Sample records for facility permit update

  1. WIPP Hazardous Waste Facility Permit Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kehrman, B.; Most, W.

    2006-07-01

    The Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit (HWFP) was issued on October 27, 1999 [1]. Since that time, the WIPP has sought modifications to clarify the permit language, provide alternative methods for meeting permit requirements and to update permit conditions. Significant advancements have been made in transuranic (TRU) waste management as the result of modifications to the HWFP. Among these advancements is a modification to obtain a drum age criteria (DAC) value to perform headspace gas sampling on drums to be super-compacted and placed in a 100-gallon overpack drum. In addition, the Section 311 permit modification requestmore » that would allow for more efficient waste characterization, and the modification to authorize the shipment and disposal of Remote-Handled (RH) TRU waste were merged together and submitted to the regulator as the Consolidated Permit Modification Request (PMR). The submittal of the Consolidated PMR came at the request of the regulator as part of responses to Notices of Deficiency (NODs) for the separate PMRs which had been submitted in previous years. Section 311 of the fiscal year 2004 Energy and Water Developments Appropriations Act (Public Law 108-137) [2] directs the Department of Energy to submit a permit modification that limits waste confirmation to radiography or visual examination of a statistical subpopulation of containers. Section 311 also specifically directs that disposal room performance standards be to be met by monitoring for volatile organic compounds in the underground disposal rooms. This statute translates into the elimination of other waste confirmation methods such as headspace gas sampling and analysis and solids sampling and analysis. These methods, as appropriate, will continue to be used by the generator sites during hazardous waste determinations or characterization activities. This modification is expected to reduce the overall cost of waste analysis by hundreds of millions of

  2. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit applicationmore » guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than

  3. Hydroelectric Generating Facilities General Permit ...

    EPA Pesticide Factsheets

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  4. NPDES Permit for Riverview Estates Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number ND-0031143, the Riverview Estates Wastewater Treatment Facility is authorized to discharge from its wastewater treatment facility in designated locations as described in the permit.

  5. NPDES Permit: Shiprock Wastewater Treatment Facility, Shiprock, New Mexico

    EPA Pesticide Factsheets

    NPDES Permit, Fact Sheet, and Response to Comments explaining EPA's issue of NPDES Permit No. NN0020621 to the Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility, Shiprock, San Juan County, New Mexico.

  6. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl; Buttner, William; Burgess, Robert

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  7. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units

  8. Hanford facility dangerous waste permit application, general information portion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion ismore » broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).« less

  9. Hanford facility dangerous waste permit application, PUREX storage tunnels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, C. R.

    1997-09-08

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).

  10. Potable Water Treatment Facility General Permit (PWTF GP) ...

    EPA Pesticide Factsheets

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  11. Hanford Facility Dangerous Waste Permit Application for T Plant Complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BARNES, B.M.

    2002-09-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the T Plant Complex (this document, DOE/RL-95-36). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agencymore » (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the T Plant Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the T Plant Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text.« less

  12. General Air Quality Permit Request for Coverage: US Silica - Parshall Transload Facility

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.

  13. Stone Quarrying, Crushing and Screening Facilities General Air Quality Permit Request for Coverage: US Silica - Parshall Transload Facility

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing, and Screening Facilities General Permit Indian Reservation, US Silica, Parshall Transload Facility, Fort Berthold Indian Reservation, North Dakota.

  14. NPDES Permit for Charlo Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0022551, the Consolidated Charlo-Lake County Water & Sewer District is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to an unnamed swale that runs to Dublin Gulch.

  15. 34 CFR 395.16 - Permit for the establishment of vending facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., the number, location and type of vending machines and other terms and conditions desired to be... 34 Education 2 2010-07-01 2010-07-01 false Permit for the establishment of vending facilities. 395...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM...

  16. NPDES Draft Permit for MHA Interpretive Center Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under draft NPDES permit ND0031160, the Mandan, Hidatsa, and Arikara (MHA) Nation Public Works is authorized to discharge from its MHA Interpretive Center wastewater treatment facility to Missouri River as set forth in the permit.

  17. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Mike

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistentmore » with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.« less

  18. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  19. NPDES Permit for Fort Carson Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit no. CO-0021181 the United States Department of the Army, Fort Carson, in authorized to discharge from its sanitary wastewater treatment facility in El Paso County, Colorado, to Clover Ditch, a tributary of Fountain Creek.

  20. NPDES Draft Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit ND0030813, the Dakota Magic Hotel and Casino WWTF is authorized to discharge, in accordance with the requirements as contained in the provisions of this Permit, from its wastewater treatment facility to the Bois de Sioux.

  1. NPDES Permit for Yellowtail Dam Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0022993, the U.S. Bureau of Reclamation is authorized to discharge from its wastewater treatment facility located at the Yellowtail Dam Field Office in Big Horn County, Montana, to the Yellowtail Afterbay Reservoir/Bighorn River.

  2. 50 CFR 22.26 - Permits for eagle take that is associated with, but not the purpose of, an activity.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., including any of the following: (i) update fatality predictions for the facility; (ii) require implementation of additional conservation measures as described in the permit; (iii) update monitoring... or revoked, and have not been convicted of violating a Federal wildlife law in the last 10 years. The...

  3. 21 CFR 1.234 - How and when do you update your facility's registration information?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 60 calendar days of the change and the new owner must re-register the facility as specified in § 1... update. (1) To update your registration electronically, you must update at http://www.fda.gov/furls. (2...

  4. 21 CFR 1.234 - How and when do you update your facility's registration information?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 60 calendar days of the change and the new owner must re-register the facility as specified in § 1... update. (1) To update your registration electronically, you must update at http://www.fda.gov/furls. (2...

  5. 21 CFR 1.234 - How and when do you update your facility's registration information?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 60 calendar days of the change and the new owner must re-register the facility as specified in § 1... update. (1) To update your registration electronically, you must update at http://www.fda.gov/furls. (2...

  6. 21 CFR 1.234 - How and when do you update your facility's registration information?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 60 calendar days of the change and the new owner must re-register the facility as specified in § 1... update. (1) To update your registration electronically, you must update at http://www.fda.gov/furls. (2...

  7. 21 CFR 1.234 - How and when do you update your facility's registration information?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 60 calendar days of the change and the new owner must re-register the facility as specified in § 1... update. (1) To update your registration electronically, you must update at http://www.fda.gov/furls. (2...

  8. NPDES Permit for Yellowtail Visitor Center Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    NPDES permit MT-0029106 for United States Bureau of Reclamation discharge from its Yellowtail Visitor Center wastewater treatment facility into the Bighorn Lake/Bighorn River in Big Horn County, Montana.

  9. NPDES Permit for Soap Creek Associates Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT-0023183, Soap Creek Associates, Inc. is authorized to discharge from its wastewater treatment facility located in West, Bighorn County, Montana, to Soap Creek.

  10. NPDES Permit for Lame Deer Lagoon Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Final permit authorizes the Northern Cheyenne Utilities Commission to discharge from its Lame Deer Lagoon wastewater treatment facility located in Rosebud County, Montana to Lame Deer Creek, a tributary to Rosebud Creek.

  11. NPDES Permit for City of Polson Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT-0020559, the City of Polson is authorized to discharge from its wastewater treatment facility located in Lake County, Montana to the Flathead River.

  12. NPDES Permit for Woodcock Home Addition Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0030554, the Salish and Kootenai Housing Authority is authorized to discharge from its Woodcock Home Addition Wastewater Treatment Facility in Lake County, Montana, to a swale draining to Middle Crow Creek.

  13. Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility; Draft NPDES Permit

    EPA Pesticide Factsheets

    EPA is proposing to issue a NPDES permit (No. NN0020621) to Navajo Tribal Utility Authority (NTUA) for the Shiprock wastewater treatment facility in San Juan County, New Mexico, within the northeastern portion of the Navajo Nation.

  14. An Update of the Nation's Long-Term Strategic Needs for NASA's Aeronautics Test Facilities

    NASA Technical Reports Server (NTRS)

    Anton, Philip S.; Raman, Raj; Osburg, Jan; Kallimani, James G.

    2009-01-01

    The National Aeronautics and Space Administration's (NASA's) major wind tunnel (WT), propulsion test (PT), and simulation facilities exist to serve NASA's and the nation's aeronautics needs. RAND Corporation researchers conducted a prior study of these facilities from 2002 to 2003, identifying (1) NASA's continuing ability to serve national needs, (2) which facilities appear strategically important from an engineering perspective given the vehicle classes the nation investigates and produces, and (3) management challenges and issues. This documented briefing (DB) is the final report from a new, one-year study (conducted from September 2006 through January 2008), partially updating the prior assessment. The study focuses on updating the list of facilities in the prior study that were deemed to be strategically important (again, from an engineering perspective) in serving those needs. This update also adds a new assessment of national needs for six major aeronautics simulators at NASA and lists those deemed strategically important.

  15. Synthetic Minor NSR Permit: Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility

    EPA Pesticide Factsheets

    This page contains the response to public comments and final synthetic minor NSR permit for the Chemtrade Refinery Services, Inc. Riverton, Wyoming Facility, operated by Chemtrade Logistics and located on the Wind River Indian Reservation in Fremont County

  16. 40 CFR 124.206 - In what situations may I require a facility owner or operator to apply for an individual permit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... history of significant non-compliance with regulations or permit conditions. (3) The facility has a demonstrated history of submitting incomplete or deficient permit application information. (4) The facility has... standardized RCRA permit. (2) Circumstances have changed since the time the facility owner or operator applied...

  17. NPDES Permit for Keller Transport, Inc. Groundwater Remediation Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT0030805, Keller Transport, Inc. is authorized to discharge from its groundwater remediation treatment facility in Lake County, Montana, to Flathead Lake.

  18. Potable Water Treatment Facility General Permit (PWTF GP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the draft NPDES General Permit for Discharges from Potable Water Treatment Facilities in Massachusetts (MAG640000) and New Hampshire (NHG640000).

  19. Indian Test Facility (INTF) and its updates

    NASA Astrophysics Data System (ADS)

    Bandyopadhyay, M.; Chakraborty, A.; Rotti, C.; Joshi, J.; Patel, H.; Yadav, A.; Shah, S.; Tyagi, H.; Parmar, D.; Sudhir, Dass; Gahlaut, A.; Bansal, G.; Soni, J.; Pandya, K.; Pandey, R.; Yadav, R.; Nagaraju, M. V.; Mahesh, V.; Pillai, S.; Sharma, D.; Singh, D.; Bhuyan, M.; Mistry, H.; Parmar, K.; Patel, M.; Patel, K.; Prajapati, B.; Shishangiya, H.; Vishnudev, M.; Bhagora, J.

    2017-04-01

    To characterize ITER Diagnostic Neutral Beam (DNB) system with full specification and to support IPR’s negative ion beam based neutral beam injector (NBI) system development program, a R&D facility, named INTF is under commissioning phase. Implementation of a successful DNB at ITER requires several challenges need to be overcome. These issues are related to the negative ion production, its neutralization and corresponding neutral beam transport over the path lengths of ∼ 20.67 m to reach ITER plasma. DNB is a procurement package for INDIA, as an in-kind contribution to ITER. Since ITER is considered as a nuclear facility, minimum diagnostic systems, linked with safe operation of the machine are planned to be incorporated in it and so there is difficulty to characterize DNB after onsite commissioning. Therefore, the delivery of DNB to ITER will be benefited if DNB is operated and characterized prior to onsite commissioning. INTF has been envisaged to be operational with the large size ion source activities in the similar timeline, as with the SPIDER (RFX, Padova) facility. This paper describes some of the development updates of the facility.

  20. NPDES Permit for City of Wagner Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0020184, the City of Wagner, South Dakota is authorized to discharge from its wastewater treatment facility in Charles Mix County, South Dakota, to an unnamed tributary of Choteau Creek.

  1. NPDES Permit for Town of Hot Springs Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT0020591, the Town of Hot Springs, Montana, is authorized to discharge from its wastewater treatment facility located in Sanders County, Montana, to a ditch discharging to Hot Springs Creek.

  2. NPDES Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  3. NPDES Permit for Town of Lodge Grass Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT0021890, the Town of Lodge Grass is authorized to discharge from from its wastewater treatment facility in Big Horn County to an unnamed slough to the Little Bighorn River.

  4. NPDES Permit for the St. Ignatius-Southside Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0029017, the Salish and Kootenai Housing Authority of the Confederated Salish and Kootenai Tribes is authorized to discharge from its wastewater treatment facility in Lake County, Montana to an unnamed tributary of Sabine Creek.

  5. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  6. NPDES Permit for Rosebud Casino and Hotel Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  7. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  8. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  9. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  10. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  11. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  12. NPDES Draft Permit for Southern Ute Indian Tribe Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES draft permit number CO-0022853, the Southern Ute Indian Tribe is authorized to discharge from its wastewater treatment facility in La Plata County, Colorado,to Rock Creek, a tributary of the Los Pinos River.

  13. NPDES Permit for City of Eagle Butte Wastewater Treatment Facility in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0020192, the City of Eagle Butte, South Dakota, is authorized to discharge from its wastewater treatment facility within the Cheyenne River Sioux Reservation in Dewey County, South Dakota, to Green Grass Creek.

  14. NPDES Permit for U.S. Air Force Academy Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0020974, the U.S. Air Force Academy is authorized to discharge from its wastewater treatment facility in El Paso County, Colorado, to Non-Potable Reservoir No. 1 on Lehman Run and to Monument Creek.

  15. A New Concept: Use of Negotiations in the Hazardous Waste Facility Permitting Process in New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, G.J.; Rose, W.M.; Domenici, P.V.

    This paper describes a unique negotiation process leading to authorization of the U.S. Department of Energy (DOE) to manage and dispose remote-handled (RH) transuranic (TRU) mixed wastes at the Waste Isolation Pilot Plant (WIPP). The negotiation process involved multiple entities and individuals brought together under authority of the New Mexico Environment Department (NMED) to discuss and resolve technical and facility operational issues flowing from an NMED-issued hazardous waste facility Draft Permit. The novel negotiation process resulted in numerous substantive changes to the Draft Permit, which were ultimately memorialised in a 'Draft Permit as Changed'. This paper discusses various aspects ofmore » the negotiation process, including events leading to the negotiations, regulatory basis for the negotiations, negotiation participants, and benefits of the process. (authors)« less

  16. RCRA, superfund and EPCRA hotline training module. Introduction to: Permits and interim status (40 cfr part 270) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    Owners/operators of facilities that treat, store, or dispose of hazardous waste must obtain an operating permit, as required by Subtitle C of the Resource Conservation and Recovery Act (RCRA). The module presents an overview of the RCRA permitting process and the requirements that apply to TSDFs operating under interim status until a permit is issued. The regulations governing the permit process are found in 40 CFR Parts 124 through 270.

  17. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specifiedmore » in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.« less

  18. Hazardous Waste Permitting

    EPA Pesticide Factsheets

    To provide RCRA hazardous waste permitting regulatory information and resources permitted facilities, hazardous waste generators, and permit writers. To provide the public with information on how they can be involved in the permitting process.

  19. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  20. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  1. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  2. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Requirements for public participation in the permitting of facilities. 256.63 Section 256.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE...

  3. Stone Quarrying, Crushing and Screening Facilities General Air Quality Permit Request for Coverage: Unimin Corporation - Unimin Flat Storage

    EPA Pesticide Factsheets

    Documents related to Request for Coverage under Stone Quarrying, Crushing and Screening Facilities General Permit, for the Unimin Corporation Silica Sand Rail Transloading Facility on the Fort Berhold Indian Reservation, North Dakota.

  4. NPDES Permit for F.E. Warren Air Force Base Missile Launch Facilities in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034789, the USAF, F. E. Warren Air Force Base, is authorized to discharge from the Missile Launch Facilities located in northeastern Colorado to unnamed drainage ditches located in the Cedar Creek and Pawnee Creek drainage basins.

