Sample records for facilities management system

  1. DKIST facility management system integration

    NASA Astrophysics Data System (ADS)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  2. Los Alamos Plutonium Facility Waste Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, K.; Montoya, A.; Wieneke, R.

    1997-02-01

    This paper describes the new computer-based transuranic (TRU) Waste Management System (WMS) being implemented at the Plutonium Facility at Los Alamos National Laboratory (LANL). The Waste Management System is a distributed computer processing system stored in a Sybase database and accessed by a graphical user interface (GUI) written in Omnis7. It resides on the local area network at the Plutonium Facility and is accessible by authorized TRU waste originators, count room personnel, radiation protection technicians (RPTs), quality assurance personnel, and waste management personnel for data input and verification. Future goals include bringing outside groups like the LANL Waste Management Facilitymore » on-line to participate in this streamlined system. The WMS is changing the TRU paper trail into a computer trail, saving time and eliminating errors and inconsistencies in the process.« less

  3. Computer-Aided Facilities Management Systems (CAFM).

    ERIC Educational Resources Information Center

    Cyros, Kreon L.

    Computer-aided facilities management (CAFM) refers to a collection of software used with increasing frequency by facilities managers. The six major CAFM components are discussed with respect to their usefulness and popularity in facilities management applications: (1) computer-aided design; (2) computer-aided engineering; (3) decision support…

  4. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  5. Drainage facility management system : final report, June 2009.

    DOT National Transportation Integrated Search

    2009-06-01

    This research project identified requirements for a drainage facility management system for the Oregon Department of Transportation. It also estimated the personnel resources needed to collect the inventory to populate such a system with data. A tota...

  6. Guidelines for Management Information Systems in Canadian Health Care Facilities

    PubMed Central

    Thompson, Larry E.

    1987-01-01

    The MIS Guidelines are a comprehensive set of standards for health care facilities for the recording of staffing, financial, workload, patient care and other management information. The Guidelines enable health care facilities to develop management information systems which identify resources, costs and products to more effectively forecast and control costs and utilize resources to their maximum potential as well as provide improved comparability of operations. The MIS Guidelines were produced by the Management Information Systems (MIS) Project, a cooperative effort of the federal and provincial governments, provincial hospital/health associations, under the authority of the Canadian Federal/Provincial Advisory Committee on Institutional and Medical Services. The Guidelines are currently being implemented on a “test” basis in ten health care facilities across Canada and portions integrated in government reporting as finalized.

  7. PIMS sequencing extension: a laboratory information management system for DNA sequencing facilities

    PubMed Central

    2011-01-01

    Background Facilities that provide a service for DNA sequencing typically support large numbers of users and experiment types. The cost of services is often reduced by the use of liquid handling robots but the efficiency of such facilities is hampered because the software for such robots does not usually integrate well with the systems that run the sequencing machines. Accordingly, there is a need for software systems capable of integrating different robotic systems and managing sample information for DNA sequencing services. In this paper, we describe an extension to the Protein Information Management System (PIMS) that is designed for DNA sequencing facilities. The new version of PIMS has a user-friendly web interface and integrates all aspects of the sequencing process, including sample submission, handling and tracking, together with capture and management of the data. Results The PIMS sequencing extension has been in production since July 2009 at the University of Leeds DNA Sequencing Facility. It has completely replaced manual data handling and simplified the tasks of data management and user communication. Samples from 45 groups have been processed with an average throughput of 10000 samples per month. The current version of the PIMS sequencing extension works with Applied Biosystems 3130XL 96-well plate sequencer and MWG 4204 or Aviso Theonyx liquid handling robots, but is readily adaptable for use with other combinations of robots. Conclusions PIMS has been extended to provide a user-friendly and integrated data management solution for DNA sequencing facilities that is accessed through a normal web browser and allows simultaneous access by multiple users as well as facility managers. The system integrates sequencing and liquid handling robots, manages the data flow, and provides remote access to the sequencing results. The software is freely available, for academic users, from http://www.pims-lims.org/. PMID:21385349

  8. PIMS sequencing extension: a laboratory information management system for DNA sequencing facilities.

    PubMed

    Troshin, Peter V; Postis, Vincent Lg; Ashworth, Denise; Baldwin, Stephen A; McPherson, Michael J; Barton, Geoffrey J

    2011-03-07

    Facilities that provide a service for DNA sequencing typically support large numbers of users and experiment types. The cost of services is often reduced by the use of liquid handling robots but the efficiency of such facilities is hampered because the software for such robots does not usually integrate well with the systems that run the sequencing machines. Accordingly, there is a need for software systems capable of integrating different robotic systems and managing sample information for DNA sequencing services. In this paper, we describe an extension to the Protein Information Management System (PIMS) that is designed for DNA sequencing facilities. The new version of PIMS has a user-friendly web interface and integrates all aspects of the sequencing process, including sample submission, handling and tracking, together with capture and management of the data. The PIMS sequencing extension has been in production since July 2009 at the University of Leeds DNA Sequencing Facility. It has completely replaced manual data handling and simplified the tasks of data management and user communication. Samples from 45 groups have been processed with an average throughput of 10000 samples per month. The current version of the PIMS sequencing extension works with Applied Biosystems 3130XL 96-well plate sequencer and MWG 4204 or Aviso Theonyx liquid handling robots, but is readily adaptable for use with other combinations of robots. PIMS has been extended to provide a user-friendly and integrated data management solution for DNA sequencing facilities that is accessed through a normal web browser and allows simultaneous access by multiple users as well as facility managers. The system integrates sequencing and liquid handling robots, manages the data flow, and provides remote access to the sequencing results. The software is freely available, for academic users, from http://www.pims-lims.org/.

  9. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  10. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  11. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  12. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  13. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  14. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  15. Waste management facility accident analysis (WASTE ACC) system: software for analysis of waste management alternatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohout, E.F.; Folga, S.; Mueller, C.

    1996-03-01

    This paper describes the Waste Management Facility Accident Analysis (WASTE{underscore}ACC) software, which was developed at Argonne National Laboratory (ANL) to support the US Department of Energy`s (DOE`s) Waste Management (WM) Programmatic Environmental Impact Statement (PEIS). WASTE{underscore}ACC is a decision support and database system that is compatible with Microsoft{reg_sign} Windows{trademark}. It assesses potential atmospheric releases from accidents at waste management facilities. The software provides the user with an easy-to-use tool to determine the risk-dominant accident sequences for the many possible combinations of process technologies, waste and facility types, and alternative cases described in the WM PEIS. In addition, its structure willmore » allow additional alternative cases and assumptions to be tested as part of the future DOE programmatic decision-making process. The WASTE{underscore}ACC system demonstrates one approach to performing a generic, systemwide evaluation of accident risks at waste management facilities. The advantages of WASTE{underscore}ACC are threefold. First, the software gets waste volume and radiological profile data that were used to perform other WM PEIS-related analyses directly from the WASTE{underscore}MGMT system. Second, the system allows for a consistent analysis across all sites and waste streams, which enables decision makers to understand more fully the trade-offs among various policy options and scenarios. Third, the system is easy to operate; even complex scenario runs are completed within minutes.« less

  16. Developing Mobile BIM/2D Barcode-Based Automated Facility Management System

    PubMed Central

    Chen, Yen-Pei

    2014-01-01

    Facility management (FM) has become an important topic in research on the operation and maintenance phase. Managing the work of FM effectively is extremely difficult owing to the variety of environments. One of the difficulties is the performance of two-dimensional (2D) graphics when depicting facilities. Building information modeling (BIM) uses precise geometry and relevant data to support the facilities depicted in three-dimensional (3D) object-oriented computer-aided design (CAD). This paper proposes a new and practical methodology with application to FM that uses an integrated 2D barcode and the BIM approach. Using 2D barcode and BIM technologies, this study proposes a mobile automated BIM-based facility management (BIMFM) system for FM staff in the operation and maintenance phase. The mobile automated BIMFM system is then applied in a selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FM practice. The combined results demonstrate that a BIMFM-like system can be an effective mobile automated FM tool. The advantage of the mobile automated BIMFM system lies not only in improving FM work efficiency for the FM staff but also in facilitating FM updates and transfers in the BIM environment. PMID:25250373

  17. Developing mobile BIM/2D barcode-based automated facility management system.

    PubMed

    Lin, Yu-Cheng; Su, Yu-Chih; Chen, Yen-Pei

    2014-01-01

    Facility management (FM) has become an important topic in research on the operation and maintenance phase. Managing the work of FM effectively is extremely difficult owing to the variety of environments. One of the difficulties is the performance of two-dimensional (2D) graphics when depicting facilities. Building information modeling (BIM) uses precise geometry and relevant data to support the facilities depicted in three-dimensional (3D) object-oriented computer-aided design (CAD). This paper proposes a new and practical methodology with application to FM that uses an integrated 2D barcode and the BIM approach. Using 2D barcode and BIM technologies, this study proposes a mobile automated BIM-based facility management (BIMFM) system for FM staff in the operation and maintenance phase. The mobile automated BIMFM system is then applied in a selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FM practice. The combined results demonstrate that a BIMFM-like system can be an effective mobile automated FM tool. The advantage of the mobile automated BIMFM system lies not only in improving FM work efficiency for the FM staff but also in facilitating FM updates and transfers in the BIM environment.

  18. Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.

    1985-01-01

    The Cryogenic Fluid Management Facility is a reusable test bed which is designed to be carried within the Shuttle cargo bay to investigate the systems and technologies associated with the efficient management of cryogens in space. Cryogenic fluid management consists of the systems and technologies for: (1) liquid storage and supply, including capillary acquisition/expulsion systems which provide single-phase liquid to the user system, (2) both passive and active thermal control systems, and (3) fluid transfer/resupply systems, including transfer lines and receiver tanks. The facility contains a storage and supply tank, a transfer line and a receiver tank, configured to provide low-g verification of fluid and thermal models of cryogenic storage and transfer processes. The facility will provide design data and criteria for future subcritical cryogenic storage and transfer system applications, such as Space Station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, and ground-based and space-based orbit transfer vehicles (OTV).

  19. Developing mobile- and BIM-based integrated visual facility maintenance management system.

    PubMed

    Lin, Yu-Cheng; Su, Yu-Chih

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  20. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    PubMed Central

    Su, Yu-Chih

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool. PMID:24227995

  1. Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.; Symons, E. P.; Kroeger, E. W.

    1984-01-01

    The Cryogenic Fluid Management Facility (CFMF) is a reusable test bed which is designed to be carried into space in the Shuttle cargo bay to investigate systems and technologies required to efficiently and effectively manage cryogens in space. The facility hardware is configured to provide low-g verification of fluid and thermal models of cryogenic storage, transfer concepts and processes. Significant design data and criteria for future subcritical cryogenic storage and transfer systems will be obtained. Future applications include space-based and ground-based orbit transfer vehicles (OTV), space station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, space-based weapon systems and space-based orbit maneuvering vehicles (OMV). This paper describes the facility and discusses the cryogenic fluid management technology to be investigated. A brief discussion of the integration issues involved in loading and transporting liquid hydrogen within the Shuttle cargo bay is also included.

  2. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  3. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  4. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  5. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  6. 14 CFR 1212.702 - Associate Administrator for Management Systems and Facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Associate Administrator for Management Systems and Facilities. 1212.702 Section 1212.702 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.702 Associate...

  7. 14 CFR 1212.702 - Associate Administrator for Management Systems and Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Associate Administrator for Management Systems and Facilities. 1212.702 Section 1212.702 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PRIVACY ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.702 Associate...

  8. Waste receiving and processing facility module 1 data management system software project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  9. Cost Implications of an Interim Storage Facility in the Waste Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  10. EPA Facility Registry System (FRS): NEPT

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry System (FRS) for the subset of facilities that link to the National Environmental Performance Track (NEPT) Program dataset. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs

  11. Data Management Facility Operations Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  12. Screensaver: an open source lab information management system (LIMS) for high throughput screening facilities

    PubMed Central

    2010-01-01

    Background Shared-usage high throughput screening (HTS) facilities are becoming more common in academe as large-scale small molecule and genome-scale RNAi screening strategies are adopted for basic research purposes. These shared facilities require a unique informatics infrastructure that must not only provide access to and analysis of screening data, but must also manage the administrative and technical challenges associated with conducting numerous, interleaved screening efforts run by multiple independent research groups. Results We have developed Screensaver, a free, open source, web-based lab information management system (LIMS), to address the informatics needs of our small molecule and RNAi screening facility. Screensaver supports the storage and comparison of screening data sets, as well as the management of information about screens, screeners, libraries, and laboratory work requests. To our knowledge, Screensaver is one of the first applications to support the storage and analysis of data from both genome-scale RNAi screening projects and small molecule screening projects. Conclusions The informatics and administrative needs of an HTS facility may be best managed by a single, integrated, web-accessible application such as Screensaver. Screensaver has proven useful in meeting the requirements of the ICCB-Longwood/NSRB Screening Facility at Harvard Medical School, and has provided similar benefits to other HTS facilities. PMID:20482787

  13. Screensaver: an open source lab information management system (LIMS) for high throughput screening facilities.

    PubMed

    Tolopko, Andrew N; Sullivan, John P; Erickson, Sean D; Wrobel, David; Chiang, Su L; Rudnicki, Katrina; Rudnicki, Stewart; Nale, Jennifer; Selfors, Laura M; Greenhouse, Dara; Muhlich, Jeremy L; Shamu, Caroline E

    2010-05-18

    Shared-usage high throughput screening (HTS) facilities are becoming more common in academe as large-scale small molecule and genome-scale RNAi screening strategies are adopted for basic research purposes. These shared facilities require a unique informatics infrastructure that must not only provide access to and analysis of screening data, but must also manage the administrative and technical challenges associated with conducting numerous, interleaved screening efforts run by multiple independent research groups. We have developed Screensaver, a free, open source, web-based lab information management system (LIMS), to address the informatics needs of our small molecule and RNAi screening facility. Screensaver supports the storage and comparison of screening data sets, as well as the management of information about screens, screeners, libraries, and laboratory work requests. To our knowledge, Screensaver is one of the first applications to support the storage and analysis of data from both genome-scale RNAi screening projects and small molecule screening projects. The informatics and administrative needs of an HTS facility may be best managed by a single, integrated, web-accessible application such as Screensaver. Screensaver has proven useful in meeting the requirements of the ICCB-Longwood/NSRB Screening Facility at Harvard Medical School, and has provided similar benefits to other HTS facilities.

  14. XML Based Scientific Data Management Facility

    NASA Technical Reports Server (NTRS)

    Mehrotra, Piyush; Zubair, M.; Ziebartt, John (Technical Monitor)

    2001-01-01

    The World Wide Web consortium has developed an Extensible Markup Language (XML) to support the building of better information management infrastructures. The scientific computing community realizing the benefits of HTML has designed markup languages for scientific data. In this paper, we propose a XML based scientific data management facility, XDMF. The project is motivated by the fact that even though a lot of scientific data is being generated, it is not being shared because of lack of standards and infrastructure support for discovering and transforming the data. The proposed data management facility can be used to discover the scientific data itself, the transformation functions, and also for applying the required transformations. We have built a prototype system of the proposed data management facility that can work on different platforms. We have implemented the system using Java, and Apache XSLT engine Xalan. To support remote data and transformation functions, we had to extend the XSLT specification and the Xalan package.

  15. XML Based Scientific Data Management Facility

    NASA Technical Reports Server (NTRS)

    Mehrotra, P.; Zubair, M.; Bushnell, Dennis M. (Technical Monitor)

    2002-01-01

    The World Wide Web consortium has developed an Extensible Markup Language (XML) to support the building of better information management infrastructures. The scientific computing community realizing the benefits of XML has designed markup languages for scientific data. In this paper, we propose a XML based scientific data management ,facility, XDMF. The project is motivated by the fact that even though a lot of scientific data is being generated, it is not being shared because of lack of standards and infrastructure support for discovering and transforming the data. The proposed data management facility can be used to discover the scientific data itself, the transformation functions, and also for applying the required transformations. We have built a prototype system of the proposed data management facility that can work on different platforms. We have implemented the system using Java, and Apache XSLT engine Xalan. To support remote data and transformation functions, we had to extend the XSLT specification and the Xalan package.

  16. Microvax-based data management and reduction system for the regional planetary image facilities

    NASA Technical Reports Server (NTRS)

    Arvidson, R.; Guinness, E.; Slavney, S.; Weiss, B.

    1987-01-01

    Presented is a progress report for the Regional Planetary Image Facilities (RPIF) prototype image data management and reduction system being jointly implemented by Washington University and the USGS, Flagstaff. The system will consist of a MicroVAX with a high capacity (approx 300 megabyte) disk drive, a compact disk player, an image display buffer, a videodisk player, USGS image processing software, and SYSTEM 1032 - a commercial relational database management package. The USGS, Flagstaff, will transfer their image processing software including radiometric and geometric calibration routines, to the MicroVAX environment. Washington University will have primary responsibility for developing the database management aspects of the system and for integrating the various aspects into a working system.

  17. A facility location model for municipal solid waste management system under uncertain environment.

    PubMed

    Yadav, Vinay; Bhurjee, A K; Karmakar, Subhankar; Dikshit, A K

    2017-12-15

    In municipal solid waste management system, decision makers have to develop an insight into the processes namely, waste generation, collection, transportation, processing, and disposal methods. Many parameters (e.g., waste generation rate, functioning costs of facilities, transportation cost, and revenues) in this system are associated with uncertainties. Often, these uncertainties of parameters need to be modeled under a situation of data scarcity for generating probability distribution function or membership function for stochastic mathematical programming or fuzzy mathematical programming respectively, with only information of extreme variations. Moreover, if uncertainties are ignored, then the problems like insufficient capacities of waste management facilities or improper utilization of available funds may be raised. To tackle uncertainties of these parameters in a more efficient manner an algorithm, based on interval analysis, has been developed. This algorithm is applied to find optimal solutions for a facility location model, which is formulated to select economically best locations of transfer stations in a hypothetical urban center. Transfer stations are an integral part of contemporary municipal solid waste management systems, and economic siting of transfer stations ensures financial sustainability of this system. The model is written in a mathematical programming language AMPL with KNITRO as a solver. The developed model selects five economically best locations out of ten potential locations with an optimum overall cost of [394,836, 757,440] Rs. 1 /day ([5906, 11,331] USD/day) approximately. Further, the requirement of uncertainty modeling is explained based on the results of sensitivity analysis. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. Trends in Facility Management Technology: The Emergence of the Internet, GIS, and Facility Assessment Decision Support.

    ERIC Educational Resources Information Center

    Teicholz, Eric

    1997-01-01

    Reports research on trends in computer-aided facilities management using the Internet and geographic information system (GIS) technology for space utilization research. Proposes that facility assessment software holds promise for supporting facility management decision making, and outlines four areas for its use: inventory; evaluation; reporting;…

  19. Bureau of Indian Affairs Schools: New Facilities Management Information System Promising, but Improved Data Accuracy Needed.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    A General Accounting Office (GAO) study evaluated the Bureau of Indian Affairs' (BIA) new facilities management information system (FMIS). Specifically, the study examined whether the new FMIS addresses the old system's weaknesses and meets BIA's management needs, whether BIA has finished validating the accuracy of data transferred from the old…

  20. Evaluation of Facility Management by Multivariate Statistics - Factor Analysis

    NASA Astrophysics Data System (ADS)

    Singovszki, Miloš; Vranayová, Zuzana

    2013-06-01

    Facility management is evolving, there is no exact than other sciences, although its development is fast forward. The knowledge and practical skills in facility management is not replaced, on the contrary, they complement each other. The existing low utilization of science in the field of facility management is mainly caused by the management of support activities are many variables and prevailing immediate reaction to the extraordinary situation arising from motives of those who have substantial experience and years of proven experience. Facility management is looking for a system that uses organized knowledge and will form the basis, which grows from a wide range of disciplines. Significant influence on its formation as a scientific discipline is the "structure, which follows strategy". The paper deals evaluate technology building as part of an facility management by multivariate statistic - factor analysis.

  1. The use of an automated flight test management system in the development of a rapid-prototyping flight research facility

    NASA Technical Reports Server (NTRS)

    Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.

    1988-01-01

    An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.

  2. Evaluation of a hybrid paper-electronic medication management system at a residential aged care facility.

    PubMed

    Elliott, Rohan A; Lee, Cik Yin; Hussainy, Safeera Y

    2016-06-01

    Objectives The aims of the study were to investigate discrepancies between general practitioners' paper medication orders and pharmacy-prepared electronic medication administration charts, back-up paper charts and dose-administration aids, as well as delays between prescribing, charting and administration, at a 90-bed residential aged care facility that used a hybrid paper-electronic medication management system. Methods A cross-sectional audit of medication orders, medication charts and dose-administration aids was performed to identify discrepancies. In addition, a retrospective audit was performed of delays between prescribing and availability of an updated electronic medication administration chart. Medication administration records were reviewed retrospectively to determine whether discrepancies and delays led to medication administration errors. Results Medication records for 88 residents (mean age 86 years) were audited. Residents were prescribed a median of eight regular medicines (interquartile range 5-12). One hundred and twenty-five discrepancies were identified. Forty-seven discrepancies, affecting 21 (24%) residents, led to a medication administration error. The most common discrepancies were medicine omission (44.0%) and extra medicine (19.2%). Delays from when medicines were prescribed to when they appeared on the electronic medication administration chart ranged from 18min to 98h. On nine occasions (for 10% of residents) the delay contributed to missed doses, usually antibiotics. Conclusion Medication discrepancies and delays were common. Improved systems for managing medication orders and charts are needed. What is known about the topic? Hybrid paper-electronic medication management systems, in which prescribers' orders are transcribed into an electronic system by pharmacy technicians and pharmacists to create medication administration charts, are increasingly replacing paper-based medication management systems in Australian residential aged care

  3. The ICCB Computer Based Facilities Inventory & Utilization Management Information Subsystem.

    ERIC Educational Resources Information Center

    Lach, Ivan J.

    The Illinois Community College Board (ICCB) Facilities Inventory and Utilization subsystem, a part of the ICCB management information system, was designed to provide decision makers with needed information to better manage the facility resources of Illinois community colleges. This subsystem, dependent upon facilities inventory data and course…

  4. EPA Facility Registry System (FRS): NCES

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry System (FRS) for the subset of facilities that link to the National Center for Education Statistics (NCES). The primary federal database for collecting and analyzing data related to education in the United States and other Nations, NCES is located in the U.S. Department of Education, within the Institute of Education Sciences. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA00e2??s national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NCES school facilities once the NCES data has been integrated into the FRS database. Additional information on FRS is available at the EPA website http://www.epa.gov/enviro/html/fii/index.html.

  5. Facility Management's Role in Organizational Sustainability

    ERIC Educational Resources Information Center

    Adams, Gregory K.

    2013-01-01

    Facility managers have questions about sustainability. How do an organization's physical facilities--its built environment--and the management of them, influence the sustainability of the organization or institution as a whole? How important is Facility Management (FM) to the overall sustainability profile of an organization? Facility managers…

  6. A novel microgrid demand-side management system for manufacturing facilities

    NASA Astrophysics Data System (ADS)

    Harper, Terance J.

    Thirty-one percent of annual energy consumption in the United States occurs within the industrial sector, where manufacturing processes account for the largest amount of energy consumption and carbon emissions. For this reason, energy efficiency in manufacturing facilities is increasingly important for reducing operating costs and improving profits. Using microgrids to generate local sustainable power should reduce energy consumption from the main utility grid along with energy costs and carbon emissions. Also, microgrids have the potential to serve as reliable energy generators in international locations where the utility grid is often unstable. For this research, a manufacturing process that had approximately 20 kW of peak demand was matched with a solar photovoltaic array that had a peak output of approximately 3 KW. An innovative Demand-Side Management (DSM) strategy was developed to manage the process loads as part of this smart microgrid system. The DSM algorithm managed the intermittent nature of the microgrid and the instantaneous demand of the manufacturing process. The control algorithm required three input signals; one from the microgrid indicating the availability of renewable energy, another from the manufacturing process indicating energy use as a percent of peak production, and historical data for renewable sources and facility demand. Based on these inputs the algorithm had three modes of operation: normal (business as usual), curtailment (shutting off non-critical loads), and energy storage. The results show that a real-time management of a manufacturing process with a microgrid will reduce electrical consumption and peak demand. The renewable energy system for this research was rated to provide up to 13% of the total manufacturing capacity. With actively managing the process loads with the DSM program alone, electrical consumption from the utility grid was reduced by 17% on average. An additional 24% reduction was accomplished when the microgrid

  7. A facility monitoring system: The single most valuable and cost-effective tool available to an energy manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holmes, W.A.

    Energy engineering and management combines engineering problem-solving and financial management techniques to reduce utility costs. At present, substantial amounts of time and money are being spent in order to attempt to quantify energy consumption and costs and define opportunities for savings. Unfortunately, accurate verification of results is often overlooked. Advances in technology during the last few years have made the installation of a permanent, PC-based monitoring system possible for any facility, often for no more than the cost of a detailed study. By investing initially in a monitoring system rather than audits or studies, the actual consumption and cost datamore » will be available on a continuing basis and can be used to produce immediate operational savings, more accurately analyze opportunities requiring capital investments, and to verify actual savings resulting from changes. A permanent monitoring system, installed as the first step in a utility cost reduction effort, to identify where and how energy is used in a facility on a dynamic and real-time basis, can provide the most valuable and cost-effective tool available to an energy manager. The resulting data allows energy consumption patterns and utility costs to be understood and managed in the same manner as all other costs within a facility.« less

  8. Capital Ideas for Facilities Management.

    ERIC Educational Resources Information Center

    Golding, Stephen T.; Gordon, Janet; Gravina, Arthur

    2001-01-01

    Asserting that just like chief financial officers, higher education facilities specialists must maximize the long-term performance of assets under their care, describes strategies for strategic facilities management. Discusses three main approaches to facilities management (insourcing, cosourcing, and outsourcing) and where boards of trustees fit…

  9. Facilities Data System Manual.

    ERIC Educational Resources Information Center

    Acridge, Charles W.; Ford, Tim M.

    The purposes of this manual are to set forth the scope and procedures for the maintenance and operation of the University of California facilities Data System (FDX) and to serve as a reference document for users of the system. FDX is an information system providing planning and management data about the existing physical plant. That is, it…

  10. 41 CFR 102-74.10 - What is the basic facility management policy?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the basic facility management policy? 102-74.10 Section 102-74.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY...

  11. A Study on Governance and Human Resources for Cooperative Road Facilities Management

    NASA Astrophysics Data System (ADS)

    Ohno, Sachiko; Takagi, Akiyoshi; Kurauchi, Fumitaka; Demura, Yoshifumi

    Within today's infrastructure management, Asset Management systems are becoming a mainstream feature. For region where the risk is low, it is necessary to create a "cooperative road facilities management system". This research both examined and suggested what kind of cooperative road facilities management system should be promoted by the regional society. Concretely, this study defines the operational realities of a previous case. It discusses the problem of the road facilities management as a governance. Furthermore, its realization depends on "the cooperation between municipalities", "the private-sector initiative", and "residents participation" .Also, it discusses the problem of human resources for governance. Its realization depends on "the engineers' promotion", and "creation of a voluntary activity of the resident" as a human resources. Moreover, it defines that the intermediary is important because the human resources tied to the governance. As a result, the prospect of the road facilities management is shown by the role of the player and the relation among player.

  12. MicroArray Facility: a laboratory information management system with extended support for Nylon based technologies.

    PubMed

    Honoré, Paul; Granjeaud, Samuel; Tagett, Rebecca; Deraco, Stéphane; Beaudoing, Emmanuel; Rougemont, Jacques; Debono, Stéphane; Hingamp, Pascal

    2006-09-20

    High throughput gene expression profiling (GEP) is becoming a routine technique in life science laboratories. With experimental designs that repeatedly span thousands of genes and hundreds of samples, relying on a dedicated database infrastructure is no longer an option.GEP technology is a fast moving target, with new approaches constantly broadening the field diversity. This technology heterogeneity, compounded by the informatics complexity of GEP databases, means that software developments have so far focused on mainstream techniques, leaving less typical yet established techniques such as Nylon microarrays at best partially supported. MAF (MicroArray Facility) is the laboratory database system we have developed for managing the design, production and hybridization of spotted microarrays. Although it can support the widely used glass microarrays and oligo-chips, MAF was designed with the specific idiosyncrasies of Nylon based microarrays in mind. Notably single channel radioactive probes, microarray stripping and reuse, vector control hybridizations and spike-in controls are all natively supported by the software suite. MicroArray Facility is MIAME supportive and dynamically provides feedback on missing annotations to help users estimate effective MIAME compliance. Genomic data such as clone identifiers and gene symbols are also directly annotated by MAF software using standard public resources. The MAGE-ML data format is implemented for full data export. Journalized database operations (audit tracking), data anonymization, material traceability and user/project level confidentiality policies are also managed by MAF. MicroArray Facility is a complete data management system for microarray producers and end-users. Particular care has been devoted to adequately model Nylon based microarrays. The MAF system, developed and implemented in both private and academic environments, has proved a robust solution for shared facilities and industry service providers alike.

  13. MicroArray Facility: a laboratory information management system with extended support for Nylon based technologies

    PubMed Central

    Honoré, Paul; Granjeaud, Samuel; Tagett, Rebecca; Deraco, Stéphane; Beaudoing, Emmanuel; Rougemont, Jacques; Debono, Stéphane; Hingamp, Pascal

    2006-01-01

    Background High throughput gene expression profiling (GEP) is becoming a routine technique in life science laboratories. With experimental designs that repeatedly span thousands of genes and hundreds of samples, relying on a dedicated database infrastructure is no longer an option. GEP technology is a fast moving target, with new approaches constantly broadening the field diversity. This technology heterogeneity, compounded by the informatics complexity of GEP databases, means that software developments have so far focused on mainstream techniques, leaving less typical yet established techniques such as Nylon microarrays at best partially supported. Results MAF (MicroArray Facility) is the laboratory database system we have developed for managing the design, production and hybridization of spotted microarrays. Although it can support the widely used glass microarrays and oligo-chips, MAF was designed with the specific idiosyncrasies of Nylon based microarrays in mind. Notably single channel radioactive probes, microarray stripping and reuse, vector control hybridizations and spike-in controls are all natively supported by the software suite. MicroArray Facility is MIAME supportive and dynamically provides feedback on missing annotations to help users estimate effective MIAME compliance. Genomic data such as clone identifiers and gene symbols are also directly annotated by MAF software using standard public resources. The MAGE-ML data format is implemented for full data export. Journalized database operations (audit tracking), data anonymization, material traceability and user/project level confidentiality policies are also managed by MAF. Conclusion MicroArray Facility is a complete data management system for microarray producers and end-users. Particular care has been devoted to adequately model Nylon based microarrays. The MAF system, developed and implemented in both private and academic environments, has proved a robust solution for shared facilities and

  14. Health and Safety Management for Small-scale Methane Fermentation Facilities

    NASA Astrophysics Data System (ADS)

    Yamaoka, Masaru; Yuyama, Yoshito; Nakamura, Masato; Oritate, Fumiko

    In this study, we considered health and safety management for small-scale methane fermentation facilities that treat 2-5 ton of biomass daily based on several years operation experience with an approximate capacity of 5 t·d-1. We also took account of existing knowledge, related laws and regulations. There are no qualifications or licenses required for management and operation of small-scale methane fermentation facilities, even though rural sewerage facilities with a relative similar function are required to obtain a legitimate license. Therefore, there are wide variations in health and safety consciousness of the operators of small-scale methane fermentation facilities. The industrial safety and health laws are not applied to the operation of small-scale methane fermentation facilities. However, in order to safely operate a small-scale methane fermentation facility, the occupational safety and health management system that the law recommends should be applied. The aims of this paper are to clarify the risk factors in small-scale methane fermentation facilities and encourage planning, design and operation of facilities based on health and safety management.

  15. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  16. Managing Inventory At A Transitional Facility

    NASA Technical Reports Server (NTRS)

    Hutchins, Henry A.

    1993-01-01

    Kennedy Inventory Management System, KIMS, geared to needs of facility in transition from research and development to manufacturing. Operated jointly by several contractors at Kennedy Space Center, KIMS designed to reduce cost and increase efficiency of fabrication and maintenance of spaceflight hardware.

  17. Healthcare waste management: current practices in selected healthcare facilities, Botswana.

    PubMed

    Mbongwe, Bontle; Mmereki, Baagi T; Magashula, Andrew

    2008-01-01

    Healthcare waste management continues to present an array of challenges for developing countries, and Botswana is no exception. The possible impact of healthcare waste on public health and the environment has received a lot of attention such that Waste Management dedicated a special issue to the management of healthcare waste (Healthcare Wastes Management, 2005. Waste Management 25(6) 567-665). As the demand for more healthcare facilities increases, there is also an increase on waste generation from these facilities. This situation requires an organised system of healthcare waste management to curb public health risks as well as occupational hazards among healthcare workers as a result of poor waste management. This paper reviews current waste management practices at the healthcare facility level and proposes possible options for improvement in Botswana.

  18. 7 CFR 210.13 - Facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Facilities management. 210.13 Section 210.13... Participation § 210.13 Facilities management. Link to an amendment published at 74 FR 66216, Dec. 15, 2009. (a..., the added text is set forth as follows: § 210.13 Facilities management. (c) Food safety program. The...

  19. New Ideas on Facilities Management.

    ERIC Educational Resources Information Center

    Grimm, James C.

    1986-01-01

    Examines trends in facilities management relating to products and people. Reviews new trends in products, including processes, techniques, and programs that are being expounded by business and industry. Discusses the "people factors" involved in facilities management. (ABB)

  20. Professional Development through Organizational Assessment: Using APPA's Facilities Management Evaluation Program

    ERIC Educational Resources Information Center

    Medlin, E. Lander; Judd, R. Holly

    2013-01-01

    APPA's Facilities Management Evaluation Program (FMEP) provides an integrated system to optimize organizational performance. The criteria for evaluation not only provide a tool for organizational continuous improvement, they serve as a compelling leadership development tool essential for today's facilities management professional. The senior…

  1. Development of an integrated transuranic waste management system for a large research facility: NUCEF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mineo, Hideaki; Matsumura, Tatsuro; Takeshita, Isao

    1997-03-01

    The Nuclear Fuel Cycle Safety Engineering Research Facility (NUCEF) is a large complex of research facilities where transuranic (TRU) elements are used. Liquid and solid waste containing TRU elements is generated mainly in the treatment of fuel for critical experiments and in the research of reprocessing and TRU waste management in hot cells and glove boxes. The rational management of TRU wastes is a very important issue not only for NUCEF but also for Japan. An integrated TRU waste management system is being developed with NUCEF as the test bed. The basic policy for establishing the system is to classifymore » wastes by TRU concentration, to reduce waste volume, and to maximize reuse of TRU elements. The principal approach of the development program is to apply the outcomes of the research carried out in NUCEF. Key technologies are TRU measurement for classification of solid wastes and TRU separation and volume reduction for organic and aqueous wastes. Some technologies required for treating the wastes specific to the research activities in NUCEF need further development. Specifically, the separation and stabilization technologies for americium recovery from concentrated aqueous waste, which is generated in dissolution of mixed oxide when preparing fuel for critical experiments, needs further research.« less

  2. Facility Management as a Way of Reducing Costs in Transport Companies

    NASA Astrophysics Data System (ADS)

    Matusova, Dominika; Gogolova, Martina

    2017-10-01

    For facility management exists a several interpretations. These interpretations emerged progressively. At the time of the notion of facility management was designed to manage an administrative building, in the United States (US). They can ensure their operation and maintenance. From the US, this trend is further moved to Europe and now it start becoming a current and actual topic also in Slovakia. Facility management is contractually agreed scheme of services, semantically recalls traditional building management. There by finally pushed for activities related to real estates. For facility management is fundamental - certification and certification systems. Therefore, is essential to know, the cost structure of certification. The most commonly occurring austerity measures include: heat pumps, use of renewable energy, solar panels and water savings. These measures can reduce the cost.

  3. [Implementation of quality management in medical rehabilitation--current challenges for rehabilitation facilities].

    PubMed

    Enge, M; Koch, A; Müller, T; Vorländer, T

    2010-12-01

    The legal responsibilities imposed upon rehabilitation facilities under section 20 (2a) SGB IX, necessitate fundamental decisions to be taken regarding the development of quality management systems over and above the existing framework. This article is intended to provide ideas and suggestions to assist rehabilitation facilities in implementing a quality management system, which is required in addition to participation in the quality assurance programmes stipulated by the rehabilitation carriers. In this context, the additional internal benefit a functioning quality management system can provide for ensuring a high level of quality and for maintaining the competitiveness of the rehabilitation facility should be taken into account. The core element of these observations, hence, is a list of requirements which enables assessment of the quality of consultants' performance in setting up a quality management system. © Georg Thieme Verlag KG Stuttgart · New York.

  4. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  5. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov Websites

    Management Facilities Vehicle Thermal Management Facilities Image of a building with two semi truck evaluation facilities to develop advanced thermal management technologies for vehicles. Vehicle Testing and apparatus. Combined fluid loops bench research apparatus in the Vehicle Thermal Management Laboratory. Photo

  6. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  7. The Future of Facilities Management.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    1997-01-01

    Reports on a conference of college facility managers at which facilities professionals identified forces affecting the profession's future in five areas (information technology, resource scarcity, societal changes, government role in education, environmental deterioration) and six important roles for the manager (operational efficiency expert,…

  8. Innovation characteristics and intention to adopt sustainable facilities management practices.

    PubMed

    Lee, So Young; Kang, Mihyun

    2013-01-01

    Sustainable facilities management (SFM) is important because typical buildings consume more resources and energy than necessary, negatively impact the environment and generate lots of waste (US Department of Energy, 2003, Green Buildings). This study examined innovation characteristics that relate to facility managers' intention to adopt SFM practices. Based on the diffusion of innovations theory (Rogers 1962, 1995, Diffusion of Innovations. 4th ed. New York: The Free Press), an SFM innovation and adoption model was proposed. A survey was conducted with a convenience sample of 240 public facilities managers in 25 facilities management divisions in Seoul, Korea, and its metropolitan areas. Structural equation modelling was employed to analyse the data. The results showed that economic advantage and human comfort aspects are predictors for the intention of SFM adoption. Observability is positively relevant to the intention of SFM adoption. Complexity, however, is not a significant predictor for the intention of SFM adoption. Practical implications for sustainable products and systems and the built environment are suggested. To incorporate an innovation like sustainable practices, it is required to meet the needs of potential adopters. Innovation characteristics that influence facility managers' intention to adopt sustainable facilities management were examined. A survey was conducted. Economic advantage, human comfort and observability are predictors for the intention of adoption of sustainable practice.

  9. New Trends in Facility Asset Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2000-01-01

    Explains new, positive trends in facility asset management that encompasses greater acceptance and involvement of facility managers in the financial planning process, greater awareness of the need for maintenance, and facility administrators taking a greater role with business officers. The new climate for alternative renewal financing proposals…

  10. Description of the PMAD systems test bed facility and data system

    NASA Technical Reports Server (NTRS)

    Trase, Larry; Fong, Don; Adkins, Vicki; Birchenough, Arthur

    1992-01-01

    The power management and distribution (PMAD) systems test bed facility, including the power sources and loads available, is discussed, and the PMAD data system (PDS) is described. The PDS controls the test-bed facility hardware, and monitors and records the electric power system control data bus and external data. The PDS architecture is discussed, and each of the subsystems is described.

  11. 40 CFR 792.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Testing facility management. 792.31... facility management. For each study, testing facility management shall: (a) Designate a study director as... appropriately tested for identity, strength, purity, stability, and uniformity, as applicable. (e) Assure that...

