Sample records for facilities planning office

  1. Guidelines for Analysis of Health Facilities Planning in Developing Countries. Volume 5: Health Facilities Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Porter, Dennis R.; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this fifth of ten manuals in the International Health Planning Methods Series deals with health facilities planning in developing countries. While several specific…

  2. Modeling the Office of Science Ten Year Facilities Plan: The PERI Architecture Team

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    de Supinski, Bronis R.; Alam, Sadaf R; Bailey, David

    2009-01-01

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance ofmore » these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfilll our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.« less

  3. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  4. Modeling the Office of Science Ten Year FacilitiesPlan: The PERI Architecture Tiger Team

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    de Supinski, B R; Alam, S R; Bailey, D H

    2009-05-27

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort to the optimization of key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measuredmore » the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.« less

  5. Modeling the Office of Science Ten Year Facilities Plan: The PERI Architecture Tiger Team

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    de Supinski, Bronis R.; Alam, Sadaf; Bailey, David H.

    2009-06-26

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance ofmore » these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.« less

  6. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, Juan; Anderson, Art

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less

  7. 27 CFR 24.41 - Office facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Office facilities. 24.41... § 24.41 Office facilities. The appropriate TTB officer may require the proprietor to furnish... performing Government duties whether or not such office space is located at the specific premises where...

  8. A terrorism response plan for hospital security and safety officers.

    PubMed

    White, Donald E

    2002-01-01

    Security and Safety managers in today's healthcare facilities need to factor terrorism response into their emergency management plans, separate from the customary disaster plans and the comparatively recent security plans. Terrorism incidents will likely be security occurrences that use a weapon of mass destruction to magnify the incidents into disasters. Facility Y2K Plans can provide an excellent framework for the detailed contingency planning needed for terrorism response by healthcare facilities. Tabbed binder notebooks, with bulleted procedures and contact points for each functional section, can provide security and safety officers with at-a-glance instructions for quick 24/7 implementation. Each functional section should focus upon what activities or severity levels trigger activation of the backup processes. Network with your countywide, regional, and/or state organizations to learn what your peers are doing. Comprehensively inventory your state, local, and commercial resources so that you have alternate providers readily available 24/7 to assist your facility upon disasters.

  9. 27 CFR 19.279 - Office facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Office facilities. 19.279... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Construction, Equipment and Security § 19.279 Office... plant to supervise operations, the proprietor shall provide an office at the distilled spirits plant for...

  10. 38 CFR 14.635 - Office space and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Office space and... Practice and Information Concerning Fees, 38 U.s.c. 5901-5905 § 14.635 Office space and facilities. The Secretary may furnish office space and facilities, if available, in buildings owned or occupied by the...

  11. 38 CFR 14.635 - Office space and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Office space and... Practice and Information Concerning Fees, 38 U.s.c. 5901-5905 § 14.635 Office space and facilities. The Secretary may furnish office space and facilities, if available, in buildings owned or occupied by the...

  12. 38 CFR 14.635 - Office space and facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2014-07-01 2014-07-01 false Office space and... Practice and Information Concerning Fees, 38 U.s.c. 5901-5905 § 14.635 Office space and facilities. The Secretary may furnish office space and facilities, if available, in buildings owned or occupied by the...

  13. 38 CFR 14.635 - Office space and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2012-07-01 2012-07-01 false Office space and... Practice and Information Concerning Fees, 38 U.s.c. 5901-5905 § 14.635 Office space and facilities. The Secretary may furnish office space and facilities, if available, in buildings owned or occupied by the...

  14. 38 CFR 14.635 - Office space and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Office space and... Practice and Information Concerning Fees, 38 U.s.c. 5901-5905 § 14.635 Office space and facilities. The Secretary may furnish office space and facilities, if available, in buildings owned or occupied by the...

  15. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  16. Planning for Office Automation.

    ERIC Educational Resources Information Center

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  17. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  18. 77 FR 63849 - Facility Security Officer Training Requirements; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard [Docket No. USCG-2012-0908] Facility Security Officer Training Requirements; Correction AGENCY: Coast Guard, DHS. ACTION: Notice of public meeting; request for... comments on the development of a Facility Security Officer training program. The notice contains an...

  19. 12 CFR 160.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 1 2012-01-01 2012-01-01 false Real estate for office and related facilities... LENDING AND INVESTMENT § 160.37 Real estate for office and related facilities. A Federal savings association may invest in real estate (improved or unimproved) to be used for office and related facilities of...

  20. 12 CFR 160.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 1 2014-01-01 2014-01-01 false Real estate for office and related facilities... LENDING AND INVESTMENT § 160.37 Real estate for office and related facilities. A Federal savings association may invest in real estate (improved or unimproved) to be used for office and related facilities of...

  1. 12 CFR 160.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 1 2013-01-01 2013-01-01 false Real estate for office and related facilities... LENDING AND INVESTMENT § 160.37 Real estate for office and related facilities. A Federal savings association may invest in real estate (improved or unimproved) to be used for office and related facilities of...

  2. 77 FR 33788 - Proposed Post Office Structure Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...

  3. LPT. Shield test facility (TAN645 and 646). Floor plan and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645 and -646). Floor plan and room names. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-1. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107347 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  4. The New Planned Giving Officer.

    ERIC Educational Resources Information Center

    Jordan, Ronald R.; Quynn, Katelyn L.

    1994-01-01

    A planned giving officer is seen as an asset to college/university development for technical expertise, credibility, and connections. Attorneys, certified public accountants, bank trust officers, financial planners, investment advisers, life insurance agents, and real estate brokers may be qualified but probably also need training. (MSE)

  5. 47 CFR 4.5 - Definitions of outage, special offices and facilities, and 911 special facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, and 911 special facilities. 4.5 Section 4.5 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Definitions of outage, special offices and facilities, and 911 special facilities. (a) Outage is defined as a... government facilities.” 911 special facilities are addressed separately in paragraph (e) of this section. (c...

  6. The Educator's "Action" Office.

    ERIC Educational Resources Information Center

    Martin, Dikran J.

    Design criteria, standards, and human factors related to designing and planning flexible and efficient work environments for college faculty members are overviewed with six model (example) office plans included. The physical and psychological design needs in such an office facility are given, with task performance data on student faculty…

  7. 24 CFR 791.404 - Field Office allocation planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Field Office allocation planning... Allocation of Budget Authority for Housing Assistance § 791.404 Field Office allocation planning. (a) General objective. The allocation planning process should provide for the equitable distribution of available budget...

  8. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  9. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified

  10. Planning and Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.

    Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…

  11. 77 FR 75676 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... Review of a License Application for a Fuel Cycle Facility.'' The NRC is extending the public comment... of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2012...

  12. 12 CFR 560.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 6 2014-01-01 2012-01-01 true Real estate for office and related facilities... LENDING AND INVESTMENT Lending and Investment Powers for Federal Savings Associations § 560.37 Real estate for office and related facilities. A federal savings association may invest in real estate (improved...

  13. 12 CFR 560.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Real estate for office and related facilities... LENDING AND INVESTMENT Lending and Investment Powers for Federal Savings Associations § 560.37 Real estate for office and related facilities. A federal savings association may invest in real estate (improved...

  14. 12 CFR 560.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 6 2013-01-01 2012-01-01 true Real estate for office and related facilities... LENDING AND INVESTMENT Lending and Investment Powers for Federal Savings Associations § 560.37 Real estate for office and related facilities. A federal savings association may invest in real estate (improved...

  15. 12 CFR 560.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 6 2012-01-01 2012-01-01 false Real estate for office and related facilities... LENDING AND INVESTMENT Lending and Investment Powers for Federal Savings Associations § 560.37 Real estate for office and related facilities. A federal savings association may invest in real estate (improved...

  16. Integrated Facilities and Infrastructure Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reisz Westlund, Jennifer Jill

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less

  17. 5. Photographic copy of architectural floor plans for Officers' Quarters ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of architectural floor plans for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Floor Plan, Foundation Plan & Details, Sheet No. 12 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA

  18. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  19. Training Plans for Cooperative Office Education: A Guide.

    ERIC Educational Resources Information Center

    Virginia State Dept. of Education, Richmond. Business Education Service.

    The guide for coordinators of cooperative office education in Virginia, the work of 138 coordinators participating in 36 in-service workshops, describes specific steps for developing and using training plans in cooperative office education. Five short chapters discuss the what and why of training plans, development and use of model training…

  20. Earth integrated design: office dormitory facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H. B.; Barnes, P. R.

    1980-01-01

    The generation process of the design of the Joint Institute for Heavy Ion Research is described. Architectural and energy considerations are discussed. The facility will contain living quarters for guest scientists who come to Oak Ridge to conduct short experiments and sleeping alcoves for local researchers on long experimental shifts as well as office space. (MHR)

  1. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The Office of Financial Management, Planning and Evaluation is responsible for developing the Commission's...

  2. 7. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF OFFICE, SHEET 1 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF OFFICE, SHEET 1 OF 1, 8' X 10' NEGATIVE MADE FROM COPIES OF ORIGINAL PLANS, MAY 21, 1913; WALLOWA-WHITMAN NATIONAL FOREST SUPERVISOR'S OFFICE, BAKER CITY, OREGON - Wallowa Ranger Station, Office, 602 First Street, Wallowa, Wallowa County, OR

  3. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  4. The influence of financial officers on the decision-making process in health facilities: a study in Ankara.

    PubMed

    Kisa, Adnan; Kavuncubasi, Sahin; Ersoy, Korkut

    2006-01-01

    Financial officers in health facilities currently face 2 main duties. The first is to help the management team in the decision-making process and the second is to ensure the integrity of financial reports to outsiders and outside agencies. A roster of 191 private outpatient clinics in Ankara was drawn up. Fourteen private hospitals and 66 private clinics were included in the study via systematic sampling. Financial officers' perceptions of involvement in 46 decisions (grouped as strategic decisions, accounting and assessment, and nonfinancial decisions) were gauged using a responsive scale ranging from 1 (no involvement) to 5 (greatly involved). Involvement was defined as the extent of participation in specific decision-making issues. High involvement is assumed to be tantamount to influence and can be visualized in the extent to which financial officers could challenge plans, recommend or disapprove, or take a very significant role in reaching decisions. The results of the study show that in the dynamic environment in which health facilities operate, the financial officer's role is somewhat equivocal. The study suggests that the power and influence of financial officers should be defined in such a way so as to develop a clear role for these members of the management team.

  5. Cost-Benefit Analysis of the Officer Career Information and Planning System

    DTIC Science & Technology

    1980-08-01

    information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A

  6. Effects of acoustic environment on work in private office rooms and open-plan offices - longitudinal study during relocation.

    PubMed

    Kaarlela-Tuomaala, A; Helenius, R; Keskinen, E; Hongisto, V

    2009-11-01

    The aim was to determine how the perceived work environment, especially acoustic environment, and its effects differed in private office rooms and in open-plan offices. The subjects consisted of 31 workers who moved from private office rooms to open-plan offices and who answered the questionnaire before and after the relocation. Private office rooms were occupied only by one person while open-plan offices were occupied by more than 20 persons. Room acoustical descriptors showed a significant reduction in speech privacy after relocation. The noise level averaged over the whole work day did not change but the variability of noise level reduced significantly. Negative effects of acoustic environment increased significantly, including increased distraction, reduced privacy, increased concentration difficulties and increased use of coping strategies. Self-rated loss of work performance because of noise doubled. Cognitively demanding work and phone conversations were most distracted by noise. The benefits that are often associated with open-plan offices did not appear: cooperation became less pleasant and direct and information flow did not change. Nowadays, most office workers, independent of job type, are located in open-plan offices without the individual needs of privacy, concentration and interaction being analysed. This intervention study consisted of professional workers. Their work tasks mainly required individual efforts, and interaction between other workers was not of primary concern, although necessary. The results suggest that the open-plan office is not recommended for professional workers. Similar intervention studies should also be made for other job types.

  7. Office of General Counsel Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    20503. IRT DATE 3. REPORT TYPE AND DATES COVERED y 1989 5. FUNDING NUMBERS Office of General Counsel Total Quality Management Plan 6. AUTHOR(S) 7...of General Counsel. - r DTIC 65 LE- E CTEn’" SEP291 989 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Office of General...89) Pra-ifcr~bed ANSI Sid 139-1S ""-"’- ", ~ mmmmmu10n S S OFFICE OF GENERAL COUNSEL TOTAL QUALITY MANAGEMENT PLAN Acc’, ’ 7or. .?:" t ’_7 Codes K 89

  8. Planning and the School Business Office.

    ERIC Educational Resources Information Center

    Johnston, A. P.; Hood, Kenneth

    This chapter of "Principles of School Business Management" focuses on issues and organizational realities that affect the planning conducted by school business offices. The chapter deals first with theories of planning and then considers their relationship to the organizational context in which they will be implemented. Among the theories reviewed…

  9. State Law Approaches to Facility Regulation of Abortion and Other Office Interventions

    PubMed Central

    Daniel, Sara; Cloud, Lindsay K.

    2018-01-01

    Objectives. To compare the prevalence and characteristics of facility laws governing abortion provision specifically (targeted regulation of abortion providers [TRAP] laws); office-based surgeries, procedures, sedation or anesthesia (office interventions) generally (OBS laws); and other procedures specifically. Methods. We conducted cross-sectional legal assessments of state facility laws for office interventions in effect as of August 1, 2016. We coded characteristics for each law and compared characteristics across categories of laws. Results. TRAP laws (n = 55; in 34 states) were more prevalent than OBS laws (n = 25; in 25 states) or laws targeting other procedures (n = 1; in 1 state). TRAP laws often regulated facilities that would not be regulated under OBS laws (e.g., all TRAP laws, but only 2 OBS laws, applied regardless of sedation or anesthesia used). TRAP laws imposed more numerous and more stringent requirements than OBS laws. Conclusions. Many states regulate abortion-providing facilities differently, and more stringently, than facilities providing other office interventions. The Supreme Court’s 2016 decision in Whole Woman’s Health v Hellerstedt casts doubt on the legitimacy of that differential treatment. PMID:29470114

  10. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  11. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  12. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  13. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  14. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  15. Office of Science User Facilities Summary Report, Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-01-01

    The U.S. Department of Energy Office of Science provides the Nation’s researchers with worldclass scientific user facilities to propel the U.S. to the forefront of science and innovation. A user facility is a federally sponsored research facility available for external use to advance scientific or technical knowledge under the following conditions: open, accessible, free, collaborative, competitive, and unique.

  16. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  17. 33 CFR 105.205 - Facility Security Officer (FSO).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... training in the following, as appropriate: (i) Relevant international laws and codes, and recommendations... well as any plans to change the facility or facility infrastructure prior to amending the FSP; and (18...

