering have enabled the biosynthesis of polymer compounds at high yield and productivities by governing the carbon flux towards the target chemicals. Using these methods, microbial strains have been engineered to produce monomer chemicals for replacing traditional petroleum-derived aliphatic polymers. These developments also raise the possibility of microbial production of aromatic chemicals for synthesizing high-performance polymers with desirable properties, such as ultraviolet absorbance, high thermal resistance, and mechanical strength. In the present review, we summarize recent progress in metabolic engineering approaches to optimize microbial strains for producing building blocks to synthesize aliphatic and high-performance aromatic polymers.

  13. Building a Genome Engineering Toolbox in Non-Model Prokaryotic Microbes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eckert, Carrie A; Freed, Emily; Smolinski, Sharon

    The realization of a sustainable bioeconomy requires our ability to understand and engineer complex design principles for the development of platform organisms capable of efficient conversion of cheap and sustainable feedstocks (e.g. sunlight, CO2, non-food biomass) to biofuels and bioproducts at sufficient titers and costs. For model microbes such as E. coli, advances in DNA reading and writing technologies are driving adoption of new paradigms for engineering biological systems. Unfortunately, microbes with properties of interest for the utilization of cheap and renewable feedstocks such as photosynthesis, autotrophic growth, and cellulose degradation have very few, if any, genetic tools for metabolicmore » engineering. Therefore, it is important to begin to develop 'design rules' for building a genetic toolbox for novel microbes. Here, we present an overview of our current understanding of these rules for the genetic manipulation of prokaryotic microbes and available genetic tools to expand our ability to genetically engineer non-model systems.« less

  14. Initiation of Research at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1942-05-21

    A group of National Advisory Committee for Aeronautics (NACA) officials and local dignitaries were on hand on May 8, 1942, to witness the Initiation of Research at the NACA's new Aircraft Engine Research Laboratory in Cleveland, Ohio. The group in this photograph was in the control room of the laboratory's first test facility, the Engine Propeller Research Building. The NACA press release that day noted, "First actual research activities in what is to be the largest aircraft engine research laboratory in the world was begun today at the National Advisory Committee for Aeronautics laboratory at the Cleveland Municipal Airport.” The ceremony, however, was largely symbolic since most of the laboratory was still under construction. Dr. George W. Lewis, the NACA's Director of Aeronautical Research, and John F. Victory, NACA Secretary, are at the controls in this photograph. Airport Manager John Berry, former City Manager William Hopkins, NACA Assistant Secretary Ed Chamberlain, Langley Engineer-in-Charge Henry Reid, Executive Engineer Carlton Kemper, and Construction Manager Raymond Sharp are also present. The propeller building contained two torque stands to test complete engines at ambient conditions. The facility was primarily used at the time to study engine lubrication and cooling systems for World War II aircraft, which were required to perform at higher altitudes and longer ranges than previous generations.

  15. EXTERIOR ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    EXTERIOR ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Includes lettering detail for front elevation. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A3 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/21/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  16. SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  17. Energy Engineering Analysis Program, energy survey of Army Industrial Facilities, Western Area Demilitarization Facility Hawthorne Ermy Ammunition Plant Hawthorne, Nevada. Volume 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-17

    This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA03-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status, are listed in Table 1 - 1. The complete scope of work appears in Appendix.« less

  18. Computer Plotting Data Points in the Engine Research Building

    NASA Image and Video Library

    1956-09-21

    A female computer plotting compressor data in the Engine Research Building at the NACA’s Lewis Flight Propulsion Laboratory. The Computing Section was introduced during World War II to relieve short-handed research engineers of some of the tedious data-taking work. The computers made the initial computations and plotted the data graphically. The researcher then analyzed the data and either summarized the findings in a report or made modifications or ran the test again. With the introduction of mechanical computer systems in the 1950s the female computers learned how to encode the punch cards. As the data processing capabilities increased, fewer female computers were needed. Many left on their own to start families, while others earned mathematical degrees and moved into advanced positions.

  19. LPT. Shield test control building (TAN645), north facade. Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test control building (TAN-645), north facade. Camera facing south. Obsolete sign dating from post-1970 program says "Energy and Systems Technology Experimental Facility, INEL." INEEL negative no. HD-40-5-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  20. PBF Reactor Building (PER620). Camera in first basement, facing south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera in first basement, facing south and upward toward main floor. Cable trays being erected. Photographer: Kirsh. Date: May 20, 1969. INEEL negative no. 69-3110 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  1. 2. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, KEY PLAN OF SECOND AND THIRD FLOORS, UNKNOWN DELINEATOR, APRIL 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  2. 1. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, KEY PLAN OF FIRST FLOOR, DRAWN BY D. KORNIT, DECEMBER 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  3. SPERTI Electric Control Building (PER608). Plan, elevations, and details. Gibbs ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Electric Control Building (PER-608). Plan, elevations, and details. Gibbs and Hill, Inc. 1087-PER-608-S5. Date: August 1956. INEEL index no. 760-0608-00-312-108328 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  4. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT OF THE U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS FACILITIES

    EPA Science Inventory

    The Pollution Prevention Opportunity Assessments (PPOA) summarized here were conducted at the following representative Army Corps of Engineers (USAGE) Civil Works facilities: Pittsburgh Engineering Warehouse and Repair Station (PEWARS) and Emsworth Locks and Dams in Pittsburgh, P...

  5. Building on the foundation for an engineering career

    NASA Technical Reports Server (NTRS)

    White, Susan; White, Ruth

    1994-01-01

    A predictable and preventable hurdle stops a majority of young women from entering the scientific and technical fields. This cuts down the individual's career possibilities and cuts in half the pool of potential U.S. engineers later available to industry. The waste of talent does not advance our country's competitive position. The typical American adolescent girl has acquired all the basic mathematical skills needed to pursue science and math, but, from adolescence on, she does not build the foundation of science and math courses that she would need later in life to work in engineering. Several questions are addressed: Why are some young women stopped cold in their mathematical tracks during adolescence? What is the influence of psychology, including discussion of the personality traits quantifiably shared by women in technical fields? and How should the school system adapt to keep their female charges learning math and science?

  6. Designs for Success: Massive Building Project Makes LACCD a Leader in Green Facilities

    ERIC Educational Resources Information Center

    LaVista, Daniel

    2010-01-01

    After a 35-year building hiatus, the nine colleges in the Los Angeles Community College District (LACCD) needed a major facelift. Facilities on LACCD campuses were antiquated and had fallen into disrepair. For years, students voiced dismay, saying their campuses resembled high schools rather than colleges. Inadequate infrastructure drove many…

  7. 8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND BUILDING SECTION, JULY 1992. - Cape Canaveral Air Station, Launch Complex 17, Facility 28425, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  8. Building information modelling review with potential applications in tunnel engineering of China.

    PubMed

    Zhou, Weihong; Qin, Haiyang; Qiu, Junling; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-08-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance.

  9. Building information modelling review with potential applications in tunnel engineering of China

    PubMed Central

    Zhou, Weihong; Qin, Haiyang; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-01-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance. PMID:28878970

  10. Building information modelling review with potential applications in tunnel engineering of China

    NASA Astrophysics Data System (ADS)

    Zhou, Weihong; Qin, Haiyang; Qiu, Junling; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-08-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance.

  11. Multiple Learning Strategies Project. Building Maintenance & Engineering. Regular Vocational. [Vol. 2.

    ERIC Educational Resources Information Center

    Smith, Dwight; And Others

    This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…

  12. PBF Cooling Tower. View from highbay roof of Reactor Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower. View from high-bay roof of Reactor Building (PER-620). Camera faces northwest. East louvered face has been installed. Inlet pipes protrude from fan deck. Two redwood vents under construction at top. Note piping, control, and power lines at sub-grade level in trench leading to Reactor Building. Photographer: Kirsh. Date: June 6, 1969. INEEL negative no. 69-3466 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  13. Development of national standards related to the integrated safety and security of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Voskresenskaya, Elena; Vorona-Slivinskaya, Lubov

    2018-03-01

    The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  14. PBF Cooling Tower Auxiliary Building (PER624) interior. Camera facing north. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower Auxiliary Building (PER-624) interior. Camera facing north. Deluge valves and automatic fire protection piping for Cooling Tower. Photographer: Holmes. Date: May 20, 1970. INEEL negative no. 70-2323 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  15. SPERTI Terminal Building (PER604) with view into interior. Storage tanks ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Terminal Building (PER-604) with view into interior. Storage tanks and equipment in view. Camera facing west. Photographer: R.G. Larsen. Date: May 20, 1955. INEEL negative no. 55-1291 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. PBF Reactor Building (PER620) Cubicle 13. Plan, section, details. Note ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620) Cubicle 13. Plan, section, details. Note "quality assurance" code at bottom of drawing. Aerojet Nuclear Company. Date: May 1976. INEEL index no. 761-0620-00-400-195279 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  17. 3. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, INTERIOR PLAN OF CORBIN HALL, DRAWN BY H. BOSSERT, APRIL 25, 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  18. 8. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, VIEW OF SOUTH FRONT AND EAST SIDE, CORBIN HALL, UNKNOWN DELINEATOR, 1932 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  19. 4. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, PLAN OF NORTH INTERIOR SIDE, DRAWN BY H. BOSSERT, APRIL 25, 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  20. 7. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, SOUTH INTERIOR VIEW, CORBIN HALL, DRAWN BY H.F. BOSSERT, APRIL 24, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  1. 6. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, EXTERIOR DETAIL OF PALLADIAN (SOUTH) WINDOW, CORBIN HALL, UNKNOWN DELINEATOR, JULY 28, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  2. Evaluation of initial collector field performance at the Langley Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Boyle, R. J.; Jensen, R. N.; Knoll, R. H.

