Sample records for facility operations quarterly

  1. Atmospheric Radiation Measurement program climate research facility operations quarterly report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.; Decision and Information Sciences

    2006-09-06

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.60 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.40 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.80 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the

  2. Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2010-10-26

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current yearmore » and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  3. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is

  4. Atmospheric Radiation Measurement program climate research facility operations quarterly report April 1 - June 30, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-07-26

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of

  5. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2011-02-01

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the currentmore » year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather

  6. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-04-23

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  7. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - Sep. 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-10-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 ? 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 ? 2,208) and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 ? 2,208). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive result from downtime (scheduled or unplanned) of the individual instruments

  8. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report July 1 – September 30, 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, DL

    2008-09-30

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 – (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY 2008 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data

  9. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-03-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period October 1 through December 31, 2006, for the fixed and mobile sites. Although the AMF is currently up and running in Niamey, Niger, Africa, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. The first quarter comprises a total of 2,208 hours. For all fixed sites, the actual data availability (and therefore actual hours of operation) exceeded the individual (and well as aggregate average of the fixed sites) operational goal for the first quarter of fiscal year (FY) 2007. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. NIM represents the AMF statistics for the current deployment in Niamey, Niger, Africa. PYE represents the AMF statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be

  10. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwatermore » [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.« less

  11. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-01-24

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in

  12. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-05-22

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the

  13. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. L. Sisterson

    2010-01-12

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly

  14. ROYAL PALMLINED WALK TO FACILITY 1041 (QUARTERS J) WITH FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ROYAL PALM-LINED WALK TO FACILITY 1041 (QUARTERS J) WITH FACILITY 1040 (QUARTERS 1) TO LEFT. TAKEN AT CORNER OF HALE ALII AVENUE AND EIGHTH STREET. VIEW FACING EAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Hale Alii Avenue, Eighth Street, & Avenue D, Pearl City, Honolulu County, HI

  15. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-10-08

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers

  16. Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-07-14

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore

  17. Crew Quarters Modifications

    NASA Image and Video Library

    2018-03-30

    Modifications and upgrades are underway inside the Astronaut Crew Quarters in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The crew quarters are being prepared for the next generation of space explorers. The historic facility housed Apollo and space shuttle astronauts before and after their missions into space.

  18. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less

  19. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  20. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  1. Astronaut Charles Conrad poses in shower facility in crew quarters

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Astronaut Charles Conrad Jr., Skylab 2 commander, smiles for the camera after a hot bath in the shower facility in the crew quarters of the Orbital Workshop of the Skylab 2 space station cluster in Earth orbit. In deploying the shower facility the shower curtain is pulled up from the floor and attached to the ceiling. The water comes through a push-button shower head attached to a flexible hose. Water is drawn off by a vacuum system.

  2. Crew Quarters (CQ) and Electromagnetic Interference (EMI) Measurement Facility Combined Impedance Study

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    This report documents an investigation into observed failures associated with conducted susceptibility testing of Crew Quarters (CQ) hardware in the Johnson Space Center (JSC) Electromagnetic Interference (EMI) Measurement Facility, and the work accomplished to identify the source of the observed behavior. Investigation led to the conclusion that the hardware power input impedance was interacting with the facility power impedance leading to instability at the observed frequencies of susceptibility. Testing performed in other facilities did not show this same behavior, pointing back to the EMI Measurement Facility power as the potential root cause. A LISN emulating the Station power bus impedance was inserted into the power circuit, and the susceptibility was eliminated from the measurements.

  3. Quarterly environmental data summary for first quarter 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent completemore » sets of quarterly data.« less

  4. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995more » commitments.« less

  5. Environmental Restoration (ER) Consolidated Quarterly Report_April to June 2017_ October 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John R.

    2017-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the April, May, and June 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwatermore » [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III.« less

  6. Designing Facilities for Collaborative Operations

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana

    2003-01-01

    A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized

  7. 77 FR 6007 - Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ...] Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation... they could be published in the Federal Register. This notice lists temporary safety zones, security zones, special local regulations, drawbridge operation regulations and regulated navigation areas, all...

  8. Mars mission science operations facilities design

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey S.; Wales, Roxana; Powell, Mark W.; Backes, Paul G.; Steinke, Robert C.

    2002-01-01

    A variety of designs for Mars rover and lander science operations centers are discussed in this paper, beginning with a brief description of the Pathfinder science operations facility and its strengths and limitations. Particular attention is then paid to lessons learned in the design and use of operations facilities for a series of mission-like field tests of the FIDO prototype Mars rover. These lessons are then applied to a proposed science operations facilities design for the 2003 Mars Exploration Rover (MER) mission. Issues discussed include equipment selection, facilities layout, collaborative interfaces, scalability, and dual-purpose environments. The paper concludes with a discussion of advanced concepts for future mission operations centers, including collaborative immersive interfaces and distributed operations. This paper's intended audience includes operations facility and situation room designers and the users of these environments.

  9. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  10. GIS based location optimization for mobile produced water treatment facilities in shale gas operations

    NASA Astrophysics Data System (ADS)

    Kitwadkar, Amol Hanmant

    Over 60% of the nation's total energy is supplied by oil and natural gas together and this demand for energy will continue to grow in the future (Radler et al. 2012). The growing demand is pushing the exploration and exploitation of onshore oil and natural gas reservoirs. Hydraulic fracturing has proven to not only create jobs and achieve economic growth, but also has proven to exert a lot of stress on natural resources---such as water. As water is one of the most important factors in the world of hydraulic fracturing, proper fluids management during the development of a field of operation is perhaps the key element to address a lot of these issues. Almost 30% of the water used during hydraulic fracturing comes out of the well in the form of flowback water during the first month after the well is fractured (Bai et. al. 2012). Handling this large amount of water coming out of the newly fractured wells is one of the major issues as the volume of the water after this period drops off and remains constant for a long time (Bai et. al. 2012) and permanent facilities can be constructed to take care of the water over a longer period. This paper illustrates development of a GIS based tool for optimizing the location of a mobile produced water treatment facility while development is still occurring. A methodology was developed based on a multi criteria decision analysis (MCDA) to optimize the location of the mobile treatment facilities. The criteria for MCDA include well density, ease of access (from roads considering truck hauls) and piping minimization if piping is used and water volume produced. The area of study is 72 square miles east of Greeley, CO in the Wattenberg Field in northeastern Colorado that will be developed for oil and gas production starting in the year 2014. A quarterly analysis is done so that we can observe the effect of future development plans and current circumstances on the location as we move from quarter to quarter. This will help the operators to

  11. Idaho National Laboratory Quarterly Occurrence Analysis 4th Quarter FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System, as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 84 reportable events (29 from the 4th quarter fiscal year 2016 and 55 from the prior three reporting quarters), as well as 39 other issue reports (including events found to be not reportable and Significant Category A and Bmore » conditions) identified at INL during the past 12 months (two from this quarter and 37 from the prior three quarters).« less

  12. Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending December 31, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cash, R.J.; Dukelow, G.T.; Forbes, C.J.

    1993-03-01

    This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285{degrees}C (545{degrees}F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities thatmore » were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed.« less

  13. EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.

    2010-04-20

    The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

  14. Idaho National Laboratory Quarterly Occurrence Analysis - 3rd Quarter FY-2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 73 reportable events (23 from the 3rd Qtr FY-16 and 50 from the prior three reporting quarters), as well as 45 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (16 from this quarter and 29 from the prior three quarters).« less

  15. Idaho National Laboratory Quarterly Occurrence Analysis - 1st Quarter FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 74 reportable events (16 from the 1st Qtr FY-16 and 58 from the prior three reporting quarters), as well as 35 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (15 from this quarter and 20 from the prior three quarters).« less

  16. Quarterly environmental data summary for first quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored inmore » the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate

  17. 76 FR 70342 - Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ...] Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation... published in the Federal Register. This notice lists temporary safety zones, security zones, special local..., telephone (202) 372-3862. For questions on viewing, or on submitting material to the docket, contact Ms...

  18. Idaho National Laboratory Quarterly Occurrence Analysis for the 1st Quarter FY2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 82 reportable events (13 from the 1st quarter (Qtr) of fiscal year (FY) 2017 and 68 from the prior three reporting quarters), as well as 31 other issue reports (including events found to be not reportable and Significantmore » Category A and B conditions) identified at INL during the past 12 months (seven from this quarter and 24 from the prior three quarters).« less

  19. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  20. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  1. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  2. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly...

  3. 10 CFR 34.29 - Quarterly inventory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly physical inventory to account for all sealed sources and for devices containing depleted uranium received... 10 Energy 1 2010-01-01 2010-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR...

  4. Simultaneous quarter-wave plate and half-mirror operation through a highly flexible single layer anisotropic metasurface.

    PubMed

    Khan, M Ismail; Tahir, Farooq A

    2017-11-22

    A highly flexible single-layer metasurface manifesting quarter-wave plate as well as half-mirror (1:1 beam-splitter) operation in the microwave frequency regime is being presented in this research. The designed metasurface reflects half power of the impinging linearly polarized electromagnetic wave as circularly polarized wave while the remaining half power is transmitted as circularly polarized wave at resonance frequency. Similarly, a circularly polarized incident wave is reflected and transmitted as linearly polarized wave with equal half powers. Moreover, the response of the metasurface is quite stable against the variations in the incidence angle up to 45°. The measurements performed on the fabricated prototype exhibit a good agreement with the simulation results. The compact size, flexible structure, angular stability and two in one operation (operating as a quarter-wave plate and beam-splitter at the same time) are the main characteristics of the subject metasurface that makes it a potential candidate for numerous applications in communication and miniaturized and conformal polarization control devices.

  5. Facility design, construction, and operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less

  6. Defense Attache Saigon: RNAVF Quarterly Assessment. 2nd Quarter FY74.

    DTIC Science & Technology

    1974-02-01

    Military Assistance Command Vietnam MAP Military Assistance Program UNCLASSIFIED F IUNCLASSIFIES MASI Military Assistance Service Funded MATT Military Air...8217 operating the school. The average yearly budget is 2,~4oo,000 piasters, whiuh averages out to less than five cents per student per day. This is... average daily cargo handling rate of 959 M/T for the 2nd quarter FY711 shows continued improvement over the 773 M/T rate attained during the 1st quarter

  7. Idaho National Laboratory Quarterly Performance Analysis - 2nd Quarter FY2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisbeth A. Mitchell

    2014-06-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of occurrence reports and other deficiency reports (including not reportable events) identified at INL from January 2014 through March 2014.

  8. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  9. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a) Each licensee shall maintain records of the quarterly inventory of sealed sources and of devices... 10 Energy 1 2010-01-01 2010-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy...

  10. Idaho National Laboratory Quarterly Performance Analysis for the 2nd Quarter FY 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth A.

    2015-04-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of events for the 2nd Qtr FY-15.

  11. Idaho National Laboratory Quarterly Event Performance Analysis FY 2013 4th Quarter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth A.

    2013-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Performance Assurance Organization. The Department of Energy Occurrence Reporting and Processing System (ORPS) as prescribed in DOE Order 232.2 “Occurrence Reporting and Processing of Operations Information” requires a quarterly analysis of events, both reportable and not reportable for the previous twelve months. This report is the analysis of occurrence reports and deficiency reports (including not reportable events) identified at the Idaho National Laboratory (INL) during the period of October 2012 through September 2013.

  12. Idaho National Laboratory Quarterly Occurrence Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth Ann

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 85 reportable events (18 from the 4th Qtr FY-15 and 67 from the prior three reporting quarters), as well as 25 other issue reports (including events found to be not reportable and Significant Category A and B conditions)more » identified at INL during the past 12 months (8 from this quarter and 17 from the prior three quarters).« less

  13. Idaho National Laboratory Quarterly Performance Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Lisbeth

    2014-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 60 reportable events (23 from the 4th Qtr FY14 and 37 from the prior three reporting quarters) as well as 58 other issue reports (including not reportable events and Significant Category A and B conditions) identified at INLmore » from July 2013 through October 2014. Battelle Energy Alliance (BEA) operates the INL under contract DE AC07 051D14517.« less

  14. "Library Quarterly" Management Literature, 1931-2004

    ERIC Educational Resources Information Center

    Young, Arthur P.

    2006-01-01

    Management literature appearing in "Library Quarterly," 1931-2004, is examined in this essay. A total of 145 articles are identified that focus on administrative and managerial issues related to libraries during this period. Management literature is construed expansively and includes accounting, administration, assessment, budgets, facilities,…

  15. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

  16. FACILITY 316. EXTERIOR OBLIQUE OF FRONT AS SEEN FROM FACILITY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 316. EXTERIOR OBLIQUE OF FRONT AS SEEN FROM FACILITY 362. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  17. The NASA Lewis Research Center Water Tunnel Facility

    NASA Technical Reports Server (NTRS)

    Wasserbauer, Charles A.

    1997-01-01

    A water tunnel facility specifically designed to investigate internal fluid duct flows has been built at the NASA Research Center. It is built in a modular fashion so that a variety of internal flow test hardware can be installed in the facility with minimal facility reconfiguration. The facility and test hardware interfaces are discussed along with design constraints for future test hardware. The inlet chamber flow conditioning approach is also detailed. Instrumentation and data acquisition capabilities are discussed. The incoming flow quality has been documented for about one quarter of the current facility operating range. At that range, there is some scatter in the data in the turbulent boundary layer which approaches 10 percent of the duct radius leading to a uniform core.

  18. Surface Development and Test Facility (SDTF) New R&D Simulator for Airport Operations

    NASA Technical Reports Server (NTRS)

    Dorighi, Nancy S.

    1997-01-01

    A new simulator, the Surface Development and Test Facility (SDTF) is under construction at the NASA Ames Research Center in Mountain View, California. Jointly funded by the FAA (Federal Aviation Administration) and NASA, the SDTF will be a testbed for airport surface automation technologies of the future. The SDTF will be operational in the third quarter of 1998. The SDTF will combine a virtual tower with simulated ground operations to allow evaluation of new technologies for safety, effectiveness, reliability, and cost benefit. The full-scale level V tower will provide a seamless 360 degree high resolution out-the-window view, and a full complement of ATC (air traffic control) controller positions. The imaging system will be generated by two fully-configured Silicon Graphics Onyx Infinite Reality computers, and will support surface movement of up to 200 aircraft and ground vehicles. The controller positions, displays and consoles can be completely reconfigured to match the unique layout of any individual airport tower. Dedicated areas will accommodate pseudo-airport ramp controllers, pseudo-airport operators, and pseudo-pilots. Up to 33 total personnel positions will be able to participate in simultaneous operational scenarios. A realistic voice communication infrastructure will emulate the intercom and telephone communications of a real airport tower. Multi-channel audio and video recording and a sophisticated data acquisition system will support a wide variety of research and development areas, such as evaluation of automation tools for surface operations, human factors studies, integration of terminal area and airport technologies, and studies of potential airport physical and procedural modifications.

  19. FACILITY 317. EXTERIOR OF FRONT SIDE, WITH FACILITY 316 BEYOND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 317. EXTERIOR OF FRONT SIDE, WITH FACILITY 316 BEYOND ON THE LEFT. VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  20. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  1. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  2. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  3. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  4. 10 CFR 34.69 - Records of quarterly inventory.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Records of quarterly inventory. 34.69 Section 34.69 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.69 Records of quarterly inventory. (a...

  5. Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Drury, Douglas D.

    1978-01-01

    Presents the 1978 literature review of wastewater treatment: (1) operators, training, and certification; (2) solutions to operating problems; (3) collection systems; (4) operations manuals; (5) wastewater treatment facility case histories; (5) land application; and (6) treatment of industrial wastes. A list of 36 references is also presented. (HM)

  6. Gemini base facility operations environmental monitoring: key systems and tools for the remote operator

    NASA Astrophysics Data System (ADS)

    Cordova, Martin; Serio, Andrew; Meza, Francisco; Arriagada, Gustavo; Swett, Hector; Ball, Jesse; Collins, Paul; Masuda, Neal; Fuentes, Javier

    2016-07-01

    In 2014 Gemini Observatory started the base facility operations (BFO) project. The project's goal was to provide the ability to operate the two Gemini telescopes from their base facilities (respectively Hilo, HI at Gemini North, and La Serena, Chile at Gemini South). BFO was identified as a key project for Gemini's transition program, as it created an opportunity to reduce operational costs. In November 2015, the Gemini North telescope started operating from the base facility in Hilo, Hawaii. In order to provide the remote operator the tools to work from the base, many of the activities that were normally performed by the night staff at the summit were replaced with new systems and tools. This paper describes some of the key systems and tools implemented for environmental monitoring, and the design used in the implementation at the Gemini North telescope.

  7. Spent nuclear fuel project cold vacuum drying facility operations manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IRWIN, J.J.

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less

  8. Team processes in airway facilities operations control centers.

    DOT National Transportation Integrated Search

    2000-07-01

    In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...

  9. U.S. Department of Energy Nevada Operations Office Environmental Monitoring Program summary data report, second calendar quarter 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Townsend, Y.E.

    1997-02-01

    The Nevada Test Site (NTS), located in southern Nevada, has been the primary location for testing of nuclear explosives in the continental US. Testing began in 1951 and continued until the moratorium in 1992. Waste storage and disposal facilities for defense radioactive and mixed waste are located in Areas 3 and 5. At the Area 5 Radioactive Waste Management Site (RWMS-5), low-level wastes (LLW) from US Department of Energy (DOE) affiliated onsite and offsite generators are disposed of using standard shallow land disposal techniques. Transuranic wastes are retrievably stored at the RWMS-5 in containers on a surface pad, pending shipmentmore » to the Waste Isolation Pilot Plant facility in New Mexico. Nonradioactive hazardous wastes are accumulated at a special site before shipment to a licensed offsite disposal facility. Non-standard packages of LLW are buried in subsidence craters in the Area 3 RWMS. This report describes these activities on and around the NTS and includes a listing of the results obtained from environmental surveillance activities during the second calendar quarter of 1996.« less

  10. Computational modeling and experimental studies on NO{sub x} reduction under pulverized coal combustion conditions. Seventh quarterly technical progress report, July 1, 1996--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kumpaty, S.K.; Subramanian, K.; Nokku, V.P.

    1996-12-31

    During this quarter (July-August 1996), the experiments for nitric oxide reburning with a combination of methane and ammonia were conducted successfully. This marked the completion of gaseous phase experiments. Preparations are underway for the reburning studies with coal. A coal feeder was designed to suit our reactor facility which is being built by MK Fabrication. The coal feeder should be operational in the coming quarter. Presented here are the experimental results of NO reburning with methane/ammonia. The results are consistent with the computational work submitted in previous reports.

  11. APPA's New Operational Guidelines for Educational Facilities

    ERIC Educational Resources Information Center

    Bigger, Alan S.

    2011-01-01

    Nearly 25 years ago a group of APPA members and facilities managers started to discuss an idea and to plant a seed about the need for a document, or series of documents, that would explain the need for staffing facilities operations and the implication of such staffing on levels of service. As the demand for increased budget cuts reached seismic…

  12. Effect of facility on the operative costs of distal radius fractures.

    PubMed

    Mather, Richard C; Wysocki, Robert W; Mack Aldridge, J; Pietrobon, Ricardo; Nunley, James A

    2011-07-01

    The purpose of this study was to investigate whether ambulatory surgery centers can deliver lower-cost care and to identify sources of those cost savings. We performed a cost identification analysis of outpatient volar plating for closed distal radius fractures at a single academic medical center. Multiple costs and time measures were taken from an internal database of 130 consecutive patients and were compared by venue of treatment, either an inpatient facility or an ambulatory, stand-alone surgery facility. The relationships between total cost and operative time and multiple variables, including fracture severity, patient age, gender, comorbidities, use of bone graft, concurrent carpal tunnel release, and surgeon experience, were examined, using multivariate analysis and regression modeling to identify other cost drivers or explanatory variables. The mean operative cost was considerably greater at the inpatient facility ($7,640) than at the outpatient facility ($5,220). Cost drivers of this difference were anesthesia services, post-anesthesia care unit, and operating room costs. Total surgical time, nursing time, set-up, and operative times were 33%, 109%, 105%, and 35% longer, respectively, at the inpatient facility. There was no significant difference between facilities for the additional variables, and none of those variables independently affected cost or operative time. The only predictor of cost and time was facility type. This study supports the use of ambulatory stand-alone surgical facilities to achieve efficient resource utilization in the operative treatment of distal radius fractures. We also identified several specific costs and time measurements that differed between facilities, which can serve as potential targets for tertiary facilities to improve utilization. Economic and Decisional Analysis III. Copyright © 2011 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.

  13. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  14. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Discontinuance of USPS-operated retail facilities... ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a... of whether an existing retail Post Office, station, or branch should be discontinued. The rules cover...

  15. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Discontinuance of USPS-operated retail facilities... ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a... of whether an existing retail Post Office, station, or branch should be discontinued. The rules cover...

  16. 39 CFR 241.3 - Discontinuance of USPS-operated retail facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Discontinuance of USPS-operated retail facilities... ESTABLISHMENT CLASSIFICATION, AND DISCONTINUANCE § 241.3 Discontinuance of USPS-operated retail facilities. (a... of whether an existing retail Post Office, station, or branch should be discontinued. The rules cover...

  17. 47 CFR 73.1615 - Operation during modification of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...

  18. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of meals provided to employees at an employer-operated eating facility for employees is excludable... dining room or cafeteria in which meals are served is treated as a separate eating facility, whether each... employer, and (iv) The meals furnished at the facility are provided during, or immediately before or after...

  19. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of meals provided to employees at an employer-operated eating facility for employees is excludable... dining room or cafeteria in which meals are served is treated as a separate eating facility, whether each... employer, and (iv) The meals furnished at the facility are provided during, or immediately before or after...

  20. Trends in antenatal care attendance and health facility delivery following community and health facility systems strengthening interventions in Northern Uganda.