  12. The European HST Science Data Archive. [and Data Management Facility (DMF)

    NASA Technical Reports Server (NTRS)

    Pasian, F.; Pirenne, B.; Albrecht, R.; Russo, G.

    1993-01-01

    The paper describes the European HST Science Data Archive. Particular attention is given to the flow from the HST spacecraft to the Science Data Archive at the Space Telescope European Coordinating Facility (ST-ECF); the archiving system at the ST-ECF, including the hardware and software system structure; the operations at the ST-ECF and differences with the Data Management Facility; and the current developments. A diagram of the logical structure and data flow of the system managing the European HST Science Data Archive is included.

  13. 40 CFR 160.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Testing facility management. 160.31... GOOD LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.31 Testing facility management. For each study, testing facility management shall: (a) Designate a study director as described in § 160.33...

  14. Rapid assessment of infrastructure of primary health care facilities - a relevant instrument for health care systems management.

    PubMed

    Scholz, Stefan; Ngoli, Baltazar; Flessa, Steffen

    2015-05-01

    Health care infrastructure constitutes a major component of the structural quality of a health system. Infrastructural deficiencies of health services are reported in literature and research. A number of instruments exist for the assessment of infrastructure. However, no easy-to-use instruments to assess health facility infrastructure in developing countries are available. Present tools are not applicable for a rapid assessment by health facility staff. Therefore, health information systems lack data on facility infrastructure. A rapid assessment tool for the infrastructure of primary health care facilities was developed by the authors and pilot-tested in Tanzania. The tool measures the quality of all infrastructural components comprehensively and with high standardization. Ratings use a 2-1-0 scheme which is frequently used in Tanzanian health care services. Infrastructural indicators and indices are obtained from the assessment and serve for reporting and tracing of interventions. The tool was pilot-tested in Tanga Region (Tanzania). The pilot test covered seven primary care facilities in the range between dispensary and district hospital. The assessment encompassed the facilities as entities as well as 42 facility buildings and 80 pieces of technical medical equipment. A full assessment of facility infrastructure was undertaken by health care professionals while the rapid assessment was performed by facility staff. Serious infrastructural deficiencies were revealed. The rapid assessment tool proved a reliable instrument of routine data collection by health facility staff. The authors recommend integrating the rapid assessment tool in the health information systems of developing countries. Health authorities in a decentralized health system are thus enabled to detect infrastructural deficiencies and trace the effects of interventions. The tool can lay the data foundation for district facility infrastructure management.

  15. Mitigating risks related to facilities management.

    PubMed

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  16. 18. Topside facility, interior of facility manager's room, view towards ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Topside facility, interior of facility manager's room, view towards west. Lyon - Whiteman Air Force Base, Oscar O-1 Minuteman Missile Alert Facility, Southeast corner of Twelfth & Vendenberg Avenues, Knob Noster, Johnson County, MO

  17. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    NASA Astrophysics Data System (ADS)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  18. Integrated waste management system costs in a MPC system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Supko, E.M.

    1995-12-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility.

  19. 20 CFR 638.303 - Site selection and facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Site selection and facilities management. 638... Facilities Management § 638.303 Site selection and facilities management. (a) The Job Corps Director shall... center, facilities engineering and real estate management will be conducted by the Job Corps Director or...

  20. Scope of Work for Integration Management and Installation Services of the National Ignition Facility Beampath Infrastructure System

    NASA Astrophysics Data System (ADS)

    Coyle, P. D.

    2000-03-01

    The goal of the National Ignition Facility (NIF) project is to provide an above ground experimental capability for maintaining nuclear competence and weapons effects simulation and to provide a facility capable of achieving fusion ignition using solid-state lasers as the energy driver. The facility will incorporate 192 laser beams, which will be focused onto a small target located at the center of a spherical target chamber-the energy from the laser beams will be deposited in a few billionths of a second. The target will then implode, forcing atomic nuclei to sufficiently high temperatures and densities necessary to achieve a miniature fusion reaction. The NIF is under construction, at Livermore, California, located approximately 50 miles southeast of San Francisco, California. The University of California, Lawrence Livermore National Laboratory (LLNL), operating under Prime Contract W-7405-ENG. 48 with the U.S. Department of Energy (DOE), shall subcontract for Integration Management and Installation (IMI) Services for the Beampath Infrastructure System (BIS). The BIS includes Beampath Hardware and Beampath Utilities. Conventional Facilities work for the NIF Laser and Target Area Building (LTAB) and Optics Assembly Building (OAB) is over 86 percent constructed. This Scope of Work is for Integration Management and Installation (IMI) Services corresponding to Management Services, Design Integration Services, Construction Services, and Commissioning Services for the NIB BIS. The BIS includes Beampath Hardware and Beampath Utilities. Beampath Hardware and Beampath Utilities include beampath vessels, enclosures, and beam tubes; auxiliary and utility systems; and support structures. A substantial amount of GFE will be provided by the University for installation as part of the infrastructure packages.

  1. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  2. [Road map for health and safety management systems in healthcare facilities, according to the OHSAS 18001:2007 standard].

    PubMed

    Pugliese, F; Albini, E; Serio, O; Apostoli, P

    2011-01-01

    The 81/2008 Act has defined a model of a health and safety management system that can contribute to prevent the occupational health and safety risks. We have developed the structure of a health and safety management system model and the necessary tools for its implementation in health care facilities. The realization of a model is structured in various phases: initial review, safety policy, planning, implementation, monitoring, management review and continuous improvement. Such a model, in continuous evolution, is based on the responsibilities of the different corporate characters and on an accurate analysis of risks and involved norms.

  3. Does identity shape leadership and management practice? Experiences of PHC facility managers in Cape Town, South Africa

    PubMed Central

    Daire, Judith; Gilson, Lucy

    2014-01-01

    In South Africa, as elsewhere, Primary Health Care (PHC) facilities are managed by professional nurses. Little is known about the dimensions and challenges of their job, or what influences their managerial practice. Drawing on leadership and organizational theory, this study explored what the job of being a PHC manager entails, and what factors influence their managerial practice. We specifically considered whether the appointment of professional nurses as facility managers leads to an identity transition, from nurse to manager. The overall intention was to generate ideas about how to support leadership development among PHC facility managers. Adopting case study methodology, the primary researcher facilitated in-depth discussions (about their personal history and managerial experiences) with eight participating facility managers from one geographical area. Other data were collected through in-depth interviews with key informants, document review and researcher field notes/journaling. Analysis involved data triangulation, respondent and peer review and cross-case analysis. The experiences show that the PHC facility manager’s job is dominated by a range of tasks and procedures focused on clinical service management, but is expected to encompass action to address the population and public health needs of the surrounding community. Managing with and through others, and in a complex system, requiring self-management, are critical aspects of the job. A range of personal, professional and contextual factors influence managerial practice, including professional identity. The current largely facility-focused management practice reflects the strong nursing identity of managers and broader organizational influences. However, three of the eight managers appear to self-identify an emerging leadership identity and demonstrate related managerial practices. Nonetheless, there is currently limited support for an identity transition towards leadership in this context. Better

  4. Does PDC Belong in Facilities Management?

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  5. 21 CFR 58.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Testing facility management. 58.31 Section 58.31... management. For each nonclinical laboratory study, testing facility management shall: (a) Designate a study... appropriately tested for identity, strength, purity, stability, and uniformity, as applicable. (e) Assure that...

  6. Risk Management Technique for design and operation of facilities and equipment

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  7. Does identity shape leadership and management practice? Experiences of PHC facility managers in Cape Town, South Africa.

    PubMed

    Daire, Judith; Gilson, Lucy

    2014-09-01

    In South Africa, as elsewhere, Primary Health Care (PHC) facilities are managed by professional nurses. Little is known about the dimensions and challenges of their job, or what influences their managerial practice. Drawing on leadership and organizational theory, this study explored what the job of being a PHC manager entails, and what factors influence their managerial practice. We specifically considered whether the appointment of professional nurses as facility managers leads to an identity transition, from nurse to manager. The overall intention was to generate ideas about how to support leadership development among PHC facility managers. Adopting case study methodology, the primary researcher facilitated in-depth discussions (about their personal history and managerial experiences) with eight participating facility managers from one geographical area. Other data were collected through in-depth interviews with key informants, document review and researcher field notes/journaling. Analysis involved data triangulation, respondent and peer review and cross-case analysis. The experiences show that the PHC facility manager's job is dominated by a range of tasks and procedures focused on clinical service management, but is expected to encompass action to address the population and public health needs of the surrounding community. Managing with and through others, and in a complex system, requiring self-management, are critical aspects of the job. A range of personal, professional and contextual factors influence managerial practice, including professional identity. The current largely facility-focused management practice reflects the strong nursing identity of managers and broader organizational influences. However, three of the eight managers appear to self-identify an emerging leadership identity and demonstrate related managerial practices. Nonetheless, there is currently limited support for an identity transition towards leadership in this context. Better

  8. Work Smarter Not Harder: Utilizing an Environmental Management Information System to Meet Regulatory Compliance and Reporting Requirements for a Major Source Title V Facility

    DTIC Science & Technology

    2011-05-10

    Environmental Management Information System to Meet Regulatory Compliance and Reporting Requirements for a Major Source Title V Facility. Tannis Danley...AND SUBTITLE Work Smarter Not Harder: Utilizing an Environmental Management Information System to Meet Regulatory Compliance and Reporting...Carson) – EMS (Hawaii Garrison, West Virginia National Guard) Environmental Management Information System (EMIS) National Defense Center for Energy and

  9. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  10. Automated flight test management system

    NASA Technical Reports Server (NTRS)

    Hewett, M. D.; Tartt, D. M.; Agarwal, A.

    1991-01-01

    The Phase 1 development of an automated flight test management system (ATMS) as a component of a rapid prototyping flight research facility for artificial intelligence (AI) based flight concepts is discussed. The ATMS provides a flight engineer with a set of tools that assist in flight test planning, monitoring, and simulation. The system is also capable of controlling an aircraft during flight test by performing closed loop guidance functions, range management, and maneuver-quality monitoring. The ATMS is being used as a prototypical system to develop a flight research facility for AI based flight systems concepts at NASA Ames Dryden.

  11. 21 CFR 58.31 - Testing facility management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Organization and Personnel § 58.31 Testing facility management. For each nonclinical laboratory study, testing facility management shall: (a) Designate a study...

  12. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  13. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  14. 41 CFR 102-72.40 - What are facility management delegations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are facility management delegations? 102-72.40 Section 102-72.40 Public Contracts and Property Management Federal Property... AUTHORITY Delegation of Authority § 102-72.40 What are facility management delegations? Facility management...

  15. 25 CFR 170.807 - What must BIA include when it develops an IRR Transportation Facilities Maintenance Management...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facilities Maintenance Management System? 170.807 Section 170.807 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.807 What must BIA include when it develops an IRR Transportation Facilities Maintenance Management System...

  16. Workflow management in large distributed systems

    NASA Astrophysics Data System (ADS)

    Legrand, I.; Newman, H.; Voicu, R.; Dobre, C.; Grigoras, C.

    2011-12-01

    The MonALISA (Monitoring Agents using a Large Integrated Services Architecture) framework provides a distributed service system capable of controlling and optimizing large-scale, data-intensive applications. An essential part of managing large-scale, distributed data-processing facilities is a monitoring system for computing facilities, storage, networks, and the very large number of applications running on these systems in near realtime. All this monitoring information gathered for all the subsystems is essential for developing the required higher-level services—the components that provide decision support and some degree of automated decisions—and for maintaining and optimizing workflow in large-scale distributed systems. These management and global optimization functions are performed by higher-level agent-based services. We present several applications of MonALISA's higher-level services including optimized dynamic routing, control, data-transfer scheduling, distributed job scheduling, dynamic allocation of storage resource to running jobs and automated management of remote services among a large set of grid facilities.

  17. Assessment of laboratory logistics management information system practice for HIV/AIDS and tuberculosis laboratory commodities in selected public health facilities in Addis Ababa, Ethiopia.

    PubMed

    Desale, Adino; Taye, Bineyam; Belay, Getachew; Nigatu, Alemayehu

    2013-01-01

    Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. A cross-sectional descriptive study was conducted from September 2010-January 2011 at selected public health facilities. A stratified random sampling method was used to include a total of 43 facilities which, were investigated through quantitative methods using structured questionnaires interviews. Focus group discussion with the designated supply chain managers and key informant interviews were conducted for the qualitative method. There exists a well-designed logistics system for laboratory commodities with trained pharmacy personnel, distributed standard LMIS formats and established inventory control procedures. However, majority of laboratory professionals were not trained in LMIS. Majority of the facilities (60.5%) were stocked out for at least one ART monitoring and TB laboratory reagents and the highest stock out rate was for chemistry reagents. Expired ART monitoring laboratory commodities were found in 25 (73.5%) of facilities. Fifty percent (50%) of the assessed hospitals and 54% of health centers were currently using stock/bin cards for all HIV/AIDS and TB laboratory commodities in main pharmacy store, among these only 25% and 20.8% of them were updated with accurate information matching with the physical count done at the time of visit for hospitals and health centers respectively. Even though there exists a well designed laboratory LMIS, keeping quality stock/bin cards and LMIS reports were very low. Key ART monitoring laboratory commodities were stock out at many facilities at the day of visit and during the past six months. Based on findings, training of laboratory personnel's managing laboratory commodities and keeping accurate inventory control procedures

  18. Assessment of laboratory logistics management information system practice for HIV/AIDS and tuberculosis laboratory commodities in selected public health facilities in Addis Ababa, Ethiopia

    PubMed Central

    Desale, Adino; Taye, Bineyam; Belay, Getachew; Nigatu, Alemayehu

    2013-01-01

    Introduction Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. Methods A cross-sectional descriptive study was conducted from September 2010-January 2011 at selected public health facilities. A stratified random sampling method was used to include a total of 43 facilities which, were investigated through quantitative methods using structured questionnaires interviews. Focus group discussion with the designated supply chain managers and key informant interviews were conducted for the qualitative method. Results There exists a well-designed logistics system for laboratory commodities with trained pharmacy personnel, distributed standard LMIS formats and established inventory control procedures. However, majority of laboratory professionals were not trained in LMIS. Majority of the facilities (60.5%) were stocked out for at least one ART monitoring and TB laboratory reagents and the highest stock out rate was for chemistry reagents. Expired ART monitoring laboratory commodities were found in 25 (73.5%) of facilities. Fifty percent (50%) of the assessed hospitals and 54% of health centers were currently using stock/bin cards for all HIV/AIDS and TB laboratory commodities in main pharmacy store, among these only 25% and 20.8% of them were updated with accurate information matching with the physical count done at the time of visit for hospitals and health centers respectively. Conclusion Even though there exists a well designed laboratory LMIS, keeping quality stock/bin cards and LMIS reports were very low. Key ART monitoring laboratory commodities were stock out at many facilities at the day of visit and during the past six months. Based on findings, training of laboratory personnel's managing laboratory commodities and keeping

  19. Exploring how different modes of governance act across health system levels to influence primary healthcare facility managers' use of information in decision-making: experience from Cape Town, South Africa.

    PubMed

    Scott, Vera; Gilson, Lucy

    2017-09-15

    Governance, which includes decision-making at all levels of the health system, and information have been identified as key, interacting levers of health system strengthening. However there is an extensive literature detailing the challenges of supporting health managers to use formal information from health information systems (HISs) in their decision-making. While health information needs differ across levels of the health system there has been surprisingly little empirical work considering what information is actually used by primary healthcare facility managers in managing, and making decisions about, service delivery. This paper, therefore, specifically examines experience from Cape Town, South Africa, asking the question: How is primary healthcare facility managers' use of information for decision-making influenced by governance across levels of the health system? The research is novel in that it both explores what information these facility managers actually use in decision-making, and considers how wider governance processes influence this information use. An academic researcher and four facility managers worked as co-researchers in a multi-case study in which three areas of management were served as the cases. There were iterative cycles of data collection and collaborative analysis with individual and peer reflective learning over a period of three years. Central governance shaped what information and knowledge was valued - and, therefore, generated and used at lower system levels. The central level valued formal health information generated in the district-based HIS which therefore attracted management attention across the levels of the health system in terms of design, funding and implementation. This information was useful in the top-down practices of planning and management of the public health system. However, in facilities at the frontline of service delivery, there was a strong requirement for local, disaggregated information and experiential

  20. The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.; Levin, Kerry M.; Rowe, Dennis W.

    2001-01-01

    The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

  1. Safety Management for Water Play Facilities.

    ERIC Educational Resources Information Center

    Thompson, Claude

    1986-01-01

    Modern aquatic facilities, which include wave pools, water slides, and shallow water activity play pools, have a greater potential for injuries and lawsuits than conventional swimming pools. This article outlines comprehensive safety management for such facilities, including potential accident identification and injury control planning. (MT)

  2. Insect pest management decisions in food processing facilities

    USDA-ARS?s Scientific Manuscript database

    Pest management decision making in food processing facilities such as flour mills, rice mills, human and pet food manufacturing facilities, distribution centers and warehouses, and retail stores is a challenging undertaking. Insect pest management programs require an understanding of the food facili...

  3. An Application of Business Process Management to Health Care Facilities.

    PubMed

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  4. Facilities Management: A Program for the 1980s.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…

  5. Asset Management: Roof Maintenance and Facility Energy Retrofits

    DTIC Science & Technology

    2012-03-01

    vapor low emission coatings. Floor finishes completed in ceramic stone tile were the most efficient floor coverings. Fixed insulated fiberglass window...been coined Asset Management which utilizes organizational levels of service, business case analysis, and risk analysis to address urgent...Force have left a number of facility systems such as roofs at risk to disrepair due to a lack of maintenance. Under the principles of asset

  6. Energy Systems Integration Facility Control Room | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees

  7. Energy management system optimization for on-site facility staff - a case history of the New York State Office of Mental Health

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bagdon, M.J.; Martin, P.J.

    1997-06-01

    In 1994, Novus Engineering and EME Group began a project for the New York State Office of Mental Health (OMH) to maximize the use and benefit of energy management systems (EMS) installed at various large psychiatric hospitals throughout New York State. The project, which was funded and managed by the Dormitory Authority of the State of New York (DASNY), had three major objectives: (1) Maximize Energy Savings - Novus staff quickly learned that EMS systems as set up by contractors are far from optimal for generating energy savings. This part of the program revealed numerous opportunities for increased energy savings,more » such as: fine tuning proportional/integral/derivative (PID) loops to eliminate valve and damper hunting; adjusting temperature reset schedules to reduce energy consumption and provide more uniform temperature conditions throughout the facilities; and modifying equipment schedules. (2) Develop Monitoring Protocols - Large EMS systems are so complex that they require a systematic approach to daily, monthly and seasonal monitoring of building system conditions in order to locate system problems before they turn into trouble calls or equipment failures. In order to assist local facility staff in their monitoring efforts, Novus prepared user-friendly handbooks on each EMS. These included monitoring protocols tailored to each facility. (3) Provide Staff Training - When a new EMS is installed at a facility, it is frequently the maintenance staffs first exposure to a complex computerized system. Without proper training in what to look for, staff use of the EMS is generally very limited. With proper training, staff can be taught to take a pro-active approach to identify and solve problems before they get out of hand. The staff then realize that the EMS is a powerful preventative maintenance tool that can be used to make their work more effective and efficient. Case histories are presented.« less

  8. [Security Management in Clinical Laboratory Departments and Facilities: Current Status and Issues].

    PubMed

    Ishida, Haku; Nakamura, Junji; Yoshida, Hiroshi; Koike, Masaru; Inoue, Yuji

    2014-11-01

    We conducted a questionnaire survey regarding the current activities for protecting patients' privacy and the security of information systems (IS) related to the clinical laboratory departments of university hospitals, certified training facilities for clinical laboratories, and general hospitals in Yamaguchi Prefecture. The response rate was 47% from 215 medical institutions, including three commercial clinical laboratory centers. The results showed that there were some differences in management activities among facilities with respect to continuing education, the documentation or regulation of operational management for paper records, electronic information, remaining samples, genetic testing, and laboratory information for secondary use. They were suggested to be caused by differences in functions between university and general hospitals, differences in the scale of hospitals, or whether or not hospitals have received accreditation or ISO 15189. Regarding the IS, although the majority of facilities had sufficiently employed the access control to IS, there was some room for improvement in the management of special cases such as VIPs and patients with HIV infection. Furthermore, there were issues regarding the login method for computers shared by multiple staff, the showing of the names of personnel in charge of reports, and the risks associated with direct connections to systems and the Internet and the use of portable media such as USB memory sticks. These results indicated that further efforts are necessary for each facility to continue self-assessment and make improvements.

  9. Management challenges faced by managers of New Zealand long-term care facilities.

    PubMed

    Madas, E; North, N

    2000-01-01

    This article reports on a postal survey of 78 long-term care managers in one region of New Zealand, of whom 45 (58%) responded. Most long-term care managers (73.2%) were middle-aged females holding nursing but not management qualifications. Most long-term care facilities (69%) tended to be stand-alone facilities providing a single type of care (rest home or continuing care hospital). The most prominent issues facing managers were considered to be inadequate funding to match the growing costs of providing long-term care and occupancy levels. Managers believed that political/regulatory, economic and social factors influenced these issues. Despite a turbulent health care environment and the challenges facing managers, long-term care managers reported they were coping well and valued networking.

  10. Providing security for automated process control systems at hydropower engineering facilities

    NASA Astrophysics Data System (ADS)

    Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.

    2016-12-01

    This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.

  11. Centrifuge facility conceptual system study. Volume 2: Facility systems and study summary

    NASA Technical Reports Server (NTRS)

    Synnestvedt, Robert (Editor); Blair, Patricia; Cartledge, Alan; Garces-Porcile, Jorge; Garin, Vladimir; Guerrero, Mike; Haddeland, Peter; Horkachuck, Mike; Kuebler, Ulrich; Nguyen, Frank

    1991-01-01

    The Centrifuge Facility is a major element of the biological research facility for the implementation of NASA's Life Science Research Program on Space Station Freedom using nonhuman species (small primates, rodents, plants, insects, cell tissues, etc.). The Centrifuge Facility consists of a variable gravity Centrifuge to provide artificial gravity up to 2 earth G's' a Holding System to maintain specimens at microgravity levels, a Glovebox, and a Service Unit for servicing specimen chambers. The following subject areas are covered: (1) Holding System; (2) Centrifuge System; (3) Glovebox System; (4) Service System; and (5) system study summary.

  12. Nike Facility Diagnostics and Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Chan, Yung; Aglitskiy, Yefim; Karasik, Max; Kehne, David; Obenschain, Steve; Oh, Jaechul; Serlin, Victor; Weaver, Jim

    2013-10-01

    The Nike laser-target facility is a 56-beam krypton fluoride system that can deliver 2 to 3 kJ of laser energy at 248 nm onto targets inside a two meter diameter vacuum chamber. Nike is used to study physics and technology issues related to laser direct-drive ICF fusion, including hydrodynamic and laser-plasma instabilities, material behavior at extreme pressures, and optical and x-ray diagnostics for laser-heated targets. A suite of laser and target diagnostics are fielded on the Nike facility, including high-speed, high-resolution x-ray and visible imaging cameras, spectrometers and photo-detectors. A centrally-controlled, distributed computerized data acquisition system provides robust data management and near real-time analysis feedback capability during target shots. Work supported by DOE/NNSA.

  13. Biosecurity measures in 48 isolation facilities managing highly infectious diseases.

    PubMed

    Puro, Vincenzo; Fusco, Francesco M; Schilling, Stefan; Thomson, Gail; De Iaco, Giuseppina; Brouqui, Philippe; Maltezou, Helena C; Bannister, Barbara; Gottschalk, René; Brodt, Hans-Rheinhard; Ippolito, Giuseppe

    2012-06-01

    Biosecurity measures are traditionally applied to laboratories, but they may also be usefully applied in highly specialized clinical settings, such as the isolation facilities for the management of patients with highly infectious diseases (eg, viral hemorrhagic fevers, SARS, smallpox, potentially severe pandemic flu, and MDR- and XDR-tuberculosis). In 2009 the European Network for Highly Infectious Diseases conducted a survey in 48 isolation facilities in 16 European countries to determine biosecurity measures for access control to the facility. Security personnel are present in 39 facilities (81%). In 35 facilities (73%), entrance to the isolation area is restricted; control methods include electronic keys, a PIN system, closed-circuit TV, and guards at the doors. In 25 facilities (52%), identification and registration of all staff entering and exiting the isolation area are required. Access control is used in most surveyed centers, but specific lacks exist in some facilities. Further data are needed to assess other biosecurity aspects, such as the security measures during the transportation of potentially contaminated materials and measures to address the risk of an "insider attack."

  14. Biosecurity Measures in 48 Isolation Facilities Managing Highly Infectious Diseases

    PubMed Central

    Puro, Vincenzo; Schilling, Stefan; Thomson, Gail; De Iaco, Giuseppina; Brouqui, Philippe; Maltezou, Helena C.; Bannister, Barbara; Gottschalk, René; Brodt, Hans-Rheinhard; Ippolito, Giuseppe

    2012-01-01

    Biosecurity measures are traditionally applied to laboratories, but they may also be usefully applied in highly specialized clinical settings, such as the isolation facilities for the management of patients with highly infectious diseases (eg, viral hemorrhagic fevers, SARS, smallpox, potentially severe pandemic flu, and MDR- and XDR-tuberculosis). In 2009 the European Network for Highly Infectious Diseases conducted a survey in 48 isolation facilities in 16 European countries to determine biosecurity measures for access control to the facility. Security personnel are present in 39 facilities (81%). In 35 facilities (73%), entrance to the isolation area is restricted; control methods include electronic keys, a PIN system, closed-circuit TV, and guards at the doors. In 25 facilities (52%), identification and registration of all staff entering and exiting the isolation area are required. Access control is used in most surveyed centers, but specific lacks exist in some facilities. Further data are needed to assess other biosecurity aspects, such as the security measures during the transportation of potentially contaminated materials and measures to address the risk of an “insider attack.” PMID:22571373

  15. Strategies for healthcare facilities, construction, and real estate management.

    PubMed

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  16. Software Manages Documentation in a Large Test Facility

    NASA Technical Reports Server (NTRS)

    Gurneck, Joseph M.

    2001-01-01

    The 3MCS computer program assists and instrumentation engineer in performing the 3 essential functions of design, documentation, and configuration management of measurement and control systems in a large test facility. Services provided by 3MCS are acceptance of input from multiple engineers and technicians working at multiple locations;standardization of drawings;automated cross-referencing; identification of errors;listing of components and resources; downloading of test settings; and provision of information to customers.

  17. Integrated Facilities Management and Fixed Asset Accounting.

    ERIC Educational Resources Information Center

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  18. 7 CFR 205.271 - Facility pest management practice standard.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Facility pest management practice standard. 205.271... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED... Requirements § 205.271 Facility pest management practice standard. (a) The producer or handler of an organic...

  19. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  20. {open_quotes}Radon{close_quotes} - the system of Soviet designed regional waste management facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Horak, W.C.; Reisman, A.; Purvis, E.E. III

    1997-07-01

    The Soviet Union established a system of specialized regional facilities to dispose of radioactive waste generated by sources other than the nuclear fuel cycle. The system had 16 facilities in Russia, 5 in Ukraine, one in each of the other CIS states, and one in each of the Baltic Republics. These facilities are still being used. The major generators of radioactive waste they process these are research and industrial organizations, medical and agricultural institution and other activities not related to nuclear power. Waste handled by these facilities is mainly beta- and gamma-emitting nuclides with half lives of less than 30more » years. The long-lived and alpha-emitting isotopic content is insignificant. Most of the radwaste has low and medium radioactivity levels. The facilities also handle spent radiation sources, which are highly radioactive and contain 95-98 percent of the activity of all the radwaste buried at these facilities.« less

  1. Managing geometric information with a data base management system

    NASA Technical Reports Server (NTRS)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  2. Utilization Management in Department of Defense Military Treatment Facilities

    DTIC Science & Technology

    1992-07-01

    Health Affairs) Mendez (1992) clearly states that his plan is for the military health services system’s quality assessment and criteria to become more...also worthy of note that second surgical opinions are not part of Assistant Secretary of Defense (Health Affairs) Mendez ’ (1992) memonrandur on...Affairs) Mendez ’ (1992) quality management policy already states that military medical treatment facilities will begin to implement utilization

  3. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  4. A framework for managing core facilities within the research enterprise.

    PubMed

    Haley, Rand

    2009-09-01

    Core facilities represent increasingly important operational and strategic components of institutions' research enterprises, especially in biomolecular science and engineering disciplines. With this realization, many research institutions are placing more attention on effectively managing core facilities within the research enterprise. A framework is presented for organizing the questions, challenges, and opportunities facing core facilities and the academic units and institutions in which they operate. This framework is intended to assist in guiding core facility management discussions in the context of a portfolio of facilities and within the overall institutional research enterprise.

  5. Research notes : drainage facility asset management : more than an inventory of pipes.

    DOT National Transportation Integrated Search

    2007-04-01

    The primary objectives for the research project were twofold: 1) To develop and implement an Oregon-specific system for inventorying and evaluating the condition of pipes, culverts, and stormwater facilities based on the FHWA Culvert Management Syste...

  6. Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Morris, Jon; Turowski, Mark; Franzl, Richard; Walker, Mark; Kapadia, Ravi; Venkatesh, Meera; Schmalzel, John

    2010-01-01

    Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1

  7. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  8. Exploring Space Management Goals in Institutional Care Facilities in China

    PubMed Central

    Zhang, Jiankun

    2017-01-01

    Space management has been widely examined in commercial facilities, educational facilities, and hospitals but not in China's institutional care facilities. Poor spatial arrangements, such as wasted space, dysfunctionality, and environment mismanagement, are increasing; in turn, the occupancy rate is decreasing due to residential dissatisfaction. To address these problems, this paper's objective is to explore the space management goals (SMGs) in institutional care facilities in China. Systematic literature analysis was adopted to set SMGs' principles, to identify nine theoretical SMGs, and to develop the conceptual model of SMGs for institutional care facilities. A total of 19 intensive interviews were conducted with stakeholders in seven institutional care facilities to collect data for qualitative analysis. The qualitative evidence was analyzed through open coding, axial coding, and selective coding. As a result, six major categories as well as their interrelationships were put forward to visualize the path diagram for exploring SMGs in China's institutional care facilities. Furthermore, seven expected SMGs that were explored from qualitative evidence were confirmed as China's SMGs in institutional care facilities by a validation test. Finally, a gap analysis among theoretical SMGs and China's SMGs provided recommendations for implementing space management in China's institutional care facilities. PMID:29065629

  9. Exploring Space Management Goals in Institutional Care Facilities in China.

    PubMed

    Li, Lingzhi; Yuan, Jingfeng; Ning, Yan; Shao, Qiuhu; Zhang, Jiankun

    2017-01-01

    Space management has been widely examined in commercial facilities, educational facilities, and hospitals but not in China's institutional care facilities. Poor spatial arrangements, such as wasted space, dysfunctionality, and environment mismanagement, are increasing; in turn, the occupancy rate is decreasing due to residential dissatisfaction. To address these problems, this paper's objective is to explore the space management goals (SMGs) in institutional care facilities in China. Systematic literature analysis was adopted to set SMGs' principles, to identify nine theoretical SMGs, and to develop the conceptual model of SMGs for institutional care facilities. A total of 19 intensive interviews were conducted with stakeholders in seven institutional care facilities to collect data for qualitative analysis. The qualitative evidence was analyzed through open coding, axial coding, and selective coding. As a result, six major categories as well as their interrelationships were put forward to visualize the path diagram for exploring SMGs in China's institutional care facilities. Furthermore, seven expected SMGs that were explored from qualitative evidence were confirmed as China's SMGs in institutional care facilities by a validation test. Finally, a gap analysis among theoretical SMGs and China's SMGs provided recommendations for implementing space management in China's institutional care facilities.

  10. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  11. Development and validation of the crew-station system-integration research facility

    NASA Technical Reports Server (NTRS)

    Nedell, B.; Hardy, G.; Lichtenstein, T.; Leong, G.; Thompson, D.

    1986-01-01

    The various issues associated with the use of integrated flight management systems in aircraft were discussed. To address these issues a fixed base integrated flight research (IFR) simulation of a helicopter was developed to support experiments that contribute to the understanding of design criteria for rotorcraft cockpits incorporating advanced integrated flight management systems. A validation experiment was conducted that demonstrates the main features of the facility and the capability to conduct crew/system integration research.

  12. Forum Guide to Facilities Information Management: A Resource for State and Local Education Agencies. NFES 2012-808

    ERIC Educational Resources Information Center

    National Forum on Education Statistics, 2012

    2012-01-01

    Safe and secure facilities that foster learning are crucial to providing quality education services, and developing and maintaining these facilities requires considerable resources and organization. Facility information systems allow education organizations to collect and manage data that can be used to inform and guide decisionmaking about the…

  13. 41 CFR 102-74.15 - What are the facility management responsibilities of occupant agencies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the facility management responsibilities of occupant agencies? 102-74.15 Section 102-74.15 Public Contracts and Property... PROPERTY 74-FACILITY MANAGEMENT Facility Management § 102-74.15 What are the facility management...

  14. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  15. Data management integration for biomedical core facilities

    NASA Astrophysics Data System (ADS)

    Zhang, Guo-Qiang; Szymanski, Jacek; Wilson, David

    2007-03-01

    We present the design, development, and pilot-deployment experiences of MIMI, a web-based, Multi-modality Multi-Resource Information Integration environment for biomedical core facilities. This is an easily customizable, web-based software tool that integrates scientific and administrative support for a biomedical core facility involving a common set of entities: researchers; projects; equipments and devices; support staff; services; samples and materials; experimental workflow; large and complex data. With this software, one can: register users; manage projects; schedule resources; bill services; perform site-wide search; archive, back-up, and share data. With its customizable, expandable, and scalable characteristics, MIMI not only provides a cost-effective solution to the overarching data management problem of biomedical core facilities unavailable in the market place, but also lays a foundation for data federation to facilitate and support discovery-driven research.

  16. Case management for the subacute patient in a skilled nursing facility.

    PubMed

    Carr, D D

    2000-01-01

    The goal of case management has always been to manage care, cost, and outcomes. The Balanced Budget Act of 1997 and the subsequent implementation of managed care and the prospective payment system have introduced many challenges to the postacute care delivery system. The implementation of sound clinical, fiscal, and operational strategies is critical to the continued delivery of quality services and the maximization of revenue. The implementation of case management principles provides an opportunity to balance care with cost. This article focuses on the development and implementation of a case management program at a skilled nursing facility that specifically addresses the needs of a subacute population. The program's purpose is to promote efficiency, efficacy, and effectiveness of services for short-term subacute patients who will eventually return to the community. The long-term goal of the program is to classify all patients into case management categories and assign them to RN case managers or social workers, based on acuity and need.

  17. An SSH key management system: easing the pain of managing key/user/account associations

    NASA Astrophysics Data System (ADS)

    Arkhipkin, D.; Betts, W.; Lauret, J.; Shiryaev, A.

    2008-07-01

    Cyber security requirements for secure access to computing facilities often call for access controls via gatekeepers and the use of two-factor authentication. Using SSH keys to satisfy the two factor authentication requirement has introduced a potentially challenging task of managing the keys and their associations with individual users and user accounts. Approaches for a facility with the simple model of one remote user corresponding to one local user would not work at facilities that require a many-to-many mapping between users and accounts on multiple systems. We will present an SSH key management system we developed, tested and deployed to address the many-to-many dilemma in the environment of the STAR experiment. We will explain its use in an online computing context and explain how it makes possible the management and tracing of group account access spread over many sub-system components (data acquisition, slow controls, trigger, detector instrumentation, etc.) without the use of shared passwords for remote logins.

  18. A guideline for interpersonal capabilities enhancement to support sustainable facility management practice

    NASA Astrophysics Data System (ADS)

    Sarpin, Norliana; Kasim, Narimah; Zainal, Rozlin; Noh, Hamidun Mohd

    2018-04-01

    Facility management is the key phase in the development cycle of an assets and spans over a considerable length of time. Therefore, facility managers are in a commanding position to maximise the potential of sustainability through the development phases from construction, operation, maintenance and upgrade leading to decommission and deconstruction. Sustainability endeavours in facility management practices will contribute to reducing energy consumption, waste and running costs. Furthermore, it can also help in improving organisational productivity, financial return and community standing of the organisation. Facility manager should be empowered with the necessary knowledge and capabilities at the forefront facing sustainability challenge. However, literature studies show a gap between the level of awareness, specific knowledge and the necessary skills required to pursue sustainability in the facility management professional. People capability is considered as the key enabler in managing the sustainability agenda as well as being central to the improvement of competency and innovation in an organisation. This paper aims to develop a guidelines for interpersonal capabilities to support sustainability in facility management practice. Starting with a total of 7 critical interpersonal capabilities factors identified from previous questionnaire survey, the authors conducted an interview with 3 experts in facility management to assess the perceived importance of these factors. The findings reveal a set of guidelines for the enhancement of interpersonal capabilities among facility managers by providing what can be done to acquire these factors and how it can support the application of sustainability in their practice. The findings of this paper are expected to form the basis of a mechanism framework developed to equip facility managers with the right knowledge, to continue education and training and to develop new mind-sets to enhance the implementation of sustainability

  19. Energy System Integration Facility Secure Data Center | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Energy System Integration Facility Secure Data Center Energy System Integration Facility Secure Data Center The Energy Systems Integration Facility's Secure Data Center provides

  20. Resident's concerns and attitudes towards Solid Waste Management facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rahardyan, B.; Matsuto, T.; Kakuta, Y.

    2004-07-01

    Because of limited space, the siting and construction of a new SWM facility is a big challenge in Japan. An SWM facility should be socially accepted as well as environmentally and economically sound. This study aimed to investigate people's concerns about SWM facilities and their attitudes towards such facilities. A questionnaire was designed based on literature reviews and was sent to residents in three municipalities with different backgrounds. The questions covered concerns on the impact of an SWM facility, management aspects, unfairness of facility siting, and attitudes to facility construction. Of the many concerns, 'pollution and health effect' had themore » highest rating, followed by 'reliability', 'damage to nature' and 'cost'. The rating was different between municipalities, reflecting their geographic and social backgrounds. Using factor analysis, correlations among concerns were analyzed, and five principal components were extracted, namely 'pollution', 'nuisance', 'facility management', 'planning of facility', and 'merit/demerit'. Although obvious correlations were not found between individual items of concern and attitudes to construction of a facility, the discriminant analysis indicated dominant concerns of attitudes, but the disagreement between actual impact and citizens were found. As for attributes, the 'opposed' attitude decreased for residents who had visited an SWM facility, even if they had only seen it from outside.« less

  1. A software for managing after-hours activities in research user facilities

    DOE PAGES

    Camino, F. E.

    2017-05-01

    Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.

  2. A software for managing after-hours activities in research user facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camino, F. E.

    Here, we present an afterhours activity management program for shared facilities, which handles the processes required for afterhours access (request, approval, extension, etc.). It implements the concept of permitted afterhours activities, which consists of a list of well-defined activities that each user can perform afterhours. The program provides an easy and unambiguous way for users to know which activities they are allowed to perform afterhours. In addition, the program can enhance its safety efficacy by interacting with lab and instrument access control systems commonly present in user facilities.

