Castella, Francisco
2005-02-01
The way forward for hospital services and facilities management is examined by Francisco Castella, Doctor of Engineering and a member of the International Federation of Hospital Engineering Council. In this article, which is based on a paper presented at the 18th IFHE Congress, he draws on his experience as facility manager and director of general services in the Teaching Hospital of Badalona, Spain, and on knowledge gained through attending IFHE Congresses - representing the Spanish Hospital Engineering Association.
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
DESCRIPTION OF RISK REDUCTION ENGINEERING LABORATORY TEST AND EVALUATION FACILITIES
An onsite team of multidisciplined engineers and scientists conduct research and provide technical services in the areas of testing, design, and field implementation for both solid and hazardous waste management. Engineering services focus on the design and implementation of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified... Facility Design Report and Fabrication and Installation Report. (1) If the CVA or project engineer finds...
US Naval Facilities Engineering Service Center Environmental Program on Climate Change
2008-09-01
of environmental issues related to climate change . There is a growing recognition that the Navy will need to perform its national security mission in... climate change -related technology work at the Naval Facilities Engineering Service Center (NAVFAC ESC) in Port Hueneme, California. NAVFAC ESC...categorized technologies that can be applied to climate change as mitigation, adaptation, and intervention. An essential element of the Navy’s response to
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the top level of the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned
2010-07-01
Area 1-30A explosive facility and provide consultation/support during the review process for each of the site plans. • Applied Engineering Services...provided consultation/support during the siting review process. • Applied Engineering Services (AES) Inc. performed a detailed structural, blast, thermal... Applied Engineering Services (AES) Inc. structural, blast, thermal and fragment hazard analysis to determine the appropriate siting values based on
NASA Technical Reports Server (NTRS)
1981-01-01
The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating
NASA Astrophysics Data System (ADS)
1981-09-01
The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating
40 CFR 90.1207 - Entry and access.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the following places: (1) Any facility where engines undergo or are undergoing aging, maintenance, repair, preparation for aging, selection for aging or emission testing. (2) Any facility where records or... (b) and also to inspect and make copies of records related to engine aging (service accumulation) and...
40 CFR 90.1207 - Entry and access.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the following places: (1) Any facility where engines undergo or are undergoing aging, maintenance, repair, preparation for aging, selection for aging or emission testing. (2) Any facility where records or... (b) and also to inspect and make copies of records related to engine aging (service accumulation) and...
40 CFR 90.1207 - Entry and access.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the following places: (1) Any facility where engines undergo or are undergoing aging, maintenance, repair, preparation for aging, selection for aging or emission testing. (2) Any facility where records or... (b) and also to inspect and make copies of records related to engine aging (service accumulation) and...
40 CFR 90.1207 - Entry and access.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the following places: (1) Any facility where engines undergo or are undergoing aging, maintenance, repair, preparation for aging, selection for aging or emission testing. (2) Any facility where records or... (b) and also to inspect and make copies of records related to engine aging (service accumulation) and...
40 CFR 90.1207 - Entry and access.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the following places: (1) Any facility where engines undergo or are undergoing aging, maintenance, repair, preparation for aging, selection for aging or emission testing. (2) Any facility where records or... (b) and also to inspect and make copies of records related to engine aging (service accumulation) and...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 811.107 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND... requests for proposals for technical medical and other technical equipment and devices issued by a field facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not...
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. To the left are several pneumatic panels. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
21. Photocopy of engineering drawing. COMPLEX 17A AND B: SERVICE ...
21. Photocopy of engineering drawing. COMPLEX 17A AND B: SERVICE STRUCTURE SPACECRAFT AREA-MECHANICAL, ELEVATIONS, SHEET 4, DECEMBER 1965. - Cape Canaveral Air Station, Launch Complex 17, Facility 28417, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
In Situ Wetland Restoration Demonstration
2014-07-01
Program (ESTCP) has funded the Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) and its DoD partners: U.S. Army Public Health ...Command Engineering Service Center [NAVFAC ESC]) and its DoD partners U.S. Army Public Health Command, Naval Facilities Engineering Command Atlantic...made that unacceptable risks to human health or the environment may be present in portions of the Canal Creek system. Innovative technologies
2006-08-01
and on the west by the Banana River, which is an estuarine system. Figure 1-1 shows CCAFS and the surrounding area. CCAFS encompasses approximately...barrier island on which it is located characterizes the visual environment in the vicinity of CCAFS. The Indian and Banana rivers separate the...large expanses of inland waters in the Indian, Banana , and St. John’s rivers and large ENVIRONMENTAL ASSESSMENT-ENGINEERING SERVICES FACILITY AT
19. Photocopy of engineering drawing. COMPLEX 17A AND B: SERVICE ...
19. Photocopy of engineering drawing. COMPLEX 17A AND B: SERVICE STRUCTURE SPACECRAFT AREA A/C-MECHANICAL, ELEVATIONS, SHEET 3, DECEMBER 1965. - Cape Canaveral Air Station, Launch Complex 17, Facility 28416, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
Evaluating technology service options.
Blumberg, D F
1997-05-01
Four service and support options are available to healthcare organizations for maintaining their growth arsenals of medical and information technology. These options include maintaining and servicing all equipment using a facility-based biomedical engineering and MIS service department; using a combination of facility-based service and subcontracted service; expanding facility-based biomedical and MIS service departments to provide service to other healthcare organizations to achieve economies of scale; and outsourcing all maintenance, repair, and technical support services. Independent service companies and original equipment manufacturers (OEMs) are offering healthcare organizations a wider array of service and support capabilities than ever before. However, some health systems have successfully developed their own independent service organizations to take care of their own--and other healthcare organizations'--service and support needs.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... U.S. Postal Service to Naval Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS... project Web site ( www.MITT-EIS.com ). All comments, oral or written, submitted during the public review... Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS Project Manager, 258 Makalapa Drive, Suite...
7 CFR 1724.32 - Inspection and certification of work order construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...
7 CFR 1724.32 - Inspection and certification of work order construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...
Code of Federal Regulations, 2014 CFR
2014-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2011 CFR
2011-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
30 CFR 1220.011 - Schedule of allowable direct and allocable joint costs and credits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... engineering design problems related to equipment or facilities required for NPSL operations. (4) The cost of any contract service related to research and development is specifically excluded, as are contract services calling for feasibility studies not directly related to specific engineering design problems or...
Financial Management Regulation. Volume 4. Accounting Policy and Procedures. Department of Defense.
1995-01-01
Port Royal Road, Springfield, VA 22161; telephone (703) 487-4650. __ Accesion For NTIS CRA&I WI .. TAB Unannounced Q Justific tior1 By Disiribotion...for environmental response actions 2854 Restoration or replacement of damaged or destroyed facilities 4540 Architectural and engineering services 7212...Employment of outside architects and engineers Architectural and engineering services 21. Public Law 99-500, "Making continuing appropriations
Code of Federal Regulations, 2010 CFR
2010-07-01
... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified Verification Agent... Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or floating facility...
7 CFR 1724.21 - Architectural services contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES... RUS financed electric system facilities. (a) RUS Form 220, Architectural Services Contract, must be used by electric borrowers when obtaining architectural services. (b) The borrower shall ensure that...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or facilities); (3) Routine legal, actuarial, auditing, and accounting services; and (4) Training services. [55...
Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, Steven
2003-01-01
Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less
Loading Rates and Impacts of Substrate Delivery for Enhanced Anaerobic Bioremediation
2010-01-01
Naval Facilities Engineering Command/Engineering Services Center NDMA N-nitrosodimethylamine ORP oxidation reduction potential PCE...nitrosodimethylamine ( NDMA ) is used with propellants and is a carcinogen and emerging groundwater contaminant at a number of DoD and DOE facilities. NDMA may...demonstrating an alternative degradation process for NDMA using injection (biosparging) of propane gas and oxygen to stimulate degradation by 23
32 CFR 644.27 - Authority to issue Real Estate Directives.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Department of the Army policies, excepting the acquisition by lease of industrial and commercial facilities..., Directorate of Engineering and Services, HQ, USAF. Major Air Commands and Air Force Regional Civil Engineers...
NASA Technical Reports Server (NTRS)
Moon, James
2004-01-01
My name is James Moon and I am a senor at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time sohare applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified...
1988-08-01
Waterways Experiment Station, Corps of Engineers PO Box 631, Vicksburg, Mississippi 39180-0631 DTI ~;~c~v ~ jAUG 291988 : H Ke August 1988 Final Report...PART I: INTRODUCTION ................................................ 3 Background ........................................................ 3...Information Service, 5285 Port Royal Road, Springfield, VA. 22161. 2 ANNUAL DATA SUMMARY FOR 1986 CERC FIELD RESEARCH FACILITY PART I: INTRODUCTION
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 285.713 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
7 CFR 1724.20 - Borrowers' requirements-architectural services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN.... The provisions of this section apply to all borrower electric system facilities regardless of the... under subpart E of this part, and, as applicable, those duties assigned to the “engineer” for...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
48 CFR 836.602-4 - Selection authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-4 Selection authority. The Director, Office of Construction and Facilities Management (for Central Office contracts), the Director, Office of Construction Management (for National Cemetery Administration contracts...
Code of Federal Regulations, 2010 CFR
2010-04-01
... facilities for living, sleeping, cooking and eating. Equipment includes materials, appliances, devices... Engineering and Architecture Examiners and who is engaged in the professional practice of rendering service or... special knowledge of the mathematical, physical and engineering sciences in such professional or creative...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false Purpose. 9.1 Section 9.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... and study facilities to academic scientists, engineers, and qualified students. ...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 1 2014-10-01 2014-10-01 false Purpose. 9.1 Section 9.1 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... and study facilities to academic scientists, engineers, and qualified students. ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 1 2012-10-01 2012-10-01 false Purpose. 9.1 Section 9.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... and study facilities to academic scientists, engineers, and qualified students. ...
Software Manages Documentation in a Large Test Facility
NASA Technical Reports Server (NTRS)
Gurneck, Joseph M.
2001-01-01
The 3MCS computer program assists and instrumentation engineer in performing the 3 essential functions of design, documentation, and configuration management of measurement and control systems in a large test facility. Services provided by 3MCS are acceptance of input from multiple engineers and technicians working at multiple locations;standardization of drawings;automated cross-referencing; identification of errors;listing of components and resources; downloading of test settings; and provision of information to customers.
Welding Emissions in Shipbuilding and Repair (Briefing Charts)
2009-09-03
not just about Hexavalent Chromium • http://www.weldinglawsuits.com/ 5 Naval Facilities Engineering Command/ Engineering Service Center Driving...Regulations ( the Dry Stuff) • OSHA 1910.1026 – Hexavalent Chromium Regulation • OSHA 1910.1000 – Limits for Air Contaminants – e.g. Manganese, Nickel...gas – GTAW –uses shield gas, but low emissions –aka TIG – SAW – lowest rate, solid wire weld covered with flux material 7 Naval Facilities
Acquisition Quality Improvement Within Naval Facilities Engineering Command Southwest
2015-06-01
Act BMS Business Management System BPA Blanket Purchase Agreement COR Contracting Officer Representative CS Contract Specialist DASN...Services (MOPAS) missing in two service contract files. (2) Blanket Purchase Agreement ( BPA ) procedures were not followed. (3) Business
Code of Federal Regulations, 2012 CFR
2012-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... of the academic scientist, or engineer, or student, with the prospect of fruitful interchange of ideas and information between Department personnel and the academic scientist, or engineer, or student...
Code of Federal Regulations, 2011 CFR
2011-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... of the academic scientist, or engineer, or student, with the prospect of fruitful interchange of ideas and information between Department personnel and the academic scientist, or engineer, or student...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... of the academic scientist, or engineer, or student, with the prospect of fruitful interchange of ideas and information between Department personnel and the academic scientist, or engineer, or student...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Department of Health and Human Services GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... of the academic scientist, or engineer, or student, with the prospect of fruitful interchange of ideas and information between Department personnel and the academic scientist, or engineer, or student...
Code of Federal Regulations, 2013 CFR
2013-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC... of the academic scientist, or engineer, or student, with the prospect of fruitful interchange of ideas and information between Department personnel and the academic scientist, or engineer, or student...
NASA Technical Reports Server (NTRS)
Mcallister, J. G.
1984-01-01
Space based servicing of an orbit transfer vehicle (OTV) was previously outlined in sufficient detail to arrive at OTV and support system servicing requirements. Needed space station facilities and their functional requirements were identified. The impact of logistics and space serviceable design on the OTV design is detailed herein. RL10 derivative rocket engine inspection task times are enumerated.
NASA Technical Reports Server (NTRS)
Phillips, Veronica J.
2017-01-01
The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
2010-01-01
attenuation MSDS material safety data sheet NAVFAC ESC Naval Facilities Engineering Command/Engineering Services Center NDMA N-nitrosodimethylamine...compounds (ER-1607, ER-200425, and ER- 201028). N-nitrosodimethylamine ( NDMA ) is used with propellants and is a carcinogen and emerging groundwater...contaminant at a number of DoD and DOE facilities. NDMA may be amendable to enhanced in situ bioremediation (Szecsody et al., 2009; Hatzinger et al., 2008
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1957-01-01
The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Wastemore » Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.« less
2000-04-14
Center Director Roy Bridges (left) dons protective apron, gloves and face shield before the "ribbon-breaking" to open the new Cryogenic Testbed Facility. Part of the normal ceremonial ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
2000-04-14
Center Director Roy Bridges (left), wearing protective apron, gloves and face shield, watches as liquid nitrogen is poured into a container to freeze the plastic tubing for a special "ribbon-breaking" to open the new Cryogenic Testbed Facility. Bridges hit the section of tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
2000-04-14
A shower of frozen plastic signifies the successful breaking of the ceremonial "ribbon" at the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
2000-04-14
Center Director Roy Bridges (center) is congratulated for the successful breaking of the ceremonial "ribbon" and the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
76 FR 21336 - Procurement List; Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... Research, Development, & Engineering Command, Natick, MA. Self-stick, Repositionable Flags NSN: 7510-01-315..., NAVFAC ENGINEERING COMMAND HAWAII, PEARL HARBOR, HI. Service Type/Location: Facility Maintenance, US... ADMINISTRATION, NEW YORK, NY. Slacks, Woman's, Navy--Tropical Blue NSN: 8410-01-377-9373. NPAs: Knox County...
22. Photocopy of engineering drawing. MODIFICATION TO LAUNCH COMPLEX 17 ...
22. Photocopy of engineering drawing. MODIFICATION TO LAUNCH COMPLEX 17 MOBILE SERVICE TOWER 'A'-MECHANICAL, PROPULSION DRIVE TRUCKS AND KEY PLAN, MARCH 1967. - Cape Canaveral Air Station, Launch Complex 17, Facility 28416, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
78 FR 67180 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... Navy, Asset Management Division, Naval Facilities Engineering Command, Washington Navy Yard, 1330...: Landholding Agency- US Forest Service Disposal Agency- GSA Comments: 53.6 acres; agricultural/research...- GSA Comments: 54.8 acres; agricultural/research; Sec. 106 Nat'l Historic review required to transfer...
WASTE MINIZATION OPPORTUNITY ASSESSMENT: NAVAL UNDERSEA WARFARE ENGINEERING STATION - KEYPORT, WA
This report describes the application of EPA's waste minimization assessment procedures to a torpedo maintenance facility at the Naval Undersea Warfare Engineering Station, Keyport, WA. he assessment focused on the Mark 48 shop and the Mark 46 shop. hese shops service the Mark 48...
STATION BUILDING. United Engineering Company Ltd., Alameda Shipyard, Ship Repair ...
STATION BUILDING. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plan, elevations, sections, details. Austin Willmott Earl, Consulting Engineer, 233 Sansome Street, San Francisco, California. Drawing no. 504. Various scales. January 20, 1945, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, amendments 4 & 5. blueprint - United Engineering Company Shipyard, Electrical Services & Switching Station, 2900 Main Street, Alameda, Alameda County, CA
76 FR 11764 - Notice of Availability of Government-Owned Inventions; Available for Licensing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
.... Patent No. 7,048,854: Apparatus for the removal of heavy metals from acidic wastewater and chemical... inventions cited should be directed to Andrew Drucker, Naval Facilities Engineering Service Center, Code EV12... INFORMATION CONTACT: Andrew Drucker supporting the Head of Technology Transfer Office, Naval Facilities...
NASA Technical Reports Server (NTRS)
Jackson, Dionne
2005-01-01
The NASA Materials Science Laboratory (MSL) provides science and engineering services to NASA and Contractor customers at KSC, including those working for the Space Shuttle. International Space Station. and Launch Services Programs. These services include: (1) Independent/unbiased failure analysis (2) Support to Accident/Mishap Investigation Boards (3) Materials testing and evaluation (4) Materials and Processes (M&P) engineering consultation (5) Metrology (6) Chemical analysis (including ID of unknown materials) (7) Mechanical design and fabrication We provide unique solutions to unusual and urgent problems associated with aerospace flight hardware, ground support equipment and related facilities.
Engineering Documentation and Data Control
NASA Technical Reports Server (NTRS)
Matteson, Michael J.; Bramley, Craig; Ciaruffoli, Veronica
2001-01-01
Mississippi Space Services (MSS) the facility services contractor for NASA's John C. Stennis Space Center (SSC), is utilizing technology to improve engineering documentation and data control. Two identified improvement areas, labor intensive documentation research and outdated drafting standards, were targeted as top priority. MSS selected AutoManager(R) WorkFlow from Cyco software to manage engineering documentation. The software is currently installed on over 150 desctops. The outdated SSC drafting standard was written for pre-CADD drafting methods, in other words, board drafting. Implementation of COTS software solutions to manage engineering documentation and update the drafting standard resulted in significant increases in productivity by reducing the time spent searching for documents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ansley, Shannon Leigh
2002-02-01
The Idaho Nuclear Technology and Engineering Center (INTEC) Service Wastewater Discharge Facility replaces the existing percolation ponds as a disposal facility for the INTEC Service Waste Stream. A preferred alternative for helping decrease water content in the subsurface near INTEC, closure of the existing ponds is required by the INTEC Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for Waste Area Group 3 Operable Unit 3-13 (DOE-ID 1999a). By August 2002, the replacement facility was constructed approximately 2 miles southwest of INTEC, near the Big Lost River channel. Because groundwater beneath the Idaho National Engineering andmore » Environmental Laboratory (INEEL) is protected under Federal and State of Idaho regulations from degradation due to INEEL activities, preoperational data required by U.S. Department of Energy (DOE) Order 5400.1 were collected. These data include preexisting physical, chemical, and biological conditions that could be affected by the discharge; background levels of radioactive and chemical components; pertinent environmental and ecological parameters; and potential pathways for human exposure or environmental impact. This document presents specific data collected in support of DOE Order 5400.1, including: four quarters of groundwater sampling and analysis of chemical and radiological parameters; general facility description; site specific geology, stratigraphy, soils, and hydrology; perched water discussions; and general regulatory requirements. However, in order to avoid duplication of previous information, the reader is directed to other referenced publications for more detailed information. Documents that are not readily available are compiled in this publication as appendices. These documents include well and borehole completion reports, a perched water evaluation letter report, the draft INEEL Wellhead Protection Program Plan, and the Environmental Checklist.« less
26. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS ...
26. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS MODS FOR STRETCHED TANK DELTA LAUNCH COMPLEX 17-A, MOBILE SERVICE TOWER: SOUTH AND EAST ELEVATIONS-MODIFICATIONS, ARCHITECTURAL, APRIL 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28416, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
27. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS ...
27. Photocopy of engineering drawing. NEW WHITE ROOM AND MULTISOLIDS MODS FOR STRETCHED TANK DELTA LAUNCH COMPLEX 17-A, MOBILE SERVICE TOWER: NORTH AND WEST ELEVATIONS-MODIFICATIONS, ARCHITECTURAL, APRIL 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28416, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
7 CFR 1724.53 - Preparation of plans and specifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.53 Preparation of plans and specifications. The provisions of this section apply to all borrower electric system facilities regardless of the source of financing. (a...
2016-02-01
coefficient LCC Lower Canal Creek MeHg methylmercury MNR monitored natural recovery NIEHS National Institute of Environmental Health Services PAC... Health Command, Naval Facilities Engineering Command Atlantic Division (NAVFAC LANT), U.S. Air Force (USAF), Engineer Research and Development Center...Project ER-200835); (3) a PCB-contaminated tidal creek (Bailey Creek) at Fort Eustis in Virginia (National Institute of Environmental Health Services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerber, Richard; Allcock, William; Beggio, Chris
2014-10-17
U.S. Department of Energy (DOE) High Performance Computing (HPC) facilities are on the verge of a paradigm shift in the way they deliver systems and services to science and engineering teams. Research projects are producing a wide variety of data at unprecedented scale and level of complexity, with community-specific services that are part of the data collection and analysis workflow. On June 18-19, 2014 representatives from six DOE HPC centers met in Oakland, CA at the DOE High Performance Operational Review (HPCOR) to discuss how they can best provide facilities and services to enable large-scale data-driven scientific discovery at themore » DOE national laboratories. The report contains findings from that review.« less
Perchlorate Removal, Destruction, and Field Monitoring Demonstration
2006-10-02
ion exchange unit. A pulsation dampener minimized pressure and flow fluctuations in the ion exchange system and a flow totalizer monitored total...instrumentation and controls, piping , electrical services, site work, service facilities, engineering, construction expenses, and other indirect costs were... Piping 113,750 157,500 Electrical services 48,750 67,500 Site work 65,000 90,000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, J.H.; Roy, D.M.; Mann, B.
1995-12-31
This paper describes an integrated approach to developing a predictive computer model for long-term performance of concrete engineered barriers utilized in LLRW and ILRW disposal facilities. The model development concept consists of three major modeling schemes: hydration modeling of the binder phase, pore solution speciation, and transport modeling in the concrete barrier and service environment. Although still in its inception, the model development approach demonstrated that the chemical and physical properties of complex cementitious materials and their interactions with service environments can be described quantitatively. Applying the integrated model development approach to modeling alkali (Na and K) leaching from amore » concrete pad barrier in an above-grade tumulus disposal unit, it is predicted that, in a near-surface land disposal facility where water infiltration through the facility is normally minimal, the alkalis control the pore solution pH of the concrete barriers for much longer than most previous concrete barrier degradation studies assumed. The results also imply that a highly alkaline condition created by the alkali leaching will result in alteration of the soil mineralogy in the vicinity of the disposal facility.« less
Voss in Service module with cycle ergometer
2001-03-23
ISS002-E-5734 (23 March 2001) --- Astronaut James S. Voss, Expedition Two flight engineer, gives his arms and upper body a workout with the bicycle ergometer facility in the Zvezda Service Module aboard the International Space Station (ISS). The image was recorded with a digital still camera.
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2013 CFR
2013-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2014 CFR
2014-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2011 CFR
2011-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
25 CFR 900.110 - What does this subpart cover?
Code of Federal Regulations, 2012 CFR
2012-04-01
... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...
NASA Technical Reports Server (NTRS)
Pachlhofer, Peter M.; Panek, Joseph W.; Dicki, Dennis J.; Piendl, Barry R.; Lizanich, Paul J.; Klann, Gary A.
2006-01-01
The Propulsion Systems Laboratory at the National Aeronautics and Space Administration (NASA) Glenn Research Center is one of the premier U.S. facilities for research on advanced aeropropulsion systems. The facility can simulate a wide range of altitude and Mach number conditions while supplying the aeropropulsion system with all the support services necessary to operate at those conditions. Test data are recorded on a combination of steady-state and highspeed data-acquisition systems. Recently a number of upgrades were made to the facility to meet demanding new requirements for the latest aeropropulsion concepts and to improve operational efficiency. Improvements were made to data-acquisition systems, facility and engine-control systems, test-condition simulation systems, video capture and display capabilities, and personnel training procedures. This paper discusses the facility s capabilities, recent upgrades, and planned future improvements.
EU H2020 SERA: Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe
NASA Astrophysics Data System (ADS)
Giardini, Domenico; Saleh, Kauzar; SERA Consortium, the
2017-04-01
SERA - Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe - is a new infrastructure project awarded in the last Horizon 2020 call for Integrating Activities for Advanced Communities (INFRAIA-01-2016-2017). Building up on precursor projects like NERA, SHARE, NERIES, SERIES, etc., SERA is expected to contribute significantly to the access of data, services and research infrastructures, and to develop innovative solutions in seismology and earthquake engineering, with the overall objective of reducing the exposure to risks associated to natural and anthropogenic earthquakes. For instance, SERA will revise the European Seismic Hazard reference model for input in the current revision of the Eurocode 8 on Seismic Design of Buildings; we also foresee to develop the first comprehensive framework for seismic risk modeling at European scale, and to develop new standards for future experimental observations and instruments for earthquake engineering and seismology. To that aim, SERA is engaging 31 institutions across Europe with leading expertise in the operation of research facilities, monitoring infrastructures, data repositories and experimental facilities in the fields of seismology, anthropogenic hazards and earthquake engineering. SERA comprises 26 activities, including 5 Networking Activities (NA) to improve the availability and access of data through enhanced community coordination and pooling of resources, 6 Joint Research Activities (JRA) aimed at creating new European standards for the optimal use of the data collected by the European infrastructures, Virtual Access (VA) to the 5 main European services for seismology and engineering seismology, and Trans-national Access (TA) to 10 high-class experimental facilities for earthquake engineering and seismology in Europe. In fact, around 50% of the SERA resources will be dedicated to virtual and transnational access. SERA and EPOS (European Platform Observing System, a European Research Infrastructure Consortium for solid Earth services in Europe) will be developed in parallel, giving SERA the capacity to develop building blocks for EPOS in the areas of seismology, anthropogenic hazards and seismic engineering, such as new virtual access, new anthropogenic hazards products, expanded access to waveform data, etc. In addition, services developed and validated in SERA will be produced in a way that is compatible for integration in EPOS. This communication is aimed at informing the scientific community about the objectives and workplan of SERA, starting in spring 2017 for a duration of 3 years.
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) GENERAL Business and Industrial Loan Program Pt. 1980, Subpt. E, App. D Appendix D to Subpart E... designed utilizing accepted engineering practices and are conformed to applicable Federal, State and local... this appendix. (II) Technical Services. (A) The borrower is responsible for selecting engineering...
14 CFR 171.207 - Performance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
....” (Annex 10 to the Convention on International Civil Aviation) except those portions that pertain to... electronic engineering practices for the desired service. The facility must be checked periodically during...
14 CFR 171.207 - Performance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
....” (Annex 10 to the Convention on International Civil Aviation) except those portions that pertain to... electronic engineering practices for the desired service. The facility must be checked periodically during...
Automated Heat-Flux-Calibration Facility
NASA Technical Reports Server (NTRS)
Liebert, Curt H.; Weikle, Donald H.
1989-01-01
Computer control speeds operation of equipment and processing of measurements. New heat-flux-calibration facility developed at Lewis Research Center. Used for fast-transient heat-transfer testing, durability testing, and calibration of heat-flux gauges. Calibrations performed at constant or transient heat fluxes ranging from 1 to 6 MW/m2 and at temperatures ranging from 80 K to melting temperatures of most materials. Facility developed because there is need to build and calibrate very-small heat-flux gauges for Space Shuttle main engine (SSME).Includes lamp head attached to side of service module, an argon-gas-recirculation module, reflector, heat exchanger, and high-speed positioning system. This type of automated heat-flux calibration facility installed in industrial plants for onsite calibration of heat-flux gauges measuring fluxes of heat in advanced gas-turbine and rocket engines.
