Sample records for facility agreement plans

  1. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Facility agreements. 716.6 Section 716... ROUTINE INSPECTIONS OF DECLARED FACILITIES § 716.6 Facility agreements. (a) Description and requirements. A facility agreement is a site-specific agreement between the U.S. Government and the OPCW. Its...

  2. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Facility agreements. 716.6 Section 716... ROUTINE INSPECTIONS OF DECLARED FACILITIES § 716.6 Facility agreements. (a) Description and requirements. A facility agreement is a site-specific agreement between the U.S. Government and the OPCW. Its...

  3. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  4. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  5. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 9 2011-10-01 2011-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  6. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 9 2014-10-01 2014-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  7. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 9 2013-10-01 2013-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  8. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  9. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  10. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS INITIAL AND... inspection because of the type or amount of chemicals it produces, processes or consumes. (1) Schedule 1... 1 chemicals. (2) Schedule 2 plant sites. The USNA will ensure that such facility agreements are...

  11. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  12. 23 CFR 450.314 - Metropolitan planning agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Metropolitan planning agreements. 450.314 Section 450.314 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.314...

  13. 23 CFR 450.314 - Metropolitan planning agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Metropolitan planning agreements. 450.314 Section 450.314 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.314...

  14. 23 CFR 450.314 - Metropolitan planning agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Metropolitan planning agreements. 450.314 Section 450.314 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.314...

  15. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  16. Planning and Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.

    Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…

  17. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified

  18. Integrated Facilities and Infrastructure Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reisz Westlund, Jennifer Jill

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less

  19. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  20. 23 CFR 450.314 - Metropolitan planning agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Metropolitan planning agreements. (a) The MPO, the State(s), and the public transportation operator(s) shall...(s), and the public transportation operator(s) serving the MPA. To the extent possible, a single... agreement among the MPOs, the State(s), and the public transportation operator(s) describing how the...

  1. Agreement on FY 1990 budget plan

    NASA Astrophysics Data System (ADS)

    The Bush administration has reached agreement with congressional leaders over a thumbnail version of the Fiscal Year 1990 budget. The plan contains few details but could have implications for NASA's Space Station Freedom and other big science projects.Overall, the budget agreement would achieve Gramm-Rudman-Hollings targets for budget deficit reduction without raising taxes, mostly through accounting manipulation and unspecified cuts in social programs. But a supplemental bill that calls for $1.2 billion in new spending for FY 1989 is expected to go to the House floor soon. That measure would violate the new agreement and add to the deficit.

  2. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  3. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  4. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  5. Effects of parallel planning on agreement production.

    PubMed

    Veenstra, Alma; Meyer, Antje S; Acheson, Daniel J

    2015-11-01

    An important issue in current psycholinguistics is how the time course of utterance planning affects the generation of grammatical structures. The current study investigated the influence of parallel activation of the components of complex noun phrases on the generation of subject-verb agreement. Specifically, the lexical interference account (Gillespie & Pearlmutter, 2011b; Solomon & Pearlmutter, 2004) predicts more agreement errors (i.e., attraction) for subject phrases in which the head and local noun mismatch in number (e.g., the apple next to the pears) when nouns are planned in parallel than when they are planned in sequence. We used a speeded picture description task that yielded sentences such as the apple next to the pears is red. The objects mentioned in the noun phrase were either semantically related or unrelated. To induce agreement errors, pictures sometimes mismatched in number. In order to manipulate the likelihood of parallel processing of the objects and to test the hypothesized relationship between parallel processing and the rate of agreement errors, the pictures were either placed close together or far apart. Analyses of the participants' eye movements and speech onset latencies indicated slower processing of the first object and stronger interference from the related (compared to the unrelated) second object in the close than in the far condition. Analyses of the agreement errors yielded an attraction effect, with more errors in mismatching than in matching conditions. However, the magnitude of the attraction effect did not differ across the close and far conditions. Thus, spatial proximity encouraged parallel processing of the pictures, which led to interference of the associated conceptual and/or lexical representation, but, contrary to the prediction, it did not lead to more attraction errors. Copyright © 2015 Elsevier B.V. All rights reserved.

  6. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  7. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  8. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  9. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  10. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  11. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  12. School Nutrition Facility Planning Guide.

    ERIC Educational Resources Information Center

    Pannell, Dorothy VanEgmond

    This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…

  13. Guidelines for Analysis of Health Facilities Planning in Developing Countries. Volume 5: Health Facilities Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Porter, Dennis R.; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this fifth of ten manuals in the International Health Planning Methods Series deals with health facilities planning in developing countries. While several specific…

  14. 24 CFR 582.400 - Grant agreement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Administration § 582.400 Grant agreement. (a) General. The...

  15. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only

  16. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  17. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less

  18. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, Juan; Anderson, Art

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less

  19. Planning Requirements for Small School Facilities.

    ERIC Educational Resources Information Center

    Davis, J. Clark; McQueen, Robert

    The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…

  20. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  1. Planning and Designing Safe Facilities

    ERIC Educational Resources Information Center

    Seidler, Todd

    2006-01-01

    Those who manage physical education, athletic, and recreation programs have a number of legal duties that they are expected to carry out. Among these are an obligation to take reasonable precautions to ensure safe programs and facilities for all participants, spectators, and staff. Physical education and sports facilities that are poorly planned,…

  2. The NTF as a national facility. [project planning

    NASA Technical Reports Server (NTRS)

    Nicks, O. W.

    1977-01-01

    Activities which led to the definition of the National Transonic Facility and the general agreements reached regarding its use and operations are reviewed. Topics discussed include: redefinition of test requirements, development of low cost options, consideration of a single transonic facility using existing hardware if feasible, facility concept recommendations, and acquisition schedule proposals.

  3. 23 CFR 450.314 - Metropolitan planning agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... among the State department of transportation, State air quality agency, affected local agencies, and the... within the nonattainment or maintenance area. The agreement must also indicate how the total... the designated agency for air quality planning under section 174 of the Clean Air Act (42 U.S.C. 7504...

  4. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  5. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  6. 42 CFR 417.801 - Agreements between CMS and health care prepayment plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Agreements between CMS and health care prepayment... CMS and health care prepayment plans. (a) General requirement. (1) In order to participate and receive... written agreement with CMS. (2) An existing group practice prepayment plan (GPPP) that continues as an...

  7. Hierarchy and Scope of Planning in Subject-Verb Agreement Production

    ERIC Educational Resources Information Center

    Gillespie, Maureen; Pearlmutter, Neal J.

    2011-01-01

    Two subject-verb agreement error elicitation studies tested the hierarchical feature-passing account of agreement computation in production and three timing-based alternatives: linear distance to the head noun, semantic integration, and a combined effect of both (a scope of planning account). In Experiment 1, participants completed subject noun…

  8. Facility Planning for Physical Education, Recreation, and Athletics.

    ERIC Educational Resources Information Center

    Flynn, Richard B., Ed.

    This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…

  9. Planning Physical Education and Athletic Facilities in Schools.

    ERIC Educational Resources Information Center

    Penman, Kenneth A.

    This book is primarily designed for a course in planning physical education and athletic facilities and as a supplementary textbook for administration courses. It illustrates the skills necessary for designing and planning facilities, stresses the need for effective communication between planners and users, and covers elementary through college…

  10. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  11. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  12. Information security management system planning for CBRN facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  13. PERT Planning for Physical Educational Facilities.

    ERIC Educational Resources Information Center

    Moriarty, R. J.

    1973-01-01

    Because of the high degree of interest in education and physical education in Canada, there has been a phenomenal growth in physical education facilities. Physical educators must become facility specialists in order to contribute to the planning, procurement, and utilization of the new complexes that are being developed. Among the most difficult…

  14. PLANNING THE INDOOR PHYSICAL EDUCATION FACILITIES.

    ERIC Educational Resources Information Center

    HASE, GERALD J.; HICK, BASIL L.

    THIS PAMPHLET IS DESIGNED TO HELP ARCHITECTS AND LOCAL SCHOOL OFFICIALS IN THE PREPARATION OF PLANS FOR PHYSICAL EDUCATION FACILITIES IN NEW AND EXISTING BUILDINGS. FACILITIES MENTIONED INCLUDE--(1) GYMNASIUM, (2) SWIMMING POOL, (3) SMALL GROUP ACTIVITY ROOM, (4) DRESSING AND SHOWERING ROOMS, (5) TEAM ROOM, (6) EQUIPMENT DRYING ROOM, (7) LAUNDRY…

  15. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES FOR CENTRAL SCHOOLS. PLANNING THE OUTDOOR PHYSICAL EDUCATION FACILITIES, NO. 10.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    PLANNING OUTDOOR PHYSICAL EDUCATION FACILITIES FOR THE CENTRAL SCHOOL SERVING PUPILS FROM KINDERGARTEN THROUGH HIGH SCHOOL SHOULD TAKE INTO ACCOUNT THE NEEDS AND INTERESTS OF ALL PUPILS DURING THE SCHOOL YEAR AND SHOULD PROVIDE FOR RECREATION NEEDS DURING VACATION PERIODS. PROVISION FOR RECREATIONAL FACILITIES FOR ADULTS SHOULD ALSO BE MADE. THE…

  16. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  17. 25 CFR 163.70 - Purpose of agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...

  18. 25 CFR 163.70 - Purpose of agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...

  19. 25 CFR 163.70 - Purpose of agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...

  20. 25 CFR 163.70 - Purpose of agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...

  1. 25 CFR 163.70 - Purpose of agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs; (2) Develop and publish cooperative environmental education and natural resource planning materials; and (3) Perform land and facility improvements, including forestry and other natural resources... related to land and natural resource management. (b) The Secretary may enter into such agreements when he...

  2. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  3. JESS facility modification and environmental/power plans

    NASA Technical Reports Server (NTRS)

    Bordeaux, T. A.

    1984-01-01

    Preliminary plans for facility modifications and environmental/power systems for the JESS (Joint Exercise Support System) computer laboratory and Freedom Hall are presented. Blueprints are provided for each of the facilities and an estimate of the air conditioning requirements is given.

  4. Minnesota urban partnership agreement national evaluation : telecommuting test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the telecommuting test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing str...

  5. Planning for Future Forms of Education: Towards an Educational and Educational Facilities Planning Model.

    ERIC Educational Resources Information Center

    Leu, Donald J.

    The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…

  6. Guidelines for Planning in Colleges and Universities. Volume 4: Physical Plant Planning, Facilities Studies.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…

  7. 40 CFR Appendix F to Part 112 - Facility-Specific Response Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...

  8. Minnesota urban partnership agreement national evaluation : tolling test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the test plan for collecting and analyzing toll data for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing co...

  9. Computer-Assisted School Facility Planning with ONPASS.

    ERIC Educational Resources Information Center

    Urban Decision Systems, Inc., Los Angeles, CA.

    The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…

  10. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  11. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    ERIC Educational Resources Information Center

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  12. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... compliance agreement shall specify the requirements necessary to prevent spread of plant pests from the facility, requirements to ensure the processing method effectively destroys plant pests, and the requirements for the application of chemical materials in accordance with part 305 of this chapter. The...

  13. 7 CFR 319.40-8 - Processing at facilities operating under compliance agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... compliance agreement shall specify the requirements necessary to prevent spread of plant pests from the facility, requirements to ensure the processing method effectively destroys plant pests, and the requirements for the application of chemical materials in accordance with part 305 of this chapter. The...

  14. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to... environmental and social considerations. (See appendix A to this subpart.) (c) EPA requires full compliance with... be initiated before award of a step 1 grant or written approval of a plan of study (see § 35.920-3(a...

  15. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  17. A Guide for Planning Indoor Facilities for College Physical Education.

    ERIC Educational Resources Information Center

    Crawford, Wayne H.

    Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…

  18. Minnesota urban partnership agreement national evaluation : content analysis test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the content analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing ...

  19. Space Guidelines for Planning Educational Facilities. Planning for Education.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    In 1983 the Oklahoma Legislature adopted facility guidelines for the purpose of defining, organizing, and encouraging the planning of adequate environments for education. The guidelines contained in this booklet have been designed to allow for the requirements of all Oklahoma school districts regardless of size or educational program. The…

  20. Minnesota urban partnership agreement national evaluation : safety data test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  1. Minnesota urban partnership agreement national evaluation : exogenous factors test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the exogenous factors test plan for the national evaluation of the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reduc...

  2. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  3. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  4. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  5. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  6. 77 FR 47399 - Funding Opportunity: Tribal Self-Governance Program; Planning Cooperative Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... timely and efficient. Planning helps to identify issues in advance and ensures that the Tribe is fully... and financial management capability. Applicants are required to submit complete annual audit reports... the Planning Cooperative Agreement, the Tribe has had no uncorrected significant and material audit...

  7. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  8. 78 FR 37828 - Tribal Self-Governance Program Planning Cooperative Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Indian Health Service Tribal Self-Governance Program... Authority The Indian Health Service (IHS) Office of Tribal Self-Governance (OTSG) is accepting limited competition Planning Cooperative Agreement applications for the Tribal Self-Governance Program (TSGP). This...

  9. Creating order from chaos: part II: tactical planning for mass casualty and disaster response at definitive care facilities.

    PubMed

    Baker, Michael S

    2007-03-01

    Current events highlight the need for disaster preparedness. We have seen tsunamis, hurricanes, terrorism, and combat in the news every night. There are many variables in a disaster, such as damage to facilities, loss of critical staff members, and overwhelming numbers of casualties. Each medical treatment facility should have a plan for everything from caring for staff members to getting the laundry done and providing enhanced security or mortuary services. Communication and agreements with local, regional, and federal agencies are vital. Then we must train and drill to shape the tools to impose order on chaos and to provide the most care to the greatest number.

  10. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  11. Long-Range Facilities - Plan

    DTIC Science & Technology

    1981-07-31

    3. DATES COVERED 00-00-1981 to 00-00-1981 4. TITLE AND SUBTITLE Long-Range Facilities - Plan 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...sternwheeler “Mark Twain” for Disneyland and fabrication of eight 52 foot submarines for the Disneyland “Navy.” This was followed by fabrication of the masts...converting the PRESIDENT GRANT , PRESIDENT McKINLEY and PRESIDENT FILLMORE to container ships for American President Lines, Ltd. These ships were designed to

  12. Provision of family planning services in Tanzania: a comparative analysis of public and private facilities.

    PubMed

    Kakoko, Deodatus C; Ketting, Evert; Kamazima, Switbert R; Ruben, Ruerd

    2012-12-01

    Adherence to the policy guidelines and standards is necessary for family planning services. We compared public and private facilities in terms of provision of family planning services. We analyzed data from health facility questionnaire of the 2006 Tanzania Service Provision Assessment survey, based on 529 health facilities. Majority of public facilities (95.4%) offered family planning services, whereas more than half of private facilities (52.1%) did not offer those. Public facilities were more likely to offer modern contraceptives as compared to private facilities. However, private facilities were more likely to offer counseling on natural methods of family planning [AOR = 2.12 (1.15-3.92), P < or = 0.001]. Public facilities were more likely to report having guidelines or protocols for family planning services and various kinds of visual aids for family planning and STIs when compared to private facilities. This comparative analysis entails the need to enforce the standards of family planning services in Tanzania.

  13. Guidance for Preparing a Facility Plan. Revised Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)

  14. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  15. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  16. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR...: General Requirement § 456.401 State plan UR requirements and options; UR plan required for intermediate care facility services. (a) The State plan must provide that— (1) UR is performed for each ICF that...

  17. Facilities Planning Conference for Community-Junior College State-Level Personnel.

    ERIC Educational Resources Information Center

    Florida Univ., Gainesville. Inst. of Higher Education.

    This report on planning and developing facilities for community-junior colleges includes papers presented at a conference for state-level facility planners. The meeting covered the following areas: (1) development of physical facilities responsive to educational programs and community needs; (2) efficient use of existing facilities through…

  18. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  19. Planning the School Food Service Facilities. Revised 1967.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  20. Northrop Triga facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the Triga facility decontamination and decommissioning plan to the actual results and discusses key areas where operational activities were impacted upon by the final US Nuclear Regulatory Commission (NRC)-approved decontamination and decommissioning plan. Total exposures for fuel transfer were a factor of 4 less than planned. The design of the Triga reactor components allowed the majority of the components to be unconditionally released.

  1. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a... ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions... a schedule the State accepts and such schedule is inserted as a special condition of the grant...

  2. School Facilities Planning. Research Report Number 1974-2.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…

  3. San Francisco urban partnership agreement, national evaluation : content analysis test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, : and reactions of the public, policy makers, and other groups to the UPA projects for the San Francisco Urban : Partnership Agreement...

  4. Minnesota urban partnership agreement national evaluation : transit system data test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...

  5. Minnesota urban partnership agreement national evaluation : cost benefit analysis test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the cost benefit analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by emplo...

  6. Minnesota urban partnership agreement national evaluation : traffic system data test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...

  7. San Francisco urban partnership agreement, national evaluation : exogenous factors test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing exogenous factors data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects...

  8. San Francisco urban partnership agreement, national evaluation : environmental data test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing environmental data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects foc...

  9. A Guide for Planning and Construction of Public School Facilities in Georgia. School Food Service Facilities.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…

  10. 26 CFR 1.457-4 - Annual deferrals, deferral limitations, and deferral agreements under eligible plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... eligible plans of qualified police or firefighters. An eligible plan with participants that include... deferral agreements under eligible plans. 1.457-4 Section 1.457-4 Internal Revenue INTERNAL REVENUE SERVICE... under eligible plans. (a) Taxation of annual deferrals. Annual deferrals that satisfy the requirements...

  11. 26 CFR 1.457-4 - Annual deferrals, deferral limitations, and deferral agreements under eligible plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... eligible plans of qualified police or firefighters. An eligible plan with participants that include... deferral agreements under eligible plans. 1.457-4 Section 1.457-4 Internal Revenue INTERNAL REVENUE SERVICE... under eligible plans. (a) Taxation of annual deferrals. Annual deferrals that satisfy the requirements...