    PubMed

    Ediau, Michael; Wanyenze, Rhoda K; Machingaidze, Simba; Otim, George; Olwedo, Alex; Iriso, Robert; Tumwesigye, Nazarius M

    2013-10-18

    Maternal morbidity and mortality remains high in Uganda; largely due to inadequate antenatal care (ANC), low skilled deliveries and poor quality of other maternal health services. In order to address both the demand and quality of ANC and skilled deliveries, we introduced community mobilization and health facility capacity strengthening interventions. Interventions were introduced between January 2010 and September 2011. These included: training health workers, provision of medical supplies, community mobilization using village health teams, music dance and drama groups and male partner access clubs. These activities were implemented at Kitgum Matidi health center III and its catchment area. Routinely collected health facility data on selected outcomes in the year preceding the interventions and after 21 months of implementation of the interventions was reviewed. Trend analysis was performed using excel and statistical significance testing was performed using EPINFO StatCal option. The number of pregnant women attending the first ANC visit significantly increased from 114 to 150 in the first and fourth quarter of 2010 (OR 1.72; 95% CI 1.39-2.12) and to 202 in the third quarter of 2011(OR 11.41; 95% CI 7.97-16.34). The number of pregnant women counselled, tested and given results for HIV during the first ANC attendance significantly rose from 92 (80.7%) to 146 (97.3%) in the first and fourth quarter of 2010 and then to 201 (99.5%) in the third quarter of 2011. The number of male partners counseled, tested and given results together with their wives at first ANC visit rose from 13 (16.7%) in the fourth quarter of 2009 to 130 (89%) in the fourth quarter of 2010 and to 180 (89.6%) in the third quarter of 2011. There was a significant rise in the number of pregnant women delivering in the health facility with provision of mama-kits (delivery kits), from 74 (55.2%) to 149 (99.3%) in the second and fourth quarter of 2010. Combined community and facility systems

  1. Lunar launch and landing facilities and operations

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Florida Institute of Technology established an Interdisciplinary Design Team to design a lunar based facility whose primary function involves launch and landing operations for future moon missions. Both manned and unmanned flight operations were considered in the study with particular design emphasis on the utilization (or reutilization) of all materials available on the moon. This resource availability includes man-made materials which might arrive in the form of expendable landing vehicles as well as in situ lunar minerals. From an engineering standpoint, all such materials are considered as to their suitability for constructing new lunar facilities and/or repairing or expanding existing structures. Also considered in this design study was a determination of the feasibility of using naturally occurring lunar materials to provide fuel components to support lunar launch operations. Conventional launch and landing operations similar to those used during the Apollo Program were investigated as well as less conventional techniques such as rail guns and electromagnetic mass drivers. The Advanced Space Design team consisted of students majoring in Physics and Space Science as well as Electrical, Mechanical, Chemical and Ocean Engineering.

  2. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of inmore » the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.« less

  3. 4. Northeast corner of quarters (executive officer's quarters), looking onto ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Northeast corner of quarters (executive officer's quarters), looking onto Quarter R (commanding officer's quarters), looking southeast - Naval Air Station Chase Field, Texas State Highway 202, 4.8 miles east of intersection of Texas State Highway 202 & U.S. State Highway 181, Beeville, Bee County, TX

  4. 42 CFR 136.110 - Facilities construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Facilities construction. 136.110 Section 136.110... Facilities and Services § 136.110 Facilities construction. In addition to other requirements of this subpart..., clinic, health station or quarters for housing personnel associated with such facilities, must in its...

  5. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  6. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  7. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  8. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  9. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  10. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  11. Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-10

    NASA Technical Reports Server (NTRS)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2010-01-01

    Three AMU tasks were completed in this Quarter, each resulting in a forecast tool now being used in operations and a final report documenting how the work was done. AMU personnel completed the following tasks (1) Phase II of the Peak Wind Tool for General Forecasting task by delivering an improved wind forecasting tool to operations and providing training on its use; (2) a graphical user interface (GUI) she updated with new scripts to complete the ADAS Update and Maintainability task, and delivered the scripts to the Spaceflight Meteorology Group on Johnson Space Center, Texas and National Weather Service in Melbourne, Fla.; and (3) the Verify MesoNAM Performance task after we created and delivered a GUI that forecasters will use to determine the performance of the operational MesoNAM weather model forecast.

  12. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  13. 1. North side of quarters (executive officer's quarters), looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. North side of quarters (executive officer's quarters), looking southeast - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  14. 5. East side of quarters (executive officer's quarters), looking west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. East side of quarters (executive officer's quarters), looking west - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  15. 2. West side of quarters (executive officer's quarters), looking east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. West side of quarters (executive officer's quarters), looking east - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  16. 4. South side of quarters (executive officer's quarters), looking north ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. South side of quarters (executive officer's quarters), looking north - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  17. 3. Southwest side of quarters (executive officer's quarters), looking northeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southwest side of quarters (executive officer's quarters), looking northeast - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  18. A study of the operation of selected national research facilities

    NASA Technical Reports Server (NTRS)

    Eisner, M.

    1974-01-01

    The operation of national research facilities was studied. Conclusions of the study show that a strong resident scientific staff is required for successful facility operation. No unique scheme of scientific management is revealed except for the obvious fact that the management must be responsive to the users needs and requirements. Users groups provide a convenient channel through which these needs and requirements are communicated.

  19. 3. Southwest side of quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Southwest side of quarters R (commanding officer's quarters), looking east - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  20. 6. Interior of quarters (executive officer's quarters), living room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Interior of quarters (executive officer's quarters), living room, looking west - Naval Air Station Chase Field, Quarters S, Essex Street, .45 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  1. 1. Northeast side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Northeast side of Quarters R (commanding officer's quarters), looking west - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  2. 2. Southeast side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Southeast side of Quarters R (commanding officer's quarters), looking northwest - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  3. 4. Northwest side of Quarters R (commanding officer's quarters), looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Northwest side of Quarters R (commanding officer's quarters), looking southeast - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  4. 5. Interior of Quarters R (commanding officer's quarters), living room, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Interior of Quarters R (commanding officer's quarters), living room, looking northwest - Naval Air Station Chase Field, Quarters R, Essex Street, .43 mile South-Southeast of intersection of Texas State Highway 202 & Independence Street, Beeville, Bee County, TX

  5. Particulate Hot Gas Stream Cleanup Technical Issues: Quarterly report, July 1-September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pontius, D.H.

    1996-12-09

    This is the eighth in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic barrier filter elements. Task 1 is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis ofmore » ceramic filter elements. Under Task I during the past quarter, additional analyses were performed on ashes from the Ahlstrom 10 MWt Pressurized Fluidized Circulating Fluid Bed (PCFB) facility located at Karhula, Finland. Work continued on the HGCU data base being constructed in Microsoft Access. A variety of information has been entered into the data base, including numerical values, short or long text entries, and photographs. Detailed design of a bench top device for high temperature measurement of ash permeability has also begun. In addition to these activities, a paper was prepared and a poster was presented summarizing recent work performed under this contract at the 1996 DOE/METC Contractor`s Conference. A presentation was also given corresponding to the manuscript entitled Particle Characteristics and High-Temperature Filtration that was prepared for publication in the Proceedings of the Thirteenth Annual International Pittsburgh Coal Conference held this September in Pittsburgh, PA. Arrangements have been made to be present at the DOE/METC Modular Gas Cleanup Rig (MGCR) at the conclusion of the next run of the DOE/METC air blown Fluid Bed Gasifier (FBG). This visit will include on-site sampling to collect and characterize the filter cakes collected during FGB operation. Task 2 efforts during the past quarter

  6. Residential Group Care Quarterly. Volume 5, Number 1, Summer 2004

    ERIC Educational Resources Information Center

    Kirkwood, Scott, Ed.

    2004-01-01

    This issue of "Residential Group Care Quarterly" contains the following articles: (1) "National Definitions and Data Collection for Residential Care Facilities' Use of Restraint and Seclusion" (Lloyd Bullard); (2) "CWLA Publishes Best Practices in Behavior Support and Intervention Assessment Instrument" (Nupur Gupta); (3) "Initial Findings of an…

  7. Panorama, section 2 of 3, note the Operations Building (Facility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Panorama, section 2 of 3, note the Operations Building (Facility 294) in the center of facility, view facing west - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  8. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information. Contents include the following: RTO Technical Publications: A Quarterly Listing. Implications of Multilingual Interoperability of Speech Technology for Military Use. Non-Lethal Weapons and Future Peace Enforcement Operations.

  9. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinookmore » and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.« less

  10. Post-Secondary Institutions Facilities Inventory Operating Manual.

    ERIC Educational Resources Information Center

    British Columbia Dept. of Education, Victoria.

    This manual presents the operations of British Columbia's computerized facilities inventory for post-secondary institutions. A brief summary describes the kinds of code tables used, the forms used to feed data into the computer, the types of printout reports available, and the responsibilities of institutions using the system. More detailed…

  11. Description and Operation of the A3 Subscale Facility

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Varner, D. G.; Grover, J. B.

    2010-01-01

    The purpose of this paper is to give an overview of the general design and operation of the A3 Subscale test facility. The goal is to provide the reader with a general understanding of what the major facility systems are, where they are located, and how they are used to meet the objectives supporting the design of the A3 altitude rocket test facility. This paper also provides the reader with the background information prior to reading the subsequent papers detailing the design and test results of the various systems described herein.

  12. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  13. Results For The Third Quarter Calendar Year 2016 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2016-10-13

    In this memorandum, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2016 (CY16) sample of Tank 50H salt solution are presented in tabulated form. The Third Quarter CY16 Tank 50H samples (a 200 mL sample obtained 6” below the surface (HTF-5-16-63) and a 1 L sample obtained 66” from the tank bottom (HTF-50-16-64)) were obtained on July 14, 2016 and received at Savannah River National Laboratory (SRNL) on the same day. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours, and the samples were pulled immediately after pumpmore » shut down. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY16 sampling of Tank 50H were requested by Savannah River Remediation (SRR) personnel and details of the testing are presented in the SRNL TTQAP.« less

  14. 75 FR 70708 - Palisades Nuclear Plant; Notice of Consideration of Issuance of Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant... (NRC, the Commission) is considering issuance of an amendment to Facility Operating License No. DPR-20... PNP Renewed Facility Operating License. The change would remove the name of the former operator of the...

  15. Expanded operational capabilities of the Langley Mach 7 Scramjet test facility

    NASA Technical Reports Server (NTRS)

    Thomas, S. R.; Guy, R. W.

    1983-01-01

    An experimental research program conducted to expand the operational capabilities of the NASA Langley Mach 7 Scramjet Test Facility is described. Previous scramjet testing in this facility was limited to a single simulated flight condition of Mach 6.9 at an altitude of 115,300 ft. The arc heater research demonstrates the potential of the facility for scramjet testing at simulated flight conditions from Mach 4 (at altitudes from 77,000 to 114,000 ft) to Mach 7 (at latitudes from 108,000 to 149,000 ft). Arc heater electrical characteristics, operational problems, measurements of nitrogen oxide contaminants, and total-temperature profiles are discussed.

  16. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  17. Operators in the Plum Brook Reactor Facility Control Room

    NASA Image and Video Library

    1970-03-21

    Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

  18. Implementation of patient charges at primary care facilities in Kenya: implications of low adherence to user fee policy for users and facility revenue

    PubMed Central

    Opwora, Antony; Waweru, Evelyn; Toda, Mitsuru; Noor, Abdisalan; Edwards, Tansy; Fegan, Greg; Molyneux, Sassy; Goodman, Catherine

    2015-01-01

    With user fees now seen as a major hindrance to universal health coverage, many countries have introduced fee reduction or elimination policies, but there is growing evidence that adherence to reduced fees is often highly imperfect. In 2004, Kenya adopted a reduced and uniform user fee policy providing fee exemptions to many groups. We present data on user fee implementation, revenue and expenditure from a nationally representative survey of Kenyan primary health facilities. Data were collected from 248 randomly selected public health centres and dispensaries in 2010, comprising an interview with the health worker in charge, exit interviews with curative outpatients, and a financial record review. Adherence to user fee policy was assessed for eight tracer conditions based on health worker reports, and patients were asked about actual amounts paid. No facilities adhered fully to the user fee policy across all eight tracers, with adherence ranging from 62.2% for an adult with tuberculosis to 4.2% for an adult with malaria. Three quarters of exit interviewees had paid some fees, with a median payment of US dollars (USD) 0.39, and a quarter of interviewees were required to purchase additional medical supplies at a later stage from a private drug retailer. No consistent pattern of association was identified between facility characteristics and policy adherence. User fee revenues accounted for almost all facility cash income, with average revenue of USD 683 per facility per year. Fee revenue was mainly used to cover support staff, non-drug supplies and travel allowances. Adherence to user fee policy was very low, leading to concerns about the impact on access and the financial burden on households. However, the potential to ensure adherence was constrained by the facilities’ need for revenue to cover basic operating costs, highlighting the need for alternative funding strategies for peripheral health facilities. PMID:24837638

  19. 77 FR 14441 - Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-348 AND 50-364; NRC-2012-0053] Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley Nuclear Plant, Units 1 and 2...-0053. You may submit comments by the following methods: Federal Rulemaking Web site: Go to http://www...

  20. 45 CFR 303.108 - Quarterly wage and unemployment compensation claims reporting to the National Directory of New...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Quarterly wage and unemployment compensation... OPERATIONS § 303.108 Quarterly wage and unemployment compensation claims reporting to the National Directory of New Hires. (a) What definitions apply to quarterly wage and unemployment compensation claims...

  1. 45 CFR 303.108 - Quarterly wage and unemployment compensation claims reporting to the National Directory of New...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 2 2012-10-01 2012-10-01 false Quarterly wage and unemployment compensation... OPERATIONS § 303.108 Quarterly wage and unemployment compensation claims reporting to the National Directory of New Hires. (a) What definitions apply to quarterly wage and unemployment compensation claims...

  2. 45 CFR 303.108 - Quarterly wage and unemployment compensation claims reporting to the National Directory of New...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 2 2011-10-01 2011-10-01 false Quarterly wage and unemployment compensation... OPERATIONS § 303.108 Quarterly wage and unemployment compensation claims reporting to the National Directory of New Hires. (a) What definitions apply to quarterly wage and unemployment compensation claims...

  3. Conference room 211, adjacent to commander's quarters, with vault door ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Conference room 211, adjacent to commander's quarters, with vault door at right. Projection area at center is equipped with automatic security drapes. Projection room uses a 45 degree mirror to reflect the image onto the frosted glass screen. Door on far left leads to display area senior battle staff viewing bridge, and the commander's quarters - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  4. Man-vehicle systems research facility: Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Man-Vehicle Systems Research Facility (MVSRF) provides the capability of simulating aircraft (two with full crews), en route and terminal air traffic control and aircrew interactions, and advanced cockpit (1995) display representative of future generations of aircraft, all within the full mission context. The characteristics of this facility derive from research, addressing critical human factors issues that pertain to: (1) information requirements for the utilization and integration of advanced electronic display systems, (2) the interaction and distribution of responsibilities between aircrews and ground controllers, and (3) the automation of aircrew functions. This research has emphasized the need for high fidelity in simulations and for the capability to conduct full mission simulations of relevant aircraft operations. This report briefly describes the MVSRF design and operating characteristics.

  5. Man-Vehicle Systems Research Facility - Design and operating characteristics

    NASA Technical Reports Server (NTRS)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  6. 45 CFR 303.108 - Quarterly wage and unemployment compensation claims reporting to the National Directory of New...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true Quarterly wage and unemployment compensation claims... OPERATIONS § 303.108 Quarterly wage and unemployment compensation claims reporting to the National Directory of New Hires. (a) What definitions apply to quarterly wage and unemployment compensation claims...

  7. 45 CFR 303.108 - Quarterly wage and unemployment compensation claims reporting to the National Directory of New...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 2 2014-10-01 2012-10-01 true Quarterly wage and unemployment compensation claims... OPERATIONS § 303.108 Quarterly wage and unemployment compensation claims reporting to the National Directory of New Hires. (a) What definitions apply to quarterly wage and unemployment compensation claims...

  8. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  9. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  10. Recent Enhancements to the National Transonic Facility (Mixed Mode Operations)

    NASA Technical Reports Server (NTRS)

    Kilgore, W. Allen; Chan, David; Balakrishna, S.; Wahls, Richard A.

    2006-01-01

    The U.S. National Transonic Facility continues to make enhancements to provide quality data in a safe, efficient and cost effective method for aerodynamic ground testing. Recent enhancements discussed in this paper include the development of a Mixed-mode of operations that combine Air-mode operations with Nitrogen-mode operations. This implementation and operational results of this new Mixed-mode expands the ambient temperature transonic region of testing beyond the Air-mode limitations at a significantly reduced cost over Nitrogen Mode operation.

  11. Some Operating Experience and Problems Encountered During Operation of a Free-jet Facility

    NASA Technical Reports Server (NTRS)

    Mcaulay, John E; Prince, William R

    1957-01-01

    During a free-jet investigation of a 28-inch ram-jet engine at a Mach number of 2.35, flow pulsation at the engine inlet were discovered which proved to have an effect on the engine performance and operational characteristics, particularly the engine rich blowout limits. This report discusses the finding of the flow pulsations, their elimination, and effect. Other facility characteristics, such as the establishment of flow simulation and the degree of subcritical operation of the diffuser, are also explained.

  12. Space Infrared Telescope Facility (SIRTF) - Operations concept. [decreasing development and operations cost

    NASA Technical Reports Server (NTRS)

    Miller, Richard B.

    1992-01-01

    The development and operations costs of the Space IR Telescope Facility (SIRTF) are discussed in the light of minimizing total outlays and optimizing efficiency. The development phase cannot extend into the post-launch segment which is planned to only support system verification and calibration followed by operations with a 70-percent efficiency goal. The importance of reducing the ground-support staff is demonstrated, and the value of the highly sensitive observations to the general astronomical community is described. The Failure Protection Algorithm for the SIRTF is designed for the 5-yr lifetime and the continuous venting of cryogen, and a science driven ground/operations system is described. Attention is given to balancing cost and performance, prototyping during the development phase, incremental development, the utilization of standards, and the integration of ground system/operations with flight system integration and test.

  13. University of Washington Clinical Neutron Facility: Report on 26 Years of Operation

    NASA Astrophysics Data System (ADS)

    Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi

    2011-12-01

    Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

  14. TRAC analyses for CCTF and SCTF tests and UPTF design/operation. [Cylindrical Core Test Facility; Slab Core Test Facility; Upper Plenum Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spore, J.W.; Cappiello, M.W.; Dotson, P.J.

    The analytical support in 1985 for Cylindrical Core Test Facility (CCTF), Slab Core Test Facility (SCTF), and Upper Plenum Test Facility (UPTF) tests involves the posttest analysis of 16 tests that have already been run in the CCTF and the SCTF and the pretest analysis of 3 tests to be performed in the UPTF. Posttest analysis is used to provide insight into the detailed thermal-hydraulic phenomena occurring during the refill and reflood tests performed in CCTF and SCTF. Pretest analysis is used to ensure that the test facility is operated in a manner consistent with the expected behavior of anmore » operating full-scale plant during an accident. To obtain expected behavior of a plant during an accident, two plant loss-of-coolant-accident (LOCA) calculations were performed: a 200% cold-leg-break LOCA calculation for a 2772 MW(t) Babcock and Wilcox plant and a 200% cold-leg-break LOCA calculation for a 3315 MW(t) Westinghouse plant. Detailed results are presented for several CCTF UPI tests and the Westinghouse plant analysis.« less

  15. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, March 15-16, 1979, Tampa, Florida. Third quarterly progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-04-24

    The eleventh quarterly coordination meeting of the methane production group of the Fuels From Biomass Systems Branch, US Department of Energy was held at Tampa, Florida, March 15-16, 1979. Progress reports were presented by the contractors and a site visit was made to Kaplan Industries, Bartow, Florida to see the Hamilton Standard demonstration facility for digestion of environmental feedlot residue to methane. A meeting agenda, a list of attendees, and progress reports are presented.

  16. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operatedmore » waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By

  17. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  18. Implementation of patient charges at primary care facilities in Kenya: implications of low adherence to user fee policy for users and facility revenue.

    PubMed

    Opwora, Antony; Waweru, Evelyn; Toda, Mitsuru; Noor, Abdisalan; Edwards, Tansy; Fegan, Greg; Molyneux, Sassy; Goodman, Catherine

    2015-05-01

    With user fees now seen as a major hindrance to universal health coverage, many countries have introduced fee reduction or elimination policies, but there is growing evidence that adherence to reduced fees is often highly imperfect. In 2004, Kenya adopted a reduced and uniform user fee policy providing fee exemptions to many groups. We present data on user fee implementation, revenue and expenditure from a nationally representative survey of Kenyan primary health facilities. Data were collected from 248 randomly selected public health centres and dispensaries in 2010, comprising an interview with the health worker in charge, exit interviews with curative outpatients, and a financial record review. Adherence to user fee policy was assessed for eight tracer conditions based on health worker reports, and patients were asked about actual amounts paid. No facilities adhered fully to the user fee policy across all eight tracers, with adherence ranging from 62.2% for an adult with tuberculosis to 4.2% for an adult with malaria. Three quarters of exit interviewees had paid some fees, with a median payment of US dollars (USD) 0.39, and a quarter of interviewees were required to purchase additional medical supplies at a later stage from a private drug retailer. No consistent pattern of association was identified between facility characteristics and policy adherence. User fee revenues accounted for almost all facility cash income, with average revenue of USD 683 per facility per year. Fee revenue was mainly used to cover support staff, non-drug supplies and travel allowances. Adherence to user fee policy was very low, leading to concerns about the impact on access and the financial burden on households. However, the potential to ensure adherence was constrained by the facilities' need for revenue to cover basic operating costs, highlighting the need for alternative funding strategies for peripheral health facilities. Published by Oxford University Press in association with

  19. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a) Definition... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of Facilities, Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition...

  20. Reliability Considerations for the Operation of Large Accelerator User Facilities

    DOE PAGES

    Willeke, F. J.