Services supporting collaborative alignment of engineering networks
NASA Astrophysics Data System (ADS)
Jansson, Kim; Uoti, Mikko; Karvonen, Iris
2015-08-01
Large-scale facilities such as power plants, process factories, ships and communication infrastructures are often engineered and delivered through geographically distributed operations. The competencies required are usually distributed across several contributing organisations. In these complicated projects, it is of key importance that all partners work coherently towards a common goal. VTT and a number of industrial organisations in the marine sector have participated in a national collaborative research programme addressing these needs. The main output of this programme was development of the Innovation and Engineering Maturity Model for Marine-Industry Networks. The recently completed European Union Framework Programme 7 project COIN developed innovative solutions and software services for enterprise collaboration and enterprise interoperability. One area of focus in that work was services for collaborative project management. This article first addresses a number of central underlying research themes and previous research results that have influenced the development work mentioned above. This article presents two approaches for the development of services that support distributed engineering work. Experience from use of the services is analysed, and potential for development is identified. This article concludes with a proposal for consolidation of the two above-mentioned methodologies. This article outlines the characteristics and requirements of future services supporting collaborative alignment of engineering networks.
Rustagi, Alison Silvis; Gimbel, Sarah; Nduati, Ruth; de Fatima Cuembelo, Maria; Wasserheit, Judith N.; Farquhar, Carey; Gloyd, Stephen; Sherr, Kenneth
2016-01-01
BACKGROUND Efficacious interventions to prevent mother-to-child HIV transmission (PMTCT) have not translated well into effective programs. Prior studies of systems engineering applications to PMTCT lacked comparison groups or randomization. METHODS Thirty-six health facilities in Côte d’Ivoire, Kenya, and Mozambique were randomized to usual care or a systems engineering intervention, stratified by country and volume. The intervention guided facility staff to iteratively identify and then rectify barriers to PMTCT implementation. Registry data quantified coverage of HIV testing during first antenatal care visit, antiretrovirals (ARVs) for HIV-positive pregnant women, and screening HIV-exposed infants (HEI) for HIV by 6–8 weeks. We compared the change between baseline (January 2013–January 2014) and post-intervention (January–March 2015) periods using t-tests. All analyses were intent-to-treat. RESULTS ARV coverage increased 3-fold (+13.3 percentage points [95% CI: 0.5, 26.0] in intervention vs. +4.1 [−12.6, 20.7] in control facilities) and HEI screening increased 17-fold (+11.6 [−2.6, 25.7] in intervention vs. +0.7 [−12.9, 14.4] in control facilities). In pre-specified sub-group analyses, ARV coverage increased significantly in Kenya (+20.9 [−3.1, 44.9] in intervention vs. −21.2 [−52.7, 10.4] in controls; p=0.02). HEI screening increased significantly in Mozambique (+23.1 [10.3, 35.8] in intervention vs. +3.7 [−13.1, 20.6] in controls; p=0.04). HIV testing did not differ significantly between arms. CONCLUSIONS In this first randomized trial of systems engineering to improve PMTCT, we saw substantially larger improvements in ARV coverage and HEI screening in intervention facilities compared to controls, which were significant in pre-specified sub-groups. Systems engineering could strengthen PMTCT service delivery and protect infants from HIV. PMID:27082507
Rustagi, Alison Silvis; Gimbel, Sarah; Nduati, Ruth; Cuembelo, Maria de Fatima; Wasserheit, Judith N; Farquhar, Carey; Gloyd, Stephen; Sherr, Kenneth
2016-07-01
Efficacious interventions to prevent mother-to-child HIV transmission (PMTCT) have not translated well into effective programs. Previous studies of systems engineering applications to PMTCT lacked comparison groups or randomization. Thirty-six health facilities in Côte d'Ivoire, Kenya, and Mozambique were randomized to usual care or a systems engineering intervention, stratified by country and volume. The intervention guided facility staff to iteratively identify and then rectify barriers to PMTCT implementation. Registry data quantified coverage of HIV testing during first antenatal care visit, antiretrovirals (ARVs) for HIV-positive pregnant women, and screening HIV-exposed infants (HEI) for HIV by 6-8 weeks. We compared the change between baseline (January 2013-January 2014) and postintervention (January 2015-March 2015) periods using t-tests. All analyses were intent-to-treat. ARV coverage increased 3-fold [+13.3% points (95% CI: 0.5 to 26.0) in intervention vs. +4.1 (-12.6 to 20.7) in control facilities] and HEI screening increased 17-fold [+11.6 (-2.6 to 25.7) in intervention vs. +0.7 (-12.9 to 14.4) in control facilities]. In prespecified subgroup analyses, ARV coverage increased significantly in Kenya [+20.9 (-3.1 to 44.9) in intervention vs. -21.2 (-52.7 to 10.4) in controls; P = 0.02]. HEI screening increased significantly in Mozambique [+23.1 (10.3 to 35.8) in intervention vs. +3.7 (-13.1 to 20.6) in controls; P = 0.04]. HIV testing did not differ significantly between arms. In this first randomized trial of systems engineering to improve PMTCT, we saw substantially larger improvements in ARV coverage and HEI screening in intervention facilities compared with controls, which were significant in prespecified subgroups. Systems engineering could strengthen PMTCT service delivery and protect infants from HIV.
An assessment of the use of antimisting fuel in turbofan engines
NASA Technical Reports Server (NTRS)
Fiorentino, A. J.; Planell, J. R.
1983-01-01
An evaluation was made on the effects of using antimisting kerosene (AMK) on the performance of the components from the fuel system and the combustor of current in service JT8D aircraft engines. The objectives were to identify if there were any problems associated with using antimisting kerosene and to determine the extent of shearing or degradation required to allow the engine components to achieve satisfactory operation. The program consisted of a literature survey and a test program which evaluated the antimisting kerosene fuel in laboratory and bench component testing, and assessed the performance of the combustor in a high pressure facility and in an altitude relight/cold ignition facility.
[The Engineering and Technical Services Directorate at the Glenn Research Center
NASA Technical Reports Server (NTRS)
Moon, James
2004-01-01
My name is James Moon and I am a senior at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time s o h a r e applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community. In the 7000 Directorate I work directly in the 7611 organization. This organization is known as the Aviation Environments Technical Branch. My mentor is Vincent Satterwhite who is also the Branch Chief of the Aviation Environments Technical Branch. In this branch, I serve as the Assistant program manager of the Engineering Technology Program. The Engineering Technology Program (ETP) is one of three components of the High School L.E.R.C.I.P. This is an Agency-sponsored, eight-week research-based apprenticeship program designed to attract traditionally underrepresented high school students that demonstrate an aptitude for and interest in mathematics, science, engineering, and technology.
NASA Astrophysics Data System (ADS)
1980-07-01
Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)
General layout of reactor and control areas upon advent of ...
General layout of reactor and control areas upon advent of power burst facility (PBF). Shows relationship of PBF to SPERT-I, -II, -III, and -IV. Ebasco Services 1205-PER/PBF-U-102. Date: July 1965. INEEL index no. 761-0100-00-205-123006 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
SP-100 ground engineering system test site description and progress update
NASA Astrophysics Data System (ADS)
Baxter, William F.; Burchell, Gail P.; Fitzgibbon, Davis G.; Swita, Walter R.
1991-01-01
The SP-100 Ground Engineering System Test Site will provide the facilities for the testing of an SP-100 reactor, which is technically prototypic of the generic design for producing 100 kilowatts of electricity. This effort is part of the program to develop a compact, space-based power system capable of producing several hundred kilowatts of electrical power. The test site is located on the U.S. Department of Energy's Hanford Site near Richland, Washington. The site is minimizing capital equipment costs by utilizing existing facilities and equipment to the maximum extent possible. The test cell is located in a decommissioned reactor containment building, and the secondary sodium cooling loop will use equipment from the Fast Flux Test Facility plant which has never been put into service. Modifications to the facility and special equipment are needed to accommodate the testing of the SP-100 reactor. Definitive design of the Ground Engineering System Test Site facility modifications and systems is in progress. The design of the test facility and the testing equipment will comply with the regulations and specifications of the U.S. Department of Energy and the State of Washington.
An Open Source Tool to Test Interoperability
NASA Astrophysics Data System (ADS)
Bermudez, L. E.
2012-12-01
Scientists interact with information at various levels from gathering of the raw observed data to accessing portrayed processed quality control data. Geoinformatics tools help scientist on the acquisition, storage, processing, dissemination and presentation of geospatial information. Most of the interactions occur in a distributed environment between software components that take the role of either client or server. The communication between components includes protocols, encodings of messages and managing of errors. Testing of these communication components is important to guarantee proper implementation of standards. The communication between clients and servers can be adhoc or follow standards. By following standards interoperability between components increase while reducing the time of developing new software. The Open Geospatial Consortium (OGC), not only coordinates the development of standards but also, within the Compliance Testing Program (CITE), provides a testing infrastructure to test clients and servers. The OGC Web-based Test Engine Facility, based on TEAM Engine, allows developers to test Web services and clients for correct implementation of OGC standards. TEAM Engine is a JAVA open source facility, available at Sourceforge that can be run via command line, deployed in a web servlet container or integrated in developer's environment via MAVEN. The TEAM Engine uses the Compliance Test Language (CTL) and TestNG to test HTTP requests, SOAP services and XML instances against Schemas and Schematron based assertions of any type of web service, not only OGC services. For example, the OGC Web Feature Service (WFS) 1.0.0 test has more than 400 test assertions. Some of these assertions includes conformance of HTTP responses, conformance of GML-encoded data; proper values for elements and attributes in the XML; and, correct error responses. This presentation will provide an overview of TEAM Engine, introduction of how to test via the OGC Testing web site and description of performing local tests. It will also provide information about how to participate in the open source code development of TEAM Engine.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... via the U.S. Postal Service to Naval Facilities Engineering Command Southeast, NAS Key West Air... the project Web site ( http://www.keywesteis.com ). All statements, oral or written, submitted during... Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS...
25. Photocopy of engineering drawing. LC17B LONG TANK DELTA UPBUILD: ...
25. Photocopy of engineering drawing. LC-17B LONG TANK DELTA UPBUILD: MOBILE SERVICE TOWER, WEATHER CURTAINS SECTION 1 AND PLANS LEVELS 4 & 4A, 3, 2X, & 1A-ARCHITECTURAL, APRIL 1969. - Cape Canaveral Air Station, Launch Complex 17, Facility 28417, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
NASA Helps Keep the Light Burning for the Saturn Car Company
NASA Technical Reports Server (NTRS)
2003-01-01
The Saturn Electronics & Engineering, Inc. (Saturn) facility in Marks, Miss., that produces lamp assemblies was experiencing itermittent problems with its automotive under the hood lamps. After numerous testing and engineering efforts, technicians could not pin down the root of the problem. So Saturn contacted the NASA Technology Assistance Program (TAP) at Stennis Space Center. The Marks production facility had been experiencing intermittent problems with under the hood lamp assemblies for some time. The failure rate, at 2 percent, was unacceptable. Every effort was made to identify the problem so that corrective action could be put in place. The problem was investigated and researched by Saturn's engineering department. In addition, Saturn brought in several independent testing laboratories. Other measures included examining the switch component suppliers and auditing them for compliance to the design specifications and for surface contaminants. All attempts to identify the factors responsible for the failures were inconclusive. In an effort to get to the root of the problem, and at the recommendation of the Mississippi Department of Economic Development, Saturn contacted the NASA TAP at Stennis. The NASA Materials and Contamination Laboratory, with assistance from the Stennis Prototype Laboratory, conducted a materials evaluation study on the switch components. The laboratory findings showed the failures were caused by a build-up of carbon-based contaminants on the switch components. Saturn Electronics & Engineering, Inc., is a minority-owned provider of contract manufacturing services to a diverse global marketplace. Saturn operates manufacturing facilities globally serving the North American, European, and Asian markets. Saturn's production facility in Marks, Mississippi, produces more than 1,000,000 lamps and switches monthly. "Since the NASA recommendations were implemented, our internal failure rate for intermittency has dropped to less than .02 percent. Most importantly, we restored our high-level of customer satisfaction. Stennis provided an invaluable service to our business," Patrick said. Both NASA and Saturn were pleased with the results form this technical assistance project. The Technology Assistance Program at Stennis makes available to the public NASA technical expertise and access to lab facilities. This project provided both services with a positive outcome.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.
2013-07-01
The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an abovegroundmore » structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)« less
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sorenson, R.J.; Roberts, F.P.; Clark, R.G.
1979-01-19
This document describes the proliferation resistance engineering concepts developed to counter the threat of proliferation of nuclear weapons in an International Fuel Service Center (IFSC). The basic elements of an International Fuel Service Center are described. Possible methods for resisting proliferation such as processing alternatives, close-coupling of facilities, process equipment layout, maintenance philosophy, process control, and process monitoring are discussed. Political and institutional issues in providing proliferation resistance for an International Fuel Service Center are analyzed. The conclusions drawn are (1) use-denial can provide time for international response in the event of a host nation takeover. Passive use-denial is moremore » acceptable than active use-denial, and acceptability of active-denial concepts is highly dependent on sovereignty, energy dependence and economic considerations; (2) multinational presence can enhance proliferation resistance; and (3) use-denial must be nonprejudicial with balanced interests for governments and/or private corporations being served. Comparisons between an IFSC as a national facility, an IFSC with minimum multinational effect, and an IFSC with maximum multinational effect show incremental design costs to be less than 2% of total cost of the baseline non-PRE concept facility. The total equipment acquisition cost increment is estimated to be less than 2% of total baseline facility costs. Personnel costs are estimated to increase by less than 10% due to maximum international presence. 46 figures, 9 tables.« less
Facilities Engineering Services Section
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Science Security, Privacy, Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For
10 CFR 611.205 - Period of award availability.
Code of Federal Regulations, 2011 CFR
2011-01-01
....204 shall apply to— (a) Facilities and equipment placed in service before December 30, 2020; and (b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December...
10 CFR 611.205 - Period of award availability.
Code of Federal Regulations, 2012 CFR
2012-01-01
....204 shall apply to— (a) Facilities and equipment placed in service before December 30, 2020; and (b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December...
10 CFR 611.205 - Period of award availability.
Code of Federal Regulations, 2013 CFR
2013-01-01
....204 shall apply to— (a) Facilities and equipment placed in service before December 30, 2020; and (b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December...
10 CFR 611.205 - Period of award availability.
Code of Federal Regulations, 2014 CFR
2014-01-01
....204 shall apply to— (a) Facilities and equipment placed in service before December 30, 2020; and (b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December...
10 CFR 611.205 - Period of award availability.
Code of Federal Regulations, 2010 CFR
2010-01-01
....204 shall apply to— (a) Facilities and equipment placed in service before December 30, 2020; and (b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December...
Consideration of adding a commercial module to the International Space Station
NASA Astrophysics Data System (ADS)
Friefeld, J.; Fugleberg, D.; Patel, J.; Subbaraman, G.
1999-01-01
The National Aeronautics and Space Administration (NASA) is currently assembling the International Space Station in Low Earth Orbit. One of NASA's program objectives is to encourage space commercialization. Through NASA's Engineering Research and Technology Development program, Boeing is conducting a study to ascertain the feasibility of adding a commercial module to the International Space Station. This module (facility) that can be added, following on-orbit assembly is described. The facility would have the capability to test large, engineering scale payloads in a space environment. It would also have the capability to provide services to co-orbiting space vehicles as well as gathering data for commercial terrestrial applications. The types of industries to be serviced are described as are some of the technical and business considerations that need to be addressed in order to achieve commercial viability.
Great Lakes Steel -- PCI facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eichinger, F.T.; Dake, S.H.; Wagner, E.D.
1997-12-31
This paper discusses the planning, design, and start-up of the 90 tph PCI facility for National Steel`s Great Lakes Steel Division in River Rouge, MI. This project is owned and operated by Edison Energy Services, and was implemented on a fast-track basis by Raytheon Engineers and Constructors, Babcock Material Handling, and Babcock and Wilcox. This paper presents important process issues, basic design criteria, an the challenges of engineering and building a state-of-the-art PCI facility in two existing plants. Pulverized coal is prepared at the River Rouge Power Plant of Detroit Edison, is pneumatically conveyed 6,000 feet to a storage silomore » at Great Lakes Steel, and is injected into three blast furnaces.« less
Innovation in Extraterrestrial Service Systems - A Challenge for Service Science
NASA Technical Reports Server (NTRS)
Bergner, David
2010-01-01
This presentation was prepared at the invitation of Professor Yukio Ohsawa, Department of Systems Innovation, School of Engineering, The University of Tokyo, for delivery at the International Workshop on Innovating Service Systems, sponsored by the Japanese Society of Artificial Intelligence (JSAI) as part of the JSAI Internation Symposium on AI, 2010. It offers several challenges for Service Science and Service Innovation. the goal of the presentation is to stimulate thinking about how service systems viII evolve in the future, as human society advances from its terrestrial base toward a permanent presence in space. First we will consider the complexity of the International Space Station (ISS) as it is today, with particular emphasis of its research facilities, and focus on a current challenge - to maximize the utilization of ISS research facilities for the benefit of society. After briefly reviewing the basic principles of Service Science, we will discuss the potential application of Service Innovation methodology to this challenge. Then we viII consider how game-changing technologies - in particular Synthetic Biology - could accelerate the pace of sociocultural evolution and consequently, the progression of human society into space. We will use this provocative vision to advance thinking about how the emerging field of Service Science, Management, and Engineering (SSME) might help us anticipate and better handle the challenges of this inevitable evolutionary process.
TEST REACTOR AREA PLOT PLAN CA. 1968. MTR AND ETR ...
TEST REACTOR AREA PLOT PLAN CA. 1968. MTR AND ETR AREAS SOUTH OF PERCH AVENUE. "COLD" SERVICES NORTH OF PERCH. ADVANCED TEST REACTOR IN NEW SECTION WEST OF COLD SERVICES SECTION. NEW PERIMETER FENCE ENCLOSES BETA RAY SPECTROMETER, TRA-669, AN ATR SUPPORT FACILITY, AND ATR STACK. UTM LOCATORS HAVE BEEN DELETED. IDAHO NUCLEAR CORPORATION, FROM A BLAW-KNOX DRAWING, 3/1968. INL INDEX NO. 530-0100-00-400-011646, REV. 0. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Buy or sell used musical instruments | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
David Toback re-elected CDF co-spokesperson | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
Plans for crash-tested bridge railings for longitudinal wood decks on low-volume roads
Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson
1998-01-01
The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln (MwRSF); and the Forest Service, National Forest System, Engineering. Three railings were developed and successfully...
NASA Technical Reports Server (NTRS)
1977-01-01
The design and testing of high bypass geared turbofan engines with nacelles forming the propulsion systems for short haul passenger aircraft are considered. The test results demonstrate the technology required for externally blown flap aircraft for introduction into passenger service in the 1980's. The equipment tested is described along with the test facility and instrumentation. A chronological history of the test and a summary of results are given.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-09
...:30 a.m. until 12:30 p.m. on April 26. The meeting is open to the public. The purpose of the Committee... should be sent to Krishna K. Banga, Senior Structural Engineer, Facilities Standards Service, Office of..., 2012 (Tele-Conf.) meetings--10:00 a.m. Break for lunch--12:00 p.m. Structural and Fire-Safety sub...
LPT. Shield test facility (TAN646). Floor plan for water treatment ...
LPT. Shield test facility (TAN-646). Floor plan for water treatment room on west facade, tank and filter locations in basement along service tunnel and in coupling station. Ralph M. Parsons 1229-17 ANP/GE-6-646-P-2. April 1957. INEEL Index code no. 037-0645/0646-51-693-107387 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
2016-11-17
A test unit, or prototype, of NASA's Advanced Plant Habitat (APH) was delivered to the Space Station Processing Facility at the agency's Kennedy Space Center in Florida. Inside a laboratory, Engineering Services Contract engineers set up test parameters on computers. From left, are Glenn Washington, ESC quality engineer; Claton Grosse, ESC mechanical engineer; and Jeff Richards, ESC project scientist. The APH is the largest plant chamber built for the agency. It will have 180 sensors and four times the light output of Veggie. The APH will be delivered to the International Space Station in March 2017.
Instrument Systems Analysis and Verification Facility (ISAVF) users guide
NASA Technical Reports Server (NTRS)
Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.
1985-01-01
The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.
NASA Technical Reports Server (NTRS)
Cooper, Beth A.
1997-01-01
Workplace and environmental noise issues at NASA Lewis Research Center are effectively managed via a three-part program that addresses hearing conservation, community noise control, and noise control engineering. The Lewis Research Center Noise Exposure Management Program seeks to limit employee noise exposure and maintain community acceptance for critical research while actively pursuing engineered controls for noise generated by more than 100 separate research facilities and the associated services required for their operation.
Conceptual planning for Space Station life sciences human research project
NASA Technical Reports Server (NTRS)
Primeaux, Gary R.; Miller, Ladonna J.; Michaud, Roger B.
1986-01-01
The Life Sciences Research Facility dedicated laboratory is currently undergoing system definition within the NASA Space Station program. Attention is presently given to the Humam Research Project portion of the Facility, in view of representative experimentation requirement scenarios and with the intention of accommodating the Facility within the Initial Operational Capability configuration of the Space Station. Such basic engineering questions as orbital and ground logistics operations and hardware maintenance/servicing requirements are addressed. Biospherics, calcium homeostasis, endocrinology, exercise physiology, hematology, immunology, muscle physiology, neurosciences, radiation effects, and reproduction and development, are among the fields of inquiry encompassed by the Facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... submitted via the U.S. Postal Service to Naval Facilities Engineering Command Atlantic, Attn: Code EV21/CZ... via the project Web site ( http://www.mmaseis.com ). All statements submitted during the public review... in writing at the public meetings, via the U.S. Postal Service, or electronically via the public Web...
From Nigel Lockyer: Five things you should know | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
MicroBooNE project team recognized by Department of Energy | News
Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of
CASIS Fact Sheet: Hardware and Facilities
NASA Technical Reports Server (NTRS)
Solomon, Michael R.; Romero, Vergel
2016-01-01
Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS
DOT National Transportation Integrated Search
1981-11-01
Coast Guard Vessel Traffic Service (VTS) facilities rely heavily on radio communications to acquire the location of vessels and disseminate this information to other interested shipping. As the communication requirements change, the Coast Guard must ...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., and crop spraying. (2) Drainage systems and facilities in farm areas to sustain agricultural production or protect farmers and rural residents from water damage. (3) Agricultural water management... agreement: (1) To pay construction costs including cost of engineering and related services for increasing...
Code of Federal Regulations, 2010 CFR
2010-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2014 CFR
2014-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2012 CFR
2012-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2011 CFR
2011-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2013 CFR
2013-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Establishment of a National Accelerator Facility: Design and construction phase
NASA Astrophysics Data System (ADS)
1981-06-01
The main components of an accelerator facility for nuclear physics, isotope production, and radiotherapy in South Africa are in 8-MeV solid pole injector cyclotron and a separated sector cyclotron with a k-value of 200 MeV. Progress made in the development of the light ion injector and in the design of the control and beam transport systems is described. Mechanical and engineering tasks associated with component manufacture are discussed as well as the construction of the building to house the facility and the installation of necessary services.
List of DOE radioisotope customers with summary of radioisotope shipments, FY 1979
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burlison, J.S.
1980-06-01
The fifteenth edition of the radioisotope customer list was prepared at the request of the Division of Financial Services, Office of the Assistant Secretary for Environment, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory; Pacific Northwest Laboratory; Brookhaven National Laboratory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Rocky Flats Area Office; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: Isotope suppliers, facility, contracts and isotopes or services supplied; alphabetical list ofmore » customers, and isotopes purchased; alphabetical list of isotopes cross-referenced to customer numbers; geographical location of radioisotope customers; and radioisotope sales and transfers-FY 1979.« less
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
Air Quality Management Using Pollution Prevention: A Joint Service Approach
1998-03-01
sites to promote polymerization. High solids coatings may be one or two component systems based on acrylic , alkyd , epoxy, polyester, or urethane...formulation to form high molecular weight polymers. Examples include acrylic , epoxy/polyester hybrid , functional epoxy, thin film epoxy, and urethane...Air Human System Center (HSC/OEBQ) Naval Facilities Engineering Service Center (NFESC) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 9
Biomedical equipment and medical services in India.
Sahay, K B; Saxena, R K
Varieties of Biomedical Equipment (BME) are now used for quick diagnosis, flawless surgery and therapeutics etc. Use of a malfunctioning BME could result in faulty diagnosis and wrong treatment and can lead to damaging or even devastating aftermath. Modern Biomedical Equipments inevitably employ highly sophisticated technology and use complex systems and instrumentation for best results. To the best of our knowledge the medical education in India does not impart any knowledge on the theory and design of BME and it is perhaps not possible also. Hence there is need for a permanent mechanism which can maintain and repair the biomedical equipments routinely before use and this can be done only with the help of qualified Clinical Engineers. Thus there is a genuine need for well organized cadre of Clinical Engineers who would be persons with engineering background with specialization in medical instrumentation. These Clinical engineers should be made responsible for the maintenance and proper functioning of BME. Every hospital or group of hospitals in the advanced countries has a clinical engineering unit that takes care of the biomedical equipments and systems in the hospital by undertaking routine and preventive maintenance, regular calibration of equipments and their timely repairs. Clinical engineers should be thus made an essential part of modern health care system and services. Unfortunately such facilities and mechanism do not exist in India. To make BME maintenance efficient and flawless in India, study suggests following measures and remedies: (i) design and development of comprehensive computerized database for BME (ii) cadre of Clinical engineers (iii) online maintenance facility and (iv) farsighted managerial skill to maximize accuracy, functioning and cost effectiveness.
Advanced Plant Habitat - Packing and Planting Seeds
2017-02-15
Dr. Oscar Monje, a research scientist, packs a growing substrate called arcillite in the science carrier, or base, of the Advanced Plant Habitat (APH) inside a laboratory at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Seated at right is Susan Manning-Roach, a quality assurance specialist on the Engineering Services Contract. Developed by NASA and ORBITEC of Madison, Wisconsin, the APH is the largest plant chamber built for the agency. It is a fully automated plant growth facility that will be used to conduct bioscience research on the International Space Station. The APH will be delivered to the space station aboard future Commercial Resupply Services missions.
BAG PASSOUT SEALER FOR WATER-SHIELDED CAVE FACILITY (Engineering Materials)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1963-10-31
The water-shielded cave facility is used in processing irradiated slugs for recovery of americium, curium, berkelium, californium, einsteinium, and fermium. The remotely operated, plastic-bag passout sealer is used in removing isotopic fractions for storage in the rear or for removing radioactive waste for placement in the waste storage containers. The unit is accessible by both the primary inclosure master-slaves and the service area master-slaves. (F.L.S.)
Corps of Engineers’ Acquisition of Fish Hatchery Proves Costly.
1981-09-18
location, size, esti- mated cost, design , and construction timetables for facilities needed to meet the steelhead production requirements. To limit...hatchery "* * * is not recognized to be one of the more efficient and productive facilities in Idaho due to obvious con- straints in design , construction...agency’s decision to supply the product or service it- self because it would cost less must be supported by a comparativ , cost analysis. According to Corps
48 CFR 27.303 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...
48 CFR 27.303 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...
48 CFR 27.303 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...
48 CFR 27.303 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...
PBF Control Building auxiliary features, including fire hose house and ...