  5. NPDES Permit for Dakota Magic Casino and Hotel Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND0030813, the the Dakota Magic Casino and Hotel is authorized is authorized to discharge from its wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  6. Synthetic Minor NSR Permit: Van Hook Crude Terminal, LLC - Van Hook Crude Terminal/Rail Loading Facility

    EPA Pesticide Factsheets

    This page contains the current effective synthetic minor NSR permit for the Van Hook Crude Terminal, LLC, Van Hook Crude Terminal/Rail Loading Facility, located on the Fort Berthold Indian Reservation in Mountrail County, ND.

  7. Report: Better Enforcement Oversight Needed for Major Facilities with Water Discharge Permits in Long-Term Significant Noncompliance

    EPA Pesticide Factsheets

    Report #2007-P-00023, May 14, 2007. EPA did not provide effective enforcement oversight of major facilities with National Pollutant Discharge Elimination System permits in long-term significant noncompliance.

  8. 76 FR 26431 - Medicare Program; Inpatient Psychiatric Facilities Prospective Payment System-Update for Rate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ...This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) for discharges occurring during the rate year (RY) beginning July 1, 2011 through September 30, 2012. The final rule also changes the IPF prospective payment system (PPS) payment rate update period to a RY that coincides with a fiscal year (FY). In addition, the rule implements policy changes affecting the IPF PPS teaching adjustment. It also rebases and revises the Rehabilitation, Psychiatric, and Long-Term Care (RPL) market basket, and makes some clarifications and corrections to terminology and regulations text.

  9. 76 FR 11339 - Update to NFPA 101, Life Safety Code, for State Home Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 51 RIN 2900-AN59 Update to NFPA 101, Life Safety Code..., Life Safety Code. The change is designed to assure that State Home facilities meet current industry- wide standards regarding life safety and fire safety. DATES: Effective Date: This final rule is...

  10. Ships Docked at Title V Permitted Facilities

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. 42 CFR 412.428 - Publication of Updates to the inpatient psychiatric facility prospective payment system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the methodology and data used to calculate the updated Federal per diem base payment amount. (b)(1... maintain the appropriate outlier percentage. (e) Describe the ICD-9-CM coding changes and DRG... psychiatric facilities for which the fiscal intermediary obtains inaccurate or incomplete data with which to...

  12. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  13. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  14. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Terms of permit. 13.4 Section 13.4 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND PERSONS § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be...

  15. Evoqua RCRA Permit Application and Draft Permit Documents

    EPA Pesticide Factsheets

    Documents pertaining to the proposed RCRA permit for the Evoqua Water Technologies LLC carbon regeneration facility located on the Colorado River Indian Tribes (CRIT) reservation near Parker, Arizona.

  16. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81more » Water Services waste water.« less

  17. 50 CFR 622.270 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Dolphin and Wahoo Fishery Off the Atlantic States § 622.270 Permits. (a) Commercial vessel permits. (1) For a person aboard... the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must...

  18. An Updated Performance Assessment For A New Low-Level Radioactive Waste Disposal Facility In West Texas - 12192

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dornsife, William P.; Kirk, J. Scott; Shaw, Chris G.

    2012-07-01

    This Performance Assessment (PA) submittal is an update to the original PA that was developed to support the licensing of the Waste Control Specialists LLC Low-Level Radioactive Waste (LLRW) disposal facility. This update includes both the Compact Waste Facility (CWF) and the Federal Waste Facility (FWF), in accordance with Radioactive Material License (RML) No. R04100, License Condition (LC) 87. While many of the baseline assumptions supporting the initial license application PA were incorporated in this update, a new transport code, GoldSim, and new deterministic groundwater flow codes, including HYDRUS and MODFLOWSURFACT{sup TM}, were employed to demonstrate compliance with the performancemore » objectives codified in the regulations and RML No. R04100, LC 87. A revised source term, provided by the Texas Commission on Environmental Quality staff, was used to match the initial 15 year license term. This updated PA clearly confirms and demonstrates the robustness of the characteristics of the site's geology and the advanced engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public and site workers predicted in the initial and updated PA were a small fraction of the criterion doses of 0.25 mSv and 50 mSv, respectively. In a comparison between the results of the updated PA against the one developed in support of the initial license, both clearly demonstrated the robustness of the characteristics of the site's geology and engineering design of the disposal units. Based on the simulations from fate and transport models, the radiation doses to members of the general public predicted in the initial and updated PA were a fraction of the allowable 25 mrem/yr (0.25 m sievert/yr) dose standard for tens-of-thousands of years into the future. Draft Texas guidance on performance assessment (TCEQ, 2004) recommends a period of analysis equal to 1,000 years or until peak doses from the

  19. 77 FR 41258 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  20. 76 FR 43819 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  1. 76 FR 19975 - Proposed Information Collection; Comment Request; Survey of Building and Zoning Permit Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... local building permit officials needed for updating the universe of permit-issuing places. The questions... issued. The universe of permit-issuing places is the sampling frame for the Building Permits Survey (BPS...

  2. 76 FR 45792 - Proposed Reissuance of a General NPDES Permit for Facilities Related to Oil and Gas Extraction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... General NPDES Permit for Facilities Related to Oil and Gas Extraction AGENCY: Environmental Protection... (GP) regulating activities related to the extraction of oil and gas on the North Slope of the Brooks... intended to regulate activities related to the extraction of oil and gas on the North Slope of the Brooks...

  3. Atmospheric release model for the E-area low-level waste facility: Updates and modifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The atmospheric release model (ARM) utilizes GoldSim® Monte Carlo simulation software (GTG, 2017) to evaluate the flux of gaseous radionuclides as they volatilize from E-Area disposal facility waste zones, diffuse into the air-filled soil pores surrounding the waste, and emanate at the land surface. This report documents the updates and modifications to the ARM for the next planned E-Area PA considering recommendations from the 2015 PA strategic planning team outlined by Butcher and Phifer.

  4. The National Solar Permitting Database

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunderson, Renic

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identifymore » best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."« less

  5. Technical Guidance for Title V Permitting of Printing Facilities

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  7. 40 CFR 270.40 - Transfer of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 270.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Changes to Permit § 270.40... Act. (b) Changes in the ownership or operational control of a facility may be made as a Class 1...

  8. Design update and recent results of the Apollon 10 PW facility

    NASA Astrophysics Data System (ADS)

    Le Garrec, B.; Papadopoulos, D. N.; Le Blanc, C.; Zou, J. P.; Chériaux, G.; Georges, P.; Druon, F.; Martin, L.; Fréneaux, L.; Beluze, A.; Lebas, N.; Mathieu, F.; Audebert, P.

    2017-05-01

    In this paper we are giving a summary of the Apollon 10 PW facility laser design together with updated laser performance. The Apollon facility is currently under construction in France. The APOLLON laser system is a laser designed for delivering pulses as short as 15 fs (10-15 s) with an energy exceeding 150 Joules on target. The peak power delivered by this laser system will be 10 Petawatts (1016W). The Apollon laser system will be delivering 4 beams: one 10 PW beam (F1 beam 400 mm diameter), one 1 PW beam (F2 beam 140 mm diameter) and two additional probe beams (F3 and F4) at a repetition rate of 1 shot per minute. The laser system is based on Ti-sapphire amplifiers pumped by frequency doubled solid-state lasers. The repetition rate of the high energy part will be 1 shot per minute. The main beam at the output of the last amplifier will be split and dispatched to two experimental areas. The main laser beam is delivering 30 J before compression at a repetition rate of 1 shot per minute and we are currently increasing to get 100J.

  9. Update to Sanctions Policy for State Title V Operating Permits Programs

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Brandaris 128 ultra-high-speed imaging facility: 10 years of operation, updates, and enhanced features

    NASA Astrophysics Data System (ADS)

    Gelderblom, Erik C.; Vos, Hendrik J.; Mastik, Frits; Faez, Telli; Luan, Ying; Kokhuis, Tom J. A.; van der Steen, Antonius F. W.; Lohse, Detlef; de Jong, Nico; Versluis, Michel

    2012-10-01

    The Brandaris 128 ultra-high-speed imaging facility has been updated over the last 10 years through modifications made to the camera's hardware and software. At its introduction the camera was able to record 6 sequences of 128 images (500 × 292 pixels) at a maximum frame rate of 25 Mfps. The segmented mode of the camera was revised to allow for subdivision of the 128 image sensors into arbitrary segments (1-128) with an inter-segment time of 17 μs. Furthermore, a region of interest can be selected to increase the number of recordings within a single run of the camera from 6 up to 125. By extending the imaging system with a laser-induced fluorescence setup, time-resolved ultra-high-speed fluorescence imaging of microscopic objects has been enabled. Minor updates to the system are also reported here.

  11. 40 CFR 147.2927 - Permit modification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are substantial changes to the facility or activity which occurred after permit issuance that justify... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Permit modification. 147.2927 Section 147.2927 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS...

  12. 50 CFR 622.240 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of... golden crab harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a...

  13. Medicare program; inpatient psychiatric facilities prospective payment system--update for fiscal year beginning October 1, 2014 (FY 2015). Final rule.

    PubMed

    2014-08-06

    This final rule will update the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs). These changes will be applicable to IPF discharges occurring during the fiscal year (FY) beginning October 1, 2014 through September 30, 2015. This final rule will also address implementation of ICD-10-CM and ICD-10-PCS codes; finalize a new methodology for updating the cost of living adjustment (COLA), and finalize new quality measures and reporting requirements under the IPF quality reporting program.

  14. Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation: Coverage Under General Air Quality Permit for Stone Quarrying, Crushing and Screening Facilities

    EPA Pesticide Factsheets

    Documents related to approved request for coverage under the Stone Quarrying, Crushing and Screening Facilities General Permit for Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation located in McKinley and San Juan Counties, NM.

  15. 77 FR 59186 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... ENVIRONMENTAL PROTECTION AGENCY [Petition IV-2011-1; FRL-9734-2] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Tennessee Valley Authority's Shawnee Fossil... Valley Authority for its Shawnee Fossil Plant (SFP) facility located in West Paducah, Kentucky. This...

  16. Rosebud Casino and Hotel NPDES Proposed Permit

    EPA Pesticide Factsheets

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  17. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  18. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  19. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  20. 33 CFR 126.27 - General permit for handling dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... dangerous cargo. 126.27 Section 126.27 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.27 General permit for handling dangerous cargo. A general permit is hereby issued for the handling, storing...

  1. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  2. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  3. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  4. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  5. 36 CFR 13.188 - Permit terms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit terms. 13.188 Section 13.188 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to...

  6. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  7. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process...

  8. 50 CFR 25.41 - Who issues refuge permits?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Who issues refuge permits? 25.41 Section... (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ADMINISTRATIVE PROVISIONS Permits § 25.41 Who issues refuge permits? We authorize the refuge manager of the facility where an activity is to take place to issue...

  9. California Tribal Gasoline Permits

    EPA Pesticide Factsheets

    EPA is proposing a draft general permit under the Clean Air Act Federal Indian Country Minor NSR program for gasoline dispensing facilities, such as gas stations, located in Indian country within the geographical boundaries of California.

  10. 76 FR 10246 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... regulations and update the standards for VA approval of such facilities, including standards for fire safety... to ``RIN 2900-AN57--Updating Fire Safety [[Page 10247

  11. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  12. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  13. 18 CFR 50.11 - General conditions applicable to permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...

  14. Retrievable payload carrier, next generation Long Duration Exposure Facility: Update 1992

    NASA Technical Reports Server (NTRS)

    Perry, A. T.; Cagle, J. A.; Newman, S. C.

    1993-01-01

    Access to space and cost have been two major inhibitors of low Earth orbit research. The Retrievable Payload Carrier (RPC) Program is a commercial space program which strives to overcome these two barriers to space experimentation. The RPC Program's fleet of spacecraft, ground communications station, payload processing facility, and experienced integration and operations team will provide a convenient 'one-stop shop' for investigators seeking to use the unique vantage point and environment of low Earth orbit for research. The RPC is a regularly launched and retrieved, free-flying spacecraft providing resources adequate to meet modest payload/experiment requirements, and presenting ample surface area, volume, mass, and growth capacity for investigator usage. Enhanced capabilities of ground communications, solar-array-supplied electrical power, central computing, and on-board data storage pick up on the path where NASA's Long Duration Exposure Facility (LDEF) blazed the original technology trail. Mission lengths of 6-18 months, or longer, are envisioned. The year 1992 was designated as the 'International Space Year' and coincides with the 500th anniversary of Christopher Columbus's voyage to the New World. This is a fitting year in which to launch the full scale development of our unique shop of discovery whose intent is to facilitate retrieving technological rewards from another new world: space. Presented is an update on progress made on the RPC Program's development since the November 1991 LDEF Materials Workshop.

  15. NPDES Permit Status Reports

    EPA Pesticide Factsheets

    These reports show the backlog status nationwide, based on EPA databases and input from EPA regions and states. The reports show a snapshot in time, keep in mind that the status of facilities and the universe of permits change.

  16. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF)more » and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.« less

  17. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... facilities authorized by Presidential Permit No. PP-22, as amended, include seven single conductor 132 kilovolt (kV) submarine cables and three single conductor 260 kV DC submarine cables. These cables do not...

  18. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less

  19. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  20. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  1. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  2. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  3. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  4. Notices of Intent for Coverage Under the NPDES General Permit for Oil and Gas Exploration Facilities on the Outer Continental Shelf in the Chukchi Sea

    EPA Pesticide Factsheets

    Notices of Intent (NOIs) submitted to EPA for coverage under the NPDES general permit for discharges from oil and gas exploration facilities on the outer continental shelf in the Chukchi Sea off Alaska.

  5. Recycled water reuse permit renewal application for the materials and fuels complex industrial waste ditch and industrial waste pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Name, No

    This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in themore » initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.« less

  6. Red Hill Updates

    EPA Pesticide Factsheets

    This and other periodic updates are intended to keep the public informed on major progress being made to protect public health and the environment at the Red Hill Underground Fuel Storage Facility in Hawaii.

  7. 77 FR 69769 - Solid Waste Rail Transfer Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    .... SUMMARY: These final rules govern land-use-exemption permits for solid waste rail transfer facilities. The... ``land-use-exemption permits'' in certain circumstances. Under the CRA, a solid waste rail transfer... grants a land-use-exemption permit for a solid waste rail transfer facility, such permit would only...

  8. 43 CFR 13.4 - Terms of permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  9. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  10. Infectious Diseases in Older Adults of Long-Term Care Facilities: Update on Approach to Diagnosis and Management.

    PubMed

    Jump, Robin L P; Crnich, Christopher J; Mody, Lona; Bradley, Suzanne F; Nicolle, Lindsay E; Yoshikawa, Thomas T

    2018-04-01

    The diagnosis, treatment, and prevention of infectious diseases in older adults in long-term care facilities (LTCFs), particularly nursing facilities, remains a challenge for all health providers who care for this population. This review provides updated information on the currently most important challenges of infectious diseases in LTCFs. With the increasing prescribing of antibiotics in older adults, particularly in LTCFs, the topic of antibiotic stewardship is presented in this review. Following this discussion, salient points on clinical relevance, clinical presentation, diagnostic approach, therapy, and prevention are discussed for skin and soft tissue infections, infectious diarrhea (Clostridium difficile and norovirus infections), bacterial pneumonia, and urinary tract infection, as well as some of the newer approaches to preventive interventions in the LTCF setting. © 2018, Copyright the Authors Journal compilation © 2018, The American Geriatrics Society.

  11. QA procedures and emissions from nonstandard sources in AQUIS, a PC-based emission inventory and air permit manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, A.E.; Tschanz, J.; Monarch, M.