  18. College of the Sequoias Faculty Attitudes Toward Office Hours and Facilities.

    ERIC Educational Resources Information Center

    McCormick, Anne

    The opinions of the faculty at the College of the Sequoias, California, regarding their office facilities and scheduled office hours were surveyed. Ninety-nine faculty members completed a 10-item questionnaire, which is enclosed. It was found that the maintenance of faculty office hours and being available for students was viewed as an important…

  19. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  20. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  1. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  2. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  3. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  4. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  5. School Nutrition Facility Planning Guide.

    ERIC Educational Resources Information Center

    Pannell, Dorothy VanEgmond

    This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…

  6. 76 FR 38672 - Redelegation of Authority to the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... the Office of Strategic Planning and Management AGENCY: Office of the Chief Operating Officer, HUD... HUD (COO) redelegates to the Director, Office of Strategic Planning and Management, authority and... 22, 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and...

  7. 3. Photographic copy of architectural site plans for Officers' Quarters ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photographic copy of architectural site plans for Officers' Quarters "A" & "B" and Warehouses "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Location Plan, Grading & Paving, Sheet No. 2 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA

  8. Fire Officer I Lesson Plans.

    ERIC Educational Resources Information Center

    Pribyl, Paul F.

    Lesson plans are provided for the Fire Officer I course. Material for each lesson is presented in this format: course title, lesson title, equipment required, training aids needed, and a content outline which details teaching points and related instructor references. These references, or suggested readings, are listed at the conclusion of each…

  9. Interactive Querying Techniques for an Office Filing Facility.

    ERIC Educational Resources Information Center

    Morrissey, J. M.; And Others

    1986-01-01

    Proposes a "Model of Querying" for users of office filing facilities and discusses its motivation, aspects, attributes, and advantages. A review of current information systems and attempts to combine information retrieval, artificial intelligence, and database management techniques leads to conclusion that no resultant system is adequate…

  10. Office of Aviation Medicine Strategic Plan

    DOT National Transportation Integrated Search

    1992-02-01

    This was the first strategic plan for the Office of Aviation Medicine (AAM). : The AAM is a geographically and functionally diverse organization that provides : a wide range of aviation medical services to the FAA and the national and : international...

  11. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  12. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  13. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  14. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  15. 12 CFR 560.37 - Real estate for office and related facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Real estate for office and related facilities. 560.37 Section 560.37 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY LENDING AND INVESTMENT Lending and Investment Powers for Federal Savings Associations § 560.37 Real estate...

  16. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  17. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less

  18. Federal Facilities Programs.

    ERIC Educational Resources Information Center

    Chase, William W.

    Brief descriptions are presented of a number of Office of Education federal funding programs directly supporting educational facilities planning and construction. Programs now in operation and several currently under consideration are pointed out. Consideration is also given to several programs in federal agencies other than the Office of…

  19. Planning Requirements for Small School Facilities.

    ERIC Educational Resources Information Center

    Davis, J. Clark; McQueen, Robert

    The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…

  20. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; analysis of major policy and operational issues; performing evaluations and management studies of... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The...

  1. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  2. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  3. Planning and Designing Safe Facilities

    ERIC Educational Resources Information Center

    Seidler, Todd

    2006-01-01

    Those who manage physical education, athletic, and recreation programs have a number of legal duties that they are expected to carry out. Among these are an obligation to take reasonable precautions to ensure safe programs and facilities for all participants, spectators, and staff. Physical education and sports facilities that are poorly planned,…

  4. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  5. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  6. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  7. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 2 2011-10-01 2011-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  8. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  9. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 2 2012-10-01 2012-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  10. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  11. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 2 2014-10-01 2012-10-01 true State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  12. Photographic copy of floor plans for Bachelor Officers' Quarters (Tl) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plans for Bachelor Officers' Quarters (T-l) known as the "Desert Rat Hotel" in the early days of the Muroc Flight Test Base (North Base). The plans show the layout of quarters, lavatories, mess as well as, the cooling system installation. Contract W-509-Eng 2937, Military Construction; Muroc Bombing Range, Muroc Lake, Calif; Materiel Test Site, Officers Quarters, Evaporative Coolers, Sheet 5 of 11, May 1942. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Bachelor Officers' Quarters T-1, Second & C Streets, Boron, Kern County, CA

  13. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  14. New Trends in Facility Asset Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2000-01-01

    Explains new, positive trends in facility asset management that encompasses greater acceptance and involvement of facility managers in the financial planning process, greater awareness of the need for maintenance, and facility administrators taking a greater role with business officers. The new climate for alternative renewal financing proposals…

  15. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    PubMed

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  16. Photographic copy of floor plan, undated, Civil Engineers Office, in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI

  17. Surface-Water Quality-Assurance Plan for the Tallahassee Office, U.S. Geological Survey

    USGS Publications Warehouse

    Tomlinson, Stewart A.

    2006-01-01

    This Tallahassee Office Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the Tallahassee Office for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all Tallahassee Office personnel involved in surface-water data activities, and changes as the needs and requirements of the Tallahassee Office, Florida Integrated Science Center, and Water Discipline change. Reg-ular updates to this Plan represent an integral part of the quality-assurance process. In the Tallahassee Office, direct oversight and responsibility by the employee(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure high-quality data, analyses, reviews, and reports for cooperating agencies and the public.

  18. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  19. Facility Planning for Physical Education, Recreation, and Athletics.

    ERIC Educational Resources Information Center

    Flynn, Richard B., Ed.

    This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…

  20. Planning Physical Education and Athletic Facilities in Schools.

    ERIC Educational Resources Information Center

    Penman, Kenneth A.

    This book is primarily designed for a course in planning physical education and athletic facilities and as a supplementary textbook for administration courses. It illustrates the skills necessary for designing and planning facilities, stresses the need for effective communication between planners and users, and covers elementary through college…

  1. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), U.S. Engineer Office, New York District, Harbor Defenses of New York Mine Boathouse, location plan and elevations, Fort Hancock, New Jersey, July 1943 Detail of western docking structure - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  2. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  3. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  4. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  5. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  6. Frontiers in Learning. The Association of Higher Education Facilities Officers Educational Conference and Annual Meeting Proceedings (83rd, Salt Lake City, Utah, July 21-23, 1996).

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    These 25 papers from a conference of higher education facilities offices are grouped into 5 categories: business management; energy and environment; human resources; operations and maintenance; and planning, design and construction. Papers are: (1) "Provider of Choice" (Jerry C. Black); (2) "Re-Engineering--'Inside-Inside' or Outside-Inside': A…

  7. Effect of noise on comfort in open-plan offices: application of an assessment questionnaire.

    PubMed

    Perrin Jegen, N; Chevret, P

    2017-01-01

    Open-plan offices account for 60% of French office workspaces. The noise levels recorded in this type of environment are much lower than those encountered in industrial workplaces. Nevertheless, surveys show that noise is considered by employees as the main source of discomfort. A first questionnaire dedicated to noise discomfort was produced in 2013 and tested on a panel made up of 217 people working in 7 French companies. Today, it also makes it possible to address the issues of fatigue related to ambient sound, but above all, the survey aims to study the differences in how ambient noise is perceived depending on the type of open-plan office. On the basis of that new version, a second survey has been conducted in 23 open-plan offices, making it possible to collect the responses from 617 employees. Most of the results of the first survey have been confirmed, with an increase in the significance of the statistical analyses. Moreover, French Standard NF S 31-199, which is currently being drafted, establishes a typology of open-plan office spaces according to the types of work done in them. Based on this typology, it appears that when dealing with the impact on noise on workers, a distinction has to be made between the types of open plan offices. Practitioner Summary: Surveys conducted in open-plan offices show that noise is considered by employees as the main source of discomfort even if the noise recorded in this type of environment is not hazardous. This work presents the result of a large survey dedicated to noise discomfort conducted in 23 open-plan offices.

  8. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  9. PERT Planning for Physical Educational Facilities.

    ERIC Educational Resources Information Center

    Moriarty, R. J.

    1973-01-01

    Because of the high degree of interest in education and physical education in Canada, there has been a phenomenal growth in physical education facilities. Physical educators must become facility specialists in order to contribute to the planning, procurement, and utilization of the new complexes that are being developed. Among the most difficult…

  10. PLANNING THE INDOOR PHYSICAL EDUCATION FACILITIES.

    ERIC Educational Resources Information Center

    HASE, GERALD J.; HICK, BASIL L.

    THIS PAMPHLET IS DESIGNED TO HELP ARCHITECTS AND LOCAL SCHOOL OFFICIALS IN THE PREPARATION OF PLANS FOR PHYSICAL EDUCATION FACILITIES IN NEW AND EXISTING BUILDINGS. FACILITIES MENTIONED INCLUDE--(1) GYMNASIUM, (2) SWIMMING POOL, (3) SMALL GROUP ACTIVITY ROOM, (4) DRESSING AND SHOWERING ROOMS, (5) TEAM ROOM, (6) EQUIPMENT DRYING ROOM, (7) LAUNDRY…

  11. 77 FR 31974 - Order of Succession for the Office of Community Planning and Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5642-D-02] Order of Succession for the Office of Community Planning and Development AGENCY: Office of the Secretary, HUD. ACTION: Notice of Order of Succession for the Office of Community Planning and Development. SUMMARY: In this notice, the...

  12. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES FOR CENTRAL SCHOOLS. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES, NO. 10.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    PLANNING OUTDOOR PHYSICAL EDUCATION FACILITIES FOR THE CENTRAL SCHOOL SERVING PUPILS FROM KINDERGARTEN THROUGH HIGH SCHOOL SHOULD TAKE INTO ACCOUNT THE NEEDS AND INTERESTS OF ALL PUPILS DURING THE SCHOOL YEAR AND SHOULD PROVIDE FOR RECREATION NEEDS DURING VACATION PERIODS. PROVISION FOR RECREATIONAL FACILITIES FOR ADULTS SHOULD ALSO BE MADE. THE…

  13. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. 42 CFR 71.47 - Special provisions relating to airports: Office and isolation facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Special provisions relating to airports: Office and isolation facilities. 71.47 Section 71.47 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... facilities. Each U.S. airport which receives international traffic shall provide without cost to the...

  15. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  16. JESS facility modification and environmental/power plans

    NASA Technical Reports Server (NTRS)

    Bordeaux, T. A.

    1984-01-01

    Preliminary plans for facility modifications and environmental/power systems for the JESS (Joint Exercise Support System) computer laboratory and Freedom Hall are presented. Blueprints are provided for each of the facilities and an estimate of the air conditioning requirements is given.

  17. Career Planning Modules for the Officer Career Information and Planning System.

    ERIC Educational Resources Information Center

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  18. Planning for Future Forms of Education: Towards an Educational and Educational Facilities Planning Model.

    ERIC Educational Resources Information Center

    Leu, Donald J.

    The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…

  19. Guidelines for Planning in Colleges and Universities. Volume 4: Physical Plant Planning, Facilities Studies.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…

  20. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  1. Computer-Assisted School Facility Planning with ONPASS.

    ERIC Educational Resources Information Center

    Urban Decision Systems, Inc., Los Angeles, CA.

    The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…

  2. D-Side: A Facility and Workforce Planning Group Multi-criteria Decision Support System for Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tavana, Madjid

    2005-01-01

    "To understand and protect our home planet, to explore the universe and search for life, and to inspire the next generation of explorers" is NASA's mission. The Systems Management Office at Johnson Space Center (JSC) is searching for methods to effectively manage the Center's resources to meet NASA's mission. D-Side is a group multi-criteria decision support system (GMDSS) developed to support facility decisions at JSC. D-Side uses a series of sequential and structured processes to plot facilities in a three-dimensional (3-D) graph on the basis of each facility alignment with NASA's mission and goals, the extent to which other facilities are dependent on the facility, and the dollar value of capital investments that have been postponed at the facility relative to the facility replacement value. A similarity factor rank orders facilities based on their Euclidean distance from Ideal and Nadir points. These similarity factors are then used to allocate capital improvement resources across facilities. We also present a parallel model that can be used to support decisions concerning allocation of human resources investments across workforce units. Finally, we present results from a pilot study where 12 experienced facility managers from NASA used D-Side and the organization's current approach to rank order and allocate funds for capital improvement across 20 facilities. Users evaluated D-Side favorably in terms of ease of use, the quality of the decision-making process, decision quality, and overall value-added. Their evaluations of D-Side were significantly more favorable than their evaluations of the current approach. Keywords: NASA, Multi-Criteria Decision Making, Decision Support System, AHP, Euclidean Distance, 3-D Modeling, Facility Planning, Workforce Planning.

  3. 11 CFR 100.56 - Office building or facility for national party committees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... national party committees. A gift, subscription, loan, advance, or deposit of money or anything of value to a national party committee for the purchase or construction of an office building or facility is a...

  4. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    ERIC Educational Resources Information Center

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  5. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...

  6. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. 76 FR 64364 - Order of Succession for the Office of Community Planning and Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5556-D-02] Order of Succession for the Office of Community Planning and Development AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice of Order of Succession. SUMMARY: In this notice, the...

  8. [Acoustic conditions in open plan offices - Pilot test results].

    PubMed

    Mikulski, Witold

    The main source of noise in open plan office are conversations. Office work standards in such premises are attained by applying specific acoustic adaptation. This article presents the results of pilot tests and acoustic evaluation of open space rooms. Acoustic properties of 6 open plan office rooms were the subject of the tests. Evaluation parameters, measurement methods and criterial values were adopted according to the following standards: PN-EN ISO 3382- 3:2012, PN-EN ISO 3382-2:2010, PN-B-02151-4:2015-06 and PN-B-02151-3:2015-10. The reverberation time was 0.33- 0.55 s (maximum permissible value in offices - 0.6 s; the criterion was met), sound absorption coefficient in relation to 1 m2 of the room's plan was 0.77-1.58 m2 (minimum permissible value - 1.1 m2; 2 out of 6 rooms met the criterion), distraction distance was 8.5-14 m (maximum permissible value - 5 m; none of the rooms met the criterion), A-weighted sound pressure level of speech at a distance of 4 m was 43.8-54.7 dB (maximum permissible value - 48 dB; 2 out of 6 rooms met the criterion), spatial decay rate of the speech was 1.8-6.3 dB (minimum permissible value - 7 dB; none of the rooms met the criterion). Standard acoustic treatment, containing sound absorbing suspended ceiling, sound absorbing materials on the walls, carpet flooring and sound absorbing workplace barriers, is not sufficient. These rooms require specific advanced acoustic solutions. Med Pr 2016;67(5):653-662. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  9. National facilities study. Volume 2A: Facility Study Office on the National Wind Tunnel Complex

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Facility Study Office (FSO) has completed its assigned activities. The results of the FSO efforts, studies, and assessments are documented. An overview of the FSO activities as well as a general comparison of all concepts considered are provided. Detailed information is also provided for the selected concept, Concept D-Option 5. Only findings are presented. The FSO developed recommendations only as a consequence of assumptions for cost and schedule assessments.