PBF Control Building auxiliary features, including fire hose house and sewage system. Ebasco Services 1205 PER/PER-A-4. INEEL undex no. 760-0619-00-205-123024 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Rehabilitation of the Rocket Vehicle Integration Test Stand at Edwards Air Force Base
NASA Technical Reports Server (NTRS)
Jones, Daniel S.; Ray, Ronald J.; Phillips, Paul
2005-01-01
Since initial use in 1958 for the X-15 rocket-powered research airplane, the Rocket Engine Test Facility has proven essential for testing and servicing rocket-powered vehicles at Edwards Air Force Base. For almost two decades, several successful flight-test programs utilized the capability of this facility. The Department of Defense has recently demonstrated a renewed interest in propulsion technology development with the establishment of the National Aerospace Initiative. More recently, the National Aeronautics and Space Administration is undergoing a transformation to realign the organization, focusing on the Vision for Space Exploration. These initiatives provide a clear indication that a very capable ground-test stand at Edwards Air Force Base will be beneficial to support the testing of future access-to-space vehicles. To meet the demand of full integration testing of rocket-powered vehicles, the NASA Dryden Flight Research Center, the Air Force Flight Test Center, and the Air Force Research Laboratory have combined their resources in an effort to restore and upgrade the original X-15 Rocket Engine Test Facility to become the new Rocket Vehicle Integration Test Stand. This report describes the history of the X-15 Rocket Engine Test Facility, discusses the current status of the facility, and summarizes recent efforts to rehabilitate the facility to support potential access-to-space flight-test programs. A summary of the capabilities of the facility is presented and other important issues are discussed.
State-of-the-art HDU's critical importance.
Green, Philip
2012-09-01
Phil Green, senior project engineer at independent building services company, Shepherd Engineering Services (SES), describes SES's creation a new 'state-of-the-art', 4.5 million sterling pounds, high dependency unit (HDU) at The James Cook University Hospital, Middlesbrough. Completion of the 16-bed HDU, part of a wider South Tees Hospitals NHS Foundation Trust investment programme to remodel and enhance the hospital's facilities, follows last September's completion, also by SES, of the Endeavour Unit (HEJ - November 2011), a new oncology satellite building built as a key element of the Trust's 30 million sterling pounds expansion and redevelopment of its Radiotherapy Unit at the Middlesbrough hospital.
Tail Service Mast Umbilical Arrival
2016-08-02
A crane lowers the first Tail Service Mast Umbilical (TSMU) onto a test stand at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
1989-09-01
18:2). A recent survey by the Strategic Air Command (SAC) Mechanical Fquipment Management Evaluation Team ( MEMET ) determined that equipment was...identified by MEMET included Maintenance Action Sheets (MAS) that reported work which was not completed, and other MAS which annotated recurring work...readily apparent. Problem Military. The Deputy Chief of Staff for Engineering and Services, HQ SAC, established the MEMET in 1984 in response to a
NASA Astrophysics Data System (ADS)
1980-08-01
Work on the plant support subsystems and engineering services is reported. The master control system, thermal storage subsystem, receiver unit, and the beam characterization system were reviewed. Progress in program management and system integration is highlighted.
48 CFR 36.601-3 - Applicable contracting procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Services 36.601-3 Applicable contracting procedures. (a)(1) For facility design contracts, the statement of work shall require that the architect-engineer specify, in the construction design specifications, use..., availability, price reasonableness, and cost-effectiveness. Where appropriate, the statement of work also shall...
2003-03-04
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
1997-01-22
KENNEDY SPACE CENTER, FLA. - In KSC's Vertical Processing Facility, Louise Kleba of the Vehicle Integration Test Team (VITT) and engineer Devin Tailor of Goddard Space Flight Center examine the Pistol Grip Tool (PGT), which was designed for use by astronauts during spacewalks. The PGT is a self-contained, micro-processor controlled, battery-powered tool. It also can be used as a nonpowered ratchet wrench. The experiences of the astronauts on the first Hubble Space Telescope (HST) servicing mission led to recommendations for this smaller, more efficient tool for precision work during spacewalks. The PGT will be used on the second HST servicing mission, STS-82. Liftoff aboard Discovery is scheduled Feb. 11.
Geothermal heat pumps for heating and cooling
NASA Astrophysics Data System (ADS)
Garg, Suresh C.
1994-03-01
Naval Facilities Engineering Service Center (NFESC) has been tasked by Naval Shore Facilities Energy Office to evaluate the NAS Patuxent River ground-source heat pump (GHP) installation. A large part of a building's energy consumption consists of heating and air conditioning for occupant comfort. The space heating requirements are normally met by fossil-fuel-fired equipment or electric resistance heating. Cooling is provided by either air conditioners or heat pumps, both using electricity as an energy source.
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2013 CFR
2013-07-01
... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2014 CFR
2014-07-01
... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 1 2011-10-01 2011-10-01 false Purpose. 9.1 Section 9.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.1 Purpose. To enhance the availability of DHHS scientific research...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose. 9.1 Section 9.1 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.1 Purpose. To enhance the availability of DHHS scientific research...
75 FR 65551 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... at a $3.00 PFC Level: New terminal development schematic preliminary engineering study and design... for Collection and Use: Air carrier apron. Pavement condition inventory. New terminal building... construction. De-icing treatment plant. Domestic water service. CTX design and installation. Landside planning...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 1 2014-10-01 2014-10-01 false Restrictions. 9.5 Section 9.5 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.5 Restrictions. (a) Each individual authorized to use Department...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false Restrictions. 9.5 Section 9.5 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.5 Restrictions. (a) Each individual authorized to use Department...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Restrictions. 9.5 Section 9.5 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.5 Restrictions. (a) Each individual authorized to use Department...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 1 2012-10-01 2012-10-01 false Restrictions. 9.5 Section 9.5 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.5 Restrictions. (a) Each individual authorized to use Department...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 1 2011-10-01 2011-10-01 false Restrictions. 9.5 Section 9.5 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION USE OF HHS RESEARCH FACILITIES BY ACADEMIC SCIENTISTS, ENGINEERS, AND STUDENTS § 9.5 Restrictions. (a) Each individual authorized to use Department...
Trending Technologies for Indoor FM: Looking for "Geo" in Information
NASA Astrophysics Data System (ADS)
Gunduz, M.; Isikdag, U.; Basaraner, M.
2016-10-01
Today technological developments in the Architecture Engineering and Construction (AEC) industry provides opportunities to build huge and complex buildings and facilities. In order to operate these facilities and to meet the requirements of the occupants and also to manage energy, waste and to keep all facility services operational, several Facility Management (FM) solutions were developed. This paper starts by presenting a state of art review of research related to Indoor Facility Management Systems. Later, a textual analysis focused to identify the research trends in this field is presented in the paper. The result of the literature review and textual analysis indicates that current research in Indoor FM Systems is underestimating the role of Geoinformation, Geoinformation models and systems.
Space Physics Data Facility Web Services
NASA Technical Reports Server (NTRS)
Candey, Robert M.; Harris, Bernard T.; Chimiak, Reine A.
2005-01-01
The Space Physics Data Facility (SPDF) Web services provides a distributed programming interface to a portion of the SPDF software. (A general description of Web services is available at http://www.w3.org/ and in many current software-engineering texts and articles focused on distributed programming.) The SPDF Web services distributed programming interface enables additional collaboration and integration of the SPDF software system with other software systems, in furtherance of the SPDF mission to lead collaborative efforts in the collection and utilization of space physics data and mathematical models. This programming interface conforms to all applicable Web services specifications of the World Wide Web Consortium. The interface is specified by a Web Services Description Language (WSDL) file. The SPDF Web services software consists of the following components: 1) A server program for implementation of the Web services; and 2) A software developer s kit that consists of a WSDL file, a less formal description of the interface, a Java class library (which further eases development of Java-based client software), and Java source code for an example client program that illustrates the use of the interface.
Engineering directorate technical facilities catalog
NASA Technical Reports Server (NTRS)
Maloy, Joseph E.
1993-01-01
The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).
1984-09-12
423, R. Jones ATTN: DAEN-ECE-T ATTN: DAEN-RDL DEPARTMENT OF THE AIR FORCE ATTN: DAEN-RDM. J. Healy ATTN: DAEN-ZCM Air Force Engineering & Services Ctr...31 7 Comparison Chart of Various Femperature Sensors (Prepared by HY-CAL Engineering ) ... ...... 36 8 Temperature Sensor Requirements and...Positions * TRS Valve Positions; LOX, AL, N2 Solenoid and Control . - Valve Positions 1.4 Air Compressor System Control * Valve Positions 0 Pressure
Facility siting as a decision process at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wike, L.D.
1995-12-31
Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating amore » facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts.« less
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
FE Garan servicing the FCF in the US Lab
2011-05-26
ISS028-E-005602 (26 May 2011) --- NASA astronaut Ron Garan, Expedition 28 flight engineer, services the Fluids Combustion Facility in the Fluids Integrated Rack on the Destiny lab aboard the International Space Station by changing out the Bio sample on the Bio Base. Garan and two Russian cosmonaut crewmates for Expedition 28 will be joined by three more crew members on the station in about one and a half weeks.
Espey, Huston & Associates Technical Library. A Proposal.
ERIC Educational Resources Information Center
Fortine, Suellen
This proposal for the establishment of a library or information center for an environmental and engineering consulting firm in Texas is divided into two phases--current problems, and future expansion of library service. Major considerations include informational problems of the existing small library facility, i.e., locational and subject access,…
Security/Life Safety: A Need for Change.
ERIC Educational Resources Information Center
Ellsworth, Douglas
2003-01-01
In response to legislation, colleges and universities in several states must prepare to install sprinkler systems. Four basic issues an engineering study should examine include: whether the existing water service has the size, capacity, and pressure to support a sprinkler system; whether the protected facility will have to comply with more…
2017-10-27
Charles Spern, project manager on the Engineering Services Contract, communicates instructions for the Veggie system to astronaut Joe Acaba on the International Space Station. Spern is in the Experiment Monitoring Room in the Space Station Processing Facility at Kennedy Space Center in Florida. Three different varieties of plants from the Veg-03D plant experiment were harvested.
Code of Federal Regulations, 2013 CFR
2013-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
13. Photographic copy of site plan displaying Test Stand 'C' ...
13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).
Designing an Alternate Mission Operations Control Room
NASA Technical Reports Server (NTRS)
Montgomery, Patty; Reeves, A. Scott
2014-01-01
The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.
Detail view in engine bay three in the the aft ...
Detail view in engine bay three in the the aft fuselage of the Orbiter Discovery. This view shows the engine interface fittings and the hydraulic-actuator support structure. The propellant feed lines are the large plugged and capped orifices. Note the handwritten references on the thrust plate in proximity to the actuators that read E3 Pitch and E3 Yaw. This view was taken from a service platform in the Orbiter Processing Facility at Kennedy Space Center. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Tail Service Mast Umbilical Arrival
2016-08-02
A heavy-lift transport truck arrives at the Launch Equipment Test Facility (LETF) at NASA’s Kennedy Space Center in Florida, with the first of two Tail Service Mast Umbilicals (TSMU) for NASA’s Space Launch System (SLS). Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
Technicians assist as a crane is used to lift the first Tail Service Mast Umbilical (TSMU) into the vertical position at the Launch Equipment Test Facility (LETF) at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
A crane is prepared to help lift the first Tail Service Mast Umbilical (TSMU) for NASA’s Space Launch System (SLS) at the Launch Equipment Test Facility (LETF) at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
A crane is attached to the first Tail Service Mast Umbilical (TSMU) for NASA’s Space Launch System (SLS) at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
A crane lifts the first Tail Service Mast Umbilical (TSMU) up for placement on a test stand at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
Technician monitors the progress as a crane lowers the first Tail Service Mast Umbilical (TSMU) onto a test stand at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
A technician monitors the progress as a crane lifts the first Tail Service Mast Umbilical (TSMU) for transfer to a test stand at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Quality assurance and accreditation of engineering education in Jordan
NASA Astrophysics Data System (ADS)
Aqlan, Faisal; Al-Araidah, Omar; Al-Hawari, Tarek
2010-06-01
This paper provides a study of the quality assurance and accreditation in the Jordanian higher education sector and focuses mainly on engineering education. It presents engineering education, accreditation and quality assurance in Jordan and considers the Jordan University of Science and Technology (JUST) for a case study. The study highlights the efforts undertaken by the faculty of engineering at JUST concerning quality assurance and accreditation. Three engineering departments were accorded substantial equivalency status by the Accreditation Board of Engineering and Technology in 2009. Various measures of quality improvement, including curricula development, laboratories improvement, computer facilities, e-learning, and other supporting services are also discussed. Further assessment of the current situation is made through two surveys, targeting engineering instructors and students. Finally, the paper draws conclusions and proposes recommendations to enhance the quality of engineering education at JUST and other Jordanian educational institutions.
OA-7 Mate Service Module to Cargo Module
2017-02-14
In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians and engineers mate a Cygnus spacecraft's pressurized cargo module to its service module. Cygnus is being prepared to deliver thousands of pounds of supplies, equipment and scientific research materials on the Orbital ATK CRS-7 mission to the International Space Station. Scheduled to launch on March 19, 2017, the commercial resupply services mission will lift off atop a United Launch Alliance Atlas V rocket from Space launch Complex 41 at Cape Canaveral Air Force Station.
ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO ...
ETR COMPLEX. CAMERA FACING SOUTH. FROM BOTTOM OF VIEW TO TOP: MTR, MTR SERVICE BUILDING, ETR CRITICAL FACILITY, ETR CONTROL BUILDING (ATTACHED TO ETR), ETR BUILDING (HIGH-BAY), COMPRESSOR BUILDING (ATTACHED AT LEFT OF ETR), HEAT EXCHANGER BUILDING (JUST BEYOND COMPRESSOR BUILDING), COOLING TOWER PUMP HOUSE, COOLING TOWER. OTHER BUILDINGS ARE CONTRACTORS' CONSTRUCTION BUILDINGS. INL NEGATIVE NO. 56-4105. Unknown Photographer, ca. 1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
2011-10-01
Regulatory Council LDPE low-density polyethylene MDL minimum detection limit NAVFAC ESC Naval Facilities Engineering Command Engineering Service...membrane sampler design consists of a tubular-shaped bag made of flexible low-density polyethylene ( LDPE ) (Vroblesky, 2001a, 2001b). The LDPE tube is...requirements, and can be constructed from small-diameter LDPE tubing that fits into small- 4 diameter wells. These polyethylene diffusion bag
2011-08-01
sodium nitrate NaOCl sodium hypochlorite NAVFAC-ESC Naval Facilities Engineering Command-Engineering Service Center NDMA n-nitrosodimethylamine NL...nitrosodimethylamine ( NDMA ) was measured in effluent from the second TGAC bed at 39 ng/L. No other nitrosamines were detected in any other sampling event...was 6.3 ng/L NDMA in an effluent sample of the prechlorination/oxidant train. 6.6.3.4 General Chemistry Results With a few exceptions, values of pH
Facility design consideration for continuous mix production of class 1.3 propellant
NASA Technical Reports Server (NTRS)
Williamson, K. L.; Schirk, P. G.
1994-01-01
In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.
Management self assessment plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debban, B.L.
Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less
Operational support and service concepts for observatories
NASA Astrophysics Data System (ADS)
Emde, Peter; Chapus, Pierre
2014-08-01
The operational support and service for observatories aim at the provision, the preservation and the increase of the availability and performance of the entire structural, mechanical, drive and control systems of telescopes and the related infrastructure. The operational support and service levels range from the basic service with inspections, preventive maintenance, remote diagnostics and spare parts supply over the availability service with telephone hotline, online and on-site support, condition monitoring and spare parts logistics to the extended service with operations and site and facility management. For the level of improvements and lifecycle management support they consist of expert assessments and studies, refurbishments and upgrades including the related engineering and project management activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mulder, R.U.; Benneche, P.E.; Hosticka, B.
The objective of the DOE supported Reactor Sharing Program is to increase the availability of university nuclear reactor facilities to non-reactor-owning educational institutions. The educational and research programs of these user institutions is enhanced by the use of the nuclear facilities. Several methods have been used by the UVA Reactor Facility to achieve this objective. First, many college and secondary school groups toured the Reactor Facility and viewed the UVAR reactor and associated experimental facilities. Second, advanced undergraduate and graduate classes from area colleges and universities visited the facility to perform experiments in nuclear engineering and physics which would notmore » be possible at the user institution. Third, irradiation and analysis services at the Facility have been made available for research by faculty and students from user institutions. Fourth, some institutions have received activated material from UVA from use at their institutions. These areas are discussed in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objective of the DOE supported Reactor Sharing Program is to increase the availability of university nuclear reactor facilities to non-reactor-owning educational institutions. The educational and research programs of these user institutions is enhanced by the use of the nuclear facilities. Several methods have been used by the UVA Reactor Facility to achieve this objective. First, many college and secondary school groups toured the Reactor Facility and viewed the UVAR reactor and associated experimental facilities. Second, advanced undergraduate and graduate classes from area colleges and universities visited the facility to perform experiments in nuclear engineering and physics which would notmore » be possible at the user institution. Third, irradiation and analysis services at the Facility have been made available for research by faculty and students from user institutions. Fourth, some institutions have received activated material from UVA for use at their institutions. These areas are discussed further in the report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mulder, R.U.; Benneche, P.E.; Hosticka, B.
The objective of the DOE supported Reactor Sharing Program is to increase the availability of university nuclear reactor facilities to non-reactor-owning educational institutions. The educational and research programs of these user institutions is enhanced by the use of the nuclear facilities. Several methods have been used by the UVA Reactor Facility to achieve this objective. First, many college and secondary school groups toured the Reactor Facility and viewed the UVAR reactor and associated experimental facilities. Second, advanced undergraduate and graduate classes from area colleges and universities visited the facility to perform experiments in nuclear engineering and physics which would notmore » be possible at the user institution. Third, irradiation and analysis services at the Facility have been made available for research by faculty and students from user institutions. Fourth, some institutions have received activated material from UVA for use at their institutions. These areas are discussed here.« less
NCAR Earth Observing Laboratory - An End-to-End Observational Science Enterprise
NASA Astrophysics Data System (ADS)
Rockwell, A.; Baeuerle, B.; Grubišić, V.; Hock, T. F.; Lee, W. C.; Ranson, J.; Stith, J. L.; Stossmeister, G.
2017-12-01
Researchers who want to understand and describe the Earth System require high-quality observations of the atmosphere, ocean, and biosphere. Making these observations not only requires capable research platforms and state-of-the-art instrumentation but also benefits from comprehensive in-field project management and data services. NCAR's Earth Observing Laboratory (EOL) is an end-to-end observational science enterprise that provides leadership in observational research to scientists from universities, U.S. government agencies, and NCAR. Deployment: EOL manages the majority of the NSF Lower Atmosphere Observing Facilities, which includes research aircraft, radars, lidars, profilers, and surface and sounding systems. This suite is designed to address a wide range of Earth system science - from microscale to climate process studies and from the planet's surface into the Upper Troposphere/Lower Stratosphere. EOL offers scientific, technical, operational, and logistics support to small and large field campaigns across the globe. Development: By working closely with the scientific community, EOL's engineering and scientific staff actively develop the next generation of observing facilities, staying abreast of emerging trends, technologies, and applications in order to improve our measurement capabilities. Through our Design and Fabrication Services, we also offer high-level engineering and technical expertise, mechanical design, and fabrication to the atmospheric research community. Data Services: EOL's platforms and instruments collect unique datasets that must be validated, archived, and made available to the research community. EOL's Data Management and Services deliver high-quality datasets and metadata in ways that are transparent, secure, and easily accessible. We are committed to the highest standard of data stewardship from collection to validation to archival. Discovery: EOL promotes curiosity about Earth science, and fosters advanced understanding of the processes involved in observational research. Through EOL's Education and Outreach Program, we strive to inspire and develop the next generation of observational scientists and engineers by offering a range of educational, experiential, and outreach opportunities, including engineering internships.
OA-7 Veggie Series 1 Processing
2017-02-15
Charles Spern, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
Advanced Plant Habitat - Packing and Planting Seeds
2017-02-15
Dr. Oscar Monje, (far right) a research scientist, packs a growing substrate called arcillite in the science carrier, or base, of the Advanced Plant Habitat (APH) inside a laboratory at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Assisting him is Jeffrey Richards, project science coordinator with SGT on the Engineering Services Contract (ESC). Seated in the foreground is Susan Manning-Roach, a quality assurance specialist, also with ESC. Developed by NASA and ORBITEC of Madison, Wisconsin, the APH is the largest plant chamber built for the agency. It is a fully automated plant growth facility that will be used to conduct bioscience research on the International Space Station. The APH will be delivered to the space station aboard future Commercial Resupply Services missions.
Space Electronic Test Engineering
NASA Technical Reports Server (NTRS)
Chambers, Rodney D.
2004-01-01
The Space Power and Propulsion Test Engineering Branch at NASA Glenn Research center has the important duty of controlling electronic test engineering services. These services include test planning and early assessment of Space projects, management and/or technical support required to safely and effectively prepare the article and facility for testing, operation of test facilities, and validation/delivery of data to customer. The Space Electronic Test Engineering Branch is assigned electronic test engineering responsibility for the GRC Space Simulation, Microgravity, Cryogenic, and Combustion Test Facilities. While working with the Space Power and Propulsion Test Engineering Branch I am working on several different assignments. My primary assignment deals with an electrical hardware unit known as Sunny Boy. Sunny Boy is a DC load Bank that is designed for solar arrays in which it is used to convert DC power form the solar arrays into AC power at 60 hertz to pump back into the electricity grid. However, there are some researchers who decided that they would like to use the Sunny Boy unit in a space simulation as a DC load bank for a space shuttle or even the International Space Station hardware. In order to do so I must create a communication link between a computer and the Sunny Boy unit so that I can preset a few of the limits (such power, set & constant voltage levels) that Sunny Boy will need to operate using the applied DC load. Apart from this assignment I am also working on a hi-tech circuit that I need to have built at a researcher s request. This is a high voltage analog to digital circuit that will be used to record data from space ion propulsion rocket booster tests. The problem that makes building this circuit so difficult is that it contains high voltage we must find a way to lower the voltage signal before the data is transferred into the computer to be read. The solution to this problem was to transport the signal using infrared light which will lower the voltage signal down low enough so that it is harmless to a computer. Along with my involvement in the Space Power and Propulsion Test Engineering Branch, I am obligated to assist all other members of the branch in their work. This will help me to strengthen and extend my knowledge of Electrical Engineering.
Noguchi in the JPM during Expedition 22
2010-01-15
ISS022-E-026221 (15 Jan. 2010) --- Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi, Expedition 22 flight engineer, services the Fluid Physics Experiment Facility/Marangoni Surface (FPEF MS) Core hardware in the Kibo laboratory of the International Space Station. The Marangoni convection experiment in the FPEF examines fluid tension flow in micro-G.
Noguchi in the JPM during Expedition 22
2010-01-14
ISS022-E-025474 (14 Jan. 2010) --- Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi, Expedition 22 flight engineer, services the Fluid Physics Experiment Facility/Marangoni Surface (FPEF MS) Core hardware in the Kibo laboratory of the International Space Station. The Marangoni convection experiment in the FPEF examines fluid tension flow in micro-G.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... supplied by the workers and confirmed by JLG Industries, Inc. revealed that the Hagerstown, Maryland facility operated in conjunction with JLG-McConnellsburg in the production of access equipment and supplied design engineering, global procurement supply chain, safety, and reliability services used in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... supplied by the workers and confirmed by JLG Industries, Inc. revealed that the Hagerstown, Maryland facility operated in conjunction with JLG-McConnellsburg in the production of access equipment and supplied design engineering, global procurement supply chain, safety, and reliability services used in the...
Oxygen Assessments Ensure Safer Medical Devices
NASA Technical Reports Server (NTRS)
2013-01-01
A team at White Sands Test Facility developed a test method to evaluate fire hazards in oxygen-enriched environments. Wendell Hull and Associates, located in Las Cruces, New Mexico, entered a Space Act Agreement with NASA and now provides services including fire and explosion investigations, oxygen testing and training, and accident reconstruction and forensic engineering.
Remediation of TNT and RDX in Groundwater Using Zero-Valent Iron Permeable Reactive Barriers
2008-04-01
3 3.0 TECHNOLOGY DESCRIPTION ...................................................................................... 5 3.1... hydroxide NAVFAC-ESC Naval Facilities Engineering Service Center O&M operation and maintenance OHSU Oregon Health and Science University OD...remediation costs that may jeopardize major DoD programs and initiatives. 3 This page left blank intentionally. 3.0 TECHNOLOGY DESCRIPTION
PBF Reactor Building (PER620). Detail of arrangement of highdensity blocks ...
PBF Reactor Building (PER-620). Detail of arrangement of high-density blocks and other basement shielding. Date: February 1966. Ebasco Services 1205 PER/PBF 620-A-7. INEEL index no. 761-0620-00-205-123070 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
1997-01-16
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility prepare a solid state recorder for installation in a protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission. The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble. The solid state recorder has no moving parts to wear out. It also is more flexible than a reel-to-reel recorder and can store 10 times as much data. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
1997-01-16
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility install a solid state recorder into a transport assembly in its protective enclosure as part of the prelaunch preparations for STS-82, the second Hubble Space Telescope servicing mission. The digital solid state recorder will replace one of three engineering/science tape recorders on Hubble. The solid state recorder has no moving parts to wear out. It also is more flexible than a reel-to-reel recorder and can store 10 times as much data. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
NASA Astrophysics Data System (ADS)
Carroll, Kieran A.
2000-01-01
This paper describes an International Space Station (ISS) experiment-support facility being developed by Dynacon for the Canadian Space Agency (CSA), based on microsatellite technology. The facility is called the ``Intravehicular Maneuverable Platform,'' or IMP. The core of IMP is a small, free-floating platform (or ``bus'') deployed inside one of the pressurized crew modules of ISS. Exchangeable experimental payloads can then be mounted to the IMP bus, in order to carry out engineering development or demonstration tests, or microgravity science experiments: the bus provides these payloads with services typical of a standard satellite bus (power, attitude control, etc.). The IMP facility takes advantage of unique features of the ISS, such as the Shuttle-based logistics system and the continuous availability of crew members, to greatly reduce the expense of carrying out space engineering experiments. Further cost reduction has been made possible by incorporating technology that Dynacon has developed for use in a current microsatellite mission. Numerous potential payloads for IMP have been identified, and the first of these (a flexible satellite control experiment) is under development by Dynacon and the University of Toronto's Institute for Aerospace Studies, for the CSA. .
Unveiling of sign for Walter C. Williams Research Aircraft Integration Facility
NASA Technical Reports Server (NTRS)
1995-01-01
In a brief ceremony following a memorial service for the late Walter C. Williams on November 17, 1995, the Integrated Test Facility (ITF) at the NASA Dryden Flight Research Center at Edwards, California, was formally renamed the Walter C. Williams Research Aircraft Integration Facility. Shown is the family of Walt Williams: Helen, his widow, sons Charles and Howard, daughter Elizabeth Williams Powell, their spouses and children unveiling the new sign redesignating the Facility. The test facility provides state-of-the-art capabilities for thorough ground testing of advanced research aircraft. It allows researchers and technicians to integrate and test aircraft systems before each research flight, which greatly enhances the safety of each mission. In September 1946 Williams became engineer-in-charge of a team of five engineers who arrived at Muroc Army Air Base (now Edwards AFB) from the National Advisory Committee for Aeronautics's Langley Memorial Aeronautical Laboratory, Hampton, Virginia (now NASA's Langley Research Center), to prepare for supersonic research flights in a joint NACA-Army Air Forces program involving the rocket-powered X-1. This established the first permanent NACA presence at the Mojave Desert site although initially the five engineers and others who followed them were on temporary assignment. Over time, Walt continued to be in charge during the many name changes for the NACA-NASA organization, with Williams ending his stay as Chief of the NASA Flight Research Center in September 1959 (today NASA's Dryden Flight Research Center).