    2016-01-29

    The lecture provides an overview of considerations relevant for achieving highly reliable operation of accelerator based user facilities. The article starts with an overview of statistical reliability formalism which is followed by high reliability design considerations with examples. Finally, the article closes with operational aspects of high reliability such as preventive maintenance and spares inventory.

  1. 76 FR 62868 - Washington State University; Notice of Issuance of Renewed Facility Operating License No. R-76

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...

  2. The ITER Neutral Beam Test Facility towards SPIDER operation

    NASA Astrophysics Data System (ADS)

    Toigo, V.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Gambetta, G.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Piovan, R.; Recchia, M.; Rizzolo, A.; Sartori, E.; Siragusa, M.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Fröschle, M.; Heinemann, B.; Kraus, W.; Nocentini, R.; Riedl, R.; Schiesko, L.; Wimmer, C.; Wünderlich, D.; Cavenago, M.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Hemsworth, R.

    2017-08-01

    SPIDER is one of two projects of the ITER Neutral Beam Test Facility under construction in Padova, Italy, at the Consorzio RFX premises. It will have a 100 keV beam source with a full-size prototype of the radiofrequency ion source for the ITER neutral beam injector (NBI) and also, similar to the ITER diagnostic neutral beam, it is designed to operate with a pulse length of up to 3600 s, featuring an ITER-like magnetic filter field configuration (for high extraction of negative ions) and caesium oven (for high production of negative ions) layout as well as a wide set of diagnostics. These features will allow a reproduction of the ion source operation in ITER, which cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission of achieving the ITER heating and diagnostic NBI ion source requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations—integration and testing of SPIDER components, completion and implementation of diagnostics and control and formulation of operation and research plan, based on a staged strategy.

  3. Quail Egg compared to a quarter

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Quail eggs are small (shown here with a quarter for scale) and develop quickly, making them ideal for space experiments. The Avian Development Facility (ADF) supports 36 eggs in two carousels (below), one of which rotates to provide a 1-g control for comparing to eggs grown in microgravity. The ADF originated in NASA's Shuttle Student Involvement program in the 1980s and was developed under the NASA Small Business Irnovation Research program. In late 2001, the ADF made its first flight and carried eggs used in two investigations, Development and function of the inner-ear balance system in normal and altered gravity environments, and Skeletal development in embryonic quail.

  4. Kistler reusable vehicle facility design and operational approach

    NASA Astrophysics Data System (ADS)

    Fagan, D.; McInerney, F.; Johnston, C.; Tolson, B.

    Kistler Aerospace Corporation is designing and developing the K-1, the world's first fully reusable aerospace vehicle to deliver satellites into orbit. The K-1 vehicle test program will be conducted in Woomera, Australia, with commercial operations scheduled to begin shortly afterwards. Both stages of the K-1 will return to the launch site utilizing parachutes and airbags for a soft landing within 24 h after launch. The turnaround flow of the two stages will cycle from landing site to a maintenance/refurbishment facility and through the next launch in only 9 days. Payload processing will occur in a separate facility in parallel with recovery and refurbishment operations. The vehicle design and on-board checkout capability of the avionics system eliminates the need for an abundance of ground checkout equipment. Payload integration, vehicle assembly, and K-1 transport to the launch pad will be performed horizontally, simplifying processing and reducing infrastructure requirements. This simple, innovative, and cost-effective approach will allow Kistler to offer its customers flexible, low-cost, and on-demand launch services.

  5. Longitudinal variation in pressure injury incidence among long-term aged care facilities.

    PubMed

    Jorgensen, Mikaela; Siette, Joyce; Georgiou, Andrew; Westbrook, Johanna I

    2018-05-04

    To examine variation in pressure injury (PI) incidence among long-term aged care facilities and identify resident- and facility-level factors that explain this variation. Longitudinal incidence study using routinely-collected electronic care management data. A large aged care service provider in New South Wales and the Australian Capital Territory, Australia. About 6556 people aged 65 years and older who were permanent residents in 60 long-term care facilities between December 2014 and November 2016. Risk-adjusted PI incidence rates over eight study quarters. Incidence density over the study period was 1.33 pressure injuries per 1000 resident days (95% confidence interval (CI) = 1.29-1.37). Funnel plots were used to identify variation among facilities. On average, 14% of facilities had risk-adjusted PI rates that were higher than expected in each quarter (above 95% funnel plot control limits). Ten percent of facilities had persistently high rates in any three or more consecutive quarters (n = 6). The variation between facilities was only partly explained by resident characteristics in multilevel regression models. Residents were more likely to have higher-pressure injury rates in facilities in regional areas compared with major city areas (adjusted incidence rate ratio = 1.25, 95% CI = 1.04-1.51), and facilities with persistently high rates were more likely to be located in areas with low socioeconomic status (P = 0.038). There is considerable variation among facilities in PI incidence. This study demonstrates the potential of routinely-collected care management data to monitor PI incidence and to identify facilities that may benefit from targeted intervention.

  6. 75 FR 19428 - Palisades Nuclear Plant; Notice of Consideration of Issuance of Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant... (NRC or the Commission) is considering issuance of an amendment to Facility Operating License No. DPR... (SSC) or change the way any SSC is operated. The proposed license condition does not involve operation...

  7. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which...

  8. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which...

  9. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which...

  10. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which...

  11. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., soil, or surface water which could threaten human health or the -environment. ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Maintenance and operation of facility. 265.31 Section 265.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  12. Modelling and operation strategies of DLR's large scale thermocline test facility (TESIS)

    NASA Astrophysics Data System (ADS)

    Odenthal, Christian; Breidenbach, Nils; Bauer, Thomas

    2017-06-01

    In this work an overview of the TESIS:store thermocline test facility and its current construction status will be given. Based on this, the TESIS:store facility using sensible solid filler material is modelled with a fully transient model, implemented in MATLAB®. Results in terms of the impact of filler site and operation strategies will be presented. While low porosity and small particle diameters for the filler material are beneficial, operation strategy is one key element with potential for optimization. It is shown that plant operators have to ponder between utilization and exergetic efficiency. Different durations of the charging and discharging period enable further potential for optimizations.

  13. CSSEDC Quarterly. 1989.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1989-01-01

    These four issues of the CSSEDC Quarterly (Conference for Secondary School English Department Chairpersons) represent the quarterly for 1989. Articles in number 1 deal with professional development, and include: "Sharing Expertise within a Department" (Martha R. Dolly); "Empowerment Develops a Computer Writing Center" (Norman…

  14. National Ignition Facility Control and Information System Operational Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, C D; Beeler, R G; Bowers, G A

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint themore » size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.« less

  15. A knowledge acquisition process to analyse operational problems in solid waste management facilities.

    PubMed

    Dokas, Ioannis M; Panagiotakopoulos, Demetrios C

    2006-08-01

    The available expertise on managing and operating solid waste management (SWM) facilities varies among countries and among types of facilities. Few experts are willing to record their experience, while few researchers systematically investigate the chains of events that could trigger operational failures in a facility; expertise acquisition and dissemination, in SWM, is neither popular nor easy, despite the great need for it. This paper presents a knowledge acquisition process aimed at capturing, codifying and expanding reliable expertise and propagating it to non-experts. The knowledge engineer (KE), the person performing the acquisition, must identify the events (or causes) that could trigger a failure, determine whether a specific event could trigger more than one failure, and establish how various events are related among themselves and how they are linked to specific operational problems. The proposed process, which utilizes logic diagrams (fault trees) widely used in system safety and reliability analyses, was used for the analysis of 24 common landfill operational problems. The acquired knowledge led to the development of a web-based expert system (Landfill Operation Management Advisor, http://loma.civil.duth.gr), which estimates the occurrence possibility of operational problems, provides advice and suggests solutions.

  16. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  17. 40 CFR 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What types of operator certification... Certification § 60.1185 What types of operator certification must the chief facility operator and shift... combustion unit initial startup. (2) December 6, 2001. (3) Six months after they transfer to the municipal...

  18. 40 CFR 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What types of operator certification... Certification § 60.1185 What types of operator certification must the chief facility operator and shift... combustion unit initial startup. (2) December 6, 2001. (3) Six months after they transfer to the municipal...

  19. 40 CFR 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What types of operator certification... Certification § 60.1185 What types of operator certification must the chief facility operator and shift... combustion unit initial startup. (2) December 6, 2001. (3) Six months after they transfer to the municipal...

  20. 40 CFR 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What types of operator certification... Certification § 60.1185 What types of operator certification must the chief facility operator and shift... combustion unit initial startup. (2) December 6, 2001. (3) Six months after they transfer to the municipal...

  1. International Space Station USOS Crew Quarters Development

    NASA Technical Reports Server (NTRS)

    Broyan, James Lee, Jr.; Borrego, Melissa Ann; Bahr, Juergen F.

    2008-01-01

    The International Space Station (ISS) United States Operational Segment (USOS) currently provides a Temporary Sleep Station (TeSS) as crew quarters for one crewmember in the Laboratory Module. The Russian Segment provides permanent crew quarters (Kayutas) for two crewmembers in the Service Module. The TeSS provides limited electrical, communication, and ventilation functionality. A new permanent rack sized USOS ISS Crew Quarters (CQ) is being developed. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The new CQs will provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, controllable airflow, communication equipment, redundant electrical systems, and redundant caution and warning systems. The rack sized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. Providing an acoustically quiet and visually isolated environment, while ensuring crewmember safety, is critical for obtaining crewmember rest and comfort to enable long term crewmember performance. The numerous human factor, engineering, and program considerations during the concept, design, and prototyping are outlined in the paper.

  2. CSSEDC Quarterly. 1990.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1990-01-01

    These four issues of the CSSEDC Quarterly (Conference for Secondary School English Department Chairpersons) represent the quarterly for 1990. Articles in number 1 deal with student teachers and include: "Student Teaching: Smoothing Out the Rough Spots" (Susan B. Argyle and Fred C. Feitler); "A Partnership for Urban Student…

  3. Quarterly Coal Distribution

    EIA Publications

    2017-01-01

    The Quarterly Coal Distribution Report (QCDR) provides detailed U.S. domestic coal distribution data by coal origin state, coal destination state, mode of transportation, and consuming sector. Quarterly data for all years are preliminary and will be superseded by the release of the corresponding Annual Coal Distribution Report.

  4. 40 CFR 264.31 - Design and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Design and operation of facility. 264.31 Section 264.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES...-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water which...

  5. PIRATE: A Remotely Operable Telescope Facility for Research and Education

    NASA Astrophysics Data System (ADS)

    Holmes, S.; Kolb, U.; Haswell, C. A.; Burwitz, V.; Lucas, R. J.; Rodriguez, J.; Rolfe, S. M.; Rostron, J.; Barker, J.

    2011-10-01

    We introduce PIRATE, a new remotely operable telescope facility for use in research and education, constructed from off-the-shelf hardware, operated by The Open University. We focus on the PIRATE Mark 1 operational phase, in which PIRATE was equipped with a widely used 0.35 m Schmidt-Cassegrain system (now replaced with a 0.425 m corrected Dall-Kirkham astrograph). Situated at the Observatori Astronòmic de Mallorca, PIRATE is currently used to follow up potential transiting extrasolar planet candidates produced by the SuperWASP North experiment, as well as to hunt for novae in M31 and other nearby galaxies. It is operated by a mixture of commercially available software and proprietary software developed at the Open University. We discuss problems associated with performing precision time-series photometry when using a German Equatorial Mount, investigating the overall performance of such off-the-shelf solutions in both research and teaching applications. We conclude that PIRATE is a cost-effective research facility, and it also provides exciting prospects for undergraduate astronomy. PIRATE has broken new ground in offering practical astronomy education to distance-learning students in their own homes.

  6. The National Ignition Facility: alignment from construction to shot operations

    NASA Astrophysics Data System (ADS)

    Burkhart, S. C.; Bliss, E.; Di Nicola, P.; Kalantar, D.; Lowe-Webb, R.; McCarville, T.; Nelson, D.; Salmon, T.; Schindler, T.; Villanueva, J.; Wilhelmsen, K.

    2010-08-01

    The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.

  7. Exploring Operational Safeguards, Safety, and Security by Design to Address Real Time Threats in Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schanfein, Mark J.; Mladineo, Stephen V.

    2015-07-07

    Over the last few years, significant attention has been paid to both encourage application and provide domestic and international guidance for designing in safeguards and security in new facilities.1,2,3 However, once a facility is operational, safeguards, security, and safety often operate as separate entities that support facility operations. This separation is potentially a serious weakness should insider or outsider threats become a reality.Situations may arise where safeguards detects a possible loss of material in a facility. Will they notify security so they can, for example, check perimeter doors for tampering? Not doing so might give the advantage to an insidermore » who has already, or is about to, move nuclear material outside the facility building. If outsiders break into a facility, the availability of any information to coordinate the facility’s response through segregated alarm stations or a failure to include all available radiation sensors, such as safety’s criticality monitors can give the advantage to the adversary who might know to disable camera systems, but would most likely be unaware of other highly relevant sensors in a nuclear facility.This paper will briefly explore operational safeguards, safety, and security by design (3S) at a high level for domestic and State facilities, identify possible weaknesses, and propose future administrative and technical methods, to strengthen the facility system’s response to threats.« less

  8. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value... determine the number of meals received by volunteers who receive food and beverages at a hospital, free or... volunteers. If an employer charges nonemployees a greater amount than employees, in determining whether the...

  9. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value... determine the number of meals received by volunteers who receive food and beverages at a hospital, free or... volunteers. If an employer charges nonemployees a greater amount than employees, in determining whether the...

  10. 26 CFR 1.132-7 - Employer-operated eating facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Employer-operated eating facilities. (a) In general—(1) Condition for exclusion—(i) General rule. The value... determine the number of meals received by volunteers who receive food and beverages at a hospital, free or... volunteers. If an employer charges nonemployees a greater amount than employees, in determining whether the...

  11. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less

  12. 1st Quarter Transportation Report FY2017: Waste Shipments To and From the Nevada National Security Site (NNSS), Radioactive Waste Management Complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 1st quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW) and classified non-radioactive (CNR) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2017.

  13. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  14. 29 CFR 548.306 - Average earnings for year or quarter year preceding the current quarter.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PAY Interpretations Authorized Basic Rates § 548.306 Average earnings for year or quarter year... regular rates of pay during the current quarter year, and (ii) such average hourly remuneration during the... 29 Labor 3 2011-07-01 2011-07-01 false Average earnings for year or quarter year preceding the...

  15. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  16. Natural Gas Imports and Exports. Third Quarter Report 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditionsmore » and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network

  17. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  18. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  19. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  20. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  1. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  2. 46 CFR 160.151-47 - Requirements for owners or operators of servicing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities. 160.151-47 Section 160.151-47 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151-47 Requirements for owners or operators of servicing facilities. To maintain...

  3. 48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment for... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations...

  4. The emergence of care facilities in Thailand for older German-speaking people: structural backgrounds and facility operators as transnational actors.

    PubMed

    Bender, Désirée; Hollstein, Tina; Schweppe, Cornelia

    2017-12-01

    This paper presents findings from an ethnographic study of old age care facilities for German-speaking people in Thailand. It analyses the conditions and processes behind the development and specific designs of such facilities. It first looks at the intertwinement, at the socio-structural level, of different transborder developments in which the facilities' emergence is embedded. Second, it analyses the processes that accompany the emergence, development and organisation of these facilities at the local level. In this regard, it points out the central role of the facility operators as transnational actors who mediate between different frames of reference and groups of actors involved in these facilities. It concludes that the processes of mediation and intertwining are an important and distinctive feature of the emergence of these facilities, necessitated by the fact that, although the facilities are located in Thailand, their 'markets' are in the German-speaking countries of their target groups.

  5. Study of the Relevance of the Quality of Care, Operating Efficiency and Inefficient Quality Competition of Senior Care Facilities.

    PubMed

    Lin, Jwu-Rong; Chen, Ching-Yu; Peng, Tso-Kwei

    2017-09-11

    The purpose of this research is to examine the relation between operating efficiency and the quality of care of senior care facilities. We designed a data envelopment analysis, combining epsilon-based measure and metafrontier efficiency analyses to estimate the operating efficiency for senior care facilities, followed by an iterative seemingly unrelated regression to evaluate the relation between the quality of care and operating efficiency. In the empirical studies, Taiwan census data was utilized and findings include the following: Despite the greater operating scale of the general type of senior care facilities, their average metafrontier technical efficiency is inferior to that of nursing homes. We adopted senior care facility accreditation results from Taiwan as a variable to represent the quality of care and examined the relation of accreditation results and operating efficiency. We found that the quality of care of general senior care facilities is negatively related to operating efficiency; however, for nursing homes, the relationship is not significant. Our findings show that facilities invest more in input resources to obtain better ratings in the accreditation report. Operating efficiency, however, does not improve. Quality competition in the industry in Taiwan is inefficient, especially for general senior care facilities.

  6. Study of the Relevance of the Quality of Care, Operating Efficiency and Inefficient Quality Competition of Senior Care Facilities

    PubMed Central

    Lin, Jwu-Rong; Chen, Ching-Yu; Peng, Tso-Kwei

    2017-01-01

    The purpose of this research is to examine the relation between operating efficiency and the quality of care of senior care facilities. We designed a data envelopment analysis, combining epsilon-based measure and metafrontier efficiency analyses to estimate the operating efficiency for senior care facilities, followed by an iterative seemingly unrelated regression to evaluate the relation between the quality of care and operating efficiency. In the empirical studies, Taiwan census data was utilized and findings include the following: Despite the greater operating scale of the general type of senior care facilities, their average metafrontier technical efficiency is inferior to that of nursing homes. We adopted senior care facility accreditation results from Taiwan as a variable to represent the quality of care and examined the relation of accreditation results and operating efficiency. We found that the quality of care of general senior care facilities is negatively related to operating efficiency; however, for nursing homes, the relationship is not significant. Our findings show that facilities invest more in input resources to obtain better ratings in the accreditation report. Operating efficiency, however, does not improve. Quality competition in the industry in Taiwan is inefficient, especially for general senior care facilities. PMID:28892019

  7. Design data package and operating procedures for MSFC solar simulator test facility

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Design and operational data for the solar simulator test facility are reviewed. The primary goal of the facility is to evaluate the performance capacibility and worst case failure modes of collectors, which utilize either air or liquid transport media. The facility simulates environmental parameters such as solar radiation intensity, solar spectrum, collimation, uniformity, and solar attitude. The facility also simulates wind conditions of velocity and direction, solar system conditions imposed on the collector, collector fluid inlet temperature, and geometric factors of collector tilt and azimuth angles. Testing the simulator provides collector efficiency data, collector time constant, incident angle modifier data, and stagnation temperature values.

  8. FACILITY 814, COURTYARD AND NORTHEAST WING, VIEW FACING SOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, COURTYARD AND NORTHEAST WING, VIEW FACING SOUTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  9. Facility Management Child Care Resource Book. Child Care Operations Center of Expertise.

    ERIC Educational Resources Information Center

    General Services Administration, Washington, DC. Public Buildings Service.

    This guidebook provides maintenance and operations guidelines for managing General Services Administration (GSA) child care centers within the same standards and level of a GSA operated facility. Areas covered address cleaning standards and guidelines; equipment funding and inventory; maintenance of living environments and problem areas;…

  10. Joint Force Quarterly. Number 1, Summer 1993

    DTIC Science & Technology

    1993-01-01

    Contributors Joint Force Quarterly A PROFESSIONAL MILITARY JOURNAL Editor-in-Chief Alvin H. Bernstein Executive Editor Patrick M. Cronin Managing Editor Robert...understanding of the integrated employ- ment of land, sea, air, space, and special operations forces. The journal focuses on joint doctrine, coalition...other agency of the Federal Government. Por- tions of this journal are protected by copyright and may not be reproduced or extracted without the

  11. 75 FR 54543 - Changes to NARA Facilities' Hours of Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION 36 CFR Parts 1253, 1254, and 1280 [NARA-10-0004] RIN 3095-AB68 Changes to NARA Facilities' Hours of Operation AGENCY: National Archives and Records Administration. ACTION: Proposed rule. SUMMARY: The National Archives and Records Administration (NARA) is...

  12. Meeting the challenges of bringing a new base facility operation model to Gemini Observatory

    NASA Astrophysics Data System (ADS)

    Nitta, Atsuko; Arriagada, Gustavo; Adamson, A. J.; Cordova, Martin; Nunez, Arturo; Serio, Andrew; Kleinman, Scot

    2016-08-01

    The aim of the Gemini Observatory's Base Facilities Project is to provide the capabilities to perform routine night time operations with both telescopes and their instruments from their respective base facilities without anyone present at the summit. Tightening budget constraints prompted this project as both a means to save money and an opportunity to move toward increasing remote operations in the future. We successfully moved Gemini North nighttime operation to our base facility in Hawaii in Nov., 2015. This is the first 8mclass telescope to completely move night time operations to base facility. We are currently working on implementing BFO to Gemini South. Key challenges for this project include: (1) This is a schedule driven project. We have to implement the new capabilities by the end of 2015 for Gemini North and end of 2016 for Gemini South. (2) The resources are limited and shared with operations which has the higher priority than our project. (3) Managing parallel work within the project. (4) Testing, commissioning and introducing new tools to operational systems without adding significant disruptions to nightly operations. (5) Staff buying to the new operational model. (6) The staff involved in the project are spread on two locations separated by 10,000km, seven time zones away from each other. To overcome these challenges, we applied two principles: "Bare Minimum" and "Gradual Descent". As a result, we successfully completed the project ahead of schedule at Gemini North Telescope. I will discuss how we managed the cultural and human aspects of the project through these concepts. The other management aspects will be presented by Gustavo Arriagada [2], the Project Manager of this project. For technical details, please see presentations from Andrew Serio [3] and Martin Cordova [4].

  13. Virtual Close Quarter Battle (CQB) Graphical Decision Trainer

    DTIC Science & Technology

    2002-09-01

    leave a gap in what would traditionally be thought of as an ideal locomotion device. Research has shown that the introduction of vestibular cues in...NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS VIRTUAL CLOSE QUARTER BATTLE (CQB) GRAPHICAL DECISION TRAINER by Jordan Reece...including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson

  14. 78 FR 22576 - Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... Facility Operating License Involving Proposed No Significant Hazards Consideration Determination; San... Operating License No. NPF-10, issued to Southern California Edison (SCE, the licensee), for operation of the... operating conditions'' and ``normal steady state full power operation'' and restricts operation to 70...