    1996-05-01

    The Air Quality Utility Information System (AQUIS) is a database management system that operates under dBASE IV. It runs on an IBM-compatible personal computer (PC) with MS DOS 5.0 or later, 4 megabytes of memory, and 30 megabytes of disk space. AQUIS calculates emissions for both traditional and toxic pollutants and reports emissions in user-defined formats. The system was originally designed for use at 7 facilities of the Air Force Materiel Command, and now more than 50 facilities use it. Within the last two years, the system has been used in support of Title V permit applications at Department ofmore » Defense facilities. Growth in the user community, changes and additions to reference emission factor data, and changing regulatory requirements have demanded additions and enhancements to the system. These changes have ranged from adding or updating an emission factor to restructuring databases and adding new capabilities. Quality assurance (QA) procedures have been developed to ensure that emission calculations are correct even when databases are reconfigured and major changes in calculation procedures are implemented. This paper describes these QA and updating procedures. Some user facilities include light industrial operations associated with aircraft maintenance. These facilities have operations such as fiberglass and composite layup and plating operations for which standard emission factors are not available or are inadequate. In addition, generally applied procedures such as material balances may need special treatment to work in an automated environment, for example, in the use of oils and greases and when materials such as polyurethane paints react chemically during application. Some techniques used in these situations are highlighted here. To provide a framework for the main discussions, this paper begins with a description of AQUIS.« less

  12. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  13. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  14. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Application for permit. 13.2 Section 13.2 Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND... maintain vending facilities, including both vending stands and machines, to be operated by blind persons...

  15. The Updating of Geospatial Base Data

    NASA Astrophysics Data System (ADS)

    Alrajhi, Muhamad N.; Konecny, Gottfried

    2018-04-01

    Topopographic mapping issues concern the area coverage at different scales and their age. The age of the map is determined by the system of updating. The United Nations (UNGGIM) have attempted to track the global map coverage at various scale ranges, which has greatly improved in recent decades. However the poor state of updating of base maps is still a global problem. In Saudi Arabia large scale mapping is carried out for all urban, suburban and rural areas by aerial surveys. Updating is carried out by remapping every 5 to 10 years. Due to the rapid urban development this is not satisfactory, but faster update methods are forseen by use of high resolution satellite imagery and the improvement of object oriented geodatabase structures, which will permit to utilize various survey technologies to update the photogrammetry established geodatabases. The longterm goal is to create an geodata infrastructure, which exists in Great Britain or Germany.

  16. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  17. Topical otic drugs in a multi-purpose manufacturing facility: a guide on determination and application of permitted daily exposure (PDE).

    PubMed

    Wiesner, Lisa; Prause, Maarten; Lovsin Barle, Ester

    2018-03-01

    Due to newly introduced EU GMP (Good Manufacturing Practice) guideline for Medicinal Products for Human and Veterinary use, product specific permitted daily exposure (PDE) for toxicological evaluation in multi-purpose facilities are required within a documented process for risk assessment. European Medicines Agency (EMA) guidance on setting PDE limits so far focused on systemic administration routes such as intravenous (IV), oral or inhalation. This article provides guidance on setting PDE values for risk management purposes in multi-purpose facilities for active pharmaceutical ingredients (APIs) applied as topical otic drugs to the outer ear canal. The therewith determined PDE otic, is used for the calculation of maximum safe carry-over (MSC) in manufacturing scenarios where a topical otic product is manufactured followed by another topical otic product.

  18. RCRA, superfund and EPCRA hotline training module. Introduction to: Municipal solid waste disposal facility criteria updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module provides a summary of the regulatory criteria for municipal solid waste landfills (MSWLFs) and provides the statutory authority under RCRA and the Clean Water Act (CWA) directing EPA to develop the MSWLF criteria in 40 CFR Part 258. It gives the part 258 effective date and the compliance dates for providing demonstrations to satisfy individual regulatory requirements. It identifies the types of facilities that qualify for the small landfill exemption. It explains the requirements of each subpart of part 258 as they apply to states with EPA-approved MSWLF permit programs and states without approved permit programs. It comparesmore » the MSWLF environmental performance standards described in part 258 to the corresponding requirements for hazardous waste TSDFs in part 264, which are generally more stringent.« less

  19. Research Supports Value of Updated School Facilities

    ERIC Educational Resources Information Center

    Fielding, Randall

    2012-01-01

    Two recent peer-reviewed studies support the need to update the traditional school design model that has remained fundamentally unchanged for over a century. In a 2011 study published by the American Educational Research Journal, entitled "Problem-Based Learning in K-12 Education," Clarice Wirkala and Deanna Kuhn document a 200-500…

  20. EPA Facility Registry Service (FRS): PCS_NPDES

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Permit Compliance System (PCS) or the National Pollutant Discharge Elimination System (NPDES) module of the Integrated Compliance Information System (ICIS). PCS tracks NPDES surface water permits issued under the Clean Water Act. This system is being incrementally replaced by the NPDES module of ICIS. Under NPDES, all facilities that discharge pollutants from any point source into waters of the United States are required to obtain a permit. The permit will likely contain limits on what can be discharged, impose monitoring and reporting requirements, and include other provisions to ensure that the discharge does not adversely affect water quality. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NPDES facilities once the PCS or ICIS-NPDES data has been integrated into the FRS database. Additional information on FRS is available

  1. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  2. Region 9 NPDES Facilities - Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  3. 75 FR 27228 - Proposed FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice of proposed rulemaking. SUMMARY: Pursuant to 10 CFR 1703.107(b)(6) of the Board's regulations, the Defense Nuclear Facilities Safety Board is...

  4. 76 FR 28194 - Proposed FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 Proposed FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice of proposed rulemaking. SUMMARY: Pursuant to 10 CFR 1703.107(b)(6) of the Board's regulations, the Defense Nuclear Facilities Safety Board is...

  5. 75 FR 51968 - Outer Continental Shelf Air Regulations Consistency Update for Massachusetts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... comments to: Ida McDonnell, Air Permits, Toxics and Indoor Air Unit, Office of Ecosystem Protection, U.S... INFORMATION CONTACT: Ida E. McDonnell, Air Permits, Toxics and Indoor Air Unit, U.S. Environmental Protection... Continental Shelf Air Regulations Consistency Update for Massachusetts AGENCY: Environmental Protection Agency...

  6. Medicare Program; Inpatient Psychiatric Facilities Prospective Payment System--Update for Fiscal Year Beginning October 1, 2015 (FY 2016). Final rule.

    PubMed

    2015-08-05

    This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) (which are freestanding IPFs and psychiatric units of an acute care hospital or critical access hospital). These changes are applicable to IPF discharges occurring during fiscal year (FY) 2016 (October 1, 2015 through September 30, 2016). This final rule also implements: a new 2012-based IPF market basket; an updated IPF labor-related share; a transition to new Core Based Statistical Area (CBSA) designations in the FY 2016 IPF Prospective Payment System (PPS) wage index; a phase-out of the rural adjustment for IPF providers whose status changes from rural to urban as a result of the wage index CBSA changes; and new quality measures and reporting requirements under the IPF quality reporting program. This final rule also reminds IPFs of the October 1, 2015 implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), and updates providers on the status of IPF PPS refinements.

  7. 75 FR 17641 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... for VA approval of such facilities, including standards for fire safety and heating and cooling... submitted in response to ``RIN 2900-AN57--Updating Fire Safety Standards.'' Copies of comments received will...

  8. 50 CFR 622.240 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Golden Crab Fishery of..., respectively, must be issued to the dealer. (2) State license and facility requirements. To obtain a dealer permit, the applicant must have a valid state wholesaler's license in the state(s) where the dealer...

  9. Tennessee long-range transportation plan : aviation system plan update

    DOT National Transportation Integrated Search

    2005-01-01

    This plan update is streamlined in nature and will only consider the ttates six commercial service airports and 14 regional airports. The tasks completed for this update included an inventory of facilities, aviation industry review, review and upd...

  10. Region 9 NPDES Facilities 2012- Waste Water Treatment Plants

    EPA Pesticide Factsheets

    Point geospatial dataset representing locations of NPDES Waste Water Treatment Plant Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates direct discharges from facilities that discharge treated waste water into waters of the US. Facilities are issued NPDES permits regulating their discharge as required by the Clean Water Act. A facility may have one or more outfalls (dischargers). The location represents the facility or operating plant.

  11. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    EPA Pesticide Factsheets

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  12. NPDES Permit Walter Reed Army Medical Center

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000361, the Department of the Army is authorized to discharge from a facility located at Walter Reed Army Medical Center into receiving waters named Rock Creek.

  13. Permit Limit and Monitoring Requirements Report Help ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  14. Center Director's Update

    NASA Image and Video Library

    2016-03-01

    In the Space Shuttle Atlantis exhibit facility at the Kennedy Space Center's Visitor Complex, guests get a close-up look at a plant growth experiment similar to one aboard the International Space Station. This followed a presentation by center director Bob Cabana who updated community leaders on current and future activities at the space center.

  15. Enforcement and Compliance at Federal Facilities

    EPA Pesticide Factsheets

    Guide for complying with environmental laws and regulations at Federal Facilities This resource updates EPA's The Yellow Book: Guide to Environmental Enforcement and Compliance in Federal Facilities published in 1999.

  16. Medical Isotope Production Analyses In KIPT Neutron Source Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Talamo, Alberto; Gohar, Yousry

    Medical isotope production analyses in Kharkov Institute of Physics and Technology (KIPT) neutron source facility were performed to include the details of the irradiation cassette and the self-shielding effect. An updated detailed model of the facility was used for the analyses. The facility consists of an accelerator-driven system (ADS), which has a subcritical assembly using low-enriched uranium fuel elements with a beryllium-graphite reflector. The beryllium assemblies of the reflector have the same outer geometry as the fuel elements, which permits loading the subcritical assembly with different number of fuel elements without impacting the reflector performance. The subcritical assembly is drivenmore » by an external neutron source generated from the interaction of 100-kW electron beam with a tungsten target. The facility construction was completed at the end of 2015, and it is planned to start the operation during the year of 2016. It is the first ADS in the world, which has a coolant system for removing the generated fission power. Argonne National Laboratory has developed the design concept and performed extensive design analyses for the facility including its utilization for the production of different radioactive medical isotopes. 99Mo is the parent isotope of 99mTc, which is the most commonly used medical radioactive isotope. Detailed analyses were performed to define the optimal sample irradiation location and the generated activity, for several radioactive medical isotopes, as a function of the irradiation time.« less

  17. 30 CFR 778.9 - Certifying and updating existing permit application information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... you have previously applied for a permit and the required information is already in AVS, then you may... information already in AVS is accurate and complete may certify to us by swearing or affirming, under oath and in writing, that the relevant information in AVS is accurate, complete, and up to date. (2) Part of...

  18. Sources Approved for Coverage under the SQCS General Permit in Region 8

    EPA Pesticide Factsheets

    The sources on Indian country reservation lands that the Region 8 has approved for coverage under the General Air Quality Permit for New and Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country (SQCS General Permit).

  19. State Requirements for Educational Facilities, 1997.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This document updates Florida's deregulation of construction of educational facilities guidelines, while keeping as the primary focus the safety of the students in pre-K through community college facilities. Organized by the sequence of steps required in the facilities procurement process, it covers general definitions, property…

  20. Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF

    EPA Pesticide Factsheets

    Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.

  1. DSS command software update

    NASA Technical Reports Server (NTRS)

    Stinnett, W. G.

    1980-01-01

    The modifications, additions, and testing results for a version of the Deep Space Station command software, generated for support of the Voyager Saturn encounter, are discussed. The software update requirements included efforts to: (1) recode portions of the software to permit recovery of approximately 2000 words of memory; (2) correct five Voyager Ground data System liens; (3) provide capability to automatically turn off the command processor assembly local printer during periods of low activity; and (4) correct anomalies existing in the software.

  2. Aircraft Landing Dynamics Facility - A unique facility with new capabilities

    NASA Technical Reports Server (NTRS)

    Davis, P. A.; Stubbs, S. M.; Tanner, J. A.

    1985-01-01

    The Aircraft Landing Dynamics Facility (ALDF), formerly called the Landing Loads Track, is described. The paper gives a historical overview of the original NASA Langley Research Center Landing Loads Track and discusses the unique features of this national test facility. Comparisons are made between the original track characteristics and the new capabilities of the Aircraft Landing Dynamics Facility following the recently completed facility update. Details of the new propulsion and arresting gear systems are presented along with the novel features of the new high-speed carriage. The data acquisition system is described and the paper concludes with a review of future test programs.

  3. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  4. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  5. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  6. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  7. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  8. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  9. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  10. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  11. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  12. 33 CFR 126.33 - Penalties for handling dangerous cargo without permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Penalties for handling dangerous... HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.33 Penalties for handling dangerous cargo without permit. Handling, storing, stowing, loading...

  13. ICIS-NPDES Permit Limit and Discharge Monitoring Report ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  14. NPDES Permit for National World War II Memorial

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000345, the National World War II Memorial is authorized to discharge from a facility located at 17th St. and Independence Ave., S.W. Washington DC 20024.

  15. NPDES Permit for Wulf Cattle Depot in South Dakota

    EPA Pesticide Factsheets

    Under NPDES permit SD-0034606, the Wulf Cattle Depot is authorized to discharge and must operate their facility in accordance with effluent limitations, monitoring requirements, and other provisions set forth herein.

  16. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  17. Race, Wealth, and Solid Waste Facilities in North Carolina

    PubMed Central

    Norton, Jennifer M.; Wing, Steve; Lipscomb, Hester J.; Kaufman, Jay S.; Marshall, Stephen W.; Cravey, Altha J.

    2007-01-01

    Background Concern has been expressed in North Carolina that solid waste facilities may be disproportionately located in poor communities and in communities of color, that this represents an environmental injustice, and that solid waste facilities negatively impact the health of host communities. Objective Our goal in this study was to conduct a statewide analysis of the location of solid waste facilities in relation to community race and wealth. Methods We used census block groups to obtain racial and economic characteristics, and information on solid waste facilities was abstracted from solid waste facility permit records. We used logistic regression to compute prevalence odds ratios for 2003, and Cox regression to compute hazard ratios of facilities issued permits between 1990 and 2003. Results The adjusted prevalence odds of a solid waste facility was 2.8 times greater in block groups with ≥50% people of color compared with block groups with < 10% people of color, and 1.5 times greater in block groups with median house values < $60,000 compared with block groups with median house values ≥$100,000. Among block groups that did not have a previously permitted solid waste facility, the adjusted hazard of a new permitted facility was 2.7 times higher in block groups with ≥50% people of color compared with block groups with < 10% people of color. Conclusion Solid waste facilities present numerous public health concerns. In North Carolina solid waste facilities are disproportionately located in communities of color and low wealth. In the absence of action to promote environmental justice, the continued need for new facilities could exacerbate this environmental injustice. PMID:17805426

  18. 34 CFR 395.34 - Application for permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL...

  19. NPDES Permit for Shoshone Utility Organization in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0044580, the Shoshone Utility Organization is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to an unnamed irrigation drainage ditch tributary to the South Fork of the Little Wind R.

  20. NPDES Permit for Chemtrade Refinery Services in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0034207, Chemtrade Refinery Services, Inc. is authorized to discharge from its wastewater treatment facility located in Fremont County,Wyoming, to an unnamed drainage way that flows into the Little Wind River near St. Stephens, Wyo.

  1. Soil Sample Report in Support of the Site 300 EWTF Ecological Risk Assessment and Permit Renewal-September 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terusaki, Stanley; Gallegos, Gretchen; MacQueen, Donald

    2012-10-02

    LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potentialmore » interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.« less

  2. 34 CFR 395.34 - Application for permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Application for permits. 395.34 Section 395.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...

  3. 34 CFR 395.35 - Terms of permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Terms of permit. 395.35 Section 395.35 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VENDING FACILITY PROGRAM FOR THE BLIND ON FEDERAL AND OTHER...

  4. 40 CFR 144.36 - Duration of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Class II and III wells shall be issued for a period up to the operating life of the facility. The... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Duration of permits. 144.36 Section 144.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED...

  5. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  6. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  7. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  8. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  9. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  10. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental...

  11. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  12. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  13. NPDES Permit for Transit Waste's Bondad Landfill in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-R050005, Transit Waste, LLC is authorized to discharge from the Bondad Landfill facility in La Plata County, Colorado, to an unnamed tributary of the Animas River.

