Sample records for facility buildings 9720-15

  1. Site-specific standard request for underground storage tanks 1219-U, 1222-U, 2082-U, and 2068-U at the rust garage facility buildings 9754-1 and 9720-15: Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Facility ID No. 0-010117

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-01

    This document represents a Site-specific Standard Request for underground storage tanks (USTs) 1219-U,1222-U and 2082-U previously located at former Building 9754-1, and tank 2086-U previously located at Building 9720-15, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The tanks previously contained petroleum products. For the purposes of this report, the two building sites will be regarded as a single UST site and will be referred to as the Rust Garage Facility. The current land use associated with the Y-12 Plant is light industrial and the operational period of the plant is projected to be at least 30 years. Thus, potential futuremore » residential exposures are not expected to occur for at least 30 years. Based on the degradation coefficient for benzene (the only carcinogenic petroleum constituent detected in soils or groundwater at the Rust Garage Facility), it is expected that the benzene and other contaminants at the site will likely be reduced prior to expiration of the 30-year plant operational period. As the original sources of petroleum contamination have been removed, and the area of petroleum contamination is limited, a site-specific standard is therefore being requested for the Rust Garage Facility.« less

  2. 38 CFR 21.9720 - Certification of enrollment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Certification of enrollment. 21.9720 Section 21.9720 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Pursuit of Courses § 21.9720 Certification of enrollment. Except as stated in §...

  3. 29 CFR 97.20 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Standards for financial management systems. 97.20 Section 97... COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 97.20 Standards for financial management systems. (a) A State must expand and account for grant funds in...

  4. 57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. BUILDING NO. 1071, ORDNANCE FACILITY (CRYSTALLIZATION BUILDING), LOOKING AT SOUTHEAST SIDE. NOTE ESCAPE CHUTES PROJECTING FROM SIDES OF BUILDING. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  5. 29 CFR 97.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... attendance records, contract and subgrant award documents, etc. (7) Cash management. Procedures for... 29 Labor 1 2011-07-01 2011-07-01 false Standards for financial management systems. 97.20 Section... Standards for financial management systems. (a) A State must expand and account for grant funds in...

  6. 29 CFR 97.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... attendance records, contract and subgrant award documents, etc. (7) Cash management. Procedures for... 29 Labor 1 2013-07-01 2013-07-01 false Standards for financial management systems. 97.20 Section... Standards for financial management systems. (a) A State must expand and account for grant funds in...

  7. 29 CFR 97.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... attendance records, contract and subgrant award documents, etc. (7) Cash management. Procedures for... 29 Labor 1 2012-07-01 2012-07-01 false Standards for financial management systems. 97.20 Section... Standards for financial management systems. (a) A State must expand and account for grant funds in...

  8. 29 CFR 97.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... attendance records, contract and subgrant award documents, etc. (7) Cash management. Procedures for... 29 Labor 1 2014-07-01 2013-07-01 true Standards for financial management systems. 97.20 Section 97... Standards for financial management systems. (a) A State must expand and account for grant funds in...

  9. 63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), INTERIOR, LOOKING SOUTHEAST DOWN SCREENED WALKWAY ON NORTHWEST SIDE. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  10. 62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. BUILDING NO. 1301, ORDNANCE FACILITY (MORTAR POWDER BUILDING), LOOKING AT NORTHWEST FACADE. ACCESS TO ROOF ALLOWS MAINTENANCE OF VENTILATION EQUIPMENT WHICH IS PLACED OUTSIDE BUILDING TO MINIMIZE EXPLOSION HAZARD. NO. 2 VISIBLE ON WALL OF BUILDING STANDS FOR EXPLOSION HAZARD WITH FRAGMENTATION. - Picatinny Arsenal, State Route 15 near I-80, Dover, Morris County, NJ

  11. 40 CFR 97.20 - General NOX Budget Trading Program permit requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false General NOX Budget Trading Program... (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.20 General NOX Budget Trading Program permit requirements. (a) For each NOX Budget source...

  12. 40 CFR 97.20 - General NOX Budget Trading Program permit requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false General NOX Budget Trading Program... (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.20 General NOX Budget Trading Program permit requirements. (a) For each NOX Budget source...

  13. 40 CFR 97.20 - General NOX Budget Trading Program permit requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false General NOX Budget Trading Program... (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.20 General NOX Budget Trading Program permit requirements. (a) For each NOX Budget source...

  14. 40 CFR 97.20 - General NOX Budget Trading Program permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false General NOX Budget Trading Program... (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.20 General NOX Budget Trading Program permit requirements. (a) For each NOX Budget source...

  15. 40 CFR 97.20 - General NOX Budget Trading Program permit requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false General NOX Budget Trading Program... (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS Permits § 97.20 General NOX Budget Trading Program permit requirements. (a) For each NOX Budget source...

  16. 15. SITE BUILDING 004 ELECTRIC POWER STATION VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. SITE BUILDING 004 - ELECTRIC POWER STATION - VIEW IS LOOKING SOUTH 55° EAST AT FIVE DIESEL ENGINE/ GENERATOR SILENCER SYSTEM EXHAUST STACKS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  17. 15. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. 1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON RIGHT, BUILDING 22 ON LEFT, AND BUILDING 1 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA

  19. 3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ON LEFT, BUILDING 40 GARAGE IN CENTER, AND BUILDING 4 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA

  20. 15. View of the Main Office (Buildings 1, 2, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View of the Main Office (Buildings 1, 2, and 3), U.S. Plant Introduction Station, Glenn Dale, MD, ca. 1950. Facilities and Engineering Branch. Beltsville Agricultural Research Center, Building 426. - U.S. Plant Introduction Station, 11601 Old Pond Road, Glenn Dale, Prince George's County, MD

  1. 9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  2. 8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  3. 10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  4. 15. VIEW OF LABORATORY EQUIPMENT IN THE BUILDING 771 ANALYTICAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF LABORATORY EQUIPMENT IN THE BUILDING 771 ANALYTICAL LABORATORY. THE LAB ANALYZED SAMPLES FOR PLUTONIUM, AMERICIUM, URANIUM, NEPTUNIUM, AND OTHER RADIOACTIVE ISOTOPES. (9/25/62) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  5. 13. Building 105, Facilities Engineering Building, 1830, interior, tin metal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 105, Facilities Engineering Building, 1830, interior, tin metal shop area, showing construction of window and part of ceiling, E wall of building. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  6. 14 CFR 142.15 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Facilities. 142.15 Section 142.15... OTHER CERTIFICATED AGENCIES TRAINING CENTERS General § 142.15 Facilities. (a) An applicant for, or..., sanitation, and health codes; and (2) The facilities used for instruction are not routinely subject to...

  7. 43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), DETAIL OF EXPLOSION-PROOF ELECTRICAL SWITCH BOX (SWITCH GEAR INSIDE BOX SUBMERGED IN OIL TO QUENCH SPARKS), SWITCH EQUIPMENT MADE BY GENERAL ELECTRIC. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  8. 40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. BUILDING NO. 454, ORDNANCE FACILITY (BAG CHANGE FILLING PLANT), DETAIL SOUTHEAST SIDE OF EXTERIOR ELECTRICAL EQUIPMENT ROOM, SHOWING DOOR TO SEWING ROOM NO. 3, VENTILATOR FAN (OVER DOOR), STEAM LINE (PIPE), SEWING MACHINE MOTOR IN OVERHEAD, ALARM BELL, EXPLOSION-PROOF SWITCH BOXES, GROUNDS ON DOORS, PULL ALARM HANDLE (EXTREME RIGHT; PULLEY CABLE CONDUCTED IN CONDUIT TO SWITCH INSIDE BUILDING. PULLEYS INSIDE ALL ELBOW JOINTS.) - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  9. 14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY

  10. Upgrades and Enclosure of Building 15 at Technical Area 40: Los Alamos National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plimpton, Kathryn D; Garcia, Kari L. M; Brunette, Jeremy Christopher

    The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to upgrade and enclose Building 15 at Technical Area (TA) 40, Los Alamos National Laboratory. Building TA-40-15, a Cold War-era firing site, was determined eligible for listing in the National Register of Historic Places (Register) in DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69 (McGehee et al. 2005). Building TA-40-15 was constructed in 1950 to support detonator testing. The firing site will be enclosed by a steel building tomore » create a new indoor facility that will allow for year-round mission capability. Enclosing TA-40-15 will adversely affect the building by altering the characteristics that make it eligible for the Register. In compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, the Field Office is initiating consultation for this proposed undertaking. The Field Office is also requesting concurrence with the use of standard practices to resolve adverse effects as defined in the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico.« less

  11. 23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR, LOOKING SOUTH DOWN CENTRAL CORRIDOR. NOTE BINS IN WALLS ON EITHER SIDE OF CORRIDOR, USED FOR PASSING EXPLOSIVES AND LOADED ITEMS TO SIEVING ROOMS BEYOND WALLS. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  12. MINIMUM AREAS FOR ELEMENTARY SCHOOL BUILDING FACILITIES.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Public Instruction, Harrisburg.

    MINIMUM AREA SPACE REQUIREMENTS IN SQUARE FOOTAGE FOR ELEMENTARY SCHOOL BUILDING FACILITIES ARE PRESENTED, INCLUDING FACILITIES FOR INSTRUCTIONAL USE, GENERAL USE, AND SERVICE USE. LIBRARY, CAFETERIA, KITCHEN, STORAGE, AND MULTIPURPOSE ROOMS SHOULD BE SIZED FOR THE PROJECTED ENROLLMENT OF THE BUILDING IN ACCORDANCE WITH THE PROJECTION UNDER THE…

  13. Site-specific standard request for Underground Storage Tanks 1219-U, 1222-U, 2082-U, and 2068-U at the Rust Garage Facility Buildings 9754-1 and 9720-15

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    This document is a site-specific standard request for underground storage tanks located at the Rust Garage Facility. These standards are justified based on conclusion derived from the exposure assessment that indicates there is no current or forseeable future human health risk associated with petroleum contaminants on the site, that current and future ecological risks would be generally limited to subsurface species and plant life with roots extending into the area, and that most of the impacted area at the site is covered by asphalt or concrete. The vertical and horizontal extent of soil and ground water contamination are limited tomore » immediate area of the Rust Garage Facility.« less

  14. Facility Focus: Academic and Administrative Buildings.

    ERIC Educational Resources Information Center

    College Planning & Management, 1999

    1999-01-01

    Describes how academic and administrative buildings can be designed to support learning into the next century in the following examples: an applied science an engineering facility; a college greenhouse; and a public affairs classroom building. Photos and floor plans accompany each example. (GR)

  15. 24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. BUILDING NO. 452, ORDNANCE FACILITY (BAG CHARGE FILLING PLANT), INTERIOR VIEW LOOKING WEST AT NORTH END OF CENTRAL CORRIDOR (ROOM 3). STAIRWAY WORKBENCH WITH COMPRESSED-AIR POWERED CARTRIDGE LOADER. ARMORED PASS-THROUGH OF TRANSFER BOX FOR PASSING EXPLOSIVES MATERIALS THROUGH TO NEXT ROOM TO THE NORTH. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  16. 45. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH BUILDING METAL SIDING BEING APPLIED ON "A" FACE (LEFT) AND "B" FACE (RIGHT). NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  17. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  18. Research Support Facility (RSF): Leadership in Building Performance (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This brochure/poster provides information on the features of the Research Support Facility including a detailed illustration of the facility with call outs of energy efficiency and renewable energy technologies. Imagine an office building so energy efficient that its occupants consume only the amount of energy generated by renewable power on the building site. The building, the Research Support Facility (RSF) occupied by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) employees, uses 50% less energy than if it were built to current commercial code and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED{reg_sign})more » Platinum rating. With 19% of the primary energy in the U.S. consumed by commercial buildings, the RSF is changing the way commercial office buildings are designed and built.« less

  19. The Influence of Building Codes on Recreation Facility Design.

    ERIC Educational Resources Information Center

    Morrison, Thomas A.

    1989-01-01

    Implications of building codes upon design and construction of recreation facilities are investigated (national building codes, recreation facility standards, and misperceptions of design requirements). Recreation professionals can influence architectural designers to correct past deficiencies, but they must understand architectural and…

  20. Building Air Quality: A Guide for Building Owners and Facility Managers.

    ERIC Educational Resources Information Center

    Agle, Elizabeth; Galbraith, Susan

    The past two decades have witnessed increased concerns over the health and comfort of indoor air quality (IAQ), but little indoor air-related information has been targeted at building owners and facility managers of public and commercial buildings. This manual, specifically created for such a population, provides guidance on preventing,…

  1. 46. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH ALL METAL SIDING INSTALLED AND WITH EMITTER/ANTENNA ARRAY SYSTEM NEARING OCMPLETION ON "B" FACE (RIGHT). VIEW ALSO SHOWS TRAVELING "CLEANING" SYSTEM ON "B" FACE - NOW REMOVED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. 10 CFR 75.15 - Facility attachments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Facility attachments. 75.15 Section 75.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Material... under Article 39(b) of the main text of the Safeguards Agreement, do not have Facility Attachments or...

  3. 10 CFR 75.15 - Facility attachments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Facility attachments. 75.15 Section 75.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Material... under Article 39(b) of the main text of the Safeguards Agreement, do not have Facility Attachments or...

  4. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Facility agreements. 716.6 Section 716... ROUTINE INSPECTIONS OF DECLARED FACILITIES § 716.6 Facility agreements. (a) Description and requirements. A facility agreement is a site-specific agreement between the U.S. Government and the OPCW. Its...

  5. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Facility agreements. 716.6 Section 716... ROUTINE INSPECTIONS OF DECLARED FACILITIES § 716.6 Facility agreements. (a) Description and requirements. A facility agreement is a site-specific agreement between the U.S. Government and the OPCW. Its...

  6. Sampling and analysis plan for assessment of beryllium in soils surrounding TA-40 building 15

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruedig, Elizabeth

    Technical Area (TA) 40 Building 15 (40-15) is an active firing site at Los Alamos National Laboratory. The weapons facility operations (WFO) group plans to build an enclosure over the site in 2017, so that test shots may be conducted year-round. The enclosure project is described in PRID 16P-0209. 40-15 is listed on LANL OSH-ISH’s beryllium inventory, which reflects the potential for beryllium in/on soils and building surfaces at 40-15. Some areas in and around 40-15 have previously been sampled for beryllium, but past sampling efforts did not achieve complete spatial coverage of the area. This Sampling and Analysis Planmore » (SAP) investigates the area surrounding 40-15 via 9 deep (≥1-ft.) soil samples and 11 shallow (6-in.) soil samples. These samples will fill the spatial data gaps for beryllium at 40-15, and will be used to support OSH-ISH’s final determination of 40-15’s beryllium registry status. This SAP has been prepared by the Environmental Health Physics program in consultation with the Industrial Hygiene program. Industrial Hygiene is the owner of LANL’s beryllium program, and will make a final determination with regard to the regulatory status of beryllium at 40-15.« less

  7. A Facilities Manager's Guide to Green Building Design.

    ERIC Educational Resources Information Center

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  8. Evaluating building performance in healthcare facilities: an organizational perspective.

    PubMed

    Steinke, Claudia; Webster, Lynn; Fontaine, Marie

    2010-01-01

    Using the environment as a strategic tool is one of the most cost-effective and enduring approaches for improving public health; however, it is one that requires multiple perspectives. The purpose of this article is to highlight an innovative methodology that has been developed for conducting comprehensive performance evaluations in public sector health facilities in Canada. The building performance evaluation methodology described in this paper is a government initiative. The project team developed a comprehensive building evaluation process for all new capital health projects that would respond to the aforementioned need for stakeholders to be more accountable and to better integrate the larger organizational strategy of facilities. The Balanced Scorecard, which is a multiparadigmatic, performance-based business framework, serves as the underlying theoretical framework for this initiative. It was applied in the development of the conceptual model entitled the Building Performance Evaluation Scorecard, which provides the following benefits: (1) It illustrates a process to link facilities more effectively to the overall mission and goals of an organization; (2) It is both a measurement and a management system that has the ability to link regional facilities to measures of success and larger business goals; (3) It provides a standardized methodology that ensures consistency in assessing building performance; and (4) It is more comprehensive than traditional building evaluations. The methodology presented in this paper is both a measurement and management system that integrates the principles of evidence-based design with the practices of pre- and post-occupancy evaluation. It promotes accountability and continues throughout the life cycle of a project. The advantage of applying this framework is that it engages health organizations in clarifying a vision and strategy for their facilities and helps translate those strategies into action and measurable performance

  9. The New Facilities for Neutron Radiography at the LVR-15 Reactor

    NASA Astrophysics Data System (ADS)

    Soltes, J.; Viererbl, L.; Vacik, J.; Tomandl, I.; Krejci, F.; Jakubek, J.

    2016-09-01

    Neutron radiography is an imaging method often used at research reactor sites. Back in 2011 a project was started with the goal to build a neutron radiography facility at the site of the LVR-15 research reactor in Rez, Czech Republic. In the scope of the project two horizontal channels were adapted for the needs of neutron radiography. This comprises the HC1 channel which offers an intense thermal neutron beam with a diameter of 10 cm, which can be used for imaging of larger samples, and the HC3 channel which beam is restricted just to 4x80 mm2, but is highly thermalized, collimated and reduced from gamma background, thus capable of providing better radiograph resolution. Both facilities are equipped with newest Timepix based detectors, with thin 6LiF converters for neutron detection capable of delivering high resolution. Both facilities offer a unique opportunity for non-destructive testing in the Czech region. In 2015 both facilities were put into test operation and several radiographs were acquired, which are presented in the following text.

  10. Design-Build Process for the Research Support Facility (RSF) (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-06-01

    An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.

  11. 1. West facade of Plutonium Concentration Facility (Building 233S), ReductionOxidation ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West facade of Plutonium Concentration Facility (Building 233-S), Reduction-Oxidation Building (REDOX-202-S) to the right. Looking east. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA

  12. VIEW OF BUILDING 122 WHICH HOUSES THE ONSITE MEDICAL FACILITIES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 WHICH HOUSES THE ON-SITE MEDICAL FACILITIES OF THE ROCKY FLATS PLANT AND THE OCCUPATIONAL HEALTH AND INTERNAL DOSIMETRY ORGANIZATIONS. EMERGENCY MEDICAL SERVICES, DIAGNOSIS, DECONTAMINATION, FIRST AID, X-RAY, MINOR SURGICAL TREATMENT, AND AMBULATORY ACTIVITIES ARE CARRIED OUT IN THIS BUILDING. (1/98) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  13. 7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WASTE CALCINING FACILITY, LOOKING AT NORTH END OF BUILDING. CAMERA FACING SOUTH. TENT-ROOFED COVER IN RIGHT OF VIEW IS A TEMPORARY WEATHER-PROOFING SHELTER OVER THE BLOWER PIT IN CONNECTION WITH DEMOLITION PROCEDURES. SMALL BUILDING CPP-667 IN CENTER OF VIEW WAS USED FOR SUPPLEMENTARY OFFICE SPACE BY HEALTH PHYSICISTS AND OTHERS. INEEL PROOF SHEET NOT NUMBERED. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  14. Performance evaluation of the Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Jensen, R. N.

    1981-01-01

    The general performance of the NASA Solar Building Test Facility (SBTF) and its subsystems and components over a four year operational period is discussed, and data are provided for a typical one year period. The facility consists of a 4645 sq office building modified to accept solar heated water for operation of an absorption air conditioner and a baseboard heating system. An adjoining 1176 sq solar flat plate collector field with a 114 cu tank provides the solar heated water. The solar system provided 57 percent of the energy required for heating and cooling on an annual basis. The average efficiency of the solar collectors was 26 percent over a one year period.

  15. VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE AND SUBCONTRACTOR PHYSICAL EXAMINATIONS. (10/85) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  16. 40 CFR 160.15 - Inspection of a testing facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Inspection of a testing facility. 160.15 Section 160.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.15 Inspection of a testing facility...

  17. 40 CFR 160.15 - Inspection of a testing facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 24 2011-07-01 2011-07-01 false Inspection of a testing facility. 160.15 Section 160.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS General Provisions § 160.15 Inspection of a testing facility...