  15. English Leadership Quarterly. 1991.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1991-01-01

    These four issues of the English Leadership Quarterly represent the quarterly for 1991. Articles in number 1 deal with whole language and include: "CEL: Shorter and Better" (Myles D. Eley); "Toward a New Philosophy of Language Learning" (Kathleen Strickland); "Whole Language: Implications for Secondary Classrooms"…

  16. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  17. Effects of Interpersonal Skills Training on MRI Operations in a Saturated Market: A Randomized Trial.

    PubMed

    Ajam, Amna A; Nguyen, Xuan V; Kelly, Ronda A; Ladapo, Joseph A; Lang, Elvira V

    2017-07-01

    The aim of this study was to assess the effects of team training on operational efficiency during outpatient MRI. In this institutional review board-approved, HIPAA-compliant study, six MRI outpatient sites of a midwestern hospital system were randomized to serve as controls or have their teams trained in advanced communication skills. The fourth quarter of fiscal year 2015 was the trial baseline. The trial ended in the third quarter (Q3) of fiscal year 2016 (FY16). Equipment utilization (completed scans/available slots), hourly scan rates (total orders completed per machine per hour of operation), and no-show rates stratified by time were analyzed using the Cochran-Mantel-Haenszel method, with individual comparisons performed with Bonferroni correction. The study encompassed 27,425 MRI examinations. Overall volume peaked at baseline and then declined over the following quarters. Compared with baseline, untrained sites experienced significant drops in equipment utilization (P < .01 for the first quarter of FY16 and P < .0001 for the second quarter of FY16 and Q3 FY16), decreasing from 77% to 65% over the study period, corresponding to a decrease from 1.15 to 0.97 in hourly scan rates. For trained sites, these metrics showed no significant change, with maintenance of hourly scan rates of 1.23 and 1.27 and equipment utilization rates of 83% and 85% between baseline and Q3 FY16. No-show rates remained stable at trained sites but increased at untrained sites in the last two quarters (P < .05). Nationally benchmarked patient satisfaction percentile ranking gradually increased at trained sites from 56th at baseline to 70th and successively decreased at untrained sites from 66th to 44th. MRI outpatient facilities trained in advanced communication techniques may have more favorable operational efficiency than untrained sites in a saturated market. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  18. Global Positioning System: Observations on Quarterly Reports from the Air Force

    DTIC Science & Technology

    2016-10-17

    Positioning System : Observations on Quarterly Reports from the Air Force The satellite-based Global Positioning System (GPS) provides positioning, navigation...infrastructure, and transportation safety. The Department of Defense (DOD)—specifically, the Air Force—develops and operates the GPS system , which...programs, including the most recent detailed assessment of the next generation operational control system (OCX) and development of military GPS

  19. Feasibility study for a transportation operations system cask maintenance facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the caskmore » systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.« less

  20. Space facilities: Meeting future needs for research, development, and operations

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  1. Space facilities: Meeting future needs for research, development, and operations

    NASA Astrophysics Data System (ADS)

    The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

  2. Development of cloud-operating platform for detention facility design

    NASA Astrophysics Data System (ADS)

    Tun Lee, Kwan; Hung, Meng-Chiu; Tseng, Wei-Fan; Chan, Yi-Ping

    2017-04-01

    In the past 20 years, the population of Taiwan has accumulated in urban areas. The land development has changed the hydrological environment and resulted in the increase of surface runoff and shortened the time to peak discharge. The change of runoff characteristics increases the flood risk and reduces resilient ability of the city during flood. Considering that engineering measures may not be easy to implement in populated cities, detention facilities set on building basements have been proposed to compromise the increase of surface runoff resulting from development activities. In this study, a web-based operational platform has been developed to integrate the GIS technologies, hydrological analyses, as well as relevant regulations for the design of detention facilities. The design procedure embedded in the system includes a prior selection of type and size of the detention facility, integrated hydrological analysis for the developing site, and inspection of relevant regulations. After login the platform, designers can access the system database to retrieve road maps, land use coverages, and storm sewer information. Once the type, size, inlet, and outlet of the detention facility are assigned, the system can acquire the rainfall intensity-duration-frequency information from adjacent rain gauges to perform hydrological analyses for the developing site. The increase of the runoff volume due to the development and the reduction of the outflow peak through the construction of the detention facility can be estimated. The outflow peak at the target site is then checked with relevant regulations to confirm the suitability of the detention facility design. The proposed web-based platform can provide a concise layout of the detention facility and the drainageway of the developing site on a graphical interface. The design information can also be delivered directly through a web link to authorities for inspecting to simplify the complex administrative procedures.

  3. ARM Climate Research Facility Quarterly Ingest Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, A.; Sivaraman, C.

    2016-10-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  4. ARM Climate Research Facility Quarterly Ingest Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koontz, A.; Sivaraman, C.

    2016-07-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  5. Land developer participation in providing for bus transit facilities and operations

    DOT National Transportation Integrated Search

    2002-03-01

    This report provides an overview of the various non-regulatory and regulatory approaches for engaging private sector land developer participation in contributing toward the provision of public bus transit capital facilities and the cost of operations...

  6. FACILITY 363, INTERIOR. LANAI OFF KITCHEN. VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. LANAI OFF KITCHEN. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  7. Data Management Facility Operations Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  8. Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.

  9. Operational Experience of an Open-Access, Subscription-Based Mass Spectrometry and Proteomics Facility.

    PubMed

    Williamson, Nicholas A

    2018-03-01

    This paper discusses the successful adoption of a subscription-based, open-access model of service delivery for a mass spectrometry and proteomics facility. In 2009, the Mass Spectrometry and Proteomics Facility at the University of Melbourne (Australia) moved away from the standard fee for service model of service provision. Instead, the facility adopted a subscription- or membership-based, open-access model of service delivery. For a low fixed yearly cost, users could directly operate the instrumentation but, more importantly, there were no limits on usage other than the necessity to share available instrument time with all other users. All necessary training from platform staff and many of the base reagents were also provided as part of the membership cost. These changes proved to be very successful in terms of financial outcomes for the facility, instrument access and usage, and overall research output. This article describes the systems put in place as well as the overall successes and challenges associated with the operation of a mass spectrometry/proteomics core in this manner. Graphical abstract ᅟ.

  10. Operational Experience of an Open-Access, Subscription-Based Mass Spectrometry and Proteomics Facility

    NASA Astrophysics Data System (ADS)

    Williamson, Nicholas A.

    2018-03-01

    This paper discusses the successful adoption of a subscription-based, open-access model of service delivery for a mass spectrometry and proteomics facility. In 2009, the Mass Spectrometry and Proteomics Facility at the University of Melbourne (Australia) moved away from the standard fee for service model of service provision. Instead, the facility adopted a subscription- or membership-based, open-access model of service delivery. For a low fixed yearly cost, users could directly operate the instrumentation but, more importantly, there were no limits on usage other than the necessity to share available instrument time with all other users. All necessary training from platform staff and many of the base reagents were also provided as part of the membership cost. These changes proved to be very successful in terms of financial outcomes for the facility, instrument access and usage, and overall research output. This article describes the systems put in place as well as the overall successes and challenges associated with the operation of a mass spectrometry/proteomics core in this manner. [Figure not available: see fulltext.

  11. Electric Power Quarterly, July-September 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-29

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the Energy Information Administration (EIA), to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275) as amended. This edition of the EPQ contains monthly data for the third quarter of 1985.

  12. Results For The Fourth Quarter 2014 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2015-09-30

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2014 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

  13. Design and operation of an outdoor microalgae test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weissman, J.C.; Tillett, D.M.; Goebel, R.P.

    The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting costmore » objectives.« less

  14. National Transonic Facility: A review of the operational plan

    NASA Technical Reports Server (NTRS)

    Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.

    1980-01-01

    The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.

  15. FACILITY 814, FRONT AND SOUTHEAST SIDE, OBLIQUE VIEW FACING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, FRONT AND SOUTHEAST SIDE, OBLIQUE VIEW FACING NORTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  16. FACILITY 814, COURTYARD AND SOUTHEAST WING, OBLIQUE VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, COURTYARD AND SOUTHEAST WING, OBLIQUE VIEW FACING SOUTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  17. FACILITY 802B, BEDROOM ADJACENT TO BATHROOM, VIEW FACING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, BEDROOM ADJACENT TO BATHROOM, VIEW FACING NORTH. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  18. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report.

  19. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  20. Operational Concept for the Smart Landing Facility (SLF)

    NASA Technical Reports Server (NTRS)

    Thompson, S. D.; Bussolari, S. R.

    2001-01-01

    The purpose of this document is to describe an operational concept for the Smart Landing Facility (SLF). The SLF is proposed as a component of the Small Aircraft Transportation System (SATS) and is envisioned to utilize Communication, Navigation, Surveillance and Air Traffic Management (CNS/ATM) technologies to support higher-volume air traffic operations in a wider variety of weather conditions than are currently possible at airports without an Air Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACON). In order to accomplish this, the SLF will provide aircraft sequencing and separation within its terminal airspace (the SLF traffic area) and on the airport surface. The approach taken in this report is to first define and describe the SLF environment and the type of operations and aircraft that must be supported. Services currently provided by an ATCT and TRACON are reviewed and assembled into a set of high-level operational functions. A description of the applicable CNS/ATM technologies that have been deployed in the NAS (National Airspace System) or have been demonstrated to be operationally feasible is presented. A candidate SLF system concept that employs the CNS/ATM technologies is described. This is followed by SLF operational scenarios for minimally-equipped aircraft and for aircraft fully-equipped to make full use of SLF services. An assessment is made of the SLF technology and key research issues are identified.

  1. Basis for Interim Operation for Fuel Supply Shutdown Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENECKE, M.W.

    2003-02-03

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium

  2. Design philosophy and operating experience with the WNRE Hot Cell Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, R.G.; Seymour, C.G.; Ryz, M.A.

    1969-10-15

    The objective of radiation safety and operating efficiency often conflict. The key to preventing this conflict is proper design. In this paper we discuss how both objectives have been met in the Whiteshell Nuclear Research Establishment (WNRE) Hot Cell Facilities.

  3. Budgeting Facilities Operation Costs Using the Facilities Operation Model

    DTIC Science & Technology

    2011-06-01

    practices that today’s modern buildings have built into them. Several factors can change from the time the requirement is generated to when actual...information is estimated to average 1 hour per response, including the time for reviewing instruction, searching existing data sources, gathering and...BOS required $4.2 billion.2 In FY2012, it is estimated it will reach $4.6 billion.3 Unlike sustainment and modernization , failure to fund facility

  4. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  5. FACILITY 802B, LIVING ROOM AND ENTRY, VIEW FACING EASTNORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, LIVING ROOM AND ENTRY, VIEW FACING EAST-NORTHEAST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  6. FACILITY 89. WEST FRONT. U.S. Naval Base, Pearl Harbor, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. WEST FRONT. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  7. 75 FR 18255 - Passenger Facility Charge Database System for Air Carrier Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Facility Charge Database System for Air Carrier Reporting AGENCY: Federal Aviation Administration (FAA... the Passenger Facility Charge (PFC) database system to report PFC quarterly report information. In... developed a national PFC database system in order to more easily track the PFC program on a nationwide basis...

  8. 75 FR 68831 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...-safeguards information (SUNSI). The amendments would approve the proposed Cyber Security Plan and... Commission-approved Cyber Security Plan as required by 10 CFR 73.54. Basis for proposed no significant... Facility Operating License (FOL) to implement and maintain a Cyber Security Plan as part of the facility's...

  9. FACILITY 89. INTERIOR OF MASTER BATHROOM. VIEW FACING SOUTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF MASTER BATHROOM. VIEW FACING SOUTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  10. SSBRP User Operations Facility (UOF) Overview and Development Strategy

    NASA Technical Reports Server (NTRS)

    Picinich, Lou; Stone, Thom; Sun, Charles; Windrem, May; Givens, John J. (Technical Monitor)

    1995-01-01

    This paper will present the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF) architecture and development strategy. A major element of the UOF at NASA Ames Research Center, the Communication and Data System (CDS) will be the primary focus of the discussions. CDS operational, telescience, security, and development objectives will be discussed along with CDS implementation strategy. The implementation strategy discussions will include: Object Oriented Analysis & Design, System & Software Prototyping, and Technology Utilization. A CDS design overview that includes: CDS Context Diagram, CDS Architecture, Object Models, Use Cases, and User Interfaces will also be presented. CDS development brings together "cutting edge" technologies and techniques such as: object oriented development, network security, multimedia networking, web-based data distribution, JAVA, and graphical user interfaces. Use of these "cutting edge" technologies and techniques translates directly to lower development and operations costs.

  11. SIGAR Quarterly Report to the United States Congress

    DTIC Science & Technology

    2016-10-30

    communication events.286 A Directorate of Local Governance spokeswoman participated in the MOD/MOI information operations in Nangarhar during July –August and...remaining to be procured.”392 This quarter EF-5 Information , Communication , and Technology advisors conducted a bottom-up review of the entire MOD... Information System Data Quality Assessment Education has long been a concern of both the Afghan government and the international community . To better

  12. Disability self-assessment and upper quarter muscle balance between female dental hygienists and non-dental hygienists.

    PubMed

    Johnson, Eric G; Godges, Joseph J; Lohman, Everett B; Stephens, Joni A; Zimmerman, Grenith J; Anderson, Sharon P

    2003-01-01

    The purpose of this pilot study was to compare disability self-assessment and upper quarter muscle balance female dental hygienists and non dental hygienist females. The upper quarter was operationally defined as the shoulder and neck region. Muscle balance was operationally defined as muscle flexibility and muscle performance. A convenience sample of 41 working dental hygienists and 46 non dental hygienists participated in the study. Muscle flexibility of the upper quarter was measured by inclinometry or standard muscle length testing. Muscle performance was measured by timing the duration of four statically maintained positions. Subjects filled out the Northwick Park Neck Pain Questionnaire (NPNPQ), which is a disability self-assessment. Analysis of Covariance (ANCOVA) was used during data analysis to adjust for the mean age difference between the dental hygienist group (38.0 years) and the non-dental hygienist group (29.3 years). The results of this pilot study suggest that female dental hygienists are more likely than non dental hygienist females to develop tightness in the upper trapezius (p = 0.007) and the levator scapula (p = 0.01) of the non dominant upper quarter and lower fibers of the pectoralis major of the dominant upper quarter (p = 0.03) Muscle performance trends in the dental hygienist group supported muscle balance theory that short muscles remain strong while lengthened muscles become weak. The dental hygienist group had higher disability scores in all nine parts of the NPNPQ compared to the non-dental hygienist group, five of which were statistically significant (p < 0.05). The results of this pilot study suggest that muscle imbalances in the upper quarter are more common in female dental hygienists than in female non dental hygienists and may contribute to the numerous upper quarter pathologies associated with the practice of dental hygiene. Further research is needed to determine if upper quarter strengthening and flexibility exercises

  13. Multipacting-free quarter-wavelength choke joint design for BNL SRF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, W.; Belomestnykh, S.; Ben-Zvi, I.

    The BNL SRF gun cavity operated well in CW mode up to 2 MV. However, its performance suffered due to multipacting in the quarter-wavelength choke joint. A new multipacting-free cathode stalk was designed and conditioned. This paper describes RF and thermal design of the new cathode stalk and its conditioning results.

  14. Linking and Combining Distributed Operations Facilities using NASA's "GMSEC" Systems Architectures

    NASA Technical Reports Server (NTRS)

    Smith, Danford; Grubb, Thomas; Esper, Jaime

    2008-01-01

    NASA's Goddard Mission Services Evolution Center (GMSEC) ground system architecture has been in development since late 2001, has successfully supported eight orbiting satellites and is being applied to many of NASA's future missions. GMSEC can be considered an event-driven service-oriented architecture built around a publish/subscribe message bus middleware. This paper briefly discusses the GMSEC technical approaches which have led to significant cost savings and risk reduction for NASA missions operated at the Goddard Space Flight Center (GSFC). The paper then focuses on the development and operational impacts of extending the architecture across multiple mission operations facilities.

  15. Operational considerations in monitoring oxygen levels at the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Zalenski, M. A.; Rowe, E. L.; Mcphee, J. R.

    1985-01-01

    Laboratory monitoring of the level of oxygen in sample gas mixtures is a process which can be performed with accurate and repeatable results. Operations at the National Transonic Facility require the storage and pumping of large volumes of liquid nitrogen. To protect against the possibility of a fault resulting in a localized oxygen deficient atmosphere, the facility is equipped with a monitoring system with an array of sensors. During the early operational stages, the system produced recurrent alarms, none of which could be traced to a true oxygen deficiency. A thorough analysis of the system was undertaken with primary emphasis placed on the sensor units. These units sense the partial pressure of oxygen which, after signal conditioning, is presented as a % by volume indication at the system output. It was determined that many of the problems experienced were due to a lack of proper accounting for the partial pressure/% by volume relationship, with a secondary cause being premature sensor failure. Procedures were established to consider atmospherically induced partial pressure variations. Sensor rebuilding techniques were examined, and those elements contributing to premature sensor failure were identified. The system now operates with a high degree of confidence and reliability.

  16. The WSTIAC Quarterly. Volume 9, Number 4

    DTIC Science & Technology

    2010-04-28

    elements of command– Major Eric D. Trias Captain Bryan M. Bell US Air Force You have to know the past to understand the present. — Carl Sagan This article is...Quarterly, Volume 9, Number 4 3 INTRODUCTION Carl von Clausewitz defined war as “…an act of violence intended to compel our opponent to fulfill our will...controlled systems. NOTES & REFERENCES ‡ Joint Pub 3-13 provides the doctrinal foundation for the conduct of IO in joint operations. [1] von Clausewitz, Carl

  17. FACILITY 814, SOUTHEAST SIDE AND REAR, SHOWING COURTYARD BETWEEN WINGS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 814, SOUTHEAST SIDE AND REAR, SHOWING COURTYARD BETWEEN WINGS, OBLIQUE VIEW FACING WEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  18. FACILITY 52. EAST FRONT. VIEW FACING WEST. U.S. Naval ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 52. EAST FRONT. VIEW FACING WEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type J, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  19. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  20. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  1. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...

  2. Orbital operations with the Shuttle Infrared Telescope Facility /SIRTF/

    NASA Technical Reports Server (NTRS)

    Werner, M. W.; Lorell, K. R.

    1981-01-01

    The Shuttle Infrared Telescope Facility (SIRTF) is a cryogenically-cooled, 1-m-class telescope that will be operated from the Space Shuttle as an observatory for infrared astronomy. This paper discusses the scientific constraints on and the requirements for pointing and controlling SIRTF as well as several aspects of SIRTF orbital operations. The basic pointing requirement is for an rms stability of 0.25 arcsec, which is necessary to realize the full angular resolution of the 5-micron diffraction-limited SIRTF. Achieving this stability requires the use of hardware and software integral to SIRTF working interactively with the gyrostabilized Shuttle pointing-mount. The higher sensitivity of SIRTF, together with orbital and time constraints, puts a premium on rapid target acquisition and on efficient operational and observational procedures. Several possible acquisition modes are discussed, and the importance of source acquisition by maximizing the output of an infrared detector is emphasized.

  3. Quarterly coal report, October--December 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-05-23

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1994 and aggregated quarterlymore » historical data for 1986 through the third quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.« less

  4. Electric power quarterly, January-March 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-07-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, Federal and State agencies, industry, and the general public.

  5. Integrated Urban Flood Analysis considering Optimal Operation of Flood Control Facilities in Urban Drainage Networks

    NASA Astrophysics Data System (ADS)

    Moon, Y. I.; Kim, M. S.; Choi, J. H.; Yuk, G. M.

    2017-12-01

    eavy rainfall has become a recent major cause of urban area flooding due to the climate change and urbanization. To prevent property damage along with casualties, a system which can alert and forecast urban flooding must be developed. Optimal performance of reducing flood damage can be expected of urban drainage facilities when operated in smaller rainfall events over extreme ones. Thus, the purpose of this study is to execute: A) flood forecasting system using runoff analysis based on short term rainfall; and B) flood warning system which operates based on the data from pump stations and rainwater storage in urban basins. In result of the analysis, it is shown that urban drainage facilities using short term rainfall forecasting data by radar will be more effective to reduce urban flood damage than using only the inflow data of the facility. Keywords: Heavy Rainfall, Urban Flood, Short-term Rainfall Forecasting, Optimal operating of urban drainage facilities. AcknowledgmentsThis research was supported by a grant (17AWMP-B066744-05) from Advanced Water Management Research Program (AWMP) funded by Ministry of Land, Infrastructure and Transport of Korean government.

  6. 19 CFR 159.34 - Certified quarterly rate.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY (CONTINUED) LIQUIDATION OF DUTIES Conversion of Foreign Currency § 159.34 Certified quarterly rate. (a) Countries for which quarterly rate is certified. For the currency of each of the following... York for such foreign currency for a day in that quarter: Australia, Austria, Belgium, Brazil, Canada...

  7. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  8. Ground systems and operations concepts for the Space Infrared Telescope Facility (SIRTF)

    NASA Technical Reports Server (NTRS)

    Miller, Richard B.

    1991-01-01

    Key requirements and ground systems implementation strategy for SIRTF which presents a significant challenge in the operational phase of the mission are discussed. The facility is aimed at reliably integrating a guaranteed time program, requests from about 200 guest observer teams per year, and observatory maintenance. SIRFT is characterized by the five-year life time due to cryogen boil-off which means that the ground system must be fully operational at launch and must operate with an efficiency and timeliness rarely achieved in previous space missions.

  9. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...

