Sample records for facility acrf fixed

  1. ACRF Instrumentation Status: New, Current, and Future - January 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AS Koontz; S Choudhury; BD Ermold

    2008-01-31

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  2. ACRF Ingest Software Status: New, Current, and Future - April 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AS Koontz; S Choudhury; BD Ermold

    2008-04-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  3. ACRF Ingest Software Status: New, Current, and Future (September 2007)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, AS; Choudhury, S; Ermold, BD

    2007-04-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  4. ACRF Ingest Software Status: New, Current, and Future - May 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AS Koontz; S Choudhury; BD Ermold

    2008-05-01

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  5. ACRF Instrumentation Status: New, Current, and Future - October – November 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JW Voyles

    2007-11-30

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) SBIR instrument development.

  6. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-03-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period October 1 through December 31, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The first quarter comprises a total of 2,208 hours. For all fixed sites, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the first quarter of fiscal year (FY) 2007. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. NIM represents the AMF statistics for the current deployment in Niamey, Niger, Africa. PYE represents the AMF statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be

  7. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-05-22

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the

  8. The Status of the ACRF Millimeter Wave Cloud Radars (MMCRs), the Path Forward for Future MMCR Upgrades, the Concept of 3D Volume Imaging Radar and the UAV Radar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P Kollias; MA Miller; KB Widener

    2005-12-30

    The United States (U.S.) Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) operates millimeter wavelength cloud radars (MMCRs) in several climatological regimes. The MMCRs, are the primary observing tool for quantifying the properties of nearly all radiatively important clouds over the ACRF sites. The first MMCR was installed at the ACRF Southern Great Plains (SGP) site nine years ago and its original design can be traced to the early 90s. Since then, several MMCRs have been deployed at the ACRF sites, while no significant hardware upgrades have been performed. Recently, a two-stage upgrade (first C-40 Digitalmore » Signal Processors [DSP]-based, and later the PC-Integrated Radar AcQuisition System [PIRAQ-III] digital receiver) of the MMCR signal-processing units was completed. Our future MMCR related goals are: 1) to have a cloud radar system that continues to have high reliability and uptime and 2) to suggest potential improvements that will address increased sensitivity needs, superior sampling and low cost maintenance of the MMCRs. The Traveling Wave Tube (TWT) technology, the frequency (35-GHz), the radio frequency (RF) layout, antenna, the calibration and radar control procedure and the environmental enclosure of the MMCR remain assets for our ability to detect the profile of hydrometeors at all heights in the troposphere at the ACRF sites.« less

  9. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. L. Sisterson

    2010-01-12

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  10. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-01-24

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in

  11. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-10-08

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers

  12. ARM Climate Research Facility: Outreach Tools and Strategies

    NASA Astrophysics Data System (ADS)

    Roeder, L.; Jundt, R.

    2009-12-01

    Sponsored by the Department of Energy, the ARM Climate Research Facility is a global scientific user facility for the study of climate change. To publicize progress and achievements and to reach new users, the ACRF uses a variety of Web 2.0 tools and strategies that build off of the program’s comprehensive and well established News Center (www.arm.gov/news). These strategies include: an RSS subscription service for specific news categories; an email “newsletter” distribution to the user community that compiles the latest News Center updates into a short summary with links; and a Facebook page that pulls information from the News Center and links to relevant information in other online venues, including those of our collaborators. The ACRF also interacts with users through field campaign blogs, like Discovery Channel’s EarthLive, to share research experiences from the field. Increasingly, field campaign Wikis are established to help ACRF researchers collaborate during the planning and implementation phases of their field studies and include easy to use logs and image libraries to help record the campaigns. This vital reference information is used in developing outreach material that is shared in highlights, news, and Facebook. Other Web 2.0 tools that ACRF uses include Google Maps to help users visualize facility locations and aircraft flight patterns. Easy-to-use comment boxes are also available on many of the data-related web pages on www.arm.gov to encourage feedback. To provide additional opportunities for increased interaction with the public and user community, future Web 2.0 plans under consideration for ACRF include: evaluating field campaigns for Twitter and microblogging opportunities, adding public discussion forums to research highlight web pages, moving existing photos into albums on FlickR or Facebook, and building online video archives through YouTube.

  13. Fixed-facility workplace screening mammography.

    PubMed

    Reynolds, H E; Larkin, G N; Jackson, V P; Hawes, D R

    1997-02-01

    Potential barriers to compliance with screening mammography guidelines include the cost and inconvenience involved with undergoing the procedure. Workplace screening with mobile mammography is one possible approach to the convenience barrier. However, fixed-facility workplace screening is a viable alternative for any company with a large workforce in one location. This paper describes our initial experience with one such fixed facility. The facility was a cooperative venture by a large pharmaceutical company and an academic radiology department to provide convenient, no-cost (to the patient) screening mammography to employees, dependents, and retirees more than 40 years old. The pharmaceutical company built the facility within its corporate headquarters and the academic radiology department provided the equipment and personnel. The company was billed a fixed cost per examination. In the first 22 months of operation, 4210 (of 4559 scheduled) screening mammograms were obtained. The mean age of the population was 53 years old. Ninety percent of the screening mammograms were interpreted as negative or benign; 10% required additional workup. Of the screened population, 62 biopsies were recommended and 60 were performed. Of these, 42 were benign and 18 malignant. The cancer detection rate was 4.3 per 1000 (0.43%). At the time of diagnosis, six patients were stage 0, 10 patients were stage I, one patient was stage II, and one patient was stage III. Eleven of the 18 patients had minimal cancers. Of the patients who completed a satisfaction survey, 97% percent expressed a high degree of satisfaction with the screening process and stated they would use the facility in the future. A fixed facility for workplace screening mammography is a viable way to provide nearly barrier-free access to high-quality mammography. Patient acceptance is high.

  14. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the

  15. Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-07-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore

  16. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-10-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments

  17. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is

  18. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, DL

    2008-09-30

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  19. Validation of aerosol extinction and water vapor profiles from routine Atmospheric Radiation Measurement Program Climate Research Facility measurements

    NASA Astrophysics Data System (ADS)

    Schmid, Beat; Flynn, Connor J.; Newsom, Rob K.; Turner, David D.; Ferrare, Richard A.; Clayton, Marian F.; Andrews, Elisabeth; Ogren, John A.; Johnson, Roy R.; Russell, Philip B.; Gore, Warren J.; Dominguez, Roseanne

    2009-11-01

    The accuracy with which vertical profiles of aerosol extinction σep(λ) can be measured using routine Atmospheric Radiation Measurement Program (ARM) Climate Research Facility (ACRF) measurements and was assessed using data from two airborne field campaigns, the ARM Aerosol Intensive Operation Period (AIOP, May 2003), and the Aerosol Lidar Validation Experiment (ALIVE, September 2005). This assessment pertains to the aerosol at its ambient concentration and thermodynamic state (i.e., σep(λ) either free of or corrected for sampling artifacts) and includes the following ACRF routine methods: Raman lidar, micropulse lidar (MPL), and in situ aerosol profiles (IAP) with a small aircraft. Profiles of aerosol optical depth τp(λ), from which the profiles of σep(λ) are derived through vertical differentiation, were measured by the NASA Ames Airborne Tracking 14-channel Sun photometer (AATS-14); these data were used as benchmark in this evaluation. The ACRF IAP σep(550 nm) were lower by 11% (during AIOP) and higher by 1% (during ALIVE) when compared to AATS-14. The ACRF MPL σep(523 nm) measurements were higher by 24% (AIOP) and 19-21% (ALIVE) compared to AATS-14, but the correlation improved significantly during ALIVE. In the AIOP, a second MPL operated by NASA showed a smaller positive bias (13%) with respect to AATS-14. The ACRF Raman lidar σep(355 nm) measurements were larger by 54% (AIOP) and by 6% (ALIVE) compared to AATS-14. The large bias in the Raman lidar measurements during AIOP stemmed from a gradual loss of Raman lidar sensitivity starting about the end of 2001 going unnoticed until after AIOP. A major refurbishment and upgrade of the instrument and improvements to a data processing algorithm led to the significant improvement and very small bias in ALIVE. Finally, we find that during ALIVE the Raman lidar water vapor densities ρw are 8% larger when compared to AATS-14, whereas in situ measured ρw aboard two different aircraft are smaller than the

  20. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-04-23

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  1. Mobile Versus Fixed Facility: Latinas' Attitudes and Preferences for Obtaining a Mammogram.

    PubMed

    Scheel, John R; Tillack, Allison A; Mercer, Lauren; Coronado, Gloria D; Beresford, Shirley A A; Molina, Yamile; Thompson, Beti

    2018-01-01

    Mobile mammographic services have been proposed as a way to reduce Latinas' disproportionate late-stage presentation compared with white women by increasing their access to mammography. The aims of this study were to assess why Latinas may not use mobile mammographic services and to explore their preferences after using these services. Using a mixed-methods approach, a secondary analysis was conducted of baseline survey data (n = 538) from a randomized controlled trial to improve screening mammography rates among Latinas in Washington. Descriptive statistics and bivariate regression were used to characterize mammography location preferences and to test for associations with sociodemographic indices, health care access, and perceived breast cancer risk and beliefs. On the basis of these findings, a qualitative study (n = 18) was used to explore changes in perceptions after using mobile mammographic services. More Latinas preferred obtaining a mammogram at a fixed facility (52.3% [n = 276]) compared with having no preference (46.3% [n = 249]) and preferring mobile mammographic services (1.7% [n = 9]). Concerns about privacy and comfort (15.6% [n = 84]) and about general quality (10.6% [n = 57]) were common reasons for preferring a fixed facility. Those with no history of mammography preferred a fixed facility (P < .05). In the qualitative study, Latinas expressed similar initial concerns but became positive toward the mobile mammographic services after obtaining a mammogram. Although most Latinas preferred obtaining a mammogram at a fixed facility, positive experiences with mobile mammography services changed their attitudes toward them. These findings highlight the need to include community education when using mobile mammographic service to increase screening mammography rates in underserved communities. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  2. Atmospheric Radiation Measurement program climate research facility operations quarterly report April 1 - June 30, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-07-26

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of

  3. Unequal-area, fixed-shape facility layout problems using the firefly algorithm

    NASA Astrophysics Data System (ADS)

    Ingole, Supriya; Singh, Dinesh

    2017-07-01

    In manufacturing industries, the facility layout design is a very important task, as it is concerned with the overall manufacturing cost and profit of the industry. The facility layout problem (FLP) is solved by arranging the departments or facilities of known dimensions on the available floor space. The objective of this article is to implement the firefly algorithm (FA) for solving unequal-area, fixed-shape FLPs and optimizing the costs of total material handling and transportation between the facilities. The FA is a nature-inspired algorithm and can be used for combinatorial optimization problems. Benchmark problems from the previous literature are solved using the FA. To check its effectiveness, it is implemented to solve large-sized FLPs. Computational results obtained using the FA show that the algorithm is less time consuming and the total layout costs for FLPs are better than the best results achieved so far.

  4. An airborne intensive care facility (fixed wing).

    PubMed

    Gilligan, J E; Goon, P; Maughan, G; Griggs, W; Haslam, R; Scholten, A

    1996-04-01

    A fixed-wing aircraft (Beechcraft KingAir B200 C) fitted as an airborne intensive care facility is described. It completed 2000 missions from 1987-1992 for distances up to 1300 km. Features include: 1. Space for carriage of two stretchers, medical cabin crew of up to five persons and equipment and two-pilot operation if necessary. A third stretcher may be carried in emergencies. 2. Two CARDIOCAP (TM) fixed monitors for ECG, invasive and noninvasive pressures pulse oximetry and end-tidal C02 plus SIEMENS 630(TM)/PROPAQ(TM) compact monitors for the ground transport phase of missions, or the total duration. 3. A medical oxygen reservoir of 4650 litres sufficient for two patients on IPPV with FiO2 = 1.0 for a four-hour trip. The medical suction system is powered from the engine or a vacuum pump. 4. Other medical equipment and drugs in portable packs, for ground transport and resuscitation needs and for replenishment by nursing staff at the parent hospitals. 5. Stretchers compatible with helicopter and road ambulance vehicles used. 6. A stretcher loading device energized from the aircraft, operating through a wide (cargo) door. 7. Provision of 24Ov AC (alternating current) and 28v DC (direct current) electrical energy. 8. Pressurization and climate control. 9. Satisfactory aviation performance for conditions encountered, with single-pilot operation.

  5. Fixed Base Modal Testing Using the NASA GRC Mechanical Vibration Facility

    NASA Technical Reports Server (NTRS)

    Staab, Lucas D.; Winkel, James P.; Suarez, Vicente J.; Jones, Trevor M.; Napolitano, Kevin L.

    2016-01-01

    The Space Power Facility at NASA's Plum Brook Station houses the world's largest and most powerful space environment simulation facilities, including the Mechanical Vibration Facility (MVF), which offers the world's highest-capacity multi-axis spacecraft shaker system. The MVF was designed to perform sine vibration testing of a Crew Exploration Vehicle (CEV)-class spacecraft with a total mass of 75,000 pounds, center of gravity (cg) height above the table of 284 inches, diameter of 18 feet, and capability of 1.25 gravity units peak acceleration in the vertical and 1.0 gravity units peak acceleration in the lateral directions. The MVF is a six-degree-of-freedom, servo-hydraulic, sinusoidal base-shake vibration system that has the advantage of being able to perform single-axis sine vibration testing of large structures in the vertical and two lateral axes without the need to reconfigure the test article for each axis. This paper discusses efforts to extend the MVF's capabilities so that it can also be used to determine fixed base modes of its test article without the need for an expensive test-correlated facility simulation.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    AS Koontz; S Choudhury; BD Ermold

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF). The report is divided into four sections: (1) news about ingests currently under development, (2) current production ingests, (3) future ingest development plans, and (4) information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, AS; Choudhury, S; Ermold, BD: Gaustad, KL

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  8. The effects of atmospheric cloud radiative forcing on climate

    NASA Technical Reports Server (NTRS)

    Randall, David A.

    1989-01-01

    In order to isolate the effects of atmospheric cloud radiative forcing (ACRF) on climate, the general circulation of an ocean-covered earth called 'Seaworld' was simulated using the Colorado State University GCM. Most current climate models, however, do not include an interactive ocean. The key simplifications in 'Seaworld' are the fixed boundary temperature with no land points, the lack of mountains and the zonal uniformity of the boundary conditions. Two 90-day 'perpetual July' simulations were performed and analyzed the last sixty days of each. The first run included all the model's physical parameterizations, while the second omitted the effects of clouds in both the solar and terrestrial radiation parameterizations. Fixed and identical boundary temperatures were set for the two runs, and resulted in differences revealing the direct and indirect effects of the ACRF on the large-scale circulation and the parameterized hydrologic processes.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    AS Koontz; S Choudhury; BD Ermold

    The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production ingests, (3) for future ingest development plans, and (4) for information on retired ingests. Please note that datastreams beginning in “xxx” indicate cases where ingests run at multiple ACRF sites, which results in a datastream(s) for each location.

  10. 40 CFR 113.4 - Size classes and associated liability limits for fixed onshore oil storage facilities, 1,000...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Size classes and associated liability limits for fixed onshore oil storage facilities, 1,000 barrels or less capacity. 113.4 Section 113.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS LIABILITY LIMITS FOR...

  11. 40 CFR 113.4 - Size classes and associated liability limits for fixed onshore oil storage facilities, 1,000...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Size classes and associated liability limits for fixed onshore oil storage facilities, 1,000 barrels or less capacity. 113.4 Section 113.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS LIABILITY LIMITS FOR...

  12. Contributions of the Atmospheric Radiation Measurement (ARM) Program and the ARM Climate Research Facility to the U.S. Climate Change Science Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SA Edgerton; LR Roeder

    The Earth’s surface temperature is determined by the balance between incoming solar radiation and thermal (or infrared) radiation emitted by the Earth back to space. Changes in atmospheric composition, including greenhouse gases, clouds, and aerosols can alter this balance and produce significant climate change. Global climate models (GCMs) are the primary tool for quantifying future climate change; however, there remain significant uncertainties in the GCM treatment of clouds, aerosol, and their effects on the Earth’s energy balance. The 2007 assessment (AR4) by the Intergovernmental Panel on Climate Change (IPCC) reports a substantial range among GCMs in climate sensitivity to greenhousemore » gas emissions. The largest contributor to this range lies in how different models handle changes in the way clouds absorb or reflect radiative energy in a changing climate (Solomon et al. 2007). In 1989, the U.S. Department of Energy (DOE) Office of Science created the Atmospheric Radiation Measurement (ARM) Program within the Office of Biological and Environmental Research (BER) to address scientific uncertainties related to global climate change, with a specific focus on the crucial role of clouds and their influence on the transfer of radiation in the atmosphere. To address this problem, BER has adopted a unique two-pronged approach: * The ARM Climate Research Facility (ACRF), a scientific user facility for obtaining long-term measurements of radiative fluxes, cloud and aerosol properties, and related atmospheric characteristics in diverse climate regimes. * The ARM Science Program, focused on the analysis of ACRF data to address climate science issues associated with clouds, aerosols, and radiation, and to improve GCMs. This report describes accomplishments of the BER ARM Program toward addressing the primary uncertainties related to climate change prediction as identified by the IPCC.« less

  13. The effects of cloud radiative forcing on an ocean-covered planet

    NASA Technical Reports Server (NTRS)

    Randall, David A.

    1990-01-01

    Cumulus anvil clouds, whose importance has been emphasized by observationalists in recent years, exert a very powerful influence on deep tropical convection by tending to radiatively destabilize the troposphere. In addition, they radiatively warm the column in which they reside. Their strong influence on the simulated climate argues for a much more refined parameterization in the General Circulation Model (GCM). For Seaworld, the atmospheric cloud radiative forcing (ACRF) has a powerful influence on such basic climate parameters as the strength of the Hadley circulation, the existence of a single narrow InterTropical Convergence Zone (ITCZ), and the precipitable water content of the atmosphere. It seems likely, however, that in the real world the surface CRF feeds back negatively to suppress moist convection and the associated cloudiness, and so tends to counteract the effects of the ACRF. Many current climate models have fixed sea surface temperatures but variable land-surface temperatures. The tropical circulations of such models may experience a position feedback due to ACRF over the oceans, and a negative or weak feedback due to surface CRF over the land. The overall effects of the CRF on the climate system can only be firmly established through much further analysis, which can benefit greatly from the use of a coupled ocean-atmospheric model.

  14. Tools for Teaching Climate Change Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maestas, A.M.; Jones, L.A.

    2005-03-18

    The Atmospheric Radiation Measurement Climate Research Facility (ACRF) develops public outreach materials and educational resources for schools. Studies prove that science education in rural and indigenous communities improves when educators integrate regional knowledge of climate and environmental issues into school curriculum and public outreach materials. In order to promote understanding of ACRF climate change studies, ACRF Education and Outreach has developed interactive kiosks about climate change for host communities close to the research sites. A kiosk for the North Slope of Alaska (NSA) community was installed at the Iupiat Heritage Center in 2003, and a kiosk for the Tropical Westernmore » Pacific locales will be installed in 2005. The kiosks feature interviews with local community elders, regional agency officials, and Atmospheric Radiation Measurement (ARM) Program scientists, which highlight both research and local observations of some aspects of environmental and climatic change in the Arctic and Pacific. The kiosks offer viewers a unique opportunity to learn about the environmental concerns and knowledge of respected community elders, and to also understand state-of-the-art climate research. An archive of interviews from the communities will also be distributed with supplemental lessons and activities to encourage teachers and students to compare and contrast climate change studies and oral history observations from two distinct locations. The U.S. Department of Energy's ACRF supports education and outreach efforts for communities and schools located near its sites. ACRF Education and Outreach has developed interactive kiosks at the request of the communities to provide an opportunity for the public to learn about climate change from both scientific and indigenous perspectives. Kiosks include interviews with ARM scientists and provide users with basic information about climate change studies as well as interviews with elders and community leaders

  15. Improving Mixed-phase Cloud Parameterization in Climate Model with the ACRF Measurements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zhien

    Mixed-phase cloud microphysical and dynamical processes are still poorly understood, and their representation in GCMs is a major source of uncertainties in overall cloud feedback in GCMs. Thus improving mixed-phase cloud parameterizations in climate models is critical to reducing the climate forecast uncertainties. This study aims at providing improved knowledge of mixed-phase cloud properties from the long-term ACRF observations and improving mixed-phase clouds simulations in the NCAR Community Atmosphere Model version 5 (CAM5). The key accomplishments are: 1) An improved retrieval algorithm was developed to provide liquid droplet concentration for drizzling or mixed-phase stratiform clouds. 2) A new ice concentrationmore » retrieval algorithm for stratiform mixed-phase clouds was developed. 3) A strong seasonal aerosol impact on ice generation in Arctic mixed-phase clouds was identified, which is mainly attributed to the high dust occurrence during the spring season. 4) A suite of multi-senor algorithms was applied to long-term ARM observations at the Barrow site to provide a complete dataset (LWC and effective radius profile for liquid phase, and IWC, Dge profiles and ice concentration for ice phase) to characterize Arctic stratiform mixed-phase clouds. This multi-year stratiform mixed-phase cloud dataset provides necessary information to study related processes, evaluate model stratiform mixed-phase cloud simulations, and improve model stratiform mixed-phase cloud parameterization. 5). A new in situ data analysis method was developed to quantify liquid mass partition in convective mixed-phase clouds. For the first time, we reliably compared liquid mass partitions in stratiform and convective mixed-phase clouds. Due to the different dynamics in stratiform and convective mixed-phase clouds, the temperature dependencies of liquid mass partitions are significantly different due to much higher ice concentrations in convective mixed phase clouds. 6) Systematic

  16. Integrated Facilities Management and Fixed Asset Accounting.

    ERIC Educational Resources Information Center

    Golz, W. C., Jr.

    1984-01-01

    A record of a school district's assets--land, buildings, machinery, and equipment--can be a useful management tool that meets accounting requirements and provides appropriate information for budgeting, forecasting, and facilities management. (MLF)

  17. Facility and Laboratory Equipment | Energy Systems Integration Facility |

    Science.gov Websites

    Energy Systems Integration Facility is its infrastructure. In addition to extensive fixed laboratory . Photo of researchers testing building loads and power networks in the Systems Performance Laboratory

  18. Interactions among Radiation, Convection, and Large-Scale Dynamics in a General Circulation Model.

    NASA Astrophysics Data System (ADS)

    Randall, David A.; Harshvardhan; Dazlich, Donald A.; Corsetti, Thomas G.

    1989-07-01

    We have analyzed the effects of radiatively active clouds on the climate simulated by the UCLA/GLA GCM, with particular attention to the effects of the upper tropospheric stratiform clouds associated with deep cumulus convection, and the interactions of these clouds with convection and the large-scale circulation.Several numerical experiments have been performed to investigate the mechanisms through which the clouds influence the large-scale circulation. In the `NODETLQ' experiment, no liquid water or ice was detrained from cumulus clouds into the environment; all of the condensate was rained out. Upper level supersaturation cloudiness was drastically reduced, the atmosphere dried, and tropical outgoing longwave radiation increased. In the `NOANVIL' experiment, the radiative effects of the optically thich upper-level cloud sheets associated with deep cumulus convection were neglected. The land surface received more solar radiation in regions of convection, leading to enhanced surface fluxes and a dramatic increase in precipitation. In the `NOCRF' experiment, the longwave atmospheric cloud radiative forcing (ACRF) was omitted, paralleling the recent experiment of Slingo and Slingo. The results suggest that the ACRF enhances deep penetrative convection and precipitation, while suppressing shallow convection. They also indicate that the ACRF warms and moistens the tropical troposphere. The results of this experiment are somewhat ambiguous, however; for example, the ACRF suppresses precipitation in some parts of the tropics, and enhances it in others.To isolate the effects of the ACRF in a simpler setting, we have analyzed the climate of an ocean-covered Earth, which we call Seaworld. The key simplicities of Seaworld are the fixed boundary temperature with no land points, the lack of mountains, and the zonal uniformity of the boundary conditions. Results are presented from two Seaworld simulations. The first includes a full suite of physical parameterizations, while

  19. Fixed site neutralization model programmer's manual. Volume II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engi, D.; Chapman, L.D.; Judnick, W.

    This report relates to protection of nuclear materials at nuclear facilities. This volume presents the source listings for the Fixed Site Neutralization Model and its supporting modules, the Plex Preprocessor and the Data Preprocessor. (DLC)

  20. Co-C and Pd-C Fixed Points for the Evaluation of Facilities and Scales Realization at INRIM and NMC

    NASA Astrophysics Data System (ADS)

    Battuello, M.; Wang, L.; Girard, F.; Ang, S. H.

    2014-04-01

    Two hybrid cells for realizing the Co-C and Pd-C fixed points and constructed at Istituto Nazionale di Ricerca Metrologica (INRIM) were used for an evaluation of facilities and procedures adopted by INRIM and National Metrology Institute of Singapore (NMC) for the realization of the solid-liquid phase transitions of high-temperature fixed points and for determining their transition temperatures. Four different furnaces were used for the investigations, i.e., two single-zone furnaces, one of them of the direct-heating type, and two identical three-zone furnaces. The transition temperatures were measured at both institutes by adopting different procedures for realizing the radiation scales, i.e., at INRIM a scheme based on the extrapolation of fixed-point interpolated scales and an International Temperature Scale of 1990 (ITS-90) approach at NMC. The point of inflection (POI) of the melting curves was determined and assumed as a practical representation of the melting temperature. Different methods for deriving the POI were used, and differences as large as some hundredths of a kelvin were found with the different approaches. The POIs of the different melting curves were analyzed with respect to the different possible operative conditions with the aim of deriving reproducibility figures to improve the estimated uncertainty. As regard to the institutes inter-comparison, differences of 0.13 K and 0.29 K were found between INRIM and NMC determinations at the Co-C and Pd-C points, respectively. Such differences are compatible with the combined standard uncertainties of the comparison, which are estimated to be 0.33 K and 0.36 K at the Co-C and Pd-C points, respectively.

  1. High-NaCl diet impairs dynamic renal blood flow autoregulation in rats with adenine-induced chronic renal failure.

    PubMed

    Saeed, Aso; DiBona, Gerald F; Grimberg, Elisabeth; Nguy, Lisa; Mikkelsen, Minne Line Nedergaard; Marcussen, Niels; Guron, Gregor

    2014-03-15

    This study examined the effects of 2 wk of high-NaCl diet on kidney function and dynamic renal blood flow autoregulation (RBFA) in rats with adenine-induced chronic renal failure (ACRF). Male Sprague-Dawley rats received either chow containing adenine or were pair-fed an identical diet without adenine (controls). After 10 wk, rats were randomized to either remain on the same diet (0.6% NaCl) or to be switched to high 4% NaCl chow. Two weeks after randomization, renal clearance experiments were performed under isoflurane anesthesia and dynamic RBFA, baroreflex sensitivity (BRS), systolic arterial pressure variability (SAPV), and heart rate variability were assessed by spectral analytical techniques. Rats with ACRF showed marked reductions in glomerular filtration rate and renal blood flow (RBF), whereas mean arterial pressure and SAPV were significantly elevated. In addition, spontaneous BRS was reduced by ∼50% in ACRF animals. High-NaCl diet significantly increased transfer function fractional gain values between arterial pressure and RBF in the frequency range of the myogenic response (0.06-0.09 Hz) only in ACRF animals (0.3 ± 4.0 vs. -4.4 ± 3.8 dB; P < 0.05). Similarly, a high-NaCl diet significantly increased SAPV in the low-frequency range only in ACRF animals. To conclude, a 2-wk period of a high-NaCl diet in ACRF rats significantly impaired dynamic RBFA in the frequency range of the myogenic response and increased SAPV in the low-frequency range. These abnormalities may increase the susceptibility to hypertensive end-organ injury and progressive renal failure by facilitating pressure transmission to the microvasculature.

  2. Establishment of the Co-C Eutectic Fixed-Point Cell for Thermocouple Calibrations at NIMT

    NASA Astrophysics Data System (ADS)

    Ongrai, O.; Elliott, C. J.

    2017-08-01

    In 2015, NIMT first established a Co-C eutectic temperature reference (fixed-point) cell measurement capability for thermocouple calibration to support the requirements of Thailand's heavy industries and secondary laboratories. The Co-C eutectic fixed-point cell is a facility transferred from NPL, where the design was developed through European and UK national measurement system projects. In this paper, we describe the establishment of a Co-C eutectic fixed-point cell for thermocouple calibration at NIMT. This paper demonstrates achievement of the required furnace uniformity, the Co-C plateau realization and the comparison data between NIMT and NPL Co-C cells by using the same standard Pt/Pd thermocouple, demonstrating traceability. The NIMT measurement capability for noble metal type thermocouples at the new Co-C eutectic fixed point (1324.06°C) is estimated to be within ± 0.60 K (k=2). This meets the needs of Thailand's high-temperature thermocouple users—for which previously there has been no traceable calibration facility.

  3. Routine delivery of artemisinin-based combination treatment at fixed health facilities reduces malaria prevalence in Tanzania: an observational study

    PubMed Central

    2012-01-01

    Background Artemisinin-based combination therapy (ACT) has been promoted as a means to reduce malaria transmission due to their ability to kill both asexual blood stages of malaria parasites, which sustain infections over long periods and the immature derived sexual stages responsible for infecting mosquitoes and onward transmission. Early studies reported a temporal association between ACT introduction and reduced malaria transmission in a number of ecological settings. However, these reports have come from areas with low to moderate malaria transmission, been confounded by the presence of other interventions or environmental changes that may have reduced malaria transmission, and have not included a comparison group without ACT. This report presents results from the first large-scale observational study to assess the impact of case management with ACT on population-level measures of malaria endemicity in an area with intense transmission where the benefits of effective infection clearance might be compromised by frequent and repeated re-infection. Methods A pre-post observational study with a non-randomized comparison group was conducted at two sites in Tanzania. Both sites used sulphadoxine-pyrimethamine (SP) monotherapy as a first-line anti-malarial from mid-2001 through 2002. In 2003, the ACT, artesunate (AS) co-administered with SP (AS + SP), was introduced in all fixed health facilities in the intervention site, including both public and registered non-governmental facilities. Population-level prevalence of Plasmodium falciparum asexual parasitaemia and gametocytaemia were assessed using light microscopy from samples collected during representative household surveys in 2001, 2002, 2004, 2005 and 2006. Findings Among 37,309 observations included in the analysis, annual asexual parasitaemia prevalence in persons of all ages ranged from 11% to 28% and gametocytaemia prevalence ranged from <1% to 2% between the two sites and across the five survey years. A

  4. A review of the Fermilab fixed-target program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rameika, R.

    1994-12-01

    All eyes are now on the Fermilab collider program as the intense search for the top quark continues. Nevertheless, Fermilab`s long tradition of operating a strong, diverse physics program depends not only on collider physics but also on effective use of the facilities the Laboratory was founded on, the fixed-target beamlines. In this talk the author presents highlights of the Fermilab fixed-target program from its (not too distant) past, (soon to be) present, and (hopefully, not too distant) future program. The author concentrates on those experiments which are unique to the fixed-target program, in particular hadron structure measurements which usemore » the varied beams and targets available in this mode and the physics results from kaon, hyperon and high statistics charm experiments which are not easily accessible in high p{sub T} hadron collider detectors.« less

  5. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  6. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  7. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  8. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  9. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  10. MWRRET Value-Added Product: The Retrieval of Liquid Water Path and Precipitable Water Vapor from Microwave Radiometer (MWR) Datasets May 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaustad, KL; Turner, DD

    2009-05-30

    This report provides a short description of the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) microwave radiometer (MWR) RETrievel (MWRRET) value-added product (VAP) algorithm. This algorithm utilizes a complementary physical retrieval method and applies brightness temperature offsets to reduce spurious liquid water path (LWP) bias in clear skies resulting in significantly improved precipitable water vapor (PWV) and LWP retrievals. We present a general overview of the technique, input parameters, output products, and describe data quality checks. A more complete discussion of the theory and results is given in Turner et al. (2007b).

  11. Fixed point Open Ocean Observatory network (FixO3): Multidisciplinary observations from the air-sea interface to the deep seafloor

    NASA Astrophysics Data System (ADS)

    Lampitt, Richard; Cristini, Luisa

    2014-05-01

    Framework Directive and in support of the European Integrated Maritime Policy. The FixO3 network will provide free and open access to in situ fixed point data of the highest quality. It will provide a strong integrated framework of open ocean facilities in the Atlantic from the Arctic to the Antarctic and throughout the Mediterranean, enabling an integrated, regional and multidisciplinary approach to understand natural and anthropogenic change in the ocean.

  12. Fixed Base Modal Survey of the MPCV Orion European Service Module Structural Test Article

    NASA Technical Reports Server (NTRS)

    Winkel, James P.; Akers, J. C.; Suarez, Vicente J.; Staab, Lucas D.; Napolitano, Kevin L.

    2017-01-01

    Recently, the MPCV Orion European Service Module Structural Test Article (E-STA) underwent sine vibration testing using the multi-axis shaker system at NASA GRC Plum Brook Station Mechanical Vibration Facility (MVF). An innovative approach using measured constraint shapes at the interface of E-STA to the MVF allowed high-quality fixed base modal parameters of the E-STA to be extracted, which have been used to update the E-STA finite element model (FEM), without the need for a traditional fixed base modal survey. This innovative approach provided considerable program cost and test schedule savings. This paper documents this modal survey, which includes the modal pretest analysis sensor selection, the fixed base methodology using measured constraint shapes as virtual references and measured frequency response functions, and post-survey comparison between measured and analysis fixed base modal parameters.

  13. CONTRAST BETWEEN OSMIUM-FIXED AND PERMANGANATE-FIXED TOAD SPINAL GANGLIA

    PubMed Central

    Rosenbluth, Jack

    1963-01-01

    Chains of vesicles are prominent near the plasma membranes of both the neurons and satellite cells of osmium-fixed toad spinal ganglia. In permanganate-fixed specimens, however, such vesicles are absent, and in their place are continuous invaginations of the plasma membranes of these cells. The discrepancy suggests that the serried vesicles seen in osmium-fixed preparations arise through disintegration of plasma membrane invaginations, and do not represent active pinocytosis, as has been suggested previously. A second difference between ganglia fixed by these two methods is that rows of small, disconnected cytoplasmic globules occur in the sheaths of permanganate-fixed ganglia, but not in osmium-fixed samples. It is suggested that these globules arise from the breakdown of thin sheets of satellite cell cytoplasm which occur as continuous lamellae in osmium-fixed specimens. Possible mechanisms of these membrane reorganizations, and the relevance of these findings to other tissues, are discussed. PMID:13990905

  14. Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moak, Don J.; Grondin, Richard L.; Triner, Glen C.

    CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site andmore » off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the

  15. STS-26 MS Lounge in fixed based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Mission Specialist (MS) John M. Lounge, wearing comunications kit assembly headset and crouched on the aft flight deck, performs checklist inspection during training session. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  16. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  17. Gasification Product Improvement Facility (GPIF). Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The gasifier selected for development under this contract is an innovative and patented hybrid technology which combines the best features of both fixed-bed and fluidized-bed types. PyGas{trademark}, meaning Pyrolysis Gasification, is well suited for integration into advanced power cycles such as IGCC. It is also well matched to hot gas clean-up technologies currently in development. Unlike other gasification technologies, PyGas can be designed into both large and small scale systems. It is expected that partial repowering with PyGas could be done at a cost of electricity of only 2.78 cents/kWh, more economical than natural gas repowering. It is extremely unfortunatemore » that Government funding for such a noble cause is becoming reduced to the point where current contracts must be canceled. The Gasification Product Improvement Facility (GPIF) project was initiated to provide a test facility to support early commercialization of advanced fixed-bed coal gasification technology at a cost approaching $1,000 per kilowatt for electric power generation applications. The project was to include an innovative, advanced, air-blown, pressurized, fixed-bed, dry-bottom gasifier and a follow-on hot metal oxide gas desulfurization sub-system. To help defray the cost of testing materials, the facility was to be located at a nearby utility coal fired generating site. The patented PyGas{trademark} technology was selected via a competitive bidding process as the candidate which best fit overall DOE objectives. The paper describes the accomplishments to date.« less

  18. STS-26 crew on fixed based (FB) shuttle mission simulator (SMS) flight deck

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck (left) and Pilot Richard O. Covey review checklists in their respective stations on the foward flight deck. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  19. Anharmonic vibrational analysis of s-trans and s-cis conformers of acryloyl fluoride using numerical-analytic Van Vleck operator perturbation theory

    NASA Astrophysics Data System (ADS)

    Krasnoshchekov, Sergey V.; Craig, Norman C.; Koroleva, Lidiya A.; Stepanov, Nikolay F.

    2018-01-01

    A new gas-phase infrared (IR) spectrum of acryloyl fluoride (ACRF, CH2dbnd CHsbnd CFdbnd O) with a resolution of 0.1 cm- 1 in the range 4000-450 cm- 1 was measured. Theoretical ab initio molecular structures, full quartic potential energy surfaces (PES), and cubic surfaces of dipole moments and polarizability tensor components (electro-optical properties, EOP) of the s-trans and s-cis conformers of the ACRF were calculated by the second-order Møller-Plesset electronic perturbation theory with a correlation consistent Dunning triple-ζ basis set. The numerical-analytic implementation of the second-order operator canonical Van Vleck perturbation theory was employed for predicting anharmonic IR and Raman scattering (RS) spectra of ACRF. To improve the anharmonic predictions, harmonic frequencies were replaced by their counterparts evaluated with the higher-level CCSD(T)/cc-pVTZ model, to form a ;hybrid; PES. The original operator representation of the Hamiltonian is analytically reduced to a quasi-diagonal form, integrated in the harmonic oscillator basis and diagonalized to account for strong resonance couplings. Double canonical transformations of EOP expansions enabled prediction of integral intensities of both fundamental and multi-quanta transitions in IR/RS spectra. Enhanced band shape analysis reinforced the assignments. A thorough interpretation of the new IR experimental spectra and existing matrix-isolation literature data for the mixture of two conformers of ACRF was accomplished, and a number of assignments clarified.

  20. Using Radar, Lidar, and Radiometer measurements to Classify Cloud Type and Study Middle-Level Cloud Properties

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zhien

    2010-06-29

    The project is mainly focused on the characterization of cloud macrophysical and microphysical properties, especially for mixed-phased clouds and middle level ice clouds by combining radar, lidar, and radiometer measurements available from the ACRF sites. First, an advanced mixed-phase cloud retrieval algorithm will be developed to cover all mixed-phase clouds observed at the ACRF NSA site. The algorithm will be applied to the ACRF NSA observations to generate a long-term arctic mixed-phase cloud product for model validations and arctic mixed-phase cloud processes studies. To improve the representation of arctic mixed-phase clouds in GCMs, an advanced understanding of mixed-phase cloud processesmore » is needed. By combining retrieved mixed-phase cloud microphysical properties with in situ data and large-scale meteorological data, the project aim to better understand the generations of ice crystals in supercooled water clouds, the maintenance mechanisms of the arctic mixed-phase clouds, and their connections with large-scale dynamics. The project will try to develop a new retrieval algorithm to study more complex mixed-phase clouds observed at the ACRF SGP site. Compared with optically thin ice clouds, optically thick middle level ice clouds are less studied because of limited available tools. The project will develop a new two wavelength radar technique for optically thick ice cloud study at SGP site by combining the MMCR with the W-band radar measurements. With this new algorithm, the SGP site will have a better capability to study all ice clouds. Another area of the proposal is to generate long-term cloud type classification product for the multiple ACRF sites. The cloud type classification product will not only facilitates the generation of the integrated cloud product by applying different retrieval algorithms to different types of clouds operationally, but will also support other research to better understand cloud properties and to validate model

  1. Influence of temperament score and handling facility on stress, reproductive hormone concentrations, and fixed time AI pregnancy rates in beef heifers.