  12. 26 CFR 1.457-4 - Annual deferrals, deferral limitations, and deferral agreements under eligible plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... eligible plans of qualified police or firefighters. An eligible plan with participants that include... deferral agreements under eligible plans. 1.457-4 Section 1.457-4 Internal Revenue INTERNAL REVENUE SERVICE... under eligible plans. (a) Taxation of annual deferrals. Annual deferrals that satisfy the requirements...

  13. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  14. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  15. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  16. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  17. 40 CFR 112.6 - Qualified Facilities Plan Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I... unloading equipment, tank overflow, rupture, or leakage, or any other equipment known to be a source of... the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy. (b...

  18. Developing State Agency Facility Plans: A Guide to Planning and Implementation. Michigan Studies in Rehabilitation Utilization Series: 4.

    ERIC Educational Resources Information Center

    Miller, Juliet V.; Wargel, James F.

    Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…

  19. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  20. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  1. Planning the Library Media Center Facility for the 1990s and Beyond.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This manual presents recommendations for incorporating present and future technological changes into workable, efficient, pleasant school library media facilities in two major sections: Planning the Facility and Activity Areas. The first section addresses the planning process (appointing the building committee, evaluating the library media…

  2. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  3. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  4. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... Plans must address all the elements required for a response plan in Subpart B, Oil Spill Response Plans for Outer Continental Shelf Facilities, or Subpart D, Oil Spill Response Requirements for Facilities...

  5. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  6. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  7. 40 CFR 112.20 - Facility response plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental factors that the Regional Administrator determines to be relevant to protecting the environment... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Facility response plans. 112.20 Section 112.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...

  8. Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.

    PubMed

    Johnson, Doug; Ugaz, Jorge

    2016-09-01

    We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality. © 2016 The Population Council, Inc.

  9. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  10. 29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVEGRADE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVE-GRADE FLOOR LEVEL. INEEL DRAWING NUMBER 200-0633-00-287-106354. FLUOR NUMBER 5775-CPP-633-A-4. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  11. DFL, Canada's Space AIT Facilities - Current and Planned Capabilities

    NASA Astrophysics Data System (ADS)

    Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.

    2004-08-01

    The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.

  12. San Francisco urban partnership agreement, national evaluation : traveler information data test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing traveler information data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA proje...

  13. 31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR AT MEZZANINE AND LOWER LEVELS. INEEL DRAWING NUMBER 200-0633-00-287-106352. FLUOR NUMBER 5775-CPP-633-A-2. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  14. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  15. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  16. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  17. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  18. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  19. San Francisco urban partnership agreement, national evaluation : cost benefit analysis test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing cost and benefit data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects ...

  20. San Francisco urban partnership agreement, national evaluation : traffic system data test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing traffic system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects fo...

  1. San Francisco urban partnership agreement, national evaluation : transit system data test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing the transit system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA project...

  2. 30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE GRADE AND AT LEVEL OF OPERATING CORRIDOR. INEEL DRAWING NUMBER 200-0633-00-287-106351. FLUOR NUMBER 5775-CPP-633-A-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  3. Places and Spaces: Facility Planning for Handicapped Children and Adults.

    ERIC Educational Resources Information Center

    Aiello, Barbara, Ed.

    Intended for special educators and architectural designers, the book provides specifications and lists of resource materials on facility design for handicapped children and adults. In an overview, R. Vosbeck discusses the need for cooperation between architects and educators and relates his experiences in planning facilities for exceptional…

  4. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  6. Private sector's role in public school facility planning.

    DOT National Transportation Integrated Search

    2009-03-01

    This report explores the role of private consultants in the school facility planning process. : It focuses on such issues as school siting and local government and school district collaboration. : As such, it seeks to demonstrate the importance of th...

  7. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  8. North Carolina Public Schools Facility Standards. A Guide for Planning School Facilities.

    ERIC Educational Resources Information Center

    Knott, Gerald H.; Lora, James M.; Acker, Marjorie L.; Taynton, Steven; Logan, Gladys B.; Harrell, Ronald C.

    The State of North Carolina has developed a planning guide for those in the process of building, enlarging, or renovating school facilities. This guide defines and describes the educational spaces needed to support a modern, comprehensive educational program and sets minimal standards for the types and sizes of spaces required. It serves as a…

  9. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by

  10. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  11. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  12. Minnesota urban partnership agreement national evaluation : surveys, interviews, and focus groups test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the test plan for developing, conducting, and analyzing surveys, interviews, and focus groups for evaluating the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Prog...

  13. An integrated approach for facilities planning by ELECTRE method

    NASA Astrophysics Data System (ADS)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  14. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  15. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  16. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  17. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  18. 40 CFR Appendix G to Part 112 - Tier I Qualified Facility SPCC Plan

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Tier I Qualified Facility SPCC Plan G Appendix G to Part 112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Pt. 112, App. G Appendix G to Part 112—Tier I Qualified Facility SPCC Plan...

  19. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly andmore » the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)« less

  20. Site maps and facilities listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used formore » production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.« less

  1. Resource allocation planning with international components

    NASA Technical Reports Server (NTRS)

    Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David

    1993-01-01

    Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

  2. Five Recession-Driven Strategies for Planning and Managing Campus Facilities

    ERIC Educational Resources Information Center

    Rudden, Michael S.

    2010-01-01

    Colleges and universities continue to face significant fiscal challenges in the current recession. A review of ongoing campus facilities planning projects, coupled with a review of more than 30 recent campus master planning requests for proposals and the relevant literature, indicates that colleges and universities are finding innovative ways to…

  3. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  4. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  5. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  6. 33 CFR 154.1045 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Response plan development and... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or...

  7. Athletic Facilities: Planning, Designing, and Operating Today's Physical-Education Centers.

    ERIC Educational Resources Information Center

    Spoor, Dana L.

    1998-01-01

    Examines what should be featured in an athletic facility, how to plan for the many different sports and activities that will be housed, and how to get the community involved. Areas addressed include planning for locker rooms and storage, flooring and lighting, building code adherence, spectator seating, building security, and outdoor recreation…

  8. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  9. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  10. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Eligibility to elect an MA plan for senior housing..., Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan, the...

  11. 42 CFR 422.53 - Eligibility to elect an MA plan for senior housing facility residents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Eligibility to elect an MA plan for senior housing... Eligibility, Election, and Enrollment § 422.53 Eligibility to elect an MA plan for senior housing facility residents. (a) Basic eligibility requirements. To be eligible to elect an MA senior housing facility plan...

  12. 77 FR 73060 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility... for a fuel cycle facility (NUREG-1520) provides NRC staff guidance for reviewing and evaluating the...

  13. 30 CFR 254.3 - May I cover more than one facility in my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I cover more than one facility in my... INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE General § 254.3 May I cover more than one facility in my response plan? (a) Your response plan may be for a...

  14. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  15. Disaster Preparedness Planning and Facility Contingency Operations for Public Works

    DTIC Science & Technology

    1993-01-01

    Forces Reporting Disaster Preparedness and Logistical Support 20-37 General Concept Manpower Planning, Protection and Support Personal Protection...their military mission, economical importance, geographical location, and personal and public safety. The organization, preparedness plans and facility...for emergency medical support). (5) Issue personal protective gear and equipment, if necessary. (6) Determine existi- g contract outcome. All

  16. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  17. Facilities Standards and Planning Manual for New Jersey County Community Colleges.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Higher Education, Trenton. Office of Community Coll. Programs.

    After some general comments concerning all guidelines, planning standards are described for--(1) various types of new facilities, (2) expansion of present facilities, (3) minimum space requirements for a college, (4) net-to-gross space ratios, and (5) total project costs. Information regarding capital construction project submissions procedure is…

  18. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  19. Arms Control and Nonproliferation: A Catalog of Treaties and Agreements

    DTIC Science & Technology

    2011-03-23

    produced two agreements— the Interim Agreement ... on Certain Measures with Respect to the Limitation of...Iranian missile threat. The system was to include 10 interceptors based in Poland and a radar in the Czech Republic . Russia’s former President Putin and...that Moscow would not do so if the United States reversed its plan to emplace GMD facilities in Poland and the Czech Republic . Congress resisted the

  20. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... divide your response plan for OCS facilities into the sections specified in paragraph (b) and explained in the other sections of this subpart. The plan must have an easily found marker identifying each.... (ii) Contractual agreements. (iii) Worst case discharge scenario. (iv) Dispersant use plan. (v) In...

  1. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007

  2. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  3. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-FF03E15000] Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement, Ni... Environmental Impact Statement (FEIS) associated with an application received from NiSource Inc. (hereafter ``Ni... Endangered Species Act of 1973, as amended (ESA). If issued, the ITP would authorize NiSource to take 10...

  4. International Agreement on Planetary Protection

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The maintenance of a NASA policy, is consistent with international agreements. The planetary protection policy management in OSS, with Field Center support. The advice from internal and external advisory groups (NRC, NAC/Planetary Protection Task Force). The technology research and standards development in bioload characterization. The technology research and development in bioload reduction/sterilization. This presentation focuses on: forward contamination - research on the potential for Earth life to exist on other bodies, improved strategies for planetary navigation and collision avoidance, and improved procedures for sterile spacecraft assembly, cleaning and/or sterilization; and backward contamination - development of sample transfer and container sealing technologies for Earth return, improvement in sample return landing target assessment and navigation strategy, planning for sample hazard determination requirements and procedures, safety certification, (liaison to NEO Program Office for compositional data on small bodies), facility planning for sample recovery system, quarantine, and long-term curation of 4 returned samples.

  5. Elementary School Educational Specifications: Facilities Planning Standards. Edition III.

    ERIC Educational Resources Information Center

    Jefferson County School District R-1, Denver, CO.

    The Jefferson County School District (Denver, Colorado) has published this model standard for the planning and designing of new elementary schools, and the remodeling and modernizing existing schools. It describes the facility requirements to accommodate the instructional program, activities, and support functions to assist architects, school…

  6. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  7. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  8. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  9. Strategically Planning Avionics Laboratory’s Facilities for the Future

    DTIC Science & Technology

    1993-09-01

    Goldsboro Road Bethesda, Maryland 20817-5886 93 12 22 02 DISCLAIMII NOTICE THIS DOCUMENT IS BEST QUALITY AVAILABLE. THE COPY FURNISHLD TO DTIC CONTAINED A...Avionics Laboratory establish a multiyear strategy for improving its facility utilization nearly 7 years ago. That plan, which is still being implemented...experi- mental data transmission delays caused when on-line equipment is separated by as much as a mile. The plan - now nearly 7 years old - initiated

  10. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false State plan UR requirements and options; UR plan required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control:...

  11. 42 CFR 456.401 - State plan UR requirements and options; UR plan required for intermediate care facility services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false State plan UR requirements and options; UR plan required for intermediate care facility services. 456.401 Section 456.401 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control:...

  12. Long Range Facilities Master Plan: 1986-2000, San Diego Unified School District.

    ERIC Educational Resources Information Center

    Blair, Billie; And Others

    The Long-Range Facilities Master Plan presents solution strategies and financing methods for accommodating a projected student enrollment increase of 45,000 between 1986 and 2000. This increase, plus limited financial resources, school use studies, and recent legislation, necessitated the plan. The issues include housing students, facility…

  13. 33 CFR 106.405 - Format and content of the Facility Security Plan (FSP).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; (9) Security systems and equipment maintenance; (10) Security measures for access control; (11... Facility Security Plan (FSP). 106.405 Section 106.405 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES...

  14. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  15. 78 FR 67223 - Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ..., 72, et al. Proposed Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 and Amendments to Material Control and Accounting Regulations; Proposed Rules #0;#0... Guidance for Fuel Cycle Facility; Material Control and Accounting Plans and Completing NRC Form 327 AGENCY...

  16. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  17. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  18. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  19. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  20. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  1. Japan signs Ocean Agreement

    NASA Astrophysics Data System (ADS)

    The Ocean Research Institute of the University of Tokyo and the National Science Foundation (NSF) have signed a Memorandum of Understanding for cooperation in the Ocean Drilling Program (ODP). The agreement calls for Japanese participation in ODP and an annual contribution of $2.5 million in U.S. currency for the project's 9 remaining years, according to NSF.ODP is an international project whose mission is to learn more about the formation and development of the earth through the collection and examination of core samples from beneath the ocean. The program uses the drillship JOIDES Resolution, which is equipped with laboratories and computer facilities. The Joint Oceanographic Institutions for Deep Earth Sampling (JOIDES), an international group of scientists, provides overall science planning and program advice regarding ODP's science goals and objectives.

  2. Development of a Model for Planning an Educational Facility. [A] Practicum Report.

    ERIC Educational Resources Information Center

    Boughner, Wesley; And Others

    This publication is composed of two separate entities: a relatively brief manuscript entitled "Development of a Model for Planning an Educational Facility" and a much more lengthy Midi-Practicum Report that describes the implementation of the plans outlined in the first manuscript. Each of the three authors wrote one section of the first…

  3. 48 CFR 41.206 - Interagency agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Interagency agreements. 41... agreements. Agencies shall use interagency agreements (e.g., consolidated purchase, joint use, or cross-service agreements) when acquiring utility service or facilities from other Government agencies and shall...

  4. 48 CFR 41.206 - Interagency agreements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Interagency agreements. 41... agreements. Agencies shall use interagency agreements (e.g., consolidated purchase, joint use, or cross-service agreements) when acquiring utility service or facilities from other Government agencies and shall...

  5. 48 CFR 41.206 - Interagency agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Interagency agreements. 41... agreements. Agencies shall use interagency agreements (e.g., consolidated purchase, joint use, or cross-service agreements) when acquiring utility service or facilities from other Government agencies and shall...

  6. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BURBANK, D.A.

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less

  7. Capacity planning for batch and perfusion bioprocesses across multiple biopharmaceutical facilities.

    PubMed

    Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S

    2014-01-01

    Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2014 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers.

  8. A Comprehensive Laboratory Animal Facility Pandemic Response Plan

    PubMed Central

    Roble, Gordon S; Lingenhol, Naomi M; Baker, Bryan; Wilkerson, Amy; Tolwani, Ravi J

    2010-01-01

    The potential of a severe influenza pandemic necessitates the development of an organized, rational plan for continued laboratory animal facility operation without compromise of the welfare of animals. A comprehensive laboratory animal program pandemic response plan was integrated into a university-wide plan. Preparation involved input from all levels of organizational hierarchy including the IACUC. Many contingencies and operational scenarios were considered based on the severity and duration of the influenza pandemic. Trigger points for systematic action steps were based on the World Health Organization's phase alert criteria. One extreme scenario requires hibernation of research operations and maintenance of reduced numbers of laboratory animal colonies for a period of up to 6 mo. This plan includes active recruitment and cross-training of volunteers for essential personnel positions, protective measures for employee and family health, logistical arrangements for delivery and storage of food and bedding, the removal of waste, and the potential for euthanasia. Strategies such as encouraging and subsidizing cryopreservation of unique strains were undertaken to protect valuable research assets and intellectual property. Elements of this plan were put into practice after escalation of the pandemic alerts due to influenza A (H1N1) in April 2009. PMID:20858365

  9. Career Education Facilities: A Planning Guide for Space and Station Requirements. A Report

    ERIC Educational Resources Information Center

    Woodruff, Alan P.

    This publication provides the educational planner and the architect with some suggestions concerning models by which they may plan new flexible-use, shared-space facilities and supports the models with guidelines for the development of facilities and educational programs for occupational education. In addition to discussing the financial…

  10. Does a wife's education influence spousal agreement on approval of family planning?: Random-effects Modeling using data from two West African Countries.

    PubMed

    Hossain, Mian; Ahmed, Saifuddin; Rogers, Laurencia

    2014-05-01

    Spousal approval of family planning is critical for contraceptive use. Both contraceptive use rates and women's education are low in many West-African countries and this study examines the role of wives' education in spousal agreement on approval of family planning in two sub-Saharan West African countries. We used couples' data from Demographic Health Surveys in Senegal and in Niger, conducted in 2005 and 2006, respectively. Multiple logistic regression results using multilevel modeling show that the odds of spousal agreement on approval of family planning were slightly over three times [OR: 3.16; 95% CI: 1.32 to 7.57] in Senegal and were about three times [OR: 3.07; 95% CI: 1.64 to 5.76] in Niger higher for women with more than primary education. Findings suggest that improvement in women's education could lead to spousal agreement on approval of family planning, which may lead to use of family planning in sub-Saharan African countries.

  11. 29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, CABLE CHASE, SHIELDING TANK AND FRAME ASSEMBLY. F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-1. INEL INDEX CODE NUMBER: 075 0701 851 151970. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  12. 76 FR 9276 - Tank Vessel and Marine Transportation-Related Facility Response Plans for Hazardous Substances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...

  13. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  14. Developing a plan for primary health care facilities in Soweto, South Africa. Part II: Applying locational criteria.

    PubMed

    Doherty, J; Rispel, L; Webb, N

    1996-12-01

    This article is the second of a two-part series describing the development of a ten-year plan for primary health care facility development in Soweto. The first article concentrated on the political problems and general methodological approach of the project. This second article describes how the technical problem of planning in the context of scanty information was overcome. The reasoning behind the various assumptions and criteria which were used to assist the planning of the location of facilities is explained, as well as the process by which they were applied. The merits and limitations of this planning approach are discussed, and it is suggested that the approach may be useful to other facility planners, particularly in the developing world.