  10. Space ultra-vacuum facility and method of operation

    NASA Technical Reports Server (NTRS)

    Naumann, Robert J. (Inventor)

    1988-01-01

    A wake shield space processing facility (10) for maintaining ultra-high levels of vacuum is described. The wake shield (12) is a truncated hemispherical section having a convex side (14) and a concave side (24). Material samples (68) to be processed are located on the convex side of the shield, which faces in the wake direction in operation in orbit. Necessary processing fixtures (20) and (22) are also located on the convex side. Support equipment including power supplies (40, 42), CMG package (46) and electronic control package (44) are located on the convex side (24) of the shield facing the ram direction. Prior to operation in orbit the wake shield is oriented in reverse with the convex side facing the ram direction to provide cleaning by exposure to ambient atomic oxygen. The shield is then baked-out by being pointed directed at the sun to obtain heating for a suitable period.

  11. FACILITY 363, INTERIOR. LIVING ROOM LOOKING TOWARDS BLACK LANAI. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. LIVING ROOM LOOKING TOWARDS BLACK LANAI. VIEW FACING NORTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  12. FACILITY 802B, BATHROOM CONVERTED TO LAUNDRY ROOM, VIEW FACING WESTNORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, BATHROOM CONVERTED TO LAUNDRY ROOM, VIEW FACING WEST-NORTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  13. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With...

  14. Earth integrated design: office dormitory facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H. B.; Barnes, P. R.

    1980-01-01

    The generation process of the design of the Joint Institute for Heavy Ion Research is described. Architectural and energy considerations are discussed. The facility will contain living quarters for guest scientists who come to Oak Ridge to conduct short experiments and sleeping alcoves for local researchers on long experimental shifts as well as office space. (MHR)

  15. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1994 through June 1996

    USGS Publications Warehouse

    Torikai, J.D.

    1996-01-01

    This report describes the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1994 through June 1996, with a focus on data from April through June 1996 (second quarter of 1996). A complete database of ground-water withdrawals and chloride-concentration records since 1985 is maintained by the U.S. Geological Survey. Cumulative rainfall for April through June 1996 was 22.64 inches, which is 12 percent more than the mean cumulative rainfall of 20.21 inches for April through June. The period April through June is part of the annual dry season. Ground-water withdrawal during April through June 1996 averaged 1,048,000 gallons per day. Withdrawal for the same 3 months in 1995 averaged 833,700 gallons per day. Withdrawal patterns during the second quarter of 1996 did not change significantly since 1991, with the Cantonment and Air Operations areas supplying about 99 percent of total islandwide pumpage. At the end of June 1996, the chloride concentration of water from the elevated tanks at Cantonment and Air Operations were 52 and 80 milligrams per liter, respectively. The chloride data from all five production areas showed no significant upward or downward trends throughout the second quarter of 1996. Potable levels of chloride concentrations have been maintained by adjusting individual pumping rates, and also because of the absence of long-term droughts. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations also showed no significant trends throughout the second quarter of 1996. Chloride concentrations have been about the same since the last quarter of 1995. A fuel-pipeline leak at Air Operations in May 1991 decreased total islandwide withdrawals by 15 percent. This lost pumping capacity is being offset by increased pumpage at Cantonment. Six wells do not contribute to the water supply because they are being used to hydraulically divert fuel migration away from water

  16. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1994 through March 1996

    USGS Publications Warehouse

    Torikai, J.D.

    1996-01-01

    This report describes the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1994 through March 1996, with a focus on data from January through March 1996 (first quarter of 1996). A complete database of ground-water withdrawals and chloride-concentration records since 1985 is maintained by the U.S. Geological Survey. Cumulative rainfall for January through March 1996 was about 30 inches, which is 9 percent less than the mean cumulative rainfall of about 33 inches for January through March. The period January through February is the end of the annual wet season, while March marks the start of the annual dry season. Ground-water withdrawal during January through March 1996 averaged 970,300 gallons per day. Withdrawal for the same 3 months in 1995 averaged 894,600 gallons per day. With- drawal patterns during the first quarter of 1996 did not change significantly since 1991, with the Cantonment and Air Operations areas supplying about 99 percent of total islandwide pumpage. At the end of March 1996, the chloride concentration of water from the elevated tanks at Cantonment and Air Operations were 47 and 80 milligrams per liter, respectively. The chloride data from all five production areas showed no significant upward or downward trends throughout the first quarter of 1996. Potable levels of chloride concentrations have been maintained by adjusting individual pumping rates, and also because of the absence of long-term droughts. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations also showed no significant trends throughout the first quarter of 1996. Chloride concentrations have been about the same since the last quarter of 1995. A fuel-pipeline leak at Air Operations in May 1991 decreased total islandwide withdrawals by 15 percent. This lost pumping capacity is being offset by increased pumpage at Cantonment. Six wells do not contribute to the water supply because they

  17. Description and operational status of the National Transonic Facility computer complex

    NASA Technical Reports Server (NTRS)

    Boyles, G. B., Jr.

    1986-01-01

    This paper describes the National Transonic Facility (NTF) computer complex and its support of tunnel operations. The capabilities of the research data acquisition and reduction are discussed along with the types of data that can be acquired and presented. Pretest, test, and posttest capabilities are also outlined along with a discussion of the computer complex to monitor the tunnel control processes and provide the tunnel operators with information needed to control the tunnel. Planned enhancements to the computer complex for support of future testing are presented.

  18. FACILITY 363, INTERIOR. KITCHEN AS SEEN FROM LIVING ROOM ENTRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. KITCHEN AS SEEN FROM LIVING ROOM ENTRY . VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  19. FACILITY 363, INTERIOR. PANTRY AS SEEN FROM LANAI OFF KITCHEN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 363, INTERIOR. PANTRY AS SEEN FROM LANAI OFF KITCHEN . VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hospital Point, Pharmacist's Quarters Type, 13-16 First Street, Pearl City, Honolulu County, HI

  20. FACILITY 52. OBLIQUE OF REAR AND SIDE. VIEW FACING SOUTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 52. OBLIQUE OF REAR AND SIDE. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type J, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  1. FACILITY 89. OBLIQUE OF SIDE AND REAR. VIEW FACING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. OBLIQUE OF SIDE AND REAR. VIEW FACING SOUTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  2. FACILITY 89. FRONT OBLIQUE TAKEN FROM DRIVEWAY. VIEW FACING NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. FRONT OBLIQUE TAKEN FROM DRIVEWAY. VIEW FACING NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  3. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of the...

  4. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of the...

  5. 43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, include in your monthly report of facility operations: (1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each; (2) The temperature of the steam or hot water in deg. F; (3) The pressure of the...

  6. FACILITY 802B, HALLWAY, LOOKING TOWARD REAR OF HOUSE, VIEW FACING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 802B, HALLWAY, LOOKING TOWARD REAR OF HOUSE, VIEW FACING SOUTH-SOUTHWEST. - Schofield Barracks Military Reservation, Bachelor Officers' Quarters Type, Between Grimes & Tidball Streets near Ayres Avenue, Wahiawa, Honolulu County, HI

  7. High Performance Computing Facility Operational Assessment 2015: Oak Ridge Leadership Computing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barker, Ashley D.; Bernholdt, David E.; Bland, Arthur S.

    Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals: supporting users; delivering fast, reliable systems; creating innovative solutions for high-performance computing (HPC) needs; and managing risks, safety, and security aspects associated with operating one of the most powerful computers in the world. The results can be seen in the cutting-edge science delivered by users and the praise from the research community. Calendar year (CY) 2015 was filled with outstanding operational results and accomplishments: a very high rating from users on overall satisfaction that ties the highest-ever mark set in CY 2014; the greatestmore » number of core-hours delivered to research projects; the largest percentage of capability usage since the OLCF began tracking the metric in 2009; and success in delivering on the allocation of 60, 30, and 10% of core hours offered for the INCITE (Innovative and Novel Computational Impact on Theory and Experiment), ALCC (Advanced Scientific Computing Research Leadership Computing Challenge), and Director’s Discretionary programs, respectively. These accomplishments, coupled with the extremely high utilization rate, represent the fulfillment of the promise of Titan: maximum use by maximum-size simulations. The impact of all of these successes and more is reflected in the accomplishments of OLCF users, with publications this year in notable journals Nature, Nature Materials, Nature Chemistry, Nature Physics, Nature Climate Change, ACS Nano, Journal of the American Chemical Society, and Physical Review Letters, as well as many others. The achievements included in the 2015 OLCF Operational Assessment Report reflect first-ever or largest simulations in their communities; for example Titan enabled engineers in Los Angeles and the surrounding region to design and begin building improved critical infrastructure by enabling the highest-resolution Cybershake map for

  8. Expert Systems for United States Navy Shore Facilities Utility Operations.

    DTIC Science & Technology

    1988-03-01

    of expertise when assessing the applicability of an expert system. Each of the tasks as similarly ranked to reflect subjective judgement on the...United States Navy Shore Facilities Utility Operations ABSTRACT A technology assessment of expert systems as they might be used in Navy utility...of these applications include design, fault diagnoses, training, data base management, and real-time monitoring. An assessment is given of each

  9. Facility Will Help Transition Models Into Operations

    NASA Astrophysics Data System (ADS)

    Kumar, Mohi

    2009-02-01

    The U.S. National Oceanic and Atmospheric Administration's Space Weather Prediction Center (NOAA SWPC), in partnership with the U.S. Air Force Weather Agency (AFWA), is establishing a center to promote and facilitate the transition of space weather models to operations. The new facility, called the Developmental Testbed Center (DTC), will take models used by researchers and rigorously test them to see if they can withstand continued use as viable warning systems. If a model used in a space weather warning system crashes or fails to perform well, severe consequences can result. These include increased radiation risks to astronauts and people traveling on high-altitude flights, national security vulnerabilities from the loss of military satellite communications, and the cost of replacing damaged military and commercial spacecraft.

  10. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  11. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of constructionmore » and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic

  12. Commercial space and launch insurance : current market and future outlook : fourth quarter 2002 Quarterly Launch Report

    DOT National Transportation Integrated Search

    2002-01-01

    Since the last review of the space and launch insurance industry (see "Update of the Space and Launch Insurance Industry," 4th quarter, : 1998 Quarterly Launch Report), many changes have occurred in the market. This report endeavors to examine the cu...

  13. 76 FR 44614 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section... authority to issue and make immediately effective any amendment to an operating license upon a determination... electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site http://www...

  14. Electric power quarterly, July-September 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-02-04

    The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Form 423 are presented on a plant-by-plant basis. The EPQ presents a quarterly summary of disturbances andmore » unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on Form IE-417.« less

  15. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With certain exceptions, the Randolph-Sheppard Act (20 U.S.C. 107 et seq.) requires that blind persons licensed...

  16. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With certain exceptions, the Randolph-Sheppard Act (20 U.S.C. 107 et seq.) requires that blind persons licensed...

  17. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With certain exceptions, the Randolph-Sheppard Act (20 U.S.C. 107 et seq.) requires that blind persons licensed...

  18. 41 CFR 102-74.50 - Are Federal agencies required to give blind vendors priority in operating vending facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With certain exceptions, the Randolph-Sheppard Act (20 U.S.C. 107 et seq.) requires that blind persons licensed...

  19. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed

  20. Hawaiian Volcano Observatory 1960 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  1. Hawaiian Volcano Observatory 1959 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  2. Hawaiian Volcano Observatory 1971 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  3. Hawaiian Volcano Observatory 1961 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  4. Hawaiian Volcano Observatory 1958 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1962 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1970 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1973 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1966 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1965 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1964 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. Hawaiian Volcano Observatory 1957 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  12. Hawaiian Volcano Observatory 1972 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  13. Hawaiian Volcano Observatory 1969 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  14. Hawaiian Volcano Observatory 1967 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  15. Hawaiian Volcano Observatory 1968 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  16. Hawaiian Volcano Observatory 1963 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  17. FACILITY 89. INTERIOR OF MASTER BEDROOM, AS SEEN FROM DOORWAY. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF MASTER BEDROOM, AS SEEN FROM DOORWAY. VIEW FACING NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  18. FACILITY 89. INTERIOR OF LIVING ROOM, TAKEN THROUGH BEVELED OPENING. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF LIVING ROOM, TAKEN THROUGH BEVELED OPENING. VIEW FACING NORTH. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  19. The insertion device magnetic measurement facility: Prototype and operational procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burkel, L.; Dejus, R.; Maines, J.

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypesmore » as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications.« less

  20. Electric Power Quarterly, July-September 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-01-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  1. Electric Power Quarterly, October-December 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-04-01

    The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  2. Results for the first quarter calendar year 2017 tank 50H salt solution sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C. L.

    2017-04-12

    In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pumpmore » shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY17 sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan (TTQAP). This memorandum is part of Deliverable 2 from SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50H saltstone task.« less

  3. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    NASA Astrophysics Data System (ADS)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  4. Airborne cow allergen, ammonia and particulate matter at homes vary with distance to industrial scale dairy operations: an exposure assessment

    PubMed Central

    2011-01-01

    Background Community exposures to environmental contaminants from industrial scale dairy operations are poorly understood. The purpose of this study was to evaluate the impact of dairy operations on nearby communities by assessing airborne contaminants (particulate matter, ammonia, and cow allergen, Bos d 2) associated with dairy operations inside and outside homes. Methods The study was conducted in 40 homes in the Yakima Valley, Washington State where over 61 dairies operate. Results A concentration gradient was observed showing that airborne contaminants are significantly greater at homes within one-quarter mile (0.4 km) of dairy facilities, outdoor Bos d 2, ammonia, and TD were 60, eight, and two times higher as compared to homes greater than three miles (4.8 km) away. In addition median indoor airborne Bos d 2 and ammonia concentrations were approximately 10 and two times higher in homes within one-quarter mile (0.4 km) compared to homes greater than three miles (4.8 km) away. Conclusions These findings demonstrate that dairy operations increase community exposures to agents with known human health effects. This study also provides evidence that airborne biological contaminants (i.e. cow allergen) associated with airborne particulate matter are statistically elevated at distances up to three miles (4.8 km) from dairy operations. PMID:21838896

  5. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural

  6. 75 FR 68629 - Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-020; NRC-2010-0313] Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating; License No. R-37 The U.S. Nuclear... Institute of Technology (the licensee), which authorizes continued operation of the Massachusetts Institute...

  7. 40 CFR 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (c) Each chief facility operator and shift supervisor must take one of three actions: (1) Obtain a... in your State. (2) Schedule a full certification exam with the American Society of Mechanical Engineers (QRO-1-1994) (incorporated by reference in § 60.17(h)(1)). (3) Schedule a full certification exam...

  8. 40 CFR 60.1675 - What types of operator certification must the chief facility operator and shift supervisor obtain...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... after they are hired to work at the municipal waste combustion unit. (c) Each chief facility operator... certification exam with the American Society of Mechanical Engineers (QRO-1-1994) (incorporated by reference in § 60.17(h)(1)). (3) Schedule a full certification exam with your State certification program. (d) The...

  9. 78 FR 59093 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2013 rail cost adjustment factor (RCAF) and cost index filed by the Association of American Railroads. The fourth quarter 2013 RCAF...

  10. Management aspects of Gemini's base facility operations project

    NASA Astrophysics Data System (ADS)

    Arriagada, Gustavo; Nitta, Atsuko; Adamson, A. J.; Nunez, Arturo; Serio, Andrew; Cordova, Martin

    2016-08-01

    Gemini's Base Facilities Operations (BFO) Project provided the capabilities to perform routine nighttime operations without anyone on the summit. The expected benefits were to achieve money savings and to become an enabler of the future development of remote operations. The project was executed using a tailored version of Prince2 project management methodology. It was schedule driven and managing it demanded flexibility and creativity to produce what was needed, taking into consideration all the constraints present at the time: Time available to implement BFO at Gemini North (GN), two years. The project had to be done in a matrix resources environment. There were only three resources assigned exclusively to BFO. The implementation of new capabilities had to be done without disrupting operations. And we needed to succeed, introducing the new operational model that implied Telescope and instrumentation Operators (Science Operations Specialists - SOS) relying on technology to assess summit conditions. To meet schedule we created a large number of concurrent smaller projects called Work Packages (WP). To be reassured that we would successfully implement BFO, we initially spent a good portion of time and effort, collecting and learning about user's needs. This was done through close interaction with SOSs, Observers, Engineers and Technicians. Once we had a clear understanding of the requirements, we took the approach of implementing the "bare minimum" necessary technology that would meet them and that would be maintainable in the long term. Another key element was the introduction of the "gradual descent" concept. In this, we increasingly provided tools to the SOSs and Observers to prevent them from going outside the control room during nighttime operations, giving them the opportunity of familiarizing themselves with the new tools over a time span of several months. Also, by using these tools at an early stage, Engineers and Technicians had more time for debugging

  11. 5 CFR 332.311 - Quarterly examinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Quarterly examinations. 332.311 Section... AND SELECTION THROUGH COMPETITIVE EXAMINATION Period of Competition and Eligibility Acceptance of Applications After Closing Date of Examinations § 332.311 Quarterly examinations. (a) A 10-point preference...

  12. Electric Power Quarterly, January-March 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-07-21

    The ''Electric Power Quarterly (EPQ)'' provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The ''EPQ'' contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  13. FACILITY 1042. FRONT OBLIQUE SHOWING ROYAL PALMS LINING FRONT WALK. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 1042. FRONT OBLIQUE SHOWING ROYAL PALMS LINING FRONT WALK. VIEW FACING SOUTHEAST - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Junior Officers' Quarters Type, 9-10 Hale Alii Avenue, 1-2 Eighth Street, Pearl City, Honolulu County, HI

  14. Operating capability and current status of the reactivated NASA Lewis Research Center Hypersonic Tunnel Facility

    NASA Technical Reports Server (NTRS)

    Thomas, Scott R.; Trefny, Charles J.; Pack, William D.

    1995-01-01

    The NASA Lewis Research Center's Hypersonic Tunnel Facility (HTF) is a free-jet, blowdown propulsion test facility that can simulate up to Mach-7 flight conditions with true air composition. Mach-5, -6, and -7 nozzles, each with a 42 inch exit diameter, are available. Previously obtained calibration data indicate that the test flow uniformity of the HTF is good. The facility, without modifications, can accommodate models approximately 10 feet long. The test gas is heated using a graphite core induction heater that generates a nonvitiated flow. The combination of clean-air, large-scale, and Mach-7 capabilities is unique to the HTF and enables an accurate propulsion performance determination. The reactivation of the HTF, in progress since 1990, includes refurbishing the graphite heater, the steam generation plant, the gaseous oxygen system, and all control systems. All systems were checked out and recertified, and environmental systems were upgraded to meet current standards. The data systems were also upgraded to current standards and a communication link with NASA-wide computers was added. In May 1994, the reactivation was complete, and an integrated systems test was conducted to verify facility operability. This paper describes the reactivation, the facility status, the operating capabilities, and specific applications of the HTF.

  15. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... Docket ID NRC-2012-0283. You may submit comments by the following methods: Federal rulemaking Web site...

  16. 77 FR 35069 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... ID NRC-2012-0131. You may submit comments by the following methods: Federal Rulemaking Web site: Go...

  17. 40 CFR 125.137 - As an owner or operator of a new offshore oil and gas extraction facility, must I perform...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... offshore oil and gas extraction facility, must I perform monitoring? 125.137 Section 125.137 Protection of... operator of a new offshore oil and gas extraction facility, must I perform monitoring? As an owner or operator of a new offshore oil and gas extraction facility, you will be required to perform monitoring to...

  18. 40 CFR 125.137 - As an owner or operator of a new offshore oil and gas extraction facility, must I perform...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... offshore oil and gas extraction facility, must I perform monitoring? 125.137 Section 125.137 Protection of... operator of a new offshore oil and gas extraction facility, must I perform monitoring? As an owner or operator of a new offshore oil and gas extraction facility, you will be required to perform monitoring to...

  19. 40 CFR 125.137 - As an owner or operator of a new offshore oil and gas extraction facility, must I perform...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... offshore oil and gas extraction facility, must I perform monitoring? 125.137 Section 125.137 Protection of... operator of a new offshore oil and gas extraction facility, must I perform monitoring? As an owner or operator of a new offshore oil and gas extraction facility, you will be required to perform monitoring to...

  20. 40 CFR 125.137 - As an owner or operator of a new offshore oil and gas extraction facility, must I perform...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... offshore oil and gas extraction facility, must I perform monitoring? 125.137 Section 125.137 Protection of... operator of a new offshore oil and gas extraction facility, must I perform monitoring? As an owner or operator of a new offshore oil and gas extraction facility, you will be required to perform monitoring to...

  1. Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume IV of IV; Washington: Rocky Reach Hatchery Addendum, 1992 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, Larry

    1993-08-01

    Rocky Reach Hatchery is located along the Columbia Paver, just downstream from Rocky Reach Dam. Site elevation is 800 feet above sea level. The Turtle Rock Island facility, located 2 miles upstream, is operated as a satellite facility (shared with the Washington Department of Wildlife). The facility is staffed with 2.75 FTE`S. The hatchery was originally designed as a mile-long spawning channel at Turtle Rock Island. Rearing units consist of eight vinyl raceways at Rocky Reach and four rearing ponds at Turtle Rock. Water rights are held by Chelan County PUD and total 3,613 gpm from the Columbia River. Watermore » available for use in the Turtle Rock rearing ponds averages 12,000 gpm from the Columbia River. Rocky Reach Hatchery and the Turtle Rock satellite facility are owned by Chelan County PUD. They are operated as mitigation facilities for the fishery impacts caused by the construction and operation of Rocky Reach Dam. Rocky Reach Hatchery is used for incubation and early rearing of upriver bright (URB) fall chinook. Fingerlings are later transferred to the Turtle Rock facility for final rearing and release.« less

  2. West Hackberry Tertiary Project. Quarterly technical progress report, July 1--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project will demonstrate that the usemore » of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presented uneconomic. During this quarter, the West Hackberry Tertiary Project completed the first ten months of air injection operations. Plots of air injection rates and cumulative air injected are included in this report as attachments. The following events are reviewed in this quarter`s technical progress report: (1) successful workovers on the Gulf Land D Nos. 44, 45 and 51 and the Watkins No. 3; (2) the unsuccessful repair attempt on the Watkins No. 16; (3) gathering of additional bottom hole pressure data; (4) air compressor operations and repairs; and (5) technology transfer activities.« less

  3. Testing and checkout experiences in the National Transonic Facility since becoming operational

    NASA Technical Reports Server (NTRS)

    Bruce, W. E., Jr.; Gloss, B. B.; Mckinney, L. W.