    PubMed

    Kasimanickam, R; Schroeder, S; Assay, M; Kasimanickam, V; Moore, D A; Gay, J M; Whittier, W D

    2014-10-01

    The objectives were (i) to evaluate the effect of temperament, determined by modified 2-point chute exit and gait score, on artificial insemination (AI) pregnancy rates in beef heifers following fixed time AI and (ii) to determine the effect of temperament on cortisol, substance-P, prolactin and progesterone at initiation of synchronization and at the time of AI. Angus beef heifers (n = 967) at eight locations were included in this study. At the initiation of synchronization (Day 0 = initiation of synchronization), all heifers received a body condition score (BCS), and temperament score (0 = calm; slow exit and walk or 1 = excitable; fast exit or jump or trot or run). Blood samples were collected from a sub-population of heifers (n = 86) at both synchronization initiation and the time of AI to determine the differences in serum progesterone, cortisol, prolactin and substance-P concentrations between temperament groups. Heifers were synchronized with 5-day CO-Synch+ controlled internal drug release (CIDR) protocol and were inseminated at 56 h after CIDR removal. Heifers were examined for pregnancy by ultrasound 70 days after AI to determine AI pregnancy. Controlling for synchronization treatment (p = 0.03), facility design (p = 0.05), and cattle handling facility design by temperament score interaction (p = 0.02), the AI pregnancy differed between heifers with excitable and calm temperament (51.9% vs 60.3%; p = 0.01). The alley-way with acute bends and turns, and long straight alley-way had lower AI pregnancy rate than did the semicircular alley-way (53.5%, 56.3% and 67.0% respectively; p = 0.05). The serum hormone concentrations differed significantly between different types of cattle handling facility (p < 0.05). The cattle handling facility design by temperament group interactions significantly influenced progesterone (p = 0.01), cortisol (p = 0.01), prolactin (p = 0.02) and substance-P (p = 0.04) both at the initiation of

  2. STS-26 MS Hilmers on fixed based (FB) shuttle mission simulator (SMS) middeck

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Mission Specialist (MS) David C. Hilmers prepares to ascend a ladder representing the interdeck access hatch from the shuttle middeck to the flight deck. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  3. Nauru Island Effect Detection Data Set

    DOE Data Explorer

    Long, Chuck

    2010-07-15

    During Nauru99 it was noted that the island was producing small clouds that advected over the ARM site. The Nauru Island Effect Study was run for 1.5 years and the methodology developed to detect the occurrence. Nauru ACRF downwelling SW, wind direction, and air temperature data are used, along with downwelling SW data from Licor radiometers located on the southern end of the island near the airport landing strip. A statistical analysis and comparison of data from the two locations is used to detect the likely occurrence of an island influence on the Nauru ACRF site data

  4. STS-26 Commander Hauck in fixed based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck, wearing comunications kit assembly headset and seated in the commanders seat on forward flight deck, looks over his shoulder toward the aft flight deck. A flight data file (FDF) notebook rests on his lap. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  5. Development of feedback-speed-control system of fixed-abrasive tool for mat-surface fabrication

    NASA Astrophysics Data System (ADS)

    Yanagihara, K.; Kita, R.

    2018-01-01

    This study deals with the new method to fabricate a mat-surface by using fixed-abrasive tool. Mat-surface is a surface with microscopic irregularities whose dimensions are close to the wavelengths of visible light (400-700 nanometers). In order to develop the new method to fabricate mat-surface without pre-masking and large scale back up facility, utilization of fixed-abrasive tool is discussed. The discussion clarifies that abrasives in shot blasting are given kinetic energy along to only plunge-direction while excluding traverse-direction. If the relative motion between tool and work in fixed-abrasive process can be realized as that in blasting, mat-surface will be accomplished with fixed-abrasive process. To realize the proposed idea, new surface-fabrication system to which is adopted feedback-speed-control of abrasive wheel has been designed. The system consists of micro-computer unit (MPU), work-speed sensor, fixed-abrasive wheel, and wheel driving unit. The system can control relative speed between work and wheel in optimum range to produce mat-surface. Finally experiment to verify the developed system is carried out. The results of experiments show that the developed system is effective and it can produce the surface from grinding to mat-surface seamlessly.

  6. 30 CFR 285.825 - When must I assess my facilities?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 285.825 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... CONTINENTAL SHELF Environmental and Safety Management, Inspections, and Facility Assessments for Activities... and Constructing Fixed Offshore Platforms—Working Stress Design (incorporated by reference, as...

  7. STS-29 Commander Coats in JSC fixed base (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    STS-29 Discovery, Orbiter Vehicle (OV) 103, Commander Michael L. Coats sits at commanders station forward flight deck controls in JSC fixed base (FB) shuttle mission simulator (SMS). Coats, wearing communications kit assembly headset and flight coveralls, looks away from forward control panels to aft flight deck. Pilots station seat back appears in foreground. FB-SMS is located in JSC Mission Simulation and Training Facility Bldg 5.

  8. Reliability of High-Temperature Fixed-Point Installations over 8 Years

    NASA Astrophysics Data System (ADS)

    Elliott, C. J.; Ford, T.; Ongrai, O.; Pearce, J. V.

    2017-12-01

    At NPL, high-temperature metal-carbon eutectic fixed points have been set up for thermocouple calibration purposes since 2006, for realising reference temperatures above the highest point specified in the International Temperature Scale of 1990 for contact thermometer calibrations. Additionally, cells of the same design have been provided by NPL to other national measurement institutes (NMIs) and calibration laboratories over this period, creating traceable and ISO 17025 accredited facilities around the world for calibrating noble metal thermocouples at 1324 {°}C (Co-C) and 1492 {°}C (Pd-C). This paper shows collections of thermocouple calibration results obtained during use of the high-temperature fixed-point cells at NPL and, as further examples, the use of cells installed at CCPI Europe (UK) and NIMT (Thailand). The lifetime of the cells can now be shown to be in excess of 7 years, whether used on a weekly or monthly basis, and whether used in an NMI or industrial calibration laboratory.

  9. STS-26 Commander Hauck in fixed based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck, wearing comunications kit assembly headset, checks control panel data while seated in the commanders seat on forward flight deck. A flight data file (FDF) notebook rests on his lap. A portable computer (laptop) is positioned on the center console. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  10. 48 CFR 970.5215-3 - Conditional payment of fee, profit, and other incentives-facility management contracts

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... period, the DOE Operations/Field Office Manager, or designee, may reduce any otherwise earned fee, fixed... prescribed in 970.1504-5(b)(1), insert the following clause: Conditional Payment of Fee, Profit, and Other Incentives—Facility Management Contracts (AUG 2009) (a) General. (1) The payment of earned fee, fixed fee...

  11. STS-26 crew trains in JSC fixed-based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1987-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, crewmembers (left to right) Commander Frederick H. Hauck, Pilot Richard O. Covey, Mission Specialist (MS) George D. Nelson, MS David C. Hilmers, and MS John M. Lounge pose on the middeck in fixed-based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5. A simulation for their anticipated June 1988 flight began 10-20-87.

  12. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current yearmore » and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  13. Scaling laws between population and facility densities.

    PubMed

    Um, Jaegon; Son, Seung-Woo; Lee, Sung-Ik; Jeong, Hawoong; Kim, Beom Jun

    2009-08-25

    When a new facility like a grocery store, a school, or a fire station is planned, its location should ideally be determined by the necessities of people who live nearby. Empirically, it has been found that there exists a positive correlation between facility and population densities. In the present work, we investigate the ideal relation between the population and the facility densities within the framework of an economic mechanism governing microdynamics. In previous studies based on the global optimization of facility positions in minimizing the overall travel distance between people and facilities, it was shown that the density of facility D and that of population rho should follow a simple power law D approximately rho(2/3). In our empirical analysis, on the other hand, the power-law exponent alpha in D approximately rho(alpha) is not a fixed value but spreads in a broad range depending on facility types. To explain this discrepancy in alpha, we propose a model based on economic mechanisms that mimic the competitive balance between the profit of the facilities and the social opportunity cost for populations. Through our simple, microscopically driven model, we show that commercial facilities driven by the profit of the facilities have alpha = 1, whereas public facilities driven by the social opportunity cost have alpha = 2/3. We simulate this model to find the optimal positions of facilities on a real U.S. map and show that the results are consistent with the empirical data.

  14. Maryland Health and Higher Educational Facilities Authority. 1996 Annual Report.

    ERIC Educational Resources Information Center

    Maryland State Health and Higher Educational Facilities Authority, Baltimore.

    The Maryland Health and Higher Educational Facilities Authority performs various functions including: issuing bonds and bond anticipation notes; fixing rates and collecting user rents and fees; constructing, acquiring, and maintaining institutional projects; contracting for operation and maintenance of projects; establishing rules and regulations…

  15. STS-46 crewmembers participate in Fixed Base (FB) SMS training at JSC

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-46 Atlantis, Orbiter Vehicle (OV) 104, Pilot Andrew M. Allen hands Mission Specialist (MS) and Payload Commander (PLC) Jeffrey A. Hoffman checklists from middeck locker MF43E during training session in JSC's fixed base (FB) shuttle mission simulator (SMS) located in Mission Simulation and Training Facility Bldg 5. European Space Agency (ESA) MS Claude Nicollier outfitted with communications kit assembly headset (HDST) and equipment looks beyond Hoffman to the opposite side of the middeck.

  16. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2009-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) is being considered to power deep space missions. An engineering unit, the ASRG-EU, was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently on an extended operation test at NASA Glenn Research Center to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for testing the ASRG-EU. Details of the test facility design are discussed. The facility can operate the convertors under AC bus control or with the ASRG-EU controller. It can regulate input thermal power in either a fixed temperature or fixed power mode. An enclosure circulates cooled air around the ASRG-EU to remove heat rejected from the ASRG-EU by convection. A custom monitoring and data acquisition system supports the test. Various safety features, which allow 2417 unattended operation, are discussed.

  17. [Business administration of PET facilities: a cost analysis of three facilities utilizing delivery FDG].

    PubMed

    Mitsutake, Naohiro; Oku, Shinya; Fujii, Ryo; Furui, Yuji; Yasunaga, Hideo

    2008-05-01

    PET (positron emission tomography) has been proved to be a powerful imaging tool in clinical oncology. The number of PET facilities in Japan has remarkably increased over the last decade. Furthermore, the approval of delivery FDG in 2005 resulted in a tremendous expansion of the PET institutions without a cyclotron facility. The aim of this study was to conduct a cost analysis of PET institutions that utilized delivery FDG. Three PET facilities using delivery FDG were investigated about the costs for PET service. Fixed costs included depreciation costs for construction and medical equipments such as positron camera. Variable costs consisted of costs for medical materials including delivery FDG. The break-even point was analyzed in each of three institutions. In the three hospitals (A, B and C), the annual number of PET scan was 1,591, 1,637 and 914, while cost per scan was accounted as yen 110,262, yen 111,091, and yen 134,192, respectively. The break-even point was calculated to be 2,583, 2,679 and 2,081, respectively. PET facilities utilizing delivery FDG seemed to have difficulty in business administration. Such a situation suggests the possibility that the current supply of PET facilities might exceed actual demand for the service. The efficiency of resource allocation should be taken into consideration in the future health service researches on PET.

  18. STS-26 crew trains in JSC fixed-based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1987-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, mission specialists pose on aft flight deck in fixed-based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5. Left to right, Mission Specialist (MS) John M. Lounge, MS George D. Nelson, and MS David C. Hilmers await start of FB-SMS simulation. The long simulation, part of the training for their anticipated June 1988 flight, began 10-20-87.

  19. STS-26 crew trains in JSC fixed-based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1987-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck (left) and Pilot Richard O. Covey train in JSC fixed-based (FB) shuttle mission simulator (SMS) located in the Mission Simulation and Training Facility Bldg 5. On FB-SMS flight deck, Hauck and Covey man their respective stations. Mission Specialist (MS) David C. Hilmers is partially visible in the foreground. A simulation for their anticipated June 1988 flight began 10-20-87.

  20. STS-46 crewmembers participate in Fixed Base (FB) SMS training at JSC

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-46 Atlantis, Orbiter Vehicle (OV) 104, Mission Specialist (MS) and Payload Commander (PLC) Jeffrey A. Hoffman, standing at the interdeck access ladder, explains procedures to backup Italian Payload Specialist Umberto Guidoni (center) and Italian Payload Specialist Franco Malerba (right) on the middeck of JSC's fixed base (FB) shuttle mission simulator (SMS). Behind them, MS Marsha S. Ivins reviews a cheklist. Participants are wearing communications kit assembly lightweight headsets (HDSTs). FB-SMS is located in JSC's Mission Simulation and Training Facility Bldg 5.

  1. (Un)Fixing Education

    ERIC Educational Resources Information Center

    Kuntz, Aaron M.; Petrovic, John E.

    2018-01-01

    In this article we consider the material dimensions of schooling as constitutive of the possibilities inherent in "fixing" education. We begin by mapping out the problem of "fixing education," pointing to the necrophilic tendencies of contemporary education--a desire to kill what otherwise might be life-giving. In this sense,…

  2. The colorimetric analysis of anti-tuberculosis fixed-dose combination tablets and capsules.

    PubMed

    Ellard, G A

    1999-11-01

    The perceived need to demonstrate whether or not the actual amounts of rifampicin, isoniazid and pyrazinamide in fixed-dose combination tablets or capsules correspond to their stated drug contents. To adapt specific, robust and simple colorimetric methods that have been previously applied to measuring plasma and urinary rifampicin, isoniazid, pyrazinamide and ethambutol concentrations to estimate tablet and capsule drug contents. The methods were applied to the analysis of 14 commercially manufactured fixed-dose combinations: two capsule and three tablet formulations containing rifampicin and isoniazid; seven tablet formulations containing rifampicin, isoniazid and pyrazinamide; and two tablet formulations containing rifampicin, isoniazid, pyrazinamide and ethambutol. All the combined formulations contained near to their stated drug contents. Replicate analyses confirmed the excellent precision of the drug analyses. Such methods are not only rapid to perform but should be practical in many Third World situations with relatively modest laboratory facilities.

  3. Evaluating cloud retrieval algorithms with the ARM BBHRP framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mlawer,E.; Dunn,M.; Mlawer, E.

    2008-03-10

    Climate and weather prediction models require accurate calculations of vertical profiles of radiative heating. Although heating rate calculations cannot be directly validated due to the lack of corresponding observations, surface and top-of-atmosphere measurements can indirectly establish the quality of computed heating rates through validation of the calculated irradiances at the atmospheric boundaries. The ARM Broadband Heating Rate Profile (BBHRP) project, a collaboration of all the working groups in the program, was designed with these heating rate validations as a key objective. Given the large dependence of radiative heating rates on cloud properties, a critical component of BBHRP radiative closure analysesmore » has been the evaluation of cloud microphysical retrieval algorithms. This evaluation is an important step in establishing the necessary confidence in the continuous profiles of computed radiative heating rates produced by BBHRP at the ARM Climate Research Facility (ACRF) sites that are needed for modeling studies. This poster details the continued effort to evaluate cloud property retrieval algorithms within the BBHRP framework, a key focus of the project this year. A requirement for the computation of accurate heating rate profiles is a robust cloud microphysical product that captures the occurrence, height, and phase of clouds above each ACRF site. Various approaches to retrieve the microphysical properties of liquid, ice, and mixed-phase clouds have been processed in BBHRP for the ACRF Southern Great Plains (SGP) and the North Slope of Alaska (NSA) sites. These retrieval methods span a range of assumptions concerning the parameterization of cloud location, particle density, size, shape, and involve different measurement sources. We will present the radiative closure results from several different retrieval approaches for the SGP site, including those from Microbase, the current 'reference' retrieval approach in BBHRP. At the NSA, mixed

  4. Preliminary technical data summary No. 3 for the Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, L.F.

    1980-05-01

    This document presents an update on the best information presently available for the purpose of establishing the basis for the design of a Defense Waste Processing Facility. Objective of this project is to provide a facility to fix the radionuclides present in Savannah River Plant (SRP) high-level liquid waste in a high-integrity form (glass). Flowsheets and material balances reflect the alternate CAB case including the incorporation of low-level supernate in concrete. (DLC)

  5. Asset Management: Roof Maintenance and Facility Energy Retrofits

    DTIC Science & Technology

    2012-03-01

    vapor low emission coatings. Floor finishes completed in ceramic stone tile were the most efficient floor coverings. Fixed insulated fiberglass window...been coined Asset Management which utilizes organizational levels of service, business case analysis, and risk analysis to address urgent...Force have left a number of facility systems such as roofs at risk to disrepair due to a lack of maintenance. Under the principles of asset

  6. A Game Theoretical Model for Location of Terror Response Facilities under Capacitated Resources

    PubMed Central

    Kang, Qi; Xu, Weisheng; Wu, Qidi

    2013-01-01

    This paper is concerned with the effect of capacity constraints on the locations of terror response facilities. We assume that the state has limited resources, and multiple facilities may be involved in the response until the demand is satisfied consequently. We formulate a leader-follower game model between the state and the terrorist and prove the existence and uniqueness of the Nash equilibrium. An integer linear programming is proposed to obtain the equilibrium results when the facility number is fixed. The problem is demonstrated by a case study of the 19 districts of Shanghai, China. PMID:24459446

  7. Validation of RNA-based molecular clonotype analysis for virus-specific CD8+ T-cells in formaldehyde-fixed specimens isolated from peripheral blood

    PubMed Central

    van Bockel, David; Price, David A.; Asher, Tedi E.; Venturi, Vanessa; Suzuki, Kazuo; Warton, Kristina; Davenport, Miles P.; Cooper, David A.; Douek, Daniel C.; Kelleher, Anthony D.

    2007-01-01

    Recent advances in the field of molecular clonotype analysis have enabled detailed repertoire characterization of viably isolated antigen-specific T cell populations directly ex vivo. However, in the absence of a biologically contained FACS facility, peripheral blood mononuclear cell (PBMC) preparations derived from patients infected with agents such as HIV must be formaldehyde fixed to inactivate the pathogen; this procedure adversely affects nucleic acid template quality. Here, we developed and validated a method to amplify and sequence mRNA species derived from formaldehyde fixed PBMC specimens. Antigen-specific CD8+ cytotoxic T-lymphocyte populations were identified with standard fluorochrome-conjugated peptide-major histocompatibility complex class I tetramers refolded around synthetic peptides representing immunodominant epitopes from HIV p24 Gag (KRWII[M/L]GLNK/HLA B*2705) and CMV pp65 (NLVPMVATV/HLA A*0201 and TPRVTGGGAM/HLA B*0702), and acquired in separate laboratories with or without fixation. In the presence of proteinase K pre-treatment, the observed antigen-specific CD8+ T-cell repertoire determined by molecular clonotype analysis was statistically no different whether derived from fixed or unfixed PBMC. However, oligo-dT recovery methods were not suitable for use with fixed tissue as significant skewing of clonotypic representation was observed. Thus, we have developed a reliable RNA-based method for molecular clonotype analysis that is compatible with formaldehyde fixation and therefore suitable for use with primary human samples isolated by FACS outside the context of a biological safety level 3 containment facility. PMID:17716684

  8. School Construction: Fixing Facilities

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2012-01-01

    About two decades ago, a consensus began to take root among educators and policymakers that school systems in the United States could no longer afford to ignore the inadequate building conditions that made teaching and learning difficult in many classrooms. Since then, billions of dollars have been spent, and thousands of modern classrooms have…

  9. [Development of fixed-base full task space flight training simulator].

    PubMed

    Xue, Liang; Chen, Shan-quang; Chang, Tian-chun; Yang, Hong; Chao, Jian-gang; Li, Zhi-peng

    2003-01-01

    Fixed-base full task flight training simulator is a very critical and important integrated training facility. It is mostly used in training of integrated skills and tasks, such as running the flight program of manned space flight, dealing with faults, operating and controlling spacecraft flight, communicating information between spacecraft and ground. This simulator was made up of several subentries including spacecraft simulation, simulating cabin, sight image, acoustics, main controlling computer, instructor and assistant support. It has implemented many simulation functions, such as spacecraft environment, spacecraft movement, communicating information between spacecraft and ground, typical faults, manual control and operating training, training control, training monitor, training database management, training data recording, system detecting and so on.

  10. Fourth-generation plasma immersion ion implantation and deposition facility for hybrid surface modification layer fabrication.

    PubMed

    Wang, Langping; Huang, Lei; Xie, Zhiwen; Wang, Xiaofeng; Tang, Baoyin

    2008-02-01

    The fourth-generation plasma immersion ion implantation and deposition (PIIID) facility for hybrid and batch treatment was built in our laboratory recently. Comparing with our previous PIIID facilities, several novel designs are utilized. Two multicathode pulsed cathodic arc plasma sources are fixed on the chamber wall symmetrically, which can increase the steady working time from 6 h (the single cathode source in our previous facilities) to about 18 h. Meanwhile, the inner diameter of the pulsed cathodic arc plasma source is increased from the previous 80 to 209 mm, thus, large area metal plasma can be obtained by the source. Instead of the simple sample holder in our previous facility, a complex revolution-rotation sample holder composed of 24 shafts, which can rotate around its axis and adjust its position through revolving around the center axis of the vacuum chamber, is fixed in the center of the vacuum chamber. In addition, one magnetron sputtering source is set on the chamber wall instead of the top cover in the previous facility. Because of the above characteristic, the PIIID hybrid process involving ion implantation, vacuum arc, and magnetron sputtering deposition can be acquired without breaking vacuum. In addition, the PIIID batch treatment of cylinderlike components can be finished by installing these components on the rotating shafts on the sample holder.

  11. Fixed-time stability of dynamical systems and fixed-time synchronization of coupled discontinuous neural networks.

    PubMed

    Hu, Cheng; Yu, Juan; Chen, Zhanheng; Jiang, Haijun; Huang, Tingwen

    2017-05-01

    In this paper, the fixed-time stability of dynamical systems and the fixed-time synchronization of coupled discontinuous neural networks are investigated under the framework of Filippov solution. Firstly, by means of reduction to absurdity, a theorem of fixed-time stability is established and a high-precision estimation of the settling-time is given. It is shown by theoretic proof that the estimation bound of the settling time given in this paper is less conservative and more accurate compared with the classical results. Besides, as an important application, the fixed-time synchronization of coupled neural networks with discontinuous activation functions is proposed. By designing a discontinuous control law and using the theory of differential inclusions, some new criteria are derived to ensure the fixed-time synchronization of the addressed coupled networks. Finally, two numerical examples are provided to show the effectiveness and validity of the theoretical results. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Small Angle Neutron Scattering (sans) Studies on "SIDE-END FIXED" and "SIDE-ON FIXED" Liquid Crystal Polymers

    NASA Astrophysics Data System (ADS)

    Hardouin, F.; Noirez, L.; Keller, P.; Leroux, N.; Cotton, J. P.

    The following sections are included: * Introduction * Experimental * Results and discussion * Determination of the backbone conformation in the nematic and smectic A phases of "side-end fixed" L.C. polymethacrylates (PMA) or polyacrylates (PA) * Determination of the global and backbone conformation in the nematic and smectic A phases of "side-end fixed" L.C. polysiloxanes (PMS) * Determination of the backbone conformation in the unique nematic phase (without smectic A phase) or in the reentrant nematic phase (below smectic A phase) of "side-end fixed" L.C. polyacrylates (PA) * Determination of the global conformation in the nematic phase of "side-on fixed" L.C. polysiloxanes (PMS) * Determination of the global conformation in the nematic phase of "diluted side-on fixed" L.C. copolysiloxanes * Determination of the backbone conformation in the nematic phase of "side-on fixed" L.C. polyacrylates * Conclusions * References

  13. Payment methods for outpatient care facilities

    PubMed Central

    Yuan, Beibei; He, Li; Meng, Qingyue; Jia, Liying

    2017-01-01

    trials, non-randomised trials, controlled before-after studies, interrupted time series, and repeated measures studies that compared different payment methods for outpatient health facilities. We defined outpatient care facilities in this review as facilities that provide health services to individuals who do not require hospitalisation or institutionalisation. We only included methods used to transfer funds from the purchaser of healthcare services to health facilities (including groups of individual professionals). These include global budgets, line-item budgets, capitation, fee-for-service (fixed and unconstrained), pay for performance, and mixed payment. The primary outcomes were service provision outcomes, patient outcomes, healthcare provider outcomes, costs for providers, and any adverse effects. Data collection and analysis At least two review authors independently extracted data and assessed the risk of bias. We conducted a structured synthesis. We first categorised the comparisons and outcomes and then described the effects of different types of payment methods on different categories of outcomes. We used a fixed-effect model for meta-analysis within a study if a study included more than one indicator in the same category of outcomes. We used a random-effects model for meta-analysis across studies. If the data for meta-analysis were not available in some studies, we calculated the median and interquartile range. We reported the risk ratio (RR) for dichotomous outcomes and the relative change for continuous outcomes. Main results We included 21 studies from Afghanistan, Burundi, China, Democratic Republic of Congo, Rwanda, Tanzania, the United Kingdom, and the United States of health facilities providing primary health care and mental health care. There were three kinds of payment comparisons. 1) Pay for performance (P4P) combined with some existing payment method (capitation or different kinds of input-based payment) compared to the existing payment method We

  14. Oblique view of Facility No. S362 showing the profile of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view of Facility No. S362 showing the profile of the ramp. Note the mooring cleat fixed to the top edge of the curb at left - U.S. Naval Base, Pearl Harbor, Seaplane Ramps - World War II Type, Southwest and west shore of Ford Island, near Wasp Boulevard, Pearl City, Honolulu County, HI

  15. CRISPR RNA and anti-CRISPR protein binding to the Xanthomonas albilineans Csy1-Csy2 heterodimer in the type I-F CRISPR-Cas system.

    PubMed

    Hong, Suji; Ka, Donghyun; Yoon, Seo Jeong; Suh, Nayoung; Jeong, Migyeong; Suh, Jeong-Yong; Bae, Euiyoung

    2018-02-23

    Clustered regularly interspaced short palindromic repeats (CRISPRs) and CRISPR-associated (Cas) proteins provide microbial adaptive immunity against bacteriophages. In type I-F CRISPR-Cas systems, multiple Cas proteins (Csy1-4) compose a surveillance complex (Csy complex) with CRISPR RNA (crRNA) for target recognition. Here, we report the biochemical characterization of the Csy1-Csy2 subcomplex from Xanthomonas albilineans , including the analysis of its interaction with crRNA and AcrF2, an anti-CRISPR (Acr) protein from a phage that infects Pseudomonas aeruginosa The X. albilineans Csy1 and Csy2 proteins (XaCsy1 and XaCsy2, respectively) formed a stable heterodimeric complex that specifically bound the 8-nucleotide (nt) 5'-handle of the crRNA. In contrast, the XaCsy1-XaCsy2 heterodimer exhibited reduced affinity for the 28-nt X. albilineans CRISPR repeat RNA containing the 5'-handle sequence. Chromatographic and calorimetric analyses revealed tight binding between the Acr protein from the P. aeruginosa phage and the heterodimeric subunit of the X. albilineans Csy complex, suggesting that AcrF2 recognizes conserved features of Csy1-Csy2 heterodimers. We found that neither XaCsy1 nor XaCsy2 alone forms a stable complex with AcrF2 and the 5'-handle RNA, indicating that XaCsy1-XaCsy2 heterodimerization is required for binding them. We also solved the crystal structure of AcrF2 to a resolution of 1.34 Å, enabling a more detailed structural analysis of the residues involved in the interactions with the Csy1-Csy2 heterodimer. Our results provide information about the order of events during the formation of the multisubunit crRNA-guided surveillance complex and suggest that the Acr protein inactivating type I-F CRISPR-Cas systems has broad specificity. © 2018 by The American Society for Biochemistry and Molecular Biology, Inc.

  16. AAV liver expression of FIX-Padua prevents and eradicates FIX inhibitor without increasing thrombogenicity in hemophilia B dogs and mice.

    PubMed

    Crudele, Julie M; Finn, Jonathan D; Siner, Joshua I; Martin, Nicholas B; Niemeyer, Glenn P; Zhou, Shangzhen; Mingozzi, Federico; Lothrop, Clinton D; Arruda, Valder R

    2015-03-05

    Emerging successful clinical data on gene therapy using adeno-associated viral (AAV) vector for hemophilia B (HB) showed that the risk of cellular immune response to vector capsid is clearly dose dependent. To decrease the vector dose, we explored AAV-8 (1-3 × 10(12) vg/kg) encoding a hyperfunctional factor IX (FIX-Padua, arginine 338 to leucine) in FIX inhibitor-prone HB dogs. Two naïve HB dogs showed sustained expression of FIX-Padua with an 8- to 12-fold increased specific activity reaching 25% to 40% activity without antibody formation to FIX. A third dog with preexisting FIX inhibitors exhibited a transient anamnestic response (5 Bethesda units) at 2 weeks after vector delivery following by spontaneous eradication of the antibody to FIX by day 70. In this dog, sustained FIX expression reached ∼200% and 30% of activity and antigen levels, respectively. Immune tolerance was confirmed in all dogs after challenges with plasma-derived FIX concentrate. Shortening of the clotting times and lack of bleeding episodes support the phenotypic correction of the severe phenotype, with no clinical or laboratory evidence of risk of thrombosis. Provocative studies in mice showed that FIX-Padua exhibits similar immunogenicity and thrombogenicity compared with FIX wild type. Collectively, these data support the potential translation of gene-based strategies using FIX-Padua for HB. © 2015 by The American Society of Hematology.

  17. Litho hotspots fixing using model based algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, Meili; Yu, Shirui; Mao, Zhibiao; Shafee, Marwa; Madkour, Kareem; ElManhawy, Wael; Kwan, Joe; Hu, Xinyi; Wan, Qijian; Du, Chunshan

    2017-04-01

    As technology advances, IC designs are getting more sophisticated, thus it becomes more critical and challenging to fix printability issues in the design flow. Running lithography checks before tapeout is now mandatory for designers, which creates a need for more advanced and easy-to-use techniques for fixing hotspots found after lithographic simulation without creating a new design rule checking (DRC) violation or generating a new hotspot. This paper presents a new methodology for fixing hotspots on layouts while using the same engine currently used to detect the hotspots. The fix is achieved by applying minimum movement of edges causing the hotspot, with consideration of DRC constraints. The fix is internally simulated by the lithographic simulation engine to verify that the hotspot is eliminated and that no new hotspot is generated by the new edge locations. Hotspot fix checking is enhanced by adding DRC checks to the litho-friendly design (LFD) rule file to guarantee that any fix options that violate DRC checks are removed from the output hint file. This extra checking eliminates the need to re-run both DRC and LFD checks to ensure the change successfully fixed the hotspot, which saves time and simplifies the designer's workflow. This methodology is demonstrated on industrial designs, where the fixing rate of single and dual layer hotspots is reported.

  18. Optical laboratory facilities at the Finnish Meteorological Institute - Arctic Research Centre

    NASA Astrophysics Data System (ADS)

    Lakkala, Kaisa; Suokanerva, Hanne; Matti Karhu, Juha; Aarva, Antti; Poikonen, Antti; Karppinen, Tomi; Ahponen, Markku; Hannula, Henna-Reetta; Kontu, Anna; Kyrö, Esko

    2016-07-01

    This paper describes the laboratory facilities at the Finnish Meteorological Institute - Arctic Research Centre (FMI-ARC, http://fmiarc.fmi.fi). They comprise an optical laboratory, a facility for biological studies, and an office. A dark room has been built, in which an optical table and a fixed lamp test system are set up, and the electronics allow high-precision adjustment of the current. The Brewer spectroradiometer, NILU-UV multifilter radiometer, and Analytical Spectral Devices (ASD) spectroradiometer of the FMI-ARC are regularly calibrated or checked for stability in the laboratory. The facilities are ideal for responding to the needs of international multidisciplinary research, giving the possibility to calibrate and characterize the research instruments as well as handle and store samples.

  19. 30 CFR 56.11006 - Fixed ladder landings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fixed ladder landings. 56.11006 Section 56....11006 Fixed ladder landings. Fixed ladders shall project at least 3 feet above landings, or subtantial handholds shall be provided above the landings. ...

  20. 30 CFR 56.11006 - Fixed ladder landings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fixed ladder landings. 56.11006 Section 56....11006 Fixed ladder landings. Fixed ladders shall project at least 3 feet above landings, or subtantial handholds shall be provided above the landings. ...

  1. A Climatology of Fair-Weather Cloud Statistics at the Atmospheric Radiation Measurement Program Southern Great Plains Site: Temporal and Spatial Variability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, Larry K.; Kassianov, Evgueni I.; Long, Charles N.

    2006-03-30

    In previous work, Berg and Stull (2005) developed a new parameterization for Fair-Weather Cumuli (FWC). Preliminary testing of the new scheme used data collected during a field experiment conducted during the summer of 1996. This campaign included a few research flights conducted over three locations within the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) Southern Great Plains (SGP) site. A more comprehensive verification of the new scheme requires a detailed climatology of FWC. Several cloud climatologies have been completed for the ACRF SGP, but these efforts have focused on either broad categories of clouds grouped by height and seasonmore » (e.g., Lazarus et al. 1999) or height and time of day (e.g., Dong et al. 2005). In these two examples, the low clouds were not separated by the type of cloud, either stratiform or cumuliform, nor were the horizontal chord length (the length of the cloud slice that passed directly overhead) or cloud aspect ratio (defined as the ratio of the cloud thickness to the cloud chord length) reported. Lane et al. (2002) presented distributions of cloud chord length, but only for one year. The work presented here addresses these shortcomings by looking explicitly at cases with FWC over five summers. Specifically, we will address the following questions: •Does the cloud fraction (CF), cloud-base height (CBH), and cloud-top height (CTH) of FWC change with the time of day or the year? •What is the distribution of FWC chord lengths? •Is there a relationship between the cloud chord length and the cloud thickness?« less

  2. The unified database for the fixed target experiment BM@N

    NASA Astrophysics Data System (ADS)

    Gertsenberger, K. V.

    2016-09-01

    The article describes the developed database designed as comprehensive data storage of the fixed target experiment BM@N [1] at Joint Institute for Nuclear Research (JINR) in Dubna. The structure and purposes of the BM@N facility will be briefly presented. The scheme of the unified database and its parameters will be described in detail. The use of the BM@N database implemented on the PostgreSQL database management system (DBMS) allows one to provide user access to the actual information of the experiment. Also the interfaces developed for the access to the database will be presented. One was implemented as the set of C++ classes to access the data without SQL statements, the other-Web-interface being available on the Web page of the BM@N experiment.

  3. 48 CFR 931.102 - Fixed-price contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fixed-price contracts. 931... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Applicability 931.102 Fixed-price contracts. The intent of... Government in— (a) Pricing fixed-price prime contracts and modifications, (b) Evaluating the reasonableness...

  4. Terminal configured vehicle program: Test facilities guide

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The terminal configured vehicle (TCV) program was established to conduct research and to develop and evaluate aircraft and flight management system technology concepts that will benefit conventional take off and landing operations in the terminal area. Emphasis is placed on the development of operating methods for the highly automated environment anticipated in the future. The program involves analyses, simulation, and flight experiments. Flight experiments are conducted using a modified Boeing 737 airplane equipped with highly flexible display and control equipment and an aft flight deck for research purposes. The experimental systems of the Boeing 737 are described including the flight control computer systems, the navigation/guidance system, the control and command panel, and the electronic display system. The ground based facilities used in the program are described including the visual motion simulator, the fixed base simulator, the verification and validation laboratory, and the radio frequency anechoic facility.

  5. 30 CFR 57.11006 - Fixed ladder landings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fixed ladder landings. 57.11006 Section 57... Escapeways Travelways-Surface and Underground § 57.11006 Fixed ladder landings. Fixed ladders shall project at least 3 feet above landings, or substantial handholds shall be provided above the landings. ...

  6. 30 CFR 57.11006 - Fixed ladder landings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fixed ladder landings. 57.11006 Section 57... Escapeways Travelways-Surface and Underground § 57.11006 Fixed ladder landings. Fixed ladders shall project at least 3 feet above landings, or substantial handholds shall be provided above the landings. ...

  7. 46 CFR 28.260 - Electronic position fixing devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Electronic position fixing devices. 28.260 Section 28... Trade § 28.260 Electronic position fixing devices. Each vessel 79 feet (24 meters) or more in length must be equipped with an electronic position fixing device capable of providing accurate fixes for the...

  8. 46 CFR 28.260 - Electronic position fixing devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Electronic position fixing devices. 28.260 Section 28... Trade § 28.260 Electronic position fixing devices. Each vessel 79 feet (24 meters) or more in length must be equipped with an electronic position fixing device capable of providing accurate fixes for the...

  9. 46 CFR 28.260 - Electronic position fixing devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Electronic position fixing devices. 28.260 Section 28... Trade § 28.260 Electronic position fixing devices. Each vessel 79 feet (24 meters) or more in length must be equipped with an electronic position fixing device capable of providing accurate fixes for the...

  10. 46 CFR 28.260 - Electronic position fixing devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Electronic position fixing devices. 28.260 Section 28... Trade § 28.260 Electronic position fixing devices. Each vessel 79 feet (24 meters) or more in length must be equipped with an electronic position fixing device capable of providing accurate fixes for the...

  11. 46 CFR 28.260 - Electronic position fixing devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Electronic position fixing devices. 28.260 Section 28... Trade § 28.260 Electronic position fixing devices. Each vessel 79 feet (24 meters) or more in length must be equipped with an electronic position fixing device capable of providing accurate fixes for the...