    1977-01-01

    The thermal performance of the solar collector field for the NASA Langley Solar Building Test Facility is given for October 1976 through January 1977. A 1,180 square meter solar collector field with seven collector designs helped to provide hot water for the building heating system and absorption air conditioner. The collectors were arranged in 12 rows with nominally 51 collectors per row. Heat transfer rates for each row were calculated and recorded along with sensor, insolation, and weather data every five minutes using a minicomputer. The agreement between the experimental and predicted collector efficiencies was generally within five percentage points.

  3. Evaluation of initial collector field performance at the Langley Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Boyle, R. J.; Knoll, R. H.; Jensen, R. N.

    1977-01-01

    The thermal performance of the solar collector field for the NASA Langley Solar Building Test Facility is given for October 1976 through January 1977. An 1180 square meter solar collector field with seven collector designs helped to provide hot water for the building heating system and absorption air conditioner. The collectors were arranged in 12 rows with nominally 51 collectors per row. Heat transfer rates for each row are calculated and recorded along with sensor, insolation, and weather data every 5 minutes using a mini-computer. The agreement between the experimental and predicted collector efficiencies was generally within five percentage points.

  4. 1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING 771 WAS ONE OF THE FIRST FOUR MAJOR BUILDINGS AT THE ROCKY FLATS PLANT, BUILDING 771 WAS ORIGINALLY THE PRIMARY FACILITY FOR PLUTONIUM OPERATIONS. (5/29/52) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  5. Energy Engineering Analysis Program, energy survey of Army Industrial Facilities, Western Area Demilitarization Facility, Hawthorne Army Ammunition Plant, Hawthorne, Nevada; Volume 1 - energy report. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-17

    This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA05-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status.« less

  6. Multiple Learning Strategies Project. Building Maintenance & Engineering. Low Reader. [Vol. 2.

    ERIC Educational Resources Information Center

    Steinberg, A.; And Others

    This instructional package is one of two designed for low reader students (those reading at grade level 3-6) in the vocational area of building maintenance and engineering. The forty-four learning modules are organized into eleven units: chalkboards; carpet care; office cleaning; grounds; sanitation; boiler maintenance and operation; power and…

  7. Building Great (Coalition) Engineers

    DTIC Science & Technology

    2011-04-01

    36 Engineer May-August 201038 Engineer January-April 1 G’day from the Royal Australian Engineers (RAE) School of Military Engineering (SME) at Steele...Barracks, Moorebank, New South Wales, Austra- lia. Like more than 20 United States Army engineer ma- jors before me, I am the military personnel...exchange pro- gram officer assigned to the United States Army Engineer School, attached to United States Army Pacific, and further attached to SME. By

  8. Systems Check: Community Colleges Turn to Facilities Assessments to Plan Capital Projects and Avoid Expensive Emergency Repairs

    ERIC Educational Resources Information Center

    Joch, Alan

    2014-01-01

    With an emphasis on planning and cutting costs to make better use of resources, facilities managers at community colleges across the nation have undertaken facilities audits usually with the help of outside engineers. Such assessments analyze the history and structural integrity of buildings and core components on campus, including heating…

  9. SPERTI Terminal Building (PER604). Concrete foundation is at grade. Steel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Terminal Building (PER-604). Concrete foundation is at grade. Steel frame has been erected, and some siding has been affixed. Photographer: R.G. Larsen. Date: April 22, 1955. INEEL negative no. 55-1003 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. SPERTI plot plan for control area. Includes Control Building (PER601), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I plot plan for control area. Includes Control Building (PER-601), Gate House (PER-603), well sand settling tank, substation, and septic system. Date: February 1955. INEEL index no. 760-0101-00-396-109104 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  11. PLOT PLAN OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLOT PLAN OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS AND PROPOSED LOCATION OF FUEL ELEMENT CUTTING FACILITY. INL DRAWING NUMBER 200-0603-00-706-051287. ALTERNATE ID NUMBER CPP-C-1287. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  12. 5. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, PLAN OF PALLADIAN (SOUTH) WINDOW DETAIL, CORBIN HALL, DRAWN BY J. COOK, JULY 28, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY

  13. PBF Reactor Building (PER620). Detail of arrangement of highdensity blocks ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Detail of arrangement of high-density blocks and other basement shielding. Date: February 1966. Ebasco Services 1205 PER/PBF 620-A-7. INEEL index no. 761-0620-00-205-123070 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  14. PBF Control Building (PER619). Interior of control room shows control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  15. Value Engineering. "A Working Tool for Cost Control in the Design of Educational Facilities."

    ERIC Educational Resources Information Center

    Lawrence, Jerry

    Value Engineering (VE) is a cost optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. By using VE, the optimum value for every life cycle dollar spent on a facility is obtained by identifying not…

  16. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  17. AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP627) ADJOINING FUEL PROCESSING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP-627) ADJOINING FUEL PROCESSING BUILDING AND EXCAVATION FOR HOT PILOT PLANT TO RIGHT (CPP-640). INL PHOTO NUMBER NRTS-60-1221. J. Anderson, Photographer, 3/22/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  18. Building Management Policy and Procedures for Emergency Preparedness and Facility Coordination for the Ernest Orlando Lawrence Berkeley National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EHS Staff

    2003-04-01

    To ensure efficient and effective management of LBNL facilities, LBNL shall assign line managers to perform appropriate work functions. LBNL divisions that are delegated responsibility for the management of buildings shall designate division personnel to serve as --''Building Managers.''

  19. SPERTI Reactor Pit Building (PER605). Earth shielding protect adjacent Instrument ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Reactor Pit Building (PER-605). Earth shielding protect adjacent Instrument Cell (PER-606). Security fencing surrounds complex, to which gate entry is provided next to Guard House (PER-607). Note gravel road leading to control area. Earth-covered conduit leads from instrument cell to terminal building out of view. Photographer: R.G. Larsen. Date: June 22, 1955. INEEL negative no. 55-1701 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. 75 FR 50945 - Airworthiness Directives; Pratt & Whitney JT8D-209, -217, -217A, -217C, and -219 Turbofan Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... per work-hour. Since this is an added inspection requirement, included as part of the normal...: Docket Management Facility, U.S. Department of Transportation, 1200 New Jersey Avenue, SE., West Building... FURTHER INFORMATION CONTACT: Ian Dargin, Aerospace Engineer, Engine Certification Office, FAA, Engine and...

  1. PBF Reactor Building (PER620). Cubicle 10 detail. Camera facing west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Cubicle 10 detail. Camera facing west toward brick shield wall. Valve stems against wall penetrate through east wall of cubicle. Photographer: John Capek. Date: August 19, 1970. INEEL negative no. 70-3469 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  2. PBF Reactor Building (PER620). Camera in second basement near subpile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera in second basement near sub-pile room (directly below reactor vessel). Door and penetrations lead to sub-pile room. Date: August 15, 1969. Photographer: Larry Page. INEEL negative no. 69-4310 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. PBF Reactor Building (PER620). Camera faces southeast. Concrete placement will ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces southeast. Concrete placement will leave opening for neutron camera to be installed later. Note vertical piping within rebar. Photographer: John Capek. Date: July 6, 1967. INEEL negative no. 67-3514 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  4. PBF Reactor Building (PER620). Aerial view of early construction. Camera ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Aerial view of early construction. Camera facing northwest. Excavation and concrete placement in two basements are underway. Note exposed lava rock. Photographer: Farmer. Date: March 22, 1965. INEEL negative no. 65-2219 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  5. PBF Reactor Building (PER620). Camera facing south end of high ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera facing south end of high bay. Vertical-lift door is being installed. Later, pneumatic seals will be installed around door. Photographer: Kirsh. Date: September 31, 1968. INEEL negative no. 68-3176 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  6. PBF Reactor Building (PER620) as seen from control room window ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620) as seen from control room window in PER-619. Photographer stood just outside window. Note exposed communication cables on desert surface. Date: July 2004. INEEL negative no. HD-41-9-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  7. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    DTIC Science & Technology

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  8. Preliminary Results From a Heavily Instrumented Engine Ice Crystal Icing Test in a Ground Based Altitude Test Facility

    NASA Technical Reports Server (NTRS)

    Flegel, Ashlie B.; Oliver, Michael J.

    2016-01-01

    Preliminary results from the Heavily Instrumented ALF503R-5 Engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory will be discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This model engine, serial number LF01, was used during the inaugural icing test in the PSL facility. The reduction of thrust (rollback) events experienced by this engine in flight were replicated in the facility. Limited instrumentation was used to detect icing. Metal temperature on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect characterize ice accretion, and visualize the ice accretion in the region of interest.

  9. PBF Reactor Building (PER620). Camera faces north into highbay/reactor pit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces north into high-bay/reactor pit area. Inside from for reactor enclosure is in place. Photographer: John Capek. Date: March 15, 1967. INEEL negative no. 67-1769 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. Multiple Learning Strategies Project. Building Maintenance & Engineering. Educable Mentally Impaired. [Vol. 3.

    ERIC Educational Resources Information Center

    Steinberg, Alan; And Others

    This instructional package is one of three designed for educable mentally impaired students in the vocational area of building maintenance and engineering. The thirty-one learning modules are organized into nine units: grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged furniture;…

  11. PBF Control Building (PER619). Interior detail of control room's severe ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. PBF Reactor Building (PER620). Reactor vessel arrives from gate city ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Reactor vessel arrives from gate city steel at door of PBF. On flatbed, it is too high to fit under door. Photographer: Larry Page. Date: February 13, 1970. INEEL negative no. 70-737 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  13. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    NASA Technical Reports Server (NTRS)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

  14. The challenge of logistics facilities development

    NASA Technical Reports Server (NTRS)

    Davis, James R.

