Sample records for facility design construction

  1. Facility design, construction, and operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less

  2. Design and Construction of a Hydroturbine Test Facility

    NASA Astrophysics Data System (ADS)

    Ayli, Ece; Kavurmaci, Berat; Cetinturk, Huseyin; Kaplan, Alper; Celebioglu, Kutay; Aradag, Selin; Tascioglu, Yigit; ETU Hydro Research Center Team

    2014-11-01

    Hydropower is one of the clean, renewable, flexible and efficient energy resources. Most of the developing countries invest on this cost-effective energy source. Hydroturbines for hydroelectric power plants are tailor-made. Each turbine is designed and constructed according to the properties, namely the head and flow rate values of the specific water source. Therefore, a center (ETU Hydro-Center for Hydro Energy Research) for the design, manufacturing and performance tests of hydraulic turbines is established at TOBB University of Economics and Technology to promote research in this area. CFD aided hydraulic and structural design, geometry optimization, manufacturing and performance tests of hydraulic turbines are the areas of expertise of this center. In this paper, technical details of the design and construction of this one of a kind test facility in Turkey, is explained. All the necessary standards of IEC (International Electrotechnical Commission) are met since the test facility will act as a certificated test center for hydraulic turbines.

  3. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  4. Design and construction of a full-scale lateral impact testing facility.

    DOT National Transportation Integrated Search

    2015-05-01

    The goal of this work is to design and construct a full scale lateral impact testing facility that is capable of recreating the damage that would be created by an overheight vehicle collision. This was accomplished by impacting a test specimen with 8...

  5. Establishment of a National Accelerator Facility: Design and construction phase

    NASA Astrophysics Data System (ADS)

    1981-06-01

    The main components of an accelerator facility for nuclear physics, isotope production, and radiotherapy in South Africa are in 8-MeV solid pole injector cyclotron and a separated sector cyclotron with a k-value of 200 MeV. Progress made in the development of the light ion injector and in the design of the control and beam transport systems is described. Mechanical and engineering tasks associated with component manufacture are discussed as well as the construction of the building to house the facility and the installation of necessary services.

  6. Risk management at the stage of design of high-rise construction facilities

    NASA Astrophysics Data System (ADS)

    Politi, Violetta

    2018-03-01

    This paper describes the assessment of the probabilistic risk of an accident formed in the process of designing a technically complex facility. It considers values of conditional probabilities of the compliance of load-bearing structures with safety requirements, provides an approximate list of significant errors of the designer and analyzes the relationship between the degree of compliance and the level of danger of errors. It describes and proposes for implementation the regulated procedures related to the assessment of the safety level of constructive solutions and the reliability of the construction process participants.

  7. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  8. Durability of a reinforced concrete designed for the construction of an intermediate-level radioactive waste disposal facility

    NASA Astrophysics Data System (ADS)

    Duffó, G. S.; Arva, E. A.; Schulz, F. M.; Vazquez, D. R.

    2012-01-01

    The National Atomic Energy Commission of the Argentine Republic is developing a nuclear waste disposal management programme that contemplates the design and construction of a facility for the final disposal of intermediate-level radioactive wastes. The repository is based on the use of multiple, independent and redundant barriers. The major components are made in reinforced concrete so, the durability of these structures is an important aspect for the facility integrity. This work presents an investigation performed on a reinforced concrete specifically designed for this purpose, to predict the service life of the intermediate level radioactive waste disposal facility from data obtained with several techniques. Results obtained with corrosion sensors embedded in a concrete prototype are also included. The information obtained will be used for the final design of the facility in order to guarantee a service life more or equal than the foreseen durability for this type of facilities.

  9. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  10. The status of LILW disposal facility construction in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan

    2013-07-01

    In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less

  11. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  12. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  13. Science Facilities Design Guidelines.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…

  14. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Facilities construction. 136.110 Section 136.110... Facilities and Services § 136.110 Facilities construction. In addition to other requirements of this subpart..., clinic, health station or quarters for housing personnel associated with such facilities, must in its...

  15. Virtual design and construction of plumbing systems

    NASA Astrophysics Data System (ADS)

    Filho, João Bosco P. Dantas; Angelim, Bruno Maciel; Guedes, Joana Pimentel; de Castro, Marcelo Augusto Farias; Neto, José de Paula Barros

    2016-12-01

    Traditionally, the design coordination process is carried out by overlaying and comparing 2D drawings made by different project participants. Detecting information errors from a composite drawing is especially challenging and error prone. This procedure usually leaves many design errors undetected until construction begins, and typically lead to rework. Correcting conflict issues, which were not identified during design and coordination phase, reduces the overall productivity for everyone involved in the construction process. The identification of construction issues in the field generate Request for Information (RFIs) that is one of delays causes. The application of Virtual Design and Construction (VDC) tools to the coordination processes can bring significant value to architecture, structure, and mechanical, electrical, and plumbing (MEP) designs in terms of a reduced number of errors undetected and requests for information. This paper is focused on evaluating requests for information (RFI) associated with water/sanitary facilities of a BIM model. Thus, it is expected to add improvements of water/sanitary facility designs, as well as to assist the virtual construction team to notice and identify design problems. This is an exploratory and descriptive research. A qualitative methodology is used. This study adopts RFI's classification in six analyzed categories: correction, omission, validation of information, modification, divergence of information and verification. The results demonstrate VDC's contribution improving the plumbing system designs. Recommendations are suggested to identify and avoid these RFI types in plumbing system design process or during virtual construction.

  16. The Influence of Building Codes on Recreation Facility Design.

    ERIC Educational Resources Information Center

    Morrison, Thomas A.

    1989-01-01

    Implications of building codes upon design and construction of recreation facilities are investigated (national building codes, recreation facility standards, and misperceptions of design requirements). Recreation professionals can influence architectural designers to correct past deficiencies, but they must understand architectural and…

  17. Construction Cost Growth for New Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubic, Jr., William L.

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less

  18. Design, construction and operation features of high-rise structures

    NASA Astrophysics Data System (ADS)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  19. 49 CFR 37.41 - Construction of transportation facilities by public entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... public entities. 37.41 Section 37.41 Transportation Office of the Secretary of Transportation... transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in providing designated public transportation services so that the facility is readily accessible to and usable...

  20. Dual-Spool Turbine Facility Design Overview

    NASA Technical Reports Server (NTRS)

    Giel, Paul; Pachlhofer, Pete

    2003-01-01

    The next generation of aircraft engines, both commercial and military, will attempt to capitalize on the benefits of close-coupled, vaneless, counter-rotating turbine systems. Experience has shown that significant risks and challenges are present with close-coupled systems in terms of efficiency and durability. The UEET program needs to demonstrate aerodynamic loading and efficiency goals for close-coupled, reduced-stage HP/LP turbine systems as a Level 1 Milestone for FY05. No research facility exists in the U.S. to provide risk reduction for successful development of close-coupled, high and low pressure turbine systems for the next generations of engines. To meet these objectives, the design, construction, and integrated systems testing of a Dual-Spool Turbine Facility (DSTF) facility has been initiated at the NASA Glenn Research Center. The facility will be a warm (-IOOO'F), continuous flow facility for overall aerodynamic performance and detailed flow field measurement acquisition. The facility will have state-of-the-art instrumentation to capture flow physics details. Accurate and reliable speed control will be achieved by utilizing the existing Variable Frequency Drive System. Utilization of this and other existing GRC centralized utilities will reduce the overall construction costs. The design allows for future installation of a turbine inlet combustor profile simulator. This presentation details the objectives of the facility and the concepts used in specifying its capabilities. Some preliminary design results will be presented along with a discussion of plans and schedules.

  1. Corrosion behaviour of steel rebars embedded in a concrete designed for the construction of an intermediate-level radioactive waste disposal facility

    NASA Astrophysics Data System (ADS)

    Duffó, G. S.; Arva, E. A.; Schulz, F. M.; Vazquez, D. R.

    2013-07-01

    The National Atomic Energy Commission of the Argentine Republic is developing a nuclear waste disposal management programme that contemplates the design and construction of a facility for the final disposal of intermediate-level radioactive wastes. The repository is based on the use of multiple, independent and redundant barriers. The major components are made in reinforced concrete so, the durability of these structures is an important aspect for the facility integrity. This work presents an investigation performed on an instrumented reinforced concrete prototype specifically designed for this purpose, to study the behaviour of an intermediate level radioactive waste disposal facility from the rebar corrosion point of view. The information obtained will be used for the final design of the facility in order to guarantee a service life more or equal than the foreseen durability for this type of facilities.

  2. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  3. 33 CFR 127.101 - Design and construction: General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Design and construction: General. 127.101 Section 127.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY... HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas § 127.101 Design and construction...

  4. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  5. Literature Related to Planning, Design and Construction of Science Facilities.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A list of the articles and papers in the science facilities collection of the Architectural Services Staff is presented. It has been prepared to serve as a bibliography that may be useful to persons searching for data on the design of science facilities, and as a means of informing such persons of the material available for reference in the…

  6. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  7. Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…

  8. Peculiarities of organizing the construction of nuclear medicine facilities and the transportation of radionuclide

    NASA Astrophysics Data System (ADS)

    Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor

    2017-10-01

    The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.

  9. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  10. Design, construction and management of tailings storage facilities for surface disposal in China: case studies of failures.

    PubMed

    Wei, Zuoan; Yin, Guangzhi; Wang, J G; Wan, Ling; Li, Guangzhi

    2013-01-01

    Rapid development of China's economy demands for more mineral resources. At the same time, a vast quantity of mine tailings, as the waste byproduct of mining and mineral processing, is being produced in huge proportions. Tailings impoundments play an important role in the practical surface disposal of these large quantities of mining waste. Historically, tailings were relatively small in quantity and had no commercial value, thus little attention was paid to their disposal. The tailings were preferably discharged near the mines and few tailings storage facilities were constructed in mainland China. This situation has significantly changed since 2000, because the Chinese economy is growing rapidly and Chinese regulations and legislation require that tailings disposal systems must be ready before the mining operation begins. Consequently, data up to 2008 shows that more than 12 000 tailings storage facilities have been built in China. This paper reviews the history of tailings disposal in China, discusses three cases of tailings dam failures and explores failure mechanisms, and the procedures commonly used in China for planning, design, construction and management of tailings impoundments. This paper also discusses the current situation, shortcomings and key weaknesses, as well as future development trends for tailings storage facilities in China.

  11. How to Tackle Tough Facility Design Considerations

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    This article is part of a series that has offered insight on planning a facilities project, hiring professionals, delivery system options and owner's responsibilities. In this article, the author focuses on some of the planning and design concepts one may be asked to consider in providing direction to his design and construction team. These…

  12. Design and Construction of an Urban Runoff Research Facility

    PubMed Central

    Wherley, Benjamin G.; White, Richard H.; McInnes, Kevin J.; Fontanier, Charles H.; Thomas, James C.; Aitkenhead-Peterson, Jacqueline A.; Kelly, Steven T.

    2014-01-01

    As the urban population increases, so does the area of irrigated urban landscape. Summer water use in urban areas can be 2-3x winter base line water use due to increased demand for landscape irrigation. Improper irrigation practices and large rainfall events can result in runoff from urban landscapes which has potential to carry nutrients and sediments into local streams and lakes where they may contribute to eutrophication. A 1,000 m2 facility was constructed which consists of 24 individual 33.6 m2 field plots, each equipped for measuring total runoff volumes with time and collection of runoff subsamples at selected intervals for quantification of chemical constituents in the runoff water from simulated urban landscapes. Runoff volumes from the first and second trials had coefficient of variability (CV) values of 38.2 and 28.7%, respectively. CV values for runoff pH, EC, and Na concentration for both trials were all under 10%. Concentrations of DOC, TDN, DON, PO4-P, K+, Mg2+, and Ca2+ had CV values less than 50% in both trials. Overall, the results of testing performed after sod installation at the facility indicated good uniformity between plots for runoff volumes and chemical constituents. The large plot size is sufficient to include much of the natural variability and therefore provides better simulation of urban landscape ecosystems. PMID:25146420

  13. Space artificial gravity facilities - An approach to their construction

    NASA Technical Reports Server (NTRS)

    Wercinski, P. F.; Searby, N. D.; Tillman, B. W.

    1988-01-01

    In the course of adaptation to a space microgravity environment, humans experience cardiovascular deconditioning, loss of muscle mass, and loss of bone minerals. One possible solution to these space adaptation problems is to simulate earth's gravity using the centripetal acceleration created by a rotating system. The design and construction of rotating space structures pose many challenges. Before committing to the use of artificial gravity in future space missions, a man-rated Variable Gravity Research Facility (VGRF) should be developed in earth orbit as a gravitational research tool and testbed. This paper addresses the requirements and presents preliminary concepts for such a facility.

  14. Sports Fields: A Manual for Design Construction and Maintenance.

    ERIC Educational Resources Information Center

    Puhalla, Jim; Krans, Jeff; Goatley, Mike

    Comprehensive technical reference information is provided for those responsible for the design, construction, renovation, or maintenance of sports grounds. Chapters illustrate specific design elements of all popular sports facilities, and explain how those elements are integrated in a successful project; explore commonly encountered sports field…

  15. AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION

    NASA Technical Reports Server (NTRS)

    1974-01-01

    AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY CONSTRUCTION KSC-374C-10236.33 108-KSC-374C-10236.33, P-15911, ARCHIVE-04477 Shuttle runway facility construction progress - oblique vertical, altitude 3,000 ft. time 1030 - direction south - south half from center.

  16. Design and construction of the X-2 two-stage free piston driven expansion tube

    NASA Technical Reports Server (NTRS)

    Doolan, Con

    1995-01-01

    This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.

  17. Ultraviolet Free Electron Laser Facility preliminary design report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ben-Zvi, I.

    1993-02-01

    This document, the Preliminary Design Report (PDR) for the Brookhaven Ultraviolet Free Electron Laser (UV FEL) facility, describes all the elements of a facility proposed to meet the needs of a research community which requires ultraviolet sources not currently available as laboratory based lasers. Further, for these experiments, the requisite properties are not extant in either the existing second or upcoming third generation synchrotron light sources. This document is the result of our effort at BNL to identify potential users, determine the requirements of their experiments, and to design a facility which can not only satisfy the existing need, butmore » have adequate flexibility for possible future extensions as need dictates and as evolving technology allows. The PDR is comprised of three volumes. In this, the first volume, background for the development of the proposal is given, including descriptions of the UV FEL facility, and representative examples of the science it was designed to perform. Discussion of the limitations and potential directions for growth are also included. A detailed description of the facility design is then provided, which addresses the accelerator, optical, and experimental systems. Information regarding the conventional construction for the facility is contained in an addendum to volume one (IA).« less

  18. Design and construction of a time-of-flight wall detector at External Target Facility of HIRFL-CSR

    NASA Astrophysics Data System (ADS)

    Sun, Y.; Sun, Z. Y.; Yu, Y. H.; Yan, D.; Tang, S. W.; Sun, Y. Z.; Wang, S. T.; Zhang, X. H.; Yue, K.; Fang, F.; Chen, J. L.; Zhang, Y. J.; Hu, B. T.

    2018-06-01

    A Time-Of-Flight Wall (TOFW) detector has been designed and constructed at the External Target Facility (ETF) of HIRFL-CSR. The detector covers a sensitive area of 1.2 × 1.2 m2 and consists of 30 modules. Each module is composed of a long plastic scintillator bar with two photo-multiplier tubes coupled at both ends for readout. The design and manufacture details are described and the test results are reported. The performance of the TOFW detector has been tested and measured with cosmic rays and a 310 MeV/u 40Ar beam. The results show that the time resolutions of all the TOFW modules are better than 128 ps, satisfying the requirements of the experiments which will be carried out at the ETF.

  19. 48 CFR 1830.7002 - Facilities capital employed for facilities under construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Facilities capital employed for facilities under construction. 1830.7002 Section 1830.7002 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING...

  20. 49 CFR 37.41 - Construction of transportation facilities by public entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Construction of transportation facilities by... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.41 Construction of transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in...

  1. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  2. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  3. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  4. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  5. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  6. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  7. The Advanced Technology Solar Telescope: design and early construction

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer

    2012-09-01

    The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of

  8. 21 CFR 211.42 - Design and construction features.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Design and construction features. 211.42 Section 211.42 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Buildings and Facilities...

  9. POWER-BURST FACILITY (PBF) CONCEPTUAL DESIGN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wasserman, A.A.; Johnson, S.O.; Heffner, R.E.

    1963-06-21

    A description is presented of the conceptual design of a high- performance, pulsed reactor called the Power Burst Facility (PBF). This reactor is designed to generate power bursts with initial asymptotic periods as short as 1 msec, producing energy releases large enough to destroy entire fuel subassemblies placed in a capsule or flow loop mounted in the reactor, all without damage to the reactor itself. It will be used primarily to evaluate the consequences and hazards of very rapid destructive accidents in reactors representing the entire range of current nuclear technology as applied to power generation, propulsion, and testing. Itmore » will also be used to carry out detailed studies of nondestructive reactivity feedback mechanisms in the shortperiod domain. The facility was designed to be sufficiently flexible to accommodate future cores of even more advanced design. The design for the first reactor core is based upon proven technology; hence, completion of the final design of this core will involve no significant development delays. Construction of the PBF is proposed to begin in September 1984, and is expected to take approximately 20 months to complete. (auth)« less

  10. 21 CFR 129.20 - Plant construction and design.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 2 2011-04-01 2011-04-01 false Plant construction and design. 129.20 Section 129.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION PROCESSING AND BOTTLING OF BOTTLED DRINKING WATER Buildings and Facilities...

  11. 21 CFR 129.20 - Plant construction and design.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Plant construction and design. 129.20 Section 129.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION PROCESSING AND BOTTLING OF BOTTLED DRINKING WATER Buildings and Facilities...

  12. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  13. Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE): Conceptual Design Report. Volume 3: Long-Baseline Neutrino Facility for DUNE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strait, James; McCluskey, Elaine; Lundin, Tracy

    2016-01-21

    This volume of the LBNF/DUNE Conceptual Design Report covers the Long-Baseline Neutrino Facility for DUNE and describes the LBNF Project, which includes design and construction of the beamline at Fermilab, the conventional facilities at both Fermilab and SURF, and the cryostat and cryogenics infrastructure required for the DUNE far detector.

  14. Fire safety design of a mobile quarantine facility

    NASA Technical Reports Server (NTRS)

    Bass, R. S.; Hirasaki, J. K.

    1971-01-01

    During the design phase of the Mobile Quarantine Facility (MQF), a primary consideration was fire safety. Therefore, appropriate criteria and ground rules were used in the design and construction of the facility. The fire codes and fire-requirement listings that are used by commerical airlines were supplied to the Manned Spacecraft Center (MSC) by the Federal Aviation Agency (FAA). After these codes were reviewed, a basic ground rule was adopted that flame protection for all combustible materials should be at least equivalent to or better than the standards for commercial aircraft. Because the MQF was designed to operate with an interior atmosphere of air rather than with an oxygen-enriched atmosphere such as that of the Apollo spacecraft cabin, the requirements for MQF material were not as stringent as those for the spacecraft.

  15. Design and Shielding of Radiotherapy Treatment Facilities; IPEM Report 75, 2nd Edition

    NASA Astrophysics Data System (ADS)

    Horton, Patrick; Eaton, David

    2017-07-01

    Design and Shielding of Radiotherapy Treatment Facilities provides readers with a single point of reference for protection advice to the construction and modification of radiotherapy facilities. The book assembles a faculty of national and international experts on all modalities including megavoltage and kilovoltage photons, brachytherapy and high-energy particles, and on conventional and Monte Carlo shielding calculations. This book is a comprehensive reference for qualified experts and radiation-shielding designers in radiation physics and also useful to anyone involved in the design of radiotherapy facilities.

  16. Lessons learned: clinicians' post-occupancy perspective of facility design involvement.

    PubMed

    Reno, Kathy; Okland, Kathy; Finis, Nanne; Lamantia, Gina; Call, Roger; Cardon, Kerrie; Gerber, Deborah; Zeigler, Janet

    2014-01-01

    The research was conducted to determine clinician knowledge needs for competent involvement with the facility design process as well as to gather lessons learned on building stronger design teams. As clinical stakeholders are invited to the healthcare facility design table, the question arises as to the ability of professionally diverse team members to translate each other's comments and ideas accurately. In the past, hospitals were designed by a handful of hospital leaders and architects. More recently, multiple players have become involved throughout the design and construction of new healthcare facilities. Clinical consultants from two international healthcare companies observed that many clinicians were unprepared to effectively translate their needs to the architectural community or to competently utilize architectural tools and documents. A qualitative, post-occupancy cross-case study was conducted to understand how clinicians could increase their competencies for successful involvement in facility design. Focus group interviews were held with teams from healthcare facilities occupying their new facility for more than 6 months and less than 2 years. Curriculum topics were validated and additional areas recommended based on the interviews. Open-ended questioins on lessons learned provided several new dimensions to the research. Although validating the curriculum was the initial intent, the feedback from the focus groups on lessons learned provided rich concepts for practice implications and further research on post-occupancy. Decision-making, design process, interdisciplinary, planning, post-occupancy.