  12. Better Contract Oversight Could Have Prevented Deficiencies in the Detention Facility in Parwan, Afghanistan

    DTIC Science & Technology

    2012-05-17

    a visitation center, a water treatment plant, and vocational buildings where detainees can learn carpentry and culinary skills. The facility also...room not connected MHU PPI 69 DCID HVAC unit is inoperable Ml DAB PPI has o rdered p arts and w ill fix w hen it arrives 70 Access broken to VCD

  13. Mechanisms of and facility types involved in hazardous materials incidents.

    PubMed Central

    Kales, S N; Polyhronopoulos, G N; Castro, M J; Goldman, R H; Christiani, D C

    1997-01-01

    The purpose of this study was to systematically investigate hazardous materials (hazmat) releases and determine the mechanisms of these accidents, and the industries/activities and chemicals involved. We analyzed responses by Massachusetts' six district hazmat teams from their inception through May 1996. Information from incident reports was extracted onto standard coding sheets. The majority of hazardous materials incidents were caused by spills, leaks, or escapes of hazardous materials (76%) and occurred at fixed facilities (80%). Transportation-related accidents accounted for 20% of incidents. Eleven percent of hazardous materials incidents were at schools or health care facilities. Petroleum-derived fuels were involved in over half of transportation-related accidents, and these accounted for the majority of petroleum fuel releases. Chlorine derivatives were involved in 18% of all accidents and were associated with a wide variety of facility types and activities. In conclusion, systematic study of hazardous materials incidents allows the identification of preventable causes of these incidents. PMID:9300926

  14. Fixed or mobile-bearing total knee arthroplasty

    PubMed Central

    Huang, Chun-Hsiung; Liau, Jiann-Jong; Cheng, Cheng-Kung

    2007-01-01

    Fixed and mobile-bearing in total knee arthroplasty are still discussed controversially. In this article, biomechanical and clinical aspects in both fixed and mobile-bearing designs were reviewed. In biomechanical aspect, the mobile-bearing design has proved to provide less tibiofemoral contact stresses under tibiofemoral malalignment conditions. It also provides less wear rate in in-vitro simulator test. Patients with posterior stabilized mobile-bearing knees had more axial tibiofemoral rotation than patients with posterior stabilized fixed-bearing knees during gait as well as in a deep knee-bend activity. However, in clinical aspect, the mid-term or long-term survivorship of mobile-bearing knees has no superiority over that of fixed-bearing knees. The theoretical advantages for mobile-bearing design to provide a long-term durability have not been demonstrated by any outcome studies. Finally, the fixed-bearing design with all-polyethylene tibial component is suggested for relatively inactive, elder people. The mobile-bearing design is suggested for younger or higher-demand patients due to the potential for reduced polyethylene wear and more normal kinematics response after joint replacement. For younger surgeon, the fixed-bearing design is suggested due to less demand for surgical technique. For experienced surgeon, one familiar surgical protocol and instrumentation is suggested rather than implant design, either fixed-bearing or mobile-bearing. PMID:17204165

  15. Fixed or mobile-bearing total knee arthroplasty.

    PubMed

    Huang, Chun-Hsiung; Liau, Jiann-Jong; Cheng, Cheng-Kung

    2007-01-05

    Fixed and mobile-bearing in total knee arthroplasty are still discussed controversially. In this article, biomechanical and clinical aspects in both fixed and mobile-bearing designs were reviewed. In biomechanical aspect, the mobile-bearing design has proved to provide less tibiofemoral contact stresses under tibiofemoral malalignment conditions. It also provides less wear rate in in-vitro simulator test. Patients with posterior stabilized mobile-bearing knees had more axial tibiofemoral rotation than patients with posterior stabilized fixed-bearing knees during gait as well as in a deep knee-bend activity. However, in clinical aspect, the mid-term or long-term survivorship of mobile-bearing knees has no superiority over that of fixed-bearing knees. The theoretical advantages for mobile-bearing design to provide a long-term durability have not been demonstrated by any outcome studies. Finally, the fixed-bearing design with all-polyethylene tibial component is suggested for relatively inactive, elder people. The mobile-bearing design is suggested for younger or higher-demand patients due to the potential for reduced polyethylene wear and more normal kinematics response after joint replacement. For younger surgeon, the fixed-bearing design is suggested due to less demand for surgical technique. For experienced surgeon, one familiar surgical protocol and instrumentation is suggested rather than implant design, either fixed-bearing or mobile-bearing.

  16. A State-of-the-Art Contamination Effects Research and Test Facility

    NASA Technical Reports Server (NTRS)

    Olson, Keith R.; Folgner, Kelsey A.; Barrie, James D.; Villahermosa, Randy M.

    2008-01-01

    In the ongoing effort to better understand various spacecraft contamination phenomena, a new state of the art contamination effects research and test facility was designed, and recently brought on-line at The Aerospace Corporation s Space Materials Laboratory. This high vacuum test chamber employs multiple in-situ analytical techniques, making it possible to study both the qualitative and quantitative aspects of contaminant film formation in the presence or absence of VUV radiation. Adsorption and desorption kinetics, "photo-fixing efficiency", transmission loss of uniform contaminant films, light scatter from non-uniform films, and film morphology have been studied in this facility. This paper describes this new capability in detail and presents data collected from several of the analytical instruments.

  17. Democratic superstring field theory: gauge fixing

    NASA Astrophysics Data System (ADS)

    Kroyter, Michael

    2011-03-01

    We show that a partial gauge fixing of the NS sector of the democratic-picture superstring field theory leads to the non-polynomial theory. Moreover, by partially gauge fixing the Ramond sector we obtain a non-polynomial fully RNS theory at pictures 0 and 1/2 . Within the democratic theory and in the partially gauge fixed theory the equations of motion of both sectors are derived from an action. We also discuss a representation of the non-polynomial theory analogous to a manifestly two-dimensional representation of WZW theory and the action of bosonic pure-gauge solutions. We further demonstrate that one can consistently gauge fix the NS sector of the democratic theory at picture number -1. The resulting theory is new. It is a {mathbb{Z}_2} dual of the modified cubic theory. We construct analytical solutions of this theory and show that they possess the desired properties.

  18. Weather Impact on Airport Arrival Meter Fix Throughput

    NASA Technical Reports Server (NTRS)

    Wang, Yao

    2017-01-01

    Time-based flow management provides arrival aircraft schedules based on arrival airport conditions, airport capacity, required spacing, and weather conditions. In order to meet a scheduled time at which arrival aircraft can cross an airport arrival meter fix prior to entering the airport terminal airspace, air traffic controllers make regulations on air traffic. Severe weather may create an airport arrival bottleneck if one or more of airport arrival meter fixes are partially or completely blocked by the weather and the arrival demand has not been reduced accordingly. Under these conditions, aircraft are frequently being put in holding patterns until they can be rerouted. A model that predicts the weather impacted meter fix throughput may help air traffic controllers direct arrival flows into the airport more efficiently, minimizing arrival meter fix congestion. This paper presents an analysis of air traffic flows across arrival meter fixes at the Newark Liberty International Airport (EWR). Several scenarios of weather impacted EWR arrival fix flows are described. Furthermore, multiple linear regression and regression tree ensemble learning approaches for translating multiple sector Weather Impacted Traffic Indexes (WITI) to EWR arrival meter fix throughputs are examined. These weather translation models are developed and validated using the EWR arrival flight and weather data for the period of April-September in 2014. This study also compares the performance of the regression tree ensemble with traditional multiple linear regression models for estimating the weather impacted throughputs at each of the EWR arrival meter fixes. For all meter fixes investigated, the results from the regression tree ensemble weather translation models show a stronger correlation between model outputs and observed meter fix throughputs than that produced from multiple linear regression method.

  19. A simulated lightning effects test facility for testing live and inert missiles and components

    NASA Technical Reports Server (NTRS)

    Craven, Jeffery D.; Knaur, James A.; Moore, Truman W., Jr.; Shumpert, Thomas H.

    1991-01-01

    Details of a simulated lightning effects test facility for testing live and inert missiles, motors, and explosive components are described. The test facility is designed to simulate the high current, continuing current, and high rate-of-rise current components of an idealized direct strike lightning waveform. The Lightning Test Facility was in operation since May, 1988, and consists of: 3 separate capacitor banks used to produce the lightning test components; a permanently fixed large steel safety cage for retaining the item under test (should it be ignited during testing); an earth covered bunker housing the control/equipment room; a charge/discharge building containing the charging/discharging switching; a remotely located blockhouse from which the test personnel control hazardous testing; and interconnecting cables.

  20. Fixed-Rate Compressed Floating-Point Arrays.

    PubMed

    Lindstrom, Peter

    2014-12-01

    Current compression schemes for floating-point data commonly take fixed-precision values and compress them to a variable-length bit stream, complicating memory management and random access. We present a fixed-rate, near-lossless compression scheme that maps small blocks of 4(d) values in d dimensions to a fixed, user-specified number of bits per block, thereby allowing read and write random access to compressed floating-point data at block granularity. Our approach is inspired by fixed-rate texture compression methods widely adopted in graphics hardware, but has been tailored to the high dynamic range and precision demands of scientific applications. Our compressor is based on a new, lifted, orthogonal block transform and embedded coding, allowing each per-block bit stream to be truncated at any point if desired, thus facilitating bit rate selection using a single compression scheme. To avoid compression or decompression upon every data access, we employ a software write-back cache of uncompressed blocks. Our compressor has been designed with computational simplicity and speed in mind to allow for the possibility of a hardware implementation, and uses only a small number of fixed-point arithmetic operations per compressed value. We demonstrate the viability and benefits of lossy compression in several applications, including visualization, quantitative data analysis, and numerical simulation.

  1. 48 CFR 1828.370 - Fixed-price contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Fixed-price contract... ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1828.370 Fixed-price contract... Risk, in all negotiated fixed-price contracts for the development, production, modification...

  2. Fixed-node quantum Monte Carlo

    NASA Astrophysics Data System (ADS)

    Anderson, James B.

    Quantum Monte Carlo methods cannot at present provide exact solutions of the Schrödinger equation for systems with more than a few electrons. But, quantum Monte Carlo calculations can provide very low energy, highly accurate solutions for many systems ranging up to several hundred electrons. These systems include atoms such as Be and Fe, molecules such as H2O, CH4, and HF, and condensed materials such as solid N2 and solid silicon. The quantum Monte Carlo predictions of their energies and structures may not be `exact', but they are the best available. Most of the Monte Carlo calculations for these systems have been carried out using approximately correct fixed nodal hypersurfaces and they have come to be known as `fixed-node quantum Monte Carlo' calculations. In this paper we review these `fixed node' calculations and the accuracies they yield.

  3. Precise Point Positioning with Partial Ambiguity Fixing.

    PubMed

    Li, Pan; Zhang, Xiaohong

    2015-06-10

    Reliable and rapid ambiguity resolution (AR) is the key to fast precise point positioning (PPP). We propose a modified partial ambiguity resolution (PAR) method, in which an elevation and standard deviation criterion are first used to remove the low-precision ambiguity estimates for AR. Subsequently the success rate and ratio-test are simultaneously used in an iterative process to increase the possibility of finding a subset of decorrelated ambiguities which can be fixed with high confidence. One can apply the proposed PAR method to try to achieve an ambiguity-fixed solution when full ambiguity resolution (FAR) fails. We validate this method using data from 450 stations during DOY 021 to 027, 2012. Results demonstrate the proposed PAR method can significantly shorten the time to first fix (TTFF) and increase the fixing rate. Compared with FAR, the average TTFF for PAR is reduced by 14.9% for static PPP and 15.1% for kinematic PPP. Besides, using the PAR method, the average fixing rate can be increased from 83.5% to 98.2% for static PPP, from 80.1% to 95.2% for kinematic PPP respectively. Kinematic PPP accuracy with PAR can also be significantly improved, compared to that with FAR, due to a higher fixing rate.

  4. Precise Point Positioning with Partial Ambiguity Fixing

    PubMed Central

    Li, Pan; Zhang, Xiaohong

    2015-01-01

    Reliable and rapid ambiguity resolution (AR) is the key to fast precise point positioning (PPP). We propose a modified partial ambiguity resolution (PAR) method, in which an elevation and standard deviation criterion are first used to remove the low-precision ambiguity estimates for AR. Subsequently the success rate and ratio-test are simultaneously used in an iterative process to increase the possibility of finding a subset of decorrelated ambiguities which can be fixed with high confidence. One can apply the proposed PAR method to try to achieve an ambiguity-fixed solution when full ambiguity resolution (FAR) fails. We validate this method using data from 450 stations during DOY 021 to 027, 2012. Results demonstrate the proposed PAR method can significantly shorten the time to first fix (TTFF) and increase the fixing rate. Compared with FAR, the average TTFF for PAR is reduced by 14.9% for static PPP and 15.1% for kinematic PPP. Besides, using the PAR method, the average fixing rate can be increased from 83.5% to 98.2% for static PPP, from 80.1% to 95.2% for kinematic PPP respectively. Kinematic PPP accuracy with PAR can also be significantly improved, compared to that with FAR, due to a higher fixing rate. PMID:26067196

  5. Development and validation of the crew-station system-integration research facility

    NASA Technical Reports Server (NTRS)

    Nedell, B.; Hardy, G.; Lichtenstein, T.; Leong, G.; Thompson, D.

    1986-01-01

    The various issues associated with the use of integrated flight management systems in aircraft were discussed. To address these issues a fixed base integrated flight research (IFR) simulation of a helicopter was developed to support experiments that contribute to the understanding of design criteria for rotorcraft cockpits incorporating advanced integrated flight management systems. A validation experiment was conducted that demonstrates the main features of the facility and the capability to conduct crew/system integration research.

  6. 46 CFR 130.320 - Electronic position-fixing device.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electronic position-fixing device. 130.320 Section 130... CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Navigational Equipment § 130.320 Electronic position-fixing device. Each vessel must be equipped with an electronic position-fixing device satisfactory for...

  7. 46 CFR 130.320 - Electronic position-fixing device.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electronic position-fixing device. 130.320 Section 130... CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Navigational Equipment § 130.320 Electronic position-fixing device. Each vessel must be equipped with an electronic position-fixing device satisfactory for...

  8. 46 CFR 130.320 - Electronic position-fixing device.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electronic position-fixing device. 130.320 Section 130... CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Navigational Equipment § 130.320 Electronic position-fixing device. Each vessel must be equipped with an electronic position-fixing device satisfactory for...

  9. 46 CFR 130.320 - Electronic position-fixing device.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electronic position-fixing device. 130.320 Section 130... CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Navigational Equipment § 130.320 Electronic position-fixing device. Each vessel must be equipped with an electronic position-fixing device satisfactory for...

  10. 46 CFR 130.320 - Electronic position-fixing device.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electronic position-fixing device. 130.320 Section 130... CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Navigational Equipment § 130.320 Electronic position-fixing device. Each vessel must be equipped with an electronic position-fixing device satisfactory for...

  11. 48 CFR 46.302 - Fixed-price supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price supply... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.302 Fixed-price supply contracts. The contracting officer shall insert the clause at 52.246-2, Inspection of Supplies—Fixed-Price, in solicitations and...

  12. Heron Triangles with Two Fixed Sides

    DTIC Science & Technology

    2006-10-08

    number of divisors of the positive integer n. Theorem 2.3. If a and b are fixed, then H(a, b) ≤ 4τ(ab)2. Proof. We start with the following observation...obtain a more precise result which improves upon [2]. Theorem 2.4. If p and q are two fixed primes, then H(p, q) is  = 0 if both p and q are...conclude the proof of Theorem 2.4, it suffices to show that if p and q are fixed, then at most five of the above eight equations can produce integer

  13. Adhesives for fixed orthodontic bands.

    PubMed

    Millett, Declan T; Glenny, Anne-Marie; Mattick, Rye Cr; Hickman, Joy; Mandall, Nicky A

    2016-10-25

    Orthodontic treatment involves using fixed or removable appliances (dental braces) to correct the positions of teeth. It has been shown that the quality of treatment result obtained with fixed appliances is much better than with removable appliances. Fixed appliances are, therefore, favoured by most orthodontists for treatment. The success of a fixed orthodontic appliance depends on the metal attachments (brackets and bands) being attached securely to the teeth so that they do not become loose during treatment. Brackets are usually attached to the front and side teeth, whereas bands (metal rings that go round the teeth) are more commonly used on the back teeth (molars). A number of adhesives are available to attach bands to teeth and it is important to understand which group of adhesives bond most reliably, as well as reducing or preventing dental decay during the treatment period. To evaluate the effectiveness of the adhesives used to attach bands to teeth during fixed appliance treatment, in terms of:(1) how often the bands come off during treatment; and(2) whether they protect the banded teeth against decay during fixed appliance treatment. The following electronic databases were searched: Cochrane Oral Health's Trials Register (searched 2 June 2016), Cochrane Central Register of Controlled Trials (CENTRAL; 2016, Issue 5) in the Cochrane Library (searched 2 June 2016), MEDLINE Ovid (1946 to 2 June 2016) and EMBASE Ovid (1980 to 2 June 2016). We searched ClinicalTrials.gov and the World Health Organization International Clinical Trials Registry Platform for ongoing trials. No restrictions were placed on the language or date of publication when searching the electronic databases. Randomised and controlled clinical trials (RCTs and CCTs) (including split-mouth studies) of adhesives used to attach orthodontic bands to molar teeth were selected. Patients with full arch fixed orthodontic appliance(s) who had bands attached to molars were included. All review authors

  14. 46 CFR 121.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electronic position fixing devices. 121.410 Section 121... AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Navigation Equipment § 121.410 Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position fixing device, capable...

  15. 46 CFR 121.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electronic position fixing devices. 121.410 Section 121... AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Navigation Equipment § 121.410 Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position fixing device, capable...

  16. 46 CFR 121.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electronic position fixing devices. 121.410 Section 121... AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Navigation Equipment § 121.410 Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position fixing device, capable...

  17. 46 CFR 121.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electronic position fixing devices. 121.410 Section 121... AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Navigation Equipment § 121.410 Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position fixing device, capable...

  18. 46 CFR 121.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electronic position fixing devices. 121.410 Section 121... AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Navigation Equipment § 121.410 Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position fixing device, capable...

  19. Wall shear stress fixed points in blood flow

    NASA Astrophysics Data System (ADS)

    Arzani, Amirhossein; Shadden, Shawn

    2017-11-01

    Patient-specific computational fluid dynamics produces large datasets, and wall shear stress (WSS) is one of the most important parameters due to its close connection with the biological processes at the wall. While some studies have investigated WSS vectorial features, the WSS fixed points have not received much attention. In this talk, we will discuss the importance of WSS fixed points from three viewpoints. First, we will review how WSS fixed points relate to the flow physics away from the wall. Second, we will discuss how certain types of WSS fixed points lead to high biochemical surface concentration in cardiovascular mass transport problems. Finally, we will introduce a new measure to track the exposure of endothelial cells to WSS fixed points.

  20. Evidence of the big fix

    NASA Astrophysics Data System (ADS)

    Hamada, Yuta; Kawai, Hikaru; Kawana, Kiyoharu

    2014-06-01

    We give an evidence of the Big Fix. The theory of wormholes and multiverse suggests that the parameters of the Standard Model are fixed in such a way that the total entropy at the late stage of the universe is maximized, which we call the maximum entropy principle. In this paper, we discuss how it can be confirmed by the experimental data, and we show that it is indeed true for the Higgs vacuum expectation value vh. We assume that the baryon number is produced by the sphaleron process, and that the current quark masses, the gauge couplings and the Higgs self-coupling are fixed when we vary vh. It turns out that the existence of the atomic nuclei plays a crucial role to maximize the entropy. This is reminiscent of the anthropic principle, however it is required by the fundamental law in our case.

  1. Updraft Fixed Bed Gasification Aspen Plus Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2007-09-27

    The updraft fixed bed gasification model provides predictive modeling capabilities for updraft fixed bed gasifiers, when devolatilization data is available. The fixed bed model is constructed using Aspen Plus, process modeling software, coupled with a FORTRAN user kinetic subroutine. Current updraft gasification models created in Aspen Plus have limited predictive capabilities and must be "tuned" to reflect a generalized gas composition as specified in literature or by the gasifier manufacturer. This limits the applicability of the process model.

  2. Performance determinants of fixed gear cycling during criteriums.

    PubMed

    Babault, Nicolas; Poisson, Maxime; Cimadoro, Guiseppe; Cometti, Carole; Païzis, Christos

    2018-06-17

    Nowadays, fixed gear competitions on outdoor circuits such as criteriums are regularly organized worldwide. To date, no study has investigated this alternative form of cycling. The purpose of the present study was to examine fixed gear performance indexes and to characterize physiological determinants of fixed gear cyclists. This study was carried out in two parts. Part 1 (n = 36) examined correlations between performance indexes obtained during a real fixed gear criterium (time trial, fastest laps, averaged lap time during races, fatigue indexes) and during a sprint track time trial. Part 2 (n = 9) examined correlations between the recorded performance indexes and some aerobic and anaerobic performance outputs (VO 2max , maximal aerobic power, knee extensor and knee flexor maximal voluntary torque, vertical jump height and performance during a modified Wingate test). Results from Part 1 indicated significant correlations between fixed gear final performance (i.e. average lap time during the finals) and single lap time (time trial, fastest lap during races and sprint track time trial). In addition, results from Part 2 revealed significant correlations between fixed gear performance and aerobic indicators (VO 2max and maximal aerobic power). However, no significant relationship was obtained between fixed gear cycling and anaerobic qualities such as strength. Similarly to traditional cycling disciplines, we concluded that fixed gear cycling is mainly limited by aerobic capacity, particularly criteriums final performance. However, specific skills including technical competency should be considered.

  3. Characterizing Organic Aerosol Processes and Climatically Relevant Properties via Advanced and Integrated Analyses of Aerosol Mass Spectrometry Datasets from DOE Campaigns and ACRF Measurements. Final report for DE-SC0007178

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Qi

    Organic aerosols (OA) are an important but poorly characterized component of the earth’s climate system. Enormous complexities commonly associated with OA composition and life cycle processes have significantly complicated the simulation and quantification of aerosol effects. To unravel these complexities and improve understanding of the properties, sources, formation, evolution processes, and radiative properties of atmospheric OA, we propose to perform advanced and integrated analyses of multiple DOE aerosol mass spectrometry datasets, including two high-resolution time-of-flight aerosol mass spectrometer (HR-AMS) datasets from intensive field campaigns on the aerosol life cycle and the Aerosol Chemical Speciation Monitor (ACSM) datasets from long-term routinemore » measurement programs at ACRF sites. In this project, we will focus on 1) characterizing the chemical (i.e., composition, organic elemental ratios), physical (i.e., size distribution and volatility), and radiative (i.e., sub- and super-saturated growth) properties of organic aerosols, 2) examining the correlations of these properties with different source and process regimes (e.g., primary, secondary, urban, biogenic, biomass burning, marine, or mixtures), 3) quantifying the evolutions of these properties as a function of photochemical processing, 4) identifying and characterizing special cases for important processes such as SOA formation and new particle formation and growth, and 5) correlating size-resolved aerosol chemistry with measurements of radiative properties of aerosols to determine the climatically relevant properties of OA and characterize the relationship between these properties and processes of atmospheric aerosol organics. Our primary goal is to improve a process-level understanding of the life cycle of organic aerosols in the Earth’s atmosphere. We will also aim at bridging between observations and models via synthesizing and translating the results and insights generated from

  4. Terminal hospitalizations of nursing home residents: does facility increasing the rate of do not resuscitate orders reduce them?

    PubMed

    Teno, Joan M; Gozalo, Pedro; Mitchell, Susan L; Bynum, Julie P W; Dosa, David; Mor, Vincent

    2011-06-01

    Terminal hospitalizations are costly and often avoidable with appropriate advance care planning. This study examined the association between advance care planning, as measured by facility rate of do not resuscitate (DNR) orders in U.S. nursing homes (NHs) and changes in terminal hospitalization rates. Retrospective cohort study of the changing prevalence of DNR orders in U.S. NHs. Using a fixed effect multivariate model, we examined whether increasing facility rate of DNR orders correlates with reductions in terminal hospitalizations in the last week of life, controlling for changes in facility characteristics (staffing, use of NP/PA, case mix of nursing residents, admission volume, racial composition, payer mix). The average facility rate of terminal hospitalizations was 15.5%, fluctuating between 1999 (15.0%) and 2007 (14.8%). NHs starting with low rates of DNR orders that increased their rates had fewer terminal hospital admissions in 2007 (11.2%) than facilities with continuously low DNR usage. Even after applying a multivariate fixed effect model, the effect of changes in facility DNR order rate on terminal hospitalization was -0.056 (95% confidence interval: -0.061, -0.050), indicating that for every 10% increase in DNR orders there was 0.56% decrease in terminal hospitalizations. This rate can be compared with the increase of 0.70% in the terminal hospitalization rate when an NH became disproportionately dependent on Medicaid funding or the 0.40% decrease in terminal hospitalization rate associated with adding a nurse practitioner to the clinical staff complement. NHs that changed their culture of decision making by increasing their facility rate of DNR orders decreased their rate of terminal hospitalizations. Copyright © 2011 U.S. Cancer Pain Relief Committee. Published by Elsevier Inc. All rights reserved.

  5. 48 CFR 52.243-1 - Changes-Fixed-Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Changes-Fixed-Price. 52....243-1 Changes—Fixed-Price. As prescribed in 43.205(e), insert the following clause: Changes—Fixed-Price (AUG 1987) (a) The Contracting Officer may at any time, by written order, and without notice to...

  6. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on fixed bridges. 118.65 Section 118.65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable...

  7. Fixed point theorems and dissipative processes

    NASA Technical Reports Server (NTRS)

    Hale, J. K.; Lopes, O.

    1972-01-01

    The deficiencies of the theories that characterize the maximal compact invariant set of T as asymptotically stable, and that some iterate of T has a fixed point are discussed. It is shown that this fixed point condition is always satisfied for condensing and local dissipative T. Applications are given to a class of neutral functional differential equations.

  8. Floating-to-Fixed-Point Conversion for Digital Signal Processors

    NASA Astrophysics Data System (ADS)

    Menard, Daniel; Chillet, Daniel; Sentieys, Olivier

    2006-12-01

    Digital signal processing applications are specified with floating-point data types but they are usually implemented in embedded systems with fixed-point arithmetic to minimise cost and power consumption. Thus, methodologies which establish automatically the fixed-point specification are required to reduce the application time-to-market. In this paper, a new methodology for the floating-to-fixed point conversion is proposed for software implementations. The aim of our approach is to determine the fixed-point specification which minimises the code execution time for a given accuracy constraint. Compared to previous methodologies, our approach takes into account the DSP architecture to optimise the fixed-point formats and the floating-to-fixed-point conversion process is coupled with the code generation process. The fixed-point data types and the position of the scaling operations are optimised to reduce the code execution time. To evaluate the fixed-point computation accuracy, an analytical approach is used to reduce the optimisation time compared to the existing methods based on simulation. The methodology stages are described and several experiment results are presented to underline the efficiency of this approach.

  9. Fix and forget or fix and report: a qualitative study of tensions at the front line of incident reporting.

    PubMed

    Hewitt, Tanya Anne; Chreim, Samia

    2015-05-01

    Practitioners frequently encounter safety problems that they themselves can resolve on the spot. We ask: when faced with such a problem, do practitioners fix it in the moment and forget about it, or do they fix it in the moment and report it? We consider factors underlying these two approaches. We used a qualitative case study design employing in-depth interviews with 40 healthcare practitioners in a tertiary care hospital in Ontario, Canada. We conducted a thematic analysis, and compared the findings with the literature. 'Fixing and forgetting' was the main choice that most practitioners made in situations where they faced problems that they themselves could resolve. These situations included (A) handling near misses, which were seen as unworthy of reporting since they did not result in actual harm to the patient, (B) prioritising solving individual patients' safety problems, which were viewed as unique or one-time events and (C) encountering re-occurring safety problems, which were framed as inevitable, routine events. In only a few instances was 'fixing and reporting' mentioned as a way that the providers dealt with problems that they could resolve. We found that generally healthcare providers do not prioritise reporting if a safety problem is fixed. We argue that fixing and forgetting patient safety problems encountered may not serve patient safety as well as fixing and reporting. The latter approach aligns with recent calls for patient safety to be more preventive. We consider implications for practice. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  10. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  11. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  12. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  13. 33 CFR 118.65 - Lights on fixed bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on fixed bridges. 118.65... LIGHTING AND OTHER SIGNALS § 118.65 Lights on fixed bridges. (a) Each fixed bridge span over a navigable... range of two green lights, and each margin of each navigable channel will be marked by a red light...

  14. The 'fixed cost effect' on practice management.

    PubMed

    Tipton, E F; Finley, J B

    1999-01-01

    To obtain a better understanding of the behavior of "non-professional" costs in a medical practice, the authors analyzed the expenses of a 19-doctor practice. The analysis revealed that 80 percent of these expenses were fixed costs. Fixed costs, as opposed to variable costs, remain static in total but vary on a per unit basis as volume changes. Organizations with high fixed cost must maximize capacity to achieve profitability. Thus, the relationship among volume, capacity, cost and profit must be understood by medical practices negotiating rates for service units.

  15. 40 CFR 125.136 - As an owner or operator of a new offshore oil and gas extraction facility, what must I collect...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... you are a fixed facility and your cooling water intake structure is located in an estuary or tidal... waterbody flow information. If your cooling water intake structure is located in an estuary or tidal river...

  16. 40 CFR 125.136 - As an owner or operator of a new offshore oil and gas extraction facility, what must I collect...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... you are a fixed facility and your cooling water intake structure is located in an estuary or tidal... waterbody flow information. If your cooling water intake structure is located in an estuary or tidal river...

  17. 40 CFR 125.136 - As an owner or operator of a new offshore oil and gas extraction facility, what must I collect...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... you are a fixed facility and your cooling water intake structure is located in an estuary or tidal... waterbody flow information. If your cooling water intake structure is located in an estuary or tidal river...

  18. Gaining Insight into an Organization's Fixed Assets.

    ERIC Educational Resources Information Center

    Hardy, Elisabet

    2003-01-01

    Discusses issues related to school district implementation of June 2001 Government Accounting Standards Board (GASB) Statement 34 designed to change how schools report fixed assets. Includes planning for GASB implementation, conducting fixed-asset inventories, and making time for GASB reporting. (PKP)

  19. Donation return time at fixed and mobile donation sites

    PubMed Central

    Carey, Patricia M.; High, Patrick M.; Schlumpf, Karen S.; Johnson, Bryce R.; Mast, Alan E.; Rios, Jorge A.; Simon, Toby L.; Wilkinson, Susan L.

    2013-01-01

    BACKGROUND This study investigated the effect of blood donation environment, fixed or mobile with differing sponsor types, on donation return time. STUDY DESIGN AND METHODS Data from 2006 through 2009 at six US blood centers participating in the Retrovirus Epidemiology Donor Study-II (REDS-II) were used for analysis. Descriptive statistics stratified by whole blood (WB), plateletpheresis (PP), and double red blood cell (R2) donations were obtained for fixed and mobile locations, including median number of donations and median interdonation interval. A survival analysis estimated median return time at fixed and mobile sites, while controlling for censored return times, demographics, blood center, and mandatory recovery times. RESULTS Two-thirds (67.9%) of WB donations were made at mobile sites, 97.4% of PP donations were made at fixed sites, and R2 donations were equally distributed between fixed and mobile locations. For donations at fixed sites only or alternating between fixed and mobile sites, the highest median numbers of donations were nine and eight, respectively, and the shortest model-adjusted median return times (controlling for mandatory eligibility times of 56 and 112 days) were 36 and 30 days for WB and R2 donations, respectively. For PP donations, the shortest model-adjusted median return time was 23 days at a fixed location and the longest was 693 days at community locations. CONCLUSION WB, PP, and R2 donors with the shortest time between donations were associated with fixed locations and those alternating between fixed and mobile locations, even after controlling for differing mandatory recovery times for the different blood donation procedures. PMID:21745215

  20. Gauge fixing and BFV quantization

    NASA Astrophysics Data System (ADS)

    Rogers, Alice

    2000-01-01

    Non-singularity conditions are established for the Batalin-Fradkin-Vilkovisky (BFV) gauge-fixing fermion which are sufficient for it to lead to the correct path integral for a theory with constraints canonically quantized in the BFV approach. The conditions ensure that the anticommutator of this fermion with the BRST charge regularizes the path integral by regularizing the trace over non-physical states in each ghost sector. The results are applied to the quantization of a system which has a Gribov problem, using a non-standard form of the gauge-fixing fermion.

  1. Project Nuclotron-based Ion Collider fAcility at JINR

    NASA Astrophysics Data System (ADS)

    Kekelidze, V. D.; Matveev, V. A.; Meshkov, I. N.; Sorin, A. S.; Trubnikov, G. V.

    2017-09-01

    The project of Nuclotron-based Ion Collider fAcility (NICA) that is under development at JINR (Dubna) is presented. The general goals of the project are experimental studies of both hot and dense baryonic matter and spin physics (in collisions of polarized protons and deuterons). The first program requires providing of heavy ion collisions in the energy range of √ {{s_{NN}}} = 4-11 Gev at average luminosity of L = 1 × 1027 cm-2 s-1 for 197Au79+ nuclei. The polarized beams mode is proposed to be used in energy range of √ {{s_{NN}}} = 12-27 Gev (protons at luminosity of L ≥ 1 × 1030 cm-2 s-1. The report contains description of the facility scheme and its characteristics in heavy ion operation mode. The Collider will be equipped with two detectors—MultiPurpose Detector (MPD), which is in an active stage of construction, and Spin Physics Detector (SPD) that is in the stage of conceptual design. Fixed target experiment "Baryonic matter at Nuclotron" (BM@N) will be performed in very beginning of the project. The wide program of applied researches at NICA facility is being developed as well.

  2. Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

    NASA Technical Reports Server (NTRS)

    Chevalley, Eric; Parke, Bonny; Kraut, Josh M.; Bienert, Nancy; Omar, Faisal; Palmer, Everett A.

    2015-01-01

    In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex

  3. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  4. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  5. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  6. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  7. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  8. Operational Experience of an Open-Access, Subscription-Based Mass Spectrometry and Proteomics Facility.

    PubMed

    Williamson, Nicholas A

    2018-03-01

    This paper discusses the successful adoption of a subscription-based, open-access model of service delivery for a mass spectrometry and proteomics facility. In 2009, the Mass Spectrometry and Proteomics Facility at the University of Melbourne (Australia) moved away from the standard fee for service model of service provision. Instead, the facility adopted a subscription- or membership-based, open-access model of service delivery. For a low fixed yearly cost, users could directly operate the instrumentation but, more importantly, there were no limits on usage other than the necessity to share available instrument time with all other users. All necessary training from platform staff and many of the base reagents were also provided as part of the membership cost. These changes proved to be very successful in terms of financial outcomes for the facility, instrument access and usage, and overall research output. This article describes the systems put in place as well as the overall successes and challenges associated with the operation of a mass spectrometry/proteomics core in this manner. Graphical abstract ᅟ.

  9. Operational Experience of an Open-Access, Subscription-Based Mass Spectrometry and Proteomics Facility

    NASA Astrophysics Data System (ADS)

    Williamson, Nicholas A.

    2018-03-01

    This paper discusses the successful adoption of a subscription-based, open-access model of service delivery for a mass spectrometry and proteomics facility. In 2009, the Mass Spectrometry and Proteomics Facility at the University of Melbourne (Australia) moved away from the standard fee for service model of service provision. Instead, the facility adopted a subscription- or membership-based, open-access model of service delivery. For a low fixed yearly cost, users could directly operate the instrumentation but, more importantly, there were no limits on usage other than the necessity to share available instrument time with all other users. All necessary training from platform staff and many of the base reagents were also provided as part of the membership cost. These changes proved to be very successful in terms of financial outcomes for the facility, instrument access and usage, and overall research output. This article describes the systems put in place as well as the overall successes and challenges associated with the operation of a mass spectrometry/proteomics core in this manner. [Figure not available: see fulltext.

  10. The next $120,000: a case study to illustrate analysis of alternative farm investments in fixed assets.

    PubMed

    St-Pierre, N R; Shoemaker, D; Jones, L R

    2000-05-01

    Dairy scientists specializing in the area of farm management are increasingly involved in analysis of farm investments in fixed assets. There have been instances where the wrong procedures were used to assess investments in fixed assets, leading to erroneous and possibly disastrous conclusions. A detailed case study of a dairy farm facing the decision of where best to invest an unexpected $120,000 windfall is used to illustrate the various facets of financial analysis. Indicators of profitability, liquidity, solvency, repayment capacity, and financial efficiency are explained and applied to the farm case to produce a detailed analysis of the current financial position of the firm. Long-range budgets of four alternate investment options and their impact on all financial indicators are presented. The four options are: 1) to pay down debt, 2) to purchase an additional 100 cows, 3) to install automatic milk yield recording in the parlor, and 4) to build new heifer facilities. All four investments are profitable. Therefore, an analysis limited to profitability indicators would conclude that any of the four options is a good investment. However, liquidity and financial efficiency issues showed that the option of purchasing 100 cows is far superior to the three others. We conclude that a complete and thorough financial analysis is required to evaluate the impact of long-run investments in fixed assets.

  11. New fixed-point mini-cell to investigate thermocouple drift in a high-temperature environment under neutron irradiation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laurie, M.; Vlahovic, L.; Rondinella, V.V.

    Temperature measurements in the nuclear field require a high degree of reliability and accuracy. Despite their sheathed form, thermocouples subjected to nuclear radiations undergo changes due to radiation damage and transmutation that lead to significant EMF drift during long-term fuel irradiation experiment. For the purpose of a High Temperature Reactor fuel irradiation to take place in the High Flux Reactor Petten, a dedicated fixed-point cell was jointly developed by LNE-Cnam and JRC-IET. The developed cell to be housed in the irradiation rig was tailor made to quantify the thermocouple drift during the irradiation (about two year duration) and withstand highmore » temperature (in the range 950 deg. C - 1100 deg. C) in the presence of contaminated helium in a graphite environment. Considering the different levels of temperature achieved in the irradiation facility and the large palette of thermocouple types aimed at surveying the HTR fuel pebble during the qualification test both copper (1084.62 deg. C) and gold (1064.18 deg. C) fixed-point materials were considered. The aim of this paper is to first describe the fixed-point mini-cell designed to be embedded in the reactor rig and to discuss the preliminary results achieved during some out of pile tests as much as some robustness tests representative of the reactor scram scenarios. (authors)« less

  12. International Conference on Fixed Point Theory and Applications (Colloque International Theorie Du Point Fixe et Applications)

    DTIC Science & Technology

    1989-06-09

    Theorem and the Perron - Frobenius Theorem in matrix theory. We use the Hahn-Banach theorem and do not use any fixed-point related concepts. 179 A...games defined b’, tions 87 Isac G. Fixed point theorems on convex cones , generalized pseudo-contractive mappings and the omplementarity problem 89...and (II), af(x) ° denotes the negative polar cone ot of(x). This condition are respectively called "inward" and "outward". Indeed, when X is convex

  13. 47 CFR 15.307 - Coordination with fixed microwave service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Coordination with fixed microwave service. 15... Unlicensed Personal Communications Service Devices § 15.307 Coordination with fixed microwave service. (a... Private Operational-Fixed Microwave Service (OFS) operating under part 101 of this chapter to unlicensed...

  14. 47 CFR 15.307 - Coordination with fixed microwave service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Coordination with fixed microwave service. 15... Unlicensed Personal Communications Service Devices § 15.307 Coordination with fixed microwave service. (a... Private Operational-Fixed Microwave Service (OFS) operating under part 101 of this chapter to unlicensed...

