Sample records for facility construction project

  1. Construction Cost Growth for New Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubic, Jr., William L.

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less

  2. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  3. 42 CFR 124.3 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...

  4. 42 CFR 124.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...

  5. 23 CFR 652.9 - Federal participation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... acquisition of land needed for the facility, or such projects may be constructed on existing highway right-of... bicycle lanes, paths, shelters, bicycle parking facilities and other roadway and bridge work necessary to... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...

  6. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  7. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  8. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  9. 77 FR 55208 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...

  10. Construction Management--Exploding Some Myths.

    ERIC Educational Resources Information Center

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  11. Boom Time.

    ERIC Educational Resources Information Center

    Agron, Joe

    1998-01-01

    Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…

  12. Hanford Spent Nuclear Fuel Project recommended path forward

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fulton, J.C.

    The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less

  13. The National Ignition Facility and Industry

    NASA Astrophysics Data System (ADS)

    Harri, J. G.; Paisner, J. A.; Lowdermilk, W. H.; Boyes, J. D.; Kumpan, S. A.; Sorem, M. S.

    1994-09-01

    The mission of the National Ignition Facility is to achieve ignition and gain in inertial confinement fusion targets in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects testing, and for civilian applications such as fusion energy development and fundamental studies of matter at high temperatures and densities. The National Ignition Facility construction project will require the best of our construction industries and its success will depend on the best products offered by hundreds of the nation's high technology companies. Three-fourths of the construction costs will be invested in industry. This article reviews the design, cost and schedule, and required industrial involvement associated with the construction project.

  14. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  15. PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  16. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  17. 39 CFR 776.8 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...

  18. 39 CFR 776.8 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...

  19. 39 CFR 776.8 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...

  20. 39 CFR 776.8 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Wetlands Protection... facility actions located in a wetland: (1) New construction, owned or leased; or (2) Construction projects..., interpretation, or enjoyment of wetland resources; (2) Construction at existing postal facilities pursuant to the...

  1. 30 CFR 285.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651... facilities on my limited lease or any facilities on my project easement proposed under my GAP? If you are...

  2. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  3. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  4. Project Delivery Methods.

    ERIC Educational Resources Information Center

    Dolan, Thomas G.

    2003-01-01

    Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)

  5. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  6. Environmental Projects. Volume 9: Construction of hazardous materials storage facilities

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.

  7. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... implementing both short-range and long-range projects. Proposed facility improvements and phased construction... Institute Foreign Language Center (DLIFLC). Facilities, construction, improvements, renovations... have modern facilities consistent with Army standards well into the 21st Century. The overall goal is...

  8. 25 CFR 170.473 - What happens when a construction project ends?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...

  9. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... decommission the Ocotillo Sol Solar Project, a solar photovoltaic (PV) power plant facility, on approximately... Applicant's Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...

  10. 77 FR 28618 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... project, a solar photovoltaic (PV) power plant facility, on approximately 115 acres of BLM-administered... Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility on BLM...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft Environmental...

  11. Environmental Assessment (EA): Proposed Software Facilities, Hill Air Force Base, Utah

    DTIC Science & Technology

    2011-04-19

    retention facilities ; • connections to adjacent buried utilities consisting of water, electricity, natural gas, telephone/ data , sanitary sewer, and storm...engineering, development, and testing workloads for F-22 and F-35 aircraft. Military construction (MILCON) project data explain existing facilities ...Existing Facilities MILCON project data state there are no facilities on Hill AFB with adequate security to house the specialized laboratory space or

  12. CAP: Construction Assistance Plan. Handbook for Construction Project Planning, Oregon Community Colleges.

    ERIC Educational Resources Information Center

    Duncan, Verne A.

    This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…

  13. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  14. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  15. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less

  16. 76 FR 22631 - Community Facility Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... restrictive language in 7 CFR part 1942 that limits projects using alternate construction methods to loans... field staff and applicants understand when a project qualifies as an alternate construction method. None... contracting method projects must comply with the requirements for ``maximum open and free competition'' in...

  17. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  18. Fabulous Facilities: New Constructions and Renovations.

    ERIC Educational Resources Information Center

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  19. Facilities Standards and Planning Manual for New Jersey County Community Colleges.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Higher Education, Trenton. Office of Community Coll. Programs.

    After some general comments concerning all guidelines, planning standards are described for--(1) various types of new facilities, (2) expansion of present facilities, (3) minimum space requirements for a college, (4) net-to-gross space ratios, and (5) total project costs. Information regarding capital construction project submissions procedure is…

  20. The Ohio School Facilities Commission. Revamping the State's School Construction Projects.

    ERIC Educational Resources Information Center

    De Patta, Joe

    2001-01-01

    Presents an interview with the Ohio School Facilities Commission's (OSFC) Executive Director who discusses the OSFC's history and its work in managing K-12 school facilities throughout the state. Topics include its efforts to help school districts get bond measures on ballets, funding projects, and its "Partnering Program" for construction…

  1. Public Law 94-103: 94th Congress, H.R. 4005, October 4, 1975. An Act to Amend the Developmental Disabilities Services and Facilities Construction Act to Revise and Extend the Programs Authorized by that Act.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate.

    Presented is the 1975 amendment to the Developmental Disabilities Services and Facilities Construction Act. Described are revisions and extensions of the earlier act, including revision of grant and construction assistance for university affiliated facilities, and revision of special projects assistance. The earlier act's designation of rights of…

  2. Food irradiation: Technology transfer in Asia, practical experiences

    NASA Astrophysics Data System (ADS)

    Kunstadt, Peter; Eng, P.

    1993-10-01

    Nordion International Inc., in cooperation with the Thai Office of Atomic Energy for Peace (OAEP) and the Canadian International Development Agency (CIDA) recently completed a unique food irradiation technology transfer project in Thailand. This complete food irradiation technology transfer project included the design and construction of an automatic multipurpose irradiation facility as well as the services of construction and installation management and experts in facility operation, maintenance and training. This paper provides an insight into the many events that led to the succesful conclusion of the world's first complete food irradiation technology transfer project.

  3. Construction comparison of Louisiana's conventional and alternative base courses under accelerated loading : final report.

    DOT National Transportation Integrated Search

    2001-11-01

    This report describes the test results of the first project at the Louisiana Transportation Research Center's Accelerated Loading Facility (ALF). In 1995, 9 test lanes were constructed at the Louisiana Pavement Research Facility in Port Allen. These ...

  4. Optimizing Value and Avoiding Problems in Building Schools.

    ERIC Educational Resources Information Center

    Brevard County School Board, Cocoa, FL.

    This report describes school design and construction delivery processes used by the School Board of Brevard County (Cocoa, Florida) that help optimize value, avoid problems, and eliminate the cost of maintaining a large facility staff. The project phases are examined from project definition through design to construction. Project delivery…

  5. 76 FR 19121 - Notice of Submission of Proposed Information Collection to OMB Multifamily Project Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... Proposed Information Collection to OMB Multifamily Project Applications and Construction Prior to Initial... facilities is also required as part of the application for firm commitment for mortgage insurance. Project owners/sponsors may apply for permission to commence construction prior to initial endorsement. DATES...

  6. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  7. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  8. Corridor reservation : implications for recouping a portion of the "unearned increment" arising from construction of transportation facilities : final report.

    DOT National Transportation Integrated Search

    1994-01-01

    This report examines the phenomenon of the unearned increment, which is the often substantial increase in private land values resulting from transportation facility construction, and possible attempts to recoup it to finance transportation projects. ...

  9. Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeff Bryan; Bill Landman; Porter Hill

    2012-12-01

    An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: ? No Action ? Modify Existing DOE Facilities – capabilities distributed among multiple locations ? Modify Existing DOE Facilities – capabilities consolidated at a few locations ? Construct New Facility ? Commercial Partnership ? International Partnerships Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by amore » new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.« less

  10. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  11. Department of the Army Justification of Estimates for Fiscal Year 1985. Procurement Appropriations-Construction Program Submitted to Congress February 1984. DD Forms 1391.

    DTIC Science & Technology

    1984-02-01

    REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth

  12. 77 FR 29537 - Community Facility Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... alternate contracting method projects must comply with the requirements for ``maximum open and free... of alternate construction contract methods (such as Design/Build and Construction Management) by the.... Further, these changes will give all applicants greater flexibility in developing projects. Therefore, a...

  13. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2014-10-01 2014-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  14. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2011-10-01 2011-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  15. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2013-10-01 2013-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  16. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2012-10-01 2012-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  17. A Center for Extraterrestrial Engineering and Construction (CETEC)

    NASA Technical Reports Server (NTRS)

    Leigh, Gerald G.

    1992-01-01

    A group of knowledgeable scientists and engineers in New Mexico has recognized the need for such a testing capability and has proposed a project to evelop an extraterrestrial surface simulation facility. A group of universities, national laboratories, and private industrial firms is proposing to establish a Center for Extraterrestrial Engineering and Construction (CETEC) and to develop large extraterrestrial surface simulation facilities in which this needed testing can be realistically performed. The CETEC is envisioned to be both a center of knowledge and data regarding engineering, construction, mining, and material process operations on extraterrestrial bodies and a set of extraterrestrial surface simulation facilities. The primary CETEC facility is proposed to be a large domed building made of steel reinforced concrete with more than one acre of test floor area covered with several feet of simulated lunar soil and dust. Various aspects of the project are presented in viewgraph form.

  18. Maryland Health and Higher Educational Facilities Authority. 1996 Annual Report.

    ERIC Educational Resources Information Center

    Maryland State Health and Higher Educational Facilities Authority, Baltimore.

    The Maryland Health and Higher Educational Facilities Authority performs various functions including: issuing bonds and bond anticipation notes; fixing rates and collecting user rents and fees; constructing, acquiring, and maintaining institutional projects; contracting for operation and maintenance of projects; establishing rules and regulations…

  19. 36 CFR Appendix A to Part 1234 - Minimum Security Standards for Level III Federal Facilities

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction projects should be reviewed if possible, to incorporate current technology and blast standards... critical systems (alarm systems, radio communications, computer facilities, etc.) Required. Occupant... all exterior windows (shatter protection) Recommended. Review current projects for blast standards...

  20. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  1. Recovery Act: Johnston Rhode Island Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galowitz, Stephen

    The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven andmore » reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). 3) The Project will annually produce 365,292 MWh's of clean energy. 4) By destroying the methane in the landfill gas, the Project will generate CO{sub 2} equivalent reductions of 164,938 tons annually. The completed facility produces 28.3 MWnet and operates 24 hours a day, seven days a week.« less

  2. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  3. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  4. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  5. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  6. 42 CFR 124.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...

  7. "Getting the College Union Building Project Under Way." A Seminar.

    ERIC Educational Resources Information Center

    Butts, Porter

    In this speech, the author provides some guidelines covering student union construction for those administrators contemplating the construction of such a facility. The recommendations and information presented cover (1) the organization and functions of an official "union planning committee;" (2) a survey of local needs regarding facilities to be…

  8. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services, quality activities, or administrative costs). (h) A construction or renovation project that... facilities. 98.84 Section 98.84 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... child care services provided by the Tribal Lead Agency as compared to the level of services provided by...

  9. High Intensity Proton Accelerator Project in Japan (J-PARC).

    PubMed

    Tanaka, Shun-ichi

    2005-01-01

    The High Intensity Proton Accelerator Project, named as J-PARC, was started on 1 April 2001 at Tokai-site of JAERI. The accelerator complex of J-PARC consists of three accelerators: 400 MeV Linac, 3 GeV rapid cycle synchrotron and 50 GeV synchrotron; and four major experimental facilities: Material and Life Science Facility, Nuclear and Particle Physics Facility, Nuclear Transmutation Experiment Facility and Neutrino Facility. The outline of the J-PARC is presented with the current status of construction.

  10. Report: American Recovery and Reinvestment Act Site Visit of the Wastewater Treatment Facility Improvements Project, Perkins, Oklahoma

    EPA Pesticide Factsheets

    Report #11-R-0214, May 2, 2011. We conducted an unannounced visit of the construction site of the Perkins Public Works Authority’s wastewater treatment facility improvements project in Perkins, Oklahoma, on April 19–22, 2010.

  11. Guidebook to the School Facility Program.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This guidebook assists California school districts in applying for and obtaining "grant" funds for new construction and modernization projects of its public schools under the provisions of the Leroy F. Greene School Facilities Act of 1998. It provides direction on accessing the processes leading to project approvals, insight into the various…

  12. National Biomedical Tracer Facility: Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heaton, R.; Peterson, E.; Smith, P.

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPFmore » to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.« less

  13. Feasibility Investigation for a Solar Power Generation Facility

    NASA Technical Reports Server (NTRS)

    Nathan, Lakshmi

    2010-01-01

    The Energy Policy Act of 2005 states that by fiscal year 2013, at least 7.5% of the energy consumed by the government must be renewable energy. In an effort to help meet this goal, Johnson Space Center (JSC) is considering installing a solar power generation facility. The purpose of this project is to conduct a feasibility investigation for such a facility. Because Kennedy Space Center (KSC) has a solar power generation facility, the first step in this investigation is to learn about KSC's facility and obtain information on how it was constructed. After collecting this information, the following must be determined: the amount of power desired, the size of the facility, potential locations for it, and estimated construction and maintenance costs. Contacts with JSC's energy provider must also be established to determine if a partnership would be agreeable to both parties. Lastly, all of this data must be analyzed to decide whether or not JSC should construct the facility. The results from analyzing the data collected indicate that a 200 kW facility would provide enough energy to meet 1% of JSC's energy demand. This facility would require less than 1 acre of land. In the map below, potential locations are shown in green. The solar power facility is projected to cost $2 M. So far, the information collected indicates that such a facility could be constructed. The next steps in this investigation include contacting JSC's energy provider, CenterPoint Energy, to discuss entering a partnership; developing a life cycle cost analysis to determine payback time; developing more detailed plans; and securing funding.

  14. The Utilization and Design of Physical Facilities for the Rehabilitation of Mentally Retarded. Final Project Report.

    ERIC Educational Resources Information Center

    Bair, Howard V.; Leland, Henry

    To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…

  15. 76 FR 16440 - Endangered and Threatened Wildlife and Plants; Permits, Town of Apple Valley, San Bernardino...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...

  16. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are projects administered? 170.471 Section 170.471 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and...

  17. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  18. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  19. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  20. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  1. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  2. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... contracts under this subpart are: design and architectural/engineering services, construction project management, and the actual construction of the building or facility in accordance with the construction... construction management services as defined in § 900.113 may be included in a construction contract under this...

  3. ABC's of Construction. Final Report.

    ERIC Educational Resources Information Center

    Greater Baton Rouge Chamber of Commerce, LA.

    The ABC's of Construction project was a demonstration project designed to integrate basic skills training with an industry-developed vocational-craft training program. The program was located at the central training facility of the Pelican Chapter of Associated Builders and Contractors (ABC), an organization made up of nearly 300 member companies…

  4. Selecting the Right Construction Delivery Method for a Specific Project.

    ERIC Educational Resources Information Center

    Klinger, Jeff; Booth, Scott

    2002-01-01

    Discusses the costs and benefits of various construction delivery methods for higher education facility projects, including the traditional lump sum general contracting approach (also known as design/bid/build); design-build; and, in the case of private institutions, guaranteed maximum pricing offered by those firms willing to perform construction…

  5. Pitfalls Lurk for School-Project Chiefs

    ERIC Educational Resources Information Center

    Sack, Joetta L.

    2004-01-01

    This paper, Part 3 of a three-part series examining the boom in the construction and renovation of K-12 schools and the continuing challenges that communities face in getting the facilities their students and educators need, describes the demanding career aspects of school administrators who oversee construction projects. Building schools requires…

  6. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  7. Making of the NSTX Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. Neumeyer; M. Ono; S.M. Kaye

    1999-11-01

    The NSTX (National Spherical Torus Experiment) facility located at Princeton Plasma Physics Laboratory is the newest national fusion science experimental facility for the restructured US Fusion Energy Science Program. The NSTX project was approved in FY 97 as the first proof-of-principle national fusion facility dedicated to the spherical torus research. On Feb. 15, 1999, the first plasma was achieved 10 weeks ahead of schedule. The project was completed on budget and with an outstanding safety record. This paper gives an overview of the NSTX facility construction and the initial plasma operations.

  8. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  9. 77 FR 60981 - Kinder Morgan Interstate Gas Transmission L.L.C.; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Pony Express Pipeline Conversion Project and Request for Comments on Environmental Issues The staff of... (EA) that will discuss the environmental impacts of the Pony Express Pipeline Conversion Project involving conversion of facilities from natural gas to oil and construction and operation of new facilities...

  10. KSC-2011-1154

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  11. KSC-2011-1155

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  12. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  13. Revenue Bond Financing Auxiliary Service Facilities Construction at the State Colleges.

    ERIC Educational Resources Information Center

    Maryland Board of Trustees of the State Colleges, Baltimore.

    Since the State of Maryland does not provide funds for the construction of dormitories, dining halls, student activities, buildings, and similar ancillary services, an outline of cost responsibilities for such facilities in the state college system is presented. Based on a discussion of the financing methods for ancillary projects, the role of the…

  14. 30 CFR 285.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 285.651 Section 285.651 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER...

  15. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  16. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  17. 75 FR 13275 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Dimmett 208-382- 7400. EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilities, Right-of-Way Application on Public..., Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and...

  18. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  19. 76 FR 54767 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ..., WA, Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt (MW) Wind Turbine... Proposed Construction, Connection, Operation, and Maintenance of a Pipeline and Associated Facilities at...

  20. Educational Facility Design and Project Based Learning: "The Real Connection"

    ERIC Educational Resources Information Center

    Schrader, David L.; Sole, John

    2009-01-01

    There is a case to be made for the integration of the Project Based Service Learning (PBSL) process and the design and construction of educational facilities. A growing body of research supports the notion that the formulaic educational system of the last hundred years may no longer serve the learning styles of new and future generations. Their…

  1. 38 CFR 17.255 - Applications for grants for programs which include construction projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evidence required by § 17.254, any application for a grant for the construction of any facility, structure... that the rates of pay for laborers and mechanics engaged in construction activities will not be less...

  2. 38 CFR 17.255 - Applications for grants for programs which include construction projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... evidence required by § 17.254, any application for a grant for the construction of any facility, structure... that the rates of pay for laborers and mechanics engaged in construction activities will not be less...

  3. 38 CFR 17.255 - Applications for grants for programs which include construction projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... evidence required by § 17.254, any application for a grant for the construction of any facility, structure... that the rates of pay for laborers and mechanics engaged in construction activities will not be less...

  4. 38 CFR 17.255 - Applications for grants for programs which include construction projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evidence required by § 17.254, any application for a grant for the construction of any facility, structure... that the rates of pay for laborers and mechanics engaged in construction activities will not be less...

  5. 38 CFR 17.255 - Applications for grants for programs which include construction projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... evidence required by § 17.254, any application for a grant for the construction of any facility, structure... that the rates of pay for laborers and mechanics engaged in construction activities will not be less...