  18. Panorama, section 2 of 3, note the Operations Building (Facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Panorama, section 2 of 3, note the Operations Building (Facility 294) in the center of facility, view facing west - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  19. FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP603) SHOWING STORAGE BASINS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS, FUEL ELEMENT CUTTING FACILITY, AND DRY GRAPHITE STORAGE FACILITY. INL DRAWING NUMBER 200-0603-00-030-056329. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  20. BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 67 CENTER, ENGINEERING AND FACILITIES MANAGEMENT TO THE RIGHT. BUILDING 67 IS SURMISED TO HAVE BEEN A RAILROAD STATION DAYS WHEN SITE WAS A RESORT - National Home for Disabled Volunteer Soldiers, Eastern Branch, 1 VA Center, Augusta, Kennebec County, ME

  1. 1. Building 15 west elevation oblique showing coal conveyor, chute ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Building 15 west elevation oblique showing coal conveyor, chute and hopper. Coal feeds boiler in Building 3. View looking SE. - John & James Dobson Carpet Mill (West Parcel), Building No. 15, 4041-4055 Ridge Avenue, Philadelphia, Philadelphia County, PA

  2. 6. Historic photo of rocket engine test facility Building 202 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Historic photo of rocket engine test facility Building 202 complex in operation at night, September 12, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA GRC photo number C-45924. - Rocket Engine Testing Facility, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. 55. Room BF9, paper shredding facility, basement level, building 500, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Room BF-9, paper shredding facility, basement level, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE

  4. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  5. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  6. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  7. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  8. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  9. Building Information Modeling (BIM) Primer. Report 1: Facility Life-Cycle Process and Technology Innovation

    DTIC Science & Technology

    2012-08-01

    Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a

  10. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south facade. Camera facing north. High-bay section is pool room. Single-story section at right is control building (TAN-645). Small metal building is post-1970 addition. INEEL negative no. HD-40-7-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  11. 43 CFR 15.3 - Dredging, filling, excavating and building activities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Dredging, filling, excavating and building activities. 15.3 Section 15.3 Public Lands: Interior Office of the Secretary of the Interior KEY LARGO CORAL REEF PRESERVE § 15.3 Dredging, filling, excavating and building activities. No dredging, excavating, or...

  12. 43 CFR 15.3 - Dredging, filling, excavating and building activities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Dredging, filling, excavating and building activities. 15.3 Section 15.3 Public Lands: Interior Office of the Secretary of the Interior KEY LARGO CORAL REEF PRESERVE § 15.3 Dredging, filling, excavating and building activities. No dredging, excavating, or...

  13. 43 CFR 15.3 - Dredging, filling, excavating and building activities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Dredging, filling, excavating and building activities. 15.3 Section 15.3 Public Lands: Interior Office of the Secretary of the Interior KEY LARGO CORAL REEF PRESERVE § 15.3 Dredging, filling, excavating and building activities. No dredging, excavating, or...

  14. 43 CFR 15.3 - Dredging, filling, excavating and building activities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Dredging, filling, excavating and building activities. 15.3 Section 15.3 Public Lands: Interior Office of the Secretary of the Interior KEY LARGO CORAL REEF PRESERVE § 15.3 Dredging, filling, excavating and building activities. No dredging, excavating, or...

  15. 43 CFR 15.3 - Dredging, filling, excavating and building activities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Dredging, filling, excavating and building activities. 15.3 Section 15.3 Public Lands: Interior Office of the Secretary of the Interior KEY LARGO CORAL REEF PRESERVE § 15.3 Dredging, filling, excavating and building activities. No dredging, excavating, or...

  16. Jake Garn Mission Simulator and Training Facility, Building 5, Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Trish; Deming, Joan

    2010-01-01

    In response to President George W. Bush's announcement in January 2004 that the Space Shuttle Program (SSP) would end in 2010, the National Aeronautics and Space Administration (NASA) completed a nation-wide historical survey and evaluation of NASA-owned facilities and properties (real property assets) at all its Centers and component facilities. The buildings and structures which supported the SSP were inventoried and assessed as per the criteria of eligibility for listing in the National Register of Historic Places (NRHP) in the context of this program. This study was performed in compliance with Section 110 of the National Historic Preservation Act (NHPA) of 1966 (Public Law 89-665), as amended; the National Environmental Policy Act (NEPA) of 1969 (Public Law 91-190); Executive Order (EO) 11593: Protection and Enhancement of the Cultural Environment; EO 13287, Preserve America, and other relevant legislation. As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities at was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC's contractor, Archaeological Consultants, Inc. As a result of this survey, the Jake Gam Mission Simulator and Training Facility (Building 5) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 5 was still used to support the SSP as an

  17. 7 CFR 15a.33 - Comparable facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Comparable facilities. 15a.33 Section 15a.33 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Education Programs and...

  18. 12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. SOUTHWEST VIEW OF BUILDING 25C (SUBSONIC AERODYNAMICS TEST FACILITY) (1992). - Wright-Patterson Air Force Base, Area B, Buildings 25 & 24,10-foot & 20-foot Wind Tunnel Complex, Northeast side of block bounded by K, G, Third, & Fifth Streets, Dayton, Montgomery County, OH

  19. FACILITY 72, INTERIOR. 15LIGHT DOUBLE DOORS WITH 15LIGHT SIDELIGHTS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 72, INTERIOR. 15-LIGHT DOUBLE DOORS WITH 15-LIGHT SIDELIGHTS AND 2-LIGHT TRANSOM. LIVING ROOM BEYOND. VIEW FACING NORTH-NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Senior Officers' Quarters Type C, North end of Makalapa Drive, Pearl City, Honolulu County, HI

  20. 15. Historic American Buildings Survey E. W. Russell, Photographer, May ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey E. W. Russell, Photographer, May 8, 1936 CLOSE-UP OF CORNICE ON REAR OF BUILDING - Spring Hill College, Main Building, Old Shell Road, Spring Hill, Mobile County, AL

  1. 7 CFR 15b.38 - Health care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Health care facilities. 15b.38 Section 15b.38... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Other Aid, Benefits, or Services § 15b.38 Health care... impaired. A recipient hospital that provides health services or benefits shall establish a procedure for...

  2. 7 CFR 15b.38 - Health care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Health care facilities. 15b.38 Section 15b.38... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Other Aid, Benefits, or Services § 15b.38 Health care... impaired. A recipient hospital that provides health services or benefits shall establish a procedure for...

  3. 7 CFR 15b.38 - Health care facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Health care facilities. 15b.38 Section 15b.38... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Other Aid, Benefits, or Services § 15b.38 Health care... impaired. A recipient hospital that provides health services or benefits shall establish a procedure for...

  4. 7 CFR 15b.38 - Health care facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Health care facilities. 15b.38 Section 15b.38... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Other Aid, Benefits, or Services § 15b.38 Health care... impaired. A recipient hospital that provides health services or benefits shall establish a procedure for...

  5. 26 CFR 1.141-8 - $15 million limitation for output facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 2 2011-04-01 2011-04-01 false $15 million limitation for output facilities. 1....141-8 $15 million limitation for output facilities. (a) In general—(1) General rule. Section 141(b)(4... million output limitation, the benefits and burdens test of § 1.141-7 applies, except that “$15 million...

  6. 26 CFR 1.141-8 - $15 million limitation for output facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false $15 million limitation for output facilities. 1....141-8 $15 million limitation for output facilities. (a) In general—(1) General rule. Section 141(b)(4... million output limitation, the benefits and burdens test of § 1.141-7 applies, except that “$15 million...

  7. OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE OF NORTHEAST END WITH FACILITY 252 PORTION OF BUILDING (FIRST-FLOOR CONCRETE PORTION) IN FOREGROUND. - U.S. Naval Base, Pearl Harbor, Combat Intelligence Center, Makalapa Drive in Makalapa Administration Area, Pearl City, Honolulu County, HI

  8. 15. INTERIOR, DETAIL OF SKYLIGHT AT ROOF PEAK, ORIGINAL BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR, DETAIL OF SKYLIGHT AT ROOF PEAK, ORIGINAL BUILDING - Newport News & Old Point Railway & Electric Company, Trolley Barn & Administration Building, 3400 Victoria Boulevard, Hampton, Hampton, VA

  9. 4. Anode Building. View is to the east. This facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Anode Building. View is to the east. This facility, which was used for the cleaning and manufacture of anodes, was documented prior to demolition in 1993. - Sullivan Electrolytic Zinc Plant, Government Gulch, Kellogg, Shoshone County, ID

  10. 40 CFR 792.15 - Inspection of a testing facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Inspection of a testing facility. 792.15 Section 792.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS General Provisions § 792.15 Inspection...

  11. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  12. Building Pressure: Modeling the Fiscal Future of California K-12 School Facilities

    ERIC Educational Resources Information Center

    Jain, Liz S.; Vincent, Jefrey M.

    2016-01-01

    Public school districts across California, particularly those in low-wealth areas, experience significant funding shortfalls for their facilities. Industry benchmarks suggest the state's K-12 school districts should spend nearly $18 billion a year to maintain their inventory, ensure buildings are up-to-date, and to build new spaces to handle…

  13. 41 CFR 102-74.15 - What are the facility management responsibilities of occupant agencies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the facility management responsibilities of occupant agencies? 102-74.15 Section 102-74.15 Public Contracts and Property... PROPERTY 74-FACILITY MANAGEMENT Facility Management § 102-74.15 What are the facility management...

  14. 15. BUILDING 239. SECTIONS AND DETAILS OF DRYING ROOMS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. BUILDING 239. SECTIONS AND DETAILS OF DRYING ROOMS AND MIXING ROOMS. March 6, 1941. - Frankford Arsenal, Building Nos. 239-239A, Southeast corner of Clay Street & Cray Road, Philadelphia, Philadelphia County, PA

  15. 15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED CA. 1975. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  16. 15. VIEW TO SOUTHWEST; EAST BACK MBE BUILDING, THIRD AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW TO SOUTHWEST; EAST BACK MBE BUILDING, THIRD AND SECOND FLOORS; GASOLINE PUMPS CENTER (Dobson) - Los Angeles Union Passenger Terminal, Mail, Baggage, & Express Building, 800 North Alameda Street, Los Angeles, Los Angeles County, CA

  17. 21 CFR 58.15 - Inspection of a testing facility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Inspection of a testing facility. 58.15 Section 58.15 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES General Provisions § 58.15 Inspection of a testing...

  18. Characterization report for Building 301 Hot Cell Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-07-01

    During the period from October, 1997, through March, 1998, ANL-E Health Physics conducted a pre-D and D characterization of Building 301, referred to as the Hot Cell Facility. While primary emphasis was placed on radiological evaluation, the presence of non-nuclear hazardous and toxic material was also included in the scope of the characterization. This is one of the early buildings on the ANL-E site, and was heavily used in the 1950`s and 1960`s for various nuclear reaction and reactor design studies. Some degree of cleanup and contamination fixation was done in the 1970`s, so that the building could be usedmore » with a minimum of risk of personnel contamination. Work records are largely nonexistent for the early history of the building, so that any assumptions about extent and type of contamination had to be kept very open in the survey planning process. The primary contaminant was found to be painted-over Cs-137 embedded in the concrete floors, although a variety of other nuclides consistent with the work said to have been performed were found in smaller quantities. Due to leaks and drips through the floor, a relatively modest amount of soil contamination was found in the service trench under the building, not penetrating deeply. Two contaminated, disconnected drain lines leaving the building could not be traced by site records, and remain a problem for remediation. The D and D Characterization Plan was fulfilled.« less

  19. 15. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW TO NORTH. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO

  20. 15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER CONSTRUCTION. THE VAULTS WERE USED TO STORE TRIGGERS AWAITING OFF-SITE SHIPMENT, OR RETURNED TRIGGERS AWAITING TO BE TRANSPORTED TO A BUILDING FOR RECOVERY OF THE PLUTONIUM. THE VAULT WALLS WERE CONSTRUCTED 14.5 FEET THICK. BUILDING 991, IN THE BACKGROUND, WAS THE FIRST OPERATIONAL BUILDING ON SITE (2/1/52). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  1. 7 CFR 15b.18 - Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.18 Existing facilities. (a) Accessibility. A recipient shall operate each assisted program or activity so that when each part is viewed in... results in making its program or activity accessible to qualified handicapped persons. A recipient is not...

  2. 15. View of southeasterly side of transmitter building no. 102 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View of southeasterly side of transmitter building no. 102 with TR in middle and small satcom communication dome lower right. Note site well system building to lower right of transmitter building no. 102 southeast corner. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  3. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  4. 15. Front security entrance to the perimeter acquisition radar building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Front security entrance to the perimeter acquisition radar building, showing rotogates 1 and 2 and entrance door to security operations control center (SOCC), room #108 - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  5. 15. Historic American Buildings Survey E. W. Russell, Photographer, March ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey E. W. Russell, Photographer, March 15, 1936 BLINDS ON FRENCH TYPE DOOR OPENING ON W. REAR PORCH, 2nd STORY, N. SIDE APARTMENT - Augustine Ottenstein House, 207-209 North Jackson Street, Mobile, Mobile County, AL

  6. A laboratory facility for research on wind-driven rain intrusion in building envelope assemblies

    Treesearch

    Samuel V. Glass

    2010-01-01

    Moisture management is critical for durable, energy-efficient buildings. To address the need for research on wind-driven rain intrusion in wall assemblies, the U.S. Forest Products Laboratory is developing a new facility. This paper describes the underlying principle of this facility and its capabilities.

  7. 11 CFR 100.56 - Office building or facility for national party committees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... national party committees. A gift, subscription, loan, advance, or deposit of money or anything of value to a national party committee for the purchase or construction of an office building or facility is a...

  8. 15. Photograph of Architectural Building Plans. Naval Air Station ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photograph of Architectural Building Plans. - Naval Air Station Fallon, 100-man Fallout Shelter, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV

  9. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  10. Educational Building and Facilities in the Asian Region. Bulletin No. 17.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and Oceania.

    Educational facilities analyzed in this bulletin are in the countries of the Republic of Afghanistan, Australia, Bangladesh, India, Japan, Republic of Korea, Malaysia, Nepal, New Zealand, Pakistan, Singapore, Sri Lanka, and Thailand. The first section reviews the historical reasons for different stages of school building development in the…

  11. 15. BUILDING NO. 445, PHYSICS LAB (FORMERLY GUN BAG LOADING), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. BUILDING NO. 445, PHYSICS LAB (FORMERLY GUN BAG LOADING), INTERIOR, FOURTH LEVEL. POWDER HOPPER AT TOP OF ELEVATOR SHAFT. POWDER DISTRIBUTED FROM HERE TO LOADING ROOMS BY TUBES. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  12. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. LPT. Shield test facility test building interior (TAN646). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera facing south. Distant pool contained EBOR reactor; near pool was intended for fuel rod storage. Other post-1970 activity equipment remains in pool. INEEL negative no. HD-40-9-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  14. LPT. Shield test facility test building interior (TAN646). Camera points ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility test building interior (TAN-646). Camera points down into interior of north pool. Equipment on wall is electronical bus used for post-1970 experiment. Personnel ladder at right. INEEL negative no. HD-40-9-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Smart Homes and Buildings Research at the Energy Systems Integration Facility

    ScienceCinema

    Christensen, Dane; Sparn, Bethany; Hannegan, Bryan

    2018-01-16

    Watch how NREL researchers are using the unique capabilities of the Energy Systems Integration Facility (ESIF) to develop technologies that will help the “smart” homes and buildings of the future perform efficiently and communicate effectively with the electricity grid while enhancing occupants' comfort and convenience.

  16. 50 CFR 15.42 - List of foreign qualifying breeding facilities. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.42 List of foreign qualifying breeding facilities. [Reserved] ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false List of foreign qualifying breeding...

  17. 50 CFR 15.42 - List of foreign qualifying breeding facilities. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.42 List of foreign qualifying breeding facilities. [Reserved] ... 50 Wildlife and Fisheries 1 2011-10-01 2011-10-01 false List of foreign qualifying breeding...

  18. 50 CFR 15.42 - List of foreign qualifying breeding facilities. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.42 List of foreign qualifying breeding facilities. [Reserved] ... 50 Wildlife and Fisheries 1 2012-10-01 2012-10-01 false List of foreign qualifying breeding...

  19. 50 CFR 15.42 - List of foreign qualifying breeding facilities. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.42 List of foreign qualifying breeding facilities. [Reserved] ... 50 Wildlife and Fisheries 1 2013-10-01 2013-10-01 false List of foreign qualifying breeding...

  20. 50 CFR 15.42 - List of foreign qualifying breeding facilities. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.42 List of foreign qualifying breeding facilities. [Reserved] ... 50 Wildlife and Fisheries 1 2014-10-01 2014-10-01 false List of foreign qualifying breeding...

  1. Single-Source Responsibility: An Innovative Way to Build College Sports, Fitness and Rec Facilities

    ERIC Educational Resources Information Center

    Wakely, Jim

    2013-01-01

    While schools wrestled with how to build a new athletic facility in the middle of a recession, Tufts University's Athletics and Operations Departments worked with a Massachusetts-based developer called Stanmar Inc. to devise a creative solution to designing, building and financing a new sports and fitness center in just under 24 months. Tufts was…

  2. 1. VIEW LOOKING NORTHWEST AT BUILDING 444 UNDER CONSTRUCTION. ORIGINALLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING NORTHWEST AT BUILDING 444 UNDER CONSTRUCTION. ORIGINALLY CALLED PLANT A, BUILDING 444 WAS ONE OF THE FIRST BUILDINGS CONSTRUCTED AT THE ROCKY FLATS PLANT. (4/15/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  3. Facilities | Buildings | NREL

    Science.gov Websites

    state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency building's energy use and make adjustments. Low-Energy Parking Structure Photo of the parking structure on structure in February 2012. The structure's estimated energy use is 42 kilowatt-hours per parking stall

  4. 105. JOB NO. 1347F, SHEET 15, 1927/1929, ASSEMBLY BUILDING; FORD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    105. JOB NO. 1347-F, SHEET 15, 1927/1929, ASSEMBLY BUILDING; FORD MOTOR COMPANY; MISCELLANEOUS DETAILS - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  5. 49 CFR 191.15 - Transmission systems; gathering systems; and liquefied natural gas facilities: Incident report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under § 191.5 of this part. (b) LNG. Each operator of a liquefied natural gas plant or facility must... liquefied natural gas facilities: Incident report. 191.15 Section 191.15 Transportation Other Regulations...; gathering systems; and liquefied natural gas facilities: Incident report. (a) Transmission or Gathering...

  6. 15. Historic American Buildings Survey, Donald W. Dickensheets, Photographer. April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, Donald W. Dickensheets, Photographer. April 10, 1940. CHURCH AND PATIO (NORTHEAST ELEVATION). - San Xavier del Bac Mission, Mission Road, Tucson, Pima County, AZ

  7. 15. Historic American Buildings Survey Albert S. Burns, Photographer October ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Albert S. Burns, Photographer October 1, 1935. GENERAL VIEW, SOUTH ELEVATION - The Maples, 630 South Carolina Avenue Southeast, Washington, District of Columbia, DC

  8. 21. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 DOOR DETAIL ON 1ST FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  9. 9. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 REAR WALL RAILING (PORCH) SECOND FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  10. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  11. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  12. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  14. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  15. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south end of EBOR helium wing. Camera facing north. Monorail protrudes from upper-level door. Rust marks on concrete wall are from stack. Metal shed is post-1970 addition. INEEL negative no. HD-40-8-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  16. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D&D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D&D plans for the turbine building were prepared from 1979 through 1990. D&D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and the absence of loosemore » contamination, the D&D activities were completed with no radiation exposure to the workers. The D&D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  17. Final report of the decontamination and decommissioning of the BORAX-V facility turbine building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arave, A.E.; Rodman, G.R.

    1992-12-01

    The Boiling Water Reactor Experiment (BORAX)-V Facility Turbine Building Decontamination and Decommissioning (D D) Project is described in this report. The BORAX series of five National Reactor Testing Station (NRTS) reactors pioneered intensive work on boiling water reactor (BWR) experiments conducted between 1953 and 1964. Facility characterization, decision analyses, and D D plans for the turbine building were prepared from 1979 through 1990. D D activities of the turbine building systems were initiated in November of 1988 and completed with the demolition and backfill of the concrete foundation in March 1992. Due to the low levels of radioactivity and themore » absence of loose contamination, the D D activities were completed with no radiation exposure to the workers. The D D activities were performed in a manner that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) remain.« less

  18. 15. Historic American Buildings Survey Theodore Webb, Photographer, Mar. 16, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Theodore Webb, Photographer, Mar. 16, 1934 DETAIL OF WINDOW (EAST RECEPTION ROOM) - Kentucky School for the Blind, 1867 Frankfort Avenue, Louisville, Jefferson County, KY

  19. 15. Historic American Buildings Survey, 1932 measured drawing from old ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, 1932 measured drawing from old Philadelphia Survey, photocopy courtesy of the Free Library of Philadelphia CROSS SECTION AND LONGITUDINAL SECTION. - Woodford, Philadelphia, Philadelphia County, PA

  20. 15. Historic American Buildings Survey California Automobile Association Original: 1932 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey California Automobile Association Original: 1932 Re-photo: January 1940 CONVENTO - VIEW FROM NORTHWEST - Mission San Jose de Guadalupe, Mission & Washington Boulevards, Fremont, Alameda County, CA

  1. 15. Historic American Buildings Survey Alex Bush, Photographer, April 8, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Alex Bush, Photographer, April 8, 1935 FIREPLACE IN NORTH EAST ROOM ON SECOND FLOOR - Old Southern University, University Avenue (College Street), Greensboro, Hale County, AL

  2. 10. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 DETAIL OF REAR S. E. GROUND FLOOR WINDOW - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  3. 20. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 CEILING TREATMENT IN S. W. ROOM (DINING ROOM) - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  4. [Provision of building maintenance services in healthcare facilities].