  14. NPDES Permit for Leadville National Fish Hatchery in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-0000582, the U.S. Department of the Interior, Fish and Wildlife Service is authorized to discharge from its Leadville National Fish Hatchery wastewater treatment facility in Colorado.

  15. 49 CFR 1155.26 - Transfer and termination of a land-use-exemption permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Transfer and termination of a land-use-exemption permit. 1155.26 Section 1155.26 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.26 Transfer and...

  16. NPDES Permit for General Services Administration (GSA) West Heating Plant

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000035, General Services Administration (GSA) West Heating Plant is authorized to discharge from a facility to receiving waters named Rock Creek.

  17. NPDES Permit for Crossfire-Bonds Gravel Pit in Colorado

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number CO-0035024, the Crossfire-Bonds Gravel Pit is authorized to discharge from its wastewater treatement facility in Plata County, Colorado, to Deer Canyon, a tributary of the Animas River.

  18. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  19. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  20. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  1. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  2. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  3. Reference manual for data base on Nevada water-rights permits

    USGS Publications Warehouse

    Cartier, K.D.; Bauer, E.M.; Farnham, J.L.

    1995-01-01

    The U.S. Geological Survey and Nevada Division of Water Resources have cooperatively developed and implemented a data-base system for managing water-rights permit information for the State of Nevada. The Water-Rights Permit data base is part of an integrated system of computer data bases using the Ingres Relational Data-Base Manage-ment System, which allows efficient storage and access to water information from the State Engineer's office. The data base contains a main table, three ancillary tables, and five lookup tables, as well as a menu-driven system for entering, updating, and reporting on the data. This reference guide outlines the general functions of the system and provides a brief description of data tables and data-entry screens.

  4. State Requirements for Educational Facilities, 1999.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.

    This updated, two-volume document provides guidance for those involved in the educational facilities procurement process, and includes recent legislative changes affecting the state of Florida's building code. The first volume is organized by the sequence of steps required in the facilities procurement process and presents state requirements for…

  5. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  6. NPDES Permit for Glendale Colony and Harvey Farms in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0031819, Glendale Colony, Inc., and Harvey Farms, Inc. are authorized to discharge and must operate their facilities in accordance with provisions set forth herein.Indian Country on the Blackfeet Reserva

  7. 40 CFR 124.10 - Public notice of permit actions and public comment period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... issued or is required to issue a RCRA, UIC, PSD (or other permit under the Clean Air Act), NPDES, 404... (CONTINUED) WATER PROGRAMS PROCEDURES FOR DECISIONMAKING General Program Requirements § 124.10 Public notice... Act for the same facility or activity (including EPA when the draft permit is prepared by the State...

  8. Commonwealth of Pennsylvania. [Establishment of hazardous waste facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Environmental Resources Secretary Arthur A. Davis and Commerce Secretary Raymond R. Christman have announced a joint initiative to establish commercial hazardous waste treatment and disposal facilities Pennsylvania. The state Hazardous Sites Cleanup Act, which Gov. Robert P. Casey signed into law last October, called for accelerated efforts in this regard. These included an expedited permitting process for facilities, requiring the Department of Environmental Resources (DER) to appoint a special sitting team to review permit applications, and designation of sitting coordinator within the Department of Commerce to identify potential developers of the facilities and encourage them to operate within Pennsylvania.

  9. NPDES Permit for Super Concrete Ready-Mix Corp. (Aggregate Industries)

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000175, Super Concrete Ready-Mix Corporation is authorized to discharge from a facility to receiving waters named unnamed tributary to Northwest Branch of the Anacostia River.

  10. RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Groundwater monitoring (40 CFR parts 264/265, subpart F) updated as of July 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities. It describes the groundwater monitoring criteria for interim status and permitted facilities. It explains monitoring well placement and outlines the three stages of the groundwater monitoring program for permitted facilities.

  11. Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torres, Juan; Anderson, Art

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less

  12. Petition Requesting the Administrator Object to Title V Permit for ABC Coke Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. NPDES Permit for Wesco Operating, Inc. – Maverick Springs in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000469, Wesco Operating, Inc. - Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  14. 78 FR 47859 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ...This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's ``60 percent rule'' compliance calculation to determine ``presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  15. NPDES Draft Permit for Spirit Lake Water Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit ND-0031101, Spirit Lake Water Resource Management is authorized to discharge to an unnamed intermittent tributary to Devils Lake which is tributary to Sheyenne River in North Dakota.

  16. NPDES Permit for Marathon Oil Company – Circle Ridge in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000949, the Marathon Oil Company – Circle Ridge is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Coal Draw.

  17. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  18. Proposed Reopening of NPDES Permit for NTUA Tuba City WWTF

    EPA Pesticide Factsheets

    EPA is issuing a notice of proposed action under the Clean Water Act to reopen a National Pollutant Discharge Elimination System (NPDES) permit NN0020290 issued to the Navajo Tribal Utility Authority (NTUA) Tuba City Wastewater Treatment Facility.

  19. Central Facilities Area Sewage Lagoon Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giesbrecht, Alan

    2015-03-01

    The Central Facilities Area (CFA) located in Butte County, Idaho at Idaho National Laboratory (INL) has an existing wastewater system to collect and treat sanitary wastewater and non contact cooling water from the facility. The existing treatment facility consists of three cells: Cell 1 has a surface area of 1.7 acres, Cell 2 has a surface area of 10.3 acres, and Cell 3 has a surface area of 0.5 acres. If flows exceed the evaporative capacity of the cells, wastewater is discharged to a 73.5 acre land application site that utilizes a center pivot irrigation sprinkler system. The purpose ofmore » this current study is to update the analysis and conclusions of the December 2013 study. In this current study, the new seepage rate and influent flow rate data have been used to update the calculations, model, and analysis.« less

  20. 78 FR 53493 - Presidential Permits: NOVA Chemicals Inc. Line 20 Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... natural gas liquids from the United States to Ontario, Canada. The Line 20 facilities were constructed in 1986 and operated most recently by another entity for the transport of natural gas pursuant to a..., for the export of natural gas liquids from the United States to Canada. The term ``facilities'' as...

  1. NPDES Permit for Potomac Electric Power Company (PEPCO) Benning Generating Station

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000094, the Potomac Electric Power Company (PEPCO) Benning Generating Station is authorized to discharge from from a facility to receiving waters named Anacostia River.

  2. NPDES Permit for Marathon Oil Company – Maverick Springs in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000779, the Marathon Oil Company – Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  3. NPDES Permit for Marathon Oil Company – Chatterton Battery in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000922, the Marathon Oil Company – Chatterton Battery is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  4. 41 CFR 102-74.280 - Are privately owned vehicles converted for propane carburetion permitted in underground parking...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are privately owned vehicles converted for propane carburetion permitted in underground parking facilities? 102-74.280 Section...

  5. Team Update on North American Proton Facilities for Radiation Testing

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Turflinger, Thomas; Haas, Thurman; George, Jeffrey; Moss, Steven; Davis, Scott; Kostic, Andrew; Wie, Brian; Reed, Robert; Guertin, Steven; hide

    2016-01-01

    In the wake of the closure of the Indiana University Cyclotron Facility (IUCF), this presentation provides an overview of the options for North American proton facilities. This includes those in use by the aerospace community as well as new additions from the cancer therapy regime. In addition, proton single event testing background is provided for understanding the criteria needed for these facilities for electronics testing.

  6. Centrifuge Facility for the International Space Station Alpha

    NASA Technical Reports Server (NTRS)

    Johnson, Catherine C.; Hargens, Alan R.

    1994-01-01

    The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from

  7. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  8. Detecting New Pedestrian Facilities from VGI Data Sources

    NASA Astrophysics Data System (ADS)

    Zhong, S.; Xie, Z.

    2017-12-01

    Pedestrian facility (e.g. footbridge, pedestrian crossing and underground passage) information is an important basic data of location based service (LBS) for pedestrians. However, timely updating pedestrian facility information challenges due to facilities change frequently. Previous pedestrian facility information collecting and updating tasks are mainly completed by highly trained specialized persons. However, this conventional approach has several disadvantages such as high cost, long update cycle and so on. Volunteered Geographic Information (VGI) has proven efficiency to provide new, free and fast growing spatial data. Pedestrian trajectory, which can be seen as measurements of real pedestrian road, is one of the most valuable information of VGI data. Although the accuracy of the trajectories is not too high, due to the large number of measurements, an improvement of quality of the road information can be achieved. Thus, we develop a method for detecting new pedestrian facilities based on the current road network and pedestrian trajectories. Specifically, 1) by analyzing speed, distance and direction, those outliers of pedestrian trajectories are removed, 2) a road network matching algorithm is developed for eliminating redundant trajectories, and 3) a space-time cluster algorithm is adopted for detecting new walking facilities. The performance of the method is evaluated with a series of experiments conducted on a part of the road network of Heifei and a large number of real pedestrian trajectories, and verified the results by using Tencent Street map. The results show that the proposed method is able to detecting new pedestrian facilities from VGI data accurately. We believe that the proposed method provides an alternative way for general road data acquisition, and can improve the quality of LBS for pedestrians.

  9. Animal research facility for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Bonting, Sjoerd L.

    1992-01-01

    An integrated animal research facility is planned by NASA for Space Station Freedom which will permit long-term, man-tended experiments on the effects of space conditions on vertebrates. The key element in this facility is a standard type animal habitat which supports and maintains the animals under full bioisolation during transport and during the experiment. A holding unit accommodates the habitats with animals to be maintained at zero gravity; and a centrifuge, those to be maintained at artificial gravity for control purposes or for gravity threshold studies. A glovebox permits handling of the animals for experimental purposes and for transfer to a clean habitat. These facilities are described, and the aspects of environmental control, monitoring, and bioisolation are discussed.

  10. Automation of electromagnetic compatability (EMC) test facilities

    NASA Technical Reports Server (NTRS)

    Harrison, C. A.

    1986-01-01

    Efforts to automate electromagnetic compatibility (EMC) test facilities at Marshall Space Flight Center are discussed. The present facility is used to accomplish a battery of nine standard tests (with limited variations) deigned to certify EMC of Shuttle payload equipment. Prior to this project, some EMC tests were partially automated, but others were performed manually. Software was developed to integrate all testing by means of a desk-top computer-controller. Near real-time data reduction and onboard graphics capabilities permit immediate assessment of test results. Provisions for disk storage of test data permit computer production of the test engineer's certification report. Software flexibility permits variation in the tests procedure, the ability to examine more closely those frequency bands which indicate compatibility problems, and the capability to incorporate additional test procedures.

  11. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2014. Final rule.

    PubMed

    2013-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's "60 percent rule'' compliance calculation to determine "presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  12. Should Advertising by Aesthetic Surgeons be Permitted?

    PubMed Central

    Nagpal, Neeraj

    2017-01-01

    Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations. PMID:28529421

  13. NPDES Permit for Fort Carson Landfill No. 5 in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034771, the United States Army, HQ, Fort Carson, is authorized to discharge groundwater seepage from the Landfill No. 5 facility at the Fort Carson Army Post in El Paso County, Colorado, to B Ditch, a tributary of Fountain Creek.

  14. 49 CFR 1155.20 - Notice of intent to apply for a land-use-exemption permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Notice of intent to apply for a land-use-exemption permit. 1155.20 Section 1155.20 Transportation Other Regulations Relating to Transportation (Continued... FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permit § 1155.20 Notice of intent to...

  15. 77 FR 32433 - Proposed FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ...Pursuant to 10 CFR 1703.107(b)(6) of the Board's regulations, the Defense Nuclear Facilities Safety Board is publishing its proposed Freedom of Information Act (FOIA) Fee Schedule Update and solicits comments from interested organizations and individual members of the public.

  16. NPDES Permit for NRG Energy (Formerly GenOn Potomac River Generating Station)

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0022004, NRG Energy (Formerly GenOn Potomac River Generating Station) is authorized to discharge from a facility into receiving waters named Potomac River.

  17. NPDES Permit for Arboles Sand & Stone's Lob Lolly Industrial Site in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0048194, Arboles Sand & Stone, LLC is authorized to discharge from its wastewater treatment facility at the Lob Lolly Industrial Site in Archuleta County, Colorado, to the Piedra River.

  18. RCRA Facility Information

    EPA Pesticide Factsheets

    This asset includes hazardous waste information, which is mostly contained in the Resource Conservation and Recovery Act Information (RCRAInfo) System, a national program management and inventory system addressing hazardous waste handlers. In general, all entities that generate, transport, treat, store, and dispose of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies pass on that information to regional and national EPA offices. This regulation is governed by the Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984. RCRAInfo Search can be used to determine identification and location data for specific hazardous waste handlers and to find a wide range of information on treatment, storage, and disposal facilities regarding permit/closure status, compliance with Federal and State regulations, and cleanup activities. Categories of information in this asset include:-- Handlers-- Permit Information-- GIS information on facility location-- Financial Assurance-- Corrective Action-- Compliance Monitoring and Enforcement (CM&E)

  19. Petition for the Administrator to Object to Title V Permit for Walter Coke Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. 78 FR 73582 - Presidential Permit for Kinder Morgan Cochin, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... conditions: Article 1. (1) The United States facilities herein described, and all aspects of their operation... Presidential Permit (the ``Application''). Article 2. The standards for, and the manner of, the operation and... their official duties. Article 3. The permittee shall comply with all applicable federal, state, and...

  1. 40 CFR 239.4 - Narrative description of state permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-hazardous waste disposal units that receive CESQG hazardous waste, January 1, 1998. (e) A discussion of... WASTES REQUIREMENTS FOR STATE PERMIT PROGRAM DETERMINATION OF ADEQUACY State Program Application § 239.4...; (d) The number of facilities within the state's jurisdiction that received waste on or after the...

  2. Fisher Sand & Gravel New Mexico, Inc. General Air Quality Permit: Related Documents

    EPA Pesticide Factsheets

    Documents related to the Fisher Sand & Gravel – New Mexico, Inc., Grey Mesa Gravel Pit General Air Quality Permit for New or Modified Minor Source Stone Quarrying, Crushing, and Screening Facilities in Indian Country.

  3. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... exempt from the requirements of this section. [48 FR 33820, July 25, 1983] Report of Major Electric...

  4. Systems test facilities existing capabilities compilation

    NASA Technical Reports Server (NTRS)

    Weaver, R.

    1981-01-01

    Systems test facilities (STFS) to test total photovoltaic systems and their interfaces are described. The systems development (SD) plan is compilation of existing and planned STFs, as well as subsystem and key component testing facilities. It is recommended that the existing capabilities compilation is annually updated to provide and assessment of the STF activity and to disseminate STF capabilities, status and availability to the photovoltaics program.

  5. 75 FR 11150 - Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23) filed an application for a preliminary permit... new 2.6-mile- long, 23-kilovolt transmission line; and (5) appurtenant facilities. The proposed...

  6. 78 FR 4162 - Endangered Species; Receipt of Applications for Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...: Greenville Zoo, Greenville, SC; PRT-92474A The applicant requests a captive-bred wildlife registration under.... Applicant: Honolulu Zoo, Honolulu, HI; PRT-94141A The applicant requests a permit authorizing interstate and... captive-bred facility in Honolulu, Hawaii to Africam Zoo in Puebla, Mexico for the purpose of enhancement...

  7. 49 CFR 655.73 - Access to facilities and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Access to facilities and records. 655.73 Section... OPERATIONS Administrative Requirements § 655.73 Access to facilities and records. (a) Except as required by... payment for the production of those records. (c) An employer shall permit access to all facilities...

  8. 47 CFR 73.1615 - Operation during modification of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operation during modification of facilities. 73... modification of facilities. When the licensee of an existing AM, FM, TV or Class A TV station is in the process of modifying existing facilities as authorized by a construction permit and determines it is...

  9. NPDES Permit for Devon Energy Production Company – Riverton Dome in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0000671, Devon Energy Production Company, L.P. – Riverton Dome is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to the Little Wind River via unnamed draw.