  6. The Australian Replacement Research Reactor

    NASA Astrophysics Data System (ADS)

    Kennedy, Shane; Robinson, Robert

    2004-03-01

    The 20-MW Australian Replacement Research Reactor represents possibly the greatest single research infrastructure investment in Australia's history. Construction of the facility has commenced, following award of the construction contract in July 2000, and the construction licence in April 2002. The project includes a large state-of-the-art liquid deuterium cold-neutron source and supermirror guides feeding a large modern guide hall, in which most of the instruments are placed. Alongside the guide hall, there is good provision of laboratory, office and space for support activities. While the facility has "space" for up to 18 instruments, the project has funding for an initial set of 8 instruments, which will be ready when the reactor is fully operational in July 2006. Instrument performance will be competitive with the best research-reactor facilities anywhere, and our goal is to be in the top 3 such facilities worldwide. Staff to lead the design effort and man these instruments have been hired on the international market from leading overseas facilities, and from within Australia, and 7 out of 8 instruments have been specified and costed. At present the instrumentation project carries 10contingency. An extensive dialogue has taken place with the domestic user community and our international peers, via various means including a series of workshops over the last 2 years covering all 8 instruments, emerging areas of application like biology and the earth sciences, and computing infrastructure for the instruments.

  7. 30 CFR 585.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 585.651 Section 585.651 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and...

  8. 30 CFR 585.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 585.651 Section 585.651 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and...

  9. 30 CFR 585.651 - When may I construct complex or significant OCS facilities on my limited lease or any facilities...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facilities on my limited lease or any facilities on my project easement proposed under my GAP? 585.651 Section 585.651 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and...

  10. Water quality facility investigation : summary report.

    DOT National Transportation Integrated Search

    2006-12-01

    The genesis for this research project was a desire to comply with the National Pollutant Discharge Elimination : System (NPDES) as cost effectively as possible. The construction of stormwater handling and treatment facilities is : costly because of t...

  11. The status of LILW disposal facility construction in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan

    2013-07-01

    In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less

  12. 77 FR 23275 - Notice of Availability of the Draft enXco Desert Harvest Solar Farm Project Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ...-way (ROW) authorization to construct, operate, maintain, and decommission a solar photovoltaic (PV... grant to construct, operate, and decommission a solar PV facility on public lands in compliance with... CACA49491] Notice of Availability of the Draft enXco Desert Harvest Solar Farm Project Environmental Impact...

  13. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  14. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  15. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  16. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army... Corporate Operations, Southwestern Power Administration, One West Third, Tulsa, OK 74103, (918) 595-6680 or...

  17. 78 FR 57211 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... rehabilitation design. Taxiway/apron/fuel road pavement replacement. Taxiway/apron/fuel road pavement replacement... Description of Projects Approved for Collection and Use: Taxiway F improvements (design and construction). Drainage ditch improvements (design and construction). Apron C expansion (design and construction...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Lonkhuyzen, R.; Stull, L.; Butler, J.

    The National Institutes of Health (NIH) has proposed to partially fund the construction of the Howard T. Ricketts (HTR) regional biocontainment laboratory (RBL) by the University of Chicago at the U.S. Department of Energy's (DOE's) Argonne National Laboratory in Argonne, Illinois. The HTR Laboratory (HTRL) would be constructed, owned, and operated by the University of Chicago on land leased to it by DOE. The preferred project site is located north of Eastwood Drive and west of Outer Circle Road and is near the biological sciences building. This environmental assessment addresses the potential environmental effects resulting from construction and operation ofmore » the proposed facility. The proposed project involves the construction of a research facility with a footprint up to approximately 44,000 ft{sup 2} (4,088 m{sup 2}). The proposed building would house research laboratories, including Biosafety Level 2 and 3 biocontainment space, animal research facilities, administrative offices, and building support areas. The NIH has identified a need for new facilities to support research on potential bioterrorism agents and emerging and re-emerging infectious diseases, to protect the nation from such threats to public health. This research requires specialized laboratory facilities that are designed, managed, and operated to protect laboratory workers and the surrounding community from accidental exposure to agents. The proposed HTRL would provide needed biocontainment space to researchers and promote the advancement of knowledge in the disciplines of biodefense and emerging and re-emerging infectious diseases. Several alternatives were considered for the location of the proposed facility, as well as a no action alternative. The preferred alternative includes the construction of a research facility, up to 44,000 ft{sup 2} (4,088 m{sup 2}), at Argonne National Laboratory, a secure government location. Potential impacts to natural and cultural resources have been evaluated in this document. The proposed activities would result in the conversion of approximately 4 acres (2 ha) of old field and open woodland for the proposed facility and landscaped areas. Impacts of the proposed project on the following resources would be minor or negligible: human health, socioeconomics, air quality, noise levels, water quality, waste management, land use, the visual environment, cultural resources, soils, terrestrial biota, wetlands or aquatic biota, threatened and endangered species, transportation, utilities and services, and environmental justice. This environmental assessment has been completed to satisfy the requirements of the National Environmental Policy Act of 1969 and has been prepared in accordance with NIH guidelines and in coordination with federal, state, and local agency requirements. On the basis of the results of this assessment, impacts to environmental resources from the proposed project would be minor or negligible, provided that the project is implemented in accordance with the impact avoidance and mitigation measures described herein.« less

  19. Human Health Science Building Geothermal Heat Pump Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidel, James

    2014-12-22

    The grant objectives of the DOE grant funded project have been successfully completed. The Human Health Building (HHB) was constructed and opened for occupancy for the Fall 2012 semester of Oakland University. As with any large construction project, some issues arose which all were overcome to deliver the project on budget and on time. The facility design is a geothermal / solar-thermal hybrid building utilizing both desiccant dehumidification and variable refrigerant flow heat pumps. It is a cooling dominant building with a 400 ton cooling design day load, and 150 ton heating load on a design day. A 256 verticalmore » borehole (320 ft depth) ground source heat pump array is located south of the building under the existing parking lot. The temperature swing and performance over 2013 through 2015 shows the ground loop is well sized, and may even have excess capacity for a future building to the north (planned lab facility). The HHB achieve a US Green Building Counsel LEED Platinum rating by collecting 52 of the total 69 available LEED points for the New Construction v.2 scoring checklist. Being Oakland's first geothermal project, we were very pleased with the building outcome and performance with the energy consumption approximately 1/2 of the campus average facility, on a square foot basis.« less

  20. Extremely large telescopes as a motor of socio-economic development and implications of their construction and installation

    NASA Astrophysics Data System (ADS)

    Burgos-Martin, J.; Sanchez-Padron, M.; Sanchez, F.; Martinez-Roger, Carlos

    2004-07-01

    Large-Scale observing facilities are scarce and costly. Even so, the perspective to enlarge or to increase the number of these facilities are quite real and several projects are undertaking their first steps in this direction. These costly facilities require the cooperation of highly qualified institutions, able to undertake the project from the scientific and technological point of view, as well as the vital collaboration and effective support of several countries, at the highest level, able to provide the necessary investment for their construction. Because of these technological implications and the financial magnitude of these projects, their impact goes well beyond the international astrophysical community. We propose to carry out a study on the socio-economic impact from the construction and operation of an Extremely Large Telescope of class 30 - 100 m. We plan to approach several aspects such as its impact in the promotion of the employment; social, educational and cultural integration of the population; the impulse of industries; its impact on the national and international policies on research; environmental issues; etc. We will also analyze the financial instruments available, and those special aids only accessible for some countries and regions to encourage their participation in projects of this magnitude.

  1. Baseline process description for simulating plutonium oxide production for precalc project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pike, J. A.

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO 2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as wellmore » as process and facility design details necessary for multi-scale, multi-physics models are provided.« less

  2. Inadequate Contract Oversight of Military Construction Projects in Afghanistan Resulted in Increased Hazards to Life and Safety of Coalition Forces

    DTIC Science & Technology

    2013-03-08

    applicable fire protection standards for two of the three projects we reviewed that required a fire sprinkler system . Specifically, the Secure...RSOI and Command and Control facilities do not have fire sprinkler systems as required by Unified Facilities Criteria 3-600-01, Section 4-2.2...stated that, as such, those facilities did not need fire sprinkler systems . Based on the justification provided by the Air Force on the DD Form 1391s

  3. Regional hospital improves efficiency with co-generation retrofit.

    PubMed

    Knutson, D; Anderson, L

    1999-11-01

    Feasibility analysis of the co-generation retrofit of the Red Deer Regional Hospital pointed to a reasonable payback of capital cost and increased efficiency in operation of the facility. Budget restrictions nearly stopped the project from proceeding. Innovative construction procedures proposed by the Facility Management Group, in particular, Mr Keith Metcalfe, Director of Maintenance, allowed a worthwhile project to reach successful completion. We feel that this model can perhaps be used by similar facilities in the future to achieve their energy efficiency goals.

  4. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    NASA Astrophysics Data System (ADS)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  5. High-rise construction as a method for architectural development of megapolises

    NASA Astrophysics Data System (ADS)

    Kankhva, Vadim

    2018-03-01

    The article analyzes the current state of urban development in Moscow, there are revealed the insights into pattern of large investment projects. The regulatory framework as well as the state and the forecast of housing funds are scrutinized. A number of problems, that are related to the implementation of high-rise construction projects at all stages of the life cycles, are highlighted by the example of unique facilities, which are under construction or have already been built. Substantiation of high-rise construction by the transport hubs in megapolises is given. There are also considered main advantages of Moscow renovation project and criticism against it.

  6. Government conceptual estimating for contracting and management

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1986-01-01

    The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

  7. Cryogenic ribbon-cutting

    NASA Image and Video Library

    2011-03-30

    NASA cut the ribbon on a new cryogenics control center at John C. Stennis Space Center on March 30. The new facility is part of a project to strengthen Stennis facilities to withstand the impacts of future storms like hurricane Katrina in 2005. Participants in the ribbon-cutting included (l to r): Jason Zuckerman, director of project management for The McDonnel Group; Keith Brock, director of the NASA Project Directorate at Stennis; Stennis Deputy Director Rick Gilbrech; Steve Jackson of Jacobs Technology; and Troy Frisbie, Cryo Control Center Construction project manager for NASA Center Operations at Stennis.

  8. 30 CFR 285.650 - When may I begin conducting activities under my GAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and... involve a project easement or the construction of facilities on the OCS that MMS has deemed to be complex...

  9. Cold Vacuum Drying (CVD) Facility Acceptance for Beneficial Use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRISBIN, S.A.

    2000-01-05

    This document provides a checklist of the items required for turnover of the Cold Vacuum Drying Facility from the Construction Projects organization to the Operations organization. This document will be updated periodically to document completion of additional deliverables.

  10. Code JEF Facilities Engineering Home Page for the Internet

    NASA Technical Reports Server (NTRS)

    Mahaffey, Valerie A.; Harrison, Marla J. (Technical Monitor)

    1995-01-01

    There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.

  11. Building the "fable hospital"--the CEO's perspective: an interview with Michael H. Covert, president and chief executive officer, Palomar Pomerado Health. Interview by David A Tam.

    PubMed

    Covert, Michael

    2012-01-01

    Hospital construction is a significant event in any health system. The financial implications are great, especially at a time of shrinking capital resources. Personnel are affected, as are the processes to perform their tasks. Often, new facilities are catalysts that change organizational culture; it has been clearly shown that new facilities have a positive impact on patient satisfaction scores. The members of the C-suite of a hospital/health system play important roles in construction projects. However, no one is more critical to the success of such major endeavors than the chief executive officer (CEO). The CEO sets the tone for the project, giving direction to the design and construction process that may have implications for the rest of the organization. Palomar Pomerado Health (PPH) is the largest public health district in California. In 2002, the PPH governing board authorized the creation of a new facility master plan for the district, which included the construction of a replacement facility for its tertiary care trauma center. The new Palomar Medical Center is slated to open in August 2012. HERD had the opportunity to speak with PPH CEO Michael H. Covert on the role of the CEO in the building of this "fable hospital".

  12. Preliminary Plans Presented for Construction of John F. Kennedy School and Community Center- 1966 Bond Fund Project No. PS42-62-785-7 and Neighborhood Facilities Grant Project No. GA. N-7.

    ERIC Educational Resources Information Center

    Atlanta Board of Education, GA.

    A proposed project which is a result of the cooperative efforts of many agencies is described. The planned facility will offer to residents of the community, a multitude of needed services which have never been brought together under one roof. The center will include a middle school of grades six to eight for approximately 1,050 students. The…

  13. Sewage sludge pasteurization by gamma radiation: A Canadian demonstration project — 1988-91

    NASA Astrophysics Data System (ADS)

    Swinwood, Jean F.; Wilson, Bruce K.

    Nordion International Inc. and a Canadian city, in cooperation with the Federal & Provincial Ministries of the Environment, began a project in 1988 to construct and operate a commercial-scale sewage sludge pasteurization facility using gamma radiation technology. The facility is scheduled to begin operations in 1991. This paper discusses the objectives and scope of the project, the design of the irradiation system, and the plans to market the pasteurized sludge as a high-value, organic soil conditioner and fertilizer.

  14. KSC-03pd0578

    NASA Image and Video Library

    2003-03-04

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  15. KSC-03PD-0578

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  16. Food irradiation: Technology transfer to developing countries

    NASA Astrophysics Data System (ADS)

    Kunstadt, Peter

    This paper discusses Nordion's experiences to-date with the Food Irradiation Project in Thailand (1987-1990). This project will enable the Government of Thailand and the Thai food industry to benefit from established Canadian technology in food irradiation. It includes the design and the construction in Thailand of a multipurpose irradiation facility, similar to the Canadian Irradiation Centre. In addition Canada provides the services, for extended periods of time, of construction and installation management and experts in facility operation, maintenance and training. The Technology Transfer component is a major part of the overall Thai Food Irradiation Project. Its purpose is to familiarize Thai government and industry personnel with Canadian requirements in food regulations and distribution and to conduct market and consumer tests of selected Thai irradiated food products in Canada, once the products have Canadian regulatory approval. On completion of this project, Thailand will have the necessary facility, equipment and training to continue to provide leadership in food irradiation research, as well as scientific and technical support to food industries not only in Thailand by also in the ASEAN region.

  17. 76 FR 70809 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    .... Pavement condition index airfield inspection. Brief Description of Withdrawn Projects: Safety management... 1U19R and 7R/25L intersection repaving, construction. Perimeter road bridge over Howell Avenue, design. Inline baggage security, construction. Gate D56 improvements, design and construction. Snow removal...

  18. Using Construction Management for Public and Institutional Facilities.

    ERIC Educational Resources Information Center

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  19. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  20. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  1. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  2. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  3. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  4. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  5. 14 CFR Appendix C to Part 152 - Procurement Procedures and Requirements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... The sponsor shall establish procedures for procurement of supplies, equipment, construction, and... other State, possession, or territory of the United States in the construction of a project. 3. Bid guarantee. All bids for construction or facility improvement in excess of $100,000 shall be accompanied by a...

  6. A Principal's Guide to On-Site School Construction

    ERIC Educational Resources Information Center

    Brenner, William A.

    2009-01-01

    This paper addresses construction that takes place in or near the school building while school is in session--the most difficult kind of construction to manage. Success largely depends upon the preparation, competence, and goodwill of the school district's facility staff, the project architect/engineer, the contractor, and local school…

  7. ALTERNATE METHODS OF MANURE HANDLING

    EPA Science Inventory

    The objectives of this research project were to (a) construct an inexpensive storage facility for solid dairy cow manure, (b) evaluate its performance and the extent of pollutants in runoff from storage facilities, and (c) determine current manure handling practices in Vermont an...

  8. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, Brian C.; Duke, Bill B.

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adultmore » and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.« less

  9. KSC-2009-6456

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates, Eric Silagy, Florida Power & Light Company vice president and chief development officer, for his part in the construction of NASA's first large-scale solar power generation facility as Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  10. KSC-2009-6455

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, for his part in the construction of NASA's first large-scale solar power generation facility as Eric Silagy, Florida Power & Light Company vice president and chief development officer, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  11. 10 CFR 609.12 - Project Costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...

  12. 42 CFR 136.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...

  13. 10 CFR 609.12 - Project Costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...

  14. 10 CFR 609.12 - Project Costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...

  15. 10 CFR 609.12 - Project Costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...

  16. 10 CFR 609.12 - Project Costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... incurred in the design, engineering, financing, construction, startup, commissioning and shakedown of the... rental of real property, including engineering fees, surveys, title insurance, recording fees, and legal... transportation for facility design, construction, startup, commissioning and shakedown; (3) Costs of equipment...

  17. Design and construction of the X-2 two-stage free piston driven expansion tube

    NASA Technical Reports Server (NTRS)

    Doolan, Con

    1995-01-01

    This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.

  18. Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE): Conceptual Design Report. Volume 3: Long-Baseline Neutrino Facility for DUNE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strait, James; McCluskey, Elaine; Lundin, Tracy

    2016-01-21

    This volume of the LBNF/DUNE Conceptual Design Report covers the Long-Baseline Neutrino Facility for DUNE and describes the LBNF Project, which includes design and construction of the beamline at Fermilab, the conventional facilities at both Fermilab and SURF, and the cryostat and cryogenics infrastructure required for the DUNE far detector.

  19. Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conroy, Kevin W.; Vandergaast, Gerald

    2012-07-01

    The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated intomore » the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)« less

  20. Environmental Security and Infrastructure in Poland: Impacts from the Demise of the Former Soviet Union

    DTIC Science & Technology

    1996-10-01

    construction of facilities to mix saline water with fly ash from power plants to neutralize mine leachate ; • construction of facilities to produce...developing another new approach to soil remediation called Phytoremediation . The Institute is hopeful that this project will be instrumental in cleaning...million. Phytoremediation uses certain types of plants to stabilize, mineralize and remove the heavy metals in the soil through root uptake. The

  1. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  2. Public-Private Ventures in Bachelor Quarters: A Solution to the Loss of Military Construction Projects. Volume 1. Findings, Conclusions, and Recommendations

    DTIC Science & Technology

    1990-06-01

    restaurants, and other amenities. Although the food and beverage facilities at the National Medical Center are ample, they are not targeted for the...against including a club and restaurant in the BOQ project. Current on-base food and beverage facilities are sufficient to serve the additional demand that...taxing its capacity. In fact, tlie base has six food and beverage facilities that provide a variety of choices, and adding a seventh in the BOQ would

  3. 340 Facility secondary containment and leak detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bendixsen, R.B.

    1995-01-31

    This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.

  4. REAL TIME CONTROL OF SEWERS: US EPA MANUAL

    EPA Science Inventory

    The problem of sewage spills and local flooding has traditionally been addressed by large scale capital improvement programs that focus on construction alternatives such as sewer separation or construction of storage facilities. The cost of such projects is often high, especiall...

  5. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE... NATURAL GAS ACT Balance Sheet Chart of Accounts § 367.1070 Account 107, Construction work in progress. (a... research, development, and demonstration projects for construction of facilities are to be included in a...