  10. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  11. Air Force Officer Accession Planning: Addressing Key Gaps in Meeting Career Field Academic Degree Requirements for Nonrated Officers

    DTIC Science & Technology

    2016-06-09

    C O R P O R A T I O N Research Report Air Force Officer Accession Planning Addressing Key Gaps in Meeting Career Field Academic Degree Requirements...various Air Force missions in particular career fields. Key to this goal for nonrated officers is establishing and enforcing academic degree...35 Developing Accession Targets by Academic Degree Type

  12. A Guide for Planning Indoor Facilities for College Physical Education.

    ERIC Educational Resources Information Center

    Crawford, Wayne H.

    Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…

  13. Space Guidelines for Planning Educational Facilities. Planning for Education.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    In 1983 the Oklahoma Legislature adopted facility guidelines for the purpose of defining, organizing, and encouraging the planning of adequate environments for education. The guidelines contained in this booklet have been designed to allow for the requirements of all Oklahoma school districts regardless of size or educational program. The…

  14. Space Planning for Laboratory Buildings | Climate Neutral Research Campuses

    Science.gov Websites

    facilities such as warehouses, offices, and high-tech laboratories have very different energy requirements , and a successful climate action plan will set aside adequate space for different activities. The Facility offices are housed in a different portion of the building than labs, resulting in lower cost

  15. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  16. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  17. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  18. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  19. 33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-190. MOBILIZATION BUILDINGS; STANDARD DETAILS; SMOKE PIPE & FLUE DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  20. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  1. Suggestions for Strategic Planning for the Office of Nonproliferation Research and Engineering

    DTIC Science & Technology

    2002-01-01

    The Office of Nonproliferation Research and Engineering, part of the recently formed National Nuclear Security Administration within the Department...of Energy, conducts wide-ranging research for diverse end users at the federal and local level. As such, the Office faces a number of challenges in...planning methods. This report grew out of support provided to an advisory committee for the Office of Nonproliferation and National Security, an

  2. 24 CFR 582.120 - Consolidated plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Assistance Provided § 582.120 Consolidated plan. (a... is required to have, or has, a complete consolidated plan, or that is applying for Shelter Plus Care...

  3. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  4. Long-Range Facilities - Plan

    DTIC Science & Technology

    1981-07-31

    3. DATES COVERED 00-00-1981 to 00-00-1981 4. TITLE AND SUBTITLE Long-Range Facilities - Plan 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...sternwheeler “Mark Twain” for Disneyland and fabrication of eight 52 foot submarines for the Disneyland “Navy.” This was followed by fabrication of the masts...converting the PRESIDENT GRANT , PRESIDENT McKINLEY and PRESIDENT FILLMORE to container ships for American President Lines, Ltd. These ships were designed to

  5. Provision of family planning services in Tanzania: a comparative analysis of public and private facilities.

    PubMed

    Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd

    2012-12-01

    Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.

  6. Guidance for Preparing a Facility Plan. Revised Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)

  7. Quality-assurance plan for water-quality activities in the North Florida Program Office, Florida District

    USGS Publications Warehouse

    Berndt, Marian P.; Katz, Brian G.

    2000-01-01

    In accordance with guidelines set forth by the Office of Water Quality in the Water Resources Division of the U.S. Geological Survey, a quality-assurance plan was created for use by the Florida District's North Florida Program Office in conducting water-quality activities. This plan documents the standards, policies, and procedures used by the North Florida Program Office for activities related to the collection, processing, storage, analysis, and publication of water-quality data.

  8. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  9. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  10. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  11. Facilities Planning Conference for Community-Junior College State-Level Personnel.

    ERIC Educational Resources Information Center

    Florida Univ., Gainesville. Inst. of Higher Education.

    This report on planning and developing facilities for community-junior colleges includes papers presented at a conference for state-level facility planners. The meeting covered the following areas: (1) development of physical facilities responsive to educational programs and community needs; (2) efficient use of existing facilities through…

  12. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. State-of-the-Art Facility: A Planning Process.

    ERIC Educational Resources Information Center

    Day, C. William; Speicher, A. Dean

    Chief executive officers of school districts and facility planners must assume the role of change agent to meet the information needs of the 21st century. Public school learning, which will serve more groupings of people on a continual basis, will be disseminated through media learning centers. Management should follow six steps in planning…

  14. Planning the School Food Service Facilities. Revised 1967.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  15. 35. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-196. MOBILIZATION BUILDINGS; STANDARD HEATING DETAILS; WARM AIR HEATING; SMOKE PIPES & VENT HOODS FOR RANGES. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  16. Site maps and facilities listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less

  17. Northrop Triga facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the Triga facility decontamination and decommissioning plan to the actual results and discusses key areas where operational activities were impacted upon by the final US Nuclear Regulatory Commission (NRC)-approved decontamination and decommissioning plan. Total exposures for fuel transfer were a factor of 4 less than planned. The design of the Triga reactor components allowed the majority of the components to be unconditionally released.

  18. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a... ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions... a schedule the State accepts and such schedule is inserted as a special condition of the grant...

  19. School Facilities Planning. Research Report Number 1974-2.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…

  20. Department of Energy Arm Facilities on the North Slope of Alaska and Plans for a North Slope "Mega-Site"

    NASA Astrophysics Data System (ADS)

    Ivey, M.; Verlinde, J.

    2014-12-01

    The U.S. Department of Energy (DOE), through its scientific user facility, the Atmospheric Radiation Measurement (ARM) Climate Research Facility, provides scientific infrastructure and data to the international Arctic research community via its research sites located on the North Slope of Alaska. The DOE ARM Program has operated an atmospheric measurement facility in Barrow, Alaska, since 1998. Major upgrades to this facility, including scanning radars, were added in 2010. Facilities and infrastructure to support operations of unmanned aerial systems for science missions in the Arctic and North Slope of Alaska were established at Oliktok Point Alaska in 2013. Tethered instrumented balloons will be used in the near future to make measurements of clouds in the boundary layer including mixed-phase clouds. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is implementing "mega-sites" at the Southern Great Plains and North Slope of Alaska sites. Two workshops were held to gather input from the scientific community on these mega-sites. The NSA workshop was held September 10 and 11 in the Washington DC area. The workshops included discussions of additional profiling remote sensors, detailed measurements of the land-atmosphere interface, aerial operations to link the Barrow and Oliktok sites, unmanned aerial system measurements, and routine large eddy simulation model runs. The "mega-sites" represent a significant new scientific and infrastructure investment by DOE Office of Science, Office of Biological and Environmental Research. This poster will present information on plans for a North Slope "Megasite" as well as new opportunities for members of the arctic research community to make atmospheric measurements using unmanned aerial systems or tethered balloons in conjunction with the DOE ARM facilities on the North Slope of Alaska.

  1. Comprehensive Development Plan in Office Skills. Final Performance Report.

    ERIC Educational Resources Information Center

    Waubonsee Community Coll., Sugar Grove, IL.

    The Waubonsee Community College Comprehensive Development Plan in Office Skills served 208 students by assessment of basic skills and referral to appropriate programs or help with job skills and referral to employment during the 18-month grant period from December 1988 through June 30, 1990. The target population was minority women or economically…

  2. 37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-142. MOBILIZATION BUILDINGS; ALTERNATE PLATFORM CONSTRUCTION; 25'-0' & 29'-6' WIDE BLDG. - TWO STORY; POSTS AND BEARING PARTITIONS; SECTIONS & DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  3. A Guide for Planning and Construction of Public School Facilities in Georgia. School Food Service Facilities.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…

  4. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  5. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  6. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  7. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  8. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  9. 76 FR 2135 - Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-12

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1544] Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention, Office of Justice Programs, Department of Justice...

  10. Customized "In-Office" Three-Dimensional Printing for Virtual Surgical Planning in Craniofacial Surgery.

    PubMed

    Mendez, Bernardino M; Chiodo, Michael V; Patel, Parit A

    2015-07-01

    Virtual surgical planning using three-dimensional (3D) printing technology has improved surgical efficiency and precision. A limitation to this technology is that production of 3D surgical models requires a third-party source, leading to increased costs (up to $4000) and prolonged assembly times (averaging 2-3 weeks). The purpose of this study is to evaluate the feasibility, cost, and production time of customized skull models created by an "in-office" 3D printer for craniofacial reconstruction. Two patients underwent craniofacial reconstruction with the assistance of "in-office" 3D printing technology. Three-dimensional skull models were created from a bioplastic filament with a 3D printer using computed tomography (CT) image data. The cost and production time for each model were measured. For both patients, a customized 3D surgical model was used preoperatively to plan split calvarial bone grafting and intraoperatively to more efficiently and precisely perform the craniofacial reconstruction. The average cost for surgical model production with the "in-office" 3D printer was $25 (cost of bioplastic materials used to create surgical model) and the average production time was 14  hours. Virtual surgical planning using "in office" 3D printing is feasible and allows for a more cost-effective and less time consuming method for creating surgical models and guides. By bringing 3D printing to the office setting, we hope to improve intraoperative efficiency, surgical precision, and overall cost for various types of craniofacial and reconstructive surgery.

  11. A laboratory study for assessing speech privacy in a simulated open-plan office.

    PubMed

    Lee, P J; Jeon, J Y

    2014-06-01

    The aim of this study is to assess speech privacy in open-plan office using two recently introduced single-number quantities: the spatial decay rate of speech, DL(2,S) [dB], and the A-weighted sound pressure level of speech at a distance of 4 m, L(p,A,S,4) m [dB]. Open-plan offices were modeled using a DL(2,S) of 4, 8, and 12 dB, and L(p,A,S,4) m was changed in three steps, from 43 to 57 dB.Auditory experiments were conducted at three locations with source–receiver distances of 8, 16, and 24 m, while background noise level was fixed at 30 dBA.A total of 20 subjects were asked to rate the speech intelligibility and listening difficulty of 240 Korean sentences in such surroundings. The speech intelligibility scores were not affected by DL(2,S) or L(p,A,S,4) m at a source–receiver distance of 8 m; however, listening difficulty ratings were significantly changed with increasing DL(2,S) and L(p,A,S,4) m values. At other locations, the influences of DL(2,S) and L(p,A,S,4) m on speech intelligibility and listening difficulty ratings were significant. It was also found that the speech intelligibility scores and listening difficulty ratings were considerably changed with increasing the distraction distance (r(D)). Furthermore, listening difficulty is more sensitive to variations in DL(2,S) and L(p,A,S,4) m than intelligibility scores for sound fields with high speech transmission performances. The recently introduced single-number quantities in the ISO standard, based on the spatial distribution of sound pressure level, were associated with speech privacy in an open-plan office. The results support single-number quantities being suitable to assess speech privacy, mainly at large distances. This new information can be considered when designing open-plan offices and making acoustic guidelines of open-plan offices.

  12. Report on Collaborative Facilities Projects.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    California's community colleges develop their own requests in concert with their district five-year master plan. They then submit those requests to the State Chancellor's Office for review. This document discusses the current process of submitting proposals for collaborative facilities projects, and outlines and discusses five recommendations for…

  13. Surface Water Quality-Assurance Plan for the North Florida Program Office of the U.S. Geological Survey

    USGS Publications Warehouse

    Franklin, Marvin A.

    2000-01-01

    The U.S. Geological Survey, Water Resources Division, has a policy that requires each District office to prepare a Surface Water Quality-Assurance Plan. The plan for each District describes the policies and procedures that ensure high quality in the collection, processing, analysis, computer storage, and publication of surface-water data. The North Florida Program Office Surface Water Quality-Assurance Plan documents the standards, policies, and procedures used by the North Florida Program office for activities related to the collection, processing, storage, analysis, and publication of surface-water data.

  14. Space exploration initiative candidate nuclear propulsion test facilities

    NASA Technical Reports Server (NTRS)

    Baldwin, Darrell; Clark, John S.

    1993-01-01

    One-page descriptions for approximately 200 existing government, university, and industry facilities which may be available in the future to support SEI nuclear propulsion technology development and test program requirements are provided. To facilitate use of the information, the candidate facilities are listed both by location (Index L) and by Facility Type (Index FT). The included one-page descriptions provide a brief narrative description of facility capability, suggest potential uses for each facility, and designate a point of contact for additional information that may be needed in the future. The Nuclear Propulsion Office at NASA Lewis presently plans to maintain, expand, and update this information periodically for use by NASA, DOE, and DOD personnel involved in planning various phases of the SEI Nuclear Propulsion Project.

  15. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of the following: Policy analysis; standards and regulations; and management strategy and evaluation. The Assistant Administrator represents the Administrator with Congress and the Office of Management and Budget...

  16. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of the following: Policy analysis; standards and regulations; and management strategy and evaluation. The Assistant Administrator represents the Administrator with Congress and the Office of Management and Budget...

  17. Developing State Agency Facility Plans: A Guide to Planning and Implementation. Michigan Studies in Rehabilitation Utilization Series: 4.

    ERIC Educational Resources Information Center

    Miller, Juliet V.; Wargel, James F.

    Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…

  18. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  19. Planning the Library Media Center Facility for the 1990s and Beyond.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This manual presents recommendations for incorporating present and future technological changes into workable, efficient, pleasant school library media facilities in two major sections: Planning the Facility and Activity Areas. The first section addresses the planning process (appointing the building committee, evaluating the library media…

  20. Viewpoint: Planners as Sensemakers and Sensegivers--Reshaping Austerity in College and University Planning

    ERIC Educational Resources Information Center

    Harris, Nathan F.

    2011-01-01

    Many planning offices are experiencing an identity crisis. Before the recession, their role was clear: provide colleges and universities the analytical support needed to develop academic programs and expand facilities. For more than a decade, planning offices were the workhorses supporting ambitious growth strategies. New and improved programs and…

  1. Promoting the Construction of an Optimal Nurse's Office Facility: One School District's Experience.

    ERIC Educational Resources Information Center

    McKibben, Cynthia; DiPaolo, Sonja J.

    1997-01-01

    Details recommendations for updating or constructing nurses' offices based upon a descriptive study done in one midwestern school district. Suggestions are provided on size, location, and equipment needed. Also addressed is the communication process needed to persuade a board of education and school administrators that nursing facilities must be a…

  2. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...

  3. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  4. The requirements and feasibility of business planning in the office of space and terrestrial applications

    NASA Technical Reports Server (NTRS)

    Greenberg, J. S.; Miller, B. P.

    1979-01-01

    The feasibility of applying strategic business planning techniques which are developed and used in the private sector to the planning of certain projects within the NASA Office of Space and Terrestrial Applications was assessed. The methods of strategic business planning that are currently in use in the private sector are examined. The typical contents of a private sector strategic business plan and the techniques commonly used to develop the contents of the plan are described, along with modifications needed to apply these concepts to public sector projects. The current long-range planning process in the Office of Space and Terrestrial Applications is reviewed and program initiatives that might be candidates for the use of strategic business planning techniques are identified. In order to more fully illustrate the information requirements of a strategic business plan for a NASA program, a sample business plan is prepared for a hypothetical Operational Earth Resources Satellite program.