  15. Capacity Planning for Batch and Perfusion Bioprocesses Across Multiple Biopharmaceutical Facilities

    PubMed Central

    Siganporia, Cyrus C; Ghosh, Soumitra; Daszkowski, Thomas; Papageorgiou, Lazaros G; Farid, Suzanne S

    2014-01-01

    Production planning for biopharmaceutical portfolios becomes more complex when products switch between fed-batch and continuous perfusion culture processes. This article describes the development of a discrete-time mixed integer linear programming (MILP) model to optimize capacity plans for multiple biopharmaceutical products, with either batch or perfusion bioprocesses, across multiple facilities to meet quarterly demands. The model comprised specific features to account for products with fed-batch or perfusion culture processes such as sequence-dependent changeover times, continuous culture constraints, and decoupled upstream and downstream operations that permit independent scheduling of each. Strategic inventory levels were accounted for by applying cost penalties when they were not met. A rolling time horizon methodology was utilized in conjunction with the MILP model and was shown to obtain solutions with greater optimality in less computational time than the full-scale model. The model was applied to an industrial case study to illustrate how the framework aids decisions regarding outsourcing capacity to third party manufacturers or building new facilities. The impact of variations on key parameters such as demand or titres on the optimal production plans and costs was captured. The analysis identified the critical ratio of in-house to contract manufacturing organization (CMO) manufacturing costs that led the optimization results to favor building a future facility over using a CMO. The tool predicted that if titres were higher than expected then the optimal solution would allocate more production to in-house facilities, where manufacturing costs were lower. Utilization graphs indicated when capacity expansion should be considered. © 2013 The Authors Biotechnology Progress published by Wiley Periodicals, Inc. on behalf of American Institute of Chemical Engineers Biotechnol. Prog., 30:594–606, 2014 PMID:24376262

  16. Use of information systems in Air Force medical treatment facilities in strategic planning and decision-making.

    PubMed

    Yap, Glenn A; Platonova, Elena A; Musa, Philip F

    2006-02-01

    An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.

  17. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  18. 78 FR 21871 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... promulgated on May 10, 2006. Connecticut DEEP's State Plan is for implementing and enforcing provisions at... and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut; 111(d)/129 Revised State Plan for Large and Small Municipal Waste Combustors AGENCY: Environmental Protection Agency...

  19. Advanced Simulation in Undergraduate Pilot Training (ASUPT) Facility Utilization Plan.

    ERIC Educational Resources Information Center

    Hagin, William V.; Smith, James F.

    The capabilities of a flight simulation research facility located at Williams AFB, Arizona are described. Research philosophy to be applied is discussed. Long range and short range objectives are identified. A time phased plan for long range research accomplishment is described. In addition, some examples of near term research efforts which will…

  20. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  1. 75 FR 78952 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; Commonwealth of Virginia... Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION... request for EPA withdrawal of its section 111(d)/129 plan (the plan) approval for HMIWI units. Submittal...

  2. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  3. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less

  4. A Guide for Planning Facilities for Vocational Agriculture in Texas.

    ERIC Educational Resources Information Center

    Hindman, Neal; Eggenberger, Lewis

    A guide to assist those concerned in planning adequate, well-designed facilities for departments of vocational agriculture that will serve their communities in the future. The program of vocational agriculture is an integral part of the total educational program of a school and considerable thought and careful study should be given to locating the…

  5. 30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3859-46, Y&D Drawing 190833. Scales 1' = 50' and 1' = 10'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  6. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  7. 45 CFR 96.132 - Additional agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Additional agreements. 96.132 Section 96.132... Abuse Prevention and Treatment Block Grant § 96.132 Additional agreements. (a) With respect to... facility in its funding agreement. (c) The State shall coordinate prevention and treatment activities with...

  8. 24 CFR 583.400 - Grant agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Grant agreement. 583.400 Section 583... DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Administration § 583.400 Grant agreement. (a... of this part will be incorporated in a grant agreement executed by HUD and the recipient. (b...

  9. 45 CFR 96.132 - Additional agreements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Additional agreements. 96.132 Section 96.132... Abuse Prevention and Treatment Block Grant § 96.132 Additional agreements. (a) With respect to... facility in its funding agreement. (c) The State shall coordinate prevention and treatment activities with...

  10. Master Plan for Educational Facilities: Garwood, Union County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Garwood, New Jersey, is a small borough of 0.69 square miles with an estimated population in 1978 of 4,856 persons. This master plan for educational facilities begins with an overview of the district that describes its beginnings as an industrial community. A number of maps illustrate characteristics of the area including its topography,…

  11. Results of an Initial Field Study of New Techniques for Citizen Participation in Educational Facilities Planning.

    ERIC Educational Resources Information Center

    Zucker, Charles B.

    The utility of a particular citizen participation planning approach as applied to educational facilities planning is described. With the aid of a clear-cut decisionmaking procedure, citizens could participate effectively in the development of specific planning policy statements. Such statements could be used to discuss planning priorities, focus…

  12. 24 CFR 582.400 - Grant agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Grant agreement. 582.400 Section 582... DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Administration § 582.400 Grant agreement. (a) General. The grant agreement will be between HUD and the recipient. HUD will hold the recipient responsible for the...

  13. 24 CFR 585.402 - Grant agreement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Grant agreement. 585.402 Section 585... DEVELOPMENT COMMUNITY FACILITIES YOUTHBUILD PROGRAM Administration § 585.402 Grant agreement. (a) General. The... incorporated in a grant agreement executed by HUD and the recipient. (b) Enforcement. HUD will enforce the...

  14. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Submission and approval of facilities plan. 35.917-8 Section 35.917-8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  15. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Revision or amendment of facilities plan. 35.917-9 Section 35.917-9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  16. Facility Programming and Construction Criteria [Planning Guide]. 702 KAR 4:170.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Div. of Facilities Management.

    This facility construction planning guide presents the minimum instructional space standards for Kentucky's public school system. It provides definitions of terms found in the regulations; presents space requirements for every type of instructional space within a public school, including circulation areas, storage, and mechanical/electrical areas;…

  17. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moss, R. H.; Blohm, A. J.; Delgado, A.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before finalmore » conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and

  18. 7 CFR 301.89-7 - Compliance agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Compliance agreements. 301.89-7 Section 301.89-7... agreements. Persons who grow, handle, or move regulated articles may enter into a compliance agreement 3 if such persons review with an inspector each provision of the compliance agreement, have facilities and...

  19. Strategic planning and marketing research for older, inner-city health care facilities: a case study.

    PubMed

    Wood, V R; Robertson, K R

    1992-01-01

    Numerous health care facilities, located in downtown metropolitan areas, now find themselves surrounded by a decaying inner-city environment. Consumers may perceive these facilities as "old," and catering to an "urban poor" consumer. These same consumers may, therefore, prefer to patronize more modern facilities located in suburban areas. This paper presents a case study of such a health care facility and how strategic planning and marketing research were conducted in order to identify market opportunities and new strategic directions.

  20. FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING REMOTE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL LABORATORY, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-008-105065. ALTERNATE ID NUMBER 4272-14-102. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  2. FPEF (Fluid Physics Experiment Facility) for the planned MS (Marangoni Surface) experiment

    NASA Image and Video Library

    2009-07-01

    ISS020-E-016214 (1 July 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, prepares the Fluid Physics Experiment Facility (FPEF) for the planned Marangoni Surface experiment in the Kibo laboratory of the International Space Station.

  3. SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) WARM LABORATORY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) WARM LABORATORY ROOM, DECONTAMINATION ROOM, HOT CHEMISTRY LABORATORY, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-098-105066. ALTERNATE ID NUMBER 4272-14-103. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less

  5. Hazardous Waste Certification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance frommore » the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22.« less

  6. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  7. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  8. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  9. Funding the essentials: the Australian Health Care Agreements, 2003-2008.

    PubMed

    Deeble, John

    2002-01-01

    This editorial reviews a number of papers in a special issue of the Australian Health Review covering the Australian Health Care Agreements to be concluded by June 2003. These include a report on consultations by the Australian Healthcare Association with industry representatives from July-October 2002. For hospitals, the agreements will set the main financial parameters for the next five years. Apart from the quantum of Commonwealth grants, the issues seen as most important involved linkages with primary care providers and aged care facilities, the dominance of inpatient work in current arrangements, workforce planning and public/private sector relationships. The possibility of recent private health insurance changes reducing the sums available for public hospitals was noted. Some estimates are presented of the possible effects of private insurance reform, together with some data from a special AHA survey of public hospital activity this year.

  10. Impact of the Urban Reproductive Health Initiative on family planning uptake at facilities in Kenya, Nigeria, and Senegal.

    PubMed

    Winston, Jennifer; Calhoun, Lisa M; Corroon, Meghan; Guilkey, David; Speizer, Ilene

    2018-01-05

    The 2012 London Summit on Family Planning set ambitious goals to enable 120 million more women and adolescent girls to use modern contraceptives by 2020. The Urban Reproductive Health Initiative (URHI) was a Bill & Melinda Gates Foundation funded program designed to help contribute to these goals in urban areas in India, Kenya, Nigeria, and Senegal. URHI implemented a range of country-specific demand and supply side interventions, with supply interventions generally focused on improved service quality, provider training, outreach to patients, and commodity stock management. This study uses data collected by the Measurement, Learning & Evaluation (MLE) Project to examine the effectiveness of these supply-side interventions by considering URHI's influence on the number of family planning clients at health facilities over a four-year period in Kenya, Nigeria, and Senegal. The analysis used facility audits and provider surveys. Principal-components analysis was used to create country-specific program exposure variables for health facilities. Fixed-effects regression was used to determine whether family planning uptake increased at facilities with higher exposure. Outcomes of interest were the number of new family planning acceptors and the total number of family planning clients per reproductive health care provider in the last year. Higher program component scores were associated with an increase in new family planning acceptors per provider in Kenya (β = 18, 95% CI = 7-29), Nigeria (β = 14, 95% CI = 8-20), and Senegal (β = 7, 95% CI = 3-12). Higher scores were also associated with more family planning clients per provider in Kenya (β = 31, 95% CI = 7-56) and Nigeria (β = 26, 95% CI = 15-38), but not in Senegal. Supply-side interventions have increased the number of new family planning acceptors at facilities in urban Nigeria, Kenya, and Senegal and the overall number of clients in urban Nigeria and Kenya. While tailoring

  11. 76 FR 80865 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants; State of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Promulgation of State Plans for Designated Facilities and Pollutants; State of Florida; Control of Hospital/ Medical/Infectious Waste Incinerator (HMIWI) Emissions From Existing Facilities AGENCY: Environmental... Guidelines (EGs) applicable to existing Hospital/Medical/Infectious Waste Incinerators (HMIWIs). These EGs...

  12. 75 FR 61503 - Cooperative Agreement With the World Health Organization for a Plan to Develop a Global...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... and stakeholders. C. Eligibility Information The following organizations/institutions are eligible to...] Cooperative Agreement With the World Health Organization for a Plan to Develop a Global Integrated Food Safety Information Platform AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug...

  13. Master Plan for Educational Facilities: Midland Park, Bergen County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Midland Park, New Jersey, is a small borough with an estimated population in 1978 of 8,500 persons. The first part of the master plan for educational facilities in the area begins with an overview using maps to illustrate characteristics including its topography, relationship to key population centers and major transportation routes, boundaries,…

  14. LPT. Shield test facility (TAN645 and 646). Floor plan and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645 and -646). Floor plan and room names. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-1. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107347 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  16. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  17. 24 CFR 248.315 - Preservation agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Preservation agreements. 248.315... agreements. (a) Agreements required. Owners of projects with State assisted or subsidized mortgages whose plans of action have been approved under § 248.307 shall enter into agreements, contracts and/or...

  18. 24 CFR 248.315 - Preservation agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Preservation agreements. 248.315... agreements. (a) Agreements required. Owners of projects with State assisted or subsidized mortgages whose plans of action have been approved under § 248.307 shall enter into agreements, contracts and/or...

  19. 24 CFR 248.315 - Preservation agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Preservation agreements. 248.315... agreements. (a) Agreements required. Owners of projects with State assisted or subsidized mortgages whose plans of action have been approved under § 248.307 shall enter into agreements, contracts and/or...

  20. 24 CFR 248.315 - Preservation agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Preservation agreements. 248.315... agreements. (a) Agreements required. Owners of projects with State assisted or subsidized mortgages whose plans of action have been approved under § 248.307 shall enter into agreements, contracts and/or...

  1. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  2. A Guide for Planning Facilities for Occupational Preparation Programs for Dental Laboratory Technicians. Research Series No. 34.

    ERIC Educational Resources Information Center

    Macconnell, James D., And Others

    The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…

  3. 3S (Safeguards, Security, Safety) based pyroprocessing facility safety evaluation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ku, J.H.; Choung, W.M.; You, G.S.

    The big advantage of pyroprocessing for the management of spent fuels against the conventional reprocessing technologies lies in its proliferation resistance since the pure plutonium cannot be separated from the spent fuel. The extracted materials can be directly used as metal fuel in a fast reactor, and pyroprocessing reduces drastically the volume and heat load of the spent fuel. KAERI has implemented the SBD (Safeguards-By-Design) concept in nuclear fuel cycle facilities. The goal of SBD is to integrate international safeguards into the entire facility design process since the very beginning of the design phase. This paper presents a safety evaluationmore » plan using a conceptual design of a reference pyroprocessing facility, in which 3S (Safeguards, Security, Safety)-By-Design (3SBD) concept is integrated from early conceptual design phase. The purpose of this paper is to establish an advanced pyroprocessing hot cell facility design concept based on 3SBD for the successful realization of pyroprocessing technology with enhanced safety and proliferation resistance.« less

  4. 40 CFR 35.917-7 - State review and certification of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false State review and certification of facilities plan. 35.917-7 Section 35.917-7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works...

  5. 7 CFR 1948.98 - Grant agreements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Grant agreements. 1948.98 Section 1948.98 Agriculture... § 1948.98 Grant agreements. The following Grant Agreements are a part of this regulation. (a) Exhibit A of this subpart is a Grant Agreement for Growth Management and Housing Planning Grants for approved...

  6. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Spill response plans for facilities located in...

  7. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  8. LPT. Shield test facility (TAN646). Floor plan for water treatment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-646). Floor plan for water treatment room on west facade, tank and filter locations in basement along service tunnel and in coupling station. Ralph M. Parsons 1229-17 ANP/GE-6-646-P-2. April 1957. INEEL Index code no. 037-0645/0646-51-693-107387 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  9. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Credit agreements. 1819... agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement as... Plan. The following provisions apply to all credit mentor-protégé agreements: (1) Developmental...

  10. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less

  11. A spatial national health facility database for public health sector planning in Kenya in 2008.

    PubMed

    Noor, Abdisalan M; Alegana, Victor A; Gething, Peter W; Snow, Robert W

    2009-03-06

    Efforts to tackle the enormous burden of ill-health in low-income countries are hampered by weak health information infrastructures that do not support appropriate planning and resource allocation. For health information systems to function well, a reliable inventory of health service providers is critical. The spatial referencing of service providers to allow their representation in a geographic information system is vital if the full planning potential of such data is to be realized. A disparate series of contemporary lists of health service providers were used to update a public health facility database of Kenya last compiled in 2003. These new lists were derived primarily through the national distribution of antimalarial and antiretroviral commodities since 2006. A combination of methods, including global positioning systems, was used to map service providers. These spatially-referenced data were combined with high-resolution population maps to analyze disparity in geographic access to public health care. The updated 2008 database contained 5,334 public health facilities (67% ministry of health; 28% mission and nongovernmental organizations; 2% local authorities; and 3% employers and other ministries). This represented an overall increase of 1,862 facilities compared to 2003. Most of the additional facilities belonged to the ministry of health (79%) and the majority were dispensaries (91%). 93% of the health facilities were spatially referenced, 38% using global positioning systems compared to 21% in 2003. 89% of the population was within 5 km Euclidean distance to a public health facility in 2008 compared to 71% in 2003. Over 80% of the population outside 5 km of public health service providers was in the sparsely settled pastoralist areas of the country. We have shown that, with concerted effort, a relatively complete inventory of mapped health services is possible with enormous potential for improving planning. Expansion in public health care in Kenya has

  12. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Spill response plans for facilities located in...

  13. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Spill response plans for facilities located in...

  14. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters Seaward... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Spill response plans for facilities located in...

  15. 30 CFR 254.50 - Spill response plans for facilities located in State waters seaward of the coast line.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Requirements for Facilities Located in State Waters... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Spill response plans for facilities located in...

  16. Foods served in child care facilities participating in the Child and Adult Care Food Program: Menu match and agreement with the new meal patterns and best practices

    USDA-ARS?s Scientific Manuscript database

    Our objective was to assess the agreement of posted menus with foods served to 3- to 5-year-old children attending federal Child and Adult Care Food Program (CACFP)-enrolled facilities, and the degree to which the facilities met the new meal patterns and best practices. On-site observations and menu...

  17. 40 CFR 355.10 - Must my facility comply with the emergency planning requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Must my facility comply with the emergency planning requirements of this subpart? 355.10 Section 355.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  18. 24 CFR 700.140 - Participatory agreement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Participatory agreement. 700.140... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... participant, the participant must sign a participatory agreement governing the utilization of the plan's...

  19. 24 CFR 700.140 - Participatory agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Participatory agreement. 700.140... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... participant, the participant must sign a participatory agreement governing the utilization of the plan's...

  20. 7 CFR 1944.259 - Participatory agreement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Participatory agreement. 1944.259 Section 1944.259... agreement. (a) Before actual acceptance into CHSP, potential participants must work with the PAC and the... participant, the participant must sign a participatory agreement governing the utilization of the plan's...

  1. Data Management Facility Operations Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  2. Factoring economic costs into conservation planning may not improve agreement over priorities for protection.

    PubMed

    Armsworth, Paul R; Jackson, Heather B; Cho, Seong-Hoon; Clark, Melissa; Fargione, Joseph E; Iacona, Gwenllian D; Kim, Taeyoung; Larson, Eric R; Minney, Thomas; Sutton, Nathan A

    2017-12-21

    Conservation organizations must redouble efforts to protect habitat given continuing biodiversity declines. Prioritization of future areas for protection is hampered by disagreements over what the ecological targets of conservation should be. Here we test the claim that such disagreements will become less important as conservation moves away from prioritizing areas for protection based only on ecological considerations and accounts for varying costs of protection using return-on-investment (ROI) methods. We combine a simulation approach with a case study of forests in the eastern United States, paying particular attention to how covariation between ecological benefits and economic costs influences agreement levels. For many conservation goals, agreement over spatial priorities improves with ROI methods. However, we also show that a reliance on ROI-based prioritization can sometimes exacerbate disagreements over priorities. As such, accounting for costs in conservation planning does not enable society to sidestep careful consideration of the ecological goals of conservation.