    1987-01-01

    The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

  15. 2. SITE BUILDING 002 SCANNER BUILDING VIEW IS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SITE BUILDING 002 - SCANNER BUILDING - VIEW IS LOOKING NORTH 80° WEST "B" FACE ALONG BUILDING "A" FACE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  16. An approach in building a chemical compound search engine in oracle database.

    PubMed

    Wang, H; Volarath, P; Harrison, R

    2005-01-01

    A searching or identifying of chemical compounds is an important process in drug design and in chemistry research. An efficient search engine involves a close coupling of the search algorithm and database implementation. The database must process chemical structures, which demands the approaches to represent, store, and retrieve structures in a database system. In this paper, a general database framework for working as a chemical compound search engine in Oracle database is described. The framework is devoted to eliminate data type constrains for potential search algorithms, which is a crucial step toward building a domain specific query language on top of SQL. A search engine implementation based on the database framework is also demonstrated. The convenience of the implementation emphasizes the efficiency and simplicity of the framework.

  17. PBF Reactor Building (PER620). Cubicle 10 area in basement. Highdensity ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Cubicle 10 area in basement. High-density shielding bricks will protect personnel from radiation coming from in-pile-tube coolant and blowdown tank. Photographer: John Capek. Date: January 26, 1970. INEEL negative no. 70-348 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  18. PBF Control Building (PER619) floor plan and elevations. Room numbers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619) floor plan and elevations. Room numbers and functions. Roof plans for "high" roof and rest of roof. Ebasco Services 1205-PER/PER 619-A-1. Date: July 1965. INEEL index no. 760-0619-00-205-123022 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  19. SPERTI Control Building (PER601) interior. Control panel with data readout ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Control Building (PER-601) interior. Control panel with data readout equipment in control room. Panels and equipment were fabricated elsewhere at NRTS during SPERT-I construction. Photographer: R.G. Larsen. Date: November 21, 1955. INEEL negative no. 55-3208 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. SPERT1. Contextual aerial view of SPERTI Reactor Pit Building (PER605) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-1. Contextual aerial view of SPERT-I Reactor Pit Building (PER-605) at top of view, and its accessories: the earth-shielded instrument cell (PER-606) immediately adjacent to it; the Guard House (PER-607) to its right; and the Terminal Building in lower center of view (PER-604). Camera faces west. Road and buried line leaving view at right lead to Control Building (PER-601) out of view. Sagebrush vegetation has been scraped from around buildings. Photographer: R.G. Larsen. Date: June 6, 1955. INEEL negative no. 55-1477. - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  1. 11. SITE BUILDING 002 SCANNER BUILDING EVAPORATIVE COOLING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. SITE BUILDING 002 - SCANNER BUILDING - EVAPORATIVE COOLING TOWER SYSTEM IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. EMS Activations for School-Aged Children From Public Buildings, Places of Recreation or Sport, and Health Care Facilities in Pennsylvania.

    PubMed

    Catherine, Andrew T; Olympia, Robert P

    2016-06-01

    To determine the etiology of emergency medical services (EMS) activations in 2011 to public buildings, places of recreation or sport, and health care facilities involving children aged 5 to 18 years in Pennsylvania. Electronic records documenting 2011 EMS activations as provided by the Pennsylvania Department of Health's Bureau of EMS were reviewed. Data elements (demographics, dispatch complaint, mechanism of injury, primary assessment) from patients aged 5 to 18 years involved in an EMS response call originating from either a public building, a place of recreation and sport, or health care facility were analyzed. A total of 12,289 records were available for analysis. The most common primary assessments from public buildings were traumatic injury, behavioral/psychiatric disorder, syncope/fainting, seizure, and poisoning. The most common primary assessments from places of recreation or sport were traumatic injury, syncope/fainting, altered level of consciousness, respiratory distress, and abdominal pain. The most common primary assessments from health care facilities were behavioral/psychiatric disorder, traumatic injury, abdominal pain, respiratory distress, and syncope/fainting. When examining the mechanism of injury for trauma-related primary assessments, falls were the most common mechanism at all 3 locations, followed by being struck by an object. Of the 1335 serious-incident calls (11% of the total EMS activations meeting inclusion criteria), 61.2% were from public buildings, 14.1% from places of recreation or sport, and 24.7% from health care facilities. Our identification of common EMS dispatch complaints, mechanisms of injury, and primary assessments can be used in the education of staff and preparation of facilities for medical emergencies and injuries where children spend time.

  3. Waste Technology Engineering Laboratory (324 building)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kammenzind, D.E.

    The 324 Facility Standards/Requirements Identification Document (S/RID) is comprised of twenty functional areas. Two of the twenty functional areas (Decontamination and Decommissioning and Environmental Restoration) were determined as nonapplicable functional areas and one functional area (Research and Development and Experimental Activities) was determined applicable, however, requirements are found in other functional areas and will not be duplicated. Each functional area follows as a separate chapter, either containing the S/RID or a justification for nonapplicability. The twenty functional areas listed below follow as chapters: 1. Management Systems; 2. Quality Assurance; 3. Configuration Management; 4. Training and Qualification; 5. Emergency Management; 6.more » Safeguards and Security; 7. Engineering Program; 8. Construction; 9. Operations; 10. Maintenance; 11. Radiation Protection; 12. Fire Protection; 13. Packaging and Transportation; 14. Environmental Restoration; 15. Decontamination and Decommissioning; 16. Waste Management; 17. Research and Development and Experimental Activities; 18. Nuclear Safety; 19. Occupational Safety and Health; 20. Environmental Protection.« less

  4. FAST CHOPPER BUILDING, TRA665. CONTEXTUAL VIEW: CHOPPER BUILDING IN CENTER. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FAST CHOPPER BUILDING, TRA-665. CONTEXTUAL VIEW: CHOPPER BUILDING IN CENTER. MTR REACTOR SERVICES BUILDING,TRA-635, TO LEFT; MTR BUILDING TO RIGHT. CAMERA FACING WEST. INL NEGATIVE NO. HD42-1. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  5. Establishment of a National Accelerator Facility: Design and construction phase

    NASA Astrophysics Data System (ADS)

    1981-06-01

    The main components of an accelerator facility for nuclear physics, isotope production, and radiotherapy in South Africa are in 8-MeV solid pole injector cyclotron and a separated sector cyclotron with a k-value of 200 MeV. Progress made in the development of the light ion injector and in the design of the control and beam transport systems is described. Mechanical and engineering tasks associated with component manufacture are discussed as well as the construction of the building to house the facility and the installation of necessary services.

  6. 2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING 444 WAS THE PRIMARY NON-PLUTONIUM MANUFACTURING FACILITY AT THE ROCKY FLATS PLANT. MANUFACTURING PROCESSES COMPLETED IN THIS BUILDING WERE USED TO FABRICATE WEAPONS COMPONENTS AND ASSEMBLIES FOR A VARIETY OF MATERIALS, INCLUDING DEPLETED URANIUM, BERYLLIUM, STAINLESS STEEL, ALUMINUM, AND VANADIUM. (4/25/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  7. PBF Cooling Tower (PER720), and Auxiliary Building (PER624). Camera faces ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower (PER-720), and Auxiliary Building (PER-624). Camera faces north to show south facades. Oblong vertical structure at left of center is weather shield for stairway. Date: August 2003. INEEL negative no. HD-35-10-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  8. PBF Reactor Building (PER620). Detail of fuel test assembly in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Detail of fuel test assembly in preparation for test. When complete, it will fit into in-pile tube. The maximum outside diameter of which must be about 8.25 inches. Date: 1982. INEEL negative no. 82-4908 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  9. PBF Reactor Building (PER620). Camera is facing east and down ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera is facing east and down into canal and storage pit for fuel rod assemblies. Stainless steel liner is being applied, temporarily covered with plywood for protection. Photographer: John Capek. Date: August 29, 1969. INEEL negative no. 69-4641 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. PBF Reactor Building (PER620). Cubicle 10. Camera facing southeast. Loop ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Cubicle 10. Camera facing southeast. Loop pressurizer on right. Other equipment includes loop strained, control valves, loop piping, pressurizer interchanger, and cleanup system cooler. High-density shielding brick walls. Photographer: Kirsh. Date: November 2, 1970. INEEL negative no. 70-4908 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  11. PBF Control Building (PER619). Interior of control room. Control console ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. Resolution of sick building syndrome in a high-security facility.

    PubMed

    Hiipakka, D W; Buffington, J R

    2000-08-01

    The main objective of this article is to serve as a case study for other industrial hygiene (IH) professionals' review as a "real world" effort in responding to a facility perceived as "sick" by its occupants. As many industrial hygienists do not have extensive backgrounds in evaluating microbial air contaminants or the mechanical function of building HVAC units, the overall intent is to provide "lessons learned" to IH generalists who may be asked to participate in indoor environmental quality (IEQ) surveys. In September 1994, a suspected case of "sick building syndrome" was investigated (with significant airborne fungal loads confirmed) at a communications center after numerous occupants reported upper respiratory disease and/or allergy-type symptoms. The setting was a two-story structure approximately 30 years old, with a normal occupancy load of 350 to 400 persons. In addition to continual structural modifications, the central HVAC air conditioning systems had poor maintenance histories. Inspection of HVAC components revealed visible fungal growth on air filters and air ducts and in cooling fan condensate drip pans. Fungal air samples were collected with an Anderson N6 air sampler and Sabouraund dextrose agar media. Over a study period of 23 months, three rounds of 26 air samples were collected for 5 minutes each at 28.3 liters/minute airflow. Cultures exhibited fungi such as Aspergillus, Penicillium, Alternaria, and Cladosporium. Certain strains of these fungi produce mycotoxins that may cause a variety of deleterious health effects such as those described by occupants. Initial 1994 airborne fungal concentrations ranged from 85 to 6157 colony forming units (CFUs) per cubic meter of sampled air (CFU/m3). Some investigators have reported fungal concentrations as low as 245 CFU/m3 associated with complaint sites in other buildings. Remediation efforts involved hiring a dedicated mechanic to implement a HVAC preventive maintenance program (including regular

  14. 18. SITE BUILDING 002 SCANNER BUILDING VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. SITE BUILDING 002 - SCANNER BUILDING - VIEW OF SITE SECURITY OFFICE ACCESS DOOR FROM EXTERIOR OF OFFICE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  15. Building a Sustained School Facilities Remedy: Arizona's Innovative Blueprint for Capital Funding. Education, Equity, and the Law. No. 3

    ERIC Educational Resources Information Center

    Hunter, Molly A.