  15. Comparative Genomic Analysis of N2-Fixing and Non-N2-Fixing Paenibacillus spp.: Organization, Evolution and Expression of the Nitrogen Fixation Genes

    PubMed Central

    Xie, Jian-Bo; Du, Zhenglin; Bai, Lanqing; Tian, Changfu; Zhang, Yunzhi; Xie, Jiu-Yan; Wang, Tianshu; Liu, Xiaomeng; Chen, Xi; Cheng, Qi; Chen, Sanfeng; Li, Jilun

    2014-01-01

    We provide here a comparative genome analysis of 31 strains within the genus Paenibacillus including 11 new genomic sequences of N2-fixing strains. The heterogeneity of the 31 genomes (15 N2-fixing and 16 non-N2-fixing Paenibacillus strains) was reflected in the large size of the shell genome, which makes up approximately 65.2% of the genes in pan genome. Large numbers of transposable elements might be related to the heterogeneity. We discovered that a minimal and compact nif cluster comprising nine genes nifB, nifH, nifD, nifK, nifE, nifN, nifX, hesA and nifV encoding Mo-nitrogenase is conserved in the 15 N2-fixing strains. The nif cluster is under control of a σ70-depedent promoter and possesses a GlnR/TnrA-binding site in the promoter. Suf system encoding [Fe–S] cluster is highly conserved in N2-fixing and non-N2-fixing strains. Furthermore, we demonstrate that the nif cluster enabled Escherichia coli JM109 to fix nitrogen. Phylogeny of the concatenated NifHDK sequences indicates that Paenibacillus and Frankia are sister groups. Phylogeny of the concatenated 275 single-copy core genes suggests that the ancestral Paenibacillus did not fix nitrogen. The N2-fixing Paenibacillus strains were generated by acquiring the nif cluster via horizontal gene transfer (HGT) from a source related to Frankia. During the history of evolution, the nif cluster was lost, producing some non-N2-fixing strains, and vnf encoding V-nitrogenase or anf encoding Fe-nitrogenase was acquired, causing further diversification of some strains. In addition, some N2-fixing strains have additional nif and nif-like genes which may result from gene duplications. The evolution of nitrogen fixation in Paenibacillus involves a mix of gain, loss, HGT and duplication of nif/anf/vnf genes. This study not only reveals the organization and distribution of nitrogen fixation genes in Paenibacillus, but also provides insight into the complex evolutionary history of nitrogen fixation. PMID:24651173

  16. Cross Service Fixed-Wing Cost Estimation

    DTIC Science & Technology

    2016-05-17

    TRAC-M-TR-16-021 May 2016 Cross Service Fixed-Wing Cost Estimation TRADOC Analysis Center 700 Dyer Road Monterey, California 93943-0692 This study...Service Fixed-Wing Cost Estimation MAJ Jarrod S. Shingleton TRADOC Analysis Center 700 Dyer Road Monterey, California 93943-0692 DISTRIBUTION STATEMENT...Wing Cost Estimation MAJ Jarrod Shingleton 060312 TRADOC Analysis Center, TRAC-MTRY Naval Postgraduate School 700 Dyer Road Bldg 246 Monterey, CA 93943

  17. 29 CFR 1910.24 - Fixed industrial stairs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 5 2012-07-01 2012-07-01 false Fixed industrial stairs. 1910.24 Section 1910.24 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Walking-Working Surfaces § 1910.24 Fixed industrial stairs. (a...

  18. 5 CFR 532.105 - Pay-fixing authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Pay-fixing authority. 532.105 Section 532.105 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS General Provisions § 532.105 Pay-fixing authority. The head of each agency shall authorize...

  19. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract is ______ exclusive of the fixed fee of ______. The total estimated cost and fixed fee is ______. (End of clause) [62...

  20. 48 CFR 36.207 - Pricing fixed-price construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing fixed-price... Contracting for Construction 36.207 Pricing fixed-price construction contracts. (a) Generally, firm-fixed... methods. (b) Lump-sum pricing shall be used in preference to unit pricing except when— (1) Large...

  1. Fixed-ratio discrimination: effects of response-produced blackouts1

    PubMed Central

    Lydersen, Tore; Crossman, E. K.

    1974-01-01

    For three pigeons, reinforcement depended upon a left side-key response after execution of a fixed ratio 10 on the center key, and upon a right side-key response after fixed ratio 20. Each response during the fixed ratios produced a 0.5-sec blackout. The time between the first and last response in fixed ratio 10 was then equated with the time between the first and last response in fixed ratio 20 by increasing the blackout duration. The accuracy of side-key choice was disrupted, thereby suggesting that time, rather than number of responses, controlled choice responding. When the time between the first and last response was equated during both ratios, asymptotic accuracy was approximately equal to (two birds) or somewhat higher than (one bird) that obtained previously. The results of probes with intermediate fixed ratios and blackouts suggested that control of side-key choice had transferred from the time between the first and last response in ratios to blackout duration. PMID:16811819

  2. 49 CFR 587.18 - Dimensions of fixed rigid barrier.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) DEFORMABLE BARRIERS Offset Deformable Barrier § 587.18 Dimensions of fixed rigid barrier. (a) The fixed rigid barrier has a mass of not... 49 Transportation 7 2010-10-01 2010-10-01 false Dimensions of fixed rigid barrier. 587.18 Section...

  3. 29 CFR 1910.161 - Fixed extinguishing systems, dry chemical.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 5 2011-07-01 2011-07-01 false Fixed extinguishing systems, dry chemical. 1910.161 Section... § 1910.161 Fixed extinguishing systems, dry chemical. (a) Scope and application. This section applies to all fixed extinguishing systems, using dry chemical as the extinguishing agent, installed to meet a...

  4. 29 CFR 1910.161 - Fixed extinguishing systems, dry chemical.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Fixed extinguishing systems, dry chemical. 1910.161 Section... § 1910.161 Fixed extinguishing systems, dry chemical. (a) Scope and application. This section applies to all fixed extinguishing systems, using dry chemical as the extinguishing agent, installed to meet a...

  5. 48 CFR 236.271 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... CONTRACTS Special Aspects of Contracting for Construction 236.271 Cost-plus-fixed-fee contracts. Annual military construction appropriations acts restrict the use of cost-plus-fixed-fee contracts (see 216.306(c...

  6. 48 CFR 229.402-1 - Foreign fixed-price contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Foreign fixed-price... Foreign fixed-price contracts. Use the clause at 252.229-7000, Invoices Exclusive of Taxes or Duties, in solicitations and contracts when a fixed-price contract will be awarded to a foreign concern. ...

  7. 49 CFR 587.18 - Dimensions of fixed rigid barrier.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Dimensions of fixed rigid barrier. 587.18 Section 587.18 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Deformable Barrier § 587.18 Dimensions of fixed rigid barrier. (a) The fixed rigid barrier has a mass of not...

  8. 49 CFR 587.18 - Dimensions of fixed rigid barrier.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Dimensions of fixed rigid barrier. 587.18 Section 587.18 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Deformable Barrier § 587.18 Dimensions of fixed rigid barrier. (a) The fixed rigid barrier has a mass of not...

  9. 49 CFR 587.18 - Dimensions of fixed rigid barrier.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Dimensions of fixed rigid barrier. 587.18 Section 587.18 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Deformable Barrier § 587.18 Dimensions of fixed rigid barrier. (a) The fixed rigid barrier has a mass of not...

  10. 49 CFR 587.18 - Dimensions of fixed rigid barrier.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Dimensions of fixed rigid barrier. 587.18 Section 587.18 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Deformable Barrier § 587.18 Dimensions of fixed rigid barrier. (a) The fixed rigid barrier has a mass of not...

  11. 29 CFR 1910.161 - Fixed extinguishing systems, dry chemical.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 5 2013-07-01 2013-07-01 false Fixed extinguishing systems, dry chemical. 1910.161 Section... § 1910.161 Fixed extinguishing systems, dry chemical. (a) Scope and application. This section applies to all fixed extinguishing systems, using dry chemical as the extinguishing agent, installed to meet a...

  12. 29 CFR 1910.161 - Fixed extinguishing systems, dry chemical.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 5 2014-07-01 2014-07-01 false Fixed extinguishing systems, dry chemical. 1910.161 Section... § 1910.161 Fixed extinguishing systems, dry chemical. (a) Scope and application. This section applies to all fixed extinguishing systems, using dry chemical as the extinguishing agent, installed to meet a...

  13. 29 CFR 1910.161 - Fixed extinguishing systems, dry chemical.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 5 2012-07-01 2012-07-01 false Fixed extinguishing systems, dry chemical. 1910.161 Section... § 1910.161 Fixed extinguishing systems, dry chemical. (a) Scope and application. This section applies to all fixed extinguishing systems, using dry chemical as the extinguishing agent, installed to meet a...

  14. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  15. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  16. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  17. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  18. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  19. Wing Twist Measurements at the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Burner, Alpheus W.; Wahls, Richard A.; Goad, William K.

    1996-01-01

    A technique for measuring wing twist currently in use at the National Transonic Facility is described. The technique is based upon a single camera photogrammetric determination of two dimensional coordinates with a fixed (and known) third dimensional coordinate. The wing twist is found from a conformal transformation between wind-on and wind-off 2-D coordinates in the plane of rotation. The advantages and limitations of the technique as well as the rationale for selection of this particular technique are discussed. Examples are presented to illustrate run-to-run and test-to-test repeatability of the technique in air mode. Examples of wing twist in cryogenic nitrogen mode are also presented.

  20. 50 CFR 660.372 - Fixed gear sablefish fishery management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Fixed gear sablefish fishery management... West Coast Groundfish Fisheries § 660.372 Fixed gear sablefish fishery management. This section applies to the primary season for the fixed gear limited entry sablefish fishery north of 36° N. lat., except...

  1. The importance of fixed costs in animal health systems.

    PubMed

    Tisdell, C A; Adamson, D

    2017-04-01

    In this paper, the authors detail the structure and optimal management of health systems as influenced by the presence and level of fixed costs. Unlike variable costs, fixed costs cannot be altered, and are thus independent of the level of veterinary activity in the short run. Their importance is illustrated by using both single-period and multi-period models. It is shown that multi-stage veterinary decision-making can often be envisaged as a sequence of fixed-cost problems. In general, it becomes clear that, the higher the fixed costs, the greater the net benefit of veterinary activity must be, if such activity is to be economic. The authors also assess the extent to which it pays to reduce fixed costs and to try to compensate for this by increasing variable costs. Fixed costs have major implications for the industrial structure of the animal health products industry and for the structure of the private veterinary services industry. In the former, they favour market concentration and specialisation in the supply of products. In the latter, they foster increased specialisation. While cooperation by individual farmers may help to reduce their individual fixed costs, the organisational difficulties and costs involved in achieving this cooperation can be formidable. In such cases, the only solution is government provision of veterinary services. Moreover, international cooperation may be called for. Fixed costs also influence the nature of the provision of veterinary education.

  2. Slot angle detecting method for fiber fixed chip

    NASA Astrophysics Data System (ADS)

    Zhang, Jiaquan; Wang, Jiliang; Zhou, Chaochao

    2018-04-01

    The slot angle of fiber fixed chip has a significant impact on performance of photoelectric devices. In order to solve the actual engineering problem, this paper put forward a detecting method based on imaging processing. Because the images have very low contrast that is hardly segmented, so this paper proposes imaging segment methods based on edge character. Then get fixed chip edge line slope k2 and calculate the fiber fixed slot line slope k1, which can be used calculating the slot angle. Lastly, test the repeatability and accuracy of system, which show that this method has very fast operation speed and good robustness. Clearly, it is also satisfied to the actual demand of fiber fixed chip slot angle detection.

  3. Fixed automated spray technology.

    DOT National Transportation Integrated Search

    2011-04-19

    This research project evaluated the construction and performance of Boschungs Fixed Automated : Spray Technology (FAST) system. The FAST system automatically sprays de-icing material on : the bridge when icing conditions are about to occur. The FA...

  4. Fixing Dataset Search

    NASA Technical Reports Server (NTRS)

    Lynnes, Chris

    2014-01-01

    Three current search engines are queried for ozone data at the GES DISC. The results range from sub-optimal to counter-intuitive. We propose a method to fix dataset search by implementing a robust relevancy ranking scheme. The relevancy ranking scheme is based on several heuristics culled from more than 20 years of helping users select datasets.

  5. 10 CFR 603.305 - Use of a fixed-support TIA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Use of a fixed-support TIA. 603.305 Section 603.305 Energy... Expenditure-Based and Fixed-Support Technology Investment Agreements § 603.305 Use of a fixed-support TIA. The contracting officer may use a fixed-support TIA if: (a) The agreement is to support or stimulate RD&D with...

  6. Investigations on Two Co-C Fixed-Point Cells Prepared at INRIM and LNE-Cnam

    NASA Astrophysics Data System (ADS)

    Battuello, M.; Florio, M.; Sadli, M.; Bourson, F.

    2011-08-01

    INRIM and LNE-Cnam agreed to undertake a collaboration aimed to verify, through the use of metal-carbon eutectic fixed-point cells, methods and facilities used for defining the transition temperature of eutectic fixed points and manufacturing procedures of cells. To this purpose and as a first step of the cooperation, a Co-C cell manufactured at LNE-Cnam was measured at INRIM and compared with a local cell. The two cells were of different designs: the INRIM cell of 10 cm3 inner volume and the LNE-Cnam one of 3.9 cm3. The external dimensions of the two cells were noticeably different, namely, 40 mm in length and 24 mm in diameter for the LNE-Cnam cell 3Co4 and 110 mm in length and 42 mm in diameter for the INRIM cell. Consequently, the investigation of the effect of temperature distributions in the heating furnace was undertaken by implementing the cells inside single-zone and three-zone furnaces. The transition temperature of the cell was determined at the two institutes making use of different techniques: at INRIM radiation scales at 900 nm, 950 nm, and 1.6 μm were realized from In to Cu and then used to define T 90(Co-C) by extrapolation. At LNE-Cnam, a radiance comparator based on a grating monochromator was used for the extrapolation from the Cu fixed point. This paper presents a comparative description of the cells and the manufacturing methods and the results in terms of equivalence between the two cells and melting temperatures determined at INRIM and LNE-Cnam.

  7. 12 CFR 619.9170 - Fixed interest rate.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Fixed interest rate. 619.9170 Section 619.9170 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DEFINITIONS § 619.9170 Fixed interest rate. The rate of interest specified in the note or loan document which will prevail as the maximum...

  8. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  9. Mixed quantum/classical theory of rotationally and vibrationally inelastic scattering in space-fixed and body-fixed reference frames

    NASA Astrophysics Data System (ADS)

    Semenov, Alexander; Babikov, Dmitri

    2013-11-01

    We formulated the mixed quantum/classical theory for rotationally and vibrationally inelastic scattering process in the diatomic molecule + atom system. Two versions of theory are presented, first in the space-fixed and second in the body-fixed reference frame. First version is easy to derive and the resultant equations of motion are transparent, but the state-to-state transition matrix is complex-valued and dense. Such calculations may be computationally demanding for heavier molecules and/or higher temperatures, when the number of accessible channels becomes large. In contrast, the second version of theory requires some tedious derivations and the final equations of motion are rather complicated (not particularly intuitive). However, the state-to-state transitions are driven by real-valued sparse matrixes of much smaller size. Thus, this formulation is the method of choice from the computational point of view, while the space-fixed formulation can serve as a test of the body-fixed equations of motion, and the code. Rigorous numerical tests were carried out for a model system to ensure that all equations, matrixes, and computer codes in both formulations are correct.

  10. Potential cost-effectiveness of supervised injection facilities in Toronto and Ottawa, Canada.

    PubMed

    Enns, Eva A; Zaric, Gregory S; Strike, Carol J; Jairam, Jennifer A; Kolla, Gillian; Bayoumi, Ahmed M

    2016-03-01

    Supervised injection facilities (legally sanctioned spaces for supervised consumption of illicitly obtained drugs) are controversial public health interventions. We determined the optimal number of facilities in two Canadian cities using health economic methods. Dynamic compartmental model of HIV and hepatitis C transmission through sexual contact and sharing of drug use equipment. Toronto and Ottawa, Canada. Simulated population of each city. Zero to five supervised injection facilities. Direct health-care costs and quality-adjusted life-years (QALYs) over 20 years, discounted at 5% per year; incremental cost-effectiveness ratios. In Toronto, one facility cost $4.1 million and resulted in a gain of 385 QALYs over 20 years, for an incremental cost-effectiveness ratio (ICER) of $10,763 per QALY [95% credible interval (95CrI): cost-saving to $278,311]. Establishing one facility in Ottawa had an ICER of $6127 per QALY (95CrI: cost-saving to $179,272). At a $50,000 per QALY threshold, three facilities would be cost-effective in Toronto and two in Ottawa. The probability that establishing three, four, or five facilities in Toronto was cost-effective was 17, 21, and 41%, respectively. Establishing one, two, or three facilities in Ottawa was cost-effective with 13, 35, and 41% probability, respectively. Establishing no facility was unlikely to be the most cost-effective option (14% in Toronto and 10% in Ottawa). In both cities, results were robust if the reduction in needle-sharing among clients of the facilities was at least 50% and fixed operating costs were less than $2.0 million. Using a $50,000 per quality-adjusted life-years threshold for cost-effectiveness, it is likely to be cost-effective to establish at least three legally sanctioned spaces for supervised injection of illicitly obtained drugs in Toronto, Canada and two in Ottawa, Canada. © 2015 Society for the Study of Addiction.

  11. 48 CFR 216.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fixed-price incentive contracts. 216.403 Section 216.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Contracts 216.403 Fixed-price incentive contracts. ...

  12. A Comparative Experimental Study of Fixed Temperature and Fixed Heat Flux Boundary Conditions in Turbulent Thermal Convection

    NASA Astrophysics Data System (ADS)

    Huang, Shi-Di; Wang, Fei; Xi, Heng-Dong; Xia, Ke-Qing

    2014-11-01

    We report an experimental study of the influences of thermal boundary condition in turbulent thermal convection. Two configurations were examined: one was fixed heat flux at the bottom boundary and fixed temperature at the top (HC cells); the other was fixed temperature at both boundaries (CC cells). It is found that the flow strength in the CC cells is on average 9% larger than that in the HC ones, which could be understood as change in plume emission ability under different boundary conditions. It is further found, rather surprisingly, that flow reversals of the large-scale circulation occur more frequently in the CC cell, despite a stronger large-scale flow and more uniform temperature distribution over the boundaries. These findings provide new insights into turbulent thermal convection and should stimulate further studies, especially experimental ones. This work is supported by the Hong Kong Research Grants Council under Grant No. CUHK 403712.

  13. Adaptive fixed-time trajectory tracking control of a stratospheric airship.

    PubMed

    Zheng, Zewei; Feroskhan, Mir; Sun, Liang

    2018-05-01

    This paper addresses the fixed-time trajectory tracking control problem of a stratospheric airship. By extending the method of adding a power integrator to a novel adaptive fixed-time control method, the convergence of a stratospheric airship to its reference trajectory is guaranteed to be achieved within a fixed time. The control algorithm is firstly formulated without the consideration of external disturbances to establish the stability of the closed-loop system in fixed-time and demonstrate that the convergence time of the airship is essentially independent of its initial conditions. Subsequently, a smooth adaptive law is incorporated into the proposed fixed-time control framework to provide the system with robustness to external disturbances. Theoretical analyses demonstrate that under the adaptive fixed-time controller, the tracking errors will converge towards a residual set in fixed-time. The results of a comparative simulation study with other recent methods illustrate the remarkable performance and superiority of the proposed control method. Copyright © 2018 ISA. Published by Elsevier Ltd. All rights reserved.

  14. Fixed-interval performance and self-control in children.

    PubMed Central

    Darcheville, J C; Rivière, V; Wearden, J H

    1992-01-01

    Operant responses of 16 children (mean age 6 years and 1 month) were reinforced according to different fixed-interval schedules (with interreinforcer intervals of 20, 30, or 40 s) in which the reinforcers were either 20-s or 40-s presentations of a cartoon. In another procedure, they received training on a self-control paradigm in which both reinforcer delay (0.5 s or 40 s) and reinforcer duration (20 s or 40 s of cartoons) varied, and subjects were offered a choice between various combinations of delay and duration. Individual differences in behavior under the self-control procedure were precisely mirrored by individual differences under the fixed-interval schedule. Children who chose the smaller immediate reinforcer on the self-control procedure (impulsive) produced short postreinforcement pauses and high response rates in the fixed-interval conditions, and both measures changed little with changes in fixed-interval value. Conversely, children who chose the larger delayed reinforcer in the self-control condition (the self-controlled subjects) exhibited lower response rates and long postreinforcement pauses, which changed systematically with changes in the interval, in their fixed-interval performances. PMID:1573372

  15. Democratic Superstring Field Theory and Its Gauge Fixing

    NASA Astrophysics Data System (ADS)

    Kroyter, M.

    This work is my contribution to the proceedings of the conference``SFT2010 -- the third international conference on string field theory and related topics'' and it reflects my talk there, which described the democratic string field theory and its gauge fixing. The democratic string field theory is the only fully RNS string field theory to date. It lives in the large Hilbert space and includes all picture numbers. Picture changing amounts in this formalism to a gauge transformation. We describe the theory and its properties and show that when partially gauge fixed it can be reduced to the modified theory and to the non-polynomial theory. In the latter case we can even include the Ramond sector in the picture-fixed action. We also show that another partial gauge-fixing leads to a new consistent string field theory at picture number -1.

  16. The problem of bias when nursing facility staff administer customer satisfaction surveys.

    PubMed

    Hodlewsky, R Tamara; Decker, Frederic H

    2002-10-01

    Customer satisfaction instruments are being used with increasing frequency to assess and monitor residents' assessments of quality of care in nursing facilities. There is no standard protocol, however, for how or by whom the instruments should be administered when anonymous, written responses are not feasible. Researchers often use outside interviewers to assess satisfaction, but cost considerations may limit the extent to which facilities are able to hire outside interviewers on a regular basis. This study was designed to investigate the existence and extent of any bias caused by staff administering customer satisfaction surveys. Customer satisfaction data were collected in 1998 from 265 residents in 21 nursing facilities in North Dakota. Half the residents in each facility were interviewed by staff members and the other half by outside consultants; scores were compared by interviewer type. In addition to a tabulation of raw scores, ordinary least-squares analysis with facility fixed effects was used to control for resident characteristics and unmeasured facility-level factors that could influence scores. Significant positive bias was found when staff members interviewed residents. The bias was not limited to questions directly affecting staff responsibilities but applied across all types of issues. The bias was robust under varying constructions of satisfaction and dissatisfaction. A uniform method of survey administration appears to be important if satisfaction data are to be used to compare facilities. Bias is an important factor that should be considered and weighed against the costs of obtaining outside interviewers when assessing customer satisfaction among long term care residents.

  17. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    NASA Astrophysics Data System (ADS)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  18. Fixed mount wavefront sensor

    DOEpatents

    Neal, Daniel R.

    2000-01-01

    A rigid mount and method of mounting for a wavefront sensor. A wavefront dissector, such as a lenslet array, is rigidly mounted at a fixed distance relative to an imager, such as a CCD camera, without need for a relay imaging lens therebetween.

  19. Wall shear stress fixed points in cardiovascular fluid mechanics.

    PubMed

    Arzani, Amirhossein; Shadden, Shawn C

    2018-05-17

    Complex blood flow in large arteries creates rich wall shear stress (WSS) vectorial features. WSS acts as a link between blood flow dynamics and the biology of various cardiovascular diseases. WSS has been of great interest in a wide range of studies and has been the most popular measure to correlate blood flow to cardiovascular disease. Recent studies have emphasized different vectorial features of WSS. However, fixed points in the WSS vector field have not received much attention. A WSS fixed point is a point on the vessel wall where the WSS vector vanishes. In this article, WSS fixed points are classified and the aspects by which they could influence cardiovascular disease are reviewed. First, the connection between WSS fixed points and the flow topology away from the vessel wall is discussed. Second, the potential role of time-averaged WSS fixed points in biochemical mass transport is demonstrated using the recent concept of Lagrangian WSS structures. Finally, simple measures are proposed to quantify the exposure of the endothelial cells to WSS fixed points. Examples from various arterial flow applications are demonstrated. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Metallic and antiferromagnetic fixed points from gravity

    NASA Astrophysics Data System (ADS)

    Paul, Chandrima

    2018-06-01

    We consider SU(2) × U(1) gauge theory coupled to matter field in adjoints and study RG group flow. We constructed Callan-Symanzik equation and subsequent β functions and study the fixed points. We find there are two fixed points, showing metallic and antiferromagnetic behavior. We have shown that metallic phase develops an instability if certain parametric conditions are satisfied.

  1. 48 CFR 546.302 - Fixed-price supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Fixed-price supply contracts. 546.302 Section 546.302 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.302 Fixed-price supply contracts. ...

  2. 49 CFR 218.109 - Hand-operated fixed derails.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Hand-operated fixed derails. 218.109 Section 218.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed...

  3. 49 CFR 218.109 - Hand-operated fixed derails.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Hand-operated fixed derails. 218.109 Section 218.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed...

  4. 49 CFR 218.109 - Hand-operated fixed derails.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Hand-operated fixed derails. 218.109 Section 218.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed...

  5. 49 CFR 218.109 - Hand-operated fixed derails.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Hand-operated fixed derails. 218.109 Section 218.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed...

  6. 49 CFR 218.109 - Hand-operated fixed derails.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Hand-operated fixed derails. 218.109 Section 218.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed...

  7. Controlling cyanobacterial blooms in hypertrophic Lake Taihu, China: will nitrogen reductions cause replacement of non-N2 fixing by N2 fixing taxa?

    PubMed

    Paerl, Hans W; Xu, Hai; Hall, Nathan S; Zhu, Guangwei; Qin, Boqiang; Wu, Yali; Rossignol, Karen L; Dong, Linghan; McCarthy, Mark J; Joyner, Alan R

    2014-01-01

    Excessive anthropogenic nitrogen (N) and phosphorus (P) inputs have caused an alarming increase in harmful cyanobacterial blooms, threatening sustainability of lakes and reservoirs worldwide. Hypertrophic Lake Taihu, China's third largest freshwater lake, typifies this predicament, with toxic blooms of the non-N2 fixing cyanobacteria Microcystis spp. dominating from spring through fall. Previous studies indicate N and P reductions are needed to reduce bloom magnitude and duration. However, N reductions may encourage replacement of non-N2 fixing with N2 fixing cyanobacteria. This potentially counterproductive scenario was evaluated using replicate, large (1000 L), in-lake mesocosms during summer bloom periods. N+P additions led to maximum phytoplankton production. Phosphorus enrichment, which promoted N limitation, resulted in increases in N2 fixing taxa (Anabaena spp.), but it did not lead to significant replacement of non-N2 fixing with N2 fixing cyanobacteria, and N2 fixation rates remained ecologically insignificant. Furthermore, P enrichment failed to increase phytoplankton production relative to controls, indicating that N was the most limiting nutrient throughout this period. We propose that Microcystis spp. and other non-N2 fixing genera can maintain dominance in this shallow, highly turbid, nutrient-enriched lake by outcompeting N2 fixing taxa for existing sources of N and P stored and cycled in the lake. To bring Taihu and other hypertrophic systems below the bloom threshold, both N and P reductions will be needed until the legacy of high N and P loading and sediment nutrient storage in these systems is depleted. At that point, a more exclusive focus on P reductions may be feasible.

  8. Controlling Cyanobacterial Blooms in Hypertrophic Lake Taihu, China: Will Nitrogen Reductions Cause Replacement of Non-N2 Fixing by N2 Fixing Taxa?

    PubMed Central

    Paerl, Hans W.; Xu, Hai; Hall, Nathan S.; Zhu, Guangwei; Qin, Boqiang; Wu, Yali; Rossignol, Karen L.; Dong, Linghan; McCarthy, Mark J.; Joyner, Alan R.

    2014-01-01

    Excessive anthropogenic nitrogen (N) and phosphorus (P) inputs have caused an alarming increase in harmful cyanobacterial blooms, threatening sustainability of lakes and reservoirs worldwide. Hypertrophic Lake Taihu, China’s third largest freshwater lake, typifies this predicament, with toxic blooms of the non-N2 fixing cyanobacteria Microcystis spp. dominating from spring through fall. Previous studies indicate N and P reductions are needed to reduce bloom magnitude and duration. However, N reductions may encourage replacement of non-N2 fixing with N2 fixing cyanobacteria. This potentially counterproductive scenario was evaluated using replicate, large (1000 L), in-lake mesocosms during summer bloom periods. N+P additions led to maximum phytoplankton production. Phosphorus enrichment, which promoted N limitation, resulted in increases in N2 fixing taxa (Anabaena spp.), but it did not lead to significant replacement of non-N2 fixing with N2 fixing cyanobacteria, and N2 fixation rates remained ecologically insignificant. Furthermore, P enrichment failed to increase phytoplankton production relative to controls, indicating that N was the most limiting nutrient throughout this period. We propose that Microcystis spp. and other non-N2 fixing genera can maintain dominance in this shallow, highly turbid, nutrient-enriched lake by outcompeting N2 fixing taxa for existing sources of N and P stored and cycled in the lake. To bring Taihu and other hypertrophic systems below the bloom threshold, both N and P reductions will be needed until the legacy of high N and P loading and sediment nutrient storage in these systems is depleted. At that point, a more exclusive focus on P reductions may be feasible. PMID:25405474

  9. 48 CFR 846.302 - Fixed-price supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fixed-price supply contracts. 846.302 Section 846.302 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.302 Fixed-price supply contracts. ...

  10. 48 CFR 46.304 - Fixed-price service contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Fixed-price service contracts. 46.304 Section 46.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.304 Fixed-price service contracts. The...

  11. Implementing a comprehensive cost information system in rural health facilities: the case of Nouna health district, Burkina Faso.

    PubMed

    Flessa, Steffen; Kouyaté, Bocar

    2006-09-01

    To present first findings of a cost-of-illness (COI) information system implemented in Nouna health district, Burkina Faso. The entire project will include household and provider tangible COI, whereas this article concentrates on the development of a provider cost information system in rural first-line health facilities. Special forms and reports are prepared to routinely collect capital and recurrent costs of first-line facilities. Inventory lists are designed, and buildings and equipment are assessed by engineers. Total, fixed, variable and average costs are calculated for 15 rural health centres with five cost centres: general outpatient consultation, ambulatory nursing care, deliveries, immunization and other services (neonatal consultation, child care and family planning). In 2003, the average costs per service unit were 1.34 US$ for a general consultation, 0.51 US$ for ambulatory nursing care, 6.73 US$ per delivery, 3.64 US$ per vaccination and 1.11 US$ per service unit of other care. On average, a health centre consumes 29,900 US$ per year for a catchment population of 10,000 inhabitants. The major share of costs is fixed and does not depend on the workload of the health centre. Consequently, the costs of first-line facilities will hardly increase if the demand for health services rises. These findings can be used to improve the health financing in Nouna health district, Burkina Faso.

  12. Neither fixed nor random: weighted least squares meta-analysis.

    PubMed

    Stanley, T D; Doucouliagos, Hristos

    2015-06-15

    This study challenges two core conventional meta-analysis methods: fixed effect and random effects. We show how and explain why an unrestricted weighted least squares estimator is superior to conventional random-effects meta-analysis when there is publication (or small-sample) bias and better than a fixed-effect weighted average if there is heterogeneity. Statistical theory and simulations of effect sizes, log odds ratios and regression coefficients demonstrate that this unrestricted weighted least squares estimator provides satisfactory estimates and confidence intervals that are comparable to random effects when there is no publication (or small-sample) bias and identical to fixed-effect meta-analysis when there is no heterogeneity. When there is publication selection bias, the unrestricted weighted least squares approach dominates random effects; when there is excess heterogeneity, it is clearly superior to fixed-effect meta-analysis. In practical applications, an unrestricted weighted least squares weighted average will often provide superior estimates to both conventional fixed and random effects. Copyright © 2015 John Wiley & Sons, Ltd.

  13. 47 CFR 90.317 - Fixed ancillary signaling and data transmissions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Fixed ancillary signaling and data... Sharing) § 90.317 Fixed ancillary signaling and data transmissions. (a) Licensees of systems that have exclusive-use status in their respective geographic areas may engage in fixed ancillary signaling and data...

  14. 48 CFR 46.307 - Fixed-price research and development contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.307 Fixed-price research and development... Development—Fixed-Price, in solicitations and contracts for research and development when (1) the primary... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price research and...

  15. 49 CFR 1562.25 - Fixed base operator requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Fixed base operator requirements. 1562.25 Section 1562.25 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY... Operations § 1562.25 Fixed base operator requirements. (a) Security program. Each FBO must adopt and carry...

  16. 49 CFR 1562.25 - Fixed base operator requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Fixed base operator requirements. 1562.25 Section 1562.25 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY... Operations § 1562.25 Fixed base operator requirements. (a) Security program. Each FBO must adopt and carry...

  17. 49 CFR 1562.25 - Fixed base operator requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Fixed base operator requirements. 1562.25 Section 1562.25 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY... Operations § 1562.25 Fixed base operator requirements. (a) Security program. Each FBO must adopt and carry...

  18. 46 CFR 169.564 - Fixed extinguishing system, general.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Fixed extinguishing system, general. 169.564 Section 169.564 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.564 Fixed extinguishing system...

  19. 46 CFR 169.564 - Fixed extinguishing system, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Fixed extinguishing system, general. 169.564 Section 169.564 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.564 Fixed extinguishing system...

  20. 49 CFR 1562.25 - Fixed base operator requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Fixed base operator requirements. 1562.25 Section 1562.25 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY... Operations § 1562.25 Fixed base operator requirements. (a) Security program. Each FBO must adopt and carry...

  1. Amidine-Functionalized Poly(2-vinyl-4,4-dimethylazlactone) for Selective and Efficient CO 2 Fixing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barkakaty, Balaka; Browning, Katie L.; Sumpter, Bobby

    Development of novel polymeric materials capable of efficient CO 2 capture and separation under ambient conditions is crucial for cost-effective and practical industrial applications. Here we report the facile synthesis of a new CO 2-responsive polymer through post-polymerization modification of poly(2 vinyl-4,4-dimethylazlactone) (PVDMA). The reactive pendant azlactone groups of PVDMA are easily modified with 4-(N-methyltetrahydropyrimidine) benzyl alcohol (PBA) without any by-product formation. FTIR and TGA experiments show the new PBA functionalized polymer powder can reversibly capture CO 2 at room temperature and under atmospheric pressure. CO2 capture was selective, showing a high fixing efficiency even with a mixed gas systemmore » (20% CO 2, 80% N 2) similar to flue gas. CO 2 release occurred at room temperature and release profiles were investigated as a function of temperature. Density Functional Theory (DFT) calculations coupled with modeling and simulation reveal the presence of two CO 2 binding sites in the PBA functionalized polymer resulting in a two-step CO 2 release at room temperature. Finally, we find that the ease of material preparation, high fixing efficiency, and robust release characteristics suggest that post-polymerization modification may be a useful route to designing new materials for CO 2 capture.« less

  2. Amidine-Functionalized Poly(2-vinyl-4,4-dimethylazlactone) for Selective and Efficient CO 2 Fixing

    DOE PAGES

    Barkakaty, Balaka; Browning, Katie L.; Sumpter, Bobby; ...

    2016-02-12

    Development of novel polymeric materials capable of efficient CO 2 capture and separation under ambient conditions is crucial for cost-effective and practical industrial applications. Here we report the facile synthesis of a new CO 2-responsive polymer through post-polymerization modification of poly(2 vinyl-4,4-dimethylazlactone) (PVDMA). The reactive pendant azlactone groups of PVDMA are easily modified with 4-(N-methyltetrahydropyrimidine) benzyl alcohol (PBA) without any by-product formation. FTIR and TGA experiments show the new PBA functionalized polymer powder can reversibly capture CO 2 at room temperature and under atmospheric pressure. CO2 capture was selective, showing a high fixing efficiency even with a mixed gas systemmore » (20% CO 2, 80% N 2) similar to flue gas. CO 2 release occurred at room temperature and release profiles were investigated as a function of temperature. Density Functional Theory (DFT) calculations coupled with modeling and simulation reveal the presence of two CO 2 binding sites in the PBA functionalized polymer resulting in a two-step CO 2 release at room temperature. Finally, we find that the ease of material preparation, high fixing efficiency, and robust release characteristics suggest that post-polymerization modification may be a useful route to designing new materials for CO 2 capture.« less

  3. Walkthrough screening evaluation field guide. Natural phenomena hazards at Department of Energy facilities: Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eder, S.J.; Eli, M.W.; Salmon, M.W.

    1993-11-01

    The US Department of Energy (DOE) has a large inventory of existing facilities. Many of these facilities were not designed and constructed to current natural phenomena hazard (NPH) criteria. The NPH events include earthquakes, extreme winds and tornadoes, and floods. DOE Order 5480.28 establishes policy and requirements for NPH mitigation for DOE facilities. DOE is conducting a multiyear project to develop evaluation guidelines for assessing the condition and determining the need for upgrades at DOE facilities. One element of the NPH evaluation guidelines` development involves the existing systems and components at DOE facilities. This effort is described in detail inmore » a cited reference. In the interim period prior to availability of the final guidelines, DOE facilities are encouraged to implement an NPH walk through screening evaluation process by which systems and components that need attention can be rapidly identified. Guidelines for conducting the walk through screening evaluations are contained herein. The result of the NPH walk through screening evaluation should be a prioritized list of systems and components that need further action. Simple and inexpensive fixes for items identified in the walk through as marginal or inadequate should be implemented without further study. By implementing an NPH walk through screening evaluation, DOE facilities may realize significant reduction in risk from NPH in the short term.« less

  4. 30 CFR 56.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fixed ladder anchorage and toe clearance. 56.11005 Section 56.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Travelways § 56.11005 Fixed ladder anchorage and toe clearance. Fixed ladders shall be anchored securely and...

  5. 30 CFR 56.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fixed ladder anchorage and toe clearance. 56.11005 Section 56.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Travelways § 56.11005 Fixed ladder anchorage and toe clearance. Fixed ladders shall be anchored securely and...

  6. 30 CFR 56.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fixed ladder anchorage and toe clearance. 56.11005 Section 56.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Travelways § 56.11005 Fixed ladder anchorage and toe clearance. Fixed ladders shall be anchored securely and...

  7. 30 CFR 56.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fixed ladder anchorage and toe clearance. 56.11005 Section 56.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Travelways § 56.11005 Fixed ladder anchorage and toe clearance. Fixed ladders shall be anchored securely and...

  8. 30 CFR 56.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fixed ladder anchorage and toe clearance. 56.11005 Section 56.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Travelways § 56.11005 Fixed ladder anchorage and toe clearance. Fixed ladders shall be anchored securely and...

  9. 48 CFR 52.246-4 - Inspection of Services-Fixed-Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Fixed-Price. 52.246-4 Section 52.246-4 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.246-4 Inspection of Services—Fixed-Price. As prescribed in 46.304, insert the following clause: Inspection of Services—Fixed-Price (AUG 1996) (a) Definitions. Services, as used in this clause, includes...

  10. 48 CFR 52.249-7 - Termination (Fixed-Price Architect-Engineer).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Termination (Fixed-Price... Clauses 52.249-7 Termination (Fixed-Price Architect-Engineer). As prescribed in 49.503(b), insert the following clause in solicitations and contracts for architect-engineer services when a fixed-price contract...