  5. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...

  6. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  7. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  8. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  9. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  10. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  11. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  12. Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.

    PubMed

    Johnson, Doug; Ugaz, Jorge

    2016-09-01

    We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality. © 2016 The Population Council, Inc.

  13. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  14. 29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVEGRADE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVE-GRADE FLOOR LEVEL. INEEL DRAWING NUMBER 200-0633-00-287-106354. FLUOR NUMBER 5775-CPP-633-A-4. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  15. Ice-On-Coil Diurnal Ice Storage Cooling System for a Barracks/Office/ Dining Hall Facility at Yuma Proving Ground, AZ

    DTIC Science & Technology

    1990-09-01

    Kedl is associated with the Oak Ridge National Laboratory ( ORNL ). The technical editor was Gloria J. Wienke, Information Management Office, USACERL. COL...of a DIS cooling system for Building 506, a barracks/ office/dining facility. Oak Ridge National Laboratory ( ORNL ) designed the system in cooperation... ORNL with assistance from YPG and analyzed by USACERL. R.J. Kedl and C.W. Sohn, As.vsment of Energy Storage Technologies for Army Facilities, Technical

  16. DFL, Canada's Space AIT Facilities - Current and Planned Capabilities

    NASA Astrophysics Data System (ADS)

    Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.

    2004-08-01

    The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.

  17. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) , Ordnance Dept. U.S. Army, proposed addition to dock at Sandy Hook, 1918 Ordnance wharf and boathouse - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  18. 38. OFFICE OF THE AREA ENGINEER; CAMP McCOY, WISCONSIN; PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. OFFICE OF THE AREA ENGINEER; CAMP McCOY, WISCONSIN; PLAN NUMBER 6150-11-B. CAMP McCOY PROJECT; MOBILIZATION BUILDINGS; CHIMNEY DETAILS. MAY 16, 1942; REVISED TO JUNE 22, 1942. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  19. 31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR AT MEZZANINE AND LOWER LEVELS. INEEL DRAWING NUMBER 200-0633-00-287-106352. FLUOR NUMBER 5775-CPP-633-A-2. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  20. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  1. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  2. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  3. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  4. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  5. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  6. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  7. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  8. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peeler, David K.; Kim, Dong-Sang; Vienna, John D.

    2015-11-01

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, keymore » product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule. The purpose of this advanced LAW glass research and development plan is to identify the near-term, mid-term, and longer-term research and development activities required to develop and validate advanced LAW glasses, property-composition models and their uncertainties, and an advanced glass algorithm to support WTP facility operations, including both Direct Feed LAW and full pretreatment flowsheets. Data are needed to develop, validate, and implement 1) new glass property-composition models and 2) a new glass formulation algorithm. Hence, this plan integrates specific studies associated with increasing the Na2O and SO3/halide concentrations in glass, because these components will ultimately dictate waste loadings for LAW vitrification. Of equal importance is the development of an efficient and economic strategy for 99Tc management. Specific and detailed studies are being implemented to understand the fate of Tc

  9. 30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE GRADE AND AT LEVEL OF OPERATING CORRIDOR. INEEL DRAWING NUMBER 200-0633-00-287-106351. FLUOR NUMBER 5775-CPP-633-A-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  10. SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  11. 77 FR 3787 - Notice of Submission of Proposed Information Collection to OMB; Office of Hospital Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. This information is collected from OHF staff, mortgagees, mortgagors, contractors and agents to manage and monitor the application, procedure, project administration and initial/final endorsement of projects undertaken by Office of Hospital Facilities.

  12. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) from Talcott, T.M.R., plot of a survey of site, Fort at Sandy Hook, NJ, 1859-1860 Detail of engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  13. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC), cartographer unknown, title unknown, March 28, 1892 1890 lifesaving station shown near fort and beach, no boathouse near engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  14. Places and Spaces: Facility Planning for Handicapped Children and Adults.

    ERIC Educational Resources Information Center

    Aiello, Barbara, Ed.

    Intended for special educators and architectural designers, the book provides specifications and lists of resource materials on facility design for handicapped children and adults. In an overview, R. Vosbeck discusses the need for cooperation between architects and educators and relates his experiences in planning facilities for exceptional…

  15. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Physician offices marketing: assessing patients' views of office visits.

    PubMed

    Emmett, Dennis; Chandra, Ashish

    2010-01-01

    Physician offices often lack the sense of incorporating appropriate strategies to make their facilities as marketer of their services. The patient experience at a physician's office not only incorporates the care they receive from the physician but also the other non-healthcare related aspects, such as the behavior of non-health professionals as well as the appearance of the facility itself. This paper is based on a primary research conducted to assess what patients assess from a physician office visit.

  17. 28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-154. MOBILIZATION BUILDINGS; STANDARD DOOR DETAILS; TYPES SCHEDULES & DETAILS. (This photograph was copied from a drawing at Fort McCoy. There is no negative of this drawing in the Military Construction 105mm. Negative Collection at Fort Belvoir.) - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  18. Private sector's role in public school facility planning.

    DOT National Transportation Integrated Search

    2009-03-01

    This report explores the role of private consultants in the school facility planning process. : It focuses on such issues as school siting and local government and school district collaboration. : As such, it seeks to demonstrate the importance of th...

  19. Photocopy of plan (in U.S. Army office of Army Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of plan (in U.S. Army office of Army Engineers plans and drawings, Fort Hancock and Sandy hook proving ground, record group 7, drawer 44, Cartographic and Architectural branc, The National Archives, Washington, DC) Gillespie, G.L., map of a portion of Sandy Hook, NJ showing condition of beach in vicinity of dynamite gun emplacements, 1894 Engineer's wharf - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ

  20. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  1. 77 FR 16541 - Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ...). Grants are made to Institutions of Higher Education that have entered into consortium arrangements with... DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests; Office of Planning..., which is administered by the Office of English Language Acquisition, is to support pre-service education...

  2. North Carolina Public Schools Facility Standards. A Guide for Planning School Facilities.

    ERIC Educational Resources Information Center

    Knott, Gerald H.; Lora, James M.; Acker, Marjorie L.; Taynton, Steven; Logan, Gladys B.; Harrell, Ronald C.

    The State of North Carolina has developed a planning guide for those in the process of building, enlarging, or renovating school facilities. This guide defines and describes the educational spaces needed to support a modern, comprehensive educational program and sets minimal standards for the types and sizes of spaces required. It serves as a…

  3. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  4. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  5. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  6. An integrated approach for facilities planning by ELECTRE method

    NASA Astrophysics Data System (ADS)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  7. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  8. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  9. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  10. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  11. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  12. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  13. This photographic copy of an engineering drawing shows floor plans, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  14. 75 FR 9232 - Office of Dietary Supplements (ODS) 2010-2014 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ...-2014. SUMMARY: The Office of Dietary Supplements (ODS) at the National Institutes of Health (NIH) has..., entitled Strengthening Knowledge and Understanding of Dietary Supplements. The strategic plan is available... the federal government, academia, the dietary supplement industry, consumer advocacy and education...

  15. Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation.more » It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs.« less

  16. Five Recession-Driven Strategies for Planning and Managing Campus Facilities

    ERIC Educational Resources Information Center

    Rudden, Michael S.

    2010-01-01

    Colleges and universities continue to face significant fiscal challenges in the current recession. A review of ongoing campus facilities planning projects, coupled with a review of more than 30 recent campus master planning requests for proposals and the relevant literature, indicates that colleges and universities are finding innovative ways to…

  17. 76 FR 64362 - Consolidated Delegation of Authority for the Office of Community Planning and Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... grants pursuant to section 214 of the Appalachian Regional Development Act of 1965, Public Law 89-4, 79... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5556-D-01] Consolidated Delegation of Authority for the Office of Community Planning and Development AGENCY: Office of the Secretary, HUD. ACTION...

  18. Natural and accelerated bioremediation research program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of themore » solution to DOE`s environmental problems.« less

  19. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  20. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  1. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  2. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  3. Athletic Facilities: Planning, Designing, and Operating Today's Physical-Education Centers.

    ERIC Educational Resources Information Center

    Spoor, Dana L.

    1998-01-01

    Examines what should be featured in an athletic facility, how to plan for the many different sports and activities that will be housed, and how to get the community involved. Areas addressed include planning for locker rooms and storage, flooring and lighting, building code adherence, spectator seating, building security, and outdoor recreation…

  4. Office Careers. Teacher's Guide. Pre-Vocational Office Education.

    ERIC Educational Resources Information Center

    Powell, Theressa

    This guide is intended for use in providing competency-based prevocational instruction in business and office occupations programs. Addressed in the individual units are the following topics: career awareness (career planning, decision making, and educational planning); personal assessment; the business and office cluster (bookkeeper, word…

  5. 76 FR 34093 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-23] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... 34094

  6. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY: Office of Ocean Exploration and Research (OER), Oceanic and Atmospheric Research (OAR), National Oceanic... comment. [[Page 15687

  7. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  8. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  9. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  10. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Eligibility to elect an MA plan for senior housing..., Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan, the...

  11. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  12. Analysis of EPA's Federal Facilities Restoration and Reuse Office (FFRRO) Regional Program Performance: Fiscal Years 2005-2011

    EPA Pesticide Factsheets

    This is a summary report of a series of analyses of the Federal Facilities Restoration and Reuse Office (FFRRO) regional programs' performance in meeting their annual targets for the last seven years (2005-2011).

  13. 77 FR 73060 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility... for a fuel cycle facility (NUREG-1520) provides NRC staff guidance for reviewing and evaluating the...

  14. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I cover more than one facility in my... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.3 May I cover more than one facility in my response plan? (a) Your response plan may be for a...

  15. LPT. Shield test facility (TAN645 and 646). Basement and subbasement ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645 and -646). Basement and sub-basement plan. Stairway plans and details. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-2. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107348 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  16. 77 FR 37248 - Delegations of Authority for the Office of Housing-Federal Housing Administration (FHA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...

  17. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  18. Disaster Preparedness Planning and Facility Contingency Operations for Public Works

    DTIC Science & Technology

    1993-01-01

    Forces Reporting Disaster Preparedness and Logistical Support 20-37 General Concept Manpower Planning, Protection and Support Personal Protection...their military mission, economical importance, geographical location, and personal and public safety. The organization, preparedness plans and facility...for emergency medical support). (5) Issue personal protective gear and equipment, if necessary. (6) Determine existi- g contract outcome. All

  19. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  20. Facilities Standards and Planning Manual for New Jersey County Community Colleges.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Higher Education, Trenton. Office of Community Coll. Programs.

    After some general comments concerning all guidelines, planning standards are described for--(1) various types of new facilities, (2) expansion of present facilities, (3) minimum space requirements for a college, (4) net-to-gross space ratios, and (5) total project costs. Information regarding capital construction project submissions procedure is…

  1. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  2. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  3. PLANNING AND COORDINATION OF ACTIVITIES SUPPORTING THE RUSSIAN SYSTEM OF CONTROL AND ACCOUNTING OF NUCLEAR MATERIALS AT ROSATOM FACILITIES IN THE FRAMEWORK OF THE U.S.-RUSSIAN COOPERATION.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SVIRIDOVA, V.V.; ERASTOV, V.V.; ISAEV, N.V.

    2005-05-16

    The MC&A Equipment and Methodological Support Strategic Plan (MEMS SP) for implementing modern MC&A equipment and methodologies at Rosatom facilities has been developed within the framework of the U.S.-Russian MPC&A Program. This plan developed by the Rosatom's Russian MC&A Equipment and Methodologies (MEM) Working Group and is coordinated by that group with support and coordination provided by the MC&A Measurements Project, Office of National Infrastructure and Sustainability, US DOE. Implementation of different tasks of the MEMS Strategic Plan is coordinated by Rosatom and US-DOE in cooperation with different U.S.-Russian MC&A-related working groups and joint site project teams. This cooperation allowsmore » to obtain and analyze information about problems, current needs and successes at Rosatom facilities and facilitates solution of the problems, satisfying the facilities' needs and effective exchange of expertise and lessons learned. The objective of the MEMS Strategic Plan is to enhance effectiveness of activities implementing modern equipment and methodologies in the Russian State MC&A system. These activities are conducted within the joint Russian-US MPC&A program aiming at reduction of possibility for theft or diversion of nuclear materials and enhancement of control of nuclear materials.« less

  4. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate themore » facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.« less

  5. 10 CFR 1.5 - Location of principal offices and Regional Offices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Location of principal offices and Regional Offices. 1.5 Section 1.5 Energy NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Introduction § 1.5 Location of principal offices and Regional Offices. (a) The principal NRC offices are located in the Washington, DC, area. Facilities...

  6. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. MTR, TRA603. SECOND FLOOR PLAN. OFFICES AND INSTRUMENT ROOM. STEEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR, TRA-603. SECOND FLOOR PLAN. OFFICES AND INSTRUMENT ROOM. STEEL PARTITIONS ON EAST SIDE OF INSTRUMENT ROOM. DETAIL OF COLUMN ENCASEMENTS. STAIRWAYS IN NORTH AND SOUTH CORNERS. PASSENGER ELEVATION. BLAW-KNOX 3150-803-3, 7/1950. INL INDEX NO. 531-0603-00-098-100562, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  8. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  9. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  10. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  11. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  12. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  13. 6 CFR 37.41 - Security plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Security plan. 37.41 Section 37.41 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY REAL ID DRIVER'S LICENSES AND IDENTIFICATION CARDS Security at DMVs and Driver's License and Identification Card Production Facilities § 37.41...

  14. 6 CFR 37.41 - Security plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Security plan. 37.41 Section 37.41 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY REAL ID DRIVER'S LICENSES AND IDENTIFICATION CARDS Security at DMVs and Driver's License and Identification Card Production Facilities § 37.41...

  15. 13. Photographic copy of site plan displaying Test Stand 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  16. 5. PRELIMINARY SKETCH OF THE GUIDED MISSILE TEST FACILITIES FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. PRELIMINARY SKETCH OF THE GUIDED MISSILE TEST FACILITIES FOR TEST AREA NUMBER 2. TODAY IR IS KNOWN AS MARSHALL SPACE FLIGHT CENTER'S EAST TEST AREA. HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL

  17. Elementary School Educational Specifications: Facilities Planning Standards. Edition III.

    ERIC Educational Resources Information Center

    Jefferson County School District R-1, Denver, CO.