    2010-01-01

    For over ten years, the State of Arizona has implemented an innovative statewide process for financing and building school facilities and purchasing other capital items for its schools. Spawned by an education quality lawsuit, the 1998 Students FIRST Act established the School Facilities Board, which succeeded in helping rural, suburban, and urban…

  16. Scientific and Engineering Research Facilities at Colleges and Universities, 1998. Topical Report.

    ERIC Educational Resources Information Center

    National Science Foundation, Arlington, VA. Div. of Science Resources Studies.

    On a biennial basis since 1986, the National Science Foundation (NSF) has collected data on issues related to Science and Engineering (S&E) research facilities at U.S. colleges, universities, and biomedical institutions. This report presents the major findings from the 1998 survey and provides a summary of the changes that took place between…

  17. Final Report on the Audit of Architect-Engineer Contracting at the Officer in Charge of Construction, Naval Facilities Engineering Command Contracts, Mediterranean, Madrid, Spain

    DTIC Science & Technology

    1990-11-30

    This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include

  18. 24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  19. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  20. Building Energy Audit Report, for Hickam AFB, HI

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; De La Rosa, Marcus I.; Brown, Daryl R.

    2010-09-30

    A building energy assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Department of Energy/Federal Energy Management program (FEMP). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at Hickam AFB, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings. This documents reports the results of that assessment.

  1. Options to improve energy efficiency for educational building

    NASA Astrophysics Data System (ADS)

    Jahan, Mafruha

    The cost of energy is a major factor that must be considered for educational facility budget planning purpose. The analysis of energy related issues and options can be complex and requires significant time and detailed effort. One way to facilitate the inclusion of energy option planning in facility planning efforts is to utilize a tool that allows for quick appraisal of the facility energy profile. Once such an appraisal is accomplished, it is then possible to rank energy improvement options consistently with other facility needs and requirements. After an energy efficiency option has been determined to have meaningful value in comparison with other facility planning options, it is then possible to utilize the initial appraisal as the basis for an expanded consideration of additional facility and energy use detail using the same analytic system used for the initial appraisal. This thesis has developed a methodology and an associated analytic model to assist in these tasks and thereby improve the energy efficiency of educational facilities. A detailed energy efficiency and analysis tool is described that utilizes specific university building characteristics such as size, architecture, envelop, lighting, occupancy, thermal design which allows reducing the annual energy consumption. Improving the energy efficiency of various aspects of an educational building's energy performance can be complex and can require significant time and experience to make decisions. The approach developed in this thesis initially assesses the energy design for a university building. This initial appraisal is intended to assist administrators in assessing the potential value of energy efficiency options for their particular facility. Subsequently this scoping design can then be extended as another stage of the model by local facility or planning personnel to add more details and engineering aspects to the initial screening model. This approach can assist university planning efforts to

  2. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  3. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  4. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  5. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  6. PBF Reactor Building (PER620) under construction. Aerial view with camera ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620) under construction. Aerial view with camera facing northeast. Steel framework is exposed for west wing and high bay. Concrete block siding on east wing. Railroad crane set up on west side. Note trenches proceeding from front of building. Left trench is for secondary coolant and will lead to Cooling Tower. Shorter trench will contain cables leading to control area. Photographer: Larry Page. Date: March 22, 1967. INEEL negative no. 67-5025 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  7. 23. SITE BUILDING 002 SCANNER BUILDING RADAR CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. SITE BUILDING 002 - SCANNER BUILDING - RADAR CONTROL INTERFACE "RCL NO. 2" WITH COMPUTER CONTROL DISC DRIVE UNITS IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. US Naval Facilities Engineering Service Center Environmental Program on Climate Change

    DTIC Science & Technology

    2008-09-01

    of environmental issues related to climate change . There is a growing recognition that the Navy will need to perform its national security mission in... climate change -related technology work at the Naval Facilities Engineering Service Center (NAVFAC ESC) in Port Hueneme, California. NAVFAC ESC...categorized technologies that can be applied to climate change as mitigation, adaptation, and intervention. An essential element of the Navy’s response to

  9. Lightning Protection System for HE Facilities at LLNL - Certification Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clancy, T J; Ong, M M; Brown, C G

    2005-12-08

    This document is meant as a template to assist in the development of your own lighting certification process. Aside from this introduction and the mock representative name of the building (Building A), this document is nearly identical to a lightning certification report issued by the Engineering Directorate at Lawrence Livermore National Laboratory. At the date of this release, we have certified over 70 HE processing and storage cells at our Site 300 facilities. In Chapters 1 and 2 respectively, we address the need and methods of lightning certification for HE processing and storage facilities at LLNL. We present the preferredmore » method of lightning protection in Chapter 3, as well as the likely building modifications that are needed to comply with this method. In Chapter 4, we present the threat assessment and resulting safe work areas within a cell. After certification, there may be changes to operations during a lightning alert, and this is discussed in Chapter 5. Chapter 6 lists the maintenance requirements for the continuation of lighting certification status. Appendices of this document are meant as an aid in developing your own certification process, and they include a bonding list, an inventory of measurement equipment, surge suppressors in use at LLNL, an Integrated Work and Safety form (IWS), and a template certification sign-off sheet. The lightning certification process involves more that what is spelled out in this document. The first steps involve considerable planning, the securing of funds, and management and explosives safety buy-in. Permits must be obtained, measurement equipment must be assembled and tested, and engineers and technicians must be trained in their use. Cursory building inspections are also recommended, and surge suppression for power systems must be addressed. Upon completion of a certification report and its sign-off by management, additional work is required. Training will be needed in order to educate workers and facility

  10. Building a Foundation for Success: How Authorizers Can Help Schools with the Facilities Challenge. Authorizer Issue Brief. Number 2

    ERIC Educational Resources Information Center

    Halsband, Robin; Hassel, Bryan C.

    2004-01-01

    One of the single biggest challenges for a charter school is securing financing for an adequate facility. While a stellar building provides no guarantee that a school will be a success, having adequate facilities that at least meet the needs of an academic program without robbing the budget can go a long way toward creating an environment…

  11. Accelerator boom hones China's engineering expertise

    NASA Astrophysics Data System (ADS)

    Normile, Dennis

    2018-02-01

    In raising the curtain on the China Spallation Neutron Source, China has joined just four other nations in having mastered the technology of accelerating and controlling beams of protons. The $277 million facility, set to open to users this spring in Dongguan, is expected to yield big dividends in materials science, chemistry, and biology. More world class machines are on the way, as China this year starts construction on four other major accelerator facilities. The building boom is prompting a scramble to find enough engineers and technicians to finish the projects. But if they all come off as planned, the facilities would position China to tackle the next global megaproject: a giant accelerator that would pick up where Europe's Large Hadron Collider leaves off.

  12. Survey of Secondary School Principals: Building Engineer Reporting Line Change. Report No. 8425.

    ERIC Educational Resources Information Center

    Farber, Irvin J.; Lytle, James H.

    This paper reports the results of a questionnaire distributed to all Philadelphia secondary school principals (with returns from 68 percent), eliciting their reactions to various aspects of the transfer to them of line authority for building engineers. Responses indicate that the process of assuming supervisory responsibility was not yet complete,…

  13. Decision Analysis with Value Focused Thinking as a Methodology to Select Buildings for Deconstruction

    DTIC Science & Technology

    2007-03-01

    Congress Facility 7366 30251 Hazardous Material Storage Shed 432 20447 Aircraft Research Lab 1630 20449 Aircraft Research Lab 2480 34042 Reserve Forces...Congress Facility 0.566 20055 Engineering Admin. Building 0.578 20449 Aircraft Research Lab 0.595 20447 Aircraft Research Lab 0.605 20464...0.525 $39.00 0.01346 20447 Aircraft Research Lab 0.605 $59.50 0.01017 20449 Aircraft Research Lab 0.595 $62.40 0.00954 20464 Area B Gas Station

  14. Facilities | Argonne National Laboratory

    Science.gov Websites

    Skip to main content Argonne National Laboratory Toggle Navigation Toggle Search Research Facilities Advanced Powertrain Research Facility Center for Transportation Research Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Materials Engineering Research Facility

  15. Advanced human-machine interface for collaborative building control

    DOEpatents

    Zheng, Xianjun S.; Song, Zhen; Chen, Yanzi; Zhang, Shaopeng; Lu, Yan

    2015-08-11

    A system for collaborative energy management and control in a building, including an energy management controller, one or more occupant HMIs that supports two-way communication between building occupants and a facility manager, and between building occupants and the energy management controller, and a facility manager HMI that supports two-way communication between the facility manager and the building occupants, and between the facility manager and the energy management controller, in which the occupant HMI allows building occupants to provide temperature preferences to the facility manager and the energy management controller, and the facility manager HMI allows the facility manager to configure an energy policy for the building as a set of rules and to view occupants' aggregated temperature preferences, and the energy management controller determines an optimum temperature range that resolves conflicting occupant temperature preferences and occupant temperature preferences that conflict with the facility manager's energy policy for the building.