  3. Energy Systems Integration Facility Videos | Energy Systems Integration

    Science.gov Websites

    Facility | NREL Energy Systems Integration Facility Videos Energy Systems Integration Facility Integration Facility NREL + SolarCity: Maximizing Solar Power on Electrical Grids Redefining What's Possible for Renewable Energy: Grid Integration Robot-Powered Reliability Testing at NREL's ESIF Microgrid

  4. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area

  5. Feasibility study for a transportation operations system cask maintenance facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the caskmore » systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.« less

  6. Take a Tour of Our Facility | Energy Systems Integration Facility | NREL

    Science.gov Websites

    Take a Tour of Our Facility Take a Tour of Our Facility The Energy Systems Integration Facility Optical Characterization Laboratory System Performance Laboratory Power Systems Integration Laboratory Control Room Energy Storage Laboratory Outdoor Testing Areas Outdoor Testing Areas Energy Systems

  7. Evolution of the Building Management System in the INFN CNAF Tier-1 data center facility.

    NASA Astrophysics Data System (ADS)

    Ricci, Pier Paolo; Donatelli, Massimo; Falabella, Antonio; Mazza, Andrea; Onofri, Michele

    2017-10-01

    The INFN CNAF Tier-1 data center is composed by two different main rooms containing IT resources and four additional locations that hosts the necessary technology infrastructures providing the electrical power and cooling to the facility. The power supply and continuity are ensured by a dedicated room with three 15,000 to 400 V transformers in a separate part of the principal building and two redundant 1.4MW diesel rotary uninterruptible power supplies. The cooling is provided by six free cooling chillers of 320 kW each with a N+2 redundancy configuration. Clearly, considering the complex physical distribution of the technical plants, a detailed Building Management System (BMS) was designed and implemented as part of the original project in order to monitor and collect all the necessary information and for providing alarms in case of malfunctions or major failures. After almost 10 years of service, a revision of the BMS system was somewhat necessary. In addition, the increasing cost of electrical power is nowadays a strong motivation for improving the energy efficiency of the infrastructure. Therefore the exact calculation of the power usage effectiveness (PUE) metric has become one of the most important factors when aiming for the optimization of a modern data center. For these reasons, an evolution of the BMS system was designed using the Schneider StruxureWare infrastructure hardware and software products. This solution proves to be a natural and flexible development of the previous TAC Vista software with advantages in the ease of use and the possibility to customize the data collection and the graphical interfaces display. Moreover, the addition of protocols like open standard Web services gives the possibility to communicate with the BMS from custom user application and permits the exchange of data and information through the Web between different third-party systems. Specific Web services SOAP requests has been implemented in our Tier-1 monitoring system in

  8. Wall finish selection in hospital design: a survey of facility managers.

    PubMed

    Lavy, Sarel; Dixit, Manish K

    2012-01-01

    This paper seeks to analyze healthcare facility managers' perceptions regarding the materials used for interior wall finishes and the criteria used to select them. It also examines differences in wall finish materials and the selection process in three major hospital spaces: emergency, surgery, and in-patient units. These findings are compared with healthcare designers' perceptions on similar issues, as currently documented in the literature. Hospital design and the materials used for hospital construction have a considerable effect on the environment and health of patients. A 2002 survey revealed which characteristics healthcare facility designers consider when selecting materials for healthcare facilities; however, no similar study has examined the views of facility managers on building finish selection. A 22-question survey questionnaire was distributed to 210 facility managers of metropolitan, for-profit hospitals in Texas; IRB approval was obtained. Respondents were asked to rank 10 interior wall finish materials and 11 selection criteria for wall finishes. Data from 48 complete questionnaires were analyzed using descriptive statistics and nonparametric statistical analysis methods. The study found no statistically significant differences in terms of wall finish materials or the characteristics for material selection in the three major spaces studied. It identified facility managers' four most-preferred wall finish materials and the five-most preferred characteristics, with a statistical confidence level of greater than 95%. The paper underscores the importance of incorporating all perspectives: facility designers and facility managers should work together toward achieving common organizational goals.

  9. Using Decision Analysis to Select Facility Maintenance Management Information Systems

    DTIC Science & Technology

    2010-03-01

    efficient way possible. Many of today’s maintenance managers thus apply computerized tools that come in the form of information systems that assist in... apply to effectively select a maintenance management information system that enables them to meet the needs of their customers. 3 1.2 Background...recession of the early 1990s. During this time, companies downsized their white-collar workforce performing daily operation and maintenance functions

  10. Radioactive Waste Management and Nuclear Facility Decommissioning Progress in Iraq - 13216

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Musawi, Fouad; Shamsaldin, Emad S.; Jasim, Hadi

    2013-07-01

    Management of Iraq's radioactive wastes and decommissioning of Iraq's former nuclear facilities are the responsibility of Iraq's Ministry of Science and Technology (MoST). The majority of Iraq's former nuclear facilities are in the Al-Tuwaitha Nuclear Research Center located a few kilometers from the edge of Baghdad. These facilities include bombed and partially destroyed research reactors, a fuel fabrication facility and radioisotope production facilities. Within these facilities are large numbers of silos, approximately 30 process or waste storage tanks and thousands of drums of uncharacterised radioactive waste. There are also former nuclear facilities/sites that are outside of Al-Tuwaitha and these includemore » the former uranium processing and waste storage facility at Jesira, the dump site near Adaya, the former centrifuge facility at Rashdiya and the former enrichment plant at Tarmiya. In 2005, Iraq lacked the infrastructure needed to decommission its nuclear facilities and manage its radioactive wastes. The lack of infrastructure included: (1) the lack of an organization responsible for decommissioning and radioactive waste management, (2) the lack of a storage facility for radioactive wastes, (3) the lack of professionals with experience in decommissioning and modern waste management practices, (4) the lack of laws and regulations governing decommissioning or radioactive waste management, (5) ongoing security concerns, and (6) limited availability of electricity and internet. Since its creation eight years ago, the MoST has worked with the international community and developed an organizational structure, trained staff, and made great progress in managing radioactive wastes and decommissioning Iraq's former nuclear facilities. This progress has been made, despite the very difficult implementing conditions in Iraq. Within MoST, the Radioactive Waste Treatment and Management Directorate (RWTMD) is responsible for waste management and the Iraqi

  11. Facilities Management via Computer: Information at Your Fingertips.

    ERIC Educational Resources Information Center

    Hensey, Susan

    1996-01-01

    Computer-aided facilities management is a software program consisting of a relational database of facility information--such as occupancy, usage, student counts, etc.--attached to or merged with computerized floor plans. This program can integrate data with drawings, thereby allowing the development of "what if" scenarios. (MLF)

  12. Utilizing Interns in Facilities Management

    ERIC Educational Resources Information Center

    Judkins, Clarissa; Morris, John P.; Molocznik, Chuck

    2011-01-01

    Facilities management is rapidly changing and developing from a position an individual stumbles into--or work one's way up through--to a discipline and vocation all of its own. There is a need for a collaborative strategy among leaders in practice, education, and research to share knowledge and experience and to establish professional and ethical…

  13. A Medical Decision Support System for the Space Station Health Maintenance Facility

    PubMed Central

    Ostler, David V.; Gardner, Reed M.; Logan, James S.

    1988-01-01

    NASA is developing a Health Maintenance Facility (HMF) to provide the equipment and supplies necessary to deliver medical care in the Space Station. An essential part of the Health Maintenance Facility is a computerized Medical Decision Support System (MDSS) that will enhance the ability of the medical officer (“paramedic” or “physician”) to maintain the crew's health, and to provide emergency medical care. The computer system has four major functions: 1) collect and integrate medical information into an electronic medical record from Space Station medical officers, HMF instrumentation, and exercise equipment; 2) provide an integrated medical record and medical reference information management system; 3) manage inventory for logistical support of supplies and secure pharmaceuticals; 4) supply audio and electronic mail communications between the medical officer and ground based flight surgeons. ImagesFigure 1

  14. The ABC's required for establishing a practical computerized plant engineering management data base system

    NASA Technical Reports Server (NTRS)

    Maiocco, F. R.; Hume, J. P.

    1976-01-01

    A system's approach is outlined in the paper to assist facility and Plant Engineers improve their organization's data management system. The six basic steps identified may appear somewhat simple; however, adequate planning, proper resources, and the involvement of management will determine the success of a computerized facility management data base. Helpful suggestions are noted throughout the paper to insure the development of a practical computerized data management system.

  15. Predictive Analytics to Support Real-Time Management in Pathology Facilities.

    PubMed

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses.

  16. Legionella and risk management in hospitals-A bibliographic research methodology for people responsible for built environment and facility management.

    PubMed

    Leiblein, Thomas W; Tucker, Matthew; Ashall, Mal; Lee, Susanne B; Gollnisch, Carsten; Hofer, Susanne

    2016-11-01

    An ongoing research project investigates the roles and duties of persons responsible for the built environment with respect to risk management of water systems and Legionella prevention from a facility management's perspective. Our literature review provides an approach for selecting and analysing abstracts of initially 177 journal articles, subjected to certain topic-specific inclusion and exclusion criteria. Different decision strategies of either logic 'yes/no', Boolean operators 'OR' or 'AND' and decisions for single counts or cumulative counts of the identified three principal keywords 'Legionella', 'hospital' and 'water', were completed. A final list of ten principal reference articles from 29 journals was compiled. It suggests that the interconnected perspective of water systems, Legionella and hospitals seems to be underrepresented in the field of the built environment and facility management. The term 'stakeholder', which would refer to decision-makers, was not found more than once. Our result is a useful summary of established sources of information on environmental Legionella research. The results can be helpful for those new to the topic. Copyright © 2016 Elsevier GmbH. All rights reserved.

  17. Manure management and temperature impacts on gas concentrations in monoslope cattle facilities

    USDA-ARS?s Scientific Manuscript database

    Roofed and confined cattle feeding facilities are increasingly popular in the Northern Great Plains, but little is known about the impact this housing system and associated manure management methods have on the air quality inside and outside the barn. The objective of this study was to determine ga...

  18. Support systems of the orbiting quarantine facility

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The physical support systems, the personnel management structure, and the contingency systems necessary to permit the Orbiting Quarantine Facility (OQF) to function as an integrated system are described. The interactions between the subsystems within the preassembled modules are illustrated. The Power Module generates and distributes electrical power throughout each of the four modules, stabilizes the OQF's attitude, and dissipates heat generated throughout the system. The Habitation Module is a multifunctional structure designed to monitor and control all aspects of the system's activities. The Logistics Module stores the supplies needed for 30 days of operation and provides storage for waste materials generated during the mission. The Laboratory Module contains the equipment necessary for executing the protocol, as well as an independent life support system.

  19. Methods and Systems for Advanced Spaceport Information Management

    NASA Technical Reports Server (NTRS)

    Fussell, Ronald M. (Inventor); Ely, Donald W. (Inventor); Meier, Gary M. (Inventor); Halpin, Paul C. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor); Blackwell-Thompson, Charlie (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  20. Methods and systems for advanced spaceport information management

    NASA Technical Reports Server (NTRS)

    Ely, Donald W. (Inventor); Fussell, Ronald M. (Inventor); Halpin, Paul C. (Inventor); Blackwell-Thompson, Charlie (Inventor); Meier, Gary M. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  1. Controlling changes - lessons learned from waste management facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, B.M.; Koplow, A.S.; Stoll, F.E.

    This paper discusses lessons learned about change control at the Waste Reduction Operations Complex (WROC) and Waste Experimental Reduction Facility (WERF) of the Idaho National Engineering Laboratory (INEL). WROC and WERF have developed and implemented change control and an as-built drawing process and have identified structures, systems, and components (SSCS) for configuration management. The operations have also formed an Independent Review Committee to minimize costs and resources associated with changing documents. WROC and WERF perform waste management activities at the INEL. WROC activities include storage, treatment, and disposal of hazardous and mixed waste. WERF provides volume reduction of solid low-levelmore » waste through compaction, incineration, and sizing operations. WROC and WERF`s efforts aim to improve change control processes that have worked inefficiently in the past.« less

  2. A distributed data base management facility for the CAD/CAM environment

    NASA Technical Reports Server (NTRS)

    Balza, R. M.; Beaudet, R. W.; Johnson, H. R.

    1984-01-01

    Current/PAD research in the area of distributed data base management considers facilities for supporting CAD/CAM data management in a heterogeneous network of computers encompassing multiple data base managers supporting a variety of data models. These facilities include coordinated execution of multiple DBMSs to provide for administration of and access to data distributed across them.

  3. Total Quality Management for Campus Facilities.

    ERIC Educational Resources Information Center

    Reynolds, Gary L.

    1992-01-01

    This article examines the total quality management (TQM) concept as it is applied to higher education campus facilities. Each of the fundamental principles of TQM are examined as follows: customer-centered orientation; leadership; improved communication; continuous improvement; accountability; and quality of life. (GLR)

  4. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  5. Biosafety and biosecurity measures: management of biosafety level 3 facilities.

    PubMed

    Zaki, Adel N

    2010-11-01

    With the increasing biological threat from emerging infectious diseases and bioterrorism, it has become essential for governments around the globe to increase awareness and preparedness for identifying and containing those agents. This article introduces the basic concepts of laboratory management, laboratory biosafety and laboratory biosecurity. Assessment criteria for laboratories' biorisk should include both biosafety and biosecurity measures. The assessment requires setting specific goals and selecting management approaches. In order to implement technologies at the laboratory working level, a management team should be created whose role is to implement biorisk policies, rules and regulations appropriate for that facility. Rules and regulations required by government authorities are presented, with special emphasis on methods for air control, and liquid and solid waste management. Management and biorisk measures and appropriate physical facilities must keep pace, ensuring efficient facilities that protect workers, the environment, the product (research, diagnostic and/or vaccine) and the biological pathogen. Published by Elsevier B.V.

  6. Predictive Analytics to Support Real-Time Management in Pathology Facilities

    PubMed Central

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses. PMID:28269873

  7. The quality management journey: the progress of health facilities in Australia.

    PubMed

    Carr, B J

    1994-12-01

    Many facilities in Australia have taken the Total Quality Management (TQM) step. The objective of this study was to examine progress of adopted formal quality systems in health. Sixty per cent of organizations surveyed have adopted formal systems. Of these, Deming adherents are the most common, followed by eclectic choices. Only 35% considered the quality transition as reasonably easy. There was no relationship between accreditation and formal quality systems identified. The most common improvement techniques were: flow charts, histograms, and cause and effect diagrams. Quality practitioners are happy to use several tools exceptionally well rather than have many tools at their disposal. The greatest impediment to the adoption of quality was the lack of top management support. This study did not support the view that clinicians are not readily actively supporting quality initiatives. Total Quality Management is not a mature concept; however, Chief Executive Officers are assured that rewards will be realized over time.

  8. Quality management standards for facility services in the Italian health care sector.

    PubMed

    Cesarotti, Vittorio; Di Silvio, Bruna

    2006-01-01

    Health care, one of the most dynamic sectors in Italy, is studied with a particular focus on outsourcing non-core activities such as facility management (FM) services. The project's goals are to define national standards to balance and control facility service evolution, and to drive FM services towards organisational excellence. The authors, in cooperation with a pool of facility service providers and hospitals managers, studied cleaning services--one of the most critical areas. This article describes the research steps and findings following definition and publication of the Italian standard and its application to an international benchmarking process. The method chosen for developing the Italian standard was to merge technical, strategic and organisational aspects with the goal of standardising the contracting system, giving service providers the chance to improve efficiency and quality, while helping healthcare organisations gain from a better, more reliable and less expensive service. The Italian standard not only improved services but also provided adequate control systems for outsourcing organisations. In this win-win context, it is hoped to continually drive FM services towards organisational excellence. This study is specific to the Italian national healthcare system. However, the strategic dynamics described are common to many other contexts. A systematic method for improving hospital FM services is presented. The authors believe that lessons learned from their Italian case study can be used to better understand and drive similar services in other countries or in other FM service outsourcing sectors.

  9. Perspectives on Leadership in Facilities Management.

    ERIC Educational Resources Information Center

    Jenkins, Charles W. Ed.

    This collection of papers examines issues concerning leadership in facilities management in higher education. Chapters include: (1) "Catch the Spirit of Leadership" (Jack Hug); (2) "Visionary Leadership: Creating a New Tomorrow" (Burt Nanus); (3) "Some Thoughts on Leadership" (Charles W. Jenkins); (4) "Educational Leadership: The Role of…

  10. Aeropropulsion facilities configuration control: Procedures manual

    NASA Technical Reports Server (NTRS)

    Lavelle, James J.

    1990-01-01

    Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

  11. D-Side: A Facility and Workforce Planning Group Multi-criteria Decision Support System for Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tavana, Madjid

    2005-01-01

    "To understand and protect our home planet, to explore the universe and search for life, and to inspire the next generation of explorers" is NASA's mission. The Systems Management Office at Johnson Space Center (JSC) is searching for methods to effectively manage the Center's resources to meet NASA's mission. D-Side is a group multi-criteria decision support system (GMDSS) developed to support facility decisions at JSC. D-Side uses a series of sequential and structured processes to plot facilities in a three-dimensional (3-D) graph on the basis of each facility alignment with NASA's mission and goals, the extent to which other facilities are dependent on the facility, and the dollar value of capital investments that have been postponed at the facility relative to the facility replacement value. A similarity factor rank orders facilities based on their Euclidean distance from Ideal and Nadir points. These similarity factors are then used to allocate capital improvement resources across facilities. We also present a parallel model that can be used to support decisions concerning allocation of human resources investments across workforce units. Finally, we present results from a pilot study where 12 experienced facility managers from NASA used D-Side and the organization's current approach to rank order and allocate funds for capital improvement across 20 facilities. Users evaluated D-Side favorably in terms of ease of use, the quality of the decision-making process, decision quality, and overall value-added. Their evaluations of D-Side were significantly more favorable than their evaluations of the current approach. Keywords: NASA, Multi-Criteria Decision Making, Decision Support System, AHP, Euclidean Distance, 3-D Modeling, Facility Planning, Workforce Planning.

  12. Thermal Distribution System | Energy Systems Integration Facility | NREL

    Science.gov Websites

    Thermal Distribution System Thermal Distribution System The Energy Systems Integration Facility's integrated thermal distribution system consists of a thermal water loop connected to a research boiler and . Photo of the roof of the Energy Systems Integration Facility. The thermal distribution bus allows

  13. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  14. The grand challenge of managing the petascale facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aiken, R. J.; Mathematics and Computer Science

    2007-02-28

    This report is the result of a study of networks and how they may need to evolve to support petascale leadership computing and science. As Dr. Ray Orbach, director of the Department of Energy's Office of Science, says in the spring 2006 issue of SciDAC Review, 'One remarkable example of growth in unexpected directions has been in high-end computation'. In the same article Dr. Michael Strayer states, 'Moore's law suggests that before the end of the next cycle of SciDAC, we shall see petaflop computers'. Given the Office of Science's strong leadership and support for petascale computing and facilities, wemore » should expect to see petaflop computers in operation in support of science before the end of the decade, and DOE/SC Advanced Scientific Computing Research programs are focused on making this a reality. This study took its lead from this strong focus on petascale computing and the networks required to support such facilities, but it grew to include almost all aspects of the DOE/SC petascale computational and experimental science facilities, all of which will face daunting challenges in managing and analyzing the voluminous amounts of data expected. In addition, trends indicate the increased coupling of unique experimental facilities with computational facilities, along with the integration of multidisciplinary datasets and high-end computing with data-intensive computing; and we can expect these trends to continue at the petascale level and beyond. Coupled with recent technology trends, they clearly indicate the need for including capability petascale storage, networks, and experiments, as well as collaboration tools and programming environments, as integral components of the Office of Science's petascale capability metafacility. The objective of this report is to recommend a new cross-cutting program to support the management of petascale science and infrastructure. The appendices of the report document current and projected DOE computation facilities

  15. Advanced building energy management system demonstration for Department of Defense buildings.

    PubMed

    O'Neill, Zheng; Bailey, Trevor; Dong, Bing; Shashanka, Madhusudana; Luo, Dong

    2013-08-01

    This paper presents an advanced building energy management system (aBEMS) that employs advanced methods of whole-building performance monitoring combined with statistical methods of learning and data analysis to enable identification of both gradual and discrete performance erosion and faults. This system assimilated data collected from multiple sources, including blueprints, reduced-order models (ROM) and measurements, and employed advanced statistical learning algorithms to identify patterns of anomalies. The results were presented graphically in a manner understandable to facilities managers. A demonstration of aBEMS was conducted in buildings at Naval Station Great Lakes. The facility building management systems were extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of more efficient operation strategies. At Naval Station Great Lakes, greater than 20% savings were demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy-efficient operation strategies. The paper concludes with recommendations for widespread aBEMS success. © 2013 New York Academy of Sciences.

  16. Expert Systems for United States Navy Shore Facilities Utility Operations.

    DTIC Science & Technology

    1988-03-01

    of expertise when assessing the applicability of an expert system. Each of the tasks as similarly ranked to reflect subjective judgement on the...United States Navy Shore Facilities Utility Operations ABSTRACT A technology assessment of expert systems as they might be used in Navy utility...of these applications include design, fault diagnoses, training, data base management, and real-time monitoring. An assessment is given of each

  17. ISO 55000: Creating an asset management system.

    PubMed

    Bradley, Chris; Main, Kevin

    2015-02-01

    In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.

  18. Contracting for Facilities Services. Critical Issues in Facilities Management. No. 9.

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    This book has been designed to provide practical information to managers on how to work with outside contractors in the higher education facilities area, and provides "real world" advice on the opportunities and pitfalls of privatization. Overviews and detailed case studies of contracting-out for services such as custodial services and…

  19. Health facility committees and facility management - exploring the nature and depth of their roles in Coast Province, Kenya

    PubMed Central

    2011-01-01

    Background Community participation has been emphasized internationally as a way of enhancing accountability, as well as a means to enhance health goals in terms of coverage, access and effective utilization. In rural health facilities in Kenya, initiatives to increase community accountability have focused on Health Facility Committees (HFCs). In Coast Province the role of HFCs has been expanded with the introduction of direct funding of rural facilities. We explored the nature and depth of managerial engagement of HFCs at the facility level in two rural districts in this Coastal setting, and how this has contributed to community accountability Methods We conducted structured interviews with the health worker in-charge and with patients in 30 health centres and dispensaries. These data were supplemented with in-depth interviews with district managers, and with health workers and HFC members in 12 health centres and dispensaries. In-depth interviews with health workers and HFC members included a participatory exercise to stimulate discussion of the nature and depth of their roles in facility management. Results HFCs were generally functioning well and played an important role in facility operations. The breadth and depth of engagement had reportedly increased after the introduction of direct funding of health facilities which allowed HFCs to manage their own budgets. Although relations with facility staff were generally good, some mistrust was expressed between HFC members and health workers, and between HFC members and the broader community, partially reflecting a lack of clarity in HFC roles. Moreover, over half of exit interviewees were not aware of the HFC's existence. Women and less well-educated respondents were particularly unlikely to know about the HFC. Conclusions There is potential for HFCs to play an active and important role in health facility management, particularly where they have control over some facility level resources. However, to optimise their

  20. Health facility committees and facility management - exploring the nature and depth of their roles in Coast Province, Kenya.

    PubMed

    Goodman, Catherine; Opwora, Antony; Kabare, Margaret; Molyneux, Sassy

    2011-09-22

    Community participation has been emphasized internationally as a way of enhancing accountability, as well as a means to enhance health goals in terms of coverage, access and effective utilization. In rural health facilities in Kenya, initiatives to increase community accountability have focused on Health Facility Committees (HFCs). In Coast Province the role of HFCs has been expanded with the introduction of direct funding of rural facilities. We explored the nature and depth of managerial engagement of HFCs at the facility level in two rural districts in this Coastal setting, and how this has contributed to community accountability We conducted structured interviews with the health worker in-charge and with patients in 30 health centres and dispensaries. These data were supplemented with in-depth interviews with district managers, and with health workers and HFC members in 12 health centres and dispensaries. In-depth interviews with health workers and HFC members included a participatory exercise to stimulate discussion of the nature and depth of their roles in facility management. HFCs were generally functioning well and played an important role in facility operations. The breadth and depth of engagement had reportedly increased after the introduction of direct funding of health facilities which allowed HFCs to manage their own budgets. Although relations with facility staff were generally good, some mistrust was expressed between HFC members and health workers, and between HFC members and the broader community, partially reflecting a lack of clarity in HFC roles. Moreover, over half of exit interviewees were not aware of the HFC's existence. Women and less well-educated respondents were particularly unlikely to know about the HFC. There is potential for HFCs to play an active and important role in health facility management, particularly where they have control over some facility level resources. However, to optimise their contribution, efforts are needed to

  1. Environmental Management Guide for Educational Facilities

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, 2017

    2017-01-01

    Since 1996, APPA and CSHEMA, the Campus Safety Health and Environmental Management Association, have collaborated to produce guidance documents to help educational facilities get ahead of the moving target that is environmental compliance. This new 2017 edition will help you identify which regulations pertain to your institution, and assist in…

  2. 41 CFR 102-192.135 - Must we have a mail center manager at our facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... center manager at our facility? 102-192.135 Section 102-192.135 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Mail Center Manager Requirements § 102-192.135 Must we have a mail center manager at our facility? Yes, every facility that has more than two full time people dedicated to...

  3. Facility Design and Health Management Program at the Sinnhuber Aquatic Research Laboratory

    PubMed Central

    Barton, Carrie L.; Johnson, Eric W.

    2016-01-01

    Abstract The number of researchers and institutions moving to the utilization of zebrafish for biomedical research continues to increase because of the recognized advantages of this model. Numerous factors should be considered before building a new or retooling an existing facility. Design decisions will directly impact the management and maintenance costs. We and others have advocated for more rigorous approaches to zebrafish health management to support and protect an increasingly diverse portfolio of important research. The Sinnhuber Aquatic Research Laboratory (SARL) is located ∼3 miles from the main Oregon State University campus in Corvallis, Oregon. This facility supports several research programs that depend heavily on the use of adult, larval, and embryonic zebrafish. The new zebrafish facility of the SARL began operation in 2007 with a commitment to build and manage an efficient facility that diligently protects human and fish health. An important goal was to ensure that the facility was free of Pseudoloma neurophilia (Microsporidia), which is very common in zebrafish research facilities. We recognize that there are certain limitations in space, resources, and financial support that are institution dependent, but in this article, we describe the steps taken to build and manage an efficient specific pathogen-free facility. PMID:26981844

  4. Facility Design and Health Management Program at the Sinnhuber Aquatic Research Laboratory.

    PubMed

    Barton, Carrie L; Johnson, Eric W; Tanguay, Robert L

    2016-07-01

    The number of researchers and institutions moving to the utilization of zebrafish for biomedical research continues to increase because of the recognized advantages of this model. Numerous factors should be considered before building a new or retooling an existing facility. Design decisions will directly impact the management and maintenance costs. We and others have advocated for more rigorous approaches to zebrafish health management to support and protect an increasingly diverse portfolio of important research. The Sinnhuber Aquatic Research Laboratory (SARL) is located ∼3 miles from the main Oregon State University campus in Corvallis, Oregon. This facility supports several research programs that depend heavily on the use of adult, larval, and embryonic zebrafish. The new zebrafish facility of the SARL began operation in 2007 with a commitment to build and manage an efficient facility that diligently protects human and fish health. An important goal was to ensure that the facility was free of Pseudoloma neurophilia (Microsporidia), which is very common in zebrafish research facilities. We recognize that there are certain limitations in space, resources, and financial support that are institution dependent, but in this article, we describe the steps taken to build and manage an efficient specific pathogen-free facility.

  5. Development of a change management system

    NASA Technical Reports Server (NTRS)

    Parks, Cathy Bonifas

    1993-01-01

    The complexity and interdependence of software on a computer system can create a situation where a solution to one problem causes failures in dependent software. In the computer industry, software problems arise and are often solved with 'quick and dirty' solutions. But in implementing these solutions, documentation about the solution or user notification of changes is often overlooked, and new problems are frequently introduced because of insufficient review or testing. These problems increase when numerous heterogeneous systems are involved. Because of this situation, a change management system plays an integral part in the maintenance of any multisystem computing environment. At the NASA Ames Advanced Computational Facility (ACF), the Online Change Management System (OCMS) was designed and developed to manage the changes being applied to its multivendor computing environment. This paper documents the research, design, and modifications that went into the development of this change management system (CMS).

  6. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  7. Data Acquisition System Architecture and Capabilities At NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2012-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world?s largest space environment test facilities located at the NASA Glenn Research Center?s Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  8. Data Acquisition System Architecture and Capabilities at NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2014-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world's largest space environment test facilities located at the NASA Glenn Research Center's Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  9. Improving heart failure disease management in skilled nursing facilities: lessons learned.

    PubMed

    Dolansky, Mary A; Hitch, Jeanne A; Piña, Ileana L; Boxer, Rebecca S

    2013-11-01

    The purpose of the study was to design and evaluate an improvement project that implemented HF management in four skilled nursing facilities (SNFs). Kotter's Change Management principles were used to guide the implementation. In addition, half of the facilities had an implementation coach who met with facility staff weekly for 4 months and monthly for 5 months. Weekly and monthly audits were performed that documented compliance with eight key aspects of the protocol. Contextual factors were captured using field notes. Adherence to the HF management protocols was variable ranging from 17% to 82%. Facilitators of implementation included staff who championed the project, an implementation coach, and physician involvement. Barriers were high staff turnover and a hierarchal culture. Opportunities exist to integrate HF management protocols to improve SNF care.

  10. Challenges Associated With Managing Suicide Risk in Long-Term Care Facilities.

    PubMed

    O'Riley, Alisa; Nadorff, Michael R; Conwell, Yeates; Edelstein, Barry

    2013-06-01

    Little information about suicidal ideation and behavior in long-term care (LTC) facilities is available. Nonetheless, the implementation of the Minimum Data Set 3.0 requires that LTC facilities screen their residents for suicide risk and have protocols in place to effectively manage residents' responses. In this article, the authors briefly discuss the risk factors of suicide in the elderly and the problems that suicidal ideation and behavior pose in the LTC environment. The authors explain issues that arise when trying to manage suicide risk in the elderly LTC population with general, traditional approaches. These inherent issues make it difficult to develop an effective protocol for managing suicide risk in LTC facilities, leading the authors to propose their own framework for assessing and managing suicide risk in the LTC setting.

  11. Airport Economics: Management Control Financial Reporting Systems

    NASA Technical Reports Server (NTRS)

    Buchbinder, A.

    1972-01-01

    The development of management control financial reporting systems for airport operation is discussed. The operation of the system to provide the reports required for determining the specific revenue producing facilities of airports is described. The organization of the cost reporting centers to show the types of information provided by the system is analyzed.

  12. Capacity of Health Facilities to Manage Hypertension in Mukono and Buikwe Districts in Uganda: Challenges and Recommendations.

    PubMed

    Musinguzi, Geofrey; Bastiaens, Hilde; Wanyenze, Rhoda K; Mukose, Aggrey; Van Geertruyden, Jean-Pierre; Nuwaha, Fred

    2015-01-01

    The burden of chronic diseases is increasing in both low- and middle-income countries. However, healthcare systems in low-income countries are inadequately equipped to deal with the growing disease burden, which requires chronic care for patients. The aim of this study was to assess the capacity of health facilities to manage hypertension in two districts in Uganda. In a cross-sectional study conducted between June and October 2012, we surveyed 126 health facilities (6 hospitals, 4 Health Center IV (HCIV), 23 Health Center III (HCIII), 41 Health Center II (HCII) and 52 private clinics/dispensaries) in Mukono and Buikwe districts in Uganda. We assessed records, conducted structured interviews with heads of facilities, and administered questionnaires to 271 health workers. The study assessed service provision for hypertension, availability of supplies such as medicines, guidelines and equipment, in-service training for hypertension, knowledge of hypertension management, challenges and recommendations. Of the 126 health facilities, 92.9% reported managing (diagnosing/treating) patients with hypertension, and most (80.2%) were run by non-medical doctors or non-physician health workers (NPHW). Less than half (46%) of the facilities had guidelines for managing hypertension. A 10th of the facilities lacked functioning blood pressure devices and 28% did not have stethoscopes. No facilities ever calibrated their BP devices except one. About a half of the facilities had anti-hypertensive medicines in stock; mainly thiazide diuretics (46%), beta blockers (56%) and calcium channel blockers (48.4%). Alpha blockers, mixed alpha & beta blockers and angiotensin II receptor antagonists were only stocked by private clinics/dispensaries. Most HCIIs lacked anti-hypertensive medicines, including the first line thiazide diuretics. Significant knowledge gaps in classification of patients as hypertensive were noted among respondents. All health workers (except 5, 1.9%) indicated that they

  13. An environmental testing facility for Space Station Freedom power management and distribution hardware

    NASA Technical Reports Server (NTRS)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  14. R2 REGULATED FACILITIES

    EPA Science Inventory

    The Facility Registry System (FRS) is a centrally managed database that identifies facilities, sites or places subject to environmental regulations or of environmental interest. FRS creates high-quality, accurate, and authoritative facility identification records through rigorous...

  15. Modeling, simulation and control for a cryogenic fluid management facility, preliminary report

    NASA Technical Reports Server (NTRS)

    Turner, Max A.; Vanbuskirk, P. D.

    1986-01-01

    The synthesis of a control system for a cryogenic fluid management facility was studied. The severe demand for reliability as well as instrumentation and control unique to the Space Station environment are prime considerations. Realizing that the effective control system depends heavily on quantitative description of the facility dynamics, a methodology for process identification and parameter estimation is postulated. A block diagram of the associated control system is also produced. Finally, an on-line adaptive control strategy is developed utilizing optimization of the velocity form control parameters (proportional gains, integration and derivative time constants) in appropriate difference equations for direct digital control. Of special concern are the communications, software and hardware supporting interaction between the ground and orbital systems. It is visualized that specialist in the OSI/ISO utilizing the Ada programming language will influence further development, testing and validation of the simplistic models presented here for adaptation to the actual flight environment.

  16. A management information system for nurse/midwives.

    PubMed Central

    Ogunbekun, I.

    1999-01-01

    The experiences of nurse/midwives with a simple management information system in the private sector are reported from four facilities in Nigeria. When such a system is being introduced, special attention should be given to strengthening the ability of health workers to record and collate data satisfactorily. PMID:10083721

  17. Pakistan's health management information system: health managers' perspectives.

    PubMed

    Qazi, Muhammad Suleman; Ali, Moazzam

    2009-01-01

    To explore the perceptions of health managers regarding Health Management Information System (HMIS), within their organizational setting and in the context of decentralization process in Pakistan. Owing to the importance of HMIS as a decision making tool and the dependency for its effectiveness on the field-managers who are the key stake holders, a qualitative research was planned to explore, understand, and describe the perceptions of health managers regarding HMIS within their organizational setting in Pakistan. The study was carried out in seven selected districts in all provinces of Pakistan. The strengths highlighted were the sustainability of system even after suspension of funds from donors; vast coverage of over ten thousand health facilities, logistics and drug support systems. The weaknesses included scarcity of resources (i.e. skilled personnel and financial resources), contentious quality and underutilization of data; lack of motivation and feedback among health managers. There is a need to instigate organizational development and institutional strengthening initiatives. These may include defining the structure of organizations; specifying the roles, responsibilities and defining a career structure; managing resources; overhauling the training activity, right from needs assessment to evaluation; creating sense of responsibility; motivating the staff; giving incentives for good work and inculcating work ethics.

  18. Effects of an incinerator project on a healthcare-waste management system.

    PubMed

    Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup

    2011-10-01

    This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.

  19. Managing Energy in Your Educational Facility.

    ERIC Educational Resources Information Center

    2001

    This booklet explains how to develop and implement a plan to manage energy in educational facilities. It can be used to identify energy savings opportunities and implement a plan to reduce energy costs. It discusses the following steps for creating an effective energy-use plan: (1) get started and organize for success; (2) look at energy use and…

  20. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  1. Facility and Laboratory Equipment | Energy Systems Integration Facility |

    Science.gov Websites

    Energy Systems Integration Facility is its infrastructure. In addition to extensive fixed laboratory . Photo of researchers testing building loads and power networks in the Systems Performance Laboratory

  2. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  3. Energy Systems Integration Facility Overview

    ScienceCinema

    Arvizu, Dan; Chistensen, Dana; Hannegan, Bryan; Garret, Bobi; Kroposki, Ben; Symko-Davies, Martha; Post, David; Hammond, Steve; Kutscher, Chuck; Wipke, Keith

    2018-01-16

    The U.S. Department of Energy's Energy Systems Integration Facility (ESIF) is located at the National Renewable Energy Laboratory is the right tool, at the right time... a first-of-its-kind facility that addresses the challenges of large-scale integration of clean energy technologies into the energy systems that power the nation.

  4. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobson, D; Churby, A; Krieger, E

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less

  5. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  6. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  7. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  8. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  9. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  10. Capacity of Health Facilities to Manage Hypertension in Mukono and Buikwe Districts in Uganda: Challenges and Recommendations

    PubMed Central

    Musinguzi, Geofrey; Bastiaens, Hilde; Wanyenze, Rhoda K.; Mukose, Aggrey; Van geertruyden, Jean-Pierre; Nuwaha, Fred

    2015-01-01

    Background The burden of chronic diseases is increasing in both low- and middle-income countries. However, healthcare systems in low-income countries are inadequately equipped to deal with the growing disease burden, which requires chronic care for patients. The aim of this study was to assess the capacity of health facilities to manage hypertension in two districts in Uganda. Methods In a cross-sectional study conducted between June and October 2012, we surveyed 126 health facilities (6 hospitals, 4 Health Center IV (HCIV), 23 Health Center III (HCIII), 41 Health Center II (HCII) and 52 private clinics/dispensaries) in Mukono and Buikwe districts in Uganda. We assessed records, conducted structured interviews with heads of facilities, and administered questionnaires to 271 health workers. The study assessed service provision for hypertension, availability of supplies such as medicines, guidelines and equipment, in-service training for hypertension, knowledge of hypertension management, challenges and recommendations. Results Of the 126 health facilities, 92.9% reported managing (diagnosing/treating) patients with hypertension, and most (80.2%) were run by non-medical doctors or non-physician health workers (NPHW). Less than half (46%) of the facilities had guidelines for managing hypertension. A 10th of the facilities lacked functioning blood pressure devices and 28% did not have stethoscopes. No facilities ever calibrated their BP devices except one. About a half of the facilities had anti-hypertensive medicines in stock; mainly thiazide diuretics (46%), beta blockers (56%) and calcium channel blockers (48.4%). Alpha blockers, mixed alpha & beta blockers and angiotensin II receptor antagonists were only stocked by private clinics/dispensaries. Most HCIIs lacked anti-hypertensive medicines, including the first line thiazide diuretics. Significant knowledge gaps in classification of patients as hypertensive were noted among respondents. All health workers (except 5

  11. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  12. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey.

    PubMed

    Waweru, Evelyn; Opwora, Antony; Toda, Mitsuru; Fegan, Greg; Edwards, Tansy; Goodman, Catherine; Molyneux, Sassy

    2013-10-10

    Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users' low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative research on how HFMCs are adapting to

  13. Healthcare waste management status in Lagos State, Nigeria: a case study from selected healthcare facilities in Ikorodu and Lagos metropolis.

    PubMed

    Longe, Ezechiel O

    2012-06-01

    A survey of healthcare waste management practices and their implications for health and the environment was carried out. The study assessed waste management practices in 20 healthcare facilities ranging in capacity from 40 to 600 beds in Ikorodu and metropolitan Lagos, Lagos State, Nigeria. The prevailing healthcare waste management status was analysed. Management issues on quantities and proportion of different constituents of waste, segregation, collection, handling, transportation, treatment and disposal methods were assessed. The waste generation averaged 0.631 kg bed(-1) day(-1) over the survey area. The waste stream from the healthcare facilities consisted of general waste (59.0%), infectious waste (29.7%), sharps and pathological (8.9%), chemical (1.45%) and others (0.95%). Sharps/pathological waste includes disposable syringes. In general, the waste materials were collected in a mixed form, transported and disposed of along with municipal solid waste with attendant risks to health and safety. Most facilities lacked appropriate treatment systems for a variety of reasons that included inadequate funding and little or no priority for healthcare waste management as well as a lack of professionally competent waste managers among healthcare providers. Hazards associated with healthcare waste management and shortcomings in the existing system were identified.