    1988-01-01

    The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

  4. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Degraff, Brian D.; Howell, Matthew P.; Kim, Sang-Ho

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinneymore » pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.« less

  5. Electric Power Quarterly, January-March 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-07-01

    The Electric Power Quarterly (EPQ), a new series in the EIA statistical publications, provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. The data presented in this report were collected and published by the EIA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (P.L. 93-275). This edition of the EPQ contains monthly data for the first quarter of 1983. In this report, data collected on Form EIA-759 regarding electricmore » utilities' net generation, fuel consumption, and fuel stocks are presented for the first time on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.« less

  6. Natural gas imports and exports. Second quarter report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-31

    The Office of Natural Gas and Petroleum Import and Export Activities prepares quarterly reports summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports. This report is for the second quarter of 1997 (April through June).

  7. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility as well as each non-public utility with more than a de minimis market presence shall file an updated Electric Quarterly Report with the...

  8. 18 CFR 35.10b - Electric Quarterly Reports.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility as well as each non-public utility with more than a de minimis market presence shall file an updated Electric Quarterly Report with the...

  9. LOOKING ALONG HALE ALII AVENUE TOWARD SHIPYARD AREA. FACILITIES 1040 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOOKING ALONG HALE ALII AVENUE TOWARD SHIPYARD AREA. FACILITIES 1040 AND 1041 (QUARTERS 1 AND J) AT LEFT. VIEW FACING SOUTHWEST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Hale Alii, Hale Alii Avenue, Eighth Street, & Avenue D, Pearl City, Honolulu County, HI

  10. A Brief Study of Cafeteria Facilities and Operations, with Recommendations for Implementation.

    ERIC Educational Resources Information Center

    Okamura, James T.

    The facilities and operations of the school lunch program in the public schools of Hawaii are reviewed. Several types of school lunch programs are described including--(1) traditional school lunch programs, (2) kitchen and classroom dining, (3) central and decentralized dining, (4) home school-feeder school system, (5) central kitchen, and (6) the…

  11. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  12. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  13. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  14. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  15. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  16. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  17. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  18. 40 CFR 75.64 - Quarterly reports.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... placed in long-term cold storage (as defined in § 72.2 of this chapter), quarterly reports are not... the unit). For units placed into long-term cold storage during a reporting quarter, the exemption from... long-term cold storage. For any provisionally-certified monitoring system, § 75.20(a)(3) shall apply...

  19. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, July 1, 1995--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-01

    This report is the quarterly progress report for July through September 1995 for work done by Tulane and Xavier Universities under DOE contract number DE-FG01-93-EW53023. Accomplishments for various tasks including administrative activities, collaborative cluster projects, education projects, initiation projects, coordinated instrumentation facility, and an investigators` retreat are detailed in the report.

  20. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize itsmore » revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  1. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices whichmore » maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  2. FACILITY 89. INTERIOR OF ENTRY AND STAIR, WITH DINING ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF ENTRY AND STAIR, WITH DINING ROOM TO LEFT, AS SEEN FROM LIVING ROOM. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  3. FACILITY 89. INTERIOR OF SECONDFLOOR HALLWAY, AS SEEN FROM MASTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 89. INTERIOR OF SECOND-FLOOR HALLWAY, AS SEEN FROM MASTER BEDROOM. CLOSET OVER STAIRWAY AT LEFT. VIEW FACING SOUTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Junior Officers' Quarters Type K, Makin Place, & Halawa, Makalapa, & Midway Drives, Pearl City, Honolulu County, HI

  4. Skylab (SL)-3 Crewmen - Checklist - Crew Quarters - Orbital Workshop Simulator (OWS) Trainer - JSC

    NASA Image and Video Library

    1973-01-01

    S73-28793 (16 July 1973) --- The three crewmen of the second manned Skylab mission (Skylab 3) go over a checklist during preflight training at the Johnson Space Center. They are, left to right, scientist-astronaut Owen K. Garriott, science pilot; astronaut Alan L. Bean, commander; and astronaut Jack R. Lousma, pilot. They are in the crew quarters of the Orbital Workshop trainer in the Mission Training and Simulation Facility, Building 5, at JSC. Skylab 3 is scheduled as a 59-day mission in Earth orbit. Photo credit: NASA

  5. Flight dynamics facility operational orbit determination support for the ocean topography experiment

    NASA Technical Reports Server (NTRS)

    Bolvin, D. T.; Schanzle, A. F.; Samii, M. V.; Doll, C. E.

    1991-01-01

    The Ocean Topography Experiment (TOPEX/POSEIDON) mission is designed to determine the topography of the Earth's sea surface across a 3 yr period, beginning with launch in June 1992. The Goddard Space Flight Center Dynamics Facility has the capability to operationally receive and process Tracking and Data Relay Satellite System (TDRSS) tracking data. Because these data will be used to support orbit determination (OD) aspects of the TOPEX mission, the Dynamics Facility was designated to perform TOPEX operational OD. The scientific data require stringent OD accuracy in navigating the TOPEX spacecraft. The OD accuracy requirements fall into two categories: (1) on orbit free flight; and (2) maneuver. The maneuver OD accuracy requirements are of two types; premaneuver planning and postmaneuver evaluation. Analysis using the Orbit Determination Error Analysis System (ODEAS) covariance software has shown that, during the first postlaunch mission phase of the TOPEX mission, some postmaneuver evaluation OD accuracy requirements cannot be met. ODEAS results also show that the most difficult requirements to meet are those that determine the change in the components of velocity for postmaneuver evaluation.

  6. MagLev Cobra: Test Facilities and Operational Experiments

    NASA Astrophysics Data System (ADS)

    Sotelo, G. G.; Dias, D. H. J. N.; de Oliveira, R. A. H.; Ferreira, A. C.; De Andrade, R., Jr.; Stephan, R. M.

    2014-05-01

    The superconducting MagLev technology for transportation systems is becoming mature due to the research and developing effort of recent years. The Brazilian project, named MagLev-Cobra, started in 1998. It has the goal of developing a superconducting levitation vehicle for urban areas. The adopted levitation technology is based on the diamagnetic and the flux pinning properties of YBa2Cu3O7-δ (YBCO) bulk blocks in the interaction with Nd-Fe-B permanent magnets. A laboratory test facility with permanent magnet guideway, linear induction motor and one vehicle module is been built to investigate its operation. The MagLev-Cobra project state of the art is presented in the present paper, describing some construction details of the new test line with 200 m.

  7. Estimation of optimal biomass fraction measuring cycle formunicipal solid waste incineration facilities in Korea.

    PubMed

    Kang, Seongmin; Cha, Jae Hyung; Hong, Yoon-Jung; Lee, Daekyeom; Kim, Ki-Hyun; Jeon, Eui-Chan

    2018-01-01

    This study estimates the optimum sampling cycle using a statistical method for biomass fraction. More than ten samples were collected from each of the three municipal solid waste (MSW) facilities between June 2013 and March 2015 and the biomass fraction was analyzed. The analysis data were grouped into monthly, quarterly, semi-annual, and annual intervals and the optimum sampling cycle for the detection of the biomass fraction was estimated. Biomass fraction data did not show a normal distribution. Therefore, the non-parametric Kruskal-Wallis test was applied to compare the average values for each sample group. The Kruskal-Wallis test results showed that the average monthly, quarterly, semi-annual, and annual values for all three MSW incineration facilities were equal. Therefore, the biomass fraction at the MSW incineration facilities should be calculated on a yearly cycle which is the longest period of the temporal cycles tested. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. 10 CFR 60.132 - Additional design criteria for surface facilities in the geologic repository operations area.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... geologic repository operations area. 60.132 Section 60.132 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Technical Criteria Design Criteria for the Geologic Repository Operations Area § 60.132 Additional design criteria for surface facilities in...

  9. United States housing, third quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    The U.S. housing construction market’s third quarter was subdued, as all sectors moderated or declined. Once again, consensus expectations were for aggregate housing market gains, and these expectations were not realized. Overall starts, housing under construction, and completion data indicated quarterly improvement. Viewed from a recent his¬torical context, all...

  10. 2. View to northeast showing quarters and outbuildings, L to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. View to northeast showing quarters and outbuildings, L to R: Service Building (HABS No. VA-1287-D), Medical Officer's Quarters C (in background), Garage (HABS No. VA-1287-F), and Medical Officer's Quarters B - Portsmouth Naval Hospital, Medical Officer's Quarters C, West side Williamson Drive, 400 feet South of Rixey Drive, Portsmouth, Portsmouth, VA

  11. 77 FR 51705 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY...: FMCSA withdraws its June 27, 2012, direct final rule eliminating the quarterly financial reporting... future proposing the elimination of the quarterly financial reporting requirements for Form QFR and Form...

  12. Environmental surveillance data report for the second quarter of 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldberg, P.Y.; Horwedel, B.M.; Osborne-Lee, A.E.

    1991-02-01

    Each section of this report consists of a program description; results for the quarter; and an analysis of trends over the previous two years, depending upon the availability of data. Emissions of tritium to the atmosphere returned to levels consistent with the latter part of 1989. Osmium-191 releases were down by a factor of fifty due to changes in operations. Ambient air sampling around ORNL and the reservation showed that I-131 and H-3 continue to be at concentrations of less than 0.01% of the derived concentration guides (DCG) for these isotopes. Tritium and strontium concentrations at White Oak Dam weremore » at 11% and 22% of their DCGs for the quarter respectively. All of the other radionuclides that were evaluated at the dam were at 2% or less of their DCGs. The NPDES compliance ratio for this quarter was 97% due to 20 noncompliances. Twelve of the exceedences were due to Category outfalls. Total radioactive strontium in milk was detected at two of the stations. The concentrations were less than 1% of the DCG for Sr-90. Samples from the perimeter wells of SWSA 6 were consistent with the data collected during the assessment phase with the exception of one well that showed twice the concentration of tritium previously seen (920 Bq/L versus 530 Bq/L). 20 figs., 39 tabs.« less

  13. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobson, D; Churby, A; Krieger, E

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less

  14. Facility-level outcome performance measures for nursing homes.

    PubMed

    Porell, F; Caro, F G

    1998-12-01

    Risk-adjusted nursing home performance scores were developed for four health outcomes and five quality indicators from resident-level longitudinal case-mix reimbursement data for Medicaid residents of more than 500 nursing homes in Massachusetts. Facility performance was measured by comparing actual resident outcomes with expected outcomes derived from quarterly predictions of resident-level econometric models over a 3-year period (1991-1994). Performance measures were tightly distributed among facilities in the state. The intercorrelations among the nine outcome performance measures were relatively low and not uniformly positive. Performance measures were not highly associated with various structural facility attributes. For most outcomes, longitudinal analyses revealed only modest correlations between a facility's performance score from one time period to the next. Relatively few facilities exhibited consistent superior or inferior performance over time. The findings have implications toward the practical use of facility outcome performance measures for quality assurance and reimbursement purposes in the near future.

  15. Solar and Heliospheric Observatory (SOHO) Experimenters' Operations Facility (EOF)

    NASA Technical Reports Server (NTRS)

    Larduinat, Eliane; Potter, William

    1994-01-01

    This paper describes the SOHO Instrumenters' Operations Facility (EOF) project. The EOF is the element of the SOHO ground system at the Goddard Space Flight Center that provides the interface between the SOHO scientists and the other ground system elements. This paper first describes the development context of the SOHO EOF. It provides an overview of the SOHO mission within the International Solar-Terrestrial Physics (ISTP) project, and discusses the SOHO scientific objectives. The second part of this paper presents the implementation of the SOHO EOF, its innovative features, its possible applications to other missions, and its potential for use as part of a fully integrated ground control system.

  16. United States housing, second quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    The U.S. housing market’s quarter two results were disap¬pointing compared with the first quarter. Although overall expected gains did not materialize, certain sectors improved slightly. Housing under construction, completions, and new and existing home sales exhibited slight increases. Overall permit data declined, and the decrease in starts was due primarily to a...

  17. United States housing, fourth quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarter’s end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...

  18. 1. CARRIAGE HOUSE (left) AND SLAVE QUARTERS, SOUTH FRONT. A ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CARRIAGE HOUSE (left) AND SLAVE QUARTERS, SOUTH FRONT. A kitchen was included in the quarters. - Charles Fraser House, Carriage House & Slave Quarters, 55 King Street, Charleston, Charleston County, SC

  19. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2008

    DOT National Transportation Integrated Search

    2008-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  20. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2013

    DOT National Transportation Integrated Search

    2013-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  1. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2013

    DOT National Transportation Integrated Search

    2013-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  2. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2009

    DOT National Transportation Integrated Search

    2009-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  3. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2008

    DOT National Transportation Integrated Search

    2008-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  4. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2010

    DOT National Transportation Integrated Search

    2010-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  5. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2009

    DOT National Transportation Integrated Search

    2009-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  6. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2011

    DOT National Transportation Integrated Search

    2011-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  7. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : third quarter : [2011

    DOT National Transportation Integrated Search

    2011-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  8. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2014

    DOT National Transportation Integrated Search

    2014-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  9. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2012

    DOT National Transportation Integrated Search

    2012-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  10. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2012

    DOT National Transportation Integrated Search

    2012-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  11. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2010

    DOT National Transportation Integrated Search

    2010-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  12. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : third quarter : [2009

    DOT National Transportation Integrated Search

    2009-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  13. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2011

    DOT National Transportation Integrated Search

    2011-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  14. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2013

    DOT National Transportation Integrated Search

    2013-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  15. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2011

    DOT National Transportation Integrated Search

    2011-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  16. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : third quarter : [2010

    DOT National Transportation Integrated Search

    2010-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  17. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : first quarter : [2010

    DOT National Transportation Integrated Search

    2010-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  18. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : third quarter : [2013

    DOT National Transportation Integrated Search

    2013-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  19. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : fourth quarter : [2012

    DOT National Transportation Integrated Search

    2012-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  20. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : second quarter : [2009

    DOT National Transportation Integrated Search

    2009-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  1. Data Bank 1B - Ticket Dollar Value Origin and Destination - Public Version : third quarter : [2012

    DOT National Transportation Integrated Search

    2012-01-01

    This CD presents the same data as Data Bank 1B and also includes dual codes for the operating and ticketed carrier and incorporates data as reported each quarter by participating air carriers from the continuous 10% sample of airline tickets. It incl...

  2. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of the... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a...

  3. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of the... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a...

  4. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of the... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a...

  5. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of the... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management § 395.30 The location and operation of vending facilities for blind vendors on Federal property. (a...

  6. 10 CFR 2.103 - Action on applications for byproduct, source, special nuclear material, facility and operator...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...

  7. 10 CFR 2.103 - Action on applications for byproduct, source, special nuclear material, facility and operator...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...

  8. AMS data production facilities at science operations center at CERN

    NASA Astrophysics Data System (ADS)

    Choutko, V.; Egorov, A.; Eline, A.; Shan, B.

    2017-10-01

    The Alpha Magnetic Spectrometer (AMS) is a high energy physics experiment on the board of the International Space Station (ISS). This paper presents the hardware and software facilities of Science Operation Center (SOC) at CERN. Data Production is built around production server - a scalable distributed service which links together a set of different programming modules for science data transformation and reconstruction. The server has the capacity to manage 1000 paralleled job producers, i.e. up to 32K logical processors. Monitoring and management tool with Production GUI is also described.

  9. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  10. Electric Power Quarterly, October-December 1985. [Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-05-05

    The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. Data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.

  11. Viability of bovine demi- and quarter-embryos after transfer.

    PubMed

    Bredbacka, P; Huhtinen, M; Aalto, J; Rainio, V

    1992-07-01

    The viability of bovine demi- and quarter-embryos was investigated. Early compacting morulae were nonsurgically flushed from superovulated donor cows and were bisected by two microneedles. One of the halves was then split further into two quarters. Each demi- and quarter-embryo was placed in an evacuated zona pellucida. One demi- or two quarter-embryos were transferred non-surgically into cow or heifer recipients. Viability was measured by ultrasound scanning of the fetuses on Days 35, 48 and 60 of pregnancy. The pregnancy rates at Day 60 were 46.2% (6/13) for heifers and 33.3% (4/12) for cows after the transfer of a single demi-embryo. The transfer of two quarter-embryos resulted in a pregnancy rate of 61.5% (8/13) for heifers and 8.3% (1/12) for cows. Seven (53.8%) and four (33.3%) live fetuses were found on Day 60 following the transfer of demi-embryos into heifers and cows, respectively. The transfer of quarter-embryos resulted in 10 fetuses (38.5%) in the heifer recipients and only one fetus (4.2%) in the cow recipients. The results of this study suggest that heifers are more suitable than cows as recipients for quarter-embryos.

  12. 34 CFR 395.30 - The location and operation of vending facilities for blind vendors on Federal property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER PROPERTY Federal Property Management... 34 Education 2 2011-07-01 2010-07-01 true The location and operation of vending facilities for blind vendors on Federal property. 395.30 Section 395.30 Education Regulations of the Offices of the...

  13. ARM Climate Research Facility Quarterly Value-Added Product Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sivaraman, C.

    The purpose of this report is to provide a concise status update for Value-Added Products (VAPs) implemented by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new VAPs for which development has begun; (2) progress on existing VAPs; (3) future VAPs that have been recently approved; (4) other work that leads to a VAP; (5) top requested VAPs from the ARM Data Archive; and (6) a summary of VAP and data releases to production and evaluation. New information is highlighted in blue text. New information about processed data by the developermore » is highlighted in red text. The upcoming milestones and dates are highlighted in green.« less

  14. Applied Meteorology Unit (AMU) Quarterly Report First Quarter FY-04

    NASA Technical Reports Server (NTRS)

    Bauman, William; Wheeler, Mark; Labert, Winifred; Jonathan Case; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the First Quarter of Fiscal Year 2004 (October - December 2003). Tasks reviewed are: (1) Objective Lightning Probability Forecast, (2) Mesonet Temperature and Wind Climatology, (3) Severe Weather Forecast Decision Aid and (4) Anvil Transparency Relationship to Radar Reflectivity

  15. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How must the facility operator measure the geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilizatio...

  16. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How must the facility operator measure the geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilizatio...

  17. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How must the facility operator measure the geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilizatio...

  18. 43 CFR 3275.13 - How must the facility operator measure the geothermal resources?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How must the facility operator measure the geothermal resources? 3275.13 Section 3275.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Conducting Utilizatio...

  19. 78 FR 66388 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0231] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... describes a different method for submitting comments on a specific subject): Federal Rulemaking Web site: Go...

  20. 30 CFR 250.256 - What related facilities and operations information must accompany the DPP or DOCD?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What related facilities and operations information must accompany the DPP or DOCD? 250.256 Section 250.256 Mineral Resources BUREAU OF OCEAN ENERGY... OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Contents of Development and Production Plans...

  1. Some boundary-value problems for anisotropic quarter plane

    NASA Astrophysics Data System (ADS)

    Arkhypenko, K. M.; Kryvyi, O. F.

    2018-04-01

    To solve the mixed boundary-value problems of the anisotropic elasticity for the anisotropic quarter plane, a method based on the use of the space of generalized functions {\\Im }{\\prime }({\\text{R}}+2) with slow growth properties was developed. The two-dimensional integral Fourier transform was used to construct the system of fundamental solutions for the anisotropic quarter plane in this space and a system of eight boundary integral relations was obtained, which allows one to reduce the mixed boundary-value problems for the anisotropic quarter plane directly to systems of singular integral equations with fixed singularities. The exact solutions of these systems were found by using the integral Mellin transform. The asymptotic behavior of solutions was investigated at the vertex of the quarter plane.

  2. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, 1991-93

    USGS Publications Warehouse

    Torikai, J.D.

    1995-01-01

    This report contains hydrologic and climatic data that describe the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data are presented from January 1991 through December 1993. This report concentrates on data from fourth quarter 1993, and references historic data from 1991 and 1992. Total rainfall for 1993 was 95 inches which is 10 percent below the mean annual rainfall of 106 inches. In comparison, total rainfalls in 1992 and 1991 were 93 inches and 130 inches, respectively. Ground-water withdrawal has averaged 954,000 gallons per day during 1993, while with- drawals in 1992 and 1991 averaged 936,000 gallons per day and 927,000 gallons per day, respectively. In each of the five areas of ground-water produc- tion, withdrawals have remained steady since 1991. At the end of December 1993, the chloride concen- tration of the composite water supply was 36 milligrams per liter, well below the 250 milligrams per liter secondary drinking water standard established by the U.S. Environmental Protection Agency. Chloride concentrations of the composite water supply during the last quarter (October through December 1993) ranged between 35 and 75 milligrams per liter. Chloride concentrations in monitoring wells at Cantonment and Air Operations decreased during the last quarter (October through December 1993) after having risen progressively during the previous quarter (July through September 1993). There has been a general trend of increasing chloride concentrations in the deeper monitoring wells since the 1992 dry season, which began in March 1992. A fuel spill at Air Operations caused the shutdown of ten wells in May 1991. Four of the wells resumed pumping for water supply purposes in April 1992. The remaining six wells are being used to hydraulically contain and divert fuel migration.