  6. HEAVY METALS IN RECOVERED FINES FOR CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING FACILITIES IN FLORIDA

    EPA Science Inventory

    A major product recovered from the processing and recycling of construction and demolition (C&D) debris is screened soil, also referred to as fines. A proposed reuse option for C&D debris fines is fill material, typically in construction projects as a substitute for natural soil....

  7. TAC Proton Accelerator Facility: The Status and Road Map

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Algin, E.; Akkus, B.; Caliskan, A.

    2011-06-28

    Proton Accelerator (PA) Project is at a stage of development, working towards a Technical Design Report under the roof of a larger-scale Turkish Accelerator Center (TAC) Project. The project is supported by the Turkish State Planning Organization. The PA facility will be constructed in a series of stages including a 3 MeV test stand, a 55 MeV linac which can be extended to 100+ MeV, and then a full 1-3 GeV proton synchrotron or superconducting linac. In this article, science applications, overview, and current status of the PA Project will be given.

  8. Cryogenic ribbon-cutting

    NASA Image and Video Library

    2011-03-30

    NASA cut the ribbon on a new cryogenics control center at John C. Stennis Space Center on March 30. The new facility is part of a project to strengthen Stennis facilities to withstand the impacts of future storms like hurricane Katrina in 2005. Participants in the ribbon-cutting included (l to r): Jason Zuckerman, director of project management for The McDonnel Group; Keith Brock, director of the NASA Project Directorate at Stennis; Stennis Deputy Director Rick Gilbrech; Steve Jackson, outgoing program manager of the Jacobs Technology NASA Test Operations Group; and Troy Frisbie, Cryo Control Center Construction project manager for NASA Center Operations at Stennis.

  9. Exhibit of School Architecture, 1996. Special Section.

    ERIC Educational Resources Information Center

    Texas Architect, 1997

    1997-01-01

    Presents selected winners of the Texas 1996 Exhibit of School Architecture Design Competition. The Caudill and honor award-winning projects are listed along with facility photos, brief descriptions, project credits, and the names of the construction companies used. (GR)

  10. Exhibit of School Architecture, 1997. Special Section.

    ERIC Educational Resources Information Center

    Texas Architect, 1998

    1998-01-01

    Presents selected winners of the Texas 1997 Exhibit of School Architecture Design Competition. The Caudill and honor award winning projects are listed along with facility photos, brief descriptions, project credits, and the names of the construction companies used. (GR)

  11. 1991 survey of recent health sciences library building projects.

    PubMed Central

    Ludwig, L T

    1992-01-01

    Twenty health sciences libraries reported building planning, expansion, or construction of new facilities in the association's second annual survey of recent building projects. Six projects are new, freestanding structures in which the library occupies all or a major portion of the space. Six other projects are part of new construction for separately administered units in which the library is a major tenant. The final eight projects involve additions to or renovations of existing space. Seven of these twenty libraries were still in projected, predesign, or design stages of awaiting funding approval; of those seven, five were not prepared to release the requested information. Six projects are reported here as illustrative of current building projects. Images PMID:1600420

  12. Comparison of Navy and Private-Sector Construction Costs

    DTIC Science & Technology

    1997-09-01

    contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar

  13. MAN-004 Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-07-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less

  14. DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballard, D.L.; Brown, W.W.; Harrison, C.W.

    Design and construction specifications to be followed in the development of the reactor, its associated systems and experimental facilities, and the housing and required services for the facility are presented. The testing procedures to be used are outlined. (D.C.W.)

  15. Engineering monitoring expert system's developer

    NASA Technical Reports Server (NTRS)

    Lo, Ching F.

    1991-01-01

    This research project is designed to apply artificial intelligence technology including expert systems, dynamic interface of neural networks, and hypertext to construct an expert system developer. The developer environment is specifically suited to building expert systems which monitor the performance of ground support equipment for propulsion systems and testing facilities. The expert system developer, through the use of a graphics interface and a rule network, will be transparent to the user during rule constructing and data scanning of the knowledge base. The project will result in a software system that allows its user to build specific monitoring type expert systems which monitor various equipments used for propulsion systems or ground testing facilities and accrues system performance information in a dynamic knowledge base.

  16. 76 FR 54766 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...

  17. How to Select a Project Delivery Method for School Facilities

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    In this article, the author discusses and explains three project delivery methods that are commonly used today in the United States. The first project delivery method mentioned is the design-bid-build, which is still the predominant method of project delivery for public works and school construction in the United States. The second is the…

  18. Project Village conceptual plans. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming; proposed housing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less

  19. National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W J; Moses, E; Warner, B

    2000-12-07

    The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  20. The National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W.J.; Moses, E.; Warner, B.

    2000-12-07

    The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  1. The challenge of logistics facilities development

    NASA Technical Reports Server (NTRS)

    Davis, James R.

    1987-01-01

    The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

  2. STORMWATER BEST MANAGEMENT PRACTICES TEST FACILITY - SWALES

    EPA Science Inventory

    The NRMRL swale evaluation is part of a larger collection of long-term research projects that evaluates many Best Management Practices. EPA has ongoing research examining the performance of constructed wet lands, and detention and retention ponds. Other projects will evaluate ra...

  3. Infection control in design and construction work.

    PubMed

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  4. Title I preliminary engineering for: A. S. E. F. solid waste to methane gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1976-01-01

    An assignment to provide preliminary engineering of an Advanced System Experimental Facility for production of methane gas from urban solid waste by anaerobic digestion is documented. The experimental facility will be constructed on a now-existing solid waste shredding and landfill facility in Pompano Beach, Florida. Information is included on: general description of the project; justification of basic need; process design; preliminary drawings; outline specifications; preliminary estimate of cost; and time schedules for design and construction of accomplishment of design and construction. The preliminary cost estimate for the design and construction phases of the experimental program is $2,960,000, based on Dec.more » 1975 and Jan. 1976 costs. A time schedule of eight months to complete the Detailed Design, Equipment Procurement and the Award of Subcontracts is given.« less

  5. Analysis of renewable energy projects' implementation in Russia

    NASA Astrophysics Data System (ADS)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  6. Building information modelling (BIM) after ten years: Malaysian construction players’ perception of BIM

    NASA Astrophysics Data System (ADS)

    Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.

    2017-08-01

    Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.

  7. Surveying School Facilities Needs.

    ERIC Educational Resources Information Center

    Weichel, Harry J.; Dennell, James

    1990-01-01

    Ralston (Nebraska) Public School District's communitywide survey helped set school facilities priorities while keeping the district's finite resources firmly in mind. With an outline of maintenance costs for the next 10 years, the district can develop a strategic construction schedule. The board also has the option of financing projects through a…

  8. KSC-2009-6454

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, recipients of a NASA Team Award for their parts in the successful construction of NASA's first large-scale solar power generation facility pose for a group portrait. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  9. Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…

  10. 76 FR 18751 - National Fuel Gas Supply Corporation; Tennessee Gas Pipeline Company; Notice of Intent To Prepare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Prepare an Environmental Assessment for the Proposed Northern Access Project and Station 230c Project... County, Pennsylvania. TGP's Station 230C Project would involve construction and operation of facilities... conduct two onsite environmental reviews of National Fuel's proposed East Aurora Compressor Station site...

  11. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  12. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  13. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  14. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  15. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  16. "Wrapping Up" Your Construction Insurance.

    ERIC Educational Resources Information Center

    Ferraro, Mark

    1998-01-01

    School facility managers are beginning to use a special insurance-management technique called wrap-up. The project owner purchases a bulk construction insurance policy consisting of general liability, excess liability, workers' compensation, and builders' risk insurance. Wrap-ups ensure competitive pricing, safety incentives, lower claims costs,…

  17. 18 CFR 4.41 - Contents of application.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... regarding the acceptability of the recommendations; (ii) The results of surveys, inventories, and subsurface... educational facilities and programs; (iv) On-site manpower requirements and payroll during and after project... incremental local government revenues that would result from the construction of the proposed project...

  18. 18 CFR 4.41 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... regarding the acceptability of the recommendations; (ii) The results of surveys, inventories, and subsurface... educational facilities and programs; (iv) On-site manpower requirements and payroll during and after project... incremental local government revenues that would result from the construction of the proposed project...

  19. 18 CFR 4.41 - Contents of application.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... regarding the acceptability of the recommendations; (ii) The results of surveys, inventories, and subsurface... educational facilities and programs; (iv) On-site manpower requirements and payroll during and after project... incremental local government revenues that would result from the construction of the proposed project...

  20. 18 CFR 4.41 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... regarding the acceptability of the recommendations; (ii) The results of surveys, inventories, and subsurface... educational facilities and programs; (iv) On-site manpower requirements and payroll during and after project... incremental local government revenues that would result from the construction of the proposed project...

  1. 18 CFR 4.41 - Contents of application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... regarding the acceptability of the recommendations; (ii) The results of surveys, inventories, and subsurface... educational facilities and programs; (iv) On-site manpower requirements and payroll during and after project... incremental local government revenues that would result from the construction of the proposed project...

  2. Construction and comparison of Louisiana's conventional and alternative base courses under accelerated loading

    DOT National Transportation Integrated Search

    1998-08-01

    The report describes the first testing series, Phase, of the first project, Experiment 1, with the Louisiana Transportation Research Center Accelerated Loading Facility. The background to the project is described and details of the trial pavements si...

  3. [Architecture and movement].

    PubMed

    Rivallan, Armel

    2012-01-01

    Leading an architectural project means accompanying the movement which it induces within the teams. Between questioning, uncertainty and fear, the organisational changes inherent to the new facility must be subject to constructive and ongoing exchanges. Ethics, safety and training are revised and the unit projects are sometimes modified.

  4. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.« less

  5. KSC-2011-1395

    NASA Image and Video Library

    2011-02-08

    CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center in Florida hosts a ribbon-cutting ceremony at a new 18,500-square-foot Electrical Maintenance Facility (EMF) officially opening for business. Addressing the attendees is NASA Construction of Facility Project Manager Nick Rivieccio. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder

  6. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 13, Tracks 20, 21 and Workshop

    DTIC Science & Technology

    2005-08-04

    Dennis Mekkers and Daniel M. Katz Current Research in Fate Current Research in Fate & Transport of Chemical and Biological Contaminants in Water... Grafenwoehr Health/Dental Clinic 33U.S. Army Health Facility Planning Agency • $58M in Construction, $86M in Design • 23 Projects in Pipeline • HFPA...Troop Medical Clinic Grafenwoehr Health/Dental Clinic 38U.S. Army Health Facility Planning Agency Army “Medical BRAC” Projects Afghanistan -- CPT

  7. 39 CFR 776.8 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... trails, or boardwalks, including signs, the primary purposes of which are public education... Architectural Barriers Act or postal accessibility standards; (3) Any facility construction project deemed...

  8. 30 CFR 585.640 - What is a General Activities Plan (GAP)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....640 Section 585.640 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans... technology devices and onshore and support facilities that you will construct and use for your project...

  9. 30 CFR 585.640 - What is a General Activities Plan (GAP)?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....640 Section 585.640 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans... technology devices and onshore and support facilities that you will construct and use for your project...

  10. 30 CFR 285.650 - When may I begin conducting activities under my GAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... GAP? 285.650 Section 285.650 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE... conducting the approved activities that do not involve a project easement or the construction of facilities...

  11. 30 CFR 585.640 - What is a General Activities Plan (GAP)?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....640 Section 585.640 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans... technology devices and onshore and support facilities that you will construct and use for your project...

  12. 75 FR 60745 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy... construction and operation of the nuclear facility portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos...

  13. Coal cleaning: An underutilized solution?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Godfrey, R.L.

    1995-12-31

    Custom Coals Corporation is based in Pittsburgh, Pennsylvania. It is involved in the construction and operation of advanced coal cleaning facilities. The company has initially chosen to focus on Pennsylvania`s vast reserves of coal, because these coal provide a superior feedstock for the Technology. In a $76 million project co-sponsored by the U.S. Department of Energy, Custom Coals is constructing its first coal cleaning facility. The DOE chose to participate with the company in the project pursuant to a competition it sponsored under Round IV of Its Clean Cod Technology program. Thirty-one companies submitted 33 projects seeking approximately $2.3 billionmore » of funding against the $600 million available. The company`s project was one of nine proposals accepted and was the only pre-combustion cleaning technology awarded. The project includes both the construction of a 500 ton per hour coal cleaning facility utilizing the company`s proprietary technologies and a series of power plant test bums on a variety of U.S. coals during a 12-month demonstration program. Three U.S. coal seams - Sewickley, Lower Freeport and Illinois No. 5 - will supply the initial feedstock for the demonstration project. These seams represent a broad range of raw cod qualifies. The processed coals will then be distributed to a number of generating stations for combustion. The 300 megawatt Martins Creek Plant of Pennsylvania Power & Light Co., near Allentown, Pennsylvania, will burn Carefree Coal, the 60 megawatt Whitewater Valley Power Station of Richmond Power and Light (in Indiana) and the Ashtabula, Ohio unit of Centerior Energy will burn Self-Scrubbing Coal. Following these demonstrations, the plant will begin full-scale commercial operation, providing two million tons of Pennsylvania compliance coals to electric power utilities.« less

  14. The NOXSO clean coal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, J.B.; Woods, M.C.; Friedrich, J.J.

    1997-12-31

    The NOXSO Clean Coal Project will consist of designing, constructing, and operating a commercial-scale flue-gas cleanup system utilizing the NOXSO Process. The process is a waste-free, dry, post-combustion flue-gas treatment technology which uses a regenerable sorbent to simultaneously adsorb sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) from flue gas from coal-fired boilers. The NOXSO plant will be constructed at Alcoa Generating Corporation`s (AGC) Warrick Power Plant near Evansville, Indiana and will treat all the flue gas from the 150-MW Unit 2 boiler. The NOXSO plant is being designed to remove 98% of the SO{sub 2} and 75% ofmore » the NO{sub x} when the boiler is fired with 3.4 weight percent sulfur, southern-Indiana coal. The NOXSO plant by-product will be elemental sulfur. The elemental sulfur will be shipped to Olin Corporation`s Charleston, Tennessee facility for additional processing. As part of the project, a liquid SO{sub 2} plant has been constructed at this facility to convert the sulfur into liquid SO{sub 2}. The project utilizes a unique burn-in-oxygen process in which the elemental sulfur is oxidized to SO{sub 2} in a stream of compressed oxygen. The SO{sub 2} vapor will then be cooled and condensed. The burn-in-oxygen process is simpler and more environmentally friendly than conventional technologies. The liquid SO{sub 2} plant produces 99.99% pure SO{sub 2} for use at Olin`s facilities. The $82.8 million project is co-funded by the US Department of Energy (DOE) under Round III of the Clean Coal Technology program. The DOE manages the project through the Pittsburgh Energy Technology Center (PETC).« less

  15. H-Coal Pilot Plant Phase II construction, Catlettsburg, Kentucky. Final construction management report, December 1976-February 1980. [February, 1977 to approximately January, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-03-01

    This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less

  16. Structural and Functional Concepts in Current Mouse Phenotyping and Archiving Facilities

    PubMed Central

    Kollmus, Heike; Post, Rainer; Brielmeier, Markus; Fernández, Julia; Fuchs, Helmut; McKerlie, Colin; Montoliu, Lluis; Otaegui, Pedro J; Rebelo, Manuel; Riedesel, Hermann; Ruberte, Jesús; Sedlacek, Radislav; de Angelis, Martin Hrabě; Schughart, Klaus

    2012-01-01

    Collecting and analyzing available information on the building plans, concepts, and workflow from existing animal facilities is an essential prerequisite for most centers that are planning and designing the construction of a new animal experimental research unit. Here, we have collected and analyzed such information in the context of the European project Infrafrontier, which aims to develop a common European infrastructure for high-throughput systemic phenotyping, archiving, and dissemination of mouse models. A team of experts visited 9 research facilities and 3 commercial breeders in Europe, Canada, the United States, and Singapore. During the visits, detailed data of each facility were collected and subsequently represented in standardized floor plans and descriptive tables. These data showed that because the local needs of scientists and their projects, property issues, and national and regional laws require very specific solutions, a common strategy for the construction of such facilities does not exist. However, several basic concepts were apparent that can be described by standardized floor plans showing the principle functional units and their interconnection. Here, we provide detailed information of how individual facilities addressed their specific needs by using different concepts of connecting the principle units. Our analysis likely will be valuable to research centers that are planning to design new mouse phenotyping and archiving facilities. PMID:23043807

  17. Final Environmental Assessment for the Construction of a Temporary Lodging Facility, Eglin Air Force Base, FL

    DTIC Science & Technology

    2012-03-01

    amplitude), frequency (pitch), and duration. Each of these characteristics plays a role in determining a noise’s intrusiveness and level of impact on a...1 for the Construction of a Temporary Lodging Facility Eglin Air Force Base, FL 6. LIST OF PREPARERS AND CONTRIBUTORS Name/Title Project Role ...categorized as one of the following: _ Federal As.sistAnce to Sts.te o r Local Gonrnment (IS CFR 930, Subpart F). Agtncies stre required to evaluate

  18. Feasibility Study & Design of Brightfield Solar Farm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Law, Susan

    2014-09-28

    This Congressionally Directed Project originally provided funds to the Township of Lower Providence, Pennsylvania for the purpose of investigating the potential for a renewable energy generation facility to make beneficial reuse of a closed landfill located within the Township, known as Moyer Landfill. Early in the course of the project, it was determined through collaboration and discussion with DOE to alter the scope of the project to include a feasibility assessment of a landfill solar project, as well as to construct a demonstration solar project at the municipal facilities to provide an educational and community outreach opportunity for the Townshipmore » to offer regarding solar photovoltaic (“PV”) electricity generation.« less

  19. World Bank oil-pipeline project designed to prevent HIV transmission.

    PubMed

    Kigotho, A W

    1997-11-29

    A World Bank-funded oil pipeline project, in Chad and Cameroon, is the first large-scale construction project in sub-Saharan Africa to incorporate an HIV/AIDS prevention component. The project entails the development of oil fields in southern Chad and construction of 1100 km of pipeline to port facilities on Cameroon's Atlantic coast. 3000 construction workers from the two countries will be employed between 1998 and 2001, including about 600 truck drivers. In some areas along the pipeline route, 50% of the prostitutes (who are frequented by truck drivers) are HIV-infected. The HIV/AIDS intervention aims to prevent HIV and sexually transmitted diseases (STDs) among project workers through social marketing of condoms, treatment of STDs in prostitutes along the route, and health education to modify high-risk behaviors. The program is considered a test case for African governments and donors interested in whether the integration of a health component in major construction projects can avoid AIDS epidemics in affected countries.

  20. Sports Fields: A Manual for Design Construction and Maintenance.

    ERIC Educational Resources Information Center

    Puhalla, Jim; Krans, Jeff; Goatley, Mike

    Comprehensive technical reference information is provided for those responsible for the design, construction, renovation, or maintenance of sports grounds. Chapters illustrate specific design elements of all popular sports facilities, and explain how those elements are integrated in a successful project; explore commonly encountered sports field…

  1. An Assessment of Water Demand and Availability to meet Construction and Operational Needs for Large Utility-Scale Solar Projects in the Southwestern United States

    NASA Astrophysics Data System (ADS)

    Klise, G. T.; Tidwell, V. C.; Macknick, J.; Reno, M. D.; Moreland, B. D.; Zemlick, K. M.