  14. DOE LeRC photovoltaic systems test facility

    NASA Technical Reports Server (NTRS)

    Cull, R. C.; Forestieri, A. F.

    1978-01-01

    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

  15. Institutional management of core facilities during challenging financial times.

    PubMed

    Haley, Rand

    2011-12-01

    The economic downturn is likely to have lasting effects on institutions of higher education, prioritizing proactive institutional leadership and planning. Although by design, core research facilities are more efficient and effective than supporting individual pieces of research equipment, cores can have significant underlying financial requirements and challenges. This paper explores several possible institutional approaches to managing core facilities during challenging financial times.

  16. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... policy must Federal agencies follow in the management of facilities? 102-74.155 Section 102-74.155 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of facilities...

  17. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    PubMed Central

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The hospital must insure the CMMS project provides a means to implement an integrated on-line hospital information data base for use by departments in operating under a DRG-based Prospective Payment System. This paper presents guidelines for use in selecting a Case Mix Mangement System to meet the hospital's financial and operations planning, budgeting, marketing, and other management needs, while considering the data base implications of the implementation.

  18. EPA Facility Registry Service (FRS): TRI

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Toxic Release Inventory (TRI) System. TRI is a publicly available EPA database reported annually by certain covered industry groups, as well as federal facilities. It contains information about more than 650 toxic chemicals that are being used, manufactured, treated, transported, or released into the environment, and includes information about waste management and pollution prevention activities. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to TRI facilities once the TRI data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.

  19. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    NASA Technical Reports Server (NTRS)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  20. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, Juan; Anderson, Art

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less

  1. [Autonomy for financial management in public and private healthcare facilities in Brazil].

    PubMed

    Santos, Maria Angelica Borges dos; Madeira, Fátima Carvalho; Passos, Sonia Regina Lambert; Bakr, Felipe; Oliveira, Klivia Brayner de; Andreazzi, Marco Antonio Ratzsch de

    2014-01-01

    Autonomy in financial management is an advantage in public administration. A 2009 National Healthcare Facility Survey showed that 3.9% of Brazil's 52,055 public healthcare facilities had some degree of financial autonomy. Such autonomy was more common in inpatient facilities (17.8%), those managed by State governments (26.3%), and in Southern Brazil (6.6%). Autonomy was mainly partial (for resources in specific areas, relating to small outlays, consumables and capital goods, and outsourced services or personnel). 74.3% of 2,264 public facilities with any financial autonomy were under direct government administration. Financial autonomy in public healthcare facilities appears to be linked to local political decisions and not necessarily to the facility's specific legal and administrative status. However, legal status displays distinct scopes of autonomy - those under direct government administration tend to be less autonomous, and those under private businesses more autonomous; 85.8% of the 45,394 private healthcare facilities reported that they were financially autonomous.

  2. EPA Facility Registry Service (FRS): RCRA

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of hazardous waste facilities that link to the Resource Conservation and Recovery Act Information System (RCRAInfo). EPA's comprehensive information system in support of the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste Amendments (HSWA) of 1984, RCRAInfo tracks many types of information about generators, transporters, treaters, storers, and disposers of hazardous waste. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to RCRAInfo hazardous waste facilities once the RCRAInfo data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs

  3. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... GOOD LABORATORY PRACTICE STANDARDS Facilities § 160.43 Test system care facilities. (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure...

  4. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... GOOD LABORATORY PRACTICE STANDARDS Facilities § 160.43 Test system care facilities. (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure...

  5. Data management and its role in delivering science at DOE BES user facilities - Past, Present, and Future

    NASA Astrophysics Data System (ADS)

    Miller, Stephen D.; Herwig, Kenneth W.; Ren, Shelly; Vazhkudai, Sudharshan S.; Jemian, Pete R.; Luitz, Steffen; Salnikov, Andrei A.; Gaponenko, Igor; Proffen, Thomas; Lewis, Paul; Green, Mark L.

    2009-07-01

    The primary mission of user facilities operated by Basic Energy Sciences under the Department of Energy is to produce data for users in support of open science and basic research [1]. We trace back almost 30 years of history across selected user facilities illustrating the evolution of facility data management practices and how these practices have related to performing scientific research. The facilities cover multiple techniques such as X-ray and neutron scattering, imaging and tomography sciences. Over time, detector and data acquisition technologies have dramatically increased the ability to produce prolific volumes of data challenging the traditional paradigm of users taking data home upon completion of their experiments to process and publish their results. During this time, computing capacity has also increased dramatically, though the size of the data has grown significantly faster than the capacity of one's laptop to manage and process this new facility produced data. Trends indicate that this will continue to be the case for yet some time. Thus users face a quandary for how to manage today's data complexity and size as these may exceed the computing resources users have available to themselves. This same quandary can also stifle collaboration and sharing. Realizing this, some facilities are already providing web portal access to data and computing thereby providing users access to resources they need [2]. Portal based computing is now driving researchers to think about how to use the data collected at multiple facilities in an integrated way to perform their research, and also how to collaborate and share data. In the future, inter-facility data management systems will enable next tier cross-instrument-cross facility scientific research fuelled by smart applications residing upon user computer resources. We can learn from the medical imaging community that has been working since the early 1990's to integrate data from across multiple modalities to achieve

  6. Prioritizing interventions to manage polypharmacy in Australian aged care facilities.

    PubMed

    Jokanovic, Natali; Wang, Kate N; Dooley, Michael J; Lalic, Samanta; Tan, Edwin Ck; Kirkpatrick, Carl M; Bell, J Simon

    Polypharmacy is highly prevalent in residential aged care facilities (RACFs). Although polypharmacy is sometimes unavoidable, polypharmacy has been associated with increased morbidity and mortality. To identify and prioritize a range of potential interventions to manage polypharmacy in RACFs from the perspectives of health care professionals, health policy and consumer representatives. Two nominal group technique (NGT) sessions were convened in August 2015. A purposive sample (n = 19) of clinicians, researchers, managers and representatives of consumer, professional and health policy organizations were asked to nominate interventions to address the prevalence and appropriateness of medication use. Participants were then asked to prioritize five interventions suitable for possible implementation at the system level. Six of 16 potential interventions were prioritized highest for possible implementation in clinical practice, with two interventions prioritized as second highest. The top interventions in rank order were 'implementation of a pharmacist-led medication reconciliation service for new residents,' 'conduct facility-level audits and feedback to staff and health care professionals,' 'develop deprescribing scripts to assist clinician-resident discussion,' 'develop or revise prescribing guidelines specific to older people with multimorbidity in RACFs,' 'implement electronic medication charts and records' and 'better support Medication Advisory Committees (MACs) to address medication appropriateness.' This study prioritized a range of potential interventions that may be used to assist clinicians and policy makers develop a comprehensive strategy to manage polypharmacy in RACFs. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. Development of the advanced life support Systems Integration Research Facility at NASA's Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Thompson, Clifford D.

    1992-01-01

    Future NASA manned missions to the moon and Mars will require development of robust regenerative life support system technologies which offer high reliability and minimal resupply. To support the development of such systems, early ground-based test facilities will be required to demonstrate integrated, long-duration performance of candidate regenerative air revitalization, water recovery, and thermal management systems. The advanced life support Systems Integration Research Facility (SIRF) is one such test facility currently being developed at NASA's Johnson Space Center. The SIRF, when completed, will accommodate unmanned and subsequently manned integrated testing of advanced regenerative life support technologies at ambient and reduced atmospheric pressures. This paper provides an overview of the SIRF project, a top-level description of test facilities to support the project, conceptual illustrations of integrated test article configurations for each of the three SIRF systems, and a phased project schedule denoting projected activities and milestones through the next several years.

  8. Conceptual design of an in-space cryogenic fluid management facility, executive summary

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.

  9. Energy Systems Integration Facility Insight Center | Energy Systems

    Science.gov Websites

    simulation data. Photo of researchers studying data on a 3-D power system profile depicting the interaction of renewable energy resources on the grid. Capabilities The Insight Center offers the following Integration Facility Insight Center Located adjacent to the Energy System Integration Facility's High

  10. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  11. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  12. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  13. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  14. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  15. Are Health Facility Management Committees in Kenya ready to implement financial management tasks: findings from a nationally representative survey

    PubMed Central

    2013-01-01

    Background Community participation in peripheral public health facilities has in many countries focused on including community representatives in Health Facility Management Committees (HFMCs). In Kenya, HFMC roles are being expanded with the phased implementation of the Health Sector Services Fund (HSSF). Under HSSF, HFMCs manage facility funds which are dispersed directly from central level into facility bank accounts. We assessed how prepared HFMCs were to undertake this new role in advance of HSSF roll out, and considered the implications for Kenya and other similar settings. Methods Data were collected through a nationally representative sample of 248 public health centres and dispensaries in 24 districts in 2010. Data collection included surveys with in-charges (n = 248), HFMC members (n = 464) and facility users (n = 698), and record reviews. These data were supplemented by semi-structured interviews with district health managers in each district. Results Some findings supported preparedness of HFMCs to take on their new roles. Most facilities had bank accounts and HFMCs which met regularly. HFMC members and in-charges generally reported positive relationships, and HFMC members expressed high levels of motivation and job satisfaction. Challenges included users’ low awareness of HFMCs, lack of training and clarity in roles among HFMCs, and some indications of strained relations with in-charges. Such challenges are likely to be common to many similar settings, and are therefore important considerations for any health facility based initiatives involving HFMCs. Conclusion Most HFMCs have the basic requirements to operate. However to manage their own budgets effectively and meet their allocated roles in HSSF implementation, greater emphasis is needed on financial management training, targeted supportive supervision, and greater community awareness and participation. Once new budget management roles are fully established, qualitative and quantitative

  16. A Qualitative Study Investigating Facility Managers' Perceptions of the Classroom Learning Environment

    ERIC Educational Resources Information Center

    Parr, Eric Shannon

    2017-01-01

    Facility managers have the challenge of adhering to community college policies and procedures while fulfilling requirements of administration, students, and teachers concerning specific needs of classroom aesthetics. The role of facility manager and how specific entities affect perceptions of the design and implementation of classroom aesthetics…

  17. Effective and Innovative Practices for Stronger Facilities Management.

    ERIC Educational Resources Information Center

    Banick, Sarah

    2002-01-01

    Describes the five winners of the APPA's Effective & Innovative Practices Award. These facilities management programs and processes were recognized for enhancing service delivery, lowering costs, increasing productivity, improving customer service, generating revenue, or otherwise benefiting the educational institution. (EV)

  18. The changing flow of management information systems in long-term care facilities.

    PubMed

    Stokes, D F

    1997-08-01

    Over the past three decades, the long-term care community has seen continual increases in the complexity and sophistication of management information systems. These changes have been brought about by the ever-increasing demands on owners and managers to provide accurate and timely data to both regulators and financial investors. The evolution of these systems has increased rapidly in recent years as the nation attempts to reinvent the funding mechanisms for long-term care.

  19. Complying with Executive Order 13148 using the Enterprise Environmental Safety And Occupational Health Management Information System.

    PubMed

    McFarland, Michael J; Nelson, Tim M; Rasmussen, Steve L; Palmer, Glenn R; Olivas, Arthur C

    2005-03-01

    All U.S. Department of Defense (DoD) facilities are required under Executive Order (EO) 13148, "Greening the Government through Leadership in Environmental Management," to establish quality-based environmental management systems (EMSs) that support environmental decision-making and verification of continuous environmental improvement by December 31, 2005. Compliance with EO 13148 as well as other federal, state, and local environmental regulations places a significant information management burden on DoD facilities. Cost-effective management of environmental data compels DoD facilities to establish robust database systems that not only address the complex and multifaceted environmental monitoring, record-keeping, and reporting requirements demanded by these rules but enable environmental management decision-makers to gauge improvements in environmental performance. The Enterprise Environmental Safety and Occupational Health Management Information System (EESOH-MIS) is a new electronic database developed by the U.S. Air Force to manage both the data needs associated with regulatory compliance programs across its facilities as well as the non-regulatory environmental information that supports installation business practices. The U.S. Air Force, which has adopted the Plan-Do-Check-Act methodology as the EMS standard that it will employ to address EO 13148 requirements.

  20. Management of ethical issues related to care of seriously ill dialysis patients in free-standing facilities.

    PubMed

    Song, Mi-Kyung; Hanson, Laura C; Gilet, Constance A; Jo, Minjeong; Reed, Teresa J; Hladik, Gerald A

    2014-09-01

    There are few data on the frequency and current management of clinical ethical issues related to care of seriously ill dialysis patients in free-standing dialysis facilities. To examine the extent of clinical ethical challenges experienced by care providers in free-standing facilities and their perceptions about how those issues are managed. A total of 183 care providers recruited from 15 facilities in North Carolina completed a survey regarding the occurrence and management of ethical issues in the past year. Care plan meetings were observed at four of the facilities for three consecutive months. Also, current policies and procedures at each of the facilities were reviewed. The two most frequently experienced challenges involved dialyzing frail patients with multiple comorbidities and caring for disruptive/difficult patients. The most common ways of managing ethical issues were discussions in care plan meetings (n = 47) or discussions with the clinic manager (n = 47). Although policies were in place to guide management of some of the challenges, respondents were often not aware of those policies. Also, although participants reported that ethical issues related to dialyzing undocumented immigrants were fairly common, no facility had a policy for managing this challenge. Participants suggested that all staff obtain training in clinical ethics and communication skills, facilities develop ethics teams, and there be clear policies to guide management of ethical challenges. The scope of ethical challenges was extensive, how these challenges were managed varied widely, and there were limited resources for assistance. Multifaceted efforts, encompassing endeavors at the individual, facility, organization, and national levels, are needed to support staff in improving the management of ethical challenges in dialysis facilities. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  1. Piloting laboratory quality system management in six health facilities in Nigeria.

    PubMed

    Mbah, Henry; Ojo, Emmanuel; Ameh, James; Musuluma, Humphrey; Negedu-Momoh, Olubunmi Ruth; Jegede, Feyisayo; Ojo, Olufunmilayo; Uwakwe, Nkem; Ochei, Kingsley; Dada, Michael; Udah, Donald; Chiegil, Robert; Torpey, Kwasi

    2014-01-01

    Achieving accreditation in laboratories is a challenge in Nigeria like in most African countries. Nigeria adopted the World Health Organization Regional Office for Africa Stepwise Laboratory (Quality) Improvement Process Towards Accreditation (WHO/AFRO- SLIPTA) in 2010. We report on FHI360 effort and progress in piloting WHO-AFRO recognition and accreditation preparedness in six health facility laboratories in five different states of Nigeria. Laboratory assessments were conducted at baseline, follow up and exit using the WHO/AFRO- SLIPTA checklist. From the total percentage score obtained, the quality status of laboratories were classified using a zero to five star rating, based on the WHO/AFRO quality improvement stepwise approach. Major interventions include advocacy, capacity building, mentorship and quality improvement projects. At baseline audit, two of the laboratories attained 1- star while the remaining four were at 0- star. At follow up audit one lab was at 1- star, two at 3-star and three at 4-star. At exit audit, four labs were at 4- star, one at 3-star and one at 2-star rating. One laboratory dropped a 'star' at exit audit, while others consistently improved. The two weakest elements at baseline; internal audit (4%) and occurrence/incidence management (15%) improved significantly, with an exit score of 76% and 81% respectively. The elements facility and safety was the major strength across board throughout the audit exercise. This effort resulted in measurable and positive impact on the laboratories. We recommend further improvement towards a formal international accreditation status and scale up of WHO/AFRO- SLIPTA implementation in Nigeria.

  2. Assessment of management policies and practices for occupational exposure to bloodborne pathogens in dialysis facilities.

    PubMed

    Mbaeyi, Chukwuma; Panlilio, Adelisa L; Hobbs, Cynthia; Patel, Priti R; Kuhar, David T

    2012-10-01

    Occupational exposure management is an important element in preventing the transmission of bloodborne pathogens in health care settings. In 2008, the US Centers for Disease Control and Prevention conducted a survey to assess procedures for managing occupational bloodborne pathogen exposures in outpatient dialysis facilities in the United States. A cross-sectional survey of randomly selected outpatient dialysis facilities. 339 outpatient dialysis facilities drawn from the 2006 US end-stage renal disease database. Hospital affiliation (free-standing vs hospital-based facilities), profit status (for-profit vs not-for-profit facilities), and number of health care personnel (≥100 vs <100 health care personnel). Exposures to hepatitis B virus (HBV), hepatitis C virus (HCV), and human immunodeficiency virus (HIV); provision of HBV and HIV postexposure prophylaxis. We calculated the proportion of facilities reporting occupational bloodborne pathogen exposures and offering occupational exposure management services. We analyzed bloodborne pathogen exposures and provision of postexposure prophylaxis by facility type. Nearly all respondents (99.7%) had written policies and 95% provided occupational exposure management services to health care personnel during the daytime on weekdays, but services were provided infrequently during other periods of the week. Approximately 10%-15% of facilities reported having HIV, HBV, or HCV exposures in health care personnel in the 12 months prior to the survey, but inconsistencies were noted in procedures for managing such exposures. Despite 86% of facilities providing HIV prophylaxis for exposed health care personnel, only 37% designated a primary HIV postexposure prophylaxis regimen. For-profit and free-standing facilities reported fewer exposures, but did not as reliably offer HBV prophylaxis or have a primary HIV postexposure prophylaxis regimen relative to not-for-profit and hospital-based facilities. The survey response rate was low

  3. EPA Facility Registry Service (FRS): NEI

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the National Emissions Inventory (NEI) Program dataset. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs

  4. Alignment system for SGII-Up laser facility

    NASA Astrophysics Data System (ADS)

    Gao, Yanqi; Cui, Yong; Li, Hong; Gong, Lei; Lin, Qiang; Liu, Daizhong; Zhu, Baoqiang; Ma, Weixin; Zhu, Jian; Lin, Zunqi

    2018-03-01

    The SGII-Up laser facility in Shanghai is one of the most important high-power laser facilities in China. It is designed to obtain 24 kJ (3ω) of energy with a square pulse of 3 ns using eight laser beams (two bundles). To satisfy the requirements for the safety, efficiency, and quality, an alignment system is developed for this facility. This alignment system can perform automatic alignment of the preamplifier system, main amplifier system, and harmonic conversion system within 30 min before every shot during the routine operation of the facility. In this article, an overview of the alignment system is first presented. Then, its alignment characteristics are discussed, along with the alignment process. Finally, experimental results, including the alignment results and the facility performance, are reported. The results show that the far-field beam pointing alignment accuracy is better than 3 μrad, and the alignment error of the near-field beam centering is no larger than 1 mm. These satisfy the design requirements very well.

  5. Deep Space Network equipment performance, reliability, and operations management information system

    NASA Technical Reports Server (NTRS)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  6. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  7. EPA Facility Registry Service (FRS): CERCLIS

    EPA Pesticide Factsheets

    This data provides location and attribute information on Facilities regulated under the Comprehensive Environmental Responsibility Compensation and Liability Information System (CERCLIS) for a intranet web feature service . The data provided in this service are obtained from EPA's Facility Registry Service (FRS). The FRS is an integrated source of comprehensive (air, water, and waste) environmental information about facilities, sites or places. This service connects directly to the FRS database to provide this data as a feature service. FRS creates high-quality, accurate, and authoritative facility identification records through rigorous verification and management procedures that incorporate information from program national systems, state master facility records, data collected from EPA's Central Data Exchange registrations and data management personnel. Additional Information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.

  8. Systems test facilities existing capabilities compilation

    NASA Technical Reports Server (NTRS)

    Weaver, R.

    1981-01-01

    Systems test facilities (STFS) to test total photovoltaic systems and their interfaces are described. The systems development (SD) plan is compilation of existing and planned STFs, as well as subsystem and key component testing facilities. It is recommended that the existing capabilities compilation is annually updated to provide and assessment of the STF activity and to disseminate STF capabilities, status and availability to the photovoltaics program.

  9. Management of Diabetes in Long-term Care and Skilled Nursing Facilities: A Position Statement of the American Diabetes Association

    PubMed Central

    Florez, Hermes; Huang, Elbert S.; Kalyani, Rita R.; Mupanomunda, Maria; Pandya, Naushira; Swift, Carrie S.; Taveira, Tracey H.; Haas, Linda B.

    2016-01-01

    Diabetes is more common in older adults, has a high prevalence in long-term care (LTC) facilities, and is associated with significant disease burden and higher cost. The heterogeneity of this population with regard to comorbidities and overall health status is critical to establishing personalized goals and treatments for diabetes. The risk of hypoglycemia is the most important factor in determining glycemic goals due to the catastrophic consequences in this population. Simplified treatment regimens are preferred, and the sole use of sliding scale insulin (SSI) should be avoided. This position statement provides a classification system for older adults in LTC settings, describes how diabetes goals and management should be tailored based on comorbidities, delineates key issues to consider when using glucose-lowering agents in this population, and provides recommendations on how to replace SSI in LTC facilities. As these patients transition from one setting to another, or from one provider to another, their risk for adverse events increases. Strategies are presented to reduce these risks and ensure safe transitions. This article addresses diabetes management at end of life and in those receiving palliative and hospice care. The integration of diabetes management into LTC facilities is important and requires an interprofessional team approach. To facilitate this approach, acceptance by administrative personnel is needed, as are protocols and possibly system changes. It is important for clinicians to understand the characteristics, challenges, and barriers related to the older population living in LTC facilities as well as the proper functioning of the facilities themselves. Once these challenges are identified, individualized approaches can be designed to improve diabetes management while lowering the risk of hypoglycemia and ultimately improving quality of life. PMID:26798150

  10. An optimization-based approach for facility energy management with uncertainties, and, Power portfolio optimization in deregulated electricity markets with risk management

    NASA Astrophysics Data System (ADS)

    Xu, Jun

    Topic 1. An Optimization-Based Approach for Facility Energy Management with Uncertainties. Effective energy management for facilities is becoming increasingly important in view of the rising energy costs, the government mandate on the reduction of energy consumption, and the human comfort requirements. This part of dissertation presents a daily energy management formulation and the corresponding solution methodology for HVAC systems. The problem is to minimize the energy and demand costs through the control of HVAC units while satisfying human comfort, system dynamics, load limit constraints, and other requirements. The problem is difficult in view of the fact that the system is nonlinear, time-varying, building-dependent, and uncertain; and that the direct control of a large number of HVAC components is difficult. In this work, HVAC setpoints are the control variables developed on top of a Direct Digital Control (DDC) system. A method that combines Lagrangian relaxation, neural networks, stochastic dynamic programming, and heuristics is developed to predict the system dynamics and uncontrollable load, and to optimize the setpoints. Numerical testing and prototype implementation results show that our method can effectively reduce total costs, manage uncertainties, and shed the load, is computationally efficient. Furthermore, it is significantly better than existing methods. Topic 2. Power Portfolio Optimization in Deregulated Electricity Markets with Risk Management. In a deregulated electric power system, multiple markets of different time scales exist with various power supply instruments. A load serving entity (LSE) has multiple choices from these instruments to meet its load obligations. In view of the large amount of power involved, the complex market structure, risks in such volatile markets, stringent constraints to be satisfied, and the long time horizon, a power portfolio optimization problem is of critical importance but difficulty for an LSE to serve the

  11. Soil and crop management experiments in the Laboratory Biosphere: an analogue system for the Mars on Earth(R) facility.

    PubMed

    Silverstone, S; Nelson, M; Alling, A; Allen, J P

    2005-01-01

    During the years 2002 and 2003, three closed system experiments were carried out in the "Laboratory Biosphere" facility located in Santa Fe, New Mexico. The program involved experimentation of "Hoyt" Soy Beans, (experiment #1) USU Apogee Wheat (experiment #2) and TU-82-155 sweet potato (experiment #3) using a 5.37 m2 soil planting bed which was 30 cm deep. The soil texture, 40% clay, 31% sand and 28% silt (a clay loam), was collected from an organic farm in New Mexico to avoid chemical residues. Soil management practices involved minimal tillage, mulching, returning crop residues to the soil after each experiment and increasing soil biota by introducing worms, soil bacteria and mycorrhizae fungi. High soil pH of the original soil appeared to be a factor affecting the first two experiments. Hence, between experiments #2 and #3, the top 15 cm of the soil was amended using a mix of peat moss, green sand, humates and pumice to improve soil texture, lower soil pH and increase nutrient availability. This resulted in lowering the initial pH of 8.0-6.7 at the start of experiment #3. At the end of the experiment, the pH was 7.6. Soil nitrogen and phosphorus has been adequate, but some chlorosis was evident in the first two experiments. Aphid infestation was the only crop pest problem during the three experiments and was handled using an introduction of Hyppodamia convergens. Experimentation showed there were environmental differences even in this 1200 cubic foot ecological system facility, such as temperature and humidity gradients because of ventilation and airflow patterns which resulted in consequent variations in plant growth and yield. Additional humidifiers were added to counteract low humidity and helped optimize conditions for the sweet potato experiment. The experience and information gained from these experiments are being applied to the future design of the Mars On Earth(R) facility (Silverstone et al., Development and research program for a soil

  12. Soil and crop management experiments in the Laboratory Biosphere: An analogue system for the Mars on Earth ® facility

    NASA Astrophysics Data System (ADS)

    Silverstone, S.; Nelson, M.; Alling, A.; Allen, J. P.

    During the years 2002 and 2003, three closed system experiments were carried out in the "Laboratory Biosphere" facility located in Santa Fe, New Mexico. The program involved experimentation of "Hoyt" Soy Beans, (experiment #1) USU Apogee Wheat (experiment #2) and TU-82-155 sweet potato (experiment #3) using a 5.37 m 2 soil planting bed which was 30 cm deep. The soil texture, 40% clay, 31% sand and 28% silt (a clay loam), was collected from an organic farm in New Mexico to avoid chemical residues. Soil management practices involved minimal tillage, mulching, returning crop residues to the soil after each experiment and increasing soil biota by introducing worms, soil bacteria and mycorrhizae fungi. High soil pH of the original soil appeared to be a factor affecting the first two experiments. Hence, between experiments #2 and #3, the top 15 cm of the soil was amended using a mix of peat moss, green sand, humates and pumice to improve soil texture, lower soil pH and increase nutrient availability. This resulted in lowering the initial pH of 8.0-6.7 at the start of experiment #3. At the end of the experiment, the pH was 7.6. Soil nitrogen and phosphorus has been adequate, but some chlorosis was evident in the first two experiments. Aphid infestation was the only crop pest problem during the three experiments and was handled using an introduction of Hyppodamia convergens. Experimentation showed there were environmental differences even in this 1200 cubic foot ecological system facility, such as temperature and humidity gradients because of ventilation and airflow patterns which resulted in consequent variations in plant growth and yield. Additional humidifiers were added to counteract low humidity and helped optimize conditions for the sweet potato experiment. The experience and information gained from these experiments are being applied to the future design of the Mars On Earth ® facility (Silverstone et al., Development and research program for a soil

  13. Integrated water management system - Description and test results. [for Space Station waste water processing

    NASA Technical Reports Server (NTRS)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  14. Naval Air Systems Command Mobile Facility Program

    DTIC Science & Technology

    2009-11-03

    Julie Trossbach 301-757-3073 Database Manager – Emi McCutcheon 301-757- 8347 BFM – Michelle Moorman 301-757-8328 Comptroller Analyst – Kathy...Jamie McDonald (757) 444-1428 NAVAIR Mobile Facilities MFTool/Database AIR 6.7.6.2 Emi McCutcheon (301) 757-8347 NAVAIR Mobile Facilities Logistics...requirement for mobile trailer -type vans for peculiar jet aircraft maintenance – Needed dust free, temperature & humidity-controlled maintenance

  15. Data Base Management Systems Panel Workshop: Executive summary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Data base management systems (DBMS) for space acquired and associated data are discussed. The full range of DBMS needs is covered including acquiring, managing, storing, archiving, accessing and dissemination of data for an application. Existing bottlenecks in DBMS operations, expected developments in the field of remote sensing, communications, and computer science are discussed, and an overview of existing conditions and expected problems is presented. The requirements for a proposed spatial information system and characteristics of a comprehensive browse facility for earth observations applications are included.

  16. EPA FRS Facilities Combined File CSV Download for the Marshall Islands

    EPA Pesticide Factsheets

    The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.

  17. EPA FRS Facilities Single File CSV Download for the Marshall Islands

    EPA Pesticide Factsheets

    The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.

  18. Management of Excess Material in the Navys Real Time Reutilization Asset Management Facilities Needs Improvement

    DTIC Science & Technology

    2017-01-23

    operations for financial and supply chain management . ii │ DODIG-2017-043 ( Project No. D2016-D000RD-0052.000) Results in Brief Management of Excess...following page. Recommendations (cont’d) DODIG-2017-043 ( Project No. D2016-D000RD-0052.000) │ iii Recommendations Table Management Recommendations...No. DODIG-2017-043 J A N U A R Y 2 3 , 2 0 1 7 Management of Excess Material in the Navy’s Real-Time Reutilization Asset Management Facilities

  19. Supervisory control and diagnostics system for the mirror fusion test facility: overview and status 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGoldrick, P.R.

    1981-01-01

    The Mirror Fusion Test Facility (MFTF) is a complex facility requiring a highly-computerized Supervisory Control and Diagnostics System (SCDS) to monitor and provide control over ten subsystems; three of which require true process control. SCDS will provide physicists with a method of studying machine and plasma behavior by acquiring and processing up to four megabytes of plasma diagnostic information every five minutes. A high degree of availability and throughput is provided by a distributed computer system (nine 32-bit minicomputers on shared memory). Data, distributed across SCDS, is managed by a high-bandwidth Distributed Database Management System. The MFTF operators' control roommore » consoles use color television monitors with touch sensitive screens; this is a totally new approach. The method of handling deviations to normal machine operation and how the operator should be notified and assisted in the resolution of problems has been studied and a system designed.« less

  20. Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.

    2005-02-01

    This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  1. Evaluating malaria case management at public health facilities in two provinces in Angola.

    PubMed

    Plucinski, Mateusz M; Ferreira, Manzambi; Ferreira, Carolina Miguel; Burns, Jordan; Gaparayi, Patrick; João, Lubaki; da Costa, Olinda; Gill, Parambir; Samutondo, Claudete; Quivinja, Joltim; Mbounga, Eliane; de León, Gabriel Ponce; Halsey, Eric S; Dimbu, Pedro Rafael; Fortes, Filomeno

    2017-05-03

    Malaria accounts for the largest portion of healthcare demand in Angola. A pillar of malaria control in Angola is the appropriate management of malaria illness, including testing of suspect cases with rapid diagnostic tests (RDTs) and treatment of confirmed cases with artemisinin-based combination therapy (ACT). Periodic systematic evaluations of malaria case management are recommended to measure health facility readiness and adherence to national case management guidelines. Cross-sectional health facility surveys were performed in low-transmission Huambo and high-transmission Uíge Provinces in early 2016. In each province, 45 health facilities were randomly selected from among all public health facilities stratified by level of care. Survey teams performed inventories of malaria commodities and conducted exit interviews and re-examinations, including RDT testing, of a random selection of all patients completing outpatient consultations. Key health facility readiness and case management indicators were calculated adjusting for the cluster sampling design and utilization. Availability of RDTs or microscopy on the day of the survey was 71% (54-83) in Huambo and 85% (67-94) in Uíge. At least one unit dose pack of one formulation of an ACT (usually artemether-lumefantrine) was available in 83% (66-92) of health facilities in Huambo and 79% (61-90) of health facilities in Uíge. Testing rates of suspect malaria cases in Huambo were 30% (23-38) versus 69% (53-81) in Uíge. Overall, 28% (13-49) of patients with uncomplicated malaria, as determined during the re-examination, were appropriately treated with an ACT with the correct dose in Huambo, compared to 60% (42-75) in Uíge. Incorrect case management of suspect malaria cases was associated with lack of healthcare worker training in Huambo and ACT stock-outs in Uíge. The results reveal important differences between provinces. Despite similar availability of testing and ACT, testing and treatment rates were lower in

  2. Progress towards implementation of ACT malaria case-management in public health facilities in the Republic of Sudan: a cluster-sample survey

    PubMed Central

    2012-01-01

    Background Effective malaria case-management based on artemisinin-based combination therapy (ACT) and parasitological diagnosis is a major pillar within the 2007-2012 National Malaria Strategic Plan in the Sudan. Three years after the launch of the strategy a health facility survey was undertaken to evaluate case-management practices and readiness of the health facilities and health workers to implement a new malaria case-management strategy. Methods A cross-sectional, cluster sample survey was undertaken at public health facilities in 15 states of Sudan. Data were collected using quality-of-care assessment methods. The main outcomes were the proportions of facilities with ACTs and malaria diagnostics; proportions of health workers exposed to malaria related health systems support activities; and composite and individual indicators of case-management practices for febrile outpatients stratified by age, availability of ACTs and diagnostics, use of malaria diagnostics, and test result. Results We evaluated 244 facilities, 294 health workers and 1,643 consultations for febrile outpatients (425 < 5 years and 1,218 ≥ 5 years). Health facility and health worker readiness was variable: chloroquine was available at only 5% of facilities, 73% stocked recommended artesunate and sulfadoxine/pyrimethamine (AS+SP), 51% had the capacity to perform parasitological diagnosis, 53% of health workers had received in-service training on ACTs, 24% were trained in the use of malaria Rapid Diagnostic Tests, and 19% had received a supervisory visit including malaria case-management. At all health facilities 46% of febrile patients were parasitologically tested and 35% of patients were both, tested and treated according to test result. At facilities where AS+SP and malaria diagnostics were available 66% of febrile patients were tested and 51% were both, tested and treated according to test result. Among test positive patients 64% were treated with AS+SP but 24% were treated with

  3. NASA Data Acquisition System Software Development for Rocket Propulsion Test Facilities

    NASA Technical Reports Server (NTRS)

    Herbert, Phillip W., Sr.; Elliot, Alex C.; Graves, Andrew R.

    2015-01-01

    Current NASA propulsion test facilities include Stennis Space Center in Mississippi, Marshall Space Flight Center in Alabama, Plum Brook Station in Ohio, and White Sands Test Facility in New Mexico. Within and across these centers, a diverse set of data acquisition systems exist with different hardware and software platforms. The NASA Data Acquisition System (NDAS) is a software suite designed to operate and control many critical aspects of rocket engine testing. The software suite combines real-time data visualization, data recording to a variety formats, short-term and long-term acquisition system calibration capabilities, test stand configuration control, and a variety of data post-processing capabilities. Additionally, data stream conversion functions exist to translate test facility data streams to and from downstream systems, including engine customer systems. The primary design goals for NDAS are flexibility, extensibility, and modularity. Providing a common user interface for a variety of hardware platforms helps drive consistency and error reduction during testing. In addition, with an understanding that test facilities have different requirements and setups, the software is designed to be modular. One engine program may require real-time displays and data recording; others may require more complex data stream conversion, measurement filtering, or test stand configuration management. The NDAS suite allows test facilities to choose which components to use based on their specific needs. The NDAS code is primarily written in LabVIEW, a graphical, data-flow driven language. Although LabVIEW is a general-purpose programming language; large-scale software development in the language is relatively rare compared to more commonly used languages. The NDAS software suite also makes extensive use of a new, advanced development framework called the Actor Framework. The Actor Framework provides a level of code reuse and extensibility that has previously been difficult

  4. Medical Waste Management Implications for Small Medical Facilities.

    ERIC Educational Resources Information Center

    Byrns, George; Burke, Thomas

    1992-01-01

    Discusses the implications of the Medical Waste Management Act of 1988 for small medical facilities, public health, and the environment. Reviews health and environmental risks associated with medical waste, current regulatory approaches, and classifications. Concludes that the health risk of medical wastes has been overestimated; makes…

  5. Summary: The Need for More Effective Facilities Management.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Comprehensive facilities management is seen as becoming an important factor in higher education. Alternatives to new construction exist in the form of rehabilitation and renovation; deferred maintenance must be addressed and gradually reduced; better use of space must occur through diversion of surplus space, increased utilization, and…

  6. EPA Facility Registry Service (FRS): CAMDBS

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Clean Air Markets Division Business System (CAMDBS). Administered by the EPA Clean Air Markets Division, within the Office of Air and Radiation, CAMDBS supports the implementation of market-based air pollution control programs, including the Acid Rain Program and regional programs designed to reduce the transport of ozone. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to CAMDBS facilities once the CAMDBS data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.

  7. An operations management system for the Space Station

    NASA Astrophysics Data System (ADS)

    Savage, Terry R.

    A description is provided of an Operations Management System (OMS) for the planned NASA Space Station. The OMS would be distributed both in space and on the ground, and provide a transparent interface to the communications and data processing facilities of the Space Station Program. The allocation of OMS responsibilities has, in the most current Space Station design, been fragmented among the Communications and Tracking Subsystem (CTS), the Data Management System (DMS), and a redefined OMS. In this current view, OMS is less of a participant in the real-time processing, and more an overseer of the health and management of the Space Station operations.

  8. Centrifuge Facility Conceptual System Study. Volume 1: Facility overview and habitats

    NASA Technical Reports Server (NTRS)

    Synnestvedt, Robert (Editor)

    1990-01-01

    The results are presented for a NASA Phase 1 study conducted from mid 1987 through mid 1989 at Ames Research Center. The Centrifuge Facility is the major element of the biological research facility for the implementation of NASA's Life Science Research Program on Space Station Freedom using non-human specimens (such as small primates, rodents, plants, insects, cell tissues). Five systems are described which comprise the Facility: habitats, holding units, centrifuge, glovebox, and service unit. Volume 1 presents a facility overview and describes the habitats - modular units which house living specimens.

  9. Research on the Construction Management and Sustainable Development of Large-Scale Scientific Facilities in China

    NASA Astrophysics Data System (ADS)

    Guiquan, Xi; Lin, Cong; Xuehui, Jin

    2018-05-01

    As an important platform for scientific and technological development, large -scale scientific facilities are the cornerstone of technological innovation and a guarantee for economic and social development. Researching management of large-scale scientific facilities can play a key role in scientific research, sociology and key national strategy. This paper reviews the characteristics of large-scale scientific facilities, and summarizes development status of China's large-scale scientific facilities. At last, the construction, management, operation and evaluation of large-scale scientific facilities is analyzed from the perspective of sustainable development.

  10. Downgrading Nuclear Facilities to Radiological Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarry, Jeffrey F.; Farr, Jesse Oscar; Duran, Leroy

    2015-08-01

    Based on inventory reductions and the use of alternate storage facilities, the Sandia National Laboratories (SNL) downgraded 4 SNL Hazard Category 3 (HC-3) nuclear facilities to less-than-HC-3 radiological facilities. SNL’s Waste Management and Pollution Prevention Department (WMPPD) managed the HC-3 nuclear facilities and implemented the downgrade. This paper will examine the downgrade process,

  11. Crises and Resilience at the Frontline-Public Health Facility Managers under Devolution in a Sub-County on the Kenyan Coast.