  3. Earth-based analogs of lunar and planetary facilities

    NASA Technical Reports Server (NTRS)

    Bell, Larry; Trotti, Guillermo

    1992-01-01

    Antarctica contains areas where the environment and terrain are more similar to regions on the Moon and Mars than any other place on Earth. These features offer opportunities for simulations to determine performance capabilities of people and machines in harsh, isolated locales. The Sasakawa International Center for Space Architecture (SICSA) plans to create a facility on Antarctica for research, planning, and demonstrations in support of planetary exploration. The Antarctic Planetary Testbed (APT) will be financed and utilized by public and private organizations throughout the world. Established on a continent owned by no country, it can serve as a model for cooperation between spacefaring nations. APT science and technology programs will expand knowledge about the nature and origin of our solar system, and will support preparations for human settlements beyond Earth that may occur within the first quarter of the next century. The initial APT facility, conceived to be operational by the year 1992, will be constructed during the summer months by a crew of approximately 12. Six to eight of these people will remain through the winter. As in space, structures and equipment systems will be modular to facilitate efficient transport to the site, assembly, and evolutionary expansion. State-of-the-art waste recovery/recycling systems are also emphasized due to their importance in space.

  4. 78 FR 78402 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0272] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...

  5. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-controlmore » and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.« less

  6. Defense Attache Saigon: RVNAF Quarterly Assessment, 1st Quarter FY75

    DTIC Science & Technology

    1974-11-01

    CONFIDENTIAL ___ has been realized and a new computation of requirements methodology has been developed. Improved repair capability at ATLC and the Air ... Asia Ccrtcactor (Taiwan) have also reduced the dollar value "of AIMI buy requirements from CONUS. Comparison of quarterly * requirements follows

  7. Improving INPE'S balloon ground facilities for operation of the protoMIRAX experiment

    NASA Astrophysics Data System (ADS)

    Mattiello-Francisco, F.; Rinke, E.; Fernandes, J. O.; Cardoso, L.; Cardoso, P.; Braga, J.

    2014-10-01

    The system requirements for reusing the scientific balloon ground facilities available at INPE were a challenge to the ground system engineers involved in the protoMIRAX X-ray astronomy experiment. A significant effort on software updating was required for the balloon ground station. Considering that protoMIRAX is a pathfinder for the MIRAX satellite mission, a ground infrastructure compatible with INPE's satellite operation approach would be useful and highly recommended to control and monitor the experiment during the balloon flights. This approach will make use of the SATellite Control System (SATCS), a software-based architecture developed at INPE for satellite commanding and monitoring. SATCS complies with particular operational requirements of different satellites by using several customized object-oriented software elements and frameworks. We present the ground solution designed for protoMIRAX operation, the Control and Reception System (CRS). A new server computer, properly configured with Ethernet, has extended the existing ground station facilities with switch, converters and new software (OPS/SERVER) in order to support the available uplink and downlink channels being mapped to TCP/IP gateways required by SATCS. Currently, the CRS development is customizing the SATCS for the kernel functions of protoMIRAX command and telemetry processing. Design-patterns, component-based libraries and metadata are widely used in the SATCS in order to extend the frameworks to address the Packet Utilization Standard (PUS) for ground-balloon communication, in compliance with the services provided by the data handling computer onboard the protoMIRAX balloon.

  8. High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baker, Ann E; Bland, Arthur S Buddy; Hack, James J

    Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor thatmore » uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where

  9. 1. GENERAL VIEW OF SLAVE QUARTERS No. 2 (right). Located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF SLAVE QUARTERS No. 2 (right). Located north of main house. The building at left is Slave Quarters No. 1 (HABS No. VA-1233 C) - Westend, Slave Quarters No. 2, Route 638 vicinity, Trevilians, Louisa County, VA

  10. Crew quarters for Space Station

    NASA Technical Reports Server (NTRS)

    Mount, F. E.

    1989-01-01

    The only long-term U.S. manned space mission completed has been Skylab, which has similarities as well as differences to the proposed Space Station. With the exception of Skylab missions, there has been a dearth of experience on which to base the design of the individual Space Station Freedom crew quarters. Shuttle missions commonly do not have sleep compartments, only 'sleeping arrangements'. There are provisions made for each crewmember to have a sleep restraint and a sleep liner, which are attached to a bulkhead or a locker. When the Shuttle flights began to have more than one working shift, crew quarters became necessary due to noise and other disturbances caused by crew task-related activities. Shuttle missions that have planned work shifts have incorporated sleep compartments. To assist in gaining more information and insight for the design of the crew quarters for the Space Station Freedom, a survey was given to current crewmembers with flight experience. The results from this survey were compiled and integrated with information from the literature covering space experience, privacy, and human-factors issues.

  11. Characterization of the radiation environment at the UNLV accelerator facility during operation of the Varian M6 linac

    NASA Astrophysics Data System (ADS)

    Hodges, M.; Barzilov, A.; Chen, Y.; Lowe, D.

    2016-10-01

    The bremsstrahlung photon flux from the UNLV particle accelerator (Varian M6 model) was determined using MCNP5 code for 3 MeV and 6 MeV incident electrons. Human biological equivalent dose rates due to accelerator operation were evaluated using the photon flux with the flux-to-dose conversion factors. Dose rates were computed for the accelerator facility for M6 linac use under different operating conditions. The results showed that the use of collimators and linac internal shielding significantly reduced the dose rates throughout the facility. It was shown that the walls of the facility, in addition to the earthen berm enveloping the building, provide equivalent shielding to reduce dose rates outside to below the 2 mrem/h limit.

  12. ER Consolidated Qtrly Rpt_April thru June 2015_October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, John

    2015-10-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit, and the Compliance Order on Consent. The 13 sites in the Corrective Action process are listed in Table I-1. Because the status of any Long-Term Stewardship (LTS) activity is detailed in other reports, Section I.3.0 (titled Long-Term Stewardship Work Completed) will not be presented in future ER Quarterly Reports. Section I.3.0 of this ER Quarterly Report identifies the other reports that detail LTS activities.

  13. Washington Community Colleges Fall Quarter Report, 1980.

    ERIC Educational Resources Information Center

    Story, Sherie; And Others

    This three-part report presents a series of 46 tables providing data about enrollments, student characteristics, and personnel in the Washington community college system for Fall Quarter 1980. After a summary of the statistical highlights of the study, Chapter I offers historical data on Fall Quarter, full-time equivalent (FTE) and student…

  14. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PRODUCTS INSPECTION ACT (CONTINUED) VOLUNTARY GRADING OF POULTRY PRODUCTS AND RABBIT PRODUCTS Grading of Poultry Products and Rabbit Products Sanitary Requirements, Facilities, and Operating Procedures § 70.110... in 9 CFR part 381 for poultry, and for rabbits the requirements shall be the applicable provisions...

  15. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PRODUCTS INSPECTION ACT (CONTINUED) VOLUNTARY GRADING OF POULTRY PRODUCTS AND RABBIT PRODUCTS Grading of Poultry Products and Rabbit Products Sanitary Requirements, Facilities, and Operating Procedures § 70.110... in 9 CFR part 381 for poultry, and for rabbits the requirements shall be the applicable provisions...

  16. 77 FR 39447 - Revisions to Electric Quarterly Report Filing Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... Quarterly Report Filing Process AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Notice of... Rule which governs the filing of Electric Quarterly Reports (EQRs), to change the process for filing... Regulatory Commission (Commission) proposes changes to the method for filing Electric Quarterly Reports (EQRs...

  17. The effect of motorcycle travel on the safety and operations of HOV facilities in Virginia.

    DOT National Transportation Integrated Search

    1995-01-01

    The Intermodal Surface Transportation Efficiency Act of 1991 mandated that motorcycles be permitted to travel on federally funded high-occupancy vehicle (HOV) facilities unless they created a safety hazard or adversely affected HOV operations. Althou...

  18. Evaluating the relative impacts of operational and financial factors on the competitiveness of an algal biofuel production facility.

    PubMed

    Hise, Adam M; Characklis, Gregory W; Kern, Jordan; Gerlach, Robin; Viamajala, Sridhar; Gardner, Robert D; Vadlamani, Agasteswar

    2016-11-01

    Algal biofuels are becoming more economically competitive due to technological advances and government subsidies offering tax benefits and lower cost financing. These factors are linked, however, as the value of technical advances is affected by modeling assumptions regarding the growth conditions, process design, and financing of the production facility into which novel techniques are incorporated. Two such techniques, related to algal growth and dewatering, are evaluated in representative operating and financing scenarios using an integrated techno-economic model. Results suggest that these techniques can be valuable under specified conditions, but also that investment subsidies influence cost competitive facility design by incentivizing development of more capital intensive facilities (e.g., favoring hydrothermal liquefaction over transesterification-based facilities). Evaluating novel techniques under a variety of operational and financial scenarios highlights the set of site-specific conditions in which technical advances are most valuable, while also demonstrating the influence of subsidies linked to capital intensity. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Modeling Natural Attenuation of an Industrial Facility in Houston

    NASA Astrophysics Data System (ADS)

    Sun, D.

    2016-12-01

    Groundwater monitoring is currently ongoing at a commercial/industrial facility located in Deer Park, Texas (the site). The subject site is an approximate 10 acre commercial/industrial facility that began operation in the late-1970s. Operations have historically consisted of vehicle maintenance services, administrative, and equipment storage. Assessment and groundwater monitoring activities have been conducted at the site to evaluate the magnitude and extent of groundwater affected with chlorinated volatile organic compounds (VOCs). Groundwater data has been collected at this site since the mid-2000s on a quarterly basis. Presently, VOC constituents tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (DCE), 1,1-dichloroethene (1,1-DCE), and vinyl chloride (VC) are the only chemicals of concern (COCs) detected at concentrations exceeding the TCEQ Actions Levels established by the state of Texas. The goal is that one day the site will receive a certificate of completion from the state, which states that all non-responsible parties are released from all liability to the state for cleanup. The remediation technology that is currently being used at this site is Monitoring Natural Attenuation (MNA). A significant question is whether MNA is efficiently removing COCs in groundwater and how long will this process take to achieve the remediation goals. The objective of this study is to provide an estimate of concentrations of COCs in groundwater at the site using the Biochlor model. The Biochlor model will help answer the question as to whether or not natural attenuation is occurring at the site efficiently. Results show that Monitored Natural Attenuation may not be the optimal remediation technology to use at this site. Other remedial technologies are needed to clean up chemical in the site. Groundwater monitoring is currently ongoing at a commercial/industrial facility located in Deer Park, Texas (the site). The subject site is an approximate 10 acre

  20. Fact Sheet: Control Techniques Guidelines (CTG) for Shipbuilding and Ship Repair Facilities Operation (Surface Coating)

    EPA Pesticide Factsheets

    This page contains an August 1996 fact sheet with information regarding the CTG and Alternative Control Techniques (ACT) for Surface Coating at Shipbuilding and Ship Repair Facilities Operations. This document provides a summary of this guidance

  1. The Langley thermal protection system test facility: A description including design operating boundaries

    NASA Technical Reports Server (NTRS)

    Klich, G. F.

    1976-01-01

    A description of the Langley thermal protection system test facility is presented. This facility was designed to provide realistic environments and times for testing thermal protection systems proposed for use on high speed vehicles such as the space shuttle. Products from the combustion of methane-air-oxygen mixtures, having a maximum total enthalpy of 10.3 MJ/kg, are used as a test medium. Test panels with maximum dimensions of 61 cm x 91.4 cm are mounted in the side wall of the test region. Static pressures in the test region can range from .005 to .1 atm and calculated equilibrium temperatures of test panels range from 700 K to 1700 K. Test times can be as long as 1800 sec. Some experimental data obtained while using combustion products of methane-air mixtures are compared with theory, and calibration of the facility is being continued to verify calculated values of parameters which are within the design operating boundaries.

  2. Trustee Quarterly, 1992.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1992

    1992-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1992 issue offers articles on the trustee's role in politics, community colleges as community catalysts, Lewis and Clark Community College's (Illinois) strategic planning process, staff development…

  3. Trustee Quarterly, 1995.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1995

    1995-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1995 issue offers these feature articles: "Trustees Believe Focus Should Be on Major Policy Decisions," (John F. Grabowski) and "A Cost-Benefit Analysis System for Proposed Capital…

  4. Trustee Quarterly, 1991.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1991

    1991-01-01

    These four issues of "Trustee Quarterly" focus on topics of current concern to community college trustees. The winter 1991 issue contains articles examining the trustee role in helping diverse students achieve, a reconceptualization of community college finance, the development of a statewide communications plan by the Washington trustees, an…

  5. FACILITY 72, INTERIOR. 15LIGHT DOUBLE DOORS WITH 15LIGHT SIDELIGHTS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FACILITY 72, INTERIOR. 15-LIGHT DOUBLE DOORS WITH 15-LIGHT SIDELIGHTS AND 2-LIGHT TRANSOM. LIVING ROOM BEYOND. VIEW FACING NORTH-NORTHEAST. - U.S. Naval Base, Pearl Harbor, Naval Housing Area Makalapa, Senior Officers' Quarters Type C, North end of Makalapa Drive, Pearl City, Honolulu County, HI

  6. Spiraling Light with Magnetic Metamaterial Quarter-Wave Turbines.

    PubMed

    Zeng, Jinwei; Luk, Ting S; Gao, Jie; Yang, Xiaodong

    2017-09-19

    Miniaturized quarter-wave plate devices empower spin to orbital angular momentum conversion and vector polarization formation, which serve as bridges connecting conventional optical beam and structured light. Enabling the manipulability of additional dimensions as the complex polarization and phase of light, quarter-wave plate devices are essential for exploring a plethora of applications based on orbital angular momentum or vector polarization, such as optical sensing, holography, and communication. Here we propose and demonstrate the magnetic metamaterial quarter-wave turbines at visible wavelength to produce radially and azimuthally polarized vector vortices from circularly polarized incident beam. The magnetic metamaterials function excellently as quarter-wave plates at single wavelength and maintain the quarter-wave phase retardation in broadband, while the turbine blades consist of multiple polar sections, each of which contains homogeneously oriented magnetic metamaterial gratings near azimuthal or radial directions to effectively convert circular polarization to linear polarization and induce phase shift under Pancharatnum-Berry's phase principle. The perspective concept of multiple polar sections of magnetic metamaterials can extend to other analogous designs in the strongly coupled nanostructures to accomplish many types of light phase-polarization manipulation and structured light conversion in the desired manner.

  7. Variations in hospitalization rates among nursing home residents: the role of facility and market attributes.

    PubMed

    Carter, Mary W; Porell, Frank W

    2003-04-01

    This study examined the contribution of facility-level and area market-level attributes to variations in hospitalization rates among nursing home residents. Three years (1991-1994) of state quarterly Medicaid case-mix reimbursement data from 527 nursing homes (NH) in Massachusetts were linked with Medicare Provider Analysis and Review hospital claims and nursing facility attribute data to produce a longitudinal, analytical file containing 72,319 person-quarter observations. Logistic regression models were used to estimate the influence of facility-level and market-level factors on hospital use, after controlling for individual-level resident attributes, including: NH diagnoses, resident-level quality of care indicators, and diagnostic cost grouping classification from previous hospital stays. Multivariate findings suggest that resident heterogeneity alone does not account for the wide variations in hospitalization rates across nursing homes. Instead, facility characteristics such as profit status, nurse staffing patterns, NH size, chain affiliation, and percentage of Medicaid and Medicare reimbursed days significantly influence NH residents' risk of hospitalization. Broader area market factors also appear to contribute to variations in hospitalization rates. Variations in hospitalization rates may reflect underutilization, as well as overutilization. Continued efforts toward identifying medically necessary hospitalizations are needed.

  8. 75 FR 51490 - Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ...). The proposed amendment would approve the cyber security plan and implementation schedule, and revise... maintain in effect all provisions of the NRC-approved cyber security plan. Basis for proposed no... [facility operating license] to implement and maintain a Cyber Security Plan as part of Energy Northwest's...

  9. First Quarter Hanford Seismic Report for Fiscal Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.

    2010-03-29

    The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b,more » 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite

  10. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  11. Skylab experimental performance evaluation manual. Appendix D: Experiment M487 habitability/crew quarters (MSFC)

    NASA Technical Reports Server (NTRS)

    Purushotham, K. S.

    1973-01-01

    This appendix contains a series of analyses for Experiment M487, Habitability/ Crew Quarters (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

  12. Establishing repeatable operation of a centrifugal compressor research facility for aerodynamic investigations

    NASA Astrophysics Data System (ADS)

    Dolan, Matthew Philip

    The objective of this research has been to analyze the steady state performance of a new centrifugal compressor research facility. The CSTAR (Centrifugal STage for Aerodynamic Research) compressor has been designed to be placed as the last stage in an axial compressor and its performance in this flow regime was measured. Because the compressor was designed as a research vehicle, unique instrumentation throughout the flow path provides a detailed look at its steady state performance. Rakes at the inlet and deswirl section quantify the overall performance but other instrumentation is used to understand the component performance. Static pressure taps along the shroud, within the diffuser, and through the turn-to-axial show the static pressure rise. Additionally, rakes at the inlet and exit of diffuser also characterize the performance of the wedge diffuser and the impeller. Additionally, capacitance probes located at the knee and exducer of the impeller non-intrusively measure the size of the tip clearance during facility operation. An investigation into these measurements resulted in a standard procedure for in-situ calibration and installation to produce repeatable and accurate clearance measurements. Finally, the feasibility of future Laser Doppler Velocimetry measurements acquired through the shroud window was tested and was found to be achievable with the use of beam translators to ensure that measurement volumes are created after beam refraction through the windows. Inlet conditions of the facility have been investigated and fluctuations of the ambient conditions have been mitigated with a large settling chamber to ensure repeatable and stable operation. The current instrumentation was utilized to determine the compressor performance. Measurements of the steady performance parameters along with those of the internal flowfield are documented.

  13. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    NASA Astrophysics Data System (ADS)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  14. Trustee Quarterly, 1993.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1993

    1993-01-01

    The four issues of "Trustee Quarterly" contained in this document focus on topics of current concern to community college trustees. The winter 1993 issue offers articles on the prospects for educational reform under the Clinton administration and the current Congress, strategies for obtaining needed resources from the state legislature, and the…

  15. Trustee Quarterly, 1997.

    ERIC Educational Resources Information Center

    Hutchins, Sally, Ed.

    1997-01-01

    These four issues of "Trustee Quarterly" focus on current topics affecting community college trustees. Issue 1 focuses on the learning revolution and serves as a guide for community college trustees. It offers the following feature articles by Terry O'Banion: "Education Reform: Two Waves,""The Second Wave and the Community…

  16. Trustee Quarterly, 1994.

    ERIC Educational Resources Information Center

    Trustee Quarterly, 1994

    1994-01-01

    The four issues of "Trustee Quarterly" combined here focus on topics of current concern to community college trustees. The winter 1994 issues offers these feature articles: "Honoring Retiring Presidents," by Terry O'Banion; "Trustees as Reluctant Leaders: The Board/CEO Relationship," Norma Jean Germond, John Keyser, and Vaughn A. Sherman; and…

  17. H-Area Seepage Basins groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    During fourth quarter 1992, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with South Carolina Hazardous Waste Management Regulations, R61-79.265, Subpart F. Samples were collected from 130 wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B Post-Closure Care Permit Application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control in December 1990. Historically, as well as currently, tritium, nitrate, total alpha-emittingmore » radium, gross alpha, and mercury have been the primary constituents observed above final Primary Drinking Water Standards (PDWS) in groundwater at the HASB. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during first and fourth quarter 1992. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.« less

  18. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ...; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0139. NRC...

  19. Physics and technology in the ion-cyclotron range of frequency on Tore Supra and TITAN test facility: implication for ITER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Litaudon, X; Bernard, J. M.; Colas, L.

    2013-01-01

    To support the design of an ITER ion-cyclotron range of frequency heating (ICRH) system and to mitigate risks of operation in ITER, CEA has initiated an ambitious Research & Development program accompanied by experiments on Tore Supra or test-bed facility together with a significant modelling effort. The paper summarizes the recent results in the following areas: Comprehensive characterization (experiments and modelling) of a new Faraday screen concept tested on the Tore Supra antenna. A new model is developed for calculating the ICRH sheath rectification at the antenna vicinity. The model is applied to calculate the local heat flux on Toremore » Supra and ITER ICRH antennas. Full-wave modelling of ITER ICRH heating and current drive scenarios with the EVE code. With 20 MW of power, a current of 400 kA could be driven on axis in the DT scenario. Comparison between DT and DT(3He) scenario is given for heating and current drive efficiencies. First operation of CW test-bed facility, TITAN, designed for ITER ICRH components testing and could host up to a quarter of an ITER antenna. R&D of high permittivity materials to improve load of test facilities to better simulate ITER plasma antenna loading conditions.« less

  20. 75 FR 17462 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... decision may be purchased by contacting the office of Public Assistance, Governmental Affairs, and...-2)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2010 Rail Cost...

  1. Wastewater Facilities Operation and Management. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Long, David A.

    Local communities must be willing to spend funds to assure the proper operation and management of wastewater treatment facilities. Designed for citizen advisory groups, the one-hour learning session described in this instructor's manual covers problem areas, federal requirements, and responsibilities for wastewater plant operations and management.…

  2. 40 CFR 124.206 - In what situations may I require a facility owner or operator to apply for an individual permit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... history of significant non-compliance with regulations or permit conditions. (3) The facility has a demonstrated history of submitting incomplete or deficient permit application information. (4) The facility has... standardized RCRA permit. (2) Circumstances have changed since the time the facility owner or operator applied...

  3. Suppression of multipacting in high power RF couplers operating with superconducting cavities

    NASA Astrophysics Data System (ADS)

    Ostroumov, P. N.; Kazakov, S.; Morris, D.; Larter, T.; Plastun, A. S.; Popielarski, J.; Wei, J.; Xu, T.

    2017-06-01

    Capacitive input couplers based on a 50 Ω coaxial transmission line are frequently used to transmit RF power to superconducting (SC) resonators operating in CW mode. It is well known that coaxial transmission lines are prone to multipacting phenomenon in a wide range of RF power level and operating frequency. The Facility for Rare Isotope Beams (FRIB) being constructed at Michigan State University includes two types of quarter wave SC resonators (QWR) operating at 80.5 MHz and two types of half wave SC resonators (HWR) operating at 322 MHz. As was reported in ref. [1] a capacitive input coupler used with HWRs was experiencing strong multipacting that resulted in a long conditioning time prior the cavity testing at design levels of accelerating fields. We have developed an insert into 50 Ω coaxial transmission line that provides opportunity to bias the RF coupler antenna and protect the amplifier from the bias potential in the case of breakdown in DC isolation. Two of such devices have been built and are currently used for the off-line testing of 8 HWRs installed in the cryomodule.