    2013-12-01

    In the Southwestern United States, there are many large utility-scale solar photovoltaic (PV) and concentrating solar power (CSP) facilities currently in operation, with even more under construction and planned for future development. These are locations with high solar insolation and access to large metropolitan areas and existing grid infrastructure. The Bureau of Land Management, under a reasonably foreseeable development scenario, projects a total of almost 32 GW of installed utility-scale solar project capacity in the Southwest by 2030. To determine the potential impacts to water resources and the potential limitations water resources may have on development, we utilized methods outlined by the Bureau of Land Management (BLM) to determine potential water use in designated solar energy zones (SEZs) for construction and operations & maintenance (O&M), which is then evaluated according to water availability in six Southwestern states. Our results indicate that PV facilities overall use less water, however water for construction is high compared to lifetime operational water needs. There is a transition underway from wet cooled to dry cooled CSP facilities and larger PV facilities due to water use concerns, though some water is still necessary for construction, operations, and maintenance. Overall, ten watersheds, 9 in California, and one in New Mexico were identified as being of particular concern because of limited water availability. Understanding the location of potentially available water sources can help the solar industry determine locations that minimize impacts to existing water resources, and help understand potential costs when utilizing non-potable water sources or purchasing existing appropriated water. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  2. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oilymore » wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.« less

  3. Building Information Modeling (BIM) Primer. Report 1: Facility Life-Cycle Process and Technology Innovation

    DTIC Science & Technology

    2012-08-01

    Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology Innovation In fo...is unlimited. ERDC/ITL TR-12-2 August 2012 Building Information Modeling ( BIM ) Primer Report 1: Facility Life-cycle Process and Technology...and to enhance the quality of projects through the design, construction, and handover phases. Building Information Modeling ( BIM ) is a

  4. 10 CFR 609.4 - Submission of Pre-Applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assets or facilities); (c) A business plan which includes an overview of the proposed project, including... project investment, development, construction, operation and maintenance; (2) A description of the new or...-Application these requirements are addressed; (d) A financing plan overview describing: (1) The amount of...

  5. 75 FR 16786 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar... No. 20100107, Draft EIS, BLM, CA, Calico Solar Project, Proposed Solar Thermal Electricity Generation... 04/02/2010. EIS No. 20100054, Draft EIS, NASA, VA, Wallops Flight Facility, Shoreline Restoration and...

  6. Design and construction of coal/biomass to liquids (CBTL) process development unit (PDU) at the University of Kentucky Center for Applied Energy Research (CAER)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Placido, Andrew; Liu, Kunlei; Challman, Don

    This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will producemore » research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in some detail in this report, along with lessons learned.« less

  7. High-Pressure Turbulent Flame Speeds and Chemical Kinetics of Syngas Blends with and without Impurities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, Eric; Mathieu, Olivier; Morones, Anibal

    This Final Report documents the entire four years of the project, from October 1, 2013 through September 30, 2017. This project was concerned with the chemical kinetics of fuel blends with high-hydrogen content in the presence of impurities. Emphasis was also on the design and construction of a new, high-pressure turbulent flame speed facility and the use of ignition delay times and flame speeds to elucidate the diluent and impurity effects on the fuel chemistry at gas turbine engine conditions and to also validate the chemical kinetics models. The project was divided into five primary tasks: 1) Project Management andmore » Program Planning; 2) Turbulent Flame Speed Measurements at Atmospheric Pressure; 3) Experiments and Kinetics of Syngas Blends with Impurities; 4) Design and Construction of a High-Pressure Turbulent Flame Speed Facility; and 5) High-Pressure Turbulent Flame Speed Measurements. Details on the execution and results of each of these tasks are provided in the main report.« less

  8. Methodology for determining the investment attractiveness of construction of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Nezhnikova, Ekaterina; Kashirin, Valentin; Davydova, Yana; Kazakova, Svetlana

    2018-03-01

    The article presents the analysis of the existing methods for assessing the investment attractiveness of high-rise construction. The authors determined and justified the primary choice of objects and territories that are the most attractive for the development of high-rise construction. A system of risk indicators has been developed that allow making a quantitative adjustment for a particular project in the evaluation of the efficiency of investment projects. The study is aimed at developing basic methodological concepts for a comparative evaluation of the prospects of construction of high-rise facilities that allow to take into consideration the features of investment in construction and to enable quantitative evaluation of the investment effectiveness in high-rise construction.

  9. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  10. Fostering Success Within the Cyclic Workforce: Seminole Community College's Innovative Approach to Helping Apprenticeship Students Live, Work, and Learn

    ERIC Educational Resources Information Center

    Garlich, Michael; Tesinsky, Suzanne

    2005-01-01

    A first of its kind in the state of Florida, the Seminole Community College's Center for Building Construction was constructed as a partnership project between Seminole Community College, industry persons and the state of Florida. A training facility for students in the Construction Trades Apprenticeship Program, the building stands on the SCC…

  11. Port Granby Project Overview - 13208

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, David W.; Vandergaast, Gary; Sungaila, Mark

    2013-07-01

    The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less

  12. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...

  13. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...

  14. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower shall use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract forms or written purchase order forms for...

  15. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower must use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract or written purchase order forms for those...

  16. 7 CFR 1726.125 - Generating plant facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... buildings are covered under subpart E of this part. (a) Contract forms. (1) The borrower shall use RUS Form... RUS Form 200, Construction Contract—Generating, for generating project construction contracts in the.... (3) The borrower may, in its discretion, use other contract forms or written purchase order forms for...

  17. 'Commitment' secures rooftop SSD contract.

    PubMed

    Davies, John

    2010-01-01

    John Davies, operations manager of multi-disciplinary mechanical and electrical and construction contractor cfes, describes a "turnkey" project that the company is undertaking for the Yeovil District Hospital (YDH) NHS Foundation Trust, involving both the design and construction of a new sterile services department, and substantial input into the facility's subsequent operation and management.

  18. Environmental Assessment for Proposed Construction Freight Transfer Facility, Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2007-06-01

    construction at the Fitzsimons Redevelopment area. As a result, there could be a negligible cumulative adverse impact on the ambient soundscape . The... soundscape in conjunction with other plans and projects. However, the attenuation of sound over distance and the phasing of development activity

  19. 75 FR 3221 - Ruby Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... effects of the construction and operation of the following project facilities: About 675.2 miles of 42... any of the following methods: Web site: http://www.blm.gov/nv/st/en/info/nepa/ruby_pipeline_project...

  20. 23 CFR 668.105 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... aid States in repairing road facilities which have suffered widespread serious damage resulting from a... feasible, the cost of permanent restoration work. (d) The approval to use available ER funds to repair or... over non-emergency work. (h) ER projects shall be promptly constructed. Any project that has not...

  1. 25 CFR 170.474 - Who conducts the project closeout?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who conducts the project closeout? 170.474 Section 170.474 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  2. 7 CFR 1709.123 - Evaluation criteria and weights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... design and technical merit criteria shall not be less than 65 percent of the total available points, and... announcement. (b) Project design and technical merit. In reviewing the grant proposal's project design and... the proposed design, construction, equipment and materials for the proposed energy facilities to...

  3. Projected Costs of U.S. Nuclear Forces, 2014 to 2023

    DTIC Science & Technology

    2013-12-01

    uranium and pluto- nium, and also includes several large construction projects for new facilities to support that mission); $12 billion is for...contributed to the analysis with guidance from Sarah Jennings. Justin Falk of CBO provided helpful comments on the report, as did Russell Rumbaugh

  4. Management self assessment plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debban, B.L.

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less

  5. 23 CFR 652.9 - Federal participation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...

  6. 23 CFR 652.9 - Federal participation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...

  7. 23 CFR 652.9 - Federal participation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...

  8. 23 CFR 652.9 - Federal participation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... primary importance for the development, protection, administration, and utilization of public lands and... facilities that would be interrupted by construction of the project, or to mitigate specific environmental...

  9. Capital Projects Manual for the Illinois Public Community Colleges.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    This manual is designed primarily for use by those persons at Illinois public community colleges who are responsible for planning and keeping records of college facilities. The Illinois Community College Board (ICCB) is mandated by law to approve the expenditure of state funds for purchase of sites and the construction of facilities and to…

  10. 41 CFR 102-74.140 - On what basis does the Administrator select construction and alteration projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Asset Services § 102-74.140 On what basis... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false On what basis does the...

  11. 30 CFR 585.650 - When may I begin conducting activities under my GAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... GAP? 585.650 Section 585.650 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... activities that do not involve a project easement or the construction of facilities on the OCS that BOEM has...

  12. 30 CFR 585.650 - When may I begin conducting activities under my GAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... GAP? 585.650 Section 585.650 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... activities that do not involve a project easement or the construction of facilities on the OCS that BOEM has...

  13. 30 CFR 585.650 - When may I begin conducting activities under my GAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... GAP? 585.650 Section 585.650 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... activities that do not involve a project easement or the construction of facilities on the OCS that BOEM has...

  14. Value Engineering. Technical Manual. School Facilities Development Procedures Manual.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    Value Engineering (VE) is a cost-optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. This technical manual provides guidance in developing the scope and applicability of VE to school projects; in…

  15. How to Tackle Tough Facility Design Considerations

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    This article is part of a series that has offered insight on planning a facilities project, hiring professionals, delivery system options and owner's responsibilities. In this article, the author focuses on some of the planning and design concepts one may be asked to consider in providing direction to his design and construction team. These…

  16. Building Systems on the Campus, Part I. BSIC/EFL Newsletter.

    ERIC Educational Resources Information Center

    BSIC/EFL Newsletter, 1972

    1972-01-01

    The major systems development projects of the 1960's were concerned primarily with facility problems at the elementary and secondary levels. Rapidly increasing enrollments coupled with changes in both curriculum and in teaching methods created a demand for more flexible facilities that could be constructed rapidly and inexpensively. The success of…

  17. Pinon Pine power project nears start-up

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tatar, G.A.; Gonzalez, M.; Mathur, G.K.

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing ofmore » the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.« less

  18. The "What," "Why" and "How" of Job Order Contracting (JOC). IssueTrak: A CEFPI Brief on Educational Facility Issues

    ERIC Educational Resources Information Center

    Jayne, Ken

    2004-01-01

    This "IssueTrak" discusses how facility planners and managers need an assortment of instruments in their toolbox so that they are able to select the best and most appropriate device for each project. A relatively new tool that should be at the disposal of all educational facility managers and planners is the construction delivery system of Job…

  19. KSC-2011-1398

    NASA Image and Video Library

    2011-02-08

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place inside the new 18,500-square-foot Electrical Maintenance Facility (EMF) at NASA's Kennedy Space Center in Florida. From left are Kennedy Director of Operations Mike Benik, NASA Construction of Facility Project Manager Nick Rivieccio and Kennedy Center Director Bob Cabana. Located in Kennedy's Launch Complex 39 area, the EMF will provide new and renovated space for maintenance shops, offices, and equipment and material storage in support of the electrical maintenance functions for the center. The facility is projected to receive Gold certification under the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) rating system. Photo credit: NASA/ Troy Cryder

  20. Crowder College MARET Center Facility Final Scientific/Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rand, Amy

    This project was a research facility construction project and did not include actual research. The new facility will benefit the public by providing training opportunities for students, as well as incubator and laboratory space for entrepreneurs in the areas of alternative and renewable energies. The 9,216 -square-foot Missouri Alternative and Renewable Energy Technology (MARET) Center was completed in late 2011. Classes in the MARET Center began in the spring 2012 semester. Crowder College takes pride in the MARET Center, a focal point of the campus, as the cutting edge in education, applied research and commercial development in the growing fieldmore » of green technology.« less

  1. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  2. An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project

    NASA Technical Reports Server (NTRS)

    Ryan, James E.

    2009-01-01

    An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.

  3. The SOAR Telescope Project Southern Observatory for Astronomical Research (SOAR)

    DTIC Science & Technology

    2003-03-21

    completed SOAR dome and facility. 2. Dome The preliminary design of the dome was handled by M3 (US). A Brazilian firm, Equatorial Sistemas led the...for the Gemini Telescope during construction, now Project Manager at the National Solar Observatory • Robert Shelton, Provost of the University on

  4. 23 CFR 774.15 - Constructive use determinations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... projected noise level increase attributable to the project substantially interferes with the use and enjoyment of a noise-sensitive facility of a property protected by Section 4(f), such as: (i) Hearing the... significance; (iv) Enjoyment of an urban park where serenity and quiet are significant attributes; or (v...

  5. 23 CFR 774.15 - Constructive use determinations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... projected noise level increase attributable to the project substantially interferes with the use and enjoyment of a noise-sensitive facility of a property protected by Section 4(f), such as: (i) Hearing the... significance; (iv) Enjoyment of an urban park where serenity and quiet are significant attributes; or (v...

  6. 23 CFR 774.15 - Constructive use determinations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... projected noise level increase attributable to the project substantially interferes with the use and enjoyment of a noise-sensitive facility of a property protected by Section 4(f), such as: (i) Hearing the... significance; (iv) Enjoyment of an urban park where serenity and quiet are significant attributes; or (v...

  7. 75 FR 18204 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    .... 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, Construction and Operation of a 3756-megawatt (MW) Concentrated Solar Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of- Way..., Contact: Louis Moore 916-978-5106. EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project...

  8. 25 CFR 170.423 - How are projects placed on the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are projects placed on the IRRTIP? 170.423 Section 170.423 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  9. Recommendations to Improve Space Projection Models and University Space Usage

    ERIC Educational Resources Information Center

    Stigall, Sam W.

    2007-01-01

    In today"s economy, public university administrators need to reflect on current practices for reporting and projecting space requirements to government entities as the cost of constructing new facilities or renovating space rises while income from legislative appropriations diminishes. As stewards of public buildings and funds, institutions…

  10. Performance related specifications for hydraulic cement concrete used in construction and rehabilitation of ground transportation facilities.

    DOT National Transportation Integrated Search

    1982-01-01

    This report summarizes the work performed on the subject study from June through September 1982. In accordance with the revised work plan for Task 4 of the project approved May 24, 1982, the new completion date for the project is April 30, 1983.

  11. Full-Scale Accelerated Testing of Multi-axial Geogrid Stabilized Flexible Pavements

    DTIC Science & Technology

    2017-06-01

    costs and reduced budgets, transportation officials are often tasked with applying innovative solutions to pavement design and construction projects... pavement designers . 1.2 Objective The objective of this effort was to construct and traffic full-scale flexible pavement sections to provide...Development Center (ERDC) constructed the full-scale test section as designed by Tensar under shelter in its Hangar 2 Pavement Test Facility. During

  12. Compendium of Administrators of Land Use and Related Programs. Revision

    DTIC Science & Technology

    1982-09-01

    construction engineering research laboratory Army Nation Unitad Stoic«» Army ^ n * Technical Report N-40 (Revised) September 19 82...CONTRACT OR GRANT NUMBER’«) \\ 9. PERFORMING ORGANIZATION NAME AND ADDRESS U.S. ARMY CONSTRUCTION ENGINEERING RESEARCH LABORATORY...Chief of Engineers (OCE), under Project 4A762720A896, "Environmental Quality for Construction and Operation of Military Facilities" Task 04. "Land Use

  13. Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Kevdzija, Susan L.

    2001-01-01

    Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.

  14. 77 FR 62525 - Notice of Availability of the Draft Supplemental Environmental Impact Statement and the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... application N-85801. The proposed solar energy project would consist of photovoltaic (PV) panels and related... Project and authorized ROW N-85077 for the construction and operation of a 50 MW PV solar energy facility... the Proposed Silver State Solar South Project in Clark County Near Primm, NV AGENCY: Bureau of Land...

  15. Department of the Navy Justification of Estimates for Fiscal Year 1983 Submitted to Congress February 1982. Research, Development, Test and Evaluation: Research, Development, Test and Evaluation, Navy.

    DTIC Science & Technology

    1982-02-01

    Improvements to and Construction of Government -Owned Facilities Funded by RDT&E -------------------- 57 Section 8: Project Data for Construction at... Government -Owned Facilities Funded by RDT&E --------------------------. . Section 9: Flight Simulator Programs...653,427 936.167 29 63202N AVIONICS 2 3,314 3,745 3,622 10,342 U 407 26 632n3N A0V HELICOPTER DEV 2 4,577 4,790 U 27 63207N ENVIRONENTAL APPLICATIONS 2

  16. Challenges in Construction Over Soft Soil - Case Studies in Malaysia

    NASA Astrophysics Data System (ADS)

    Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.

    2016-07-01

    Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

  17. 8. Photographic copy of construction drawing 1976 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Floor plan of entire building. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  18. Commissioning School Construction Projects. IssueTrak: A CEFPI Brief on Educational Facility Issues

    ERIC Educational Resources Information Center

    Keithly, Peter

    2005-01-01

    This "IssueTrak" discusses an increasing interest in verifying the installation and performance of building systems prior to delivery and final acceptance by the building owner. This interest in quality assurance has spawned a new and distinct professional construction discipline referred to as building commissioning. The principal objective of…

  19. Design Guide for Selection and Specification of Kevlar Rope for Ocean Engineering and Construction.

    DTIC Science & Technology

    1976-07-01

    public rtoieco cnd sol . It i Idim .buttm Is ul"rnimi.. OCEAN ENGINEERING AND CONSTRUCTION PROJECT OFFICE CHESAPEAKE DIVISION NAVAL FACILITIES ENGINEERING...be to have no more than one layer. This is impractical for oceano - graphic purposes. Assuming a need to spooi many layers of rope under tension

  20. 25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... contract payments; 7. Approving contract modifications; 8. Processing claims and disputes with tribal... assure compliance with or exceeding Federal standards for IRR design and construction. G. Construction: 1... inspection and acceptance of project documents as-built drawings on behalf of BIA as facility owner; and 11...

  1. Defending A+: how to maintain a high credit rating during a facilities overhaul.

    PubMed

    Ollie, Ed; Kolb-Collier, Deborah; Clay, Scott

    2007-11-01

    To defend its strong credit rating, New Hanover Regional Medical Center: Demonstrated a clear and cohesive vision. Improved short-term financial performance. Developed robust financial projections. Avoided reliance on a "build it and they will come" strategy. Managed construction cost risks. Minimized construction disruption. Anticipated financial market concerns and questions

  2. An assessment of potential CO2 Sources throughout the Illinois Basin Subtask 5.1 – CO2 Source Assessment Topical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patel, Vinodkumar; O?Brien, Kevin; Korose, Christopher

    Large-scale anthropogenic CO2 sources (>100,000 tonnes/year) were catalogued and assessed for the Illinois East Sub-Basin project area. The portfolio of sources is quite diverse, and contains not only fossil-based power generation facilities but also ethanol, chemical, and refinery facilities. Over 60% of the facilities are relatively new (i.e. post year 2000 construction) hence increasing the likelihood that retrofitting the facility with a carbon capture plant is feasible. Two of the facilities have indicated interest in being “early adopters” should the CarbonSAFE project eventually transition to a build and operate phase: the Prairie State Generating Company’s electricity generation facility near Marissa,more » Illinois, and Quasar Syngas, LLC’s Wabash ammonia/direct-reduced iron plant, currently in development north of Terre Haute, Indiana.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davlin, Thomas

    The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot printmore » and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.« less

  4. Timing Is Everything.

    ERIC Educational Resources Information Center

    Brunner, Patrick M.; Shelley, Kevin D.