    PubMed

    Nyikuri, Mary; Tsofa, Benjamin; Barasa, Edwine; Okoth, Philip; Molyneux, Sassy

    2015-01-01

    Public primary health care (PHC) facilities are for many individuals the first point of contact with the formal health care system. These facilities are managed by professional nurses or clinical officers who are recognised to play a key role in implementing health sector reforms and facilitating initiatives aimed at strengthening community involvement. Little in-depth research exists about the dimensions and challenges of these managers' jobs, or on the impact of decentralisation on their roles and responsibilities. In this paper, we describe the roles and responsibilities of PHC managers-or 'in-charges' in Kenya, and their challenges and coping strategies, under accelerated devolution. The data presented in this paper is part of a wider set of activities aimed at understanding governance changes under devolution in Kenya, under the umbrella of a 'learning site'. A learning site is a long term process of collaboration between health managers and researchers deciding together on key health system questions and interventions. Data were collected through seven formal in depth interviews and observations at four PHC facilities as well as eight in depth interviews and informal interactions with sub-county managers from June 2013 to July 2014. Drawing on the Aragon framework of organisation capacity we discuss the multiple accountabilities, daily routines, challenges and coping strategies among PHC facility managers. PHC in-charges perform complex and diverse roles in a difficult environment with relatively little formal preparation. Their key concerns are lack of job clarity and preparedness, the difficulty of balancing multidirectional accountability responsibilities amidst significant resource shortages, and remuneration anxieties. We show that day-to-day management in an environment of resource constraints and uncertainty requires PHC in-charges who are resilient, reflective, and continuously able to learn and adapt. We highlight the importance of leadership

  12. 75 FR 23843 - Discretionary Bus and Bus Facilities Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... transit facilities and equipment. d. For facilities, evidence of proposed project compliance with ``Green Building'' certification. 3. For transit asset management system projects: If asset management system...-New York, Administrator, Region 7-Kansas One Bowling Green, Room 429, New City, MO, 901 Locust Street...

  13. Photovoltaic Systems Test Facilities: Existing capabilities compilation

    NASA Technical Reports Server (NTRS)

    Volkmer, K.

    1982-01-01

    A general description of photovoltaic systems test facilities (PV-STFs) operated under the U.S. Department of Energy's photovoltaics program is given. Descriptions of a number of privately operated facilities having test capabilities appropriate to photovoltaic hardware development are given. A summary of specific, representative test capabilities at the system and subsystem level is presented for each listed facility. The range of system and subsystem test capabilities available to serve the needs of both the photovoltaics program and the private sector photovoltaics industry is given.

  14. a System Dynamics Model to Study the Importance of Infrastructure Facilities on Quality of Primary Education System in Developing Countries

    NASA Astrophysics Data System (ADS)

    Pedamallu, Chandra Sekhar; Ozdamar, Linet; Weber, Gerhard-Wilhelm; Kropat, Erik

    2010-06-01

    The system dynamics approach is a holistic way of solving problems in real-time scenarios. This is a powerful methodology and computer simulation modeling technique for framing, analyzing, and discussing complex issues and problems. System dynamics modeling and simulation is often the background of a systemic thinking approach and has become a management and organizational development paradigm. This paper proposes a system dynamics approach for study the importance of infrastructure facilities on quality of primary education system in developing nations. The model is proposed to be built using the Cross Impact Analysis (CIA) method of relating entities and attributes relevant to the primary education system in any given community. We offer a survey to build the cross-impact correlation matrix and, hence, to better understand the primary education system and importance of infrastructural facilities on quality of primary education. The resulting model enables us to predict the effects of infrastructural facilities on the access of primary education by the community. This may support policy makers to take more effective actions in campaigns.

  15. EPA Facility Registry Service (FRS): ICIS

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Integrated Compliance Information System (ICIS). When complete, ICIS will provide a database that will contain integrated enforcement and compliance information across most of EPA's programs. The vision for ICIS is to replace EPA's independent databases that contain enforcement data with a single repository for that information. Currently, ICIS contains all Federal Administrative and Judicial enforcement actions and a subset of the Permit Compliance System (PCS), which supports the National Pollutant Discharge Elimination System (NPDES). ICIS exchanges non-sensitive enforcement/compliance activities, non-sensitive formal enforcement actions and NPDES information with FRS. This web feature service contains the enforcement/compliance activities and formal enforcement action related facilities; the NPDES facilities are contained in the PCS_NPDES web feature service. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on f

  16. Management of Diabetes in Long-term Care and Skilled Nursing Facilities: A Position Statement of the American Diabetes Association.

    PubMed

    Munshi, Medha N; Florez, Hermes; Huang, Elbert S; Kalyani, Rita R; Mupanomunda, Maria; Pandya, Naushira; Swift, Carrie S; Taveira, Tracey H; Haas, Linda B

    2016-02-01

    Diabetes is more common in older adults, has a high prevalence in long-term care (LTC) facilities, and is associated with significant disease burden and higher cost. The heterogeneity of this population with regard to comorbidities and overall health status is critical to establishing personalized goals and treatments for diabetes. The risk of hypoglycemia is the most important factor in determining glycemic goals due to the catastrophic consequences in this population. Simplified treatment regimens are preferred, and the sole use of sliding scale insulin (SSI) should be avoided. This position statement provides a classification system for older adults in LTC settings, describes how diabetes goals and management should be tailored based on comorbidities, delineates key issues to consider when using glucose-lowering agents in this population, and provides recommendations on how to replace SSI in LTC facilities. As these patients transition from one setting to another, or from one provider to another, their risk for adverse events increases. Strategies are presented to reduce these risks and ensure safe transitions. This article addresses diabetes management at end of life and in those receiving palliative and hospice care. The integration of diabetes management into LTC facilities is important and requires an interprofessional team approach. To facilitate this approach, acceptance by administrative personnel is needed, as are protocols and possibly system changes. It is important for clinicians to understand the characteristics, challenges, and barriers related to the older population living in LTC facilities as well as the proper functioning of the facilities themselves. Once these challenges are identified, individualized approaches can be designed to improve diabetes management while lowering the risk of hypoglycemia and ultimately improving quality of life. © 2016 by the American Diabetes Association. Readers may use this article as long as the work is properly

  17. Science facilities and stakeholder management: how a pan-European research facility ended up in a small Swedish university town

    NASA Astrophysics Data System (ADS)

    Thomasson, Anna; Carlile, Colin

    2017-06-01

    This is the story of how a large research facility of broad European and global interest, the European Spallation Source (ESS), ended up in the small university town of Lund in Sweden. This happened in spite of the fact that a number of influential European countries were at one time or another competitors to host the facility. It is also a story about politics which attempts to illustrate how closely intertwined politics and science are, and how the interplay between those interests affects scientific progress. ESS became an arena for individual ambitions and political manoeuvring. The different stakeholders, in their striving to ensure that their own interests were realised, in various ways and with different degrees of success over the years, have influenced the key decisions that, during the already 30 year history of ESS, have driven the course that this project has taken. What emerges is that the interests of the stakeholders and the interests of the project itself are frequently not in harmony. This imposes challenges on the management of large research facilities as they have to not only navigate in the scientific landscape, which they often are more familiar with, but also in the political landscape. This story is therefore an attempt to shed light on the role of managers of large research facilities and the often delicate balancing act they have to perform when trying to comply with the different and often conflicting stakeholder interests. What is especially worthwhile examining, as we do in this paper, is the role that individuals, and the interaction between individuals, have played in the process. This shows that the focus of stakeholder theory on organisations, rather than the people in the organisations, needs to be redirected on to the individuals representing those organisations and their inter-relationships. At the same time it is clear that the developing field of stakeholder management theory has not emerged into the consciousness of science

  18. 40 CFR 792.43 - Test system care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Test system care facilities. 792.43 Section 792.43 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Facilities § 792.43 Test system care facilities...

  19. The INFN-CNAF Tier-1 GEMSS Mass Storage System and database facility activity

    NASA Astrophysics Data System (ADS)

    Ricci, Pier Paolo; Cavalli, Alessandro; Dell'Agnello, Luca; Favaro, Matteo; Gregori, Daniele; Prosperini, Andrea; Pezzi, Michele; Sapunenko, Vladimir; Zizzi, Giovanni; Vagnoni, Vincenzo

    2015-05-01

    The consolidation of Mass Storage services at the INFN-CNAF Tier1 Storage department that has occurred during the last 5 years, resulted in a reliable, high performance and moderately easy-to-manage facility that provides data access, archive, backup and database services to several different use cases. At present, the GEMSS Mass Storage System, developed and installed at CNAF and based upon an integration between the IBM GPFS parallel filesystem and the Tivoli Storage Manager (TSM) tape management software, is one of the largest hierarchical storage sites in Europe. It provides storage resources for about 12% of LHC data, as well as for data of other non-LHC experiments. Files are accessed using standard SRM Grid services provided by the Storage Resource Manager (StoRM), also developed at CNAF. Data access is also provided by XRootD and HTTP/WebDaV endpoints. Besides these services, an Oracle database facility is in production characterized by an effective level of parallelism, redundancy and availability. This facility is running databases for storing and accessing relational data objects and for providing database services to the currently active use cases. It takes advantage of several Oracle technologies, like Real Application Cluster (RAC), Automatic Storage Manager (ASM) and Enterprise Manager centralized management tools, together with other technologies for performance optimization, ease of management and downtime reduction. The aim of the present paper is to illustrate the state-of-the-art of the INFN-CNAF Tier1 Storage department infrastructures and software services, and to give a brief outlook to forthcoming projects. A description of the administrative, monitoring and problem-tracking tools that play a primary role in managing the whole storage framework is also given.

  20. Stress and Coping among Owners and Managers of Residential Care Facilities.

    ERIC Educational Resources Information Center

    Walker, Hollie; And Others

    Stress and burnout are common in the caregiving professions. Stress negatively affects both the caregivers and patients. In order to help caregivers deal with stress effectively and to improve the care in residential care facilities, it is essential to learn more about the particular stressors that managers of such facilities experience. In this…

  1. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the

  2. EPA Facility Registry Service (FRS): PCS_NPDES

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Permit Compliance System (PCS) or the National Pollutant Discharge Elimination System (NPDES) module of the Integrated Compliance Information System (ICIS). PCS tracks NPDES surface water permits issued under the Clean Water Act. This system is being incrementally replaced by the NPDES module of ICIS. Under NPDES, all facilities that discharge pollutants from any point source into waters of the United States are required to obtain a permit. The permit will likely contain limits on what can be discharged, impose monitoring and reporting requirements, and include other provisions to ensure that the discharge does not adversely affect water quality. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NPDES facilities once the PCS or ICIS-NPDES data has been integrated into the FRS database. Additional information on FRS is available

  3. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  4. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  5. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  6. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  7. Design for perception management system on offshore reef based on integrated management

    NASA Astrophysics Data System (ADS)

    Peng, Li; Qiankun, Wang

    2017-06-01

    According to an analysis of actual monitoring demands using integrated management and information technology, a quad monitoring system is proposed to provide intelligent perception of offshore reefs, including indoor building environments, architectural structures, and facilities and perimeter integrity. This will strengthen the ability to analyse and evaluate offshore reef operation and health, promoting efficiency in decision making.

  8. Report: transboundary hazardous waste management. part II: performance auditing of treatment facilities in importing countries.

    PubMed

    Chang, Tien-Chin; Ni, Shih-Piao; Fan, Kuo-Shuh; Lee, Ching-Hwa

    2006-06-01

    Before implementing the self-monitoring model programme of the Basel Convention in the Asia, Taiwan has conducted a comprehensive 4-year follow-up project to visit the governmental authorities and waste-disposal facilities in the countries that import waste from Taiwan. A total of nine treatment facilities, six of which are reported in this paper, and the five countries where the plants are located were visited in 2001-2002. France, Belgium and Finland primarily handled polychlorinated biphenyl capacitors, steel mill dust and metal waste. The United States accepted metal sludge, mainly electroplating sludge, from Taiwan. Waste printed circuit boards, waste wires and cables, and a mixture of waste metals and electronics were the major items exported to China. Relatively speaking, most treatment plants for hazardous waste paid close attention to environmental management, such as pollution control and monitoring, site zoning, system management regarding occupational safety and hygiene, data management, permits application, and image promotion. Under the tight restrictions formulated by the central environment agency, waste treatment plants in China managed the environmental issues seriously. For example, one of the treatment plants had ISO 14001 certification. It is believed that with continuous implementation of regulations, more improvement is foreseeable. Meanwhile, Taiwan and China should also continuously enhance their collaboration regarding the transboundary management of hazardous waste.

  9. Practical considerations for disaster preparedness and continuity management in research facilities.

    PubMed

    Mortell, Norman; Nicholls, Sam

    2013-10-01

    Many research facility managers, veterinarians and directors are familiar with the principles of Good Laboratory Practice, requirements of the Association for Assessment and Accreditation of Laboratory Animal Care International, tenets of biosecurity and standards of animal welfare and housing but may be less familiar with the ideas of business continuity. But business continuity considerations are as applicable to research facilities as they are to other institutions. The authors discuss how business continuity principles can be applied in the research context and propose that such application, or 'research continuity management,' enables a focused but wide-reaching approach to disaster preparedness.

  10. 49 CFR 614.101 - Cross-reference to management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... traffic monitoring for highways and public transportation facilities and equipment. ... 49 Transportation 7 2010-10-01 2010-10-01 false Cross-reference to management systems. 614.101 Section 614.101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT...

  11. Assessment of radiological protection systems among diagnostic radiology facilities in North East India.

    PubMed

    Singh, Thokchom Dewan; Jayaraman, T; Arunkumar Sharma, B

    2017-03-01

    This study aims to assess the adequacy level of radiological protection systems available in the diagnostic radiology facilities located in three capital cities of North East (NE) India. It further attempts to understand, using a multi-disciplinary approach, how the safety codes/standards in diagnostic radiology framed by the Atomic Energy Regulatory Board (AERB) and the International Atomic Energy Agency (IAEA) to achieve adequate radiological protection in facilities, have been perceived, conceptualized, and applied accordingly in these facilities. About 30 diagnostic radiology facilities were randomly selected from three capitals of states in NE India; namely Imphal (Manipur), Shillong (Meghalaya) and Guwahati (Assam). A semi-structured questionnaire developed based on a multi-disciplinary approach was used for this study. It was observed that radiological practices undertaken in these facilities were not exactly in line with safety codes/standards in diagnostic radiology of the AERB and the IAEA. About 50% of the facilities had registered/licensed x-ray equipment with the AERB. More than 80% of the workers did not use radiation protective devices, although these devices were available in the facilities. About 85% of facilities had no institutional risk management system. About 70% of the facilities did not carry out periodic quality assurance testing of their x-ray equipment or surveys of radiation leakage around the x-ray room, and did not display radiation safety indicators in the x-ray rooms. Workers in these facilities exhibited low risk perception about the risks associated with these practices. The majority of diagnostic radiology facilities in NE India did not comply with the radiological safety codes/standards framed by the AERB and IAEA. The study found inadequate levels of radiological protection systems in the majority of facilities. This study suggests a need to establish firm measures that comply with the radiological safety codes/standards of the

  12. Fuel Distribution Systems | Energy Systems Integration Facility | NREL

    Science.gov Websites

    Fuel Distribution Systems Fuel Distribution Systems The Energy Systems Integration Facility's integrated fuel distribution systems provide natural gas, hydrogen, and diesel throughout its laboratories in two laboratories: the Power Systems Integration Laboratory and the Energy Storage Laboratory. Each

  13. Diagnostic-management system and test pulse acquisition for WEST plasma measurement system

    NASA Astrophysics Data System (ADS)

    Wojenski, A.; Kasprowicz, G.; Pozniak, K. T.; Byszuk, A.; Juszczyk, B.; Zabolotny, W.; Zienkiewicz, P.; Chernyshova, M.; Czarski, T.; Mazon, D.; Malard, P.

    2014-11-01

    This paper describes current status of electronics, firmware and software development for new plasma measurement system for use in WEST facility. The system allows to perform two dimensional plasma visualization (in time) with spectrum measurement. The analog front-end is connected to Gas Electron Multiplier detector (GEM detector). The system architecture have high data throughput due to use of PCI-Express interface, Gigabit Transceivers and sampling frequency of ADC integrated circuits. The hardware is based on several years of experience in building X-ray spectrometer system for Joint European Torus (JET) facility. Data streaming is done using Artix7 FPGA devices. The system in basic configuration can work with up to 256 channels, while the maximum number of measurement channels is 2048. Advanced firmware for the FPGA is required in order to perform high speed data streaming and analog signal sampling. Diagnostic system management has been developed in order to configure measurement system, perform necessary calibration and prepare hardware for data acquisition.

  14. Stocking the Toolbox: Ideas for Successful Facility Management

    ERIC Educational Resources Information Center

    Gadzikowski, Ann

    2005-01-01

    From snow removal to dishwasher repair, from pest control to playground renovations, there are countless demands on a child care director's time and attention. A child care director is required to juggle a wide variety of roles and expectations related to facility management, often with very little training or expertise in this area. Some child…

  15. Integration of Biosafety into Core Facility Management

    PubMed Central

    Fontes, Benjamin

    2013-01-01

    This presentation will discuss the implementation of biosafety policies for small, medium and large core laboratories with primary shared objectives of ensuring the control of biohazards to protect core facility operators and assure conformity with applicable state and federal policies, standards and guidelines. Of paramount importance is the educational process to inform core laboratories of biosafety principles and policies and to illustrate the technology and process pathways of the core laboratory for biosafety professionals. Elevating awareness of biohazards and the biosafety regulatory landscape among core facility operators is essential for the establishment of a framework for both project and material risk assessment. The goal of the biohazard risk assessment process is to identify the biohazard risk management parameters to conduct the procedure safely and in compliance with applicable regulations. An evaluation of the containment, protective equipment and work practices for the procedure for the level of risk identified is facilitated by the establishment of a core facility registration form for work with biohazards and other biological materials with potential risk. The final step in the biocontainment process is the assumption of Principal Investigator role with full responsibility for the structure of the site-specific biosafety program plan by core facility leadership. The presentation will provide example biohazard protocol reviews and accompanying containment measures for core laboratories at Yale University.

  16. Flow analysis of metals in a municipal solid waste management system.

    PubMed

    Jung, C H; Matsuto, T; Tanaka, N

    2006-01-01

    This study aimed to identify the metal flow in a municipal solid waste (MSW) management system. Outputs of a resource recovery facility, refuse derived fuel (RDF) production facility, carbonization facility, plastics liquefaction facility, composting facility, and bio-gasification facility were analyzed for metal content and leaching concentration. In terms of metal content, bulky and incombustible waste had the highest values. Char from a carbonization facility, which treats household waste, had a higher metal content than MSW incinerator bottom ash. A leaching test revealed that Cd and Pb in char and Pb in RDF production residue exceeded the Japanese regulatory criteria for landfilling, so special attention should be paid to final disposal of these substances. By multiplying metal content and the generation rate of outputs, the metal content of input waste to each facility was estimated. For most metals except Cr, the total contribution ratio of paper/textile/plastics, bulky waste, and incombustible waste was over 80%. Approximately 30% of Cr originated from plastic packaging. Finally, several MSW management scenarios showed that most metals are transferred to landfills and the leaching potential of metals to the environment is quite small.

  17. Flow analysis of metals in a municipal solid waste management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jung, C.H.; Matsuto, T.; Tanaka, N.

    2006-07-01

    This study aimed to identify the metal flow in a municipal solid waste (MSW) management system. Outputs of a resource recovery facility, refuse derived fuel (RDF) production facility, carbonization facility, plastics liquefaction facility, composting facility, and bio-gasification facility were analyzed for metal content and leaching concentration. In terms of metal content, bulky and incombustible waste had the highest values. Char from a carbonization facility, which treats household waste, had a higher metal content than MSW incinerator bottom ash. A leaching test revealed that Cd and Pb in char and Pb in RDF production residue exceeded the Japanese regulatory criteria formore » landfilling, so special attention should be paid to final disposal of these substances. By multiplying metal content and the generation rate of outputs, the metal content of input waste to each facility was estimated. For most metals except Cr, the total contribution ratio of paper/textile/plastics, bulky waste, and incombustible waste was over 80%. Approximately 30% of Cr originated from plastic packaging. Finally, several MSW management scenarios showed that most metals are transferred to landfills and the leaching potential of metals to the environment is quite small.« less

  18. Fit for purpose quality management system for military forensic exploitation.

    PubMed

    Wilson, Lauren Elizabeth; Gahan, Michelle Elizabeth; Robertson, James; Lennard, Chris

    2018-03-01

    In a previous publication we described a systems approach to forensic science applied in the military domain. The forensic science 'system of systems' describes forensic science as a sub-system in the larger criminal justice, law enforcement, intelligence, and military systems, with quality management being an important supporting system. Quality management systems help to ensure that organisations achieve their objective and continually improve their capability. Components of forensic science quality management systems can include standardisation of processes, accreditation of facilities to national/international standards, and certification of personnel. A fit for purpose quality management system should be balanced to allow organisations to meet objectives, provide continuous improvement; mitigate risk; and impart a positive quality culture. Considerable attention over the last decades has been given to the need for forensic science quality management systems to meet criminal justice and law enforcement objectives. More recently, the need for the forensic quality management systems to meet forensic intelligence objectives has been considered. This paper, for the first time, discusses the need for a fit for purpose quality management system for military forensic exploitation. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  19. Dual-Use Aspects of System Health Management

    NASA Technical Reports Server (NTRS)

    Owens, P. R.; Jambor, B. J.; Eger, G. W.; Clark, W. A.

    1994-01-01

    System Health Management functionality is an essential part of any space launch system. Health management functionality is an integral part of mission reliability, since it is needed to verify the reliability before the mission starts. Health Management is also a key factor in life cycle cost reduction and in increasing system availability. The degree of coverage needed by the system and the degree of coverage made available at a reasonable cost are critical parameters of a successful design. These problems are not unique to the launch vehicle world. In particular, the Intelligent Vehicle Highway System, commercial aircraft systems, train systems, and many types of industrial production facilities require various degrees of system health management. In all of these applications, too, the designers must balance the benefits and costs of health management in order to optimize costs. The importance of an integrated system is emphasized. That is, we present the case for considering health management as an integral part of system design, rather than functionality to be added on at the end of the design process. The importance of maintaining the system viewpoint is discussed in making hardware and software tradeoffs and in arriving at design decisions. We describe an approach to determine the parameters to be monitored in any system health management application. This approach is based on Design of Experiments (DOE), prototyping, failure modes and effects analyses, cost modeling and discrete event simulation. The various computer-based tools that facilitate the approach are discussed. The approach described originally was used to develop a fault tolerant avionics architecture for launch vehicles that incorporated health management as an integral part of the system. Finally, we discuss generalizing the technique to apply it to other domains. Several illustrations are presented.

  20. New Systems of Food Service Management for the Air Force

    DTIC Science & Technology

    1979-09-01

    Without good management and successful innovations to meet customer needs, institutional food systems either survive precariously, or on a...unlimited access to all base facilities as well as the innovative , profit oriented management of the contractor. The results of this analysis and its...of innovative , profit-oriented management on the part of the contractor. The results of this analysis, along with its impact on the data presented in

  1. 41 CFR 102-72.45 - What are the different types of delegations related to facility management?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... different types of delegations related to facility management? The principal types of delegations involved... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the different types of delegations related to facility management? 102-72.45 Section 102-72.45 Public Contracts and...

  2. An expert system for municipal solid waste management simulation analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsieh, M.C.; Chang, N.B.

    1996-12-31

    Optimization techniques were usually used to model the complicated metropolitan solid waste management system to search for the best dynamic combination of waste recycling, facility siting, and system operation, where sophisticated and well-defined interrelationship are required in the modeling process. But this paper applied the Concurrent Object-Oriented Simulation (COOS), a new simulation software construction method, to bridge the gap between the physical system and its computer representation. The case study of Kaohsiung solid waste management system in Taiwan is prepared for the illustration of the analytical methodology of COOS and its implementation in the creation of an expert system.

  3. Use of decision support systems as a drought management tool

    USGS Publications Warehouse

    Frevert, D.; Lins, H.; ,

    2005-01-01

    Droughts present a unique challenge to water managers throughout the world and the current drought in the western United States is taxing facilities to the limit. Coping with this severe drought requires state of the art decision support systems including efficient and accurate hydrologic process models, detailed hydrologic data bases and effective river systems management modeling frameworks. This paper will outline a system of models developed by the Bureau of Reclamation, the US Geological Survey, the University of Colorado and a number of other governmental and university partners. The application of the technology to drought management in several key western river basins will be discussed.

  4. Managed care in four managed competition OECD health systems.

    PubMed

    Shmueli, Amir; Stam, Piet; Wasem, Jürgen; Trottmann, Maria

    2015-07-01

    Managed care emerged in the American health system in the 1980s as a way to manage suppliers' induced demand and to contain insurers' costs. While in Israel the health insurers have always been managed care organizations, owning health care facilities, employing medical personnel or contracting selectively with independent providers, European insurers have been much more passive, submitting themselves to collective agreements between insurers' and providers' associations, accompanied by extensive government regulation of prices, quantities, and budgets. With the 1990s reforms, and the introduction of risk-adjusted "managed competition", a growing pressure to allow the European insurers to manage their own care - including selective contracting with providers - has emerged, with varying speed of the introduction of policy changes across the individual countries. This paper compares experiences with managed care in Israel, The Netherlands, Germany and Switzerland since the 1990s. After a brief description of the health insurance markets in the four countries, we focus comparatively on the emergence of managed care in the markets for ambulatory care and inpatient market care. We conclude with an evaluation of the current situation and a discussion of selected health policy issues. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  5. Canadian Innovations in Siting Hazardous Waste Management Facilities

    PubMed

    Kuhn; Ballard

    1998-07-01

    / Siting hazardous waste facilities is an extremely complex and difficult endeavor. Public aversion to the construction of these facilities in or near their community often results in concerted opposition, referred to as the NIMBY syndrome. For the most part, siting processes do not fail because of inadequate environmental or technical considerations, but because of the adversarial decision-making strategies employed by the proponents. Innovative siting processes used in the provinces of Alberta and Manitoba offer tangible evidence of the successful application of an innovative siting approach based on the principles of decentralization of decision-making authority and full and meaningful public involvement. The purpose of this paper is to evaluate four Canadian siting processes from the perspective of public participation and access to decision-making authority. Examples of siting processes related to hazardous waste management facilities are provided from the provinces of Alberta, Manitoba, British Columbia, and Ontario. Siting has evolved from approaches dominated by top-down decision making to increasing decentralized and pluralistic approaches. Focusing on social and political concerns of potentially affected communities and on the process of decision making itself are fundamental to achieving siting success. In Alberta initially, and later in Manitoba, this new "open approach" to siting has resulted in the construction of the first two comprehensive hazardous waste treatment facilities in Canada.KEY WORDS: Hazardous waste facilities; Siting methodologies; Public participation

  6. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    NREL News Energy Systems Integration News A monthly recap of the latest happenings at the Energy Systems Integration Facility and developments in energy systems integration (ESI) research at NREL ; said Vahan Gevorgian, chief engineer with NREL's Power Systems Engineering Center. "Results of

  7. 41 CFR 102-74.585 - What Federal facility telework policy must Executive agencies follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What Federal facility... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Telework § 102-74.585 What Federal facility telework policy must Executive...

  8. Radiation safety requirements for radioactive waste management in the framework of a quality management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salgado, M.M.; Benitez, J.C.; Pernas, R.

    2007-07-01

    The Center for Radiation Protection and Hygiene (CPHR) is the institution responsible for the management of radioactive wastes generated from nuclear applications in medicine, industry and research in Cuba. Radioactive Waste Management Service is provided at a national level and it includes the collection and transportation of radioactive wastes to the Centralized Waste Management Facilities, where they are characterized, segregated, treated, conditioned and stored. A Quality Management System, according to the ISO 9001 Standard has been implemented for the RWM Service at CPHR. The Management System includes the radiation safety requirements established for RWM in national regulations and in themore » Licence's conditions. The role of the Regulatory Body and the Radiation Protection Officer in the Quality Management System, the authorization of practices, training and personal qualification, record keeping, inspections of the Regulatory Body and internal inspection of the Radiation Protection Officer, among other aspects, are described in this paper. The Quality Management System has shown to be an efficient tool to demonstrate that adequate measures are in place to ensure the safety in radioactive waste management activities and their continual improvement. (authors)« less

  9. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  10. Energy Systems Sensor Laboratory | Energy Systems Integration Facility |

    Science.gov Websites

    NREL Sensor Laboratory Energy Systems Sensor Laboratory The Energy Systems Integration Facility's Energy Systems Sensor Laboratory is designed to support research, development, testing, and evaluation of advanced hydrogen sensor technologies to support the needs of the emerging hydrogen

  11. Crises and Resilience at the Frontline—Public Health Facility Managers under Devolution in a Sub-County on the Kenyan Coast

    PubMed Central

    Nyikuri, Mary; Tsofa, Benjamin; Barasa, Edwine; Okoth, Philip; Molyneux, Sassy

    2015-01-01

    Background Public primary health care (PHC) facilities are for many individuals the first point of contact with the formal health care system. These facilities are managed by professional nurses or clinical officers who are recognised to play a key role in implementing health sector reforms and facilitating initiatives aimed at strengthening community involvement. Little in-depth research exists about the dimensions and challenges of these managers’ jobs, or on the impact of decentralisation on their roles and responsibilities. In this paper, we describe the roles and responsibilities of PHC managers–or ‘in-charges’ in Kenya, and their challenges and coping strategies, under accelerated devolution. Methods The data presented in this paper is part of a wider set of activities aimed at understanding governance changes under devolution in Kenya, under the umbrella of a ‘learning site’. A learning site is a long term process of collaboration between health managers and researchers deciding together on key health system questions and interventions. Data were collected through seven formal in depth interviews and observations at four PHC facilities as well as eight in depth interviews and informal interactions with sub-county managers from June 2013 to July 2014. Drawing on the Aragon framework of organisation capacity we discuss the multiple accountabilities, daily routines, challenges and coping strategies among PHC facility managers. Results PHC in-charges perform complex and diverse roles in a difficult environment with relatively little formal preparation. Their key concerns are lack of job clarity and preparedness, the difficulty of balancing multidirectional accountability responsibilities amidst significant resource shortages, and remuneration anxieties. We show that day-to-day management in an environment of resource constraints and uncertainty requires PHC in-charges who are resilient, reflective, and continuously able to learn and adapt. We

  12. Barriers to Optimal Pain Management in Aged Care Facilities: An Australian Qualitative Study.

    PubMed

    Veal, Felicity; Williams, Mackenzie; Bereznicki, Luke; Cummings, Elizabeth; Thompson, Angus; Peterson, Gregory; Winzenberg, Tania

    2018-04-01

    Up to 80% of residents in aged care facilities (ACFs) experience pain, which is often suboptimally managed. The purpose of this study was to characterize pain management in ACFs and identify the barriers to optimal pain management. This exploratory descriptive qualitative study used semistructured interviews in five Southern Tasmania, Australian ACFs. Interviewees included 23 staff members (18 nurses and 5 facility managers) and were conducted from September to November 2015. Interviews included questions about how pain was measured or assessed, what happened if pain was identified, barriers to pain management, and potential ways to overcome these barriers. Interviewees noted that there were no formal requirements regarding pain assessment at the ACFs reviewed; however, pain was often informally assessed. Staff noted the importance of adequate pain management for the residents' quality of life and employed both nonpharmacologic and pharmacologic techniques to reduce pain when identified. The barriers to optimal pain management included difficulty identifying and assessing pain, residents' resistance to reporting pain and/or taking medications, and communication barriers between the nursing staff and GPs. Staff interviewed were dedicated to managing residents' pain effectively; however, actions in a number of areas could improve resident outcomes. These include a more consistent approach to documenting pain in residents' progress notes and improving nurse-GP communications to ensure that new or escalating pain is identified and expedient changes can be made to the resident's management. Additionally, resident, family, nurse, and carer education, conducted within the facilities on a regular basis, could help improve the pain management of residents. Copyright © 2017. Published by Elsevier Inc.

  13. Initial Perceptions of Open Higher Education Students with Learner Management Systems

    ERIC Educational Resources Information Center

    Altunoglu, Asu

    2017-01-01

    Learner management systems (LMS) are used in open education as a means of managing and recording e-learning facilities as well as improving student engagement. Students benefit from them to become active participants in the decision-making process of their own learning. This study aims to investigate the initial perceptions of students…

  14. The development of an automated flight test management system for flight test planning and monitoring

    NASA Technical Reports Server (NTRS)

    Hewett, Marle D.; Tartt, David M.; Duke, Eugene L.; Antoniewicz, Robert F.; Brumbaugh, Randal W.

    1988-01-01

    The development of an automated flight test management system (ATMS) as a component of a rapid-prototyping flight research facility for AI-based flight systems concepts is described. The rapid-prototyping facility includes real-time high-fidelity simulators, numeric and symbolic processors, and high-performance research aircraft modified to accept commands for a ground-based remotely augmented vehicle facility. The flight system configuration of the ATMS includes three computers: the TI explorer LX and two GOULD SEL 32/27s.

  15. Radioactive Waste Management at the New Conversion Facility of 'TVEL'{sup R} Fuel Company - 13474

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Indyk, S.I.; Volodenko, A.V.; Tvilenev, K.A.

    2013-07-01

    The project on the new conversion facility construction is being implemented by Joint Stock Company (JSC) 'Siberian Group of Chemical Enterprises' (SGChE) within TVEL{sup R} Fuel Company. The objective is to construct the up-to-date facility ensuring the industrial and environmental safety with the reduced impact on the community and environment in compliance with the Russian new regulatory framework on radioactive waste (RW) management. The history of the SGChE development, as well as the concepts and approaches to RW management implemented by now are shown. The SGChE future image is outlined, together with its objectives and concept on RW management inmore » compliance with the new act 'On radioactive waste management' adopted in Russia in 2011. Possible areas of cooperation with international companies are discussed in the field of RW management with the purpose of deploying the best Russian and world practices on RW management at the new conversion facility. (authors)« less

  16. Job Management Requirements for NAS Parallel Systems and Clusters

    NASA Technical Reports Server (NTRS)

    Saphir, William; Tanner, Leigh Ann; Traversat, Bernard

    1995-01-01

    A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

  17. EPA Facility Registry Service (FRS): OIL

    EPA Pesticide Factsheets

    This dataset contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Oil database. The Oil database contains information on Spill Prevention, Control, and Countermeasure (SPCC) and Facility Response Plan (FRP) subject facilities to prevent and respond to oil spills. FRP facilities are referred to as substantial harm facilities due to the quantities of oil stored and facility characteristics. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to Oil facilities once the Oil data has been integrated into the FRS database. Additional information on FRS is available at the EPA website https://www.epa.gov/enviro/facility-registry-service-frs.

  18. 41 CFR 102-74.270 - Are vehicles required to display parking permits in parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vehicles required to... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.270 Are vehicles required...

  19. Case Management of Severe Malaria - A Forgotten Practice: Experiences from Health Facilities in Uganda

    PubMed Central

    Achan, Jane; Tibenderana, James; Kyabayinze, Daniel; Mawejje, Henry; Mugizi, Rukaaka; Mpeka, Betty; Talisuna, Ambrose; D'Alessandro, Umberto

    2011-01-01

    Introduction Severe malaria is a life-threatening medical emergency and requires prompt and effective treatment to prevent death. There is paucity of published information on current practices of severe malaria case management in sub-Saharan Africa; we evaluated the management practices for severe malaria in Ugandan health facilities Methods and Findings We did a cross sectional survey, using multi-stage sampling methods, of health facilities in 11 districts in the eastern and mid-western parts of Uganda. The study instruments were adapted from the WHO hospital care assessment tools. Between June and August 2009, 105 health facilities were surveyed and 181 health workers and 868 patients/caretakers interviewed. None of the inpatient facilities had all seven components of a basic care package for the management of severe malaria consistently available during the 3 months prior to the survey. Referral practices were appropriate for <10% (18/196) of the patients. Prompt care at any health facility was reported by 29% (247/868) of patients. Severe malaria was correctly diagnosed in 27% of patients (233).Though the quinine dose and regimen was correct in the majority (611/868, 70.4%) of patients, it was administered in the correct volumes of 5% dextrose in only 18% (147/815). Most patients (80.1%) had several doses of quinine administered in one single 500 ml bottle of 5% dextrose. Medications were purchased by 385 (44%) patients and medical supplies by 478 patients (70.6%). Conclusions Management of severe malaria in Ugandan health facilities was sub-optimal. These findings highlight the challenges of correctly managing severe malaria in resource limited settings. Priority areas for improvement include triage and emergency care, referral practises, quality of diagnosis and treatment, availability of medicines and supplies, training and support supervision. PMID:21390301

  20. Management Academy LANL Business Systems: Property Management, Course #31036

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shepherd, Michael J.; Rinke, Helen Mae; Hanson, Todd

    Los Alamos National Laboratory (LANL) is responsible for the efficient economical management of all government property in its stewardship. This training explains the role LANL managers have in managing, controlling, and disposing of government property. The Laboratory's goal is good asset management. By properly managing property across the facility, Laboratory managers can help ASM improve government property utilization and extend asset life, while reducing asset-related operating costs and expenditures.

  1. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1983-01-01

    The current work in progress for the SAGA project are described. The highlights of this research are: a parser independent SAGA editor, design for the screen editing facilities of the editor, delivery to NASA of release 1 of Olorin, the SAGA parser generator, personal workstation environment research, release 1 of the SAGA symbol table manager, delta generation in SAGA, requirements for a proof management system, documentation for and testing of the cyber pascal make prototype, a prototype cyber-based slicing facility, a June 1984 demonstration plan, SAGA utility programs, summary of UNIX software engineering support, and theorem prover review.

  2. Joint Assessment of Renewable Energy and Water Desalination Research Center (REWDC) Program Capabilities and Facilities In Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissani, M; Fischer, R; Kidd, S

    2006-04-03

    The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility,more » waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.« less

  3. Safe, Cost Effective Management of Inactive Facilities at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W. E.; Yannitell, D. M.; Freeman, D. W.

    The Savannah River Site is part of the U.S. Department of Energy complex. It was constructed during the early 1950s to produce basic materials (such as plutonium-239 and tritium) used in the production of nuclear weapons. The 310-square-mile site is located in South Carolina, about 12 miles south of Aiken, South Carolina, and about 15 miles southeast of Augusta, Georgia. Savannah River Site (SRS) has approximately 200 facilities identified as inactive. These facilities range in size and complexity from large nuclear reactors to small storage buildings. These facilities are located throughout the site including three reactor areas, the heavy watermore » plant area, the manufacturing area, and other research and support areas. Unlike DOE Closure Sites such as Hanford and Rocky Flats, SRS is a Project Completion Site with continuing missions. As facilities complete their defined mission, they are shutdown and transferred from operations to the facility disposition program. At the SRS, Facilities Decontamination and Decommissioning (FDD) personnel manage the disposition phase of a inactive facility's life cycle in a manner that minimizes life cycle cost without compromising (1) the health or safety of workers and the public or (2) the quality of the environment. The disposition phase begins upon completion of operations shutdown and extends through establishing the final end-state. FDD has developed innovative programs to manage their responsibilities within a constrained budget.« less

  4. Materials management information systems.

    PubMed

    1996-01-01

    The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The

  5. A safety management system for an offshore Azerbaijan Caspian Sea Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brasic, M.F.; Barber, S.W.; Hill, A.S.