  11. Coast Guard Aircraft: Transfer of Fixed-Wing C-27J Aircraft Is Complex and Further Fleet Purchases Should Coincide with Study Results

    DTIC Science & Technology

    2015-03-01

    C-27J to the Coast Guard. This report assesses (1) the status of the transfer and risks the Coast Guard faces in fielding the transferred aircraft...had transferred 2 of the 14 C-27J aircraft it is receiving from the Air Force to its aircraft maintenance facility, with plans to field 14 fully...Coast Guard continues to receive these aircraft in the near term, the capability and cost of the Coast Guard’s fixed-wing fleet runs the risk of being

  12. 46 CFR 169.565 - Fixed carbon dioxide system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Fixed carbon dioxide system. 169.565 Section 169.565 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.565 Fixed carbon dioxide system. (a) The...

  13. 48 CFR 52.246-2 - Inspection of Supplies-Fixed-Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Fixed-Price. 52.246-2 Section 52.246-2 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.246-2 Inspection of Supplies—Fixed-Price. As prescribed in 46.302, insert the following clause: Inspection of Supplies—Fixed-Price (AUG 1996) (a) Definition. Supplies, as used in this clause, includes but...

  14. 46 CFR 184.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Electronic position fixing devices. 184.410 Section 184.410 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER... Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position...

  15. 46 CFR 184.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Electronic position fixing devices. 184.410 Section 184.410 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER... Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position...

  16. 46 CFR 184.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electronic position fixing devices. 184.410 Section 184.410 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER... Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position...

  17. 46 CFR 184.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Electronic position fixing devices. 184.410 Section 184.410 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER... Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position...

  18. 46 CFR 184.410 - Electronic position fixing devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Electronic position fixing devices. 184.410 Section 184.410 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER... Electronic position fixing devices. A vessel on an oceans route must be equipped with an electronic position...

  19. Is the Price Right? An Analysis of ETP's Fixed Fees.

    ERIC Educational Resources Information Center

    Moore, Richard W.; Blake, Daniel R.; Honig, Michele L.; Cohen, Michael D.

    The Employment Training Panel (ETP) contracted with California State University-Northridge to review the fixed fee structure ETP used to pay contractors for training provided under ETP. Three research questions were investigated: what other institutions use the fixed fee and what they pay for; whether ETP's fixed-fee rates were reasonable in…

  20. Combined GPS/GLONASS Precise Point Positioning with Fixed GPS Ambiguities

    PubMed Central

    Pan, Lin; Cai, Changsheng; Santerre, Rock; Zhu, Jianjun

    2014-01-01

    Precise point positioning (PPP) technology is mostly implemented with an ambiguity-float solution. Its performance may be further improved by performing ambiguity-fixed resolution. Currently, the PPP integer ambiguity resolutions (IARs) are mainly based on GPS-only measurements. The integration of GPS and GLONASS can speed up the convergence and increase the accuracy of float ambiguity estimates, which contributes to enhancing the success rate and reliability of fixing ambiguities. This paper presents an approach of combined GPS/GLONASS PPP with fixed GPS ambiguities (GGPPP-FGA) in which GPS ambiguities are fixed into integers, while all GLONASS ambiguities are kept as float values. An improved minimum constellation method (MCM) is proposed to enhance the efficiency of GPS ambiguity fixing. Datasets from 20 globally distributed stations on two consecutive days are employed to investigate the performance of the GGPPP-FGA, including the positioning accuracy, convergence time and the time to first fix (TTFF). All datasets are processed for a time span of three hours in three scenarios, i.e., the GPS ambiguity-float solution, the GPS ambiguity-fixed resolution and the GGPPP-FGA resolution. The results indicate that the performance of the GPS ambiguity-fixed resolutions is significantly better than that of the GPS ambiguity-float solutions. In addition, the GGPPP-FGA improves the positioning accuracy by 38%, 25% and 44% and reduces the convergence time by 36%, 36% and 29% in the east, north and up coordinate components over the GPS-only ambiguity-fixed resolutions, respectively. Moreover, the TTFF is reduced by 27% after adding GLONASS observations. Wilcoxon rank sum tests and chi-square two-sample tests are made to examine the significance of the improvement on the positioning accuracy, convergence time and TTFF. PMID:25237901

  1. Niamey Aerosol Optical Depths

    DOE Data Explorer

    Flynn, Connor

    2008-10-01

    MFRSR irradiance data collected during the ACRF AMF deployment in Niamey, Niger have been used to derive AOD for five wavelength channels of the MFRSR. These data have been corrected to adjust for filter drift over the course of the campaign and contamination due to forward scattering as a result of large dust particles in the atmosphere around Niamey.

  2. Accessibility to health care facilities in Montreal Island: an application of relative accessibility indicators from the perspective of senior and non-senior residents.

    PubMed

    Paez, Antonio; Mercado, Ruben G; Farber, Steven; Morency, Catherine; Roorda, Matthew

    2010-10-25

    Geographical access to health care facilities is known to influence health services usage. As societies age, accessibility to health care becomes an increasingly acute public health concern. It is known that seniors tend to have lower mobility levels, and it is possible that this may negatively affect their ability to reach facilities and services. Therefore, it becomes important to examine the mobility situation of seniors vis-a-vis the spatial distribution of health care facilities, to identify areas where accessibility is low and interventions may be required. Accessibility is implemented using a cumulative opportunities measure. Instead of assuming a fixed bandwidth (i.e. a distance threshold) for measuring accessibility, in this paper the bandwidth is defined using model-based estimates of average trip length. Average trip length is an all-purpose indicator of individual mobility and geographical reach. Adoption of a spatial modelling approach allows us to tailor these estimates of travel behaviour to specific locations and person profiles. Replacing a fixed bandwidth with these estimates permits us to calculate customized location- and person-based accessibility measures that allow inter-personal as well as geographical comparisons. The case study is Montreal Island. Geo-coded travel behaviour data, specifically average trip length, and relevant traveller's attributes are obtained from the Montreal Household Travel Survey. These data are complemented with information from the Census. Health care facilities, also geo-coded, are extracted from a comprehensive business point database. Health care facilities are selected based on Standard Industrial Classification codes 8011-21 (Medical Doctors and Dentists). Model-based estimates of average trip length show that travel behaviour varies widely across space. With the exception of seniors in the downtown area, older residents of Montreal Island tend to be significantly less mobile than people of other age cohorts

  3. 46 CFR 169.565 - Fixed carbon dioxide system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Fixed carbon dioxide system. 169.565 Section 169.565 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.565 Fixed carbon dioxide system. (a) The number of pounds of carbon dioxide...

  4. 46 CFR 169.565 - Fixed carbon dioxide system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Fixed carbon dioxide system. 169.565 Section 169.565 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.565 Fixed carbon dioxide system. (a) The number of pounds of carbon dioxide...

  5. 46 CFR 169.565 - Fixed carbon dioxide system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Fixed carbon dioxide system. 169.565 Section 169.565 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Lifesaving and Firefighting Equipment Firefighting Equipment § 169.565 Fixed carbon dioxide system. (a) The number of pounds of carbon dioxide...

  6. 29 CFR 1910.160 - Fixed extinguishing systems, general.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sprinkler systems which are covered by § 1910.159. (2) This section also applies to fixed systems not... flooding systems by means of an approved fire detection device installed and interconnected with a pre... 29 Labor 5 2012-07-01 2012-07-01 false Fixed extinguishing systems, general. 1910.160 Section 1910...

  7. 29 CFR 1910.160 - Fixed extinguishing systems, general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sprinkler systems which are covered by § 1910.159. (2) This section also applies to fixed systems not... flooding systems by means of an approved fire detection device installed and interconnected with a pre... 29 Labor 5 2011-07-01 2011-07-01 false Fixed extinguishing systems, general. 1910.160 Section 1910...

  8. 29 CFR 1910.160 - Fixed extinguishing systems, general.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sprinkler systems which are covered by § 1910.159. (2) This section also applies to fixed systems not... flooding systems by means of an approved fire detection device installed and interconnected with a pre... 29 Labor 5 2013-07-01 2013-07-01 false Fixed extinguishing systems, general. 1910.160 Section 1910...

  9. 29 CFR 1910.160 - Fixed extinguishing systems, general.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sprinkler systems which are covered by § 1910.159. (2) This section also applies to fixed systems not... flooding systems by means of an approved fire detection device installed and interconnected with a pre... 29 Labor 5 2014-07-01 2014-07-01 false Fixed extinguishing systems, general. 1910.160 Section 1910...

  10. 46 CFR 169.564 - Fixed extinguishing system, general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., general. (a) A fixed carbon dioxide, Halon 1301, or clean agent extinguishing system must be installed to... open to the atmosphere as to make the use of a fixed system ineffective; (2) Any paint or oil room, or... an approved carbon dioxide, Halon 1301, halogenated, or clean agent type and installed to the...

  11. 46 CFR 169.564 - Fixed extinguishing system, general.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., general. (a) A fixed carbon dioxide, Halon 1301, or clean agent extinguishing system must be installed to... open to the atmosphere as to make the use of a fixed system ineffective; (2) Any paint or oil room, or... an approved carbon dioxide, Halon 1301, halogenated, or clean agent type and installed to the...

  12. 46 CFR 169.564 - Fixed extinguishing system, general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., general. (a) A fixed carbon dioxide, Halon 1301, or clean agent extinguishing system must be installed to... open to the atmosphere as to make the use of a fixed system ineffective; (2) Any paint or oil room, or... an approved carbon dioxide, Halon 1301, halogenated, or clean agent type and installed to the...

  13. Military Personnel: Enhanced Collaboration and Process Improvements Needed for Determining Military Treatment Facility Medical Personnel Requirements

    DTIC Science & Technology

    2010-07-01

    Department of Defense (DOD) are in great demand due to projected nationwide medical personnel shortages over the next decade and are essential to...for the first year, in order to assist the services in addressing near- term personnel shortages . It also provides a consistent staffing standard...dentists, medical service corps, and veterinarians , to name a few, at the work center level across Army fixed military treatment facilities. The model uses

  14. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2011-02-01

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the currentmore » year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather

  15. Classification of Reactor Facility Operational State Using SPRT Methods with Radiation Sensor Networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramirez Aviles, Camila A.; Rao, Nageswara S.

    We consider the problem of inferring the operational state of a reactor facility by using measurements from a radiation sensor network, which is deployed around the facility’s ventilation stack. The radiation emissions from the stack decay with distance, and the corresponding measurements are inherently random with parameters determined by radiation intensity levels at the sensor locations. We fuse measurements from network sensors to estimate the intensity at the stack, and use this estimate in a one-sided Sequential Probability Ratio Test (SPRT) to infer the on/off state of the reactor facility. We demonstrate the superior performance of this method over conventionalmore » majority vote fusers and individual sensors using (i) test measurements from a network of NaI sensors, and (ii) emulated measurements using radioactive effluents collected at a reactor facility stack. We analytically quantify the performance improvements of individual sensors and their networks with adaptive thresholds over those with fixed ones, by using the packing number of the radiation intensity space.« less

  16. Ownership, competition, and the adoption of new technologies and cost-saving practices in a fixed-price environment.

    PubMed

    Hirth, R A; Chernew, M E; Orzol, S M

    2000-01-01

    Advances in medical technology have been implicated as the primary cause of rising health care expenditures. It is not yet known whether the increasing prevalence of managed care mechanisms, particularly capitation, will change substantially incentives for acquiring and using cost-increasing innovations. We examined the decisions of dialysis units (a set of providers that has faced capitation and real decreases in payment for several decades) with respect to use of cost-increasing technologies that enhance quality of care, cost-cutting practices that reduce quality of care, and amenities desired by patients that are unrelated to quality of care. We found that the dialysis payment system does not appear to have blocked access to a number of new, quality-enhancing technologies that were developed in the 1980s. However, facilities made adjustments along other valuable margins to facilitate adoption of these technologies; use of new technologies varied with numerous facility, regulatory, and case-mix characteristics including ownership, chain membership, size, market competition, and certificate of need programs. Interestingly, the trade-offs made by for-profit and nonprofit facilities when faced with fixed prices appeared quite different. For-profits tended to deliver lower technical quality of care but more amenities, while nonprofits favored technical quality of care over amenities. Our findings may have implications for the response of other types of health care providers to capitation and increasing economic constraints.

  17. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  18. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  19. 50 CFR 660.211 - Fixed gear fishery-definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... vessel registered to a limited entry fixed gear permit(s) with a Tier 1, Tier 2, and/or Tier 3... fishery or sablefish tier limit fishery means, for the limited entry fixed gear sablefish fishery north of... tier limit and when they are not eligible to fish in the DTL fishery. Sablefish primary season means...

  20. [Microanalytical determinations of gold alloys for fixed dentures].

    PubMed

    Lotito, M; Negri, P; Fraschini, M

    1993-01-01

    In this work the authors analyse gold alloys for fixed prosthesis by X-ray spectrometry in energy dispersion (EDS). The results of this analysis, given in graphic and table form, show remarkable differences in alloy composition. For this reason recommended dentists are to be attentive and severe in the control of gold alloys for fixed prosthesis.

  1. Downgrading Nuclear Facilities to Radiological Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarry, Jeffrey F.; Farr, Jesse Oscar; Duran, Leroy

    2015-08-01

    Based on inventory reductions and the use of alternate storage facilities, the Sandia National Laboratories (SNL) downgraded 4 SNL Hazard Category 3 (HC-3) nuclear facilities to less-than-HC-3 radiological facilities. SNL’s Waste Management and Pollution Prevention Department (WMPPD) managed the HC-3 nuclear facilities and implemented the downgrade. This paper will examine the downgrade process,

  2. Effect of Fixed Metallic Oral Appliances on Oral Health.

    PubMed

    Alnazzawi, Ahmad

    2018-01-01

    There is a substantial proportion of the population using fixed metallic oral appliances, such as crowns and bridges, which are composed of various dental alloys. These restorations may be associated with a number of effects on oral health with variable degrees of severity, to review potential effects of using fixed metallic oral appliances, fabricated from various alloys. The MEDLINE/PubMed database was searched using certain combinations of keywords related to the topic. The search revealed that burning mouth syndrome, oral pigmentation, hypersensitivity and lichenoid reactions, and genotoxic and cytotoxic effects are the major potential oral health changes associated with fixed prosthodontic appliances. Certain oral disorders are associated with the use of fixed metallic oral appliances. Patch test is the most reliable method that can be applied for identifying metal allergy, and the simultaneous use of different alloys in the mouth is discouraged.

  3. ConSpeciFix: Classifying prokaryotic species based on gene flow.

    PubMed

    Bobay, Louis-Marie; Ellis, Brian Shin-Hua; Ochman, Howard

    2018-05-16

    Classification of prokaryotic species is usually based on sequence similarity thresholds, which are easy to apply but lack a biologically-relevant foundation. Here, we present ConSpeciFix, a program that classifies prokaryotes into species using criteria set forth by the Biological Species Concept, thereby unifying species definition in all domains of life. ConSpeciFix's webserver is freely available at www.conspecifix.com. The local version of the program can be freely downloaded from https://github.com/Bobay-Ochman/ConSpeciFix. ConSpeciFix is written in Python 2.7 and requires the following dependencies: Usearch, MCL, MAFFT and RAxML. ljbobay@uncg.edu.

  4. Fixed-time stabilization of impulsive Cohen-Grossberg BAM neural networks.

    PubMed

    Li, Hongfei; Li, Chuandong; Huang, Tingwen; Zhang, Wanli

    2018-02-01

    This article is concerned with the fixed-time stabilization for impulsive Cohen-Grossberg BAM neural networks via two different controllers. By using a novel constructive approach based on some comparison techniques for differential inequalities, an improvement theorem of fixed-time stability for impulsive dynamical systems is established. In addition, based on the fixed-time stability theorem of impulsive dynamical systems, two different control protocols are designed to ensure the fixed-time stabilization of impulsive Cohen-Grossberg BAM neural networks, which include and extend the earlier works. Finally, two simulations examples are provided to illustrate the validity of the proposed theoretical results. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. 48 CFR 216.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fixed-price contracts with economic price adjustment. 216.203 Section 216.203 Federal Acquisition Regulations System DEFENSE... CONTRACTS Fixed-Price Contracts 216.203 Fixed-price contracts with economic price adjustment. ...

  6. 48 CFR 216.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Fixed-price contracts with economic price adjustment. 216.203 Section 216.203 Federal Acquisition Regulations System DEFENSE... CONTRACTS Fixed-Price Contracts 216.203 Fixed-price contracts with economic price adjustment. ...

  7. 48 CFR 216.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Fixed-price contracts with economic price adjustment. 216.203 Section 216.203 Federal Acquisition Regulations System DEFENSE... CONTRACTS Fixed-Price Contracts 216.203 Fixed-price contracts with economic price adjustment. ...

  8. 48 CFR 216.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Fixed-price contracts with economic price adjustment. 216.203 Section 216.203 Federal Acquisition Regulations System DEFENSE... CONTRACTS Fixed-Price Contracts 216.203 Fixed-price contracts with economic price adjustment. ...

  9. 48 CFR 216.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Fixed-price contracts with economic price adjustment. 216.203 Section 216.203 Federal Acquisition Regulations System DEFENSE... CONTRACTS Fixed-Price Contracts 216.203 Fixed-price contracts with economic price adjustment. ...

  10. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  11. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  12. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  13. Analyzing and Predicting Effort Associated with Finding and Fixing Software Faults

    NASA Technical Reports Server (NTRS)

    Hamill, Maggie; Goseva-Popstojanova, Katerina

    2016-01-01

    Context: Software developers spend a significant amount of time fixing faults. However, not many papers have addressed the actual effort needed to fix software faults. Objective: The objective of this paper is twofold: (1) analysis of the effort needed to fix software faults and how it was affected by several factors and (2) prediction of the level of fix implementation effort based on the information provided in software change requests. Method: The work is based on data related to 1200 failures, extracted from the change tracking system of a large NASA mission. The analysis includes descriptive and inferential statistics. Predictions are made using three supervised machine learning algorithms and three sampling techniques aimed at addressing the imbalanced data problem. Results: Our results show that (1) 83% of the total fix implementation effort was associated with only 20% of failures. (2) Both safety critical failures and post-release failures required three times more effort to fix compared to non-critical and pre-release counterparts, respectively. (3) Failures with fixes spread across multiple components or across multiple types of software artifacts required more effort. The spread across artifacts was more costly than spread across components. (4) Surprisingly, some types of faults associated with later life-cycle activities did not require significant effort. (5) The level of fix implementation effort was predicted with 73% overall accuracy using the original, imbalanced data. Using oversampling techniques improved the overall accuracy up to 77%. More importantly, oversampling significantly improved the prediction of the high level effort, from 31% to around 85%. Conclusions: This paper shows the importance of tying software failures to changes made to fix all associated faults, in one or more software components and/or in one or more software artifacts, and the benefit of studying how the spread of faults and other factors affect the fix implementation

  14. 48 CFR 28.306 - Insurance under fixed-price contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... requirements under fixed-price contracts. Examples of such circumstances include the following: (1) The...-price contracts. 28.306 Section 28.306 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 28.306 Insurance under fixed-price...

  15. N2-fixing red alder indirectly accelerates ecosystem nitrogen cycling

    USGS Publications Warehouse

    Perakis, Steven S.; Matkins, Joselin J.; Hibbs, David E.

    2012-01-01

    Symbiotic N2-fixing tree species can accelerate ecosystem N dynamics through decomposition via direct pathways by producing readily decomposed leaf litter and increasing N supply to decomposers, as well as via indirect pathways by increasing tissue and detrital N in non-fixing vegetation. To evaluate the relative importance of these pathways, we compared three-year decomposition and N dynamics of N2-fixing red alder leaf litter (2.34 %N) to both low-N (0.68 %N) and high-N (1.21 %N) litter of non-fixing Douglas-fir, and decomposed each litter source in four forests dominated by either red alder or Douglas-fir. We also used experimental N fertilization of decomposition plots to assess elevated N availability as a potential mechanism of N2-fixer effects on litter mass loss and N dynamics. Direct effects of N2-fixing red alder on decomposition occurred primarily as faster N release from red alder than Douglas-fir litter, but direct increases in N supply to decomposers via fertilization did not stimulate decomposition of any litter. Fixed N indirectly influenced detrital dynamics by increasing Douglas-fir tissue and litter N concentrations, which accelerated litter N release without accelerating mass loss. By increasing soil N, tissue N, and the rate of N release from litter of non-fixers, we conclude that N2-fixing vegetation can indirectly foster plant-soil feedbacks that contribute to the persistence of elevated N availability in terrestrial ecosystems.

  16. Fixed-interval matching-to-sample: intermatching time and intermatching error runs1

    PubMed Central

    Nelson, Thomas D.

    1978-01-01

    Four pigeons were trained on a matching-to-sample task in which reinforcers followed either the first matching response (fixed interval) or the fifth matching response (tandem fixed-interval fixed-ratio) that occurred 80 seconds or longer after the last reinforcement. Relative frequency distributions of the matching-to-sample responses that concluded intermatching times and runs of mismatches (intermatching error runs) were computed for the final matching responses directly followed by grain access and also for the three matching responses immediately preceding the final match. Comparison of these two distributions showed that the fixed-interval schedule arranged for the preferential reinforcement of matches concluding relatively extended intermatching times and runs of mismatches. Differences in matching accuracy and rate during the fixed interval, compared to the tandem fixed-interval fixed-ratio, suggested that reinforcers following matches concluding various intermatching times and runs of mismatches influenced the rate and accuracy of the last few matches before grain access, but did not control rate and accuracy throughout the entire fixed-interval period. PMID:16812032

  17. THE EFFECTS OF FIXED VERSUS ESCALATING REINFORCEMENT SCHEDULES ON SMOKING ABSTINENCE

    PubMed Central

    Romanowich, Paul; Lamb, R. J.

    2015-01-01

    Studies indicate that when abstinence is initiated, escalating reinforcement schedules maintain continuous abstinence longer than fixed reinforcement schedules. However, these studies were conducted for shorter durations than most clinical trials and also resulted in larger reinforcer value for escalating participants during the 1st week of the experiment. We tested whether escalating reinforcement schedules maintained abstinence longer than fixed reinforcement schedules in a 12-week clinical trial. Smokers (146) were randomized to an escalating reinforcement schedule, a fixed reinforcement schedule, or a control condition. Escalating reinforcement participants received $5.00 for their first breath carbon monoxide (CO) sample <3 ppm, with a $0.50 increase for each consecutive sample. Fixed reinforcement participants received $19.75 for each breath CO sample <3 ppm. Control participants received payments only for delivering a breath CO sample. Similar proportions of escalating and fixed reinforcement participants met the breath CO criterion at least once. Escalating reinforcement participants maintained criterion breath CO levels longer than fixed reinforcement and control participants. Similar to previous short-term studies, escalating reinforcement schedules maintained longer durations of abstinence than fixed reinforcement schedules during a clinical trial. PMID:25640764

  18. 48 CFR 3016.203 - Fixed price contracts with economic price adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fixed price contracts with economic price adjustments. 3016.203 Section 3016.203 Federal Acquisition Regulations System DEPARTMENT OF... TYPES OF CONTRACTS Fixed-Price Contracts 3016.203 Fixed price contracts with economic price adjustments. ...

  19. 48 CFR 3016.203 - Fixed price contracts with economic price adjustments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Fixed price contracts with economic price adjustments. 3016.203 Section 3016.203 Federal Acquisition Regulations System DEPARTMENT OF... TYPES OF CONTRACTS Fixed-Price Contracts 3016.203 Fixed price contracts with economic price adjustments. ...

  20. 48 CFR 3016.203 - Fixed price contracts with economic price adjustments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Fixed price contracts with economic price adjustments. 3016.203 Section 3016.203 Federal Acquisition Regulations System DEPARTMENT OF... TYPES OF CONTRACTS Fixed-Price Contracts 3016.203 Fixed price contracts with economic price adjustments. ...

  1. 48 CFR 3016.203 - Fixed price contracts with economic price adjustments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Fixed price contracts with economic price adjustments. 3016.203 Section 3016.203 Federal Acquisition Regulations System DEPARTMENT OF... TYPES OF CONTRACTS Fixed-Price Contracts 3016.203 Fixed price contracts with economic price adjustments. ...

  2. 48 CFR 3016.203 - Fixed price contracts with economic price adjustments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Fixed price contracts with economic price adjustments. 3016.203 Section 3016.203 Federal Acquisition Regulations System DEPARTMENT OF... TYPES OF CONTRACTS Fixed-Price Contracts 3016.203 Fixed price contracts with economic price adjustments. ...

  3. Gingival Retraction Methods for Fabrication of Fixed Partial Denture: Literature Review.

    PubMed

    S, Safari; Ma, Vossoghi Sheshkalani; Mi, Vossoghi Sheshkalani; F, Hoseini Ghavam; M, Hamedi

    2016-06-01

    Fixed dental prosthesis success requires appropriate impression taking of the prepared finish line. This is critical in either tooth supported fixed prosthesis (crown and bridge) or implant supported fixed prosthesis (solid abutment). If the prepared finish line is adjacent to the gingival sulcus, gingival retraction techniques should be used to decrease the marginal discrepancy among the restoration and the prepared abutment. Accurate marginal positioning of the restoration in the prepared finish line of the abutment is required for therapeutic, preventive and aesthetic purposes. In this article, conventional and modern methods of gingival retraction in the fixed tooth supported prosthesis and fixed implant supported prosthesis are expressed. PubMed and Google Scholar databases were searched manually for studies on gingival tissue managements prior to impression making in fixed dental prosthesis since 1975. Conclusions were extracted and summarized. Keywords were impression making, gingival retraction, cordless retraction, and implant. Gingival retraction techniques can be classified as mechanical, chemical or surgical. In this article, different gingival management techniques are discussed.

  4. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  5. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  6. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  7. 47 CFR 15.307 - Coordination with fixed microwave service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Coordination with fixed microwave service. 15.307 Section 15.307 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unlicensed Personal Communications Service Devices § 15.307 Coordination with fixed microwave service. Each...

  8. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  9. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  10. 47 CFR 15.307 - Coordination with fixed microwave service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Coordination with fixed microwave service. 15.307 Section 15.307 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unlicensed Personal Communications Service Devices § 15.307 Coordination with fixed microwave service. Each...

  11. 47 CFR 15.307 - Coordination with fixed microwave service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Coordination with fixed microwave service. 15.307 Section 15.307 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unlicensed Personal Communications Service Devices § 15.307 Coordination with fixed microwave service. Each...

  12. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron-Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2008-06-01

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consentmore » Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100

  13. 46 CFR 131.815 - Alarm for fixed gaseous fire-extinguishing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Alarm for fixed gaseous fire-extinguishing system. 131... VESSELS OPERATIONS Markings for Fire Equipment and Emergency Equipment § 131.815 Alarm for fixed gaseous fire-extinguishing system. Each alarm for a fixed gaseous fire-extinguishing system must be...

  14. 46 CFR 131.815 - Alarm for fixed gaseous fire-extinguishing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Alarm for fixed gaseous fire-extinguishing system. 131... VESSELS OPERATIONS Markings for Fire Equipment and Emergency Equipment § 131.815 Alarm for fixed gaseous fire-extinguishing system. Each alarm for a fixed gaseous fire-extinguishing system must be...

  15. Low-dose fixed-target serial synchrotron crystallography.

    PubMed

    Owen, Robin L; Axford, Danny; Sherrell, Darren A; Kuo, Anling; Ernst, Oliver P; Schulz, Eike C; Miller, R J Dwayne; Mueller-Werkmeister, Henrike M

    2017-04-01

    The development of serial crystallography has been driven by the sample requirements imposed by X-ray free-electron lasers. Serial techniques are now being exploited at synchrotrons. Using a fixed-target approach to high-throughput serial sampling, it is demonstrated that high-quality data can be collected from myoglobin crystals, allowing room-temperature, low-dose structure determination. The combination of fixed-target arrays and a fast, accurate translation system allows high-throughput serial data collection at high hit rates and with low sample consumption.

  16. Nonquadratic gauge fixing and ghosts for gauge theories on the hypersphere

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, F. T.; McKeon, D. G. C.; Department of Mathematics and Computer Science, Algoma University, Sault St. Marie, Ontario P6A 2G4

    2011-10-15

    It has been suggested that using a gauge fixing Lagrangian that is not quadratic in a gauge fixing condition is most appropriate for gauge theories formulated on a hypersphere. We reexamine the appropriate ghost action that is to be associated with gauge fixing, applying a technique that has been used for ensuring that the propagator for a massless spin-two field is transverse and traceless. It is shown that this nonquadratic gauge fixing Lagrangian leads to two pair of complex Fermionic ghosts and two Bosonic real ghosts.

  17. Fixed partial dentures investigated by optical coherent tomography

    NASA Astrophysics Data System (ADS)

    Sinescu, Cosmin; Negrutiu, Meda; Todea, Carmen; Hughes, Mike; Tudorache, Florin; Podoleanu, Adrian G.

    2008-02-01

    Fixed partial prostheses as integral ceramics, integral polymers, metal ceramics or metal polymers bridges, are mainly used in the frontal part of the dental arch (especially the integral bridges). They have to satisfy high stress requirements as well as esthetic. The masticatory stress may induce fractures of the bridges. These may be triggered by initial materials defects or by alterations of the technological process. The fractures of these bridges lead to functional, esthetic and phonetic disturbances which finally render the prosthetic treatment inefficient. The purpose of this study is to evaluate the capability of en-face optical coherence tomography (OCT) in detection and analysis of possible fractures in several integral fixed partial dentures. The materials used were represented by several fixed partial prostheses, integral ceramics, integral polymers, metal ceramics and metal polymers bridges. In order to discover the defects, scanning was performed from incisal, vestibular, oral and cervical directions material defects such as fractures and pores were investigated using OCT. In conclusion, en-face OCT has proven as a valuable non invasive method to investigate fixed partial prostheses before their insertion in the oral cavity.

  18. 48 CFR 629.402-1 - Foreign fixed-price contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Foreign fixed-price contracts. 629.402-1 Section 629.402-1 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 629.402-1 Foreign fixed-price contracts. ...

  19. Fiber-reinforced composite fixed dental prostheses: two clinical reports.

    PubMed

    Zarow, Maciej; Paisley, Carl Stuart; Krupinski, Jerzy; Brunton, Paul Anthony

    2010-06-01

    Various options are available in clinical practice for the replacement of a single missing tooth, ranging from conventional fixed and removable dental prostheses to a single implant-supported crown. There are situations in which a semipermanent fixed dental prosthesis may be desirable, particularly for patients who have completed orthodontic treatment but are too young to embark on implant therapy. Following advances in fiber-reinforcement technology, fiber-reinforced composite resin (FRC) now represents a lower-cost alternative to traditional metal-ceramic for the construction of resin-bonded prostheses. Two case reports illustrate the use of FRC prostheses as fixed semipermanent_restorations.

  20. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  1. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  2. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  3. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  4. 46 CFR 132.310 - Fixed fire-extinguishing systems for paint lockers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Fixed fire-extinguishing systems for paint lockers. 132... lockers. (a) Except as provided by paragraph (b) of this section, a fixed gaseous fire-extinguishing system or another approved fixed fire-extinguishing system must be installed in each paint locker. (b) No...

  5. 29 CFR 1910.163 - Fixed extinguishing systems, water spray and foam.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 5 2013-07-01 2013-07-01 false Fixed extinguishing systems, water spray and foam. 1910.163 Section 1910.163 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Fire Protection Fixed Fire Suppression Equipment § 1910.163 Fixed...

  6. 14 CFR 45.25 - Location of marks on fixed-wing aircraft.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION AIRCRAFT IDENTIFICATION AND REGISTRATION MARKING Nationality and Registration Marks § 45.25 Location of marks on fixed-wing aircraft. (a) The operator of a fixed-wing aircraft shall display the... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Location of marks on fixed-wing aircraft...

  7. 14 CFR 45.25 - Location of marks on fixed-wing aircraft.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... TRANSPORTATION AIRCRAFT IDENTIFICATION AND REGISTRATION MARKING Nationality and Registration Marks § 45.25 Location of marks on fixed-wing aircraft. (a) The operator of a fixed-wing aircraft must display the... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Location of marks on fixed-wing aircraft...

  8. 14 CFR 45.25 - Location of marks on fixed-wing aircraft.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... TRANSPORTATION AIRCRAFT IDENTIFICATION AND REGISTRATION MARKING Nationality and Registration Marks § 45.25 Location of marks on fixed-wing aircraft. (a) The operator of a fixed-wing aircraft must display the... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Location of marks on fixed-wing aircraft...

  9. 14 CFR 45.25 - Location of marks on fixed-wing aircraft.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... TRANSPORTATION AIRCRAFT IDENTIFICATION AND REGISTRATION MARKING Nationality and Registration Marks § 45.25 Location of marks on fixed-wing aircraft. (a) The operator of a fixed-wing aircraft must display the... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Location of marks on fixed-wing aircraft...

  10. 14 CFR 45.25 - Location of marks on fixed-wing aircraft.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION AIRCRAFT IDENTIFICATION AND REGISTRATION MARKING Nationality and Registration Marks § 45.25 Location of marks on fixed-wing aircraft. (a) The operator of a fixed-wing aircraft shall display the... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Location of marks on fixed-wing aircraft...

  11. Fixed-bed bioreactor system for the microbial solubilization of coal

    DOEpatents

    Scott, C.D.; Strandberg, G.W.

    1987-09-14

    A fixed-bed bioreactor system for the conversion of coal into microbially solubilized coal products. The fixed-bed bioreactor continuously or periodically receives coal and bio-reactants and provides for the large scale production of microbially solubilized coal products in an economical and efficient manner. An oxidation pretreatment process for rendering coal uniformly and more readily susceptible to microbial solubilization may be employed with the fixed-bed bioreactor. 1 fig., 1 tab.

  12. Limb Amputations in Fixed Dystonia: A Form of Body Integrity Identity Disorder?

    PubMed Central

    Edwards, Mark J; Alonso-Canovas, Araceli; Schrag, Arnette; Bloem, Bastiaan R; Thompson, Philip D; Bhatia, Kailash

    2011-01-01

    Fixed dystonia is a disabling disorder mainly affecting young women who develop fixed abnormal limb postures and pain after apparently minor peripheral injury. There is continued debate regarding its pathophysiology and management. We report 5 cases of fixed dystonia in patients who sought amputation of the affected limb. We place these cases in the context of previous reports of patients with healthy limbs and patients with chronic regional pain syndrome who have sought amputation. Our cases, combined with recent data regarding disorders of mental rotation in patients with fixed dystonia, as well as previous data regarding body integrity identity disorder and amputations sought by patients with chronic regional pain syndrome, raise the possibility that patients with fixed dystonia might have a deficit in body schema that predisposes them to developing fixed dystonia and drives some to seek amputation. The outcome of amputation in fixed dystonia is invariably unfavorable. © 2011 Movement Disorder Society PMID:21484872

  13. Limb amputations in fixed dystonia: a form of body integrity identity disorder?

    PubMed

    Edwards, Mark J; Alonso-Canovas, Araceli; Schrag, Arnette; Bloem, Bastiaan R; Thompson, Philip D; Bhatia, Kailash

    2011-07-01

    Fixed dystonia is a disabling disorder mainly affecting young women who develop fixed abnormal limb postures and pain after apparently minor peripheral injury. There is continued debate regarding its pathophysiology and management. We report 5 cases of fixed dystonia in patients who sought amputation of the affected limb. We place these cases in the context of previous reports of patients with healthy limbs and patients with chronic regional pain syndrome who have sought amputation. Our cases, combined with recent data regarding disorders of mental rotation in patients with fixed dystonia, as well as previous data regarding body integrity identity disorder and amputations sought by patients with chronic regional pain syndrome, raise the possibility that patients with fixed dystonia might have a deficit in body schema that predisposes them to developing fixed dystonia and drives some to seek amputation. The outcome of amputation in fixed dystonia is invariably unfavorable. Copyright © 2011 Movement Disorder Society.

  14. FixO3: Advancement towards Open Ocean Observatory Data Management Harmonisation

    NASA Astrophysics Data System (ADS)

    Behnken, Andree; Pagnani, Maureen; Huber, Robert; Lampitt, Richard

    2015-04-01

    Since 2002 there has been a sustained effort, supported as European framework projects, to harmonise both the technology and the data management of Open Ocean fixed observatories run by European nations. FixO3 started in September 2013, and for 3 more years will coordinate the convergence of data management best practice across a constellation of moorings in the Atlantic, in both hemispheres, and in the Mediterranean. To ensure the continued existence of these unique sources of oceanographic data as sustained observatories it is vital to improve access to the data collected, both in terms of methods of presentation, real-time availability, long-term archiving and quality assurance. The data management component of FixO3 improves access to marine observatory data by harmonising data management standards, formats and workflows covering the complete life cycle of data from real time data acquisition to long-term archiving. Legal and data policy aspects have been examined and discussed to identify transnational barriers to open-access to marine observatory data. As a result, a harmonised FixO3 data policy was drafted, which provides a formal basis for data exchange between FixO3 infrastructures, and also enables open access to data for the general public. FixO3 interacts with other European infrastructures such as EMODnet, SeaDataNet, PANGAEA, and especially aims to harmonise efforts with OceanSites and MyOcean. The project landing page (www.fixo3.eu) offers detailed information about every observatory as well as data visualisations and direct downloads. In addition to this, metadata for all FixO3 - relevant data are available from the searchable FixO3 metadata catalogue, which is also accessible from the project web page. This catalogue is hosted by PANGAEA and receives updates in regular intervals. The FixO3 Standards & Services registry ties in with the GEOSS Components and Services Registry (CSR) and provides additional observatory information. The data management

  15. Route Optimization for Offloading Congested Meter Fixes

    NASA Technical Reports Server (NTRS)

    Xue, Min; Zelinski, Shannon

    2016-01-01

    The Optimized Route Capability (ORC) concept proposed by the FAA facilitates traffic managers to identify and resolve arrival flight delays caused by bottlenecks formed at arrival meter fixes when there exists imbalance between arrival fixes and runways. ORC makes use of the prediction capability of existing automation tools, monitors the traffic delays based on these predictions, and searches the best reroutes upstream of the meter fixes based on the predictions and estimated arrival schedules when delays are over a predefined threshold. Initial implementation and evaluation of the ORC concept considered only reroutes available at the time arrival congestion was first predicted. This work extends previous work by introducing an additional dimension in reroute options such that ORC can find the best time to reroute and overcome the 'firstcome- first-reroute' phenomenon. To deal with the enlarged reroute solution space, a genetic algorithm was developed to solve this problem. Experiments were conducted using the same traffic scenario used in previous work, when an arrival rush was created for one of the four arrival meter fixes at George Bush Intercontinental Houston Airport. Results showed the new approach further improved delay savings. The suggested route changes from the new approach were on average 30 minutes later than those using other approaches, and fewer numbers of reroutes were required. Fewer numbers of reroutes reduce operational complexity and later reroutes help decision makers deal with uncertain situations.

  16. Variable delivery, fixed displacement pump

    DOEpatents

    Sommars, Mark F.