Application of a Systems Engineering Approach to Support Space Reactor Development
NASA Astrophysics Data System (ADS)
Wold, Scott
2005-02-01
In 1992, approximately 25 Russian and 12 U.S. engineers and technicians were involved in the transport, assembly, inspection, and testing of over 90 tons of Russian equipment associated with the Thermionic System Evaluation Test (TSET) Facility. The entire Russian Baikal Test Stand, consisting of a 5.79 m tall vacuum chamber and related support equipment, was reassembled and tested at the TSET facility in less than four months. In November 1992, the first non-nuclear operational test of a complete thermionic power reactor system in the U.S. was accomplished three months ahead of schedule and under budget. A major factor in this accomplishment was the application of a disciplined top-down systems engineering approach and application of a spiral development model to achieve the desired objectives of the TOPAZ International Program (TIP). Systems Engineering is a structured discipline that helps programs and projects conceive, develop, integrate, test and deliver products and services that meet customer requirements within cost and schedule. This paper discusses the impact of Systems Engineering and a spiral development model on the success of the TOPAZ International Program and how the application of a similar approach could help ensure the success of future space reactor development projects.
Flessa, Steffen; Kouyaté, Bocar
2006-09-01
To present first findings of a cost-of-illness (COI) information system implemented in Nouna health district, Burkina Faso. The entire project will include household and provider tangible COI, whereas this article concentrates on the development of a provider cost information system in rural first-line health facilities. Special forms and reports are prepared to routinely collect capital and recurrent costs of first-line facilities. Inventory lists are designed, and buildings and equipment are assessed by engineers. Total, fixed, variable and average costs are calculated for 15 rural health centres with five cost centres: general outpatient consultation, ambulatory nursing care, deliveries, immunization and other services (neonatal consultation, child care and family planning). In 2003, the average costs per service unit were 1.34 US$ for a general consultation, 0.51 US$ for ambulatory nursing care, 6.73 US$ per delivery, 3.64 US$ per vaccination and 1.11 US$ per service unit of other care. On average, a health centre consumes 29,900 US$ per year for a catchment population of 10,000 inhabitants. The major share of costs is fixed and does not depend on the workload of the health centre. Consequently, the costs of first-line facilities will hardly increase if the demand for health services rises. These findings can be used to improve the health financing in Nouna health district, Burkina Faso.
The NHERI RAPID Facility: Enabling the Next-Generation of Natural Hazards Reconnaissance
NASA Astrophysics Data System (ADS)
Wartman, J.; Berman, J.; Olsen, M. J.; Irish, J. L.; Miles, S.; Gurley, K.; Lowes, L.; Bostrom, A.
2017-12-01
The NHERI post-disaster, rapid response research (or "RAPID") facility, headquartered at the University of Washington (UW), is a collaboration between UW, Oregon State University, Virginia Tech, and the University of Florida. The RAPID facility will enable natural hazard researchers to conduct next-generation quick response research through reliable acquisition and community sharing of high-quality, post-disaster data sets that will enable characterization of civil infrastructure performance under natural hazard loads, evaluation of the effectiveness of current and previous design methodologies, understanding of socio-economic dynamics, calibration of computational models used to predict civil infrastructure component and system response, and development of solutions for resilient communities. The facility will provide investigators with the hardware, software and support services needed to collect, process and assess perishable interdisciplinary data following extreme natural hazard events. Support to the natural hazards research community will be provided through training and educational activities, field deployment services, and by promoting public engagement with science and engineering. Specifically, the RAPID facility is undertaking the following strategic activities: (1) acquiring, maintaining, and operating state-of-the-art data collection equipment; (2) developing and supporting mobile applications to support interdisciplinary field reconnaissance; (3) providing advisory services and basic logistics support for research missions; (4) facilitating the systematic archiving, processing and visualization of acquired data in DesignSafe-CI; (5) training a broad user base through workshops and other activities; and (6) engaging the public through citizen science, as well as through community outreach and education. The facility commenced operations in September 2016 and will begin field deployments beginning in September 2018. This poster will provide an overview of the vision for the RAPID facility, the equipment that will be available for use, the facility's operations, and opportunities for user training and facility use.
Tail Service Mast Umbilical Arrival
2016-08-02
Technicians assist as a crane is used to lift the first Tail Service Mast Umbilical (TSMU) up from the flatbed of the transport truck at the Launch Equipment Test Facility (LETF) at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
Tail Service Mast Umbilical Arrival
2016-08-02
Technicians assist as a crane is used to lift the first Tail Service Mast Umbilical (TSMU) away from the flatbed of the transport truck at the Launch Equipment Test Facility (LETF) at NASA’s Kennedy Space Center in Florida. Two TSMUs will provide liquid propellants and power to the Space Launch System (SLS) rocket’s core stage engine. Both TSMUs will connect to the zero-level deck on the mobile launcher, providing fuel and electricity to the SLS rocket before it launches on Exploration Mission 1. The TSMU will undergo testing and validation at the LETF to verify it is functioning properly. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.
NASA Technical Reports Server (NTRS)
Cooper, Beth A.
1995-01-01
NASA Lewis Research Center is home to more than 100 experimental research testing facilities and laboratories, including large wind tunnels and engine test cells, which in combination create a varied and complex noise environment. Much of the equipment was manufactured prior to the enactment of legislation limiting product noise emissions or occupational noise exposure. Routine facility maintenance and associated construction also contributes to a noise exposure management responsibility which is equal in magnitude and scope to that of several small industrial companies. The Noise Program, centrally managed within the Office of Environmental Programs at LRC, maintains overall responsibility for hearing conservation, community noise control, and acoustical and noise control engineering. Centralized management of the LRC Noise Program facilitates the timely development and implementation of engineered noise control solutions for problems identified via either the Hearing Conservation of Community Noise Program. The key element of the Lewis Research Center Noise Program, Acoustical and Noise Control Engineering Services, is focused on developing solutions that permanently reduce employee and community noise exposure and maximize research productivity by reducing or eliminating administrative and operational controls and by improving the safety and comfort of the work environment. The Hearing Conservation Program provides noise exposure assessment, medical monitoring, and training for civil servant and contractor employees. The Community Noise Program aims to maintain the support of LRC's neighboring communities while enabling necessary research operations to accomplish their programmatic goals. Noise control engineering capability resides within the Noise Program. The noise control engineering, based on specific exposure limits, is a fundamental consideration throughout the design phase of new test facilities, labs, and office buildings. In summary, the Noise Program addresses hearing conservation, community noise control, and acoustical and noise control engineering.
Engine component instrumentation development facility at NASA Lewis Research Center
NASA Technical Reports Server (NTRS)
Bruckner, Robert J.; Buggele, Alvin E.; Lepicovsky, Jan
1992-01-01
The Engine Components Instrumentation Development Facility at NASA Lewis is a unique aeronautics facility dedicated to the development of innovative instrumentation for turbine engine component testing. Containing two separate wind tunnels, the facility is capable of simulating many flow conditions found in most turbine engine components. This facility's broad range of capabilities as well as its versatility provide an excellent location for the development of novel testing techniques. These capabilities thus allow a more efficient use of larger and more complex engine component test facilities.
In-space research, technology and engineering experiments and Space Station
NASA Technical Reports Server (NTRS)
Tyson, Richard; Gartrell, Charles F.
1988-01-01
The NASA Space Station will serve as a technology research laboratory, a payload-servicing facility, and a large structure fabrication and assembly facility. Space structures research will encompass advanced structural concepts and their dynamics, advanced control concepts, sensors, and actuators. Experiments dealing with fluid management will gather data on such fundamentals as multiphase flow phenomena. As requirements for power systems and thermal management grow, experiments quantifying the performance of energy systems and thermal management concepts will be undertaken, together with expanded efforts in the fields of information systems, automation, and robotics.
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. At far left is Dena Richmond, ESC configuration management. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
The present situation of the irradiation application industry and irradiation facilities in Japan
NASA Astrophysics Data System (ADS)
Mizusawa, K.; Baba, T.
2003-08-01
The irradiation application industry and irradiation facilities in Japan have been making slow but steady progress for the past 2-3 years. Beside conventional applications, new ones such as carbon fibers and membrane filters have come into the market. There are a lot of new applications about to emerge. PE tubing, already is in the European market, is being evaluated by end users in Japan. Cleaning of dioxin in exhaust gas was successfully tested at a pilot plant. Cross-linked PTFE and polyamide are waiting customers' evaluations as an engineering plastic. Surface cross-linking of artificial polycarbonate teeth has yielded remarkable experimental results. Cross-linking of polycaprolactone will be useful for biodegradable products. Being aware of the future growth of irradiation industry, contract service providers opened new facilities or increased their capability. Beside in-house facilities, there are now three Co-60 facilities and nine EB facilities available for contract irradiation in Japan.
Environmental review of the Panda-Brandywine cogeneration project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, G.; Keating, R.; Huggins, A.
1997-02-01
The Maryland Public Service Commission (PSC) granted a Certificate of Public Convenience and Necessity (CPCN) to Panda-Brandywine, L.P., to construct and operate a 248-megawatt (electric) generating station near Brandywine, Prince George`s County, Maryland. This report describes PPRP`s evaluation of the environmental and socioeconomic impacts of the Panda-Brandywine facility, summarizes the results of that evaluation, and presents recommendations for license conditions which have been incorporated into Panda`s CPCN. The document includes description of the proposed facility, host facility, and associated linear facilities (transmission line, pipelines); discussion of existing environmental and socioeconomic conditions at the site and in the vicinity; analysis ofmore » the potential air quality, surface water, biological, ground water, socioeconomic, cultural, and noise impacts from the proposed facility; and discussion of critical engineering issues associated with operation of the facility, including water supply, water discharge, and fuel handling.« less
The component-based architecture of the HELIOS medical software engineering environment.
Degoulet, P; Jean, F C; Engelmann, U; Meinzer, H P; Baud, R; Sandblad, B; Wigertz, O; Le Meur, R; Jagermann, C
1994-12-01
The constitution of highly integrated health information networks and the growth of multimedia technologies raise new challenges for the development of medical applications. We describe in this paper the general architecture of the HELIOS medical software engineering environment devoted to the development and maintenance of multimedia distributed medical applications. HELIOS is made of a set of software components, federated by a communication channel called the HELIOS Unification Bus. The HELIOS kernel includes three main components, the Analysis-Design and Environment, the Object Information System and the Interface Manager. HELIOS services consist in a collection of toolkits providing the necessary facilities to medical application developers. They include Image Related services, a Natural Language Processor, a Decision Support System and Connection services. The project gives special attention to both object-oriented approaches and software re-usability that are considered crucial steps towards the development of more reliable, coherent and integrated applications.
Rolling-Bearing Service Life Based on Probable Cause for Removal: A Tutorial
NASA Technical Reports Server (NTRS)
Zaretsky, Erwin V.; Branzai, Emanuel V.
2017-01-01
In 1947 and 1952, Gustaf Lundberg and Arvid Palmgren developed what is now referred to as the Lundberg-Palmgren Model for Rolling Bearing Life Prediction based on classical rolling-element fatigue. Today, bearing fatigue probably accounts for less than 5 percent of bearings removed from service for cause. A bearing service life prediction methodology and tutorial indexed to eight probable causes for bearing removal, including fatigue, are presented, which incorporate strict series reliability; Weibull statistical analysis; available published field data from the Naval Air Rework Facility; and 224,000 rolling-element bearings removed for rework from commercial aircraft engines.
Establishing the overall service quality of engineering education: fuzzy logic approach
NASA Astrophysics Data System (ADS)
Shekhar, N. Chandra; Venkatasubbaiah, K.; Kandukuria, N. R.
2012-12-01
Measuring overall service quality (OSQ) is gaining prominence in higher education due to the increased competition among engineering education institutions (EEIs) and growing awareness about value for money among the public. Determination of OSQ on certain institutional aspects is done by various agencies throughout the world. Each system uses a different set of weighted indicators to measure the overall service quality of institutions. Five service quality factors, namely professionalism, integrated education, facilities, responsiveness and empathy are considered in the study. Trapezoidal fuzzy numbers are used to determine the aggregate weights of the factors to handle the vagueness present in the linguistic values of the stakeholders' subjective opinions. Final weights of the factors are assessed by taking the distances of each factor between Fuzzy Positive Ideal Rating and Fuzzy Negative Ideal Rating. An illustrative study is presented to determine the OSQ of EEIs. The results help to focus on the factors which need immediate attention to enhance the quality of EEIs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The report describes the application of EPA's waste minimization assessment procedures to a torpedo maintenance facility at the Naval Undersea Warfare Engineering Station, Keyport, WA. The assessment focused on the Mark 48 shop and the Mark 46 shop. These shops service the Mark 48 torpedo and the Mark 46 torpedo respectively. The five waste minimization options presented are volume reduction of contaminated clothing, automated cleaning of parts, automated fuel tank draining, modification of the deep sink draining schedule and recycling of mineral spirits.
2016-11-17
A test unit, or prototype, of NASA's Advanced Plant Habitat (APH) was delivered to the Space Station Processing Facility at the agency's Kennedy Space Center in Florida. The APH is the largest plant chamber built for the agency. Oscar Monje, a scientist on the Engineering Services Contract, prepares the base of the APH for engineering development tests to see how the science will integrate with the various systems of the plant habitat. The APH will have about 180 sensors and fourt times the light output of Veggie. The APH will be delivered to the International Space Station in March 2017.
Specialized Veterinary Manpower Needs through 1990,
1982-01-01
vaccines and diagnostic tests; and the increased technical sophistication in artificial insemination , embryo culture and transplantation, and hormonal...are included. Artificial insemination , synchronization of estrus, endocrine therapy, spermatozoan and ovum genetic engineering, and ovum and embryo...hospital facility surrounded by satellite clinics that offer restricted medical and surgical services. 26 Qualified animal-health technicians are used to a
Energy Systems Integration News | Energy Systems Integration Facility |
us at the ESIF. NREL Releases High-Pen PV Handbook for Distribution Engineers As solar photovoltaic PV for Ancillary Services NREL, AES, the Puerto Rico Electric Power Authority, First Solar, and the technologies, such as solar, demand response, and smart consumer appliances Advances in grid design and
Concept Development Modular Hybrid Pier (MHP)
2000-02-01
rated FRP composite bridge or bridge deck is commercially available from Creative Pultrusions, Kansas Structural Systems, Martin - Marietta , Hardcore...NAVAL FACILITIES ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 Contract Report CR 00-001-SHR FINAL REPORT PHASE 1 - CONCEPT...20000301 043 Approved for public release; distribution is unlimited. DTIC QUALITY IMWSOfBD 4 ^^ Printed on recycled paper REPORT DOCUMENTATION PAGE
Bioavailable Ferric Iron (BAFelll) Assay
2007-02-01
citrate dithionite bicarbonate CDBFe citrate dithionite bicarbonate extractable iron cDCE cis-Dichloroethene CDM Camp Dresser & McKee Inc...Defense (DoD) installations. Camp Dresser & McKee Inc. (CDM), in cooperation with the Naval Facilities Engineering Services Center (NFESC), was the...several upgradient and/or cross - gradient background soil samples. Duplicate analysis of samples is recommended. While these recommendations are not
Code of Federal Regulations, 2011 CFR
2011-10-01
... activities necessary for implementing the replacement facilities, including engineering and cost analysis of... in § 101.73 of this chapter. If these parties are unable to reach a negotiated agreement, MSS... reach a negotiated agreement. As described elsewhere in this paragraph (e), MSS Licensees are obligated...
PBF Control Building (PER619) floor plan and elevations. Room numbers ...
PBF Control Building (PER-619) floor plan and elevations. Room numbers and functions. Roof plans for "high" roof and rest of roof. Ebasco Services 1205-PER/PER 619-A-1. Date: July 1965. INEEL index no. 760-0619-00-205-123022 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Service on demand for ISS users
NASA Astrophysics Data System (ADS)
Hüser, Detlev; Berg, Marco; Körtge, Nicole; Mildner, Wolfgang; Salmen, Frank; Strauch, Karsten
2002-07-01
Since the ISS started its operational phase, the need of logistics scenarios and solutions, supporting the utilisation of the station and its facilities, becomes increasingly important. Our contribution to this challenge is a SERVICE On DEMAND for ISS users, which offers a business friendly engineering and logistics support for the resupply of the station. Especially the utilisation by commercial and industrial users is supported and simplified by this service. Our industrial team, consisting of OHB-System and BEOS, provides experience and development support for space dedicated hard- and software elements, their transportation and operation. Furthermore, we operate as the interface between customer and the envisaged space authorities. Due to a variety of tailored service elements and the ongoing servicing, customers can concentrate on their payload content or mission objectives and don't have to deal with space-specific techniques and regulations. The SERVICE On DEMAND includes the following elements: ITR is our in-orbit platform service. ITR is a transport rack, used in the SPACEHAB logistics double module, for active and passive payloads on subrack- and drawer level of different standards. Due to its unique late access and early retrieval capability, ITR increases the flexibility concerning transport capabilities to and from the ISS. RIST is our multi-functional test facility for ISPR-based experiment drawer and locker payloads. The test program concentrates on physical and functional interface and performance testing at the payload developers site prior to the shipment to the integration and launch. The RIST service program comprises consulting, planning and engineering as well. The RIST test suitcase is planned to be available for lease or rent to users, too. AMTSS is an advanced multimedia terminal consulting service for communication with the space station scientific facilities, as part of the user home-base. This unique ISS multimedia kit combines communication technologies, software tools and hardware to provide a simple and cost-efficient access to data from the station, using the interconnection ground subnetwork. BEOLOG is our efficient ground logistics service for the transportation of payload hardware and support equipment from the user location to the launch/landing sites for the ISS service flights and back home. The main function of this service is the planning and organisation of all packaging, handling, storage & transportation tasks according to international rules. In conclusion, we offer novel service elements for logistics ground- and flight-infrastructure, dedicated for ISS users. These services can be easily adapted to the needs of users and are suitable for other μg- platforms as well.
Survey on the possibility of introducing new energy to regional development plans
NASA Astrophysics Data System (ADS)
1988-03-01
This report covers nationwide large-scale resort plans and at the same time studies the possibility of introducing new energy systems, mainly cogeneration, and their effects. Japanese industrial structure is rapidly moving toward information and service areas, and the development of resorts has become very active. With the increase of resort demands, much is expected of resort development as a means of regional promotion. Special features of energy consumption in resort facilities are that annual demand is large, that energy consumption fluctuates greatly, and that energy supply cost is high. These features are especially conspicuous in smaller facilities. Most suited for resort lodging facilities is a co-generation system, especially a diesel engine system. This system is expected to conserve energy; but to promote this system, it is necessary to revise the preferential tax treatment and Fire Service Act to meet the actual circumstances, and to develop a highly reliable system that can be operated unattended. An economical system in view of overall costs is also essential.
BMTC: --A Tool for Standardized Tissue Engineering on Ground and in Space ---
NASA Astrophysics Data System (ADS)
Kern, Peter; Kemmerle, Kurt; Jones, David
ESA is developing the BMTC (Biotechnology Mammalian Tissue Culture Facility) as ground demonstrator in order to: • establish a well characterised terrestrial platform for tissue engineer-ing under defined, reproducible conditions • prepare for future tissue engineering experiments in space using proven, well characterised, modular equipment. In the beginning the facility will be dedicated to support research of bone and cartilage growth under controlled mechanical and/or biochemical stimulation. Meanwhile, the industrial BMTC team has finalised the first model. The BMTC is highly automated system which provides standardized experiment hardware for tissue cultivation and stimulation under controlled conditions and the reproducible execution of the experiment according pre-programmed protocols. The BMTC consists of an incubator for the control of the experiment environment. Internally it offers all experiment relevant subsystems: • two Cultivation Units, each with eight Experiment Chamber Modules optical in-situ sensors for pO2 and pH • the Liquid Handling Device for medium exchange and sample taking • the handling devices for the internal transport of the experiment chamber modules to different experiment services • workstations for uni-axial loading of tissue samples; ZETOS (for bone tissue) / CHONDROS (for cartilage tissue) provision of reproducible displacement profiles measurement of the resulting forces computation of the visco-eleastic properties of the samples provision of flow induced shear stress fluorescence microscope • two different reactor types are included in the baseline flat reactor for 2D-and flat 3D-cultures with flow induced shear stress stimulation compatible with microscope cylindrical 3D-reactor for cultivation of vital bone and cartilage samples compatible with un-directional stimulation / analysis by ZETOS / CHONDROS. The modular, flexible design of the system allows the servicing and accommodation of a wide range of other experiment specific reactors. The functional principles and the essential features for controlled experiments will be reported. This facility complements the research done on ground on osteoporosis and the bone and muscle loss during bed rest studies during space flights. It is considered to become a new in-orbit research tool for tissue engineering and the verification of mechanical or pharmaceutical countermeasures.
Environmental practices for biomedical research facilities.
Medlin, E L; Grupenhoff, J T
2000-01-01
As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360
Fault Tree Based Diagnosis with Optimal Test Sequencing for Field Service Engineers
NASA Technical Reports Server (NTRS)
Iverson, David L.; George, Laurence L.; Patterson-Hine, F. A.; Lum, Henry, Jr. (Technical Monitor)
1994-01-01
When field service engineers go to customer sites to service equipment, they want to diagnose and repair failures quickly and cost effectively. Symptoms exhibited by failed equipment frequently suggest several possible causes which require different approaches to diagnosis. This can lead the engineer to follow several fruitless paths in the diagnostic process before they find the actual failure. To assist in this situation, we have developed the Fault Tree Diagnosis and Optimal Test Sequence (FTDOTS) software system that performs automated diagnosis and ranks diagnostic hypotheses based on failure probability and the time or cost required to isolate and repair each failure. FTDOTS first finds a set of possible failures that explain exhibited symptoms by using a fault tree reliability model as a diagnostic knowledge to rank the hypothesized failures based on how likely they are and how long it would take or how much it would cost to isolate and repair them. This ordering suggests an optimal sequence for the field service engineer to investigate the hypothesized failures in order to minimize the time or cost required to accomplish the repair task. Previously, field service personnel would arrive at the customer site and choose which components to investigate based on past experience and service manuals. Using FTDOTS running on a portable computer, they can now enter a set of symptoms and get a list of possible failures ordered in an optimal test sequence to help them in their decisions. If facilities are available, the field engineer can connect the portable computer to the malfunctioning device for automated data gathering. FTDOTS is currently being applied to field service of medical test equipment. The techniques are flexible enough to use for many different types of devices. If a fault tree model of the equipment and information about component failure probabilities and isolation times or costs are available, a diagnostic knowledge base for that device can be developed easily.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The project is a significant part of Hawthorne Army Ammunition Depot`s effort to achieve a 20-percent reduction in energy consumption by FY2000 versus FY1985 baseline levels. The project will also assure that heating services are provided to Industrial Area facilities on a continuing basis, supporting mission requirements.
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current
Code of Federal Regulations, 2011 CFR
2011-10-01
... activities necessary for implementing the replacement facilities, including engineering and cost analysis of... negotiations,” as that term is used in § 101.73 of this chapter. If these parties are unable to reach a... reach a negotiated agreement. As described elsewhere in this paragraph (f), MSS Licensees are obligated...
Mission Peculiar Equipment (MPE) For Spacelab Mission 1 Payload
NASA Astrophysics Data System (ADS)
Sims, John H.; Dodeck, Hauke
1982-02-01
Spacelab interfaces and services for payloads are advertised in the Spacelab Payload Accommodations Handbook (SPAH). These accommodations are available to the total payload and must be managed and apportioned by a payload integrator. A major part of the integration task is satisfying all instruments/facilities servicing requirements which vary with each item of payload equipment and, when totalled, sometimes exceed the capabilities as defined in SPAH. Such a determination is an output of the integrated payload design and integration effort which consists of analytical assessments based on individual payload equipment requirements inputs, STS and Spacelab available accommodations and constraints, and programmatic considerations. This systems engineering activity spans all engineering disciplines, assesses the module and pallet layouts and simultaneous operation of instrument/facility combinations, and requires a detailed knowledge of the Spacelab design. Introduction of a broad range of payload integrator-provided Mission Peculiar Equipment (MPE) into the Spacelab Mission 1 payload complement was necessary to be added to the Spacelab provisions in order to satisfy the interface and service requirements for each payload developer. This paper provides insight into various aspects of this MPE; including why it is needed, driving design considerations, design and development problems, and conclusions and recommendations for the future. MPE identified for Spacelab Mission 1 begins an inventory that will continue to expand as other mission requirements are identified and the Spacelab flight frequency increases.
Alleviation of Facility/Engine Interactions in an Open-Jet Scramjet Test Facility
NASA Technical Reports Server (NTRS)
Albertson, Cindy W.; Emami, Saied
2001-01-01
Results of a series of shakedown tests to eliminate facility/engine interactions in an open-jet scramjet test facility are presented. The tests were conducted with the NASA DFX (Dual-Fuel eXperimental scramjet) engine in the NASA Langley Combustion Heated Scramjet Test Facility (CHSTF) in support of the Hyper-X program, The majority of the tests were conducted at a total enthalpy and pressure corresponding to Mach 5 flight at a dynamic pressure of 734 psf. The DFX is the largest engine ever tested in the CHSTF. Blockage, in terms of the projected engine area relative to the nozzle exit area, is 81% with the engine forebody leading edge aligned with the upper edge of the facility nozzle such that it ingests the nozzle boundary layer. The blockage increases to 95% with the engine forebody leading edge positioned 2 in. down in the core flow. Previous engines successfully tested in the CHSTF have had blockages of no more than 51%. Oil flow studies along with facility and engine pressure measurements were used to define flow behavior. These results guided modifications to existing aeroappliances and the design of new aeroappliances. These changes allowed fueled tests to be conducted without facility interaction effects in the data with the engine forebody leading edge positioned to ingest the facility nozzle boundary layer. Interaction effects were also reduced for tests with the engine forebody leading edge positioned 2 in. into the core flow, however some interaction effects were still evident in the engine data. A new shroud and diffuser have been designed with the goal of allowing fueled tests to be conducted with the engine forebody leading edge positioned in the core without facility interaction effects in the data. Evaluation tests of the new shroud and diffuser will be conducted once ongoing fueled engine tests have been completed.
Testing of electrical equipment for a commercial grade dedication program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, J.L.; Srinivas, N.
1995-10-01
The availability of qualified safety related replacement parts for use in nuclear power plants has decreased over time. This has caused many nuclear power plants to purchase commercial grade items (CGI) and utilize the commercial grade dedication process to qualify the items for use in nuclear safety related applications. The laboratories of Technical and Engineering Services (the testing facility of Detroit Edison) have been providing testing services for verification of critical characteristics of these items. This paper presents an overview of the experience in testing electrical equipment with an emphasis on fuses.