    PubMed

    Amorim, Gláucia Maria; Quintão, Eliana Cardoso Vieira; Martelli Júnior, Hercílio; Bonan, Paulo Rogério Ferreti

    2013-01-01

    The scope of this paper was to evaluate the provision of building maintenance services in health units, by means of a descriptive, quantitative and cross-sectional study, considering the five types of facilities (Primary Health, Emergency, Specialty, Hospital and Mental Health Units). The research was approved by the Research Ethics Comittee of FHEMIG with the Terms of Agreement signed with the Unified Health System of Betim. Comparative analysis was conducted by checking the requirements of "Physical-Functional Structure Management" of the "Brazilian Hospital Accreditation Manual" of the National Accreditation Organization. Nonconformities were noted in the physical-functional management of the health centers, especially the primary health units. The assessment was important, considering that compliance with formal, technical and structural requirements, welfare activities, according to the service organization and appropriate to the profile and complexity, can collaborate to minimize the risks of users. To improve the quality of health care establishments, it is essential that managers, backed by "top management," prioritize financial, human and material resources in planning to ensure compliance with security requirements of users in buildings.

  5. 2. LAUNCH CONTROL SUPPORT BUILDING WEST FRONT AND VEHICLE STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. LAUNCH CONTROL SUPPORT BUILDING WEST FRONT AND VEHICLE STORAGE BUILDING SOUTHWEST FRONT. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  6. 15. Historic American Buildings Survey, Photocopy of c. 1905 photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, Photocopy of c. 1905 photograph from the collection of Mr. Chester Williams, Rome, New York. - Barnes-Mudge House, 115 East Dominick Street, Rome, Oneida County, NY

  7. 15. Historic American Buildings Survey W. N. Manning, Photographer, April ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey W. N. Manning, Photographer, April 3, 1934. MANTEL AND OVERMANTEL. - N.W. ROOM - LIVING ROOM - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  8. 16. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 CEILING DETAIL IN N. W. ROOM, 1ST FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  9. 15. INTERIOR VIEW TO THE NORTHEAST OF EQUIPMENT IN ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR VIEW TO THE NORTHEAST OF EQUIPMENT IN ROOM 4, EQUIPMENT AND GENERATOR ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV

  10. 15. Photocopy of Sheet 1 of Building Plan R41A, (USDA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of Sheet 1 of Building Plan R4-1A, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRONT ELEVATION AND FLOOR PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID

  11. 15. Historic American Buildings Survey W. N. Manning, Photographer, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey W. N. Manning, Photographer, January 26, 1935 FRONT AND SIDE VIEW OF OLD STORE, S.E. - Freeman-Caver-Christian House, Upper Friendship Road, Oxford, Calhoun County, AL

  12. 14. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 TREATMENT OF CEILING IN CENTER OF HALL, 1ST FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  13. 15. Historic American Buildings Survey Alex Bush, Photographer, March 24, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Alex Bush, Photographer, March 24, 1937 LOOKING NORTH IN CROSS HALL, SECOND FLOOR - Colonel Joseph R. Hawthorne House, Broad Street (County Road 59), Pine Apple, Wilcox County, AL

  14. 15. CAR DUMP BUILDING, DETAIL SHOWING GRATES OVER COAL BINS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. CAR DUMP BUILDING, DETAIL SHOWING GRATES OVER COAL BINS AND CABLES UNDER CAR DUMP CONTROL HOUSE - Pennsylvania Railroad, Canton Coal Pier, Clinton Street at Keith Avenue (Canton area), Baltimore, Independent City, MD

  15. 12. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 DETAIL OF INTERIOR OF DOORWAY AT FRONT OF HALL ON FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  16. 15. Historic American Buildings Survey, Roy Oglesby, Photographer July 9, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, Roy Oglesby, Photographer July 9, 1947 DETAIL OF BEAMS ON WEST WALL OF LODGE, EAST ELEVATION. - Old Fort Randall Church, Right Bank, Missouri River, Pickstown, Charles Mix County, SD

  17. 15. INTERIOR VIEW LOOKING SOUTHWEST OF BUILDING 343 (STORAGE MAGAZINE) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR VIEW LOOKING SOUTHWEST OF BUILDING 343 (STORAGE MAGAZINE) IN STORAGE AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME

  18. 19. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 SLIDING DOORS ON 1ST FLOOR IN N. W. & S. W. ROOMS - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  19. 15. Historic American Buildings Survey Photocopy of 1925 Photograph Taken ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Photocopy of 1925 Photograph Taken For John Eberson, Architect. Original Courtesy Drew Eberson, Stamford, Connecticut ENTRANCE TO MENS' SMOKING ROOM - Grand Riviera Theatre, 9222 Grand River Avenue, Detroit, MI

  20. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  1. 50 CFR 15.41 - Criteria for including facilities as qualifying for imports. [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.41 Criteria for including facilities as qualifying for imports. [Reserved] ...

  2. 50 CFR 15.41 - Criteria for including facilities as qualifying for imports. [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS WILD BIRD CONSERVATION ACT Qualifying Facilities Breeding Exotic Birds in Captivity § 15.41 Criteria for including facilities as qualifying for imports. [Reserved] ...

  3. 15. Historic American Buildings Survey, N. E. Baldwin, Photographer November ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, N. E. Baldwin, Photographer November 1939, COLLECTION OF SHAKER FURNITURE, Gift of New York State Department of Education. - Shaker North Family, Dwelling House, Shaker Road, New Lebanon, Columbia County, NY

  4. 15. Historic American Buildings Survey W. N. Manning, Photographer, July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey W. N. Manning, Photographer, July 18, 1935 TOMB MONUMENT OF COL. JOHN CROWELL, SR. AT FORT MITCHELL, ALABAMA - Crowell-Cantey-Alexander House, State Road 165, Fort Mitchell, Russell County, AL

  5. 15. BUILDING 1: FOURTH FLOOR (West Section), TOP LEVEL OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. BUILDING 1: FOURTH FLOOR (West Section), TOP LEVEL OF TUBS, SOUTH AND WEST WALLS. OPEN METAL BREWER'S STAIR VISIBLE ALONG WEST WALL - Boston Beer Company, 225-249 West Second Street, South Boston, Suffolk County, MA

  6. LPT. Shield test facility assembly and test building (TAN646). East ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646). East facade of ebor helium wing addition. Camera facing west. Note asbestos-cement siding on stair enclosure and upper-level. Concrete siding at lower level. Metal stack. Monorail protrudes from upper level of south wall at left of view. INEEL negative no. HD-40-7-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  7. 15. Historic American Buildings Survey, Plate # 55, 'Wohnhaus Martin, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, Plate # 55, 'Wohnhaus Martin, Buffalo, N. Y. Grundrisse des Haupt und Obergeschosses' in Frank Lloyd Wright Ausgefuhrte Bauten (Berlin: Ernst Wasmuth A. G., 1911), PLAN OF THE FIRST AND SECOND FLOORS, MR. MARTIN'S SISTER'S HOUSE. - Darwin D. Martin House, 125 Jewett Parkway, Buffalo, Erie County, NY

  8. 17. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 TREATMENT OF WALL CORNICE IN BOTH S. W. AND N. W. ROOMS, 1ST FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  9. 18. Historic American Buildings Survey Alex Bush, Photographer, October 15, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Historic American Buildings Survey Alex Bush, Photographer, October 15, 1935 TREATMENT OF CEILING AT TOP IN BOTH S. W. AND N. W. ROOMS - 1ST FLOOR - University of Alabama, President's House, University Boulevard, Tuscaloosa, Tuscaloosa County, AL

  10. VIEW OF BUILDING 778 LOOKING WESTSOUTHWEST. BUILDING 778 HOUSED LAUNDRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF BUILDING 778 LOOKING WEST-SOUTHWEST. BUILDING 778 HOUSED LAUNDRY FACILITIES, SHOWERS, LOCKER ROOMS, SANITARY FACILITIES, AN ELECTRIC SHOP, MACHINE SHOP, SHEET METAL SHOP, AND INERT GAS STORAGE. (12/7/90) - Rocky Flats Plant, Laundry Facility, Northeast quad of Plant between buildings 776/777 & 707, Golden, Jefferson County, CO

  11. Construction of a Solid State Research Facility, Building 3150. Environmental Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration ofmore » the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems.« less

  12. 15. Historic American Buildings Survey E. W. Russell, Photographer, October ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey E. W. Russell, Photographer, October 5, 1936 NORTH WALL OF ATTIC ROOM ON EAST SIDE OF HOUSE, SHOWING REAR DORMER RECESS - J. J. McMahon House, 456 Saint Francis Street, Mobile, Mobile County, AL

  13. Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 basemore » pairs per year, while still retaining its efficiency.« less

  14. 9. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT "C" FACE RADAR SYSTEM EMITTER/ANTENNA. VIEW IS LOOKING SOUTH 30° EAST (NOTE: "C" FACE NOT IN USE AT FACILITY). - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  15. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials.

  16. 14. BUILDING NO. 445, PHYSICS LAB (FORMERLY GUN BAG LOADING), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. BUILDING NO. 445, PHYSICS LAB (FORMERLY GUN BAG LOADING), LOOKING EAST AT SOUTHWEST END OF BUILDING. HVAC EQUIPMENT LOCATED OUTDOORS IN FOREGROUND. DUCTS CONDUCT HOT OR COLD AIR INDOORS. ROUND PIPES ARE INSULATED STEAM LINES. BUILDING NO. 448, ORDNANCE FACILITY, IN BACKGROUND. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  17. Shoreline Erosion and Proposed Control at Experimental Facility 15-Spesutie Island

    DTIC Science & Technology

    2017-09-01

    Island, it is made up of various facilities and ranges designed for weapons testing as well as automotive testing . These ranges belong to the...ARL-SR-0383 ● SEP 2017 US Army Research Laboratory Shoreline Erosion and Proposed Control at Experimental Facility 15–Spesutie...in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents. Citation

  18. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri. Environmental assessment: Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonell, M.M.; Peterson, J.M.

    1991-11-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this timemore » has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impact associated with the proposed action.« less

  19. Designs for Success: Massive Building Project Makes LACCD a Leader in Green Facilities

    ERIC Educational Resources Information Center

    LaVista, Daniel

    2010-01-01

    After a 35-year building hiatus, the nine colleges in the Los Angeles Community College District (LACCD) needed a major facelift. Facilities on LACCD campuses were antiquated and had fallen into disrepair. For years, students voiced dismay, saying their campuses resembled high schools rather than colleges. Inadequate infrastructure drove many…

  20. Evaluation of initial collector field performance at the Langley Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Boyle, R. J.; Jensen, R. N.; Knoll, R. H.

    1977-01-01

    The thermal performance of the solar collector field for the NASA Langley Solar Building Test Facility is given for October 1976 through January 1977. A 1,180 square meter solar collector field with seven collector designs helped to provide hot water for the building heating system and absorption air conditioner. The collectors were arranged in 12 rows with nominally 51 collectors per row. Heat transfer rates for each row were calculated and recorded along with sensor, insolation, and weather data every five minutes using a minicomputer. The agreement between the experimental and predicted collector efficiencies was generally within five percentage points.

  1. Evaluation of initial collector field performance at the Langley Solar Building Test Facility

    NASA Technical Reports Server (NTRS)

    Boyle, R. J.; Knoll, R. H.; Jensen, R. N.

    1977-01-01

    The thermal performance of the solar collector field for the NASA Langley Solar Building Test Facility is given for October 1976 through January 1977. An 1180 square meter solar collector field with seven collector designs helped to provide hot water for the building heating system and absorption air conditioner. The collectors were arranged in 12 rows with nominally 51 collectors per row. Heat transfer rates for each row are calculated and recorded along with sensor, insolation, and weather data every 5 minutes using a mini-computer. The agreement between the experimental and predicted collector efficiencies was generally within five percentage points.

  2. 1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW LOOKING SOUTH AT BUILDING 771 UNDER CONSTRUCTION. BUILDING 771 WAS ONE OF THE FIRST FOUR MAJOR BUILDINGS AT THE ROCKY FLATS PLANT, BUILDING 771 WAS ORIGINALLY THE PRIMARY FACILITY FOR PLUTONIUM OPERATIONS. (5/29/52) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  3. 15. Historic American Buildings Survey Russell Jones, Photographer April 1959 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey Russell Jones, Photographer April 1959 REAR (EAST) AND LEFT (NORTH) ELEVATIONS - Southeast Area Survey, Sixth & G Streets (Synagogue), 132-144 & 900-905 Eleventh Street (Row Houses), 215 Second Street (House), Seventh & G Streets (School), 214 First Street (House), Washington, District of Columbia, DC

  4. 15. BUILDING 324 INTERIOR, MASTER BEDROOM, FROM SOUTHEASTERN CORNER OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. BUILDING 324 INTERIOR, MASTER BEDROOM, FROM SOUTH-EASTERN CORNER OF ROOM, LOOKING NORTHWEST, WITH ENTRY FROM HALLWAY, ENTRY TO BATH AND CLOTHES CLOSET IN SEQUENCE FROM LEFT TO RIGHT. - Oakland Naval Supply Center, Commanding Officers Residences, Between E & F Streets, West of Fourth Street, Oakland, Alameda County, CA

  5. 28. View looking north; Botany Worsted Mills building No. 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. View looking north; Botany Worsted Mills building No. 15 at left, Dundee Canal at right - Dundee Canal Industrial Historic District, Beginning at George Street in Passaic & extending north along Dundee Canal approximately 1.2 miles to Canal headgates opposite East Clifton Avenue in Clifton, Passaic, Passaic County, NJ

  6. 36. Historic photo of Building 202 interior, shows shop area ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Historic photo of Building 202 interior, shows shop area with engineers assembling twenty-thousand-pound-thrust rocket engine, December 15, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-49343. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. 15. Historic American Buildings Survey, Bill Engdahl for HedrichBlessing, Photographers, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey, Bill Engdahl for Hedrich-Blessing, Photographers, February, 1979 DRINKING FOUNTAIN WITH CHILDREN AND PAN PIPES IN SPLASH PANEL. - Southern Pacific Railroad Passenger Station, 601 East Madison Street, Brownsville, Cameron County, TX

  8. Test Track Facilities

    DTIC Science & Technology

    1979-12-01

    the surface, together with the effect of flying flintstones results in severe wear to the tyres , brake pipes and all other fittings found underneath a...The building also contains the following test facilities. A 15 m square flat floor used for vehicle measurement accuracy checks, tyre deflections, and... tyres . The course is regularly maintained but dependant on weather, the surface condition may display marked differences. Alpine Course This is a

  9. Building Management Policy and Procedures for Emergency Preparedness and Facility Coordination for the Ernest Orlando Lawrence Berkeley National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EHS Staff

    2003-04-01

    To ensure efficient and effective management of LBNL facilities, LBNL shall assign line managers to perform appropriate work functions. LBNL divisions that are delegated responsibility for the management of buildings shall designate division personnel to serve as --''Building Managers.''

  10. 15. INTERIOR VIEW TO THE WEST OF ROOM 107, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR VIEW TO THE WEST OF ROOM 107, THE HOT STORAGE AND PACKAGING ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  11. 5. LAUNCH CONTROL SUPPORT BUILDING SOUTH SIDE. VIEW TO NORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. LAUNCH CONTROL SUPPORT BUILDING SOUTH SIDE. VIEW TO NORTHWEST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  12. 32. View looking south; Botany Worsted Mills building No. 15 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. View looking south; Botany Worsted Mills building No. 15 at right, Dundee Canal at center, Andrew McLean Company Textile Mill at left - Dundee Canal Industrial Historic District, Beginning at George Street in Passaic & extending north along Dundee Canal approximately 1.2 miles to Canal headgates opposite East Clifton Avenue in Clifton, Passaic, Passaic County, NJ

  13. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    NASA Technical Reports Server (NTRS)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

  14. 9. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF KITCHEN. VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF KITCHEN. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  15. 10. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF BEDROOM. VIEW TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF BEDROOM. VIEW TO SOUTH. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  16. 33 CFR 125.15 - Access to waterfront facilities, and port and harbor areas, including vessels and harbor craft...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and port and harbor areas, including vessels and harbor craft therein. 125.15 Section 125.15....15 Access to waterfront facilities, and port and harbor areas, including vessels and harbor craft....09 to those waterfront facilities, and port and harbor areas, including vessels and harbor craft...

  17. 2. SITE BUILDING 002 SCANNER BUILDING VIEW IS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SITE BUILDING 002 - SCANNER BUILDING - VIEW IS LOOKING NORTH 80° WEST "B" FACE ALONG BUILDING "A" FACE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. 14. VEHICLE STORAGE BUILDING NORTHWEST SIDE AND NORTHEAST REAR. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. VEHICLE STORAGE BUILDING NORTHWEST SIDE AND NORTHEAST REAR. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  19. 11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  20. 6. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF SECURITY OFFICE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF SECURITY OFFICE. VIEW TO WEST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  1. 13. VEHICLE STORAGE BUILDING SOUTHWEST FRONT AND SOUTHEAST SIDE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. VEHICLE STORAGE BUILDING SOUTHWEST FRONT AND SOUTHEAST SIDE. VIEW TO NORTHWEST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  2. 12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  3. 7. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF SECURITY OFFICE. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF SECURITY OFFICE. VIEW TO NORTH. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  4. 11. SITE BUILDING 002 SCANNER BUILDING EVAPORATIVE COOLING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. SITE BUILDING 002 - SCANNER BUILDING - EVAPORATIVE COOLING TOWER SYSTEM IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. 3. LAUNCH CONTROL SUPPORT BUILDING NORTH SIDE AND WEST FRONT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. LAUNCH CONTROL SUPPORT BUILDING NORTH SIDE AND WEST FRONT. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  6. 4. LAUNCH CONTROL SUPPORT BUILDING NORTH SIDE AND EAST REAR. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. LAUNCH CONTROL SUPPORT BUILDING NORTH SIDE AND EAST REAR. VIEW TO SOUTHWEST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  7. 15. Historic American Buildings Survey. Plan of Fort McHenry, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey. Plan of Fort McHenry, by William Tell Poussin, 1819. National Archives, Records of the War Department, Cartographic Section, Record Group 77, drawer 51, sheet 2. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  8. EMS Activations for School-Aged Children From Public Buildings, Places of Recreation or Sport, and Health Care Facilities in Pennsylvania.

    PubMed

    Catherine, Andrew T; Olympia, Robert P

    2016-06-01

    To determine the etiology of emergency medical services (EMS) activations in 2011 to public buildings, places of recreation or sport, and health care facilities involving children aged 5 to 18 years in Pennsylvania. Electronic records documenting 2011 EMS activations as provided by the Pennsylvania Department of Health's Bureau of EMS were reviewed. Data elements (demographics, dispatch complaint, mechanism of injury, primary assessment) from patients aged 5 to 18 years involved in an EMS response call originating from either a public building, a place of recreation and sport, or health care facility were analyzed. A total of 12,289 records were available for analysis. The most common primary assessments from public buildings were traumatic injury, behavioral/psychiatric disorder, syncope/fainting, seizure, and poisoning. The most common primary assessments from places of recreation or sport were traumatic injury, syncope/fainting, altered level of consciousness, respiratory distress, and abdominal pain. The most common primary assessments from health care facilities were behavioral/psychiatric disorder, traumatic injury, abdominal pain, respiratory distress, and syncope/fainting. When examining the mechanism of injury for trauma-related primary assessments, falls were the most common mechanism at all 3 locations, followed by being struck by an object. Of the 1335 serious-incident calls (11% of the total EMS activations meeting inclusion criteria), 61.2% were from public buildings, 14.1% from places of recreation or sport, and 24.7% from health care facilities. Our identification of common EMS dispatch complaints, mechanisms of injury, and primary assessments can be used in the education of staff and preparation of facilities for medical emergencies and injuries where children spend time.

  9. 15. Power copy of drawing, August 21, 1915. POWER PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Power copy of drawing, August 21, 1915. POWER PLANT EXTENSION, GENERAL PLANS. Drawing No. PA-A-36692, Facilities Engineering, Army Materials Technology Laboratory, Watertown, Massachusetts. - Watertown Arsenal, Building No. 60, Arsenal Street, Watertown, Middlesex County, MA

  10. Nanotechnology on a dime: building affordable research facilities

    NASA Astrophysics Data System (ADS)

    DiBattista, Jeff; Clare, Donna; Lynch, David

    2005-08-01

    Designing buildings to house nanotechnology research presents a multitude of well-recognized challenges to architectural and engineering design teams, from environmental control to spatial arrangements to operational functionality. These technical challenges can be solved with relative ease on projects with large budgets: designers have the option of selecting leading-edge systems without undue regard for their expense. This is reflected in the construction cost of many nanotechnology research facilities that run well into the hundreds of millions of dollars. Smaller universities and other institutions need not be shut out of the nanotechnology research field simply because their construction budgets are tens of millions of dollars or less. The key to success for these less expensive projects lies with making good strategic decisions: identifying priorities for the facility in terms of what it will is--and will not--provide to the researchers. Making these strategic decisions puts bounds on the tactical, technical problems that the design team at large must address, allowing them to focus their efforts on the key areas for success. The process and challenges of this strategic decision-making process are examined, with emphasis placed on the types of decisions that must be made and the factors that must be considered when making them. Case study examples of projects undertaken at the University of Alberta are used to illustrate how strategic-level decision-making sets the stage for cutting-edge success on a modest budget.