  10. 77 FR 76479 - Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9765-4] Clean Air Act Operating Permit Program: Order Responding to Petition for Objection to State Operating Permit for U.S. Steel-- Granite City Works, Granite... Protection Agency (IEPA) for the U.S. Steel--Granite City Works (USGW) facility, located in Granite City...

  11. NPDES Draft Permit for Standing Rock Rural Water System in South Dakota

    EPA Pesticide Factsheets

    Under NPDES draft permit SD-0030996, the Standing Rock Rural Water System is authorized to discharge from its wastewater treatment facility in Corson County, South Dakota, to an unnamed tributary to Oahe Reservoir on the Missouri River.

  12. 77 FR 4813 - Proposed Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... the conditions of the Beaufort general permit are stringent enough to comply with State water quality... conditions than what is proposed in the Beaufort general permit to ensure compliance with State water quality... Clean Water Act (CWA or ``the Act''), 33 U.S.C. 1342. State Certification of Beaufort General Permit...

  13. NPDES Permit for Thunder Butte Petroleum Services Inc. Refinery in North Dakota

    EPA Pesticide Factsheets

    Under NPDES permit ND-003098, the Thunder Butte Petroleum Services Inc. refinery is authorized to discharge from its wastewater treatment facilities near Makoti in Ward County, North Dakota, to wetlands tributary to the East Fork of Shell Creek.

  14. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 1. 205.328 Section 205.328 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...

  15. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2011-01-01 2011-01-01 false Environmental requirements for Presidential Permits-Alternative 2. 205.329 Section 205.329 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS...

  16. Facility Search Help | ECHO | US EPA

    EPA Pesticide Factsheets

    Search for compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  17. EPA Facility Registry Service (FRS): Facility Interests Dataset Download

    EPA Pesticide Factsheets

    This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers

  18. NPDES Permit for Phoenix Production Company – Rolff Lake Unit in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-002494, Phoenix Production Company is authorized to discharge from its Rolff Lake Unit wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.

  19. NPDES Permit for Phoenix Production Company – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0024953, Phoenix Production Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, which is tributary to the Wind River.

  20. NPDES Permit for Eastern Colorado Health Care System (VA Hospital) in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034991, the U.S. Department of Veterans Affairs (VA) is authorized to discharge from its wastewater treatment facility in Adams County, Colorado, to a storm sewer to Toll Gate Creek, a tributary of Sand Creek.

  1. NPDES Permit for \\tWashington Metropolitan Area Transit Authority (WMATA) Mississippi Avenue Pumping Station

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number DC0000337, the Washington Metropolitan Area Transit Authority (WMATA) is authorized to dischargefrom a facility to receiving waters named Oxon Run.

  2. AQUIS: A PC-based air inventory and permit manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, A.E.; Huber, C.C.; Tschanz, J.

    1992-01-01

    The Air Quality Utility Information System (AQUIS) was developed to calculate and track sources, emissions, stacks, permits, and related information. The system runs on IBM-compatible personal computers with dBASE IV and tracks more than 1,200 data items distributed among various source categories. AQUIS is currently operating at nine US Air Force facilities that have up to 1,000 sources. The system provides a flexible reporting capability that permits users who are unfamiliar with database structure to design and prepare reports containing user-specified information. In addition to six criteria pollutants, AQUIS calculates compound-specific emissions and allows users to enter their own emissionmore » estimates.« less

  3. NPDES Permit for Wesco Operating, Inc. – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0025607, Wesco Operating, Inc. is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Dry (Pasup) Creek, which is tributary to the Wind River.

  4. NPDES Permit for Wesco Operating, Inc. – Winkleman Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0025232, Wesco Operating, Inc. is authorized to discharge from its Winkleman Dome Field wastewater treatment facility in Fremont County, Wyo. to an unnamed ephemeral tributary of Big Horn Draw, a tributary to the Little Wind River.

  5. EPA Facility Registry Service (FRS): Facility Interests Dataset

    EPA Pesticide Factsheets

    This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz

  6. Deficient Permit Notification Notice For Lake County Waste to Energy Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. Digital representation of oil and natural gas well pad scars in southwest Wyoming: 2012 update

    USGS Publications Warehouse

    Garman, Steven L.; McBeth, Jamie L.

    2015-01-01

    The recent proliferation of oil and natural gas energy development in the Greater Green River Basin of southwest Wyoming has accentuated the need to understand wildlife responses to this development. The location and extent of surface disturbance that is created by oil and natural gas well pad scars are key pieces of information used to assess the effects of energy infrastructure on wildlife populations and habitat. A digital database of oil and natural gas pad scars had previously been generated from 1-meter (m) National Agriculture Imagery Program imagery (NAIP) acquired in 2009 for a 7.7-million hectare (ha) (19,026,700 acres) region of southwest Wyoming. Scars included the pad area where wellheads, pumps, and storage facilities reside and the surrounding area that was scraped and denuded of vegetation during the establishment of the pad. Scars containing tanks, compressors, the storage of oil and gas related equipment, and produced-water ponds were also collected on occasion. This report updates the digital database for the five counties of southwest Wyoming (Carbon, Lincoln, Sublette, Sweetwater, Uinta) within the Wyoming Landscape Conservation Initiative (WLCI) study area and for a limited portion of Fremont, Natrona, and Albany Counties using 2012 1-m NAIP imagery and 2012 oil and natural gas well permit information. This report adds pad scars created since 2009, and updates attributes of all pad scars using the 2012 well permit information. These attributes include the origination year of the pad scar, the number of active and inactive wells on or near each pad scar in 2012, and the overall status of the pad scar (active or inactive). The new 2012 database contains 17,404 pad scars of which 15,532 are attributed as oil and natural gas well pads. Digital data are stored as shapefiles projected to the Universal Transverse Mercator (zones 12 and 13) coordinate system. These data are available from the U.S. Geological Survey (USGS) at http://dx.doi.org/10

  8. 78 FR 70042 - Proposed Issuance of the NPDES General Permit for Oil and Gas Geotechnical Surveying and Related...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of the Beaufort... (NPDES) General Permit for Oil and Gas Geotechnical Surveying and Related Activities in Federal Waters of... authorizes twelve types of discharges from facilities engaged in oil and gas geotechnical surveys to evaluate...

  9. Neurobiology of emotions: an update.

    PubMed

    Esperidião-Antonio, Vanderson; Majeski-Colombo, Marilia; Toledo-Monteverde, Diana; Moraes-Martins, Glaciele; Fernandes, Juliana José; Bauchiglioni de Assis, Marjorie; Montenegro, Stefânia; Siqueira-Batista, Rodrigo

    2017-06-01

    The 'nature' of emotions is one of the archaic themes of Western thought, thematized in different cultural manifestations - such as art, science, philosophy, myths and religion -, since Ancient times. In the last decades, the advances in neurosciences have permitted the construction of hypotheses that explain emotions, especially through the studies involving the limbic system. To present an updated discussion about the neurobiology of processes relating to emotions - focusing (1) on the main neural structures that relate to emotions, (2) the paths and circuits of greater relevance, (3) the implicated neurotransmitters, (4) the connections that possess neurovegetative control and (5) the discussion about the main emotions - is the objective of this present article.

  10. Space Station Furnace Facility. Experiment/Facility Requirements Document (E/FRD), volume 2, appendix 5

    NASA Technical Reports Server (NTRS)

    Kephart, Nancy

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidifcation conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment, and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace.

  11. EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet Download

    EPA Pesticide Factsheets

    This downloadable data package consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers

  12. RCRA, superfund and EPCRA hotline training module. Introduction to: Groundwater monitoring (40 cfr parts 264/265, subpart f) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.

  13. Permit Fees

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  14. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  15. NPDES Draft Permit for City of New Town Water Treatment Plant in North Dakota

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System draft permit number ND0031151, The City of New Town Water Treatment Plant is authorized to discharge from its wastewater treatment facility in Mountrail County, North Dakota.

  16. National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W J; Moses, E; Warner, B

    2000-12-07

    The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  17. Facility Search Results | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  18. Facility Search - Water | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  19. Facility Search - Air | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  20. Detailed Facility Report | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  1. 2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael G. Lewis

    2012-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Areamore » Sewage Treatment plant.« less

  2. EPA Facility Registry Service (FRS): Facility Interests Dataset - Intranet

    EPA Pesticide Factsheets

    This web feature service consists of location and facility identification information from EPA's Facility Registry Service (FRS) for all sites that are available in the FRS individual feature layers. The layers comprise the FRS major program databases, including:Assessment Cleanup and Redevelopment Exchange System (ACRES) : brownfields sites ; Air Facility System (AFS) : stationary sources of air pollution ; Air Quality System (AQS) : ambient air pollution data from monitoring stations; Bureau of Indian Affairs (BIA) : schools data on Indian land; Base Realignment and Closure (BRAC) facilities; Clean Air Markets Division Business System (CAMDBS) : market-based air pollution control programs; Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) : hazardous waste sites; Integrated Compliance Information System (ICIS) : integrated enforcement and compliance information; National Compliance Database (NCDB) : Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Toxic Substances Control Act (TSCA); National Pollutant Discharge Elimination System (NPDES) module of ICIS : NPDES surface water permits; Radiation Information Database (RADINFO) : radiation and radioactivity facilities; RACT/BACT/LAER Clearinghouse (RBLC) : best available air pollution technology requirements; Resource Conservation and Recovery Act Information System (RCRAInfo) : tracks generators, transporters, treaters, storers, and disposers of haz

  3. 76 FR 77887 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Runway 4/22 extension, environmental assessment Runway 4/22 design--phase 3 Extend runway 4/22...: Snow removal equipment acquisition Airport pavement rehabilitation Master plan update Brief Description of Projects Approved For Collection: Design and permitting for runway 13/31 Easement acquisition...

  4. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... Protection Agency. ACTION: Notice of Final NPDES General Permit. SUMMARY: The Director of the Water Quality... Extraction Point Source Category as authorized by section 402 of the Clean Water Act, 33 U.S.C. 1342 (CWA... change to the proposed permit. A copy of the Region's responses to comments and the final permit may be...

  5. University of Maryland MRSEC - Facilities: SEM/STM/AFM

    Science.gov Websites

    MRSEC Templates Opportunities Search Home » Facilities » SEM/STM/AFM Shared Experimental Facilities conducting and non conducting samples. The sample stage permits electronic device imaging under operational Specifications: Image Modes - STM, STS, MFM, EFM, SKPM, contact- and non-contact AFM Three Sample Contacts 0.1 nm

  6. 77 FR 123 - Final Reissuance of General NPDES Permits (GP) for Facilities Related to Oil and Gas Extraction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  7. 78 FR 17661 - Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administrative Procedure Act (APA), or any other law, to publish general notice of proposed rulemaking.'' The RFA... NPDES general permits are permits, not rulemakings, under the APA and thus not subject to APA rulemaking...

  8. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  9. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  10. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  11. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  12. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  13. 7 CFR 1424.10 - Succession and control of facilities and production.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Succession and control of facilities and production... § 1424.10 Succession and control of facilities and production. A person who obtains a facility that is... grant such request if it is determined that permitting such succession would serve the purposes of the...

  14. Petition to Object to Title V Facility Permit Issued to Proposed Orange Recycling and Ethanol Production Facility in the City of Middletown, NY

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. Critical role for the mediodorsal thalamus in permitting rapid reward-guided updating in stochastic reward environments

    PubMed Central

    Chakraborty, Subhojit; Kolling, Nils; Walton, Mark E; Mitchell, Anna S

    2016-01-01

    Adaptive decision-making uses information gained when exploring alternative options to decide whether to update the current choice strategy. Magnocellular mediodorsal thalamus (MDmc) supports adaptive decision-making, but its causal contribution is not well understood. Monkeys with excitotoxic MDmc damage were tested on probabilistic three-choice decision-making tasks. They could learn and track the changing values in object-reward associations, but they were severely impaired at updating choices after reversals in reward contingencies or when there were multiple options associated with reward. These deficits were not caused by perseveration or insensitivity to negative feedback though. Instead, monkeys with MDmc lesions exhibited an inability to use reward to promote choice repetition after switching to an alternative option due to a diminished influence of recent past choices and the last outcome to guide future behavior. Together, these data suggest MDmc allows for the rapid discovery and persistence with rewarding options, particularly in uncertain or changing environments. DOI: http://dx.doi.org/10.7554/eLife.13588.001 PMID:27136677

  16. Oglethorpe Power Company, Wansley Energy Facility; Amended Order Denying Petition for Objection to Permit in Response to Remand

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  17. Introducing GEOPHIRES v2.0: Updated Geothermal Techno-Economic Simulation Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckers, Koenraad J; McCabe, Kevin

    This paper presents an updated version of the geothermal techno-economic simulation tool GEOPHIRES (GEOthermal energy for Production of Heat and electricity ('IR') Economically Simulated). GEOPHIRES combines engineering models of the reservoir, wellbores, and surface plant facilities of a geothermal plant with an economic model to estimate the capital and operation and maintenance costs, lifetime energy production, and overall levelized cost of energy. The available end-use options are electricity, direct-use heat, and cogeneration. The main updates in the new version include conversion of the source code from FORTRAN to Python, the option to import temperature data (e.g., measured or from stand-alonemore » reservoir simulator), updated cost correlations, and more flexibility in selecting the time step and number of injection and production wells. In this paper, we provide an overview of all the updates and two case studies to illustrate the tool's new capabilities.« less

  18. WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS

    EPA Science Inventory

    The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...

  19. 25 CFR 170.425 - How does BIA update the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA update the IRRTIP? 170.425 Section 170.425 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation...

  20. 25 CFR 170.444 - How is the IRR Inventory updated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is the IRR Inventory updated? 170.444 Section 170.444 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory...

  1. Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.

    PubMed

    Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M

    2018-03-06

    We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.

  2. NPDES Permit for Eagle Oil and Gas Company – Sheldon Dome Field in Wyoming

    EPA Pesticide Factsheets

    Under NPDES permit WY-0020338, the Eagle Oil and Gas Company is authorized to discharge from its Sheldon Dome Field wastewater treatment facility in Fremont County, Wyoming, to an unnamed ephemeral tributary of Dry Creek, a tributary to the Wind River.

  3. 77 FR 65547 - Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9747-5] Reissuance of the NPDES General Permits for Oil and... Sea and on the Outer Continental Shelf in the Chukchi Sea, AK AGENCY: Environmental Protection Agency... draft general permits were also published in the Anchorage Daily News, the Arctic Sounder, and Petroleum...

  4. Facility Search - Drinking Water | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  5. Facility Search - All Data | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  6. Facility Search - Hazardous Waste | ECHO | US EPA

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  7. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  8. 41 CFR 102-74.270 - Are vehicles required to display parking permits in parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vehicles required to... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.270 Are vehicles required...

  9. 21 CFR 1.241 - What are the consequences of failing to register, update, or cancel your registration?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false What are the consequences of failing to register, update, or cancel your registration? 1.241 Section 1.241 Food and Drugs FOOD AND DRUG ADMINISTRATION... Facilities Additional Provisions § 1.241 What are the consequences of failing to register, update, or cancel...

  10. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandoval, Leonard Frank

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamosmore » National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.« less

  11. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  12. 28 CFR 540.41 - Visiting facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Visiting facilities. 540.41 Section 540.41 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT CONTACT... visitors. (a) Institutions of minimum and low security levels may permit visits beyond the security...

  13. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  14. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  15. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  16. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  17. 38 CFR 21.344 - Facility offering training or rehabilitation services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Employment Under 38 U.S.C. Chapter 31 Leaves of Absence § 21.344 Facility offering training or rehabilitation services. (a) Approval of leaves of absence required. Leaves of absence normally must be approved... facility. (c) Conditions permitting approval of leaves of absence. (1) The case manager may approve leaves...

  18. Space exploration initiative candidate nuclear propulsion test facilities

    NASA Technical Reports Server (NTRS)

    Baldwin, Darrell; Clark, John S.