Focus on: Washington Hospital Center, Biomedical Engineering Department.
Hughes, J D
1995-01-01
The Biomedical Engineering Department of the Washington Hospital Center provides clinical engineering services to an urban 907-bed, tertiary care teaching hospital and a variety of associated healthcare facilities. With an annual budget of over $3,000,000, the 24-person department provides cradle-to-grave support for a host of sophisticated medical devices and imaging systems such as lasers, CT scanners, and linear accelerators as well as traditional patient care instrumentation. Hallmarks of the department include its commitment to customer service and patient care, close collaboration with clinicians and quality assurance teams throughout the hospital system, proactive involvement in all phases of the technology management process, and shared leadership in safety standards with the hospital's risk management group. Through this interactive process, the department has assisted the Center not only in the acquisition of 11,000 active devices with a value of more than $64 million, but also in becoming one of the leading providers of high technology healthcare in the Washington, DC metropolitan area.
Charter for Systems Engineer Working Group
NASA Technical Reports Server (NTRS)
Suffredini, Michael T.; Grissom, Larry
2015-01-01
This charter establishes the International Space Station Program (ISSP) Mobile Servicing System (MSS) Systems Engineering Working Group (SEWG). The MSS SEWG is established to provide a mechanism for Systems Engineering for the end-to-end MSS function. The MSS end-to-end function includes the Space Station Remote Manipulator System (SSRMS), the Mobile Remote Servicer (MRS) Base System (MBS), Robotic Work Station (RWS), Special Purpose Dexterous Manipulator (SPDM), Video Signal Converters (VSC), and Operations Control Software (OCS), the Mobile Transporter (MT), and by interfaces between and among these elements, and United States On-Orbit Segment (USOS) distributed systems, and other International Space Station Elements and Payloads, (including the Power Data Grapple Fixtures (PDGFs), MSS Capture Attach System (MCAS) and the Mobile Transporter Capture Latch (MTCL)). This end-to-end function will be supported by the ISS and MSS ground segment facilities. This charter defines the scope and limits of the program authority and document control that is delegated to the SEWG and it also identifies the panel core membership and specific operating policies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, J.S.
Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less
NASA Astrophysics Data System (ADS)
Timm, S.; Cooper, G.; Fuess, S.; Garzoglio, G.; Holzman, B.; Kennedy, R.; Grassano, D.; Tiradani, A.; Krishnamurthy, R.; Vinayagam, S.; Raicu, I.; Wu, H.; Ren, S.; Noh, S.-Y.
2017-10-01
The Fermilab HEPCloud Facility Project has as its goal to extend the current Fermilab facility interface to provide transparent access to disparate resources including commercial and community clouds, grid federations, and HPC centers. This facility enables experiments to perform the full spectrum of computing tasks, including data-intensive simulation and reconstruction. We have evaluated the use of the commercial cloud to provide elasticity to respond to peaks of demand without overprovisioning local resources. Full scale data-intensive workflows have been successfully completed on Amazon Web Services for two High Energy Physics Experiments, CMS and NOνA, at the scale of 58000 simultaneous cores. This paper describes the significant improvements that were made to the virtual machine provisioning system, code caching system, and data movement system to accomplish this work. The virtual image provisioning and contextualization service was extended to multiple AWS regions, and to support experiment-specific data configurations. A prototype Decision Engine was written to determine the optimal availability zone and instance type to run on, minimizing cost and job interruptions. We have deployed a scalable on-demand caching service to deliver code and database information to jobs running on the commercial cloud. It uses the frontiersquid server and CERN VM File System (CVMFS) clients on EC2 instances and utilizes various services provided by AWS to build the infrastructure (stack). We discuss the architecture and load testing benchmarks on the squid servers. We also describe various approaches that were evaluated to transport experimental data to and from the cloud, and the optimal solutions that were used for the bulk of the data transport. Finally, we summarize lessons learned from this scale test, and our future plans to expand and improve the Fermilab HEP Cloud Facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Timm, S.; Cooper, G.; Fuess, S.
The Fermilab HEPCloud Facility Project has as its goal to extend the current Fermilab facility interface to provide transparent access to disparate resources including commercial and community clouds, grid federations, and HPC centers. This facility enables experiments to perform the full spectrum of computing tasks, including data-intensive simulation and reconstruction. We have evaluated the use of the commercial cloud to provide elasticity to respond to peaks of demand without overprovisioning local resources. Full scale data-intensive workflows have been successfully completed on Amazon Web Services for two High Energy Physics Experiments, CMS and NOνA, at the scale of 58000 simultaneous cores.more » This paper describes the significant improvements that were made to the virtual machine provisioning system, code caching system, and data movement system to accomplish this work. The virtual image provisioning and contextualization service was extended to multiple AWS regions, and to support experiment-specific data configurations. A prototype Decision Engine was written to determine the optimal availability zone and instance type to run on, minimizing cost and job interruptions. We have deployed a scalable on-demand caching service to deliver code and database information to jobs running on the commercial cloud. It uses the frontiersquid server and CERN VM File System (CVMFS) clients on EC2 instances and utilizes various services provided by AWS to build the infrastructure (stack). We discuss the architecture and load testing benchmarks on the squid servers. We also describe various approaches that were evaluated to transport experimental data to and from the cloud, and the optimal solutions that were used for the bulk of the data transport. Finally, we summarize lessons learned from this scale test, and our future plans to expand and improve the Fermilab HEP Cloud Facility.« less
NASA Technical Reports Server (NTRS)
Evans, Richard K.; Hill, Gerald M.
2012-01-01
Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world?s largest space environment test facilities located at the NASA Glenn Research Center?s Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.
NASA Technical Reports Server (NTRS)
Evans, Richard K.; Hill, Gerald M.
2014-01-01
Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world's largest space environment test facilities located at the NASA Glenn Research Center's Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.
2012-07-09
CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis
2012-07-09
CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis
Orion Service Module Umbilical (OSMU) Testing Complete
2016-10-19
Testing of the Orion Service Module Umbilical (OSMU) was completed at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. The OSMU was attached to Vehicle Motion Simulator 1 for a series of simulated launch tests to validate it for installation on the mobile launcher. Patrick Simpkins, director of Engineering, speaks to the test team during an event to mark the end of testing. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. Kennedy's Engineering Directorate is providing support to the Ground Systems Development and Operations Program for testing of the OSMU. EM-1 is scheduled to launch in 2018.
Apollo experience report: Engineering and analysis mission support
NASA Technical Reports Server (NTRS)
Fricke, R. W., Jr.
1975-01-01
The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.
Fractographic Analysis of High-Cycle Fatgue in Aircraft Engines
2000-01-01
and indicated its variation with crack growth distance. 14. SUBJECT TERMS Fractography Failure Analysis Fourier Fracture Surface High-Cycle...hosted a two-day meeting of the project team at their West Palm Beach facility in which they described how they used fractography and discussed their...that failed in service, and very valuable technical advice throughout this program. IX INTRODUCTION Fractography , the art of interpreting markings
An engine awaits processing in the new engine shop at KSC
NASA Technical Reports Server (NTRS)
1998-01-01
A new Block 2A engine awaits processing in the low bay of the Space Shuttle Main Engine Processing Facility (SSMEPF). Officially opened on July 6, the new facility replaces the Shuttle Main Engine Shop. The SSMEPF is an addition to the existing Orbiter Processing Facility Bay 3. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998.
Small engine components test facility compressor testing cell at NASA Lewis Research Center
NASA Technical Reports Server (NTRS)
Brokopp, Richard A.; Gronski, Robert S.
1992-01-01
LeRC has designed and constructed a new test facility. This facility, called the Small Engine Components Facility (SECTF) is used to test gas turbines and compressors at conditions similar to actual engine conditions. The SECTF is comprised of a compressor testing cell and a turbine testing cell. Only the compressor testing cell is described. The capability of the facility, the overall facility design, the instrumentation used in the facility, and the data acquisition system are discussed in detail.
Do you think you have what it takes to set up a long-term video monitoring unit?
Smith, Sheila L
2006-03-01
The single most important factor when setting up a long-term video monitoring unit is research. Research all vendors by traveling to other sites and calling other facilities. Considerations with equipment include the server, acquisition units, review units, cameras, software, and monitors as well as other factors including Health Insurance Portability and Accountability Act (HIPAA) compliance. Research customer support including both field and telephone support. Involve your Clinical Engineering Department in your investigations. Be sure to obtain warranty information. Researching placement of the equipment is essential. Communication with numerous groups is vital. Administration, engineers, clinical engineering, physicians, infection control, environmental services, house supervisors, security, and all involved parties should be involved in the planning.
2015-01-13
CAPE CANAVERAL, Fla. -- Workers take photographs of NASA's Orion spacecraft during a viewing at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2015-01-13
CAPE CANAVERAL, Fla. -- Workers take photographs of NASA's Orion spacecraft during a viewing at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2015-01-13
CAPE CANAVERAL, Fla. -- Workers take photographs of NASA's Orion spacecraft during a viewing at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2015-01-13
CAPE CANAVERAL, Fla. -- Workers take photographs of NASA's Orion spacecraft during a viewing at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2015-01-13
CAPE CANAVERAL, Fla. -- Workers take photographs of NASA's Orion spacecraft during a viewing at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
Hoffman, P; Kline, E; George, L; Price, K; Clark, M; Walasin, R
1995-01-01
The Military Health Service System (MHSS) provides health care for the Department of Defense (DOD). This system operates on an annual budget of $15 Billion, supports 127 medical treatment facilities (MTFs) and 500 clinics, and provides support to 8.7 million beneficiaries worldwide. To support these facilities and their patients, the MHSS uses more than 125 different networked automated medical systems. These systems rely on a heterogeneous telecommunications infrastructure for data communications. With the support of the Defense Medical Information Management (DMIM) Program Office, our goal was to identify the network requirements for DMIM migration and target systems and design a communications infrastructure to support all systems with an integrated network. This work used tools from Business Process Reengineering (BPR) and applied it to communications infrastructure design for the first time. The methodology and results are applicable to any health care enterprise, military or civilian.
Hoffman, P.; Kline, E.; George, L.; Price, K.; Clark, M.; Walasin, R.
1995-01-01
The Military Health Service System (MHSS) provides health care for the Department of Defense (DOD). This system operates on an annual budget of $15 Billion, supports 127 medical treatment facilities (MTFs) and 500 clinics, and provides support to 8.7 million beneficiaries worldwide. To support these facilities and their patients, the MHSS uses more than 125 different networked automated medical systems. These systems rely on a heterogeneous telecommunications infrastructure for data communications. With the support of the Defense Medical Information Management (DMIM) Program Office, our goal was to identify the network requirements for DMIM migration and target systems and design a communications infrastructure to support all systems with an integrated network. This work used tools from Business Process Reengineering (BPR) and applied it to communications infrastructure design for the first time. The methodology and results are applicable to any health care enterprise, military or civilian. PMID:8563346
This photographic copy of an engineering drawing shows floor plans, ...
This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA
List of DOE radioisotope customers with summary of radioisotope shipments, FY 1980
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burlison, J.S.
1981-08-01
The sixteenth edition of the radioisotope customer list was prepared at the request of the Office of Health and Environmental Research, Office of energy Research, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory; Pacific Northwest Laboratory; Brookhaven National Laboraory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: (1) isotope suppliers, facility, contracts and isotopes or services supplied; (2) alphabetical list of customers, and isotopesmore » purchased; (3) alphabetical list of isotopes cross-referenced to customer numbers; (4) geographical location of radioisotope customers; and (5) radioisotope sales and transfers-FY 1980.« less
List of DOE radioisotope customers with summary of radioisotope shipments, FY 1981
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burlison, J.S.
1982-09-01
The seventeenth edition of the radioisotope customer list was prepared at the request of the Office of Health and Environmental Research, Office of Energy Research, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory: Pacific Northwest Laboratory; Brookhaven National Laboratory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: (1) isotope suppliers, facility, contracts and isotopes or services supplied; (2) alphabetical list of customers, and isotopesmore » purchased; (3) alphabetical list of isotopes cross-referenced to customer numbers; (4) geographical location of radioisotope customers; and (5) radioisotope sales and transfers-FY 1980.« less
7. Historic aerial photo of rocket engine test facility complex, ...
7. Historic aerial photo of rocket engine test facility complex, June 1962. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-60674. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
1981-07-01
CONTRACT OR GRANT NUMBER(e) Naval Facilities Engineering Command 200 Stovall Street r Alexandria, VA 22332 (Code 0453) s. PERFORMING ORGANIZATION NAME...AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK • Naval Facilities Engineering Command AREA & WORK UNIT NUMBERS < 200 Stovall Street Engineering and...Design Alexandria, VA 22332 It. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE ~ Naval Facilities Engineering Command (Code10432) July 1981 200
2013-11-06
CAPE CANAVERAL, Fla. – Engineers and technicians move NASA's MAVEN spacecraft, inside payload fairing inside the Payload Hazardous Servicing Facility, or PHSF, into the airlock for mounting to a trailer for transport to Space Launch Complex 41 where it will be hoisted atop a United Launch Alliance Atlas V rocket that will lift it into space and on to Mars. MAVEN is short for Mars Atmosphere and Volatile Evolution. Photo credit: NASA/Kim Shiflett
2013-11-06
CAPE CANAVERAL, Fla. – Engineers and technicians move NASA's MAVEN spacecraft, inside payload fairing inside the Payload Hazardous Servicing Facility, or PHSF, into the airlock for mounting to a trailer for transport to Space Launch Complex 41 where it will be hoisted atop a United Launch Alliance Atlas V rocket that will lift it into space and on to Mars. MAVEN is short for Mars Atmosphere and Volatile Evolution. Photo credit: NASA/Kim Shiflett
2013-11-06
CAPE CANAVERAL, Fla. – Engineers and technicians move NASA's MAVEN spacecraft, inside payload fairing inside the Payload Hazardous Servicing Facility, or PHSF, into the airlock for mounting to a trailer for transport to Space Launch Complex 41 where it will be hoisted atop a United Launch Alliance Atlas V rocket that will lift it into space and on to Mars. MAVEN is short for Mars Atmosphere and Volatile Evolution. Photo credit: NASA/Kim Shiflett
2013-11-06
CAPE CANAVERAL, Fla. – Engineers and technicians move NASA's MAVEN spacecraft, inside payload fairing inside the Payload Hazardous Servicing Facility, or PHSF, into the airlock for mounting to a trailer for transport to Space Launch Complex 41 where it will be hoisted atop a United Launch Alliance Atlas V rocket that will lift it into space and on to Mars. MAVEN is short for Mars Atmosphere and Volatile Evolution. Photo credit: NASA/Kim Shiflett
Stennis Space Center observes Disability Awareness Day
2009-10-15
Members of STARC, a non-profit organization in Slidell, La., that seeks to help people with disabilities lead meaningful, productive lives, pose with their appreciation awards during Disability Awareness Day at Stennis Space Center on Oct. 15. The group members received appreciation awards for their dedicated service to the rocket engine testing facility. Disability Awareness Day was hosted by the Stennis Diversity Council and included guest speakers from several area agencies.
Stennis Space Center observes Disability Awareness Day
NASA Technical Reports Server (NTRS)
2009-01-01
Members of STARC, a non-profit organization in Slidell, La., that seeks to help people with disabilities lead meaningful, productive lives, pose with their appreciation awards during Disability Awareness Day at Stennis Space Center on Oct. 15. The group members received appreciation awards for their dedicated service to the rocket engine testing facility. Disability Awareness Day was hosted by the Stennis Diversity Council and included guest speakers from several area agencies.
NASA Technical Reports Server (NTRS)
2007-01-01
A vintage 1960 J-2 thrust chamber is fitted with brackets and pumps recently at the Pratt & Whitney Rocketdyne assembly facility in Stennis Space Center's Building 9101. Together, the parts comprise the J-2X Powerpack 1A test article. Mississippi Space Services machined the new bracket (the V-shaped arm on the right), making this the first time parts for an engine test article were machined, welded and assembled on site at SSC.
2007-04-11
A vintage 1960 J-2 thrust chamber is fitted with brackets and pumps recently at the Pratt & Whitney Rocketdyne assembly facility in Stennis Space Center's Building 9101. Together, the parts comprise the J-2X Powerpack 1A test article. Mississippi Space Services machined the new bracket (the V-shaped arm on the right), making this the first time parts for an engine test article were machined, welded and assembled on site at SSC.
9. Historic aerial photo of rocket engine test facility complex, ...
9. Historic aerial photo of rocket engine test facility complex, June 11, 1965. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-65-1270. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
10. Historic photo of rendering of rocket engine test facility ...
10. Historic photo of rendering of rocket engine test facility complex, April 28, 1964. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-69472. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
8. Historic aerial photo of rocket engine test facility complex, ...
8. Historic aerial photo of rocket engine test facility complex, June 11, 1965. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-65-1271. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Facilities | Argonne National Laboratory
Skip to main content Argonne National Laboratory Toggle Navigation Toggle Search Research Facilities Advanced Powertrain Research Facility Center for Transportation Research Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Materials Engineering Research Facility
Facility design, construction, and operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less
6. Historic photo of rocket engine test facility Building 202 ...
6. Historic photo of rocket engine test facility Building 202 complex in operation at night, September 12, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45924. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
13. Historic drawing of rocket engine test facility layout, including ...
13. Historic drawing of rocket engine test facility layout, including Buildings 202, 205, 206, and 206A, February 3, 1984. NASA GRC drawing number CF-101539. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility services...
NASA Astrophysics Data System (ADS)
Akers, James C.; Passe, Paul J.; Cooper, Beth A.
2005-09-01
The Acoustical Testing Laboratory (ATL) at the NASA John H. Glenn Research Center (GRC) in Cleveland, OH, provides acoustic emission testing and noise control engineering services for a variety of specialized customers, particularly developers of equipment and science experiments manifested for NASA's manned space missions. The ATL's primary customer has been the Fluids and Combustion Facility (FCF), a multirack microgravity research facility being developed at GRC for the USA Laboratory Module of the International Space Station (ISS). Since opening in September 2000, ATL has conducted acoustic emission testing of components, subassemblies, and partially populated FCF engineering model racks. The culmination of this effort has been the acoustic emission verification tests on the FCF Combustion Integrated Rack (CIR) and Fluids Integrated Rack (FIR), employing a procedure that incorporates ISO 11201 (``Acoustics-Noise emitted by machinery and equipment-Measurement of emission sound pressure levels at a work station and at other specified positions-Engineering method in an essentially free field over a reflecting plane''). This paper will provide an overview of the test methodology, software, and hardware developed to perform the acoustic emission verification tests on the CIR and FIR flight racks and lessons learned from these tests.
NASA Technical Reports Server (NTRS)
Ray, Charles D.; Perry, Jay L.; Callahan, David M.
2000-01-01
As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.
Home page of Arnold Air Force Base
time to reflect on the men and women who have gi... Facebook Logo Free-jet engine test at AEDC facility record for free-jet mode engines by achieving transonic speeds! @AEDCnews https://t.co/6lD4T5bnte Free-jet engine test at AEDC facility sets record Free-jet engine test at AEDC facility sets record
Test Stand at the Rocket Engine Test Facility
1973-02-21
The thrust stand in the Rocket Engine Test Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center in Cleveland, Ohio. The Rocket Engine Test Facility was constructed in the mid-1950s to expand upon the smaller test cells built a decade before at the Rocket Laboratory. The $2.5-million Rocket Engine Test Facility could test larger hydrogen-fluorine and hydrogen-oxygen rocket thrust chambers with thrust levels up to 20,000 pounds. Test Stand A, seen in this photograph, was designed to fire vertically mounted rocket engines downward. The exhaust passed through an exhaust gas scrubber and muffler before being vented into the atmosphere. Lewis researchers in the early 1970s used the Rocket Engine Test Facility to perform basic research that could be utilized by designers of the Space Shuttle Main Engines. A new electronic ignition system and timer were installed at the facility for these tests. Lewis researchers demonstrated the benefits of ceramic thermal coatings for the engine’s thrust chamber and determined the optimal composite material for the coatings. They compared the thermal-coated thrust chamber to traditional unlined high-temperature thrust chambers. There were more than 17,000 different configurations tested on this stand between 1973 and 1976. The Rocket Engine Test Facility was later designated a National Historic Landmark for its role in the development of liquid hydrogen as a propellant.
NASA Technical Reports Server (NTRS)
1977-01-01
In the sixties, Chrysler was NASA's prime contractor for the Saturn I and IB test launch vehicles. The company installed and operated at Huntsville what was known as the Saturn I/IB Development Breadboard Facility. "Breadboard," means an array of electrical and electronic equipment for performing a variety of development and test functions. This work gave Chrysler a broad capability in computerized testing to assure quality control in development of solid-state electronic systems. Today that division is manufacturing many products not destined for NASA, most of them being associated with the company's automotive line. A major project is production and quality-control testing of the "lean-burn" engine, one that has a built-in Computer to control emission timing, and allow the engine to run on a leaner mixture of fuel and air. Other environment-related products include vehicle emission analyzers. The newest of the line is an accurate, portable solid state instrument for testing auto exhaust gases. The exhaust analyzers, now being produced for company dealers and for service
Closeup view of the aft fuselage of the Orbiter Discovery ...
Close-up view of the aft fuselage of the Orbiter Discovery looking at the thrust structure that supports the Space Shuttle Main Engines (SSMEs). In this view, SSME number two position is on the left and SSME number three position is on the right. The thrust structure transfers the forces produce by the engines into and through the airframe of the orbiter. The thrust structure includes the SSMEs load reaction truss structure, engine interface fittings and the hydraulic-actuator support structure. The propellant feed lines are the plugged and capped orifices within the engine bays. Note that SSME position two is rotated ninety degrees from position three and one. This was needed to enable enough clearance for the engines to fit and gimbal. Note in engine bay three is a clear view of the actuators that control the gambling of that engine. This view was taken from a service platform in the Orbiter Processing Facility at Kennedy Space Center. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Northeast Oregon Hatchery Project, Final Siting Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watson, Montgomery
1995-03-01
This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less
2009-01-13
Stennis Space Center Director Gene Goldman (center) stands with astronauts Christopher Ferguson (right) and Heidemarie Stefanyshyn-Piper in front of the A-2 Test Stand during the space shuttle crew members' visit to NASA's rocket engine testing facility Jan. 13. During their visit, Ferguson and Stefanyshyn-Piper reported on the STS-126 space shuttle delivery and servicing mission to the International Space Station. Ferguson served as commander of the mission. Stefanyshyn-Piper served as a mission specialist.
1994-12-01
additional assistance when needed. Captain Morgan’s assistance was especially appreciated since he came to the team while he was still a graduate student ...business practices. One of the primary areas targeted for study are the registrar/ student records departments (Moore, 1993:8-9). While investigating...The service academy portion was broken into segments: financial management, admissions, registrar/ student records, development/alumni and facilities
2013-11-06
CAPE CANAVERAL, Fla. – Engineers and technicians get ready to move NASA's MAVEN spacecraft, inside payload fairing inside the Payload Hazardous Servicing Facility, or PHSF, into the airlock for mounting to a trailer for transport to Space Launch Complex 41 where it will be hoisted atop a United Launch Alliance Atlas V rocket that will lift it into space and on to Mars. MAVEN is short for Mars Atmosphere and Volatile Evolution. Photo credit: NASA/Kim Shiflett
2006-12-01
Antecedents and Consequences of Failed Governance : the Enron Example. Corporate Governance , 5: 5. Garrett, G., & Rendon, R. 2005(a). Contract Management... government organization because NAVFAC faces competition analogous to the corporate world. If NAVFAC fails to provide adequate services, the ...applicable to NAVFAC even though NAVFAC is a government organization because NAVFAC faces competition analogous to the corporate world. If NAVFAC fails to
NASA Technical Reports Server (NTRS)
2009-01-01
Stennis Space Center Director Gene Goldman (center) stands with astronauts Christopher Ferguson (right) and Heidemarie Stefanyshyn-Piper in front of the A-2 Test Stand during the space shuttle crew members' visit to NASA's rocket engine testing facility Jan. 13. During their visit, Ferguson and Stefanyshyn-Piper reported on the STS-126 space shuttle delivery and servicing mission to the International Space Station. Ferguson served as commander of the mission. Stefanyshyn-Piper served as a mission specialist.
2012-09-01
analysis of CSF survey results conducted to test for similarities amongst the different contracting agencies. This analysis will help further the academic...acquisition; test and evaluation; training facilities and equipment; repair and modification; and in-service engineering and logistics support (NAVAIR...138 253,191,378.22 HONEYWELL INTERNATIONAL INC. 1,240 248,606,761.32 SCIENTIFIC RESEARCH CORP 945 242,823,383.93 HENSEL PHELPS CONSTRUCTION CO 65
2017-10-25
Anuj Chokshi of FPL, center, speaks during the Energy Action Day employee event held in NASA Kennedy Space Center's Space Station Processing Facility. Part of Energy Awareness Month, the event featured subject matter experts in the area of solar energy, its connections to the space program and options for residential solar power. From left to right are Chuck Tatro of NASA's Launch Services Program; Sam Ball of NASA Kennedy's Engineering directorate; Chokshi; and Bill McMullen of Southern Power.
An integrated approach to infrastructure.
Hayes, Stewart
2010-02-01
In an edited version of a paper presented at the IHEA (Institute of Hospital Engineering Australia) 60th National Conference 2009, Stewart Hayes, principal consultant at Jakeman Business Solutions, argues that, with "traditional" means of purchasing and maintaining critical hospital infrastructure systems "becoming less viable", a more integrated, strategic approach to procuring and providing essential hospital services that looks not just to the present, but equally to the facility's anticipated future needs, is becoming ever more important.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Satogata, Todd
2013-04-22
The integrated control system (ICS) is responsible for the whole ESS machine and facility: accelerator, target, neutron scattering instruments and conventional facilities. This unified approach keeps the costs of development, maintenance and support relatively low. ESS has selected a standardised, field-proven controls framework, the Experimental Physics and Industrial Control System (EPICS), which was originally developed jointly by Argonne and Los Alamos National Laboratories. Complementing this selection are best practices and experience from similar facilities regarding platform standardisation, control system development and device integration and commissioning. The components of ICS include the control system core, the control boxes, the BLED databasemore » management system, and the human machine interface. The control system core is a set of systems and tools that make it possible for the control system to provide required data, information and services to engineers, operators, physicists and the facility itself. The core components are the timing system that makes possible clock synchronisation across the facility, the machine protection system (MPS) and the personnel protection system (PPS) that prevent damage to the machine and personnel, and a set of control system services. Control boxes are servers that control a collection of equipment (for example a radio frequency cavity). The integrated control system will include many control boxes that can be assigned to one supplier, such as an internal team, a collaborating institute or a commercial vendor. This approach facilitates a clear division of responsibilities and makes integration much easier. A control box is composed of a standardised hardware platform, components, development tools and services. On the top level, it interfaces with the core control system components (timing, MPS, PPS) and with the human-machine interface. At the bottom, it interfaces with the equipment and parts of the facility through a set of analog and digital signals, real-time control loops and other communication buses. The ICS central data management system is named BLED (beam line element databases). BLED is a set of databases, tools and services that is used to store, manage and access data. It holds vital control system configuration and physics-related (lattice) information about the accelerator, target and instruments. It facilitates control system configuration by bringing together direct input-output controller (IOC) con guration and real-time data from proton and neutron beam line models. BLED also simplifies development and speeds up the code-test-debug cycle. The set of tools that access BLED will be tailored to the needs of different categories of users, such as ESS staff physicists, engineers, and operators; external partner laboratories; and visiting experimental instrument users. The human-machine interface is vital to providing a high-quality experience to ICS users. It encompasses a wide array of devices and software tools, from control room screens to engineer terminal windows; from beam physics data tools to post-mortem data analysis tools. It serves users with a wide range of skills from widely varied backgrounds. The Controls Group is developing a set of user profiles to accommodate this diverse range of use-cases and users.« less
A Rainbow View of NASA's RS-25 Engine Test
2017-02-22
NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov
1998-07-06
James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998
The SSMEPF opens with a ribbon-cutting ceremony
NASA Technical Reports Server (NTRS)
1998-01-01
James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false Inpatient hospital services, nursing facility... Definitions § 440.140 Inpatient hospital services, nursing facility services, and intermediate care facility... under section 1903(i)(4) of the Act and subpart H of part 456 of this chapter. (b) Nursing facility...