    2001-01-01

    A variable delivery, fixed displacement pump comprises a plurality of pistons reciprocated within corresponding cylinders in a cylinder block. The pistons are reciprocated by rotation of a fixed angle swash plate connected to the pistons. The pistons and cylinders cooperate to define a plurality of fluid compression chambers each have a delivery outlet. A vent port is provided from each fluid compression chamber to vent fluid therefrom during at least a portion of the reciprocal stroke of the piston. Each piston and cylinder combination cooperates to close the associated vent port during another portion of the reciprocal stroke so that fluid is then pumped through the associated delivery outlet. The delivery rate of the pump is varied by adjusting the axial position of the swash plate relative to the cylinder block, which varies the duration of the piston stroke during which the vent port is closed.

  17. 48 CFR 216.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 216.306 Cost-plus-fixed-fee contracts. (c) Limitations. (i) Except as provided in...

  18. Gingival Retraction Methods for Fabrication of Fixed Partial Denture: Literature Review

    PubMed Central

    S, Safari; Ma, Vossoghi Sheshkalani; Mi, Vossoghi Sheshkalani; F, Hoseini Ghavam; M, Hamedi

    2016-01-01

    Fixed dental prosthesis success requires appropriate impression taking of the prepared finish line. This is critical in either tooth supported fixed prosthesis (crown and bridge) or implant supported fixed prosthesis (solid abutment). If the prepared finish line is adjacent to the gingival sulcus, gingival retraction techniques should be used to decrease the marginal discrepancy among the restoration and the prepared abutment. Accurate marginal positioning of the restoration in the prepared finish line of the abutment is required for therapeutic, preventive and aesthetic purposes. In this article, conventional and modern methods of gingival retraction in the fixed tooth supported prosthesis and fixed implant supported prosthesis are expressed. PubMed and Google Scholar databases were searched manually for studies on gingival tissue managements prior to impression making in fixed dental prosthesis since 1975. Conclusions were extracted and summarized. Keywords were impression making, gingival retraction, cordless retraction, and implant. Gingival retraction techniques can be classified as mechanical, chemical or surgical. In this article, different gingival management techniques are discussed. PMID:28959744

  19. Replacing natural wetlands with stormwater management facilities: Biophysical and perceived social values.

    PubMed

    Rooney, R C; Foote, L; Krogman, N; Pattison, J K; Wilson, M J; Bayley, S E

    2015-04-15

    Urban expansion replaces wetlands of natural origin with artificial stormwater management facilities. The literature suggests that efforts to mimic natural wetlands in the design of stormwater facilities can expand the provision of ecosystem services. Policy developments seek to capitalize on these improvements, encouraging developers to build stormwater wetlands in place of stormwater ponds; however, few have compared the biophysical values and social perceptions of these created wetlands to those of the natural wetlands they are replacing. We compared four types of wetlands: natural references sites, natural wetlands impacted by agriculture, created stormwater wetlands, and created stormwater ponds. We anticipated that they would exhibit a gradient in biodiversity, ecological integrity, chemical and hydrologic stress. We further anticipated that perceived values would mirror measured biophysical values. We found higher biophysical values associated with wetlands of natural origin (both reference and agriculturally impacted). The biophysical values of stormwater wetlands and stormwater ponds were lower and indistinguishable from one another. The perceived wetland values assessed by the public differed from the observed biophysical values. This has important policy implications, as the public are not likely to perceive the loss of values associated with the replacement of natural wetlands with created stormwater management facilities. We conclude that 1) agriculturally impacted wetlands provide biophysical values equivalent to those of natural wetlands, meaning that land use alone is not a great predictor of wetland value; 2) stormwater wetlands are not a substantive improvement over stormwater ponds, relative to wetlands of natural origin; 3) stormwater wetlands are poor mimics of natural wetlands, likely due to fundamental distinctions in terms of basin morphology, temporal variation in hydrology, ground water connectivity, and landscape position; 4) these

  20. Renaissance of the ~1 TeV Fixed-Target Program

    NASA Astrophysics Data System (ADS)

    Adams, T.; Appel, J. A.; Arms, K. E.; Balantekin, A. B.; Conrad, J. M.; Cooper, P. S.; Djurcic, Z.; Dunwoodie, W.; Engelfried, J.; Fisher, P. H.; Gottschalk, E.; de Gouvea, A.; Heller, K.; Ignarra, C. M.; Karagiorgi, G.; Kwan, S.; Loinaz, W. A.; Meadows, B.; Moore, R.; Morfín, J. G.; Naples, D.; Nienaber, P.; Pate, S. F.; Papavassiliou, V.; Petrov, A. A.; Purohit, M. V.; Ray, H.; Russ, J.; Schwartz, A. J.; Seligman, W. G.; Shaevitz, M. H.; Schellman, H.; Spitz, J.; Syphers, M. J.; Tait, T. M. P.; Vannucci, F.

    This document describes the physics potential of a new fixed-target program based on a ~1 TeV proton source. Two proton sources are potentially available in the future: the existing Tevatron at Fermilab, which can provide 800 GeV protons for fixed-target physics, and a possible upgrade to the SPS at CERN, called SPS+, which would produce 1 TeV protons on target. In this paper we use an example Tevatron fixed-target program to illustrate the high discovery potential possible in the charm and neutrino sectors. We highlight examples which are either unique to the program or difficult to accomplish at other venues.

  1. Renaissance of the ~ 1-TeV Fixed-Target Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, T.; /Florida State U.; Appel, J.A.

    2011-12-02

    This document describes the physics potential of a new fixed-target program based on a {approx}1 TeV proton source. Two proton sources are potentially available in the future: the existing Tevatron at Fermilab, which can provide 800 GeV protons for fixed-target physics, and a possible upgrade to the SPS at CERN, called SPS+, which would produce 1 TeV protons on target. In this paper we use an example Tevatron fixed-target program to illustrate the high discovery potential possible in the charm and neutrino sectors. We highlight examples which are either unique to the program or difficult to accomplish at other venues.

  2. Medicaid Bed-Hold Policy and Medicare Skilled Nursing Facility Rehospitalizations

    PubMed Central

    Grabowski, David C; Feng, Zhanlian; Intrator, Orna; Mor, Vincent

    2010-01-01

    Objective To analyze the effect of states' Medicaid bed-hold policies on the 30-day rehospitalization of Medicare postacute skilled nursing facility (SNF) residents. Data Sources Minimum data set assessments were merged with Medicare claims and eligibility files for all first-time SNF admissions (N = 3,322,088) over the period 2000 through 2005; states' Medicaid bed-hold policies were obtained via survey. Study Design Regression specification incorporating facility fixed effects to examine changes in Medicaid bed-hold policies on the likelihood of a 30-day SNF rehospitalization. Principal Findings Using a continuous measure of bed-hold generosity, state Medicaid bed-hold was positively related to Medicare SNF rehospitalization. Specifically, the introduction of a bed-hold policy with average generosity increases Medicare rehospitalizations by 1.8 percent, representing roughly 12,000 SNF rehospitalizations at a cost to Medicare of approximately U.S.$100 million over our study period. Conclusions Although facilities do not receive a Medicaid bed-hold payment for Medicare SNF stays, we found that the adoption of more generous policies led to greater SNF rehospitalizations. This type of spillover is largely ignored in current discussions of Medicare payment reforms such as bundled payment. Neither Medicare nor Medicaid has an incentive to internalize the risks and benefits of its actions as they affect the other. PMID:20403059

  3. Anderson Acceleration for Fixed-Point Iterations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Homer F.

    The purpose of this grant was to support research on acceleration methods for fixed-point iterations, with applications to computational frameworks and simulation problems that are of interest to DOE.

  4. Global Positioning System Antenna Fixed Height Tripod Adapter

    NASA Technical Reports Server (NTRS)

    Dinardo, Steven J.; Smith, Mark A.

    1997-01-01

    An improved Global Positioning em antenna adaptor allows fixed antenna height measurements by removably attaching an adaptor plate to a conventional surveyor's tripod. Antenna height is controlled by an antenna boom which is a fixed length rod. The antenna is attached to one end of the boom. The opposite end of the boom tapers to a point sized to fit into a depression at the center of survey markers. The boom passes through the hollow center of a universal ball joint which is mounted at the center of the adaptor plate so that the point of the rod can be fixed in the marker's central depression. The mountains of the ball joint allow the joint to be moved horizontally in any direction relative to the tripod. When the ball joint is moved horizontally, the angle between the boom and the vertical changes because the boom's position is fixed at its lower end. A spirit level attached to the rod allows an operator to determine when the boom is plumb. The position of the ball joint is adjusted horizontally until the boom is plumb. At that time the antenna is positioned exactly over the center of the monument and the elevation of the antenna is precisely set by the length of the boom.

  5. Constrained fixed-fulcrum reverse shoulder arthroplasty improves functional outcome in epileptic patients with recurrent shoulder instability

    PubMed Central

    Thangarajah, Tanujan; Higgs, Deborah; Bayley, J I L; Lambert, Simon M

    2016-01-01

    AIM: To report the results of fixed-fulcrum fully constrained reverse shoulder arthroplasty for the treatment of recurrent shoulder instability in patients with epilepsy. METHODS: A retrospective review was conducted at a single facility. Cases were identified using a computerized database and all clinic notes and operative reports were reviewed. All patients with epilepsy and recurrent shoulder instability were included for study. Between July 2003 and August 2011 five shoulders in five consecutive patients with epilepsy underwent fixed-fulcrum fully constrained reverse shoulder arthroplasty for recurrent anterior shoulder instability. The mean duration of epilepsy in the cohort was 21 years (range, 5-51) and all patients suffered from grand mal seizures. RESULTS: Mean age at the time of surgery was 47 years (range, 32-64). The cohort consisted of four males and one female. Mean follow-up was 4.7 years (range, 4.3-5 years). There were no further episodes of instability, and no further stabilisation or revision procedures were performed. The mean Oxford shoulder instability score improved from 8 preoperatively (range, 5-15) to 30 postoperatively (range, 16-37) (P = 0.015) and the mean subjective shoulder value improved from 20 (range, 0-50) preoperatively to 60 (range, 50-70) postoperatively (P = 0.016). Mean active forward elevation improved from 71° preoperatively (range, 45°-130°) to 100° postoperatively (range, 80°-90°) and mean active external rotation improved from 15° preoperatively (range, 0°-30°) to 40° (20°-70°) postoperatively. No cases of scapular notching or loosening were noted. CONCLUSION: Fixed-fulcrum fully constrained reverse shoulder arthroplasty should be considered for the treatment of recurrent shoulder instability in patients with epilepsy. PMID:27458554

  6. 48 CFR 916.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-plus-fixed-fee... METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.306 Cost-plus-fixed-fee... application of the statutory price or fee limitations. [49 FR 11955, Mar. 28, 1984, as amended at 59 FR 9105...

  7. 12 CFR 701.36 - FCU ownership of fixed assets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of fixed assets only if the aggregate all of such future investments in fixed assets does not exceed... this section when acquiring unimproved land for future expansion pursuant to the terms of section 742.4... assets if the investment would cause the aggregate of all such investments to exceed five percent of the...

  8. 46 CFR 95.05-10 - Fixed fire extinguishing systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in special cases: (1) A fixed foam system may be used in cargo tanks. (2) A water sprinkling system.... Alternately, the Commandant may permit the installation of an approved water sprinkler system or other... is contracted for on or after November 19, 1952, a fixed carbon dioxide, foam, or water spray system...

  9. 46 CFR 95.05-10 - Fixed fire extinguishing systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in special cases: (1) A fixed foam system may be used in cargo tanks. (2) A water sprinkling system.... Alternately, the Commandant may permit the installation of an approved water sprinkler system or other... is contracted for on or after November 19, 1952, a fixed carbon dioxide, foam, or water spray system...

  10. 46 CFR 95.05-10 - Fixed fire extinguishing systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in special cases: (1) A fixed foam system may be used in cargo tanks. (2) A water sprinkling system.... Alternately, the Commandant may permit the installation of an approved water sprinkler system or other... is contracted for on or after November 19, 1952, a fixed carbon dioxide, foam, or water spray system...

  11. 46 CFR 95.05-10 - Fixed fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in special cases: (1) A fixed foam system may be used in cargo tanks. (2) A water sprinkling system.... Alternately, the Commandant may permit the installation of an approved water sprinkler system or other... is contracted for on or after November 19, 1952, a fixed carbon dioxide, foam, or water spray system...

  12. Beauty and charm production at fixed-target experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erik E. Gottschalk

    Fixed-target experiments continue to provide insights into the physics of particle production in strong interactions. The experiments are performed with different types of beam particles of varying energies, and many different target materials. Studies of beauty and charm production are of particular interest, since experimental results can be compared to perturbative QCD calculations. It is in this context that recent results from fixed-target experiments on beauty and charm production will be reviewed.

  13. A fixed energy fixed angle inverse scattering in interior transmission problem

    NASA Astrophysics Data System (ADS)

    Chen, Lung-Hui

    2017-06-01

    We study the inverse acoustic scattering problem in mathematical physics. The problem is to recover the index of refraction in an inhomogeneous medium by measuring the scattered wave fields in the far field. We transform the problem to the interior transmission problem in the study of the Helmholtz equation. We find an inverse uniqueness on the scatterer with a knowledge of a fixed interior transmission eigenvalue. By examining the solution in a series of spherical harmonics in the far field, we can determine uniquely the perturbation source for the radially symmetric perturbations.

  14. Reliable Facility Location Problem with Facility Protection

    PubMed Central

    Tang, Luohao; Zhu, Cheng; Lin, Zaili; Shi, Jianmai; Zhang, Weiming

    2016-01-01

    This paper studies a reliable facility location problem with facility protection that aims to hedge against random facility disruptions by both strategically protecting some facilities and using backup facilities for the demands. An Integer Programming model is proposed for this problem, in which the failure probabilities of facilities are site-specific. A solution approach combining Lagrangian Relaxation and local search is proposed and is demonstrated to be both effective and efficient based on computational experiments on random numerical examples with 49, 88, 150 and 263 nodes in the network. A real case study for a 100-city network in Hunan province, China, is presented, based on which the properties of the model are discussed and some managerial insights are analyzed. PMID:27583542

  15. 12 CFR 701.36 - FCU ownership of fixed assets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of fixed assets only if the aggregate all of such future investments in fixed assets does not exceed... section when acquiring unimproved land for future expansion pursuant to the terms of section 742.4(a)(3... assets if the investment would cause the aggregate of all such investments to exceed five percent of the...

  16. 12 CFR 701.36 - FCU ownership of fixed assets.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of fixed assets only if the aggregate all of such future investments in fixed assets does not exceed... section when acquiring unimproved land for future expansion pursuant to the terms of section 742.4(a)(3... assets if the investment would cause the aggregate of all such investments to exceed five percent of the...

  17. 12 CFR 701.36 - FCU ownership of fixed assets.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of fixed assets only if the aggregate all of such future investments in fixed assets does not exceed... assets if the investment would cause the aggregate of all such investments to exceed five percent of the...) of this section. (i) A Federal credit union desiring a waiver must submit a written request to the...

  18. Illumination discrimination in the absence of a fixed surface-reflectance layout

    PubMed Central

    Radonjić, Ana; Ding, Xiaomao; Krieger, Avery; Aston, Stacey; Hurlbert, Anya C.; Brainard, David H.

    2018-01-01

    Previous studies have shown that humans can discriminate spectral changes in illumination and that this sensitivity depends both on the chromatic direction of the illumination change and on the ensemble of surfaces in the scene. These studies, however, always used stimulus scenes with a fixed surface-reflectance layout. Here we compared illumination discrimination for scenes in which the surface reflectance layout remains fixed (fixed-surfaces condition) to those in which surface reflectances were shuffled randomly across scenes, but with the mean scene reflectance held approximately constant (shuffled-surfaces condition). Illumination discrimination thresholds in the fixed-surfaces condition were commensurate with previous reports. Thresholds in the shuffled-surfaces condition, however, were considerably elevated. Nonetheless, performance in the shuffled-surfaces condition exceeded that attainable through random guessing. Analysis of eye fixations revealed that in the fixed-surfaces condition, low illumination discrimination thresholds (across observers) were predicted by low overall fixation spread and high consistency of fixation location and fixated surface reflectances across trial intervals. Performance in the shuffled-surfaces condition was not systematically related to any of the eye-fixation characteristics we examined for that condition, but was correlated with performance in the fixed-surfaces condition. PMID:29904786

  19. A BRST gauge-fixing procedure for Yang Mills theory on sphere

    NASA Astrophysics Data System (ADS)

    Banerjee, Rabin; Deguchi, Shinichi

    2006-01-01

    A gauge-fixing procedure for the Yang-Mills theory on an n-dimensional sphere (or a hypersphere) is discussed in a systematic manner. We claim that Adler's gauge-fixing condition used in massless Euclidean QED on a hypersphere is not conventional because of the presence of an extra free index, and hence is unfavorable for the gauge-fixing procedure based on the BRST invariance principle (or simply BRST gauge-fixing procedure). Choosing a suitable gauge condition, which is proved to be equivalent to a generalization of Adler's condition, we apply the BRST gauge-fixing procedure to the Yang-Mills theory on a hypersphere to obtain consistent results. Field equations for the Yang-Mills field and associated fields are derived in manifestly O (n + 1) covariant or invariant forms. In the large radius limit, these equations reproduce the corresponding field equations defined on the n-dimensional flat space.

  20. Fracture Surface Analysis of Clinically Failed Fixed Partial Dentures

    PubMed Central

    Taskonak, B.; Mecholsky, J.J.; Anusavice, K.J.

    2008-01-01

    Ceramic systems have limited long-term fracture resistance, especially when they are used in posterior areas or for fixed partial dentures. The objective of this study was to determine the site of crack initiation and the causes of fracture of clinically failed ceramic fixed partial dentures. Six Empress 2® lithia-disilicate (Li2O·2SiO2)-based veneered bridges and 7 experimental lithia-disilicate-based non-veneered ceramic bridges were retrieved and analyzed. Fractography and fracture mechanics methods were used to estimate the stresses at failure in 6 bridges (50%) whose fracture initiated from the occlusal surface of the connectors. Fracture of 1 non-veneered bridge (8%) initiated within the gingival surface of the connector. Three veneered bridges fractured within the veneer layers. Failure stresses of the all-core fixed partial dentures ranged from 107 to 161 MPa. Failure stresses of the veneered fixed partial dentures ranged from 19 to 68 MPa. We conclude that fracture initiation sites are controlled primarily by contact damage. PMID:16498078

  1. Long-Term Stability of WC-C Peritectic Fixed Point

    NASA Astrophysics Data System (ADS)

    Khlevnoy, B. B.; Grigoryeva, I. A.

    2015-03-01

    The tungsten carbide-carbon peritectic (WC-C) melting transition is an attractive high-temperature fixed point with a temperature of . Earlier investigations showed high repeatability, small melting range, low sensitivity to impurities, and robustness of WC-C that makes it a prospective candidate for the highest fixed point of the temperature scale. This paper presents further study of the fixed point, namely the investigation of the long-term stability of the WC-C melting temperature. For this purpose, a new WC-C cell of the blackbody type was built using tungsten powder of 99.999 % purity. The stability of the cell was investigated during the cell aging for 50 h at the cell working temperature that tooks 140 melting/freezing cycles. The method of investigation was based on the comparison of the WC-C tested cell with a reference Re-C fixed-point cell that reduces an influence of the probable instability of a radiation thermometer. It was shown that after the aging period, the deviation of the WC-C cell melting temperature was with an uncertainty of.

  2. Kinesthetic perceptions of earth- and body-fixed axes.

    PubMed

    Darling, W G; Hondzinski, J M

    1999-06-01

    The major purpose of this research was to determine whether kinesthetic/proprioceptive perceptions of the earth-fixed vertical axis are more accurate than perceptions of intrinsic axes. In one experiment, accuracy of alignment of the forearm to earth-fixed vertical and head- and trunk-longitudinal axes by seven blindfolded subjects was compared in four tasks: (1) Earth-Arm--arm (humerus) orientation was manipulated by the experimenter; subjects aligned the forearm parallel to the vertical axis, which was also aligned with the head and trunk longitudinal axis; (2) Head--head, trunk, and upper-limb orientations were manipulated by the experimenter, subjects aligned the forearm parallel to the longitudinal axis of the head using only elbow flexion/extension and shoulder internal/external rotation; (3) Trunk--same as (2), except that subjects aligned the forearm parallel to the trunk-longitudinal axis; (4) Earth--same as (2), except that subjects aligned the forearm parallel to the earth-fixed vertical. Head, trunk, and gravitational axes were never parallel in tasks 2, 3, and 4 so that subjects could not simultaneously match their forearm to all three axes. The results showed that the errors for alignment of the forearm with the earth-fixed vertical were lower than for the trunk- and head-longitudinal axes. Furthermore, errors in the Earth condition were less dependent on alterations of the head and trunk orientation than in the Head and Trunk conditions. These data strongly suggest that the earth-fixed vertical is used as one axis for the kinesthetic sensory coordinate system that specifies upper-limb orientation at the perceptual level. We also examined the effects of varying gravitational torques at the elbow and shoulder on the accuracy of forearm alignment to earth-fixed axes. Adding a 450 g load to the forearm to increase gravitational torques when the forearm is not vertical did not improve the accuracy of forearm alignment with the vertical. Furthermore

  3. Airborne and Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-421 Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) As of FY 2017...Information Program Name Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) DoD Component Army Responsible Office References SAR...UNCLASSIFIED 5 Mission and Description Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) products are software programmable

  4. Securing Volunteers to Fix up the School. Research Brief

    ERIC Educational Resources Information Center

    Johnston, Howard

    2011-01-01

    How can schools secure volunteers to help fix up the building and grounds? There isn't much research on how to secure volunteers to participate in school clean-ups and fix-ups, but some key ideas can be found in anecdotal examples from many communities around the nation. The first recommendation is that securing volunteers is easier when the…

  5. Asset Prices and Trading Volume under Fixed Transactions Costs.

    ERIC Educational Resources Information Center

    Lo, Andrew W.; Mamaysky, Harry; Wang, Jiang

    2004-01-01

    We propose a dynamic equilibrium model of asset prices and trading volume when agents face fixed transactions costs. We show that even small fixed costs can give rise to large "no-trade" regions for each agent's optimal trading policy. The inability to trade more frequently reduces the agents' asset demand and in equilibrium gives rise to a…

  6. Aircraft Pitch Control With Fixed Order LQ Compensators

    NASA Technical Reports Server (NTRS)

    Green, James; Ashokkumar, C. R.; Homaifar, Abdollah

    1997-01-01

    This paper considers a given set of fixed order compensators for aircraft pitch control problem. By augmenting compensator variables to the original state equations of the aircraft, a new dynamic model is considered to seek a LQ controller. While the fixed order compensators can achieve a set of desired poles in a specified region, LQ formulation provides the inherent robustness properties. The time response for ride quality is significantly improved with a set of dynamic compensators.

  7. Aircraft Pitch Control with Fixed Order LQ Compensators

    NASA Technical Reports Server (NTRS)

    Green, James; Ashokkumar, Cr.; Homaifar, A.

    1997-01-01

    This paper considers a given set of fixed order compensators for aircraft pitch control problem. By augmenting compensator variables to the original state equations of the aircraft, a new dynamic model is considered to seek a LQ controller. While the fixed order compensators can achieve a set of desired poles in a specified region, LQ formulation provides the inherent robustness properties. The time response for ride quality is significantly improved with a set of dynamic compensators.

  8. Fixed Point Learning Based Intelligent Traffic Control System

    NASA Astrophysics Data System (ADS)

    Zongyao, Wang; Cong, Sui; Cheng, Shao

    2017-10-01

    Fixed point learning has become an important tool to analyse large scale distributed system such as urban traffic network. This paper presents a fixed point learning based intelligence traffic network control system. The system applies convergence property of fixed point theorem to optimize the traffic flow density. The intelligence traffic control system achieves maximum road resources usage by averaging traffic flow density among the traffic network. The intelligence traffic network control system is built based on decentralized structure and intelligence cooperation. No central control is needed to manage the system. The proposed system is simple, effective and feasible for practical use. The performance of the system is tested via theoretical proof and simulations. The results demonstrate that the system can effectively solve the traffic congestion problem and increase the vehicles average speed. It also proves that the system is flexible, reliable and feasible for practical use.

  9. Moderator Demonstration Facility Design and Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McClanahan, Tucker C.; Gallmeier, Franz X.; Iverson, Erik B.

    2017-02-01

    The Spallation Neutron Source (SNS) facility at Oak Ridge National Laboratory (ORNL) is implementing a Moderator Demonstration Facility (MDF) to demonstrate the performance characteristics of advanced moderators central to the Second Target Station (STS) for SNS. The MDF will use the "spare" front-end installation within the SNS accelerator support complex – an ion source, radio-frequency quadrupole (RFQ) accelerator, and medium-energy beam transport (MEBT) chopper - to provide a 2.5 MeV proton beam of peak current 50 mA and maximum pulse length of less than 10 s at a repetition rate of no more than 60 Hz to a suitable neutron-producingmore » target to demonstrate those aspects of moderator performance necessary to meet the goals of the STS design e ort. The accelerator beam parameters are not open to variation beyond that described above - they are fixed by the nature of the spare front-end installation (the Integrated Test Stand Facility; ITSF). Accordingly, there are some neutronic challenges in developing prototypic moderator illumination from a very non-prototypic primary neutron source; the spallation source we are attempting to mimic has an extended neutron source volume approximately 40 cm long (in the direction of the proton beam), approximately 10 cm wide (horizontally transverse to the proton beam) and approximately 5 cm high (vertically transverse to the proton beam), and an isotropic evaporation energy spectrum with mean energy above 1 MeV. In contrast, the primary neutron source available from the 7Li(p,n) reaction (the most prolific at 2.5 MeV proton energy by more than an order of magnitude) is strongly anisotropic, with an energy spectrum that is both strongly dependent on emission angle and kinematically limited to less than 700 keV, and the interaction zone between the incident protons and any target material (neutron-producing or not) is intrinsically limited to a few tens of microns. The MDF will be unique and innovative amongst the world

  10. 48 CFR 52.246-7 - Inspection of Research and Development-Fixed-Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development-Fixed-Price. 52.246-7 Section 52.246-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.246-7 Inspection of Research and Development—Fixed-Price. As prescribed in 46.307(a), insert the following clause: Inspection of Research and Development—Fixed-Price (AUG 1996) (a) The Contractor...

  11. Video change detection for fixed wing UAVs

    NASA Astrophysics Data System (ADS)

    Bartelsen, Jan; Müller, Thomas; Ring, Jochen; Mück, Klaus; Brüstle, Stefan; Erdnüß, Bastian; Lutz, Bastian; Herbst, Theresa

    2017-10-01

    In this paper we proceed the work of Bartelsen et al.1 We present the draft of a process chain for an image based change detection which is designed for videos acquired by fixed wing unmanned aerial vehicles (UAVs). From our point of view, automatic video change detection for aerial images can be useful to recognize functional activities which are typically caused by the deployment of improvised explosive devices (IEDs), e.g. excavations, skid marks, footprints, left-behind tooling equipment, and marker stones. Furthermore, in case of natural disasters, like flooding, imminent danger can be recognized quickly. Due to the necessary flight range, we concentrate on fixed wing UAVs. Automatic change detection can be reduced to a comparatively simple photogrammetric problem when the perspective change between the "before" and "after" image sets is kept as small as possible. Therefore, the aerial image acquisition demands a mission planning with a clear purpose including flight path and sensor configuration. While the latter can be enabled simply by a fixed and meaningful adjustment of the camera, ensuring a small perspective change for "before" and "after" videos acquired by fixed wing UAVs is a challenging problem. Concerning this matter, we have performed tests with an advanced commercial off the shelf (COTS) system which comprises a differential GPS and autopilot system estimating the repetition accuracy of its trajectory. Although several similar approaches have been presented,23 as far as we are able to judge, the limits for this important issue are not estimated so far. Furthermore, we design a process chain to enable the practical utilization of video change detection. It consists of a front-end of a database to handle large amounts of video data, an image processing and change detection implementation, and the visualization of the results. We apply our process chain on the real video data acquired by the advanced COTS fixed wing UAV and synthetic data. For the

  12. Zirconia in fixed prosthesis. A literature review

    PubMed Central

    Román-Rodríguez, Juan L.; Ferreiroa, Alberto; Solá-Ruíz, María F.; Fons-Font, Antonio

    2014-01-01

    Statement of problem: Evidence is limited on the efficacy of zirconia-based fixed dental prostheses. Objective: To carry out a literature review of the behavior of zirconium oxide dental restorations. Material and Methods: This literature review searched the Pubmed, Scopus, Medline and Cochrane Library databases using key search words “zirconium oxide,” “zirconia,” “non-metal restorations,” “ceramic oxides,” “veneering ceramic,” “zirconia-based fixed dental prostheses”. Both in vivo and in vitro studies into zirconia-based prosthodontic restoration behavior were included. Results: Clinical studies have revealed a high rate of fracture for porcelain-veneered zirconia-based restorations that varies between 6% and 15% over a 3- to 5-year period, while for ceramo-metallic restorations the fracture rate ranges between 4 and 10% over ten years. These results provoke uncertainty as to the long-term prognosis for this material in the oral medium. The cause of veneering porcelain fractures is unknown but hypothetically they could be associated with bond failure between the veneer material and the zirconia sub-structure. Key words:Veneering ceramic, zirconia-based ceramic restoration, crown, zirconia, tooth-supported fixed prosthesis. PMID:24596638

  13. 48 CFR 952.245-2 - Government property (fixed-price contracts).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government property (fixed....245-2 Government property (fixed-price contracts). Modify FAR 52.245-2 by adding “and the DOE... paragraphs (e)(1) and (e)(2) of the clause. ...

  14. 48 CFR 952.245-2 - Government property (fixed-price contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Government property (fixed....245-2 Government property (fixed-price contracts). Modify FAR 52.245-2 by adding “and the DOE... paragraphs (e)(1) and (e)(2) of the clause. ...

  15. Beauty and charm production in fixed target experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kidonakis, Nikolaos; Vogt, Ramona

    We present calculations of NNLO threshold corrections for beauty and charm production in {pi}{sup -} p and pp interactions at fixed-target experiments. Recent calculations for heavy quark hadroproduction have included next-to-next-to-leading-order (NNLO) soft-gluon corrections [1] to the double differential cross section from threshold resummation techniques [2]. These corrections are important for near-threshold beauty and charm production at fixed-target experiments, including HERA-B and some of the current and future heavy ion experiments.

  16. Engineering Support of Microgravity Life Science Research: Development of an Avian Development Facility

    NASA Technical Reports Server (NTRS)

    Vellinger, J.; Deuser, M.; Hullinger, R.

    1995-01-01

    The Avian Development Facility (ADF) is designed to provide a 'window' for the study of embryogenesis in space. It allows researchers to determine and then to mitigate or nullify the forces of altered gravity upon embryos when leaving and re-entering the Earth's gravity. The ADF design will allow investigations to begin their incubation after their experiments have achieved orbit, and shut down the experiment and fix specimens before leaving orbit. In effect, the ADF makes every attempt to minimize launch and re-entry effects in order to isolate and preserve the effects of the experimental variable(s) of the space environment.

  17. Fluorine-fixing efficiency on calcium-based briquette: pilot experiment, demonstration and promotion.

    PubMed

    Yang, Jiao-lan; Chen, Dong-qing; Li, Shu-min; Yue, Yin-ling; Jin, Xin; Zhao, Bing-cheng; Ying, Bo

    2010-02-05

    The fluorosis derived from coal burning is a very serious problem in China. By using fluorine-fixing technology during coal burning we are able to reduce the release of fluorides in coal at the source in order to reduce pollution to the surrounding environment by coal burning pollutants as well as decrease the intake and accumulating amounts of fluorine in the human body. The aim of this study was to conduct a pilot experiment on calcium-based fluorine-fixing material efficiency during coal burning to demonstrate and promote the technology based on laboratory research. A proper amount of calcium-based fluorine sorbent was added into high-fluorine coal to form briquettes so that the fluorine in high-fluorine coal can be fixed in coal slag and its release into atmosphere reduced. We determined figures on various components in briquettes and fluorine in coal slag as well as the concentrations of indoor air pollutants, including fluoride, sulfur dioxide and respirable particulate matter (RPM), and evaluated the fluorine-fixing efficiency of calcium-based fluorine sorbents and the levels of indoor air pollutants. Pilot experiments on fluorine-fixing efficiency during coal burning as well as its demonstration and promotion were carried out separately in Guiding and Longli Counties of Guizhou Province, two areas with coal burning fluorosis problems. If the calcium-based fluorine sorbent mixed coal was made into honeycomb briquettes the average fluorine-fixing ratio in the pilot experiment was 71.8%. If the burning calcium-based fluorine-fixing bitumite was made into a coalball, the average of fluorine-fixing ratio was 77.3%. The concentration of fluoride, sulfur dioxide and PM10 of indoor air were decreased significantly. There was a 10% increase in the cost of briquettes due to the addition of calcium-based fluorine sorbent. The preparation process of calcium-based fluorine-fixing briquette is simple yet highly flammable and it is applicable to regions with abundant

  18. Fixed or adapted conditioning intensity for repeated conditioned pain modulation.

    PubMed

    Hoegh, M; Petersen, K K; Graven-Nielsen, T

    2017-12-29

    Aims Conditioned pain modulation (CPM) is used to assess descending pain modulation through a test stimulation (TS) and a conditioning stimulation (CS). Due to potential carry-over effects, sequential CPM paradigms might alter the intensity of the CS, which potentially can alter the CPM-effect. This study aimed to investigate the difference between a fixed and adaptive CS intensity on CPM-effect. Methods On the dominant leg of 20 healthy subjects the cuff pressure detection threshold (PDT) was recorded as TS and the pain tolerance threshold (PTT) was assessed on the non-dominant leg for estimating the CS. The difference in PDT before and during CS defined the CPM-effect. The CPM-effect was assessed four times using a CS with intensities of 70% of baseline PTT (fixed) or 70% of PTT measured throughout the session (adaptive). Pain intensity of the conditioning stimulus was assessed on a numeric rating scale (NRS). Data were analyzed with repeated-measures ANOVA. Results No difference was found comparing the four PDTs assessed before CSs for the fixed and the adaptive paradigms. The CS pressure intensity for the adaptive paradigm was increasing during the four repeated assessments (P < 0.01). The pain intensity was similar during the fixed (NRS: 5.8±0.5) and the adjusted paradigm (NRS: 6.0±0.4). The CPM-effect was higher using the fixed condition compared with the adaptive condition (P < 0.05). Conclusions The current study found that sequential CPM paradigms using a fixed conditioning stimulus produced an increased CPM-effect compared with adaptive and increasing conditioning intensities.

  19. Tracing the evolutionary path to nitrogen-fixing crops.

    PubMed

    Delaux, Pierre-Marc; Radhakrishnan, Guru; Oldroyd, Giles

    2015-08-01

    Nitrogen-fixing symbioses between plants and bacteria are restricted to a few plant lineages. The plant partner benefits from these associations by gaining access to the pool of atmospheric nitrogen. By contrast, other plant species, including all cereals, rely only on the scarce nitrogen present in the soil and what they can glean from associative bacteria. Global cereal yields from conventional agriculture are dependent on the application of massive levels of chemical fertilisers. Engineering nitrogen-fixing symbioses into cereal crops could in part mitigate the economic and ecological impacts caused by the overuse of fertilisers and provide better global parity in crop yields. Comparative phylogenetics and phylogenomics are powerful tools to identify genetic and genomic innovations behind key plant traits. In this review we highlight recent discoveries made using such approaches and we discuss how these approaches could be used to help direct the engineering of nitrogen-fixing symbioses into cereals. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. The ARM Climate Research Facility - New Capabilities and the Expected Impacts on Climate Science and Modeling

    NASA Astrophysics Data System (ADS)

    Voyles, J.; Mather, J. H.

    2010-12-01

    The ARM Climate Research Facility is a Department of Energy national scientific user facility. Research sites include fixed and mobile facilities, which collect research quality data for climate research. Through the American Recovery and Reinvestment Act of 2009, the U.S. Department of Energy’s Office of Science allocated $60 million to the ARM Climate Research Facility for the purchase of instruments and improvement of research sites. With these funds, ARM is in the process of deploying a broad variety of new instruments that will greatly enhance the measurement capabilities of the facility. New instruments being purchased include dual-frequency scanning cloud radars, scanning precipitation radars, Doppler lidars, a mobile Aerosol Observing System and many others. A list of instruments being purchased is available at http://www.arm.gov/about/recovery-act. Orders for all instruments have now been placed and activities are underway to integrate these new systems with our research sites. The overarching goal is to provide instantaneous and statistical measurements of the climate that can be used to advance the physical understanding and predictive performance of climate models. The Recovery Act investments enable the ARM Climate Research Facility to enhance existing and add new measurements, which enable a more complete understanding of the 3-dimensional evolution of cloud processes and related atmospheric properties. Understanding cloud processes are important globally, to reduce climate-modeling uncertainties and help improve our nation’s ability to manage climate impacts. Domer Plot of W-Band Reflectivity

  1. Stitching-aware in-design DPT auto fixing for sub-20nm logic devices

    NASA Astrophysics Data System (ADS)

    Choi, Soo-Han; Sai Krishna, K. V. V. S.; Pemberton-Smith, David

    2017-03-01

    As the technology continues to shrink below 20nm, Double Patterning Technology (DPT) becomes one of the mandatory solutions for routing metal layers. From the view point of Place and Route (P&R), the major concerns are how to prevent DPT odd-cycles automatically without sacrificing chip area. Even though the leading-edge P&R tools have advanced algorithms to prevent DPT odd-cycles, it is very hard to prevent the localized DPT odd-cycles, especially in Engineering Change Order (ECO) routing. In the last several years, we developed In-design DPT Auto Fixing method in order to reduce localized DPT odd-cycles significantly during ECO and could achieve remarkable design Turn-Around Times (TATs). But subsequently, as the design complexity continued increasing and chip size continued decreasing, we needed a new In-design DPT Auto Fixing approach to improve the auto. fixing rate. In this paper, we present the Stitching-Aware In-design DPT Auto Fixing method for better fixing rates and smaller chip design. The previous In-design DPT Auto Fixing method detected all DPT odd-cycles and tried to remove oddcycles by increasing the adjacent space. As the metal congestions increase in the newer technology nodes, the older Auto Fixing method has limitations to increase the adjacent space between routing metals. Consequently, the auto fixing rate of older method gets worse with the introduction of the smaller design rules. With DPT stitching enablement at In-design DRC checking procedure, the new Stitching-Aware DPT Auto Fixing method detects the most critical odd-cycles and revolve the odd-cycles automatically. The accuracy of new flow ensures better usage of space in the congested areas, and helps design more smaller chips. By applying the Stitching-Aware DPT Auto Fixing method to sub-20nm logic devices, we can confirm that the auto fixing rate is improved by 2X compared with auto fixing without stitching. Additionally, by developing the better heuristic algorithm and flow for DPT

  2. Meshless method for solving fixed boundary problem of plasma equilibrium

    NASA Astrophysics Data System (ADS)

    Imazawa, Ryota; Kawano, Yasunori; Itami, Kiyoshi

    2015-07-01

    This study solves the Grad-Shafranov equation with a fixed plasma boundary by utilizing a meshless method for the first time. Previous studies have utilized a finite element method (FEM) to solve an equilibrium inside the fixed separatrix. In order to avoid difficulties of FEM (such as mesh problem, difficulty of coding, expensive calculation cost), this study focuses on the meshless methods, especially RBF-MFS and KANSA's method to solve the fixed boundary problem. The results showed that CPU time of the meshless methods was ten to one hundred times shorter than that of FEM to obtain the same accuracy.