  11. 2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW LOOKING NORTHEAST AT BUILDING 444 UNDER CONSTRUCTION. BUILDING 444 WAS THE PRIMARY NON-PLUTONIUM MANUFACTURING FACILITY AT THE ROCKY FLATS PLANT. MANUFACTURING PROCESSES COMPLETED IN THIS BUILDING WERE USED TO FABRICATE WEAPONS COMPONENTS AND ASSEMBLIES FOR A VARIETY OF MATERIALS, INCLUDING DEPLETED URANIUM, BERYLLIUM, STAINLESS STEEL, ALUMINUM, AND VANADIUM. (4/25/52) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  12. 15 CFR 716.8 - On-site monitoring of Schedule 1 facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false On-site monitoring of Schedule 1 facilities. 716.8 Section 716.8 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS...

  13. 15 CFR 716.8 - On-site monitoring of Schedule 1 facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false On-site monitoring of Schedule 1 facilities. 716.8 Section 716.8 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS...

  14. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  15. Resolution of sick building syndrome in a high-security facility.

    PubMed

    Hiipakka, D W; Buffington, J R

    2000-08-01

    The main objective of this article is to serve as a case study for other industrial hygiene (IH) professionals' review as a "real world" effort in responding to a facility perceived as "sick" by its occupants. As many industrial hygienists do not have extensive backgrounds in evaluating microbial air contaminants or the mechanical function of building HVAC units, the overall intent is to provide "lessons learned" to IH generalists who may be asked to participate in indoor environmental quality (IEQ) surveys. In September 1994, a suspected case of "sick building syndrome" was investigated (with significant airborne fungal loads confirmed) at a communications center after numerous occupants reported upper respiratory disease and/or allergy-type symptoms. The setting was a two-story structure approximately 30 years old, with a normal occupancy load of 350 to 400 persons. In addition to continual structural modifications, the central HVAC air conditioning systems had poor maintenance histories. Inspection of HVAC components revealed visible fungal growth on air filters and air ducts and in cooling fan condensate drip pans. Fungal air samples were collected with an Anderson N6 air sampler and Sabouraund dextrose agar media. Over a study period of 23 months, three rounds of 26 air samples were collected for 5 minutes each at 28.3 liters/minute airflow. Cultures exhibited fungi such as Aspergillus, Penicillium, Alternaria, and Cladosporium. Certain strains of these fungi produce mycotoxins that may cause a variety of deleterious health effects such as those described by occupants. Initial 1994 airborne fungal concentrations ranged from 85 to 6157 colony forming units (CFUs) per cubic meter of sampled air (CFU/m3). Some investigators have reported fungal concentrations as low as 245 CFU/m3 associated with complaint sites in other buildings. Remediation efforts involved hiring a dedicated mechanic to implement a HVAC preventive maintenance program (including regular

  16. [Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].

    PubMed

    Lee, Geauchul

    2016-04-01

    This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.

  17. 18. SITE BUILDING 002 SCANNER BUILDING VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. SITE BUILDING 002 - SCANNER BUILDING - VIEW OF SITE SECURITY OFFICE ACCESS DOOR FROM EXTERIOR OF OFFICE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. Building a Sustained School Facilities Remedy: Arizona's Innovative Blueprint for Capital Funding. Education, Equity, and the Law. No. 3

    ERIC Educational Resources Information Center

    Hunter, Molly A.

    2010-01-01

    For over ten years, the State of Arizona has implemented an innovative statewide process for financing and building school facilities and purchasing other capital items for its schools. Spawned by an education quality lawsuit, the 1998 Students FIRST Act established the School Facilities Board, which succeeded in helping rural, suburban, and urban…

  19. 24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. 15. VIEW OF THE SPECIAL SHROUDING AND AIR HANDLING SYSTEM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF THE SPECIAL SHROUDING AND AIR HANDLING SYSTEM USED IN BERYLLIUM PRODUCTION. (3/30/89) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  1. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  2. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  3. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  4. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  5. 8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  6. 18. LAUNCH CONTROL SUPPORT BUILDING. 'MISSILE ART' MURAL PAINTED ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. LAUNCH CONTROL SUPPORT BUILDING. 'MISSILE ART' MURAL PAINTED ON INTERIOR WALL OF ELEVATOR SHAFT. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  7. 23. SITE BUILDING 002 SCANNER BUILDING RADAR CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. SITE BUILDING 002 - SCANNER BUILDING - RADAR CONTROL INTERFACE "RCL NO. 2" WITH COMPUTER CONTROL DISC DRIVE UNITS IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. Building a Foundation for Success: How Authorizers Can Help Schools with the Facilities Challenge. Authorizer Issue Brief. Number 2

    ERIC Educational Resources Information Center

    Halsband, Robin; Hassel, Bryan C.

    2004-01-01

    One of the single biggest challenges for a charter school is securing financing for an adequate facility. While a stellar building provides no guarantee that a school will be a success, having adequate facilities that at least meet the needs of an academic program without robbing the budget can go a long way toward creating an environment…

  9. 15. VIEW OF MODULE H, THE HIGH PRESSURE ASSEMBLY AREA. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF MODULE H, THE HIGH PRESSURE ASSEMBLY AREA. PROCESSES IN THIS MODULE OCCURRED UNDER HIGH PRESSURES AND TEMPERATURES. (5/70) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  10. Advanced human-machine interface for collaborative building control

    DOEpatents

    Zheng, Xianjun S.; Song, Zhen; Chen, Yanzi; Zhang, Shaopeng; Lu, Yan

    2015-08-11

    A system for collaborative energy management and control in a building, including an energy management controller, one or more occupant HMIs that supports two-way communication between building occupants and a facility manager, and between building occupants and the energy management controller, and a facility manager HMI that supports two-way communication between the facility manager and the building occupants, and between the facility manager and the energy management controller, in which the occupant HMI allows building occupants to provide temperature preferences to the facility manager and the energy management controller, and the facility manager HMI allows the facility manager to configure an energy policy for the building as a set of rules and to view occupants' aggregated temperature preferences, and the energy management controller determines an optimum temperature range that resolves conflicting occupant temperature preferences and occupant temperature preferences that conflict with the facility manager's energy policy for the building.

  11. Reducing Data Center Loads for a Large-Scale, Low-Energy Office Building: NREL's Research Support Facility (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheppy, M.; Lobato, C.; Van Geet, O.

    2011-12-01

    This publication detailing the design, implementation strategies, and continuous performance monitoring of NREL's Research Support Facility data center. Data centers are energy-intensive spaces that facilitate the transmission, receipt, processing, and storage of digital data. These spaces require redundancies in power and storage, as well as infrastructure, to cool computing equipment and manage the resulting waste heat (Tschudi, Xu, Sartor, and Stein, 2003). Data center spaces can consume more than 100 times the energy of standard office spaces (VanGeet 2011). The U.S. Environmental Protection Agency (EPA) reported that data centers used 61 billion kilowatt-hours (kWh) in 2006, which was 1.5% ofmore » the total electricity consumption in the U.S. (U.S. EPA, 2007). Worldwide, data centers now consume more energy annually than Sweden (New York Times, 2009). Given their high energy consumption and conventional operation practices, there is a potential for huge energy savings in data centers. The National Renewable Energy Laboratory (NREL) is world renowned for its commitment to green building construction. In June 2010, the laboratory finished construction of a 220,000-square-foot (ft{sup 2}), LEED Platinum, Research Support Facility (RSF), which included a 1,900-ft{sup 2} data center. The RSF will expand to 360,000 ft{sup 2} with the opening of an additional wing December, 2011. The project's request for proposals (RFP) set a whole-building demand-side energy use requirement of a nominal 35 kBtu/ft{sup 2} per year. On-site renewable energy generation will offset the annual energy consumption. To support the RSF's energy goals, NREL's new data center was designed to minimize its energy footprint without compromising service quality. Several implementation challenges emerged during the design, construction, and first 11 months of operation of the RSF data center. This document highlights these challenges and describes in detail how NREL successfully overcame them

  12. 2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  13. 5. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 90MM STANDARD LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  14. NREL Buildings Research Video

    ScienceCinema

    None

    2017-12-09

    Through research, the National Renewable Energy Laboratory (NREL) has developed many strategies and design techniques to ensure both commercial and residential buildings use as little energy as possible and also work well with the surroundings. Here you will find a video that introduces the work of NREL Buildings Research, highlights some of the facilities on the NREL campus, and demonstrates these efficient building strategies. Watch this video to see design highlights of the Science and Technology Facility on the NREL campus—the first Federal building to be LEED® Platinum certified. Additionally, the video demonstrates the energy-saving features of NRELs Thermal Test Facility.

  15. 6. SITE BUILDING 002 SCANNER BUILDING AT "A" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 65MM WIDE ANGLE LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  16. AMERICAN STANDARD SPECIFICATIONS FOR MAKING BUILDINGS AND FACILITIES ACCESSIBLE TO, AND USABLE BY, THE PHYSICALLY HANDICAPPED.

    ERIC Educational Resources Information Center

    National Easter Seal Society for Crippled Children and Adults, Chicago, IL.

    THIS STANDARD IS INTENDED TO PROVIDE MINIMUM REQUIREMENTS TO BE USED IN THE CONSTRUCTION OF ALL BUILDINGS AND FACILITIES AND FOR ADOPTION AND ENFORCEMENT BY ADMINISTRATIVE AUTHORITIES IN ORDER TO ALLOW INDIVIDUALS WITH PERMANENT PHYSICAL DISABILITIES TO PURSUE THEIR INTERESTS AND ASPIRATIONS, DEVELOP THEIR TALENTS, AND EXERCISE THEIR SKILLS.…

  17. SOUTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTH. INL PHOTO NUMBER HD-54-15-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  18. 15. MAP OF ALAMEDA SHIPYARD SHOWING PROPOSED ADDITIONAL FACILITIES. United ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. MAP OF ALAMEDA SHIPYARD SHOWING PROPOSED ADDITIONAL FACILITIES. United Engineering Company Ltd., Alameda Shipyard. A site map with all existing structures keyed to an identification legend. Also shows proposed new structures. No architect noted. Drawn by "J.B.H." (John Hudspeth?). Sheet 2. Plan no. 10,528. Scale one inch to 100 feet. November 12, 1943, last revised 1/18/44. pencil on vellum - United Engineering Company Shipyard, 2900 Main Street, Alameda, Alameda County, CA

  19. 25. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1930 ZULU TIME, 26 OCTOBER, 1999. MWOC SCREEN ALSO SHOWS RADAR "FACE A" AND "FACE B" ACTIVE STATUS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. 10. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT SOUTHWEST CORNER "B" FACE AND "C" FACE ON WEST AND EVAPORATIVE COOLING TOWER AT NORTH. VIEW IS LOOKING NORTH 45° EAST. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. 19. SITE BUILDING 002 SCANNER BUILDING AIR POLICE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. SITE BUILDING 002 - SCANNER BUILDING - AIR POLICE SITE SECURITY OFFICE WITH "SITE PERIMETER STATUS PANEL" AND REAL TIME VIDEO DISPLAY OUTPUT FROM VIDEO CAMERA SYSTEM AT SECURITY FENCE LOCATIONS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. 34. SITE BUILDING 002 SCANNER BUILDING ROOM 105 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. SITE BUILDING 002 - SCANNER BUILDING - ROOM 105 - CHILLER ROOM, SHOWING SINGLE COMPRESSOR, LIQUID CHILLERS AND "CHILLED WATER RETURN", COOLING TOWER 'TOWER WATER RETURN" AND 'TOWER WATER SUPPLY" LINES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. Science Facilities Bibliography.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…

  4. Advanced building energy management system demonstration for Department of Defense buildings.

    PubMed

    O'Neill, Zheng; Bailey, Trevor; Dong, Bing; Shashanka, Madhusudana; Luo, Dong

    2013-08-01

    This paper presents an advanced building energy management system (aBEMS) that employs advanced methods of whole-building performance monitoring combined with statistical methods of learning and data analysis to enable identification of both gradual and discrete performance erosion and faults. This system assimilated data collected from multiple sources, including blueprints, reduced-order models (ROM) and measurements, and employed advanced statistical learning algorithms to identify patterns of anomalies. The results were presented graphically in a manner understandable to facilities managers. A demonstration of aBEMS was conducted in buildings at Naval Station Great Lakes. The facility building management systems were extended to incorporate the energy diagnostics and analysis algorithms, producing systematic identification of more efficient operation strategies. At Naval Station Great Lakes, greater than 20% savings were demonstrated for building energy consumption by improving facility manager decision support to diagnose energy faults and prioritize alternative, energy-efficient operation strategies. The paper concludes with recommendations for widespread aBEMS success. © 2013 New York Academy of Sciences.

  5. Building Toxic Metal Characterization and Decontamination Report: Area 6, Building 914

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Industrial Hygiene

    2011-08-15

    The purpose of this report is to outline the toxic metal characterization and decontamination efforts in Area 6, Building 914. This includes the initial building inspection, the hotspot sampling, results/findings, building cleanup, and the verification sampling. Building 914 is a steel light frame building that was constructed in 1992. It is about 16,454 square feet, and five employees are assigned to this building. According to the building's floor plan blueprints, it could be inferred that this building was once a Wiremen/Lineman shop. In 2002-2004, the National Nuclear Security Administration Nevada Site Office embarked on a broad characterization of beryllium (Be)more » surface concentrations throughout the North Las Vegas Facility, the Nevada National Security Site (NNSS), and ancillary facilities like the Special Technologies Laboratory, Remote Sensing Laboratory, etc. Building 914 was part of this characterization. The results of the 2002 study illustrated that the metal housekeeping limits were within acceptable limits and from a Be standpoint, the building was determined to be fit for occupancy. On March 2, 2011, based on a request from Building 914 users, National Security Technologies, LLC (NSTec) Industrial Hygiene (IH) collected bulk samples from the southwest corner of Building 914 at heights above 6 feet where black dust had been noticed on this particular wall. IH conducted surface swipe sampling of the area and analyzed the samples for toxic metals, namely, beryllium (Be), cadmium (Cd), chromium (Cr), lead (Pb), and manganese (Mn). The sample results indicated values two to four times above the housekeeping threshold for Be, Cd, Cr, Pb, and Mn. Subsequently, the facility was closed and posted; the necessary personnel were notified; and controls were instituted for ingress and egress of the building. On March 17, 2011, IH performed an extensive sampling event involving the entire warehouse in accordance with NSTec Organization Procedure OP-P250

  6. 20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  7. Building Awards | NREL

    Science.gov Websites

    Mountain campus is designed to meet the Gold or Platinum standards of the U.S. Green Building Council's Research Facility. South Site Entrance Building South Site Entrance Building 2013 U.S. Green Buildings Building Awards Building Awards NREL's high-performance buildings are sustainability models for the

  8. 26. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1945 ZULU TIME, 26 OCTOBER, 1999. "SPACE TRACK BOARD" DATA SHOWING ITEMS #16609 MIR (RUSSIA) AND #25544 ISS (INTERNATIONAL SPACE STATION) BEING TRACKED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  9. Indoor Lighting Facilities

    NASA Astrophysics Data System (ADS)

    Matsushima, Koji; Saito, Yoshinori; Ichikawa, Shigenori; Kawauchi, Takao; Tanaka, Tsuneo; Hirano, Rika; Tazuke, Fuyuki

    According to the statistics by the Ministry of Land, Infrastructure and Transport, the total floor space of all building construction started was 188.87 million m2 (1.5% increase y/y), marking the fourth straight year of increase. Many large-scale buildings under construction in central Tokyo become fully occupied by tenants before completion. As for office buildings, it is required to develop comfortable and functional office spaces as working styles are becoming more and more diversified, and lighting is also an element of such functionalities. The total floor space of construction started for exhibition pavilions, multipurpose halls, conference halls and religious architectures decreased 11.1% against the previous year. This marked a decline for 10 consecutive years and the downward trend continues. In exhibition pavilions, the light radiation is measured and adjusted throughout the year so as not to damage the artworks by lighting. Hospitals, while providing higher quality medical services and enhancing the dwelling environment of patients, are expected to meet various restrictions and requirements, including the respect for privacy. Meanwhile, lighting designs for school classrooms tend to be homogeneous, yet new ideas are being promoted to strike a balance between the economical and functional aspects. The severe economic environment continues to be hampering the growth of theaters and halls in both the private and public sectors. Contrary to the downsizing trend of such facilities, additional installations of lighting equipment were conspicuous, and the adoption of high efficacy lighting appliances and intelligent function control circuits are becoming popular. In the category of stores/commercial facilities, the construction of complex facilities is a continuing trend. Indirect lighting, high luminance discharge lamps with excellent color rendition and LEDs are being effectively used in these facilities, together with the introduction of lighting designs

  10. Facilities | Bioenergy | NREL

    Science.gov Websites

    Facilities Facilities At NREL's state-of-the-art bioenergy research facilities, researchers design options. Photo of interior of industrial, two-story building with high-bay, piping, and large processing

  11. 29. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) AT SYSTEM LAYOUT GRID 17. GENERAL OBLIQUE VIEW OF "A" FACE INTERIOR SHOWING RADAR EMITTER/ANTENNA INTERFACE ELECTRONICS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  12. 21. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT DISC STORAGE SYSTEMS A AND B (A OR B ARE REDUNDANT SYSTEMS), ONE MAINFRAME COMPUTER ON LINE, ONE ON STANDBY WITH STORAGE TAPE, ONE ON STANDBY WITHOUT TAPE INSTALLED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. The NASA Langley building solar project and the supporting Lewis solar technology program

    NASA Technical Reports Server (NTRS)

    Ragsdale, R. G.; Namkoong, D.

    1974-01-01

    The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

  14. Learning to Share: Australia's "Building the Education Revolution" and Shared Schools

    ERIC Educational Resources Information Center

    McShane, Ian

    2012-01-01

    This article analyses the conceptual and policy contexts of the Australian government's "Building the Education Revolution" (BER) programme. This $A15 billion commitment to renewing school facilities is the Australian government's largest single measure of economic stimulus in response to the recent global financial crisis. Public debate…

  15. 58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. MILL BUILDING (BUILDING 1558): VIEW FROM SOUTHWEST, WITH V-2 ASSEMBLY BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  16. 56. V2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. V-2 ASSEMBLY BUILDING (BUILDING 1538): VIEW FROM NORTHEAST, WITH MILL BUILDING IN BACKGROUND AT FAR RIGHT - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  17. Building 1100--NASA

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Building 1100 is the NASA administrative building. Services located in this building include two banks, a post office, barber shop, cafeteria, snack bar, travel agency, dry cleaners, the NASA Exchange retail store and medical facilities for employees.

  18. U.S.– India Joint Center for Building Energy Research and Development (CBERD) Caring for the Energy Health of Healthcare Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Reshma; Mathew, Paul; Granderson, Jessica

    The U.S.-India Joint Center for Building Energy Research & Development (CBERD), created through the Partnership to Accelerate Clean Energy (PACE) agreement between the United States and India, is a research and development (R&D) center with over 30 institutional and industry partners from both nations. This five-year presidential initiative is jointly funded by the U.S. Department of Energy and the Government of India. CBERD aims to build upon a foundation of collaborative knowledge, tools, and technologies, and human capabilities that will increase development of high-performance buildings. To reach this goal, the R&D focuses on energy use reduction throughout the entire lifemore » cycle of buildings—i.e., design, construction, and operations. During the operations phase of buildings, even with best-practice energy-efficient design, actual energy use can be much higher than the design intent. Every day, much of the energy consumed by buildings serves no purpose (Roth et al. 2005). Building energy information systems (EIS) are commercially available systems that building owners and facility managers use to assess their building operations, measure, visualize, analyze, and report energy cost and consumption. Energy information systems can enable significant energy savings by tracking energy use, identifying consumption patterns, and benchmarking performance against similar buildings, thereby identifying improvement opportunities. The CBERD team has identified potential energy savings of approximately 2 quads of primary energy in the United States, while industry building energy audits in India have indicated potential energy savings of up to 30 percent in commercial buildings such as offices. Additionally, the CBERD team has identified healthcare facilities (e.g., hospitals, clinics), hotels, and offices as the three of the highest-growth sectors in India that have significant energy consumption, and that would benefit the most from implementation of EIS.« less

  19. 1. West elevations of barrier (Building 4216/E17) and Monitor Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. West elevations of barrier (Building 4216/E-17) and Monitor Building (4203/E-4). Barrier is built of wood infilled with earth, intended to protect Monitor Building from flying debris should anything at Test Stand 'A' explode. Building 4203/E-4 is built of reinforced concrete; equipment on top of it is cooling tower for refrigeration equipment in Test Stand 'A' machinery room. Electrical utility poles are typical at the facility, and carry 4,800 volts 3-phase alternating current. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Control Center, Edwards Air Force Base, Boron, Kern County, CA

  20. LAFD: TA-15 DARHT Firefighter Facility Familiarization Tour, OJT 53044, Revision 0.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Victor Stephen; Priestley, Terry B.; Maestas, Marvin Manuel

    The Los Alamos National Laboratory (LANL or the Lab) will conduct familiarization tours for the Los Alamos County Fire Department (LAFD) at the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility, TA-15-0312. The purpose of these tours is to orient LAFD firefighters to the DARHT facility layout and hazards. This document provides information and figures to supplement the familiarization tours. The document will be distributed to the trainees at the time of the familiarization tour. A checklist (Attachment A) has also been developed to ensure that all required information is consistently presented to LAFD personnel during the familiarization tours.