  3. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lombard, K.H.

    1994-08-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing newmore » and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.« less

  4. SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipriani, Ralph J.

    2014-12-01

    Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

  5. Planning of public healthcare facility using a location allocation modelling: A case study

    NASA Astrophysics Data System (ADS)

    Shariff, S. Sarifah Radiah; Moin, Noor Hasnah; Omar, Mohd

    2014-09-01

    Finding the correct location of any facility and determining the demands which are to be assigned to it is very crucial in public health service. This is to ensure that the public gain maximum benefits. This article analyzes the previous location decisions of public primary healthcare (PHC) facilities in the district of Kuala Langat, Malaysia. With total population of 220214 (in 2010), the PHC in the district is currently served by 28 facilities. The percentages of total population covered (in 2007) within the maximum allowable distance of 3km and 5km are 69.7 percent and 77.8 percent respectively. This is very low compared to the Malaysian National Health Policy of Health for All or 100 percent coverage. The determination of health facility location should be planned carefully to further increase effective primary health service to the nation that is required for economic sustainability.

  6. 49 CFR 367.20 - Fees under the Unified Carrier Registration Plan and Agreement for each registration year until...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Fees under the Unified Carrier Registration Plan and Agreement for each registration year until any subsequent adjustment in the fees becomes effective. 367.20 Section 367.20 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY ADMINISTRATION,...

  7. 7 CFR 1782.19 - Third party agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Director may authorize third party operation, maintenance, and management of an Agency financed facility. The borrower's attorney must review the contract, management agreement, written lease, or other third party agreement and issue an opinion to the Agency as to their legal sufficiency. The borrower shall...

  8. 12 CFR 704.16 - Contracts/written agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Contracts/written agreements. 704.16 Section 704.16 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.16 Contracts/written agreements. Services, facilities, personnel, or equipment...

  9. 12 CFR 725.21 - Modification of agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Modification of agreements. 725.21 Section 725.21 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS NATIONAL CREDIT UNION ADMINISTRATION CENTRAL LIQUIDITY FACILITY § 725.21 Modification of agreements. The...

  10. Master Plan for Educational Facilities: City of Clifton, Passaic County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Clifton, New Jersey, has a land area of just under 12 square miles with a population estimated in 1976 to be 83,592 persons. This master plan for educational facilities begins with an overview of the district and its historical background. A number of maps illustrate characteristics of the area, including its topography, relationship to key…

  11. D-Side: A Facility and Workforce Planning Group Multi-criteria Decision Support System for Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tavana, Madjid

    2005-01-01

    "To understand and protect our home planet, to explore the universe and search for life, and to inspire the next generation of explorers" is NASA's mission. The Systems Management Office at Johnson Space Center (JSC) is searching for methods to effectively manage the Center's resources to meet NASA's mission. D-Side is a group multi-criteria decision support system (GMDSS) developed to support facility decisions at JSC. D-Side uses a series of sequential and structured processes to plot facilities in a three-dimensional (3-D) graph on the basis of each facility alignment with NASA's mission and goals, the extent to which other facilities are dependent on the facility, and the dollar value of capital investments that have been postponed at the facility relative to the facility replacement value. A similarity factor rank orders facilities based on their Euclidean distance from Ideal and Nadir points. These similarity factors are then used to allocate capital improvement resources across facilities. We also present a parallel model that can be used to support decisions concerning allocation of human resources investments across workforce units. Finally, we present results from a pilot study where 12 experienced facility managers from NASA used D-Side and the organization's current approach to rank order and allocate funds for capital improvement across 20 facilities. Users evaluated D-Side favorably in terms of ease of use, the quality of the decision-making process, decision quality, and overall value-added. Their evaluations of D-Side were significantly more favorable than their evaluations of the current approach. Keywords: NASA, Multi-Criteria Decision Making, Decision Support System, AHP, Euclidean Distance, 3-D Modeling, Facility Planning, Workforce Planning.

  12. 33 CFR 385.16 - Design agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Design agreements. 385.16 Section... Processes § 385.16 Design agreements. (a) The Corps of Engineers shall execute a design agreement with each non-Federal sponsor for the projects of the Plan prior to initiation of design activities with that...

  13. Preliminary plan for testing a thermionic reactor in the Plum Brook Space Power Facility

    NASA Technical Reports Server (NTRS)

    Haley, F. A.

    1972-01-01

    A preliminary plan is presented for testing a thermionic reactor in the Plum Brook Space Power Facility (SPF). A technical approach, cost estimate, manpower estimate, and schedule are presented to cover a 2 year full power reactor test.

  14. 48 CFR 536.271 - Project labor agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities to be owned by a Federal department or agency. You may use a PLA in leasehold arrangement... than $5 million. Project Labor Agreement (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a...

  15. Planning School Library Media Center Facilities for New Hampshire and Vermont. Vermont Edition.

    ERIC Educational Resources Information Center

    Snider, Susan C.; Schubert, Leda

    This booklet provides guidelines and suggestions for planning school library media facilities. The intended audience is library media specialists; however, it is expected that administrators and architects may also find it useful. The importance of helping the architect understand the school media center's unique mission and relevant educational…

  16. NASA HRP Plans for Collaboration at the IBMP Ground-Based Experimental Facility (NEK)

    NASA Technical Reports Server (NTRS)

    Cromwell, Ronita L.

    2016-01-01

    NASA and IBMP are planning research collaborations using the IBMP Ground-based Experimental Facility (NEK). The NEK offers unique capabilities to study the effects of isolation on behavioral health and performance as it relates to spaceflight. The NEK is comprised of multiple interconnected modules that range in size from 50-250m(sup3). Modules can be included or excluded in a given mission allowing for flexibility of platform design. The NEK complex includes a Mission Control Center for communications and monitoring of crew members. In an effort to begin these collaborations, a 2-week mission is planned for 2017. In this mission, scientific studies will be conducted to assess facility capabilities in preparation for longer duration missions. A second follow-on 2-week mission may be planned for early in 2018. In future years, long duration missions of 4, 8 and 12 months are being considered. Missions will include scenarios that simulate for example, transit to and from asteroids, the moon, or other interplanetary travel. Mission operations will be structured to include stressors such as, high workloads, communication delays, and sleep deprivation. Studies completed at the NEK will support International Space Station expeditions, and future exploration missions. Topics studied will include communication, crew autonomy, cultural diversity, human factors, and medical capabilities.

  17. EMMA, a Recoil Mass Spectrometer for TRIUMF's ISAC-II Facility

    NASA Astrophysics Data System (ADS)

    Davids, Barry; EMMA Collaboration

    2016-09-01

    EMMA is a recoil mass spectrometer for TRIUMF's ISAC-II facility in the final stages of installation and commissioning. In this talk I will briefly review the spectrometer's design capabilities, describe recent progress in its installation and commissioning, and discuss plans for its initial experimental program. This work was supported by the Natural Sciences and Engineering Council of Canada. TRIUMF receives federal funds through a contribution agreement with the National Research Council of Canada.

  18. ADVANCED HEAT TRANSFER TEST FACILITY, TRA666A. ELEVATIONS. ROOF FRAMING PLAN. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ADVANCED HEAT TRANSFER TEST FACILITY, TRA-666A. ELEVATIONS. ROOF FRAMING PLAN. CONCRETE BLOCK SIDING. SLOPED ROOF. ROLL-UP DOOR. AIR INTAKE ENCLOSURE ON NORTH SIDE. F.C. TORKELSON 842-MTR-666-A5, 8/1966. INL INDEX NO. 531-0666-00-851-152258, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. Master Plan for Educational Facilities: West New York, Hudson County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    West New York is a city in New Jersey with a land area of 1.02 square miles and a population estimated in 1978 to be 42,500 persons. This master plan for educational facilities begins with an overview of the district and utilizes a number of maps to illustrate characteristics of the area, including its topography, relationship to key population…

  20. 48 CFR 1819.7209 - Credit agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7209 Credit agreements. (a) The credit permits the mentor to include the cost it expends on a mentor-protégé agreement as... Plan. The following provisions apply to all credit mentor-protégé agreements: (1) Developmental...

  1. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathews, S.

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less

  2. Systems Check: Community Colleges Turn to Facilities Assessments to Plan Capital Projects and Avoid Expensive Emergency Repairs

    ERIC Educational Resources Information Center

    Joch, Alan

    2014-01-01

    With an emphasis on planning and cutting costs to make better use of resources, facilities managers at community colleges across the nation have undertaken facilities audits usually with the help of outside engineers. Such assessments analyze the history and structural integrity of buildings and core components on campus, including heating…

  3. Oral healthcare access and adequacy in alternative long-term care facilities.

    PubMed

    Smith, Barbara J; Ghezzi, Elisa M; Manz, Michael C; Markova, Christiana P

    2010-01-01

    This study was undertaken to determine practices and perceived barriers to access related to oral health by surveying administrators in Michigan alternative long-term care facilities (ALTCF). A 24-item questionnaire was mailed to all 2,275 Michigan ALTCF serving residents aged 60+. Facility response rate was 22% (n = 508). Eleven percent of facilities had a written dental care plan; 18% stated a dentist examined new residents; and 19% of facilities had an agreement with a dentist to come to the facility, with 52% of those being for emergency care only. The greatest perceived barriers were willingness of general and specialty dentists to treat residents at the nursing facility and/or private offices as well as financial concerns. Substantial barriers to care were uniformly perceived. Oral health policies and practices within Michigan ALTCF vary, as measured by resources, attitudes, and the availability of professional care. There is limited involvement by dental professionals in creating policy and providing consultation and service.

  4. ARCHITECTURE FOR ADULT EDUCATION. A GRAPHIC GUIDE FOR THOSE WHO ARE PLANNING PHYSICAL FACILITIES FOR ADULT EDUCATION.

    ERIC Educational Resources Information Center

    BECKER, JOHN W.

    THIS BOOK IS DESIGNED PARTICULARLY FOR THOSE PLANNING PHYSICAL FACILITIES FOR ADULT EDUCATION. FLOOR PLANS, PHOTOGRAPHS AND DISCUSSION ARE GIVEN FOR BUILDINGS USED FOR HOSPITALS, HEALTH CENTERS, INDUSTRY, ELEMENTARY SCHOOLS, HIGH SCHOOLS, COLLEGE BUILDINGS, FINE ARTS, LIBRARIES, RECREATION COMMUNITY CENTERS, AND ADULT EDUCATION. COPIES OF THIS…

  5. 7 CFR 1415.11 - Restoration agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... restoration agreement identifies conservation practices and activities necessary to restore or improve the... to determine the terms of the restoration plan. The conservation district may assist NRCS with determining eligible conservation practices and activities and approving restoration agreements. (c) Only...

  6. 7 CFR 3550.205 - Delinquency workout agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Delinquency workout agreements. 3550.205 Section 3550... Delinquency workout agreements. Borrowers with past due accounts may be offered the opportunity to avoid liquidation by entering into a delinquency workout agreement that specifies a plan for bringing the account...

  7. 7 CFR 3550.205 - Delinquency workout agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Delinquency workout agreements. 3550.205 Section 3550... Delinquency workout agreements. Borrowers with past due accounts may be offered the opportunity to avoid liquidation by entering into a delinquency workout agreement that specifies a plan for bringing the account...

  8. 77 FR 75676 - Standard Review Plan for Review of Fuel Cycle Facility License Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0220] Standard Review Plan for Review of Fuel Cycle... Review of a License Application for a Fuel Cycle Facility.'' The NRC is extending the public comment... of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2012...

  9. 7 CFR 1290.8 - Grant agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1290.8 Section 1290.8 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... minimum the following: (1) The projects in the approved State plan. (2) Total amount of Federal financial...

  10. 7 CFR 1291.8 - Grant agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1291.8 Section 1291.8 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... minimum the following: (1) The projects in the approved State plan. (2) Total amount of Federal financial...

  11. 7 CFR 1948.98 - Grant agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Grant agreements. 1948.98 Section 1948.98 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... of this subpart is a Grant Agreement for Growth Management and Housing Planning Grants for approved...

  12. Inspired Planning

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2009-01-01

    Long-range facility planning is a comprehensive process for preparing education institutions for the future and confirm that facilities meet current needs. A long-range facilities plan (LRFP) evaluates how facilities support programs and the educational needs of students, staff and the community. Each school district or college has unique needs…

  13. 10 CFR 75.15 - Facility attachments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Facility attachments. 75.15 Section 75.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Material... under Article 39(b) of the main text of the Safeguards Agreement, do not have Facility Attachments or...

  14. 10 CFR 75.15 - Facility attachments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Facility attachments. 75.15 Section 75.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Material... under Article 39(b) of the main text of the Safeguards Agreement, do not have Facility Attachments or...

  15. Enhancing resiliency for elderly populations : Shelter-in-place planning and training at facilities serving elderly populations through the Rhode Island Senior Resiliency Project.

    PubMed

    Smith, Richard; Mozzer, Michael; Albanese, Joseph; Paturas, James; Gold, Julia

    2017-06-01

    Elderly populations are disproportionately affected by disasters. In part, this is true because for many older adults, special assistance is needed to mitigate the consequences of disasters on their health and wellbeing. In addition, many older adults may reside in diverse living complexes such as long-term care facilities, assisted living facilities and independent-living senior housing complexes. Planning for each type of facility is different and the unique features of these facilities must be considered to develop readiness to deal with disasters. Based on this, the Rhode Island Department of Health established the Senior Resiliency Project to bolster the level of resiliency for the types of living facilities housing older adults. The project involves performing onsite assessments of energy resources, developing site-specific sheltering-inplace and energy resiliency plans, and educating and training facility employees and residents on these plans and steps they can take to be better prepared. Based on the feasibility of conducting these activities within a variety of facilities housing older adults, the project is segmented into three phases. This paper describes survey findings, outcomes of interventions, challenges and recommendations for bridging gaps observed in phases 1 and 2 of the project.

  16. Meeting the contraceptive needs of teens and young adults: youth-friendly and long-acting reversible contraceptive services in U.S. family planning facilities.

    PubMed

    Kavanaugh, Megan L; Jerman, Jenna; Ethier, Kathleen; Moskosky, Susan

    2013-03-01

    Increased use of contraceptive services, including long-acting reversible contraceptives (LARCs), among sexually active teens and young adults could significantly reduce unintended pregnancy. Objectives were to describe youth-friendly contraceptive services (including LARC) available to teens and young adults at U.S. publicly funded family planning facilities. Between April and September 2011, center directors at a nationally representative sample of 1,196 U.S. publicly funded family planning facilities were surveyed to assess accessibility and provision of contraceptive services for teens and young adults; 584 (52%) responded. Facilities were accessible to young clients in several ways, including not requiring scheduled appointments for method refills (67%) and having flexible hours (64%). Most facilities provided outreach and/or education to young people (70%), and 27% used social network media to do this. Most facilities took steps to ensure confidentiality for young clients. These youth-friendly practices were more common at Planned Parenthood, Title X, and reproductive health focused facilities than at other facilities. Long-acting reversible contraceptive methods were regularly discussed with younger clients at less than half the facilities. Youth-friendly sites had increased rates of LARC provision among younger clients. The most common challenges to providing contraceptive and LARC services to younger clients were the costs of LARC methods (60%), inconvenient clinic hours (51%), staff concerns about intrauterine device (IUD) use among teens (47%), and limited training on implant insertion (47%). Improving the ability of family planning facilities to provide youth-friendly contraceptive and LARC-specific methods to younger clients may increase the use of highly effective contraception in this population. Copyright © 2013 Society for Adolescent Health and Medicine. All rights reserved.

  17. Dance Facilities.

    ERIC Educational Resources Information Center

    Ashton, Dudley, Ed.; Irey, Charlotte, Ed.

    This booklet represents an effort to assist teachers and administrators in the professional planning of dance facilities and equipment. Three chapters present the history of dance facilities, provide recommended dance facilities and equipment, and offer some adaptations of dance facilities and equipment, for elementary, secondary and college level…

  18. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  19. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Pt. 35, Subpt. I, App. B Appendix B to Subpart I of Part 35—Allowance for Facilities Planning and... initial award amount of all prime subagreements for building the project. b. The initial amounts approved...

  20. Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Stormwater Pollution Prevention Plan (SWPPP) is applicable to operations at the Technical Area -60 (TA-60) Roads and Grounds Facility and Associated Sigma Mesa Staging Area off Eniwetok Drive, in Los Alamos County, New Mexico.

  1. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    ERIC Educational Resources Information Center

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  2. 7 CFR 301.89-7 - Compliance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... such persons review with an inspector each provision of the compliance agreement, have facilities and equipment to carry out disinfestation procedures or application of chemical materials in accordance with...

  3. Measuring client satisfaction and the quality of family planning services: A comparative analysis of public and private health facilities in Tanzania, Kenya and Ghana

    PubMed Central

    2011-01-01

    Background Public and private family planning providers face different incentive structures, which may affect overall quality and ultimately the acceptability of family planning for their intended clients. This analysis seeks to quantify differences in the quality of family planning (FP) services at public and private providers in three representative sub-Saharan African countries (Tanzania, Kenya and Ghana), to assess how these quality differentials impact upon FP clients' satisfaction, and to suggest how quality improvements can improve contraceptive continuation rates. Methods Indices of technical, structural and process measures of quality are constructed from Service Provision Assessments (SPAs) conducted in Tanzania (2006), Kenya (2004) and Ghana (2002) using direct observation of facility attributes and client-provider interactions. Marginal effects from multivariate regressions controlling for client characteristics and the multi-stage cluster sample design assess the relative importance of different measures of structural and process quality at public and private facilities on client satisfaction. Results Private health facilities appear to be of higher (interpersonal) process quality than public facilities but not necessarily higher technical quality in the three countries, though these differentials are considerably larger at lower level facilities (clinics, health centers, dispensaries) than at hospitals. Family planning client satisfaction, however, appears considerably higher at private facilities - both hospitals and clinics - most likely attributable to both process and structural factors such as shorter waiting times and fewer stockouts of methods and supplies. Conclusions Because the public sector represents the major source of family planning services in developing countries, governments and Ministries of Health should continue to implement and to encourage incentives, perhaps performance-based, to improve quality at public sector health

  4. Measuring client satisfaction and the quality of family planning services: a comparative analysis of public and private health facilities in Tanzania, Kenya and Ghana.