2015-01-13
CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is positioned inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida in preparation for a viewing by Kennedy workers. Orion's back shell panels have been removed. The spacecraft completed the first flight test in December, was retrieved from the Pacific Ocean, and transported 2,700 miles overland to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. Orion will be transported to the Payload Hazardous Servicing Facility for deservicing. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vanvick, T.W.
The Logan Generating Plant (formerly Keystone Cogeneration Project) is a 230 MW (gross) pulverized coal cogeneration facility located on the Delaware River in Logan Township, New Jersey, off Route 130. Owned and operated by U.S. Generating Company, the plant was built by Bechtel Corporation, which provided engineering, procurement, construction, and startup services. Power from the plant is furnished to Atlantic Electric, and approximately 50,000 pounds of process steam per hour is provided to Monsanto`s adjacent facility. U.S. Generating Company is committed to operating plants with close attention to the environment and has developed a specific Environmental Mission Statement. This papermore » addresses some of the key environmental features at the Logan Generating Plant.« less
Facilities Engineering in NASA
NASA Technical Reports Server (NTRS)
Pagluiso, M. A.
1970-01-01
An overview of NASA facilities is given outlining some of the more interesting and unique aspects of engineering and facilities associated with the space program. Outlined are some of the policies under which the Office of Facilities conducts its business. Included are environmental quality control measures.
7. This photographic copy of an engineering drawing displays the ...
7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
4. This photographic copy of an engineering drawing shows the ...
4. This photographic copy of an engineering drawing shows the plan and details for Test Stand "G" and the placement of the vibrator. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: "Vibration Test Facility-Bldg E-72, Floor & Roof Plans, Sections, Details & Door Schedule," drawing no. E72/2-5, 21 May 1964. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Test Stand G, Edwards Air Force Base, Boron, Kern County, CA
A free-piston Stirling engine/linear alternator controls and load interaction test facility
NASA Technical Reports Server (NTRS)
Rauch, Jeffrey S.; Kankam, M. David; Santiago, Walter; Madi, Frank J.
1992-01-01
A test facility at LeRC was assembled for evaluating free-piston Stirling engine/linear alternator control options, and interaction with various electrical loads. This facility is based on a 'SPIKE' engine/alternator. The engine/alternator, a multi-purpose load system, a digital computer based load and facility control, and a data acquisition system with both steady-periodic and transient capability are described. Preliminary steady-periodic results are included for several operating modes of a digital AC parasitic load control. Preliminary results on the transient response to switching a resistive AC user load are discussed.
Structural dynamics verification facility study
NASA Technical Reports Server (NTRS)
Kiraly, L. J.; Hirchbein, M. S.; Mcaleese, J. M.; Fleming, D. P.
1981-01-01
The need for a structural dynamics verification facility to support structures programs was studied. Most of the industry operated facilities are used for highly focused research, component development, and problem solving, and are not used for the generic understanding of the coupled dynamic response of major engine subsystems. Capabilities for the proposed facility include: the ability to both excite and measure coupled structural dynamic response of elastic blades on elastic shafting, the mechanical simulation of various dynamical loadings representative of those seen in operating engines, and the measurement of engine dynamic deflections and interface forces caused by alternative engine mounting configurations and compliances.
Rayleigh Scattering for Measuring Flow in a Nozzle Testing Facility
NASA Technical Reports Server (NTRS)
Gomez, Carlos R.; Panda, Jayanta
2006-01-01
A molecular Rayleigh-scattering-based air-density measurement system was built in a large nozzle-and-engine-component test facility for surveying supersonic plumes from jet-engine exhaust. A molecular Rayleigh-scattering-based air-density measurement system was built in a large nozzle-and-enginecomponent test facility for surveying supersonic plumes from jet-engine exhaust
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
2006-02-01
Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A
Designing an Alternate Mission Operations Control Room
NASA Technical Reports Server (NTRS)
Montgomery, Patty; Reeves, A. Scott
2014-01-01
The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.
This photocopy of an engineering drawing shows the floor plan ...
This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA
NASA Lewis Wind Tunnel Model Systems Criteria
NASA Technical Reports Server (NTRS)
Soeder, Ronald H.; Haller, Henry C.
1994-01-01
This report describes criteria for the design, analysis, quality assurance, and documentation of models or test articles that are to be tested in the aeropropulsion facilities at the NASA Lewis Research Center. The report presents three methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it gives quality assurance criteria for models tested in Lewis' aeropropulsion facilities. Both customer-furnished model systems and in-house model systems are discussed. The functions of the facility manager, project engineer, operations engineer, research engineer, and facility electrical engineer are defined. The format for pretest meetings, prerun safety meetings, and the model criteria review are outlined Then, the format for the model systems report (a requirement for each model that is to be tested at NASA Lewis) is described, the engineers that are responsible for developing the model systems report are listed, and the time table for its delivery to the facility manager is given.
Installation Restoration Program. Phase 1. Records Search Wake Island Airfield
1984-09-01
serviced transient Air Force aircraft at Wake Island. Detachments of the 6486th Air Base Wing (predecessor organization *of the 15th Air Base Wing...following groups: " o Base Operations o Transportation Division o Civil Engineering Division . Air Force facilities were located east of the 1700...since these materials were shipped to the base on barges. The contrac- tors also took waste oil from the Air . Force for use in their vehicles and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lammert, M. P.; Walkowicz, K.; Duran, A.
2012-10-01
In-use and laboratory-derived fuel economies were analyzed for a medium-duty hybrid electric drivetrain with 'engine off at idle' capability and a conventional drivetrain in a typical commercial package delivery application. Vehicles studied included eleven 2010 Freightliner P100H hybrids in service at a United Parcel Service facility in Minneapolis during the first half of 2010. The hybrids were evaluated for 18 months against eleven 2010 Freightliner P100D diesels at the same facility. Both vehicle groups use the same 2009 Cummins ISB 200-HP engine. In-use fuel economy was evaluated using UPS's fueling and mileage records, periodic ECM image downloads, and J1939 CANmore » bus recordings during the periods of duty cycle study. Analysis of the in-use fuel economy showed 13%-29% hybrid advantage depending on measurement method, and a delivery route assignment analysis showed 13%-26% hybrid advantage on the less kinetically intense original diesel route assignments and 20%-33% hybrid advantage on the more kinetically intense original hybrid route assignments. Three standardized laboratory drive cycles were selected that encompassed the range of real-world in-use data. The hybrid vehicle demonstrated improvements in ton-mi./gal fuel economy of 39%, 45%, and 21% on the NYC Comp, HTUF Class 4, and CARB HHDDT test cycles, respectively.« less
Characteristics of U.S. Mental Health Facilities That Offer Suicide Prevention Services.
Kuramoto-Crawford, S Janet; Smith, Kelley E; McKeon, Richard
2016-01-01
This study characterized mental health facilities that offer suicide prevention services or outcome follow-up after discharge. The study analyzed data from 8,459 U.S. mental health facilities that participated in the 2010 National Mental Health Services Survey. Logistic regression analyses were used to compare facilities that offered neither of the prevention services with those that offered both or either service. About one-fifth of mental health facilities reported offering neither suicide prevention services nor outcome follow-up. Approximately one-third offered both, 25% offered suicide prevention services only, and 21% offered only outcome follow-up after discharge. Facilities that offered neither service were less likely than facilities that offered either to offer comprehensive support services or special programs for veterans; to offer substance abuse services; and to be accredited, licensed, or certified. Further examination of facilitators and barriers in implementing suicide prevention services in mental health facilities is warranted.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CIVIL AIRCRAFT § 766.8 Procedure for review, approval, execution and distribution of aviation facility... license and Certificate of Insurance to the Commander, Naval Facilities Engineering Command or his... Facilities Engineering Command or his designated representative. (1) Upon receipt, the Commander, Naval...
An IMS Station life cycle from a sustainment point of view
NASA Astrophysics Data System (ADS)
Brely, Natalie; Gautier, Jean-Pierre; Foster, Daniel
2014-05-01
The International Monitoring System (IMS) is to consist of 321 monitoring facilities, composed of four different technologies with a variety of designs and equipment types, deployed in a range of environments around the globe. The International Monitoring System is conceived to operate in perpetuity through maintenance, replacement and recapitalization of IMS facilities' infrastructure and equipment when the end of service life is reached [CTBT/PTS/INF.1163]. Life Cycle techniques and modellization are being used by the PTS to plan and forecast life cycle sustainment requirements of IMS facilities. Through historical data analysis, Engineering inputs and Feedback from experienced Station Operators, the PTS currently works towards increasing the level of confidence on these forecasts and sustainment requirements planning. Continued validation, feedback and improvement of source data from scientific community and experienced users is sought and essential in order to ensure limited effect on data availability and optimal costs (human and financial).
Fluids and Combustion Facility Acoustic Emissions Controlled by Aggressive Low-Noise Design Process
NASA Technical Reports Server (NTRS)
Cooper, Beth A.; Young, Judith A.
2004-01-01
The Fluids and Combustion Facility (FCF) is a dual-rack microgravity research facility that is being developed by Northrop Grumman Information Technology (NGIT) for the International Space Station (ISS) at the NASA Glenn Research Center. As an on-orbit test bed, FCF will host a succession of experiments in fluid and combustion physics. The Fluids Integrated Rack (FIR) and the Combustion Integrated Rack (CIR) must meet ISS acoustic emission requirements (ref. 1), which support speech communication and hearing-loss-prevention goals for ISS crew. To meet these requirements, the NGIT acoustics team implemented an aggressive low-noise design effort that incorporated frequent acoustic emission testing for all internal noise sources, larger-scale systems, and fully integrated racks (ref. 2). Glenn's Acoustical Testing Laboratory (ref. 3) provided acoustical testing services (see the following photograph) as well as specialized acoustical engineering support as part of the low-noise design process (ref. 4).
8. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...
8. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: SECTIONS AND DETAILS, 1971. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
7 CFR 1942.20 - Community Facility Guides.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (7) Guide 7—Preliminary Engineering Report Water Facility. (8) Guide 8—Preliminary Engineering Report Sewerage Systems. (9) Guide 9—Preliminary Engineering Report Solid Waste Disposal Systems. (10) Guide 10—Preliminary Engineering Report Storm Waste-Water Disposal. (11) Guide 11—Daily Inspection Report. (12) Guide...
Control Room at the NACA’s Rocket Engine Test Facility
1957-05-21
Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.
NASA Technical Reports Server (NTRS)
Hensarling, Paula L.
2007-01-01
The John C. Stennis Space Center (SSC) is located in Southern Mississippi near the Mississippi-Louisiana state line. SSC is chartered as the National Aeronautics and Space Administration (NASA) Center of Excellence for large space transportation propulsion system testing. This charter has led to many unique test facilities, capabilities and advanced technologies provided through the supporting infrastructure. SSC has conducted projects in support of such diverse activities as liquid, and hybrid rocket testing and development; material development; non-intrusive plume diagnostics; plume tracking; commercial remote sensing; test technology and more. On May 30, 1996 NASA designated SSC the lead center for rocket propulsion testing, giving the center total responsibility for conducting and/or managing all NASA rocket engine testing. Test services are now available not only for NASA but also for the Department of Defense, other government agencies, academia, and industry. This handbook was developed to provide a summary of the capabilities that exist within SSC. It is intended as a primary resource document, which will provide the reader with the top-level capabilities and characteristics of the numerous test facilities, test support facilities, laboratories, and services. Due to the nature of continually evolving programs and test technologies, descriptions of the Center's current capabilities are provided. Periodic updates and revisions of this document will be made to maintain its completeness and accuracy.
Measurement of Creep Properties of Ultra-High-Temperature Materials by a Novel Non-Contact Technique
NASA Technical Reports Server (NTRS)
Hyers, Robert W.; Lee, Jonghyun; Rogers, Jan R.; Liaw, Peter K.
2007-01-01
A non-contact technique for measuring the creep properties of materials has been developed and validated as part of a collaboration among the University of Massachusetts, NASA Marshall Space Flight Center Electrostatic Levitation Facility (ESL), and the University of Tennessee. This novel method has several advantages over conventional creep testing. The sample is deformed by the centripetal acceleration from the rapid rotation, and the deformed shapes are analyzed to determine the strain. Since there is no contact with grips, there is no theoretical maximum temperature and no concern about chemical compatibility. Materials may be tested at the service temperature even for extreme environments such as rocket nozzles, or above the service temperature for accelerated testing of materials for applications such as jet engines or turbopumps for liquid-fueled engines. The creep measurements have been demonstrated to 2400 C with niobium, while the test facility, the NASA MSFC ESL, has processed materials up to 3400 C. Furthermore, the ESL creep method employs a distribution of stress to determine the stress exponent from a single test, versus the many tests required by conventional methods. Determination of the stress exponent from the ESL creep tests requires very precise measurement of the surface shape of the deformed sample for comparison to deformations predicted by finite element models for different stress exponents. An error analysis shows that the stress exponent can be determined to about 1% accuracy with the current methods and apparatus. The creep properties of single-crystal niobium at 1985 C showed excellent agreement with conventional tests performed according to ASTM Standard E-139. Tests on other metals, ceramics, and composites relevant to rocket propulsion and turbine engines are underway.
Test results and facility description for a 40-kilowatt stirling engine
NASA Technical Reports Server (NTRS)
Kelm, G. G.; Cairelli, J. E.; Walter, R. J.
1981-01-01
A 40 kilowatt Stirling engine, its test support facilities, and the experimental procedures used for these tests are described. Operating experience with the engine is discussed, and some initial test results are presented
Providing security for automated process control systems at hydropower engineering facilities
NASA Astrophysics Data System (ADS)
Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.
2016-12-01
This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.
NREL. Steve has an extensive background in facilities engineering, facilities management, and Energy Manager, and a Project Management Professional. Prior to joining NREL, Steve was the Facilities manufacturing engineering, business application programming, and business process management positions
7. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...
7. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: ELEVATIONS, FLOOR AND FOUNDATION PLANS, 1971. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
2017-02-16
APEX-04, or Advanced Plant EXperiments-04, is being prepared in a cold room in the Kennedy Space Center Processing Facility for SpaceX-10. Shawn Stephens, Engineering Services Contract, and Dr. Anna Lisa Paul confirm proper orientation of the plates for launch prior to turnover to cold stowage. Dr. Paul of the University of Florida is the principal investigator for APEX-04. Apex-04 is an experiment involving Arabidopsis in petri plates inside the Veggie facility aboard the International Space Station. Since Arabidopsis is the genetic model of the plant world, it is a perfect sample organism for performing genetic studies in spaceflight. The experiment is the result of a grant from NASA’s Space Life and Physical Sciences division.
Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)
NASA Technical Reports Server (NTRS)
Stengle, Thomas; Hoge, Susan
2008-01-01
The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.
42 CFR 415.204 - Services of residents in skilled nursing facilities and home health agencies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 3 2013-10-01 2013-10-01 false Services of residents in skilled nursing facilities... SETTINGS Services of Residents § 415.204 Services of residents in skilled nursing facilities and home... nursing facility. Payment to a participating skilled nursing facility may include the cost of services of...
42 CFR 415.204 - Services of residents in skilled nursing facilities and home health agencies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 3 2012-10-01 2012-10-01 false Services of residents in skilled nursing facilities... SETTINGS Services of Residents § 415.204 Services of residents in skilled nursing facilities and home... nursing facility. Payment to a participating skilled nursing facility may include the cost of services of...
42 CFR 415.204 - Services of residents in skilled nursing facilities and home health agencies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 3 2014-10-01 2014-10-01 false Services of residents in skilled nursing facilities... SETTINGS Services of Residents § 415.204 Services of residents in skilled nursing facilities and home... nursing facility. Payment to a participating skilled nursing facility may include the cost of services of...
NASA Technical Reports Server (NTRS)
Melcher, John C., IV; Allred, Jennifer K.
2009-01-01
Tests were conducted with the RS18 rocket engine using liquid oxygen (LO2) and liquid methane (LCH4) propellants under simulated altitude conditions at NASA Johnson Space Center White Sands Test Facility (WSTF). This project is part of NASA s Propulsion and Cryogenics Advanced Development (PCAD) project. "Green" propellants, such as LO2/LCH4, offer savings in both performance and safety over equivalently sized hypergolic propellant systems in spacecraft applications such as ascent engines or service module engines. Altitude simulation was achieved using the WSTF Large Altitude Simulation System, which provided altitude conditions equivalent up to approx.120,000 ft (approx.37 km). For specific impulse calculations, engine thrust and propellant mass flow rates were measured. Propellant flow rate was measured using a coriolis-style mass-flow meter and compared with a serial turbine-style flow meter. Results showed a significant performance measurement difference during ignition startup. LO2 flow ranged from 5.9-9.5 lbm/sec (2.7-4.3 kg/sec), and LCH4 flow varied from 3.0-4.4 lbm/sec (1.4-2.0 kg/sec) during the RS-18 hot-fire test series. Thrust was measured using three load cells in parallel. Ignition was demonstrated using a gaseous oxygen/methane spark torch igniter. Data was obtained at multiple chamber pressures, and calculations were performed for specific impulse, C* combustion efficiency, and thrust vector alignment. Test objectives for the RS-18 project are 1) conduct a shakedown of the test stand for LO2/methane lunar ascent engines, 2) obtain vacuum ignition data for the torch and pyrotechnic igniters, and 3) obtain nozzle kinetics data to anchor two-dimensional kinetics codes.
Convert Ten Foot Environmental Test Chamber into an Ion Engine Test Chamber
NASA Technical Reports Server (NTRS)
VanVelzer, Paul
2006-01-01
The 10 Foot Space Simulator at the Jet Propulsion Laboratory has been used for the last 40 years to test numerous spacecraft, including the Ranger series, several Mariner class, among many others and finally, the Spirit and Opportunity Mars Rovers. The request was made to convert this facility to an Ion Engine test facility, with a possible long term life test. The Ion engine was to propel the Prometheus spacecraft to Jupiter's moons. This paper discusses the challenges that were met, both from a procedural and physical standpoint. The converted facility must operate unattended, support a 30 Kw Ion Engine, operate economically, and be easily converted back to former operation as a spacecraft test facility.
Site Characterization Report (Building 202). Volume 2. Appendicies A-H.
1996-04-01
Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and
6. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND ...
6. Photocopy of engineering drawing. AETR DIGS FACILITY THEODOLITE AND PRISM SHELTER: MONUMENT LOCATION AND LINE-OF-SIGHT PLAN, 1972. - Cape Canaveral Air Station, Launch Complex 17, Facility 28413, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
Ground test facility for SEI nuclear rocket engines
NASA Astrophysics Data System (ADS)
Harmon, Charles D.; Ottinger, Cathy A.; Sanchez, Lawrence C.; Shipers, Larry R.
1992-07-01
Nuclear (fission) thermal propulsion has been identified as a critical technology for a manned mission to Mars by the year 2019. Facilities are required that will support ground tests to qualify the nuclear rocket engine design, which must support a realistic thermal and neutronic environment in which the fuel elements will operate at a fraction of the power for a flight weight reactor/engine. This paper describes the design of a fuel element ground test facility, with a strong emphasis on safety and economy. The details of major structures and support systems of the facility are discussed, and a design diagram of the test facility structures is presented.
Total energy food plant 21 million gallon ethanol facility
NASA Astrophysics Data System (ADS)
1981-10-01
The Phase I Engineering study includes the following: process description, waste water treatment plant, material summary, energy chart, capital cost estimate, equipment list, personnel requirements, drawings list, specifications list, and project schedule. The economic and financial feasibility of the technical process, and environmental, health, safety, and socio-economic assessments for the project are reported. The costs for extending the following utilities to the property line of the selected site are presented: potable water, sewer system, electricity, roads for truck traffic, and rail service.
2008-11-21
to air squadrons. 4. USS John F. Kennedy was decommissioned in 2007. Source: Adapted from DoN 2006a Final EIS for the Proposed Homeporting of...Tugs Slot Small Craft 650 35 YD/YC/LCM Source: Adapted from Naval Facilities Engineering Service Center 2002 MCM = Mine Countermeasures DDG...It would include nonradiologically controlled spaces for administrative and other support functions. The design would be a site- adapted replication of
2000-01-31
The optical bench for the Fluids Integrated Rack section of the Fluids and Combustion Facility (FCF) is shown extracted for servicing. The FCF will be installed, in phases, in the Destiny, the U.S. Laboratory Module of the International Space Station (ISS), and will accommodate multiple users for a range of investigations. This is an engineering mockup; the flight hardware is subject to change as designs are refined. The FCF is being developed by the Microgravity Science Division (MSD) at the NASA Glenn Research Center. (Photo credit: NASA/Marshall Space Flight Center)
2000-01-31
The combustion chamber for the Combustion Integrated Rack section of the Fluids and Combustion Facility (FCF) is shown extracted for servicing. The FCF will be installed, in phases, in the Destiny, the U.S. Laboratory Module of the International Space Station (ISS), and will accommodate multiple users for a range of investigations. This is an engineering mockup; the flight hardware is subject to change as designs are refined. The FCF is being developed by the Microgravity Science Division (MSD) at the NASA Glenn Research Center. (Photo credit: NASA/Marshall Space Flight Center)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) has a longstanding sustainability program that revolves around energy and water efficiency as well as environmental protection. MSFC identified a problematic cooling loop with six separate compressor heat exchangers and a history of poor efficiency. The facility engineering team at MSFC partnered with Flozone Services, Incorporated to implement a comprehensive water treatment platform to improve the overall efficiency of the system.
1984-09-01
provided by private airline. Facilities and services include fuel, storage and outside tiedown, instruction, rental planes, unicorn radio and aircraft...project the population to grow between 41 and 44.5 percent from 1980 to 2030. The greatest increases in population are anticipated for Chesapeake and...VIRGINIA DEMOGRAPHIC CHARACTERISTICS Poquoson has been one of the fastest growing cities in Virginia over the past 20 years. While the surrounding
Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd
2012-12-01
Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.
Langley Mach 4 scramjet test facility
NASA Technical Reports Server (NTRS)
Andrews, E. H., Jr.; Torrence, M. G.; Anderson, G. Y.; Northam, G. B.; Mackley, E. A.
1985-01-01
An engine test facility was constructed at the NASA Langley Research Center in support of a supersonic combustion ramjet (scramjet) technology development program. Hydrogen combustion in air with oxygen replenishment provides simulated air at Mach 4 flight velocity, pressure, and true total temperature for an altitude range from 57,000 to 86,000 feet. A facility nozzle with a 13 in square exit produces a Mach 3.5 free jet flow for engine propulsion tests. The facility is described and calibration results are presented which demonstrate the suitability of the test flow for conducting scramjet engine research.
Cohn, Amy; Najavits, Lisa M
2014-04-01
Victimization by and perpetration of domestic violence are associated with co-occurring mental and substance use disorders. This study used data from the National Survey of Substance Abuse Treatment Services to examine differences in organizational factors, treatment approaches offered, and client-level factors among 13,342 substance abuse treatment facilities by whether or not they offered domestic violence services. Only 36% of the facilities offered domestic violence services. Those that offered such services were more likely than those that did not to treat clients with co-occurring disorders. Principal-components analysis reduced eight treatment approaches to two factors: psychosocial services and traditional substance abuse services. Regression models indicated that the frequency with which psychosocial services were offered depended on the percentage of clients with co-occurring disorders who were being treated in the facility and whether or not that facility offered domestic violence services. Specifically, facilities that did not offer domestic violence services and that had a high percentage of clients with co-occurring disorders were more likely to offer psychosocial services than facilities that offered domestic violence services. A larger proportion of facilities offering domestic violence services offered traditional substance abuse treatment services, compared with facilities not offering domestic violence services, but this relationship was not contingent on the percentage of clients with co-occurring disorders at each facility. Improved efforts should be made to tailor treatments to accommodate the links between domestic violence, mental disorders, and substance abuse.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, T. Jr
Volume IV represents the results of one of four major study areas under the Automotive Manufacturing Assessment System (AMAS) sponsored by the DOT/Transportation Systems Center. AMAS was designed to assist in the evaluation of industry's capability to produce fuel efficient vehicles. An analysis of automotive engine manufacturing was conducted in order to determine the impact of regulatory changes on tooling costs and the production process. The 351W CID V-8 engine at Ford's Windsor No. 1 Plant was the subject of the analysis. A review of plant history and its product is presented along with an analysis of manufacturing operations, includingmore » material and production flow, plant layout, machining and assembly processes, tooling, supporting facilities, inspection, service and repair. Four levels of product change intensity showing the impact on manufacturing methods and cost is also presented.« less
Establishing sustainable strategies in urban underground engineering.
Curiel-Esparza, Jorge; Canto-Perello, Julian; Calvo, Maria A
2004-07-01
Growth of urban areas, the corresponding increased demand for utility services and the possibility of new types of utility systems are overcrowding near surface underground space with urban utilities. Available subsurface space will continue to diminish to the point where utilidors (utility tunnels) may become inevitable. Establishing future sustainable strategies in urban underground engineering consists of the ability to lessen the use of traditional trenching. There is an increasing interest in utility tunnels for urban areas as a sustainable technique to avoid congestion of the subsurface. One of the principal advantages of utility tunnels is the substantially lower environmental impact compared with common trenches. Implementing these underground facilities is retarded most by the initial cost and management procedures. The habitual procedure is to meet problems as they arise in current practice. The moral imperative of sustainable strategies fails to confront the economic and political conflicts of interest. Municipal engineers should act as a key enabler in urban underground sustainable development.
Coal-Oil Mixtures Problems and Opportunities,
1982-01-15
Ernest C. Friedrich Ashland Oil, Inc. New Richmond, Ohio Cleveland, Ohio Florida Power Corporation American Refining Co., Inc. 3201 34th St. South...Room 1A 518, The Pentagon USAF Institute of Technology Washington, DC 20310 AFIT/DED Wright Patterson AFB, OH 45433 Commander-in-Chief USA, Europe...Engineer Facilities Engineer Fort A P Hill Lone Star Army Ammunition Plant Bowling Green, VA 22427 Texarkana , TX 75501 Facilities Engineer Facilities
NASA Astrophysics Data System (ADS)
Spitznagel, J. A.; Wood, Susan
1988-08-01
The Software Engineering institute is a federally funded research and development center sponsored by the Department of Defense (DOD). It was chartered by the Undersecretary of Defense for Research and Engineering on June 15, 1984. The SEI was established and is operated by Carnegie Mellon University (CUM) under contract F19628-C-0003, which was competitively awarded on December 28, 1984, by the Air Force Electronic Systems Division. The mission of the SEI is to provide the means to bring the ablest minds and the most effective technology to bear on the rapid improvement of the quality of operational software in mission-critical computer systems; to accelerate the reduction to practice of modern software engineering techniques and methods; to promulgate the use of modern techniques and methods throughout the mission-critical systems community; and to establish standards of excellence for the practice of software engineering. This report provides a summary of the programs and projects, staff, facilities, and service accomplishments of the Software Engineering Institute during 1987.