  16. Advancing Integrated STEM Learning through Engineering Design: Sixth-Grade Students' Design and Construction of Earthquake Resistant Buildings

    ERIC Educational Resources Information Center

    English, Lyn D.; King, Donna; Smeed, Joanna

    2017-01-01

    As part of a 3-year longitudinal study, 136 sixth-grade students completed an engineering-based problem on earthquakes involving integrated STEM learning. Students employed engineering design processes and STEM disciplinary knowledge to plan, sketch, then construct a building designed to withstand earthquake damage, taking into account a number of…

  17. Building 'blue': An eco-engineering framework for foreshore developments.

    PubMed

    Mayer-Pinto, M; Johnston, E L; Bugnot, A B; Glasby, T M; Airoldi, L; Mitchell, A; Dafforn, K A

    2017-03-15

    Urbanisation in terrestrial systems has driven architects, planners, ecologists and engineers to collaborate on the design and creation of more sustainable structures. Examples include the development of 'green infrastructure' and the introduction of wildlife corridors that mitigate urban stressors and provide positive ecological outcomes. In contrast, efforts to minimise the impacts of urban developments in marine environments have been far more restricted in their extent and scope, and have often overlooked the ecological role of the built environment as potential habitat. Urban foreshore developments, i.e. those built on the interface of intertidal and/or subtidal zones, have the potential to incorporate clear multi-functional outcomes, by supporting novel ecosystems. We present a step-by-step eco-engineering framework for 'building blue' that will allow coastal managers to facilitate planning and construction of sustainable foreshore developments. Adopting such an approach will incorporate ecological principles, thereby mitigating some of the environmental impacts, creating more resilient urban infrastructure and environments, and maximising benefits to the multiple stakeholders and users of marine urban waterfronts. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. High-temperature test facility at the NASA Lewis engine components research laboratory

    NASA Technical Reports Server (NTRS)

    Colantonio, Renato O.

    1990-01-01

    The high temperature test facility (HTTF) at NASA-Lewis Engine Components Research Laboratory (ECRL) is presently used to evaluate the survivability of aerospace materials and the effectiveness of new sensing instrumentation in a realistic afterburner environment. The HTTF has also been used for advanced heat transfer studies on aerospace components. The research rig uses pressurized air which is heated with two combustors to simulate high temperature flow conditions for test specimens. Maximum airflow is 31 pps. The HTTF is pressure rated for up to 150 psig. Combustors are used to regulate test specimen temperatures up to 2500 F. Generic test sections are available to house test plates and advanced instrumentation. Customized test sections can be fabricated for programs requiring specialized features and functions. The high temperature test facility provides government and industry with a facility for testing aerospace components. Its operation and capabilities are described.

  19. Future aerospace ground test facility requirements for the Arnold Engineering Development Center

    NASA Technical Reports Server (NTRS)

    Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.

    1992-01-01

    Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.

  20. 5. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 90MM STANDARD LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. 8. SHEET 2, CONTROL HOUSE FOR DRY DOCK. United Engineering ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. SHEET 2, CONTROL HOUSE FOR DRY DOCK. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. 2 of 2 sheets, Plan no. 10,507. Various scales. January 4, 1943, last revised 1/19/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Control House for Dry Dock, 2900 Main Street, Alameda, Alameda County, CA

  2. NREL Buildings Research Video

    ScienceCinema

    None

    2017-12-09

    Through research, the National Renewable Energy Laboratory (NREL) has developed many strategies and design techniques to ensure both commercial and residential buildings use as little energy as possible and also work well with the surroundings. Here you will find a video that introduces the work of NREL Buildings Research, highlights some of the facilities on the NREL campus, and demonstrates these efficient building strategies. Watch this video to see design highlights of the Science and Technology Facility on the NREL campus—the first Federal building to be LEED® Platinum certified. Additionally, the video demonstrates the energy-saving features of NRELs Thermal Test Facility.

  3. Calculating Solar Energy Potential of Buildings and Visualization Within Unity 3d Game Engine

    NASA Astrophysics Data System (ADS)

    Buyuksalih, G.; Bayburt, S.; Baskaraca, A. P.; Karim, H.; Rahman, A. Abdul

    2017-10-01

    Solar energy modelling is increasingly popular, important, and economic significant in solving energy crisis for big cities. It is a clean and renewable resource of energy that can be utilized to accommodate individual or group of buildings electrical power as well as for indoor heating. Implementing photovoltaic system (PV) in urban areas is one of the best options to solve power crisis over expansion of urban and the growth of population. However, as the spaces for solar panel installation in cities are getting limited nowadays, the available strategic options are only at the rooftop and façade of the building. Thus, accurate information and selecting building with the highest potential solar energy amount collected is essential in energy planning, environmental conservation, and sustainable development of the city. Estimating the solar energy/radiation from rooftop and facade are indeed having a limitation - the shadows from other neighbouring buildings. The implementation of this solar estimation project for Istanbul uses CityGML LoD2-LoD3. The model and analyses were carried out using Unity 3D Game engine with development of several customized tools and functionalities. The results show the estimation of potential solar energy received for the whole area per day, week, month and year thus decision for installing the solar panel could be made. We strongly believe the Unity game engine platform could be utilized for near future 3D mapping visualization purposes.

  4. 6. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 65MM WIDE ANGLE LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. AMERICAN STANDARD SPECIFICATIONS FOR MAKING BUILDINGS AND FACILITIES ACCESSIBLE TO, AND USABLE BY, THE PHYSICALLY HANDICAPPED.

    ERIC Educational Resources Information Center

    National Easter Seal Society for Crippled Children and Adults, Chicago, IL.

    THIS STANDARD IS INTENDED TO PROVIDE MINIMUM REQUIREMENTS TO BE USED IN THE CONSTRUCTION OF ALL BUILDINGS AND FACILITIES AND FOR ADOPTION AND ENFORCEMENT BY ADMINISTRATIVE AUTHORITIES IN ORDER TO ALLOW INDIVIDUALS WITH PERMANENT PHYSICAL DISABILITIES TO PURSUE THEIR INTERESTS AND ASPIRATIONS, DEVELOP THEIR TALENTS, AND EXERCISE THEIR SKILLS.…

  6. Challenges and Opportunities: Building a Relationship Between a Department of Biomedical Engineering and a Medical School.

    PubMed

    George, Steven C; Meyerand, M Elizabeth

    2017-03-01

    A department of biomedical engineering can significantly enhance the impact of their research and training programs if a productive relationship with a medical school can be established. In order to develop such a relationship, significant hurdles must be overcome. This editorial summarizes some of the major challenges and opportunities for a department of biomedical engineering as they seek to build or enhance a relationship with a medical school. The ideas were formulated by engaging the collective wisdom from the Council of Chairs of the biomedical engineering departments.

  7. Preliminary Results From a Heavily Instrumented Engine Ice Crystal Icing Test in a Ground Based Altitude Test Facility

    NASA Technical Reports Server (NTRS)

    Flegel, Ashlie B.; Oliver, Michael J.

    2016-01-01

    Preliminary results from the heavily instrumented ALF502R-5 engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory are discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This same model engine, serial number LF01, was used during the inaugural icing test in the Propulsion Systems Laboratory facility. The uncommanded reduction of thrust (rollback) events experienced by this engine in flight were simulated in the facility. Limited instrumentation was used to detect icing on the LF01 engine. Metal temperatures on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect/ characterize ice accretion, and visualize the ice accretion in the region of interest. Data were acquired at key LF01 test points and additional points that explored: icing threshold regions, low altitude, high altitude, spinner heat effects, and the influence of varying the facility and engine parameters. For each condition of interest, data were obtained from some selected variations of ice particle median volumetric diameter, total water content, fan speed, and ambient temperature. For several cases the NASA in-house engine icing risk assessment code was used to find conditions that would lead to a rollback event. This study further helped NASA develop necessary icing diagnostic instrumentation, expand the capabilities of the Propulsion Systems Laboratory, and generate a dataset that will be used to develop and validate in-house icing prediction and risk mitigation computational tools. The ice accretion on the outer shroud region was acquired by internal video cameras. The heavily instrumented engine showed good repeatability of icing responses when compared to the key LF01 test points and during day-to-day operation. Other noticeable

  8. Preliminary Results From a Heavily Instrumented Engine Ice Crystal Icing Test in a Ground Based Altitude Test Facility

    NASA Technical Reports Server (NTRS)

    Flegel, Ashlie B.; Oliver, Michael J.