    PubMed

    Hutchinson, Paul L; Do, Mai; Agha, Sohail

    2011-08-24

    Public and private family planning providers face different incentive structures, which may affect overall quality and ultimately the acceptability of family planning for their intended clients. This analysis seeks to quantify differences in the quality of family planning (FP) services at public and private providers in three representative sub-Saharan African countries (Tanzania, Kenya and Ghana), to assess how these quality differentials impact upon FP clients' satisfaction, and to suggest how quality improvements can improve contraceptive continuation rates. Indices of technical, structural and process measures of quality are constructed from Service Provision Assessments (SPAs) conducted in Tanzania (2006), Kenya (2004) and Ghana (2002) using direct observation of facility attributes and client-provider interactions. Marginal effects from multivariate regressions controlling for client characteristics and the multi-stage cluster sample design assess the relative importance of different measures of structural and process quality at public and private facilities on client satisfaction. Private health facilities appear to be of higher (interpersonal) process quality than public facilities but not necessarily higher technical quality in the three countries, though these differentials are considerably larger at lower level facilities (clinics, health centers, dispensaries) than at hospitals. Family planning client satisfaction, however, appears considerably higher at private facilities - both hospitals and clinics - most likely attributable to both process and structural factors such as shorter waiting times and fewer stockouts of methods and supplies. Because the public sector represents the major source of family planning services in developing countries, governments and Ministries of Health should continue to implement and to encourage incentives, perhaps performance-based, to improve quality at public sector health facilities, as well as to strengthen regulatory

  5. Marine Planning for Potential Wave Energy Facility Placement Amongst a Crowded Sea of Existing Resource Uses

    NASA Astrophysics Data System (ADS)

    Feist, B. E.; Fuller, E.; Plummer, M. L.

    2016-12-01

    Conversion to renewable energy sources is a logical response to increasing pressure to reduce greenhouse gas emissions. Ocean wave energy is the least developed renewable energy source, despite having the highest energy per unit area. While many hurdles remain in developing wave energy, assessing potential conflicts and evaluating tradeoffs with existing uses is essential. Marine planning encompasses a broad array of activities that take place in and affect large marine ecosystems, making it an ideal tool for evaluating wave energy resource use conflicts. In this study, we focus on the potential conflicts between wave energy conversion (WEC) facilities and existing marine uses in the context of marine planning, within the California Current Large Marine Ecosystem. First, we evaluated wave energy facility development using the Wave Energy Model (WEM) of the Integrated Valuation of Ecosystem Services and Trade-offs (InVEST) toolkit. Second, we ran spatial analyses on model output to identify conflicts with existing marine uses including AIS based vessel traffic, VMS and observer based measures of commercial fishing effort, and marine conservation areas. We found that regions with the highest wave energy potential were distant from major cities and that infrastructure limitations (cable landing sites) restrict integration with existing power grids. We identified multiple spatial conflicts with existing marine uses; especially shipping vessels and various commercial fishing fleets, and overlap with marine conservation areas varied by conservation designation. While wave energy generation facilities may be economically viable in the California Current, this viability must be considered within the context of the costs associated with conflicts that arise with existing marine uses. Our analyses can be used to better inform placement of WEC devices (as well as other types of renewable energy facilities) in the context of marine planning by accounting for economic tradeoffs

  6. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  7. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private wellmore » sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride

  8. Science Facilities Bibliography.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…

  9. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  10. Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans

    NASA Astrophysics Data System (ADS)

    Pogorelsky, I. V.; Ben-Zvi, I.

    2014-08-01

    The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.

  11. Studies in support of an SNM cutoff agreement: The PUREX exercise

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stanbro, W.D.; Libby, R.; Segal, J.

    1995-07-01

    On September 23, 1993, President Clinton, in a speech before the United Nations General Assembly, called for an international agreement banning the production of plutonium and highly enriched uranium for nuclear explosive purposes. A major element of any verification regime for such an agreement would probably involve inspections of reprocessing plants in Nuclear Nonproliferation Treaty weapons states. Many of these are large facilities built in the 1950s with no thought that they would be subject to international inspection. To learn about some of the problems that might be involved in the inspection of such large, old facilities, the Department ofmore » Energy, Office of Arms Control and Nonproliferation, sponsored a mock inspection exercise at the PUREX plant on the Hanford Site. This exercise examined a series of alternatives for inspections of the PUREX as a model for this type of facility at other locations. A series of conclusions were developed that can be used to guide the development of verification regimes for a cutoff agreement at reprocessing facilities.« less

  12. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  13. First-dollar cost-sharing for skilled nursing facility care in medicare advantage plans.

    PubMed

    Keohane, Laura M; Grebla, Regina C; Rahman, Momotazur; Mukamel, Dana B; Lee, Yoojin; Mor, Vincent; Trivedi, Amal

    2017-08-29

    The initial days of a Medicare-covered skilled nursing facility (SNF) stay may have no cost-sharing or daily copayments depending on beneficiaries' enrollment in traditional Medicare or Medicare Advantage. Some policymakers have advocated imposing first-dollar cost-sharing to reduce post-acute expenditures. We examined the relationship between first-dollar cost-sharing for a SNF stay and use of inpatient and SNF services. We identified seven Medicare Advantage plans that introduced daily SNF copayments of $25-$150 in 2009 or 2010. Copays began on the first day of a SNF admission. We matched these plans to seven matched control plans that did not introduce first-dollar cost-sharing. In a difference-in-differences analysis, we compared changes in SNF and inpatient utilization for the 172,958 members of intervention and control plans. In intervention plans the mean annual number of SNF days per 100 continuously enrolled inpatients decreased from 768.3 to 750.6 days when cost-sharing changes took effect. Control plans experienced a concurrent increase: 721.7 to 808.1 SNF days per 100 inpatients (adjusted difference-in-differences: -87.0 days [95% CI (-112.1,-61.9)]). In intervention plans, we observed no significant changes in the probability of any SNF service use or the number of inpatient days per hospitalized member relative to concurrent trends among control plans. Among several strategies Medicare Advantage plans can employ to moderate SNF use, first-dollar SNF cost-sharing may be one influential factor. Not applicable.

  14. Building Accountability: A Review of State Standards and Requirements for K-12 Public School Facility Planning and Design. Appendices

    ERIC Educational Resources Information Center

    Vincent, Jeffrey M.

    2016-01-01

    The purpose of this study was to inform the California Department of Education (CDE) in ensuring the standards contained in Title 5 appropriately promote the planning and design of healthy, safe and educationally suitable K-12 school facilities. The study gathers and analyzes K-12 facility standards in other states across the country to understand…

  15. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  16. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  17. San Francisco urban partnership agreement : national evaluation plan.

    DOT National Transportation Integrated Search

    2009-12-22

    This report provides an analytic framework for evaluating the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects to be evaluated focus on those r...

  18. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995more » commitments.« less

  19. NASA Wallops Flight Facility Air-Sea Interaction Research Facility

    NASA Technical Reports Server (NTRS)

    Long, Steven R.

    1992-01-01

    This publication serves as an introduction to the Air-Sea Interaction Research Facility at NASA/GSFC/Wallops Flight Facility. The purpose of this publication is to provide background information on the research facility itself, including capabilities, available instrumentation, the types of experiments already done, ongoing experiments, and future plans.

  20. Maintenance Business Plans.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  1. A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

    NASA Technical Reports Server (NTRS)

    Vairo, Daniel M.

    1998-01-01

    The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

  2. Building Accountability in California: A Review of State Standards and Requirements for K-12 Public School Facility Planning and Design

    ERIC Educational Resources Information Center

    Vincent, Jeffrey M.

    2016-01-01

    This study aims to inform the California Department of Education (CDE) in ensuring the standards contained in Title 5 appropriately promote the planning and design of healthy, safe and educationally suitable K-12 school facilities. The study gathers and analyzes K-12 facility standards in ten case study states across the country to understand…

  3. Franchise Agreements and Clean Energy: Issues in Illinois

    EPA Pesticide Factsheets

    This project evaluates the impact on energy efficiency of municipal franchise agreements that supply electricity or gas service without a direct charge (unbilled energy) for certain municipal government facilities in Illinois.)

  4. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  5. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  6. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  7. Waste receiving and processing facility module 1 data management system software project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, R.E.

    1994-11-02

    This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

  8. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  9. Stick with a School Maintenance Plan

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2012-01-01

    The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in…

  10. Education Facilities Sector-Specific Plan: An Annex to the Government Facilities Sector-Specific Plan

    ERIC Educational Resources Information Center

    US Department of Homeland Security, 2010

    2010-01-01

    Critical infrastructure and key resources (CIKR) provide the essential services that support basic elements of American society. Compromise of these CIKR could disrupt key government and industry activities, facilities, and systems, producing cascading effects throughout the Nation's economy and society and profoundly affecting the national…

  11. SU-E-T-205: Improving Quality Assurance of HDR Brachytherapy: Verifying Agreement Between Planned and Delivered Dose Distributions Using DICOM RTDose and Advanced Film Dosimetry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palmer, A L; University of Surrey, Guildford, Surrey; Bradley, D A

    Purpose: HDR brachytherapy is undergoing significant development, and quality assurance (QA) checks must keep pace. Current recommendations do not adequately verify delivered against planned dose distributions: This is particularly relevant for new treatment planning system (TPS) calculation algorithms (non TG-43 based), and an era of significant patient-specific plan optimisation. Full system checks are desirable in modern QA recommendations, complementary to device-centric individual tests. We present a QA system incorporating TPS calculation, dose distribution export, HDR unit performance, and dose distribution measurement. Such an approach, more common in external beam radiotherapy, has not previously been reported in the literature for brachytherapy.more » Methods: Our QA method was tested at 24 UK brachytherapy centres. As a novel approach, we used the TPS DICOM RTDose file export to compare planned dose distribution with that measured using Gafchromic EBT3 films placed around clinical brachytherapy treatment applicators. Gamma analysis was used to compare the dose distributions. Dose difference and distance to agreement were determined at prescription Point A. Accurate film dosimetry was achieved using a glass compression plate at scanning to ensure physically-flat films, simultaneous scanning of known dose films with measurement films, and triple-channel dosimetric analysis. Results: The mean gamma pass rate of RTDose compared to film-measured dose distributions was 98.1% at 3%(local), 2 mm criteria. The mean dose difference, measured to planned, at Point A was -0.5% for plastic treatment applicators and -2.4% for metal applicators, due to shielding not accounted for in TPS. The mean distance to agreement was 0.6 mm. Conclusion: It is recommended to develop brachytherapy QA to include full-system verification of agreement between planned and delivered dose distributions. This is a novel approach for HDR brachytherapy QA. A methodology using advanced film

  12. The planned Alaska SAR Facility - An overview

    NASA Technical Reports Server (NTRS)

    Carsey, Frank; Weeks, Wilford

    1987-01-01

    The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.

  13. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-05-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

  14. 76 FR 5394 - Notice of Proposed Information Collection for Public Comment; Memorandum of Agreement (MOA) and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... Information Collection for Public Comment; Memorandum of Agreement (MOA) and Improvement Plan (IP) in...: Title of Proposal: Memorandum of Agreement (MOA), Progress Report and Improvement Plan (IP). OMB Control... 60% is required to submit an Improvement Plan (IP). These plans are designed to address deficiencies...

  15. Proton Therapy Facility Planning From a Clinical and Operational Model.

    PubMed

    Das, Indra J; Moskvin, Vadim P; Zhao, Qingya; Cheng, Chee-Wai; Johnstone, Peter A

    2015-10-01

    This paper provides a model for planning a new proton therapy center based on clinical data, referral pattern, beam utilization and technical considerations. The patient-specific data for the depth of targets from skin in each beam angle were reviewed at our center providing megavoltage photon external beam and proton beam therapy respectively. Further, data on insurance providers, disease sites, treatment depths, snout size and the beam angle utilization from the patients treated at our proton facility were collected and analyzed for their utilization and their impact on the facility cost. The most common disease sites treated at our center are head and neck, brain, sarcoma and pediatric malignancies. From this analysis, it is shown that the tumor depth from skin surface has a bimodal distribution (peak at 12 and 26 cm) that has significant impact on the maximum proton energy, requiring the energy in the range of 130-230 MeV. The choice of beam angles also showed a distinct pattern: mainly at 90° and 270°; this indicates that the number of gantries may be minimized. Snout usage data showed that 70% of the patients are treated with 10 cm snouts. The cost of proton beam therapy depends largely on the type of machine, maximum beam energy and the choice of gantry versus fixed beam line. Our study indicates that for a 4-room center, only two gantry rooms could be needed at the present pattern of the patient cohorts, thus significantly reducing the initial capital cost. In the USA, 95% and 100% of patients can be treated with 200 and 230 MeV proton beam respectively. Use of multi-leaf collimators and pencil beam scanning may further reduce the operational cost of the facility. © The Author(s) 2014.

  16. Pena to review LHC agreement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawler, A.

    The US government plans to review its tentative agreement with Europe to help build the Large Hadron Collider (LHC), to make sure it is a good deal for this country. The review, announced last week by Energy Secretary Federico Pena, comes at the urging of Representative James Sensenbrenner (RWI), who chairs the House Science Committee. Agency officials say they are confident that most of the lawmaker`s concerns can be met with only minor changes to the proposed partnership, while European managers insist that the current agreement already addresses most of Sensenbrenner`s worries.

  17. 7 CFR 1280.624 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Facilities. 1280.624 Section 1280.624 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... INFORMATION ORDER Procedures To Request a Referendum Definitions § 1280.624 Facilities. Each county FSA office...

  18. 7 CFR 1220.620 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Facilities. 1220.620 Section 1220.620 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... CONSUMER INFORMATION Procedures To Request a Referendum Definitions § 1220.620 Facilities. Each county FSA...

  19. 24 CFR 582.315 - Occupancy agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES SHELTER PLUS CARE Program Requirements § 582.315 Occupancy...

  20. Benefits and costs of programmatic agreements

    DOT National Transportation Integrated Search

    2015-02-01

    The performing organization, on behalf of the FHWA Office of Planning, Environment, and Realty, conducted a benefit-cost assessment of programmatic agreements and approaches. The assessment consisted of a case study approach that evaluated three agre...

  1. Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  2. Withdrawing from the Paris climate agreement hurts the US

    NASA Astrophysics Data System (ADS)

    Bordoff, Jason

    2017-09-01

    The Trump administration's domestic plans would have curtailed the nation's climate action even if it had stayed in the Paris Agreement. Yet, the decision to leave the agreement undermines US international energy and climate leadership and the prospects of ramping up global climate policy ambition.

  3. Regional health care planning: a methodology to cluster facilities using community utilization patterns

    PubMed Central

    2013-01-01

    Background Community-based health care planning and regulation necessitates grouping facilities and areal units into regions of similar health care use. Limited research has explored the methodologies used in creating these regions. We offer a new methodology that clusters facilities based on similarities in patient utilization patterns and geographic location. Our case study focused on Hospital Groups in Michigan, the allocation units used for predicting future inpatient hospital bed demand in the state’s Bed Need Methodology. The scientific, practical, and political concerns that were considered throughout the formulation and development of the methodology are detailed. Methods The clustering methodology employs a 2-step K-means + Ward’s clustering algorithm to group hospitals. The final number of clusters is selected using a heuristic that integrates both a statistical-based measure of cluster fit and characteristics of the resulting Hospital Groups. Results Using recent hospital utilization data, the clustering methodology identified 33 Hospital Groups in Michigan. Conclusions Despite being developed within the politically charged climate of Certificate of Need regulation, we have provided an objective, replicable, and sustainable methodology to create Hospital Groups. Because the methodology is built upon theoretically sound principles of clustering analysis and health care service utilization, it is highly transferable across applications and suitable for grouping facilities or areal units. PMID:23964905

  4. Regional health care planning: a methodology to cluster facilities using community utilization patterns.

    PubMed

    Delamater, Paul L; Shortridge, Ashton M; Messina, Joseph P

    2013-08-22

    Community-based health care planning and regulation necessitates grouping facilities and areal units into regions of similar health care use. Limited research has explored the methodologies used in creating these regions. We offer a new methodology that clusters facilities based on similarities in patient utilization patterns and geographic location. Our case study focused on Hospital Groups in Michigan, the allocation units used for predicting future inpatient hospital bed demand in the state's Bed Need Methodology. The scientific, practical, and political concerns that were considered throughout the formulation and development of the methodology are detailed. The clustering methodology employs a 2-step K-means + Ward's clustering algorithm to group hospitals. The final number of clusters is selected using a heuristic that integrates both a statistical-based measure of cluster fit and characteristics of the resulting Hospital Groups. Using recent hospital utilization data, the clustering methodology identified 33 Hospital Groups in Michigan. Despite being developed within the politically charged climate of Certificate of Need regulation, we have provided an objective, replicable, and sustainable methodology to create Hospital Groups. Because the methodology is built upon theoretically sound principles of clustering analysis and health care service utilization, it is highly transferable across applications and suitable for grouping facilities or areal units.

  5. 7 CFR 1450.101 - Qualified biomass conversion facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Qualified biomass conversion facility. 1450.101... (BCAP) Matching Payments § 1450.101 Qualified biomass conversion facility. (a) To be considered a qualified biomass conversion facility, a biomass conversion facility must enter into an agreement with CCC...

  6. 24 CFR 201.18 - Modification agreement or repayment plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... brought current before or by the end of the loan term. A modification agreement may also be used in lieu of refinancing in connection with a loan that is current to effect a reduction in the interest rate...