  1. 23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 3. Plan no. 10,525. Various scales. March 1, 1943, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA

  2. 22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 2. Plan no. 10,525. Various scales. March 1, 1942, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA

  3. Final cleanup of buildings within in legacy French research facilities: strategy, tools and lessons learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Goaller, C.; Doutreluingne, C.; Berton, M.A.

    2007-07-01

    This paper describes the methodology followed by the French Atomic Energy Commission (CEA) to decommission the buildings of former research facilities for demolition or possible reuse. It is a well known fact that the French nuclear safety authority has decided not to define any general release level for the decommissioning of nuclear facilities, thus effectively prohibiting radiological measurement-driven decommissioning. The decommissioning procedure therefore requires an intensive in-depth examination of each nuclear plant. This requires a good knowledge of the past history of the plant, and should be initiated as early as possible. The paper first describes the regulatory framework recentlymore » unveiled by the French Safety Authority, then, reviews its application to ongoing decommissioning projects. The cornerstone of the strategy is the definition of waste zoning in the buildings to segregate areas producing conventional waste from those generating nuclear waste. After dismantling, suitable measurements are carried out to confirm the conventional state of the remaining walls. This requires low-level measurement methods providing a suitable detection limit within an acceptable measuring time. Although this generally involves particle counting and in-situ low level gamma spectrometry, the paper focuses on y spectrometry. Finally, the lessons learned from ongoing projects are discussed. (authors)« less

  4. VIEW LOOKING SOUTHWEST AT BUILDING 122 DURING CONSTRUCTION. BUILDING 122, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW LOOKING SOUTHWEST AT BUILDING 122 DURING CONSTRUCTION. BUILDING 122, THE EMERGENCY MEDICAL BUILDING, WAS ONE OF THE ORIGINAL STRUCTURES AT THE ROCKY FLATS PLANT. (5/29/52) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  5. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  6. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    NASA Technical Reports Server (NTRS)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) was constructed to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test the performance of a complete solar heating and cooling system, (3) investigate component interactions, and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is printed along with the objectives, test approach, expected system performance, and some preliminary results.

  7. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (2) Each type of equipment the facility proposes to test. (3) A description of the facility's... concentrations and the values obtained by the facility with their equipment. The value of X d for the 12... conduct approval tests— (1) A facility must have the management organization, equipment for conducting...

  8. Mitigation of CO2 emissions from the EU-15 building stock: beyond the EU Directive on the Energy Performance of Buildings.

    PubMed

    Petersdorff, Carsten; Boermans, Thomas; Harnisch, Jochen

    2006-09-01

    GOAL SCOPE AND BACKGROUND: The European Directive on Energy Performance of Buildings which came into force 16 December 2002 will be implemented in the legislation of Member States by 4 January 2006. In addition to the aim of improving the overall energy efficiency of new buildings, large existing buildings will become a target for improvement, as soon as they undergo significant renovation. The building sector is responsible for about 40% of Europe's total end energy consumption and hence this Directive is an important step for the European Union in order that it should reach the level of saving required by the Kyoto Agreement. In this the EU is committed to reduce CO2 emissions relative to the base year of 1990 by 8 per cent, by 2010. But what will be the impact of the new Directive, how large could be the impacts of extending the obligation for energy efficiency retrofitting towards smaller buildings? Can improvement of the insulation offset or reduce the growing energy consumption from the increasing installation of cooling installations? EURIMA, the European Insulation Manufacturers Association and EuroACE, the European Alliance of Companies for Energy Efficiency in Buildings, asked Ecofys to address these questions. The effect of the EPB Directive on the emissions associated with the heating energy consumption of the total EU 15 building stock has been examined in a model calculation, using the Built Environment Analysis Model (BEAM), which was developed by Ecofys to investigate energy saving measures in the building stock. The great complexity of the EU-15 building stock had to be simplified by examining five standard buildings with eight insulation standards, which are assigned to building age and renovation status. Furthermore, three climatic regions (cold, moderate, warm) were distinguished for the calculation of the heating energy demand. This gave a basic 210 building types for which the heating energy demand and CO2 emissions from heating were

  9. View showing base of Building 70021 with Building 70022 in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View showing base of Building 70021 with Building 70022 in background, facing southeast - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  10. Detail view of base of Building 70021, showing Building 70022 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail view of base of Building 70021, showing Building 70022 (background), facing southeast - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  11. PBF Reactor Building (PER620). Camera in second basement near subpile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera in second basement near sub-pile room (directly below reactor vessel). Door and penetrations lead to sub-pile room. Date: August 15, 1969. Photographer: Larry Page. INEEL negative no. 69-4310 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. View of hoist southeast of Building 70022. facing northwest. Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of hoist southeast of Building 70022. facing northwest. Building 70022 is in background - Naval Ordnance Test Station Inyokern, Randsburg Wash Facility Target Test Towers, Tower Road, China Lake, Kern County, CA

  13. SOLAR PANELS ON HUDSON COUNTY FACILITIES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BARRY, KEVIN

    2014-06-06

    This project involved the installation of an 83 kW grid-connected photovoltaic system tied into the energy management system of Hudson County's new 60,000 square foot Emergency Operations and Command Center and staff offices. Other renewable energy features of the building include a 15 kW wind turbine, geothermal heating and cooling, natural daylighting, natural ventilation, gray water plumbing system and a green roof. The County intends to seek Silver LEED certification for the facility.

  14. 21 CFR 225.20 - Buildings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.20 Buildings. (a) The location, design, construction, and physical size of the buildings and other production facilities are factors important to the manufacture of medicated feed. The features of...

  15. 15 CFR 807.1 - Public Reference Facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) BUREAU OF ECONOMIC ANALYSIS, DEPARTMENT OF COMMERCE PUBLIC INFORMATION § 807.1 Public Reference Facility. The Public Reference Facility of the Bureau of Economic Analysis is located in room B7 of the Tower...

  16. 15 CFR 807.1 - Public Reference Facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) BUREAU OF ECONOMIC ANALYSIS, DEPARTMENT OF COMMERCE PUBLIC INFORMATION § 807.1 Public Reference Facility. The Public Reference Facility of the Bureau of Economic Analysis is located in room B7 of the Tower...

  17. 15 CFR 807.1 - Public Reference Facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) BUREAU OF ECONOMIC ANALYSIS, DEPARTMENT OF COMMERCE PUBLIC INFORMATION § 807.1 Public Reference Facility. The Public Reference Facility of the Bureau of Economic Analysis is located in room B7 of the Tower...

  18. Indoor Athletic Facilities.

    ERIC Educational Resources Information Center

    Fleming, E. Scott

    2000-01-01

    Examines the concept of shared-use facilities to help financially support and meet the demand for athletic facilities. Shared-use considerations are explored including cost sharing of ongoing operations, aesthetics, locker rooms, support facilities, parking and site access, and building access and security. (GR)

  19. PBF Reactor Building (PER620). Camera faces north into highbay/reactor pit ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces north into high-bay/reactor pit area. Inside from for reactor enclosure is in place. Photographer: John Capek. Date: March 15, 1967. INEEL negative no. 67-1769 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  20. Building Air Quality Guide: A Guide for Building Owners and Facility Managers

    EPA Pesticide Factsheets

    The Building Air Quality, developed by the EPA and the National Institute for Occupational Safety and Health, provides practical suggestions on preventing, identifying, and resolving indoor air quality (IAQ) problems in public and commercial buildings.

  1. How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money. Energy-Smart Building Choices.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC.

    This guide addresses contributions that school facility administrators and business officials can make in an effort to reduce operating costs and free up money for capital improvements. The guide explores opportunities available to utilize energy-saving strategies at any stage in a building's life, from its initial design phase through renovation.…

  2. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified

  3. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  4. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  5. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  6. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  7. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  8. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... This is the mean and standard deviation, respectively, of the differences between the known sample... sample analysis, and the materials necessary to perform the tests; (2) Each facility test rig must be of... facilities. (a) Each request for designation as a facility authorized to perform approval tests must be...

  9. The Building Commissioning Handbook.

    ERIC Educational Resources Information Center

    Heinz, John A.; Casault, Rick

    This book discusses building commissioning, which is the process of certifying that a new facility meets the required specifications. As buildings have become more complex, the traditional methods for building start-up and final acceptance have been proven inadequate, and building commissioning has been developed, which often necessitates the use…

  10. The Effect of Body Build and BMI on Aerobic Test Performance in School Children (10-15 Years)

    PubMed Central

    Slinger, Jantine; Verstappen, Frans; Breda, Eric Van; Kuipers, Harm

    2006-01-01

    Body Mass Index (BMI) has often questionably been used to define body build. In the present study body build was defined more specifically using fat free mass index (FFMI = fat free mass normalised to the stature) and fat mass index (FMI = fat mass normalised to stature). The body build of an individual is ‘solid’ in individuals with a high FFMI for their FMI and is ‘slender’ in individuals with a low FFMI relative to their FMI. The aim of the present study was to investigate the association between aerobic test performance and body build defined as solid, average or slender in 10 to 15 year old children. Five-hundred-and-two children (53% boys) aged 10 to 15 years of age were included in the study. Aerobic test performance was estimated with an incremental cycle ergometer protocol and a shuttle run test. BMI and percentage fat (by skin folds) were determined to calculate FMI and FFMI. After adjustment for differences in age, gender and body mass the solid group achieved a significantly higher maximal power output (W) and power output relative to body mass (W/kg) during the cycle test (p < 0.05) and a higher shuttle-run score (p < 0.05) compared to the slender group. The power output relative to FFM (W/kg FFM) was comparable (p > 0.05) between different body build groups. This study showed that body build is an important determinant of the aerobic test performance. In contrast, there were no differences in aerobic test performance per kilogramme FFM over the body build groups. This suggests that the body build may be determined by genetic predisposition. Key Points Children with a solid body build perform better in aerobic exercise tests than slender children. The power output relative to fat free mass was comparable in the solid, slender and average group. Besides body composition, body build should be considered related to other performance measurements. PMID:24357967

  11. Evolution of the Building Management System in the INFN CNAF Tier-1 data center facility.

    NASA Astrophysics Data System (ADS)

    Ricci, Pier Paolo; Donatelli, Massimo; Falabella, Antonio; Mazza, Andrea; Onofri, Michele

    2017-10-01

    The INFN CNAF Tier-1 data center is composed by two different main rooms containing IT resources and four additional locations that hosts the necessary technology infrastructures providing the electrical power and cooling to the facility. The power supply and continuity are ensured by a dedicated room with three 15,000 to 400 V transformers in a separate part of the principal building and two redundant 1.4MW diesel rotary uninterruptible power supplies. The cooling is provided by six free cooling chillers of 320 kW each with a N+2 redundancy configuration. Clearly, considering the complex physical distribution of the technical plants, a detailed Building Management System (BMS) was designed and implemented as part of the original project in order to monitor and collect all the necessary information and for providing alarms in case of malfunctions or major failures. After almost 10 years of service, a revision of the BMS system was somewhat necessary. In addition, the increasing cost of electrical power is nowadays a strong motivation for improving the energy efficiency of the infrastructure. Therefore the exact calculation of the power usage effectiveness (PUE) metric has become one of the most important factors when aiming for the optimization of a modern data center. For these reasons, an evolution of the BMS system was designed using the Schneider StruxureWare infrastructure hardware and software products. This solution proves to be a natural and flexible development of the previous TAC Vista software with advantages in the ease of use and the possibility to customize the data collection and the graphical interfaces display. Moreover, the addition of protocols like open standard Web services gives the possibility to communicate with the BMS from custom user application and permits the exchange of data and information through the Web between different third-party systems. Specific Web services SOAP requests has been implemented in our Tier-1 monitoring system in

  12. Building-level analyses to prospectively detect influenza outbreaks in long-term care facilities: New York City, 2013-2014.

    PubMed

    Levin-Rector, Alison; Nivin, Beth; Yeung, Alice; Fine, Annie D; Greene, Sharon K

    2015-08-01

    Timely outbreak detection is necessary to successfully control influenza in long-term care facilities (LTCFs) and other institutions. To supplement nosocomial outbreak reports, calls from infection control staff, and active laboratory surveillance, the New York City (NYC) Department of Health and Mental Hygiene implemented an automated building-level analysis to proactively identify LTCFs with laboratory-confirmed influenza activity. Geocoded addresses of LTCFs in NYC were compared with geocoded residential addresses for all case-patients with laboratory-confirmed influenza reported through passive surveillance. An automated daily analysis used the geocoded building identification number, approximate text matching, and key-word searches to identify influenza in residents of LTCFs for review and follow-up by surveillance coordinators. Our aim was to determine whether the building analysis improved prospective outbreak detection during the 2013-2014 influenza season. Of 119 outbreaks identified in LTCFs, 109 (92%) were ever detected by the building analysis, and 55 (46%) were first detected by the building analysis. Of the 5,953 LTCF staff and residents who received antiviral prophylaxis during the 2013-2014 season, 929 (16%) were at LTCFs where outbreaks were initially detected by the building analysis. A novel building-level analysis improved influenza outbreak identification in LTCFs in NYC, prompting timely infection control measures. Copyright © 2015 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  13. 6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING CONSTRUCTION WAS HARDENED TO WITHSTAND THE FORCES IMPOSED BY A DESIGN-BASIS EARTHQUAKE OR TORNADO. (7/1/74) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  14. SUNREL Applications | Buildings | NREL

    Science.gov Websites

    used by the building design team for energy analysis. Zion National Park Visitor's Center Grand Canyon National Park Bookstore NREL Thermal Test Facility NREL Wind Site Entrance Building DPD Office Building Performance Analysis of a High-Mass Residential Building Van Geet residence The Van Geet Off-Grid Home: An

  15. Building Condition and Suitability Evaluation Manual.

    ERIC Educational Resources Information Center

    MGT of America, Inc., Tallahassee, FL.

    This educational facility evaluation manual contains the overall building condition rating form and the supporting check sheets which have been field tested in several states and, where appropriate, modified for use in the Idaho School Facilities Needs Assessment. The exterior building condition form examines the foundation, structure, walls,…

  16. Wake Shield Facility Modal Survey Test in Vibration Acoustic Test Facility

    NASA Image and Video Library

    1991-10-09

    Astronaut Ronald M. Sega stands beside the University of Houston's Wake Shield Facility before it undergoes a Modal Survey Test in the Vibration and Acoustic Test Facility Building 49, prior to being flown on space shuttle mission STS-60.

  17. 30. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) INTERIOR BETWEEN GRIDS 17-A1 AND 18-A1, SHOWING REAR OF RADAR EMITTER ELECTRONIC INTERFACE TERMINAL NO. 3147-20, "RECEIVER TRANSMITTER RADAR" MODULE. VIEW IS ALSO SHOWING BUILDING FIRE STOP MATERIAL AT BOTTOM OF FLOOR. NOTE: WALL SLOPES BOTTOM TO TOP INWARD; STRUCTURAL ELEMENT IN FOREGROUND. VIEW ALSO SHOWS PIPING GRID OF CHILLED WATER LINES FOR ELECTRONIC SYSTEMS COOLING. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. Fayette County Better Buildings Initiative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Capella, Arthur

    The Fayette County Better Buildings Initiative represented a comprehensive and collaborative approach to promoting and implementing energy efficiency improvements. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. The ultimate goal of Fayette County’s Better Buildings Initiative was to implement a total of 1,067 residential energy efficiency retrofits with a minimum 15% estimated energy efficiency savings per unit. Program partners included: United States Department of Energy, Allegheny Power, and Private Industry Council of Westmoreland-Fayette, Fayette County Redevelopment Authority, and various local partners.more » The program was open to any Fayette County residents who own their home and meet the prequalifying conditions. The level of assistance offered depended upon household income and commitment to undergo a BPI – Certified Audit and implement energy efficiency measures, which aimed to result in at least a 15% reduction in energy usage. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. Additionally, the program had components that involved recruitment and training for employment of persons in the energy sector (green jobs), as well as marketing and implementation of a commercial or community facilities component. The residential component of Fayette County’s Better Buildings Initiative involved a comprehensive approach, providing assistance to low- moderate- and market-rate homeowners. The initiative will also coordinate activities with local utility providers to further incentivize energy efficiency improvements among qualifying homeowners. The commercial component of Fayette County’s Better Building Initiative involved

  19. AERIAL VIEW OF BUILDING 460, LOOKING NORTHEAST. THE BUILDING WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    AERIAL VIEW OF BUILDING 460, LOOKING NORTHEAST. THE BUILDING WAS CONSTRUCTED TO CONSOLIDATE ALL NON-NUCLEAR MANUFACTURING AT THE ROCKY FLATS PLANT INTO ONE FACILITY. (6/13/85) - Rocky Flats Plant, Stainless Steel & Non-Nuclear Components Manufacturing, Southeast corner of intersection of Cottonwood & Third Avenues, Golden, Jefferson County, CO

  20. Florida Educational Facilities, 1996.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1996. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  1. Florida Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1997. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  2. Florida Educational Facilities, 1998.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document contains information, photographs, and floor plans of many of Florida's new elementary through high school facilities occupied in 1998. Each entry lists the facility's type, building size, student capacity, and general structural information. Also provided is information on the facility's total construction cost; the architects and…

  3. Credit BG. Northeast and northwest facades of Building 4496 (Security ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. Northeast and northwest facades of Building 4496 (Security Facility) as seen when looking south (178°) from entrance to secured area. The Control Tower (Building 4500) appears in background. The Security Facility is part of the secured Building 4505 complex - Edwards Air Force Base, North Base, Security Facility, Northeast of A Street, Boron, Kern County, CA

  4. Environmental practices for biomedical research facilities.

    PubMed Central

    Medlin, E L; Grupenhoff, J T

    2000-01-01

    As a result of the Leadership Conference on Biomedical Research and the Environment, the Facilities Committee focused its work on the development of best environmental practices at biomedical research facilities at the university and independent research facility level as well as consideration of potential involvement of for-profit companies and government agencies. The designation "facilities" includes all related buildings and grounds, "green auditing" of buildings and programs, purchasing of furnishings and sources, energy efficiency, and engineering services (lighting, heating, air conditioning), among other activities. The committee made a number of recommendations, including development of a national council for environmental stewardship in biomedical research, development of a system of green auditing of such research facilities, and creation of programs for sustainable building and use. In addition, the committee recommended extension of education and training programs for environmental stewardship, in cooperation with facilities managers, for all research administrators and researchers. These programs would focus especially on graduate fellows and other students, as well as on science labs at levels K--12. PMID:11121360

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  6. Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee

    DTIC Science & Technology

    2006-02-01

    Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A

  7. Identifying critical success factors (CSFs) of Facilities Management (FM) in non-low cost high-rise residential buildings

    NASA Astrophysics Data System (ADS)

    Dahlan, F. M.; Zainuddin, A.

    2018-02-01

    Critical success factors (CSFs) are important key areas of activity that must be performed well in any Facilities Management (FM) organisation to achieve its missions, objectives or goals. Before implementing CSFs, an FM organisation must identify the key areas where things must be done properly to enable the business to flourish. Although many performance measurements in FM organisation have been discussed in previous research, not much research has been done on CSFs from the perspective of FM business in non-low cost high-rise residential buildings. The purpose of this study is to develop a methodology in developing the CSFs group and CSFs for FM organisation in non-low cost residential buildings. This research will involve three (3) phases of research strategy to achieve the objective of this research.

  8. 42. CAPE COD AIR STATION PAVE PAWS FACILITY SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE AT 46T DAY OF STEEL CONSTRUCTION. "BUILDING TOPPED OFF, 7 JULY, 1974. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  9. 9 CFR 354.220 - Buildings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Buildings. 354.220 Section 354.220... CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF Buildings and Plant Facilities § 354.220 Buildings. The buildings shall be of sound construction and kept in good repair, and shall be of...

  10. Haselden/RNL - Research Support Facility Documentary

    ScienceCinema

    Haselden, Byron; Baker, Jeff; Glover, Bill; von Luhrte, Rich; Randock, Craig; Andary, John; Macey, Philip; Okada, David

    2017-12-12

    The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designed and built.