ETR AND MTR COMPLEXES IN CONTEXT. CAMERA FACING NORTHERLY. FROM ...
ETR AND MTR COMPLEXES IN CONTEXT. CAMERA FACING NORTHERLY. FROM BOTTOM TO TOP: ETR COOLING TOWER, ELECTRICAL BUILDING AND LOW-BAY SECTION OF ETR BUILDING, HEAT EXCHANGER BUILDING (WITH U SHAPED YARD), COMPRESSOR BUILDING. MTR REACTOR SERVICES BUILDING IS ATTACHED TO SOUTH WALL OF MTR. WING A IS ATTACHED TO BALCONY FLOOR OF MTR. NEAR UPPER RIGHT CORNER OF VIEW IS MTR PROCESS WATER BUILDING. WING B IS AT FAR WEST END OF COMPLEX. NEAR MAIN GATE IS GAMMA FACILITY, WITH "COLD" BUILDINGS BEYOND: RAW WATER STORAGE TANKS, STEAM PLANT, MTR COOLING TOWER PUMP HOUSE AND COOLING TOWER. INL NEGATIVE NO. 56-4101. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Escamilla, Veronica; Calhoun, Lisa; Winston, Jennifer; Speizer, Ilene S
2018-02-01
Universal access to health care requires service availability and accessibility for those most in need of maternal and child health services. Women often bypass facilities closest to home due to poor quality. Few studies have directly linked individuals to facilities where they sought maternal and child health services and examined the role of distance and quality on this facility choice. Using endline data from a longitudinal survey from a sample of women in five cities in Kenya, we examine the role of distance and quality on facility selection for women using delivery, facility-based contraceptives, and child health services. A survey of public and private facilities offering reproductive health services was also conducted. Distances were measured between household cluster location and both the nearest facility and facility where women sought care. A quality index score representing facility infrastructure, staff, and supply characteristics was assigned to each facility. We use descriptive statistics to compare distance and quality between the nearest available facility and visited facility among women who bypassed the nearest facility. Facility distance and quality comparisons were also stratified by poverty status. Logistic regression models were used to measure associations between the quality and distance to the nearest facility and bypassing for each outcome. The majority of women bypassed the nearest facility regardless of service sought. Women bypassing for delivery traveled the furthest and had the fewest facility options near their residential cluster. Poor women bypassing for delivery traveled 4.5 km further than non-poor women. Among women who bypassed, two thirds seeking delivery and approximately 46% seeking facility-based contraception or child health services bypassed to a public hospital. Both poor and non-poor women bypassed to higher quality facilities. Our findings suggest that women in five cities in Kenya prefer public hospitals and are willing to travel further to obtain services at public hospitals, possibly related to free service availability. Over time, it will be important to examine service quality and availability in public sector facilities with reduced or eliminated user fees, and whether it lends itself to a continuum of care where women can visit one facility for multiple services reducing travel burden.
12. Historic plot plan and drawings index for rocket engine ...
12. Historic plot plan and drawings index for rocket engine test facility, June 28, 1956. NASA GRC drawing number CE-101810. On file at NASA Glenn Research Center. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
5. Historic photo of scale model of rocket engine test ...
5. Historic photo of scale model of rocket engine test facility, June 18, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45264. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
10. Photocopy of drawing, February 1958, NUCLEAR REACTOR FACILITY, STRUCTURAL ...
10. Photocopy of drawing, February 1958, NUCLEAR REACTOR FACILITY, STRUCTURAL CROSS SECTION. Giffals & Vallet, Inc., L. Rosetti, Associated Architects and Engineers, Detroit, Michigan; and U.S. Army Engineer Division, New England Corps of Engineers, Boston, Massachusetts. Drawing Number 35-84-04. (Original: AMTL Engineering Division, Watertown). - Watertown Arsenal, Building No. 100, Wooley Avenue, Watertown, Middlesex County, MA
NASA Astrophysics Data System (ADS)
1981-09-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
NASA Technical Reports Server (NTRS)
1981-01-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
33 CFR 143.120 - Floating OCS facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT OCS Facilities § 143.120 Floating OCS facilities... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and Equipment). Where unusual design or equipment needs make compliance impracticable, alternative proposals...
Conceptual design of the MHD Engineering Test Facility
NASA Technical Reports Server (NTRS)
Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.
1981-01-01
The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false Nursing facility services for individuals age 21 or... Definitions § 440.40 Nursing facility services for individuals age 21 or older (other than services in an institution for mental disease), EPSDT, and family planning services and supplies. (a) Nursing facility...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Nursing facility services for individuals age 21 or... Definitions § 440.40 Nursing facility services for individuals age 21 or older (other than services in an institution for mental disease), EPSDT, and family planning services and supplies. (a) Nursing facility...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Nursing facility services for individuals age 21 or... Definitions § 440.40 Nursing facility services for individuals age 21 or older (other than services in an institution for mental disease), EPSDT, and family planning services and supplies. (a) Nursing facility...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false Nursing facility services for individuals age 21 or... Definitions § 440.40 Nursing facility services for individuals age 21 or older (other than services in an institution for mental disease), EPSDT, and family planning services and supplies. (a) Nursing facility...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false Nursing facility services for individuals age 21 or... Definitions § 440.40 Nursing facility services for individuals age 21 or older (other than services in an institution for mental disease), EPSDT, and family planning services and supplies. (a) Nursing facility...
Shawon, Md Shajedur Rahman; Adhikary, Gourab; Ali, Md Wazed; Shamsuzzaman, Md; Ahmed, Shahabuddin; Alam, Nurul; Shackelford, Katya A; Woldeab, Alexander; Lim, Stephen S; Levine, Aubrey; Gakidou, Emmanuela; Uddin, Md Jasim
2018-01-25
Service readiness of health facilities is an integral part of providing comprehensive quality healthcare to the community. Comprehensive assessment of general and service-specific (i.e. child immunization) readiness will help to identify the bottlenecks in healthcare service delivery and gaps in equitable service provision. Assessing healthcare facilities readiness also helps in optimal policymaking and resource allocation. A health facility survey was conducted between March 2015 and December 2015 in two purposively selected divisions in Bangladesh; i.e. Rajshahi division (high performing) and Sylhet division (low performing). A total of 123 health facilities were randomly selected from different levels of service, both public and private, with variation in sizes and patient loads from the list of facilities. Data on various aspects of healthcare facility were collected by interviewing key personnel. General service and child immunization specific service readiness were assessed using the Service Availability and Readiness Assessment (SARA) manual developed by World Health Organization (WHO). The analyses were stratified by division and level of healthcare facilities. The general service readiness index for pharmacies, community clinics, primary care facilities and higher care facilities were 40.6%, 60.5%, 59.8% and 69.5%, respectively in Rajshahi division and 44.3%, 57.8%, 57.5% and 73.4%, respectively in Sylhet division. Facilities at all levels had the highest scores for basic equipment (ranged between 51.7% and 93.7%) and the lowest scores for diagnostic capacity (ranged between 0.0% and 53.7%). Though facilities with vaccine storage capacity had very high levels of service readiness for child immunization, facilities without vaccine storage capacity lacked availability of many tracer items. Regarding readiness for newly introduced pneumococcal conjugate vaccine (PCV) and inactivated polio vaccine (IPV), most of the surveyed facilities reported lack of sufficient funding and resources (antigen) for training programs. Our study suggested that health facilities suffered from lack of readiness in various aspects, most notably in diagnostic capacity. Conversely, with very few challenges, nearly all the health facilities designated to provide immunization services were ready to deliver routine childhood immunization services as well as newly introduced PCV and IPV.
Kilic, Dogushan; Brem, Benjamin T; Klein, Felix; El-Haddad, Imad; Durdina, Lukas; Rindlisbacher, Theo; Setyan, Ari; Huang, Rujin; Wang, Jing; Slowik, Jay G; Baltensperger, Urs; Prevot, Andre S H
2017-04-04
Nonmethane organic gas emissions (NMOGs) from in-service aircraft turbine engines were investigated using a proton transfer reaction time-of-flight mass spectrometer (PTR-ToF-MS) at an engine test facility at Zurich Airport, Switzerland. Experiments consisted of 60 exhaust samples for seven engine types (used in commercial aviation) from two manufacturers at thrust levels ranging from idle to takeoff. Emission indices (EIs) for more than 200 NMOGs were quantified, and the functional group fractions (including acids, carbonyls, aromatics, and aliphatics) were calculated to characterize the exhaust chemical composition at different engine operation modes. Total NMOG emissions were highest at idling with an average EI of 7.8 g/kg fuel and were a factor of ∼40 lower at takeoff thrust. The relative contribution of pure hydrocarbons (particularly aromatics and aliphatics) of the engine exhaust decreased with increasing thrust while the fraction of oxidized compounds, for example, acids and carbonyls increased. Exhaust chemical composition at idle was also affected by engine technology. Older engines emitted a higher fraction of nonoxidized NMOGs compared to newer ones. Idling conditions dominated ground level organic gas emissions. Based on the EI determined here, we estimate that reducing idle emissions could substantially improve air quality near airports.
The Pollution Prevention Opportunity Assessments (PPOA) summarized here were conducted at the following representative Army Corps of Engineers (USAGE) Civil Works facilities: Pittsburgh Engineering Warehouse and Repair Station (PEWARS) and Emsworth Locks and Dams in Pittsburgh, P...
11. Historic photo of cutaway rendering of rocket engine test ...
11. Historic photo of cutaway rendering of rocket engine test facility complex, June 11, 1965. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-74433. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...
42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...
42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...
42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...
42 CFR 440.155 - Nursing facility services, other than in institutions for mental diseases.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false Nursing facility services, other than in... PROVISIONS Definitions § 440.155 Nursing facility services, other than in institutions for mental diseases. (a) “Nursing facility services, other than in an institution for mental diseases” means services...
Agha, Sohail; Do, Mai
2009-04-01
To compare the quality of family planning services delivered at public and private facilities in Kenya. Data from the 2004 Kenya Service Provision Assessment were analysed. The Kenya Service Provision Assessment is a representative sample of health facilities in the public and private sectors, and comprises data obtained from a facility inventory, service provider interviews, observations of client-provider interactions and exit interviews. Quality-of-care indicators are compared between the public and private sectors along three dimensions: structure, process and outcome. Private facilities were superior to public sector facilities in terms of physical infrastructure and the availability of services. Public sector facilities were more likely to have management systems in place. There was no difference between public and private providers in the technical quality of care provided. Private providers were better at managing interpersonal aspects of care. The higher level of client satisfaction at private facilities could not be explained by differences between public and private facilities in structural and process aspects of care. Formal private sector facilities providing family planning services exhibit greater readiness to provide services and greater attention to client needs than public sector facilities in Kenya. Consistent with this, client satisfaction is much higher at private facilities. Technical quality of care provided is similar in public and private facilities.
Code JEF Facilities Engineering Home Page for the Internet
NASA Technical Reports Server (NTRS)
Mahaffey, Valerie A.; Harrison, Marla J. (Technical Monitor)
1995-01-01
There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.
Engineering graphics data entry for space station data base
NASA Technical Reports Server (NTRS)
Lacovara, R. C.
1986-01-01
The entry of graphical engineering data into the Space Station Data Base was examined. Discussed were: representation of graphics objects; representation of connectivity data; graphics capture hardware; graphics display hardware; site-wide distribution of graphics, and consolidation of tools and hardware. A fundamental assumption was that existing equipment such as IBM based graphics capture software and VAX networked facilities would be exploited. Defensible conclusions reached after study and simulations of use of these systems at the engineering level are: (1) existing IBM based graphics capture software is an adequate and economical means of entry of schematic and block diagram data for present and anticipated electronic systems for Space Station; (2) connectivity data from the aforementioned system may be incorporated into the envisioned Space Station Data Base with modest effort; (3) graphics and connectivity data captured on the IBM based system may be exported to the VAX network in a simple and direct fashion; (4) graphics data may be displayed site-wide on VT-125 terminals and lookalikes; (5) graphics hard-copy may be produced site-wide on various dot-matrix printers; and (6) the system may provide integrated engineering services at both the engineering and engineering management level.
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. The provisions of...
EPA Facility Registry Service (FRS): CERCLIS
This data provides location and attribute information on Facilities regulated under the Comprehensive Environmental Responsibility Compensation and Liability Information System (CERCLIS) for a intranet web feature service . The data provided in this service are obtained from EPA's Facility Registry Service (FRS). The FRS is an integrated source of comprehensive (air, water, and waste) environmental information about facilities, sites or places. This service connects directly to the FRS database to provide this data as a feature service. FRS creates high-quality, accurate, and authoritative facility identification records through rigorous verification and management procedures that incorporate information from program national systems, state master facility records, data collected from EPA's Central Data Exchange registrations and data management personnel. Additional Information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.
Altitude Testing of Large Liquid Propellant Engines
NASA Technical Reports Server (NTRS)
Maynard, Bryon T.; Raines, Nickey G.
2010-01-01
The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.
7 CFR 1724.30 - Borrowers' requirements-engineering services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Borrowers' requirements-engineering services. 1724.30... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.30 Borrowers' requirements—engineering services. Link to an amendment...
14. Historic view of engineer in Building 100 control room ...
14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-17
This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA05-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status.« less
42 CFR 31.10 - Dependent members of families; use of Service facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... facilities. 31.10 Section 31.10 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Survey and Public Health Service § 31.10 Dependent members of families; use of Service facilities. (a) A... facilities only at medical relief stations where full-time officers are on duty. (Sec. 326, 58 Stat. 697, as...
NASA Technical Reports Server (NTRS)
Pirrello, C. J.; Hardin, R. D.; Capelluro, L. P.; Harrison, W. D.
1971-01-01
The general purpose capabilities of government and industry in the area of real time engineering flight simulation are discussed. The information covers computer equipment, visual systems, crew stations, and motion systems, along with brief statements of facility capabilities. Facility construction and typical operational costs are included where available. The facilities provide for economical and safe solutions to vehicle design, performance, control, and flying qualities problems of manned and unmanned flight systems.
2001-01-12
This final rule modifies the Medicaid upper payment limits for inpatient hospital services, outpatient hospital services, nursing facility services, intermediate care facility services for the mentally retarded, and clinic services. For each type of Medicaid inpatient service, existing regulations place an upper limit on overall aggregate payments to all facilities and a separate aggregate upper limit on payments made to State-operated facilities. This final rule establishes an aggregate upper limit that applies to payments made to government facilities that are not State government-owned or operated, and a separate aggregate upper limit on payments made to privately-owned and operated facilities. This rule also eliminates the overall aggregate upper limit that had applied to these services. With respect to outpatient hospital and clinic services, this final rule establishes an aggregate upper limit on payments made to State government-owned or operated facilities, an aggregate upper limit on payments made to government facilities that are not State government-owned or operated, and an aggregate upper limit on payments made to privately-owned and operated facilities. These separate upper limits are necessary to ensure State Medicaid payment systems promote economy and efficiency. We are allowing a higher upper limit for payment to non-State public hospitals to recognize the higher costs of inpatient and outpatient services in public hospitals. In addition, to ensure continued beneficiary access to care and the ability of States to adjust to the changes in the upper payment limits, the final rule includes a transition period for States with approved rate enhancement State plan amendments.
Optimal pricing policies for services with consideration of facility maintenance costs
NASA Astrophysics Data System (ADS)
Yeh, Ruey Huei; Lin, Yi-Fang
2012-06-01
For survival and success, pricing is an essential issue for service firms. This article deals with the pricing strategies for services with substantial facility maintenance costs. For this purpose, a mathematical framework that incorporates service demand and facility deterioration is proposed to address the problem. The facility and customers constitute a service system driven by Poisson arrivals and exponential service times. A service demand with increasing price elasticity and a facility lifetime with strictly increasing failure rate are also adopted in modelling. By examining the bidirectional relationship between customer demand and facility deterioration in the profit model, the pricing policies of the service are investigated. Then analytical conditions of customer demand and facility lifetime are derived to achieve a unique optimal pricing policy. The comparative statics properties of the optimal policy are also explored. Finally, numerical examples are presented to illustrate the effects of parameter variations on the optimal pricing policy.
32 CFR 644.424 - Development of public port or industrial facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... industrial facilities upon the available land shall file a written application with the District Engineer... development of public port or industrial facilities, the District Engineer shall give notice of such... 32 National Defense 4 2011-07-01 2011-07-01 false Development of public port or industrial...
32 CFR 644.424 - Development of public port or industrial facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... industrial facilities upon the available land shall file a written application with the District Engineer... development of public port or industrial facilities, the District Engineer shall give notice of such... 32 National Defense 4 2010-07-01 2010-07-01 true Development of public port or industrial...
Mach 5 to 7 RBCC Propulsion System Testing at NASA-LeRC HTF
NASA Technical Reports Server (NTRS)
Perkins, H. Douglas; Thomas, Scott R.; Pack, William D.
1996-01-01
A series of Mach 5 to 7 freejet tests of a Rocket Based Combined Cycle (RBCC) engine were cnducted at the NASA Lewis Research Center (LERC) Hypersonic Tunnel Facility (HTF). This paper describes the configuration and operation of the HTF and the RBCC engine during these tests. A number of facility support systems are described which were added or modified to enhance the HTF test capability for conducting this experiment. The unfueled aerodynamic perfor- mance of the RBCC engine flowpath is also presented and compared to sub-scale test results previously obtained in the NASA LERC I x I Supersonic Wind Tunnel (SWT) and to Computational Fluid Dynamic (CFD) analysis results. This test program demonstrated a successful configuration of the HTF for facility starting and operation with a generic RBCC type engine and an increased range of facility operating conditions. The ability of sub-scale testing and CFD analysis to predict flowpath performance was also shown. The HTF is a freejet, blowdown propulsion test facility that can simulate up to Mach 7 flight conditions with true air composition. Mach 5, 6, and 7 facility nozzles are available, each with an exit diameter of 42 in. This combination of clean air, large scale, and Mach 7 capabilities is unique to the HTF. This RBCC engine study is the first engine test program conducted at the HTF since 1974.
Kanyangarara, Mufaro; Chou, Victoria B; Creanga, Andreea A; Walker, Neff
2018-06-01
Improving access and quality of obstetric service has the potential to avert preventable maternal, neonatal and stillborn deaths, yet little is known about the quality of care received. This study sought to assess obstetric service availability, readiness and coverage within and between 17 low- and middle-income countries. We linked health facility data from the Service Provision Assessments and Service Availability and Readiness Assessments, with corresponding household survey data obtained from the Demographic and Health Surveys and Multiple Indicator Cluster Surveys. Based on performance of obstetric signal functions, we defined four levels of facility emergency obstetric care (EmOC) functionality: comprehensive (CEmOC), basic (BEmOC), BEmOC-2, and low/substandard. Facility readiness was evaluated based on the direct observation of 23 essential items; facilities "ready to provide obstetric services" had ≥20 of 23 items available. Across countries, we used medians to characterize service availability and readiness, overall and by urban-rural location; analyses also adjusted for care-seeking patterns to estimate population-level coverage of obstetric services. Of the 111 500 health facilities surveyed, 7545 offered obstetric services and were included in the analysis. The median percentages of facilities offering EmOC and "ready to provide obstetric services" were 19% and 10%, respectively. There were considerable urban-rural differences, with absolute differences of 19% and 29% in the availability of facilities offering EmOC and "ready to provide obstetric services", respectively. Adjusting for care-seeking patterns, results from the linking approach indicated that among women delivering in a facility, a median of 40% delivered in facilities offering EmOC, and 28% delivered in facilities "ready to provide obstetric services". Relatively higher coverage of facility deliveries (≥65%) and coverage of deliveries in facilities "ready to provide obstetric services" (≥30% of facility deliveries) were only found in three countries. The low levels of availability, readiness and coverage of obstetric services documented represent substantial missed opportunities within health systems. Global and national efforts need to prioritize upgrading EmOC functionality and improving readiness to deliver obstetric service, particularly in rural areas. The approach of linking health facility and household surveys described here could facilitate the tracking of progress towards quality obstetric care.
15. Historic view of engineer in Building 100 control room ...
15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH
Free-standing health care facilities: financial arrangements, quality assurance and a pilot study
Lavis, J N; Lomas, J; Anderson, G M; Donner, A; Iscoe, N A; Gold, G; Craighead, J
1998-01-01
Free-standing health care facilities now deliver many diagnostic and therapeutic services formerly provided only in hospitals. The financial arrangements available to these facilities differ according to whether the services are uninsured or insured. For an uninsured service, such as cosmetic surgery, the patient pays a fee directly to the service provider. For an insured service, such as cataract surgery, the provincial government uses tax revenues to fund the facility by paying it a facility fee and remunerates the physician who provided the service with a professional fee. No comprehensive, proactive quality assurance efforts have been implemented for either these facilities or the clinical practice provided within them. A pilot study involving therapeutic facilities in Ontario has suggested that a large-scale quality improvement effort could be undertaken in these facilities and rigorously evaluated. PMID:9484263
Free-standing health care facilities: financial arrangements, quality assurance and a pilot study.
Lavis, J N; Lomas, J; Anderson, G M; Donner, A; Iscoe, N A; Gold, G; Craighead, J
1998-02-10
Free-standing health care facilities now deliver many diagnostic and therapeutic services formerly provided only in hospitals. The financial arrangements available to these facilities differ according to whether the services are uninsured or insured. For an uninsured service, such as cosmetic surgery, the patient pays a fee directly to the service provider. For an insured service, such as cataract surgery, the provincial government uses tax revenues to fund the facility by paying it a facility fee and remunerates the physician who provided the service with a professional fee. No comprehensive, proactive quality assurance efforts have been implemented for either these facilities or the clinical practice provided within them. A pilot study involving therapeutic facilities in Ontario has suggested that a large-scale quality improvement effort could be undertaken in these facilities and rigorously evaluated.
EPA Facility Registry Service (FRS): NEI
This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the National Emissions Inventory (NEI) Program dataset. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs
The SSMEPF opens with a ribbon-cutting ceremony
NASA Technical Reports Server (NTRS)
1998-01-01
Participants in the ribbon cutting for KSC's new 34,600-square- foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B. Sieck, director of Shuttle Processing; KSC Center Director Roy D. Bridges Jr.; U.S. Congressman Dave Weldon; John Plowden, vice president of Rocketdyne; and Donald R. McMonagle, manager of Launch Integration. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.
46 CFR 160.151-45 - Equipment required for servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Equipment required for servicing facilities. 160.151-45 Section 160.151-45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT...) § 160.151-45 Equipment required for servicing facilities. Each servicing facility approved by the Coast...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Public Availability of Defense Nuclear Facilities Safety Board FY 2011 Service Contract Inventory Analysis/FY 2012 Service Contract Inventory AGENCY: Defense Nuclear Facilities Safety Board (DNFSB). ACTION: Notice of Public Availability of FY 2011 Service Contract...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Public Availability of Defense Nuclear Facilities Safety Board; FY 2010 Service Contract Inventory Analysis/FY 2011 Service Contract Inventory AGENCY: Defense Nuclear Facilities Safety Board (DNFSB). ACTION: Notice of Public Availability of FY 2010 Service Contract...
NASA Technical Reports Server (NTRS)
Flegel, Ashlie B.; Oliver, Michael J.
2016-01-01
Preliminary results from the Heavily Instrumented ALF503R-5 Engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory will be discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This model engine, serial number LF01, was used during the inaugural icing test in the PSL facility. The reduction of thrust (rollback) events experienced by this engine in flight were replicated in the facility. Limited instrumentation was used to detect icing. Metal temperature on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect characterize ice accretion, and visualize the ice accretion in the region of interest.
Sea Level Operation Demonstration of F404-GE-400 Turbofan Engine with JP-5/Bio-Fuel Mixture
2010-03-30
Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test consisted of two separate...turbofan engine inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test...turbofan engine (ESN 310810) inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station (NAS) Patuxent River, Maryland, on 13
NASA Astrophysics Data System (ADS)
1981-09-01
Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.
NASA Technical Reports Server (NTRS)
1981-01-01
Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
Application of the ABC helicopter to the emergency medical service role
NASA Technical Reports Server (NTRS)
Levine, L. S.
1981-01-01
Attention is called to the use of helicopters in transporting the sick and injured to medical facilities. It is noted that the helicopter's speed of response and delivery increases patient survival rates and may reduce the cost of medical care and its burden on society. Among the vehicle characteristics desired for this use are a cruising speed of 200 knots, a single engine hover capability at 10,000 ft, and an absence of a tail rotor. Three designs for helicopters incorporating such new technologies as digital/optical control systems, all composite air-frames, and third-generation airfoils are presented. A sensitivity analysis is conducted to show the effect of design speed, mission radius, and single engine hover capability on vehicle weight, fuel consumption, operating costs, and productivity.
42 CFR 440.150 - Intermediate care facility (ICF/MR) services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Intermediate care facility (ICF/MR) services. 440....150 Intermediate care facility (ICF/MR) services. (a) “ICF/MR services” means those items and services furnished in an intermediate care facility for the mentally retarded if the following conditions are met: (1...
Winter, Rebecca; Yourkavitch, Jennifer; Wang, Wenjuan; Mallick, Lindsay
2017-01-01
Background Despite the importance of health facility capacity to provide comprehensive care, the most widely used indicators for global monitoring of maternal and child health remain contact measures which assess women’s use of services only and not the capacity of health facilities to provide those services; there is a gap in monitoring health facilities’ capacity to provide newborn care services in low and middle income countries. Methods In this study we demonstrate a measurable framework for assessing health facility capacity to provide newborn care using open access, nationally–representative Service Provision Assessment (SPA) data from the Demographic Health Surveys Program. In particular, we examine whether key newborn–related services are available at the facility (ie, service availability, measured by the availability of basic emergency obstetric care (BEmOC) signal functions, newborn signal functions, and routine perinatal services), and whether the facility has the equipment, medications, training and knowledge necessary to provide those services (ie, service readiness, measured by general facility requirements, equipment, medicines and commodities, and guidelines and staffing) in five countries with high levels of neonatal mortality and recent SPA data: Bangladesh, Haiti, Malawi, Senegal, and Tanzania. Findings In each country, we find that key services and commodities needed for comprehensive delivery and newborn care are missing from a large percentage of facilities with delivery services. Of three domains of service availability examined, scores for routine care availability are highest, while scores for newborn signal function availability are lowest. Of four domains of service readiness examined, scores for general requirements and equipment are highest, while scores for guidelines and staffing are lowest. Conclusions Both service availability and readiness tend to be highest in hospitals and facilities in urban areas, pointing to substantial equity gaps in the availability of essential newborn care services for rural areas and for people accessing lower–level facilities. Together, the low levels of both service availability and readiness across the five countries reinforce the vital importance of monitoring health facility capacity to provide care. In order to save newborn lives and improve equity in child survival, not only does women’s use of services need to increase, but facility capacity to provide those services must also be enhanced. PMID:29423186
7 CFR 1724.31 - Engineering services contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering services contracts. 1724.31 Section 1724..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.31 Engineering services contracts. The provisions of this section apply only to...