    2001-01-01

    In school construction projects a great deal of work and planning needs to happen before ground breaking starts. Lists consistent factors that should always be considered when setting up a facility-design timeline. (MLF)

  5. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    NASA Astrophysics Data System (ADS)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  6. The South African isotope facility project

    NASA Astrophysics Data System (ADS)

    Bark, R. A.; Barnard, A. H.; Conradie, J. L.; de Villiers, J. G.; van Schalkwyk, P. A.

    2018-05-01

    The South African Isotope Facility (SAIF) is a project in which iThemba LABS plans to build a radioactive-ion beam (RIB) facility. The project is divided into the Accelerator Centre of Exotic Isotopes (ACE Isotopes) and the Accelerator Centre for Exotic Beams (ACE Beams). For ACE Isotopes, a high-current, 70 MeV cyclotron will be acquired to take radionuclide production off the existing Separated Sector Cyclotron (SSC). A freed up SSC will then be available for an increased tempo of nuclear physics research and to serve as a driver accelerator for the ACE Beams project, in which protons will be used for the direct fission of Uranium, producing beams of fission fragments. The ACE Beams project has begun with "LeRIB" - a Low Energy RIB facility, now under construction. In a collaboration with INFN Legnaro, the target/ion-source "front-end" will be a copy of the front-end developed for the SPES project. A variety of targets may be inserted into the SPES front-end; a uranium-carbide target has been designed to produce up to 2 × 1013 fission/s using a 70 MeV proton beam of 150 µA intensity.

  7. A Guide to Federal Financial Aid for Dental Health: Services, Facilities, Training, and Research.

    ERIC Educational Resources Information Center

    National Institutes of Health (DHEW), Bethesda, MD. Div. of Dental Health.

    Federal financial aid is available for a wide range of dental activities, including the provision of services, construction of facilities, education and training of professional and auxiliary personnel, and the conduct of research and demonstration projects. This publication contains a brief description of the purpose of each federal aid program,…

  8. Management of Legacy Spent Nuclear Fuel Wastes at the Chalk River Laboratories: The Challenges and Innovative Solutions Implemented - 13301

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schruder, Kristan; Goodwin, Derek

    2013-07-01

    AECL's Fuel Packaging and Storage (FPS) Project was initiated in 2004 to retrieve, transfer, and stabilize an identified inventory of degraded research reactor fuel that had been emplaced within in-ground 'Tile Hole' structures in Chalk River Laboratories' Waste Management Area in the 1950's and 60's. Ongoing monitoring of the legacy fuel storage conditions had identified that moisture present in the storage structures had contributed to corrosion of both the fuel and the storage containers. This prompted the initiation of the FPS Project which has as its objective to design, construct, and commission equipment and systems that would allow for themore » ongoing safe storage of this fuel until a final long-term management, or disposition, pathway was available. The FPS Project provides systems and technologies to retrieve and transfer the fuel from the Waste Management Area to a new facility that will repackage, dry, safely store and monitor the fuel for a period of 50 years. All equipment and the new storage facility are designed and constructed to meet the requirements for Class 1 Nuclear Facilities in Canada. (authors)« less

  9. Holifield Heavy-Ion Research Facility at Oak Ridge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, C.M.

    1977-01-01

    A new heavy-ion accelerator facility is now under construction at the Oak Ridge National Laboratory. A brief description of the scope and schedule of this project is given, and the new large tandem accelerator, which will be a major element of the facility is discussed in some detail. Several studies which have been made or are in progress in Oak Ridge in preparation for operation of the tandem accelerator are briefly described.

  10. Petropower energia project under way in Chile promises refiner better economics at lower cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-31

    Construction of the Republic of Chile`s first public/private industrial partnership project is well under way. Ground was broken for the $232-million Petropower Energia Limitada project early this year, shortly after the final contract between the parties - Foster Wheeler Power Systems, Inc. (FWPS); Petrox S.A. Refineria de Petroleo and Empresa Nacional del Petroleo (ENAP) - was signed. The Petropower project, located adjacent to Petrox`s 84,000-b/d refinery in Talcahuano, represents the first project ever to combine petroleum coking technology with cogeneration technology in a single project financing. Petropower is 85% owned by FWPS, 7.5% by ENAP, the Chilean national oil companymore » and parent of Petrox S.A. When completed in mid-1998, the Petropower project will enable Petrox to refine heavier crudes and enhance the refinery`s flexibility and economics. The project will consist of a delayed coking facility (a 12,000-b/d delayed coking unit and a 7,000-b/d hydrotreating plant) and a 67-MW (59 MW net) cogeneration plant. The coke produced will fuel a Foster Wheeler proprietary-design circulating fluidized-bed (CFB) boiler which will generate all the high-pressure steam and electric power needs of the Petrox refinery. This unit will be the first circulating fluidized-bed boiler to be built in Latin America. The cogeneration facility, using limestone as a reagent and equipped with a baghouse, will control SO{sub x} emissions from combustion of the green coke fuel and easily meet all Chilean environmental standards. Moreover, by constructing the cogeneration facility, Petrox will not have to proceed with capital improvements to existing facilities to ensure a reliable source of steam and electricity, resulting in substantial savings for Petrox. The cogeneration plant provides a permanent {open_quotes}disposal{close_quotes} for all coke produced by the delayed coker, thereby solving any future problems of unwanted or excess coke.« less

  11. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    PubMed

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  12. 7 CFR 4280.149 - Requirements after project construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sanitation problem has been solved. (3) The annual income and/or energy savings of the renewable energy... maintenance or operational problems associated with the facility. (6) Recommendations for development of...

  13. 75 FR 5873 - Environmental Assessment or Environmental Impact Statement for Purchase of Renewable Energy From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... meters in rotor diameter. In addition to the wind turbines, the proposed Project will involve... of Renewable Energy From CPV Ashley Wind Power Project in North Dakota AGENCY: Tennessee Valley... this renewable energy, CPV is proposing to construct and operate a wind-powered generating facility in...

  14. 77 FR 62507 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... Market Expansion Project 2014 and Request for Comments on Environmental Issues The staff of the Federal... discuss the environmental impacts of the Texas Eastern and Appalachia Market Expansion Project 2014 (TEAM 2014) involving construction and operation, modification and abandonment of facilities proposed by...

  15. Avoiding Preconceptions in School Construction

    ERIC Educational Resources Information Center

    Maletz, Andrew

    2012-01-01

    An existing facility that is being upgraded or retrofitted today typically is 30 to 45 years old, often with limited natural light, antiquated mechanical systems and retrofitted technology. All too often at the outset of a project, the broader project goals--and even those narrower in scope--seem daunting or altogether impossible when staring at a…

  16. 78 FR 3911 - Notice of Intent To Prepare an Environmental Impact Statement and Possible Amendment to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... propose to construct gas processing facilities in the project area to separate natural gas liquids from... natural gas liquids to market pipelines located near Wamsutter, Wyoming (approximately 100 miles south of... Environmental Impact Statement (EIS) for the proposed Moneta Divide Natural Gas and Oil Development Project...

  17. VA Construction: Improved Processes Needed to Monitor Contract Modifications, Develop Schedules, and Estimate Costs

    DTIC Science & Technology

    2017-03-01

    address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less

  20. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  1. Telescopio San Pedro Mártir Observatory preliminary design and project approach

    NASA Astrophysics Data System (ADS)

    Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina

    2016-07-01

    The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.

  2. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival ofmore » migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.« less

  3. Virtual Walk: The Construction of the Long Baseline Neutrino Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This 2-minute animation shows a virtual walk through the large caverns of the Long-Baseline Neutrino Facility, which will house the Deep Underground Neutrino Experiment. To create the caverns for the huge DUNE particle detectors, construction crews will excavate more than 800,000 tons of rock a mile underground at the Sanford Underground Research Facility in South Dakota. Scientists and dignitaries broke ground for this project on July 21, 2017. When construction is complete, DUNE scientists will send an intense neutrino beam through 1,300 kilometers of rock from the Department of Energy’s Fermilab to the DUNE particle detectors to understand the rolemore » that neutrinos – the most abundant matter particles in the universe – play in our cosmos. About 1,000 scientists from more than 160 institutions in 30 countries work on the Deep Underground Neutrino Experiment.« less

  4. Status of the FLARE (Facility for Laboratory Reconnection Experiments) Construction Project and Plans as a User Facility

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.

    2016-10-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.

  5. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  6. Energy Systems Integration Newsletter | Energy Systems Integration Facility

    Science.gov Websites

    simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated

  7. 76 FR 28029 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... 210- 424-8346. EIS No. 20110143, Final EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar Thermal Facility on Public Lands, Approval for Right-of-Way Grant...

  8. 75 FR 55326 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ..., Contact: Kimberly Kler 360- 396-0927. EIS No. 20100365, Final EIS, BLM, NV, Silver State Solar Energy Project, Construction and Operation of a 400-megawatt Photovoltaic Solar Plant and Associated Facilities...

  9. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  11. Satellite remote sensing facility for oceanograhic applications

    NASA Technical Reports Server (NTRS)

    Evans, R. H.; Kent, S. S.; Seidman, J. B.

    1980-01-01

    The project organization, design process, and construction of a Remote Sensing Facility at Scripps Institution of Oceanography at LaJolla, California are described. The facility is capable of receiving, processing, and displaying oceanographic data received from satellites. Data are primarily imaging data representing the multispectral ocean emissions and reflectances, and are accumulated during 8 to 10 minute satellite passes over the California coast. The most important feature of the facility is the reception and processing of satellite data in real time, allowing investigators to direct ships to areas of interest for on-site verifications and experiments.

  12. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  13. Space Nuclear Thermal Propulsion (SNTP) Air Force facility

    NASA Technical Reports Server (NTRS)

    Beck, David F.

    1993-01-01

    The Space Nuclear Thermal Propulsion (SNTP) Program is an initiative within the US Air Force to acquire and validate advanced technologies that could be used to sustain superior capabilities in the area or space nuclear propulsion. The SNTP Program has a specific objective of demonstrating the feasibility of the particle bed reactor (PBR) concept. The term PIPET refers to a project within the SNTP Program responsible for the design, development, construction, and operation of a test reactor facility, including all support systems, that is intended to resolve program technology issues and test goals. A nuclear test facility has been designed that meets SNTP Facility requirements. The design approach taken to meet SNTP requirements has resulted in a nuclear test facility that should encompass a wide range of nuclear thermal propulsion (NTP) test requirements that may be generated within other programs. The SNTP PIPET project is actively working with DOE and NASA to assess this possibility.

  14. Win(d)-Win(d) Solutions for wind developers and bats

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hein, Cris; Schirmacher, Michael; Arnett, Ed

    Bat Conservation International initiated a multi-year, pre-construction study in mid-summer 2009 to investigate patterns of bat activity and evaluate the use of acoustic monitoring to predict mortality of bats at the proposed Resolute Wind Energy Project (RWEP) in east-central Wyoming. The primary objectives of this study were to: (1) determine levels and patterns of activity for three phonic groups of bats (high-frequency emitting bats, low-frequency emitting bats, and hoary bats) using the proposed wind facility prior to construction of turbines; (2) determine if bat activity can be predicted based on weather patterns; correlate bat activity with weather variables; and (3)more » combine results from this study with those from similar efforts to determine if indices of pre-construction bat activity can be used to predict post-construction bat fatalities at proposed wind facilities. We report results from two years of pre-construction data collection.« less

  15. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project ismore » now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw, labor un ions, and the local community in creating and executing a successful project.« less

  16. The radioactive ion beams facility project for the legnaro laboratories

    NASA Astrophysics Data System (ADS)

    Tecchio, Luigi B.

    1999-04-01

    In the frame work of the Italian participation to the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involving in the design and construction of prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has been already financially supported and the work is actually in progress. In this context, the LNL has been proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by using the ISOL method. The final goal consists in the production of neutron rich RIBs with masses ranging from 80 to 160 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is proposed to be developed in about 10 years from now and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999-2003). In such period of time is proposed the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production, to the BNCT applications and to the neutron physics. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed.

  17. One-Step and Two-Step Facility Acquisition for Military Construction: Project Selection and Implementation Procedures

    DTIC Science & Technology

    1990-08-01

    the guidance in this report. 1-4. Scope This guidance covers selection of projects suitable for a One-Step or Two-Step approach, development of design...conducted, focus on resolving proposal deficiencies; prices are not "negotiated" in the common use of the term. A Request for Proposal (RFP) states project ...carefully examines experience and past performance in the design of similar projects and building types. Quality of

  18. ISABELLE: a progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hahn, H

    This paper discusses the ISABELLE project, which has the objective of constructing a high-energy proton colliding beam facility at Brookhaven National Laboratory. The major technical features of the intersecting storage accelerators with their projected performance are described. Application of over 1000 superconducting magnets in the two rings represents the salient characteristic of the machine. The status of the entire project, the technical progress made so far, and difficulties encountered are reviewed.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smyth, John

    The Rainier Biogas project is a community manure processing and renewable energy generation facility. Construction was completed and operation initiated in 2012. It is owned and operated by Rainier Biogas, LLC in collaboration with local dairy farmers, Washington State University, and the King County Department of Natural Resources and Parks. The project receives manure from three to four partner dairy farms mostly by underground pipe. The project is located at 43218 208th Ave SE; Enumclaw, WA 98022.

  20. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  1. 40 CFR 93.101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), 182(c)(2)(B), 187(a)(7), 187(g), 189(a)(1)(B), 189(b)(1)(A), and 189(d); sections 192(a) and 192(b... further progress or attainment). Design concept means the type of facility identified by the project, e.g... capacity and control, e.g., number of lanes or tracks to be constructed or added, length of project...

  2. 40 CFR 93.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), 182(c)(2)(B), 187(a)(7), 187(g), 189(a)(1)(B), 189(b)(1)(A), and 189(d); sections 192(a) and 192(b... further progress or attainment). Design concept means the type of facility identified by the project, e.g... capacity and control, e.g., number of lanes or tracks to be constructed or added, length of project...

  3. Patchogue River, Westbrook, Connecticut. Small Navigation Project, Detailed Project Report and Environmental Assessment.

    DTIC Science & Technology

    1982-12-01

    Westbrook, especially if channel modifications are undertaken. Currently, local entrepreneurs are planning to construct new power- boat facilities...result. Value of Delay Time Existing S14,400 W/Plan B 7,200 PLAN B: Annual Benefit = S 7,200 PLAN C Plan C would increse the width of the existing channel

  4. 78 FR 34089 - Jordan Cove Energy Project, L.P.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Docket No. CP13-483-000 an application under section 3 of the Natural Gas Act (NGA) and Parts 153 and 380 of the Commission's regulations, seeking authorization to site, construct and operate a natural gas liquefaction and liquefied natural gas (LNG) export facility (Liquefaction Project) on the bay side of the...

  5. 75 FR 60093 - Record of Decision for the United States Marine Corps Basewide Utilities Infrastructure Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... construction, operation, and maintenance of utility infrastructure upgrades, expansions, and improvements... and wastewater facilities and road improvements to Range 130. All practical means to avoid or minimize...

  6. Development of a utility conflict management system.

    DOT National Transportation Integrated Search

    2009-02-01

    A critical process for the timely development and delivery of highway construction projects is the early : identification and depiction of utility interests that may interfere with proposed highway facilities. The : effective management of such utili...

  7. Tunnel operations study.

    DOT National Transportation Integrated Search

    2013-12-01

    In June 2000, the State of Alaska Department of Transportation and Public Facilities completed construction of the Whittier Access Project by converting the existing 2.5- : mile Whittier Tunnel into the worlds only dual-use highway/rail tunnel wit...

  8. 7. Photographic copy of construction drawing 1976 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations of entire building exterior. Includes elevation, plan and details of the addition's interior stairs. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  9. 77 FR 16547 - Radionuclide National Emission Standards for Hazardous Air Pollutants; Notice of Construction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Creek In-Situ Recovery Project. The holding ponds at the Lost Creek facility are subject to 40 CFR part... in 2011 by EPA Region 8 for the construction or modification of sources subject to the Radionuclide... Provisions to the Radionuclide NESHAP in 40 CFR part 61, subpart A, require a source owner or operator to...

  10. Recent health sciences library building projects.

    PubMed Central

    Ludwig, L

    1993-01-01

    The Medical Library Association's third annual survey of recent health sciences library building projects identified fourteen libraries planning, expanding, or constructing new library facilities. Three of five new library buildings are freestanding structures where the library occupies all or a major portion of the space. The two other new facilities are for separately administered units where the library is a major tenant. Nine projects involve additions to or renovations of existing space. Six projects are in projected, predesign, or design stages or are awaiting funding approval. This paper describes four projects that illustrate technology's growing effect on librarians and libraries. They are designed to accommodate change, a plethora of electronic gear, and easy use of technology. Outwardly, they do not look much different than many other modern buildings. But, inside, the changes have been dramatic although they have evolved slowly as the building structure has been adapted to new conditions. Images PMID:8251970

  11. Improving Management of Military Construction Planning and Design

    DTIC Science & Technology

    1991-10-01

    waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing

  12. Facility shows benefit of staying single.

    PubMed

    Baillie, Jonathan

    2010-08-01

    Construction of the new 513-bed PFI-funded hospital in Pembury near Tunbridge Wells in Kent, a pound 227 million acute healthcare facility that, on its completion in the autumn of 2011, will be the UK's first to offer 100% single-bed en suite accommodation, is ahead of schedule, "thanks to excellent teamwork and careful planning". During a visit to the now rapidly emerging healthcare facility, located in an Area of Outstanding Natural Beauty (AONB) in a wooded hillside location in the Weald of Kent which Nigel Keen, general manager for the PFI project company, described as "the most attractive site for a hospital I have ever worked on", HEJ editor Jonathan Baillie met key project personnel and discussed the impressive progress made to date.

  13. Low emittance lattice for the storage ring of the Turkish Light Source Facility TURKAY

    NASA Astrophysics Data System (ADS)

    Nergiz, Z.; Aksoy, A.