  11. Development of the 15 meter diameter hoop column antenna

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The building of a deployable 15-meter engineering model of the 100 meter antenna based on the point-design of an earlier task of this contract, complete with an RF-capable surface is described. The 15 meter diameter was selected so that the model could be tested in existing manufacturing, near-field RF, thermal vacuum, and structural dynamics facilities. The antenna was designed with four offset paraboloidal reflector surfaces with a focal length of 366.85 in and a primary surface accuracy goal of .069 in rms. Surface adjustment capability was provided by manually resetting the length of 96 surface control cords which emanated from the lower column extremity. A detailed description of the 15-meter Hoop/Column Antenna, major subassemblies, and a history of its fabrication, assembly, deployment testing, and verification measurements are given. The deviation for one aperture surface (except the outboard extremity) was measured after adjustments in follow-on tests at the Martin Marietta Near-field Facility to be .061 in; thus the primary surface goal was achieved.

  12. Considerations on Facilities Planning

    ERIC Educational Resources Information Center

    Baule, Steven

    2007-01-01

    Most facilities renovation projects occur because someone at the executive or board level has lobbied successfully for them. Often in public schools, the voters have agreed to the project as well via a building referendum. Therefore, facilities projects are highly visible to the community. Unlike many other issues in schools, facilities projects…

  13. Laboratory 15 kV high voltage solar array facility

    NASA Technical Reports Server (NTRS)

    Kolecki, J. C.; Gooder, S. T.

    1976-01-01

    The laboratory high voltage solar array facility is a photoelectric power generating system. Consisting of nine modules with over 23,000 solar cells, the facility is capable of delivering more than a kilowatt of power. The physical and electrical characteristics of the facility are described.

  14. 2. Credit PSR. The Administration/Shops Building appears here as the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Credit PSR. The Administration/Shops Building appears here as the camera looks east (84°). To the right in the view is the Guard House (Building 4279/E-80) which controls entry to the JPL facility. At left is a warehouse (Building 4287/E88). Overhead utility lines supply alternating current to the facility. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA

  15. RIVER CORRIDOR BUILDINGS 324 & 327 CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.; SMITH, B.A.

    2006-02-09

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D&D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km{sup 2} (1 mi{sup 2})300 Area comprises only a small part of the 1517 km{sup 2} (586 mi{sup 2}) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D&D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Projectmore » for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building.« less

  16. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  17. Building Blueprints: Making Music.

    ERIC Educational Resources Information Center

    College Planning & Management, 2002

    2002-01-01

    Depicts how Cornell University renovated its civil engineering and architecture building to include space for musical performances, teaching, and rehearsals. The article highlights the facility's contemporary design, which also compliments the form and massing of the original building. (GR)

  18. Facility and Laboratory Equipment | Energy Systems Integration Facility |

    Science.gov Websites

    Energy Systems Integration Facility is its infrastructure. In addition to extensive fixed laboratory . Photo of researchers testing building loads and power networks in the Systems Performance Laboratory

  19. Building America Best Practices Series Volume 15: 40% Whole-House Energy Savings in the Hot-Humid Climate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baechler, Michael C.; Gilbride, Theresa L.; Hefty, Marye G.

    2011-09-01

    This best practices guide is the 15th in a series of guides for builders produced by PNNL for the U.S. Department of Energy’s Building America program. This guide book is a resource to help builders design and construct homes that are among the most energy-efficient available, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. With the measures described in this guide, builders in the hot-humid climate can build homes that have whole-house energy savings of 40% over the Building America benchmark with no added overall costs for consumers. The best practices describedmore » in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. Building America builders have found they can build homes that meet these aggressive energy-efficiency goals at no net increased costs to the homeowners. Currently, Building America homes achieve energy savings of 40% greater than the Building America benchmark home (a home built to mid-1990s building practices roughly equivalent to the 1993 Model Energy Code). The recommendations in this document meet or exceed the requirements of the 2009 IECC and 2009 IRC and those requirements are highlighted in the text. Requirements of the 2012 IECC and 2012 IRC are also noted in text and tables throughout the guide. This document will be distributed via the DOE Building America website: www.buildingamerica.gov.« less

  20. Building a Better Learning Environment.

    ERIC Educational Resources Information Center

    Dentch, Matthew

    2000-01-01

    Explains how an environmentally friendly (Green Building) educational facility can be cost effective and enhance student performance. The concepts behind a Green Building, the areas where cost savings are possible, and some examples of realized cost savings are highlighted. Green Building funding issues are discussed. (GR)

  1. Thermal neutron filter design for the neutron radiography facility at the LVR-15 reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soltes, Jaroslav; Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague,; Viererbl, Ladislav

    2015-07-01

    In 2011 a decision was made to build a neutron radiography facility at one of the unused horizontal channels of the LVR-15 research reactor in Rez, Czech Republic. One of the key conditions for operating an effective radiography facility is the delivery of a high intensity, homogeneous and collimated thermal neutron beam at the sample location. Additionally the intensity of fast neutrons has to be kept as low as possible as the fast neutrons may damage the detectors used for neutron imaging. As the spectrum in the empty horizontal channel roughly copies the spectrum in the reactor core, which hasmore » a high ratio of fast neutrons, neutron filter components have to be installed inside the channel in order to achieve desired beam parameters. As the channel design does not allow the instalment of complex filters and collimators, an optimal solution represent neutron filters made of large single-crystal ingots of proper material composition. Single-crystal silicon was chosen as a favorable filter material for its wide availability in sufficient dimensions. Besides its ability to reasonably lower the ratio of fast neutrons while still keeping high intensities of thermal neutrons, due to its large dimensions, it suits as a shielding against gamma radiation from the reactor core. For designing the necessary filter dimensions the Monte-Carlo MCNP transport code was used. As the code does not provide neutron cross-section libraries for thermal neutron transport through single-crystalline silicon, these had to be created by approximating the theory of thermal neutron scattering and modifying the original cross-section data which are provided with the code. Carrying out a series of calculations the filter thickness of 1 m proved good for gaining a beam with desired parameters and a low gamma background. After mounting the filter inside the channel several measurements of the neutron field were realized at the beam exit. The results have justified the expected calculated

  2. Haselden/RNL - Research Support Facility Documentary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haselden, Byron; Baker, Jeff; Glover, Bill

    2010-06-10

    The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designedmore » and built.« less

  3. Defocusing beam line design for an irradiation facility at the TAEA SANAEM Proton Accelerator Facility

    NASA Astrophysics Data System (ADS)

    Gencer, A.; Demirköz, B.; Efthymiopoulos, I.; Yiğitoğlu, M.

    2016-07-01

    Electronic components must be tested to ensure reliable performance in high radiation environments such as Hi-Limu LHC and space. We propose a defocusing beam line to perform proton irradiation tests in Turkey. The Turkish Atomic Energy Authority SANAEM Proton Accelerator Facility was inaugurated in May 2012 for radioisotope production. The facility has also an R&D room for research purposes. The accelerator produces protons with 30 MeV kinetic energy and the beam current is variable between 10 μA and 1.2 mA. The beam kinetic energy is suitable for irradiation tests, however the beam current is high and therefore the flux must be lowered. We plan to build a defocusing beam line (DBL) in order to enlarge the beam size, reduce the flux to match the required specifications for the irradiation tests. Current design includes the beam transport and the final focusing magnets to blow up the beam. Scattering foils and a collimator is placed for the reduction of the beam flux. The DBL is designed to provide fluxes between 107 p /cm2 / s and 109 p /cm2 / s for performing irradiation tests in an area of 15.4 cm × 21.5 cm. The facility will be the first irradiation facility of its kind in Turkey.

  4. PBF Reactor Building (PER620). Camera faces south along west wall. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Camera faces south along west wall. Gap between native lava rock and concrete basement walls is being backfilled and compacted. Wire mesh protects workers from falling rock. Note penetrations for piping that will carry secondary coolant water to Cooling Tower. Photographer: Holmes. Date: June 15, 1967. INEEL negative no. 67-3665 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  5. 15 CFR 716.6 - Facility agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS INITIAL AND... inspection because of the type or amount of chemicals it produces, processes or consumes. (1) Schedule 1... 1 chemicals. (2) Schedule 2 plant sites. The USNA will ensure that such facility agreements are...

  6. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. Current Concerns for Austrian School Facilities.

    ERIC Educational Resources Information Center

    Schwarz-Viechtbauer, Karin

    2003-01-01

    Summarizes four recent concerns of the Austrian Institute for School and Sport Facilities, which is responsible for current issues and problems related to educational buildings in the country: schools as low energy buildings, electromagnetic fields and school buildings, chairs and tables for educational buildings, and school grounds (learnscapes).…

  8. School Nutrition Facility Planning Guide.

    ERIC Educational Resources Information Center

    Pannell, Dorothy VanEgmond

    This publication is designed to help superintendents, local facilities coordinators, and food-service directors in planning the remodeling of an outdated food-service facility or the building of a new one. The introduction describes the roles of the local facility coordinator, the local child-nutrition director, the architect, the food-service…

  9. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G Street, NW., Washington, DC. The facility shall be open to...

  10. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G Street, NW., Washington, DC. The facility shall be open to...

  11. United Space Alliance LLC Parachute Refurbishment Facility Model

    NASA Technical Reports Server (NTRS)

    Esser, Valerie; Pessaro, Martha; Young, Angela

    2007-01-01

    The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.

  12. 9. Historic construction view of Building 100. 1956. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Historic construction view of Building 100. 1956. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  14. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  15. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  16. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  17. Sites, frequencies, and causes of self-reported fractures in 9,720 rheumatoid arthritis patients: a large prospective observational cohort study in Japan.

    PubMed

    Ochi, Kensuke; Furuya, Takefumi; Ikari, Katsunori; Taniguchi, Atsuo; Yamanaka, Hisashi; Momohara, Shigeki

    2013-01-01

    Sites, frequencies, and causes of self-reported fractures in Japanese patients with rheumatoid arthritis (RA) were evaluated in a prospective, observational cohort study. The incidence and cause of fracture differ by anatomical site, sex, and age. These differences may be considered in establishing custom strategies for preventing fractures in RA patients in the future. The literature contains limited data describing the details of fractures at different skeletal sites in patients with RA. We evaluated the details of fractures in Japanese RA patients on the basis of our Institute of Rheumatology Rheumatoid Arthritis cohort study in 9,720 RA patients (82 % women; mean age, 56 years) who were enrolled from 2000 to 2010. The details of fractures were obtained through biannual patient self-report questionnaires. Over a mean duration of 5.2 years, 1,317 patients (13.5 %) reported 2,323 incident fractures comprising 563 (24.2 %) clinical vertebral fractures and 1,760 (75.8 %) nonvertebral fractures. Rib fractures were the most common fractures in men, followed by clinical vertebral and hip fractures; the most common fractures in women were clinical vertebral fractures, followed by rib, foot, and hip fractures. There was a significant difference between sexes in the rates of rib, clavicle, shoulder, and ankle fractures. Spontaneous event was the primary cause of clinical vertebral fracture (65.4 %), whereas falls were the primary cause of upper extremity (76.5 %) and lower extremity (57.8 %) fractures. Rates of clinical vertebral and hip fractures increased, while those of rib and foot fractures decreased with increasing age. Incidence of falls, as causes of nonvertebral fractures, also increased in older age groups. Our results suggest that the causes of fractures may differ depending on anatomical site and that prevention of falls may be the most effective way to reduce upper and lower extremity fractures, especially in older patients with RA.

  18. Energy 101: Energy Efficient Commercial Buildings

    ScienceCinema

    None

    2018-06-06

    Learn how commercial buildings can incorporate whole-building design to save energy and money while enhancing performance and comfort. This video highlights several energy-saving features of the Research Support Facility at the Energy Department's National Renewable Energy Laboratory-a model for high-performance office building design.

  19. 43. CAPE COD AIR STATION PAVE PAWS FACILITY WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. CAPE COD AIR STATION PAVE PAWS FACILITY - WITH BUILDING METAL SIDING BEING APPLIED ON "C" FACE (RIGHT) AND "B" FACE BEING PREPARED FOR INSTALLATION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. Facilities | Hydrogen and Fuel Cells | NREL

    Science.gov Websites

    integration research. Photo of the Hydrogen Infrastructure Testing and Research Facility building, with hydrogen fueling station and fuel cell vehicles. Hydrogen Infrastructure Testing and Research Facility The Hydrogen Infrastructure Testing and Research Facility (HITRF) at the ESIF combines electrolyzers, a

  1. Europe sees mixed results from public-private partnerships for building and managing health care facilities and services.

    PubMed

    Barlow, James; Roehrich, Jens; Wright, Steve

    2013-01-01

    Prompted in part by constrained national budgets, European governments are increasingly partnering with the private sector to underwrite the costs of constructing and operating public hospitals and other health care facilities and delivering services. Through such public-private partnerships, governments hope to avoid up-front capital expenditure and to harness private-sector efficiencies, while private-sector partners aim for a return on investment. Our research indicates that to date, experience with these partnerships has been mixed. Early models of these partnerships-for example, in which a private firm builds a hospital and carries out building maintenance, which we term an "accommodation-only" model-arguably have not met expectations for achieving greater efficiencies at lower costs. Newer models described in this article offer greater opportunities for efficiency gains but are administratively harder to set up and manage. Given the shortages in public capital for new infrastructure, it seems likely that the attractiveness of these partnerships to European governments will grow.

  2. Assessment of capacity-building activities for forest measurement, reporting, and verification, 2011–15

    USGS Publications Warehouse

    Peneva-Reed, Elitsa I.; Romijn, J. Erika

    2018-05-31

    This report was written as a collaborative effort between the U.S. Geological Survey, SilvaCarbon, and Wageningen University with funding provided by the U.S. Agency for International Development and the European Space Agency, respectively, to address a pressing need for enhanced result-based monitoring and evaluation of delivered capacity-building activities. For this report, the capacity-building activities delivered by capacity-building providers (referred to as “providers” hereafter) during 2011–15 (the study period) to support countries in building measurement, reporting, and verification (MRV) systems for reducing emissions from deforestation and forest degradation (REDD+) were assessed and evaluated.Summarizing capacity-building activities and outcomes across multiple providers was challenging. Many of the providers did not have information readily available, which precluded them from participating in this study despite the usefulness of their information. This issue led to a key proposed future action: Capacity-building providers could establish a central repository within the Global Forestry Observation Initiative (GFOI; http://www.gfoi.org/) where data from past, current, and future activities of all capacity-building providers could be stored. The repository could be maintained in a manner to continually learn from previous lessons.Although various providers monitored and evaluated the success of their capacity-building activities, such evaluations only assessed the success of immediate outcomes and not the overarching outcomes and impacts of activities implemented by multiple providers. Good monitoring and evaluation should continuously monitor and periodically evaluate all factors affecting the outcomes of a provided capacity-building activity.The absence of a methodology to produce quantitative evidence of a causal link between multiple capacity-building activities delivered and successful outcomes left only a plausible association. A previous

  3. 340 Facility secondary containment and leak detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bendixsen, R.B.

    1995-01-31

    This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.

  4. Building Type Basics for College and University Facilities. Building Type Basics.

    ERIC Educational Resources Information Center

    Neuman, David J.; Kliment, Stephen A.

    This book provides indepth information that is needed to initiate a variety of building projects on a diverse range of college and university campuses. Filled with project photographs, diagrams, floor plans, sections, and details, the book combines highly illustrative, specialized material from industry leaders with nuts-and-bolts design…

  5. Communal biofuel burning for district heating: Emissions and immissions from medium-sized (0.4 and 1.5 MW) facilities

    NASA Astrophysics Data System (ADS)

    Fachinger, Friederike; Drewnick, Frank; Gieré, Reto; Borrmann, Stephan

    2018-05-01

    Particulate and gaseous emissions of two medium-sized district heating facilities (400 kW, fueled with miscanthus, and 1.5 MW, fueled with wood chips) were characterized for different operational conditions, and compared to previously obtained results for household wood and pellet stoves. SO2 and NOx emission factors (reported in mg MJFuel-1) were found to not only depend on fuel sulfur/nitrogen content, but also on combustion appliance type and efficiency. Emission factors of SO2, NOx, and PM (particulate matter) increased with increasing load. Particle chemical composition did not primarily depend on operational conditions, but varied mostly with combustion appliances, fuel types, and flue gas cleaning technologies. Black carbon content was decreasing with increasing combustion efficiency; chloride content was strongly enhanced when burning miscanthus. Flue gas cleaning using an electrostatic precipitator caused strong reduction not only in total PM, but also in the fraction of refractory and semi-refractory material within emitted PM1. For the impact of facilities on their surroundings (immissions) not only their total emissions are decisive, but also their stack heights. In immission measurements downwind of the two facilities, a plume could only be observed for the 400 kW facility with low (11 m) stack height (1.5 MW facility: 30 m), and measured immissions agreed reasonably well with predicted ones. The impact of these immissions is non-negligible: At a distance of 50 m from the facility, apart from CO2, also plume contributions of NOx, ultrafine particles, PM1, PM10, poly-aromatic hydrocarbons, and sulfate were detected, with enhancements above background values of 2-130%.

  6. Energy Efficiency in Water and Wastewater Facilities

    EPA Pesticide Factsheets

    Learn how local governments have achieved sustained energy improvements at their water and wastewater facilities through equipment upgrades, operational modifications, and modifications to facility buildings.

  7. Facilities of Environmental Distinction

    ERIC Educational Resources Information Center

    Pascopella, Angela

    2011-01-01

    Three of nine school buildings that have won the latest Educational Facility Design Awards from the American Institute of Architects (AIA) Committee on Architecture for Education stand out from the crowd of other school buildings because they are sustainable and are connected to the nature that surrounds them. They are: (1) Thurston Elementary…

  8. 15 CFR 712.4 - New Schedule 1 production facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...

  9. 15 CFR 712.4 - New Schedule 1 production facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...

  10. Intelligent buildings.

    PubMed

    Williams, W E

    1987-01-01

    The maturing of technologies in computer capabilities, particularly direct digital signals, has provided an exciting variety of new communication and facility control opportunities. These include telecommunications, energy management systems, security systems, office automation systems, local area networks, and video conferencing. New applications are developing continuously. The so-called "intelligent" or "smart" building concept evolves from the development of this advanced technology in building environments. Automation has had a dramatic effect on facility planning. For decades, communications were limited to the telephone, the typewritten message, and copy machines. The office itself and its functions had been essentially unchanged for decades. Office automation systems began to surface during the energy crisis and, although their newer technology was timely, they were, for the most part, designed separately from other new building systems. For example, most mainframe computer systems were originally stand-alone, as were word processing installations. In the last five years, the advances in distributive systems, networking, and personal computer capabilities have provided opportunities to make such dramatic improvements in productivity that the Selectric typewriter has gone from being the most advanced piece of office equipment to nearly total obsolescence.

  11. Laboratory Animal Facilities. Laboratory Design Notes.

    ERIC Educational Resources Information Center

    Jonas, Albert M.

    1965-01-01

    Design of laboratory animal facilities must be functional. Accordingly, the designer should be aware of the complex nature of animal research and specifically the type of animal research which will be conducted in a new facility. The building of animal-care facilities in research institutions requires special knowledge in laboratory animal…

  12. 300 Area Building Retention Evaluation Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  13. Enhancing Three-dimensional Movement Control System for Assemblies of Machine-Building Facilities

    NASA Astrophysics Data System (ADS)

    Kuzyakov, O. N.; Andreeva, M. A.

    2018-01-01

    Aspects of enhancing three-dimensional movement control system are given in the paper. Such system is to be used while controlling assemblies of machine-building facilities, which is a relevant issue. The base of the system known is three-dimensional movement control device with optical principle of action. The device consists of multi point light emitter and light receiver matrix. The processing of signals is enhanced to increase accuracy of measurements by switching from discrete to analog signals. Light receiver matrix is divided into four areas, and the output value of each light emitter in each matrix area is proportional to its luminance level. Thus, determing output electric signal value of each light emitter in corresponding area leads to determing position of multipoint light emitter and position of object tracked. This is done by using Case-based reasoning method, the precedent in which is described as integral signal value of each matrix area, coordinates of light receivers, which luminance level is high, and decision to be made in this situation.