  7. 24 CFR 201.18 - Modification agreement or repayment plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... brought current before or by the end of the loan term. A modification agreement may also be used in lieu of refinancing in connection with a loan that is current to effect a reduction in the interest rate...

  8. Wiltech Component Cleaning and Refurbishment Facility CFC Elimination Plan at NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Williamson, Steve; Aman, Bob; Aurigema, Andrew; Melendez, Orlando

    1999-01-01

    The Wiltech Component Cleaning & Refurbishment Facility (WT-CCRF) at NASA Kennedy Space Center performs precision cleaning on approximately 200,000 metallic and non metallic components every year. WT-CCRF has developed a CFC elimination plan consisting of aqueous cleaning and verification and an economical dual solvent strategy for alternative solvent solution. Aqueous Verification Methodologies were implemented two years ago on a variety of Ground Support Equipment (GSE) components and sampling equipment. Today, 50% of the current workload is verified using aqueous methods and 90% of the total workload is degreased aqueously using, Zonyl and Brulin surfactants in ultrasonic baths. An additional estimated 20% solvent savings could be achieved if the proposed expanded use of aqueous methods are approved. Aqueous cleaning has shown to be effective, environmentally friendly and economical (i.e.. cost of materials, equipment, facilities and labor).

  9. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  10. Life science payloads planning study integration facility survey results

    NASA Technical Reports Server (NTRS)

    Wells, G. W.; Brown, N. E.; Nelson, W. G.

    1976-01-01

    The integration facility survey effort described is structured to examine the facility resources needed to conduct life science payload (LSP) integration checkout activities at NASA-JSC. The LSP integration facility operations and functions are defined along with the LSP requirements for facility design. A description of available JSC life science facilities is presented and a comparison of accommodations versus requirements is reported.

  11. Commercial Space Port Planning in Texas

    NASA Astrophysics Data System (ADS)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones

  12. Physics Goals for the Planned Next Linear Collider Engineering Test Facility

    NASA Astrophysics Data System (ADS)

    Raubenheimer, T. O.

    2001-10-01

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well as of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.

  13. PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  14. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  15. Final work plan : investigation of potential contamination at the former CCC/USDA grain storage facility in Hanover, Kansas.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private wellmore » sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In April 2007, the CCC/USDA collected near-surface soil samples at 1.8-2 ft BGL (below ground level) at 61 locations across the former CCC/USDA facility. All soil samples were analyzed by the rigorous gas chromatograph-mass spectrometer analytical method (purge-and-trap method). No contamination was found in soil samples above the reporting limit of 10 {micro}g/kg. In July 2007, the CCC/USDA sampled indoor air at nine residences on or adjacent to its former facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. Because carbon tetrachloride found in private wells and indoor air at the site might be linked to historical use of fumigants containing carbon tetrachloride at its former grain storage facility, the CCC/USDA is proposing to conduct an investigation to determine the source and extent of the carbon tetrachloride contamination associated with the former facility. This investigation will be conducted in accordance with the intergovernmental agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. The investigation at Hanover will be performed, on behalf of the CCC/USDA, by the Environmental

  16. Music Facilities.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    The layouts and specifications in this booklet are intended to assist those involved in planning music facilities for elementary and secondary schools. Drawings, room plans, and text illustrate specifications for location; space relationship; combined and separate instrumental and vocal rooms; practice rooms; and auxiliary areas. Particular…

  17. The Benefits of Incorporating Shipping Containers into the Climate Change Adaption Plans at NASA Wallops Flight Facility

    NASA Technical Reports Server (NTRS)

    Hamilton, Carl Kenneth Gonzaga

    2017-01-01

    The National Aeronautics and Space Administration has several centers and facilities located near the coast that are undoubtedly susceptible to climate change. One of those facilities is Wallops Flight Facility on the Eastern Shore of Virginia which is separated into three areas: Main Base, Mainland, and the Island. Wallops Island has numerous buildings and assets that are vulnerable to flood inundation, intense storms, and storm surge. The shoreline of Wallops Island is prone to beach erosion and is slated for another beach replenishment project in 2019. In addition, current climate projections for NASAs centers and facilities, conducted by the Climate Adaptation Science Investigators, warn of inevitable increases in annual temperature, precipitation, sea level rise, and extreme events such as heat waves. The aforementioned vulnerabilities Wallops Island faces in addition to the projections of future climate change reveal an urgency for NASA to adjust how new buildings at its centers and facilities near the coast are built to adapt to the inevitable effects of climate change. Although the agency has made strides to mitigate the effects of climate change by incorporating L.E.E.D. into new buildings that produce less greenhouse gas, the strides for the agency to institute clear climate adaptation policies for the buildings at its centers and facilities near the coast seem to lag behind. As NASA continues to formulate formidable climate change adaptation plans for its centers and facilities, an architectural trend that should be examined for its potential to replace several old buildings at Wallops Island is shipping containers buildings. Shipping containers or Intermodal Steel Building Units offer an array of benefits such as strength, durability, versatility, modular, and since they can be upcycled, they are also eco-friendly. Some disadvantages of shipping containers are they contain harmful chemicals, insulation must be added, fossil fuels must be used to

  18. Some new astronomical facilities in China

    NASA Astrophysics Data System (ADS)

    Wang, Shouguan

    1989-10-01

    For the 1990's, plans for some astronomical facilities and related research are being carried out in China. This report describes in some detail plans for radio astronomical facilities, a 150/220 cm Schmidt telescope, and experiments on a porcelain mirror material.

  19. Status of the FLARE (Facility for Laboratory Reconnection Experiments) Construction Project and Plans as a User Facility

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.

    2016-10-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.

  20. Hydrazine Blending and Storage Facility, Wastewater Treatment and Decommissioning Assessment. Technical Plan, Version 3.2

    DTIC Science & Technology

    1988-04-01

    o CHEMICAL TREATMENT - CHLORINE (VARIOUS FORMS) AND CHLORINE/ULTRAVIOLET LIGHT (UV) - OZONE AND OZONE/UV - PERMANGANATE - HYDROGEN PEROXIDE AND...and placed in drums, rail cars or trucks (Hazard 3 Abatement Plan, 1982). The existing hydrazine blending facility area is a limited access site which...Area 40’-0" x 26’-0" Volume 44,000 gallons Function Receive wastewater and stormwater runoff m Construction Material Concrete 7. Building 759 Size 40’-0

  1. A Guide for Planning Facilities for Occupational Preparation Programs in the Machine Trades. Interim Report. Research 24.

    ERIC Educational Resources Information Center

    Larson, Milton E.

    This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…

  2. Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs, Raymer J.E.

    2008-06-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets

  3. 40 CFR 62.5100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Maryland Plan for Control... plan. (a) Identification of plan. Maryland Plan for Control Designated Pollutants from Existing Facilities (Section 111(d) plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric...

  4. 40 CFR 62.10100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...

  5. Planning for the recreational end use of a future LLR waste mound in Canada - Leaving an honourable legacy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kleb, H.R.; Zelmer, R.L.

    2007-07-01

    The Low-Level Radioactive Waste Management Office was established in 1982 to carry out the federal government's responsibilities for low-level radioactive (LLR) waste management in Canada. In this capacity, the Office operates programs to characterize, delineate, decontaminate and consolidate historic LLR waste for interim and long-term storage. The Office is currently the proponent of the Port Hope Area Initiative; a program directed at the development and implementation of a safe, local long-term management solution for historic LLR waste in the Port Hope area. A legal agreement between the Government of Canada and the host community provides the framework for the implementationmore » of the Port Hope Project. Specifically, the agreement requires that the surface of the long-term LLR waste management facility be 'conducive to passive and active recreational uses such as soccer fields and baseball diamonds'. However, there are currently no examples of licensed LLR waste management facilities in Canada that permit recreational use. Such an end use presents challenges with respect to engineering and design, health and safety and landscape planning. This paper presents the cover system design, the environmental effects assessment and the landscape planning processes that were undertaken in support of the recreational end use of the Port Hope long-term LLR waste management facility. (authors)« less

  6. Manufacturing Planning Guide

    NASA Technical Reports Server (NTRS)

    Waid, Michael

    2011-01-01

    Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Florida Educational Facilities, 1996.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1996. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  8. Florida Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1997. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  9. Florida Educational Facilities, 1998.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1998. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  10. 40 CFR 62.8350 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS North Carolina Plan for... Identification of plan. (a) Identification of plan. North Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Control of sulfuric acid mist emissions from...

  11. Physics Goals for the Planned Next Linear Collider Engineering Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raubenheimer, Tor O

    2001-10-02

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less

  12. Physics goals for the planned next linear collider engineering test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Courtlandt L Bohn et al.

    2001-06-26

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less

  13. Physics goals for the planned next linear collider engineering test facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bohn, C.; Michelotti, L.; Ostiguy, J.-F.

    2001-07-17

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less

  14. ATR National Scientific User Facility 2009 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Todd R. Allen; Mitchell K. Meyer; Frances Marshall

    2010-11-01

    This report describes activities of the ATR NSUF from FY-2008 through FY-2009 and includes information on partner facilities, calls for proposals, users week and education programs. The report also contains project information on university research projects that were awarded by ATR NSUF in the fiscal years 2008 & 2009. This research is university-proposed researcher under a user facility agreement. All intellectual property from these experiments belongs to the university per the user agreement.

  15. 7 CFR 1956.142 - Delinquent adjustment agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contact the debtor promptly to determine the reason for the delinquency and the debtor's plan for completing the agreement. (b) Delinquencies of 30 days or more will be reported to the State Director along...

  16. 10 CFR 61.32 - Facility information and verification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WASTE Licenses Us/iaea Safeguards Agreement § 61.32 Facility information and verification. (a) In... as necessary to implement the US/IAEA Safeguards Agreement, as described in Part 75 of this chapter...

  17. Science Facilities for Mississippi Schools, Grades 1-12.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Div. of Instruction.

    Prepared to assist those planning the construction of new science facilities on the elementary, intermediate, or secondary school level. Standards are outlined and specifications detailed. A statement of fifteen general pricniples for planning science facilities in secondary schools precedes a discussion of--(1) special facilities for different…

  18. Test Plan for the Wake Steering Experiment at the Scaled Wind Farm Technology (SWiFT) Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naughton, Brian Thomas

    This document is a test plan describing the objectives, configuration, procedures, reporting, roles, and responsibilities for conducting the joint Sandia National Laboratories and National Renewable Energy Laboratory Wake Steering Experiment at the Sandia Scaled Wind Farm Technology (SWiFT) facility near Lubbock, Texas in 2016 and 2017 . The purpose of this document is to ensure the test objectives and procedures are sufficiently detailed such that al l involved personnel are able to contribute to the technical success of the test. This document is not intended to address safety explicitly which is addressed in a separate document listed in the referencesmore » titled Sandia SWiFT Facility Site Operations Manual . Both documents should be reviewed by all test personnel.« less

  19. Quality Assessment of Family Planning Sterilization Services at Health Care Facilities: Case Record Audit.

    PubMed

    Mathur, Medha; Goyal, Ram Chandra; Mathur, Navgeet

    2017-05-01

    Quality of sterilization services is a matter of concern in India because population control is a necessity. Family Planning Sterilization (FPS) services provided at public health care facilities need to be as per Standard Operating Procedures. To assess the quality of FPS services by audit of case records at selected health care facilities. This cross-sectional study was conducted for two and a half year duration at selected public health care facilities of central India by simple random sampling where FPS services were provided. As per the standards of Government of India, case records were audited and compliance was calculated to assess the quality of services. Results of record audit were satisfactory but important criteria like previous contraceptive history and postoperative counselling were found to be deviated from standards. At Primary Health Centres (PHCs) only 89.5% and at Community Health Centres (CHCs) 58.7% of records were having details of previous contraceptive history. Other criteria like mental illness (only 70% at CHCs) assessment were also inadequate. Although informed consent was found to be having 100% compliance in all records. Quality of care in FPS services is the matter of concern in present scenario for better quality of services. This study may enlighten the policy makers regarding improvements needed for providing quality care.

  20. Steps to a HealthierUS Cooperative Agreement Program: foundational elements for program evaluation planning, implementation, and use of findings.

    PubMed

    MacDonald, Goldie; Garcia, Danyael; Zaza, Stephanie; Schooley, Michael; Compton, Don; Bryant, Terry; Bagnol, Lulu; Edgerly, Cathy; Haverkate, Rick

    2006-01-01

    The Steps to a HealthierUS Cooperative Agreement Program (Steps Program) enables funded communities to implement chronic disease prevention and health promotion efforts to reduce the burden of diabetes, obesity, asthma, and related risk factors. At both the national and community levels, investment in surveillance and program evaluation is substantial. Public health practitioners engaged in program evaluation planning often identify desired outcomes, related indicators, and data collection methods but may pay only limited attention to an overarching vision for program evaluation among participating sites. We developed a set of foundational elements to provide a vision of program evaluation that informs the technical decisions made throughout the evaluation process. Given the diversity of activities across the Steps Program and the need for coordination between national- and community-level evaluation efforts, our recommendations to guide program evaluation practice are explicit yet leave room for site-specific context and needs. Staff across the Steps Program must consider these foundational elements to prepare a formal plan for program evaluation. Attention to each element moves the Steps Program closer to well-designed and complementary plans for program evaluation at the national, state, and community levels.

  1. Instructional Television Facilities: A Planning Guide.

    ERIC Educational Resources Information Center

    Witherspoon, John P.; Kessler, William J.

    When planning an instructional television (ITV) system, it is suggested that educational objectives should outweigh technological considerations and that expert advice be secured before the planning process is far advanced. In line with the latter suggestion, the book offers a background of technical knowledge aimed at educational administrators…

  2. Kauai Test Facility hazards assessment document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swihart, A

    1995-05-01

    The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility`s chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to themore » Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the {open_quotes}Main Complex{close_quotes} and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the {open_quotes}Main Complex{close_quotes} is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility`s site boundary.« less

  3. Innovative Capital Planning

    ERIC Educational Resources Information Center

    McIntyre, Chuck

    2003-01-01

    Community college strategic planning is becoming more learning-centered, grounded in the student experience, and open to change. As a result, facility planners are challenged to embody these notions in a college's strategic delivery plan: the systems and facilities needed to accomplish its mission and vision. This article proposes a new process…

  4. Life Sciences Space Station planning document: A reference payload for the Life Sciences Research Facility

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Space Station, projected for construction in the early 1990s, will be an orbiting, low-gravity, permanently manned facility providing unprecedented opportunities for scientific research. Facilities for Life Sciences research will include a pressurized research laboratory, attached payloads, and platforms which will allow investigators to perform experiments in the crucial areas of Space Medicine, Space Biology, Exobiology, Biospherics and Controlled Ecological Life Support System (CELSS). These studies are designed to determine the consequences of long-term exposure to space conditions, with particular emphasis on assuring the permanent presence of humans in space. The applied and basic research to be performed, using humans, animals, and plants, will increase our understanding of the effects of the space environment on basic life processes. Facilities being planned for remote observations from platforms and attached payloads of biologically important elements and compounds in space and on other planets (Exobiology) will permit exploration of the relationship between the evolution of life and the universe. Space-based, global scale observations of terrestrial biology (Biospherics) will provide data critical for understanding and ultimately managing changes in the Earth's ecosystem. The life sciences community is encouraged to participate in the research potential the Space Station facilities will make possible. This document provides the range and scope of typical life sciences experiments which could be performed within a pressurized laboratory module on Space Station.

  5. Long-acting family planning method switching among revisit clients of public health facilities in Dire Dawa, Ethiopia.

    PubMed

    Atnafe, Meselu; Assefa, Nega; Alemayehu, Tadesse

    2016-01-01

    "Contraceptive switching" from one method to another is a common phenomenon. Switching from a more effective long-acting method to a less effective method exposes women for unplanned pregnancy. The aim of this study was to assess the level and factors associated with long-acting family planning method switching to other methods. A facility-based cross-sectional study was conducted from January to March 2013 on 634 women attending public health facilities in Dire Dawa City Administration, Ethiopia. Participants of the study were revisit clients of family planning service and were interviewed as they appear in the clinics. Data were analyzed using crude and adjusted logistic regression, and results were reported using OR and corresponding 95 % CI. Long-acting family planning method switching among revisit clients was 40.4 %; switching from implant was 29.8 % and from IUCD, it was 10.6 %. The main reasons for methods switching were side effects of the methods such as bleeding, weight loss, and feeling of arm numbness. The tendency of switching was less among married women (AOR = 2.41, 95 % CI: 1.01, 5.74), women who had 2-4 and 5 and more children (AOR 3.00, 95 % CI: 1.59, 5.67) and (AOR 2.07, 95 % CI: 1.17, 3.66), respectively. It was also less among women who want to stop birth (AOR 5.11, 95 % CI: 1.15, 24.8), among those who mentioned health care providers as source of information for family planning (AOR 1.88, 95 % CI: 1.18, 3.01), and among women whose husbands were aware of their use of the methods (AOR 3.05, 95 % CI: 1.88, 4.94). Method switching from long-acting contraceptives to less effective methods is high. Method switching was significant among unmarried women, who had one child, plan to postpone fertility, and whose husbands were not aware of their wive's use of the method. In the provision of family planning service, the health care providers should give adequate information about each method and risks of method switching. Appropriate family

  6. Effects of Caps on Cost Sharing for Skilled Nursing Facility Services in Medicare Advantage Plans.

    PubMed

    Keohane, Laura M; Rahman, Momotazur; Thomas, Kali S; Trivedi, Amal N

    2018-03-12

    To evaluate a federal regulation effective in 2011 that limited how much that Medicare Advantage (MA) plans could charge for the first 20 days of care in a skilled nursing facility (SNF). Difference-in-differences retrospective analysis comparing SNF utilization trends from 2008-2012. Select MA plans. Members of 27 plans with mandatory cost sharing reductions (n=132,000) and members of 21 plans without such reductions (n=138,846). Mean monthly number of SNF admissions and days per 1,000 members; annual proportion of MA enrollees exiting the plan. In plans with mandated cost sharing reductions, cost sharing for the first 20 days of SNF care decreased from an average of $2,039 in 2010 to $992 in 2011. In adjusted analyses, plans with mandated cost-sharing reductions averaged 158.1 SNF days (95% confidence interval (CI)=153.2-163.1 days) per 1,000 members per month before the cost sharing cap. This measure increased by 14.3 days (95% CI=3.8-24.8 days, p=0.009) in the 2 years after cap implementation. However, increases in SNF utilization did not significantly differ between plans with and without mandated cost-sharing reductions (adjusted between-group difference: 7.1 days per 1,000 members, 95% CI=-6.5-20.8, p=.30). Disenrollment patterns did not change after the cap took effect. When a federal regulation designed to protect MA members from high out-of-pocket costs for postacute care took effect, the use of SNF services did not change. © 2018, Copyright the Authors Journal compilation © 2018, The American Geriatrics Society.