    1993-01-01

    One-page descriptions for approximately 200 existing government, university, and industry facilities which may be available in the future to support SEI nuclear propulsion technology development and test program requirements are provided. To facilitate use of the information, the candidate facilities are listed both by location (Index L) and by Facility Type (Index FT). The included one-page descriptions provide a brief narrative description of facility capability, suggest potential uses for each facility, and designate a point of contact for additional information that may be needed in the future. The Nuclear Propulsion Office at NASA Lewis presently plans to maintain, expand, and update this information periodically for use by NASA, DOE, and DOD personnel involved in planning various phases of the SEI Nuclear Propulsion Project.

  19. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Astrophysics Data System (ADS)

    1992-05-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  20. Experiment/facility requirements document for the Space Station Furnace Facility. Section 1: Integrated configuration

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The function of the Space Station Furnace Facility (SSFF) is to support materials research into the crystal growth and solidification processes of electronic and photonic materials, metals and alloys, and glasses and ceramics. To support this broad base of research requirements, the SSFF will employ a variety of furnace modules which will be operated, regulated, and supported by a core of common subsystems. Furnace modules may be reconfigured or specifically developed to provide unique solidification conditions for each set of experiments. The SSFF modular approach permits the addition of new or scaled-up furnace modules to support the evolution of the facility as new science requirements are identified. The SSFF Core is of modular design to permit augmentation for enhanced capabilities. The fully integrated configuration of the SSFF will consist of three racks with the capability of supporting up to two furnace modules per rack. The initial configuration of the SSFF will consist of two of the three racks and one furnace module. This Experiment/Facility Requirements Document (E/FRD) describes the integrated facility requirements for the Space Station Freedom (SSF) Integrated Configuration-1 (IC1) mission. The IC1 SSFF will consist of two racks: the Core Rack, with the centralized subsystem equipment; and the Experiment Rack-1, with Furnace Module-1 and the distributed subsystem equipment to support the furnace. The SSFF support functions are provided by the following Core subsystems: power conditioning and distribution subsystem (SSFF PCDS); data management subsystem (SSFF DMS); thermal control Subsystem (SSFF TCS); gas distribution subsystem (SSFF GDS); and mechanical structures subsystem (SSFF MSS).

  1. An Analytical Impact Assessment Framework for Wildlife to Inform the Siting and Permitting of Wind Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.

    In the United States overall electrical generation capacity is expected to increase by 10-25 gigawatts (GW) per year to meet increases in demand. Wind energy is a key component of state and federal renewable energy standards, and central to the Department of Energy’s 20% by 2030 wind production goals. Increased wind energy development may present increased resource conflict with avian wildlife, and environmental permitting has been identified as a potential obstacle to expansion in the sector. ICF developed an analytical framework to help applicants and agencies examine potential impacts in support of facility siting and permitting. A key objective ofmore » our work was to develop a framework that is scalable from the local to the national level, and one that is generalizable across the different scales at which biological communities operate – from local influences to meta-populations. The intent was to allow natural resource managers to estimate the cumulative impacts of turbine strikes and habitat changes on long-term population performance in the context of a species demography, genetic potential, and life history. We developed three types of models based on our literature review and participation in the scientific review processes. First, the conceptual model was developed as a general description of the analytical framework. Second, we developed the analytical framework based on the relationships between concepts, and the functions presented in the scientific literature. Third, we constructed an application of the model by parameterizing the framework using data from and relevant to the Altamont Pass Wind Resource Area (APWRA), and an existing golden eagle population model. We developed managed source code, database create statements, and written documentation to allow for the reproduction of each phase of the analysis. ICF identified a potential template adaptive management system in the form of the US Fish & Wildlife Service (USFWS) Adaptive Harvest

  2. Shingle Springs Band of Miwok Indians/Shingle Springs Rancheria: Express Fuel General Air Quality Permit Application

    EPA Pesticide Factsheets

    Shingle Springs Rancheria/Shingle Springs Band of Miwok Indians/Express Fuel Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Gasoline Dispensing Facilities in Indian Country within California.

  3. 75 FR 36117 - No Child Left Behind School Facilities and Construction Negotiated Rulemaking Committee-Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... visit; Brief update on school facilities FY11 budget; Review any language drafted by Committee members... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs No Child Left Behind School Facilities and... of Indian Affairs is announcing that the No Child Left Behind School Facilities and Construction...

  4. Robot Serviced Space Facility

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R. (Inventor)

    1992-01-01

    A robot serviced space facility includes multiple modules which are identical in physical structure, but selectively differing in function. and purpose. Each module includes multiple like attachment points which are identically placed on each module so as to permit interconnection with immediately adjacent modules. Connection is made through like outwardly extending flange assemblies having identical male and female configurations for interconnecting to and locking to a complementary side of another flange. Multiple rows of interconnected modules permit force, fluid, data and power transfer to be accomplished by redundant circuit paths. Redundant modules of critical subsystems are included. Redundancy of modules and of interconnections results in a space complex with any module being removable upon demand, either for module replacement or facility reconfiguration. without eliminating any vital functions of the complex. Module replacement and facility assembly or reconfiguration are accomplished by a computer controlled articulated walker type robotic manipulator arm assembly having two identical end-effectors in the form of male configurations which are identical to those on module flanges and which interconnect to female configurations on other flanges. The robotic arm assembly moves along a connected set or modules by successively disconnecting, moving and reconnecting alternate ends of itself to a succession of flanges in a walking type maneuver. To transport a module, the robot keeps the transported module attached to one of its end-effectors and uses another flange male configuration of the attached module as a substitute end-effector during walking.

  5. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  6. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  7. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  8. 30 CFR 903.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Article 1. (9) Fish and Wildlife Coordination Act, 16 U.S.C. 661-667. (10) Noise Control Act, 42 U.S.C...-256); (iv) Solid waste and air pollution discharge permits, installation and operation permits required for equipment causing air pollution and water pollution discharge permits (A.R.S. Title 49); (v...

  9. Approaches to Streamline Air Permitting for Combined Heat and Power: Permits by Rule and General Permits

    EPA Pesticide Factsheets

    This factsheet provides information about permit by rule (PBR) and general permit (GP) processes, including the factors that contributed to their development and lessons learned from their implementation.

  10. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  11. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  12. 7 CFR 4288.25 - Succession and control of facilities and production.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Succession and control of facilities and production... Repowering Assistance Payments to Eligible Biorefineries § 4288.25 Succession and control of facilities and... that, the party is eligible, and permitting such succession would serve the purposes of the program. If...

  13. Cold Vacuum Drying (CVD) Facility Acceptance for Beneficial Use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRISBIN, S.A.

    2000-01-05

    This document provides a checklist of the items required for turnover of the Cold Vacuum Drying Facility from the Construction Projects organization to the Operations organization. This document will be updated periodically to document completion of additional deliverables.

  14. Facility Search – Enforcement and Compliance Data | ECHO ...

    EPA Pesticide Factsheets

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  15. The National Ignition Facility Project: An Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hogan, W.J.; Moses, E.; Warner, B.

    2000-12-07

    The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less

  16. The Fair Facility

    NASA Astrophysics Data System (ADS)

    Nilsson, Thomas

    2015-03-01

    The FAIR (Facility for Antiproton and Ion Beams), under construction at the GSI site in Darmstadt, Germany, will be addressing a wealth of outstanding questions within the realm of subatomic, atomic and plasma physics through a combination of novel accelerators, storage rings and innovative experimental setups. The envisaged programme of FAIR yields a breadth that is unprecedented at an accelerator-based infrastructure. A brief review of the FAIR infrastructure and scientific reach is made, together with an update of the status of the construction.

  17. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and

  18. Airport Improvement Program : update of allocation of funds and passenger facility charges, 1992-1994

    DOT National Transportation Integrated Search

    1995-07-17

    This report updates the General Accounting Office's October 1993 report on the allocation of Airport Improvement Program (AIP) funds from 1982 through 1994 by the Federal Aviation Administration (FAA). Information is provided on FAA's allocation of A...

  19. A collision risk model to predict avian fatalities at wind facilities: an example using golden eagles, Aquila chrysaetos

    USGS Publications Warehouse

    New, Leslie; Bjerre, Emily; Millsap, Brian A.; Otto, Mark C.; Runge, Michael C.

    2015-01-01

    Wind power is a major candidate in the search for clean, renewable energy. Beyond the technical and economic challenges of wind energy development are environmental issues that may restrict its growth. Avian fatalities due to collisions with rotating turbine blades are a leading concern and there is considerable uncertainty surrounding avian collision risk at wind facilities. This uncertainty is not reflected in many models currently used to predict the avian fatalities that would result from proposed wind developments. We introduce a method to predict fatalities at wind facilities, based on pre-construction monitoring. Our method can directly incorporate uncertainty into the estimates of avian fatalities and can be updated if information on the true number of fatalities becomes available from post-construction carcass monitoring. Our model considers only three parameters: hazardous footprint, bird exposure to turbines and collision probability. By using a Bayesian analytical framework we account for uncertainties in these values, which are then reflected in our predictions and can be reduced through subsequent data collection. The simplicity of our approach makes it accessible to ecologists concerned with the impact of wind development, as well as to managers, policy makers and industry interested in its implementation in real-world decision contexts. We demonstrate the utility of our method by predicting golden eagle (Aquila chrysaetos) fatalities at a wind installation in the United States. Using pre-construction data, we predicted 7.48 eagle fatalities year-1 (95% CI: (1.1, 19.81)). The U.S. Fish and Wildlife Service uses the 80th quantile (11.0 eagle fatalities year-1) in their permitting process to ensure there is only a 20% chance a wind facility exceeds the authorized fatalities. Once data were available from two-years of post-construction monitoring, we updated the fatality estimate to 4.8 eagle fatalities year-1 (95% CI: (1.76, 9.4); 80th quantile, 6

  20. A Collision Risk Model to Predict Avian Fatalities at Wind Facilities: An Example Using Golden Eagles, Aquila chrysaetos

    PubMed Central

    New, Leslie; Bjerre, Emily; Millsap, Brian; Otto, Mark C.; Runge, Michael C.

    2015-01-01

    Wind power is a major candidate in the search for clean, renewable energy. Beyond the technical and economic challenges of wind energy development are environmental issues that may restrict its growth. Avian fatalities due to collisions with rotating turbine blades are a leading concern and there is considerable uncertainty surrounding avian collision risk at wind facilities. This uncertainty is not reflected in many models currently used to predict the avian fatalities that would result from proposed wind developments. We introduce a method to predict fatalities at wind facilities, based on pre-construction monitoring. Our method can directly incorporate uncertainty into the estimates of avian fatalities and can be updated if information on the true number of fatalities becomes available from post-construction carcass monitoring. Our model considers only three parameters: hazardous footprint, bird exposure to turbines and collision probability. By using a Bayesian analytical framework we account for uncertainties in these values, which are then reflected in our predictions and can be reduced through subsequent data collection. The simplicity of our approach makes it accessible to ecologists concerned with the impact of wind development, as well as to managers, policy makers and industry interested in its implementation in real-world decision contexts. We demonstrate the utility of our method by predicting golden eagle (Aquila chrysaetos) fatalities at a wind installation in the United States. Using pre-construction data, we predicted 7.48 eagle fatalities year-1 (95% CI: (1.1, 19.81)). The U.S. Fish and Wildlife Service uses the 80th quantile (11.0 eagle fatalities year-1) in their permitting process to ensure there is only a 20% chance a wind facility exceeds the authorized fatalities. Once data were available from two-years of post-construction monitoring, we updated the fatality estimate to 4.8 eagle fatalities year-1 (95% CI: (1.76, 9.4); 80th quantile, 6

  1. A Collision Risk Model to Predict Avian Fatalities at Wind Facilities: An Example Using Golden Eagles, Aquila chrysaetos.

    PubMed

    New, Leslie; Bjerre, Emily; Millsap, Brian; Otto, Mark C; Runge, Michael C

    2015-01-01

    Wind power is a major candidate in the search for clean, renewable energy. Beyond the technical and economic challenges of wind energy development are environmental issues that may restrict its growth. Avian fatalities due to collisions with rotating turbine blades are a leading concern and there is considerable uncertainty surrounding avian collision risk at wind facilities. This uncertainty is not reflected in many models currently used to predict the avian fatalities that would result from proposed wind developments. We introduce a method to predict fatalities at wind facilities, based on pre-construction monitoring. Our method can directly incorporate uncertainty into the estimates of avian fatalities and can be updated if information on the true number of fatalities becomes available from post-construction carcass monitoring. Our model considers only three parameters: hazardous footprint, bird exposure to turbines and collision probability. By using a Bayesian analytical framework we account for uncertainties in these values, which are then reflected in our predictions and can be reduced through subsequent data collection. The simplicity of our approach makes it accessible to ecologists concerned with the impact of wind development, as well as to managers, policy makers and industry interested in its implementation in real-world decision contexts. We demonstrate the utility of our method by predicting golden eagle (Aquila chrysaetos) fatalities at a wind installation in the United States. Using pre-construction data, we predicted 7.48 eagle fatalities year-1 (95% CI: (1.1, 19.81)). The U.S. Fish and Wildlife Service uses the 80th quantile (11.0 eagle fatalities year-1) in their permitting process to ensure there is only a 20% chance a wind facility exceeds the authorized fatalities. Once data were available from two-years of post-construction monitoring, we updated the fatality estimate to 4.8 eagle fatalities year-1 (95% CI: (1.76, 9.4); 80th quantile, 6

  2. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  3. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  4. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  5. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  6. 50 CFR 665.662 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any PRIA precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit... surrendering to the Regional Administrator any current permit for the precious coral fishery issued under § 665...

  7. 21 CFR 1.241 - What are the consequences of failing to register, update, or cancel your registration?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 1 2011-04-01 2011-04-01 false What are the consequences of failing to register... Facilities Additional Provisions § 1.241 What are the consequences of failing to register, update, or cancel... agent in charge of the facility fails to cancel the registration, or if FDA determines that the...

  8. 21 CFR 1.241 - What are the consequences of failing to register, update, or cancel your registration?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 1 2012-04-01 2012-04-01 false What are the consequences of failing to register... Facilities Additional Provisions § 1.241 What are the consequences of failing to register, update, or cancel... agent in charge of the facility fails to cancel the registration, or if FDA determines that the...

  9. 21 CFR 1.241 - What are the consequences of failing to register, update, or cancel your registration?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 1 2013-04-01 2013-04-01 false What are the consequences of failing to register... Facilities Additional Provisions § 1.241 What are the consequences of failing to register, update, or cancel... agent in charge of the facility fails to cancel the registration, or if FDA determines that the...

  10. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...

  11. 9 CFR 93.412 - Ruminant quarantine facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must be free of sharp edges that could cause injury to ruminants. (D) Ventilation and climate control...-changing area must be provided at each end of each shower area. There also must be one or more receptacles... updated with any changes or additions in advance of such person having access to the quarantine facility...

  12. 9 CFR 93.412 - Ruminant quarantine facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must be free of sharp edges that could cause injury to ruminants. (D) Ventilation and climate control...-changing area must be provided at each end of each shower area. There also must be one or more receptacles... updated with any changes or additions in advance of such person having access to the quarantine facility...

  13. 76 FR 3092 - Endangered Species Permit No. 1578-01 and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Species Permit No. 1578-01 and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... research permits (Permit Nos. 1578 and 1595- 03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  14. 75 FR 58350 - Endangered Species; Permit No. 1578-01; and Permit No. 1595-04

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... Species; Permit No. 1578-01; and Permit No. 1595-04 AGENCY: National Marine Fisheries Service (NMFS... modifications to permits (Permit Nos. 1578 and 1595-03) to take shortnose sturgeon for purposes of scientific... State House Station, Augusta, ME, 04333 (Permit No. 1578); and Michael M. Hastings, University of Maine...

  15. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations; (B) Discharge the same types of wastes or engage in the same types of sludge use or disposal... AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE... or subcategories of discharges or sludge use or disposal practices or facilities described in the...

  16. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...