  14. Building Reuse: Right for the Future.

    ERIC Educational Resources Information Center

    MacDonald, Gregory

    1996-01-01

    As library funding decreases, choosing to convert an unused building into a library is a beneficial alternative to building a new facility. Reuse saves money, building time, and gains greater community support. Offers advice on how to choose a location and what to look for in structure, mechanics, electrical resources; and discusses challenges in…

  15. Supporting Building Portfolio Investment and Policy Decision Making through an Integrated Building Utility Data Platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aziz, Azizan; Lasternas, Bertrand; Alschuler, Elena

    The American Recovery and Reinvestment Act stimulus funding of 2009 for smart grid projects resulted in the tripling of smart meters deployment. In 2012, the Green Button initiative provided utility customers with access to their real-time1 energy usage. The availability of finely granular data provides an enormous potential for energy data analytics and energy benchmarking. The sheer volume of time-series utility data from a large number of buildings also poses challenges in data collection, quality control, and database management for rigorous and meaningful analyses. In this paper, we will describe a building portfolio-level data analytics tool for operational optimization, businessmore » investment and policy assessment using 15-minute to monthly intervals utility data. The analytics tool is developed on top of the U.S. Department of Energy’s Standard Energy Efficiency Data (SEED) platform, an open source software application that manages energy performance data of large groups of buildings. To support the significantly large volume of granular interval data, we integrated a parallel time-series database to the existing relational database. The time-series database improves on the current utility data input, focusing on real-time data collection, storage, analytics and data quality control. The fully integrated data platform supports APIs for utility apps development by third party software developers. These apps will provide actionable intelligence for building owners and facilities managers. Unlike a commercial system, this platform is an open source platform funded by the U.S. Government, accessible to the public, researchers and other developers, to support initiatives in reducing building energy consumption.« less

  16. 45. BUILDING NO. 462, CHEMISTRY LAB (FORMERLY TRACER LOADING BUILDING), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. BUILDING NO. 462, CHEMISTRY LAB (FORMERLY TRACER LOADING BUILDING), VIEW LOOKING SOUTHEAST AT WEST SIDE. BUILDING NO. 462-B, GENERAL PURPOSE MAGAZINE, AT LEFT. - Picatinny Arsenal, 400 Area, Gun Bag Loading District, State Route 15 near I-80, Dover, Morris County, NJ

  17. Building a Better Campus: An Update on Building Codes.

    ERIC Educational Resources Information Center

    Madden, Michael J.

    2002-01-01

    Discusses the implications for higher education institutions in terms of facility planning, design, construction, and renovation of the move from regionally-developed model-building codes to two international sets of codes. Also addresses the new performance-based design option within the codes. (EV)

  18. 14. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  19. 13. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  20. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus will take place in the Industrial Area at NASA's Kennedy Space Center in Florida. A scale model of the new facility and landscaping is on display for the ceremony. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  1. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  2. 76 FR 63913 - Commercial Building Workforce Job/Task Analyses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability..., Commercial Building Energy Modeler, Commissioning/Retro-Commissioning Authority, Energy/Sustainability...-commissioning authority, energy/sustainability manager, facility manager, and/or operating engineer/building...

  3. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov Websites

    Management Facilities Vehicle Thermal Management Facilities Image of a building with two semi truck evaluation facilities to develop advanced thermal management technologies for vehicles. Vehicle Testing and apparatus. Combined fluid loops bench research apparatus in the Vehicle Thermal Management Laboratory. Photo

  4. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. Themore » DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.« less

  5. Facilities Spending Criticized as Uneven

    ERIC Educational Resources Information Center

    Greifner, Laura

    2006-01-01

    This article features a report on states and school districts spending almost $600 billion on building and renovating schools from 1995 to 2004, an amount that far exceed earlier expectations. The report also emphasized the uneven facilities spending between minority and affluent districts. Besides receiving the least money for facilities, the…

  6. Human Health Science Building Geothermal Heat Pump Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidel, James

    2014-12-22

    The grant objectives of the DOE grant funded project have been successfully completed. The Human Health Building (HHB) was constructed and opened for occupancy for the Fall 2012 semester of Oakland University. As with any large construction project, some issues arose which all were overcome to deliver the project on budget and on time. The facility design is a geothermal / solar-thermal hybrid building utilizing both desiccant dehumidification and variable refrigerant flow heat pumps. It is a cooling dominant building with a 400 ton cooling design day load, and 150 ton heating load on a design day. A 256 verticalmore » borehole (320 ft depth) ground source heat pump array is located south of the building under the existing parking lot. The temperature swing and performance over 2013 through 2015 shows the ground loop is well sized, and may even have excess capacity for a future building to the north (planned lab facility). The HHB achieve a US Green Building Counsel LEED Platinum rating by collecting 52 of the total 69 available LEED points for the New Construction v.2 scoring checklist. Being Oakland's first geothermal project, we were very pleased with the building outcome and performance with the energy consumption approximately 1/2 of the campus average facility, on a square foot basis.« less

  7. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeremy Gwin and Douglas Frenette

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values andmore » corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual

  8. Mitigating risks related to facilities management.

    PubMed

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  9. 7 CFR 15b.19 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... affect the usability of the facility or part of the facility shall to the maximum extent feasible, be... equivalent or greater access to and usability of the building is provided. (2) For purposes of this section...

  10. 7 CFR 15b.19 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... affect the usability of the facility or part of the facility shall to the maximum extent feasible, be... equivalent or greater access to and usability of the building is provided. (2) For purposes of this section...

  11. 7 CFR 15b.19 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... affect the usability of the facility or part of the facility shall to the maximum extent feasible, be... equivalent or greater access to and usability of the building is provided. (2) For purposes of this section...

  12. 39. Photocopy of building model photograph, ca. 1974, photographer unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of building model photograph, ca. 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - SHOWING "A" AND "B" FACES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. 56. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. Historic photo of excavation work at Building 202, shows facility with exhaust scrubber in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-712. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. 55. Historic photo of excavation work at Building 202, shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Historic photo of excavation work at Building 202, shows facility with detention tank in foreground, February 24, 1969. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-69-711. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 51. BUILDING NO. 533, SOLVENT RECOVERY BUILDING, LOOKING WEST AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. BUILDING NO. 533, SOLVENT RECOVERY BUILDING, LOOKING WEST AT SOUTHEAST (REAR) ELEVATION. - Picatinny Arsenal, 500 Area, Powder Factory & Power House, State Route 15 near I-80, Dover, Morris County, NJ

  16. Vehicle Assembly Building (VAB)

    NASA Image and Video Library

    2017-09-27

    NASA's Vehicle Assembly Building at Kennedy Space Center in Florida was used to assemble and house American-crewed launch vehicles from 1968 to 2011. AT 3,684,883 cubic meters, it is one of the largest buildings in the world by volume. Inside the facility, High Bay 3 is being upgraded and modified to support processing of the agency's Space Launch System rocket and Orion spacecraft.

  17. 38 CFR 39.21 - Space criteria for support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... building. The administrative building should be approximately 1,600 NSF in total, providing space, as... room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance/service building may be combined with the...

  18. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  19. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  20. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  1. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  2. 21 CFR 211.52 - Washing and toilet facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities... cold water, soap or detergent, air driers or single-service towels, and clean toilet facilities easily...

  3. Building 211 cyclotron characterization survey report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-03-30

    The Building 211 Cyclotron Characterization Survey includes an assessment of the radioactive and chemical inventory of materials stored within the facility; an evaluation of the relative distribution of accelerator-produced activation products within various cyclotron components and adjacent structures; measurement of the radiation fields throughout the facility; measurement and assessment of internal and external radioactive surface contamination on various equipment, facility structures, and air-handling systems; and an assessment of lead (Pb) paint and asbestos hazards within the facility.

  4. 9. BUILDING NO. 620B, FRICTION PENDULUM BUILDING. 29FOOT DROP TOWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. BUILDING NO. 620-B, FRICTION PENDULUM BUILDING. 29-FOOT DROP TOWER SITS BEHIND BLAST SHIELD IN FRONT OF BUILDING. - Picatinny Arsenal, 600 Area, Test Areas District, State Route 15 near I-80, Dover, Morris County, NJ

  5. Using the World Health Organization health system building blocks through survey of healthcare professionals to determine the performance of public healthcare facilities.

    PubMed

    Manyazewal, Tsegahun

    2017-01-01

    Acknowledging the health system strengthening agenda, the World Health Organization (WHO) has formulated a health systems framework that describes health systems in terms of six building blocks. This study aimed to determine the current status of the six WHO health system building blocks in public healthcare facilities in Ethiopia. A quantitative, cross-sectional study was conducted in five public hospitals in central Ethiopia which were in a post-reform period. A self-administered, structured questionnaire which covered the WHO's six health system building blocks was used to collect data on healthcare professionals who consented. Data was analyzed using IBM SPSS version 20. The overall performance of the public hospitals was 60% when weighed against the WHO building blocks which, in this procedure, needed a minimum of 80% score. For each building block, performance scores were: information 53%, health workforce 55%, medical products and technologies 58%, leadership and governance 61%, healthcare financing 62%, and service delivery 69%. There existed a significant difference in performance among the hospitals ( p  < .001). The study proved that the WHO's health system building blocks are useful for assessing the process of strengthening health systems in Ethiopia. The six blocks allow identifying different improvement opportunities in each one of the hospitals. There was no contradiction between the indicators of the WHO building blocks and the health sustainable development goal (SDG) objectives. However, such SDG objectives should not be a substitute for strategies to strengthen health systems.

  6. Earthquakes and building design: a primer for the laboratory animal professional.

    PubMed

    Vogelweid, Catherine M; Hill, James B; Shea, Robert A; Johnson, Daniel B

    2005-01-01

    Earthquakes can occur in most regions of the United States, so it might be necessary to reinforce vulnerable animal facilities to better protect research animals during these unpredictable events. A risk analysis should include an evaluation of the seismic hazard risk at the proposed building site balanced against the estimated consequences of losses. Risk analysis can help in better justifying and recommending to building owners the costs of incorporating additional seismic reinforcements. The planning team needs to specify the level of post-earthquake building function that is desired in the facility, and then design the facility to it.

  7. 40. Photocopy of building model photograph, ca., 1974, photographer unknown. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of building model photograph, ca., 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - ELEVATION SHOWING FLOOR AND EQUIPMENT LAYOUT. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  9. Waste processing building with incineration technology

    NASA Astrophysics Data System (ADS)

    Wasilah, Wasilah; Zaldi Suradin, Muh.

    2017-12-01

    In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.

  10. An image, looking southeast down the passage between E Building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    An image, looking southeast down the passage between E Building and M Building immediately to the east. The east entrance and the south wing of the building are visible - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  11. Recent health sciences library building projects.

    PubMed Central

    Ludwig, L

    1993-01-01

    The Medical Library Association's third annual survey of recent health sciences library building projects identified fourteen libraries planning, expanding, or constructing new library facilities. Three of five new library buildings are freestanding structures where the library occupies all or a major portion of the space. The two other new facilities are for separately administered units where the library is a major tenant. Nine projects involve additions to or renovations of existing space. Six projects are in projected, predesign, or design stages or are awaiting funding approval. This paper describes four projects that illustrate technology's growing effect on librarians and libraries. They are designed to accommodate change, a plethora of electronic gear, and easy use of technology. Outwardly, they do not look much different than many other modern buildings. But, inside, the changes have been dramatic although they have evolved slowly as the building structure has been adapted to new conditions. Images PMID:8251970

  12. 48 CFR 215.404-71-4 - Facilities capital employed.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and equipment, as derived in DD Form 1861, Contract Facilities Capital Cost of Money. (i) In addition... facilities capital, the allocated facilities capital attributable to the buildings and equipment of those... Equipment 17.5 10 to 25 (g) Evaluation criteria. (1) In evaluating facilities capital employed, the...

  13. DOE passive solar commercial buildings program: project summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The 23 projects participating in this program comprise a wide range of building types including offices, retail establishments, educational facilities, public service facilities, community and visitor centers, and private specialized-use facilities, located throughout the United States. Summary data and drawings are presented for each project. (MHR)

  14. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  15. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  16. 4 CFR 81.8 - Public reading facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Public reading facility. 81.8 Section 81.8 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PUBLIC AVAILABILITY OF GOVERNMENT ACCOUNTABILITY OFFICE RECORDS § 81.8 Public reading facility. GAO maintains a public reading facility in the Law Library at the Government Accountability Office Building, 441 G...

  17. Buildings interoperability landscape - Draft

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardin, Dave B.; Stephan, Eric G.; Wang, Weimin

    2015-02-01

    Buildings are an integral part of our nation’s energy economy. The advancement in information and communications technology (ICT) has revolutionized energy management in industrial facilities and large commercial buildings. As ICT costs decrease and capabilities increase, buildings automation and energy management features are transforming the small-medium commercial and residential buildings sectors. A vision of a connected world in which equipment and systems within buildings coordinate with each other to efficiently meet their owners’ and occupants’ needs, and where buildings regularly transact business with other buildings and service providers (such as gas and electric service providers) is emerging. However, while themore » technology to support this collaboration has been demonstrated at various degrees of maturity, the integration frameworks and ecosystems of products that support the ability to easily install, maintain, and evolve building systems and their equipment components are struggling to nurture the fledging business propositions of their proponents.« less

  18. 15 CFR 14.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... If DoC authorizes recipients to donate buildings or land for construction/facilities acquisition... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  19. 15 CFR 14.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... If DoC authorizes recipients to donate buildings or land for construction/facilities acquisition... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  20. 15 CFR 14.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... If DoC authorizes recipients to donate buildings or land for construction/facilities acquisition... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  1. 15 CFR 14.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... If DoC authorizes recipients to donate buildings or land for construction/facilities acquisition... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  2. 15 CFR 14.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... If DoC authorizes recipients to donate buildings or land for construction/facilities acquisition... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  3. Evaluating the Maturity of Cybersecurity Programs for Building Control Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glantz, Clifford S.; Somasundaram, Sriram; Mylrea, Michael E.

    The cyber-physical security threat to buildings is complex, non-linear, and rapidly evolving as operational and information technologies converge and connect buildings to cyberspace. Cyberattacks on buildings can exploit smart building controls and breach corporate networks, causing financial and reputational damage. This may result in the loss of sensitive building information or the disruption of, or damage to, the systems necessary for the safe and efficient operation of buildings. For the buildings and facility infrastructure, there is a need for a robust national cybersecurity strategy for buildings, guidance on the selection and implementation of appropriate cybersecurity controls for buildings, an approachmore » to evaluate the maturity and adequacy of the cybersecurity programs. To provide an approach for evaluating the maturity of the cybersecurity programs for building control systems, the US Department of Energy’s widely used Cybersecurity Capability and Maturity Model (C2M2) has been adapted into a building control systems version. The revised model, the Buildings-C2M2 (B-C2M2) provides maturity level indicators for cybersecurity programmatic domains. A “B-C2M2 Lite” version allows facility managers and building control system engineers, or information technology personnel to perform rapid self-assessments of their cybersecurity program. Both tools have been pilot tested on several facilities. This paper outlines the concept of a maturity model, describes the B-C2M2 tools, presents results and observations from the pilot assessments, and lays out plans for future work.« less

  4. Building 21st Century Schools: Designing Smarter, Sleeker High-Tech Facilities.

    ERIC Educational Resources Information Center

    Cutshall, Sandy

    2003-01-01

    The demand for high-tech programs in tandem with traditional classes challenges school districts to provide flexible facilities for career and technical education. Some districts partner with local businesses to develop state-of-the art facilities and deal with costs, upkeep, and upgrading. Some high-tech educational facilities are themselves…

  5. Laboratory Buildings.

    ERIC Educational Resources Information Center

    Barnett, Jonathan

    The need for flexibility in science research facilities is discussed, with emphasis on the effect of that need on the design of laboratories. The relationship of office space, bench space, and special equipment areas, and the location and distribution of piping and air conditioning, are considered particularly important. This building type study…

  6. 1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ANGLES IN BUILDING AT SOUTHERN END. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  7. A model for evaluating the environmental benefits of elementary school facilities.

    PubMed

    Ji, Changyoon; Hong, Taehoon; Jeong, Kwangbok; Leigh, Seung-Bok

    2014-01-01

    In this study, a model that is capable of evaluating the environmental benefits of a new elementary school facility was developed. The model is composed of three steps: (i) retrieval of elementary school facilities having similar characteristics as the new elementary school facility using case-based reasoning; (ii) creation of energy consumption and material data for the benchmark elementary school facility using the retrieved similar elementary school facilities; and (iii) evaluation of the environmental benefits of the new elementary school facility by assessing and comparing the environmental impact of the new and created benchmark elementary school facility using life cycle assessment. The developed model can present the environmental benefits of a new elementary school facility in terms of monetary values using Environmental Priority Strategy 2000, a damage-oriented life cycle impact assessment method. The developed model can be used for the following: (i) as criteria for a green-building rating system; (ii) as criteria for setting the support plan and size, such as the government's incentives for promoting green-building projects; and (iii) as criteria for determining the feasibility of green building projects in key business sectors. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. 15 CFR 310.7 - Statement for Federal participation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... 3. Exhibit No. 3. A certified copy of the building code which would be applicable should a pavilion... or financed buildings, roads and other facilities and in disposing of Federal land and properties.” ...

  9. 15 CFR 310.7 - Statement for Federal participation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... 3. Exhibit No. 3. A certified copy of the building code which would be applicable should a pavilion... or financed buildings, roads and other facilities and in disposing of Federal land and properties.” ...

  10. 15 CFR 310.7 - Statement for Federal participation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... 3. Exhibit No. 3. A certified copy of the building code which would be applicable should a pavilion... or financed buildings, roads and other facilities and in disposing of Federal land and properties.” ...

  11. 15 CFR 310.7 - Statement for Federal participation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... 3. Exhibit No. 3. A certified copy of the building code which would be applicable should a pavilion... or financed buildings, roads and other facilities and in disposing of Federal land and properties.” ...

  12. 15 CFR 310.7 - Statement for Federal participation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 3. Exhibit No. 3. A certified copy of the building code which would be applicable should a pavilion... or financed buildings, roads and other facilities and in disposing of Federal land and properties.” ...

  13. To Build or Not to Build: Addressing Facilities Needs While Controlling Costs

    ERIC Educational Resources Information Center

    Kadamus, James A.

    2015-01-01

    When trustees, presidents, and senior college administrators meet, one topic dominates the conversation: how to keep education quality high and costs down. To keep quality high, college leaders need to have strong faculties and state-of-the-art facilities for teaching and research. Quality counts but it also costs, and that is where the pressures…

  14. FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  15. The F-15B Propulsion Flight Test Fixture: A New Flight Facility For Propulsion Research

    NASA Technical Reports Server (NTRS)

    Corda, Stephen; Vachon, M. Jake; Palumbo, Nathan; Diebler, Corey; Tseng, Ting; Ginn, Anthony; Richwine, David

    2001-01-01

    The design and development of the F-15B Propulsion Flight Test Fixture (PFTF), a new facility for propulsion flight research, is described. Mounted underneath an F-15B fuselage, the PFTF provides volume for experiment systems and attachment points for propulsion devices. A unique feature of the PFTF is the incorporation of a six-degree-of-freedom force balance. Three-axis forces and moments can be measured in flight for experiments mounted to the force balance. The NASA F-15B airplane is described, including its performance and capabilities as a research test bed aircraft. The detailed description of the PFTF includes the geometry, internal layout and volume, force-balance operation, available instrumentation, and allowable experiment size and weight. The aerodynamic, stability and control, and structural designs of the PFTF are discussed, including results from aerodynamic computational fluid dynamic calculations and structural analyses. Details of current and future propulsion flight experiments are discussed. Information about the integration of propulsion flight experiments is provided for the potential PFTF user.

  16. Energy Conscious Design: Educational Facilities. [Brief No.] 1.

    ERIC Educational Resources Information Center

    American Inst. of Architects, Washington, DC.

    An energy task group of the American Institute of Architects discusses design features and options that educational facility designers can use to create an energy efficient school building. Design elements cover the building envelope, energy storage system, hydronic heating/cooling systems, solar energy collection, building orientation and shape,…

  17. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 10 years. (a) Administrative building. The administrative building should be approximately 1,600 NSF.../work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance...

  18. 26. BUILDING NO. 271I, LEAD AZIDE PRIMER BUILDING, WESTERN CORNER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. BUILDING NO. 271-I, LEAD AZIDE PRIMER BUILDING, WESTERN CORNER OF BUILDING SHOWING DOORS TO MIXING ROOM NO. 4. HAND CRANK VISIBLE AT RIGHT ROTATED SMALL POTS (CONTAINING LEAD AZIDE) IN MIXING ROOMS. - Picatinny Arsenal, 200 Area, Shell Component Loading, State Route 15 near I-80, Dover, Morris County, NJ

  19. State Requirements for Educational Facilities, 1999.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This updated, two-volume document provides guidance for those involved in the educational facilities procurement process, and includes recent legislative changes affecting the state of Florida's building code. The first volume is organized by the sequence of steps required in the facilities procurement process and presents state requirements for…

  20. BUILDING 122 CONTAINS THREE GENERAL AREAS: OFFICE AREAS, INTERNAL DOSIMETRY, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BUILDING 122 CONTAINS THREE GENERAL AREAS: OFFICE AREAS, INTERNAL DOSIMETRY, AND MEDICAL/HEALTH. BUILDING 122 SHARES A COMMON WALL WITH BUILDING 121, THE PLANT SECURITY BUILDING. THE TWO-STORY BUILDING IN THE BACKGROUND IS BUILDING 111. (9/26/52) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO

  1. 7 CFR 305.15 - Treatment requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Treatment requirements. 305.15 Section 305.15... SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Cold Treatments § 305.15 Treatment requirements. (a) Approval of treatment facilities. All facilities or locations used for refrigerating fruits...