  7. Planning considerations for a Mars Sample Receiving Facility: summary and interpretation of three design studies.

    PubMed

    Beaty, David W; Allen, Carlton C; Bass, Deborah S; Buxbaum, Karen L; Campbell, James K; Lindstrom, David J; Miller, Sylvia L; Papanastassiou, Dimitri A

    2009-10-01

    It has been widely understood for many years that an essential component of a Mars Sample Return mission is a Sample Receiving Facility (SRF). The purpose of such a facility would be to take delivery of the flight hardware that lands on Earth, open the spacecraft and extract the sample container and samples, and conduct an agreed-upon test protocol, while ensuring strict containment and contamination control of the samples while in the SRF. Any samples that are found to be non-hazardous (or are rendered non-hazardous by sterilization) would then be transferred to long-term curation. Although the general concept of an SRF is relatively straightforward, there has been considerable discussion about implementation planning. The Mars Exploration Program carried out an analysis of the attributes of an SRF to establish its scope, including minimum size and functionality, budgetary requirements (capital cost, operating costs, cost profile), and development schedule. The approach was to arrange for three independent design studies, each led by an architectural design firm, and compare the results. While there were many design elements in common identified by each study team, there were significant differences in the way human operators were to interact with the systems. In aggregate, the design studies provided insight into the attributes of a future SRF and the complex factors to consider for future programmatic planning.

  8. Planning Considerations for a Mars Sample Receiving Facility: Summary and Interpretation of Three Design Studies

    NASA Astrophysics Data System (ADS)

    Beaty, David W.; Allen, Carlton C.; Bass, Deborah S.; Buxbaum, Karen L.; Campbell, James K.; Lindstrom, David J.; Miller, Sylvia L.; Papanastassiou, Dimitri A.

    2009-10-01

    It has been widely understood for many years that an essential component of a Mars Sample Return mission is a Sample Receiving Facility (SRF). The purpose of such a facility would be to take delivery of the flight hardware that lands on Earth, open the spacecraft and extract the sample container and samples, and conduct an agreed-upon test protocol, while ensuring strict containment and contamination control of the samples while in the SRF. Any samples that are found to be non-hazardous (or are rendered non-hazardous by sterilization) would then be transferred to long-term curation. Although the general concept of an SRF is relatively straightforward, there has been considerable discussion about implementation planning. The Mars Exploration Program carried out an analysis of the attributes of an SRF to establish its scope, including minimum size and functionality, budgetary requirements (capital cost, operating costs, cost profile), and development schedule. The approach was to arrange for three independent design studies, each led by an architectural design firm, and compare the results. While there were many design elements in common identified by each study team, there were significant differences in the way human operators were to interact with the systems. In aggregate, the design studies provided insight into the attributes of a future SRF and the complex factors to consider for future programmatic planning.

  9. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  10. 78 FR 11688 - Notice of Issuance of Amendment to Facility License R-77 Incorporating a Decommissioning Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Reactor at the State University of New York at Buffalo AGENCY: Nuclear Regulatory Commission. ACTION... University of New York at Buffalo (UB) decommissioning plan (DP) by amendment to the Facility License R-77... in the NRC Library at http://www.nrc.gov/reading-rm/adams.html . To begin the search, select ``ADAMS...

  11. Agreements/subagreements Applicable to Wallops, 12 Nov. 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The status of space science agreements are noted. A general overview of the Wallops Flight Facility (WFF) is given. The geography, history, and mission of the facility are briefly surveyed. Brief accounts are given of NASA earth science activities at the WFF, including atmospheric dynamics, atmospheric optics, ocean physics, microwave altimetry, ocean color research, wind-wave-current interaction, flight support activities, the Sounding Rocket Program, and the NASA Balloon Program. Also discussed are the WFF launch range, the research airport, aircraft airborne science, telemetry, data systems, communications, and command and control.

  12. FAST FLUX TEST FACILITY CONCEPTUAL FACILTY DESIGN DESCRIPTION FOR THE INERT GAS CELL EXAMINATION FACILITY NO. 71

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1968-12-12

    The purpose of this Conceptual Facility Design Description (CFDD) is to provide a technical description of the Inert Gas Cell Examination Facility such that agreement with RDT on a Conceptual Design can be reached . The CFDD also serves to establish a common understanding of the facility concept among all responsible FFTF Project parties including the Architect Engineer and Reactor Designer. Included are functions and design requirements, a physical description of the facility, safety considerations, principles of operation, and maintenance principles.

  13. Facility Design Considerations.

    ERIC Educational Resources Information Center

    Chase, William W.

    1967-01-01

    Increasing need for vocational education under the impetus of federal aid is generating a demand for vocational teaching facilities. Factors to be considered in planning these facilities inclued--(1) site development, (2) program needs, (3) administrative considerations, (4) environmental controls. (5) mechanical systems, and (6) area and space…

  14. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  15. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  16. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  17. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  18. 40 CFR 62.1100 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS California Plan for the... of plan. (a) State of California Designated Facility Plan (Section 111(d) Plan). (b) The plan was... Pollution Control District Regulation 1; Rule 130—Definitions, Rule 240—Permit to Operate, Rule 450—Sulfide...

  19. Research, Development & Dissemination in Educational Planning & Educational Facilities Planning. Project SIMU-School.

    ERIC Educational Resources Information Center

    Hunt, Lester W.; Burr, Donald F.

    The Simu-School Program and the National Center for Educational Planning were conceived because of the need for (1) expertise in educational planning, (2) a system to collect and assemble the vast amount of knowledge concerning education, (3) community involvement in planning, and (4) a system to accurately interpret today's data in planning for…

  20. Facility Response Planning: Compliance Assistance Guide

    EPA Pesticide Factsheets

    This guide was developed in order to help owners and operators of facilities that store or use oil, as well as other interested people, to better understand the Federal Oil Pollution Prevention regulation.

  1. Observer Agreement for Measurements in Videolaryngostroboscopy.

    PubMed

    Brunings, Jan Wouter; Vanbelle, Sophie; Akkermans, Annemarie; Heemskerk, Nienke M M; Kremer, Bernd; Stokroos, Robert J; Baijens, Laura W J

    2017-11-06

    This study evaluated the levels of intraobserver and interobserver agreement for measurements of visuoperceptual variables in videolaryngostroboscopic examinations and compared the observers' behavior during independent versus consensus panel rating. This is a retrospective study. This study was conducted in a single-center tertiary care facility. Sixty-four patients with dysphonia of heterogeneous etiology were included. All subjects underwent a standardized videolaryngostroboscopic examination. Two experienced and trained observers scored exactly the same examinations, first independently and then on a consensus panel. Specific visuoperceptual variables and the clinical diagnosis (as recommended by the Committee on Phoniatrics and the Phonosurgery Committee of the European Laryngological Society and advised by the American Speech-Language-Hearing Association) were scored. Descriptive and kappa statistics were used. In general, intraobserver agreement was better than agreement between observers for measurements of several variables. The intrapanel observer agreement levels were slightly higher than the intraobserver agreement levels on the independent rating task. When rating on the consensus panel, the observers deviated considerably from the scores they had previously given on the independent rating task. Observer agreement in videolaryngostroboscopic assessment has important implications not only for the diagnosis and treatment of dysphonic patients but also for the interpretation of the results of scientific studies using videolaryngostroboscopic outcome parameters. The identification of factors that can influence the levels of observer agreement can provide a better understanding of the rating process and its limitations. The results of this study suggest that future research could achieve better agreement levels by rating the visuoperceptual variables in a panel setting. Copyright © 2017 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  2. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  3. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  4. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  5. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  6. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  7. A facility birth can be the time to start family planning: postpartum intrauterine device experiences from six countries.

    PubMed

    Pfitzer, Anne; Mackenzie, Devon; Blanchard, Holly; Hyjazi, Yolande; Kumar, Somesh; Lisanework Kassa, Serawit; Marinduque, Bernabe; Mateo, Marie Grace; Mukarugwiro, Beata; Ngabo, Fidele; Zaeem, Shabana; Zafar, Zonobia; Smith, Jeffrey Michael

    2015-06-01

    Initiation of family planning at the time of birth is opportune, since few women in low-resource settings who give birth in a facility return for further care. Postpartum family planning (PPFP) and postpartum intrauterine device (PPIUD) services were integrated into maternal care in six low- and middle-income countries, applying an insertion technique developed in Paraguay. Facilities with high delivery volume were selected to integrate PPFP/PPIUD services into routine care. Effective PPFP/PPIUD integration requires training and mentoring those providers assisting women at the time of birth. Ongoing monitoring generated data for advocacy. The percentages of PPIUD acceptors ranged from 2.3% of women counseled in Pakistan to 5.8% in the Philippines. Rates of complications among women returning for follow-up were low. Expulsion rates were 3.7% in Pakistan, 3.6% in Ethiopia, and 1.7% in Guinea and the Philippines. Infection rates did not exceed 1.3%, and three countries recorded no cases. Offering PPFP/PPIUD at birth improves access to contraception. Copyright © 2015. Published by Elsevier Ireland Ltd.

  8. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  9. Final work plan : phase II investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of statewide screening of private wells near former CCC/USDA facilities, conducted in Missouri by themore » U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]) described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the Missouri risk-based corrective action default target level (MRBCA DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service

  10. 39 CFR 3010.42 - Contents of notice of agreement in support of a negotiated service agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... agreement. (a) Whenever the Postal Service proposes to establish or change rates or fees and/or the Mail... public notice of the planned changes has been issued or will be issued at least 45 days before the... position or operations of the Postal Service. The projection of change in net financial position as a...

  11. 7 CFR 625.9 - 10-year restoration cost-share agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false 10-year restoration cost-share agreements. 625.9... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES HEALTHY FORESTS RESERVE PROGRAM § 625.9 10-year restoration cost-share agreements. (a) The restoration plan developed under § 625.12 forms the basis for the...

  12. National facilities study. Volume 5: Space research and development facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R

  13. 42 CFR 442.13 - Effective date of provider agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Effective date of provider agreement. 442.13 Section 442.13 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS STANDARDS FOR PAYMENT TO NURSING FACILITIES AND...

  14. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1988-01-25

    These final regulations provide States options under which an intermediate care facility for the mentally retarded (ICF/MR) found to have substantial deficiencies only in physical plant and staffing (or physical plant, staffing, and other minor deficiencies) that do not pose an immediate threat to the clients' health and safety may remedy those deficiencies. The regulations provide the State Medicaid agency with options to submit written plans either to correct the necessary staff and physical plant deficiencies, and all other minor deficiencies, within 6 months of the approval date of the plan, or to reduce permanently the number of beds in certified units within 36 months of the approval date of the plan. These regulations implement section 9516 of the Consolidated Omnibus Budget Reconciliation Act of 1985 and section 4217 of the Omnibus Budget Reconciliation Act of 1987. The purpose of the correction plan provision is to promote correction of deficiencies without having to exclude ICFs/MR from the Medicaid program. The reduction plan provision is intended to move Medicaid clients out of deficient ICFs/MR into licensed or certified (as applicable) community settings while maintaining the clients' quality of life and retaining their Medicaid eligibility.

  15. 39 CFR 3010.43 - Data collection plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Data collection plan. 3010.43 Section 3010.43... collection plan. The Postal Service shall include with any notice of agreement a detailed plan for providing data or information on actual experience under the agreement sufficient to allow evaluation of whether...

  16. 78 FR 35319 - Solicitation for a Cooperative Agreement-Curriculum Development: Planning and Implementing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... DEPARTMENT OF JUSTICE National Institute of Corrections Solicitation for a Cooperative Agreement... Institute of Corrections, U.S. Department of Justice. ACTION: Solicitation for a Cooperative Agreement.... Eligibility of Applicants: An eligible applicant is any public or private agency, educational institution...

  17. Florida Educational Facilities, 1999.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This publication describes Florida school and community college facilities completed in 1999, including photographs and floor plans. The facilities profiled are: Buchholz High School (Alachua County); Gator Run Elementary School (Broward); Corkscrew Elementary School (Collier); The 500 Role Models Academy of Excellence (Miami-Dade); Caribbean…

  18. Florida Educational Facilities, 2000.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This publication describes Florida school and community college facilities completed in 2000, including photographs and floor plans. The facilities profiled are:J. R. Arnold High School (Bay County); Falcon Cove Middle School (Broward); Floranada Elementary School (Broward); Lyons Creek Middle School (Broward); Parkside Elementary School…

  19. 24 CFR 570.503 - Agreements with subrecipients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Agreements with subrecipients. 570.503 Section 570.503 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF...

  20. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... include new and existing small-scale wind energy facilities, such as single-turbine demonstration projects, as well as large, multi-turbine commercial wind facilities. Covered Species The planning partners are...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

  1. Plans for the development of EOS SAR systems using the Alaska SAR facility. [Earth Observing System (EOS)

    NASA Technical Reports Server (NTRS)

    Carsey, F. D.; Weeks, W.

    1988-01-01

    The Alaska SAR Facility (ASF) program for the acquisition and processing of data from the ESA ERS-1, the NASDA ERS-1, and Radarsat and to carry out a program of science investigations using the data is introduced. Agreements for data acquisition and analysis are in place except for the agreement between NASA and Radarsat which is in negotiation. The ASF baseline system, consisting of the Receiving Ground System, the SAR Processor System and the Archive and Operations System, passed critical design review and is fully in implementation phase. Augments to the baseline system for systems to perform geophysical processing and for processing of J-ERS-1 optical data are in the design and implementation phase. The ASF provides a very effective vehicle with which to prepare for the Earth Observing System (EOS) in that it will aid the development of systems and technologies for handling the data volumes produced by the systems of the next decades, and it will also supply some of the data types that will be produced by EOS.

  2. Conceptual design of the National Ignition Facility

    NASA Astrophysics Data System (ADS)

    Paisner, Jeffrey A.; Boyes, John D.; Kumpan, Steven A.; Lowdermilk, W. Howard; Sorem, Michael S.

    1995-12-01

    The Secretary of the U.S. Department of Energy (DOE) commissioned a conceptual design report (CDR) for the National Ignition Facility (NIF) in January 1993 as part of a key decision zero (KD0), justification of mission need. Motivated by the progress to date by the inertial confinement fusion (ICF) program in meeting the Nova technical contract goals established by the National Academy of Sciences in 1989, the Secretary requested a design using a solid-state laser driver operating at the third harmonic (0.35 micrometer) of neodymium (Nd) glass. The participating ICF laboratories signed a memorandum of agreement in August 1993, and established a project organization, including a technical team from the Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Laboratory for Laser Energetics at the University of Rochester. Since then, we completed the NIF conceptual design, based on standard construction at a generic DOE defense program's site, and issued a 7,000-page, 27-volume CDR in May 1994. Over the course of the conceptual design study, several other key documents were generated, including a facilities requirements document, a conceptual design scope and plan, a target physics design document, a laser design cost basis document, a functional requirements document, an experimental plan for indirect drive ignition, and a preliminary hazards analysis (PHA) document. DOE used the PHA to categorize the NIF as a low-hazard, non-nuclear facility. On October 21, 1994 the Secretary of Energy issued a key decision one (KD1) for the NIF, which approved the project and authorized DOE to request Office of Management and Budget-approval for congressional line-item FY 1996 NIF funding for preliminary engineering design and for National Environmental Policy Act activities. In addition, the Secretary declared Livermore as the preferred site for constructing the NIF. In February 1995, the NIF Project was

  3. 32 CFR 644.137 - Maneuver agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planning and acquires rights to use land and other facilities for Department of the Army exercises. The... and, after the maneuver is completed, will be responsible for negotiating restoration settlements and... director at field level whereby the command will assume responsibility for settlement of real estate...

  4. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while... 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative...

  5. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while... 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative...

  6. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while... 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative...

  7. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., the selected alternative is cost effective (i.e., is the most economical means of meeting the applicable effluent, water quality and public health requirements over the design life of the facility while... 10,000 or less, consideration must be given to appropriate low cost technologies such as facultative...

  8. 42 CFR 442.12 - Provider agreement: General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Provider agreement: General requirements. 442.12... under subpart C of this part for ICFs/IID or subpart E of part 488 of this chapter for NFs. (d) Denial... agency, if the facility fails to meet the civil rights requirements set forth in 45 CFR parts 80, 84, and...

  9. 42 CFR 442.12 - Provider agreement: General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Provider agreement: General requirements. 442.12... under subpart C of this part for ICFs/IID or subpart E of part 488 of this chapter for NFs. (d) Denial... agency, if the facility fails to meet the civil rights requirements set forth in 45 CFR parts 80, 84, and...

  10. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  11. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan must be designed to operate in the conditions expected in the facility's geographic area. These... handling, storing, or transporting oil in more than one operating environment as indicated in Table 1 of... § 154.106), or other tests approved by the Coast Guard. 2.4Table 1 of this appendix lists criteria for...

  12. TO BUILD OR NOT TO BUILD, A REPORT ON THE UTILIZATION AND PLANNING OF INSTRUCTIONAL FACILITIES IN SMALL COLLEGES.

    ERIC Educational Resources Information Center

    JAMRICH, JOHN X.