    1996-11-01

    This presentation will describe the Safety Management System that Azerbaijan International Operating Company (AIOC) has structured to assure that Company activities are performed in a manner that protects the public, the environment, contractors and AIOC employees. The Azerbaijan International Oil Company is a consortium of oil companies that includes Socar, the state oil company of Azerbaijan, a number of major westem oil companies, and companies from Russia, Turkey and Saudi Arabia. The Consortium was formed to develop and produce a group of large oil fields in the Caspian Sea. The Management of AIOC, in starting a new operation in Azerbaijan,more » recognized the need for a formal HSE management system to ensure that their HSE objectives for AIOC activities were met. As a consortium of different partners working together in a unique operation, no individual partner company HSE Management system was appropriate. Accordingly AIOC has utilized the E & P Forum {open_quotes}Guidelines for the Development and Application of Health Safety and Environmental Management Systems{close_quotes} as the framework document for the development of the new AIOC system. Consistent with this guideline, AIOC has developed 19 specific HSE Management System Expectations for implementing its HSE policy and objectives. The objective is to establish and continue to maintain operational integrity in all AIOC activities and site operations. An important feature is the use of structured Safety Cases for the design engineering activity. The basis for the Safety Cases is API RP 75 and 14 J for offshore facilities and API RP 750 for onshore facilities both complimented by {open_quotes}Best International Oilfield Practice{close_quotes}. When viewed overall, this approach provides a fully integrated system of HSE management from design into operation.« less

  6. The development of an airborne information management system for flight test

    NASA Technical Reports Server (NTRS)

    Bever, Glenn A.

    1992-01-01

    An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.

  7. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  8. Managing the Facilities Portfolio: New Book Addresses Elimination of $60 Billion Problem.

    ERIC Educational Resources Information Center

    Rush, Sean; And Others

    1991-01-01

    This excerpt from "Managing the Facilities Portfolio: A Practical Approach to Institutional Renewal and Deferred Maintenance" offers higher education business officers a conceptual framework comprising four steps: (1) establish baseline; (2) estimate needs; (3) compare model alternatives; and (4) report to management. (DB)

  9. Quality of malaria case management in Malawi: results from a nationally representative health facility survey.

    PubMed

    Steinhardt, Laura C; Chinkhumba, Jobiba; Wolkon, Adam; Luka, Madalitso; Luhanga, Misheck; Sande, John; Oyugi, Jessica; Ali, Doreen; Mathanga, Don; Skarbinski, Jacek

    2014-01-01

    Malaria is endemic throughout Malawi, but little is known about quality of malaria case management at publicly-funded health facilities, which are the major source of care for febrile patients. In April-May 2011, we conducted a nationwide, geographically-stratified health facility survey to assess the quality of outpatient malaria diagnosis and treatment. We enrolled patients presenting for care and conducted exit interviews and re-examinations, including reference blood smears. Moreover, we assessed health worker readiness (e.g., training, supervision) and health facility capacity (e.g. availability of diagnostics and antimalarials) to provide malaria case management. All analyses accounted for clustering and unequal selection probabilities. We also used survey weights to produce estimates of national caseloads. At the 107 facilities surveyed, most of the 136 health workers interviewed (83%) had received training on malaria case management. However, only 24% of facilities had functional microscopy, 15% lacked a thermometer, and 19% did not have the first-line artemisinin-based combination therapy (ACT), artemether-lumefantrine, in stock. Of 2,019 participating patients, 34% had clinical malaria (measured fever or self-reported history of fever plus a positive reference blood smear). Only 67% (95% confidence interval (CI): 59%, 76%) of patients with malaria were correctly prescribed an ACT, primarily due to missed malaria diagnosis. Among patients without clinical malaria, 31% (95% CI: 24%, 39%) were prescribed an ACT. By our estimates, 1.5 million of the 4.4 million malaria patients seen in public facilities annually did not receive correct treatment, and 2.7 million patients without clinical malaria were inappropriately given an ACT. Malawi has a high burden of uncomplicated malaria but nearly one-third of all patients receive incorrect malaria treatment, including under- and over-treatment. To improve malaria case management, facilities must at minimum have

  10. The Integrated Waste Tracking System - A Flexible Waste Management Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Robert Stephen

    2001-02-01

    The US Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) has fully embraced a flexible, computer-based tool to help increase waste management efficiency and integrate multiple operational functions from waste generation through waste disposition while reducing cost. The Integrated Waste Tracking System (IWTS)provides comprehensive information management for containerized waste during generation,storage, treatment, transport, and disposal. The IWTS provides all information necessary for facilities to properly manage and demonstrate regulatory compliance. As a platformindependent, client-server and Web-based inventory and compliance system, the IWTS has proven to be a successful tracking, characterization, compliance, and reporting tool that meets themore » needs of both operations and management while providing a high level of management flexibility.« less

  11. Facilities Management in Higher Education: Doing More with Less.

    ERIC Educational Resources Information Center

    Casey, John M.

    This analysis looked at higher education facilities management that, despite exponential growth in responsibilities since the 1960s, has seen reduced resources for operations and maintenance. By extrapolating 1988 data from the National Center for Education Statistics, the review estimated that there are now 3.4 billion square feet of higher…

  12. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    -matter experts to develop cyber-physical systems security testing methodologies and resilience best the Energy Systems Integration Facility as part of NREL's work with SolarCity and the Hawaiian Electric Companies. Photo by Amy Glickson, NREL Welcome to Energy Systems Integration News, NREL's monthly

  13. NASA's Advanced Life Support Systems Human-Rated Test Facility

    NASA Technical Reports Server (NTRS)

    Henninger, D. L.; Tri, T. O.; Packham, N. J.

    1996-01-01

    Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.

  14. The F-18 systems research aircraft facility

    NASA Technical Reports Server (NTRS)

    Sitz, Joel R.

    1992-01-01

    To help ensure that new aerospace initiatives rapidly transition to competitive U.S. technologies, NASA Dryden Flight Research Facility has dedicated a systems research aircraft facility. The primary goal is to accelerate the transition of new aerospace technologies to commercial, military, and space vehicles. Key technologies include more-electric aircraft concepts, fly-by-light systems, flush airdata systems, and advanced computer architectures. Future aircraft that will benefit are the high-speed civil transport and the National AeroSpace Plane. This paper describes the systems research aircraft flight research vehicle and outlines near-term programs.

  15. Workflow Management Systems for Molecular Dynamics on Leadership Computers

    NASA Astrophysics Data System (ADS)

    Wells, Jack; Panitkin, Sergey; Oleynik, Danila; Jha, Shantenu

    Molecular Dynamics (MD) simulations play an important role in a range of disciplines from Material Science to Biophysical systems and account for a large fraction of cycles consumed on computing resources. Increasingly science problems require the successful execution of ''many'' MD simulations as opposed to a single MD simulation. There is a need to provide scalable and flexible approaches to the execution of the workload. We present preliminary results on the Titan computer at the Oak Ridge Leadership Computing Facility that demonstrate a general capability to manage workload execution agnostic of a specific MD simulation kernel or execution pattern, and in a manner that integrates disparate grid-based and supercomputing resources. Our results build upon our extensive experience of distributed workload management in the high-energy physics ATLAS project using PanDA (Production and Distributed Analysis System), coupled with recent conceptual advances in our understanding of workload management on heterogeneous resources. We will discuss how we will generalize these initial capabilities towards a more production level service on DOE leadership resources. This research is sponsored by US DOE/ASCR and used resources of the OLCF computing facility.

  16. The planned Alaska SAR Facility - An overview

    NASA Technical Reports Server (NTRS)

    Carsey, Frank; Weeks, Wilford

    1987-01-01

    The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.

  17. Ice-On-Coil Diurnal Ice Storage Cooling System for a Barracks/Office/ Dining Hall Facility at Yuma Proving Ground, AZ

    DTIC Science & Technology

    1990-09-01

    Kedl is associated with the Oak Ridge National Laboratory ( ORNL ). The technical editor was Gloria J. Wienke, Information Management Office, USACERL. COL...of a DIS cooling system for Building 506, a barracks/ office/dining facility. Oak Ridge National Laboratory ( ORNL ) designed the system in cooperation... ORNL with assistance from YPG and analyzed by USACERL. R.J. Kedl and C.W. Sohn, As.vsment of Energy Storage Technologies for Army Facilities, Technical

  18. Atmospheric Radiation Measurement (ARM) Climate Research Facility Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mather, James

    2016-04-01

    Mission and Vision Statements for the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) Climate Research Facility Mission The ARM Climate Research Facility, a DOE scientific user facility, provides the climate research community with strategically located in situ and remote-sensing observatories designed to improve the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their interactions and coupling with the Earth’s surface. Vision To provide a detailed and accurate description of the Earth atmosphere in diverse climate regimes to resolve the uncertainties in climate and Earth system models toward the development ofmore » sustainable solutions for the nation's energy and environmental challenges.« less

  19. The Association Between Residential Care Facility Manager's Educational Attainment and the Presence of Structural and Service Innovations.

    PubMed

    Davis, Jullet A

    For many service-oriented firms, knowledge is a key commodity, and the process by which knowledge is codified is critical for firm survival. The administrator or top manager acts as the repository and disseminator of organizational knowledge. The purpose of this project is to examine the association between the administrator's educational attainment and innovation in residential care facilities. The study hypothesized that administrator academic education and certification or licensure would be positively associated with facility innovation. Data for this project comes from the 2010 National Survey of Residential Care Facilities. There were 2277 facilities included in the sample (weighted 30 811). Innovation, the dependent variable, was operationalized using 5 dichotomized measures: clinical information systems, pharmaceutical information systems, electronic health records, providing adult day care, and providing respite care. The data were analyzed using logistic regression. Overall, the results reveal that college education or certification/licensure increased the likelihood of technology use. In addition, those with a high school diploma and certification/licensure were more likely to use technology than were individuals who had, at a minimum, some college. The services models were not significant. It may be that the resources necessary to implement information systems vary substantially from the resources necessary to provide services.

  20. Control and Information Systems for the National Ignition Facility

    DOE PAGES

    Brunton, Gordon; Casey, Allan; Christensen, Marvin; ...

    2017-03-23

    Orchestration of every National Ignition Facility (NIF) shot cycle is managed by the Integrated Computer Control System (ICCS), which uses a scalable software architecture running code on more than 1950 front-end processors, embedded controllers, and supervisory servers. The ICCS operates laser and industrial control hardware containing 66 000 control and monitor points to ensure that all of NIF’s laser beams arrive at the target within 30 ps of each other and are aligned to a pointing accuracy of less than 50 μm root-mean-square, while ensuring that a host of diagnostic instruments record data in a few billionths of a second.more » NIF’s automated control subsystems are built from a common object-oriented software framework that distributes the software across the computer network and achieves interoperation between different software languages and target architectures. A large suite of business and scientific software tools supports experimental planning, experimental setup, facility configuration, and post-shot analysis. Standard business services using open-source software, commercial workflow tools, and database and messaging technologies have been developed. An information technology infrastructure consisting of servers, network devices, and storage provides the foundation for these systems. Thus, this work is an overview of the control and information systems used to support a wide variety of experiments during the National Ignition Campaign.« less

  1. Control and Information Systems for the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brunton, Gordon; Casey, Allan; Christensen, Marvin

    Orchestration of every National Ignition Facility (NIF) shot cycle is managed by the Integrated Computer Control System (ICCS), which uses a scalable software architecture running code on more than 1950 front-end processors, embedded controllers, and supervisory servers. The ICCS operates laser and industrial control hardware containing 66 000 control and monitor points to ensure that all of NIF’s laser beams arrive at the target within 30 ps of each other and are aligned to a pointing accuracy of less than 50 μm root-mean-square, while ensuring that a host of diagnostic instruments record data in a few billionths of a second.more » NIF’s automated control subsystems are built from a common object-oriented software framework that distributes the software across the computer network and achieves interoperation between different software languages and target architectures. A large suite of business and scientific software tools supports experimental planning, experimental setup, facility configuration, and post-shot analysis. Standard business services using open-source software, commercial workflow tools, and database and messaging technologies have been developed. An information technology infrastructure consisting of servers, network devices, and storage provides the foundation for these systems. Thus, this work is an overview of the control and information systems used to support a wide variety of experiments during the National Ignition Campaign.« less

  2. The Proposal of Key Performance Indicators in Facility Management and Determination the Weights of Significance

    NASA Astrophysics Data System (ADS)

    Rimbalová, Jarmila; Vilčeková, Silvia

    2013-11-01

    The practice of facilities management is rapidly evolving with the increasing interest in the discourse of sustainable development. The industry and its market are forecasted to develop to include non-core functions, activities traditionally not associated with this profession, but which are increasingly being addressed by facilities managers. The scale of growth in the built environment and the consequential growth of the facility management sector is anticipated to be enormous. Key Performance Indicators (KPI) are measure that provides essential information about performance of facility services delivery. In selecting KPI, it is critical to limit them to those factors that are essential to the organization reaching its goals. It is also important to keep the number of KPI small just to keep everyone's attention focused on achieving the same KPIs. This paper deals with the determination of weights of KPI of FM in terms of the design and use of sustainable buildings.

  3. BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. BUILDING 67 IS SURMISED TO HAVE BEEN A RAILROAD STATION DAYS WHEN SITE WAS A RESORT - National Home for Disabled Volunteer Soldiers, Eastern Branch, 1 VA Center, Augusta, Kennebec County, ME

  4. 41 CFR 102-74.265 - Who must provide for the regulation and policing of parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who must provide for the... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.265 Who must provide for...

  5. The ERDA/LeRC photovoltaic systems test facility

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.

    1977-01-01

    A test facility was designed, and built to provide a place where photovoltaic systems may be assembled and electrically configured, to evaluate system performance and characteristics. The facility consists of a solar cell array of an initial 10-kW peak power rating, test hardware for several alternate methods of power conditioning, a variety of loads, an electrical energy storage system, and an instrumentation and data acquisition system.

  6. Analysis of LNG peakshaving-facility release-prevention systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pelto, P.J.; Baker, E.G.; Powers, T.B.

    1982-05-01

    The purpose of this study is to provide an analysis of release prevention systems for a reference LNG peakshaving facility. An overview assessment of the reference peakshaving facility, which preceeded this effort, identified 14 release scenarios which are typical of the potential hazards involved in the operation of LNG peakshaving facilities. These scenarios formed the basis for this more detailed study. Failure modes and effects analysis and fault tree analysis were used to estimate the expected frequency of each release scenario for the reference peakshaving facility. In addition, the effectiveness of release prevention, release detection, and release control systems weremore » evaluated.« less

  7. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  8. Lewis Research Center space station electric power system test facilities

    NASA Technical Reports Server (NTRS)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  9. Inputs to quality: supervision, management, and community involvement in health facilities in Egypt in 2004.

    PubMed

    Cherlin, Emily J; Allam, Adel A; Linnander, Erika L; Wong, Rex; El-Toukhy, Essam; Sipsma, Heather; Krumholz, Harlan M; Curry, Leslie A; Bradley, Elizabeth H

    2011-10-20

    As low- and middle-income countries experience economic development, ensuring quality of health care delivery is a central component of health reform. Nevertheless, health reforms in low- and middle-income countries have focused more on access to services rather than the quality of these services, and reporting on quality has been limited. In the present study, we sought to examine the prevalence and regional variation in key management practices in Egyptian health facilities within three domains: supervision of the facility from the Ministry of Health and Population (MOHP), managerial processes, and patient and community involvement in care. We conducted a cross-sectional analysis of data from 559 facilities surveyed with the Egyptian Service Provision Assessment (ESPA) survey in 2004, the most recent such survey in Egypt. We registered on the Measure Demographic and Health Survey (DHS) website http://legacy.measuredhs.com/login.cfm to gain access to the survey data. From the ESPA sampled 559 MOHP facilities, we excluded a total of 79 facilities because they did not offer facility-based 24-hour care or have at least one physician working in the facility, resulting in a final sample of 480 facilities. The final sample included 76 general service hospitals, 307 rural health units, and 97 maternal and child health and urban health units (MCH/urban units). We used standard frequency analyses to describe facility characteristics and tested the statistical significance of regional differences using chi-square statistics. Nearly all facilities reported having external supervision within the 6 months preceding the interview. In contrast, key facility-level managerial processes, such as having routine and documented management meetings and applying quality assurance approaches, were uncommon. Involvement of communities and patients was also reported in a minority of facilities. Hospitals and health units located in Urban Egypt compared with more rural parts of Egypt were

  10. Instrument Systems Analysis and Verification Facility (ISAVF) users guide

    NASA Technical Reports Server (NTRS)

    Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.

    1985-01-01

    The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.

  11. Data Element Dictionary: Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Martin, James S.

    This document is intended to serve as a guide for institutions in the development of data bases to support the implementation of planning and management systems. This publication serves to identify and describe those facilities-related data elements: (1) required to support current National Center for Higher Education Management Systems (NCHEMS)…

  12. Terrorism-related risk management for health care facilities.

    PubMed

    Reid, Daniel J; Reid, William H

    2005-01-01

    Clinicians should have a basic understanding of the physical and financial risk to mental health facilities related to external threat, such as (but not necessarily limited to) terrorism. Patient care and accessibility to mental health services rest not only on clinical skills, but on a place to practice them and an organized system supported by staff, physical facilities and funding. Clinicians who have some familiarity with the non-clinical requirements for care are in a position to support non-clinical staff in preventing care from being interrupted by external threats or events such as terrorist activity, and/or serving at the interface of facility operations and direct clinical care. Readers should note that this article is an introduction to the topic and cannot address all local, state, and national standards for hospital safety, or insurance providers' individual facility requirements.

  13. [Effectiveness of incorporating a quality management system].

    PubMed

    Seki, Akira; Hankins, Raleigh W; Miya, Tetsumasa

    2010-01-01

    In 2003, the ISO 15189 international standardization program on the quality and competence of the clinical reference laboratory was introduced. To date, 46 facilities have committed themselves to providing a higher level of medical service by incorporating a quality management system (QMS) and acquiring accreditation. QMS is defined as "setting up a policy and goals pertaining to quality, and adopting an appropriate system," and is a scheme that includes all managerial and technical factors that can affect test results. Regarding the Health Sciences Research Institute Group, 4 facilities have previously received the accreditation described above, but in the process of implementing the QMS, a number of problems have been identified. Here, we report on the effectiveness of adopting such a QMS based on the results of employee questionnaires, internal audits, customer complaint analyses, and external audits by the Japan Accreditation Board for Conformity Assessment (JAB), the official inspection body for accreditation.

  14. NASA Plum Brook's B-2 Test Facility: Thermal Vacuum and Propellant Test Facility

    NASA Technical Reports Server (NTRS)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility. The heat sink provided a uniform temperature environment of approximately 77 K. The modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface.

  15. Quality of Malaria Case Management in Malawi: Results from a Nationally Representative Health Facility Survey

    PubMed Central

    Steinhardt, Laura C.; Chinkhumba, Jobiba; Wolkon, Adam; Luka, Madalitso; Luhanga, Misheck; Sande, John; Oyugi, Jessica; Ali, Doreen; Mathanga, Don; Skarbinski, Jacek

    2014-01-01

    Background Malaria is endemic throughout Malawi, but little is known about quality of malaria case management at publicly-funded health facilities, which are the major source of care for febrile patients. Methods In April–May 2011, we conducted a nationwide, geographically-stratified health facility survey to assess the quality of outpatient malaria diagnosis and treatment. We enrolled patients presenting for care and conducted exit interviews and re-examinations, including reference blood smears. Moreover, we assessed health worker readiness (e.g., training, supervision) and health facility capacity (e.g. availability of diagnostics and antimalarials) to provide malaria case management. All analyses accounted for clustering and unequal selection probabilities. We also used survey weights to produce estimates of national caseloads. Results At the 107 facilities surveyed, most of the 136 health workers interviewed (83%) had received training on malaria case management. However, only 24% of facilities had functional microscopy, 15% lacked a thermometer, and 19% did not have the first-line artemisinin-based combination therapy (ACT), artemether-lumefantrine, in stock. Of 2,019 participating patients, 34% had clinical malaria (measured fever or self-reported history of fever plus a positive reference blood smear). Only 67% (95% confidence interval (CI): 59%, 76%) of patients with malaria were correctly prescribed an ACT, primarily due to missed malaria diagnosis. Among patients without clinical malaria, 31% (95% CI: 24%, 39%) were prescribed an ACT. By our estimates, 1.5 million of the 4.4 million malaria patients seen in public facilities annually did not receive correct treatment, and 2.7 million patients without clinical malaria were inappropriately given an ACT. Conclusions Malawi has a high burden of uncomplicated malaria but nearly one-third of all patients receive incorrect malaria treatment, including under- and over-treatment. To improve malaria case

  16. Core commands across airway facilities systems.

    DOT National Transportation Integrated Search

    2003-05-01

    This study takes a high-level approach to evaluate computer systems without regard to the specific method of : interaction. This document analyzes the commands that Airway Facilities (AF) use across different systems and : the meanings attributed to ...

  17. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure... a room or area by housing them separately in different chambers or aquaria. Separation of species is... testing facility shall have a number of animal rooms or other test system areas separate from those...

  18. 40 CFR 792.43 - Test system care facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as... accomplished within a room or area by housing them separately in different chambers or aquaria. Separation of... different tests. (b) A testing facility shall have a number of animal rooms or other test system areas...

  19. 40 CFR 792.43 - Test system care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as... accomplished within a room or area by housing them separately in different chambers or aquaria. Separation of... different tests. (b) A testing facility shall have a number of animal rooms or other test system areas...

  20. 40 CFR 792.43 - Test system care facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as... accomplished within a room or area by housing them separately in different chambers or aquaria. Separation of... different tests. (b) A testing facility shall have a number of animal rooms or other test system areas...

  1. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure... a room or area by housing them separately in different chambers or aquaria. Separation of species is... testing facility shall have a number of animal rooms or other test system areas separate from those...

  2. 41 CFR 101-4.410 - Comparable facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Comparable facilities. 101-4.410 Section 101-4.410 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  3. Reuse of assembly systems: a great ecological and economical potential for facility suppliers

    NASA Astrophysics Data System (ADS)

    Weule, Hartmut; Buchholz, Carsten

    2001-02-01

    In addition to the consumer goods, capital goods offer a great potential for ecological and economic optimization. In view of this fact the project WiMonDi (Re-Use of Assembly Systems as new Business Fields), started in September 1998, focuses a marketable Remanufacturing and Re-Use of modules and components of assembly systems by using technically and organizationally continuous concepts. The objective of the closed Facility-Management-System is to prolong the serviceable lifespan of assembly facilities through the organized dismantling, refurbishment and reconditioning of the assembly facilities as well as their components. Therefore, it is necessary to develop easible and methodical strategies to realize a workable Re-Use concept. Within the project the focus is based on the optimization of Re-Use-strategies - the direct Re-Use, the Re-Use including Refurbishment as well as Material Recycling. The decision for an optimal strategy depends on economical (e.g. residual value, cost/benefit of relevant processes, etc.), ecological (e.g. pollutant components /substances), etc.) and technical parameters (e.g. reliability, etc.). For the purpose to integrate the total cost-of-ownership of products or components, WiMonDi integrates the costs of the use of products as well as the Re-Use costs/benefits. To initiate the conception of new distribution and user models between the supplier and the user of assembly facilities the described approach is conducted in close cooperation between Industry and University.

  4. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... experiencing congestion, the NPS shall develop a separate CMS to cover those facilities. Approaches may include... congestion management strategies; (v) Determine methods to monitor and evaluate the performance of the multi... means the level at which transportation system performance is no longer acceptable due to traffic...

  5. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... experiencing congestion, the NPS shall develop a separate CMS to cover those facilities. Approaches may include... congestion management strategies; (v) Determine methods to monitor and evaluate the performance of the multi... means the level at which transportation system performance is no longer acceptable due to traffic...

  6. Peculiarities of organizing the construction of nuclear medicine facilities and the transportation of radionuclide

    NASA Astrophysics Data System (ADS)

    Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor

    2017-10-01

    The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.

  7. Supportive supervision for medicines management in government health facilities in Kiambu County, Kenya: a health workers' perspective.

    PubMed

    Agoro, Oscar Otieno; Osuga, Ben Onyango; Adoyo, Maureen

    2015-01-01

    Effective supportive supervision is widely recognized as essential for optimal management of medicines in government health facilities and also in contributing towards improved access and utilization of health services. This study sought to examine the extent supportive supervision for medicines management in government health facilities from a health worker perspective. A cross-sectional study was done targeting health workers managing medicines in government health facilities in Kiambu County. One hundred and thirty eight respondents took part in the study which explored the quality of supportive supervision from a health worker's perspective, and also examined the factors influencing their contentment with the level of supervision received. A statistical analysis was done using SPSS 21 and Excel 2013. Supervisory visits from all levels of health management were not regularly done, standard checklists were not routinely used, and action plans irregularly developed and followed up. Only 54 (38.6%) respondents were satisfied with the levels of supportive supervision that they received, with satisfaction significantly differing across the professional cadres, χ (2) (12, n = 138) = 29.762, p = .003; across the different tiers of health facilities, r s (138) = 0.341, p < .001; and with the education levels of the respondents, r s (138) = 0.381, p < .001. The study concluded that supportive supervision for medicines management that government health facilities received was still inadequate, and health workers were dissatisfied with the level of supervision that they received. The study recommends a review of the support supervision policy at the county level to address the unearthed inefficiencies and improve supervision for medicines management in government health facilities.

  8. MIMI: multimodality, multiresource, information integration environment for biomedical core facilities.

    PubMed

    Szymanski, Jacek; Wilson, David L; Zhang, Guo-Qiang

    2009-10-01

    The rapid expansion of biomedical research has brought substantial scientific and administrative data management challenges to modern core facilities. Scientifically, a core facility must be able to manage experimental workflow and the corresponding set of large and complex scientific data. It must also disseminate experimental data to relevant researchers in a secure and expedient manner that facilitates collaboration and provides support for data interpretation and analysis. Administratively, a core facility must be able to manage the scheduling of its equipment and to maintain a flexible and effective billing system to track material, resource, and personnel costs and charge for services to sustain its operation. It must also have the ability to regularly monitor the usage and performance of its equipment and to provide summary statistics on resources spent on different categories of research. To address these informatics challenges, we introduce a comprehensive system called MIMI (multimodality, multiresource, information integration environment) that integrates the administrative and scientific support of a core facility into a single web-based environment. We report the design, development, and deployment experience of a baseline MIMI system at an imaging core facility and discuss the general applicability of such a system in other types of core facilities. These initial results suggest that MIMI will be a unique, cost-effective approach to addressing the informatics infrastructure needs of core facilities and similar research laboratories.

  9. "It's very complicated": a qualitative study of medicines management in intermediate care facilities in Northern Ireland.

    PubMed

    Millar, Anna N; Hughes, Carmel M; Ryan, Cristín

    2015-06-02

    Intermediate care (IC) describes a range of services targeted at older people, aimed at preventing unnecessary hospitalisation, promoting faster recovery from illness and maximising independence. Older people are at increased risk of medication-related adverse events, but little is known about the provision of medicines management services in IC facilities. This study aimed to describe the current provision of medicines management services in IC facilities in Northern Ireland (NI) and to explore healthcare workers' (HCWs) and patients' views of, and attitudes towards these services and the IC concept. Semi-structured interviews were conducted, recorded, transcribed verbatim and analysed using a constant comparative approach with HCWs and patients from IC facilities in NI. Interviews were conducted with 25 HCWs and 18 patients from 12 IC facilities in NI. Three themes were identified: 'concept and reality', 'setting and supply' and 'responsibility and review'. A mismatch between the concept of IC and the reality was evident. The IC facility setting dictated prescribing responsibilities and the supply of medicines, presenting challenges for HCWs. A lack of a standardised approach to responsibility for the provision of medicines management services including clinical review was identified. Whilst pharmacists were not considered part of the multidisciplinary team, most HCWs recognised a need for their input. Medicines management was not a concern for the majority of IC patients. Medicines management services are not integral to IC and medicine-related challenges are frequently encountered. Integration of pharmacists into the multidisciplinary team could potentially improve medicines management in IC.

  10. Atmospheric Radiation Measurement's Data Management Facility captures metadata and uses visualization tools to assist in routine data management.

    NASA Astrophysics Data System (ADS)

    Keck, N. N.; Macduff, M.; Martin, T.

    2017-12-01

    The Atmospheric Radiation Measurement's (ARM) Data Management Facility (DMF) plays a critical support role in processing and curating data generated by the Department of Energy's ARM Program. Data are collected near real time from hundreds of observational instruments spread out all over the globe. Data are then ingested hourly to provide time series data in NetCDF (network Common Data Format) and includes standardized metadata. Based on automated processes and a variety of user reviews the data may need to be reprocessed. Final data sets are then stored and accessed by users through the ARM Archive. Over the course of 20 years, a suite of data visualization tools have been developed to facilitate the operational processes to manage and maintain the more than 18,000 real time events, that move 1.3 TB of data each day through the various stages of the DMF's data system. This poster will present the resources and methodology used to capture metadata and the tools that assist in routine data management and discoverability.

  11. Optically-based Sensor System for Critical Nuclear Facilities Post-Event Seismic Structural Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCallen, David; Petrone, Floriana; Buckle, Ian

    The U.S. Department of Energy (DOE) has ownership and operational responsibility for a large enterprise of nuclear facilities that provide essential functions to DOE missions ranging from national security to discovery science and energy research. These facilities support a number of DOE programs and offices including the National Nuclear Security Administration, Office of Science, and Office of Environmental Management. With many unique and “one of a kind” functions, these facilities represent a tremendous national investment, and assuring their safety and integrity is fundamental to the success of a breadth of DOE programs. Many DOE critical facilities are located in regionsmore » with significant natural phenomenon hazards including major earthquakes and DOE has been a leader in developing standards for the seismic analysis of nuclear facilities. Attaining and sustaining excellence in nuclear facility design and management must be a core competency of the DOE. An important part of nuclear facility management is the ability to monitor facilities and rapidly assess the response and integrity of the facilities after any major upset event. Experience in the western U.S. has shown that understanding facility integrity after a major earthquake is a significant challenge which, lacking key data, can require extensive effort and significant time. In the work described in the attached report, a transformational approach to earthquake monitoring of facilities is described and demonstrated. An entirely new type of optically-based sensor that can directly and accurately measure the earthquake-induced deformations of a critical facility has been developed and tested. This report summarizes large-scale shake table testing of the sensor concept on a representative steel frame building structure, and provides quantitative data on the accuracy of the sensor measurements.« less

  12. Alaska SAR Facility mass storage, current system

    NASA Technical Reports Server (NTRS)

    Cuddy, David; Chu, Eugene; Bicknell, Tom

    1993-01-01

    This paper examines the mass storage systems that are currently in place at the Alaska SAR Facility (SAF). The architecture of the facility will be presented including specifications of the mass storage media that are currently used and the performances that we have realized from the various media. The distribution formats and media are also discussed. Because the facility is expected to service future sensors, the new requirements and possible solutions to these requirements are also discussed.

  13. Ageing management program for the Spanish low and intermediate level waste disposal and spent fuel and high-level waste centralised storage facilities

    NASA Astrophysics Data System (ADS)

    Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.

    2011-04-01

    The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.

  14. The Post-Dam System. Volume 5. Harvard Project Manager (HPM).

    DTIC Science & Technology

    1992-10-01

    cQllected and analyzed to determine structural integrity and usability. From this analysis, a repair schedule is developed. This is currently a time...information on mission-critical facility damage is collected and analyzed to determine structural integrity and usability. From this analysis, a repair...to determine repair strategies with an expert system, keep track of materials and equipment with a relational database management system, and

  15. Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conroy, Kevin W.; Vandergaast, Gerald

    2012-07-01

    The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated intomore » the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)« less

  16. Availability of drugs and medical supplies for emergency obstetric care: experience of health facility managers in a rural District of Tanzania.

    PubMed

    Mkoka, Dickson Ally; Goicolea, Isabel; Kiwara, Angwara; Mwangu, Mughwira; Hurtig, Anna-Karin

    2014-03-19

    Provision of quality emergency obstetric care relies upon the presence of skilled health attendants working in an environment where drugs and medical supplies are available when needed and in adequate quantity and of assured quality. This study aimed to describe the experience of rural health facility managers in ensuring the timely availability of drugs and medical supplies for emergency obstetric care (EmOC). In-depth interviews were conducted with a total of 17 health facility managers: 14 from dispensaries and three from health centers. Two members of the Council Health Management Team and one member of the Council Health Service Board were also interviewed. A survey of health facilities was conducted to supplement the data. All the materials were analysed using a qualitative thematic analysis approach. Participants reported on the unreliability of obtaining drugs and medical supplies for EmOC; this was supported by the absence of essential items observed during the facility survey. The unreliability of obtaining drugs and medical supplies was reported to result in the provision of untimely and suboptimal EmOC services. An insufficient budget for drugs from central government, lack of accountability within the supply system and a bureaucratic process of accessing the locally mobilized drug fund were reported to contribute to the current situation. The unreliability of obtaining drugs and medical supplies compromises the timely provision of quality EmOC. Multiple approaches should be used to address challenges within the health system that prevent access to essential drugs and supplies for maternal health. There should be a special focus on improving the governance of the drug delivery system so that it promotes the accountability of key players, transparency in the handling of information and drug funds, and the participation of key stakeholders in decision making over the allocation of locally collected drug funds.

  17. Availability of drugs and medical supplies for emergency obstetric care: experience of health facility managers in a rural District of Tanzania

    PubMed Central

    2014-01-01

    Background Provision of quality emergency obstetric care relies upon the presence of skilled health attendants working in an environment where drugs and medical supplies are available when needed and in adequate quantity and of assured quality. This study aimed to describe the experience of rural health facility managers in ensuring the timely availability of drugs and medical supplies for emergency obstetric care (EmOC). Methods In-depth interviews were conducted with a total of 17 health facility managers: 14 from dispensaries and three from health centers. Two members of the Council Health Management Team and one member of the Council Health Service Board were also interviewed. A survey of health facilities was conducted to supplement the data. All the materials were analysed using a qualitative thematic analysis approach. Results Participants reported on the unreliability of obtaining drugs and medical supplies for EmOC; this was supported by the absence of essential items observed during the facility survey. The unreliability of obtaining drugs and medical supplies was reported to result in the provision of untimely and suboptimal EmOC services. An insufficient budget for drugs from central government, lack of accountability within the supply system and a bureaucratic process of accessing the locally mobilized drug fund were reported to contribute to the current situation. Conclusion The unreliability of obtaining drugs and medical supplies compromises the timely provision of quality EmOC. Multiple approaches should be used to address challenges within the health system that prevent access to essential drugs and supplies for maternal health. There should be a special focus on improving the governance of the drug delivery system so that it promotes the accountability of key players, transparency in the handling of information and drug funds, and the participation of key stakeholders in decision making over the allocation of locally collected drug funds. PMID

  18. Profile of medical waste management in two healthcare facilities in Lagos, Nigeria: a case study.

    PubMed

    Idowu, Ibijoke; Alo, Babajide; Atherton, William; Al Khaddar, Rafid

    2013-05-01

    Proper management and safe disposal of medical waste (MW) is vital in the reduction of infection or illness through contact with discarded material and in the prevention of environmental contamination in hospital facilities. The management practices for MW in selected healthcare facilities in Lagos, Nigeria were assessed. The cross-sectional study involved the use of questionnaires, in-depth interviews, focused group discussions and participant observation strategies. It also involved the collection, segregation, identification and weighing of waste types from wards and units in the representative facilities in Lagos, Nigeria, for qualitative and quantitative analysis of the MW streams. The findings indicated that the selected Nigerian healthcare facilities were lacking in the adoption of sound MW management (MWM) practices. The average MW ranged from 0.01 kg/bed/day to 3.98 kg/bed/day. Moreover, about 30% of the domestic waste from the healthcare facilities consisted of MW due to inappropriate co-disposal practices. Multiple linear regression was applied to predict the volume of waste generated giving a correlation coefficient (R(2)) value of 0.99 confirming a good fit of the data. This study revealed that the current MWM practices and strategies in Lagos are weak, and suggests an urgent need for review to achieve vital reversals in the current trends.

  19. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix D: Life sciences research facility requirements

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    The purpose of this requirements document is to develop the foundation for concept development for the Life Sciences Research Facility (LSRF) on the Space Station. These requirements are developed from the perspective of a Space Station laboratory module outfitter. Science and mission requirements including those related to specimens are set forth. System requirements, including those for support, are detailed. Functional and design requirements are covered in the areas of structures, mechanisms, electrical power, thermal systems, data management system, life support, and habitability. Finally, interface requirements for the Command Module and Logistics Module are described.

  20. Use of information technology for medication management in residential care facilities: correlates of facility characteristics.

    PubMed

    Bhuyan, Soumitra S; Chandak, Aastha; Powell, M Paige; Kim, Jungyoon; Shiyanbola, Olayinka; Zhu, He; Shiyanbola, Oyewale

    2015-06-01

    The effectiveness of information technology in resolving medication problems has been well documented. Long-term care settings such as residential care facilities (RCFs) may see the benefits of using such technologies in addressing the problem of medication errors among their resident population, who are usually older and have numerous chronic conditions. The aim of this study was two-fold: to examine the extent of use of Electronic Medication Management (EMM) in RCFs and to analyze the organizational factors associated with the use of EMM functionalities in RCFs. Data on RCFs were obtained from the 2010 National Survey of Residential Care Facilities. The association between facility, director and staff, and resident characteristics of RCFs and adoption of four EMM functionalities was assessed through multivariate logistic regression. The four EMM functionalities included were maintaining lists of medications, ordering for prescriptions, maintaining active medication allergy lists, and warning of drug interactions or contraindications. About 12% of the RCFs adopted all four EMM functionalities. Additionally, maintaining lists of medications had the highest adoption rate (34.5%), followed by maintaining active medication allergy lists (31.6%), ordering for prescriptions (19.7%), and warning of drug interactions or contraindications (17.9%). Facility size and ownership status were significantly associated with adoption of all four EMM functionalities. Medicaid certification status, facility director's age, education and license status, and the use of personal care aides in the RCF were significantly associated with the adoption of some of the EMM functionalities. EMM is expected to improve the quality of care and patient safety in long-term care facilities including RCFs. The extent of adoption of the four EMM functionalities is relatively low in RCFs. Some RCFs may strategize to use these functionalities to cater to the increasing demands from the market and also to

  1. A new approach to the design of information systems for foodservice management in health care facilities.

    PubMed

    Matthews, M E; Norback, J P

    1984-06-01

    An organizational framework for integrating foodservice data into an information system for management decision making is presented. The framework involves the application to foodservice of principles developed by the disciplines of managerial economics and accounting, mathematics, computer science, and information systems. The first step is to conceptualize a foodservice system from an input-output perspective, in which inputs are units of resources available to managers and outputs are servings of menu items. Next, methods of full cost accounting, from the management accounting literature, are suggested as a mechanism for developing and assigning costs of using resources within a foodservice operation. Then matrix multiplication is used to illustrate types of information that matrix data structures could make available for management planning and control when combined with a conversational mode of computer programming.

  2. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  3. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  4. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  5. 41 CFR 102-74.55 - Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74...

  6. Client Functional Assessment Data as Management Information: Woodrow Wilson Rehabilitation Center's Management Information System

    PubMed Central

    Steidle, Ernest F.

    1983-01-01

    This paper describes the design of a functional assessment system, a component of a management information system (MIS) that supports a comprehensive rehabilitation facility. Products of the subsystem document the functional status of rehabilitation clients through process evaluation reporting and outcomes reporting. The purpose of this paper is to describe the design of this MIS component. The environment supported, the integration requirements and the needed development approach is unique, requiring significant input from health care professionals, medical informatics specialists, statisticians and program evaluators. Strategies for the implementation of the functional assessment system are the major results reported in this paper. They are most useful to the systems designer or management engineer in a human service delivery setting. MIS plan development, computer file structure and access methods, and approaches to scheduling applications is described. Finally, the development of functional status measures is discussed. Application of the methodologies described will facilitate similar efforts towards systems development in other human service delivery settings.