  4. Bulk shielding facility quarterly report, October, November, and December 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurt, III, S. S.; Lance, E. D.; Thomas, J. R.

    1977-08-01

    The BSR operated at an average power level of 1,836 kw for 78.01 percent of the time during October, November, and December. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The PCA was used in training programs and was operated on two occasions when the University of Kentucky students actively participated in training laboratories.

  5. Beyond Quarterly Earnings: Preparing the Business Community for Long-term Climate Risks

    NASA Astrophysics Data System (ADS)

    Carlson, C.; Goldman, G. T.

    2014-12-01

    The business community stands to be highly impacted by climate change. In both short and long-term timescales, climate change presents material and financial risks to companies in diverse economic sectors. How the private sector accounts for long-term risks while making short-term decisions about operations is a complex challenge. Companies are accountable to shareholders and must report performance to them on a quarterly basis. At the same time, company investors are exposed to long-term climate-related risks and face losses if companies fail to prepare for climate impacts. The US Securities and Exchange Commission (SEC) obligates publicly traded companies to discuss risks that might materially affect their business and since 2010, the agency recommends that companies consider and discuss any significant risks to their business from climate change. Some companies have complied with this guidance and comprehensively analyze potential climate change impacts, yet others fail to consider climate change at all. Such omissions leave companies without plans for addressing future risks and expose investors and the public to potential catastrophic events from climate change impacts. Climate risk projections can inform companies about the vulnerability of their facilities, supply chains, transportation pathways, and other assets. Such projections can help put climate-related risks in terms of material costs for companies and their investors. Focusing on the vulnerability of coastal facilities, we will use climate change impact projections to demonstrate the economic impacts of climate change faced by the private sector. These risks are then compared to company disclosures to the SEC to assess the degree to which companies have considered their vulnerability to climate change. Finally, we will discuss ways that companies can better assess and manage long-term climate risks.

  6. 76 FR 59483 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... the decision may be purchased by contacting the Office of Public Assistance, Governmental Affairs, and...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2011 Rail Cost Adjustment...

  7. 76 FR 64388 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses; Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0241] Biweekly Notice; Applications and Amendments to Facility Operating Licenses; Involving No Significant Hazards Considerations Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  8. 76 FR 76193 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0275] Applications and Amendments to Facility Operating.... You may submit comments by any one of the following methods: Federal Rulemaking Web Site: Go to http... Information Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the...

  9. 76 FR 55125 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0205] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing thi...

  10. 76 FR 9821 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0040] Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  11. 76 FR 4381 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0019] Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC) is publishing...

  12. Pathogen group specific risk factors for clinical mastitis, intramammary infection and blind quarters at the herd, cow and quarter level in smallholder dairy farms in Jimma, Ethiopia.

    PubMed

    Tolosa, T; Verbeke, J; Ayana, Z; Piepers, S; Supré, K; De Vliegher, S

    2015-07-01

    A cross-sectional study on clinical mastitis, intramammary infection (IMI) and blind quarters was conducted on 50 smallholder dairy farms in Jimma, Ethiopia. A questionnaire was performed, and quarters of 211 cows were sampled and bacteriologically cultured. Risk factors at the herd, cow, and quarter level for clinical mastitis and (pathogen-specific) intramammary infection were studied using multilevel modeling. As well, factors associated with quarters being blind were studied. Eleven percent of the cows and 4% of the quarters had clinical mastitis whereas 85% of the cows and 51% of the quarters were infected. Eighteen percent of the cows had one or more blind quarter(s), whereas 6% of the quarters was blind. Non-aureus staphylococci were the most frequently isolated pathogens in both clinical mastitis cases and IMI. The odds of clinical mastitis was lower in herds where heifers were purchased in the last year [odds ratio (OR) with 95% confidence interval: 0.11 (0.01-0.90)], old cows (>4 years) [OR: 0.45 (0.18-1.14)], and quarters not showing teat injury [OR: 0.23 (0.07-0.77)]. The odds of IMI caused by any pathogen was higher in herds not practicing teat drying before milking (opposed to drying teats with 1 towel per cow) [OR: 1.68 (1.05-2.69)], cows in later lactation (>180 DIM opposed to ≤90 DIM) [OR: 1.81 (1.14-2.88)], cows with a high (>3) body condition score (BCS) [OR: 1.57 (1.06-2.31)], right quarters (opposed to a left quarter position) [OR: 1.47 (1.10-1.98)], and quarters showing teat injury [OR: 2.30 (0.97-5.43)]. Quarters of cows in herds practicing bucket-fed calf feeding (opposed to suckling) had higher odds of IMI caused by Staphylococcus aureus [OR: 6.05 (1.31-27.90)]. Except for BCS, IMI caused by non-aureus staphylococci was associated with the same risk factors as IMI caused by any pathogen. No access to feed and water immediately after milking [OR: 2.41 (1.26-4.60)], higher parity [OR: 3.60 (1.20-10.82)] and tick infestation [OR: 2.42 (1

  13. Risk Management Technique for design and operation of facilities and equipment

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  14. Internal Arrangement of Skylab Workshop Crew Quarters

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This image depicts a layout of the Skylab workshop 1-G trainer crew quarters. At left, in the sleep compartment, astronauts slept strapped to the walls of cubicles and showered at the center. Next right was the waste management area where wastes were processed and disposed. Upper right was the wardroom where astronauts prepared their meals and foods were stored. In the experiment operation area, upper left, against the far wall, was the lower-body negative-pressure device (Skylab Experiment M092) and the Ergometer for the vectorcardiogram experiment (Skylab Experiment M063). The trainers and mockups were useful in the developmental phase, while engineers and astronauts were still working out optimum designs. They provided much data applicable to the manufacture of the flight articles.

  15. Notable deals in the pharmaceutical industry in the first quarter of 2017.

    PubMed

    Cruces, E

    2017-06-01

    During the first quarter of 2017, Cortellis Competitive Intelligence had 1,073 new deals added as part of its ongoing coverage of pharmaceutical licensing activity. This meant a slight increase on the last quarter (1,022) and a similar volume on the same quarter for the previous 1 year (1,141). However, this quarter showed a significant augment in deals worth more than USD 0.5 billion on the last quarter (17 vs. 12). This article will focus on highlighting a number of the most valuable and notable deals forged during the quarter, as well as a selection of deals from some of the most prolific deal makers. An update on milestone, options and terminated deals of significance will also be presented, along with an early outlook on the next quarter's pharmaceutical licensing activity.

  16. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    COVEY, L.I.

    2000-11-28

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will havemore » been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.« less

  17. Results for the First, Second, and Third Quarter Calendar Year 2015 Tank 50H WAC slurry samples chemical and radionuclide contaminants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    2016-02-18

    This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2015 First, Second, and Third Quarter sampling of Tank 50H for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering (D&S-FE) to support the transfer of low-level aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50H Waste Characterization System. Previous memorandamore » documenting the WAC analyses results have been issued for these three samples.« less

  18. 77 FR 37958 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2012 rail cost adjustment...

  19. 75 FR 35877 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... available on our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting...-3)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2010 rail cost...

  20. 75 FR 58019 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2010 Rail Cost Adjustment...

  1. 75 FR 80895 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2011 Rail Cost Adjustment...

  2. 76 FR 16037 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2011 Rail Cost Adjustment...

  3. 78 FR 37660 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board approves the third quarter 2013 Rail Cost Adjustment Factor...

  4. 76 FR 37191 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2011 Rail Cost Adjustment...

  5. 78 FR 17764 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2013 Rail Cost Adjustment...

  6. Electric power quarterly October--December 1988: Final issue

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The Electric Power Quarterly (EPQ) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA). The EPQ presents information on electric utilities at the national, division, State, company, and plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience, including Congress, Federal, and State agencies; industry; and the general public.more » The data presented in this report were collected and published by the EPA to fulfill its responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This edition of the EPQ contains monthly data for the fourth quarter of 1988. 10 refs., 1 fig., 15 tabs.« less

  7. US energy industry financial developments, 1993 first quarter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-25

    Net income for 259 energy companies-- including, 20 major US petroleum companies-- rose 38 percent between the first quarter of 1992 and the first quarter of 1993. An increased level of economic activity, along with colder weather, helped lift the demand for natural gas. crude oil, coal, and electricity. The sharp rise in the domestic price of natural gas at the wellhead relative to the year-ago quarter was the most significant development in US energy during the first quarter. As a consequence of higher natural gas prices, the upstream segment of the petroleum industry reported large gains in income, whilemore » downstream income rose due to higher refined product demand. Increased economic activity and higher weather-related natural gas demand also led to improvements in income for the rate-regulated energy segment. However, declining domestic oil production continued to restrain upstream petroleum industry earnings growth, despite a moderate rise in crude oil prices.« less

  8. Bulk Shielding Facility quarterly report, April, May and June 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Corbett, B.L.; Lance, E.D.

    1984-12-01

    The BSR operated at an average power level of 1310 kW for 3.8% of the time during April, May, and June. Water-quality control in both the reactor primary and secondary cooling systems was satisfactory. The PCA was used in training startups and was operated on five occasions for the NBS and HEDL recheck of a previous experiment run on the LWR pressure vessel surveillance dosimetry improvement program.

  9. Photographic copy of floor plans for Bachelor Officers' Quarters (Tl) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of floor plans for Bachelor Officers' Quarters (T-l) known as the "Desert Rat Hotel" in the early days of the Muroc Flight Test Base (North Base). The plans show the layout of quarters, lavatories, mess as well as, the cooling system installation. Contract W-509-Eng 2937, Military Construction; Muroc Bombing Range, Muroc Lake, Calif; Materiel Test Site, Officers Quarters, Evaporative Coolers, Sheet 5 of 11, May 1942. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Bachelor Officers' Quarters T-1, Second & C Streets, Boron, Kern County, CA

  10. WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WARRANT OFFICER AND CIVILIAN HOUSING, QUARTERS L FRONT ELEVATION. - Naval Magazine Lualualei, Headquarters Branch, Warrant Officer's & Civilians Quarters Type, Along Sixty-sixth Street between Amberjack & Constitution Streets, Pearl City, Honolulu County, HI

  11. 12 CFR 620.10 - Preparing the quarterly report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Preparing the quarterly report. 620.10 Section 620.10 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DISCLOSURE TO SHAREHOLDERS... must: (1) Prepare and send, to the Farm Credit Administration, an electronic copy of its quarterly...

  12. 76 FR 80448 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2012 rail cost adjustment factor (RCAF... decision, which is available on our Web site, http://www.stb.dot.gov . Copies of the decision may be...

  13. 77 FR 58910 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2012 rail cost adjustment factor (RCAF...

  14. Numerical simulations of the first operational conditions of the negative ion test facility SPIDER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serianni, G., E-mail: gianluigi.serianni@igi.cnr.it; Agostinetti, P.; Antoni, V.

    2016-02-15

    In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained.

  15. Numerical simulations of the first operational conditions of the negative ion test facility SPIDER

    NASA Astrophysics Data System (ADS)

    Serianni, G.; Agostinetti, P.; Antoni, V.; Baltador, C.; Cavenago, M.; Chitarin, G.; Marconato, N.; Pasqualotto, R.; Sartori, E.; Toigo, V.; Veltri, P.

    2016-02-01

    In view of the realization of the negative ion beam injectors for ITER, a test facility, named SPIDER, is under construction in Padova (Italy) to study and optimize production and extraction of negative ions. The present paper is devoted to the analysis of the expected first operations of SPIDER in terms of single-beamlet and multiple-beamlet simulations of the hydrogen beam optics in various operational conditions. The effectiveness of the methods adopted to compensate for the magnetic deflection of the particles is also assessed. Indications for a sequence of the experimental activities are obtained.

  16. The AMTEX Partnership{trademark}. Fourth quarter FY95 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operations and program management of the AMTEX Partnership{trademark} is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership. Progress is reported on the following projects: computer-aided fabric evaluation;more » cotton biotechnology; demand activated manufacturing architecture; electronic embedded fingerprints; on-line process control for flexible fiber manufacturing; rapid cutting; sensors for agile manufacturing; and textile resource conservation.« less

  17. Adjustment Notes for Apprentice and Trainee Estimates: December Quarter 2014. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to National Centre for Vocational Education Research (NCVER) on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred…

  18. Classification of Reactor Facility Operational State Using SPRT Methods with Radiation Sensor Networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramirez Aviles, Camila A.; Rao, Nageswara S.

    We consider the problem of inferring the operational state of a reactor facility by using measurements from a radiation sensor network, which is deployed around the facility’s ventilation stack. The radiation emissions from the stack decay with distance, and the corresponding measurements are inherently random with parameters determined by radiation intensity levels at the sensor locations. We fuse measurements from network sensors to estimate the intensity at the stack, and use this estimate in a one-sided Sequential Probability Ratio Test (SPRT) to infer the on/off state of the reactor facility. We demonstrate the superior performance of this method over conventionalmore » majority vote fusers and individual sensors using (i) test measurements from a network of NaI sensors, and (ii) emulated measurements using radioactive effluents collected at a reactor facility stack. We analytically quantify the performance improvements of individual sensors and their networks with adaptive thresholds over those with fixed ones, by using the packing number of the radiation intensity space.« less

  19. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... PROSPECTIVE PAYMENT SYSTEMS FOR INPATIENT HOSPITAL SERVICES Prospective Payment System for Inpatient Hospital...

  20. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 2 2013-10-01 2013-10-01 false Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... PROSPECTIVE PAYMENT SYSTEMS FOR INPATIENT HOSPITAL SERVICES Prospective Payment System for Inpatient Hospital...

  1. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... PROSPECTIVE PAYMENT SYSTEMS FOR INPATIENT HOSPITAL SERVICES Prospective Payment System for Inpatient Hospital...

  2. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 2 2014-10-01 2014-10-01 false Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... PROSPECTIVE PAYMENT SYSTEMS FOR INPATIENT HOSPITAL SERVICES Prospective Payment System for Inpatient Hospital...

  3. 42 CFR 412.405 - Preadmission services as inpatient operating costs under the inpatient psychiatric facility...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 2 2012-10-01 2012-10-01 false Preadmission services as inpatient operating costs under the inpatient psychiatric facility prospective payment system. 412.405 Section 412.405 Public... PROSPECTIVE PAYMENT SYSTEMS FOR INPATIENT HOSPITAL SERVICES Prospective Payment System for Inpatient Hospital...

  4. Apprentices & Trainees: Early Trend Estimates. December Quarter, 2014

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    This publication presents early estimates of apprentice and trainee commencements for the December quarter 2014. Indicative information about this quarter is presented here; the most recent figures are estimated, taking into account reporting lags that occur at the time of data collection. The early trend estimates are derived from the National…

  5. Apprentices & Trainees: Early Trend Estimates. March Quarter, 2012

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2012

    2012-01-01

    This publication presents early estimates of apprentice and trainee commencements for the March quarter 2012. Indicative information about this quarter is presented here; the most recent figures are estimated, taking into account reporting lags that occur at the time of data collection. The early trend estimates are derived from the National…

  6. 12 CFR 620.10 - Preparing the quarterly report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 620.10 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DISCLOSURE TO SHAREHOLDERS... must: (1) Prepare and send, to the Farm Credit Administration, an electronic copy of its quarterly...) Publish a copy of its quarterly report on its Web site when it electronically sends the report to the Farm...

  7. Adjustment Notes for Apprentice and Trainee Estimates: December Quarter 2016. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2017

    2017-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to NCVER on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred to as Collection 2, Collection 3 and so on. NCVER…

  8. Adjustment Notes for Apprentice and Trainee Estimates: September Quarter 2016. Support Document

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2017

    2017-01-01

    Apprentice and trainee data are reported by the State and Territory Training Authorities to NCVER on a quarterly basis, starting at the September quarter of 1994. The set of data submitted that quarter is referred to as Collection 1. The sets of data submitted in subsequent quarters are referred to as Collection 2, Collection 3 and so on. NCVER…

  9. Facility versus unit level reporting of quality indicators in nursing homes when performance monitoring is the goal

    PubMed Central

    Norton, Peter G; Murray, Michael; Doupe, Malcolm B; Cummings, Greta G; Poss, Jeff W; Squires, Janet E; Teare, Gary F; Estabrooks, Carole A

    2014-01-01

    Objectives To demonstrate the benefit of defining operational management units in nursing homes and computing quality indicators on these units as well as on the whole facility. Design Calculation of adjusted Resident Assessment Instrument – Minimum Data Set 2.0 (RAI–MDS 2.0) quality indicators for: PRU05 (prevalence of residents with a stage 2–4 pressure ulcer), PAI0X (prevalence of residents with pain) and DRG01 (prevalence of residents receiving an antipsychotic with no diagnosis of psychosis), for quarterly assessments between 2007 and 2011 at unit and facility levels. Comparisons of these risk-adjusted quality indicators using statistical process control (control charts). Setting A representative sample of 30 urban nursing homes in the three Canadian Prairie Provinces. Measurements Explicit decision rules were developed and tested to determine whether the control charts demonstrated improving, worsening, unchanging or unclassifiable trends over the time period. Unit and facility performance were compared. Results In 48.9% of the units studied, unit control chart performance indicated different changes in quality over the reporting period than did the facility chart. Examples are provided to illustrate that these differences lead to quite different quality interventions. Conclusions Our results demonstrate the necessity of considering facility-level and unit-level measurement when calculating quality indicators derived from the RAI–MDS 2.0 data, and quite probably from any RAI measures. PMID:24523428

  10. Development and operation of a mobile test facility for education

    NASA Astrophysics Data System (ADS)

    Davis, Christopher T.

    The automotive industry saw a large shift towards vehicle electrification after the turn of the century. It became necessary to ensure that new and existing engineers were qualified to design and calibrate these new systems. To ensure this training, Michigan Tech received a grant to develop a curriculum based around vehicle electrification. As part of this agenda, the Michigan Tech Mobile Laboratory was developed to provide hands-on training for professional engineers and technicians in hybrid electric vehicles and vehicle electrification. The Mobile Lab has since then increased the scope of the delivered curriculum to include other automotive areas and even customizable course content to meet specific needs. This thesis outlines the development of the Mobile Laboratory and its powertrain test facilities. The focus of this thesis is to discuss the different hardware and software systems within the lab and test cells. Detailed instructions on the operation and maintenance of each of the systems are discussed. In addition, this thesis outlines the setup and operation of the necessary equipment for several of the experiments for the on and off campus courses and seminars.

  11. REACTOR PHYSICS QUARTERLY REPORT JANUARY, FEBRUARY, MARCH 1970

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmid, L. C.; Clayton, E. D.; Heineman, R. E.

    1970-05-01

    The objective of the Reactor Physics Quarterly Report is to inform the scientific community in a timely manner of the technical progress made on the many phases of reactor physics work within the laboratory. The report contains brief technical discussions of accomplishments in all areas where significant progress has been made during the quarter.

  12. Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-04

    NASA Technical Reports Server (NTRS)

    Bauman, William; Wheeler, Mark; Lambert, Winifred; Case, Jonathan; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (A MU) activities for the fourth quarter of Fiscal Year 2004 (July -Sept 2004). Tasks covered are: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Shuttle Ascent Camera Cloud Obstruction Forecast, (5) Advanced Regional Prediction System (ARPS) Optimization and Training Extension and (5) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest.

  13. [Alcohol and drug misuse of the elderly in health care facilities].

    PubMed

    Kuhn, S; Haasen, C

    2012-05-01

    A nationwide representative survey was conducted in residential care facilities and facilities offering care for the elderly in their homes (home care facilities) with the aim to estimate the rate of alcohol and drug misuse among this population and to evaluate the way in which nursing staff deal with the problem. A total of 5000 randomly selected facilities were contacted with a 2-page questionnaire. Reliable data were obtained from 550 residential care facilities and from 436 home care facilities. According to the investigated facilities, the mean rate of misuse among the elderly was 14%. Nearly all facilities acknowledge the necessity to react to these facts, but only a quarter of them considered their staff to be sufficiently trained. 38.4% of the residential care facilities and 26.9% of the home care facilities have a concept on how to react to misuse problems. Addiction services are rarely contacted. The prevalence of alcohol and drug misuse among the elderly in health care facilities is high compared to the same age cohort of the total population. The lack of networking between facilities for the elderly and addiction services is remarkable. © Georg Thieme Verlag KG Stuttgart · New York.

  14. Coleman in sleeping quarters

    NASA Image and Video Library

    2010-12-25

    ISS026-E-012158 (25 Dec. 2010) --- NASA astronaut Catherine (Cady) Coleman, Expedition 26 flight engineer, and one of six crew members currently aboard the International Space Station, peeks out of her sleeping quarters on Christmas morning to view the station’s decorations and gifts.

  15. English Leadership Quarterly, 1992.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1992-01-01

    These four issues of the English Leadership Quarterly represent those published during 1992. Articles in number 1 deal with testing assessing, and measuring student performance, and include: "Real Evaluation: Portfolios as an Effective Alternative to Standardized Testing" (Kate Kiefer); "No More Objective Tests, Ever" (Carol…

  16. English Leadership Quarterly, 1993.

    ERIC Educational Resources Information Center

    Strickland, James, Ed.

    1993-01-01

    These four issues of the English Leadership Quarterly represent those published during 1993. Articles in number 1 deal with parent involvement and participation, and include: "Opening the Doors to Open House" (Jolene A. Borgese); "Parent/Teacher Conferences: Avoiding the Collision Course" (Robert Perrin); "Expanding Human…

  17. 77 FR 38211 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY..., the Federal Motor Carrier Safety Administration (FMCSA) eliminates the quarterly financial reporting... would be ineffective or unacceptable without a change. III. Background Annual Financial Reporting...

  18. 78 FR 31475 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY...); request for comments. SUMMARY: FMCSA proposes to eliminate the quarterly financial reporting requirements... person argued that the financial reporting requirements transferred from the Interstate Commerce...

  19. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  20. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.