  17. Materials and construction techniques for cryogenic wind tunnel facilities for instruction/research use

    NASA Technical Reports Server (NTRS)

    Morse, S. F.; Roper, A. T.

    1975-01-01

    The results of the cryogenic wind tunnel program conducted at NASA Langley Research Center are presented to provide a starting point for the design of an instructional/research wind tunnel facility. The advantages of the cryogenic concept are discussed, and operating envelopes for a representative facility are presented to indicate the range and mode of operation. Special attention is given to the design, construction and materials problems peculiar to cryogenic wind tunnels. The control system for operation of a cryogenic tunnel is considered, and a portion of a linearized mathematical model is developed for determining the tunnel dynamic characteristics.

  18. Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soli Khericha; Edwin Harvego; John Svoboda

    2012-01-01

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less

  19. Infection control in design and construction work.

    PubMed

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  20. Conceptual design of the National Ignition Facility

    NASA Astrophysics Data System (ADS)

    Paisner, Jeffrey A.; Boyes, John D.; Kumpan, Steven A.; Lowdermilk, W. Howard; Sorem, Michael S.

    1995-12-01

    The Secretary of the U.S. Department of Energy (DOE) commissioned a conceptual design report (CDR) for the National Ignition Facility (NIF) in January 1993 as part of a key decision zero (KD0), justification of mission need. Motivated by the progress to date by the inertial confinement fusion (ICF) program in meeting the Nova technical contract goals established by the National Academy of Sciences in 1989, the Secretary requested a design using a solid-state laser driver operating at the third harmonic (0.35 micrometer) of neodymium (Nd) glass. The participating ICF laboratories signed a memorandum of agreement in August 1993, and established a project organization, including a technical team from the Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Laboratory for Laser Energetics at the University of Rochester. Since then, we completed the NIF conceptual design, based on standard construction at a generic DOE defense program's site, and issued a 7,000-page, 27-volume CDR in May 1994. Over the course of the conceptual design study, several other key documents were generated, including a facilities requirements document, a conceptual design scope and plan, a target physics design document, a laser design cost basis document, a functional requirements document, an experimental plan for indirect drive ignition, and a preliminary hazards analysis (PHA) document. DOE used the PHA to categorize the NIF as a low-hazard, non-nuclear facility. On October 21, 1994 the Secretary of Energy issued a key decision one (KD1) for the NIF, which approved the project and authorized DOE to request Office of Management and Budget-approval for congressional line-item FY 1996 NIF funding for preliminary engineering design and for National Environmental Policy Act activities. In addition, the Secretary declared Livermore as the preferred site for constructing the NIF. In February 1995, the NIF Project was

  1. 40 CFR 60.540 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for the Rubber Tire Manufacturing Industry § 60.540 Applicability and designation of affected... each of the following affected facilities in rubber tire manufacturing plants that commence... cementing operation in rubber tire manufacturing plants that commenced construction, modification, or...

  2. The National Ignition Facility: alignment from construction to shot operations

    NASA Astrophysics Data System (ADS)

    Burkhart, S. C.; Bliss, E.; Di Nicola, P.; Kalantar, D.; Lowe-Webb, R.; McCarville, T.; Nelson, D.; Salmon, T.; Schindler, T.; Villanueva, J.; Wilhelmsen, K.

    2010-08-01

    The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.

  3. Value Engineering. "A Working Tool for Cost Control in the Design of Educational Facilities."

    ERIC Educational Resources Information Center

    Lawrence, Jerry

    Value Engineering (VE) is a cost optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. By using VE, the optimum value for every life cycle dollar spent on a facility is obtained by identifying not…

  4. Blue Origin Facility - Construction Progress

    NASA Image and Video Library

    2017-03-21

    Construction is progressing on Blue Origin's 750,000-square-foot facility being built at Exploration Park on NASA Kennedy Space Center property in Florida. Blue Origin will use the factory to manufacture its two-stage super-heavy-lift New Glenn launch vehicle and launch the vehicles from Space Launch Complex 46 at Cape Canaveral Air Force Station.

  5. Design and construction of the Discovery Channel Telescope enclosure

    NASA Astrophysics Data System (ADS)

    Marshall, Heather K.; Teran, Jose U.; Bond, Kevin

    2010-07-01

    The Discovery Channel Telescope (DCT) is a project of Lowell Observatory, undertaken with support from Discovery Communications, Inc., to design and construct a 4-meter class telescope and support facility on a site approximately 40 miles southeast of Flagstaff, Arizona. The Discovery Channel Telescope Enclosure was completed in November, 2009. The DCT Enclosure is an octagonal steel structure with insulated composite panel skin. The structure rotates on sixteen compliant bogie assemblies attached to the stationary facility. The shutter is composed of two independently actuated, bi-parting structures that provide a viewing aperture. To improve seeing, the skin is covered with adhesive aluminum foil tape and the enclosed observing area is passively ventilated via rollup doors. The observing area can also be actively ventilated using a downdraft fan, and there are provisions for upgrades to active air conditioning. The enclosure also includes operational equipment such as a bridge crane, personnel lift, and access platforms. This paper discusses some of the design trades as well as the construction challenges and lessons learned by the DCT Project, its designer M3 Engineering and Technology Corporation (M3), and its general contractor, Building and Engineering Contractors, Southwest (BEC Southwest).

  6. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  7. Fabulous Facilities: New Constructions and Renovations.

    ERIC Educational Resources Information Center

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  8. Establishment of Biosafety Level-3 (BSL-3) laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    PubMed Central

    Mourya, Devendra T.; Yadav, Pragya D.; Majumdar, Triparna Dutta; Chauhan, Devendra S.; Katoch, Vishwa Mohan

    2014-01-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process. PMID:25297350

  9. Establishment of Biosafety Level-3 (BSL-3) laboratory: important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting.

    PubMed

    Mourya, Devendra T; Yadav, Pragya D; Majumdar, Triparna Dutta; Chauhan, Devendra S; Katoch, Vishwa Mohan

    2014-08-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  10. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the basis of how well they: (a) Reflect the use of best available technology in design, construction...) Maximize use of existing facilities; (i) Provide personnel trained in oil spill prevention at critical...

  11. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the basis of how well they: (a) Reflect the use of best available technology in design, construction...) Maximize use of existing facilities; (i) Provide personnel trained in oil spill prevention at critical...

  12. Development of cloud-operating platform for detention facility design

    NASA Astrophysics Data System (ADS)

    Tun Lee, Kwan; Hung, Meng-Chiu; Tseng, Wei-Fan; Chan, Yi-Ping

    2017-04-01

    In the past 20 years, the population of Taiwan has accumulated in urban areas. The land development has changed the hydrological environment and resulted in the increase of surface runoff and shortened the time to peak discharge. The change of runoff characteristics increases the flood risk and reduces resilient ability of the city during flood. Considering that engineering measures may not be easy to implement in populated cities, detention facilities set on building basements have been proposed to compromise the increase of surface runoff resulting from development activities. In this study, a web-based operational platform has been developed to integrate the GIS technologies, hydrological analyses, as well as relevant regulations for the design of detention facilities. The design procedure embedded in the system includes a prior selection of type and size of the detention facility, integrated hydrological analysis for the developing site, and inspection of relevant regulations. After login the platform, designers can access the system database to retrieve road maps, land use coverages, and storm sewer information. Once the type, size, inlet, and outlet of the detention facility are assigned, the system can acquire the rainfall intensity-duration-frequency information from adjacent rain gauges to perform hydrological analyses for the developing site. The increase of the runoff volume due to the development and the reduction of the outflow peak through the construction of the detention facility can be estimated. The outflow peak at the target site is then checked with relevant regulations to confirm the suitability of the detention facility design. The proposed web-based platform can provide a concise layout of the detention facility and the drainageway of the developing site on a graphical interface. The design information can also be delivered directly through a web link to authorities for inspecting to simplify the complex administrative procedures.

  13. Safe design of healthcare facilities

    PubMed Central

    Reiling, J

    2006-01-01

    The physical environment has a significant impact on health and safety; however, hospitals have not been designed with the explicit goal of enhancing patient safety through facility design. In April 2002, St Joseph's Community Hospital of West Bend, a member of SynergyHealth, brought together leaders in healthcare and systems engineering to develop a set of safety‐driven facility design recommendations and principles that would guide the design of a new hospital facility focused on patient safety. By introducing safety‐driven innovations into the facility design process, environmental designers and healthcare leaders will be able to make significant contributions to patient safety. PMID:17142606

  14. Progress in Design and Construction of the Optical Communications Laser Laboratory

    NASA Technical Reports Server (NTRS)

    Wilson, K. E.; Britcliffe, M.; Golshan, N.

    1999-01-01

    The deployment of advanced hyperspectral imaging and other Earth sensing instruments on board Earth observing satellites is driving the demand for high-data-rate communications. Optical communications meet the required data rates with small, low mass, and low-power communications packages. JPL, as NASA's lead center in optical communications, plans to construct a 1-m Optical Communications Telescope Laboratory (OCTL) at its Table Mountain Facility (TMF) complex in the San Gabriel Mountains of Southern California. The design of the building has been completed, and the construction contractor has been selected. Ground breaking is expected to start at the beginning of the 1999 TMF construction season. A request for proposal (RFP) has been issued for the procurement of the telescope system. Prior to letting the RFP we conducted a request for information with industry for the telescope system. Several vendors responded favorably and provided information on key elements of the proposed design. These inputs were considered in developing the final requirements in the RFP. Keywords: Free space optical communications, lasercom, telescopes, ground stations, adaptive optics, astrometry, Table Mountain Facility

  15. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  16. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  17. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  18. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  19. 41 CFR 102-76.30 - What seismic safety standards must Federal agencies follow in the design and construction of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Design and Construction... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What seismic safety standards must Federal agencies follow in the design and construction of Federal facilities? 102-76.30...

  20. A stochastic discrete optimization model for designing container terminal facilities

    NASA Astrophysics Data System (ADS)

    Zukhruf, Febri; Frazila, Russ Bona; Burhani, Jzolanda Tsavalista

    2017-11-01

    As uncertainty essentially affect the total transportation cost, it remains important in the container terminal that incorporates several modes and transshipments process. This paper then presents a stochastic discrete optimization model for designing the container terminal, which involves the decision of facilities improvement action. The container terminal operation model is constructed by accounting the variation of demand and facilities performance. In addition, for illustrating the conflicting issue that practically raises in the terminal operation, the model also takes into account the possible increment delay of facilities due to the increasing number of equipment, especially the container truck. Those variations expectantly reflect the uncertainty issue in the container terminal operation. A Monte Carlo simulation is invoked to propagate the variations by following the observed distribution. The problem is constructed within the framework of the combinatorial optimization problem for investigating the optimal decision of facilities improvement. A new variant of glow-worm swarm optimization (GSO) is thus proposed for solving the optimization, which is rarely explored in the transportation field. The model applicability is tested by considering the actual characteristics of the container terminal.

  1. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2014-10-01 2014-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  2. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2011-10-01 2011-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  3. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2013-10-01 2013-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  4. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... application: (1) Provide its assessment of the environmental impact of the project as called for by section... 42 Public Health 1 2012-10-01 2012-10-01 false Facilities construction. 136.110 Section 136.110 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE...

  5. Design, Construction and Test of Cryogen-Free HTS Coil Structure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocker, H.; Anerella, M.; Gupta, R.

    2011-03-28

    This paper will describe design, construction and test results of a cryo-mechanical structure to study coils made with the second generation High Temperature Superconductor (HTS) for the Facility for Rare Isotope Beams (FRIB). A magnet comprised of HTS coils mounted in a vacuum vessel and conduction-cooled with Gifford-McMahon cycle cryocoolers is used to develop and refine design and construction techniques. The study of these techniques and their effect on operations provides a better understanding of the use of cryogen free magnets in future accelerator projects. A cryogen-free, superconducting HTS magnet possesses certain operational advantages over cryogenically cooled, low temperature superconductingmore » magnets.« less

  6. Construction alternatives for free-standing facilities.

    PubMed

    Brown, G

    1990-01-01

    Many hospitals are exploring free-standing facilities as an option for providing more efficient imaging services. Mr. Brown discusses the pros and cons of an emerging building technology, manufactured construction, in which building and site preparation are done simultaneously. He presents the criteria managers should use to make a knowledgeable decision.

  7. Wall finish selection in hospital design: a survey of facility managers.

    PubMed

    Lavy, Sarel; Dixit, Manish K

    2012-01-01

    This paper seeks to analyze healthcare facility managers' perceptions regarding the materials used for interior wall finishes and the criteria used to select them. It also examines differences in wall finish materials and the selection process in three major hospital spaces: emergency, surgery, and in-patient units. These findings are compared with healthcare designers' perceptions on similar issues, as currently documented in the literature. Hospital design and the materials used for hospital construction have a considerable effect on the environment and health of patients. A 2002 survey revealed which characteristics healthcare facility designers consider when selecting materials for healthcare facilities; however, no similar study has examined the views of facility managers on building finish selection. A 22-question survey questionnaire was distributed to 210 facility managers of metropolitan, for-profit hospitals in Texas; IRB approval was obtained. Respondents were asked to rank 10 interior wall finish materials and 11 selection criteria for wall finishes. Data from 48 complete questionnaires were analyzed using descriptive statistics and nonparametric statistical analysis methods. The study found no statistically significant differences in terms of wall finish materials or the characteristics for material selection in the three major spaces studied. It identified facility managers' four most-preferred wall finish materials and the five-most preferred characteristics, with a statistical confidence level of greater than 95%. The paper underscores the importance of incorporating all perspectives: facility designers and facility managers should work together toward achieving common organizational goals.

  8. Acoustics in Research Facilities--Control of Wanted and Unwanted Sound. Laboratory Design Notes.

    ERIC Educational Resources Information Center

    Newman, Robert B.

    Common and special acoustics problems are discussed in relation to the design and construction of research facilities. Following a brief examination of design criteria for the control of wanted and unwanted sound, the technology for achieving desired results is discussed. Emphasis is given to various design procedures and materials for the control…

  9. DESIGNING, CONSTRUCTING AND FINANCING FACILITIES FOR A COMMUNITY SCHOOL.

    ERIC Educational Resources Information Center

    BATES, GUY J.; AND OTHERS

    IN FLINT THE EFFECTIVENESS AND SCOPE OF COMMUNITY USE OF THE SCHOOL WAS DIRECTLY RELATED TO ITS FACILITIES AND THEIR AVAILABILITY. THUS THE CONCEPT OF A COMMUNITY SCHOOL PROGRAM HAD A PRONOUNCED EFFECT ON THE ARCHITECTURAL PLANNING OF ELEMENTARY SCHOOLS IN FLINT. FLINT'S FIRST COMMUNITY SCHOOL CONTAINED THE FOLLOWING FACILITIES NOT USUALLY FOUND…

  10. 49 CFR 37.45 - Construction and alteration of transportation facilities by private entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities by private entities. 37.45 Section 37.45 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.45 Construction and alteration of transportation facilities by private entities. In constructing and altering transit...

  11. A Guide for Planning and Construction of Public School Facilities in Georgia. School Food Service Facilities.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    It is the purpose of this guide to provide established, well-tested guidelines for planning and constructing food service facilities. These guidelines attempt to get the most efficient and economical operation from a school's food service facilities by providing pertinent information for expanding and remodeling existing facilities, as well as…

  12. Educational Facility Design and Project Based Learning: "The Real Connection"

    ERIC Educational Resources Information Center

    Schrader, David L.; Sole, John

    2009-01-01

    There is a case to be made for the integration of the Project Based Service Learning (PBSL) process and the design and construction of educational facilities. A growing body of research supports the notion that the formulaic educational system of the last hundred years may no longer serve the learning styles of new and future generations. Their…

  13. Design Criteria for Microbiological Facilities at Fort Detrick. Volume I: Introduction.

    ERIC Educational Resources Information Center

    Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div.

    Volume I of a two volume manual serves as an introduction to design criteria for microbiological facilities. It is addressed to management personnel responsible for planning, budgeting, and making policy decisions for construction or remodeling of microbiological research laboratories. This volume is also concerned with--(1) microbiological safety…

  14. 25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. CONSTRUCTION PROGRESS AERIAL VIEW OF WASTE CALCINING FACILITY TAKEN WHEN STRUCTURE WAS 99 PERCENT COMPLETE. INEEL PHOTO NUMBER NRTS-60-5409. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  15. Technical and design update in the AUBE French low-level radioactive waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marque, Y.

    1989-01-01

    Long-term industrial management of radioactive waste in France is carried out by the Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA). ANDRA is in charge of design, siting, construction, and operation of disposal centers. The solution selected in France for the disposal of low- and medium-level, short-lived radioactive waste is near-surface disposal in the earth using the principle of multiple barriers, in accordance with national safety rules and regulations, and based on operating experience from the Centre de Stockage de la Manche. Since the center's start-up in 1969, 400,000 m{sup 3} of waste have been disposed of. The Frenchmore » national program for waste management is proceeding with the construction of a second near-surface disposal, which is expected to be operational in 1991. It is located in the department of AUBE (from which its name derives), 100 miles southeast of Paris. The paper describes the criteria for siting and design of the AUBE disposal facility, design of the AUBE facility disposal module, and comparison with North Carolina and Pennsylvania disposal facility designs.« less

  16. Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Vliet, James A.

    2012-07-01

    During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facilitymore » consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific

  17. 38 CFR 18.423 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false New construction. 18.423... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... facility is readily accessible to and usable by handicapped persons, if the construction was commenced...

  18. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...

  19. 10 CFR 1040.73 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false New construction. 1040.73 Section 1040.73 Energy... § 1040.73 New construction. (a) Design and construction. Each facility or part of a facility constructed... the construction was commenced after the effective date of this subpart. (b) Alteration. Each facility...

  20. ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahlmeister, J E; Haberer, W V; Casey, D F

    1960-12-15

    The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less

  1. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  2. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  3. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  4. 45 CFR 84.23 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false New construction. 84.23 Section 84.23 Public... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  5. 43 CFR 17.218 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true New construction. 17.218 Section 17.218... construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or... of the facility is readily accessible to and usable by handicapped persons, if the construction was...

  6. The Testing Behind the Test Facility: the Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio, U.S.A. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, U.S.A. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent ongoing construction.

  7. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC?s Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA?s space exploration program. T he large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world?s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada?s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic de-sign and subsequent on-going construction.

  8. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hozman, Aron D.; Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA's space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 cu ft in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada's acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  9. Building better healthcare facilities through evidence-based design: breaking new ground at Vancouver Island Health Authority.

    PubMed

    Waldner, Howard; Johnson, Bart; Sadler, Blair

    2012-01-01

    Many of today's healthcare facilities were constructed at least 50 years ago, and a growing number have outlived their useful lives. Despite renovations and renewals, they often fall short of providing an appropriate care setting. Clinicians and staff develop a mixture of compromises and workarounds simply to make things function. Evidence-based design principles are often absent from new healthcare facilities, perhaps because of lack of awareness of the principles or because implementing them may fall foul of short-term and short-sighted budgetary decisions. In planning a new healthcare facility in 2008, the executive team at Vancouver Island Health Authority decided to adopt the evidence-based design approach. They conducted site visits to newly constructed hospitals across North America and beyond, to determine best practices in terms of design and construction. These engagements resulted in the implementation of 102 evidence-based design principles and attributes in Victoria's Royal Jubilee hospital, a 500-bed Patient Care Centre. This $350M project was completed on time and on budget, showing that using evidence need not result in delays or higher costs. To date, the results of the evidence-based design are promising, with accolades coming from patients, staff and clinical partners, and a number of immediate and practical benefits for patients, families and care teams alike. Copyright © 2012 Longwoods Publishing.

  10. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  11. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  12. The Utilization and Design of Physical Facilities for the Rehabilitation of Mentally Retarded. Final Project Report.

    ERIC Educational Resources Information Center

    Bair, Howard V.; Leland, Henry

    To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…

  13. Financing Educational Facility Construction: Prevailing Wage Litigation.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    This chapter presents an up-to-date analysis of prevailing state wage laws that affect educational facility construction or renovation and highlights relevant prevailing wage litigation in many states. Currently, 13 states have no prevailing wage laws for public works. The other 37 states and the District of Columbia do have prevailing wage laws…

  14. Facility design consideration for continuous mix production of class 1.3 propellant

    NASA Technical Reports Server (NTRS)

    Williamson, K. L.; Schirk, P. G.