  7. Development of a Simplified Sustainable Facilities Guide

    DTIC Science & Technology

    2003-04-18

    Government Through Efficient Energy Management , June 3, 1999 EO 13148 Greening the Government Through Leadership in Environmental Management ...architects, engineers, and project managers . - The United States Green Building Council (USGBC) has created the " Leadership in Energy and...SIMPLIFIED SUSTAINABLE FACILITIES GUIDE THESIS Presented to the Faculty Department of Systems and Engineering Management

  8. Clostridium difficile in the Long-Term Care Facility: Prevention and Management

    PubMed Central

    Jump, Robin L. P.; Donskey, Curtis J.

    2014-01-01

    Residents of long-term care facilities are at high risk for Clostridium difficile infection due to frequent antibiotic exposure in a population already rendered vulnerable to infection due to advanced age, multiple comorbid conditions and communal living conditions. Moreover, asymptomatic carriage of toxigenic C. difficile and recurrent infections are prevalent in this population. Here, we discuss epidemiology and management of C. difficile infection among residents of long-term care facilities. Also, recognizing that both the population and culture differs significantly from that of hospitals, we also address prevention strategies specific to LTCFs. PMID:25685657

  9. Capacity planning for electronic waste management facilities under uncertainty: multi-objective multi-time-step model development.

    PubMed

    Poonam Khanijo Ahluwalia; Nema, Arvind K

    2011-07-01

    Selection of optimum locations for locating new facilities and decision regarding capacities at the proposed facilities is a major concern for municipal authorities/managers. The decision as to whether a single facility is preferred over multiple facilities of smaller capacities would vary with varying priorities to cost and associated risks such as environmental or health risk or risk perceived by the society. Currently management of waste streams such as that of computer waste is being done using rudimentary practices and is flourishing as an unorganized sector, mainly as backyard workshops in many cities of developing nations such as India. Uncertainty in the quantification of computer waste generation is another major concern due to the informal setup of present computer waste management scenario. Hence, there is a need to simultaneously address uncertainty in waste generation quantities while analyzing the tradeoffs between cost and associated risks. The present study aimed to address the above-mentioned issues in a multi-time-step, multi-objective decision-support model, which can address multiple objectives of cost, environmental risk, socially perceived risk and health risk, while selecting the optimum configuration of existing and proposed facilities (location and capacities).

  10. Management support and perceived consumer satisfaction in skilled nursing facilities.

    PubMed

    Metlen, Scott; Eveleth, Daniel; Bailey, Jeffrey J

    2005-08-01

    How managers 'manage' employees influences important firm outcomes. Heskett, Sasser, and Schlesinger contend that the level of internal support for service workers will influence consumer satisfaction. This study empirically explores how skilled nursing facility (SNF) managers affect consumer satisfaction by encouraging employee effectiveness and listening to employees to determine how to improve employee effectiveness. We extend previous research by proposing management as a form of internal support and demonstrating its relationship to service process integration, as a distinct form of internal support. The results of our individual-level investigation of 630 nursing assistants from 45 SNFs provide support for our two-part hypothesis. First, active management support and process integration, as elements of internal support, do lead to increased employee satisfaction and employee effectiveness. Second, the increased employee satisfaction and effectiveness was positively related to consumer satisfaction, as evaluated by the service workers. Thus, there is a positive influence of management's internal support of nursing assistants on perceived consumer satisfaction.

  11. EPA’s Experimental Stream Facility: Design and Research Supporting Watershed Management

    EPA Science Inventory

    The EPA’s Experimental Stream Facility (ESF) represents an important tool in research that is underway to further understanding of the relative importance of stream ecosystems and the services they provide for effective watershed management. The ESF is operated under the goal of ...

  12. Maximizing internal opportunities for healthcare facilities facing a managed-care environment.

    PubMed

    Gillespie, M

    1997-01-01

    The primary theme of this article concerns the pressures on healthcare facilities to become efficient utilizers of their existing resources. This acute need for efficiency has been extremely obvious since the changing reimbursement patterns of managed care have proliferated across the nation.

  13. Waste Management Facilities Cost Information report for Greater-Than-Class C and DOE equivalent special case waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feizollahi, F.; Shropshire, D.

    This Waste Management Facility Cost Information (WMFCI) report for Greater-Than-Class C low-level waste (GTCC LLW) and DOE equivalent special case waste contains preconceptual designs and planning level life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities needed for management of GTCC LLW and DOE equivalent waste. The report contains information on 16 facilities (referred to as cost modules). These facilities are treatment facility front-end and back-end support functions (administration support, and receiving, preparation, and shipping cost modules); seven treatment concepts (incineration, metal melting, shredding/compaction, solidification, vitrification, metal sizing and decontamination, and wet/air oxidation cost modules); two storage concepts (enclosedmore » vault and silo); disposal facility front-end functions (disposal receiving and inspection cost module); and four disposal concepts (shallow-land, engineered shallow-land, intermediate depth, and deep geological cost modules). Data in this report allow the user to develop PLCC estimates for various waste management options. A procedure to guide the U.S. Department of Energy (DOE) and its contractor personnel in the use of estimating data is also included in this report.« less

  14. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developedmore » system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used

  15. Use of a Balanced Scorecard in strengthening health systems in developing countries: an analysis based on nationally representative Bangladesh Health Facility Survey.

    PubMed

    Khan, M Mahmud; Hotchkiss, David R; Dmytraczenko, Tania; Zunaid Ahsan, Karar

    2013-01-01

    This paper illustrates the importance of collecting facility-based data through regular surveys to supplement the administrative data, especially for developing countries of the world. In Bangladesh, measures based on facility survey indicate that only 70% of very basic medical instruments and 35% of essential drugs were available in health facilities. Less than 2% of officially designated obstetric care facilities actually had required drugs, injections and personnel on-site. Majority of (80%) referral hospitals at the district level were not ready to provide comprehensive emergency obstetric care. Even though the Management Information System reports availability of diagnostic machines in all district-level and sub-district-level facilities, it fails to indicate that 50% of these machines are not functional. In terms of human resources, both physicians and nurses are in short supply at all levels of the healthcare system. The physician-nurse ratio also remains lower than the desirable level of 3.0. Overall job satisfaction index was less than 50 for physicians and 66 for nurses. Patient satisfaction score, however, was high (86) despite the fact that process indicators of service quality were poor. Facility surveys can help strengthen not only the management decision-making process but also the quality of administrative data. Copyright © 2012 John Wiley & Sons, Ltd.

  16. Cold Vacuum Drying facility civil structural system design description (SYS 06)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PITKOFF, C.C.

    This document describes the Cold Vacuum Drying (CVD) Facility civil - structural system. This system consists of the facility structure, including the administrative and process areas. The system's primary purpose is to provide for a facility to house the CVD process and personnel and to provide a tertiary level of containment. The document provides a description of the facility and demonstrates how the design meets the various requirements imposed by the safety analysis report and the design requirements document.

  17. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...

  18. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  19. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  20. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  1. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  2. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  3. An assessment of the current municipal solid waste management system in Lahore, Pakistan.

    PubMed

    Masood, Maryam; Barlow, Claire Y; Wilson, David C

    2014-09-01

    The current status of solid waste management in Lahore, a metropolitan city of Pakistan, is reviewed in this article using an existing approach, the UN-Habitat city profile. This involves a systematic quantitative and qualitative assessment of physical components and governance features of the current waste management system. A material flow diagram (MFD) is developed, which allows visualisation of the current waste management system with all related inputs and outputs. This study shows that in the current system, waste collection and transportation is the main focus, however the collection coverage is only about 68%. There is no controlled or even semi-controlled waste disposal facility in Lahore. There is no official recycling system in the city. It is estimated that currently ~27% of waste by weight is being recycled through the informal sector. Making use of the organic content of the waste, a composting facility is operative in the city, producing 47,230 tonnes year(-1) of organic compost. Lahore does not perform very well in governance features. Inclusivity of users and providers of the waste management system is low in the city, as not all stakeholders are consulted in the decision making processes. Waste management costs US$20 per tonne of waste, where the main focus is only on waste collection, and the current user fees are much lower than the actual costs. This study recommends that recycling should be promoted by increasing public awareness and integrating the informal sector to make the current system sustainable and financially viable. © The Author(s) 2014.

  4. When More is Less: The Case of Disconnected Information Systems in Indonesian Public Health Facilities

    NASA Astrophysics Data System (ADS)

    Wahid, Fathul; Teduh Dirgahayu, Raden; Hamzah, Almed; Setiaji, Hari

    2018-03-01

    The clear majority of previous studies have found that the absence of information systems to properly manage data is one of the main challenges in improving public health management. The present study offers an alternate perspective, revealing other emerging problems in cases where there are many information systems in place but without sufficient orchestration. The national government of Indonesia has been coercive in its implementation of various information systems without involving users at public health facilities, which has created many problems on the ground. The problems identified relate to the quality of the disconnected information systems currently in use, the lack of human resource development, unclear procedures, uncoordinated reports and the absence of an incentive scheme. The present study also highlights some practical implications, including the use of a more holistic perspective in designing and developing an integrated public health information infrastructure.

  5. A randomized trial of heart failure disease management in skilled nursing facilities (SNF Connect): Lessons learned.

    PubMed

    Daddato, Andrea; Wald, Heidi L; Horney, Carolyn; Fairclough, Diane L; Leister, Erin C; Coors, Marilyn; Capell, Warren H; Boxer, Rebecca S

    2017-06-01

    Conducting clinical trials in skilled nursing facilities is particularly challenging. This manuscript describes facility and patient recruitment challenges and solutions for clinical research in skilled nursing facilities. Lessons learned from the SNF Connect Trial, a randomized trial of a heart failure disease management versus usual care for patients with heart failure receiving post-acute care in skilled nursing facilities, are discussed. Description of the trial design and barriers to facility and patient recruitment along with regulatory issues are presented. The recruitment of Denver-metro skilled nursing facilities was facilitated by key stakeholders of the skilled nursing facilities community. However, there were still a number of barriers to facility recruitment including leadership turnover, varying policies regarding research, fear of litigation and of an increased workload. Engagement of facilities was facilitated by their strong interest in reducing hospital readmissions, marketing potential to hospitals, and heart failure management education for their staff. Recruitment of patients proved difficult and there were few facilitators. Identified patient recruitment challenges included patients being unaware of their heart failure diagnosis, patients overwhelmed with their illness and care, and frequently there was no available proxy for cognitively impaired patients. Flexibility in changing the recruitment approach and targeting skilled nursing facilities with higher rates of admissions helped to overcome some barriers. Recruitment of skilled nursing facilities and patients in skilled nursing facilities for clinical trials is challenging. Strategies to attract both facilities and patients are warranted. These include aligning study goals with facility incentives and flexible recruitment protocols to work with patients in "transition crisis."

  6. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  7. 41 CFR 101-39.102-1 - Records, facilities, personnel, and appropriations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.102-1 Records, facilities, personnel, and appropriations. (a) If GSA decides to establish a fleet management system, GSA, with the assistance of the...

  8. MASTR-MS: a web-based collaborative laboratory information management system (LIMS) for metabolomics.

    PubMed

    Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew

    2017-01-01

    An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research

  9. Next Generation Workload Management System For Big Data on Heterogeneous Distributed Computing

    NASA Astrophysics Data System (ADS)

    Klimentov, A.; Buncic, P.; De, K.; Jha, S.; Maeno, T.; Mount, R.; Nilsson, P.; Oleynik, D.; Panitkin, S.; Petrosyan, A.; Porter, R. J.; Read, K. F.; Vaniachine, A.; Wells, J. C.; Wenaus, T.

    2015-05-01

    The Large Hadron Collider (LHC), operating at the international CERN Laboratory in Geneva, Switzerland, is leading Big Data driven scientific explorations. Experiments at the LHC explore the fundamental nature of matter and the basic forces that shape our universe, and were recently credited for the discovery of a Higgs boson. ATLAS and ALICE are the largest collaborations ever assembled in the sciences and are at the forefront of research at the LHC. To address an unprecedented multi-petabyte data processing challenge, both experiments rely on a heterogeneous distributed computational infrastructure. The ATLAS experiment uses PanDA (Production and Data Analysis) Workload Management System (WMS) for managing the workflow for all data processing on hundreds of data centers. Through PanDA, ATLAS physicists see a single computing facility that enables rapid scientific breakthroughs for the experiment, even though the data centers are physically scattered all over the world. The scale is demonstrated by the following numbers: PanDA manages O(102) sites, O(105) cores, O(108) jobs per year, O(103) users, and ATLAS data volume is O(1017) bytes. In 2013 we started an ambitious program to expand PanDA to all available computing resources, including opportunistic use of commercial and academic clouds and Leadership Computing Facilities (LCF). The project titled ‘Next Generation Workload Management and Analysis System for Big Data’ (BigPanDA) is funded by DOE ASCR and HEP. Extending PanDA to clouds and LCF presents new challenges in managing heterogeneity and supporting workflow. The BigPanDA project is underway to setup and tailor PanDA at the Oak Ridge Leadership Computing Facility (OLCF) and at the National Research Center "Kurchatov Institute" together with ALICE distributed computing and ORNL computing professionals. Our approach to integration of HPC platforms at the OLCF and elsewhere is to reuse, as much as possible, existing components of the PanDA system. We

  10. Space Station Furnace Facility Management Information System (SSFF-MIS) Development

    NASA Technical Reports Server (NTRS)

    Meade, Robert M.

    1996-01-01

    This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of

  11. Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sueiae, S.; Fabjan, M.; Hrastar, U.

    2008-07-01

    The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment ofmore » institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a

  12. Service readiness, health facility management practices, and delivery care utilization in five states of Nigeria: a cross-sectional analysis.

    PubMed

    Gage, Anastasia J; Ilombu, Onyebuchi; Akinyemi, Akanni Ibukun

    2016-10-06

    Existing studies of delivery care in Nigeria have identified socioeconomic and cultural factors as the primary determinants of health facility delivery. However, no study has investigated the association between supply-side factors and health facility delivery. Our study analyzed the role of supply-side factors, particularly health facility readiness and management practices for provision of quality maternal health services. Using linked data from the 2005 and 2009 health facility and household surveys in the five states in which the Community Participation for Action in the Social Sector (COMPASS) project was implemented, indices of health service readiness and management were developed based on World Health Organization guidelines. Multilevel logistic regression models were run to determine the association between these indices and health facility delivery among 2710 women aged 15-49 years whose last child was born within the five years preceding the surveys and who lived in 51 COMPASS LGAs. The health facility delivery rate increased from 25.4 % in 2005 to 44.1 % in 2009. Basic amenities for antenatal care provision, readiness to deliver basic emergency obstetric and newborn care, and management practices supportive of quality maternal health services were suboptimal in health facilities surveyed and did not change significantly between 2005 and 2009. The LGA mean index of basic amenities for antenatal care provision was more positively associated with the odds of health facility delivery in 2009 than in 2005, and in rural than in urban areas. The LGA mean index of management practices was associated with significantly lower odds of health facility delivery in rural than in urban areas. The LGA mean index of facility readiness to deliver basic emergency obstetric and neonatal care declined slightly from 5.16 in 2005 to 3.98 in 2009 and was unrelated to the odds of health facility delivery. Supply-side factors appeared to play a role in health facility delivery

  13. Access Control Management for SCADA Systems

    NASA Astrophysics Data System (ADS)

    Hong, Seng-Phil; Ahn, Gail-Joon; Xu, Wenjuan

    The information technology revolution has transformed all aspects of our society including critical infrastructures and led a significant shift from their old and disparate business models based on proprietary and legacy environments to more open and consolidated ones. Supervisory Control and Data Acquisition (SCADA) systems have been widely used not only for industrial processes but also for some experimental facilities. Due to the nature of open environments, managing SCADA systems should meet various security requirements since system administrators need to deal with a large number of entities and functions involved in critical infrastructures. In this paper, we identify necessary access control requirements in SCADA systems and articulate access control policies for the simulated SCADA systems. We also attempt to analyze and realize those requirements and policies in the context of role-based access control that is suitable for simplifying administrative tasks in large scale enterprises.

  14. Event-based knowledge elicitation of operating room management decision-making using scenarios adapted from information systems data

    PubMed Central

    2011-01-01

    Background No systematic process has previously been described for a needs assessment that identifies the operating room (OR) management decisions made by the anesthesiologists and nurse managers at a facility that do not maximize the efficiency of use of OR time. We evaluated whether event-based knowledge elicitation can be used practically for rapid assessment of OR management decision-making at facilities, whether scenarios can be adapted automatically from information systems data, and the usefulness of the approach. Methods A process of event-based knowledge elicitation was developed to assess OR management decision-making that may reduce the efficiency of use of OR time. Hypothetical scenarios addressing every OR management decision influencing OR efficiency were created from published examples. Scenarios are adapted, so that cues about conditions are accurate and appropriate for each facility (e.g., if OR 1 is used as an example in a scenario, the listed procedure is a type of procedure performed at the facility in OR 1). Adaptation is performed automatically using the facility's OR information system or anesthesia information management system (AIMS) data for most scenarios (43 of 45). Performing the needs assessment takes approximately 1 hour of local managers' time while they decide if their decisions are consistent with the described scenarios. A table of contents of the indexed scenarios is created automatically, providing a simple version of problem solving using case-based reasoning. For example, a new OR manager wanting to know the best way to decide whether to move a case can look in the chapter on "Moving Cases on the Day of Surgery" to find a scenario that describes the situation being encountered. Results Scenarios have been adapted and used at 22 hospitals. Few changes in decisions were needed to increase the efficiency of use of OR time. The few changes were heterogeneous among hospitals, showing the usefulness of individualized assessments

  15. Event-based knowledge elicitation of operating room management decision-making using scenarios adapted from information systems data.

    PubMed

    Dexter, Franklin; Wachtel, Ruth E; Epstein, Richard H

    2011-01-07

    No systematic process has previously been described for a needs assessment that identifies the operating room (OR) management decisions made by the anesthesiologists and nurse managers at a facility that do not maximize the efficiency of use of OR time. We evaluated whether event-based knowledge elicitation can be used practically for rapid assessment of OR management decision-making at facilities, whether scenarios can be adapted automatically from information systems data, and the usefulness of the approach. A process of event-based knowledge elicitation was developed to assess OR management decision-making that may reduce the efficiency of use of OR time. Hypothetical scenarios addressing every OR management decision influencing OR efficiency were created from published examples. Scenarios are adapted, so that cues about conditions are accurate and appropriate for each facility (e.g., if OR 1 is used as an example in a scenario, the listed procedure is a type of procedure performed at the facility in OR 1). Adaptation is performed automatically using the facility's OR information system or anesthesia information management system (AIMS) data for most scenarios (43 of 45). Performing the needs assessment takes approximately 1 hour of local managers' time while they decide if their decisions are consistent with the described scenarios. A table of contents of the indexed scenarios is created automatically, providing a simple version of problem solving using case-based reasoning. For example, a new OR manager wanting to know the best way to decide whether to move a case can look in the chapter on "Moving Cases on the Day of Surgery" to find a scenario that describes the situation being encountered. Scenarios have been adapted and used at 22 hospitals. Few changes in decisions were needed to increase the efficiency of use of OR time. The few changes were heterogeneous among hospitals, showing the usefulness of individualized assessments. Our technical advance is the

  16. A Plan to Develop a Red Tide Warning System for Seawater Desalination Process Management

    NASA Astrophysics Data System (ADS)

    Kim, Tae Woo; Yun, Hong Sik

    2017-04-01

    The holt of the seawater desalination process for fifty five days due to the eight-month long red tide in 2008 in the Persian Gulf, the Middle East, had lost about 10 billion KRW. The POSCO Seawater Desalination facility, located in Gwangyang Bay Area in the Southern Sea, has produced 30,000 tons of fresh water per day since 2014. Since there has been an incident of red time in the area for three months in August, 2012, it is necessary to establish a warning system for red tide that threatens the stable operation of the seawater desalination facility. A red tide warning system can offer the seawater desalination facility manager customized services on red tide information and potential red tide inflow to the water intake. This study aimed to develop a red tide warning system in Gwangyang Bay Area by combining RS, modeling and monitoring technologies, which provides red tide forecasting information with which to effectively control the seawater desalination process. Using the proposed system, the seawater desalination facility manager can take phased measures to cope with the inflow of red tide. ACKNOWLEDGMENTS This research was supported by a grant(16IFIP-C088924-03) from Industrial Facilities & Infrastructure Research Program funded by Ministry of Land, Infrastructure and Transport(MOLIT) of the Korea government and the Korea Agency for Infrastructure Technology Advancement (KAIA). This research was supported by Basic Science Research Program through the National Research Foundation of Korea(NRF) funded by the Ministry of Education(NRF-2014R1A1A2054975).

  17. Facilities Information Management: A Guide for State and Local Education Agencies. NCES 2003-400

    ERIC Educational Resources Information Center

    National Center for Education Statistics (ED), Washington, DC.

    This Guide has been developed to provide a framework for decision makers, school facility managers, and the public to identify a basic set of school facilities data elements, including definitions that will meet their information needs. Chapter 1 describes the purpose, scope, and intended audience for this guide. Chapter 2 describes how to use the…

  18. 25 CFR 170.503 - How are IRR Program management systems funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program management systems funded? 170.503 Section 170.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  19. Beyond strategy: exploring the brokerage role of facilities manager in hospitals.

    PubMed

    Heng, H K S; McGeorge, W D; Loosemore, M

    2005-01-01

    Seeks to explore the brokerage role of facilities manager in hospitals, based on the premise that facilities management (FM) is largely concerned with "strategic brokerage". Strategic brokerage is the term coined by Akhaghi to explain the integration of a wide range of support services to ensure the effective operation of the core business of an organization. The research was conducted in the health service sector using a single case study approach to examine the brokerage potential for FM in a hospital in the Sydney Metropolitan area. A social network analysis technique was used to identify and analyse the communication networks of players in a hospital environment. Two general questions guided the analysis. First, what is the brokerage potential within the FM process? Second, where are the opportunities for brokerage? The results indicate that identifying relationship linkages between different functional units can create potential brokerage opportunities. The proposition is made that viewing FM from a brokerage perspective can add value to the delivery of health-care services.

  20. A system management methodology for building successful resource management systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1989-01-01

    This paper presents a system management methodology for building successful resource management systems that possess lifecycle effectiveness. This methodology is based on an analysis of the traditional practice of Systems Engineering Management as it applies to the development of resource management systems. The analysis produced fifteen significant findings presented as recommended adaptations to the traditional practice of Systems Engineering Management to accommodate system development when the requirements are incomplete, unquantifiable, ambiguous and dynamic. Ten recommended adaptations to achieve operational effectiveness when requirements are incomplete, unquantifiable or ambiguous are presented and discussed. Five recommended adaptations to achieve system extensibility when requirements are dynamic are also presented and discussed. The authors conclude that the recommended adaptations to the traditional practice of Systems Engineering Management should be implemented for future resource management systems and that the technology exists to build these systems extensibly.

  1. Higher Education Facilities: The SmartGrid Earns a Doctorate in Economics

    ERIC Educational Resources Information Center

    Tysseling, John C.; Zibelman, Audrey; Freifeld, Allen

    2011-01-01

    Most higher education facilities have already accomplished some measure of a "microgrid" investment with building control systems (BCS), energy management systems (EMS), and advanced metering infrastructure (AMI) installations. Available energy production facilities may include boilers, chillers, cogeneration, thermal storage, electrical…

  2. Health managers' perception of the primary health care management information system: a case of Bama Local Government in northern Nigeria.

    PubMed

    Adindu, A; Babatunde, S

    2006-01-01

    Evaluating the quality and performance of Primary Health Care (PHC) systems depend on the information system's capacity to generate reliable and accurate information, within social, cultural, and economic context. This paper reports an assessment of a PHC health management information system from PHC Managers'perspectives, An adapted 3-part Donabedian model informed our assessment of the structure, process and outcomes of the PHC health information system. Pre-tested, semi-structured questionnaires were administered to the PHC Coordinator, 6 Deputy Coordinators, and 18 officers responsible for the health facilities in Bama Local Government Area of Borno State. Majority of the respondents (n=11) believed that staffing at PHC level was inadequate. Only 5 (27.8%) of the managers had training specific to completing HMIS forms. All the facilities were reported to possess registers for the study year (1993), but their numbers dropped by half consecutively down the preceding years to 1990. None reported a health facility that had a copy of the requisite M&E manual guide to HIMIS. Nonetheless 14 reported that report submissions were timely; chief factors causing delays were lack of transport (35.5%), bad roads (16.1%), and scarcity of forms (9.7%). Twelve (12) of the managers judged that the data collected were always or sometimes accurate. Though only 5 crosschecked data to verify accuracy of the submissions. Eight (8) were of the opinion that computerisation was not necessary for rural PHC information system, and eleven (11) felt that the Bama PHC was not ready for computerisation. Twelve (12) of them felt that the quality of the PHC information system had improved since its devolution to the LGA, however, the main suggestions offered to improve the MIS in general were personnel training (32%), feedback from higher levels (20%), and availability of transportation (16%). The information system is only as good as the organisation it serves. Results of this study show

  3. Situation analysis and issues in management of biomedical waste in select small health care facilities in a ward under Bruhat Bengaluru Mahanagara Palike, Bangalore, India.

    PubMed

    Chethana, Thirthahalli; Thapsey, Hemanth; Gautham, Melur Sukumar; Sreekantaiah, Pruthvish; Suryanarayana, Suradhenupura Puttajois

    2014-04-01

    Smaller health care facilities especially clinics though believed to generate lesser quantum/categories of medical waste, the number of clinics/small health care settings are considerable. The movement to manage biomedical waste in a safe and scientific manner has gathered momentum among the medium and large hospitals in Bangalore, but there has been a little understanding and focus on the smaller health care facilities/clinics in this aspect. It is important to gather evidence regarding the current situation of bio-medical waste (BMW) management and issues in smaller health care settings, so as to expand the safe management to all points of generation in Bangalore and will also help to plan relevant interventional strategies for the same. Hence an exploratory study was conducted to assess the current situation and issues in management of BMW among small health care facilities (sHCF). This cross sectional study was conducted in T. Dasarahalli (ward number 15) under Bruhat Bengaluru Mahanagar Palike (BBMP) of Bangalore. Data was collected from a convenient sample of 35 nursing homes (<50 beds) and clinics in December 2011. The results of this study indicate that 3 (20 %) of nursing homes had a Policy for Health Care Waste Management, though committees for Infection control and Hospital waste management were absent. Recording system like injury and waste management registers were non-existent. In our study the Common Bio-medical Waste Treatment Facility operator collected waste from 28 (80 %) of the sHCF. Segregation at the point of generation was present in 22 (62.9 %) of the sHCF. Segregation process was compliant as per BMW rules 1998 among 5 (16.1 %) of the sHCF. 18 sHCF workers were vaccinated with hepatitis B and tetanus. Deficiencies were observed in areas of containment, sharps management and disinfection. It was observed that though the quantum and category of waste generated was limited there exist deficiencies which warrant initiation of system development

  4. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Test system supply facilities. 792.45 Section 792.45 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES... facilities. (a) There shall be storage areas, as needed, for feed, nutrients, soils, bedding, supplies, and...

  5. Lightning Protection System for HE Facilities at LLNL - Certification Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clancy, T J; Ong, M M; Brown, C G

    2005-12-08

    This document is meant as a template to assist in the development of your own lighting certification process. Aside from this introduction and the mock representative name of the building (Building A), this document is nearly identical to a lightning certification report issued by the Engineering Directorate at Lawrence Livermore National Laboratory. At the date of this release, we have certified over 70 HE processing and storage cells at our Site 300 facilities. In Chapters 1 and 2 respectively, we address the need and methods of lightning certification for HE processing and storage facilities at LLNL. We present the preferredmore » method of lightning protection in Chapter 3, as well as the likely building modifications that are needed to comply with this method. In Chapter 4, we present the threat assessment and resulting safe work areas within a cell. After certification, there may be changes to operations during a lightning alert, and this is discussed in Chapter 5. Chapter 6 lists the maintenance requirements for the continuation of lighting certification status. Appendices of this document are meant as an aid in developing your own certification process, and they include a bonding list, an inventory of measurement equipment, surge suppressors in use at LLNL, an Integrated Work and Safety form (IWS), and a template certification sign-off sheet. The lightning certification process involves more that what is spelled out in this document. The first steps involve considerable planning, the securing of funds, and management and explosives safety buy-in. Permits must be obtained, measurement equipment must be assembled and tested, and engineers and technicians must be trained in their use. Cursory building inspections are also recommended, and surge suppression for power systems must be addressed. Upon completion of a certification report and its sign-off by management, additional work is required. Training will be needed in order to educate workers and facility

  6. Characterization and environmental management of stormwater runoff from road-salt storage facilities.

    DOT National Transportation Integrated Search

    2004-01-01

    The objectives of this study were to assess the quantity and quality of salt-contaminated water generated from stormwater runoff at VDOT's salt storage facilities and to evaluate management/treatment alternatives to reduce costs and better protect th...

  7. Registered nurses' medication management of the elderly in aged care facilities.

    PubMed

    Lim, L M; Chiu, L H; Dohrmann, J; Tan, K-L

    2010-03-01

    Data on adverse drug reactions (ADRs) showed a rising trend in the elderly over 65 years using multiple medications. To identify registered nurses' (RNs) knowledge of medication management and ADRs in the elderly in aged care facilities; evaluate an education programme to increase pharmacology knowledge and prevent ADRs in the elderly; and develop a learning programme with a view to extending provision, if successful. This exploratory study used a non-randomized pre- and post-test one group quasi-experimental design without comparators. It comprised a 23-item knowledge-based test questionnaire, one-hour teaching session and a self-directed learning package. The volunteer sample was RNs from residential aged care facilities, involved in medication management. Participants sat a pre-test immediately before the education, and post-test 4 weeks later (same questionnaire). Participants' perceptions obtained. Pre-test sample n = 58, post-test n = 40, attrition rate of 31%. Using Microsoft Excel 2000, descriptive statistical data analysis of overall pre- and post-test incorrect responses showed: pre-test proportion of incorrect responses = 0.40; post-test proportion of incorrect responses = 0.27; Z-test comparing pre- and post-tests scores of incorrect responses = 6.55 and one-sided P-value = 2.8E-11 (P < 0.001). Pre-test showed knowledge deficits in medication management and ADRs in the elderly; post-test showed statistically significant improvement in RNs' knowledge. It highlighted a need for continuing professional education. Further studies are required on a larger sample of RNs in other aged care facilities, and on the clinical impact of education by investigating nursing practice and elderly residents' outcomes.

  8. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  9. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  10. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  11. Building capacity in health facility management: guiding principles for skills transfer in Liberia.

    PubMed

    Rowe, Laura A; Brillant, Sister Barbara; Cleveland, Emily; Dahn, Bernice T; Ramanadhan, Shoba; Podesta, Mae; Bradley, Elizabeth H

    2010-03-18

    Management training is fundamental to developing human resources for health. Particularly as Liberia revives its health delivery system, facility and county health team managers are central to progress. Nevertheless, such management skills are rarely prioritized in health training, and sustained capacity building in this area is limited. We describe a health management delivery program in which a north and south institution collaborated to integrate classroom and field-based training in health management and to transfer the capacity for sustained management development in Liberia. We developed and implemented a 6-month training program in health management skills (i.e. strategic problem solving, financial management, human resource management and leadership) delivered by Yale University and Mother Patern College from Liberia, with support from the Clinton HIV/AIDS Initiative. Over three 6-month cycles, responsibility for course instruction was transferred from the north institution to the south institution. A self-administered survey was conducted of all participants completing the course to measure changes in self-rated management skills, the degree to which the course was helpful and met its stated objectives, and faculty members' responsiveness to participant needs as the transfer process occurred. Respondents (n=93, response rate 95.9%) reported substantial improvement in self-reported management skills, and rated the helpfulness of the course and the degree to which the course met its objectives highly. Levels of improvement and course ratings were similar over the three cohorts as the course was transferred to the south institution. We suggest a framework of five elements for implementing successful management training programs that can be transferred and sustained in resource-limited settings, including: 1) use a short-course format focusing on four key skill areas with practical tools; 2) include didactic training, on-site projects, and on-site mentoring; 3

  12. Building capacity in health facility management: guiding principles for skills transfer in Liberia

    PubMed Central

    2010-01-01

    Background Management training is fundamental to developing human resources for health. Particularly as Liberia revives its health delivery system, facility and county health team managers are central to progress. Nevertheless, such management skills are rarely prioritized in health training, and sustained capacity building in this area is limited. We describe a health management delivery program in which a north and south institution collaborated to integrate classroom and field-based training in health management and to transfer the capacity for sustained management development in Liberia. Methods We developed and implemented a 6-month training program in health management skills (i.e. strategic problem solving, financial management, human resource management and leadership) delivered by Yale University and Mother Patern College from Liberia, with support from the Clinton HIV/AIDS Initiative. Over three 6-month cycles, responsibility for course instruction was transferred from the north institution to the south institution. A self-administered survey was conducted of all participants completing the course to measure changes in self-rated management skills, the degree to which the course was helpful and met its stated objectives, and faculty members' responsiveness to participant needs as the transfer process occurred. Results Respondents (n = 93, response rate 95.9%) reported substantial improvement in self-reported management skills, and rated the helpfulness of the course and the degree to which the course met its objectives highly. Levels of improvement and course ratings were similar over the three cohorts as the course was transferred to the south institution. We suggest a framework of five elements for implementing successful management training programs that can be transferred and sustained in resource-limited settings, including: 1) use a short-course format focusing on four key skill areas with practical tools; 2) include didactic training, on

  13. Site maps and facilities listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less

  14. Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, Don; Barton, David; Case, Glenn

    2013-07-01

    The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibilitymore » for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary

  15. Patient-, health worker-, and health facility-level determinants of correct malaria case management at publicly funded health facilities in Malawi: results from a nationally representative health facility survey.

    PubMed

    Steinhardt, Laura C; Chinkhumba, Jobiba; Wolkon, Adam; Luka, Madalitso; Luhanga, Misheck; Sande, John; Oyugi, Jessica; Ali, Doreen; Mathanga, Don; Skarbinski, Jacek

    2014-02-20

    Prompt and effective case management is needed to reduce malaria morbidity and mortality. However, malaria diagnosis and treatment is a multistep process that remains problematic in many settings, resulting in missed opportunities for effective treatment as well as overtreatment of patients without malaria. Prior to the widespread roll-out of malaria rapid diagnostic tests (RDTs) in late 2011, a national, cross-sectional, complex-sample, health facility survey was conducted in Malawi to assess patient-, health worker-, and health facility-level factors associated with malaria case management quality using multivariate Poisson regression models. Among the 2,019 patients surveyed, 34% had confirmed malaria defined as presence of fever and parasitaemia on a reference blood smear. Sixty-seven per cent of patients with confirmed malaria were correctly prescribed the first-line anti-malarial, with most cases of incorrect treatment due to missed diagnosis; 31% of patients without confirmed malaria were overtreated with an anti-malarial. More than one-quarter of patients were not assessed for fever or history of fever by health workers. The most important determinants of correct malaria case management were patient-level clinical symptoms, such as spontaneous complaint of fever to health workers, which increased both correct treatment and overtreatment by 72 and 210%, respectively (p<0.0001). Complaint of cough was associated with a 27% decreased likelihood of correct malaria treatment (p=0.001). Lower-level cadres of health workers were more likely to prescribe anti-malarials for patients, increasing the likelihood of both correct treatment and overtreatment, but no other health worker or health facility-level factors were significantly associated with case management quality. Introduction of RDTs holds potential to improve malaria case management in Malawi, but health workers must systematically assess all patients for fever, and then test and treat accordingly

  16. Building Air Quality: A Guide for Building Owners and Facility Managers.

    ERIC Educational Resources Information Center

    Agle, Elizabeth; Galbraith, Susan

    The past two decades have witnessed increased concerns over the health and comfort of indoor air quality (IAQ), but little indoor air-related information has been targeted at building owners and facility managers of public and commercial buildings. This manual, specifically created for such a population, provides guidance on preventing,…

  17. The deep space network, volume 18. [Deep Space Instrumentation Facility, Ground Communication Facility, and Network Control System

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The objectives, functions, and organization of the Deep Space Network are summarized. The Deep Space Instrumentation Facility, the Ground Communications Facility, and the Network Control System are described.

  18. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    for its novel approach to energy reduction. The ultra-efficient ESIF data center features a chiller "chips to bricks" approach to sustainability integrates the data center into the facility systems, rather than trying to optimize each in isolation. Key to the approach was collaboration with

  19. An assessment of maintainability of elevator system to improve facilities management knowledge-base

    NASA Astrophysics Data System (ADS)

    Siti, N. A.; Asmone, A. S.; Chew, M. Y. L.

    2018-02-01

    Elevator system is a highly specialized machinery that requires technicians that have a wider array of knowledge in maintaining the system to be safe and reliable. While attaining reliable data of elevator malfunction become challenges, this study has filled the gap by gathering the management-maintenance issues and operational defects of elevator system. Forty-three types of operation defects were found and the consequence defects and their possible causes of occurrences were discussed. To respond to the prime challenges of maintaining elevator system provided by the industry players’ perspective, a theoretical framework is established as a recommendation to improve knowledge base of defects in elevator system which comprises good practices, and solutions to rectify each defects found. Hence, this research paper has theoretically improved the knowledge base of maintainability of elevator system and provide meaningful guidelines in practical senses to the industry professionals.

  20. INDUSTRIAL CONTROL SYSTEM CYBER SECURITY: QUESTIONS AND ANSWERS RELEVANT TO NUCLEAR FACILITIES, SAFEGUARDS AND SECURITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert S. Anderson; Mark Schanfein; Trond Bjornard

    2011-07-01

    Typical questions surrounding industrial control system (ICS) cyber security always lead back to: What could a cyber attack do to my system(s) and; how much should I worry about it? These two leading questions represent only a fraction of questions asked when discussing cyber security as it applies to any program, company, business, or organization. The intent of this paper is to open a dialog of important pertinent questions and answers that managers of nuclear facilities engaged in nuclear facility security and safeguards should examine, i.e., what questions should be asked; and how do the answers affect an organization's abilitymore » to effectively safeguard and secure nuclear material. When a cyber intrusion is reported, what does that mean? Can an intrusion be detected or go un-noticed? Are nuclear security or safeguards systems potentially vulnerable? What about the digital systems employed in process monitoring, and international safeguards? Organizations expend considerable efforts to ensure that their facilities can maintain continuity of operations against physical threats. However, cyber threats particularly on ICSs may not be well known or understood, and often do not receive adequate attention. With the disclosure of the Stuxnet virus that has recently attacked nuclear infrastructure, many organizations have recognized the need for an urgent interest in cyber attacks and defenses against them. Several questions arise including discussions about the insider threat, adequate cyber protections, program readiness, encryption, and many more. These questions, among others, are discussed so as to raise the awareness and shed light on ways to protect nuclear facilities and materials against such attacks.« less

  1. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  2. Earth-Mars Telecommunications and Information Management System (TIMS): Antenna Visibility Determination, Network Simulation, and Management Models

    NASA Technical Reports Server (NTRS)

    Odubiyi, Jide; Kocur, David; Pino, Nino; Chu, Don

    1996-01-01

    This report presents the results of our research on Earth-Mars Telecommunications and Information Management System (TIMS) network modeling and unattended network operations. The primary focus of our research is to investigate the feasibility of the TIMS architecture, which links the Earth-based Mars Operations Control Center, Science Data Processing Facility, Mars Network Management Center, and the Deep Space Network of antennae to the relay satellites and other communication network elements based in the Mars region. The investigation was enhanced by developing Build 3 of the TIMS network modeling and simulation model. The results of several 'what-if' scenarios are reported along with reports on upgraded antenna visibility determination software and unattended network management prototype.