  17. Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O, J.M.; Higgins, J.; Stephen Fleger - NRC

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.« less

  18. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  19. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  20. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  1. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  2. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  3. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  4. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  5. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  6. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  7. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  8. 50 CFR 665.162 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coral MUS in any American Samoa precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral... upon surrendering to the Regional Administrator any current permit for the precious coral fishery...

  9. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  10. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  11. 50 CFR 665.262 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Any vessel of the United States fishing for, taking, or retaining Hawaii precious coral MUS in any Hawaiian Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral Permit Areas...

  12. 50 CFR 665.462 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Permits. (a) Any vessel of the United States fishing for, taking, or retaining Mariana precious coral MUS in any Mariana Archipelago precious coral permit area must have a permit issued under § 665.13. (b) Each permit will be valid for fishing only in the permit area specified on the permit. Precious Coral...

  13. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2010; minimum data set, version 3.0 for skilled nursing facilities and Medicaid nursing facilities. Final rule.

    PubMed

    2009-08-11

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs), for fiscal year (FY) 2010. In addition, it recalibrates the case-mix indexes so that they more accurately reflect parity in expenditures related to the implementation of case-mix refinements in January 2006. It also discusses the results of our ongoing analysis of nursing home staff time measurement data collected in the Staff Time and Resource Intensity Verification project, as well as a new Resource Utilization Groups, version 4 case-mix classification model for FY 2011 that will use the updated Minimum Data Set 3.0 resident assessment for case-mix classification. In addition, this final rule discusses the public comments that we have received on these and other issues, including a possible requirement for the quarterly reporting of nursing home staffing data, as well as on applying the quality monitoring mechanism in place for all other SNF PPS facilities to rural swing-bed hospitals. Finally, this final rule revises the regulations to incorporate certain technical corrections.

  14. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ...-1231-9BPP] RIN 1018-AZ16 Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven... requirements of the Migratory Bird Permits Program and assigned OMB control number 1018- 0022, which expires... chapter I, title 50 of the Code of Federal Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1...

  15. Issuance of a final RCRA Part B Subpart X permit for open burning/open detonation (OB/OD) of explosives at Eglin AFB, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, G.E.; Culp, J.C.; Jenness, S.R.

    1997-12-31

    Treatment and disposal of explosives and munitions items have represented a significant management challenge for Department of Defense (DOD) facilities, particularly in light of increased regulatory scrutiny under the Federal Facilities Compliance Act provisions of the Resource Conservation and Recovery Act (RCRA). Subpart X of the RCRA regulations for storage, treatment, and disposal of hazardous wastes was drafted specifically to address explosive wastes. Until just recently, any DOD facility that was performing open burning/open detonation (OB/OD) of explosives was doing so under interim status for RCRA Part B Subpart X. In August 1996, Eglin Air Force Base (AFB), Florida becamemore » the first Air Force facility to be issued a final Part B Subpart X permit to perform OB/OD operations at two Eglin AFB active test ranges. This presentation will examine how Eglin AFB worked proactively with the State of Florida Department of Environmental Protection (FDEP) and EPA Region IV to develop permit conditions based upon risk assessment considerations for both air and ground-water exposure pathways. It will review the role of air emissions and air dispersion modeling in assessing potential exposure and impacts to both onsite and offsite receptors, and will discuss how air monitoring will be used to assure that the facility remains in compliance during OB/OD activities. The presentation will also discuss the soil and ground-water characterization program and associated risk assessment provisions for quarterly ground-water monitoring to assure permit compliance. The project is an excellent example of how a collaborative working relationship among the permittee, their consultant and state, and EPA can result in an environmentally protective permit that assures operational flexibility and mission sensitivity.« less

  16. Treatment of Osteoporosis in Australian Residential Aged Care Facilities: Update on Consensus Recommendations for Fracture Prevention

    PubMed Central

    Duque, Gustavo; Lord, Stephen R.; Mak, Jenson; Ganda, Kirtan; Close, Jacqueline J.T.; Ebeling, Peter; Papaioannou, Alexandra; Inderjeeth, Charles A.

    2016-01-01

    Background Older people living in residential aged care facilities (RACFs) are at a higher risk of suffering fractures than the community-dwelling older population. The first Consensus Conference on Treatment of Osteoporosis in RACFs in Australia, held in Sydney in July 2009, aimed to address some of the issues relating to the treatment of older residents with osteoporosis in RACFs. Considering that the field of osteoporosis diagnosis and management has significantly advanced in the last 5 years and that new evidence has been generated from studies performed within RACFs, a Second Consensus Conference was held in Sydney in November 2014. Methods An expert panel met in November 2014 in Penrith, NSW, Australia in an attempt to reach a consensus on diverse issues related to the treatment of osteoporosis at RACFs. Participants were selected by the scientific committee on the basis of their practice in an RACF and/or major published articles. The co-chairs distributed topics randomly to all participants, who then had to propose a statement on each topic for approval by the conference after a short, evidence-based presentation, when possible. Results This article provides an update on the most relevant evidence on osteoporosis in older people living in RACFs graded according to its level, quality, and relevance. Conclusion As with the first consensus, it is hoped that this statement will constitute an important guide to aid physicians in their decision making while practicing at RACFs. PMID:27349626

  17. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  18. 77 FR 69870 - Federal Housing Administration (FHA) Healthcare Facility Documents: Revisions and Updates and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... updating and revising a set of production, underwriting, asset management, closing, and other documents... clarify the requirements for a management agent and the management agreement. Production--Firm Commitments... closing documents to the Office of Management and Budget (OMB) for review and approval, and assignment of...

  19. 75 FR 23105 - Medicare Program; Inpatient Psychiatric Facilities Prospective Payment System Payment-Update for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Disorders Fourth Edition--Text Revision. DRGs Diagnosis-related groups. FY Federal fiscal year. ICD-9-CM...) coding and diagnosis-related groups (DRGs) classification changes discussed in the annual update to the... for the following patient-level characteristics: Medicare Severity diagnosis related groups (MS-DRGs...

  20. Instrument Systems Analysis and Verification Facility (ISAVF) users guide

    NASA Technical Reports Server (NTRS)

    Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.

    1985-01-01

    The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.

  1. 40 CFR 122.24 - Concentrated aquatic animal production facilities (applicable to State NPDES programs, see § 123...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...

  2. 40 CFR 122.24 - Concentrated aquatic animal production facilities (applicable to State NPDES programs, see § 123...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE... animal production facility means a hatchery, fish farm, or other facility which meets the criteria in... any warm or cold water aquatic animal production facility as a concentrated aquatic animal production...

  3. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  4. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  5. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  6. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  7. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  8. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  9. 30 CFR 947.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90... deny a permit application to the Washington Department of Natural Resources, the Department of Ecology...

  10. Guideline on terminology and definitions of updating clinical guidelines: The Updating Glossary.

    PubMed

    Martínez García, Laura; Pardo-Hernández, Hector; Sanabria, Andrea Juliana; Alonso-Coello, Pablo; Penman, Katrina; McFarlane, Emma

    2018-03-01

    The Guidelines International Network (G-I-N) Updating Guidelines Working Group launched an initiative to develop a glossary (the Updating Glossary) with domains, terms, definitions, and synonyms related to updating of clinical guidelines (CGs). The steering committee developed an initial list of domains, terms, definitions, and synonyms through brainstorming and discussion. The panel members participated in three rounds of feedback to discuss, refine, and clarify the proposed terms, definitions, and synonyms. Finally, the panel members were surveyed to assess their level of agreement regarding the glossary. Eighteen terms were identified and defined: (1) continuous updating, (2) decision to update, (3) fixed updating, (4) full updating, (5) impact of the new evidence, (6) partial updating, (7) prioritization process, (8) reporting process, (9) signal for an update, (10) surveillance process, (11) time of validity, (12) timeframe, (13) tools and resources, (14) up to date, (15) update cycle, (16) update unit, (17) updated version, and (18) updating strategy. Consensus was reached for all terms, definitions, and synonyms (median agreement scores ≥ 6); except for one term. The G-I-N Updating Guidelines Working Group assembled the Updating Glossary to facilitate and improve the knowledge exchange among CGs developers, researchers, and users. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  12. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  13. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  14. 50 CFR 622.50 - Permits, permit moratorium, and endorsements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Shrimp Fishery of the Gulf of Mexico § 622.50 Permits, permit moratorium, and... Fishery Management Plan for the Shrimp Fishery of the Gulf of Mexico (Gulf Shrimp FMP), all commercial...

  15. The Protein Crystallization Facility STS-95

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The Protein Crystallization Facility will be used to grow crystals of human insulin. Insulin is the primary treatment for diabetes, the fourth leading cause of death by disease. Research on STS-95 is aimed at producing crystals of even higher quality, which when combined with new analysis techniques will permit a better understanding of the interaction between insulin and its receptor. This has the potential to aid in the development of a new commercially available insulin product with unique time release properties that could reduce fluctuations in a patient's blood sugar level. The Protein Crystallization Facility supports large-scale commercial investigations.

  16. NPDES Permit Writers' Course

    EPA Pesticide Factsheets

    The objective of the NPDES permit writers' course is to provide the basic regulatory framework and technical considerations that support the development of wastewater discharge permits as required under the NPDES Permit Program.

  17. 2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2014-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plantmore » and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.« less

  18. NPDES Draft Permit for U.S. General Services Administration Downing Reservoir Groundwater Treatment Facility in Colorado

    EPA Pesticide Factsheets

    Under NPDES draft permit number CO-0035033, the U.S. General Services Administration is authorized to discharge from its Downing Reservoir Groundwater Treatment Plant to McIntyre Gulch entering Lakewood Gulch, tributary to the South Platte River.

  19. Naval electronic warfare simulation for effectiveness assessment and softkill programmability facility

    NASA Astrophysics Data System (ADS)

    Lançon, F.

    2011-06-01

    The Anti-ship Missile (ASM) threat to be faced by ships will become more diverse and difficult. Intelligence, rules of engagement constraints, fast reaction-time for effective softkill solution require specific tools to design Electronic Warfare (EW) systems and to integrate it onboard ship. SAGEM Company provides decoy launcher system [1] and its associated Naval Electronic Warfare Simulation tool (NEWS) to permit softkill effectiveness analysis for anti-ship missile defence. NEWS tool generates virtual environment for missile-ship engagement and counter-measure simulator over a wide spectrum: RF, IR, EO. It integrates EW Command & Control (EWC2) process which is implemented in decoy launcher system and performs Monte-Carlo batch processing to evaluate softkill effectiveness in different engagement situations. NEWS is designed to allow immediate EWC2 process integration from simulation to real decoy launcher system. By design, it allows the final operator to be able to program, test and integrate its own EWC2 module and EW library onboard, so intelligence of each user is protected and evolution of threat can be taken into account through EW library update. The objectives of NEWS tool are also to define a methodology for trial definition and trial data reduction. Growth potential would permit to design new concept for EWC2 programmability and real time effectiveness estimation in EW system. This tool can also be used for operator training purpose. This paper presents the architecture design, the softkill programmability facility concept and the flexibility for onboard integration on ship. The concept of this operationally focused simulation, which is to use only one tool for design, development, trial validation and operational use, will be demonstrated.

  20. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  1. Title V Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  2. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  3. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  4. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  5. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  6. 40 CFR 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... demonstrations using field test or laboratory analyses. 270.63 Section 270.63 Protection of Environment... using field test or laboratory analyses. (a) For the purpose of allowing an owner or operator to meet... the field test or laboratory analyses, or as a two-phase facility permit covering the field tests, or...

  7. Historical Permit Fee Rates

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements. Historical fee rates.

  8. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  9. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  10. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in Crustacean Permit Areas 1 or 2 must have a permit issued for that vessel. (4) Harvest of Hawaii crustacean MUS within the Northwestern Hawaiian Islands Marine National Monument is subject to the... limited access permit is valid for fishing only in Crustacean Permit Area 1. (2) Only one permit will be...

  11. 9 CFR 82.13 - Denial and withdrawal of permits and special permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PRODUCTS NEWCASTLE DISEASE AND CHLAMYDIOSIS Newcastle Disease § 82.13 Denial and withdrawal of permits and... prevent the dissemination of Newcastle disease, or, in the case of a special permit, that the special... threatens the public health, interest, or safety. The Administrator will send the person to whom the permit...

  12. 40 CFR 256.63 - Requirements for public participation in the permitting of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE... solid waste disposal facility the State shall hold a public hearing to solicit public reaction and...

  13. 2014 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Mike

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2013, through October 31, 2014. The report contains, as applicable, the following information; Site description; Facility and system description; Permit required monitoring data and loading rates; Status of compliance conditions and activities; and Discussion of the facility’s environmental impacts. The current permit expires on March 16, 2015. A permit renewal application was submitted to Idaho Department of Environmental Quality on September 15, 2014. Duringmore » the 2014 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. Seepage testing of the three lagoons was performed between August 26, 2014 and September 22, 2014. Seepage rates from Lagoons 1 and 2 were below the 0.25 inches/day requirement; however, Lagoon 3 was above the 0.25 inches/day. Lagoon 3 has been isolated and is being evaluated for future use or permanent removal from service.« less

  14. Wire Chambers and Cherenkov Detectors at Fermilab Test Beam Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tame Narvaez, Karla

    2017-01-01

    Fermilab Test Beam Facility (FTBF) is dedicated to helping scientists test their prototypes. For this, FTBF has instrumentation that is very useful for the users. However, before a user can test a detector, it is necessary to ensure the facility has the characteristics they need. During this summer, we studied beam properties by collecting Cherenkov and wire chamber data. Analyzed data will be used for updating the general information that FTBF posts on a web page.

  15. Nevada NPDES Permits

    EPA Pesticide Factsheets

    In Nevada, EPA’s Pacific Southwest (Region 9) issues all NPDES permits for any discharges on tribal lands. All other NPDES permits are issued by the Nevada Division of Environmental Protection (NDEP).

  16. 75 FR 17644 - Update to NFPA 101, Life Safety Code, for State Home Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 51 RIN 2900-AN59 Update to NFPA 101, Life Safety Code... certain provisions of the 2009 edition of the National Fire Protection Association's NFPA 101, Life Safety... standards regarding life safety and fire safety. DATES: Written comments must be received by VA on or before...

  17. Control System Upgrade for a Mass Property Measurement Facility

    NASA Technical Reports Server (NTRS)

    Chambers, William; Hinkle, R. Kenneth (Technical Monitor)

    2002-01-01

    The Mass Property Measurement Facility (MPMF) at the Goddard Space Flight Center has undergone modifications to ensure the safety of Flight Payloads and the measurement facility. The MPMF has been technically updated to improve reliability and increase the accuracy of the measurements. Modifications include the replacement of outdated electronics with a computer based software control system, the addition of a secondary gas supply in case of a catastrophic failure to the gas supply and a motor controlled emergency stopping feature instead of a hard stop.

  18. EPA Facility Registry Service (FRS): ICIS

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Integrated Compliance Information System (ICIS). When complete, ICIS will provide a database that will contain integrated enforcement and compliance information across most of EPA's programs. The vision for ICIS is to replace EPA's independent databases that contain enforcement data with a single repository for that information. Currently, ICIS contains all Federal Administrative and Judicial enforcement actions and a subset of the Permit Compliance System (PCS), which supports the National Pollutant Discharge Elimination System (NPDES). ICIS exchanges non-sensitive enforcement/compliance activities, non-sensitive formal enforcement actions and NPDES information with FRS. This web feature service contains the enforcement/compliance activities and formal enforcement action related facilities; the NPDES facilities are contained in the PCS_NPDES web feature service. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on f

  19. Global baby-friendly hospital initiative monitoring data: update and discussion.

    PubMed

    Labbok, Miriam H

    2012-08-01

    The World Health Organization (WHO)/UNICEF Baby-Friendly Hospital Initiative (BFHI) was developed to support the implementation of the Ten Steps for Successful Breastfeeding. The purpose of this study is to assess trends in the numbers facilities ever-designated "baby-friendly," to consider uptake of the new WHO/UNICEF BFHI materials, and to consider implications for future breastfeeding support. The national contacts from the 2006-2007 UNICEF BFHI update were recontacted, as were WHO and UNICEF officers worldwide, to ascertain the number of hospitals ever-designated "baby-friendly," presence of a government breastfeeding oversight committee, use of the new BFHI materials and, if yes, use of the new maternity or human immunodeficiency virus (HIV) materials. Seventy countries reporting in 2010-2011 and the updates from an additional 61 reporting in 2006-2007 (n=131, or 66% of the 198 countries) confirm that there are at least 21,328 ever-designated facilities. This is 27.5% of maternities worldwide: 8.5% of those in industrialized countries and 31% in less developed settings. In 2010, government committees were reported by 18 countries, and 34 reported using the new BFHI materials: 14 reported using the maternity care and 11 reported using the HIV materials. Rates of increase in the number of ever-certified "baby-friendly" hospitals vary by region and show some chronological correlation with trends in breastfeeding rates. Although it is not possible to attribute this increase to the BFHI alone, there is ongoing interest in Ten Steps implementation and in BFHI. The continued growth may reflect the dedication of ministries of health and national BFHI groups, as well as increasing recognition that the Ten Steps are effective quality improvement practices that increase breastfeeding and synergize with community interventions and other program efforts. With renewed interest in maternal/neonatal health, revitalization of support for Ten Steps and their effective

  20. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...