    2015-06-01

    The TAC (Turkish Accelerator Center) project aims to build an accelerator center in Turkey. The first stage of the project is to construct an Infra-Red Free Electron Laser (IR-FEL) facility. The second stage is to build a synchrotron radiation facility named TURKAY, which is a third generation synchrotron radiation light source that aims to achieve a high brilliance photon beam from a low emittance electron beam at 3 GeV. The electron beam parameters are highly dependent on the magnetic lattice of the storage ring. In this paper a low emittance storage ring for TURKAY is proposed and the beam dynamic properties of the magnetic lattice are investigated. Supported by Turkish Republic Ministry of Development (DPT2006K120470)

  14. Planning for progress, productivity, and performance.

    PubMed

    Benedict, J M

    1983-10-01

    A project is described for the interim renovation of a labor intensive existing foodservice facility. The renovated area will provide effective food management during the hospital's redevelopment period, including a new foodservice. Objectives of the interim project were to conserve labor while emphasizing control and centralization, provide economic foodservices with improved quality, and incorporate one tray distribution system throughout the hospital complex. Immediate measures were necessary in order to generate funds to proceed. Renovations had to occur without disrupting food-service to patients. The project was planned over a three year period and included an ingredient control area, two patient tray service centres, a renewed production kitchen and test kitchen facility. Each phase has been financed on the understanding that the costs of construction and equipment will be repaid within one fiscal year of operating the renovated facility. Positive results are being achieved, attributable to the support and encouragement received from staff during the change process.

  15. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less

  17. Evaluation of aggregate sections at Mn/ROAD

    DOT National Transportation Integrated Search

    2000-06-01

    This project focuses on the second construction phase of the Minnesota Road Research facility (Mn/ROAD) and evaluates three typical, locally available, surfacing aggregates along with a rollover section from the initial phase for performance. The pro...

  18. Nuclear power-related facilities and neighboring land price: a case study on the Mutsu-Ogawara region, Japan.

    PubMed

    Yamane, Fumihiro; Ohgaki, Hideaki; Asano, Kota

    2011-12-01

    From the perspective of risk, nuclear-power-related facilities (NPRFs) are often regarded as locally undesirable land use. However, construction of NPRFs contributes to social infrastructural improvement and job creation in the host communities. This raises a question: How large are these positive and negative effects? To approach this question from an economic viewpoint, we estimated the hedonic land price function for the Mutsu-Ogawara region of Japan from 1976 to 2004 and analyzed year-by-year fluctuations in land prices around the NPRFs located there. Land prices increased gradually in the neighborhood of the nuclear fuel cycle facilities (NFCFs) in Rokkasho Village, except for some falling (i) from 1982 to 1983 (the first official announcement of the project of construction came in 1983), (ii) from 1987 to 1988 (in 1988, the construction began and opposition movements against the project reached their peak), and (iii) from 1998 to 1999 (the pilot carry-in of spent fuels into the reprocessing plant began in 1998). Land prices around the Higashidori Nuclear Power Plant decreased during the period 1981-1982, when the Tohoku Electric Power Corp. and Tokyo Electric Power Corp. announced their joint construction plan. On the other hand, we obtained some results, even though not significant, indicating that land prices around Ohminato and Sekinehama harbors changed with the arrival and departure of the nuclear ship Mutsu, which suffered a radiation leak in 1974. © 2011 Society for Risk Analysis.

  19. Congressional hearing reviews NSF major research and facilities projects

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  20. Safety Evaluation Report: Development of Improved Composite Pressure Vessels for Hydrogen Storage, Lincoln Composites, Lincoln, NE, May 25, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fort, III, William C.; Kallman, Richard A.; Maes, Miguel

    2010-12-22

    Lincoln Composites operates a facility for designing, testing, and manufacturing composite pressure vessels. Lincoln Composites also has a U.S. Department of Energy (DOE)-funded project to develop composite tanks for high-pressure hydrogen storage. The initial stage of this project involves testing the permeation of high-pressure hydrogen through polymer liners. The company recently moved and is constructing a dedicated research/testing laboratory at their new location. In the meantime, permeation tests are being performed in a corner of a large manufacturing facility. The safety review team visited the Lincoln Composites site on May 25, 2010. The project team presented an overview of themore » company and project and took the safety review team on a tour of the facility. The safety review team saw the entire process of winding a carbon fiber/resin tank on a liner, installing the boss and valves, and curing and painting the tank. The review team also saw the new laboratory that is being built for the DOE project and the temporary arrangement for the hydrogen permeation tests.« less

  1. LANL robotics site overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beugelsdijk, T.J.

    1990-11-01

    This paper reports on robotics applications at the Los Alamos National Laboratory. The topics of the paper include the ROBOCAL project to assay all nuclear materials entering and leaving the process floor at the Los Alamos Plutonium Facility, the isotope detector fabrication project, a plutonium dissolution robotic system, a safeguards waste automated measurement instrument, and DNA filter array construction. This report consists of overheads only.

  2. BLDG. 2 - PROJECT MANAGEMENT - PROGRESS PHOTO - CLEAR LAKE - MSC

    NASA Image and Video Library

    1963-05-21

    S63-06371 (1963) --- Construction continues on the Project Management facility, Building 2, at the Manned Spacecraft Center, some 25 miles southeast of the central business district of Houston, TX. The building's numerical designation was changed to Building 1 on June 28, 1974, and the center's name became the Johnson Space Center on Feb. 19, 1973. Photo credit: NASA

  3. New radiation protection calibration facility at CERN.

    PubMed

    Brugger, Markus; Carbonez, Pierre; Pozzi, Fabio; Silari, Marco; Vincke, Helmut

    2014-10-01

    The CERN radiation protection group has designed a new state-of-the-art calibration laboratory to replace the present facility, which is >20 y old. The new laboratory, presently under construction, will be equipped with neutron and gamma sources, as well as an X-ray generator and a beta irradiator. The present work describes the project to design the facility, including the facility placement criteria, the 'point-zero' measurements and the shielding study performed via FLUKA Monte Carlo simulations. © The Author 2013. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  4. The Healy clean coal project: An overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olson, J.B.; McCrohan, D.V.

    1997-12-31

    The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plantmore » are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.« less

  5. Research on the application of PPP model in the Chinese construction and operation of new energy vehicle charging facilities

    NASA Astrophysics Data System (ADS)

    Zhu, Liping

    2017-05-01

    New energy car charging equipment is the development and popularization of new energy vehicles. It has the nature of quasi-public goods. Due to the large number of construction projects, wide distribution, big investment, it needs huge sums of money. PPP mode is a new financing model and has the inherent driving force to lead the idea the technology and the system innovation. The government and the social subject cooperate on the basis of the spirit of contract thus achieve benefit sharing. This mode effectively improve the operation of new energy vehicle charging facilities operating efficiency

  6. Protecting public interests in public-private-partnership arrangements for highway improvement projects.

    DOT National Transportation Integrated Search

    2012-03-16

    Engaging private investors and entrepreneurs through public-private partnership (PPP) in : constructing and operating transportation facilities has emerged as one of the viable options to : meet the challenges of funding the development and maintenan...

  7. Solar heating system for recreation building at Scattergood School

    NASA Technical Reports Server (NTRS)

    Heins, C. F.

    1978-01-01

    The solar heating facility and the project involved in its construction are described. As such, it has both detailed drawings of the completed system and a section that discusses the bottlenecks that were encountered along the way.

  8. 42 CFR 136.104 - Application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...

  9. 42 CFR 136.104 - Application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...

  10. 42 CFR 136.104 - Application.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of Facilities... which the proposed project is compatible with published Indian Health Service statements of availability...

  11. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  12. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEDESCHI AR

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technologymore » summary, reported in RPP-RPT-37740.« less

  13. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    NASA Astrophysics Data System (ADS)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  14. Impact of community engagement on public acceptance towards waste-to-energy incineration projects: Empirical evidence from China.

    PubMed

    Liu, Yong; Sun, Chenjunyan; Xia, Bo; Cui, Caiyun; Coffey, Vaughan

    2018-06-01

    As one of the most popular methods for the treatment of municipal solid waste (MSW), waste-to-energy (WTE) incineration offers effective solutions to deal with the MSW surge and globe energy issues. Nevertheless, the construction of WTE facilities faces considerable and strong opposition from local communities due to the perceived potential risks. The present study aims to understand whether, and how, community engagement improves local residents' public acceptance towards waste-to-energy (WTE) incineration facilities using a questionnaire survey conducted with nearby residents of two selected WTE incineration plants located in Zhejiang province, China. The results of data analysis using Structural Equation Modeling (SEM) reveal that firstly, a lower level of public acceptance exists among local residents of over the age of 35, of lower education levels, living within 3 km from the WTE Plant and from WTE incineration Plants which are under construction. Secondly, the public trust of local government and other authorities was positively associated with the public acceptance of the WTE incineration project, both directly and indirectly based on perceived risk. Thirdly, community engagement can effectively enhance public trust in local government and other authorities related to the WTE incineration project. The findings contribute to the literature on MSW treatment policy-making and potentially hazardous facility siting, by exploring the determinants of public acceptance towards WTE incineration projects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Final Environmental Assessment Addressing a Proposed Airfield Drainage Improvement Project, Dobbins Air Reserve Base, Georgia

    DTIC Science & Technology

    2013-11-01

    Construction ofNew gynmasium with basketball/volleyball comt and spectator Fitness Center seating area, racquetball comts , and a resistance and free...Martin Aeronautics Material Recycling Facility: Option 1, Facility Layout. 3 August 2011. Deprutment of Defense (DOD). 2010. Memorandum from Dorothy...Selected Airport Noise Analysis Issues. August 1992. Harvard University. 2010. "Diversity Data- Atlanta-Sandy Sptings-Matietta, GA." Available online

  16. Development of a Knowledge-Based System Approach for Decision Making in Construction Projects

    DTIC Science & Technology

    1992-05-01

    a generic model for an administrative facility and medical facility with predefined fixed building systems based on Air Force criteria and past...MAINTENANCE HANGAR (MEDIUM BAY) CORROSION CONTROL HANGAR (HIGH BAY) FUEL SYSTEM MAINTENANCE HANGAR (MEDIUM BAY) MEDICAL MODEL 82 Table 5-1--continued...BUILDING SUPPORT MEDICAL LOGISTICS MEDICAL TOTAL 85 Table 5-2--continued MISSILE ASSEMBLY AND MAINTENANCE BUILDING TOTAL MISSILE LOADING AND UNLOADING

  17. Project Nuclotron-based Ion Collider fAcility at JINR

    NASA Astrophysics Data System (ADS)

    Kekelidze, V. D.; Matveev, V. A.; Meshkov, I. N.; Sorin, A. S.; Trubnikov, G. V.

    2017-09-01

    The project of Nuclotron-based Ion Collider fAcility (NICA) that is under development at JINR (Dubna) is presented. The general goals of the project are experimental studies of both hot and dense baryonic matter and spin physics (in collisions of polarized protons and deuterons). The first program requires providing of heavy ion collisions in the energy range of √ {{s_{NN}}} = 4-11 Gev at average luminosity of L = 1 × 1027 cm-2 s-1 for 197Au79+ nuclei. The polarized beams mode is proposed to be used in energy range of √ {{s_{NN}}} = 12-27 Gev (protons at luminosity of L ≥ 1 × 1030 cm-2 s-1. The report contains description of the facility scheme and its characteristics in heavy ion operation mode. The Collider will be equipped with two detectors—MultiPurpose Detector (MPD), which is in an active stage of construction, and Spin Physics Detector (SPD) that is in the stage of conceptual design. Fixed target experiment "Baryonic matter at Nuclotron" (BM@N) will be performed in very beginning of the project. The wide program of applied researches at NICA facility is being developed as well.

  18. Los Alamos Canyon Ice Rink Parking Flood Plain Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hathcock, Charles Dean; Keller, David Charles

    2015-02-10

    The project location is in Los Alamos Canyon east of the ice rink facility at the intersection of West and Omega roads (Figure 1). Forty eight parking spaces will be constructed on the north and south side of Omega Road, and a lighted walking path will be constructed to the ice rink. Some trees will be removed during this action. A guardrail of approximately 400 feet will be constructed along the north side of West Road to prevent unsafe parking in that area.

  19. Construction of a high-tech operating room for image-guided surgery using VR.

    PubMed

    Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Otake, Yoshito; Hayashibe, Mitsuhiro; Kobayashi, Susumu; Nezu, Takehiko; Sakai, Haruo; Umezawa, Yuji

    2005-01-01

    This project aimed to construct an operating room to implement high dimensional (3D, 4D) medical imaging and medical virtual reality techniques that would enable clinical tests for new surgical procedures. We designed and constructed such an operating room at Dai-san Hospital, the Jikei Univ. School of Medicine, Tokyo, Japan. The room was equipped with various facilities for image-guided, robot and tele- surgery. In this report, we describe an outline of our "high-tech operating room" and future plans.

  20. Environmental Assessment: Construction of Air Traffic Control Tower Tinker Air Force Base, Oklahoma

    DTIC Science & Technology

    2009-03-01

    including the A-7D Corsair , the E-3A Airborne Warning and Control (AWAC) aircraft, the E-4 Airborne Command Post aircraft, and air- and ground-launched...Transformation (DMRT) Three- Bay Hangar Construction; • Construct Consolidated Fuel and Overhaul Facility; • Military Family Housing Privatization...vicinity of Tinker AFB for the next five years are included in Table 5-1. Table 5-1 Projects Occurring at or near Tinker AFB. DMRT Three Bay Hangar

  1. The Lesotho Hospital PPP experience: catalyst for integrated service delivery.

    PubMed

    Coelho, Carla Faustino; O'Farrell, Catherine Commander

    2011-01-01

    For many years, Lesotho urgently needed to replace its main public hospital, Queen Elizabeth II. The project was initially conceived as a single replacement hospital, but eventually included the design and construction of a new 425 bed public hospital and adjacent primary care clinic, the renovation and expansion of three strategically located primary care clinics in the region and the management of all facilities, equipment and delivery of all clinical services in the health network by a private operator under contract for 18 years. The project's design was influenced by the recognition that a new facility alone would not address the underlying issues in service provision. The creation of this PPP health network and the contracting mechanism has increased accountability for service quality, shifted Government to a more strategic role and may also benefit other public facilities and providers in Lesotho. The county is considering the PPP approach for other health facilities.

  2. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gasmore » emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  3. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less

  4. Environmental Assessment for East Housing Area Solar Energy Project, Vandenberg Air Force Base, California

    DTIC Science & Technology

    2014-07-01

    would meet the Project’s purpose and need. The Proposed Action hereinafter “Project” includes leasing land to and entering into a Power Purchase...Agreement (PPA) with a private developer who would design, construct, operate and maintain an unmanned photovoltaic (PV) solar energy facility at the...infrastructure (e.g., roads, power lines, water). The Project is projected to provide almost 25 percent of VAFB’s electrical energy and is not

  5. KSC-2009-6449

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is unveiled at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  6. KSC-2009-6457

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is ready for operation at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  7. KSC-2009-6450

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility opens at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  8. Texas transportation planning for future renewable energy projects : final report.

    DOT National Transportation Integrated Search

    2017-03-01

    There will be a significant increase in the number of renewable energy production facilities in Texas. The : construction of wind farms requires the transport of wind turbine components that create increased loads on : rural roads and bridges. These ...

  9. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Preclosure Guidelines Environment, Socioeconomics, and Transportation § 960.5-2-5 Environmental... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts... of the repository or its support facilities on, a component of the National Park System, the National...

  10. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dahl, Suzanne; Biyani, Rabindra; Holmes, Erika

    The United States Department of Energy's (US DOE's) Hanford Nuclear Site has 177 underground waste storage tanks located 19 to 24 km (12 to 15 miles) from the Columbia River in south-central Washington State. Hanford's tanks now hold about 212,000 cu m (56 million gallons) of highly radioactive and chemically hazardous waste. Sixty-seven tanks have leaked an estimated 3,785 cu m (1 million gallons) of this waste into the surrounding soil. Further releases to soil, groundwater, and the Columbia River are the inevitable result of the tanks continuing to age. The risk from this waste is recognized as a threatmore » to the Northwest by both State and Federal governments. US DOE and Bechtel National, Inc., are building the Waste Treatment and Immobilization Plant (WTP) to treat and vitrify (immobilize in glass) the waste from Hanford's tanks. As is usual for any groundbreaking project, problems have arisen that must be resolved as they occur if treatment is to take place as specified in the court-enforceable Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) and the Consent Decree, entered into by US DOE, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology (Ecology). At times, US DOE's approach to solving these critical issues seems to have caused undue wastes of time, energy, and, ultimately, public funds. Upon reviewing the history of Hanford's tank waste treatment project, Ecology hopes that constructive criticism of past failures and praise of successes will inspire US DOE to consider changing practices, be more transparent with regulatory agencies and the public, and take a 'lean production' approach to successfully completing this project. All three Tri-Party Agreement agencies share the goal of completing WTP on time, ensuring it is operational and in compliance with safety standards. To do this, Ecology believes US DOE should: - Maintain focus on the primary goal of completing the five major facilities of WTP. - Construct a supplemental low-activity waste (LAW) vitrification facility for the two-thirds balance of LAW that will not be treated by the vitrification facility under construction. - Prepare infrastructure for waste feed from the tanks and facilities to handle the WTP waste streams. To support this project track, Ecology expedites dangerous waste permitting by using a design-build approach to integrate WTP into the Resource Conservation and Recovery Act permit for Hanford. (authors)« less

  12. Tongonani geothermal power development, Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minson, A.A.C.; Fry, T.J.; Kivell, J.A.

    1985-01-01

    This paper describes the features, design and construction of a 112 MWe geothermal power project, representing the first stage development of the substantial geothermal resources of the central Philippine region. The project has been undertaken by the Philippine Government. The National Powe Corporation is responsible for generation and distribution facilities and the Philippine National Oil Company Energy Development Corporation is responsible for controlled delivery of steam to the powe station.

  13. Histopathology slide projector: a simple improvisation.

    PubMed

    Agarwal, Akhilesh K R; Bhattacharya, Nirjhar

    2008-07-01

    The ability to examine histopathology and other hematological slides under microscope is a necessary and important service which should be available in every health facility. The slides need to be projected on to a screen. We describe an inexpensive and easily constructed technique for projecting magnified images of slides using a simple microscope. It is effective both for making observations and for use as a teaching aid.

  14. 77 FR 35423 - Notice of Availability of the Record of Decision for the Ocotillo Express LLC's Ocotillo Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... as originally proposed would have consisted of 155 wind turbines (1.6 to 3.0 MW each) on 12,436 acres... the Refined Project, which involves the construction and operation of 112 wind turbines at the project... of the wind generation facility consisting of: up to 112 turbines with a generating capacity of 315...