    1994-01-01

    In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

  15. Laboratory Animal Facilities. Laboratory Design Notes.

    ERIC Educational Resources Information Center

    Jonas, Albert M.

    1965-01-01

    Design of laboratory animal facilities must be functional. Accordingly, the designer should be aware of the complex nature of animal research and specifically the type of animal research which will be conducted in a new facility. The building of animal-care facilities in research institutions requires special knowledge in laboratory animal…

  16. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... which will contribute to the preservation and enhancement of sites, structures, and objects of...-96-1, “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” 1987 Edition.... Owners may accomplish construction by using their own personnel and equipment provided the owners possess...

  17. 40 CFR 60.750 - Applicability, designation of affected facility, and delegation of authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards of Performance for Municipal Solid Waste Landfills § 60.750 Applicability, designation of affected facility, and delegation of authority. (a) The provisions of this subpart apply to each municipal solid waste landfill that commenced construction, reconstruction or modification on or after May 30, 1991...

  18. 40 CFR 60.750 - Applicability, designation of affected facility, and delegation of authority.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards of Performance for Municipal Solid Waste Landfills § 60.750 Applicability, designation of affected facility, and delegation of authority. (a) The provisions of this subpart apply to each municipal solid waste landfill that commenced construction, reconstruction or modification on or after May 30, 1991...

  19. Facility Management as Part of an Integrated Design of Civil Engineering Structures

    NASA Astrophysics Data System (ADS)

    Hyben, Ivan; Podmanický, Peter

    2014-11-01

    The present article deals about facility management, as still relatively young component of an integrated planning and design of buildings. Attention is focused on the area of the proposal, which can greatly affect to amount of future operating costs. Operational efficiency has been divided into individual components and satisfaction with the solution of buildings already constructed was assessed by workers, who are actually dedicated facility management in these organizations. The results were then assessed and evaluated through regression analysis. The aim of this paper is to determine to what extent is desired update project documentation of new buildings from the perspective of facility management.

  20. 7 CFR 3015.16 - Construction and facility improvement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction and facility improvement. 3015.16 Section 3015.16 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Bonding and Insurance...

  1. 40 CFR 60.32c - Designated facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Designated facilities. 60.32c Section 60.32c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Solid Waste Landfills § 60.32c Designated facilities. (a) The designated facility to which the...

  2. Sustainable Design Guidelines for the Construction of New Facilities and the Renovation of Existing Structures.

    ERIC Educational Resources Information Center

    Dorsey, Judy; L'Esperance, Clare

    This guide summarizes research conducted at Colorado's Poudre School District (PSD) to develop guidelines for the desired performance outcomes from employing sustainable educational facility design, and it suggests approaches for attaining them. The guide also provides case studies and references to further investigate opportunities on specific…

  3. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    PubMed

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  4. Construction bidding cost of KSC's space shuttle facilities

    NASA Technical Reports Server (NTRS)

    Brown, Joseph Andrew

    1977-01-01

    The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

  5. The Discovery Channel Telescope: Construction and Design Progress, June 2006

    NASA Astrophysics Data System (ADS)

    Bida, Thomas A.; Smith, B. W.; Millis, R. L.; Dunham, E. W.; Wiecha, O. M.; Marshall, H.

    2006-06-01

    The Discovery Channel Telescope (DCT) is a 4.2m telescope under construction in northern Arizona. The DCT is located at a new site near Happy Jack at 2361m elevation, which was selected following a lengthy site testing campaign that demonstrated median ground-level seeing of 0.84-arcsec FWHM. The DCT science mission includes targeted studies of astrophysical and solar system objects utilizing RC and Nasmyth-mounted imaging and spectroscopic instrumentation, and wide-field surveys of KBO’s, Centaurs, NEA’s, and other time-variable objects with a 2-degree FOV prime focus camera.The DCT facility enclosure and control building will be completed this year, including the supports for the telescope mount and dome, the major infrastructure for facility machinery, the instrument laboratory, control and computer rooms, and the auxiliary building for the mirror coating facility. Meanwhile, the 4.3m ULE meniscus primary mirror blank was completed at Corning, Inc., in October 2005, and the 2-3 year mirror figuring effort is due to begin June 2006. The primary mirror and its design support, and the preliminary integrated telescope mount model, were finite-element analyzed to optimize the design of the mirror and top-end support configurations. The prime focus camera design has been refined to achieve atmospheric dispersion-compensated 0.25-arcsec images at 1-degree field radius, from B to I-band, at reduced cost through simplification of glasses to standard types and utilization of spheres on all but two lens surfaces.The Discovery Channel Telescope is a project of the Lowell Observatory with major financial support from Discovery Communications, Inc. (DCI). DCI plans ongoing television programming featuring the construction of the telescope and the research ultimately conducted with the DCT. Lowell Observatory is actively seeking additional partners in the project; interested parties should contact R. L. Millis, Director.

  6. 24 CFR 8.22 - New construction-housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false New construction-housing facilities. 8.22 Section 8.22 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development NONDISCRIMINATION BASED ON HANDICAP IN FEDERALLY ASSISTED PROGRAMS AND ACTIVITIES OF...

  7. 40 CFR 60.30d - Designated facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Designated facilities. 60.30d Section... Acid Production Units § 60.30d Designated facilities. Sulfuric acid production units. The designated facility to which §§ 60.31d and 60.32d apply is each existing “sulfuric acid production unit” as defined in...

  8. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  9. 45 CFR 605.23 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false New construction. 605.23 Section 605.23 Public... Accessibility § 605.23 New construction. (a) Design and construction. Each facility or part of a facility... persons, if the construction was commenced after the effective date of this part. (b) Alteration. Each...

  10. 22 CFR 217.23 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  11. 22 CFR 217.23 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false New construction. 217.23 Section 217.23 Foreign... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 217.23 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  12. Ford Motor Company NDE facility shielding design.

    PubMed

    Metzger, Robert L; Van Riper, Kenneth A; Jones, Martin H

    2005-01-01

    Ford Motor Company proposed the construction of a large non-destructive evaluation laboratory for radiography of automotive power train components. The authors were commissioned to design the shielding and to survey the completed facility for compliance with radiation doses for occupationally and non-occupationally exposed personnel. The two X-ray sources are Varian Linatron 3000 accelerators operating at 9-11 MV. One performs computed tomography of automotive transmissions, while the other does real-time radiography of operating engines and transmissions. The shield thickness for the primary barrier and all secondary barriers were determined by point-kernel techniques. Point-kernel techniques did not work well for skyshine calculations and locations where multiple sources (e.g. tube head leakage and various scatter fields) impacted doses. Shielding for these areas was determined using transport calculations. A number of MCNP [Briesmeister, J. F. MCNPCA general Monte Carlo N-particle transport code version 4B. Los Alamos National Laboratory Manual (1997)] calculations focused on skyshine estimates and the office areas. Measurements on the operational facility confirmed the shielding calculations.

  13. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  14. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  15. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  16. Space Habitat, assembly and repair facility

    NASA Technical Reports Server (NTRS)

    Colangelo, Todd A.; Hoetger, Debora C.; Kuo, Addison C.; Lo, Michael C.; Marcus, Leland R.; Tran, Phillip P.; Tutt, Chris J.; Wassmuth, Chad M.; Wildgrube, Gregory M.

    1992-01-01

    Integrated Space Systems (ISS) has designed a Low Earth Orbit Assembly Facility for submission in the 1992 AIAA/LORAL Team Space Design Competition. This facility, the Space Habitat, Assembly, and Repair Center (SHARC), will be used to construct, assemble, and service space vehicles. SHARC's primary mission will be the construction of interplanetary vehicles, but it will also be able to perform repair and refueling operations of craft which are in an Earth orbit. This facility has been designed using only present and near-present technology. The emphasis is on minimizing cost.

  17. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2014-10-01 2014-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  18. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2013-10-01 2013-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  19. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2012-10-01 2012-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  20. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CHILD CARE AND DEVELOPMENT FUND Indian Tribes § 98.84 Construction and renovation of child care... 45 Public Welfare 1 2011-10-01 2011-10-01 false Construction and renovation of child care... child care facilities (including paying the cost of amortizing the principal and paying interest on...

  1. 45 CFR 1232.15 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...

  2. 45 CFR 1232.15 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...

  3. 45 CFR 1232.15 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false New construction. 1232.15 Section 1232.15 Public... Accessibility § 1232.15 New construction. (a) Design, construction, and alteration. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. construction shall...

  4. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  5. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  6. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  7. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  8. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  9. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  10. 7 CFR 15b.19 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  11. 7 CFR 15b.19 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false New construction. 15b.19 Section 15b.19 Agriculture... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Accessibility § 15b.19 New construction. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a recipient...

  12. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  13. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  14. 77 FR 1780 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... development--design and construction. Site utilities--design and construction. Stormwater facilities--design and construction. Airside/apron--design and construction. Landside/roadway--design and construction. General aviation terminal/apron--design and construction. Airport beacon relocation--design and...

  15. Environmental Projects. Volume 9: Construction of hazardous materials storage facilities

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of seven parabolic dish antennas. These activities may give rise to environmental hazards. This report is one in a series of reports describing environmental projects at GDSCC. The construction of two hazardous materials and wastes storage facilities and an acid-wash facility is described. An overview of the Goldstone complex is also presented along with a description of the environmental aspects of the GDSCC site.

  16. 14 CFR § 1251.302 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF HANDICAP Accessibility § 1251.302 New construction. (a) Design and construction. Each facility or... handicapped persons, if the construction (ground breaking) was commenced after the effective date of this part... manner that the altered portion of the facility is readily accessible to and usable by handicapped...

  17. 40 CFR 7.70 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...

  18. 40 CFR 7.70 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...

  19. 40 CFR 7.70 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...

  20. 40 CFR 7.70 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...

  1. 40 CFR 7.70 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.70 New construction. (a) General. New facilities shall be designed and constructed to be readily accessible to and usable by handicapped persons. Alterations to existing facilities shall...

  2. Construction continues on the RLV complex at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, a worker takes a measurement. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  3. Construction continues on the RLV complex at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Construction is under way for the X-33/X-34 hangar complex near the Shuttle Landing Facility at KSC. The Reusable Launch Vehicle (RLV) complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  4. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  5. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  6. Aerial views of construction on the RLV hangar at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Looking southwest, this view shows ongoing construction of a multi-purpose hangar, which is part of the $8 million Reusable Launch Vehicle (RLV) Support Complex at Kennedy Space Center. Edging the construction is Sharkey Road, which parallels the landing strip of the Shuttle Landing Facility nearby. The RLV complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  7. 28 CFR 42.522 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 42.522 Section 42.522... Section 504 of the Rehabilitation Act of 1973 Accessibility § 42.522 New construction. (a) Design and construction. Each new facility constructed by, on behalf of, or for the use of a recipient shall be designed...

  8. 40 CFR 62.14352 - Designated facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not... facility to which this subpart applies is each municipal solid waste landfill in all States, protectorates... for landfills exempted by paragraphs (b) and (c) of this section. (1) The municipal solid waste...

  9. 40 CFR 62.14352 - Designated facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not... facility to which this subpart applies is each municipal solid waste landfill in all States, protectorates... for landfills exempted by paragraphs (b) and (c) of this section. (1) The municipal solid waste...

  10. Optimal capacity design of LID facility for conserving natural water cycle and its sensitivity analysis

    NASA Astrophysics Data System (ADS)

    Lee, O.; Choi, J.; Lee, J.; Kim, S.

    2017-12-01

    Since the 20th century, urbanization has resulted in increased impermeable land surface and reduced infiltration capacity in catchment scale. Especially, when agriculture area or forest area would be developed into urban area, it can cause more runoff in the same climate condition. Such urbanization causes problems such as changes in hydrological cycle and ecosystem disturbance. Various methods have been proposed worldwide to reduce the impact of such urbanization. Among the various strategies, the low-impact development is a development strategy that aims to return to pre-development state by minimizing the change of the hydrological cycle due to urbanization. In this strategy, the infiltration and/or surface storage of stormwater runoff can be increased through the installation of various facilities. In this study, a facility capacity design strategy is proposed to return into the natural water cycle through the installation of various LID facilities. This is accomplished by determining the optimal LID facility design capacity through which flow duration curves remain the same before and after urban development. For this purpose, EPA-SWMM is constructed with a part of Busan Metropolitan City Noksan Industrial Complex as a virtual processing area. Under the various land-use scenarios, the optimum design capacity of various LID facilities capable of retaining the flow duration curve before and after development is determined. In addition, the sensitivity of the optimal design capacity of LID facilities is analyzed according to the design specifications of various LID facilities, the local rainfall characteristics, and the size of the treatment area. Acknowledgement This research was supported by a grant (2016000200002) from Public Welfare Technology Development Program funded by Ministry of Environment of Korean government.

  11. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  12. Virtual Walk: The Construction of the Long Baseline Neutrino Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This 2-minute animation shows a virtual walk through the large caverns of the Long-Baseline Neutrino Facility, which will house the Deep Underground Neutrino Experiment. To create the caverns for the huge DUNE particle detectors, construction crews will excavate more than 800,000 tons of rock a mile underground at the Sanford Underground Research Facility in South Dakota. Scientists and dignitaries broke ground for this project on July 21, 2017. When construction is complete, DUNE scientists will send an intense neutrino beam through 1,300 kilometers of rock from the Department of Energy’s Fermilab to the DUNE particle detectors to understand the rolemore » that neutrinos – the most abundant matter particles in the universe – play in our cosmos. About 1,000 scientists from more than 160 institutions in 30 countries work on the Deep Underground Neutrino Experiment.« less

  13. 78 FR 10110 - Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way; Shared Use Paths

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... guidelines would apply to the design, construction, and alteration of pedestrian facilities in the public... guidelines for the design, construction, and alteration of facilities covered by the Americans with... required to adopt accessibility standards for the design, construction, and alteration of facilities...

  14. Construction continues on the RLV complex at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, workers take measurements for one of the buildings. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  15. Overview of the Preliminary Design of the Optical Communication Demonstration and High-Rate Link Facility

    NASA Technical Reports Server (NTRS)

    Sandusky, John V.; Jeganathan, M.; Ortiz, G.; Biswas, A.; Lee, S.; Parker, G.; Liu, B.; Johnson, D.; DePew, J.; Lesh, J. R.

    2000-01-01

    Tlis paper presents an overview of the preliminary design of both the flight and ground systems of the Optical Communication Demonstration and High-Rate Link Facility which will demonstrate optical communication from the International Space Station to ground after its deployment in October 2002. The overview of the preliminary design of the Flight System proceeds by contrasting it with the design of the laboratory-model unit, emphasizing key changes and the rationale behind the design choices. After presenting the preliminary design of the Ground System, the timetable for the construction and deployment of the flight and ground systems is outlined.

  16. The Abbott School Construction Program: NJ Department of Education Proposed Facilities Regulations. Analysis of Preschool Issues

    ERIC Educational Resources Information Center

    Ponessa, Joan; Boylan, Ellen

    2004-01-01

    This report on preschool facilities analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State Supreme Court's…

  17. State and Federal Policies for School Facility Construction: A Comparison of Michigan and Ohio

    ERIC Educational Resources Information Center

    Davis, Thomas E.

    2015-01-01

    Background: The Ohio School Facilities Commission was set up in response to litigation compelling the state to achieve a more equitable distribution in the quality of school facilities. The American Recovery and Reinvestment Act (ARRA) was a federal policy to stimulate the United States economy and support school facility construction. These two…

  18. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12124. Unknown Photographer, 9/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  19. Gene composer: database software for protein construct design, codon engineering, and gene synthesis.

    PubMed

    Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance

    2009-04-21

    To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis-match specific endonuclease

  20. Gene Composer: database software for protein construct design, codon engineering, and gene synthesis

    PubMed Central

    Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance

    2009-01-01

    Background To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. Results An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. Conclusion We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis

  1. Strategies for healthcare facilities, construction, and real estate management.

    PubMed

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  2. Design, construction, and testing of a high altitude research glider

    NASA Astrophysics Data System (ADS)

    Parker, Trevor Llewellyn

    Micro aerial vehicle development and atmospheric flight on Mars are areas that require research in very low Reynolds number flight. Facilities for studying these problems are not widely available. The upper atmosphere of the Earth, approximately 100,000 feet AGL, is readily available and closely resembles the atmosphere on Mars, in both temperature and density. This low density also allows normal size test geometry with a very low Reynolds number. This solves a problem in micro aerial vehicle development; it can be very difficult to manufacture instrumented test apparatus in the small sizes required for conventional testing. This thesis documents the design, construction, and testing of a glider designed to be released from a weather balloon at 100,000 feet AGL and operate in this environment, collecting airfoil and aircraft performance data. The challenges of designing a vehicle to operate in a low Reynolds number, low temperature environment are addressed.

  3. Facile one-step construction of covalently networked, self-healable, and transparent superhydrophobic composite films

    NASA Astrophysics Data System (ADS)

    Lee, Yujin; You, Eun-Ah; Ha, Young-Geun

    2018-07-01

    Despite the considerable demand for bioinspired superhydrophobic surfaces with highly transparent, self-cleaning, and self-healable properties, a facile and scalable fabrication method for multifunctional superhydrophobic films with strong chemical networks has rarely been established. Here, we report a rationally designed facile one-step construction of covalently networked, transparent, self-cleaning, and self-healable superhydrophobic films via a one-step preparation and single-reaction process of multi-components. As coating materials for achieving the one-step fabrication of multifunctional superhydrophobic films, we included two different sizes of Al2O3 nanoparticles for hierarchical micro/nano dual-scale structures and transparent films, fluoroalkylsilane for both low surface energy and covalent binding functions, and aluminum nitrate for aluminum oxide networked films. On the basis of stability tests for the robust film composition, the optimized, covalently linked superhydrophobic composite films with a high water contact angle (>160°) and low sliding angle (<1°) showed excellent thermal stability (up to 400 °C), transparency (≈80%), self-healing, self-cleaning, and waterproof abilities. Therefore, the rationally designed, covalently networked superhydrophobic composite films, fabricated via a one-step solution-based process, can be further utilized for various optical and optoelectronic applications.

  4. REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    REACTIVITY MEASUREMENT FACILITY, UNDER CONSTRUCTION OVER MTR CANAL IN BASEMENT OF MTR BUILDING, TRA-603. WOOD PLANKS REST ON CANAL WALL OBSERVABLE IN FOREGROUND. INL NEGATIVE NO. 11745. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  5. Capabilities, Design, Construction and Commissioning of New Vibration, Acoustic, and Electromagnetic Capabilities Added to the World's Largest Thermal Vacuum Chamber at NASA's Space Power Facility

    NASA Technical Reports Server (NTRS)

    Motil, Susan M.; Ludwiczak, Damian R.; Carek, Gerald A.; Sorge, Richard N.; Free, James M.; Cikanek, Harry A., III

    2011-01-01

    NASA s human space exploration plans developed under the Exploration System Architecture Studies in 2005 included a Crew Exploration Vehicle launched on an Ares I launch vehicle. The mass of the Crew Exploration Vehicle and trajectory of the Ares I coupled with the need to be able to abort across a large percentage of the trajectory generated unprecedented testing requirements. A future lunar lander added to projected test requirements. In 2006, the basic test plan for Orion was developed. It included several types of environment tests typical of spacecraft development programs. These included thermal-vacuum, electromagnetic interference, mechanical vibration, and acoustic tests. Because of the size of the vehicle and unprecedented acoustics, NASA conducted an extensive assessment of options for testing, and as result, chose to augment the Space Power Facility at NASA Plum Brook Station, of the John H. Glenn Research Center to provide the needed test capabilities. The augmentation included designing and building the World s highest mass capable vibration table, the highest power large acoustic chamber, and adaptation of the existing World s largest thermal vacuum chamber as a reverberant electromagnetic interference test chamber. These augmentations were accomplished from 2007 through early 2011. Acceptance testing began in Spring 2011 and will be completed in the Fall of 2011. This paper provides an overview of the capabilities, design, construction and acceptance of this extraordinary facility.

  6. Zeitgeists and development trends in long-term care facility design.

    PubMed

    Wang, Chia-Hui; Kuo, Nai-Wen

    2006-06-01

    Through literature analysis, in-depth interviews, and the application of the Delphi survey, this study explored long-term care resident priorities with regard to long-term care facility design in terms of both physical and psychological needs. This study further clarified changing trends in long-term care concepts; illustrated the impact that such changes are having on long-term care facility design; and summarized zeitgeists related to the architectural design of long-term care facilities. Results of our Delphi survey indicated the following top five priorities in long-term care facility design: (1) creating a home-like feeling; (2) adhering to Universal Design concepts; (3) providing well-defined private sleeping areas; (4) providing adequate social space; and (5) decentralizing residents' rooms into clusters. The three major zeitgeists related to long-term care facility design include: (1) modern long-term care facilities should abandon their traditional "hospital" image and gradually reposition facilities into homelike settings; (2) institution-based care for the elderly should be de-institutionalized under the concept of aging-in-place; and (3) living clusters, rather than traditional hospital-like wards, should be designed into long-term care facilities.

  7. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627). INL PHOTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12573. R.G. Larsen, Photographer, 10/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  8. Lunar base launch and landing facilities conceptual design

    NASA Technical Reports Server (NTRS)

    Phillips, Paul G.; Simonds, Charles H.; Stump, William R.

    1992-01-01

    The purpose of this study was to perform a first look at the requirements for launch and landing facilities for early lunar bases and to prepared conceptual designs for some of these facilities. The emphasis of the study is on the facilities needed from the first manned landing until permanent occupancy, the Phase 2 lunar base. Factors including surface characteristics, navigation system, engine blast effects, and expected surface operations are used to develop landing pad designs, and definitions fo various other elements of the launch and landing facilities. Finally, the dependence of the use of these elements and the evolution of the facilities are established.

  9. 24 CFR 941.203 - Design and construction standards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Design and construction standards... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT PHA Eligibility and Program Requirements § 941.203 Design and construction standards. (a) Physical structures shall be designed, constructed and equipped so as...

  10. The trajectories of Prevention through Design in construction.

    PubMed

    Toole, T Michael; Gambatese, John

    2008-01-01

    Construction Hazards Prevention through Design (CHPtD) is a process in which engineers and architects explicitly consider the safety of construction workers during the design process. Although articles on CHPtD have appeared in top construction journals, the literature has not addressed technical principles underlying CHPtD to help designers better perform CHPtD, to facilitate the development of additional CHPtD tools, and to predict the future path of CHPtD. This theoretical paper uses the existing literature on CHPtD and current action research associated with several CHPtD workgroups to analyze how CHPtD will likely evolve over the coming decades. There are four trajectories along which CHPtD will progress. (a) Designs will increasingly facilitate prefabricated construction; (b) designers will increasingly choose materials and systems that are inherently safer than alternatives; (c) designers will increasingly perform construction engineering; and (d) designers will increasingly apply spatial considerations to reduce worker hazards. By understanding how CHPtD may be manifested in the engineering-procurement-construction (EPC) industry, practitioners can better prepare for adopting CHPtD within their organizations and construction and engineering educators can better prepare their graduates to perform CHPtD.

  11. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING INITIAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING INITIAL EXCAVATION. INL PHOTO NUMBER NRTS-54-10703. Unknown Photographer, 5/21/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  12. The interaction of facility design with management goals.

    PubMed

    Lindeman, W E

    1991-01-01

    While medical groups have different goals based on their mission, size and market, they all seek to propagate and maintain a financially sound enterprise. Author William Lindeman, AIA, writes that a primary factor in achieving this goal is excellent facility design. While facility design is no guarantee for success, exceptionally poor design can make success all but impossible.

  13. Design of Aircraft Deicing Facilities

    DOT National Transportation Integrated Search

    1993-08-23

    Archival copy of original Federal Aviation Administration standards and : specifications for use in the design of aircraft deicing facilities. To ensure : review of all changes, user should consult . ...

  14. Tribal Child Care Facilities: A Guide to Construction and Renovation

    ERIC Educational Resources Information Center

    US Department of Health and Human Services, 2006

    2006-01-01

    The Personal Responsibility and Work Opportunity Reconciliation Act of 1996 allowed Tribes to use Child Care and Development Fund (CCDF) monies for the construction or renovation of child care facilities. As procedures have been implemented over the years, Tribes and Administration for Children and Families (ACF) Regional Offices have identified a…

  15. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  16. Public Law 94-103: 94th Congress, H.R. 4005, October 4, 1975. An Act to Amend the Developmental Disabilities Services and Facilities Construction Act to Revise and Extend the Programs Authorized by that Act.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate.

    Presented is the 1975 amendment to the Developmental Disabilities Services and Facilities Construction Act. Described are revisions and extensions of the earlier act, including revision of grant and construction assistance for university affiliated facilities, and revision of special projects assistance. The earlier act's designation of rights of…

  17. A Design for an Orbital Assembly Facility for Complex Missions

    NASA Astrophysics Data System (ADS)

    Feast, S.; Bond, A.

    A design is presented for an Operations Base Station (OBS) in low earth orbit that will function as an integral part of a space transportation system, enabling assembly and maintenance of a Cis-Lunar transportation infrastructure and integration of vehicles for other high energy space missions to be carried out. Construction of the OBS assumes the use of the SKYLON Single-Stage-to-Orbit (SSTO) spaceplane, which imposes design and assembly constraints due to its payload mass limits and payload bay dimensions. It is assumed that the space transport infrastructure and high mission energy vehicles would also make use of SKYLON to deploy standard transport equipment and stages bound by these same constraints. The OBS is therefore a highly modular arrangement, incorporating some of these other vehicle system elements in its layout design. Architecturally, the facilities of the OBS are centred around the Assembly Dock which is in the form of a large cylindrical spaceframe structure with two large doors on either end incorporating a skin of aluminised Mylar to enclose the dock. Longitudinal rails provide internal tether attachments to anchor vehicles and components while manipulators are used for the handling and assembling of vehicle structures. The exterior of the OBS houses the habitation modules for workforce and vehicle crews along with propellant farms and other operational facilities.

  18. JPL Facilities and Software for Collaborative Design: 1994 - Present

    NASA Technical Reports Server (NTRS)

    DeFlorio, Paul A.

    2004-01-01

    The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

  19. Design Standards for School Art Facilities

    ERIC Educational Resources Information Center

    National Art Education Association, 2015

    2015-01-01

    "Design Standards for School Art Facilities" is an invaluable resource for any school or school district looking to build new facilities for the visual arts or renovate existing ones. Discover detailed information about spaces for the breadth of media used in the visual arts. Photographs illustrate all types of features including…

  20. CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING PLACEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING PLACEMENT OF PIERS. INL PHOTO NUMBER NRTS-54-11716. Unknown Photographer, 8/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  1. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  2. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  3. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  4. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  5. CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP627) SHOWING EMPLACEMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING EMPLACEMENT OF ROOF SLABS. INL PHOTO NUMBER NRTS-54-13463. R.G. Larsen, Photographer, 12/20/1954 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  6. 46 CFR 108.235 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  7. 46 CFR 108.235 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  8. 46 CFR 108.235 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  9. Facilities for music education and their acoustical design.

    PubMed

    Koskinen, Heli; Toppila, Esko; Olkinuora, Pekka

    2010-01-01

    Good rehearsal facilities for musicians are essential. Directive 2003/10/EC necessitates that musicians are protected from noise exposure. A code of conduct gives the guidelines how this should be done. This study examines room acoustics recommendations provided by the Finnish code of conduct, and discusses whether they are adequate. Small teaching facilities were measured after renovation and compared to earlier measurements. Teachers' opinions were inquired about the facilities before and after. The renovation did not decrease the noise exposure of the teachers. However, the majority preferred the facilities after the renovation. The Finnish code of conduct is not sufficient for facilities where loud instruments are played, or band practise. Good facilities can be designed but they must be specified at the designing stage for their intended use.

  10. 18 CFR 2.13 - Design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Design and construction... Interpretations Under the Federal Power Act § 2.13 Design and construction. (a) The Commission recognizes the... for the Protection of Natural, Historic, Scenic, and Recreational Values in the Design and Location of...

  11. FAST FLUX TEST FACILITY CONCEPTUAL FACILTY DESIGN DESCRIPTION FOR THE INERT GAS CELL EXAMINATION FACILITY NO. 71

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1968-12-12

    The purpose of this Conceptual Facility Design Description (CFDD) is to provide a technical description of the Inert Gas Cell Examination Facility such that agreement with RDT on a Conceptual Design can be reached . The CFDD also serves to establish a common understanding of the facility concept among all responsible FFTF Project parties including the Architect Engineer and Reactor Designer. Included are functions and design requirements, a physical description of the facility, safety considerations, principles of operation, and maintenance principles.

  12. In-situ resource utilization in the design of advanced lunar facilities

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Resource utilization will play an important role in the establishment and support of a permanently manned lunar base. At the University of Houston - College of Architecture and the Sasakawa International Center for Space Architecture, a study team recently investigated the potential use of lunar in-situ materials in the design of lunar facilities. The team identified seven potential lunar construction materials; concrete, sulfur concrete, cast basalt, sintered basalt, glass, fiberglass, and metals. Analysis and evaluation of these materials with respect to their physical properties, processes, energy requirements, resource efficiency, and overall advantages and disadvantages lead to the selection of basalt materials as the more likely construction material for initial use on a lunar base. Basalt materials can be formed out of in-situ lunar regolith, with minor material beneficiation, by a simple process of heating and controlled cooling. The team then conceptualized a construction system that combines lunar regolith sintering and casting to make pressurized structures out of lunar resources. The design uses a machine that simultaneously excavates and sinters the lunar regolith to create a cylindrical hole, which is then enclosed with cast basalt slabs, allowing the volume to be pressurized for use as a living or work environment. Cylinder depths of up to 4 to 6 m in the lunar mare or 10 to 12 m in the lunar highlands are possible. Advantages of this construction system include maximum resource utilization, relatively large habitable volumes, interior flexibility, and minimal construction equipment needs. Conclusions of this study indicate that there is significant potential for the use of basalt, a lunar resource derived construction material, as a low cost alternative to Earth-based materials. It remains to be determined when in lunar base phasing this construction method should be implemented.

  13. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  14. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  15. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  16. Modern tornado design of nuclear and other potentially hazardous facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevenson, J.D.; Zhao, Y.

    Tornado wind loads and other tornado phenomena, including tornado missiles and differential pressure effects, have not usually been considered in the design of conventional industrial, commercial, or residential facilities in the United States; however, tornado resistance has often become a design requirement for certain hazardous facilities, such as large nuclear power plants and nuclear materials and waste storage facilities, as well as large liquefied natural gas storage facilities. This article provides a review of current procedures for the design of hazardous industrial facilities to resist tornado effects. 23 refs., 19 figs., 13 tabs.

  17. The National Ignition Facility and Industry

    NASA Astrophysics Data System (ADS)

    Harri, J. G.; Paisner, J. A.; Lowdermilk, W. H.; Boyes, J. D.; Kumpan, S. A.; Sorem, M. S.

    1994-09-01

    The mission of the National Ignition Facility is to achieve ignition and gain in inertial confinement fusion targets in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects testing, and for civilian applications such as fusion energy development and fundamental studies of matter at high temperatures and densities. The National Ignition Facility construction project will require the best of our construction industries and its success will depend on the best products offered by hundreds of the nation's high technology companies. Three-fourths of the construction costs will be invested in industry. This article reviews the design, cost and schedule, and required industrial involvement associated with the construction project.

  18. 24 CFR 242.44 - Construction standards.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...

  19. 24 CFR 242.44 - Construction standards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...

  20. 24 CFR 242.44 - Construction standards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Construction standards. 242.44... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.44 Construction standards. Work designed and performed... “Guidelines for Construction and Equipment of Hospital and Medical Facilities,” which is regularly updated and...

  1. Yucca Mountain Project Subsurface Facilities Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    A. Linden; R.S. Saunders; R.J. Boutin

    2002-11-19

    Four units of the Topopah Springs formation (volcanic tuff) are considered for the proposed repository: the upper lithophysal, the middle non-lithophysal, the lower lithophysal, and the lower non-lithophysal. Yucca Mountain was recently designated the site for a proposed repository to dispose of spent nuclear fuel and high-level radioactive waste. Work is proceeding to advance the design of subsurface facilities to accommodate emplacing waste packages in the proposed repository. This paper summarized recent progress in the design of subsurface layout of the proposed repository. The original Site Recommendation (SR) concept for the subsurface design located the repository largely within the lowermore » lithophysal zone (approximately 73%) of the Topopah The Site Recommendation characterized area suitable for emplacement consisted of the primary upper block, the lower block and the southern upper block extension. The primary upper block accommodated the mandated 70,000 metric tons of heavy metal (MTHM) at a 1.45 kW/m hear heat load. Based on further study of the Site Recommendation concept, the proposed repository siting area footprint was modified to make maximum use of available site characterization data, and thus, reduce uncertainties associated with performance assessment. As a result of this study, a modified repository footprint has been proposed and is presently being review for acceptance by the DOE. A panel design concept was developed to reduce overall costs and reduce the overall emplacement schedule. This concept provides flexibility to adjust the proposed repository subsurface layout with time, as it makes it unnecessary to ''commit'' to development of a large single panel at the earliest stages of construction. A description of the underground layout configuration and influencing factors that affect the layout configuration are discussed in the report.« less

  2. Design update and recent results of the Apollon 10 PW facility

    NASA Astrophysics Data System (ADS)

    Le Garrec, B.; Papadopoulos, D. N.; Le Blanc, C.; Zou, J. P.; Chériaux, G.; Georges, P.; Druon, F.; Martin, L.; Fréneaux, L.; Beluze, A.; Lebas, N.; Mathieu, F.; Audebert, P.

    2017-05-01

    In this paper we are giving a summary of the Apollon 10 PW facility laser design together with updated laser performance. The Apollon facility is currently under construction in France. The APOLLON laser system is a laser designed for delivering pulses as short as 15 fs (10-15 s) with an energy exceeding 150 Joules on target. The peak power delivered by this laser system will be 10 Petawatts (1016W). The Apollon laser system will be delivering 4 beams: one 10 PW beam (F1 beam 400 mm diameter), one 1 PW beam (F2 beam 140 mm diameter) and two additional probe beams (F3 and F4) at a repetition rate of 1 shot per minute. The laser system is based on Ti-sapphire amplifiers pumped by frequency doubled solid-state lasers. The repetition rate of the high energy part will be 1 shot per minute. The main beam at the output of the last amplifier will be split and dispatched to two experimental areas. The main laser beam is delivering 30 J before compression at a repetition rate of 1 shot per minute and we are currently increasing to get 100J.

  3. The use of methods of structural optimization at the stage of designing high-rise buildings with steel construction

    NASA Astrophysics Data System (ADS)

    Vasilkin, Andrey

    2018-03-01

    The more designing solutions at the search stage for design for high-rise buildings can be synthesized by the engineer, the more likely that the final adopted version will be the most efficient and economical. However, in modern market conditions, taking into account the complexity and responsibility of high-rise buildings the designer does not have the necessary time to develop, analyze and compare any significant number of options. To solve this problem, it is expedient to use the high potential of computer-aided designing. To implement automated search for design solutions, it is proposed to develop the computing facilities, the application of which will significantly increase the productivity of the designer and reduce the complexity of designing. Methods of structural and parametric optimization have been adopted as the basis of the computing facilities. Their efficiency in the synthesis of design solutions is shown, also the schemes, that illustrate and explain the introduction of structural optimization in the traditional design of steel frames, are constructed. To solve the problem of synthesis and comparison of design solutions for steel frames, it is proposed to develop the computing facilities that significantly reduces the complexity of search designing and based on the use of methods of structural and parametric optimization.

  4. Design & layout of recreation facilities

    Treesearch

    Howard R. Orr

    1971-01-01

    Design and layout of recreation facilities is a problem solving process that must be divorced from the emotionalism that has shrouded outdoor recreation and must deal deliberately with the growing information concerning people and natural resources.

  5. 45 CFR 98.84 - Construction and renovation of child care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... services, quality activities, or administrative costs). (h) A construction or renovation project that... facilities. 98.84 Section 98.84 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... child care services provided by the Tribal Lead Agency as compared to the level of services provided by...

  6. Facility Programming and Construction Criteria [Planning Guide]. 702 KAR 4:170.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Div. of Facilities Management.

    This facility construction planning guide presents the minimum instructional space standards for Kentucky's public school system. It provides definitions of terms found in the regulations; presents space requirements for every type of instructional space within a public school, including circulation areas, storage, and mechanical/electrical areas;…

  7. Production Facility SCADA Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale, Gregory E.; Holloway, Michael Andrew; Baily, Scott A.

    2015-03-23

    The following report covers FY 14 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production facility. The goal of this effort is to provide Northstar with a baseline system design.

  8. Ohio School Design Manual.

    ERIC Educational Resources Information Center

    Ohio School Facilities Commission, Columbus.

    This manual presents guidance to facility designers, school administrators, staff, and students for the development of school facilities being constructed under Ohio's Classroom Facilities Assistance Program. It provides critical analysis of individual spaces and material/system components necessary for the construction of elementary and secondary…

  9. Preliminary design for a maglev development facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coffey, H.T.; He, J.L.; Chang, S.L.

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable ofmore » powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.« less

  10. Integration, design, and construction of a CELSS breadboard facility for bioregenerative life support system research

    NASA Technical Reports Server (NTRS)

    Prince, R.; Knott, W.; Buchanan, Paul

    1987-01-01

    Design criteria for the Biomass Production Chamber (BPC), preliminary operating procedures, and requirements for the future development of the Controlled Ecological Life Support System (CELSS) are discussed. CELSS, which uses a bioregenerative system, includes the following three major units: (1) a biomass production component to grow plants under controlled conditions; (2) food processing components to derive maximum edible content from all plant parts; and (3) waste management components to recover and recycle all solids, liquids, and gases necessary to support life. The current status of the CELSS breadboard facility is reviewed; a block diagram of a simplified version of CELSS and schematic diagrams of the BPS are included.

  11. 75 FR 36117 - No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee-Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... visit; Brief update on school facilities FY11 budget; Review any language drafted by Committee members... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs No Child Left Behind School Facilities and... of Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction...

  12. Designing Decentralized Water and Electricity Supply System for Small Recreational Facilities in the South of Russia

    NASA Astrophysics Data System (ADS)

    Kasharin, D. V.

    2017-11-01

    The article tackles the issues of designing seasonal water and power supply systems for small recreational facilities in the south of Russia based on intelligent decision support systems. The paper proposes modular prefabricated shell water and power supply works (MPSW&PW) along with energy-efficient standalone water-treatment plants as the principal facilities compliant with the environmental and infrastructural requirements applied to specially protected areas and ensuring the least possible damage to the environment due to a maximum possible use of local construction materials characterized by impressive safety margins in highly seismic environments. The task of designing water and power supply systems requires the consideration of issues pertaining to the development of an intelligent GIS-based system for the selection of water intake sites that facilitate automation of data-processing systems using a priori scanning methods with a variable step and random directions. The paper duly addresses such issues and develops parameterized optimization algorithms for MPSW&PW shell facilities. It equally provides the substantiation of water-treatment plants intelligent design based on energy recovery reverse osmosis and nanofiltration plants that enhance the energy efficiency of such plants serving as the optimum solution for the decentralized water supply of small recreational facilities from renewable energy sources.

  13. Preliminary design study for an atomospheric science facility

    NASA Technical Reports Server (NTRS)

    Hutchison, R.

    1972-01-01

    The activities and results of the Atmospheric Science Facility preliminary design study are reported. The objectives of the study were to define the scientific goals, to determine the range of experiment types, and to develop the preliminary instrument design requirements for a reusable, general purpose, optical research facility for investigating the earth's atmosphere from a space shuttle orbital vehicle.

  14. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  15. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  16. A research program to reduce interior noise in general aviation airplanes. Design of an acoustic panel test facility

    NASA Technical Reports Server (NTRS)

    Roskam, J.; Muirhead, V. U.; Smith, H. W.; Henderson, T. D.

    1977-01-01

    The design, construction, and costs of a test facility for determining the sound transmission loss characteristics of various panels and panel treatments are described. The pressurization system and electronic equipment used in experimental testing are discussed as well as the reliability of the facility and the data gathered. Tests results are compared to pertinent acoustical theories for panel behavior and minor anomalies in the data are examined. A method for predicting panel behavior in the stiffness region is also presented.

  17. Radiation shielding design of a new tomotherapy facility.

    PubMed

    Zacarias, Albert; Balog, John; Mills, Michael

    2006-10-01

    It is expected that intensity modulated radiation therapy (IMRT) and image guided radiation therapy (IGRT) will replace a large portion of radiation therapy treatments currently performed with conventional MLC-based 3D conformal techniques. IGRT may become the standard of treatment in the future for prostate and head and neck cancer. Many established facilities may convert existing vaults to perform this treatment method using new or upgraded equipment. In the future, more facilities undoubtedly will be considering de novo designs for their treatment vaults. A reevaluation of the design principles used in conventional vault design is of benefit to those considering this approach with a new tomotherapy facility. This is made more imperative as the design of the TomoTherapy system is unique in several aspects and does not fit well into the formalism of NCRP 49 for a conventional linear accelerator.

  18. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... This is the mean and standard deviation, respectively, of the differences between the known sample... sample analysis, and the materials necessary to perform the tests; (2) Each facility test rig must be of... facilities. (a) Each request for designation as a facility authorized to perform approval tests must be...

  19. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, R.S.; Diamante, J.M.; Duffey, R.B.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less

  20. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  1. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  2. Research on the Construction Management and Sustainable Development of Large-Scale Scientific Facilities in China

    NASA Astrophysics Data System (ADS)

    Guiquan, Xi; Lin, Cong; Xuehui, Jin

    2018-05-01

    As an important platform for scientific and technological development, large -scale scientific facilities are the cornerstone of technological innovation and a guarantee for economic and social development. Researching management of large-scale scientific facilities can play a key role in scientific research, sociology and key national strategy. This paper reviews the characteristics of large-scale scientific facilities, and summarizes development status of China's large-scale scientific facilities. At last, the construction, management, operation and evaluation of large-scale scientific facilities is analyzed from the perspective of sustainable development.

  3. 24 CFR 941.402 - Project design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...

  4. 7 CFR 3575.42 - Design and construction requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Design and construction requirements. 3575.42 Section..., DEPARTMENT OF AGRICULTURE GENERAL Community Programs Guaranteed Loans § 3575.42 Design and construction... all funds were utilized for authorized purposes. The borrower and the lender will authorize designs...

  5. Acoustical Design of Music Education Facilities.

    ERIC Educational Resources Information Center

    McCue, Edward, Ed.; Talaske, Richard H., Ed.

    This publication provides essays on the acoustical design of music education facilities and reproductions of posters describing 50 projects presented at the 117th Meeting of the Acoustical Society of American held in Syracuse, New York in May 1989. Essays are as follows: "Introduction to the Design Process" (Richard Talaske); "The…

  6. An inventory of aeronautical ground research facilities. Volume 4: Engineering flight simulation facilities

    NASA Technical Reports Server (NTRS)

    Pirrello, C. J.; Hardin, R. D.; Capelluro, L. P.; Harrison, W. D.

    1971-01-01

    The general purpose capabilities of government and industry in the area of real time engineering flight simulation are discussed. The information covers computer equipment, visual systems, crew stations, and motion systems, along with brief statements of facility capabilities. Facility construction and typical operational costs are included where available. The facilities provide for economical and safe solutions to vehicle design, performance, control, and flying qualities problems of manned and unmanned flight systems.

  7. Revenue Bond Financing Auxiliary Service Facilities Construction at the State Colleges.

    ERIC Educational Resources Information Center

    Maryland Board of Trustees of the State Colleges, Baltimore.

    Since the State of Maryland does not provide funds for the construction of dormitories, dining halls, student activities, buildings, and similar ancillary services, an outline of cost responsibilities for such facilities in the state college system is presented. Based on a discussion of the financing methods for ancillary projects, the role of the…

  8. 7 CFR 3560.559 - Design and construction requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Design and construction requirements. 3560.559... § 3560.559 Design and construction requirements. (a) General. The requirements established in § 3560.60... encouraged that the design of off-farm labor housing incorporate outdoor shower, boot washing station, and/or...

  9. A lunar construction shack vehicle: Final design

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A lunar construction shack vehicle is a critical component in most of the plans proposed for the construction of a permanent base on the moon. The Selene Engineering Company (SEC) has developed a concept for this vehicle which is both innovative and practical. The design makes use of the most advanced technology available to meet the goals for a safe, versatile and durable habitat that will serve as a starting point for the initial phase of the construction of a permanent lunar base. This document outlines SEC's proposed design for a lander vehicle which will be fully self-sufficient and will provide for all necessary life support, including consumables and radiation protection, needed by the construction crew until they can complete the assembly of a more permanent habitat. Since it is highly likely that it will take more than one crew to complete the construction of a permanent lunar base, the design emphasis is on systems which can be easily maintained and resupplied and which will take a minimum of start up preparation by succeeding crews.

  10. Lunar base launch and landing facility conceptual design, 2nd edition

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This report documents the Lunar Base Launch and Landing Facility Conceptual Design study. The purpose of this study was to examine the requirements for launch and landing facilities for early lunar bases and to prepare conceptual designs for some of these facilities. The emphasis of this study is on the facilities needed from the first manned landing until permanent occupancy. Surface characteristics and flight vehicle interactions are described, and various facility operations are related. Specific recommendations for equipment, facilities, and evolutionary planning are made, and effects of different aspects of lunar development scenarios on facilities and operations are detailed. Finally, for a given scenario, a specific conceptual design is developed and presented.

  11. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  12. Interior Design Factors in Library Facilities.

    ERIC Educational Resources Information Center

    Jackson, Patricia Ann

    When planning the interior of a library facility, the planning team of librarian, library consultant, architect, and interior design consultant must focus attention on the basic principles of interior design and the psychological needs of the user. Colors for an interior should be selected with careful regard to space, light, and emotional and…

  13. Construction Services at Northern Arizona University.

    ERIC Educational Resources Information Center

    Van Dyke, Gary

    Construction Services is an innovative response to a chronic construction-remodeling problem at Northern Arizona State University. It is an in-house facilities maintenance department designed to address a variety of needs: prevention of construction or remodeling done by individual staff or faculty members without regard for applicable codes;…

  14. Construction, testing and development of large wind energy facilities

    NASA Technical Reports Server (NTRS)

    Windheim, R. (Editor); Cuntze, R. (Editor)

    1982-01-01

    Building large rotor blades and control of oscillations in large facilities are discussed. It is concluded that the technical problems in the design of large rotor blades and control of oscillations can be solved.

  15. Energy-Efficient Design for Florida Educational Facilities.

    ERIC Educational Resources Information Center

    Florida Solar Energy Center, Cape Canaveral.

    This manual provides a detailed simulation analysis of a variety of energy conservation measures (ECMs) with the intent of giving educational facility design teams in Florida a basis for decision making. The manual's three sections cover energy efficiency design considerations that appear throughout the following design processes: schematic…

  16. Designing for Education: Compendium of Exemplary Educational Facilities 2011

    ERIC Educational Resources Information Center

    OECD Publishing (NJ3), 2011

    2011-01-01

    "Designing for Education: Compendium of Exemplary Educational Facilities 2011" showcases over 60 recently built or refurbished educational facilities from 28 countries. Collectively, these projects demonstrate state-of-the-art design in this field and each one is lavishly illustrated with colour photos, plans and descriptions. [A free PDF is…

  17. Construction Grants for Educational Facilities, Fiscal Years 1965-77. Health Manpower References.

    ERIC Educational Resources Information Center

    Berman, Bella U.; Rosenthal, Samuel

    This publication provides information on construction assistance awarded to schools of medicine, osteopathic medicine, dentistry, optometry, pharmacy, podiatric medicine, veterinary medicine, public health, and nursing. In addition it provides data on grants awarded to schools of allied health, medical libraries, and health research facilities.…

  18. Architects' perspectives on construction waste reduction by design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-07-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previousmore » studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.« less

  19. Architects' perspectives on construction waste reduction by design.

    PubMed

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  20. Implications of system usability on intermodal facility design.

    DOT National Transportation Integrated Search

    2010-08-01

    Ensuring good design of intermodal transportation facilities is critical for effective and : satisfactory operation. Passenger use of the facilities is often hindered by inadequate space, a poor : layout, or lack of signage. This project aims to impr...

  1. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  2. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  3. 41 CFR 101-8.310 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FINANCIAL ASSISTANCE 8.3-Discrimination Prohibited on the Basis of Handicap § 101-8.310 New construction. (a... facility is readily accessible to, and usable by, handicapped persons, if the construction began after the... usable by handicapped persons. (c) GSA Accessibility Standard. Design, construction, or alteration of...

  4. 41 CFR 101-8.310 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FINANCIAL ASSISTANCE 8.3-Discrimination Prohibited on the Basis of Handicap § 101-8.310 New construction. (a... facility is readily accessible to, and usable by, handicapped persons, if the construction began after the... usable by handicapped persons. (c) GSA Accessibility Standard. Design, construction, or alteration of...

  5. 41 CFR 101-8.310 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FINANCIAL ASSISTANCE 8.3-Discrimination Prohibited on the Basis of Handicap § 101-8.310 New construction. (a... facility is readily accessible to, and usable by, handicapped persons, if the construction began after the... usable by handicapped persons. (c) GSA Accessibility Standard. Design, construction, or alteration of...

  6. 41 CFR 101-8.310 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FINANCIAL ASSISTANCE 8.3-Discrimination Prohibited on the Basis of Handicap § 101-8.310 New construction. (a... facility is readily accessible to, and usable by, handicapped persons, if the construction began after the... usable by handicapped persons. (c) GSA Accessibility Standard. Design, construction, or alteration of...

  7. 41 CFR 101-8.310 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FINANCIAL ASSISTANCE 8.3-Discrimination Prohibited on the Basis of Handicap § 101-8.310 New construction. (a... facility is readily accessible to, and usable by, handicapped persons, if the construction began after the... usable by handicapped persons. (c) GSA Accessibility Standard. Design, construction, or alteration of...

  8. 49 CFR 230.66 - Design, construction, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Steam Locomotives and Tenders § 230.66 Design, construction, and maintenance. The steam locomotive owner and operator are responsible for the general design, construction and maintenance of the steam locomotives and...

  9. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    ERIC Educational Resources Information Center

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  10. Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, Don; Barton, David; Case, Glenn

    2013-07-01

    The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibilitymore » for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary

  11. Raymond International Inc. will construct twin berthing facilities for loading and offloading crude

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-03-06

    Raymond International Inc. will construct twin berthing facilities for loading and offloading crude in St. James Parish, La. The $16.6 million contract was let under the Strategic Petroleum Reserve program. Completion is expected in 1978.

  12. Indoor Lighting Facilities

    NASA Astrophysics Data System (ADS)

    Matsushima, Koji; Saito, Yoshinori; Ichikawa, Shigenori; Kawauchi, Takao; Tanaka, Tsuneo; Hirano, Rika; Tazuke, Fuyuki

    According to the statistics by the Ministry of Land, Infrastructure and Transport, the total floor space of all building construction started was 188.87 million m2 (1.5% increase y/y), marking the fourth straight year of increase. Many large-scale buildings under construction in central Tokyo become fully occupied by tenants before completion. As for office buildings, it is required to develop comfortable and functional office spaces as working styles are becoming more and more diversified, and lighting is also an element of such functionalities. The total floor space of construction started for exhibition pavilions, multipurpose halls, conference halls and religious architectures decreased 11.1% against the previous year. This marked a decline for 10 consecutive years and the downward trend continues. In exhibition pavilions, the light radiation is measured and adjusted throughout the year so as not to damage the artworks by lighting. Hospitals, while providing higher quality medical services and enhancing the dwelling environment of patients, are expected to meet various restrictions and requirements, including the respect for privacy. Meanwhile, lighting designs for school classrooms tend to be homogeneous, yet new ideas are being promoted to strike a balance between the economical and functional aspects. The severe economic environment continues to be hampering the growth of theaters and halls in both the private and public sectors. Contrary to the downsizing trend of such facilities, additional installations of lighting equipment were conspicuous, and the adoption of high efficacy lighting appliances and intelligent function control circuits are becoming popular. In the category of stores/commercial facilities, the construction of complex facilities is a continuing trend. Indirect lighting, high luminance discharge lamps with excellent color rendition and LEDs are being effectively used in these facilities, together with the introduction of lighting designs

  13. Design and construction of a spectrometer facility and experiment for intermediate energy proton scattering on helium. [Wave functions, preliminary experimental techniques

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rolfe, R.M.

    1976-12-01

    The goal of the research was to investigate proton scattering on nuclei at intermediate energies and in particular to investigate proton scattering on helium. A theoretical investigation of the helium nucleus and the nature of the intermediate energy interaction, design and optimization of an energy-loss spectrometer facility for proton-nucleus scattering, and the unique superfluid helium target and experimental design are discussed.

  14. Proposed BISOL Facility - a Conceptual Design

    NASA Astrophysics Data System (ADS)

    Ye, Yanlin

    2018-05-01

    In China, a new large-scale nuclear-science research facility, namely the "Beijing Isotope-Separation-On-Line neutron-rich beam facility (BISOL)", has been proposed and reviewed by the governmental committees. This facility aims at both basic science and application goals, and is based on a double-driver concept. On the basic science side, the radioactive ion beams produced from the ISOL device, driven by a research reactor or by an intense deuteron-beam ac- celerator, will be used to study the new physics and technologies at the limit of the nuclear stability in the medium mass region. On the other side regarding to the applications, the facility will be devoted to the material research asso- ciated with the nuclear energy system, by using typically the intense neutron beams produced from the deuteron-accelerator driver. The initial design will be outlined in this report.

  15. 39 CFR 776.6 - Design requirements for construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Design requirements for construction. 776.6 Section 776.6 Postal Service UNITED STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Floodplain Management § 776.6 Design requirements for construction. If structures impact, are...

  16. Conceptual design of an in-space cryogenic fluid management facility, executive summary

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.

  17. 23 CFR 1235.7 - Parking space design, construction, and designation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Parking space design, construction, and designation. 1235.7 Section 1235.7 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GUIDELINES UNIFORM SYSTEM FOR PARKING FOR PERSONS WITH DISABILITIES § 1235.7 Parking space design,...

  18. Mass of materials: the impact of designers on construction ergonomics.

    PubMed

    Smallwood, John

    2012-01-01

    Many construction injuries are musculoskeletal related in the form of sprains and strains arising from the handling of materials, which are specified by designers. The paper presents the results of a study conducted among delegates attending two 'designing for H&S' (DfH&S) seminars using a questionnaire. The salient findings include: the level of knowledge relative to the mass and density of materials is limited; designers generally do not consider the mass and density of materials when designing structures and elements and specifying materials; to a degree designers appreciate that the mass and density of materials impact on construction ergonomics; designers rate their knowledge of the mass and density of materials as limited, and designers appreciate the potential of the consideration of the mass and density of materials to contribute to an improvement in construction ergonomics. Conclusions include: designers lack the requisite knowledge relative to the mass and density of materials; designers are thus precluded from conducting optimum design hazard identification and risk assessments, and tertiary built environment designer education does not enlighten designers relative to construction ergonomics. Recommendations include: tertiary built environment designer education should construction ergonomics; professional associations should raise the level of awareness relative to construction ergonomics, and design practices should include a category 'mass and density of materials' in their practice libraries.

  19. Environmental Assessment for Construction and Repair of Fuel Storage and Offloading Facilities at Kirtland Air Force Base

    DTIC Science & Technology

    2005-09-01

    G Ot-T GOO) D. BRENT WILSON, P.E. Base Civil Engineer Kirtland Air Force Base Kirtland AFB Fuel Storage and Ofjloading Facilities Construction...September 2005 A-1 3 77 MSG/CEVQ DEPARTMENT OF THE AIR FORCE 3 77th Civil Engineer Division (AFMC) 2050 Wyoming Blvd SE, Suite 120 Kirtland AFB NM...FINAL FINDING OF NO SIGNIFICANT IMPACT FOR THE FOR CONSTRUCTION AND REP AIR OF FUEL STORAGE AND OFFLOADING FACILITIES AT KIRTLAND AIR FORCE

  20. 75 FR 13340 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...--design and construction. Terminal facility improvements--design and construction. Runway pavement overlay... Collection at CHS and Use at CHS: Upgrade police radio communications. Design flight/baggage information... expansion--design. Standardize airfield signage. Restripe airfield taxiway and ramp edge. Improve airport...

  1. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  2. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  3. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  4. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  5. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  6. 46 CFR 58.05-1 - Material, design and construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  7. 46 CFR 58.05-1 - Material, design and construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  8. 46 CFR 58.05-1 - Material, design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  9. 46 CFR 58.05-1 - Material, design and construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  10. 46 CFR 58.05-1 - Material, design and construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... AUXILIARY MACHINERY AND RELATED SYSTEMS Main Propulsion Machinery § 58.05-1 Material, design and construction. (a) The material, design, construction, workmanship, and arrangement of main propulsion machinery...

  11. 40 CFR 60.140 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After... which the provisions of this subpart apply is each basic oxygen process furnace. (b) Any facility under...

  12. 40 CFR 60.140 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After... which the provisions of this subpart apply is each basic oxygen process furnace. (b) Any facility under...

  13. 40 CFR 60.140 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After... which the provisions of this subpart apply is each basic oxygen process furnace. (b) Any facility under...

  14. 40 CFR 60.140 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After... which the provisions of this subpart apply is each basic oxygen process furnace. (b) Any facility under...

  15. 40 CFR 60.140 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After... which the provisions of this subpart apply is each basic oxygen process furnace. (b) Any facility under...

  16. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  17. Designs for surge immunity in critical electronic facilities

    NASA Technical Reports Server (NTRS)

    Roberts, Edward F., Jr.

    1991-01-01

    In recent years, Federal Aviation Administration (FAA) embarked on a program replacing older tube type electronic equipment with newer solid state equipment. This replacement program dramatically increased the susceptibility of the FAA's facilities to lightning related damages. The proposal is presented of techniques which may be employed to lessen the susceptibility of new FAA electronic facility designs to failures resulting from lightning related surges and transients as well as direct strikes. The general concept espoused is one of a consistent system approach employing both perimeter and internal protection. It compares the technique presently employed to reduce electronic noise with other techniques which reduce noise while lowering susceptibility to lightning related damage. It is anticipated that these techniques will be employed in the design of an Air Traffic Control Tower in a high isokeraunic area. This facility would be subjected to rigorous monitoring over a multi-year period to provide quantitative data hopefully supporting the advantage of this design.

  18. Truck facility access design guidelines statewide.

    DOT National Transportation Integrated Search

    2011-06-01

    The overall purpose of this project is to develop design guidelines for truck access to truck stop facilities adjoining interstate highways and accessed by interchanges in Louisiana. The specific objectives of the research are to: 1. Identify existin...

  19. 23 CFR 652.13 - Design and construction criteria.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Design and construction criteria. 652.13 Section 652.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PEDESTRIAN AND BICYCLE ACCOMMODATIONS AND PROJECTS § 652.13 Design and construction criteria. (a) The American Association of State Highway and...

  20. Sustainability Base Construction Update

    NASA Technical Reports Server (NTRS)

    Mewhinney, Michael

    2012-01-01

    Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.

  1. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  2. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  3. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  4. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  5. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  6. A Facilities Manager's Guide to Green Building Design.

    ERIC Educational Resources Information Center

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  7. Transitioning to a New Facility: The Crucial Role of Employee Engagement.

    PubMed

    Slosberg, Meredith; Nejati, Adeleh; Evans, Jennie; Nanda, Upali

    Transitioning to a new facility can be challenging for employees and detrimental to operations. A key aspect of the transition is employee understanding of, and involvement in, the design of the new facility. The literature lacks a comprehensive study of the impact of change engagement throughout the design, construction, and activation of a project as well as how that can affect perceptions, expectations, and, eventually, satisfaction of employees. The purpose of this research was to examine employee perceptions and satisfaction throughout a hospital design, construction, and activation process. Three pulse-point surveys were administered throughout the transition of a children's hospital emergency department and neonatal intensive care unit to a new facility. We also administered a postoccupancy survey 3 months after the move into the new facility. We received 544 responses and analyzed them to assess the relationship between involvement in design or change engagement initiatives and overall perceptions. The results revealed a strong relationship between employee engagement and their level of preparedness to move, readiness to adapt, and satisfaction. Early involvement in the design of a facility or new processes can significantly affect staff preparedness and readiness to adapt as well as employees' overall satisfaction with the building after occupancy. In addition, our findings suggest that keeping a finger on the pulse of employee perceptions and expectations throughout the design, construction, and activation phase is critical to employee preparedness and satisfaction in transitioning to a new facility.

  8. 40 CFR 60.300 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Applicability and designation of affected facility. 60.300 Section 60.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Grain Elevators § 60.300 Applicability and designation of affected facility. (a) The...

  9. 40 CFR 60.300 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Applicability and designation of affected facility. 60.300 Section 60.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Grain Elevators § 60.300 Applicability and designation of affected facility. (a) The...

  10. Balancing Multiple Needs through Innovative Facility Design.

    ERIC Educational Resources Information Center

    Romano, C. Renee; Hanish, Jan

    2003-01-01

    Designing buildings that incorporate and integrate a number of departments and functions is one way that colleges and universities are balancing financial challenges and facility needs. These buildings can transform the campus, but they require planning and coordination from a carefully assembled design team. (Contains 18 references.) (Author)

  11. Design Portfolio, 1995. The Educational Facility Planner.

    ERIC Educational Resources Information Center

    The Educational Facility Planner, 1995

    1995-01-01

    This document contains nationally recognized educational-facility designs, including the 1994 James D. MacConnell Award Winner--Heritage Oak Elementary School in Roseville, California. The architectural designs of other schools are also included--10 elementary schools, 6 high schools, 1 vocational school, 3 institutes of higher education, 1…

  12. 39 CFR 776.6 - Design requirements for construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Design requirements for construction. 776.6 Section 776.6 Postal Service UNITED STATES POSTAL SERVICE ENVIRONMENTAL REGULATIONS FLOODPLAIN AND WETLAND PROCEDURES Floodplain Management § 776.6 Design requirements for construction. If structures impact, are located in, or support development in a...

  13. 21 CFR 129.20 - Plant construction and design.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 2 2013-04-01 2013-04-01 false Plant construction and design. 129.20 Section 129.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 129.20 Plant construction and design. (a) The bottling room shall be separated from other plant...

  14. 21 CFR 129.20 - Plant construction and design.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 2 2014-04-01 2014-04-01 false Plant construction and design. 129.20 Section 129.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 129.20 Plant construction and design. (a) The bottling room shall be separated from other plant...

  15. 21 CFR 129.20 - Plant construction and design.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 2 2012-04-01 2012-04-01 false Plant construction and design. 129.20 Section 129.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 129.20 Plant construction and design. (a) The bottling room shall be separated from other plant...

  16. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  17. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  18. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  19. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  20. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  1. Space simulation facilities providing a stable thermal vacuum facility

    NASA Technical Reports Server (NTRS)

    Tellalian, Martin L.

    1990-01-01

    CBI has recently constructed the Intermediate Thermal Vacuum Facility. Built as a corporate facility, the installation will first be used on the Boost Surveillance and Tracking System (BSTS) program. It will also be used to develop and test other sensor systems. The horizontal chamber has a horseshoe shaped cross section and is supported on pneumatic isolators for vibration isolation. The chamber structure was designed to meet stability and stiffness requirements. The design process included measurement of the ambient ground vibrations, analysis of various foundation test article support configurations, design and analysis of the chamber shell and modal testing of the chamber shell. A detailed 3-D finite element analysis was made in the design stage to predict the lowest three natural frequencies and mode shapes and to identify local vibrating components. The design process is described and the results are compared of the finite element analysis to the results of the field modal testing and analysis for the 3 lowest natural frequencies and mode shapes. Concepts are also presented for stiffening large steel structures along with methods to improve test article stability in large space simulation facilities.

  2. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  3. Problem Based Learning in Constructed Textile Design

    ERIC Educational Resources Information Center

    Sayer, Kate; Wilson, Jacquie; Challis, Simon

    2006-01-01

    Staff observing undergraduate students enrolled on the BSc Hons Textile Design and Design Management programme in The School of Materials, The University of Manchester, identified difficulties with knowledge retention in the area of constructed textile design. Consequently an experimental pilot was carried out in seamless knitwear design using a…

  4. Influence of gamma-ray skyshine on nuclear facilities design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ohta, M.; Tsuji, M.; Kimura, Y.

    1986-01-01

    In safety analysis of nuclear facilities, skyshine dose rate at site boundary is one of the most important shielding design problems. For nuclear power stations in Japan, the skyshine dose rate at the site boundary has been specified not to exceed 5 mR/yr by the authorities, including total dose contribution from all structures on site, and this guide is commonly applied to other nuclear fuel cycle facilities. Therefore the design criterion dose of each structure on site is, considering plot planning, shielding condition, and so on, defined as a value <5 mR/yr. The purpose of this study is to investigatemore » how skyshine dose standards or other factors have an influence on the design of nuclear facilities, in a parametric survey of gamma-ray skyshine.« less

  5. 40 CFR 60.260 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affected facility. 60.260 Section 60.260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Ferroalloy Production Facilities § 60.260 Applicability and designation of affected facility..., ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese...

  6. 40 CFR 60.260 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affected facility. 60.260 Section 60.260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Ferroalloy Production Facilities § 60.260 Applicability and designation of affected facility..., ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese...

  7. Cold Vacuum Drying facility civil structural system design description (SYS 06)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PITKOFF, C.C.

    This document describes the Cold Vacuum Drying (CVD) Facility civil - structural system. This system consists of the facility structure, including the administrative and process areas. The system's primary purpose is to provide for a facility to house the CVD process and personnel and to provide a tertiary level of containment. The document provides a description of the facility and demonstrates how the design meets the various requirements imposed by the safety analysis report and the design requirements document.

  8. Does PDC Belong in Facilities Management?

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  9. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  10. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  11. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  12. Design Report for the ½ Scale Air-Cooled RCCS Tests in the Natural convection Shutdown heat removal Test Facility (NSTF)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisowski, D. D.; Farmer, M. T.; Lomperski, S.

    The Natural convection Shutdown heat removal Test Facility (NSTF) is a large scale thermal hydraulics test facility that has been built at Argonne National Laboratory (ANL). The facility was constructed in order to carry out highly instrumented experiments that can be used to validate the performance of passive safety systems for advanced reactor designs. The facility has principally been designed for testing of Reactor Cavity Cooling System (RCCS) concepts that rely on natural convection cooling for either air or water-based systems. Standing 25-m in height, the facility is able to supply up to 220 kW at 21 kW/m 2 tomore » accurately simulate the heat fluxes at the walls of a reactor pressure vessel. A suite of nearly 400 data acquisition channels, including a sophisticated fiber optic system for high density temperature measurements, guides test operations and provides data to support scaling analysis and modeling efforts. Measurements of system mass flow rate, air and surface temperatures, heat flux, humidity, and pressure differentials, among others; are part of this total generated data set. The following report provides an introduction to the top level-objectives of the program related to passively safe decay heat removal, a detailed description of the engineering specifications, design features, and dimensions of the test facility at Argonne. Specifications of the sensors and their placement on the test facility will be provided, along with a complete channel listing of the data acquisition system.« less

  13. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  14. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  15. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  16. Teaching Construction: A Design-Based Course Model

    ERIC Educational Resources Information Center

    Love, Tyler S.; Salgado, Carlos A.

    2016-01-01

    The focus on construction in T&E education has drastically changed. This article presents a series of topics and design-based labs that can be taught at various grade levels to integrate STEM concepts while also increasing students' overall awareness of construction and structural technologies.

  17. Energy Conscious Design: Educational Facilities. [Brief No.] 1.

    ERIC Educational Resources Information Center

    American Inst. of Architects, Washington, DC.

    An energy task group of the American Institute of Architects discusses design features and options that educational facility designers can use to create an energy efficient school building. Design elements cover the building envelope, energy storage system, hydronic heating/cooling systems, solar energy collection, building orientation and shape,…

  18. 30 CFR 285.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources BUREAU OF... Requirements Activities Under An Approved Cop § 285.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to MMS the documents listed in the following...

  19. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  20. Health facilities humanisation: design guidelines supported by statistical evidence.

    PubMed

    Bosia, Daniela; Marino, Donatella; Peretti, Gabriella

    2016-01-01

    Healthcare building humanisation is currently a widely debated issue and the development of patient centered and evidence based design is growing worldwide. Many international health organizations and researchers understand the importance of Patient Centred Design and leading architects incorporate it into the design process. In Italy this design approach is still at an early stage. The article refers to research commissioned by the Italian Health Ministry and carried out by R. Del Nord (Università degli Studi di Firenze) and G. Peretti (Politecnico di Torino) with their collaborators. The scope of the research was the definition of design guidelines for healthcare facilities humanisation. The methodology framework adopted is the well established need and performance approach in architectural design. The article deals with the results of statistical investigations for the definition and ranking of users' needs and the consistent expression of their requirements. The investigations were carried out with the cooperation of psychologists of the Università degli Studi di Torino and researchers of the Università degli Studi di Cagliari. The proposed evaluation system allows ranking of health facilities according to the level of humanisation achieved. The statistical investigation evidence collected allowed the definition of humanisation design guidelines for health-care facilities and for the assessment of their specific level of humanisation.

  1. Lessons Learned from Radioactive Waste Storage and Disposal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esh, David W.; Bradford, Anna H.

    2008-01-15

    The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. Thismore » paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are

  2. Design of an autonomous Lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    Ash, Robert L.; Chew, Mason; Dixon, Iain (Editor)

    1990-01-01

    In order to prepare a site for a manned lunar base, an autonomously operated construction vehicle is necessary. A Lunar Construction Utility Vehicle (LCUV), which utilizes interchangeable construction implements, was designed conceptually. Some elements of the machine were studied in greater detail. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device was designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and computer interface. A study of hydrogen-oxygen fuel cells has produced estimates of reactant and product size requirements and identified multi-layer insulation techniques. Research on a 100 kW heat rejection system has determined that it is necessary to house a radiator panel on a utility trailer. The impact of a 720 hr use cycle has produced a very large logistical support lien which requires further study.

  3. Systematic design and three-dimensional simulation of X-ray FEL oscillator for Shanghai Coherent Light Facility

    NASA Astrophysics Data System (ADS)

    Li, Kai; Deng, Haixiao

    2018-07-01

    The Shanghai Coherent Light Facility (SCLF) is a quasi-continuous wave hard X-ray free electron laser facility, which is currently under construction. Due to the high repetition rate and high-quality electron beams, it is straightforward to consider X-ray free electron laser oscillator (XFELO) operation for the SCLF. In this paper, the main processes for XFELO design, and parameter optimization of the undulator, X-ray cavity, and electron beam are described. A three-dimensional X-ray crystal Bragg diffraction code, named BRIGHT, was introduced for the first time, which can be combined with the GENESIS and OPC codes for the numerical simulations of the XFELO. The performance of the XFELO of the SCLF is investigated and optimized by theoretical analysis and numerical simulation.

  4. Flexible Multi-Body Spacecraft Simulator: Design, Construction, and Experiments

    DTIC Science & Technology

    2017-12-01

    BODY SPACECRAFT SIMULATOR: DESIGN , CONSTRUCTION, AND EXPERIMENTS by Adam L. Atwood December 2017 Thesis Advisor: Mark Karpenko Second...TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE FLEXIBLE MULTI-BODY SPACECRAFT SIMULATOR: DESIGN , CONSTRUCTION, AND EXPERIMENTS 5...spacecraft simulator for use in testing optimal control-based slew and maneuver designs . The simulator is modified from an earlier prototype, which

  5. Designed to deter: Barriers to facilities at secondary schools in Ghana

    PubMed Central

    Owusu-Ansah, Frances E.; Alorwu, Divine

    2012-01-01

    Background There are varied and complex problems associated with the admission of students with disabilities into secondary (senior high) schools all over the world. This situation is further complicated by difficulties encountered in the built environment of these institutions and, in this, Ghana is no exception. Objectives This exploratory study investigated the level of accessibility of the built environment in secondary schools in eight out of the ten regions of Ghana, in order to determine whether they conform to guidelines provided in international building standards and also assess the extent to which they have been designed and constructed to meet the provisions of the Persons with Disability Act 2006, which allows for equal access to public buildings in Ghana. Method In total, 705 building elements in 264 facilities were surveyed using international standards, building codes, regulations and guidelines. These facilities included car parks, classrooms, dormitories, assembly halls, telephone booths and administration blocks. Results Our findings revealed that most of the building elements were barring and not disability-friendly. Just to name a few: there were obstructions on access routes to and around buildings, absence of designated car parks, unfriendly vertical and horizontal means of circulation in buildings and lack of accessible sanitary accommodations. In addition, the general lighting and signage were poor. As a result, very few students with disabilities are admitted and retained in these schools. Conclusion Mainstreaming of people with disabilities into the Ghanaian educational system remains impossible unless urgent action is taken to alter the facilities at secondary schools. Based on this research outcome, recommendations have been made to the Ghanaian government and the Ghana Education Service, as well as non-governmental organisations and relevant professional bodies for the amelioration of the present situation in our secondary schools

  6. A case study of collaborative facilities use in engineering design

    NASA Astrophysics Data System (ADS)

    Monroe, Laura; Pugmire, David

    2010-01-01

    In this paper we describe the use of visualization tools and facilities in the collaborative design of a replacement weapons system, the Reliable Replacement Warhead (RRW). We used not only standard collaboration methods but also a range of visualization software and facilities to bring together domain specialists from laboratories across the country to collaborate on the design and integrate this disparate input early in the design. This was the first time in U.S. weapons history that a weapon had been designed in this collaborative manner. Benefits included projected cost savings, design improvements and increased understanding across the project.

  7. Evaluation of design ventilation requirements for enclosed parking facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayari, A.; Krarti, M.

    2000-07-01

    This paper proposes a new design approach to determine the ventilation requirements for enclosed parking garages. The design approach accounts for various factors that affect the indoor air quality within a parking facility, including the average CO emission rate, the average travel time, the number of cars, and the acceptable CO level within the parking garage. This paper first describes the results of a parametric analysis based on the design method that was developed. Then the design method is presented to explain how the ventilation flow rate can be determined for any enclosed parking facility. Finally, some suggestions are proposedmore » to save fan energy for ventilating parking garages using demand ventilation control strategies.« less

  8. Treatment of CHP in LEED® for Building Design and Construction: New Construction and Major Renovations

    EPA Pesticide Factsheets

    This factsheet introduces CHP and its benefits to architects and engineers, and summarizes how CHP is treated under the LEED® for Building Design and Construction: New Construction and Major Renovations (LEED BD+C: New Construction) rating system.

  9. 40 CFR 60.270 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affected facility. 60.270 Section 60.270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... August 17, 1983 § 60.270 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in steel plants that produce carbon, alloy, or...

  10. 40 CFR 60.270 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affected facility. 60.270 Section 60.270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... August 17, 1983 § 60.270 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in steel plants that produce carbon, alloy, or...

  11. Promoting the Construction of an Optimal Nurse's Office Facility: One School District's Experience.

    ERIC Educational Resources Information Center

    McKibben, Cynthia; DiPaolo, Sonja J.

    1997-01-01

    Details recommendations for updating or constructing nurses' offices based upon a descriptive study done in one midwestern school district. Suggestions are provided on size, location, and equipment needed. Also addressed is the communication process needed to persuade a board of education and school administrators that nursing facilities must be a…

  12. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  13. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habib, T F; Koksal, C G; Moskal, T E

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility --more » the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs.« less

  14. E-4 Test Facility Design Status

    NASA Technical Reports Server (NTRS)

    Ryan, Harry; Canady, Randy; Sewell, Dale; Rahman, Shamim; Gilbrech, Rick

    2001-01-01

    Combined-cycle propulsion technology is a strong candidate for meeting NASA space transportation goals. Extensive ground testing of integrated air-breathing/rocket system (e.g., components, subsystems and engine systems) across all propulsion operational modes (e.g., ramjet, scramjet) will be needed to demonstrate this propulsion technology. Ground testing will occur at various test centers based on each center's expertise. Testing at the NASA John C. Stennis Space Center will be primarily concentrated on combined-cycle power pack and engine systems at sea level conditions at a dedicated test facility, E-4. This paper highlights the status of the SSC E-4 test Facility design.

  15. NASA Langley Low Speed Aeroacoustic Wind Tunnel: Background Noise and Flow Survey Results Prior to FY05 Construction of Facilities Modifications

    NASA Technical Reports Server (NTRS)

    Booth, Earl R., Jr.; Henderson, Brenda S.

    2005-01-01

    The NASA Langley Research Center Low Speed Aeroacoustic Wind Tunnel is a premier facility for model-scale testing of jet noise reduction concepts at realistic flow conditions. However, flow inside the open jet test section is less than optimum. A Construction of Facilities project, scheduled for FY 05, will replace the flow collector with a new design intended to reduce recirculation in the open jet test section. The reduction of recirculation will reduce background noise levels measured by a microphone array impinged by the recirculation flow and will improve flow characteristics in the open jet tunnel flow. In order to assess the degree to which this modification is successful, background noise levels and tunnel flow are documented, in order to establish a baseline, in this report.

  16. Infection prevention and control in the design of healthcare facilities.

    PubMed

    Farrow, Tye S; Black, Stephen M

    2009-01-01

    The lead paper, "Healthcare-Associated Infections as Patient Safety Indicators," written by Gardam, Lemieux, Reason, van Dijk and Goel, puts forward the design of healthcare facilities as one of many strategies to improve patient safety with respect to healthcare-associated infections. This commentary explores some of the issues in balancing infection prevention and control priorities with other needs and values brought to the design process. This balance is challenged not only by a lack of supporting evidence but also by the superficial nature in which infection prevention and control are often discussed within a design context. For the physical environment to support any patient safety initiative, the design of the processes must be developed in conjunction with that of the physical environment so that compliance can be natural and convenient. Finally, consideration is given to the value of documenting decision-making related to infection prevention and control in facility design and ongoing assessments of existing facilities.

  17. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  18. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  19. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  20. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  1. The challenge of logistics facilities development

    NASA Technical Reports Server (NTRS)

    Davis, James R.

    1987-01-01

    The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

  2. A new gated x-ray detector for the Orion laser facility

    NASA Astrophysics Data System (ADS)

    Clark, David D.; Aragonez, Robert; Archuleta, Thomas; Fatherley, Valerie; Hsu, Albert; Jorgenson, Justin; Mares, Danielle; Oertel, John; Oades, Kevin; Kemshall, Paul; Thomas, Phillip; Young, Trevor; Pederson, Neal

    2012-10-01

    Gated X-Ray Detectors (GXD) are considered the work-horse target diagnostic of the laser based inertial confinement fusion (ICF) program. Recently, Los Alamos National Laboratory (LANL) has constructed three new GXDs for the Orion laser facility at the Atomic Weapons Establishment (AWE) in the United Kingdom. What sets these three new instruments apart from what has previously been constructed for the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is: improvements in detector head microwave transmission lines, solid state embedded hard drive and updated control software, and lighter air box design and other incremental mechanical improvements. In this paper we will present the latest GXD design enhancements and sample calibration data taken on the Trident laser facility at Los Alamos National Laboratory using the newly constructed instruments.

  3. 40 CFR 61.90 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Emissions of Radionuclides Other Than Radon From Department of Energy Facilities § 61.90 Designation of... Department of Energy that emits any radionuclide other than radon-222 and radon-220 into the air, except that...

  4. 40 CFR 61.90 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Emissions of Radionuclides Other Than Radon From Department of Energy Facilities § 61.90 Designation of... Department of Energy that emits any radionuclide other than radon-222 and radon-220 into the air, except that...

  5. 40 CFR 35.2127 - Federal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2127 Federal facilities... day or 5 percent of the design flow of the complete waste treatment system, whichever is less...

  6. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  7. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  8. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  9. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  10. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  11. Improving Management of Military Construction Planning and Design

    DTIC Science & Technology

    1991-10-01

    waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing

  12. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 1: Executive summary

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.

  13. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.

  14. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  15. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  16. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  17. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  18. 40 CFR 60.170 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Primary Zinc Smelters § 60.170 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in primary zinc smelters...

  19. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  20. Design Criteria for Microbiological Facilities at Fort Detrick. Volume II: Design Criteria

    ERIC Educational Resources Information Center

    Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div.

    Volume II of a two-volume manual of design criteria, based primarily on biological safety considerations. It is prepared for the use of architect-engineers in designing new or modified microbiological facilities for Fort Detrick, Maryland. Volume II is divided into the following sections: (1) architectural, (2) heating, ventilating, and air…

  1. Design strategies for the International Space University's variable gravity research facility

    NASA Technical Reports Server (NTRS)

    Bailey, Sheila G.; Chiaramonte, Francis P.; Davidian, Kenneth J.

    1990-01-01

    A variable gravity research facility named 'Newton' was designed by 58 students from 13 countries at the International Space University's 1989 summer session at the Universite Louis Pasteur, Strasbourge, France. The project was comprehensive in scope, including a political and legal foundation for international cooperation, development and financing; technical, science and engineering issues; architectural design; plausible schedules; and operations, crew issues and maintenance. Since log-term exposure to zero gravity is known to be harmful to the human body, the main goal was to design a unique variable gravity research facility which would find a practical solution to this problem, permitting a manned mission to Mars. The facility would not duplicate other space-based facilities and would provide the flexibility for examining a number of gravity levels, including lunar and Martian gravities. Major design alternatives included a truss versus a tether based system which also involved the question of docking while spinning or despinning to dock. These design issues are described. The relative advantages or disadvantages are discussed, including comments on the necessary research and technology development required for each.

  2. 28 CFR 35.151 - New construction and alterations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... area. (C) Safe harbor. If a public entity has constructed or altered required elements of a path of... women, at least one roll-in shower shall be provided for each group. (f) Housing at a place of education... facility constructed by, on behalf of, or for the use of a public entity shall be designed and constructed...

  3. 40 CFR 60.710 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Magnetic Tape Coating Facilities § 60.710 Applicability and designation of affected facility... than 370 m3 of solvent for the manufacture of magnetic tape per calendar year is subject only to the... of magnetic tape equals or exceeds these amounts in any calendar year, the facility is subject to...

  4. 40 CFR 60.710 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Magnetic Tape Coating Facilities § 60.710 Applicability and designation of affected facility... than 370 m3 of solvent for the manufacture of magnetic tape per calendar year is subject only to the... of magnetic tape equals or exceeds these amounts in any calendar year, the facility is subject to...

  5. Feasibility study and verified design concept for new improved hot gas facility

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The MSFC Hot Gas Facility (HGF) was fabricated in 1975 as a temporary facility to provide immediate turnaround testing to support the SRB and ET TPS development. This facility proved to be very useful and was used to make more than 1300 runs, far more than ever intended in the original design. Therefore, it was in need of constant repair and needed to be replaced with a new improved design to support the continuing SRB/ET TPS product improvement and/or removal efforts. MSFC contracted with Lockheed-Huntsville to work on this improved design through contract NAS8-36304 Feasibility Study and Verified Design Concept for the New Improved Hot Gas Facility. The results of Lockheed-Huntsville's efforts under this contract are summarized.

  6. Status of the FLARE (Facility for Laboratory Reconnection Experiments) Construction Project and Plans as a User Facility

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.

    2016-10-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.

  7. The constructal law and the evolution of design in nature.

    PubMed

    Bejan, Adrian; Lorente, Sylvie

    2011-10-01

    The constructal law accounts for the universal phenomenon of generation and evolution of design (configuration, shape, structure, pattern, rhythm). This phenomenon is observed across the board, in animate, inanimate and human systems. The constructal law states the time direction of the evolutionary design phenomenon. It defines the concept of design evolution in physics. Along with the first and second law, the constructal law elevates thermodynamics to a science of systems with configuration. In this article we review the more recent work of our group, with emphasis on the advances made with the constructal law in the natural sciences. Highlighted are the oneness of animate and inanimate designs, the origin of finite-size organs on animals and vehicles, the flow of stresses as the generator of design in solid structures (skeletons, vegetation), the universality and rigidity of hierarchy in all flow systems, and the global design of human flows. Noteworthy is the tapestry of distributed energy systems, which balances nodes of production with networks of distribution on the landscape, and serves as key to energy sustainability and empowerment. At the global level, the constructal law accounts for the geography and design of human movement, wealth and communications. Copyright © 2011 Elsevier B.V. All rights reserved.

  8. Guidance Notes on Safer School Construction: Global Facility for Disaster Reduction and Recovery

    ERIC Educational Resources Information Center

    World Bank Publications, 2009

    2009-01-01

    This document provides a framework of guiding principles and general steps addressing the construction of safer and more disaster resilient education facilities. It is aimed to be adapted to the local context and used to develop a context-specific plan to address a critical gap to reaching the Education for All (EFA) and Millennium Development…

  9. 47 CFR 54.636 - Eligible participant-constructed and owned network facilities for consortium applicants.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...

  10. 47 CFR 54.636 - Eligible participant-constructed and owned network facilities for consortium applicants.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Support for Health Care Providers Healthcare Connect Fund § 54.636 Eligible participant-constructed and... proposals. Requests for proposals must provide sufficient detail so that cost-effectiveness can be evaluated... its own network facilities is the most cost-effective option after competitive bidding, pursuant to...

  11. Principles of Good School Building Design. School Buildings Planning, Design, and Construction Series No. 3.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on school building design issues, such as the fundamentals of good design and designs that accommodate change, issues affecting…

  12. Adopted technologies and basis for selection at municipal solid waste landfill facilities constructed in recent years in Japan.

    PubMed

    Asakura, Hiroshi; Matsuto, Toshihiko; Inoue, Yuzo

    2010-08-01

    In Japan, as the construction of new landfill facilities has become extremely difficult and the number of sites procured for landfill construction has decreased due to the 'not in my back yard' (NIMBY) syndrome, it has been assumed that the adoption of new technologies has increased. As the performance of new technologies exceeds that of conventional technologies, it is also assumed that residents would prefer the use of these new technologies and therefore any construction plans should be devised to ensure their use to ensure residents' satisfaction. In the present study, the technologies adopted for municipal solid waste landfill facilities constructed in recent years (2000 to 2004) in Japan and the bases for their adoption were investigated by means of a questionnaire survey. One of the main bases for the adoption of new technologies was the request by residents for new technology for roofing, rather than the other for new technologies for barrier systems, leachate treatment, and monitoring. In addition, it is possible that the municipalities did not recognize the difference between conventional and new technologies as defined in this study. The roof-type landfill that isolates waste from the surrounding environment was one of the requirements for the construction of new landfill facilities identified in the present investigation, and in this regard waste isolation should be required in all circumstances.

  13. Design and Construction of a High-speed Network Connecting All the Protein Crystallography Beamlines at the Photon Factory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matsugaki, Naohiro; Yamada, Yusuke; Igarashi, Noriyuki

    2007-01-19

    A private network, physically separated from the facility network, was designed and constructed which covered all the four protein crystallography beamlines at the Photon Factory (PF) and Structural Biology Research Center (SBRC). Connecting all the beamlines in the same network allows for simple authentication and a common working environment for a user who uses multiple beamlines. Giga-bit Ethernet wire-speed was achieved for the communication among the beamlines and SBRC buildings.

  14. Engineering test facility design definition

    NASA Technical Reports Server (NTRS)

    Bercaw, R. W.; Seikel, G. R.

    1980-01-01

    The Engineering Test Facility (ETF) is the major focus of the Department of Energy (DOE) Magnetohydrodynamics (MHD) Program to facilitate commercialization and to demonstrate the commercial operability of MHD/steam electric power. The ETF will be a fully integrated commercial prototype MHD power plant with a nominal output of 200 MW sub e. Performance of this plant is expected to meet or surpass existing utility standards for fuel, maintenance, and operating costs; plant availability; load following; safety; and durability. It is expected to meet all applicable environmental regulations. The current design concept conforming to the general definition, the basis for its selection, and the process which will be followed in further defining and updating the conceptual design.

  15. Design of an autonomous lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    1990-01-01

    In order to prepare a site for a lunar base, an autonomously operated construction vehicle is necessary. Discussed here is a Lunar Construction Utility Vehicle (LCUV), which uses interchangeable construction implements. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device has been designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and a computer interface. A study of hydrogen-oxygen fuel cells produced estimates of reactant and product requirements and identified multilayer insulation needs. Research on the 100-kW heat rejection system determined that it is necessary to transport the radiator panel on a utility trailer. Extensive logistical support for the 720 hour use cycle requires further study.

  16. Small engine components test facility compressor testing cell at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Brokopp, Richard A.; Gronski, Robert S.

    1992-01-01

    LeRC has designed and constructed a new test facility. This facility, called the Small Engine Components Facility (SECTF) is used to test gas turbines and compressors at conditions similar to actual engine conditions. The SECTF is comprised of a compressor testing cell and a turbine testing cell. Only the compressor testing cell is described. The capability of the facility, the overall facility design, the instrumentation used in the facility, and the data acquisition system are discussed in detail.

  17. Development of a Rotating Human Research Facility

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Caldwell, William F.; Tucker, John; Wade, Charles E. (Technical Monitor)

    1994-01-01

    A unique facility has been developed at the NASA Ames Research Center to provide scientists with unusual research opportunities at greater than Earth's gravity. In addition to its use for basic research, this facility will help provide answers to many of the questions posed by proponents of rotating human space vehicles. This paper describes the design and planned use of this facility, the Spaceflight Environmental Simulator. Using an existing 52-foot diameter cylindrical rotating platform design centrifuge, the revised facility design includes the provision of two human habitats for long duration studies of the effects of hypergravity. Up to four humans (per habitat) will be able to live at up to 2 G for as long as one month without stopping the centrifuge. Each habitat, constructed of lightweight honeycomb sandwich panels, is nominally 9 ft high x 11 ft wide x 25 1/2 ft long. A radial positioning system provides for positioning each habitat at a distance of 15 to 21 feet from the centrifuge's axis of rotation to the midpoint of the habitat's interior floor. As centrifugal acceleration changes with rotation rate, a habitat floor-mounted accelerometer signal provides automatic servo controlled adjustment of each habitat's angle of inclination to provide an environment for the habitat's crew and cargo in which the resultant gravity vector is normal to the habitat floor at all times. Design of the habitats and modifications to the centrifuge are complete, and are currently under construction. Design philosophy and operational rationale are presented along with complete descriptions of the facility and its systems.

  18. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    DTIC Science & Technology

    2013-03-01

    Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research

  19. New radiation protection calibration facility at CERN.

    PubMed

    Brugger, Markus; Carbonez, Pierre; Pozzi, Fabio; Silari, Marco; Vincke, Helmut

    2014-10-01

    The CERN radiation protection group has designed a new state-of-the-art calibration laboratory to replace the present facility, which is >20 y old. The new laboratory, presently under construction, will be equipped with neutron and gamma sources, as well as an X-ray generator and a beta irradiator. The present work describes the project to design the facility, including the facility placement criteria, the 'point-zero' measurements and the shielding study performed via FLUKA Monte Carlo simulations. © The Author 2013. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  20. An ARM Mobile Facility Designed for Marine Deployments

    NASA Astrophysics Data System (ADS)

    Wiscombe, W. J.

    2007-05-01

    The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.

  1. 76 FR 2617 - No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs 25 CFR Chapter I No Child Left Behind School... Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction Negotiated... Affairs and Collaborative Action, Office of the Assistant Secretary--Indian Affairs, 1001 Indian School...

  2. Earth integrated design: office dormitory facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H. B.; Barnes, P. R.

    1980-01-01

    The generation process of the design of the Joint Institute for Heavy Ion Research is described. Architectural and energy considerations are discussed. The facility will contain living quarters for guest scientists who come to Oak Ridge to conduct short experiments and sleeping alcoves for local researchers on long experimental shifts as well as office space. (MHR)

  3. 40 CFR 60.560 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section in a polypropylene or polyethylene production process is a potential affected facility for both... constructed, modified, or reconstructed and, in some instances, on the type of production process. (i) The... reconstructed after January 10, 1989, regardless of the type of production process being used, is January 10...

  4. 40 CFR 60.560 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section in a polypropylene or polyethylene production process is a potential affected facility for both... constructed, modified, or reconstructed and, in some instances, on the type of production process. (i) The... reconstructed after January 10, 1989, regardless of the type of production process being used, is January 10...

  5. Lateral support systems and underpinning, volume I : design and construction.

    DOT National Transportation Integrated Search

    1976-04-01

    "This volume is a convenient reference on the design and construction of lateral support systems and underpinning which are often required in conjunction with cut-and-cover or soft ground tunneling. The design recommendations and construction methods...

  6. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  7. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  8. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  9. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  10. The Impact of School Facility Construction and Renovation on Academic Achievement in Texas

    ERIC Educational Resources Information Center

    Holmes, Shannon J.

    2011-01-01

    The purpose of this study was to explore the possible relationship between school facility conditions and student academic achievement. Participating schools designated as having new facilities were determined by the campus earning an Educational Appropriateness Award from the Texas Association of School Boards between 2005 and 2009. Older…

  11. Towards the 21st Century. Facilities for Tertiary Education.

    ERIC Educational Resources Information Center

    Corbett, Anne, Ed.

    This report presents observations of experts in planning, design, construction or management of tertiary educational facilities about the emerging issues and the appropriate planning and architectural solutions for higher education facilities as the new millennium approaches. Specific topics discuss the current context of tertiary education…

  12. Lateral Support Systems And Underpinning. Volume I: Design And Construction

    DOT National Transportation Integrated Search

    1976-04-01

    This volume is a convenient reference on the design and construction of lateral support systems and underpining which are often required in conjunction with cut-and-cover or soft ground tunneling. The design recommendations and construction methods d...

  13. The constructal law of design and evolution in nature.

    PubMed

    Bejan, Adrian; Lorente, Sylvie

    2010-05-12

    Constructal theory is the view that (i) the generation of images of design (pattern, rhythm) in nature is a phenomenon of physics and (ii) this phenomenon is covered by a principle (the constructal law): 'for a finite-size flow system to persist in time (to live) it must evolve such that it provides greater and greater access to the currents that flow through it'. This law is about the necessity of design to occur, and about the time direction of the phenomenon: the tape of the design evolution 'movie' runs such that existing configurations are replaced by globally easier flowing configurations. The constructal law has two useful sides: the prediction of natural phenomena and the strategic engineering of novel architectures, based on the constructal law, i.e. not by mimicking nature. We show that the emergence of scaling laws in inanimate (geophysical) flow systems is the same phenomenon as the emergence of allometric laws in animate (biological) flow systems. Examples are lung design, animal locomotion, vegetation, river basins, turbulent flow structure, self-lubrication and natural multi-scale porous media. This article outlines the place of the constructal law as a self-standing law in physics, which covers all the ad hoc (and contradictory) statements of optimality such as minimum entropy generation, maximum entropy generation, minimum flow resistance, maximum flow resistance, minimum time, minimum weight, uniform maximum stresses and characteristic organ sizes. Nature is configured to flow and move as a conglomerate of 'engine and brake' designs.

  14. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  15. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  16. 7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exceptions must have prior National Office concurrence. (5) Energy conservation. Facility design should consider cost effective energy saving measures or devices. (6) Lead base paints. Lead base paints shall not... meet the requirements of the Safe Drinking Water Act (Pub. L. 93-523) and provide water of a quality...

  17. Construction and performance of the magnetic bunch compressor for the THz facility at Chiang Mai University

    NASA Astrophysics Data System (ADS)

    Saisut, J.; Kusoljariyakul, K.; Rimjaem, S.; Kangrang, N.; Wichaisirimongkol, P.; Thamboon, P.; Rhodes, M. W.; Thongbai, C.

    2011-05-01

    The Plasma and Beam Physics Research Facility at Chiang Mai University has established a THz facility to focus on the study of ultra-short electron pulses. Short electron bunches can be generated from a system that consists of a radio-frequency (RF) gun with a thermionic cathode, an alpha magnet as a magnetic bunch compressor, and a linear accelerator as a post-acceleration section. The alpha magnet is a conventional and simple instrument for low-energy electron bunch compression. With the alpha magnet constructed in-house, several hundred femtosecond electron bunches for THz radiation production can be generated from the thermionic RF gun. The construction and performance of the alpha magnet, as well as some experimental results, are presented in this paper.

  18. Code JEF Facilities Engineering Home Page for the Internet

    NASA Technical Reports Server (NTRS)

    Mahaffey, Valerie A.; Harrison, Marla J. (Technical Monitor)

    1995-01-01

    There are always many activities going on in JEF. We work on and manage the Construction of Facilities (C of F) projects at NASA-Ames. We are constantly designing or analyzing a new facility or project, or a modification to an existing facility. Every day we answer numerous questions about engineering policy, codes and standards, we attend design reviews, we count dollars and we make sure that everything at the Center is designed and built according to good engineering judgment. In addition, we study literature and attend conferences to make sure that we keep current on new legislation and standards.

  19. 40 CFR 61.250 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.250 Section 61.250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  20. 40 CFR 61.20 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.20 Section 61.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  1. 40 CFR 61.200 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.200 Section 61.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  2. 40 CFR 61.220 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.220 Section 61.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  3. 40 CFR 61.20 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.20 Section 61.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  4. 40 CFR 61.250 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.250 Section 61.250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  5. 40 CFR 61.220 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.220 Section 61.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  6. 40 CFR 61.200 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.200 Section 61.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  7. Space power distribution system technology. Volume 3: Test facility design

    NASA Technical Reports Server (NTRS)

    Decker, D. K.; Cannady, M. D.; Cassinelli, J. E.; Farber, B. F.; Lurie, C.; Fleck, G. W.; Lepisto, J. W.; Messner, A.; Ritterman, P. F.

    1983-01-01

    The AMPS test facility is a major tool in the attainment of more economical space power. The ultimate goals of the test facility, its primary functional requirements and conceptual design, and the major equipment it contains are discussed.

  8. Resident's concerns and attitudes towards Solid Waste Management facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rahardyan, B.; Matsuto, T.; Kakuta, Y.

    2004-07-01

    Because of limited space, the siting and construction of a new SWM facility is a big challenge in Japan. An SWM facility should be socially accepted as well as environmentally and economically sound. This study aimed to investigate people's concerns about SWM facilities and their attitudes towards such facilities. A questionnaire was designed based on literature reviews and was sent to residents in three municipalities with different backgrounds. The questions covered concerns on the impact of an SWM facility, management aspects, unfairness of facility siting, and attitudes to facility construction. Of the many concerns, 'pollution and health effect' had themore » highest rating, followed by 'reliability', 'damage to nature' and 'cost'. The rating was different between municipalities, reflecting their geographic and social backgrounds. Using factor analysis, correlations among concerns were analyzed, and five principal components were extracted, namely 'pollution', 'nuisance', 'facility management', 'planning of facility', and 'merit/demerit'. Although obvious correlations were not found between individual items of concern and attitudes to construction of a facility, the discriminant analysis indicated dominant concerns of attitudes, but the disagreement between actual impact and citizens were found. As for attributes, the 'opposed' attitude decreased for residents who had visited an SWM facility, even if they had only seen it from outside.« less

  9. 40 CFR 125.99 - What are approved design and construction technologies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...

  10. 40 CFR 125.99 - What are approved design and construction technologies?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...

  11. 40 CFR 125.99 - What are approved design and construction technologies?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...

  12. 40 CFR 125.99 - What are approved design and construction technologies?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...

  13. 40 CFR 125.99 - What are approved design and construction technologies?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following technologies constitute approved design and construction technologies for purposes of § 125.94(a)(4): (1...

  14. Design and construction of an impulse turbine

    NASA Astrophysics Data System (ADS)

    Hernández, E.

    2013-11-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic.

  15. Maglev guideway cost and construction schedule assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plotkin, D.; Kim, S.

    1997-05-01

    A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less

  16. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  17. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  18. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  19. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  20. 42 CFR 52b.8 - How will NIH monitor the use of facilities constructed with federal funds?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false How will NIH monitor the use of facilities constructed with federal funds? 52b.8 Section 52b.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS NATIONAL INSTITUTES OF HEALTH CONSTRUCTION GRANTS § 52b.8 How will NIH...

  1. Boat Building Design and Construction Techniques in the Architectural Design Studio.

    ERIC Educational Resources Information Center

    Smith, Richard A.

    1982-01-01

    Describes a model boat building project for architectural design studios. Working from traditional sailboat designs, students study the "lines" drawings of boats, make full-size drawings from scale drawings, and then construct model wooden boats. Available from Carfax Publishing Company, P.O. Box 25, Abindgon, Oxfordshire OX14 1RW…

  2. ETF Facility evaporator skid orifice sizing design analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ELLINGSON, S.D.

    1999-08-31

    This document releases and records the design analysis for sizing the Orifice plate being installed on the Effluent Treatment Facility (ETF) evaporator skid per Engineering Change Notice (ECN) 651583.

  3. National Biomedical Tracer Facility: Project definition study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heaton, R.; Peterson, E.; Smith, P.

    The Los Alamos National Laboratory is an ideal institution and New Mexico is an ideal location for siting the National Biomedical Tracer Facility (NBTF). The essence of the Los Alamos proposal is the development of two complementary irradiation facilities that combined with our existing radiochemical processing hot cell facilities and waste handling and disposal facilities provide a low cost alternative to other proposals that seek to satisfy the objectives of the NBTF. We propose the construction of a 30 MeV cyclotron facility at the site of the radiochemical facilities, and the construction of a 100 MeV target station at LAMPFmore » to satisfy the requirements and objectives of the NBTF. We do not require any modifications to our existing radiochemical processing hot cell facilities or our waste treatment and disposal facilities to accomplish the objectives of the NBTF. The total capital cost for the facility defined by the project definition study is $15.2 M. This cost estimate includes $9.9 M for the cyclotron and associated facility, $2.0 M for the 100 MeV target station at LAMPF, and $3.3 M for design.« less

  4. 76 FR 20287 - No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs 25 CFR Chapter I No Child Left Behind School... Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee will hold its sixth meeting in Albuquerque, New Mexico. The purpose of the meeting is to...

  5. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less

  6. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  7. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  8. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  9. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  10. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  11. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  12. The constructal law of design and evolution in nature

    PubMed Central

    Bejan, Adrian; Lorente, Sylvie

    2010-01-01

    Constructal theory is the view that (i) the generation of images of design (pattern, rhythm) in nature is a phenomenon of physics and (ii) this phenomenon is covered by a principle (the constructal law): ‘for a finite-size flow system to persist in time (to live) it must evolve such that it provides greater and greater access to the currents that flow through it’. This law is about the necessity of design to occur, and about the time direction of the phenomenon: the tape of the design evolution ‘movie’ runs such that existing configurations are replaced by globally easier flowing configurations. The constructal law has two useful sides: the prediction of natural phenomena and the strategic engineering of novel architectures, based on the constructal law, i.e. not by mimicking nature. We show that the emergence of scaling laws in inanimate (geophysical) flow systems is the same phenomenon as the emergence of allometric laws in animate (biological) flow systems. Examples are lung design, animal locomotion, vegetation, river basins, turbulent flow structure, self-lubrication and natural multi-scale porous media. This article outlines the place of the constructal law as a self-standing law in physics, which covers all the ad hoc (and contradictory) statements of optimality such as minimum entropy generation, maximum entropy generation, minimum flow resistance, maximum flow resistance, minimum time, minimum weight, uniform maximum stresses and characteristic organ sizes. Nature is configured to flow and move as a conglomerate of ‘engine and brake’ designs. PMID:20368252

  13. 40 CFR 60.190 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Primary Aluminum Reduction Plants § 60.190 Applicability and designation of affected facility. (a) The affected facilities in primary aluminum reduction plants to which this subpart applies are...

  14. 46 CFR 160.132-7 - Design, construction, and performance of davits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Design, construction, and performance of davits. 160.132-7 Section 160.132-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Davits § 160.132-7 Design, construction, and...

  15. 46 CFR 160.132-7 - Design, construction, and performance of davits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Design, construction, and performance of davits. 160.132-7 Section 160.132-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Launching Appliances-Davits § 160.132-7 Design, construction, and...

  16. Design and Construction Documents Associated with N232, Sustainability Base

    NASA Technical Reports Server (NTRS)

    Zornetzer, Steven F.; Schuler, Raymond F.; Grymes, Rosalind A.

    2014-01-01

    This request comprehensively covers documents associated with the design and construction of Sustainability Base, N232. The intent of this project specifically envisioned broad dissemination of these materials to others undertaking the design and construction of high-performing energy- and resource-efficient buildings in comparable climate zones.

  17. Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This DOE standard gives design and evaluation criteria for natural phenomena hazards (NPH) effects as guidance for implementing the NPH mitigation requirements of DOE 5480.28. Goal of the criteria is to assure that DOE facilities can withstand the effects of earthquakes, extreme winds, tornadoes, flooding, etc. They apply to the design of new facilities and the evaluation of existing facilities; they may also be used for modification and upgrading of the latter.

  18. Electron Accelerator Shielding Design of KIPT Neutron Source Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhong, Zhaopeng; Gohar, Yousry

    The Argonne National Laboratory of the United States and the Kharkov Institute of Physics and Technology of the Ukraine have been collaborating on the design, development and construction of a neutron source facility at Kharkov Institute of Physics and Technology utilizing an electron-accelerator-driven subcritical assembly. The electron beam power is 100 kW using 100-MeV electrons. The facility was designed to perform basic and applied nuclear research, produce medical isotopes, and train nuclear specialists. The biological shield of the accelerator building was designed to reduce the biological dose to less than 5.0e-03 mSv/h during operation. The main source of the biologicalmore » dose for the accelerator building is the photons and neutrons generated from different interactions of leaked electrons from the electron gun and the accelerator sections with the surrounding components and materials. The Monte Carlo N-particle extended code (MCNPX) was used for the shielding calculations because of its capability to perform electron-, photon-, and neutron-coupled transport simulations. The photon dose was tallied using the MCNPX calculation, starting with the leaked electrons. However, it is difficult to accurately tally the neutron dose directly from the leaked electrons. The neutron yield per electron from the interactions with the surrounding components is very small, similar to 0.01 neutron for 100-MeV electron and even smaller for lower-energy electrons. This causes difficulties for the Monte Carlo analyses and consumes tremendous computation resources for tallying the neutron dose outside the shield boundary with an acceptable accuracy. To avoid these difficulties, the SOURCE and TALLYX user subroutines of MCNPX were utilized for this study. The generated neutrons were banked, together with all related parameters, for a subsequent MCNPX calculation to obtain the neutron dose. The weight windows variance reduction technique was also utilized for both neutron

  19. IT Requirements Integration in High-Rise Construction Design Projects

    NASA Astrophysics Data System (ADS)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  20. 40 CFR 60.170 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Primary Zinc Smelters § 60.170 Applicability and designation of affected facility. (a) The...: roaster and sintering machine. (b) Any facility under paragraph (a) of this section that commences...

  1. 46 CFR 160.066-5 - Design, construction, and manufacturing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Design, construction, and manufacturing requirements... Boats, Red Aerial Pyrotechnic Flare § 160.066-5 Design, construction, and manufacturing requirements. (a... details occurs; (2) Any change in sources of raw materials occurs; (3) Production is started on a new...

  2. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  3. MAN-004 Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-07-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  4. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  5. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  6. Water facilities in retrospect and prospect: An illuminating tool for vehicle design

    NASA Technical Reports Server (NTRS)

    Erickson, G. E.; Peak, D. J.; Delfrate, J.; Skow, A. M.; Malcolm, G. N.

    1986-01-01

    Water facilities play a fundamental role in the design of air, ground, and marine vehicles by providing a qualitative, and sometimes quantitative, description of complex flow phenomena. Water tunnels, channels, and tow tanks used as flow-diagnostic tools have experienced a renaissance in recent years in response to the increased complexity of designs suitable for advanced technology vehicles. These vehicles are frequently characterized by large regions of steady and unsteady three-dimensional flow separation and ensuing vortical flows. The visualization and interpretation of the complicated fluid motions about isolated vehicle components and complete configurations in a time and cost effective manner in hydrodynamic test facilities is a key element in the development of flow control concepts, and, hence, improved vehicle designs. A historical perspective of the role of water facilities in the vehicle design process is presented. The application of water facilities to specific aerodynamic and hydrodynamic flow problems is discussed, and the strengths and limitations of these important experimental tools are emphasized.

  7. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  8. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  9. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  10. 40 CFR 60.560 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) manufacturing processes. (i) Affected facilities with a design capacity to produce less than 1,000 Mg/yr (1,102... Performance for Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry § 60.560... apply to affected facilities involved in the manufacture of polypropylene, polyethylene, polystyrene, or...

  11. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  12. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  13. 40 CFR 60.620 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Petroleum Dry Cleaners § 60.620 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities located at a petroleum dry... pounds): Petroleum solvent dry cleaning dryers, washers, filters, stills, and settling tanks. (1) When...

  14. 40 CFR 60.500 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Bulk Gasoline Terminals § 60.500 Applicability and designation of affected facility. (a) The... bulk gasoline terminal which deliver liquid product into gasoline tank trucks. (b) Each facility under... technologies (BDT). The numerical emission limits in this standard are expressed in terms of total organic...

  15. 40 CFR 60.500 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Bulk Gasoline Terminals § 60.500 Applicability and designation of affected facility. (a) The... bulk gasoline terminal which deliver liquid product into gasoline tank trucks. (b) Each facility under... technologies (BDT). The numerical emission limits in this standard are expressed in terms of total organic...

  16. The Discovery Channel Telescope: Construction and Design Progress, January 2007

    NASA Astrophysics Data System (ADS)

    Bida, Thomas A.; Millis, R. L.; Smith, B. W.; Dunham, E. W.; Marshall, H.

    2006-12-01

    The Discovery Channel Telescope (DCT) is a 4.2m telescope under construction in northern Arizona. The DCT is located at a new site near Happy Jack at 2361m elevation, which was selected following a lengthy site testing campaign that demonstrated DIMM-characterized median ground-level seeing of 0.84-arcsec FWHM. The DCT science mission includes targeted studies of astrophysical and solar system objects utilizing RC and Nasmyth-mounted imaging and spectroscopic instrumentation, and wide-field surveys of KBO’s, NEA’s, and astrophysical objects with a 2-degree FOV prime focus camera. The DCT facility enclosure and control buildings will be completed soon, including the telescope mount and dome supports, major machinery infrastructure, the instrument laboratory, control and computer rooms, and the auxiliary building for the mirror coating plant. Meanwhile, the effort for final figuring and polishing of the 4.3m ULE meniscus primary mirror blank began in August 2006 at the University of Arizona College of Optical Sciences. The primary mirror and its design support, and the integrated telescope mount model, were finite-element analyzed to optimize the design of the mirror and top-end support configurations. The primary mirror axial and tangential actuators will be fabricated in early 2007 and utilized in the final figure and polish cycle. The prime focus camera design has been refined to achieve atmospheric dispersion-compensated 0.25-arcsec images at 1-degree field radius, from B to I-band, at reduced cost through simplification of glasses to standard types and utilization of spheres on all but two lens surfaces. The Discovery Channel Telescope is a project of the Lowell Observatory with major financial support from Discovery Communications, Inc. (DCI). DCI plans ongoing television programming featuring the construction of the telescope and the research ultimately conducted with the DCT. Lowell Observatory and Discovery Communications are actively seeking additional

  17. The design of a multisource americium-beryllium (Am-Be) neutron irradiation facility using MCNP for the neutronic performance calculation.

    PubMed

    Sogbadji, R B M; Abrefah, R G; Nyarko, B J B; Akaho, E H K; Odoi, H C; Attakorah-Birinkorang, S

    2014-08-01

    The americium-beryllium neutron irradiation facility at the National Nuclear Research Institute (NNRI), Ghana, was re-designed with four 20 Ci sources using Monte Carlo N-Particle (MCNP) code to investigate the maximum amount of flux that is produced by the combined sources. The results were compared with a single source Am-Be irradiation facility. The main objective was to enable us to harness the maximum amount of flux for the optimization of neutron activation analysis and to enable smaller sample sized samples to be irradiated. Using MCNP for the design construction and neutronic performance calculation, it was realized that the single-source Am-Be design produced a thermal neutron flux of (1.8±0.0007)×10(6) n/cm(2)s and the four-source Am-Be design produced a thermal neutron flux of (5.4±0.0007)×10(6) n/cm(2)s which is a factor of 3.5 fold increase compared to the single-source Am-Be design. The criticality effective, k(eff), of the single-source and the four-source Am-Be designs were found to be 0.00115±0.0008 and 0.00143±0.0008, respectively. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Designing Anticancer Peptides by Constructive Machine Learning.

    PubMed

    Grisoni, Francesca; Neuhaus, Claudia S; Gabernet, Gisela; Müller, Alex T; Hiss, Jan A; Schneider, Gisbert

    2018-04-21

    Constructive (generative) machine learning enables the automated generation of novel chemical structures without the need for explicit molecular design rules. This study presents the experimental application of such a deep machine learning model to design membranolytic anticancer peptides (ACPs) de novo. A recurrent neural network with long short-term memory cells was trained on α-helical cationic amphipathic peptide sequences and then fine-tuned with 26 known ACPs by transfer learning. This optimized model was used to generate unique and novel amino acid sequences. Twelve of the peptides were synthesized and tested for their activity on MCF7 human breast adenocarcinoma cells and selectivity against human erythrocytes. Ten of these peptides were active against cancer cells. Six of the active peptides killed MCF7 cancer cells without affecting human erythrocytes with at least threefold selectivity. These results advocate constructive machine learning for the automated design of peptides with desired biological activities. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  19. Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    The Department of Energy (DOE) has issued an Order 420.1 which establishes policy for its facilities in the event of natural phenomena hazards (NPH) along with associated NPH mitigation requirements. This DOE Standard gives design and evaluation criteria for NPH effects as guidance for implementing the NPH mitigation requirements of DOE Order 420.1 and the associated implementation Guides. These are intended to be consistent design and evaluation criteria for protection against natural phenomena hazards at DOE sites throughout the United States. The goal of these criteria is to assure that DOE facilities can withstand the effects of natural phenomena suchmore » as earthquakes, extreme winds, tornadoes, and flooding. These criteria apply to the design of new facilities and the evaluation of existing facilities. They may also be used for modification and upgrading of existing facilities as appropriate. The design and evaluation criteria presented herein control the level of conservatism introduced in the design/evaluation process such that earthquake, wind, and flood hazards are treated on a consistent basis. These criteria also employ a graded approach to ensure that the level of conservatism and rigor in design/evaluation is appropriate for facility characteristics such as importance, hazards to people on and off site, and threat to the environment. For each natural phenomena hazard covered, these criteria consist of the following: Performance Categories and target performance goals as specified in the DOE Order 420.1 NPH Implementation Guide, and DOE-STD-1 021; specified probability levels from which natural phenomena hazard loading on structures, equipment, and systems is developed; and design and evaluation procedures to evaluate response to NPH loads and criteria to assess whether or not computed response is permissible.« less

  20. A button - type beam position monitor design for TARLA facility

    NASA Astrophysics Data System (ADS)

    Gündoǧan, M. Tural; Kaya, ć.; Yavaş, Ö.

    2016-03-01

    Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) facility is proposed as an IR FEL and Bremsstrahlung facility as the first facility of Turkish Accelerator Center (TAC). TARLA is essentially proposed to generate oscillator mode FEL in 3-250 microns wavelengths range, will consist of normal conducting injector system with 250 keV beam energy, two superconducting RF accelerating modules in order to accelerate the beam 15-40 MeV. The TARLA facility is expected to provide two modes, Continuous wave (CW) and pulsed mode. Longitudinal electron bunch length will be changed between 1 and 10 ps. The bunch charge will be limited by 77pC. The design of the Button-type Beam Position Monitor for TARLA IR FEL is studied to operate in 1.3 GHz. Mechanical antenna design and simulations are completed considering electron beam parameters of TARLA. Ansoft HFSS and CST Particle Studio is used to compare with results of simulations.

  1. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  2. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  3. A performance goal-based seismic design philosophy for waste repository facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hossain, Q.A.

    1994-12-31

    A performance goal-based seismic design philosophy, compatible with DOE`s present natural phenomena hazards mitigation and {open_quotes}graded approach{close_quotes} philosophy, has been proposed for high level nuclear waste repository facilities. The rationale, evolution, and the desirable features of this method have been described. Why and how the method should and can be applied to the design of a repository facility are also discussed.

  4. Harold P. Geerdes on Musical Facility Design.

    ERIC Educational Resources Information Center

    Wagner, Michael

    1996-01-01

    Presents an interview with Dr. Harold P. Geerdes, world-renowned music facility planner, acoustician, and music professor. Dr. Geerdes discusses the different characteristics of rehearsal spaces and concert halls as well as the importance of interior materials and design. He also provides some easy and inexpensive tips for schools. (MJP)

  5. 76 FR 33180 - Tribal Consultation on No Child Left Behind School Facilities and Construction Negotiated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... to obtain oral and written comments concerning a draft report to provide Congress and the Secretary... equitable distribution of funds to address those needs. The reports are to be submitted to Congress and to... Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee--Draft Report...

  6. Qualitative Variation in Constructive Alignment in Curriculum Design

    ERIC Educational Resources Information Center

    Trigwell, Keith; Prosser, Michael

    2014-01-01

    Constructive alignment has emerged as a powerful curriculum design idea, but little is known of the extent to which the effectiveness of this idea is a function of qualitative variation. This article introduces a model of qualitative variation in constructive alignment, and uses the results from known alignment studies to test the model. The…

  7. Design and Construction of Manned Lunar Base

    NASA Astrophysics Data System (ADS)

    Li, Zhijie

    2016-07-01

    Building manned lunar base is one of the core aims of human lunar exploration project, which is also an important way to carry out the exploitation and utilization of lunar in situ resources. The most important part of manned lunar base is the design and construction of living habitation and many factors should be considered including science objective and site selection. Through investigating and research, the scientific goals of manned lunar base should be status and characteristics ascertainment of lunar available in situ resources, then developing necessary scientific experiments and utilization of lunar in situ resources by using special environment conditions of lunar surface. The site selection strategy of manned lunar base should rely on scientific goals according to special lunar surface environment and engineering capacity constraints, meanwhile, consulting the landing sites of foreign unmanned and manned lunar exploration, and choosing different typical regions of lunar surface and analyzing the landform and physiognomy, reachability, thermal environment, sunlight condition, micro meteoroids protection and utilization of in situ resources, after these steps, a logical lunar living habitation site should be confirmed. This paper brings out and compares three kinds of configurations with fabricating processes of manned lunar base, including rigid module, flexible and construction module manned lunar base. 1.The rigid habitation module is usually made by metal materials. The design and fabrication may consult the experience of space station, hence with mature technique. Because this configuration cannot be folded or deployed, which not only afford limit working and living room for astronauts, but also needs repetitious cargo transit between earth and moon for lunar base extending. 2. The flexible module habitation can be folded in fairing while launching. When deploying on moon, the configuration can be inflatable or mechanically-deployed, which means under

  8. Anatomy Education in Namibia: Balancing Facility Design and Curriculum Development

    ERIC Educational Resources Information Center

    Wessels, Quenton; Vorster, Willie; Jacobson, Christian

    2012-01-01

    The anatomy curriculum at Namibia's first, and currently only, medical school is clinically oriented, outcome-based, and includes all of the components of modern anatomical sciences i.e., histology, embryology, neuroanatomy, gross, and clinical anatomy. The design of the facilities and the equipment incorporated into these facilities were directed…

  9. Defocusing beam line design for an irradiation facility at the TAEA SANAEM Proton Accelerator Facility

    NASA Astrophysics Data System (ADS)

    Gencer, A.; Demirköz, B.; Efthymiopoulos, I.; Yiğitoğlu, M.

    2016-07-01

    Electronic components must be tested to ensure reliable performance in high radiation environments such as Hi-Limu LHC and space. We propose a defocusing beam line to perform proton irradiation tests in Turkey. The Turkish Atomic Energy Authority SANAEM Proton Accelerator Facility was inaugurated in May 2012 for radioisotope production. The facility has also an R&D room for research purposes. The accelerator produces protons with 30 MeV kinetic energy and the beam current is variable between 10 μA and 1.2 mA. The beam kinetic energy is suitable for irradiation tests, however the beam current is high and therefore the flux must be lowered. We plan to build a defocusing beam line (DBL) in order to enlarge the beam size, reduce the flux to match the required specifications for the irradiation tests. Current design includes the beam transport and the final focusing magnets to blow up the beam. Scattering foils and a collimator is placed for the reduction of the beam flux. The DBL is designed to provide fluxes between 107 p /cm2 / s and 109 p /cm2 / s for performing irradiation tests in an area of 15.4 cm × 21.5 cm. The facility will be the first irradiation facility of its kind in Turkey.

  10. 30 CFR 285.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my Facility Design Report? 285.701 Section 285.701 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... Design, Fabrication, and Installation Reports § 285.701 What must I include in my Facility Design Report...

  11. 10 CFR 63.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... during construction, that are not within the predicted limits on which the facility design was based; (3... three categories of descending importance to public health and safety, as follows: (1) Those features...

  12. Construction of a Solid State Research Facility, Building 3150. Environmental Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration ofmore » the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems.« less

  13. 6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING CONSTRUCTION WAS HARDENED TO WITHSTAND THE FORCES IMPOSED BY A DESIGN-BASIS EARTHQUAKE OR TORNADO. (7/1/74) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  14. Design of carbon therapy facility based on 10 years experience at HIMAC

    NASA Astrophysics Data System (ADS)

    Noda, K.; Furukawa, T.; Iwata, Y.; Kanai, T.; Kanazawa, M.; Kanematsu, N.; Kitagawa, A.; Komori, M.; Minohara, S.; Murakami, T.; Muramatsu, M.; Sato, S.; Sato, Y.; Shibuya, S.; Torikoshi, M.; Yamada, S.

    2006-06-01

    Since 1994, the clinical trial for cancer therapy with HIMAC has successfully progressed, and more than 2100 cancer patients have been treated with a carbon beam. Based on the development of the accelerator and irradiation technologies for 10 years, we have designed a new carbon-therapy facility for widespread use in Japan, and key technologies for the new facility have been developed. We describe the conceptual design of the new facility and the status of development for the key technologies.

  15. Facility Design Considerations.

    ERIC Educational Resources Information Center

    Chase, William W.

    1967-01-01

    Increasing need for vocational education under the impetus of federal aid is generating a demand for vocational teaching facilities. Factors to be considered in planning these facilities inclued--(1) site development, (2) program needs, (3) administrative considerations, (4) environmental controls. (5) mechanical systems, and (6) area and space…

  16. The Influence of Older Age Groups to Sustainable Product Design Research of Urban Public Facilities

    NASA Astrophysics Data System (ADS)

    Wen-juan, Zhang; Hou-peng, Song

    2017-01-01

    Through summarize the status quo of public facilities design to older age groups in China and a variety of factors what influence on them, the essay, from different perspective, is designed to put forward basic principle to sustainable design of public facilities for the aged in the city, and thus further promote and popularize the necessity of sustainable design applications in the future design of public facilities for elderly people.

  17. The design of components for an advanced Rankine cycle test facility.

    NASA Technical Reports Server (NTRS)

    Bond, J. A.

    1972-01-01

    The design of a facility for testing components of an advanced Rankine cycle power system is summarized. The facility is a three-loop system in which lithium, potassium and NaK-78 are the working fluids of the primary, secondary and heat-rejection loops, respectively. Design bases and performance predictions for the major loop components, including the lithium heater and the potassium boiler, condenser and preheater, are outlined.

  18. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  19. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  20. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...