    A SOLUTION TO PROBLEMS OF GROWING COLLEGE ENROLLMENTS IS TO INCREASE THE EFFICIENCY OF USE OF EXISTING SPACE TO MAKE ROOM FOR MORE STUDENTS, RATHER THAN TO RESTRICT ENROLLMENTS OR TO CREATE MORE SPACE. PLANNING OF COLLEGE FACILITIES MUST INCLUDE ANALYSIS OF THE PRESENT PLANT, THE INSTRUCTIONAL PROGRAM, THE STUDENT BODY, AND THE FINANCIAL…

  13. Systems test facilities existing capabilities compilation

    NASA Technical Reports Server (NTRS)

    Weaver, R.

    1981-01-01

    Systems test facilities (STFS) to test total photovoltaic systems and their interfaces are described. The systems development (SD) plan is compilation of existing and planned STFs, as well as subsystem and key component testing facilities. It is recommended that the existing capabilities compilation is annually updated to provide and assessment of the STF activity and to disseminate STF capabilities, status and availability to the photovoltaics program.

  14. Use of Product Listing Agreements by Canadian Provincial Drug Benefit Plans

    PubMed Central

    Friesen, Melissa K.; Thomson, Paige A.; Daw, Jamie R.

    2013-01-01

    Background: Product listing agreements (PLAs) between drug manufacturers and drug plans are increasingly common worldwide. Use of PLAs by Canadian provinces has not previously been documented. Methods: We collected data from all provinces on funding and PLA use for 25 drugs that were reviewed by the Common Drug Review (CDR) in 2010 or 2011 and funded by at least one province as of May 2012. We measured correlations between coverage and PLA use, and CDR recommendations and PLA use. Results: The number of drugs from our sample funded by provinces ranged from three in Prince Edward Island to 21 in Ontario. PLA use ranged from zero in Quebec, Prince Edward Island, and Newfoundland and Labrador to 20 in Ontario. The correlation between drugs funded and PLAs used by each province was statistically significant (r=0.57, p=0.04); excluding Ontario, however, the correlation was not significant (r=0.10, p=0.40). There was a stronger correlation between the number of provinces funding a drug and the number using PLAs among the subset of drugs with negative CDR recommendations (r=0.87, p<0.01) versus those with positive recommendations (r=0.52, p=0.03). Of the 12 drugs sampled with a negative CDR recommendation, 10 were funded with a PLA in at least one province. Interpretation: There is wide interprovincial variation in PLA use and evidence that PLAs may be used to fund drugs that are not otherwise cost-effective. If global pricing strategies are making PLAs necessary, Canadian governments should collaborate to improve the equity, transparency and effectiveness of PLAs across provinces. PMID:23968637

  15. 78 FR 42084 - Cooperative Agreement to Support the World Trade Organization's Standards and Trade Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... Organization for Animal Health, World Bank, World Health Organization (WHO) and the WTO. The STDF supports...] Cooperative Agreement to Support the World Trade Organization's Standards and Trade Development Facility... cooperative agreement in fiscal year 2013 (FY 2013) to the World Trade Organization's (WTO) Standards and...

  16. Foods Served in Child Care Facilities Participating in the Child and Adult Care Food Program: Menu Match and Agreement with the New Meal Patterns and Best Practices.

    PubMed

    Dave, Jayna M; Cullen, Karen W

    2018-06-01

    To assess the agreement of posted menus with foods served to 3- to 5-year-old children attending federal Child and Adult Care Food Program (CACFP)-enrolled facilities, and the degree to which the facilities met the new meal patterns and best practices. On-site observations and menu coding. Nine early care and education centers. Agreement of posted menus with foods served, and comparison of foods served and consumed with the new CACFP meal guidelines and best practices. Data were compiled for each meal (breakfast, lunch, and snacks). Frequencies and percentages of agreement with the posted menu (coded matches, substitutions, additions, and omissions) were calculated for each food component in the CACFP menu guidelines. Menu total match was created by summing the menu match plus acceptable substitutions. Menus were compared with the new CACFP meal guidelines and best practices. The match between the posted menus and foods actually served to children at breakfast, lunch, and snack was high when the acceptable menu substitutions were considered (approximately 94% to 100% total match). Comparing the menus with the new meal guidelines and best practices, the 1 guideline that was fully implemented was serving only unflavored, low-fat, or 1% milk; fruit and vegetable guidelines were partially met; fruit juice was not served often, nor were legumes; the guideline for 1 whole grain-rich serving/d was not met; and regular beef and full-fat cheese products were commonly served. Early care and education centers enrolled in CACFP provided meals that met the current CACFP guidelines. Some menu improvements are needed for the centers to meet the new guidelines and best practices. Copyright © 2018 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  17. 75 FR 18572 - Facility Control Numbers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Facility Control Numbers AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of planned use of Facility Control Numbers. SUMMARY: The IRS has developed and is publishing in this issue of the Federal Register, Facility Control Numbers to...

  18. Planning for Education: Space Guidelines for Planning Educational Facilities. Revised.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    This booklet provides guidelines for school planners and designers on the state requirements for space allocation in its K-12 public schools. Recommendations are included for various specialized facilities to assure that proper spaces can be provided beyond the typical classroom space. Guidelines are arranged under the categories of instructional,…

  19. U.S.-Iraq Agreements: Congressional Oversight Activities and Legislative Response

    DTIC Science & Technology

    2009-05-15

    in creating the planned agreements, from negotiation to implementation, and took action to ensure such involvement. Members proposed numerous...matter experts. This has equipped Congress with information pertinent to deciding what further action can be taken to involve Congress more in the...concerning the negotiation, execution, and early implementation of the agreements; the second describes in detail the actions taken by Congress thus

  20. National Facilities study

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This study provides a set of recommendations for improving the effectiveness of our nation's aeronautics and space facilities. The study plan considers current and future government and commercial needs as well as DOD and NASA mission requirements through the year 2023. It addresses shortfalls in existing capabilities, new facility requirements, upgrades, consolidations, and phase-out of existing facilities. If the recommendations are implemented, they will provide world-class capability where it is vital to our country's needs and make us more efficient in meeting future needs.

  1. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  2. Master Planning School District Facility Needs

    ERIC Educational Resources Information Center

    Prager, Gary; Matschulat, Robert

    2010-01-01

    Most educational entities confront any number of facility issues. Upgrading the physical infrastructure to meet current and future demands can be intimidating. The quantity and magnitude of capital issues in a changing environment can be overwhelming. How can all this complexity be made coherent to assure that decisions are sound and limited…

  3. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  4. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  5. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  6. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  7. 40 CFR 265.53 - Copies of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  8. New Trends in Facility Asset Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2000-01-01

    Explains new, positive trends in facility asset management that encompasses greater acceptance and involvement of facility managers in the financial planning process, greater awareness of the need for maintenance, and facility administrators taking a greater role with business officers. The new climate for alternative renewal financing proposals…

  9. 40 CFR 305.25 - Informal settlement; voluntary agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Informal settlement; voluntary...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE... Prehearing Procedures § 305.25 Informal settlement; voluntary agreement. (a) Settlement policy. The Agency...

  10. Exploring approaches to the administration of a long-term care facility: The application of a community planning and development process.

    PubMed

    Caldwell, W J

    1996-01-01

    This article outlines the approaches taken to the management of two long-term care facilities by the County of Huron in southwestern Ontario in 1994. Lay-offs, a move to new facilities, loss of local political confidence, changes in key administrative personnel and low staff morale prompted the county to ask an interim administrative team to develop and implement an appropriate response. The article explains how community development and planning principles and techniques were applied to the management of the homes to achieve an overall improvement in communication, staff morale and attitude. These approaches may prove helpful to other administrations facing major change.

  11. Planning for a Healthier School Facility

    ERIC Educational Resources Information Center

    Belew, Rachel

    2012-01-01

    One might assume that, within the walls of a school, it is the shared responsibility of the school nurse, guidance counselor, physical fitness instructor, and food services staff to protect student health. In truth, such an important responsibility also belongs, in very large part, to the educational facility planner and school maintenance staff.…

  12. FACILITIES FOR PHYSICAL FITNESS.

    ERIC Educational Resources Information Center

    MUSIAL, STAN

    THIS ARTICLE CITES THE LOW PRIORITY THAT PHYSICAL EDUCATION GENERALLY HAS IN CURRICULUM AND SCHOOL FACILITY PLANNING. IT ALSO CITES THE REASONS FOR DEVELOPING MORE ADEQUATE PHYSICAL EDUCATION FACILITIES--(1) OUR WAY OF LIFE NO LONGER PROVIDES VIGOROUS PHYSICAL ACTIVITY NECESSARY FOR HEALTHY DEVELOPMENT, (2) A DIRECT RELATIONSHIP EXISTS BETWEEN…

  13. 10 CFR 60.47 - Facility information and verification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Facility information and verification. 60.47 Section 60.47 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Us/iaea Safeguards Agreement § 60.47 Facility information and verification. (a) In...

  14. 10 CFR 61.32 - Facility information and verification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Facility information and verification. 61.32 Section 61.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses Us/iaea Safeguards Agreement § 61.32 Facility information and verification. (a) In...

  15. 10 CFR 61.32 - Facility information and verification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Facility information and verification. 61.32 Section 61.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses Us/iaea Safeguards Agreement § 61.32 Facility information and verification. (a) In...

  16. 10 CFR 61.32 - Facility information and verification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Facility information and verification. 61.32 Section 61.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses Us/iaea Safeguards Agreement § 61.32 Facility information and verification. (a) In...

  17. 78 FR 67027 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ...-1070] RIN 1625-AB27 Nontank Vessel Response Plans and Other Response Plan Requirements AGENCY: Coast... Guard amended regulations on response plans for nontank vessels. The amendment triggered information... facility response plans. This notice announces that the collection of information has been approved by the...

  18. The Environmental Justice Collaborative Problem-Solving Cooperative Agreement Program

    EPA Pesticide Factsheets

    The Environmental Justice Collaborative Problem-Solving (CPS) Cooperative Agreement Program provides financial assistance to eligible organizations working on or planning to work on projects to address local environmental and/or public health issues

  19. Charter School Facilities: A Resource Guide on Development and Financing.

    ERIC Educational Resources Information Center

    Jakubowski, Lara

    This manual provides information to help charter schools navigate the facility development process, including worksheets that can be customized to suit a particular school's needs. Sections cover how facility planning fits into business planning for charter schools, review a process for assessing a school's facility needs, and summarize how to…

  20. Assessing the validity and intra-observer agreement of the MIDAM-LTC; an instrument measuring factors that influence personal dignity in long-term care facilities

    PubMed Central

    2014-01-01

    Background Patients who are cared for in long-term care facilities are vulnerable to lose personal dignity. An instrument measuring factors that influence dignity can be used to better target dignity-conserving care to an individual patient, but no such instrument is yet available for the long-term care setting. The aim of this study was to create the Measurement Instrument for Dignity AMsterdam - for Long-Term Care facilities (MIDAM-LTC) and to assess its validity and intra-observer agreement. Methods Thirteen items specific for the LTC setting were added to the earlier developed, more general MIDAM. The MIDAM-LTC consisted of 39 symptoms or experiences for which presence as well as influence on dignity were asked, and a single item score for overall personal dignity. Questionnaires containing the MIDAM-LTC were administered face-to-face at two moments (with a 1-week interval) to 95 nursing home residents residing on general medical wards of six nursing homes in the Netherlands. Constructs related to dignity (WHO Well-Being Five Index, quality of life and physical health status) were also measured. Ten residents answered the questions while thinking aloud. Content validity, construct validity and intra-observer agreement were examined. Results Nine of the 39 items barely exerted influence on dignity. Eight of them could be omitted from the MIDAM-LTC, because the thinking aloud method revealed sensible explanations for their small influence on dignity. Residents reported that they missed no important items. Hypotheses to support construct validity, about the strength of correlations between on the one hand personal dignity and on the other hand well-being, quality of life or physical health status, were confirmed. On average, 83% of the scores given for each item’s influence on dignity were practically consistent over 1 week, and more than 80% of the residents gave consistent scores for the single item score for overall dignity. Conclusion The MIDAM-LTC has good

  1. Administering the Preschool Facility.

    ERIC Educational Resources Information Center

    Coonrod, Debbie

    Securing the right environment for a preschool program requires planning and research. Administrators or searching parties are advised to study zoning codes to become acquainted with state sanitation and safety regulations and laws, to involve teachers in cooperative planning, to design facilities which discourage vandalism, facilitate…

  2. NORTH AMERICAN REGIONAL ACTION PLAN ON MERCURY

    EPA Science Inventory

    The North American Regional Action Plan (NARAP) on Mercury is one of a number of action plans that stem from the North American Agreement on Environmental Cooperation between the governments of Canada, Mexico and the United States. That Agreement established the Commission for En...

  3. Planning Guide for Secondary School Music Facilities.

    ERIC Educational Resources Information Center

    Wenger Corp., Owatonna, MN.

    This planning guide focuses on the fundamental requirements for planning and designing school music suites. The guide provides brief explanations of critical factors affecting music suites so that music directors and other stakeholders can more quickly and clearly communicate music area fundamentals to architects and administrators. Topics cover…

  4. 30 CFR 285.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651... facilities on my limited lease or any facilities on my project easement proposed under my GAP? If you are...

  5. Access to Vocational Education. A Planning System for Local Secondary and Post-Secondary Program and Facility Accessibility. Step 3: Generating Strategies.

    ERIC Educational Resources Information Center

    Rice, Eric; And Others

    This guidebook focuses on the third of five steps included in a planning system for improving local secondary and postsecondary program and facilities accessibility: generating strategies. The guidebook is comprised of four sections, each describing a specific technique for generating strategies. Techniques presented are (1) nominal group…

  6. An exercise in controversy. Case study: revising a physician employment agreement.

    PubMed

    Fitzgerald, Paul E; Burkett, Steven H; Key, Charles M

    2003-01-01

    The physician employment agreement at a faculty practice plan did not meet the needs of a modern health care employer or its medical staff. This article describes the communication among medical group management, medical leadership and the medical staff during the revision of the agreement, as well as the process used to develop a new document.

  7. 24 CFR 572.225 - Grant agreements; corrective and remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES HOPE FOR HOMEOWNERSHIP OF SINGLE FAMILY HOMES PROGRAM (HOPE 3) Grants § 572.225 Grant agreements; corrective and remedial actions. (a) Terms and... not incurring further costs for the affected activities; (iv) Reimbursing its HOPE 3 program account...

  8. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  9. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  10. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  11. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  12. 33 CFR 154.1030 - General response plan contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false General response plan contents... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1030 General response plan contents. (a) The plan must be written in English. (b) A response...

  13. 33 CFR 106.305 - Facility Security Assessment (FSA) requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., including computer systems and networks; (vi) Existing agreements with private security companies; (vii) Any... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Facility Security Assessment (FSA... SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental...

  14. 33 CFR 106.305 - Facility Security Assessment (FSA) requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., including computer systems and networks; (vi) Existing agreements with private security companies; (vii) Any... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Facility Security Assessment (FSA... SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental...

  15. 33 CFR 106.305 - Facility Security Assessment (FSA) requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., including computer systems and networks; (vi) Existing agreements with private security companies; (vii) Any... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Facility Security Assessment (FSA... SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental...

  16. 33 CFR 106.305 - Facility Security Assessment (FSA) requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., including computer systems and networks; (vi) Existing agreements with private security companies; (vii) Any... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Facility Security Assessment (FSA... SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental...

  17. 43 CFR 3162.6 - Well and facility identification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Well and facility identification. 3162.6... for Operating Rights Owners and Operators § 3162.6 Well and facility identification. (a) Every well within a Federal or Indian lease or supervised agreement shall have a well indentification sign. All...

  18. 43 CFR 3162.6 - Well and facility identification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Well and facility identification. 3162.6... for Operating Rights Owners and Operators § 3162.6 Well and facility identification. (a) Every well within a Federal or Indian lease or supervised agreement shall have a well indentification sign. All...

  19. 43 CFR 3162.6 - Well and facility identification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Well and facility identification. 3162.6... for Operating Rights Owners and Operators § 3162.6 Well and facility identification. (a) Every well within a Federal or Indian lease or supervised agreement shall have a well indentification sign. All...

  20. Family planning utilization and factors associated among women receiving abortion services in health facilities of central zone towns of Tigray, Northern Ethiopia: a cross sectional Study.

    PubMed

    Hagos, Goshu; Tura, Gurmesa; Kahsay, Gizienesh; Haile, Kebede; Grum, Teklit; Araya, Tsige

    2018-06-05

    Abortion remains among the leading causes of maternal death worldwide. Post-abortion contraception is significantly effective in preventing unintended pregnancy and abortion if provided before women leave the health facilty. However, the status of post-abortion family planning (PAFP) utilization and the contributing factors are not well studied in Tigray region. So, we conduct study aimed on family planning utilization and factors associated with it among women receiving abortion services. A facility based cross-sectional study design was conducted among women receiving abortion services in central zone of Tigray from December 2015to February 2016 using a total of 416 sample size. Women who came for abortion services were selected using systematic random sampling technique.. The data were collected using a pre-tested interviewer administered questionnair. Data were coded and entered in to Epi info 7 and then exported to SPSS for analysis. Descriptive statisticslike frequencies and mean were computed to display the results. Both Bivariable and multivariable logistic regression was used in the analysis. Variables statistically significant at p < 0.05 in the bivariable analysis were checked in multivariable logistic regration to identify independently associated factors. Then variables which were significantly associated with post abortion family planning utilization at p-value < 0.05 in the multivariable analysis were declared as significantly associated factors. A total of 409 abortion clients were interviewed in this study with 98.3% of response rate. Majority 290 (70.9%) of study participants utilized contracepives after abortion. Type of health facility, the decision maker on timing of having child, knowledge that pregnancy can happen soon after abortion and husband's opposition towards contraceptives were significantly associated with Post-abortion family planning ustilization. About one-third of abortion women failed to receive contraceptive before