  2. School Facilities Equity in California: An Empirical Study.

    ERIC Educational Resources Information Center

    Lowe, Davison Duane

    This is an equity study, focusing on the crowdedness and adequacy of California's public school facilities. Facilities data are from a 1988 state survey and include information about building space, age of facilities, air conditioning, and construction type. The research focuses on two equity principles: horizontal equity and facilities…

  3. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  4. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  5. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  6. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  7. Advanced Commercial Buildings Initiative Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Sydney G.

    The Southface Advanced Commercial Buildings Initiative has developed solutions to overcome market barriers to energy reductions in small commercial buildings by building on the success of four local and Southeast regional energy efficiency deployment programs. These programs address a variety of small commercial building types, efficiency levels, owners, facility manager skills and needs for financing. The deployment programs also reach critical private sector, utility, nonprofit and government submarkets, and have strong potential to be replicated at scale. During the grant period, 200 small commercial buildings participated in Southface-sponsored energy upgrade programs, saving 166,736,703 kBtu of source energy.

  8. 4. CONTROL BUILDING B, VIEW TOWARDS SOUTHEAST. Glenn L. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CONTROL BUILDING B, VIEW TOWARDS SOUTHEAST. - Glenn L. Martin Company, Titan Missile Test Facilities, Control Building B, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  9. The Facilities Audit. A Process for Improving Facilities Conditions.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    The problems of deferred maintenance and decaying campus infrastructure have troubled higher education for the past two decades. This book, designed to be a tool for facilities managers, describes a process for inspecting and reporting conditions of buildings and infrastructure. The audit process is meant to be a routine part of maintenance…

  10. Main Building (4800) at Dryden FRC

    NASA Image and Video Library

    1991-09-05

    The X-1E research aircraft provides a striking view at the entrance of NASA's Dryden Flight Research Center, Edwards, California. The X-1E, one of the three original X-1 aircraft modified with a raised cockpit canopy and an ejection seat, was flown at the facility between 1953 and 1958 to investigate speeds at twice that of sound, and also to evaluate a thin wing designed for high-speed flight. The Dryden complex was originally established in 1946 as a small high-speed flight station to support the X-1 program. The X-1 was the first aircraft to fly at supersonic speeds. The main administrative building is to the rear of the X-1E and is the center of a research installation that has grown to more than 450 government employees and nearly 400 civilian contractors. Located on the northwest "shore" of Rogers Dry Lake, the Dryden Center was built around the original administrative-hangar building constructed in 1954 at a cost of $3.8 million. Since then many additional support and operational facilities have been built including a number of unique test facilities such as the Thermalstructures Research Facility, Flow Visualization Facility, and the newest addition, the Integrated Test Facility.

  11. Construction alternatives for free-standing facilities.

    PubMed

    Brown, G

    1990-01-01

    Many hospitals are exploring free-standing facilities as an option for providing more efficient imaging services. Mr. Brown discusses the pros and cons of an emerging building technology, manufactured construction, in which building and site preparation are done simultaneously. He presents the criteria managers should use to make a knowledgeable decision.

  12. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assignment for the next 10 years. (a) Administrative building. The administrative building should be.../office/equipment/work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The...

  13. Commercial Building Energy Asset Score

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This software (Asset Scoring Tool) is designed to help building owners and managers to gain insight into the as-built efficiency of their buildings. It is a web tool where users can enter their building information and obtain an asset score report. The asset score report consists of modeled building energy use (by end use and by fuel type), building systems (envelope, lighting, heating, cooling, service hot water) evaluations, and recommended energy efficiency measures. The intended users are building owners and operators who have limited knowledge of building energy efficiency. The scoring tool collects minimum building data (~20 data entries) frommore » users and build a full-scale energy model using the inference functionalities from Facility Energy Decision System (FEDS). The scoring tool runs real-time building energy simulation using EnergyPlus and performs life-cycle cost analysis using FEDS. An API is also under development to allow the third-party applications to exchange data with the web service of the scoring tool.« less

  14. Do School Facilities Affect Academic Outcomes?

    ERIC Educational Resources Information Center

    Schneider, Mark

    This review explores which facility attributes affect academic outcomes the most and in what manner and degree. The research is examined in six categories: indoor air quality, ventilation, and thermal comfort; lighting; acoustics; building age and quality; school size; and class size. The review concludes that school facilities affect learning.…

  15. Design Standards for School Art Facilities

    ERIC Educational Resources Information Center

    National Art Education Association, 2015

    2015-01-01

    "Design Standards for School Art Facilities" is an invaluable resource for any school or school district looking to build new facilities for the visual arts or renovate existing ones. Discover detailed information about spaces for the breadth of media used in the visual arts. Photographs illustrate all types of features including…

  16. Campania Region's Educational Quality Facilities Project

    ERIC Educational Resources Information Center

    Ponti, Giorgio

    2009-01-01

    This article describes the Educational Quality Facilities project undertaken by Italy's Campania Region to provide quality facilities to all of its communities basing new spaces on the "Flexible Learning Module". The objectives of the five-year project are to: build and equip new educational spaces; improve the quality of existing…

  17. 7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF BUILDING 4 IS NOW WITHIN BUILDING 40 GARAGE.) - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA

  18. Avionics Systems Laboratory/Building 16. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia; Deming, Joan

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities that was conducted by NASA s Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, "Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas," prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Avionics Systems Laboratory (Building 16) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 5 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 16 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 16 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 16 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work product on CD, are

  19. 1. Context view of Building 205, showing hydrogen tanks in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Context view of Building 205, showing hydrogen tanks in foreground and Building 202 exhaust scrubber stack in background. View looking southwest from top of mound east of Building 205. - Rocket Engine Testing Facility, GRC Building No. 205, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  20. 36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  1. Finances and the Problems of America's School Buildings.

    ERIC Educational Resources Information Center

    Honeyman, David S.

    1994-01-01

    Discusses the history of financing school construction, and the condition of America's school buildings, including the age of school buildings, the cost and consequences of deferred maintenance, and the relationship of educational program to facilities. (SR)

  2. 21 CFR 226.20 - Buildings.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... operation for their intended purpose. The building shall: (a) Provide adequate space for the orderly.... (c) Provide for adequate washing, cleaning, toilet, and locker facilities. Work areas and equipment...

  3. 21 CFR 226.20 - Buildings.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... operation for their intended purpose. The building shall: (a) Provide adequate space for the orderly.... (c) Provide for adequate washing, cleaning, toilet, and locker facilities. Work areas and equipment...

  4. 21 CFR 226.20 - Buildings.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... operation for their intended purpose. The building shall: (a) Provide adequate space for the orderly.... (c) Provide for adequate washing, cleaning, toilet, and locker facilities. Work areas and equipment...

  5. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  6. Facilities | Geothermal Technologies | NREL

    Science.gov Websites

    research, development, analysis, and deployment. A photo of the Thermal Test Facility at NREL. Thermal Test development of building and thermal energy systems. For more information, read the fact sheet

  7. 37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  8. Does PDC Belong in Facilities Management?

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  9. PLANNING THE INDOOR PHYSICAL EDUCATION FACILITIES.

    ERIC Educational Resources Information Center

    HASE, GERALD J.; HICK, BASIL L.

    THIS PAMPHLET IS DESIGNED TO HELP ARCHITECTS AND LOCAL SCHOOL OFFICIALS IN THE PREPARATION OF PLANS FOR PHYSICAL EDUCATION FACILITIES IN NEW AND EXISTING BUILDINGS. FACILITIES MENTIONED INCLUDE--(1) GYMNASIUM, (2) SWIMMING POOL, (3) SMALL GROUP ACTIVITY ROOM, (4) DRESSING AND SHOWERING ROOMS, (5) TEAM ROOM, (6) EQUIPMENT DRYING ROOM, (7) LAUNDRY…

  10. NNSA B-Roll: MOX Facility

    ScienceCinema

    None

    2017-12-09

    In 1999, the National Nuclear Security Administration (NNSA) signed a contract with a consortium, now called Shaw AREVA MOX Services, LLC to design, build, and operate a Mixed Oxide (MOX) Fuel Fabrication Facility. This facility will be a major component in the United States program to dispose of surplus weapon-grade plutonium. The facility will take surplus weapon-grade plutonium, remove impurities, and mix it with uranium oxide to form MOX fuel pellets for reactor fuel assemblies. These assemblies will be irradiated in commercial nuclear power reactors.

  11. NNSA B-Roll: MOX Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2010-05-21

    In 1999, the National Nuclear Security Administration (NNSA) signed a contract with a consortium, now called Shaw AREVA MOX Services, LLC to design, build, and operate a Mixed Oxide (MOX) Fuel Fabrication Facility. This facility will be a major component in the United States program to dispose of surplus weapon-grade plutonium. The facility will take surplus weapon-grade plutonium, remove impurities, and mix it with uranium oxide to form MOX fuel pellets for reactor fuel assemblies. These assemblies will be irradiated in commercial nuclear power reactors.

  12. 7 CFR 15b.38 - Health care facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... facilities. (a) Communications. A recipient that provides notice concerning benefits or services or written... ensure that qualified handicapped persons, including those with impaired sensory or speaking skills, are... effective communication with persons with impaired hearing for the purpose of providing emergency health...

  13. Lightning and surge protection of large ground facilities

    NASA Astrophysics Data System (ADS)

    Stringfellow, Michael F.

    1988-04-01

    The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.

  14. This photograph, taken from the main roof of E Building, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    This photograph, taken from the main roof of E Building, looking north, shows two metal penthouses at right, a similar brick structure and some of the vents and other mechanical devices of the building - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  15. One wall of the original E Building is visible in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    One wall of the original E Building is visible in the back of this image, looking west in Room 142, a typical laboratory space - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  16. View looking southeast from the roof of OSW Building, toward ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking southeast from the roof of OSW Building, toward E Building (center ground of image). Part of H Building is in the immediate foreground. This photograph shows the relationship between E Building and others adjacent to it as well as some of the panorama of the site - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  17. 35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  18. The Long-Baseline Neutrino Facility: Building the Future

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fermilab

    The Long-Baseline Neutrino Facility (LBNF) will be the world’s flagship science project to unlock the mysteries of neutrinos, the particles that could be the key to explaining why matter exists in our universe. It will house the infrastructure and particle detectors for the Deep Underground Neutrino Experiment (DUNE) and will use the world’s most intense neutrino beam. LBNF will be hosted at the U.S. Department of Energy’s Fermi National Accelerator Laboratory in Illinois and the Sanford Underground Research Facility in South Dakota. About 1,000 scientists from more than 160 laboratories and universities in 30 countries are contributing to this internationalmore » mega-science project. In addition to direct economic benefits to the states of Illinois and South Dakota, LBNF will foster STEM education nationwide and keep the United States at the leading edge of global science and innovation.« less

  19. Aerial view of the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1998-01-01

    From the air over KSC can be seen the Shuttle Landing Facility. Orbiter landings at the Kennedy Space Center are made on one of the largest runways in the world. The runway is located 3.2 km (2 miles) northwest of the Vehicle Assembly Building and is 4,572 meters (15,000ft) long and 91.4 meters (300ft) wide -- about as wide as the length of a football field. It has 305 meters (1000ft) of paved overruns at each end and the paving thickness is 40.6cm (15 inches) at the center. At left in the photo is the Aircraft Ground Equipment Shed; in the center is the Landing Aids Control Building (LACB) which supports landing operations and houses operations personnel. Located at the northeast corner of the parking apron is the Mate/Demate device (MDD) used to raise and lower the orbiter from its 747 carrier aircraft during ferry operations. The open-truss steel structure is equipped with hoists, adapters and movable platforms for access to certain orbiter components and equipment. It also is equipped with lightning protection devices. The MDD is 45.7 meters (150ft) long, 28.3 meters (93ft) wide and 32 meters (105ft) high. On the landing area in front of the SLF is a T-38 jet airplane.

  20. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... NFPA 307, chapter 5. (2) Containers. Containers packed with dangerous cargo that are vertically stacked... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES... facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that...

  1. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... NFPA 307, chapter 5. (2) Containers. Containers packed with dangerous cargo that are vertically stacked... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES... facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that...

  2. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... NFPA 307, chapter 5. (2) Containers. Containers packed with dangerous cargo that are vertically stacked... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES... facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that...

  3. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... NFPA 307, chapter 5. (2) Containers. Containers packed with dangerous cargo that are vertically stacked... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES... facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that...

  4. 33 CFR 126.15 - What conditions must a designated waterfront facility meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... NFPA 307, chapter 5. (2) Containers. Containers packed with dangerous cargo that are vertically stacked... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES... facility transfers dangerous cargo between sunset and sunrise, it must have outdoor lighting that...

  5. 37 CFR 102.2 - Public reference facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Public reference facilities. 102.2 Section 102.2 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... thereto. The public reference facility is located in the Public Search Room, Madison Building East, First...

  6. 37 CFR 102.2 - Public reference facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Public reference facilities. 102.2 Section 102.2 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... thereto. The public reference facility is located in the Public Search Room, Madison Building East, First...

  7. 37 CFR 102.2 - Public reference facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Public reference facilities. 102.2 Section 102.2 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... thereto. The public reference facility is located in the Public Search Room, Madison Building East, First...

  8. 37 CFR 102.2 - Public reference facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Public reference facilities. 102.2 Section 102.2 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... thereto. The public reference facility is located in the Public Search Room, Madison Building East, First...

  9. 37 CFR 102.2 - Public reference facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Public reference facilities. 102.2 Section 102.2 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... thereto. The public reference facility is located in the Public Search Room, Madison Building East, First...

  10. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  11. Disaster Management and Educational Facilities.

    ERIC Educational Resources Information Center

    Kenny, Grace

    2002-01-01

    Summarizes discussions from a seminar focusing on earthquakes and educational facilities, including findings related to educational buildings; partnerships; training; standards, regulations, and procedures; finance and legislation; and research and support. (EV)

  12. 15 CFR 760.3 - Exceptions to prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., a U.S. contractor building an industrial facility in boycotting country Y is asked by B, a resident... agency of boycotting country Y to build a pipeline. Y requests A to suggest qualified engineering firms... conducts its operations, to identify qualified engineering firms to its customers so that its customers may...

  13. 15 CFR 760.3 - Exceptions to prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., a U.S. contractor building an industrial facility in boycotting country Y is asked by B, a resident... agency of boycotting country Y to build a pipeline. Y requests A to suggest qualified engineering firms... conducts its operations, to identify qualified engineering firms to its customers so that its customers may...

  14. Communications and Tracking Development Laboratory/Building 44. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas, prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Communications and Tracking Development Laboratory (Building 44) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 44 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle Program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. At the time of this documentation, Building 44 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented by 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle Program; the history of JSC in relation to the SSP; a narrative of the history of Building 44 and how it supported the SSP; and a physical description of the building. In addition, photographs documenting the construction and historical use of Building 44 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features, and engineering details, are included. A contact sheet printed on archival paper, and an electronic copy of the work

  15. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  16. Balancing Multiple Needs through Innovative Facility Design.

    ERIC Educational Resources Information Center

    Romano, C. Renee; Hanish, Jan

    2003-01-01

    Designing buildings that incorporate and integrate a number of departments and functions is one way that colleges and universities are balancing financial challenges and facility needs. These buildings can transform the campus, but they require planning and coordination from a carefully assembled design team. (Contains 18 references.) (Author)

  17. New NREL Research Facility Slashes Energy Use by 66 Percent

    Science.gov Websites

    Thermal Test Facility, which serves as a showcase of energy-saving features and the home of NREL's cutting technologies now being developed at the Thermal Test Facility will help us reach this goal." The facility energy-efficient building design, NREL's Thermal Test Facility houses sophisticated equipment for

  18. Facilities Management of Existing School Buildings: Two Models.

    ERIC Educational Resources Information Center

    Building Technology, Inc., Silver Spring, MD.

    While all school districts are responsible for the management of their existing buildings, they often approach the task in different ways. This document presents two models that offer ways a school district administration, regardless of size, may introduce activities into its ongoing management process that will lead to improvements in earthquake…

  19. 18. VIEW OF THE SECOND FLOOR OF BUILDING 707. AIR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW OF THE SECOND FLOOR OF BUILDING 707. AIR EXHAUST FANS ARE USED TO MAINTAIN PRESSURE DIFFERENTIALS WITHIN THE BUILDING. (5/70) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  20. 1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  1. 2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  2. 4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  3. 3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  4. 15 CFR 923.52 - Consideration of the national interest in facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...

  5. 15 CFR 923.52 - Consideration of the national interest in facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...

  6. Understanding Functional Adequacy and Facility Condition for Strategic Decision Making

    ERIC Educational Resources Information Center

    Dufresne, Ray

    2012-01-01

    At colleges and universities today, the increasing number of students is putting new pressure on facilities--and on facility staff. Student needs are also increasingly different, and most campus facilities have not kept up with the changing times. Facilities are expensive to build, maintain, and renovate, and costs are on the rise. Funds for…

  7. 6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ADDITION AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  8. 9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ADDITION AT RIGHT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA

  9. 6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  10. 5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  11. Mission Control Center/Building 30. Historical Documentation

    NASA Technical Reports Server (NTRS)

    2010-01-01

    As part of this nation-wide study, in September 2006, historical survey and evaluation of NASA-owned and managed facilities was conducted by NASA's Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The results of this study are presented in a report entitled, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, Lyndon B. Johnson Space Center, Houston, Texas, prepared in November 2007 by NASA JSC s contractor, Archaeological Consultants, Inc. As a result of this survey, the Mission Control Center (Building 30) was determined eligible for listing in the NRHP, with concurrence by the Texas State Historic Preservation Officer (SHPO). The survey concluded that Building 30 is eligible for the NRHP under Criteria A and C in the context of the U.S. Space Shuttle Program (1969-2010). Because it has achieved significance within the past 50 years, Criteria Consideration G applies. It should be noted that the Mission Control Center was designated a National Historic Landmark in 1985 for its role in the Apollo 11 Lunar Landing. At the time of this documentation, Building 30 was still used to support the SSP as an engineering research facility, which is also sometimes used for astronaut training. This documentation package precedes any undertaking as defined by Section 106 of the NHPA, as amended, and implemented in 36 CFR Part 800, as NASA JSC has decided to proactively pursue efforts to mitigate the potential adverse affects of any future modifications to the facility. It includes a historical summary of the Space Shuttle program; the history of JSC in relation to the SSP; a narrative of the history of Building 30 and how it supported the SSP; and a physical description of the structure. In addition, photographs documenting the construction and historical use of Building 30 in support of the SSP, as well as photographs of the facility documenting the existing conditions, special technological features

  12. 5. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. EXTENSIONS TO BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. EXTENSIONS TO BUILDING 13 CLEARLY VISIBLE. ROM LEFT TO RIGHT, FORMER BUILDING 13, ADDITION WITH LARGE ROLL-UP DOOR, CANOPY 723. BUILDING 42 VISIBLE IN PERSPECTIVE LINE. - NASA Industrial Plant, Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  13. LAFD: TA-55 RLUOB/CUB Facility Familiarization Tour, OJT #55265

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Victor Stephen

    2017-09-14

    Los Alamos National Laboratory (LANL) conducts familiarization tours for personnel of the Los Alamos County Fire Department (LAFD) at the RLUOB/CUB, technical area (TA)-55, 400/440, facility, Radiological Laboratory Utility Office Building (RLUOB)/Central Utility Building (CUB). These familiarization tours are official LANL business; the purpose of these tours is to orient LAFD firefighters to the facility so that they can respond efficiently and quickly to a variety of emergency situations. This orientation includes, among other topics, the ingress and egress of the area and buildings, layout and organization of the facility, evacuation procedures and assembly points, and areas of concern withinmore » the various buildings at the facility. LAFD firefighters have the skills and abilities to perform firefighting operations and other emergency response tasks that cannot be provided by other LANL personnel who have the required clearance level. This handout provides details of the information, along with maps and diagrams, to be presented during the familiarization tours. The handout is distributed to the trainees at the time of the tour; a corresponding checklist is also used as guidance during the familiarization tours to ensure that all required information is presented to LAFD personnel.« less

  14. 13. Building 202 exhaust scrubber water detention tank, looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building 202 exhaust scrubber water detention tank, looking southeast from bed of Abram Creek. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  15. 3. Southeast corner of Building 202, looking northwest from steps ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southeast corner of Building 202, looking northwest from steps on hillside near water tank. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE FIRE TEAM FACILITY (BUILDING 3001) (CENTER). VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  17. Smart Home and Building Systems | Energy Systems Integration Facility |

    Science.gov Websites

    Exploring how intelligent building systems and the dynamic grid of the future can work together evaluate them as a neighborhood Exploring functionality, applications, interoperability, and cybersecurity

  18. DKIST facility management system integration

    NASA Astrophysics Data System (ADS)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  19. 38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  20. 20. Building 202, detail of stand A, rocket test stand ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Building 202, detail of stand A, rocket test stand in test cell. View looking southeast. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH