Sample records for facility design equipment

  1. Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

    NASA Technical Reports Server (NTRS)

    Thaxton, Eric A.; Mathews, Roger E.

    2014-01-01

    This standard establishes requirements and guidance for design and fabrication of ground systems (GS) that includes: ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F GSS) to provide uniform methods and processes for design and development of robust, safe, reliable, maintainable, supportable, and cost-effective GS in support of space flight and institutional programs and projects.

  2. Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

    NASA Technical Reports Server (NTRS)

    Thaxton, Eric A.

    2014-01-01

    KSC-DE-512-SM establishes overall requirements and best design practices to be used at the John F. Kennedy Space Center (KSC) for the development of ground systems (GS) in support of operations at launch, landing, and retrieval sites. These requirements apply to the design and development of hardware and software for ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F-GSS) used to support the KSC mission for transportation, receiving, handling, assembly, test, checkout, servicing, and launch of space vehicles and payloads and selected flight hardware items for retrieval. This standards manual supplements NASA-STD-5005 by including KSC-site-specific and local environment requirements. These requirements and practices are optional for equipment used at manufacturing, development, and test sites.

  3. Hot conditioning equipment conceptual design report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hotmore » Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.« less

  4. The automatic control system and stand-by facilities of the TDMA-40 equipment

    NASA Astrophysics Data System (ADS)

    Gudenko, D. V.; Pankov, G. Kh.; Pauk, A. G.; Tsirlin, V. M.

    1980-10-01

    When a controlling station in a satellite communications system is out of order, a complex algorithm must be carried out for automatic operation of the stand-by equipment. A processor has been developed to perform this algorithm, as well as operations involving the stand-by facilities of the receiving-transmitting equipment of the station. The design principles and solutions to problems in developing the equipment for the monitoring and controlling systems are described. These systems are based on multistation access using time division multiplexing. Algorithms are presented for the operation of the synchronizing processor and the control processor of the equipment. The automatic control system and stand-by facilities make it possible to reduce the service personnel and to design an unattended station.

  5. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  6. 46 CFR 160.151-45 - Equipment required for servicing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Equipment required for servicing facilities. 160.151-45 Section 160.151-45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT...) § 160.151-45 Equipment required for servicing facilities. Each servicing facility approved by the Coast...

  7. 40 CFR 270.310 - What equipment information must I keep at my facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (e.g., identify the hazardous waste management unit on a facility plot plan). (3) Type of equipment... compliance test required by 40 CFR 264.1033(j). (3) A design analysis, specifications, drawings, schematics... acceptable to the Director that present basic control device design information. The design analysis must...

  8. The gravitational plant physiology facility-Description of equipment developed for biological research in spacelab

    NASA Technical Reports Server (NTRS)

    Heathcote, D. G.; Chapman, D. K.; Brown, A. H.; Lewis, R. F.

    1994-01-01

    In January 1992, the NASA Suttle mission STS 42 carried a facility designed to perform experiments on plant gravi- and photo-tropic responses. This equipment, the Gravitational Plant Physiology Facility (GPPF) was made up of a number of interconnected units mounted within a Spacelab double rack. The details of these units and the plant growth containers designed for use in GPPF are described. The equipment functioned well during the mission and returned a substantial body of time-lapse video data on plant responses to tropistic stimuli under conditions of orbital microgravity. GPPF is maintained by NASA Ames Research Center, and is flight qualifiable for future spacelab missions.

  9. Designs for surge immunity in critical electronic facilities

    NASA Technical Reports Server (NTRS)

    Roberts, Edward F., Jr.

    1991-01-01

    In recent years, Federal Aviation Administration (FAA) embarked on a program replacing older tube type electronic equipment with newer solid state equipment. This replacement program dramatically increased the susceptibility of the FAA's facilities to lightning related damages. The proposal is presented of techniques which may be employed to lessen the susceptibility of new FAA electronic facility designs to failures resulting from lightning related surges and transients as well as direct strikes. The general concept espoused is one of a consistent system approach employing both perimeter and internal protection. It compares the technique presently employed to reduce electronic noise with other techniques which reduce noise while lowering susceptibility to lightning related damage. It is anticipated that these techniques will be employed in the design of an Air Traffic Control Tower in a high isokeraunic area. This facility would be subjected to rigorous monitoring over a multi-year period to provide quantitative data hopefully supporting the advantage of this design.

  10. Design and bidding of UV disinfection equipment -- Case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Akyurek, M.

    1998-07-01

    Ultraviolet (UV) disinfection systems are being widely considered for application to treated wastewaters, in lieu of conventional chlorination facilities. The number of UV systems operating in the US was approximately 50 in 1984. In 1990 there were over 500 systems, a ten-fold increase. The use of UV disinfection has increased since 1990, and will likely to increase in the future. It is anticipated that as many chlorine disinfection facilities reach their useful life, most of them will be replaced with UV disinfection systems. Several manufacturers offer different UV disinfection equipment. Each offers something different for the designer. There are alsomore » different approaches used in estimating the number of lamps needed for the disinfection system. The lack of standardization in determination of the number of lamps for a UV system poses problems for the designer. Such was the case during the design of the disinfection system for the Watertown, SD Wastewater Treatment Plant (WWRP). The purpose of this paper is to present a case study for the design and bidding of UV disinfection equipment.« less

  11. Programs for Infants and Young Children. Part IV: Facilities and Equipment.

    ERIC Educational Resources Information Center

    Sale, June

    This manual is designed to facilitate planning for day care center facilities. Goals and principles of day care are discussed in relation to programs for infants, toddlers, and preschoolers with special attention to staff, parents, and community. Suggestions are presented for indoor and outdoor planning for such topics as equipment, supplies,…

  12. Experimental equipment for an advanced ISOL facility[Isotope Separation On-Line Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baktash, C.; Lee, I.Y.; Rehm, K.E.

    This report summarizes the proceedings and recommendations of the Workshop on the Experimental Equipment for an Advanced ISOL Facility which was held at Lawrence Berkeley National Laboratory on July 22--25, 1998. The purpose of this workshop was to discuss the performance requirements, manpower and cost estimates, as well as a schedule of the experimental equipment needed to fully exploit the new physics which can be studied at an advanced ISOL facility. An overview of the new physics opportunities that would be provided by such a facility has been presented in the White Paper that was issued following the Columbus Meeting.more » The reactions and experimental techniques discussed in the Columbus White Paper served as a guideline for the formulation of the detector needs at the Berkeley Workshop. As outlined a new ISOL facility with intense, high-quality beams of radioactive nuclei would provide exciting new research opportunities in the areas of: the nature of nucleonic matter; the origin of the elements; and tests of the Standard Model. After an introductory section, the following equipment is discussed: gamma-ray detectors; recoil separators; magnetic spectrographs; particle detectors; targets; and apparatus using non-accelerated beams.« less

  13. Standards for material handling and facilities equipment proofload testing

    NASA Technical Reports Server (NTRS)

    Bonn, S. P.

    1970-01-01

    Document provides information on verifying the safety of material handling and facilities equipment /MH/FE/, ranging from monorail systems to ladders and non-powered mobile equipment. Seven catagories of MH/FE equipment are defined.

  14. Space power distribution system technology. Volume 3: Test facility design

    NASA Technical Reports Server (NTRS)

    Decker, D. K.; Cannady, M. D.; Cassinelli, J. E.; Farber, B. F.; Lurie, C.; Fleck, G. W.; Lepisto, J. W.; Messner, A.; Ritterman, P. F.

    1983-01-01

    The AMPS test facility is a major tool in the attainment of more economical space power. The ultimate goals of the test facility, its primary functional requirements and conceptual design, and the major equipment it contains are discussed.

  15. Facilities and Equipment for Home Economics Education: Consumer and Homemaking, Occupational Home Economics.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia. Home Economics Education Section.

    Suggestions and recommendations presented in this guide are intended to provide teachers, administrators, and architects who plan and equip home economics departments with the objectives and an overview of home economics education programs so that functional facilities will be designed. The first section, consumer and homemaking education, lists…

  16. Lunar base launch and landing facility conceptual design, 2nd edition

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This report documents the Lunar Base Launch and Landing Facility Conceptual Design study. The purpose of this study was to examine the requirements for launch and landing facilities for early lunar bases and to prepare conceptual designs for some of these facilities. The emphasis of this study is on the facilities needed from the first manned landing until permanent occupancy. Surface characteristics and flight vehicle interactions are described, and various facility operations are related. Specific recommendations for equipment, facilities, and evolutionary planning are made, and effects of different aspects of lunar development scenarios on facilities and operations are detailed. Finally, for a given scenario, a specific conceptual design is developed and presented.

  17. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (2) Each type of equipment the facility proposes to test. (3) A description of the facility's... concentrations and the values obtained by the facility with their equipment. The value of X d for the 12... conduct approval tests— (1) A facility must have the management organization, equipment for conducting...

  18. Anatomy Education in Namibia: Balancing Facility Design and Curriculum Development

    ERIC Educational Resources Information Center

    Wessels, Quenton; Vorster, Willie; Jacobson, Christian

    2012-01-01

    The anatomy curriculum at Namibia's first, and currently only, medical school is clinically oriented, outcome-based, and includes all of the components of modern anatomical sciences i.e., histology, embryology, neuroanatomy, gross, and clinical anatomy. The design of the facilities and the equipment incorporated into these facilities were directed…

  19. Radiation shielding design of a new tomotherapy facility.

    PubMed

    Zacarias, Albert; Balog, John; Mills, Michael

    2006-10-01

    It is expected that intensity modulated radiation therapy (IMRT) and image guided radiation therapy (IGRT) will replace a large portion of radiation therapy treatments currently performed with conventional MLC-based 3D conformal techniques. IGRT may become the standard of treatment in the future for prostate and head and neck cancer. Many established facilities may convert existing vaults to perform this treatment method using new or upgraded equipment. In the future, more facilities undoubtedly will be considering de novo designs for their treatment vaults. A reevaluation of the design principles used in conventional vault design is of benefit to those considering this approach with a new tomotherapy facility. This is made more imperative as the design of the TomoTherapy system is unique in several aspects and does not fit well into the formalism of NCRP 49 for a conventional linear accelerator.

  20. 14 CFR 141.89 - Maintenance of personnel, facilities, and equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance of personnel, facilities, and... Maintenance of personnel, facilities, and equipment. The holder of a pilot school certificate or provisional... training unless: (a) Each airport, aircraft, and facility necessary for that training meets the standards...

  1. 14 CFR 141.89 - Maintenance of personnel, facilities, and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Maintenance of personnel, facilities, and... Maintenance of personnel, facilities, and equipment. The holder of a pilot school certificate or provisional... training unless: (a) Each airport, aircraft, and facility necessary for that training meets the standards...

  2. 14 CFR 141.89 - Maintenance of personnel, facilities, and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintenance of personnel, facilities, and... Maintenance of personnel, facilities, and equipment. The holder of a pilot school certificate or provisional... training unless: (a) Each airport, aircraft, and facility necessary for that training meets the standards...

  3. 14 CFR 141.89 - Maintenance of personnel, facilities, and equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance of personnel, facilities, and... Maintenance of personnel, facilities, and equipment. The holder of a pilot school certificate or provisional... training unless: (a) Each airport, aircraft, and facility necessary for that training meets the standards...

  4. 14 CFR 141.89 - Maintenance of personnel, facilities, and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintenance of personnel, facilities, and... Maintenance of personnel, facilities, and equipment. The holder of a pilot school certificate or provisional... training unless: (a) Each airport, aircraft, and facility necessary for that training meets the standards...

  5. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified tomore » include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less

  6. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Husler, R.O.; Weir, T.J.

    1991-12-31

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I&C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified to includemore » process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less

  7. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Equipment design. 792.61 Section 792... (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  8. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 24 2011-07-01 2011-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  9. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    ; at worst, operational performance would deteriorate. Elements of this methodology were applied to the design of three operations facilities for a series of rover field tests. These tests were observed by human-factors researchers and their conclusions are being used to refine and extend the methodology to be used in the final design of the MER operations facility. Further work is underway to evaluate the use of personal digital assistant (PDA) units as portable input interfaces and communication devices in future mission operations facilities. A PDA equipped for wireless communication and Ethernet, Bluetooth, or another networking technology would cost less than a complete computer system, and would enable a collaborator to communicate electronically with computers and with other collaborators while moving freely within the virtual environment created by a shared immersive graphical display.

  10. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  11. 21 CFR 58.61 - Equipment design.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  12. A Guide for Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    American Industrial Arts Association, Washington, DC. Equipment Guide Committee.

    A guide for planning new and revising existing industrial arts facilities which gives a listing of tools and equipment recommended for each of the major areas of instruction (automotive and power mechanics, ceramics, drafting, electronics, elementary, general shop, graphic arts, metalworking, plastics, and woodworking). General descriptions and…

  13. A GUIDE FOR EQUIPPING INDUSTRIAL ARTS FACILITIES.

    ERIC Educational Resources Information Center

    American Industrial Arts Association, Washington, DC. Equipment Guide Committee.

    SCHOOL ARCHITECTS, ADMINISTRATORS, PLANNERS, AND INDUSTRIAL ARTS SUPERVISORS AND TEACHERS MAY USE THIS GUIDE IN PLANNING, REVISING, AND EVALUATING FACILITIES. IN THE FIRST PART, HAND TOOLS, MACHINES, AND GENERAL EQUIPMENT ARE LISTED FOR (1) AUTO AND POWER MECHANICS, (2) CERAMICS, (3) DRAFTING, (4) ELECTRICITY-ELECTRONICS, (5) ELEMENTARY, (6)…

  14. Designing and Building to ``Impossible'' Tolerances for Vibration Sensitive Equipment

    NASA Astrophysics Data System (ADS)

    Hertlein, Bernard H.

    2003-03-01

    As the precision and production capabilities of modern machines and factories increase, our expectations of them rise commensurately. Facility designers and engineers find themselves increasingly involved with measurement needs and design tolerances that were almost unthinkable a few years ago. An area of expertise that demonstrates this very clearly is the field of vibration measurement and control. Magnetic Resonance Imaging, Semiconductor manufacturing, micro-machining, surgical microscopes — These are just a few examples of equipment or techniques that need an extremely stable vibration environment. The challenge to architects, engineers and contractors is to provide that level of stability without undue cost or sacrificing the aesthetics and practicality of a structure. In addition, many facilities have run out of expansion room, so the design is often hampered by the need to reuse all or part of an existing structure, or to site vibration-sensitive equipment close to an existing vibration source. High resolution measurements and nondestructive testing techniques have proven to be invaluable additions to the engineer's toolbox in meeting these challenges. The author summarizes developments in this field over the last fifteen years or so, and lists some common errors of design and construction that can cost a lot of money in retrofit if missed, but can easily be avoided with a little foresight, an appropriate testing program and a carefully thought out checklist.

  15. 40 CFR 160.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160.61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation...

  16. 40 CFR 792.61 - Equipment design.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the...

  17. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  18. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment for... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations...

  19. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...-AA26 Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... a final rule entitled ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment... responders for each vessel or facility with appropriate equipment and resources located in each zone of...

  20. 77 FR 70172 - Lifesaving and Fire-Fighting Equipment, Training and Drills Onboard Offshore Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Equipment, Training and Drills Onboard Offshore Facilities and Mobile Offshore Drilling Units (MODUs... lifesaving and fire-fighting equipment, training and drills on board offshore facilities and MODUs operating... guidance concerning lifesaving and fire-fighting equipment, training, and drills onboard manned offshore...

  1. Low back pain among workers in care facilities for the elderly after introducing welfare equipment.

    PubMed

    Iwakiri, Kazuyuki; Takahashi, Masaya; Sotoyama, Midori; Liu, Xinxin; Koda, Shigeki

    2016-07-29

    The purpose of this study was to clarify the causes of low back pain among workers in care facilities for the elderly after the introduction of welfare equipment. We conducted anonymous questionnaire surveys among administrators and care workers in eight elderly care facilities. The questionnaires were designed to investigate the status of both the care workers and facility. In reference to the care facility, the questionnaires were comprised items for investigating basic information, occupational safety, and health activities. For care workers, in addition to basic information, occupational safety, and health activities, the questionnaires also comprised items for investigating resident transfer and bathing methods, low back pain, and occupational stress. Completed questionnaires were returned by eight care facility administrators (response rate: 100%) and 373 care workers (response rate: 92.3%), among which 367 were used for analyses. Many care workers participated in a variety of occupational safety and health activities that were conducted in the facilities. Various types of welfare equipment were introduced into the care facilities and subsequently used by many care workers during resident transfer and bathing. As a result, 89.9% of the care workers reported having only slight or no low back pain. The remaining 10.1% reported having serious low back pain that interfered with their work. On the basis of logistic regression analysis, low back pain was associated with the following variables: failure to provide the appropriate method of care to each resident, failure of colleagues to discuss methods for improving care, lack of instructions regarding the use of welfare equipment, and inappropriate job rotation. An association was also found between low back pain and poor posture, poor resident-lifting technique, insufficient time to complete work, and a shortage of workers to assist with resident transfer or bathing. Although care workers received instructions on

  2. Preliminary design for a maglev development facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coffey, H.T.; He, J.L.; Chang, S.L.

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable ofmore » powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.« less

  3. 9 CFR 590.506 - Candling and transfer-room facilities and equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Candling and transfer-room facilities... INSPECTION ACT) Sanitary, Processing, and Facility Requirements § 590.506 Candling and transfer-room facilities and equipment. (a) The room shall be so constructed that it can be adequately darkened to assure...

  4. 9 CFR 590.506 - Candling and transfer-room facilities and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Candling and transfer-room facilities... INSPECTION ACT) Sanitary, Processing, and Facility Requirements § 590.506 Candling and transfer-room facilities and equipment. (a) The room shall be so constructed that it can be adequately darkened to assure...

  5. 9 CFR 590.506 - Candling and transfer-room facilities and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Candling and transfer-room facilities... INSPECTION ACT) Sanitary, Processing, and Facility Requirements § 590.506 Candling and transfer-room facilities and equipment. (a) The room shall be so constructed that it can be adequately darkened to assure...

  6. 9 CFR 590.506 - Candling and transfer-room facilities and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Candling and transfer-room facilities... INSPECTION ACT) Sanitary, Processing, and Facility Requirements § 590.506 Candling and transfer-room facilities and equipment. (a) The room shall be so constructed that it can be adequately darkened to assure...

  7. 14 CFR 147.37 - Maintenance of facilities, equipment, and material.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS... maintenance technician school shall provide facilities, equipment, and material equal to the standards...

  8. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a) Definition... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of Facilities, Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition...

  9. 21 CFR 225.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...

  10. 48 CFR 252.239-7012 - Title to telecommunication facilities and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Title to telecommunication... CLAUSES Text of Provisions And Clauses 252.239-7012 Title to telecommunication facilities and equipment. As prescribed in 239.7411(b), use the following clause: Title to Telecommunication Facilities and...

  11. 48 CFR 252.239-7012 - Title to telecommunication facilities and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Title to telecommunication... CLAUSES Text of Provisions And Clauses 252.239-7012 Title to telecommunication facilities and equipment. As prescribed in 239.7411(b), use the following clause: Title to Telecommunication Facilities and...

  12. 48 CFR 252.239-7012 - Title to telecommunication facilities and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Title to telecommunication... CLAUSES Text of Provisions And Clauses 252.239-7012 Title to telecommunication facilities and equipment. As prescribed in 239.7411(b), use the following clause: Title to Telecommunication Facilities and...

  13. 20 CFR 638.530 - Emergency use of personnel, equipment and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... facilities. 638.530 Section 638.530 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.530 Emergency use of personnel, equipment and facilities. The Job Corps Director may provide emergency...

  14. 48 CFR 252.239-7012 - Title to telecommunication facilities and equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Title to telecommunication... CLAUSES Text of Provisions And Clauses 252.239-7012 Title to telecommunication facilities and equipment. As prescribed in 239.7411(b), use the following clause: Title to Telecommunication Facilities and...

  15. 48 CFR 252.239-7012 - Title to telecommunication facilities and equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Title to telecommunication... CLAUSES Text of Provisions And Clauses 252.239-7012 Title to telecommunication facilities and equipment. As prescribed in 239.7411(b), use the following clause: Title to Telecommunication Facilities and...

  16. 14 CFR 147.13 - Facilities, equipment, and material requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Facilities, equipment, and material requirements. 147.13 Section 147.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS...

  17. 14 CFR 147.13 - Facilities, equipment, and material requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Facilities, equipment, and material requirements. 147.13 Section 147.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS...

  18. 14 CFR 147.13 - Facilities, equipment, and material requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Facilities, equipment, and material requirements. 147.13 Section 147.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS...

  19. 14 CFR 147.13 - Facilities, equipment, and material requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Facilities, equipment, and material requirements. 147.13 Section 147.13 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS...

  20. 7 CFR 56.17 - Equipment and facilities for graders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Equipment and facilities for graders. 56.17 Section 56.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  1. 7 CFR 56.17 - Equipment and facilities for graders.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Equipment and facilities for graders. 56.17 Section 56.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  2. 7 CFR 56.17 - Equipment and facilities for graders.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Equipment and facilities for graders. 56.17 Section 56.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  3. 7 CFR 56.17 - Equipment and facilities for graders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Equipment and facilities for graders. 56.17 Section 56.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  4. 7 CFR 56.17 - Equipment and facilities for graders.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Equipment and facilities for graders. 56.17 Section 56.17 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  5. 33 CFR 143.120 - Floating OCS facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT OCS Facilities § 143.120 Floating OCS facilities... (Marine Engineering) and J (Electrical Engineering) of 46 CFR chapter I and 46 CFR part 108 (Design and Equipment). Where unusual design or equipment needs make compliance impracticable, alternative proposals...

  6. Health maintenance facility: Dental equipment requirements

    NASA Technical Reports Server (NTRS)

    Young, John; Gosbee, John; Billica, Roger

    1991-01-01

    The objectives were to test the effectiveness of the Health Maintenance Facility (HMF) dental suction/particle containment system, which controls fluids and debris generated during simulated dental treatment, in microgravity; to test the effectiveness of fiber optic intraoral lighting systems in microgravity, while simulating dental treatment; and to evaluate the operation and function of off-the-shelf dental handheld instruments, namely a portable dental hand drill and temporary filling material, in microgravity. A description of test procedures, including test set-up, flight equipment, and the data acquisition system, is given.

  7. Lightning and surge protection, grounding, bonding and shielding requirements for facilities and electronic equipment

    DOT National Transportation Integrated Search

    2002-08-09

    This document mandates standard lightning protection, transient protection, electrostatic discharge (ESD), grounding, bonding and shielding configurations and procedures for new facilities, facility modifications, facility up grades, new equipment in...

  8. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  9. Applicability of Monte-Carlo Simulation to Equipment Design of Radioactive Noble Gas Monitor

    NASA Astrophysics Data System (ADS)

    Sakai, Hirotaka; Hattori, Kanako; Umemura, Norihiro

    In the nuclear facilities, radioactive noble gas is continuously monitored by using the radioactive noble gas monitor with beta-sensitive plastic scintillation radiation detector. The detection efficiency of the monitor is generally calibrated by using a calibration loop and standard radioactive noble gases such as 85Kr. In this study, the applicability of PHITS to the equipment design of the radioactive noble gas monitor was evaluated by comparing the calculated results to the test results obtained by actual calibration loop tests to simplify the radiation monitor design evaluation. It was confirmed that the calculated results were well matched to the test results of the monitor after the modeling. In addition, the key parameters for equipment design, such as thickness of detector window or depth of the sampler, were also specified and evaluated.

  10. [Usage survey of care equipment in care service facilities for the elderly].

    PubMed

    Iwakiri, Kazuyuki; Takahashi, Masaya; Sotoyama, Midori; Hirata, Mamoru; Hisanaga, Naomi

    2007-01-01

    Musculoskeletal disorders(MSD)have been increasing recently among care workers. Since providing care workers with appropriate equipment is effective for preventing MSD, we conducted a questionnaire survey in two nursing homes and a healthcare facility for the elderly to clarify equipment usage, problems and points for improvement. A total of 81 care workers(average age 32.2 yr; 63 females, 18 males)participated in the survey. The average number of residents and the average resident's care level were 70.0 and 3.6, respectively. Wheelchair and height adjustable beds were fully available and always used in all facilities. Portable lifts, ceiling lifts and transfer boards were, however, few in all 3 facilities and the proportion of use was 14.8%, 16.0%, and 23.5%, respectively. Participants reported that it is time consuming to move residents from place to place with lifts and there is a danger of dropping a resident. Although approximately 90% of care workers had received education and training on care techniques, the workload on the low back was found to be great. Therefore, we thought that care workers must consistently use care equipment. To achieve such increased usage, we must improve the usability of the equipment.

  11. 21 CFR 226.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR TYPE A MEDICATED ARTICLES Construction and Maintenance of Facilities and Equipment § 226.30 Equipment. Equipment used for the manufacture, processing, packaging, bulk... maintained in a clean and orderly manner and shall be of suitable design, size, construction, and location to...

  12. 14 CFR 147.37 - Maintenance of facilities, equipment, and material.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... material. 147.37 Section 147.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.37 Maintenance of facilities, equipment, and material. (a) Each certificated aviation...

  13. 14 CFR 147.37 - Maintenance of facilities, equipment, and material.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... material. 147.37 Section 147.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.37 Maintenance of facilities, equipment, and material. (a) Each certificated aviation...

  14. 14 CFR 147.37 - Maintenance of facilities, equipment, and material.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... material. 147.37 Section 147.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.37 Maintenance of facilities, equipment, and material. (a) Each certificated aviation...

  15. 14 CFR 147.37 - Maintenance of facilities, equipment, and material.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... material. 147.37 Section 147.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.37 Maintenance of facilities, equipment, and material. (a) Each certificated aviation...

  16. PROCESS AND EQUIPMENT CHANGES FOR CLEANER PRODUCTION IN FEDERAL FACILITIES

    EPA Science Inventory

    The paper discusses process and equipment changes for cleaner production in federal facilities. During the 1990s, DoD and EPA conducted joint research and development, aimed at reducing the discharge of hazardous and toxic pollutants from military production and maintenance faci...

  17. 20. VIEW OF TEST FACILITY IN 1967 WHEN EQUIPPED FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF TEST FACILITY IN 1967 WHEN EQUIPPED FOR DOSIMETER TEST BY HEALTH PHYSICISTS. CAMERA FACING EAST. INEL PHOTO NUMBER 76-2853, TAKEN MAY 16, 1967. PHOTOGRAPHER: CAPEK. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  18. Development of Army Facility Functionality Assessment Criteria and Procedures

    DTIC Science & Technology

    2010-09-01

    critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion

  19. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  20. Interim Stabilization Equipment Essential and Support Drawing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOCH, M.R.

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  1. Een Meetsysteem voor het Testen van Radiocommunicatie-Apparatuur (A measuring Facility for Testing of Radio Communication Equipment)

    DTIC Science & Technology

    1991-08-01

    insert various jamming signals. The criterion for classifying radio equipment under test is the quality of transferred information , that is the SINAD...UNCLASSFED) This report describes a test facility for measuring the behaviour and quality of radio communication equipment in a simulated operational...formation FEL has the disposal of a facility to test the quality of radio equipment in a simulated operational situation. (Y .. ,. -’ , / " " ’ TNO mppon 4

  2. LPT. Shield test facility (TAN645) interior. Mechanical equipment room with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645) interior. Mechanical equipment room with switchgear and control boards. Photographer: Jack L. Anderson. Date: February 20, 1959. INEEL negative no. 59-858 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  3. LPT. Shield test facility (TAN645) interior. Mechanical equipment room with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645) interior. Mechanical equipment room with airwasher and refrigeration compressor. Photographer: Jack L. Anderson. Date: February 20, 1959. INEEL negative no. 59-855 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  4. 46 CFR 108.239 - Fuel transfer equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Fuel transfer equipment. 108.239 Section 108.239 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.239 Fuel transfer equipment. (a...

  5. 46 CFR 108.239 - Fuel transfer equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Fuel transfer equipment. 108.239 Section 108.239 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.239 Fuel transfer equipment. (a...

  6. 46 CFR 108.239 - Fuel transfer equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Fuel transfer equipment. 108.239 Section 108.239 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.239 Fuel transfer equipment. (a...

  7. Safe design of healthcare facilities

    PubMed Central

    Reiling, J

    2006-01-01

    The physical environment has a significant impact on health and safety; however, hospitals have not been designed with the explicit goal of enhancing patient safety through facility design. In April 2002, St Joseph's Community Hospital of West Bend, a member of SynergyHealth, brought together leaders in healthcare and systems engineering to develop a set of safety‐driven facility design recommendations and principles that would guide the design of a new hospital facility focused on patient safety. By introducing safety‐driven innovations into the facility design process, environmental designers and healthcare leaders will be able to make significant contributions to patient safety. PMID:17142606

  8. Kistler reusable vehicle facility design and operational approach

    NASA Astrophysics Data System (ADS)

    Fagan, D.; McInerney, F.; Johnston, C.; Tolson, B.

    Kistler Aerospace Corporation is designing and developing the K-1, the world's first fully reusable aerospace vehicle to deliver satellites into orbit. The K-1 vehicle test program will be conducted in Woomera, Australia, with commercial operations scheduled to begin shortly afterwards. Both stages of the K-1 will return to the launch site utilizing parachutes and airbags for a soft landing within 24 h after launch. The turnaround flow of the two stages will cycle from landing site to a maintenance/refurbishment facility and through the next launch in only 9 days. Payload processing will occur in a separate facility in parallel with recovery and refurbishment operations. The vehicle design and on-board checkout capability of the avionics system eliminates the need for an abundance of ground checkout equipment. Payload integration, vehicle assembly, and K-1 transport to the launch pad will be performed horizontally, simplifying processing and reducing infrastructure requirements. This simple, innovative, and cost-effective approach will allow Kistler to offer its customers flexible, low-cost, and on-demand launch services.

  9. Design of a rib impactor equipment

    NASA Astrophysics Data System (ADS)

    Torres, C. R.; García, G.; Aguilar, L. A.; Martínez, L.

    2017-01-01

    The human ribs must be analyzed as long and as curved bones, due to their physiology. For the development of an experimental equipment that simulate the application of loads, over the rib in the moment of a frontal collision in an automobile with seat belt, it was applied a methodology that constituted in the identification of needs and the variables which led the design of 3D model, from this it was used the technique of fused deposition modeling for the development of the equipment pieces. The supports that hold the rib ends were design with two and three degrees of freedom that allows the simulation of rib movement with the spine and the breastbone in the breathing. For the simulation of the seat belt, it was determined to applied two loads over the front part of the rib from the sagittal and lateral plane respectively, for this it was made a displacement through a lineal actuator with a speed of 4mm/s. The outcomes shown a design of an equipment able to obtain the load parameters required to generate fractures in rib specimens. The equipment may be used for the study of specimens with nearby geometries to the rib taken as a reference.

  10. Floor vibration evaluations for medical facilities

    NASA Astrophysics Data System (ADS)

    Himmel, Chad N.

    2003-10-01

    The structural floor design for new medical facilities is often selected early in the design phase and in renovation projects, the floor structure already exists. Because the floor structure can often have an influence on the location of vibration sensitive medical equipment and facilities, it is becoming necessary to identify the best locations for equipment and facilities early in the design process. Even though specific criteria for vibration-sensitive uses and equipment may not always be available early in the design phase, it should be possible to determine compatible floor structures for planned vibration-sensitive uses by comparing conceptual layouts with generic floor vibration criteria. Relatively simple evaluations of planned uses and generic criteria, combined with on-site vibration and noise measurements early in design phase, can significantly reduce future design problems and expense. Concepts of evaluation procedures and analyses will be presented in this paper. Generic floor vibration criteria and appropriate parameters to control resonant floor vibration and noise will be discussed for typical medical facilities and medical research facilities. Physical, economic, and logistical limitations that affect implementation will be discussed through case studies.

  11. Innovation design of medical equipment based on TRIZ.

    PubMed

    Gao, Changqing; Guo, Leiming; Gao, Fenglan; Yang, Bo

    2015-01-01

    Medical equipment is closely related to personal health and safety, and this can be of concern to the equipment user. Furthermore, there is much competition among medical equipment manufacturers. Innovative design is the key to success for those enterprises. The design of medical equipment usually covers vastly different domains of knowledge. The application of modern design methodology in medical equipment and technology invention is an urgent requirement. TRIZ (Russian abbreviation of what can be translated as `theory of inventive problem solving') was born in Russia, which contain some problem-solving methods developed by patent analysis around the world, including Conflict Matrix, Substance Field Analysis, Standard Solution, Effects, etc. TRIZ is an inventive methodology for problems solving. As an Engineering example, infusion system is analyzed and re-designed by TRIZ. The innovative idea is generated to liberate the caretaker from the infusion bag watching out. The research in this paper shows the process of the application of TRIZ in medical device inventions. It is proved that TRIZ is an inventive methodology for problems solving and can be used widely in medical device development.

  12. 21 CFR 211.63 - Equipment design, size, and location.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 4 2014-04-01 2014-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...

  13. 21 CFR 211.63 - Equipment design, size, and location.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 4 2013-04-01 2013-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...

  14. 21 CFR 211.63 - Equipment design, size, and location.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...

  15. 21 CFR 211.63 - Equipment design, size, and location.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...

  16. 21 CFR 211.63 - Equipment design, size, and location.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 4 2012-04-01 2012-04-01 false Equipment design, size, and location. 211.63 Section 211.63 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES....63 Equipment design, size, and location. Equipment used in the manufacture, processing, packing, or...

  17. Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    The Department of Energy (DOE) has issued an Order 420.1 which establishes policy for its facilities in the event of natural phenomena hazards (NPH) along with associated NPH mitigation requirements. This DOE Standard gives design and evaluation criteria for NPH effects as guidance for implementing the NPH mitigation requirements of DOE Order 420.1 and the associated implementation Guides. These are intended to be consistent design and evaluation criteria for protection against natural phenomena hazards at DOE sites throughout the United States. The goal of these criteria is to assure that DOE facilities can withstand the effects of natural phenomena suchmore » as earthquakes, extreme winds, tornadoes, and flooding. These criteria apply to the design of new facilities and the evaluation of existing facilities. They may also be used for modification and upgrading of existing facilities as appropriate. The design and evaluation criteria presented herein control the level of conservatism introduced in the design/evaluation process such that earthquake, wind, and flood hazards are treated on a consistent basis. These criteria also employ a graded approach to ensure that the level of conservatism and rigor in design/evaluation is appropriate for facility characteristics such as importance, hazards to people on and off site, and threat to the environment. For each natural phenomena hazard covered, these criteria consist of the following: Performance Categories and target performance goals as specified in the DOE Order 420.1 NPH Implementation Guide, and DOE-STD-1 021; specified probability levels from which natural phenomena hazard loading on structures, equipment, and systems is developed; and design and evaluation procedures to evaluate response to NPH loads and criteria to assess whether or not computed response is permissible.« less

  18. Breast MRI in community practice: equipment and imaging techniques at facilities in the Breast Cancer Surveillance Consortium.

    PubMed

    DeMartini, Wendy B; Ichikawa, Laura; Yankaskas, Bonnie C; Buist, Diana; Kerlikowske, Karla; Geller, Berta; Onega, Tracy; Rosenberg, Robert D; Lehman, Constance D

    2010-11-01

    MRI is increasingly used for the detection of breast carcinoma. Little is known about breast MRI techniques among community practice facilities. The aim of this study was to evaluate equipment and acquisition techniques used by community facilities across the United States, including compliance with minimum standards by the ACRIN® 6667 Trial and the European Society of Breast Imaging. Breast Cancer Surveillance Consortium facilities performing breast MRI were identified and queried by survey regarding breast MRI equipment and technical parameters. Variables included scanner field strength, coil type, acquisition coverage, slice thickness, and the timing of the initial postcontrast sequence. Results were tallied and percentages of facilities meeting ACRIN® and European Society of Breast Imaging standards were calculated. From 23 facilities performing breast MRI, results were obtained from 14 (61%) facilities with 16 MRI scanners reporting 18 imaging parameters. Compliance with equipment recommendations of ≥1.5-T field strength was 94% and of a dedicated breast coil was 100%. Eighty-three percent of acquisitions used bilateral postcontrast techniques, and 78% used slice thickness≤3 mm. The timing of initial postcontrast sequences ranged from 58 seconds to 8 minutes 30 seconds, with 63% meeting recommendations for completion within 4 minutes. Nearly all surveyed facilities met ACRIN and European Society of Breast Imaging standards for breast MRI equipment. The majority met standards for acquisition parameters, although techniques varied, in particular for the timing of initial postcontrast imaging. Further guidelines by the ACR Breast MRI Accreditation Program will be of importance in facilitating standardized and high-quality breast MRI. Copyright © 2010 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  19. A stochastic discrete optimization model for designing container terminal facilities

    NASA Astrophysics Data System (ADS)

    Zukhruf, Febri; Frazila, Russ Bona; Burhani, Jzolanda Tsavalista

    2017-11-01

    As uncertainty essentially affect the total transportation cost, it remains important in the container terminal that incorporates several modes and transshipments process. This paper then presents a stochastic discrete optimization model for designing the container terminal, which involves the decision of facilities improvement action. The container terminal operation model is constructed by accounting the variation of demand and facilities performance. In addition, for illustrating the conflicting issue that practically raises in the terminal operation, the model also takes into account the possible increment delay of facilities due to the increasing number of equipment, especially the container truck. Those variations expectantly reflect the uncertainty issue in the container terminal operation. A Monte Carlo simulation is invoked to propagate the variations by following the observed distribution. The problem is constructed within the framework of the combinatorial optimization problem for investigating the optimal decision of facilities improvement. A new variant of glow-worm swarm optimization (GSO) is thus proposed for solving the optimization, which is rarely explored in the transportation field. The model applicability is tested by considering the actual characteristics of the container terminal.

  20. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 2 2011-10-01 2011-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  1. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  2. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 2 2012-10-01 2012-10-01 false State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  3. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  4. 45 CFR 205.170 - State standards for office space, equipment, and facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 2 2014-10-01 2012-10-01 true State standards for office space, equipment, and facilities. 205.170 Section 205.170 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN...

  5. Design and evaluation guidelines for Department of Energy facilities subjected to natural phenomena hazards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kennedy, R.P.; Short, S.A.; McDonald, J.R.

    1990-06-01

    The Department of Energy (DOE) and the DOE Natural Phenomena Hazards Panel have developed uniform design and evaluation guidelines for protection against natural phenomena hazards at DOE sites throughout the United States. The goal of the guidelines is to assure that DOE facilities can withstand the effects of natural phenomena such as earthquakes, extreme winds, tornadoes, and flooding. The guidelines apply to both new facilities (design) and existing facilities (evaluation, modification, and upgrading). The intended audience is primarily the civil/structural or mechanical engineers conducting the design or evaluation of DOE facilities. The likelihood of occurrence of natural phenomena hazards atmore » each DOE site has been evaluated by the DOE Natural Phenomena Hazard Program. Probabilistic hazard models are available for earthquake, extreme wind/tornado, and flood. Alternatively, site organizations are encouraged to develop site-specific hazard models utilizing the most recent information and techniques available. In this document, performance goals and natural hazard levels are expressed in probabilistic terms, and design and evaluation procedures are presented in deterministic terms. Design/evaluation procedures conform closely to common standard practices so that the procedures will be easily understood by most engineers. Performance goals are expressed in terms of structure or equipment damage to the extent that: (1) the facility cannot function; (2) the facility would need to be replaced; or (3) personnel are endangered. 82 refs., 12 figs., 18 tabs.« less

  6. Shuttle orbiter S-band communications equipment design evaluation

    NASA Technical Reports Server (NTRS)

    Springett, J. C.

    1979-01-01

    An assessment of S-band communication equipment includes: (1) the review and analysis of the ability of the various subsystem avionic equipment designs to interface with, and operate on signals from/to adjoining equipment; (2) the performance peculiarities of the hardware against the overall specified system requirements; and (3) the evaluation of EMC EMI test results of the various equipment with respect to the possibility of mutual interferences.

  7. 21 CFR 212.30 - What requirements must my facilities and equipment meet?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 4 2011-04-01 2011-04-01 false What requirements must my facilities and equipment meet? 212.30 Section 212.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR POSITRON EMISSION TOMOGRAPHY...

  8. 21 CFR 212.30 - What requirements must my facilities and equipment meet?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false What requirements must my facilities and equipment meet? 212.30 Section 212.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR POSITRON EMISSION TOMOGRAPHY...

  9. The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

    NASA Technical Reports Server (NTRS)

    Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.

    1988-01-01

    The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

  10. DESIGN CRITERIA FOR FUEL DISSOLUTION SYSTEMS AND ASSOCIATED SERVICE FACILITIES. PLANT MODIFICATIONS FOR REPROCESSING NON-PRODUCTION REACTOR FUELS. PROJECT CGC-830

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bierman, S.R.; Graf, W.A.; Kass, M.

    1960-07-29

    Design panameters are presented for phases of the facility to reprocess low-enrichment fuels from nonproduction reactors. Included are plant flowsheets and equipment layouts for fuel element dissolution, centrifugation, solution adjustment, and waste handling. Also included are the basic design criteria for the supporting facilities which service these phases and all other facilites located in the vicinity of the selected building (Bldg. 221-U). (J.R.D.)

  11. The relative patient costs and availability of dental services, materials and equipment in public oral care facilities in Tanzania.

    PubMed

    Nyamuryekung'e, Kasusu K; Lahti, Satu M; Tuominen, Risto J

    2015-07-01

    Patient charges and availability of dental services influence utilization of dental services. There is little available information on the cost of dental services and availability of materials and equipment in public dental facilities in Africa. This study aimed to determine the relative cost and availability of dental services, materials and equipment in public oral care facilities in Tanzania. The local factors affecting availability were also studied. A survey of all district and regional dental clinics in selected regions was conducted in 2014. A total of 28/30 facilities participated in the study. A structured interview was undertaken amongst practitioners and clinic managers within the facilities. Daily resources for consumption (DRC) were used for estimation of patients' relative cost. DRC are the quantified average financial resources required for an adult Tanzanian's overall consumption per day. Tooth extractions were found to cost four times the DRC whereas restorations were 9-10 times the DRC. Studied facilities provided tooth extractions (100%), scaling (86%), fillings (79%), root canal treatment (46%) and fabrication of removable partial dentures (32%). The ratio of tooth fillings to extractions in the facilities was 1:16. Less than 50% of the facilities had any of the investigated dental materials consistently available throughout the year, and just three facilities had all the investigated equipment functional and in use. Dental materials and equipment availability, skills of the practitioners and the cost of services all play major roles in provision and utilization of comprehensive oral care. These factors are likely to be interlinked and should be taken into consideration when studying any of the factors individually.

  12. Anthropometric Procedures for Protective Equipment Sizing and Design

    PubMed Central

    Hsiao, Hongwei

    2015-01-01

    Objectives This article presented four anthropometric theories (univariate, bivariate/probability distribution, multivariate, and shape-based methods) for protective equipment design decisions. Background While the significance of anthropometric information for product design is well recognized, designers continue to face challenges in selecting efficient anthropometric data processing methods and translating the acquired information into effective product designs. Methods For this study, 100 farm tractor operators, 3,718 respirator users, 951 firefighters, and 816 civilian workers participated in four studies on the design of tractor roll-over protective structures (ROPS), respirator test panels, fire truck cabs, and fall-arrest harnesses, respectively. Their anthropometry and participant-equipment interfaces were evaluated. Results Study 1 showed a need to extend the 90-cm vertical clearance for tractor ROPS in the current industrial standards to 98.3 to 101.3 cm. Study 2 indicated that current respirator test panel would have excluded 10% of the male firefighter population; a systematic adjustment to the boundaries of test panel cells was suggested. Study 3 provided 24 principal component analysis-based firefighter body models to facilitate fire truck cab design. Study 4 developed an improved gender-based fall-arrest harness sizing scheme to supplant the current unisex system. Conclusions This article presented four anthropometric approaches and a six-step design paradigm for ROPS, respirator test panel, fire truck cab, and fall-arrest harness applications, which demonstrated anthropometric theories and practices for defining protective equipment fit and sizing schemes. Applications The study provided a basis for equipment designers, standards writers, and industry manufacturers to advance anthropometric applications for product design and improve product efficacy. PMID:23516791

  13. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  14. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  15. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  16. 46 CFR 130.220 - Design of equipment for cooking and heating.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design of equipment for cooking and heating. 130.220 Section 130.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Miscellaneous Equipment and Systems § 130.220 Design of equipment for cooking and heating....

  17. 46 CFR 130.220 - Design of equipment for cooking and heating.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design of equipment for cooking and heating. 130.220 Section 130.220 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Miscellaneous Equipment and Systems § 130.220 Design of equipment for cooking and heating....

  18. Laboratory Animal Facilities. Laboratory Design Notes.

    ERIC Educational Resources Information Center

    Jonas, Albert M.

    1965-01-01

    Design of laboratory animal facilities must be functional. Accordingly, the designer should be aware of the complex nature of animal research and specifically the type of animal research which will be conducted in a new facility. The building of animal-care facilities in research institutions requires special knowledge in laboratory animal…

  19. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  20. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  1. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  2. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  3. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  4. 40 CFR 60.32c - Designated facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Designated facilities. 60.32c Section 60.32c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Solid Waste Landfills § 60.32c Designated facilities. (a) The designated facility to which the...

  5. Planning the School Food Service Facilities. Revised 1967.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  6. FACILITIES AND EQUIPMENT AVAILABLE FOR TEACHING SCIENCE IN PUBLIC HIGH SCHOOLS, 1958-59.

    ERIC Educational Resources Information Center

    KOELSCHE, CHARLES L.; SOLBERG, ARCHIE N.

    SURVEYS WERE CONDUCTED TO DETERMINE THE AVAILABILITY OF HIGH SCHOOL SCIENCE FACILITIES AND EQUIPMENT IN SEVEN STATES. THIS WAS ACCOMPLISHED THROUGH PERSONAL INSPECTIONS BY A PROJECT COMMITTEE, USING CHECKLISTS OF APPROXIMATELY 850 SCHOOLS SELECTED AT RANDOM. AN ANALYSIS OF THE DATA WAS THEN MADE, AND SOME GENERAL IMPLICATIONS WERE SUGGESTED.…

  7. 40 CFR 60.30d - Designated facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Designated facilities. 60.30d Section... Acid Production Units § 60.30d Designated facilities. Sulfuric acid production units. The designated facility to which §§ 60.31d and 60.32d apply is each existing “sulfuric acid production unit” as defined in...

  8. Development of an Industry Dynamometer/Spin Test Facility--Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-05-164

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDade, Mark

    2016-12-01

    The Department of Energy/National Renewable Energy Laboratory (DOE/NREL) owns and operates a megawatt-scale dynamometer used for testing wind turbine drive trains up to 1.5 megawatt (MW) in rated capacity. At this time, this unit is the only unit of its type in the United States, available for use by the American Wind Industry. Currently this dynamometer is heavily backlogged and unavailable to provide testing needed by various wind industry members. DOE/NREL is in possession of two critical pieces of equipment that may be used to develop an alternative Dynamometer facility, but does not have the funds or other resources necessarymore » to develop such a facility. The Participant possesses complimentary facilities and infrastructure that when combined with the NREL equipment can create such a test facility. The Participant is also committed to expending funds to develop and operate such a facility to the subsequent benefit of the Wind Industry and DOE Wind Energy program. In exchange for DOE/NREL providing the critical equipment, the Participant will grant DOE/NREL a minimum of 90 days of testing time per year in the new facility while incurring no facilities fees.« less

  9. Adhesive bonded structural repair. II - Surface preparation procedures, tools, equipment and facilities

    NASA Astrophysics Data System (ADS)

    Wegman, Raymond F.; Tullos, Thomas R.

    1993-10-01

    A development status report is presented on the surface preparation procedures, tools, equipment, and facilities used in adhesively-bonded repair of aerospace and similar high-performance structures. These methods extend to both metallic and polymeric surfaces. Attention is given to the phos-anodize containment system, paint removal processes, tools for cutting composite prepreg and fabric materials, autoclaves, curing ovens, vacuum bagging, and controlled atmospheres.

  10. 40 CFR 60.480 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart. (c) Addition or replacement of equipment for the purpose of process improvement which is... all equipment (defined in § 60.481) within a process unit is an affected facility. (b) Any affected... the definition of “process unit” in § 60.481 and the requirements in § 60.482-1(g) of this subpart...

  11. Dance Facilities.

    ERIC Educational Resources Information Center

    Ashton, Dudley, Ed.; Irey, Charlotte, Ed.

    This booklet represents an effort to assist teachers and administrators in the professional planning of dance facilities and equipment. Three chapters present the history of dance facilities, provide recommended dance facilities and equipment, and offer some adaptations of dance facilities and equipment, for elementary, secondary and college level…

  12. Shuttle orbiter S-band payload communications equipment design evaluation

    NASA Technical Reports Server (NTRS)

    Springett, J. C.; Maronde, R. G.

    1979-01-01

    The analysis of the design, and the performance assessment of the Orbiter S-band communication equipment are reported. The equipment considered include: network transponder, network signal processor, FM transmitter, FM signal processor, payload interrogator, and payload signal processor.

  13. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  14. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  15. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  16. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  17. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Lithium Isotope Separation Facilities... Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's Export Licensing Authority a. Facilities or plants for the separation of lithium isotopes. b...

  18. Design of EPON far-end equipment based on FTTH

    NASA Astrophysics Data System (ADS)

    Feng, Xiancheng; Yun, Xiang

    2008-12-01

    Now, most favors fiber access is mainly the EPON fiber access system. Inheriting from the low cost of Ethernet, usability and bandwidth of optical network, EPON technology is one of the best technologies in fiber access and is adopted by the carriers all over the world widely. According to the scheme analysis to FTTH fan-end equipment, hardware design of ONU is proposed in this paper. The FTTH far-end equipment software design deference modulation design concept, it divides the software designment into 5 function modules: the module of low-layer driver, the module of system management, the module of master/slave communication, and the module of main/Standby switch and the module of command line. The software flow of the host computer is also analyzed. Finally, test is made for Ethernet service performance of FTTH far-end equipment, E1 service performance and the optical path protection switching, and so on. The results of test indicates that all the items are accordance with technical request of far-end ONU equipment and possess good quality and fully reach the requirement of telecommunication level equipment. The far-end equipment of FTTH divides into several parts based on the function: the control module, the exchange module, the UNI interface module, the ONU module, the EPON interface module, the network management debugging module, the voice processing module, the circuit simulation module, the CATV module. In the downstream direction, under the protect condition, we design 2 optical modules. The system can set one group optical module working and another group optical module closure when it is initialized. When the optical fiber line is cut off, the LOS warning comes out. It will cause MUX to replace another group optical module, simultaneously will reset module 3701/3711 and will make it again test the distance, and will give the plug board MPC850 report through the GPIO port. During normal mode, the downstream optical signal is transformed into the

  19. Space station wardroom habitability and equipment study

    NASA Technical Reports Server (NTRS)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  20. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline...

  1. 40 CFR 60.590 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or replacement of equipment (defined in § 60.591) for the purpose of process improvement which is... in § 60.591) within a process unit is an affected facility. (b) Any affected facility under paragraph... “process unit” in § 60.590 of this subpart until the EPA takes final action to require compliance and...

  2. 47 CFR 2.937 - Equipment defect and/or design change.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Equipment defect and/or design change. 2.937 Section 2.937 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY ALLOCATIONS AND RADIO TREATY MATTERS; GENERAL RULES AND REGULATIONS Equipment Authorization Procedures Conditions Attendant to An Equipment Authorization § 2.937...

  3. A Design for an Orbital Assembly Facility for Complex Missions

    NASA Astrophysics Data System (ADS)

    Feast, S.; Bond, A.

    A design is presented for an Operations Base Station (OBS) in low earth orbit that will function as an integral part of a space transportation system, enabling assembly and maintenance of a Cis-Lunar transportation infrastructure and integration of vehicles for other high energy space missions to be carried out. Construction of the OBS assumes the use of the SKYLON Single-Stage-to-Orbit (SSTO) spaceplane, which imposes design and assembly constraints due to its payload mass limits and payload bay dimensions. It is assumed that the space transport infrastructure and high mission energy vehicles would also make use of SKYLON to deploy standard transport equipment and stages bound by these same constraints. The OBS is therefore a highly modular arrangement, incorporating some of these other vehicle system elements in its layout design. Architecturally, the facilities of the OBS are centred around the Assembly Dock which is in the form of a large cylindrical spaceframe structure with two large doors on either end incorporating a skin of aluminised Mylar to enclose the dock. Longitudinal rails provide internal tether attachments to anchor vehicles and components while manipulators are used for the handling and assembling of vehicle structures. The exterior of the OBS houses the habitation modules for workforce and vehicle crews along with propellant farms and other operational facilities.

  4. [Design of medical equipment service management system].

    PubMed

    Jiang, Youhao; PengWen; Jiang, Ningfeng; Ma, Li; Kong, Lingwei; Yin, PeiHao; Sun, Cheng

    2012-09-01

    To develop a maintenance management system for medical equipment based on HIS. The system contains some special functions( including preventive maintenance, automatic job dispatch, performance assessment, etc.) which are very useful for confirming the medical equipment in proper conditions and promoting the working efficiency of the staff. The system provides technical support for the improvement of the maintenance management level. The system, completed the software design using C/S, B/S combination mode. The system realized clients of various sections of zero maintenance, and make the data manipulation, statistical features of equipment management department more convenient. the system connects the subsystems closer and interacts information from time to time, forming a tight network structure. This provides a basis for future hospital-wide information integration.

  5. A research program to reduce interior noise in general aviation airplanes. Design of an acoustic panel test facility

    NASA Technical Reports Server (NTRS)

    Roskam, J.; Muirhead, V. U.; Smith, H. W.; Henderson, T. D.

    1977-01-01

    The design, construction, and costs of a test facility for determining the sound transmission loss characteristics of various panels and panel treatments are described. The pressurization system and electronic equipment used in experimental testing are discussed as well as the reliability of the facility and the data gathered. Tests results are compared to pertinent acoustical theories for panel behavior and minor anomalies in the data are examined. A method for predicting panel behavior in the stiffness region is also presented.

  6. 40 CFR 60.5401 - What are the exceptions to the equipment leak standards for affected facilities at onshore...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment leak standards for affected facilities at onshore natural gas processing plants? 60.5401 Section... for affected facilities at onshore natural gas processing plants? (a) You may comply with the... is detected. (4)(i) Any pressure relief device that is located in a nonfractionating plant that is...

  7. 40 CFR 60.5401 - What are the exceptions to the equipment leak standards for affected facilities at onshore...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment leak standards for affected facilities at onshore natural gas processing plants? 60.5401 Section... for affected facilities at onshore natural gas processing plants? (a) You may comply with the... is detected. (4)(i) Any pressure relief device that is located in a nonfractionating plant that is...

  8. An inventory of aeronautical ground research facilities. Volume 4: Engineering flight simulation facilities

    NASA Technical Reports Server (NTRS)

    Pirrello, C. J.; Hardin, R. D.; Capelluro, L. P.; Harrison, W. D.

    1971-01-01

    The general purpose capabilities of government and industry in the area of real time engineering flight simulation are discussed. The information covers computer equipment, visual systems, crew stations, and motion systems, along with brief statements of facility capabilities. Facility construction and typical operational costs are included where available. The facilities provide for economical and safe solutions to vehicle design, performance, control, and flying qualities problems of manned and unmanned flight systems.

  9. Qualification of safety-related electrical equipment in France. Methods, approach and test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raimondo, E.; Capman, J.L.; Herovard, M.

    1985-05-01

    Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less

  10. Facility design, construction, and operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less

  11. Space Station Furnace Facility Core. Requirements definition and conceptual design study. Volume 2: Technical report. Appendix 6: Technical summary reports

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. The facility is designed to support a complement of furnace modules as outlined in the Science Capabilities Requirements Document (SCRD). The SSFF is a three rack facility that provides the functions, interfaces, and equipment necessary for the processing of the furnaces and consists of two main parts: the SSFF Core Rack and the two Experiment Racks. The facility is designed to accommodate two experimenter-provided furnace modules housed within the two experiment racks, and is designed to operate these two furnace modules simultaneously. The SCRD specifies a wide range of furnace requirements and serves as the basis for the SSFF conceptual design. SSFF will support automated processing during the man-tended operations and is also designed for crew interface during the permanently manned configuration. The facility is modular in design and facilitates changes as required, so the SSFF is adept to modifications, maintenance, reconfiguration, and technology evolution.

  12. [A design of software for management of hospital equipment maintenance process].

    PubMed

    Xie, Haiyuan; Liu, Yiqing

    2010-03-01

    According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.

  13. Dual-Spool Turbine Facility Design Overview

    NASA Technical Reports Server (NTRS)

    Giel, Paul; Pachlhofer, Pete

    2003-01-01

    The next generation of aircraft engines, both commercial and military, will attempt to capitalize on the benefits of close-coupled, vaneless, counter-rotating turbine systems. Experience has shown that significant risks and challenges are present with close-coupled systems in terms of efficiency and durability. The UEET program needs to demonstrate aerodynamic loading and efficiency goals for close-coupled, reduced-stage HP/LP turbine systems as a Level 1 Milestone for FY05. No research facility exists in the U.S. to provide risk reduction for successful development of close-coupled, high and low pressure turbine systems for the next generations of engines. To meet these objectives, the design, construction, and integrated systems testing of a Dual-Spool Turbine Facility (DSTF) facility has been initiated at the NASA Glenn Research Center. The facility will be a warm (-IOOO'F), continuous flow facility for overall aerodynamic performance and detailed flow field measurement acquisition. The facility will have state-of-the-art instrumentation to capture flow physics details. Accurate and reliable speed control will be achieved by utilizing the existing Variable Frequency Drive System. Utilization of this and other existing GRC centralized utilities will reduce the overall construction costs. The design allows for future installation of a turbine inlet combustor profile simulator. This presentation details the objectives of the facility and the concepts used in specifying its capabilities. Some preliminary design results will be presented along with a discussion of plans and schedules.

  14. On-orbit technology experiment facility definition

    NASA Technical Reports Server (NTRS)

    Russell, Richard A.; Buchan, Robert W.; Gates, Richard M.

    1988-01-01

    A study was conducted to identify on-orbit integrated facility needs to support in-space technology experiments on the Space Station and associated free flyers. In particular, the first task was to examine the proposed technology development missions (TDMX's) from the model mission set and other proposed experimental facilities, both individually and by theme, to determine how and if the experiments might be combined, what equipment might be shared, what equipment might be used as generic equipment for continued experimentation, and what experiments will conflict with the conduct of other experiments or Space Station operations. Then using these results, to determine on-orbit facility needs to optimize the implementation of technology payloads. Finally, to develop one or more scenarios, design concepts, and outfitting requirements for implementation of onboard technology experiments.

  15. OFFICE EQUIPMENT: DESIGN, INDOOR AIR EMISSIONS, AND POLLUTION PREVENTION OPPORTUNITIES

    EPA Science Inventory

    The report summarizes available information on office equipment design; indoor air emissions of organics, ozone, and particulates from office equipment; and pollution prevention approaches for reducing these emissions. Since much of the existing emissions data from office equipme...

  16. Maintenance Training Equipment: Design Specification Based on Instructional System Development. Revision

    DTIC Science & Technology

    1984-12-01

    model pr, vides a method for communicating a specific training equipment design to the procurement office after A"~- ISD ana lysis has est~blished a...maintenance trainer has been identified. The model provides a method by which a training equipment design can be communicated to the System Project Office...ensure * ase of development of procurement specifications and consistency between different documented designs. A completed application of this maodel

  17. 46 CFR 130.220 - Design of equipment for cooking and heating.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Design of equipment for cooking and heating. 130.220... Design of equipment for cooking and heating. (a) Doors on each cooking appliance must be provided with heavy-duty hinges and locking-devices to prevent accidental opening in heavy weather. (b) Each cooking...

  18. A basic guide to overlay design using nondestructive testing equipment data

    NASA Astrophysics Data System (ADS)

    Turner, Vernon R.

    1990-08-01

    The purpose of this paper is to provide a basic and concise guide to designing asphalt concrete (AC) overlays over existing AC pavements. The basis for these designs is deflection data obtained from nondestructive testing (NDT) equipment. This data is used in design procedures which produce required overlay thickness or an estimate of remaining pavement life. This guide enables one to design overlays or better monitor the designs being performed by others. This paper will discuss three types of NDT equipment, the Asphalt Institute Overlay Designs by Deflection Analysis and by the effective thickness method as well as a method of estimating remaining pavement life, correlations between NDT equipment and recent correlations in Washington State. Asphalt overlays provide one of the most cost effective methods of improving existing pavements. Asphalt overlays can be used to strengthen existing pavements, to reduce maintenance costs, to increase pavement life, to provide a smoother ride, and to improve skid resistance.

  19. 7 CFR 58.406 - Starter facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... precaution shall be taken to prevent contamination of the facility, equipment and the air therein. A filtered air supply with a minimum average efficiency of 90 percent when tested in accordance with the ASHRAE....406 Starter facility. A separate starter room or properly designed starter tanks and satisfactory air...

  20. Hyperbaric Chamber Equipment: A Consolidated Equipment List from Selected Multiplace Hyperbaric Facilities.

    DTIC Science & Technology

    1983-12-01

    carbon dioxide scrubbers , air conditioning, communications, lighting, and fire detecting and fire extinguishing systems. Medical support equipment was...10 14 Humidity...............................11 5. Hydrocarb on...........................11 B. Carbon Dioxide Scrubbers .....................11 C...and ancillary equipment included gas/vapor monitoring equipment, carbon dioxide scrubbers , air conditioning, communications, lighting, and fire

  1. Interior design for ambulatory care facilities: how to reduce stress and anxiety in patients and families.

    PubMed

    Frasca-Beaulieu, K

    1999-01-01

    The following article illustrates some important factors to consider when designing ambulatory care facilities (ACFs), and focuses on how wayfinding, noise control, privacy, security, color and lighting, general ambience, textures, and nature can have a profound influence on patient and family stress, consumer satisfaction, health and well-being. Other important design issues: convenience and accessibility, accommodation to various populations, consumer and family focus, patient education, image, as well as current equipment needs and future growth are examined in light of the prevailing trends in health care delivery. In sum, this feature explores the important stress-reducing and health-promoting elements involved in successful ACF design.

  2. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  3. Water immersion facility general description, spacecraft design division, crew station branch

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The Water Immersion Facility provides an accurate, safe, neutral buoyancy simulation of zero gravity conditions for development of equipment and procedures, and the training of crews. A detailed description is given of some of the following systems: (1) water tank and support equipment; (2) communications systems; (3) environmental control and liquid cooled garment system (EcS/LCG); (4) closed circuit television system; and (5) medical support system.

  4. 77 FR 6915 - Medical Diagnostic Equipment Accessibility Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... Israel Deaconess Medical Center (October 22, 2009) accessible facilities and accessible medical equipment... of types of accessible medical equipment required in different types of health care facilities. If... facilities, accessible medical equipment, and auxiliary aids and services; University of Southern California...

  5. PLANNING THE INDOOR PHYSICAL EDUCATION FACILITIES.

    ERIC Educational Resources Information Center

    HASE, GERALD J.; HICK, BASIL L.

    THIS PAMPHLET IS DESIGNED TO HELP ARCHITECTS AND LOCAL SCHOOL OFFICIALS IN THE PREPARATION OF PLANS FOR PHYSICAL EDUCATION FACILITIES IN NEW AND EXISTING BUILDINGS. FACILITIES MENTIONED INCLUDE--(1) GYMNASIUM, (2) SWIMMING POOL, (3) SMALL GROUP ACTIVITY ROOM, (4) DRESSING AND SHOWERING ROOMS, (5) TEAM ROOM, (6) EQUIPMENT DRYING ROOM, (7) LAUNDRY…

  6. Normal accidents: human error and medical equipment design.

    PubMed

    Dain, Steven

    2002-01-01

    High-risk systems, which are typical of our technologically complex era, include not just nuclear power plants but also hospitals, anesthesia systems, and the practice of medicine and perfusion. In high-risk systems, no matter how effective safety devices are, some types of accidents are inevitable because the system's complexity leads to multiple and unexpected interactions. It is important for healthcare providers to apply a risk assessment and management process to decisions involving new equipment and procedures or staffing matters in order to minimize the residual risks of latent errors, which are amenable to correction because of the large window of opportunity for their detection. This article provides an introduction to basic risk management and error theory principles and examines ways in which they can be applied to reduce and mitigate the inevitable human errors that accompany high-risk systems. The article also discusses "human factor engineering" (HFE), the process which is used to design equipment/ human interfaces in order to mitigate design errors. The HFE process involves interaction between designers and endusers to produce a series of continuous refinements that are incorporated into the final product. The article also examines common design problems encountered in the operating room that may predispose operators to commit errors resulting in harm to the patient. While recognizing that errors and accidents are unavoidable, organizations that function within a high-risk system must adopt a "safety culture" that anticipates problems and acts aggressively through an anonymous, "blameless" reporting mechanism to resolve them. We must continuously examine and improve the design of equipment and procedures, personnel, supplies and materials, and the environment in which we work to reduce error and minimize its effects. Healthcare providers must take a leading role in the day-to-day management of the "Perioperative System" and be a role model in

  7. Crew factors in the design of the Space Station

    NASA Technical Reports Server (NTRS)

    Robinson, Judith L.

    1987-01-01

    The designing of Space Shuttle modules and equipment in order to provide a stimulating and efficient work atmosphere and a pleasant living environment is examined. The habitation module for the eight crew members is divided into four areas: ceiling, floor, port, and starboard. The module is to consist of crew quarters, a wardroom, a galley, a personal hygiene facility, a health maintenance facility, and stowage areas. There is a correlation between the function of the module and its location; for example the galley will be near the wardroom and the personal hygiene facility near the crew quarters. The designs of the equipment for crew accommodation and of the equipment to be maintained and repaired by the crew will be standarized. The design and functions of the crew and equipment restraints, crew mobility aids, racks to contain equipment, and functional units are described.

  8. Fluid dynamics simulation for design on sludge drying equipment

    NASA Astrophysics Data System (ADS)

    Li, Shuiping; Liang, Wang; Kai, Zhang

    2017-10-01

    Sludge drying equipment is a key component in the sludge drying disposal, the structure of drying equipment directly affects the drying disposal of the sludge, so it is necessary to analyse the performance of the drying equipment with different structure. Fluent software can be very convenient to get the distribution of the flow field and temperature field inside the drying equipment which reflects the performance of the structure. In this paper, the outlet position of the sludge and the shape of the sludge inlet are designed. The geometrical model of the drying equipment is established by using pre-processing software Gambit, and the meshing of the model is carried out. The Eulerian model is used to simulate the flow of each phase and the interaction between them, and the realizable turbulence model is used to simulate the turbulence of each phase. Finally, the simulation results of the scheme are compared and the optimal structure scheme is obtained, the operational requirement is proposed. The CFD theory provides a reliable basis for the drying equipment research and reduces the time and costs of the research.

  9. Gravitational Biology Facility on Space Station: Meeting the needs of space biology

    NASA Technical Reports Server (NTRS)

    Allen, Katherine; Wade, Charles

    1992-01-01

    The Gravitational Biology Facility (GBF) is a set of generic laboratory equipment needed to conduct research on Space Station Freedom (SSF), focusing on Space Biology Program science (Cell and Developmental Biology and Plant Biology). The GBF will be functional from the earliest utilization flights through the permanent manned phase. Gravitational biology research will also make use of other Life Sciences equipment on the space station as well as existing equipment developed for the space shuttle. The facility equipment will be developed based on requirements derived from experiments proposed by the scientific community to address critical questions in the Space Biology Program. This requires that the facility have the ability to house a wide variety of species, various methods of observation, and numerous methods of sample collection, preservation, and storage. The selection of the equipment will be done by the members of a scientific working group (5 members representing cell biology, 6 developmental biology, and 6 plant biology) who also provide requirements to design engineers to ensure that the equipment will meet scientific needs. All equipment will undergo extensive ground based experimental validation studies by various investigators addressing a variety of experimental questions. Equipment will be designed to be adaptable to other space platforms. The theme of the Gravitational Biology Facility effort is to provide optimal and reliable equipment to answer the critical questions in Space Biology as to the effects of gravity on living systems.

  10. Science Facilities Design Guidelines.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…

  11. The stem cell laboratory: design, equipment, and oversight.

    PubMed

    Wesselschmidt, Robin L; Schwartz, Philip H

    2011-01-01

    This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources.

  12. Planning and Equipping Industrial Arts Facilities.

    ERIC Educational Resources Information Center

    Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.

    Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…

  13. Zeitgeists and development trends in long-term care facility design.

    PubMed

    Wang, Chia-Hui; Kuo, Nai-Wen

    2006-06-01

    Through literature analysis, in-depth interviews, and the application of the Delphi survey, this study explored long-term care resident priorities with regard to long-term care facility design in terms of both physical and psychological needs. This study further clarified changing trends in long-term care concepts; illustrated the impact that such changes are having on long-term care facility design; and summarized zeitgeists related to the architectural design of long-term care facilities. Results of our Delphi survey indicated the following top five priorities in long-term care facility design: (1) creating a home-like feeling; (2) adhering to Universal Design concepts; (3) providing well-defined private sleeping areas; (4) providing adequate social space; and (5) decentralizing residents' rooms into clusters. The three major zeitgeists related to long-term care facility design include: (1) modern long-term care facilities should abandon their traditional "hospital" image and gradually reposition facilities into homelike settings; (2) institution-based care for the elderly should be de-institutionalized under the concept of aging-in-place; and (3) living clusters, rather than traditional hospital-like wards, should be designed into long-term care facilities.

  14. Risk Management Technique for design and operation of facilities and equipment

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  15. UOE Pipe Manufacturing Process Simulation: Equipment Designing and Construction

    NASA Astrophysics Data System (ADS)

    Delistoian, Dmitri; Chirchor, Mihael

    2017-12-01

    UOE pipe manufacturing process influence directly on pipeline resilience and operation capacity. At present most spreaded pipe manufacturing method is UOE. This method is based on cold forming. After each technological step appears a certain stress and strain level. For pipe stress strain study is designed and constructed special equipment that simulate entire technological process.UOE pipe equipment is dedicated for manufacturing of longitudinally submerged arc welded DN 400 (16 inch) steel pipe.

  16. Lunar base launch and landing facilities conceptual design

    NASA Technical Reports Server (NTRS)

    Phillips, Paul G.; Simonds, Charles H.; Stump, William R.

    1992-01-01

    The purpose of this study was to perform a first look at the requirements for launch and landing facilities for early lunar bases and to prepared conceptual designs for some of these facilities. The emphasis of the study is on the facilities needed from the first manned landing until permanent occupancy, the Phase 2 lunar base. Factors including surface characteristics, navigation system, engine blast effects, and expected surface operations are used to develop landing pad designs, and definitions fo various other elements of the launch and landing facilities. Finally, the dependence of the use of these elements and the evolution of the facilities are established.

  17. New NREL Research Facility Slashes Energy Use by 66 Percent

    Science.gov Websites

    Thermal Test Facility, which serves as a showcase of energy-saving features and the home of NREL's cutting technologies now being developed at the Thermal Test Facility will help us reach this goal." The facility energy-efficient building design, NREL's Thermal Test Facility houses sophisticated equipment for

  18. Robot Would Reconfigure Modular Equipment

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R.

    1993-01-01

    Special-purpose sets of equipment, packaged in identical modules with identical interconnecting mechanisms, attached to or detached from each other by specially designed robot, according to proposal. Two-arm walking robot connects and disconnects modules, operating either autonomously or under remote supervision. Robot walks along row of connected modules by grasping successive attachment subassemblies in hand-over-hand motion. Intended application for facility or station in outer space; robot reconfiguration scheme makes it unnecessary for astronauts to venture outside spacecraft or space station. Concept proves useful on Earth in assembly, disassembly, or reconfiguration of equipment in such hostile environments as underwater, near active volcanoes, or in industrial process streams.

  19. NETL's Hybrid Performance, or Hyper, facility

    ScienceCinema

    None

    2018-02-13

    NETL's Hybrid Performance, or Hyper, facility is a one-of-a-kind laboratory built to develop control strategies for the reliable operation of fuel cell/turbine hybrids and enable the simulation, design, and implementation of commercial equipment. The Hyper facility provides a unique opportunity for researchers to explore issues related to coupling fuel cell and gas turbine technologies.

  20. The interaction of facility design with management goals.

    PubMed

    Lindeman, W E

    1991-01-01

    While medical groups have different goals based on their mission, size and market, they all seek to propagate and maintain a financially sound enterprise. Author William Lindeman, AIA, writes that a primary factor in achieving this goal is excellent facility design. While facility design is no guarantee for success, exceptionally poor design can make success all but impossible.

  1. Design of Aircraft Deicing Facilities

    DOT National Transportation Integrated Search

    1993-08-23

    Archival copy of original Federal Aviation Administration standards and : specifications for use in the design of aircraft deicing facilities. To ensure : review of all changes, user should consult . ...

  2. Conceptual design of a biological specimen holding facility. [Life Science Laboratory for Space Shuttle

    NASA Technical Reports Server (NTRS)

    Jackson, J. K.; Yakut, M. M.

    1976-01-01

    An all-important first step in the development of the Spacelab Life Science Laboratory is the design of the Biological Specimen Holding Facility (BSHF) which will provide accommodation for living specimens for life science research in orbit. As a useful tool in the understanding of physiological and biomedical changes produced in the weightless environment, the BSHF will enable biomedical researchers to conduct in-orbit investigations utilizing techniques that may be impossible to perform on human subjects. The results of a comprehensive study for defining the BSHF, description of its experiment support capabilities, and the planning required for its development are presented. Conceptual designs of the facility, its subsystems and interfaces with the Orbiter and Spacelab are included. Environmental control, life support and data management systems are provided. Interface and support equipment required for specimen transfer, surgical research, and food, water and waste storage is defined. New and optimized concepts are presented for waste collection, feces and urine separation and sampling, environmental control, feeding and watering, lighting, data management and other support subsystems.

  3. 78 FR 19541 - Proposed Revision to Design of Structures, Components, Equipment and Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0041] Proposed Revision to Design of Structures, Components, Equipment and Systems AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft..., ``Design of Structures, Components, Equipment, and Systems;'' and the request for comment on NUREG-0800...

  4. JPL Facilities and Software for Collaborative Design: 1994 - Present

    NASA Technical Reports Server (NTRS)

    DeFlorio, Paul A.

    2004-01-01

    The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

  5. Design Standards for School Art Facilities

    ERIC Educational Resources Information Center

    National Art Education Association, 2015

    2015-01-01

    "Design Standards for School Art Facilities" is an invaluable resource for any school or school district looking to build new facilities for the visual arts or renovate existing ones. Discover detailed information about spaces for the breadth of media used in the visual arts. Photographs illustrate all types of features including…

  6. The Stem Cell Laboratory: Design, Equipment, and Oversight

    PubMed Central

    Wesselschmidt, Robin L.; Schwartz, Philip H.

    2013-01-01

    This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources. PMID:21822863

  7. Ultraviolet Free Electron Laser Facility preliminary design report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ben-Zvi, I.

    1993-02-01

    This document, the Preliminary Design Report (PDR) for the Brookhaven Ultraviolet Free Electron Laser (UV FEL) facility, describes all the elements of a facility proposed to meet the needs of a research community which requires ultraviolet sources not currently available as laboratory based lasers. Further, for these experiments, the requisite properties are not extant in either the existing second or upcoming third generation synchrotron light sources. This document is the result of our effort at BNL to identify potential users, determine the requirements of their experiments, and to design a facility which can not only satisfy the existing need, butmore » have adequate flexibility for possible future extensions as need dictates and as evolving technology allows. The PDR is comprised of three volumes. In this, the first volume, background for the development of the proposal is given, including descriptions of the UV FEL facility, and representative examples of the science it was designed to perform. Discussion of the limitations and potential directions for growth are also included. A detailed description of the facility design is then provided, which addresses the accelerator, optical, and experimental systems. Information regarding the conventional construction for the facility is contained in an addendum to volume one (IA).« less

  8. Mission Peculiar Equipment (MPE) For Spacelab Mission 1 Payload

    NASA Astrophysics Data System (ADS)

    Sims, John H.; Dodeck, Hauke

    1982-02-01

    Spacelab interfaces and services for payloads are advertised in the Spacelab Payload Accommodations Handbook (SPAH). These accommodations are available to the total payload and must be managed and apportioned by a payload integrator. A major part of the integration task is satisfying all instruments/facilities servicing requirements which vary with each item of payload equipment and, when totalled, sometimes exceed the capabilities as defined in SPAH. Such a determination is an output of the integrated payload design and integration effort which consists of analytical assessments based on individual payload equipment requirements inputs, STS and Spacelab available accommodations and constraints, and programmatic considerations. This systems engineering activity spans all engineering disciplines, assesses the module and pallet layouts and simultaneous operation of instrument/facility combinations, and requires a detailed knowledge of the Spacelab design. Introduction of a broad range of payload integrator-provided Mission Peculiar Equipment (MPE) into the Spacelab Mission 1 payload complement was necessary to be added to the Spacelab provisions in order to satisfy the interface and service requirements for each payload developer. This paper provides insight into various aspects of this MPE; including why it is needed, driving design considerations, design and development problems, and conclusions and recommendations for the future. MPE identified for Spacelab Mission 1 begins an inventory that will continue to expand as other mission requirements are identified and the Spacelab flight frequency increases.

  9. Facilities for music education and their acoustical design.

    PubMed

    Koskinen, Heli; Toppila, Esko; Olkinuora, Pekka

    2010-01-01

    Good rehearsal facilities for musicians are essential. Directive 2003/10/EC necessitates that musicians are protected from noise exposure. A code of conduct gives the guidelines how this should be done. This study examines room acoustics recommendations provided by the Finnish code of conduct, and discusses whether they are adequate. Small teaching facilities were measured after renovation and compared to earlier measurements. Teachers' opinions were inquired about the facilities before and after. The renovation did not decrease the noise exposure of the teachers. However, the majority preferred the facilities after the renovation. The Finnish code of conduct is not sufficient for facilities where loud instruments are played, or band practise. Good facilities can be designed but they must be specified at the designing stage for their intended use.

  10. FAST FLUX TEST FACILITY CONCEPTUAL FACILTY DESIGN DESCRIPTION FOR THE INERT GAS CELL EXAMINATION FACILITY NO. 71

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1968-12-12

    The purpose of this Conceptual Facility Design Description (CFDD) is to provide a technical description of the Inert Gas Cell Examination Facility such that agreement with RDT on a Conceptual Design can be reached . The CFDD also serves to establish a common understanding of the facility concept among all responsible FFTF Project parties including the Architect Engineer and Reactor Designer. Included are functions and design requirements, a physical description of the facility, safety considerations, principles of operation, and maintenance principles.

  11. The Influence of Building Codes on Recreation Facility Design.

    ERIC Educational Resources Information Center

    Morrison, Thomas A.

    1989-01-01

    Implications of building codes upon design and construction of recreation facilities are investigated (national building codes, recreation facility standards, and misperceptions of design requirements). Recreation professionals can influence architectural designers to correct past deficiencies, but they must understand architectural and…

  12. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.488 Design and... 46 Shipping 5 2010-10-01 2010-10-01 false Design and equipment for tanks carrying high melting point NLSs: Category B. 153.488 Section 153.488 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY...

  13. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.488 Design and... 46 Shipping 5 2014-10-01 2014-10-01 false Design and equipment for tanks carrying high melting point NLSs: Category B. 153.488 Section 153.488 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY...

  14. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.488 Design and... 46 Shipping 5 2013-10-01 2013-10-01 false Design and equipment for tanks carrying high melting point NLSs: Category B. 153.488 Section 153.488 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY...

  15. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.488 Design and... 46 Shipping 5 2012-10-01 2012-10-01 false Design and equipment for tanks carrying high melting point NLSs: Category B. 153.488 Section 153.488 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY...

  16. 46 CFR 153.488 - Design and equipment for tanks carrying high melting point NLSs: Category B.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.488 Design and... 46 Shipping 5 2011-10-01 2011-10-01 false Design and equipment for tanks carrying high melting point NLSs: Category B. 153.488 Section 153.488 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY...

  17. 48 CFR 252.239-7011 - Special construction and equipment charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the Contractor stops using facilities or equipment which the Government has, in whole or part... equipment attributable to the Government's contribution. Determine the value of the facilities and equipment...— (1) Recurring charges for the services, facilities, and equipment do not include in the rate base any...

  18. Biomedical equipment and medical services in India.

    PubMed

    Sahay, K B; Saxena, R K

    Varieties of Biomedical Equipment (BME) are now used for quick diagnosis, flawless surgery and therapeutics etc. Use of a malfunctioning BME could result in faulty diagnosis and wrong treatment and can lead to damaging or even devastating aftermath. Modern Biomedical Equipments inevitably employ highly sophisticated technology and use complex systems and instrumentation for best results. To the best of our knowledge the medical education in India does not impart any knowledge on the theory and design of BME and it is perhaps not possible also. Hence there is need for a permanent mechanism which can maintain and repair the biomedical equipments routinely before use and this can be done only with the help of qualified Clinical Engineers. Thus there is a genuine need for well organized cadre of Clinical Engineers who would be persons with engineering background with specialization in medical instrumentation. These Clinical engineers should be made responsible for the maintenance and proper functioning of BME. Every hospital or group of hospitals in the advanced countries has a clinical engineering unit that takes care of the biomedical equipments and systems in the hospital by undertaking routine and preventive maintenance, regular calibration of equipments and their timely repairs. Clinical engineers should be thus made an essential part of modern health care system and services. Unfortunately such facilities and mechanism do not exist in India. To make BME maintenance efficient and flawless in India, study suggests following measures and remedies: (i) design and development of comprehensive computerized database for BME (ii) cadre of Clinical engineers (iii) online maintenance facility and (iv) farsighted managerial skill to maximize accuracy, functioning and cost effectiveness.

  19. Food Service Equipment. Third Edition.

    ERIC Educational Resources Information Center

    Jernigan, Anna Katherine; Ross, Lynne Nannen

    This book provides information that will help in purchasing the kind of food service equipment most useful in any given facility. Hence, it should be of value to architects, contractors, administrators, dietitians, managers, and others involved in remodeling a facility, replacing equipment, and/or improving the efficiency of food service…

  20. Modern tornado design of nuclear and other potentially hazardous facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevenson, J.D.; Zhao, Y.

    Tornado wind loads and other tornado phenomena, including tornado missiles and differential pressure effects, have not usually been considered in the design of conventional industrial, commercial, or residential facilities in the United States; however, tornado resistance has often become a design requirement for certain hazardous facilities, such as large nuclear power plants and nuclear materials and waste storage facilities, as well as large liquefied natural gas storage facilities. This article provides a review of current procedures for the design of hazardous industrial facilities to resist tornado effects. 23 refs., 19 figs., 13 tabs.

  1. Mixed Oxide Fresh Fuel Package Auxiliary Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yapuncich, F.; Ross, A.; Clark, R.H.

    2008-07-01

    The United States Department of Energy's National Nuclear Security Administration (NNSA) is overseeing the construction the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) on the Savannah River Site. The new facility, being constructed by NNSA's contractor Shaw AREVA MOX Services, will fabricate fuel assemblies utilizing surplus plutonium as feedstock. The fuel will be used in designated commercial nuclear reactors. The MOX Fresh Fuel Package (MFFP), which has recently been licensed by the Nuclear Regulatory Commission (NRC) as a type B package (USA/9295/B(U)F-96), will be utilized to transport the fabricated fuel assemblies from the MFFF to the nuclear reactors. It wasmore » necessary to develop auxiliary equipment that would be able to efficiently handle the high precision fuel assemblies. Also, the physical constraints of the MFFF and the nuclear power plants require that the equipment be capable of loading and unloading the fuel assemblies both vertically and horizontally. The ability to reconfigure the load/unload evolution builds in a large degree of flexibility for the MFFP for the handling of many types of both fuel and non fuel payloads. The design and analysis met various technical specifications including dynamic and static seismic criteria. The fabrication was completed by three major fabrication facilities within the United States. The testing was conducted by Sandia National Laboratories. The unique design specifications and successful testing sequences will be discussed. (authors)« less

  2. Catalog of Uncommon Facilities in Western Colleges and Universities.

    ERIC Educational Resources Information Center

    Viehland, Dennis, Comp.

    A list of rare, and often unique, facilities in the western part of the United States is presented that is designed to serve as a resource for researchers. The list of facilities is a guide to what uncommon equipment, centers or institutes, and collections are available at western higher education facilities and what provisions exist for sharing…

  3. Design & layout of recreation facilities

    Treesearch

    Howard R. Orr

    1971-01-01

    Design and layout of recreation facilities is a problem solving process that must be divorced from the emotionalism that has shrouded outdoor recreation and must deal deliberately with the growing information concerning people and natural resources.

  4. 40 CFR 60.740 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... fraction; (3) Web coating operations that print an image on the surface of the substrate or any coating... coating operation and any onsite coating mix preparation equipment used to prepare coatings for the... coatings at one plant for shipment to another plant for use in an affected facility (coating operation) or...

  5. Production Facility SCADA Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale, Gregory E.; Holloway, Michael Andrew; Baily, Scott A.

    2015-03-23

    The following report covers FY 14 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production facility. The goal of this effort is to provide Northstar with a baseline system design.

  6. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  7. 78 FR 15755 - Proposed Revision to Design of Structures, Components, Equipment and Systems; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0041] Proposed Revision to Design of Structures, Components, Equipment and Systems; Correction AGENCY: Nuclear Regulatory Commission. ACTION: Standard review... for comments of the proposed revision in Chapter 3, ``Design of Structures, Components, Equipment, and...

  8. New radiation protection calibration facility at CERN.

    PubMed

    Brugger, Markus; Carbonez, Pierre; Pozzi, Fabio; Silari, Marco; Vincke, Helmut

    2014-10-01

    The CERN radiation protection group has designed a new state-of-the-art calibration laboratory to replace the present facility, which is >20 y old. The new laboratory, presently under construction, will be equipped with neutron and gamma sources, as well as an X-ray generator and a beta irradiator. The present work describes the project to design the facility, including the facility placement criteria, the 'point-zero' measurements and the shielding study performed via FLUKA Monte Carlo simulations. © The Author 2013. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  9. Preliminary design study for an atomospheric science facility

    NASA Technical Reports Server (NTRS)

    Hutchison, R.

    1972-01-01

    The activities and results of the Atmospheric Science Facility preliminary design study are reported. The objectives of the study were to define the scientific goals, to determine the range of experiment types, and to develop the preliminary instrument design requirements for a reusable, general purpose, optical research facility for investigating the earth's atmosphere from a space shuttle orbital vehicle.

  10. Status of Activities to Implement a Sustainable System of MC&A Equipment and Methodological Support at Rosatom Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.D. Sanders

    Under the U.S.-Russian Material Protection, Control and Accounting (MPC&A) Program, the Material Control and Accounting Measurements (MCAM) Project has supported a joint U.S.-Russian effort to coordinate improvements of the Russian MC&A measurement system. These efforts have resulted in the development of a MC&A Equipment and Methodological Support (MEMS) Strategic Plan (SP), developed by the Russian MEM Working Group. The MEMS SP covers implementation of MC&A measurement equipment, as well as the development, attestation and implementation of measurement methodologies and reference materials at the facility and industry levels. This paper provides an overview of the activities conducted under the MEMS SP,more » as well as a status on current efforts to develop reference materials, implement destructive and nondestructive assay measurement methodologies, and implement sample exchange, scrap and holdup measurement programs across Russian nuclear facilities.« less

  11. How to Design and Equip a Mentalization-Based Play Therapy Room.

    PubMed

    Rüth, Ulrich; Holch, Astrid

    2018-01-01

    Designing and equipping a play therapy room as a differentiated tool in a psychodynamic approach to child psychotherapy is seldom discussed. This article sketches out the equipment and furnishing of a play therapy room to be used for mentalization-based psychodynamic psychotherapy and gives examples of the use of such a room in practice.

  12. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... This is the mean and standard deviation, respectively, of the differences between the known sample... sample analysis, and the materials necessary to perform the tests; (2) Each facility test rig must be of... facilities. (a) Each request for designation as a facility authorized to perform approval tests must be...

  13. POWER-BURST FACILITY (PBF) CONCEPTUAL DESIGN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wasserman, A.A.; Johnson, S.O.; Heffner, R.E.

    1963-06-21

    A description is presented of the conceptual design of a high- performance, pulsed reactor called the Power Burst Facility (PBF). This reactor is designed to generate power bursts with initial asymptotic periods as short as 1 msec, producing energy releases large enough to destroy entire fuel subassemblies placed in a capsule or flow loop mounted in the reactor, all without damage to the reactor itself. It will be used primarily to evaluate the consequences and hazards of very rapid destructive accidents in reactors representing the entire range of current nuclear technology as applied to power generation, propulsion, and testing. Itmore » will also be used to carry out detailed studies of nondestructive reactivity feedback mechanisms in the shortperiod domain. The facility was designed to be sufficiently flexible to accommodate future cores of even more advanced design. The design for the first reactor core is based upon proven technology; hence, completion of the final design of this core will involve no significant development delays. Construction of the PBF is proposed to begin in September 1984, and is expected to take approximately 20 months to complete. (auth)« less

  14. Throughput Optimization of Continuous Biopharmaceutical Manufacturing Facilities.

    PubMed

    Garcia, Fernando A; Vandiver, Michael W

    2017-01-01

    In order to operate profitably under different product demand scenarios, biopharmaceutical companies must design their facilities with mass output flexibility in mind. Traditional biologics manufacturing technologies pose operational challenges in this regard due to their high costs and slow equipment turnaround times, restricting the types of products and mass quantities that can be processed. Modern plant design, however, has facilitated the development of lean and efficient bioprocessing facilities through footprint reduction and adoption of disposable and continuous manufacturing technologies. These development efforts have proven to be crucial in seeking to drastically reduce the high costs typically associated with the manufacturing of recombinant proteins. In this work, mathematical modeling is used to optimize annual production schedules for a single-product commercial facility operating with a continuous upstream and discrete batch downstream platform. Utilizing cell culture duration and volumetric productivity as process variables in the model, and annual plant throughput as the optimization objective, 3-D surface plots are created to understand the effect of process and facility design on expected mass output. The model shows that once a plant has been fully debottlenecked it is capable of processing well over a metric ton of product per year. Moreover, the analysis helped to uncover a major limiting constraint on plant performance, the stability of the neutralized viral inactivated pool, which may indicate that this should be a focus of attention during future process development efforts. LAY ABSTRACT: Biopharmaceutical process modeling can be used to design and optimize manufacturing facilities and help companies achieve a predetermined set of goals. One way to perform optimization is by making the most efficient use of process equipment in order to minimize the expenditure of capital, labor and plant resources. To that end, this paper introduces a

  15. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  16. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  17. 42 CFR 37.43 - Protection against radiation emitted by roentgenographic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specified in § 37.41, roentgenographic equipment, its use and the facilities (including mobile facilities... facilities (including mobile facilities) in which such equipment is used shall conform to the recommendations... roentgenographic equipment. 37.43 Section 37.43 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...

  18. Facility and Laboratory Equipment | Energy Systems Integration Facility |

    Science.gov Websites

    Energy Systems Integration Facility is its infrastructure. In addition to extensive fixed laboratory . Photo of researchers testing building loads and power networks in the Systems Performance Laboratory

  19. 78 FR 37760 - Electrical Equipment in Hazardous Locations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...

  20. Acoustical Design of Music Education Facilities.

    ERIC Educational Resources Information Center

    McCue, Edward, Ed.; Talaske, Richard H., Ed.

    This publication provides essays on the acoustical design of music education facilities and reproductions of posters describing 50 projects presented at the 117th Meeting of the Acoustical Society of American held in Syracuse, New York in May 1989. Essays are as follows: "Introduction to the Design Process" (Richard Talaske); "The…

  1. 9 CFR 71.7 - Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and disinfecting. 71.7 Section 71.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE...

  2. 9 CFR 71.7 - Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and disinfecting. 71.7 Section 71.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE...

  3. 9 CFR 71.7 - Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and disinfecting. 71.7 Section 71.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE...

  4. 9 CFR 71.7 - Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and disinfecting. 71.7 Section 71.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE...

  5. 9 CFR 71.7 - Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Means of conveyance, facilities, premises, and cages and other equipment; methods of cleaning and disinfecting. 71.7 Section 71.7 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE INTERSTATE...

  6. Design and initial application of the extended aircraft interrogation and display system: Multiprocessing ground support equipment for digital flight systems

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.

    1987-01-01

    A pipelined, multiprocessor, general-purpose ground support equipment for digital flight systems has been developed and placed in service at the NASA Ames Research Center's Dryden Flight Research Facility. The design is an outgrowth of the earlier aircraft interrogation and display system (AIDS) used in support of several research projects to provide engineering-units display of internal control system parameters during development and qualification testing activities. The new system, incorporating multiple 16-bit processors, is called extended AIDS (XAIDS) and is now supporting the X-29A forward-swept-wing aircraft project. This report describes the design and mechanization of XAIDS and shows the steps whereby a typical user may take advantage of its high throughput and flexible features.

  7. Stiffness Parameter Design of Suspension Element of Under-Chassis-Equipment for A Rail Vehicle

    NASA Astrophysics Data System (ADS)

    Ma, Menglin; Wang, Chengqiang; Deng, Hai

    2017-06-01

    According to the frequency configuration requirements of the vibration of railway under-chassis-equipment, the three- dimension stiffness of the suspension elements of under-chassis-equipment is designed based on the static principle and dynamics principle. The design results of the concrete engineering case show that, compared with the design method based on the static principle, the three- dimension stiffness of the suspension elements designed by the dynamic principle design method is more uniform. The frequency and decoupling degree analysis show that the calculation frequency of under-chassis-equipment under the two design methods is basically the same as the predetermined frequency. Compared with the design method based on the static principle, the design method based on the dynamic principle is adopted. The decoupling degree can be kept high, and the coupling vibration of the corresponding vibration mode can be reduced effectively, which can effectively reduce the fatigue damage of the key parts of the hanging element.

  8. Lessons learned: clinicians' post-occupancy perspective of facility design involvement.

    PubMed

    Reno, Kathy; Okland, Kathy; Finis, Nanne; Lamantia, Gina; Call, Roger; Cardon, Kerrie; Gerber, Deborah; Zeigler, Janet

    2014-01-01

    The research was conducted to determine clinician knowledge needs for competent involvement with the facility design process as well as to gather lessons learned on building stronger design teams. As clinical stakeholders are invited to the healthcare facility design table, the question arises as to the ability of professionally diverse team members to translate each other's comments and ideas accurately. In the past, hospitals were designed by a handful of hospital leaders and architects. More recently, multiple players have become involved throughout the design and construction of new healthcare facilities. Clinical consultants from two international healthcare companies observed that many clinicians were unprepared to effectively translate their needs to the architectural community or to competently utilize architectural tools and documents. A qualitative, post-occupancy cross-case study was conducted to understand how clinicians could increase their competencies for successful involvement in facility design. Focus group interviews were held with teams from healthcare facilities occupying their new facility for more than 6 months and less than 2 years. Curriculum topics were validated and additional areas recommended based on the interviews. Open-ended questioins on lessons learned provided several new dimensions to the research. Although validating the curriculum was the initial intent, the feedback from the focus groups on lessons learned provided rich concepts for practice implications and further research on post-occupancy. Decision-making, design process, interdisciplinary, planning, post-occupancy.

  9. Interior Design Factors in Library Facilities.

    ERIC Educational Resources Information Center

    Jackson, Patricia Ann

    When planning the interior of a library facility, the planning team of librarian, library consultant, architect, and interior design consultant must focus attention on the basic principles of interior design and the psychological needs of the user. Colors for an interior should be selected with careful regard to space, light, and emotional and…

  10. Aquatic Equipment Information.

    ERIC Educational Resources Information Center

    Sova, Ruth

    Equipment usually used in water exercise programs is designed for variety, intensity, and program necessity. This guide discusses aquatic equipment under the following headings: (1) equipment design; (2) equipment principles; (3) precautions and contraindications; (4) population contraindications; and (5) choosing equipment. Equipment is used…

  11. 9 CFR 592.95 - Facilities and equipment to be furnished for use of inspection program personnel in performing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Facilities and equipment to be furnished for use of inspection program personnel in performing service. 592.95 Section 592.95 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION...

  12. 30 CFR 585.815 - What must I do if I have facility damage or an equipment failure?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Conducted Under SAPs, COPs and GAPs Equipment Failure and Adverse Environmental Effects § 585.815 What must... failure under § 585.831, BOEM may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by § 585.634 (COP), § 585.617 (SAP), § 585.655 (GAP...

  13. 30 CFR 285.815 - What must I do if I have facility damage or an equipment failure?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Assessments for Activities Conducted Under SAPs, COPs and GAPs Equipment Failure and Adverse Environmental... damage or failure under § 285.831, MMS may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by § 285.634 (COP), § 285.617 (SAP), § 285...

  14. 30 CFR 585.815 - What must I do if I have facility damage or an equipment failure?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Conducted Under SAPs, COPs and GAPs Equipment Failure and Adverse Environmental Effects § 585.815 What must... failure under § 585.831, BOEM may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by § 585.634 (COP), § 585.617 (SAP), § 585.655 (GAP...

  15. 30 CFR 585.815 - What must I do if I have facility damage or an equipment failure?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Conducted Under SAPs, COPs and GAPs Equipment Failure and Adverse Environmental Effects § 585.815 What must... failure under § 585.831, BOEM may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by § 585.634 (COP), § 585.617 (SAP), § 585.655 (GAP...

  16. Energy-Efficient Design for Florida Educational Facilities.

    ERIC Educational Resources Information Center

    Florida Solar Energy Center, Cape Canaveral.

    This manual provides a detailed simulation analysis of a variety of energy conservation measures (ECMs) with the intent of giving educational facility design teams in Florida a basis for decision making. The manual's three sections cover energy efficiency design considerations that appear throughout the following design processes: schematic…

  17. Designing for Education: Compendium of Exemplary Educational Facilities 2011

    ERIC Educational Resources Information Center

    OECD Publishing (NJ3), 2011

    2011-01-01

    "Designing for Education: Compendium of Exemplary Educational Facilities 2011" showcases over 60 recently built or refurbished educational facilities from 28 countries. Collectively, these projects demonstrate state-of-the-art design in this field and each one is lavishly illustrated with colour photos, plans and descriptions. [A free PDF is…

  18. 49 CFR 605.12 - Use of project equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., facilities or equipment funded under the Acts. A grantee or operator may, however, use such buses, facilities... 49 Transportation 7 2010-10-01 2010-10-01 false Use of project equipment. 605.12 Section 605.12..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.12 Use of project equipment...

  19. Planning and Equipping a New Machine Shop

    ERIC Educational Resources Information Center

    Bloom, Nick

    1978-01-01

    The author describes the planning and equipping of a new machine shop facility at the East Los Angeles Occupational Center. Lists of machine shop and classroom equipment, a floor plan of the facility, and some new shop curriculum approaches are included. (MF)

  20. 46 CFR 153.486 - Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.486 Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D. (a) If NLS... 46 Shipping 5 2014-10-01 2014-10-01 false Design and equipment for removing NLS residue by...

  1. 46 CFR 153.486 - Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.486 Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D. (a) If NLS... 46 Shipping 5 2013-10-01 2013-10-01 false Design and equipment for removing NLS residue by...

  2. 46 CFR 153.486 - Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.486 Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D. (a) If NLS... 46 Shipping 5 2012-10-01 2012-10-01 false Design and equipment for removing NLS residue by...

  3. 46 CFR 153.486 - Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.486 Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D. (a) If NLS... 46 Shipping 5 2010-10-01 2010-10-01 false Design and equipment for removing NLS residue by...

  4. 46 CFR 153.486 - Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.486 Design and equipment for removing NLS residue by ventilation: Categories A, B, C, and D. (a) If NLS... 46 Shipping 5 2011-10-01 2011-10-01 false Design and equipment for removing NLS residue by...

  5. Suggestions for Designers of Navy Electronic Equipment. 1989 Edition. Revision B

    DTIC Science & Technology

    1989-07-01

    his design and the weak links in the reliability chain. From this information, he can make more reasonable decisions as to the need for design changes...SYSTEMS CENTER San Diego. Caifornl 92152-5000 ~89 12 12 084 It is a pleasure to make available this 1989 -Suggestions for Designers of Navy Electronic...the costs of supporting equipment for mission operations. The factors relate to early design decisions . Design deficiencies or design weaknesses in

  6. Implications of system usability on intermodal facility design.

    DOT National Transportation Integrated Search

    2010-08-01

    Ensuring good design of intermodal transportation facilities is critical for effective and : satisfactory operation. Passenger use of the facilities is often hindered by inadequate space, a poor : layout, or lack of signage. This project aims to impr...

  7. Equipment for Microgravity Research

    NASA Technical Reports Server (NTRS)

    Fountain, J. A.

    1986-01-01

    Illustrated catalog describes equipment and facilities available for experiments under low-gravity conditions. Catalog encourages scientific and commercial organizations to investigate benefits of conducting research and manufacturing activities in microgravity environment. Catalog covers equipment ranging from containers to spacecraft.

  8. Using Campus Facilities for Marketing.

    ERIC Educational Resources Information Center

    Carmichael, Bruce

    1992-01-01

    College buildings, interiors, furniture, spaces, landscaping, and equipment express what the college stands for, what it cares most about, and how it views the intellectual and aesthetic enterprise. Well-designed and well-built physical facilities, especially those that are distinctive, should be a more recognized force in any college's enrollment…

  9. School Facilities: America's Schools Not Designed or Equipped for 21st Century. Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Health, Education, and Human Services Div.

    This document presents findings of a General Accounting Office study that examined the extent to which America's schools have the physical capacity to support learning into the 21st century. Specifically, it looked at facilities requirements, environmental conditions, educational technologies, and facility infrastructure. Data were collected…

  10. Development of cloud-operating platform for detention facility design

    NASA Astrophysics Data System (ADS)

    Tun Lee, Kwan; Hung, Meng-Chiu; Tseng, Wei-Fan; Chan, Yi-Ping

    2017-04-01

    In the past 20 years, the population of Taiwan has accumulated in urban areas. The land development has changed the hydrological environment and resulted in the increase of surface runoff and shortened the time to peak discharge. The change of runoff characteristics increases the flood risk and reduces resilient ability of the city during flood. Considering that engineering measures may not be easy to implement in populated cities, detention facilities set on building basements have been proposed to compromise the increase of surface runoff resulting from development activities. In this study, a web-based operational platform has been developed to integrate the GIS technologies, hydrological analyses, as well as relevant regulations for the design of detention facilities. The design procedure embedded in the system includes a prior selection of type and size of the detention facility, integrated hydrological analysis for the developing site, and inspection of relevant regulations. After login the platform, designers can access the system database to retrieve road maps, land use coverages, and storm sewer information. Once the type, size, inlet, and outlet of the detention facility are assigned, the system can acquire the rainfall intensity-duration-frequency information from adjacent rain gauges to perform hydrological analyses for the developing site. The increase of the runoff volume due to the development and the reduction of the outflow peak through the construction of the detention facility can be estimated. The outflow peak at the target site is then checked with relevant regulations to confirm the suitability of the detention facility design. The proposed web-based platform can provide a concise layout of the detention facility and the drainageway of the developing site on a graphical interface. The design information can also be delivered directly through a web link to authorities for inspecting to simplify the complex administrative procedures.

  11. Overview of NORM and activities by a NORM licensed permanent decontamination and waste processing facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mirro, G.A.

    1997-02-01

    This paper presents an overview of issues related to handling NORM materials, and provides a description of a facility designed for the processing of NORM contaminated equipment. With regard to handling NORM materials the author discusses sources of NORM, problems, regulations and disposal options, potential hazards, safety equipment, and issues related to personnel protection. For the facility, the author discusses: description of the permanent facility; the operations of the facility; the license it has for handling specific radioactive material; operating and safety procedures; decontamination facilities on site; NORM waste processing capabilities; and offsite NORM services which are available.

  12. Proposed BISOL Facility - a Conceptual Design

    NASA Astrophysics Data System (ADS)

    Ye, Yanlin

    2018-05-01

    In China, a new large-scale nuclear-science research facility, namely the "Beijing Isotope-Separation-On-Line neutron-rich beam facility (BISOL)", has been proposed and reviewed by the governmental committees. This facility aims at both basic science and application goals, and is based on a double-driver concept. On the basic science side, the radioactive ion beams produced from the ISOL device, driven by a research reactor or by an intense deuteron-beam ac- celerator, will be used to study the new physics and technologies at the limit of the nuclear stability in the medium mass region. On the other side regarding to the applications, the facility will be devoted to the material research asso- ciated with the nuclear energy system, by using typically the intense neutron beams produced from the deuteron-accelerator driver. The initial design will be outlined in this report.

  13. Conceptual design of an in-space cryogenic fluid management facility, executive summary

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.

  14. Playground Facilities and Equipment. ACSA School Management Digest, Series 1, Number 7. ERIC/CEM Research Analysis Series, Number 34.

    ERIC Educational Resources Information Center

    Coursen, David

    Modern educators and playground designers are increasingly recognizing that play is a part, perhaps the decisive part, of the entire learning process. Theories of playground equipment design, planning the playground, financial considerations, and equipment suggestions are featured in this review. Examples of playgrounds include innovative…

  15. 9 CFR 592.95 - Facilities and equipment to be furnished for use of inspection program personnel in performing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Facilities and equipment to be furnished for use of inspection program personnel in performing service. 592.95 Section 592.95 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performanc...

  16. 9 CFR 592.95 - Facilities and equipment to be furnished for use of inspection program personnel in performing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Facilities and equipment to be furnished for use of inspection program personnel in performing service. 592.95 Section 592.95 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performanc...

  17. 9 CFR 592.95 - Facilities and equipment to be furnished for use of inspection program personnel in performing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Facilities and equipment to be furnished for use of inspection program personnel in performing service. 592.95 Section 592.95 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performanc...

  18. 9 CFR 592.95 - Facilities and equipment to be furnished for use of inspection program personnel in performing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Facilities and equipment to be furnished for use of inspection program personnel in performing service. 592.95 Section 592.95 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performanc...

  19. Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume II: Field and laboratory reports, Part 2 of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigo, H.G.; Chandler, A.J.

    Volume II (part 2 of 2) of ''Retrofit of Waste-to-energy Facilities Equipped with Electrostatic Precipitators'' contains the field and laboratory reports, including: (1) field reports, (2) analytic laboratory reports, (3) chain of custody forms, and (4) TCLP laboratory reports.

  20. Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume II: Field and Laboratory Reports, Part 1 of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigo, H.G.; Chandler, A.J.

    1996-04-01

    Volume II (part 1 of 2) of ''Retrofit of Waste-to-energy Facilities Equipped with Electrostatic Precipitators'' contains the documentation and raw data, including: (1) field reports, (2) analytic laboratory reports, (3) chain of custody forms, and (4) TCLP laboratory reports.

  1. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  2. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  3. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  4. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  5. 40 CFR 60.90 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Hot Mix Asphalt Facilities § 60.90 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility is comprised only of any combination of the following...

  6. Planning and Designing Facilities. Facility Design and Development--Part 1

    ERIC Educational Resources Information Center

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  7. Truck facility access design guidelines statewide.

    DOT National Transportation Integrated Search

    2011-06-01

    The overall purpose of this project is to develop design guidelines for truck access to truck stop facilities adjoining interstate highways and accessed by interchanges in Louisiana. The specific objectives of the research are to: 1. Identify existin...

  8. Conceptual design of equipment to excavate and transport regolith from the lunar maria

    NASA Technical Reports Server (NTRS)

    Detwiler, Mark; Foong, Chee Seng; Stocklin, Catherine

    1990-01-01

    NASA hopes to have a manned lunar outpost completed by 2005. In order to establish the base, regolith must be excavated from the lunar surface. Regolith will be used as a source for life-supporting elements and as radiation shielding for the lunar outpost. The design team from the University of Texas at Austin designed excavation and transportation equipment for initial operations of the lunar base. The design team also characterized the elements to be found in the regolith and determined the power required to excavate regolith. The characterization of the soil was based on a literature review of lunar geography. Power requirements for excavation were developed by adapting terrestrial equations for excavation power requirements and adapting them to lunar soil conditions. The design of the excavation and transportation equipment was broken into three functions: loosing, collecting, and transporting. A scarifier was selected to loosen, a bucket was selected to collect, and a load-haul system was selected to transport. The functions are powered by a modular fuel cell powered vehicle that provides power for motion of the equipment.

  9. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  10. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  11. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  12. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  13. 40 CFR 60.400 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Phosphate Rock Plants § 60.400 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities used in phosphate rock plants..., calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or...

  14. A Facilities Manager's Guide to Green Building Design.

    ERIC Educational Resources Information Center

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  15. Design and Evaluation of Wood Processing Facilities Using Object-Oriented Simulation

    Treesearch

    D. Earl Kline; Philip A. Araman

    1992-01-01

    Managers of hardwood processing facilities need timely information on which to base important decisions such as when to add costly equipment or how to improve profitability subject to time-varying demands. The overall purpose of this paper is to introduce a tool that can effectively provide such timely information. A simulation/animation modeling procedure is described...

  16. 40 CFR 60.300 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Applicability and designation of affected facility. 60.300 Section 60.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Grain Elevators § 60.300 Applicability and designation of affected facility. (a) The...

  17. 40 CFR 60.300 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Applicability and designation of affected facility. 60.300 Section 60.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Grain Elevators § 60.300 Applicability and designation of affected facility. (a) The...

  18. Balancing Multiple Needs through Innovative Facility Design.

    ERIC Educational Resources Information Center

    Romano, C. Renee; Hanish, Jan

    2003-01-01

    Designing buildings that incorporate and integrate a number of departments and functions is one way that colleges and universities are balancing financial challenges and facility needs. These buildings can transform the campus, but they require planning and coordination from a carefully assembled design team. (Contains 18 references.) (Author)

  19. Design Portfolio, 1995. The Educational Facility Planner.

    ERIC Educational Resources Information Center

    The Educational Facility Planner, 1995

    1995-01-01

    This document contains nationally recognized educational-facility designs, including the 1994 James D. MacConnell Award Winner--Heritage Oak Elementary School in Roseville, California. The architectural designs of other schools are also included--10 elementary schools, 6 high schools, 1 vocational school, 3 institutes of higher education, 1…

  20. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  1. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  2. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  3. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  4. 10 CFR 835.1002 - Facility design and modifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....1002 Energy DEPARTMENT OF ENERGY OCCUPATIONAL RADIATION PROTECTION Design and Control § 835.1002... occupational exposure is maintained ALARA in developing and justifying facility design and physical controls... in § 835.202. (c) Regarding the control of airborne radioactive material, the design objective shall...

  5. Design analysis of levitation facility for space processing applications. [Skylab program, space shuttles

    NASA Technical Reports Server (NTRS)

    Frost, R. T.; Kornrumpf, W. P.; Napaluch, L. J.; Harden, J. D., Jr.; Walden, J. P.; Stockhoff, E. H.; Wouch, G.; Walker, L. H.

    1974-01-01

    Containerless processing facilities for the space laboratory and space shuttle are defined. Materials process examples representative of the most severe requirements for the facility in terms of electrical power, radio frequency equipment, and the use of an auxiliary electron beam heater were used to discuss matters having the greatest effect upon the space shuttle pallet payload interfaces and envelopes. Improved weight, volume, and efficiency estimates for the RF generating equipment were derived. Results are particularly significant because of the reduced requirements for heat rejection from electrical equipment, one of the principal envelope problems for shuttle pallet payloads. It is shown that although experiments on containerless melting of high temperature refractory materials make it desirable to consider the highest peak powers which can be made available on the pallet, total energy requirements are kept relatively low by the very fast processing times typical of containerless experiments and allows consideration of heat rejection capabilities lower than peak power demand if energy storage in system heat capacitances is considered. Batteries are considered to avoid a requirement for fuel cells capable of furnishing this brief peak power demand.

  6. Institutional management of core facilities during challenging financial times.

    PubMed

    Haley, Rand

    2011-12-01

    The economic downturn is likely to have lasting effects on institutions of higher education, prioritizing proactive institutional leadership and planning. Although by design, core research facilities are more efficient and effective than supporting individual pieces of research equipment, cores can have significant underlying financial requirements and challenges. This paper explores several possible institutional approaches to managing core facilities during challenging financial times.

  7. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  8. Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment

    NASA Astrophysics Data System (ADS)

    Cox, E. A.

    1982-02-01

    HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.

  9. 77 FR 18151 - Discharge Removal Equipment for Vessels Carrying Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions... ``Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative... CGD 90-068] RIN 1625-AA02, Formerly 2115-AD66 Discharge Removal Equipment for Vessels Carrying Oil...

  10. Influence of gamma-ray skyshine on nuclear facilities design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ohta, M.; Tsuji, M.; Kimura, Y.

    1986-01-01

    In safety analysis of nuclear facilities, skyshine dose rate at site boundary is one of the most important shielding design problems. For nuclear power stations in Japan, the skyshine dose rate at the site boundary has been specified not to exceed 5 mR/yr by the authorities, including total dose contribution from all structures on site, and this guide is commonly applied to other nuclear fuel cycle facilities. Therefore the design criterion dose of each structure on site is, considering plot planning, shielding condition, and so on, defined as a value <5 mR/yr. The purpose of this study is to investigatemore » how skyshine dose standards or other factors have an influence on the design of nuclear facilities, in a parametric survey of gamma-ray skyshine.« less

  11. Injury survey of a non-traditional 'soft-edged' trampoline designed to lower equipment hazards.

    PubMed

    Eager, David B; Scarrott, Carl; Nixon, Jim; Alexander, Keith

    2013-01-01

    In Australia trampolines contribute one quarter of all childhood play equipment injuries. The objective of this study was to gather and evaluate injury data from a non-traditional, 'soft-edged', consumer trampoline, where the design aimed to minimise injuries from the equipment and from falling off. The manufacturer of the non-traditional trampoline provided the University of Technology Sydney with their Australian customer database. The study involved surveys in Queensland and New South Wales, between May 2007 and March 2010. Initially injury data was gathered by a phone interview pilot study, then in the full study, through an email survey. The 3817 respondents were the carers of child users of the 'soft-edge' trampolines. Responses were compared with Australian and US emergency department data. In both countries the proportion of injuries caused by the equipment and falling off was compared with the proportion caused by the jumpers to themselves or each other. The comparisons showed a significantly lower proportion resulted from falling-off or hitting the equipment for this design when compared to traditional trampolines, both in Australia and the US. This research concludes that equipment-induced and falling-off injuries, the more severe injuries on traditional trampolines, can be significantly reduced with appropriate trampoline design.

  12. 40 CFR 60.260 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affected facility. 60.260 Section 60.260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Ferroalloy Production Facilities § 60.260 Applicability and designation of affected facility..., ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese...

  13. 40 CFR 60.260 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affected facility. 60.260 Section 60.260 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Ferroalloy Production Facilities § 60.260 Applicability and designation of affected facility..., ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese...

  14. Cold Vacuum Drying facility civil structural system design description (SYS 06)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PITKOFF, C.C.

    This document describes the Cold Vacuum Drying (CVD) Facility civil - structural system. This system consists of the facility structure, including the administrative and process areas. The system's primary purpose is to provide for a facility to house the CVD process and personnel and to provide a tertiary level of containment. The document provides a description of the facility and demonstrates how the design meets the various requirements imposed by the safety analysis report and the design requirements document.

  15. Survey of injury sources for a trampoline with equipment hazards designed out

    PubMed Central

    Eager, David; Scarrott, Carl; Nixon, Jim; Alexander, Keith

    2012-01-01

    Aim In Australia, trampolines contribute approximately one-quarter of all childhood play-equipment injuries. The purpose of this study was to gather and evaluate injury data from a nontraditional, ‘soft-edged’, consumer trampoline in which the equipment injury sources have been designed out. Methods A survey was undertaken in Queensland and New South Wales. The manufacturer of the nontraditional trampoline provided the University of Technology, Sydney, with their Australian customer database. Injury data were gathered in a pilot study by phone interview, then in a full study through an email survey. Results from 3817 respondents were compared with earlier Australian and US data from traditional trampolines gathered from emergency departments. Results A significantly lower proportion of the injuries caused by falling off or striking the equipment was found for this new design when compared with traditional trampolines both in Australia and in the USA. The age of children being injured on trampolines in Australia was found to be markedly lower than in North America. Conclusions This research indicates that with appropriate design the more severe injuries on traditional trampolines can be significantly reduced. PMID:22404557

  16. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  17. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  18. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  19. Energy Conscious Design: Educational Facilities. [Brief No.] 1.

    ERIC Educational Resources Information Center

    American Inst. of Architects, Washington, DC.

    An energy task group of the American Institute of Architects discusses design features and options that educational facility designers can use to create an energy efficient school building. Design elements cover the building envelope, energy storage system, hydronic heating/cooling systems, solar energy collection, building orientation and shape,…

  20. Design and Manufacturing of Composite Tower Structure for Wind Turbine Equipment

    NASA Astrophysics Data System (ADS)

    Park, Hyunbum

    2018-02-01

    This study proposes the composite tower design process for large wind turbine equipment. In this work, structural design of tower and analysis using finite element method was performed. After structural design, prototype blade manufacturing and test was performed. The used material is a glass fiber and epoxy resin composite. And also, sand was used in the middle part. The optimized structural design and analysis was performed. The parameter for optimized structural design is weight reduction and safety of structure. Finally, structure of tower will be confirmed by structural test.

  1. Indian LSSC (Large Space Simulation Chamber) facility

    NASA Technical Reports Server (NTRS)

    Brar, A. S.; Prasadarao, V. S.; Gambhir, R. D.; Chandramouli, M.

    1988-01-01

    The Indian Space Agency has undertaken a major project to acquire in-house capability for thermal and vacuum testing of large satellites. This Large Space Simulation Chamber (LSSC) facility will be located in Bangalore and is to be operational in 1989. The facility is capable of providing 4 meter diameter solar simulation with provision to expand to 4.5 meter diameter at a later date. With such provisions as controlled variations of shroud temperatures and availability of infrared equipment as alternative sources of thermal radiation, this facility will be amongst the finest anywhere. The major design concept and major aspects of the LSSC facility are presented here.

  2. How to Tackle Tough Facility Design Considerations

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    This article is part of a series that has offered insight on planning a facilities project, hiring professionals, delivery system options and owner's responsibilities. In this article, the author focuses on some of the planning and design concepts one may be asked to consider in providing direction to his design and construction team. These…

  3. Health facilities humanisation: design guidelines supported by statistical evidence.

    PubMed

    Bosia, Daniela; Marino, Donatella; Peretti, Gabriella

    2016-01-01

    Healthcare building humanisation is currently a widely debated issue and the development of patient centered and evidence based design is growing worldwide. Many international health organizations and researchers understand the importance of Patient Centred Design and leading architects incorporate it into the design process. In Italy this design approach is still at an early stage. The article refers to research commissioned by the Italian Health Ministry and carried out by R. Del Nord (Università degli Studi di Firenze) and G. Peretti (Politecnico di Torino) with their collaborators. The scope of the research was the definition of design guidelines for healthcare facilities humanisation. The methodology framework adopted is the well established need and performance approach in architectural design. The article deals with the results of statistical investigations for the definition and ranking of users' needs and the consistent expression of their requirements. The investigations were carried out with the cooperation of psychologists of the Università degli Studi di Torino and researchers of the Università degli Studi di Cagliari. The proposed evaluation system allows ranking of health facilities according to the level of humanisation achieved. The statistical investigation evidence collected allowed the definition of humanisation design guidelines for health-care facilities and for the assessment of their specific level of humanisation.

  4. Design of free-space optical transmission system in computer tomography equipment

    NASA Astrophysics Data System (ADS)

    Liu, Min; Fu, Weiwei; Zhang, Tao

    2018-04-01

    Traditional computer tomography (CT) based on capacitive coupling cannot satisfy the high data rate transmission requirement. We design and experimentally demonstrate a free-space optical transmission system for CT equipment at a data rate of 10 Gb / s. Two interchangeable sections of 12 pieces of fiber with equal length is fabricated and tested by our designed laser phase distance measurement system. By locating the 12 collimators in the edge of the circle wheel evenly, the optical propagation characteristics for the 12 wired and wireless paths are similar, which can satisfy the requirement of high-speed CT transmission system. After bit error rate (BER) measurement in several conditions, the BER performances are below the value of 10 - 11, which has the potential in the future application scenario of CT equipment.

  5. Isolation Facilities for Highly Infectious Diseases in Europe – A Cross-Sectional Analysis in 16 Countries

    PubMed Central

    Schilling, Stefan; Fusco, Francesco Maria; De Iaco, Giuseppina; Bannister, Barbara; Maltezou, Helena C.; Carson, Gail; Gottschalk, Rene; Brodt, Hans-Reinhard; Brouqui, Philippe; Puro, Vincenzo; Ippolito, Giuseppe

    2014-01-01

    Background Highly Infectious Diseases (HIDs) are (i) easily transmissible form person to person; (ii) cause a life-threatening illness with no or few treatment options; and (iii) pose a threat for both personnel and the public. Hence, even suspected HID cases should be managed in specialised facilities minimizing infection risks but allowing state-of-the-art critical care. Consensus statements on the operational management of isolation facilities have been published recently. The study presented was set up to compare the operational management, resources, and technical equipment among European isolation facilities. Due to differences in geography, population density, and national response plans it was hypothesized that adherence to recommendations will vary. Methods and Findings Until mid of 2010 the European Network for Highly Infectious Diseases conducted a cross-sectional analysis of isolation facilities in Europe, recruiting 48 isolation facilities in 16 countries. Three checklists were disseminated, assessing 44 items and 148 specific questions. The median feedback rate for specific questions was 97.9% (n = 47/48) (range: n = 7/48 (14.6%) to n = 48/48 (100%). Although all facilities enrolled were nominated specialised facilities' serving countries or regions, their design, equipment and personnel management varied. Eighteen facilities fulfilled the definition of a High Level Isolation Unit'. In contrast, 24 facilities could not operate independently from their co-located hospital, and five could not ensure access to equipment essential for infection control. Data presented are not representative for the EU in general, as only 16/27 (59.3%) of all Member States agreed to participate. Another limitation of this study is the time elapsed between data collection and publication; e.g. in Germany one additional facility opened in the meantime. Conclusion There are disparities both within and between European countries regarding the design and equipment

  6. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  7. Indoor Lighting Facilities

    NASA Astrophysics Data System (ADS)

    Matsushima, Koji; Saito, Yoshinori; Ichikawa, Shigenori; Kawauchi, Takao; Tanaka, Tsuneo; Hirano, Rika; Tazuke, Fuyuki

    According to the statistics by the Ministry of Land, Infrastructure and Transport, the total floor space of all building construction started was 188.87 million m2 (1.5% increase y/y), marking the fourth straight year of increase. Many large-scale buildings under construction in central Tokyo become fully occupied by tenants before completion. As for office buildings, it is required to develop comfortable and functional office spaces as working styles are becoming more and more diversified, and lighting is also an element of such functionalities. The total floor space of construction started for exhibition pavilions, multipurpose halls, conference halls and religious architectures decreased 11.1% against the previous year. This marked a decline for 10 consecutive years and the downward trend continues. In exhibition pavilions, the light radiation is measured and adjusted throughout the year so as not to damage the artworks by lighting. Hospitals, while providing higher quality medical services and enhancing the dwelling environment of patients, are expected to meet various restrictions and requirements, including the respect for privacy. Meanwhile, lighting designs for school classrooms tend to be homogeneous, yet new ideas are being promoted to strike a balance between the economical and functional aspects. The severe economic environment continues to be hampering the growth of theaters and halls in both the private and public sectors. Contrary to the downsizing trend of such facilities, additional installations of lighting equipment were conspicuous, and the adoption of high efficacy lighting appliances and intelligent function control circuits are becoming popular. In the category of stores/commercial facilities, the construction of complex facilities is a continuing trend. Indirect lighting, high luminance discharge lamps with excellent color rendition and LEDs are being effectively used in these facilities, together with the introduction of lighting designs

  8. Design of a signal conditioner for the Fermilab Magnet Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giannelli, Pietro

    2012-01-01

    This thesis describes the design of a remotely-programmable signal conditioner for the harmonic measurement of accelerator magnets. A 10-channel signal conditioning circuit featuring bucking capabilities was designed from scratch and implemented to the level of the printed circuit board layout. Other system components were chosen from those available on the market. Software design was started with the definition of routine procedures. This thesis is part of an upgrade project for replacing obsolescent automated test equipment belonging to the Fermilab Magnet Test Facility. The design started with a given set of requirements. Using a top-down approach, all the circuits were designedmore » and their expected performances were theoretically predicted and simulated. A limited prototyping phase followed. The printed circuit boards were laid out and routed using a CAD software and focusing the design on maximum electromagnetic interference immunity. An embedded board was selected for controlling and interfacing the signal conditioning circuitry with the instrumentation network. Basic low level routines for hardware access were defined. This work covered the entire design process of the signal conditioner, resulting in a project ready for manufacturing. The expected performances are in line with the requirements and, in the cases where this was not possible, approval of trade-offs was sought and received from the end users. Part I deals with the global structure of the signal conditioner and the subdivision in functional macro-blocks. Part II treats the hardware design phase in detail, covering the analog and digital circuits, the printed circuit layouts, the embedded controller and the power supply selection. Part III deals with the basic hardware-related routines to be implemented in the final software.« less

  9. Design of Alarm Sound of Home Care Equipment Based on Age-related Auditory Sense

    NASA Astrophysics Data System (ADS)

    Shibano, Jun-Ichi; Tadano, Shigeru; Kaneko, Hirotaka

    A wide variety of home care equipment has been developed to support the independent lifestyle and care taking of elderly persons. Almost all of the equipment has an alarm designed to alert a care person or to sound a warning in case of an emergency. Due to the fact that aging human beings' senses physiologically, weaken and deteriorate, each alarm's sound must be designed to account for the full range of elderly person's hearing loss. Since the alarms are usually heard indoors, it is also necessary to evaluate the relationship between the basic characteristics of the sounds and living area's layout. In this study, we investigated the sounds of various alarms of the home care equipment based on both the age-related hearing characteristics of elderly persons and the propagation property of the sounds indoors. As a result, it was determined that the hearing characteristics of elderly persons are attuned to sounds which have a frequency from 700Hz to 1kHz, and it was learned that the indoor absorption ratio of sound is smallest when the frequency is 1kHz. Therefore, a frequency of 1kHz is good for the alarm sound of home care equipment. A flow chart to design the alarm sound of home care equipment was proposed, taking into account the extent of age-related auditory sense deterioration.

  10. A case study of collaborative facilities use in engineering design

    NASA Astrophysics Data System (ADS)

    Monroe, Laura; Pugmire, David

    2010-01-01

    In this paper we describe the use of visualization tools and facilities in the collaborative design of a replacement weapons system, the Reliable Replacement Warhead (RRW). We used not only standard collaboration methods but also a range of visualization software and facilities to bring together domain specialists from laboratories across the country to collaborate on the design and integrate this disparate input early in the design. This was the first time in U.S. weapons history that a weapon had been designed in this collaborative manner. Benefits included projected cost savings, design improvements and increased understanding across the project.

  11. Wall finish selection in hospital design: a survey of facility managers.

    PubMed

    Lavy, Sarel; Dixit, Manish K

    2012-01-01

    This paper seeks to analyze healthcare facility managers' perceptions regarding the materials used for interior wall finishes and the criteria used to select them. It also examines differences in wall finish materials and the selection process in three major hospital spaces: emergency, surgery, and in-patient units. These findings are compared with healthcare designers' perceptions on similar issues, as currently documented in the literature. Hospital design and the materials used for hospital construction have a considerable effect on the environment and health of patients. A 2002 survey revealed which characteristics healthcare facility designers consider when selecting materials for healthcare facilities; however, no similar study has examined the views of facility managers on building finish selection. A 22-question survey questionnaire was distributed to 210 facility managers of metropolitan, for-profit hospitals in Texas; IRB approval was obtained. Respondents were asked to rank 10 interior wall finish materials and 11 selection criteria for wall finishes. Data from 48 complete questionnaires were analyzed using descriptive statistics and nonparametric statistical analysis methods. The study found no statistically significant differences in terms of wall finish materials or the characteristics for material selection in the three major spaces studied. It identified facility managers' four most-preferred wall finish materials and the five-most preferred characteristics, with a statistical confidence level of greater than 95%. The paper underscores the importance of incorporating all perspectives: facility designers and facility managers should work together toward achieving common organizational goals.

  12. 48 CFR 215.404-71-4 - Facilities capital employed.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and equipment, as derived in DD Form 1861, Contract Facilities Capital Cost of Money. (i) In addition... facilities capital, the allocated facilities capital attributable to the buildings and equipment of those... Equipment 17.5 10 to 25 (g) Evaluation criteria. (1) In evaluating facilities capital employed, the...

  13. Designing efficient logging systems for northern hardwoods using equipment production capabilities and costs.

    Treesearch

    R.B. Gardner

    1966-01-01

    Describes a typical logging system used in the Lake and Northeastern States, discusses each step in the operation, and presents a simple method for designing and efficient logging system for such an operation. Points out that a system should always be built around the key piece of equipment, which is usually the skidder. Specific equipment types and their production...

  14. Evaluation of design ventilation requirements for enclosed parking facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayari, A.; Krarti, M.

    2000-07-01

    This paper proposes a new design approach to determine the ventilation requirements for enclosed parking garages. The design approach accounts for various factors that affect the indoor air quality within a parking facility, including the average CO emission rate, the average travel time, the number of cars, and the acceptable CO level within the parking garage. This paper first describes the results of a parametric analysis based on the design method that was developed. Then the design method is presented to explain how the ventilation flow rate can be determined for any enclosed parking facility. Finally, some suggestions are proposedmore » to save fan energy for ventilating parking garages using demand ventilation control strategies.« less

  15. 40 CFR 60.270 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... affected facility. 60.270 Section 60.270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... August 17, 1983 § 60.270 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in steel plants that produce carbon, alloy, or...

  16. 40 CFR 60.270 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... affected facility. 60.270 Section 60.270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... August 17, 1983 § 60.270 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in steel plants that produce carbon, alloy, or...

  17. E-4 Test Facility Design Status

    NASA Technical Reports Server (NTRS)

    Ryan, Harry; Canady, Randy; Sewell, Dale; Rahman, Shamim; Gilbrech, Rick

    2001-01-01

    Combined-cycle propulsion technology is a strong candidate for meeting NASA space transportation goals. Extensive ground testing of integrated air-breathing/rocket system (e.g., components, subsystems and engine systems) across all propulsion operational modes (e.g., ramjet, scramjet) will be needed to demonstrate this propulsion technology. Ground testing will occur at various test centers based on each center's expertise. Testing at the NASA John C. Stennis Space Center will be primarily concentrated on combined-cycle power pack and engine systems at sea level conditions at a dedicated test facility, E-4. This paper highlights the status of the SSC E-4 test Facility design.

  18. Infection prevention and control in the design of healthcare facilities.

    PubMed

    Farrow, Tye S; Black, Stephen M

    2009-01-01

    The lead paper, "Healthcare-Associated Infections as Patient Safety Indicators," written by Gardam, Lemieux, Reason, van Dijk and Goel, puts forward the design of healthcare facilities as one of many strategies to improve patient safety with respect to healthcare-associated infections. This commentary explores some of the issues in balancing infection prevention and control priorities with other needs and values brought to the design process. This balance is challenged not only by a lack of supporting evidence but also by the superficial nature in which infection prevention and control are often discussed within a design context. For the physical environment to support any patient safety initiative, the design of the processes must be developed in conjunction with that of the physical environment so that compliance can be natural and convenient. Finally, consideration is given to the value of documenting decision-making related to infection prevention and control in facility design and ongoing assessments of existing facilities.

  19. 47 CFR 74.750 - Transmission system facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator, and TV Booster Stations § 74.750 Transmission system facilities. (a) A low power TV, TV translator, or TV booster station shall operate with a transmitter that is either certificated for licensing... and TV translator transmitters will be certificated by the FCC: (1) The equipment shall be so designed...

  20. Survey of injury sources for a trampoline with equipment hazards designed out.

    PubMed

    Eager, David; Scarrott, Carl; Nixon, Jim; Alexander, Keith

    2012-07-01

    In Australia, trampolines contribute approximately one-quarter of all childhood play-equipment injuries. The purpose of this study was to gather and evaluate injury data from a nontraditional, 'soft-edged', consumer trampoline in which the equipment injury sources have been designed out. A survey was undertaken in Queensland and New South Wales. The manufacturer of the nontraditional trampoline provided the University of Technology, Sydney, with their Australian customer database. Injury data were gathered in a pilot study by phone interview, then in a full study through an email survey. Results from 3817 respondents were compared with earlier Australian and US data from traditional trampolines gathered from emergency departments.   A significantly lower proportion of the injuries caused by falling off or striking the equipment was found for this new design when compared with traditional trampolines both in Australia and in the USA. The age of children being injured on trampolines in Australia was found to be markedly lower than in North America. This research indicates that with appropriate design the more severe injuries on traditional trampolines can be significantly reduced. © 2012 The Authors. Journal of Paediatrics and Child Health © 2012 Paediatrics and Child Health Division (Royal Australasian College of Physicians).

  1. Fire safety design of a mobile quarantine facility

    NASA Technical Reports Server (NTRS)

    Bass, R. S.; Hirasaki, J. K.

    1971-01-01

    During the design phase of the Mobile Quarantine Facility (MQF), a primary consideration was fire safety. Therefore, appropriate criteria and ground rules were used in the design and construction of the facility. The fire codes and fire-requirement listings that are used by commerical airlines were supplied to the Manned Spacecraft Center (MSC) by the Federal Aviation Agency (FAA). After these codes were reviewed, a basic ground rule was adopted that flame protection for all combustible materials should be at least equivalent to or better than the standards for commercial aircraft. Because the MQF was designed to operate with an interior atmosphere of air rather than with an oxygen-enriched atmosphere such as that of the Apollo spacecraft cabin, the requirements for MQF material were not as stringent as those for the spacecraft.

  2. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  3. 40 CFR 61.90 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Emissions of Radionuclides Other Than Radon From Department of Energy Facilities § 61.90 Designation of... Department of Energy that emits any radionuclide other than radon-222 and radon-220 into the air, except that...

  4. 40 CFR 61.90 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Emissions of Radionuclides Other Than Radon From Department of Energy Facilities § 61.90 Designation of... Department of Energy that emits any radionuclide other than radon-222 and radon-220 into the air, except that...

  5. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  6. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  7. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  8. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  9. 40 CFR 60.60 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Portland Cement Plants § 60.60 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants...

  10. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Additional safety equipment... Pipeline Components § 192.171 Compressor stations: Additional safety equipment. (a) Each compressor station must have adequate fire protection facilities. If fire pumps are a part of these facilities, their...

  11. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  12. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  13. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  14. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  15. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  16. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  17. 40 CFR 60.170 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Primary Zinc Smelters § 60.170 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in primary zinc smelters...

  18. 40 CFR 60.330 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Stationary Gas Turbines § 60.330 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines...

  19. Design Criteria for Microbiological Facilities at Fort Detrick. Volume II: Design Criteria

    ERIC Educational Resources Information Center

    Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div.

    Volume II of a two-volume manual of design criteria, based primarily on biological safety considerations. It is prepared for the use of architect-engineers in designing new or modified microbiological facilities for Fort Detrick, Maryland. Volume II is divided into the following sections: (1) architectural, (2) heating, ventilating, and air…

  20. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  1. 40 CFR 264.32 - Required equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Preparedness and Prevention § 264.32 Required equipment. All facilities must be equipped with the following... referred to above must do so with part B of the permit application.] [45 FR 33221, May 19, 1980, as amended...

  2. Design strategies for the International Space University's variable gravity research facility

    NASA Technical Reports Server (NTRS)

    Bailey, Sheila G.; Chiaramonte, Francis P.; Davidian, Kenneth J.

    1990-01-01

    A variable gravity research facility named 'Newton' was designed by 58 students from 13 countries at the International Space University's 1989 summer session at the Universite Louis Pasteur, Strasbourge, France. The project was comprehensive in scope, including a political and legal foundation for international cooperation, development and financing; technical, science and engineering issues; architectural design; plausible schedules; and operations, crew issues and maintenance. Since log-term exposure to zero gravity is known to be harmful to the human body, the main goal was to design a unique variable gravity research facility which would find a practical solution to this problem, permitting a manned mission to Mars. The facility would not duplicate other space-based facilities and would provide the flexibility for examining a number of gravity levels, including lunar and Martian gravities. Major design alternatives included a truss versus a tether based system which also involved the question of docking while spinning or despinning to dock. These design issues are described. The relative advantages or disadvantages are discussed, including comments on the necessary research and technology development required for each.

  3. 40 CFR 60.710 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Magnetic Tape Coating Facilities § 60.710 Applicability and designation of affected facility... than 370 m3 of solvent for the manufacture of magnetic tape per calendar year is subject only to the... of magnetic tape equals or exceeds these amounts in any calendar year, the facility is subject to...

  4. 40 CFR 60.710 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Magnetic Tape Coating Facilities § 60.710 Applicability and designation of affected facility... than 370 m3 of solvent for the manufacture of magnetic tape per calendar year is subject only to the... of magnetic tape equals or exceeds these amounts in any calendar year, the facility is subject to...

  5. Feasibility study and verified design concept for new improved hot gas facility

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The MSFC Hot Gas Facility (HGF) was fabricated in 1975 as a temporary facility to provide immediate turnaround testing to support the SRB and ET TPS development. This facility proved to be very useful and was used to make more than 1300 runs, far more than ever intended in the original design. Therefore, it was in need of constant repair and needed to be replaced with a new improved design to support the continuing SRB/ET TPS product improvement and/or removal efforts. MSFC contracted with Lockheed-Huntsville to work on this improved design through contract NAS8-36304 Feasibility Study and Verified Design Concept for the New Improved Hot Gas Facility. The results of Lockheed-Huntsville's efforts under this contract are summarized.

  6. 46 CFR 108.653 - Helicopter facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  7. 46 CFR 108.653 - Helicopter facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  8. 46 CFR 108.653 - Helicopter facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  9. 46 CFR 108.653 - Helicopter facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  10. 46 CFR 108.653 - Helicopter facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  11. Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, K.; Melendez, M.; Gonzales, J.

    To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. This handbook covers the primary elements that must be considered when developing a CNG vehicle maintenance facility design that will protectmore » against the ignition of natural gas releases. It also discusses specific protocols and training needed to ensure safety.« less

  12. Conceptual design of the National Ignition Facility

    NASA Astrophysics Data System (ADS)

    Paisner, Jeffrey A.; Boyes, John D.; Kumpan, Steven A.; Lowdermilk, W. Howard; Sorem, Michael S.

    1995-12-01

    The Secretary of the U.S. Department of Energy (DOE) commissioned a conceptual design report (CDR) for the National Ignition Facility (NIF) in January 1993 as part of a key decision zero (KD0), justification of mission need. Motivated by the progress to date by the inertial confinement fusion (ICF) program in meeting the Nova technical contract goals established by the National Academy of Sciences in 1989, the Secretary requested a design using a solid-state laser driver operating at the third harmonic (0.35 micrometer) of neodymium (Nd) glass. The participating ICF laboratories signed a memorandum of agreement in August 1993, and established a project organization, including a technical team from the Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Laboratory for Laser Energetics at the University of Rochester. Since then, we completed the NIF conceptual design, based on standard construction at a generic DOE defense program's site, and issued a 7,000-page, 27-volume CDR in May 1994. Over the course of the conceptual design study, several other key documents were generated, including a facilities requirements document, a conceptual design scope and plan, a target physics design document, a laser design cost basis document, a functional requirements document, an experimental plan for indirect drive ignition, and a preliminary hazards analysis (PHA) document. DOE used the PHA to categorize the NIF as a low-hazard, non-nuclear facility. On October 21, 1994 the Secretary of Energy issued a key decision one (KD1) for the NIF, which approved the project and authorized DOE to request Office of Management and Budget-approval for congressional line-item FY 1996 NIF funding for preliminary engineering design and for National Environmental Policy Act activities. In addition, the Secretary declared Livermore as the preferred site for constructing the NIF. In February 1995, the NIF Project was

  13. Design and Construction of a Hydroturbine Test Facility

    NASA Astrophysics Data System (ADS)

    Ayli, Ece; Kavurmaci, Berat; Cetinturk, Huseyin; Kaplan, Alper; Celebioglu, Kutay; Aradag, Selin; Tascioglu, Yigit; ETU Hydro Research Center Team

    2014-11-01

    Hydropower is one of the clean, renewable, flexible and efficient energy resources. Most of the developing countries invest on this cost-effective energy source. Hydroturbines for hydroelectric power plants are tailor-made. Each turbine is designed and constructed according to the properties, namely the head and flow rate values of the specific water source. Therefore, a center (ETU Hydro-Center for Hydro Energy Research) for the design, manufacturing and performance tests of hydraulic turbines is established at TOBB University of Economics and Technology to promote research in this area. CFD aided hydraulic and structural design, geometry optimization, manufacturing and performance tests of hydraulic turbines are the areas of expertise of this center. In this paper, technical details of the design and construction of this one of a kind test facility in Turkey, is explained. All the necessary standards of IEC (International Electrotechnical Commission) are met since the test facility will act as a certificated test center for hydraulic turbines.

  14. Design of "Eye Closure" system for the stealth of photo-electric equipments

    NASA Astrophysics Data System (ADS)

    Zhang, Y.; Hua, W. S.; Li, G.

    2012-10-01

    Based on the optical activity of liquid crystal, a new approach for the stealth of "cat's eye" targets is proposed in this paper. It imitates the physiological close reaction of human eyes when strong light irradiates eyes. With this approach, the "cat's eye" effect will vanish, which is applied in restricting photo-electric equipments being detected and located by active laser detection system. The structure and working principle of the design are presented. The drive circuit is given to control the optical switch automatically. Feasibility of this design is demonstrated by experimental method. The measured data illustrate that the proposed approach is effective to eliminate the "cat's eye" effect, so as to enhancing the viability of photo-electric equipments on the battlefield.

  15. Engineering test facility design definition

    NASA Technical Reports Server (NTRS)

    Bercaw, R. W.; Seikel, G. R.

    1980-01-01

    The Engineering Test Facility (ETF) is the major focus of the Department of Energy (DOE) Magnetohydrodynamics (MHD) Program to facilitate commercialization and to demonstrate the commercial operability of MHD/steam electric power. The ETF will be a fully integrated commercial prototype MHD power plant with a nominal output of 200 MW sub e. Performance of this plant is expected to meet or surpass existing utility standards for fuel, maintenance, and operating costs; plant availability; load following; safety; and durability. It is expected to meet all applicable environmental regulations. The current design concept conforming to the general definition, the basis for its selection, and the process which will be followed in further defining and updating the conceptual design.

  16. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  17. An ARM Mobile Facility Designed for Marine Deployments

    NASA Astrophysics Data System (ADS)

    Wiscombe, W. J.

    2007-05-01

    The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.

  18. Brief, Why the Launch Equipment Test Facility Needs a Laser Tracker

    NASA Technical Reports Server (NTRS)

    Yue, Shiu H.

    2011-01-01

    The NASA Kennedy Space Center Launch Equipment Test Facility (LETF) supports a wide spectrum of testing and development activities. This capability was originally established in the 1970's to allow full-scale qualification of Space Shuttle umbilicals and T-O release mechanisms. The LETF has leveraged these unique test capabilities to evolve into a versatile test and development area that supports the entire spectrum of operational programs at KSC. These capabilities are historically Aerospace related, but can certainly can be adapted for other industries. One of the more unique test fixtures is the Vehicle Motion Simulator or the VMS. The VMS simulates all of the motions that a launch vehicle will experience from the time of its roll-out to the launch pad, through roughly the first X second of launch. The VMS enables the development and qualification testing of umbilical systems in both pre-launch and launch environments. The VMS can be used to verify operations procedures, clearances, disconnect systems performance &margins, and vehicle loads through processing flow motion excursions.

  19. The ISOLDE facility

    NASA Astrophysics Data System (ADS)

    Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.

    2017-09-01

    The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).

  20. Earth integrated design: office dormitory facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H. B.; Barnes, P. R.

    1980-01-01

    The generation process of the design of the Joint Institute for Heavy Ion Research is described. Architectural and energy considerations are discussed. The facility will contain living quarters for guest scientists who come to Oak Ridge to conduct short experiments and sleeping alcoves for local researchers on long experimental shifts as well as office space. (MHR)

  1. 46 CFR 108.239 - Fuel transfer equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Fuel transfer equipment. 108.239 Section 108.239... AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.239 Fuel transfer equipment. (a... static grounding device. (d) Each electric fuel transfer pump must have a control with a fuel transfer...

  2. 9 CFR 354.230 - Equipment and utensils.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 354.230 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... equipped with facilities for locking and sealing. (m) Freezing rooms should be adequately equipped to... constant as possible. Freezing room should be equipped with floor racks or pallets and fans to insure air...

  3. Space Station Furnace Facility. Experiment/Facility Requirements Document (E/FRD), volume 2, appendix 5

    NASA Technical Reports Server (NTRS)

    Kephart, Nancy

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidifcation conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment, and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace.

  4. 40 CFR 61.250 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.250 Section 61.250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  5. 40 CFR 61.20 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.20 Section 61.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  6. 40 CFR 61.200 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.200 Section 61.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  7. 40 CFR 61.220 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Designation of facilities. 61.220 Section 61.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  8. 40 CFR 61.20 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.20 Section 61.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  9. 40 CFR 61.250 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.250 Section 61.250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  10. 40 CFR 61.220 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.220 Section 61.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  11. 40 CFR 61.200 - Designation of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Designation of facilities. 61.200 Section 61.200 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standards for Radon...

  12. Military Handbook. Grounding, Bonding, and Shielding for Electronic Equipments and Facilities. Volume 1. Basic Theory

    DTIC Science & Technology

    1987-12-29

    when the air or gas stream contains particulate matter. b. Pulverized materials passing through chutes or pneumatic conveyors . c. Nonconductive power...Hanover NH, 1971, AD 722 221. 146.Oakley, R.J., "Surface Transfer Impedance and Cable Shielding Design ," Wire Journal, Vol 4, No. 3, March 1971, pp...including considerations of grounding, bonding, and shielding in all phases of design , construction, operation, and maintenance of electronic equipment

  13. ETF Facility evaporator skid orifice sizing design analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ELLINGSON, S.D.

    1999-08-31

    This document releases and records the design analysis for sizing the Orifice plate being installed on the Effluent Treatment Facility (ETF) evaporator skid per Engineering Change Notice (ECN) 651583.

  14. Applying Industrial Design Best Practices in the Acquisition of Soldier Equipment

    DTIC Science & Technology

    2002-03-01

    their meal when it is included. Presently, the US Army is considering a complete change of uniform if for no other reason, the soldier will feel...to increase soldier acceptance of equipment. The conclusion provides recommendations to program managers on how they can design a good product, what...

  15. 340 Facility secondary containment and leak detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bendixsen, R.B.

    1995-01-31

    This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.

  16. The use of fault reporting of medical equipment to identify latent design flaws.

    PubMed

    Flewwelling, C J; Easty, A C; Vicente, K J; Cafazzo, J A

    2014-10-01

    Poor device design that fails to adequately account for user needs, cognition, and behavior is often responsible for use errors resulting in adverse events. This poor device design is also often latent, and could be responsible for "No Fault Found" (NFF) reporting, in which medical devices sent for repair by clinical users are found to be operating as intended. Unresolved NFF reports may contribute to incident under reporting, clinical user frustration, and biomedical engineering technologist inefficacy. This study uses human factors engineering methods to investigate the relationship between NFF reporting frequency and device usability. An analysis of medical equipment maintenance data was conducted to identify devices with a high NFF reporting frequency. Subsequently, semi-structured interviews and heuristic evaluations were performed in order to identify potential usability issues. Finally, usability testing was conducted in order to validate that latent usability related design faults result in a higher frequency of NFF reporting. The analysis of medical equipment maintenance data identified six devices with a high NFF reporting frequency. Semi-structured interviews, heuristic evaluations and usability testing revealed that usability issues caused a significant portion of the NFF reports. Other factors suspected to contribute to increased NFF reporting include accessory issues, intermittent faults and environmental issues. Usability testing conducted on three of the devices revealed 23 latent usability related design faults. These findings demonstrate that latent usability related design faults manifest themselves as an increase in NFF reporting and that devices containing usability related design faults can be identified through an analysis of medical equipment maintenance data. Copyright © 2014 The Authors. Published by Elsevier Inc. All rights reserved.

  17. Evaluation of a heat exchanger for use in the Integrated Equipment Test facility solvent-extraction system

    NASA Astrophysics Data System (ADS)

    Lewis, B. E.

    1982-12-01

    The primary decontamination extraction section product (HAP) heat exchanger will be located between the extracting section (HA) and scrubbing section (HS) of centrifugal solvent extraction contactors in the Integrated Equipment Test (IET) facility. The heat exchanger is required to raise the temperature of the organic product stream from the HA contactor from 40 to 500 C. Tests were conducted under prototypic IET operating conditions to determine the head requirements for gravity flow and the overall heat transfer coefficient for the heat exchanger. Results from the tests indicated that the specified heat exchanger would perform satisfactorily under normal operating conditions.

  18. 45 CFR 1304.53 - Facilities, materials, and equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) Head Start physical environment and facilities. (1) Grantee and delegate agencies must provide a physical environment and facilities conducive to learning and reflective of the different stages of... delegate agencies must provide a center-based environment free of toxins, such as cigarette smoke, lead...

  19. HYNOL PROCESS ENGINEERING: PROCESS CONFIGURATION, SITE PLAN, AND EQUIPMENT DESIGN

    EPA Science Inventory

    The report describes the design of the hydropyrolysis reactor system of the Hynol process. (NOTE: A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the Hynol process. The plant is bein...

  20. 40 CFR 60.190 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Primary Aluminum Reduction Plants § 60.190 Applicability and designation of affected facility. (a) The affected facilities in primary aluminum reduction plants to which this subpart applies are...

  1. The status of LILW disposal facility construction in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan

    2013-07-01

    In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less

  2. Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This DOE standard gives design and evaluation criteria for natural phenomena hazards (NPH) effects as guidance for implementing the NPH mitigation requirements of DOE 5480.28. Goal of the criteria is to assure that DOE facilities can withstand the effects of earthquakes, extreme winds, tornadoes, flooding, etc. They apply to the design of new facilities and the evaluation of existing facilities; they may also be used for modification and upgrading of the latter.

  3. Effects of Psychoeducation for Offenders in a Community Correctional Facility

    ERIC Educational Resources Information Center

    Liau, Albert K.; Shively, Randy; Horn, Mary; Landau, Jennifer; Barriga, Alvaro; Gibbs, John C.

    2004-01-01

    The present study provided a randomized outcome evaluation of the psychoeducational component of the EQUIP program. The psychoeducational curriculum was implemented in a community correctional facility for adult felony offenders. The psychoeducational curriculum is designed to remedy offenders' delays in moral judgment maturity, social cognitive…

  4. 40 CFR 60.170 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Primary Zinc Smelters § 60.170 Applicability and designation of affected facility. (a) The...: roaster and sintering machine. (b) Any facility under paragraph (a) of this section that commences...

  5. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  6. Design Criteria for Controlling Stress Corrosion Cracking

    NASA Technical Reports Server (NTRS)

    Franklin, D. B.

    1987-01-01

    This document sets forth the criteria to be used in the selection of materials for space vehicles and associated equipment and facilities so that failure resulting from stress corrosion will be prevented. The requirements established herein apply to all metallic components proposed for use in space vehicles and other flight hardware, ground support equipment, and facilities for testing. These requirements are applicable not only to items designed and fabricated by MSFC (Marshall Space Flight Center) and its prime contractors, but also to items supplied to the prime contractor by subcontractors and vendors.

  7. Water facilities in retrospect and prospect: An illuminating tool for vehicle design

    NASA Technical Reports Server (NTRS)

    Erickson, G. E.; Peak, D. J.; Delfrate, J.; Skow, A. M.; Malcolm, G. N.

    1986-01-01

    Water facilities play a fundamental role in the design of air, ground, and marine vehicles by providing a qualitative, and sometimes quantitative, description of complex flow phenomena. Water tunnels, channels, and tow tanks used as flow-diagnostic tools have experienced a renaissance in recent years in response to the increased complexity of designs suitable for advanced technology vehicles. These vehicles are frequently characterized by large regions of steady and unsteady three-dimensional flow separation and ensuing vortical flows. The visualization and interpretation of the complicated fluid motions about isolated vehicle components and complete configurations in a time and cost effective manner in hydrodynamic test facilities is a key element in the development of flow control concepts, and, hence, improved vehicle designs. A historical perspective of the role of water facilities in the vehicle design process is presented. The application of water facilities to specific aerodynamic and hydrodynamic flow problems is discussed, and the strengths and limitations of these important experimental tools are emphasized.

  8. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  9. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  10. 40 CFR 60.560 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) manufacturing processes. (i) Affected facilities with a design capacity to produce less than 1,000 Mg/yr (1,102... Performance for Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry § 60.560... apply to affected facilities involved in the manufacture of polypropylene, polyethylene, polystyrene, or...

  11. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  12. 40 CFR 60.420 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Ammonium Sulfate Manufacture § 60.420 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by...

  13. 40 CFR 60.620 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Petroleum Dry Cleaners § 60.620 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities located at a petroleum dry... pounds): Petroleum solvent dry cleaning dryers, washers, filters, stills, and settling tanks. (1) When...

  14. 40 CFR 60.500 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Bulk Gasoline Terminals § 60.500 Applicability and designation of affected facility. (a) The... bulk gasoline terminal which deliver liquid product into gasoline tank trucks. (b) Each facility under... technologies (BDT). The numerical emission limits in this standard are expressed in terms of total organic...

  15. 40 CFR 60.500 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for Bulk Gasoline Terminals § 60.500 Applicability and designation of affected facility. (a) The... bulk gasoline terminal which deliver liquid product into gasoline tank trucks. (b) Each facility under... technologies (BDT). The numerical emission limits in this standard are expressed in terms of total organic...

  16. Design of a compact low-power human-computer interaction equipment for hand motion

    NASA Astrophysics Data System (ADS)

    Wu, Xianwei; Jin, Wenguang

    2017-01-01

    Human-Computer Interaction (HCI) raises demand of convenience, endurance, responsiveness and naturalness. This paper describes a design of a compact wearable low-power HCI equipment applied to gesture recognition. System combines multi-mode sense signals: the vision sense signal and the motion sense signal, and the equipment is equipped with the depth camera and the motion sensor. The dimension (40 mm × 30 mm) and structure is compact and portable after tight integration. System is built on a module layered framework, which contributes to real-time collection (60 fps), process and transmission via synchronous confusion with asynchronous concurrent collection and wireless Blue 4.0 transmission. To minimize equipment's energy consumption, system makes use of low-power components, managing peripheral state dynamically, switching into idle mode intelligently, pulse-width modulation (PWM) of the NIR LEDs of the depth camera and algorithm optimization by the motion sensor. To test this equipment's function and performance, a gesture recognition algorithm is applied to system. As the result presents, general energy consumption could be as low as 0.5 W.

  17. A button - type beam position monitor design for TARLA facility

    NASA Astrophysics Data System (ADS)

    Gündoǧan, M. Tural; Kaya, ć.; Yavaş, Ö.

    2016-03-01

    Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) facility is proposed as an IR FEL and Bremsstrahlung facility as the first facility of Turkish Accelerator Center (TAC). TARLA is essentially proposed to generate oscillator mode FEL in 3-250 microns wavelengths range, will consist of normal conducting injector system with 250 keV beam energy, two superconducting RF accelerating modules in order to accelerate the beam 15-40 MeV. The TARLA facility is expected to provide two modes, Continuous wave (CW) and pulsed mode. Longitudinal electron bunch length will be changed between 1 and 10 ps. The bunch charge will be limited by 77pC. The design of the Button-type Beam Position Monitor for TARLA IR FEL is studied to operate in 1.3 GHz. Mechanical antenna design and simulations are completed considering electron beam parameters of TARLA. Ansoft HFSS and CST Particle Studio is used to compare with results of simulations.

  18. A performance goal-based seismic design philosophy for waste repository facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hossain, Q.A.

    1994-12-31

    A performance goal-based seismic design philosophy, compatible with DOE`s present natural phenomena hazards mitigation and {open_quotes}graded approach{close_quotes} philosophy, has been proposed for high level nuclear waste repository facilities. The rationale, evolution, and the desirable features of this method have been described. Why and how the method should and can be applied to the design of a repository facility are also discussed.

  19. Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit

    NASA Astrophysics Data System (ADS)

    Gnanavel, C.; Saravanan, R.; Chandrasekaran, M.; Jayakanth, J. J.

    2017-03-01

    Measurements and improvements are very indispensable task at all levels of management. Here some samples are, at operator level: Measuring operating parameters to ensure OEE (Overall Equipment Effectiveness) and measuring Q components performance to ensure quality, at supervisory level: measuring operator’s performance to ensure labour utility at managerial level: production and productivity measurements and at top level capital and capacity utilization. An often accepted statement is “Improvement is impossible without measurement”. Measurements often referred as observation. The case study was conducted at Government Boiler factory in India. The scientific approach followed for indentifying non value added activities. Personalised new equipment designed and installed to achieve productivity improvement of 85% for a day. The new equipment can serve 360o around its axis hence it simplified loading and unloading procedures as well as reduce their times and ensured effective space and time.

  20. Harold P. Geerdes on Musical Facility Design.

    ERIC Educational Resources Information Center

    Wagner, Michael

    1996-01-01

    Presents an interview with Dr. Harold P. Geerdes, world-renowned music facility planner, acoustician, and music professor. Dr. Geerdes discusses the different characteristics of rehearsal spaces and concert halls as well as the importance of interior materials and design. He also provides some easy and inexpensive tips for schools. (MJP)

  1. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    PubMed

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  2. 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Design objectives for equipment to control releases of..., Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants § 50.34a Design objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors. (a...

  3. 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Design objectives for equipment to control releases of..., Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants § 50.34a Design objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors. (a...

  4. 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Design objectives for equipment to control releases of..., Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants § 50.34a Design objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors. (a...

  5. 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Design objectives for equipment to control releases of..., Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants § 50.34a Design objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors. (a...

  6. 10 CFR 50.34a - Design objectives for equipment to control releases of radioactive material in effluents-nuclear...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Design objectives for equipment to control releases of..., Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants § 50.34a Design objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors. (a...

  7. Orbital construction support equipment - Manned remote work station

    NASA Technical Reports Server (NTRS)

    Nassiff, S. H.

    1978-01-01

    The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

  8. Aircraft interrogation and display system: A ground support equipment for digital flight systems

    NASA Technical Reports Server (NTRS)

    Glover, R. D.

    1982-01-01

    A microprocessor-based general purpose ground support equipment for electronic systems was developed. The hardware and software are designed to permit diverse applications in support of aircraft flight systems and simulation facilities. The implementation of the hardware, the structure of the software, describes the application of the system to an ongoing research aircraft project are described.

  9. Defocusing beam line design for an irradiation facility at the TAEA SANAEM Proton Accelerator Facility

    NASA Astrophysics Data System (ADS)

    Gencer, A.; Demirköz, B.; Efthymiopoulos, I.; Yiğitoğlu, M.

    2016-07-01

    Electronic components must be tested to ensure reliable performance in high radiation environments such as Hi-Limu LHC and space. We propose a defocusing beam line to perform proton irradiation tests in Turkey. The Turkish Atomic Energy Authority SANAEM Proton Accelerator Facility was inaugurated in May 2012 for radioisotope production. The facility has also an R&D room for research purposes. The accelerator produces protons with 30 MeV kinetic energy and the beam current is variable between 10 μA and 1.2 mA. The beam kinetic energy is suitable for irradiation tests, however the beam current is high and therefore the flux must be lowered. We plan to build a defocusing beam line (DBL) in order to enlarge the beam size, reduce the flux to match the required specifications for the irradiation tests. Current design includes the beam transport and the final focusing magnets to blow up the beam. Scattering foils and a collimator is placed for the reduction of the beam flux. The DBL is designed to provide fluxes between 107 p /cm2 / s and 109 p /cm2 / s for performing irradiation tests in an area of 15.4 cm × 21.5 cm. The facility will be the first irradiation facility of its kind in Turkey.

  10. Mechanical engineering and design criteria for the Magnetically Insulated Transmission Experiment Accelerator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Staller, G.E.; Hamilton, I.D.; Aker, M.F.

    1978-02-01

    A single-unit electron beam accelerator was designed, fabricated, and assembled in Sandia's Technical Area V to conduct magnetically insulated transmission experiments. Results of these experiments will be utilized in the future design of larger, more complex accelerators. This design makes optimum use of existing facilities and equipment. When designing new components, possible future applications were considered as well as compatibility with existing facilities and hardware.

  11. 30 CFR 285.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my Facility Design Report? 285.701 Section 285.701 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... Design, Fabrication, and Installation Reports § 285.701 What must I include in my Facility Design Report...

  12. The relationship between science classroom facility conditions and ninth grade students' attitudes toward science

    NASA Astrophysics Data System (ADS)

    Ford, Angela Y.

    Over half of the school facilities in America are in poor condition. Unsatisfactory school facilities have a negative impact on teaching and learning. The purpose of this correlational study was to identify the relationship between high school science teachers' perceptions of the school science environment (instructional equipment, demonstration equipment, and physical facilities) and ninth grade students' attitudes about science through their expressed enjoyment of science, importance of time spent on science, and boredom with science. A sample of 11,523 cases was extracted, after a process of data mining, from a databank of over 24,000 nationally representative ninth graders located throughout the United States. The instrument used to survey these students was part of the High School Longitudinal Study of 2009 (HSLS:2009). The research design was multiple linear regression. The results showed a significant relationship between the science classroom conditions and students' attitudes. Demonstration equipment and physical facilities were the best predictors of effects on students' attitudes. Conclusions based on this study and recommendations for future research are made.

  13. Design of carbon therapy facility based on 10 years experience at HIMAC

    NASA Astrophysics Data System (ADS)

    Noda, K.; Furukawa, T.; Iwata, Y.; Kanai, T.; Kanazawa, M.; Kanematsu, N.; Kitagawa, A.; Komori, M.; Minohara, S.; Murakami, T.; Muramatsu, M.; Sato, S.; Sato, Y.; Shibuya, S.; Torikoshi, M.; Yamada, S.

    2006-06-01

    Since 1994, the clinical trial for cancer therapy with HIMAC has successfully progressed, and more than 2100 cancer patients have been treated with a carbon beam. Based on the development of the accelerator and irradiation technologies for 10 years, we have designed a new carbon-therapy facility for widespread use in Japan, and key technologies for the new facility have been developed. We describe the conceptual design of the new facility and the status of development for the key technologies.

  14. Design and Shielding of Radiotherapy Treatment Facilities; IPEM Report 75, 2nd Edition

    NASA Astrophysics Data System (ADS)

    Horton, Patrick; Eaton, David

    2017-07-01

    Design and Shielding of Radiotherapy Treatment Facilities provides readers with a single point of reference for protection advice to the construction and modification of radiotherapy facilities. The book assembles a faculty of national and international experts on all modalities including megavoltage and kilovoltage photons, brachytherapy and high-energy particles, and on conventional and Monte Carlo shielding calculations. This book is a comprehensive reference for qualified experts and radiation-shielding designers in radiation physics and also useful to anyone involved in the design of radiotherapy facilities.

  15. Thermal Vacuum Control Systems Options for Test Facilities

    NASA Technical Reports Server (NTRS)

    Marchetti, John

    2008-01-01

    This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.

  16. Facility Design Considerations.

    ERIC Educational Resources Information Center

    Chase, William W.

    1967-01-01

    Increasing need for vocational education under the impetus of federal aid is generating a demand for vocational teaching facilities. Factors to be considered in planning these facilities inclued--(1) site development, (2) program needs, (3) administrative considerations, (4) environmental controls. (5) mechanical systems, and (6) area and space…

  17. The Influence of Older Age Groups to Sustainable Product Design Research of Urban Public Facilities

    NASA Astrophysics Data System (ADS)

    Wen-juan, Zhang; Hou-peng, Song

    2017-01-01

    Through summarize the status quo of public facilities design to older age groups in China and a variety of factors what influence on them, the essay, from different perspective, is designed to put forward basic principle to sustainable design of public facilities for the aged in the city, and thus further promote and popularize the necessity of sustainable design applications in the future design of public facilities for elderly people.

  18. The design of components for an advanced Rankine cycle test facility.

    NASA Technical Reports Server (NTRS)

    Bond, J. A.

    1972-01-01

    The design of a facility for testing components of an advanced Rankine cycle power system is summarized. The facility is a three-loop system in which lithium, potassium and NaK-78 are the working fluids of the primary, secondary and heat-rejection loops, respectively. Design bases and performance predictions for the major loop components, including the lithium heater and the potassium boiler, condenser and preheater, are outlined.

  19. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  20. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  1. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  2. Locker Room Design Trends.

    ERIC Educational Resources Information Center

    Wiens, Janet

    2001-01-01

    Examines how today's college and university athletic locker rooms have become sophisticated recruiting tools that rival many professional facilities. Locker room design and location and their level of furniture, finishes, and equipment are discussed as is the trend for more environmentally friendly locker rooms. (GR)

  3. Explosion Clad for Upstream Oil and Gas Equipment

    NASA Astrophysics Data System (ADS)

    Banker, John G.; Massarello, Jack; Pauly, Stephane

    2011-01-01

    Today's upstream oil and gas facilities frequently involve the combination of high pressures, high temperatures, and highly corrosive environments, requiring equipment that is thick wall, corrosion resistant, and cost effective. When significant concentrations of CO2 and/or H2S and/or chlorides are present, corrosion resistant alloys (CRA) can become the material of choice for separator equipment, piping, related components, and line pipe. They can provide reliable resistance to both corrosion and hydrogen embrittlement. For these applications, the more commonly used CRA's are 316L, 317L and duplex stainless steels, alloy 825 and alloy 625, dependent upon the application and the severity of the environment. Titanium is also an exceptional choice from the technical perspective, but is less commonly used except for heat exchangers. Explosion clad offers significant savings by providing a relatively thin corrosion resistant alloy on the surface metallurgically bonded to a thick, lower cost, steel substrate for the pressure containment. Developed and industrialized in the 1960's the explosion cladding technology can be used for cladding the more commonly used nickel based and stainless steel CRA's as well as titanium. It has many years of proven experience as a reliable and highly robust clad manufacturing process. The unique cold welding characteristics of explosion cladding reduce problems of alloy sensitization and dissimilar metal incompatibility. Explosion clad materials have been used extensively in both upstream and downstream oil, gas and petrochemical facilities for well over 40 years. The explosion clad equipment has demonstrated excellent resistance to corrosion, embrittlement and disbonding. Factors critical to insure reliable clad manufacture and equipment design and fabrication are addressed.

  4. 40 CFR 60.340 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for Lime Manufacturing Plants § 60.340 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to each rotary lime kiln used in the manufacture of lime. (b) The provisions of this subpart are not applicable to facilities used in the manufacture of lime at kraft pulp...

  5. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  6. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  7. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  8. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  9. 40 CFR 60.530 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Performance for New Residential Wood Heaters § 60.530 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wood heater manufactured... do not apply to wood heaters constructed prior to July 1, 1988, that are or have been owned by a...

  10. Computational Tools and Facilities for the Next-Generation Analysis and Design Environment

    NASA Technical Reports Server (NTRS)

    Noor, Ahmed K. (Compiler); Malone, John B. (Compiler)

    1997-01-01

    This document contains presentations from the joint UVA/NASA Workshop on Computational Tools and Facilities for the Next-Generation Analysis and Design Environment held at the Virginia Consortium of Engineering and Science Universities in Hampton, Virginia on September 17-18, 1996. The presentations focused on the computational tools and facilities for analysis and design of engineering systems, including, real-time simulations, immersive systems, collaborative engineering environment, Web-based tools and interactive media for technical training. Workshop attendees represented NASA, commercial software developers, the aerospace industry, government labs, and academia. The workshop objectives were to assess the level of maturity of a number of computational tools and facilities and their potential for application to the next-generation integrated design environment.

  11. 23 CFR 810.108 - Designation of existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....108 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway... designate existing parking facilities (such as at shopping centers or other public or private locations) for...

  12. Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soli Khericha; Edwin Harvego; John Svoboda

    2012-01-01

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less

  13. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  14. Methodological framework for the ergonomic design of children's playground equipment: a Serbian experience.

    PubMed

    Grozdanovic, Miroljub; Jekic, Savko; Stojiljkovic, Evica

    2014-01-01

    Adequate application of the static and dynamic anthropometric measures of pre-school children in ergonometric design of children's playground equipment should eliminate all dangers and difficulties in their use. Possibilities of injuries, insecure movements, discomfort able positions and some other dangerous actions may be minimized; and safety and health protection of pre-school children will be increased. Children's playground represents a significant space of activity for pre-school children. Therefore, it is necessary to apply ergonomic principles which contribute to the adjustment of the playground elements to children's anatomic features. Based on the results presented in this paper, new constructions were designed and new playgrounds were installed in Serbia. Participants were children from three pre-school age groups: Junior age group (3-4 years of age, 17 children), Medium age group (4-5 years of age, 22 children), and Senior age group (5-6 years of age, 26 children). Thirty-one static anthropometric measures (12 in standing position, 11 in sitting position, 7 related to dimensions of hand, foot an head, with body weight and shoe size) and 15 dynamic anthropometric measures (7 in standing position, 6 in sitting position and 2 dimension of foot and hand) were defined for the study. Measurements were taken using an anthrop-meter, a flexible measuring tape. Equations for ergonomic design of children's playground elements were also defined. Basic statistical data of static and dynamic anthropometric measurements of the pre-school children are presented in this paper, as well as the statistical calculation of the corrective anthropometric measurements. Measurements were performed in "Poletarac" kindergarten, part of the pre-school institution "Radost" in Cacak. Elements of playground equipment in "Bambi" kindergarten in Kragujevac (the Indian tent "wigwam", gate-house, swing and carousel) were designed and built using these parameters. Based on the obtained

  15. 75 FR 66683 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... operation of facilities, infrastructure, and equipment for use by DoD military or civilian should be...-7004, Safety of Facilities, Infrastructure, and Equipment for Military Operations. DFARS 246.270-1... operation of facilities. This includes contracts for facilities, infrastructure, and equipment configured...

  16. Conceptual design for the Space Station Freedom fluid physics/dynamics facility

    NASA Technical Reports Server (NTRS)

    Thompson, Robert L.; Chucksa, Ronald J.; Omalley, Terence F.; Oeftering, Richard C.

    1993-01-01

    A study team at NASA's Lewis Research Center has been working on a definition study and conceptual design for a fluid physics and dynamics science facility that will be located in the Space Station Freedom's baseline U.S. Laboratory module. This modular, user-friendly facility, called the Fluid Physics/Dynamics Facility, will be available for use by industry, academic, and government research communities in the late 1990's. The Facility will support research experiments dealing with the study of fluid physics and dynamics phenomena. Because of the lack of gravity-induced convection, research into the mechanisms of fluids in the absence of gravity will help to provide a better understanding of the fundamentals of fluid processes. This document has been prepared as a final version of the handout for reviewers at the Fluid Physics/Dynamics Facility Assessment Workshop held at Lewis on January 24 and 25, 1990. It covers the background, current status, and future activities of the Lewis Project Study Team effort. It is a revised and updated version of a document entitled 'Status Report on the Conceptual Design for the Space Station Fluid Physics/Dynamics Facility', dated January 1990.

  17. Design handbook : energy efficiency and water conservation in NAS facilities

    DOT National Transportation Integrated Search

    1997-09-30

    This handbook was created to provide definitive energy efficiency and water conservation design criteria for the design of NAS facilities. FAA-HDBK-001 provides implementation strategies and tools to comply with E.O. 12902, Energy and Water Conservat...

  18. Automated space processing payloads study. Volume 3: Equipment development resource requirements. [instrument packages and the space shuttles

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.

  19. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  20. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  1. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    NASA Technical Reports Server (NTRS)

    Chakrabarti, Suman

    2010-01-01

    The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of

  2. 76 FR 14590 - Defense Federal Acquisition Regulation Supplement; Safety of Facilities, Infrastructure, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... facilities, infrastructure, and equipment that are intended for use by military or civilian personnel of the..., maintenance, or operation of facilities, infrastructure, and equipment for use by DoD military or civilian... facilities. This includes contracts for facilities, infrastructure, and equipment configured for occupancy...

  3. Literature Related to Planning, Design and Construction of Science Facilities.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A list of the articles and papers in the science facilities collection of the Architectural Services Staff is presented. It has been prepared to serve as a bibliography that may be useful to persons searching for data on the design of science facilities, and as a means of informing such persons of the material available for reference in the…

  4. Space processing applications payload equipment study. Volume 2E: Commercial equipment utility

    NASA Technical Reports Server (NTRS)

    Smith, A. G. (Editor)

    1974-01-01

    Examination of commercial equipment technologies revealed that the functional performance requirements of space processing equipment could generally be met by state-of-the-art design practices. Thus, an apparatus could be evolved from a standard item or derived by custom design using present technologies. About 15 percent of the equipment needed has no analogous commercial base of derivation and requires special development. This equipment is involved primarily with contactless heating and position control. The derivation of payloads using commercial equipment sources provides a broad and potentially cost-effective base upon which to draw. The derivation of payload equipment from commercial technologies poses other issues beyond that of the identifiable functional performance, but preliminary results on testing of selected equipment testing appear quite favorable. During this phase of the SPA study, several aspects of commercial equipment utility were assessed and considered. These included safety, packaging and structural, power conditioning (electrical/electronic), thermal and materials of construction.

  5. Barriers to providing palliative care in long-term care facilities

    PubMed Central

    Brazil, Kevin; Bédard, Michel; Krueger, Paul; Taniguchi, Alan; Kelley, Mary Lou; McAiney, Carrie; Justice, Christopher

    2006-01-01

    OBJECTIVE To assess challenges in providing palliative care in long-term care (LTC) facilities from the perspective of medical directors. DESIGN Cross-sectional mailed survey. A questionnaire was developed, reviewed, pilot-tested, and sent to 450 medical directors representing 531 LTC facilities. Responses were rated on 2 different 5-point scales. Descriptive analyses were conducted on all responses. SETTING All licensed LTC facilities in Ontario with designated medical directors. PARTICIPANTS Medical directors in the facilities. MAIN OUTCOME MEASURES Demographic and practice characteristics of physicians and facilities, importance of potential barriers to providing palliative care, strategies that could be helpful in providing palliative care, and the kind of training in palliative care respondents had received. RESULTS Two hundred seventy-five medical directors (61%) representing 302 LTC facilities (57%) responded to the survey. Potential barriers to providing palliative care were clustered into 3 groups: facility staff’s capacity to provide palliative care, education and support, and the need for external resources. Two thirds of respondents (67.1%) reported that inadequate staffing in their facilities was an important barrier to providing palliative care. Other barriers included inadequate financial reimbursement from the Ontario Health Insurance Program (58.5%), the heavy time commitment required (47.3%), and the lack of equipment in facilities (42.5%). No statistically significant relationship was found between geographic location or profit status of facilities and barriers to providing palliative care. Strategies respondents would use to improve provision of palliative care included continuing medical education (80.0%), protocols for assessing and monitoring pain (77.7%), finding ways to increase financial reimbursement for managing palliative care residents (72.1%), providing educational material for facility staff (70.7%), and providing practice

  6. Facilities for Biological Research Aboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Souza, Kenneth A.; Yost, Bruce D.; Berry, William E.; Johnson, Catherine C.

    1996-01-01

    A centrifuge designed as part of an integrated biological facility for installation onboard the International Space Station is presented. The requirements for the 2.5 m diameter centrifuge, which is designed for the support of biological experiments are discussed. The scientific objectives of the facility are to: provide a means of conducting fundamental studies in which gravitational acceleration is a controllable variable; provide a 1g control; determine the threshold acceleration for physiological response, and determine the value of centrifugation as a potential countermeasure for the biomedical problems associated with space flight. The implementation of the facility is reported on, and the following aspects of the facility are described: the host resources systems supply requirements such as power and data control; the habitat holding rack; the life sciences glove box; the centrifuge; the different habitats for cell culture, aquatic studies, plant research and insect research; the egg incubator, and the laboratory support equipment.

  7. The ESA Laboratory Support Equipment for the ISS.

    PubMed

    Petrivelli, A

    2002-02-01

    The Laboratory Support Equipment (LSE) for the International Space Station (ISS) is a suite of general-purpose items that will be available onboard the Station either as self-standing facilities or as equipment that can be used at defined locations. Dedicated to supporting system maintenance and payload operations, some LSE items are derived from commercial equipment, while others have been specifically developed for the ISS. ESA is currently engaged in developing three pressurised facilities and one pointing mechanism that will become part of the LSE complement, namely: the Minus Eighty degree centigrade Laboratory Freezer for the ISS (MELFI), the Microgravity Science Glovebox (MSG), the cryogenic storage and quick/snap freezer system (Cryosystem), the external-payload pointing system (Hexapod).

  8. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  9. Use of personal protective equipment for respiratory protection.

    PubMed

    Sargent, Edward V; Gallo, Frank

    2003-01-01

    Management of hazards in biomedical research facilities requires the application of the traditional industrial hygiene responsibilities of anticipation, recognition, evaluation, and control to characterize the work environment, evaluate tasks and equipment, identify hazards, define exposure groups, and recommend controls. Generally, the diversity and unique characteristics of hazards faced by laboratory and animal facility employees and the short-term and low-level nature of the exposures factor into the selection of proper exposure control measures in the laboratory. The proper selection of control measures is based on a hierarchy of elimination and minimization by engineering controls, followed last by personal protective equipment when exposures cannot be eliminated. Once it is decided that personal protective equipment is needed, specific regulations and guidelines define safety standards for research facilities, including the elements of a sound respiratory protection program. These elements include respirator selection (including appropriate protection factors), medical evaluation, fit testing, training, inspection, maintenance and care, quality, quantity and flow of breathing air, and routine and emergency use procedures.

  10. First Facility Utilization Manual. A Teachers Guide to the Use of the FLNT Elementary School. Fort Lincoln New Town Education System.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    This guide endeavors to teach the faculty how to manipulate the structure of the new facility in the most creative way. The first chapters discuss the interior design, graphic considerations within the facility, materials and equipment suited for open space schools, and recommended audio-systems. Later chapters cover the exterior facilities, such…

  11. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Astrophysics Data System (ADS)

    1992-05-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  12. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  13. MIMI: multimodality, multiresource, information integration environment for biomedical core facilities.

    PubMed

    Szymanski, Jacek; Wilson, David L; Zhang, Guo-Qiang

    2009-10-01

    The rapid expansion of biomedical research has brought substantial scientific and administrative data management challenges to modern core facilities. Scientifically, a core facility must be able to manage experimental workflow and the corresponding set of large and complex scientific data. It must also disseminate experimental data to relevant researchers in a secure and expedient manner that facilitates collaboration and provides support for data interpretation and analysis. Administratively, a core facility must be able to manage the scheduling of its equipment and to maintain a flexible and effective billing system to track material, resource, and personnel costs and charge for services to sustain its operation. It must also have the ability to regularly monitor the usage and performance of its equipment and to provide summary statistics on resources spent on different categories of research. To address these informatics challenges, we introduce a comprehensive system called MIMI (multimodality, multiresource, information integration environment) that integrates the administrative and scientific support of a core facility into a single web-based environment. We report the design, development, and deployment experience of a baseline MIMI system at an imaging core facility and discuss the general applicability of such a system in other types of core facilities. These initial results suggest that MIMI will be a unique, cost-effective approach to addressing the informatics infrastructure needs of core facilities and similar research laboratories.

  14. Equipment damper original design and qualification results

    NASA Astrophysics Data System (ADS)

    Demerville, T.; Guay, P.

    2003-09-01

    During the launching phase, satellites are undoubtedly faced to severe mechanical environment, which appears to be one of the most critical issues to cope with. Various solutions can be investigated to protect the onboard equipments during these critical phases. Actually, theses vibratory damages can be reduced at the same time by optimising the architecture of the satellite but also by local actions aiming more on the propagation of the vibrations and thus limiting the transmission of the vibrations through the whole equipment. The latter solution also called "passive solution" is developed by SMAC under the CNES contract to protect along all six degree of freedom the small reaction wheel, chosen for the MYRIADE microsatellite family, from random vibrations and shocks. This original solution consists in uncoupling the reaction wheel from the satellite structure by an isolator system made out of a high damping viscoelastic material: the SMACTANE®. Technical trade-off and design issue, that has led to select the final flight configuration, will be discussed in parallel with the design constraints in term of: mass and size, due to the lack of space onboard MYRIADE platform, and transfer function performances, addressing low cut-off frequency and quality-factor limitation at cut-off frequency. In particular, the solution implemented in order to minimize coupling phenomenon between axis will be particularly described. Main features of the flight models and the qualification tests results will be given. Despite many advantages, it is well known that damping viscoelastic materials have some disadvantages, like their non-linear behaviour depending on the mechanical levels applied and their poor thermal and electric conductivity. So, to conclude, we try to show how new ways seem to be promising and keep all interest in using viscoelastic materials in space applications. On the one hand, the way to specify the damping performances and to characterize them will be in

  15. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2010-01-01

    The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. An engineering unit, the ASRG engineering unit (EU), was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently under extended operation test at the NASA Glenn Research Center (GRC) to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for the ASRG EU. This paper summarizes details of the test facility design, including the mechanical mounting, heat-rejection system, argon system, control systems, and maintenance. The effort proceeded from requirements definition through design, analysis, build, and test. Initial testing and facility performance results are discussed.

  16. Conceptual design for the space station Freedom modular combustion facility

    NASA Technical Reports Server (NTRS)

    1989-01-01

    A definition study and conceptual design for a combustion science facility that will be located in the Space Station Freedom's baseline U.S. Laboratory module is being performed. This modular, user-friendly facility, called the Modular Combustion Facility, will be available for use by industry, academic, and government research communities in the mid-1990's. The Facility will support research experiments dealing with the study of combustion and its byproducts. Because of the lack of gravity-induced convection, research into the mechanisms of combustion in the absence of gravity will help to provide a better understanding of the fundamentals of the combustion process. The background, current status, and future activities of the effort are covered.

  17. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  18. 26 CFR 49.4252-7 - Wire and equipment service.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Wire and equipment service. 49.4252-7 Section 49... EXCISE TAXES FACILITIES AND SERVICES EXCISE TAXES Communications § 49.4252-7 Wire and equipment service. (a) In general. The term “wire and equipment service” includes stock quotation and information...

  19. 26 CFR 49.4252-7 - Wire and equipment service.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 16 2011-04-01 2011-04-01 false Wire and equipment service. 49.4252-7 Section...) MISCELLANEOUS EXCISE TAXES FACILITIES AND SERVICES EXCISE TAXES Communications § 49.4252-7 Wire and equipment service. (a) In general. The term “wire and equipment service” includes stock quotation and information...

  20. Design of efficient and simple interface testing equipment for opto-electric tracking system

    NASA Astrophysics Data System (ADS)

    Liu, Qiong; Deng, Chao; Tian, Jing; Mao, Yao

    2016-10-01

    Interface testing for opto-electric tracking system is one important work to assure system running performance, aiming to verify the design result of every electronic interface matching the communication protocols or not, by different levels. Opto-electric tracking system nowadays is more complicated, composed of many functional units. Usually, interface testing is executed between units manufactured completely, highly depending on unit design and manufacture progress as well as relative people. As a result, it always takes days or weeks, inefficiently. To solve the problem, this paper promotes an efficient and simple interface testing equipment for opto-electric tracking system, consisting of optional interface circuit card, processor and test program. The hardware cards provide matched hardware interface(s), easily offered from hardware engineer. Automatic code generation technique is imported, providing adaption to new communication protocols. Automatic acquiring items, automatic constructing code architecture and automatic encoding are used to form a new program quickly with adaption. After simple steps, a standard customized new interface testing equipment with matching test program and interface(s) is ready for a waiting-test system in minutes. The efficient and simple interface testing equipment for opto-electric tracking system has worked for many opto-electric tracking system to test entire or part interfaces, reducing test time from days to hours, greatly improving test efficiency, with high software quality and stability, without manual coding. Used as a common tool, the efficient and simple interface testing equipment for opto-electric tracking system promoted by this paper has changed traditional interface testing method and created much higher efficiency.

  1. Modelling Pedestrian Travel Time and the Design of Facilities: A Queuing Approach

    PubMed Central

    Rahman, Khalidur; Abdul Ghani, Noraida; Abdulbasah Kamil, Anton; Mustafa, Adli; Kabir Chowdhury, Md. Ahmed

    2013-01-01

    Pedestrian movements are the consequence of several complex and stochastic facts. The modelling of pedestrian movements and the ability to predict the travel time are useful for evaluating the performance of a pedestrian facility. However, only a few studies can be found that incorporate the design of the facility, local pedestrian body dimensions, the delay experienced by the pedestrians, and level of service to the pedestrian movements. In this paper, a queuing based analytical model is developed as a function of relevant determinants and functional factors to predict the travel time on pedestrian facilities. The model can be used to assess the overall serving rate or performance of a facility layout and correlate it to the level of service that is possible to provide the pedestrians. It has also the ability to provide a clear suggestion on the designing and sizing of pedestrian facilities. The model is empirically validated and is found to be a robust tool to understand how well a particular walking facility makes possible comfort and convenient pedestrian movements. The sensitivity analysis is also performed to see the impact of some crucial parameters of the developed model on the performance of pedestrian facilities. PMID:23691055

  2. 40 CFR 60.370 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Applicability and designation of affected facility. 60.370 Section 60.370 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Lead-Acid Battery Manufacturing Plants § 60.370 Applicability and designation of affected...

  3. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  4. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  5. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  6. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  7. 46 CFR 153.484 - Prewash equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...

  8. Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, July 1--September 30, 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berglund, T.; Ranney, J.T.; Babb, C.L.

    2000-10-01

    The initial design criteria of the MSW to ethanol facility have been completed along with preliminary site identification and layouts for the processing facility. These items are the first step in evaluating the feasibility of this co-located facility. Pilot facility design and modification are underway for the production and dewatering of the lignin fuel. Major process equipment identification has been completed and several key unit operations will be accomplished on rental equipment. Equipment not available for rental or at TVA has been ordered and facility modification and shakedown will begin in October. The study of the interface and resulting impactsmore » on the TVA Colbert facility are underway. The TVA Colbert fossil plant is fully capable of providing a reliable steam supply for the proposed Masada waste processing facility. The preferred supply location in the Colbert steam cycle has been identified as have possible steam pipeline routes to the Colbert boundary. Additional analysis is underway to fully predict the impact of the steam supply on Colbert plant performance and to select a final steam pipeline route.« less

  9. The Berkeley extreme ultraviolet calibration facility

    NASA Technical Reports Server (NTRS)

    Welsh, Barry Y.; Jelinsky, Patrick; Malina, Roger F.

    1988-01-01

    The vacuum calibration facilities of the Space Sciences Laboratory, University of California at Berkeley are designed for the calibration and testing of EUV and FUV spaceborne instrumentation (spectral range 44-2500 A). The facility includes one large cylindrical vacuum chamber (3 x 5 m) containing two EUV collimators, and it is equipped with a 4-axis manipulator of angular-control resolution 1 arcsec for payloads weighing up to 500 kg. In addition, two smaller cylindrical chambers, each 0.9 x 1.2 m, are available for vacuum and thermal testing of UV detectors, filters, and space electronics hardware. All three chambers open into class-10,000 clean rooms, and all calibrations are referred to NBS secondary standards.

  10. Orbiter processing facility: Access platforms Kennedy Space Center, Florida, from challenge to achievement

    NASA Technical Reports Server (NTRS)

    Haratunian, M.

    1985-01-01

    A system of access platforms and equipment within the space shuttle orbiter processing facility at Kennedy Space Center is described. The design challenges of the platforms, including clearance envelopes, load criteria, and movement, are discussed. Various applications of moveable platforms are considered.

  11. Variations in status of preparation of personal protective equipment for preventing norovirus gastroenteritis in long-term care facilities for the elderly.

    PubMed

    Fujiki, Saori; Ishizaki, Tatsuro; Nakayama, Takeo

    2017-12-01

    Residents of long-term care facilities are highly susceptible to norovirus gastroenteritis, and each facility is concerned about the need to implement norovirus infection control. Among control measures, personal protective equipment (PPE), such as disposable gloves and masks, plays a major role in reducing infectious spread. However, the preparation status of PPE in facilities before infection outbreaks has not been reported. The aim was to clarify the implementation status of preventive measures for norovirus gastroenteritis and the cost of preparing the necessary PPE in long-term care facilities. A questionnaire survey of facilities affiliated with the Kyoto Prefecture and Osaka Prefecture branches of the Japan Association of Geriatric Health Services Facilities was conducted. The survey items were the characteristics of the facility, whether preventive measures had been implemented for norovirus gastroenteritis from October through the following March in both 2009 and 2010, and the quantities and unit prices of PPE prepared for preventive measures. Twenty-six (11.2%) of 232 surveyed facilities (as of August 2011) answered the survey. Among them, 24 (92.3%) in 2009 and 25 (96.2%) in 2010 reported having implemented preventive measures for norovirus gastroenteritis, while 21 facilities (80.8%) in 2009 and 22 facilities (84.6%) in 2010 had prepared PPE. The median total cost for preparing the PPE needed for the preventive measures was US $2601 (range US $221-9192) in 2009 and US $3904 (range US $305-6427) in 2010. Although the results need careful interpretation because of the low response rate, most of the surveyed long-term care facilities had implemented preventive measures for norovirus gastroenteritis. However, the cost of preparing the PPE needed for the preventive measures varied among the facilities. © 2017 John Wiley & Sons, Ltd.

  12. Height, fun and safety in the design of children's playground equipment.

    PubMed

    Wakes, Sarah; Beukes, Amanda

    2012-01-01

    The study reported in this paper adopted a holistic design approach to investigate issues associated with height related playground injuries from a users' perspective. The main objective was to gain an understanding of the relationship between height and fun so as to establish practical guidelines for addressing the causes of height related injuries whilst maintaining the attributes of playground equipment that children find fun and challenging. Results show that, on the one hand, the risk of injury increases when height is coupled with the use of upper body strength and, on the other hand, that coordination is a greater source of fun and challenge than height for children. Accordingly, it is suggested that the level of risk of injury attached to children's playground equipment can be reduced when the use of lower body strength and coordination are combined with lower free fall heights.

  13. Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, Don; Barton, David; Case, Glenn

    2013-07-01

    The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibilitymore » for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary

  14. Understanding facilities design parameters for a remanufacturing system

    NASA Astrophysics Data System (ADS)

    Topcu, Aysegul; Cullinane, Thomas

    2005-11-01

    Remanufacturing is rapidly becoming a very important element in the economies of the world. Products such as washing machines, clothes driers, automobile parts, cell phones and a wide range of consumer durable goods are being reclaimed and sent through processes that restore these products to levels of operating performance that are as good or better than their new product performance. The operations involved in the remanufacturing process add several new dimensions to the work that must be performed. Disassembly is an operation that rarely appears on the operations chart of a typical production facility. The inspection and test functions in remanufacturing most often involve several more tasks than those involved in the first time manufacturing cycle. A close evaluation of most any remanufacturing operation reveals several points in the process in which parts must be cleaned, tested and stored. Although several researchers have focused their work on optimizing the disassembly function and the inspection, test and store functions, very little research has been devoted to studying the impact of the facilities design on the effectiveness of the remanufacturing process. The purpose of this paper will be to delineate the differences between first time manufacturing operations and remanufacturing operations for durable goods and to identify the features of the facilities design that must be considered if the remanufacturing operations are to be effective.

  15. 20 CFR 416.1023 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Facilities. 416.1023 Section 416.1023... Facilities. (a) Space, equipment, supplies, and other services. Subject to appropriate Federal funding, the... and prompt disability determinations. (b) Location of facilities. Subject to appropriate Federal...

  16. Design and performance of vacuum system for high heat flux test facility

    NASA Astrophysics Data System (ADS)

    Swamy Kidambi, Rajamannar; Mokaria, Prakash; Khirwadkar, Samir; Belsare, Sunil; Khan, M. S.; Patel, Tushar; Krishnan, Deepu S.

    2017-04-01

    High heat flux test facility (HHFTF) at IPR is used for testing thermal performance of plasma facing materials or components. It consists of various subsystems like vacuum system, high power electron beam system, diagnostic and calibration system, data acquisition and control system and high pressure high temperature water circulation system. Vacuum system consists of large D-shaped chamber, target handling system, pumping systems and support structure. The net volume of vacuum chamber is 5 m3 was maintained at the base pressure of the order of 10-6 mbar for operation of electron gun with minimum beam diameter which is achieved with turbo-molecular pump (TMP) and cryo pump. A variable conductance gate valve is used for maintaining required vacuum in the chamber. Initial pumping of the chamber was carried out by using suitable rotary and root pumps. PXI and PLC based faster real time data acquisition and control system is implemented for performing the various operations like remote operation, online vacuum data measurements, display and status indication of all vacuum equipments. This paper describes in detail the design and implementation of various vacuum system for HHFTF.

  17. Mortality monitoring design for utility-scale solar power facilities

    USGS Publications Warehouse

    Huso, Manuela; Dietsch, Thomas; Nicolai, Chris

    2016-05-27

    IntroductionSolar power represents an important and rapidly expanding component of the renewable energy portfolio of the United States (Lovich and Ennen, 2011; Hernandez and others, 2014). Understanding the impacts of renewable energy development on wildlife is a priority for the U.S. Fish and Wildlife Service (FWS) in compliance with Department of Interior Order No. 3285 (U.S. Department of the Interior, 2009) to “develop best management practices for renewable energy and transmission projects on the public lands to ensure the most environmentally responsible development and delivery of renewable energy.” Recent studies examining effects of renewable energy development on mortality of migratory birds have primarily focused on wind energy (California Energy Commission and California Department of Fish and Game, 2007), and in 2012 the FWS published guidance for addressing wildlife conservation concerns at all stages of land-based wind energy development (U.S. Fish and Wildlife Service, 2012). As yet, no similar guidelines exist for solar development, and no published studies have directly addressed the methodology needed to accurately estimate mortality of birds and bats at solar facilities. In the absence of such guidelines, ad hoc methodologies applied to solar energy projects may lead to estimates of wildlife mortality rates that are insufficiently accurate and precise to meaningfully inform conversations regarding unintended consequences of this energy source and management decisions to mitigate impacts. Although significant advances in monitoring protocols for wind facilities have been made in recent years, there remains a need to provide consistent guidance and study design to quantify mortality of bats, and resident and migrating birds at solar power facilities (Walston and others, 2015).In this document, we suggest methods for mortality monitoring at solar facilities that are based on current methods used at wind power facilities but adapted for the

  18. MAN-004 Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-07-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  19. Planning and Designing School Computer Facilities. Interim Report.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Finance and Administration Div.

    This publication provides suggestions and considerations that may be useful for school jurisdictions developing facilities for computers in schools. An interim report for both use and review, it is intended to assist school system planners in clarifying the specifications needed by the architects, other design consultants, and purchasers involved.…

  20. Concept design theory and model for multi-use space facilities: Analysis of key system design parameters through variance of mission requirements

    NASA Astrophysics Data System (ADS)

    Reynerson, Charles Martin

    This research has been performed to create concept design and economic feasibility data for space business parks. A space business park is a commercially run multi-use space station facility designed for use by a wide variety of customers. Both space hardware and crew are considered as revenue producing payloads. Examples of commercial markets may include biological and materials research, processing, and production, space tourism habitats, and satellite maintenance and resupply depots. This research develops a design methodology and an analytical tool to create feasible preliminary design information for space business parks. The design tool is validated against a number of real facility designs. Appropriate model variables are adjusted to ensure that statistical approximations are valid for subsequent analyses. The tool is used to analyze the effect of various payload requirements on the size, weight and power of the facility. The approach for the analytical tool was to input potential payloads as simple requirements, such as volume, weight, power, crew size, and endurance. In creating the theory, basic principles are used and combined with parametric estimation of data when necessary. Key system parameters are identified for overall system design. Typical ranges for these key parameters are identified based on real human spaceflight systems. To connect the economics to design, a life-cycle cost model is created based upon facility mass. This rough cost model estimates potential return on investments, initial investment requirements and number of years to return on the initial investment. Example cases are analyzed for both performance and cost driven requirements for space hotels, microgravity processing facilities, and multi-use facilities. In combining both engineering and economic models, a design-to-cost methodology is created for more accurately estimating the commercial viability for multiple space business park markets.

  1. Web-Based Requesting and Scheduling Use of Facilities

    NASA Technical Reports Server (NTRS)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  2. Preliminary Solar Sail Design and Fabrication Assessment: Spinning Sail Blade, Square Sail Sheet

    NASA Technical Reports Server (NTRS)

    Daniels, J. B.; Dowdle, D. M.; Hahn, D. W.; Hildreth, E. N.; Lagerquist, D. R.; Mahagnoul, E. J.; Munson, J. B.; Origer, T. F.

    1977-01-01

    The designs and fabrication methods, equipment, facilities, economics, and schedules, for the square sail sheet alternate are evaluated. The baseline for the spinning sail blade design and related fabrication issues are assessed.

  3. Shell Chemical LP To Install $10 Million In Pollution Monitoring And Control Equipment At Norco Chemical Facility In Louisiana To Resolve Alleged Federal And State Clean Air Violations

    EPA Pesticide Factsheets

    EPA News Release: Shell Chemical LP To Install $10 Million In Pollution Monitoring And Control Equipment At Norco Chemical Facility In Louisiana To Resolve Alleged Federal And State Clean Air Violations

  4. Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE): Conceptual Design Report. Volume 3: Long-Baseline Neutrino Facility for DUNE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strait, James; McCluskey, Elaine; Lundin, Tracy

    2016-01-21

    This volume of the LBNF/DUNE Conceptual Design Report covers the Long-Baseline Neutrino Facility for DUNE and describes the LBNF Project, which includes design and construction of the beamline at Fermilab, the conventional facilities at both Fermilab and SURF, and the cryostat and cryogenics infrastructure required for the DUNE far detector.

  5. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  6. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  7. Integration and use of Microgravity Research Facility: Lessons learned by the crystals by vapor transport experiment and Space Experiments Facility programs

    NASA Technical Reports Server (NTRS)

    Heizer, Barbara L.

    1992-01-01

    The Crystals by Vapor Transport Experiment (CVTE) and Space Experiments Facility (SEF) are materials processing facilities designed and built for use on the Space Shuttle mid deck. The CVTE was built as a commercial facility owned by the Boeing Company. The SEF was built under contract to the UAH Center for Commercial Development of Space (CCDS). Both facilities include up to three furnaces capable of reaching 850 C minimum, stand-alone electronics and software, and independent cooling control. In addition, the CVTE includes a dedicated stowage locker for cameras, a laptop computer, and other ancillary equipment. Both systems are designed to fly in a Middeck Accommodations Rack (MAR), though the SEF is currently being integrated into a Spacehab rack. The CVTE hardware includes two transparent furnaces capable of achieving temperatures in the 850 to 870 C range. The transparent feature allows scientists/astronauts to directly observe and affect crystal growth both on the ground and in space. Cameras mounted to the rack provide photodocumentation of the crystal growth. The basic design of the furnace allows for modification to accommodate techniques other than vapor crystal growth. Early in the CVTE program, the decision was made to assign a principal scientist to develop the experiment plan, affect the hardware/software design, run the ground and flight research effort, and interface with the scientific community. The principal scientist is responsible to the program manager and is a critical member of the engineering development team. As a result of this decision, the hardware/experiment requirements were established in such a way as to balance the engineering and science demands on the equipment. Program schedules for hardware development, experiment definition and material selection, flight operations development and crew training, both ground support and astronauts, were all planned and carried out with the understanding that the success of the program science

  8. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    NASA Technical Reports Server (NTRS)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  9. Conceptualization and design of a variable-gravity research facility

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The goal is to provide facilities for the study of the effects of variable-gravity levels in reducing the physiological stresses upon the humans of long-term stay time in zero-g. The designs studied include: twin-tethered two module system with a central despun module with docking port and winch gear; and rigid arm tube facility using shuttle external tanks. Topics examined included: despun central capsule configuration, docking clearances, EVA requirements, crew selection, crew scheduling, food supply and preparation, waste handling, leisure use, biomedical issues, and psycho-social issues.

  10. 30 CFR 285.707 - What are the CVA's primary duties for facility design review?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... design review? 285.707 Section 285.707 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified Verification Agent § 285.707 What are the CVA's...

  11. Poster - Thur Eve - 02: Regulatory oversight of the robotic radiosurgery facilities.

    PubMed

    Broda, K

    2012-07-01

    Following a recent review of the Class II Nuclear Facilities and Prescribed Equipment Regulations and regulatory oversight of particle accelerators, the Canadian Nuclear Safety Commission (CNSC) has changed its policy concerning the regulation of particle accelerators. In November 2011, the CNSC began to exercise its regulatory authority with respect to all particle accelerators operating at a beam energy of 1 (one) MeV or greater. The CNSC already licences and inspects particle accelerators capable of operating at or above 10 MeV. The decision to now include low energy particle accelerators (i.e., those operating at or above 1 MeV) ensures adequate, uniform and consistent regulatory oversight for all Class II accelerators. The CNSC expects these facilities to comply with CNSC requirements by December 2013. Besides conventional linear accelerators of lower energy (6 MeV or below) typically found in cancer clinics, two types of equipment now fall under the CNSC's regulatory oversight as a result of the above change: robotic radiosurgery and tomotherapy equipment and facilities. A number of clinics in Canada already operates these types of equipment and facilities. The safety aspects of radiosurgery equipment differ slightly from those for conventional linear accelerators. This poster aims to present an approach taken by the CNSC to regulate robotic radiosurgery equipment and facilities. The presentation will explain how to meet regulatory requirements of the Class II Nuclear Facilities and Prescribed Equipment Regulations by licensees operating or planning to acquire these types of equipment and facilities. © 2012 American Association of Physicists in Medicine.

  12. Grout Isolation and Stabilization of Structures and Materials within Nuclear Facilities at the U.S. Department of Energy, Hanford Site, Summary - 12309

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, S.J.; Phillips, M.; Etheridge, D.

    2012-07-01

    Per regulatory agreement and facility closure design, U.S. Department of Energy Hanford Site nuclear fuel cycle structures and materials require in situ isolation in perpetuity and/or interim physicochemical stabilization as a part of final disposal or interim waste removal, respectively. To this end, grout materials are being used to encase facilities structures or are being incorporated within structures containing hazardous and radioactive contaminants. Facilities where grout materials have been recently used for isolation and stabilization include: (1) spent fuel separations, (2) uranium trioxide calcining, (3) reactor fuel storage basin, (4) reactor fuel cooling basin transport rail tanker cars and casks,more » (5) cold vacuum drying and reactor fuel load-out, and (6) plutonium fuel metal finishing. Grout components primarily include: (1) portland cement, (2) fly ash, (3) aggregate, and (4) chemical admixtures. Mix designs for these typically include aggregate and non aggregate slurries and bulk powders. Placement equipment includes: (1) concrete piston line pump or boom pump truck for grout slurry, (2) progressive cavity and shearing vortex pump systems, and (3) extendable boom fork lift for bulk powder dry grout mix. Grout slurries placed within the interior of facilities were typically conveyed utilizing large diameter slick line and the equivalent diameter flexible high pressure concrete conveyance hose. Other facilities requirements dictated use of much smaller diameter flexible grout conveyance hose. Placement required direct operator location within facilities structures in most cases, whereas due to radiological dose concerns, placement has also been completed remotely with significant standoff distances. Grout performance during placement and subsequent to placement often required unique design. For example, grout placed in fuel basin structures to serve as interim stabilization materials required sufficient bearing i.e., unconfined compressive

  13. 7 CFR 51.57 - Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Facilities. 51.57 Section 51.57 Agriculture... Requirements for Plants Operating Under Continuous Inspection on A Contract Basis § 51.57 Facilities. Each packing plant shall be equipped with adequate sanitary facilities and accommodations, including but not...

  14. Preschool Comes to School: Design Concerns of Preschool Facilities.

    ERIC Educational Resources Information Center

    Passantino, Richard J.

    1994-01-01

    Addresses design and safety issues of which school business administrators should be aware when they become involved in integrating a preschool facility with an elementary school. Discusses building environmental factors, safety, health codes, play surfaces, energy conservation, and architectural considerations. (KDP)

  15. 40 CFR 60.290 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Glass Manufacturing Plants § 60.290 Applicability and designation of affected facility. (a...

  16. 40 CFR 60.80 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Sulfuric Acid Plants § 60.80 Applicability and designation of affected facility. (a) The...

  17. 40 CFR 60.80 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Sulfuric Acid Plants § 60.80 Applicability and designation of affected facility. (a) The...

  18. Hynol Process Engineering: Process Configuration, Site Plan, and Equipment Design

    DTIC Science & Technology

    1996-02-01

    feed stock. Compared with other methanol production processes, direct emissions of carbon dioxide can be substantially reduced by using the Hynol...A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the ...Hynol process. The plant is being designed to convert 50 lb./hr of biomass to methanol. The biomass consists of wood, and natural gas is used as a co

  19. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Commander Eileen Collins looks over flight equipment in the Orbiter Processing Facility, along with Glenda Laws, EVA Task Leader, with United Space Alliance at Johnson Space Center. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

    NASA Image and Video Library

    2003-10-30

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Commander Eileen Collins looks over flight equipment in the Orbiter Processing Facility, along with Glenda Laws, EVA Task Leader, with United Space Alliance at Johnson Space Center. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

  20. 40 CFR 60.70 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Nitric Acid Plants § 60.70 Applicability and designation of affected facility. (a) The provisions...