  3. Astronomic Telescope Facility: Preliminary systems definition study report. Volume 2: Technical description

    NASA Technical Reports Server (NTRS)

    Sobeck, Charlie (Editor)

    1987-01-01

    The Astrometric Telescope Facility (AFT) is to be an earth-orbiting facility designed specifically to measure the change in relative position of stars. The primary science investigation for the facility will be the search for planets and planetary systems outside the solar system. In addition the facility will support astrophysics investigations dealing with the location or motions of stars. The science objective and facility capabilities for astrophysics investigations are discussed.

  4. Improvement of the management of residual waste in areas without thermal treatment facilities: A life cycle analysis of an Italian management district

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Maria, Francesco, E-mail: francesco.dimaria@unipg.it; Micale, Caterina; Morettini, Emanuela

    2015-10-15

    Highlights: • LCA analysis of two option for residual waste management. • Exploitation of mechanical physical sorting facility for extracting recyclable from RMSW. • Processing the mechanically sorted organic fraction in bioreactor landfill. • Sensitivity analysis demonstrate high influence for impact assessment of substitution ratio for recycle materials. - Abstract: Starting from an existing waste management district without thermal treatment facilities, two different management scenarios for residual waste were compared by life cycle assessment (LCA). The adoption of a bioreactor landfill for managing the mechanically sorted organic fraction instead of bio-stabilization led to reduction of global warming and fresh watermore » eutrophication by 50% and 10%, respectively. Extraction of recyclables from residual waste led to avoided emissions for particulate matter, acidification and resource depletion impact categories. Marginal energy and the amount of energy recovered from landfill gas marginally affected the LCA results. On the contrary the quality of the recyclables extracted can significantly modify the eco profile of the management schemes.« less

  5. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habib, T F; Koksal, C G; Moskal, T E

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility --more » the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs.« less

  6. A rapid prototyping facility for flight research in advanced systems concepts

    NASA Technical Reports Server (NTRS)

    Duke, Eugene L.; Brumbaugh, Randal W.; Disbrow, James D.

    1989-01-01

    The Dryden Flight Research Facility of the NASA Ames Research Facility of the NASA Ames Research Center is developing a rapid prototyping facility for flight research in flight systems concepts that are based on artificial intelligence (AI). The facility will include real-time high-fidelity aircraft simulators, conventional and symbolic processors, and a high-performance research aircraft specially modified to accept commands from the ground-based AI computers. This facility is being developed as part of the NASA-DARPA automated wingman program. This document discusses the need for flight research and for a national flight research facility for the rapid prototyping of AI-based avionics systems and the NASA response to those needs.

  7. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  8. Toward interactive scheduling systems for managing medical resources.

    PubMed

    Oddi, A; Cesta, A

    2000-10-01

    Managers of medico-hospital facilities are facing two general problems when allocating resources to activities: (1) to find an agreement between several and contrasting requirements; (2) to manage dynamic and uncertain situations when constraints suddenly change over time due to medical needs. This paper describes the results of a research aimed at applying constraint-based scheduling techniques to the management of medical resources. A mixed-initiative problem solving approach is adopted in which a user and a decision support system interact to incrementally achieve a satisfactory solution to the problem. A running prototype is described called Interactive Scheduler which offers a set of functionalities for a mixed-initiative interaction to cope with the medical resource management. Interactive Scheduler is endowed with a representation schema used for describing the medical environment, a set of algorithms that address the specific problems of the domain, and an innovative interaction module that offers functionalities for the dialogue between the support system and its user. A particular contribution of this work is the explicit representation of constraint violations, and the definition of scheduling algorithms that aim at minimizing the amount of constraint violations in a solution.

  9. Data management and data enrichment for systems biology projects.

    PubMed

    Wittig, Ulrike; Rey, Maja; Weidemann, Andreas; Müller, Wolfgang

    2017-11-10

    Collecting, curating, interlinking, and sharing high quality data are central to de.NBI-SysBio, the systems biology data management service center within the de.NBI network (German Network for Bioinformatics Infrastructure). The work of the center is guided by the FAIR principles for scientific data management and stewardship. FAIR stands for the four foundational principles Findability, Accessibility, Interoperability, and Reusability which were established to enhance the ability of machines to automatically find, access, exchange and use data. Within this overview paper we describe three tools (SABIO-RK, Excemplify, SEEK) that exemplify the contribution of de.NBI-SysBio services to FAIR data, models, and experimental methods storage and exchange. The interconnectivity of the tools and the data workflow within systems biology projects will be explained. For many years we are the German partner in the FAIRDOM initiative (http://fair-dom.org) to establish a European data and model management service facility for systems biology. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  10. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  11. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  12. Quality of child healthcare at primary healthcare facilities: a national assessment of the Integrated Management of Childhood Illnesses in Afghanistan.

    PubMed

    Mansoor, Ghulam Farooq; Chikvaidze, Paata; Varkey, Sherin; Higgins-Steele, Ariel; Safi, Najibullah; Mubasher, Adela; Yusufi, Khaksar; Alawi, Sayed Alisha

    2017-02-01

    To assess quality of the national Integrated Management of Childhood Illness (IMCI) program services provided for sick children at primary health facilities in Afghanistan. Mixed methods including cross-sectional study. Thirteen (of thirty-four) provinces in Afghanistan. Observation of case management and re-examination of 177 sick children, exit interviews with caretakers and review of equipment/supplies at 44 health facilities. Introduction and scale up of Integrated Management of Childhood Illnesses at primary health care facilities. Care of sick children according to IMCI guidelines, health worker skills and essential health system elements. Thirty-two (71%) of the health workers were trained in IMCI and five (11%) received supervision in clinical case management during the past 6 months. On average, 5.4 out of 10 main assessment tasks were performed during cases observed, the index being higher in children seen by trained providers than untrained (6.3 vs 3.5, 95% CI 5.8-6.8 vs 2.9-4.1). In all, 74% of the 104 children who needed oral antibiotics received prescriptions, while 30% received complete and correct advice and 30% were overprescribed, and more so by untrained providers. Home care counseling was associated with provider training status (41.3% by trained and 24.5% by untrained). Essential oral and pre-referral injectable medicine and equipment/supplies were available in 66%, 23%, and 45% of health facilities, respectively. IMCI training improved assessment, rational use of antibiotics and counseling; further investment in IMCI in Afghanistan, continuing provider capacity building and supportive supervision for improved quality of care and counseling for sick children is needed, especially given high burden treatable childhood illness. © The Author 2016. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  13. 75 FR 58346 - Hazardous Waste Management System; Identification and Listing of Hazardous Waste

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Chemical Company-Texas Operations (Eastman) to exclude (or delist) certain solid wastes generated by its Longview, Texas, facility from the lists of hazardous wastes. EPA used the Delisting Risk Assessment... Waste Management System; Identification and Listing of Hazardous Waste AGENCY: Environmental Protection...

  14. Thermal Vacuum Control Systems Options for Test Facilities

    NASA Technical Reports Server (NTRS)

    Marchetti, John

    2008-01-01

    This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.

  15. Next Generation Workload Management System For Big Data on Heterogeneous Distributed Computing

    DOE PAGES

    Klimentov, A.; Buncic, P.; De, K.; ...

    2015-05-22

    The Large Hadron Collider (LHC), operating at the international CERN Laboratory in Geneva, Switzerland, is leading Big Data driven scientific explorations. Experiments at the LHC explore the fundamental nature of matter and the basic forces that shape our universe, and were recently credited for the discovery of a Higgs boson. ATLAS and ALICE are the largest collaborations ever assembled in the sciences and are at the forefront of research at the LHC. To address an unprecedented multi-petabyte data processing challenge, both experiments rely on a heterogeneous distributed computational infrastructure. The ATLAS experiment uses PanDA (Production and Data Analysis) Workload Managementmore » System (WMS) for managing the workflow for all data processing on hundreds of data centers. Through PanDA, ATLAS physicists see a single computing facility that enables rapid scientific breakthroughs for the experiment, even though the data centers are physically scattered all over the world. The scale is demonstrated by the following numbers: PanDA manages O(10 2) sites, O(10 5) cores, O(10 8) jobs per year, O(10 3) users, and ATLAS data volume is O(10 17) bytes. In 2013 we started an ambitious program to expand PanDA to all available computing resources, including opportunistic use of commercial and academic clouds and Leadership Computing Facilities (LCF). The project titled 'Next Generation Workload Management and Analysis System for Big Data' (BigPanDA) is funded by DOE ASCR and HEP. Extending PanDA to clouds and LCF presents new challenges in managing heterogeneity and supporting workflow. The BigPanDA project is underway to setup and tailor PanDA at the Oak Ridge Leadership Computing Facility (OLCF) and at the National Research Center "Kurchatov Institute" together with ALICE distributed computing and ORNL computing professionals. Our approach to integration of HPC platforms at the OLCF and elsewhere is to reuse, as much as possible, existing components of the Pan

  16. Next Generation Workload Management System For Big Data on Heterogeneous Distributed Computing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimentov, A.; Buncic, P.; De, K.

    The Large Hadron Collider (LHC), operating at the international CERN Laboratory in Geneva, Switzerland, is leading Big Data driven scientific explorations. Experiments at the LHC explore the fundamental nature of matter and the basic forces that shape our universe, and were recently credited for the discovery of a Higgs boson. ATLAS and ALICE are the largest collaborations ever assembled in the sciences and are at the forefront of research at the LHC. To address an unprecedented multi-petabyte data processing challenge, both experiments rely on a heterogeneous distributed computational infrastructure. The ATLAS experiment uses PanDA (Production and Data Analysis) Workload Managementmore » System (WMS) for managing the workflow for all data processing on hundreds of data centers. Through PanDA, ATLAS physicists see a single computing facility that enables rapid scientific breakthroughs for the experiment, even though the data centers are physically scattered all over the world. The scale is demonstrated by the following numbers: PanDA manages O(10 2) sites, O(10 5) cores, O(10 8) jobs per year, O(10 3) users, and ATLAS data volume is O(10 17) bytes. In 2013 we started an ambitious program to expand PanDA to all available computing resources, including opportunistic use of commercial and academic clouds and Leadership Computing Facilities (LCF). The project titled 'Next Generation Workload Management and Analysis System for Big Data' (BigPanDA) is funded by DOE ASCR and HEP. Extending PanDA to clouds and LCF presents new challenges in managing heterogeneity and supporting workflow. The BigPanDA project is underway to setup and tailor PanDA at the Oak Ridge Leadership Computing Facility (OLCF) and at the National Research Center "Kurchatov Institute" together with ALICE distributed computing and ORNL computing professionals. Our approach to integration of HPC platforms at the OLCF and elsewhere is to reuse, as much as possible, existing components of the Pan

  17. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    , consider the tangible benefits it can bring to utilities and the developer community, and discuss the Energy Systems Integration Facility on July 13 and 14, 2016, to discuss current and future R&D to researching this topic from a technology, business process, and policy perspective. This workshop is an

  18. Development of a neutron measurement system in unified non-destructive assay for the PRIDE facility

    NASA Astrophysics Data System (ADS)

    Seo, Hee; Park, Se-Hwan; Won, Byung-Hee; Ahn, Seong-Kyu; Shin, Hee-Sung; Na, Sang-Ho; Song, Dae-Yong; Kim, Ho-Dong; Lee, Seung Kyu

    2013-12-01

    The Korea Atomic Energy Research Institute (KAERI) has made an effort to develop pyroprocessing technology to resolve an on-going problem in Korea, i.e., the management of spent nuclear fuels. To this end, a test-bed facility for pyroprocessing, called PRIDE (PyRoprocessing Integrated inactive DEmonstration facility), is being constructed at KAERI. The main objective of PRIDE is to evaluate the performance of the unit processes, remote operation, maintenance, and proliferation resistance. In addition, integrating all unit processes into a one-step process is also one of the main goals. PRIDE can also provide a good opportunity to test safeguards instrumentations for a pyroprocessing facility such as nuclear material accounting devices, surveillance systems, radiation monitoring systems, and process monitoring systems. In the present study, a non-destructive assay (NDA) system for the testing of nuclear material accountancy of PRIDE was designed by integrating three different NDA techniques, i.e., neutron, gamma-ray, and mass measurements. The developed neutron detection module consists of 56 3He tubes and 16 AMPTEK A111 signal processing circuits. The amplifiers were matched in terms of the gain and showed good uniformity after a gain-matching procedure (%RSD=0.37%). The axial and the radial efficiency distributions within the cavity were then measured using a 252Cf neutron source and were compared with the MCNPX calculation results. The measured efficiency distributions showed excellent agreement with the calculations, which confirmed the accuracy of the MCNPX model of the system.

  19. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  20. Space Station Module Power Management and Distribution System (SSM/PMAD)

    NASA Technical Reports Server (NTRS)

    Miller, William (Compiler); Britt, Daniel (Compiler); Elges, Michael (Compiler); Myers, Chris (Compiler)

    1994-01-01

    This report provides an overview of the Space Station Module Power Management and Distribution (SSM/PMAD) testbed system and describes recent enhancements to that system. Four tasks made up the original contract: (1) common module power management and distribution system automation plan definition; (2) definition of hardware and software elements of automation; (3) design, implementation and delivery of the hardware and software making up the SSM/PMAD system; and (4) definition and development of the host breadboard computer environment. Additions and/or enhancements to the SSM/PMAD test bed that have occurred since July 1990 are reported. These include: (1) rehosting the MAESTRO scheduler; (2) reorganization of the automation software internals; (3) a more robust communications package; (4) the activity editor to the MAESTRO scheduler; (5) rehosting the LPLMS to execute under KNOMAD; implementation of intermediate levels of autonomy; (6) completion of the KNOMAD knowledge management facility; (7) significant improvement of the user interface; (8) soft and incipient fault handling design; (9) intermediate levels of autonomy, and (10) switch maintenance.

  1. National Ignition Facility Laser System Performance

    DOE PAGES

    Spaeth, Mary L.; Manes, Kenneth R.; Bowers, M.; ...

    2017-03-23

    The National Ignition Facility (NIF) laser is the culmination of more than 40 years of work at Lawrence Livermore National Laboratory dedicated to the delivery of laser systems capable of driving experiments for the study of high-energy-density physics. Although NIF was designed to support a number of missions, it was clear from the beginning that its biggest challenge was to meet the requirements for pursuit of inertial confinement fusion. Meeting the Project Completion Criteria for NIF in 2009 and for the National Ignition Campaign (NIC) in 2012 included meeting the NIF Functional Requirements and Primary Criteria that were established formore » the project in 1994. Finally, during NIC and as NIF transitioned to a user facility, its goals were expanded to include requirements defined by the broader user community as well as by laser system designers and operators.« less

  2. Guidelines for the evaluation and assessment of the sustainable use of resources and of wastes management at healthcare facilities.

    PubMed

    Townend, William K; Cheeseman, Christopher R

    2005-10-01

    This paper presents guidelines that can be used by managers of healthcare facilities to evaluate and assess the quality of resources and waste management at their facilities and enabling the principles of sustainable development to be addressed. The guidelines include the following key aspects which need to be considered when completing an assessment. They are: (a) general management; (b) social issues; (c) health and safety; (d) energy and water use; (e) purchasing and supply; (f) waste management (responsibility, segregation, storage and packaging); (g) waste transport; (h) recycling and re-use; (i) waste treatment; and (j) final disposal. They identify actions required to achieve a higher level of performance which can readily be applied to any healthcare facility, irrespective of the local level of social, economic and environmental development. The guidelines are presented, and the characteristics of facilities associated with sustainable (level 4) and unsustainable (level 0) healthcare resource and wastes management are outlined. They have been used to assess a major London hospital, and this highlighted a number of deficiencies in current practice, including a lack of control over purchasing and supply, and very low rates of segregation of municipal solid waste from hazardous healthcare waste.

  3. Evaluating Past and Future USCG Use of Ohmsett Test Facility

    DTIC Science & Technology

    2016-10-01

    and Renewable Energy Test Facility, that was previously known as a fully capitalized acronym, Ohmsett. This facility is located on the U.S. Naval...Oil Spill Response Research and Renewable Energy Test Facility, that was previously known as a fully capitalized acronym, Ohmsett. This facility is...Incident Management Systems NSF National Strike Force NWS Naval Weapons Station Ohmsett National Oil Spill Response Research and Renewable Energy

  4. Tank waste remediation system nuclear criticality safety program management review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  5. Excluded Facility Financial Status and Options for Payment System Modification

    PubMed Central

    Schneider, John E.; Cromwell, Jerry; McGuire, Thomas P.

    1993-01-01

    Psychiatric, rehabilitation, long-term care, and children's facilities have remained under the reimbursement system established under the Tax Equity and Fiscal Responsibility Act (TEFRA) of 1982 (Public Law 97-248). The number of TEFRA facilities and discharges has been increasing while their average profit rates have been steadily declining. Modifying TEFRA would require either rebasing the target amount or adjusting cost sharing for facilities exceeding their cost target. Based on our simulations of alternative payment systems, we recommend rebasing facilities' target amounts using a 50/50 blend of own costs and national average costs. Cost sharing above the target amount could be increased to include more government sharing of losses. PMID:10135345

  6. Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

    NASA Technical Reports Server (NTRS)

    Ross, Richard W.

    2001-01-01

    The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

  7. Facility Management Child Care Resource Book. Child Care Operations Center of Expertise.

    ERIC Educational Resources Information Center

    General Services Administration, Washington, DC. Public Buildings Service.

    This guidebook provides maintenance and operations guidelines for managing General Services Administration (GSA) child care centers within the same standards and level of a GSA operated facility. Areas covered address cleaning standards and guidelines; equipment funding and inventory; maintenance of living environments and problem areas;…

  8. Space Communications Emulation Facility

    NASA Technical Reports Server (NTRS)

    Hill, Chante A.

    2004-01-01

    Establishing space communication between ground facilities and other satellites is a painstaking task that requires many precise calculations dealing with relay time, atmospheric conditions, and satellite positions, to name a few. The Space Communications Emulation Facility (SCEF) team here at NASA is developing a facility that will approximately emulate the conditions in space that impact space communication. The emulation facility is comprised of a 32 node distributed cluster of computers; each node representing a satellite or ground station. The objective of the satellites is to observe the topography of the Earth (water, vegetation, land, and ice) and relay this information back to the ground stations. Software originally designed by the University of Kansas, labeled the Emulation Manager, controls the interaction of the satellites and ground stations, as well as handling the recording of data. The Emulation Manager is installed on a Linux Operating System, employing both Java and C++ programming codes. The emulation scenarios are written in extensible Markup Language, XML. XML documents are designed to store, carry, and exchange data. With XML documents data can be exchanged between incompatible systems, which makes it ideal for this project because Linux, MAC and Windows Operating Systems are all used. Unfortunately, XML documents cannot display data like HTML documents. Therefore, the SCEF team uses XML Schema Definition (XSD) or just schema to describe the structure of an XML document. Schemas are very important because they have the capability to validate the correctness of data, define restrictions on data, define data formats, and convert data between different data types, among other things. At this time, in order for the Emulation Manager to open and run an XML emulation scenario file, the user must first establish a link between the schema file and the directory under which the XML scenario files are saved. This procedure takes place on the command

  9. Video model deformation system for the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Burner, A. W.; Snow, W. L.; Goad, W. K.

    1983-01-01

    A photogrammetric closed circuit television system to measure model deformation at the National Transonic Facility is described. The photogrammetric approach was chosen because of its inherent rapid data recording of the entire object field. Video cameras are used to acquire data instead of film cameras due to the inaccessibility of cameras which must be housed within the cryogenic, high pressure plenum of this facility. A rudimentary theory section is followed by a description of the video-based system and control measures required to protect cameras from the hostile environment. Preliminary results obtained with the same camera placement as planned for NTF are presented and plans for facility testing with a specially designed test wing are discussed.

  10. What Medical Directors Need to Know about Dialysis Facility Water Management.

    PubMed

    Kasparek, Ted; Rodriguez, Oscar E

    2015-06-05

    The medical directors of dialysis facilities have many operational clinic responsibilities, which on first glance, may seem outside the realm of excellence in patient care. However, a smoothly running clinic is integral to positive patient outcomes. Of the conditions for coverage outlined by the Centers for Medicare and Medicaid Services, one most critical to quality dialysis treatment is the provision of safe purified dialysis water, because there are many published instances where clinic failure in this regard has resulted in patient harm. As the clinical leader of the facility, the medical director is obliged to have knowledge of his/her facility's water treatment system to reliably ensure that the purified water used in dialysis will meet the standards for quality set by the Association for the Advancement of Medical Instrumentation and used by the Centers for Medicare and Medicaid Services for conditions for coverage. The methods used to both achieve and maintain these quality standards should be a part of quality assessment and performance improvement program meetings. The steps for water treatment, which include pretreatment, purification, and distribution, are largely the same, regardless of the system used. Each water treatment system component has a specific role in the process and requires individualized maintenance and monitoring. The medical director should provide leadership by being engaged with the process, knowing the facility's source water, and understanding water treatment system operation as well as the clinical significance of system failure. Successful provision of quality water will be achieved by those medical directors who learn, know, and embrace the requirements of dialysis water purification and system maintenance. Copyright © 2015 by the American Society of Nephrology.

  11. Seasonal Variation of Infiltration Rates in a Managed Aquifer Recharge System: A Belgian Example

    NASA Astrophysics Data System (ADS)

    Samanta, S.; Sheng, Z.; Munster, C. L.; Houtte, E. V.

    2017-12-01

    Managed Aquifer Recharge (MAR) is a powerful tool in addressing water resources management issues. The Torreele water reuse facility is using MAR to address the problem of water sustainability in a coastal aquifer of Belgium. The Torreele MAR facility uses infiltration ponds to maintain the groundwater level and to prevent saltwater intrusion into the aquifer. The source of recharge is treated wastewater from the Torreele wastewater treatment plant (TWWTP) located 1.2 km inland. The TWWTP uses a state-of-the-art filtration mechanism with a combination of ultrafiltration (UF) and Reverse Osmosis (RO) techniques to assure that recharge water is of very high quality. Data collected at the Torreele MAR facility indicates reduced infiltration rates during the winter season when pond water temperatures vary from 1 to 10ºC. The proposed hypothesis for these lower infiltration rates may be a reduction in hydraulic conductivity due to changes in water viscosity. This study involves the determination of relationship between water temperature, infiltration rates, and hydraulic conductivity at the Torreele MAR facility. The results of this study will lead to an effective administration of the facility and provide an extensive understanding of the system.

  12. Water management in the framework of environmental management systems in Bulgarian seaports

    NASA Astrophysics Data System (ADS)

    Quynh, Le Xuan; Hens, Luc; Stoyanov, Stoyan

    Seaports or harbours are major hub of economic activities, connecting sea routes with the hinterland via rail, road and inland waterway. At the same time, they are hubs of environmental issues, resulting from its diversified operations involving vessels, machines, vehicles and industries. The Black Sea Commission in 2007 pointed out that water pollution at the ports around Black Sea, including the ports of Bourgas and Varna, poses a great threat to the overall water quality of the Black Sea and the quality of the Mediterranean Sea. The two ports, and their facilities, are the black spots of pollution that need immediate intervention to safeguard the Black Sea. The first steps of an environmental management system were implemented at both ports. Environmental protection objectives are identified and initial actions are being implemented. However, assessment of the environmental performance of both ports based on concrete indicators was not done. Further efforts are needed to advance the environmental management system to contribute more to the protection of the Mediterranean and Black Sea region.

  13. CVD facility electrical system captor/dapper study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SINGH, G.

    1999-10-28

    Project W-441, CVD Facility Electrical System CAPTOWDAPPER Study validates Meier's hand calculations. This study includes Load flow, short circuit, voltage drop, protective device coordination, and transient motor starting (TMS) analyses.

  14. Study on Customer Satisfaction with Facilities Management Services in Lithuania

    NASA Astrophysics Data System (ADS)

    Lepkova, Natalija; Žūkaitė-Jefimovienė, Giedrė

    2012-12-01

    The article introduces the concept and content of facilities management (FM) services. The paper presents the concept of customer satisfaction and discusses the key factors which influence the opinions of customers and their satisfaction or dissatisfaction with the services provided. The article presents two studies: a brief survey of several FM service providers and a survey of customer satisfaction with FM services in Lithuania. The conclusions are given at the end of the article.

  15. The keys to CERN conference rooms - Managing local collaboration facilities in large organisations

    NASA Astrophysics Data System (ADS)

    Baron, T.; Domaracky, M.; Duran, G.; Fernandes, J.; Ferreira, P.; Gonzalez Lopez, J. B.; Jouberjean, F.; Lavrut, L.; Tarocco, N.

    2014-06-01

    For a long time HEP has been ahead of the curve in its usage of remote collaboration tools, like videoconference and webcast, while the local CERN collaboration facilities were somewhat behind the expected quality standards for various reasons. This time is now over with the creation by the CERN IT department in 2012 of an integrated conference room service which provides guidance and installation services for new rooms (either equipped for videoconference or not), as well as maintenance and local support. Managing now nearly half of the 246 meeting rooms available on the CERN sites, this service has been built to cope with the management of all CERN rooms with limited human resources. This has been made possible by the intensive use of professional software to manage and monitor all the room equipment, maintenance and activity. This paper focuses on presenting these packages, either off-the-shelf commercial products (asset and maintenance management tool, remote audio-visual equipment monitoring systems, local automation devices, new generation touch screen interfaces for interacting with the room) when available or locally developed integration and operational layers (generic audio-visual control and monitoring framework) and how they help overcoming the challenges presented by such a service. The aim is to minimise local human interventions while preserving the highest service quality and placing the end user back in the centre of this collaboration platform.

  16. Environmental Management System Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, Robert; Thorson, Patrick; Horst, Blair

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan

  17. The Orbital Maneuvering Vehicle Training Facility visual system concept

    NASA Technical Reports Server (NTRS)

    Williams, Keith

    1989-01-01

    The purpose of the Orbital Maneuvering Vehicle (OMV) Training Facility (OTF) is to provide effective training for OMV pilots. A critical part of the training environment is the Visual System, which will simulate the video scenes produced by the OMV Closed-Circuit Television (CCTV) system. The simulation will include camera models, dynamic target models, moving appendages, and scene degradation due to the compression/decompression of video signal. Video system malfunctions will also be provided to ensure that the pilot is ready to meet all challenges the real-world might provide. One possible visual system configuration for the training facility that will meet existing requirements is described.

  18. ERDA/Lewis research center photovoltaic systems test facility

    NASA Technical Reports Server (NTRS)

    Forestieri, A. F.; Johnson, J. A.; Knapp, W. D.; Rigo, H.; Stover, J.; Suhay, R.

    1977-01-01

    A national photovoltaic power systems test facility (of initial 10-kW peak power rating) is described. It consists of a solar array to generate electrical power, test-hardware for several alternate methods of power conversion, electrical energy storage systems, and an instrumentation and data acquisition system.

  19. Oak Ridge Reservation Waste Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  20. Advanced Group Support Systems and Facilities

    NASA Technical Reports Server (NTRS)

    Noor, Ahmed K. (Compiler); Malone, John B. (Compiler)

    1999-01-01

    The document contains the proceedings of the Workshop on Advanced Group Support Systems and Facilities held at NASA Langley Research Center, Hampton, Virginia, July 19-20, 1999. The workshop was jointly sponsored by the University of Virginia Center for Advanced Computational Technology and NASA. Workshop attendees came from NASA, other government agencies, industry, and universities. The objectives of the workshop were to assess the status of advanced group support systems and to identify the potential of these systems for use in future collaborative distributed design and synthesis environments. The presentations covered the current status and effectiveness of different group support systems.

  1. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  2. San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

    NASA Technical Reports Server (NTRS)

    Werth, L. F. (Principal Investigator)

    1981-01-01

    The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

  3. 49 CFR 191.17 - Transmission systems; gathering systems; and liquefied natural gas facilities: Annual report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... liquefied natural gas facilities: Annual report. 191.17 Section 191.17 Transportation Other Regulations...; gathering systems; and liquefied natural gas facilities: Annual report. (a) Transmission or Gathering. Each..., 2011. (b) LNG. Each operator of a liquefied natural gas facility must submit an annual report for that...

  4. 49 CFR 191.15 - Transmission systems; gathering systems; and liquefied natural gas facilities: Incident report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under § 191.5 of this part. (b) LNG. Each operator of a liquefied natural gas plant or facility must... liquefied natural gas facilities: Incident report. 191.15 Section 191.15 Transportation Other Regulations...; gathering systems; and liquefied natural gas facilities: Incident report. (a) Transmission or Gathering...

  5. Facilities and support systems for a 90-day test of a regenerative life support system

    NASA Technical Reports Server (NTRS)

    Malin, R. L.

    1972-01-01

    A 90-day test is reported of a regenerative life support system which was completed in a space station simulator. The long duration of the test and the fact that it was manned, imposed rigid reliability and safety requirements on the facility. Where adequate reliability could not be built into essential facility systems, either backup systems or components were provided. Awareness was intensified by: (1) placing signs on every piece of equipment that could affect the test, (2) painting switches on all breaker panels a bright contrasting color, (3) restricting access to the test control area, and (4) informing personnel in the facility (other than test personnel) of test activities. It is concluded that the basic facility is satisfactory for conducting long-duration manned tests, and it is recommended that all monitor and alarm functions be integrated into a single operation.

  6. Comparison of the capacity between public and private health facilities to manage under-five children with febrile illnesses in Uganda.

    PubMed

    Buregyeya, Esther; Rutebemberwa, Elizeus; LaRussa, Phillip; Lal, Sham; Clarke, Sîan E; Hansen, Kristian S; Magnussen, Pascal; Mbonye, Anthony K

    2017-05-02

    Public health facilities are usually the first to receive interventions compared to private facilities, yet majority of health seeking care is first done with the latter. This study compared the capacity to manage acute febrile illnesses in children below 5 years in private vs public health facilities in order to design interventions to improve quality of care. A survey was conducted within 57 geographical areas (parishes), from August to October 2014 in Mukono district, central Uganda. The survey comprised both facility and health worker assessment. Data were collected on drug stocks, availability of treatment guidelines, diagnostic equipment, and knowledge in management of malaria, pneumonia and diarrhoea, using a structured questionnaire. A total of 53 public and 241 private health facilities participated in the study. While similar proportions of private and public health facilities stocked Coartem, the first-line anti-malarial drug, (98 vs 95%, p = 0.22), significantly more private than public health facilities stocked quinine (85 vs 53%, p < 0.01). Stocks of obsolete anti-malarial drugs, such as chloroquine, were reported in few public and private facilities (3.7 vs 12.5%, p = 0.06). Stocks of antibiotics-amoxycillin and gentamycin were similar in both sectors (≥90% for amoxicillin; ≥50 for gentamycin). Training in malaria was reported by 65% of public health facilities vs 56% in the private sector, p = 0.25), while, only 21% in the public facility and 12% in the private facilities, p = 0.11, reported receiving training in pneumonia. Only 55% of public facilities had microscopes. Malaria treatment guidelines were significantly lacking in the private sector, p = 0.01. Knowledge about first-line management of uncomplicated malaria, pneumonia and diarrhoea was significantly better in the public facilities compared to the private ones, though still sub-optimal. Deficiencies of equipment, supplies and training exist even in public health

  7. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    DOE-funded research projects that are integrating cybersecurity controls with power systems principles Management, a hardware and software system that mimics the communications, power systems, and cybersecurity

  8. NREL's Energy Systems Integration Supporting Facilities - Continuum

    Science.gov Websites

    Integration Facility opened in December, 2012. Photo by Dennis Schroeder, NREL NREL's Energy Systems capabilities. Photo by Dennis Schroeder, NREL This research electrical distribution bus (REDB) works as a power

  9. Large-Scale Cryogen Systems and Test Facilities

    NASA Technical Reports Server (NTRS)

    Johnson, R. G.; Sass, J. P.; Hatfield, W. H.

    2007-01-01

    NASA has completed initial construction and verification testing of the Integrated Systems Test Facility (ISTF) Cryogenic Testbed. The ISTF is located at Complex 20 at Cape Canaveral Air Force Station, Florida. The remote and secure location is ideally suited for the following functions: (1) development testing of advanced cryogenic component technologies, (2) development testing of concepts and processes for entire ground support systems designed for servicing large launch vehicles, and (3) commercial sector testing of cryogenic- and energy-related products and systems. The ISTF Cryogenic Testbed consists of modular fluid distribution piping and storage tanks for liquid oxygen/nitrogen (56,000 gal) and liquid hydrogen (66,000 gal). Storage tanks for liquid methane (41,000 gal) and Rocket Propellant 1 (37,000 gal) are also specified for the facility. A state-of-the-art blast proof test command and control center provides capability for remote operation, video surveillance, and data recording for all test areas.

  10. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal agencies...

  11. The prevention of mother-to-child transmission of HIV cascade analysis tool: supporting health managers to improve facility-level service delivery.

    PubMed

    Gimbel, Sarah; Voss, Joachim; Mercer, Mary Anne; Zierler, Brenda; Gloyd, Stephen; Coutinho, Maria de Joana; Floriano, Florencia; Cuembelo, Maria de Fatima; Einberg, Jennifer; Sherr, Kenneth

    2014-10-21

    The objective of the prevention of Mother-to-Child Transmission (pMTCT) cascade analysis tool is to provide frontline health managers at the facility level with the means to rapidly, independently and quantitatively track patient flows through the pMTCT cascade, and readily identify priority areas for clinic-level improvement interventions. Over a period of six months, five experienced maternal-child health managers and researchers iteratively adapted and tested this systems analysis tool for pMTCT services. They prioritized components of the pMTCT cascade for inclusion, disseminated multiple versions to 27 health managers and piloted it in five facilities. Process mapping techniques were used to chart PMTCT cascade steps in these five facilities, to document antenatal care attendance, HIV testing and counseling, provision of prophylactic anti-retrovirals, safe delivery, safe infant feeding, infant follow-up including HIV testing, and family planning, in order to obtain site-specific knowledge of service delivery. Seven pMTCT cascade steps were included in the Excel-based final tool. Prevalence calculations were incorporated as sub-headings under relevant steps. Cells not requiring data inputs were locked, wording was simplified and stepwise drop-offs and maximization functions were included at key steps along the cascade. While the drop off function allows health workers to rapidly assess how many patients were lost at each step, the maximization function details the additional people served if only one step improves to 100% capacity while others stay constant. Our experience suggests that adaptation of a cascade analysis tool for facility-level pMTCT services is feasible and appropriate as a starting point for discussions of where to implement improvement strategies. The resulting tool facilitates the engagement of frontline health workers and managers who fill out, interpret, apply the tool, and then follow up with quality improvement activities. Research on

  12. Management of radioactive material safety programs at medical facilities. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, L.W.; Schlueter, J.; Woods, S.

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized usersmore » and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.« less

  13. A Statewide Management Information System for the Control of Sexually Transmitted Diseases

    PubMed Central

    Fichtner, Ronald R.; Blount, Joseph H.; Spencer, Jack N.

    1983-01-01

    The persistent endemicity in the U.S. of infectious syphilis and gonorrhea, together with increasing diagnoses of gonococcal-related pelvic inflammatory disease in women and genital herpes infections, have intensified pressures on state and local VD control programs to measure, analyze, and interpret the distribution and transmission of these and other sexually transmitted diseases. In response, the Division of Venereal Disease Control (DVDC) of the Centers for Disease Control (CDC) is participating in the development of three state-wide, prototype sexually transmitted disease (STD) management information systems. A systems analysis of a typical state-wide STD control program indicated that timely, comprehensive, informational support to public health managers and policy makers should be combined with rapid, direct support of program activities using an on-line, integrated data base, computer system with telecommunications capability. This methodology uses a data base management system, query facility for ad hoc inquiries, custom design philosophies, but utilizes distinct hardware and software implementations.

  14. National information network and database system of hazardous waste management in China

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma Hongchang

    1996-12-31

    Industries in China generate large volumes of hazardous waste, which makes it essential for the nation to pay more attention to hazardous waste management. National laws and regulations, waste surveys, and manifest tracking and permission systems have been initiated. Some centralized hazardous waste disposal facilities are under construction. China`s National Environmental Protection Agency (NEPA) has also obtained valuable information on hazardous waste management from developed countries. To effectively share this information with local environmental protection bureaus, NEPA developed a national information network and database system for hazardous waste management. This information network will have such functions as information collection, inquiry,more » and connection. The long-term objective is to establish and develop a national and local hazardous waste management information network. This network will significantly help decision makers and researchers because it will be easy to obtain information (e.g., experiences of developed countries in hazardous waste management) to enhance hazardous waste management in China. The information network consists of five parts: technology consulting, import-export management, regulation inquiry, waste survey, and literature inquiry.« less

  15. Newly emerging resource efficiency manager programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolf, S.; Howell, C.

    1997-12-31

    Many facilities in the northwest such as K--12 schools, community colleges, and military installations are implementing resource-efficiency awareness programs. These programs are generally referred to as resource efficiency manager (REM) or resource conservation manager (RCM) programs. Resource efficiency management is a systems approach to managing a facility`s energy, water, and solid waste. Its aim is to reduce utility budgets by focusing on behavioral changes, maintenance and operation procedures, resource accounting, education and training, and a comprehensive awareness campaign that involves everyone in the organization.

  16. Transportation informatics : an image analysis system for managing transportation facilities - phase II.

    DOT National Transportation Integrated Search

    2012-02-01

    One of the most important tasks in maintaining transportation facilities such as highways : and streets is the evaluation of the existing condition. Visual evaluation by human : inspectors is subjective in nature, therefore has issues of consistency ...

  17. Hanford Facility Annual Dangerous Waste Report Calendar Year 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FREEMAN, D.A.

    2003-02-01

    Hanford CY 2002 dangerous waste generation and management forms. The Hanford Facility Annual Dangerous Waste Report (ADWR) is prepared to meet the requirements of Washington Administrative Code Sections 173-303-220, Generator Reporting, and 173-303-390, Facility Reporting. In addition, the ADWR is required to meet Hanford Facility RCRA Permit Condition I.E.22, Annual Reporting. The ADWR provides summary information on dangerous waste generation and management activities for the Calendar Year for the Hanford Facility EPA ID number assigned to the Department of Energy for RCRA regulated waste, as well as Washington State only designated waste and radioactive mixed waste. The Solid Waste Informationmore » and Tracking System (SWITS) database is utilized to collect and compile the large array of data needed for preparation of this report. Information includes details of waste generated on the Hanford Facility, waste generated offsite and sent to Hanford for management, and other waste management activities conducted at Hanford, including treatment, storage, and disposal. Report details consist of waste descriptions and weights, waste codes and designations, and waste handling codes. In addition, for waste shipped to Hanford for treatment and/or disposal, information on manifest numbers, the waste transporter, the waste receiving facility, and the original waste generators are included. In addition to paper copies, electronic copies of the report are also transmitted to the regulatory agency.« less

  18. Proposed Facility Modifications to Support Propulsion Systems Testing Under Simulated Space Conditions at Plum Brook Station's Spacecraft Propulsion Research Facility (B-2)

    NASA Technical Reports Server (NTRS)

    Edwards, Daryl A.

    2008-01-01

    Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2's support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed in the early 1960s to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Exhaust system performance, including understanding the present facility capabilities, is the primary focus of this work. A variety of approaches and analytical tools are being employed to gain this understanding. This presentation discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.

  19. National remote computational flight research facility

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.

    1989-01-01

    The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.

  20. Building Management Policy and Procedures for Emergency Preparedness and Facility Coordination for the Ernest Orlando Lawrence Berkeley National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EHS Staff

    2003-04-01

    To ensure efficient and effective management of LBNL facilities, LBNL shall assign line managers to perform appropriate work functions. LBNL divisions that are delegated responsibility for the management of buildings shall designate division personnel to serve as --''Building Managers.''