  1. NASA Glenn Propulsion Systems Lab (PSL) Icing Facility Update

    NASA Technical Reports Server (NTRS)

    Thomas, Queito P.

    2015-01-01

    The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, PSL is capable of simulation of in-flight icing events in a ground test facility. The system was designed to operate at altitudes from 4,000 ft. to 40,000 ft. at Mach numbers up to 0.8M and inlet total temperatures from -60F to +15F.

  2. RADIATION FACILITY FOR NUCLEAR REACTORS

    DOEpatents

    Currier, E.L. Jr.; Nicklas, J.H.

    1961-12-12

    A radiation facility is designed for irradiating samples in close proximity to the core of a nuclear reactor. The facility comprises essentially a tubular member extending through the biological shield of the reactor and containing a manipulatable rod having the sample carrier at its inner end, the carrier being longitudinally movable from a position in close proximity to the reactor core to a position between the inner and outer faces of the shield. Shield plugs are provided within the tubular member to prevent direct radiation from the core emanating therethrough. In this device, samples may be inserted or removed during normal operation of the reactor without exposing personnel to direct radiation from the reactor core. A storage chamber is also provided within the radiation facility to contain an irradiated sample during the period of time required to reduce the radioactivity enough to permit removal of the sample for external handling. (AEC)

  3. 40 CFR 122.45 - Calculating NPDES permit conditions (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... limitations, standards and prohibitions shall be established for each outfall or discharge point of the permitted facility, except as otherwise provided under § 122.44(k) (BMPs where limitations are infeasible) and paragraph (i) of this section (limitations on internal waste streams). (b) Production-based...

  4. Treatment of Osteoporosis in Australian Residential Aged Care Facilities: Update on Consensus Recommendations for Fracture Prevention.

    PubMed

    Duque, Gustavo; Lord, Stephen R; Mak, Jenson; Ganda, Kirtan; Close, Jacqueline J T; Ebeling, Peter; Papaioannou, Alexandra; Inderjeeth, Charles A

    2016-09-01

    Older people living in residential aged care facilities (RACFs) are at a higher risk of suffering fractures than the community-dwelling older population. The first Consensus Conference on Treatment of Osteoporosis in RACFs in Australia, held in Sydney in July 2009, aimed to address some of the issues relating to the treatment of older residents with osteoporosis in RACFs. Considering that the field of osteoporosis diagnosis and management has significantly advanced in the last 5 years and that new evidence has been generated from studies performed within RACFs, a Second Consensus Conference was held in Sydney in November 2014. An expert panel met in November 2014 in Penrith, NSW, Australia in an attempt to reach a consensus on diverse issues related to the treatment of osteoporosis at RACFs. Participants were selected by the scientific committee on the basis of their practice in an RACF and/or major published articles. The co-chairs distributed topics randomly to all participants, who then had to propose a statement on each topic for approval by the conference after a short, evidence-based presentation, when possible. This article provides an update on the most relevant evidence on osteoporosis in older people living in RACFs graded according to its level, quality, and relevance. As with the first consensus, it is hoped that this statement will constitute an important guide to aid physicians in their decision making while practicing at RACFs. Copyright © 2016 AMDA – The Society for Post-Acute and Long-Term Care Medicine. Published by Elsevier Inc. All rights reserved.

  5. Cleanups In My Community (CIMC) - Federal facilities that are also Superfund sites, National Layer

    EPA Pesticide Factsheets

    Federal facilities are properties owned by the federal government. This data layer provides access to Federal facilities that are Superfund sites as part of the CIMC web service. Data are collected using the Superfund Enterprise Management System (SEMS) and transferred to Envirofacts for access by the public. Data about Federal facility Superfund sites are located on their own EPA web pages, and CIMC links to those pages. Links to the relevant web pages for each site are provided within the attribute table. Federal facility sites can be either Superfund sites or RCRA Corrective Action sites, or they may have moved from one program to the other and back. In Cleanups in My Community, you can map or list any of these Federal Facility sites. This data layer shows only those facilities that are Superfund Sites. RCRA federal facility sites and other Superfund NPL sites are included in other data layers as part of this web service.Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned. The CIMC web service was initially published in 2013, but the data are updated on the 18th of each month. The full schedule for data updates in CIMC is located here:

  6. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  7. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  8. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  9. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  10. 15 CFR 971.412 - Changes in permits and permit terms, conditions, and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMMERCIAL RECOVERY PERMITS Issuance/Transfer: Terms, Conditions and Restrictions Issuance/transfer... restrictions. (a) During the duration of a commercial recovery permit, changes in the permit or its associated commercial recovery plan may be initiated by either the permittee or the Administrator. (b) A significant...

  11. Georgia Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  12. Alabama Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  13. Kentucky Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  14. Mississippi Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  15. Tennessee Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  16. Florida Proposed Title V Permits

    EPA Pesticide Factsheets

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  17. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular ormore » valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.« less

  18. 77 FR 72431 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... principle place of business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary... with regard to whether issuing a new Presidential Permit reflecting the corporate succession and...

  19. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary of Plains All... whether issuing a new Presidential Permit reflecting the corporate succession and authorizing Plains LPG...

  20. 50 CFR 665.801 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... qualifying for, or renewing, limited access permits. In making such decision, the Administrator will review... American Samoa longline limited access permit initial permit decision, the Regional Administrator will... Hawaii longline limited access permit if that vessel is used: (1) To fish for western Pacific pelagic MUS...

  1. Spent nuclear fuel project cold vacuum drying facility operations manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IRWIN, J.J.

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less

  2. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  3. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  4. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  5. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.25 Section 71.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Permits for Early Reductions Sources § 71.25 Permit content. (a) Standard permit requirements. Each permit issued under...

  6. PSD Applicability for a PSD-Avoidance Permit Action for Intermet Corporation's Archer Creek Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; Fleger, S.

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.« less

  8. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  9. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  10. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  11. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  12. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  13. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  14. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  15. 78 FR 72830 - Migratory Bird Permits; Delegating Falconry Permitting Authority to 17 States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...-0110; FF09M21200-134-FXMB1231099BPP0] RIN 1018-BA01 Migratory Bird Permits; Delegating Falconry... Migratory Bird Permits Program and assigned OMB control number 1018-0022, which expires February 28, 2014... Regulations, as follows: PART 21--MIGRATORY BIRD PERMITS 0 1. The authority citation for part 21 continues to...

  16. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2018. Final rule.

    PubMed

    2017-08-03

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).

  17. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Administrative record for draft permits....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions of a draft permit prepared by EPA under § 124.6 shall be based on the administrative record defined...

  18. 50 CFR 622.90 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Red Drum Fishery of the Gulf of Mexico § 622.90 Permits. (a) Dealer permits and conditions—(1) Permits. For a dealer to first receive Gulf red drum harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued...

  19. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  20. 50 CFR 665.242 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Applicability. (1) The owner of any vessel used to fish for lobster in Permit Area 1 must have a limited access permit issued for such vessel. (2) The owner of any vessel used to fish for lobster in Permit Area 2 must... ownership in the partnership or corporation. (d) Lobster Limited Access Permit Requirements. (1) A lobster...

  1. 32 CFR 643.123 - Reserve facilities-Local civic organizations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Reserve facilities-Local civic organizations. 643... (CONTINUED) REAL PROPERTY REAL ESTATE Additional Authority of Commanders § 643.123 Reserve facilities—Local... been constructed, local civic and similar nonprofit organizations may be permitted to use the armory...

  2. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  3. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  4. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  5. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  6. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Making the hazardous waste... 262.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED...

  7. Petition Requesting the Administrator Ojbect to the Title V Permit for the Ontario County Landfill Gas-to-Energy Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. January 21, 2004 Petition for the Administrator to Object to the Operating Permit for Midwest Generation's Waukegan, IL Facility

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  9. Petition to Object to the Proposed Operating Permit for Consolidated Environmental Management, Inc., Nucor Steel Facility in Romeville, Louisiana

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. Petition Requesting the Administrator Object to the Revised US Steel Granite City Facility, Granite City, Illinois, Title V permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Using Third Party Data to Update a Reference Dataset in a Quality Evaluation Service

    NASA Astrophysics Data System (ADS)

    Xavier, E. M. A.; Ariza-López, F. J.; Ureña-Cámara, M. A.

    2016-06-01

    Nowadays it is easy to find many data sources for various regions around the globe. In this 'data overload' scenario there are few, if any, information available about the quality of these data sources. In order to easily provide these data quality information we presented the architecture of a web service for the automation of quality control of spatial datasets running over a Web Processing Service (WPS). For quality procedures that require an external reference dataset, like positional accuracy or completeness, the architecture permits using a reference dataset. However, this reference dataset is not ageless, since it suffers the natural time degradation inherent to geospatial features. In order to mitigate this problem we propose the Time Degradation & Updating Module which intends to apply assessed data as a tool to maintain the reference database updated. The main idea is to utilize datasets sent to the quality evaluation service as a source of 'candidate data elements' for the updating of the reference database. After the evaluation, if some elements of a candidate dataset reach a determined quality level, they can be used as input data to improve the current reference database. In this work we present the first design of the Time Degradation & Updating Module. We believe that the outcomes can be applied in the search of a full-automatic on-line quality evaluation platform.

  12. Preliminary technical data summary No. 3 for the Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, L.F.

    1980-05-01

    This document presents an update on the best information presently available for the purpose of establishing the basis for the design of a Defense Waste Processing Facility. Objective of this project is to provide a facility to fix the radionuclides present in Savannah River Plant (SRP) high-level liquid waste in a high-integrity form (glass). Flowsheets and material balances reflect the alternate CAB case including the incorporation of low-level supernate in concrete. (DLC)

  13. Biosecurity and bird movement practices in upland game bird facilities in the United States.

    PubMed

    Slota, Katharine E; Hill, Ashley E; Keefe, Thomas J; Bowen, Richard A; Pabilonia, Kristy L

    2011-06-01

    Since 1996, the emergence of Asian-origin highly pathogenic avian influenza subtype H5N1 has spurred great concern for the global poultry industry. In the United States, there is concern over the potential of a foreign avian disease incursion into the country. Noncommercial poultry operations, such as upland game bird facilities in the United States, may serve as a potential source of avian disease introduction to other bird populations including the commercial poultry industry, backyard flocks, or wildlife. In order to evaluate how to prevent disease transmission from these facilities to other populations, we examined biosecurity practices and bird movement within the upland game bird industry in the United States. Persons that held a current permit to keep, breed, or release upland game birds were surveyed for information on biosecurity practices, flock and release environments, and bird movement parameters. Biosecurity practices vary greatly among permit holders. Many facilities allow for interaction between wild birds and pen-reared birds, and there is regular long-distance movement of live adult birds among facilities. Results suggest that upland game bird facilities should be targeted for biosecurity education and disease surveillance efforts.

  14. 76 FR 8728 - Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... on Bear Creek, near Concrete, Washington. The sole purpose of a preliminary permit, if issued, is to... includes the following existing facilities: (1) A 100-foot-long diversion structure with a 30-foot-long, 6-foot- high ungated overflow spillway section at an elevation of 987 feet msl; (2) a 400-foot-long, 36...

  15. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  16. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  17. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  18. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  19. 40 CFR 72.85 - Permit reopenings.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Permit Revisions § 72.85 Permit reopenings. (a) The permitting authority shall reopen an Acid Rain permit for cause whenever: (1) Any additional requirement under the Acid Rain Program becomes applicable... revoked to assure compliance with Acid Rain Program requirements. (b) In reopening an Acid Rain permit for...

  20. 9 CFR 104.2 - Permit authorized.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... permits for importing biological products. They shall be: (1) U.S. Veterinary Biological Product Permit for Research and Evaluation; (2) U.S. Veterinary Biological Product Permit for Distribution and Sale; or (3) U.S. Veterinary Biological Product Permit for Transit Shipment Only. (b) A permit shall not be...

  1. 9 CFR 104.2 - Permit authorized.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... permits for importing biological products. They shall be: (1) U.S. Veterinary Biological Product Permit for Research and Evaluation; (2) U.S. Veterinary Biological Product Permit for Distribution and Sale; or (3) U.S. Veterinary Biological Product Permit for Transit Shipment Only. (b) A permit shall not be...

  2. RCRA, superfund and EPCRA hotline training module. Introduction to: RCRA enforcement and compliance updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module describes enforcement procedures and cites the statutory authority and describes the two different types of enforcement (i.e., administrative and judicial). It explains when and how EPA can enforce the RCRA regulations in authorized states. It describes the enforcement mechanisms available to EPA. It states the differences between enforcement at interim status and permitted facilities. It describes enforcement at federal facilities and identifies relevant resource documents.

  3. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  4. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  5. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  6. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  7. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  8. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  9. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  10. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  11. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  12. 45 CFR 671.8 - Permit administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Permit administration. 671.8 Section 671.8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.8 Permit administration. (a) Issuance of permits. The Director may approve an application for a permit in whole or in part, and may...

  13. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  14. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  15. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  16. HFE Process Guidance and Standards for potential application to updating NRC guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed tomore » the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.« less

  17. 33 CFR 325.5 - Forms of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) DA permits under this regulation will be in the form of individual permits or general permits. The basic format shall be ENG Form 1721, DA Permit (Appendix A). (2) The general conditions included in ENG... be required. (2) Nationwide permits. Nationwide permits are a type of general permit and represent DA...

  18. Poster - Thur Eve - 07: CNSC Update: "What's New in Class II".

    PubMed

    Heimann, M

    2012-07-01

    The Accelerators and Class II Facilities Division (ACFD) of the Canadian Nuclear Safety Commission (CNSC), is responsible for the oversight of radiotherapy facilities containing Class II prescribed equipment in Canada. This poster will highlight a number of new initiatives that the CNSC has implemented recently that have an impact on radiotherapy facility licensees. The presentation will discuss the recent policy decision to regulate particle accelerators of above 1 MeV. Challenges and progress with respect to the implementation of the policy will be presented. Other initiatives which will be described include: • The new ACFD webspace on the CNSC website, with direct links to relevant information on licensing, compliance and Class II prescribed equipment • The improved structure of the Appendix of Licence Documents that is part of every Class II licence • Updated licence application guides • Changes to Annual Compliance reporting requirements and progress on the ACR-Online initiative • Changes to some regulatory expectations related to medical accelerator facilities • Consolidation of Class II facility licences The poster will also include other initiatives that may be of particular interest to COMP membership. © 2012 American Association of Physicists in Medicine.

  19. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...

  20. 40 CFR 124.203 - How may I switch from my individual RCRA permit to a standardized permit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false How may I switch from my individual RCRA permit to a standardized permit? 124.203 Section 124.203 Protection of Environment ENVIRONMENTAL... Permit Applying for A Standardized Permit § 124.203 How may I switch from my individual RCRA permit to a...