    The Jefferson County School District (Denver, Colorado) has published this model standard for the planning and designing of new elementary schools, and the remodeling and modernizing existing schools. It describes the facility requirements to accommodate the instructional program, activities, and support functions to assist architects, school…

  18. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  19. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  20. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  1. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  2. Strategically Planning Avionics Laboratory’s Facilities for the Future

    DTIC Science & Technology

    1993-09-01

    Goldsboro Road Bethesda, Maryland 20817-5886 93 12 22 02 DISCLAIMII NOTICE THIS DOCUMENT IS BEST QUALITY AVAILABLE. THE COPY FURNISHLD TO DTIC CONTAINED A...Avionics Laboratory establish a multiyear strategy for improving its facility utilization nearly 7 years ago. That plan, which is still being implemented...experi- mental data transmission delays caused when on-line equipment is separated by as much as a mile. The plan - now nearly 7 years old - initiated

  3. Savannah River Site nuclear materials management plan FY 2017-2031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, V.

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less

  4. Professional burnout syndrome among correctional facility officers.

    PubMed

    Harizanova, Stanislava N; Tarnovska, Tanya H

    2013-01-01

    Correctional facilities present unique work places--the employees there work in tough, demanding and hazardous working conditions, in real life-threatening environment, subjected to physical and mental fatigue, risk of infectious diseases, work in shifts, with inadequate pay, etc. The aim of this study was to find the prevalence and level of burnout syndrome among employees working in the District Prison of the town of Plovdiv. The study included all employees that had direct contact with the inmates in the prison. We recruited 106 employees that participated in the study anonymously and voluntarily. The main instrument we used was the questionnaire designed according to the methods developed by V. Boiko, which allows identification of professional burnout syndrome in its three phases with four symptoms in each of the phases. We found a high prevalence of burnout syndrome among the staff in the District Prison in Plovdiv (74.53%). All three phases of burnout were found to have a high prevalence rate--the stress phase: 48.11%, the resistance phase: 66.98%, the exhaustion phase: 41.51%. The rank in the service hierarchy was found to be a predictor in the stress phase, B = 0.701, p = 0.048, Exp(B) = 2.106, 95%CI [1.00; 4.04]. The single officers (83.33% of the divorced and 55.56% of the single employees) and those of the staff that were more highly educated (78.72%) had elevated levels of burnout syndrome, and these manifested during the first 5 years of their service in the prison (77.78%). In Bulgaria at present the burnout syndrome has not been studied among employees working in correctional facilities. We found a high prevalence of the syndrome among the employees of the District Prison - Plovdiv. The younger, the single and the more educated employees had greater levels of burnout syndrome, which manifest during the first 5 years of their service. The results suggest that there is a need to develop and implement effective strategies to reduce and prevent

  5. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false State plan UR requirements and options; UR plan required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control:...

  6. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false State plan UR requirements and options; UR plan required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control:...

  7. Long Range Facilities Master Plan: 1986-2000, San Diego Unified School District.

    ERIC Educational Resources Information Center

    Blair, Billie; And Others

    The Long-Range Facilities Master Plan presents solution strategies and financing methods for accommodating a projected student enrollment increase of 45,000 between 1986 and 2000. This increase, plus limited financial resources, school use studies, and recent legislation, necessitated the plan. The issues include housing students, facility…

  8. Acoustic evaluation and adjustment of an open-plan office through architectural design and noise control.

    PubMed

    Passero, Carolina Reich Marcon; Zannin, Paulo Henrique Trombetta

    2012-11-01

    Arranging office space into a single open room offers advantages in terms of easy exchange of information and interaction among coworkers, but reduces privacy and acoustic comfort. Thus, the purpose of this work was to evaluate the acoustic quality of a real open-plan office and to propose changes in the room to improve the acoustic conditioning of this office. The computational model of the office under study was calibrated based on RT and STI measurements. Predictions were made of the RT and STI, which generated the radius of distraction r(D), and the rate of spatial decay of sound pressure levels per distance doubling DL(2) in the real conditions of the office and after modifications of the room. The insertion of dividers between work stations and an increase in the ceiling's sound absorption improved the acoustic conditions in the office under study. Copyright © 2012 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  9. Pediatric office emergencies.

    PubMed

    Fuchs, Susan

    2013-10-01

    Pediatricians regularly see emergencies in the office, or children that require transfer to an emergency department, or hospitalization. An office self-assessment is the first step in determining how to prepare for an emergency. The use of mock codes and skill drills make office personnel feel less anxious about medical emergencies. Emergency information forms provide valuable, quick information about complex patients for emergency medical services and other physicians caring for patients. Furthermore, disaster planning should be part of an office preparedness plan. Copyright © 2013 Elsevier Inc. All rights reserved.

  10. 33 CFR 106.405 - Format and content of the Facility Security Plan (FSP).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; (9) Security systems and equipment maintenance; (10) Security measures for access control; (11... Facility Security Plan (FSP). 106.405 Section 106.405 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES...

  11. 77 FR 38853 - Redelegation of Authority to the Deputy Assistant Secretaries in the Office of Community Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... section 214 of the Appalachian Regional Development Act of 1965, Public Law 89-4, 79 Stat. 5 (codified as... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5642-D-03] Redelegation of Authority to the Deputy Assistant Secretaries in the Office of Community Planning and Development AGENCY: Office of...

  12. 47 CFR 4.13 - Reports by the National Communications System (NCS) and by special offices and facilities, and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Reports by the National Communications System (NCS) and by special offices and facilities, and related responsibilities of communications providers. 4.13 Section 4.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL DISRUPTIONS TO...

  13. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0184] Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide...

  14. 4. PROPOSED C1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PROPOSED C-1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE GUIDED MISSILE CENTER AT REDSTONE ARSENAL, NEAR THE SOUTH END OF MADKIN MOUNTAIN. OCTOBER 1950, HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL

  15. 75 FR 35816 - Office of Planning, Research and Evaluation Advisory Committee on Head Start Research and Evaluation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... Planning, Research and Evaluation Advisory Committee on Head Start Research and Evaluation AGENCY...: This notice announces the re-establishment of the Advisory Committee on Head Start Research and... carrying out the independent research. FOR FURTHER INFORMATION CONTACT: Jennifer Brooks, Office of Planning...

  16. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  17. 78 FR 67223 - Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ..., 72, et al. Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 and Amendments to Material Control and Accounting Regulations; Proposed Rules #0;#0... Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 AGENCY...

  18. 75 FR 3750 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-03] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  19. 75 FR 28634 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-19] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  20. 76 FR 26312 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-18] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  1. 75 FR 55342 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-35] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  2. 75 FR 43194 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-28] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  3. 75 FR 39573 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-26] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  4. 75 FR 75487 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-47] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  5. 76 FR 2702 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-02] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  6. 75 FR 65366 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-41] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  7. 75 FR 68374 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-43] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Kathy Ezzell, Department of Housing and Urban Development, 451 Seventh Street...

  8. 77 FR 42753 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... landholding agencies at the following addresses: Coast Guard: Commandant, United States Coast Guard, Attn... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...

  9. 78 FR 7442 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... following addresses: Coast Guard: Commandant, United States Coast Guard, Attn: Jennifer Stomber, 2100 Second... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...

  10. 78 FR 755 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-01] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  11. 75 FR 76999 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-48] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  12. 76 FR 60855 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-41] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  13. 78 FR 50078 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-33] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  14. 77 FR 11149 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-08] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  15. 77 FR 67389 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-44] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  16. 78 FR 54905 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-36] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  17. 76 FR 22719 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-16] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  18. 76 FR 75554 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-48] Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  19. 76 FR 47606 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-31] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  20. 76 FR 28058 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-19] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  1. 75 FR 82409 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-51] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  2. 77 FR 29680 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-19] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  3. 75 FR 80836 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-50] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  4. 75 FR 79013 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-49] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  5. 78 FR 70066 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-45] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  6. 76 FR 66948 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-43] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  7. 78 FR 37561 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-25] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  8. 76 FR 70155 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-45] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  9. 78 FR 65698 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-42] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  10. 78 FR 64000 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-41] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  11. 78 FR 12344 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-08] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  12. 77 FR 4337 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-04] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  13. 76 FR 44033 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-29] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... FURTHER INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh...

  14. A long-term plan for evaluating the FHWA's Office of Safety programs : final draft

    DOT National Transportation Integrated Search

    2006-01-01

    The purpose of this report is to develop a generalized plan for evaluating and measuring the effectiveness of the major safety programs of the the FHWA Office of Safety. This report is organized into three sections in order to coincide with the state...

  15. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  16. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  17. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  18. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  19. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  20. Development of a Model for Planning an Educational Facility. [A] Practicum Report.

    ERIC Educational Resources Information Center

    Boughner, Wesley; And Others

    This publication is composed of two separate entities: a relatively brief manuscript entitled "Development of a Model for Planning an Educational Facility" and a much more lengthy Midi-Practicum Report that describes the implementation of the plans outlined in the first manuscript. Each of the three authors wrote one section of the first…

  1. Planning Related to the Curation and Processing of Returned Martian Samples

    NASA Astrophysics Data System (ADS)

    McCubbin, F. M.; Harrington, A. D.

    2018-04-01

    Many of the planning activities in the NASA Astromaterials Acquisition and Curation Office at JSC are centered around Mars Sample Return. The importance of contamination knowledge and the benefits of a mobile/modular receiving facility are discussed.

  2. Capacity planning for batch and perfusion bioprocesses across multiple biopharmaceutical facilities.

    PubMed

    Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S

    2014-01-01

    Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2014 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers.

  3. Guidelines for preparing a quality assurance plan for district offices of the U.S. Geological Survey

    USGS Publications Warehouse

    Schroder, L.J.; Shampine, W.J.

    1992-01-01

    The U.S. Geological Survey has a policy that requires each District office to prepare a Quality Assurance Plan. This plan is a combination of a District's management principles and quality assurance processes. The guidelines presented in this report provide a framework or expanded outline that a District can use to prepare a plan. Parti- cular emphasis is given to a District's: (1) quality assurance policies; (2) organization and staff responsibilities; and (3) program and project planning. The guidelines address the 'how', 'what', and 'who' questions that need to be answered when a District Quality Assurance Plan is prepared.

  4. A Comprehensive Laboratory Animal Facility Pandemic Response Plan

    PubMed Central

    Roble, Gordon S; Lingenhol, Naomi M; Baker, Bryan; Wilkerson, Amy; Tolwani, Ravi J

    2010-01-01

    The potential of a severe influenza pandemic necessitates the development of an organized, rational plan for continued laboratory animal facility operation without compromise of the welfare of animals. A comprehensive laboratory animal program pandemic response plan was integrated into a university-wide plan. Preparation involved input from all levels of organizational hierarchy including the IACUC. Many contingencies and operational scenarios were considered based on the severity and duration of the influenza pandemic. Trigger points for systematic action steps were based on the World Health Organization's phase alert criteria. One extreme scenario requires hibernation of research operations and maintenance of reduced numbers of laboratory animal colonies for a period of up to 6 mo. This plan includes active recruitment and cross-training of volunteers for essential personnel positions, protective measures for employee and family health, logistical arrangements for delivery and storage of food and bedding, the removal of waste, and the potential for euthanasia. Strategies such as encouraging and subsidizing cryopreservation of unique strains were undertaken to protect valuable research assets and intellectual property. Elements of this plan were put into practice after escalation of the pandemic alerts due to influenza A (H1N1) in April 2009. PMID:20858365

  5. 76 FR 40386 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-27] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  6. 76 FR 57754 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-37] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street, SW., Room...

  7. 77 FR 22335 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-15] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  8. 78 FR 16521 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-11] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  9. 78 FR 26061 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-18] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  10. 77 FR 25189 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-16] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  11. 76 FR 68498 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-44] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  12. 77 FR 40078 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-26] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  13. 76 FR 59150 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5477-N-38] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  14. 78 FR 48710 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-32] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  15. 78 FR 73554 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-47] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  16. 77 FR 75642 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-50] Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  17. 77 FR 5525 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5601-N-05] Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  18. 78 FR 77141 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5681-N-49] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... INFORMATION CONTACT: Juanita Perry, Department of Housing and Urban Development, 451 Seventh Street SW., Room...

  19. 78 FR 20686 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ...-8145; Coast Guard: Commandant, United States Coast Guard, Attn: Jennifer Stomber, 2100 Second St. SW... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...

  20. 75 FR 60777 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...: Commandant, United States Coast Guard, Attn: Jennifer Stomber, 2100 Second St., SW., Stop 7901, Washington... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for possible use to assist the homeless. FOR...

  1. 75 FR 6047 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-05] Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  2. 75 FR 41510 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-27] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  3. 75 FR 63501 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-40] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  4. 75 FR 49512 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-31] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  5. 75 FR 57052 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-36] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  6. 75 FR 62414 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-39] Federal Property Suitable as Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  7. 75 FR 66774 - Federal Property Suitable as Facilities to Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5375-N-42] Federal Property Suitable as Facilities to Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... Urban Development, 451 Seventh Street, SW., Room 7262, Washington, DC 20410; telephone (202) 708-1234...

  8. Career Education Facilities: A Planning Guide for Space and Station Requirements. A Report

    ERIC Educational Resources Information Center

    Woodruff, Alan P.

    This publication provides the educational planner and the architect with some suggestions concerning models by which they may plan new flexible-use, shared-space facilities and supports the models with guidelines for the development of facilities and educational programs for occupational education. In addition to discussing the financial…

  9. 29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, CABLE CHASE, SHIELDING TANK AND FRAME ASSEMBLY. F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-1. INEL INDEX CODE NUMBER: 075 0701 851 151970. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  10. APPA: Association of Higher Education Facilities Officers Educational Conference and Annual Meeting Proceedings (82nd, Philadelphia, Pennsylvania, July 16-18, 1995).

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    The 23 papers presented in this Proceedings are grouped into four categories: business management; facilities planning, design, and construction; human resource management; and energy and environment. Papers are: (1) "A Business Approach to the Facility Function" (Alan B. Abramson); (2) "Management by Strategic Planning" (Jerry C. Black); (3)…

  11. 77 FR 47077 - Statement of Organization, Functions, and Delegations of Authority; Office of Planning, Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ...; surveys, research and evaluation methodologies; demonstration testing and model development; synthesis and..., policy and program analysis; surveys, research and evaluation methodologies; demonstration testing and... Organization, Functions, and Delegations of Authority; Office of Planning, Research and Evaluation AGENCY...

  12. 76 FR 9276 - Tank Vessel and Marine Transportation-Related Facility Response Plans for Hazardous Substances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...

  13. Governance and implementation of sports safety practices by municipal offices in Swedish communities.

    PubMed

    Backe, S; Janson, S; Timpka, T

    2012-01-01

    The objective of this study was to explore whether all-purpose health or safety promotion programmes and sports safety policies affect sports safety practices in local communities. Case study research methods were used to compare sports safety activities among offices in 73 Swedish municipalities; 28 with ongoing health or safety promotion programmes and 45 controls. The offices in municipalities with the WHO Healthy Cities (HC) or Safe Communities programmes were more likely to perform frequent inspections of sports facilities, and offices in the WHO HC programme were more likely to involve sports clubs in inspections. More than every second, property management office and environmental protection office conducted sports safety inspections compared with less than one in four planning offices and social welfare offices. It is concluded that all-purpose health and safety promotion programmes can reach out to have an effect on sports safety practices in local communities. These safety practices also reflect administrative work routines and managerial traditions.