7 CFR 1753.17 - Engineering services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering services. 1753.17 Section 1753.17... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Engineering Services § 1753.17 Engineering services. (a)(1) All engineering services required by a borrower to support its application for a...
7 CFR 1724.31 - Engineering services contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering services contracts. 1724.31 Section 1724..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.31 Engineering services contracts. The provisions of this section apply only to...
7 CFR 1724.31 - Engineering services contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering services contracts. 1724.31 Section 1724..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.31 Engineering services contracts. The provisions of this section apply only to...
7 CFR 1753.17 - Engineering services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering services. 1753.17 Section 1753.17... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Engineering Services § 1753.17 Engineering services. (a)(1) All engineering services required by a borrower to support its application for a...
7 CFR 1753.17 - Engineering services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering services. 1753.17 Section 1753.17... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Engineering Services § 1753.17 Engineering services. (a)(1) All engineering services required by a borrower to support its application for a...
7 CFR 1724.31 - Engineering services contracts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering services contracts. 1724.31 Section 1724..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.31 Engineering services contracts. The provisions of this section apply only to...
7 CFR 1753.17 - Engineering services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering services. 1753.17 Section 1753.17... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Engineering Services § 1753.17 Engineering services. (a)(1) All engineering services required by a borrower to support its application for a...
7 CFR 1753.17 - Engineering services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering services. 1753.17 Section 1753.17... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Engineering Services § 1753.17 Engineering services. (a)(1) All engineering services required by a borrower to support its application for a...
7 CFR 1724.31 - Engineering services contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering services contracts. 1724.31 Section 1724..., DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Engineering Services § 1724.31 Engineering services contracts. The provisions of this section apply only to...
NASA Engineer Examines the Design of a Regeneratively-Cooled Rocket Engine
1958-12-21
An engineer at the National Aeronautics and Space Administration (NASA) Lewis Research Center examines a drawing showing the assembly and details of a 20,000-pound thrust regeneratively cooled rocket engine. The engine was being designed for testing in Lewis’ new Rocket Engine Test Facility, which began operating in the fall of 1957. The facility was the largest high-energy test facility in the country that was capable of handling liquid hydrogen and other liquid chemical fuels. The facility’s use of subscale engines up to 20,000 pounds of thrust permitted a cost-effective method of testing engines under various conditions. The Rocket Engine Test Facility was critical to the development of the technology that led to the use of hydrogen as a rocket fuel and the development of lightweight, regeneratively-cooled, hydrogen-fueled rocket engines. Regeneratively-cooled engines use the cryogenic liquid hydrogen as both the propellant and the coolant to prevent the engine from burning up. The fuel was fed through rows of narrow tubes that surrounded the combustion chamber and nozzle before being ignited inside the combustion chamber. The tubes are visible in the liner sitting on the desk. At the time, Pratt and Whitney was designing a 20,000-pound thrust liquid-hydrogen rocket engine, the RL-10. Two RL-10s would be used to power the Centaur second-stage rocket in the 1960s. The successful development of the Centaur rocket and the upper stages of the Saturn V were largely credited to the work carried out Lewis.
2012-01-01
Abstract Principal investigators who received Clinical and Translational Science Awards created academic homes for biomedical research. They developed program‐supported websites to offer coordinated access to a range of core facilities and other research resources. Visitors to the 60 websites will find at least 170 generic services, which this review has categorized in the following seven areas: (1) core facilities, (2) biomedical informatics, (3) funding, (4) regulatory knowledge and support, (5) biostatistics, epidemiology, research design, and ethics, (6) participant and clinical interaction resources, and (7) community engagement. In addition, many websites facilitate access to resources with search engines, navigators, studios, project development teams, collaboration tools, communication systems, and teaching tools. Each of these websites may be accessed from a single site, http://www.CTSAcentral.org. The ability to access the research resources from 60 of the nation's academic health centers presents a novel opportunity for investigators engaged in clinical and translational research. Clin Trans Sci 2012; Volume #: 1–5 PMID:22376262
Rosenblum, Daniel
2012-02-01
Principal investigators who received Clinical and Translational Science Awards created academic homes for biomedical research. They developed program-supported websites to offer coordinated access to a range of core facilities and other research resources. Visitors to the 60 websites will find at least 170 generic services, which this review has categorized in the following seven areas: (1) core facilities, (2) biomedical informatics, (3) funding, (4) regulatory knowledge and support, (5) biostatistics, epidemiology, research design, and ethics, (6) participant and clinical interaction resources, and (7) community engagement. In addition, many websites facilitate access to resources with search engines, navigators, studios, project development teams, collaboration tools, communication systems, and teaching tools. Each of these websites may be accessed from a single site, http://www.CTSAcentral.org. The ability to access the research resources from 60 of the nation's academic health centers presents a novel opportunity for investigators engaged in clinical and translational research. © 2012 Wiley Periodicals, Inc.
Alam, Badrul; Mridha, Malay K; Biswas, Taposh K; Roy, Lumbini; Rahman, Maksudur; Chowdhury, Mahbub E
2015-10-01
To assess the coverage of emergency obstetric care (EmOC) and the availability of obstetric services in Bangladesh. In a national health facility assessment performed between November 2007 and July 2008, all public EmOC facilities and private facilities providing obstetric services in the 64 districts of Bangladesh were mapped. The performance of EmOC services in these facilities during the preceding month was investigated using a semi-structured questionnaire completed through interviews of managers and service providers, and record review. In total, 8.6 (2.1 public and 6.5 private) facilities per 500000 population offered obstetric care services. Population coverage by obstetric care facilities varied by region. Among 281 public facilities designated for comprehensive EmOC, cesarean delivery was available in only 215 (76.5%) and blood transfusion services in 198 (70.5%). In the private sector (for profit and not for profit), these services were available in more than 80% of facilities. In all facility types, performance of assisted vaginal delivery (range 12.2%-48.4%) and use of parenteral anticonvulsants to treat pre-eclampsia/eclampsia (range 48.6%-80.8%) were low. The main reason for non-availability of EmOC services was a lack of specialist/trained providers. Bangladesh needs to increase the availability of EmOC services through innovative public-private partnerships. In the public sector, additional trained manpower supported by an incentivized package should be deployed. Copyright © 2015. Published by Elsevier Ireland Ltd.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... Engineering Command Northwest, 1101 Tautog Circle, Suite 203, Silverdale, WA 98315-1101, Attn: NWSTF Boardman... mailed to Naval Facilities Engineering Command Northwest, Attention: Mrs. Amy Burt, NWSTF Boardman EIS Project Manager, Naval Facilities Engineering Command Northwest, 1101 Tautog Circle, Suite 203, Silverdale...
Analysis of Student Satisfaction Toward Quality of Service Facility
NASA Astrophysics Data System (ADS)
Napitupulu, D.; Rahim, R.; Abdullah, D.; Setiawan, MI; Abdillah, LA; Ahmar, AS; Simarmata, J.; Hidayat, R.; Nurdiyanto, H.; Pranolo, A.
2018-01-01
The development of higher education is very rapid rise to the tight competition both public universities and private colleges. XYZ University realized to win the competition, required continuous quality improvement, including the quality of existing service facilities. Amenities quality services is believed to support the success of the learning activities and improve user satisfaction. This study aims to determine the extent to which the quality of the services effect on user satisfaction. The research method used is survey-based questionnaire that measure perception and expectation. The results showed a gap between perception and expectations of the respondents have a negative value for each item. This means XYZ service facility at the university is not currently meet the expectations of society members. Three service facility that has the lowest index is based on the perception of respondents is a laboratory (2.56), computer and multimedia (2.63) as well as wifi network (2.99). The magnitude of the correlation between satisfaction with the quality of service facilities is 0.725 which means a strong and positive relationship. The influence of the quality of service facilities to the satisfaction of the students is 0.525 meaning that the variable quality of the services facility can explain 52.5% of the variable satisfaction. The study provided recommendations for improvements to enhance the quality of services facility at the XYZ university facilities.
Development of a Facility Management and Improvement Manual for Army Service Schools.
1983-03-01
Ehhhhomhmhhhhlo EEEEEEEohhhhhI L-Ii Ilk . ~MICROCOPY RESOLUTION TEST CHART NATIONAL BURESU Of STA OSN-T63-A NA01BRA FSADRS16- construction m*nilhlli 8mbtg 10b...U.S. Army Construction Engineering Research Lab. P.O. Box 4005 • 4A762731AT41-A-001 Champaign, IL 61820 _ It. CONTROLLING OFFICtNAME AND ADDRESS 37...developing a data collection and analysis method. The prototype method was discussed in CERL Interim Report P-ill. 3 This prototype method was tested by
PBF Reactor Building (PER620). Plot plan shows layout, including auxiliary ...
PBF Reactor Building (PER-620). Plot plan shows layout, including auxiliary buildings: Emergency Generator (621), Hose House (622), Cooling Tower Auxiliary (624), Maintenance and Storage Warehouse (625), Gas Cylinder Storage (627), Hose House (628), Cooling Tower (720), Substation (719), and other features. Road connections between PBF Reactor, its control building, and SPERT-I site. Note cable trenches along road to control building. Date: July 1965. Ebasco Services, PER-U-101. INEEL index no. 761-0100-00-205-123005 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Healthcare Energy End-Use Monitoring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheppy, M.; Pless, S.; Kung, F.
NREL partnered with two hospitals (MGH and SUNY UMU) to collect data on the energy used for multiple thermal and electrical end-use categories, including preheat, heating, and reheat; humidification; service water heating; cooling; fans; pumps; lighting; and select plug and process loads. Additional data from medical office buildings were provided for an analysis focused on plug loads. Facility managers, energy managers, and engineers in the healthcare sector will be able to use these results to more effectively prioritize and refine the scope of investments in new metering and energy audits.
An Investigation of Flame Stability in a Coaxial Dump Combustor
1979-05-18
M.Sc. Approved: Chairman (9 ~%46 ’A L4A4 lee /0 9 77 Accepted: Dean , School of Engineering Acknowledgements I wish to express my appreciation to Dr...correlating a large quantity of experimental data and to Dr. Frank D. Stull , who made the facility and the services of the test group available for this...correlation quoted by Stull et al. (Ref 1), a value of 6 equal to * Note that U and P in this expression correspond to the values at flame blow-off: these
International Space Station -- Combustion Rack
NASA Technical Reports Server (NTRS)
2000-01-01
The combustion chamber for the Combustion Integrated Rack section of the Fluids and Combustion Facility (FCF) is shown extracted for servicing. The FCF will be installed, in phases, in the Destiny, the U.S. Laboratory Module of the International Space Station (ISS), and will accommodate multiple users for a range of investigations. This is an engineering mockup; the flight hardware is subject to change as designs are refined. The FCF is being developed by the Microgravity Science Division (MSD) at the NASA Glenn Research Center. (Photo credit: NASA/Marshall Space Flight Center)
International Space Station -- Fluid Physics Rack
NASA Technical Reports Server (NTRS)
2000-01-01
The optical bench for the Fluids Integrated Rack section of the Fluids and Combustion Facility (FCF) is shown extracted for servicing. The FCF will be installed, in phases, in the Destiny, the U.S. Laboratory Module of the International Space Station (ISS), and will accommodate multiple users for a range of investigations. This is an engineering mockup; the flight hardware is subject to change as designs are refined. The FCF is being developed by the Microgravity Science Division (MSD) at the NASA Glenn Research Center. (Photo credit: NASA/Marshall Space Flight Center)
Johnson Space Center: Workmanship Training
NASA Technical Reports Server (NTRS)
Patterson, Ashley; Sikes, Larry; Corbin, Cheryl; Rucka, Becky
2015-01-01
Special processes require special skills, knowledge and experienced application. For over 15 years, the NASA Johnson Space Center's Receiving, Inspection and Test Facility (RITF) has provided Agency-wide NASA Workmanship Standards compliance training, issuing more than 500 to 800 training completion certificates annually. It is critical that technicians and inspectors are trained and that they maintain their proficiency to implement the applicable standards and specifications. Training services include "hands-on" training to engineers, technicians, and inspectors in the areas of electrostatic discharge (ESD), soldering, surface mount technology (SMT), crimping, conformal coating, and fiber-optic terminations.
NASA Technical Reports Server (NTRS)
Patterson, Ashley; Sikes, Larry; Corbin, Cheryl; Rucka, Rebecca
2015-01-01
Special processes require special skills, knowledge and experienced application. For over 15 years, the NASA Johnson Space Center's Receiving, Inspection and Test Facility (RITF) has provided Workmanship Standards compliance training, issuing more than 500 to 800 training completion certificates annually. It is critical that technicians and inspectors are trained and that they maintain their proficiency to implement the applicable standards and specifications. Training services include 'hands-on' training to engineers, technicians, and inspectors in the areas of electrostatic discharge (ESD), soldering, fiber optics, lithium battery handling, torque and wire safety, and wire wrapping.
2012-11-09
CAPE CANAVERAL, Fla. -- At the Neo Liquid Propellant Testbed inside a facility near Kennedy Space Center’s Shuttle Landing Facility in Florida, engineers are working on the buildup of the Neo test fixture and an Injector 71 engine that uses super-cooled propellants. NASA engineers are working on the design and assembly of the Neo Liquid Propellant Testbed as part of the Engineering Directorate’s Rocket University training program. Photo credit: NASA/Frankie Martin
2012-11-09
CAPE CANAVERAL, Fla. -- At the Neo Liquid Propellant Testbed inside a facility near Kennedy Space Center’s Shuttle Landing Facility in Florida, engineers are working on the buildup of the Neo test fixture and an Injector 71 engine that uses super-cooled propellants. NASA engineers are working on the design and assembly of the Neo Liquid Propellant Testbed as part of the Engineering Directorate’s Rocket University training program. Photo credit: NASA/Frankie Martin
AMMA 2005 Dakar International Conference to be Held November 28-December 2, 2005
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lamb, Peter
2006-05-09
Consistent with the original proposal (dated April 14, 2005), the grant supported the participation in the above conference of a number of West African meteorologists, the majority of whom will be supporting the ARM Mobile Facility deployment in Niamey in various ways during 2006. The following seven individuals were fully funded (complete airfare, accommodation, registration, meals) to participate in the Conference –Yerima Ladan (Head, ASECNA Forecast Office, Niamey Airport); Dr. Ousmane Manga Adamou (University of Niamey); Abdou Adam Abdoul-Aziz Abebe (Forecasater, ASECNA Forecast Office, Niamey Airport); Hassane Abdou (Forecaster, ASECNA Forecast Office, Niamey Airport); Saley Diori (Forecaster, ASECNA Forecast Office,more » Niamey Airport); Alhassane Diallo (Meteorological Engineer, Burkina Faso Weather Service). The following three individuals were partly funded (for some of their airfare, accommodation, registration, meals) to participate in the Conference – Katiellou Lawan (International Relations, Niger Weather Service); Mamoutou Kouressy (Institute of Rural Economics, Niger Department of Agriculture); and Francis Dide (Benin Weather Service). I am confident that the participation of the above individuals in the Conference will facilitate both the smooth operation of the ARM Mobile Facility in Niamey during 2006 and the involvement of University of Niamey scientists in analysis of the data collected. We appreciate greatly this support from the ARM Program.« less
Calcine Waste Storage at the Idaho Nuclear Technology and Engineering Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staiger, Merle Daniel; M. C. Swenson
2005-01-01
This report documents an inventory of calcined waste produced at the Idaho Nuclear Technology and Engineering Center during the period from December 1963 to May 2000. The report was prepared based on calciner runs, operation of the calcined solids storage facilities, and miscellaneous operational information that establishes the range of chemical compositions of calcined waste stored at Idaho Nuclear Technology and Engineering Center. The report will be used to support obtaining permits for the calcined solids storage facilities, possible treatment of the calcined waste at the Idaho National Engineering and Environmental Laboratory, and to ship the waste to an off-sitemore » facility including a geologic repository. The information in this report was compiled from calciner operating data, waste solution analyses and volumes calcined, calciner operating schedules, calcine temperature monitoring records, and facility design of the calcined solids storage facilities. A compact disk copy of this report is provided to facilitate future data manipulations and analysis.« less
The quality of service in passenger transport terminals
NASA Astrophysics Data System (ADS)
Oprea, C.; Roşca, E.; Popa, M.; Ilie, A.; Dinu, O.; Roşca, M.
2016-11-01
The quality of service in transport terminals is differently perceived by engineers, economists, transport operators and sociologists. The traveler's perception is nevertheless decisive. The quality of service is well connected with the inside design of terminals, with the facilities in terminals and with the provided service standards. In order to provide a high level of service, the activities taking place in the public transport terminal and the maximum travelers flow size must be carefully analyzed and dimensioned. The purpose of modelling is to find the best route for each traveler from origin (entrance) to destination (exit) through all the intermediate service points, taking into consideration the instant network conditions. In developing the model we consider the walking, the waiting and the serving time. Using a simulation program written in ARENA we determine the waiting time. For validation, the model is used to evaluate the performance level in Bucharest Basarab station. By comparing the total walking distance for the possible routes and the utility function that describes the utility of all activities from entrance to exit we can find the optimal route.
2001-09-05
This final rule modifies the Medicaid upper payment (UPL) limit provisions by establishing a new transition period for States that submitted plan amendments before March 13, 2001 that do not comply with the new UPLs effective on that date (but do comply with the prior UPLs) and were approved on or after January 22, 2001. This new transition period applies to payments for inpatient hospital services, outpatient hospital services, nursing facility services, intermediate care facility services for the mentally retarded, and clinic services.
10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...
10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
Energy Systems | Argonne National Laboratory
Materials Engineering Research Facility Distributed Energy Research Center Engine Research Facility Heat Keeping the balance: How flexible nuclear operation can help add more wind and solar to the grid MIT News
Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility
NASA Technical Reports Server (NTRS)
Martin, Keith; Sen-Roy, Michael; Heiman, Jennifer
2009-01-01
Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).
42 CFR 440.150 - Intermediate care facility (ICF/MR) services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Intermediate care facility (ICF/MR) services. 440.150 Section 440.150 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS SERVICES: GENERAL PROVISIONS Definitions § 440.150 Intermediate care facility (ICF/MR) service...
Chao, Shirley Y; Dwyer, Johanna T; Houser, Robert F; Jacques, Paul; Tennstedt, Sharon
2008-10-01
There has been no consensus on best practices in food and nutrition services in assisted living facilities for older adults. We documented experts' views on optimal food and nutrition services emphases in assisted living facilities, and factors affecting their views. One hundred thirty-five national experts specializing in health, aging, nutrition and assisted living facilities completed a survey consisting four scenarios (ie, home-style, restaurant/hotel, and health/medical, and a combination of these three) in six food and nutrition services areas: dining room environment, meal services, meal quality, nutrition services, employees' qualifications, and therapeutic nutrition services. Sixty-three percent of experts favored the combination scenario. Dietetics education and experts' beliefs that assisted living facilities should be health promotion and maintenance facilities were significant predictors of emphases, including wellness considerations. Experts' personal views exerted a powerful influence. Experts chose food and nutrition service quality indicators that emphasized a focus on both wellness and amenities as their ideal scenarios for optimal food and nutrition services in assisted living facilities.
JSC Metal Finishing Waste Minimization Methods
NASA Technical Reports Server (NTRS)
Sullivan, Erica
2003-01-01
THe paper discusses the following: Johnson Space Center (JSC) has achieved VPP Star status and is ISO 9001 compliant. The Structural Engineering Division in the Engineering Directorate is responsible for operating the metal finishing facility at JSC. The Engineering Directorate is responsible for $71.4 million of space flight hardware design, fabrication and testing. The JSC Metal Finishing Facility processes flight hardware to support the programs in particular schedule and mission critical flight hardware. The JSC Metal Finishing Facility is operated by Rothe Joint Venture. The Facility provides following processes: anodizing, alodining, passivation, and pickling. JSC Metal Finishing Facility completely rebuilt in 1998. Total cost of $366,000. All new tanks, electrical, plumbing, and ventilation installed. Designed to meet modern safety, environmental, and quality requirements. Designed to minimize contamination and provide the highest quality finishes.
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2012 CFR
2012-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2013 CFR
2013-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2014 CFR
2014-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
16 CFR 240.7 - Services or facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Services or facilities. 240.7 Section 240.7 Commercial Practices FEDERAL TRADE COMMISSION GUIDES AND TRADE PRACTICE RULES GUIDES FOR ADVERTISING ALLOWANCES AND OTHER MERCHANDISING PAYMENTS AND SERVICES § 240.7 Services or facilities. The terms services...
42 CFR 413.53 - Determination of cost of services to beneficiaries.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING FACILITIES... paragraph (d) of this section.) Nursing facility (NF)-type services, formerly known as ICF and SNF-type...)(1) of the Act. Skilled nursing facility (SNF)-type services are routine services furnished by a...
2014-05-09
CAPE CANAVERAL, Fla. – Researchers prepare to activate the Veggie plant growth system inside a control chamber at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. From left, are George Guerra, quality control engineer, and Chuck Spern, lead project engineer, both with QinetiQ North America on the Engineering Services Contract. The growth chamber will be used as a control unit and procedures will be followed identical to those being performed on Veggie and the Veg-01 experiment on the International Space Station by Expedition 39 flight engineer and NASA astronaut Steve Swanson. Veggie and Veg-01 were delivered to the space station aboard the SpaceX-3 mission. Veggie is the first fresh food production system delivered to the station. Six plant pillows, each containing outredgeous red romaine lettuce seeds and a root mat were inserted into Veggie. The plant chamber's red, blue and green LED lights were activated. The plant growth will be monitored for 28 days. At the end of the cycle, the plants will be carefully harvested, frozen and stored for return to Earth. Photo credit: NASA/Dimitri Gerondidakis
Code of Federal Regulations, 2011 CFR
2011-07-01
... ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and..., survey, or check, the installation items required by this section. (a) The CVA or project engineer must... according to the Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-01-01
The purpose of this directory is to provide a listing of available U.S. coal and coal related resources to potential purchasers of those resources abroad. The directory lists business entities within the US which offer coal related resources, products and services for sale on the international market. Each listing is intended to describe the particular business niche or range of product and/or services offered by a particular company. The listing provides addresses, telephones, and telex/fax for key staff in each company committed to the facilitation of international trade. The content of each listing has been formulated especially for this directorymore » and reflects data current as of the date of this edition. The directory listings are divided into four primary classifications: coal resources; technology resources; support services; and financing and resource packaging. The first three of which are subdivided as follows: Coal Resources -- coal derivatives, coal exporters, and coal mining; Technology Resources -- advanced utilization, architects and engineers, boiler equipment, emissions control and waste disposal systems, facility construction, mining equipment, power generation systems, technical publications, and transport equipment; Support Services -- coal transport, facility operations, freight forwarders, sampling services and equipment, and technical consultants. Listings for the directory were solicited on the basis of this industry breakdown. Each of the four sections of this directory begins with a matrix illustrating which companies fall within the particular subclassifications specific to that main classification. A general alphabetical index of companies and an index by product/service classification are provided following the last section of the directory.« less
Power Quality and Reliability Project
NASA Technical Reports Server (NTRS)
Attia, John O.
2001-01-01
One area where universities and industry can link is in the area of power systems reliability and quality - key concepts in the commercial, industrial and public sector engineering environments. Prairie View A&M University (PVAMU) has established a collaborative relationship with the University of'Texas at Arlington (UTA), NASA/Johnson Space Center (JSC), and EP&C Engineering and Technology Group (EP&C) a small disadvantage business that specializes in power quality and engineering services. The primary goal of this collaboration is to facilitate the development and implementation of a Strategic Integrated power/Systems Reliability and Curriculum Enhancement Program. The objectives of first phase of this work are: (a) to develop a course in power quality and reliability, (b) to use the campus of Prairie View A&M University as a laboratory for the study of systems reliability and quality issues, (c) to provide students with NASA/EPC shadowing and Internship experience. In this work, a course, titled "Reliability Analysis of Electrical Facilities" was developed and taught for two semesters. About thirty seven has benefited directly from this course. A laboratory accompanying the course was also developed. Four facilities at Prairie View A&M University were surveyed. Some tests that were performed are (i) earth-ground testing, (ii) voltage, amperage and harmonics of various panels in the buildings, (iii) checking the wire sizes to see if they were the right size for the load that they were carrying, (iv) vibration tests to test the status of the engines or chillers and water pumps, (v) infrared testing to the test arcing or misfiring of electrical or mechanical systems.
Orion Service Module Umbilical (OSMU) Testing Complete
2016-10-19
Testing of the Orion Service Module Umbilical (OSMU) was completed at the Launch Equipment Test Facility at NASA’s Kennedy Space Center in Florida. The OSMU was attached to Vehicle Motion Simulator 1 for a series of simulated launch tests to validate it for installation on the mobile launcher. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. Kennedy's Engineering Directorate is providing support to the Ground Systems Development and Operations Program for testing of the OSMU. EM-1 is scheduled to launch in 2018.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-17
This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA03-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status, are listed in Table 1 - 1. The complete scope of work appears in Appendix.« less
42 CFR 416.61 - Scope of facility services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Scope of facility services. 416.61 Section 416.61 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES... are not limited to— (1) Nursing, technician, and related services; (2) Use of the facilities where the...
42 CFR 32.86 - Admissions to Service facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Admissions to Service facilities. 32.86 Section 32.86 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICAL CARE AND... Hansen's Disease § 32.86 Admissions to Service facilities. Any person with Hansen's disease who presents...
Altitude Test Cell in the Four Burner Area
1947-10-21
One of the two altitude simulating-test chambers in Engine Research Building at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The two chambers were collectively referred to as the Four Burner Area. NACA Lewis’ Altitude Wind Tunnel was the nation’s first major facility used for testing full-scale engines in conditions that realistically simulated actual flight. The wind tunnel was such a success in the mid-1940s that there was a backlog of engines waiting to be tested. The Four Burner chambers were quickly built in 1946 and 1947 to ease the Altitude Wind Tunnel’s congested schedule. The Four Burner Area was located in the southwest wing of the massive Engine Research Building, across the road from the Altitude Wind Tunnel. The two chambers were 10 feet in diameter and 60 feet long. The refrigeration equipment produced the temperatures and the exhauster equipment created the low pressures present at altitudes up to 60,000 feet. In 1947 the Rolls Royce Nene was the first engine tested in the new facility. The mechanic in this photograph is installing a General Electric J-35 engine. Over the next ten years, a variety of studies were conducted using the General Electric J-47 and Wright Aeronautical J-65 turbojets. The two test cells were occasionally used for rocket engines between 1957 and 1959, but other facilities were better suited to the rocket engine testing. The Four Burner Area was shutdown in 1959. After years of inactivity, the facility was removed from the Engine Research Building in late 1973 in order to create the High Temperature and Pressure Combustor Test Facility.
2012-06-16
Engineers to help identify and develop energy and water conservation projects in the facilities for which they are responsible. DISCLAIMER: The...and water throughout their facility. To identify energy and water conservation measures (ECMs), an energy manager would generally start by performing...an Energy and Water Conservation Assessment, essentially a facility-level evaluation of the en- ergy and water consuming equipment and systems that
42 CFR 31.3 - Use of Service facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Use of Service facilities. 31.3 Section 31.3 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICAL CARE AND EXAMINATIONS... Service § 31.3 Use of Service facilities. Except as otherwise provided in §§ 31.3 to 31.10, the persons...
ERIC Educational Resources Information Center
Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.
It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…