    2016-01-01

    Preliminary results from the heavily instrumented ALF502R-5 engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory are discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This same model engine, serial number LF01, was used during the inaugural icing test in the Propulsion Systems Laboratory facility. The uncommanded reduction of thrust (rollback) events experienced by this engine in flight were simulated in the facility. Limited instrumentation was used to detect icing on the LF01 engine. Metal temperatures on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect/characterize ice accretion, and visualize the ice accretion in the region of interest. Data were acquired at key LF01 test points and additional points that explored: icing threshold regions, low altitude, high altitude, spinner heat effects, and the influence of varying the facility and engine parameters. For each condition of interest, data were obtained from some selected variations of ice particle median volumetric diameter, total water content, fan speed, and ambient temperature. For several cases the NASA in-house engine icing risk assessment code was used to find conditions that would lead to a rollback event. This study further helped NASA develop necessary icing diagnostic instrumentation, expand the capabilities of the Propulsion Systems Laboratory, and generate a dataset that will be used to develop and validate in-house icing prediction and risk mitigation computational tools. The ice accretion on the outer shroud region was acquired by internal video cameras. The heavily instrumented engine showed good repeatability of icing responses when compared to the key LF01 test points and during day-to-day operation. Other noticeable

  9. Former President George H.W. Bush paid a visit to NASA's Johnson Space Center to speak with Expedition 46 Commander Scott Kelly and Flight Engineer Tim Kopra and take a tour of the Space Vehicle Mockup Facility. Kelly���s twin brother, Mark Kelly and his wife, former Congresswoman Gabrielle Giffords were also present. Photo Date: February 5, 2016. Location: Building 30 - ISS Flight Control Room. Photographer: Robert Markowitz

    NASA Image and Video Library

    2016-02-05

    Former President George H.W. Bush paid a visit to NASA's Johnson Space Center to speak with Expedition 46 Commander Scott Kelly and Flight Engineer Tim Kopra and take a tour of the Space Vehicle Mockup Facility. Kelly’s twin brother, Mark Kelly and his wife, former Congresswoman Gabrielle Giffords were also present. Photo Date: February 5, 2016. Location: Building 30 - ISS Flight Control Room. Photographer: Robert Markowitz

  10. PBF Reactor Building (PER620). Camera faces south toward verticallift door, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces south toward vertical-lift door, which is closed. Note crane and its trolley positioned near door; its rails along side walls. Reactor vessel and lifting beams are positioned above reactor pit. Photographer: John Capek. Date: January 9, 1970. INEEL negative no. 70-132 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  11. PBF Reactor Building (PER620). Camera is in cab of electricpowered ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera is in cab of electric-powered rail crane and facing east. Reactor pit and storage canal have been shaped. Floors for wings on east and west side are above and below reactor in view. Photographer: Larry Page. Date: August 23, 1967. INEEL negative no. 67-4403 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an abovegroundmore » structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)« less

  13. Engineering the extracellular environment: Strategies for building 2D and 3D cellular structures.

    PubMed

    Guillame-Gentil, Orane; Semenov, Oleg; Roca, Ana Sala; Groth, Thomas; Zahn, Raphael; Vörös, Janos; Zenobi-Wong, Marcy

    2010-12-21

    Cell fate is regulated by extracellular environmental signals. Receptor specific interaction of the cell with proteins, glycans, soluble factors as well as neighboring cells can steer cells towards proliferation, differentiation, apoptosis or migration. In this review, approaches to build cellular structures by engineering aspects of the extracellular environment are described. These methods include non-specific modifications to control the wettability and stiffness of surfaces using self-assembled monolayers (SAMs) and polyelectrolyte multilayers (PEMs) as well as methods where the temporal activation and spatial distribution of adhesion ligands is controlled. Building on these techniques, construction of two-dimensional cell sheets using temperature sensitive polymers or electrochemical dissolution is described together with current applications of these grafts in the clinical arena. Finally, methods to pattern cells in three-dimensions as well as to functionalize the 3D environment with biologic motifs take us one step closer to being able to engineer multicellular tissues and organs. Copyright © 2010 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  14. Cumulative metal leaching from utilisation of secondary building materials in river engineering.

    PubMed

    Leuven, R S E W; Willems, F H G

    2004-01-01

    The present paper estimates the utilisation of bulky wastes (minestone, steel slag, phosphorus slag and demolition waste) in hydraulic engineering structures in Dutch parts of the rivers Rhine, Meuse and Scheldt over the period 1980-2025. Although they offer several economic, technical and environmental benefits, these secondary building materials contain various metals that may leach into river water. A leaching model was used to predict annual emissions of arsenic, cadmium, copper, chromium, lead, mercury, nickel and zinc. Under the current utilisation and model assumptions, the contribution of secondary building materials to metal pollution in Dutch surface waters is expected to be relatively low compared to other sources (less than 0.1% and 0.2% in the years 2000 and 2025, respectively). However, continued and widespread large-scale applications of secondary building materials will increase pollutant leaching and may require further cuts to be made in emissions from other sources to meet emission reduction targets and water quality standards. It is recommended to validate available leaching models under various field conditions. Complete registration of secondary building materials will be required to improve input data for leaching models.

  15. 25. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1930 ZULU TIME, 26 OCTOBER, 1999. MWOC SCREEN ALSO SHOWS RADAR "FACE A" AND "FACE B" ACTIVE STATUS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  16. 10. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT SOUTHWEST CORNER "B" FACE AND "C" FACE ON WEST AND EVAPORATIVE COOLING TOWER AT NORTH. VIEW IS LOOKING NORTH 45° EAST. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  17. 19. SITE BUILDING 002 SCANNER BUILDING AIR POLICE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. SITE BUILDING 002 - SCANNER BUILDING - AIR POLICE SITE SECURITY OFFICE WITH "SITE PERIMETER STATUS PANEL" AND REAL TIME VIDEO DISPLAY OUTPUT FROM VIDEO CAMERA SYSTEM AT SECURITY FENCE LOCATIONS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. 34. SITE BUILDING 002 SCANNER BUILDING ROOM 105 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. SITE BUILDING 002 - SCANNER BUILDING - ROOM 105 - CHILLER ROOM, SHOWING SINGLE COMPRESSOR, LIQUID CHILLERS AND "CHILLED WATER RETURN", COOLING TOWER 'TOWER WATER RETURN" AND 'TOWER WATER SUPPLY" LINES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  19. XML Based Scientific Data Management Facility

    NASA Technical Reports Server (NTRS)

    Mehrotra, Piyush; Zubair, M.; Ziebartt, John (Technical Monitor)

    2001-01-01

    The World Wide Web consortium has developed an Extensible Markup Language (XML) to support the building of better information management infrastructures. The scientific computing community realizing the benefits of HTML has designed markup languages for scientific data. In this paper, we propose a XML based scientific data management facility, XDMF. The project is motivated by the fact that even though a lot of scientific data is being generated, it is not being shared because of lack of standards and infrastructure support for discovering and transforming the data. The proposed data management facility can be used to discover the scientific data itself, the transformation functions, and also for applying the required transformations. We have built a prototype system of the proposed data management facility that can work on different platforms. We have implemented the system using Java, and Apache XSLT engine Xalan. To support remote data and transformation functions, we had to extend the XSLT specification and the Xalan package.

  20. XML Based Scientific Data Management Facility

    NASA Technical Reports Server (NTRS)

    Mehrotra, P.; Zubair, M.; Bushnell, Dennis M. (Technical Monitor)

    2002-01-01

    The World Wide Web consortium has developed an Extensible Markup Language (XML) to support the building of better information management infrastructures. The scientific computing community realizing the benefits of XML has designed markup languages for scientific data. In this paper, we propose a XML based scientific data management ,facility, XDMF. The project is motivated by the fact that even though a lot of scientific data is being generated, it is not being shared because of lack of standards and infrastructure support for discovering and transforming the data. The proposed data management facility can be used to discover the scientific data itself, the transformation functions, and also for applying the required transformations. We have built a prototype system of the proposed data management facility that can work on different platforms. We have implemented the system using Java, and Apache XSLT engine Xalan. To support remote data and transformation functions, we had to extend the XSLT specification and the Xalan package.

  1. Science Facilities Bibliography.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…

  2. 18. VIEW OF ENGINEERING CONTROLS USED IN THE BERYLLIUM SHOP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW OF ENGINEERING CONTROLS USED IN THE BERYLLIUM SHOP TO REDUCE EMPLOYEE EXPOSURE. THE LATHE IS COVERED BY A HOOD WITH A SEPARATE AIR-HANDLING SYSTEM. PRECISION EQUIPMENT IS CONTROLLED DIGITALLY. (11/13/89) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  3. ETR HEAT EXCHANGER BUILDING, TRA644. METAL FRAME OF BUILDING GOES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR HEAT EXCHANGER BUILDING, TRA-644. METAL FRAME OF BUILDING GOES UP IN BACKGROUND AS WORKERS PLACE A SECTION OF WATER LINE THAT WILL CARRY SECONDARY COOLANT BETWEEN HEAT EXCHANGER BUILDING AND THE COOLING TOWER. INL NEGATIVE NO. 56-2205. Jack L. Anderson, Photographer, 6/28/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  4. ETRMTR MECHANICAL SERVICES BUILDING, TRA653. CAMERA FACING NORTHWEST AS BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR-MTR MECHANICAL SERVICES BUILDING, TRA-653. CAMERA FACING NORTHWEST AS BUILDING WAS NEARLY COMPLETE. INL NEGATIVE NO. 57-3653. K. Mansfield, Photographer, 7/22/1957 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  5. Advanced building energy management system demonstration for Department of Defense buildings.

    PubMed

    O'Neill, Zheng; Bailey, Trevor; Dong, Bing; Shashanka, Madhusudana; Luo, Dong

    2013-08-01

    This paper presents an advanced building energy management system (aBEMS) that employs advanced methods of whole-building performance monitoring combined with statistical methods of learning and data analysis to enable identification of both gradual and discrete performance erosion and faults. This system assimilated data collected from multiple sources, including blueprints, reduced-order models (ROM) and measurements, and employed advanced statistical learning algorithms to identify patterns of anomalies. The results were presented graphically in a manner understandable to facilities managers. A demonstration of aBEMS was conducted in buildings at Naval Station Great Lakes. The facility building management systems were extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of more efficient operation strategies. At Naval Station Great Lakes, greater than 20% savings were demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy-efficient operation strategies. The paper concludes with recommendations for widespread aBEMS success. © 2013 New York Academy of Sciences.