  14. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  15. The Need to Update Space Planning Policies for the California Community Colleges. Fact Sheet 05-07

    ERIC Educational Resources Information Center

    California Postsecondary Education Commission, 2005

    2005-01-01

    California plans its development of public higher education facilities using policies called "space and utilization" guidelines and standards. These are budgetary planning tools that can measure existing and future need for academic spaces such as classrooms, laboratories, research space, and faculty offices. California's current space…

  16. 78 FR 68858 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... speech-impaired (202) 708-2565, (these telephone numbers are not toll- free), or call the toll-free Title... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for possible use to assist the homeless. FOR...

  17. Nursing home evacuation plans.

    PubMed

    Castle, Nicholas G

    2008-07-01

    I examined evacuation plans from 2134 nursing homes and analyzed national data to determine the types of nursing homes cited for deficiencies in their evacuation plans. Evacuation plans were assessed according to criteria developed by an expert panel funded by the Office of the Inspector General. Deficiency citations came from the Online Survey, Certification, and Recording database, collected from 1997 to 2005. Four specific citations, for written emergency plans, staff training, written evacuation plans, and fire drills, were examined with multivariate logistic regression. Most plans had water supply provisions (96%). Only 31% specified an evacuation route. The rate of citations was relatively stable throughout the study period: each year approximately 0.6% of facilities were found to be deficient in written emergency plans, 2.1% in staff training, 1.2% in written evacuation plans, and 7.9% in fire drills. Some nursing homes need more specific evacuation plans. Water supply was the most and evacuation routes were the least well-addressed areas.

  18. Developing a plan for primary health care facilities in Soweto, South Africa. Part II: Applying locational criteria.

    PubMed

    Doherty, J; Rispel, L; Webb, N

    1996-12-01

    This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.

  19. Family planning offered in local welfare offices.

    PubMed

    1998-04-01

    This article describes expanded access to family planning (FP) services through community welfare offices in Washington state, US. The government aim is to decrease unintended pregnancies and to help families achieve self-sufficiency. The staff must be sensitive and respectful of clients served. The team effort includes contacting clients in other community locations to offer FP education. The approach is characterized as "1-stop shopping" that includes FP, welfare, access to jobs, training, and medical coupons. Preventing unintended pregnancies is cost effective. A state (90%) investment of $40/person for contraceptives is good business compared to $400/person as a 50/50 state/federal investment in prenatal and delivery costs. The program began in 1992, by educating staff members in community services offices (CSOs) about FP issues. In 1994, the program hired registered nurses and nurse practitioners at CSOs to provide FP services. Almost all CSOs now have nurses, and there are 8 full exam clinics. A resource handbook for CSO workers and FP nurses was compiled by state and local FP personnel. CSOs typically assign 1 staff member to FP, usually on a part time basis. Close collaboration between nurses and CSO workers usually involves more creative strategies and outreach projects. For example, in 1 CSO in Washington, the FP worker offers contraceptive counseling, pregnancy tests, and sexually transmitted disease prevention. Contraceptives are provided at a separate time with local private providers or at health department clinics. CSOs continue to provide counseling regardless of referrals to private clinics. The project is growing and forming collaborations with other FP groups. These 1-stop sites offer accessible, familiar, and comfortable services.

  20. SPERTI Control Building (PER601) floor plan. Detail of cable inlet. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Control Building (PER-601) floor plan. Detail of cable inlet. Idaho Operations Office. Date: February 1955. INEEL index no. 760-0601-00-396-109139 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  1. Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's

    NASA Technical Reports Server (NTRS)

    Zobrist, George W.

    1994-01-01

    This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.

  2. Capacity Planning for Batch and Perfusion Bioprocesses Across Multiple Biopharmaceutical Facilities

    PubMed Central

    Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S

    2014-01-01

    Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2013 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers Biotechnol. Prog., 30:594–606, 2014 PMID:24376262

  3. Office of the Chief Financial Officer Strategic Plan2008-2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Various

    2007-11-19

    This is an update to the Office of the Chief Financial Officer's (OCFO's) multi-year strategy to continue to build a highly effective, efficient and compliant financial and business approach to support the scientific mission of Lawrence Berkeley National Laboratory (LBNL). The guiding principles of this strategy are to provide the greatest capability for the least cost while continually raising the standards of professional financial management in service to the LBNL science mission.

  4. Use of information systems in Air Force medical treatment facilities in strategic planning and decision-making.

    PubMed

    Yap, Glenn A; Platonova, Elena A; Musa, Philip F

    2006-02-01

    An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.

  5. Adverse outcomes after planned surgery with anticipated intensive care admission in out-of-office-hours time periods: a multicentre cohort study.

    PubMed

    Morgan, D J; Ho, K M; Kolybaba, M L; Ong, Y J

    2018-06-01

    Increasing mortality for patients admitted to hospitals during the weekend is a contentious but well described phenomenon. However, it remains uncertain whether adverse outcomes, including prolonged hospital length-of-stay (LOS), may also occur after patients undergoing major planned surgery are admitted to an intensive care unit (ICU) out-of-office-hours, either during weeknights (after 18:00) or on weekends. All planned surgical admissions requiring admission to one of 183 ICUs across Australia and New Zealand between 2006 and 2016 were included in this retrospective population-based cohort study. Primary outcomes were hospital LOS and hospital mortality. Of the total 504 713 planned postoperative ICU admissions, 33.6% occurred during out-of-office-hours. After adjusting for available risk factors, out-of-office-hours ICU admissions were associated with a significant increase in hospital LOS [+2.6 days, 95% confidence interval (CI) 2.5-2.6], mortality [odd ratio (OR) 1.5, 95%CI 1.4-1.6], and a reduced chance of being directly discharged home (OR 0.8, 95%CI 0.8-0.8). The strongest association for adverse outcomes occurred with weekend ICU admissions (hospital LOS: +3.0 days, 95%CI 3.2-3.6; hospital mortality: OR 1.7, 95%CI 1.6-1.8). Clustering of adverse outcomes by hospitals was not observed in the generalised estimating equation analyses. Despite a greater clinical staff availability and higher monitoring levels, planned surgery requiring anticipated out-of-office-hours ICU admission was associated with a prolonged hospital LOS, reduced discharge directly home, and increased mortality compared with in-office-hours admissions. Our findings have potential clinical, economic and health policy implications on how complex planned surgery should be planned and managed. Copyright © 2018 British Journal of Anaesthesia. All rights reserved.

  6. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  7. 76 FR 3921 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for possible use to assist the homeless. FOR... and section 501 of the Stewart B. McKinney Homeless Assistance Act (42 U.S.C. 11411), as amended, HUD...

  8. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  9. 77 FR 39490 - Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy Development; Evaluation of the Carol M. White Physical Education Program SUMMARY: The Carol M. White Physical Education Program (PEP) supports a variety of projects that encourage fitness...

  10. 78 FR 21871 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... promulgated on May 10, 2006. Connecticut DEEP's State Plan is for implementing and enforcing provisions at... and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut; 111(d)/129 Revised State Plan for Large and Small Municipal Waste Combustors AGENCY: Environmental Protection Agency...

  11. Advanced Simulation in Undergraduate Pilot Training (ASUPT) Facility Utilization Plan.

    ERIC Educational Resources Information Center

    Hagin, William V.; Smith, James F.

    The capabilities of a flight simulation research facility located at Williams AFB, Arizona are described. Research philosophy to be applied is discussed. Long range and short range objectives are identified. A time phased plan for long range research accomplishment is described. In addition, some examples of near term research efforts which will…

  12. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  13. 75 FR 78952 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; Commonwealth of Virginia... Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION... request for EPA withdrawal of its section 111(d)/129 plan (the plan) approval for HMIWI units. Submittal...

  14. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  15. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less

  16. Endangered Species Act and energy facility planning: compliance and conflict

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shreeve, D; Calef, C; Nagy, J

    1978-05-01

    New energy facilities such as coal mines, gasification plants, refineries, and power plants--because of their severe environmental impacts--may, if sited haphazardly, jeopardize endangered species. By law, conflicts between energy-facility siting and endangered species occurrence must be minimized. To assess the likelihood of such conflicts arising, the authors used data from the Fish and Wildlife Service, Endangered Species Office, that describe the species' ranges by county. This data set was matched with county-level occurrences of imminent energy developments to find counties of overlap and hence potential conflict. An index was developed to measure the likelihood of actual conflict occurring in suchmore » counties. Factors determining the index are: numbers of endangered species inhabiting the county, number of energy-related developments, and to what degree the county remains in a wild or undeveloped state. Maps were prepared showing (1) geographic ranges of endangered species by taxonomic groups (mammals, fish, etc.) and (2) counties of conflict.« less

  17. A Guide for Planning Facilities for Vocational Agriculture in Texas.

    ERIC Educational Resources Information Center

    Hindman, Neal; Eggenberger, Lewis

    A guide to assist those concerned in planning adequate, well-designed facilities for departments of vocational agriculture that will serve their communities in the future. The program of vocational agriculture is an integral part of the total educational program of a school and considerable thought and careful study should be given to locating the…

  18. 30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3859-46, Y&D Drawing 190833. Scales 1' = 50' and 1' = 10'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  19. The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

    NASA Technical Reports Server (NTRS)

    Morris, D. G.; Burke, E. S.

    2002-01-01

    The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

  20. Facilities Performance Indicators Report 2013-14: Tracking Your Facilities Vital Signs

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, 2015

    2015-01-01

    This paper features an expanded Web-based "Facilities Performance Indicators (FPI) Report." The purpose of APPA: Association of Higher Education Facilities Officers (APPA's) Facilities Performance Indicators is to provide a representative set of statistics about facilities in educational institutions. "The Facilities Performance…

  1. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  2. Master Plan for Educational Facilities: Garwood, Union County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Garwood, New Jersey, is a small borough of 0.69 square miles with an estimated population in 1978 of 4,856 persons. This master plan for educational facilities begins with an overview of the district that describes its beginnings as an industrial community. A number of maps illustrate characteristics of the area including its topography,…

  3. Results of an Initial Field Study of New Techniques for Citizen Participation in Educational Facilities Planning.

    ERIC Educational Resources Information Center

    Zucker, Charles B.

    The utility of a particular citizen participation planning approach as applied to educational facilities planning is described. With the aid of a clear-cut decisionmaking procedure, citizens could participate effectively in the development of specific planning policy statements. Such statements could be used to discuss planning priorities, focus…

  4. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  5. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  6. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  7. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Submission and approval of facilities plan. 35.917-8 Section 35.917-8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  8. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Revision or amendment of facilities plan. 35.917-9 Section 35.917-9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  9. Facility Programming and Construction Criteria [Planning Guide]. 702 KAR 4:170.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Div. of Facilities Management.

    This facility construction planning guide presents the minimum instructional space standards for Kentucky's public school system. It provides definitions of terms found in the regulations; presents space requirements for every type of instructional space within a public school, including circulation areas, storage, and mechanical/electrical areas;…

  10. 76 FR 23630 - Office of New Reactors; Proposed Revision 2 to Standard Review Plan, Section 1.0 on Introduction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... Standard Review Plan, Section 1.0 on Introduction and Interfaces AGENCY: Nuclear Regulatory Commission (NRC... Revision 2 to Standard Review Plan (SRP), Section 1.0, ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110110573). The Office of New Reactors (NRO...

  11. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moss, R. H.; Blohm, A. J.; Delgado, A.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before finalmore » conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and

  12. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Fort Hall Indian Reservation. Bag leak detection guidance means Office of Air Quality Planning... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... the meaning accorded them under the Clean Air Act, except as follows: Astaris-Idaho or Astaris-Idaho...

  13. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    (s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less

  14. Strategic planning and marketing research for older, inner-city health care facilities: a case study.

    PubMed

    Wood, V R; Robertson, K R

    1992-01-01

    Numerous health care facilities, located in downtown metropolitan areas, now find themselves surrounded by a decaying inner-city environment. Consumers may perceive these facilities as "old," and catering to an "urban poor" consumer. These same consumers may, therefore, prefer to patronize more modern facilities located in suburban areas. This paper presents a case study of such a health care facility and how strategic planning and marketing research were conducted in order to identify market opportunities and new strategic directions.

  15. End State Condition Report for Materials and Fuels Complex Facilities MFC-799, 799A, and 770C

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Mecham

    2010-10-01

    The Materials and Fuels Complex (MFC) facilities MFC-799, “Sodium Processing Facility” (a single building consisting of two areas: the Sodium Process Area and the Carbonate Process Area); MFC-799A, “Caustic Storage Area;” and MFC-770C, “Nuclear Calibration Laboratory,” have been declared excess to future Department of Energy (DOE) Office of Nuclear Energy(NE) mission requirements. Transfer of these facilities from NE to the DOE Office of Environmental Management (EM), and an associated schedule for doing so, have been agreed upon by the two offices. This report documents the completion of pre-transfer stabilization actions, as identified in DOE Guide 430.1-5, “Transition Implementation Guide,” formore » buildings MFC-799/799A and 770C, and indicates that these facilities are ready for transfer from NE to EM. The facilities are in a known, safe condition and information is provided to support efficient decommissioning and demolition (D&D) planning while minimizing the possibility of encountering unforeseen circumstances during the D&D activities.« less

  16. FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING REMOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL LABORATORY, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-008-105065. ALTERNATE ID NUMBER 4272-14-102. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  17. 77 FR 31971 - Consolidated Delegation of Authority for the Office of Community Planning and Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... section 214 of the Appalachian Regional Development Act of 1965, Public Law 89-4, 79 Stat. 5 (codified as... Vol. 77 Wednesday, No. 104 May 30, 2012 Part III Department of Housing and Urban Development Consolidated Delegation of Authority for the Office of Community Planning and Development; Order of Succession...

  18. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  19. FPEF (Fluid Physics Experiment Facility) for the planned MS (Marangoni Surface) experiment

    NASA Image and Video Library

    2009-07-01

    ISS020-E-016214 (1 July 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, prepares the Fluid Physics Experiment Facility (FPEF) for the planned Marangoni Surface experiment in the Kibo laboratory of the International Space Station.

  20. SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) WARM LABORATORY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) WARM LABORATORY ROOM, DECONTAMINATION ROOM, HOT CHEMISTRY LABORATORY, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-098-105066. ALTERNATE ID NUMBER 4272-14-103. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Astrophysics Data System (ADS)

    Kauffmann, Paul J.

    1994-12-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  2. Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

    NASA Technical Reports Server (NTRS)

    Kauffmann, Paul J.

    1994-01-01

    The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

  3. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less

  4. Hazardous Waste Certification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance frommore » the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22.« less

  5. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  6. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  8. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  9. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, A. A.; Peeler, D. K.; Kim, D. S.

    2015-11-23

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, keymore » product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule.« less

  10. 47 CFR 0.21 - Functions of the Office.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Functions of the Office. 0.21 Section 0.21 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization Office of Strategic Planning and Policy Analysis § 0.21 Functions of the Office. The Office of Strategic Planning and Policy...

  11. Impact of the Urban Reproductive Health Initiative on family planning uptake at facilities in Kenya, Nigeria, and Senegal.

    PubMed

    Winston, Jennifer; Calhoun, Lisa M; Corroon, Meghan; Guilkey, David; Speizer, Ilene

    2018-01-05

    The 2012 London Summit on Family Planning set ambitious goals to enable 120 million more women and adolescent girls to use modern contraceptives by 2020. The Urban Reproductive Health Initiative (URHI) was a Bill & Melinda Gates Foundation funded program designed to help contribute to these goals in urban areas in India, Kenya, Nigeria, and Senegal. URHI implemented a range of country-specific demand and supply side interventions, with supply interventions generally focused on improved service quality, provider training, outreach to patients, and commodity stock management. This study uses data collected by the Measurement, Learning & Evaluation (MLE) Project to examine the effectiveness of these supply-side interventions by considering URHI's influence on the number of family planning clients at health facilities over a four-year period in Kenya, Nigeria, and Senegal. The analysis used facility audits and provider surveys. Principal-components analysis was used to create country-specific program exposure variables for health facilities. Fixed-effects regression was used to determine whether family planning uptake increased at facilities with higher exposure. Outcomes of interest were the number of new family planning acceptors and the total number of family planning clients per reproductive health care provider in the last year. Higher program component scores were associated with an increase in new family planning acceptors per provider in Kenya (β = 18, 95% CI = 7-29), Nigeria (β = 14, 95% CI = 8-20), and Senegal (β = 7, 95% CI = 3-12). Higher scores were also associated with more family planning clients per provider in Kenya (β = 31, 95% CI = 7-56) and Nigeria (β = 26, 95% CI = 15-38), but not in Senegal. Supply-side interventions have increased the number of new family planning acceptors at facilities in urban Nigeria, Kenya, and Senegal and the overall number of clients in urban Nigeria and Kenya. While tailoring

  12. My Work in the NASA Glenn History Office and Records Management Office

    NASA Technical Reports Server (NTRS)

    Mate, Robert C.

    2004-01-01

    This is my fourth summer working with my mentor, Kevin P. Coleman, who is the Center History Coordinator, Center Records Manager, and Center Forms Manager. I am working in the GRC History Office with some overlap in the Records Management Office. I have three major projects this summer. First, I am assisting in the documentation of historic facilities. Second, I am involved in a project to organize files and create an archives at Plum Brook Station. Third, I have helped the records management office with its inventory of stored records at Plum Brook. Also, I received an award this summer for research work I had done for NASA in the past. First, my primary project is to help assemble documentation for historic facilities at Glenn. This is somewhat of an extension of my project from last summer. Last summer, I worked to compile a complete list of all of NASA s historic sites and landmarks (as designated by the National Park Service, as well as several private organizations) throughout the country. Then, I briefly researched the significance of historic designation under federal law. Finally, I put my findings into a report which was submitted to NASA Headquarters. Upon review by the NASA History Office and several center-level history officials, it was decided that NASA should work to update its documentation of its historic sites and landmarks since some of the documentation was outdated or unavailable. Until recently, many project managers and facility managers working at historic facilities were not even aware that their surroundings had been designated as historic under federal law (most specifically, the National Historic Preservation Act of 1966 and its amendments). Therefore, they were unaware of the legal obligations for historic preservation. This summer, my project is to research some of Glenn s historic sites and landmarks in more detail. The goal is to put together a template for documenting historic NASA facilities. The hope is that this template of

  13. 76 FR 80865 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants; State of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Promulgation of State Plans for Designated Facilities and Pollutants; State of Florida; Control of Hospital/ Medical/Infectious Waste Incinerator (HMIWI) Emissions From Existing Facilities AGENCY: Environmental... Guidelines (EGs) applicable to existing Hospital/Medical/Infectious Waste Incinerators (HMIWIs). These EGs...

  14. 76 FR 39922 - Office of New Reactors; Proposed Revision 4 to Standard Review Plan Section 8.1 on Electric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... the proposed Revision 4 to Standard Review Plan Section 8.1 on ``Electric Power-- Introduction.'' The... NUCLEAR REGULATORY COMMISSION [NRC-2011-0119] Office of New Reactors; Proposed Revision 4 to Standard Review Plan Section 8.1 on Electric Power--Introduction, Correction AGENCY: Nuclear Regulatory...

  15. Master Plan for Educational Facilities: Midland Park, Bergen County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Midland Park, New Jersey, is a small borough with an estimated population in 1978 of 8,500 persons. The first part of the master plan for educational facilities in the area begins with an overview using maps to illustrate characteristics including its topography, relationship to key population centers and major transportation routes, boundaries,…

  16. Tuning the cognitive environment: Sound masking with 'natural' sounds in open-plan offices

    NASA Astrophysics Data System (ADS)

    DeLoach, Alana

    With the gain in popularity of open-plan office design and the engineering efforts to achieve acoustical comfort for building occupants, a majority of workers still report dissatisfaction in their workplace environment. Office acoustics influence organizational effectiveness, efficiency, and satisfaction through meeting appropriate requirements for speech privacy and ambient sound levels. Implementing a sound masking system is one tried-and-true method of achieving privacy goals. Although each sound masking system is tuned for its specific environment, the signal -- random steady state electronic noise, has remained the same for decades. This research work explores how `natural' sounds may be used as an alternative to this standard masking signal employed so ubiquitously in sound masking systems in the contemporary office environment. As an unobtrusive background sound, possessing the appropriate spectral characteristics, this proposed use of `natural' sounds for masking challenges the convention that masking sounds should be as meaningless as possible. Through the pilot study presented in this work, we hypothesize that `natural' sounds as sound maskers will be as effective at masking distracting background noise as the conventional masking sound, will enhance cognitive functioning, and increase participant (worker) satisfaction.

  17. Nuclear reactors built, being built, or planned 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1993. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristic and statistical datamore » that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: civilian, production, military, export, and critical assembly.« less

  18. Office design's impact on sick leave rates.

    PubMed

    Bodin Danielsson, Christina; Chungkham, Holendro Singh; Wulff, Cornelia; Westerlund, Hugo

    2014-01-01

    The effect of office type on sickness absence among office employees was studied prospectively in 1852 employees working in (1) cell-offices; (2) shared-room offices; (3) small, (4) medium-sized and (5) large open-plan offices; (6) flex-offices and (7) combi-offices. Sick leaves were self-reported two years later as number of (a) short and (b) long (medically certified) sick leave spells as well as (c) total number of sick leave days. Multivariate logistic regression analysis was used, with adjustment for background factors. A significant excess risk for sickness absence was found only in terms of short sick leave spells in the three open-plan offices. In the gender separate analysis, this remained for women, whereas men had a significantly increased risk in flex-offices. For long sick leave spells, a significantly higher risk was found among women in large open-plan offices and for total number of sick days among men in flex-offices. A prospective study of the office environment's effect on employees is motivated by the high rates of sick leaves in the workforce. The results indicate differences between office types, depending on the number of people sharing workspace and the opportunity to exert personal control as influenced by the features that define the office types.

  19. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  20. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  1. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  2. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  3. A Guide for Planning Facilities for Occupational Preparation Programs for Dental Laboratory Technicians. Research Series No. 34.

    ERIC Educational Resources Information Center

    Macconnell, James D., And Others

    The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…

  4. 3S (Safeguards, Security, Safety) based pyroprocessing facility safety evaluation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ku, J.H.; Choung, W.M.; You, G.S.

    The big advantage of pyroprocessing for the management of spent fuels against the conventional reprocessing technologies lies in its proliferation resistance since the pure plutonium cannot be separated from the spent fuel. The extracted materials can be directly used as metal fuel in a fast reactor, and pyroprocessing reduces drastically the volume and heat load of the spent fuel. KAERI has implemented the SBD (Safeguards-By-Design) concept in nuclear fuel cycle facilities. The goal of SBD is to integrate international safeguards into the entire facility design process since the very beginning of the design phase. This paper presents a safety evaluationmore » plan using a conceptual design of a reference pyroprocessing facility, in which 3S (Safeguards, Security, Safety)-By-Design (3SBD) concept is integrated from early conceptual design phase. The purpose of this paper is to establish an advanced pyroprocessing hot cell facility design concept based on 3SBD for the successful realization of pyroprocessing technology with enhanced safety and proliferation resistance.« less

  5. 40 CFR 35.917-7 - State review and certification of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false State review and certification of facilities plan. 35.917-7 Section 35.917-7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works...

  6. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less

  7. Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Middleman, L.I.

    1990-06-01

    This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less

  8. 75 FR 81612 - The Consumer Operated and Oriented Plan (CO-OP) Advisory Board; Office of Consumer Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Operated and Oriented Plan (CO-OP) Advisory Board; Office of Consumer Information and Insurance Oversight... and Insurance Oversight (OCIIO) on the Department's strategy to foster the creation of qualified... and Insurance Oversight (OCIIO) on the Department's strategy to foster the creation of qualified...

  9. 77 FR 16852 - Notice of Reclassification of Five Regional Offices to Investigative Field Offices: Seattle, WA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ..., it does not need to reorganize. This notice also includes a cost-benefit analysis supporting the...-benefit analysis of the effect of the plan on the office involved. The required cost-benefit analysis must... such offices, HUD/OIG nonetheless voluntarily publishes the following cost-benefit analysis of its plan...

  10. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  11. 77 FR 43086 - Solicitation of Written Comments on Draft Phase 3 Long-Term Care Facilities Strategy/Module for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Solicitation of Written Comments on Draft Phase 3 Long-Term Care Facilities Strategy/Module for Inclusion in the National Action Plan To Prevent Healthcare-Associated Infections: Roadmap to Elimination AGENCY: Department of Health and Human Services, Office of the...

  12. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Spill response plans for facilities located in...

  13. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  14. Perception of Water-Based Masking Sounds-Long-Term Experiment in an Open-Plan Office.

    PubMed

    Hongisto, Valtteri; Varjo, Johanna; Oliva, David; Haapakangas, Annu; Benway, Evan

    2017-01-01

    A certain level of masking sound is necessary to control the disturbance caused by speech sounds in open-plan offices. The sound is usually provided with evenly distributed loudspeakers. Pseudo-random noise is often used as a source of artificial sound masking (PRMS). A recent laboratory experiment suggested that water-based masking sound (WBMS) could be more favorable than PRMS. The purpose of our study was to determine how the employees perceived different WBMSs compared to PRMS. The experiment was conducted in an open-plan office of 77 employees who had been accustomed to work under PRMS (44 dB L Aeq ). The experiment consisted of five masking conditions: the original PRMS, four different WBMSs and return to the original PRMS. The exposure time of each condition was 3 weeks. The noise level was nearly equal between the conditions (43-45 dB L Aeq ) but the spectra and the nature of the sounds were very different. A questionnaire was completed at the end of each condition. Acoustic satisfaction was worse during the WBMSs than during the PRMS. The disturbance caused by three out of four WBMSs was larger than that of PRMS. Several attributes describing the sound quality itself were in favor of PRMS. Colleagues' speech sounds disturbed more during WBMSs. None of the WBMSs produced better subjective ratings than PRMS. Although the first WBMS was equal with the PRMS for several variables, the overall results cannot be seen to support the use of WBMSs in office workplaces. Because the experiment suffered from some methodological weaknesses, conclusions about the adequacy of WBMSs cannot yet be drawn.

  15. Perception of Water-Based Masking Sounds—Long-Term Experiment in an Open-Plan Office

    PubMed Central

    Hongisto, Valtteri; Varjo, Johanna; Oliva, David; Haapakangas, Annu; Benway, Evan

    2017-01-01

    A certain level of masking sound is necessary to control the disturbance caused by speech sounds in open-plan offices. The sound is usually provided with evenly distributed loudspeakers. Pseudo-random noise is often used as a source of artificial sound masking (PRMS). A recent laboratory experiment suggested that water-based masking sound (WBMS) could be more favorable than PRMS. The purpose of our study was to determine how the employees perceived different WBMSs compared to PRMS. The experiment was conducted in an open-plan office of 77 employees who had been accustomed to work under PRMS (44 dB LAeq). The experiment consisted of five masking conditions: the original PRMS, four different WBMSs and return to the original PRMS. The exposure time of each condition was 3 weeks. The noise level was nearly equal between the conditions (43–45 dB LAeq) but the spectra and the nature of the sounds were very different. A questionnaire was completed at the end of each condition. Acoustic satisfaction was worse during the WBMSs than during the PRMS. The disturbance caused by three out of four WBMSs was larger than that of PRMS. Several attributes describing the sound quality itself were in favor of PRMS. Colleagues' speech sounds disturbed more during WBMSs. None of the WBMSs produced better subjective ratings than PRMS. Although the first WBMS was equal with the PRMS for several variables, the overall results cannot be seen to support the use of WBMSs in office workplaces. Because the experiment suffered from some methodological weaknesses, conclusions about the adequacy of WBMSs cannot yet be drawn. PMID:28769834

  16. Office of Command Security Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    outlines the Office of Command Security instruction for TQM implementation. Keywords: TQM (Total Quality Management ), DLA Office of Command Security, Continuous process improvement, Automatic data processing security.

  17. LPT. Shield test facility (TAN646). Floor plan for water treatment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-646). Floor plan for water treatment room on west facade, tank and filter locations in basement along service tunnel and in coupling station. Ralph M. Parsons 1229-17 ANP/GE-6-646-P-2. April 1957. INEEL Index code no. 037-0645/0646-51-693-107387 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  18. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less

  19. A spatial national health facility database for public health sector planning in Kenya in 2008.

    PubMed

    Noor, Abdisalan M; Alegana, Victor A; Gething, Peter W; Snow, Robert W

    2009-03-06

    Efforts to tackle the enormous burden of ill-health in low-income countries are hampered by weak health information infrastructures that do not support appropriate planning and resource allocation. For health information systems to function well, a reliable inventory of health service providers is critical. The spatial referencing of service providers to allow their representation in a geographic information system is vital if the full planning potential of such data is to be realized. A disparate series of contemporary lists of health service providers were used to update a public health facility database of Kenya last compiled in 2003. These new lists were derived primarily through the national distribution of antimalarial and antiretroviral commodities since 2006. A combination of methods, including global positioning systems, was used to map service providers. These spatially-referenced data were combined with high-resolution population maps to analyze disparity in geographic access to public health care. The updated 2008 database contained 5,334 public health facilities (67% ministry of health; 28% mission and nongovernmental organizations; 2% local authorities; and 3% employers and other ministries). This represented an overall increase of 1,862 facilities compared to 2003. Most of the additional facilities belonged to the ministry of health (79%) and the majority were dispensaries (91%). 93% of the health facilities were spatially referenced, 38% using global positioning systems compared to 21% in 2003. 89% of the population was within 5 km Euclidean distance to a public health facility in 2008 compared to 71% in 2003. Over 80% of the population outside 5 km of public health service providers was in the sparsely settled pastoralist areas of the country. We have shown that, with concerted effort, a relatively complete inventory of mapped health services is possible with enormous potential for improving planning. Expansion in public health care in Kenya has

  20. 48 CFR 7.204 - Responsibilities of contracting officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Responsibilities of... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Planning for the Purchase of Supplies in Economic Quantities 7.204 Responsibilities of contracting officers. (a) Contracting officers are responsible for...

  1. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Spill response plans for facilities located in...

  2. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Spill response plans for facilities located in...

  3. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Spill response plans for facilities located in...

  4. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Spill response plans for facilities located in...

  5. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only

  6. 77 FR 52318 - Notice of Submission for OMB Review; Office of Planning, Evaluation and Policy Development; Study...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Office of Planning, Evaluation and..., including technical assistance to improve the quality of evaluations and performance reporting; and how to.... Department of Education, 400 Maryland Avenue SW., LBJ, Washington, DC 20202-4537. Copies of the proposed...

  7. 77 FR 52707 - Notice of Submission for OMB Review; Office of Planning, Evaluation and Policy Development; Study...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Office of Planning, Evaluation and..., including technical assistance to improve the quality of evaluations and performance reporting; and how to.... Department of Education, 400 Maryland Avenue SW, LBJ, Washington, DC 20202-4537. Copies of the proposed...

  8. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  9. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  10. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  11. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  12. 48 CFR 833.212 - Contracting officer's duties upon appeal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction contracts administered by the Office of Construction and Facilities Management, copies of the... sent to the Director, Office of Construction and Facilities Management.) (b) Within 20 days of receipt... parties pertinent to the appeal, including the letter or letters of claim in response to which the...

  13. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  14. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  16. 40 CFR 355.10 - Must my facility comply with the emergency planning requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Must my facility comply with the emergency planning requirements of this subpart? 355.10 Section 355.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  17. Data Management Facility Operations Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  18. Stennis cuts ribbon on records retention facility

    NASA Image and Video Library

    2010-08-24

    NASA's John C. Stennis Space Center cut the ribbon Aug. 24 on a new, storm-resistant Records Retention Facility that consolidates and protects records storage at the nation's premier rocket engine test facility. This facility will also house history office operations. Participants in the ribbon-cutting included: (l to r) Gay Irby, Center Operations deputy director at Stennis; Linda Cureton, NASA chief information officer; Patrick Scheuermann, Stennis director; Jane Odom, NASA chief archivist; Dinna Cottrell, Stennis chief information officer; and James Cluff, Stennis records manager.

  19. Oral healthcare access and adequacy in alternative long-term care facilities.

    PubMed

    Smith, Barbara J; Ghezzi, Elisa M; Manz, Michael C; Markova, Christiana P

    2010-01-01

    This study was undertaken to determine practices and perceived barriers to access related to oral health by surveying administrators in Michigan alternative long-term care facilities (ALTCF). A 24-item questionnaire was mailed to all 2,275 Michigan ALTCF serving residents aged 60+. Facility response rate was 22% (n = 508). Eleven percent of facilities had a written dental care plan; 18% stated a dentist examined new residents; and 19% of facilities had an agreement with a dentist to come to the facility, with 52% of those being for emergency care only. The greatest perceived barriers were willingness of general and specialty dentists to treat residents at the nursing facility and/or private offices as well as financial concerns. Substantial barriers to care were uniformly perceived. Oral health policies and practices within Michigan ALTCF vary, as measured by resources, attitudes, and the availability of professional care. There is limited involvement by dental professionals in creating policy and providing consultation and service.

  20. Interactive Office user's manual

    NASA Technical Reports Server (NTRS)

    Montgomery, Edward E.; Lowers, Benjamin; Nabors, Terri L.

    1990-01-01

    Given here is a user's manual for Interactive Office (IO), an executive office tool for organization and planning, written specifically for Macintosh. IO is a paperless management tool to automate a related group of individuals into one productive system.

  1. Facilities Utilization Program Implementation Handbook

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This Facilities Utilization Program Implementation Handbook (FUPIH) prescribes procedures for the review and the reporting on the utilization of NASA facilities. The Directors of NASA Field Installations should designate an Installation Official responsible for coordinating the assignment of buildings space and implementing the facilities utilization reviews and annual report preparation. The individual designated shall be known as the 'Facilities Utilization Officer (FUO).' Functional responsibilities of the FUO are detailed in NASA Management Instruction (NMI) 7234.1. It is recognized that titles used in the implementation of the Facilities Utilization Program may vary between field installations. The Facilities Utilization Program (FUP) is designed to provide a uniform and orderly process for meeting or addressing the following objectives: the establishment of sound facilities requirements to meet NASA's programmatic and institutional needs; the optimum allocation of available facilities and related resources to meet these requirements; and the early identification and request for required additional facilities resources. The detailed review and reporting system enacted by NMI 7234.1 should encourage more comprehensive utilization planning for all NASA facilities and ensure, to the maximum extent practicable, that all such facilities are put to their highest and best use consistent with NASA programmatic and institutional priorities. A principal purpose of the FUP is the early identification of NASA facilities which may be or may become underutilized or excess to NASA needs and to provide a timely reference point from which corrective actions (i.e., consolidation, elimination of duplication, improved utilization of disposal) may be taken. Because the supply of this handbook is limited, distribution should be controlled at the field installation level.

  2. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lombard, K.H.

    1994-08-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing newmore » and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.« less

  3. 47 CFR 0.21 - Functions of the Office.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Functions of the Office. 0.21 Section 0.21... Planning and Policy Analysis § 0.21 Functions of the Office. The Office of Strategic Planning and Policy..., position papers, proposed Commission actions, or other agenda items as appropriate; (g) To manage the...

  4. 47 CFR 0.21 - Functions of the Office.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Functions of the Office. 0.21 Section 0.21... Planning and Policy Analysis § 0.21 Functions of the Office. The Office of Strategic Planning and Policy..., position papers, proposed Commission actions, or other agenda items as appropriate; (g) To manage the...

  5. 47 CFR 0.21 - Functions of the Office.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Functions of the Office. 0.21 Section 0.21... Planning and Policy Analysis § 0.21 Functions of the Office. The Office of Strategic Planning and Policy..., position papers, proposed Commission actions, or other agenda items as appropriate; (g) To manage the...

  6. 48 CFR 908.7103 - Office machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Office machines. 908.7103... PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7103 Office machines. Acquisitions of office machines by DOE offices and its authorized contractors shall be in accordance with FPMR...

  7. SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipriani, Ralph J.

    2014-12-01

    Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

  8. Nuclear reactors built, being built, or planned 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    This publication contains unclassified information about facilities, built, being built, or planned in the United States for domestic use or export as of December 31, 1996. The Office of Scientific and Technical Information, U.S. Department of Energy, gathers this information annually from Washington headquarters, and field offices of DOE; from the U.S. Nuclear Regulatory Commission (NRC); from the U. S. reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from U.S. and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables ofmore » the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled.« less

  9. Planning of public healthcare facility using a location allocation modelling: A case study

    NASA Astrophysics Data System (ADS)

    Shariff, S. Sarifah Radiah; Moin, Noor Hasnah; Omar, Mohd

    2014-09-01

    Finding the correct location of any facility and determining the demands which are to be assigned to it is very crucial in public health service. This is to ensure that the public gain maximum benefits. This article analyzes the previous location decisions of public primary healthcare (PHC) facilities in the district of Kuala Langat, Malaysia. With total population of 220214 (in 2010), the PHC in the district is currently served by 28 facilities. The percentages of total population covered (in 2007) within the maximum allowable distance of 3km and 5km are 69.7 percent and 77.8 percent respectively. This is very low compared to the Malaysian National Health Policy of Health for All or 100 percent coverage. The determination of health facility location should be planned carefully to further increase effective primary health service to the nation that is required for economic sustainability.

  10. Indoor Lighting Facilities

    NASA Astrophysics Data System (ADS)

    Matsushima, Koji; Saito, Yoshinori; Ichikawa, Shigenori; Kawauchi, Takao; Tanaka, Tsuneo; Hirano, Rika; Tazuke, Fuyuki

    According to the statistics by the Ministry of Land, Infrastructure and Transport, the total floor space of all building construction started was 188.87 million m2 (1.5% increase y/y), marking the fourth straight year of increase. Many large-scale buildings under construction in central Tokyo become fully occupied by tenants before completion. As for office buildings, it is required to develop comfortable and functional office spaces as working styles are becoming more and more diversified, and lighting is also an element of such functionalities. The total floor space of construction started for exhibition pavilions, multipurpose halls, conference halls and religious architectures decreased 11.1% against the previous year. This marked a decline for 10 consecutive years and the downward trend continues. In exhibition pavilions, the light radiation is measured and adjusted throughout the year so as not to damage the artworks by lighting. Hospitals, while providing higher quality medical services and enhancing the dwelling environment of patients, are expected to meet various restrictions and requirements, including the respect for privacy. Meanwhile, lighting designs for school classrooms tend to be homogeneous, yet new ideas are being promoted to strike a balance between the economical and functional aspects. The severe economic environment continues to be hampering the growth of theaters and halls in both the private and public sectors. Contrary to the downsizing trend of such facilities, additional installations of lighting equipment were conspicuous, and the adoption of high efficacy lighting appliances and intelligent function control circuits are becoming popular. In the category of stores/commercial facilities, the construction of complex facilities is a continuing trend. Indirect lighting, high luminance discharge lamps with excellent color rendition and LEDs are being effectively used in these facilities, together with the introduction of lighting designs

  11. Master Plan for Educational Facilities: City of Clifton, Passaic County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Clifton, New Jersey, has a land area of just under 12 square miles with a population estimated in 1976 to be 83,592 persons. This master plan for educational facilities begins with an overview of the district and its historical background. A number of maps illustrate characteristics of the area, including its topography, relationship to key…

  12. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. Implementation of diffraction in a ray-tracing model for the prediction of noise in open-plan offices.

    PubMed

    Chevret, P; Chatillon, J

    2012-11-01

    Sound prediction in open-plan offices is a real challenge because of the complexity of the layout of such offices, and therefore because of the multitude of acoustic phenomena involved. One such phenomenon, of primary importance, and not the least challenging of them, is the diffraction by screens and low dividers that usually partition the workspace. This paper describes implementing the equations of the Uniform Theory of Diffraction [McNamara et al. (1990). Introduction to the Uniform Theory of Diffraction (Artech House, Boston)] in an existing ray-tracing model initially dedicated to sound prediction in industrial premises. For the purposes of validation, a series of measurements was conducted in a semi-anechoic chamber in the same manner as Wang and Bradley [(2002). Appl. Acoust. 63, 849-866] but including real desktops instead of single screens. A first phase was dedicated to controlling the quality of the installation by making comparisons with McNamara's solution for a single screen on a rigid floor. Then, the validation itself was conducted with measurements on real desktops, first without a ceiling, and then with a rigid ceiling suspended above the double desk. The results of the comparisons between calculations and measurements in this configuration have demonstrated that the model is an effective tool for predicting sound levels in an open-plan office.

  14. Preliminary plan for testing a thermionic reactor in the Plum Brook Space Power Facility

    NASA Technical Reports Server (NTRS)

    Haley, F. A.

    1972-01-01

    A preliminary plan is presented for testing a thermionic reactor in the Plum Brook Space Power Facility (SPF). A technical approach, cost estimate, manpower estimate, and schedule are presented to cover a 2 year full power reactor test.

  15. 76 FR 23757 - Approval and Promulgation of Air Quality Implementation Plans; Infrastructure SIP Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... Regional Office normal hours of operation, and special arrangements should be made for deliveries of boxed... emissions during SSM of operations at facilities. EPA plans to address such State regulations in the future... result from crushing or grinding operations, and can come from dust on paved or unpaved roads as well...

  16. 75 FR 8739 - Notice of Intent To Prepare a Resource Management Plan for the Uncompahgre Field Office and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCOS05000 2009] Notice of Intent To Prepare a Resource Management Plan for the Uncompahgre Field Office and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with...

  17. Proceedings of the Annual Meeting of the Association of Higher Education Facilities Officers (86th, Cincinnati, OH, June 20-22, 1999).

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    This proceedings document presents the texts of 11 papers presented at the 1999 annual meeting of the Association of Higher Education Facilities Officers. The papers are: (1) "Is There a Pot of Gold at the End of the Rainbow?" (James J. Sebesta, Charles Strutz, and Frank Brewer); (2) "Preparing for Y2K" (Joe Spoonemore, Michael Montgomery, and…

  18. Planning School Library Media Center Facilities for New Hampshire and Vermont. Vermont Edition.

    ERIC Educational Resources Information Center

    Snider, Susan C.; Schubert, Leda

    This booklet provides guidelines and suggestions for planning school library media facilities. The intended audience is library media specialists; however, it is expected that administrators and architects may also find it useful. The importance of helping the architect understand the school media center's unique mission and relevant educational…

  19. Advantages of the incoherent uniform theory of diffraction for acoustic calculations in open-plan offices.

    PubMed

    Chevret, P

    2015-01-01

    Sound prediction in open-plan offices is a real challenge for room acoustics models because of the large dimensions involved and because of the complexity of the interior layout. For these reasons, the geometrical theory, based on a high frequency hypothesis, is often cited as an advantageous solution. Two types of approaches are, in general, developed under this hypothesis: the phase-included approach and the energy-based or "incoherent" approach. In this paper, comparisons are presented between calculations performed using these two approaches and measurements conducted in the laboratory where workstations were separated by low dividers and placed under ceilings that were absorbent to various extents. Particular attention was paid to processing diffraction using the uniform theory of diffraction. Narrow-band comparisons between calculations and measurements show that the phase-included model is flawed at low frequencies whenever the characteristic dimensions of the elements of the room (desk, low divider, etc.) are of the same order of magnitude as the wavelength. Conversely, the incoherent formulation, which removes the part played by the interference, gives results at least as accurate, be it in octave band or overall. Boasting very short computation times, the incoherent approach opens up interesting prospects for acoustic predictions in large open-plan offices.

  20. Facilities for Study and Research in the Offices of the United States Government at Washington. Bulletin, 1909, No. 1. Whole Number 398

    ERIC Educational Resources Information Center

    Hadley, Arthur Twining

    1909-01-01

    This bulletin contains a report prepared by President Hadley of Yale University on the facilities for advanced study and research in the offices of the National Government at Washington. Especial interest attaches to this publication. It sets forth, in compact form, information which has frequently been sought by institutions and individuals…