  15. Development of a Tandem-Electrostatic-Quadrupole facility for Accelerator-Based Boron Neutron Capture Therapy.

    PubMed

    Kreiner, A J; Castell, W; Di Paolo, H; Baldo, M; Bergueiro, J; Burlon, A A; Cartelli, D; Vento, V Thatar; Kesque, J M; Erhardt, J; Ilardo, J C; Valda, A A; Debray, M E; Somacal, H R; Sandin, J C Suarez; Igarzabal, M; Huck, H; Estrada, L; Repetto, M; Obligado, M; Padulo, J; Minsky, D M; Herrera, M; Gonzalez, S J; Capoulat, M E

    2011-12-01

    We describe the present status of an ongoing project to develop a Tandem-ElectroStatic-Quadrupole (TESQ) accelerator facility for Accelerator-Based (AB)-BNCT. The project final goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the (7)Li(p,n)(7)Be reaction. The machine currently being constructed is a folded TESQ with a high-voltage terminal at 0.6 MV. We report here on the progress achieved in a number of different areas. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. Reliability of mobile systems in construction

    NASA Astrophysics Data System (ADS)

    Narezhnaya, Tamara; Prykina, Larisa

    2017-10-01

    The purpose of the article is to analyze the influence of the mobility of construction production in the article taking into account the properties of reliability and readiness. Basing on the studied systems the effectiveness and efficiency is estimated. The construction system is considered to be the complete organizational structure providing creation or updating of construction facilities. At the same time the production sphere of these systems joins the production on the building site itself, material and technical resources of the construction production and live labour in these spheres within the construction dynamics. The author concludes, that the estimation of the degree of mobility of systems the of construction production makes a great positive effect in the project.

  17. The Atacama Large Aperture Submm/mm Telescope (AtLAST) Project

    NASA Astrophysics Data System (ADS)

    Bertoldi, Frank

    2018-01-01

    In the past decade a strong case has been made for the construction of a next generation, 25 to 40-meter large submillimeter telescope, most notably through the CCAT and the Japanese LST projects. Although much effort had been spent on detailed science cases and technological studies, none of these projects have yet secured funding to advance to construction. We invite the interested community to join a study of the scientific merit, technical implementation, and financial path toward what we coin the "Atacama Large Submillimeter Telescope" (AtLAST). Through this community workshop, working groups, and a final report to be released in early 2019, we hope to motivate the global astronomy community to value and support the realization of such a facility.

  18. Health sciences library building projects: 1994 survey.

    PubMed Central

    Ludwig, L

    1995-01-01

    Designing and building new or renovated space is time consuming and requires politically sensitive discussions concerning a number of both long-term and immediate planning issues. The Medical Library Association's fourth annual survey of library building projects identified ten health sciences libraries that are planning, expanding, or constructing new facilities. Two projects are in predesign stages, four represent new construction, and four involve renovations to existing libraries. The Texas Medical Association Library, the King Faisal Specialist Hospital and Research Centre Library, and the Northwestern University Galter Health Sciences Library illustrate how these libraries are being designed for the future and take into account areas of change produced by new information technologies, curricular trends, and new ways to deliver library services. Images PMID:7599586

  19. Construction. A Report on the Industry

    DTIC Science & Technology

    2004-06-01

    Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The

  20. NASA Langley Low Speed Aeroacoustic Wind Tunnel: Background Noise and Flow Survey Results Prior to FY05 Construction of Facilities Modifications

    NASA Technical Reports Server (NTRS)

    Booth, Earl R., Jr.; Henderson, Brenda S.

    2005-01-01

    The NASA Langley Research Center Low Speed Aeroacoustic Wind Tunnel is a premier facility for model-scale testing of jet noise reduction concepts at realistic flow conditions. However, flow inside the open jet test section is less than optimum. A Construction of Facilities project, scheduled for FY 05, will replace the flow collector with a new design intended to reduce recirculation in the open jet test section. The reduction of recirculation will reduce background noise levels measured by a microphone array impinged by the recirculation flow and will improve flow characteristics in the open jet tunnel flow. In order to assess the degree to which this modification is successful, background noise levels and tunnel flow are documented, in order to establish a baseline, in this report.

  1. Nanotechnology on a dime: building affordable research facilities

    NASA Astrophysics Data System (ADS)

    DiBattista, Jeff; Clare, Donna; Lynch, David

    2005-08-01

    Designing buildings to house nanotechnology research presents a multitude of well-recognized challenges to architectural and engineering design teams, from environmental control to spatial arrangements to operational functionality. These technical challenges can be solved with relative ease on projects with large budgets: designers have the option of selecting leading-edge systems without undue regard for their expense. This is reflected in the construction cost of many nanotechnology research facilities that run well into the hundreds of millions of dollars. Smaller universities and other institutions need not be shut out of the nanotechnology research field simply because their construction budgets are tens of millions of dollars or less. The key to success for these less expensive projects lies with making good strategic decisions: identifying priorities for the facility in terms of what it will is--and will not--provide to the researchers. Making these strategic decisions puts bounds on the tactical, technical problems that the design team at large must address, allowing them to focus their efforts on the key areas for success. The process and challenges of this strategic decision-making process are examined, with emphasis placed on the types of decisions that must be made and the factors that must be considered when making them. Case study examples of projects undertaken at the University of Alberta are used to illustrate how strategic-level decision-making sets the stage for cutting-edge success on a modest budget.

  2. Solar Radar Experiments

    DTIC Science & Technology

    1998-01-01

    communications satellites and electric power grids. RELATED PROJECTS Studies with the HAARP radar facility being constructed in Alaska are conducted with...on wave-plasma interactions and also are assessing the possible use of HAARP as a solar radar. REFERENCES James, J. C., Radar studies of the sun, in

  3. Developing and Testing a Framework for Alternative Ownership, Tenure and Governance Strategies for the Proposed Detroit-Windsor River Crossing - Phase II

    DOT National Transportation Integrated Search

    2010-10-01

    Transportation infrastructures are integral parts of a nations network connectivity. Largescale transportation projects represent major investments devoted to the construction, operation, and maintenance of facilities over an extended period. Typi...

  4. Developing and testing a framework for alternate ownership, tenure and governance strategies for the proposed Detroit-Windsor River crossing : phase II report.

    DOT National Transportation Integrated Search

    2010-10-01

    Transportation infrastructures are integral parts of a nations network connectivity. Largescale : transportation projects represent major investments devoted to the construction, operation, : and maintenance of facilities over an extended period. ...

  5. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have fewer, less well-defined phases, but can still be characterized by phases representing general or...

  6. QUALITY ASSURANCE AND QUALITY CONTROL FOR WASTE CONTAINMENT FACILITIES. Project Summary

    EPA Science Inventory

    It is generally agreed that both quality assurance (QA) and quality control (QC) are essential to the proper installation and eventual performance of environmentally safe and secure waste containment systems. Even further, there are both manufacturing and construction aspects to...

  7. 77 FR 13610 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... Information Collection Activity; Comment Request Proposed Project Title: Head Start Facilities Construction, Purchase and Major Renovations. OMB No.: 0970-0193. Description: The Head Start Bureau is proposing to.... The part contains the administrative requirements applicable to Head Start and Early Head Start...

  8. 30 CFR 285.658 - Can my cable or pipeline construction deviate from my approved COP or GAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER..., RUE grant, or your lease addendum for a project easement in connection with your COP or GAP. (c) If...

  9. Pace slows in northern Rockies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-03-01

    This paper deals with recent natural gas development and production in the northern Rocky Mountain region. Because of restricted gas markets, the pace has slowed construction of gas processing and gathering facilities. The gas and oil companies which are planning or building new projects are discussed.

  10. 40 CFR 144.33 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics; (2) Within the same well field, facility site, reservoir, project, or similar unit in the same...) The requirements for construction, monitoring, reporting, operation, and abandonment, for all wells...; and (3) The cumulative effects of drilling and operation of additional injection wells are considered...

  11. A3 Subscale Diffuser Test Article Design

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.

    2009-01-01

    This paper gives a detailed description of the design of the A3 Subscale Diffuser Test (SDT) Article Design. The subscale diffuser is a geometrically accurate scale model of the A3 altitude rocket facility. It was designed and built to support the SDT risk mitigation project located at the E3 facility at Stennis Space Center, MS (SSC) supporting the design and construction of the A3 facility at SSC. The subscale test article is outfitted with a large array of instrumentation to support the design verification of the A3 facility. The mechanical design of the subscale diffuser and test instrumentation are described here

  12. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  13. Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

    NASA Technical Reports Server (NTRS)

    Micol, John R.

    2001-01-01

    Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (CoF) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design Of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

  14. Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

    NASA Technical Reports Server (NTRS)

    Micol, John R.

    2001-01-01

    Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (Car) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

  15. Indonesia; World Bank assists Second Population Project.

    PubMed

    1977-01-01

    Indonesia's First Population Project, funded jointly by the International Development Association and UNFPA, was started in 1972 and provided for construction of service and training facilities, equipment, research and evaluation studies, education, and communication activities. The national family planning program has made progress in the last 20 years. Acceptor and family planning personnel statistics are given. The World Bank has recently awarded Indonesia a loan to fund its Second Population Project, to aid in reaching the goal of a 50% reduction in fertility by 2000.

  16. Lunar base and Mars base design projects

    NASA Technical Reports Server (NTRS)

    Amos, J.; Campbell, J.; Hudson, C.; Kenny, E.; Markward, D.; Pham, C.; Wolf, C.

    1989-01-01

    The space design classes at the University of Texas at Austin undertook seven projects in support of the NASA/USRA advanced space design program during the 1988-89 year. A total of 51 students, including 5 graduate students, participated in the design efforts. Four projects were done within the Aerospace Engineering (ASE) design program and three within the Mechanical Engineering (ME) program. Both lunar base and Mars base design efforts were studied, and the specific projects were as follows: Lunar Crew Emergency Rescue Vehicle (ASE); Mars Logistics Lander Convertible to a Rocket Hopper (ME); A Robotically Constructed Production and Supply Base on Phobos (ASE); A Mars/Phobos Transportation System (ASE); Manned Base Design and Related Construction Issues for Mars/Phobos Mission (ME); and Health Care Needs for a Lunar Colony and Design of Permanent Medical Facility (ME).

  17. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  18. A neutron beam facility for radioactive ion beams and other applications

    NASA Astrophysics Data System (ADS)

    Tecchio, L. B.

    1999-06-01

    In the framework of the Italian participation in the project of a high intensity proton facility for the energy amplifier and nuclear waste transmutations, LNL is involved in the design and construction of same prototypes of the injection system of the 1 GeV linac that consists of a RFQ (5 MeV, 30 mA) followed by a 100 MeV linac. This program has already been supported financially and the work is in progress. In this context LNL has proposed a project for the construction of a second generation facility for the production of radioactive ion beams (RIBs) by means of the ISOL method. The final goal is the production of neutron rich RIBs with masses ranging from 30 to 150 by using primary beams of protons, deuterons and light ions with energy of 100 MeV and 100 kW power. This project is expected to be developed in about 10 years from new and intermediate milestones and experiments are foreseen and under consideration for the next INFN five year plan (1999-2003). During that period the construction of a proton/deuteron accelerator of 10 MeV energy and 10 mA current, consisting of a RFQ (5 MeV, 30 mA) and a linac (10 MeV, 10 mA), and of a neutron area dedicated to the RIBs production and to the neutron physics, is proposed. Some remarks on the production methods will be presented. The possibility of producing radioisotopes by means of the fission induced by neutrons will be investigated and the methods of production of neutrons will be discussed. Besides the RIBs production, neutron beams for the BNCT applications and neutron physics are also planned.

  19. Artist Concept of Atlantis' new home

    NASA Image and Video Library

    2012-01-18

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers are constructing 40-foot-diameter dish antenna arrays for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. The antennas will be part of the operations command center facility. The construction site is near the former Vertical Processing Facility, which has been demolished. The Ka-BOOM project is one of the final steps in developing the techniques to build a high power, high resolution radar system capable of becoming a Near Earth Object Early Warning System. While also capable of space communication and radio science experiments, developing radar applications is the primary focus of the arrays. Photo credit: NASA/ Ben Smegelsky

  20. Transitioning to a New Facility: The Crucial Role of Employee Engagement.

    PubMed

    Slosberg, Meredith; Nejati, Adeleh; Evans, Jennie; Nanda, Upali

    Transitioning to a new facility can be challenging for employees and detrimental to operations. A key aspect of the transition is employee understanding of, and involvement in, the design of the new facility. The literature lacks a comprehensive study of the impact of change engagement throughout the design, construction, and activation of a project as well as how that can affect perceptions, expectations, and, eventually, satisfaction of employees. The purpose of this research was to examine employee perceptions and satisfaction throughout a hospital design, construction, and activation process. Three pulse-point surveys were administered throughout the transition of a children's hospital emergency department and neonatal intensive care unit to a new facility. We also administered a postoccupancy survey 3 months after the move into the new facility. We received 544 responses and analyzed them to assess the relationship between involvement in design or change engagement initiatives and overall perceptions. The results revealed a strong relationship between employee engagement and their level of preparedness to move, readiness to adapt, and satisfaction. Early involvement in the design of a facility or new processes can significantly affect staff preparedness and readiness to adapt as well as employees' overall satisfaction with the building after occupancy. In addition, our findings suggest that keeping a finger on the pulse of employee perceptions and expectations throughout the design, construction, and activation phase is critical to employee preparedness and satisfaction in transitioning to a new facility.

  1. Radioactive Waste Management at the New Conversion Facility of 'TVEL'{sup R} Fuel Company - 13474

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Indyk, S.I.; Volodenko, A.V.; Tvilenev, K.A.

    2013-07-01

    The project on the new conversion facility construction is being implemented by Joint Stock Company (JSC) 'Siberian Group of Chemical Enterprises' (SGChE) within TVEL{sup R} Fuel Company. The objective is to construct the up-to-date facility ensuring the industrial and environmental safety with the reduced impact on the community and environment in compliance with the Russian new regulatory framework on radioactive waste (RW) management. The history of the SGChE development, as well as the concepts and approaches to RW management implemented by now are shown. The SGChE future image is outlined, together with its objectives and concept on RW management inmore » compliance with the new act 'On radioactive waste management' adopted in Russia in 2011. Possible areas of cooperation with international companies are discussed in the field of RW management with the purpose of deploying the best Russian and world practices on RW management at the new conversion facility. (authors)« less

  2. 34 CFR 75.607 - General considerations in designing facilities and carrying out construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... architecture and design and inclusion of works of art. The grantee may not spend more than one percent of the cost of the project on inclusion of works of art. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  3. 34 CFR 75.607 - General considerations in designing facilities and carrying out construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... architecture and design and inclusion of works of art. The grantee may not spend more than one percent of the cost of the project on inclusion of works of art. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  4. 34 CFR 75.607 - General considerations in designing facilities and carrying out construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... architecture and design and inclusion of works of art. The grantee may not spend more than one percent of the cost of the project on inclusion of works of art. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  5. Lease-Purchase Program Applicant Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This manual guides applicants through the process of acquiring and managing California state funds for public school facility construction projects. Section 1 focuses on determining eligibility and on preparing application packages for Phase P approval and/or apportionment. Section 2 examines regulations and required forms for selecting school…

  6. 25 CFR 170.460 - What must a project package include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....460 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Review... environmental, archeological, and cultural clearances; and (4) Identification of design exceptions if used in...

  7. 34 CFR 75.607 - General considerations in designing facilities and carrying out construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... architecture and design and inclusion of works of art. The grantee may not spend more than one percent of the cost of the project on inclusion of works of art. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  8. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  9. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  10. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  11. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  12. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  13. 34 CFR 75.607 - General considerations in designing facilities and carrying out construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... architecture and design and inclusion of works of art. The grantee may not spend more than one percent of the cost of the project on inclusion of works of art. (Authority: 20 U.S.C. 1221e-3 and 3474) ...

  14. 2 CFR 215.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... the acquisition of equipment, buildings or land, the total value of the donated property may be...

  15. 34 CFR 74.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...

  16. 34 CFR 74.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...

  17. 34 CFR 74.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...

  18. 43 CFR 12.923 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  19. 22 CFR 226.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  20. 22 CFR 226.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  1. 34 CFR 74.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...

  2. 43 CFR 12.923 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  3. 43 CFR 12.923 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  4. 43 CFR 12.923 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  5. 22 CFR 226.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  6. 34 CFR 74.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accordance with the applicable cost principles. If the Secretary authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated.... (g) The method used for determining cost sharing or matching for donated equipment, buildings, and...

  7. 43 CFR 12.923 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... to acquire equipment, buildings, or land, the total value of the donated property may be claimed as.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  8. 22 CFR 226.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... accordance with the applicable cost principles. If USAID authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  9. ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahlmeister, J E; Haberer, W V; Casey, D F

    1960-12-15

    The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less

  10. KSC-2009-6452

    NASA Image and Video Library

    2009-11-19

    CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Bob Cabana addresses the audience on hand for the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann

  11. Design and construction of the Discovery Channel Telescope enclosure

    NASA Astrophysics Data System (ADS)

    Marshall, Heather K.; Teran, Jose U.; Bond, Kevin

    2010-07-01

    The Discovery Channel Telescope (DCT) is a project of Lowell Observatory, undertaken with support from Discovery Communications, Inc., to design and construct a 4-meter class telescope and support facility on a site approximately 40 miles southeast of Flagstaff, Arizona. The Discovery Channel Telescope Enclosure was completed in November, 2009. The DCT Enclosure is an octagonal steel structure with insulated composite panel skin. The structure rotates on sixteen compliant bogie assemblies attached to the stationary facility. The shutter is composed of two independently actuated, bi-parting structures that provide a viewing aperture. To improve seeing, the skin is covered with adhesive aluminum foil tape and the enclosed observing area is passively ventilated via rollup doors. The observing area can also be actively ventilated using a downdraft fan, and there are provisions for upgrades to active air conditioning. The enclosure also includes operational equipment such as a bridge crane, personnel lift, and access platforms. This paper discusses some of the design trades as well as the construction challenges and lessons learned by the DCT Project, its designer M3 Engineering and Technology Corporation (M3), and its general contractor, Building and Engineering Contractors, Southwest (BEC Southwest).

  12. Space station systems analysis study. Part 3: Documentation. Volume 7: SCB alternate EPS evaluation, task 10

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Power levels up to 100 kWe average were baselined for the electrical power system of the space construction base, a long-duration manned facility capable of supporting manufacturing and large scale construction projects in space. Alternatives to the solar array battery systems discussed include: (1) solar concentrator/brayton; (2) solar concentrator/thermionic; (3) isotope/brayton; (4) nuclear/brayton; (5) nuclear thermoelectric; and (6) nuclear thermionic.

  13. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  14. A retrospective tiered environmental assessment of the Mount Storm Wind Energy Facility, West Virginia,USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Efroymson, Rebecca Ann; Day, Robin; Strickland, M. Dale

    Bird and bat fatalities from wind energy projects are an environmental and public concern, with post-construction fatalities sometimes differing from predictions. Siting facilities in this context can be a challenge. In March 2012 the U.S. Fish and Wildlife Service (USFWS) released Land-based Wind Energy Guidelines to assess collision fatalities and other potential impacts to species of concern and their habitats to aid in siting and management. The Guidelines recommend a tiered approach for assessing risk to wildlife, including a preliminary site evaluation that may evaluate alternative sites, a site characterization, field studies to document wildlife and habitat and to predictmore » project impacts, post construction studies to estimate impacts, and other post construction studies. We applied the tiered assessment framework to a case study site, the Mount Storm Wind Energy Facility in Grant County, West Virginia, USA, to demonstrate the use of the USFWS assessment approach, to indicate how the use of a tiered assessment framework might have altered outputs of wildlife assessments previously undertaken for the case study site, and to assess benefits of a tiered ecological assessment framework for siting wind energy facilities. The conclusions of this tiered assessment for birds are similar to those of previous environmental assessments for Mount Storm. This assessment found risk to individual migratory tree-roosting bats that was not emphasized in previous preconstruction assessments. Differences compared to previous environmental assessments are more related to knowledge accrued in the past 10 years rather than to the tiered structure of the Guidelines. Benefits of the tiered assessment framework include good communication among stakeholders, clear decision points, a standard assessment trajectory, narrowing the list of species of concern, improving study protocols, promoting consideration of population-level effects, promoting adaptive management through post-construction assessment and mitigation, and sharing information that can be used in other assessments.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenberg, Raymond; Wright, Kyle A.; McCaw, Erica E.