  6. 7. SHEET 1, CONTROL HOUSE FOR DRY DOCK. United Engineering ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. SHEET 1, CONTROL HOUSE FOR DRY DOCK. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Plans, elevations, sections, details. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. 1 of 2 sheets, Plan no. 10,507. Various scales. January 4, 1943, last revised 1/28/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Control House for Dry Dock, 2900 Main Street, Alameda, Alameda County, CA

  7. Building Toxic Metal Characterization and Decontamination Report: Area 6, Building 914

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Industrial Hygiene

    2011-08-15

    The purpose of this report is to outline the toxic metal characterization and decontamination efforts in Area 6, Building 914. This includes the initial building inspection, the hotspot sampling, results/findings, building cleanup, and the verification sampling. Building 914 is a steel light frame building that was constructed in 1992. It is about 16,454 square feet, and five employees are assigned to this building. According to the building's floor plan blueprints, it could be inferred that this building was once a Wiremen/Lineman shop. In 2002-2004, the National Nuclear Security Administration Nevada Site Office embarked on a broad characterization of beryllium (Be)more » surface concentrations throughout the North Las Vegas Facility, the Nevada National Security Site (NNSS), and ancillary facilities like the Special Technologies Laboratory, Remote Sensing Laboratory, etc. Building 914 was part of this characterization. The results of the 2002 study illustrated that the metal housekeeping limits were within acceptable limits and from a Be standpoint, the building was determined to be fit for occupancy. On March 2, 2011, based on a request from Building 914 users, National Security Technologies, LLC (NSTec) Industrial Hygiene (IH) collected bulk samples from the southwest corner of Building 914 at heights above 6 feet where black dust had been noticed on this particular wall. IH conducted surface swipe sampling of the area and analyzed the samples for toxic metals, namely, beryllium (Be), cadmium (Cd), chromium (Cr), lead (Pb), and manganese (Mn). The sample results indicated values two to four times above the housekeeping threshold for Be, Cd, Cr, Pb, and Mn. Subsequently, the facility was closed and posted; the necessary personnel were notified; and controls were instituted for ingress and egress of the building. On March 17, 2011, IH performed an extensive sampling event involving the entire warehouse in accordance with NSTec Organization Procedure OP-P250

  8. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 1: Executive summary

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.

  9. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.

  10. 75 FR 78937 - Airworthiness Directives; Honeywell International LTS101 Series Turboshaft Engines and LTP101...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Management Facility, U.S. Department of Transportation, 1200 New Jersey Avenue, SE., West Building Ground..., Aerospace Engineer, Los Angeles Aircraft Certification Office, FAA, Transport Airplane Directorate, 3960... an association, business, labor union, etc.). You may review the DOT's complete Privacy Act Statement...

  11. SLS Engine Section Test Article Moved for Stacking at Michoud

    NASA Image and Video Library

    2017-04-25

    Stacking is underway for the Space Launch System core stage engine section structural qualification test article at NASA's Michoud Assembly Facility in New Orleans. The rocket's engine section is the bottom of the core stage and houses the four RS-25 engines. The engine section test article was moved to Michoud's Cell A in Building 110 for vertical stacking with hardware that simulates the rocket's liquid hydrogen tank, which is the fuel tank that joins to the engine section. Once stacked, the entire test article will load onto the barge Pegasus and ship to NASA's Marshall Space Flight Center in Huntsville, Alabama. There, it will be subjected to millions of pounds of force during testing to ensure the hardware can withstand the incredible stresses of launch.

  12. 20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. SECONDARY WASTE/ETF (EFFLUENT TREATMENT FACILITY) PRELIMINARY PRE-CONCEPTUAL ENGINEERING STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY TH; GEHNER PD; STEGEN GARY

    2009-12-28

    This pre-conceptual engineering study is intended to assist in supporting the critical decision (CD) 0 milestone by providing a basis for the justification of mission need (JMN) for the handling and disposal of liquid effluents. The ETF baseline strategy, to accommodate (WTP) requirements, calls for a solidification treatment unit (STU) to be added to the ETF to provide the needed additional processing capability. This STU is to process the ETF evaporator concentrate into a cement-based waste form. The cementitious waste will be cast into blocks for curing, storage, and disposal. Tis pre-conceptual engineering study explores this baseline strategy, in additionmore » to other potential alternatives, for meeting the ETF future mission needs. Within each reviewed case study, a technical and facility description is outlined, along with a preliminary cost analysis and the associated risks and benefits.« less

  14. Estimating for building and civil engineering works. Eighth edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geddes, S.; Chrystal-Smith, G.; Jolly, P.

    1986-01-01

    This new edition of Spence Geddes classic work has been revised and updated to take into account changes since the seventh edition of 1981. It remains a standard reference work which combines a step-by-step guide to the preparation of estimates from tendering stage with a fully representative selection of labour and material constants and worked examples of actual calculations. The estimating information is tabulated as hour constants which are unaffected by fluctuations of labour and plant hire costs. Two new sections have been included. In previous editions dayworks received a few brief notes only, but as so much daywork ismore » carried out on both large and small contracts, and as it can frequently give rise to misunderstanding, a fuller explanation was thought helpful. Landscaping, once the province of the gardener is now very often an integral part of building and civil engineering contracts and a new chapter has therefore been added. With these additions and the careful updating, the book is an indispensable source of reference for the estimator and a valuable source of information for architects, engineers and surveyors.« less

  15. Building Awards | NREL

    Science.gov Websites

    Mountain campus is designed to meet the Gold or Platinum standards of the U.S. Green Building Council's Research Facility. South Site Entrance Building South Site Entrance Building 2013 U.S. Green Buildings Building Awards Building Awards NREL's high-performance buildings are sustainability models for the

  16. An engine awaits processing in the new engine shop at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    A new Block 2A engine awaits processing in the low bay of the Space Shuttle Main Engine Processing Facility (SSMEPF). Officially opened on July 6, the new facility replaces the Shuttle Main Engine Shop. The SSMEPF is an addition to the existing Orbiter Processing Facility Bay 3. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998.

  17. SPERTI Reactor Pit Building (PER605) under construction. Poured concrete foundation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Reactor Pit Building (PER-605) under construction. Poured concrete foundation will enclosure a "Pit" into which the reactor vessel will be placed. Steel framework has been erected. To left of view is instrument cell (PER-606), constructed of concrete block. Photographer: R.G. Larsen. Date: April 22, 1955. INEEL negative no. 55-1000 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  18. PBF Reactor Building (PER620). Camera faces south along west wall. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces south along west wall. Gap between native lava rock and concrete basement walls is being backfilled and compacted. Wire mesh protects workers from falling rock. Note penetrations for piping that will carry secondary coolant water to Cooling Tower. Photographer: Holmes. Date: June 15, 1967. INEEL negative no. 67-3665 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  19. PBF Cooling Tower and it Auxiliary Building (PER624) to left ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Cooling Tower and it Auxiliary Building (PER-624) to left of tower. Camera facing west and the east louvered face of the tower. Details include secondary coolant water riser piping and flow control valves (butterfly valves) to distribute water evenly to all sections of tower. Photographer: Holmes. Date: May, 20, 1970. INEEL negative no. 70-2322 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. PBF Reactor Building (PER620). After lowering reactor vessel onto blocks, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). After lowering reactor vessel onto blocks, it is rolled on logs into PBF. Metal framework under vessel is handling device. Various penetrations in reactor bottom were for instrumentation, poison injection, drains. Large one, below center "manhole" was for primary coolant. Photographer: Larry Page. Date: February 13, 1970. INEEL negative no. 70-736 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  1. 26. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1945 ZULU TIME, 26 OCTOBER, 1999. "SPACE TRACK BOARD" DATA SHOWING ITEMS #16609 MIR (RUSSIA) AND #25544 ISS (INTERNATIONAL SPACE STATION) BEING TRACKED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. Facilities | Bioenergy | NREL

    Science.gov Websites

    Facilities Facilities At NREL's state-of-the-art bioenergy research facilities, researchers design options. Photo of interior of industrial, two-story building with high-bay, piping, and large processing

  3. SP-100 ground engineering system test site description and progress update

    NASA Astrophysics Data System (ADS)

    Baxter, William F.; Burchell, Gail P.; Fitzgibbon, Davis G.; Swita, Walter R.

    1991-01-01

    The SP-100 Ground Engineering System Test Site will provide the facilities for the testing of an SP-100 reactor, which is technically prototypic of the generic design for producing 100 kilowatts of electricity. This effort is part of the program to develop a compact, space-based power system capable of producing several hundred kilowatts of electrical power. The test site is located on the U.S. Department of Energy's Hanford Site near Richland, Washington. The site is minimizing capital equipment costs by utilizing existing facilities and equipment to the maximum extent possible. The test cell is located in a decommissioned reactor containment building, and the secondary sodium cooling loop will use equipment from the Fast Flux Test Facility plant which has never been put into service. Modifications to the facility and special equipment are needed to accommodate the testing of the SP-100 reactor. Definitive design of the Ground Engineering System Test Site facility modifications and systems is in progress. The design of the test facility and the testing equipment will comply with the regulations and specifications of the U.S. Department of Energy and the State of Washington.