  3. [Characteristics of porcine thoracic arteries fixed with polyepoxy compound].

    PubMed

    Yu, Xi-Xun; Chen, Huai-Qing

    2005-09-01

    To investigate the characteristics of porcine thoracic arteries fixed with ethylene glycol diglycidyl ether (EX-810) and to provide the proper scaffold materials for tissue-engineered blood vessel. The porcine thoracic arteries were respectively treated with 40 ml/L EX-810 and 6.25 g/L glutaraldehyde, and then they were examined with naked-eye, light microscope and scanning electron microscope. The fixation index determination, the amino acid analysis and the biomechanics test were also performed. The antigenicity of vascular tissues can be diminished by EX-810 through getting rid of cell in the vascular tissues or reducing the level of free amino groups in the vascular tissues. The structural integrity of vascular tissues can be preserved after treatment with EX-810. It was also found that the EX-810-fixed porcine vascular tissues appeared more similar to the natural vascular tissues in color and mechanical properties, and were more pliable than the glutaraldehyde-fixed tissues. The EX-810-fixed porcine thoracic arteries with low cytotoxicity and low antigenicity showed favorable characteristic similar to those of natural vessel, and it should be a promising material for fabricating scaffold of tissue-engineered blood vessel.

  4. Renormalization group fixed points of foliated gravity-matter systems

    NASA Astrophysics Data System (ADS)

    Biemans, Jorn; Platania, Alessia; Saueressig, Frank

    2017-05-01

    We employ the Arnowitt-Deser-Misner formalism to study the renormalization group flow of gravity minimally coupled to an arbitrary number of scalar, vector, and Dirac fields. The decomposition of the gravitational degrees of freedom into a lapse function, shift vector, and spatial metric equips spacetime with a preferred (Euclidean) "time"- direction. In this work, we provide a detailed derivation of the renormalization group flow of Newton's constant and the cosmological constant on a flat Friedmann-Robertson-Walker background. Adding matter fields, it is shown that their contribution to the flow is the same as in the covariant formulation and can be captured by two parameters d g d λ . We classify the resulting fixed point structure as a function of these parameters finding that the existence of non-Gaussian renormalization group fixed points is rather generic. In particular the matter content of the standard model and its most common extensions gives rise to one non-Gaussian fixed point with real critical exponents suitable for Asymptotic Safety. Moreover, we find non-Gaussian fixed points for any number of scalar matter fields, making the scenario attractive for cosmological model building.

  5. RSRM nozzle fixed housing cooldown test

    NASA Technical Reports Server (NTRS)

    Bolieau, D. J.

    1989-01-01

    Flight 5 aft segments with nozzles were exposed to -17 F temperatures while awaiting shipment to KSC in February, 1989. No records were found which show that any previous nozzles were exposed to air temperatures as low as those seen by the Flight 5 nozzles. Thermal analysis shows that the temperature of the fixed housing, and forward and aft exit cone components dropped as low as -10 F. Structural analysis of the nozzles at these low temperatures show the forward and aft exit cone adhesive bonds to have a positive margin of safety, based on a 2.0 safety factor. These analyses show the normal and shear stresses in the fixed housing bond as low values. However, the hoop and meridinal stresses were predicted to be in the 4000 psi range; the failure stress allowable of EA913NA adhesive at -7 F. If the bonds did break in directions perpendicular to the surfaces, called bond crazing, no normal bond strength would be lost. Testing was conducted in two phases, showing that no degradation to the adhesive bonds occurred while the Flight 5 nozzles were subjected to subzero temperatures. The results of these tests are documented. Phase 1 testing cooled a full-scale RSRM insulated fixed housing to -13 F, with extensive bondline inspections. Phase 2 testing cooled the witness panel adhesive tensile buttions to -13 F, with failure strengths recorded before, during, and after the cooldown.

  6. Fine-scale Horizontal Structure of Arctic Mixed-Phase Clouds.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rambukkange,M.; Verlinde, J.; Elorante, E.

    2006-07-10

    Recent in situ observations in stratiform clouds suggest that mixed phase regimes, here defined as limited cloud volumes containing both liquid and solid water, are constrained to narrow layers (order 100 m) separating all-liquid and fully glaciated volumes (Hallett and Viddaurre, 2005). The Department of Energy Atmospheric Radiation Measurement Program's (DOE-ARM, Ackerman and Stokes, 2003) North Slope of Alaska (NSA) ARM Climate Research Facility (ACRF) recently started collecting routine measurement of radar Doppler velocity power spectra from the Millimeter Cloud Radar (MMCR). Shupe et al. (2004) showed that Doppler spectra has potential to separate the contributions to the total reflectivitymore » of the liquid and solid water in the radar volume, and thus to investigate further Hallett and Viddaurre's findings. The Mixed-Phase Arctic Cloud Experiment (MPACE) was conducted along the NSA to investigate the properties of Arctic mixed phase clouds (Verlinde et al., 2006). We present surface based remote sensing data from MPACE to discuss the fine-scale structure of the mixed-phase clouds observed during this experiment.« less

  7. Improved Estimates of Moments and Winds from Radar Wind Profiler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helmus, Jonathan; Ghate, Virendra P.

    2017-01-02

    The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) operates nine radar wind profilers (RWP) across its sites. These RWPs operate at 915 MHz or 1290 MHz frequency and report the first three moments of the Doppler spectrum. The operational settings of the RWP were modified in summer, 2015 to have single pulse length setting for the wind mode and two pulse length settings for the precipitation mode. The moments data collected during the wind mode are used to retrieve horizontal winds. The vendor-reported winds are available at variable time resolution (10 mins, 60 mins,more » etc.) and contain a significant amount of contamination due to noise and clutter. In this data product we have recalculated the moments and the winds from the raw radar Doppler spectrum and have made efforts to mitigate the contamination due to instrument noise in the wind estimates. Additionally, the moments and wind data has been reported in a harmonized layout identical for all locations and sites.« less

  8. 13 CFR 120.213 - What fixed interest rates may a Lender charge?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What fixed interest rates may a... BUSINESS LOANS Policies Specific to 7(a) Loans Maturities; Interest Rates; Loan and Guarantee Amounts § 120.213 What fixed interest rates may a Lender charge? (a) Fixed Rates for Guaranteed Loans. A loan may...

  9. Fixed-Cell Imaging of Schizosaccharomyces pombe.

    PubMed

    Hagan, Iain M; Bagley, Steven

    2016-07-01

    The acknowledged genetic malleability of fission yeast has been matched by impressive cytology to drive major advances in our understanding of basic molecular cell biological processes. In many of the more recent studies, traditional approaches of fixation followed by processing to accommodate classical staining procedures have been superseded by live-cell imaging approaches that monitor the distribution of fusion proteins between a molecule of interest and a fluorescent protein. Although such live-cell imaging is uniquely informative for many questions, fixed-cell imaging remains the better option for others and is an important-sometimes critical-complement to the analysis of fluorescent fusion proteins by live-cell imaging. Here, we discuss the merits of fixed- and live-cell imaging as well as specific issues for fluorescence microscopy imaging of fission yeast. © 2016 Cold Spring Harbor Laboratory Press.

  10. 30 CFR 57.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fixed ladder anchorage and toe clearance. 57.11005 Section 57.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Travelways and Escapeways Travelways-Surface and Underground § 57.11005 Fixed ladder anchorage and...

  11. 30 CFR 57.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fixed ladder anchorage and toe clearance. 57.11005 Section 57.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Travelways and Escapeways Travelways-Surface and Underground § 57.11005 Fixed ladder anchorage and...

  12. 30 CFR 57.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fixed ladder anchorage and toe clearance. 57.11005 Section 57.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Travelways and Escapeways Travelways-Surface and Underground § 57.11005 Fixed ladder anchorage and...

  13. 30 CFR 57.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fixed ladder anchorage and toe clearance. 57.11005 Section 57.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Travelways and Escapeways Travelways-Surface and Underground § 57.11005 Fixed ladder anchorage and...

  14. 30 CFR 57.11005 - Fixed ladder anchorage and toe clearance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fixed ladder anchorage and toe clearance. 57.11005 Section 57.11005 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... MINES Travelways and Escapeways Travelways-Surface and Underground § 57.11005 Fixed ladder anchorage and...

  15. 48 CFR 52.249-7 - Termination (Fixed-Price Architect-Engineer).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Architect-Engineer). 52.249-7 Section 52.249-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.249-7 Termination (Fixed-Price Architect-Engineer). As prescribed in 49.503(b), insert the following clause in solicitations and contracts for architect-engineer services when a fixed-price contract...

  16. 48 CFR 52.249-7 - Termination (Fixed-Price Architect-Engineer).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Architect-Engineer). 52.249-7 Section 52.249-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.249-7 Termination (Fixed-Price Architect-Engineer). As prescribed in 49.503(b), insert the following clause in solicitations and contracts for architect-engineer services when a fixed-price contract...

  17. 48 CFR 52.249-7 - Termination (Fixed-Price Architect-Engineer).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Architect-Engineer). 52.249-7 Section 52.249-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.249-7 Termination (Fixed-Price Architect-Engineer). As prescribed in 49.503(b), insert the following clause in solicitations and contracts for architect-engineer services when a fixed-price contract...

  18. 48 CFR 52.249-7 - Termination (Fixed-Price Architect-Engineer).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Architect-Engineer). 52.249-7 Section 52.249-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.249-7 Termination (Fixed-Price Architect-Engineer). As prescribed in 49.503(b), insert the following clause in solicitations and contracts for architect-engineer services when a fixed-price contract...

  19. A Fixed-Wing Micro Air Vehicle with Hovering Capability

    DTIC Science & Technology

    2010-12-01

    AFRL-AFOSR-UK-TR-2010-0001 A Fixed-Wing Micro Air Vehicle with Hovering Capability Jean-Marc Moschetta SUPAERO Dept of...06 July 2010 Air Force Research Laboratory Air Force Office of Scientific Research European Office of Aerospace Research and...To) 06 July 2007 - 06 July 2010 4. TITLE AND SUBTITLE A Fixed-Wing Micro Air Vehicle with Hovering Capability 5a. CONTRACT NUMBER FA8655-07

  20. Costs of HIV/AIDS outpatient services delivered through Zambian public health facilities.

    PubMed

    Bratt, John H; Torpey, Kwasi; Kabaso, Mushota; Gondwe, Yebo

    2011-01-01

    To present evidence on unit and total costs of outpatient HIV/AIDS services in ZPCT-supported facilities in Zambia; specifically, to measure unit costs of selected outpatient HIV/AIDS services, and to estimate total annual costs of antiretroviral therapy (ART) and prevention of mother-to-child transmission (PMTCT) in Zambia. Cost data from 2008 were collected in 12 ZPCT-supported facilities (hospitals and health centres) in four provinces. Costs of all resources used to produce ART, PMTCT and CT visits were included, using the perspective of the provider. All shared costs were distributed to clinic visits using appropriate allocation variables. Estimates of annual costs of HIV/AIDS services were made using ZPCT and Ministry of Health data on numbers of persons receiving services in 2009. Unit costs of visits were driven by costs of drugs, laboratory tests and clinical labour, while variability in visit costs across facilities was explained mainly by differences in utilization. First-year costs of ART per client ranged from US$278 to US$523 depending on drug regimen and facility type; costs of a complete course of antenatal care (ANC) including PMTCT were approximately US$114. Annual costs of ART provided in ZPCT-supported facilities were estimated at US$14.7-$40.1 million depending on regimen, and annual costs of antenatal care including PMTCT were estimated at US$16 million. In Zambia as a whole, the respective estimates were US$41.0-114.2 million for ART and US$57.7 million for ANC including PMTCT. Consistent with the literature, total costs of services were dominated by drugs, laboratory tests and clinical labour. For each visit type, variability across facilities in total costs and cost components suggests that some potential exists to reduce costs through greater harmonization of care protocols and more intensive use of fixed resources. Improving facility-level information on the costs of resources used to produce services should be emphasized as an element of

  1. Effects of fixed labial orthodontic appliances on speech sound production.

    PubMed

    Paley, Jonathan S; Cisneros, George J; Nicolay, Olivier F; LeBlanc, Etoile M

    2016-05-01

    To explore the impact of fixed labial orthodontic appliances on speech sound production. Speech evaluations were performed on 23 patients with fixed labial appliances. Evaluations were performed immediately prior to appliance insertion, immediately following insertion, and 1 and 2 months post insertion. Baseline dental/skeletal variables were correlated with the ability to accommodate the presence of the appliances. Appliance effects were variable: 44% of the subjects were unaffected, 39% were temporarily affected but adapted within 2 months, and 17% of patients showed persistent sound errors at 2 months. Resolution of acquired sound errors was noted by 8 months post-appliance removal. Maladaptation to appliances was correlated to severity of malocclusion as determined by the Grainger's Treatment Priority Index. Sibilant sounds, most notably /s/, were affected most often. (1) Insertion of fixed labial appliances has an effect on speech sound production. (2) Sibilant and stopped sounds are affected, with /s/ being affected most often. (3) Accommodation to fixed appliances depends on the severity of malocclusion.

  2. Fixed Costs and Hours Constraints

    ERIC Educational Resources Information Center

    Johnson, William R.

    2011-01-01

    Hours constraints are typically identified by worker responses to questions asking whether they would prefer a job with more hours and more pay or fewer hours and less pay. Because jobs with different hours but the same rate of pay may be infeasible when there are fixed costs of employment or mandatory overtime premia, the constraint in those…

  3. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  4. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  5. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  6. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  7. 46 CFR 56.50-103 - Fixed oxygen-acetylene distribution piping.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Fixed oxygen-acetylene distribution piping. 56.50-103... oxygen-acetylene distribution piping. (a) This section applies to fixed piping installed for the distribution of oxygen and acetylene carried in cylinders as vessels stores. (b) The distribution piping shall...

  8. X-Ray Testing Constellation-X Optics at MSFC's 100-m Facility

    NASA Technical Reports Server (NTRS)

    O'Dell, Stephen; Baker, Markus; Content, David; Freeman, Mark; Glenn, Paul; Gubarev, Mikhail; Hair, Jason; Jones, William; Joy, Marshall

    2003-01-01

    In addition to the 530-m-long X-Ray Calibration Facility (XRCF), NASA's Marshall Space Flight Center (MSFC) operates a 104-m-long (source-to-detector) X-ray-test facility. Originally developed and still occasionally used for stray-light testing of visible-fight optical systems, the so-called "Stray-Light Facility" now serves primarily as a convenient and inexpensive facility for performance evaluation and calibration of X-ray optics and detectors. The facility can accommodate X-ray optics up to about 1-m diameter and 12-m focal length. Currently available electron-impact sources at the facility span the approximate energy range 0.2 to 100 keV, thus supporting testing of soft- and hard-X-ray optics and detectors. Available MSFC detectors are a front-illuminated CCD (charge-coupled device) and a scanning CZT (cadmium--zinc--telluride) detector, with low-energy cut-offs of about 0.8 and 3 keV, respectively. In order to test developmental optics for the Constellation-X Project, led by NASA's Goddard Space Flight Center (GSFC), MSFC undertook several enhancements to the facility. Foremost among these was development and fabrication of a five-degree-of-freedom (5-DoF) optics mount and control system, which translates and tilts the user-provided mirror assembly suspended from its interface plate. Initial Constellation-X tests characterize the performance of the Optical Alignment Pathfinder Two (OAP2) for the large Spectroscopy X-ray Telescope (SXT) and of demonstration mirror assemblies for the Hard X-ray Telescope (HXT). With the Centroid Detector Assembly (CDA), used for precision alignment of the Chandra (nee AXAF) mirrors, the Constellation-X SXT Team optically aligned the individual mirrors of the OAPZ at GSFC. The team then developed set-up and alignment procedures, including transfer of the alignment from the optical alignment facility at GSFC to the X-ray test facility at MSFC, using a reference flat and fiducials. The OAPZ incorporates additional ancillary

  9. Products of random matrices from fixed trace and induced Ginibre ensembles

    NASA Astrophysics Data System (ADS)

    Akemann, Gernot; Cikovic, Milan

    2018-05-01

    We investigate the microcanonical version of the complex induced Ginibre ensemble, by introducing a fixed trace constraint for its second moment. Like for the canonical Ginibre ensemble, its complex eigenvalues can be interpreted as a two-dimensional Coulomb gas, which are now subject to a constraint and a modified, collective confining potential. Despite the lack of determinantal structure in this fixed trace ensemble, we compute all its density correlation functions at finite matrix size and compare to a fixed trace ensemble of normal matrices, representing a different Coulomb gas. Our main tool of investigation is the Laplace transform, that maps back the fixed trace to the induced Ginibre ensemble. Products of random matrices have been used to study the Lyapunov and stability exponents for chaotic dynamical systems, where the latter are based on the complex eigenvalues of the product matrix. Because little is known about the universality of the eigenvalue distribution of such product matrices, we then study the product of m induced Ginibre matrices with a fixed trace constraint—which are clearly non-Gaussian—and M  ‑  m such Ginibre matrices without constraint. Using an m-fold inverse Laplace transform, we obtain a concise result for the spectral density of such a mixed product matrix at finite matrix size, for arbitrary fixed m and M. Very recently local and global universality was proven by the authors and their coworker for a more general, single elliptic fixed trace ensemble in the bulk of the spectrum. Here, we argue that the spectral density of mixed products is in the same universality class as the product of M independent induced Ginibre ensembles.

  10. Ship Air Wake Detection Using a Small Fixed Wing Unmanned Aerial Vehicle

    NASA Astrophysics Data System (ADS)

    Phelps, David M.

    A ship's air wake is dynamically detected using an airborne inertial measurement unit (IMU) and global positioning system (GPS) attached to a fixed wing unmanned aerial system. A fixed wing unmanned aerial system (UAS) was flown through the air wake created by an underway 108 ft (32.9m) long research vessel in pre designated flight paths. The instrumented aircraft was used to validate computational fluid dynamic (CFD) simulations of naval ship air wakes. Computer models of the research ship and the fixed wing UAS were generated and gridded using NASA's TetrUSS software. Simulations were run using Kestrel, a Department of Defense CFD software to validate the physical experimental data collection method. Air wake simulations were run at various relative wind angles and speeds. The fixed wing UAS was subjected to extensive wind tunnel testing to generate a table of aerodynamic coefficients as a function of control surface deflections, angle of attack and sideslip. The wind tunnel experimental data was compared against similarly structured CFD experiments to validate the grid and model of fixed wing UAS. Finally, a CFD simulation of the fixed wing UAV flying through the generated wake was completed. Forces on the instrumented aircraft were calculated from the data collected by the IMU. Comparison of experimental and simulation data showed that the fixed wing UAS could detect interactions with the ship air wake.

  11. Nonparametric estimation and testing of fixed effects panel data models

    PubMed Central

    Henderson, Daniel J.; Carroll, Raymond J.; Li, Qi

    2009-01-01

    In this paper we consider the problem of estimating nonparametric panel data models with fixed effects. We introduce an iterative nonparametric kernel estimator. We also extend the estimation method to the case of a semiparametric partially linear fixed effects model. To determine whether a parametric, semiparametric or nonparametric model is appropriate, we propose test statistics to test between the three alternatives in practice. We further propose a test statistic for testing the null hypothesis of random effects against fixed effects in a nonparametric panel data regression model. Simulations are used to examine the finite sample performance of the proposed estimators and the test statistics. PMID:19444335

  12. Segment Fixed Priority Scheduling for Self Suspending Real Time Tasks

    DTIC Science & Technology

    2016-08-11

    Segment-Fixed Priority Scheduling for Self-Suspending Real -Time Tasks Junsung Kim, Department of Electrical and Computer Engineering, Carnegie...4 2.1 Application of a Multi-Segment Self-Suspending Real -Time Task Model ............................. 5 3 Fixed Priority Scheduling...1 Figure 2: A multi-segment self-suspending real -time task model

  13. 21 CFR 300.50 - Fixed-combination prescription drugs for humans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 5 2011-04-01 2011-04-01 false Fixed-combination prescription drugs for humans. 300.50 Section 300.50 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE GENERAL Combination Drugs § 300.50 Fixed-combination prescription...

  14. 21 CFR 300.50 - Fixed-combination prescription drugs for humans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 5 2013-04-01 2013-04-01 false Fixed-combination prescription drugs for humans. 300.50 Section 300.50 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE GENERAL Combination Drugs § 300.50 Fixed-combination prescription...

  15. 21 CFR 300.50 - Fixed-combination prescription drugs for humans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Fixed-combination prescription drugs for humans. 300.50 Section 300.50 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE GENERAL Combination Drugs § 300.50 Fixed-combination prescription...

  16. 21 CFR 300.50 - Fixed-combination prescription drugs for humans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 5 2014-04-01 2014-04-01 false Fixed-combination prescription drugs for humans. 300.50 Section 300.50 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE GENERAL Combination Drugs § 300.50 Fixed-combination prescription...

  17. 21 CFR 300.50 - Fixed-combination prescription drugs for humans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 5 2012-04-01 2012-04-01 false Fixed-combination prescription drugs for humans. 300.50 Section 300.50 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE GENERAL Combination Drugs § 300.50 Fixed-combination prescription...

  18. Immunomagnetic separation can enrich fixed solid tumors for epithelial cells.

    PubMed

    Yaremko, M L; Kelemen, P R; Kutza, C; Barker, D; Westbrook, C A

    1996-01-01

    Immunomagnetic separation is a highly specific technique for the enrichment or isolation of cells from a variety of fresh tissues and microorganisms or molecules from suspensions. Because new techniques for molecular analysis of solid tumors are now applicable to fixed tissue but sometimes require or benefit from enrichment for tumor cells, we tested the efficacy of immunomagnetic separation for enriching fixed solid tumors for malignant epithelial cells. We applied it to two different tumors and fixation methods to separate neoplastic from non-neoplastic cells in primary colorectal cancers and metastatic breast cancers, and were able to enrich to a high degree of purity. Immunomagnetic separation was effective in unembedded fixed tissue as well as fixed paraffin-embedded tissue. The magnetically separated cells were amenable to fluorescence in situ hybridization and polymerase chain reaction amplification of their DNA with minimal additional manipulation. The high degree of enrichment achieved before amplification contributed to interpretation of loss of heterozygosity in metastatic breast cancers, and simplified fluorescence in situ hybridization analysis because only neoplastic cells were hybridized and counted. Immunomagnetic separation is effective for the enrichment of fixed solid tumors, can be performed with widely available commercial antibodies, and requires little specialized instrumentation. It can contribute to interpretation of results in situations where enrichment by other methods is difficult or not possible.

  19. Immunomagnetic separation can enrich fixed solid tumors for epithelial cells.

    PubMed Central

    Yaremko, M. L.; Kelemen, P. R.; Kutza, C.; Barker, D.; Westbrook, C. A.

    1996-01-01

    Immunomagnetic separation is a highly specific technique for the enrichment or isolation of cells from a variety of fresh tissues and microorganisms or molecules from suspensions. Because new techniques for molecular analysis of solid tumors are now applicable to fixed tissue but sometimes require or benefit from enrichment for tumor cells, we tested the efficacy of immunomagnetic separation for enriching fixed solid tumors for malignant epithelial cells. We applied it to two different tumors and fixation methods to separate neoplastic from non-neoplastic cells in primary colorectal cancers and metastatic breast cancers, and were able to enrich to a high degree of purity. Immunomagnetic separation was effective in unembedded fixed tissue as well as fixed paraffin-embedded tissue. The magnetically separated cells were amenable to fluorescence in situ hybridization and polymerase chain reaction amplification of their DNA with minimal additional manipulation. The high degree of enrichment achieved before amplification contributed to interpretation of loss of heterozygosity in metastatic breast cancers, and simplified fluorescence in situ hybridization analysis because only neoplastic cells were hybridized and counted. Immunomagnetic separation is effective for the enrichment of fixed solid tumors, can be performed with widely available commercial antibodies, and requires little specialized instrumentation. It can contribute to interpretation of results in situations where enrichment by other methods is difficult or not possible. Images Figure 1 Figure 2 Figure 3 PMID:8546231

  20. 29 CFR 1910.27 - Fixed ladders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Walking-Working Surfaces § 1910.27 Fixed ladders. (a) Design... fraction thereof, except that, where no cage, well, or ladder safety device is provided, landing platforms...

  1. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  2. Occupational exposures to solvents and metals are associated with fixed airflow obstruction.

    PubMed

    Alif, Sheikh M; Dharmage, Shyamali C; Benke, Geza; Dennekamp, Martine; Burgess, John A; Perret, Jennifer L; Lodge, Caroline J; Morrison, Stephen; Johns, David P; Giles, Graham G; Gurrin, Lyle C; Thomas, Paul S; Hopper, John L; Wood-Baker, Richard; Thompson, Bruce R; Feather, Iain H; Vermeulen, Roel; Kromhout, Hans; Walters, E Haydn; Abramson, Michael J; Matheson, Melanie C

    2017-11-01

    Objectives This study investigated the associations between occupational exposures to solvents and metals and fixed airflow obstruction (AO) using post-bronchodilator spirometry. Methods We included 1335 participants from the 2002-2008 follow-up of the Tasmanian Longitudinal Health Study. Ever-exposure and cumulative exposure-unit (EU) years were calculated using the ALOHA plus job exposure matrix (JEM). Fixed AO was defined as post-bronchodilator forced expiratory volume in one second (FEV1)/forced vital capacity (FVC) <0.7 and FEV 1 /FVCfixed AO plus low DLco. Multinomial regressions were used to estimate associations adjusting for possible confounders. Results Ever-exposure to metals was associated with fixed AO [relative risk (RR) 1.71, 95% CI 1.03-2.85] and fixed AO lower limit of normal (RR 1.67, 95% CI 1.00-2.78). Women had lower cumulative EU years to chlorinated solvents [mean 20.9, standard deviation (SD) 13.4] than men (mean 28.6, SD 36.9). However, the risk of developing fixed AO and fixed AO plus low DLCO associated with each cumulative EU year of chlorinated solvents were higher among women than men (RR 1.08 versus 0.99, P-value for effect measure modification=0.006; RR 1.08 versus 1.00, P-value for effect measure modification=0.02). Conclusions We have shown ever-exposure to metals and chlorinated solvents are important risk factors for fixed AO. The effects for solvents were strongest among women. Preventive strategies need to be followed to reduce these exposures at the workplace.

  3. Dance Facilities.

    ERIC Educational Resources Information Center

    Ashton, Dudley, Ed.; Irey, Charlotte, Ed.

    This booklet represents an effort to assist teachers and administrators in the professional planning of dance facilities and equipment. Three chapters present the history of dance facilities, provide recommended dance facilities and equipment, and offer some adaptations of dance facilities and equipment, for elementary, secondary and college level…

  4. Seeking fixed points in multiple coupling scalar theories in the ɛ expansion

    NASA Astrophysics Data System (ADS)

    Osborn, Hugh; Stergiou, Andreas

    2018-05-01

    Fixed points for scalar theories in 4 - ɛ, 6 - ɛ and 3 - ɛ dimensions are discussed. It is shown how a large range of known fixed points for the four dimensional case can be obtained by using a general framework with two couplings. The original maximal symmetry, O( N), is broken to various subgroups, both discrete and continuous. A similar discussion is applied to the six dimensional case. Perturbative applications of the a-theorem are used to help classify potential fixed points. At lowest order in the ɛ-expansion it is shown that at fixed points there is a lower bound for a which is saturated at bifurcation points.

  5. Thiel embalming fluid--a new way to revive formalin-fixed cadaveric specimens.

    PubMed

    Hunter, Amanda; Eisma, Roos; Lamb, Clare

    2014-09-01

    By soft fixing cadavers using the Thiel embalming method, our cadavers now exhibit a greater degree of flexibility and color retention compared to that of traditional formalin-fixed cadavers. The aim of this experiment was to discover whether Thiel embalming fluid could be used to revive and soften the muscles of formalin-fixed prosected specimens. Earlier this year, two severely dehydrated formalin-fixed forearm and hand specimens were fully submerged in a tank containing Thiel embalming fluid. After a period of six months the specimens were removed from the tank and noticeable changes were observed in flexibility, quality of the tissue, and color of the specimens. © 2014 Wiley Periodicals, Inc.

  6. 32 CFR 37.305 - When may I use a fixed-support TIA?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false When may I use a fixed-support TIA? 37.305... Investment Agreements § 37.305 When may I use a fixed-support TIA? You may use a fixed-support TIA if: (a... ensure the desired level of cost sharing (see example in § 37.560(b)); and (c) Your TIA does not require...

  7. On Determining if Tree-based Networks Contain Fixed Trees.

    PubMed

    Anaya, Maria; Anipchenko-Ulaj, Olga; Ashfaq, Aisha; Chiu, Joyce; Kaiser, Mahedi; Ohsawa, Max Shoji; Owen, Megan; Pavlechko, Ella; St John, Katherine; Suleria, Shivam; Thompson, Keith; Yap, Corrine

    2016-05-01

    We address an open question of Francis and Steel about phylogenetic networks and trees. They give a polynomial time algorithm to decide if a phylogenetic network, N, is tree-based and pose the problem: given a fixed tree T and network N, is N based on T? We show that it is [Formula: see text]-hard to decide, by reduction from 3-Dimensional Matching (3DM) and further that the problem is fixed-parameter tractable.

  8. Development and application of a Controlled Release Facility (CRF) to validate flux quantifying methodologies.

    NASA Astrophysics Data System (ADS)

    Helmore, Jonathan

    2017-04-01

    The National Physical Laboratory, the UK's National Measurement Institute, has developed a novel facility capable of replicating the gaseous emission flux characteristics of a variety of real-word scenarios as may be found in small to medium scale industry and agriculture. The Controlled Release Facility (CRF) can be used to challenge conventional remote sensing techniques, as well as validate new Unmanned Aerial Vehicle (UAV) and distributed sensor network based methods, for source identification and flux calculation. The CRF method will be described and the results from three case studies will be discussed: The replication of an operational on-shore shale gas well using emissions of natural gas to atmosphere and measurements using Differential Absorption LIDAR (DIAL); the replication of fugitive volatile organic compounds emissions from a petrochemical unit and measurements using DIAL; and the replication of methane and carbon dioxide emissions from landfill and measurements using both fixed wing and multi-rotor UAVs.

  9. 78 FR 20705 - Fixed Income Roundtable

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... of fixed income markets. The roundtable will focus on the municipal securities, corporate bonds, and... corporate bonds and asset-backed securities. The participants in the third panel will discuss potential... discuss potential improvements to the market structure for corporate bonds and asset-backed securities...

  10. Fixed-Time Schedule Effects in Combination with Response-Dependent Schedules

    ERIC Educational Resources Information Center

    Borrero, John C.; Bartels-Meints, Jamie A.; Sy, Jolene R.; Francisco, Monica T.

    2011-01-01

    We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response…

  11. Rotary transformer design with fixed magnetizing and/or leakage inductances

    NASA Technical Reports Server (NTRS)

    Stuart, T. A.; King, R. J.; Shamseddin, H.

    1985-01-01

    A design algorithm is considered for transformers that must transfer electric power across a rotating interface. Among other features, this procedure allows the designer to minimize either weight or losses for either a fixed magnetizing inductance or a fixed leakage inductance. Numerical results are included to indicate the design trade-offs between various parameters.

  12. 48 CFR 1416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fixed-price contracts with economic price adjustment. 1416.203 Section 1416.203 Federal Acquisition Regulations System DEPARTMENT OF... Fixed-price contracts with economic price adjustment. ...

  13. 48 CFR 1416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Fixed-price contracts with economic price adjustment. 1416.203 Section 1416.203 Federal Acquisition Regulations System DEPARTMENT OF... Fixed-price contracts with economic price adjustment. ...

  14. 48 CFR 1416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Fixed-price contracts with economic price adjustment. 1416.203 Section 1416.203 Federal Acquisition Regulations System DEPARTMENT OF... Fixed-price contracts with economic price adjustment. ...

  15. 48 CFR 1416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Fixed-price contracts with economic price adjustment. 1416.203 Section 1416.203 Federal Acquisition Regulations System DEPARTMENT OF... Fixed-price contracts with economic price adjustment. ...

  16. 48 CFR 1416.203 - Fixed-price contracts with economic price adjustment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Fixed-price contracts with economic price adjustment. 1416.203 Section 1416.203 Federal Acquisition Regulations System DEPARTMENT OF... Fixed-price contracts with economic price adjustment. ...

  17. Fixed Junction Light Emitting Electrochemical Cells based on Polymerizable Ionic Liquids

    NASA Astrophysics Data System (ADS)

    Brown, Erin; Limanek, Austin; Bauman, James; Leger, Janelle

    Organic photovoltaic (OPV) devices are of interest due to ease of fabrication, which increases their cost-effectiveness. OPV devices based on fixed-junction light emitting electrochemical cells (LECs) in particular have shown promising results. LECs are composed of a layer of polymer semiconductor blended with a salt sandwiched between two electrodes. As a forward bias is applied, the ions within the polymer separate, migrate to the electrodes, and enable electrochemical doping, thereby creating a p-n junction analog. In a fixed junction device, the ions are immobilized after the desired distribution has been established, allowing for operation under reverse bias conditions. Fixed junctions can be established using various techniques, including chemically by mixing polymerizable salts that will bond to the polymer under a forward bias. Previously we have demonstrated the use of the polymerizable ionic liquid allyltrioctylammonium allysulfonate (ATOAAS) as an effective means of creating a chemically fixed junction in an LEC. Here we present the application of this approach to the creation of photovoltaic devices. Devices demonstrate higher open circuit voltages, faster charging, and an overall improved device performance over previous chemically-fixed junction PV devices.

  18. fixedTimeEvents: An R package for the distribution of distances between discrete events in fixed time

    NASA Astrophysics Data System (ADS)

    Liland, Kristian Hovde; Snipen, Lars

    When a series of Bernoulli trials occur within a fixed time frame or limited space, it is often interesting to assess if the successful outcomes have occurred completely at random, or if they tend to group together. One example, in genetics, is detecting grouping of genes within a genome. Approximations of the distribution of successes are possible, but they become inaccurate for small sample sizes. In this article, we describe the exact distribution of time between random, non-overlapping successes in discrete time of fixed length. A complete description of the probability mass function, the cumulative distribution function, mean, variance and recurrence relation is included. We propose an associated test for the over-representation of short distances and illustrate the methodology through relevant examples. The theory is implemented in an R package including probability mass, cumulative distribution, quantile function, random number generator, simulation functions, and functions for testing.

  19. Miniature Fixed Points as Temperature Standards for In Situ Calibration of Temperature Sensors

    NASA Astrophysics Data System (ADS)

    Hao, X. P.; Sun, J. P.; Xu, C. Y.; Wen, P.; Song, J.; Xu, M.; Gong, L. Y.; Ding, L.; Liu, Z. L.

    2017-06-01

    Miniature Ga and Ga-In alloy fixed points as temperature standards are developed at National Institute of Metrology, China for the in situ calibration of temperature sensors. A quasi-adiabatic vacuum measurement system is constructed to study the phase-change plateaus of the fixed points. The system comprises a high-stability bath, a quasi-adiabatic vacuum chamber and a temperature control and measurement system. The melting plateau of the Ga fixed point is longer than 2 h at 0.008 W. The standard deviation of the melting temperature of the Ga and Ga-In alloy fixed points is better than 2 mK. The results suggest that the melting temperature of the Ga or Ga-In alloy fixed points is linearly related with the heating power.

  20. Can evolutionary constraints explain the rarity of nitrogen-fixing trees in high-latitude forests?

    PubMed

    Menge, Duncan N L; Crews, Timothy E

    2016-09-01

    Contents 1195 I. 1195 II. 1196 III. 1196 IV. 1200 1200 References 1200 SUMMARY: The rarity of symbiotic nitrogen (N)-fixing trees in temperate and boreal ('high-latitude') forests is curious. One explanation - the evolutionary constraints hypothesis - posits that high-latitude N-fixing trees are rare because few have evolved. Here, we consider traits necessary for high-latitude N-fixing trees. We then use recent developments in trait evolution to estimate that > 2000 and > 500 species could have evolved from low-latitude N-fixing trees and high-latitude N-fixing herbs, respectively. Evolution of N-fixing from nonfixing trees is an unlikely source of diversity. Dispersal limitation seems unlikely to limit high-latitude N-fixer diversity. The greater number of N-fixing species predicted to evolve than currently inhabit high-latitude forests suggests a greater role for ecological than evolutionary constraints. © 2016 The Authors. New Phytologist © 2016 New Phytologist Trust.

  1. Masslessness of ghosts in equivariantly gauge-fixed Yang-Mills theories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Golterman, Maarten; Zimmerman, Leah

    2005-06-01

    We show that the one-loop ghost self-energy in an equivariantly gauge-fixed Yang-Mills theory vanishes at zero momentum. A ghost mass is forbidden by equivariant BRST symmetry, and our calculation confirms this explicitly. The four-ghost self interaction which appears in the equivariantly gauge-fixed Yang-Mills theory is needed in order to obtain this result.

  2. Non-Fixed Investment in Voluntary Public Goods Games

    NASA Astrophysics Data System (ADS)

    Wang, Shuai; Xu, Zhaojin; Zhang, Lianzhong

    2018-05-01

    In this work, we introduce a non-fixed investment ratio to the public goods games in which players can determine whether or not to participate and how much money to invest into the common pool, and with it a new mechanism has been established. We explicitly demonstrate a different rockscissors- paper dynamics which is a consequence of this model. Meanwhile, it is shown how the mechanism of non-fixed investment ratio influences the players' decision. In addition, we found that the length of memory has an important effect on the average payoff of the population by this introduction.

  3. Does a fixed-dollar premium contribution lower spending?

    PubMed

    Buchmueller, T C

    1998-01-01

    In a multiple-option health benefits program, the employer's premium contribution determines the incentives facing employees and participating health plans. Advocates of managed contribution argue that a fixed-dollar contribution policy will result in lower health spending by encouraging cost-conscious choices by employees and price competition among plans. The University of California (UC), which adopted a fixed-dollar contribution policy in 1994, provides a useful case study for assessing this claim. This DataWatch documents the effect of this policy on health maintenance organization (HMO) premiums and per employee health spending in the UC health benefits program.

  4. Greater Soil Carbon Sequestration under Nitrogen-fixing Trees Compared with Eucalyptus Species.

    Treesearch

    Sigrid C. Resh; Dan Binkley

    2002-01-01

    Forests with nitrogen-fixing trees (N–fixers) typically accumulate more carbon (C) in soils than similar forests without N–fixing trees. This difference may develop from fundamentally different processes, with either greater accumulation of recently fixed C or reduced decomposition of older soil C. We compared the soil C pools under N–fixers with Eucalyptus (non–N–...

  5. 24 CFR 84.80 - Conditions for use of Lump Sum (fixed price or fixed amount) grants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conditions are present: (1) The HUD funding amount is definitely less than the total actual cost of the....S.C. 403 (11), whichever is greater. (3) The project scope is very specific and adequate cost, historical, or unit pricing data is available to establish a fixed amount award with assurance that the...

  6. Three Boundary Conditions for Computing the Fixed-Point Property in Binary Mixture Data.

    PubMed

    van Maanen, Leendert; Couto, Joaquina; Lebreton, Mael

    2016-01-01

    The notion of "mixtures" has become pervasive in behavioral and cognitive sciences, due to the success of dual-process theories of cognition. However, providing support for such dual-process theories is not trivial, as it crucially requires properties in the data that are specific to mixture of cognitive processes. In theory, one such property could be the fixed-point property of binary mixture data, applied-for instance- to response times. In that case, the fixed-point property entails that response time distributions obtained in an experiment in which the mixture proportion is manipulated would have a common density point. In the current article, we discuss the application of the fixed-point property and identify three boundary conditions under which the fixed-point property will not be interpretable. In Boundary condition 1, a finding in support of the fixed-point will be mute because of a lack of difference between conditions. Boundary condition 2 refers to the case in which the extreme conditions are so different that a mixture may display bimodality. In this case, a mixture hypothesis is clearly supported, yet the fixed-point may not be found. In Boundary condition 3 the fixed-point may also not be present, yet a mixture might still exist but is occluded due to additional changes in behavior. Finding the fixed-property provides strong support for a dual-process account, yet the boundary conditions that we identify should be considered before making inferences about underlying psychological processes.

  7. Three Boundary Conditions for Computing the Fixed-Point Property in Binary Mixture Data

    PubMed Central

    Couto, Joaquina; Lebreton, Mael

    2016-01-01

    The notion of “mixtures” has become pervasive in behavioral and cognitive sciences, due to the success of dual-process theories of cognition. However, providing support for such dual-process theories is not trivial, as it crucially requires properties in the data that are specific to mixture of cognitive processes. In theory, one such property could be the fixed-point property of binary mixture data, applied–for instance- to response times. In that case, the fixed-point property entails that response time distributions obtained in an experiment in which the mixture proportion is manipulated would have a common density point. In the current article, we discuss the application of the fixed-point property and identify three boundary conditions under which the fixed-point property will not be interpretable. In Boundary condition 1, a finding in support of the fixed-point will be mute because of a lack of difference between conditions. Boundary condition 2 refers to the case in which the extreme conditions are so different that a mixture may display bimodality. In this case, a mixture hypothesis is clearly supported, yet the fixed-point may not be found. In Boundary condition 3 the fixed-point may also not be present, yet a mixture might still exist but is occluded due to additional changes in behavior. Finding the fixed-property provides strong support for a dual-process account, yet the boundary conditions that we identify should be considered before making inferences about underlying psychological processes. PMID:27893868

  8. Space Communications Emulation Facility

    NASA Technical Reports Server (NTRS)

    Hill, Chante A.

    2004-01-01

    Establishing space communication between ground facilities and other satellites is a painstaking task that requires many precise calculations dealing with relay time, atmospheric conditions, and satellite positions, to name a few. The Space Communications Emulation Facility (SCEF) team here at NASA is developing a facility that will approximately emulate the conditions in space that impact space communication. The emulation facility is comprised of a 32 node distributed cluster of computers; each node representing a satellite or ground station. The objective of the satellites is to observe the topography of the Earth (water, vegetation, land, and ice) and relay this information back to the ground stations. Software originally designed by the University of Kansas, labeled the Emulation Manager, controls the interaction of the satellites and ground stations, as well as handling the recording of data. The Emulation Manager is installed on a Linux Operating System, employing both Java and C++ programming codes. The emulation scenarios are written in extensible Markup Language, XML. XML documents are designed to store, carry, and exchange data. With XML documents data can be exchanged between incompatible systems, which makes it ideal for this project because Linux, MAC and Windows Operating Systems are all used. Unfortunately, XML documents cannot display data like HTML documents. Therefore, the SCEF team uses XML Schema Definition (XSD) or just schema to describe the structure of an XML document. Schemas are very important because they have the capability to validate the correctness of data, define restrictions on data, define data formats, and convert data between different data types, among other things. At this time, in order for the Emulation Manager to open and run an XML emulation scenario file, the user must first establish a link between the schema file and the directory under which the XML scenario files are saved. This procedure takes place on the command

  9. Fixed-rate layered multicast congestion control

    NASA Astrophysics Data System (ADS)

    Bing, Zhang; Bing, Yuan; Zengji, Liu

    2006-10-01

    A new fixed-rate layered multicast congestion control algorithm called FLMCC is proposed. The sender of a multicast session transmits data packets at a fixed rate on each layer, while receivers each obtain different throughput by cumulatively subscribing to deferent number of layers based on their expected rates. In order to provide TCP-friendliness and estimate the expected rate accurately, a window-based mechanism implemented at receivers is presented. To achieve this, each receiver maintains a congestion window, adjusts it based on the GAIMD algorithm, and from the congestion window an expected rate is calculated. To measure RTT, a new method is presented which combines an accurate measurement with a rough estimation. A feedback suppression based on a random timer mechanism is given to avoid feedback implosion in the accurate measurement. The protocol is simple in its implementation. Simulations indicate that FLMCC shows good TCP-friendliness, responsiveness as well as intra-protocol fairness, and provides high link utilization.

  10. Payment methods for outpatient care facilities.

    PubMed

    Yuan, Beibei; He, Li; Meng, Qingyue; Jia, Liying

    2017-03-03

    -after studies, interrupted time series, and repeated measures studies that compared different payment methods for outpatient health facilities. We defined outpatient care facilities in this review as facilities that provide health services to individuals who do not require hospitalisation or institutionalisation. We only included methods used to transfer funds from the purchaser of healthcare services to health facilities (including groups of individual professionals). These include global budgets, line-item budgets, capitation, fee-for-service (fixed and unconstrained), pay for performance, and mixed payment. The primary outcomes were service provision outcomes, patient outcomes, healthcare provider outcomes, costs for providers, and any adverse effects. At least two review authors independently extracted data and assessed the risk of bias. We conducted a structured synthesis. We first categorised the comparisons and outcomes and then described the effects of different types of payment methods on different categories of outcomes. We used a fixed-effect model for meta-analysis within a study if a study included more than one indicator in the same category of outcomes. We used a random-effects model for meta-analysis across studies. If the data for meta-analysis were not available in some studies, we calculated the median and interquartile range. We reported the risk ratio (RR) for dichotomous outcomes and the relative change for continuous outcomes. We included 21 studies from Afghanistan, Burundi, China, Democratic Republic of Congo, Rwanda, Tanzania, the United Kingdom, and the United States of health facilities providing primary health care and mental health care. There were three kinds of payment comparisons. 1) Pay for performance (P4P) combined with some existing payment method (capitation or different kinds of input-based payment) compared to the existing payment methodWe included 18 studies in this comparison, however we did not include five studies in the effects

  11. Fixed point theorems for generalized contractions in ordered metric spaces

    NASA Astrophysics Data System (ADS)

    O'Regan, Donal; Petrusel, Adrian

    2008-05-01

    The purpose of this paper is to present some fixed point results for self-generalized contractions in ordered metric spaces. Our results generalize and extend some recent results of A.C.M. Ran, M.C. Reurings [A.C.M. Ran, MEC. Reurings, A fixed point theorem in partially ordered sets and some applications to matrix equations, Proc. Amer. Math. Soc. 132 (2004) 1435-1443], J.J. Nieto, R. Rodríguez-López [J.J. Nieto, R. Rodríguez-López, Contractive mapping theorems in partially ordered sets and applications to ordinary differential equations, Order 22 (2005) 223-239; J.J. Nieto, R. Rodríguez-López, Existence and uniqueness of fixed points in partially ordered sets and applications to ordinary differential equations, Acta Math. Sin. (Engl. Ser.) 23 (2007) 2205-2212], J.J. Nieto, R.L. Pouso, R. Rodríguez-López [J.J. Nieto, R.L. Pouso, R. Rodríguez-López, Fixed point theorem theorems in ordered abstract sets, Proc. Amer. Math. Soc. 135 (2007) 2505-2517], A. Petrusel, I.A. Rus [A. Petrusel, I.A. Rus, Fixed point theorems in ordered L-spaces, Proc. Amer. Math. Soc. 134 (2006) 411-418] and R.P. Agarwal, M.A. El-Gebeily, D. O'Regan [R.P. Agarwal, M.A. El-Gebeily, D. O'Regan, Generalized contractions in partially ordered metric spaces, Appl. Anal., in press]. As applications, existence and uniqueness results for Fredholm and Volterra type integral equations are given.

  12. Worklife expectancies of fixed-term Finnish employees in 1997-2006.

    PubMed

    Nurminen, Markku

    2008-04-01

    Fixed-term employment is prevalent in the Finnish labor force. This form of employment contract is marked by fragmentary work periods, demands for flexibility in workhours, and concern for multiple insecurities. A nonpermanent employee may also incur adverse health consequences. Yet there exist no exact statistics on the duration of fixed-term employment. This paper estimated the future duration of the time that a Finn is expected to be engaged in irregular work. Multistate regression modeling and stochastic analysis were applied to aggregated data from surveys conducted among the labor force by Statistics Finland in 1997-2006. In 2006, a Finnish male was expected to work a total of 3.8 years in fixed-term employment, combined over consecutive or separate time spans; this time amounts to 8% of his remaining work career from entry into the work force until final retirement. For a woman the expectancy was greater, 6.5 years or 13%. For the age interval 20-29 years, the total was 16% for men and 23% for women. The type and duration of employment is influenced by security factors and economic cycles, both of which affect men and women differently. Over the past decade, fixed-term employment increased consistently in the female labor contingent, and it was more pronounced during economic slowdowns. This labor market development calls for standards for flexibility and guarantees for security in the fragmented future worklives of fixed-term employees.

  13. Fixing Maintenance Productivity.

    ERIC Educational Resources Information Center

    Fickes, Michael

    2003-01-01

    Describes how one university's facility managers use Nextel communications technology in conjunction with a Famis Software maintenance management system to improve the productivity of its maintenance technicians. The system uses a wireless Internet connection to automate the flow of work order information to and from technicians. The key to these…

  14. Noise power spectrum of the fixed pattern noise in digital radiography detectors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Dong Sik, E-mail: dskim@hufs.ac.kr; Kim, Eun

    Purpose: The fixed pattern noise in radiography image detectors is caused by various sources. Multiple readout circuits with gate drivers and charge amplifiers are used to efficiently acquire the pixel voltage signals. However, the multiple circuits are not identical and thus yield nonuniform system gains. Nonuniform sensitivities are also produced from local variations in the charge collection elements. Furthermore, in phosphor-based detectors, the optical scattering at the top surface of the columnar CsI growth, the grain boundaries, and the disorder structure causes spatial sensitivity variations. These nonuniform gains or sensitivities cause fixed pattern noise and degrade the detector performance, evenmore » though the noise problem can be partially alleviated by using gain correction techniques. Hence, in order to develop good detectors, comparative analysis of the energy spectrum of the fixed pattern noise is important. Methods: In order to observe the energy spectrum of the fixed pattern noise, a normalized noise power spectrum (NNPS) of the fixed pattern noise is considered in this paper. Since the fixed pattern noise is mainly caused by the nonuniform gains, we call the spectrum the gain NNPS. We first asymptotically observe the gain NNPS and then formulate two relationships to calculate the gain NNPS based on a nonuniform-gain model. Since the gain NNPS values are quite low compared to the usual NNPS, measuring such a low NNPS value is difficult. By using the average of the uniform exposure images, a robust measuring method for the gain NNPS is proposed in this paper. Results: By using the proposed measuring method, the gain NNPS curves of several prototypes of general radiography and mammography detectors were measured to analyze their fixed pattern noise properties. We notice that a direct detector, which is based on the a-Se photoconductor, showed lower gain NNPS than the indirect-detector case, which is based on the CsI scintillator. By comparing

  15. Crimp sealing of tubes flush with or below a fixed surface

    DOEpatents

    Fischer, Jon E.; Walmsley, Don; Wapman, P. Derek

    1996-01-01

    An apparatus for crimp sealing and severing tubes flush or below a fixed surface. Tube crimping below a fixed surface requires an asymmetric die and anvil configuration. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. This asymmetric die and anvil is used when a ductile metal tube and valve assembly are attached to a pressure vessel which has a fixed surface around the base of the tube at the pressure vessel. A flat anvil is placed against the tube. Die guides are placed against the tube on a side opposite the anvil. A pinch-off die is inserted into the die guides against the tube. Adequate clearance for inserting the die and anvil around the tube is needed below the fixed surface. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes.

  16. 29 CFR 1910.24 - Fixed industrial stairs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Walking-Working Surfaces § 1910.24 Fixed industrial stairs. (a... load anticipated but never of less strength than to carry safely a moving concentrated load of 1,000...

  17. Fixed-point theorems for families of weakly non-expansive maps

    NASA Astrophysics Data System (ADS)

    Mai, Jie-Hua; Liu, Xin-He

    2007-10-01

    In this paper, we present some fixed-point theorems for families of weakly non-expansive maps under some relatively weaker and more general conditions. Our results generalize and improve several results due to Jungck [G. Jungck, Fixed points via a generalized local commutativity, Int. J. Math. Math. Sci. 25 (8) (2001) 497-507], Jachymski [J. Jachymski, A generalization of the theorem by Rhoades and Watson for contractive type mappings, Math. Japon. 38 (6) (1993) 1095-1102], Guo [C. Guo, An extension of fixed point theorem of Krasnoselski, Chinese J. Math. (P.O.C.) 21 (1) (1993) 13-20], Rhoades [B.E. Rhoades, A comparison of various definitions of contractive mappings, Trans. Amer. Math. Soc. 226 (1977) 257-290], and others.

  18. Fixed-Time Outer Synchronization of Complex Networks with Noise Coupling

    NASA Astrophysics Data System (ADS)

    Shi, Hong-Jun; Miao, Lian-Ying; Sun, Yong-Zheng; Liu, Mao-Xing

    2018-03-01

    In this paper, the fixed-time outer synchronization of complex networks with noise coupling is investigated. Based on the theory of fixed-time stability and matrix inequalities, sufficient conditions for fixed-time outer synchronization are established and the estimation of the upper bound of the setting time is obtained. The result shows that the setting time can be adjusted to a desired value regardless of the initial states. Numerical simulations are performed to verify the effectiveness of the theoretical results. The effects of control parameters and the density of controlled nodes on the converging time are studied. Supported by the National Natural Science Foundation of China under Grant Nos. 11711530203 and 11771443, and the Fundamental Research Funds for the Central Universities under Grant No. 2015XKMS076

  19. 48 CFR 16.205 - Fixed-price contracts with prospective price redetermination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price contracts with prospective price redetermination. 16.205 Section 16.205 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 16.205...

  20. 10 CFR 73.40 - Physical protection: General requirements at fixed sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Physical protection: General requirements at fixed sites. 73.40 Section 73.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.40 Physical protection: General...

  1. 10 CFR 73.40 - Physical protection: General requirements at fixed sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Physical protection: General requirements at fixed sites. 73.40 Section 73.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.40 Physical protection: General...

  2. 48 CFR 16.403-2 - Fixed-price incentive (successive targets) contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (successive targets) contracts. 16.403-2 Section 16.403-2 Federal Acquisition Regulations System FEDERAL... Fixed-price incentive (successive targets) contracts. (a) Description. (1) A fixed-price incentive (successive targets) contract specifies the following elements, all of which are negotiated at the outset: (i...

  3. 48 CFR 16.403-2 - Fixed-price incentive (successive targets) contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (successive targets) contracts. 16.403-2 Section 16.403-2 Federal Acquisition Regulations System FEDERAL... Fixed-price incentive (successive targets) contracts. (a) Description. (1) A fixed-price incentive (successive targets) contract specifies the following elements, all of which are negotiated at the outset: (i...

  4. 47 CFR 22.603 - 488-494 MHz fixed service in Hawaii.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false 488-494 MHz fixed service in Hawaii. 22.603 Section 22.603 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES... fixed service in Hawaii. Before filing applications for authorization of inter-island control and/or...

  5. 10 CFR 73.40 - Physical protection: General requirements at fixed sites.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Physical protection: General requirements at fixed sites. 73.40 Section 73.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.40 Physical protection: General...

  6. 10 CFR 73.40 - Physical protection: General requirements at fixed sites.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Physical protection: General requirements at fixed sites. 73.40 Section 73.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.40 Physical protection: General...

  7. 47 CFR 25.140 - Qualifications of Fixed-Satellite space station licensees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Qualifications of Fixed-Satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of Fixed-Satellite space station licensees. (a) [Reserved] (b) Each applicant for a space station...

  8. FixO3 project results, legacy and module migration to EMSO

    NASA Astrophysics Data System (ADS)

    Lampitt, Richard

    2017-04-01

    The fixed point open ocean observatory network (FixO3) project is an international project aimed at integrating in a single network all fixed point open ocean observatories operated by European organisations and to harmonise and coordinate technological, procedural and data management across the stations. The project is running for four years since September 2013 with 29 partners across Europe and a budget of 7M Euros and is now coming to its final phase. In contrast to several past programmes, the opportunity has arisen to ensure that many of the project achievements can migrate into the newly formed European Multidisciplinary Seafloor and water column Observatory (EMSO) research infrastructure. The final phase of the project will focus on developing a strategy to transfer the results in an efficient way to maintain their relevance and maximise their use. In this presentation, we will highlight the significant achievements of FixO3 over the past three years focussing on the modules which will be transferred to EMSO in the coming 9 months. These include: 1. Handbook of best practices for operating fixed point observatories 2. Metadata catalogue 3. Earth Virtual Observatory (EarthVO) for data visualisation and comparison 4. Open Ocean Observatory Yellow Pages (O3YP) 5. Training material for hardware, data and data products used

  9. Side Effects in Time Discounting Procedures: Fixed Alternatives Become the Reference Point

    PubMed Central

    2016-01-01

    Typical research on intertemporal choice utilizes a two-alternative forced choice (2AFC) paradigm requiring participants to choose between a smaller sooner and larger later payoff. In the adjusting-amount procedure (AAP) one of the alternatives is fixed and the other is adjusted according to particular choices made by the participant. Such a method makes the alternatives unequal in status and is speculated to make the fixed alternative a reference point for choices, thereby affecting the decision made. The current study shows that fixing different alternatives in the AAP influences discount rates in intertemporal choices. Specifically, individuals’ (N = 283) choices were affected to just the same extent by merely fixing an alternative as when choices were preceded by scenarios explicitly imposing reference points. PMID:27768759

  10. Volcano fixes nitrogen into plant-available forms

    USGS Publications Warehouse

    Huebert, B.; Vitousek, P.; Sutton, J.; Elias, T.; Heath, J.; Coeppicus, S.; Howell, S.; Blomquist, B.

    1999-01-01

    Hawaiian montane ecosystems developing on recent tephra deposits contain more fixed nitrogen than conventional sources can explain. Heath and Huebert (1999) demonstrated that cloud water interception is the mechanism by which this extra nitrogen is deposited, but could not identify its source. We show here that atmospheric dinitrogen is fixed at the surface of active lava flows, producing concentrations of NO which are higher than those found in most urban rush hour air pollution. Over a period of hours this NO is blown away from the island and oxidized to nitrate. Interruptions in the trade wind flow can return this nitrate to the island to be deposited in cloud water. Thus, fixation on active lava flows is able to provide nitrogen to developing ecosystems on flows emplaced earlier.

  11. DNA Sequences from Formalin-Fixed Nematodes: Integrating Molecular and Morphological Approaches to Taxonomy

    PubMed Central

    Thomas, W. Kelley; Vida, J. T.; Frisse, Linda M.; Mundo, Manuel; Baldwin, James G.

    1997-01-01

    To effectively integrate DNA sequence analysis and classical nematode taxonomy, we must be able to obtain DNA sequences from formalin-fixed specimens. Microdissected sections of nematodes were removed from specimens fixed in formalin, using standard protocols and without destroying morphological features. The fixed sections provided sufficient template for multiple polymerase chain reaction-based DNA sequence analyses. PMID:19274156

  12. Fixed-interval performance and self-control in infants.

    PubMed Central

    Darcheville, J C; Rivière, V; Wearden, J H

    1993-01-01

    Twenty-six infants, 3 to 23 months old, were trained on fixed-interval schedules ranging from 10 s to 80 s. The operant response was touching an illuminated location on a touch-sensitive screen, and 20 s of cartoon presentation was the reinforcer. The subjects were also trained in a six-phase self-control procedure in which the critical phases involved choice between 20 s of cartoon available after a 0.5-s delay (impulsive choice) and 40 s of cartoon delayed for 40 s (self-controlled choice). All the youngest children (3 to 5 months) showed long postreinforcement pauses on the fixed-interval schedule, with most intervals involving the emission of a single, reinforced, response, and all made self-controlled choices. Older subjects (9 to 23 months) either produced the same pattern as the younger ones on the fixed-interval schedule (classified as pause-sensitive subjects) or produced short pauses and higher steady response rates (classified as pause-insensitive subjects). All pause-sensitive subjects made self-controlled choices in the self-control condition, and all pause-insensitive subjects made impulsive ones. PMID:8409821

  13. Florida Educational Fixed Capital Outlay Budgeting.

    ERIC Educational Resources Information Center

    King, Candice A.; Carpenter, James L.

    In July 1979, the Florida legislature commissioned a comprehensive evaluation of the state's educational fixed capital outlay (EFCO) program, through which the state funded all capital projects at all levels of public education. The study, completed for the 1980 legislative session, comprised 18 topical reports including EFCO funding recipients,…

  14. Raman imaging using fixed bandpass filter

    NASA Astrophysics Data System (ADS)

    Landström, L.; Kullander, F.; Lundén, H.; Wästerby, P.

    2017-05-01

    By using fixed narrow band pass optical filtering and scanning the laser excitation wavelength, hyperspectral Raman imaging could be achieved. Experimental, proof-of-principle results from the Chemical Warfare Agent (CWA) tabun (GA) as well as the common CWA simulant tributyl phosphate (TBP) on different surfaces/substrates are presented and discussed.

  15. 48 CFR 216.403-2 - Fixed-price incentive (successive targets) contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (successive targets) contracts. 216.403-2 Section 216.403-2 Federal Acquisition Regulations System DEFENSE... CONTRACTS Incentive Contracts 216.403-2 Fixed-price incentive (successive targets) contracts. See PGI 216.403-2 for guidance on the use of fixed-price incentive (successive targets) contracts. [71 FR 39007...

  16. 48 CFR 216.403-2 - Fixed-price incentive (successive targets) contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (successive targets) contracts. 216.403-2 Section 216.403-2 Federal Acquisition Regulations System DEFENSE... CONTRACTS Incentive Contracts 216.403-2 Fixed-price incentive (successive targets) contracts. See PGI 216.403-2 for guidance on the use of fixed-price incentive (successive targets) contracts. [71 FR 39007...

  17. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  18. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (MAY 2014) (a) Payment of...

  19. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  20. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  1. 48 CFR 52.232-5 - Payments Under Fixed-Price Construction Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Construction Contracts. 52.232-5 Section 52.232-5 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.232-5 Payments Under Fixed-Price Construction Contracts. As prescribed in 32.111(a)(5), insert the following clause: Payments Under Fixed-Price Construction Contracts (SEP 2002) (a) Payment of...

  2. Flow near a model spur dike with a fixed scoured bed

    USDA-ARS?s Scientific Manuscript database

    Three-dimensional flow velocities were measured using an acoustic Doppler velocimeter at a closely spaced grid over a fixed scoured bed with a submerged spur dike. Three-dimensional flow velocities were measured at 3484 positions around the trapezoidal shaped submerged model spur dike over a fixed ...

  3. OPEN AIR DEMOLITION OF FACILITIES HIGHLY CONTAMINATED WITH PLUTONIUM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LLOYD, E.R.

    2007-05-31

    The demolition of highly contaminated plutonium buildings usually is a long and expensive process that involves decontaminating the building to near free- release standards and then using conventional methods to remove the structure. It doesn't, however, have to be that way. Fluor has torn down buildings highly contaminated with plutonium without excessive decontamination. By removing the select source term and fixing the remaining contamination on the walls, ceilings, floors, and equipment surfaces; open-air demolition is not only feasible, but it can be done cheaper, better (safer), and faster. Open-air demolition techniques were used to demolish two highly contaminated buildings tomore » slab-on-grade. These facilities on the Department of Energy's Hanford Site were located in, or very near, compounds of operating nuclear facilities that housed hundreds of people working on a daily basis. To keep the facilities operating and the personnel safe, the projects had to be creative in demolishing the structures. Several key techniques were used to control contamination and keep it within the confines of the demolition area: spraying fixatives before demolition; applying fixative and misting with a fine spray of water as the buildings were being taken down; and demolishing the buildings in a controlled and methodical manner. In addition, detailed air-dispersion modeling was done to establish necessary building and meteorological conditions and to confirm the adequacy of the proposed methods. Both demolition projects were accomplished without any spread of contamination outside the modest buffer areas established for contamination control. Furthermore, personnel exposure to radiological and physical hazards was significantly reduced by using heavy equipment rather than ''hands on'' techniques.« less

  4. Rural-urban differences in end-of-life nursing home care: facility and environmental factors.

    PubMed

    Temkin-Greener, Helena; Zheng, Nan Tracy; Mukamel, Dana B

    2012-06-01

    This study examines urban-rural differences in end-of-life (EOL) quality of care provided to nursing home (NH) residents. We constructed 3 risk-adjusted EOL quality measures (QMs) for long-term decedent residents: in-hospital death, hospice referral before death, and presence of severe pain. We used CY2005-2007 100% Minimum Data Set, Medicare beneficiary file, and inpatient and hospice claims. Logistic regression models were estimated to predict the probability of each outcome conditional on decedents' risk factors. For each facility, QMs were calculated as the difference between the actual and the expected risk-adjusted outcome rates. We fit multivariate linear regression models, with fixed state effects, for each QM to assess the association with urban-rural location. We found urban-rural differences for in-hospital death and hospice QMs, but not for pain. Compared with NHs located in urban areas, facilities in smaller towns and in isolated rural areas have significantly (p < .001) worse EOL quality for in-hospital death and hospice use. Whereas the differences in these QMs are statistically significant between facilities located in large versus small towns, they are not statistically significant between facilities located in small towns and isolated rural areas. This study provides empirical evidence for urban-rural differences in EOL quality of care using a national sample of NHs. Identifying differences is a necessary first step toward improving care for dying NH residents and for bridging the urban-rural gap.

  5. Crimp sealing of tubes flush with or below a fixed surface

    DOEpatents

    Fischer, J.E.; Walmsley, D.; Wapman, P.D.

    1996-08-20

    An apparatus for crimp sealing and severing tubes flush or below a fixed surface. Tube crimping below a fixed surface requires an asymmetric die and anvil configuration. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. This asymmetric die and anvil is used when a ductile metal tube and valve assembly are attached to a pressure vessel which has a fixed surface around the base of the tube at the pressure vessel. A flat anvil is placed against the tube. Die guides are placed against the tube on a side opposite the anvil. A pinch-off die is inserted into the die guides against the tube. Adequate clearance for inserting the die and anvil around the tube is needed below the fixed surface. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. 8 figs.

  6. Development of the neurocranium after transsutural fixing by new, resorbable poly-L-lactide miniplates. A comparison to fixing with the common titanium miniplates.

    PubMed

    Antikainen, T; Pernu, H; Törmälä, P; Kallioinen, M; Waris, T; Serlo, W

    1994-01-01

    The right coronal sutures of twelve (12) newborn rabbits were fixed with commercially available, self-reinforced poly-L-lactide miniplates, with eight (8) rabbits sham treated with titanium miniplate fixation as reference experiments, in order to demonstrate the possible effects on skull growth. After six (6) months follow-up, both types of plate were detected to have caused a similar asymmetry in the neurocranium. Therefore, in our opinion, fixing across growing sutures, even with the new biodegradable devices, should be avoided.

  7. libFLASM: a software library for fixed-length approximate string matching.

    PubMed

    Ayad, Lorraine A K; Pissis, Solon P P; Retha, Ahmad

    2016-11-10

    Approximate string matching is the problem of finding all factors of a given text that are at a distance at most k from a given pattern. Fixed-length approximate string matching is the problem of finding all factors of a text of length n that are at a distance at most k from any factor of length ℓ of a pattern of length m. There exist bit-vector techniques to solve the fixed-length approximate string matching problem in time [Formula: see text] and space [Formula: see text] under the edit and Hamming distance models, where w is the size of the computer word; as such these techniques are independent of the distance threshold k or the alphabet size. Fixed-length approximate string matching is a generalisation of approximate string matching and, hence, has numerous direct applications in computational molecular biology and elsewhere. We present and make available libFLASM, a free open-source C++ software library for solving fixed-length approximate string matching under both the edit and the Hamming distance models. Moreover we describe how fixed-length approximate string matching is applied to solve real problems by incorporating libFLASM into established applications for multiple circular sequence alignment as well as single and structured motif extraction. Specifically, we describe how it can be used to improve the accuracy of multiple circular sequence alignment in terms of the inferred likelihood-based phylogenies; and we also describe how it is used to efficiently find motifs in molecular sequences representing regulatory or functional regions. The comparison of the performance of the library to other algorithms show how it is competitive, especially with increasing distance thresholds. Fixed-length approximate string matching is a generalisation of the classic approximate string matching problem. We present libFLASM, a free open-source C++ software library for solving fixed-length approximate string matching. The extensive experimental results presented here

  8. An Efficient Implementation of Fixed Failure-Rate Ratio Test for GNSS Ambiguity Resolution.

    PubMed

    Hou, Yanqing; Verhagen, Sandra; Wu, Jie

    2016-06-23

    Ambiguity Resolution (AR) plays a vital role in precise GNSS positioning. Correctly-fixed integer ambiguities can significantly improve the positioning solution, while incorrectly-fixed integer ambiguities can bring large positioning errors and, therefore, should be avoided. The ratio test is an extensively used test to validate the fixed integer ambiguities. To choose proper critical values of the ratio test, the Fixed Failure-rate Ratio Test (FFRT) has been proposed, which generates critical values according to user-defined tolerable failure rates. This contribution provides easy-to-implement fitting functions to calculate the critical values. With a massive Monte Carlo simulation, the functions for many different tolerable failure rates are provided, which enriches the choices of critical values for users. Moreover, the fitting functions for the fix rate are also provided, which for the first time allows users to evaluate the conditional success rate, i.e., the success rate once the integer candidates are accepted by FFRT. The superiority of FFRT over the traditional ratio test regarding controlling the failure rate and preventing unnecessary false alarms is shown by a simulation and a real data experiment. In the real data experiment with a baseline of 182.7 km, FFRT achieved much higher fix rates (up to 30% higher) and the same level of positioning accuracy from fixed solutions as compared to the traditional critical value.

  9. Facilities Performance Indicators Report 2013-14: Tracking Your Facilities Vital Signs

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, 2015

    2015-01-01

    This paper features an expanded Web-based "Facilities Performance Indicators (FPI) Report." The purpose of APPA: Association of Higher Education Facilities Officers (APPA's) Facilities Performance Indicators is to provide a representative set of statistics about facilities in educational institutions. "The Facilities Performance…

  10. 48 CFR 16.403-1 - Fixed-price incentive (firm target) contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (firm target) contracts. 16.403-1 Section 16.403-1 Federal Acquisition Regulations System FEDERAL... Fixed-price incentive (firm target) contracts. (a) Description. A fixed-price incentive (firm target) contract specifies a target cost, a target profit, a price ceiling (but not a profit ceiling or floor), and...

  11. 48 CFR 16.403-1 - Fixed-price incentive (firm target) contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (firm target) contracts. 16.403-1 Section 16.403-1 Federal Acquisition Regulations System FEDERAL... Fixed-price incentive (firm target) contracts. (a) Description. A fixed-price incentive (firm target) contract specifies a target cost, a target profit, a price ceiling (but not a profit ceiling or floor), and...

  12. 48 CFR 52.249-9 - Default (Fixed-Price Research and Development).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Research and Development). 52.249-9 Section 52.249-9 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.249-9 Default (Fixed-Price Research and Development). As prescribed in 49.504(b), insert the following clause: Default (Fixed-Price Research and Development) (APR 1984) (a)(1) The...

  13. 48 CFR 52.249-9 - Default (Fixed-Price Research and Development).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Research and Development). 52.249-9 Section 52.249-9 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.249-9 Default (Fixed-Price Research and Development). As prescribed in 49.504(b), insert the following clause: Default (Fixed-Price Research and Development) (APR 1984) (a)(1) The...

  14. 48 CFR 52.249-9 - Default (Fixed-Price Research and Development).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Research and Development). 52.249-9 Section 52.249-9 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.249-9 Default (Fixed-Price Research and Development). As prescribed in 49.504(b), insert the following clause: Default (Fixed-Price Research and Development) (APR 1984) (a)(1) The...

  15. 48 CFR 52.249-9 - Default (Fixed-Price Research and Development).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Research and Development). 52.249-9 Section 52.249-9 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.249-9 Default (Fixed-Price Research and Development). As prescribed in 49.504(b), insert the following clause: Default (Fixed-Price Research and Development) (APR 1984) (a)(1) The...

  16. 48 CFR 52.249-9 - Default (Fixed-Price Research and Development).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Research and Development). 52.249-9 Section 52.249-9 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.249-9 Default (Fixed-Price Research and Development). As prescribed in 49.504(b), insert the following clause: Default (Fixed-Price Research and Development) (APR 1984) (a)(1) The...

  17. Outcome, transport times, and costs of patients evacuated by helicopter versus fixed-wing aircraft.

    PubMed Central

    Thomas, F.; Wisham, J.; Clemmer, T. P.; Orme, J. F.; Larsen, K. G.

    1990-01-01

    We determined the differences in transport times and costs for patients transported by fixed-wing aircraft versus helicopter at ranges of 101 to 150 radial miles, where fixed-wing and helicopter in-hospital transports commonly overlap. Statistical analysis failed to show a significant difference between the trauma-care patients transported by helicopter (n = 109) and those transported by fixed-wing (n = 86) for age, injury severity score, hospital length of stay, hospital mortality, or discharge disability score. The times in returning patients to the receiving hospital by helicopter (n = 104) versus fixed-wing (n = 509) did not differ significantly. Helicopter transport costs per mile ($24), however, were 400% higher than those of fixed-wing aircraft with its associated ground ambulance transport costs ($6). Thus, helicopter transport is economically unjustified for interhospital transports exceeding 100 radial miles when an efficient fixed-wing service exists. PMID:2389575

  18. Evaluation of metal-polymeric fixed partial prosthesis using optical coherence tomography

    NASA Astrophysics Data System (ADS)

    Sinescu, C.; Negrutiu, M. L.; Duma, V. F.; Marcauteanu, C.; Topala, F. I.; Rominu, M.; Bradu, A.; Podoleanu, A. Gh.

    2013-11-01

    Metal-Polymeric fixed partial prosthesis is the usual prosthetic treatment for many dental patients. However, during the mastication the polymeric component of the prosthesis is fractured and will be lost. This fracture is caused by the material defects or by the fracture lines trapped inside the esthetic components of the prosthesis. This will finally lead to the failure of the prosthetic treatment. Nowadays, there is no method of identification and forecast for the materials defects of the polymeric materials. The aim of this paper is to demonstrate the capability of Optical Coherence Tomography (OCT) as a non-invasive clinical method that can be used for the evaluation of metal-polymeric fixed partial prostheses. Twenty metal-polymeric fixed partial prostheses were used for this study. The esthetic component of the prostheses has been Adoro (Ivoclar). Optical investigations of the metal prostheses have revealed no material defects or fracture lines. All the prostheses were temporary cemented in the oral cavities of the patients for six month. The non-invasive method used for the investigations was OCT working in Time Domain mode at 1300 nm. The evaluations of the prostheses were performed before and after their cementation in the patient mouths. All the imagistic results were performed in 2D and than in 3D, after the reconstruction. The results obtained after the OCT evaluation allowed for the identification of 4 metal-polymeric fixed partial prostheses with material defects immediately after finishing the technological procedures. After 6 month in the oral environment other 3 fixed partial prostheses revealed fracture lines. In conclusion, OCT proved to be a valuable tool for the noninvasive evaluation of the metal-polymeric fixed partial prostheses.

  19. FixO3 : Early progress towards Open Ocean observatory Data Management Harmonisation

    NASA Astrophysics Data System (ADS)

    Pagnani, Maureen; Huber, Robert; Lampitt, Richard

    2014-05-01

    Since 2002 there has been a sustained effort, supported as European framework projects, to harmonise both the technology and the data management of Open Ocean fixed observatories run by European nations. FixO3 started in September 2013, and for 4 years will coordinate the convergence of data management best practice across a constellation of moorings in the Atlantic, in both hemispheres, and in the Mediterranean. To ensure the continued existence of these unique sources of oceanographic data as sustained observatories it is vital to improve access to the data collected, both in terms of methods of presentation, real-time availability, long-term archiving and quality assurance. The data management component of FixO3 will improve access to marine observatory data by harmonizing data management standards and workflows covering the complete life cycle of data from real time data acquisition to long-term archiving. Legal and data policy aspects will be examined to identify transnational barriers to open-access to marine observatory data. A harmonised FixO3 data policy is being synthesised from the partner's existing policies, which will overcome the identified barriers, and provide a formal basis for data exchange between FixO3 infrastructures. Presently, the interpretation and implementation of accepted standards has considerable incompatibilities within the observatory community, and these different approaches will be unified into the FixO3 approach. Further, FixO3 aims to harmonise data management and standardisation efforts with other European and international marine data and observatory infrastructures. The FixO3 synthesis will build on the standards established in other European infrastructures such as EDMONET, SEADATANET, PANGAEA, EuroSITES (European contribution to JCOMMP OceanSITES programme), and MyOcean (the Marine Core Service for GMES) infrastructures as well as relevant international infrastructures and data centres such as the ICOS Ocean Thematic Centre

  20. Characterization of metal adsorption kinetic properties in batch and fixed-bed reactors.

    PubMed

    Chen, J Paul; Wang, Lin

    2004-01-01

    Copper adsorption kinetic properties in batch and fixed-bed reactors were studied in this paper. The isothermal adsorption experiments showed that the copper adsorption capacity of a granular activated carbon (Filtrasorb 200) increased when ionic strength was higher. The presence of EDTA diminished the adsorption. An intraparticle diffusion model and a fixed-bed model were successfully used to describe the batch kinetic and fixed-bed operation behaviors. The kinetics became faster when the solution pH was not controlled, implying that the surface precipitation caused some metal uptake. The external mass transfer coefficient, the diffusivity and the dispersion coefficient were obtained from the modeling. It was found that both external mass transfer and dispersion coefficients increased when the flow rate was higher. Finally effects of kinetic parameters on simulation of fixed-bed operation were conducted.