    The Global Threat Reduction Initiative (GTRI) reduces and protects vulnerable nuclear and radiological material located at civilian sites worldwide. Internationally, over 40 countries are cooperating with GTRI to enhance the security of these materials. The GTRI program has worked successfully with foreign countries to remove and protect nuclear and radioactive materials, including orphaned and disused high-activity sources. GTRI began cooperation with the Republic of Colombia in April 2004. This cooperation has been a resounding success by securing forty high-risk sites, consolidating disused/orphan sources at an interim secure national storage facility, and developing a comprehensive approach to security, training, and sustainability.more » In 2005 the Colombian Ministry of Mines and Energy requested the Department of Energy’s support in the construction of a new Central Storage Facility (CSF). In December 2005, the Ministry selected to construct this facility at the Institute of Geology and Mining (Ingeominas) site in Bogota. This site already served as Colombia’s national repository, where disused sources were housed in various buildings around the complex. The CSF project was placed under contract in May 2006, but environmental issues and public protests, which led to a class action lawsuit against the Colombian Government, forced the Ministry to quickly suspend activities, thereby placing the project in jeopardy. Despite these challenges, however, the Ministry of Mines and Energy worked closely with public and environmental authorities to resolve these issues, and continued to be a strong advocate of the GTRI program. In June 2008, the Ministry of Mines and Energy was granted the construction and environmental licenses. As a result, construction immediately resumed and the CSF was completed by December 2008. A commissioning ceremony was held for the new facility in January 2009, which was attended by representatives from the Department of Energy, U.S. Embassy, and the Ministry of Mines and Energy, including the Minister and Vice Minister.« less

  16. Space Station Facility government estimating

    NASA Technical Reports Server (NTRS)

    Brown, Joseph A.

    1993-01-01

    This new, unique Cost Engineering Report introduces the 800-page, C-100 government estimate for the Space Station Processing Facility (SSPF) and Volume IV Aerospace Construction Price Book. At the January 23, 1991, bid opening for the SSPF, the government cost estimate was right on target. Metric, Inc., Prime Contractor, low bid was 1.2 percent below the government estimate. This project contains many different and complex systems. Volume IV is a summary of the cost associated with construction, activation and Ground Support Equipment (GSE) design, estimating, fabrication, installation, testing, termination, and verification of this project. Included are 13 reasons the government estimate was so accurate; abstract of bids, for 8 bidders and government estimate with additive alternates, special labor and materials, budget comparison and system summaries; and comments on the energy credit from local electrical utility. This report adds another project to our continuing study of 'How Does the Low Bidder Get Low and Make Money?' which was started in 1967, and first published in the 1973 AACE Transaction with 18 ways the low bidders get low. The accuracy of this estimate proves the benefits of our Kennedy Space Center (KSC) teamwork efforts and KSC Cost Engineer Tools which are contributing toward our goals of the Space Station.

  17. A preliminary analysis of recent HVAC energy projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaddy, P.J.; Haake, C.F.

    A typical Government HVAC design over the last 30 years consisted of two oversized (equal tonnage) electric chillers, two oversized (equal NBTU ratings) boilers, an air economizer cycle, a constant air volume system and a central station pneumatic control system. This typical basic layout for plant design has certain advantages such as simplicity and ease to construct throughout the country. The cookie cutter design/build approach suited federal facilities, when utility costs were not a major consideration, in-house maintenance and operations personnel were plentiful and energy conservation was a moral priority and not an economic concern. Those days are history asmore » energy costs have escalated and operating budgets continue to shrink leaving fewer personnel to maintain the same buildings. Advances in HVAC technology and the reduction in costs for energy efficient systems have finally started affecting the Federal Government`s HVAC replacement and new construction designs. This paper is a brief description of three HVAC projects that go outside the traditional government HVAC design parameters. GSA`s Pacific Rim Region, covering the states of Hawaii, California, Nevada, and Arizona, has implemented three HVAC projects utilizing different technologies not normally found in GSA Federal facilities.« less

  18. Development of target ion source systems for radioactive beams at GANIL

    NASA Astrophysics Data System (ADS)

    Bajeat, O.; Delahaye, P.; Couratin, C.; Dubois, M.; Franberg-Delahaye, H.; Henares, J. L.; Huguet, Y.; Jardin, P.; Lecesne, N.; Lecomte, P.; Leroy, R.; Maunoury, L.; Osmond, B.; Sjodin, M.

    2013-12-01

    The GANIL facility (Caen, France) is dedicated to the acceleration of heavy ion beams including radioactive beams produced by the Isotope Separation On-Line (ISOL) method at the SPIRAL1 facility. To extend the range of radioactive ion beams available at GANIL, using the ISOL method two projects are underway: SPIRAL1 upgrade and the construction of SPIRAL2. For SPIRAL1, a new target ion source system (TISS) using the VADIS FEBIAD ion source coupled to the SPIRAL1 carbon target will be tested on-line by the end of 2013 and installed in the cave of SPIRAL1 for operation in 2015. The SPIRAL2 project is under construction and is being design for using different production methods as fission, fusion or spallation reactions to cover a large area of the chart of nuclei. It will produce among others neutron rich beams obtained by the fission of uranium induced by fast neutrons. The production target made from uranium carbide and heated at 2000 °C will be associated with several types of ion sources. Developments currently in progress at GANIL for each of these projects are presented.

  19. Equally sloped tomography based X-ray full-field nano-CT at Shanghai Synchrotron Radiation Facility

    NASA Astrophysics Data System (ADS)

    Wang, Yudan; Ren, Yuqi; Zhou, Guangzhao; Du, Guohao; Xie, Honglan; Deng, Biao; Xiao, Tiqiao

    2018-07-01

    X-ray full-field nano-computed tomography (nano-CT) has non-destructive three-dimensional imaging capabilities with high spatial resolution, and has been widely applied to investigate morphology and structures in various areas. Conventional tomography reconstructs a 3D object from a large number of equal-angle projections. For nano-CT, it takes long collecting time due to the large projection numbers and long exposure time. Here, equally-sloped tomography (EST) based nano-CT was implemented and constructed on X-ray imaging beamline at the Shanghai Synchrotron Radiation Facility (SSRF) to overcome or alleviate these difficulties. Preliminary results show that hard TXM with the spatial resolution of 100 nm and the EST-based nano-CT with the ability of 3D nano non-destructive characterization have been realized. This technique promotes hard X-ray imaging capability to nano scales at SSRF and could have applications in many fields including nanomaterials, new energy and life sciences. The study will be helpful for the construction of the new full field X-ray nano-imaging beamline with the spatial resolution of 20 nm at SSRF phase II project.

  20. Spent nuclear fuel project cold vacuum drying facility operations manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IRWIN, J.J.

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less

  1. Simulation Enabled Safeguards Assessment Methodology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Bean; Trond Bjornard; Thomas Larson

    2007-09-01

    It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology (SESAME) has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements inmore » functionality. Drag and drop wireframe construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed.« less

  2. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  3. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  4. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  5. Bibliography of Selected SCSD, URBS, SSP, SEF, and RAS Publications.

    ERIC Educational Resources Information Center

    Stanford Univ., CA. School Planning Lab.

    The annotated bibliography contains publications and report listings of the following sources--(1) School Construction Systems Development (SCSD), (2) University Residential Building Systems (URBS), (3) Florida Schoolhouse Systems Project (SSP), (4) Study of Educational Facilities (SEF), and (5) Recherches en Amenagements Scolaires (RAS) Building…

  6. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  7. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  8. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  9. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  10. 36 CFR § 1210.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...

  11. 14 CFR 1260.123 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  12. 36 CFR 1210.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...

  13. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  14. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  15. 14 CFR 1260.123 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  16. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  17. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  18. 14 CFR 1260.123 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  19. 14 CFR 1260.123 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... accordance with the applicable cost principles. If NASA authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property for cost.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and...

  20. 36 CFR 1210.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...

  1. 20 CFR 435.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SSA authorizes recipients to donate buildings or land for construction/facilities acquisition projects... acquisition of equipment, buildings or land, the total value of the donated property may be claimed as cost... method used for determining cost sharing or matching for donated equipment, buildings and land for which...

  2. 36 CFR 1210.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... accordance with the applicable cost principles. If the NHPRC authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated... matching for donated equipment, buildings and land for which title passes to the recipient may differ...

  3. 15 CFR 2301.6 - Amount of Federal funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...

  4. 15 CFR 2301.6 - Amount of Federal funding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...

  5. 15 CFR 2301.6 - Amount of Federal funding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...

  6. 15 CFR 2301.6 - Amount of Federal funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...

  7. 15 CFR 2301.6 - Amount of Federal funding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Amount of Federal funding. 2301.6... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.6 Amount of Federal funding. (a) Planning... a public telecommunications construction project. (1) Seventy-five (75) percent Federal funding will...

  8. The 'bankability' of the new waste technologies: an econometric method for risk sharing in private finance waste contracts.

    PubMed

    Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J

    2011-12-01

    The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.

  9. Coal ash by-product reutilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muncy, J.; Miller, B.

    1997-09-01

    Potomac Electric Power Company (PEPCO) has as part of its vision and value statement that, ``We are responsible stewards of environmental and corporate resources.`` With this moral imperative in mind, a project team was charged with initiating the Coal Pile Liner Project--installing a membrane liner under the existing coal storage pile at the Morgantown Generating Station. The existing coal yard facilities were constructed prior to the current environmental regulations, and it became necessary to upgrade the storage facilities to be environmentally friendly. The project team had two objectives in this project: (1) prevent coal pile leachate from entering the groundwatermore » system; (2) test the viability of using coal ash by-products as an aggregate substitute for concrete applications. Both objectives were met, and two additional benefits were achieved as well: (1) the use of coal ash by-products as a coal liner produced significant cost savings to the project directly; (2) the use of coal ash by-products reduced plant operation and maintenance expenses.« less

  10. Application Analysis of BIM Technology in Metro Rail Transit

    NASA Astrophysics Data System (ADS)

    Liu, Bei; Sun, Xianbin

    2018-03-01

    With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.

  11. TA-55 change control manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blum, T.W.; Selvage, R.D.; Courtney, K.H.

    This manual is the guide for initiating change at the Plutonium Facility, which handles the processing of plutonium as well as research on plutonium metallurgy. It describes the change and work control processes employed at TA-55 to ensure that all proposed changes are properly identified, reviewed, approved, implemented, tested, and documented so that operations are maintained within the approved safety envelope. All Laboratory groups, their contractors, and subcontractors doing work at TA-55 follow requirements set forth herein. This manual applies to all new and modified processes and experiments inside the TA-55 Plutonium Facility; general plant project (GPP) and line itemmore » funded construction projects at TA-55; temporary and permanent changes that directly or indirectly affect structures, systems, or components (SSCs) as described in the safety analysis, including Facility Control System (FCS) software; and major modifications to procedures. This manual does not apply to maintenance performed on process equipment or facility SSCs or the replacement of SSCs or equipment with documented approved equivalents.« less

  12. Advanced Distributed Measurements and Data Processing at the Vibro-Acoustic Test Facility, GRC Space Power Facility, Sandusky, Ohio - an Architecture and an Example

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Evans, Richard K.

    2009-01-01

    A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.

  13. KSC-2011-1157

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far right, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  14. KSC-2011-1148

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  15. KSC-2011-1159

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far right, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  16. KSC-2011-1158

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, far left, shows off the environmentally friendly features of the new Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  17. KSC-2011-1146

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- Frank Kline, Construction of Facilities project manager at NASA's Kennedy Space Center in Florida, addresses an audience at the ribbon-cutting ceremony for the new environmentally friendly Propellants North Administration and Maintenance Facility. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  18. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories (Revised)

    DTIC Science & Technology

    2013-02-01

    or funds authorized under Section 219(a) for projects costing no more than $4M. Research , Development, Test , and Evaluation (RDT&E) Appropriations...The RDT&E appropriation consists of the mission program budgets for all research , development, test and evaluation work performed by contractors...carry out an unspecified minor military construction project costing not more than $4,000,000. 9 f. Research , Development, Test , and Evaluation

  19. Philadelphia gas works medium-Btu coal gasification project: environmental assessment. [GKT supplied by Krupp-Koppers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-12-01

    The coal gasification plant will occupy a 43-acre site, known as the Riverside Site, located along the Delaware River next to Port Richmond between the Betsy Ross and Benjamin Franklin Bridges. The cleared site was previously used for industrial purposes and has a G-2 industrial zoning. Adverse impacts during the construction phase of the project are not expected to be significantly different than those occurring during any major industrial construction project. During operation of the coal gasification facility, specific mitigative measures have been designed into the facility to avoid adverse environmental impacts wherever possible. In addition to these extensive engineeringmore » safeguards, elaborate monitoring and control instrumentation shall be used. The GKT entrained bed, oxygen-blown gasification process provided by Krupp/Koppers was selected because it is a commercially proven system and because of its positive environmental characteristics such as its ability to gasify many coal types and the fact that it does not produce tars, phenols, or ammonia. During gasification of the coal, pollutants such as heavy metals in the coal are concentrated into the slag and ash. None of these pollutants are found in the product gas. The facility will produce 250 tpd of non-hazardous slag and fly ash. The combined slag and fly ash will occupy 347 cubic yards per day of landfill volume. Available haulers and landfills have been identified.A sophisticated health and safety program will include appropriate monitoring instruments for CO, H/sub 2/, H/sub 2/S, polynuclear aromatic hydrocarbons, organic compounds, and coal dust. Air emissions from operation of the coal gasification plant are not considered significant. Dust control systems have been designed into the facility to minimize fugitive dust emissions.« less

  20. Turn Basin Construction

    NASA Image and Video Library

    2017-06-30

    At NASA's Kennedy Space Center in Florida, cement is poured as part of a construction project to upgrade the turn basin wharf. The work includes driving multiple precast concrete piles to a depth of about 70 feet to accommodate arrival of the core stage for the agency's Space Launch System (SLS) rocket. When the stage for NASA's SLS departs the Michoud Assembly Facility in New Orleans, it will be shipped by the agency's modified barge to the Launch Complex 39 turn basin.

  1. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, whichmore » were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.« less

  2. Progress on the accelerator based SPES-BNCT project at INFN Legnaro

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esposito, J.; Colautti, P.; Pisent, A.

    2007-02-12

    In the framework of an advanced Exotic Ion Beam facility, named SPES (Study and Production of Exotic Species), that will allow a frontier program both in nuclear and interdisciplinary physics, an intense thermal neutron beam facility, devoted to perform Boron Neutron Capture Therapy (BNCT) experimental treatments on skin melanoma tumor, is currently under construction based on the SPES proton driver. A vast radiobiological investigation in vitro and in vivo has started with the new 10B carriers developed. Special microdosimetric detectors have been constructed to properly measure all the BNCT dose components and their qualities. Both microdosimetric and radiobiological measurements aremore » being performed at the new HYTHOR beam shaping assembly at the Enea-Casaccia TAPIRO reactor.« less

  3. Geological Data Preservation Program Receives Bipartisan Support

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2014-09-01

    More than 22 million vertical feet of geologic cores and cuttings fill the Kentucky Geological Survey's Well Sample and Core Library in Lexington. The materials are from at least 22,000 sites within Kentucky—including collections from oil and gas exploration operations, coal and other mining companies, highway construction projects, environmental studies, and federal facilities such as Fort Knox—and they are straining the 15-year-old facility to the point where there is no room to keep everything, according to geologist Patrick Gooding, the library manager.

  4. Fuze Experimentation Facility and Fuze Industrial Facility (FEF/FIF) Construction. Final Environmental Assessment

    DTIC Science & Technology

    2011-04-01

    1-9. R esources N ot C arried Forw ard for D etailed A nalysis Legend Environmental Justice Concerns c:::J Proposed Project Area No Concerns...11 FEF/FIF C onstruction Environm ental A ssessm ent Page 3-6 Eglin A ir Force B ase, FL Final Figure 3-1. W ater R esources A t or N...Ecological A ssociations and Biological R esources A t or N ear the Proposed A ction Location Ecological Association Flatwoods Landscaped!Urban c:J

  5. Jim Green | NREL

    Science.gov Websites

    NWTC. He was the project lead for the design and construction of the NWTC 5.8 MW dynamometer facility completed in 2013. During 2012-2016, Jim was responsible for operations, safety, and engineering assessment of a successful net-power-producing experiment in Hawaii, a fully-functional and grid-connected OTEC

  6. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)? 285.620 Section 285.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE... project easement. The MMS will withhold trade secrets and commercial or financial information that is...

  7. 77 FR 47876 - Intent To Prepare Environmental Impact Statements: Potential Commercial Wind Lease Issuance and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Statoil NA's proposed project, Hywind Maine, would consist of four 3-megawatt (MW) floating wind turbine... request by Statoil NA, is to construct a full-scale, deepwater floating wind turbine facility that... Prepare Environmental Impact Statements: Potential Commercial Wind Lease Issuance and Decision Regarding...

  8. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  9. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  10. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  11. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  12. 22 CFR 145.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...

  13. 49 CFR 19.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...

  14. 22 CFR 518.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...

  15. 49 CFR 19.23 - Cost sharing or matching.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...

  16. 22 CFR 518.23 - Cost sharing or matching.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., buildings or land, the total value of the donated property may be claimed as cost sharing or matching. (2... applicable cost principles. If a Federal awarding agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the value of the donated property...

  17. 49 CFR 19.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agency authorizes recipients to donate buildings or land for construction/facilities acquisition projects... equipment, buildings or land, the total value of the donated property may be claimed as cost sharing or... determining cost sharing or matching for donated equipment, buildings and land for which title passes to the...

  18. 38 CFR 49.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recipients to donate buildings or land for construction/facilities acquisition projects or long-term use, the... sharing or matching for donated equipment, buildings and land for which title passes to the recipient may... purpose of the award is to assist the recipient in the acquisition of equipment, buildings or land, the...

  19. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

  20. 29 CFR 95.23 - Cost sharing or matching.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... buildings or land for construction/facilities acquisition projects or long-term use, the value of the.... (g) The method used for determining cost sharing or matching for donated equipment, buildings and... in the acquisition of equipment, buildings or land, the total value of the donated property may be...

Top