  4. 29. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) AT SYSTEM LAYOUT GRID 17. GENERAL OBLIQUE VIEW OF "A" FACE INTERIOR SHOWING RADAR EMITTER/ANTENNA INTERFACE ELECTRONICS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. Environmental Assessment: Proposed Consolidated Transportation Facility, Hill Air Force Base, Utah

    DTIC Science & Technology

    2011-02-01

    environment, establishing a resource baseline against which the effects of the various alternatives can be evaluated. It presents relevant facilities and...regulated include the following waste streams. • Used spray cans (less than one ton per year) are collected. These cans are typically empty or mostly...Civil Engineer Organizations, 75 CEG and 75 CES T 84056 5713 Lahm Lane, Building 593N, Hill AFB U Steven Weed, MILCON Project Programmer, (801

  6. ETR HEAT EXCHANGER BUILDING, TRA644. DETAIL OF SOUTH SIDE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR HEAT EXCHANGER BUILDING, TRA-644. DETAIL OF SOUTH SIDE BUILDING INSET. DEMINERALIZER WING AT RIGHT. CAMERA FACING NORTH. INL NEGATIVE NO. HD46-36-2. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  7. 21. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT DISC STORAGE SYSTEMS A AND B (A OR B ARE REDUNDANT SYSTEMS), ONE MAINFRAME COMPUTER ON LINE, ONE ON STANDBY WITH STORAGE TAPE, ONE ON STANDBY WITHOUT TAPE INSTALLED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. 58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V-2 ASSEMBLY BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  9. 56. V2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. V-2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH MILL BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  10. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    NASA Astrophysics Data System (ADS)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  11. Building 1100--NASA

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Building 1100 is the NASA administrative building. Services located in this building include two banks, a post office, barber shop, cafeteria, snack bar, travel agency, dry cleaners, the NASA Exchange retail store and medical facilities for employees.

  12. U.S.– India Joint Center for Building Energy Research and Development (CBERD) Caring for the Energy Health of Healthcare Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Reshma; Mathew, Paul; Granderson, Jessica

    The U.S.-India Joint Center for Building Energy Research & Development (CBERD), created through the Partnership to Accelerate Clean Energy (PACE) agreement between the United States and India, is a research and development (R&D) center with over 30 institutional and industry partners from both nations. This five-year presidential initiative is jointly funded by the U.S. Department of Energy and the Government of India. CBERD aims to build upon a foundation of collaborative knowledge, tools, and technologies, and human capabilities that will increase development of high-performance buildings. To reach this goal, the R&D focuses on energy use reduction throughout the entire lifemore » cycle of buildings—i.e., design, construction, and operations. During the operations phase of buildings, even with best-practice energy-efficient design, actual energy use can be much higher than the design intent. Every day, much of the energy consumed by buildings serves no purpose (Roth et al. 2005). Building energy information systems (EIS) are commercially available systems that building owners and facility managers use to assess their building operations, measure, visualize, analyze, and report energy cost and consumption. Energy information systems can enable significant energy savings by tracking energy use, identifying consumption patterns, and benchmarking performance against similar buildings, thereby identifying improvement opportunities. The CBERD team has identified potential energy savings of approximately 2 quads of primary energy in the United States, while industry building energy audits in India have indicated potential energy savings of up to 30 percent in commercial buildings such as offices. Additionally, the CBERD team has identified healthcare facilities (e.g., hospitals, clinics), hotels, and offices as the three of the highest-growth sectors in India that have significant energy consumption, and that would benefit the most from implementation of EIS.« less

  13. Software-engineering challenges of building and deploying reusable problem solvers.

    PubMed

    O'Connor, Martin J; Nyulas, Csongor; Tu, Samson; Buckeridge, David L; Okhmatovskaia, Anna; Musen, Mark A

    2009-11-01

    Problem solving methods (PSMs) are software components that represent and encode reusable algorithms. They can be combined with representations of domain knowledge to produce intelligent application systems. A goal of research on PSMs is to provide principled methods and tools for composing and reusing algorithms in knowledge-based systems. The ultimate objective is to produce libraries of methods that can be easily adapted for use in these systems. Despite the intuitive appeal of PSMs as conceptual building blocks, in practice, these goals are largely unmet. There are no widely available tools for building applications using PSMs and no public libraries of PSMs available for reuse. This paper analyzes some of the reasons for the lack of widespread adoptions of PSM techniques and illustrate our analysis by describing our experiences developing a complex, high-throughput software system based on PSM principles. We conclude that many fundamental principles in PSM research are useful for building knowledge-based systems. In particular, the task-method decomposition process, which provides a means for structuring knowledge-based tasks, is a powerful abstraction for building systems of analytic methods. However, despite the power of PSMs in the conceptual modeling of knowledge-based systems, software engineering challenges have been seriously underestimated. The complexity of integrating control knowledge modeled by developers using PSMs with the domain knowledge that they model using ontologies creates a barrier to widespread use of PSM-based systems. Nevertheless, the surge of recent interest in ontologies has led to the production of comprehensive domain ontologies and of robust ontology-authoring tools. These developments present new opportunities to leverage the PSM approach.

  14. Software-engineering challenges of building and deploying reusable problem solvers

    PubMed Central

    O’CONNOR, MARTIN J.; NYULAS, CSONGOR; TU, SAMSON; BUCKERIDGE, DAVID L.; OKHMATOVSKAIA, ANNA; MUSEN, MARK A.

    2012-01-01

    Problem solving methods (PSMs) are software components that represent and encode reusable algorithms. They can be combined with representations of domain knowledge to produce intelligent application systems. A goal of research on PSMs is to provide principled methods and tools for composing and reusing algorithms in knowledge-based systems. The ultimate objective is to produce libraries of methods that can be easily adapted for use in these systems. Despite the intuitive appeal of PSMs as conceptual building blocks, in practice, these goals are largely unmet. There are no widely available tools for building applications using PSMs and no public libraries of PSMs available for reuse. This paper analyzes some of the reasons for the lack of widespread adoptions of PSM techniques and illustrate our analysis by describing our experiences developing a complex, high-throughput software system based on PSM principles. We conclude that many fundamental principles in PSM research are useful for building knowledge-based systems. In particular, the task–method decomposition process, which provides a means for structuring knowledge-based tasks, is a powerful abstraction for building systems of analytic methods. However, despite the power of PSMs in the conceptual modeling of knowledge-based systems, software engineering challenges have been seriously underestimated. The complexity of integrating control knowledge modeled by developers using PSMs with the domain knowledge that they model using ontologies creates a barrier to widespread use of PSM-based systems. Nevertheless, the surge of recent interest in ontologies has led to the production of comprehensive domain ontologies and of robust ontology-authoring tools. These developments present new opportunities to leverage the PSM approach. PMID:23565031

  15. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  16. Preventing Airborne Disease Transmission: Review of Methods for Ventilation Design in Health Care Facilities

    PubMed Central

    Aliabadi, Amir A.; Rogak, Steven N.; Bartlett, Karen H.; Green, Sheldon I.

    2011-01-01

    Health care facility ventilation design greatly affects disease transmission by aerosols. The desire to control infection in hospitals and at the same time to reduce their carbon footprint motivates the use of unconventional solutions for building design and associated control measures. This paper considers indoor sources and types of infectious aerosols, and pathogen viability and infectivity behaviors in response to environmental conditions. Aerosol dispersion, heat and mass transfer, deposition in the respiratory tract, and infection mechanisms are discussed, with an emphasis on experimental and modeling approaches. Key building design parameters are described that include types of ventilation systems (mixing, displacement, natural and hybrid), air exchange rate, temperature and relative humidity, air flow distribution structure, occupancy, engineered disinfection of air (filtration and UV radiation), and architectural programming (source and activity management) for health care facilities. The paper describes major findings and suggests future research needs in methods for ventilation design of health care facilities to prevent airborne infection risk. PMID:22162813

  17. Preventing airborne disease transmission: review of methods for ventilation design in health care facilities.

    PubMed

    Aliabadi, Amir A; Rogak, Steven N; Bartlett, Karen H; Green, Sheldon I

    2011-01-01

    Health care facility ventilation design greatly affects disease transmission by aerosols. The desire to control infection in hospitals and at the same time to reduce their carbon footprint motivates the use of unconventional solutions for building design and associated control measures. This paper considers indoor sources and types of infectious aerosols, and pathogen viability and infectivity behaviors in response to environmental conditions. Aerosol dispersion, heat and mass transfer, deposition in the respiratory tract, and infection mechanisms are discussed, with an emphasis on experimental and modeling approaches. Key building design parameters are described that include types of ventilation systems (mixing, displacement, natural and hybrid), air exchange rate, temperature and relative humidity, air flow distribution structure, occupancy, engineered disinfection of air (filtration and UV radiation), and architectural programming (source and activity management) for health care facilities. The paper describes major findings and suggests future research needs in methods for ventilation design of health care facilities to prevent airborne infection risk.

  18. 1. West elevations of barrier (Building 4216/E17) and Monitor Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West elevations of barrier (Building 4216/E-17) and Monitor Building (4203/E-4). Barrier is built of wood infilled with earth, intended to protect Monitor Building from flying debris should anything at Test Stand 'A' explode. Building 4203/E-4 is built of reinforced concrete; equipment on top of it is cooling tower for refrigeration equipment in Test Stand 'A' machinery room. Electrical utility poles are typical at the facility, and carry 4,800 volts 3-phase alternating current. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Control Center, Edwards Air Force Base, Boron, Kern County, CA

  19. COMPRESSOR BUILDING, TRA626. ELEVATIONS. WINDOWS. WALL SECTIONS. PUMICE BLOCK BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    COMPRESSOR BUILDING, TRA-626. ELEVATIONS. WINDOWS. WALL SECTIONS. PUMICE BLOCK BUILDING HOUSED COMPRESSORS FOR AIRCRAFT NUCLEAR PROPULSION EXPERIMENTS. MTR-626-IDO-2S, 3/1952. INL INDEX NO. 531-0626-00-396-110535, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  20. Engine Research Building’s Central Control Room

    NASA Image and Video Library

    1948-07-21

    Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.